WorldWideScience

Sample records for current risk projections

  1. Current industrial practice of managing risks in product development project portfolios

    DEFF Research Database (Denmark)

    Weng, R.; Oehmen, Josef; Ben-Daya, M.

    2013-01-01

    Managing portfolios of development and engineering projects currently presents significant challenges to companies. This is even more the case in the management of portfolio risks, where both industry and academia currently lack a clear conceptual understanding of what portfolio risks are and what...

  2. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  3. General risks for tunnelling projects: An overview

    Science.gov (United States)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  4. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  5. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  6. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  7. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  8. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  9. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  10. Risk-informed ranking of engineering projects

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2011-01-01

    Refurbishment planning requires prudent investment decisions with respect to the various systems and components at the station. These decisions are influenced by many factors, including engineering, safety, regulatory, economic, and political constraints. From an engineering perspective, the concept of cost-benefit analysis is a common way to allocate capital among various projects. Naturally, the 'best' or optimal project should have the lowest cost and the highest benefit. In the context of risk-informed decision making (RIDM), a process that has been widely embraced by the global nuclear community, the costs and benefits must further be 'weighted' by probabilities to estimate the underlying risk associated with the various planning alternatives. The main purpose of this study is to illustrate how risk and reliability information can be integrated into the refurbishment planning process to facilitate more objective and transparent investment decisions. The methodology is based on the concept of generation risk assessment (GRA) which provides a systematic approach for balancing investment costs with the reduction in overall financial risk. In addition to reliability predictions, the model provides estimates for the level of risk reduction associated with each system/project and also the break-even point for investment. This information is vital for project ranking, and helps to address the key question of whether capital investment should be made in the most risk critical systems, or in systems that reduce the overall risk the most. The application of the proposed methodology requires only basic information regarding the current reliability of each engineering system, which should be readily available from plant records and routine condition assessments. Because the methodology can be readily implemented in a Microsoft Excel spreadsheet, all plausible (e.g., bounding) planning scenarios, with or without investment, can also be generated quickly and easily, while

  11. An Assessment of risk response strategies practiced in software projects

    Directory of Open Access Journals (Sweden)

    Vanita Bhoola

    2014-11-01

    Full Text Available Risk management and success in projects are highly intertwined – better approaches to project risk management tend to increase chances of project success in terms of achieving scope & quality, schedule and cost targets. The process of responding to risk factors during a project’s life cycle is a crucial aspect of risk management referred to as risk response strategies, in this paper. The current research explores the status of risk response strategies applied in the software development projects in India. India provides a young IT-savvy English-speaking population, which is also cost effective. Other than the workforce, the environment for implementation of software projects in India is different from the matured economies. Risk management process is a commonly discussed theme, though its implementation in practice has a huge scope for improvement in India. The paper talks about four fundamental treatments to risk response – Avoidance, Transference, Mitigation and Acceptance (ATMA. From a primary data of 302 project managers, the paper attempts to address the risk response factors that lead to successful achievement of project scope & quality, schedule and cost targets, by using a series of regressions followed with Seemingly Unrelated Regression Equations (SURE modelling. Mitigation emerged as the most significant risk response strategy to achieve project targets. Acceptance, transference, and avoidance of risk were mostly manifested in the forms of transparency in communication across stakeholders, careful study of the nature of risks and close coordination between project team, customers/end-users and top management.

  12. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  13. Managing the risks of a large-scale infrastructure project : The case of Spoorzone Delft

    NARCIS (Netherlands)

    Priemus, H.

    2012-01-01

    Risk management in large-scale infrastructure projects is attracting the attention of academics and practitioners alike. After a brief summary of the theoretical background, this paper describes how the risk analysis and risk management shaped up in a current large-scale infrastructure project in

  14. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  15. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  16. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  17. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  18. Comparison of additive (absolute) risk projection models and multiplicative (relative) risk projection models in estimating radiation-induced lifetime cancer risk

    International Nuclear Information System (INIS)

    Kai, Michiaki; Kusama, Tomoko

    1990-01-01

    Lifetime cancer risk estimates depend on risk projection models. While the increasing lengths of follow-up observation periods of atomic bomb survivors in Hiroshima and Nagasaki bring about changes in cancer risk estimates, the validity of the two risk projection models, the additive risk projection model (AR) and multiplicative risk projection model (MR), comes into question. This paper compares the lifetime risk or loss of life-expectancy between the two projection models on the basis of BEIR-III report or recently published RERF report. With Japanese cancer statistics the estimates of MR were greater than those of AR, but a reversal of these results was seen when the cancer hazard function for India was used. When we investigated the validity of the two projection models using epidemiological human data and animal data, the results suggested that MR was superior to AR with respect to temporal change, but there was little evidence to support its validity. (author)

  19. NASA Space Radiation Risk Project: Overview and Recent Results

    Science.gov (United States)

    Blattnig, Steve R.; Chappell, Lori J.; George, Kerry A.; Hada, Megumi; Hu, Shaowen; Kidane, Yared H.; Kim, Myung-Hee Y.; Kovyrshina, Tatiana; Norman, Ryan B.; Nounu, Hatem N.; hide

    2015-01-01

    The NASA Space Radiation Risk project is responsible for integrating new experimental and computational results into models to predict risk of cancer and acute radiation syndrome (ARS) for use in mission planning and systems design, as well as current space operations. The project has several parallel efforts focused on proving NASA's radiation risk projection capability in both the near and long term. This presentation will give an overview, with select results from these efforts including the following topics: verification, validation, and streamlining the transition of models to use in decision making; relative biological effectiveness and dose rate effect estimation using a combination of stochastic track structure simulations, DNA damage model calculations and experimental data; ARS model improvements; pathway analysis from gene expression data sets; solar particle event probabilistic exposure calculation including correlated uncertainties for use in design optimization.

  20. Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks

    Directory of Open Access Journals (Sweden)

    Foroogh Ghasemi

    2018-05-01

    Full Text Available An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and the achievement of those objectives. Moreover, project interdependencies and cause–effect relationships between risks create complexity for portfolio risk analysis. This paper presents a model using Bayesian network (BN methodology for modeling and analyzing portfolio risks. To develop this model, first, portfolio-level risks and risks caused by project interdependencies are identified. Then, based on their cause–effect relationships all portfolio risks are organized in a BN. Conditional probability distributions for this network are specified and the Bayesian networks method is used to estimate the probability of portfolio risk. This model was applied to a portfolio of a construction company located in Iran and proved effective in analyzing portfolio risk probability. Furthermore, the model provided valuable information for selecting a portfolio’s projects and making strategic decisions.

  1. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  2. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  3. The Strategic Risk Management at Different Stages of Innovation Project

    Directory of Open Access Journals (Sweden)

    Pysmak Viktoriia O.

    2017-03-01

    Full Text Available This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried out. The concept of «innovation project» has been considered, its features and characteristics have been allocated. The basic tools of the strategic management of enterprise in current conditions have been described. The basic principles of the strategic risk management of innovation activity have been formulated. A scheme with allocating the stages of innovation activity and the risks involved has been elaborated, taking into consideration the factors of occurrence of risks. The main groups of management strategies have been allocated. The tasks facing the managerial board in the process of the strategic risk management at every stage of the innovation project have been formulated.

  4. Risk assessment and management in IOR projects

    International Nuclear Information System (INIS)

    Goodyear, S.G.; Gregory, A.T.

    1994-01-01

    The application of IOR techniques is one of the investment opportunities open to Exploration and Production companies. A project will only go forward if the perceived balance between the rewards and the risks is acceptable. IOR projects may be ruled out because they are considered to involve significantly higher risks than conventional developments. Therefore, some means of evaluating the actual level of risk may be required if the full economic benefits from IOR techniques are to be realized. Risk assessment is a key element in safety cases, where a well-established methodology for quantifying risk exists. This paper discusses the extension of these methods to IOR project risk assessment. Combining reservoir and IOR technique uncertainties with their impact on project performance allows project risk to be better quantified. The results of the risk assessment are presented in terms of a risk-reward diagram that plots the probability surface for possible project outcomes as a function of NPV (reward) and exposure (risk)

  5. Understanding Pre-Quantitative Risk in Projects

    Science.gov (United States)

    Cooper, Lynne P.

    2011-01-01

    Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

  6. Identification of risk factors affecting construction of projects: The case of emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available Controlling project risks has become a daunting task in construction and this can be attributed to issues such as the nature of modern projects. The challenge is that risk appears unannounced at any project phase for various reasons and thereby affecting the performance and the success of unprepared projects. The current studies that explored risk matters include Pehlivan and Öztemir (2015, Katre, and Ghaitidak (2016 amongst others. However, there is absence of unanimity from these studies on risk factors in construction. Thus, this article was instigated in order to identify and classify risk factors that affect the chances of project success. The research methodology selected for this article comprised of peer-reviewed articles between the periods of 2007 to 2017. This approach involved a comprehensive scrutiny into scholarly articles to comprehend risks in construction projects. Following a conceptual analysis, eighty factors were identified and classified under the following; technical, construction, financial, socio-political, physical, organisational, and environmental and other risks. From these categories, political instability was, found to be the most influential risk factor in construction projects and this factor was classified within the socio-political category and this category has total of 11 factors. Finding suggests the need for further empirical study.

  7. Current Resource Imagery Projects

    Data.gov (United States)

    Farm Service Agency, Department of Agriculture — Map showing coverage of current Resource imagery projects. High resolution/large scale Resource imagery is typically acquired for the U.S. Forest Service and other...

  8. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  9. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  10. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  11. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  12. EC FP6 Siberia-focused Enviro-RISKS Project and its Outcomes

    Science.gov (United States)

    Baklanov, A. A.; Gordov, E. P.

    2009-04-01

    The FP6 Project "Man-induced Environmental Risks: Monitoring, Management and Remediation of Man-made Changes in Siberia" (Enviro-RISKS) strategic objective is to facilitate elaboration of solid scientific background and understanding of man-made associated environmental risks, their influence on all aspects of regional environment and optimal ways for it remediation by means of coordinated initiatives of a range of relevant RTD projects as well as to achieve their improved integration thus giving the projects additional synergy in current activities and potential for practical applications. List of Partners includes 3 leading European research organizations, 6 leading Russian research organizations (5 - located in Siberia) and 1 organization from Kazakhstan. Additionally several Russian and European research organizations joined to the Project as Associated Partners. Scientific background and foundation for the project performance is formed by a number of different levels RTD projects carried out by Partners and devoted to near all aspects of the theme. The set comprise coordinated/performed by partners EC funded thematic international projects, Russian national projects and other projects performed by NIS partners. Project outcomes include, in particular, development and support of the bilingual Enviro-RISKS web portal (http://risks.scert.ru/) as the major tool for disseminations of environmental information and project results; achieved level of development of Siberia Integrated Regional Study (SIRS, http://sirs.scert.ru/), which is the Siberia-focused NEESPI Environmental Mega-Project ongoing under the auspices of the Siberian Branch of the Russian Academy of Sciences. The main Project outcome are Memorandum on the state of the art of environmental RTD activity in Siberia and Recommendations on future environmental RTD activity in Siberia elaborated by four Working Experts Groups working in most important for Siberia Thematic Focuses. Three Thematic Focuses

  13. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project

    NARCIS (Netherlands)

    van Os, A.; van Berkel, F.J.F.W.; de Gilder, T.C.; van Dyck, C.; Groenewegen, P.

    2015-01-01

    This paper explores the role of social identity threat in risk discourse in an infrastructure project, and the consequences risk discourse has for cooperation between stakeholders. We show that risks posed a threat to the identity of the project team, resulting in a discourse focused on attributing

  14. Prototype Biology-Based Radiation Risk Module Project

    Science.gov (United States)

    Terrier, Douglas; Clayton, Ronald G.; Patel, Zarana; Hu, Shaowen; Huff, Janice

    2015-01-01

    Biological effects of space radiation and risk mitigation are strategic knowledge gaps for the Evolvable Mars Campaign. The current epidemiology-based NASA Space Cancer Risk (NSCR) model contains large uncertainties (HAT #6.5a) due to lack of information on the radiobiology of galactic cosmic rays (GCR) and lack of human data. The use of experimental models that most accurately replicate the response of human tissues is critical for precision in risk projections. Our proposed study will compare DNA damage, histological, and cell kinetic parameters after irradiation in normal 2D human cells versus 3D tissue models, and it will use a multi-scale computational model (CHASTE) to investigate various biological processes that may contribute to carcinogenesis, including radiation-induced cellular signaling pathways. This cross-disciplinary work, with biological validation of an evolvable mathematical computational model, will help reduce uncertainties within NSCR and aid risk mitigation for radiation-induced carcinogenesis.

  15. Bridging the Divide between Safety and Risk Management for your Project or Program

    Science.gov (United States)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  16. Ontological Analysis of the Project Risk Management Concept ‘Risk’

    Directory of Open Access Journals (Sweden)

    Uzulāns Juris

    2018-02-01

    Full Text Available The aim of the current research series is to examine the definitions of the concept ‘risk’ and analyze the concepts used in the definitions of ‘risk’ in the sources of these definitions in order to perform the ontological analysis of the concept of ‘risk’. Ontological and epistemological analysis of the concepts in the definition of the concept ‘risk’ was used to answer the question what ‘risk’ means in project management. This investigation represents a part of the research series where the ontological, epistemological and methodological analysis of project risk is performed with the aim to improve risk registers and risk management as a whole. In the previous studies the author analyzed the concept of ‘event’ that defines the content of the concept ‘risk’. The use of ‘event’ was analyzed in different sources to find out how the concept should be used. The ontological, epistemological and methodological analysis of the definitions of the concept ‘risk’ is the theoretical foundation for risk register creation because it is possible to create complete and understandable register for the participants of the project risk management process. The author believes that the conducted research helps establish confidence that ontological analysis is the method that together with the epistemological and methodological analysis provides opportunity to perform analysis of risk management sources aimed at improving risk management. The results of the study cannot be considered sufficient for deriving valid conclusions about project risk management and developing recommendations for improving risk management with regard to the content of the risk register. For valid conclusions and recommendations, a deeper research is needed which, first of all, would analyze a larger number of sources.

  17. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  18. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  19. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  20. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  1. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  2. Study on Risk Approaches in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  3. Streamlining project delivery through risk analysis.

    Science.gov (United States)

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  4. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  5. Risk Analysis and Forecast Service for Geomagnetically Induced Currents in Europe

    Science.gov (United States)

    Wik, Magnus; Pirjola, Risto; Viljanen, Ari; Lundstedt, Henrik

    Geomagnetically induced currents (GIC), occurring during magnetic storms, pose a widespread natural disaster risk to the reliable operation of electric power transmission grids, oil and gas pipelines, telecommunication cables and railway systems. The solar magnetic activity is the cause of GIC. Solar coronal holes can cause recurrent inter-vals of raised geomagnetic activity, and coronal mass ejections (CME) at the Sun, sometimes producing very high speed plasma clouds with enhanced magnetic fields and particle densities, can cause the strongest geomagnetic storms. When the solar wind interacts with the geomag-netic field, energy is transferred to the magnetosphere, driving strong currents in the ionosphere. When these currents change in time a geoelectric field is induced at the surface of the Earth and in the ground. Finally, this field drives GIC in the ground and in any technological conductor systems. The worst consequence of a severe magnetic storm within a power grid is a complete blackout, as happened in the province of Québec, Canada, in March 1989, and in the city of Malmü, Sweden, in October 2003. Gas and oil pipelines are not regarded as vulnerable to the immediate impact of GIC, but the corrosion rate of buried steel pipes can increase due to GIC, which may thus shorten the lifetime of a pipe. European Risk from Geomagnetically Induced Currents (EURISGIC) is an EU project, that, if approved, will produce the first European-wide real-time prototype forecast service of GIC in power systems, based on in-situ solar wind observations and comprehensive simulations of the Earth's magnetosphere. This project focuses on high-voltage power transmission networks, which are probably currently the most susceptible to GIC effects. Geomagnetic storms cover large geographical regions, at times the whole globe. Consequently, power networks are rightly described as being European critical infrastructures whose disruption or destruction could have a significant impact

  6. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  7. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, Johannes I.M.; Keizer, J.A.

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  8. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1994-01-01

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  9. Default risk in project finance

    NARCIS (Netherlands)

    Klompjan, R.; Wouters, Marc

    2002-01-01

    Understanding default risk in project finance is relevant to investors. This article investigates which factors are most strongly associated with the occurrence of project finance default, using data from 210 projects, of which 37 were in default. The authors found that the use of proven technology,

  10. Consideration of Risk in PPP-Projects

    Directory of Open Access Journals (Sweden)

    Josef Zimmermann

    2014-06-01

    Full Text Available Risk management has become a core competence for companies operating in construction services. In particular regarding Real Estate Development and Construction Management the fundamental knowledge and the dedicated ap- plication of risk assessment turn out to be critical. Construction Management deals with a multitude of local and temporal issues which are unknown or only given by statistical evaluation while conducting a unique construction project within a very tight frame of budget and time. Real Estate projects focus on the predictability of profitable operation for a fairly long period in advance and are therefore subject to many more and more voluminous uncertainties. With PPP-projects a more or less complete federal task is awarded to a private company. Its extent varies but com- prises at least design, construction and operation of a real estate project, e.g. a toll road, bridge, tunnel or other infrastructural object. Durations of such contracts of- ten extend to some 20 to 30 years. In this article the applicability of traditional means of risk management is inves- tigated for the use on PPP-projects and limits of risk consequences are pointed out. Finally we come to the conclusion, that the resulting unavertable risks tend to exceed every surcharge that could be successfully placed on a market.

  11. RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Buck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic, M.

    2004-01-01

    In the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: - development (RTD); - demonstration (DEMO): - thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: - identification of critical components; - application of a multilevel risk analysis (...from 'screening' to 'detailed analysis'); - determination of PoF (Probability of Failure); - determination of CoF (Consequence of Failure); - optimation of inspection and maintenance plan. From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only 1 for the detailed analysis (probabilistic high temperature fracture mechanics)

  12. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  13. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  14. Risk managements' communicative effects influencing IT project success

    NARCIS (Netherlands)

    de Bakker, Karel; Boonstra, Albert; Wortmann, Hans

    The central question of this research is if, and how, risk management contributes to the success of IS/IT projects. Risk management is used regularly in IT projects, despite indications in literature that risk management only occasionally contributes to IT project success. Drawing on Habermas we

  15. Dealing with project complexity by matrix-based propagation modelling for project risk analysis

    OpenAIRE

    Fang , Chao; Marle , Franck

    2012-01-01

    International audience; Engineering projects are facing a growing complexity and are thus exposed to numerous and interdependent risks. In this paper, we present a quantitative method for modelling propagation behaviour in the project risk network. The construction of the network requires the involvement of the project manager and related experts using the Design Structure Matrix (DSM) method. A matrix-based risk propagation model is introduced to calculate risk propagation and thus to re-eva...

  16. Risk Identification and Assessment in PPP Infrastructure Projects using Fuzzy Analytical Hierarchy Process and Life-Cycle Methodology

    Directory of Open Access Journals (Sweden)

    Jie Li

    2012-11-01

    Full Text Available To fulfil the increasing demands of the public,Public Private Partnership (PPP has beenincreasingly used to procure infrastructureprojects, such as motor ways, bridges, tunnelsand railways. However, the risks involved inPPP projects are unique and dynamic due tolarge amount of investment and longconcession period. This paper aims to developa risk identification framework from theperspectives of project life cycle, and anassessment framework for risks associatedwith PPP project using fuzzy analyticalhierarchy process (AHP. First the paperreviews the current literature to identifycommon risks in PPP infrastructure projectsand classification methods used. The risksidentified from the literature were classifiedusing project life cycle perspectives. Followingthat, the paper presents the advantages offuzzy AHP. Furthermore, the paper provides aframework for assessment of risks in PPPprojects followed by an illustrative examplewhere the data was obtained from surveyquestionnaires. The paper concludes that risksassociated in PPP infrastructure projects areunique and therefore it is beneficial to classifythem from project life cycle perspectives, andthe proposed fuzzy AHP method is suitable forthe assessment of these risks.

  17. Current Research Status of KHNP for Site Risk

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Kyemin; Jeon, Ho-Jun; Bahng, Ki-In; Na, Jang-Hwan [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    In Korea, by the geographical characteristics, many Nuclear Power Plants (NPPs) have been constructed and operated at a single site. This is above average level or number of plants per site in the world. For this reason, the public concerns for the safety of nuclear facilities increased after Fukushima Daiichi accident. As a result, comprehensive risk assessment and management for the site which have multi-unit NPPs were strongly asked. Currently, to solve it, many researches and projects has carried out by various Korean companies, research centers, and regulatory authorities. In this paper, R and D plans of KHNP for multi-unit risk were summarized. Firstly, the needs of multi-unit PSA were reviewed. R and D activities and plans of KHNP were summarized in the last part. In this paper, we summarized the R and D plans of KHNP for assessing the multi-unit risk. Currently, multi-unit risk or multi-unit PSA are important and practical issues in both nuclear industry and national energy policy. After Fukushima accident, several countries stopped the construction and the operation of NPPs, other countries which is maintaining the NPPs are being strongly asked to assess the risk for multi-unit NPPs at the same site. Because of Korean geographical characteristics, the number of NPPs which are above average level or number of plants per site in the world is being constructed and operated at a single site. The population density nearby each site is considered to be higher than that of other countries.

  18. Current Research Status of KHNP for Site Risk

    International Nuclear Information System (INIS)

    Oh, Kyemin; Jeon, Ho-Jun; Bahng, Ki-In; Na, Jang-Hwan

    2016-01-01

    In Korea, by the geographical characteristics, many Nuclear Power Plants (NPPs) have been constructed and operated at a single site. This is above average level or number of plants per site in the world. For this reason, the public concerns for the safety of nuclear facilities increased after Fukushima Daiichi accident. As a result, comprehensive risk assessment and management for the site which have multi-unit NPPs were strongly asked. Currently, to solve it, many researches and projects has carried out by various Korean companies, research centers, and regulatory authorities. In this paper, R and D plans of KHNP for multi-unit risk were summarized. Firstly, the needs of multi-unit PSA were reviewed. R and D activities and plans of KHNP were summarized in the last part. In this paper, we summarized the R and D plans of KHNP for assessing the multi-unit risk. Currently, multi-unit risk or multi-unit PSA are important and practical issues in both nuclear industry and national energy policy. After Fukushima accident, several countries stopped the construction and the operation of NPPs, other countries which is maintaining the NPPs are being strongly asked to assess the risk for multi-unit NPPs at the same site. Because of Korean geographical characteristics, the number of NPPs which are above average level or number of plants per site in the world is being constructed and operated at a single site. The population density nearby each site is considered to be higher than that of other countries

  19. Projected Impact of Compositional Verification on Current and Future Aviation Safety Risk

    Science.gov (United States)

    Reveley, Mary S.; Withrow, Colleen A.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    The projected impact of compositional verification research conducted by the National Aeronautic and Space Administration System-Wide Safety and Assurance Technologies on aviation safety risk was assessed. Software and compositional verification was described. Traditional verification techniques have two major problems: testing at the prototype stage where error discovery can be quite costly and the inability to test for all potential interactions leaving some errors undetected until used by the end user. Increasingly complex and nondeterministic aviation systems are becoming too large for these tools to check and verify. Compositional verification is a "divide and conquer" solution to addressing increasingly larger and more complex systems. A review of compositional verification research being conducted by academia, industry, and Government agencies is provided. Forty-four aviation safety risks in the Biennial NextGen Safety Issues Survey were identified that could be impacted by compositional verification and grouped into five categories: automation design; system complexity; software, flight control, or equipment failure or malfunction; new technology or operations; and verification and validation. One capability, 1 research action, 5 operational improvements, and 13 enablers within the Federal Aviation Administration Joint Planning and Development Office Integrated Work Plan that could be addressed by compositional verification were identified.

  20. Project finance risks - getting it right first time

    International Nuclear Information System (INIS)

    Bain, F.

    1996-01-01

    Bankers seeking to invest in the construction of new power stations by independent power producers, face greater risks than those lending to companies. Independent risk and insurance advisers are used to assess project risk. ''Project finance'' has become increasingly popular as it allows projects to go ahead that could not be supported from sponsors' own resources. In addition, project finance means that various equity partners can join together in a joint venture company and limit their individual risk. Project finance can be delayed by differences between the needs of sponsors, financiers and insurers. The process can be speeded up by foreknowledge of bankers' requirements. (UK)

  1. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  2. Financing offshore projects: The banker's approach to risk

    International Nuclear Information System (INIS)

    Beldam, R.A.

    1994-01-01

    The author has attempted to consider why companies chose to share risks with banks and looked in particular at the unique risk sharing aspect of project financing and how this may be reflected in the loan documentation. He also has considered the current market place and examined some trends for the future. The future challenge in the North Sea is going to be to use existing and new technology to reduce capital and operating costs, balanced with optimal recovery and safety. From a bank perspective, this type of work is extremely satisfying, if challenging, and the author has no doubt banks will continue to play their part in the future of offshore development wherever it occurs around the world

  3. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  4. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  5. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  6. Risk analysis for construction and operation of gas pipeline projects in pakistan

    International Nuclear Information System (INIS)

    Mubin, S.; Mubin, G.

    2008-01-01

    In order to cater for its high energy demand, Pakistan is planning to import natural gas through pipelines from neighboring countries. For fully utilizing the imported gas, providing it to end customers, the infrastructure of gas pipeline needs to be developed. Therefore, huge investment has been done and proposed in this sector in coming future. Considering geological, topographical, geopolitical and climatic conditions of the country, there is added risk of earthquake, landslides and floods. Due to current geopolitical situation there is a persistent threat of unrest and terrorism in the country. Instable Government policies, high rate of inflation, rapid change in material prices are also important risk factors. All these factors make the situation very complex in quantifying the risk especially for a project in which the risk impact factor rises exponentially in case of risk occurrence. In this paper, most appropriate risk classification is made based on technological, organizational, political, natural climatic, security and environmental risk factors. Effort has been made to device a simpler risk management methodology to analyze and manage risks of gas pipeline project. In the proposed risk management model Monte Carlo simulation has been used to identify critical risks. (author)

  7. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  8. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  9. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  10. Clean development mechanism projects and portfolio risks

    International Nuclear Information System (INIS)

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  11. Private Finance Initiative (PFI for Road Projects in UK: Current Practice with a Case Study

    Directory of Open Access Journals (Sweden)

    Rifat Akbiyikli

    2011-05-01

    Full Text Available The long-term sustainable provision of new and high quality maintained road stock is vitally important, especially in times of economic constraint such as Europe is currently experiencing. The Private Finance Initiative (PFI is one method of financing such large-scale, capital intensive projects. An important aspect of this form of financing projects is that the risks are borne not only by the sponsors but are shared by different types of investors such as equity holders, debt providers, and quasi-equity investors. Consequently, a comprehensive and heuristic risk management process is essential for the success of the project. The proposition made within this paper is that the PFI mechanism provides a Value-for-Money and effective mechanism to achieve this. The structure of this PFI finance and investment on a particular road project therefore enables all project stakeholders to take a long-term perspective. This long-term perspective is reflected in the mechanism of a case study of UK – Class A trunk roads which are examined in detail. This paper presents a novel solution to a modern dilemma.

  12. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  13. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  14. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  15. PECULIARITIES OF ASSESSMENT AND RISK MANAGEMENT IN INNOVATIVE PROJECTS

    Directory of Open Access Journals (Sweden)

    Victor V. Guzhov

    2014-01-01

    Full Text Available The methodological and methodicalbases of risk management in innovativeprojects. Classification of risks. Types of risks depending on the stage of realizationof the innovative project. Investigated thefactors contributing to the emergence ofrisk situations. The basic techniques of risk management of innovation projects.Proposed criteria for the choice of the innovative project to implement in the realsector of the economy.

  16. Project finance risk evaluation of the Electric power industry of Serbia

    International Nuclear Information System (INIS)

    Makajic Nikolic, Dragana; Jednak, Sandra; Benkovic, Sladana; Poznanic, Vladimir

    2011-01-01

    From the aspect of the development of a country, the energy sector represents a domain of strategic interest. Generation and use of energy resources most often belongs to the public sector, and are most often under the influence of the government in most countries. This paper analyzes the risks that are characteristic to the business of the public enterprise, Electric Power Industry of Serbia (EPS). EPS has started its restructuring and is adjusting to changes and challenges imposed by the launched reforms in the energy sector. However, due to certain limitations, it is still not possible to implement its complete restructuring and modernization. The paper aims to point at the risks a potential strategic partner faces. The risks have been identified as commercial, financial and political, classification immanent for project finance, and their evaluation was done using Failure Mode and Effects Analysis (FMEA). Risk analysis was performed based on current conditions for two potential scenarios that predict different types of changes in the analyzed period. The results of the analysis show that the potential strategic partner should pay special attention to price risks, estimation, investments, project activity neglect, quasi-risks and debt collection. - Highlights: → Paper analyze all risks characteristic for business running of the public enterprise EPS. → Potential strategic partner faces with the commercial, financial and political risks. → Risk analysis was done using FMEA. → Results are indicating high risk of investing in EPS. → The highest risks are commercial risks, especially price risks.

  17. Network theory-based analysis of risk interactions in large engineering projects

    International Nuclear Information System (INIS)

    Fang, Chao; Marle, Franck; Zio, Enrico; Bocquet, Jean-Claude

    2012-01-01

    This paper presents an approach based on network theory to deal with risk interactions in large engineering projects. Indeed, such projects are exposed to numerous and interdependent risks of various nature, which makes their management more difficult. In this paper, a topological analysis based on network theory is presented, which aims at identifying key elements in the structure of interrelated risks potentially affecting a large engineering project. This analysis serves as a powerful complement to classical project risk analysis. Its originality lies in the application of some network theory indicators to the project risk management field. The construction of the risk network requires the involvement of the project manager and other team members assigned to the risk management process. Its interpretation improves their understanding of risks and their potential interactions. The outcomes of the analysis provide a support for decision-making regarding project risk management. An example of application to a real large engineering project is presented. The conclusion is that some new insights can be found about risks, about their interactions and about the global potential behavior of the project. - Highlights: ► The method addresses the modeling of complexity in project risk analysis. ► Network theory indicators enable other risks than classical criticality analysis to be highlighted. ► This topological analysis improves project manager's understanding of risks and risk interactions. ► This helps project manager to make decisions considering the position in the risk network. ► An application to a real tramway implementation project in a city is provided.

  18. The Risks of Investments in Transport Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    O. Pokorná

    2002-01-01

    Full Text Available Investment decisions should not be taken without an in-depth analysis of the risks. This is an important stage in project preparation and should be performed simultaneously with the planning of the financial operations. Infrastructure development requires that project risks and responsibilities be assigned to the public or private entity that is best able to manage them. The risks and their financial impacts are usually not quantified equally by all parties. Each party views the given risks according to the guarantees provided. These guarantees are related to the form of participation in the project.

  19. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  20. Security Risk Assessment in Software Development Projects

    OpenAIRE

    Svendsen, Heidi

    2017-01-01

    Software security is increasing in importance, linearly with vulnerabilities caused by software flaws. It is not possible to spend all the project s resources on software security. To spend the resources given to security in an effective way, one should know what is most important to protect. By performing a risk analysis the project know which vulnerabilities they face. A risk analysis will prioritise the vulnerabilities, and when the vulnerabilities are prioritised the project know where th...

  1. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  2. Sound transit climate risk reduction project.

    Science.gov (United States)

    2013-09-01

    The Climate Risk Reduction Project assessed how climate change may affect Sound Transit commuter rail, light rail, and express bus : services. The project identified potential climate change impacts on agency operations, assets, and long-term plannin...

  3. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  4. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  5. Modeling Research Project Risks with Fuzzy Maps

    Science.gov (United States)

    Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana

    2009-01-01

    The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…

  6. Method ranks competing projects by priorities, risk

    International Nuclear Information System (INIS)

    Moeckel, D.R.

    1993-01-01

    A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerning various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time

  7. Longitudinal Impact of the Project PATHS on Adolescent Risk Behavior: What Happened after Five Years?

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2012-01-01

    Full Text Available The present study investigated the longitudinal impact of the Project PATHS, a large-scale curriculum-based positive youth development program in Hong Kong, on the development of adolescents’ risk behavior over a period of five years. Using a longitudinal randomized controlled design, eight waves of data were collected from 19 experimental schools in which students participated in the Project PATHS (=2,850 at Wave 8 and 24 control schools without joining the Project PATHS (=3,640 at Wave 8. At each wave, students responded to measures assessing their current risk behaviors, including delinquency, use of different types of drug, and their intentions of participating in risk behaviors in the future. Results demonstrated that adolescents receiving the program exhibited significantly slower increases in delinquent behaviors and substance use as compared to the control participants. During two years after the completion of the program, differences in youth risk behaviors in the two groups still existed. These results suggest that the Project PATHS has long-term effect in preventing adolescent problem behavior through promoting positive youth development.

  8. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  9. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  10. Incorporating the Technology Roadmap Uncertainties into the Project Risk Assessment

    International Nuclear Information System (INIS)

    Bonnema, B.E.

    2002-01-01

    This paper describes two methods, Technology Roadmapping and Project Risk Assessment, which were used to identify and manage the technical risks relating to the treatment of sodium bearing waste at the Idaho National Engineering and Environmental Laboratory. The waste treatment technology under consideration was Direct Vitrification. The primary objective of the Technology Roadmap is to identify technical data uncertainties for the technologies involved and to prioritize the testing or development studies to fill the data gaps. Similarly, project management's objective for a multi-million dollar construction project includes managing all the key risks in accordance to DOE O 413.3 - ''Program and Project Management for the Acquisition of Capital Assets.'' In the early stages, the Project Risk Assessment is based upon a qualitative analysis for each risk's probability and consequence. In order to clearly prioritize the work to resolve the technical issues identified in the Technology Roadmap, the issues must be cross- referenced to the project's Risk Assessment. This will enable the project to get the best value for the cost to mitigate the risks

  11. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  12. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  13. Using prior risk-related knowledge to support risk management decisions: lessons learnt from a tunneling project.

    Science.gov (United States)

    Cárdenas, Ibsen Chivatá; Al-Jibouri, Saad S H; Halman, Johannes I M; van de Linde, Wim; Kaalberg, Frank

    2014-10-01

    The authors of this article have developed six probabilistic causal models for critical risks in tunnel works. The details of the models' development and evaluation were reported in two earlier publications of this journal. Accordingly, as a remaining step, this article is focused on the investigation into the use of these models in a real case study project. The use of the models is challenging given the need to provide information on risks that usually are both project and context dependent. The latter is of particular concern in underground construction projects. Tunnel risks are the consequences of interactions between site- and project-specific factors. Large variations and uncertainties in ground conditions as well as project singularities give rise to particular risk factors with very specific impacts. These circumstances mean that existing risk information, gathered from previous projects, is extremely difficult to use in other projects. This article considers these issues and addresses the extent to which prior risk-related knowledge, in the form of causal models, as the models developed for the investigation, can be used to provide useful risk information for the case study project. The identification and characterization of the causes and conditions that lead to failures and their interactions as well as their associated probabilistic information is assumed to be risk-related knowledge in this article. It is shown that, irrespective of existing constraints on using information and knowledge from past experiences, construction risk-related knowledge can be transferred and used from project to project in the form of comprehensive models based on probabilistic-causal relationships. The article also shows that the developed models provide guidance as to the use of specific remedial measures by means of the identification of critical risk factors, and therefore they support risk management decisions. Similarly, a number of limitations of the models are

  14. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  15. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  16. WAYS TO IMPROVE RISK MANAGEMENT IN COMPLEX PROJECTS

    Directory of Open Access Journals (Sweden)

    Emilia IORDACHE

    2012-01-01

    Full Text Available Risk is present in all human activities; it can be associated with health, security, economy or environment. The goal of risk management is to control, prevent or decrease potential damages. Technically speaking, risk management means all the activities coordinated so as to orient and monitor an organization from the risk perspective. Risk management helps formulate the most adequate decisions by taking account of uncertainties and their effects upon the accomplishment of proposed goals, and argues the need to lay down and implement coercive, preventive actions typical of the management of a company. The benefits of good risk management and also the consequences of bad management shall undoubtedly be felt by an organization’s board, employees, shareholders, customers as well as by all other entities concerned with organizational performance. Projects generally include a number of risks in common with those in business as well as certain typical ones. In complex projects, it is this very feature – complexity – which generates the need to implement risk management for the purpose to diminish, remove, and monitor the risks which can influence the development of a project.

  17. Risk assessment for construction projects of transport infrastructure objects

    Science.gov (United States)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  18. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  19. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  20. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  1. Effect of risk aversion on prioritizing conservation projects.

    Science.gov (United States)

    Tulloch, Ayesha I T; Maloney, Richard F; Joseph, Liana N; Bennett, Joseph R; Di Fonzo, Martina M I; Probert, William J M; O'Connor, Shaun M; Densem, Jodie P; Possingham, Hugh P

    2015-04-01

    Conservation outcomes are uncertain. Agencies making decisions about what threat mitigation actions to take to save which species frequently face the dilemma of whether to invest in actions with high probability of success and guaranteed benefits or to choose projects with a greater risk of failure that might provide higher benefits if they succeed. The answer to this dilemma lies in the decision maker's aversion to risk--their unwillingness to accept uncertain outcomes. Little guidance exists on how risk preferences affect conservation investment priorities. Using a prioritization approach based on cost effectiveness, we compared 2 approaches: a conservative probability threshold approach that excludes investment in projects with a risk of management failure greater than a fixed level, and a variance-discounting heuristic used in economics that explicitly accounts for risk tolerance and the probabilities of management success and failure. We applied both approaches to prioritizing projects for 700 of New Zealand's threatened species across 8303 management actions. Both decision makers' risk tolerance and our choice of approach to dealing with risk preferences drove the prioritization solution (i.e., the species selected for management). Use of a probability threshold minimized uncertainty, but more expensive projects were selected than with variance discounting, which maximized expected benefits by selecting the management of species with higher extinction risk and higher conservation value. Explicitly incorporating risk preferences within the decision making process reduced the number of species expected to be safe from extinction because lower risk tolerance resulted in more species being excluded from management, but the approach allowed decision makers to choose a level of acceptable risk that fit with their ability to accommodate failure. We argue for transparency in risk tolerance and recommend that decision makers accept risk in an adaptive management

  2. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  3. Risk-profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as an insurance vehicle and can be used at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. Either futures of swaps can be used to guarantee or modify product prices. While this does not necessarily maximize cash flow or present worth, it can protect a project or company for several years from downside price risk, thereby reducing the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cash flows or net incomes. This paper reports that reducing risk by limiting downside price exposure could alter budgeting decisions, allow continued or expanded operations of a particular property, or increase debt capacity

  4. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  5. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    Science.gov (United States)

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  6. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  7. Managing a complex project using a risk-risk multiple domain matrix

    International Nuclear Information System (INIS)

    Pointurier, C.; Marle, F.; Jaber, H.

    2014-01-01

    This communication aims at presenting a clustering methodology applied to a complex project consisting of the delivery of three interdependent subsystems. This enables small and complementary task forces to be constituted, enhancing the communication and coordination on transverse issues related to the complexity of the whole system. The problem is to gather and exploit data for such systems, with numerous and heterogeneous risks of different domains (product, process, organization). The method consists in regrouping actors through the clustering of the risks they own. The result is a highlight on important and transverse risk interdependencies, within and between projects. These should not be neglected in order to avoid potential severe issues, whether during the project or during the exploitation of its deliverable. An application on a real program of plant implementation in the CEA-DAM is presented, with a sensitivity analysis of the clustering results to the inputs and chosen configurations of the problem. (authors)

  8. Acute Radiation Risk and BRYNTRN Organ Dose Projection Graphical User Interface

    Science.gov (United States)

    Cucinotta, Francis A.; Hu, Shaowen; Nounu, Hateni N.; Kim, Myung-Hee

    2011-01-01

    The integration of human space applications risk projection models of organ dose and acute radiation risk has been a key problem. NASA has developed an organ dose projection model using the BRYNTRN with SUM DOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUM DOSE are a Baryon transport code and an output data processing code, respectively. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN. A GUI for the ARR and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. BRYNTRN code operation requires extensive input preparation. Only a graphical user interface (GUI) can handle input and output for BRYNTRN to the response models easily and correctly. The purpose of the GUI development for ARRBOD is to provide seamless integration of input and output manipulations for the operations of projection modules (BRYNTRN, SLMDOSE, and the ARR probabilistic response model) in assessing the acute risk and the organ doses of significant Solar Particle Events (SPEs). The assessment of astronauts radiation risk from SPE is in support of mission design and operational planning to manage radiation risks in future space missions. The ARRBOD GUI can identify the proper shielding solutions using the gender-specific organ dose assessments in order to avoid ARR symptoms, and to stay within the current NASA short-term dose limits. The quantified evaluation of ARR severities based on any given shielding configuration and a specified EVA or other mission

  9. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  10. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  11. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  12. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  13. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie

    2014-01-01

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  14. Risk Assessment of Engineering Project Financing Based on PPP Model

    Directory of Open Access Journals (Sweden)

    Ma Qiuli

    2017-01-01

    Full Text Available At present, the project financing channel is single, and the urban facilities are in short supply, and the risk assessment and prevention mechanism of financing should be further improved to reduce the risk of project financing. In view of this, the fuzzy comprehensive evaluation model of project financing risk which combined the method of fuzzy comprehensive evaluation and analytic hierarchy process is established. The scientificalness and effectiveness of the model are verified by the example of the world port project in Luohe city, and it provides basis and reference for engineering project financing based on PPP mode.

  15. Risk Management and Uncertainty in Large Complex Public Projects

    DEFF Research Database (Denmark)

    Neerup Themsen, Tim; Harty, Chris; Tryggestad, Kjell

    Governmental actors worldwide are promoting risk management as a rational approach to man-age uncertainty and improve the abilities to deliver large complex projects according to budget, time plans, and pre-set project specifications: But what do we know about the effects of risk management...... on the abilities to meet such objectives? Using Callon’s (1998) twin notions of framing and overflowing we examine the implementation of risk management within the Dan-ish public sector and the effects this generated for the management of two large complex pro-jects. We show how the rational framing of risk...... management have generated unexpected costly outcomes such as: the undermining of the longer-term value and societal relevance of the built asset, the negligence of the wider range of uncertainties emerging during project processes, and constraining forms of knowledge. We also show how expert accountants play...

  16. Current status of the AUSTRON project

    International Nuclear Information System (INIS)

    Rauch, H.; Regler, M.; Lechner, R.E.; Weber, H.

    2001-01-01

    The current status of the AUSTRON spallation source project is described with reference to the need for neutrons in Europe and - due to a certain West-East imbalance of large research facilities - especially in Central Europe. A short overview about technical aspects of proton accelerator, rapid cycling synchrotron, storage ring, target and instrumentation is presented. (author)

  17. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  18. Current products and future plan of regulatory research for risk-informed regulation in Korea

    International Nuclear Information System (INIS)

    Sung, Key Yong; Lee, Chang Ju; Kim, Woong Sik; Kim, Hho Jung

    2003-01-01

    The first phase of a regulatory research project for risk-informed regulation (RIR) and applications (RIA) was finished in March of 2002. Various results that could be useful for preparing Korean RIR system have been developed. One of the remarkable outputs is development of reactor safety goals and acceptance criteria for RIR and RIA in Korea. The Safety Goal has a 4-tier hierarchical structure and each tier has specified goals classified for their usage. Regulatory review guides for probabilistic safety assessment (PSA) including level-1, level-2 and low power and shutdown PSA have been updated by reflecting new information obtained from not only the overseas documents but also experience and insights from regulatory review in Korea. In addition, draft regulatory guides for risk-informed in-service inspection, in-service testing, importance ranking of motor-operated valves, and AOT/STI change of Technical Specifications have been developed for preparing ongoing and future licensing work. Risk-based inspection guides with inspection items selected from a viewpoint of risk importance have been suggested for Korean standard NPPs as well. In the second phase of a research project (April of 2002 to March of 2005), two regulatory research projects on RIR were initiated. One is a study on institutionalization of risk-informed and performance-based regulation. Main topics of this project are evaluation of benefit and characteristics of RIR, development of optimized Korean RIR model, impact analysis for the change of current regulation framework, and suggestion of RIR-related laws and rules. The other is focusing on the development in the areas of a regulatory audit PSA model and regulatory guides for risk monitoring, and application techniques of risk information to the significance determination of plant performance indicators and inspection findings. It is expected that a concrete scheme and detailed regulatory techniques for embodiment of RIR system in Korea will be

  19. Aquantis C-Plane Ocean Current Turbine Project

    Energy Technology Data Exchange (ETDEWEB)

    Fleming, Alex [Dehlsen Associates, LLC, Santa Barbara, CA (United States)

    2015-09-16

    The Aquantis 2.5 MW Ocean Current Generation Device technology developed by Dehlsen Associates, LLC (DA) is a derivation of wind power generating technology (a means of harnessing a slow moving fluid) adapted to the ocean environment. The Aquantis Project provides an opportunity for accelerated technological development and early commercialization, since it involves the joining of two mature disciplines: ocean engineering and wind turbine design. The Aquantis Current Plane (C-Plane) technology is an ocean current turbine designed to extract kinetic energy from a current flow. The technology is capable of achieving competitively priced, continuous, base-load, and reliable power generation from a source of renewable energy not before possible in this scale or form.

  20. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    Science.gov (United States)

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  1. Financial risks in major investment projects

    International Nuclear Information System (INIS)

    Segelod, Esbjoern

    2006-01-01

    We have probably all read about large projects which proved far more expensive than anticipated, projects such as the Channel tunnel which cost 80% more than planned, and the oil pipeline between the oil field in Prudhoe Bay in Northern Alaska and the oil terminal in Vadez in the south which overran its budget by 1,000%. The purpose of this paper is to summarise our knowledge of the risk of cost escalation. Which projects are more likely than others to be hit by cost escalation, and why

  2. Risk Management Improvement of Engineering Projects in Woodworking Industry

    Directory of Open Access Journals (Sweden)

    Simona Bartkutė

    2014-02-01

    Full Text Available Risk is a complex phenomenon that has physical, monetary, cultural and social dimensions. Every company wants tosave money, time, increase quality, optimise manufacturing, but each factor may involve different risks with different influenceto company, its reputation. The aim of the research is to find better risk management improvement decisions, using techniquesthat could help to reduce risk impact in wood-based nonstandard production with shorter project time, smoother design process,lower costs, better project coordination, increased ability to manage problems, technical solutions.

  3. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  4. The Role and the Effects of Risk Management in IT Projects Success

    Directory of Open Access Journals (Sweden)

    Otniel DIDRAGA

    2013-01-01

    Full Text Available The success of IT projects is influenced by risk and risk management according to the existing project management literature. The paper emphasizes the role of risk management and its contribution to projects success in the existing literature. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2012 from the main IT project management journals and publications. The results are that risk management is a very important component of the project management process and it is assumed implicitly to work in favour of project success. We also performed a quantitative analysis of how risk management processes affect the subjective and objective performance of IT projects in Romanian IT companies.

  5. Renewable fuels: Policy effectiveness and project risk

    International Nuclear Information System (INIS)

    Leach, Andrew; Doucet, Joseph; Nickel, Trevor

    2011-01-01

    This paper examines the impact of government policy on the risk profile of a small ethanol production facility. We derive four key results from a simulation model. First, we show that commodity price risk may discourage investment in a project, despite a positive expected rate of return. Second, we show that political uncertainty may have significant impacts on the risk profile of a project. Next, we show that using only production subsidies to attract investors is expensive, since the financial assistance is paid regardless of whether the plant is operating under positive or negative financial conditions. Finally, we show that a capital grant provides a valuable complement to a subsidy, because the grant reduces the amount of value investors must put at risk, and increases their leverage thereby enhancing returns, while the subsidy mitigates commodity price risk. Our results show that compared to a subsidy-only approach, a grant and subsidy combination provides an investment environment with similar downside protection and expected returns for less than 60% of the cost. Further, we show that the two policy tools combined yield a superior investment environment to that created by an equivalent or greater total investment deployed entirely in either of the policy tools without the other. - Research highlights: → We find that government policy may increase both project returns and risk. → We find a policy of capital grants combined with an output price support to be preferred. → Price supports alone will tend to reward those plants which need them the least.

  6. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  7. Risk identification for PPP waste-to-energy incineration projects in China

    International Nuclear Information System (INIS)

    Song, Jinbo; Song, Danrong; Zhang, Xueqing; Sun, Yan

    2013-01-01

    Municipal solid waste (MSW) is regarded as a renewable energy source. In China, the sharp increase of MSW has precipitated the rapid growth of waste-to-energy (WTE) incineration plants. Private capital has been getting into the WTE incineration industry through the public–private partnership (PPP) arrangement. Due to the large construction cost and the long concession period commonly associated with this arrangement, a number of failures have emerged in PPP WTE incineration projects. The aim of this paper is to investigate the key risks of PPP WTE incineration projects in China and study the strategies for managing these risks by drawing experience and learning lessons from these projects. First, we analyzed the MSW management practices, relevant legislations and policies, and the development of PPP WTE incineration projects in China. Second, we identified ten key risks through interviews, surveys and visits to some selected projects, and provided detailed analysis of these risks. Lastly, we developed response strategies for these risks from the perspectives of both public and private sectors. - Highlights: • We analyze MSW management practices, relevant legislations and policies in China. • Through case study on PPP WTE incineration projects, ten key risks are identified. • Response strategies for key risks are developed

  8. Patient safety in external beam radiotherapy, results of the ACCIRAD project: Current status of proactive risk assessment, reactive analysis of events, and reporting and learning systems in Europe.

    Science.gov (United States)

    Malicki, Julian; Bly, Ritva; Bulot, Mireille; Godet, Jean-Luc; Jahnen, Andreas; Krengli, Marco; Maingon, Philippe; Prieto Martin, Carlos; Przybylska, Kamila; Skrobała, Agnieszka; Valero, Marc; Jarvinen, Hannu

    2017-04-01

    To describe the current status of implementation of European directives for risk management in radiotherapy and to assess variability in risk management in the following areas: 1) in-country regulatory framework; 2) proactive risk assessment; (3) reactive analysis of events; and (4) reporting and learning systems. The original data were collected as part of the ACCIRAD project through two online surveys. Risk assessment criteria are closely associated with quality assurance programs. Only 9/32 responding countries (28%) with national regulations reported clear "requirements" for proactive risk assessment and/or reactive risk analysis, with wide variability in assessment methods. Reporting of adverse error events is mandatory in most (70%) but not all surveyed countries. Most European countries have taken steps to implement European directives designed to reduce the probability and magnitude of accidents in radiotherapy. Variability between countries is substantial in terms of legal frameworks, tools used to conduct proactive risk assessment and reactive analysis of events, and in the reporting and learning systems utilized. These findings underscore the need for greater harmonisation in common terminology, classification and reporting practices across Europe to improve patient safety and to enable more reliable inter-country comparisons. Copyright © 2017 Elsevier B.V. All rights reserved.

  9. Risk analysis for renewable energy projects due to constraints arising

    Science.gov (United States)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  10. Coordination of Project and Current Activities on the Basis of the Strategy Alignment Metamodel in the Oil and Gas Company

    Directory of Open Access Journals (Sweden)

    R. Yu. Dashkov

    2017-01-01

    Full Text Available Purpose: the purpose of this article is to describe the Strategy Alignment Metamodel of the project and current activities, which allows us to connect the Goals and Strategies for Phases of the project with the Goals and Strategies of the company at all levels of the organization through targeted measurement and application of Interpretive Models. Building Networks of Goals and Strategies, and adopting organizational solutions, you coordinate the interaction of the Project office and departments of the company. This methodology is based on a Logical Rationale of the Contexts and Assumptions for establishing Goals and Strategies both for the project and for the company, and on preparation of Contexts and Assumptions, Goals and Strategies Alignment Matrices, which provides a flexible adaptation to the internal and external environment in the process of selecting the most successful Strategies to achieve the Goals. Methods: this article is based on the concept of Goals-Questions-Metrics+ Strategies, which is adapted as another concept of strategic monitoring and control system of projects: Goals-Phases-Metrics+Strategies. These concepts have formed the basis of the Strategy Alignment Metamodel, where a technology of Phases Earned Value Management is used as a measurement system for the project activity, and Balanced scorecard is applied for current operations. Results: strategy Alignment Metamodel of the project and current activities of the company is proposed hereby. It uses modern strategic monitoring and control systems for projects: Goals-Phases-Metrics+Strategies, and for the company: Goals-Questions-Metrics+ Strategies. The interaction between these systems is based on Contexts and Assumptions, Goals and Strategies Alignment Matrices. The existence of such matrices greatly simplifies management decisions and prevents the risk of delays in the execution of project Phases based on rational participation and coordination of the company

  11. ANALYSIS OF ECONOMIC RISK IN EUROPEAN INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Margareta Stela FLORESCU

    2012-06-01

    Full Text Available Risk is a reality of the economic environment, with consequences which cannot always be foreseen or anticipated. Risk management becomes more stringent as potential exo/endogenous vulnerability factors are rapidly increasing. Identifying risk areas, structuring risk factors and defining their probability, optimal management of resources in order to reduce risk factors, creating alternatives for each high-probability risk factor are part of project risk management. Risk is quantified through probability and incidence and is assessed using quantitative and qualitative methods.

  12. Revenue Risk Modelling and Assessment on BOT Highway Project

    Science.gov (United States)

    Novianti, T.; Setyawan, H. Y.

    2018-01-01

    The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.

  13. Current status of the IREN project

    International Nuclear Information System (INIS)

    Furman, W.I.

    1997-01-01

    A current status and a corrected time-schedule of the project of the new Intense Resonance Neutron pulsed source (IREN) realized in JINR (Dubna) for experiments dealing with fundamental and applied nuclear physics studies are discussed. This source is the upgraded variant of the existing IBR-30 pulsed booster. It consists of the 200 MeV electron linac and supplying by an electron beam the photo-neutron converter placed in the center of the very fast multiplying subcritical core. The existing buildings and beam infrastructure are planned to adopt for the new IREN source. The aim of the project is to improve essentially an energy resolution of the time-of-flight spectrometer and to increase twice (up to 10 15 n/sec) an integral neutron yield. An implementation of the IREN project has started in June 1994 with the planned end in December 1997. But due to mainly insufficient financing the approved time-schedule is shifted. Now most optimistic time of start-up of the neutron source is the end of 1999

  14. Risk profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought by some to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as insurance and can be utilized at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. This paper reports that either futures or swaps can be used to guarantee or modify product prices, an accomplishment very difficult or impossible to duplicate through other means, particularly with such integrity. Participation in futures or swaps does not necessarily maximize cashflow or present worth, it can either guarantee the price, put a minimum price in place or offer a combination of the above. A project or company can be protected for several years from downside price risk using swaps. Not being subject to market price swings substantially reduces the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cashflows or net incomes

  15. Sustainability Risk Evaluation for Large-Scale Hydropower Projects with Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Weiyao Tang

    2018-01-01

    Full Text Available As large-scale hydropower projects are influenced by many factors, risk evaluations are complex. This paper considers a hydropower project as a complex system from the perspective of sustainability risk, and divides it into three subsystems: the natural environment subsystem, the eco-environment subsystem and the socioeconomic subsystem. Risk-related factors and quantitative dimensions of each subsystem are comprehensively analyzed considering uncertainty of some quantitative dimensions solved by hybrid uncertainty methods, including fuzzy (e.g., the national health degree, the national happiness degree, the protection of cultural heritage, random (e.g., underground water levels, river width, and fuzzy random uncertainty (e.g., runoff volumes, precipitation. By calculating the sustainability risk-related degree in each of the risk-related factors, a sustainable risk-evaluation model is built. Based on the calculation results, the critical sustainability risk-related factors are identified and targeted to reduce the losses caused by sustainability risk factors of the hydropower project. A case study at the under-construction Baihetan hydropower station is presented to demonstrate the viability of the risk-evaluation model and to provide a reference for the sustainable risk evaluation of other large-scale hydropower projects.

  16. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  17. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  18. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  19. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    Science.gov (United States)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  20. Project risk definition and measurement in a not-for-profit setting.

    Science.gov (United States)

    Gapenski, L C

    1992-11-01

    The health care finance literature on capital investment decisions generally applies conventional market risk concepts without distinguishing between proprietary and not-for-profit forms of organization. Since proprietary firms have shareholder wealth maximization as their primary goal, a project's relevant risk is its contribution to the riskiness of the equity investors' well diversified stock portfolios, or its market risk. However, not-for-profit organizations do not have shareholder wealth maximization as their primary goal, and thus market risk concepts are not applicable. Rather, the relevant risk in a not-for-profit setting is a project's corporate risk; that is, the project's contribution to the riskiness of the organization. The difference in risk definition and measurement between proprietary and not-for-profit firms has two implications for managerial decisions: (1) in making capital investment decisions, a manager must define and measure a project's riskiness on the basis of the firm's organizational form; and (2) although diversification for the sole purpose of risk reduction is not a valid rationale for proprietary firms because stockholders can achieve the same result at less cost, risk-reducing diversification does make sense for not-for-profit firms.

  1. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  2. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  3. Shell’s use of science in de-risking projects

    CSIR Research Space (South Africa)

    Rossouw, N

    2017-10-01

    Full Text Available This presentation discusses Shell’s use of science in de-risking projects. The presentation includes examples of applying science in the De-Risking process, supporting scientific research and De-Risking the Karoo Basin....

  4. Study On Risk Handling Strategy Of Road Contruction Projects In Jayapura City

    Directory of Open Access Journals (Sweden)

    Irianto

    2017-08-01

    Full Text Available Project risk is an event or an uncertain condition which if it appears will have a threat on the project object. Many contractors still do not understand the threats that occur in the project they still assume that risks are always harmful. Based on data from the Papua Public Works procurement service that the implementation of road improvement projects always faces problems. This research is an explorative and descriptive study which explores the risks threats that occur in the project from the contractors perspective in Jayapura Papua Province Indonesia. The object of this research is the company contractor involved in the implementation of road improvement project in Jayapura whereas the respondent is the project manager and the field supervisor involved in the implementation of road improvement project The analysis result shows that the overall level of risk is in very low category and the biggest risks affecting contractors in sequence are 1 material delays from suppliers 2 material inventories 3 design difficulties 4 incorrectly shipped material volumes 5 changes to specifications by the owner 6 difficulty in obtaining materials and equipment 7 material price increases 8 over quality 9 damage to machine tools 10 weakening the bearing capacity of subgrade soil. While the response to risks threats that occur in road improvement projects is to reduce and avoid.

  5. Risk Management in Future Romanian E-Government 2.0 Projects

    Directory of Open Access Journals (Sweden)

    Didraga Otniel

    2015-08-01

    Full Text Available E-government public services in Romania must follow unitary procedures considering the new requirements of the European Union from the Digital Agenda for Europe Strategy 2020. E-government 2.0 has to be implemented because of the cultural and behavioral transformations in the interaction between governments and users of e-services. E-government 2.0 projects use tools and techniques of social media to accomplish their goals. This article examines the possible risk categories and the risk management procedures needed to mitigate risks in future Romanian e-government projects, according to the strategic lines of development for the Digital Agenda. We propose a risk management plan for the e-government lines of action within the strategic lines of development that includes identifying, assessing, and mitigating the risks. New and modernized government services through e-government 2.0 projects that apply risk management will bring a significant improvement in how citizens and businesses relate to government and will increase the use of e-government services.

  6. Investment Decision Support for Engineering Projects Based on Risk Correlation Analysis

    Directory of Open Access Journals (Sweden)

    Yan Liu

    2012-01-01

    Full Text Available Investment decisions are usually made on the basis of the subjective judgments of experts subjected to the information gap during the preliminary stages of a project. As a consequence, a series of errors in risk prediction and/or decision-making will be generated leading to out of control investment and project failure. In this paper, the variable fuzzy set theory and intelligent algorithms integrated with case-based reasoning are presented. The proposed algorithm manages the numerous fuzzy concepts and variable factors of a project and also sets up the decision-making process in accordance with past cases and experiences. Furthermore, it decreases the calculation difficulty and reduces the decision-making reaction time. Three types of risk correlations combined with different characteristics of engineering projects are summarized, and each of these correlations is expounded at the project investment decision-making stage. Quantitative and qualitative change theories of variable fuzzy sets are also addressed for investment risk warning. The approach presented in this paper enables the risk analysis in a simple and intuitive manner and realizes the integration of objective and subjective risk assessments within the decision-makers' risk expectation.

  7. Development of Risk Uncertainty Factors from Historical NASA Projects

    Science.gov (United States)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  8. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  9. The integration of the risk in the governance of urban projects: a key issue for a resilient city

    Science.gov (United States)

    Moulin, E.; Deroubaix, J.-F.

    2012-04-01

    Despite a severe regulation concerning the building in flooding areas, 80% of these areas are already built in the Greater Paris (Paris, Val-de-Marne, Hauts-de-Seine and Seine-Saint-Denis). The land use in flooding area is presented as one of the main solutions to solve the ongoing real estate pressure. For instance some of the industrial wastelands located along the river are currently in redevelopment and residential buildings are planned. So landuse in the flooding areas is currently a key issue in the development of the Greater Paris area. Tools and measures, structural or non-structural such as warning systems, barriers, etc do exist and could be a smart way to improve the resilience of the new urbanised areas. The technical solutions are available and efficient, but we notice that these tools are not much implemented. There is a lack of flood risk concern among the stakeholders and the inhabitants1. How landuse stakeholders could integrate the flood risk in the decision making process throughout the implementation of the urban project? Which type of governance favours an efficient development of good flood risk policy including prevention, protection and the management of the crisis? What is the "good" governance of the urban project e.g. enabling to take into account or not to forget the flood risk and to empower the (future) inhabitants? This inhabitants' empowerment includes the improvement of awareness (i.e. inhabitants being aware that they live in a flooded area) and the improvement of concern (i.e. inhabitants adopting the "right" behaviour when the risk occurs). In order to investigate how flood risk is or could be integrated in the project governance, we interviewed stakeholders (elected representatives, architects, property developers, etc.) and observed the integration or the vanishing of the risk throughout the project. In order to develop this topic we rely on a case study. The "Ardoines" is a project aiming at redeveloping an industrial site

  10. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  11. Research on Risk Evaluation of Transnational Power Networking Projects Based on the Matter-Element Extension Theory and Granular Computing

    Directory of Open Access Journals (Sweden)

    Jinying Li

    2017-10-01

    Full Text Available In project management, risk assessment is crucial for stakeholders to identify the risk factors during the whole life cycle of the project. A risk evaluation index system of a transnational networking project, which provides an effective way for the grid integration of clean electricity and the sustainable development of the power industry, is constructed in this paper. Meanwhile, a combination of granular computing and order relation analysis (G1 method is applied to determine the weight of each indicator and the matter-element extension evaluation model is also employed to seek the global optimal decision during the risk assessment. Finally, a case study is given to validate the index system and evaluation model established in this paper by assessing two different investment schemes of a transnational high voltage direct current (HVDC transmission project. The result shows that the comprehensive risk level of Scheme 1 is “Low” and the level of Scheme 2 is “General”, which means Scheme 1 is better for the stakeholders from the angle of risk control. The main practical significance of this paper lies in that it can provide a reference and decision support for the government’s power sectors, investment companies and other stakeholders when carrying out related activities.

  12. Shedding New Light on Project Portfolio Risk Management

    Directory of Open Access Journals (Sweden)

    Mariusz Hofman

    2017-10-01

    Full Text Available This paper constitutes an innovative attempt to analyse the risks and negative phenomena dependencies within a project portfolio. Based on the available literature, the risks and negative phenomena (that is, the problems with the availability of resources, interpersonal conflicts, irregularities in the portfolio balance, etc. specific to a project portfolio were identified. Theoretical constructs were then used to connect the identified risks with the negative phenomena. Structural equations were used to confirm the existence and quality of these constructs, as well as models describing connections between phenomena. The determination of the structural equations also provided a setting in which statistical methods (χ2, RMSEA and CFI could be used to investigate the level of fit of the constructs and models to the empirical data.

  13. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  14. Research into specific risk assessment in project financing

    Directory of Open Access Journals (Sweden)

    Ivana Bestvina Bukvić

    2013-12-01

    Full Text Available An assessment of investment justification in terms of risk enables the decision maker (investor to select, among available alternatives, the one with the most favourable correlation between the expected profit and assumed risk. At the micro level, the uncertainty of business success is extremely high in production activities, which is an additional incentive for taking a comprehensive approach to the issue of investment decision-making and the development of risk assessment techniques applicable in this particular segment of industry. Given the complexity of the manufacturing process, the length of the production cycle, market conditions, and entity-specific risks (which are difficult to measure, projects in manufacturing industry require a detailed and comprehensive assessment of specific risk factors and their cost-effectiveness. Ne - vertheless, since specific risks can be diversified, investment proposal assessments in practice usually do not cover their quantification and analysis. However, the majority of business entities do not have enough active projects in various industries to be able to fully diversify their business and thus minimize the level of specific risks. The impact of specific factors becomes one of the most important elements for business success. This paper analyses how far risk assessment methods regarding specific risks are used in practice. Furthermore, it analyses the significance of specific risks for total investment risk. This study gives new insi - ghts into the significance of specific risks to the overall investment assessment and the need for permanent development of traditionally used investment assessment models.

  15. ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE

    Energy Technology Data Exchange (ETDEWEB)

    Sathaye, Jayant; Dale, Larry; Larsen, Peter; Fitts, Gary; Koy, Kevin; Lewis, Sarah; Lucena, Andre

    2011-06-22

    This report outlines the results of a study of the impact of climate change on the energy infrastructure of California and the San Francisco Bay region, including impacts on power plant generation; transmission line and substation capacity during heat spells; wildfires near transmission lines; sea level encroachment upon power plants, substations, and natural gas facilities; and peak electrical demand. Some end-of-century impacts were projected:Expected warming will decrease gas-fired generator efficiency. The maximum statewide coincident loss is projected at 10.3 gigawatts (with current power plant infrastructure and population), an increase of 6.2 percent over current temperature-induced losses. By the end of the century, electricity demand for almost all summer days is expected to exceed the current ninetieth percentile per-capita peak load. As much as 21 percent growth is expected in ninetieth percentile peak demand (per-capita, exclusive of population growth). When generator losses are included in the demand, the ninetieth percentile peaks may increase up to 25 percent. As the climate warms, California's peak supply capacity will need to grow faster than the population.Substation capacity is projected to decrease an average of 2.7 percent. A 5C (9F) air temperature increase (the average increase predicted for hot days in August) will diminish the capacity of a fully-loaded transmission line by an average of 7.5 percent.The potential exposure of transmission lines to wildfire is expected to increase with time. We have identified some lines whose probability of exposure to fire are expected to increase by as much as 40 percent. Up to 25 coastal power plants and 86 substations are at risk of flooding (or partial flooding) due to sea level rise.

  16. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  17. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    Science.gov (United States)

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  18. Improvement of the projection models for radiogenic cancer risk

    International Nuclear Information System (INIS)

    Tong Jian

    2005-01-01

    Calculations of radiogenic cancer risk are based on the risk projection models for specific cancer sites. Improvement has been made for the parameters used in the previous models including introductions of mortality and morbidity risk coefficients, and age-/ gender-specific risk coefficients. These coefficients have been applied to calculate the radiogenic cancer risks for specific organs and radionuclides under different exposure scenarios. (authors)

  19. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  20. Overview of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

    Science.gov (United States)

    Kim, Myung-Hee Y.; Hu, Shaowen; Nounu, Hatem N.; Cucinotta, Francis A.

    2010-01-01

    Solar particle events (SPEs) pose the risk of acute radiation sickness (ARS) to astronauts, because organ doses from large SPEs may reach critical levels during extra vehicular activities (EVAs) or lightly shielded spacecraft. NASA has developed an organ dose projection model of Baryon transport code (BRYNTRN) with an output data processing module of SUMDOSE, and a probabilistic model of acute radiation risk (ARR). BRYNTRN code operation requires extensive input preparation, and the risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, these response models can be connected easily and correctly to BRYNTRN in a user friendly way. The GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. Assessment of astronauts organ doses and ARS from the exposure to historically large SPEs is in support of mission design and operation planning to avoid ARS and stay within the current NASA short-term dose limits. The ARRBOD GUI will serve as a proof-of-concept for future integration of other risk projection models for human space applications. We present an overview of the ARRBOD GUI product, which is a new self-contained product, for the major components of the overall system, subsystem interconnections, and external interfaces.

  1. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  2. From field studies to risk management: the Sensib project

    International Nuclear Information System (INIS)

    Mercat-Rommens, C.; Renaud, P.

    2004-01-01

    The consequences for the man and the environment of the discharges of nuclear facilities depend on the importance and the nature of the discharges, but also on the environment which receives them. Thus, the impact of a pollution, which is expressed in term of toxicity, risk or economic consequences, varies according to the characteristics of the environment and the use of this environment by the man. The radioecological sensitivity can be defined as the response of the environment to a radioactive pollution. This response is expressed through various indicators: the activity of a radionuclide at a precise moment, a stock of radionuclide in a given environmental compartment or a flux of radionuclide... For a determined discharge, the higher is the response, the more sensitive is the environment. If all the ecosystems appear sensitive, their sensitivity does not concern the same criteria and it is currently difficult to compare these criteria between them; is it more hazardous to have a stock of radioactivity present in a natural space or to have an important but time-limited concentration of radionuclides in a river used for irrigation? The idea of the SENSIB project is to create a standardized tool which makes it possible to represent and to compare with the same scale the sensitivity of various ecosystems. The sensitivity indexes, which will be developed during the project, aim to represent the intensity of the environmental response. These indicators, which are the result of the transfer of the radionuclides in the environment, depend on various intrinsic parameters of the ecosystems (climate, soil, agricultural practises...). The SENSIB project, based on results of field studies conducted by IRSN, aims to develop both a methodology to calculate sensitivity indexes and a radioecological sensitivity scale usable for risk management. (author)

  3. Multiobjective genetic algorithm approaches to project scheduling under risk

    OpenAIRE

    Kılıç, Murat; Kilic, Murat

    2003-01-01

    In this thesis, project scheduling under risk is chosen as the topic of research. Project scheduling under risk is defined as a biobjective decision problem and is formulated as a 0-1 integer mathematical programming model. In this biobjective formulation, one of the objectives is taken as the expected makespan minimization and the other is taken as the expected cost minimization. As the solution approach to this biobjective formulation genetic algorithm (GA) is chosen. After carefully invest...

  4. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  5. A Hybrid MCDM Technique for Risk Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Kajal Chatterjee

    2018-02-01

    Full Text Available Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary to quantify the main risk indicators of the projects. Managing these requires suitable risk mitigation strategies to evaluate and analyse their severity. The existence of information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, to ensure balanced satisfaction of all participants, risk evaluation of these projects can be considered as an important part of the multi-criteria decision-making (MCDM process. In real-life problems, evaluation of project risks is often uncertain and even incomplete, and the prevailing methodologies fail to handle such situations. To address the problem, this paper extends the analytical network process (ANP methodology in the D numbers domain to handle three types of ambiguous information’s, viz. complete, uncertain, and incomplete, and assesses the weight of risk criteria. The D numbers based approach overcomes the deficiencies of the exclusiveness hypothesis and completeness constraint of Dempster–Shafer (D–S theory. Here, preference ratings of the decision matrix for each decision-maker are determined using a D numbers extended consistent fuzzy preference relation (D-CFPR. An extended multi-attributive border approximation area comparison (MABAC method in D numbers is then developed to rank and select the best alternative risk response strategy. Finally, an illustrative example from construction sector is presented to check the feasibility of the proposed approach. For checking the reliability of alternative ranking, a comparative analysis is performed with different MCDM approaches in D numbers domain. Based on different criteria weights, a sensitivity analysis of obtained ranking of the hybrid D-ANP-MABAC model is performed to verify the robustness of the proposed

  6. Risk Assessment in Financial Feasibility of Tanker Project Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Muhammad Badrus Zaman

    2017-09-01

    Full Text Available Every ship project would not be apart from risk and uncertainty issues. The inappropriate risk assessment process would have long-term impact, such as financial loss. Thus, risk and uncertainties analysis would be a very important process in financial feasibility determination of the project. This study analyzes the financial feasibility of 17,500 LTDW tanker project. Risk and uncertainty are two differentiated terminologies in this study, where risk focuses on operational risk due to shipbuilding process nonconformity to shipowner finance, while uncertainty focuses on variable costs that affect project cash flows. There are three funding scenarios in this study, where the percentage of funding with own capital and bank loan in scenario 1 is 100% : 0%, scenario 2 is 75% : 25%, and scenario 3 is 50% : 50%. Monte Carlo simulation method was applied to simulate the acceptance criteria, such as net present value (NPV, internal rate of return (IRR, payback period (PP, and profitability index (PI. The results of simulation show that 17,500 LTDW tanker project funding by scenario 1, 2 and 3 are feasible to run, where probability of each acceptance criteria was greater than 50%. Charter rate being the most sensitive uncertainty over project's financial feasibility parameters.

  7. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    Science.gov (United States)

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  8. KPMU projects. Current environmental situation and expected developments

    International Nuclear Information System (INIS)

    Ribarska, T.

    2010-01-01

    The following KPMU projects are described: Dry storage facility, which will allow the dry storage of 5256 fuel assemblies, currently stored in the spent fuel ponds of reactors of Units 3,4 and the WSF; Projects for equipment and activities related to management of liquid RAW which is already have being implemented on the site and are therefore covered in the current KNPP EIA; Ion Exchange Resin retrieval and Conditioning Equipment; Plasma melting facility; Facility for Retrieval and Processing of The Solidified Phase from Evaporator Concentrate Tanks; Control of Liquid and Gaseous Releases for the Units under Decommissioning at KNPP; Size Reduction and Decontamination Active Workshop –Design, Construction and Equipment Supply and Installation; Supply of: dismantling, size reduction and decontamination tools and equipment; Infrastructure and security perimeter separation; Heat generation plant; EIA for Decommissioning of units 1 to 4; Decay Storage Site for Transitional RAW; Site for Conventional Waste from Decommissioning; Inventory, Treatment and Conditioning of Contaminated Soils; Waste Backlog Treatment

  9. The ChimERA project: Coupling mechanistic exposure and effect models into an integrated platform for ecological risk assessment

    NARCIS (Netherlands)

    Laender, de F.; Brink, van den P.J.; Janssen, C.R.; Guardo, Di A.

    2014-01-01

    Current techniques for the ecological risk assessment of chemical substances are often criticised for their lack of environmental realism, ecological relevance and methodological accuracy. ChimERA is a 3-year project (2013-2016), funded by Cefic's Long Range Initiative (LRI) that aims to address

  10. Managing Risk and Uncertainty in Large-Scale University Research Projects

    Science.gov (United States)

    Moore, Sharlissa; Shangraw, R. F., Jr.

    2011-01-01

    Both publicly and privately funded research projects managed by universities are growing in size and scope. Complex, large-scale projects (over $50 million) pose new management challenges and risks for universities. This paper explores the relationship between project success and a variety of factors in large-scale university projects. First, we…

  11. Risk management tools from the traditional energy industry to wind energy projects

    International Nuclear Information System (INIS)

    Randall, G.; Marks, R.

    2010-01-01

    Risk-based analysis techniques are used to quantify and prioritize a wide variety of problems within the traditional fossil fuel and nuclear power industries. This poster presentation evaluated some of the risk analysis tools and methods used by the energy industry to quantify and manage wind energy development risks. A comprehensive risk-based approach for identifying the probability and consequences of potential concerns was presented for a sample wind energy project. The process determined objectives in relation to the project's net present value. Contributing domains included the energy production, prices, and operating costs of the project. Decision criteria used to evaluate the desirability of the wind project were then developed. Monte Carlo simulations were the used to aggregate individual risks into an overall total. The contribution of each element to the decision objective was calculated separately. The element outputs were than combined into a measure of aggregate risk exposure. Aggregate results were used to calculate the decision criteria. The decision objective was to determine if the energy cost was less than the avoided cost of other project options. The study showed that the approach can allow decision-makers to mitigate risks. However, the results are dependent on the quality of the input data. tabs., figs.

  12. The analysis of financial risk management application for NPP project in Indonesia

    International Nuclear Information System (INIS)

    Imam Bastori; Moch Djoko Birmano

    2012-01-01

    NPP Project is one of full dynamic, risky and challenging business. Application of financial risk management t in Nuclear Power Plant (NPP) project becomes one alternative to be considered carefully. This paper explains an analysis to make a decision in the risk management application so that it can be applied in the NPP's construction in Indonesia. As case study, is NPP of conventional PWR type of class 1150 MWe. To calculate the economics and financing of NPP is used Spreadsheet INOVASI, further the decision of financial risk management were analyzed using a Model of Cash Flow Adjustment, which developed by Richard Fairchild. The analysis showed that the Method of Cash Flow Adjustment developed by Richard Fairchild is better than the method of NPV Adjustment on a NPP project, because it have included the aspects of financial risk management. NPP project can only be executed if the NPV 2 0 and decision to execute the financial risk management should be based on NPVrm > NPV. The application of financial risk management in NPP project is not needed if an insurance premium more expensive than all costs of financial distress, unless the insurance company can give discount of at least 20%. (author)

  13. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    Science.gov (United States)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  14. Projection of radiation-induced cancer risks across time and populations

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1991-01-01

    Various methods can be used to project the risks of radiation-induced cancer estimated in cohort studies beyond the period of follow-up and to other populations. The choice of risk projection model is reviewed based on data from studies such as those of the Japanese atomic bomb survivors and UK ankylosing spondylitis patients given X ray therapy. Risk estimates applicable to a UK population are calculated on the basis of various models, including those developed by the BEIR V Committee. It is emphasised that the continued follow-up of populations such as the Japanese atomic bomb survivors is of great importance in estimating lifetime risks. (author)

  15. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  16. Risk reduction of international mining projects by means of investor consortia and diversification of external financing

    International Nuclear Information System (INIS)

    Kirchner, C.

    1982-01-01

    Investors and creditors of international mining projects bear specific risks which may be reduced by means of forming investor and financing consortia. Risk is defined for each actor separately. Project risk and investor risk respectively credit risk are useful categories in order to analyze risk reduction. In each case formation of consortia has a positive influence on the economic viability of the project, and thus reduces the project risk. Furthermore, formation of consortia leads to better compliance of the host country of the mining project with the project and financing agreements. Thus, investor and credit risk may be reduced. (orig.) [de

  17. Planning risk communication for UMTRA project groundwater restoration

    Energy Technology Data Exchange (ETDEWEB)

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  18. Planning risk communication for UMTRA project groundwater restoration

    International Nuclear Information System (INIS)

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  19. Risk assessment of underpass infrastructure project based on IS0 31000 and ISO 21500 using fishbone diagram and RFMEA (project risk failure mode and effects analysis) method

    Science.gov (United States)

    Purwanggono, Bambang; Margarette, Anastasia

    2017-12-01

    Completion time of highway construction is very meaningful for smooth transportation, moreover expected number of ownership motor vehicle will increase each year. Therefore, this study was conducted with to analyze the constraints that contained in an infrastructure development project. This research was conducted on Jatingaleh Underpass Project, Semarang. This research was carried out while the project is running, on the implementation, this project is experiencing delays. This research is done to find out what are the constraints that occur in execution of a road infrastructure project, in particular that causes delays. The method that used to find the root cause is fishbone diagram to obtain a possible means of mitigation. Coupled with the RFMEA method used to determine the critical risks that must be addressed immediately on road infrastructure project. The result of data tabulation in this study indicates that the most possible mitigation tool to make a Standard Operating Procedure (SOP) recommendations to disrupt utilities that interfere project implementation. Process of risk assessment has been carried out systematically based on ISO 31000:2009 on risk management and for determination of delayed variables, the requirements of process groups according to ISO 21500:2013 on project management were used.

  20. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  1. A Quantitative Measure For Evaluating Project Uncertainty Under Variation And Risk Effects

    Directory of Open Access Journals (Sweden)

    A. Chenarani

    2017-10-01

    Full Text Available The effects of uncertainty on a project and the risk event as the consequence of uncertainty are analyzed. The uncertainty index is proposed as a quantitative measure for evaluating the uncertainty of a project. This is done by employing entropy as the indicator of system disorder and lack of information. By employing this index, the uncertainty of each activity and its increase due to risk effects as well as project uncertainty changes as a function of time can be assessed. The results are implemented and analyzed for a small turbojet engine development project as the case study. The results of this study can be useful for project managers and other stakeholders for selecting the most effective risk management and uncertainty controlling method.

  2. RISK ASSESSMENT IN PROJECT PLANNING USING FMEA AND CRITICAL PATH METHOD

    Directory of Open Access Journals (Sweden)

    Sandra Milena CHOLES ARVILLA

    2014-10-01

    Full Text Available This paper is based upon the research undertaken for the development of the doctoral thesis “Management of software projects based on object-oriented technology”. The study examines the existing risk management practices commonly used for classic software development. The goal is to integrate the elements of the traditional risk management methodologies to create a new agile risk management methodology. The thesis focuses on techniques that can be easily implemented in extreme programming (XP and SCRUM. This study is motivated by the following research questions: What are the elements of existing quality assurance tools that could meet the principles of agile development? And is it possible to use risk estimation for improving quality in agile projects? The thesis presents a synthesis of the most common risk management techniques, as well as an introduction to agile methods XP and SCRUM. The proposal integrates the concepts of Failure Mode and Effect Analysis into the iterative life cycle of an agile software project. The thesis presents a metamodel which integrates the concepts of agile development methodologies: SCRUM and XP with the FMEA concepts for risk quantification. The model was partly implemented into a real development project. Partial results show the improvement in early identification of failures and allowed to reconsider the Sprint plan.

  3. Risk management for engineering projects procedures, methods and tools

    CERN Document Server

    Munier, Nolberto

    2014-01-01

    Many people see risk in engineering projects as an imprecise and nebulous problem - something that exists, is feared and is impossible to deal with. Nothing could be further from the truth. While risk is certainly ubiquitous, sometimes difficult to detect, and cannot always be completely avoided, it can generally be mitigated, reduced or prevented through timely analysis and action.   This book covers the entire process of risk management by providing methodologies for determining the sources of project risk, and once threats have been identified, managing them through:   ·         identification and assessment (probability, relative importance, variables, risk breakdown structure, etc.) ·         implementation of measures for their prevention, reduction or mitigation ·         evaluation of impacts and quantification of risks ·         establishment of control measures   It also considers sensitivity analysis to determine the influence of uncertain parameters values ...

  4. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  5. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  6. Perceived risks in product innovation projects : development of a risk skeleton

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.; Song, X.M.

    1999-01-01

    The essence of undertaking a product innovation project is to create or establish something new. Risk taking is an intrinsic part of that process. In today's markets, with heavy competition, advanced technology and tough economic conditions, successful product innovation has become critically

  7. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  8. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  9. Capital Finance Decisions for project managers - A reflection on current methods

    Directory of Open Access Journals (Sweden)

    C. Scheepers

    2003-12-01

    Full Text Available This paper evaluates some of current financial investment selection methodologies for capital projects. The proc ess (and criteria of capital investment decisions is reviewed. The capital budget for most organisations is prepared annually by a committee of senior managers who then present it for approval by the board of directors. Investment proposals are usually subjected to two financial tests, "payback" and "internal rate of return (IRR". The management committee usually decides on the tests and acceptance criteria vary according to the type of project. Some shortcomings of these most frequently used current tests (Payback & IRR are identified and it is recommended that the Net Present Value (NPV should be used as the primary method for analysing, comparing and selecting capital projects.

  10. Risks Associated with Unconventional Gas Extraction Projects. Induced Seismicity, NORM and Ecological Risks

    International Nuclear Information System (INIS)

    Rodrigo-Naharro, J.; Hurtado, A.; Eguilior, S.; Recreo, F.

    2015-01-01

    The latest technological advances in hydraulic fracturing (fracking) and horizontal drilling are globally driving the commercial extraction of unconventional resources. Although there is still no commercial exploitation of these resources within the EU, the fact that there are potential reserves in some countries, such as Spain, stimulates the need of performing preliminary studies to define the characteristics that an unconventional gas extraction project should consider. The object of these features are the safety of the project, thus minimizing the probabilities of negative environmental impacts, and especially since there is not any EU Framework Directive focusing on the regulation of the operation of such fossil fuels. A project of this nature, involving natural systems, must start from the knowledge of these systems and from an assessment of its features in order to reach the environmental safety of the operations. Moreover, the implementation of risk management systems, along with the existence of an appropriate legislation and supervision are key elements in the development of unconventional gas extraction projects that are environmentally friendly. The present report includes, among the overall risks associated with such projects, those related to: i) the induced seismicity; ii) the Naturally-Occurring Radioactive Materials (NORM); and iii) the ecology.

  11. RISK MANAGEMENT AUTOMATION OF SOFTWARE PROJECTS BASED ОN FUZZY INFERENCE

    Directory of Open Access Journals (Sweden)

    T. M. Zubkova

    2015-09-01

    Full Text Available Application suitability for one of the intelligent methods for risk management of software projects has been shown based on the review of existing algorithms for fuzzy inference in the field of applied problems. Information sources in the management of software projects are analyzed; major and minor risks are highlighted. The most critical parameters have been singled out giving the possibility to estimate the occurrence of an adverse situations (project duration, the frequency of customer’s requirements changing, work deadlines, experience of developers’ participation in such projects and others.. The method of qualitative fuzzy description based on fuzzy logic has been developed for analysis of these parameters. Evaluation of possible situations and knowledge base formation rely on a survey of experts. The main limitations of existing automated systems have been identified in relation to their applicability to risk management in the software design. Theoretical research set the stage for software system that makes it possible to automate the risk management process for software projects. The developed software system automates the process of fuzzy inference in the following stages: rule base formation of the fuzzy inference systems, fuzzification of input variables, aggregation of sub-conditions, activation and accumulation of conclusions for fuzzy production rules, variables defuzzification. The result of risk management automation process in the software design is their quantitative and qualitative assessment and expert advice for their minimization. Practical significance of the work lies in the fact that implementation of the developed automated system gives the possibility for performance improvement of software projects.

  12. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  13. The Fee Sensitive Risk Exposures of Project Authorized Person in Hong Kong

    Directory of Open Access Journals (Sweden)

    Sai-On Cheung

    2012-11-01

    Full Text Available Authorized Persons (AP play a critical role in the design and construction of building works in Hong Kong. Under the Building Ordinance, design and construction of building works need to be coordinated and monitored by an AP registered with the Buildings Department. Professionally qualified Architects, Engineers and Surveyors are eligible to register as AP after completing the prescribed assessment. In addition, the project AP is often appointed by the project owner to be the project team leader. In these capacities, a project AP is exposed to various risks. This paper seeks to identify the fee sensitive risk exposures of project APs. Through an ANOVA study, these risks exposures are those due to liabilities under the Building Ordinance at the construction stage, those towards the third parties and the clients.

  14. Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314

  15. Accuracy of hazardous waste project estimates

    International Nuclear Information System (INIS)

    Hackney, J.W.

    1989-01-01

    The HAZRATE system has been developed to appraise the current state of definition of hazardous waste remedial projects. This is shown to have a high degree of correlation to the financial risk of such projects. The method employs a weighted checklist indicating the current degree of definition of some 150 significant project elements. It is based on the author's experience with a similar system for establishing the risk characteristics of process plant projects (Hackney, 1965 and 1989; 1985). In this paper definition ratings for 15 hazardous waste remedial projects have been correlated with the excesses of their actual costs over their base estimates, excluding any allowances for contingencies. Equations are presented, based on this study, for computation of the contingency allowance needed and estimate accuracy possible at a given stage of project development

  16. Preventable coronary heart disease events from control of cardiovascular risk factors in US adults with diabetes (projections from utilizing the UKPDS risk engine).

    Science.gov (United States)

    Wong, Nathan D; Patao, Christopher; Malik, Shaista; Iloeje, Uchenna

    2014-04-15

    Type 2 diabetes mellitus (T2DM) carries significant risks for coronary heart disease (CHD). We examined the potential US population impact of single and composite risk factor control. Among US adults with diagnosed T2DM aged≥30 years in the National Health and Nutrition Examination Survey 2007 to 2012, we assessed CHD events preventable using the United Kingdom Prospective Diabetes Study CHD risk engine. We examined in all those not at goal the impact of statistical control of smoking, glycated hemoglobin, systolic blood pressure, and total and high-density lipoprotein cholesterol, according to the predefined criteria setting risk factors at different levels of control representing (1) "All to Goal," (2) at "Nominal Control," or (3) at "Aggressive Control." Preventable CHD events represented the difference between the number of events estimated from the control of these risk factors versus current levels of the risk factors. Of 606 men (representing 6.2 million) and 603 women (6.3 million) with DM and no previous CHD, 1.3 million men and 0.7 million women would develop a CHD event within 10 years if left uncontrolled. Controlling all risk factors to goal was projected to prevent 35% and 45% of CHD events in men and women, respectively. Nominal risk factor control was projected to prevent 36% and 38% and aggressive control 51% and 61% of CHD events, respectively. In conclusion, a significant proportion of CHD events in adults with T2DM could be prevented from composite control of risk factors often not at goal. Copyright © 2014 Elsevier Inc. All rights reserved.

  17. Decision Model on Financing a Project Using Knowledge about Risk Areas

    OpenAIRE

    Ioana POPOVICI; Emil SCARLAT; Francesco RIZZO

    2011-01-01

    The research presents an alternative to the classical method of measuring financial risk in funding a project. The goal of the model described in the paper implies identifying "risky areas" within the financial balance of the project. The model analysis the financial risk behavior studied along four scenarios by varying only the cost of financing source used according to the specific type of funding. The model introduces the time factor into the analysis of financial risk due to the specific ...

  18. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  19. Risk management of PPP project in the preparation stage based on Fault Tree Analysis

    Science.gov (United States)

    Xing, Yuanzhi; Guan, Qiuling

    2017-03-01

    The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.

  20. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  1. Derivatives in energy project finance

    International Nuclear Information System (INIS)

    Spencer, Lloyd

    1999-01-01

    This chapter focuses on risk management of merchant power generation projects and describes project finance as balancing risk and reward over time. The historical background to risk management is traced, and the case for derivatives in energy project finance is put forward with the hedging of forward output, and forwards and power purchase agreements discussed. Current and prospective usage, and the implementation issues of market liquidity, margin calls, letters of credit, derivative counterparty credit risk, and accounting policy are considered. A detailed example of a gas-fired plant in the US is presented with details given of the distribution of project earnings before tax. Oil field operating cashflows are examined, with reserved flow models, leverage effects, and price hedging addressed

  2. Evaluating Sources of Risks in Large Engineering Projects: The Roles of Equivocality and Uncertainty

    Directory of Open Access Journals (Sweden)

    Leena Pekkinen

    2015-11-01

    Full Text Available Contemporary project risk management literature introduces uncertainty, i.e., the lack of information, as a fundamental basis of project risks. In this study the authors assert that equivocality, i.e., the existence of multiple and conflicting interpretations, can also serve as a basis of risks. With an in-depth empirical investigation of a large complex engineering project the authors identified risk sources having their bases in the situations where uncertainty or equivocality was the predominant attribute. The information processing theory proposes different managerial practices for risk management based on the sources of risks in uncertainty or equivocality.

  3. Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

    OpenAIRE

    O. Badagadze; G. Sirbiladze; I. Khutsishvili

    2014-01-01

    The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

  4. Risks and opportunities management on laser Megajoule project: the development of a new knowledge

    International Nuclear Information System (INIS)

    Delafosse-Le Ber, H.; Deysson, St.; Briault, S.

    2004-01-01

    The interest of these six years spent to build the management through the Risks and the Opportunities (R and O) approach on the project Megajoule Laser as well did not hold with the practical application of a method as to the installation of a formal culture and to its evolution in time. This culture, it had to be progressively founded within a mainly technical project team. More qualitative with most quantitative aspects, the putting into practice of the R and O approach on project LMJ knew all the degrees of evolution and precision. The starting of the project saw being born the first analysis of its 'Project Risk' with a series of interviews, carried out by the Quality Manager at the time. This analysis took the shape of a technical item lists, which are identified in an empirical way. Then, some brainstorming meeting were led under the responsibility of the Technical Coordinator (which is the Project Manager assistant) in order to identify and to evaluate the 'Project Risk' on a qualitative way, but always keeping a strong technical connotation. The methodological reference of the 'Project Risk' was outlined taking into account the DGA AQ 923 without directly interaction with the other project processes (for example, the cost, the deadlines and the performance management). Initially, the project developed an Access database, which allows the storing of the risk files. Unfortunately, this database is isolated from the other project management data processing tools. In the second time, the project decided to obtain a dedicated organisation, hierarchically independent from the technical managers but however integrated into the project and attached to the assistant of the Control Project Manager. This organisation being called 'Risks and Opportunities Team', when the management of the opportunities supplemented the R and O approach. This team combines today the individual interviews and the Working Groups in order to identify and to evaluate the effects of the R

  5. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    International Nuclear Information System (INIS)

    Klos, Richard; Wilmot, Roger

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference between

  6. Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Daniels Jeffrey I.,Chapman Jenny B.

    2012-01-01

    The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8,400 ft in the Williams Fork Formation of the Piceance Basin, west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward of the site. Their management is guided by data collected from past site investigations and current monitoring, and by the results of calculations of expected behavior of contaminants remaining in the deep subsurface. The purpose of this screening risk assessment is to evaluate possible health risks from current and future exposure to Rulison contaminants so the information can be factored into LM's stewardship decisions. For example, these risk assessment results can inform decisions regarding institutional controls at the site and appropriate monitoring of nearby natural-gas extraction activities. Specifically, the screening risk analysis can provide guidance for setting appropriate action levels for contaminant monitoring to ensure protection of human health.

  7. Screening Assessment of Potential Human-Health Risk from Future Natural-Gas Drilling Near Project Rulison in Western Colorado

    International Nuclear Information System (INIS)

    Daniels, Jeffrey I.; Chapman, Jenny B.

    2012-01-01

    The Project Rulison underground nuclear test was conducted in 1969 at a depth of 8,400 ft in the Williams Fork Formation of the Piceance Basin, west-central Colorado (Figure 1). The U.S. Department of Energy Office of Legacy Management (LM) is the steward of the site. Their management is guided by data collected from past site investigations and current monitoring, and by the results of calculations of expected behavior of contaminants remaining in the deep subsurface. The purpose of this screening risk assessment is to evaluate possible health risks from current and future exposure to Rulison contaminants so the information can be factored into LM's stewardship decisions. For example, these risk assessment results can inform decisions regarding institutional controls at the site and appropriate monitoring of nearby natural-gas extraction activities. Specifically, the screening risk analysis can provide guidance for setting appropriate action levels for contaminant monitoring to ensure protection of human health.

  8. Relationships Between Risks in an IT Project Development Portfolio

    NARCIS (Netherlands)

    Kusters, R.J.; Postema, J.J.; Trienekens, J.J.M.; Lavazza, L.; Oberhauser, R.; Martin, A.; Hassine, J.; Gebhart, M.; Jäntti, M.

    2013-01-01

    More and more it is seen that IT (Information Technology) projects are managed as a whole as part of a IT project portfolio. As one of the arguments for doing so, risk management at the portfolio level was identified as one of the advantages that could benefit from this. This was based on the notion

  9. Review of the current status of radiation risk estimates

    International Nuclear Information System (INIS)

    Charles, M.W.; Little, M.P.

    1988-10-01

    This report reviews the current status of radiation risk estimation for low linear energy transfer radiation. Recent statements by various national and international organisations regarding risk estimates are critically discussed. The recently published revised population risk estimates from the study of Japanese bomb survivors are also reviewed and used with some unpublished data from Japan to calculate risk figures for a general work force. (author)

  10. MANAGEMENT OF TRANSURANIC (TRU) WASTE RETRIEVAL PROJECT RISKS SUCCESSES IN THE STARTUP OF THE HANFORD 200 AREA TRU WASTE RETRIEVAL PROJECT

    International Nuclear Information System (INIS)

    GREENWLL, R.D.

    2005-01-01

    A risk identification and mitigation method applied to the Transuranic (TRU) Waste Retrieval Project performed at the Hanford 200 Area burial grounds is described. Retrieval operations are analyzed using process flow diagramming. and the anticipated project contingencies are included in the Authorization Basis and operational plans. Examples of uncertainties assessed include degraded container integrity, bulged drums, unknown containers, and releases to the environment. Identification and mitigation of project risks contributed to the safe retrieval of over 1700 cubic meters of waste without significant work stoppage and below the targeted cost per cubic meter retrieved. This paper will be of interest to managers, project engineers, regulators, and others who are responsible for successful performance of waste retrieval and other projects with high safety and performance risks

  11. Development of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

    Science.gov (United States)

    Kim, Myung-Hee; Hu, Shaowen; Nounu, Hatem N.; Cucinotta, Francis A.

    2010-01-01

    The space radiation environment, particularly solar particle events (SPEs), poses the risk of acute radiation sickness (ARS) to humans; and organ doses from SPE exposure may reach critical levels during extra vehicular activities (EVAs) or within lightly shielded spacecraft. NASA has developed an organ dose projection model using the BRYNTRN with SUMDOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUMDOSE, written in FORTRAN, are a Baryon transport code and an output data processing code, respectively. The ARR code is written in C. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. BRYNTRN code operation requires extensive input preparation. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN in friendly way. A GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. The ARRBOD GUI will serve as a proof-of-concept example for future integration of other human space applications risk projection models. The current version of the ARRBOD GUI is a new self-contained product and will have follow-on versions, as options are added: 1) human geometries of MAX/FAX in addition to CAM/CAF; 2) shielding distributions for spacecraft, Mars surface and atmosphere; 3) various space environmental and biophysical models; and 4) other response models to be connected to the BRYNTRN. The major components of the overall system, the subsystem interconnections, and external interfaces are described in this

  12. Risk Management Affecting IS/IT Project Success Through Communicative Action

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    Project risk management is defined in the literature as being instrumental action based on rational problem solving. Research indicates limited positive effects of an exclusive focus of instrumental action on project success. This article proposes to extend this instrumental view through

  13. Improving Flood Risk Maps as a Capacity Building Activity: Fostering Public Participation and Raising Flood Risk Awareness in the German Mulde Region (project RISK MAP)

    Science.gov (United States)

    Luther, J.; Meyer, V.; Kuhlicke, C.; Scheuer, S.; Unnerstall, H.

    2012-04-01

    The EU Floods Directive requires the establishment of flood risk maps for high risk areas in all EU Member States by 2013. However, if existing at all, the current practice of risk mapping still shows some deficits: Risk maps are often seen as an information tool rather than a communication tool. This means that e.g. important local knowledge is not incorporated and forms a contrast to the understanding of capacity building which calls for engaging individuals in the process of learning and adapting to change and for the establishment of a more interactive public administration that learns equally from its actions and from the feedback it receives. Furthermore, the contents of risk maps often do not match the requirements of the end users, so that risk maps are often designed and visualised in a way which cannot be easily understood by laypersons and/or which is not suitable for the respective needs of public authorities in risk and flood event management. The project RISK MAP aimed at improving flood risk maps as a means to foster public participation and raising flood risk awareness. For achieving this aim, RISK MAP (1) developed rules for appropriate stakeholder participation enabling the incorporation of local knowledge and preferences; (2) improved the content of risk maps by considering different risk criteria through the use of a deliberative multicriteria risk mapping tool; and (3) improved the visualisation of risk maps in order to produce user-friendly risk maps by applying the experimental graphic semiology (EGS) method that uses the eye tracking approach. The research was carried out in five European case studies where the status quo of risk mapping and the legal framework was analysed, several stakeholder interviews and workshops were conducted, the visual perception of risk maps was tested and - based on this empirical work - exemplary improved risk maps were produced. The presentation and paper will outline the main findings of the project which

  14. Risk management in a large-scale CO2 geosequestration pilot project, Illinois, USA

    Science.gov (United States)

    Hnottavange-Telleen, K.; Chabora, E.; Finley, R.J.; Greenberg, S.E.; Marsteller, S.

    2011-01-01

    Like most large-scale infrastructure projects, carbon dioxide (CO 2) geological sequestration (GS) projects have multiple success criteria and multiple stakeholders. In this context "risk evaluation" encompasses multiple scales. Yet a risk management program aims to maximize the chance of project success by assessing, monitoring, minimizing all risks in a consistent framework. The 150,000-km2 Illinois Basin underlies much of the state of Illinois, USA, and parts of adjacent Kentucky and Indiana. Its potential for CO2 storage is first-rate among basins in North America, an impression that has been strengthened by early testing of the injection well of the Midwest Geological Sequestration Consortium's (MGSC's) Phase III large scale demonstration project, the Illinois Basin - Decatur Project (IBDP). The IBDP, funded by the U.S. Department of Energy's National Energy Technology Laboratory (NETL), represents a key trial of GS technologies and project-management techniques. Though risks are specific to each site and project, IBDP risk management methodologies provide valuable experience for future GS projects. IBDP views risk as the potential for negative impact to any of these five values: health and safety, environment, financial, advancing the viability and public acceptability of a GS industry, and research. Research goals include monitoring one million metric tonnes of injected CO2 in the subsurface. Risk management responds to the ways in which any values are at risk: for example, monitoring is designed to reduce uncertainties in parameter values that are important for research and system control, and is also designed to provide public assurance. Identified risks are the primary basis for risk-reduction measures: risks linked to uncertainty in geologic parameters guide further characterization work and guide simulations applied to performance evaluation. Formally, industry defines risk (more precisely risk criticality) as the product L*S, the Likelihood multiplied

  15. 基于风险矩阵的BOT-TOT-PPP项目融资风险评估%The Risk Assessment of BOT-TOT-PPP Project Financing Based on Risk Matrix

    Institute of Scientific and Technical Information of China (English)

    李力

    2012-01-01

    风险评估在BOT-TOT-PPP项目中至关重要。本文通过大量案例调研指出,现阶段BOT-TOT-PPP项目融资的风险因素来源于项目外部的政治、经济、文化、社会(环保)以及内部的合同制订、工程技术能力、管理能力和投融资能力方面。风险矩阵和Borda序值对风险的量化评估表明,此类项目现阶段的关键风险集中在政府项目融资管理的专业化水平较低、合同双方对关键指标的确定不合理、投融资管理和工程实施存在问题等方面。%Risk assessment is paramount in BOT-TOT-PPP project.It is indicated through a great deal of cases that risk factors of BOT-TOT-PPP project financing currently derive from politics,economy,culture,society(environmental protection) beyond project,and contract establishment,engineering technology ability,management ability,investment financing ability within project.Quantitative evaluation of risk matrix and Borda counting on risk shows that today major risk of such project concentrates on low management level of governmental project financing,irrational key index in mutual contract,problems involved in financing management and engineering implementation.

  16. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  17. Implications of commodity price risk and operating leverage on petroleum project economic evaluations

    International Nuclear Information System (INIS)

    Salahor, G.; Laughton, D.G.

    1999-01-01

    The modern asset pricing method, MAP, can provide businesses with improved tools for economic analysis. This in turn leads to greater precision in the analysis of the effects of the following parameters: project structure, time, and uncertainty. This greater precision with MAP extends to analysis of the possibility for active control of the decision alternatives for managers in the petroleum business, especially where this possibility is not questioned. A methodology is developed as a model that quantifies revenue risk based on the nature of commodity price volatility and the accepted price of risk in the commodity market. A mathematical description is included of a natural gas log-normal distribution incorporating the annual volatility in the forecast, and a measure of the rate at which volatility decreases in the long run in the forecast. Give this volatility model, a risk discount factor is determinable and applicable to the current expectation of the commodity prices at a given time, and a discount time factor of all parts of the cash flow stream. Cases are used to evaluate a natural gas development project for the purpose of yielding scenarios for capital vs. operating cost trade-offs, price risk management, production profile, and the effect of the reverting vs. non-reverting price model. In application one, a comparison is made of discounted cash flow (DCF) to MAP evaluations giving a perspective on the various development choices which a producer has through third-party service providers. Further, an example is used to compare the two methods as alternative evaluations of development alternatives to speed up or slow down the production rate and decline profile of a gas field. As in the first example, the DCF discounting is higher than the net discounting in the MAP evaluation. But in this example both methods produce the same project structure decision. The small amount of incremental capital and operating costs needed for the higher production case are

  18. MARR project risk matrices in radiotherapy; Proyecto MARR: matrices de riesgo en radioterapia

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez, M. L.; Perez Mulas, A.; Vilanova, J.; Prieto, C.; Delgado, J. M.; Alvarez, C.; Rodriguez, M.

    2014-07-01

    Radiotherapy is a complex process not without risk for the patient. The Council de Nuclear Safety (CSN), based on its cooperation with the health authorities regarding radiation protection of patient is promoting, through the project MARR, (Risk matrix in radiotherapy) the risk analysis in the radiotherapy departments of our country. This project represents the extension of methodologies applied in the nuclear sector other radiological practices. The aim is to share, with professional societies, the knowledge acquired by the CSN during its participation in the Ibero-American Forum of regulators (Forum) projects. (Author)

  19. Risks of ocean acidification in the California Current food web and fisheries: ecosystem model projections.

    Science.gov (United States)

    Marshall, Kristin N; Kaplan, Isaac C; Hodgson, Emma E; Hermann, Albert; Busch, D Shallin; McElhany, Paul; Essington, Timothy E; Harvey, Chris J; Fulton, Elizabeth A

    2017-04-01

    The benefits and ecosystem services that humans derive from the oceans are threatened by numerous global change stressors, one of which is ocean acidification. Here, we describe the effects of ocean acidification on an upwelling system that already experiences inherently low pH conditions, the California Current. We used an end-to-end ecosystem model (Atlantis), forced by downscaled global climate models and informed by a meta-analysis of the pH sensitivities of local taxa, to investigate the direct and indirect effects of future pH on biomass and fisheries revenues. Our model projects a 0.2-unit drop in pH during the summer upwelling season from 2013 to 2063, which results in wide-ranging magnitudes of effects across guilds and functional groups. The most dramatic direct effects of future pH may be expected on epibenthic invertebrates (crabs, shrimps, benthic grazers, benthic detritivores, bivalves), and strong indirect effects expected on some demersal fish, sharks, and epibenthic invertebrates (Dungeness crab) because they consume species known to be sensitive to changing pH. The model's pelagic community, including marine mammals and seabirds, was much less influenced by future pH. Some functional groups were less affected to changing pH in the model than might be expected from experimental studies in the empirical literature due to high population productivity (e.g., copepods, pteropods). Model results suggest strong effects of reduced pH on nearshore state-managed invertebrate fisheries, but modest effects on the groundfish fishery because individual groundfish species exhibited diverse responses to changing pH. Our results provide a set of projections that generally support and build upon previous findings and set the stage for hypotheses to guide future modeling and experimental analysis on the effects of OA on marine ecosystems and fisheries. © 2017 John Wiley & Sons Ltd.

  20. Consortium for Offshore Aviation Research : description of current projects

    International Nuclear Information System (INIS)

    Anon.

    1998-01-01

    The five projects which are currently underway or being evaluated through the Consortium for Offshore Aviation Research (COAR) were described. The projects are: (1) the use of narrow-beam, high intensity searchlights as approach aids for helicopter landings on helidecks in low visibility conditions, (2) establishment of a precipitation and fog characterization facility forecasting, (3) use of ice-phobic materials for airframe anti-icing, (4) use of differential global positioning satellite systems for offshore operations, and (5) the development of a virtual reality head-up-display for the approach to the Hibernia helideck (or any other helideck) to facilitate low visibility landings. Seed funding for these projects has been provided by the European Space Agency. Additional support is being provided by Hibernia, Petro-Canada, Husky Oil and Chevron Oil Canada. Initiatives to increase the number of partners are underway. 1 fig

  1. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  2. Methodology evaluation of innovative projects under risk and uncertainty

    Directory of Open Access Journals (Sweden)

    2012-09-01

    Full Text Available This article deals with problems connected with the assessment of innovative projects in the context of risk and uncertainty, topical issues of evaluation of innovative projects at the present stage of development of the Russian economy. By the example of the solution of the "crossing the river" is considering the possibility of using hierarchical models to address it. In what follows, and compares the priorities of different groups of factors are given by calculating the overall costs and benefits. The paper provides a rationale for combined use of four aspects: the beneficial aspects of the decision (the benefits and opportunities and negative (costs and risks that may lead to the decision in question.

  3. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  4. Current status of RCA projects and strategies for future implementation

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Lee, Jeong Kong

    1998-12-01

    This report is intended to provide basic overall information about ways to promote technical cooperation within the framework of RCA to accelerate and coordinate cooperative activities in nuclear science and technology in Asia and the Pacific region through a thorough review on the current status and through suggesting future implementation strategies. The contents of this report include an overall introduction of RCA, guidelines and operating rules for RCA programmes, current status and future plans for RCA projects as well as the RCA vision for the next 25 years. By reviewing the current status and future implementation strategies for RCA projects, it will help to set up a national nuclear policy aimed at seeking maximum benefits from participation in RCA projects and to implement programmes for nuclear cooperation with Asian-Pacific countries. It is expected that as a lead country for the energy sector, which is one of five thematic areas for the year 1999 - 2000 cycle programmes, Korea will continue to make significant contributions towards the implementation of RCA programmes in the future. With this report, we plan to keep up with future developments as well as implement an effective cooperation with the countries in the region so that the opinion of Korea, one of the nuclear advanced countries in the region, can be fully reflected in the establishment of future plans for RCA programmes. (author). 3 refs., 5 tabs., 1 fig

  5. Supporting Current Energy Conversion Projects through Numerical Modeling

    Science.gov (United States)

    James, S. C.; Roberts, J.

    2016-02-01

    The primary goals of current energy conversion (CEC) technology being developed today are to optimize energy output and minimize environmental impact. CEC turbines generate energy from tidal and current systems and create wakes that interact with turbines located downstream of a device. The placement of devices can greatly influence power generation and structural reliability. CECs can also alter the environment surrounding the turbines, such as flow regimes, sediment dynamics, and water quality. These alterations pose potential stressors to numerous environmental receptors. Software is needed to investigate specific CEC sites to simulate power generation and hydrodynamic responses of a flow through a CEC turbine array so that these potential impacts can be evaluated. Moreover, this software can be used to optimize array layouts that yield the least changes to the environmental (i.e., hydrodynamics, sediment dynamics, and water quality). Through model calibration exercises, simulated wake profiles and turbulence intensities compare favorably to the experimental data and demonstrate the utility and accuracy of a fast-running tool for future siting and analysis of CEC arrays in complex domains. The Delft3D modeling tool facilitates siting of CEC projects through optimization of array layouts and evaluation of potential environmental effect all while provide a common "language" for academics, industry, and regulators to be able to discuss the implications of marine renewable energy projects. Given the enormity of any full-scale marine renewable energy project, it necessarily falls to modeling to evaluate how array operations must be addressed in an environmental impact statement in a way that engenders confidence in the assessment of the CEC array to minimize environmental effects.

  6. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  7. Integrating knowledge for managing risk in infrastructure projects : the case of tunnel works

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen

    2012-01-01

    The objective of traditional approaches to project risk management is to identify risks that can lead to project failure and to implement effective strategies to manage them. Information on the relevant causes and conditions in which failures arise is usually required as necessary input for

  8. Modelling projections for the risks related with atrial fibrillation in East Asia

    DEFF Research Database (Denmark)

    Bai, Ying; Guo, Shi-Dong; Shantsila, Alena

    2017-01-01

    Aims: In the Far East, there has generally been low uptake of oral anticoagulants (OACs) using vitamin K antagonists (VKA, e.g. warfarin) for stroke prevention in atrial fibrillation (AF), but OAC use has been increasing more recently, with the introduction of the non-vitamin K antagonist oral...... anticoagulants (NOACs). To explore the risks of ischaemic stroke (IS) and death related to AF in East Asia using modelling projections. Methods and results: We performed a modelling analysis of possible trends of IS and death rates in AF patients from the time period of only VKA use to current increasing trends....... There was an estimated annual risk reduction of 5484 ISs and 1128 deaths from 2016 to 2030, respectively. The AF population is estimated to reach 861 900 in 2050, with a reduction of 206 315 ISs and 139 353 deaths. Conclusion: This modelling analysis suggests that the transition from VKA to NOACs may greatly help...

  9. Health risk assessment for a MWC ash utilization demonstration project

    International Nuclear Information System (INIS)

    Roffman, H.K.

    1992-01-01

    A Health Risk Assessment (HRA) was conducted for the proposed joint Hennepin County/Municipal Services Corporation (MSC) MSW Ash Utilization Demonstration Project, in which combined HERC ash was shipped to the MSC Pilot Plan near Atlanta, Georgia and used in the production of a synthetic aggregate. The synthetic aggregate, or TAP, will serve as a partial replacement for natural aggregates in a section of bituminous pavement that is proposed to be constructed on Pioneer Trail in the City of Corcoran, Minnesota. In this paper, the assessment compares the following three scenarios: a section of roadway paved using the MSC synthetic aggregate product (TAP) as a replacement for 30 percent of the natural aggregates used in bituminous pavement; a section of regular bituminous (asphalt) pavement; and a section of unpaved road currently in place at the site

  10. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    Directory of Open Access Journals (Sweden)

    Voytolovskiy Nikolay

    2017-01-01

    Full Text Available This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment project risks were specified on the basis of interconnection of risk and project effectiveness. Risk management procedure at realization of the developer project was developed.

  11. Engineering risk assessment for emergency disposal projects of sudden water pollution incidents.

    Science.gov (United States)

    Shi, Bin; Jiang, Jiping; Liu, Rentao; Khan, Afed Ullah; Wang, Peng

    2017-06-01

    Without an engineering risk assessment for emergency disposal in response to sudden water pollution incidents, responders are prone to be challenged during emergency decision making. To address this gap, the concept and framework of emergency disposal engineering risks are reported in this paper. The proposed risk index system covers three stages consistent with the progress of an emergency disposal project. Fuzzy fault tree analysis (FFTA), a logical and diagrammatic method, was developed to evaluate the potential failure during the process of emergency disposal. The probability of basic events and their combination, which caused the failure of an emergency disposal project, were calculated based on the case of an emergency disposal project of an aniline pollution incident in the Zhuozhang River, Changzhi, China, in 2014. The critical events that can cause the occurrence of a top event (TE) were identified according to their contribution. Finally, advices on how to take measures using limited resources to prevent the failure of a TE are given according to the quantified results of risk magnitude. The proposed approach could be a potential useful safeguard for the implementation of an emergency disposal project during the process of emergency response.

  12. Deep Uncertainty Surrounding Coastal Flood Risk Projections: A Case Study for New Orleans

    Science.gov (United States)

    Wong, Tony E.; Keller, Klaus

    2017-10-01

    Future sea-level rise drives severe risks for many coastal communities. Strategies to manage these risks hinge on a sound characterization of the uncertainties. For example, recent studies suggest that large fractions of the Antarctic ice sheet (AIS) may rapidly disintegrate in response to rising global temperatures, leading to potentially several meters of sea-level rise during the next few centuries. It is deeply uncertain, for example, whether such an AIS disintegration will be triggered, how much this would increase sea-level rise, whether extreme storm surges intensify in a warming climate, or which emissions pathway future societies will choose. Here, we assess the impacts of these deep uncertainties on projected flooding probabilities for a levee ring in New Orleans, LA. We use 18 scenarios, presenting probabilistic projections within each one, to sample key deeply uncertain future projections of sea-level rise, radiative forcing pathways, storm surge characterization, and contributions from rapid AIS mass loss. The implications of these deep uncertainties for projected flood risk are thus characterized by a set of 18 probability distribution functions. We use a global sensitivity analysis to assess which mechanisms contribute to uncertainty in projected flood risk over the course of a 50-year design life. In line with previous work, we find that the uncertain storm surge drives the most substantial risk, followed by general AIS dynamics, in our simple model for future flood risk for New Orleans.

  13. Peculiarities of the risk management system organization in current conditions

    OpenAIRE

    MIKHIN P.O.

    2014-01-01

    Risk-management system organization problem is topical nowadays. The innovation activity is defined as an activity vulnerable to risk and needs more attention. The basic approaches and elements of organization structure development in risk-management system are considered to find out the best structure for business modelling usage. Balance and combination of risk-management system types are required in current conditions.

  14. safety risk management based on fuzzy logic at underground projects

    Directory of Open Access Journals (Sweden)

    Farhad Taherkhani

    2017-11-01

    Conclusion: In the present article, a new model was developed to calculate the probability of occurrence of the event, which so far has not been addressed in other studies. Finally, effective measures can be taken to reduce the risk of a project by eliminating the high risk factors.

  15. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  16. The Symbiose project: an integrated framework for performing environmental radiological risk assessment

    International Nuclear Information System (INIS)

    Gonze, M.A.; Mourlon, C.; Garcia-Sanchez, L.; Beaugelin, K.; Chen, T.; Le Dizes, S.

    2004-01-01

    Human health and ecological risk assessments usually require the integration of a wide range of environmental data and modelling approaches, with a varying level of detail dependent on the management objectives, the complexity of the site and the level of ignorance about the pollutant behaviour/toxicity. Like most scientists and assessors did it recently, we recognized the need for developing comprehensive, integrated and flexible approaches to risk assessment. To meet these needs, IRSN launched the Symbiose project (2002-2006) which aims first, at designing a framework for integrating and managing data, methods and knowledge of some relevance in radiological risk to humans/biota assessment studies, and second, at implementing this framework in an information management, modelling and calculation platform. Feasibility developments (currently completed) led to the specification of a fully integrated, object-oriented and hierarchical approach for describing the fate, transport and effect of radionuclides in spatially-distributed environmental systems. This innovative approach has then been implemented in a platform prototype, main components of which are a user-friendly and modular simulation environment (e.g. using GoldSim toolbox), and a hierarchical object-oriented biosphere database. Both conceptual and technical developments will be presented here. (author)

  17. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Klos, Richard; Wilmot, Roger [Galson Sciences Ltd (United Kingdom)

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference

  18. A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk

    Directory of Open Access Journals (Sweden)

    Yonggu Kim

    2018-03-01

    Full Text Available This paper focuses on an investment decision-making process for sustainable development based on the profitability impact factors for overseas projects. Investors prefer to use the discounted cash-flow method. Although this method is simple and straightforward, its critical weakness is its inability to reflect the factor volatility associated with the project evaluation. To overcome this weakness, the Value-at-Risk method is used to apply the volatility of the profitability impact factors, thereby reflecting the risks and establishing decision-making criteria for risk-averse investors. Risk-averse investors can lose relatively acceptable investment opportunities to risk-neutral or risk-amenable investors due to strict investment decision-making criteria. To overcome this problem, critical factors are selected through a Monte Carlo simulation and a sensitivity analysis, and solutions to the critical-factor problems are then found by using the Theory of Inventive Problem Solving and a business version of the Project Definition Rating Index. This study examines the process of recovering investment opportunities with projects that are investment feasible and that have been rejected when applying the criterion of the Value-at-Risk method. To do this, a probabilistic alternative approach is taken. To validate this methodology, the proposed framework for an improved decision-making process is demonstrated using two actual overseas projects of a Korean steel-making company.

  19. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  20. Evaluation of Projected Agricultural Climate Risk over the Contiguous US

    Science.gov (United States)

    Zhu, X.; Troy, T. J.; Devineni, N.

    2017-12-01

    Food demands are rising due to an increasing population with changing food preferences, which places pressure on agricultural production. Additionally, climate extremes have recently highlighted the vulnerability of our agricultural system to climate variability. This study seeks to fill two important gaps in current knowledge: how does the widespread response of irrigated crops differ from rainfed and how can we best account for uncertainty in yield responses. We developed a stochastic approach to evaluate climate risk quantitatively to better understand the historical impacts of climate change and estimate the future impacts it may bring about to agricultural system. Our model consists of Bayesian regression, distribution fitting, and Monte Carlo simulation to simulate rainfed and irrigated crop yields at the US county level. The model was fit using historical data for 1970-2010 and was then applied over different climate regions in the contiguous US using the CMIP5 climate projections. The relative importance of many major growing season climate indices, such as consecutive dry days without rainfall or heavy precipitation, was evaluated to determine what climate indices play a role in affecting future crop yields. The statistical modeling framework also evaluated the impact of irrigation by using county-level irrigated and rainfed yields separately. Furthermore, the projected years with negative yield anomalies were specifically evaluated in terms of magnitude, trend and potential climate drivers. This framework provides estimates of the agricultural climate risk for the 21st century that account for the full uncertainty of climate occurrences, range of crop response, and spatial correlation in climate. The results of this study can contribute to decision making about crop choice and water use in an uncertain future climate.

  1. Interconnection of the Degree of Risk and Life Cycle of the “Green Construction” Investment Projects

    OpenAIRE

    Lepehova Natalia; Shoshinov Vitaly

    2017-01-01

    This article analyses interconnection of the degree of risk and the life cycle of the “green building” investment projects, which is structured according to the life cycle. Main stages of the implementation of investment and construction project were considered, interconnection of the project life cycle and the level of project risk were presented in the form of graphical model, proposed a mathematical model of the risk calculation at different stages of the project life cycle, which is a fun...

  2. RIBA Project - Risk-Informed approach for In-Service Inspection of Nuclear Power Plant Components. Project summary

    International Nuclear Information System (INIS)

    Lidbury, D.; Smith, G.

    2001-12-01

    The need for a European review of a Risk-Informed Approach for In-Service Inspection of Nuclear Power Plant Components (RIBA) was identified in 1998. This was as a priority item in the programme of activities conducted in the framework of the Council Resolutions of 22 July 1975 and of 18 June 1992 on the Technological Problems of Nuclear Safety. The RIBA Project was established in November 1999 as a 24-month Study Contract funded by the European Commission within the frame of the former DG XI WGCS (Working Group on Codes and Standards). The Study Contract was subsequently managed for the EC by DG TREN. The participants in RIBA were Serco Assurance (project coordinator), Ringhals AB, EDF, Tecnatom SA and Westinghouse Electric Europe. The work is presented in a summary report with the detailed results contained in three companion reports as follows: main conclusions and recommendations, Review of Existing Risk-Informed Methodologies, A Comparative Study of Risk-Informed In-Service Inspection Applications, Conclusions and Recommendations for Risk-Informed in-service inspection methodology applied to Nuclear Power Plants in Europe. (author)

  3. Risk assessment in energy efficiency projects; Gerenciamento de riscos em projetos de eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Aragao Neto, Raymundo Moniz de

    2003-08-15

    This paper aims to present processes related to risk management in energy efficiency projects, delivered in a performance contracting basis. Introductory comments will be presented about the considered project model, emphasizing the necessity of proper processes of risk management and evaluation and their treatment according methodology developed by PMI - Project Management Institute, grouped in its publication PMBOK - Project Management Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian market reality, as a form of illustrating the considered methodology.

  4. Highlight report: Launch of a large integrated European in vitro toxicology project: EU-ToxRisk.

    Science.gov (United States)

    Daneshian, Mardas; Kamp, Hennicke; Hengstler, Jan; Leist, Marcel; van de Water, Bob

    2016-05-01

    The integrated European project, EU-ToxRisk, proudly sees itself as "flagship" exploring new alternative-to-animal approaches to chemical safety evaluation. It promotes mechanism-based toxicity testing and risk assessment according to the principles laid down for toxicology for the twenty-first century. The project was officially launched in January 2016 with a kickoff meeting in Egmond aan Zee, the Netherlands. Over 100 scientists representing academia and industry as well as regulatory authorities attended the inaugural meeting. The project will integrate advances in in vitro and in silico toxicology, read-across methods, and adverse outcome pathways. EU-ToxRisk will continue to make use of the case study strategy deployed in SEURAT-1, a FP7 initiative ended in December 2015. Even though the development of new non-animal methods is one target of EU-ToxRisk, the project puts special emphasis on their acceptance and implementation in regulatory contexts. This €30 million Horizon 2020 project involves 38 European partners and one from the USA. EU-ToxRisk aims at the "development of a new way of risk assessment."

  5. Assessing reservoir performance risk in CO2 storage projects

    International Nuclear Information System (INIS)

    Bowden, A.R.; Rigg, A.

    2005-01-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO 2 ) has been the development of a proper methodology to assess and compare alternative CO 2 injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO 2 , and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO 2 injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO 2 injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs

  6. CRITICAL RADAR: TOOL AND METHODOLOGY FOR EVALUATING CURRENT PROJECTS USING MULTIPLE VARIABLES

    Directory of Open Access Journals (Sweden)

    André M. Ferrari

    2017-06-01

    Full Text Available Many resources are invested in measurement processes of projects indicators without, however, give a clear view of which projects deserves the right attention at the right time. This paper proposes the use of statistics, through the analysis of multiple variables and their interrelationships, to give better basis to a critical assessment methodology of current projects used in a multinational mining company. The contribution of the research is to report the methodology called Critical Radar which is based on a graphical tool with simple operationalization that can support the decision making in complex environments, and has great flexibility across the different market scenarios and possible changes in companies guidelines. The tool has great potential to help evaluate current projects due to their characteristics of flexible use in different business areas; high degree of freedom for improvement; use of known market tool in its development; ease of viewing the results through charts and notes and user freedom to use any existing indicators in the company if complied with some statistical data quality characteristics.

  7. Managing dependencies in forest offset projects: toward a more complete evaluation of reversal risk

    Science.gov (United States)

    David M Cooley; Chrsitopher S Galik; Thomas P Holmes; Carolyn Kousky; Roger M Cooke

    2011-01-01

    Although forest carbon offsets can play an important role in the implementation of comprehensive climate policy, they also face an inherent risk of reversal. If such risks are positively correlated across projects, it can affect the integrity of larger project portfolios and potentially the entire offsets program. Here, we discuss three types of risks that could affect...

  8. Alpha-risk: a European project on the quantification of risks associated with multiple radiation exposures

    International Nuclear Information System (INIS)

    Laurier, D.; Monchaux, G.; Tirmarche, M.; Darby, S.; Cardis, E.; Binks, K.; Hofmann, W.; Muirhead, C.

    2006-01-01

    The Alpha-Risk research project is being conducted within the Sixth European Framework Programme (EC-FP6, 2005 -2008). It aims to improve the quantification of risks associated with multiple exposures, taking into account the contribution of different radionuclides and external exposure using specific organ dose calculations. The Alpha-Risk Consortium involves 18 partners from 9 countries, and is coordinated by the IRSN. Its composition allows a multidisciplinary collaboration between researchers in epidemiology, dosimetry, statistics, modelling and risk assessment. Alpha-Risk brings together major epidemiological studies in Europe, which are able to evaluate long-term health effects of internal exposure from radionuclides. It includes large size cohort and case-control studies, with accurate registration of individual annual exposures: uranium miner studies, studies on lung cancer and indoor radon exposure, and studies of lung cancer and leukaemia among nuclear workers exposed to transuranic nuclides (mainly uranium and plutonium), for whom organ doses will be reconstructed individually. The contribution of experts in dosimetry will allow the calculation of organ doses in presence of multiple exposures (radon decay products, uranium dust and external gamma exposure). Expression of the risk per unit organ dose will make it possible to compare results with those from other populations exposed to external radiation. The multidisciplinary approach of Alpha-Risk promotes the development of coherent and improved methodological approaches regarding risk modelling. A specific work - package is dedicated to the integration of results and their use for risk assessment, especially for radon. Alpha-Risk will contribute to a better understanding of long-term health risks following chronic low doses from internal exposures. The project also has the great potential to help resolve major public health concerns about the effects of low and/or protracted exposures, especially

  9. Alcohol consumption and low-risk drinking guidelines among adults: a cross-sectional analysis from Alberta's Tomorrow Project.

    Science.gov (United States)

    Brenner, Darren R; Haig, Tiffany R; Poirier, Abbey E; Akawung, Alianu; Friedenreich, Christine M; Robson, Paula J

    2017-12-01

    Moderate to heavy alcohol consumption is a risk factor for all-cause mortality and cancer incidence. Although cross-sectional data are available through national surveys, data on alcohol consumption in Alberta from a large prospective cohort were not previously available. The goal of these analyses was to characterize the levels of alcohol consumption among adults from the Alberta's Tomorrow Project in the context of cancer prevention guidelines. Furthermore, we conducted analyses to examine the relationships between alcohol consumption and other high-risk or risk-related behaviours. Between 2001 and 2009, 31 072 men and women aged 35 to 69 years were enrolled into Alberta's Tomorrow Project, a large provincial cohort study. Data concerning alcohol consumption in the past 12 months were obtained from 26 842 participants who completed self-administered health and lifestyle questionnaires. We conducted cross-sectional analyses on daily alcohol consumption and cancer prevention guidelines for alcohol use in relation to sociodemographic factors. We also examined the combined prevalence of alcohol consumption and tobacco use, obesity and comorbidities. Approximately 14% of men and 12% of women reported alcohol consumption exceeding recommendations for cancer prevention. Higher alcohol consumption was reported in younger age groups, urban dwellers, those with higher incomes and those who consumed more red meat. Moreover, volume of daily alcohol consumption was positively associated with current tobacco use in both men and women. Overall, men were more likely to fall in the moderate and high-risk behavioural profiles and show higher daily alcohol consumption patterns compared to women. Despite public health messages concerning the adverse impact of alcohol consumption, a sizeable proportion of Alberta's Tomorrow Project participants consumed alcohol in excess of cancer prevention recommendations. Continued strategies to promote low-risk drinking among those who choose to

  10. Risk management for noncombustion wastes

    International Nuclear Information System (INIS)

    Connor, K.K.; Rice, J.S.

    1991-01-01

    The Noncombustion Waste Risk Management Project is designed to incorporate the insights and information developed in these projects into tools that will help utilities make better noncombustion waste management decisions. Specific project goals are to synthesize information useful to utilities on noncombustion wastes, emphasize waste reduction as a priority over end-of-pipe management, develop methods to manage the costs and risks associated with noncombustion wastes (e.g., direct costs, permitting costs, liability costs, public relations costs), develop software and documentation to deliver the information and analysis methods to the industry. This project was initiated EPRI's Environment Division in late 1988. The early phases of the project involved gathering information on current noncombustion waste management practices, specific utility problems and concerns with respect to these wastes, current and potential future regulations, and current and emerging management options. Recent efforts have focused on characterizing the direct and indirect (e.g., lawsuits, remedial action) costs of managing these wastes and on developing and implementing risk management methods for a subset of wastes. The remainder of this paper describes the specific issues addressed by and the results and insights from the three completed waste-specific studies

  11. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  12. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    International Nuclear Information System (INIS)

    Maguire, J.F.; Yuan, J.

    2009-01-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  13. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Energy Technology Data Exchange (ETDEWEB)

    Maguire, J.F., E-mail: jmaguire@amsc.co [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States); Yuan, J. [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States)

    2009-10-15

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  14. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Science.gov (United States)

    Maguire, J. F.; Yuan, J.

    2009-10-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  15. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  16. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  17. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  18. [Air contamination in the Autonomous City of Buenos Aires: the current risk or future climate change, a false option].

    Science.gov (United States)

    Abrutzky, Rosana; Dawidowski, Laura; Murgida, Ana; Natenzon, Claudia Eleonor

    2014-09-01

    Based on the theoretical framework of environmental risk, this article discusses the management of air quality in the Autonomous City of Buenos Aires in relation to current and potential impacts of toxic gases and global climate change on the health of the population. Information on historical and current management of the air was linked to the results of the South American Emissions, Megacities and Climate research project to assess danger, exposure, vulnerability and uncertainty as the dimensions of risk. By contextualizing public policies developed in recent decades on this subject, it was possible to identify emerging configurations of risk and uncertainties as accelerators of social vulnerability. On the one hand, the fact that there is a positive correlation between mortality, changes in temperature and air pollution was confirmed. On the other hand, it became clear that there is a disconnect between air quality management and health care management, while limitations were found in the proposed mitigation measures relating to emissions of greenhouse gases produced by fuel, revealing uncertainties regarding their efficacy.

  19. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  20. Assessment of Transport Projects: Risk Analysis and Decision Support

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2008-01-01

    functions. New research proved that specifically two impacts stood out in transport project assessment, namely, travel time savings and construction costs. The final concern of this study has been the fitting of distributions, e.g. by the use of data from major databases developed in which Optimism Bias...... choosing probability distributions and performing real term data fits. The perspective of this Ph.D. study presents newer and better understanding of assigning risks within assessment of transport projects....

  1. Mapping cumulative environmental risks: examples from the EU NoMiracle project

    NARCIS (Netherlands)

    Pistocchi, A.; Groenwold, J.; Lahr, J.; Loos, M.; Mujica, M.; Ragas, A.M.J.; Rallo, R.; Sala, S.; Schlink, U.; Strebel, K.; Vighi, M.; Vizcaino, P.

    2011-01-01

    We present examples of cumulative chemical risk mapping methods developed within the NoMiracle project. The different examples illustrate the application of the concentration addition (CA) approach to pesticides at different scale, the integration in space of cumulative risks to individual organisms

  2. The Strategic Risk Management at Different Stages of Innovation Project

    OpenAIRE

    Pysmak Viktoriia O.

    2017-01-01

    This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried...

  3. Aespoe hard rock laboratory. Current research projects 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    In 1986 SKB decided to construct the Aespoe Hard Rock Laboratory (HRL) in order to provide an opportunity for research, development and demonstration in a realistic and undisturbed underground rock environment down to the depth planned for the future deep repository. The focus of current and future work is on development and testing of site characterization methods, verification of models describing the function of the natural and engineered barriers and development, testing, and demonstration of repository technology. The program has been organised so that all important steps in the development of a repository are covered, in other words the Aespoe HRL constitutes a `dress rehearsal` for the Swedish deep geological repository for spent fuel and other long-lived waste. Geoscientific investigations on Aespoe and nearby islands began in 1986. Aespoe was selected as the site for the laboratory in 1988. Construction of the facility, which reaches a depth of 460 m below the surface, began in 1990 and was completed in 1995. A major milestone had been reached in 1996 with the completion of the pre-investigation and construction phases of the Aespoe HRL. The comprehensive research conducted has permitted valuable development and verification of site characterization methods applied from the ground surface, boreholes, and underground excavations. The results of this research are summarised in the book `Aespoe Hard Rock Laboratory - 10 years of Research` published by SKB in 1996. The Operating Phase of the Aespoe HRL began in 1995 and is expected to continue for 15-20 years, that is until the first stage of the development of the Swedish deep geological repository for spent nuclear fuel is expected to be completed. A number of research projects were initiated at the start of the Operating Phase. Most of these projects have made substantial progress since then and important results have been obtained. The purpose of this brochure is to provide a brief presentation of the

  4. Aespoe hard rock laboratory. Current research projects 1998

    International Nuclear Information System (INIS)

    1998-01-01

    In 1986 SKB decided to construct the Aespoe Hard Rock Laboratory (HRL) in order to provide an opportunity for research, development and demonstration in a realistic and undisturbed underground rock environment down to the depth planned for the future deep repository. The focus of current and future work is on development and testing of site characterization methods, verification of models describing the function of the natural and engineered barriers and development, testing, and demonstration of repository technology. The program has been organised so that all important steps in the development of a repository are covered, in other words the Aespoe HRL constitutes a 'dress rehearsal' for the Swedish deep geological repository for spent fuel and other long-lived waste. Geoscientific investigations on Aespoe and nearby islands began in 1986. Aespoe was selected as the site for the laboratory in 1988. Construction of the facility, which reaches a depth of 460 m below the surface, began in 1990 and was completed in 1995. A major milestone had been reached in 1996 with the completion of the pre-investigation and construction phases of the Aespoe HRL. The comprehensive research conducted has permitted valuable development and verification of site characterization methods applied from the ground surface, boreholes, and underground excavations. The results of this research are summarised in the book 'Aespoe Hard Rock Laboratory - 10 years of Research' published by SKB in 1996. The Operating Phase of the Aespoe HRL began in 1995 and is expected to continue for 15-20 years, that is until the first stage of the development of the Swedish deep geological repository for spent nuclear fuel is expected to be completed. A number of research projects were initiated at the start of the Operating Phase. Most of these projects have made substantial progress since then and important results have been obtained. The purpose of this brochure is to provide a brief presentation of the

  5. Risk management in methodologies of information technology and communications projects

    Directory of Open Access Journals (Sweden)

    Jonathan Carrillo

    2013-12-01

    Full Text Available (Received: 2013/10/02 - Accepted: 2013/12/13At present there are methodologies that have several alternatives and methods to manage projects of Information and Communication Technologies. However, these do not cover a solution for the technology events that can occur in the industry, government, education, among others. In the technology market there are several models to identify and analyze risks according to relevant aspects of their area of specialty e.g. projects, in software development, communications, information security and business alignment. For this reason, this research conducted an evaluation of risk management activities of the methodologies used mostly to know which of them includes more correspondence with basic elements of IT using a rating scale.

  6. Radiation risk - historical perspective and current issues

    Energy Technology Data Exchange (ETDEWEB)

    Kellerer, Albrecht M. [Strahlenbiologisches Institut, Ludwig-Maximilians-Universitaet, Munich, Germany and Institute for Radiation Biology, GSF-National Research Center for Environment and Health, Neuherberg (Germany)

    2002-09-01

    The assessment of radiation risk needs to be seen against the background of a historical development that has reversed the initial belief in a general beneficial effect of radiation to apprehension and fear. Numerical risk estimates are, today, based on large epidemiological studies, and the observations on the A-bomb survivors are outlined as the primary source of information. Since the epidemiological findings are obtained from relatively high radiation exposures, extrapolations are required to the much lower doses that are relevant to radiation protection. The evolution of extrapolation procedures up to current attempts at mechanistic modelling is outlined, and some of the open issues are reviewed. (author)

  7. Radiation risk - historical perspective and current issues

    International Nuclear Information System (INIS)

    Kellerer, Albrecht M.

    2002-01-01

    The assessment of radiation risk needs to be seen against the background of a historical development that has reversed the initial belief in a general beneficial effect of radiation to apprehension and fear. Numerical risk estimates are, today, based on large epidemiological studies, and the observations on the A-bomb survivors are outlined as the primary source of information. Since the epidemiological findings are obtained from relatively high radiation exposures, extrapolations are required to the much lower doses that are relevant to radiation protection. The evolution of extrapolation procedures up to current attempts at mechanistic modelling is outlined, and some of the open issues are reviewed. (author)

  8. Dose and risk assessment approach for the Fernald CERCLA D ampersand D Project

    International Nuclear Information System (INIS)

    Throckmorton, J.D.; Clark, T.R.; Waligora, S.J. Jr.; Haaker, R.F.

    1994-01-01

    At the Fernald Environmental Management Project (FEMP) the uranium processing facilities used from the 1952 through 1989 are near or beyond their intended design life. These current conditions present an increasing probability for future releases of hazardous substances to the environment. To support a decision by the U.S. Department of Energy (DOE) and the Environmental Protection Agency (EPA) to remediate the buildings, a dose and risk assessment was performed to determine the extent of exposure that would be associated with the controlled decontamination and dismantlement (D ampersand D) of the Fernald facilities. A conceptual risk assessment model was developed, with exposure mechanisms and associated pathways for each potential receptor. The three receptor groups were defined as: the remediation workers, other on-site workers (those not performing D ampersand D), and off-site residents. For use in the conceptual model, an airborne source term was developed through process knowledge, other historical information and data, and air sample data from within the facilities. Individual and collective doses and risks were developed for each receptor and for each population group. The risk assessment demonstrated that all exposures resulting from the action would be within the acceptable DOE administrative control level of 2.0 rem per year for occupational workers and the acceptable EPA risk range from 10 -6 to 10 -4 for the general public

  9. RISK ANALYSIS FOR SHIP CONVERTING PROJECT ACCOMPLISHMENT (Case study of KRI KP Converting Project

    Directory of Open Access Journals (Sweden)

    Dimas Endro W

    2013-10-01

    Full Text Available Ship converting has become as prospective activity in ship building area. Operational and economical aspect are the most dominant rationale. Baseon a new fuction of converted ship, a task list which contain several jobs that must be done is listed. This accomplishment schedule not only contain a task list, but also duration for certain job title. In practical apllication job duration is maintained based on experience of project manager.  Further more, total accomplish duration is setted as time accomplishment for the project. This setted time has become reference for the project bid. Occasionaly, if accomplishment time which offered is strict, than schedule slip become as potencial nightmare. For this situation, project manager has had a cristal clearconsideration to select a proper decision wheter he will take the tender offer or not. practically, project mananger has layed on his experience to handle previous project and face  penalty if the project delayed. This paper focussed on how to measure tender offer based on risk analysis, specially for converted ship tender which has a strike time accomplishment.A new application method to analysis proposed tender based on time and penalty parameter has become a topic of this paper.

  10. Current and future flood risk to railway infrastructure in Europe

    Science.gov (United States)

    Bubeck, Philip; Kellermann, Patric; Alfieri, Lorenzo; Feyen, Luc; Dillenardt, Lisa; Thieken, Annegret H.

    2017-04-01

    CORINE, due to their line shapes. To assess current and future damage and risk to railway infrastructure in Europe, we apply the damage model RAIL -' RAilway Infrastructure Loss' that was specifically developed for railway infrastructure using empirical damage data. To adequately and comprehensively capture the line-shaped features of railway infrastructure, the assessment makes use of the open-access data set of openrailway.org. Current and future flood hazard in Europe is obtained with the LISFLOOD-based pan-European flood hazard mapping procedure combined with ensemble projections of extreme streamflow for the current century based on EURO-CORDEX RCP 8.5 climate scenarios. The presentation shows first results of the combination of the hazard data and the model RAIL for Europe.

  11. Risk analysis using AS/NZS 4360:2004, Bow-Tie diagram and ALARP on construction projects of Banyumanik Hospital

    Science.gov (United States)

    Sari, Diana Puspita; Pujotomo, Darminto; Wardani, Nadira Kusuma

    2017-11-01

    The Determination of risk is an uncertain event. Risks can have negative or positive impacts on project objectives. A project was defined as a series of activities and tasks that have a purpose, specifications, and limits of cost. Banyumanik Hospital Development Project is one of the construction projects in Semarang which have experienced some problems. The first problem is project delays on building stake. The second problem is delay of material supply. Finally, the problem that occurs is less management attention to health safety as evidenced by the unavailability of PPE for the workers. These problems will pose a risk to be a very important risk management performed by contractors at the Banyumanik Hospital Development Project to reduce the impact that would be caused by the risk borne by the provider of construction services. This research aim to risk identification, risk assessment and risk mitigation. Project risk management begins with the identification of risks based on the project life cycle. The risk assessment carried out by AS I NZS 4360: 2004 to the impacts of cost, time and quality. The results obtained from the method of AS I NZS 4360: 2004 is the risk that requires the handling of mitigation. Mitigated risk is the risk that had significant and high level. There are four risks that require risk mitigation with Bow-Tie diagrams which is work accidents, contract delays, material delays and design changes. Bow-Tie diagram method is a method for identifying causal and preventive action and recovery of a risk. Results obtained from Bow-Tie diagram method is a preventive action and recovery. This action is used as input to the ALARP method. ALARP method is used to determine the priority of the strategy proposed in the category broadly acceptable, tolerable, and unacceptable.

  12. Evaluation and financial risk management of urban renewal projects in partnership with public and private

    Directory of Open Access Journals (Sweden)

    Ehsan Hassani

    2011-10-01

    Full Text Available Financing plays an important role for renewal of old city building is find suitable financing plan. A proper financial management in one hand has a direct relationship with project main factors such as: time, cost and quality of the project, and on the other hand, achieving project goals requires a comprehensive insight of project, stockholders as well as other relative situation in regard with the project. Considering the complication of execution such projects and the number of shareholders, one of the best attitudes towards the project management is risk management. This research is a qualitative and practical, which reviews the effects of project management factors on financial return of urban renewal sachem. The required information gained through a survey and via questionnaire and interviews with specialists. This article first describes the public private financial partnership and then, based on the results gained from a case study done on one of the renewal schemes in Mashhad metropolitan areas. Next, it identifies and evaluates of positive and negative risks, which lead to threats and opportunities will be performed and will attempt to respond the existent risks. Finally, we provide a framework for the risk assessment of the housing units.

  13. City of Iqaluit's climate change impacts, infrastructure risks and adaptive capacity project

    International Nuclear Information System (INIS)

    Nielsen, D.; Kronenberger, J.

    2007-03-01

    The City of Iqaluit is an Arctic community that is very susceptible to the stresses of climate change. The city is challenged by increased flooding, coastal erosion and ground instability caused by melting of the permafrost layer. In response, the City of Iqaluit has created policies to reduce greenhouse gases and act on climate change. A project has also been launched to develop adaptation strategies, with particular focus on infrastructure vulnerability given the environmental and climate change in the Canadian Arctic. The purpose of the study is to evaluate the biophysical exposure and hazards on Arctic coasts subject to effects of climate change, identify past and current management strategies used to manage risks in coastal communities which have already experienced environmental change, and to evaluate the adaptive capacity of communities for dealing with coastal hazards throughout the Arctic. This document identified the risks to Iqaluit's infrastructure, including buildings, roads, water supply, wastewater treatment and waste disposal systems. Adaptation options were also developed. These ranged from educational programs and retrofits to policy changes and building standard amendments. refs., tabs., figs

  14. Allocating risk capital for a brownfields redevelopment project under hydrogeological and financial uncertainty.

    Science.gov (United States)

    Yu, Soonyoung; Unger, Andre J A; Parker, Beth; Kim, Taehee

    2012-06-15

    In this study, we defined risk capital as the contingency fee or insurance premium that a brownfields redeveloper needs to set aside from the sale of each house in case they need to repurchase it at a later date because the indoor air has been detrimentally affected by subsurface contamination. The likelihood that indoor air concentrations will exceed a regulatory level subject to subsurface heterogeneity and source zone location uncertainty is simulated by a physics-based hydrogeological model using Monte Carlo realizations, yielding the probability of failure. The cost of failure is the future value of the house indexed to the stochastic US National Housing index. The risk capital is essentially the probability of failure times the cost of failure with a surcharge to compensate the developer against hydrogeological and financial uncertainty, with the surcharge acting as safety loading reflecting the developers' level of risk aversion. We review five methodologies taken from the actuarial and financial literature to price the risk capital for a highly stylized brownfield redevelopment project, with each method specifically adapted to accommodate our notion of the probability of failure. The objective of this paper is to develop an actuarially consistent approach for combining the hydrogeological and financial uncertainty into a contingency fee that the brownfields developer should reserve (i.e. the risk capital) in order to hedge their risk exposure during the project. Results indicate that the price of the risk capital is much more sensitive to hydrogeological rather than financial uncertainty. We use the Capital Asset Pricing Model to estimate the risk-adjusted discount rate to depreciate all costs to present value for the brownfield redevelopment project. A key outcome of this work is that the presentation of our risk capital valuation methodology is sufficiently generalized for application to a wide variety of engineering projects. Copyright © 2012 Elsevier

  15. Risk Classification and Risk-based Safety and Mission Assurance

    Science.gov (United States)

    Leitner, Jesse A.

    2014-01-01

    Recent activities to revamp and emphasize the need to streamline processes and activities for Class D missions across the agency have led to various interpretations of Class D, including the lumping of a variety of low-cost projects into Class D. Sometimes terms such as Class D minus are used. In this presentation, mission risk classifications will be traced to official requirements and definitions as a measure to ensure that projects and programs align with the guidance and requirements that are commensurate for their defined risk posture. As part of this, the full suite of risk classifications, formal and informal will be defined, followed by an introduction to the new GPR 8705.4 that is currently under review.GPR 8705.4 lays out guidance for the mission success activities performed at the Classes A-D for NPR 7120.5 projects as well as for projects not under NPR 7120.5. Furthermore, the trends in stepping from Class A into higher risk posture classifications will be discussed. The talk will conclude with a discussion about risk-based safety and mission assuranceat GSFC.

  16. The impact of the human genome project on risk assessment

    International Nuclear Information System (INIS)

    Katarzyna Doerffer; Paul Unrau.

    1996-01-01

    The radiation protection approach to risk assessment assumes that cancer induction following radiation exposure is purely random. Present risk assessment methods derive risk from cancer incidence frequencies in exposed populations and associate disease outcomes totally with the level of exposure to ionizing red aeon. Exposure defines a risk factor that affects the probability of the disease outcome. But cancer risk can be affected by other risk factors such as underlying genetic factors (predisposition) of the exposed organism. These genetic risk factors are now becoming available for incorporation into ionizing radiation risk assessment Progress in the Human Genome Project (HOP) will lead to direct assays to measure the effects of genetic risk determinants in disease outcomes. When all genetic risk determinants are known and incorporated into risk assessment it will be possible to reevaluate the role of ionizing radiation in the causation of cancer. (author)

  17. Ecological models and pesticide risk assessment: current modeling practice.

    Science.gov (United States)

    Schmolke, Amelie; Thorbek, Pernille; Chapman, Peter; Grimm, Volker

    2010-04-01

    Ecological risk assessments of pesticides usually focus on risk at the level of individuals, and are carried out by comparing exposure and toxicological endpoints. However, in most cases the protection goal is populations rather than individuals. On the population level, effects of pesticides depend not only on exposure and toxicity, but also on factors such as life history characteristics, population structure, timing of application, presence of refuges in time and space, and landscape structure. Ecological models can integrate such factors and have the potential to become important tools for the prediction of population-level effects of exposure to pesticides, thus allowing extrapolations, for example, from laboratory to field. Indeed, a broad range of ecological models have been applied to chemical risk assessment in the scientific literature, but so far such models have only rarely been used to support regulatory risk assessments of pesticides. To better understand the reasons for this situation, the current modeling practice in this field was assessed in the present study. The scientific literature was searched for relevant models and assessed according to nine characteristics: model type, model complexity, toxicity measure, exposure pattern, other factors, taxonomic group, risk assessment endpoint, parameterization, and model evaluation. The present study found that, although most models were of a high scientific standard, many of them would need modification before they are suitable for regulatory risk assessments. The main shortcomings of currently available models in the context of regulatory pesticide risk assessments were identified. When ecological models are applied to regulatory risk assessments, we recommend reviewing these models according to the nine characteristics evaluated here. (c) 2010 SETAC.

  18. Statistically downscaled climate projections to support evaluating climate change risks for hydropower

    International Nuclear Information System (INIS)

    Brekke, L.

    2008-01-01

    This paper described a web-served public access archive of down-scaled climate projections developed as a tool for water managers of river and hydropower systems. The archive provided access to climate projection data at basin-relevant resolution and included an extensive compilation of down-scale climate projects designed to support risk-based adaptation planning. Downscaled translations of 112 contemporary climate projections produced using the World Climate Research Program's coupled model intercomparison project were also included. Datasets for the coupled model included temperature and precipitation, monthly time-steps, and geographic coverage for the United States and portions of Mexico and Canada. It was concluded that the archive will be used to develop risk-based studies on shifts in seasonal patterns, changes in mean annual runoff, and associated responses in water resources and hydroelectric power management. Case studies demonstrating reclamation applications of archive content and potential applications for hydroelectric power production impacts were included. tabs., figs

  19. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    Science.gov (United States)

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. RISK MANAGEMENT IN THE OPERATING ACTIVITIES OF AN ENTERPRISE AND IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

    Directory of Open Access Journals (Sweden)

    Lech Jędrzejewski

    2017-03-01

    Full Text Available The paper is devoted to issues related to building a risk management system for businesses in the areas of operations and implementation of infrastructure projects. The article defines the concept of risk in business processes and identifies risks occurring in infrastructure projects. In the text, the principles have been presented for protection against the effects of political, contracting, environmental, ecological, product, process, operational and personnel risk.

  1. Alcohol consumption and low-risk drinking guidelines among adults: a cross-sectional analysis from Alberta’s Tomorrow Project

    Science.gov (United States)

    Darren R., Brenner; Tiffany R., Haig; Abbey E, Poirier; Alianu, Akawung; Christine M., Friedenreich; Paula J., Robson

    2017-01-01

    Abstract Introduction: Moderate to heavy alcohol consumption is a risk factor for all-cause mortality and cancer incidence. Although cross-sectional data are available through national surveys, data on alcohol consumption in Alberta from a large prospective cohort were not previously available. The goal of these analyses was to characterize the levels of alcohol consumption among adults from the Alberta’s Tomorrow Project in the context of cancer prevention guidelines. Furthermore, we conducted analyses to examine the relationships between alcohol consumption and other high-risk or risk-related behaviours. Methods: Between 2001 and 2009, 31 072 men and women aged 35 to 69 years were enrolled into Alberta’s Tomorrow Project, a large provincial cohort study. Data concerning alcohol consumption in the past 12 months were obtained from 26 842 participants who completed self-administered health and lifestyle questionnaires. We conducted cross-sectional analyses on daily alcohol consumption and cancer prevention guidelines for alcohol use in relation to sociodemographic factors. We also examined the combined prevalence of alcohol consumption and tobacco use, obesity and comorbidities. Results: Approximately 14% of men and 12% of women reported alcohol consumption exceeding recommendations for cancer prevention. Higher alcohol consumption was reported in younger age groups, urban dwellers, those with higher incomes and those who consumed more red meat. Moreover, volume of daily alcohol consumption was positively associated with current tobacco use in both men and women. Overall, men were more likely to fall in the moderate and high-risk behavioural profiles and show higher daily alcohol consumption patterns compared to women. Conclusion: Despite public health messages concerning the adverse impact of alcohol consumption, a sizeable proportion of Alberta’s Tomorrow Project participants consumed alcohol in excess of cancer prevention recommendations. Continued

  2. OPPORTUNITIES AND RISKS IN A CONTROL SYSTEM OF INNOVATIVE PROJECTS OF ORGANIZATIONAL DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    A.V. Grebenkin

    2008-06-01

    Full Text Available The definition of the organizational development innovative project and the technique of its estimation is in this article offered. The distinctive special feature of this method is comparison of opportunities and risks by means of essentially new system of the parameters. These parameters allow to receive a complex estimation of a condition of organizational development innovative projects. Approbation of the offered estimated technique has been lead on set of organizational development innovative projects which were realized at the enterprises of a various branch accessory. The hypothesis about necessity of definition of a condition of the project by means of an estimation of opportunities and their comparisons to risks is confirmed.

  3. Handbook for Volcanic Risk Management: an outcome from MIAVITA project

    Science.gov (United States)

    Bignami, Christian; Bosi, Vittorio; Costantini, Licia; Cristiani, Chiara; Lavigne, Franck; Thierry, Pierre

    2013-04-01

    Volcanic eruptions are one of the most impressive, violent and dramatic agents of change on Earth, threatening hundreds of millions of people. The crises management implies a strong cooperation among the main stakeholders (e.g., civil protection authorities, scientific institutions, operational forces). Considering the great amount of different actions required during the whole volcanic cycle (e.g., preparedness, unrest phase, crisis management, resilience), the role and responsibilities of stakeholders should be clarified in advance. In particular, the role of scientists, fundamental in all the phases, should be well discussed with the other stakeholders and well defined, for every country. This will allow a better management and response, and contribute to avoid misunderstanding. The new "Handbook for Volcanic Risk Management" issued by the MIAVITA European project, funded by the European Commission (Mitigate and Assess risk from Volcanic Impact on Terrain and human Activities) gives a contribution to that. Indeed, this handbook aims at synthesizing the acquired knowledge on volcanic risk management, such as prevention, preparedness, mitigation, intervention, crisis management and resilience, in a practical and useful way. It promotes the creation of an ideal bridge between different actors involved in risk management, improving and facilitating interactions among authorities and scientists. This work is based on current scientific research and the shared experience of the different MIAVITA project partners as well as on international good practices previously recommended. The handbook is composed of six sections. The first one briefly explains the global volcanic context and the principles of corresponding risk management. Section 2 contains a description of volcanic phenomena, damage and understanding size and effects that can be expected. Sections 3, 4 and 5 meet preparation and prevention issues and describe actions to be undertaken during the response phase

  4. Geography of current and future global mammal extinction risk.

    Directory of Open Access Journals (Sweden)

    Ana D Davidson

    Full Text Available Identifying which species are at greatest risk, what makes them vulnerable, and where they are distributed are central goals for conservation science. While knowledge of which factors influence extinction risk is increasingly available for some taxonomic groups, a deeper understanding of extinction correlates and the geography of risk remains lacking. Here, we develop a predictive random forest model using both geospatial and mammalian species' trait data to uncover the statistical and geographic distributions of extinction correlates. We also explore how this geography of risk may change under a rapidly warming climate. We found distinctive macroecological relationships between species-level risk and extinction correlates, including the intrinsic biological traits of geographic range size, body size and taxonomy, and extrinsic geographic settings such as seasonality, habitat type, land use and human population density. Each extinction correlate exhibited ranges of values that were especially associated with risk, and the importance of different risk factors was not geographically uniform across the globe. We also found that about 10% of mammals not currently recognized as at-risk have biological traits and occur in environments that predispose them towards extinction. Southeast Asia had the most actually and potentially threatened species, underscoring the urgent need for conservation in this region. Additionally, nearly 40% of currently threatened species were predicted to experience rapid climate change at 0.5 km/year or more. Biological and environmental correlates of mammalian extinction risk exhibit distinct statistical and geographic distributions. These results provide insight into species-level patterns and processes underlying geographic variation in extinction risk. They also offer guidance for future conservation research focused on specific geographic regions, or evaluating the degree to which species-level patterns mirror spatial

  5. Geography of current and future global mammal extinction risk.

    Science.gov (United States)

    Davidson, Ana D; Shoemaker, Kevin T; Weinstein, Ben; Costa, Gabriel C; Brooks, Thomas M; Ceballos, Gerardo; Radeloff, Volker C; Rondinini, Carlo; Graham, Catherine H

    2017-01-01

    Identifying which species are at greatest risk, what makes them vulnerable, and where they are distributed are central goals for conservation science. While knowledge of which factors influence extinction risk is increasingly available for some taxonomic groups, a deeper understanding of extinction correlates and the geography of risk remains lacking. Here, we develop a predictive random forest model using both geospatial and mammalian species' trait data to uncover the statistical and geographic distributions of extinction correlates. We also explore how this geography of risk may change under a rapidly warming climate. We found distinctive macroecological relationships between species-level risk and extinction correlates, including the intrinsic biological traits of geographic range size, body size and taxonomy, and extrinsic geographic settings such as seasonality, habitat type, land use and human population density. Each extinction correlate exhibited ranges of values that were especially associated with risk, and the importance of different risk factors was not geographically uniform across the globe. We also found that about 10% of mammals not currently recognized as at-risk have biological traits and occur in environments that predispose them towards extinction. Southeast Asia had the most actually and potentially threatened species, underscoring the urgent need for conservation in this region. Additionally, nearly 40% of currently threatened species were predicted to experience rapid climate change at 0.5 km/year or more. Biological and environmental correlates of mammalian extinction risk exhibit distinct statistical and geographic distributions. These results provide insight into species-level patterns and processes underlying geographic variation in extinction risk. They also offer guidance for future conservation research focused on specific geographic regions, or evaluating the degree to which species-level patterns mirror spatial variation in the

  6. Risk level project. Summary report, Norwegian Shelf, Phase 7; Risikonivaaprosjektet. Sammendragsrapport Norsk Sokkel, fase 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    The project 'developments in risk level - Norwegian shelf', also known as the risk level project, was initiated by the Norwegian Petroleum Directorate in 2000. From 2004 the project has been continued by Petroleum Safety Authority Norway. The project's main objectives are to measure the effect of the health, security and environment (HSE) work in the industry, and contribute to identify the areas critical to HSE, where efforts must be made to prevent unwanted events or accidents. A summary report with results from phase 7 in the project (ml)

  7. Balancing risk in regulatory decision making: the Port Granby Project case study

    International Nuclear Information System (INIS)

    Benitez, L.; Kleb, H.

    2011-01-01

    The purpose of this paper is to review the trade-offs that are routinely considered in regulatory decision making, and the policy basis and methods for making those trade-offs. Regulatory decisions under the Canadian Environmental Assessment Act (CEAA) and the Nuclear Safety and Control Act (NSCA) normally consider potential risks to the environment, human health and safety, if a project were to proceed. There is only limited consideration, under such circumstances, of the risks to the environment, human health and safety if the project were not to proceed. The focus is on the potential adverse effects of the project, except in the event of an emergency, where the focus shifts to the economic and other beneficial effects. The Port Granby long-term low-level radioactive waste management project is a project to clean up and provide appropriate local, long-term management of historic low-level radioactive waste (LLRW) in the Port Granby, Ontario area. Approximately 0.4 M m 3 of LLRW, presently located at the Port Granby Waste Management Facility, is to be transported to a newly constructed long-term waste management facility ~700 m north of the bluff face where the facility is located. Accordingly, the project is subject to environmental assessment and licensing processes under the CEAA and the NSCA, respectively. While the Port Granby Project does not represent an emergency situation, it does represent a situation that could result in a significant degree of environmental risk if the project were not to proceed. Over the course of the various studies that have been undertaken at the Waste Management Facility, it has become apparent that the facility is subject to erosion and gullying along the bluff face. The potential for the leaching of contaminants from the existing facility and the erosion of the Lake Ontario bluffs are recognized as ongoing risks that will continue and potentially worsen if the project does not proceed. The economic and other considerations that

  8. Modelling of risk events with uncertain likelihoods and impacts in large infrastructure projects

    DEFF Research Database (Denmark)

    Schjær-Jacobsen, Hans

    2010-01-01

    to prevent future budget overruns. One of the central ideas is to introduce improved risk management processes and the present paper addresses this particular issue. A relevant cost function in terms of unit prices and quantities is developed and an event impact matrix with uncertain impacts from independent......This paper presents contributions to the mathematical core of risk and uncertainty management in compliance with the principles of New Budgeting laid out in 2008 by the Danish Ministry of Transport to be used in large infrastructure projects. Basically, the new principles are proposed in order...... uncertain risk events is used to calculate the total uncertain risk budget. Cost impacts from the individual risk events on the individual project activities are kept precisely track of in order to comply with the requirements of New Budgeting. Additionally, uncertain likelihoods for the occurrence of risk...

  9. Regional absolute conductivity reconstruction using projected current density in MREIT

    International Nuclear Information System (INIS)

    Sajib, Saurav Z K; Kim, Hyung Joong; Woo, Eung Je; Kwon, Oh In

    2012-01-01

    Magnetic resonance electrical impedance tomography (MREIT) is a non-invasive technique for imaging the internal conductivity distribution in tissue within an MRI scanner, utilizing the magnetic flux density, which is introduced when a current is injected into the tissue from external electrodes. This magnetic flux alters the MRI signal, so that appropriate reconstruction can provide a map of the additional z-component of the magnetic field (B z ) as well as the internal current density distribution that created it. To extract the internal electrical properties of the subject, including the conductivity and/or the current density distribution, MREIT techniques use the relationship between the external injection current and the z-component of the magnetic flux density B = (B x , B y , B z ). The tissue studied typically contains defective regions, regions with a low MRI signal and/or low MRI signal-to-noise-ratio, due to the low density of nuclear magnetic resonance spins, short T 2 or T* 2 relaxation times, as well as regions with very low electrical conductivity, through which very little current traverses. These defective regions provide noisy B z data, which can severely degrade the overall reconstructed conductivity distribution. Injecting two independent currents through surface electrodes, this paper proposes a new direct method to reconstruct a regional absolute isotropic conductivity distribution in a region of interest (ROI) while avoiding the defective regions. First, the proposed method reconstructs the contrast of conductivity using the transversal J-substitution algorithm, which blocks the propagation of severe accumulated noise from the defective region to the ROI. Second, the proposed method reconstructs the regional projected current density using the relationships between the internal current density, which stems from a current injection on the surface, and the measured B z data. Combining the contrast conductivity distribution in the entire imaging

  10. Toward a Stakeholder Perspective on Social Stability Risk of Large Hydraulic Engineering Projects in China: A Social Network Analysis

    Directory of Open Access Journals (Sweden)

    Zhengqi He

    2018-04-01

    Full Text Available In China, large hydraulic engineering projects have made a great contribution to social economic development; at the same time, they also lead to social risks that affect social stability. The pluralism of stakeholders in large hydraulic engineering projects and the complex interrelationship among stakeholders are the important factors affecting social stability risk. Previous studies of social stability risk have mainly focused on risk identification and risk assessment, without considering the relationships among stakeholders and their linkages of risks. For large hydraulic engineering projects, this paper investigated the relevant risk factors and their interrelationships through a literature review and interviews that represented stakeholder perspectives. The key social stability risk factors were identified based on social network analysis. A multi-channel project financial system, a perfect interest compensation mechanism, an efficient prevention mechanism of group events, and a complete project schedule control system were proposed to mitigate the social stability risks. This study combined stakeholder management with risk management by using social network analysis, providing reference for the social stability risk management of large engineering projects in China.

  11. Risks and chances of combined forestry and biomass projects under the Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Dutschke, Michael; Kapp, Gerald; Lehmann, Anna; Schaefer, Volkmar (Hamburg Inst. International Economics (Germany))

    2006-06-15

    The Clean Development Mechanism (CDM) aims at reducing greenhouse gas (GHG) emissions, while at the same time taking up CO{sub 2} from the atmosphere in vegetation by means of afforestation and reforestation. In spite of these options being complementary, rules and modalities for both project classes are being treated separately in the relevant decisions by the Conference of the Parties to the UN Framework Convention on Climate Change. The present study reviews the state of bioenergy use in developing countries, modalities and procedures under the CDM, and the potential for transaction cost reduction in climate mitigation projects. There are four potential types of combinations in the matrix between small-scale - large-scale / afforestation and reforestation - bioenergy activities. We develop criteria for assessing sustainable development benefits and present an example project for each of the potential project types. We find that the individual risks of single-category projects do not increase when combining project categories and that each combination holds potential for integrated sustainability benefits. Risks for local livelihoods do increase with project size, but a transparent, participatory planning phase is able to counterbalance smallholders' lack of negotiation power. Further research will have to develop concrete project examples and blueprints with approved CDM methodologies, thereby decreasing transaction costs and risk for all potential project partners. (au)

  12. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  13. Assessing reservoir performance risk in CO{sub 2} storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, A.R. [URS Corp., San Francisco, CA (United States); Rigg, A. [CRC for Greenhouse Gas Technologies, Canberra (Australia)

    2005-07-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO{sub 2}) has been the development of a proper methodology to assess and compare alternative CO{sub 2} injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO{sub 2}, and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO{sub 2} injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO{sub 2} injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs.

  14. Students in a School Environment: A Project Focused on Family Involvement of At-Risk

    Science.gov (United States)

    Denney, Pat

    2011-01-01

    This project examined family involvement of at risk students in mid-west communities. The purpose of this project was to study the affect of family involvement on at-risk student achievement. The redefining of the perception of America has resulted in a crisis of academic performance in the traditionally slow-changing education systems. This topic…

  15. Determination of risk identification process employed by NHS for a PFI hospital project in the UK

    Directory of Open Access Journals (Sweden)

    F. E. Mohamed Ghazali

    2009-12-01

    Full Text Available Long-term concession contracts associated with Private Finance Initiative (PFI projects, such as National Health Service (NHS hospitals, are subject to substantial risks, which may not only emerge from project activities such as design and construction, but also from global issues beyond the control of project parties, such as commercial, legal and political risks. Therefore, the principal parties involved must manage risks effectively and efficiently, as early as the project initiation stage, in order to ensure a successful delivery. The aim of this paper is to examine the risk identification process of the NHS PFI hospital in the UK, as a case study, in order to determine the techniques used in risk identification, and their significance, based on estimated probabilities of occurrence. These objectives were achieved through interviews with key personnel within the NHS Trust involved. Results found the sole technique used in risk identification to be brainstorming, through which more than thirty risks were identified and classified under six risk categories: planning, pre-commissioning, design, land purchasing, construction and operation. Thirteen risks were identified as significant based on their estimated probability of occurrence had the project been developed via public procurement. The results of this research will enable public sector clients like the NHS Trust to not only identify the significant risks, which will allow them to focus more attention on developing appropriate mitigation strategies and contingency plans, but also to improve its risk identification process through the use of other techniques in order to support findings from the brainstorming process.

  16. monIT: A Portuguese Risk Communication Project on EMF

    International Nuclear Information System (INIS)

    Oliveira, Carla; Sebastiao, Daniel; Carpinteiro, Goncalo; Fernandes, Carlos A.; Correia, Luis M.

    2006-01-01

    The monIT project is a risk communication programme, aiming at providing information on exposure to electromagnetic fields (EMF) from mobile communication systems in Portugal. monIT's website, www.lxlit.pt/monit, is the main interface for dissemination of information. Besides including relevant information about EMF for both the general public and the technical community, this website provides results from extensive measurement campaigns performed all over Portugal during the last three years. This paper presents the project's structure and activities, practical results achieved and ends with some conclusions and action lines for future work. (author)

  17. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  18. Risk projection and the fertility of rural families.

    Science.gov (United States)

    Song, R

    1991-01-01

    The author comments on the theories and empirical evidence which aid in understanding the determinants of the reproductive behavior of farmers in China. The issues are defined, and discussion expands on the needs for a specific number of children in rural versus urban areas, M. Cain's risk insurance hypothesis, the importance of modes of production for the farm family, the farmer's security versus risks, and the balance between risk projection and the maximization of interest. The significance of risk projection is presented as are the implications for policy making. Neither theory of farmer's reproductive behavior, 1) the economic cost and benefit theory or 2) the need for labor theory is considered suitable. The idea that benefits exceed the costs of rearing children cannot justify the repeated cycle of poverty among farmers with many children. The Hubei Province, Danjiankou City, study which estimates rearing costs of 3360 yuan/child benefits of 305 yuan/year to the parents in old age is considered incorrect. The second theory agrees that children are needed for production but recognized surplus labor and does not account for the fact that the more children, the poorer the family. Micro demographic theories identify factors affecting demographic behavior, the extent to which factors affect fertility, and the interrelatedness of factors. The rural family feels jeopardized with one child, and the lowest tolerable number of children is 2-3 in rural areas. Manual labor is the basis of the traditional peasant economy. In this economy, loss of income is a threat whether due to crop failure, weather changes, or market changes. Payment occurs at the end of the year only. Child health is a risk due to poor nutrition and poor health facilities. Following a one-child policy might jeopardize perpetuation of the family line and provision for parents by sons. Urban risks are different. Rural families limit risk by keeping material resources, enlarging and strengthening the

  19. CONDITIONS OF SUSTAINABILITY OF INVESTMENT BUILDING PROJECTS BASED ON THE RISK MANAGEMENT CONCEPT

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2012-10-01

    minimization of risky situations requires reduction of the project implementation period; development of domestic methodologies and standards of project risk management tailored to the conditions of our construction industry is a relevant assignment.

  20. Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

    Science.gov (United States)

    Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm

    2017-09-01

    The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

  1. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  2. A proposed programme for energy risk research

    International Nuclear Information System (INIS)

    1979-01-01

    The report consists of two parts. Part I presents an overview of technological risk management, noting major contributions and current research needs. Part II details a proposed program of energy research, including discussions of some seven recommended projects. The proposed energy risk research program addresses two basic problem areas: improving the management of energy risks and energy risk communication and public response. Specific recommended projects are given for each. (Auth.)

  3. Information technology project risk management in Peru

    OpenAIRE

    Del Carpio Gallegos, Javier

    2014-01-01

    This article shows how some principles, uses, and practices of risk management are applied in information technology projects in Peru; in the last four years, in representative sectors like manufacturing, banking, information and communications, academics institutions, construction, government, consulting, services, and others. El presente artículo muestra algunos principios, usos y prácticas de cómo la gestión de riesgos de proyectos de tecnología se ha llevado a cabo en los últimos cuatr...

  4. Assessment of risks due to climate change for the Upper Tamakoshi Hydropower Project in Nepal

    Directory of Open Access Journals (Sweden)

    Sangam Shrestha

    2016-01-01

    Full Text Available Climate change poses significant challenges to hydropower development and management in mountainous basins. This study examined the impact of climate change, and the associated risks, on the energy production of the Upper Tamakoshi Hydropower Project, which is located in the Tamakoshi basin of Nepal. The outputs of three GCMs—namely MIROC-ESM, MRI-CGCM3, and MPI-ESM-M—under the Representative Concentration Pathways (RCP scenarios were used for the projection of precipitation and temperature in the future. The minimum and maximum temperatures of the basin are projected to increase by 6.33 °C and 3.82 °C, respectively, by 2100. The projected precipitation varies from −8% to +24.8%, which is expected to alter the streamflow by −37.83% to +47% in the future. Based on the streamflow output, the risk for energy production was calculated with respect to the baseline energy production of 1963 GW h and 2281 GW h. Using the three GCMs, the risk associated with annual hydropower production under altered runoff was analyzed. The risk percentage in the future periods shows a mild risk varying from 0.69% to 6.63%. MPI-ESM-M GCM projects a higher percentage of risk for energy production during the same future periods, as compared to the baseline energy production of 1963 GW h. A mild to moderate risk, ranging from 2.73% to 13.24% can be expected when energy production in the future is compared to the baseline energy production of 2281 GW h.

  5. CURRENT STATUS OF RESEARCH PROJECT ACTIVITIES IN MEDICAL UNIVERSITIES IN BULGARIA.

    Directory of Open Access Journals (Sweden)

    Svetoslav Garov

    2013-07-01

    Full Text Available Introduction: In Bulgaria there are five medical universities: in the cities of Sofia, Plovdiv, Varna, Pleven and Stara Zagora. Their main mission is training specialists in the fields of medicine and health care, increasing their qualification by means of postgraduate education and performing research activities. One of medical universities’ top priorities is encouraging research activities mainly aimed at preparation and implementation of research projects. Aim: The purpose of our study is to examine the current status of research project activities in Bulgarian medical universities.Material and methods: In order to define the science competitions related to Bulgarian medical universities we have applied a documentary and sociological approach. Results: Research projects that Bulgarian medical universities can apply for are divided into two groups – national and international. The most significant international projects are European ones since Bulgaria is an EU member state and this allows us to participate in such projects. Conclusion: Universities should strive for establishing even better conditions for encouraging application for research projects aimed at developing competent and experienced staff, even though the majority of them may not obtain approval for financing.The changes in the situation regarding Bulgarian science require the implementation and development of more research staff motivated to improve their knowledge and skills in the relevant dynamically changing competition and project field.

  6. THE FINANCIAL TOOLS FOR COVER POLITICAL RISKS IN PROJECT FINANCE

    Directory of Open Access Journals (Sweden)

    S. Naumenkova

    2016-10-01

    Full Text Available This article examines the risk-mitigation in public-private partnership. Today Ukraine is ranked as "CRT-5 country" and has high levels of economic and political risk. Political risk grows steadily because of financial and political instability in Ukraine. We conclude that investors continue to rank political risk as a key obstacle to long-term investing. The tools for cover many types of political risks such as war, terrorism, civil disturbance, breach of contract, export or operating license cancellation, currency inconvertibility and transfer restriction, change of laws and regulations etc. are described by authors. We focus on the advantages of World Bank Group Guarantee products. The guarantee instruments of the three WBG institutions for cover political risks under different circumstances are the most suitable for public-private partnership in Ukraine. In this article the political risk-mitigation with IBRD Partial Risk Guarantee put forward by authors for PPP projects in Ukraine.

  7. Development of a Blueprint Impact System of the risks on construction projects Implementation

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2015-08-01

    Full Text Available In Production and Operations Management the specialists have tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization. The research aims to develop a blue print to analyze the relationship between the impact of risk and stages of implementing of the project and, the effect of risk relationship with the type of contract, and the impact of risks to do with the type of construction works. In this paper a number of risks has been identified that have already occurred from the study of a number of construction projects completed and theoretical studies and interview a number of construction industry experts to determine the extent of the impact of these risks in each of these three axes in construction projects in Iraq for the purpose of responding and management. The study found a set of conclusions such as existing of priority in happiness of risks which proof that there is an relationship between the risks and sort of stage, contract and constructional work. In the light of what has been reached for the purpose of benefiting from the computer automated features a program have been used ( Vanguard Software System to build the decision tree in order to manage the risks according to their priority in happiness.

  8. Educational project on risk communication and reduction of the radon exposure in buildings

    International Nuclear Information System (INIS)

    Conrady, J.; Guhr, A.; Uhlig, R.

    2009-01-01

    The radon exposure in buildings is supposed to be the most important risk factor of lung cancer. In Saxony about 800 000 persons live in apartments with high radon exposure. The study discusses the effects of an educational project to communicate the facts on radon exposure in buildings and to develop risk awareness and individual initiatives to reduce the radon concentration. The project includes support and encouragement with respect of preventive and protective measures to improve the individual situation. Further items cover requirements for control and quantification of intervention impacts, development and optimization of specific strategies for a permanent risk communication in schools. Results of the pilot study are summarized.

  9. A Survey of Current and Projected Ethical Dilemmas of Rehabilitation Counselors

    Science.gov (United States)

    Hartley, Michael T.; Cartwright, Brenda Y.

    2016-01-01

    Purpose: This study surveyed current and projected ethical dilemmas of rehabilitation counselors. Method: As a mixed-methods approach, the study used both quantitative and qualitative analyses. Results: Of the 211 participants who completed the survey, 116 (55.0%) reported an ethical dilemma. Based on the descriptions, common themes involved roles…

  10. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  11. Changing pattern of landslide risk in Europe - The SafeLand project

    Science.gov (United States)

    Nadim, F.; Kalsnes, B.

    2012-04-01

    The need to protect people and property with a changing pattern of landslide hazard and risk caused by climate change and changes in demography, and the reality for societies in Europe to live with the risk associated with natural hazards, were the motives for the project SafeLand: "Living with landslide risk in Europe: Assessment, effects of global change, and risk management strategies." SafeLand is a large, integrating research project under the European Commission's 7th Framework Programme (FP7). The project started on 1 May 2009 and will end on 30 April 2012. It involves 27 partners from 12 European countries, and has international collaborators and advisers from China, India, USA, Japan and Hong Kong. SafeLand also involves 25 End-Users from 11 countries. SafeLand is coordinated by the International Centre for Geohazards (ICG) at Norwegian Geotechnical Institute in Norway. Further information on the SafeLand project can be found at its web site http://safeland-fp7.eu/. Main results achieved in SafeLand include: - Various guidelines related to landslide triggering processes and run-out modelling. - Development and testing of several empirical methods for predicting the characteristics of threshold rainfall events for triggering of precipitation-induced landslides, and development of an empirical model for assessing the changes in landslide frequency (hazard) as a function of changes in the demography and population density. - Guideline for landslide susceptibility, hazard and risk assessment and zoning. - New methodologies for physical and societal vulnerability assessment. - Identification of landslide hazard and risk hotspots for Europe. The results show clearly where areas with the largest landslide risk are located in Europe and the objective approach allows a ranking of the countries by exposed area and population. - Different regional and local climate model simulations over selected regions of Europe at spatial resolutions of 10x10 km and 2.8x2.8 km

  12. The ARGO Project: assessing NA-TECH risks on off-shore oil platforms

    Science.gov (United States)

    Capuano, Paolo; Basco, Anna; Di Ruocco, Angela; Esposito, Simona; Fusco, Giannetta; Garcia-Aristizabal, Alexander; Mercogliano, Paola; Salzano, Ernesto; Solaro, Giuseppe; Teofilo, Gianvito; Scandone, Paolo; Gasparini, Paolo

    2017-04-01

    ARGO (Analysis of natural and anthropogenic risks on off-shore oil platforms) is a 2 years project, funded by the DGS-UNMIG (Directorate General for Safety of Mining and Energy Activities - National Mining Office for Hydrocarbons and Georesources) of Italian Ministry of Economic Development. The project, coordinated by AMRA (Center for the Analysis and Monitoring of Environmental Risk), aims at providing technical support for the analysis of natural and anthropogenic risks on offshore oil platforms. In order to achieve this challenging objective, ARGO brings together climate experts, risk management experts, seismologists, geologists, chemical engineers, earth and coastal observation experts. ARGO has developed methodologies for the probabilistic analysis of industrial accidents triggered by natural events (NA-TECH) on offshore oil platforms in the Italian seas, including extreme events related to climate changes. Furthermore the environmental effect of offshore activities has been investigated, including: changes on seismicity and on the evolution of coastal areas close to offshore platforms. Then a probabilistic multi-risk framework has been developed for the analysis of NA-TECH events on offshore installations for hydrocarbon extraction.

  13. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  14. Leakage Risk Assessment for a Potential CO2 Storage Project in Saskatchewan, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Houseworth, J.E.; Oldenburg, C.M.; Mazzoldi, A.; Gupta, A.K.; Nicot, J.-P.; Bryant, S.L.

    2011-05-01

    A CO{sub 2} sequestration project is being considered to (1) capture CO{sub 2} emissions from the Consumers Cooperative Refineries Limited at Regina, Saskatchewan and (2) geologically sequester the captured CO{sub 2} locally in a deep saline aquifer. This project is a collaboration of several industrial and governmental organizations, including the Petroleum Technology Research Centre (PTRC), Sustainable Development Technology Canada (SDTC), SaskEnvironment Go Green Fund, SaskPower, CCRL, Schlumberger Carbon Services, and Enbridge. The project objective is to sequester 600 tonnes CO{sub 2}/day. Injection is planned to start in 2012 or 2013 for a period of 25 years for a total storage of approximately 5.5 million tonnes CO{sub 2}. This report presents an assessment of the leakage risk of the proposed project using a methodology known as the Certification Framework (CF). The CF is used for evaluating CO{sub 2} leakage risk associated with geologic carbon sequestration (GCS), as well as brine leakage risk owing to displacement and pressurization of brine by the injected CO{sub 2}. We follow the CF methodology by defining the entities (so-called Compartments) that could be impacted by CO{sub 2} leakage, the CO{sub 2} storage region, the potential for leakage along well and fault pathways, and the consequences of such leakage. An understanding of the likelihood and consequences of leakage forms the basis for understanding CO{sub 2} leakage risk, and forms the basis for recommendations of additional data collection and analysis to increase confidence in the risk assessment.

  15. Risk management in the project of implantation of the repository for low and intermediate level radioactive waste

    International Nuclear Information System (INIS)

    Borssatto, Maria de Fatima B.; Tello, Cledola Cassia O. de; Uemura, George

    2011-01-01

    Project RBMN is part of the Brazilian solution for the storage of radioactive waste generated by the activities of nuclear energy in Brazil. The aim of RBMN is to implement the National Repository to dispose the low and intermediate-level radioactive waste. Risk is a characteristic of all projects, and it is originated from uncertainties, assumptions and the environment of execution of the project. Risk management is the way to monitor systematically these uncertainties and a guaranty that the goals of the project will be attained. A specific methodology for the risk management of the Project RBMN is under development, which integrates models and processes for identification and analysis of risks, reactions, monitoring, control and planning of risk management. This methodology is fundamental and will be of primordial importance for future generations who will be responsible for the operation at final stages, closure and institutional control during the post-closure of the repository. It will provide greater safety to executed processes and safeguarding risks and specific solutions for this enterprise, guaranteeing the safety of the repository in its life cycle, which has a foreseen duration of at least three hundred years. The aim of this paper is to present the preliminary analysis of the opportunities, threats, strong points and weak points identified up to now, that will provide support to implement risk management procedures. The methodology will be based on the PMBOK R - Project Management Board of Knowledge - and will take into consideration the best practices for project management.(author)

  16. Incorporating risk in the economic evaluation of road infrastructure projects

    CSIR Research Space (South Africa)

    Schutte, IC

    2009-05-26

    Full Text Available credibility to the process and ensure strategic decisions that are more defendable. In this study, a prosedure for incorporating risk is suggested. It involves the identification of inputs critical to the economic success of the project, the quantification...

  17. ACCIDENT PHENOMENA OF RISK IMPORTANCE PROJECT - Continued RESEARCH CONCERNING SEVERE ACCIDENT PHENOMENA AND MANAGEMENT IN Sweden

    International Nuclear Information System (INIS)

    Rolandson, S.; Mueller, F.; Loevenhielm, G.

    1997-01-01

    Since 1988 all reactors in Sweden have mitigating measures, such as filtered vents, implemented. In parallel with the work of implementing these measures, a cooperation effort (RAMA projects) between the Swedish utilities and the Nuclear Power Inspectorate was performed to acquire sufficient knowledge about severe accident research work. The on-going project has the name Accident Phenomena of Risk Importance 3. In this paper, we will give background information about severe accident management in Sweden. In the Accident Phenomena of Risk Importance 3 project we will focus on the work concerning coolability of melted core in lower plenum which is the main focus of the In-vessel Coolability Task Group within the Accident Phenomena of Risk Importance 3 project. The Accident Phenomena of Risk Importance 3 project has joined on international consortium and the in-vessel cooling experiments are performed by Fauske and Associates, Inc. in Burr Ridge, Illinois, United States America, Sweden also intends to do one separate experiment with one instrument penetration we have in Swedish/Finnish BWR's. Other parts of the Accident Phenomena of Risk Importance 3 project, such as support to level 2 studies, the research at Royal Institute of Technology and participation in international programs, such as Cooperative Severe Accident Research Program, Advanced Containment Experiments and PHEBUS will be briefly described in the paper

  18. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  19. Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

    Science.gov (United States)

    Ray, Paul S.

    2002-01-01

    Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

  20. Current Risk Management Practices in Psychotherapy Supervision.

    Science.gov (United States)

    Mehrtens, Ilayna K; Crapanzano, Kathleen; Tynes, L Lee

    2017-12-01

    Psychotherapy competence is a core skill for psychiatry residents, and psychotherapy supervision is a time-honored approach to teaching this skill. To explore the current supervision practices of psychiatry training programs, a 24-item questionnaire was sent to all program directors of Accreditation Council for Graduate Medical Education (ACGME)-approved adult psychiatry programs. The questionnaire included items regarding adherence to recently proposed therapy supervision practices aimed at reducing potential liability risk. The results suggested that current therapy supervision practices do not include sufficient management of the potential liability involved in therapy supervision. Better protections for patients, residents, supervisors and the institutions would be possible with improved credentialing practices and better documentation of informed consent and supervision policies and procedures. © 2017 American Academy of Psychiatry and the Law.

  1. Current issues and perspectives in food safety and risk assessment.

    Science.gov (United States)

    Eisenbrand, G

    2015-12-01

    In this review, current issues and opportunities in food safety assessment are discussed. Food safety is considered an essential element inherent in global food security. Hazard characterization is pivotal within the continuum of risk assessment, but it may be conceived only within a very limited frame as a true alternative to risk assessment. Elucidation of the mode of action underlying a given hazard is vital to create a plausible basis for human toxicology evaluation. Risk assessment, to convey meaningful risk communication, must be based on appropriate and reliable consideration of both exposure and mode of action. New perspectives, provided by monitoring human exogenous and endogenous exposure biomarkers, are considered of great promise to support classical risk extrapolation from animal toxicology. © The Author(s) 2015.

  2. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  3. Peaceful Uses Initiative (PUI) — a glimpse into current and future projects

    International Nuclear Information System (INIS)

    2015-01-01

    With more than 170 projects successfully supported, benefiting more than 130 Member States, the Peaceful Uses Initiative (PUI) has been an effective mechanism for raising additional resources to meet the needs of Member States. The IAEA hopes to carry on with this initiative to further expand the benefits of the peaceful uses of nuclear science and technology in promoting broad development goals. Here is a glimpse into some of the major current and future PUI-supported projects that need additional financial contributions. For more information, see: www.iaea.org/newscenter/focus/ peaceful-uses-initiative.

  4. Peaceful Uses Initiative (PUI) — A glimpse into current and future projects

    International Nuclear Information System (INIS)

    2015-01-01

    With more than 170 projects successfully supported, benefiting more than 130 Member States, the Peaceful Uses Initiative (PUI) has been an effective mechanism for raising additional resources to meet the needs of Member States. The IAEA hopes to carry on with this initiative to further expand the benefits of the peaceful uses of nuclear science and technology in promoting broad development goals. Here is a glimpse into some of the major current and future PUI-supported projects that need additional financial contributions. For more information, see: www.iaea.org/newscenter/focus/ peaceful-uses-initiative

  5. Peaceful Uses Initiative (PUI) — A glimpse into current and future projects

    International Nuclear Information System (INIS)

    2015-01-01

    With more than 170 projects successfully supported, benefiting more than 130 Member States, the Peaceful Uses Initiative (PUI) has been an effective mechanism for raising additional resources to meet the needs of Member States. The IAEA hopes to carry on with this initiative to further expand the benefits of the peaceful uses of nuclear science and technology in promoting broad development goals. Here is a glimpse into some of the major current and future PUI-supported projects that need additional financial contributions. For more information, see: www.iaea.org/newscenter/focus/ peaceful-uses-initiative.

  6. The MERINOVA project: MEteorological RIsks as drivers of environmental inNOvation in Agro-ecosystem management

    Science.gov (United States)

    Gobin, Anne; Van de vijver, Hans; Zamani, Sepideh; Curnel, Yannick; Planchon, Viviane; Verspecht, Ann; Van Huylenbroeck, Guido

    2014-05-01

    Devastating weather-related events have captured the interest of the general public in Belgium. Extreme weather events such as droughts, heat waves and rain storms are projected to increase both in frequency and magnitude with climate change. Since more than half of the Belgian territory is managed by the agricultural sector, extreme events may have significant impacts on agro-ecosystem services and pose severe limitations to sustainable agricultural land management. The research hypothesis of the MERINOVA project is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management. The major objectives are to characterise extreme meteorological events, assess the impact on Belgian agro-ecosystems, characterise their vulnerability and resilience to these events, and explore innovative adaptation options to agricultural risk management. The project comprises of five major parts that reflect the chain of risks: the hazard, its impact on different agro-ecosystems, vulnerability, risk management and risk communication. Impacts developed from physically based models not only provide information on the state of the damage at any given time, but also assist in understanding the links between different factors causing damage and determining bio-physical vulnerability. Socio-economic impacts enlarge the basis for vulnerability mapping, risk management and adaptation options. The perspective of rising risk-exposure is exacerbated further by more limits to aid received for agricultural damage and an overall reduction of direct income support to farmers. The main findings of each of these project building blocks will be communicated. MERINOVA provides for a robust and flexible framework by demonstrating its performance across Belgian agro-ecosystems, and by ensuring its relevance to policy makers and practitioners. A strong expert and end-user network is established to help disseminating and exploiting project results to meet user needs. The

  7. Projections of Flood Risk using Credible Climate Signals in the Ohio River Basin

    Science.gov (United States)

    Schlef, K.; Robertson, A. W.; Brown, C.

    2017-12-01

    Estimating future hydrologic flood risk under non-stationary climate is a key challenge to the design of long-term water resources infrastructure and flood management strategies. In this work, we demonstrate how projections of large-scale climate patterns can be credibly used to create projections of long-term flood risk. Our study area is the northwest region of the Ohio River Basin in the United States Midwest. In the region, three major teleconnections have been previously demonstrated to affect synoptic patterns that influence extreme precipitation and streamflow: the El Nino Southern Oscillation, the Pacific North American pattern, and the Pacific Decadal Oscillation. These teleconnections are strongest during the winter season (January-March), which also experiences the greatest number of peak flow events. For this reason, flood events are defined as the maximum daily streamflow to occur in the winter season. For each gage in the region, the location parameter of a log Pearson type 3 distribution is conditioned on the first principal component of the three teleconnections to create a statistical model of flood events. Future projections of flood risk are created by forcing the statistical model with projections of the teleconnections from general circulation models selected for skill. We compare the results of our method to the results of two other methods: the traditional model chain (i.e., general circulation model projections to downscaling method to hydrologic model to flood frequency analysis) and that of using the historic trend. We also discuss the potential for developing credible projections of flood events for the continental United States.

  8. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    OpenAIRE

    Voytolovskiy Nikolay; Trebukhin Anatoliy; Shoshinov Vitaly

    2017-01-01

    This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment projec...

  9. The KnowRISK project: Tools and strategies for risk communication and learning

    Science.gov (United States)

    Musacchio, Gemma; Amaral Ferreira, Mónica; Falsaperla, Susanna; Piangiamore, Giovanna Lucia; Pino, Nicola Alessandro; Solarino, Stefano; Crescimbene, Massimo; Eva, Elena; Reitano, Danilo; Þorvaldsdottir, Solveig; Sousa Silva, Delta; Rupakhety, Rajesh; Sousa Oliveira, Carlos

    2016-04-01

    Damage of non-structural elements of buildings (i.e. partitions, ceilings, cladding, electrical and mechanical systems and furniture) is known to cause injuries and human losses. Also it has a significant impact on earthquake resilience and is yet being worldwide underestimated. The project KnowRISK (Know your city, Reduce seISmic risK through non-structural elements) is financed by the European Commission to develop prevention measures that may reduce non-structural damage in urban areas. Pilot areas of the project are within the three European participating countries, namely Portugal, Iceland and Italy. They were chosen because they are prone to damage level 2 and 3 (EMS-98, European Macroseismic Scale) that typically affects non-structural elements. We will develop and test a risk communication strategy taking into account the needs of households and schools, putting into practice a portfolio of best practice to reduce the most common non-structural vulnerabilities. We will target our actions to different societal groups, considering their cultural background and social vulnerabilities, and implement a participatory approach that will promote engagement and interaction between the scientific community, practitioners and citizens to foster knowledge on everyone's own neighborhoods, resilience and vulnerability. A Practical Guide for citizens will highlight that low-cost actions can be implemented to increase safety of households, meant as being the places where the most vulnerable societal groups, including children and elderly people, spend much of their time. Since our actions towards communication will include education, we will define tools that allow a clear and direct understanding of elements exposed to risk. Schools will be one of our target societal groups and their central role played at the community level will ensure spreading and strengthening of the communication process. Schools are often located in old or re-adapted buildings, formerly used for

  10. Mixtures of beta distributions in models of the duration of a project affected by risk

    Science.gov (United States)

    Gładysz, Barbara; Kuchta, Dorota

    2017-07-01

    This article presents a method for timetabling a project affected by risk. The times required to carry out tasks are modelled using mixtures of beta distributions. The parameters of these beta distributions are given by experts: one corresponding to the duration of a task in stable conditions, with no risks materializing, and the other corresponding to the duration of a task in the case when risks do occur. Finally, a case study will be presented and analysed: the project of constructing a shopping mall in Poland.

  11. Evolving PBPK applications in regulatory risk assessment: current situation and future goals

    Science.gov (United States)

    The presentation includes current applications of PBPK modeling in regulatory risk assessment and discussions on conflicts between assuring consistency with experimental data in current situation and the desire for animal-free model development.

  12. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  13. 工程项目的融资风险管理研究%Financing risk management research project

    Institute of Scientific and Technical Information of China (English)

    王永嘉; 陈璐

    2014-01-01

    The project financing risk management is a very important aspect of project management,in order to strengthen the management of the project financing risk,the paper detailed the financing risk management process describes the project,and the risk financing process analyzed simultaneously to find the financing process problems,and for the emergence of the problem,a project to promote the development of the main financing risk management measures,thus contributing to strengthen risk management and financing of the project.%工程项目的融资风险管理是工程项目管理的一个非常重要的方面,为了加强对工程项目融资风险的管理,本文详细的介绍工程项目的融资风险管理过程,并对融资过程中的风险进行了分析,同时找出了融资过程中出现的问题,并针对出现的问题,提出了促进工程项目融资风险管理发展的主要对策。

  14. Evaluating high risks in large-scale projects using an extended VIKOR method under a fuzzy environment

    Directory of Open Access Journals (Sweden)

    S. Ebrahimnejad

    2012-04-01

    Full Text Available The complexity of large-scale projects has led to numerous risks in their life cycle. This paper presents a new risk evaluation approach in order to rank the high risks in large-scale projects and improve the performance of these projects. It is based on the fuzzy set theory that is an effective tool to handle uncertainty. It is also based on an extended VIKOR method that is one of the well-known multiple criteria decision-making (MCDM methods. The proposed decision-making approach integrates knowledge and experience acquired from professional experts, since they perform the risk identification and also the subjective judgments of the performance rating for high risks in terms of conflicting criteria, including probability, impact, quickness of reaction toward risk, event measure quantity and event capability criteria. The most notable difference of the proposed VIKOR method with its traditional version is just the use of fuzzy decision-matrix data to calculate the ranking index without the need to ask the experts. Finally, the proposed approach is illustrated with a real-case study in an Iranian power plant project, and the associated results are compared with two well-known decision-making methods under a fuzzy environment.

  15. Effect of dietary habits on the risk of metabolic syndrome: Yazd Healthy Heart Project.

    Science.gov (United States)

    Sarebanhassanabadi, Mohammadtaghi; Mirhosseini, Seyed Jalil; Mirzaei, Masoud; Namayandeh, Seyedeh Mahdieh; Soltani, Mohammad Hossein; Pakseresht, Mohammadreza; Pedarzadeh, Ali; Baramesipour, Zahra; Faraji, Reza; Salehi-Abargouei, Amin

    2018-04-01

    Metabolic syndrome (MetS) refers to a group of risk factors that increase the risk of cardiovascular mortality and morbidity. Dietary habits are among the most important risk factors for MetS. The current study aimed at assessing the effect of dietary habits on the risk of MetS in a 10-year follow-up study in central Iran. Cohort study. Yazd, Iran. Participants aged 20-74 years without any history of MetS, who were originally recruited for Yazd Healthy Heart Project (YHHP) during 2005-2006, were revisited during 2015-2016. At phase I of YHHP, demographic data, anthropometric measurements, five components of MetS, biochemical tests and dietary habits were evaluated; and the same data were collected in phase II. A total of 1092 participants were eligible to be included in the present study. After follow-up, the 10-year cumulative incidence of MetS was 56·1 %. After adjustment for potential confounders, increased risk of MetS (hazard ratio; 95 % CI) was found in those who did not try to control their body weight (1·57; 1·06, 2·35), did not usually eat salad (1·91; 1·22, 3·00) and added salt to their food (1·57, 1·06, 2·33). These associations were stronger in men than in the total population after subgroup analysis, but were not present in women. Dietary habits affect the risk of MetS in the Iranian population. Lifestyle interventions are needed to improve dietary habits to reduce the risk of MetS. Future studies are highly recommended to confirm our results in other populations.

  16. Screening Risk Evaluation methodology

    International Nuclear Information System (INIS)

    Hopper, K.M.

    1994-01-01

    The Screening Risk Evaluation (SRE) Guidance document is a set of guidelines provided for the uniform implementation of SREs performed on D ampersand D facilities. These guidelines are designed specifically for the completion of the second (semi-quantitative screening) phase of the D ampersand D Risk-Based Process. The SRE Guidance produces screening risk scores reflecting levels of risk through the use of risk ranking indices. Five types of possible risk are calculated from the SRE: current releases, worker exposures, future releases, physical hazards, and criticality. The Current Release Index (CRI) calculates the risk to human health and the environment from ongoing or probable releases within a one year time period. The Worker Exposure Index (WEI) calculates the risk to workers, occupants, and visitors in D ampersand D facilities of contaminant exposure. The Future Release Index (FRI) calculates the risk of future releases of contaminants, after one year, to human health and the environment. The Physical Hazards Index (PHI) calculates the risk-to human health due to factors other than that of contaminants. The index of Criticality is approached as a modifying factor to the entire SRE, due to the fact that criticality issues are strictly regulated under DOE. Screening risk results will be tabulated in matrix form and Total Risk will be calculated (weighted equation) to produce a score on which to base early action recommendations. Other recommendations from the screening risk scores will be made based either on individual index scores or from reweighted Total Risk calculations. All recommendations based on the SRE will be made based on a combination of screening risk scores, decision drivers, and other considerations, determined on a project by project basis. The SRE is the first and most important step in the overall D ampersand D project level decision making process

  17. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  18. Annual effective dose due to residential radon progeny in Sweden: Evaluations based on current risk projections models and on risk estimates from a nation-wide Swedish epidemiological study

    Energy Technology Data Exchange (ETDEWEB)

    Doi, M [National Inst. of Radiological Sciences, Chiba (Japan); Lagarde, F [Karolinska Inst., Stockholm (Sweden). Inst. of Environmental Medicine; Falk, R; Swedjemark, G A [Swedish Radiation Protection Inst., Stockholm (Sweden)

    1996-12-01

    Effective dose per unit radon progeny exposure to Swedish population in 1992 is estimated by the risk projection model based on the Swedish epidemiological study of radon and lung cancer. The resulting values range from 1.29 - 3.00 mSv/WLM and 2.58 - 5.99 mSv/WLM, respectively. Assuming a radon concentration of 100 Bq/m{sup 3}, an equilibrium factor of 0.4 and an occupancy factor of 0.6 in Swedish houses, the annual effective dose for the Swedish population is estimated to be 0.43 - 1.98 mSv/year, which should be compared to the value of 1.9 mSv/year, according to the UNSCEAR 1993 report. 27 refs, tabs, figs.

  19. Annual effective dose due to residential radon progeny in Sweden: Evaluations based on current risk projections models and on risk estimates from a nation-wide Swedish epidemiological study

    International Nuclear Information System (INIS)

    Doi, M.; Lagarde, F.

    1996-12-01

    Effective dose per unit radon progeny exposure to Swedish population in 1992 is estimated by the risk projection model based on the Swedish epidemiological study of radon and lung cancer. The resulting values range from 1.29 - 3.00 mSv/WLM and 2.58 - 5.99 mSv/WLM, respectively. Assuming a radon concentration of 100 Bq/m 3 , an equilibrium factor of 0.4 and an occupancy factor of 0.6 in Swedish houses, the annual effective dose for the Swedish population is estimated to be 0.43 - 1.98 mSv/year, which should be compared to the value of 1.9 mSv/year, according to the UNSCEAR 1993 report. 27 refs, tabs, figs

  20. The Current and Projected Taxpayer Shares of US Health Costs.

    Science.gov (United States)

    Himmelstein, David U; Woolhandler, Steffie

    2016-03-01

    We estimated taxpayers' current and projected share of US health expenditures, including government payments for public employees' health benefits as well as tax subsidies to private health spending. We tabulated official Centers for Medicare and Medicaid Services figures on direct government spending for health programs and public employees' health benefits for 2013, and projected figures through 2024. We calculated the value of tax subsidies for private spending from official federal budget documents and figures for state and local tax collections. Tax-funded health expenditures totaled $1.877 trillion in 2013 and are projected to increase to $3.642 trillion in 2024. Government's share of overall health spending was 64.3% of national health expenditures in 2013 and will rise to 67.1% in 2024. Government health expenditures in the United States account for a larger share of gross domestic product (11.2% in 2013) than do total health expenditures in any other nation. Contrary to public perceptions and official Centers for Medicare and Medicaid Services estimates, government funds most health care in the United States. Appreciation of government's predominant role in health funding might encourage more appropriate and equitable targeting of health expenditures.

  1. Audit Risk Assessment in the Light of Current European Regulations

    OpenAIRE

    Ciprian-Costel Munteanu

    2015-01-01

    Recent European reforms on audit regulations have been motivated by efforts to increase audit quality, functioning and performance. We believe the adoption of Directive 2014/56 and Regulation 537/2014 strengthened the role of independent audit and risk committees, which will positively contribute towards audit quality. This paper aims to critically assess the status quo of audit risk assessment in current European standards and regulations, by conducting a theoretical analysis of different as...

  2. Risk assessment by integrating interpretive structural modeling and Bayesian network, case of offshore pipeline project

    International Nuclear Information System (INIS)

    Wu, Wei-Shing; Yang, Chen-Feng; Chang, Jung-Chuan; Château, Pierre-Alexandre; Chang, Yang-Chi

    2015-01-01

    The sound development of marine resource usage relies on a strong maritime engineering industry. The perilous marine environment poses the highest risk to all maritime work. It is therefore imperative to reduce the risk associated with maritime work by using some analytical methods other than engineering techniques. This study addresses this issue by using an integrated interpretive structure modeling (ISM) and Bayesian network (BN) approach in a risk assessment context. Mitigating or managing maritime risk relies primarily on domain expert experience and knowledge. ISM can be used to incorporate expert knowledge in a systematic manner and helps to impose order and direction on complex relationships that exist among system elements. Working with experts, this research used ISM to clearly specify an engineering risk factor relationship represented by a cause–effect diagram, which forms the structure of the BN. The expert subjective judgments were further transformed into a prior and conditional probability set to be embedded in the BN. We used the BN to evaluate the risks of two offshore pipeline projects in Taiwan. The results indicated that the BN can provide explicit risk information to support better project management. - Highlights: • We adopt an integrated method for risk assessment of offshore pipeline projects. • We conduct semi-structural interview with the experts for risk factor identification. • Interpretive structural modeling helps to form the digraph of Bayesian network (BN) • We perform the risk analysis with the experts by building a BN. • Risk evaluations of two case studies using the BN show effectiveness of the methods

  3. Space Mission Human Reliability Analysis (HRA) Project

    Science.gov (United States)

    Boyer, Roger

    2014-01-01

    The purpose of the Space Mission Human Reliability Analysis (HRA) Project is to extend current ground-based HRA risk prediction techniques to a long-duration, space-based tool. Ground-based HRA methodology has been shown to be a reasonable tool for short-duration space missions, such as Space Shuttle and lunar fly-bys. However, longer-duration deep-space missions, such as asteroid and Mars missions, will require the crew to be in space for as long as 400 to 900 day missions with periods of extended autonomy and self-sufficiency. Current indications show higher risk due to fatigue, physiological effects due to extended low gravity environments, and others, may impact HRA predictions. For this project, Safety & Mission Assurance (S&MA) will work with Human Health & Performance (HH&P) to establish what is currently used to assess human reliabiilty for human space programs, identify human performance factors that may be sensitive to long duration space flight, collect available historical data, and update current tools to account for performance shaping factors believed to be important to such missions. This effort will also contribute data to the Human Performance Data Repository and influence the Space Human Factors Engineering research risks and gaps (part of the HRP Program). An accurate risk predictor mitigates Loss of Crew (LOC) and Loss of Mission (LOM).The end result will be an updated HRA model that can effectively predict risk on long-duration missions.

  4. The formation of a risk management system for projects in the field of aquaculture innovative development in the Kaliningrad region: a case study

    Directory of Open Access Journals (Sweden)

    Serbulov Alexey

    2012-03-01

    Full Text Available This article sets out to develop the concept and the principal scheme of the formation of a risk management system for innovative economic development projects in the field of aquaculture. The research carried out by the authors helps identify the main problems and characteristics of risk management projects for the development of aquaculture in presentday Russia. The authors outline the status and features of aquaculture development projects in the North-western federal district and the Kaliningrad region. The article formulates and justifies the concept of “risk management projects in innovative development of aquaculture in the region” focusing on the classification of aquaculture risks in relation to innovative development projects, which expands the conceptual framework of risk management in view of the specific risks relating to economic development projects in the field of aquaculture. The authors characterize modern methods and approaches to risk management projects and organizations in the context of their application in the framework of aquaculture development projects and offer mechanisms for risk management of aquaculture development projects, which make it possible to include risk management activity in the general context of activities of parent project organizations. The authors develop the concept and principal scheme of the formation of risk management system for innovative development projects in aquaculture.

  5. Risk factors of cardiovascular diseases in Bushehr Port on the basis of The WHO MONICA Project The Persian Gulf Healthy Heart Project

    Directory of Open Access Journals (Sweden)

    Mohammad Amiri

    2004-02-01

    Full Text Available The majority of all deaths attributable to cardiovascular diseases (CVDs are in developing countries. There is now a pressing need for developing countries to define and implement preventive interventions for CVDs. We used WHO MONICA Project protocols to measure trends in coronary risk factors in Bushehr Port in the Persian Gulf Healthy Heart Project. Coronary risk factors of 2092 , aged >= 25 years men and women were evaluated in a cross-sectional study. Of the studied population, 97.7% had at least one coronary risk factor, 44.3% of men and 69% of women had at least two coronary risk factors. The high prevalence rates of diabetes mellitus (8.6%, central obesity (59.4%, obesity (26.8%, hypertension (24.5%, smoking (15.7%, physical inactivity (71.1%, hypercholesterolemia (24% and low HDL-cholesterol (61.5% showed that coronary risk factors prevail in Bushehr Port. Therefore, preventive strategies should be implemented immediately to avoid cardiovascular epidemic in the near future.

  6. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  7. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  8. Academy of Program/Project & Engineering Leadership Orbital Debris Management and Risk Mitigation

    Data.gov (United States)

    National Aeronautics and Space Administration — The NASA Academy of Program/Project & Engineering Leadership (APPEL) is excited to announce the public release of Orbital Debris Management and Risk Mitigation,...

  9. Current status and perspective of advanced loop type fast reactor in fast reactor cycle technology development project

    International Nuclear Information System (INIS)

    Niwa, Hajime; Aoto, Kazumi; Morishita, Masaki

    2007-01-01

    After selecting the combination of the sodium-cooled fast reactor (SFR) with oxide fuel, the advanced aqueous reprocessing and the simplified pelletizing fuel fabrication as the most promising concept of FR cycle system, 'Feasibility Study on Commercialized Fast Reactor Cycle Systems' was finalized in 2006. Instead, a new project, Fast Reactor Cycle Technology Development Project (FaCT Project) was launched in Japan focusing on development of the selected concepts. This paper describes the current status and perspective of the advanced loop type SFR system in the FaCT Project, especially on the design requirements, current design as well as the related innovative technologies together with the development road-map. Some considerations on advantages of the advanced loop type design are also described. (authors)

  10. Air travel and radiation risks - review of current knowledge

    International Nuclear Information System (INIS)

    Zeeb, H.; Blettner, M.

    2004-01-01

    Aircrew and passengers are exposed to cosmic radiation, in particular when travelling routes close to the poles and in high altitudes. The paper reviews current radiation measurement and estimation approaches as well as the actual level of cosmic radiation that personnel and travellers receive and summarizes the available epidemiological evidence on health effects of cosmic radiation. On average, German aircrew is exposed to les than 5 mSv per annum, and even frequent travellers only rarely reach values above 1 mSv/year. Cohort studies among aircrew have found very little evidence for an increased incidence or mortality of radiation-associated cancers. Only malignant melanoma rates have consistently found to be increased among male aircrew. Socioeconomic and reproductive aspects are likely to contribute to the slightly elevated breast cancer risk of female aircrew. Cytogenetic studies have not yielded consistent results. Based on these data overall risk increases for cancer among occupationally exposed aircrew appear unlikely. This also applies to air travellers who are usually exposed to much lower radiation levels. Occasional air travel during pregnancy does not pose a significant radiation risk, but further considerations apply in this situation. The currently available studies are limited with regard to methodological issues and case numbers so that a continuation of cohort studies in several European countries is being planned. (orig.) [de

  11. Associations between depression risk, bullying and current smoking among Chinese adolescents: Modulated by gender.

    Science.gov (United States)

    Guo, Lan; Hong, Lingyao; Gao, Xue; Zhou, Jinhua; Lu, Ciyong; Zhang, Wei-Hong

    2016-03-30

    This school-based study aimed to investigate the prevalence of being at risk for depression, bullying behavior, and current smoking among Chinese adolescents in order to explore gender differences in the vulnerability of adolescents with these behaviors to develop a smoking habit. A total of 35,893 high school students sampled from high schools in eighteen cities in China participated in the study from 2011 to 2012. Overall, the prevalence of current smoking was estimated at 6.4%. In total, 1.7% (618) of the participants admitted to bullying others, 5.8% (2071) reported being bullied, 3.5% (1269) were involved in both bullying others and being bullied, and 5.6% (2017) were at high risk for depression. Logistic regression analysis indicated that among girls, with high depression risk, bullying others, being bullied, and both bullying others and being bullied were independently and positively associated with current smoking habits, while the final results among boys showed that bullying others and both bullying others and being bullied were independently associated with an increased risk of current smoking. School-based prevention programs are highly recommended, and we should focus on high-risk students, particularly girls with high risk of depression or involved in school bullying and boys who are involved in school bullying. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  12. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    International Nuclear Information System (INIS)

    Collins, John W.

    2011-01-01

    . Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

  13. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    Energy Technology Data Exchange (ETDEWEB)

    John W. Collins

    2011-09-01

    . Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

  14. Performance Risks Allocation in Bot Infrastructure in Nigeria: A Case Study of Lagos Infrastructure Project

    Directory of Open Access Journals (Sweden)

    Sanni Gabriel A.

    2017-08-01

    Full Text Available The study assessed allocation, criteria and allotment effectiveness of performance risks in Build- Operate-Transfer (BOT transportation infrastructure in Nigeria using Lagos Infrastructure Project (LIP as a case study. LIP is the only BOT-procured tolled road that has attained ‘operate’ stage of BOT cycle in Nigeria. It revealed that more operating risks were actually allocated to the concessionaire than the grantor and most of the risks were preferred retained by the allottee. Significant fraction of the risks was effectively allocated between the concessionaire and grantor except those that involve close interface between participants. While grantor rated nine risks high and seven risks very high; the concessionaire assessed nine risks to be high and five risks to be very high; the grantor rated the effectiveness level to be seventy three per cent and the concessionaire assessed it to be sixty four per cent. The study recommended that the evolving knowledge from Lagos Infrastructure Project (LIP should be documented to guide future BOT transactions in Nigeria.

  15. Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model

    Directory of Open Access Journals (Sweden)

    Ming Li

    2017-09-01

    Full Text Available Prefabricated construction, a new direction for the future development of the Chinese construction industry, can maximize the requirements of “green”. As a new form of green building, prefabricated construction is of particular interest. On account of the immature development of the green building market in China, the investment risk for prefabricated construction is higher than for traditional architecture. Hence, it is especially important to improve its investment risk identification and management. This study adopts system dynamics and builds a risk identification feedback chart and risk flow chart, to comprehensively identify investment risks that projects in China may face and to process quantitative estimation of investment risk factors. Key factors influencing project investment risks are found, and corresponding measures are pointedly proposed. This paper may provide guidance and a reference for promoting the sound development of prefabricated construction in China.

  16. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  17. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2017-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and

  18. Sexual HIV Risk Among Male Parolees and Their Female Partners: The Relate Project.

    Science.gov (United States)

    Comfort, Megan; Reznick, Olga Grinstead; Dilworth, Samantha E; Binson, Diane; Darbes, Lynae A; Neilands, Torsten B

    The massively disproportionate impact of America's prison boom on communities of color has raised questions about how incarceration may affect health disparities, including disparities in HIV. Primary partners are an important source of influence on sexual health. In this paper, we investigate sexual HIV risk among male-female couples following a man's release from prison. We draw upon data from the Relate Project, a novel cross-sectional survey of recently released men and their female partners in Oakland and San Francisco, California (N=344). Inferential analyses use the actor-partner model to explore actor and partner effects on sexual HIV risk outcomes. Dyadic analyses of sexual HIV risk among male parolees and their female partners paint a complex portrait of couples affected by incarceration and of partners' influences on each other. Findings indicate that demographic factors such as education level and employment status, individual psycho-social factors such as perception of risk, and relationship factors such as commitment and power affect sexual HIV risk outcomes. The Relate Project provides a novel dataset for the dyadic analysis of sexual risk among male parolees and their female partners, and results highlight the importance of focusing on the couple as a unit when assessing HIV risk and protective behaviors. Results also indicate potentially fruitful avenues for population-specific interventions that may help to reduce sexual health disparities among couples affected by incarceration.

  19. Case management to reduce cardiovascular disease risk in American Indians and Alaska Natives with diabetes: results from the Special Diabetes Program for Indians Healthy Heart Demonstration Project.

    Science.gov (United States)

    Moore, Kelly; Jiang, Luohua; Manson, Spero M; Beals, Janette; Henderson, William; Pratte, Katherine; Acton, Kelly J; Roubideaux, Yvette

    2014-11-01

    We evaluated cardiovascular disease (CVD) risk factors in American Indians/Alaska Natives (AI/ANs) with diabetes in the Special Diabetes Program for Indians Healthy Heart (SDPI-HH) Demonstration Project. Multidisciplinary teams implemented an intensive case management intervention among 30 health care programs serving 138 tribes. The project recruited 3373 participants, with and without current CVD, between 2006 and 2009. We examined data collected at baseline and 1 year later to determine whether improvements occurred in CVD risk factors and in Framingham coronary heart disease (CHD) risk scores, aspirin use, and smoking status. A1c levels decreased an average of 0.2% (P risk scores also decreased significantly. Aspirin therapy increased significantly, and smoking decreased. Participants with more case management visits had significantly greater reductions in LDL cholesterol and A1c values. SDPI-HH successfully translated an intensive case management intervention. Creative retention strategies and an improved understanding of organizational challenges are needed for future Indian health translational efforts.

  20. Catastrophe risk data scoping for disaster risk finance in Asia

    Science.gov (United States)

    Millinship, Ian; Revilla-Romero, Beatriz

    2017-04-01

    Developing countries across Latin America, Africa, and Asia are some of the most exposed to natural catastrophes in the world. Over the last 20 years, Asia has borne almost half the estimated global economic cost of natural disasters - around 53billion annually. Losses from natural disasters can damage growth and hamper economic development and unlike in developed countries where risk is reallocated through re/insurance, typically these countries rely on budget reallocations and donor assistance in order to attempt to meet financing needs. There is currently an active international dialogue on the need to increase access to disaster risk financing solutions in Asia. The World Bank-GFDRR Disaster Risk Financing and Insurance Program with financial support from the Rockefeller Foundation, is currently working to develop regional options for disaster risk financing for developing countries in Asia. The first stage of this process has been to evaluate available catastrophe data suitable to support the design and implementation of disaster risk financing mechanisms in selected Asian countries. This project was carried out by a consortium of JBA Risk Management, JBA Consulting, ImageCat and Cat Risk Intelligence. The project focuses on investigating potential data sources for fourteen selected countries in Asia, for flood, tropical cyclone, earthquake and drought perils. The project was carried out under four stages. The first phase focused to identify and catalogue live/dynamic hazard data sources such as hazard gauging networks, or earth observations datasets which could be used to inform a parametric trigger. Live data sources were identified that provide credibility, transparency, independence, frequent reporting, consistency and stability. Data were catalogued at regional level, and prioritised at local level for five countries: Bangladesh, Indonesia, Pakistan, Sri Lanka and Viet Nam. The second phase was to identify, catalogue and evaluate catastrophe risk models

  1. Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2013-06-01

    Full Text Available The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the common risks affecting time overrun in road construction projects in the West Bank in Palestine from contractors’ viewpoint. 45 factors that might cause delays of road construction projects were defined through a detailed literature review. A questionnaire survey was performed to rank the considered factors in terms of severity and frequency. The analysis of the survey indicated that the top risks affecting time overrun in road construction projects in Palestine are: financial status of the contractors, payments delay by the owner, political situation, segmentation of the West Bank, poor communication between construction parties, lack of equipment efficiency, and high competition in bids.

  2. Audit Risk Assessment in the Light of Current European Regulations

    Directory of Open Access Journals (Sweden)

    Ciprian-Costel Munteanu

    2015-06-01

    Full Text Available Recent European reforms on audit regulations have been motivated by efforts to increase audit quality, functioning and performance. We believe the adoption of Directive 2014/56 and Regulation 537/2014 strengthened the role of independent audit and risk committees, which will positively contribute towards audit quality. This paper aims to critically assess the status quo of audit risk assessment in current European standards and regulations, by conducting a theoretical analysis of different aspects of audit risk. Our main objective is to stress the importance of detecting inherent and control risk, which lead to material misstatement at the assertion level. They need to be assessed so as to determine the nature, timing and extent of further audit procedures necessary to obtain sufficient appropriate audit evidence. These pieces of evidence enable the auditor to express an opinion on the financial statements at an acceptably low level of audit risk. Therefore, we point to the fact that researchers as well as practitioners and policymakers have to be careful when using audit tools and assessing risk levels, as their conclusions continuously shape the regulations.

  3. The prostate cancer risk stratification (ProCaRS) project: Recursive partitioning risk stratification analysis

    International Nuclear Information System (INIS)

    Rodrigues, George; Lukka, Himu; Warde, Padraig; Brundage, Michael; Souhami, Luis; Crook, Juanita; Cury, Fabio; Catton, Charles; Mok, Gary; Martin, Andre-Guy; Vigneault, Eric; Morris, Jim; Warner, Andrew; Gonzalez Maldonado, Sandra; Pickles, Tom

    2013-01-01

    Background: The Genitourinary Radiation Oncologists of Canada (GUROC) published a three-group risk stratification (RS) system to assist prostate cancer decision-making in 2001. The objective of this project is to use the ProCaRS database to statistically model the predictive accuracy and clinical utility of a proposed new multi-group RS schema. Methods: The RS analyses utilized the ProCaRS database that consists of 7974 patients from four Canadian institutions. Recursive partitioning analysis (RPA) was utilized to explore the sub-stratification of groups defined by the existing three-group GUROC scheme. 10-fold cross-validated C-indices and the Net Reclassification Index were both used to assess multivariable models and compare the predictive accuracy of existing and proposed RS systems, respectively. Results: The recursive partitioning analysis has suggested that the existing GUROC classification system could be altered to accommodate as many as six separate and statistical unique groups based on differences in BFFS (C-index 0.67 and AUC 0.70). GUROC low-risk patients would be divided into new favorable-low and low-risk groups based on PSA ⩽6 and PSA >6. GUROC intermediate-risk patients can be subclassified into low-intermediate and high-intermediate groups. GUROC high-intermediate-risk is defined as existing GUROC intermediate-risk with PSA >=10 AND either T2b/c disease or T1T2a disease with Gleason 7. GUROC high-risk patients would be subclassified into an additional extreme-risk group (GUROC high-risk AND (positive cores ⩾87.5% OR PSA >30). Conclusions: Proposed RS subcategories have been identified by a RPA of the ProCaRS database

  4. Review and Necessity of Recognizing Risk Management in Civil Projects and Contracts

    OpenAIRE

    VOSOUGHI, Pouyan; VOSOUGHI, Vandad

    2015-01-01

    Proper risk management is the reason for which risk (and its various types) is assigned to that section that is able to manage it in the best way but is the section which is able to manage the risk in the best way the same party that has the most effect on the probability of an adverse occurrence or is the section that is able to manage the results in the best way after the adverse occurrence. Now by considering the size, nature and complexity of the projects, the necessity of having the tech...

  5. The longevity risk of the Dutch Actuarial Association’s projection model

    NARCIS (Netherlands)

    F. Peters (Frederick); W.J. Nusselder (Wilma); J.P. Mackenbach (Johan)

    2012-01-01

    markdownabstractAccurate assessment of the risk that arises from further increases in life expectancy is crucial for the financial sector, in particular for pension funds and life insurance companies. The Dutch Actuarial Association presented a revised projection model in 2010, while in the same

  6. PRA (Probabilistic Risk Assessments) Participation versus Validation

    Science.gov (United States)

    DeMott, Diana; Banke, Richard

    2013-01-01

    Probabilistic Risk Assessments (PRAs) are performed for projects or programs where the consequences of failure are highly undesirable. PRAs primarily address the level of risk those projects or programs posed during operations. PRAs are often developed after the design has been completed. Design and operational details used to develop models include approved and accepted design information regarding equipment, components, systems and failure data. This methodology basically validates the risk parameters of the project or system design. For high risk or high dollar projects, using PRA methodologies during the design process provides new opportunities to influence the design early in the project life cycle to identify, eliminate or mitigate potential risks. Identifying risk drivers before the design has been set allows the design engineers to understand the inherent risk of their current design and consider potential risk mitigation changes. This can become an iterative process where the PRA model can be used to determine if the mitigation technique is effective in reducing risk. This can result in more efficient and cost effective design changes. PRA methodology can be used to assess the risk of design alternatives and can demonstrate how major design changes or program modifications impact the overall program or project risk. PRA has been used for the last two decades to validate risk predictions and acceptability. Providing risk information which can positively influence final system and equipment design the PRA tool can also participate in design development, providing a safe and cost effective product.

  7. Multi-Model Projections of River Flood Risk in Europe under Global Warming

    Directory of Open Access Journals (Sweden)

    Lorenzo Alfieri

    2018-01-01

    Full Text Available Knowledge on the costs of natural disasters under climate change is key information for planning adaptation and mitigation strategies of future climate policies. Impact models for large scale flood risk assessment have made leaps forward in the past few years, thanks to the increased availability of high resolution climate projections and of information on local exposure and vulnerability to river floods. Yet, state-of-the-art flood impact models rely on a number of input data and techniques that can substantially influence their results. This work compares estimates of river flood risk in Europe from three recent case studies, assuming global warming scenarios of 1.5, 2, and 3 degrees Celsius from pre-industrial levels. The assessment is based on comparing ensemble projections of expected damage and population affected at country level. Differences and common points between the three cases are shown, to point out main sources of uncertainty, strengths, and limitations. In addition, the multi-model comparison helps identify regions with the largest agreement on specific changes in flood risk. Results show that global warming is linked to substantial increase in flood risk over most countries in Central and Western Europe at all warming levels. In Eastern Europe, the average change in flood risk is smaller and the multi-model agreement is poorer.

  8. Risk Management Capability Maturity and Performance of Complex Product and System (CoPS Projects with an Asian Perspective

    Directory of Open Access Journals (Sweden)

    Ren, Y.

    2014-07-01

    Full Text Available Complex Products and Systems (CoPS are high value, technology and engineering-intensive capital goods. The motivation of this study is the persistent high failure rate of CoPS projects, Asian CoPS provider’s weak capability and lack of specific research on CoPS risk management. This paper evaluates risk management maturity level of CoPS projects against a general CoPS risk management capability maturity model (RM-CMM developed by the authors. An Asian based survey was conducted to investigate the value of RM to project performance, and Asian (non-Japanese CoPS implementers’ perceived application of RM practices, their strengths and weaknesses. The survey result shows that higher RM maturity level leads to higher CoPS project performance. It also shows project complexity and uncertainty moderates the relationship between some RM practices and project performance, which implies that a contingency approach should be adopted to manage CoPS risks effectively. In addition, it shows that Asian CoPS implementers are weak in RM process and there are also rooms for improvement in the softer aspects of organizational capabilities and robustness.

  9. The Swiss Virtual Campus Project NAHRIS: Experiences from a Multidisciplinary E-Learning Project in the Natural Hazard and Risk Management Domain

    Science.gov (United States)

    Lienert, Christophe; Bischof, Nicole; Hurni, Lorenz

    2009-01-01

    The overall goal of the Swiss Virtual Campus project Dealing with Natural Hazards and Risk (NAHRIS) is to create a common educational course program that compiles the most recent knowledge in the field of natural hazards and risk management. Several higher education institutes from all parts of Switzerland were involved in the realization of this…

  10. D & D screening risk evaluation guidance

    Energy Technology Data Exchange (ETDEWEB)

    Robers, S.K.; Golden, K.M.; Wollert, D.A.

    1995-09-01

    The Screening Risk Evaluation (SRE) guidance document is a set of guidelines provided for the uniform implementation of SREs performed on decontamination and decommissioning (D&D) facilities. Although this method has been developed for D&D facilities, it can be used for transition (EM-60) facilities as well. The SRE guidance produces screening risk scores reflecting levels of risk through the use of risk ranking indices. Five types of possible risk are calculated from the SRE: current releases, worker exposures, future releases, physical hazards, and criticality. The Current Release Index (CRI) calculates the current risk to human health and the environment, exterior to the building, from ongoing or probable releases within a one-year time period. The Worker Exposure Index (WEI) calculates the current risk to workers, occupants and visitors inside contaminated D&D facilities due to contaminant exposure. The Future Release Index (FRI) calculates the hypothetical risk of future releases of contaminants, after one year, to human health and the environment. The Physical Hazards Index (PHI) calculates the risks to human health due to factors other than that of contaminants. Criticality is approached as a modifying factor to the entire SRE, due to the fact that criticality issues are strictly regulated under DOE. Screening risk results will be tabulated in matrix form, and Total Risk will be calculated (weighted equation) to produce a score on which to base early action recommendations. Other recommendations from the screening risk scores will be made based either on individual index scores or from reweighted Total Risk calculations. All recommendations based on the SRE will be made based on a combination of screening risk scores, decision drivers, and other considerations, as determined on a project-by-project basis.

  11. Designing an integrated model based on the indicators Quality and Earned Value for risk management in Information Technology Projects

    OpenAIRE

    TATLARI, Mohammad Reza; KAZEMİPOOR, Hamed

    2015-01-01

    There are two effective factors on Information Technology (IT) projects risk including quality and earned value so that by controlling these two factors and their increased level in IT projects, the corresponding risk can be decreased. Therefore in present study, an integrated model was designed based on quality and earned value indicators for risk management in IT projects on a new and efficient approach. The proposed algorithm included the steps such as preparing a list of several indicator...

  12. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  13. Projective geometry for human motion, with an application to injury risk

    OpenAIRE

    Laurie, Henri; Penne, Rudi

    2004-01-01

    We give an exposition of Plucker vectors for a system of joint axes in projective 3-space. We use Plucker vectors to analyse dependencies among joint axes, and in particular show that two rotational joints rigidly joined by a bar and each with 3 degrees of freedom always forms a 5-dimensional system. We introduce the concept of reduced redundancy in a dependent set of projective Lines, and argue that reduced redundancy in the axes of a body position increases injury risk. We apply this to a s...

  14. Does risk management contribute to IT project success? A meta-analysis of empirical evidence

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    The question whether risk management contributes to IT project success is considered relevant by people from both academic and practitioners' communities already for a long time. This paper presents a meta-analysis of the empirical evidence that either supports or opposes the claim that risk

  15. A systematic risk management approach employed on the CloudSat project

    Science.gov (United States)

    Basilio, R. R.; Plourde, K. S.; Lam, T.

    2000-01-01

    The CloudSat Project has developed a simplified approach for fault tree analysis and probabilistic risk assessment. A system-level fault tree has been constructed to identify credible fault scenarios and failure modes leading up to a potential failure to meet the nominal mission success criteria.

  16. Methodologies for Improving Flight Project Information Capture, Storage, and Dissemination

    Science.gov (United States)

    Equils, Douglas J.

    2011-01-01

    This paper will discuss the drawbacks and risks of the current documentation paradigm, how Document QuickStart improves on that process and ultimately how this stream-lined approach will reduce risk and costs to the next generation of Flight Projects at JPL

  17. Country risk analysis

    International Nuclear Information System (INIS)

    David, A.

    1992-01-01

    This paper reports that the oil industry has been an internationally based industry that has been heavily dependent on outside financing sources. Historically, financing came from investment houses that, in most cases, participated in the projects as equity investors. However, investment companies can no longer satisfy the capital requirements of the current high level of exploration and development activities. The current trend is to involve commercial banks on a purely lending basis. Commercial banks, by their nature, are risk averse. In the case of oil and gas exploration and production they are asked to take not only technical risk and price risk but geopolitical risk as well. Methods have been developed by commercial banks to reduce technical and price risks to point which enables them to be comfortable with a loan. However, geopolitical risks are more difficult to assess. The risk associated with many countries are the nationalization of the investment, new tax restrictions, restriction of currency movements, and/or revisions to the production sharing agreements

  18. The Consortium for Climate Risk in the Urban Northeast: A NOAA RISA Project

    Science.gov (United States)

    Rosenzweig, C.

    2011-12-01

    The Consortium for Climate Risk in the Urban Northeast, or CCRUN, was funded in October 2010 under NOAA's Regional Integrated Sciences and Assessments (RISA) program to serve stakeholder needs in assessing and managing risks from climate variability and change. It is currently also the only RISA team with a principal focus on climate change adaptation in urban settings. While CCRUN's initial focus is on the major cities of the urban Northeast corridor (Philadelphia, New York and Boston), its work will ultimately expand to cover small and medium-sized cities in the relevant portions of Massachusetts, Rhode Island, Connecticut, New York, New Jersey and Pennsylvania as well, so that local needs for targeted climate-risk information can be served in a coordinated way. CCRUN is designed to address the complex challenges that are associated with densely populated, highly interconnected urban areas, including such as urban heat island effects; poor air quality; intense coastal development, and multifunctional settlement along inland waterways; complex overlapping institutional jurisdictions; integrated infrastructure systems; and highly diverse, and in some cases, fragile socio-economic communities. These challenges can best be addressed by the stakeholder-driven interdisciplinary approach taken by the CCRUN RISA team. As an important added benefit, the research accomplishments and lessons learned through stakeholder engagement will provide a foundation for managing climate risks in other urban areas in the United States. CCRUN's initial projects are focused in three broad sectors: Water, Coasts, and Health. Research in each of these sectors is linked through the cross-cutting themes of climate change and community vulnerability, the latter of which is especially important in considerations of environmental justice and equity. CCRUN's stakeholder-driven approach to research can therefore support investigations of the impacts of a changing climate, population growth, and

  19. Current developments in the assessment of petroleum hydrocarbon contaminated sites: Analysis, interpretation, and use of the TPH parameter for quantitative risk assessment

    International Nuclear Information System (INIS)

    Garcia-Surette, M.; Maynard, P.; Lamie, P.O.; Kaslick, C.

    1995-01-01

    In 1994, the Massachusetts Department of Environmental Protection (MDEP) estimated that petroleum-only cases comprised approximately one-half of the state's hazardous waste sites currently under investigation and/or remediation. Because of this significant percentage, it became clear that assessing petroleum sites more efficiently in terms of risk and cleanup alternatives was necessary. One of these key MDEP policies describes an alternative risk assessment approach enabling the quantitative characterization of total petroleum hydrocarbon (TPH)-related health risks. The approach relies on the use of an analytical technique by which the mass of petroleum hydrocarbons within specified carbon ranges is quantified. MDEP's TPH risk assessment approach was successfully employed at a residential site contaminated with No. 2 fuel oil. The combined use of MDEP's suggested analytical methods, alternative reference compounds and toxicity values, as well as chromatograms, standard dose equations, and an EPA-approved box model, facilitated the performance of a more realistic and cost-effective assessment of risk. Such assessment provided key management information to regulatory agencies, and project managers, as well as property owners concerned with potential property value loss

  20. The KnowRISK project - Know your city, Reduce seISmic risK through non-structural elements

    Science.gov (United States)

    Sousa Oliveria, Carlos; Amaral Ferreira, Mónica; Lopez, Mário; Sousa Silva, Delta; Musacchio, Gemma; Rupakhety, Rajesh; Falsaperla, Susanna; Meroni, Fabrizio; Langer, Horst

    2016-04-01

    Historically, there is a tendency to focus on seismic structural performance of buildings, neglecting the potential for damage of non-structural elements. In particular, non-structural elements of buildings are their architectural parts (i.e. partitions, ceilings, cladding), electrical and mechanical components (i.e., distribution panels, piping, plumbing), and contents (e.g., furniture, bookcases, computers and desktop equipment). Damage of these elements often contributes significantly to earthquake impacts. In the 1999 Izmit Earthquake, Turkey, 50% of the injuries and 3% of human losses were caused by non-structural failures. In the 2010-2011 Christchurch Earthquakes (New Zealand), 40% of building damage was induced by non-structural malfunctions. Around 70%-85% of construction cost goes into these elements, and their damage can strongly influence the ability of communities to cope with and recover from earthquakes. The project Know your city, Reduce seISmic risK through non-structural elements (KnowRISK) aims at facilitating local communities' access to expert knowledge on non-structural seismic protection solutions. The project will study seismic scenarios critical for non-structural damage, produce a portfolio of non-structural protection measures and investigate the level of awareness in specific communities. We will implement risk communication strategies that will take into account the social and cultural background and a participatory approach to raise awareness in local communities. The paradox between the progress of scientific knowledge and the ongoing increase of losses from natural disasters worldwide is a well-identified gap in the UN Hyogo Framework for Action 2005-2015, in which one of the main priorities is the investment on "knowledge use, innovation and education to build a culture of safety and resilience". The KnowRISK is well aligned with these priorities and will contribute to participatory action aimed at: i) transferring expert knowledge

  1. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    Directory of Open Access Journals (Sweden)

    Jovanović Filip P.

    2016-01-01

    Full Text Available This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reduction of the quantity of coke, whose production requires large amounts of energy, reduction of harmful exhaust emission and increase productivity of blast furnaces through the reduction of production costs. The project was complex and had high costs, so that it was necessary to predict risk events and plan responses to identified risks at an early stage of implementation, in the course of the project design, in order to minimise losses and implement the project in accordance with the defined time and cost limitations. [Projekat Ministarstva nauke Republike Srbije, br. 179081: Researching contemporary tendencies of strategic management using specialized management disciplines in function of competitiveness of Serbian economy

  2. Articulating current service development practices: a qualitative analysis of eleven mental health projects.

    Science.gov (United States)

    Jun, Gyuchan Thomas; Morrison, Cecily; Clarkson, P John

    2014-01-17

    The utilisation of good design practices in the development of complex health services is essential to improving quality. Healthcare organisations, however, are often seriously out of step with modern design thinking and practice. As a starting point to encourage the uptake of good design practices, it is important to understand the context of their intended use. This study aims to do that by articulating current health service development practices. Eleven service development projects carried out in a large mental health service were investigated through in-depth interviews with six operation managers. The critical decision method in conjunction with diagrammatic elicitation was used to capture descriptions of these projects. Stage-gate design models were then formed to visually articulate, classify and characterise different service development practices. Projects were grouped into three categories according to design process patterns: new service introduction and service integration; service improvement; service closure. Three common design stages: problem exploration, idea generation and solution evaluation - were then compared across the design process patterns. Consistent across projects were a top-down, policy-driven approach to exploration, underexploited idea generation and implementation-based evaluation. This study provides insight into where and how good design practices can contribute to the improvement of current service development practices. Specifically, the following suggestions for future service development practices are made: genuine user needs analysis for exploration; divergent thinking and innovative culture for idea generation; and fail-safe evaluation prior to implementation. Better training for managers through partnership working with design experts and researchers could be beneficial.

  3. Implementing Brief Interventions in Health Care: Lessons Learned from the Swedish Risk Drinking Project

    Directory of Open Access Journals (Sweden)

    Per Nilsen

    2011-09-01

    Full Text Available The Risk Drinking Project was a national implementation endeavour in Sweden, carried out from 2004 to 2010, based on a government initiative to give alcohol issues a more prominent place in routine primary, child, maternity and occupational health care. The article describes and analyses the project. Critical factors that were important for the results are identified. The magnitude of the project contributed to its reach and impact in terms of providers’ awareness of the project goals and key messages. The timing of the project was appropriate. The increase in alcohol consumption in Sweden and diminished opportunities for primary prevention strategies since entry to the European Union in 1995 have led to increased expectations for health care providers to become more actively involved in alcohol prevention. This awareness provided favourable conditions for this project. A multifaceted approach was used in the project. Most educational courses were held in workshops and seminars to encourage learning-by-doing. Motivational interviewing was an integral aspect. The concept of risk drinking was promoted in all the activities. Subprojects were tailored to the specific conditions of each respective setting, building on the skills the providers already had to modify existing work practices. Nurses were afforded a key role in the project.

  4. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition are all needed. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates and is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remediation activity. However, risks from all of the remediation activities, decontamination and decommissioning activities, and normal ongoing operations are imposed upon the Rocky Flats workers, the surrounding public, and the environment. Comparative Risk Analysis will provide risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures by focusing these resources on the largest risks first. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. The Comparative Risk Analysis methodology Group, consisting of community stakeholders, was established. Early stakeholder involvement in the risk analysis methodology development provides an opportunity for stakeholders to influence the risk information delivered to a decision-maker. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  5. Examination of in-service risk management at the level of the draft project for Cigeo

    International Nuclear Information System (INIS)

    2014-01-01

    This document reports the opinion of the IRSN on the issue of in-service risk management as it appears in the draft project of Cigeo. After having recalled the general context of the ASN request for this opinion, and presented the ANDRA file on in-service risk-management of the draft project for Cigeo, this report describes the underground installation and the different flows during the exploitation phase, and recalls the various evolutions of Cigeo general design from the 2009 file to the draft project. The next part reports the examination by the IRSN of the relevance of the in-service safety approach by the ANDRA. The next chapter reports the examination of the risk analysis made by the ANDRA on radioactive material dissemination, fire (protection measures, ventilation control, case of exothermal reactions), explosion, handling, co-activity, as well as ageing and maintenance of storage components, intervention in accidental and incidental situation and possibility of retrieval of waste packages

  6. Single and combined metal contamination in coastal environments in China: current status and potential ecological risk evaluation.

    Science.gov (United States)

    Manzoor, Romana; Zhang, Tingwan; Zhang, Xuejiao; Wang, Min; Pan, Jin-Fen; Wang, Zhumei; Zhang, Bo

    2018-01-01

    With the development of industrialization and urbanization, metal and metalloid pollution is one of the most serious environmental problems in China. Current contamination status of metals and metalloid and their potential ecological risks along China's coasts were reviewed in the present paper by a comprehensive study on metal contents in marine waters and sediments in the past few decades. The priority metals/metalloid cadmium (Cd), mercury (Hg), chromium (Cr), lead (Pb), and arsenic (As), which were the target elements of the designated project "Comprehensive Prevention and Control of Heavy Metal Pollution" issued by the Chinese government in 2011, were selected considering their high toxicity, persistence, and prevalent existence in coastal environment. Commonly used environmental quality evaluation methods for single and combined metals were compared, and we accordingly suggest the comprehensive approach of joint utilization of the Enrichment Factor and Effect Range Median combined with Pollution Load Index and Mean Effect Range Median Quotient (EEPME); this battery of guidelines may provide consistent, internationally comparable, and accurate understanding of the environment pollution status of combined metals/metalloid and their potential ecological risk.

  7. NGNP Risk Management Database: A Model for Managing Risk

    International Nuclear Information System (INIS)

    Collins, John

    2009-01-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft(reg s ign) Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool's design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  8. NGNP Risk Management Database: A Model for Managing Risk

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  9. HIV risk-taking behaviour among injecting drug users currently, previously and never enrolled in methadone treatment.

    Science.gov (United States)

    Baker, A; Kochan, N; Dixon, J; Wodak, A; Heather, N

    1995-04-01

    This study compares the injecting and sexual risk-taking behaviour among injecting drug users (IDUs) currently, previously and never enrolled in methadone maintenance treatment (MMT). All subjects had injected during the 6 months prior to the day of interview. The current MMT group showed significantly lower injecting risk-taking behaviour subscale scores on the HIV Risk-taking Behaviour Scale (HRBS) of the Opiate Treatment Index than the previous MMT and non-MMT groups together. The current MMT group differed from the other two groups in the frequency of injecting and cleaning of injection equipment with bleach. There was no difference between the current MMT group and the other two groups combined in sexual risk-taking behaviour scores on the HRBS. There were no differences between the previous MMT and non-MMT groups in injecting and sexual risk-taking behaviour. HIV seroprevalence was low and there was no difference in seroprevalence between groups. Thus, IDUs currently enrolled in MMT are at reduced risk for HIV infection when compared with IDUs who have previously or never been enrolled in MMT. However, the absence of a difference between the current MMT and other two groups in frequency of sharing behaviours suggests the need for additional strategies among MMT clients to reduce needle-sharing. Possible strategies include the application of relapse prevention interventions and the availability of sterile injecting equipment in MMT clinics. Further research is needed to identify factors which increase attraction and retention of IDUs to MMT.

  10. Managing Programmatic Risk for Complex Space System Developments

    Science.gov (United States)

    Panetta, Peter V.; Hastings, Daniel; Brumfield, Mark (Technical Monitor)

    2001-01-01

    Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.

  11. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Gurram, M.; Wolfe, S.; Marker, N.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2018-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm. The medical system requirements are being developed in parallel with the exploration mission architecture and vehicle design. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products supported by current prototype development will directly inform exploration medical system requirements.

  12. Risk analysis in the management of urban construction projects from the perspective of the employer and the contractor

    Directory of Open Access Journals (Sweden)

    Mohammad Taghipour

    2015-12-01

    Full Text Available Imbalance between anticipated and actual progress in the development of urban construction projects suggests that there are many obstacles and risks which not only causes the urban management be unsustainable, but the reconstruction and development of urban space is also seriously threatened. In this study, the library research on issues related to the risk of construction projects was done, then some interviews were conducted with experts and managers informed and involved in the projects, and finally questionnaires were distributed to identify and classify the impact of the risks of the implementation of the construction projects. After analyzing the data, the results indicated that the experts listed the most significant risks as the delays in the payment of contractors' claims and statements due to the lack of handling financial instruments, the governance of relationships rather than rules in the tenders resulting from employer actions, low commitment to the quality of work provided by their subcontractors, failure to complete the detail engineering by foreign contractors on time, weaknesses in contractors' financial resources, and offering lower prices than reasonable by contractors to win the tender. All of these require special attention and other kinds of risks are important at the next level. Finally, the solutions for eliminating or reducing risks in high-risk areas have been offered to provide tranquility for contractors and employers.

  13. 房地产项目融资风险评价分析%Analysis of Real Estate Project Financing Risk Evaluation

    Institute of Scientific and Technical Information of China (English)

    王军; 杨光

    2016-01-01

    项目融资作为一种重要的国际金融工具应用于商业房地产领域,是一种全新的探索.随着我国经济体质改革的不断发展和深入,我国房地产行业不断发展,已经逐渐成为我国经济发展的重要支柱之一,也越来越受到国内外的关注.目前,我国房地产项目融资方式众多,但仍然存在许多融资风险问题.这些风险可能最后导致整个项目的失败,给我国经济带来很大损失.房地产项目融资风险大且复杂,但是可以通过对房地产项目融资风险进行总结,并建立模糊评价模型进行风险分析.运用模糊综合评价方法对商业房地产项目融资风险进行评价是一个多目标、多层次、结构复杂和因素众多的大系统,能够对房地产项目融资风险做一个很好的诠释和解析,作为房地产项目选择融资方案的重要依据,可为房地产项目融资减少不必要的损失.%The project financing was a kind of important international financial tools,used in commercial real estate field,and was a kind of brand-new exploration.With the continuous development and deepening of economic restructuring,the develop-ment of China's real estate industry gradually became an important pillar of China's economic development,and was paid close attention by domestic and foreign personnel.Currently,there were many financing ways of the real estate project,but there were still many problems in financing risks which finally led to the entire project failure and brought great loss to China's economy.The real estate project financing risks were large and complex,but the fuzzy evaluation model could be established to analyze the risks through the summary on the financing risk of real estate project.The use of It was a large system of a multi-objective,multi-level,complex structure and factors to use fuzzy comprehensive evaluation method to evaluate the financing risk of commercial real estate project,and the system could do a very

  14. Probability-of-success studies for geothermal projects: from subsurface data to geological risk analysis

    Science.gov (United States)

    Schumacher, Sandra; Pierau, Roberto; Wirth, Wolfgang

    2017-04-01

    In recent years, the development of geothermal plants in Germany has increased significantly due to a favorable political setting and resulting financial incentives. However, most projects are developed by local communities or private investors, which cannot afford a project to fail. To cover the risk of total loss if the geothermal well should not provide the energy output necessary for an economically viable project, investors try to procure insurances for this worst case scenario. In order to issue such insurances, the insurance companies insist on so called probability-of-success studies (POS studies), in which the geological risk for not achieving the necessary temperatures and/or flow rates for an economically successful project is quantified. Quantifying the probability of reaching a minimum temperature, which has to be defined by the project investors, is relatively straight forward as subsurface temperatures in Germany are comparatively well known due tens of thousands of hydrocarbon wells. Moreover, for the German Molasse Basin a method to characterize the hydraulic potential of a site based on pump test analysis has been developed and refined in recent years. However, to quantify the probability of reaching a given flow rate with a given drawdown is much more challenging in areas where pump test data are generally not available (e.g. the North German Basin). Therefore, a new method based on log and core derived porosity and permeability data was developed to quantify the geological risk of reaching a determined flow rate in such areas. We present both methods for POS studies and show how subsurface data such as pump tests or log and core measurements can be used to predict the chances of a potential geothermal project from a geological point of view.

  15. The KnowRISK project: Tools and strategies to reduce non-structural damage

    Science.gov (United States)

    Sousa Oliveira, Carlos; Lopes, Mário; Mota de Sá, Francisco; Amaral Ferreia, Mónica; Candeias, Paulo; Campos Costa, Alfredo; Rupakhety, Rajesh; Meroni, Fabrizio; Azzaro, Raffaele; D'Amico, Salvatore; Langer, Horst; Musacchio, Gemma; Sousa Silva, Delta; Falsaperla, Susanna; Scarfì, Luciano; Tusa, Giuseppina; Tuvé, Tiziana

    2016-04-01

    The project KnowRISK (Know your city, Reduce seISmic risK through non-structural elements) is financed by the European Commission to develop prevention measures that may reduce non-structural damage in urban areas. Pilot areas of the project are within the three European participating countries, namely Portugal, Iceland and Italy. Non-structural components of a building include all those components that are not part of the structural system, more specifically the architectural, mechanical, electrical, and plumbing systems, as well as furniture, fixtures, equipment, and contents. Windows, partitions, granite veneer, piping, ceilings, air conditioning ducts and equipment, elevators, computer and hospital equipment, file cabinets, and retail merchandise are all examples of non-structural components that are vulnerable to earthquake damage. We will use the experience gained during past earthquakes, which struck in particular Iceland, Italy and Portugal (Azores). Securing the non-structural elements improves the safety during an earthquake and saves lives. This paper aims at identifying non-structural seismic protection measures in the pilot areas and to develop a portfolio of good practices for the most common and serious non-structural vulnerabilities. This systematic identification and the portfolio will be achieved through a "cross-knowledge" strategy based on previous researches, evidence of non-structural damage in past earthquakes. Shake table tests of a group of non-structural elements will be performed. These tests will be filmed and, jointly with portfolio, will serve as didactic supporting tools to be used in workshops with building construction stakeholders and in risk communication activities. A Practical Guide for non-structural risk reduction will be specifically prepared for citizens on the basis of the outputs of the project, taking into account the local culture and needs of each participating country.

  16. Risk Perceptions of Little Cigar and Cigarillo Smoking Among Adult Current Cigarette Smokers.

    Science.gov (United States)

    Sterling, Kymberle L; Majeed, Ban A; Nyman, Amy; Eriksen, Michael

    2017-11-01

    Few studies have examined the perceptions of risk of little cigar and cigarillo (LCC) smoking among cigarette smokers, which is important for expanding regulatory policies and developing prevention programs. We examined current cigarette smokers' perceived harm of LCC smoking, and determined whether these perceptions were associated with susceptibility and intention to continue smoking LCCs. Data were from the 2014 Tobacco Products and Risk Perceptions Survey of a probability sample of 5717 US adults. Data were analyzed for a subsample of 1191 current cigarette smokers who were stratified into three groups: (1) dual current cigarette smokers who had ever used LCCs, (2) current smokers susceptible to LCC smoking, and (3) current smokers who were not susceptible to LCC smoking. Overall, 47.2% of participants were dual smokers, 12.7% were susceptible to LCC smoking, and 40.1% were not susceptible. Perceptions of risk of LCCs varied across the groups. Dual smokers were more likely to perceive that daily LCC smoking is "very risky" (OR = 1.64, 95% CI = 1.08, 2.41) while occasional LCC smoking is only "somewhat risky" (OR = 1.71, 95% CI = 1.02, 2.87). Of the dual smokers, 20.7% intended to continue smoking LCCs in the future. Perceptions of addiction and risk of daily LCC smoking significantly predicted intention to continue LCC smoking. Addiction perceptions also significantly predicted susceptibility to initiate LCC smoking. Perceptions about harms from and addiction to LCCs could predict future LCC smoking. Health communication campaigns need to address the harms of LCCs. Our data suggest that perceptions of risk about the addictiveness of LCCs and frequency of use are important determinants of the LCC smoking susceptibility among some cigarette smokers and intended continued use among cigarette smokers with a history of LCC use. Health communication campaigns should address misperceptions related to LCCs. © The Author 2016. Published by Oxford University Press on

  17. D ampersand D screening risk evaluation guidance

    International Nuclear Information System (INIS)

    Robers, S.K.; Golden, K.M.; Wollert, D.A.

    1995-09-01

    The Screening Risk Evaluation (SRE) guidance document is a set of guidelines provided for the uniform implementation of SREs performed on decontamination and decommissioning (D ampersand D) facilities. Although this method has been developed for D ampersand D facilities, it can be used for transition (EM-60) facilities as well. The SRE guidance produces screening risk scores reflecting levels of risk through the use of risk ranking indices. Five types of possible risk are calculated from the SRE: current releases, worker exposures, future releases, physical hazards, and criticality. The Current Release Index (CRI) calculates the current risk to human health and the environment, exterior to the building, from ongoing or probable releases within a one-year time period. The Worker Exposure Index (WEI) calculates the current risk to workers, occupants and visitors inside contaminated D ampersand D facilities due to contaminant exposure. The Future Release Index (FRI) calculates the hypothetical risk of future releases of contaminants, after one year, to human health and the environment. The Physical Hazards Index (PHI) calculates the risks to human health due to factors other than that of contaminants. Criticality is approached as a modifying factor to the entire SRE, due to the fact that criticality issues are strictly regulated under DOE. Screening risk results will be tabulated in matrix form, and Total Risk will be calculated (weighted equation) to produce a score on which to base early action recommendations. Other recommendations from the screening risk scores will be made based either on individual index scores or from reweighted Total Risk calculations. All recommendations based on the SRE will be made based on a combination of screening risk scores, decision drivers, and other considerations, as determined on a project-by-project basis

  18. Evaluating the Investment Benefit of Multinational Enterprises' International Projects Based on Risk Adjustment: Evidence from China

    Science.gov (United States)

    Chen, Chong

    2016-01-01

    This study examines the international risks faced by multinational enterprises to understand their impact on the evaluation of investment projects. Moreover, it establishes a 'three-dimensional' theoretical framework of risk identification to analyse the composition of international risk indicators of multinational enterprises based on the theory…

  19. Decision making and risk analysis during the development of wind energy projects

    International Nuclear Information System (INIS)

    Vanhaesebroeck, M.

    2004-11-01

    This study aims at determining a methodology or criteria which can be used as decision making tools for the development of wind power projects and for the objective profitability comparison between several projects. In the first part, the different steps of the development of a wind power project in France are described. For each step, the cost of the studies, the related approaches and the main risks of abandonment are precised. The potential time drifts in the planning of the project are identified on the basis of the experience feedback of the first years of wind power development in France. In the second part, the possibilities of using classical investment choice techniques are analyzed. The characteristics having more impact on the project profitability are identified. In the third part, the sequential models with increasing information are used to evaluate a project, whatever its level of development. Finally, a concrete case is considered to see how these models can be used as decision making tools during key steps of wind farms development. (J.S.)

  20. How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management

    CERN Document Server

    Ward, Stephen

    2011-01-01

    Since I wrote the Foreword for the second edition of this book, risk management processes have become much more widely used, but controversy about what should be done and how best to do it has grown. Managing risk is a risky business. Chapman and Ward provide an in-depth explanation of why it is important to understand and manage underlying uncertainty in all its forms, in order to realise opportunities more fully and enhance corporate performance. They show what best practice should look like. The implications go well beyond the conventional wisdom of project risk management, providing an enl

  1. Relacionamento entre gerenciamento de risco e sucesso de projetos Relationship between risk management and project success

    Directory of Open Access Journals (Sweden)

    Roque Rabechini Junior

    2012-01-01

    Full Text Available Este trabalho apresenta os resultados de uma pesquisa feita em quatro estados brasileiros sobre adoção de práticas de gerenciamento de riscos em projetos com diferentes tipos de complexidade. A pesquisa de campo envolveu 415 projetos de nove setores econômicos distintos. O material obtido foi coletado por meio de questionário aplicado em gerentes e membros de equipe de projetos. Os resultados mostraram que há impacto significativo e positivo da adoção de práticas de gerenciamento de riscos no sucesso dos projetos. Mostrou também que há dependência entre percepção de sucesso e presença/ausência de gerente de risco, havendo impacto positivo da presença do gerente de risco no sucesso dos projetos. As principais limitações da pesquisa concernem às escolhas metodológicas de amostra não probabilística, empregando questionário baseado na percepção dos respondentes. O trabalho originalmente integra a visão de práticas de gerenciamento de riscos com resultados em projetos, servindo de base para novos estudos em outros setores e áreas de conhecimento de projetos.This paper presents the results of an investigation in four Brazilian States on the adoption of Risk Management practices in projects with different complexity levels. The field research involved 415 projects from nine different economic sectors. Data was gathered through a questionnaire applied to managers and project team members. Results showed that there are significant and positive impacts in the adoption of Risk Management practices on project success. It also showed that there is dependence between perceived success and the presence/absence of a risk manager, i.e., the presence of a risk manager has positive impacts on project success. The major limitation of this study concerns the methodological choice: non-probability sample survey based on respondents perception. The work promotes the integration between Risk Management practices and projects performance

  2. Value of Uncertainty: The Lost Opportunities in Large Projects

    Directory of Open Access Journals (Sweden)

    Agnar Johansen

    2016-08-01

    Full Text Available The uncertainty management theory has become well established over the last 20–30 years. However, the authors suggest that it does not fully address why opportunities often remain unexploited. Empirical studies show a stronger focus on mitigating risks than exploiting opportunities. This paper therefore addresses why so few opportunities are explored in large projects. The theory claims that risks and opportunities should be equally managed in the same process. In two surveys, conducted in six (private and public companies over a four-year period, project managers stated that uncertainty management is about managing risk and opportunities. However, two case studies from 12 projects from the same companies revealed that all of them had their main focus on risks, and most of the opportunities were left unexploited. We have developed a theoretical explanation model to shed light on this phenomena. The concept is a reflection based on findings from our empirical data up against current project management, uncertainty, risk and stakeholder literature. Our model shows that the threshold for pursuing a potential opportunity is high. If a potential opportunity should be considered, it must be extremely interesting, since it may require contract changes, and the project must abandon an earlier-accepted best solution.

  3. Estimating the financial risks of Andropogon gayanus to greenhouse gas abatement projects in northern Australia

    Science.gov (United States)

    Adams, Vanessa M.; Setterfield, Samantha A.

    2013-06-01

    Financial mechanisms such as offsets are one strategy to abate greenhouse gas emissions, and the carbon market is expanding with a growing demand for offset products. However, in the case of carbon offsets, if the carbon is released due to intentional or unintentional reversal through environmental events such as fire, the financial liability to replace lost offsets will likely fall on the provider. This liability may have implications for future participation in programmes, but common strategies such as buffer pool and insurance products can be used to minimize this liability. In order for these strategies to be effective, an understanding of the spatial and temporal distributions of expected reversals is needed. We use the case study of savanna burning, an approved greenhouse gas abatement methodology under the Carbon Farming Initiative in Australia, to examine potential risks to carbon markets in northern Australia and quantify the financial risks. We focus our analysis on the threat of Andropogon gayanus (gamba grass) to savanna burning due to its documented impacts of increased fuel loads and altered fire regimes. We assess the spatial and financial extent to which gamba grass poses a risk to savanna burning programmes in northern Australia. We find that 75% of the eligible area for savanna burning is spatially coincident with the high suitability range for gamba grass. Our analysis demonstrates that the presence of gamba grass seriously impacts the financial viability of savanna burning projects. For example, in order to recuperate the annual costs of controlling 1 ha of gamba grass infestation, 290 ha of land must be enrolled in annual carbon abatement credits. Our results show an immediate need to contain gamba grass to its current extent to avoid future spread into large expanses of land, which are currently profitable for savanna burning.

  4. Estimating the financial risks of Andropogon gayanus to greenhouse gas abatement projects in northern Australia

    International Nuclear Information System (INIS)

    Adams, Vanessa M; Setterfield, Samantha A

    2013-01-01

    Financial mechanisms such as offsets are one strategy to abate greenhouse gas emissions, and the carbon market is expanding with a growing demand for offset products. However, in the case of carbon offsets, if the carbon is released due to intentional or unintentional reversal through environmental events such as fire, the financial liability to replace lost offsets will likely fall on the provider. This liability may have implications for future participation in programmes, but common strategies such as buffer pool and insurance products can be used to minimize this liability. In order for these strategies to be effective, an understanding of the spatial and temporal distributions of expected reversals is needed. We use the case study of savanna burning, an approved greenhouse gas abatement methodology under the Carbon Farming Initiative in Australia, to examine potential risks to carbon markets in northern Australia and quantify the financial risks. We focus our analysis on the threat of Andropogon gayanus (gamba grass) to savanna burning due to its documented impacts of increased fuel loads and altered fire regimes. We assess the spatial and financial extent to which gamba grass poses a risk to savanna burning programmes in northern Australia. We find that 75% of the eligible area for savanna burning is spatially coincident with the high suitability range for gamba grass. Our analysis demonstrates that the presence of gamba grass seriously impacts the financial viability of savanna burning projects. For example, in order to recuperate the annual costs of controlling 1 ha of gamba grass infestation, 290 ha of land must be enrolled in annual carbon abatement credits. Our results show an immediate need to contain gamba grass to its current extent to avoid future spread into large expanses of land, which are currently profitable for savanna burning. (letter)

  5. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  6. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  7. Estimating NOA Health Risks from Selected Construction Activities at the Calaveras Dam Replacement Project (CDRP)

    Science.gov (United States)

    Hernandez, D. W.

    2012-12-01

    The CDRP is a major construction project involving up to 400 workers using heavy earth moving equipment, blasting, drilling, rock crushing, and other techniques designed to move 7 million yards of earth. Much of this material is composed of serpentinite, blueschist, and other rocks that contain chrysotile, crocidolite, actinolite, tremolite, and Libby-class amphiboles. To date, over 1,000 personal, work area, and emission inventory related samples have been collected and analyzed by NIOSH 7400, NIOSH 7402, and CARB-AHERA methodology. Data indicate that various CDRP construction activities have the potential to generate significant mineral fibers and structures that could represent elevated on site and off site health risks. This presentation will review the Contractors air monitoring program for this major project, followed by a discussion of predictive methods to evaluate potential onsite and offsite risks. Ultimately, the data are used for planning control strategies designed to achieve a Project Action Level of 0.01 f/cc (one tenth the Cal/OSHA PEL) and risk-based offsite target levels.

  8. Flash flood forecasting, warning and risk management: the HYDRATE project

    International Nuclear Information System (INIS)

    Borga, M.; Anagnostou, E.N.; Bloeschl, G.; Creutin, J.-D.

    2011-01-01

    Highlights: → We characterize flash flood events in various regions of Europe. → We provide guidance to improve observations and monitoring of flash floods. → Flash floods are associated to orography and are influenced by initial soil moisture conditions. → Models for flash flood forecasting and flash flood hazard assessment are illustrated and discussed. → We examine implications for flood risk policy and discuss recommendations received from end users. - Abstract: The management of flash flood hazards and risks is a critical component of public safety and quality of life. Flash-floods develop at space and time scales that conventional observation systems are not able to monitor for rainfall and river discharge. Consequently, the atmospheric and hydrological generating mechanisms of flash-floods are poorly understood, leading to highly uncertain forecasts of these events. The objective of the HYDRATE project has been to improve the scientific basis of flash flood forecasting by advancing and harmonising a European-wide innovative flash flood observation strategy and developing a coherent set of technologies and tools for effective early warning systems. To this end, the project included actions on the organization of the existing flash flood data patrimony across Europe. The final aim of HYDRATE was to enhance the capability of flash flood forecasting in ungauged basins by exploiting the extended availability of flash flood data and the improved process understanding. This paper provides a review of the work conducted in HYDRATE with a special emphasis on how this body of research can contribute to guide the policy-life cycle concerning flash flood risk management.

  9. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk

  10. The Risk Evaluation of Agricultural High-tech Investment Project%农业高新技术投资项目风险评价

    Institute of Scientific and Technical Information of China (English)

    陆迁; 苗姗姗

    2005-01-01

    The agricultural high-tech investment project (AHIP) is characterized by technology-intensive, high risk and great profit. This article analyzes essential factors of the risks of the agricultural high-tech investment projects and the traditional risk evaluation method of agricultural projects. We think that the applications of the sensitivity analysis and probability are defective. Therefore, this article introduces a structural model to evaluate the risks of the agricultural high-tech investment projects and the system of the concrete evaluation indexes.

  11. The WEST project: Current status of the ITER-like tungsten divertor

    International Nuclear Information System (INIS)

    Missirlian, M.; Bucalossi, J.; Corre, Y.; Ferlay, F.; Firdaouss, M.; Garin, P.; Grosman, A.; Guilhem, D.; Gunn, J.; Languille, P.; Lipa, M.; Richou, M.; Tsitrone, E.

    2014-01-01

    Highlights: • We presented the ITER-like W components occurred for the WEST divertor. • The main features including key elements of the design were detailed. • The main results of studies investigating the integration constraints or issues were reported. • The WEST ITER-like divertor design reached a mature stage to enable the launching of the procurement phase. - Abstract: The WEST (W – for tungsten – Environment in Steady-state Tokamak) project is an upgrade of Tore Supra from a limiter based tokamak with carbon PFCs into an X-point divertor tokamak with full-tungsten armour while keeping its long discharge capability. The WEST project will primarily offer the key capability of testing for the first time the ITER technology in real plasma environment. In particular, the main divertor (i.e. the lower divertor) of the WEST project will be based on actively cooled tungsten monoblock components and will follow as closely as possible the design and the assembling technology, foreseen for the ITER divertor units. The current design of WEST ITER-like tungsten divertor has now reached a mature stage following the 2013 WEST Final Design Review. This paper presents the key elements of the design, reports the technological requirements and reviews the main design and integration issues

  12. The WEST project: Current status of the ITER-like tungsten divertor

    Energy Technology Data Exchange (ETDEWEB)

    Missirlian, M., E-mail: marc.missirlian@cea.fr; Bucalossi, J.; Corre, Y.; Ferlay, F.; Firdaouss, M.; Garin, P.; Grosman, A.; Guilhem, D.; Gunn, J.; Languille, P.; Lipa, M.; Richou, M.; Tsitrone, E.

    2014-10-15

    Highlights: • We presented the ITER-like W components occurred for the WEST divertor. • The main features including key elements of the design were detailed. • The main results of studies investigating the integration constraints or issues were reported. • The WEST ITER-like divertor design reached a mature stage to enable the launching of the procurement phase. - Abstract: The WEST (W – for tungsten – Environment in Steady-state Tokamak) project is an upgrade of Tore Supra from a limiter based tokamak with carbon PFCs into an X-point divertor tokamak with full-tungsten armour while keeping its long discharge capability. The WEST project will primarily offer the key capability of testing for the first time the ITER technology in real plasma environment. In particular, the main divertor (i.e. the lower divertor) of the WEST project will be based on actively cooled tungsten monoblock components and will follow as closely as possible the design and the assembling technology, foreseen for the ITER divertor units. The current design of WEST ITER-like tungsten divertor has now reached a mature stage following the 2013 WEST Final Design Review. This paper presents the key elements of the design, reports the technological requirements and reviews the main design and integration issues.

  13. Hanford Waste Vitrification Project Building limited scope risk assessment

    International Nuclear Information System (INIS)

    Braun, D.J.; Lindberg, S.E.; Reardon, M.F.; Wilson, G.P.

    1992-10-01

    A limited scope risk assessment was performed on the preliminary design of a high-level waste interim storage facility. The Canister Storage Building (CSB) facility will be built to support remediation at the US Department of Energy Hanford Site in Washington State. The CSB will be part of the support facilities for a high level Hanford Waste Vitrification Plant (HWVP). The limited scope risk assessment is based on a preliminary design which uses forced air circulation systems to move air through the building vault. The current building design calls for natural circulation to move air through the building vault

  14. Agent-Based Simulations for Project Management

    Science.gov (United States)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  15. European seismological data exchange, access and processing: current status of the Research Infrastructure project NERIES

    Science.gov (United States)

    Giardini, D.; van Eck, T.; Bossu, R.; Wiemer, S.

    2009-04-01

    The EC Research infrastructure project NERIES, an Integrated Infrastructure Initiative in seismology for 2006-2010 has passed its mid-term point. We will present a short concise overview of the current state of the project, established cooperation with other European and global projects and the planning for the last year of the project. Earthquake data archiving and access within Europe has dramatically improved during the last two years. This concerns earthquake parameters, digital broadband and acceleration waveforms and historical data. The Virtual European Broadband Seismic Network (VEBSN) consists currently of more then 300 stations. A new distributed data archive concept, the European Integrated Waveform Data Archive (EIDA), has been implemented in Europe connecting the larger European seismological waveform data. Global standards for earthquake parameter data (QuakeML) and tomography models have been developed and are being established. Web application technology has been and is being developed to make a jump start to the next generation data services. A NERIES data portal provides a number of services testing the potential capacities of new open-source web technologies. Data application tools like shakemaps, lossmaps, site response estimation and tools for data processing and visualisation are currently available, although some of these tools are still in an alpha version. A European tomography reference model will be discussed at a special workshop in June 2009. Shakemaps, coherent with the NEIC application, are implemented in, among others, Turkey, Italy, Romania, Switzerland, several countries. The comprehensive site response software is being distributed and used both inside and outside the project. NERIES organises several workshops inviting both consortium and non-consortium participants and covering a wide range of subjects: ‘Seismological observatory operation tools', ‘Tomography', ‘Ocean bottom observatories', 'Site response software training

  16. Current situation of the project of 3. and 4. block of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Suchy, L.

    2006-01-01

    The contribution shows the basic information about the crucial milestone of 3. building and the current situation of the project of 3. and 4. block of the nuclear power plant Mochovce. Contribution also shows what activities were realized and what material in area of designation of the technical and safety standard of the project was elaborated in the past, the main activities planned for 2006 have been described, support for Feasibility Study elaborated by ENEL and description of the integrated management system. The basic thesis crucial for the next steps on the project of 3. and 4. block of Nuclear Power Plant Mochovce is presented in the conclusion

  17. Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.

  18. Results of expert response when forming an exhaustive list of potential risks of constructions projects using energy efficient technologies

    Directory of Open Access Journals (Sweden)

    Ryzhkova Anastasiya Igorevna

    2016-10-01

    Full Text Available The author deals with the most widely used methods of risk events identification. The expert response method is most applicable for construction projects using energy efficient technologies. The article presents the results of an opinion poll of the professional expert community using expert response method, which is aimed to identify the most likely potential “pure” risk of construction projects with energy-efficient technologies in use. 74 experts representing different levels of the construction process were polled: customers and directors of construction companies, project managers, risk managers, advisors. The answers were collected during private talks and also using a special website Survey Monkey. Experts from different countries took part: Russia, Great Britain, Austria, Luxemburg, Switzerland and Norway. Also the article presents the expert evaluation of the “effect” of risk implementation on the cost of a project, implementation time, the product quality, the environment and safety on the construction site.

  19. Modifiable risk factors of ecstasy use: risk perception, current dependence, perceived control, and depression

    Science.gov (United States)

    Leung, Kit Sang; Ben Abdallah, Arbi; Cottler, Linda B.

    2009-01-01

    Risk perception, perceived behavioral control of obtaining ecstasy (PBC-obtaining), current ecstasy dependence, and recent depression have been associated with past ecstasy use, however, their utility in predicting ecstasy use has not been demonstrated. This study aimed to determine whether these four modifiable risk factors could predict ecstasy use after controlling for socio-demographic covariates and recent polydrug use. Data from 601 ecstasy users in the National Institute on Drug Abuse funded TriCity Study of Club Drug Use, Abuse and Dependence were analyzed using multivariate logistic regression. Participants were interviewed twice within a 2-week period using standardized instruments. Thirteen percent (n=80) of the participants reported using ecstasy between the two interviews. Low risk perception, high PBC-obtaining (an estimated ecstasy procurement time ecstasy dependence were statistically associated with ecstasy use between the two interviews. Recent depression was not a significant predictor. Despite not being a target predictor, recent polydrug use was also statistically associated with ecstasy use. The present findings may inform the development of interventions targeting ecstasy users. PMID:19880258

  20. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    Science.gov (United States)

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  1. Reviews on current carbon emission reduction technologies and projects and their feasibilities on ships

    Science.gov (United States)

    Wang, Haibin; Zhou, Peilin; Wang, Zhongcheng

    2017-06-01

    Concern about global climate change is growing, and many projects and researchers are committed to reducing greenhouse gases from all possible sources. International Maritime (IMO) has set a target of 20% CO2 reduction from shipping by 2020 and also presented a series of carbon emission reduction methods, which are known as Energy Efficiency Design Index (EEDI) and Energy Efficiency Operation Indicator (EEOI). Reviews on carbon emission reduction from all industries indicate that, Carbon Capture and Storage (CCS) is an excellent solution to global warming. In this paper, a comprehensive literature review of EEDI and EEOI and CCS is conducted and involves reviewing current policies, introducing common technologies, and considering their feasibilities for marine activities, mainly shipping. Current projects are also presented in this paper, thereby illustrating that carbon emission reduction has been the subject of attention from all over the world. Two case ship studies indicate the economic feasibility of carbon emission reduction and provide a guide for CCS system application and practical installation on ships.

  2. Projected lifetime cancer risks from exposure to regional radioactive fallout in the Marshall Islands.

    Science.gov (United States)

    Land, Charles E; Bouville, André; Apostoaei, Iulian; Simon, Steven L

    2010-08-01

    Radioactive fallout from nuclear test detonations during 1946-1958 at Bikini and Enewetak Atolls in the Marshall Islands (MI) exposed populations living elsewhere in the MI archipelago. A comprehensive analysis, presented in seven companion papers, has produced estimates of tissue-specific radiation absorbed dose to MI residents at all historically inhabited atolls from internal (ingested) and external irradiation resulting from exposure to radioactive fallout, by calendar year, and by age of the population at time of exposure. The present report deals, for the first time, with the implications of these doses for cancer risk among exposed members of the MI population. Radiation doses differed by geographic location and year of birth, and radiation-related cancer risk depends upon age at exposure and age at observation for risk. Using dose-response models based on committee reports published by the National Research Council and the National Institutes of Health, we project that, during the lifetimes of members of the MI population potentially exposed to ionizing radiation from weapons test fallout deposited during the testing period (1948-1958) and from residual radioactive sources during the subsequent 12 y (1959-1970), perhaps 1.6% (with 90% uncertainty range 0.4% to 3.4%) of all cancers might be attributable to fallout-related radiation exposures. By sub-population, the projected proportion of cancers attributable to radiation from fallout from all nuclear tests conducted in the Marshall Islands is 55% (28% to 69%) among 82 persons exposed in 1954 on Rongelap and Ailinginae, 10% (2.4% to 22%) for 157 persons exposed on Utrik, and 2.2% (0.5% to 4.8%) and 0.8% (0.2% to 1.8%), respectively, for the much larger populations exposed in mid-latitude locations including Kwajalein and in southern locations including Majuro. By cancer type, point estimates of attributable risk varied, by location, between 12% and 95% for thyroid cancer, between 2% and 78% for leukemia, and

  3. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  4. The clinical endocrinology workforce: current status and future projections of supply and demand.

    Science.gov (United States)

    Vigersky, Robert A; Fish, Lisa; Hogan, Paul; Stewart, Andrew; Kutler, Stephanie; Ladenson, Paul W; McDermott, Michael; Hupart, Kenneth H

    2014-09-01

    Many changes in health care delivery, health legislation, and the physician workforce that affect the supply and demand for endocrinology services have occurred since the first published workforce study of adult endocrinologists in 2003. The objective of the study was to assess the current adult endocrinology workforce data and provide the first analysis of the pediatric endocrinology workforce and to project the supply of and demand for endocrinologists through 2025. A workforce model was developed from an analysis of proprietary and publicly available databases, consultation with a technical expert panel, and the results of an online survey of board-certified endocrinologists. The Endocrine Society commissioned The Lewin Group to estimate current supply and to project gaps between supply and demand for endocrinologists. A technical expert panel of senior endocrinologists provided context, clinical information, and direction. The following were measured: 1) the current adult and pediatric endocrinology workforce and the supply of and demand for endocrinologists through 2025 and 2) the number of additional entrants into the endocrinology work pool that would be required to close the gap between supply and demand. Currently there is a shortage of approximately 1500 adult and 100 pediatric full-time equivalent endocrinologists. The gap for adult endocrinologists will expand to 2700 without an increase in the number of fellows trained. An increase in the prevalence of diabetes mellitus further expands the demand for adult endocrinologists. The gap can be closed in 5 and 10 years by increasing the number of fellowship positions by 14.4% and 5.5% per year, respectively. The gap between supply and demand for pediatric endocrinologists will close by 2016, and thereafter an excess supply over demand will develop at the current rate of new entrants into the work force. There are insufficient adult endocrinologists to satisfy current and future demand. A number of proactive

  5. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    OpenAIRE

    Jovanović Filip P.; Berić Ivana M.; Jovanović Petar M.; Jovanović Aca D.

    2016-01-01

    This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reductio...

  6. Design optimization of 600 A-13 kA current leads for the Large Hadron Collider project at CERN

    CERN Document Server

    Spiller, D M; Al-Mosawl, M K; Friend, C M; Thacker, P; Ballarino, A

    2001-01-01

    The requirements of the Large Hadron Collider project at CERN for high-temperature superconducting (HTS) current leads have been widely publicized. CERN require hybrid current leads of resistive and HTS materials with current ratings of 600 A, 6 kA and 13 kA. BICC General Superconductors, in collaboration with the University of Southampton, have developed and manufactured prototype current leads for the Large Hadron Collider project. The resistive section consists of a phosphorus de-oxidized copper conductor and heat exchanger and the HTS section is constructed from BICC General's (Pb, Bi)2223 tapes with a reduced thermal conductivity Ag alloy sheath. We present the results of the materials optimization studies for the resistive and the HTS sections. Some results of the acceptance tests at CERN are discussed. (9 refs).

  7. NASA's Current and Next Generation Coastal Remote Sensing Missions and Coral Reef Projects.

    Science.gov (United States)

    Guild, Liane S.

    2015-01-01

    The LLILAS Faculty Research Initiative presents a two-day symposium, Caribbean Coral Reefs at Risk. This international symposium examines the current state and future of coral reef conservation efforts throughout the Caribbean from the perspective of government agencies, nongovernment organizations, and academia.

  8. High-school software development project helps increasing students' awareness of geo-hydrological hazards and their risks

    Science.gov (United States)

    Marchesini, Ivan; Rossi, Mauro; Balducci, Vinicio; Salvati, Paola; Guzzetti, Fausto; Bianchini, Andrea; Grzeleswki, Emanuell; Canonico, Andrea; Coccia, Rita; Fiorucci, Gianni Mario; Gobbi, Francesca; Ciuchetti, Monica

    2015-04-01

    In Italy, inundation and landslides are widespread phenomena that impact the population and cause significant economic damage to private and public properties. The perception of the risk posed by these natural geo-hydrological hazards varies geographically and in time. The variation in the perception of the risks has negative consequences on risk management, and limits the adoption of effective risk reduction strategies. We maintain that targeted education can foster the understanding of geo-hydrological hazards, improving their perception and the awareness of the associated risk. Collaboration of a research center experienced in geo-hydrological hazards and risks (CNR IRPI, Perugia) and a high school (ITIS Alessandro Volta, Perugia) has resulted in the design and execution of a project aimed at improving the perception of geo-hydrological risks in high school students and teachers through software development. In the two-year project, students, high school teachers and research scientists have jointly developed software broadly related to landslide and flood hazards. User requirements and system specifications were decided to facilitate the distribution and use of the software among students and their peers. This allowed a wider distribution of the project results. We discuss two prototype software developed by the high school students, including an application of augmented reality for improved dissemination of information of landslides and floods with human consequences in Italy, and a crowd science application to allow students (and others, including their families and friends) to collect information on landslide and flood occurrence exploiting modern mobile devices. This information can prove important e.g., for the validation of landslide forecasting models.

  9. Medical Data Architecture (MDA) Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Gurram, M.; Wolfe, S.; Marker, N.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2018-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm. The medical system requirements are being developed in parallel with the exploration mission architecture and vehicle design. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products supported by current prototype development will directly inform exploration medical system requirements.

  10. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Directory of Open Access Journals (Sweden)

    Sam Nicol

    Full Text Available Environmental impact assessment (EIA is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  11. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  12. New risk metrics and mathematical tools for risk analysis: Current and future challenges

    International Nuclear Information System (INIS)

    Skandamis, Panagiotis N.; Andritsos, Nikolaos; Psomas, Antonios; Paramythiotis, Spyridon

    2015-01-01

    The current status of the food safety supply world wide, has led Food and Agriculture Organization (FAO) and World Health Organization (WHO) to establishing Risk Analysis as the single framework for building food safety control programs. A series of guidelines and reports that detail out the various steps in Risk Analysis, namely Risk Management, Risk Assessment and Risk Communication is available. The Risk Analysis approach enables integration between operational food management systems, such as Hazard Analysis Critical Control Points, public health and governmental decisions. To do that, a series of new Risk Metrics has been established as follows: i) the Appropriate Level of Protection (ALOP), which indicates the maximum numbers of illnesses in a population per annum, defined by quantitative risk assessments, and used to establish; ii) Food Safety Objective (FSO), which sets the maximum frequency and/or concentration of a hazard in a food at the time of consumption that provides or contributes to the ALOP. Given that ALOP is rather a metric of the public health tolerable burden (it addresses the total ‘failure’ that may be handled at a national level), it is difficult to be interpreted into control measures applied at the manufacturing level. Thus, a series of specific objectives and criteria for performance of individual processes and products have been established, all of them assisting in the achievement of FSO and hence, ALOP. In order to achieve FSO, tools quantifying the effect of processes and intrinsic properties of foods on survival and growth of pathogens are essential. In this context, predictive microbiology and risk assessment have offered an important assistance to Food Safety Management. Predictive modelling is the basis of exposure assessment and the development of stochastic and kinetic models, which are also available in the form of Web-based applications, e.g., COMBASE and Microbial Responses Viewer), or introduced into user

  13. New risk metrics and mathematical tools for risk analysis: Current and future challenges

    Energy Technology Data Exchange (ETDEWEB)

    Skandamis, Panagiotis N., E-mail: pskan@aua.gr; Andritsos, Nikolaos, E-mail: pskan@aua.gr; Psomas, Antonios, E-mail: pskan@aua.gr; Paramythiotis, Spyridon, E-mail: pskan@aua.gr [Laboratory of Food Quality Control and Hygiene, Department of Food Science and Technology, Agricultural University of Athens, Iera Odos 75, 118 55, Athens (Greece)

    2015-01-22

    The current status of the food safety supply world wide, has led Food and Agriculture Organization (FAO) and World Health Organization (WHO) to establishing Risk Analysis as the single framework for building food safety control programs. A series of guidelines and reports that detail out the various steps in Risk Analysis, namely Risk Management, Risk Assessment and Risk Communication is available. The Risk Analysis approach enables integration between operational food management systems, such as Hazard Analysis Critical Control Points, public health and governmental decisions. To do that, a series of new Risk Metrics has been established as follows: i) the Appropriate Level of Protection (ALOP), which indicates the maximum numbers of illnesses in a population per annum, defined by quantitative risk assessments, and used to establish; ii) Food Safety Objective (FSO), which sets the maximum frequency and/or concentration of a hazard in a food at the time of consumption that provides or contributes to the ALOP. Given that ALOP is rather a metric of the public health tolerable burden (it addresses the total ‘failure’ that may be handled at a national level), it is difficult to be interpreted into control measures applied at the manufacturing level. Thus, a series of specific objectives and criteria for performance of individual processes and products have been established, all of them assisting in the achievement of FSO and hence, ALOP. In order to achieve FSO, tools quantifying the effect of processes and intrinsic properties of foods on survival and growth of pathogens are essential. In this context, predictive microbiology and risk assessment have offered an important assistance to Food Safety Management. Predictive modelling is the basis of exposure assessment and the development of stochastic and kinetic models, which are also available in the form of Web-based applications, e.g., COMBASE and Microbial Responses Viewer), or introduced into user

  14. New risk metrics and mathematical tools for risk analysis: Current and future challenges

    Science.gov (United States)

    Skandamis, Panagiotis N.; Andritsos, Nikolaos; Psomas, Antonios; Paramythiotis, Spyridon

    2015-01-01

    The current status of the food safety supply world wide, has led Food and Agriculture Organization (FAO) and World Health Organization (WHO) to establishing Risk Analysis as the single framework for building food safety control programs. A series of guidelines and reports that detail out the various steps in Risk Analysis, namely Risk Management, Risk Assessment and Risk Communication is available. The Risk Analysis approach enables integration between operational food management systems, such as Hazard Analysis Critical Control Points, public health and governmental decisions. To do that, a series of new Risk Metrics has been established as follows: i) the Appropriate Level of Protection (ALOP), which indicates the maximum numbers of illnesses in a population per annum, defined by quantitative risk assessments, and used to establish; ii) Food Safety Objective (FSO), which sets the maximum frequency and/or concentration of a hazard in a food at the time of consumption that provides or contributes to the ALOP. Given that ALOP is rather a metric of the public health tolerable burden (it addresses the total `failure' that may be handled at a national level), it is difficult to be interpreted into control measures applied at the manufacturing level. Thus, a series of specific objectives and criteria for performance of individual processes and products have been established, all of them assisting in the achievement of FSO and hence, ALOP. In order to achieve FSO, tools quantifying the effect of processes and intrinsic properties of foods on survival and growth of pathogens are essential. In this context, predictive microbiology and risk assessment have offered an important assistance to Food Safety Management. Predictive modelling is the basis of exposure assessment and the development of stochastic and kinetic models, which are also available in the form of Web-based applications, e.g., COMBASE and Microbial Responses Viewer), or introduced into user-friendly softwares

  15. Sovereign Risk and Currently Returns

    DEFF Research Database (Denmark)

    Della Corte, Pasquale; Sarno, Lucio; Schmeling, Maik

    We empirically investigate the relation between sovereign risk and exchange rates for a broad set of currencies. An increase in the credit default swap (CDS) spread of a country is accompanied by a significant depreciation of the exchange rate. More generally, CDS spread changes have substantial...... explanatory power for currency returns which is largely driven by shocks to global credit risk. Consistent with the notion that sovereign risk is priced, we find that a country's exposure to global credit risk forecasts excess returns to trading exchange rates as well as to trading on the volatility, skewness...

  16. Risk of high-risk human papillomavirus infection and cervical precancerous lesions with past or current trichomonas infection: a pooled analysis of 25,054 women in rural China.

    Science.gov (United States)

    Feng, Rui-Mei; Z Wang, Margaret; Smith, Jennifer S; Dong, Li; Chen, Feng; Pan, Qin-Jing; Zhang, Xun; Qiao, You-Lin; Zhao, Fang-Hui

    Trichomonas vaginitis (TV) infection has obviously been implicated in gynecological morbidity but still unclear in cervical lesions. To evaluate the risk of hr-HPV infection and cervical intraepithelial neoplasia grade 2 or worse (CIN2 + ) by TV infection. The pooled study was conducted among 12 population-based, cervical cancer screening studies throughout China (N = 24,054). HPV was detected by Hybrid Capture ® 2 (HC2) test. Past TV infection was measured by self-reporting, current TV infection was diagnosed by liquid-based cytology (LBC), cervical lesions was diagnosed by histopathology. Respective prevalence of hr-HPV and CIN2+ were 17.4% and 3.3%. Out of 24,054 women, 14.6% reported past TV infection, and out of 11,853 women, 9.9% had current TV infection. Current TV-positive women had an increased risk for hr-HPV (OR 1.31, 95%CI: 1.11-1.56). The risk of CIN2+ decreased for hr-HPV positive women with current TV infection (adjusted OR 0.50, 95% CI: 0.30-0.84) and past TV infection (adjusted OR 0.68, 95% CI: 0.54-0.86). Among hr-HPV negative women, no significant associations were observed between past or current TV infection and risk of CIN2+. Women infected with HPV are more likely to be infected by other types of sexually transmitted diseases. Current TV-positive women had an increased risk for hr-HPV infection compared to currently TV-negative women. Both past and current TV-positive women had a decreased risk for CIN2+, especially among high-risk HPV positive women. More direct investigation into the interaction between TV, HPV, inflammatory signals, and risk of carcinogenesis are further needed. Copyright © 2017. Published by Elsevier B.V.

  17. Pulmonary arterial hypertension: tailoring treatment to risk in the current era

    Directory of Open Access Journals (Sweden)

    Sean Gaine

    2017-12-01

    Full Text Available Recent advances in the treatment of pulmonary arterial hypertension (PAH have led to improved patient outcomes. Multiple PAH therapies are now available and optimising the use of these drugs in clinical practice is vital. In this review, we discuss the management of PAH patients in the context of current treatment guidelines and supporting clinical evidence. In clinical practice, considerable emphasis is placed on the importance of making treatment decisions guided by each patient's risk status, which should be assessed using multiple prognostic parameters. As PAH is a progressive disease, regular assessments are essential to ensure that any change in risk is detected in a timely manner and treatment is adjusted accordingly. With the availability of therapies that target three different pathogenic pathways, combination therapy is now the standard of care. For most patients, this involves dual combination therapy with agents targeting the endothelin and nitric oxide pathways. Therapies targeting the prostacyclin pathway should be added for patients receiving dual combination therapy who do not achieve a low-risk status. There is also a need for a holistic approach to treatment beyond pharmacological therapies. Implementation of all these approaches will ensure that PAH patients receive maximal benefit from currently available therapies.

  18. Current Status of the LOFAR EoR Key Science Project

    Science.gov (United States)

    Koopmans, L. V. E.; LOFAR EoR KSP Team

    2018-05-01

    A short status update on the LOFAR Epoch of Reionization (EoR) Key Science Project (KSP) is given, regarding data acquisition, data processing and analysis, and current power-spectrum limits on the redshifted 21-cm signal of neutral hydrogen at redshifts z = 8 - 10. With caution, we present a preliminary astrophysical analysis of ~60 hr of processed LOFAR data and their resulting power spectrum, showing that potentially already interesting limits on X-ray heating during the Cosmic Dawn can already be gained. This is by no means the final analysis of this sub-set of data, but illustrates the future potential when all nearly 3000 hr of data in hand on two EoR windows will have been processed.

  19. Formation of the portfolio of high-rise construction projects on the basis of optimization of «risk-return» rate

    Science.gov (United States)

    Uvarova, Svetlana; Kutsygina, Olga; Smorodina, Elena; Gumba, Khuta

    2018-03-01

    The effectiveness and sustainability of an enterprise are based on the effectiveness and sustainability of its portfolio of projects. When creating a production program for a construction company based on a portfolio of projects and related to the planning and implementation of initiated organizational and economic changes, the problem of finding the optimal "risk-return" ratio of the program (portfolio of projects) is solved. The article proposes and approves the methodology of forming a portfolio of enterprise projects on the basis of the correspondence principle. Optimization of the portfolio of projects on the criterion of "risk-return" also contributes to the company's sustainability.

  20. Transcranial alternating current stimulation (tACS increases risk taking behavior in the Balloon Analogue Risk Task

    Directory of Open Access Journals (Sweden)

    Tal eSela

    2012-02-01

    Full Text Available The process of evaluating risks and benefits involves a complex neural network that includes the dorsolateral prefrontal cortex (DLPFC. It has been proposed that in conflict and reward situations, theta-band (4–8 Hz oscillatory activity in the frontal cortex may reflect an electrophysiological mechanism for coordinating neural networks monitoring behavior, as well as facilitating task-specific adaptive changes. The goal of the present study was to investigate the hypothesis that theta-band oscillatory balance between right and left frontal and prefrontal regions, with a predominance role to the right hemisphere, is crucial for regulatory control during decision-making under risk. In order to explore this hypothesis, we used transcranial Alternating Current Stimulation (tACS, a novel technique that provides the opportunity to explore the functional role of neuronal oscillatory activities and to establish a causal link between specific oscillations and functional lateralization in risky decision-making situations. For this aim, healthy participants were randomly allocated to one of three stimulation groups (LH stimulation / RH stimulation / Sham stimulation, with active AC stimulation delivered in a frequency-dependent manner (at 6.5 Hz; 1mA peak to-peak. During the AC stimulation, participants performed the Balloon Analog Risk Task. This experiment revealed that participants receiving LH stimulation displayed riskier decision-making style compared to sham and RH stimulation groups. However, there was no difference in decision-making behaviors between sham and RH stimulation groups. The current study extends the notion that DLPFC activity is critical for adaptive decision-making in the context of risk-taking and emphasis the role of theta-band oscillatory activity during risky decision-making situations.

  1. Minimizing Investment Risk of Integrated Rail and Transit-Oriented-Development Projects over Years in a Linear Monocentric City

    Directory of Open Access Journals (Sweden)

    Ding Liu

    2016-01-01

    Full Text Available Rail and transit-oriented-development (TOD projects are simultaneously optimized in this paper, with special consideration given to yearly variation and spatial and temporal correlation of population densities. In the proposed model, the objective is to minimize the investment risk of integrated rail and TOD projects with a given required expected return on investment. The investment risk is optimized based on closed-form solutions of the design variables, including rail line length, the number of TOD projects, and the number of housing units in each TOD project. The closed-form solutions are given explicitly under the assumption of social welfare maximization. It is found that underestimation exists for rail and TOD projects without consideration of the correlation of spatial and temporal population densities. TOD projects can greatly improve the return on investment of the rail operator. A numerical example is also presented.

  2. Current outcomes and risk factors for the Norwood procedure.

    Science.gov (United States)

    Stasik, Chad N; Gelehrter, S; Goldberg, Caren S; Bove, Edward L; Devaney, Eric J; Ohye, Richard G

    2006-02-01

    Tremendous strides have been made in the outcomes for hypoplastic left heart syndrome and other functional single-ventricle malformations over the past 25 years. This progress relates primarily to improvements in survival for patients undergoing the Norwood procedure. Previous reports on risk factors have been on smaller groups of patients or collected over relatively long periods of time, during which management has evolved. We analyzed our current results for the Norwood procedure with attention to risk factors for poor outcome. A single-institution review of all patients undergoing a Norwood procedure for a single-ventricle malformation from May 1, 2001, through April 30, 2003, was performed. Patient demographics, anatomy, clinical condition, associated anomalies, operative details, and outcomes were recorded. Of the 111 patients, there were 23 (21%) hospital deaths. Univariate analysis revealed noncardiac abnormalities (genetic or significant extracardiac diagnosis, P = .0018), gestational age (P = .03), diagnosis of unbalanced atrioventricular septal defect (P = .017), and weight of less than 2.5 kg (P = .0072) to be related to hospital death. On multivariate analysis, only weight of less than 2.5 kg and noncardiac abnormalities were found to be independent risk factors. Patients with either of these characteristics had a hospital survival of 52% (12/23), whereas those at standard risk had a survival of 86% (76/88). Although improvements in management might have lessened the effect of some of the traditionally reported risk factors related to variations in the cardiovascular anatomy, noncardiac abnormalities and low birth weight remain as a future challenge for the physician caring for the patient with single-ventricle physiology.

  3. Changes in field workability and drought risk from projected climate change drive spatially variable risks in Illinois cropping systems.

    Directory of Open Access Journals (Sweden)

    Bradley J Tomasek

    Full Text Available As weather patterns become more volatile and extreme, risks introduced by weather variability will become more critical to agricultural production. The availability of days suitable for field work is driven by soil temperature and moisture, both of which may be altered by climate change. We projected changes in Illinois season length, spring field workability, and summer drought risk under three different emissions scenarios (B1, A1B, and A2 down to the crop district scale. Across all scenarios, thermal time units increased in parallel with a longer frost-free season. An increase in late March and Early April field workability was consistent across scenarios, but a decline in overall April through May workable days was observed for many cases. In addition, summer drought metrics were projected to increase for most scenarios. These results highlight how the spatial and temporal variability in climate change may present unique challenges to mitigation and adaptation efforts.

  4. Projections of the current and future disease burden of hepatitis C virus infection in Malaysia.

    Science.gov (United States)

    McDonald, Scott A; Dahlui, Maznah; Mohamed, Rosmawati; Naning, Herlianna; Shabaruddin, Fatiha Hana; Kamarulzaman, Adeeba

    2015-01-01

    The prevalence of hepatitis C virus (HCV) infection in Malaysia has been estimated at 2.5% of the adult population. Our objective, satisfying one of the directives of the WHO Framework for Global Action on Viral Hepatitis, was to forecast the HCV disease burden in Malaysia using modelling methods. An age-structured multi-state Markov model was developed to simulate the natural history of HCV infection. We tested three historical incidence scenarios that would give rise to the estimated prevalence in 2009, and calculated the incidence of cirrhosis, end-stage liver disease, and death, and disability-adjusted life-years (DALYs) under each scenario, to the year 2039. In the baseline scenario, current antiviral treatment levels were extended from 2014 to the end of the simulation period. To estimate the disease burden averted under current sustained virological response rates and treatment levels, the baseline scenario was compared to a counterfactual scenario in which no past or future treatment is assumed. In the baseline scenario, the projected disease burden for the year 2039 is 94,900 DALYs/year (95% credible interval (CrI): 77,100 to 124,500), with 2,002 (95% CrI: 1340 to 3040) and 540 (95% CrI: 251 to 1,030) individuals predicted to develop decompensated cirrhosis and hepatocellular carcinoma, respectively, in that year. Although current treatment practice is estimated to avert a cumulative total of 2,200 deaths from DC or HCC, a cumulative total of 63,900 HCV-related deaths is projected by 2039. The HCV-related disease burden is already high and is forecast to rise steeply over the coming decades under current levels of antiviral treatment. Increased governmental resources to improve HCV screening and treatment rates and to reduce transmission are essential to address the high projected HCV disease burden in Malaysia.

  5. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Directory of Open Access Journals (Sweden)

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  6. Current Chemical Risk Management Activities

    Science.gov (United States)

    EPA's existing chemicals programs address pollution prevention, risk assessment, hazard and exposure assessment and/or characterization, and risk management for chemicals substances in commercial use.

  7. Evaluating the Impact of Risk on Contractor’s Tender Figure in Public Buildings Projects in Northern Nigeria

    Directory of Open Access Journals (Sweden)

    L. O. Oyewobi

    2012-01-01

    Full Text Available It has become almost impossible to have projects completed within the initial cost and time in Nigeria; this is as a result of many factors the construction industry is being plagued with ranging from estimating risk to time and cost overruns. The construction industry is widely associated with a high degree of risk and uncertainty due to the nature of its operating heterogeneous environment. The paper aimed at evaluating the impact of estimating risk on contractor’s tender sum with a view of ensuring efficient delivery of projects in the Northern part of Nigeria. A survey was conducted using questionnaire and a total of four headings of risk factors were identified. Research findings showed defects in design, inflation, contractor’s competence and political uncertainty as well as changes in government had greatest impact on contractor’s tender figure whereas likely trend in wages rates over the period, excessive approval procedure in administration government department, unavailability of sufficient amount of unskilled labor and technical manpower and resources of the company were the most significant factors to be considered by contractors when estimating the pricing risk. The paper recommends that construction professionals should identify and adequately quantify project estimating risk factors. Adding a risk premium to quotation and time estimation has to be supported by governmental owner organizations and other agencies in the local construction sector. Competent contractors should be allowed to tender so as to see the incidence of these estimating risks as an important aspect that requires attention while evaluating contractor’s tender sum.

  8. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  9. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    International Nuclear Information System (INIS)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun

    2014-01-01

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  10. Probabilistic risk analysis for the NASA space shuttle: a brief history and current work

    International Nuclear Information System (INIS)

    Pate-Cornell, Elisabeth; Dillon, Robin

    2001-01-01

    While NASA managers have always relied on risk analysis tools for the development and maintenance of space projects, quantitative and especially probabilistic techniques have been gaining acceptance in recent years. In some cases, the studies have been required, for example, to launch the Galileo spacecraft with plutonium fuel, but these successful applications have helped to demonstrate the benefits of these tools. This paper reviews the history of probabilistic risk analysis (PRA) by NASA for the space shuttle program and discusses the status of the on-going development of the Quantitative Risk Assessment System (QRAS) software that performs PRA. The goal is to have within NASA a tool that can be used when needed to update previous risk estimates and to assess the benefits of possible upgrades to the system

  11. Current issues in nuclear power projects decision making

    International Nuclear Information System (INIS)

    Yanev, Y.; Rogner, H.

    2011-01-01

    Concluding Comments: Firm government commitment and support - imminent; New financing approaches/models are emerging, repackaging existing methods and combination of project finance/co-operative mode; Global financial crisis will make financing for investors very challenging, especially for large scale infrastructure projects like NNP –financial regulators to impose tougher rules (Basel III, UK bank levy, US Financial Regulatory Bill, etc; Pure project finance is still challenging for nuclear projects - the availability of finance for new NPPs will depend on the initial government support. This presentation presents a “free market” view on investment in nuclear power projects; If the public sector (governments) wishes to invest in nuclear power as part of its socioeconomic development priorities, finance is not a real obstacle; It becomes an issue in the presence of other equally important development needs and private sector participation is sought

  12. 41 CFR 102-80.55 - Are Federal agencies responsible for managing the execution of risk reduction projects?

    Science.gov (United States)

    2010-07-01

    ... Management Risks and Risk Reduction Strategies § 102-80.55 Are Federal agencies responsible for managing the... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are Federal agencies responsible for managing the execution of risk reduction projects? 102-80.55 Section 102-80.55 Public...

  13. The importance of a project level risk management methodology for EU Structural and Investment Funds accession in Romania

    Directory of Open Access Journals (Sweden)

    Nicolae Ciprian

    2017-07-01

    Full Text Available Accessing EU funds is considered to be an important development chance for all type of beneficiaries in Romania: public bodies, nongovernmental organizations and firms. The grounds for this are the amount of funds available per beneficiary and the co financing rate (for example, the investment projects for firms amounted up to 5 million Euro of EU funding at a EU co financing rate up to 70%. As the Romanian responsible authorities strive to conduct a fast and smooth process, the reality shows the funds accession is rather unpredictable and costly, both in terms of time consumption and financial resources. Lots of causes contribute to this situation, amongst which the inefficient risk management conducted, both by the state authorities responsible with the EU funds management and by the beneficiaries of funds. The effects are visible: a poor absorption rate of the EU structural and cohesion funds (79,23% at the level of January 2017 for the 2007-2013 financial period. The authors' research follows the importance that risk management should have in the process of managing and accessing EU funds. The research methodology starts from the responses that 170 people involved in managing EU funded projects within 2007-2013 financial period gave to an online questionnaire carried on in 2016. The focus was to establish if and how risk management methodologies/procedures/guidelines were used within the implementation of projects and in what measure this kind of approach should be compulsory or optional for the financial period 2014-2020. The research methodology further implied the analysis of key issues for projects financing such as: feasibility and opportunity determination, budgeting, projects' evaluation, etc. The main finding of the research is that applicants and beneficiaries need to implement project level risk management methodologies. Based on this, the authors propose a guideline for drafting project level risk management methodologies, that

  14. PROJECT GOVERNANCE – PHASES AND LIFE CYCLE

    Directory of Open Access Journals (Sweden)

    Robbert Titus DEENEN

    2007-01-01

    Full Text Available When talking about projects, the barrier is clear: successful and failed. Some fail due to different reasons, but lack of good project and risk management played a large part. Others succeed largely because of the rigorous and disciplined application of good project practices. But both groups illustrate many points that underline and demonstrate important concepts applicable to current projects. Systematic application of good methods leads to successful outcomes in projects of all types. All projects are fundamentally dependent on people, and human beings are not very different today than we were hundreds, or even thousands, of years ago. This paper uncovers main elements in projects area such as the concepts and governance of projects, with an underline of the main characteristics and the projects phases and life cycle that erase the uncertainty that joins all the projects built at any time.

  15. Projection of human immunodeficiency virus among high-risk groups in Malaysia.

    Science.gov (United States)

    Mondal, Md Nazrul Islam; Shitan, Mahendran

    2013-01-01

    Human immunodeficiency virus (HIV)/acquired immunodeficiency syndrome (AIDS) presents a serious healthcare threat to young individuals in Malaysia and worldwide. This study aimed to identify trends in HIV-related risk behaviors among recognized high-risk groups and to estimate HIV transmission up to the year 2015. Data and necessary information were obtained from the Ministry of Health Malaysia, published reports from the World Health Organization and United Nations Program on HIV/AIDS, and other articles. The Estimation and Projection Package was used to estimate HIV transmission. The results of the present study revealed that within the high-risk groups, intravenous drug users (IDUs) had the highest prevalence rate of HIV transmission, followed by patients with sexually transmitted infections (STIs), female sex workers (SWs), and men who have sex with men (MSM). Within these at-risk populations, patients with STIs have the highest prevalence of HIV, followed by IDUs, MSM, and SWs. If the transmission rate continues to increase, the situation will worsen; therefore, there is an urgent need for a comprehensive prevention program to control HIV transmission in Malaysia.

  16. Current drinking and health-risk behaviors among male high school students in central Thailand

    Directory of Open Access Journals (Sweden)

    Pichainarong Natchaporn

    2011-04-01

    Full Text Available Abstract Background Alcohol drinking is frequently related to behavioral problems, which lead to a number of negative consequences. This study was to evaluate the characteristics of male high school students who drink, the drinking patterns among them, and the associations between current drinking and other health risk behaviors which focused on personal safety, violence-related behaviors, suicide and sexual behaviors. Method A cross-sectional study was conducted to explore current alcohol drinking and health-risk behaviors among male high school students in central Thailand. Five thousand one hundred and eighty four male students were classified into 2 groups according to drinking in the previous 30 days (yes = 631, no = 4,553. Data were collected by self-administered, anonymous questionnaire which consisted of 3 parts: socio-demographic factors, health-risk behaviors and alcohol drinking behavior during the past year from December 2007 to February 2008. Results The results showed that the percent of current drinking was 12.17. Most of them were 15-17 years (50.21%. Socio-demographic factors such as age, educational level, residence, cohabitants, grade point average (GPA, having a part time job and having family members with alcohol/drug problems were significantly associated with alcohol drinking (p Conclusions An increased risk of health-risk behaviors, including driving vehicles after drinking, violence-related behaviors, sad feelings and attempted suicide, and sexual behaviors was higher among drinking students that led to significant health problems. Effective intervention strategies (such as a campaign mentioning the adverse health effects and social consequences to the risk groups, and encouraging parental and community efforts to prevent drinking among adolescents should be implemented to prevent underage drinking and adverse consequences.

  17. Assessing Risk in Costing High-energy Accelerators: from Existing Projects to the Future Linear Collider

    CERN Document Server

    Lebrun, Philippe

    2010-01-01

    High-energy accelerators are large projects funded by public money, developed over the years and constructed via major industrial contracts both in advanced technology and in more conventional domains such as civil engineering and infrastructure, for which they often constitute one-of markets. Assessing their cost, as well as the risk and uncertainty associated with this assessment is therefore an essential part of project preparation and a justified requirement by the funding agencies. Stemming from the experience with large circular colliders at CERN, LEP and LHC, as well as with the Main Injector, the Tevatron Collider Experiments and Accelerator Upgrades, and the NOvA Experiment at Fermilab, we discuss sources of cost variance and derive cost risk assessment methods applicable to the future linear collider, through its two technical approaches for ILC and CLIC. We also address disparities in cost risk assessment imposed by regional differences in regulations, procedures and practices.

  18. Ecological effects and potential risks of the water diversion project in the Heihe River Basin.

    Science.gov (United States)

    Zhang, Mengmeng; Wang, Shuai; Fu, Bojie; Gao, Guangyao; Shen, Qin

    2018-04-01

    To curb the severe ecological deterioration in the lower Heihe River Basin (HRB) in northwest China, a water diversion project was initiated in 2000. A comprehensive analysis of the ecological effects and potential risks associated with the project is needed. We assessed the hydrological and ecological achievements, and also analyzed the potential problems after the project was completed. We found that since the project began the hydrological regime has changed, with more than 57.82% of the upstream water being discharged to the lower reaches on average. As a result, the groundwater level in the lower reaches has risen; the terminal lake has gradually expanded to a maximum area in excess of 50km 2 since 2010, and there has been a significant recovery of vegetation in the riparian zone and the Ejin core oases, which represents the initial rehabilitation of the degraded downstream environment. Additionally, the economy of Ejin has developed spectacularly, with an annual growth rate of 28.06%. However, in the middle reaches, the average groundwater level has continuously declined by a total of 5.8m and significant degradation of the vegetation has occurred along the river course. The discrepancy in the water allocation between the middle and lower reaches has intensified. This highlights the inability of the current water diversion scheme to realize further ecological restoration and achieve sustainable development throughout the whole basin. In future water management programs, we recommend that water allocation is coordinated by considering the basin as an integrated entity and to scientifically determine the size of the midstream farmland and downstream oasis; restrict non-ecological water use in the lower reaches, and jointly dispatch the surface water and groundwater. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. Goals and activities of the JICA technical cooperation project on reduction of seismic risk in Romania

    International Nuclear Information System (INIS)

    Vacareanu, R.; Kato, H.

    2007-01-01

    Japan International Cooperation Agency (JICA) Technical Cooperation Project on Reduction of Seismic Risk for Buildings and Structures started in Romania on October 1, 2002. The aim of the Project is to strengthen the capacity of earthquake disaster related activities in Romania. The Project approval is the result of four years of intensive efforts made by professionals from Technical University of Civil Engineering Bucharest (UTCB), Ministry of Transport, Constructions and Tourism (MTCT), Romania, National Building Research Institute (INCERC) Bucharest, JICA, Building Research Institute (BRI), Tsukuba, and National Institute for Land, Infrastructure and Management (NILIM), Tsukuba, Japan. The duration of the Project is five years. The implementing agency is the National Center for Seismic Risk Reduction (NCSRR) as a public institution of national interest under MTCT. The activities are carried out by NCSRR in partnership with UTCB and INCERC. During the Project period, 29 young Romanian engineers were trained in Japan, 7 Japanese experts and 37 Japanese experts worked for long-term and short-term, respectively in Romania. Equipment for seismic instrumentation, dynamic characterization of soil and structural testing rising up approximately to 260 million yens (i.e. 2.17 million USD) were donated by JICA to Romania, through NCSRR. The total cost of the Project is roughly 7 million USD. The paper describes the main activities and results of the Project until the JICA Final Evaluation Mission (March 2007). (authors)

  20. Qualification program of the ASTRID SFR project: definition, methodology and associated risk evaluation and management - 15093

    International Nuclear Information System (INIS)

    Rodriguez, G.; Dirat, J.F.; Traina, A.; Christofari, M.

    2015-01-01

    The Preconceptual Design phase of the ASTRID French Sodium Fast Reactor project had the objective to integrate innovative options to meet the requirements of the 4. generation reactors and to comply with the related specifications. It was followed by the conceptual phase studies (AVP2 phase 2013-2015) where some technical options are left opened with an advanced option and a backup alternative. In the same time of the AVP2 phase studies, the qualification program related to ASTRID project was initiated. It consists in collecting the exhaustive list of research/development (R/D) needs and technological demonstration tests to be fulfilled on representative mockup prior to component implementation in the prototype. The ASTRID Qualification Program (AQP) objectives are to collect needs expressed by all engineering companies involved in ASTRID, and then to organize the answer to this expression of needs. This significant work of needs compilation has been divided in several tasks, according to the ASTRID project decomposition in the Product Breakdown Structure (PBS). Compilation of needs was jointly performed by engineering company, R/D responsible and coordinated by the ASTRID Qualification project responsible. It was associated with an evaluation of the maturity level of the technical options thanks to a Technological Readiness Level grid (TRL ranking table), an identification of major risks, and an evaluation of the R/D potentiality and associated facility platform. The methodology applied for the ASTRID Qualification Program (AQP) is presented. It is explained what methodology was used associated to the TRL process, and how is managed the associated risk analysis evaluation: evaluation of major risks, definition of a risk portfolio and a corresponding Action Plan for risk reduction (synthesized under the REM acronym: Risk Evaluation and Management). This methodology is a mean used to facilitate ASTRID risk-informed decision making, technology qualification and

  1. The price of policy risk — Empirical insights from choice experiments with European photovoltaic project developers

    International Nuclear Information System (INIS)

    Lüthi, Sonja; Wüstenhagen, Rolf

    2012-01-01

    Managing the transition to a renewable energy future is an important policy priority in many countries. Solar photovoltaic (PV) technology is expected to make an essential contribution, but due to relatively high cost, its growth to date has been largely driven by public policy, notably feed-in tariffs. Feed-in tariffs have been implemented in various countries, but with widely differing outcomes in terms of installed PV capacity. Previous research indicates that the level of policy risk may be an important driver for differences in renewable energy policy effectiveness. This paper suggests that project developers who make a decision between PV investment opportunities in different countries carefully weigh feed-in tariff-induced returns against a set of policy risks, and choose the country with the most favorable risk-return profile. This model is empirically tested by a stated preference survey among European PV project developers, consisting of 1575 choice decisions by 63 investors. The findings demonstrate that risk matters in PV policy design, and that a “price tag” can be attached to specific policy risks, such as the duration of administrative processes or uncertainty induced by an approaching capacity cap. Governments can build on these empirical results to design policies that will be effective in attracting private PV investment, while at the same time maintaining efficiency by providing an adequate compensation for policy risk. - Highlights: ► This study is based on 1575 choice and rating decisions made by 63 European PV project developers. ► This study confirms importance of “non-economic” barriers to deployment of renewable energy. ► This study measures “price of policy risk”, i.e. investors' willingness-to-accept certain policy risks.

  2. Pharmaceutical company perspectives on current safety risk communications in Japan.

    Science.gov (United States)

    Urushihara, Hisashi; Kobashi, Gen; Masuda, Hideaki; Taneichi, Setsuko; Yamamoto, Michiko; Nakayama, Takeo; Kawakami, Koji; Matsuda, Tsutomu; Ohta, Kaori; Sugimori, Hiroki

    2014-01-01

    In 1987, a group infection of hepatitis in patients receiving a contaminated fibrinogen product was first reported to the Japanese regulatory agency. Eventually, this serious drug incident involved more than 10,000 cases of infection. In response, the Government of Japan established a responding inspection committee in 2008 to make recommendations for the restructuring of drug regulatory administration. The final report was issued in 2010. One agenda item of this restructuring was the improvement of drug-related safety risk communications. Our research group on drug safety risk communications, which is funded by the Government of Japan, surveyed pharmaceutical companies regarding their perspective on current risk communications. The survey was conducted using an anonymous questionnaire developed for this study which included the three operational domains of targets, contents, and measures of drug risk communication. Fifty-two of the 74 member companies of the Post-marketing Surveillance Subcommittee of the Japan Pharmaceutical Manufacturer's Association participated, and this response rate of more than 70% was considered sufficient to ensure the external validity of the survey results. Results showed that the most highly prioritized aspect of risk messaging was the strength of evidence, and that outcome evaluation of risk communication gained recognition. Further, while physicians and pharmacists were the most prioritized communication targets, pharmacovigilance departments devoted the most resources to regulators, at more than 30%. The Internet was recognized as a useful public source of risk information, whereas Drug Guides for Patients delivered on the web were considered under-recognized. Further discussion of these results with the aim of enhancing the restructuring of the Japanese drug regulatory administration system are warranted.

  3. Current Efforts in European Projects to Facilitate the Sharing of Scientific Observation Data

    Science.gov (United States)

    Bredel, Henning; Rieke, Matthes; Maso, Joan; Jirka, Simon; Stasch, Christoph

    2017-04-01

    This presentation is intended to provide an overview of currently ongoing efforts in European projects to facilitate and promote the interoperable sharing of scientific observation data. This will be illustrated through two examples: a prototypical portal developed in the ConnectinGEO project for matching available (in-situ) data sources to the needs of users and a joint activity of several research projects to harmonise the usage of the OGC Sensor Web Enablement standards for providing access to marine observation data. ENEON is an activity initiated by the European ConnectinGEO project to coordinate in-situ Earth observation networks with the aim to harmonise the access to observations, improve discoverability, and identify/close gaps in European earth observation data resources. In this context, ENEON commons has been developed as a supporting Web portal for facilitating discovery, access, re-use and creation of knowledge about observations, networks, and related activities (e.g. projects). The portal is based on developments resulting from the European WaterInnEU project and has been extended to cover the requirements for handling knowledge about in-situ earth observation networks. A first prototype of the portal was completed in January 2017 which offers functionality for interactive discussion, information exchange and querying information about data delivered by different observation networks. Within this presentation, we will introduce the presented prototype and initiate a discussion about potential future work directions. The second example concerns the harmonisation of data exchange in the marine domain. There are many organisation who operate ocean observatories or data archives. In recent years, the application of the OGC Sensor Web Enablement (SWE) technology has become more and more popular to increase the interoperability between marine observation networks. However, as the SWE standards were intentionally designed in a domain independent manner

  4. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume I. Introduction to the SPAHR demographic model for health risk

    Energy Technology Data Exchange (ETDEWEB)

    Collins, J.J.; Lundy, R.T.; Grahn, D.; Ginevan, M.E.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. The first volume presents the theory behind the SPAHR health risk projection model and several applications of the model to actual pollution episodes. The elements required for an effective health risk projection model are specified, and the models that have been used to date in health risk projections are outlined. These are compared with the demographic model, whose formulation is described in detail. Examples of the application of air pollution and radiation dose-response functions are included in order to demonstrate the estimation of future mortality and morbidity levels and the range of variation in excess deaths that occurs when populations structure is changed.

  5. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume I. Introduction to the SPAHR demographic model for health risk

    International Nuclear Information System (INIS)

    Collins, J.J.; Lundy, R.T.; Grahn, D.; Ginevan, M.E.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projections. The model extends several health risk projection models by making realistic assumptions about the population at risk, and thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. The first volume presents the theory behind the SPAHR health risk projection model and several applications of the model to actual pollution episodes. The elements required for an effective health risk projection model are specified, and the models that have been used to date in health risk projections are outlined. These are compared with the demographic model, whose formulation is described in detail. Examples of the application of air pollution and radiation dose-response functions are included in order to demonstrate the estimation of future mortality and morbidity levels and the range of variation in excess deaths that occurs when populations structure is changed

  6. On-going activities of the EC project ''Benipa'' current status, key issues and achievements

    International Nuclear Information System (INIS)

    Alonso, J.

    2003-01-01

    BENIPA (Bentonite Barriers in Integrated Performance Assessment) is a research project, within the Fifth Framework Programme of the European Union, which was started on September 2000 and is has a duration of 36 months. The overall objective of BENIPA is to assess the state of the art in the treatment of bentonite barriers in Integrated Performance Assessment, evaluating the capacity and consistency of methods and data available to convincingly justify the capacity of bentonite to perform their assigned safety functions. During the first part of the project different bentonite barrier concepts have been reviewed and four reference cases have been defined for the modelling work in the project. FEP's Databases have been created and the scientific and technical bases for the analysis of bentonite barriers have been reviewed. In the second part of the project. as a step previous to modelling, an analysis of models for the mechanical, hydrological, thermal and chemical conditions is carried out, along with a review of the needs in input data. In BENIPA, calculations at process and integrated level are currently being performed among different codes to check consistency and sufficiency or complementarity for fulfilling the needs of performance assessment. However, since it is too early to present some of the results or even the individual contributions of the partners, the modelling and calculations being currently carried out by ENRESA will be advanced, just as a representative example of the work going on. This paper summarises the work already done in BENIPA and provides with illustrations of the modelling work consisting of the approach followed by ENRESA in applying three codes: CODE-BRIGHT, CORE 2D and GOLDSIM. The processes considered, simplifications adopted, limitations imposed and preliminary findings of the work are mentioned along. (author)

  7. The risk philosophy of radiation protection

    International Nuclear Information System (INIS)

    Lindell, B.

    1996-01-01

    The processes of risk assessment and risk evaluation are described. The assumptions behind current radiation risk assessments, which are focused on the probability of attributable death from radiation-induced cancer, are reviewed. These assessments involve projection models to take account of future cancer death in irradiated populations, the transfer of risk estimates between populations and the assumptions necessary to derive risk assessments for low radiation doses from actual observations at high doses. The paper ends with a presentation of the basic radiation protection recommendations of the International Commission on Radiological Protection (ICRP) in the context of a risk philosophy. (author)

  8. Current products and future plan of regulatory technology R and D for risk-informed regulation and applications

    International Nuclear Information System (INIS)

    Song, K. Y.; Lee, C. J.; Kim, W. S.; Jeong, D. W.; Kim, H. J.

    2002-01-01

    The first phase of a R and D project for risk-informed regulation (RIR) and applications (RIA) has been finished. Various results which would be useful for preparing domestic RIR system were accomplished, in areas of safety goals and general principles of RIR, which provide fundamental bases for establishment of RIR system as well as regulatory review guides, which ensure the quality for PSA. RIA guidelines for ISI, IST, MOV, Tech.-Sepc. also have been developed, implementing some pilot plant applications. As essential documents for actual RIR inspection, risk-informed inspection guides and implementation guide for maintenance effectiveness were prepared. In the second phase of R and D, two projects on RIR area will be performed. One is to study on institutionalization of RIR and performance-based regulation, another is to develop a PSA model for regulatory audit as well as regulatory technology for risk monitoring

  9. Achieving Conservation and Equity amidst Extreme Poverty and Climate Risk: The Makira REDD+ Project in Madagascar

    Directory of Open Access Journals (Sweden)

    Laura Brimont

    2015-03-01

    Full Text Available Achieving forest conservation together with poverty alleviation and equity is an unending challenge in the tropics. The Makira REDD+ pilot project located in northeastern Madagascar is a well-suited case to explore this challenge in conditions of extreme poverty and climatic vulnerability. We assessed the potential effect of project siting on the livelihoods of the local population and which households would be the most strongly impacted by conservation measures. Farmers living in hilly areas must resort to slash-and-burn agriculture (tavy since a combination of topographic and climatic constraints, such as cyclones, makes permanent rice cultivation very difficult. These are the people who suffer most from conservation-related restriction measures. For practical reasons the project, unfortunately, did not target these farmers. The main focus was on communities with a lower cyclonic risk that are able to practice permanent rice agriculture in the lowlands. To reduce deforestation without violating the principles of equity, REDD+ projects in Madagascar need to better target populations facing high climatic risks and invest in efforts to improve the farmers’ agricultural systems.

  10. Risk management

    OpenAIRE

    Mcmanus, John

    2009-01-01

    Few projects are completed on time, on budget, and to their original requirement or specifications. Focusing on what project managers need to know about risk in the pursuit of delivering projects, Risk Management covers key components of the risk management process and the software development process, as well as best practices for risk identification, risk planning, and risk analysis. The book examines risk planning, risk analysis responses to risk, the tracking and modelling of risks, intel...

  11. Assessment of the Appalachian Basin Geothermal Field: Combining Risk Factors to Inform Development of Low Temperature Projects

    Science.gov (United States)

    Smith, J. D.; Whealton, C.; Camp, E. R.; Horowitz, F.; Frone, Z. S.; Jordan, T. E.; Stedinger, J. R.

    2015-12-01

    Exploration methods for deep geothermal energy projects must primarily consider whether or not a location has favorable thermal resources. Even where the thermal field is favorable, other factors may impede project development and success. A combined analysis of these factors and their uncertainty is a strategy for moving geothermal energy proposals forward from the exploration phase at the scale of a basin to the scale of a project, and further to design of geothermal systems. For a Department of Energy Geothermal Play Fairway Analysis we assessed quality metrics, which we call risk factors, in the Appalachian Basin of New York, Pennsylvania, and West Virginia. These included 1) thermal field variability, 2) productivity of natural reservoirs from which to extract heat, 3) potential for induced seismicity, and 4) presence of thermal utilization centers. The thermal field was determined using a 1D heat flow model for 13,400 bottomhole temperatures (BHT) from oil and gas wells. Steps included the development of i) a set of corrections to BHT data and ii) depth models of conductivity stratigraphy at each borehole based on generalized stratigraphy that was verified for a select set of wells. Wells are control points in a spatial statistical analysis that resulted in maps of the predicted mean thermal field properties and of the standard error of the predicted mean. Seismic risk was analyzed by comparing earthquakes and stress orientations in the basin to gravity and magnetic potential field edges at depth. Major edges in the potential fields served as interpolation boundaries for the thermal maps (Figure 1). Natural reservoirs were identified from published studies, and productivity was determined based on the expected permeability and dimensions of each reservoir. Visualizing the natural reservoirs and population centers on a map of the thermal field communicates options for viable pilot sites and project designs (Figure 1). Furthermore, combining the four risk

  12. Management of construction cost contingency covering upside and downside risks

    Directory of Open Access Journals (Sweden)

    Ibrahim Adel Eldosouky

    2014-12-01

    Full Text Available Many contractors are of the opinion that adding contingency funds to the tender price of a project may lead to loss of the tender. This research is a trial to put an end to this incorrect opinion. A more mature attitude to risk would recognize that contingency exists to be spent in order to avoid or minimize threats and to exploit or maximize opportunities. This research proposes an approach for determination and monitoring of Cost Contingency Reserve (CCR for a project. Control of CCR is interfaced with Earned Value Management. Application to a real project is carried out. Post-mitigation simulations show that value of CCR is 2.88% of project cost but there is a potential saving due to opportunities. The project is monitored after eight months from its assumed start date with one assumed emergent risk. The final results are as follows: CCR is enough to cover project current and residual threats and the contractor has a considerable amount of money that will be transferred to his margin at project closure assuming the project will not be exposed to additional emergent risks. A contractor can balance project upside risks and its downsides to increase his chance to win tender of the project.

  13. 78 FR 11611 - Current Good Manufacturing Practice and Hazard Analysis and Risk-Based Preventive Controls for...

    Science.gov (United States)

    2013-02-19

    ... related to the proposed rule on ``Current Good Manufacturing Practice and Hazard Analysis and Risk-Based... . All comments should be identified with the title ``Current Good Manufacturing Practice and Hazard... rulemaking to modernize the regulation for ``Current Good Manufacturing Practice In Manufacturing, Packing...

  14. The relevance of the early history of probability theory to current risk assessment practices in mental health care.

    Science.gov (United States)

    Large, Matthew

    2013-12-01

    Probability theory is at the base of modern concepts of risk assessment in mental health. The aim of the current paper is to review the key developments in the early history of probability theory in order to enrich our understanding of current risk assessment practices.

  15. Current issues regarding radiation risk education in Medical Universities of Japan

    International Nuclear Information System (INIS)

    Tsuzuki, Teruhisa; Hosoi, Yoshio; Matsuda, Naoki; Kanda, Reiko; Hosoya, Noriko; Miyagawa, Kiyoshi; Awai, Kazuo; Kondo, Takashi

    2017-01-01

    The main purpose of radiation research is to understand the biological effects of radiation exposure to humans, the molecular mechanisms of biological response m organisms, and its sale application for medical and industrial use. In order to know the current state or education on fundamentals of radiology including radiation biology, a nation-wide questionnaire survey had been performed at medical schools and different co-medical courses in Japanese universities, during the period of 2004 and 2005. The survey results showed: (1) Difference in teaching hours for education on radiation between medical schools with and without department or division of radiation biology or radiation-related field. (2) Teaching hours for education on radiation in nursing course were very limited among the co-medical courses. Although, some improvement have been found about the state of education on radiation risk at medical schools, after the disaster of nuclear accident at Fukushima No.1 Nuclear Power Plant of TEPCO in March 2011. However, still much more effort t is needed to improve basic education on radiation. Science Council of Japan issued the recommendation on September 4, 2014 'Making radiation health risk education compulsory in medical education'. The working group for this purpose was set up under the Council of Head of National Medical Schools of Japan, on January 28, 2015. Here, we describe the details and current issues regarding radiation risk education in medical schools of Japan, as well as the efforts required for its betterment. (author)

  16. Projecting Sexual and Injecting HIV Risks into Future Outcomes with Agent-Based Modeling

    Science.gov (United States)

    Bobashev, Georgiy V.; Morris, Robert J.; Zule, William A.

    Longitudinal studies of health outcomes for HIV could be very costly cumbersome and not representative of the risk population. Conversely, cross-sectional approaches could be representative but rely on the retrospective information to estimate prevalence and incidence. We present an Agent-based Modeling (ABM) approach where we use behavioral data from a cross-sectional representative study and project the behavior into the future so that the risks of acquiring HIV could be studied in a dynamical/temporal sense. We show how the blend of behavior and contact network factors (sexual, injecting) play the role in the risk of future HIV acquisition and time till obtaining HIV. We show which subjects are the most likely persons to get HIV in the next year, and whom they are likely to infect. We examine how different behaviors are related to the increase or decrease of HIV risks and how to estimate the quantifiable risk measures such as survival HIV free.

  17. Current status of JMTR refurbishment project

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Niimi, Motoji; Hori, Naohiko; Takahashi, Kunihiro; Kanno, Masaru; Nakagawa, Tetsuya; Nagao, Yoshiharu; Ishihara, Masahiro; Kawamura, Hiroshi

    2010-02-01

    The JMTR is a light water moderated and cooled, beryllium reflected tank- type reactor using LUE silicide plate-type fuels. Its thermal power is 50 MW, maximum thermal and fast neutron flux is 4x10 18 m -2 s -1 . First criticality was achieved in March 1968, and its operation was stopped from August, 2006 for the refurbishment. The refurbishment is scheduled from the beginning of FY2007 to the end of FY2010. The renewed and upgraded JMTR will be re-started from FY2011. An investigation on aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, etc., and for tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out at the beginning of FY2007. As a result, some components were decided to replace from viewpoints of future maintenance and improvement of reliability, and some components or structures were decided to repair. A visual inspection of inner side of the pressure vessel was carried out using an underwater camera in FY2008, and no serious damage was observed. Up to now, refurbishment works are in progress according to the planned schedule. In FY2009, motors of primary cooling pumps, secondary cooling pumps, motors of drain pumps, pump in the primary water transfer line to the water purification system, beryllium reflector frame, low-voltage motor control centers are to be replaced. A nuclear instrumentation system, process control system, safety protection system and so on are to be replaced in FY2010. In this paper, current status of JMTR refurbishment project is presented. (author)

  18. 78 FR 48636 - Current Good Manufacturing Practice and Hazard Analysis and Risk-Based Preventive Controls for...

    Science.gov (United States)

    2013-08-09

    ... collection related to the proposed rule, ``Current Good Manufacturing Practice and Hazard Analysis and Risk... period. These two proposals are related to the proposed rule ``Current Good Manufacturing Practice and... final extension of the comment period for the ``Current Good Manufacturing Practice and Hazard Analysis...

  19. The VeTOOLS Project: an example of how to strengthen collaboration between scientists and Civil Protections in disaster risk reduction

    Science.gov (United States)

    Marti, Joan; Bartolini, Stefania; Becerril, Laura

    2016-04-01

    VeTOOLS is a project funded by the European Commission's Humanitarian Aid and Civil Protection department (ECHO), and aims at creating an integrated software platform specially designed to assess and manage volcanic risk. The project facilitates interaction and cooperation between scientists and Civil Protection Agencies in order to share, unify, and exchange procedures, methodologies and technologies to effectively reduce the impacts of volcanic disasters. The project aims at 1) improving and developing volcanic risk assessment and management capacities in active volcanic regions; 2) developing universal methodologies, scenario definitions, response strategies and alert protocols to cope with the full range of volcanic threats; 4) improving quantitative methods and tools for vulnerability and risk assessment; and 5) defining thresholds and protocols for civil protection. With these objectives, the VeTOOLS project points to two of the Sendai Framework resolutions for implementing it: i) Provide guidance on methodologies and standards for risk assessments, disaster risk modelling and the use of data; ii) Promote and support the availability and application of science and technology to decision-making, and offers a good example on how a close collaboration between science and civil protection is an effective way to contribute to DRR. European Commission ECHO Grant SI2.695524

  20. DOE`s approach to groundwater compliance on the UMTRA project

    Energy Technology Data Exchange (ETDEWEB)

    Metzler, D. [Dept. of Energy, Washington, DC (United States); Gibb, J.P. [Geraghty and Miller, Inc. (United States); Glover, W.A. [Roy F. Weston, Inc. (United States)

    1993-03-01

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists, a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.

  1. The Impact of Tax Shocks and Oil Price Volatility on Risk - A Study of North Sea Oilfield Projects

    OpenAIRE

    Kretzschmar, Gavin Lee; Moles, Peter

    2006-01-01

    We examine the impact of market volatility and increased fiscal take on risk in strategic natural resource projects. An increase in 2006 UK oilfield taxation is used as a natural experiment for assessing the impact of a fiscal increase on oilfield projects comprising 73% of UK reserves. Stochastic cash flow at risk models combine market volatility and tax-take at the oilfield level to extend earlier North Sea studies. We demonstrate that a 10% Secondary tax increase in a composite UKCS fiscal...

  2. The 12-lead electrocardiogram and risk of sudden death: current utility and future prospects.

    Science.gov (United States)

    Narayanan, Kumar; Chugh, Sumeet S

    2015-10-01

    More than 100 years after it was first invented, the 12-lead electrocardiogram (ECG) continues to occupy an important place in the diagnostic armamentarium of the practicing clinician. With the recognition of relatively rare but important clinical entities such as Wolff-Parkinson-White and the long QT syndrome, this clinical tool was firmly established as a test for assessing risk of sudden cardiac death (SCD). However, over the past two decades the role of the ECG in risk prediction for common forms of SCD, for example in patients with coronary artery disease, has been the focus of considerable investigation. Especially in light of the limitations of current risk stratification approaches, there is a renewed focus on this broadly available and relatively inexpensive test. Various abnormalities of depolarization and repolarization on the ECG have been linked to SCD risk; however, more focused work is needed before they can be deployed in the clinical arena. The present review summarizes the current knowledge on various ECG risk markers for prediction of SCD and discusses some future directions in this field. Published on behalf of the European Society of Cardiology. All rights reserved. © The Author 2015. For permissions please email: journals.permissions@oup.com.

  3. Reduction of radiation risks in patients undergoing some X-ray examinations by using optimal projections: A Monte Carlo program-based mathematical calculation

    Directory of Open Access Journals (Sweden)

    A Chaparian

    2014-01-01

    Full Text Available The objectives of this paper were calculation and comparison of the effective doses, the risks of exposure-induced cancer, and dose reduction in the gonads for male and female patients in different projections of some X-ray examinations. Radiographies of lumbar spine [in the eight projections of anteroposterior (AP, posteroanterior (PA, right lateral (RLAT, left lateral (LLAT, right anterior-posterior oblique (RAO, left anterior-posterior oblique (LAO, right posterior-anterior oblique (RPO, and left posterior-anterior oblique (LPO], abdomen (in the two projections of AP and PA, and pelvis (in the two projections of AP and PA were investigated. A solid-state dosimeter was used for the measuring of the entrance skin exposure. A Monte Carlo program was used for calculation of effective doses, the risks of radiation-induced cancer, and doses to the gonads related to the different projections. Results of this study showed that PA projection of abdomen, lumbar spine, and pelvis radiographies caused 50%-57% lower effective doses than AP projection and 50%-60% reduction in radiation risks. Also use of LAO projection of lumbar spine X-ray examination caused 53% lower effective dose than RPO projection and 56% and 63% reduction in radiation risk for male and female, respectively, and RAO projection caused 28% lower effective dose than LPO projection and 52% and 39% reduction in radiation risk for males and females, respectively. About dose reduction in the gonads, using of the PA position rather than AP in the radiographies of the abdomen, lumbar spine, and pelvis can result in reduction of the ovaries doses in women, 38%, 31%, and 25%, respectively and reduction of the testicles doses in males, 76%, 86%, and 94%, respectively. Also for oblique projections of lumbar spine X-ray examination, with employment of LAO rather than RPO and also RAO rather than LPO, demonstrated 22% and 13% reductions to the ovaries doses and 66% and 54% reductions in the

  4. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  5. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  6. EMERGInG RISKS In SMART PROCESS InDUSTRY CRAnES SURVEY: SAF€RA RESEARCH PROJECT SPRInCE

    Directory of Open Access Journals (Sweden)

    Vesna Spasojević Brkić

    2015-11-01

    Full Text Available Current accident theories show that the solution to avoid human error cannot be based on focusing only on the correction of operators’ behavior, but needs certain innovation that will help to keep an error away. Since, as evidenced by several incident surveys, cranes are the most dangerous equipment in industrial and construction sites and human error is the most frequent cause of accidents, in this frame the crane navigation system is an important and challenging component, with a great potential for safety improvement. However, as the emerging and rapid development of new technologies aims improving the working conditions and environment through solutions regarding existing well-known problems in occupational safety, their implementation also could lead to emerging hazards and risks that must be taken into account and managed. Based on these facts, SPRINCE (Smart PRocess INdustry CranEs project aims implementing a real-time object detection solution, which deals with cranes’ tracking systems and incorporates visual feedback, developing and implementing an innovative tool for evaluation of organizational and human (operator-specific factors. These factors will be included in the risk indicators of the implemented real-time object detection solution using case studies approach.

  7. Soft drink consumption and gestational diabetes risk in the SUN project.

    Science.gov (United States)

    Donazar-Ezcurra, Mikel; Lopez-Del Burgo, Cristina; Martinez-Gonzalez, Miguel A; Basterra-Gortari, Francisco J; de Irala, Jokin; Bes-Rastrollo, Maira

    2018-04-01

    Gestational diabetes mellitus (GDM) prevalence is increasing worldwide. To the best of our knowledge the specific evaluation of soft drink consumption as a risk factor for developing GDM has only been conducted in the Nurses' Health Study II. To investigate the incidence of GDM according to soft drink consumption in the SUN project. The "Seguimiento Universidad de Navarra" (SUN) project is a prospective and dynamic cohort which included data of 3396 women who notified at least one pregnancy between December 1999 and March 2012. A validated 136-item semi-quantitative food frequency questionnaire was used to assess soft drink consumption. Four categories of sugar-sweetened soft drink (SSSD) and diet soft drink (DSD) consumption (servings) were established: rarely or never (3/month and ≤1/week) and high (≥2/week). Potential confounders were adjusted through non-conditional logistic regression models. During the follow-up, we identified 172 incident cases of GDM. After adjusting for age, baseline body mass index, family history of diabetes, smoking, total energy intake, physical activity, parity, fast-food consumption, adherence to Mediterranean dietary pattern, alcohol intake, multiple pregnancy, cardiovascular disease/hypertension at baseline, fiber intake, following special diet and snacking, SSSD consumption was significantly associated with an increased risk of incident GDM, with multivariable adjusted odds ratios (OR) of 2.03 (95% confidence interval [CI]: 1.25-3.31) and 1.67 (95% CI: 1.01-2.77) for the highest and intermediate categories, respectively, versus the lowest category (p for linear trend: 0.006). Conversely, DSD consumption was not associated with GDM incidence (adjusted OR: 0.82; 95% CI: 0.52-1.31) for the highest versus the lowest category (p for linear trend: 0.258). Additional sensitivity analyses did not change the results. Higher consumption of SSSDs before pregnancy was an independent risk factor for GDM, however, no association was

  8. A current perspective on the risk significance of steam explosions

    International Nuclear Information System (INIS)

    Snyder, A.W.

    1982-01-01

    The view currently held in the Sandia National Laboratory is that, in the case of a meltdown in the reactor core, the probability of a steam explosion is greater than was estimated in WASH-1400, but that the extent and effect of an explosion will be very much smaller than assumed in WASH-1400. This results in a far smaller total risk with regard to containment. In WASH-1400, a nominal conditional probability of 1% was assumed for a containment rupture in a PWR-type reactor, should a large part of the reactor fuel be subject to meltdown during the course of the accident. The German risk analysis study 'Deutsche Risikostudie Kernkraftwerke' dated 1979 considers an explosion of a size sufficient to represent a threat to containment to be considerably more improbable than was assumed in WASH-1400. (orig./DG) [de

  9. Clinical Risk Assessment in the Antiphospholipid Syndrome: Current Landscape and Emerging Biomarkers.

    Science.gov (United States)

    Chaturvedi, Shruti; McCrae, Keith R

    2017-07-01

    Laboratory criteria for the classification of antiphospholipid syndrome include the detection of a lupus anticoagulant and/or anticardiolipin and anti-β2-glycoprotein I antibodies. However, the majority of patients who test positive in these assays do not have thrombosis. Current risk-stratification tools are largely limited to the antiphospholipid antibody profile and traditional thrombotic risk factors. Novel biomarkers that correlate with disease activity and potentially provide insight into future clinical events include domain 1 specific anti-β 2 GPI antibodies, antibodies to other phospholipids or phospholipid/protein antigens (such as anti-PS/PT), and functional/biological assays such as thrombin generation, complement activation, levels of circulating microparticles, and annexin A5 resistance. Clinical risk scores may also have value in predicting clinical events. Biomarkers that predict thrombosis risk in patients with antiphospholipid antibodies have been long sought, and several biomarkers have been proposed. Ultimately, integration of biomarkers with established assays and clinical characteristics may offer the best chance of identifying patients at highest risk of APS-related complications.

  10. 76 FR 31329 - EPA Radiogenic Cancer Risk Models and Projections for the U.S. Population (Blue Book)

    Science.gov (United States)

    2011-05-31

    ... Models and Projections for the U.S. Population (Blue Book) AGENCY: Environmental Protection Agency (EPA...-11-001, April 2011), also known as the Blue Book, which provides radiation risk assessment methodology. EPA will use the scientific information on radiation risks provided in the Blue Book, together...

  11. PROJECT APPROACH TO ENERGY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Інга Борисівна СЕМКО

    2016-02-01

    Full Text Available Project management is widely used around the world as a tool to improve business performance. Correct implementation of the program of implementation of energy efficiency is accompanied by the adoption of an appropriate legislative framework, support programs, the approval of market-based instruments. Currently, it is paying enough attention to the effective application of market-based instruments, although most of the activities in the field of energy efficiency from the economic side are quite profitable. The authors suggested the use of the methodology of project management to the management of energy-saving measures, new approaches to the place and role of project management in the hierarchy of guidance. As a result, this innovation can improve the competitiveness of enterprises. The conclusions that the energy-saving project management allows you to get the best results for their implementation by reducing the time, resources, risk reduction.

  12. 78 FR 64425 - Current Good Manufacturing Practice and Hazard Analysis and Risk-Based Preventive Controls for...

    Science.gov (United States)

    2013-10-29

    ..., 507, and 579 [Docket No. FDA-2011-N-0922] Current Good Manufacturing Practice and Hazard Analysis and... requirements for current good manufacturing practice and hazard analysis and risk-based preventive controls for..., packing, or holding of animal food in two ways. First, it would create new current good manufacturing...

  13. 78 FR 69604 - Current Good Manufacturing Practice and Hazard Analysis and Risk-Based Preventive Controls for...

    Science.gov (United States)

    2013-11-20

    ... Federal Register of January 16, 2013 (78 FR 3646), entitled ``Current Good Manufacturing Practice and... a proposed rule entitled ``Current Good Manufacturing Practice and Hazard Analysis and Risk-Based..., 114, 117, 120, 123, 129, 179, and 211 [Docket No. FDA-2011-N-0920] RIN 0910-AG36 Current Good...

  14. The Impact of Project Role on Perceptions of Risk and Performance in Information Technology Software Development: A Comparative Analysis

    Science.gov (United States)

    Okongo, James

    2014-01-01

    The failure rate of information technology (IT) development projects is a significant concern for today's organizations. Perceptions of IT project risk and project performance have been identified as important factors by scholars studying the topic, and Wallace, Keil, and Rai (2004a) developed a survey instrument to measure how dimensions of…

  15. Differences in flood hazard projections in Europe – their causes and consequences for decision making

    Science.gov (United States)

    Kundzewicz, Z. W.; Krysanova, V.; Dankers, R.; Hirabayashi, Y.; Kanae, S.; Hattermann, F. F.; Huang, S.; Milly, Paul C.D.; Stoffel, M.; Driessen, P.P.J.; Matczak, P.; Quevauviller, P.; Schellnhuber, H.-J.

    2017-01-01

    This paper interprets differences in flood hazard projections over Europe and identifies likely sources of discrepancy. Further, it discusses potential implications of these differences for flood risk reduction and adaptation to climate change. The discrepancy in flood hazard projections raises caution, especially among decision makers in charge of water resources management, flood risk reduction, and climate change adaptation at regional to local scales. Because it is naïve to expect availability of trustworthy quantitative projections of future flood hazard, in order to reduce flood risk one should focus attention on mapping of current and future risks and vulnerability hotspots and improve the situation there. Although an intercomparison of flood hazard projections is done in this paper and differences are identified and interpreted, it does not seems possible to recommend which large-scale studies may be considered most credible in particular areas of Europe.

  16. Hedging Financial Risks in the Economic Practices of Small Business: Current Imperatives

    Directory of Open Access Journals (Sweden)

    Kolomiyets Ganna M.

    2017-04-01

    Full Text Available The article considers the need to update approaches to hedging the financial risks of small businesses. Reducing the probability of financial costs and losses is of continuing relevance. It appears to be especially critical for small businesses. Small business plays a significant role in the country’s economic system as creator of jobs and as a producer of goods and services that adapts quickly to changing consumer requirements. However, its access to credit resources has certain limitations. The instability of the economic environment by individual factors can affect small businesses not less, and sometimes even more than large and medium-sized businesses. Design of the risk-management in terms of small business needs to be updated. In the current context, there is a need in re-evaluating that the efficient financial risk management can only be carried out in a complex of all the enterprise’s risks, with an increase in the planning horizon and the identification of obstacles to achieving the objective set.

  17. Risk assessment based on current release standards for radioactive surface contamination

    International Nuclear Information System (INIS)

    Chen, S.Y.

    1993-09-01

    Standards for uncontrolled releases of radioactive surface contamination have been in existence in the United States for about two decades. Such standards have been issued by various agencies, including the US Department of Energy. This paper reviews the technical basis of published standards, identifies areas in need of revision, provides risk interpretations based on current technical knowledge and the regulatory environment, and offers suggestions for improvements

  18. Development of Optimization method about Capital Structure and Senior-Sub Structure by considering Project-Risk

    Science.gov (United States)

    Kawamoto, Shigeru; Ikeda, Yuichi; Fukui, Chihiro; Tateshita, Fumihiko

    Private finance initiative is a business scheme that materializes social infrastructure and public services by utilizing private-sector resources. In this paper we propose a new method to optimize capital structure, which is the ratio of capital to debt, and senior-sub structure, which is the ratio of senior loan to subordinated loan, for private finance initiative. We make the quantitative analysis of a private finance initiative's project using the proposed method. We analyze trade-off structure between risk and return in the project, and optimize capital structure and senior-sub structure. The method we propose helps to improve financial stability of the project, and to make a fund raising plan that is expected to be reasonable for project sponsor and moneylender.

  19. Insights from implementation of a risk management methodology

    International Nuclear Information System (INIS)

    Mahn, J.A.; Germann, R.P.; Jacobs, R.R.

    1992-01-01

    In 1988, GPU Nuclear (GPUN) Corporation embarked on a research effort to identify or develop an appropriate methodology for proactively managing risks. The objective of this effort was to increase its ability to identify potential risks and to aid resource allocation decision making for risk control. Such a methodology was presented at a risk management symposium sponsored by GPUN in September of 1989. A pilot project based on this methodology has been conducted at GPUN to test and validate the elements of the methodology and to compare the results of its application with current corporate methods for guiding risk decision making. The pilot project also led to a follow-up policy-capturing study to elicit information about the various risk decision-making models of GPUN decision makers. The combination of these endeavors provided an opportunity to gain numerous insights with respect to understanding the real value of a risk management process, obtaining acceptance of and commitment to risk management and improving operational aspects of the methodology

  20. Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant

    International Nuclear Information System (INIS)

    Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.

    1993-12-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant