WorldWideScience

Sample records for current licensing requirements

  1. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  2. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  3. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  4. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  5. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  6. Status of the U.S. nuclear option, conditions leading to its resurgence, and current licensing requirements

    International Nuclear Information System (INIS)

    Ioannidi, J.

    2007-01-01

    The projected increase in electricity demand, increased concern over emissions along with more stringent emission requirements, volatility of the gas and oil supplies and prices, and the convergence of favourable conditions and legislation make nuclear power a practical option for meeting future electricity base-load demands. (author)

  7. Current uranium mill licensing issues

    International Nuclear Information System (INIS)

    Scarano, R.A.

    1977-01-01

    The problems encountered to insure environmentally safe mining and milling of uranium ores are reviewed. Emphasis is placed on the management of tailings resulting from milling operations. It is pointed out that although the concentration of radioactivity in the tailings is relatively low, control measures are necessary because of the large quantities involved and because of the long half-life of the parent radionuclides present. The major concerns with mill tailings are radon release to the atmosphere and isolation of the tailings from the human environment. Since it is anticipated that the amount of tailings created by the year 2000 will be more than an order of magnitude greater than the quantities that have been generated during the past 30 years, it is recommended that all mill tailings storage areas be located remote from public contact and in areas such that disruption and dispersion by natural forces and seepage of toxic materials into ground water systems are reduced to the maximum extent achievable. Technical issues that receive attention during the NRC licensing process for uranium mills and the preparation of environmental impact statements are discussed briefly

  8. 7 CFR 46.3 - License required.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE MARKETING OF PERISHABLE AGRICULTURAL COMMODITIES REGULATIONS (OTHER... considered to result in separate firms and, therefore, do not require separate licenses. ...

  9. Licensing procedure and requirements in the FRG

    International Nuclear Information System (INIS)

    Brosche, D.

    1981-01-01

    The investigations of the different dynamic stresses of pressure suppression systems after the Wuergassen incident in 1972 and their theoretical and experimental solutions required an extraordinary effort from all participants of the licensing procedures. As a consequence of these new problems a lot of mathematical models and computer codes had been developed and a lot of experimental work had been performed. Numerous highly qualified scientists and engineers had been involved for a long time in the licensing procedures and innumerable discussions had been necessary. These investigations and discussions had a great influence on the licensing procedures and on the project running. Too pessimistic assumptions and wrong interpretations of experiments led to fictitious problems and a lot of time and money was necessary to overcome these difficulties. Finally at 1977 it could be proved that the construction was able to control stresses so that additional investigations were not necessary. (orig./HP)

  10. HTR-PM Safety requirement and Licensing experience

    International Nuclear Information System (INIS)

    Li Fu; Zhang Zuoyi; Dong Yujie; Wu Zongxin; Sun Yuliang

    2014-01-01

    HTR-PM is a 200MWe modular pebble bed high temperature reactor demonstration plant which is being built in Shidao Bay, Weihai, Shandong, China. The main design parameters of HTR-PM were fixed in 2006, the basic design was completed in 2008. The review of Preliminary Safety Analysis Report (PSAR) of HTR-PM was started in April 2008, completed in September 2009. In general, HTR- PM design complies with the current safety requirement for nuclear power plant in China, no special standards are developed for modular HTR. Anyway, Chinese Nuclear Safety Authority, together with the designers, developed some dedicated design criteria for key systems and components and published the guideline for the review of safety analysis report of HTR-PM, based on the experiences from licensing of HTR-10 and new development of nuclear safety. The probabilistic safety goal for HTR-PM was also defined by the safety authority. The review of HTR-PM PSAR lasted for one and a half years, with 3 dialogues meetings and 8 topics meetings, with more than 2000 worksheets and answer sheets. The heavily discussed topics during the PSAR review process included: the requirement for the sub-atmospheric ventilation system, the utilization of PSA in design process, the scope of beyond design basis accidents, the requirement for the qualification of TRISO coating particle fuel, and etc. Because of the characteristics of first of a kind for the demonstration plant, the safety authority emphasized the requirement for the experiment and validation, the PSAR was licensed with certain licensing conditions. The whole licensing process was under control, and was re-evaluated again after Fukushima accident to be shown that the design of HTR-PM complies with current safety requirement. This is a good example for how to license a new reactor. (author)

  11. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  12. 22 CFR 129.6 - Requirement for license/approval.

    Science.gov (United States)

    2010-04-01

    ... LICENSING OF BROKERS § 129.6 Requirement for license/approval. (a) No person may engage in the business of... member country of that Organization, Australia, Japan, New Zealand, or South Korea, except in the case of...

  13. Current safety issues of CANDU licensing

    International Nuclear Information System (INIS)

    Lee, Y.; Natalizio, A.

    1994-01-01

    As requested by Korea Institute of Nuclear Safety(KINS), the status of five generic licensing issues has been examined and their potential impact on a new plant that would be constructed in Canada has been evaluated. The results and conclusions of this evaluation are summarized as follows: steam explosion in calandria, hydrogen explosion in containment, use of PSA in reactor licensing, human factors, safety critical software

  14. Stability in licensing requirements: a technical perspective

    International Nuclear Information System (INIS)

    Szalay, R.A.

    1978-01-01

    The serious difficulties encountered in the licensing procedure for nuclear power plants in the United States have resulted in the elaboration of a Bill on the siting and licensing of nuclear installations for the purpose of reforming the present system. The author fears, however, that this Bill will not reduce the complexity of present regulations and will be unable to reach the object sought which is to reduce the length of the procedure; he analyses the technical and political reasons underlying this situation, and in particular the role of the staff of the Nuclear Regulatory Commission. (NEA) [fr

  15. U.S. regulatory requirements for nuclear plant license renewal: The B and W Owners Group License Renewal Program

    International Nuclear Information System (INIS)

    Staudinger, Deborah K.

    2004-01-01

    This paper discusses the current U.S. Regulatory Requirements for License Renewal and describes the Babcock and Wilcox Owners Group (B and WOG) Generic License Renewal Program (GLRP). The B and W owners, recognizing the need to obtain the maximum life for their nuclear generating units, embarked on a program to renew the licenses of the seven reactors in accordance with the requirements of the Atomic Energy Act of 1954 and further defined by Title 10 of the Code of Federal Regulation Part 54 (10 CFR 54). These reactors, owned by five separate utilities, are Pressurized Water Reactors (PWR) ranging in net rated capacity from approximately 800 to 900 MW. The plants, predominately constructed in the 70s, have USNRC Operating Licenses that expire between 2013 to 2017. (author)

  16. TMI-related requirements for new operating licenses. Technical report

    International Nuclear Information System (INIS)

    1980-06-01

    There are four types of TMI-related requirements and actions approved by the Commission for new operating licenses: (1) those required to be completed by a license applicant prior to receiving a fuel-loading and low-power testing license, (2) those required to be completed by a license applicant prior to receiving a license to operate at appreciable power levels up to full power, (3) those the NRC will take prior to issuing a fuel-loading and low-power testing or a full-power operating license, and (4) those required to be completed by a licensee prior to a specified date. In this report, only those dated requirements that have already been issued are of interest. Other dated requirements are expected to be issued in the future as work progresses in accordance with the TMI Action Plan. This report summarizes the several parts of the list of TMI-related requirements approved by the Commission for new operating licenses

  17. 75 FR 52456 - Customs Broker License Examination Individual Eligibility Requirements

    Science.gov (United States)

    2010-08-26

    ... DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection 19 CFR Part 111 [USCBP-2008-0059; CBP Dec. 10-28] RIN 1651-AA74 Customs Broker License Examination Individual Eligibility Requirements AGENCY: Customs and Border Protection, Department of Homeland Security. ACTION: Final rule...

  18. Current status of LTO licensing programme for Bohunice nuclear power plant

    International Nuclear Information System (INIS)

    Borak, J.; Kupca, L.

    2012-01-01

    The objective of long term operation (LTO) licensing programme for Bohunice nuclear power plant is to demonstrate that the relevant structures and components shall perform their functions throughout the entire LTO period during which they shall meet all the relevant safety requirements. All the activities-which should result in utility's request to obtain the licence for LTO-must be performed in line with the relevant legal basis. As of May 2012, the anticipated duration of currently running programme is thirteen months. All relevant documentation, required by the established legal basis, shall be submitted to the licensing authority one year before the Unit 3 design life expiry. (author)

  19. Nuclear safety requirements for operation licensing of Egyptian research reactors

    International Nuclear Information System (INIS)

    Ahmed, E.E.M.; Rahman, F.A.

    2000-01-01

    From the view of responsibility for health and nuclear safety, this work creates a framework for the application of nuclear regulatory rules to ensure safe operation for the sake of obtaining or maintaining operation licensing for nuclear research reactors. It has been performed according to the recommendations of the IAEA for research reactor safety regulations which clearly states that the scope of the application should include all research reactors being designed, constructed, commissioned, operated, modified or decommissioned. From that concept, the present work establishes a model structure and a computer logic program for a regulatory licensing system (RLS code). It applies both the regulatory inspection and enforcement regulatory rules on the different licensing process stages. The present established RLS code is then applied to the Egyptian Research Reactors, namely; the first ET-RR-1, which was constructed and still operating since 1961, and the second MPR research reactor (ET-RR-2) which is now in the preliminary operation stage. The results showed that for the ET-RR-1 reactor, all operational activities, including maintenance, in-service inspection, renewal, modification and experiments should meet the appropriate regulatory compliance action program. Also, the results showed that for the new MPR research reactor (ET-RR-2), all commissioning and operational stages should also meet the regulatory inspection and enforcement action program of the operational licensing safety requirements. (author)

  20. Cyclotron facilities in Brazil: Current status and licensing aspects

    International Nuclear Information System (INIS)

    Facure, A.; Carvalho, S.M.; Di Prinzio, R.; Silveira, C.S.; Gasparian, P.B.R.; Franca, W.F.

    2017-01-01

    Positron Emission Tomography (PET) is a highly sensitive and accurate nuclear medicine imaging technology but the major problem of this technique is the use of radioisotopes with short half-life, less than two hours. The production and selling of short half-life radioisotopes used to be monopoly of the Brazilian Government. In 2006, a Constitutional Amendment revoked the state monopoly due to the need for the use of short half-life radioisotopes in nuclear medicine centers very far from the government production facilities. The aim of this study is to describe the current status of short half-life radioisotopes production in Brazil and discuss some licensing process. In Brazil, as has been occurring worldwide, the number of nuclear medicine centers is increasing. Currently there are 123 services performing PET scans in Brazil. There are 14 cyclotrons operating in Brazil. The type of licensing process conducted in Brazil does not take into account the population density of each state, with a free competition model being adopted. Because of this there is a lot of equipment concentrated in the Southeast and no cyclotrons operating in the Northern part of the country. One of the biggest obstacles during the licensing process is the designation of qualified personnel as operation workers and radiation safety officers. The number of cyclotron accelerators and PET/CT equipment increased in recent years. However, a number of external factors such as the distance from the nuclear medicine centers, and qualified personnel have proved crucial for the economic viability of this type of facility. (author)

  1. Cyclotron facilities in Brazil: Current status and licensing aspects

    Energy Technology Data Exchange (ETDEWEB)

    Facure, A.; Carvalho, S.M.; Di Prinzio, R.; Silveira, C.S.; Gasparian, P.B.R.; Franca, W.F., E-mail: facure@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil)

    2017-09-01

    Positron Emission Tomography (PET) is a highly sensitive and accurate nuclear medicine imaging technology but the major problem of this technique is the use of radioisotopes with short half-life, less than two hours. The production and selling of short half-life radioisotopes used to be monopoly of the Brazilian Government. In 2006, a Constitutional Amendment revoked the state monopoly due to the need for the use of short half-life radioisotopes in nuclear medicine centers very far from the government production facilities. The aim of this study is to describe the current status of short half-life radioisotopes production in Brazil and discuss some licensing process. In Brazil, as has been occurring worldwide, the number of nuclear medicine centers is increasing. Currently there are 123 services performing PET scans in Brazil. There are 14 cyclotrons operating in Brazil. The type of licensing process conducted in Brazil does not take into account the population density of each state, with a free competition model being adopted. Because of this there is a lot of equipment concentrated in the Southeast and no cyclotrons operating in the Northern part of the country. One of the biggest obstacles during the licensing process is the designation of qualified personnel as operation workers and radiation safety officers. The number of cyclotron accelerators and PET/CT equipment increased in recent years. However, a number of external factors such as the distance from the nuclear medicine centers, and qualified personnel have proved crucial for the economic viability of this type of facility. (author)

  2. Compliance with NRC subsystem requirements in the repository licensing process

    International Nuclear Information System (INIS)

    Minwalla, H.

    1994-01-01

    Section 121 of the Nuclear Waste Policy Act of 1982 requires the Nuclear Regulatory Commission (Commission) to issue technical requirements and criteria, for the use of a system of multiple barriers in the design of the repository, that are not inconsistent with any comparable standard promulgated by the Environmental Protection Agency (EPA). The Administrator of the EPA is required to promulgate generally applicable standards for protection of the general environment from offsite releases from radioactive material in repositories. The Commission's regulations pertaining to geologic repositories are provided in 10 CFR part 60. The Commission has provided in 10 CFR 60.112 the overall post-closure system performance objective which is used to demonstrate compliance with the EPA high-level waste (HLW) disposal standard. In addition, the Commission has provided, in 10 CFR 60.113, subsystem performance requirements for substantially complete containment, fractional release rate, and groundwater travel time; however, none of these subsystem performance requirements have a causal technical nexus with the EPA HLW disposal standard. This paper examines the issue of compliance with the conflicting dual regulatory role of subsystem performance requirements in the repository licensing process and recommends several approaches that would appropriately define the role of subsystem performance requirements in the repository licensing process

  3. New Jersey's license plate decal requirement for graduated driver licenses: attitudes of parents and teenagers, observed decal use, and citations for teenage driving violations.

    Science.gov (United States)

    McCartt, Anne T; Oesch, Nathan J; Williams, Allan F; Powell, Tara Casanova

    2013-01-01

    On May 1, 2010, New Jersey implemented a law requiring teenagers with learner's permits or probationary licenses to display reflective decals on the front and rear license plates when they drive. The current study examined attitudes of parents and teenagers toward this requirement, use of decals, and reported violations and police enforcement of the graduated driver license law. Statewide telephone surveys of representative samples of parents and teenagers were conducted in February to April 2010 and March to June 2011. Use of decals among probationary license holders was observed at 4 high schools in fall 2010 and in spring 2011 and hand-out surveys were distributed. Data on citations issued for violations of the graduated driver license law were obtained. When interviewed in spring 2011, a large majority of parents of probationary license holders, parents of learner's permit holders, and teenagers with probationary licenses disapproved of decals for probationary licenses. About two thirds of both sets of parents and about half of teenagers disapproved of decals for learner's permits. Support for decals for both license types declined significantly from 2010 to 2011. For parents and teenagers alike, opposition was mainly attributed to concern about identifying and/or targeting teenage drivers by other drivers, predators, or police. In 2011, 77 percent of parents of probationary license holders said that their teenagers had decals for the vehicles driven most often; 46 percent said their teenagers always used decals. Fifty-six percent of parents of learner's permit holders said that their teenagers had decals for the vehicles driven most often; 37 percent said that their teenagers always used decals. Teenagers' reported violations of license restrictions either increased or were similar in 2011 compared to 2010. Observed rates of decal use by probationary license holders at high schools in spring 2011 ranged from 24 to 64 percent. The number of statewide citations

  4. 12 CFR 564.3 - Appraisals required; transactions requiring a State certified or licensed appraiser.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Appraisals required; transactions requiring a State certified or licensed appraiser. 564.3 Section 564.3 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY APPRAISALS § 564.3 Appraisals required; transactions requiring a State...

  5. Technology neutral licensing requirements: have we been successful?

    International Nuclear Information System (INIS)

    Jamieson, T.

    2009-01-01

    The Canadian Nuclear Safety Commission (CNSC) is Canada's nuclear regulator. In preparation for the licensing of the next generation of nuclear reactors in Canada, the CNSC has made major changes in its processes and procedures associated with all aspects of the licensing life cycle. These include: development of key regulatory documents outlining the CNSC expectations for the design and siting of new reactors; creation of applicant guidelines for completing licensing applications; creation of a comprehensive set of review guides, specifying how topics in applications are to be reviewed; performing pre-project design reviews for proposed new reactor technologies; and streamlining processes wherever possible, such as performing the environmental assessment and license to prepare site activities in parallel. The predicted workload associated with the nuclear renaissance in Canada is real. The CNSC is currently performing: 4 pre-project design reviews (for AECL's ACR-1000 and EC-6, Areva's EPR and Westinghouse's AP-1000), has received applications for 4 new builds (at Darlington, Bruce, Nanticoke and in Alberta) and is in the midst of performing the combined environmental assessment and license to prepare site phases for these sites. This is in addition to the work associated with: the licensing of new uranium mines; oversight of the existing reactor fleet; refurbishments at Bruce/Gentilly/Point Lepreau; license renewal for the NRU reactor; and oversight of our general client base of over 5000 licensees. In this presentation, experience to date with these new processes and procedures will be discussed, including: status of the current new build projects; anticipated new activities; lessons learned, especially the technology neutral approach; application to our other licensed activities, including non-power reactors; and work underway to further develop CNSC methods. Qualifications Needed to Design, Construct and Manufacture Nuclear Systems and Equipment, C. Voutsinos

  6. 47 CFR 97.5 - Station license required.

    Science.gov (United States)

    2010-10-01

    .... (3) A military recreation station license grant. A military recreation station license grant may be... States military recreational premises where the station is situated. The person must not be a... the balance of the license term and the suspension is still in effect, suspended for the balance of...

  7. 21 CFR 558.4 - Requirement of a medicated feed mill license.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Requirement of a medicated feed mill license. 558... Provisions § 558.4 Requirement of a medicated feed mill license. (a) A feed manufacturing facility must possess a medicated feed mill license in order to manufacture a Type B or Type C medicated feed from a...

  8. Application and licensing requirements of the Framatome ANP RLBLOCA methodology

    International Nuclear Information System (INIS)

    Martin, R.P.; Dunn, B.M.

    2004-01-01

    The Framatome ANP Realistic Large-Break LOCA methodology (FANP RLBLOCA) is an analysis approach approved by the US NRC for supporting the licensing basis of 3- and 4-loop Westinghouse PWRs and CE 2x4 PWRs. It was developed consistent with the NRC's Code Scaling, Applicability, and Uncertainty (CSAU) methodology for performing best-estimate large-break LOCAs. The CSAU methodology consists of three key elements with the second and third element addressing uncertainty identification and application. Unique to the CSAU methodology is the use of engineering judgment and the Process Identification and Ranking Table (PIRT) defined in the first element to lay the groundwork for achieving the ultimate goal of quantifying the total uncertainty in predicted measures of interest associated with the large-break LOCA. It is the PIRT that not only directs the methodology development, but also directs the methodology review. While the FANP RLBLOCA methodology was generically approved, a plant-specific application is customized in two ways addressing how the unique plant characterization 1) is translated to code input and 2) relates to the unique methodology licensing requirements. Related to the former, plants are required by 10 CFR 50.36 to define a technical specification limiting condition for operation based on the following criteria: 1. Installed instrumentation that is used in the control room to detect, and indicate, a significant abnormal degradation of the reactor coolant pressure boundary. 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier. 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a

  9. Licensing evaluation of CANDU-PHW nuclear power plants relative to U.S. regulatory requirements

    International Nuclear Information System (INIS)

    Erp, J.B. van

    1978-01-01

    Differences between the U.S. and Canadian approach to safety and licensing are discussed. U.S. regulatory requirements are evaluated as regards their applicability to CANDU-PHW reactors; vice-versa the CANDU-PHW reactor is evaluated with respect to current Regulatory Requirements and Guides. A number of design modifications are proposed to be incorporated into the CANDU-PHW reactor in order to facilitate its introduction into the U.S. These modifications are proposed solely for the purpose of maintaining consistency within the current U.S. regulatory system and not out of a need to improve the safety of current-design CANDU-PHW nuclear power plants. A number of issues are identified which still require resolution. Most of these issues are concerned with design areas not (yet) covered by the ASME code. (author)

  10. Small modular reactors: current status, economic aspects and licensing

    International Nuclear Information System (INIS)

    Zimbron E, E.; Puente E, F.

    2014-10-01

    Interest for nuclear energy had resurgence since the beginning of the new century. This was a consequence of the new world conditions and needs: increasing energy demands (mainly from developing countries), awareness of the importance of energetic security and the necessity of limiting carbon emissions. In this nuclear boom, Small Modular Reactors (SMRs) develop and start to consolidate as a viable option for the present energy market. Their modular characteristics, lower initial capital cost, passive safety features and their niche applications, situate them as a technology with various advantages. The following study will present and analysis that will help to comprehend the SMRs present status. Information will show planned reactors, reactors in construction and in operation, advantages and challenges of their implementation, relevant economic aspects and important licensing factors that need to be highlighted. The analysis showed that the SMR technology is still in an initial stage that could reach and important development point in the next ten years. In this period, many of the reactors that are in design stage or that are through their licensing process might be constructed and could be getting ready for a commercial status. On the other hand, it has been observed that there are two main economic factors that need to be considered for any SMRs implementation project. First, the costs (initial, operation, maintenance, fuel and decommissioning) and second their possible niche market applications. Additionally, it has been noted that the licensing process is one of the greatest challenges for SMR general development. Licensing is mainly related to topic such as Emergency Planning Zone, first-of-a-kind engineering, passive safety features, proliferation resistance, multiple module designs and staffing. Previous information will serve as a base for carrying out a feasibility assessment analysis for SMR in Mexico. This part will be the last section of the project

  11. Small modular reactors: current status, economic aspects and licensing

    Energy Technology Data Exchange (ETDEWEB)

    Zimbron E, E. [Instituto Tecnologico de Estudios Superiores de Monterrey, Campus Santa Fe, Av. Carlos Lazo No. 100, Santa Fe, 01389 Mexico D. F. (Mexico); Puente E, F., E-mail: erick.zimbron@gmail.com [ININ, Direccion de Investigacion Cientifica, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2014-10-15

    Interest for nuclear energy had resurgence since the beginning of the new century. This was a consequence of the new world conditions and needs: increasing energy demands (mainly from developing countries), awareness of the importance of energetic security and the necessity of limiting carbon emissions. In this nuclear boom, Small Modular Reactors (SMRs) develop and start to consolidate as a viable option for the present energy market. Their modular characteristics, lower initial capital cost, passive safety features and their niche applications, situate them as a technology with various advantages. The following study will present and analysis that will help to comprehend the SMRs present status. Information will show planned reactors, reactors in construction and in operation, advantages and challenges of their implementation, relevant economic aspects and important licensing factors that need to be highlighted. The analysis showed that the SMR technology is still in an initial stage that could reach and important development point in the next ten years. In this period, many of the reactors that are in design stage or that are through their licensing process might be constructed and could be getting ready for a commercial status. On the other hand, it has been observed that there are two main economic factors that need to be considered for any SMRs implementation project. First, the costs (initial, operation, maintenance, fuel and decommissioning) and second their possible niche market applications. Additionally, it has been noted that the licensing process is one of the greatest challenges for SMR general development. Licensing is mainly related to topic such as Emergency Planning Zone, first-of-a-kind engineering, passive safety features, proliferation resistance, multiple module designs and staffing. Previous information will serve as a base for carrying out a feasibility assessment analysis for SMR in Mexico. This part will be the last section of the project

  12. 47 CFR 80.13 - Station license required.

    Science.gov (United States)

    2010-10-01

    ... signals using a marine radio operating in the 156-162 MHz band, any type of AIS, any type of EPIRB, and any type of radar installation. All other transmissions must be authorized under a ship station... paragraph (c) of this section, stations in the maritime service must be licensed by the FCC either...

  13. Safety and licensing requirements in the Republic of South Africa

    International Nuclear Information System (INIS)

    Simpson, D.M.; Langford, E.L.

    1986-01-01

    The principles for licensing of nuclear installations in South Africa are based on the control of mortality risk to the operators of an installation and the population resident in the vicinity of the site. This paper describes the development of this safety philosophy, and the nuclear licensing process used in this country. The structure of the nuclear regulatory function is briefly described, including the respective roles of the Atomic Energy Corporation, Licencing Branch and the Council for Nuclear Safety. The development of risk criteria and quantitative release magnitude-probability criteria for radioactive material is outlined. Tasks that have to be undertaken by a potential waste disposal site licensee before a site licence is issued are described. Once the facility is commissioned periodic monitoring procedures will have to be adopted throughout the lifetime of the facility. The scope of typical monitoring activities is outlined and the ongoing analyses to be performed and the records to be kept are discussed

  14. Nuclear fuel licensing requirements: present status and future trends

    International Nuclear Information System (INIS)

    Gantchev, T.; Vitkova, M.; Gorinov, I.; Datcheva, D.; Rashkova, N.

    2001-01-01

    The nuclear fuel licensing process must be directed to establishing of criteria for licensing (fuel safety criteria) and relationship between safety limits, technical specifications and operational conditions. This paper discusses the fuel safety criteria as used by NRC and Russian vendor. A survey on the available fuel behavior, modeling and related computer codes is given with respect to help the licensing process including new safety features of general changes in fuel design and operational conditions. Several types of computer codes that are used in safety analysis are sensitive to fuel-related parameters. The need for further code development and verification has been stated on many occasions: new design elements, such as different cladding materials, higher burnup, different fuel microstructure and use of MOX fuel can affect the performance of these codes. Regulatory inspection practices during operation and refueling in different countries are also shown. Future trends are discussed in particular with regard to the coming high burnup and to new core management schemes

  15. Licensing requirements for nuclear merchant ships in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schafstall, H.-G.

    1978-01-01

    The procedure of approval in the Federal Republic of Germany will be discussed, referring to the participated authorities and organizations. Rules and guidelines relevant for licensing are mentioned in the frame of legal positions. After presentation of general aspects of basic licensing requirements more detailed information is given relative to their accomplishment demonstrated on the German Nuclear Contained Ship NCS-80-Project

  16. 10 CFR 32.26 - Gas and aerosol detectors containing byproduct material: Requirements for license to manufacture...

    Science.gov (United States)

    2010-01-01

    ...: Requirements for license to manufacture, process, produce, or initially transfer. 32.26 Section 32.26 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS... byproduct material: Requirements for license to manufacture, process, produce, or initially transfer. An...

  17. Licensed pertussis vaccines in the United States. History and current state.

    Science.gov (United States)

    Klein, Nicola P

    2014-01-01

    The United States switched from whole cell to acellular pertussis vaccines in the 1990s following global concerns with the safety of the whole cell vaccines. Despite high levels of acellular pertussis vaccine coverage, the United States and other countries are experiencing large pertussis outbreaks. The aim of this article is to describe the historical context which led to acellular pertussis vaccine development, focusing on vaccines currently licensed in the US, and to review evidence that waning protection following licensed acellular pertussis vaccines have been significant factors in the widespread reappearance of pertussis.

  18. The current role of simulators for performance evaluations and licensing (case of Mexico)

    International Nuclear Information System (INIS)

    Maldonado A, H.

    1997-01-01

    The main purpose of this paper is to share the experience acquired by the National Commission of Nuclear Safety and Safeguards (CNSNS) during the administration of both certification and licensing operational exams applied to Senior Reactor Operators (SRO) and Reactor OPerators (RO) by using a full-scope simulator. The licensing operational exams are administered to examinate candidates for a SRO or RO license while the certification operational exams are administered to all personnel that possess a SRO or RO license in order to renew their licenses within a six years period. A general description with the most important simulator antecedents from the initial authorization for its usage to provide the ''Initial Simulator Training Course'' until currently in which it has been started the installation and testing performance of a new computer equipment that will improve and increase the simulation capacity of the Laguna Verde Nuclear Power Plant (LVNPP) simulator. In other hand, it is showed the process that the CNSNS will apply during the next verification of the simulator certification which should be performed due to the old computer equipment is being replaced with a more modern computer equipment so that the simulation capability will be improved. The verification process was discussed with the utility personnel and as result of this an agreement has been established to carry into effect this hard task. Finally, the conclusions and recommendations from regulators point of view are presented regarding to the importance of perform a well both evaluation and verification of simulators performance. (author)

  19. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, J D

    1976-04-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria.

  20. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1976-01-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria. (Auth.)

  1. 10 CFR 32.61 - Ice detection devices containing strontium-90; requirements for license to manufacture or...

    Science.gov (United States)

    2010-01-01

    ...; requirements for license to manufacture or initially transfer. 32.61 Section 32.61 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES TO MANUFACTURE OR TRANSFER CERTAIN ITEMS CONTAINING BYPRODUCT MATERIAL... manufacture or initially transfer. An application for a specific license to manufacture or initially transfer...

  2. Licensing requirements for initial commissioning programs in Spain: Application to different PWR designs

    International Nuclear Information System (INIS)

    Munuera, A.; Conde, J.M.; Martinez, J.

    1991-01-01

    This paper describes the overall licensing process in Spain, focusing on the initial commissioning requirements. The significance of this part of the regulatory work is evident both from the licensing and the licensee's points of view. Licensing in Spain is ruled by different laws which determine the general requirements and fix the licensing frame. Being a nuclear technology importer country, the base of the regulatory work lies on the rules and regulations of the country of origin of the planet, with the addition of case specific requirements. The application of this methodology to plants designed in different countries produces licensing processes which are similar to the overall, but very different in its development. It also means a special technical effort on the part of the regulatory body to cope with the problems arising from the use of different technologies and safety standards. The start-up programs from fuel loading to full power of a Westinghouse plant (Vandellos 2) and a Siemens-KWU plant (Trillo 1) are compared from the technical point of view, enhancing the differences that can be relevant for the regulatory work. The difficulties arising from the application of both the German and US concepts are discussed. (orig.)

  3. 12 CFR 14.60 - Qualification and licensing requirements for insurance sales personnel.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Qualification and licensing requirements for insurance sales personnel. 14.60 Section 14.60 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF... insurance product or annuity in any part of its office or on its behalf, unless the person is at all times...

  4. Origin Licensing Requires ATP Binding and Hydrolysis by the MCM Replicative Helicase

    Science.gov (United States)

    Coster, Gideon; Frigola, Jordi; Beuron, Fabienne; Morris, Edward P.; Diffley, John F.X.

    2014-01-01

    Summary Loading of the six related Minichromosome Maintenance (MCM) proteins as head-to-head double hexamers during DNA replication origin licensing is crucial for ensuring once-per-cell-cycle DNA replication in eukaryotic cells. Assembly of these prereplicative complexes (pre-RCs) requires the Origin Recognition Complex (ORC), Cdc6, and Cdt1. ORC, Cdc6, and MCM are members of the AAA+ family of ATPases, and pre-RC assembly requires ATP hydrolysis. Here we show that ORC and Cdc6 mutants defective in ATP hydrolysis are competent for origin licensing. However, ATP hydrolysis by Cdc6 is required to release nonproductive licensing intermediates. We show that ATP binding stabilizes the wild-type MCM hexamer. Moreover, by analyzing MCM containing mutant subunits, we show that ATP binding and hydrolysis by MCM are required for Cdt1 release and double hexamer formation. This work alters our view of how ATP is used by licensing factors to assemble pre-RCs. PMID:25087873

  5. 77 FR 3386 - Export and Reexport License Requirements for Certain Microwave and Millimeter Wave Electronic...

    Science.gov (United States)

    2012-01-24

    ... microwave ``monolithic integrated circuits'' power amplifiers that meet certain criteria with respect to... packaged microwave ``monolithic integrated circuits'' (MMIC) power amplifiers that meet certain criteria.... 110825537-2038-02] RIN 0694-AF38 Export and Reexport License Requirements for Certain Microwave and...

  6. 15 CFR 738.4 - Determining whether a license is required.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Determining whether a license is required. 738.4 Section 738.4 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE EXPORT ADMINISTRATION REGULATIONS...

  7. Licensed pertussis vaccines in the United States: History and current state

    OpenAIRE

    Klein, Nicola P

    2014-01-01

    The United States switched from whole cell to acellular pertussis vaccines in the 1990s following global concerns with the safety of the whole cell vaccines. Despite high levels of acellular pertussis vaccine coverage, the United States and other countries are experiencing large pertussis outbreaks. The aim of this article is to describe the historical context which led to acellular pertussis vaccine development, focusing on vaccines currently licensed in the US, and to review evidence that w...

  8. Reactor coolant pump service life evaluation for current life cycle optimization and license renewal

    International Nuclear Information System (INIS)

    Doroshuk, B.W.; Berto, D.S.; Robles, M.

    1990-01-01

    This paper reports that as part of the plant life cycle management and license renewal program, Baltimore Gas and Electric Company (BG and E) has completed a service life evaluation of their reactor coolant pumps, funded jointly by EPRI and performed by ABB Combustion Engineering Nuclear Power. Two of the goals of the BG and E plant life cycle management and license renewal program, and of this current evaluation, are to identify actions which would optimize current plant operation, and ensure that license renewal remains a viable option. The reactor coolant pumps (RCPs) at BG and E's Calvert Cliffs Units 1 and 2 are Byron Jackson pumps with a diffuser and a single suction. This pump design is also used in many other nuclear plants. The RCP service life evaluation assessed the effect of all plausible age-related degradation mechanisms (ARDMs) on the RCP components. Cyclic fatigue and thermal embrittlement were two ARDMs identified as having a high potential to limit the service life of the pump case. The pump case is a primary pressure boundary component. Hence, ensuring its continued structural integrity is important

  9. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  10. Impact of New Radiation Safety Standards on Licensing Requirements of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Strohal, P.; Subasic, D.; Valcic, I.

    1996-01-01

    As the outcomes of the newly introduced safety philosophies, new and more strict safety design requirements for nuclear installation are expected to be introduced. New in-depth defence measures should be incorporated into the design and operation procedure for a nuclear installation, to compensate for potential failures in protection or safety measures. The new requirements will also apply to licensing of NPP's operation as well as to licensing of nuclear sites, especially for radioactive waste disposal sites. This paper intends to give an overview of possible impacts of new internationally agreed basic safety standards with respect to NPP and related technologies. Recently issued new basic safety standards for radiation protection are introducing some new safety principles which may have essential impact on future licensing requirements regarding nuclear power plants and radioactive waste installations. These new standards recognize exposures under normal conditions ('practices') and intervention conditions. The term interventions describes the human activities that seek to reduce the existing radiation exposure or existing likelihood of incurring exposure which is not part of a controlled practice. The other new development in safety standards is the introduction of so called potential exposure based on the experience gained from a number of radiation accidents. This exposure is not expected to be delivered with certainty but it may result from an accident at a source or owing to an event or sequence of events of a probabilistic nature, including equipment failures and operating errors. (author)

  11. Current regulatory and licensing status for byproduct sources, facilities and applications

    International Nuclear Information System (INIS)

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig

  12. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  13. CNAAA spent fuel complementary storage building (UFC) construction and licensing: an overview of current status

    International Nuclear Information System (INIS)

    Lima Neto, Bertino do Carmo; Pacifi, Cicero Durval

    2013-01-01

    , representing a similar solution used in all the three CNAAA units to store the spent fuel assemblies. Taking into account the above described aspects, this paper aims to compare the licensing requirements included in the safety analysis report prepared for external spent fuel wet storage facilities in USA (NRC Regulatory Guide) and Switzerland (ENSI - Swiss Federal Nuclear Safety Inspectorate), considering that the standard formats applied by CNEN - the Brazilian Nuclear Regulatory Authority - are based on USNRC recommendations and Eletrobras Eletronuclear plans, as a preliminary idea, to take the Goesgen NPP - KKG (Switzerland) spent fuel facility as a reference one for of the UFC. (author)

  14. Testing, licensing, and code requirements for seismic isolation systems (for nuclear power plants)

    International Nuclear Information System (INIS)

    Seidensticker, R.W.

    1987-01-01

    The use of seismic isolation as an earthquake hazard mitigation strategy for nuclear reactor power plants is rapidly receiving interest throughout the world. Seismic isolation has already been used on at least two French PWR plants, was to have been used for plants to be built in Iran, and is under serious consideration for advanced LMR plants (in the US, UK, France, and Japan). In addition, there is a growing use of seismic isolation throughout the world for other critical facilities such as hospitals, emergency facilities, buildings with very high-cost equipment (e.g., computers) and as a strategy to reduce loss of life and expensive equipment in earthquakes. Such a design approach is in complete contrast to the conventional seismic design strategy in which the structure and components are provided with sufficient strength and ductility to resist the earthquake forces and to prevent structural collapses or failure. The use of seismic isolation for nuclear plants can, therefore, be expected to be a significant licensing issue. For isolation, the licensing process must shift away in large measure from the superstructure and concentrate on the behavior of the seismic isolation system. This paper is not intended to promote the advantages of seismic isolation system, but to explore in some detail those technical issues which must be satisfactorily addressed to achieve full licensability of the use of seismic isolation as a viable, attractive and economical alternative to current traditional design approaches. Special problems and topics associated with testing and codes and standards development are addressed. A positive program for approach or strategy to secure licensing is presented

  15. Testing, licensing, and code requirements for seismic isolation systems (for nuclear power plants)

    Energy Technology Data Exchange (ETDEWEB)

    Seidensticker, R.W.

    1987-01-01

    The use of seismic isolation as an earthquake hazard mitigation strategy for nuclear reactor power plants is rapidly receiving interest throughout the world. Seismic isolation has already been used on at least two French PWR plants, was to have been used for plants to be built in Iran, and is under serious consideration for advanced LMR plants (in the US, UK, France, and Japan). In addition, there is a growing use of seismic isolation throughout the world for other critical facilities such as hospitals, emergency facilities, buildings with very high-cost equipment (e.g., computers) and as a strategy to reduce loss of life and expensive equipment in earthquakes. Such a design approach is in complete contrast to the conventional seismic design strategy in which the structure and components are provided with sufficient strength and ductility to resist the earthquake forces and to prevent structural collapses or failure. The use of seismic isolation for nuclear plants can, therefore, be expected to be a significant licensing issue. For isolation, the licensing process must shift away in large measure from the superstructure and concentrate on the behavior of the seismic isolation system. This paper is not intended to promote the advantages of seismic isolation system, but to explore in some detail those technical issues which must be satisfactorily addressed to achieve full licensability of the use of seismic isolation as a viable, attractive and economical alternative to current traditional design approaches. Special problems and topics associated with testing and codes and standards development are addressed. A positive program for approach or strategy to secure licensing is presented.

  16. Environmental qualification design for NPP refurbishment to comply with revised licensing requirements

    International Nuclear Information System (INIS)

    MacBeth, M. J.; Hemmings, R. L.

    2002-01-01

    Recent Canadian Nuclear Regulatory decisions have imposed Environmental Qualification (EQ) requirements for twenty-four Reactor Building (RB) airlocks at the four-unit Pickering Nuclear Generating Station-B (PNGS-B) facility. This paper describes the EQ modification design work completed by CANATOM-NPM for the problematic aspects for such projects. The airlocks allow RB access while providing a containment boundary and are designed to prevent a potential breach of containment for all analysed station conditions. Each PNGS-B unit has three large equipment airlocks and three smaller personnel airlocks. The airlocks must function under postulated worst-case design basis accident(DBA) conditions for assigned mission durations. The design must ensure that accident conditions cannot spuriously initiate an un-requested door opening. CANATOM-NPM reviewed site data to specify the necessary EQ modifications required to satisfy licensing requirements while providing a correct and complete as-found record of the existing airlock installation. The design team assessed the installed airlocks configuration against environmental qualification requirements to finalize the list of necessary modifications. A comprehensive, cross-discipline review of proposed design changes was completed to identify any further changes required to satisfy the final EQ licensing goal. The design team also conducted a design review of the EQ modification installation strategy to integrate the design deliverables with the installation team requirements while attempting to minimize necessary outage time for EQ modification installations. This project was completed on schedule and within the cost limitations required by the client with comprehensive, high quality final design packages. Overall improvements were realized for OPG system drawings and the electronic documentation of design data. The EQ modifications designed by CANATOM-NPM will ensure the continued operation of the PNGS-B NPP past December 31

  17. Overview and current management of computerized adaptive testing in licensing/certification examinations

    Directory of Open Access Journals (Sweden)

    Dong Gi Seo

    2017-07-01

    Full Text Available Computerized adaptive testing (CAT has been implemented in high-stakes examinations such as the National Council Licensure Examination-Registered Nurses in the United States since 1994. Subsequently, the National Registry of Emergency Medical Technicians in the United States adopted CAT for certifying emergency medical technicians in 2007. This was done with the goal of introducing the implementation of CAT for medical health licensing examinations. Most implementations of CAT are based on item response theory, which hypothesizes that both the examinee and items have their own characteristics that do not change. There are 5 steps for implementing CAT: first, determining whether the CAT approach is feasible for a given testing program; second, establishing an item bank; third, pretesting, calibrating, and linking item parameters via statistical analysis; fourth, determining the specification for the final CAT related to the 5 components of the CAT algorithm; and finally, deploying the final CAT after specifying all the necessary components. The 5 components of the CAT algorithm are as follows: item bank, starting item, item selection rule, scoring procedure, and termination criterion. CAT management includes content balancing, item analysis, item scoring, standard setting, practice analysis, and item bank updates. Remaining issues include the cost of constructing CAT platforms and deploying the computer technology required to build an item bank. In conclusion, in order to ensure more accurate estimations of examinees’ ability, CAT may be a good option for national licensing examinations. Measurement theory can support its implementation for high-stakes examinations.

  18. Meeting United States re-licensing requirements related to environmental protection using innovative technologies

    International Nuclear Information System (INIS)

    Taft, E.P.; Winchell, F.C.; Cook, T.C.

    1998-01-01

    Procedure for meeting re-licensing requirements related to environmental protection and an overview of several new and emerging technologies regarding the development of ways to prevent fish passage through hydraulic turbines at hydroelectric power dams is described. Fish mortality and injury has long been a concern in the hydroelectric industry and research and development efforts have been ongoing since the 1970s to prevent fish passage through turbines. Several new and emerging technologies are examined that have the potential for wide-spread cost-effective applications

  19. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  20. 49 CFR 385.605 - New entrant registration driver's license and drug and alcohol testing requirements.

    Science.gov (United States)

    2010-10-01

    ... America-Domiciled Carriers § 385.605 New entrant registration driver's license and drug and alcohol... carrier must subject each of the drivers described in paragraph (a) of this section to drug and alcohol... 49 Transportation 5 2010-10-01 2010-10-01 false New entrant registration driver's license and drug...

  1. Main features of licensing requirements for nuclear installations in several OECD member countries

    International Nuclear Information System (INIS)

    Reyners, P.

    1977-01-01

    The present paper contains a brief description of the main features of the above-mentioned six countries' licensing systems, namely the legal regime applicable, the appropriate licensing bodies, the general frame and scope of the respective national regimes, the involvement of the public and technical safety bodies as well as the inspection procedures. This description is supplemented by some introductory remarks. (orig.) [de

  2. Main features of licensing requirements for nuclear installations in several OECD member countries

    International Nuclear Information System (INIS)

    Reyners, P.

    1975-01-01

    The present paper contains a brief description of the main features of the above-mentioned six countries' licensing systems, namely the legal regime applicable, the appropriate licensing bodies, the general frame and scope of the respective national regimes, the involvement of the public and technical safety bodies as well as the inspection procedures. This description is supplemented by some introductory remarks. (orig.) [de

  3. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  4. [Radiation protection in medical research : Licensing requirement for the use of radiation and advice for the application procedure].

    Science.gov (United States)

    Minkov, V; Klammer, H; Brix, G

    2017-07-01

    In Germany, persons who are to be exposed to radiation for medical research purposes are protected by a licensing requirement. However, there are considerable uncertainties on the part of the applicants as to whether licensing by the competent Federal Office for Radiation Protection is necessary, and regarding the choice of application procedure. The article provides explanatory notes and practical assistance for applicants and an outlook on the forthcoming new regulations concerning the law on radiation protection of persons in the field of medical research. Questions and typical mistakes in the application process were identified and evaluated. The qualified physicians involved in a study are responsible for deciding whether a license is required for the intended application of radiation. The decision can be guided by answering the key question whether the study participants would undergo the same exposures regarding type and extent if they had not taken part in the study. When physicians are still unsure about their decision, they can seek the advisory service provided by the professional medical societies. Certain groups of people are particularly protected through the prohibition or restriction of radiation exposure. A simplified licensing procedure is used for a proportion of diagnostic procedures involving radiation when all related requirements are met; otherwise, the regular licensing procedure should be used. The new radiation protection law, which will enter into force on the 31st of december 2018, provides a notification procedure in addition to deadlines for both the notification and the licensing procedures. In the article, the authors consider how eligible studies involving applications of radiation that are legally not admissible at present may be feasible in the future, while still ensuring a high protection level for study participants.

  5. 47 CFR 25.137 - Application requirements for earth stations operating with non-U.S. licensed space stations.

    Science.gov (United States)

    2010-10-01

    ... space stations. (a) Earth station applicants or entities filing a “letter of intent” or “Petition for... Union. (d) Earth station applicants requesting authority to operate with a non-U.S.-licensed space... 47 Telecommunication 2 2010-10-01 2010-10-01 false Application requirements for earth stations...

  6. 47 CFR 25.262 - Licensing and domestic coordination requirements for 17/24 GHz BSS space stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing and domestic coordination requirements for 17/24 GHz BSS space stations. 25.262 Section 25.262 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.262...

  7. 10 CFR 32.22 - Self-luminous products containing tritium, krypton-85 or promethium-147: Requirements for license...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Self-luminous products containing tritium, krypton-85 or... containing tritium, krypton-85 or promethium-147: Requirements for license to manufacture, process, produce... self-luminous products containing tritium, krypton-85, or promethium-147, or to initially transfer such...

  8. The Atomic Energy Control Board requirements for the radioisotope licensing of a radiopharmaceutical facility

    International Nuclear Information System (INIS)

    Kennedy, P.

    1980-01-01

    Items that must be addressed by an applicant for a radioisotope license in Canada are described. Site, design and operating conditions, safety assessment, organization, emergency procedures and operating policies and procedures must be described to the Atomic Energy Control Board (AECB), in support of any license application. All information submitted in support of the application is subject to AECB's policy on public access to that information. (OT)

  9. Stakes and Solutions for current and up-coming Licensing Challenges in PWR and BWR Reload and Safety Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Curca-Tiving, F.; Opel, S.

    2014-07-01

    Regulatory requirements for reloads and safety analyses are evolving: New safety criteria, requests for enlarged qualification databases, statistical applications, uncertainty propagation... In order to address these challenges and access more predictable licensing processes, AREVA implements a consistent code and methodology suite for PWR and BWR core design and safety analysis, based on a first principles modeling with an extremely broad international verification and validation data base. (Author)

  10. Shutdown requirements in licensing of research reactors and consequences for operation

    International Nuclear Information System (INIS)

    Roegler, H.-J.; Stein, J.

    1983-01-01

    Most countries start their nuclear life with the setup of a research reactor. Most countries have at this time no licensing authority established which can act on existing laws, rules and regulations. Thus, most countries have during this starting phase to rely on the regulations fixed by international institutions such as the IAEA (or by national institutions as the former NRC in US, which happens to take place more often from reasons below). This implies a specific responsibility for international regulations since they have to be very clear and unique. Moreover they have to be applicable to all plants they are set forth for and they have to give no unavoidable restrictions on the use of the plant. Additionally some recheck of the rules based on national rules in forth will be of help. The enrichment reduction for research reactors gave frequent cause to look at the existing IAEA-publications for research reactors. They are laid down in the safety series no. 35 edited 1971. I will only discuss here specific parts of these considerations or requirements. Since the authors' personal impressions are that the published considerations are neither that clear nor that less restrictive as necessary the subsequent discussion is carried out. One of the confusing points of the existing IAEA-regulations is the lengthy discussion of reactivity considerations for critical assemblies first, no similar separate discussion for research reactors and a second discussion titled 'control-rod considerations' under the main title 'considerations applying to critical assemblies and research reactor'. This discussion will be restricted to the latter since the critical assemblies with their timely Constance of maximum excess reactivity do not present any problem for all shut-down conditions

  11. 21 CFR 1271.150 - Current good tissue practice requirements.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Current good tissue practice requirements. 1271... HUMAN CELLS, TISSUES, AND CELLULAR AND TISSUE-BASED PRODUCTS Current Good Tissue Practice § 1271.150 Current good tissue practice requirements. (a) General. This subpart D and subpart C of this part set...

  12. 10 CFR 40.34 - Special requirements for issuance of specific licenses.

    Science.gov (United States)

    2010-01-01

    ... license to manufacture industrial products and devices containing depleted uranium, or to initially....32; (2) The applicant submits sufficient information relating to the design, manufacture, prototype... industrial product or device to provide reasonable assurance that possession, use, or transfer of the...

  13. 6 CFR 37.17 - Requirements for the surface of the driver's license or identification card.

    Science.gov (United States)

    2010-01-01

    ... Driver's license or identification card number. This cannot be the individual's SSN, and must be unique... University Street, Montreal, Quebec, Canada H3C 5H7, e-mail: [email protected] You may inspect a copy of the...

  14. International vision requirements for driver licensing and disability pensions: using a milestone approach in characterization of progressive eye disease

    Directory of Open Access Journals (Sweden)

    Alain M Bron

    2010-11-01

    Full Text Available Alain M Bron1, Ananth C Viswanathan2, Ulrich Thelen3, Renato de Natale4, Antonio Ferreras5, Jens Gundgaard6, Gail Schwartz7, Patricia Buchholz81Department of Ophthalmology, University Hospital, Dijon, France; 2Glaucoma Research Unit, Moorfields Eye Hospital NHS Foundation Trust and Department of Genetics, University College of London Institute of Ophthalmology, London, UK; 3Private Practice, Munster, Germany; 4Ospedale Civile di Monselice, Monselice, Italy; 5Ophthalmology, Miguel Servet University Hospital, Zaragoza, Spain; 6COWI, Kolding, Denmark; 7Wilmer Eye Institute, Johns Hopkins University, Glaucoma Consultants, Baltimore, MD, USA; 8Patricia Buchholz Consulting, Karlsruhe, GermanyObjective: Low vision that causes forfeiture of driver’s licenses and collection of disability pension benefits can lead to negative psychosocial and economic consequences. The purpose of this study was to review the requirements for holding a driver’s license and rules for obtaining a disability pension due to low vision. Results highlight the possibility of using a milestone approach to describe progressive eye disease.Methods: Government and research reports, websites, and journal articles were evaluated to review rules and requirements in Germany, Spain, Italy, France, the UK, and the US.Results: Visual acuity limits are present in all driver’s license regulations. In most countries, the visual acuity limit is 0.5. Visual field limits are included in some driver’s license regulations. In Europe, binocular visual field requirements typically follow the European Union standard of ≥120°. In the US, the visual field requirements are typically between 110° and 140°. Some countries distinguish between being partially sighted and blind in the definition of legal blindness, and in others there is only one limit.Conclusions: Loss of driving privileges could be used as a milestone to monitor progressive eye disease. Forfeiture could be standardized as a

  15. Consideration of the legal system required for achievement of current nuclear power plant construction programmes

    International Nuclear Information System (INIS)

    Castellon Fernandez, E.; Forum Atomico Espanol, Madrid)

    1976-01-01

    The extensive nuclear power plant construction programmes currently in progress in western countries require updating of the legislation in force in this field, especially as regards the following: acquisition of the sites necessary by means of a national planning programme of available sites; simplification of formalities concerning issuance of administrative licenses; revision of the principle of absolute and exclusive liability of the nuclear operator which forms the basis of the third party liability system for nuclear damage; radioactive waste management and decommissioning of nuclear plants. Furthermore, this new legislation should be harmonized between the different countries concerned. (N.E.A.) [fr

  16. Licensing requirements regarding the qualification of operating personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1981-01-01

    The legal requirements regarding the qualifications of operating personnel in nuclear power plants in the Federal Republic of Germany are outlined as in article 7 of the Atomic Energy Act. For the responsible operating personnel the requisite competence and reliability are legally required; for subordinate personnel the law requires only the necessary knowledge. The requisite competence and the necessary knowledge have been further specified in a set of guidelines by the authorities; work on specification of reliability requirements is under way. Essential elements of the requisite competence of responsible operating personnel are their professional qualification, their safety-related knowledge, their abilities, their practical experience, and - for the responsible shift personnel - their nuclear, plant-related training as well as a written and oral examination. Requalification is indispensible for keeping the requisite competence on a level in accordance with the current state of science and technology. Facts concerning the personal reliability of the responsible operating personnel are assessed by the competent authorities on the basis of information available at other state institutions. For the responsible shift personnel, physical and psychological fitness are important factors contributing to their reliability. The necessary knowledge subordinate operating personnel must possess with respect to plant safety and safety of the personnel is assured via instruction on safety and via special briefings at the working place. Lack of safety-related knowledge has to be compensated for by assigning an experienced permanent supervisor for each activity in question. Current work on qualification of operating personnel concentrates on training, including simulator training, of responsible shift personnel. (author)

  17. Compliance of the Vaalputs national radioactive waste disposal facility to a frequency-magnitude release criterion as required for licensing

    International Nuclear Information System (INIS)

    Adrian, H.W.W.; Gerber, H.H.; Kruger, J.; Weygand, J.

    1986-01-01

    Accidental releases of radioactivity from the Vaalputs nuclear waste repository have been quantified and release frequencies have been attached to a number of accident scenarios of human or natural origin. These have then been compared to a frequency-magnitude release criterion according to South African licensing requirements. It was shown that the criterion was applicable in three release bands. In two of these the criterion was met by some orders of magnitude. In the third band the permitted release frequency was a factor 55 below the limit in spite of pessimistic release assumptions

  18. Guidelines to implement the license renewal technical requirements of 10CFR54 for integrated plant assessments and time-limited aging analyses. Final report

    International Nuclear Information System (INIS)

    Lehnert, G.; Philpot, L.

    1995-11-01

    This report documents the initial results of the Nuclear Energy Institute License Renewal Implementation Guideline Task Force over the period August 1994 to July 1995 to develop guidance for complying with technical requirements of 10CFR54. The report also provided a starting point for the development of NEI 95-10, ''Industry Guideline for Implementing the Requirements of 10CCR54-The License Renewal Rule''. Information in this document can be used by utilities to prepare the technical material needed in an application for license renewal (LR) of a nuclear power unit. This guideline provides methods for identifying systems, structures, and components (SSCs) and their intended functions within the scope of license renewal. It identifies structures and components (SCs) requiring aging management review and methods for performing the aging management review. The guideline provides a process for identifying and evaluating time-limited aging analyses

  19. Risk Assessment for Current and Projected Uses of Source Material Under a U.S. NRC General License and Exemption Request

    International Nuclear Information System (INIS)

    Smith, Michael A.; Napier, Bruce A.; Strom, Daniel J.; Short, Steven M.; Beatty, Cassandra V.; Stoker, Natasha F.; Newman, Teridee

    2006-01-01

    Source material is used under specific license, general license, and various exemptions from licensing requirements in 10 CFR Part 40. Because the Atomic Energy Act of 1946 focused on source material primarily in terms of its significance to the production of special nuclear material, the initial regulation of source material did not, apparently, give much emphasis to public health and safety. This emphasis on the production of special nuclear material continued in later modifications to the regulations. Because the last major update of these regulations was over 40 years ago (1961), the NRC is concerned that the current regulations for source materials may not be consistent with current health and safety regulations. Current industrial trends indicate a general decline in the use of thorium and uranium. Thorium was traditionally used in ceramics for refractory purposes but now is primarily used in scientific research, in a few electrical applications, as a chemical catalyst, and in optical lenses. Uranium, once popular in pigments and glazes, is now almost entirely limited to military applications that require special licensure and in scientific research. Due to high-disposal costs, increasingly stringent regulations, and public concerns related to the natural radioactivity of source material, industry is rapidly developing substitutes and alternate processes that do not involve the use of uranium and thorium. For these reasons, the downward trend in the use of source material is expected to continue. Researchers at Pacific Northwest National Laboratory (PNNL) identified how source materials meeting the exemption and general license requirements of 10 CFR 40.13(a), 40.13(b), and 40.22 are currently being used in industry and by the public. Based on the results of an extensive literature and internet search, few ?truly? new uses of source material were discovered that were not already considered in or represented by previous NRC analyses. Exceptions were (1) the

  20. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  1. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  2. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2015-09-01

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  3. Estimating the seismotelluric current required for observable electromagnetic ground signals

    Directory of Open Access Journals (Sweden)

    J. Bortnik

    2010-08-01

    Full Text Available We use a relatively simple model of an underground current source co-located with the earthquake hypocenter to estimate the magnitude of the seismotelluric current required to produce observable ground signatures. The Alum Rock earthquake of 31 October 2007, is used as an archetype of a typical California earthquake, and the effects of varying the ground conductivity and length of the current element are examined. Results show that for an observed 30 nT pulse at 1 Hz, the expected seismotelluric current magnitudes fall in the range ~10–100 kA. By setting the detectability threshold to 1 pT, we show that even when large values of ground conductivity are assumed, magnetic signals are readily detectable within a range of 30 km from the epicenter. When typical values of ground conductivity are assumed, the minimum current required to produce an observable signal within a 30 km range was found to be ~1 kA, which is a surprisingly low value. Furthermore, we show that deep nulls in the signal power develop in the non-cardinal directions relative to the orientation of the source current, indicating that a magnetometer station located in those regions may not observe a signal even though it is well within the detectable range. This result underscores the importance of using a network of magnetometers when searching for preseismic electromagnetic signals.

  4. Current and Future Research Directions in Requirements Engineering

    Science.gov (United States)

    Cheng, Betty H. C.; Atlee, Joanne M.

    In this paper, we review current requirements engineering (RE) research and identify future research directions suggested by emerging software needs. First, we overview the state of the art in RE research. The research is considered with respect to technologies developed to address specific requirements tasks, such as elicitation, modeling, and analysis. Such a review enables us to identify mature areas of research, as well as areas that warrant further investigation. Next, we review several strategies for performing and extending RE research results, to help delineate the scope of future research directions. Finally, we highlight what we consider to be the “hot” current and future research topics, which aim to address RE needs for emerging systems of the future.

  5. 10 CFR 73.50 - Requirements for physical protection of licensed activities.

    Science.gov (United States)

    2010-01-01

    ... the Federal Register. A copy of the material is available for inspection at the NRC Library, 11545... vital area shall be alarmed. (e) Communication requirements. (1) Each guard or watchman on duty shall be capable of maintaining continuous communication with an individual in a continuously manned central alarm...

  6. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  7. Current USAEC seismic requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Mehta, D.S.

    1975-01-01

    The principal seismic and geologic considerations which guide the USAEC in its evaluation of the suitability of proposed sites for nuclear power plants and plant design bases are set forth as design criteria in the AEC regulatory guides. The basic requirements of seismic design and analysis for seismic Category I structures, components, and systems important to public safety have been established in the USAEC regulatory guides and Code of Federal Regulations. It is pointed out that the current state-of-art techniques, best available technology, and additional studies in the field of earthquake engineering can be utilized to resolve seismic concerns. The seismic design requirements for nuclear plants to withstand postulated earthquakes can be standardized and this will be a significant milestone in the continuation of the Nuclear Standardization Program. (author)

  8. Materials technology for fusion - Current status and future requirements

    International Nuclear Information System (INIS)

    Gold, R.E.; Bloom, E.E.; Clinard, F.W. Jr.; Smith, D.L.; Stevenson, R.D.; Wolfer, W.G.

    1981-01-01

    The general status of the materials research and development activities currently under way in support of controlled thermonuclear fusion reactors in the United States is reviewed. In the area of magnetic confinement configurations, attention is given to development programs for first wall materials, which are at various stages for possible austenitic stainless steels, high-strength Fe-Ni-Cr alloys, reactive and refractory metal alloys, specially designed long-range ordered and rapidly solidified alloys, and ferritic/martensitic steels, and for tritium breeding materials, electrical insulators, ceramics, and coolants. The development of materials for inertial confinement reactors is also surveyed in relation to the protection scheme employed for the first wall and the effects of pulsed neutron irradiation. Finally, the materials requirements and selection procedures for the ETF/INTOR and Starfire tokamak reactor designs are examined. Needs for the expansion of research on nonfirst-wall materials and inertial confinement fusion reactor material requirements are pointed out

  9. Status of safety issues at licensed power plants: TMI action plan requirements, unresolved safety issues, generic safety issues

    International Nuclear Information System (INIS)

    1991-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program was established whereby an annual NUREG report would be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was compiled and reported in three NUREG volumes. Volume 1, published in March 1991, addressed the status of of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). This annual NUREG report combines these volumes into a single report and provides updated information as of September 30, 1991. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. This report is to provide a comprehensive description of the implementation and verification status of TMI Action Plan Requirements, safety issues designated as USIs, and GSIs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  10. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  11. Deposition and interception of radionuclides. Current knowledge and future requirements

    International Nuclear Information System (INIS)

    1998-12-01

    Following an accidental or routine release of radionuclides into the environment, a good knowledge of deposition processes is necessary in order to accurately predict the radiation dose to members of the public. In order to understand the environmental impact of released radionuclides and their transfer through the environment, including the food chain to man, there have been numerous studies on deposition of radionuclides to a range of surfaces such as bare soil, crops, forests, water bodies and urban surfaces. The RADREM committee provides a forum for liaison on UK research and monitoring in the areas of radioactive substances and radioactive waste management. RADREM has set up four sub-committees to cover issues related to radioactivity in the atmospheric, terrestrial and aquatic environments as well as those related radioactive waste management. One of the sub-committee tasks is to organise seminars and workshops on specific topics of interest. The first of these was the workshop on 'Deposition and Interception of Radionuclides: Current knowledge and future requirements' organised last year by the Ministry of Agriculture, Fisheries and Food (MAFF), acting as secretariat for the Terrestrial Environment Sub-Committee (TESC) of RADREM. The intent of this workshop was to provide an opportunity to exchange information on deposition-related aspects between representatives from various interested parties including government, regulatory bodies, industry and research organisations. Through presentations and discussions, this workshop addressed current developments in the areas of deposition and interception of radionuclides by various surfaces and served to identify areas which need further research. Papers were presented on various aspects of deposition and interception of radionuclides including deposition into grass, fruits and other crops as well as deposition into urban areas and forests

  12. 75 FR 32983 - Commercial Driver's License (CDL) Standards: Exemption

    Science.gov (United States)

    2010-06-10

    ...-28480] Commercial Driver's License (CDL) Standards: Exemption AGENCY: Federal Motor Carrier Safety... commercial driver's license (CDL) as required by current regulations. FMCSA reviewed NAAA's application for... demonstrate alternatives its members would employ to ensure that their commercial motor vehicle (CMV) drivers...

  13. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  14. 18 CFR 16.10 - Information to be provided by an applicant for new license: Filing requirements.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Applications for... redistribution of power flows on line loading (with respect to applicable thermal, voltage, or stability limits... governmental agencies and subdivisions likely to be interested in or affected by the proposed expansion. (11...

  15. Review of the first partial licence for the Muelheim-Kaerlich reactor on the basis of the licensing requirements under nuclear law

    International Nuclear Information System (INIS)

    Hahn, L.; Wimmer, J.

    1990-11-01

    The expert opinion is restricted in the main to the licensing requirements in connection with the latest state-of-the-art precautionary measures against damage, i.e. subsection 3 of paragraph 7 section 2 Atomic Energy Act. Subject of the evaluations regarding the required new scope of licensing were the cancelled first partial licence, subsequent partial licences, the TUEV (Technical Control Board) expert opinion, the safety report with its continuations as well as the judgments of the Higher Administrative Court in Koblenz and the Federal Administrative Court. For determining the state-of-the-art, the expert opinion refers to the valid body of regulations, the latest concepts for PWRs in particular in the Federal Republic of Germany, and more recent results in reactor safety research. (orig./DG) [de

  16. Helicopter Fatigue. A Review of Current Requirements and Substantiation Procedures

    Science.gov (United States)

    1979-01-01

    stress versus cycles to failure (S/N) method of testing and verification. A mi..iimum of six test specimens is required to establish the mean curve with...Approach) A.D. Hall B.Sc., C.Eng., M.R.Ae.S. 4 Chief Stress Engineer (Dynamic Components) Westland Helicopters Limited, Yeovil, Somerset, England...airworthiness requirements concerning the fatifue strength of British milltary nelicopters are embodied in the U.K. Ministry Documents Aviation Publication

  17. Calculating Electrical Requirements for Direct Current Electric Actuators

    Science.gov (United States)

    2017-11-29

    equation 1. The moment of inertia must be a composite value of all rotating masses including the load, actuator components, and the motor rotor . Both...to the torque required to accelerate, there is a load torque, TL. The load torque is a composite value representing the torque required to overcome...values can typically be incorporated into a conservative composite efficiency value that provides reasonably accurate results. Since this report

  18. Allegheny County Dog Licenses

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — A list of dog license dates, dog breeds, and dog name by zip code. Currently this dataset does not include City of Pittsburgh dogs.

  19. The current regulatory requirements on optimisation and BAT in Sweden in the context of geological disposal

    International Nuclear Information System (INIS)

    Dverstorp, B.

    2010-01-01

    Bjorn Dverstorp, Swedish Radiation Safety authority (SSM) presented 'The current regulatory requirements on optimisation and BAT in Sweden in the context of geological disposal'. In Sweden, a nuclear waste repository will be evaluated according to both to general environmental legislation (the Environmental Code, SFS, 1998:808) and according to more specific requirements in the Act on Nuclear Activities (SFS, 1984:3) and the Radiation Protection Act (SFS, 1988:220). The evaluations according to these laws will be carried out according to two separate, but coordinated, legal-review and decision-making processes. This will be a basis for the siting process. Although the requirements on BAT and siting in the Environmental Code apply to radiological protection, they aim at a broader system optimisation. The more specific requirements on optimisation and BAT of radiological protection of geological disposal systems are given in the regulations associated with the Radiation Protection Act. The Swedish radiation protection regulations (SSM, 2009) comprise three corner stones: a risk target, environmental protection goals and the use of optimisation and BAT. In SSM' s guidance optimisation is defined as a means to reduce risk, guided by the results of risk calculations. In case of a conflict between BAT and optimisation, measures satisfying BAT should have priority. Application of optimisation and BAT on different timescales are described as well as for human intrusion scenarios. B. Dverstorp explained that because of uncertainties in the long term there is a need for additional arguments in the safety case in support of decision making. It is in this context that the requirements on optimisation and BAT should be seen as supplementary to the risk target, in providing evidence that the developer has taken into consideration, as far as reasonably possible, measures and options for reducing future doses and risks. Both principles focus on the proponent's work on developing

  20. Site Specific Vendor's License

    Data.gov (United States)

    Montgomery County of Maryland — This dataset contains information of a site-specific vendor's license which is required if an individual sells or offers to sell goods or services from a stationary...

  1. Fueling Requirements for Steady State high butane current fraction discharges

    International Nuclear Information System (INIS)

    R.Raman

    2003-01-01

    The CT injector originally used for injecting CTs into 1T toroidal field discharges in the TdeV tokamak was shipped PPPL from the Affiliated Customs Brokers storage facility in Montreal during November 2002. All components were transported safely, without damage, and are currently in storage at PPPL, waiting for further funding in order to begin advanced fueling experiments on NSTX. The components are currently insured through the University of Washington. Several technical presentations were made to investigate the feasibility of the CT injector installation on NSTX. These technical presentations, attached to this document, were: (1) Motivation for Compact Toroida Injection in NSTX; (2) Assessment of the Engineering Feasibility of Installing CTF-II on NSTX; (3) Assessment of the Cost for CT Installation on NSTX--A Peer Review; and (4) CT Fueling for NSTX FY 04-08 steady-state operation needs

  2. Performance demonstration requirements for eddy current steam generator tube inspection

    International Nuclear Information System (INIS)

    Kurtz, R.J.; Heasler, P.G.; Anderson, C.M.

    1992-10-01

    This paper describes the methodology used for developing performance demonstration tests for steam generator tube eddy current (ET) inspection systems. The methodology is based on statistical design principles. Implementation of a performance demonstration test based on these design principles will help to ensure that field inspection systems have a high probability of detecting and correctly sizing tube degradation. The technical basis for the ET system performance thresholds is presented. Probability of detection and flaw sizing tests are described

  3. Geosensors to Support Crop Production: Current Applications and User Requirements

    Directory of Open Access Journals (Sweden)

    Lammert Kooistra

    2011-06-01

    Full Text Available Sensor technology, which benefits from high temporal measuring resolution, real-time data transfer and high spatial resolution of sensor data that shows in-field variations, has the potential to provide added value for crop production. The present paper explores how sensors and sensor networks have been utilised in the crop production process and what their added-value and the main bottlenecks are from the perspective of users. The focus is on sensor based applications and on requirements that users pose for them. Literature and two use cases were reviewed and applications were classified according to the crop production process: sensing of growth conditions, fertilising, irrigation, plant protection, harvesting and fleet control. The potential of sensor technology was widely acknowledged along the crop production chain. Users of the sensors require easy-to-use and reliable applications that are actionable in crop production at reasonable costs. The challenges are to develop sensor technology, data interoperability and management tools as well as data and measurement services in a way that requirements can be met, and potential benefits and added value can be realized in the farms in terms of higher yields, improved quality of yields, decreased input costs and production risks, and less work time and load.

  4. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  5. 78 FR 4307 - Current Good Manufacturing Practice Requirements for Combination Products

    Science.gov (United States)

    2013-01-22

    ...-2009-N-0435] Current Good Manufacturing Practice Requirements for Combination Products AGENCY: Food and...) is issuing this regulation on the current good manufacturing practice (CGMP) requirements applicable... this subpart? (Sec. 4.2) D. What current good manufacturing practice requirements apply to my...

  6. Dealing with the current permissibility application for constructing a spent fuel DGR in Sweden. SKB's license applications for a spent fuel repository

    International Nuclear Information System (INIS)

    Olsson, Olle

    2014-01-01

    The nuclear power utilities in Sweden were in 1976 obliged to demonstrate a safe method for final disposal of spent fuel in order to start operation of new reactors. This initiated a comprehensive research, development and demonstration programme and the development of the KBS-method for final disposal. A new Nuclear Activities Act in 1984 gave the reactor owners full technical and financial responsibility for the waste. They gave in turn SKB the responsibility for all nuclear waste management. Reprocessing was no longer required and direct disposal of the spent fuel has, since then, been the main alternative. Alternative methods for final disposal have been evaluated and compared to the KBS-3-method but it has remained the preferred alternative. A comprehensive research, development and demonstration programme to strengthen the scientific basis and to refine the KBS-3-method has been operated by SKB since then. The site selection process for the final repository for spent nuclear fuel was initiated in 1992. The work included general siting studies at the national and the municipal level and in 2002, SKB initiated site investigations for siting of a final repository on two sites: the Simpevarp and Laxemar areas and the Forsmark area. At the same time, the work on preparing license applications to construct and operate an encapsulation plant and a final repository for spent fuel was started. In June 2009, SKB announced Forsmark as the selected site for the final repository. This paper reviews the applicable legislation and describes the license application, the licensing review and the preparations for implementation

  7. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  8. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  9. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  10. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  11. Final environmental statement concerning rule making. Exemption from licensing requirements for spark-gap irradiators that contain cobalt-60. Docket No. PRM 30-54

    International Nuclear Information System (INIS)

    1977-12-01

    The potential environmental impacts and adverse environmental effects from distribution, use only in commercial-sized oil burners, and disposal of 6000 spark-gap irradiators per year that contain 60 Co are summarized. On the basis of the analysis and evaluation set forth in this statement and after weighing the environmental, economic, technical, and other benefits against environmental costs and after considering available alternatives, it is concluded that the action called for under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 is the issuance of an exemption from licensing requirements for spark-gap irradiators that contain 60 Co, subject to the following conditions for the protection of the environment: persons who apply 60 Co to, or persons who incorporate 60 Co into, spark-gap irradiators or persons who import for sale or distribution spark-gap irradiators containing 60 Co are not exempt from the requirements for a license; each spark-gap irradiator shall contain no more than 1 μCi of 60 Co; and the 60 Co shall be applied to the spark-gap irradiators for use in electrically ignited fuel-oil burners having a firing rate of at least 3 gal/h

  12. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  13. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues

    International Nuclear Information System (INIS)

    1992-12-01

    This report is to provide a comprehensive description of the implementation and verification status of Three Mile Island (TMI) Action Plan requirements, safety issues designated as Unresolved Safety Issues (USIs), Generic Safety Issues(GSIs), and other Multiplant Actions (MPAs) that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. An additional purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  14. IRIS Licensing Status

    International Nuclear Information System (INIS)

    Kling, Charles L.; Carelli, Mario D.

    2006-01-01

    The International Reactor Innovative and Secure (IRIS) nuclear power plant is well into the pre-application review process with the US NRC and has accomplished its first near term goal of obtaining US NRC feedback on the long term testing program. To date, the IRIS team has submitted to the US NRC a number of documents patterned after the Evaluation Model Development and Assessment Process (EMDAP) outlined in Regulatory Guide 1,203. They have covered a detailed description of IRIS, initial safety analysis results, PIRT development for limiting transients, scaling analysis and a description of the test program. The IRIS Safety-by-Desing TM intrinsically eliminates and/or significantly reduces the consequences of traditional LWR accidents. In addition, the fewer passive safety systems are similar in principle to those of the US NRC approved AP1000 design. For these reasons, the IRIS testing program only needs to include those features unique to the IRIS design. NRC feedback was that the planned test program appeared to be complete and could generate sufficient information to support a Design Certification (DC) submittal. The US NRC has also stated that a DC application must include complete information regarding the test program. On this basis the IRIS team has initiated an aggressive program to conduct IRIS testing to support a DC submittal by the end of 2008. Subsequent US NRC review should be expeditious because of the AP1000 precedent, allowing IRIS to obtain its Final Design Approval (FDA) in 2012; thereby, maintaining its goal of deployment in the 2015-2017 time frame. The next steps in the pre-application review process will be to provide the US NRC with a road map of the anticipated IRIS licensing process, a review of current licensing requirements showing that IRIS meets or exceeds all current criteria and information to support the long term goal of redefining the Emergency Planning Zone (EPZ)

  15. 46 CFR 11.713 - Requirements for maintaining current knowledge of waters to be navigated.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Requirements for maintaining current knowledge of waters to be navigated. 11.713 Section 11.713 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN REQUIREMENTS FOR OFFICER ENDORSEMENTS Professional Requirements for Pilots § 11.713 Requirements for maintaining curren...

  16. Algeria schedules onshore licensing round

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Algeria's Sonatrach will conduct its first international onshore exploration licensing round in a move designed to triple drilling activity in the country. A second round will follow next April. Sonatrach plans to drill 200 wells during 1991-95, which will require the current level of 37/year to be almost trebled toward the end of the period. To this end foreign operators are being courted in an open exploration bidding round. Deadline for bid submittal in Nov. 30. Companies may enter singly or in groups to form partnerships with Sonatrach. Foreign licensees will be able to take a maximum 49% of production under Algerian law

  17. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  18. Final Environmental Impact Statement on 10 CFR Part 61 licensing requirements for land disposal of radioactive waste

    International Nuclear Information System (INIS)

    1982-11-01

    The three-volume final environmental impact statement (FEIS) is prepared to guide and support publication of a final regulation, 10 CFR Part 61, for the land disposal of low-level radioactive waste. The FEIS is prepared in response to public comments received on the draft environmental impact statement (DEIS) on the proposed Part 61 regulation. The DEIS was published in September 1981 as NUREG-0782. Public comments received on the proposed Part 61 regulation separate from the DEIS are also considered in the FEIS. The FEIS is not a rewritten version of the DEIS, which contains an exhaustive and detailed analysis of alternatives, but rather references the DEIS and presents the final decision bases and conclusions (costs and impacts) which are reflected in the Part 61 requirements. Four cases are specifically considered in the FEIS representing the following: past disposal practice, existing disposal practice, Part 61 requirements, and an upper bound example. The Summary and Main Report are contained in Volume 1. Volume 2 consists of Appendices A - Staff Analysis of Public Comments on the DEIS for 10 CFR Part 61, and Appendices B - Staff Analysis of Public Comments on Proposed 10 CFR Part 61 Rulemaking. Volume 3 contains Appendices C-F, entitled as follows: Appendix C - Revisions to Impact Analysis Methodology, Appendix D - Computer Codes Used for FEIS Calculations, Appendix E - Errata for the DEIS for 10 CFR Part 61 and last, Appendix F - Final Rule and Supplementary Information

  19. Scallop License Limitation Program (SLLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A federal Scallop License Limitation Program (SLLP) license is required onboard any vessel deployed in scallop fisheries in Federal waters off Alaska (except for...

  20. Teacher License Reciprocity. 50-State Review

    Science.gov (United States)

    Aragon, Stephanie

    2017-01-01

    This policy report defines and provides a 50-state review of teacher license reciprocity, explores how state-specific licensing requirements impact the teacher labor market, and includes examples of national and state efforts to facilitate reciprocity.

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  4. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  5. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  9. Licensing of the proposed PBMR-SA

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Henderson, N.R.; Hill, T.F.; Keenan, N.H.; Metcalf, P.E.; Mysenkov, A.

    1997-01-01

    This paper describes the preliminary criteria, which are intended to be used by the South African regulatory authority (CNS), for licensing of the ESKOM proposed - South African high temperature gas-cooled Pebble Bed Modular Reactor (PBMR-SA). The CNS intends to apply the existing CNS licensing approach together with some international design criteria used for advanced reactors as well as international experience gained from the safety evaluation of the MHTGR, THTR, etc. A major requirement to this type of reactor is that it should comply with the current CNS risk criteria and provide, as a minimum, the same degree of protection to the operator, public and environment that is required for the current generation of nuclear reactors. (author)

  10. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues

    International Nuclear Information System (INIS)

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  11. Status of safety issues at licensed power plants: TMI Action Plan requirements, unresolved safety issues, generic safety issues, other multiplant action issues. Supplement 4

    International Nuclear Information System (INIS)

    1994-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. Supplement 3 gives status as of September 30, 1993. This annual report, Supplement 4, presents updated information as of September 30, 1994. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees

  12. Safety of currently licensed hepatitis B surface antigen vaccines in the United States, Vaccine Adverse Event Reporting System (VAERS), 2005-2015.

    Science.gov (United States)

    Haber, Penina; Moro, Pedro L; Ng, Carmen; Lewis, Paige W; Hibbs, Beth; Schillie, Sarah F; Nelson, Noele P; Li, Rongxia; Stewart, Brock; Cano, Maria V

    2018-01-25

    Currently four recombinant hepatitis B (HepB) vaccines are in use in the United States. HepB vaccines are recommended for infants, children and adults. We assessed adverse events (AEs) following HepB vaccines reported to the Vaccine Adverse Event Reporting System (VAERS), a national spontaneous reporting system. We searched VAERS for reports of AEs following single antigen HepB vaccine and HepB-containing vaccines (either given alone or with other vaccines), from January 2005 - December 2015. We conducted descriptive analyses and performed empirical Bayesian data mining to assess disproportionate reporting. We reviewed serious reports including reports of special interest. VAERS received 20,231 reports following HepB or HepB-containing vaccines: 10,291 (51%) in persons 18 years; for 1485 (7.3%) age was missing. Dizziness and nausea (8.4% each) were the most frequently reported AEs following a single antigen HepB vaccine: fever (23%) and injection site erythema (11%) were most frequent following Hep-containing vaccines. Of the 4444 (22%) reports after single antigen HepB vaccine, 303 (6.8%) were serious, including 45 deaths. Most commonly reported cause of death was Sudden Infant Death Syndrome (197). Most common non-death serious reports following single antigen HepB vaccines among infants aged children aged 1-23 months; infections and infestation (8) among persons age 2-18 years blood and lymphatic systemic disorders; and general disorders and administration site conditions among persons age >18 years. Most common vaccination error following single antigen HepB was incorrect product storage. Review current U.S.-licensed HepB vaccines administered alone or in combination with other vaccines did not reveal new or unexpected safety concerns. Vaccination errors were identified which indicate the need for training and education of providers on HepB vaccine indications and recommendations. Published by Elsevier Ltd.

  13. Comparison between numerical and analytical results on the required rf current for stabilizing neoclassical tearing modes

    Science.gov (United States)

    Wang, Xiaojing; Yu, Qingquan; Zhang, Xiaodong; Zhang, Yang; Zhu, Sizheng; Wang, Xiaoguang; Wu, Bin

    2018-04-01

    Numerical studies on the stabilization of neoclassical tearing modes (NTMs) by electron cyclotron current drive (ECCD) have been carried out based on reduced MHD equations, focusing on the amount of the required driven current for mode stabilization and the comparison with analytical results. The dependence of the minimum driven current required for NTM stabilization on some parameters, including the bootstrap current density, radial width of the driven current, radial deviation of the driven current from the resonant surface, and the island width when applying ECCD, are studied. By fitting the numerical results, simple expressions for these dependences are obtained. Analysis based on the modified Rutherford equation (MRE) has also been carried out, and the corresponding results have the same trend as numerical ones, while a quantitative difference between them exists. This difference becomes smaller when the applied radio frequency (rf) current is smaller.

  14. Brand management of licensed innovation X

    OpenAIRE

    Hämäläinen, Tommy

    2016-01-01

    European start-up company has patented a packaging innovation concept for a certain the food product. The manufacturing and productization of the innovation will be licensed internationally for several participants. The Case Company is therefore interested to know what kind of opportunities and requirements potentially simultaneous strategic partnerships with licensees would mean for the brand of the innovation in theory and practice. The purpose of this thesis was to evaluate the current...

  15. Licensing of spent fuel storage facility including its physical protection in the Czech Republic

    International Nuclear Information System (INIS)

    Fajman, V.; Sedlacek, J.

    1992-01-01

    The current spent fuel management policies as practised in the Czech Republic are described, and the conception of the fuel cycle back end is outlined. The general principles and the legislative framework are explained of the licensing process concerning spent fuel interim storage facilities, including the environmental impact assessment component. The history is outlined of the licensing process for the spent fuel storage facility at the Dukovany NPP site, including the licensing of the transport and storage cask. The basic requirements placed on the physical safeguarding of the facility and on the licensing process are given. (J.B.). 13 refs

  16. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  17. Software licenses: Stay honest!

    CERN Multimedia

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  18. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  19. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  20. Trends in CANDU licensing

    International Nuclear Information System (INIS)

    Snell, V.G.; Grant, S.D.

    1997-01-01

    Modern utilities view nuclear power more and more as a commodity - it must compete 'today' with current alternatives to attract their investment. With its long construction times and large capital investment, nuclear plants are vulnerable to delays once they have been committed. There are two related issues. Where the purchaser and the regulator are experienced in CANDU, the thrust is a very practical one: to identify and resolve major licensing risks at a very early stage in the project. Thus for a Canadian project, the designer (AECL) and the prospective purchaser would deal directly with the AECB. However CANDU has also been successfully licensed in other countries, including Korea, Romania, Argentina, India and Pakistan. Each of these countries has its own regulatory agency responsible for licensing the plant. In addition, however, the foreign customer and regulator may seek input from the AECB, up to and including a statement of licensability in Canada; this is not normally needed for a ''repeat'' plant and/or if the customer is experienced in CANDU, but can be requested if the plant configuration has been modified significantly from an already-operating CANDU. It is thus the responsibility of the designer to initiate early discussions with the AECB so the foreign CANDU meets the expectations of its customers

  1. Implications of ITER requirements on R and D of RF heating and current drive systems

    International Nuclear Information System (INIS)

    Bosia, G.; Agarici, G.; Beaumont, B.

    2003-01-01

    Heating and Current Drive (H and CD) systems have an essential role in ITER-FEAT operation, as all phases of ITER operation are driven and controlled by the auxiliary power flow. The RF (Electron Cyclotron and Ion Cyclotron) systems, planned to contribute for ∼ 60% of the total auxiliary power (72 MW), with Lower Hybrid used for the specialised function of current drive in the extended performance phase (20 MW), are at different level of technology development. All systems, need a significant development in order to meet ITER operation requirements In this paper these requirements are reviewed and CEA proposals for the development of the Ion cyclotron system presented. (author)

  2. The relationship between chiropractor required and current level of business knowledge.

    Science.gov (United States)

    Ciolfi, Michael Anthony; Kasen, Patsy Anne

    2017-01-01

    Chiropractors frequently practice within health care systems requiring the business acumen of an entrepreneur. However, some chiropractors do not know the relationship between the level of business knowledge required for practice success and their current level of business knowledge. The purpose of this quantitative study was to examine the relationship between chiropractors' perceived level of business knowledge required and their perceived level of current business knowledge. Two hundred and seventy-four participants completed an online survey (Health Care Training and Education Needs Survey) which included eight key business items. Participants rated the level of perceived business knowledge required (Part I) and their current perceived level of knowledge (Part II) for the same eight items. Data was collected from November 27, 2013 to December 18, 2013. Data were analyzed using Spearman's ranked correlation to determine the statistically significant relationships for the perceived level of knowledge required and the perceived current level of knowledge for each of the paired eight items from Parts I and II of the survey. Wilcoxon Signed Ranks Tests were performed to determine the statistical difference between the paired items. The results of Spearman's correlation testing indicated a statistically significant ( p business items (6 of 8) however a statistically difference was demonstrated in only three of the paired business items. The implications of this study for social change include the potential to improve chiropractors' business knowledge and skills, enable practice success, enhance health services delivery and positively influence the profession as a viable career.

  3. The strategy of experimental power reactor licensing in Indonesia

    International Nuclear Information System (INIS)

    Moch Djoko Birmano

    2015-01-01

    Currently, BATAN has being planned to develop Experimental Power Reactor (EPR), that is the research nuclear reactor that can generate power (electricity or heat). The EPR is planned will be built in the National Center for Research of Science and Technology (Puspiptek) area at Serpong, South Tangerang, Banten Province, with the choice of reactor types is HTGR with the power size of 10 MWth. As stated in the Act No. 10 year 1997 on Nuclear Power, that every construction and operation of nuclear reactors and other nuclear installations and decommissioning of nuclear reactors required to have a permit. Furthermore, the its implementation arrangements is regulated in Government Regulation (GR) No. 2 year 2014 on Licensing of Nuclear Installations and Nuclear Material Utilization, which contains the requirements and procedures for the licensing process since site, construction, commissioning, operation, and decommissioning, it means licensing is implemented during the activity of construction, operation and decommissioning of NPPs.While, for the more detailed licensing arrangements available in the guidelines of BAPETEN Chairman Regulation (BCR). This study was conducted to understand the legal and institutional aspects, types and stages, and the licensing process of RDE, and identify licensing strategy so that timely as planned. Methodologies used include the literature study, consultation with experts in BAPETEN, discussions in the national seminar including FGD. (author)

  4. Advanced CANDU reactor pre-licensing progress

    International Nuclear Information System (INIS)

    Popov, N.K.; West, J.; Snell, V.G.; Ion, R.; Archinoff, G.; Xu, C.

    2005-01-01

    The Advanced CANDU Reactor (ACR) is an evolutionary advancement of the current CANDU 6 reactor, aimed at producing electrical power for a capital cost and at a unit-energy cost significantly less than that of the current reactor designs. The Canadian Nuclear Safety Commission (CNSC) staff are currently reviewing the ACR design to determine whether, in their opinion, there are any fundamental barriers that would prevent the licensing of the design in Canada. This CNSC licensability review will not constitute a licence, but is expected to reduce regulatory risk. The CNSC pre-licensing review started in September 2003, and was focused on identifying topics and issues for ACR-700 that will require a more detailed review. CNSC staff reviewed about 120 reports, and issued to AECL 65 packages of questions and comments. Currently CNSC staff is reviewing AECL responses to all packages of comments. AECL has recently refocused the design efforts to the ACR-1000, which is a larger version of the ACR design. During the remainder of the pre-licensing review, the CNSC review will be focused on the ACR-1000. AECL Technologies Inc. (AECLT), a wholly-owned US subsidiary of AECL, is engaged in a pre-application process for the ACR-700 with the US Nuclear Regulatory Commission (USNRC) to identify and resolve major issues prior to entering a formal process to obtain standard design certification. To date, the USNRC has produced a Pre-Application Safety Assessment Report (PASAR), which contains their reviews of key focus topics. During the remainder of the pre-application phase, AECLT will address the issues identified in the PASAR. Pursuant to the bilateral agreement between AECL and the Chinese nuclear regulator, the National Nuclear Safety Administration (NNSA) and its Nuclear Safety Center (NSC), NNSA/NSC are reviewing the ACR in seven focus areas. The review started in September 2004, and will take three years. The main objective of the review is to determine how the ACR complies

  5. EMPIRICAL STUDY OF CAR LICENSE PLATES RECOGNITION

    Directory of Open Access Journals (Sweden)

    Nasa Zata Dina

    2015-01-01

    Full Text Available The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms have been proposed by many researchers. License plate recognition requires license plate detection, segmentation, and charac-ters recognition. The algorithm detects the position of a license plate and extracts the characters. Various license plate recognition algorithms have been implemented, and each algorithm has its strengths and weaknesses. In this research, I implement three algorithms for detecting license plates, three algorithms for segmenting license plates, and two algorithms for recognizing license plate characters. I evaluate each of these algorithms on the same two datasets, one from Greece and one from Thailand. For detecting li-cense plates, the best result is obtained by a Haar cascade algorithm. After the best result of license plate detection is obtained, for the segmentation part a Laplacian based method has the highest accuracy. Last, the license plate recognition experiment shows that a neural network has better accuracy than other algo-rithm. I summarize and analyze the overall performance of each method for comparison.

  6. ACR: Licensing and design readiness

    International Nuclear Information System (INIS)

    Alizadeh, A.

    2009-01-01

    Full text The Canadian nuclear technology has a long history dating back to the 1940s. In this regard, Canada is in a unique situation, shared only by a very few countries, where original nuclear power technology has been invented and further developed. Canadian Nuclear Safety Commission (CNSC), then called AECB, was established in 1946. CNSC focuses on nuclear security, nuclear safety, establishing health and safety regulations, and has also played an instrumental role in the formation of the IAEA. CNSC has provided assistance to the establishment of regulatory authorities in AECL's client countries such as Korea, Argentina, China and Romania. AECL has developed the Gen III+ ACR 1000 as evolutionary advancement of the current CANDU 6 reactor. ACR-1000 has evolved from AECL's in depth experience with CANDU systems, components, and materials, as well as the feedback received from owners and operators of CANDU plants. The ACR-1000 design retains the proven strengths and features of CANDU reactors, while incorporating innovations and state-of-the-art technology. It also features major improvements in economics, inherent safety characteristics, and performance. ACR-1000 has completed its Basic Engineering, has advanced in the licensing process in Canada, and is ready for deployment in Canadian and world markets. EC6 is an evolution of CANDU 6 and is a Gen III natural uranium fuelled reactor. Its medium size and potential for fuel localization and advanced fuel cycles is an optimal strategic solution in many markets.AECL's reactor products are shown to be compliant with a variety of licensing and regulatory requirements. These include the new CNSC DRD-337, IAEA NS-R1, and EUR. This allows the countries interested in CANDU reactor products to be confident of its licensing in their own regulatory regimes.

  7. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  8. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  9. License - Gclust Server | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Gclust Server License License to Use This Database Last updated : 2009/09/14 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  10. Single cell wound generates electric current circuit and cell membrane potential variations that requires calcium influx.

    Science.gov (United States)

    Luxardi, Guillaume; Reid, Brian; Maillard, Pauline; Zhao, Min

    2014-07-24

    Breaching of the cell membrane is one of the earliest and most common causes of cell injury, tissue damage, and disease. If the compromise in cell membrane is not repaired quickly, irreversible cell damage, cell death and defective organ functions will result. It is therefore fundamentally important to efficiently repair damage to the cell membrane. While the molecular aspects of single cell wound healing are starting to be deciphered, its bio-physical counterpart has been poorly investigated. Using Xenopus laevis oocytes as a model for single cell wound healing, we describe the temporal and spatial dynamics of the wound electric current circuitry and the temporal dynamics of cell membrane potential variation. In addition, we show the role of calcium influx in controlling electric current circuitry and cell membrane potential variations. (i) Upon wounding a single cell: an inward electric current appears at the wound center while an outward electric current is observed at its sides, illustrating the wound electric current circuitry; the cell membrane is depolarized; calcium flows into the cell. (ii) During cell membrane re-sealing: the wound center current density is maintained for a few minutes before decreasing; the cell membrane gradually re-polarizes; calcium flow into the cell drops. (iii) In conclusion, calcium influx is required for the formation and maintenance of the wound electric current circuitry, for cell membrane re-polarization and for wound healing.

  11. Reactor licensing process: a status report

    International Nuclear Information System (INIS)

    Long, J.A.

    1977-01-01

    The Nuclear Regulatory Commission (NRC), in its review of applications for licenses to construct and operate nuclear power plants, is required to consider those measures necessary to ensure the protection of the health and safety of the public and the environment. The article discusses the NRC staff procedures and policies for conducting the detailed safety, environmental, and antitrust reviews that provide the basis for these assurances. Included is a discussion of the improvements to the licensing process currently being proposed or implemented to enhance its stability and predictability for the benefit of all involved with the regulation of nuclear power. The views and opinions expressed in the article are those of the author alone and do not represent positions of the NRC

  12. Licensed Healthcare Facilities

    Data.gov (United States)

    California Natural Resource Agency — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  13. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  14. Cost and risk reduction using upfront licensing in Canada. Annex 15

    International Nuclear Information System (INIS)

    Snell, V.G.

    2002-01-01

    The paper summarizes the use of 'up-front' licensing in Canada - how licensing requirements are defined, and met - in advance of a project commitment. The approach to licensing in Canada has allowed flexibility in development of new designs. Since licensing was originally risk-based, and current regulatory policy allows cost-benefit considerations as part of the decision making, risk can be and should be used in novel circumstances as a licensing tool. Since the licensing framework is non-prescriptive, innovative approaches to design can be introduced and dispositioned without changing the legal structure. This flexibility has been used in several up-front licensing reviews: a small urban heating reactor, repeat CANDU 6 generating station units, and the single unit CANDU 9 generating station. In the future we expect to apply it to advanced designs, as an essential part of risk reduction and customer confidence in the product. The important lessons learned in Canada include: Up-front licensing is essential to reduce the risk of licensing-related delays once a project has been committed. It requires a significant investment in time and effort from both the designer and the regulator; The most effective scope for up-front licensing is for the regulator to thoroughly assess novel concepts, test the design against changed domestic requirements, and follow-up on known difficult areas; and for the designer to ensure foreign requirements are incorporated. There is little benefit in certifying the design in detail; Although it would be satisfying to have legally-binding certification, in the end there can be no legal obligation on the regulator, and agreement is pursued on the basis of good faith that the regulator will not make arbitrary decisions and that the designer will meet agreed targets or requirements; In almost all circumstances, issues will arise that are beyond the current 'rules', however expressed. Rather than rushing to create new rules, one reaches a

  15. Investment issues in nuclear plant license renewal

    International Nuclear Information System (INIS)

    Eynon, R.T.

    1999-01-01

    A method that determines the operating lives for existing nuclear power plants is discussed. These assumptions are the basis for projections of electricity supply through 2020 reported in the Energy Information Administration's (EIA's) Annual Energy Outlook 1999. To determine if plants will seek license renewal, one must first determine if they will be operating to the end of their current licenses. This determination is based on an economic test that assumes an investment of $150/kW will be required after 30 yr of operation for plants with older designs. This expenditure is intended to be equivalent to the cost that would be associated with any of several needs such as a one0time investment to replace aging equipment (steam generators), a series of investments to fix age-related degradation, increases in operating costs, or costs associated with decreased performance. This investment is compared with the cost of building and operating the lowest-cost new plant over the same 10-yr period. If a plant fails this test, it is assumed to be retired after 30 yr of service. All other plants are then considered candidates for license renewal. The method used to determine if it is economic to apply for license renewal and operate plants for an additional 20 yr is to assume that plants face an investment of $250 million after 40 yr of operation to refurbish aging components. This investment is compared with the lowest-cost new plant alternative evaluated over the same 20 yr that the nuclear plant would operate. If the nuclear plant is the lowest cost option, it is projected to continue to operate. EIA projects that it would be economic to extend the operating licenses for 3.7 GW of capacity (6 units)

  16. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  17. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  18. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Garea, V.

    2003-01-01

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  19. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  20. The role the safety analysis report and other documents in the licensing procedure in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Albrecht, E.; Ballhaus, S.

    1975-01-01

    Legal requirements for the licensing procedure, requirements for and preparation of licensing documents, authorities and experts participating in the licensing procedure, course of the atomic licensing procedure e.g. application for construction and operation, public hearing, site and concept license, partial licenses. (HP) [de

  1. Methods for calculating energy and current requirements for industrial electron beam processing

    International Nuclear Information System (INIS)

    Cleland, M.R.; Farrell, J.P.

    1976-01-01

    The practical problems of determining electron beam parameters for industrial irradiation processes are discussed. To assist the radiation engineer in this task, the physical aspects of electron beam absorption are briefly described. Formulas are derived for calculating the surface dose in the treated material using the electron energy, beam current and the area thruput rate of the conveyor. For thick absorbers electron transport results are used to obtain the depth-dose distributions. From these the average dose in the material, anti D, and the beam power utilization efficiency, F/sub p/, can be found by integration over the distributions. These concepts can be used to relate the electron beam power to the mass thruput rate. Qualitatively, the thickness of the material determines the beam energy, the area thruput rate and surface dose determine the beam current while the mass thruput rate and average depth-dose determine the beam power requirements. Graphs are presented showing these relationships as a function of electron energy from 0.2 to 4.0 MeV for polystyrene. With this information, the determination of electron energy and current requirements is a relatively simple procedure

  2. Validation, acceptance and licensing

    International Nuclear Information System (INIS)

    Wene, C.O.

    1992-01-01

    The licensing process requires communication of complex scientific and technical information. In this paper transfer of such information is discussed using concepts and ideas from systems analysis, cybernetics and argumentation theory. A simple model for the decision process is developed. The analysis stresses the need for careful design of the communication channels between the three systems involved: the political system, the judicial-regulatory system and the scientific-technical community. The Dialogue - Scenario project initiated by the Swedish nuclear Inspectorate is briefly presented

  3. The art and trend of nuclear power plants aging management and licenses renewal activity In USA

    International Nuclear Information System (INIS)

    Zhong Zhimin; Li Jinsong; Zhang Mengyi

    2014-01-01

    This paper briefly introduced the history and the art of nuclear power plants licenses renewal in United State. The aims, working scope, methodology, the art and trend of aging management and its role in license renewal process in United State nuclear power plants license renewal process were discussed in details. Furthermore, the aging management current research focus in United State was described. Then, take into account the AP serials Pressurized Water Reactor and nuclear safety requirements in the regulatory and safety guide in China, some suggestions and recommendation on nuclear power plants aging management were introduced, which will be helpful when we developed related aging management works in China. (authors)

  4. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  5. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  6. The changing shape of U.S. licensing philosophy

    International Nuclear Information System (INIS)

    Remick, F.J.

    1992-01-01

    The shape of U.S. nuclear licensing and regulatory philosophy and process has already changed. The new process requires NRC review and approval of the vendor designs before a prospective utility license applicant purchases the design and begins construction. The new philosophy has resulted from the lessons learned from extensive operating experience accumulated in the United States. New criteria established for judging reactor designs include the capability of future designs to be more tolerant of accidents beyond the traditional design basis events. Qualitative and quantitative goals have been chosen as a guide for allocating resources for regulation of the currently operating plants. The changing shape of nuclear licensing and regulatory philosophy is also a result of economic circumstances in the United States. All will have a better opportunity to take part in the process which is most likely to encourage further development of safe nuclear energy in the United States. (author)

  7. Dose limits and licensing requirements for the limitation of the emission of radioactive materials from nuclear power stations in the FRG and the USA

    Energy Technology Data Exchange (ETDEWEB)

    Schwibach, J; Huber, O

    1975-08-01

    In licensing the operation of nuclear power plants in the FRG and USA, particular limitations of the release of radioactive materials in the air and water are layed down to correspond to the protective laws of radiation and environmental protection. The first limiting recommendations for the removal of radioactive waste waters were worked out in 1965 in the FRG and in 1968/69 for the removal of radioactive exhaust air of nuclear power plants. Based on this, in 1975 these relevant regulations were included in the draft of the new radiation protection specification. In 1971, these type of guidelines were put to discussion in the USA and were dismissed in 1975 in a licensing regulation of the NRC. These regulations or guidelines differ in their various dose limits. For example, the German dose limits of 30 mrem/a whole body dose for radioactive materials in the exhaust air of nuclear power plants and of 90 mrem/a for the thyroid dose through radioiodine via the exposure exhaust air-pasture-cow-milk-infant are often compared to the American dose limits of 5 mrem/a whole body dose and 15 mrem/a skin dose as well as 15 mrem/a thyroid dose. Such a numerical comparison is, howewer, wrong. The dose limits used in the FRG are, e.g., not to be exceeded. Furthermore, in the FRG, all contributions to be calculated on one site are to be considered. In the USA, the corresponding values are only valid for actual exposure paths due to the emission of a power reactor. They can be multiply exceeded. Thus the German licensing practise is clearly more restrictive.

  8. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  9. Implications of ITER requirements on R and D of RF heating and current drive systems

    International Nuclear Information System (INIS)

    Bosia, G.

    2002-01-01

    A strategic, rather than auxiliary role is assigned to H and CD systems in ITER-FEAT, as all operation phases are driven and controlled by heating and current drive (H and CD) systems. RF systems (Electron Cyclotron, Ion Cyclotron and Lower Hybrid), planned to contribute for ∼60% of ITER auxiliary power (72 MW), still require different level of pre-industrial technology development to operate in ITER at the required level of efficiency and religiosite. In this paper, RF H and CD systems technical and operational issues are reviewed and future R and D actions at CEA-Cadarache discussed, with the aim of providing a demonstration of all RF H and CD systems, within the current ITER construction time scale. The need and the economical advantage of an early on- and off- plasma design validation program for ITER-like RF devices (such as launcher and/or power sources), is also discussed with the aim of identifying and resolving operational issues. (author)

  10. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  11. IAEA news: • Newcomer countries face common challenges in nuclear infrastructure development. • Safety and licensing requirements for small modular reactors: IAEA hosts first workshop for regulators. • IAEA reaches milestone in disposal of radioactive sources

    International Nuclear Information System (INIS)

    Kollar, Lenka; Dyck, Elisabeth; Dixit, Aabha; Gaspar, Miklos; Gil, Laura

    2016-01-01

    • Newcomer countries face common challenges in nuclear infrastructure development: Countries embarking on a nuclear power programme need to make sure that the development of their legal, regulatory and support infrastructure keeps pace with the construction of the power plant itself. This is the only way to ensure that the programme proceeds in a safe, secure and sustainable way, concluded participants of a workshop on nuclear power infrastructure development hosted at the IAEA last February. • Safety and licensing requirements for small modular reactors: IAEA hosts first workshop for regulators: A new generation of advanced, prefab nuclear power reactors called small modular reactors (SMRs) could be licensed and hit the market as early as 2020, and the IAEA is helping regulators prepare for their debut. In a series of workshops that began earlier this year, the IAEA is working closely with regulators on approaches to safety and licensing ahead of potential SMR deployment worldwide. • IAEA reaches milestone in disposal of radioactive sources: Successful tests of a promising technology for moving and storing low level radioactive sealed sources are paving the way for a new disposal method for dealing with small volumes of radioactive waste around the world. The method, which involves placing and covering sealed sources in a narrow hole a few hundred metres deep, would allow countries to safely and securely take charge of their own disused radioactive sources. The proof of concept for the technology was tested in Croatia late last year — without the use of actual radioactive material.

  12. Current trends and future requirements for the mass spectrometric investigation of microbial, mammalian and plant metabolomes

    International Nuclear Information System (INIS)

    Dunn, Warwick B

    2008-01-01

    The functional levels of biological cells or organisms can be separated into the genome, transcriptome, proteome and metabolome. Of these the metabolome offers specific advantages to the investigation of the phenotype of biological systems. The investigation of the metabolome (metabolomics) has only recently appeared as a mainstream scientific discipline and is currently developing rapidly for the study of microbial, plant and mammalian metabolomes. The metabolome pipeline or workflow encompasses the processes of sample collection and preparation, collection of analytical data, raw data pre-processing, data analysis and data storage. Of these processes the collection of analytical data will be discussed in this review with specific interest shown in the application of mass spectrometry in the metabolomics pipeline. The current developments in mass spectrometry platforms (GC–MS, LC–MS, DIMS and imaging MS) and applications of specific interest will be highlighted. The current limitations of these platforms and applications will be discussed with areas requiring further development also highlighted. These include the detectable coverage of the metabolome, the identification of metabolites and the process of converting raw data to biological knowledge. (review article)

  13. Decay power evaluation for licensing analysis

    International Nuclear Information System (INIS)

    Tran, H.; Schrock, V.E.

    1987-01-01

    The ANSI/ANS 5.1-1979 Standard on Decay Power in shutdown reactors has been available as the basis for accident analysis for the past 7 yr. The US Nuclear Regulatory Commission has made a commitment to use this standard in new licensing approaches and has approved a licensing model for boiling water. More sweeping changes in the licensing rules are currently under review that will involve the use of best-estimate models and a statistical evaluation of the uncertainty (95% confidence level) in the key results. The structure of the decay power standard is well suited for such applications because it provides a statistically meaningful uncertainty in the decay power from fission products. The normalized decay power is a function specific to each point in the reactor volume due to the fact that the fuel composition develops a spatial dependence as burnup proceeds and decay power depends on the mix of fissioning nuclides. For reactor safety calculations it is desirable to employ a single temporal decay power function for the whole core inasmuch as many variations of accident parameters are required. This is the usual approach in large system thermal-hydraulics codes. Such a single representative or generic curve for a specified total operating power history can be acceptable but at the expense of some increase in the uncertainty. In this paper, the author present a method of evaluating the additional uncertainty in the decay power associated with use of a generic curve

  14. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  15. Economics of license renewal in the U.S. - entergy's perspective

    International Nuclear Information System (INIS)

    Young, Garry G.

    2003-01-01

    License renewal of operating nuclear plants in the United States has become one of the most successful U.S. nuclear regulatory activities in the past few years. In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provided the requirements for an operating nuclear plant to seek license renewal. At that time, many people believed that only a select few operating nuclear plants would pursue license renewal and that most plants would operate for no more than 40 years. By mid-2003, the owners of approximately 52% of the U.S. nuclear fleet of 103 operating nuclear plants have decided to pursue license renewal and more are expected to follow. This change in direction since 1995 can be attributed to the improving economics of U.S. nuclear power plant operation and to the improved regulatory process resulting from the 1995 revision to 10 CFR Part 54. In 2000, Entergy submitted a license renewal application for Arkansas Nuclear One, Unit 1 (ANO-1). This application was the third to be submitted to the NRC at a time when it was still unclear how successful the regulatory process might be. However, less than 17 months later, in June 2001, the NRC granted a renewed operating license for ANO-1 at a total cost of approximately $11 million. Due in part to the ANO-1 license renewal success, Entergy now has tentative plans to pursue license renewal for the entire fleet of operating nuclear power plants. Without license renewal, Entergy's current nuclear fleet capacity of approximately 9,000 MW(e) would begin to decline in 2012. With license renewal, Entergy's nuclear fleet capacity can remain in place until 2032. This projection does not include the expected improvements in capacity due to power uprate that is currently planned. The combination of power uprate and license renewal will add significant economic value to Entergy's nuclear fleet. One of the major factors in strong performance is capacity factor. In 1990, the average

  16. Qualification, training, licensing/authorization and retraining of operating personnel in nuclear power plants. Some requirements and practices commonly shared in the European Community Member States

    International Nuclear Information System (INIS)

    Pele, J.P.

    1987-01-01

    At the end of the fifties a treaty was signed instituting between six countries of the European Community for Atomic Energy, or in brief, Euratom. This treaty, in addition to the Common Market Treaty and the Coal and Steel one, constitutes the legal frame of the European Community which, at present, comprises 12 Member States. A commission, the so-called Commission of the European Communities (or in brief CEC) has to implement the provisions laid down in the treaties. Qualification, training, licensing and re-training of operating personnel have been the subjects of an in-depth exchange of views and information in the frame of the work conducted by the Commission. The evaluation of the regulations and practices in countries of the EC and some other countries having a large nuclear energy program, has led to the identification of some generally valid concepts. This synthesis, made with the assistance of a consultant, is now published under the form of an EUR report (EUR 10981). The main topics addressed within this report are the following: shift staffing and staffing of the control room, personnel selection, qualifications necessary for recruitment, training and retraining, and licensing/authorization

  17. Licensing Support System: Preliminary data scope analysis

    International Nuclear Information System (INIS)

    1989-01-01

    The purpose of this analysis is to determine the content and scope of the Licensing Support System (LSS) data base. Both user needs and currently available data bases that, at least in part, address those needs have been analyzed. This analysis, together with the Preliminary Needs Analysis (DOE, 1988d) is a first effort under the LSS Design and Implementation Contract toward developing a sound requirements foundation for subsequent design work. These reports are preliminary. Further refinements must be made before requirements can be specified in sufficient detail to provide a basis for suitably specific system specifications. This document provides a baseline for what is known at this time. Additional analyses, currently being conducted, will provide more precise information on the content and scope of the LSS data base. 23 refs., 4 figs., 8 tabs

  18. Groundfish/Crab License Limitation Program (LLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — As of January 1, 2000 a Federal License Limitation Program (LLP) license is required for vessels participating in directed fishing for LLP groundfish species in the...

  19. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  20. Foundation for the adequacy of the licensing bases

    International Nuclear Information System (INIS)

    1991-12-01

    The objective of this report is to describe the regulatory processes that assures that any plant-specific licensing bases will provide reasonable assurance that the operation of nuclear power plants will not be inimical to the public health and safety to the end of the renewal period. It is on the adequacy of this process that the Commission has determined that a formal renewal licensing review against the full range of current safety requirements would not add significantly to safety and is not needed to assure that continued operation throughout the renewal term is not inimical to the public health and safety or common defense and security. This document illustrates in general terms how the regulatory process has evolved in major safety issue areas. It also provides examples illustrating why it is unnecessary to re-review an operating plant's basis, except for age-related degradation unique to license renewal, at the time of license renewal. The report is a supplement to the Statement of Considerations for the Nuclear Regulatory Commission's rule (10 CFR Part 54) that established the criteria and standards governing nuclear power plant license renewal

  1. Considerations about the licensing process of special nuclear industrial facilities

    Energy Technology Data Exchange (ETDEWEB)

    Talarico, M.A., E-mail: talaricomarco@hotmail.com [Marinha do Brasil, Rio de Janeiro, RJ (Brazil). Coordenacao do Porgrama de Submarino com Propulsao Nuclear; Melo, P.F. Frutuoso e [Coordenacao dos Programas de Pos-Graduacao em Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Nuclear

    2015-07-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  2. Considerations about the licensing process of special nuclear industrial facilities

    International Nuclear Information System (INIS)

    Talarico, M.A.; Melo, P.F. Frutuoso e

    2015-01-01

    This paper brings a discussion about the challenges involved in the development of a new kind of nuclear facility in Brazil, a naval base for nuclear submarines, with attention to the licensing process and considerations about the risk-informed decision making application to the licensing process. Initially, a model of such a naval base, called in this work, special industrial facility, is proposed, with its systems and respective sets of basic requirements, in order to make it possible the accomplishment of the special industrial facility support function to the nuclear submarine. A discussion about current challenges to overcome in this project is presented: the challenges due to the new characteristics of this type of nuclear facility; existence of several interfaces between the special industrial facilities systems and nuclear submarine systems in design activities; lack of specific regulation in Brazil to allow the licensing process of special industrial facilities by the nuclear safety authority; and comments about the lack of information from reference nuclear facilities, as is the case with nuclear power reactors (for example, the German Grafenrheinfeld nuclear plant is the reference plant for the Brazilian Angra 2 nuclear plant). Finally, in view of these challenges, an analysis method of special industrial facility operational scenarios to assist the licensing process is proposed. Also, considerations about the application of risk-informed decision making to the special industrial facility activity and licensing process in Brazil are presented. (author)

  3. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  4. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  5. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  6. License plate recognition using DTCNNs

    NARCIS (Netherlands)

    ter Brugge, M.H; Stevens, J.H; Nijhuis, J.A G; Spaanenburg, L; Tavsanonoglu, V

    1998-01-01

    Automatic license plate recognition requires a series of complex image processing steps. For practical use, the amount of data to he processed must be minimized early on. This paper shows that the computationally most intensive steps can be realized by DTCNNs. Moreover; high-level operations like

  7. Current status and requirements for position-sensitive detectors in medicine

    CERN Document Server

    Speller, R

    2002-01-01

    This review considers the current status of detector developments for medical imaging using ionising radiation. This field is divided into two major areas; the use of X-rays for transmission imaging and the use of radioactive tracers in emission imaging (nuclear medicine). Until recently, most detector developments were for applications in nuclear medicine. However, in the past 5 years new developments in large area, X-ray-sensitive detectors have meant that both application domains are equally served. In X-ray imaging, work in CT and mammography are chosen as examples of sensor developments. Photodiode arrays in multi-slice spiral CT acquisitions are described and for mammography the use of amorphous silicon flat panel arrays is considered. The latter is an excellent example where new detector developments have required a re-think of traditional imaging methods. In gamma-ray imaging the recent developments in small area, task-specific cameras are described. Their limitations and current proposals to overcome...

  8. Current Status and Perspectives for the Estimation of Crop Water Requirements from Earth Observation

    Directory of Open Access Journals (Sweden)

    Guido D’Urso

    2010-06-01

    Full Text Available This paper presents an overview of current techniques and recent developments in the application of Earth Observationdata for assessing crop water requirements. During recent years there has been much progress in understandingland surface-atmosphere processes and their parameterisation in the management of land and water resources.This knowledge can be combined with the potentiality of Earth Observation techniques from space, whichare able to provide detailed information for monitoring agricultural systems.As today, two main developments in the field of Earth Observation data acquisition and analysis have occurred:a availability of new generations of sensors, with enhanced spectral and spatial resolution;b detailed knowledge of the processes that determine the response of land surface as detected from remote sensorsin different regions of the electromagnetic spectrum.These advancements have made possible a “quantitative” approach in the interpretation of Earth Observation data,ready for being transferred to operative applications i.e. for irrigation scheduling and water management. Thispaper presents a review of current applications of optical data in the visible and near infrared spectral regions, withparticular emphasis to the experiences developed by the author within AQUATER and other research projectsproject.

  9. Quality control of brachytherapy equipment in the Netherlands and Belgium: current practice and minimum requirements

    International Nuclear Information System (INIS)

    Elfrink, Robert J.M.; Kolkman-Deurloo, Inger-Karine K.; Kleffens, Herman J. van; Rijnders, Alex; Schaeken, Bob; Aalbers, Tony H.L.; Dries, Wim J.F.; Venselaar, Jack L.M.

    2002-01-01

    Background and purpose: Brachytherapy is applied in 39 radiotherapy institutions in The Netherlands and Belgium. Each institution has its own quality control (QC) programme to ensure safe and accurate dose delivery to the patient. The main goal of this work is to gain insight into the current practice of QC of brachytherapy in The Netherlands and Belgium and to reduce possible variations in test frequencies and tolerances by formulating a set of minimum QC-requirements. Materials and methods: An extensive questionnaire about QC of brachytherapy was distributed to and completed by the 39 radiotherapy institutions. A separate smaller questionnaire was sent to nine institutions performing intracoronary brachytherapy. The questions were related to safety systems, physical irradiation parameters and total time spent on QC. The results of the questionnaires were compared with recommendations given in international brachytherapy QC reports. Results: The answers to the questionnaires showed large variations in test frequencies and test methods. Furthermore, large variations in time spent on QC exist, which is mainly due to differences in QC-philosophy and differences in the available resources. Conclusions: Based on the results of the questionnaires and the comparison with the international recommendations, a set of minimum requirements for QC of brachytherapy has been formulated. These guidelines will be implemented in the radiotherapy institutions in The Netherlands and Belgium

  10. H.R. 4895: a bill to establish a requirement that no person may offer any high-level radioactive waste for transportation in interstate commerce unless licensed for such offering by the Nuclear Regulatory Commission, and for other purposes. Introduced in the House of Representatives, Ninety-Ninth Congress, Second Session, May 22, 1986

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The Nuclear Waste Transportation Act requires that anyone offering high-level radioactive waste for transportation in interstate commerce must be licensed. The bill describes the qualifications and requirements for obtaining a license either to offer the wastes or to transport it, the procedures for issuance, notification to political subdivisions and Indian tribes, and routing. It also includes time restrictions and enforcement authority. High-level radioactive materials include spent nuclear fuel and reprocessing materials

  11. Approach to integrate current safeguards measures with additional protocol requirements at national level

    International Nuclear Information System (INIS)

    Ramirez, R.

    2001-01-01

    Peru adhered to the Additional Protocol in March 2000 which was also approved by the Congress in May 2001. After approval by law the obligations derived from this Additional Protocol will be in force after 180 days. After the signing of the Protocol an approach was designed to help better fulfill these requirements in an integrated way with the previous measures. As first stage, a review of the current state of safeguards was undertaken. Under the current agreement (an INFCIRC/153 type agreement) the reporting is less complicated and inexpensive to be carried out because these reports include only the declared nuclear material and the features of declared facilities where the nuclear material is used. No other related facility or material or activity needs to be declared. In Peru there are only two MBAs where low enriched uranium (LEU) is used and the record system includes general ledgers, inventory records and operational books. The results of national inspections and copies of reports and communications sent to the IAEA are also kept in this system. Under the agreement and subsidiary arrangements material balance reports (MBR), physical inventory listings (PIL) and inventory change reports (ICR) are prepared and submitted to the IAEA at scheduled periods. The MBR and PIL reports are sent after yearly regular inspections carried out by the IAEA. The ICR is sent just every time when an import or export of nuclear material is made. The time devoted to carry out all of these activities is not so extensive for both the State System for Accountability and Control (SSAC) and the users because of the limited nuclear activities in the country. Because of the characteristics and limited quantities of nuclear material the efforts for inspection and reporting activities are few. Another subject under review was the procedure for controlling the imports of nuclear material. Under the current agreement this subject was not a problem, as all of the radioactive and nuclear

  12. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  13. Regulatory licensing, status summary report; Systematic evaluation program

    International Nuclear Information System (INIS)

    1978-01-01

    This document is part of a management information system presenting a logical flow of events that represent the evaluation of 11 of the older operating nuclear reactors. Information collected will be used to determine the degree to which the 11 plants meet current licensing requirements and to develop an overall balanced position concerning any needed backfitting of the facilities and the documentation of the results of such evaluations

  14. Safety features and licensing of CNNC-ACP100

    Energy Technology Data Exchange (ETDEWEB)

    Zhong, F., E-mail: Zhongfj2000@163.com [Nuclear Power Inst. of China, National Key Lab. of Science and Technology on Reactor System Design Technology (China)

    2014-07-01

    ACP100 is an innovatory modular pressurized water reactor, the engineering safety systems fully adopt passive safety design technology. Its inherent safety and passive features/systems are verified via testing facilities and are highlighted at certain levels of defence in depth. The licensing of ACP 100 is within current LWR framework and meets up-to-date codes and requirements in nuclear safety. (author)

  15. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  16. Licensing of simple digital devices

    International Nuclear Information System (INIS)

    Jackson, T. W.

    2008-01-01

    The inability to guarantee error-free software gave rise to the potential for common-cause failure of digital safety systems in nuclear power plants. To address this vulnerability, the U. S. Nuclear Regulatory Commission (NRC) required a quality software development process and a defense-in-depth and diversity analysis for digital safety systems. As a result of recent interim [NRC] staff guidance in the digital instrumentation and control (I and C) area, licensing of simple digital devices decreases some regulatory burden with respect to demonstrating a quality software development process and defense-in-depth and diversity analysis. This paper defines simple digital devices and addresses the interim staff guidance that applies to such devices. The paper also highlights the technical aspects that affect the licensing of such devices and incorporates licensing experience in the U.S. to date. (authors)

  17. To License or Not to License: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    Directory of Open Access Journals (Sweden)

    Thomas Lonardo

    2008-09-01

    Full Text Available In this paper the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner licensing. The authors conclude that states must differentiate between Private Investigator and Digital Examiner licensing requirements and oversight.

  18. Demonstrating safety during license renewal should not be a large task

    International Nuclear Information System (INIS)

    Berto, D.S.

    1993-01-01

    The principal regulatory goal related to nuclear power plant operation is to ensure the health and safety of the public. The principal goal of extended plant operation via the license renewal process is also to ensure the health and safety of the public. The license renewal documentation issued by the Nuclear Regulatory Commission (NRC) provides guidance on what will be acceptable to the NRC in a license renewal application to demonstrate that this goal will be met. Application of this guidance is currently open to wide interpretation, with many of the current approaches proving to be extremely costly, complex, and uncertain of acceptability. This paper evaluates the requirements necessary to ensure the continued health and safety of the public during any license renewal term. This evaluation is based on the stated goals of the License Renewal Rule and on the published bases for the Rule. An approach to License Renewal is recommended that: (1) meets the stated goals of the NRC; (2) is consistent with current regulatory practices; and (3) will continue to ensure the health and safety of the public. This recommended approach is also much less costly than other current approaches, and can be easily agreed to by all participants. This approach will meet regulatory goals, while removing the cost and uncertainty obstacles currently being confronted by utilities. Providing a viable approach to license renewal will allow the renewal process to be pursued by utilities. Without such an approach, safe and reliable nuclear power plants will be permanently shut down at the arbitrary 40 year license limit

  19. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  20. Radiation protection in medical research. Licensing requirement for the use of radiation and advice for the application procedure; Strahlenschutz in der medizinischen Forschung. Genehmigungsbeduerftigkeit von Strahlenanwendungen und Hinweise zum Antragsverfahren

    Energy Technology Data Exchange (ETDEWEB)

    Minkov, V.; Klammer, H.; Brix, G. [Bundesamt fuer Strahlenschutz, Abteilung fuer medizinischen und beruflichen Strahlenschutz, Neuherberg (Germany)

    2017-07-15

    In Germany, persons who are to be exposed to radiation for medical research purposes are protected by a licensing requirement. However, there are considerable uncertainties on the part of the applicants as to whether licensing by the competent Federal Office for Radiation Protection is necessary, and regarding the choice of application procedure. The article provides explanatory notes and practical assistance for applicants and an outlook on the forthcoming new regulations concerning the law on radiation protection of persons in the field of medical research. Questions and typical mistakes in the application process were identified and evaluated. The qualified physicians involved in a study are responsible for deciding whether a license is required for the intended application of radiation. The decision can be guided by answering the key question whether the study participants would undergo the same exposures regarding type and extent if they had not taken part in the study. When physicians are still unsure about their decision, they can seek the advisory service provided by the professional medical societies. Certain groups of people are particularly protected through the prohibition or restriction of radiation exposure. A simplified licensing procedure is used for a proportion of diagnostic procedures involving radiation when all related requirements are met; otherwise, the regular licensing procedure should be used. The new radiation protection law, which will enter into force on the 31st of december 2018, provides a notification procedure in addition to deadlines for both the notification and the licensing procedures. In the article, the authors consider how eligible studies involving applications of radiation that are legally not admissible at present may be feasible in the future, while still ensuring a high protection level for study participants. (orig.) [German] Personen, bei denen Strahlenanwendungen zum Zweck der medizinischen Forschung durchgefuehrt

  1. Licensing, supervision, retrofitting

    International Nuclear Information System (INIS)

    Steinkemper, H.

    1991-01-01

    The following proposals for the amendment to the Atomic Energy Act are made: the term of provisions against damage and the content and scope of the principle of commensurability should be defined by law. Their concretization should be left to the level of the statutory instruments and technical codes. In usage the scope of application of the subsequent obligation should be approximated to the category of element relevant to licensing. Lability to indemnification for subsequent obligations should be abolished. The need for a backfitting licence in the case of 'substantial' alterations requires a closer definition. A legal obligation should be placed on operators of nuclear reactors to carry out periodical safety checks. (orig./HSCH) [de

  2. Regulatory analysis for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    This regulatory analysis provides the supporting information for the final rule (10 CFR Part 54) that defines the Nuclear Regulatory Commission's requirements for renewing the operating licenses of commercial nuclear power plants. A set of four specific alternatives for the safety review of license renewal applications is defined and evaluated. These are: Alternative A-current licensing basis; Alternative B-extension of Alternative A to require assessment and managing of aging; Alternative C -- extension of Alternative B to require assessment of design differences against selected new-plant standards using probabilistic risk assessment; and Alternative D -- extension of Alternative B to require compliance with all new-plant standards. A quantitative comparison of the four alternatives in terms of impact-to-value ratio is presented, and Alternative B is the most cost-beneficial safety review alternative

  3. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  4. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  5. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  6. The Transaction Cost Benefits of Electronic Patent Licensing Platforms: A Discussion at the Example of the PatentBooks Model

    OpenAIRE

    Ghafele, Roya; Gibert, Benjamin

    2011-01-01

    Current mechanisms to compensate inventors and improve legal access to their inventions remain ineffective. Manufacturers encounter significant transaction costs in the process of licensing the multitude of patent rights implicated in their products. High-technology product manufacturing requires access to a diverse pool of technologies that are owned by different organizations all over the world. The transaction costs of licensing these disparate rights are inhibiting unlicensed manufacturer...

  7. Customizable orthopaedic oncology implants: one institution's experience with meeting current IRB and FDA requirements.

    Science.gov (United States)

    Willis, Alexander R; Ippolito, Joseph A; Patterson, Francis R; Benevenia, Joseph; Beebe, Kathleen S

    2016-01-01

    Customizable orthopaedic implants are often needed for patients with primary malignant bone tumors due to unique anatomy or complex mechanical problems. Currently, obtaining customizable orthopaedic implants for orthopaedic oncology patients can be an arduous task involving submitting approval requests to the Institutional Review Board (IRB) and the Food and Drug Administration (FDA). There is great potential for the delay of a patient's surgery and unnecessary paperwork if the submission pathways are misunderstood or a streamlined protocol is not in place. The objective of this study was to review the existing FDA custom implant approval pathways and to determine whether this process was improved with an institutional protocol. An institutional protocol for obtaining IRB and FDA approval for customizable orthopaedic implants was established with the IRB at our institution in 2013. This protocol was approved by the IRB, such that new patients only require submission of a modification to the existing protocol with individualized patient information. During the two-year period of 2013-2014, eight patients were retrospectively identified as having required customizable implants for various orthopaedic oncology surgeries. The dates of request for IRB approval, request for FDA approval, and total time to surgery were recorded, along with the specific pathway utilized for FDA approval. The average patient age was 12 years old (7-21 years old). The average time to IRB approval of a modification to the pre-approved protocol was 14 days (7-21 days). Average time to FDA approval after submission of the IRB approval to the manufacturer was 12.5 days (7-19 days). FDA approval was obtained for all implants as compassionate use requests in accordance with Section 561 of the Federal Food Drug and Cosmetic Act's expanded access provisions. Establishment of an institutional protocol with pre-approval by the IRB can expedite the otherwise time-consuming and complicated

  8. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Science.gov (United States)

    2013-05-20

    ... Facility Operating License No. R-103 AGENCY: Nuclear Regulatory Commission. ACTION: License renewal... the renewal of Facility Operating License No. R-103 (``Application''), which currently authorizes the... application for the renewal of Facility Operating License No. R-103, which, currently authorizes the licensee...

  9. Recent developments in Canadian nuclear power plant licensing practices

    International Nuclear Information System (INIS)

    Marchildon, P.

    1985-06-01

    This paper examines the dominant factors which have influenced the safety evaluation and licensing process of current 600 MW reactors. It describes possible modifications to the process which are being considered for the licensing of a second 600 MW reactor at Point Lepreau. The key element is a firm licensing agreement covering the entire licensing cycle, to be established between the proponent and the AECB before a construction licence is issued. Progress accomplished to date in reaching such an agreement is described

  10. The exemption from the requirement of registration and/or licensing of some sources. machines and devices emitting ionizing and /or on ionizing radiation: a proposed draft for Israeli regulations

    Energy Technology Data Exchange (ETDEWEB)

    Schlesinger, T; Margaliot, M [Israel Atomic Energy Commission, Yavne (Israel). Soreq Nuclear Research Center

    1997-11-16

    The licensing and authorization of the import, purchase, distribution, transportation and application of radioactive materials and devices emitting ionizing and/or non-ionizing radiation are carried out in Israel by the Ministries of the Environment and of Health. The legal basis for file authority of these Ministries in radiation protection matters is file {sup P}harmacists Regulation- Radioactive Elements and Products Thereof, 1981 (revision 1994) (PRREPT). Licenses are issued by the Chief Radiation Executive (CUE) appointed by the Minister of the Environment and the Minister of Health. The Regulations include a clause which enables the CUE to exempt certain amounts of radioactive materials from file requirements laid down in the PRREPT. The exemption clause is general and does not indicate the types and amounts of radioactive material may be exempted. The proposed draft Israeli regulations are related to exemption of some sources, machines and devices emitting ionizing and non-ionizing radiation, wife a suggestion to extend file above mentioned exemption clause to include some machines and devices and to provide an explicit and detailed list of materials, sources and devices to be exempted. Among these are the following: (authors)

  11. The exemption from the requirement of registration and/or licensing of some sources. machines and devices emitting ionizing and /or on ionizing radiation: a proposed draft for Israeli regulations

    International Nuclear Information System (INIS)

    Schlesinger, T.; Margaliot, M.

    1997-01-01

    The licensing and authorization of the import, purchase, distribution, transportation and application of radioactive materials and devices emitting ionizing and/or non-ionizing radiation are carried out in Israel by the Ministries of the Environment and of Health. The legal basis for file authority of these Ministries in radiation protection matters is file P harmacists Regulation- Radioactive Elements and Products Thereof, 1981 (revision 1994) (PRREPT). Licenses are issued by the Chief Radiation Executive (CUE) appointed by the Minister of the Environment and the Minister of Health. The Regulations include a clause which enables the CUE to exempt certain amounts of radioactive materials from file requirements laid down in the PRREPT. The exemption clause is general and does not indicate the types and amounts of radioactive material may be exempted. The proposed draft Israeli regulations are related to exemption of some sources, machines and devices emitting ionizing and non-ionizing radiation, wife a suggestion to extend file above mentioned exemption clause to include some machines and devices and to provide an explicit and detailed list of materials, sources and devices to be exempted. Among these are the following: (authors)

  12. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV; Especificacion de los requerimientos para tramitar una licencia de una instalacion independiente de almacenamiento temporal en seco de combustible gastado (ISFSI) en el sitio de la CNLV

    Energy Technology Data Exchange (ETDEWEB)

    Serrano R, M. L., E-mail: mlserrano@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico)

    2015-09-15

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  13. Conversion to low-enriched fuel in research reactor aspects of licensing the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Jacquemin, J.

    1985-01-01

    Conversion to low-enriched fuel and usage of new developed highly densified fuel in research-reactors will be an essential alteration in operating the reactor. According to the German Energy Act this has to be licensed. here might be some risk to the licensee of an older research-reactor by suspending his operating license because he cannot meet current requirements to be fulfilled or because of a court decision.Disposal of irradiated fuel elements of the new fuel type is a further significant problem which has to be solved before issuing a new license. (author)

  14. CHOOSING THE RIGHT FORM OF LICENSING A BUSINESS IN ROMANIA

    Directory of Open Access Journals (Sweden)

    ROIBAN Roxana Nadina

    2012-12-01

    Full Text Available Choosing the most appropriate form of licensing a business is an important decision not easy to be made by an entrepreneur and it should be taken only after he has the required skills and abilities to do so. The business idea should harmonize with the business environment and its future trends, with the existing opportunities and the future products or services that the company will provide and not least the entrepreneur has to make sure that he has sufficient resources to get started. We consider that every business has a number of features that make certain forms of licensing to be more suitable than others. This paper aims to present a multitude of items to be reviewed by an entrepreneur at the start-up in order to choose the most appropriate licensing type for his business. Given that our country's law allows entrepreneurs to license their businesses in several forms, the decision to choose between many existing possibilities is a very important one for the future good of the business. Currently in our country there are two major laws governing the licensing of a business. The first one is the republished and subsequently amended Company Law number 31/1990 and the second, the Government Emergency Ordinance number 44/2008 regarding the economic activities of the Sole traders, Individual enterprises and Family enterprises. The Company Law number 31/1990 allows companies to choose between one of the five types of business entities that can operate in Romania: General partnership (in Romanian SNC, Limited partnership (in Romanian SCS, Limited partnerships by shares (in Romanian SCA, Joint stock company (in Romanian S.A. and Limited liability company (in Romanian S.R.L.. GEO number 44/2008 on economic activities of the Sole traders, Individual enterprises and Family enterprises regulates the licensing and the activity of a Sole traders, Individual enterprises and Family enterprises.

  15. ITER Safety and Licensing

    International Nuclear Information System (INIS)

    Girard, J-.P; Taylor, N.; Garin, P.; Uzan-Elbez, J.; GULDEN, W.; Rodriguez-Rodrigo, L.

    2006-01-01

    The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseille. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners organized in domestic agencies for the in-kind procurement of components is a key issue for the success of the experimentation. ITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production. The main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions. The licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the Preliminary Safety Report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to

  16. Trends in nuclear licensing

    International Nuclear Information System (INIS)

    Dalton, N.W.

    1990-01-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  17. Trends in nuclear licensing

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, N W [Council for Nuclear Safety, Hennopsmeer, Pretoria (South Africa)

    1990-06-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  18. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  19. Libraries and licensing

    Directory of Open Access Journals (Sweden)

    Maja Žumer

    2001-01-01

    Full Text Available In the mid 90s, the abundance of various electronic publications exposed libraries to the problems of licensing electronic content. Various licensing principles have been prepared recently to help libraries in the process; it can be said that in general, the knowledge of licensing issues has improved in libraries of all types. Libraries form consortia in order to gain stronger negotiating positions and obtain better conditions.In the article, new licensing principles are presented in more detail, as well as some domestic and foreign experiences with consortia forming.

  20. Discovering Software License Constraints : Identifying a Binary’s Sources by Tracing Build Processes

    NARCIS (Netherlands)

    Van der Burg, S.; Davies, J.; Dolstra, E.; German, D.M.; Hemel, A.

    2012-01-01

    With the current proliferation of open source software components, intellectual property in general, and copyright law in particular, has become a critical non-functional requirement for software systems. A key problem in license compliance engineering is that the legal constraints on a product

  1. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  2. Investigation of the current requirements engineering practices among software developers at the Universiti Utara Malaysia Information Technology (UUMIT) centre

    Science.gov (United States)

    Hussain, Azham; Mkpojiogu, Emmanuel O. C.; Abdullah, Inam

    2016-08-01

    Requirements Engineering (RE) is a systemic and integrated process of eliciting, elaborating, negotiating, validating and managing of the requirements of a system in a software development project. UUM has been supported by various systems developed and maintained by the UUM Information Technology (UUMIT) Centre. The aim of this study was to assess the current requirements engineering practices at UUMIT. The main problem that prompted this research is the lack of studies that support software development activities at the UUMIT. The study is geared at helping UUMIT produce quality but time and cost saving software products by implementing cutting edge and state of the art requirements engineering practices. Also, the study contributes to UUM by identifying the activities needed for software development so that the management will be able to allocate budget to provide adequate and precise training for the software developers. Three variables were investigated: Requirement Description, Requirements Development (comprising: Requirements Elicitation, Requirements Analysis and Negotiation, Requirements Validation), and Requirement Management. The results from the study showed that the current practice of requirement engineering in UUMIT is encouraging, but still need further development and improvement because a few RE practices were seldom practiced.

  3. Current trends in codal requirements for safety in operation of nuclear power plants

    International Nuclear Information System (INIS)

    Srivasista, K.; Shah, Y.K.; Gupta, S.K.

    2006-01-01

    The Code of practice on safety in nuclear power plant operation states the requirements to be met during operation of a nuclear power plant for assuring safety. Among various stages of authorization, regulatory body issues authorization for operation of a nuclear power plant, monitors and enforces regulatory requirements. The responsible organization shall have overall responsibility and the plant management shall have the primary responsibility for ensuring safe and efficient operation of its nuclear power plants. A set of codal requirements covering technical and administrative aspects are mandatory for the plant management to implement to ensure that the nuclear power plant is operated in accordance with the design intent. Requirements on operating procedures and instructions establish operation and maintenance, inspection and testing of the plant in a planned and systematic way. The requirements on emergency preparedness programme establish with a reasonable assurance that, in the event of an emergency situation, appropriate measures can be taken to mitigate the consequences. Commissioning requirements verify performance criteria during commissioning to ensure that the design intent and QA requirements are met. Several modifications in systems important to safety required during operation of a nuclear power plant are regulated. However new operational codal requirements arising out of periodic safety review, operational experience feedback, life management, probabilistic safety assessment, physical security, safety convention and obligations and decommissioning are not covered in the present code of practice for safety in nuclear power plant operation. Codal provisions on 'Review by operating organization on aspects of design having implications on operability' are also required to be addressed. The merits in developing such a methodology include acceptance of the design by operating organization, ensuring maintainability, proper layout etc. in the new designs

  4. Requirements on localized current drive for the suppression of neoclassical tearing modes

    NARCIS (Netherlands)

    Bertelli, N.; De Lazzari, D.; Westerhof, E.

    2011-01-01

    A heuristic criterion for the full suppression of an NTM was formulated as eta(NTM) = j(CD,max)/j(BS) >= 1.2 (Zohm et al 2005 J. Phys. Conf. Ser. 25 234), where j(CD,max) is the maximum in the driven current density profile applied to stabilize the mode and j(BS) is the local bootstrap current

  5. Licensing and supervision of nuclear facilities in Finland; Genehmigung und Aufsicht von nuklearen Anlagen in Finnland

    Energy Technology Data Exchange (ETDEWEB)

    Laaksonen, J. [STUK - Radiation and Nuclear Safety Authority, Helsinki (Finland)

    2006-01-01

    In Finland, the licensing process of all nuclear facilities is specified in the Nuclear Energy Act. The licensing procedure comprises three steps, each of which requires a decision by the government: basic decision, construction permit, and operating license. All licensing decisions are taken upon application to the Ministry of Trade and Industry. The Ministry invites comments and opinions on a broad basis and drafts a statement for the government. The basic decision by the government is political, pre-supposing a positive statement by the Central Office for Nuclear Safety (STUK) and a positive decision by the local government of the planned plant location. The construction permit and the operating license are mainly based on points of nuclear safety. STUK is the independent nuclear supervisory agency with administrative powers; its staff has the technical and scientific competence required for safety assessments and for supervision. STUK operates under the supervision of the Ministry for Social Affairs and Health which, to demonstrate its independence, has no duties in the energy sector and, in addition, supervises STUK in administrative matters, not in scientific and technical decisions. Internal rules of STUK ensure neutrality also of its staff in matters of energy policy. The activities of STUK as a supervisory and licensing authority in Finland are described in detail for the management of spent nuclear fuel and the new Olkiluoto 3 nuclear power plant currently under construction. (orig.)

  6. 78 FR 73553 - Prospective Grant of Exclusive License: Development of Cripto-1 Point of Care (POC) Tests and...

    Science.gov (United States)

    2013-12-06

    ... contemplated exclusive license should be directed to: Eggerton Campbell, Ph.D. Licensing and Patenting Manager... colon, pancreas, stomach, gallbladder, breast, lung, endometrium and cervix. Current methodologies of...

  7. Impact on future licensing

    International Nuclear Information System (INIS)

    Pasedag, W.F.; Postma, A.K.

    1986-01-01

    The TMI-2 accident has had a dramatic impact on the assessment of severe accidents, particularly on accident source term assumptions. TMI not only demonstrated that regulatory interest in severe accidents is appropriate, but also illustrated our limited understanding of fission product behaviour under degraded core conditions. The resulting reassessment of accident source terms has resulted in a concerted, world-wide research effort, which has produced a new source term estimation methodology. In order to assess the potential impact of the application of this methodology on regulatory requirements, a comparison with the approach used in licensing analyses is necessary. Such a comparison performed for the TMI-2 accident sequence, shows that differences in assumptions concerning accident progression far outweigh the differences in the methodology per se. In particular, the degree of conservatism incorporated into assumptions concerning operator action and containment response has over-riding influence on source term estimates. A major contribution to the impact of the new source term methodology on regulatory requirements, therefore, is its capability to provide the improved level of understanding necessary for reassessment of regulatory assumptions in this area

  8. Requirements for alignment of electron cyclotron current drive for neoclassical tearing mode stabilization in ITER

    International Nuclear Information System (INIS)

    La Haye, R.J.; Ferron, J.R.; Humphreys, D.A.; Luce, T.C.; Petty, C.C.; Prater, R.; Strait, E.J.; Welander, A.S.

    2008-01-01

    ITER will rely on electron cyclotron stabilization of neoclassical tearing mode islands. The large size and low torque applied in ITER imply slow plasma rotation and susceptibility to island locking by the resistive wall; locking is likely to lead to a loss of the high confinement H-mode, a beta collapse and possibly disruption. 'Front' steering of the launcher, with narrower electron cyclotron current drive (ECCD), has resolved the issue in 'remote' steering of the driven current being too broad and relatively ineffective. However, narrower current drive places demands on alignment of the current drive on the rational surface that is being stabilized. DIII-D alignment techniques with and without (preemptive) an island are reviewed. The results are used to check models for the effect of misalignment and are then applied to ITER. Criteria for accuracy of alignment as a function of injected power and for the necessary time response of the controller are presented

  9. Licensed bases management for advanced nuclear plants

    International Nuclear Information System (INIS)

    O'Connell, J.; Rumble, E.; Rodwell, E.

    2001-01-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  10. Licensed bases management for advanced nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, J [Duke Engineering and Services, Marlborough, MA (United States); Rumble, E; Rodwell, E [EPRI, Palo Alto, CA (United States)

    2001-07-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  11. Licensed bases management for advanced nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, J. [Duke Engineering and Services, Marlborough, MA (United States); Rumble, E.; Rodwell, E. [EPRI, Palo Alto, CA (United States)

    2001-07-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  12. Heating and current drive requirements towards steady state operation in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Poli, F. M.; Kessel, C. E.; Gorelenkova, M. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Bonoli, P. T. [MIT Plasma Science and Fusion Center, Cambridge, MA 02139 (United States); Batchelor, D. B. [Oak Ridge National Laboratory, Oak Ridge, TN 37831-6169 (United States); Harvey, B.; Petrov, Y. [CompX, Box 2672, Del Mar, CA 92014 (United States)

    2014-02-12

    Steady state scenarios envisaged for ITER aim at optimizing the bootstrap current, while maintaining sufficient confinement and stability to provide the necessary fusion yield. Non-inductive scenarios will need to operate with Internal Transport Barriers (ITBs) in order to reach adequate fusion gain at typical currents of 9 MA. However, the large pressure gradients associated with ITBs in regions of weak or negative magnetic shear can be conducive to ideal MHD instabilities, reducing the no-wall limit. The E × B flow shear from toroidal plasma rotation is expected to be low in ITER, with a major role in the ITB dynamics being played by magnetic geometry. Combinations of H/CD sources that maintain weakly reversed magnetic shear profiles throughout the discharge are the focus of this work. Time-dependent transport simulations indicate that, with a trade-off of the EC equatorial and upper launcher, the formation and sustainment of quasi-steady state ITBs could be demonstrated in ITER with the baseline heating configuration. However, with proper constraints from peeling-ballooning theory on the pedestal width and height, the fusion gain and the maximum non-inductive current are below the ITER target. Upgrades of the heating and current drive system in ITER, like the use of Lower Hybrid current drive, could overcome these limitations, sustaining higher non-inductive current and confinement, more expanded ITBs which are ideal MHD stable.

  13. Heating and current drive requirements towards steady state operation in ITER

    Science.gov (United States)

    Poli, F. M.; Bonoli, P. T.; Kessel, C. E.; Batchelor, D. B.; Gorelenkova, M.; Harvey, B.; Petrov, Y.

    2014-02-01

    Steady state scenarios envisaged for ITER aim at optimizing the bootstrap current, while maintaining sufficient confinement and stability to provide the necessary fusion yield. Non-inductive scenarios will need to operate with Internal Transport Barriers (ITBs) in order to reach adequate fusion gain at typical currents of 9 MA. However, the large pressure gradients associated with ITBs in regions of weak or negative magnetic shear can be conducive to ideal MHD instabilities, reducing the no-wall limit. The E × B flow shear from toroidal plasma rotation is expected to be low in ITER, with a major role in the ITB dynamics being played by magnetic geometry. Combinations of H/CD sources that maintain weakly reversed magnetic shear profiles throughout the discharge are the focus of this work. Time-dependent transport simulations indicate that, with a trade-off of the EC equatorial and upper launcher, the formation and sustainment of quasi-steady state ITBs could be demonstrated in ITER with the baseline heating configuration. However, with proper constraints from peeling-ballooning theory on the pedestal width and height, the fusion gain and the maximum non-inductive current are below the ITER target. Upgrades of the heating and current drive system in ITER, like the use of Lower Hybrid current drive, could overcome these limitations, sustaining higher non-inductive current and confinement, more expanded ITBs which are ideal MHD stable.

  14. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  15. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  16. Could a scheme for licensing smokers work in Australia?

    Science.gov (United States)

    Magnusson, Roger S; Currow, David C

    2013-08-05

    In this article, we evaluate the possible advantages and disadvantages of a licensing scheme that would require adult smokers to verify their right to purchase tobacco products at point of sale using a smart-card licence. A survey of Australian secondary school students conducted in 2011 found that half of 17-2013-old smokers and one-fifth of 12-2013-old smokers believed it was "easy" or "very easy" to purchase cigarettes themselves. Reducing tobacco use by adolescents now is central to the future course of the current epidemic of tobacco-caused disease, since most current adult smokers began to smoke as adolescents--at a time when they were unable to purchase tobacco lawfully. The requirement for cigarette retailers to reconcile all stock purchased from wholesalers against a digital record of retail sales to licensed smokers would create a robust incentive for retailers to comply with laws that prohibit tobacco sales to children. Foreseeable objections to introducing a smokers licence need to be taken into account, but once we move beyond the "shock of the new", it is difficult to identify anything about a smokers licence that is particularly offensive or demeaning. A smoker licensing scheme deserves serious consideration for its potential to dramatically curtail retailers' violation of the law against selling tobacco to minors, to impose stricter accountability for sale of a uniquely harmful drug and to allow intelligent use of information about smokers' purchases to help smokers quit.

  17. High Resolution Modeling of Coastal Inundation: User Requirements and Current Practice, A Navy Perspective

    National Research Council Canada - National Science Library

    Blain, Cheryl Ann; Preller, Ruth H

    2007-01-01

    The impact of coastal flooding and inundation on Navy operational missions and the existing Navy requirements for resolution and accuracy relevant to coastal inundation are presented. High resolution (less than 500 m...

  18. License - Open TG-GATEs | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Open TG-GATEs License License to Use This Database Last updated : 2012/05/24 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  19. License - Budding yeast cDNA sequencing project | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Budding yeast cDNA sequencing project License to Use This Database Last updated : 2010/02/15 You may use this databas...ional License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additiona...n the Standard License. Standard License The Standard License for this database is the license specified in ...the Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  20. License - Yeast Interacting Proteins Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Yeast Interacting Proteins Database License to Use This Database Last updated : 2010/02/15 You may use this database...nal License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additional ...the Standard License. Standard License The Standard License for this database is the license specified in th...e Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  1. Licensing Support Network: An Electronic Discovery System

    International Nuclear Information System (INIS)

    Gil, A. V.; Jensen, D.; McKinnon, B.

    2002-01-01

    The necessary authorization for the U. S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) to submit a License Application (LA) is contingent upon the policy process defined in the Nuclear Waste Policy Act, as amended (NWPA), with some steps yet to occur. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for submittal of an application and to facilitate the U. S. Nuclear Regulatory Commission (NRC) review of this application, if the Yucca Mountain site is recommended and approved for repository development. One of these steps the DOE has taken involves working with the NRC's Advisory Review Panel to develop Licensing Support Network (LSN) requirements and guidelines. The NRC has made a prototype of the LSN web page available at www.LSNNET.gov. The OCRWM part of the LSN currently has an indefinite life cycle and may need to remain in existence until the repository is closed, which could be as long as 325 years

  2. External heating and current drive source requirements towards steady-state operation in ITER

    Science.gov (United States)

    Poli, F. M.; Kessel, C. E.; Bonoli, P. T.; Batchelor, D. B.; Harvey, R. W.; Snyder, P. B.

    2014-07-01

    Steady state scenarios envisaged for ITER aim at optimizing the bootstrap current, while maintaining sufficient confinement and stability to provide the necessary fusion yield. Non-inductive scenarios will need to operate with internal transport barriers (ITBs) in order to reach adequate fusion gain at typical currents of 9 MA. However, the large pressure gradients associated with ITBs in regions of weak or negative magnetic shear can be conducive to ideal MHD instabilities, reducing the no-wall limit. The E × B flow shear from toroidal plasma rotation is expected to be low in ITER, with a major role in the ITB dynamics being played by magnetic geometry. Combinations of heating and current drive (H/CD) sources that sustain reversed magnetic shear profiles throughout the discharge are the focus of this work. Time-dependent transport simulations indicate that a combination of electron cyclotron (EC) and lower hybrid (LH) waves is a promising route towards steady state operation in ITER. The LH forms and sustains expanded barriers and the EC deposition at mid-radius freezes the bootstrap current profile stabilizing the barrier and leading to confinement levels 50% higher than typical H-mode energy confinement times. Using LH spectra with spectrum centred on parallel refractive index of 1.75-1.85, the performance of these plasma scenarios is close to the ITER target of 9 MA non-inductive current, global confinement gain H98 = 1.6 and fusion gain Q = 5.

  3. Current Capabilities, Requirements and a Proposed Strategy for Interdependency Analysis in the UK

    Science.gov (United States)

    Bloomfield, Robin; Chozos, Nick; Salako, Kizito

    The UK government recently commissioned a research study to identify the state-of-the-art in Critical Infrastructure modelling and analysis, and the government/industry requirements for such tools and services. This study (Cetifs) concluded with a strategy aiming to bridge the gaps between the capabilities and requirements, which would establish interdependency analysis as a commercially viable service in the near future. This paper presents the findings of this study that was carried out by CSR, City University London, Adelard LLP, a safety/security consultancy and Cranfield University, defense academy of the UK.

  4. Nuclear licensing and supervision in Germany

    International Nuclear Information System (INIS)

    1996-06-01

    The legal instrument for implementing the licensing and supervisory procedure is specified by statutory ordinances, guidelines and provisions. The licensing requirements for nuclear power plants on the final storage of radioactive wastes in the federal republic of germany are described. The nuclear facilities are subject to continuous state supervision after they have been granted. The appendix gives a brief account of the most important ordinances relating to the AtG and extracts from the Nuclear Safety Convention. (HP)

  5. Improving the Business Trade Licensing Reform Environment

    OpenAIRE

    Gamser, Matthew

    2003-01-01

    This case study of Kenyan business trade licensing shows that red-tape costs can be cut if reform is championed strongly and there is a strong case in terms of costs and benefits. The reform of business registration, trade licensing and other business entry procedures is a cost effective and progressive way to promote indigenous private sector development. But, reform needs more than good cost-benefit analysis and legal drafting; it also requires building constituencies and continuous advocacy.

  6. The acquisition of mechano-electrical transducer current adaptation in auditory hair cells requires myosin VI

    NARCIS (Netherlands)

    Marcotti, Walter; Corns, Laura F.; Goodyear, Richard J.; Rzadzinska, Agnieszka K.; Avraham, Karen B.; Steel, Karen P.; Richardson, Guy P.; Kros, Corne J.

    2016-01-01

    The transduction of sound into electrical signals occurs at the hair bundles atop sensory hair cells in the cochlea, by means of mechanosensitive ion channels, the mechano-electrical transducer (MET) channels. The MET currents decline during steady stimuli; this is termed adaptation and ensures they

  7. A comparative analysis of the domestic and foreign licensing processes for power and non-power reactors

    International Nuclear Information System (INIS)

    Joe, J. C.; Youn, Y. K.; Kim, W. S.; Kim, H. J.

    2003-01-01

    The System-integrated Modular Advanced Reactor (SMART), a small to medium sized integral type Pressurized Water Reactor (PWR) has been developed in Korea. Now, SMART-P, a 1/5 scaled-down of the SMART, is being developed for the purpose of demonstrating the safety and performance of SMART design. The SMART-P is a first-of-a-kind reactor which is utilized for the research and development of a power reactor. Since the licensing process of such a reactor is not clearly specified in the current Atomic Energy Act, a comparative survey and analysis of domestic and foreign licensing processes for power and non-power reactors has been carried out to develop the rationale and technical basis for establishing the licensing process of such a reactor. The domestic and foreign licensing processes of power and non-power reactors have been surveyed and compared, including those of the U.S.A., Japan, France, U.K., Canada, and IAEA. The general trends in nuclear reactor classification, licensing procedures, regulatory technical requirements, and other licensing requirements and regulations have been investigated. The results of this study will be used as the rationale and technical basis for establishing the licensing process of reactors at development stage such as SMART-P

  8. Final Environmental Impact Statement on 10 CFR Part 61 licensing requirements for land disposal of radioactive waste. Summary and main report

    International Nuclear Information System (INIS)

    1982-11-01

    The three-volume final environmental impact statement (FEIS) is prepared to guide and support publication of a final regulation, 10 CFR Part 61, for the land disposal of low-level radioactive waste. The FEIS is prepared in response to public comments received on the draft environmental impact statement (DEIS) on the proposed Part 61 regulation. The DEIS was published in September 1981 as NUREG-0782. Public comments received on the proposed Part 61 regulation separate from the DEIS are also considered in the FEIS. The FEIS is not a rewritten version of the DEIS, which contains an exhaustive and detailed analysis of alternatives, but rather references the DEIS and presents the final decision bases and conclusions (costs and impacts) which are reflected in the Part 61 requirements. Four cases are specifically considered in the FEIS representing the following: past disposal practice, existing disposal practice, Part 61 requirements, and an upper bound example. The Summary and Main Report are contained in Volume 1. Volume 2 consists of Appendices A - Staff Analysis of Public Comments on the DEIS for 10 CFR Part 61, and Appendices B - Staff Analysis of Public Comments on Proposed 10 CFR Part 61 Rulemaking. Volume 3 contains Appendices C-F, entitled as follows: Appendix C - Revisions to Impact Analysis Methodology, Appendix D - Computer Codes Used for FEIS Calculations, Appendix E - Errata for the DEIS for 10 CFR Part 61 and last, Appendix F - Final Rule and Supplementary Information

  9. Microbiological Monitoring for the Constellation Program: Current Requirements and Future Considerations

    Science.gov (United States)

    Ott, C. Mark

    2007-01-01

    Microbiological requirements for spaceflight are based on assessments of infectious disease risk which could impact crew health or mission success. The determination of risk from infectious disease is composed of several factors including (1) crew susceptibility, (2) crew exposure to the infectious disease agent, (3) the concentration of the infectious agent, and (4) the characteristics of the infectious agent. As a result of the Health Stabilization Program, stringent monitoring, and cleaning protocols, in-flight environmental microbial monitoring is not necessary for short-duration spaceflights. However, risk factors change for long-duration missions, as exemplified by the presence of medically significant organisms in the environments of both the Mir and International Space Station (ISS). Based upon this historical evidence, requirements for short duration usage aboard the Orion Crew Exploration Vehicle and Lunar Lander Vehicle will not require in-flight monitoring; however, as mission duration increases with a Lunar Outpost, an ability to detect microbial hazard will be necessary. The nature of the detection requirements will depend on the maturity of technology in a rapidly evolving marketplace. Regardless, the hardware will still need to maximize information to discipline experts and the crew, while minimizing the size, mass, power consumption, and crew time usage. The refinement of these monitors will be a major goal in our efforts to travel successfully to Mars.

  10. 76 FR 82308 - Guidance for Industry: Current Good Tissue Practice and Additional Requirements for Manufacturers...

    Science.gov (United States)

    2011-12-30

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2008-D-0659... that performs a manufacturing step and is responsible for complying with CGTP requirements. The... dated January 2009. DATES: Submit either electronic or written comments on Agency guidances at any time...

  11. License - CREATE portal | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us CREATE portal License License to Use This Database Last updated : 2016/03/16 You may use this database... the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribu...tion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  12. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  13. License - Society Catalog | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Society Catalog License License to Use This Database Last updated : 2012/01/17 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as...is found here . With regard to this database, you are licensed to: freely access part or whole of this database

  14. License - TMFunction | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMFunction License License to Use This Database Last updated : 2017/01/23 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ion-Share Alike 4.0 International is found here . With regard to this database, you are licensed to: freely

  15. Why operators fail licensing examinations

    International Nuclear Information System (INIS)

    Roth, D.R.; Zerbo, J.N.

    1975-01-01

    A survey was conducted among nuclear utility operators who have taken NRC licensing examinations to determine which factors they considered important in their success or failure. The operators also compared the actual NRC examination with their expectations prior to taking the examination. The results of the survey supplement NRC statistics with regard to failure rates. Over 350 operators and 20 utilities participated in the survey and a good cross section of the nuclear community is represented. Reactor theory and emergency procedures are important areas in which operators found NRC emphasis to be different than expected. Observation Training and Design Lecture Series are two training segments which appear to require improvement. Recommendations are made for the use of data collected through this survey and for continuation of the effort to give operators a mechanism of supplying feedback to the training and licensing process

  16. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  17. Understanding Licensing Behavior

    DEFF Research Database (Denmark)

    Cabaleiro, Goretti; Moreira, Solon; Reichstein, Toke

    The potential for rent dissipation has been argued to be the main cause of firms? licensing out behavior being stifled.However, this aspect has been scarcely studied empirically. We draw on rent dissipation arguments, and hypothesize that firms suffering from the not-invented-here (NIH) syndrome......, firms in competitive product markets, and firms that have incurred substantial sunk cost are associated with lower rates of technology out-licensing. We also posit that sunk costs negatively moderate the relationship between competition in the licensor?s product market, and licensing rate. We test our...

  18. Licensing of advanced reactors: Status report and perspective

    International Nuclear Information System (INIS)

    King, T.

    1988-01-01

    In July, 1986, the U.S. Nuclear Regulatory Commission issued a Policy State on the Regulation of Advanced Nuclear Power Plants. As part of this policy, advanced reactor designers were encouraged to interact with NRC [Nuclear Regulatory Commission] early in the design process to obtain feedback regarding licensing requirements for advanced reactors. Accordingly, the staff has been interacting with the Department of Energy (DOE) and its contractors on the review of three advanced reactor conceptual designs: one modular high temperature gas-cooled reactor (MHTGR) and two liquid metal reactors (LMRs). This paper provides a status of the NRC review effort, describes the key policy and technical issues resulting from our review and provides the current status and approach to the development of licensing guidance on each

  19. Current Mobile Payment Procedures on the German Market from the View of Customer Requirements

    OpenAIRE

    Pousttchi, Key; Zenker, M.

    2003-01-01

    The key to mobile payment acceptance is in the hands of customers. In this paper we use the results of the mobile payment survey MP1 in order to identify and roughly weigh the most relevant acceptance criteria. The outcome of the paper is an evaluation scheme containing the covered payment scenarios, important main criteria (security, costs and convenience) and additional functionality requirements for each MP procedure. The scheme is based on empirical results and can assess a given MP proce...

  20. Current issues in determining dietary protein and amino-acid requirements

    DEFF Research Database (Denmark)

    Pencharz, P; Jahoor, F; Kurpad, A

    2014-01-01

    Pregnancy and the first two years of life are periods of rapid growth and yet the knowledge of requirements for protein and dietary indispensable amino acids is very limited. The development of carbon oxidation methods opens the way to studies that should fill these important gaps in knowledge.Eu.......European Journal of Clinical Nutrition advance online publication, 15 January 2014; doi:10.1038/ejcn.2013.297....

  1. Exemption from licensing requirements for spark-gap irradiators that contain cobalt-60: (Docket No. PRM 30-54): Draft environmental statement

    International Nuclear Information System (INIS)

    1975-09-01

    This Draft Statement on environmental considerations associated with the proposed exemption of cobalt-60 in spark-gap irradiators was prepared by the US Nuclear Regulatory Commission, Office of Standards Development (the staff), in accordance with the Commission's regulation 10 CFR Part 51, which implements the requirements of the National Environmental Policy Act of 1969 (NEPA). The NEPA states, among other things, that the federal government has the continuing responsibility to use all practicable means, consistent with other essential considerations of national policy, to improve and to coordinate federal plans, functions, programs, and resources to the end that the nation may: fulfill the responsibilities of each generation as trustee of the environment for succeeding generations; assure for all Americans safe, healthful, productive, and esthetically and culturally pleasing surroundings; attain the widest range of beneficial uses of the environment without degradation, risk to health or safety, or other undesirable and unintended consequences; preserve important historic, cultural, and natural aspects of our national heritage, and maintain, wherever possible, an environment which supports diversity and variety of individual choice; achieve a balance between population and resource use which will permit high standards of living and a wide sharing of life's amenities; and enhance the quality of renewable resources and approach the maximum attainable recycling of depletable resources. 42 refs., 5 figs., 7 tabs

  2. Hypoxic augmentation of Ca2+ channel currents requires a functional electron transport chain.

    Science.gov (United States)

    Brown, Stephen T; Scragg, Jason L; Boyle, John P; Hudasek, Kristin; Peers, Chris; Fearon, Ian M

    2005-06-10

    The incidence of Alzheimer disease is increased following ischemic episodes, and we previously demonstrated that following chronic hypoxia (CH), amyloid beta (Abeta) peptide-mediated increases in voltage-gated L-type Ca(2+) channel activity contribute to the Ca(2+) dyshomeostasis seen in Alzheimer disease. Because in certain cell types mitochondria are responsible for detecting altered O(2) levels we examined the role of mitochondrial oxidant production in the regulation of recombinant Ca(2+) channel alpha(1C) subunits during CH and exposure to Abeta-(1-40). In wild-type (rho(+)) HEK 293 cells expressing recombinant L-type alpha(1C) subunits, Ca(2+) currents were enhanced by prolonged (24 h) exposure to either CH (6% O(2)) or Abeta-(1-40) (50 nm). By contrast the response to CH was absent in rho(0) cells in which the mitochondrial electron transport chain (ETC) was depleted following long term treatment with ethidium bromide or in rho(+) cells cultured in the presence of 1 microm rotenone. CH was mimicked in rho(0) cells by the exogenous production of O2(-.). by xanthine/xanthine oxidase. Furthermore Abeta-(1-40) enhanced currents in rho(0) cells to a degree similar to that seen in cells with an intact ETC. The antioxidants ascorbate (200 microm) and Trolox (500 microm) ablated the effect of CH in rho(+) cells but were without effect on Abeta-(1-40)-mediated augmentation of Ca(2+) current in rho(0) cells. Thus oxidant production in the mitochondrial ETC is a critical factor, acting upstream of amyloid beta peptide production in the up-regulation of Ca(2+) channels in response to CH.

  3. Market perspectives of H2 vehicles. Analysis of current status and requirements

    International Nuclear Information System (INIS)

    Bunzeck, I.G.

    2009-06-01

    This report serves as discussion document for the workshop 'Technologies for fuel cells and hydrogen in road transport' in Paris, France, March 2009. The workshop is part of the Efonet (Energy Foresight Network, www.efonet.org ) program initiated by the European Commission. As a starting point, the status quo of fuel cell technology is analyzed from an innovation perspective, compared with the current vehicle deployment in demonstration projects worldwide. Then, cost reductions of fuel cell and drive train components that can be achieved as function over time are modelled in a learning curve approach. This provides a forecast on the expected vehicle cost by cumulative production, enabling discussion on the connection between necessary vehicle deployment and current demonstration projects, also in respect to project finance. Within the EU HyWays project, four scenarios have been developed to model the penetration rates for hydrogen vehicles in transport. All scenarios are determined by two influencing factors, policy support and level of technological learning. Depending on the scenario, it is assumed that mass production of vehicles starts either by 2013 (2016) with a group of 5 (4) first movers that achieve up to 90% plant utilization in different time frames. Given the bandwidth of scenario results, it is possible to redefine cost targets and provide recommendations for the necessary policy support. The report also provides an assessment of current hydrogen vehicle RD and D activities by different OEMs and gives an indication on the expected market entry strategies and time frame. To conclude, cost of conventional and hydrogen vehicles are compared on a euro/km level, testing several policy measures for their suitability to lower the expected high vehicle cost for the end-consumer.

  4. Current drive efficiency requirements for an attractive steady-state reactor

    Energy Technology Data Exchange (ETDEWEB)

    Tonon, G

    1994-12-31

    The expected values of the figure of merit and the electrical efficiency of various non-inductive current drive methods are considered. The main experimental results achieved today with neutral beams and radiofrequency systems are summarized. Taking into account the simplified energy flow diagram of a steady state reactor, the figure of merit and the electrical efficiency values which are necessary in order to envisage an attractive steady-state reactor are determined. These values are compared to the theoretical predictions. (author). 16 refs., 11 figs., 2 tabs.

  5. Current drive efficiency requirements for an attractive steady-state reactor

    International Nuclear Information System (INIS)

    Tonon, G.

    1994-01-01

    The expected values of the figure of merit and the electrical efficiency of various non-inductive current drive methods are considered. The main experimental results achieved today with neutral beams and radiofrequency systems are summarized. Taking into account the simplified energy flow diagram of a steady state reactor, the figure of merit and the electrical efficiency values which are necessary in order to envisage an attractive steady-state reactor are determined. These values are compared to the theoretical predictions. (author). 16 refs., 11 figs., 2 tabs

  6. Credentialing, Licensing, and Education

    Science.gov (United States)

    ... V W X Y Z Credentialing, Licensing, and Education Share: On This Page The Bottom Line Credentials, ... and practices that chiropractors are allowed to perform. Education and Training Professional organizations in some complementary health ...

  7. License to build

    International Nuclear Information System (INIS)

    Huntelaar, Mark; Vos, Renate de; Roobol, Lars

    2007-01-01

    Full text: A new license under the nuclear power act is applied for at the Dutch Government for the building of a High Active Repackaging Unit (HAVA-VU in Dutch) at NRG in Petten, The Netherlands. This new building is necessary to comply with our nuclear license to dispose of high active nuclear waste at Petten to the intermediate storage facility (COVRA). In the first part of this paper attention is given to the formal procedure followed by the Government, what type of documents are to be submitted, what time frames are followed, how citizen participation is organized, and as final result a new license. In the second part more detailed information is given about the present license renewal needed for the High Active Repackaging Unit

  8. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  9. The state of the systems of information in the companies prioritized according to the current requirementstized according to the current requirements

    Directory of Open Access Journals (Sweden)

    Grisel Castillo Almeida

    2017-04-01

    Full Text Available The necessity to maintain efficient systems of information in the prioritized companies of the territory of Pinar del Rio, Cuba, took us to carry out a diagnosis to determine the current state of the same ones and to propose group actions that congratulate the taking of decisions and the identification of the useful flows of information, to favor the organizational acting. The results of the study evidenced among other that alone 12% has an organized system of information and implemented according to the current requirements, what indicates that 88% is wasting the opportunities that offer the systems of information, also stands out the necessity to implement good practices to assure the security of the information according to the effective norms. The execution of a group of activities was approved to rise in first term the efficiency of the informative system of the study sample, with a view to continuing deepening toward the managerial intelligence.

  10. Review of current practices and requirements for the inspection of prestressed concrete pressure vessels

    International Nuclear Information System (INIS)

    Reimann, K.J.

    1980-12-01

    Code requirements for pre- and in-service inspection of prestressed concrete pressure vessels as utilized in gas-cooled reactors are reviewed and compared with practices and experiences during construction, commissioning, and operation of such reactors. The pre-service inspection relies heavily on embedded instrumentation for measurements of stresses, temperatures, and displacements. The same instrumentation is later used for in-service surveillance, which additionally includes visual examination of exposed surfaces, monitoring of tendon conditions, and measurement of tendon loads. Improvement of present monitoring instrumentation and/or techniques, rather than development of new in-service inspection methods, is recommended

  11. Nuclear facilities licensing

    International Nuclear Information System (INIS)

    Carvalho, A.J.M. de.

    1978-01-01

    The need for the adoption of a legal and normative system, defining objectives, pescriptions and the process of nuclear licensing and building of nuclear power plants in Brazil is enphasized. General rules for the development of this system are presented. The Brazilian rules on the matter are discussed. A general view of the German legal system for nuclear power plant licensing and the IAEA recommendations on the subject are finally presented. (A.L.S.L.) [pt

  12. Current challenges for radiographers and following changes in the education and the qualification requirements

    International Nuclear Information System (INIS)

    Taneva, E.; Gagova, E.

    2006-01-01

    Full text: The communication is intended to present the new requisites for the activity of the X-ray laboratory assistant, laying changes in the educational background and the qualification of the respective medical specialists. The need of new knowledge and skills lead to changes in the competence of the X-ray laboratory assistants and call for urgent measures for updating the curriculum, programmes and exercises. The implementation of new technologies in the profession requires an education of new quality that complies with the needs of the health care in the country and harmonizing it with the requirements of the European Union. Having made an analysis of the education so far and comparing its condition with that of the leading European countries we came to the conclusion that not only the contents of the education should be changed, but also the teaching hours and the qualification of the X-ray laboratory assistants. Knowing the new realities and challenges in the health care system, the professors of the medical colleges and the health specialists are aware of the need to introduce changes in the medical practice and work together for its implementation

  13. THE DUAL CONTROL – A REQUIREMENT OF THE CURRENT BANK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    ALINA MATIȘ

    2014-10-01

    Full Text Available Security is a major problem of the banking industry, which bases its whole system on the reputation the bank manages to establish and then maintain among its customers. With the manifestation of information security issues and in interdependence with them, the need for internal control also developed, both of them being associated with modern risk management practices. As the concept of internal control has been rising as a major concern of management and corporate governance, there are attempts to classify it and distinguish it in different categories, dual control being a result of this process. The authors of this study attempt to present the concept of dual control as it is currently applied in the banking system, trying to analyze contextually its capacities of fraud detection, its consequences in terms of risk and costs as well as its effects on bank performance.

  14. Fuel for ADS: State-of-the-art, requirements, current and future programmes

    International Nuclear Information System (INIS)

    Gabrielli, F.

    2015-01-01

    Fuels are the cornerstone of research/development programs of accelerator-driven systems for transmuting minor actinides (MA). Compared with the fuels for critical reactors, fuels for ADS are generally U-free to improve the transmutation performance and contain high volumetric concentrations (about 50%) of MA and Pu compounds. Their specific fabrication, reprocessing, design and safety issues are being currently investigated. This paper provides an overview of the current state-of-the-art of the assessment of these innovative fuels. Emphasis has been placed on the main outcomes of the work performed within the Sixth FP EU EUROTRANS Programme, which provided a decisive step forward in improving knowledge on fabrication, properties, and behaviour under irradiation of these challenging fuels. In EUROTRANS, for the ADS application, the focus was on Ceramic-Ceramic (Pu,MA)O 2 + MgO and Ceramic-Metallic (Pu,MA)O 2 + 92 Mo composite fuels, which were recommended for the European Facility for Industrial Transmutation (EFIT). The fuels consist of particles of (Pu,MA)O 2 phases dispersed in a magnesia or molybdenum matrix. Solid nitride (Pu,MA,Zr)O 2 fuels have also been considered as a back-up solution. This paper presents the main experimental results from out-of-pile and in-pile experiments of the Ceramic-Ceramic and Ceramic-Metallic composite fuels as well as related safety assessments. Further, the on-going research and development activities on fuels loaded with large amount of MA will be presented. (author)

  15. Licensing of HTGRs in the United States

    International Nuclear Information System (INIS)

    Fisher, C.R.; Orvis, D.D.

    1981-01-01

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented. (author)

  16. Licensing of HTGRs in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, C. R.; Orvis, D. D. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented.

  17. Current radiation protection requirements governing the use of radioactive sources for medical purposes

    International Nuclear Information System (INIS)

    Dumenigo Gonzalez, Cruz; De la Fuente Punch, Andres; Quevedo Garcia, Jose; Diaz Guerra, Pedro; Lopez Forteza, Yamil

    2004-01-01

    With the recent endorsement of the Regulations Basic Standard for Radiological Safety, and the Guides For the implementation of the Safety Regulations in the Practice of the Radiotherapy and For the implementation of the Safety Regulations in the Practice of the Nuclear Medicine, the basic regulatory framework for the conduction of these two practices in the Republic of Cuba has been completed. Principles of these regulations are in total agreement with the recommendations of the International Atomic Energy Agency and the World Health Organization. To the purpose of establishing the police that rules the implementation of this new Regulations, the Regulatory Authority (CNSN), carried out an evaluation of the achievability of the requirements included. The present paper shows the results of the evaluation of the Safety carried out for the users' institutions in the light of the new Regulations. Such evaluation was based in the analysis of the documentation submitted by users when applying for Licence, as well as on the results of the periodic inspections conducted by the Regulatory Authority. The authors of this paper developed a methodology for identifying the non correspondences with the requirements in the regulation prevailing in each one of the users' institutions. Categorizing the non correspondences as function of its importance for the safety, the methodology makes it possible to establish a prioritization order in resolving such n on correspondence , and the optimization of the existing limited resources in the country can be achieved. Authors of this paper considered that in spite of the non correspondence identified, the safety in the development of the practice is not compromised

  18. Balancing functional and nutritional quality of oils and fats: Current requirements and future trends

    Directory of Open Access Journals (Sweden)

    Van den Bremt Karen

    2012-03-01

    Full Text Available Oils and fats play an important role in the structure, aroma and stability of a wide variety of food products, as well as in their nutritional properties. For Puratos, a producer of ingredients for bakery, patisserie and chocolate sector, functionality and taste are of utmost importance, but the company also wants to contribute to the balanced diet of consumers. Vegetable oils and fats are used in margarines and releasing agents, vegetable creams, compound chocolate, fillings and emulsifiers. Each application requires an oil or fat with specific physicochemical properties in order to ensure the optimal structure, stability and taste of the end product. Traditionally, (partially hydrogenated vegetable oils deliver important functional characteristics concerning crystallization behaviour, directly linked with the workability, melting properties, stability and mouth feel of the food product. However, due to negative nutritional implications, trans fats are to be replaced by healthier alternatives, preferably not by saturated fats. Consumers – and in some regions, legal instances – demand transfree or hydro-free products while not compromising on taste. Alternative fats and oils will be discussed concerning their functional and nutritional properties.

  19. NPP long term operation in Spain - First application for license renewal

    International Nuclear Information System (INIS)

    Francia, L.; Gorrochategui, I.; Marcos, R.

    2007-01-01

    Full text: In the operation of the Spanish nuclear power plants (NPP), safety is always the prime consideration. Plant Life Management Programmes have been set up with the strategic objective to operate the NPPs as long as they are considered safe and reliable. The safety of each NPP is reviewed by the Spanish nuclear regulatory authority (CSN) under a continuous process. In addition, experience is gained from operating the plants and from exchanges with operators of similar units. Current Spanish regulatory framework for renewing NPP operating licenses requires performing a Periodic Safety Review (PSR) to be performed every 10 years and submitted when applying for a new renewal of the NPP operating license. A few years ago, CSN issued a document regarding the licensing requirements that nuclear power plants should meet in order to be granted with an operating license for long term operation (i.e, operation beyond the original plant design life, typically 40 years). Besides the traditional PSR requirements, specific requirements regarding to long term operation (LTO) include: - An Aging Management and Evaluation Program, including the identification and evaluation of Time Limited Aging Analysis (TLAA). - An updated Radiological Impact Study. - A review and assessment of regulation/standard applicability. Garona NPP (GE, BWR/3 design) operated by Spanish utility Nuclenor from 1971 has a current operating license up to 2009. A decision was made to apply for a new operating license, being Garona plant the first one in Spain to face with the new long term operation requirements. The paper will provide an overview of the methodology used in Spain to address and perform the required analyses to support the LTO application for the operating license renewal. In particular, focus will be paid on the project developed in Garona (2002-2006) whose result has been the first Spanish application for License Renewal for LTO. Also it will be reported the ongoing work necessary to

  20. Assessing thermochromatography as a separation method for nuclear forensics. Current capability vis-a-vis forensic requirements

    International Nuclear Information System (INIS)

    Hanson, D.E.; Garrison, J.R.; Hall, H.L.

    2011-01-01

    Nuclear forensic science has become increasingly important for global nuclear security. However, many current laboratory analysis techniques are based on methods developed without the imperative for timely analysis that underlies the post-detonation forensics mission requirements. Current analysis of actinides, fission products, and fuel-specific materials requires time-consuming chemical separation coupled with nuclear counting or mass spectrometry. High-temperature gas-phase separations have been used in the past for the rapid separation of newly created elements/isotopes and as a basis for chemical classification of that element. We are assessing the utility of this method for rapid separation in the gas-phase to accelerate the separations of radioisotopes germane to post-detonation nuclear forensic investigations. The existing state of the art for thermo chromatographic separations, and its applicability to nuclear forensics, will be reviewed. (author)

  1. Initiatives in transport cask licensing

    International Nuclear Information System (INIS)

    Patterson, John

    1998-01-01

    The variations in research reactor fuel form, configuration, irradiation characteristics, and transport cask have required a substantial number of transport cask licensing actions associated with foreign research reactor spent fuel transportation. When compounded by limited time for shipment preparations, due to contract timing or delayed receipt of technical data, the number and timing of certifications has adversely impacted the ability of regulatory agencies to support intended shipping schedules. This issue was brought into focus at a april, 1998 meeting among DOE, the US Nuclear Regulatory Commission, and DOE's spent fuel transportation contractors. (author)

  2. License - AcEST | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us AcEST License to Use This Database Last updated : 2010/02/15 You may use this database in co...he Standard License specifies the license terms regarding the use of this database and the requirements you ...must follow in using this database. The Additional License specifies those items ... License The Standard License for this database is the license specified in the Creative Commons Attribution...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  3. License - Dicty_cDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Dicty_cDB License to Use This Database Last updated : 2010/02/15 You may use this database i...w. The Standard License specifies the license terms regarding the use of this database and the requirements ...you must follow in using this database. The Additional License specifies those it...dard License The Standard License for this database is the license specified in the Creative Commons Attribu...tion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  4. Benchmark for license plate character segmentation

    Science.gov (United States)

    Gonçalves, Gabriel Resende; da Silva, Sirlene Pio Gomes; Menotti, David; Shwartz, William Robson

    2016-09-01

    Automatic license plate recognition (ALPR) has been the focus of many researches in the past years. In general, ALPR is divided into the following problems: detection of on-track vehicles, license plate detection, segmentation of license plate characters, and optical character recognition (OCR). Even though commercial solutions are available for controlled acquisition conditions, e.g., the entrance of a parking lot, ALPR is still an open problem when dealing with data acquired from uncontrolled environments, such as roads and highways when relying only on imaging sensors. Due to the multiple orientations and scales of the license plates captured by the camera, a very challenging task of the ALPR is the license plate character segmentation (LPCS) step, because its effectiveness is required to be (near) optimal to achieve a high recognition rate by the OCR. To tackle the LPCS problem, this work proposes a benchmark composed of a dataset designed to focus specifically on the character segmentation step of the ALPR within an evaluation protocol. Furthermore, we propose the Jaccard-centroid coefficient, an evaluation measure more suitable than the Jaccard coefficient regarding the location of the bounding box within the ground-truth annotation. The dataset is composed of 2000 Brazilian license plates consisting of 14000 alphanumeric symbols and their corresponding bounding box annotations. We also present a straightforward approach to perform LPCS efficiently. Finally, we provide an experimental evaluation for the dataset based on five LPCS approaches and demonstrate the importance of character segmentation for achieving an accurate OCR.

  5. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  6. An overview of the licensing approach of the South African nuclear regulatory authority

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Hill, T.F.; Henderson, N.R.; Keenan, N.H.; Metcalf, P.E.; Mysenkov, A.

    1997-01-01

    This paper describes the approach adopted by the South African Nuclear Regulatory Authority, the Council for Nuclear Safety (CNS) in licensing nuclear installations in South Africa. An introduction to the current South African legislation and the CNS philosophy pertaining to the licensing of nuclear installations is discussed. A typical process for granting a nuclear licence is then presented. The risk assessment process, which is used to verify compliance with the fundamental safety standards and to establish licensing requirements for a specific nuclear installation, is discussed. Based on the outcome of this assessment process, conditions of licence are set down. The generic content of a nuclear licence and mechanisms to ensure ongoing compliance with the risk criteria are presented. The regulatory process discussed in this paper, based on such a fundamental approach, may be adapted to any type of nuclear installation taking into account plant specific designs and characteristics. (author)

  7. Integration of MGDS design into the licensing process

    International Nuclear Information System (INIS)

    1997-12-01

    This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the licensing process. The integration process employs a two-told approach: (1) ensure that the MGDS design complies with applicable Nuclear Regulatory Commission (NRC) licensing requirements, and (2) ensure that the MGDS design is appropriately reflected in a license application that is acceptable to the NRC for performing acceptance and compliance reviews

  8. Methodology and findings of the NRC's materials licensing process redesign

    International Nuclear Information System (INIS)

    Rathbun, P.A.; Brown, K.D.; Madera, J.R.; Moriarty, M.; Pelchat, J.M.; Usilton, W.K.; Whitten, J.E.; Vacca, P.C.

    1996-04-01

    This report describes the work and vision of the team chartered to redesign the process for licensing users of nuclear materials. The Business Process Redesign team was chartered to improve the speed of the existing licensing process while maintaining or improving public safety and to achieve required resource levels. The report describes the team's methods for acquiring and analyzing information about the existing materials licensing process and the steps necessary to radically change this process to the envisioned future process

  9. Atomic Safety and Licensing Board Panel annual report

    International Nuclear Information System (INIS)

    1991-09-01

    In Fiscal Year 1990, The Atomic Safety and Licensing Board Panel (Panel) handled 40 proceedings involving the construction, operation, and maintenance of commercial nuclear power reactors or other activities requiring a license from the Nuclear Regulatory Commission. This report summarizes, highlights, and analyzes how the judges and licensing boards of the Panel addressed the wide-ranging issues raised in these proceedings during the year

  10. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  11. 19 CFR 147.24 - Merchandise subject to licensing.

    Science.gov (United States)

    2010-04-01

    ... the U.S. Government, may be entered for a fair only upon the presentation of the required license, or... OF THE TREASURY (CONTINUED) TRADE FAIRS Requirements of Other Laws § 147.24 Merchandise subject to...

  12. Licensing in an international triopoly

    Science.gov (United States)

    Ferreira, Fernanda A.; Ferreira, Flávio

    2011-12-01

    We study the effects of entry of two foreign firms on domestic welfare in the presence of licensing, when the incumbent is technologically superior to the entrants. We consider two different situations: (i) the cost-reducing innovation is licensed to both entrants; (ii) the cost-reducing innovation is licensed to just one of the entrants. We analyse three kind of license: (lump-sum) fixed-fee; (per-unit) royalty; and two-part tariff, that is a combination of a fixed-fee and a royalty. We prove that a two part tariff is never an optimal licensing scheme for the incumbent. Moreover, (i) when the technology is licensed to the two entrants, the optimal contract consists of a licensing with only output royalty; and (ii) when the technology is licensed to just one of the entrants, the optimal contract consists of a licensing with only a fixed-fee.

  13. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions

    Science.gov (United States)

    Ponzio, Todd A.; Feindt, Hans; Ferguson, Steven

    2011-01-01

    monitor the licensee’s diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind. This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH’s exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic

  14. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions.

    Science.gov (United States)

    Ponzio, Todd A; Feindt, Hans; Ferguson, Steven

    2011-09-01

    the licensee's diligence and progress; most exclusive licenses include a commercial development plan, with penalties, financial or even revocation of the license, if the plan is not followed, e.g., the license falls too far behind.This study examines whether developmental milestone schedules based on a small molecule drug development model are useful and realistic in setting expectations for biopharmaceutical product development. We reviewed the monitoring records of all exclusive Public Health Service (PHS) commercial development license agreements for small molecule drugs or therapeutics based on biotechnology (biopharmaceuticals) executed by the National Institutes of Health (NIH) Office of Technology Transfer (OTT) between 2003 and 2009. We found that most biopharmaceutical development license agreements required amending because developmental milestones in the negotiated schedule could not be met by the licensee. This was in stark contrast with license agreements for small molecule chemical compounds which rarely needed changes to their developmental milestone schedules. As commercial development licenses for biopharmaceuticals make up the vast majority of NIH's exclusive license agreements, there is clearly a need to: 1) more closely examine how these benchmark schedules are formed, 2) try to understand the particular risk factors contributing to benchmark schedule non-compliance, and 3) devise alternatives to the current license benchmark schedule structural model. Schedules that properly weigh the most relevant risk factors such as technology classification (e.g., vaccine vs recombinant antibody vs gene therapy), likelihood of unforeseen regulatory issues, and company size/structure may help assure compliance with original license benchmark schedules. This understanding, coupled with a modified approach to the license negotiation process that makes use of a clear and comprehensive term sheet to minimize ambiguities should result in a more realistic benchmark

  15. Challenges in licensing a sodium-cooled advanced recycling reactor

    International Nuclear Information System (INIS)

    Levin, Alan E.

    2008-01-01

    As part of the Global Nuclear Energy Partnership (GNEP), the U.S. Department of Energy (DOE) has focused on the use of sodium-cooled fast reactors (SFRs) for the destruction of minor actinides derived from used reactor fuel. This approach engenders an array of challenges with respect to the licensing of the reactor: the U.S. Nuclear Regulatory Commission (NRC) has never completed the review of an application for an operating license for a sodium-cooled reactor. Moreover, the current U.S. regulatory structure has been developed to deal almost exclusively with light-water reactor (LWR) designs. Consequently, the NRC must either (1) develop a new regulatory process for SFRs, or (2) reinterpret the existing regulations to apply them, as appropriate, to SFR designs. During the 1980s and 1990s, the NRC conducted preliminary safety assessments of the Sodium Advanced Fast Reactor (SAFR) and the Power Reactor Innovative Small Module (PRISM) designs, and in that context, began to consider how to apply LWR-based regulations to SFR designs. This paper builds on that work to consider the challenges, from the reactor designer's point of view, associated with licensing an SFR today, considering (1) the evolution of SFR designs, (2) the particular requirements of reactor designs to meet GNEP objectives, and (3) the evolution of NRC regulations since the conclusion of the SAFR and PRISM reviews. (author)

  16. Multi-Stage ADRs for Current and Future Astronomy Missions: Performance and Requirements for Cryogen-Free Operation

    Science.gov (United States)

    Shirron, Peter; Kimball, Mark; Vlahacos, Kosta

    2010-01-01

    The cooling requirements for current (e.g. Astro-H) and future (e.g. IXO and ASP) astronomy missions pose significant challenges for the sub-Kelvin Cooler. In particular, the use of large detector arrays increases the cooling power needed, and the variety of cryocoolers that can be used for pre-cooling greatly expands the range of temperatures at which the sub-Kelvin cooler can be designed to reject heat. In most cases, there is also a need for a stable higher temperature stage for cooling amplifiers or telescope components. NASA/GSFC is currently building a 3-stage ADR for the Astro-H mission, and is developing a 5-stage ADR suitable for IXO and ASP, as well as many other missions in the early planning stages. The architecture of these ADRs allows them to be adapted rather easily for different cooling requirements and to accommodate different cryocooler capabilities (operating temperature and cooling power). This paper will discuss the performance of these ADRs, which operate in both continuous, and single-shot cooling modes, and the minimum cryocooler capabilities needed to meet the requirements of future missions.

  17. Licensing the Sun

    Science.gov (United States)

    Demski, Jennifer

    2013-01-01

    The University of San Diego (USD) and Point Loma Nazarene University (PLNU) are licensing the sun. Both California schools are generating solar power on campus without having to sink large amounts of capital into equipment and installation. By negotiating power purchasing agreements (PPAs) with Amsolar and Perpetual Energy Systems, respectively,…

  18. Future of nuclear licensing

    International Nuclear Information System (INIS)

    Denton, H.R.

    1984-01-01

    The following topics are outlined: Comparison of US and best foreign experience in nuclear power plant construction and operation; Status of licensing and construction; Observed attributes; Reduced construction time; Fewer reactor trips; Higher capacity factor; Diesel generator reliability; Steam generator tube leakage; and US regulatory initiatives: NRC efforts and industry efforts

  19. A fresh look at electron cyclotron current drive power requirements for stabilization of tearing modes in ITER

    Energy Technology Data Exchange (ETDEWEB)

    La Haye, R. J., E-mail: lahaye@fusion.gat.com [General Atomics, P.O. Box 85608, San Diego, California 92186-5608 (United States)

    2015-12-10

    ITER is an international project to design and build an experimental fusion reactor based on the “tokamak” concept. ITER relies upon localized electron cyclotron current drive (ECCD) at the rational safety factor q=2 to suppress or stabilize the expected poloidal mode m=2, toroidal mode n=1 neoclassical tearing mode (NTM) islands. Such islands if unmitigated degrade energy confinement, lock to the resistive wall (stop rotating), cause loss of “H-mode” and induce disruption. The International Tokamak Physics Activity (ITPA) on MHD, Disruptions and Magnetic Control joint experiment group MDC-8 on Current Drive Prevention/Stabilization of Neoclassical Tearing Modes started in 2005, after which assessments were made for the requirements for ECCD needed in ITER, particularly that of rf power and alignment on q=2 [1]. Narrow well-aligned rf current parallel to and of order of one percent of the total plasma current is needed to replace the “missing” current in the island O-points and heal or preempt (avoid destabilization by applying ECCD on q=2 in absence of the mode) the island [2-4]. This paper updates the advances in ECCD stabilization on NTMs learned in DIII-D experiments and modeling during the last 5 to 10 years as applies to stabilization by localized ECCD of tearing modes in ITER. This includes the ECCD (inside the q=1 radius) stabilization of the NTM “seeding” instability known as sawteeth (m/n=1/1) [5]. Recent measurements in DIII-D show that the ITER-similar current profile is classically unstable, curvature stabilization must not be neglected, and the small island width stabilization effect from helical ion polarization currents is stronger than was previously thought [6]. The consequences of updated assumptions in ITER modeling of the minimum well-aligned ECCD power needed are all-in-all favorable (and well-within the ITER 24 gyrotron capability) when all effects are included. However, a “wild card” may be broadening of the localized

  20. ISO and software quality assurance - licensing and certification of software professionals

    Energy Technology Data Exchange (ETDEWEB)

    Hare, J.; Rodin, L.

    1997-11-01

    This report contains viewgraphs on licensing and certifing of software professionals. Discussed in this report are: certification programs; licensing programs; why became certified; certification as a condition of empolyment; certification requirements; and examination structures.

  1. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  2. License - Taxonomy Icon | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Taxonomy Icon License License to Use This Database Last updated : 2013/3/21 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion 2.1 Japan . If you use data from this database, please be sure attribute this database as follows: Taxon...ative Commons Attribution 2.1 Japan is found here . With regard to this database,

  3. License - PLACE | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us PLACE License License to Use This Database Last updated : 2014/07/17 You may use this database...ense terms regarding the use of this database and the requirements you must follow in using this database. The license for this datab...re Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follows: ... ...re . With regard to this database, you are licensed to: freely access part or whole of this database, and ac...quire data; freely redistribute part or whole of the data from this database; and freely create and distribute database

  4. License - RGP caps | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP caps License License to Use This Database Last updated : 2015/05/12 You may use this database...license terms regarding the use of this database and the requirements you must follow in using this database...Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as follow...ommons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, you are licensed to: ...freely access part or whole of this database, and acquire data; freely redistribute part or whole of the data from this database

  5. License - RMG | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RMG License License to Use This Database Last updated : 2013/08/07 You may use this database...se terms regarding the use of this database and the requirements you must follow in using this database. The license for this databas... Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follows: Ric...Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this database..., and acquire data; freely redistribute part or whole of the data from this database; and freely create and distribute datab

  6. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. License - Metabolonote | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Metabolonote License License to Use This Database Last updated : 2016/06/22 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...e Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  8. License - RGP physicalmap | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP physicalmap License License to Use This Database Last updated : 2015/07/07 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as...ry of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, y

  9. A meta-analytic review of moral licensing.

    Science.gov (United States)

    Blanken, Irene; van de Ven, Niels; Zeelenberg, Marcel

    2015-04-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397 participants) that compare a licensing condition with a control condition. Based on this analysis, the magnitude of the moral licensing effect is estimated to be a Cohen's d of 0.31. We tested potential moderators and found that published studies tend to have larger moral licensing effects than unpublished studies. We found no empirical evidence for other moderators that were theorized to be of importance. The effect size estimate implies that studies require many more participants to draw solid conclusions about moral licensing and its possible moderators. © 2015 by the Society for Personality and Social Psychology, Inc.

  10. 31 CFR 596.309 - Specific license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.309 Specific license. The term specific license means any license or...

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  12. Effective Continuing Education for Licensed Real Estate Professionals

    Science.gov (United States)

    Tilton, Wendy A.

    2004-01-01

    Mandatory real estate education has been intensely debated for many years. New Jersey is the only state in the nation that does not require licensed real estate agents to attend an ongoing educational event after securing a license to practice. A bill was proposed to the legislature to mandate real estate education in June of 2001. (It was…

  13. 48 CFR 1852.225-70 - Export Licenses.

    Science.gov (United States)

    2010-10-01

    ... writing, that the Contracting Officer authorizes it to export ITAR-controlled technical data (including... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Contractor shall be responsible for obtaining export licenses, if...

  14. 47 CFR 25.113 - Station licenses and launch authority.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Station licenses and launch authority. 25.113 Section 25.113 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.113 Station...

  15. 47 CFR 25.117 - Modification of station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Modification of station license. 25.117 Section 25.117 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.117...

  16. 45 CFR 1321.75 - Licenses and safety.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Licenses and safety. 1321.75 Section 1321.75... AND COMMUNITY PROGRAMS ON AGING Service Requirements § 1321.75 Licenses and safety. The State shall... that the facility complies with all applicable State and local health, fire, safety, building, zoning...

  17. 23 CFR 635.110 - Licensing and qualification of contractors.

    Science.gov (United States)

    2010-04-01

    ... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any...) No contractor shall be required by law, regulation, or practice to obtain a license before submission...

  18. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  19. 14 CFR 1274.942 - Export licenses.

    Science.gov (United States)

    2010-01-01

    ... writing, that the Agreement Officer authorize it to export ITAR-controlled technical data (including... appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Recipient shall be responsible for obtaining...

  20. Transcranial electric stimulation for intraoperative motor evoked potential monitoring: dependence of required stimulation current on interstimulus interval value.

    Science.gov (United States)

    Joksimovic, Boban; Szelenyi, Andrea; Seifert, Volker; Damjanovic, Aleksandar; Damjanovic, Aleksandra; Rasulic, Lukas

    2015-05-01

    To evaluate the relationship between stimulus intensity by constant current transcranial electric stimulation and interstimulus interval (ISI) for eliciting muscle motor evoked potentials (MEPs) in three different hand muscles and the tibialis anterior muscles. We tested intraoperatively different monophasic constant current pulses and ISIs in 22 patients with clinically normal motor function. Motor thresholds of contralateral muscle MEPs were determined at 0.5 milliseconds (ms) pulse duration and ISIs of 1, 2, 3, 4, 5, and 10 ms using a train of 2, 3, and 5 monophasic constant current pulses of 62 to 104 mA before craniotomy and after closure of the dura mater. The lowest stimulation threshold to elicit MEPs in the examined muscles was achieved with a train of 5 pulses (ISI: 3 ms) before craniotomy, which was statistically significant compared with 2 pulses (ISI: 3 ms) as well as 3 pulses (ISIs: 3 and 10 ms). An ISI of 3 ms gave the lowest motor thresholds with statistical significance compared with the ISIs of 4 ms (2 pulses) and of 1 ms (3 pulses). All current intensity (mA) and ISI (ms) relationship graphs had a trend of the exponential function as y = a + bx + c ρ (x), where y is intensity (mA) and x is ISI (ms). The minimum of the function was determined for each patient and each muscle. The difference was statistically significant between 3 and 5 pulses before craniotomy and between 3 and 5 pulses and 2 and 5 pulses after closure of the dura mater. In adult neurosurgical patients with a normal motor status, a train of 5 pulses and an ISI of 3 ms provide the lowest motor thresholds. We provided evidence of the dependence of required stimulation current on ISI. Georg Thieme Verlag KG Stuttgart · New York.

  1. Partner Selection in Technological Licensing Agreements

    DEFF Research Database (Denmark)

    Laursen, Keld; Trombini, Giulia

    This paper investigates the matching of seller and buyer firms in the market for technology licensing. By combining organizational learning theory with the industrial organization approach, we propose a matching model in which technological similarities in terms of relatedness and familiarity work...... that is technologically unrelated, ex ante familiarity with the licensors’ technology is required. We contend also that there is interdependence between technological learning and market competition: if partners are in the same product markets, the likelihood of technology license contractual partnerships decreases...

  2. Licensing in an International Market

    Science.gov (United States)

    Ferreira, Fernanda A.

    2008-09-01

    We study the effects of entry of a foreign firm on domestic welfare in the presence of licensing, when the entrant is technologically superior to the incumbent. We show that foreign entry increases domestic welfare for sufficiently large technological differences between the firms under both fixed-fee licensing and royalty licensing.

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  4. Reproductive 'surrogacy' and parental licensing.

    Science.gov (United States)

    Overall, Christine

    2015-06-01

    A serious moral weakness of reproductive 'surrogacy' is that it can be harmful to the children who are created. This article presents a proposal for mitigating this weakness. Currently, the practice of commercial 'surrogacy' operates only in the interests of the adults involved (the gestator and the commissioning individuals who employ her), not in the interests of the child who is created. Whether 'surrogacy' is seen as the purchase of a baby, the purchase of parental rights, or the purchase of reproductive labor, all three views share the same significant flaws. They endorse the transfer, for a fee, of the infant from the woman who gestated it to those who commissioned it, but without justifying such a transfer; they fail to demonstrate that the commissioners have any entitlement to the infant, or, for that matter, suitability to be the infant's parents; and they fail to take any notice of the infant's needs, interests, and wellbeing. A mere genetic connection is not enough to establish that the commissioners are entitled to receive the baby or that they are competent to raise it. Their good intentions, however caring, are not enough. Therefore, just as in the practice of adoption, there should be a formal institutionalized system for screening and licensing the prospective social parents, which would make the infant's needs, interests, and wellbeing paramount. I reply to several potential objections to this proposal, including the objection that genetic parents who raise their own child are not screened and licensed. © 2014 John Wiley & Sons Ltd.

  5. Nuclear power plant licensing: opportunities for improvement

    International Nuclear Information System (INIS)

    1977-06-01

    On April 20, 1977, the Commission directed that recently completed licensing actions be reviewed by the staff for the purpose of identifying ways to improve the effectiveness and efficiency of NRC nuclear power plant licensing activities. This report summarizes the results of a study undertaken by an internal ad hoc Study Group established in response to that directive. The Study Group limited its considerations to safety and environmental review activities. The background, scope, assumptions and objectives of the study are discussed. A prime assumption of this study was that improvements in the efficiency should not be permitted to reduce the current quality achieved in the licensing process. This consideration underlies the conclusions and recommendations of the study

  6. Selected review of regulatory standards and licensing issues for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.; Thomas, F.A.

    1982-11-01

    This report presents a compilation and description of current foreign regulatory standards and licensing issues in the areas of interest associated with Siting, Structural Engineering, Metallurgy and Materials, and Mechanical Engineering. In addition, summary comparisons of the requirements of both the US and foreign nuclear power plant regulatory standards are provided. The selected foreign countries surveyed include Canada, France, Japan, Sweden, United Kingdom of Great Britain and Northern Ireland, and the Federal Republic of Germany

  7. Cask development, testing, and licensing

    International Nuclear Information System (INIS)

    Quinn, G.J.; Haelsig, R.T.; Warrant, M.M.

    1986-01-01

    The NuPac 125-B Rail Cask was developed to provide a safe means of transporting the damaged core of Three Mile Island Unit 2 from the TMI site at Middletown, PA, to the Idaho National Engineering laboratory (INEL) at Idaho Falls, ID. The development of the NuPac 125-B Rail Cask posed two engineering and technical management challenges; Licensing Strategy - The NuPac 125-B Rail Cask represented the first irradiated fuel rail cask developed within the United States in the past decade, a decade characterized by changing nuclear regulations, and Accelerated Schedule - The TMI-2 defueling schedule demanded a cask development schedule one-third as long as normally required. These challenges governed the overall development and licensing process for the cask. First, a high degree of conservation was incorporated into the design to allow quick, simplified demonstrations of adequacy to regulatory staff. Second, redundant design techniques were employed in all areas of uncertainty. The testing program eliminated performance uncertainties and validated predictions and predictive models. Drop tests of a quarter-scale model of the cask were conducted, and results were correlated with analytic predictions to verify structural and mechanical performance of the cask. Full-scale tests of the canisters were conducted to verify structural behavior of canister internals which provide criticality control. This paper describes the testing program for the NuPac 125-B Rail Cask, presents results therefrom, and correlates findings with Regulation 10 CFR 71 of the U.S. Nuclear Regulatory Commission

  8. The nuclear licensing procedure

    International Nuclear Information System (INIS)

    Wagner, H.

    1976-01-01

    To begin with, the present nuclear licensing procedure is illustrated by a diagram. The relationship between the state and the Laender, the various experts (GRS - IRS + LRA -, TUEV, DWD, university institutes, firms of consulting engineers, etc), participation of the public, e.g. publication of the relevant documents, questions, objections (made by individuals or by groups such as citizens' initiatives), public discussion, official notice, appeals against the decision, the right of immediate execution of the decision are shortly dealt with. Finally, ways to improve the licensing procedure are discussed, from the evaluation of the documents to be submitted, published, and examined by the authorities (and their experts) up to an improvement of the administrative procedure. An improved licensing procedure should satisfy the well-founded claims of the public for more transparency as well as the equally justifiable claims of industry and utilities in order to ensure that the citizens' legal right to have safe and adequate electric power is guaranteed. The updated energy programme established by the Federal Government is mentioned along with the effectiveness of dealing with nuclear problems on the various levels of a Land government. (orig.) [de

  9. 7 CFR 735.101 - Financial records and reporting requirements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Financial records and reporting requirements. 735.101... Warehouse Licensing § 735.101 Financial records and reporting requirements. (a) Warehouse operators must maintain complete, accurate, and current financial records that must be available to DACO for review or...

  10. Nuclear power plant licensing in Canada

    International Nuclear Information System (INIS)

    Tong, J.S.C.; Waddington, J.G.

    1997-01-01

    The Canadian nuclear power plant licensing practice which has evolved over three decades provides a regulatory framework that promotes safe design and operation of CANDU power plants. From the very outset, it recognizes the need for simple and reliable safety systems which are separate from the systems that are normally used to produce electricity. Further, it requires the reliability of safety systems be demonstrated by routine tests during plant operation. Over the three decades, the analysis requirements to demonstrate the performance and reliability of plant systems that have a role in the detection and mitigating of accidents have also evolved. Today's requirements are defined in consultative documents C-6 and C-98. One recurring theme throughout the evolution of the licensing practice is the maxim of prescribing only basic safety requirements and rules so that designers and operators have the freedom to devise the best possible design features and operating practices

  11. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  12. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  13. Online purchases of an expanded range of condom sizes in comparison to current dimensional requirements allowable by US national standards.

    Science.gov (United States)

    Cecil, Michael; Warner, Lee; Siegler, Aaron J

    2013-11-01

    Across studies, 35-50% of men describe condoms as fitting poorly. Rates of condom use may be inhibited in part due to the inaccessibility of appropriately sized condoms. As regulated medical devices, condom sizes conform to national standards such as those developed by the American Society for Testing and Materials (ASTM) or international standards such as those developed by the International Organisation for Standardisation (ISO). We describe the initial online sales experience of an expanded range of condom sizes and assess uptake in relation to the current required standard dimensions of condoms. Data regarding the initial 1000 sales of an expanded range of condom sizes in the United Kingdom were collected from late 2011 through to early 2012. Ninety-five condom sizes, comprising 14 lengths (83-238mm) and 12 widths (41-69mm), were available. For the first 1000 condom six-pack units that were sold, a total of 83 of the 95 unique sizes were purchased, including all 14 lengths and 12 widths, and both the smallest and largest condoms. Initial condom purchases were made by 572 individuals from 26 countries. Only 13.4% of consumer sales were in the ASTM's allowable range of sizes. These initial sales data suggest consumer interest in an expanded choice of condom sizes that fall outside the range currently allowable by national and international standards organisations.

  14. Meeting report: Ocean ‘omics science, technology and cyberinfrastructure: current challenges and future requirements (August 20-23, 2013)

    Science.gov (United States)

    Gilbert, Jack A; Dick, Gregory J.; Jenkins, Bethany; Heidelberg, John; Allen, Eric; Mackey, Katherine R. M.

    2014-01-01

    The National Science Foundation’s EarthCube End User Workshop was held at USC Wrigley Marine Science Center on Catalina Island, California in August 2013. The workshop was designed to explore and characterize the needs and tools available to the community that is focusing on microbial and physical oceanography research with a particular emphasis on ‘omic research. The assembled researchers outlined the existing concerns regarding the vast data resources that are being generated, and how we will deal with these resources as their volume and diversity increases. Particular attention was focused on the tools for handling and analyzing the existing data, on the need for the construction and curation of diverse federated databases, as well as development of shared, interoperable, “big-data capable” analytical tools. The key outputs from this workshop include (i) critical scientific challenges and cyber infrastructure constraints, (ii) the current and future ocean ‘omics science grand challenges and questions, and (iii) data management, analytical and associated and cyber-infrastructure capabilities required to meet critical current and future scientific challenges. The main thrust of the meeting and the outcome of this report is a definition of the ‘omics tools, technologies and infrastructures that facilitate continued advance in ocean science biology, marine biogeochemistry, and biological oceanography. PMID:25197495

  15. Meeting report: Ocean 'omics science, technology and cyberinfrastructure: current challenges and future requirements (August 20-23, 2013).

    Science.gov (United States)

    Gilbert, Jack A; Dick, Gregory J; Jenkins, Bethany; Heidelberg, John; Allen, Eric; Mackey, Katherine R M; DeLong, Edward F

    2014-06-15

    The National Science Foundation's EarthCube End User Workshop was held at USC Wrigley Marine Science Center on Catalina Island, California in August 2013. The workshop was designed to explore and characterize the needs and tools available to the community that is focusing on microbial and physical oceanography research with a particular emphasis on 'omic research. The assembled researchers outlined the existing concerns regarding the vast data resources that are being generated, and how we will deal with these resources as their volume and diversity increases. Particular attention was focused on the tools for handling and analyzing the existing data, on the need for the construction and curation of diverse federated databases, as well as development of shared, interoperable, "big-data capable" analytical tools. The key outputs from this workshop include (i) critical scientific challenges and cyber infrastructure constraints, (ii) the current and future ocean 'omics science grand challenges and questions, and (iii) data management, analytical and associated and cyber-infrastructure capabilities required to meet critical current and future scientific challenges. The main thrust of the meeting and the outcome of this report is a definition of the 'omics tools, technologies and infrastructures that facilitate continued advance in ocean science biology, marine biogeochemistry, and biological oceanography.

  16. Westinghouse AP1000 licensing maturity

    International Nuclear Information System (INIS)

    Schulz, T.; Vijuk, R.P.

    2005-01-01

    The Westinghouse AP1000 Program is aimed at making available a nuclear power plant that is economical in the U.S deregulated electrical power industry in the near-term. The AP1000 is two-loop 1000 MWe pressurizer water reactor (PWR). It is an up rated version of the AP600. The AP1000 uses passive safety systems to provide significant and measurable improvements in plant simplification, safety, reliability, investment protection and plant costs. The AP1000 uses proven technology, which builds on over 35 years of operating PWR experience. The AP1000 received Final Design Approval by the United States Nuclear Regulatory Commission (U.S. NRC) in September 2004. The AP1000 meets the US utility requirements. The AP1000 and its sister plant the AP600 have gone through a very through and complete licensing review. This paper describes the U.S. NRC review efforts of both the AP600 and the AP1000. The detail of the review and the independent calculations, evaluations and testing is discussed. The AP600 licensing documentation was submitted in 1992. The U.S. NRC granted Final Design Approval in 1999. During the intervening 7 years, the U.S. NRC asked thousands of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. For the AP1000 Westinghouse first engaged the U.S. NRC in pre-certification discussions to define the extent of the review required, since the design is so similar to the AP600. The AP1000 licensing documentation was submitted in March 2002. The U.S. NRC granted Final Design Approval in September 2004. During the intervening 2 1/2 years, the U.S. NRC asked hundreds of questions, performed independent safety analysis, audited Westinghouse calculations and analysis, and performed independent testing. The more significant areas of discussion will be described. The implications of this review and approval on AP1000 applications in

  17. Licensing Air and Transboundary Shipments of Spent Nuclear Fuel

    International Nuclear Information System (INIS)

    Komarov, S.V.; Budu, M.E.; Derganov, D.V.; Savina, O.A.; Bolshinsky, I.M.; Moses, S.D.; Biro, L.

    2016-01-01

    Since 1996 the IAEA TS-R-1 regulation included new requirements applicable to transport of fissile materials by air. The later 2005 and 2009 editions confirmed the validity of those provisions. Despite the fact that the IAEA TS-R-1 allows for air shipments of SNF in Type B and Type C packages, the examples of such shipments are not abundant. Nuclear regulatory bodies and transport safety experts are cautious about air shipments of SNF. Why so? What are the risks? What are the alternatives? In this new regulatory framework, in 2009, two air shipments in Type B packages of Research Reactor (RR) Spent Nuclear Fuel (SNF) from Romania and Libya were performed under the U.S. DOE/NNSA RRRFR Program. The first licensing process of such shipment brought up many questions about package and shipment safety from the licensing experts' side and so the scope of analyses exceeded the requirements of IAEA. Under the thorough supervision of Rosatom and witnessed by DOE and CNCAN, all questions were answered by various strength analyses and risk evaluations. But the progress achieved didn't stop here. In 2010-2011, an energy absorption container (EAC) with titanium spheres as absorbers based on the SKODA VPVR/M cask was designed as the first Type C package in the world destined for RR SNF, currently under approval process. At the same time, intense preparations for the safe removal of the Russian-origin damaged RR SNF from Serbia, Vinca were in progress. The big amount of SNF and its rapidly worsening condition imposed as requirements to organize only one shipment as fast as possible, i.e. using at the maximum extent the entire experience available from other SNF shipments. The long route, several transit countries and means of transport, two different casks, new European regulations and many other issues resulted for the Serbian shipment in one of the most complex SNF shipments’ licensing exercise. This paper shows how the international regulatory framework ensures the

  18. A COMPARATIVE STUDY OF STATE LICENSING BOARDS FOR SCHOOL ADMINISTRATION AND OTHER SELECTED PROFESSIONS.

    Science.gov (United States)

    MOLINARI, RALPH G.; AND OTHERS

    COMPARISON OF THE COMPOSITION, CHARACTERISTICS, AND CURRENT LICENSING PRACTICES OF STATE LICENSING BOARDS FOR EDUCATIONAL ADMINISTRATION WITH LICENSING PROGRAMS FOR SEVEN OTHER PROFESSIONS, (ACCOUNTANCY, ARCHITECTURE, DENTISTRY, ENGINEERING, LAW, MEDICINE, AND NURSING) WAS THE PURPOSE OF THIS NATIONWIDE STUDY. THE RESEARCH PROCEDURES WERE DIVIDED…

  19. The licensing procedure under Atomic Energy Law

    International Nuclear Information System (INIS)

    Ronellenfitsch, M.

    1983-01-01

    This post-doctoral thesis of 1981 has been updated to include developments in this field up to the year 1983. The author discusses in detail all questions relating to the peaceful uses of nuclear energy in the Federal Republic of Germany, predominantly from the point of view of administrative law. He investigates nuclear energy and its contribution to electricity supplies with a view to other energy sources, renewable energy sources, alternative energy policies, nuclear fuel and the fuel cycle, development of the nuclear industry, nuclear power stations in operation, under construction, or in development. Following a survey of the nuclear controversy, both on the national and the international level, the author reviews the legal system and arising controversies in the Federal Republic of Germany, defining the purpose of this thesis to be the systematic analysis of the available legal instruments, in order to show structural deficiencies in the planning law relating to nuclear power stations, and thus reasons of ambiguities within the licensing procedure. The author studies the following terms and requirements: licensing requirements and licensability, the licensing method and scenario, the legal character of licences, their contents and effects within the stepwise procedure, and due publication. (HSCH) [de

  20. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  1. License to Learn

    DEFF Research Database (Denmark)

    Leone, Maria Isabella; Boccardelli, Paolo; Reichstein, Toke

    2016-01-01

    the technology. Drawing on a sample of 133 licensees and an equal number of matched nonlicensees, we present empirical evidence that thick contracts propel the licensees' likelihood of introducing new inventions. It is also found that thick contracts act as a substitute for licensees' absorptive capacity....... Licensees that are more familiar with the licensed technology are in less need of assistance from the licensors to assimilate and integrate the knowledge. However, this substitution effect is neutralized once the hurdle of invention has been overcome, meaning that the licensees have succeeded to ignite...... the invention process, suggesting the exploitation of the learning curve, triggered by their mutual understanding....

  2. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  3. License agreement, employee work

    OpenAIRE

    Poncová, Veronika

    2012-01-01

    The rigorous thesis is focused on license agreement and employee work. The aim of the thesis is not only an analysis of the use of a copyrighted work by a person different from the author of the work, but also an analysis of the performance of copyright by a person different from the author of the work. The thesis consists of five chapters. The opening chapter provides a summary of the notion of copyright, its sources at the national and international levels, but also the European Union legis...

  4. Licensing and regulatory control of nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schnurer, H.

    1975-01-01

    Legal basis; licensing requirements by the Atomic Energy Act, national law, international law and recommendations, and by technical rules and standards; licensing process: types of licences, responsibilities, sequence of the procedure; role of technical advisory bodies, enforcement of licensing actions. (HP) [de

  5. 48 CFR 227.7009 - Patent releases, license agreements, and assignments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Patent releases, license... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Infringement Claims, Licenses, and Assignments 227.7009 Patent releases, license agreements, and...

  6. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  7. A new licensing strategy for Canadian mobile earth stations

    Science.gov (United States)

    Amero, Ronald G.

    1990-01-01

    Initiatives presently under consideration by the Department of Communications which will greatly simplify the licensing process for mobile earth stations are addressed. The current licensing approach is reviewed and the limitations of that system identified. A new approach is needed to respond to the needs of mobile satellite users in the 1990's and beyond, one which will have a minimal impact on the user while still respecting the legislative responsibilities of the department under the new Radiocommunication Act and the General Radio Regulations. The objective of this new strategy is to lead to a transparent licensing scheme for the end user, which in turn could lead to license exemption of blanket licenses as soon as possible.

  8. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  9. Spent fuel storage requirements

    International Nuclear Information System (INIS)

    Fletcher, J.

    1982-06-01

    Spent fuel storage requirements, as projected through the year 2000 for U.S. LWRs, were calculated using information supplied by the utilities reflecting plant status as of December 31, 1981. Projections through the year 2000 combined fuel discharge projections of the utilities with the assumed discharges of typical reactors required to meet the nuclear capacity of 165 GWe projected by the Energy Information Administration (EIA) for the year 2000. Three cases were developed and are summarized. A reference case, or maximum at-reactor (AR) capacity case, assumes that all reactor storage pools are increased to their maximum capacities as estimated by the utilities for spent fuel storage utilizing currently licensed technologies. The reference case assumes no transshipments between pools except as currently licensed by the Nuclear Regulatory Commission (NRC). This case identifies an initial requirement for 13 MTU of additional storage in 1984, and a cumulative requirement for 14,490 MTU additional storage in the year 2000. The reference case is bounded by two alternative cases. One, a current capacity case, assumes that only those pool storage capacity increases currently planned by the operating utilities will occur. The second, or maximum capacity with transshipment case, assumes maximum development of pool storage capacity as described above and also assumes no constraints on transshipment of spent fuel among pools of reactors of like type (BWR, PWR) within a given utility. In all cases, a full core discharge capability (full core reserve or FCR) is assumed to be maintained for each reactor, except that only one FCR is maintained when two reactors share a common pool. For the current AR capacity case the indicated storage requirements in the year 2000 are indicated to be 18,190 MTU; for the maximum capacity with transshipment case they are 11,320 MTU

  10. Establishment of regulatory framework for the development reactor licensing

    International Nuclear Information System (INIS)

    Jo, Jong C.; Yune, Young G.; Kim, Woong S.; Ahn, Sang K.; Kim, In G.; Kim, Hho J.

    2003-01-01

    With a trend that various types of advanced reactor designs are currently under development worldwide, the Korea Atomic Energy Research Institute has been developing an advanced reactor called ' System-integrated Modular Advanced Reactor (SMART)', which is a small sized integral type pressurized water reactor with a rated thermal power of 330 MW. To demonstrate the safety and the performance of the SMART reactor design, the SMART Research and Development Center has embarked to build a scaled-down pilot plant of SMART, called 'SMART-P' with a rated thermal power of 65 MW. In preparation for the forthcoming applications for both construction permit and operating license of SMART-P in the near future, the Korea Institute of Nuclear Safety is developing a new regulatory framework for licensing review of such a development reactor, which covers establishment of licensing process, identification and resolution of technical and safety issues, development of regulatory evaluation or verification-purpose computer codes and analytical methods, and establishment of design-specific, general design and operating criteria, regulations, and associated regulatory guides. This paper presents the current activities for establishing a regulatory framework for the licensing of a research and development reactor. Discussions are made on the SMART-P development program, the current Korean regulatory framework for reactor licensing, the SMART-P licensing-related issues, and the approach and strategy for developing an effective regulatory framework for the SMART-P licensing

  11. Exporting the Canadian licensing program

    International Nuclear Information System (INIS)

    Whelan, D.J.

    1981-06-01

    This paper deals with the problems of an overseas regulatory agency in licensing a Canadian-supplied nuclear plant which is referenced to a plant in Canada. Firstly, the general problems associated with the use of a reference plant are discussed. This is followed by a discussion of specific problems which arise from the licensing practices in Canada. The paper concludes with recommendations to simplify the task of demonstrating the licensability of an overseas CANDU plant

  12. NRC Licensing Status Summary Report for NGNP

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinsey, James Carl [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  13. The Licensing of New Nuclear Power Plants in Europe

    International Nuclear Information System (INIS)

    Raetzke, C.

    2008-01-01

    After an introduction dealing with the nuclear Renaissance in Europe and the specific situation of Germany and of Italy, the article focuses on the question of licensing processes for new reactors. New nuclear power plant projects involve a substantial investment and electric utilities will only take this decision if the licensing and regulatory risk can be adequately managed. Licensing processes should be predictable and efficient in order to give sufficient assurance to applicants. The article discusses best practice in licensing by giving some examples of suitable licensing processes of other countries. It also highlights international initiatives aimed at harmonizing safety requirements for new reactors and a multinational cooperation in reactor design review. These issues should be carefully considered by any country wanting to get new nuclear started. [it

  14. 77 FR 63343 - Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-10-16

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... for an inoperable diesel generator (DG). A commensurate change is also proposed to extend the maximum... alternating current power source (i.e., a supplemental diesel generator) with the capability to power any E...

  15. Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    acquisition. The findings indicate that technology licensing is positively related to the number of inventions produced by the licensee in the years subsequent to the licensing deal. Subsequently, I investigate the moderating effect that organizational slack and myopia have on this main relationship....... The findings also suggest that high levels of Organizational Slack (available financial resources) strengthen the positive effect of licensing on innovation. However, higher levels of Organizational Myopia (the extent to which a firm draws on its own knowledge) can decrease the main effect of licensing....

  16. Determining k channel activation curves from k channel currents often requires the goldman-hodgkin-katz equation.

    Science.gov (United States)

    Clay, John R

    2009-01-01

    Potassium ion current in nerve membrane, I(K), has traditionally been described by I(K) = g(K)(V - E(K)), where g(K) is the K ion conductance, V is membrane potential and E(K) is the K(+) Nernst potential. This description has been unchallenged by most investigators in neuroscience since its introduction almost 60 years ago. The problem with the I(K) approximately (V - E(K)) proportionality is that it is inconsistent with the unequal distribution of K ions in the intra- and extracellular bathing media. Under physiological conditions the intracellular K(+) concentration is significantly higher than the extracellular concentration. Consequently, the slope conductance at potentials positive to E(K) cannot be the same as that for potentials negative to E(K), as the linear proportionality between I(K) and (V - E(K)) requires. Instead I(K) has a non-linear dependence on (V - E(K)) which is well described by the Goldman-Hodgkin-Katz equation. The implications of this result for K(+) channel gating and membrane excitability are reviewed in this report.

  17. Determining K+ channel activation curves from K+ channel currents often requires the Goldman-Hodgkin-Katz equation

    Directory of Open Access Journals (Sweden)

    john r Clay

    2009-12-01

    Full Text Available Potassium ion current in nerve membrane, IK, has traditionally been described by IK = gK(V-EK, where gK is the K ion conductance, V is membrane potential, and EK is the K+ Nernst potential. This description has been unchallenged by most investigators in neuroscience since its introduction almost sixty years ago. The problem with the IK ~ (V-EK proportionality is that it is inconsistent with the unequal distribution of K ions in the intra- and extracellular bathing media. Under physiological conditions the intracellular K+ concentraion is significantly higher than the extracellular concentration. Consequently, the slope conductance at potentials positive to EK cannot be the same as that for potentials negative to EK, as the linear proportionality requires. Instead IK has a non-linear dependence on (V-EK which is well described by the Goldman-Hodgkin-Katz equation. The implications of this result for K+ channel gating and membrane excitability are reviewed in this report.

  18. WWER 440/213 NPP containment from the point of view of IAEA requirements and current European practice

    International Nuclear Information System (INIS)

    Sabata, M.

    2000-01-01

    In principle, in a NPP three barriers are used to prevent the release of radioactive substances into the environment: the fuel cladding, the primary circuit boundary, and the containment. The presentation deals with the third barrier - the containment, and explains the philosophy of maximum design accident management in the containment of WWER-440/213 NPPs. This type of containment is shown to be an original and fully functional technical solution. Due to the use of the large reserve of the H 3 BO 3 solution and to the active spray systems, an underpressure can be quickly established, thus minimizing any impact of the accident on the environment. The capability of the bubble condenser system for a maximum design accident has been proven by analyses and by tests performed within the framework of PHARE PH 2.13/95: the condenser system can reduce the pressure in the containment in an effective way. The majority of questions arising so far have been answered and the concern resulting from insufficient verification of the system with regard to western standards has been refuted. The WWER-440/213 is fully consistent with IAEA requirements and with current European practice. (A.K.)

  19. Both Mother and Infant Require a Vitamin D Supplement to Ensure That Infants' Vitamin D Status Meets Current Guidelines.

    Science.gov (United States)

    Aghajafari, Fariba; Field, Catherine J; Weinberg, Amy R; Letourneau, Nicole

    2018-03-29

    We examined the association between maternal vitamin D intake during breastfeeding with their infants' vitamin D status in infants who did or did not receive vitamin D supplements to determine whether infant supplementation was sufficient. Using plasma from a subset of breastfed infants in the APrON (Alberta Pregnant Outcomes and Nutrition) cohort, vitamin D status was measured by liquid chromatography-tandem mass spectrometry. Maternal and infants' dietary data were obtained from APrON's dietary questionnaires. The median maternal vitamin D intake was 665 International Units (IU)/day, while 25% reported intakes below the recommended 400 IU/day. Of the 224 infants in the cohort, 72% were exclusively breastfed, and 90% were receiving vitamin D supplements. Infants' median 25(OH)D was 96.0 nmol/L (interquartile ranges (IQR) 77.6-116.2), and 25% had 25(OH)D < 75 nmol/L. An adjusted linear regression model showed that, with a 100 IU increase in maternal vitamin D intake, infants' 25(OH)D increased by 0.9 nmol/L controlling for race, season, mid-pregnancy maternal 25(OH)D, birthweight, and whether the infant received daily vitamin D supplement (β = 0.008, 95% confidence interval (CI) 0.002, 0.13). These results suggest that, to ensure infant optimal vitamin D status, not only do infants require a supplement, but women also need to meet current recommended vitamin D intake during breastfeeding.

  20. Both Mother and Infant Require a Vitamin D Supplement to Ensure That Infants’ Vitamin D Status Meets Current Guidelines

    Directory of Open Access Journals (Sweden)

    Fariba Aghajafari

    2018-03-01

    Full Text Available We examined the association between maternal vitamin D intake during breastfeeding with their infants’ vitamin D status in infants who did or did not receive vitamin D supplements to determine whether infant supplementation was sufficient. Using plasma from a subset of breastfed infants in the APrON (Alberta Pregnant Outcomes and Nutrition cohort, vitamin D status was measured by liquid chromatography-tandem mass spectrometry. Maternal and infants’ dietary data were obtained from APrON’s dietary questionnaires. The median maternal vitamin D intake was 665 International Units (IU/day, while 25% reported intakes below the recommended 400 IU/day. Of the 224 infants in the cohort, 72% were exclusively breastfed, and 90% were receiving vitamin D supplements. Infants’ median 25(OHD was 96.0 nmol/L (interquartile ranges (IQR 77.6–116.2, and 25% had 25(OHD < 75 nmol/L. An adjusted linear regression model showed that, with a 100 IU increase in maternal vitamin D intake, infants’ 25(OHD increased by 0.9 nmol/L controlling for race, season, mid-pregnancy maternal 25(OHD, birthweight, and whether the infant received daily vitamin D supplement (β = 0.008, 95% confidence interval (CI 0.002, 0.13. These results suggest that, to ensure infant optimal vitamin D status, not only do infants require a supplement, but women also need to meet current recommended vitamin D intake during breastfeeding.

  1. Both Mother and Infant Require a Vitamin D Supplement to Ensure That Infants’ Vitamin D Status Meets Current Guidelines

    Science.gov (United States)

    Weinberg, Amy R.; Letourneau, Nicole

    2018-01-01

    We examined the association between maternal vitamin D intake during breastfeeding with their infants’ vitamin D status in infants who did or did not receive vitamin D supplements to determine whether infant supplementation was sufficient. Using plasma from a subset of breastfed infants in the APrON (Alberta Pregnant Outcomes and Nutrition) cohort, vitamin D status was measured by liquid chromatography-tandem mass spectrometry. Maternal and infants’ dietary data were obtained from APrON’s dietary questionnaires. The median maternal vitamin D intake was 665 International Units (IU)/day, while 25% reported intakes below the recommended 400 IU/day. Of the 224 infants in the cohort, 72% were exclusively breastfed, and 90% were receiving vitamin D supplements. Infants’ median 25(OH)D was 96.0 nmol/L (interquartile ranges (IQR) 77.6–116.2), and 25% had 25(OH)D < 75 nmol/L. An adjusted linear regression model showed that, with a 100 IU increase in maternal vitamin D intake, infants’ 25(OH)D increased by 0.9 nmol/L controlling for race, season, mid-pregnancy maternal 25(OH)D, birthweight, and whether the infant received daily vitamin D supplement (β = 0.008, 95% confidence interval (CI) 0.002, 0.13). These results suggest that, to ensure infant optimal vitamin D status, not only do infants require a supplement, but women also need to meet current recommended vitamin D intake during breastfeeding. PMID:29596362

  2. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    Science.gov (United States)

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  3. 77 FR 70837 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-27

    ... intervene shall be filed in accordance with the Commission's ``Rules of Practice for Domestic Licensing... request: The proposed change will delete Function 14, SG [Steam Generator] Water Level--Low, Coincident... capability to shut down the reactor when required on Low--Low Steam Generator water level. The ability to...

  4. 77 FR 73684 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-12-11

    ... in accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10... emergency diesel generator, and the stored lube oil inventory will also continue to require that a 7-day supply be available for each diesel generator. The changes are consistent with NRC-approved Technical...

  5. 77 FR 67679 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Science.gov (United States)

    2012-11-13

    ... diesel generator surveillance requirements. Margin of safety is related to the ability of the fission... evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed... accordance with the Commission's ``Rules of Practice for Domestic Licensing Proceedings'' in 10 CFR Part 2...

  6. Image simulation for automatic license plate recognition

    Science.gov (United States)

    Bala, Raja; Zhao, Yonghui; Burry, Aaron; Kozitsky, Vladimir; Fillion, Claude; Saunders, Craig; Rodríguez-Serrano, José

    2012-01-01

    Automatic license plate recognition (ALPR) is an important capability for traffic surveillance applications, including toll monitoring and detection of different types of traffic violations. ALPR is a multi-stage process comprising plate localization, character segmentation, optical character recognition (OCR), and identification of originating jurisdiction (i.e. state or province). Training of an ALPR system for a new jurisdiction typically involves gathering vast amounts of license plate images and associated ground truth data, followed by iterative tuning and optimization of the ALPR algorithms. The substantial time and effort required to train and optimize the ALPR system can result in excessive operational cost and overhead. In this paper we propose a framework to create an artificial set of license plate images for accelerated training and optimization of ALPR algorithms. The framework comprises two steps: the synthesis of license plate images according to the design and layout for a jurisdiction of interest; and the modeling of imaging transformations and distortions typically encountered in the image capture process. Distortion parameters are estimated by measurements of real plate images. The simulation methodology is successfully demonstrated for training of OCR.

  7. ISO 14000 and the nuclear licensing

    International Nuclear Information System (INIS)

    Martins, Nadia Soido Falcao

    1999-01-01

    As concern grows for maintaining and improving the quality of the environment and protecting human health, all the world is turning its attention to the potential environmental in pact of their industrial activities. One of the most important contribution in that way is the International Standard ISO 14000 series. In the utilization of nuclear energy, right from the inception, the safety of personnel, environment and the population has been the basic consideration. Over the years well established licenses criteria have been proposed to limit and control the environmental impact of the plant operation and emergencies situation. In this paper are discussed some specific requirements for implementation of the environmental management system specified by ISO 14000 compared to the environmental requirements for nuclear licensing. (author)

  8. Licensing assessment of the CANDU pressurized heavy water reactor. Volume I. Preliminary safety information document

    International Nuclear Information System (INIS)

    1977-06-01

    The PHWR design contains certain features that will require significant modifications to comply with USNRC siting and safety requirements. The most significant of these features are the reactor vessel; control systems; quality assurance program requirements; seismic design of structures, systems and components; and providing an inservice inspection program capability. None of these areas appear insolvable with current state-of-the-art engineering or with upgrading of the quality assurance program for components constructed outside of the USA. In order to be licensed in the U. S., the entire reactor assembly would have to be redesigned to comply with ASME Boiler and Pressure Vessel Code, Section III, Division 1 and Division 2. A summary matrix at the end of this volume identifies compliance of the systems and structures of the PHWR plant with the USNRC General Design Criteria. The matrix further identifies the estimated incremental cost to a 600 MWe PHWR that would be required to license the plant in the U. S. Further, the matrix identifies whether or not the incremental licensing cost is size dependent and the relative percentage of the base direct cost of a Canadian sited plant

  9. Licensed operating reactors

    International Nuclear Information System (INIS)

    1991-08-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  10. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  12. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  13. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  14. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. Decommissioning licensing procedure

    International Nuclear Information System (INIS)

    Perello, M.

    1979-01-01

    Decommissioning or closure of a nuclear power plant, defined as the fact that takes place from the moment that the plant stops producing for the purpose it was built, is causing preocupation. So this specialist meeting on Regulatory Review seems to be the right place for presenting and discusing the need of considering the decommissioning in the safety analysis report. The main goal of this paper related to the licensing procedure is to suggest the need of a new chapter in the Preliminary Safety Analysis Report (P.S.A.R.) dealing with the decommissioning of the nuclear power plant. Therefore, after a brief introduction the problem is exposed from the point of view of nuclear safety and finally a format of the new chapter is proposed. (author)

  16. Waste management and licensing

    International Nuclear Information System (INIS)

    Dauk, W.

    1980-01-01

    It is the Court's consideration of the repercussions the regulation on waste management of Sect. 9a of the Atomic Energy Law will have, relating to the licensing of a plant according to Sect. 7 (2) of the Atomic Energy Law which is noteworthy. Overruling its former legal conception, the Administrative Court Schleswig now assumes, together with the public opinion, that the problem of waste management being brought to a point only with the initial operation of a nuclear power station is accordingly to be taken into account in line with the discretion of licensing according to Sect. 7 (2) of the Atomic Energy Law. In addition, the Administrative Court expressed its opinion on the extent to the right of a neighbour to a nuclear power station to file suit. According to the Sections 114 and 42 (2) of the rules of Administrative Courts it is true that a plaintiff cannot take action to set aside the licence because public interests have not been taken into account sufficiently, but he may do so because his own interests have not been included in the discretionary decision. The Administrative Court is reserved when qualifying the regulation on waste management with regard to the intensity of legal control. The Court is not supposed to replace controversial issues of technology and natural sciences on the part of the executive and its experts by its own assessment. According to the proceedings, the judicial review refers to the finding as to whether decisions made by authorities are suited - according to the way in which they were made - to guarantee the safety standard prescribed in Subdivision 3 of Sect. 7 (2) of the Atomic Energy Law. (HSCH) [de

  17. Power requirements for electron cyclotron current drive and ion cyclotron resonance heating for sawtooth control in ITER

    Science.gov (United States)

    Chapman, I. T.; Graves, J. P.; Sauter, O.; Zucca, C.; Asunta, O.; Buttery, R. J.; Coda, S.; Goodman, T.; Igochine, V.; Johnson, T.; Jucker, M.; La Haye, R. J.; Lennholm, M.; Contributors, JET-EFDA

    2013-06-01

    13 MW of electron cyclotron current drive (ECCD) power deposited inside the q = 1 surface is likely to reduce the sawtooth period in ITER baseline scenario below the level empirically predicted to trigger neoclassical tearing modes (NTMs). However, since the ECCD control scheme is solely predicated upon changing the local magnetic shear, it is prudent to plan to use a complementary scheme which directly decreases the potential energy of the kink mode in order to reduce the sawtooth period. In the event that the natural sawtooth period is longer than expected, due to enhanced α particle stabilization for instance, this ancillary sawtooth control can be provided from >10MW of ion cyclotron resonance heating (ICRH) power with a resonance just inside the q = 1 surface. Both ECCD and ICRH control schemes would benefit greatly from active feedback of the deposition with respect to the rational surface. If the q = 1 surface can be maintained closer to the magnetic axis, the efficacy of ECCD and ICRH schemes significantly increases, the negative effect on the fusion gain is reduced, and off-axis negative-ion neutral beam injection (NNBI) can also be considered for sawtooth control. Consequently, schemes to reduce the q = 1 radius are highly desirable, such as early heating to delay the current penetration and, of course, active sawtooth destabilization to mediate small frequent sawteeth and retain a small q = 1 radius. Finally, there remains a residual risk that the ECCD + ICRH control actuators cannot keep the sawtooth period below the threshold for triggering NTMs (since this is derived only from empirical scaling and the control modelling has numerous caveats). If this is the case, a secondary control scheme of sawtooth stabilization via ECCD + ICRH + NNBI, interspersed with deliberate triggering of a crash through auxiliary power reduction and simultaneous pre-emptive NTM control by off-axis ECCD has been considered, permitting long transient periods with high fusion

  18. A licensing discussion: SMRs in Canada

    International Nuclear Information System (INIS)

    De Vos, M.

    2013-01-01

    The CNSC (Canadian AECB) is ready to regulate Small Modular Reactors (SMR) facilities in Canada. The CNSC is well situated to engage with proponents of SMR reactors in design reviews or licensing discussions. A risk-informed (graded) approach is possible in many instances for reactors but it is not a relaxation of requirements. The vendor design review process helps reduce regulatory risks by encouraging early engagement.

  19. Current-use pesticides in stream water and suspended particles following runoff: exposure, effects, and mitigation requirements.

    Science.gov (United States)

    Bereswill, Renja; Streloke, Martin; Schulz, Ralf

    2013-06-01

    The European Union's directive for sustainable use of pesticides requires implementing risk mitigation measures at streams threatened by pesticide entries. The need for mitigation measures was investigated at 10 stream sites within an intensively used arable region in central Germany by characterizing pesticide exposure following edge-of-field runoff and effects on the aquatic macroinvertebrates. Moreover, the influence of riparian buffer strip width (as a mitigation measure) at the sampling sites was considered. Generally, invertebrate fauna was dominated by pesticide-tolerant species, suggesting a high pesticide exposure at almost all sites. This result is also reflected by the elevated levels of suspended particle contamination in terms of toxic units (logTUMax  > -2), corresponding to one-hundredth of the median lethal concentration (LC50) to Daphnia magna. At two sites that received high aqueous-phase entries of the pyrethroid lambda-cyhalothrin (logTUMax  > -0.6), the abundance and number of sensitive species in terms of the species at risk index decreased during the pesticide application period. In contrast, no acute significant negative effects on macroinvertebrates were observed at sites characterised by low water-phase toxicity (logTUMax  < -3.5). An influence of riparian buffer strip width on pesticide exposure was not observed, supposedly because of the presence of erosion rills and ephemeral ditches. In conclusion, results show that mitigation measures (such as the improvement of currently present riparian buffer strips) are needed in the study area. Copyright © 2013 SETAC.

  20. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  1. AGING MANAGMENT OF REACTOR COOLANT SYSTEM MECHANICAL COMPONENTS FOR LICENSE RENEWAL

    International Nuclear Information System (INIS)

    SUBUDHI, M.; MORANTE, R.; LEE, A.D.

    2002-01-01

    The reactor coolant system (RCS) mechanical components that require an aging management review for license renewal include the primary loop piping and associated connections to other support systems, reactor vessel, reactor vessel internals, pressurizer. steam generators, reactor coolant pumps, and all other inter-connected piping, pipe fittings, valves, and bolting. All major RCS components are located inside the reactor building. Based on the evaluation findings of recently submitted license renewal applications for pressurized water reactors, this paper presents the plant programs and/or activities proposed by the applicants to manage the effects of aging. These programs and/or activities provide reasonable assurance that the intended function(s) of these mechanical components will be maintained for the period of extended operation. The license renewal application includes identification of RCS subcomponents that are within the scope of license renewal and are vulnerable to age-related degradation when exposed to environmental and operational conditions. determination of the effects of aging on their intended safety functions. and implementation of the aging management programs and/or activities including both current and new programs. Industry-wide operating experience, including generic communication by the NRC, is part of the aging management review for the RCS components. In addition, this paper discusses time-limited aging analyses associated with neutron embrittlement of the reactor vessel beltline region and thermal fatigue

  2. Licensing Surrogate Decision-Makers.

    Science.gov (United States)

    Rosoff, Philip M

    2017-06-01

    As medical technology continues to improve, more people will live longer lives with multiple chronic illnesses with increasing cumulative debilitation, including cognitive dysfunction. Combined with the aging of society in most developed countries, an ever-growing number of patients will require surrogate decision-makers. While advance care planning by patients still capable of expressing their preferences about medical interventions and end-of-life care can improve the quality and accuracy of surrogate decisions, this is often not the case, not infrequently leading to demands for ineffective, inappropriate and prolonged interventions. In 1980 LaFollette called for the licensing of prospective parents, basing his argument on the harm they can do to vulnerable people (children). In this paper, I apply his arguments to surrogate decision-makers for cognitively incapacitated patients, rhetorically suggesting that we require potential surrogates to qualify for this position by demonstrating their ability to make reasonable and rational decisions for others. I employ this theoretical approach to argue that the loose criteria by which we authorize surrogates' generally unchallenged power should be reconsidered.

  3. International assistance. Licensing assistance project

    International Nuclear Information System (INIS)

    Aleev, A.

    1999-01-01

    Description of licensing assistance project for VATESI is presented. In licensing of unit No.1 of INPP VATESI is supported by many western countries. Experts from regulatory bodies or scientific organizations of those countries assist VATESI staff in reviewing documentation presented by INPP. Among bilateral cooperation support is provided by European Commission through Phare programme

  4. Practical issues in structuring seismic licensing and acquisition agreements

    International Nuclear Information System (INIS)

    Lawrence, M.A.

    1999-01-01

    Some issues facing the geophysical industry in the area of licensing and acquisition agreements are discussed, focusing on a very large business segment of the industry called 'non-exclusive' seismic data (commonly referred to as SPEC data). A historical perspective of the industry in the Gulf of Mexico is presented, highlighting some important aspects of data licenses. The benefits of licensing three-dimensional data to the exploration industry include: (1) economy of scale, (2) 3-D is more affordable, (3) reduced barriers to entry by independents, and (4) improved success rates and reduced risk. A list of 'SPEC' companies in the Gulf of Mexico is provided and the data licensing process is outlined. There are two basic types of seismic data use licenses. The first is for a single, one-time transaction, and the other (which is more prevalent), covers multiple use licenses contemplated over a period of time. This paper briefly outlined the meaning of some important terms usually found in a license agreement, among them ownership, rights of licensee, term, disclosure to third parties, and transfer. International 'SPEC' programs and the requirements for a successful 'SPEC' program are described. The requirements include: a stable host government, reliable, competitive system of concession offerings, long term scheduled offerings, clear, consistent, and acceptable concession terms to oil and gas companies, and consistent, fair and timely method of evaluating bids and awarding concessions. 001CA9901758

  5. Fuel licensing process for an industrial use. ATF licensing process for an industrial use - Utility's perspective

    International Nuclear Information System (INIS)

    Waeckel, Nicolas

    2013-01-01

    the reliability of the ATF rods (within the hosting FA). It is recommended to perform out-of pile endurance tests, in-pile irradiation tests (in prototypical conditions) before starting an irradiation in a commercial reactor. It is known that a single 'bad' rod failure could result in a costly premature shut-down of the NPP. If the ATF rods or assemblies are not compatible with the current NPPs fuel cores designs, the ATF concept validation will rely on MTRs irradiations only and the whole core will have to be removed before introducing the new fuel concept. This process is going to be risky and costly. In addition to finding the right ATF concept, the developers will have to address the (small and large scale) manufacturing issues, the accidental and normal operation behaviour issues (cladding, fuel pellet and their interactions with the fuel assembly structure), the economic vs. benefit vs. risk issues regarding the implementation of a new fuel concept. Defining an appropriate licensing process (new concept means new requirements and limits) is a motivating challenge. Considering the current discharge burn-ups observed in the nuclear industry (>60 Gwd/t) and the related time to get any irradiation feedback, the entire development/licensing process will be likely much longer than expected (30 years)

  6. License application approach for the California LLRW disposal facility

    International Nuclear Information System (INIS)

    Gaynor, R.K.; Romano, S.A.; Hanrahan, T.P.

    1990-01-01

    US Ecology, Inc. is the State of California's license designee to site, develop and operate a low-level radioactive waste (LLRW) disposal facility to serve member states of the Southwestern Compact. US Ecology identified a proposed site in the Ward Valley of southeastern California in March 1988. Following proposed site selection, US Ecology undertook studies required to prepare a license application. US Ecology's license application for this desert site was deemed complete for detailed regulatory review by the California Department of Health Services (DHS) in December 1989. By mutual agreement, disposal of mixed waste is not proposed pending the State of California's decision on appropriate management of this small LLRW subset

  7. Sodium fast reactor safety and licensing research plan. Volume I.

    Energy Technology Data Exchange (ETDEWEB)

    Sofu, Tanju (Argonne National Laboratory, Argonne, IL); LaChance, Jeffrey L.; Bari, R. (Brokhaven National Laboratory Upton, NY); Wigeland, Roald (Idaho National Laboratory, Idaho Falls, ID); Denman, Matthew R.; Flanagan, George F. (Oak Ridge National Laboratory, Oak Ridge, TN)

    2012-05-01

    This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

  8. Sodium Fast Reactor Safety and Licensing Research Plan

    International Nuclear Information System (INIS)

    Denman, M.; Lachance, J.; Sofu, T.; Bari, R.; Flanagon, G.; Wigeland, R.

    2015-01-01

    This paper summarizes potential research priorities for the US Department of Energy (DOE) with the intent of improving the licensability of the sodium cooled fast reactor (SFR). In support of this project, five panels were tasked with identifying potential safety related gaps in the available information, data and models needed to support the licensing of an SFR. The areas examined were sodium technology; accident sequences and initiators; source term characterization, codes and methods; and fuels and materials. It is the intent of this paper to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the applied technology access control designation from old documents. The second cross-cutting gap is the need for a robust knowledge management and preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with applied technology and knowledge management. (author)

  9. Sodium fast reactor safety and licensing research plan - Volume I

    International Nuclear Information System (INIS)

    Sofu, Tanju; LaChance, Jeffrey L.; Bari, R.; Wigeland, Roald; Denman, Matthew R.; Flanagan, George F.

    2012-01-01

    This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

  10. Looking at the licensability of System 80+ in the UK

    International Nuclear Information System (INIS)

    Molnar, C.M.

    1993-01-01

    There are today no internationally-sanctioned nuclear power plant design or licensing guidelines, or acceptance criteria, available for a standard plant design that would have multi-national regulatory acceptability. On the contrary, a diversity of national regulations govern the design and licensing of nuclear power stations around the world. When licensing a nuclear facility in this environment, it is important for all parties (utility, designer and regulator) to recognise consciously that there are numerous solutions available to satisfy varying safety requirements. There is no one right-way - there are only trade-offs justified on safety, performance benefit and cost, which, taken together, fashion designs that conform to national licensing requirements. (Author)

  11. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  12. Research and development associated with licensing of MHTGR [Modular High Temperature Gas-Cooled Reactor

    International Nuclear Information System (INIS)

    Jones, H.

    1990-01-01

    The Modular High Temperature Gas-Cooled Reactor (MHTGR) currently under development by the US Department of Energy (US-DOE) for commercial applications has top-level goals of producing safe, economical power for the US utility industry. The utility industry has been represented in formulating design and licensing requirements through both a ''Utility User Requirements Document'' and by participating in the DOE system engineering process known as the ''Integrated Approach.'' The result of this collaboration has been to set stringent goals for both the safety and operational reliability of the MHTGR. To achieve these goals, the designer must have access to a more comprehensive data base of properties in several fields of technology than is currently available. A technology development program has been planned to provide this data to the designer in time to support both his design activities and the submittal of formal licensing application documents. The US-DOE has chosen the Oak Ridge National Laboratory (ORNL) to take the lead in planning and executing these technology programs. When completed these will augment the designer's current data base and provide the necessary depth to meet the stringent goals which have been set for the MHTGR. It is worth noting that the goals of safety and operational reliability are complementary, and the data required from the technology development program will be similar. Therefore, the program to support the licensing of the MHTGR is not separate from that required for design, but is a subset of that which meets all the requirements that result from implementing the US-DOE's integrated approach. 38 figs

  13. New nuclear plant design and licensing process

    International Nuclear Information System (INIS)

    Luangdilok, W.

    1996-01-01

    This paper describes latest developments in the nuclear power reactor technology with emphasis on three areas: (1) the US technology of advanced passive light water reactors (AP600 and S BWR), (2) regulatory processes that certify their safety, and (3) current engineering concerns. The goal is to provide and insight of how the government's regulatory agency guarantees public safety by looking into how new passive safety features were designed and tested by vendors and how they were re-evaluated and retested by the US NRC. The paper then discusses the US 1989 nuclear licensing reform (10 CFR Part 52) whose objectives are to promote the standardization of nuclear power plants and provide for the early and definitive resolution of site and design issues before plants are built. The new licensing process avoids the unpredictability nd escalated construction cost under the old licensing process. Finally, the paper summarizes engineering concerns found in current light water reactors that may not go away in the new design. The concerns are related the material and water chemistry technology in dealing with corrosion problems in water-cooled nuclear reactor systems (PWRs and BWRs). These engineering concerns include core shroud cracking (BWRs), jet pump hold-down beam cracking (BWRs), steam generator tube stress corrosion cracking (PWR)

  14. 31 CFR 596.306 - License.

    Science.gov (United States)

    2010-07-01

    ... ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.306 License. Except as otherwise specified, the term license means any license or...

  15. 31 CFR 596.305 - General license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.305 General license. The term general license means any license or authorization...

  16. Role of fission gas release in reactor licensing

    International Nuclear Information System (INIS)

    1975-11-01

    The release of fission gases from oxide pellets to the fuel rod internal voidage (gap) is reviewed with regard to the required safety analysis in reactor licensing. Significant analyzed effects are described, prominent gas release models are reviewed, and various methods used in the licensing process are summarized. The report thus serves as a guide to a large body of literature including company reports and government documents. A discussion of the state of the art of gas release analysis is presented

  17. Presentation of reports for licensing of industrial irradiators

    International Nuclear Information System (INIS)

    2000-04-01

    This Regulation refers to the requirements of the Regulation CNEN-NE.6.02. 'Licensing of Radioactive Facilities', expressed in the section 6 related to the information for Previous Approval, in the subsection 7.2 related to the information for the Construction Licensing and in the subsection 9.2, related to the information for the Authorization for operation, for the specific case of industrial irradiators

  18. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  19. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  20. The road to MYRRHA. The pre-licensing phase and FEED

    International Nuclear Information System (INIS)

    2014-01-01

    The article discusses the study phase of the future research reactor MYRRHA. This study phase covers three major areas: Research and Development, licensing and engineering. In 2013, substantial progress was made in the licensing and engineering processes: licensing is currently in the pre-licensing phase, while, for engineering, the Front-end Engineering and Design (FEED) contract was signed for the construction of the non-nuclear parts of MYRRHA. The article highlights work associated with the the pre-licensing phase and the FEED.

  1. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. VEHICLES LICENSED IN SWITZERLAND

    CERN Multimedia

    Service des Relations avec les Pays-Hôtes

    2000-01-01

    1.\tVehicle licensinga)\tTime limitsVehicles must have a Swiss registration document and Swiss number plates: -\tif the owner has been residing in Switzerland for more than one year without a break of more than three consecutive months and has been using it for more than one month on Swiss territory, or -\tif the vehicle itself has been on Swiss territory for more than one year without a break of more than three consecutive months. b)\tTechnical details Vehicles belonging to non-Swiss members of the personnel who hold a carte de légitimation issued by the Swiss Federal Department of Foreign Affairs (hereinafter referred to as 'DFAE') and who were not permanently resident in Switzerland before taking up their appointment may be licensed in Switzerland with virtually no restrictions provided that their owner produces: -\tthe vehicle registration document and number plates of the country in which the car was previously registered, or -\ta manufacturer's certi...

  3. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  4. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Rønde, Thomas; Fosfuri, Andrea

    the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend upon product market performance. If licensing is decentralized, the business unit forgoes valuable...... licensing opportunities since the rewards for licensing are (optimally) weaker than those for product market profits. This distortion is stronger when production-based incentives are more powerful, making centralization more attractive. Growth of technology markets favors centralization and drives higher...

  5. FOSS License Selection and Code Management

    OpenAIRE

    Vescuso, Peter

    2011-01-01

    With nearly 2,000 free and open source software (FLOSS) licenses, software license proliferation¿ can be a major headache for software development organizations trying to speed development through software component reuse, as well as companies redistributing software packages as components of their products. Scope is one problem: from the Free Beer license to the GPL family of licenses to platform-specific licenses such as Apache and Eclipse, the number and variety of licenses make it difficu...

  6. License - RGP gmap98 | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP gmap98 License License to Use This Database Last updated : 2015/02/12 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as foll...on-Share Alike 2.1 Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this datab

  7. License - ChIP-Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us ChIP-Atlas License License to Use This Database Last updated : 2016/06/24 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...national is found here . With regard to this database, you are licensed to: freely access part or whole of this database

  8. Licensing schedule for away-from-reactor (AFR) spent fuel storage facilities

    International Nuclear Information System (INIS)

    Gray, P.L.

    1981-08-01

    The Nuclear Regulatory Commission has authority to issue licenses for Away-From-Reactor (AFR) installations for the storage of spent nuclear fuel. This report presents a detailed estimate of the time required to prosecute a licensing action. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  9. License - Nikkaji-InChI Mapping Table | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Nikkaji-InChI Mapping Table License License to Use This Database Last updated : 2015/05/22 You may use this database...ense specifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative C...ommons Attribution 2.1 Japan . If you use data from this database, please be sure attribute this database as... . With regard to this database, you are licensed to: freely access part or whole of this database, and acqu

  10. License - BodyParts3D | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us BodyParts3D License License to Use This Database Last updated : 2011/08/25 You may use this database...he license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributi...on-Share Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as foll...here . With regard to this database, you are licensed to: freely access part or whole of this database, and

  11. License - PGDBj - Ortholog DB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us PGDBj - Ortholog DB License License to Use This Database Last updated : 2017/03/07 You may use this database...cifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons A...ttribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  12. Current Requirements of the Society to the Professional Training of Specialists in Information Technology Industry in Japan

    Science.gov (United States)

    Pododimenko, Inna

    2014-01-01

    The problem of professional training of skilled human personnel in the industry of information communication technology, the urgency of which is recognized at the state level of Ukraine and the world, has been considered. It has been traced that constantly growing requirements of the labour market, swift scientific progress require the use of…

  13. Software licenses: Good fences make good neighbors

    International Nuclear Information System (INIS)

    McCreary, J.G.; Woodyard, A.

    1995-01-01

    The basis for a good contract is that it is beneficial to both parties. A good foundation will cement the responsibilities and obligations of the parties after areas of agreement have been negotiated. Unfortunately, software licenses do not always reflect what is best for all. Some clauses are definitely for the benefit of the vendor, while others are required by a prudent client. The resulting contract is then a matter of reasonable compromise to achieve a good business relationship. Major issues of warranty, liability, training, support, and payment may be in conflict. Such topics as maintenance, testing, patents, extent of use, and return of software are often overlooked or addressed unevenly. This paper addresses these subjects and provides guidelines for software licenses. An understanding of legal phrases is of value. A better understanding of the viewpoints of both the vendor and the client results in a better working relationship

  14. To License or Not to License Revisited: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    OpenAIRE

    Thomas Lonardo; Doug White; Alan Rea

    2009-01-01

    In this update to the previous year's study, the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner lice...

  15. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    at the end of 1999 when Posiva Ltd, the current implementer of the disposal programme, submitted the application for a decision-in-principle (DiP, 2000) for a spent fuel disposal facility in the Olkiluoto. The DiP was given by the government in late 2000, approved by the host municipality and ratified by the parliament in early 2001. It gave Posiva the authorisation to start to construct an underground rock characterisation facility, to the depth of the actual planned disposal, as required by regulation. The safety case to support the decision-in-principle application was compiled for 1999. The safety case included a concept description, proposed site characteristics, general facility layout and a safety assessment. The application was further supported by an environmental impact assessment report. Posiva has submitted a construction license application for a spent fuel encapsulation and disposal facility at the end of 2012. STUK is currently finalising the decisions related to the initial review phase and starting the detailed review. The preparatory phase has included among other things a systematic requirement and education programme, negotiation of framework agreements with external support experts and stepwise review of Posiva's developing safety case documents which included the draft construction license application documents. (authors)

  16. Licensing decisions and safety research related to LMFBR accidents

    International Nuclear Information System (INIS)

    Denise, R.P.; Speis, T.P.; Kelber, C.N.; Curtis, R.T.

    1977-01-01

    The licensing approach which ensures adequate protection of the public health and safety against serious accidents is described. This paper describes the role of core melt and core disruptive accidents in the design, safety research, and licensing processes, using the Clinch River Breeder Reactor (CRBR) as a focal point. Major design attention is placed on the prevention of these accidents so that the probability of core melt accidents is reduced to a sufficiently low level that they are not treated as design basis accidents. Additional requirements are placed upon the design to further reduce residual risk. This licensing process is supported by a confirmatory research program designed to provide an independent basis for licensing judgements. It has as a goal the resolution of generic safety issues prior to the establishment of a commercial LMFBR industry. The program includes accident analysis, experiments in materials interactions, aerosol transport and system integrity and planning for new safety test facilities. The problems are approached in a multi-disciplinary functional manner that identifies key safety issues and centralizes efforts to resolve them. The near term objectives of the program support the licensing of the Clinch River Breeder Reactor (CRBR) and the proposed Prototype Large Breeder Reactor (PLBR). The long term objectives of the program support the licensing of commercial LMFBRs during the late 1980's and beyond. This safety research is designed to provide an independent basis for the licensing judgements which must be made by the Nuclear Regulatory Commission

  17. Reassessing Occupational Licensing Of Tour Guides (Opinion Piece

    Directory of Open Access Journals (Sweden)

    Amir SHANI

    2017-06-01

    Full Text Available It is conventionally held that to protect tourists from incompetent and/or unscrupulous tour guides, governments should require guides to be licensed in order to legally practice their profession. Despite the implementation of such regulatory statutes in many countries, it is argued in this opinion paper that the severe drawbacks of licensing demands should be re-evaluated by both policy-makers and tourism scholars. The licensing of guides is not only an ineffective means of quality assurance, with negative consequences for many of those involved, but it also undermines the ethical foundations of a free society. Furthermore, licensing is an archaic practice for ensuring standardization among the members of a profession in a way that is no longer suitable for addressing the challenges of the tourism industry in the 21st century, in which a wide variety of specialized and innovative guided tours are offered to tourists. Although this commentary presents a firm stand against the compulsory licensing of tour guides, it should be seen as an invitation for open discussion among tourism researchers regarding the necessity of licensing tour guides in particular, and of government tourism regulation in general. Moreover, further research is needed to clarify key points on the issue of the professional licensing of tour guides.

  18. Environmental licensing issues for cogeneration plants

    International Nuclear Information System (INIS)

    Lipka, G.S.; Bibbo, R.V.

    1990-01-01

    The siting and licensing of cogeneration and independent power production (IPP) facilities is a complex process involving a number of interrelated engineering, economic, and environmental impact considerations. Important considerations for the siting and licensing of such facilities include air quality control and air quality impacts, water supply and wastewater disposal, and applicable noise criteria and noise impact considerations. Air quality control and air quality impact considerations for power generation facilities are commonly reviewed in the public forum, and most project developers are generally aware of the key air quality licensing issues. These issues include Best Available Control Technology (BACT) demonstration requirements, and air quality modeling requirements. BACT is a case-by-case determination, which causes uncertainty, in that developers have difficulty in projecting the cost of required control systems. Continuing developments in control technology may cause this problem to continue in the 1990's. Air quality modeling can be a problem in hilly terrain or within or near an urban environment, which could delay or preclude permitting of a new cogeneration or IPP facility in such locations. This paper discusses several environmental issues which are less frequently addressed than air quality issues, namely water/wastewater and noise. The design features of typical cogeneration and IPP facilities that affect water supply requirements, wastewater volumes, and noise emissions are discussed. Then, the site selection and impact review process are examined to identify typical constraints and trade-offs that can develop relative to water, wastewater, and noise issues. Trends in permit review requirements for water, wastewater, and noise are examined. Finally, innovative approaches that can be used to resolve potential development constraints for water, wastewater, and noise issues are discussed

  19. License plate recognition (phase B).

    Science.gov (United States)

    2010-06-01

    License Plate Recognition (LPR) technology has been used for off-line automobile enforcement purposes. The technology has seen mixed success with correct reading rate as high as 60 to 80% depending on the specific application and environment. This li...

  20. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  1. DOE Patents Available for Licensing

    International Nuclear Information System (INIS)

    Stuber, C.

    1981-01-01

    DOE Patents Available for Licensing (DOE PAL) provides abstracting and indexing coverage of the DOE patent literature, including patent applications, that concerns any apsect of energy production, conservation, and utilization. The citations are arranged by subject category. DOE is prepared to grant exclusive or nonexclusive, revocable licenses under DOE-owned US patents and patent applications in accordance with the provisions of 10CFR781

  2. Spatial service delivery system for smart licensing & enforcement management

    Science.gov (United States)

    Wahap, N. A.; Ismail, N. M.; Nor, N. M.; Ahmad, N.; Omar, M. F.; Termizi, A. A. A.; Zainal, D.; Noordin, N. M.; Mansor, S.

    2016-06-01

    Spatial information has introduced a new sense of urgency for a better understanding of the public needs in term of what, when and where they need services and through which devices, platform or physical locations they need them. The objective of this project is to value- add existing license management process for business premises which comes under the responsibility of Local Authority (PBT). Manipulation of geospatial and tracing technology via mobile platform allows enforcement officers to work in real-time, use a standardized system, improve service delivery, and optimize operation management. This paper will augment the scope and capabilities of proposed concept namely, Smart Licensing/Enforcement Management (SLEm). It will review the current licensing and enforcement practice of selected PBT in comparison to the enhanced method. As a result, the new enhanced system is expected to offer a total solution for licensing/enforcement management whilst increasing efficiency and transparency for smart city management and governance.

  3. Corrosion protection of Arctic offshore structures: Final report. [Effects of temperature and salinity on required cathodic protection current

    Energy Technology Data Exchange (ETDEWEB)

    Sackinger, W.M.; Rogers, J.C.; Feyk, C.; Theuveny, B.

    1985-10-01

    Results are presented for a research program on corrosion prevention for Arctic offshore structures which are in contact with sea ice for a significant portion of the year. The electrical method most adaptable for structure protection involves the injection of impressed current from several remote anodes buried just beneath the sea floor. The electrical resistivity of annual sea ice as a function of temperature and salinity is presented. Details of the interface layers formed between sea ice and steel in the presence of current injection are shown. A computer program was developed to enable the calculation of protective current density into the structure, in the presence of ice rubble and ridges around the structure. The program and the results of an example calculation are given for a caisson- retained island structure. 81 refs., 103 figs., 3 tabs.

  4. Overview of the role of economics in plant life management license renewal in the U.S

    International Nuclear Information System (INIS)

    Young, G.G.; Nelson, A.P.

    2002-01-01

    Full text: In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provides the requirements for an operating nuclear plant to seek license renewal. U.S. nuclear power plants obtain a 40-year initial operating license, but under 10 CFR Part 54, additional terms of 20-years each may be obtained through license renewal. Prior to 1995, the estimated cost just to prepare a license renewal application was about $40 million. Under the revised rule, the cost to prepare an application was reduced to about $10 million or less. Although the revised rule generated considerable interest, the decision to seek license renewal is fundamentally an economic decision. In 1995, many people believed that only a select few operating nuclear plants would pursue license renewal and that most would operate for no more than 40 years. The primary reason for this belief was that the cost of keeping U.S. nuclear plants running did not appear to be competitive with other forms of electricity generation. By 1998, the economic conditions in the U.S. were changing dramatically. Electricity deregulation was moving ahead, the need for electricity was growing, and the operating costs for nuclear power plants were declining. Also, in 1998, the first two applications for license renewal were submitted to the NRC by Baltimore Gas and Electric for the two-unit Calvert Cliffs nuclear power plant and by Duke Energy for the three-unit Oconee nuclear power plant. The U.S. nuclear industry was somewhat skeptical that the NRC could complete the license renewal process in a timely and predictable manner. This skepticism was due to the protracted and unpredictable process used by the NRC to approve the original operating licenses, especially in the 1980's and early 1990's. In March 2000, the NRC approved the renewal of the 40-year operating licenses for the two-unit Calvert Cliffs nuclear power plant for an additional 20 years. Two months later, the NRC approved the

  5. Patenting and licensing of university research: promoting innovation or undermining academic values?

    Science.gov (United States)

    Sterckx, Sigrid

    2011-03-01

    Since the 1980s in the US and the 1990s in Europe, patenting and licensing activities by universities have massively increased. This is strongly encouraged by governments throughout the Western world. Many regard academic patenting as essential to achieve 'knowledge transfer' from academia to industry. This trend has far-reaching consequences for access to the fruits of academic research and so the question arises whether the current policies are indeed promoting innovation or whether they are instead a symptom of a pro-intellectual property (IP) culture which is blind to adverse effects. Addressing this question requires both empirical analysis (how real is the link between academic patenting and licensing and 'development' of academic research by industry?) and normative assessment (which justifications are given for the current policies and to what extent do they threaten important academic values?). After illustrating the major rise of academic patenting and licensing in the US and Europe and commenting on the increasing trend of 'upstream' patenting and the focus on exclusive as opposed to non-exclusive licences, this paper will discuss five negative effects of these trends. Subsequently, the question as to why policymakers seem to ignore these adverse effects will be addressed. Finally, a number of proposals for improving university policies will be made.

  6. Does the seal licensing system in Scotland have a negative impact on seal welfare?

    Directory of Open Access Journals (Sweden)

    Laetitia Nunny

    2016-08-01

    Full Text Available This study examined the licensing system that permits seal shooting in Scotland, which was established under Part 6 Conservation of Seals of the Marine (Scotland Act 2010. Four approaches were used: data were collated and analyzed from both the Scottish Government and Scottish Marine Animal Stranding Scheme; a survey was sent to current license holders and informal interviews were conducted with key stakeholder types. Between February 2011 and the end of October 2015, 1229 gray seals and 275 common seals were reported shot under license to the Scottish Government. The numbers of seals reported as shot has reduced year-on-year since the licensing system was put in place. While some license holders, notably fish farms, were using some non-lethal forms of deterrent to reduce seal-related damage, these were often used alongside seal shooting. Of the seals reported as shot to the Scottish Government, only a small percentage were also reported to the Scottish Marine Animal Stranding Scheme, despite this being a licensing requirement. Only 2.3% of the shot gray seals and 4.5% of the shot common seals were necropsied. There is evidence from these necropsies that some seals had not died instantly or had not been shot in the manner recommended by the Scottish Seal Management Code of Practice. These preliminary results show that more carcasses need to be recovered and necropsied if the welfare implications of current seal shooting practice are to be properly assessed. The current legislation does not specify closed seasons to protect breeding seals and thirty-five per cent of necropsied seals were pregnant gray seals. Seals have also been shot during their lactation periods when pups are dependent on their mothers. This raises significant welfare concerns. The re-introduction of closed seasons specific to each species of seal is recommended along with greater effort to deploy non-lethal methods. Independent assessment of the number of seals being killed

  7. Heating and current drive requirements for ideal MHD stability and ITB sustainment in ITER steady state scenarios

    Science.gov (United States)

    Poli, Francesca

    2012-10-01

    Steady state scenarios envisaged for ITER aim at optimizing the bootstrap current, while maintaining sufficient confinement and stability to provide the necessary fusion yield. Non-inductive scenarios will need to operate with Internal Transport Barriers (ITBs) in order to reach adequate fusion gain at typical currents of 9 MA. However, the large pressure gradients associated with ITBs in regions of weak or negative magnetic shear can be conducive to ideal MHD instabilities in a wide range of βN, reducing the no-wall limit. Scenarios are established as relaxed flattop states with time-dependent transport simulations with TSC [1]. Fully non-inductive configurations with current in the range of 7-10 MA and various heating mixes (NB, EC, IC and LH) have been studied against variations of the pressure profile peaking and of the Greenwald fraction. It is found that stable equilibria have qmin> 2 and moderate ITBs at 2/3 of the minor radius [2]. The ExB flow shear from toroidal plasma rotation is expected to be low in ITER, with a major role in the ITB dynamics being played by magnetic geometry. Combinations of H&CD sources that maintain reverse or weak magnetic shear profiles throughout the discharge and ρ(qmin)>=0.5 are the focus of this work. The ITER EC upper launcher, designed for NTM control, can provide enough current drive off-axis to sustain moderate ITBs at mid-radius and maintain a non-inductive current of 8-9MA and H98>=1.5 with the day one heating mix. LH heating and current drive is effective in modifying the current profile off-axis, facilitating the formation of stronger ITBs in the rampup phase, their sustainment at larger radii and larger bootstrap fraction. The implications for steady state operation and fusion performance are discussed.[4pt] [1] Jardin S.C. et al, J. Comput. Phys. 66 (1986) 481[0pt] [2] Poli F.M. et al, Nucl. Fusion 52 (2012) 063027.

  8. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  9. 77 FR 68155 - The Armed Forces Radiobiology Research Institute TRIGA Reactor: Facility Operating License No. R-84

    Science.gov (United States)

    2012-11-15

    ... Research Institute TRIGA Reactor: Facility Operating License No. R-84 AGENCY: Nuclear Regulatory Commission... considering an application for the renewal of Facility Operating License No. R-84 (Application), which... the renewal of Facility Operating License No. R-84, which currently authorizes the licensee to operate...

  10. NRC licensing of uranium enrichment plants

    International Nuclear Information System (INIS)

    Moran, B.W.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) is preparing a rule making that establishes the licensing requirements for low-enriched uranium enrichment plants. Although implementation of this rule making is timed to correspond with receipt of a license application for the Louisiana Energy Services centrifuge enrichment plant, the rule making is applicable to all uranium enrichment technologies. If ownership of the US gaseous diffusion plants and/or atomic vapor laser isotope separation is transferred to a private or government corporation, these plants also would be licensable under the new rule making. The Safeguards Studies Department was tasked by the NRC to provide technical assistance in support of the rule making and guidance preparation process. The initial and primary effort of this task involved the characterization of the potential safeguards concerns associated with a commercial enrichment plant, and the licensing issues associated with these concerns. The primary safeguards considerations were identified as detection of the loss of special nuclear material, detection of unauthorized production of material of low strategic significance, and detection of production of uranium enriched to >10% 235 U. The primary safeguards concerns identified were (1) large absolute limit of error associated with the material balance closing, (2) the inability to shutdown some technologies to perform a cleanout inventory of the process system, and (3) the flexibility of some technologies to produce higher enrichments. Unauthorized production scenarios were identified for some technologies that could prevent conventional material control and accounting programs from detecting the production and removal of 5 kg 235 U as highly enriched uranium. Safeguards techniques were identified to mitigate these concerns

  11. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  12. 24 CFR 3286.207 - Process for obtaining installation license.

    Science.gov (United States)

    2010-04-01

    ... installation license must submit verification of the experience required in § 3286.205(a). This verification may be in the form of statements by past or present employers or a self-certification that the applicant meets those experience requirements, but HUD may contact the applicant for additional verification...

  13. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  14. Managing technology licensing for stochastic R&D: from the perspective of an enterprise information system

    Science.gov (United States)

    Hong, Xianpei; Zhao, Dan; Wang, Zongjun

    2016-10-01

    Enterprise information technology (IT) plays an important role in technology innovation management for high-tech enterprises. However, to date most studies on enterprise technology innovation have assumed that the research and development (R&D) outcome is certain. This assumption does not always hold in practice. Motivated by the current practice of some IT industries, we establish a three-stage duopoly game model, including the R&D stage, the licensing stage and the output stage, to investigate the influence of bargaining power and technology spillover on the optimal licensing policy for the innovating enterprise when the outcome of R&D is uncertain. Our results demonstrate that (1) if the licensor has low (high) bargaining power, fixed-fee (royalty) licensing is always superior to royalty (fixed-fee) licensing to the licensor regardless of technology spillover; (2) if the licensor has moderate bargaining power and technology spillover is low (high) as well, fixed-fee (royalty) licensing is superior to royalty (fixed-fee) licensing; (3) under two-part tariff licensing and the assumption of licensors with full bargaining power, if a negative prepaid fixed fee is not allowed, two-part tariff licensing is equivalent to royalty licensing which is the optimal licensing policy; if negative prepaid fixed fee is allowed, the optimal policy is two-part tariff licensing.

  15. Work Requirements in Transformation, Competence for the Future: A Critical Look at the Consequences of Current Positions. IAB Labour Market Research Topics No. 45.

    Science.gov (United States)

    Plath, Hans-Eberhard

    In Germany and elsewhere, the literature on current and future work requirements rarely discusses the effects of globalization, internationalization, computerization, and other factors from the point of view of workers. Some have suggested that a blurring of limits will be one of the main changes in work in the future. This blurring will involve…

  16. Cogeneration plants in Italy: Licensing aspects

    International Nuclear Information System (INIS)

    Buscaglione, A.

    1991-01-01

    This paper focusses on administrative/bureaucratic problems relative to the licensing of cogeneration plants in Italy. The current stumbling block appears to lie in organizational difficulties relative to the coordination of various Government authorized safety committees responsible for the drafting up of suitable legislation governing cogeneration plant fire safety aspects. The author cites the possible environmental benefits in terms of air pollution abatement that could have been had with the timely start-up of a new 7 MW plant (in Lombardia) still awaiting its go-ahead authorization

  17. Licensing process characteristics of Small Modular Reactors and spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Söderholm, Kristiina, E-mail: kristiina.soderholm@fortum.com [Fortum Power (Finland); Tuunanen, Jari, E-mail: jari.tuunanen@fortum.com [Fortum Power (Finland); Amaba, Ben, E-mail: baamaba@us.ibm.com [IBM Complex Systems (United States); Bergqvist, Sofia, E-mail: sofia.bergqvist@se.ibm.com [IBM Rational Software (Sweden); Lusardi, Paul, E-mail: plusardi@nuscalepower.com [NuScale Power (United States)

    2014-09-15

    Highlights: • We examine the licensing process challenges of modular nuclear facilities. • We compare the features of Small Modular Reactors and spent nuclear fuel repository. • We present the need of nuclear licensing simplification. • Part of the licensing is proposed to be internationally applicable. • Systems engineering and requirements engineering benefits are presented. - Abstract: This paper aims to increase the understanding of the licensing processes characteristics of Small Modular Reactors (SMR) compared with licensing of spent nuclear fuel repository. The basis of the SMR licensing process development lies in licensing processes used in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their various licensing processes and recent actions in the new NPP construction. Certain aspects of the aviation industry licensing process have also been studied and selected practices have been investigated as possibly suitable for use in nuclear licensing. Suitable features for SMR licensing are emphasized and suggested. The licensing features of the spent nuclear fuel deep repository along with similar features of SMR licensing are discussed. Since there are similar types of challenges of lengthy licensing time frames, as well as modular features to be taken into account in licensing, these two different nuclear industry fields can be compared. The main SMR features to take into account in licensing are: • Standardization of the design. • Modularity. • Mass production. • Serial construction. Modularity can be divided into two different categories: the first category is simply a single power plant unit constructed of independently engineered modules (e.g. construction process for Westinghouse AP-1000 NPP) and the second one a power plant composed of many reactor modules, which are manufactured in factories and installed as needed (e.g. NuScale Power SMR design). The deep underground repository

  18. More green infrastructure is required to maintain ecosystem services under current trends in land-use change in Europe.

    Science.gov (United States)

    Maes, Joachim; Barbosa, Ana; Baranzelli, Claudia; Zulian, Grazia; Batista E Silva, Filipe; Vandecasteele, Ine; Hiederer, Roland; Liquete, Camino; Paracchini, Maria Luisa; Mubareka, Sarah; Jacobs-Crisioni, Chris; Castillo, Carolina Perpiña; Lavalle, Carlo

    Green infrastructure (GI), a network of nature, semi-natural areas and green space, delivers essential ecosystem services which underpin human well-being and quality of life. Maintaining ecosystem services through the development of GI is therefore increasingly recognized by policies as a strategy to cope with potentially changing conditions in the future. This paper assessed how current trends of land-use change have an impact on the aggregated provision of eight ecosystem services at the regional scale of the European Union, measured by the Total Ecosystem Services Index (TESI8). Moreover, the paper reports how further implementation of GI across Europe can help maintain ecosystem services at baseline levels. Current demographic, economic and agricultural trends, which affect land use, were derived from the so called Reference Scenario. This scenario is established by the European Commission to assess the impact of energy and climate policy up to 2050. Under the Reference Scenario, economic growth, coupled with the total population, stimulates increasing urban and industrial expansion. TESI8 is expected to decrease across Europe between 0 and 5 % by 2020 and between 10 and 15 % by 2050 relative to the base year 2010. Based on regression analysis, we estimated that every additional percent increase of the proportion of artificial land needs to be compensated with an increase of 2.2 % of land that qualifies as green infrastructure in order to maintain ecosystem services at 2010 levels.

  19. Procedural Aspects of Compulsory Licensing Under TRIPS

    DEFF Research Database (Denmark)

    Wested, Jakob; Minssen, Timo

    2017-01-01

    and discussion addressed the framework and context for CL provided by the TRIPS convention. Both the specific requirements enshrined in TRIPS art 31 and the broader objectives and principles enshrined in TRIPS, e.g. transfer and dissemination of technology (art 7), protection of public health (art 8......In 2013, Indian authorities granted a compulsory license to NATCO Pharmaceuticals for a patented pharmaceutical product sold by Bayer. This decision raised several complex issues regarding the grant a CL and their consistency with the principles and objectives of TRIPS. Furthermore, in January 2017...

  20. Licensing process for the power increase

    International Nuclear Information System (INIS)

    Perez P, R.; Mamani A, Y.R.; Salgado G, J.R.

    2006-01-01

    The licensing process for the power increase of a nuclear power station is presented, this includes the description of the effective normative framework, the attributions of the one Mexican regulator organism in nuclear matter, the definition and importance of the power level of a nuclear reactor for the safety studies. Also, the types of power increase according to its magnitude, and the regulator process that it includes the scope and the detail of the required information that it should be evaluated by the one regulator organism are discussed. Finally it offers a summary of the experience that one has in Mexico for this type of processes. (Author)

  1. USNRC licensing process as related to nuclear criticality safety

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1987-01-01

    The U.S. Code of Federal Regulations establishes procedures and criteria for the issuance of licenses to receive title to, own, acquire, deliver, receive, possess, use, and initially transfer special nuclear material; and establishes and provides for the terms and conditions upon which the Nuclear Regulatory Commission (NRC) will issue such licenses. Section 70.22 of the regulations, ''Contents of Applications'', requires that applications for licenses contain proposed procedures to avoid accidental conditions of criticality. These procedures are elements of a nuclear criticality safety program for operations with fissionable materials at fuels and materials facilities (i.e., fuel cycle facilities other than nuclear reactors) in which there exists a potential for criticality accidents. To assist the applicant in providing specific information needed for a nuclear criticality safety program in a license application, the NRC has issued regulatory guides. The NRC requirements for nuclear criticality safety include organizational, administrative, and technical requirements. For purely technical matters on nuclear criticality safety these guides endorse national standards. Others provide guidance on the standard format and content of license applications, guidance on evaluating radiological consequences of criticality accidents, or guidance for dealing with other radiation safety issues. (author)

  2. Proficiency Testing for Bacterial Whole Genome Sequencing: An End-User Survey of Current Capabilities, Requirements and Priorities

    DEFF Research Database (Denmark)

    Moran-Gilad, Jacob; Sintchenko, Vitali; Karlsmose Pedersen, Susanne

    2015-01-01

    The advent of next-generation sequencing (NGS) has revolutionised public health microbiology. Given the potential impact of NGS, it is paramount to ensure standardisation of ‘wet’ laboratory and bioinformatic protocols and promote comparability of methods employed by different laboratories...... and their outputs. Therefore, one of the ambitious goals of the Global Microbial Identifier (GMI) initiative (http://​www.​globalmicrobiali​dentifier.​org/​) has been to establish a mechanism for inter-laboratory NGS proficiency testing (PT). This report presents findings from the survey recently conducted...... by Working Group 4 among GMI members in order to ascertain NGS end-use requirements and attitudes towards NGS PT. The survey identified the high professional diversity of laboratories engaged in NGS-based public health projects and the wide range of capabilities within institutions, at a notable range...

  3. Proficiency testing for bacterial whole genome sequencing: an end-user survey of current capabilities, requirements and priorities

    DEFF Research Database (Denmark)

    Moran-Gilad, Jacob; Sintchenko, Vitali; Karlsmose Pedersen, Susanne

    2015-01-01

    The advent of next-generation sequencing (NGS) has revolutionised public health microbiology. Given the potential impact of NGS, it is paramount to ensure standardisation of 'wet' laboratory and bioinformatic protocols and promote comparability of methods employed by different laboratories...... and their outputs. Therefore, one of the ambitious goals of the Global Microbial Identifier (GMI) initiative (http://www.globalmicrobialidentifier.org/) has been to establish a mechanism for inter-laboratory NGS proficiency testing (PT). This report presents findings from the survey recently conducted by Working...... Group 4 among GMI members in order to ascertain NGS end-use requirements and attitudes towards NGS PT. The survey identified the high professional diversity of laboratories engaged in NGS-based public health projects and the wide range of capabilities within institutions, at a notable range of costs...

  4. Meeting current requirements. Data security in the smart metering; Den heutigen Anforderungen gerecht werden. Datensicherheit im Smart Metering

    Energy Technology Data Exchange (ETDEWEB)

    Zayer, Peter [VOLTARIS GmbH, Maxdorf (Germany); Wolf, Frank [VOLTARIS GmbH, Merzig (Germany)

    2012-09-15

    The requirements for the smart metering are extremely complex. On the one hand, the network operators and the suppliers need unadulterated data on consumption or supply. On the other hand, consumers see their privacy jeopardized because the individual user behavior can be read from the specific energy profile. Furthermore, according to the will of the legislator the smart meter or the measuring system is an active component of a smart grid and smart-market system. Right here it is important to eliminate the threat of hacker attacks. For the industry this results in the task of guaranteeing both the maximum data security as well as to provide a maximum nutritive value to the customer.

  5. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  6. Atomic Safety and Licensing Board Panel annual report, fiscal year 1989

    International Nuclear Information System (INIS)

    Cotter, B.P. Jr.

    1990-07-01

    In Fiscal Year 1989, the Atomic Safety and Licensing Board Panel (ASLBP) handled 40 proceedings involving the construction, operation and maintenance of commercial nuclear power reactors or other activities requiring a license from the Nuclear Regulatory Commission. This report summarizes, highlights and analyzes how the wide-ranging issues raised in these proceedings were addressed by the Judges and Licensing Boards of the ASLBP during the year. 5 figs., 3 tabs

  7. Improvement suggestions on license extension management for civil nuclear safety equipment activities

    International Nuclear Information System (INIS)

    Sun Xingjian; Liu Hongji; Han Guoli; Jia Fengcai

    2013-01-01

    Based on the concepts of Clear Requirements, Comprehensive Review, Objective Assessment, Dynamic Management, this paper gives improvement suggestions on license extension management for civil nuclear safety equipment design, manufacture, installation and non-destructive examination activities, which include establishing a relatively unified license extension review standard, combining multi-views and close linking license review and supervision, full utilizing the daily supervision and inspection results, as well as further improving motivation and elimination mechanism. (authors)

  8. Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992

    International Nuclear Information System (INIS)

    1993-09-01

    In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (''the Panel'') handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel's caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel's judges and licensing boards

  9. Methodology and findings of the NRC`s materials licensing process redesign

    Energy Technology Data Exchange (ETDEWEB)

    Rathbun, P.A.; Brown, K.D.; Madera, J.R.; Moriarty, M.; Pelchat, J.M.; Usilton, W.K.; Whitten, J.E.; Vacca, P.C.

    1996-04-01

    This report describes the work and vision of the team chartered to redesign the process for licensing users of nuclear materials. The Business Process Redesign team was chartered to improve the speed of the existing licensing process while maintaining or improving public safety and to achieve required resource levels. The report describes the team`s methods for acquiring and analyzing information about the existing materials licensing process and the steps necessary to radically change this process to the envisioned future process.

  10. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  11. Commitment tracking in the licensing renewal process: A perspective

    International Nuclear Information System (INIS)

    Gurican, Gregory M.; Breslauer, Stephen K.

    1991-01-01

    The NRC's proposed 10 CFR 54 defines 'Current licensing basis' as inclusive of all licensee commitments. During the last five years, the regulatory commitment tracking group (RCTG) has been developing guidance for member utilities to track such commitments. The RCTG guidance for commitment tracking assists utilities in developing a system to store and maintain commitments related to the CLB. But a majority believe it unlikely that any one commitment tracking system will capture all commitments contained in the proposed definition of a 'Current Licencing Basis'. For future renewal applications the NRC proposes that utilities must identify and compile all licensing basis commitments. In addition, utilities 'shall maintain...(them) in an auditable and retrievable form'. Some utilities are already compiling and tracking licensing basis commitments; others are not. (author)

  12. Licensing of MAPLE reactors in Canada

    International Nuclear Information System (INIS)

    Lee, A.G.; Labrie, J.P.; Langman, V.J.

    1999-01-01

    Full text: The Operating Licence for a MAPLE reactor (i.e., a 10 MW(th), pool-type reactor), has been approved by the Atomic Energy Control Board (AECB) on August 16th, 1999. This Operating Licence has been obtained within three years of the initiation of the MDS Nordion Medical Isotopes Reactor (MMIR) project, which entails the design, construction and commissioning of two 10 MW MAPLE reactors at AECL's Chalk River Laboratories. The scope and nature of the information required by the AECB, the licensing process and highlights of the events which led to successfully obtaining the Operating Licence for the MAPLE reactor are discussed. These discussions address all phases of the licensing process (i.e., the environmental assessment in support of siting, the Preliminary Safety Analysis Report, PSAR, in support of design, procurement and construction, the Final Safety Analysis Report, FSAR, in support of commissioning and operations, and the development of suitable quality assurance subprograms for each phase). An overview of some of the unique technical aspects associated with the MAPLE reactors, and how they have been addressed during the licensing process are also provided (e.g., applying CSA N285.0, General Requirements for Pressure-Retaining Systems and Components in CANDU Nuclear Power Plants, to a small, low pressure, low temperature research reactor, confirmation of the performance of the driver fuel via laboratory and/or in-reactor testing, validation of the computer codes used to perform the safety analyses, critical parameter uncertainty assessment, full scale hydraulic testing of the performance of the design, fuel handling, human factors validation, operator training and certification). (author)

  13. Current state of nuclear fuel cycles in nuclear engineering and trends in their development according to the environmental safety requirements

    Science.gov (United States)

    Vislov, I. S.; Pischulin, V. P.; Kladiev, S. N.; Slobodyan, S. M.

    2016-08-01

    The state and trends in the development of nuclear fuel cycles in nuclear engineering, taking into account the ecological aspects of using nuclear power plants, are considered. An analysis of advantages and disadvantages of nuclear engineering, compared with thermal engineering based on organic fuel types, was carried out. Spent nuclear fuel (SNF) reprocessing is an important task in the nuclear industry, since fuel unloaded from modern reactors of any type contains a large amount of radioactive elements that are harmful to the environment. On the other hand, the newly generated isotopes of uranium and plutonium should be reused to fabricate new nuclear fuel. The spent nuclear fuel also includes other types of fission products. Conditions for SNF handling are determined by ecological and economic factors. When choosing a certain handling method, one should assess these factors at all stages of its implementation. There are two main methods of SNF handling: open nuclear fuel cycle, with spent nuclear fuel assemblies (NFAs) that are held in storage facilities with their consequent disposal, and closed nuclear fuel cycle, with separation of uranium and plutonium, their purification from fission products, and use for producing new fuel batches. The development of effective closed fuel cycles using mixed uranium-plutonium fuel can provide a successful development of the nuclear industry only under the conditions of implementation of novel effective technological treatment processes that meet strict requirements of environmental safety and reliability of process equipment being applied. The diversity of technological processes is determined by different types of NFA devices and construction materials being used, as well as by the composition that depends on nuclear fuel components and operational conditions for assemblies in the nuclear power reactor. This work provides an overview of technological processes of SNF treatment and methods of handling of nuclear fuel

  14. Development of Regulatory Technical Requirements for the Advanced Integral Type Research Reactor

    International Nuclear Information System (INIS)

    Jo, Jong Chull; Yune, Young Gill; Kim, Woong Sik; Kim, Hho Jung

    2004-01-01

    This paper presents the current status of the study on the development of regulatory technical requirements for the licensing review of an advanced integral type research reactor of which the license application is expected in a few years. According to the Atomic Energy Act of Korea, both research and education reactors are subject to the technical requirements for power reactors in the licensing review. But, some of the requirements may not be applicable or insufficient for the licensing reviews of reactors with unique design features. Thus it is necessary to identify which review topics or areas can not be addressed by the existing requirements and to develop the required ones newly or supplement appropriately. Through the study performed so far, it has been identified that the following requirements need to be developed newly for the licensing review of SMART-P: the use of proven technology, the interfacial facility, the non-safety systems, and the metallic fuels. The approach and basis for the development of each of the requirements are discussed. (authors)

  15. Development regulation regarding with licensing of nuclear installation

    International Nuclear Information System (INIS)

    Bambang Riyono; Yudi Pramono; Dahlia Cakrawati Sinaga

    2011-01-01

    Provisions of Article 17 paragraph (3) of Law Number 10 Year 1997 on Nuclear cleary mandates for the establishment of government regulations (GR) on Nuclear licensing containing the requirements and procedure, both from the standpoint of their utilization and installation. To use has been rising GR No.29 Year 2008 on the Use of Ionizing Radiation Sources and Nuclear Materials, while for the installation has been published PP No.43 Year 2006 on Nuclear Reactor Licensing, and BAPETEN Chairman Decree No.3 Year 2006 on Non-reactor Nuclear Installation Licensing. Based on the background of the preparation of both the aforementioned are just regulate the reactor and utilization, not yet fully meet the mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear, including other nuclear installations. For these reasons, it initiated the need for a separate regulation containing provisions concerning licensing of non-reactor nuclear installations. On the other side from the understanding the legal aspects and interpretations of the Law No.10 of 2004 on the Establishment Regulation Legislation, should be in single mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear would only produce one of the requirements and procedure for the use or installation, or a maximum of two (2) GR related licensing the use and installation. This is encourages conducted the assessing or studies related to how possible it is according to the legal aspect is justified to combine in one Nuclear licensing regulations regarding both the use and installation, by looking at the complexity of installation and wide scope of utilization of nuclear energy in Indonesia. The results of this paper is expected to provide input in the preparation of GR on licensing of nuclear installations. (author)

  16. Project 2019 of Garona Nuclear power plant. First project to licensing renew more than 40 years in Spain

    International Nuclear Information System (INIS)

    Fernandez, R. A.; Torralbo, J. R.

    2004-01-01

    NUCLENOR has been developing lifetime management and modernisation activities at Santa Maria de Garona NPP since the end of the 80's and the plant is now in optimum technical conditions to continue in operation beyond its original lifetime planned in the design (40 years). In the USA, the country of origin of the project, a good number of power plants with a similar design, age and history to SMG are in the process of obtaining or have already obtained, a licensing extension of up to 60 years from the NRC. In Spain, the activities required for requesting a long-term operating licensing extension include the Ageing Assessment and Management of the plant systems, structures and components, in accordance with the american regulation 10CFR54, a Radiological Impact Study for the new operating period, and an Analysis of New Legislation, not included in the licensing bases and considered to be important to safety by the CSN. With a view to obtaining a renewal of the current operating permit for the period 2009-2019, NUCLENOR has launched the Proyecto 2019, which extends to technical and licensing aspects, as it involves all the company's personnel. (Author)

  17. Licensing Process for International Projects

    International Nuclear Information System (INIS)

    Raetzke, Christan

    2014-01-01

    Christan Raetzke, lawyer, then outlined why nuclear constructions were always international projects and in which cases it would make sense to also make the licensing process be international. His law consulting firm CONLAR focuses specifically on design review so he could adequately present why an international process would make a lot of sense without being a loss of sovereignty

  18. Licensed fuel facility status report

    International Nuclear Information System (INIS)

    1990-04-01

    NRC is committed to the periodic publication of licensed fuel facilities inventory difference data, following agency review of the information and completion of any related NRC investigations. Information in this report includes inventory difference data for active fuel fabrication facilities possessing more than one effective kilogram of high enriched uranium, low enriched uranium, plutonium, or uranium-233

  19. Licensed fuel facility status report

    International Nuclear Information System (INIS)

    Joy, D.; Brown, C.

    1993-04-01

    NRC is committed to the periodic publication of licensed fuel facilities inventory difference data, following agency review of the information and completion of any related NRC investigations. Information in this report includes inventory difference data for active fuel fabrication facilities possessing more than one effective kilogram of high enriched uranium, low enriched uranium, plutonium, or uranium-233

  20. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    International Nuclear Information System (INIS)

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-01-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  1. The licensing process of the design modifications of Cernavoda 2 NPP resulting from the operating experience of CANDU plants

    International Nuclear Information System (INIS)

    Goicea, L.

    2005-01-01

    The CANDU 6 plant now under construction in Cernavoda include over two hundred significant improvements made in order to comply with current codes and standards and licensing requirements relative to the operating CANDU 6 in Romania. These evolutionary improvements are incorporated in CANDU 6 design taking advance of CANDU operating experience, of the designer company research and development and technical advances worldwide in order to further enhance safety, reliability and economics. This paper gives a general idea of the evaluation of the modifications of the Cernavoda 2 nuclear power plant against the design of Cernavoda 1 and states the safety principles and requirements which are the basis for this evaluation. (author)

  2. 75 FR 53704 - Prospective Grant of Exclusive License: Use of Pentosan Polysulfate To Treat Certain Conditions...

    Science.gov (United States)

    2010-09-01

    ... the treatment of interstitial fibrosis. The current technology builds on the surprising discovery that... comments and/or application for a license which are received by the NIH Office of Technology Transfer on or... Vepa, PhD, J.D., Licensing and Patenting Manager, Office of Technology Transfer, National Institutes of...

  3. Career Motivation in Newly Licensed Registered Nurses: What Makes Them Remain

    Science.gov (United States)

    Banks, Zarata Mann; Bailey, Jessica H.

    2010-01-01

    Despite vast research on newly licensed registered nurses (RNs), we don't know why some newly licensed registered nurses remain in their current jobs and others leave the nursing profession early in their career. Job satisfaction, the most significant factor emerging from the literature, plays a significant role in nurses' decisions to remain in…

  4. 77 FR 22362 - Exemption Requests for Special Nuclear Material License SNM-362, Department of Commerce...

    Science.gov (United States)

    2012-04-13

    ... Nuclear Material License SNM-362, Department of Commerce, Gaithersburg, MD AGENCY: Nuclear Regulatory... Commerce, National Institutes of Standards and Technology (NIST) in Gaithersburg, Maryland. NIST requested... within the Department of Commerce. The SNM license was renewed in 1979, 1985, 1991, and 1997. The current...

  5. 77 FR 29668 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2012-05-18

    ... there are only three known A subtypes of influenza viruses (H1N1, H1N2, and H3N2) currently circulating... for Detection and Subtyping of Human Influenza Viruses Description of Technology: Available for licensing and commercial development are a novel influenza virus microarray and methods for using the...

  6. Licensing and decommissioning of nuclear installations in Japan

    International Nuclear Information System (INIS)

    Shimoyama, Shunji.

    1986-01-01

    The present report discusses the current status of Japan's licensing system and legislation concerning reactor decommissioning operations. Besides Japan is working to promote worldwide nuclear safety research. However, developing nuclear safety regulations that are uniformely applicable is a difficult job due to big differences in geographical, political, economical, and technological conditions. (CW) [de

  7. License - MicrobeDB.jp | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us MicrobeDB.jp License License to Use This Database Last updated : 2017/06/29 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database... Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, yo

  8. License - TMBETA-GENOME | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMBETA-GENOME License License to Use This Database Last updated : 2015/03/09 You may use this database... the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribu...tion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as f....1 Japan . The summary of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database

  9. License - NBDC NikkajiRDF | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us NBDC NikkajiRDF License License to Use This Database Last updated : 2015/05/29 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution 2.1 Japan . If you use data from this database, please be sure attribute this database as follows: NB... the Creative Commons Attribution 2.1 Japan is found here . With regard to this database

  10. License - KAIKOcDNA | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us KAIKOcDNA License License to Use This Database Last updated : 2014/10/08 You may use this database... license terms regarding the use of this database and the requirements you must follow in using this database...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as follo...e Alike 2.1 Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this database..., and acquire data; freely redistribute part or whole of the data from this database; a

  11. License - D-HaploDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us D-HaploDB License License to Use This Database Last updated : 2011/08/25 You may use this database... license terms regarding the use of this database and the requirements you must follow in using this database...-Share Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follow...ry of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database..., you are licensed to: freely access part or whole of this database, and acquire dat

  12. License - TogoTV | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TogoTV License License to Use This Database Last updated : 2017/05/12 You may use this database...cense terms regarding the use of this database and the requirements you must follow in using this database. The license for this data...0 International . If you use data from this database, please be sure attribute this database as follows: Tog...on 4.0 International is found here . With regard to this database, you are licens...ed to: freely access part or whole of this database, and acquire data; freely redistribute part or whole of the data from this databa

  13. Management of the licensing of users of radioactive materials should be improved

    International Nuclear Information System (INIS)

    1976-01-01

    Radioactive material licenses are required for manufacturing nuclear fuel for reactors and for industrial, commercial, medical, and educational uses of radioactive materials. This type of license is not for constructing or operating nuclear power reactors and facilities for processing used nuclear fuels. This report discusses the need for better management improvements in the NRC's program for licensing the users. As of December 31, 1974, there were 8,253 active NRC-issued material licenses held by 6,310 licensees. The study reviewed NRC's policies, procedures, and practices, and examined recent evaluations of state programs to identify problems encountered by the states

  14. License - DB-SPIRE | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us DB-SPIRE License License to Use This Database Last updated : 2017/02/16 You may use this database...license terms regarding the use of this database and the requirements you must follow in using this database...Share Alike 4.0 International . If you use data from this database, please be sure attribute this database a...eative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, you a...re licensed to: freely access part or whole of this database, and acquire data; freely redistribute part or

  15. License - RED II INAHO | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RED II INAHO License License to Use This Database Last updated : 2016/01/14 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...of the Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  16. License - SKIP Stemcell Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us SKIP Stemcell Database License License to Use This Database Last updated : 2017/03/13 You may use this database...specifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Common...s Attribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...al ... . The summary of the Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  17. License - RGP gmap2000 | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP gmap2000 License License to Use This Database Last updated : 2015/03/10 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as fo...y of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, yo

  18. License - Arabidopsis Phenome Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Arabidopsis Phenome Database License License to Use This Database Last updated : 2017/02/27 You may use this database...cense specifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative ...Commons Attribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, you ar

  19. License - Togo Picture Gallery | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Togo Picture Gallery License License to Use This Database Last updated : 2017/05/16 You may use this database...ecifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons ...Attribution 4.0 International . If you use data from this database, please be sure attribute this database a...e Creative Commons Attribution 4.0 International is found here . With regard to this database

  20. License - RGP estmap2001 | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP estmap2001 License License to Use This Database Last updated : 2015/04/02 You may use this database...s the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attrib...ution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as ... the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, you ar

  1. Aging management review for license renewal and plant life management

    International Nuclear Information System (INIS)

    Rinckel, M.A.; Young, G.G.

    2002-01-01

    Full text: United States nuclear power plants are initially licensed for a period of 40-years. The 40-year term, which was established by the Atomic Energy Commission in the 1950s, is believed to be based on engineering judgement and is consistent with the typical amortization schedule for purchasing fossil power plants. Under 10 CFR Part 54, the license renewal rule, additional terms of 20-years may be obtained through the preparation of a license renewal application that must be reviewed and approved by the Nuclear Regulatory Commission (NRC). The license renewal rule requires that applicants perform ageing management reviews on passive long-lived structures and components to demonstrate that ageing will be managed during the period of extended operation (i.e., additional 20 years of operation). ageing of active components, which are excluded from 10 CFR Part 54, is accomplished through the Maintenance Rule, 10 CFR Part 65, using performance-based monitoring. The license renewal rule, 10 CFR Part 54, was initially published in 1991. After significant interaction with the nuclear industry from 1991 through 1994, the NRC revised the rule in 1995 to focus on passive long-lived structures and components. In 1998, the first two applications for license renewal were submitted to the NRC by Baltimore Gas and Electric for the two-unit Calvert Cliffs nuclear power plant and by Duke Energy for the three-unit Oconee nuclear power plant. In March 2000, the NRC approved the application for the two-unit Calvert Cliffs nuclear power plant for an additional 20 years. Two months later, the NRC approved the renewal of the operating licenses for the three-unit Oconee nuclear station. The NRC completed these reviews in a timely, predictable, and stable manner. As of February 2002, the NRC has approved renewal of operating licenses for eight nuclear units and has applications under review for 15 more units. Twelve additional companies have notified the NRC of their intention to seek

  2. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM) in terms of socio-demographics, work profiles, and injury rates.

    Science.gov (United States)

    Calys-Tagoe, Benedict N L; Clarke, Edith; Robins, Thomas; Basu, Niladri

    2017-11-06

    Artisanal and small-scale gold mining (ASGM) represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention) as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months). Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events) and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73%) when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years) versus 5.0 (62 injuries in 1250 person-years) in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years) versus an un-licensed mine (6.1 per 100 person years). These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed site. The findings suggest that certain working

  3. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM in terms of socio-demographics, work profiles, and injury rates

    Directory of Open Access Journals (Sweden)

    Benedict N. L. Calys-Tagoe

    2017-11-01

    Full Text Available Abstract Background Artisanal and small-scale gold mining (ASGM represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. Methods In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Results Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months. Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73% when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years versus 5.0 (62 injuries in 1250 person-years in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years versus an un-licensed mine (6.1 per 100 person years. Conclusions These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed

  4. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  5. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N. [Pacific Northwest Lab., Richland, WA (United States)

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  6. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report

    International Nuclear Information System (INIS)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ''green field'' condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities

  7. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

    International Nuclear Information System (INIS)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the '978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ''green field'' condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities

  8. Guide to request license for teletherapy practice

    International Nuclear Information System (INIS)

    2000-01-01

    In this work the steps to request license for teletherapy practice are described , among these steps they it continued it plows to request the qualified personnel's yams, the operation authorization, application purpose, license type

  9. List of Nuclear Materials Licensing Actions Received

    Data.gov (United States)

    Nuclear Regulatory Commission — A catalog of all Materials Licensing Actions received for review. The catalog lists the name of the entity submitting the license application, their city and state,...

  10. 10 CFR 51.22 - Criterion for categorical exclusion; identification of licensing and regulatory actions eligible...

    Science.gov (United States)

    2010-01-01

    ... requirements. (11) Issuance of amendments to licenses for fuel cycle plants and radioactive waste disposal.... (xii) Acceptance of packaged radioactive wastes from others for transfer to licensed land burial... the following types of activities: (i) Distribution of radioactive material and devices or products...

  11. 75 FR 6301 - Revisions to License Exception GOV To Provide Authorization for Exports and Reexports of...

    Science.gov (United States)

    2010-02-09

    ... of the United States, Russia, Japan, Canada, Europe and Italy. (The Italian Space Agency has separate... subject to a license requirement when exported or reexported to Russia. However, even when BIS license... unexpected delays in a launch schedule, such as for mechanical failures in a launch vehicle or weather...

  12. 76 FR 45695 - Notice and Recordkeeping for Use of Sound Recordings Under Statutory License

    Science.gov (United States)

    2011-08-01

    ... operating under these licenses are required to, among other things, pay royalty fees and report to copyright... LIBRARY OF CONGRESS Copyright Royalty Board 37 CFR Parts 370 and 382 [Docket No. RM 2011-5] Notice and Recordkeeping for Use of Sound Recordings Under Statutory License AGENCY: Copyright Royalty Board...

  13. Aspects of the licensing procedures for enrichment reduction in research reactors

    International Nuclear Information System (INIS)

    Krull, W.

    1983-01-01

    The enrichment reduction for research reactors requires a licensing procedure. For this purpose the qualification of the new fuel has to be demonstrated and changes in reactor safety have to be investigated like reactivity values, form-factors, Pu- and fission product inventory, safety margins and accidents. Calculations should be partly experimentally verified. The possible extent of the licensing procedure is discussed. (orig.) [de

  14. 78 FR 46255 - Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction

    Science.gov (United States)

    2013-07-31

    ... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear... nuclear power plant. Compliance with the provisions of the rule is required by June 20, 2014. This... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to...

  15. Methodology for LOCA analysis and its qualification procedures for PWR reload licensing

    International Nuclear Information System (INIS)

    Serrano, M.A.B.

    1986-01-01

    The methodology for LOCA analysis developed by FURNAS and its qualification procedure for PWR reload licensing are presented. Digital computer codes developed by NRC and published collectively as the WREM package were modified to get versions that comply to each requirement of Brazilian Licensing Criteria. This metodology is applied to Angra-1 basic case to conclude the qualification process. (Author) [pt

  16. 37 CFR 370.2 - Notice of use of sound recordings under statutory license.

    Science.gov (United States)

    2010-07-01

    ... BOARD, LIBRARY OF CONGRESS NOTICE AND RECORDKEEPING REQUIREMENTS FOR STATUTORY LICENSES NOTICE AND... gain access to the online Web site or homepage of the Service, or where information may be posted under... obtained from the Copyright Office or to: Library of Congress, Copyright Office, Licensing Division, 101...

  17. 6 CFR 37.19 - Machine readable technology on the driver's license or identification card.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Machine readable technology on the driver's..., Verification, and Card Issuance Requirements § 37.19 Machine readable technology on the driver's license or identification card. For the machine readable portion of the REAL ID driver's license or identification card...

  18. 76 FR 59410 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2011-09-26

    ...: Licensing information and copies of the U.S. patent applications listed below may be obtained by writing to...-402-0220. A signed Confidential Disclosure Agreement will be required to receive copies of the patent... to menopause, birth control, menstrual cycle/amenorrhea, fertility or endometriosis. Competitive...

  19. 75 FR 51823 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-08-23

    ...: Licensing information and copies of the U.S. patent applications listed below may be obtained by writing to.../402-0220. A signed Confidential Disclosure Agreement will be required to receive copies of the patent... infertility and irregular menstrual periods than in healthy women. The discovery of MATER as an important...

  20. 32 CFR 746.7 - Limited exclusive license.

    Science.gov (United States)

    2010-07-01

    ... the market and recoup his reasonable costs in so doing. (4) The license shall require the licensee to... within a longer period as approved by the Chief of Naval Research, and to continue to make the benefits... expend a specified minimum amount of money and/or take other specified actions, within a specified period...