WorldWideScience

Sample records for contractor personnel

  1. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  2. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 2804.470 Contractor...

  3. Assuring the competence of nuclear power plant contractor personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  4. Assuring the competence of nuclear power plant contractor personnel

    International Nuclear Information System (INIS)

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  5. Report: Management Alert - EPA Has Not Initiated Required Background Investigations for Information Systems Contractor Personnel

    Science.gov (United States)

    Report #17-P-0409, September 27, 2017. Not vetting contractor personnel before granting them network access exposes the EPA to risks. Contractor personnel with potentially questionable backgrounds who access sensitive agency data could cause harm.

  6. 78 FR 13547 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel

    Science.gov (United States)

    2013-02-28

    ... Contractor Personnel AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... (FY) 2009 and expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Effective February 28, 2013. FOR FURTHER INFORMATION...

  7. 75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel

    Science.gov (United States)

    2010-12-30

    ... 9000-AL60 Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY... requirement of collecting from contractors all forms of Government-provided identification once they are no...D Inspector General Audit Report No. D-2009-005, entitled ``Controls Over the Contractor Common...

  8. Reforming the American Military Officer Personnel System: Addendum: Thoughts on Contractors

    Science.gov (United States)

    2016-05-24

    public funds it receives are based on the number of government employees working at China Lake. The contractors do not mind paying the tax since it is...Management and Budget (OMB) and Congress have placed upon federal agencies. They are doing work that traditionally has been done by federal employees ...October 30, 2009. This directive says, “core personnel will not engage in inherently governmental activities.” It then lists a number of situations

  9. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Science.gov (United States)

    2010-10-01

    ... otherwise provided in the contract, the Contractor accepts the risks associated with required contract... are medically and physically fit and have received all required vaccinations. (iii) All personnel have...

  10. Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies.

  11. 78 FR 65244 - Defense Federal Acquisition Regulation Supplement: Contractor Personnel Supporting U.S. Armed...

    Science.gov (United States)

    2013-10-31

    ... it with the changes in applicability, terminology, and other revisions made by Department of Defense..., terminology aid in determining which groups qualify for different types of Government support and are based on.... In the past, the provision of non-emergency medical and dental care to CAAF personnel has generated...

  12. DOE Technical Standards List. Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    This is a periodic report on the level of agency participation in non-Government standards activities. This technical standards list is intended to assist US Department of Energy (DOE) management and other personnel involved in the DOE technical Standards Program by identifying those participating individuals. The body of this document contains a listing of DOE employees and DOE contractors who have submitted a Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies. Appendices to this document are provided to list the information by parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees.

  13. Training and certification of the personnel of gas distribution pipe-laying contractor companies in Spain; Formation et certification du personnel des contracteurs pour la pose des gazoducs en Espagne

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    Since the end of the 1980's, the Spanish gas sector has been experiencing a strong rate of growth of consumption, extension of transportation and distribution networks, and numbers of customers, especially in the domestic and commercial market. Polyethylene is playing a primordial rote in the growing extension of distribution networks in Spain, being the material by far the most widely used both in terms of extension of the network and replacement of obsolete materials. For Spanish gas distribution companies, carrying out this extension of the transportation and distribution network is a primordial objective in order to reach and lay gas supplies on to new towns, with the highest levels of quality and safety. This payer describes the personnel certification work on the gas distribution pipe-laying contractor companies carried out by Sedigas within the framework of the requirements of the standard ISO 45013, on certification of personnel. (author)

  14. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information by the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this technical standards list are those recorded as of May 1, 1999.

  15. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document and to DOE Order 1300.2A. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information by the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this TSL are those recorded as of July 1, 1996.

  16. Contractor management

    NARCIS (Netherlands)

    Ustailieva, E.; Starren, A.

    2013-01-01

    Companies function more and more in networks (i.e. contractor chains with contractors, suppliers and/or other companies. This asks for several companies/parties to work together to get the work done. Working in contractor chains is very common in sectors like maintenance, construction, cleaning, and

  17. 48 CFR 1602.170-4 - Contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  18. Contractor safety

    International Nuclear Information System (INIS)

    Blanton, M.L.; Montgomery, E.W.

    1991-01-01

    The recent trend in the United States and Shell Oil Company EandP has been to increase use of contractors to do specialized work. Many companies now use contractors almost exclusively for operations such as drilling, well workovers, construction, and many specialty and routine maintenance tasks. Today, approximately 75% of Shell Oil Company's actual operating work force in EandP is contract. Clearly, HSandE considerations must become an increasingly important part of the contractor selection process. This paper reports on the Shell Oil Company's evolution from a bidder selection process to a program of Matching Owner and Contractor. Well has begun to expand efforts to make better assessments of contractor's HSandE capabilities and values in pre-bid considerations. Focus is on pre-bid evaluations to select contractors that have strong HSandE commitments and values. Contractor safety performance in this industry must be brought up to the same standards as operating companies. In Shell Oil EandP is only willing to contractors who can and are willing to do that

  19. Personnel Investigations and Clearance Tracking (OPI)

    Data.gov (United States)

    Office of Personnel Management — Security file-related information for the U.S. Office of Personnel Management (OPM)'s employee and contractor personnel. The data is OPM-specific, not government-wide.

  20. The morphological changes of mucous membrane of stomach and duodenum of contractor organization personnel, which works in radiation hazard conditions at the object Shelter of Chornobyl NPP.

    Science.gov (United States)

    Sushko, V O; Nezgovorova, G A; Degtjarova, L V; Kolosynska, O O; Gromadska, V M

    2015-12-01

    Аim: The determination of morphological features of stomach and duodenum mucous of membrane (MM) damage at a personnel that works in radiation hazard conditions at the object of "Shelter" of Chornobyl NPP (OS) by the endoscopic monitoring with biopsy material inspection from a gastro-duodenal zone on the stages of check - in (InC) and the special medical control (SpC). the complex clinical-endoscopic and morphological examination with the biopsy of MM of stomach and duodenum in 126 workers of OS (man in the age from 20 to 59) was carried out. Doses of external radiation exposure were from 0,14 to 79,6 mSv, доза internal radiation exposure were from 0,1 to 3 mSv/Results: For the personnel of OS contract organisations differently directed pathomorphological changes of MM at InC and increase of frequency of their exposure at an inspection during SC, that generally correspond to chronic H.pylori-associated pangastritis with violation of microcirculation and trophism, disregeneration changes of epithelial layer. for the personnel of contract organizations, which participated in radiation hazard works on ОS a presence of chronic H.pylori-associated pangastritis with the increase of frequency of atrophic changes of MM (nonmetaplastic or metaplastic type) and development of erosive-ulcerous defects of gastro-duodenal zone was founded out.For workers, who had previous influence of ionizing irradiation the greater frequency of disregeneration (hyperplasia / intestinal metaplasia) changes of epithelium that accordingly promotes the risk of neoplasmes transformations was clarified.Providing of EGDFS (at a necessity with the biopsy of MM) is at InC and next stages of medical control for personnel, that executes radiation hazard works on ОS is the highly informative evidential and necessary method of inspection for determination of form and degree of pathological changes of overhead departments of gastrointestinal tract for warning of progress of disease and development

  1. Appeals - Redetermination by a Medicare Contractor

    Data.gov (United States)

    U.S. Department of Health & Human Services — A redetermination is an examination of a claim by the fiscal intermediary (FI), carrier, or Medicare Administrative Contractor (MAC) personnel who are different from...

  2. Contractor evaluations in the contractor selection process.

    Science.gov (United States)

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  3. 77 FR 14490 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor...

    Science.gov (United States)

    2012-03-12

    ... Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel (DFARS Case... (DFARS) to expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Comment Date: Comments on the proposed rule should be...

  4. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  5. 48 CFR 1646.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  6. 75 FR 28771 - Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor...

    Science.gov (United States)

    2010-05-24

    ... Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor Personnel AGENCIES... of collecting from contractors all forms of Government provided identification once they are no..., titled Controls Over the Contractor Common Access Card (CAC) Life Cycle, was performed to determine...

  7. Training of maintenance personnel

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture precises the method and means developed by EDF to ensure the training of maintenance personnel according to their initial educational background and their experience. The following points are treated: General organization of the training for maintenance personnel in PWR and GCR nuclear power stations and in Creys Malville fast breeder reactor; Basic nuclear training and pedagogical aids developed for this purpose; Specific training and training provided by contractors; complementary training taking into account the operation experience and feedback; Improvement of velocity, competence and safety during shut-down operations by adapted training. (orig.)

  8. Contractor Software Charges

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... Examples of computer software costs that contractors charge through indirect rates are material management systems, security systems, labor accounting systems, and computer-aided design and manufacturing...

  9. Technical guidelines for personnel dosimetry calibrations

    International Nuclear Information System (INIS)

    Roberson, P.L.; Fox, R.A.; Hadley, R.T.; Holbrook, K.L.; Hooker, C.D.; McDonald, J.C.

    1983-01-01

    A base of technical information has been acquire and used to evaluate the calibration, design, and performance of selected personnel systems in use at Department of Energy (DOE) facilites. A technical document was prepared to guide DOE and DOE contractors in selecting and evaluating personnel dosimetry systems and calibration. A parallel effort was initiated to intercompare the adiological calibrations standards used to calibrate DOE personnel dosimeters

  10. Personnel monitoring

    International Nuclear Information System (INIS)

    1965-01-01

    This film stresses the need for personnel monitoring in work areas where there is a hazard of exposure to radiation. It illustrates the use of personnel monitoring devices (specially the film dosimeter), the assessment of exposure to radiation and the detailed recording of the results on personnel filing cards

  11. Personnel monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-12-31

    This film stresses the need for personnel monitoring in work areas where there is a hazard of exposure to radiation. It illustrates the use of personnel monitoring devices (specially the film dosimeter), the assessment of exposure to radiation and the detailed recording of the results on personnel filing cards

  12. Private Security Contractors in Iraq: Background, Legal Status, and Other Issues

    National Research Council Canada - National Science Library

    Elsea, Jennifer K; Schwartz, Moshe; Nakamura, Kennon H

    2008-01-01

    .... In Iraq, private firms known as Private Security Contractors (PSCs) serve to protect individuals, transport convoys, forward operating bases, buildings, and other economic infrastructure, and are training Iraqi police and military personnel...

  13. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  14. Contractor Selection in Saudi Arabia

    OpenAIRE

    M. A. Bajaber; M. A. Taha

    2012-01-01

    Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few ...

  15. Defense Primer: DOD Contractors

    Science.gov (United States)

    2017-02-10

    functions, from intelligence analysis or software development to landscaping or food service. Why does DOD use individual contractors? Going back to...that provide professional services, from research to management support. The bulk of contractors—more than 70%—provide products, and these include...10 U.S.C. Part IV: Service, Supply, and Procurement. CRS Products CRS In Focus IF10548, Defense Primer: U.S. Defense Industrial Base, by Daniel

  16. Hydrogen Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  17. Information for contractors' staff

    CERN Multimedia

    The Dosimetry Service

    2005-01-01

    We have observed a significant decrease in the number of completed Certificates for Work in Controlled Radiation Areas being submitted with applications for dosimeters for your staff. Henceforth, we shall no longer be able to issue dosimeters without a certificate, which must be signed by the employee and the contractor's radiation-protection expert. You can obtain the certificate form from the Dosimetry Service at Building 24/E-011 or from our Website: http://service-rp-dosimetry.web.cern.ch/service-rp-dosimetry/. Thank you for your understanding. The Dosimetry Service

  18. Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Arguello, Bryan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-05-01

    This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

  19. Site contractor participation in the DOE SWEIS process at Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass, A.; Garvey, D.

    1997-12-01

    The U.S. Department of Energy (DOE) prepares site-wide environmental impact statements (SWEIS) on sites that are to remain in operation in order to provide an estimate of the cumulative environmental impacts from projected future operations at the site. DOE has relied on outside contractors rather than the site management and operating (M&O) contractors to prepare EISs, in order to preclude the potential for conflict of interest. The site M&O contractors, who know the potential for conflict of interest. The site M&O contractors, who know the site best and are most familiar with existing information, are critical support for the contractor. The University of California (UC) is the site M&O contractor for Los Alamos National Laboratory (LANL) in Los Alamos, NM. The role of LANL (UC) personnel in DOE`s preparation process for the LANL SWEIS is described. 3 refs.

  20. Operator/contractor relationships

    International Nuclear Information System (INIS)

    Smith, J.R.; Kidwell, C.K.; Unger, V.E.; Fercho, E.; Helmer, C.M.

    1992-01-01

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  1. Personnel Preparation.

    Science.gov (United States)

    Fair, George, Ed.; Stodden, Robert, Ed.

    1981-01-01

    Three articles comprise a section on personnel preparation in vocational education. Articles deal with two inservice programs in career/vocational education for the handicapped and a project to train paraprofessionals to assist special educators in vocational education. (CL)

  2. From demand driven contractor selection towards value driven contractor selection

    NARCIS (Netherlands)

    Walraven, A.R.; Vries, de B.

    2009-01-01

    The procurement of a construction contractor should consider more aspects than only cost or price. Taking value and price into account to select the ‘best value for money’ bid results in adopting a structured multicriteria approach. An alternative contractor selection method is presented, which

  3. Military Contractors - Too Much Dependence

    National Research Council Canada - National Science Library

    Hill, Nathan E

    2008-01-01

    .... There is undoubtedly a need for military contractors and there are numerous positive arguments in their favor. However, the negative arguments have not been highlighted enough recently and the scales are now out of balance. The intent of this research paper is to encourage the U.S. military to rebalance the scales and curb the over-reliance on contractors.

  4. 48 CFR 1845.502 - Contractor responsibility.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  5. Program Evaluation: A Consumer Evaluation of Alternative Contractor Concepts in Government Food Service

    Science.gov (United States)

    1974-09-01

    food service facilities. The food factors (quality, variety, and quantity, in that order) were generally rated by consumers as most serious problems, in keeping with many previous survey studies of military food service system. The contractor food service concept with raw food provided by the contractor, as exemplified by Fort Myer, significantly reduced consumer problems in food service personnel, speed, hours, environment, and convenience of location, and also reduced the degree to which food variety,

  6. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  7. ACED Federal Grant Contractor Tracking

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Dataset includes grant, project, and contractor awarded which are tracked for ensuring Davis-Bacon Act compliance where applicable. The 1931 Davis-Bacon Act...

  8. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  9. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  10. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  11. Development of personnel exposure management system with personal computer

    International Nuclear Information System (INIS)

    Yamato, Ichiro; Yamamoto, Toshiki

    1992-01-01

    In nuclear power plants, large scale personnel exposure management systems have been developed and established by utilities. Though being common in the base, the implementations are specific by plants. Contractors must control their workers' exposures by their own methods and systems. To comply with the utilities' parental systems, contractors' systems tend to differ by plants, thus make it difficult for contractors to design a standard system that is common to all relevant plants. Circumstances being as such, however, we have developed a system which is applicable to various customer utilities with minimal variations, using personal computers with database management and data communication softwares, with relatively low cost. We hope that this system will develop to the standard model for all Japanese contractors' personnel exposure management systems. (author)

  12. 76 FR 39015 - Contractor Performance Information

    Science.gov (United States)

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  13. 49 CFR 199.115 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  14. 48 CFR 46.105 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  15. 49 CFR 199.245 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  16. 7 CFR 1726.27 - Contractor's bonds.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  17. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Science.gov (United States)

    2010-10-01

    ... direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System... contractor (Spain). As prescribed in 229.402-70(d), use the following clause: Status of Contractor as a Director Contractor (Spain) (JUN 1997) (a) “Direct Contractor,” as used in this clause, means an individual...

  18. Private Security Contractors in Darfur

    DEFF Research Database (Denmark)

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization....... It underlines that governance is increasingly taking place through a set of (quasi-) markets, it is marked by entrepreneurial values, and a hands off approach to governance. We then discuss the way this overall change is reflected in and reinforced by the role of private security contractors in Darfur. Drawing...... at these processes is necessary to understand the role of private security contractors in Darfur. But more than this, practices in Darfur entrench neo-liberal governmentality in security more generally. The managerial and `de-politicizing' approach to security in Darfur displaces alternative views not only...

  19. Fiscal Liability of State Contractors

    Directory of Open Access Journals (Sweden)

    Santiago Fajardo-Peña

    2017-06-01

    Full Text Available The State contract is one of the most important tools for public management. The formation, execution and liquidation of State contracts are also a potential cause of State patrimonial damages. Perhaps for this reason, many State contractors are prosecuted as if they were public spending managers. The question, however, is not as simple. The fiscal liability process has a qualified recipient: the fiscal manager. In this article, through a conceptual exposition and a case study, we identify the criterion for determining in which cases a State contractor acquires the function of controlling public funds and when he/she can be subjected to a fiscal liability.

  20. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  1. Private Military and Security Contractors

    DEFF Research Database (Denmark)

    In Private Military and Security Contractors: Controlling the Corporate Warrior a multinational team of 16 scholars and a practitioner from political science, sociology, and law address a developing phenomenon: controlling the use of privatized force by states in international politics. Robust...

  2. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  3. Military Contractors - Too Much Dependence

    Science.gov (United States)

    2008-03-19

    promotes integrity, physical strength, health, unity, cooperation and teamwork. It combats stereotyping and sexual harassment. It fosters in its...weeklyreport108-000001337290&type= toc &num=115&; accessed 15 Jan 2008. 20 U.S. Department of the Army, Contractors on the Battlefield, Field Manual 3

  4. Process waste assessment approach, training and technical assistance for DOE contractors

    International Nuclear Information System (INIS)

    Pemberton, S.

    1994-03-01

    The Department of Energy (DOE) and its contractors are faced with a large waste management problem as are other industries. One of the tools used in a successful waste minimization pollution prevention (WMin/P2) program is a process waste assessment (PWA). The purpose of this project was to share the Kansas City Plant's (KCP's) PWA expertise with other DOE personnel and DOE contractors. This consisted of two major activities: (1) The KCP's PWA graded approach methodology was modified with the assistance of DOE/Defense Program's laboratories, and (2) PWA training and technical assistance were provided to interested DOE personnel and DOE contractors. This report documents the FY93 efforts, lesson learned, and future plans for both PWA-related activities

  5. 78 FR 11164 - Policy on Contractor Profits

    Science.gov (United States)

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  6. 48 CFR 725.703 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  7. 48 CFR 1609.471 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  8. 48 CFR 33.207 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  9. 40 CFR 35.6600 - Contractor claims.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  10. Technical assistance contractor management plan: Surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC's mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel

  11. Technical assistance contractor management plan: Surface and ground water

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  12. Personnel development in the 1990's

    International Nuclear Information System (INIS)

    Burt, G.L.; Stibbs, W.

    1991-01-01

    The decade of the 1980s saw dramatic changes in the Drilling Industry worldwide; from record high utilization rates for mobile rigs to total depression and bankruptcies; from a strong market in the Gulf of Mexico to the steady flow of rigs to operating locations outside North America. A major drilling contractor operating on land and offshore, long known as an industry leader in training, has tripled its employee development efforts in the last five years to prepare for this challenge. This paper describes the Contractor's current program of training and highlights the commitment in resources required in order to provide for the operational continuity, manpower capability and safety objectives of the future. The paper clarifies the relationship it anticipates between the coming manpower shortage, development of personnel and the safety of its people and environment. It discusses plans already in place to effectively develop drilling expertise in lesser developed countries of operation

  13. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    Energy Technology Data Exchange (ETDEWEB)

    Chockie, Alan [Chockie Group International, Inc., Seattle, WA (United States)

    2005-09-15

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  14. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    International Nuclear Information System (INIS)

    Chockie, Alan

    2005-09-01

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  15. Out of the Shadows: The Health and Well-Being of Private Contractors Working in Conflict Environments.

    Science.gov (United States)

    Dunigan, Molly; Farmer, Carrie M; Burns, Rachel M; Hawks, Alison; Setodji, Claude Messan

    2014-01-01

    Over the past decade, private contractors have been deployed extensively around the globe. In addition to supporting U.S. and allied forces in Iraq and Afghanistan, contractors have assisted foreign governments, nongovernmental organizations, and private businesses by providing a wide range of services, including base support and maintenance, logistical support, transportation, intelligence, communications, construction, and security. At the height of the conflicts in Iraq and Afghanistan, contractors outnumbered U.S. troops deployed to both theaters. Although these contractors are not supposed to engage in offensive combat, they may nonetheless be exposed to many of the stressors that are known to have physical and mental health implications for military personnel. RAND conducted an online survey of a sample of contractors who had deployed on contract to a theater of conflict at least once between early 2011 and early 2013. The survey collected demographic and employment information, along with details about respondents' deployment experience (including level of preparation for deployment, combat exposure, and living conditions), mental health (including probable posttraumatic stress disorder, depression, and alcohol misuse), physical health, and access to and use of health care. The goal was to describe the contractors' health and well-being and to explore differences across the sample by such factors as country of citizenship, job specialty, and length and frequency of contract deployment. The findings provide a foundation for future studies of contractor populations and serve to inform policy decisions affecting contractors, including efforts to reduce barriers to mental health treatment for this population.

  16. Integrating Contractors into the Logistics Force

    National Research Council Canada - National Science Library

    Terrell, Ronald G

    2006-01-01

    ... a panacea. For a combatant commander to effectively integrate them with his military force requires an understanding of the operational environment, contractor capabilities, acceptable levels of risk...

  17. 48 CFR 1509.170-8 - Contractor Performance Report.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  18. 48 CFR 1845.502-70 - Contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  19. 48 CFR 47.207-5 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  20. 48 CFR 18.102 - Central contractor registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  1. Advantages of the production contractor concept

    Energy Technology Data Exchange (ETDEWEB)

    Gisvold, K.M. [Golar-Nor Offshore, Trondheim (Norway)

    1994-12-31

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  2. Accounting calculations problems with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Tikholaz I.A.

    2016-12-01

    Full Text Available in the article an order of accounting reflection of payments with suppliers and contractors are researched and ways of enhancement of accounting calculations process development with the purpose of management decisions optimization for their implementation are offered. Theoretical bases of intraeconomic control of settlings with suppliers and contractors are developed.

  3. 40 CFR 68.87 - Contractors.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... specialty work on or adjacent to a covered process. It does not apply to contractors providing incidental...

  4. 48 CFR 32.909 - Contractor inquiries.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  5. 48 CFR 4.102 - Contractor's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  6. 30 CFR 875.20 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  7. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  8. 30 CFR 874.16 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  9. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  10. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  11. Advantages of the production contractor concept

    International Nuclear Information System (INIS)

    Gisvold, K.M.

    1994-01-01

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  12. Neutron personnel dosimetry

    International Nuclear Information System (INIS)

    Griffith, R.V.

    1981-01-01

    The current state-of-the-art in neutron personnel dosimetry is reviewed. Topics covered include dosimetry needs and alternatives, current dosimetry approaches, personnel monitoring devices, calibration strategies, and future developments

  13. Personnel Monitoring Department - DEMIN

    International Nuclear Information System (INIS)

    1989-01-01

    The activities and purposes of the Personnel Monitoring Dept. of the Institute of Radioprotection and Dosimetry of the Brazilian CNEN are presented. A summary of the personnel monitoring service is given, such as dosemeters supply, laboratorial inspections, and so on. The programs of working, publishing, courses and personnel interchange are also presented. (J.A.M.M.)

  14. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2013-08-01

    ..., Sequence 1] RIN 9000-AM09 Federal Acquisition Regulation; Documenting Contractor Performance AGENCY... the Contractor Performance Assessment Reporting System (CPARS), the single Governmentwide past... Procurement Policy (OFPP) memorandum entitled ``Improving the Use of Contractor Performance Information...

  15. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  16. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  17. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  18. Employee or independent contractor? A summary of court, umpire and referee decisions relating to employee status

    International Nuclear Information System (INIS)

    Baird, S.; Morris, M.

    1999-01-01

    Nine case examples of disputes regarding the distinction between contractor personnel and employee status were presented. The cases involved people hired for services by Sunstar Uniforms Inc., S.A.M. Distributors, Malibu Homes Construction Ltd., Perfect Drywall Co. Ltd., Tim Horton's, Badger Mechanical Services Whitecourt Ltd., Hostage Musical Group, a chocolate bar seller in Regina, and Normatec Consultants Inc. This presentation described the disputes for each unique case and presented the outcome as decided by the courts

  19. Employee or independent contractor? A summary of court, umpire and referee decisions relating to employee status

    Energy Technology Data Exchange (ETDEWEB)

    Baird, S.; Morris, M. [Alberta Labour, Edmonton, AB (Canada)

    1999-07-01

    Nine case examples of disputes regarding the distinction between contractor personnel and employee status were presented. The cases involved people hired for services by Sunstar Uniforms Inc., S.A.M. Distributors, Malibu Homes Construction Ltd., Perfect Drywall Co. Ltd., Tim Horton's, Badger Mechanical Services Whitecourt Ltd., Hostage Musical Group, a chocolate bar seller in Regina, and Normatec Consultants Inc. This presentation described the disputes for each unique case and presented the outcome as decided by the courts.

  20. Employee or independent contractor? A summary of court, umpire and referee decisions relating to employee status

    Energy Technology Data Exchange (ETDEWEB)

    Baird, S.; Morris, M. [Alberta Labour, Edmonton, AB (Canada)

    1999-10-01

    Nine case examples of disputes regarding the distinction between contractor personnel and employee status were presented. The cases involved people hired for services by Sunstar Uniforms Inc., S.A.M. Distributors, Malibu Homes Construction Ltd., Perfect Drywall Co. Ltd., Tim Horton`s, Badger Mechanical Services Whitecourt Ltd., Hostage Musical Group, a chocolate bar seller in Regina, and Normatec Consultants Inc. This presentation described the disputes for each unique case and presented the outcome as decided by the courts.

  1. Personnel preferences in personnel planning and scheduling

    OpenAIRE

    van der Veen, Egbert

    2013-01-01

    Summary The personnel of an organization often has two conflicting goals. Individual employees like to have a good work-life balance, by having personal preferences taken into account, whereas there is also the common goal to work efficiently. By applying techniques and methods from Operations Research, a subfield of applied mathematics, we show that operational efficiency can be achieved while taking personnel preferences into account. In the design of optimization methods, we explicitly con...

  2. Occupational dose reduction at Department of Energy contractor facilities: Study of ALARA programs

    International Nuclear Information System (INIS)

    Dionne, B.J.; Meinhold, C.B.; Khan, T.A.; Baum, J.W.

    1992-03-01

    This report provides the US Department of Energy (DOE) and its contractors with information that will be useful for reducing occupational radiation doses at DOE's nuclear facilities. In 1989 and 1990, health physicists from the Brookhaven National Laboratory's (BNL) ALARA Center visited twelve DOE contractor facilities with annual collective dose equivalents greater than 100 person-rem (100 person-cSv). The health physicists interviewed radiological safety staff, engineers, and training personnel who were responsible for dose control. The status of ALARA practices at the major contractor facilities was compared with the requirements and recommendation in DOE Order 5480.11 ''Radiation Protection for Occupational Workers'' and PNL-6577 ''Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are as Low as Reasonably Achievable.'' The information and data collected are described and examples of successful practices are presented. The findings on the status of the DOE Contractor ALARA Programs are summarized and evaluated. In addition, the supplement to this report contains examples of good-practice documents associated with implementing the major elements of a formally documented ALARA program for a major DOE contractor facility

  3. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-16

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...

  4. Department of Energy standard for the performance testing of personnel dosimetry systems

    International Nuclear Information System (INIS)

    1986-12-01

    This standard is intended to be used in the Department of Energy Laboratory Accreditation Program (DOELAP) for personnel dosimetry systems. It is based on the American National Standards Institute's (ANSI) ''Criteria for Testing Personnel Dosimetry Performance,'' ANSI N13.11-1983, recommendations made to DOE in ''Guidelines for the Calibration of Personnel Dosimeters,'' Pacific Northwest Laboratory (PNL)-4515 and comments received during peer review by DOE and DOE contractor personnel. The recommendations contained in PNL-4515 were based on an evaluation of ANSI N13.11 conducted for the Office of Nuclear Safety, DOE, by PNL. Parts of ANSI N13.11 that did not require modification were used essentially intact in this standard to maintain consistency with nationally recognized standards. Modifications to this standard have resulted from several DOE/DOE contractor reviews and a pilot testing session. An initial peer review by selected DOE and DOE contractor representatives on technical content was conducted in 1983. A review by DOE field offices, program offices, and contractors was conducted in mid-1984. A pilot performance testing session sponsored by the Office of Nuclear Safety was conducted in early 1985 by the Radiological and Environmental Sciences Laboratory, Idaho Falls. Results of the pilot test were reviewed in late 1985 by a DOE and DOE contractor committee. 11 refs., 4 tabs

  5. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  6. Qualification of quality testing personnel, in particular the training offered

    International Nuclear Information System (INIS)

    Knoedler, D.

    1980-01-01

    Personnel qualification is one of the most important tasks of quality assurance. The qualification is reached by professional education, by experience made on the job and by additional external and company-internal training. A determination of qualification requirements should cover only the general principles. Especially this should be considered specifying the requirements for theoretical knowledge and for examinations since the factor of relevant experience is difficult to be estimated by third parties. Equal principles apply for the personnel of the manufacturer, of the main contractor, of the utility and of the auhtorized inspectors' organizations. The detailed guidelines should be part of the internal QA-systems of the organizations involved. (orig.) [de

  7. Major issues in the training of security personnel

    International Nuclear Information System (INIS)

    Knauf, W.M.; Robertson, L.P.

    1982-01-01

    The effectiveness of the response component of a physical protection system depends greatly upon the training received by the security personnel. The issues and problems in the area of training which were of greatest concern to the attendees of the 1980 and 1981 INMM sponsored Technical Workshops on Guard Training are discussed. The attendees were training supervisors of managers of security personnel and represented a variety of organizations and companies including DOE facilities, NRC licensees, the military, private security contractors, and governmental agencies. Major categories of concern include: professionalism in security, legal constraints and obligations, physical and psychological testing and standards, governmental requirements, morale and motivation, and tactical training techniques

  8. Contractor Past Performance - Are We There Yet?

    National Research Council Canada - National Science Library

    Guerrero, Juan

    2001-01-01

    During the United States federal government acquisition reform movement of the 1990s, the government strongly emphasized the use of past performance information to select contractors in federal procurements...

  9. institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    p2333147

    Keywords: Institutions; small-scale contractor performance; sugar industry. ABSTRACT ..... diverse cultural settings, women, specifically widowed or single women, have a .... constraints on business growth, such as the work limitations placed.

  10. A guide for heating contractor; Opas laempoeyrittaejaelle

    Energy Technology Data Exchange (ETDEWEB)

    Solmio, H; Tuomi, S; Valkonen, J

    1996-12-31

    Heating contractor is eg. a forest owner, who is responsible for the heating of a commune owned school using firewood purchased from the contractor`s own forests. This is a new alternative for entrepreneurship in the countryside. This guide has been meant as an aid for persons starting heating contraction. It is supposed to be of importance for the designers of the communal energy supply, for advisors and instructors, as well as for those already started the heating contraction. The guide discusses the following topics: Why to became a heating contractor; The ways of heating contraction; operational requirements; Contracts; Conversion of a boiler plant to wood fuels; Fuel purchase; Heating work; Profitably estimation; Examples of operational solutions. The guide also includes as an example a draft contract for heating contraction

  11. Assessing Contractor Capabilities for Streamlined Site Investigations

    Science.gov (United States)

    The purpose of this document is to familiarize and encourage brownfields decision makers to investigate and employ innovative methods for characterizing their sites, to assist brownfields decision makers in assessing contractors' capabilities.

  12. Information technology boosts contractor's economic success

    International Nuclear Information System (INIS)

    Penny, M.; Vasey, G.M.

    1995-01-01

    This article will discuss the advantages of Information Technology (IT) and how one drilling contractor, Global Marine, has applied this technology. The company has applied it in an efficient manner which has provided business benefits and cost reductions that have helped its operations be more successful. The following are the different aspects of information technology that led to the contractor's success: cost reduction measures; migration to a client/server IT infrastructure; IT business benefits; and keys to obtaining business benefits from IT

  13. Environmental liability and the independent contractor

    International Nuclear Information System (INIS)

    Gilmour, B.S.

    1999-01-01

    The provisions of the Environmental Protection and Enhancement Act (EPEA) regarding the relationship between a company and an independent contractor were reviewed. The EPEA was introduced in September 1993 and significantly altered the environmental laws in the province of Alberta. The provisions of the EPEA that apply to the petroleum industry are conservation and reclamation as well as provisions concerning release of substances, contaminated sites and penalties. Companies that pollute may be held liable for reclamation, even if the work was carried out by an independent contractor and despite the fact that the independent contractor is not an employee of the company. Under the current EPEA laws, companies may not be able to effectively shift responsibility for environmental liabilities to independent contractors even where the contractor was negligent. This paper presented suggestions regarding contractor agreements and due diligence to help minimize the risk of liability to companies. The paper also discussed the following two types of liabilities under the EPEA's harmful substances section: (1) the obligation to clean up an affected area, and (2) fines and penalties that may be imposed when an offence is committed

  14. 48 CFR 1252.242-71 - Contractor testimony.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  15. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  16. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  17. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  18. 48 CFR 52.241-5 - Contractor's Facilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  19. 48 CFR 52.247-28 - Contractor's Invoices.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  20. 48 CFR 52.204-7 - Central Contractor Registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  1. 30 CFR 45.4 - Independent contractor register.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  2. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  3. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  4. 48 CFR 1852.209-72 - Composition of the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  5. 42 CFR 455.202 - Limitation on contractor liability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  6. 48 CFR 752.7013 - Contractor-mission relationships.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  7. 48 CFR 852.237-70 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  8. Personnel preferences in personnel planning and scheduling

    NARCIS (Netherlands)

    van der Veen, Egbert

    2013-01-01

    Summary The personnel of an organization often has two conflicting goals. Individual employees like to have a good work-life balance, by having personal preferences taken into account, whereas there is also the common goal to work efficiently. By applying techniques and methods from Operations

  9. Technical assistance contractor occurrence reporting and processing system

    International Nuclear Information System (INIS)

    1996-08-01

    Members of the Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) are responsible to notify management of TAC occurrence reporting and processing system (ORPS) classified occurrences .An ORPS occurrence is an unexpected or unplanned event on DOE property which causes bodily harm, death, damage to government property, exposure to toxic or hazardous substances above acceptable limits to workers, the environment, or general public. Examples of potential reportable occurrences include, but not limited to, site personnel exposures to airborne contaminants, incidents which could expose the general public to high levels of radiation or other contaminants, a vehicle accident resulting in property damage or personnel injuries. Listed TAC manager/staff contacts, with the assistance of TAC ORPS Program Coordinators, will determine if the occurrence is reportable under Department of Energy (DOE) Order M 232.1-2. The reportable occurrences will be classified as emergency, unusual, or off-normal. If determined to be reportable, listed TAC manager/staff will verbally report the details of the occurrence to the DOE Duty Officer within 2 hours of initial notification, and provide a written report of the event by noon the following work day

  10. Personnel Policy and Profit

    DEFF Research Database (Denmark)

    Bingley, Paul; Westergård-Nielsen, Niels Chr.

    2004-01-01

    personnel structure variation. It is found that personnel policy is strongly related to economic performance. At the margin, more hires are associated with lower profit, and more separations with higher profit. For the average firm, one new job, all else equal, is associated with ?2680 (2000 prices) lower...

  11. Hanford Site Welding Program Successfully Providing A Single Site Function For Use By Multiple Contractors

    International Nuclear Information System (INIS)

    Cannell, G.R.

    2009-01-01

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  12. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Honeyman, J.O.

    1998-01-01

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  13. Operator and contractor benefit from incentive contracts

    International Nuclear Information System (INIS)

    Brandon, B.

    1991-01-01

    This book reports that with incentive contracts, drilling and service contractors assume greater responsibility for operations. That helps them to align their goals more closely with those of the operator. This achieves a more equitable division of the risks. Many operators and contractors believe this is a more appropriate approach to contracting drilling services. As they assume manageable responsibility, each party also has opportunities for greater reward. Innovations in cooperation can create a win-win situation. In a win-win contract all parties benefit from the new relationships between operator, contractor, and service company. The win-win situation can only be achieved by allowing the contracting parties to become much more closely involved in drilling operations. This is the primary motivation behind development of more productive contracting strategies

  14. Training of nonlicensed personnel

    International Nuclear Information System (INIS)

    Hetrick, D.E.

    1975-01-01

    The safety and efficiency with which a station operates is a function of the competence and proficiency of all personnel. This includes the nonlicensed personnel who make up the bulk of the station staff. Thus the training of these members of the station complement is an important function in overall station performance. Standards, regulations, regulatory guides, and codes provide guidance to the training requirements for such personnel. Training needs and objectives must be established, a plan prepared and then all incorporated into a training program. A well planned and operated training program will stimulate effective communications between the different groups within the station and between the station and off site support groups

  15. 48 CFR 1552.209-73 - Notification of conflicts of interest regarding personnel.

    Science.gov (United States)

    2010-10-01

    ... the Contractor. A personal conflict of interest is defined as a relationship of an employee... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Notification of conflicts... Texts of Provisions and Clauses 1552.209-73 Notification of conflicts of interest regarding personnel...

  16. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... management and HR concepts and approaches. Methodologically, a sample of the top level leaders of the hundred largest business units at some thirty Scandinavian contractors has been analysed. The focus is on the 400 top level managers in these organisations. On the basis of a desk study, an analysis of 124...

  17. Civilian Personnel: Career Management

    National Research Council Canada - National Science Library

    2001-01-01

    This revision; (1) Contains changes required by the establishment of a consolidated and realigned management structure for civilian personnel, manpower, and related functions in the Office of the Assistant Secretary of the Army...

  18. Personnel neutron dosimetry

    International Nuclear Information System (INIS)

    Hankins, D.

    1982-04-01

    This edited transcript of a presentation on personnel neutron discusses the accuracy of present dosimetry practices, requirements, calibration, dosemeter types, quality factors, operational problems, and dosimetry for a criticality accident. 32 figs

  19. Personnel dose assignment practices

    International Nuclear Information System (INIS)

    Fix, J.J.

    1993-04-01

    Implementation of DOE N 5480.6 Radiological Control Manual Article 511(3) requirements, to minimize the assignment of personnel dosimeters, should be done only under a broader context ensuring that capabilities are in place to monitor and record personnel exposure both for compliance and for potential litigation. As noted in NCRP Report No. 114, personnel dosimetry programs are conducted to meet four major objectives: radiation safety program control and evaluation; regulatory compliance; epidemiological research; and litigation. A change to Article 511(3) is proposed that would require that minimizing the assignment of personnel dosimeters take place only following full evaluation of overall capabilities (e.g., access control, area dosimetry, etc.) to meet the NCRP objectives

  20. Personnel radiation dosimetry

    International Nuclear Information System (INIS)

    1987-01-01

    The book contains the 21 technical papers presented at the Technical Committee Meeting to Elaborate Procedures and Data for the Intercomparison of Personnel Dosimeters organizaed by the IAEA on 22-26 April 1985. A separate abstract was prepared for each of these papers. A list of areas in which additional research and development work is needed and recommendations for an IAEA-sponsored intercomparison program on personnel dosimetry is also included

  1. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors. FY 1995 report

    Energy Technology Data Exchange (ETDEWEB)

    Pemberton, S.

    1996-02-01

    The Department of Energy and its contractors are faced with environmental concerns and large waste management costs. Federal legislation and DOE Orders require sites to develop waste minimization/pollution prevention programs. In response to these requirements, the Kansas City Plant developed a pollution prevention tool called a pollution prevention opportunity assessment (PPOA). Pilot assessments resulted in the development of a graded approach to reduce the amount of effort required for activities that utilized nonhazardous and/or low-volume waste streams. The project`s objectives in FY95 were to validate DOE`s PPOA Graded Approach methodology, provide PPOA training and technical assistance to interested DOE personnel and DOE contractors, enhance the methodology with energy analysis and tools for environmental restoration activities, implement a DOE-wide PPOA database, and provide support to DOE EM-334 in the completion of a report which estimates the future potential for pollution prevention and waste minimization in the DOE complex.

  2. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors. FY 1995 report

    International Nuclear Information System (INIS)

    Pemberton, S.

    1996-02-01

    The Department of Energy and its contractors are faced with environmental concerns and large waste management costs. Federal legislation and DOE Orders require sites to develop waste minimization/pollution prevention programs. In response to these requirements, the Kansas City Plant developed a pollution prevention tool called a pollution prevention opportunity assessment (PPOA). Pilot assessments resulted in the development of a graded approach to reduce the amount of effort required for activities that utilized nonhazardous and/or low-volume waste streams. The project's objectives in FY95 were to validate DOE's PPOA Graded Approach methodology, provide PPOA training and technical assistance to interested DOE personnel and DOE contractors, enhance the methodology with energy analysis and tools for environmental restoration activities, implement a DOE-wide PPOA database, and provide support to DOE EM-334 in the completion of a report which estimates the future potential for pollution prevention and waste minimization in the DOE complex

  3. Institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    Results show that contractors face institutional constraints (work allocation limitations, lack of performance incentives and high transaction costs, such as negotiation costs, the risk of a loss in work and contract default risk), cash flow problems, poor physical infrastructure and a lack of labour. It is expected that the promotion ...

  4. Excessive Profits of German Defense Contractors

    Science.gov (United States)

    2014-09-01

    its business unit Thyssen Krupp Marine Systems, is a German defense contractor. (2) Tognom AG Tognum AG owned the MTU Friedrichshafen GmbH before... Friedrichshafen provided engines for many ships of the German Navy and for German battle tanks, such as the Leopard I and Leopard II. MTU refers to the

  5. Improving UK client-contractor relations

    International Nuclear Information System (INIS)

    Brant, A.W.

    1996-01-01

    The client's aim in any decommissioning project is that the originally intended end point is achieved, within budget and on time. The contractor's aim is to have a satisfied client, so that both are happy to work together again, and to have a reasonable return for his efforts. How can these - not incompatible - aims best be achieved? (UK)

  6. Private Military Contractors, War Crimes and International ...

    African Journals Online (AJOL)

    The end of the Cold War witnessed the growth and spread of legally established private military contractors (PMCs) playing largely undefined roles in wars, international security and post-conflict reconstruction. The operations of PMCs in Iraq and Afghanistan in the 21st century have been marked by gross human rights ...

  7. Contractor Development Models for Promoting Sustainable Building – a case for developing management capabilities of contractors

    CSIR Research Space (South Africa)

    Dlungwana, Wilkin S

    2004-11-01

    Full Text Available Construction industry and indeed all small and medium-sized contractors play a significant socio-economic role in the developing countries. This paper highlights the importance of promoting sustainable building through the implementation...

  8. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  9. Emerging Trends of the Owner-Contractor Relationship for Capital Facility Projects: From the Contractor Perspective

    National Research Council Canada - National Science Library

    Geertsema, Cameron

    2003-01-01

    .... Specifically, this document will focus on how the outcome of capital facility projects are affected by human resources practices, and the management principles and practices of the contractor-owner...

  10. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  11. DoD Needs to Improve the Billing System for Health Care Provided to Contractors at Medical Treatment Facilities in Southwest Asia

    Science.gov (United States)

    2012-06-27

    for 1 day ($2,518); however, the bill should have been for 8 days ($20,144);  a patient treated for inflammation of the gallbladder for 1 day...Application. Therefore, once we extracted those patients whose patient category was listed as contractor personnel and removed the duplicate line items

  12. 48 CFR 645.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  13. Contractors on the Battlefield: Planning Considerations and Requirements

    National Research Council Canada - National Science Library

    2002-01-01

    Contractors on the Battlefield: Planning Considerations and Requirements introduces the basics and foundation for those who want to learn about the history, terminology, and process for obtaining contractor support on the battlefield...

  14. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  15. Contractors on the Battlefield: What Have We Signed Up For?

    National Research Council Canada - National Science Library

    Zamparelli, Steven

    1999-01-01

    The role of contractors in warfare has changed dramatically. As the Services have drawn down, more and more of the duties formerly accomplished by military members are being performed by contractors...

  16. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  17. 48 CFR 245.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  18. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Science.gov (United States)

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  19. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  20. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  1. 48 CFR 970.5203-3 - Contractor's organization.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  2. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  3. 48 CFR 2452.251-70 - Contractor employee travel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  4. 48 CFR 450.303-1 - Contractor requests.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  5. 48 CFR 2936.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  6. 48 CFR 3052.204-71 - Contractor employee access.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  7. 48 CFR 45.501 - Prime contractor alternate locations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  8. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-09

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...

  9. 32 CFR 989.23 - Contractor prepared documents.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  10. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  11. 48 CFR 3036.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  12. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  13. 48 CFR 2152.215-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  14. 48 CFR 36.506 - Superintendence by the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  15. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  16. 48 CFR 1652.204-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  17. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  18. 6 CFR 25.8 - Government contractor Defense.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  19. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  20. 7 CFR 3015.183 - Access to contractor records.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  1. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Science.gov (United States)

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  2. A contractor's approach to engineering process plant for radioactive liquor processing

    International Nuclear Information System (INIS)

    Braide, W.M.; Fletcher, P.D.

    1982-01-01

    Protection of personnel from damaging sources of radiation is the overriding consideration which influences the fundamental design of plant for processing active liquors in the Nuclear Industry. The conventional design procedures of the Chemical Plant Contractor have therefore to be modified to meet the specific technology and additional safety requirements. Ways in which the added factor of radiation influences the design philosophy for Nuclear Plant compared to conventional Chemical Plant are described. Design philosophy is demonstrated by design studies for active liquor storage and evaporation plant. (author)

  3. A contractors's approach to engineering process plant for radioactive liquor processing

    International Nuclear Information System (INIS)

    Braide, W.M.; Fletcher, P.D.

    1982-01-01

    Protection of personnel from damaging sources of radiation is the overriding consideration which influences the fundamental design of plant for processing active liquors in the Nuclear Industry. The conventional design procedures of the Chemical Plant Contractor have therefore to be modified to meet the specific technology and additional safety requirements. This paper describes ways in which the added factor of radiation influences the design philosophy for Nuclear Plant compared to conventional Chemical Plant. The design philosophy is demonstrated by design studies for active liquor storage and evaporation plant. (author)

  4. An Assessment of Contractor Personnel Security Clearance Processes in the Four Defense Intelligence Agencies

    Science.gov (United States)

    2014-04-14

    the SECRET Internet Protocol Router Network (SJPRNET) to donald.dixon@dodig.smil.mil . We appreciate the courtesies extended to our s taff. ~~~ 822...Cuordinuwr .Ju.., lifi .:n1iun I OriGIIIn<or Ju>tiO<ntlon for Ht>uhllloro: I f’onnll nll-lnrC.-IIIIIIIl’ -11 ----->-; I ~~ J I (’ 01tr1lln_.IO r .I U

  5. CONTINGENCY CONTRACTING: DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan

    National Research Council Canada - National Science Library

    Hutton, John; Ayers, Johana R; Berkholtz, Jessica M; Brandon, E; Culley, Brendan S; James, Jr., Art; McMillen, Lisa A; McSween, Jean; Thornton, Karen

    2008-01-01

    DOD, State, and USAID reported that they obligated at least $33.9 billion during fiscal year 2007 and the first half of fiscal year 2008 on 56,925 contracts with performance in either Iraq or Afghanistan...

  6. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Science.gov (United States)

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  7. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  8. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-10-01

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  9. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  10. Needs of Non Energy-Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  11. Needs of Non-Energy Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liakus, C. [Building Media and the Building America Retrofit Alliance (BARA), Wilmington, DE (United States)

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  12. Personnel photographic film dosimetry

    International Nuclear Information System (INIS)

    Keirim-Markus, I.B.

    1981-01-01

    Technology of personnel photographic film dosimetry (PPD) based on the photographic effect of ionizing radiation is described briefly. Kinds of roentgen films used in PPD method are enumerated, compositions of a developer and fixing agents for these films are given [ru

  13. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  14. Nuclear Test Personnel Review

    Science.gov (United States)

    FOIA Electronic Reading Room Privacy Impact Assessment DTRA No Fear Act Reporting Nuclear Test Personnel Review NTPR Fact Sheets NTPR Radiation Dose Assessment Documents US Atmospheric Nuclear Test History Documents US Underground Nuclear Test History Reports NTPR Radiation Exposure Reports Enewetak

  15. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  16. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Certa, P.J.

    1998-01-01

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  17. Modernization of personnel training

    International Nuclear Information System (INIS)

    Haferburg, M.; Rehn, H.

    1997-01-01

    Personnel training in German nuclear power plants adheres to high standards complying with government regulations. The development of PC technology allows the introduction of new training methods, e.g. computer based training (CBT), as well as their integration into existing systems. In Germany, the operators of nuclear power plants have developed their own computer based standards with a screen design, a hardware platform and an assessment standard. 25% of the theoretical training of the shift personnel is covered by CBT. The CBT-Programmes offer multimedia features: videos, photographs, sound, graphs and switching diagrams of existing systems, practice oriented simulations and 3-D animations. Interaction is the most important attribute of an efficient self-learning-programme. A typical example of such an appropriate theme is the CBT-Lesson ''Pressure Surges in Pipes and Components of Power Plants''. (author)

  18. Do Military Personnel Patent

    Science.gov (United States)

    2016-12-01

    following questions: In what fields are military personnel most likely to patent, and how do demographics, such as age, race, and gender , along with...technologies, which have transformed how the United States wages war. DARPA continues to develop new technologies and capabilities for the U.S. military today...build the European navies so it instead decided to utilize an innovative ship design to exploit a gap specific to the British Royal Navy. The six

  19. Employment of security personnel

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    If a company or institution hires personnel of a security service company to protect its premises, this kind of employment does not mean the company carries on temporary employment business. Within the purview of section 99, sub-section 1 of the BetrVG (Works Constitution Act), the security service personnel is not 'employed' in the proper sense even if the security tasks fulfilled by them are done at other times by regular employees of the company or institution. The court decision also decided that the Works Council need not give consent to employment of foreign security personnel. The court decision was taken for settlement of court proceedings commenced by Institute of Plasma Physics in Garching. In his comments, W. Hunold accedes to the court's decision and discusses the underlying reasons of this decision and of a previous ruling in the same matter by putting emphasis on the difference between a contract for services and a contract for work, and a contract for temporary employment. The author also discusses the basic features of an employment contract. (orig./HP) [de

  20. Automatic personnel contamination monitor

    International Nuclear Information System (INIS)

    Lattin, Kenneth R.

    1978-01-01

    United Nuclear Industries, Inc. (UNI) has developed an automatic personnel contamination monitor (APCM), which uniquely combines the design features of both portal and hand and shoe monitors. In addition, this prototype system also has a number of new features, including: micro computer control and readout, nineteen large area gas flow detectors, real-time background compensation, self-checking for system failures, and card reader identification and control. UNI's experience in operating the Hanford N Reactor, located in Richland, Washington, has shown the necessity of automatically monitoring plant personnel for contamination after they have passed through the procedurally controlled radiation zones. This final check ensures that each radiation zone worker has been properly checked before leaving company controlled boundaries. Investigation of the commercially available portal and hand and shoe monitors indicated that they did not have the sensitivity or sophistication required for UNI's application, therefore, a development program was initiated, resulting in the subject monitor. Field testing shows good sensitivity to personnel contamination with the majority of alarms showing contaminants on clothing, face and head areas. In general, the APCM has sensitivity comparable to portal survey instrumentation. The inherit stand-in, walk-on feature of the APCM not only makes it easy to use, but makes it difficult to bypass. (author)

  1. Electronic Official Personnel Folder System

    Data.gov (United States)

    US Agency for International Development — The eOPF is a digital recreation of paper personnel folder that stores electronic personnel data spanning an individual's Federal career. eOPF allows employees to...

  2. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  3. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  4. National Radon Contractor Proficiency (RCP) Program. Proficiency report, June 1991

    International Nuclear Information System (INIS)

    1991-06-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in periodic RCP Proficiency Reports

  5. National Radon Contractor Proficiency (RCP) program. Proficiency report, September 1991

    International Nuclear Information System (INIS)

    1991-09-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving this objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide this information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under this voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  6. Modelling Client Satisfaction Levels: The Impact of Contractor Performance

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2012-11-01

    Full Text Available The performance of contractors is known to be a key determinant of client satisfaction.Here, using factor analysis, clients’ satisfaction is defined in several dimensions. Based onclients’ assessment of contractor performance, a number of satisfaction models developedusing the multiple regression (MR technique are presented. The models identify arange of variables encompassing contractor performance, project performance and respondent(i.e. client attributes as useful predictors of satisfaction levels. Contractor performanceattributes were found to be of utmost importance indicating that clientsatisfaction levels are mainly dependent on the performance of the contractor. Furthermore,findings suggest that subjectivity is to some extent prevalent in clients’ performanceassessment. The models demonstrate accurate and reliable predictive power as confirmedby validation tests. Contractors could use the models to help improve their performanceleading to more satisfied clients. This would also promote the development ofharmonious working relationships within the construction project coalition.

  7. National Radon Contractor Proficiency (RCP) Program. Proficiency report, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  8. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  9. TECHNICAL AND ECONOMICAL ANALYSIS OF LOGGING CONTRACTORS

    Directory of Open Access Journals (Sweden)

    Abilio Donizetti de Morais Filho

    2009-09-01

    Full Text Available The objective of this study was to describe the financial conditions of forestry contractors, concerning life quality aspects, condition of work and equipments, operational costs, and economic credit to invest in new technologies. Five companies had been analyzed, with an annual income between US$ 400,000.00 and US$ 1,720,000.00, with an average of US$ 950,000.00. The number of employees varied between 33 and 181, and the companies were classified in terms of size as: one small, two average, and two big. The main difficulties to invest in new machines were high financial taxes, more than 12% an year, and a lack of long term contracts to guarantee the payment capability. It was observed that the contractors did not consider the capital remuneration and a correct depreciation of machines, resulting in an average machine life higher than 10 years. The final conclusions were that the costs were above the paid values for the services, when computed the depreciation and capital remuneration, with negative results in the financial analyzes of three companies. Finally, the mechanization process increased the workers life quality, however, the annual income was around US$ 2,112.00 per worker, approximately 39% lower than the average Brazilian population.

  10. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  11. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  12. Personnel ionizing radiation dosimeter

    International Nuclear Information System (INIS)

    Williams, R.A.

    1975-01-01

    A dosimeter and method for use by personnel working in an area of mixed ionizing radiation fields for measuring and/or determining the effective energy of x- and gamma radiation; beta, x-, and gamma radiation dose equivalent to the surface of the body; beta, x-, and gamma radiation dose equivalent at a depth in the body; the presence of slow neutron, fast neutron dose equivalent; and orientation of the person wearing the dosimeter to the source of radiation is disclosed. Optionally integrated into this device and method are improved means for determining neutron energy spectrum and absorbed dose from fission gamma and neutron radiation resulting from accidental criticality

  13. Personnel policy and management

    International Nuclear Information System (INIS)

    Dangelmaier, P.

    1986-01-01

    In the field of personnel policy and management two main points must be considered and fitted together: the aspects of the applicant and the aspects of the utility. The applicant wishes a position which suits to his abilities, education, training, experience and self-evaluation. The enterprise has beside these qualification criteria to look to some additional points: reliability - not only in the profession of the applicant but also in his daily life. In this examination licensing authorities are involved too; responsibility in a very broad sense and the ability to make correct decisions sometimes under stress situations. (orig.)

  14. WORKER PROTECTION: Federal Contractors and Violations of Labor Law

    National Research Council Canada - National Science Library

    1995-01-01

    ... of Federal Contract Compliance Programs (OFCCP). Federal law and an executive order place greater responsibilities on federal contractors compared with other employers In some areas of workplace activity...

  15. Selection and assessment of contractors; Auswahl und Beurteilung von Auftragnehmerfirmen

    Energy Technology Data Exchange (ETDEWEB)

    Lier, K.H. [ExxonMobil Production Deutschland GmbH, Hannover (Germany)

    2007-09-13

    Reliable and efficient contractors are important for the activities of ExxonMobil. Qualification of contractors is to ensure that contractors provide technical services in accordance with the specifications of ExxonMobil. Apart from the financial, oranisational and legal qualification this covers technical qualification, i.e. industrial safety, health protection and environmental protection, as well as technical efficiency and quality. The ultimate intention is to find out if contractors have the processes and systems at their disposal that are required for the services. The qualification process is described. (orig.)

  16. When Contractors Deploy: A Guide for the Operational Commander

    National Research Council Canada - National Science Library

    Buhler, Carl

    2000-01-01

    .... Furthermore, this paper also lists four recommendations for operational commanders and the military on how to better integrate contractors into the military effort, especially during hostile combat situations...

  17. Personnel neutron dose assessment upgrade: Volume 1, Personnel neutron dosimetry assessment: [Final report

    International Nuclear Information System (INIS)

    Hadlock, D.E.; Brackenbush, L.W.; Griffith, R.V.; Hankins, D.E.; Parkhurst, M.A.; Stroud, C.M.; Faust, L.G.; Vallario, E.J.

    1988-07-01

    This report provides guidance on the characteristics, use, and calibration criteria for personnel neutron dosimeters. The report is applicable for neutrons with energies ranging from thermal to less than 20 MeV. Background for general neutron dosimetry requirements is provided, as is relevant federal regulations and other standards. The characteristics of personnel neutron dosimeters are discussed, with particular attention paid to passive neutron dosimetry systems. Two of the systems discussed are used at DOE and DOE-contractor facilities (nuclear track emulsion and thermoluminescent-albedo) and another (the combination TLD/TED) was recently developed. Topics discussed in the field applications of these dosimeters include their theory of operation, their processing, readout, and interpretation, and their advantages and disadvantages for field use. The procedures required for occupational neutron dosimetry are discussed, including radiation monitoring and the wearing of dosimeters, their exchange periods, dose equivalent evaluations, and the documenting of neutron exposures. The coverage of dosimeter testing, maintenance, and calibration includes guidance on the selection of calibration sources, the effects of irradiation geometries, lower limits of detectability, fading, frequency of calibration, spectrometry, and quality control. 49 refs., 6 figs., 8 tabs

  18. Training of personnel

    International Nuclear Information System (INIS)

    1997-01-01

    Selected staffs (in the area of NPPs) are examined by the State Examining Committee established by Nuclear Regulatory Authority of the Slovak Republic (NRA SR's) chairman. The committee consists of representatives of NRA SR , Bohunice NPPs, Mochovce NPP, Research Institute of Nuclear Energy and experts from the Faculty of Electrical Engineering and Information Technology of the Slovak Technical University. The review of selected personnel of NPP V-1, V-2 and Mochovce NPP which passed exams in 1996 is given. NRA SR paid attention to the upgrading training process of individual categories of staff for V-1, V-2 and Mochovce NPPs, simulator training and training with computerized simulation system according to the United criteria of nuclear installation personnel training that started in 1992. During the year, an inspection was performed focused on examination of technical equipment of the simulator of Mochovce NPP, professional eligibility and overall preparation of simulator training including simulator software. Throughout the year launching works continued at the simulator with the deadline of commissioning to trial use operation in the first half of 1997

  19. Quo vadis, personnel monitoring

    International Nuclear Information System (INIS)

    Becker, K.

    1975-01-01

    With the increasing use of nuclear power and radiation sources, the selection of optimum systems for personnel monitoring is becoming a matter of worldwide concern. The present status of personnel dosimetry, sometimes characterized by unstable and inaccurate detectors and oversimplified interpretation of the results, leaves much to be desired. In particular, photographic film, although having certain advantages with regard to economics and information content, undergoes rapid changes in warm and humid climates. Careful sealing reduces, but does not prevent, these problems. The replacement of film by solid-state dosimeters, primarily thermoluminescence dosimeters, is in progress or being considered by an increasing number of institutions and requires a number of decisions concerning the choice of the optimum detector(s), badge design, and evaluation system; organizational matters, such as the desirability of automation and computerized bookkeeping; etc. The change also implies the potential use of such advanced concepts as different detectors and monitoring periods for the large number of low-risk persons and the small number of high-risk radiation workers. (auth)

  20. Personnel training and certification

    International Nuclear Information System (INIS)

    Whittemore, W.L.

    1976-01-01

    In order to make the full benefits of neutron radiography available in the nondestructive test (NDT) field, it has been necessary to formalize its application. A group under the Penetrating Radiation Committee of the American Society for Nondestructive Testing (ASNT) was organized to prepare a recommended practice for neutron radiography. The recommended practices require the establishment of an appropriate certification program. The requirements on the employer to establish and maintain a qualification and certification program are outlined. To conduct a program of nondestructive testing using neutron radiography requires the usual three levels of qualified and certified personnel. The program is administered by a Level III person. Routine exposure, reviews, and reporting of test results are the responsibilities of Level I and Level II personnal. The amount of training and nature of the required practical examination are also specified. The recommended practices document assures users that NDT work in the field of neutron radiography is performed by qualified personnel. Although no training courses are available to provide experience in the depth required by the recommended practices document, SNT-TC-1A, short courses are provided at a number of locations to familarize user's representatives with the interpretation of neutron radiographs and capabilities and limitations of the technique

  1. Towards a new approach to the labour law applicable to contractors’ personnel

    CERN Multimedia

    Corinne Pralavorio

    2010-01-01

    On 18 October, CERN and its two Host States will sign agreements on the labour law applicable to the personnel of contractors operating on the CERN site. Once they have entered into force, the agreements will facilitate execution of service contracts for both firms and CERN, and will provide the personnel concerned with better security and more stability.   On 18 October 2010, CERN and its Host States have signed a tripartite agreement on the labour law applying to service contractors’ personnel. A site that straddles the French-Swiss border makes CERN unique among international organizations. Although this unique characteristic is a fine symbol of international collaboration, it also entails some legal and administrative difficulties. On 18 October, CERN and its Host States have signed a tripartite agreement on the labour law applying to service contractors’ personnel. This agreement will be supplemented by a bilateral agreement between France and Switzerland amending the 1...

  2. Personnel Selection Method Based on Personnel-Job Matching

    OpenAIRE

    Li Wang; Xilin Hou; Lili Zhang

    2013-01-01

    The existing personnel selection decisions in practice are based on the evaluation of job seeker's human capital, and it may be difficult to make personnel-job matching and make each party satisfy. Therefore, this paper puts forward a new personnel selection method by consideration of bilateral matching. Starting from the employment thoughts of ¡°satisfy¡±, the satisfaction evaluation indicator system of each party are constructed. The multi-objective optimization model is given according to ...

  3. 48 CFR 2427.305-2 - Follow-up by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  4. 77 FR 69715 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2012-11-20

    ... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...

  5. Rosneftegazstroy - Russia's premier oil and gas contractor

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    This special Petroleum Economist Sponsored Supplement looks at the present condition and future prospects of the Russian oil and gas industry. Russia's chief oil and gas contractor, Rosneftegazstroy, a joint stock company formed in 1991, took over from the former Soviet Union's Ministry of Oil and Gas Construction and from Neftegazstroy, the State concern. Responsible for the exploration and exploitation of the country's huge oil and gas reserves, Rosneftegazstroy has a mammoth task ahead to modernize and create an adequate infrastructure for its new commercial basis. Its foreign investment projects are described and plans for rebuilding and new developments are discussed. Russia's fuel and energy industries now show clear signs of increasing activity, amid a backdrop of falling production overall. (UK)

  6. Canadian pipeline contractors in holding pattern

    Energy Technology Data Exchange (ETDEWEB)

    Caron, G [Pe Ben Pipelines Ltd.; Osadchuk, V; Sharp, M; Stabback, J G

    1979-05-21

    A discussion of papers presented at a Pipe Line Contractors Association of Canada convention includes comments by G. Caron (Pe Ben Pipelines Ltd.) on the continued slack in big-inch pipeline construction into 1980 owing mainly to delayed U.S. and Canadian decisions on outstanding Alaska Highway gas pipeline issues and associated gas export bids and on the use of automatic welding for expeditious construction of the northern sections of the Alaska Highway pipeline; by V. Osadchuk (Majestic Wiley Contract. Ltd.) on the liquidation of surplus construction equipment because of these delays; by M. Sharp (Can. North. Pipeline Agency) on the need for close U.S. and Canadian governmental and industrial cooperation to permit an early 1980 start for construction of the prebuild sections of the Alaska pipeline; and by J. G. Stabback (Can. Natl. Energy Board) on the Alaska oil pipeline applications by Foothills Pipe Lines Ltd., Trans Mountain Pipe Line Co. Ltd., and Kitimat Pipe Line Ltd.

  7. Contractor Selection for Enhancing the Quality of University ...

    African Journals Online (AJOL)

    Contractor Selection for Enhancing the Quality of University Education in Nigeria using the Hamming Distance. DEA Omorogbe, SO Aibieyi. Abstract. The need for contractor selection in our university education system cannot be over emphasized. And applying scientific techniques for appropriateness and accuracy in the ...

  8. Critical Electronic Data Loss Perceptions of United States Military Contractors

    Science.gov (United States)

    Singletary, Tod J.

    2017-01-01

    The United States Military has become increasingly dependent upon technology to meet its mission objectives with a consequence being greater dependence on civilian defense contractors to provide specialized services in support of high-tech mission requirements. Modern military defense contractors have also become dependent upon reliable and secure…

  9. 48 CFR 970.0407 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  10. Beyond the design fix - New industrialisation in contractor's supplier relationships

    DEFF Research Database (Denmark)

    Koch, Christian; Frödell, M.; Josephson, P.E.

    2010-01-01

    by the Erabuild program, this paper presents 3 cases of long term transformation of contractor- supplier relations as general contractors outsource and commence professionalising purchasing moving it from project purchasing into strategic purchasing. It is suggested that “new industrialisation” is a long term...

  11. 14 CFR 1274.402 - Contractor acquired property.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property. 1274.402 Section 1274.402 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923...

  12. 48 CFR 36.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  13. 48 CFR 49.405 - Completion by another contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Completion by another contractor. 49.405 Section 49.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... contractor. If the surety does not arrange for completion of the contract, the contracting officer normally...

  14. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  15. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  16. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  17. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must be...

  18. 23 CFR 635.110 - Licensing and qualification of contractors.

    Science.gov (United States)

    2010-04-01

    ... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any...) No contractor shall be required by law, regulation, or practice to obtain a license before submission...

  19. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  20. 48 CFR 227.7108 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established when permitted by agency procedures. The contractual instrument establishing the data repository must...

  1. First year evaluation of EPA's radon contractor proficiency (RCP) program

    International Nuclear Information System (INIS)

    Salmon, G.L.

    1990-01-01

    This paper reports that the Environmental Protection Agency (EPA) has developed a voluntary program to evaluate radon reduction contractors and provide this information to the public, as part of activities mandated by the Indoor Radon Abatement Act (IRAA) of 1988. The Radon Contractor Proficiency Program consists of several elements that collectively help to ensure the proficiency of radon mitigators and give the public greater confidence in their capability. Contractors who participate in the program must pass a written examination, adhere to mitigation guidelines, keep records of work, meet continuing education requirements and pass a re-examination every two years. Upon meeting the program's requirements, mitigators are listed in EPA's National RCP Proficiency Report. The first Report released on May 15, 1990 listed 636 contractors. The second Report, to be release in August, will list 895 contractors, representing an increase of 40 per cent

  2. National Radon Contractor Proficiency Program. Proficiency report: Supplement

    International Nuclear Information System (INIS)

    1991-02-01

    The report, a supplement to the RCP Proficiency Report, will further assist governmental officials in providing advice to the public on the selection of proficient radon mitigation contractors. These reports list 1,123 contractors who have met the requirements of the RCP Program as of December 15, 1990. The Proficiency Report provides information on each contractor's name, RCP identification number, company name, address, phone number, and geographic service area. The report provides two additional tables, indexed by company name and by RCP identification number. The report is intended to help users quickly identify a proficient contractor if only the company name is known, or to verify which contractor is associated with a particular ID number

  3. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2012-08-27

    ...; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD), General... collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods...

  4. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-09-30

    ...; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any of...

  5. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  6. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  7. 78 FR 12316 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2013-02-22

    ...; Information Collection; Central Contractor Registration AGENCIES: Department of Defense (DOD), General... collection requirement concerning the Central Contractor Registration database. A notice was published in the... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  8. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Science.gov (United States)

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  9. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...

  10. 77 FR 63835 - Office of the Chief Information Officer; Submission for OMB Review; Temporary Contractor...

    Science.gov (United States)

    2012-10-17

    ... of the Chief Information Officer; Submission for OMB Review; Temporary Contractor Information... information collection requirement regarding temporary contractor information worksheet. A notice was... for temporary contractors as a result of the American Recovery and Reinvestment Act of 2009 (Public...

  11. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  12. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-06-27

    ...; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... contractor business ethics compliance program and disclosure requirements. Public comments are particularly... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements...

  13. 77 FR 43078 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2012-07-23

    ...; Information Collection; Central Contractor Registration AGENCY: Department of Defense (DOD), General Services... requirement concerning the Central Contractor Registration database. Public comments are particularly invited... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  14. 77 FR 17098 - Proposed Extension of Existing Information Collection; Independent Contractor Registration and...

    Science.gov (United States)

    2012-03-23

    ... Information Collection; Independent Contractor Registration and Identification AGENCY: Mine Safety and Health...-00040, Independent Contractor Register. OMB last approved this information collection request (ICR) on...); or 202-693-9441 (facsimile). SUPPLEMENTARY INFORMATION: I. Background Independent contractors...

  15. Rebuilding Iraq: DoD and State Department Have Improved Oversight and Coordination of Private Security Contractors in Iraq, but Further Actions are Needed to Sustain Improvements

    Science.gov (United States)

    2008-07-01

    MNC-I Multi-National Corps-Iraq MNF-I Multi-National Force-Iraq PSC private security contractor RSO Regional Security Office TOC tactical...maritime and territorial jurisdiction’ to include a housing complex leased by the U.S. military on a military base in Germany where a sexual assault...and monitored by RSO personnel in the RSO TOC . Motorcade vehicles are equipped with video cameras that record and document motorcade movements and

  16. Site security personnel training manual

    International Nuclear Information System (INIS)

    1978-10-01

    As required by 10 CFR Part 73, this training manual provides guidance to assist licensees in the development of security personnel training and qualifications programs. The information contained in the manual typifies the level and scope of training for personnel assigned to perform security related tasks and job duties associated with the protection of nuclear fuel cycle facilities and nuclear power reactors

  17. Personnel Officers: Judging Their Qualifications.

    Science.gov (United States)

    Webb, Gisela

    1988-01-01

    Discusses the backgrounds and qualifications appropriate for a library personnel administrator, including (1) a master's degree in library science; (2) library work experience; (3) additional training in administration, personnel management, organizational development, and psychology; and (4) personal attributes such as good communication skills,…

  18. Personnel Practices for Small Colleges.

    Science.gov (United States)

    Bouchard, Ronald A.

    Personnel administration in higher education is the focus of this "hands-on, how-to-do-it" guide that provides fundamental materials for developing and maintaining a sound personnel program. Part One (Employment) examines government regulations, employee recruitment and selection, pre-employment inquiries and screening, post-employment process,…

  19. Neutron personnel dosimetry

    International Nuclear Information System (INIS)

    Griffith, R.V.

    1982-01-01

    The measurement of neutron exposures to personnel is an issue that has received increased attention in the last few years. It is important to consider key aspects of the whole dosimetry system when developing dose estimates. This begins with selection of proper dosimeters and survey instruments, and extends through the calibration methods. One must match the spectral response and sensitivity of the dosimeter to the spectral characteristics of the neutron fields. Threshold detectors that are insensitive to large fractions of neutrons in the lower energy portion of reactor spectra should be avoided. Use of two or more detectors with responses that complement each other will improve measurement quality. It is important to understand the spectral response of survey instruments, so that spectra which result in significant overresponse do not lead to overestimation of dose. Calibration sources that do not match operational field spectra can contribute to highly erroneous results. In those situations, in-field calibration techniques should be employed. Although some detection developments have been made in recent years, a lot can be done with existing technology until fully satisfactory, long term solutions are obtained

  20. Personnel dosimetry in fluoroscopy

    International Nuclear Information System (INIS)

    Baechler, S.; Gardon, M.; Bochud, F.; Sans-Merce, M.; Verdun, F.R.; Trueb, Ph.

    2006-01-01

    Physicians who frequently perform fluoroscopic examinations are exposed to high intensity radiation fields and should use protective equipment such as lead aprons, thyroid shields and lead glasses. Standard individual dosimeters are worn under the lead apron in order to measure a dose that is representative of effective dose. However, large parts of the body are not protected by the apron (e.g. arms, head). Given a protection factor for the apron of about 100, an important irradiation of a body part not under the apron could go undetected. A study was conducted to analyse this situation by measuring dose using two dosimeters, one over-apron and one under-apron, for radiologists performing frequent fluoroscopic examinations. Measurements made over six-month period show that, indeed, the use of a single under-apron dosimeter is inadequate for personnel monitoring. Large doses to the head and arms are going undetected by this technique. A method for weighting the doses measured by under- and over-apron dosimeters to obtain a value better representative of the effective dose will be proposed. (authors)

  1. National Radon Contractor Proficiency Program. Proficiency report, October 1990

    International Nuclear Information System (INIS)

    1990-10-01

    The report lists those individual contractors in the United States who have met the requirements of the Radon Contractor Proficiency (RCP) Program as of August 18, 1990. These requirements are designed to provide minimum proficiency criteria for individuals who design and supervise the installation of radon mitigation systems in buildings. (Some States have more stringent requirements as part of their radon certification programs. The States should be consulted directly for details on their programs; see Section 5 for a list of State radon contacts). The RCP Program measures the proficiency of an individual contractor, not their company. Therefore, users of the report who select a mitigation firm should ensure that the services are provided by the listed contractor. The National RCP Program does not accredit mitigation contractors, nor does it certify, recommend, or endorse participating companies. Only the listed contractor, not their company of affilation, are deemed proficient. The inclusion of a contractor in the report should not be interpreted as a certification or accreditation of the individual or affiliated company

  2. Special training of shift personnel

    International Nuclear Information System (INIS)

    Martin, H.D.

    1981-01-01

    The first step of on-the-job training is practical observation phase in an operating Nuclear Plant, where the participants are assigned to shift work. The simulator training for operating personnel, for key personnel and, to some extent, also for maintenance personnel and specialists give the practical feeling for Nuclear Power Plant behaviour during normal and abnormal conditions. During the commissioning phase of the own Nuclear Power Plant, which is the most important practical training, the participants are integrated into the commissioning staff and assisted during their process of practical learning by special instructors. The preparation for the licensing exams is vitally important for shift personnel and special courses are provided after the first non-nuclear trial operation of the plant. Personnel training also includes performance of programmes and material for retraining, training of instructors and assistance in building up special training programmes and material as well as training centers. (orig./RW)

  3. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  4. Exposing government response action contractors to environmental tort liability

    International Nuclear Information System (INIS)

    Roy, M.J.

    1991-01-01

    Government contractors, particularly those involved with hazardous waste response action activities, are encountering increased risks for environmental tort liabilities. Contracts often include tasks and work assignments requiring the management of industrial, chemical, nuclear or mining wastes, spent fuels, munitions or other toxic substances. Contractors exposure to liability for damages results directly from the environmental laws and regulations pursuant to which the Government has contracted them to respond. Additionally, contractors may be exposed to common law liability under such dogmas as nuisance, trespass and strict liability in tort

  5. Application of integrated fuzzy VIKOR & AHP methodology to contractor ranking

    Directory of Open Access Journals (Sweden)

    Mohamad Rahim Ramezaniyan

    2012-08-01

    Full Text Available Contractor selection is a critical activity, which plays an important role in the overall success of any construction project. The implementation of fuzzy multiple criteria decision attribute (MCDA in selecting contractors has the advantage of rendering subjective and implicit decision making more objective and transparent. An additional merit of fuzzy MCDA is the ability to accommodate quantitative and qualitative information. In this paper, an integrated VIKOR–AHP methodology is proposed to make a selection among the alternative contractors in one of Iranian construction industry projects. In the proposed methodology, the weights of the selection criteria are determined by fuzzy pairwise comparison matrices of AHP.

  6. 2005 River Corridor Cleanup Contractor Revegetation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    A. L. Johnson

    2005-09-12

    This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

  7. Contractors on the Battlefield Force Multipliers or Force Dividers?

    National Research Council Canada - National Science Library

    Nelson, Kim

    2000-01-01

    .... An increased reliance on contractor support has helped ease the burden on a heavily reduced force structure, but has left military commanders vulnerable to declaring a non-mission capable status during times of crisis...

  8. Highway vehicle systems contractors coordination meeting. Seventeenth summary report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Separate abstracts was prepared for each of the 62 papers presented at the Contractors' Coordination meeting on highway vehicle systems. One paper had previously appeared in DOE's data base.

  9. Defense Trade Contractors Engage in Varied International Alliances

    National Research Council Canada - National Science Library

    2000-01-01

    .... Generally, two or more companies form a team by negotiating an agreement to work together to pursue a particular government procurement, with one company acting as the primary contractor and others as subcontractors...

  10. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  11. Contractors' Support of U.S. Operations in Iraq

    National Research Council Canada - National Science Library

    Frisk, Daniel; Trunkey, R. D; Talaber, Adam; Adedeji, Adebayo; Liu, Victoria; Dennis, Robert; Gullo, Theresa; Sammartino, Frank; Murphy, Robert; Elsea, Jennifer

    2008-01-01

    .... This paper, which covers the period from 2003 through 2007, provides an overview of the federal costs of employing contractors in Iraq and in nearby countries, the type of products and services...

  12. 40 CFR 35.938-6 - Progress payments to contractors.

    Science.gov (United States)

    2010-07-01

    ... on nor diverted to another job; and (iii) A fabrication period of more than 6 months is anticipated...: (i) A first payment upon submission by the prime contractor of shop drawings for the equipment or...

  13. Agencies Need Improved Financial Data Reporting for Private Security Contractors

    National Research Council Canada - National Science Library

    Warren, David R; Bianco, Michael A; Nasser, Waheed; Kusman, Richard R; Shafer, James; Venner, Jason; Walls, Lovell Q; Wright, Samson J

    2008-01-01

    Section 842 of the National Defense Authorization Act of 2008 (Public Law 110-181), required SIGIR to, among other things, develop a plan to evaluate various characteristics of contracting for private security contractor services in Iraq...

  14. Highlights of contractor initiatives in quality enhancement and productivity improvement

    Science.gov (United States)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  15. CONTRACTORS OF SOCIALIZATION AND THEIR INFLUENCE ON SOCIAL PROCESSES

    OpenAIRE

    Mikhail Yu. POPOV

    2016-01-01

    This article is devoted to the analysis of an essence of the concept "contractors of socialization" and attempt of definition of its place in structure of sociological knowledge. During the solution of this task the author seeks to define destructive nature of influence of contractors of socialization on formation of the personality both at a stage of primary socialization, and in the course of the entire period of its activity. Inclusion of this term in structure of sociological knowledge, a...

  16. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  17. Some problems of NPP personnel training

    International Nuclear Information System (INIS)

    Vajshnis, P.P.; Kumkov, L.P.; Omel'chuk, V.V.

    1984-01-01

    Shortcomings of NPP personnel training are discussed. Development of full-scale training systems is necessary for qualitative training operative personnel. Primary problems that should be necessarily solved for ensuring effective training NPP personnel are considered

  18. Energy Requirements of Military Personnel

    National Research Council Canada - National Science Library

    Tharion, William J; Lieberman, Harris R; Montain, Scott J; Young, Andrew J; Baker-Fulco, Carol J

    2005-01-01

    ...) have been measured while training under various conditions. Group mean total energy expenditures for 424 male military personnel from various units engaged in diverse missions ranged from 13.0 to 29.8 MJ per day...

  19. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  20. Personnel monitoring in geologic fields

    International Nuclear Information System (INIS)

    Romanova, I.N.; Seredin, Yu.V.

    1981-01-01

    State of radiation safety for the personnel of geologic crews carrying out neutron logging of wells using Po-Be sources has been evaluated. Given are results of development of methods for the evaluation of individual radiation loads for personnel when working with Po-Be neutron sources useful for the application in practice by a geologic logging crew as well as a quantitative evaluation of profissional radiation loads during this kind of work. The following methods are recommended for personnel monitoring: 1) calculation of whole-body irradiation doses and hands from averaged values of radiation dose rate; 2) calculational tabulated determination of irradiation doses during recharging of shanks of well instruments. Personnel monitoring by means of instrumental methods is not necessary in the considered case [ru

  1. Transportation security personnel training manual

    International Nuclear Information System (INIS)

    1978-11-01

    Objective of this manual is to train security personnel to protect special nuclear materials and nuclear facilities against theft and sabotage as required by 10 CFR Part 73. This volume contains the introduction and rationale

  2. Office of Personnel Management (OPM)

    Data.gov (United States)

    Social Security Administration — The purpose of this agreement is for SSA to verify SSN information for the Office of Personnel Management. OPM will use the SSN verifications in its investigative...

  3. Personnel external dose monitoring system

    International Nuclear Information System (INIS)

    Zhao Hengyuan

    1989-01-01

    The status and trend of personnel external dose monitoring system are introduced briefly. Their characteristics, functions and TLD bedges of some commercially available automatic TLD system, including UD-710A (Matsushita, Japan), Harshaw-2271, 2276 (Harshaw, USA), Harshaw-8000 (Harshaw/Filtrol), Studsvik-1313 (Sweden) and Pitman-800 (UK) were depicted in detail. Finally, personnel dose management and record keeping system were presented and two examples were given

  4. THEORETICAL BASIS FOR MANAGEMENT OF PERSONNEL RISKS

    OpenAIRE

    Haliashova, Katsiaryna

    2017-01-01

    Necessity of personnel risks management is based on research results. The authors' approaches to the determination of personnel risks and to their management have been explored. The author's definition of the concept of "personnel risks" is proposed. A classification of personnel risks is developed depending on the stage of origin and the tasks of the personnel policy, as well as the methods of management personnel risks in the organization. The article presents a methodical approach to perso...

  5. 42 CFR 405.874 - Appeals of CMS or a CMS contractor.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Appeals of CMS or a CMS contractor. 405.874 Section... Part B Program § 405.874 Appeals of CMS or a CMS contractor. A CMS contractor's (that is, a carrier... supplier enrollment application. If CMS or a CMS contractor denies a provider's or supplier's enrollment...

  6. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  7. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  8. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Science.gov (United States)

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  9. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Science.gov (United States)

    2010-07-01

    ... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and...

  10. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor... instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting...

  11. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  12. Development of a stand-alone microcomputer based DOE contractor generic radiation worker safety course

    International Nuclear Information System (INIS)

    Klos, D.B.; Gardner, P.R.

    1985-01-01

    Westinghouse Hanford Company (WHC) has developed Computer Based Training (CBT) materials for radiation and industrial safety. First released for general Fast Flux Test Facility in November, 1984. This course has now been taken by nearly 350 people. Completion times for new personnel average around eight hours. The next project undertaken was construction of a Radiation Worker Safety course generic enough for use by all contractors at the Hanford site. The design process of the Hanford site course indicated that the quantity of ''DOE common material'' may be sufficient to warrant consideration of a larger target population. Specifically, the course will be designed to run on an IBM-PC or compatible computer having 256K RAM, a standard IBM color graphics card or equivalent, a color graphics monitor, and two floppy disk drives or one hard disk. The target student population includes those who routinely work in Radiation Areas, especially crafts people. We are not targeting Health Physics personnel, except, possibly, for introductory training, nor are we directing the course toward ''casual'' or escorted workers

  13. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    Science.gov (United States)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  14. Cytogenic Investigations in Flight Personnel

    International Nuclear Information System (INIS)

    Wolf, G.; Obe, G.; Bergau, L.

    1999-01-01

    During long-distance flights at high altitudes flight personnel are exposed to cosmic radiation. In order to determine whether there are biological effects of such low dose radiation exposure in aircrew, chromosomal aberrations were investigated in 59 female cabin attendants and a matched control group of 31 members of station personnel. The mean number of dicentric chromosomes amounts to 1.3 (95% CI 1.0-1.6) per 1,000 cells in cabin attendants and 1.4 (95% CI 1.0-1.9) per 1,000 cells in controls. In an additional control group of 56 female clerks from Berlin the mean frequency of dicentric chromosomes was 1.3 (95% CI 1.0-1.6). Neither in dicentric frequency and distribution nor in other aberrations was a significant difference between the groups of flight and station personnel found. The high frequency of multi-aberrant cells was remarkable in flight personnel as well as in station personnel. The reason for this phenomenon is unknown and needs further investigation. (author)

  15. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    Science.gov (United States)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  16. Selection of disposal contractor by multi criteria decision making methods

    Directory of Open Access Journals (Sweden)

    Cenker Korkmazer

    2016-08-01

    Full Text Available Hazardous waste is substance that threaten people and environment in case of improper storage, disposal and transport due to its concentration, physical and chemical properties. Companies producing hazardous waste as a result of several activities mostly do not have any own disposal facilities. In addition, they do not pay attention enough to determine the right contractor as a disposal facility. On the other hand, there are various qualitative and quantitative criteria affecting the selection of the contractor and conflicting with each other. The aim of the performed study is to assist one of these companies producing hazardous waste in the selection of the best contractor that eliminates hazardous waste economic and harmless way. In the study, contractor weights in percentage is calculated by using Analytic Network Process (ANP as one of the multi-criteria decision making (MCDM methods and widely used in the literature which considers both qualitative and quantitative criteria. In the next step, by the help of the mathematical model, contractors that will be given which type of hazardous waste are identified. This integrated approach can be used as a guide for similar firms.

  17. 76 FR 81359 - National Security Personnel System

    Science.gov (United States)

    2011-12-28

    ... Security Personnel System AGENCY: Department of Defense; Office of Personnel Management. ACTION: Final rule... concerning the National Security Personnel System (NSPS). Section 1113 of the National Defense Authorization... National Security Personnel System (NSPS) in regulations jointly prescribed by DOD and OPM (Office of...

  18. Training of research reactor personnel

    International Nuclear Information System (INIS)

    Cherruau, F.

    1980-01-01

    Research reactor personnel operate the reactor and carry out the experiments. These two types of work entail different activities, and therefore different skills and competence, the number of relevant staff being basically a function of the size, complexity and versatility of the reactor. Training problems are often reactor-specific, but the present paper considers them from three different viewpoints: the training or retraining of new staff or of personnel already employed at an existing facility, and training of personnel responsible for the start-up and operation of a new reactor, according to whether local infrastructure and experience already exist or whether they have to be built up from scratch. On-the-spot experience seems to be an essential basis for sound training, but requires teaching abilities and aids often difficult to bring together, and the availability of instructors that does not always fit in smoothly with current operational and experimental tasks. (author)

  19. Requirements on qualification, competence and sufficient number of personnel for NPP operation

    International Nuclear Information System (INIS)

    Simon, M.

    2004-01-01

    fulfilled to have sufficient competent staff and a sufficient number of plant personnel on site. Criteria were also developed to define the borderline for employment of plant external personnel and contractors.(author)

  20. Personnel Management theories and applications

    Institute of Scientific and Technical Information of China (English)

    Yanni Feng

    2010-01-01

    @@ 1.Introduction Many new businesses are opened in the whole world every day.Unfortunately,only a minor part of them has success and continues its activity.There is a variety of reasons which determine the hankruptcy of companies.Most of them are included in running a business,and more and more people come to realize the significance of management,especially personnel management,as personnel represents the relationship between people in the company,which is a key point for the development of enterprise.

  1. Ethnic Minority Personnel Careers: Hindrances and Hopes

    OpenAIRE

    Ross, Catharine

    2004-01-01

    Personnel departments often have particular responsibility for equal opportunities within their organizations. This paper explores equal opportunities within personnel departments themselves, in relation to the careers of ethnic minority personnel practitioners. Through primary research, it identifies a range of criteria which can affect personnel careers, of which ethnic origin is often one. However, although being categorized as of ethnic minority origin often hinders personnel careers, the...

  2. Basis scheme of personnel training system

    International Nuclear Information System (INIS)

    Rerucha, F.; Odehnal, J.

    1998-01-01

    Basic scheme of the training system for NPP personnel of CEZ-EDU personnel training system is described in detail. This includes: specific training both basic and periodic, and professional training meaning specialized and continuous training. The following schemes are shown: licence acquisition and authorisation for PWR-440 Control Room Personnel; upgrade training for job positions of Control Room personnel; maintaining and refresh training; module training for certificate acquisition of servicing shift and operating personnel

  3. International Markets: Malaysian Construction Contractors and the Stage Theory

    Directory of Open Access Journals (Sweden)

    Ahmed Awil

    2012-11-01

    Full Text Available Reduced demand for services, lack of finances for projects and idle resources at homehave resulted in loss of business for Malaysian construction contractors. Among the optionsthat are explored in this paper is internationalisation of services to help the contractorsgainfully employ their resources and diversify their markets. Integration of worldmarkets, faster transportation and improved means of communication have made it possiblefor contractors to undertake work in international markets. It was found that contractorswere motivated to internationalise by need to make the firm a viable one byconsidering the long-term profitability. Reputation and size of the firm were found to befactors that help contractors in winning contracts overseas. Most non-exporters were concernedwith provision of market intelligence and export credit finance. It was found thatproviding relevant market information, accessible to both exporter and non-exporters, canhelp firms make informed decisions. Any assistance provided should match the firm to thestage the firm has reached in exporting

  4. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Catton, C.

    1998-01-01

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  5. Private security and military contractors: A troubling oversight

    DEFF Research Database (Denmark)

    Swed, Ori; Crosbie, Thomas Alexander

    2017-01-01

    Though private military and security companies (PMSCs) have been addressed extensively in the literature, little research has been done on the contractors themselves, leaving us in the dark as to who these individuals are. In this article, we focus on the critical case of the United States armed...... and concomitant evolution of the security sector, while noting a new trend that points to the need for moving from the macrosocial to the microsocial level of inquiry. Second, we indicate the challenges contractors pose to the sociological paradigm of military professionalism: These suggest a need to move from...

  6. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key...

  7. Study of personnel monitoring programs

    International Nuclear Information System (INIS)

    Guerra, Aline B.; Lorenzini, Fabiane; Carlos, Janaina; Bernasiuk, Maria E.B.; Rizzatti, Mara R.; Fuentefria, Jose L.B.

    1996-01-01

    Surveillance of several health institutions who use ionizing radiation sources, as well as data from the state of Rio Grande do Sul (Brazil) are studied concerning the use of personnel dosimeters. The results show that several institutions do not provide them and those which provide do not know how to use them

  8. Rights & Responsibilities. Personnel Management Module.

    Science.gov (United States)

    Barker, Gale; And Others

    This module on rights and responsibilities is intended to introduce the hospitality manager or supervisor to sound personnel management practices that comply with the law. The material is presented in a self-instructional format in seven sections. At the beginning of each section is a statement of the objectives that will be achieved as a result…

  9. Personnel monitoring for beta rays

    International Nuclear Information System (INIS)

    Piesch, E.; Johns, T.F.

    1983-01-01

    The practical considerations which have to be taken into account in the design of personnel monitors intended to measure doses resulting from exposure to beta rays are discussed. These include the measurement of doses in situations involving either fairly uniform or non-uniform irradiation and of doses to the male gonads. (UK)

  10. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  11. South African Private Security Contractors Active in Armed Conflicts ...

    African Journals Online (AJOL)

    Not only is this legislation completely unique, but it appears wholly at odds with international opinion. In this article we place private security contractors (PSCs) under the microscope of international law, exploring the role they play in armed conflicts, and the status afforded them by international humanitarian law (IHL).

  12. DOE Human Genome Program contractor-grantee workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  13. Radiation exposures for DOE and DOE contractor employees, 1987

    International Nuclear Information System (INIS)

    1989-10-01

    This report is one of series of annual reports provided by the US Department of Energy (DOE) summarizing occupational radiation exposures received by DOE and DOE contractor employees. These reports provide an overview of radiation exposures received each year, as well as identification of trends in exposures being experienced over the years. 5 figs., 30 tabs

  14. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  15. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  16. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Science.gov (United States)

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating (M&O...

  17. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  18. 75 FR 69037 - Medicaid Program; Recovery Audit Contractors

    Science.gov (United States)

    2010-11-10

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services 42 CFR Part 455 [CMS-6034-P] RIN 0938-AQ19 Medicaid Program; Recovery Audit Contractors AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Proposed rule. SUMMARY: This proposed rule would provide guidance to...

  19. Assessing the readiness of contractors in implementing low carbon ...

    African Journals Online (AJOL)

    For the implementation of low carbon construction in our construction industry, the contractors need to be ready and have knowledge to adopt low carbon construction ... A checklist was established by summarizing the highest low carbon activities from each category which were sustainable site planning and management, ...

  20. 77 FR 54864 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2012-09-06

    ....g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report... applicable) (e.g.; late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to... that allowing contractors to ``report to the CPARS system'' would have a negative impact on future...

  1. Contractor selection: a quantitative, consensus-friendly, transparent ...

    African Journals Online (AJOL)

    This article offers a method for selecting contractors in an objective, transparent and participative way. The use of the Decision Analysis System (DAS), also referred to as decision-making by objectives, makes it possible that a large number of objectives can be taken into account to select the best amongst a wide range of ...

  2. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  3. 78 FR 12106 - Debarment, Suspension, and Ineligibility of Contractors

    Science.gov (United States)

    2013-02-21

    ... include a recommendation by the SDC as to a proposed course of action; (2) The debarment decision-making... proposed debarment; (3) The suspension decision-making process, which shall afford the contractor (and any... Management, Contracting; Attention: Contracting Policy, 1900 E Street NW., Washington, DC 20415; or email...

  4. Technical Baseline Summary Description for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    TEDESCHI, A.R.

    2000-01-01

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford

  5. Hand in Glove? Small Building Contractors, Mobile Technology and Innovation

    DEFF Research Database (Denmark)

    Buser, Martine; Koch, Christian; Tambo, Torben

    2010-01-01

    for construction are developing as well. A recent review shows a small portfolio of systems using mobile computing to support specifically the construction project processes. The aim of this paper is to evaluate the use of mobile computing at small construction contractors. The paper presents a quantitative...

  6. The main factor affecting the competitiveness of Contractor Company

    Science.gov (United States)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  7. 48 CFR 919.7006 - Incentives for DOE contractor participation.

    Science.gov (United States)

    2010-10-01

    ... disadvantaged businesses, women-owned small businesses, HBCUs, other minority institutions of higher learning... contractor participation. 919.7006 Section 919.7006 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919...

  8. 75 FR 3977 - Addressing Tax Delinquency by Government Contractors

    Science.gov (United States)

    2010-01-25

    ... Part II The President Memorandum of January 20, 2010--Addressing Tax Delinquency by Government... of January 20, 2010 Addressing Tax Delinquency by Government Contractors Memorandum for the Heads of... contracts are awarded to tens of thousands of companies with serious tax delinquencies. The total amount in...

  9. Radiation exposures for DOE and DOE contractor employees, 1989

    International Nuclear Information System (INIS)

    Smith, M.H.; Eschbach, P.A.; Harty, R.; Millet, W.H.; Scholes, V.A.

    1992-12-01

    All US Department of Energy (DOE) and DOE contractors, are required to submit occupational radiation exposure records to a central depository. In 1989, data were required to be submitted for all employees who were required to be monitored in accordance with DOE Order 5480.11 and for all visitors who had a positive exposure. The data required included the external penetrating whole-body dose equivalent, the shallow dose equivalent, and a summary of internal depositions of radioactive material above specified limits. Data regarding the exposed individuals included the individual's age, sex, and occupational category. This report is a summary of the external penetrating whole-body dose equivalents and shallow dose equivalents reported by DOE and DOE contractors for the calendar year 1989. A total of 90,882 DOE and DOE contractor employees were reported to have been monitored for whole-body ionizing radiation exposure during 1989. This represents 53.6% of all DOE and DOE contractor employees and is an increase (4.3 %) from the number of monitored employees for 1988. In addition to the employees, 12,643 visitors were monitored

  10. The operation of contractors on nuclear sites: French regulations

    International Nuclear Information System (INIS)

    Mayoux, J.C.; Derche, B.

    1985-01-01

    The first purpose of this paper is to show how the French common law -as it results from the code of labour and holdings of the courts- deals with the intervention of contractors. The second part analyses the special regulations in force to ensure radiation protection [fr

  11. Preaward Evaluation and Responsibility Determination of Foreign Contractors.

    Science.gov (United States)

    1988-12-01

    3 Contractor Country Contract Number Bundesamt Fuer Wehrtechnik FRG DAJA3786C0326 Bundesamt Fuer Wehrtechnik FRG F6154686D0022 Construcciones ...Aeronauticas SA Spain F0960385C0006 Construcciones Aeronauticas SA Spain F4260086C6464 Daimler Benz AG FRG DAJA3778GOO11 Eaton Corp. FRG F0960382D0663

  12. 48 CFR 227.7207 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7207 Section 227.7207 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Computer Software and Computer Software Documentation 227.7207 Contractor data repositories. Follow 227.7108 when it is in the Government's interests to have a data repository include computer software or to...

  13. Outsourcing Wars: Comparing Risk, Benefits and Motivation of Contractors and Military Personnel in Iraq and Afghanistan (2009-2011)

    Science.gov (United States)

    2012-06-01

    Herzberg proposed the two – factor theory , also known as motivation–hygiene theory (Robbins & Judge, 2012). Herzberg conducted an investigation into...17 b. Theory X and Theory Y ...........................................................18 c. Two – Factor Theory ...from this time period are discussed: Maslow’s hierarchy of needs, Theory X and Theory Y, Two – Factor theory and McClelland’s theory

  14. Financial Reporting by Selected Defense Agencies of Government Property in the Custody of Contractors

    National Research Council Canada - National Science Library

    1997-01-01

    ... over the $92 billion of Government property in the custody of contractors. After several years of planning, DoD has not developed a standard accounting system for recording, tracking, and reporting Government property in the custody of contractors...

  15. Contractors In The Theater: Implications For Joint Operational Planning And Execution

    National Research Council Canada - National Science Library

    Binder, Jeanne

    2003-01-01

    The use of contractors in the theater of operations is nothing new. However downsizing efforts and outsourcing as well as the increasing complexity of military equipment has increased military reliance on contractors...

  16. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    National Research Council Canada - National Science Library

    Arnold, Scot A; Harmon, Bruce R; Tyson, Karen W; Fasana, Kenton G; Wait, Christopher S

    2008-01-01

    .... The goal of profit policy is a contract price that reimburses the contractor for its costs, provides the necessary incentives to yield beneficial performance, and to provide the contractor with sufficient risk reward...

  17. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    National Research Council Canada - National Science Library

    Arnold, Scot A; Harmon, Bruce R; Tyson, Karen W; Fasana, Kenton G; Wait, Christopher S

    2009-01-01

    .... The goal of profit policy is a contract price that reimburses the contractor for its costs, provides the necessary incentives to yield beneficial performance, and provides the contractor with sufficient risk reward...

  18. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Science.gov (United States)

    2010-10-01

    ... the Contractor's negligence, indemnification shall be at a rate not to exceed sixty cents per pound per article. (ii) Negligent damage. When loss or damage is caused by the negligence of the Contractor...

  19. Farm Building Contractors and Manufacturers: Their Role in Midwest Farm Construction

    Science.gov (United States)

    Lyle Solverson; David C. Baumgartner

    1974-01-01

    Describes and analyzes the activities of farm building contractors and manufacturers in Illinois, Indiana, Iowa, and Missouri. Contractors and manufacturers are setting the trend in the farm building market in terms of building type and size and materials used.

  20. Government/contractor partnerships for continuous improvement. A Goddard Space Flight Center example

    Science.gov (United States)

    Tagler, Richard C.

    1992-01-01

    The efforts of a government organization and its major contractors to foster a continuous improvement environment which transcends the traditional government/contractor relationship is discussed. This relationship is aimed at communication, partnership, and trust - creating benefits for all involved.

  1. 76 FR 27648 - Submission for OMB Review; Preventing Personal Conflicts of Interest for Contractor Employees...

    Science.gov (United States)

    2011-05-12

    ...; Preventing Personal Conflicts of Interest for Contractor Employees Performing Acquisition Functions AGENCY... approve a new information collection requirement regarding Preventing Personal Conflicts of Interest for... Conflicts of Interest for Contractor Employees Performing Acquisition Functions by any of the following...

  2. The Inadequacy of Existing Far Provisions to Ensure Contractor Environmental Compliance

    National Research Council Canada - National Science Library

    MacDonald, Edward

    1997-01-01

    This thesis focuses on situations where the obligation is on the contractor, and examines the existing FAR provisions and clauses to explore whether they are adequate to ensure government contractor...

  3. Essential themes in Personnel economics

    OpenAIRE

    Josheski, Dushko

    2014-01-01

    In this paper are presented essential themes in the subject of personnel economics. In the first part analysis has been conducted on the impact of peer pressure on workplace behaviour. Then again models for compensation structures within firms, and their influence on the utility of work by employees. In the final section of the paper the productivity spillover effect has been analyzed, and the causes of existence of spillovers and their impact on workers’ productivity

  4. Modern methods of personnel dosimetry

    International Nuclear Information System (INIS)

    Kraus, W.; Herrmann, D.; Kiesewetter, W.

    The physical properties of radiation detectors for personnel dosimetry are described and compared. The suitability of different types of dosimeters for operational and central monitoring of normal occupational exposure, for accident and catastrophe dosimetry and for background and space-flight dosimetry is discussed. The difficulties in interpreting the dosimeter reading with respect to the dose in individual body organs are discussed briefly. 430 literature citations (up to Spring 1966) are given

  5. The LHC personnel safety system

    International Nuclear Information System (INIS)

    Ninin, P.; Valentini, F.; Ladzinski, T.

    2011-01-01

    Large particle physics installations such as the CERN Large Hadron Collider require specific Personnel Safety Systems (PSS) to protect the personnel against the radiological and industrial hazards. In order to fulfill the French regulation in matter of nuclear installations, the principles of IEC 61508 and IEC 61513 standard are used as a methodology framework to evaluate the criticality of the installation, to design and to implement the PSS.The LHC PSS deals with the implementation of all physical barriers, access controls and interlock devices around the 27 km of underground tunnel, service zones and experimental caverns of the LHC. The system shall guarantee the absence of personnel in the LHC controlled areas during the machine operations and, on the other hand, ensure the automatic accelerator shutdown in case of any safety condition violation, such as an intrusion during beam circulation. The LHC PSS has been conceived as two separate and independent systems: the LHC Access Control System (LACS) and the LHC Access Safety System (LASS). The LACS, using off the shelf technologies, realizes all physical barriers and regulates all accesses to the underground areas by identifying users and checking their authorizations.The LASS has been designed according to the principles of the IEC 61508 and 61513 standards, starting from a risk analysis conducted on the LHC facility equipped with a standard access control system. It consists in a set of safety functions realized by a dedicated fail-safe and redundant hardware guaranteed to be of SIL3 class. The integration of various technologies combining electronics, sensors, video and operational procedures adopted to establish an efficient personnel safety system for the CERN LHC accelerator is presented in this paper. (authors)

  6. Career path for operations personnel

    International Nuclear Information System (INIS)

    Asher, J.A.

    1985-01-01

    This paper explains how selected personnel can now obtain a Bachelor of Science degree in Physics with a Nuclear Power Operations option. The program went into effect the Fall of 1984. Another program was worked out in 1982 whereby students attending the Nuclear Operators Training Program could obtain an Associates of Science degree in Mechanical Engineering Technology at the end of two years of study. This paper presents tables and charts which describe these programs and outline the career path for operators

  7. Moral distress in nursing personnel

    OpenAIRE

    Barlem,Edison Luiz Devos; Lunardi,Valéria Lerch; Lunardi,Guilherme Lerch; Tomaschewski-Barlem,Jamila Geri; Silveira,Rosemary Silva da; Dalmolin,Graziele de Lima

    2013-01-01

    OBJECTIVE: to analyze the frequency and intensity of moral distress experienced by nursing personnel in southern Brazil, covering elements of their professional practice. METHOD: a survey was undertaken in two hospitals in Rio Grande do Sul, Brazil, with 247 nurses. Data was collected by means of the adapted Moral Distress Scale. RESULTS: the perception of situations that lead to moral distress is enhanced in nurses and in nursing staff working in institutions with greater openness to dialogu...

  8. US Department of Energy Laboratory Accreditation Program for personnel dosimetry systems (DOELAP)

    International Nuclear Information System (INIS)

    Carlson, R.D.; Gesell, T.F.; Kalbeitzer, F.L.; Roberson, P.L.; Jones, K.L.; MacDonald, J.C.; Vallario, E.J.; Pacific Northwest Lab., Richland, WA; USDOE Assistant Secretary for Nuclear Energy, Washington, DC

    1988-01-01

    The US Department of Energy (DOE) Office of Nuclear Safety has developed and initiated the DOE Laboratory Accreditation Program (DOELAP) for personnel dosimetry systems to assure and improve the quality of personnel dosimetry at DOE and DOE contractor facilities. It consists of a performance evaluation program that measures current performance and an applied research program that evaluates and recommends additional or improved test and performance criteria. It also provides guidance to DOE, identifying areas where technological improvements are needed. The two performance evaluation elements in the accreditation process are performance testing and onsite assessment by technical experts. Performance testing evaluates the participant's ability to accurately and reproducibly measure dose equivalent. Tests are conducted in accident level categories for low- and high-energy photons as well as protection level categories for low- and high-energy photons, beta particles, neutrons and mixtures of these

  9. Personnel exposures in industrial radiography

    International Nuclear Information System (INIS)

    Shenoy, K.S.; Patel, P.H.

    1979-01-01

    The manifold increase in production, and ease of availability of radioisotopes in India have been responsible for a tremendous increase in use of radioisotopes in industrial radiography during past fifteen years. Among various applications of radioisotopes the industrial radiography involves a large potential risk of occupational radiation exposures. The dose records of past fifteen years in respect of all radiation workers maintained by the Personnel Monitoring Group of Division of Radiological Protection of the Bhabha Atomic Research Centre, Bombay, have been analysed. Analysis of excessive exposure (exceeding 400 mrem/fortnight) reveals that this figure is increasing at an alarming rate among the radiation workers of this category. In spite of various regulatory controls the dose per person per week has remained higher as compared to the same in other categories. This combined with the increase in number of radiation workers every year would soon contribute significantly to the per capita dose for radiation workers. Use of adequately shielded fool-proof remote control equipment and training of all personnel in safe handling of radiation sources seem to be the only solution to arrest the rate of increase in personnel exposures of this category. (auth.)

  10. National Finance Center Personnel/Payroll System

    Data.gov (United States)

    US Agency for International Development — The NFC system is an USDA system used for processing transactions for payroll/personnel systems. Personnel processing is done through EPIC/HCUP, which is web-based....

  11. 77 FR 20051 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-04-03

    ... Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor Pursuant to... ``Procedural Guidelines for the Maintenance of the List of Products Requiring Federal Contractor Certification... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor...

  12. 76 FR 31365 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2011-05-31

    ... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor... Contractor Certification as to Forced or Indentured Child Labor.'' This notice adds a product, hand-woven... of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child...

  13. 42 CFR 405.1010 - When CMS or its contractors may participate in an ALJ hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may participate in an... Hearings § 405.1010 When CMS or its contractors may participate in an ALJ hearing. (a) An ALJ may request, but may not require, CMS and/or one or more of its contractors to participate in any proceedings...

  14. 48 CFR 852.236-72 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...

  15. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  16. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  17. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-11-24

    ... Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025... conducting a Contractor Insurance/Pension Review from Procedures, Guidance, and Information (PGI) to the... This final rule relocates requirements for Contractor Insurance/ Pension Review to DFARS 242.7302 from...

  18. 75 FR 10267 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Motor...

    Science.gov (United States)

    2010-03-05

    ... ADMINISTRATION [OMB Control No. 9000-0032] Federal Acquisition Regulation; Submission for OMB Review; Contractor... previously approved information collection requirement concerning contractor use of interagency motor pool... contracting officer may authorize cost-reimbursement contractors to obtain, for official purposes only...

  19. 78 FR 6189 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2013-01-29

    ... 9000-AM13 Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor... contractor in order to reimburse the tax imposed (26 U.S.C. 5000C Note). On February 22, 2012, DoD, GSA, and... with the statute, FAR 31.205-41 is amended to inform the Government and contractors that the costs of...

  20. 77 FR 65927 - 60-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2012-10-31

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment... Collection: Office of Language Services Contractor Application Form. OMB Control Number: 1405-0191. Type of... become contractors for the U.S. Department of State, Office of Language Services, the information...

  1. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Science.gov (United States)

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  2. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...

  3. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Science.gov (United States)

    2011-11-02

    ... Contractor Employees Performing Acquisition Functions AGENCIES: Department of Defense (DoD), General Services... personal conflicts of interest by employees of Government contractors as required by statute. DATES... clause for future orders. In the event that a contractor refuses to accept such a modification, the...

  4. 75 FR 55671 - Financial Assistance Use of Universal Identifier and Central Contractor Registration

    Science.gov (United States)

    2010-09-14

    ... of Universal Identifier and Central Contractor Registration AGENCY: Office of Federal Financial...) numbers and maintain current registrations in the Central Contractor Registration (CCR) database. An... CONTRACTOR REGISTRATION Sec. Subpart A--General 25.100 Purposes of this part. 25.105 Types of awards to which...

  5. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2012-10-05

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 2 [FRL-9733-8] Clean Water Act; Contractor Access to... transfer of confidential business information to contractor, subcontractors, and consultants. SUMMARY: The... certain industries. We have determined that the contractors listed below require access [[Page 60963

  6. 76 FR 52378 - Privacy Act; System of Records: State-76, Personal Services Contractor Records

    Science.gov (United States)

    2011-08-22

    ... Services Contractor Records SUMMARY: Notice is hereby given that the Department of State proposes to create a new system of records, Personal Services Contractor Records, State-76, pursuant to the provisions... July 20, 2011. It is proposed that the new system be named ``Personal Services Contractor Records.'' It...

  7. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  8. 78 FR 13394 - 30-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2013-02-27

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment and...: Title of Information Collection: Office of Language Services Contractor Application Form. OMB Control... States. If candidates successfully become contractors for the U.S. Department of State, Office of...

  9. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...

  10. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Science.gov (United States)

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  11. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  12. 77 FR 10461 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2012-02-22

    ... Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise Tax AGENCIES.... Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in order to... payment. Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in...

  13. 76 FR 20661 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-04-13

    ... Activities; Proposed Collection; Comment Request; Contractor Conflicts of Interest AGENCY: Environmental....regulations.gov . Title: Contractor Conflicts of Interest. ICR numbers: EPA ICR No. 1550.09, OMB Control No... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors...

  14. 76 FR 4343 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-01-25

    ...; Contractor Conflicts of Interest AGENCY: Environmental Protection Agency. ACTION: Notice. SUMMARY: In... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors... cleanup and enforcement and because its contractors are often involved in both activities, it is...

  15. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2013-12-31

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9904-94-OW] Clean Water Act; Contractor Access to... Transfer of Confidential Business Information to Contractor, Subcontractors, and Consultants. SUMMARY: The... contractors listed below require access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA...

  16. 76 FR 81490 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-12-28

    ... Activities; Proposed Collection; Comment Request; Contractor Cumulative Claim and Reconciliation (Renewal... identify the Docket ID Number EPA-HQ-OARM-2011-0997, Contractor Cumulative Claim and Reconciliation. Hand... information collection activity or ICR does this apply to? Affected entities: All contractors who have...

  17. 10 CFR 36.55 - Personnel monitoring.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Personnel monitoring. 36.55 Section 36.55 Energy NUCLEAR REGULATORY COMMISSION LICENSES AND RADIATION SAFETY REQUIREMENTS FOR IRRADIATORS Operation of Irradiators § 36.55 Personnel monitoring. (a) Irradiator operators shall wear a personnel dosimeter that is...

  18. 49 CFR 193.2711 - Personnel health.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Personnel health. 193.2711 Section 193.2711 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY...: FEDERAL SAFETY STANDARDS Personnel Qualifications and Training § 193.2711 Personnel health. Each operator...

  19. Personnel Development Practices in Turkish Education System

    Science.gov (United States)

    Ozdemir, Tuncay Yavuz

    2016-01-01

    Nowadays everything develops and changes very quickly and sustainability of organizational goals will be possible only when personnel can keep up with these changes. From administrative aspect it is important to enhance personnel's potential and prompt them to achieve organizational goals. Personnel development is a process which influences and…

  20. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  1. DOE contractor radiation safety CBT [computer based training] course

    International Nuclear Information System (INIS)

    Gardner, P.R.

    1986-01-01

    Westinghouse Hanford Company developed a generic Radiation Worker safety CBT course for Department of Energy contractors. Task analysis concentrated on actual and potential tasks and included visits to fourteen different contractor sites. Team Design and Prototype verification formed the major portion of the development phase. Lesson entry was accomplished using the WISE author system from WICAT Systems, Inc. The course features graded task simulations for both Pretest and Final; fourteen Topics in five Lessons, each Topic keyed to ''Critical Acts'' and Questions in the Pretest and Final; Automatic, Intensive, and Manual modes of instruction available for each Lesson; Practical Problems and Sample Questions associated with each Topic; and provisions for local configuration in several areas. The course is deliverable on IBM PC compatible equipment. 2 refs

  2. 2006 Fundamental Research Underlying Solid-State Lighting: Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kini, Arvind [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kelley, Dick [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-02-01

    This volume highlights the scientific content of the 2006 Fundamental Research Underlying Solid-State Lighting Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) in the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). This meeting is the second in a series of research theme-based Contractors Meetings and will focus on BES/DMS&E-funded research that underpins solid-state lighting technology. The meeting will feature research that cuts across several DMS&E core research program areas. The major programmatic emphasis is on developing a fundamental scientific base, in terms of new concepts and new materials that could be used or mimicked in designing novel materials, processes or devices.

  3. Operator/contractor teamwork is the key to performance improvement

    International Nuclear Information System (INIS)

    Robins, K.B.; Roberts, J.D.M.

    1996-01-01

    The contract strategies developed by the two major E and P companies operating in the North Sea emphasize teamwork between operator and contractors to achieve the common goal of maximizing project value. These strategies have had significant repercussions across the whole industry. This paper compares these strategies and concludes that although they are structurally different, they have the same fundamental objectives. It describes the evolution of what these operators consider to be their core business, with the resultant changing roles for both operator and contractor staff. Several examples of results achieved through implementing these changes are described, highlighting the need for a structured performance measurement system to quantify the success of these initiatives. Finally, the potential for even greater efficiency improvements through further industry-wide cooperation is emphasized

  4. United States extension of indemnification to utilities and contractors

    International Nuclear Information System (INIS)

    Cunningham, G.

    1988-01-01

    This chapter discusses the status of the Price-Anderson Act which provides a means of compensation for members of the public who may be injured as a result of a nuclear incident at a licensed commercial power plant or a facility of the United States Government operated by a contractor. It describes the course of bills to extend the Act in 1987 and analyses some of the major issues of the debate (NEA) [fr

  5. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Duvon, D. K.

    1998-01-01

    This plan contains the Pollution Prevention (P2) Program for the Environmental Restoration Contractor (ERC). The plan outlines the activities and schedules developed by the Bechtel Hanford, Inc.(BHI) to reduce the quantity and toxicity of waste dispositioned as a result of restoration and remediation activities. The purpose of this plan is to guide ERC projects in meeting and documenting compliance with requirements for pollution prevention. This plan contains the objectives, strategy, and support activities of the ERC P2 Program

  6. Financial Planning and Management Practices of Electrical Contractors

    Directory of Open Access Journals (Sweden)

    Lucko Gunnar

    2016-12-01

    Full Text Available Contractors must carefully manage their cash outflows (e.g., for materials to enable their work and inflows (after the work to be profitable, particularly in an economy that is still recovering from the 2008-2012 recession that grew out of the mortgage crisis. Their importance for business success is undisputed, as bankruptcies due to insufficient cash flow underline. Therefore, this study investigated current business practices of electrical contracting companies of different sizes with respect to their financial planning and management. A detailed questionnaire was developed with best guidelines on survey studies and pilot testing. It was sent to members of the National Electrical Contractors Association. Respondent anonymity was ensured. The survey recorded demographics, business practices, operating conditions, and other important factors using 57 subquestions. Each section allowed feedback to clarify the numerical responses. Responses were well distributed across company sizes, so that the results are representative for the entire industry. The results indicated that contractors generally have a substantial amount of experience in financial decision making. Their approach is conservative and focuses on healthy growth. Yet, opportunities to fine-tune business practices are identified, e.g., immediate invoicing, considering discounts to accelerate payment receipts, attempting to negotiate and use favorable credit terms, reviewing payment performance, and performing frequent cash flow forecasts. Some of the differences in the responses can be attributed to different company sizes. To help especially smaller companies in planning their cash flow, a spreadsheet for implementation has been created.

  7. Burnout among Danish prison personnel

    DEFF Research Database (Denmark)

    Andersen, Dorte Raaby; Andersen, Lars Peter; Gadegaard, Charlotte Ann

    2017-01-01

    Objectives The objective of this follow-up study was to investigate associations between individual, occupational and work environment factors and burnout among both uniformed and non-uniformed personnel working in the Danish Prison and Probation Service. Methods The participants (N = 4808......) with client contact received a questionnaire in 2010 and again in 2011. In 2010, 2843 participants responded to the questionnaire (59.1%), and in 2011, 1741 responded to the questionnaire, yielding a response rate of 61.2% of the baseline population, and 36.2% of the invited population. Burnout and work...... characteristics were measured with validated scales from the Copenhagen Psychosocial Questionnaire, and data was analysed by logistic regression. Results Risk factors with the highest impact on burnout were work environmental factors: quantitative demands, emotional demands, involvement in and meaning of work...

  8. The Daresbury personnel safety system

    International Nuclear Information System (INIS)

    Poole, D.E.; Ring, T.

    1989-01-01

    The personnel safety system designed for the SRS at Daresbury is a unified system covering the three accelerators of the source itself, the beamlines and the experimental stations. The system has also been applied to the experimental areas of the Nuclear Structure Facility, and is therefore established as a site standard. A dual guardline interlock module forms a building block for a relay based interlock system completely independent of the machine control system, although comprehensive monitoring of the system status via the control system computer is a feature. An outline of the design criteria adopted for the system is presented together with a more detailed description of the philosophy of the guardline logic and the way this is implemented in a standard modular form. The emphasis is on the design features of a modern microprocessor based variant of the original SRS system. Experience with the original system during build-up and operation of the SRS facility is described. 2 refs., 4 figs

  9. Director general presentation to personnel

    CERN Multimedia

    2016-01-01

    Dear Colleagues, Many important discussions are scheduled for the upcoming Council Week (13-17 June) on topics including the Medium-Term Plan, the Pension Fund and other matters of great relevance to us.   I would therefore like to share the main outcome of the week with you and I invite you to join me and the Directors in the Main Auditorium at 10 a.m. on Thursday 23 June. The meeting will last about one hour and a webcast will also be available. Best regards, Fabiola Gianotti DG presentation to personnel Thursday 23 June at 10 am Main Auditorium Retransmission in Council Chamber, IT Auditorium, Kjell Jonhsen Auditorium, Prevessin 864-1-C02 Webcast on cern.ch/webcast More information on the event page.

  10. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-10-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor`s status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  11. Department of Defense Civilian Personnel Manual

    National Research Council Canada - National Science Library

    1996-01-01

    .... It implements policy, establishes uniform DoD-wide procedures, provides guidelines and model programs, delegates authority, and assigns responsibilities regarding civilian personnel management within...

  12. Musculoskeletal disorders in main battle tank personnel

    DEFF Research Database (Denmark)

    Nissen, Lars Ravnborg; Guldager, Bernadette; Gyntelberg, Finn

    2009-01-01

    PURPOSE: To compare the prevalence of musculoskeletal disorders of personnel in the main battle tank (MBT) units in the Danish army with those of personnel in other types of army units, and to investigate associations between job function in the tank, military rank, and musculoskeletal problems......, and ankle. RESULTS AND CONCLUSIONS: There were only 4 women in the MBT group; as a consequence, female personnel were excluded from the study. The participation rate was 58.0% (n = 184) in the MBT group and 56.3% (n = 333) in the reference group. The pattern of musculoskeletal disorders among personnel...

  13. Khmelnitsky NPP personnel training system improvement

    International Nuclear Information System (INIS)

    Sapronov, V.G.; Issupov, V.I.

    1996-01-01

    Khmelnitsky nuclear power plant personnel training system improvement is described, including creation of Training center, development of training courses based on SAT methodology, development of training hardware

  14. Sources of personnel for multinuclear companies

    International Nuclear Information System (INIS)

    Guppy, W.H.

    1975-01-01

    Included are comments and statistics on current employment levels, projected requirements for future stations, sources of personnel for current and projected stations, and methods of employee selection

  15. Office of Personnel Management Catch 62 Match

    Data.gov (United States)

    Social Security Administration — SSA provides the Office of Personnel Management (OPM) with tax returns, Social Security benefits, and military retirement information for the purpose of correctly...

  16. Educating personnel for nuclear technology in Czechoslovakia

    International Nuclear Information System (INIS)

    Otcenasek, P.

    1980-01-01

    The basic preconditions are discussed of educating personnel for nuclear power and nuclear technology in Czechoslovakia. In educating specialists, the high societal significance of nuclear power and the need to obtain qualified personnel for safeguarding safety and reliability of nuclear facilities operation should primarily be borne in mind. The system of training applies not only to operating and maintenance personnel of nuclear power plants but also to fuel and power generation, transport, engineering, building industry, health care, education and other personnel. (J.B.)

  17. The Excessive Profits of Defense Contractors: Evidence and Determinants

    Science.gov (United States)

    2012-04-30

    UNILEVER NV $112,089,508 292 UL 2000 11 MOOG, INC. $111,608,841 293 MOG.A 3728 11 ALON USA L.P. $111,102,800 296 ALJ 2911 11 COCA - COLA ENTERPRISES...audits and investigations. As a national leader in the fight against procurement fraud, Miller participates in the U.S. Attorney General’s Financial Fraud...Excessive Profits of Defense Contractors: Evidence and Determinants1 Chong Wang—Wang is an assistant professor of financial management in the

  18. An Empirical Assessment of Defense Contractor Risk 1976-1984.

    Science.gov (United States)

    1986-06-01

    X - 7 a 2 n2m E X -) i=l m m Also under the assumptions of the CAPM , the relationship between an individual security’s expected rate of return and...Line 10𔃾 Thus, the CAPM , framed within certain simplifying assumptions , implies a linear relationship between return on investment in a company’s stock...Model ( CAPM ) is tested with regard to the same three sample groups of contractors. The third method is mean-variance analysis of both total and

  19. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  20. Proceedings wind energy R and D contractor meeting

    International Nuclear Information System (INIS)

    Caratti, G.

    1991-01-01

    This books contains a collection of progress reports from the participating contractors in the wind energy R and D sub-programme within the JOULE (Joint Opportunities for Unconventional or Long term Energy supply) programme on non-nuclear energy and rational use of energy. The current wind energy programme consists of 25 multi-partner projects which are closely interrelated and cover a broad spectrum of topics. These are grouped within the following research areas: A: Wind measuring and modelling; B: Wind turbine experiments and utilisation; C: Development of components and models; D: Stand-Alone and offshore; E: Large-wind turbines

  1. Return to work: Police personnel and PTSD

    NARCIS (Netherlands)

    Plat, Marie-Christine J.; Westerveld, Gre J.; Hutter, Renée C.; Olff, Miranda; Frings-Dresen, Monique H. W.; Sluiter, Judith K.

    2013-01-01

    This study i) describes the number of police personnel with PTSD who are working and those who are on sick leave before and after an out-patient-clinic treatment program and ii) examines which factors are related to return to work. Police personnel treated for PTSD (n=121). In this retrospective

  2. 10 CFR 26.155 - Laboratory personnel.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Laboratory personnel. 26.155 Section 26.155 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Laboratories Certified by the Department of Health and Human... ensure the continued competency of laboratory personnel by documenting their in-service training...

  3. Personnel radiation safety in nuclear power plants

    International Nuclear Information System (INIS)

    Elkert, J.

    1979-05-01

    The principal contributions to the radiation doses of the Swedish power reactor personnel are identified. The possi bilities to reduce these doses are examined. The radiation doses are analyzed according to different personnel categories, specific maintenance operations or inspections and to different radiation activities. Suggestions are given for reducing the radiation doses. (L.E.)

  4. Maintenance Personnel Performance Simulation (MAPPS) model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.; Haas, P.M.

    1984-01-01

    A stochastic computer model for simulating the actions and behavior of nuclear power plant maintenance personnel is described. The model considers personnel, environmental, and motivational variables to yield predictions of maintenance performance quality and time to perform. The mode has been fully developed and sensitivity tested. Additional evaluation of the model is now taking place

  5. 10 CFR 39.65 - Personnel monitoring.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Personnel monitoring. 39.65 Section 39.65 Energy NUCLEAR REGULATORY COMMISSION LICENSES AND RADIATION SAFETY REQUIREMENTS FOR WELL LOGGING Radiation Safety Requirements § 39.65 Personnel monitoring. (a) The licensee may not permit an individual to act as a logging...

  6. 10 CFR 34.47 - Personnel monitoring.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Personnel monitoring. 34.47 Section 34.47 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Radiation Safety Requirements § 34.47 Personnel monitoring. (a) The licensee may not...

  7. 21 CFR 211.28 - Personnel responsibilities.

    Science.gov (United States)

    2010-04-01

    ... apparel, such as head, face, hand, and arm coverings, shall be worn as necessary to protect drug products... observation) to have an apparent illness or open lesions that may adversely affect the safety or quality of... medical personnel not to jeopardize the safety or quality of drug products. All personnel shall be...

  8. Health-physics personnel: a need unfulfilled

    International Nuclear Information System (INIS)

    Kathren, R.E.

    1983-06-01

    Current trends and conditions in the health physics profession are discussed. The need for health physics personnel in academia, nuclear power plants, other nuclear industry, national laboratories, and other sectors and the shortfall in qualified personnel to fill the available positions is described. Reasons for the present situation and recommendations for alleviating it are presented

  9. Innovative activity of personnel of organization

    Directory of Open Access Journals (Sweden)

    V. N.Belkin

    2010-09-01

    Full Text Available This article deals with transition way of economic of the Russian Federation on an innovative way of development. The special attention is given the internal social and economic environment of the organizations which, as a rule, counteracts development of innovative activity of the personnel. Ways of increase of innovative activity of the personnel are offered.

  10. Recovery Audit Contractor medical necessity readiness: one health system's journey.

    Science.gov (United States)

    Scott, Judith A; Camden, Mindy

    2011-01-01

    To develop a sustainable approach to Recovery Audit Contractor medical necessity readiness that mitigates the regulatory and financial risks of the organization. Acute care hospitals. Utilizing the model for improvement and plan-do-study-act methodology, this health system designed and implemented a medical necessity case management program. We focused on 3 areas for improvement: medical necessity review accuracy, review timeliness, and physician adviser participation for secondary reviews. Over several months, we improved accuracy and timeliness of our medical necessity reviews while also generating additional inpatient revenue for the health system. We successfully enhanced regulatory compliance and reduced our financial risks associated with Recovery Audit Contractor medical necessity audits. A successful medical necessity case management program can not only enhance regulatory compliance and reduce the amount of payments recouped by Medicare, but also generate additional inpatient revenue for your organization. With health care reform and accountable care organizations on the horizon, hospitals must find ways to protect and enhance revenue in order to carry out their missions. This is one way for case managers to help in that cause, to advocate for the care of their patients, and to bring value to the organization.

  11. Global petroleum fiscal systems compared by contractor take

    International Nuclear Information System (INIS)

    Johnston, D.

    1994-01-01

    Petroleum fiscal terms in most countries are tougher than in the US, but these countries have more geological potential and still may be economically attractive. The market for exploration capital and technology is super competitive and getting more sophisticated. Governments are increasingly aware of the global market for exploration acreage or rehabilitation projects. For many oil companies, an important part of the negotiations is to secure terms acceptable to the potential partner. Knowing the market and what terms are realistic depends on a region's potential and other factors. Most countries developing petroleum fiscal systems are opting for the production sharing contract (PSC). This trend began in the 1960s. Now, nearly half of the countries with petroleum potential have a system based on the PSC. However, financial results could be the same in a royalty/tax arrangement. Economics depend primarily on division of profits or what is known as government/contractor take. The paper discusses contractor take, estimating take, Indonesian split, and take implications

  12. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    International Nuclear Information System (INIS)

    Bodie, J.S.; Haymour, J.

    1999-01-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts

  13. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-07-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  14. Implementation of 29 CFR 1910.120 at a multiple-contractor operated facility

    International Nuclear Information System (INIS)

    Vincent, O.L.

    1991-01-01

    The application of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, at a complex former Department of Energy production facility has been extremely complicated. The requirements established by this Occupational Safety and Health Administration standard are extremely complex and have required a significant expenditure of resources to implement. A discussion of both the specific requirements of the standard are provided along with some of the implementation strategies employed and difficulties encountered. Additionally, a detailed discussion of the scope of the standard is presented. The Fernald Environmental Management Project (FEMP) formally the Feed Materials Production Center, at Fernald, Ohio is a former DOE production facility which has incurred a dramatic change in mission in becoming an environmental restoration site. Accompanying this mission change was the inclusion of the site on the National Priorities List (NPL). With the initiation of environmental restoration activities, a realization of the extent of application of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, has been realized. The application of this OSHA mandated requirement at a 425 hectare facility employing over 1500 contractor and government personnel, with several hundred separate companies represented, has been extremely complicated. Compliance initially resulted in the stoppage of several projects and the delay of even more at considerable cost to the Department of Energy. This paper discusses how 29 CFR 1910.120 has been implemented at the FEMP, how the problems encountered have been solved and how continuing problems are being evaluated. The following topics are discussed separately: 1. Description and Scope of the Standard; 2. Site Program; 3. Site-Specific Safety and Health Plan; 4. Site Control; 5. Training; 6. Medical Surveillance; 7. Handling of Drums and Other Containers 8. Other Requirements

  15. 34 CFR 361.18 - Comprehensive system of personnel development.

    Science.gov (United States)

    2010-07-01

    ... implementation of a plan to address the current and projected needs for personnel who are qualified in accordance... accordance with paragraph (c) of this section, including personnel from minority backgrounds and personnel... retraining, recruiting, and hiring personnel; (B) The specific time period by which all State unit personnel...

  16. Report for fiscal 1981 on comprehensive survey for nationwide geothermal resources. Survey on radar imaging method - geothermal conception design (Associated material 3 - materials related to U.S. geothermal analysis contractors and consultants); 1981 nendo zenkoku chinetsu shigen sogo chosa hokokusho. Radar eizoho chosa (chinetsu kaiseki gainen sekkei futai shiryo 3 (Beikoku chinetsu kaiseki contractor oyobi consultant kankei shiryo))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-10-01

    This paper summarizes the U.S. geothermal analysis contractors, including the Aero Service Corporation, the EG and G Group, the QEB Group, and the Republic Geothermal, Inc., and the consultants, including the Remote Sensing Consultants. For the Aero Service Corporation, the paper states histories of and books written by major personnel. For the EG and G Group, the paper states the outlines of such companies as EG and G Services, EG and G Geometrics, Mars Associates, Inc., and UURI, as well as histories of and books written by major personnel. For the QEB Group, the paper states the outlines of such companies as QEB, Inc., and Eureka Resource Associates, Inc. as well as histories of and books written by major personnel. For the Republic Geothermal, Inc., the paper states the company outline, histories of and books written by major personnel. For the Remote Sensing Consultants, the paper states the history of and books written by Dr. R.J.P.L. Lyon. (NEDO)

  17. Occupational exposure of nuclear medicine personnel

    International Nuclear Information System (INIS)

    Roessler, M.

    1982-01-01

    The results are given of measurements of the radiation burden of personnel in departments of nuclear medicine in the years 1979 to 1981 using film dosemeters and ring thermoluminescence dosemeters evaluated by the national personnel dosemeter service. The relations are examined of the exposure of hands and the preparation of radiopharmaceuticals and especially their use for examinations. Certain organizational measures are indicated for reducina radiation burden in a laboratory for the preparation of radiopharmaceuticals. The results of measurements and evaluations of radiation burden of personnel of nuclear medicine departments are confronted with conclusions published in the literature. (author)

  18. Monitoring of overalls and personnel skin contamination

    International Nuclear Information System (INIS)

    Turkin, N.F.

    1980-01-01

    Organization of monitoring of overalls and personnel skin contamination wastes is considered. The devices used for this purpose are enumerated. In sanitary sluices through which the personnel leaving the repair zone it is recommended to particularly thoroughly control hand skin contamination and most contaminated parts of overalls (sleeves, breeches lower parts, pockets, stomack region). In sanitary check points during personnel leaving the operator zone monitoring of overalls and skin contamination is performed. The overalls and other individual protective clothing are subjected to control in a special loundry before and after washing (decontamination) [ru

  19. CHANGE OF CONTRACTOR FOR THE FACILITIES MANAGEMENT ACTIVITIES AT CERN

    CERN Document Server

    2003-01-01

    The Facilities Management contract at CERN, under the responsibility of ST Division, Group FM, is in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), cleansing, passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent control and insect control. Starting from the 1st June the present contractor will stop some activities that will be taken under its responsibility by the new one, INGEST Facility. Others activities will be moved on the 1st July. Minor perturbation in the service might occur. The contact number will not change and will be opera...

  20. CHANGE OF CONTRACTOR FOR THE FACILITIES MANAGEMENT ACTIVITIES AT CERN

    CERN Document Server

    2003-01-01

    The Facilities Management contract at CERN, under the responsibility of ST Division, Group FM, is in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), cleansing, passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent control and insect control. Starting from the 1st June the present contractor will stop some activities that will be taken under its responsibility by the new one, INGEST Facility. The remaining activities (including cleaning) will be moved on the 1st July. Minor perturbation in the service might occur. The contact number will ...

  1. The Construction Solid Waste Minimization Practices among Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Che Ahmad A.

    2014-01-01

    Full Text Available The function of minimization of construction solid waste is to reduce or eliminates the adverse impacts on the environment and to human health. Due to the increase of population that leads to rapid development, there are possibilities of construction solid waste to be increased shortly from the construction works, demolition or renovation works. Materials such as wood, concrete, paint, brick, roofing, tiles, plastic and any other materials would contribute problem involving construction solid waste. Therefore, the proper waste minimization is needed to control the quantity of construction solid waste produced. This paper identifies the type of construction solid waste produced and discusses the waste minimization practice by the contractors at construction sites in Selangor, Kuala Lumpur and Putrajaya, Malaysia.

  2. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Science.gov (United States)

    2010-10-01

    ... provide a written plan for continuing the performance of essential contractor services identified in...; and (v) The approach for communicating expectations to contractor employees regarding their roles and... or other designated representative as expeditiously as possible and use its best efforts to cooperate...

  3. Evaluation Criteria to Deliverables Crosswalk for the Tank Farm Contractor (Supercedes HNF-2020)

    International Nuclear Information System (INIS)

    WOJTASEK, R.D.

    2000-01-01

    Before the Office of River Protection can authorize proceeding with Phase 1B, the Tank Farm Contractor (TFC) must demonstrate readiness to retrieve and deliver the waste to the privatization contractor and to receive and dispose of the products and by-products returned from treatment. The TFC has organized their plans for providing these support services into the within the River Protection Project

  4. 75 FR 6669 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2010-02-10

    ...' Purchasing Systems Reviews AGENCIES: Department of Defense (DOD), General Services Administration (GSA), and... collection requirement concerning contractors' purchasing systems reviews. A request for public comments was..., Washington, DC 20405. Please cite OMB Control No. 9000-0132, Contractors' Purchasing Systems Review, in all...

  5. 75 FR 78755 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2010-12-16

    ... Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to... products requiring federal contractor certification as to the use of forced or indentured child labor. To.... 13126 (``Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor''), in...

  6. 77 FR 59418 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-09-27

    ... of products requiring federal contractor certification as to the use of forced or indentured child... DEPARTMENT OF LABOR Notice of Initial Determination Revising the List of Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to Executive Order 13126...

  7. 75 FR 42164 - Notice of Final Determination Updating the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2010-07-20

    ... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor... Guidelines for Maintenance of the List of Products Requiring Federal Contractor Certification as to Forced or.... 13126 (``Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor''), in...

  8. 76 FR 61384 - Notice of Initial Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2011-10-04

    ... Maintenance of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured... DEPARTMENT OF LABOR Notice of Initial Determination Revising the List of Products Requiring Federal Contractor Certification as to Forced/Indentured Child Labor Pursuant to Executive Order 13126...

  9. 48 CFR 2945.104 - Review and correction of contractors' property control systems.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Review and correction of... contractors' property control systems. When the Government's property administrator determines that review and... administrator must review the system to determine whether the contractor will be able to meet the requirements...

  10. 48 CFR 36.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. (a) To assure adequate interest in and supervision of all work involved... contracting officer shall insert the clause at 52.236-1, Performance of Work by the Contractor, in...

  11. 48 CFR 836.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...

  12. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... conflicts of interest. 2052.209-72 Section 2052.209-72 Federal Acquisition Regulations System NUCLEAR... Clauses 2052.209-72 Contractor organizational conflicts of interest. As prescribed at 2009.570-5(a) and..., contracts, and simplified acquisitions of the types described; 2009.570-4(b): Contractor Organizational...

  13. EDRP public local inquiry, UKAEA/BNFL precognition on: Contractor accommodation

    International Nuclear Information System (INIS)

    Scott, W.

    1986-01-01

    The availability of accommodation for contractors working on the proposed EDRP at Dounreay is discussed. It is predicted that the contractors could be accommodated without the need for special arrangement and with no adverse effect on the tourist industry. (U.K.)

  14. 48 CFR 970.2703-2 - Patent rights clause provisions for management and operating contractors.

    Science.gov (United States)

    2010-10-01

    ...-by-case basis. If the time period expired due to negligence by the contractor, DOE may grant a... to avoid such negligence in the future. If a contractor is requesting an extension of time in which... Law 101-189, section 3133(d), and the DOE owned facility is involved in weapons related research and...

  15. 48 CFR 225.7303-1 - Contractor sales to other foreign customers.

    Science.gov (United States)

    2010-10-01

    ... foreign customers. 225.7303-1 Section 225.7303-1 Federal Acquisition Regulations System DEFENSE... for Foreign Military Sales 225.7303-1 Contractor sales to other foreign customers. If the contractor has made sales of the item required for the foreign military sale to foreign customers under...

  16. Defense Organization Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

    Science.gov (United States)

    2017-02-01

    must evaluate compliance with reporting requirements frequently so they can readily identify delinquent past performance reports.24 The FAR also...problems the contractor recovered from without impact to the contract/ order. There should have been no significant weaknesses identified. A...contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool

  17. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Science.gov (United States)

    2012-06-15

    .... The essence of the definition cannot be changed substantially in the DFARS from that in the... recommended that the final rule define the contractor's obligation to cooperate, as in the mandatory... define the scope and limitations of the contractor's obligation to cooperate with Government...

  18. 78 FR 17673 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2013-03-22

    ... collection would violate the fundamental purposes of the Paperwork Reduction Act because of the burden it... subcontracting. We submit that fundamental preparation for a review is part of a contractor's normal course of... accounting of the contractors' time expenditure needed to prepare for a CPSR and respond to any contracting...

  19. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-06-11

    ... Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense.../Pension Review from Procedures, Guidance, and Information to the Defense Acquisition Regulation Supplement..., February 23, 2006, moved requirements for Contractor Insurance/Pension Review (CIPR) from DFARS 242.7302 to...

  20. 48 CFR 245.608-7 - Reimbursement of cost for transfer of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Reimbursement of cost for transfer of contractor inventory. 245.608-7 Section 245.608-7 Federal Acquisition Regulations System... Reporting, Redistribution, and Disposal of Contractor Inventory 245.608-7 Reimbursement of cost for transfer...

  1. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  2. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  3. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) [Contracting Officer shall...

  4. 29 CFR 471.16 - Under what circumstances may a contractor be reinstated?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances may a contractor be reinstated...

  5. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Science.gov (United States)

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  6. 48 CFR 1845.7101-5 - Contractor's privileged financial and business information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor's privileged financial and business information. 1845.7101-5 Section 1845.7101-5 Federal Acquisition Regulations System... 1845.7101-5 Contractor's privileged financial and business information. If a transfer of property...

  7. 48 CFR 509.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Testing performed by the... ADMINISTRATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 509.308-1 Testing performed by the contractor. In FSS solicitations and contracts that will require...

  8. 48 CFR 9.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... the contractor. (a)(1) The contracting officer shall insert the clause at 52.209-3, First Article... it is intended that the contract require (i) first article approval and (ii) that the contractor be... produce the first article and the production quantity at the same facility, the contracting officer shall...

  9. Key aspects in managing safety when working with multiple contractors: A case study

    NARCIS (Netherlands)

    Drupsteen, L.; Rasmussen, H.B.; Ustailieva, E.; Kampen, J. van

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues

  10. Task Force On Contractor Logistics in Support of Contingency Operations

    Science.gov (United States)

    2014-06-01

    task force also strongly recommends outsourcing the necessary data gathering for older contracts and moving current contracts up in the queue with a...personnel, and administration, and extend to morale, welfare , recreation, and even mortuary affairs. Other services include airfield operations...analyzed and then audited only on a high-risk basis. The task force also strongly recommends outsourcing the necessary data gathering for older contracts

  11. 42 CFR 484.4 - Personnel qualifications.

    Science.gov (United States)

    2010-10-01

    ... (CONTINUED) STANDARDS AND CERTIFICATION HOME HEALTH SERVICES General Provisions § 484.4 Personnel... baccalaureate degree in social work, psychology, sociology, or other field related to social work, and has had...

  12. WebPASS Explorer (HR Personnel Management)

    Data.gov (United States)

    US Agency for International Development — WebPass Explorer (WebPASS Framework): USAID is partnering with DoS in the implementation of their WebPass Post Personnel (PS) Module. WebPassPS does not replace...

  13. Office of Personnel Management (OPM) Earnings

    Data.gov (United States)

    Social Security Administration — Each year the Office of Personnel Management (OPM) sends SSA a file to be verified and matched against the Master Earnings File (MEF) and Employer Information File...

  14. Central Personnel Data File (CPDF) Status Data

    Data.gov (United States)

    Office of Personnel Management — Precursor to the Enterprise Human Resources Integration-Statistical Data Mart (EHRI-SDM). It contains data about the employee and their position, along with various...

  15. Guidelines for the calibration of personnel dosimeters

    International Nuclear Information System (INIS)

    Roberson, P.L.; Holbrook, K.L.

    1984-01-01

    This guide describes minimum acceptable performance levels for personnel dosimetry systems used at Department of Energy (DOE) facilities. The goal is to improve both the quality of radiological calibrations and the methods of comparing reported occupational doses between DOE facilities. Reference calibration techniques are defined. A standard for evaluation of personnel dosimetry systems and recommended design parameters for personnel dosimeters are also included. Approximate intervals for the radiation energies for which these guidelines are appropriate are 15 keV to 2 MeV for photons; above 0.3 MeV for beta particles; and 1 keV to 2 MeV for neutrons. An analysis of ANSI N13.11 was completed using performance evaluations of selected personnel dosimetry systems in use at DOE facilities. The results of this analysis are incorporated in the guidelines

  16. New ISO standard - personnel photographic film dosemeters

    International Nuclear Information System (INIS)

    Brabec, D.

    1980-01-01

    The ISO Standard 1757 ''Personnel Photographic Film Dosemeters'', issued in June 1980, is briefly described. UVVVR's own dosemeter developed for use in the national film dosimetry service in Czechoslovakia is evaluated in relation to this ISO Standard. (author)

  17. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  18. Personality, personnel selection, and job performance

    OpenAIRE

    Linden, Dimitri; Pelt, Dirk; Dunkel, Curtis; Born, Marise

    2017-01-01

    markdownabstractJob Performance: The term job performance can either refer to the objective or subjective outcomes one achieves in a specific job (e.g., the profit of a sales persons, the number of publications of a scientist, the number of successful operations of a surgeon) or to work-related activities (e.g., writing an article, conducting specific surgical acts). In the majority of research on this topic, job performance as an outcome is used. Personnel selection: Personnel selection refe...

  19. Personnel Audit Using a Forensic Mining Technique

    OpenAIRE

    Adesesan B. Adeyemo; Oluwafemi Oriola

    2010-01-01

    This paper applies forensic data mining to determine the true status of employees and thereafter provide useful evidences for proper administration of administrative rules in a Typical Nigerian Teaching Service. The conventional technique of personnel audit was studied and a new technique for personnel audit was modeled using Artificial Neural Networks and Decision Tree algorithms. Atwo-layer classifier architecture was modeled. The outcome of the experiment proved that Radial Basis Function ...

  20. Personnel monitoring of radiations with thermoluminescent dosemeters

    International Nuclear Information System (INIS)

    Miano, S.C.

    1987-01-01

    The basics of personnel dosimetry technics, used by the Radiologic Protetion and Assessorie Service (SAPRA) are presented, consisting on use of thermoluminescent and CaSO 4 :Dy monitors in aggregated pellets by Teflon. The characteristics of this dosemeters, relating to the sensitivity, energetic dependence, spike temperature, characteristic emission curve, decay and light effect are shown. The thermoluminescent dosemeter measure system and the personnel monitoring system are also described. (C.G.C.) [pt

  1. Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Adair, Kristin Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Turgeon, Jennifer [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments

    2016-04-01

    The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

  2. Radiation exposure control of nuclear power plant personnel in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Mehl, J.

    1980-01-01

    The analysis of exposure records of all persons engaged in radiation work at nuclear power plants of the Federal Republic of Germany has shown that annual collective doses increase rapidly with time. The annual gross electrical energy generated from nuclear power also increases rapidly with time, corresponding to about 11% of the total gross electrical energy produced in 1977/78. Therefore, it is obvious that there is an increase of both the risk and the benefit from nuclear power production. Whether in the course of time the situation develops more towards the risk or the benefit side is learned from the history of the annual ratio of the collective dose per gross electrical energy generated. This ratio shows a significant decrease since 1972. The decrease is due to the experience gained from operation of the first-generation plants, which led to several administrative measures aimed at an improved control of the collective doses of power plant personnel in the Federal Republic of Germany. The administrative measures include, among others, the introduction of the following requirements: (a) Everyone who applies for a nuclear power plant construction licence has to provide evidence that, in the design of the plant, full use is made of the experience gained from plants in operation with respect to reduction of collective doses of the power plant personnel. (b) Everyone who engages his employees on radiation work within operations for which an operation licence is required, but which is held by others, requires a special 'contractor licence'. (c) Every person engaged in radiation work on the basis of a contractor licence must carry a special exposure record book which is registered by the competent national authority. (author)

  3. Improving human performance in maintenance personnel

    International Nuclear Information System (INIS)

    Gonzalez Anez, Francisco; Agueero Agueero, Jorge

    2010-01-01

    The continuous evolution and improvement of safety-related processes has included the analysis, design and development of training plans for the qualification of maintenance nuclear power plant personnel. In this respect, the international references in this area recommend the establishment of systematic qualification programmes for personnel performing functions or carrying out safety related tasks. Maintenance personnel qualification processes have improved significantly, and training plans have been designed and developed based on Systematic Approach to Training methodology to each job position. These improvements have been clearly reflected in recent training programmes with new training material and training facilities focused not only on developing technical knowledge and skills but also on improving attitudes and safety culture. The objectives of maintenance training facilities such as laboratories, mock-ups real an virtual, hydraulic loops, field simulators and other training material to be used in the maintenance training centre are to cover training necessities for initial and continuous qualification. Evidently, all these improvements made in the qualification of plant personnel should be extended to include supplemental personnel (external or contracted) performing safety-related tasks. The supplemental personnel constitute a very spread group, covering the performance of multiple activities entailing different levels of responsibility. Some of these activities are performed permanently at the plant, while others are occasional or sporadic. In order to establish qualification requirements for these supplemental workers, it is recommended to establish a rigorous analysis of job positions and tasks. The objective will be to identify the qualification requirements to assure competence and safety. (authors)

  4. Occupational stress among police personnel in India

    Directory of Open Access Journals (Sweden)

    G Ragesh

    2017-06-01

    Full Text Available Background: Occupational stress and associated physical and mental health related issues are not addressed in Indian police personnel with adequate importance. Methods: Cross-sectional survey was conducted among police personnel (both male and female in Calicut urban police district, Kerala state, India. Police personnel from all designations (ranks, except from the all India services (Indian Police Service were included in the study. Data were collected using a specifically designed datasheet covering socio-demographic profile, physical and mental health related details which was prepared by researchers. Occupational stress was measured using Operational Police Stress Questionnaire (PSQ-OP and Organisational Police Stress Questionnaire (PSQ-ORG. Result: The study found that both operational and organisational stress was significant among the police officers. Organisational stress was experienced in moderate level by 68% and in high level by 14%. Operational stress scores were in the moderate range in 67% and in high range in 16.5%. The younger age group (21-35 years and lower level rank police personnel had higher stress. Stress was higher among female police personnel compared to males. While 23% of them had been diagnosed with physical illnesses, a significant four per cent of them with mental illness, and 29% of them reported substance abuse. Conclusion: The results point to the high level of stress among Indian police personnel and the need for urgent interventions from the government to address the occupational stress.

  5. Assessing the Personal Financial Problems of Junior Enlisted Personnel

    National Research Council Canada - National Science Library

    Buddin, Richard

    2002-01-01

    .... Surveys of military personnel show that, particularly for junior personnel, financial problems constitute a major source of stress, subordinate only to increased workload and family separation...

  6. A case study on the importance of quality assurance and personnel training in environmental assessment of naturally occurring radionuclides

    International Nuclear Information System (INIS)

    Wood, R.P.; Ijaz, T.; Rutz, E.

    1995-01-01

    An independent review of the remedial investigation activities at a Superfund site was performed at the request of the site owners. The site in question was being labeled as containing radioactive contamination by the state environmental protection agency based on the results of the remedial investigation sampling program, which reported above background concentrations of potassium-40 at the site. This determination would have resulted in the entire site being considered as a mixed waste hazard, with extreme consequences for the cleanup actions. The independent review of the site sampling, measurement techniques, data analysis, and report preparation discovered problems with each of these activities. These problems included failing to perform subcontractor quality assurance oversight, as well as internal quality assurance failures related to verification of critical data. Additionally, the staff at both the state environmental protection agency and the remedial contractor were poorly trained in the field of radioactive assessments and statistical data analysis. These problems delayed the site remedial actions on the most important contaminants, including xylene, arsenic, and various metals. The cost of the site remedial investigation was significantly increased, as over $300,000 were spent just on assessing and litigating the potassium-40 health hazard issue. The independent review concluded that the problems were caused by inadequate quality assurance programs compounded by a lack of proper training of the personnel performing the work. Either a good quality assurance program at the remediation contractor or use of effectively trained personnel analyzing the data would likely have avoided the problems

  7. 42 CFR 405.1012 - When CMS or its contractors may be a party to a hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may be a party to a... Hearings § 405.1012 When CMS or its contractors may be a party to a hearing. (a) CMS and/or one or more of... unrepresented beneficiary. (b) CMS and/or the contractor(s) advises the ALJ, appellant, and all other parties...

  8. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Science.gov (United States)

    2010-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child Labor... contracting officer must check the List of Products Requiring Contractor Certification as to Forced or...

  9. 48 CFR 3.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ... otherwise authorized by law or regulation. Any release containing contractor bid or proposal information or..., and marking of contractor bid or proposal information and source selection information. 3.104-4... marking of contractor bid or proposal information and source selection information. (a) Except as...

  10. Feasibility study of the correlation of lifetime health and mortality experience of AEC and AEC Contractor employees with occupational radiation exposure. Progress report No. 3, June 1, 1966-May 31, 1967

    Energy Technology Data Exchange (ETDEWEB)

    Mancuso, T.F.; Sanders, B.S.; Brodsky, A.

    1967-01-01

    The objective of this 5-year project is to assess the feasibility of using personnel, employment, medical, and radiation records in establishing the relationships between mortality patterns and levels of radiation exposure. The following AEC Contractor facilities were selected for the test runs: the three Oak Ridge facilities, Hanford, and several small feed materials plants. During this project year, the recording of personal data on Oak Ridge employees and feed materials centers will be intensified, other phases of the project will be continued, and the searching for deaths through the Social Security Administration will begin. (PCS)

  11. Health and Safety Guide for Home Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Stratton, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Walker, Iain S. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-02-15

    This report is intended to provide home performance contractor trainers with a resource to keep both their workers and home residents safe and healthy. This document is an attempt to describe what we currently believe is safe, what we believe is unsafe, and what we’re unsure about. It is intended to identify health and safety issues and provide historical context and current understanding of both risks and mitigation strategies. In addition, it provides links to more in-depth resources for each issue. When we tighten the thermal envelope of a house to improve comfort and reduce energy use, we have to be sure that we are not compromising the indoor air quality of the home. This means identifying and mitigating or eliminating pollution sources before and after you make changes to the home. These sources can include materials and finishes in the home, exhaust gasses from combustion appliances, soil gasses such as radon, and moisture from a bathroom, kitchen, or unvented clothes dryer. Our first responsibility is to do no harm — this applies both to our clients and to our employees. Currently, there are many new products that are widely used but whose health effects are not well understood. Our in ability to have perfect information means the directive to do no harm can be difficult to obey. Each home is a little bit different, and in the face of a situation you’ve never encountered, it’s important to have a solid grasp of the fundamental concepts of building science when the hard and fast rules don’t apply . The home performance industry is gaining momentum, and has the potential to expand greatly as energy costs continue to rise. It is imperative that we remain vigilant about protecting the health and safety of our workers and our customers. It only takes a few news stories about a family that got sick after their home was tightened by a home performance contractor to scare off potential customers and taint the reputation of the entire industry. Good

  12. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  13. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  14. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1994-11-01

    The purpose of this plan is to establish the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program and outline the activities and schedules that will be employed to reduce the quantity and toxicity of wastes generated as a result of restoration and remediation activities. It is intended to satisfy the US Department of Energy (DOE) and other legal requirements. As such, the Pollution Prevention Awareness program required by DOE Order 5400.1 is included with the Pollution Prevention Program. This plan is also intended to aid projects in meeting and documenting compliance with the various requirements for WMin/P2, and contains the policy, objectives, strategy, and support activities of the WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Various pollution prevention techniques will be implemented with the support of employee training and awareness programs to reduce waste and still meet applicable requirements. Information about the Hanford Site is in the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan

  15. Contractor Work Preparation Process Improvement Using Lean Six Sigma

    Directory of Open Access Journals (Sweden)

    Asana Kusnadi

    2016-06-01

    Full Text Available To ensure the health and safety of their workforce and protection of their assets and the environment, a global oil and gas company operating in Indonesia requires comprehensive identification and evaluation of job hazards that were included in work permitting process prior work execution in the field. Based on 20 data points obtained in August 2013, start-working time for contractors who worked for Capital Project Management (CPM Team in Facility B was in average at 09.05 a.m. The aim of this paper is to present how the firm implemented Lean Six Sigma to reduce non-added value activities while fulfilling to its safety requirements and to share lessons learned from practical and theory testing perspective. The methodology used is Lean Six Sigma’s DMAIC (Define, Measure, Analyze, Improve, Control as mandated by the corporate policy of the firm. This research adopts a mix-methods approach, by using both qualitative and quantitative data. This study was a one year longitudinal study of the Lean Six Sigma implementation to improve contractors’ work preparation process. The improvement resulted in reduction of non-value added activities and successfully increased the available working time per day by 59.3 minutes in average. The results of this case study reconfirm Lean Six Sigma as a good management theory since it shows a consistency between the theory and the real practice in a global oil and gas company in Indonesia.

  16. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  17. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  18. United States extension of indemnification to utilities and contractors

    International Nuclear Information System (INIS)

    Cunningham, G.H.

    1988-01-01

    The status of legislation in the United States, usually known as the Price-Anderson Act, provides an assured source and means of compensation for members of the public who may be injured as a result of a nuclear accident at a licensed commercial nuclear power plant or at a facility of the United States Government operated by a contractor. First a brief overview of the Act and its history is given, then the course of legislation to extend the Price-Anderson Act through the United States Congress is charted with comments made on the major issues of the debate. The Act requires that a least $560 million in insurance and/or Government indemnity is available to cover public liability claims arising out of an accident at a nuclear power plant. The Act also limits the total liability of all persons for any nuclear incident to a predetermined amount and this is one issue discussed. Final action on the legal situation should be taken in 1988. (U.K.)

  19. Privatisation of Security: Private Military Contractors Serving Governments

    Directory of Open Access Journals (Sweden)

    Jarosław Piątek

    2017-12-01

    Full Text Available Privatisation of security did not appear in the process of revolution. Under conditions of deepening international relations, as well as integration and globalisation processes, security of the state, as well as other entities, is subject to a number of dependencies. The article casts some doubt on how much states are prepared to take such actions, while not losing the attribute of monopoly on violence. Moreover, the article presents doubts about the ranks of modern armed forces. Private Military Firms (PMFs are new actors the actions of which affect the security. The contemporary image of the PMF functioning is a phenomenon on a global scale. In the twenty-first century, small businesses can have a huge impact on the reality and international affairs. Leaving military firms without state control proves that they do not understand the dynamics, range, risks and challenges posed by cooperation with entities that are allowed to use force. Furthermore, despite devastating consequences that occurred during the state stabilisation operations, these firms continued to outsource services to contractors, while not creating any legal control over them.

  20. Radiation exposures for DOE and DOE contractor employees, 1990

    International Nuclear Information System (INIS)

    Smith, M.H.; Hui, T.E.; Millet, W.H.; Scholes, V.A.

    1994-03-01

    This is the 23rd in a series of annual radiation exposure reports published by the Department of Energy (DOE) or its predecessors. This report summarizes the radiation exposures received by both employees and visitors at DOE and DOE contractor facilities during 1990. Trends in radiation exposures are evaluated by comparing the doses received in 1990 to those received in previous years. The significance of the doses is addressed by comparing them to the DOE limits and by correlating the doses to health risks based on risk estimated from expert groups. This report is the third that is based on detailed exposure data for each individual monitored at a DOE facility. Prior to 1988, only summarized data from each facility were available. This report contains information on different types of radiation doses, including total effective, internal, penetrating, shallow, neutron, and extremity doses. It also contains analysis of exposures by age, sex, and occupation of the exposed individuals. This report also continues the precedent established in the Twenty-First (1988) Annual Report by conducting a detailed, one-time review and analysis of a particular topic of interest. The special topic for this report is a comparison of total effective, internal, and extremity dose equivalent values against penetrating dose equivalent values

  1. Nuclear criticality safety training: guidelines for DOE contractors

    International Nuclear Information System (INIS)

    Crowell, M.R.

    1983-09-01

    The DOE Order 5480.1A, Chapter V, Safety of Nuclear Facilities, establishes safety procedures and requirements for DOE nuclear facilities. This guide has been developed as an aid to implementing the Chapter V requirements pertaining to nuclear criticality safety training. The guide outlines relevant conceptual knowledge and demonstrated good practices in job performance. It addresses training program operations requirements in the areas of employee evaluations, employee training records, training program evaluations, and training program records. It also suggests appropriate feedback mechanisms for criticality safety training program improvement. The emphasis is on academic rather than hands-on training. This allows a decoupling of these guidelines from specific facilities. It would be unrealistic to dictate a universal program of training because of the wide variation of operations, levels of experience, and work environments among DOE contractors and facilities. Hence, these guidelines do not address the actual implementation of a nuclear criticality safety training program, but rather they outline the general characteristics that should be included

  2. 32 CFR 720.20 - Service of process upon personnel.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Service of process upon personnel. 720.20... DELIVERY OF PERSONNEL; SERVICE OF PROCESS AND SUBPOENAS; PRODUCTION OF OFFICIAL RECORDS Service of Process and Subpoenas Upon Personnel § 720.20 Service of process upon personnel. (a) General. Commanding...

  3. Nuclear power plant personnel training and its evaluation. A guidebook

    International Nuclear Information System (INIS)

    1996-01-01

    The Guidebook will prove especially useful for, and is addressed primarily to: nuclear power operating organizations establishing or upgrading their NPP personnel training systems; regulatory personnel responsible for setting requirements and/or evaluating NPP personnel training; and organizations (within or outside the operating organization) responsible for the development, implementation and evaluation of training programmes for NPP personnel. Figs, tabs

  4. A swedish dose passport - contractors point of view

    International Nuclear Information System (INIS)

    Andersson, M.; Holmqvist, A.; Moller, J.

    2003-01-01

    Westinghouse Atom is situated in Vasteras approximately 100 km west from Stockholm. The company is owned by BNFL. The two largest divisions are the Nuclear Fuel Operations and The Global Reactor Services division. The Nuclear fuel operations manufacture fuel for BWR and PWR reactors. The raw material used is Uranium hexafluoride, which is converted to Uranium dioxide powder through wet AUC-process. The concession is 600 tonnes of UO 2 , per year. Last year the production. was approximately 900 fuel elements. There is also a control rod production line within the fuel factory. Last year the production of control rods was approximately 160. The Global Reactor Services Division performs tests on different types of equipments used in nuclear power plants. In addition there is also a well-established service structure that provides a wide range of field services, for instance sipping of fuel elements. The total amount of people working in Vasteras is currently around 800. The majority of those, work at the fuel factory. The purpose of this paper is to describe the somewhat awkward situation for our employees when working as external personnel on German nuclear installations. Our Swedish personnel are currently using German dose passports. Since Sweden joined the European Union in 1995 this is in contradiction to the EU-directives. Hence, Westinghouse Atom has applied for a license for the use of Swedish dose passports in Germany. The amount of people performing service jobs in Germany is approximately 80 persons. (authors)

  5. Systematic approach to personnel neutron monitoring

    International Nuclear Information System (INIS)

    Griffith, R.V.; Hankins, D.E.

    1980-01-01

    NTA film and albedo detectors represent the major portion of personnel dosimeters now used for occupational neutron monitoring. However, recent attention to the spectral response of these systems has demonstrated the need for detectors that have a better match to the fields being monitored. Recent developments in direct recoil track etch dosimeters present some intriguing alternatives, and careful use of 237 Np fission fragment detectors offers the advantage of a good dose equivalent spectral match. Work continues on a number of other new detector mechanisms, but problems with sensitivity, energy response, gamma interference, etc., continue to prevent development of most mechanisms into viable personnel dosimeters. Current dosimeter limitations make a systematic approach to personnel neutron monitoring particularly important. Techniques have been developed and tested, using available portable survey instruments, that significantly improve the quality of dosimeter interpretation. Even simple spectrometry can be done with modest effort, significantly improving the health physicists ability to provide accurate neutron monitoring

  6. Principles for enhancing professionalism of nuclear personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-03-01

    The management principles in this publication were developed by a committee of senior utility officials with assistance by the staff of the Institute of Nuclear Power Operations (INPO) and with input from virtually all U.S. nuclear utilities. The principles are aimed at creating an environment within a nuclear power plant that promotes a healthy respect for the unique technology that nuclear electric power represents and, thus, to promote great care and conservative, thoughtful decision-making by the nuclear plant staff. The scope of the principles includes all nuclear personnel and gives guidance in the selection and development of management and supervisory personnel and other key individuals in the areas of operations, maintenance, technical support and engineering. Utility managers are encouraged to make in-depth comparisons between these principles and their day-to-day policies and practices, and to use such efforts as opportunities to communicate their organization's management philosophy to all nuclear personnel.

  7. Health physics personnel: a need unfulfilled

    International Nuclear Information System (INIS)

    Kathren, R.L.

    1983-01-01

    For the past decade, the demand for health physics personnel, at both the professional and technical levels, has been increasing, and indeed has become quite acute in recent years. The need for health physics personnel is demonstrated by a summary of projected requirements and potential candidates by the year 1991. Suggestions made for ensuring the availability of qualified health physics personnel includes: 1) a characterization study of health physicists should be conducted, with emphasis on industry, to determine qualifications, job satisfaction factors, and other data pertinent to entry and retention in the field; 2) the curricula currently offered by post-secondary schools should be evaluated for quality and relevance; and 3) an industry standard or protocol for qualification and training of health physics should be developed and implemented

  8. Severe accident testing of a personnel airlock

    International Nuclear Information System (INIS)

    Clauss, D.B.; Parks, M.B.; Julien, J.T.; Peters, S.W.

    1988-01-01

    Sandia National Laboratories (Sandia) is investigating the leakage potential of mechanical penetrations as part of a research program on containment integrity under severe accident loads for the U.S. Nuclear Regulatory Commission (NRC). Barnes et al. (1984) and Shackelford et al. (1985) identified leakage from personnel airlocks as an important failure mode of containments subject to severe accident loads. However, these studies were based on relatively simple analysis methods. The complex structural interaction between the door, gasket, and bulkhead in personnel airlocks makes analytical evaluation of leakage difficult. In order to provide data to validate methods for evaluating the leakage potential, a full-size personnel airlock was subject to simulated severe accident loads consisting of pressure and temperature up to 300 psig and 800 degrees F. The test was conducted at Chicago Bridge and Iron under contract to Sandia. The authors provide a detailed report on the test program

  9. Education and training for security personnel

    International Nuclear Information System (INIS)

    Chida, Toshiya

    2015-01-01

    It is said that Physical Protection (PP) has two purposes. One is to prevent from occurring risks of threat and terrorism and the other is to minimize damages which will be happened in case of unusual conditions or emergency situation. To achieve this goal, personnel who perform their duties should have professional knowledge and skills concerning security. However, since newcomers rarely satisfy their knowledge and skill for nuclear security in most cases. Therefore, we have to provide adequate education and training after they joined to our company. To this end, our company, located in Aomori Prefecture focused on security and physical protection for nuclear related facilities. In this paper, personnel training and challenges in order to bring up security personnel at our company will be introduced. (author)

  10. Principles for enhancing professionalism of nuclear personnel

    International Nuclear Information System (INIS)

    1989-01-01

    The management principles in this publication were developed by a committee of senior utility officials with assistance by the staff of the Institute of Nuclear Power Operations (INPO) and with input from virtually all U.S. nuclear utilities. The principles are aimed at creating an environment within a nuclear power plant that promotes a healthy respect for the unique technology that nuclear electric power represents and, thus, to promote great care and conservative, thoughtful decision-making by the nuclear plant staff. The scope of the principles includes all nuclear personnel and gives guidance in the selection and development of management and supervisory personnel and other key individuals in the areas of operations, maintenance, technical support and engineering. Utility managers are encouraged to make in-depth comparisons between these principles and their day-to-day policies and practices, and to use such efforts as opportunities to communicate their organization's management philosophy to all nuclear personnel

  11. From personnel dose to personal dose

    International Nuclear Information System (INIS)

    Hoefert, M.; Raffnsoe, R.C.; Tuyn, J.W.N.; Wittekind, D.

    1985-01-01

    From following the development of personnel doses at CERN over the past six years it has become evident that work in areas of induced radioactivity is the principal cause of exposure. The results of photon dose measurements free-in-air and around a phantom are presented and discussed in the light of new quantities in individual monitoring. The importance of these results, with respect to the practical situation, is discussed and the problem of phantom size is mentioned. Finally, the results of dose measurements in the phantom are presented, since such information is important in cases where it becomes necessary to transform personnel doses into personal doses. (author)

  12. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  13. The training of the operation personnel

    International Nuclear Information System (INIS)

    Martin, H.D.

    1975-01-01

    A survey about training places and the volume of the training program for reactor personnel in the Federal Republic of Germany is given. Paragraph 7 of the atomic energy act, which imposes on the operators of nuclear energy plants the qualifired training of the personnel, is refered to. Positive experiences with the use of simulation equipment for training have led to the planning of a simulator-centre which is expected to be ready for operation in 1977. The versatile program of this centre is briefly reported. (ORU) [de

  14. Automating the personnel dosimeter monitoring program

    International Nuclear Information System (INIS)

    Compston, M.W.

    1982-12-01

    The personnel dosimetry monitoring program at the Portsmouth uranium enrichment facility has been improved by using thermoluminescent dosimetry to monitor for ionizing radiation exposure, and by automating most of the operations and all of the associated information handling. A thermoluminescent dosimeter (TLD) card, worn by personnel inside security badges, stores the energy of ionizing radiation. The dosimeters are changed-out periodically and are loaded 150 cards at a time into an automated reader-processor. The resulting data is recorded and filed into a useful form by computer programming developed for this purpose

  15. Performance estimates for personnel access control systems

    International Nuclear Information System (INIS)

    Bradley, R.G.

    1980-10-01

    Current performance estimates for personnel access control systems use estimates of Type I and Type II verification errors. A system performance equation which addresses normal operation, the insider, and outside adversary attack is developed. Examination of this equation reveals the inadequacy of classical Type I and II error evaluations which require detailed knowledge of the adversary threat scenario for each specific installation. Consequently, new performance measures which are consistent with the performance equation and independent of the threat are developed as an aid in selecting personnel access control systems

  16. PAMTRAK: A personnel and material tracking system

    International Nuclear Information System (INIS)

    Anspach, D.A.; Anspach, J.P.; Crain, B. Jr.

    1996-01-01

    There is a need for an automated system for protecting and monitoring sensitive or classified parts and material. Sandia has developed a real-time personnel and material tracking system (PAMTRAK) that has been installed at selected DOE facilities. It safeguards sensitive parts and material by tracking tags worn by personnel and by monitoring sensors attached to the parts or material. It includes remote control and alarm display capabilities and a complementary program in Keyhole to display measured material attributes remotely. This paper describes the design goals, the system components, current installations, and the benefits a site can expect when using PAMTRAK

  17. Programmatic Baseline Summary for Phase 1 Privatization for the Tank Farm contractor

    Energy Technology Data Exchange (ETDEWEB)

    DIEDIKER, J.A.

    2000-04-22

    The document describes the systematic integrated baseline planning process and provides a summary of the Tank Farm Contractor scope, schedule and cost analysis developed in support of the Phase 1 privatization mission.

  18. 48 CFR 45.402 - Title to contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... the contract. Under fixed-price type contracts, in the absence of financing provisions or other... item. If a deliverable item is to be retained by the contractor for use after inspection and acceptance...

  19. Requirements for the project management in the client / engineering contractor relationship

    International Nuclear Information System (INIS)

    Hack, W.L.

    1995-01-01

    Investment projects impose a multitude of requirements upon clients and engineering contractors to cope with the management of project inherent conflicts. The paper reviews certain aspects on why such conflicts develop, and how they may be resolved. (orig.)

  20. Programmatic Baseline Summary for Phase 1 Privatization for the Tank Farm contractor

    International Nuclear Information System (INIS)

    DIEDIKER, J.A.

    2000-01-01

    The document describes the systematic integrated baseline planning process and provides a summary of the Tank Farm Contractor scope, schedule and cost analysis developed in support of the Phase 1 privatization mission