WorldWideScience

Sample records for construction period reduction

  1. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    You, Y. M. [PHILOSOPHIA, Inc., Seoul (Korea, Republic of); Suh, K. Y. [Seoul National Univ., Seoul (Korea, Republic of)

    2009-10-15

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4{sup +}D) Technology{sup TM} resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4{sup +}D Technology{sup TM} in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4{sup +}D Technology{sup TM} anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4{sup +}D Technology{sup TM} lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space.

  2. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    You, Y. M.; Suh, K. Y.

    2009-01-01

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4 + D) Technology TM resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4 + D Technology TM in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4 + D Technology TM anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4 + D Technology TM lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space

  3. Reduction of construction periods of PWRs by optimization of detailed sequence planning

    International Nuclear Information System (INIS)

    Stocker, W.; Leverenz, R.

    1991-01-01

    The construction of PWR's is an enterprise with high investment costs, in total up to three billion US$ and with long construction periods of five years and more. Besides the results reached by the intensive standardization, a further reduction of the construction period is possible by optimization of detailed sequence planning and interfaces of work units. During the execution of the three German Convoy plants ISAR 2, EMSLAND and NECKARWESTHEIM 2, the contractual construction periods were shortened between 4 and 8 months. These reductions were reached after individual investigations by measures like advanced finishing work activities; erection of an increased amount of prefabricated pipings; rearrangement of erection sequences; overlapping of piping erection and electrical installation; reduction of plant commissioning period. All these measures support directly the reduction of the total investment cost of a plant, as already demonstrated by the Convoy plants. (author). 8 figs

  4. Methods for reduction of the period for construction and commissioning of NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2004-01-01

    The process of construction of NPP unit is associated with significant amount of engineering, civil construction works, equipment installation and testing works. In order to achieve better economical results from the point of view of the investor, it will be a benefit if the time period for construction and commissioning of the unit is reduced. In order to realize such reduction of the needed time it is possible to utilize some new approaches for installation of heavy equipment, utilization of prefabricated in advance composite modules of equipment and application of new types of construction equipment and techniques. In such way the commissioning period can be reduced, and high quality of the installation works can be achieved. (author)

  5. A study on the competitiveness improvement of the OPR1000 through reduction of the construction period

    International Nuclear Information System (INIS)

    Lee, Deuck Soo

    2009-02-01

    Current world's nuclear power plant markets change will provide variety opportunities to the Korean nuclear power plant industries. The economic competitiveness is the most significant issue to utilize the forthcoming 'Renaissance of Nuclear Power' as a chance of exporting OPR1000. To improve the competitiveness of the OPR1000, the capital cost which is the key factor of the generating cost of the nuclear power plant should be reduced. Reduction of the construction period is more important than the design improvement or facility change regarding capital cost perspectives. The aim of this study, therefore, is to introduce the parallel installation method for reducing the construction period to achieve the economic competitiveness. The parallel installation path was selected among critical paths by analyzing the construction schedules of the nuclear power plants built in Korea. Reactor Coolant Loop Installation and Reactor Vessel Internal Installation were selected for the parallel installation method in this study. Conventional installation method installs reactor vessel internal after finishing reactor coolant loop installation. Therefore it needs about twenty (20) months from the reactor vessel settings to the completion of the reactor vessel internal installation. The parallel installation methodology proposed in this study can reduce the construction period about two (2) months by installing reactor vessel internals in parallel with the welding process of the cross-over leg between the steam generator and the reactor coolant pump. ANSYS Codes was utilized to show the deformation impacts on the reactor vessel caused by the shrinkage force imposed by the welding process of the cross-over leg. The code analysis results lead the deformation impact is negligible. And it confirms the parallel installation of the reactor vessel internal with the cross-over leg can be applied for the OPR1000 construction. The economic improvement by the parallel installation was also

  6. Reduction of construction period by development and applying of advanced turbine generator foundation as composite structure

    International Nuclear Information System (INIS)

    Sekimoto, Hisashi; Fuyama, Hiroyuki; Kameda, Ichiro; Fukunaga, Yuuji; Umetada, Isao; Magoshi, Ryutaro

    1999-01-01

    Mitsubishi Heavy Industries developed a composite steel-concrete beam for constructing elevated horizontal beams for turbine-generator foundations. This system was used at the company's Verification Test Plant at the Takasago Machinery Works. Composite steel-concrete beams are made from U-shaped steel casings that acts as a temporarily formwork and are permanently used as major concrete beam reinforcement. Prefabricated U-shaped steel casings must be placed on top of vertical concrete columns. After steel casings are positioned and secured, concrete is filled. This technique cuts one month from construction time and simplifies required temporary work such as falsework and formwork. This paper details the results of practical research on design and construction as they relate to required strength and vibration. (author)

  7. 47 CFR 22.1035 - Construction period.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Construction period. 22.1035 Section 22.1035 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1035 Construction period. The construction period (see § 22.142) for...

  8. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  9. Sustainable construction : towards a strategic approach to construction material management for waste reduction

    OpenAIRE

    Abarca Guerrero, L.; Scheublin, F.J.M.; Egmond - de Wilde De Ligny, van, E.L.C.; Lambert, A.J.D.

    2008-01-01

    The construction sector plays a key role in shaping and developing the built environment. It also has an undisputed and significant impact on it due to the amounts of materials extracted and produced as waste. The construction industry has emphasized to recycling construction waste (CW), however, relatively less emphasis has been paid on construction waste minimization. CW reduction can be achieved through changes in design concepts, material and construction methods selection and material ma...

  10. 47 CFR 73.3598 - Period of construction.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Period of construction. 73.3598 Section 73.3598 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES... size standards for its industry grouping, as set forth in 13 CFR 121 through 201, at the time the...

  11. Technique for Reduction of Environmental Pollution from Construction Wastes

    Science.gov (United States)

    Bakaeva, N. V.; Klimenko, M. Y.

    2017-11-01

    The results of the research on the negative impact construction wastes have on the urban environment and construction ecological safety are described. The research results are based on the statistical data and indicators calculated with the use of environmental pollution assessment in the restoration system of urban buildings technical conditions. The technique for the reduction of environmental pollution from construction wastes is scientifically based on the analytic summary of scientific and practical results for ecological safety ensuring at major overhaul and current repairs (reconstruction) of the buildings and structures. It is also based on the practical application of the probability theory method, system analysis and disperse system theory. It is necessary to execute some stages implementing the developed technique to reduce environmental pollution from construction wastes. The stages include various steps starting from information collection to the system formation with optimum performance characteristics which are more resource saving and energy efficient for the accumulation of construction wastes from urban construction units. The following tasks are solved under certain studies: basic data collection about construction wastes accumulation; definition and comparison of technological combinations at each system functional stage intended for the reduction of construction wastes discharge into the environment; assessment criteria calculation of resource saving and energy efficiency; optimum working parameters of each implementation stage are created. The urban construction technique implementation shows that the resource saving criteria are from 55.22% to 88.84%; potential of construction wastes recycling is 450 million tons of construction damaged elements (parts).

  12. Architects' perspectives on construction waste reduction by design.

    Science.gov (United States)

    Osmani, M; Glass, J; Price, A D F

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

  13. Architects' perspectives on construction waste reduction by design

    International Nuclear Information System (INIS)

    Osmani, M.; Glass, J.; Price, A.D.F.

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process

  14. Constructing a holistic approach to disaster risk reduction: the significance of focusing on vulnerability reduction.

    Science.gov (United States)

    Palliyaguru, Roshani; Amaratunga, Dilanthi; Baldry, David

    2014-01-01

    As a result of the increase in natural disaster losses, policy-makers, practitioners, and members of the research community around the world are seeking effective and efficient means of overcoming or minimising them. Although various theoretical constructs are beneficial to understanding the disaster phenomenon and the means of minimising losses, the disaster risk management process becomes less effective if theory and practice are set apart from one another. Consequently, this paper seeks to establish a relationship between two theoretical constructs, 'disaster risk reduction (DRR)' and 'vulnerability reduction', and to develop a holistic approach to DRR with particular reference to improving its applicability in practical settings. It is based on a literature review and on an overall understanding gained through two case studies of post-disaster infrastructure reconstruction projects in Sri Lanka and three expert interviews in Sri Lanka and the United Kingdom. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.

  15. Analysis on optimization of the critical path for civil construction period of Fangjiashan nuclear island constructed under EPC mode

    International Nuclear Information System (INIS)

    Liu Yongqing; Wu Youcong; Qiu Jinhong

    2011-01-01

    Based on the actual situation of nuclear island civil construction in Fangjiashan nuclear power plant and combined with the arrangement of the construction schedule, the analysis on optimization of the critical path for civil construction period is conducted. The result shows that on the premise of not increasing the contract price and the total engineering cost based on the original 57-month construction period, the construction period can be shorten to 21 month through strengthening the schedule control, keeping the critical work in a reasonable duration and rearranging the link between programmers. In addition, in view of the economic analysis, if we increase the mechanical engagement and adopt special method, the 2-month construction period can be even shortened to 20 months. (authors)

  16. LULA VS ALCKMIN: DISCURSIVE CONSTRUCTIONS OF THE VEJA PERIODIC

    Directory of Open Access Journals (Sweden)

    Cicília de Sousa Frazão

    2009-08-01

    Full Text Available This work is carried out an analysis of the cover of the 1980 edition of the magazine Veja, published on November 01, 2006, in the election campaign of 2006 – second round, focusing on the image of President Luiz Inácio Lula da Silva and Geraldo Alckmin. Try to understand the imagetic and verbal speech expressed in covers and its constraints on social and discursive formation, through the investigations of the mechanisms of construction of the iconic and verbal text and reveal the effects of meaning constructed in covers. Based on a theoretical support, to seek to understand of how the effect depends on the codes produced by a culture and how they are mobilized by the media to construct or deconstruct a politician´s image facing society

  17. Defect reduction in different periods of a fab's life

    Science.gov (United States)

    Kallis, Norbert

    1997-08-01

    The reduction of yield loss caused by particles is a key topic of productivity enhancement. It deals with many components of a fab's structure: (1) Cultural mindset of managers, engineers, and operators -- to have champions for that mission, (2) selection of defect metrology tools -- with high throughput and reliable data, (3) single equipment characterization -- to set challenging specs according to the best performing tool, (4) inline reaction procedures -- to transfer knowledge and responsibility to the operators, (5) statistical evaluation of large datasets -- including correlation to electrical yield, (6) and to trace back the way to the single tools or the low performing processes. This paper discusses some topics to be considered during process and equipment planning, ramp up, and mature production. It has been proven to be successful during a very aggressive ramp up in wafer starts and an even more convincing yield increase of a fab, that now started the production of DRAM's in quarter micron technology. It will conclude in an understanding, that besides a reliable statistical methodology the human performance is the key: can we really integrate people of different groups and levels of responsibility and motivate them to take joint actions for yield goals?

  18. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  19. Development of advanced concept for shortening construction period of ABWR plant (part 2)

    International Nuclear Information System (INIS)

    Fujita, Tomohiro; Satoh, Takashi

    2003-01-01

    The construction of the first building fully applying SC structure, which is indispensable for shortening construction period of ABWR plants (21.5 months from the first concrete work to fuel loading), has been started since August 2002 in Japan. Before the construction start, a pre-construction test with some actual size SC panels was carried out to confirm the SC modular construction method. The outline of the design and the construction of the first full-SC building and the results of the pre-construction test are reported. (author)

  20. Development of Advanced Concept for Shortening Construction Period of ABWR Plant

    International Nuclear Information System (INIS)

    Hiroshi Ijichi; Toshio Yamashita; Masahiro Tsutagawa; Hiroya Mori; Nobuaki Ooshima; Jun Miura; Minoru Kanechika; Nobuaki Miura

    2002-01-01

    Construction of a nuclear power plant (NPP) requires a very long period because of large amount of construction materials and many issues for negotiation among multiple sections. Shortening the construction period advances the date of return on an investment, and can also result in reduced construction cost. Therefore, the study of this subject has a very high priority for utilities. We achieved a construction period of 37 months from the first concrete work to fuel loading (F/L) (51.5 months from the inspection of the foundation (I/F) to the start of commercial operation (C/O)) at the Kashiwazaki-Kariwa NPPs No. 6 and 7 (KK-6/7), which are the first ABWR plants in the world. At TEPCO's next plant, we think that a construction period of less than 36 months (45 months from I/F to C/O) can be realized based on conventional methods such as early start of equipment installation and blocking of equipment to be brought in advance. Furthermore, we are studying the feasibility of a 21.5-month construction period (30 months from I/F to C/O) with advanced ideas and methods. The important concepts for a 21.5-month construction period are adoption of a new building structure that is the steel plate reinforced concrete (SC) structure and promotion of extensive modularization of equipment and building structure. With introducing these new concepts, we are planning the master schedule (M/S) and finding solutions to conflicts in the schedule of area release from building construction work to equipment installation work (schedule-conflicts.) In this report, we present the shortest construction period and an effective method to put it into practice for the conventional general arrangement (GA) of ABWR. In the future, we will continue the study on the improvement of building configuration and arrangements, and make clear of the concept for large composite modules of building structures and equipment. (authors)

  1. Construction of N=8 supergravity theories by dimensional reduction

    International Nuclear Information System (INIS)

    Boucher, W.

    1985-01-01

    In this paper I ask which N=8 supergravity theories in four dimensions can be obtained by dimensional reduction of the N=1 supergravity theory in eleven dimensions. Several years ago Scherk and Schwarz produced a particular class of N = 8 theories by giving a dimensional reduction scheme on the restricted class of coset spaces, G/H, with dim H=0 (and therefore dim G=7). I generalize their considerations by looking at arbitrary (seven-dimensional) coset spaces. Also, instead of giving a particular ansatz which happens to work, I set about the distinctly more difficult task of determining all ansatzes which produce N=8 theories. The basic ingredient of my dimensional reduction scheme is the demand that certain symmetries, including supersymmetry, be truncated consistently. I find the surprising result that the only N=8 theories obtainable within the contexts of my scheme are those theories already written down by Scherk and Schwarz. In particular dim H=0 and dim G=7. Independently of these considerations, I prove that any dimensional reduction scheme which consistently truncates supersymmetry must also be consistent with the equations of motion. I discuss Lorentz-invariant solutions of the theories of Scherk and Schwarz, pointing out that since the ansatz of Scherk and Schwarz consistently truncates supersymmetry, any solution of these theories is also a solution of the N=1 supergravity theory in eleven dimensions and, hence, in particular that there is a Freund-Rubin-type ansatz for these theories. However I demonstrate that for most gauge groups the ansatz must be trivial which implies that for these theories the cosmological constant of any Lorentz-invariant solution must be zero (classically). Finally, I make some comparisons with work by Manton on dimensional reduction. (orig.)

  2. Sustainable construction : towards a strategic approach to construction material management for waste reduction

    NARCIS (Netherlands)

    Abarca Guerrero, L.; Scheublin, F.J.M.; Egmond - de Wilde De Ligny, van E.L.C.; Lambert, A.J.D.

    2008-01-01

    The construction sector plays a key role in shaping and developing the built environment. It also has an undisputed and significant impact on it due to the amounts of materials extracted and produced as waste. The construction industry has emphasized to recycling construction waste (CW), however,

  3. A system dynamics-based environmental performance simulation of construction waste reduction management in China.

    Science.gov (United States)

    Ding, Zhikun; Yi, Guizhen; Tam, Vivian W Y; Huang, Tengyue

    2016-05-01

    A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping should be emphasized. Copyright © 2016 Elsevier Ltd. All rights reserved.

  4. REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Mladen Zelenika

    1998-12-01

    Full Text Available A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in order to justify the investment cost for the acquisition of additional equipment for a single well only. The wells, located in a karst vrtača close to an estavelle near Tomislavgrad, with a diameter of 500 mm and approximately 80 m deep, have been accomplished with a low rate of penetration using the conventional Cable tool and resp. Rotary Drilling Method. In this paper results of analyses for the given circumstances are shown: both the efficiency and cost of the mentioned drilling methods performed by the crews of »Geotehnika d.d.« Zagreb, as well as the justifiability of investments in new equipment are evaluated.

  5. Constructing carbon offsets: The obstacles to quantifying emission reductions

    International Nuclear Information System (INIS)

    Millard-Ball, Adam; Ortolano, Leonard

    2010-01-01

    The existing literature generally ascribes the virtual absence of the transport sector from the Clean Development Mechanism (CDM) to the inherent complexity of quantifying emission reductions from mobile sources. We use archival analysis and interviews with CDM decision-makers and experts to identify two additional groups of explanations. First, we show the significance of aspects of the CDM's historical evolution, such as the order in which methodologies were considered and the assignment of expert desk reviewers. Second, we highlight inconsistencies in the treatment of uncertainty across sectors. In contrast to transport methodologies, other sectors are characterized by a narrow focus on sources of measurement uncertainty and a neglect of economic effects ('market leakages'). We do not argue that the rejection of transport methodologies was unjustified, but rather than many of the same problems are inherent in other sectors. Thus, the case of transport sheds light on fundamental problems in quantifying emission reductions under the CDM. We argue that a key theoretical attraction of the CDM-equalization of marginal abatement costs across all sectors-has been difficult to achieve in practice.

  6. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Period of construction; certification of commencement of operation. 25.133 Section 25.133 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period...

  7. Final construction of the C.R.E.O.L. 8 millimeter period hybrid undulator

    Energy Technology Data Exchange (ETDEWEB)

    Tesch, P.; Gallagher, J.; Elias, L. [Center for Research and Education in Optics and Lasers, Orlando, FL (United States)

    1995-12-31

    The construction of an 8 millimeter period hybrid undulator for the C.R.E.O.L. high power far-infared free electron laser has just been completed. This FEL is expected to come on-line in the fall of 1995 and produce close to a kilowatt of continuous power at wavelengths of 225 - 800 microns. The undulator has extremely precise mechanical tolerances and high field uniformity allowing for high electron beam recovery rates. Almost complete beam recovery is required for DC operation at high currents. A novel method for measuring the magnetic properties of individual magnets and sorting the magnets to reduce magnetic field errors will be reported. The peak field and phase errors of the undulator without the pole pieces are reduced through a magnet ordering procedure. These errors are further reduced by inserting and tuning adjustable pole pieces. The reduction of field errors through these two techniques will be presented. An analysis of the final undulator errors and the results of measurements of the mechanical tolerances will be presented.

  8. Long-Haul Truck Sleeper Heating Load Reduction Package for Rest Period Idling

    Energy Technology Data Exchange (ETDEWEB)

    Lustbader, Jason Aaron; Kekelia, Bidzina; Tomerlin, Jeff; Kreutzer, Cory J.; Yeakel, Skip; Adelman, Steven; Luo, Zhiming; Zehme, John

    2016-04-05

    Annual fuel use for sleeper cab truck rest period idling is estimated at 667 million gallons in the United States, or 6.8% of long-haul truck fuel use. Truck idling during a rest period represents zero freight efficiency and is largely done to supply accessory power for climate conditioning of the cab. The National Renewable Energy Laboratory's CoolCab project aims to reduce heating, ventilating, and air conditioning (HVAC) loads and resulting fuel use from rest period idling by working closely with industry to design efficient long-haul truck thermal management systems while maintaining occupant comfort. Enhancing the thermal performance of cab/sleepers will enable smaller, lighter, and more cost-effective idle reduction solutions. In addition, if the fuel savings provide a one- to three-year payback period, fleet owners will be economically motivated to incorporate them. For candidate idle reduction technologies to be implemented by original equipment manufacturers and fleets, their effectiveness must be quantified. To address this need, several promising candidate technologies were evaluated through experimentation and modeling to determine their effectiveness in reducing rest period HVAC loads. Load reduction strategies were grouped into the focus areas of solar envelope, occupant environment, conductive pathways, and efficient equipment. Technologies in each of these focus areas were investigated in collaboration with industry partners. The most promising of these technologies were then combined with the goal of exceeding a 30% reduction in HVAC loads. These technologies included 'ultra-white' paint, advanced insulation, and advanced curtain design. Previous testing showed more than a 35.7% reduction in air conditioning loads. This paper describes the overall heat transfer coefficient testing of this advanced load reduction technology package that showed more than a 43% reduction in heating load. Adding an additional layer of advanced insulation

  9. Long-Haul Truck Sleeper Heating Load Reduction Package for Rest Period Idling: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Lustbader, Jason; Kekelia, Bidzina; Tomerlin, Jeff; Kreutzer, Cory; Adelman, Steve; Yeakel, Skip; Luo, Zhiming; Zehme, John

    2016-03-24

    Annual fuel use for sleeper cab truck rest period idling is estimated at 667 million gallons in the United States, or 6.8% of long-haul truck fuel use. Truck idling during a rest period represents zero freight efficiency and is largely done to supply accessory power for climate conditioning of the cab. The National Renewable Energy Laboratory's CoolCab project aims to reduce heating, ventilating, and air conditioning (HVAC) loads and resulting fuel use from rest period idling by working closely with industry to design efficient long-haul truck thermal management systems while maintaining occupant comfort. Enhancing the thermal performance of cab/sleepers will enable smaller, lighter, and more cost-effective idle reduction solutions. In addition, if the fuel savings provide a one- to three-year payback period, fleet owners will be economically motivated to incorporate them. For candidate idle reduction technologies to be implemented by original equipment manufacturers and fleets, their effectiveness must be quantified. To address this need, several promising candidate technologies were evaluated through experimentation and modeling to determine their effectiveness in reducing rest period HVAC loads. Load reduction strategies were grouped into the focus areas of solar envelope, occupant environment, conductive pathways, and efficient equipment. Technologies in each of these focus areas were investigated in collaboration with industry partners. The most promising of these technologies were then combined with the goal of exceeding a 30% reduction in HVAC loads. These technologies included 'ultra-white' paint, advanced insulation, and advanced curtain design. Previous testing showed more than a 35.7% reduction in air conditioning loads. This paper describes the overall heat transfer coefficient testing of this advanced load reduction technology package that showed more than a 43% reduction in heating load. Adding an additional layer of advanced insulation

  10. Harm reduction in U.S. tobacco control: Constructions in textual news media.

    Science.gov (United States)

    Eversman, Michael H

    2015-06-01

    U.S. tobacco control has long emphasized abstinence, yet quitting smoking is hard and cessation rates low. Tobacco harm reduction alternatives espouse substituting cigarettes with safer nicotine and tobacco products. Policy shifts embracing tobacco harm reduction have increased media attention, yet it remains controversial. Discourse theory posits language as fluid, and socially constructed meaning as neither absolute nor neutral, elevating certain views over others while depicting "discursive struggle" between them. While an abstinence-based framework dominates tobacco policy, discourse theory suggests constructions of nicotine and tobacco use can change, for example by positioning tobacco harm reduction more favorably. Textual discourse analysis was used to explore constructions of tobacco harm reduction in 478 (308 original) U.S. textual news media articles spanning 1996-2014. Using keyword database sampling, retrieved articles were analyzed first as discrete recording units and then to identify emergent thematic content. Constructions of tobacco harm reduction shifted over this time, revealing tension among industry and policy interests through competing definitions of tobacco harm reduction, depictions of its underlying science, and accounts of regulatory matters including tobacco industry support for harm reduction and desired marketing and taxation legislation. Heightened salience surrounding tobacco harm reduction and electronic cigarettes suggests their greater acceptance in U.S. tobacco control. Various media depictions construct harm reduction as a temporary means to cessation, and conflict with other constructions of it that place no subjective value on continued "safer" tobacco/nicotine use. Constructions of science largely obscure claims of the veracity of tobacco harm reduction, with conflict surrounding appropriate public health benchmarks for tobacco policy and health risks of nicotine use. Taxation policies and e-cigarette pricing relative to

  11. A Theory for the Incubation Period Following a Stress Reduction During Creep

    DEFF Research Database (Denmark)

    Bilde-Sørensen, Jørgen

    1978-01-01

    incubation period is much shorter than the time needed to establish an equilibrium structure at the new lower stress. The dependence of dislocation line tension upon line length is taken into account; as a result of this, recovery rates are predicted to depend on stress to a power larger than three......A dislocation model is presented for the phenomena following a stress reduction during creep. It is suggested that an incubation period for the production of new mobile dislocations arises because attractive junctions on the verge of breaking just before the stress reduction are no longer so after...... the stress reduction. The breaking stress of the junctions must be lowered by climb movements in the surrounding network before the junctions can break and release new mobile dislocations. On the basis of these concepts, an expression is derived for the length of the incubation period. This theoretical...

  12. Constraints to 3R construction waste reduction among contractors in Penang

    Science.gov (United States)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2018-04-01

    Rapid development of construction industry increases construction waste on landfill leading to shorter life span of the landfill. Waste reduction through Reduce, Reuse and Recycle (3R) practice has been encouraged in construction industry towards sustainable waste management since couple of decades ago. However, waste reduction through 3R is still at its infancy in construction industry in Penang, Malaysia. The aim of this paper is to determinate the constraints to construction waste reduction through 3R among contractors in Penang. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 based in Penang, experts from Penang Local Authority, CIDB in Penang and its headquarters, National Solid Waste Management Department, and headquarters of Solid Waste and Public Cleansing Management Corporation (SWCorp). Based on interviews and questionnaire surveys, constraints identified are Time and cost, Contractor’s attitude and low participation, Lack of enforcement law and regulation, Lack of awareness and knowledge, Lack of coordination, and Lack of space. Awareness and knowledge, and enforcement law and regulation are the major barriers which influence others constraints as well. Therefore, these constraints should be emphasized by the authorities in order to improve the implementation of 3R construction waste reduction.

  13. Reduction of construction wastes by improving construction contract management: a multinational evaluation.

    Science.gov (United States)

    Mendis, Daylath; Hewage, Kasun N; Wrzesniewski, Joanna

    2013-10-01

    The Canadian construction industry generates 30% of the total municipal solid waste deposited in landfills. Ample evidence can be found in the published literature about rework and waste generation due to ambiguity and errors in contract documents. Also, the literature quotes that disclaimer clauses in contract documents are included in the contractual agreements to prevent contractor claims, which often cause rework. Our professional practice has also noted that there are several disclaimer clauses in standard contract documents which have the potential to cause rework (and associated waste). This article illustrates a comparative study of standard contractual documents and their potential to create rework (and associated waste) in different regions of the world. The objectives of this study are (1) to analyse standard contractual documents in Canada, the USA and Australia in terms of their potential to generate rework and waste, and (2) to propose changes/amendments to the existing standard contract documents to minimise/avoid rework. In terms of construction waste management, all the reviewed standard contract documents have deficiencies. The parties that produce the contract documents include exculpatory clauses to avoid the other party's claims. This approach tends to result in rework and construction waste. The contractual agreements/contract documents should be free from errors, deficiencies, ambiguity and unfair risk transfers to minimise/avoid potential to generate rework and waste.

  14. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong.

    Science.gov (United States)

    Jaillon, L; Poon, C S; Chiang, Y H

    2009-01-01

    As Hong Kong is a compact city with limited available land and high land prices, the construction of high-rise buildings is prevalent. The construction industry produces a significant amount of building waste. In 2005, about 21.5 million tonnes of construction waste were generated, of which 11% was disposed of in landfills and 89% in public filling areas. At the present rate, Hong Kong will run out of both public filling areas and landfill space within the next decade. The government is taking action to tackle the problem, such as by introducing a construction waste landfill charge, and promoting prefabrication to reduce on-site waste generation. This paper reports an ongoing study on the use of prefabrication in buildings and its impact on waste reduction in Hong Kong. A questionnaire survey was administered to experienced professionals, and case studies of recently completed building projects were conducted. The results revealed that construction waste reduction is one of the major benefits when using prefabrication compared with conventional construction. The average wastage reduction level was about 52%. This implies that a wider use of prefabrication could considerably reduce construction waste generation in Hong Kong and alleviate the burdens associated with its management.

  15. Barriers and Motivations for Construction Waste Reduction Practices in Costa Rica

    Directory of Open Access Journals (Sweden)

    Lilliana Abarca-Guerrero

    2017-12-01

    Full Text Available Low- and middle-income countries lag behind in research that is related to the construction industry and the waste problems that the sector is facing. Literature shows that waste reduction and recycling have received a continuous interest from researchers, but mainly from developed countries. Few reports from low- and middle-income countries are concerned about the reuse of masonry, concrete, and mortar in clay based building ceramics or recycling construction waste, but mostly in relation to concrete aggregates. Furthermore, few authors have described the major barriers and motivations for construction waste reduction. The objective of this paper is to report the findings on a research performed in Costa Rica with the objective to determine the barriers and motivations that the construction sector is facing to improve the management of the construction materials. The study is based on data collected in two phases. During the first phase, a survey was sent via e-mail to 419 main contractors registered at the School Federation of Engineers and Architects (CFIA. The second phase consisted of a focus group discussion with 49 professionals from the construction industry to analyse and validate the findings from the survey. Descriptive statistic methods helped to draw the conclusions. The result of the research is a comprehensive list of observed barriers and motivations for waste reduction practices in the construction sector. These are not only applicable to Costa Rica, but can be used as a guide for similar studies in other low- and middle-income countries.

  16. Flood reduction as an ecosystem service of constructed wetlands for combined sewer overflow

    Science.gov (United States)

    Rizzo, A.; Bresciani, R.; Masi, F.; Boano, F.; Revelli, R.; Ridolfi, L.

    2018-05-01

    Urban runoff negatively impacts the receiving streams and different solutions have been proposed in literature to limit the effect of urbanization on the water balance. These solutions suggest to manage urban runoff in order to switch from a post-development river hydrograph (high peak and short duration) back again to a pre-development hydrograph (low peak and high duration). Combined sewer overflows (CSOs) represent severe pollutant sources for receiving streams due to the combination of first flush of roads and sewers and black water conveyed by combined sewer systems. Constructed wetlands for CSO treatment (CSO-CWs) are adopted with increasing frequency for reducing pollutant inputs to streams. Moreover, these systems exhibit the characteristic to behave similarly to ponds, wetlands, and bioretention systems that provide flood mitigation by decreasing the intensity of peak flows. This work aims to show the additional ecosystem service provided by CSO-CWs in term of limitation of the hydraulic impact of CSO on stream hydrograph. A mathematical model is developed to simulate the hydraulic behavior of a real case study situated in Gorla Maggiore (Italy), which includes vertical flow subsurface beds (VF) as first stage and a free water surface bed (FWS) as second stage. The model simulates the unsaturated flow within VF and the accumulation of water on the top of VF and within FWS. Results show a satisfactory lamination performance of the system for both single and up to 5 consecutive flood events, with a peak flow reduction ranging from 52.7% to 95.4%. Withdrawn of flow rate from the river in order to cope with long dry period does not significantly affect the lamination performances. The considered CSO-CW exhibits an excellent lamination efficiency also during more intense floods events, with a peak flow reduction of 86.2% for a CSO event with return period of 10 years. The flow rate frequency density function determined by the CSO-CW is more shifted towards

  17. Study on design method and vibration reduction characteristic of floating raft with periodic structure

    Science.gov (United States)

    Fang, Yuanyuan; Zuo, Yanyan; Xia, Zhaowang

    2018-03-01

    The noise level is getting higher with the development of high-power marine power plant. Mechanical noise is one of the most obvious noise sources which not only affect equipment reliability, riding comfort and working environment, but also enlarge underwater noise. The periodic truss type device which is commonly applied in fields of aerospace and architectural is introduced to floating raft construction in ship. Four different raft frame structure are designed in the paper. The vibration transmissibility is taken as an evaluation index to measure vibration isolation effect. A design scheme with the best vibration isolation effect is found by numerical method. Plate type and the optimized periodic truss type raft frame structure are processed to experimental verify vibration isolation effect of the structure of the periodic raft. The experimental results demonstrate that the same quality of the periodic truss floating raft has better isolation effect than that of the plate type floating raft.

  18. Quantitative Decision Making Model for Carbon Reduction in Road Construction Projects Using Green Technologies

    Directory of Open Access Journals (Sweden)

    Woosik Jang

    2015-08-01

    Full Text Available Numerous countries have established policies for reducing greenhouse gas emissions and have suggested goals pertaining to these reductions. To reach the target reduction amounts, studies on the reduction of carbon emissions have been conducted with regard to all stages and processes in construction projects. According to a study on carbon emissions, the carbon emissions generated during the construction stage of road projects account for approximately 76 to 86% of the total carbon emissions, far exceeding the other stages, such as maintenance or demolition. Therefore, this study aims to develop a quantitative decision making model that supports the application of green technologies (GTs to reduce carbon emissions during the construction stage of road construction projects. First, the authors selected environmental soundness, economic feasibility and constructability as the key assessment indices for evaluating 20 GTs. Second, a fuzzy set/qualitative comparative analysis (FS/QCA was used to establish an objective decision-making model for the assessment of both the quantitative and qualitative characteristics of the key indices. To support the developed model, an expert survey was performed to assess the applicability of each GT from a practical perspective, which was verified with a case study using two additional GTs. The proposed model is expected to support practitioners in the application of suitable GTs to road projects and reduce carbon emissions, resulting in better decision making during road construction projects.

  19. Sensitivity Enhancement in Low Cutoff Wavelength Long-Period Fiber Gratings by Cladding Diameter Reduction

    Directory of Open Access Journals (Sweden)

    Ignacio Del Villar

    2017-09-01

    Full Text Available The diameter of long-period fiber gratings (LPFGs fabricated in optical fibers with a low cutoff wavelength was be reduced by hydrofluoric acid etching, enhancing the sensitivity to refractive index by more than a factor of 3, to 2611 nm/refractive index unit in the range from 1.333 to 1.4278. The grating period selected for the LPFGs allowed access to the dispersion turning point at wavelengths close to the visible range of the optical spectrum, where optical equipment is less expensive. As an example of an application, a pH sensor based on the deposition of a polymeric coating was analyzed in two situations: with an LPFG without diameter reduction and with an LPFG with diameter reduction. Again, a sensitivity increase of a factor of near 3 was obtained, demonstrating the ability of this method to enhance the sensitivity of thin-film-coated LPFG chemical sensors.

  20. Sensitivity Enhancement in Low Cutoff Wavelength Long-Period Fiber Gratings by Cladding Diameter Reduction.

    Science.gov (United States)

    Del Villar, Ignacio; Partridge, Matthew; Rodriguez, Wenceslao Eduardo; Fuentes, Omar; Socorro, Abian Bentor; Diaz, Silvia; Corres, Jesus Maria; James, Stephen Wayne; Tatam, Ralph Peter

    2017-09-13

    The diameter of long-period fiber gratings (LPFGs) fabricated in optical fibers with a low cutoff wavelength was be reduced by hydrofluoric acid etching, enhancing the sensitivity to refractive index by more than a factor of 3, to 2611 nm/refractive index unit in the range from 1.333 to 1.4278. The grating period selected for the LPFGs allowed access to the dispersion turning point at wavelengths close to the visible range of the optical spectrum, where optical equipment is less expensive. As an example of an application, a pH sensor based on the deposition of a polymeric coating was analyzed in two situations: with an LPFG without diameter reduction and with an LPFG with diameter reduction. Again, a sensitivity increase of a factor of near 3 was obtained, demonstrating the ability of this method to enhance the sensitivity of thin-film-coated LPFG chemical sensors.

  1. Sleeper Cab Climate Control Load Reduction for Long-Haul Truck Rest Period Idling

    Energy Technology Data Exchange (ETDEWEB)

    Lustbader, J. A.; Kreutzer, C.; Adelman, S.; Yeakel, S.; Zehme, J.

    2015-04-29

    Annual fuel use for long-haul truck rest period idling is estimated at 667 million gallons in the United States. The U.S. Department of Energy’s National Renewable Energy Laboratory’s CoolCab project aims to reduce heating, ventilating, and air conditioning (HVAC) loads and resulting fuel use from rest period idling by working closely with industry to design efficient long-haul truck climate control systems while maintaining occupant comfort. Enhancing the thermal performance of cab/sleepers will enable smaller, lighter, and more cost-effective idle reduction solutions. In order for candidate idle reduction technologies to be implemented at the original equipment manufacturer and fleet level, their effectiveness must be quantified. To address this need, a number of promising candidate technologies were evaluated through experimentation and modeling to determine their effectiveness in reducing rest period HVAC loads. For this study, load reduction strategies were grouped into the focus areas of solar envelope, occupant environment, and conductive pathways. The technologies selected for a complete-cab package of technologies were “ultra-white” paint, advanced insulation, and advanced curtains. To measure the impact of these technologies, a nationally-averaged solar-weighted reflectivity long-haul truck paint color was determined and applied to the baseline test vehicle. Using the complete-cab package of technologies, electrical energy consumption for long-haul truck daytime rest period air conditioning was reduced by at least 35% for summer weather conditions in Colorado. The National Renewable Energy Laboratory's CoolCalc model was then used to extrapolate the performance of the thermal load reduction technologies nationally for 161 major U.S. cities using typical weather conditions for each location over an entire year.

  2. A CONCEPTUAL DISASTER RISK REDUCTION FRAMEWORK FOR HEALTH AND SAFETY HAZARDS IN THE CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Amir S. GOHARDANI

    2013-06-01

    Full Text Available The health and safety hazard status of construction workers is constantly challenged by the projects in the built environment. In this article, various aspects of health and safety hazards for construction workers have been reviewed and investigated through a disaster risk reduction prism. This approach has further led to the perception of glancing at the construction sector as an ongoing disaster zone and equally provides a new management perspective. From this perspective, the occurrence of a disaster within the construction sector corresponds to the temporary or permanent ill-health or death of a construction worker. Geographical location is one of the factors that play an important role in addressing the health and safety hazards for construction workers. In addition to the location, geographical considerations equally encapsulate regional, cultural, governmental and work ethical effects. These effects may potentially contribute to disparities in the construction sector. With an increasing level of understanding for health and safety hazards in the construction domain, more efficient prevention measures can be taken in order to enable a disaster management cycle, capable of responding to the rigorous demands of the construction sector.

  3. A periodic piezoelectric smart structure with the integrated passive/active vibration-reduction performances

    Science.gov (United States)

    Wang, Yuxi; Niu, Shengkai; Hu, Yuantai

    2017-06-01

    The paper proposes a new piezoelectric smart structure with the integrated passive/active vibration-reduction performances, which is made of a series of periodic structural units. Every structural unit is made of two layers, one is an array of piezoelectric bimorphs (PBs) and one is an array of metal beams (MBs), both are connected as a whole by a metal plate. Analyses show that such a periodic smart structure possesses two aspects of vibration-reduction performance: one comes from its phonon crystal characteristics which can isolate those vibrations with the driving frequency inside the band gap(s). The other one comes from the electromechanical conversion of bent PBs, which is actively aimed at those vibrations with the driving frequency outside the band gap(s). By adjusting external inductance, the equivalent circuit of the proposed structure can be forced into parallel resonance such that most of the vibration energy is converted into electrical energy for dissipation by a resistance. Thus, an external circuit under the parallel resonance state is equivalent to a strong damping to the interrelated vibrating structure, which is just the action mechanism of the active vibration reduction performance of the proposed smart structure.

  4. EVALUATION OF PRODUCTION IN SEASONALITY PERIODS: ANALYSIS OF THE CONSTRUCTION INDUSTRY IN BRAZIL

    Directory of Open Access Journals (Sweden)

    Marcos William Kaspchak Machado

    2013-06-01

    Full Text Available The present work has as an objective to evaluate the impacts of production seasonality in seasonality periods in the Brazilian construction industry. The adopted methodology was based on the qualitative and quantitative approaches of the aspects inherent to the seasonality factors in the construction industry and its possible causes. Besides that, literature data were collected in year report books and devices provided by institutions of the sector. The results demonstrated the importance of production management mechanisms to optimize the use of productive factors through cost analysis, which are fundamental to understand the operational flux of resources used in the operational media. Obtaining this information, connected to market indicators helped in the decision making process related to the development of prospective scenarios which will give support to the decision making strategy aiming to stabilize the production levels.

  5. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Vaugh Whisker

    2004-02-28

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project.

  6. Design, construction, and operation of the contact size reduction facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Frank, D.E.; Reeves, S.R.; Valenti, P.J.

    1988-05-01

    This paper describes the design, construction and initial operation of the Contact-Handled Size Reduction Facility (CSRF) at the West Valley Demonstration Project. The facility was constructed to size reduce contaminated tanks, piping, and other metallic scrap and package the scrap for disposal. In addition, the CSRF has the capability to decontaminate scrap prior to disposal. The anticipated result of decontaminating the scrap is to reduce waste classified as transuranic or low-level Class B and C to Class A or release for unrestricted use as nonradioactive equipment. 10 figs., 1 tab

  7. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    International Nuclear Information System (INIS)

    Timothy Shaw; Vaugh Whisker

    2004-01-01

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project

  8. Noise reduction in long‐period seismograms by way of array summing

    Science.gov (United States)

    Ringler, Adam; Wilson, David; Storm, Tyler; Marshall, Benjamin T.; Hutt, Charles R.; Holland, Austin

    2016-01-01

    Long‐period (>100  s period) seismic data can often be dominated by instrumental noise as well as local site noise. When multiple collocated sensors are installed at a single site, it is possible to improve the overall station noise levels by applying stacking methods to their traces. We look at the noise reduction in long‐period seismic data by applying the time–frequency phase‐weighted stacking method of Schimmel and Gallart (2007) as well as the phase‐weighted stacking (PWS) method of Schimmel and Paulssen (1997) to four collocated broadband sensors installed in the quiet Albuquerque Seismological Laboratory underground vault. We show that such stacking methods can improve vertical noise levels by as much as 10 dB over the mean background noise levels at 400 s period, suggesting that greater improvements could be achieved with an array involving multiple sensors. We also apply this method to reduce local incoherent noise on horizontal seismic records of the 2 March 2016 Mw 7.8 Sumatra earthquake, where the incoherent noise levels at very long periods are similar in amplitude to the earthquake signal. To maximize the coherency, we apply the PWS method to horizontal data where relative azimuths between collocated sensors are estimated and compared with a simpler linear stack with no azimuthal rotation. Such methods could help reduce noise levels at various seismic stations where multiple high‐quality sensors have been deployed. Such small arrays may also provide a solution to improving long‐period noise levels at Global Seismographic Network stations.

  9. On kinetics of carbothermal reduction of subgroup 2A elements of the Periodic chart

    International Nuclear Information System (INIS)

    Vodop'yanov, A.G.; AN SSSR, Sverdlovsk. Inst. Metallurgii)

    1984-01-01

    An attempt was made on the basis of a new version of Periodical system to clarify the general regularities of kinetics and transformation mechanism of metal oxides of 2nd A subgroup during their interaction with carbon (in furnaces at approximately 1700-2300 K). According to a new version of Periodic system Ca, Sr, Ba represent both type- and shell-analogs and Ra-shrink-analog of barium. Their full-valent cations in corresponding oxides possess similar structure corresponding to external electronic shells of inert gases with vacant α-shells. Be and Mg represent only type-analogs. Their full-valent cations in corresponding oxides possess ionic electronic structure corresponding to external S 2 - and S 2 p 6 -shells. It is shown that during interaction of solid oxides of 2nd A subgroup elements with carbon similarity of physicochemical properties of type-analog elements is manifested by the presence of common reduction mechanism - interaction proceeds through the gaseous phase with participation of CO as reducer, carbon regenerates CO and forms carbides of corresponding elements. The expected close similarity of properties for oxides of shell-analog elements s manifested additionally in the form of common dependence of change of rate constant of oxide transformation on the value of Gibbs free energy of reduction by carbon up to the vapor of correspondng metal

  10. Specification, construction, and exact reduction of state transition system models of biochemical processes.

    Science.gov (United States)

    Bugenhagen, Scott M; Beard, Daniel A

    2012-10-21

    Biochemical reaction systems may be viewed as discrete event processes characterized by a number of states and state transitions. These systems may be modeled as state transition systems with transitions representing individual reaction events. Since they often involve a large number of interactions, it can be difficult to construct such a model for a system, and since the resulting state-level model can involve a huge number of states, model analysis can be difficult or impossible. Here, we describe methods for the high-level specification of a system using hypergraphs, for the automated generation of a state-level model from a high-level model, and for the exact reduction of a state-level model using information from the high-level model. Exact reduction is achieved through the automated application to the high-level model of the symmetry reduction technique and reduction by decomposition by independent subsystems, allowing potentially significant reductions without the need to generate a full model. The application of the method to biochemical reaction systems is illustrated by models describing a hypothetical ion-channel at several levels of complexity. The method allows for the reduction of the otherwise intractable example models to a manageable size.

  11. Prediction of the period of psychotic episode in individual schizophrenics by simulation-data construction approach.

    Science.gov (United States)

    Huang, Chun-Jung; Wang, Hsiao-Fan; Chiu, Hsien-Jane; Lan, Tsuo-Hung; Hu, Tsung-Ming; Loh, El-Wui

    2010-10-01

    Although schizophrenia can be treated, most patients still experience inevitable psychotic episodes from time to time. Precautious actions can be taken if the next onset can be predicted. However, sufficient information is always lacking in the clinical scenario. A possible solution is to use the virtual data generated from limited of original data. Data construction method (DCM) has been shown to generate the virtual felt earthquake data effectively and used in the prediction of further events. Here we investigated the performance of DCM in deriving the membership functions and discrete-event simulations (DES) in predicting the period embracing the initiation and termination time-points of the next psychotic episode of 35 individual schizophrenic patients. The results showed that 21 subjects had a success of simulations (RSS) ≥70%. Further analysis demonstrated that the co-morbidity of coronary heart diseases (CHD), risks of CHD, and the frequency of previous psychotic episodes increased the RSS.

  12. Radon reduction and radon-resistant construction demonstrations in New York state. Final report

    International Nuclear Information System (INIS)

    1991-02-01

    A survey of radon levels in New York State homes indicates that approximately 4.4 percent of the homes have long-term living area radon concentrations above the U.S. EPA guideline of four pCi/l. The project addressed the effectiveness of techniques to reduce the radon level in existing homes and to prevent the occurrence of high radon concentrations in new homes. The goal of the project was to demonstrate the effectiveness of radon reduction techniques in homes containing indoor radon concentrations of more than the current EPA guidelines of four pCi/l. At the same time, radon-resistant construction techniques were demonstrated in homes under construction to provide guidelines for houses being built in areas with a danger of high radon levels. The project demonstrated new radon mitigation techniques in homes containing indoor radon concentrations exceeding four pCi/l; assessed the value of previously installed radon reduction procedures, and demonstrated new radon-resistant construction methods

  13. Water reduction by constructed wetlands treating waste landfill leachate in a tropical region.

    Science.gov (United States)

    Ogata, Yuka; Ishigaki, Tomonori; Ebie, Yoshitaka; Sutthasil, Noppharit; Chiemchaisri, Chart; Yamada, Masato

    2015-10-01

    One of the key challenges in landfill leachate management is the prevention of environmental pollution by the overflow of untreated leachate. To evaluate the feasibility of constructed wetlands (CWs) for the treatment of waste landfill leachate in tropical regions, water reduction and pollutant removal by a CW subjected to different flow patterns (i.e., horizontal subsurface flow (HSSF) and free water surface (FWS)) were examined in both rainy and dry seasons in Thailand. A pilot-scale CW planted with cattail was installed at a landfill site in Thailand. With HSSF, the CW substantially removed pollutants from the landfill leachate without the need to harvest plants, whereas with FWS, it only slightly removed pollutants. Under both flow patterns, the CW significantly reduced the leachate volume to a greater extent than surface evaporation, which is regarded as an effect of the storage pond. Additionally, water reduction occurred regardless of season and precipitation, within the range 0-9 mm d(-1). In the case of low feeding frequency, water reduction by the CW with HSSF was lower than that with FWS. However, high feeding frequency improved water reduction by the CW with HSSF and resulted in a similar reduction to that observed with FWS, which exhibited maximum evapotranspiration. In terms of water reduction, with both HSSF in conjunction with high frequency feeding and FWS, the CW provided a high degree of evapotranspiration. However, pollutant removal efficiencies with HSSF were higher than for FWS. The present study suggested that CWs with HSSF and high frequency feeding could be useful for the prevention of uncontrollable dispersion of polluted leachate in the tropical climate zone. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    Science.gov (United States)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  15. Aerobic Interval Exercise Training Induces Greater Reduction in Cardiac Workload in the Recovery Period in Rats

    International Nuclear Information System (INIS)

    Borges, Juliana Pereira; Masson, Gustavo Santos; Tibiriçá, Eduardo; Lessa, Marcos Adriano

    2014-01-01

    Aerobic interval exercise training has greater benefits on cardiovascular function as compared with aerobic continuous exercise training. The present study aimed at analyzing the effects of both exercise modalities on acute and subacute hemodynamic responses of healthy rats. Thirty male rats were randomly assigned into three groups as follows: continuous exercise (CE, n = 10); interval exercise (IE, n = 10); and control (C, n = 10). Both IE and CE groups performed a 30-minute exercise session. The IE group session consisted of three successive 4-minute periods at 60% of maximal velocity (Max Vel), with 4-minute recovery intervals at 40% of Max Vel. The CE group ran continuously at 50% of Max Vel. Heart rate (HR), blood pressure(BP), and rate pressure product (RPP) were measured before, during and after the exercise session. The CE and IE groups showed an increase in systolic BP and RPP during exercise as compared with the baseline values. After the end of exercise, the CE group showed a lower response of systolic BP and RPP as compared with the baseline values, while the IE group showed lower systolic BP and mean BP values. However, only the IE group had a lower response of HR and RPP during recovery. In healthy rats, one interval exercise session, as compared with continuous exercise, induced similar hemodynamic responses during exercise. However, during recovery, the interval exercise caused greater reductions in cardiac workload than the continuous exercise

  16. Aerobic Interval Exercise Training Induces Greater Reduction in Cardiac Workload in the Recovery Period in Rats

    Science.gov (United States)

    Borges, Juliana Pereira; Masson, Gustavo Santos; Tibiriçá, Eduardo; Lessa, Marcos Adriano

    2014-01-01

    Background Aerobic interval exercise training has greater benefits on cardiovascular function as compared with aerobic continuous exercise training. Objective The present study aimed at analyzing the effects of both exercise modalities on acute and subacute hemodynamic responses of healthy rats. Methods Thirty male rats were randomly assigned into three groups as follows: continuous exercise (CE, n = 10); interval exercise (IE, n = 10); and control (C, n = 10). Both IE and CE groups performed a 30-minute exercise session. The IE group session consisted of three successive 4-minute periods at 60% of maximal velocity (Max Vel), with 4-minute recovery intervals at 40% of Max Vel. The CE group ran continuously at 50% of Max Vel. Heart rate (HR), blood pressure(BP), and rate pressure product (RPP) were measured before, during and after the exercise session. Results The CE and IE groups showed an increase in systolic BP and RPP during exercise as compared with the baseline values. After the end of exercise, the CE group showed a lower response of systolic BP and RPP as compared with the baseline values, while the IE group showed lower systolic BP and mean BP values. However, only the IE group had a lower response of HR and RPP during recovery. Conclusion In healthy rats, one interval exercise session, as compared with continuous exercise, induced similar hemodynamic responses during exercise. However, during recovery, the interval exercise caused greater reductions in cardiac workload than the continuous exercise. PMID:24270864

  17. Heart rate variability biofeedback intervention for reduction of psychological stress during the early postpartum period.

    Science.gov (United States)

    Kudo, Naoko; Shinohara, Hitomi; Kodama, Hideya

    2014-12-01

    This study examined the effectiveness of heart rate variability (HRV) biofeedback intervention for reduction of psychological stress in women in the early postpartum period. On postpartum day 4, 55 healthy subjects received a brief explanation about HRV biofeedback using a portable device. Among them, 25 mothers who agreed to implement HRV biofeedback at home were grouped as the biofeedback group, and other 30 mothers were grouped as the control group. At 1 month postpartum, there was a significant decrease in total Edinburgh Postnatal Depression Scale score (P biofeedback group; this change was brought about mainly by decreases in items related to anxiety or difficulty sleeping. There was also a significant increase in standard deviation of the normal heartbeat interval (P biofeedback group after adjusting for potential covariates. In conclusion, postpartum women who implemented HRV biofeedback after delivery were relatively free from anxiety and complained less of difficulties sleeping at 1 month postpartum. Although the positive effects of HRV biofeedback may be partly attributable to intervention effects, due to its clinical outcome, HRV biofeedback appears to be recommendable for many postpartum women as a feasible health-promoting measure after childbirth.

  18. Aerobic Interval Exercise Training Induces Greater Reduction in Cardiac Workload in the Recovery Period in Rats

    Energy Technology Data Exchange (ETDEWEB)

    Borges, Juliana Pereira, E-mail: julipborges@gmail.com; Masson, Gustavo Santos; Tibiriçá, Eduardo; Lessa, Marcos Adriano [Instituto Oswaldo Cruz - FIOCRUZ, Rio de Janeiro, RJ (Brazil)

    2014-01-15

    Aerobic interval exercise training has greater benefits on cardiovascular function as compared with aerobic continuous exercise training. The present study aimed at analyzing the effects of both exercise modalities on acute and subacute hemodynamic responses of healthy rats. Thirty male rats were randomly assigned into three groups as follows: continuous exercise (CE, n = 10); interval exercise (IE, n = 10); and control (C, n = 10). Both IE and CE groups performed a 30-minute exercise session. The IE group session consisted of three successive 4-minute periods at 60% of maximal velocity (Max Vel), with 4-minute recovery intervals at 40% of Max Vel. The CE group ran continuously at 50% of Max Vel. Heart rate (HR), blood pressure(BP), and rate pressure product (RPP) were measured before, during and after the exercise session. The CE and IE groups showed an increase in systolic BP and RPP during exercise as compared with the baseline values. After the end of exercise, the CE group showed a lower response of systolic BP and RPP as compared with the baseline values, while the IE group showed lower systolic BP and mean BP values. However, only the IE group had a lower response of HR and RPP during recovery. In healthy rats, one interval exercise session, as compared with continuous exercise, induced similar hemodynamic responses during exercise. However, during recovery, the interval exercise caused greater reductions in cardiac workload than the continuous exercise.

  19. The perspectives of research in the construction field in Romania during the 2014-2020 period

    OpenAIRE

    Mihai VRABIE; Sergiu-Andrei BĂETU

    2013-01-01

    The construction field represents an important part of the Romanian economy (and of UE), with a strong social impact on the quality of citizen life. Naturally, the research from the construction field should be a priority in research and innovation activity. However, the research programs recently launched (Horizon 2020, from EU, and the Strategy of Research and Innovation 2014-2020 in Romania), don’t mention the construction field as an explicit priority. Under these conditions, we can speak...

  20. Construction of 2D quasi-periodic Rauzy tiling by similarity transformation

    International Nuclear Information System (INIS)

    Zhuravlev, V. G.; Maleev, A. V.

    2009-01-01

    A new approach to constructing self-similar fractal tilings is proposed based on the construction of semigroups generated by a finite set of similarity transformations. The Rauzy tiling-a 2D analog of 1D Fibonacci tiling generated by the golden mean-is used as an example to illustrate this approach. It is shown that the Rauzy torus development and the elementary fractal boundary of Rauzy tiling can be constructed in the form of a set of centers of similarity semigroups generated by two and three similarity transformations, respectively. A centrosymmetric tiling, locally dual to the Rauzy tiling, is constructed for the first time and its parameterization is developed.

  1. The history of the construction of main state irrigation systems in the postwar period

    Directory of Open Access Journals (Sweden)

    A. N. Chepurda

    2017-03-01

    It was established that the construction of large public irrigation systems in Ukraine started in 1951 stated that hydro construction that unfolded in the south of Ukraine, opened prospects to final elimination of the impact of drought and dry winds, the prospects for an unprecedented economic prosperity of the area.

  2. Reduction of Friction of Metals Using Laser-Induced Periodic Surface Nanostructures

    OpenAIRE

    Zhuo Wang; Quanzhong Zhao; Chengwei Wang

    2015-01-01

    We report on the effect of femtosecond-laser-induced periodic surface structures (LIPSS) on the tribological properties of stainless steel. Uniform periodic nanostructures were produced on AISI 304L (American Iron and Steel Institute steel grade) steel surfaces using an 800-nm femtosecond laser. The spatial periods of LIPSS measured by field emission scanning electron microscopy ranged from 530 to 570 nm. The tribological properties of smooth and textured surfaces with periodic nanostructures...

  3. [Research on the hospital construction and structure in Daehan empire and colonial modern period].

    Science.gov (United States)

    Han, Dong Gwan; Ryu, Chang Ug; Ko, Sang Kyun; Jung, Jae Kook; Moon, Jong Youn; Park, Yoon Hyung

    2011-12-31

    It was the late Chosun Dynasty and Daehan Empire era that Western Medicine has firstly been introduced to Korea, previously operating on a basis of Korean traditional medicine. Western Medicine has been introduced by American missionary and Japanese Imperialism. An introduction of Western Medicine made it feasible to proceed new type medical care including operation, leading to require a new form of medical facilities. In the beginning, new facilities were constructed by Japanese Imperialism. Other hand many of facilities including Severance Hospital were established by missionaries. First of all, Daehan Empire established and managed a modern type of medical facility named "Jejoongwon" in 1885 as a government institution hospital. The Red Cross Hospital built in 1889. Afterwards, Jejoongwon and the Red Cross Hospital were taken over to missionary hospital and Japanese Imperialism, respectively. Japanese Imperialists firstly have protected their nationals residing in Chosun but have proceeded care a few Chosun people to exploit medical treatment as a mean to advertise superiority of the Empire of Japan. The facility that has firstly been established and managed was Jeseang Hospital in Busan in 1877, leading to establish in Wonju, Wonsan, and Mokpo. Afterwards, Japan has organized "Donginhoi" as a civil invasion organization, leading for "Donginhoi" to established "Dongin Hospital" in Pyeongyang, Daegu, and Seoul. Since 1909, governmental leading medical facility named Jahye Hospital was established according to an imperial order, leading to establish 32 hospitals all over the nation. American missionaries have established and managed 28 hospitals started from Severance Hospital built in 1904. However, Chosun doctors started to having educated and opening up their own hospital since 1920, leading for many of medical facilities to be established, but most of them have taken different roles followed by 6.25 War and economic development period. However, some of them

  4. The construction of periodic unfolding operators on some compact Riemannian manifolds

    DEFF Research Database (Denmark)

    Dobberschütz, Sören; Böhm, Michael

    2014-01-01

    The notion of periodic unfolding has become a standard tool in the theory of periodic homogenization. However, all the results obtained so far are only applicable to the "flat" Euclidean space R n. In this paper, we present a generalization of the method of periodic unfolding applicable to struct...

  5. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    Science.gov (United States)

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  6. 42 CFR 409.63 - Reduction of inpatient psychiatric benefit days available in the initial benefit period.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Reduction of inpatient psychiatric benefit days available in the initial benefit period. 409.63 Section 409.63 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICARE PROGRAM HOSPITAL INSURANCE BENEFITS Scope of...

  7. Reduction of Friction of Metals Using Laser-Induced Periodic Surface Nanostructures

    Directory of Open Access Journals (Sweden)

    Zhuo Wang

    2015-10-01

    Full Text Available We report on the effect of femtosecond-laser-induced periodic surface structures (LIPSS on the tribological properties of stainless steel. Uniform periodic nanostructures were produced on AISI 304L (American Iron and Steel Institute steel grade steel surfaces using an 800-nm femtosecond laser. The spatial periods of LIPSS measured by field emission scanning electron microscopy ranged from 530 to 570 nm. The tribological properties of smooth and textured surfaces with periodic nanostructures were investigated using reciprocating ball-on-flat tests against AISI 440C balls under both dry and starved oil lubricated conditions. The friction coefficient of LIPSS covered surfaces has shown a lower value than that of the smooth surface. The induced periodic nanostructures demonstrated marked potential for reducing the friction coefficient compared with the smooth surface.

  8. REDUCTION IN ELECTRICITY SUPPLIES DURING 'LIMITED POWER' PERIODS IN WINTER 1999-2000

    CERN Multimedia

    Mario Batz/TCR

    1999-01-01

    As in previous years, CERN signed contracts with EDF (Electricité de France) and with EOS (Energie Ouest Suisse), by which it undertakes, in return for special prices, to reduce its electricity consumption when the grids are at peak demand during the tariff period 'Effacement Jour de Pointe' (EJP).The contractual period for compulsory load shedding begins 1st November and ends 31st March. During these five months CERN will have to reduce its power consumption from210 MW to 40 MW during twenty-two 18-hour periods, each beginning at 7 a.m. and ending at 1 a.m. the following day. Notice will be given by EDF to the Technical Control Room (TCR) at 5 p.m. the previous day. The notice period may be reduced to two hours for days following weekends and public holidays, or omitted entirely for technical reasons.For the month of March 2000, the limit of power consumption will be increased from 40 MW to 50 MW to guarantee an easier start-up of the accelerators.During these periods, the PS complex, the SPS and ...

  9. Arthroscopy-assisted reduction of posteromedial tibial plateau fractures with buttress plate and cannulated screw construct.

    Science.gov (United States)

    Chiu, Chih-Hao; Cheng, Chun-Ying; Tsai, Min-Chain; Chang, Shih-Sheng; Chen, Alvin Chao-Yu; Chen, Yeung-Jen; Chan, Yi-Sheng

    2013-08-01

    To present the radiologic and clinical results of posteromedial fractures treated with arthroscopy-assisted reduction and buttress plate and cannulated screw fixation. Twenty-five patients with posteromedial tibial plateau fractures treated by the described technique were included in this study. According to the Schatzker classification, there were 5 type IV fractures (20%), 2 type V fractures (8%), and 18 type VI fractures (72%). The mean age at operation was 46 years (range, 21 to 79 years). The mean follow-up period was 86 months (range, 60 to 108 months). Clinical and radiologic outcomes were scored by the Rasmussen system. Subjective data were collected to assess swelling, difficulty climbing stairs, joint stability, ability to work and participate in sports, and overall patient satisfaction with recovery. Secondary osteoarthritis was diagnosed when radiographs showed a narrowed joint space in the injured knee at follow-up in comparison with the films taken at the time of injury. The mean postoperative Rasmussen clinical score was 25.9 (range, 18 to 29), and the mean radiologic score was 15.8 (range, 10 to 18). All 25 fractures achieved successful union, and 92% had good or excellent clinical and radiologic results. The 3 fracture types did not significantly differ in Rasmussen scores or rates of satisfactory results (P > .05). Secondary osteoarthritis was noted in 6 injured knees (24%). Arthroscopy-assisted reduction with buttress plate and cannulated screw fixation can restore posteromedial tibial plateau fractures of the knee with well-documented radiographic healing, good clinical outcomes, and low complication rates. Level IV, therapeutic case series. Copyright © 2013 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  10. Construction training process of highly skilled players in mini-football for competition period

    Directory of Open Access Journals (Sweden)

    Stasiuk I.I.

    2013-08-01

    Full Text Available Analyzed the structure and content of the competition period in mini-football. It was determined that the structure of the competition period consists of 4 competitive mesocycles. In each mesocycle includes various types of micro-cycles (competitive, cross-game and rehabilitation. Reflects the ratio of specific and non-specific (general preparations means training work. So in the competitive period for competitive mesocycles general preparations exercises ranged from 38.3 to 42.4%, special-preparation - from 29.9 to 32.6%, competitive - from 20.9 to 23.3%. The intensity of the training load in intergame microcycles less than competitive. This corresponds to the strategy of building the training process in the competitive period. During the competition period the ratio of the training load was: aerobic focus - 49.2%, mixed - 46.1%, anaerobic alactate - 2.4%, anaerobic glycolytic - 2.3%. Defines the scope and focus of the training load: longer the aerobic work, then - mixed, anaerobic- alactate and anaerobic-glycolytic. The comparative characteristics of the intensity of the training load in competitive and intergame microcycles.

  11. A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste.

    Science.gov (United States)

    Yuan, Hongping; Chini, Abdol R; Lu, Yujie; Shen, Liyin

    2012-03-01

    During the past few decades, construction and demolition (C&D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C&D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C&D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C&D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C&D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity - interrelationships and dynamics - of any social, economic and managerial system. The dynamic model integrates major variables that affect C&D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C&D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only built confidence in the model so that it can be used for quantitative analysis, but also assessed and compared the effect of three designed policy scenarios on C&D waste reduction. One major contribution of this study is the development of a dynamic model for evaluating C&D waste reduction strategies under various scenarios, so that best management strategies could be identified before being implemented

  12. Reduction of electricity comsumption during 'high cost' periods in winter 2005 - 2006

    CERN Multimedia

    Mario Batz

    2005-01-01

    In previous years CERN was able to limit its electricity consumption during the winter months sufficiently to be supplied from the Swiss grid. In order to make enough power available for the LHC machine and experiments at the lowest possible cost during the coming winter 2005 / 2006 CERN is supplied from the French grid by EDF (Electricité de France). As a consequence, when the grids are at peak demand during the tariff period 'Effacement Jour de Pointe' (EJP) in France, the energy price is at least four times as high as for the usual winter period. From 1st November until 31st March these increased prices are applicable during twenty-two 18-hour periods, each beginning at 7 a.m. and ending at 1 a.m. the following day. Notice will be given by EDF to the Technical Infrastructure Control Room (TI) at 5 p.m. the previous day. The notice period may be reduced to two hours for days following weekends and public holidays, or omitted entirely for technical reasons. During these days of EJP CERN has a strong fina...

  13. Reduction of electricity comsumption during 'high cost' periods in winter 2005 - 2006

    CERN Document Server

    Mario Batz

    2005-01-01

    In previous years CERN was able to sufficiently limit its electricity consumption during the winter months to be supplied from the Swiss grid. In order to make enough power available for the LHC machine and experiments at the lowest possible cost during the coming winter 2005 / 2006, CERN will be supplied from the French grid by EDF (Electricité de France). As a consequence, when the grids are at peak demand during the tariff period 'Effacement Jour de Pointe' (EJP) in France, the energy price is at least four times higher than for the usual winter period. From 1st November until 31st March these increased prices are applicable during twenty-two 18-hour periods, each beginning at 7 a.m. and ending at 1 a.m. the following day. Notice will be given by EDF to the Technical Infrastructure Control Room (TI) at 5 p.m. the previous day. The notice period may be reduced to two hours for days following weekends and public holidays, or omitted entirely for technical reasons. During these days of EJP CERN has a stro...

  14. A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste

    International Nuclear Information System (INIS)

    Yuan Hongping; Chini, Abdol R.; Lu Yujie; Shen Liyin

    2012-01-01

    Highlights: ► We proposes a model for projecting C and D waste reduction of construction projects. ► The model can simulate effects of various management strategies on waste reduction. ► The model integrates all essential variables that affect C and D waste reduction. ► By using the model, best strategies could be identified before being implemented. - Abstract: During the past few decades, construction and demolition (C and D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C and D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C and D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C and D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C and D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity – interrelationships and dynamics – of any social, economic and managerial system. The dynamic model integrates major variables that affect C and D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C and D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only

  15. Economic feasibility of surface flow constructed (SFCW) wetlands for reduction of water pollution from agricultural fields in Denmark

    DEFF Research Database (Denmark)

    Gachango, Florence Gathoni; Pedersen, Søren Marcus; Kjaergaard, Charlotte

    2014-01-01

    Constructed wetlands have been proposed as cost effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as study cases...

  16. Refinement of the charcoal meal study by reduction of the fasting period.

    Science.gov (United States)

    Prior, Helen; Ewart, Lorna; Bright, Jonathan; Valentin, Jean-Pierre

    2012-05-01

    The aim of this investigation was to determine whether a shorter fasting period than the one historically employed for the charcoal meal test, could be used when measuring gastric emptying and intestinal transit within the same animal, and to ascertain whether the scientific outcome would be affected by this benefit to animal welfare. Rats and mice were fasted for 0, 3, 6 or 18 hours before the oral administration of vehicle or atropine. One hour later, the animals were orally administered a charcoal meal, then 20 minutes later, they were killed and the stomach and small intestine were removed. Intestinal transit time (the position of the charcoal front as a percentage of the total length of the small intestine) and relative gastric emptying (weight of stomach contents) were measured. Rats and mice fasted for six hours showed results for gastric emptying and intestinal transit which were similar to those obtained in animals fasted for 18 hours. Reducing the fasting period reduced the body weight loss in both species, and mice on shorter fasts could be group-housed, as hunger-induced fighting was lessened. Therefore, a fasting period of six hours was subsequently adopted for charcoal meal studies at our institution. 2011 FRAME.

  17. 3D Bioprinting of Carboxymethylated-Periodate Oxidized Nanocellulose Constructs for Wound Dressing Applications.

    Science.gov (United States)

    Rees, Adam; Powell, Lydia C; Chinga-Carrasco, Gary; Gethin, David T; Syverud, Kristin; Hill, Katja E; Thomas, David W

    2015-01-01

    Nanocellulose has a variety of advantages, which make the material most suitable for use in biomedical devices such as wound dressings. The material is strong, allows for production of transparent films, provides a moist wound healing environment, and can form elastic gels with bioresponsive characteristics. In this study, we explore the application of nanocellulose as a bioink for modifying film surfaces by a bioprinting process. Two different nanocelluloses were used, prepared with TEMPO mediated oxidation and a combination of carboxymethylation and periodate oxidation. The combination of carboxymethylation and periodate oxidation produced a homogeneous material with short nanofibrils, having widths material with good rheological properties for use as a bioink. The nanocellulose bioink was thus used for printing 3D porous structures, which is exemplified in this study. We also demonstrated that both nanocelluloses did not support bacterial growth, which is an interesting property of these novel materials.

  18. 3D Bioprinting of Carboxymethylated-Periodate Oxidized Nanocellulose Constructs for Wound Dressing Applications

    Directory of Open Access Journals (Sweden)

    Adam Rees

    2015-01-01

    Full Text Available Nanocellulose has a variety of advantages, which make the material most suitable for use in biomedical devices such as wound dressings. The material is strong, allows for production of transparent films, provides a moist wound healing environment, and can form elastic gels with bioresponsive characteristics. In this study, we explore the application of nanocellulose as a bioink for modifying film surfaces by a bioprinting process. Two different nanocelluloses were used, prepared with TEMPO mediated oxidation and a combination of carboxymethylation and periodate oxidation. The combination of carboxymethylation and periodate oxidation produced a homogeneous material with short nanofibrils, having widths <20 nm and lengths <200 nm. The small dimensions of the nanofibrils reduced the viscosity of the nanocellulose, thus yielding a material with good rheological properties for use as a bioink. The nanocellulose bioink was thus used for printing 3D porous structures, which is exemplified in this study. We also demonstrated that both nanocelluloses did not support bacterial growth, which is an interesting property of these novel materials.

  19. Development of a power-assisted lifting device for construction and periodic inspection

    International Nuclear Information System (INIS)

    Hayatsu, M.; Yamada, M.; Takasu, H.; Tagawa, Y.; Kajiwara, K.

    2001-01-01

    This study focuses on the control system design and control performance of a power-assisted lifting device. The device consists of several electric chain-blocks, each controlled by force sensors and a CPU. The mechanism is as follows: (1) Force sensors detect any chain tension changes (by human force), (2) The CPU calculates the required output, (3) Electric chain-blocks move the object in the intended direction. The feature of this device is that it does not require any information related to the suspension points of the electric chain-blocks. The controller was designed using the H method, which considers disturbances and aims to provide robust stability under the operation conditions of construction verified through experiments using a 700 kg steel dummy mass (control object) suspended by four electric chain-blocks. In the experiments, the controller, which was designed using the H method, was compared to the PI controller method, and the effectiveness of the H controller was proven. A control object could be moved, translated, and rotated by human force (of less than 10 kg). Positioning performance errors were suppressed to less than 0.5 mm, and operation time was reduced by about 50%. This device will improve working efficiency and rationalize lifting operations in nuclear power plants. (author)

  20. Development of a power-assisted lifting device for construction and periodic inspection

    Energy Technology Data Exchange (ETDEWEB)

    Hayatsu, M.; Yamada, M.; Takasu, H. [Hitachi Plant Engineering and Construction, Chiba-ken (Japan); Tagawa, Y. [Tokyo Univ. of Agriculture and Technology (Japan); Kajiwara, K. [National Research Institute for Earth Science and Disaster Prevention, Tokyo (Japan)

    2001-07-01

    This study focuses on the control system design and control performance of a power-assisted lifting device. The device consists of several electric chain-blocks, each controlled by force sensors and a CPU. The mechanism is as follows: (1) Force sensors detect any chain tension changes (by human force), (2) The CPU calculates the required output, (3) Electric chain-blocks move the object in the intended direction. The feature of this device is that it does not require any information related to the suspension points of the electric chain-blocks. The controller was designed using the H method, which considers disturbances and aims to provide robust stability under the operation conditions of construction verified through experiments using a 700 kg steel dummy mass (control object) suspended by four electric chain-blocks. In the experiments, the controller, which was designed using the H method, was compared to the PI controller method, and the effectiveness of the H controller was proven. A control object could be moved, translated, and rotated by human force (of less than 10 kg). Positioning performance errors were suppressed to less than 0.5 mm, and operation time was reduced by about 50%. This device will improve working efficiency and rationalize lifting operations in nuclear power plants. (author)

  1. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-01-01

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups

  2. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    Energy Technology Data Exchange (ETDEWEB)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-11-26

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups.

  3. Role of dissimilatory sulfate reduction in wetlands constructed for acid coal mine drainage (AMD) treatment. Master's thesis

    International Nuclear Information System (INIS)

    Taddeo, F.J.

    1991-01-01

    Five constructed wetlands with different organic substrates were exposed to the same quantity/quality of acid mine drainage (AMD). During the 16-month exposure to AMD, all wetlands accumulated S in the forms of organic and reduced inorganic S and Fe in the form of iron sulfides. Iron sulfide and probably most of the organic S(C-bonded S) accumulation were end products of bacterial dissimilatory sulfate reduction. Results of study support the notion that sulfate reduction and accumulation of Fe sulfides contribute to Fe retention in wetlands exposed to AMD. Detailed information is provided

  4. Construction and properties of a topological index for periodically driven time-reversal invariant 2D crystals

    Directory of Open Access Journals (Sweden)

    D. Carpentier

    2015-07-01

    Full Text Available We present mathematical details of the construction of a topological invariant for periodically driven two-dimensional lattice systems with time-reversal symmetry and quasienergy gaps, which was proposed recently by some of us. The invariant is represented by a gap-dependent Z2-valued index that is simply related to the Kane–Mele invariants of quasienergy bands but contains an extra information. As a byproduct, we prove new expressions for the two-dimensional Kane–Mele invariant relating the latter to Wess–Zumino amplitudes and the boundary gauge anomaly.

  5. Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs

    Directory of Open Access Journals (Sweden)

    Jing-chun Feng

    2012-09-01

    Full Text Available According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably.

  6. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models

  7. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models.

  8. Application of Updated Construction and Demolition Waste Reduction Policy to Army Projects

    Science.gov (United States)

    2015-12-01

    recovering materials for reuse and recycling from demolition, new construction, and renovation and repurposing projects. In its efforts to improve the...Building contents; reuse and recycling potential (including the follow- ing specific materials, products and components that are potentially re- usable...conventional demolition. Implement deconstruction wherever markets or on-site reuse opportunities exist or are anticipated.  Page 24, 3-7 REDUCE

  9. New-construction techniques and HVAC overpressurization for radon reduction in schools

    International Nuclear Information System (INIS)

    Saum, D.; Witter, K.A.; Craig, A.B.

    1988-01-01

    Construction of a school in Fairfax County, Virginia, is being carefully monitored since elevated indoor radon levels have been identified in many existing houses near the site. Soil gas radon concentrations measured prior to pouring of the slabs were also indicative of a potential radon problem should the soil gas enter the school; however, subslab radon measurements collected thus far are lower than anticipated. Radon-resistant features have been incorporated into construction of the school and include the placing of at least 100 mm of clean coarse aggregate under the slab and a plastic film barrier between the aggregate and the slab, the sealing of all expansion joints, the sealing or plugging of all utility penetrations where possible, and the painting of interior block walls. In addition, the school's heating, ventilating, and air-conditioning (HVAC) system has been designed to operate continuously in overpressurization to help reduce pressure-driven entry of radon-containing soil gas into the building. Following completion, indoor radon levels in the school will be monitored to determine the effectiveness of these radon-resistant new-construction techniques and HVAC overpressurization in limiting radon entry into the school

  10. Efficacy of enhanced HIV counseling for risk reduction during pregnancy and in the postpartum period: a randomized controlled trial.

    Directory of Open Access Journals (Sweden)

    Suzanne Maman

    Full Text Available Pregnancy and the postpartum period present important intervention opportunities. Counseling can leverage the motivation women have during this time to change behaviors that may negatively affect their health and the heath of their infants.Pregnant women attending an antenatal clinic in South Africa were randomly allocated to treatment (n=733 and control arms (n=747. Treatment arm participants received enhanced HIV pre- and post-test counseling, legal support and access to support groups at baseline, which occurred at the first antenatal visit, and then six and ten weeks postpartum. Control arm participants received standard HIV testing and counseling (HTC and two postpartum attention control sessions. Outcomes were incidence of sexually transmitted infection (STI by 14 weeks postpartum and past 30-day inconsistent condom use at 14 weeks and 9 months postpartum.There were no intervention effects on incident STIs for either HIV-negative (adjusted risk ratio (aRR 1.01, 95% CI 0.71-1.44 or HIV-positive participants (aRR 0.86, 95% CI 0.61-1.23. The intervention was associated with a 28% decrease in risk of past 30-day inconsistent condom use at nine-months among HIV-negative women (aRR 0.72,95% CI 0.59-0.88, but did not affect inconsistent condom use among HIV-positive women (aRR1.08; 95% CI 0.67-1.75.An enhanced counseling intervention during pregnancy and the postpartum period can lead to reductions in inconsistent condom use among HIV-negative women. Results underscore the importance of the counseling that accompanies HIV HTC. More work is needed to understand how to promote and sustain risk reduction among HIV-positive women.ClinicalTrials.gov NCT01683461.

  11. Reduction by invariants and projection of linear representations of Lie algebras applied to the construction of nonlinear realizations

    Science.gov (United States)

    Campoamor-Stursberg, R.

    2018-03-01

    A procedure for the construction of nonlinear realizations of Lie algebras in the context of Vessiot-Guldberg-Lie algebras of first-order systems of ordinary differential equations (ODEs) is proposed. The method is based on the reduction of invariants and projection of lowest-dimensional (irreducible) representations of Lie algebras. Applications to the description of parameterized first-order systems of ODEs related by contraction of Lie algebras are given. In particular, the kinematical Lie algebras in (2 + 1)- and (3 + 1)-dimensions are realized simultaneously as Vessiot-Guldberg-Lie algebras of parameterized nonlinear systems in R3 and R4, respectively.

  12. Constructing post-carbon institutions: Assessing EU carbon reduction efforts through an institutional risk governance approach

    International Nuclear Information System (INIS)

    LaBelle, Michael

    2012-01-01

    This paper examines three different governance approaches the European Union (EU) and Member States (MS) are relying on to reach a low carbon economy by 2050. Current governance literature explains the operational methods of the EU's new governance approach to reduce carbon emissions. However, the literature neglects to account for the perceived risks that inhibit the roll-out of new low carbon technology. This article, through a novel approach, uses a grounded theoretical framework to reframe traditional risk literature and provides a connection to governance literature in order to assess the ability of EU governance mechanisms to reduce carbon emissions. The empirical research is based on responses from European energy stakeholders who participated in a Delphi method discussion and in semi-structured interviews; these identified three essential requirements for carbon emissions to be reduced to near zero by 2050: (1) an integrated European energy network, (2) carbon pricing and (3) demand reduction. These features correspond to institutionalized responses by the EU and MS: the Agency for the Cooperation of Energy Regulators (ACER); European Union Emission Trading Scheme (EU ETS) and energy efficiency directives and policies integrated into existing MS institutions. The theoretical and empirical findings suggest that governance by facilitation (energy efficiency) fails to induce significant investment and new policy approaches and cannot be relied on to achieve requisite reductions in demand. Governance by negotiation (ACER) and governance by hierarchy (EU ETS) do reduce risks and may encourage the necessary technological uptake. The term ‘risk governance’ is used to explain the important role governance plays in reducing risks and advancing new technology and thereby lowering carbon emissions in the energy sector. - Highlights: ► This article assesses the role of EU institutions in reducing carbon emissions by 2050. ► Empirical research is based on Delphi

  13. Reduction in nitrogen oxide emissions by boiler construction companies in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R.

    1989-11-01

    Explains that in the USA greater emphasis is placed on reducing pollutant emissions by altering the combustion process than by cleaning flue gases. Results of a joint USA/FRG program show that NO{sub x} concentrations may vary greatly according to the type of slag removal (solid or liquid) and the location and type of burners used. Examines variants and demonstrates that the most effective method of reducing NO{sub x} emissions from large-scale pulverized-coal fired boilers is three-stage combustion used in conjunction with a flue gas cleaning method such as selective catalytic reduction (cyclone burners). Trials found that this method results in a 60% drop in NO{sub x} emissions and, if limestone is added to the tertiary air, a 20% drop in SO{sub 2}. Best results from an economic aspect were achieved when gas was burned in the extra burners. 6 refs.

  14. An Integrated Carbon Policy-Based Interactive Strategy for Carbon Reduction and Economic Development in a Construction Material Supply Chain

    Directory of Open Access Journals (Sweden)

    Liming Zhang

    2017-11-01

    Full Text Available Carbon emissions from the construction material industry have become of increasing concern due to increasingly urbanization and extensive infrastructure. Faced with serious atmospheric deterioration, governments have been seeking to reduce carbon emissions, with carbon trading and carbon taxes being considered the most effective regulatory policies. Over time, there has been a global consensus that integrated carbon trading/carbon tax policies are more effective in reducing carbon emissions. However, in an integrated carbon reduction policy framework, balancing the relationship between emission reductions and low-carbon benefits has been found to be a critical issue for governments and enterprises in both theoretical research and carbon emission reduction practices. As few papers have sought to address these issues, this paper seeks to reach a trade-off between economic development and environmental protection involving various stakeholders: regional governments which aim to maximize social benefits, and producers who seek economic profit maximization. An iterative interactive algorithmic method with fuzzy random variables (FRVs is proposed to determine the satisfactory equilibrium between these decision-makers. This methodology is then applied to a real-world case to demonstrate its practicality and efficiency.

  15. [Impact of maternal HIV status on family constructions and the infant's relational environment during the perinatal period].

    Science.gov (United States)

    Trocmé, N; Courcoux, M-F; Tabone, M-D; Leverger, G; Dollfus, C

    2013-01-01

    To assess whether maternal HIV-positive status negatively affects family construction and the child's psychological environment. Could this be responsible for behavioral problems observed in children infected with or affected by HIV? Interviews were conducted with 60 HIV+ mothers and their infants during the perinatal period, within 3 months of delivery, collected at the time of a pediatric outpatient visit within a PMTCT program. Half of the 60 mothers did not live with the infant's father, 56% of multiparous mothers were separated from their previous children. Sixty-five percent of the fathers were informed of the mother's HIV-positive status, although 90% of fathers who lived with the mothers were informed. During pregnancy, 80% of mothers reported psychological stress; after delivery, 72% of mothers suffered from not being allowed to breastfeed their infants, 43.5% expressed a fear of transmitting the infection to the child, and 40% avoided contacts with the infant. The impact of the mother's psychological stress and anxiety related to the risk of HIV transmission through breastfeeding and casual contacts were already noticeable in the first mother-child interrelations. Although the risk of MTC transmission in now very small, psychological troubles related to maternal HIV status may negatively affect the children's well-being and behavior, psychological support should be provided for mothers and children as part of comprehensive services. Copyright © 2012 Elsevier Masson SAS. All rights reserved.

  16. A journey to zero: reduction of post-operative cesarean surgical site infections over a five-year period.

    Science.gov (United States)

    Hickson, Evelyn; Harris, Jeanette; Brett, David

    2015-04-01

    Surgical site infections (SSI) are a substantial concern for cesarean deliveries in which a surgical site complication is most unwelcome for a mother with a new infant. Steps taken pre- and post-operatively to reduce the number of complications may be of substantial benefit clinically, economically, and psychologically. A risk-based approach to incision management was developed and implemented for all cesarean deliveries at our institution. A number of incremental interventions for low-risk and high-risk patients including pre-operative skin preparations, standardized pre- and post-operative protocols, post-operative nanocrystalline silver anti-microbial barrier dressings, and incisional negative pressure wound therapy (NPWT) were implemented sequentially over a 5-y period. A systematic clinical chart review of 4,942 patients spanning all cesarean deliveries between 2007-2012 was performed to determine what effects the interventions had on the rate of SSI for cesarean deliveries. The percentage of SSI was reduced from 2.13% (2007) to 0.10% (2012) (poperative SSIs were avoided: A total cost saving of nearly $5,000,000. Applying a clinical algorithm for assessing the risk of surgical site complication and making recommendations on pre-operative and post-operative incision management can result in a substantial and sustainable reduction in cesarean SSI.

  17. Construction of multilayers of bare and Pd modified gold nanoclusters and their electrocatalytic properties for oxygen reduction

    Directory of Open Access Journals (Sweden)

    Motoko Harada, Hidenori Noguchi, Nikolas Zanetakis, Satoru Takakusagi, Wenbo Song and Kohei Uosaki

    2011-01-01

    Full Text Available Multilayers of gold nanoclusters (GNCs coated with a thin Pd layer were constructed using GNCs modified with self-assembled monolayers (SAMs of mercaptoundecanoic acid and a polyallylamine hydrochloride (PAH multilayer assembly, which has been reported to act as a three-dimensional electrode. SAMs were removed from GNCs by electrochemical anodic decomposition and then a small amount of Pd was electrochemically deposited on the GNCs. The kinetics of the oxygen reduction reaction (ORR on the Pd modified GNC/PAH multilayer assembly was studied using a rotating disk electrode, and a significant increase in the ORR rate was observed after Pd deposition. Electrocatalytic activities in alkaline and acidic solutions were compared both for the GNC multilayer electrode and Pd modified GNC electrode.

  18. From Periodic Properties to a Periodic Table Arrangement

    Science.gov (United States)

    Besalú, Emili

    2013-01-01

    A periodic table is constructed from the consideration of periodic properties and the application of the principal components analysis technique. This procedure is useful for objects classification and data reduction and has been used in the field of chemistry for many applications, such as lanthanides, molecules, or conformers classification.…

  19. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    Science.gov (United States)

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  20. Reduction of bacteria and somatic coliphages in constructed wetlands for the treatment of combined sewer overflow (retention soil filters).

    Science.gov (United States)

    Ruppelt, Jan P; Tondera, Katharina; Schreiber, Christiane; Kistemann, Thomas; Pinnekamp, Johannes

    2018-05-01

    Combined sewer overflows (CSOs) introduce numerous pathogens from fecal contamination, such as bacteria and viruses, into surface waters, thus endangering human health. In Germany, retention soil filters (RSFs) treat CSOs at sensitive discharge points and can contribute to reducing these hygienically relevant microorganisms. In this study, we evaluated the extent of how dry period, series connection and filter layer thickness influence the reduction efficiency of RSFs for Escherichia coli (E. coli), intestinal enterococci (I. E.) and somatic coliphages. To accomplish this, we had four pilot scale RSFs built on a test field at the wastewater treatment plant Aachen-Soers. While two filters were replicates, the other two filters were installed in a series connection. Moreover, one filter had a thinner filtration layer than the other three. Between April 2015 and December 2016, the RSFs were loaded in 37 trials with pre-conditioned CSO after dry periods ranging from 4 to 40 days. During 17 trials, samples for microbial analysis were taken and analyzed. The series connection of two filters showed that the removal increases when two systems with a filter layer of the same height are operated in series. Since the microorganisms are exposed twice to the environmental conditions on the filter surface and in the upper filter layers, there is a greater chance for abiotic adsorption increase. The same effect could be shown when filters with different depths were compared: the removal efficiency increases as filter thickness increases. This study provides new evidence that regardless of seasonal effects and dry period, RSFs can improve hygienic situation significantly. Copyright © 2018 Elsevier GmbH. All rights reserved.

  1. The “green wave” mode production on the two-lane highways during the construction works time period

    Directory of Open Access Journals (Sweden)

    А. Berezhnoy

    2007-12-01

    Full Text Available In the paper, the problem of a bi-directional “green wave” mode production is considered for the vehicle flows motion on two-lane highways during the conducting of construction works. The solution of the given task allows to develop practical recommendations for the sphere of the construction works management on two-lane roads and country highways, and also to raise traffic control efficiency in the pointed conditions. The comparative analysis of possible traffic regulation modes for the set scheme of road construction works sites and the estimation of their effi ciency is performed, the test of a hypothesis regarding the possibility of a bi-directional “green wave” mode realization is carried out, and calculation of traffic lights signal control phases time is performed.

  2. Cost-Effectiveness Analysis of Surface Flow Constructed Wetlands (SFCW) for Nutrient Reduction in Drainage Discharge from Agricultural Fields in Denmark.

    Science.gov (United States)

    Gachango, F G; Pedersen, S M; Kjaergaard, C

    2015-12-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.

  3. Analytical and numerical construction of vertical periodic orbits about triangular libration points based on polynomial expansion relations among directions

    Science.gov (United States)

    Qian, Ying-Jing; Yang, Xiao-Dong; Zhai, Guan-Qiao; Zhang, Wei

    2017-08-01

    Innovated by the nonlinear modes concept in the vibrational dynamics, the vertical periodic orbits around the triangular libration points are revisited for the Circular Restricted Three-body Problem. The ζ -component motion is treated as the dominant motion and the ξ and η -component motions are treated as the slave motions. The slave motions are in nature related to the dominant motion through the approximate nonlinear polynomial expansions with respect to the ζ -position and ζ -velocity during the one of the periodic orbital motions. By employing the relations among the three directions, the three-dimensional system can be transferred into one-dimensional problem. Then the approximate three-dimensional vertical periodic solution can be analytically obtained by solving the dominant motion only on ζ -direction. To demonstrate the effectiveness of the proposed method, an accuracy study was carried out to validate the polynomial expansion (PE) method. As one of the applications, the invariant nonlinear relations in polynomial expansion form are used as constraints to obtain numerical solutions by differential correction. The nonlinear relations among the directions provide an alternative point of view to explore the overall dynamics of periodic orbits around libration points with general rules.

  4. Cost-effectiveness analysis of surface flow constructed wetlands (SFCW) for nutrient reduction in drainage discharge from agricultural fields in Denmark

    DEFF Research Database (Denmark)

    Gachango, Florence Gathoni; Pedersen, Søren Marcus; Kjærgaard, Charlotte

    2015-01-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies......, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients...... reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW...

  5. Micropole Undulators In Synchrotron Radiation Technology: Design And Construction Of A Submillimeter Period Prototype With A 3 Kilogauss Peak Field At SSRL

    Science.gov (United States)

    Tatchyn, Roman; Csonka, Paul

    1986-01-01

    The availability of undulators with submillimeter periods will profoundly affect the future development of soft x-ray sources and their attendant instrumentation. Outputs comparable to those of present-day conventional undulators, obtainable with much lower energy storage rings, is only one promising aspect of such devices. This paper critically examines some of the future prospects of such devices and describes the design and practical construction of a 1" long prototype consisting of 35 periods. A proposed experiment to test this device on a linac is described.

  6. Micropole undulators in synchrotron radiation technology: Design and construction of a submillimeter period prototype with a 3 kilogauss peak field at SSRL

    International Nuclear Information System (INIS)

    Tatchyn, R.; Csonka, P.

    1987-01-01

    The availability of undulators with submillimeter periods profoundly affects the future development of soft x-ray sources and their attendant instrumentation. Outputs comparable to those of present-day conventional undulators, obtainable with much lower energy storage rings, is only one promising aspect of such devices. This paper critically examines some of the future prospects of such devices and describes the design and practical construction of a 1'' long prototype consisting of 35 periods. A proposed experiment to test this device on a linac is described

  7. A projection-based model reduction strategy for the wave and vibration analysis of rotating periodic structures

    Science.gov (United States)

    Beli, D.; Mencik, J.-M.; Silva, P. B.; Arruda, J. R. F.

    2018-05-01

    The wave finite element method has proved to be an efficient and accurate numerical tool to perform the free and forced vibration analysis of linear reciprocal periodic structures, i.e. those conforming to symmetrical wave fields. In this paper, its use is extended to the analysis of rotating periodic structures, which, due to the gyroscopic effect, exhibit asymmetric wave propagation. A projection-based strategy which uses reduced symplectic wave basis is employed, which provides a well-conditioned eigenproblem for computing waves in rotating periodic structures. The proposed formulation is applied to the free and forced response analysis of homogeneous, multi-layered and phononic ring structures. In all test cases, the following features are highlighted: well-conditioned dispersion diagrams, good accuracy, and low computational time. The proposed strategy is particularly convenient in the simulation of rotating structures when parametric analysis for several rotational speeds is usually required, e.g. for calculating Campbell diagrams. This provides an efficient and flexible framework for the analysis of rotordynamic problems.

  8. Study of building typology of school constructed during the Dutch Colonial Period in Indonesia. Case study of Hoogere Burgerschool (HBS) in Bandung

    Science.gov (United States)

    Sarwo Wibowo, Arif

    2018-03-01

    Bandung is one of the most important colonial cities in Indonesia. In the early 20th century the capital city of Dutch East-Indies Government planned to move in Bandung. Critical infrastructures were intensively built during that period, such as streets and railways, houses, governmental buildings, train stations, hospitals and educational facilities. Besides the famous campus of Technische Hoogeschool te Bandoeng (ITB), still in the same period, several schools were also constructed. One of the most important schools was Hoogere Burgerschool in Bandung (HBS Bandung), now SMUN 3 and 5, Bandung designed by Charles Prosper Wolff Schoemaker and constructed in 1915. HBS Bandung was the fourth HBS constructed by Dutch East Indies Government, therefore became important and put itself as a reference for the later school buildings in Bandung. This study is analyzing how the architects’ frame of mind in producing this design works. Survey and direct data collecting were used to take the exact embodiment of building design. Usage and functional analysis were also used to match space and other standard used in a school building at that time. This study will give an understanding of building typology of school during the Dutch Colonial Period in Indonesia.

  9. Programme for construction and reconstruction of electro energetic objects in the Republic of Macedonia in the period 1996-2005

    International Nuclear Information System (INIS)

    1996-01-01

    The programme is prepared by Macedonian Ministry of Economy, as well as Ministry of Development, Ministry of Finance, Chamber of Commerce of Macedonia and Electric Power Co. of Macedonia. The aim of programme is to perceive electric power needs in the period 1996-2005 , to propose electro energetic objects that have to be built in order to satisfy electric power needs, as well as to present both necessary finances and possible sources for finances providing

  10. Comparison of exclusion and imidacloprid for reduction of oviposition damage to young trees by periodical cicadas (Hemiptera: Cicadidae).

    Science.gov (United States)

    Ahern, Robert G; Frank, Steven D; Raupp, Michael J

    2005-12-01

    Insecticides are traditionally used to control periodical cicadas (Homoptera: Cicadidae) and to reduce associated injury caused by oviposition. However, research has shown that conventional insecticides have low or variable season-long efficacy in reducing injury caused by cicadas. New systemic neonicotinoid insecticides provide excellent levels of control against a variety of sucking insects. We compared the efficacy of a neonicotinoid insecticide, imidacloprid, and a nonchemical control measure, netting, to reduce cicada injury. Netted trees sustained very little injury, whereas unprotected trees were heavily damaged. Fewer eggnests, scars, and flags were observed on trees treated with imidacloprid compared with unprotected trees; however, the hatching of cicada eggs was unaffected by imidacloprid.

  11. Construction of a surface air temperature series for Qingdao in China for the period 1899 to 2014

    Science.gov (United States)

    Li, Yan; Tinz, Birger; von Storch, Hans; Wang, Qingyuan; Zhou, Qingliang; Zhu, Yani

    2018-03-01

    We present a homogenized surface air temperature (SAT) time series at 2 m height for the city of Qingdao in China from 1899 to 2014. This series is derived from three data sources: newly digitized and homogenized observations of the German National Meteorological Service from 1899 to 1913, homogenized observation data of the China Meteorological Administration (CMA) from 1961 to 2014 and a gridded dataset of Willmott and Matsuura (2012) in Delaware to fill the gap from 1914 to 1960. Based on this new series, long-term trends are described. The SAT in Qingdao has a significant warming trend of 0.11 ± 0.03 °C decade-1 during 1899-2014. The coldest period occurred during 1909-1918 and the warmest period occurred during 1999-2008. For the seasonal mean SAT, the most significant warming can be found in spring, followed by winter. The homogenized time series of Qingdao is provided and archived by the Deutscher Wetterdienst (DWD) web page under overseas stations of the Deutsche Seewarte (http://www.dwd.de/EN/ourservices/overseas_stations/ueberseedoku/doi_qingdao.html) in ASCII format. Users can also freely obtain a short description of the data at https://doi.org/https://dx.doi.org/10.5676/DWD/Qing_v1" target="_blank">https://doi.org/https://dx.doi.org/10.5676/DWD/Qing_v1. And the data can be downloaded at http://dwd.de/EN/ourservices/overseas_stations/ueberseedoku/data_qingdao.txt.

  12. Engineered barrier construction in salt rock. Final report of project phase 2. Period covered: 1 July 1989 - 31 December 1992

    International Nuclear Information System (INIS)

    Stockmann, N.; Beinlich, A.; Droste, J.; Flach, D.; Glaess, F.; Jockwer, N.; Krogmann, P.; Miehe, R.; Moeller, J.; Schwaegermann, F.; Wallmueller, R.; Walter, F.; Yaramanci, U.

    1994-01-01

    The project report presents and explains data obtained by a specific measuring programme, giving evidence of the sealing efficiency of an engineered barrier comprising abutment, long-term barrier, and hydraulic short-term barrier, the sealing performance having been verified for shorter and longer periods of time ( up to approx. 500 years). Specific computer codes have been applied for computing and verifying the long-term efficiency of the complex engineered barrier system (artificial structures and surrounding rock). The technical feasibility and the performance of an engineered barrier for reliable sealing of a radwaste repository is thus demonstrated at a scale of 1:1 at the site of the Asse mine [de

  13. Socio-Economic Problems of the Russian Construction of Art Nouveau Period (on the Example of A.I. Lishnevsky’s Activity

    Directory of Open Access Journals (Sweden)

    Aleksandr I. Chepel

    2017-09-01

    Full Text Available The author studies the specifics of Russian architect’s work on the example of the activity of prominent architect of Art Nouveau period A.L. Lishnevsky (1868–1942. The special attention is paid to the architect’s relations with the authorities, contractors and workers, as well as with customers and colleagues. The author shows the opinion of citizens about the activities of an architect as a builder and businessman, reveals the main socio-economic problems which the architect faced from the moment of inception and approval of the project prior to its actual implementation. The author attempts to trace the mechanism of professional networking in the architecture environment of that time, and to reveal the peculiarities of private architectural bureaus (“offices”. The attention is paid to the assessment by the architect of their own professional activity. A.L. Lishnevsky’s activity is a good example of architect’s work in the construction business. A native of the city of Kherson, he received the metropolitan education at the Art Academy, then for over six years (1895–1901 he worked as a municipal architect in Elisavetgrad (Kirovograd, since 2016 – Kropivnytsky during the period of rapid economic and cultural growth of the town. After 1901 and up to 1917 he was actively engaged in municipal and private construction in the capital of the Russian Empire, Saint Petersburg. The relevance of the topic is determined by the fact that the Art Nouveau period architect worked in capitalism construction market, and was forced to deal with issues similar to those that the architects of our time solve. The study is based on materials from Russian archives and periodicals of late 19th – early 20th century.

  14. [Has application of the decree banning the use of cement with a high chromium VI content led to a reduction in occupational cement dermatitis in salaried workers in the construction industries?].

    Science.gov (United States)

    Halioua, Bruno; Bensefa-Colas, Lynda; Crepy, Marie-Noëlle; Bouquiaux, Barbara; Assier, Haudrey; Billon, Stéphane; Chosidow, Olivier

    2013-03-01

    Active employees in the construction industry are particularly exposed to occupational cement eczema (OCE) which affects the hands in 80 to 90% of cases. The importance of OCE in France and the impact of the application of decree n(o). 2005-577 on 26 May 2005 were estimated from data collected by the Occupational risks division of the French national health insurance fund for salaried workers (CNAMTS). This decree prohibits the placing on the market and use of cement (and preparations containing it) with a chromium VI content above 0.0002% in order to reduce its hazardousness. All cases of OCE reported to and recognized by the CNAMTS between 1 January 2004 and 31 December 2008 among construction workers were selected. The following parameters were noted in each case: age, gender, industrial sector concerned, local French National health insurance agency, causal agent and the number of working days lost. The incidence per 100,000 salaried workers could be determined from the total number of salaried workers followed up by occupational medicine as well as those working in the construction industry. For the five years studied, 3698 cases of occupational eczema (OE) were reported in construction workers and this was 17.1% of the total number of cases of OE for all salaried employees (n=12.689). Cement was the causal agent most frequently involved in the construction sector (57.8%, 2139/3698). The annual incidence of OCE decreased from 37.8 to 21.1 new cases per 100,000 employees in the construction industry per year between 2004 and 2008. The total number of days lost from work due to OCE decreased by 39% during the study period. This descriptive study highlights the importance and socio-economic impact of OCE in the construction industry. Application of decree n(o). 2005-577 on 26 May 2005 may explain a reduction in OCE. Copyright © 2012. Published by Elsevier Masson SAS.

  15. Abnormal arrangement of a collagen/apatite extracellular matrix orthogonal to osteoblast alignment is constructed by a nanoscale periodic surface structure.

    Science.gov (United States)

    Matsugaki, Aira; Aramoto, Gento; Ninomiya, Takafumi; Sawada, Hiroshi; Hata, Satoshi; Nakano, Takayoshi

    2015-01-01

    Morphological and directional alteration of cells is essential for structurally appropriate construction of tissues and organs. In particular, osteoblast alignment is crucial for the realization of anisotropic bone tissue microstructure. In this article, the orientation of a collagen/apatite extracellular matrix (ECM) was established by controlling osteoblast alignment using a surface geometry with nanometer-sized periodicity induced by laser ablation. Laser irradiation induced self-organized periodic structures (laser-induced periodic surface structures; LIPSS) with a spatial period equal to the wavelength of the incident laser on the surface of biomedical alloys of Ti-6Al-4V and Co-Cr-Mo. Osteoblast orientation was successfully induced parallel to the grating structure. Notably, both the fibrous orientation of the secreted collagen matrix and the c-axis of the produced apatite crystals were orientated orthogonal to the cell direction. To the best of our knowledge, this is the first report demonstrating that bone tissue anisotropy is controllable, including the characteristic organization of a collagen/apatite composite orthogonal to the osteoblast orientation, by controlling the cell alignment using periodic surface geometry. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. Fluvial geomorphology and suspended-sediment transport during construction of the Roanoke River Flood Reduction Project in Roanoke, Virginia, 2005–2012

    Science.gov (United States)

    Jastram, John D.; Krstolic, Jennifer L.; Moyer, Douglas; Hyer, Kenneth

    2015-09-30

    Beginning in 2005, after decades of planning, the U.S. Army Corps of Engineers (USACE) undertook a major construction effort to reduce the effects of flooding on the city of Roanoke, Virginia—the Roanoke River Flood Reduction Project (RRFRP). Prompted by concerns about the potential for RRFRP construction-induced geomorphological instability and sediment liberation and the detrimental effects these responses could have on the endangered Roanoke logperch (Percina rex), the U.S. Geological Survey (USGS) partnered with the USACE to provide a real-time warning network and a long-term monitoring program to evaluate geomorphological change and sediment transport in the affected river reach. Geomorphological change and suspended-sediment transport are highly interdependent and cumulatively provide a detailed understanding of the sedimentary response, or lack thereof, of the Roanoke River to construction of the RRFRP.

  17. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  18. Transition Metal Oxides for the Oxygen Reduction Reaction: Influence of the Oxidation States of the Metal and its Position on the Periodic Table.

    Science.gov (United States)

    Toh, Rou Jun; Sofer, Zdeněk; Pumera, Martin

    2015-11-16

    Electrocatalysts have been developed to meet the needs and requirements of renewable energy applications. Metal oxides have been well explored and are promising for this purpose, however, many reports focus on only one or a few metal oxides at once. Herein, thirty metal oxides, which were either commercially available or synthesized by a simple and scalable method, were screened for comparison with regards to their electrocatalytic activity towards the oxygen reduction reaction (ORR). We show that although manganese, iron, cobalt, and nickel oxides generally displayed the ability to enhance the kinetics of oxygen reduction under alkaline conditions compared with bare glassy carbon, there is no significant correlation between the position of a metal on the periodic table and the electrocatalytic performance of its respective metal oxides. Moreover, it was also observed that mixed valent (+2, +3) oxides performed the poorest, compared with their respective pure metal oxides. These findings may be of paramount importance in the field of renewable energy. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  19. "Just Advil": Harm reduction and identity construction in the consumption of over-the-counter medication for chronic pain.

    Science.gov (United States)

    Eaves, Emery R

    2015-12-01

    Direct-to-consumer marketing has sparked ongoing debate concerning whether ads empower consumers to be agents of their own care or shift greater control to the pharmaceutical industry. Ads for over-the-counter (OTC) medications in particular portend to offer simple, harmless solutions for meeting the demands of social life. Rather than join the longstanding debate between consumer agency and social control in pharmaceutical advertising, I approach self-medication with over-the-counter (OTC) analgesics using Harm Reduction as a framework. From this perspective, consumption of OTC analgesics by chronic pain sufferers is a means of seeking some level of relief while also avoiding the stigma associated with prescription pain medication. Qualitative methods are used to analyze data from two sources: (1) semi-structured qualitative interviews with 95 participants in a trial examining the effectiveness of Traditional Chinese Medicine for Temporomandibular Disorders (TMD) from 2006 to 2011 in Tucson, AZ and Portland, OR; and (2) print, online, and television advertisements for three major brands of OTC pain medication. Participants described their use of OTC medications as minimal, responsible, and justified by the severity of their pain. OTC medication advertising, while ostensibly ambiguous and targeting all forms of pain, effectively lends support to the consumption of these medications as part of the self-projects of chronic pain sufferers, allowing them to reconcile conflicting demands for pain relief while being stoic and maintaining a positive moral identity. Describing OTC medication as "just over-the-counter" or "not real pain medication," sufferers engage in ideological harm reduction, distinguishing themselves from "those people who like taking pain medication" while still seeking relief. Justifying one's use of OTC medication as minimal and "normal," regardless of intake, avoids association with the addictive potential of prescription pain medications and

  20. Codes in the codons: construction of a codon/amino acid periodic table and a study of the nature of specific nucleic acid-protein interactions.

    Science.gov (United States)

    Benyo, B; Biro, J C; Benyo, Z

    2004-01-01

    The theory of "codon-amino acid coevolution" was first proposed by Woese in 1967. It suggests that there is a stereochemical matching - that is, affinity - between amino acids and certain of the base triplet sequences that code for those amino acids. We have constructed a common periodic table of codons and amino acids, where the nucleic acid table showed perfect axial symmetry for codons and the corresponding amino acid table also displayed periodicity regarding the biochemical properties (charge and hydrophobicity) of the 20 amino acids and the position of the stop signals. The table indicates that the middle (2/sup nd/) amino acid in the codon has a prominent role in determining some of the structural features of the amino acids. The possibility that physical contact between codons and amino acids might exist was tested on restriction enzymes. Many recognition site-like sequences were found in the coding sequences of these enzymes and as many as 73 examples of codon-amino acid co-location were observed in the 7 known 3D structures (December 2003) of endonuclease-nucleic acid complexes. These results indicate that the smallest possible units of specific nucleic acid-protein interaction are indeed the stereochemically compatible codons and amino acids.

  1. Periodic additive noises reduction in 3D images used in building of voxel phantoms through an efficient implementation of the 3D FFT: zipper artifacts filtering

    International Nuclear Information System (INIS)

    Oliveira, Alex C.H. de; Lima, Fernando R.A.; Vieira, Jose W.; Leal Neto, Viriato

    2009-01-01

    The anthropomorphic models used in computational dosimetry are predominantly build from scanning CT (Computed Tomography) or MRI (Magnetic Resonance Imaging) image stacks obtained of patients or volunteers. The building of these stacks (usually called of voxel phantoms or tomography phantoms) requires computer processing to be used in an exposure computational model. Noises present in these stacks can be confused with significant structures. In a 3D image with periodic additive noise in the frequency domain, the noise is fully added to its central slice. The discrete Fourier transform is the fundamental mathematical tool that allows the switch of the spatial domain for the frequency domain, and vice versa. The FFT (fast Fourier transform) algorithm is an ideal computational tool for this switch in domain with efficiency. This paper presents a new methodology for implementation in managed C++ language (Microsoft Visual Studio R .NET) of the fast Fourier transform of 3D digital images (FFT3D) using, essentially, the trigonometric recombination. The reduction of periodic additive noise consists in filtering only the central slice of 3D image in the frequency domain and transforms it back into the spatial domain through the inverse FFT3D. An example of application of this method it is the zipper artifacts filtering in images of MRI. These processes were implemented in the software DIP (Digital Image Processing). (author)

  2. Using one filter stage of unsaturated/saturated vertical flow filters for nitrogen removal and footprint reduction of constructed wetlands.

    Science.gov (United States)

    Morvannou, Ania; Troesch, Stéphane; Esser, Dirk; Forquet, Nicolas; Petitjean, Alain; Molle, Pascal

    2017-07-01

    French vertical flow constructed wetlands (VFCW) treating raw wastewater have been developed successfully over the last 30 years. Nevertheless, the two-stage VFCWs require a total filtration area of 2-2.5 m 2 /P.E. Therefore, implementing a one-stage system in which treatment performances reach standard requirements is of interest. Biho-Filter ® is one of the solutions developed in France by Epur Nature. Biho-Filter ® is a vertical flow system with an unsaturated layer at the top and a saturated layer at the bottom. The aim of this study was to assess this new configuration and to optimize its design and operating conditions. The hydraulic functioning and pollutant removal efficiency of three different Biho-Filter ® plants commissioned between 2011 and 2012 were studied. Outlet concentrations of the most efficient Biho-Filter ® configuration are 70 mg/L, 15 mg/L, 15 mg/L and 25 mg/L for chemical oxygen demand (COD), 5-day biological oxygen demand (BOD 5 ), total suspended solids (TSS) and total Kjeldahl nitrogen (TKN), respectively. Up to 60% of total nitrogen is removed. Nitrification efficiency is mainly influenced by the height of the unsaturated zone and the recirculation rate. The optimum recirculation rate was found to be 100%. Denitrification in the saturated zone works at best with an influent COD/NO 3 -N ratio at the inflet of this zone larger than 2 and a hydraulic retention time longer than 0.75 days.

  3. REDUCTION OF THE RISK IN PUBLIC PROCUREMENT BY USING DESIGN-BUILD AS A MEANS FOR SUITABLE CONSTRUCTING

    Directory of Open Access Journals (Sweden)

    Jakub Blaťák

    2016-07-01

    Full Text Available Suitable and sustainable buildings have increased demands for design and for the transfer of design requirements to realization. That causes an increase of risk connected with the differences between planned and real parameters of the buildings. This article will outline the main theme comparison between DBB and DB projects concerning contractor’s risk management level. This comparative analysis explains, using the RIPRAN method, the hidden risks in each type of delivery method. The comparison identifies numerous contractual topics and risks included in both and gives deeper insight into risk management, both for the contracting party and also for public procurement. Applying risk analysis strategies and tools to the process will help decision-makers evaluate and select the suitable delivery method consistently and defensibly. This paper gives generic risk factors related to both project types. The results indicate risk factors with influence on the price, probability of occurrence and unfavourable impact on the project and help allocate risk level more properly in accordance with its high, middle or low probable impact. Public investment is a significant part of the public budget, the application of design-build can help with the reduction of corruption, and the public sector can benefit from the usage of DB projects to help eliminate the mistakes made by contracting authorities.

  4. The layout of urban construction in Bolghar in the late Golden Horde period (preliminary results of studies on materials of excavations Southwest of the Cathedral Mosque

    Directory of Open Access Journals (Sweden)

    Badeev Denis Yu.

    2014-06-01

    Full Text Available The results of the archaeological studies on a monumental building, identified in the central part of the Bolghar fortified settlement site, 150 meters southwest of the Cathedral Mosque, during the 1989-1993, 2000 and 2011-2013 works are presented. Adobe brick masonry and remains of wooden flooring have been recorded. Findings in the form of numerous a large number of commercial stock-in-trade items and coins allow interpreting this building as the city market. The authors of the excavations of the building date it back to the 50-70s of the 14th century. The structural elements of the construction and its internal layout suggest the existence of the city market at the intersection of two streets. The presence of street system in this part of the city is also indicated by the remains of two brickworks of mud bricks, which had served as a street fence (duval and referred to layers of the 30-40s of the 14th century. In the mid-14th century, the building of the city market had been being erected in place of the street fence and the adjoining estates. Thus, the development dynamics of Bolghar urban planning in the Late Golden Horde period on the site southwest of the Cathedral Mosque could be traced.

  5. FORECASTING ENERGY CONSUMPTION IN SHORT-TERM AND LONG-TERM PERIOD BY USING ARIMAX MODEL IN THE CONSTRUCTION AND MATERIALS SECTOR IN THAILAND

    Directory of Open Access Journals (Sweden)

    Pruethsan Sutthichaimethee

    2017-07-01

    Full Text Available This study aims to analyze the forecasting of energy consumption in the Construction and Materials sectors. The scope of the study covers the forecasting periods of energy consumption for the next 10 years, 2017-2026, 20 years, 2017-2036, and 30 years, 2017-2046, by using ARIMAX Model. The prediction results show that these models are effective in the forecast measured by RMSE, MAE, and MAPE. The results show that from the first model (2,1,1, which predicted the duration of 10 years, 2017-2026, indicates that Thailand has increased an energy consumption rate with the average of 18.09%, while the second model (2,1,2 with the prediction of 20 years, 2017-2036, Thailand arises its energy consumption up to 37.32%. In addition, the third model (2,1,3 predicted the duration of 30 years from 2017 to 2046, and it has found that Thailand increases its energy consumption up to 49.72%.

  6. Comparison of the effectiveness in pain reduction and pulmonary function between a rib splint constructed in the ER and a manufactured rib splint.

    Science.gov (United States)

    Lee, Yoonje; Lee, Sang-Hyun; Kim, Changsun; Choi, Hyuk Joong

    2018-05-01

    In the treatment of patients with rib fractures (RFs), pain reduction is the most important consideration. Various studies have examined the effectiveness of treatments administered to RF patients, such as lidocaine patches, IV drugs, nerve blockers, and surgery. In this study, we evaluated the difference in the effectiveness in pain reduction between 2 groups of RF patients: 1 group who received a rib splint constructed in the ER (ER splint) and another group who received a Chrisofix Chest Orthosis (CCO) manufactured rib splint. A pilot study for a prospective randomized clinical trial was conducted to compare subjects using the CCO (Group A) with those using the ER splint (Group B) before and after the intervention. The primary outcome was difference in the level of pain based on the visual analogue scale (VAS) and the pulmonary function (PF) variables between before and after intervention in each group during forceful and resting respiration. A total of 24 subjects were enrolled in this study. The VAS results showed that the intervention was significantly effective in each group (before vs after: Group A resting: 8.50 ± 1.05 vs 4.17 ± 1.33, P pain, and no significant differences in pain level were observed between these 2 techniques.

  7. Rationalizing of construction engineering of nuclear power plants with pressurized water reactors

    International Nuclear Information System (INIS)

    Schmidt, S.

    1977-01-01

    Construction of large power plants requires further reduction of construction efforts and the construction period. A new constructional and technological solution has been developed with the steel-cell composite structure applied in the Greifswald nuclear power plant 'Bruno Leuschner' for the first time. Principles of design, fabrication, transport, and mounting are described. The benefits of the method are indicated. (author)

  8. Comparison of cost effectiveness of risk reduction among different energy systems: French case studies. Final report for the period 1 May 1982 - 20 February 1988

    Energy Technology Data Exchange (ETDEWEB)

    Lochard, J [CEPN Centre d` Etude sur l` Evaluation de la Protection dans le Domaine Nucleaire, Fontenay-Aux-Roses (France)

    1989-08-01

    The report presents the three French case studies performed in the framework of the co-ordinated research programme on ``Comparison of Cost-Effectiveness of Risk Reduction Among Different Energy Systems``: cost-effectiveness of robotics and remote tooling for occupational risk reduction at a nuclear fuel fabrication facility; cost-effectiveness of protection actions to reduce occupational exposure in underground uranium mines; cost effectiveness of safety measures to reduce public risk associated with the transportation of UF{sub 6} by truck and trains. Figs and tabs.

  9. Comparison of cost effectiveness of risk reduction among different energy systems: French case studies. Final report for the period 1 May 1982 - 20 February 1988

    International Nuclear Information System (INIS)

    Lochard, J.

    1989-08-01

    The report presents the three French case studies performed in the framework of the co-ordinated research programme on ''Comparison of Cost-Effectiveness of Risk Reduction Among Different Energy Systems'': cost-effectiveness of robotics and remote tooling for occupational risk reduction at a nuclear fuel fabrication facility; cost-effectiveness of protection actions to reduce occupational exposure in underground uranium mines; cost effectiveness of safety measures to reduce public risk associated with the transportation of UF 6 by truck and trains. Figs and tabs

  10. Enhancing the Process of Anaerobic Ammonium Oxidation Coupled to Iron Reduction in Constructed Wetland Mesocosms with Supplementation of Ferric Iron Hydroxides

    Science.gov (United States)

    Shuai, W.; Jaffe, P. R.

    2017-12-01

    Effective ammonium (NH4+) removal has been a challenge in wastewater treatment processes. Aeration, which is required for the conventional NH4+ removal approach by ammonium oxidizing bacteria, is an energy intensive process during the operation of wastewater treatment plant. The efficiency of NH4+ oxidation in natural systems is also limited by oxygen transfer in water and sediments. The objective of this study is to enhance NH4+ removal by applying a novel microbial process, anaerobic NH4+ oxidation coupled to iron (Fe) reduction (also known as Feammox), in constructed wetlands (CW). Our studies have shown that an Acidimicrobiaceae bacterium named A6 can carry out the Feammox process using ferric Fe (Fe(III)) minerals like ferrihydrite as their electron acceptor. To investigate the properties of the Feammox process in CW as well as the influence of electrodes, Feammox bacterium A6 was inoculated in planted CW mesocosms with electrodes installed at multiple depths. CW mesocosms were operated using high NH4+ nutrient solution as inflow under high or low sediment Fe(III) level. During the operation, NH4+ and ferrous Fe concentration, pore water pH, voltages between electrodes, oxidation reduction potential and dissolved oxygen were measured. At the end of the experiment, CW sediment samples at different depths were taken, DNAs were extracted and quantitative polymerase chain reaction and pyrosequencing were performed to analyze the microbial communities. The results show that the high Fe level CW mesocosm has much higher NH4+ removal ability than the low Fe level CW mesocosm after Fe-reducing conditions are developed. This indicates the enhanced NH4+ removal can be attributed to elevated Feammox activity in high Fe level CW mesocosm. The microbial community structures are different in high or low Fe level CW mesocosms and on or away from the installed electrodes. The voltages between cathode and anode increased after the injection of A6 enrichment culture in low Fe

  11. Activities of the TUV experts during the period of construction and commissioning of a nuclear power plant ordered by the licensing authorities of the FRG

    International Nuclear Information System (INIS)

    Dommke, J.; Fendler, H.

    1977-01-01

    The inspection organisations in the Federal Republic of Germany (Technische Uberwachungs-Vereine) are independent systems grouped on a regional basis. The competent licensing authorities of the various Lander consult them concerning assessments for site selection and the design, construction, commissioning and operation of nuclear power plants. Furthermore the TUV experts inspect the manufacture of components in the suppliers' facilities and on site. (NEA) [fr

  12. An unsaturated metal site-promoted approach to construct strongly coupled noble metal/HNb3O8 nanosheets for efficient thermo/photo-catalytic reduction.

    Science.gov (United States)

    Shen, Lijuan; Xia, Yuzhou; Lin, Sen; Liang, Shijing; Wu, Ling

    2017-10-05

    Creating two-dimensional (2D) crystal-metal heterostructures with an ultrathin thickness has spurred increasing research endeavors in catalysis because of its fascinating opportunities in tuning the electronic state at the surface and enhancing the chemical reactivity. Here we report a novel and facile Nb 4+ -assisted strategy for the in situ growth of highly dispersed Pd nanoparticles (NPs) on monolayer HNb 3 O 8 nanosheets (HNb 3 O 8 NS) constituting a 2D Pd/HNb 3 O 8 NS heterostructure composite without using extra reducing agents and stabilizing agents. The Pd NP formation is directed via a redox reaction between an oxidative Pd salt precursor (H 2 PdCl 4 ) and reductive unsaturated surface metal (Nb 4+ ) sites induced by light irradiation on monolayer HNb 3 O 8 NS. The periodic arrangement of metal Nb nodes on HNb 3 O 8 NS leads to a homogeneous distribution of Pd NPs. Density functional theory (DFT) calculations reveal that the direct redox reaction between the Nb 4+ and Pd 2+ ions leads to a strong chemical interaction between the formed Pd metal NPs and the monolayer HNb 3 O 8 support. Consequently, the as-obtained Pd/HNb 3 O 8 composite serves as a highly efficient bifunctional catalyst in both heterogeneous thermocatalytic and photocatalytic selective reduction of aromatic nitro compounds in water under ambient conditions. The achieved high activity originates from the unique 2D nanosheet configuration and in situ Pd incorporation, which leads to a large active surface area, strong metal-support interaction and enhanced charge transport capability. Moreover, this facile Nb 4+ -assisted synthetic route has demonstrated to be general, which can be applied to load other metals such as Au and Pt on monolayer HNb 3 O 8 NS. It is anticipated that this work can extend the facile preparation of noble metal/nanosheet 2D heterostructures, as well as promote the simultaneous capture of duple renewable thermal and photon energy sources to drive an energy efficient

  13. Ice storage facilities may use excess contingents of electricity. Reduction of the payback period by smart grids; Eisspeicher koennen ueberschuessige Stromkontingente nutzen. Amortisationszeit durch Smart Grid verkuerzen

    Energy Technology Data Exchange (ETDEWEB)

    Schulz, Klaus [Fafco S.A., Biel (Switzerland); Schmid, Wolfgang

    2013-03-11

    In Germany, energy storage device attain a great importance in the energy supply. However, up to now economical technologies are missing in order to store fluctuating offers of electricity from renewable energy sources directly in a storage medium. Within the modern refrigeration and air conditioning, ice storage facilities proved over decades could take up this position and could be one component of the energy policy turnaround. New tariff offers as well as the construction of virtual power plants let expect that ice storage facilities may amortize within few years.

  14. Los Alamos transuranic waste size reduction facility

    International Nuclear Information System (INIS)

    Briesmeister, A.; Harper, J.; Reich, B.; Warren, J.L.

    1982-01-01

    To facilitate disposal of transuranic (TRU) waste, Los Alamos National Laboratory designed and constructed the Size Reduction Facility (SRF) during the period 1977 to 1981. This report summarizes the engineering development, installation, and early test operations of the SRF. The facility incorporates a large stainless steel enclosure fitted with remote handling and cutting equipment to obtain an estimated 4:1 volume reduction of gloveboxes and other bulky metallic wastes

  15. Los Alamos transuranic waste size reduction facility

    International Nuclear Information System (INIS)

    Briesmeister, A.; Harper, J.; Reich, B.; Warren, J.L.

    1982-01-01

    A transuranic (TRU) Waste Size Reduction Facility (SRF) was designed and constructed at the Los Alamos National Laboratory during the period of 1977 to 1981. This paper summarizes the engineering development, installation, and early test operations of the SRF. The facility incorporates a large stainless steel enclosure fitted with remote handling and cutting equipment to obtain an estimated 4:1 volume reduction of gloveboxes and other bulky metallic wastes

  16. A Research of Construction Mechanism of Vassal State's City Group during Spring and Autumn Period Based on the Analyzation of Geographic Image - Take south region of Shandong as example

    Science.gov (United States)

    Gao, X.; Li, B.; Zhou, X.

    2015-08-01

    Spring and Autumn period, the vassal states began to carry out country defense construction actively, brought changes to building the ideological. At that time, the south region of Shandong, as an independent unit of geography, seldom affected by external factors, and had striking cultural characteristics. Vassal states there constructed their capital mainly to defense the neighboring countries and cope with small scale mergers war, not involving the nationwide military deployment. Therefore, the region reflect the construction thought changes during the Spring and Autumn Period, and consistent with the research purpose. Based on this judgment, the author analyzed each capital's location and terrain feature by topographic map. In brief, the Spring and Autumn Period, feudal states acted of one's own free will, the relationship between cities contained the one within and between vassal states. Within vassal state relationships included economic support, entrenching each other and protecting the country together. Meanwhile, strategic defensing, scrambling for resources and geographical location comprised of the competition between vassal states. In the agrarian age, the political centers and agricultural areas were interdependent, giving priority to the development of political cities. Transformation of capitals' space layout was actually the process of carving up farming plains, the powerful states occupy favorable geographical position, and the small countries would be encroached and annexed gradually.

  17. Design and construction of focusing lens to be applied to the XRF analysis. Final report for the period 1 December 1993 - 30 November 1995

    International Nuclear Information System (INIS)

    Yan Yiming

    1996-01-01

    The construction and performance test for assembled and monolithic lenses have been done. Experimental setups and procedures for the determination of focussing capability of the lenses (diameter of the X-ray beam), beam profile at the focal plane, and transmission efficiency were designed and provided the necessary data. The results of the test of both lenses (assembled and monolithic) are good. The fact that the monolithic lens is significantly better as far as the spot size and gain factor are concerned, proves the advantages of the new technology for production of focussing optics for XRF analysis. The spot size of X-ray microbeam (200 μm) is adequate for many applications of XRF technique for trace element determination with both advantageous detection limits and imaging capability

  18. THE CONSTRUCTION OF PHYSICAL REHABILITATION PROGRAMS IN THE PREOPERATIVE PERIOD FOR PATIENTS THAT WILL REMOVE OF INTERVERTEBRAL DISC’ PROLAPSE IN THE LUMBAR SPINE

    Directory of Open Access Journals (Sweden)

    E.B. Lazarieva

    2014-06-01

    Full Text Available The ineffectiveness of conservative treatment will make the need for surgery in 4-5% of patients suffering from low back pain with hernias of the lumbar and sacral spine. Despite the surgical removal of the source of compressed roots, nerves and blood vessels, require a comprehensive system of rehabilitation therapy in order to eliminate manifestations of disease and relief of disease progression. The aim of the work is to substantiate the general approaches for the using of physical rehabilitation and diagnostics static component of the dynamic stereotype in the preoperative period in patients to remove intervertebral disc prolapse. The materials and methods. There was examined 96 with low back pain. Methods are applied in this research: analysis of a literature, observation methods. Results. In conjunction with the physician was determined "diagnosis for rehabilitation" and "prognosis of the rehabilitation". The formulation of the basis of the diagnosis for rehabilitation was performed through the examination during the rehabilitation (as a taking an anamnestic data, examination and palpation, studies of intact sensory and motor functions, the results of objective research tool. Conclusions. The identification of preserved anatomical and functional entities, the definition of the initial level of compensation for lost functions and forecast further recovery is a fundamental approach to program development in the preoperative period in patients with low back pain aimed at the removal of intervertebral disc herniations.

  19. Reductive coupling of carbon monoxide to C{sub 2} products. Progress report for the period, May 1, 1990--November 15, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Templeton, J.L.

    1993-10-01

    This progress report covers the two broad areas of research addressed during the period since May 1, 1990. As proposed in 1989, studies of carbyne transformations have been pursued with a variety of carbyne substituents. Perhaps the most noteworthy carbyne results are also the simplest: preparation and properties of the parent M{triple_bond}CH unit. The other topic addressed with DOE support has metal nitrene chemistry as the cornerstone. Publications with iron, tungsten and copper complexes reflect our efforts to access intermediate oxidation state metal nitrene monomers. This new thrust was a central theme of the proposal submitted in 1989, and progress to date is sufficiently encouraging that detailed plans for expanding our nitrene project are an integral part of the accompanying proposal. References in this progress report are kept to a minimum; extensive references in the papers cited here place the work in perspective relative to the literature landscape.

  20. Noise Reduction, Atmospheric Pressure Admittance Estimation and Long-Period Component Extraction in Time-Varying Gravity Signals Using Ensemble Empirical Mode Decomposition

    Directory of Open Access Journals (Sweden)

    Linsong Wang

    2015-01-01

    Full Text Available Time-varying gravity signals, with their nonlinear, non-stationary and multi-scale characteristics, record the physical responses of various geodynamic processes and consist of a blend of signals with various periods and amplitudes, corresponding to numerous phenomena. Superconducting gravimeter (SG records are processed in this study using a multi-scale analytical method and corrected for known effects to reduce noise, to study geodynamic phenomena using their gravimetric signatures. Continuous SG (GWR-C032 gravity and barometric data are decomposed into a series of intrinsic mode functions (IMFs using the ensemble empirical mode decomposition (EEMD method, which is proposed to alleviate some unresolved issues (the mode mixing problem and the end effect of the empirical mode decomposition (EMD. Further analysis of the variously scaled signals is based on a dyadic filter bank of the IMFs. The results indicate that removing the high-frequency IMFs can reduce the natural and man-made noise in the data, which are caused by electronic device noise, Earth background noise and the residual effects of pre-processing. The atmospheric admittances based on frequency changes are estimated from the gravity and the atmospheric pressure IMFs in various frequency bands. These time- and frequency-dependent admittance values can be used effectively to improve the atmospheric correction. Using the EEMD method as a filter, the long-period IMFs are extracted from the SG time-varying gravity signals spanning 7 years. The resulting gravity residuals are well correlated with the gravity effect caused by the _ polar motion after correcting for atmospheric effects.

  1. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 5 Report: Generation IV Reactor Virtual Mockup Proof-of-Principle Study

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Task 5 report is part of a 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Created a virtual mockup of PBMR reactor cavity and discussed applications of virtual mockup technology to improve Gen IV design review, construction planning, and maintenance planning

  2. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 5 Report: Generation IV Reactor Virtual Mockup Proof-of-Principle Study

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 5 report is part of a 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Created a virtual mockup of PBMR reactor cavity and discussed applications of virtual mockup technology to improve Gen IV design review, construction planning, and maintenance planning.

  3. Expectation and task for constructing the volume reduction system of removed soils. In search of the technical integrity from the intermediate storage to final disposal

    International Nuclear Information System (INIS)

    Mori, Hisaki

    2016-01-01

    The intermediate storage volume of the removed soils and incineration ash in Fukushima is supposed about 22 million cubic meters. Within 30 years after starting the intermediate storage, the final disposal outside Fukushima prefecture to these removed soils and incineration ash is determined by the law. Because these removed soils are the very-very low radio activity, the volume reduction method is most effective to reduce the burden of the final disposal. As the volume reduction technology is the stage of research and development, the possibility of the introduction of the volume reduction technology that has the consistency of the final disposal technology is evaluated from the point of view of cost. Since this business is accompanied by economic and technical risk to implement private companies, this project is considered appropriate to be implemented as a national project. (author)

  4. Summary of nuclear power plant construction

    International Nuclear Information System (INIS)

    Tamura, Saburo

    1973-01-01

    Various conditions for the construction of nuclear power plants in Japan without natural resources were investigated. Expansion of the sites of plants, change of reactor vessels, standardization of nuclear power plants, possiblity of the reduction of construction period, approaching of nuclear power plants to consuming cities, and group construction were studied. Evaluation points were safety and economy. Previous sites of nuclear power plants were mostly on plane ground or cut and enlarge sites. Proposals for underground or offshore plants have been made. The underground plants were made at several places in Europe, and the ocean plant is now approved in U.S.A. as a plant on a man-made island. Vessels for containing nuclear reactors are the last barriers to the leakage of radioactive substance. At the initial period, the vessels were made of steel, which were surrounded by shielding material. Those were dry well type containers. Then, vessel type changed to pressure-suppression type wet containers. Now, it tends to concrete (PC or RC) type containers. There is the policy on the standardization of nuclear power plants by U.S.A.E.C. in recent remarkable activity. The merit and effect of the standardization were studied, and are presented in this paper. Cost of the construction of nuclear power plants is expensive, and interest of money is large. Then, the reduction of construction period is an important problem. The situations of plants approaching to consuming cities in various countries were studied. Idea of group construction is described. (Kato, T.)

  5. VE of construction industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-10-15

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  6. VE of construction industry

    International Nuclear Information System (INIS)

    1987-10-01

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  7. USAID Construction Assessment

    Data.gov (United States)

    US Agency for International Development — The USAID construction assessment is a survey of the character, scope, value and management of construction activities supported by USAID during the period from June...

  8. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

  9. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications

  10. Construction of Au@Pt core—satellite nanoparticles based on in-situ reduction of polymeric ionic liquid protected gold nanoparticles

    Science.gov (United States)

    Wu, Wenlan; Li, Junbo; Zou, Sheng; Guo, Jinwu; Zhou, Huiyun

    2017-03-01

    A method of in-situ reduction to prepare Au@Pt core-satellite nanoparticles (NPs) is described by using Au NPs coating poly[1-methyl 3-(2-methacryloyloxy propylimidazolium bromine)] (PMMPImB-@-Au NPs) as the template. After electrostatic complex chloroplatinic acid with PMMPImB shell, the composite NP was directly reduced with N2H4 to produce Au@Pt core-satellite NPs. The characterization of composite and core-satellite NPs under different amounts of chloroplatinic acid were studied by DLS, UV-vis absorption spectrum and TEM. The satellite Pt NPs with a small size ( 2 nm) dotted around Au core, and the resulting Au@Pt core-satellite NPs showed a red-shift surface plasmon resonance (SPR) and a good dispersion due to effectively electrostatic repulsion providing by the polymeric ionic liquid (PIL) shell. Finally, Au@Pt core-satellite NPs exhibit an enhanced catalytic activity and cycled catalytic capability for the reduction of p-nitrophenol with NaBH4.

  11. Constructing Cd0.5Zn0.5S@ZIF-8 nanocomposites through self-assembly strategy to enhance Cr(VI) photocatalytic reduction.

    Science.gov (United States)

    Qiu, Jianhao; Zhang, Xiong-Fei; Zhang, Xingguang; Feng, Yi; Li, Yuxin; Yang, Lvye; Lu, Haiqiang; Yao, Jianfeng

    2018-05-05

    A novel and highly efficient photocatalyst of Cd 0.5 Zn 0.5 S@ZIF-8 nanocomposite has been developed by a facile self-assembly strategy. This is the first report on the application of Cd x Zn 1-x S and metal-organic framework (MOF) nanocomposite as photocatalysts for the reduction of Cr(VI). The resulting Cd 0.5 Zn 0.5 S@ZIF-8 exhibited higher photocatalytic activity than that of pristine Cd 0.5 Zn 0.5 S and ZIF-8. Particularly, the CZS@Z60 composite with 60 wt% of ZIF-8 exhibited a photocatalytic activity that is about 1.6 times as high as that of Cd 0.5 Zn 0.5 S. The dominant reason for the improved photocatalytic reduction potential is proved to be the newly-formed interfacial SZn bonds that firmly connect Cd 0.5 Zn 0.5 S and ZIF-8 and substantially improve the separation efficiency of photo-excited electrons and holes. The newly-formed chemical bonds are confirmed by XPS analyses, and the prolonged lifetime of photo-excited electrons is evidenced by the electrochemical measurement of photocurrent, which shows that the photocurrent on Cd 0.5 Zn 0.5 S@ZIF-8 is much higher than that of Cd 0.5 Zn 0.5 S and ZIF-8. This study clearly demonstrates that the MOF-based composite nanomaterials hold great promises for applications in the field of environmental remediation and for design of novel photocatalytic materials. Copyright © 2018 Elsevier B.V. All rights reserved.

  12. Analysis of the Problems and Countermeasures in Teacher Ethics Construction of Social Transformation Period%社会转型期高校师德师风建设问题与对策探析

    Institute of Scientific and Technical Information of China (English)

    王文中

    2014-01-01

    社会转型时期,多元化的价值观念冲击着高校校园,高校师德师风建设面临全新的挑战,高校师德出现学术功利化、缺乏奉献与合作创新精神等滑坡现象,文章通过对其现状和原因的分析认为可采取加强教师思想道德教育,构建公正合理的学术评价体系及具体量化的师德评价体系等三方面的对策来加强和改善。%Diversified values of social transformation period are sweeping the university campuses , posing new challenges to university teacher ethics construction . Through analysis of the causes to such problems in teacher ethics as academic utilitarianism , lack of dedication , and poor cooperation and innovation , this thesis holds that teacher ethics can be improved and consolidated from three aspects: strengthening ideological and moral education , establishing fair and reasonable academic evaluation system , and constructing specific and quantitive teacher ethics assessment system .

  13. Accidents in Malaysian construction industry: statistical data and court cases.

    Science.gov (United States)

    Chong, Heap Yih; Low, Thuan Siang

    2014-01-01

    Safety and health issues remain critical to the construction industry due to its working environment and the complexity of working practises. This research attempts to adopt 2 research approaches using statistical data and court cases to address and identify the causes and behavior underlying construction safety and health issues in Malaysia. Factual data on the period of 2000-2009 were retrieved to identify the causes and agents that contributed to health issues. Moreover, court cases were tabulated and analyzed to identify legal patterns of parties involved in construction site accidents. Approaches of this research produced consistent results and highlighted a significant reduction in the rate of accidents per construction project in Malaysia.

  14. Construction of an all-solid-state artificial Z-scheme system consisting of Bi2WO6/Au/CdS nanostructure for photocatalytic CO2 reduction into renewable hydrocarbon fuel

    Science.gov (United States)

    Wang, Meng; Han, Qiutong; Li, Liang; Tang, Lanqin; Li, Haijin; Zhou, Yong; Zou, Zhigang

    2017-07-01

    An all-solid-state Bi2WO6/Au/CdS Z-scheme system was constructed for the photocatalytic reduction of CO2 into methane in the presence of water vapor. This Z-scheme consists of ultrathin Bi2WO6 nanoplates and CdS nanoparticles as photocatalysts, and a Au nanoparticle as a solid electron mediator offering a high speed charge transfer channel and leading to more efficient spatial separation of electron-hole pairs. The photo-generated electrons from the conduction band (CB) of Bi2WO6 transfer to the Au, and then release to the valence band (VB) of CdS to recombine with the holes of CdS. It allows the electrons remaining in the CB of CdS and holes in the VB of Bi2WO6 to possess strong reduction and oxidation powers, respectively, leading the Bi2WO6/Au/CdS to exhibit high photocatalytic reduction of CO2, relative to bare Bi2WO6, Bi2WO6/Au, and Bi2WO6/CdS. The depressed hole density on CdS also enhances the stability of the CdS against photocorrosion.

  15. Ways of decreasing the labour content and construction duration for the RBMK-1000 NPP

    International Nuclear Information System (INIS)

    Chernyshenko, V.M.

    1984-01-01

    Problems associated with reducing the labour content and duration of construction for the RBMK-1000 NPPs are considered. General and specific labour contents for construction of the first units at the Kursk and Chernobylsk, NPPs as well as progress chart for construction-installation work at the 1-st unit of the Smolensk and 3-d unit of the Chernobylsk NPPs are presented. The analysis has shown that reduction in the general labour costs and therefore, duration of construction can be attained by reducing the number of auxiliary objects, increasing the level and mechanization of construction (with optimum utilization of gantry and turret cranes) as well as by mechanization of placing concrete mortars and use of large-block structures. According to preliminary calculations, the introduction of new solutions would ensure reduction of construction periods to 24 months for the second units and reduction of labour content by 8 to 10% at the Kursk and Chernobylsk NPPs

  16. Constructing Catalonia

    Directory of Open Access Journals (Sweden)

    Bill Philips

    2009-07-01

    Full Text Available Catalonia, in common with other nations, has long been concerned with the question of identity and difference. Its problematic relationship with Spain has led to an emphasis on differentiating itself from its larger neighbour (if we are to accept, as most Spaniards do not, that Catalonia is not Spain, a situation complicated by the loss of the Spanish colonies of Cuba and The Philippines in 1898, and the Spanish Civil War and subsequent dictatorship from 1936 to 1976. Beginning in the late nineteenth century, the construction of a Catalan identity followed a similar route to that taken by other European nations such as England, Ireland and, indeed, Spain, including an emphasis on rural values, activities and the countryside, and the conversion of specifically local traditions into national past times. It is only in the last ten years or so that this model of Catalan identity has been recognised for what it is – a model constructed and encouraged for and by specific nationalist political interests. Ironically, Catalonia’s identity abroad has also been constructed and manipulated for political purposes, but from quite a different perspective. Orwell’s /Homage to Catalonia/ (1938 narrates an extremely blinkered version of the Spanish Civil War which has achieved iconic status as a result of cold war politics. Subsequent portrayals of the Spanish Civil War – Valentine Cunningham’s /The Penguin Book of Spanish Civil War Verse/ (ed., Penguin, 1980, or Ken Loach’s 1995 film /Land and Freedom/ base their arguments unquestioningly on /Homage to Catalonia/, perpetuating a view of the nation’s recent history that is both reductive and inaccurate

  17. Accelerating risk reduction in Kathmandu Valley, Nepal: Theory-based mass-media intervention proven to increase knowledge of, belief in, and intent to support earthquake-resistant construction.

    Science.gov (United States)

    Sanquini, A.; Thapaliya, S. M.; Wood, M. M.; Hilley, G. E.

    2015-12-01

    Motivating people in rapidly urbanizing areas to take protective actions against natural disasters faces the challenge that these people often do not know what actions to take, do not believe that such actions are effective, and/or believe that the disaster will not happen to them within their lifetimes. Thus, finding demonstrated ways of motivating people to take protective action likely constitutes a grand challenge for natural disaster risk reduction and resiliency, because it may be one of the largest, lowest-cost sources of potential risk reduction in these situations. We developed a theory-based documentary film (hereafter, intervention) targeted at motivating retrofits of local school buildings, and tested its effectiveness in Kathmandu, Nepal, using a matched-pair clustered randomized controlled trial. The intervention features Nepalese who have strengthened their school buildings as role models to others at schools still in need of seismic work. It was tested at 16 Kathmandu Valley schools from November 2014 through March 2015. Schools were matched into 8 pairs, then randomly assigned to see either the intervention film or an attention placebo control film on an unrelated topic. Testing was completed just five weeks before the M 7.8 Gorkha earthquake struck central Nepal. When compared to the control schools, the schools whose community members saw the retrofit intervention film increased their knowledge of specific actions to take in support of earthquake-resistant construction, belief in the feasibility of making buildings earthquake-resistant, willingness to support seismic strengthening of the local school building, and likelihood to recommend to others that they build earthquake-resistant homes, which have all been shown to be precursors to taking self-protective action. This suggests that employing a mass-media intervention featuring community members who have already taken the desired action increases factors that may accelerate adoption of risk

  18. Problem Periods

    Science.gov (United States)

    ... ovary syndrome. Read our information on PCOS for teens , and see your doctor if you think you may have PCOS. Major weight loss. Girls who have anorexia will often stop having periods. When to see ...

  19. Visualization of construction engineering

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun

    2000-01-01

    It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)

  20. Finding optimal exact reducts

    KAUST Repository

    AbouEisha, Hassan M.

    2014-01-01

    The problem of attribute reduction is an important problem related to feature selection and knowledge discovery. The problem of finding reducts with minimum cardinality is NP-hard. This paper suggests a new algorithm for finding exact reducts with minimum cardinality. This algorithm transforms the initial table to a decision table of a special kind, apply a set of simplification steps to this table, and use a dynamic programming algorithm to finish the construction of an optimal reduct. I present results of computer experiments for a collection of decision tables from UCIML Repository. For many of the experimented tables, the simplification steps solved the problem.

  1. Periods and Nori motives

    CERN Document Server

    Huber, Annette

    2017-01-01

    This book casts the theory of periods of algebraic varieties in the natural setting of Madhav Nori’s abelian category of mixed motives. It develops Nori’s approach to mixed motives from scratch, thereby filling an important gap in the literature, and then explains the connection of mixed motives to periods, including a detailed account of the theory of period numbers in the sense of Kontsevich-Zagier and their structural properties. Period numbers are central to number theory and algebraic geometry, and also play an important role in other fields such as mathematical physics. There are long-standing conjectures about their transcendence properties, best understood in the language of cohomology of algebraic varieties or, more generally, motives. Readers of this book will discover that Nori’s unconditional construction of an abelian category of motives (over fields embeddable into the complex numbers) is particularly well suited for this purpose. Notably, Kontsevich's formal period algebra represents a to...

  2. Constructed Wetlands

    Science.gov (United States)

    these systems can improve water quality, engineers and scientists construct systems that replicate the functions of natural wetlands. Constructed wetlands are treatment systems that use natural processes

  3. Human Resource Construction

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    Centering on strategic objective of reform and development,CIAE formulated its objectives in human resource construction for the 13th Five-year Plan period,and achieved new apparent progress in human resource construction in 2015.1 Implementation of"LONGMA Project"

  4. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  5. Research report for fiscal 1998. Research about feasibility of CO{sub 2} reduction program construction for Pan-Japan sea resources; 1998 nendo chosa hokokusho. Kannihonkai shigen CO{sub 2} sakugen program kochiku kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The research aims to construct a recyclable resources distribution network in coordination with other Japan Sea countries so as to establish measures for the effective utilization of resources originating in Japan. The research covers the needs in China and in Russia's Far East provinces for used electrical home appliances and the supply capability of Japan's four prefectures on Japan Sea including Akita Prefecture. Demand in the countries on the other side of the sea for three major categories of electrical home appliances (color television sets, washing machines, and refrigerators) for 2010 and 2025 is predicted. Part of the predicted demand is specified to be for used items, and a scenario is built based on the reuse substitution rate. On the other hand, in view of the life time of such commodities and the rate of reusables in the amount of waste generated, a conclusion is reached that probabilities are that all such appliances from the four Japanese prefectures will be put to reuse. When the reuse rate is estimated at 10% for goods under the three major categories from the four prefectures, approximately 20,000 articles out of each of the three categories will be put to reuse, and this will lead to a reduction of CO2 emissions of 7700 tons a year. (NEDO)

  6. Research report for fiscal 1998. Research about feasibility of CO{sub 2} reduction program construction for Pan-Japan sea resources; 1998 nendo chosa hokokusho. Kannihonkai shigen CO{sub 2} sakugen program kochiku kanosei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The research aims to construct a recyclable resources distribution network in coordination with other Japan Sea countries so as to establish measures for the effective utilization of resources originating in Japan. The research covers the needs in China and in Russia's Far East provinces for used electrical home appliances and the supply capability of Japan's four prefectures on Japan Sea including Akita Prefecture. Demand in the countries on the other side of the sea for three major categories of electrical home appliances (color television sets, washing machines, and refrigerators) for 2010 and 2025 is predicted. Part of the predicted demand is specified to be for used items, and a scenario is built based on the reuse substitution rate. On the other hand, in view of the life time of such commodities and the rate of reusables in the amount of waste generated, a conclusion is reached that probabilities are that all such appliances from the four Japanese prefectures will be put to reuse. When the reuse rate is estimated at 10% for goods under the three major categories from the four prefectures, approximately 20,000 articles out of each of the three categories will be put to reuse, and this will lead to a reduction of CO2 emissions of 7700 tons a year. (NEDO)

  7. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  8. Construction time of PWRs

    International Nuclear Information System (INIS)

    Moreira, João M.L.; Gallinaro, Bruno; Carajilescov, Pedro

    2013-01-01

    The construction time of PWRs is studied considering published data about nuclear power plants in the world. For the 268 PWRs in operation in 2010, the mode of the construction time distribution is around 5–6 years, and 80% of the plants were built in less than 120 months. To circumvent the problem of comparing plants with different size we normalized the construction time to plants with 1 GW. We restricted the analysis to 201 PWRs which suffered less from external factors that were beyond the control of the management from 1965 to 2010. The results showed that the normalized construction time did not increase over the years and nor with the plants’ gross power level. The learning rate of the industry regarding normalized construction times showed a reduction with 95% confidence level of about 0.56±0.07 months for each 10 GW of installed capacity. Over the years the normalized construction time decreased and became more predictable. The data showed that countries with more centralized regulatory, construction and operation environments were able to build PWRs in shorter times. Countries less experienced with the nuclear technology built PWRs in longer times. - Highlights: ► The construction time of PWRs is analyzed based on historical data. ► Different factors affecting construction time are considered in the analyses. ► The normalized construction time of PWRs decreased with time and gross power level. ► Countries with more centralized institutions built PWRs more quickly

  9. Linking response strategies adopted by construction firms during the 2007 economic recession to Porter’s generic strategies

    OpenAIRE

    Tansey, Paul; Spillane, John P.; Meng, Xianhai

    2014-01-01

    The time period bridging the years 2007 to 2012 will be remembered as one characterised by dramatic changes in the Irish and UK construction industries. Construction companies witnessed unprecedented changes in the environment, namely the coincidence of a sharp economic downturn, the significant decline of public works, a reduction in lending, increased competition, and structural changes in the marketplace. Nevertheless, little has been documented on what response strategies construction com...

  10. Reduction operators of Burgers equation.

    Science.gov (United States)

    Pocheketa, Oleksandr A; Popovych, Roman O

    2013-02-01

    The solution of the problem on reduction operators and nonclassical reductions of the Burgers equation is systematically treated and completed. A new proof of the theorem on the special "no-go" case of regular reduction operators is presented, and the representation of the coefficients of operators in terms of solutions of the initial equation is constructed for this case. All possible nonclassical reductions of the Burgers equation to single ordinary differential equations are exhaustively described. Any Lie reduction of the Burgers equation proves to be equivalent via the Hopf-Cole transformation to a parameterized family of Lie reductions of the linear heat equation.

  11. [Advances in microbial genome reduction and modification].

    Science.gov (United States)

    Wang, Jianli; Wang, Xiaoyuan

    2013-08-01

    Microbial genome reduction and modification are important strategies for constructing cellular chassis used for synthetic biology. This article summarized the essential genes and the methods to identify them in microorganisms, compared various strategies for microbial genome reduction, and analyzed the characteristics of some microorganisms with the minimized genome. This review shows the important role of genome reduction in constructing cellular chassis.

  12. Electrochemical construction

    Science.gov (United States)

    Einstein, Harry; Grimes, Patrick G.

    1983-08-23

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  13. Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmesen, Torkil; Hornbæk, Kasper Anders Søren

    2007-01-01

    Whereas research on usability predominantly employs universal definitions of the aspects that comprise usability, people experience their use of information systems through personal constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected...... use of constructs traditionally associated with usability (e.g., easy-to-use, intuitive, and liked). Further analysis of the data is ongoing...

  14. Reduction redux.

    Science.gov (United States)

    Shapiro, Lawrence

    2018-04-01

    Putnam's criticisms of the identity theory attack a straw man. Fodor's criticisms of reduction attack a straw man. Properly interpreted, Nagel offered a conception of reduction that captures everything a physicalist could want. I update Nagel, introducing the idea of overlap, and show why multiple realization poses no challenge to reduction so construed. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Construction mathematics

    CERN Document Server

    Virdi, Surinder; Virdi, Narinder Kaur

    2014-01-01

    Construction Mathematics is an introductory level mathematics text, written specifically for students of construction and related disciplines. Learn by tackling exercises based on real-life construction maths. Examples include: costing calculations, labour costs, cost of materials and setting out of building components. Suitable for beginners and easy to follow throughout. Learn the essential basic theory along with the practical necessities. The second edition of this popular textbook is fully updated to match new curricula, and expanded to include even more learning exercises. End of chapter exercises cover a range of theoretical as well as practical problems commonly found in construction practice, and three detailed assignments based on practical tasks give students the opportunity to apply all the knowledge they have gained. Construction Mathematics addresses all the mathematical requirements of Level 2 construction NVQs from City & Guilds/CITB and Edexcel courses, including the BTEC First Diploma in...

  16. FFTF constructibility

    International Nuclear Information System (INIS)

    Weber, S.A.; Hulbert, D.I.

    1975-01-01

    The influence of the design criteria on the constructibility of the Fast Flux Test Facility is described. Specifically, the effects of requirements due to maintenance accessibility, inerting of cells, seismicity, codes, and standards are addressed. The design and construction techniques developed to minimize the impact of the design criteria on cost and schedule are presented with particular emphasis on the cleanliness and humidity controls imposed during construction of the sodium systems. (U.S.)

  17. Investigação teórica do processo de redução de coliformes em leitos cultivados Theoretical investigation of coliform reduction in constructed wetland

    Directory of Open Access Journals (Sweden)

    Mariângela Amendola

    2007-12-01

    Full Text Available Este artigo mostra a continuidade da pesquisa sugerida por Amendola et al. (2003, para o caso em que se quer buscar maior precisão na investigação teórica do processo de redução de poluentes, em função do meio suporte usado em sistemas de leitos cultivados. Esta investigação se dá via modelagem matemática e simulação numérica do processo descrito por uma equação diferencial parcial de difusão-advecção, que envolve constantes que caracterizam o meio suporte (Moreno-Grau, 1996 e deve ser associada a condições iniciais e de contorno, estabelecidas de acordo com um procedimento experimental previamente realizado. Para resolução da equação implementa-se um algoritmo baseado no esquema implícito do método de diferenças finitas que, executado no MATLAB 6.1, gera valores da concentração dos poluentes que dependem dos valores das referidas constantes. Os resultados obtidos da simulação são comparados com valores de referência para a determinação do valor do coeficiente de dispersão longitudinal que, por sua vez, gera o menor resíduo para cada tipo de meio suporte do leito cultivado. Os resultados obtidos levam à conclusão de que o leito cultivado com brita e pneu picado é mais eficiente que aquele só com brita na remoção de coliformes fecais e totais.This paper shows the continuity of the research, as suggested by Amendola et al. (2003, when looking for better accuracy in the theoretical investigation of the pollutant reduction as a function of the support bed used in constructed wetland. This investigation is performed through the mathematical modeling and numerical simulation of the process, which is described by an advection-diffusion differential equation. This equation depends on certain constants which characterize the support bed (Moreno-Grau, 1996, and must be associated to the initial and boundary conditions established according to the experimental procedure. To solve the equation an algorithm based

  18. Reports on construction experience of Monju, 1

    International Nuclear Information System (INIS)

    Nagahiro, Yoshihiko; Okuma, Nobutaka; Jin, Satoru; Odo, Toshihiro; Wachi, Eiji.

    1991-01-01

    Following are a part of results obtained through the design and fabrication works of Monju construction; (1) strengthening-ring, attached to the large-diameter containment vessel as a countermeasure for the buckling stress induced by the outer pressure, were effective also on the seismic design, (2) design and evaluation methods have been established for the ferro-concrete structure under the condition of high temperature in case of the sodium leakage accidents, and reduced scale models were confirmed to be very useful to make arrangements for execution of the complex structure, (3) steel-plate-concrete structures which are applied to Monju biological shielding wall have been confirmed to attain the high precision of the construction and the reduction of the period required for the installation works, and (4) an optimum design was obtained for the lining system with the functions required in case of the sodium leakage accidents by using a combination of three types of liners. (author)

  19. Construction Management.

    Science.gov (United States)

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  20. Construction fraud

    NARCIS (Netherlands)

    Graafland, J.J.; Liedekerke, L.; Dubbink, W.; van Liedekerke, L.; van Luijk, H.

    2011-01-01

    Due to the actions of a whistleblower The Netherlands was confronted with a massive case of construction fraud involving almost the entire construction sector. Price fixing, prior consulting, duplicate accounts, fictitious invoices and active corruption of civil servants were rampant practices. This

  1. Superstring construction

    CERN Document Server

    1989-01-01

    The book includes a selection of papers on the construction of superstring theories, mainly written during the years 1984-1987. It covers ten-dimensional supersymmetric and non-supersymmetric strings, four-dimensional heterotic strings and four-dimensional type-II strings. An introduction to more recent developments in conformal field theory in relation to string construction is provided.

  2. Holonomic systems for period mappings

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Jingyue, E-mail: jychen@brandeis.edu [Department of Mathematics, Brandeis University, Waltham, MA 02454 (United States); Huang, An, E-mail: anhuang@math.harvard.edu [Department of Mathematics, Harvard University, Cambridge, MA 02138 (United States); Lian, Bong H., E-mail: lian@brandeis.edu [Department of Mathematics, Brandeis University, Waltham, MA 02454 (United States)

    2015-09-15

    Period mappings were introduced in the sixties [4] to study variation of complex structures of families of algebraic varieties. The theory of tautological systems was introduced recently [7,8] to understand period integrals of algebraic manifolds. In this paper, we give an explicit construction of a tautological system for each component of a period mapping. We also show that the D-module associated with the tautological system gives rise to many interesting vanishing conditions for period integrals at certain special points of the parameter space.

  3. Fisioterapia para redução da diástase dos músculos retos abdominais no pós-parto Physiotherapy for reduction of diastasis of the recti abdominis muscles in the postpartum period

    Directory of Open Access Journals (Sweden)

    Luciana Aparecida Mesquita

    1999-06-01

    Full Text Available Objetivos: constatar se a intervenção fisioterápica no puerpério imediato é capaz de contribuir para a redução da diástase mais precocemente. Métodos: foi realizado um estudo longitudinal e aleatório, com 50 puérperas recrutadas na Maternidade-Escola Hilda Brandão da Santa Casa de Belo Horizonte (MEHB-SCBH, no período de abril a setembro de 1998. O grupo controle (N = 25 foi submetido à avaliação e mensuração da diástase (6 horas e 18 horas após o parto e no grupo de tratamento (N = 25 foi realizada a mesma avaliação e mensuração acima, assim como um protocolo de atendimento fisioterápico, 6 e 18 horas após o parto. Utilizou-se um paquímetro, instrumento de medida de precisão, na mensuração da diástase nas avaliações. Resultados: no período de 18 horas pós-parto, o grupo controle apresentou uma redução da diástase de 5,4% e o grupo de tratamento de 12,5%, em relação à primeira medida (6 horas após o parto, (pPurpose: to check if physiotherapy immediately after childbirth may contribute to early diastasis reduction. Methods: longitudinal and randomized study with 50 parturient women recruited in the Maternidade-Escola Hilda Brandão of the Santa Casa of Belo Horizonte, from April to September 1998. The control group (N = 25 was submitted to evaluation and measurement (6 h and 18 h after labor, and the treatment group (N = 25 was submitted to the same evaluation and measurement as above, as well as to a protocol for physiotherapeutic assistance, 6 and 18 h after labor. For the evaluations, a pachymeter, a precision instrument, was used to measure diastasis. Results: at 18 h after parturition, the control group presented a diastasis reduction of 5.4%, and the treatment group of 12.5%, as related to the first measure (6 h after delivery (p<0.001, with a confidence interval of 99%. Conclusions: these results show that the physiotherapeutic assistance immediately after childbirth determines a significant

  4. El sector de la construcción en la provincia de León a lo largo del periodo 1990-2013 = The construction industry in the province of León during the period 1990-2013

    Directory of Open Access Journals (Sweden)

    Pedro María Martínez Villar

    2014-12-01

    Despite the intense crisis experienced by the sector since 2007, construction activity remains important for the entire provincial economy. Forasmuch as 17.36% of the total of Leon companies have direct activity with construction and its industry continues to provide figures close to 10% of the provincial VAB in terms of employment and the sector still employs 15,200 workers in the province. In this sense, the fact remains that the crisis not only has driven a significant number of workers out of the sector, but it has also caused a significant deterioration of the contractual quality of the new jobs, and resulting in a significant reduction in wages as major characteristics of work sector market adjustment.

  5. Worldwide construction

    International Nuclear Information System (INIS)

    Williamson, M.

    1994-01-01

    The paper lists major construction projects in worldwide processing and pipelining, showing capacities, contractors, estimated costs, and time of construction. The lists are divided into refineries, petrochemical plants, sulfur recovery units, gas processing plants, pipelines, and related fuel facilities. This last classification includes cogeneration plants, coal liquefaction and gasification plants, biomass power plants, geothermal power plants, integrated coal gasification combined-cycle power plants, and a coal briquetting plant

  6. Next Generation CANDU: Conceptual Design for a Short Construction Schedule

    International Nuclear Information System (INIS)

    Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville

    2002-01-01

    Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

  7. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  8. Constructive Dimension and Turing Degrees

    OpenAIRE

    Bienvenu, Laurent; Doty, David; Stephan, Frank

    2007-01-01

    This paper examines the constructive Hausdorff and packing dimensions of Turing degrees. The main result is that every infinite sequence S with constructive Hausdorff dimension dim_H(S) and constructive packing dimension dim_P(S) is Turing equivalent to a sequence R with dim_H(R) 0. Furthermore, if dim_P(S) > 0, then dim_P(R) >= 1 - epsilon. The reduction thus serves as a *randomness extractor* that increases the algorithmic randomness of S, as measured by constructive dimension. A number of...

  9. Construction safety

    CERN Document Server

    Li, Rita Yi Man

    2013-01-01

    A close-to-ideal blend of suburb and city, speedy construction of towers of Babylon, the sparkling proportion of glass and steel buildings’ facade at night showcase the wisdom of humans. They also witness the footsteps, sweats and tears of architects and engineers. Unfortunately, these signatures of human civilizations are swathed in towering figures of construction accidents. Fretting about these on sites, different countries adopt different measures on sites. This book firstly sketches the construction accidents on sites, followed by a review on safety measures in some of the developing countries such as Bermuda, Egypt, Kuwait and China; as well as developed countries, for example, the United States, France and Singapore. It also highlights the enormous compensation costs with the courts’ experiences in the United Kingdom and Hong Kong.

  10. Reduction corporoplasty.

    Science.gov (United States)

    Hakky, Tariq S; Martinez, Daniel; Yang, Christopher; Carrion, Rafael E

    2015-01-01

    Here we present the first video demonstration of reduction corporoplasty in the management of phallic disfigurement in a 17 year old man with a history sickle cell disease and priapism. Surgical management of aneurysmal dilation of the corpora has yet to be defined in the literature. We preformed bilateral elliptical incisions over the lateral corpora as management of aneurysmal dilation of the corpora to correct phallic disfigurement. The patient tolerated the procedure well and has resolution of his corporal disfigurement. Reduction corporoplasty using bilateral lateral elliptical incisions in the management of aneurysmal dilation of the corpora is a safe an feasible operation in the management of phallic disfigurement.

  11. Constructing sanctions

    DEFF Research Database (Denmark)

    Jaeger, Mark Daniel

    2016-01-01

    such an effect. This paper explores sanctions conflicts as social constructs. It purports that rally-around-the-flag is all but one part of the discursive dimension of sanctions conflicts. Sanctions are intricately connected with the conflict setting they occur in. The study suggests a dialectical relation...... between how opponents perceive conflicts and the meaning of sanctions therein. This nexus of different constructions of sanctions moreover extends to “targeted” sanctions as well: As restrictive measures against Zimbabwe demonstrate, they are not the kind of minimally-invasive operations with clinical...

  12. Safety-related concrete structure design and construction of Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Morishita, Hideki; Munakata, Yoshinari; Togashi, Akihito

    2003-01-01

    The Rokkasho Reprocessing Plant of the Japan Nuclear Fuel Co. Ltd., is a facility to reprocess remained uranium without firing and newly formed plutonium contained in spent fuels used at the nuclear power stations, to produce fuels to be repeatedly used. Constructions in this facility has some characteristics shown as follows: 1) radiation shielding and seismic isolated functions like those at the nuclear power plants, 2) reduction of wall thickness based on partially using heavy concrete at walls required for radiation shielding, 3) protective design against fly-coming matters such as aircrafts, 4) construction period reduction based on winter construction and large scale block engineering. Here were described characteristics of designs on radiation shielding, seismic isolated and fly-coming matters protection construction engineering and quality control on concrete. (G.K.)

  13. Construction work

    CERN Multimedia

    2004-01-01

    Construction work on building 179 will start on the 16th February 2004 and continue until November 2004. The road between buildings 179 and 158 will temporarily become a one way street from Route Democrite towards building 7. The parking places between buildings 179 and 7 will become obsolete. The ISOLDE collaboration would like to apologize for any inconveniences.

  14. Constructability and maintainability

    International Nuclear Information System (INIS)

    Hart, R.S.

    1985-01-01

    A set of principles for minimizing the construction schedule was established at the outset of the CANDU 300 programme. Consideration of these principles and other factors led to the development of the unique CANDU 300 station layout. The paper discusses the CANDU 300 station layout and construction methods. In summary, the station layout provides 360 deg. construction access to all buildings, separation of nuclear and non-nuclear systems, precise and minimal physical interfaces between buildings, accommodation of many contractors and construction activities without interference, and maximum flexibility in terms of constructional, financial and supply arrangements. The CANDU 300 further employs modularization, shop fabrication and advanced instrumentation (multiplexers, remote processors, data highways) to minimize construction time. Many of the CANDU 300 features that enhance constructability also contribute to maintainability. These include the 360 deg. access to all principal buildings, the uncluttered and spacious building layouts, the simplification of systems and the high level of modularization. The CANDU 300 has also been designed to facilitate the replacement of all key components, thereby offering an essentially unlimited station life. A prime example is a reduction in the fuel channel inlet end-fitting diameter such that the fuel channels can be shop assembled and easily replaced after the initial 40 years of operation, without an extended unit outage. Maintainability within the reactor building has been given particular attention in the CANDU 300 design; key features of other CANDU reactors (the ability to replace a heat transport system pump motor at power, for example) have been incorporated, while accessibility and maintainability of all systems and components have been enhanced. These and other aspects of maintainability are discussed. (author)

  15. Reduction Corporoplasty

    Directory of Open Access Journals (Sweden)

    Tariq S. Hakky

    2015-04-01

    Full Text Available Objective Here we present the first video demonstration of reduction corporoplasty in the management of phallic disfigurement in a 17 year old man with a history sickle cell disease and priapism. Introduction Surgical management of aneurysmal dilation of the corpora has yet to be defined in the literature. Materials and Methods: We preformed bilateral elliptical incisions over the lateral corpora as management of aneurysmal dilation of the corpora to correct phallic disfigurement. Results The patient tolerated the procedure well and has resolution of his corporal disfigurement. Conclusions Reduction corporoplasty using bilateral lateral elliptical incisions in the management of aneurysmal dilation of the corpora is a safe an feasible operation in the management of phallic disfigurement.

  16. Reductive Bis-addition of Aromatic Aldehydes to α,β-Unsaturated Esters via the Use of Sm/Cu(I) in Air: A Route to the Construction of Furofuran Lignans.

    Science.gov (United States)

    Liu, Yongjun; Tian, Guang; Li, Jingjing; Qi, Yan; Wen, Yonghong; Du, Feng

    2017-06-02

    The novel bis-addition of benzaldehydes to acrylates or maleates was achieved by the direct use of samarium metal with the assistance of CuI under mild conditions under dry air, and the useful 2-hydroxylalkyl-γ-butyrolactons and lignan derivatives were thus constructed with high efficiency. The key factors that influence the reaction efficiency were investigated. The use of potassium iodide and molecular sieves as additives can improve the reaction efficiency remarkably.

  17. Modelling Constructs

    DEFF Research Database (Denmark)

    Kindler, Ekkart

    2009-01-01

    , these notations have been extended in order to increase expressiveness and to be more competitive. This resulted in an increasing number of notations and formalisms for modelling business processes and in an increase of the different modelling constructs provided by modelling notations, which makes it difficult......There are many different notations and formalisms for modelling business processes and workflows. These notations and formalisms have been introduced with different purposes and objectives. Later, influenced by other notations, comparisons with other tools, or by standardization efforts...... to compare modelling notations and to make transformations between them. One of the reasons is that, in each notation, the new concepts are introduced in a different way by extending the already existing constructs. In this chapter, we go the opposite direction: We show that it is possible to add most...

  18. [Influence of traffic restriction on road and construction fugitive dust].

    Science.gov (United States)

    Tian, Gang; Li, Gang; Qin, Jian-Ping; Fan, Shou-Bin; Huang, Yu-Hu; Nie, Lei

    2009-05-15

    By monitoring the road and construction dust fall continuously during the "Good Luck Beijing" sport events, the reduction of road and construction dust fall caused by traffic restriction was studied. The contribution rate of road and construction dust to particulate matter of Beijing atmosphere environment, and the emission ratio of it to total local PM10 emission were analyzed. The results show that the traffic restriction reduces road and construction dust fall significantly. The dust fall average value of ring roads was 0.27 g x (m2 x d)(-1) in the "traffic restriction" period, and the values were 0.81 and 0.59 g x (m2 x d)(-1) 1 month and 7 days before. The dust fall average value of major arterial and minor arterial was 0.21 g x (m2 x d)(-1) in the "traffic restriction" period, and the values were 0.54 and 0.58 g x (m2 x d)(-1) 1 month and 7 days before. The roads emission reduced 60%-70% compared with before traffic restriction. The dust fall average values of civil architecture and utility architecture were 0.61 and 1.06 g x (m2 x d)(-1) in the "traffic restriction" period, and the values were 1.15 and 1.55 g x (m2 x d)(-1) 20 days before. The construction dust reduced 30%-47% compared with 20 days before traffic restriction. Road and construction dust emission are the main source of atmosphere particulate matter in Beijing, and its contribution to ambient PM10 concentration is 21%-36%. PM10 emitted from roads and constructions account for 42%-72% and 30%-51% of local emission while the local PM10 account for 50% and 70% of the total emission.

  19. APPLIED ORGANIZATION OF CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Kievskiy Leonid Vladimirovich

    2017-03-01

    Full Text Available Applied disciplines in the sphere of construction which are engaged in the solution of vital macroeconomical problems (the general trend of development of these disciplines is the expansion of problematics and mutual integration are considered. Construction organization characteristic at the present stage as a systems engineering discipline covering the investment process of creation of real estate items, is given. The main source of current research trends for applied sciences (socio-economic development forecasts, regional and local programs is determined. Interpenetration and integration of various fields of knowledge exemplified by the current interindustry problem of blocks renovation organization of existing development, is demonstrated. Mathematical model of wave construction (for the period of deployment is proposed. Nature of dependence of the total duration of renovation on the limit of annual input and coefficient of renovation, is established. Overall structure of the Moscow region housing market is presented, and approaches to definition of effective demand are proposed.

  20. Measuring mandibular ridge reduction

    International Nuclear Information System (INIS)

    Steen, W.H.A.

    1984-01-01

    This thesis investigates the mandibular reduction in height of complete denture wearers and overdenture wearers. To follow this reduction in the anterior region as well as in the lateral sections of the mandible, an accurate and reproducible measuring method is a prerequisite. A radiologic technique offers the best chance. A survey is given of the literature concerning the resorption process after the extraction of teeth. An oblique cephalometric radiographic technique is introduced as a promising method to measure mandibular ridge reduction. The reproducibility and the accuracy of the technique are determined. The reproducibility in the positioning of the mandible is improved by the introduction of a mandibular support which permits a precise repositioning of the edentulous jaw, even after long periods of investigation. (Auth.)

  1. Chemical model reduction under uncertainty

    KAUST Repository

    Najm, Habib; Galassi, R. Malpica; Valorani, M.

    2016-01-01

    We outline a strategy for chemical kinetic model reduction under uncertainty. We present highlights of our existing deterministic model reduction strategy, and describe the extension of the formulation to include parametric uncertainty in the detailed mechanism. We discuss the utility of this construction, as applied to hydrocarbon fuel-air kinetics, and the associated use of uncertainty-aware measures of error between predictions from detailed and simplified models.

  2. Chemical model reduction under uncertainty

    KAUST Repository

    Najm, Habib

    2016-01-05

    We outline a strategy for chemical kinetic model reduction under uncertainty. We present highlights of our existing deterministic model reduction strategy, and describe the extension of the formulation to include parametric uncertainty in the detailed mechanism. We discuss the utility of this construction, as applied to hydrocarbon fuel-air kinetics, and the associated use of uncertainty-aware measures of error between predictions from detailed and simplified models.

  3. Pairs of dual periodic frames

    DEFF Research Database (Denmark)

    Christensen, Ole; Goh, Say Song

    2012-01-01

    The time–frequency analysis of a signal is often performed via a series expansion arising from well-localized building blocks. Typically, the building blocks are based on frames having either Gabor or wavelet structure. In order to calculate the coefficients in the series expansion, a dual frame...... is needed. The purpose of the present paper is to provide constructions of dual pairs of frames in the setting of the Hilbert space of periodic functions L2(0,2π). The frames constructed are given explicitly as trigonometric polynomials, which allows for an efficient calculation of the coefficients...

  4. Construct ability Improvement for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dae Soo; Lee, Jong Rim; Kim, Jong Ku [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    The purpose of this study was to identify methods for improving the construct ability of nuclear power plants. This study reviewed several references of current construction practices of domestic and overseas nuclear plants in order to identify potential methods for improving construct ability. The identified methods for improving construct ability were then evaluated based on the applicability to domestic nuclear plant construction. The selected methods are expected to reduce the construction period, improve the quality of construction, cost, safety, and productivity. Selection of which methods should be implemented will require further evaluation of construction modifications, design changes, contract revisions. Among construction methods studied, platform construction methods can be applied through construction sequence modification without significant design changes, and Over the Top construction method of the NSSS, automatic welding of RCL pipes, CLP modularization, etc., are considered to be applied after design modification and adjustment of material lead time. (author). 49 refs., figs., tabs.

  5. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  6. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  7. Specific features of elite bodybuilders’ training process in competition period

    Directory of Open Access Journals (Sweden)

    A.A. Tihorsky

    2016-12-01

    Full Text Available Purpose: To substantiate methodic of training process construction for elite bodybuilders in competition period with usage of different training methods. Material: elite bodybuilders - members of combined team of Ukraine (n=16 participated in the research. Results: we presented comparative characteristic of the most often used bodybuilding training methodic. Besides, optimal training methodic in competition period was worked out and substantiated. Such methodic permits to improve body proportions at the account of fat layer reduction. By the data of Harvard step-test the sportsmen improved organism’s functional potentials by 6%. Conclusions: the offered methodic noticeably reduces probability of functional unfavorable states (over-training, overloading, traumas. The methodic permits to achieve the required sport form without over-tension adaptation-compensatory mechanisms and acquire maximal muscular relief; improve proportions with minimal losses of muscles’ volume.

  8. Snubber reduction

    International Nuclear Information System (INIS)

    Olson, D.E.; Singh, A.K.

    1986-01-01

    Many safety-related piping systems in nuclear power plants have been oversupported. Since snubbers make up a large percentage of the pipe supports or restraints used in a plant, a plant's snubber population is much larger than required to adequately restrain the piping. This has resulted in operating problems and unnecessary expenses for maintenance and inservice inspections (ISIs) of snubbers. This paper presents an overview of snubber reduction, including: the incentives for removing snubbers, a historical perspective on how piping became oversupported, why it is possible to remove snubbers, and the costs and benefits of doing so

  9. Time reduction in well construction with the addition of glass microspheres and thixotropic agents in cement slurries in zonal isolation at Solimoes Basin; Reducao do tempo de construcao de pocos de petroelo na Bacia do Solimoes atraves da utilizacao de microsferas de vidro e agentes tixotropicos nas fases de cimentacao

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, Cledeilson R.L.; Duque, Luis H.; Steffan, Rodolfo H.P.; Guimaraes, Zacarias [Baker Hyghes, Houston, TX (United States); Corregio, Fabio; Augusto, Marcelo; Mendes, Sandro C. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    One of the problems faced by the oil industry during the well construction is the damage effect of the hydrostatic head of cement slurries on unconsolidated reservoirs, trending to a necessity of lightweight cementing slurries with high resistance for zonal isolation. This paper presents experiences with lightweight cementing slurries obtained by the addition of glass microspheres and thixotropic agents in oil and gas wells located at Solimoes Basin - Amazon Basin, Brazil, which led to 100% time reduction on well construction when compared with the standard cementing procedures, besides the benefit of no reservoir damage. It also includes lab tests, cement slurry designs, case histories and results that allow a complete evaluation of the technique that can be applied in other similar environments. (author)

  10. Layout Construction

    DEFF Research Database (Denmark)

    Frandsen, Gudmund Skovbjerg; Palsberg, Jens; Schmidt, Erik Meineche

    We design a system for generating newspaper layout proposals. The input to the system consists of editorial information (text, pictures, etc) and style information (non-editorial information that specifies the aesthetic appearance of a layout). We consider the automation of layout construction...... to pose two main problems. One problem consists in optimizing the layout with respect to the constraints and preferences specified in the style information. Another problem consists in finding a representation of the style information that both supports its use in the combinatorial optimization...

  11. Toward an Organic Chemist's Periodic Table.

    Science.gov (United States)

    Hall, H. K., Jr.

    1980-01-01

    An analogy between electron transfer reactions of the elements and those of organic molecules is offered. Examples of organic electron transfer reactions are presented. The rationale of constructing an organic chemists' periodic table is also discussed. (HM)

  12. Advanced construction methods in ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Choy, E.; Yu, S.K.W.

    2002-01-01

    The ACR - Advanced CANDU Reactor, developed by Atomic Energy of Canada Limited (AECL), is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. This necessitated a much more comprehensive approach in including constructability considerations in the design to ensure that the construction duration is met. For the ACR-700, a project schedule of 48 months has been developed for the nth replicated unit with a 36 month construction period duration from First Concrete to Fuel Load. An overall construction strategy that builds on the success of the construction methods that are proven in the construction of the Qinshan CANDU 6 project has been developed for the ACR. The overall construction strategy comprises the 'Open Top' construction technique using a Very Heavy Lift crane, parallel construction activities, with extensive modularization and prefabrication. In addition, significant applications of up to date construction technology will be implemented, e.g. large volume concrete pours, prefabricated rebar, use of climbing forms, composite structures, prefabricated permanent formwork, automatic welding, and utilization of the latest electronic technology tools such as 3D CADDs modelling yields a very high quality, clash free product to allow construction to be completed 'right the first time' and eliminates rework. Integration of 3D CADDs models and scheduling tools such as Primavera has allowed development of actual construction sequences and an iterative approach to schedule verification and improvement. Modularization and prefabrication are major features of the ACR design in order to achieve the project schedule. For the reactor building approximately 80% of the volume will be installed as modules or prefabricated assembles. This ensures critical path activities are achieved. This paper examines the advanced construction methods implemented in the design in order to

  13. 从麦金太尔的德性理论谈新时期我国体育职业道德建设%Enlightenment of sports professional ethics construction in the new period of China from MacIntyre's virtue theory

    Institute of Scientific and Technical Information of China (English)

    樊云庆; 曹景川

    2016-01-01

    德性的缺乏是导致新时期我国体育职业道德问题层出不穷的原因之一,而麦金太尔的德性论为解决体育职业道德问题提供了新的思路。从德性理论的概述出发,系统介绍了新时期我国体育职业道德建设的成就及职业道德缺失的现实问题,结合德性理论的实践、人生统一性与传统三大观点,探讨了德性理论对新时期我国体育职业道德建设的深刻启示,构建与我国现代社会经济条件相适应的职业道德体系。%In the new period,virtue deficiency is the fundamental reason leading to the increasingly serious sports moral issues in China,However,Macintyre's virtue theory offers a new idea to solve the sports professional ethic issues.Starting from an overview of virtue theory, this paper systematicly introduced the achievements of the sports professional ethics construction and the practical problems of virtue deficiency in the new period of China. With the combination of three viewpoints of the practice of virtue theory,lifetime unity and tradition,it discussed the profound enlightenment of virtue theory for the sports professional ethics construction in the new period of China,so as to establish a suitable professional ethic system fitting in the social and economic condition of China.

  14. Evolution of periodicity in periodical cicadas.

    Science.gov (United States)

    Ito, Hiromu; Kakishima, Satoshi; Uehara, Takashi; Morita, Satoru; Koyama, Takuya; Sota, Teiji; Cooley, John R; Yoshimura, Jin

    2015-09-14

    Periodical cicadas (Magicicada spp.) in the USA are famous for their unique prime-numbered life cycles of 13 and 17 years and their nearly perfectly synchronized mass emergences. Because almost all known species of cicada are non-periodical, periodicity is assumed to be a derived state. A leading hypothesis for the evolution of periodicity in Magicicada implicates the decline in average temperature during glacial periods. During the evolution of periodicity, the determinant of maturation in ancestral cicadas is hypothesized to have switched from size dependence to time (period) dependence. The selection for the prime-numbered cycles should have taken place only after the fixation of periodicity. Here, we build an individual-based model of cicadas under conditions of climatic cooling to explore the fixation of periodicity. In our model, under cold environments, extremely long juvenile stages lead to extremely low adult densities, limiting mating opportunities and favouring the evolution of synchronized emergence. Our results indicate that these changes, which were triggered by glacial cooling, could have led to the fixation of periodicity in the non-periodical ancestors.

  15. Purchasing management experience of Haiyang nuclear power project construction period

    International Nuclear Information System (INIS)

    Ma Yuqin

    2013-01-01

    Purchasing is one of the important aspects to ensure the safety and quality of the nuclear power plant. This paper, combining the purchasing peculiarity and purchasing process of Haiyang nuclear power project, summarizes experiences of Haiyang nuclear power project in promoting its purchasing management level in aspects of purchasing method choosing, purchasing plan management, purchasing process optimization, purchasing contract implementation and purchasing surveillance, etc. (author)

  16. Radon reduction

    International Nuclear Information System (INIS)

    Hamilton, M.A.

    1990-01-01

    During a radon gas screening program, elevated levels of radon gas were detected in homes on Mackinac Island, Mich. Six homes on foundations with crawl spaces were selected for a research project aimed at reducing radon gas concentrations, which ranged from 12.9 to 82.3 pCi/l. Using isolation and ventilation techniques, and variations thereof, radon concentrations were reduced to less than 1 pCi/l. This paper reports that these reductions were achieved using 3.5 mil cross laminated or 10 mil high density polyethylene plastic as a barrier without sealing to the foundation or support piers, solid and/or perforated plastic pipe and mechanical fans. Wind turbines were found to be ineffective at reducing concentrations to acceptable levels. Homeowners themselves installed all materials

  17. Periodic Table Target: A Game that Introduces the Biological Significance of Chemical Element Periodicity

    Science.gov (United States)

    Sevcik, Richard S.; McGinty, Ragan L.; Schultz, Linda D.; Alexander, Susan V.

    2008-01-01

    Periodic Table Target, a game for middle school or high school students, familiarizes students with the form of the periodic table and the biological significance of different elements. The Periodic Table Target game board is constructed as a class project, and the game is played to reinforce the content. Students are assigned several elements…

  18. 36 CFR 14.29 - Timely construction.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Timely construction. 14.29...-OF-WAY Procedures § 14.29 Timely construction. (a) Unless otherwise provided by law, a period of up to five years from the date a right-of-way is granted is allowed for completion of construction...

  19. Reduction of construction cost and carbon dioxide emissions by heat contracting. Obstacles and solutions. Final report; Baukostensenkung und CO{sub 2}-Minderung durch Waerme-Contracting. Hemmnisse und Loesungswege. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ebert, V.; Liebernickel, T.; Froemel, T.; Kues, H.

    2000-11-01

    The poor condition of many heating systems is caused by a conflict of interest between investors and users. Landlords tended to opt for low investment cost, while the accompanying higher consumption cost was paid by their tenants. The only thing that has changed here is the fact that the 'secondary cost' has become a criterion for new tenants' decision to rent an apartment. Heat contracting may be a way out of the problem as contractors are interested in high-efficiency heating systems and optimally controlled operation. Heat contracting is a service concept of private and communal organisations that involves payment, construction and operation of a heating system by the contractor depending on the contracting model used. [German] Die relativ schlechte und veraltete heizungstechnische Ausruestung der Wohngebaeude in Deutschland ist auf den lange Jahre bestehenden Interessenkonflikt zwischen Investor und Nutzer im Mietwohnungsbau zurueckzufuehren. Durch die Umlagefaehigkeit der Heizkosten auf die Nutzer (Mieter) war der Gebaeudeeigentuemer i.d.R. bestrebt, eine Anlage zu guenstigen Investitionskosten zu erwerben. Die daraus resultierenden, relativ hoeheren Verbrauchskosten waren als Betriebskosten auf die Mieter umlegbar und belasteten den Vermieter nicht. An dieser Situation hat sich bis heute prinzipiell nichts geaendert; allerdings sind die Nebenkosten mit der Hauptkostenposition 'Heizkosten' zu einem Kriterium der Vermietbarkeit geworden, so dass der Vermieter heute die Kosten moeglichst niedrig halten muss. Ein Ausweg aus dem Interessenkonflikt und der neuen Vermietsituation koennte das Waerme-Contracting sein. Seitens des Contractors ist der Einsatz hocheffizienter Anlagentechnik und optimale, d.h. ueberwachte Betriebsbedingungen fuer einen wirtschaftlichen Erfolg unabdingbar. Waerme-Contracting ist ein Dienstleistungskonzept von privatwirtschaftlichen und kommunalen Unternehmen, die - je nach Contracting

  20. Inflation from periodic extra dimensions

    Energy Technology Data Exchange (ETDEWEB)

    Higaki, Tetsutaro [Department of Physics, Keio University, Kanagawa 223-8522 (Japan); Tatsuta, Yoshiyuki, E-mail: thigaki@rk.phys.keio.ac.jp, E-mail: y_tatsuta@akane.waseda.jp [Department of Physics, Waseda University, Tokyo 169-8555 (Japan)

    2017-07-01

    We discuss a realization of a small field inflation based on string inspired supergravities. In theories accompanying extra dimensions, compactification of them with small radii is required for realistic situations. Since the extra dimension can have a periodicity, there will appear (quasi-)periodic functions under transformations of moduli of the extra dimensions in low energy scales. Such a periodic property can lead to a UV completion of so-called multi-natural inflation model where inflaton potential consists of a sum of multiple sinusoidal functions with a decay constant smaller than the Planck scale. As an illustration, we construct a SUSY breaking model, and then show that such an inflaton potential can be generated by a sum of world sheet instantons in intersecting brane models on extra dimensions containing orbifold. We show also predictions of cosmic observables by numerical analyzes.

  1. Periodicity, the Canon and Sport

    Directory of Open Access Journals (Sweden)

    Thomas F. Scanlon

    2015-10-01

    Full Text Available The topic according to this title is admittedly a broad one, embracing two very general concepts of time and of the cultural valuation of artistic products. Both phenomena are, in the present view, largely constructed by their contemporary cultures, and given authority to a great extent from the prestige of the past. The antiquity of tradition brings with it a certain cachet. Even though there may be peripheral debates in any given society which question the specifics of periodization or canonicity, individuals generally accept the consensus designation of a sequence of historical periods and they accept a list of highly valued artistic works as canonical or authoritative. We will first examine some of the processes of periodization and of canon-formation, after which we will discuss some specific examples of how these processes have worked in the sport of two ancient cultures, namely Greece and Mesoamerica.

  2. Unit soil loss rate from various construction sites during a storm.

    Science.gov (United States)

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  3. Lung cancer risk among construction workers in California, 1988-2007.

    Science.gov (United States)

    Calvert, Geoffrey M; Luckhaupt, Sara; Lee, Soo-Jeong; Cress, Rosemary; Schumacher, Pam; Shen, Rui; Tak, SangWoo; Deapen, Dennis

    2012-05-01

    Although lung cancer risks can vary by race/ethnicity and by construction occupation, these risks have not been examined extensively. This study analyzed 110,937 lung cancer cases identified from the California Cancer Registry between 1988 and 2007. Mean age at diagnosis, proportion diagnosed at an advanced stage, and proportion with 3-year survival were calculated for lung cancer cases employed in the construction industry. Case-control methodology was also used to assess the risk of lung cancer. Morbidity odds ratios (MORs) were estimated by conditional logistic regression. Construction workers were found to have a significantly elevated risk for all lung cancer combined (MOR = 1.57) and for each lung cancer histologic subtype examined. All construction occupations, except managers/engineers and supervisors, had a significantly elevated risk for all lung cancer combined. Roofers and welders had the highest risks for total lung cancer and for each of the histologic subtypes. Construction workers in each of the four race/ethnicity groups also had significantly increased lung cancer risks. Compared to non-construction workers, construction workers were diagnosed at an earlier age, at a more advanced stage, and had significantly lower 3-year survival, though differences were modest. These findings justify additional reductions in carcinogenic exposures in construction, and increased support for smoking cessation programs at construction sites. Copyright © 2012 Wiley Periodicals, Inc.

  4. Nuclear power generation as seen from construction aspect

    International Nuclear Information System (INIS)

    Osaki, Yorihiko

    1984-01-01

    The measures to vitalize atomic energy industry in low economical growth age are grasped from the viewpoint of heightening the quality of technology, and the improvement of the economical efficiency of nuclear power generation as seen from construction aspect is discussed. By 2000, the nuclear power generation in Japan will be increased by about four times to 62 million kW, and the proportion of nuclear power increases steadily. Recently, the nuclear power stations in Japan have been stably operated at high level, and the capacity ratio has exceeded 70 %. However, the power generation cost tends to rise, and it is feared that the economical advantage over thermal power will be lost. Recently, the construction cost of nuclear power plants has continued to rise, which causes the high cost of nuclear power. The reason of the high construction cost is in short too much quantity of materials and long construction period. As the proposal to reduce the construction cost, three stages of the rationalization are discussed, such as the rationalization of simulated earthquake for design and the improvement of reactor building design. The promotion of technical development is indispensable for the cost reduction. (Kako, I.)

  5. Japanese experience in nuclear power plant construction

    International Nuclear Information System (INIS)

    Seko, T.

    1989-01-01

    Development of LWR in JAPAN started by introducing LWR from the U.S.A. Since then we have been improving existing technology and promoting domestic technology development based on experiences accumulated in Japan. As a result, recent operating performance has been excellent. As far as construction work is concerned, we also have been making our best efforts to improve the performance of construction work itself, with the cooperation of manufacturers. As for construction work, we have succeeded in improving the quality of construction work, shortening the construction period and reducing construction costs through new technology and Japanese-style work management

  6. Construction materials and Radon

    International Nuclear Information System (INIS)

    Paschuk, Sergei A.; Correa, Janine Nicolosi; Loriane, Fior; Schelin, Hugo R.; Pottker, Fabiana; Paula Melo, Vicente de

    2008-01-01

    Full text: Current studies have been performed with the aim to find the correlation of radon concentration in the air and used construction materials. At the first stage of the measurements different samples of materials used in civil construction were studied as a source of radon in the air and at the second step it was studied the radon infiltration insulation using different samples of finishing materials. For 222 Rn concentration measurements related to different construction materials as well as for the studies of radon emanation and its reduction, the sealed cell chambers, of approximately 60 x 60cm 2 , have been built using the ceramic and concrete blocks. This construction has been performed within protected and isolated laboratory environment to maintain the air humidity and temperature stable. These long term measurements have been performed using polycarbonate alpha track passive detectors. The exposure time was set about 15 days considering previous calibration performed at the Institute of Radiation Protection and Dosimetry (IRD/CNEN), where the efficiency of 70% was obtained for the density of alpha particle tracks about 13.8 cm -2 per exposure day and per kBq/m 3 of radon activity concentration. The chemical development of alpha tracks has been achieved by electrochemical etching. The track identification and counting have been done using a code based on the MATLAB Image Processing Toolbox. The cell chambers have been built following four principle steps: 1) Assembling the walls using the blocks and mortar; 2) Plaster installation; 3) Wall surface finishing using the lime; 4) Wall surface insulation by paint. Making the comparison between three layers installed at the masonry walls from concrete and ceramic blocks, it could be concluded that only wall painting with acrylic varnish attended the expectation and reduced the radon emanation flow by the factor of 2.5 approximately. Studied construction materials have been submitted the instant

  7. An algorithm for reduct cardinality minimization

    KAUST Repository

    AbouEisha, Hassan M.

    2013-12-01

    This is devoted to the consideration of a new algorithm for reduct cardinality minimization. This algorithm transforms the initial table to a decision table of a special kind, simplify this table, and use a dynamic programming algorithm to finish the construction of an optimal reduct. Results of computer experiments with decision tables from UCI ML Repository are discussed. © 2013 IEEE.

  8. An algorithm for reduct cardinality minimization

    KAUST Repository

    AbouEisha, Hassan M.; Al Farhan, Mohammed; Chikalov, Igor; Moshkov, Mikhail

    2013-01-01

    This is devoted to the consideration of a new algorithm for reduct cardinality minimization. This algorithm transforms the initial table to a decision table of a special kind, simplify this table, and use a dynamic programming algorithm to finish the construction of an optimal reduct. Results of computer experiments with decision tables from UCI ML Repository are discussed. © 2013 IEEE.

  9. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  10. Engineering development in nuclear power plant construction

    International Nuclear Information System (INIS)

    Guenther, P.

    1979-01-01

    Proceeding from the up-to-now experience in the erection of nuclear power stations, especially of the first and second unit of the Greifswald nuclear power plant, the following essential aspects of the development of constructional engineering are discussed: (1) constructional features and criteria, (2) organizational management, (3) current status and problems in prelimary operations, and (4) possibilities of further expenditure reductions in constructing nuclear power stations

  11. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  12. Periodic and quasiperiodic revivals in periodically driven interacting quantum systems

    Science.gov (United States)

    Luitz, David J.; Lazarides, Achilleas; Bar Lev, Yevgeny

    2018-01-01

    Recently it has been shown that interparticle interactions generically destroy dynamical localization in periodically driven systems, resulting in diffusive transport and heating. In this Rapid Communication we rigorously construct a family of interacting driven systems which are dynamically localized and effectively decoupled from the external driving potential. We show that these systems exhibit tunable periodic or quasiperiodic revivals of the many-body wave function and thus of all physical observables. By numerically examining spinless fermions on a one-dimensional lattice we show that the analytically obtained revivals of such systems remain stable for finite systems with open boundary conditions while having a finite lifetime in the presence of static spatial disorder. We find this lifetime to be inversely proportional to the disorder strength.

  13. Periodic solutions of nonlinear vibrating beams

    Directory of Open Access Journals (Sweden)

    J. Berkovits

    2003-01-01

    Full Text Available The aim of this paper is to prove new existence and multiplicity results for periodic semilinear beam equation with a nonlinear time-independent perturbation in case the period is not prescribed. Since the spectrum of the linear part varies with the period, the solvability of the equation depends crucially on the period which can be chosen as a free parameter. Since the period of the external forcing is generally unknown a priori, we consider the following natural problem. For a given time-independent nonlinearity, find periods T for which the equation is solvable for any T-periodic forcing. We will also deal with the existence of multiple solutions when the nonlinearity interacts with the spectrum of the linear part. We show that under certain conditions multiple solutions do exist for any small forcing term with suitable period T. The results are obtained via generalized Leray-Schauder degree and reductions to invariant subspaces.

  14. Industrial Disputes in the Construction Sector

    Directory of Open Access Journals (Sweden)

    L.J Perry

    2012-11-01

    Full Text Available The Cole Royal Commission enquiry into the building and construction (abbreviated to ‘construction’ sector recommended controversial workplace-relation reforms for that sector. The recommended changes are likely to be enshrined in legislation within the year. The Commission drew on analyses of industrial disputes that focused, in the main, on quite recent experience. This paper attempts to give a broader historical perspective on disputes in that sector by considering the pattern of disputes for the entire post-World War II period. Accordingly, data on disputes and employees during the entire period are gathered from Australian Bureau of Statistics current and archived sources. These data are classified according to sector (construction versus non-construction and analysed. It is found that the strike rate has, on average, been greater in the construction sector than in the non-construction sector. However, there have been periods during which disputes in the construction sector have been relatively low. The most recent period was during the period of the Accord (1983-96, during which the strike rate in the construction sector fell relatively strongly. The analysis of this relatively broad historical period draws attention, among other things, to the possibility that the sort of strategies employed during the Accord years – strategies of cooperation and consensus building – may provide a more effective means of bringing industrial peace to the workplace relations scene of the construction sector than policies that are relatively confrontational.

  15. Development of new construction technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Kawamata, Susumu; Itoh, Daisuke; Ichizono, Katsuyuki

    1995-01-01

    In order to proceed rationally with the construction of a nuclear power station, the followings are the subject to solve beside reducing the construction cost: shortening the construction period, improving the quality, and securing safety in the construction work. As a measure to solve the matters, we correctly construct the plant mainly applying 'all-weather proof construction method' and 'pre-assembled large-block construction method'. Furthermore, as the plant construction control system, we perform a construction work applying the design change management system, pre-assessment for safety, and the whole facility check. As a result of our effort, it was attained that when we compare the matured plant with the first unit, the construction cost is reduced by 30%, the construction period is shortened by 12 months, site manpower is decreased by 30%, and the plant had no sudden shutdowns even during the trial operation period. (author)

  16. Experimental study on rapid embankment construction methods

    International Nuclear Information System (INIS)

    Hirano, Hideaki; Egawa, Kikuji; Hyodo, Kazuya; Kannoto, Yasuo; Sekimoto, Tsuyoshi; Kobayashi, Kokichi.

    1982-01-01

    In the construction of a thermal or nuclear power plant in a coastal area, shorter embankment construction period has come to be called for recently. This tendency is remarkable where construction period is limited due to meteorological or sea conditions. To meet this requirement, the authors have been conducting basic experimental studies on two methods for the rapid execution of embankment construction, that is, Steel Plate Cellular Bulkhead Embedding Method and Ship Hull Caisson Method. This paper presents an outline of the results of the experimental study on these two methods. (author)

  17. An alternative dimensional reduction prescription

    International Nuclear Information System (INIS)

    Edelstein, J.D.; Giambiagi, J.J.; Nunez, C.; Schaposnik, F.A.

    1995-08-01

    We propose an alternative dimensional reduction prescription which in respect with Green functions corresponds to drop the extra spatial coordinate. From this, we construct the dimensionally reduced Lagrangians both for scalars and fermions, discussing bosonization and supersymmetry in the particular 2-dimensional case. We argue that our proposal is in some situations more physical in the sense that it maintains the form of the interactions between particles thus preserving the dynamics corresponding to the higher dimensional space. (author). 12 refs

  18. The Periodic Pyramid

    Science.gov (United States)

    Hennigan, Jennifer N.; Grubbs, W. Tandy

    2013-01-01

    The chemical elements present in the modern periodic table are arranged in terms of atomic numbers and chemical periodicity. Periodicity arises from quantum mechanical limitations on how many electrons can occupy various shells and subshells of an atom. The shell model of the atom predicts that a maximum of 2, 8, 18, and 32 electrons can occupy…

  19. Book Reviews in Periodicals.

    Science.gov (United States)

    Ettelt, Harold J.

    All recent issues of periodicals found which contain indexed book reviews are listed in this compilation from Drake Memorial Library at the New York State University at Brockport. The periodicals are listed by 29 subject headings in this informal guide designed to be used at Drake Library. The number of reviews in the periodical in a recent year…

  20. Radon reduction using sub floor fans

    International Nuclear Information System (INIS)

    Harley, N.H.; Chittaporn, P.

    1996-01-01

    The basement and second floor 222 Rn concentrations in an energy efficient home were measured hourly for 6 y using continuous monitors of our design. The home had a subslab pipe network installed during construction, and for the past 2 y a 150 cfm fan was operative venting air via ductwork inside the chimney exiting on the roof. During this measurement interval, experiments were conducted with the fan in 3 modes: (1) with the subslab fan off, (2) in the conventional direction auctioning air from beneath the slab to outside, and (3) reversed, blowing outdoor air into the network under the slab. We have a large data base to show that the indoor 222 R n concentration varies inversely with the indoor/outdoor temperature difference. In order to compare the 3 fan modes directly, we selected 50 to 90 d periods when the outdoor temperature was essentially the same. For the 3 modes, the fan off, blowing upward, and blowing downward, the basement concentration averaged 80, 38, and 34 Bq m -3 , respectively. Radon peaks or surges occur over a period of about 1 d during falling barometric pressure. With the fan blowing downward, these 222 Rn peaks tend to be smaller but only marginally so. We conclude that in this home the reduction in 222 Rn with the fan and subslab pipe network operating was essentially the same regardless of the direction of flow from the fan

  1. Advanced Construction of Compact Containment BWR

    International Nuclear Information System (INIS)

    Takahashi, M.; Maruyama, T.; Mori, H.; Hoshino, K.; Hijioka, Y.; Heki, H.; Nakamaru, M.; Hoshi, T.

    2006-01-01

    fabricate and perform pressure-test at the factory and transport to the construction-site as a module. Basing on CCR design concept of simplification and compact, reactor building layout design has been carried out. Layout design has been performed taking into account module construction, reduced system and components and compact PCV. As a result, CCR's reactor building, specific volume to power output value is almost equal to ABWR one. Module fabrication and construction method is promising technology from the points of construction duration shortening and construction cost reduction. Electrical equipment are piled up to multi-layer and connected and tested at the factory and transported to the construction-site in one module. Other equipment rooms and areas are also built into the various pre-fabricated module types in CCR construction. The construction of the CCR by the large module is planned to achieve only 24-month construction period from bedrock inspection to commercial operation. The CCR has possibilities of attaining both economical and safe small reactor by simplified system and compact PCV technologies with advanced construction. (authors)

  2. On almost-periodic points of a topological Markov chain

    International Nuclear Information System (INIS)

    Bogatyi, Semeon A; Redkozubov, Vadim V

    2012-01-01

    We prove that a transitive topological Markov chain has almost-periodic points of all D-periods. Moreover, every D-period is realized by continuously many distinct minimal sets. We give a simple constructive proof of the result which asserts that any transitive topological Markov chain has periodic points of almost all periods, and study the structure of the finite set of positive integers that are not periods.

  3. Constructibility assessment of APR1400

    International Nuclear Information System (INIS)

    Cho, Sung Jae; Kang, Yong Chul; Lee, Jae Gon; Lim, Woo Sang

    2003-01-01

    APR1400 (formerly KNGR) development is one of national G-7 projects sponsored by government and KHNP (Korea Hydro and Nuclear Power Co., LTD). It is an evolutionary standard reactor with the thermal output of 4000MWt and has been adopted for Shin-Kori Unit 3 and 4. The government organizations, research institutes, universities and industries have participated in the project since 1992 along with KHNP, and the standard design certification program was issued in May 2002. The project set up the top-tier requirements about the safety, economy, operability and maintainability, and constructibility in the early design stage. The requirements have been evaluated periodically during the design process, and the results were reflected to the design. This paper describes the methods for constructibility enhancement and the results of schedule analysis to assure meeting construction duration target, which is set to 48 months from the first concrete pouring to the commercial operation on the condition that learning effects are maximized at Nth plant. To meet the target schedule, the design characteristics and constructibility studies such as new construction methods and construction schedule analysis were performed. The new construction methods presented here are over the top method for NSSS components, deck plate and steel from for concrete wall and slab, automatic welding for large bore piping, and modularization of components and structure, etc. (author)

  4. Collapse simulation of building constructions

    Directory of Open Access Journals (Sweden)

    Nekrest'yanov Viktor Nikolaevich

    Full Text Available The physical reasons for building structures destruction are both the forces arising at stress-strain state of construction elements and external influences arising at emergency situations, as well as their moments, impulses and periodic impulses with the frequencies close to of fluctuations frequencies of construction elements. We shall call the mathematical calculation models for the parameters-reasons of destructions the basic models. The basic models of destruction of building structures elements allow not only providing necessary level of reliability and survivability of the elements and the construction as a whole already at the stage of their design, but also giving the chance, at their corresponding completion, to provide rational decisions on the general need of recovery works and their volume depending on destruction level. Especially important for rational design decisions development, which ensure the demanded constructional safety of building structures, is library creation of the basic mathematical models of standard processes of bearing elements destructions for standard construction designs for the purpose of the further forecast (assessment of the level and probabilities of standard destructions. Some basic mathematical models of destructions processes of the standard elements of building structures are presented in the present article. A model of accounting for construction defects and a model of obtaining requirements to probabilities of partial destructions of a construction are given. Both of these models are probabilistic.

  5. Constructing Aligned Assessments Using Automated Test Construction

    Science.gov (United States)

    Porter, Andrew; Polikoff, Morgan S.; Barghaus, Katherine M.; Yang, Rui

    2013-01-01

    We describe an innovative automated test construction algorithm for building aligned achievement tests. By incorporating the algorithm into the test construction process, along with other test construction procedures for building reliable and unbiased assessments, the result is much more valid tests than result from current test construction…

  6. Perspectives of construction robots

    Science.gov (United States)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  7. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  8. Non-shoring construction for T/G pedestal beams

    International Nuclear Information System (INIS)

    Abe, T.

    1992-01-01

    The T/G pedestal construction work has been the critical path within the T/B construction work of BWR type nuclear power plant. In order to meet the requirement of shortening the construction period and improved in safety on a Turbine Building (T/B) construction work, Non-soring construction for T/G Pedestal Beams was developed. By applying this method to T/G pedestal construction work, we succeeded in shortening the T/B construction period and improvement in safety significantly. (author)

  9. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  10. Painful menstrual periods

    Science.gov (United States)

    Menstruation - painful; Dysmenorrhea; Periods - painful; Cramps - menstrual; Menstrual cramps ... into two groups, depending on the cause: Primary dysmenorrhea Secondary dysmenorrhea Primary dysmenorrhea is menstrual pain that ...

  11. Middle Helladic Period

    DEFF Research Database (Denmark)

    Sarri, Kalliopi

    1999-01-01

    and their quality was improved considerably toward the end of this period. The profound cultural innovations of the Middle Helladic period were initially interpreted as a result of violent population movement and troubles provoked by the coming of the first Indo-European races. However, this matter does no more...... Helladic period is considered as a period of economic and social decline it was the time during which the mainland features merged with the insular influence, that is all the Aegean elements which led to the creation of the Mycenaean civilization were mixed in a creative way....

  12. Discrete Routh reduction

    International Nuclear Information System (INIS)

    Jalnapurkar, Sameer M; Leok, Melvin; Marsden, Jerrold E; West, Matthew

    2006-01-01

    This paper develops the theory of Abelian Routh reduction for discrete mechanical systems and applies it to the variational integration of mechanical systems with Abelian symmetry. The reduction of variational Runge-Kutta discretizations is considered, as well as the extent to which symmetry reduction and discretization commute. These reduced methods allow the direct simulation of dynamical features such as relative equilibria and relative periodic orbits that can be obscured or difficult to identify in the unreduced dynamics. The methods are demonstrated for the dynamics of an Earth orbiting satellite with a non-spherical J 2 correction, as well as the double spherical pendulum. The J 2 problem is interesting because in the unreduced picture, geometric phases inherent in the model and those due to numerical discretization can be hard to distinguish, but this issue does not appear in the reduced algorithm, where one can directly observe interesting dynamical structures in the reduced phase space (the cotangent bundle of shape space), in which the geometric phases have been removed. The main feature of the double spherical pendulum example is that it has a non-trivial magnetic term in its reduced symplectic form. Our method is still efficient as it can directly handle the essential non-canonical nature of the symplectic structure. In contrast, a traditional symplectic method for canonical systems could require repeated coordinate changes if one is evoking Darboux' theorem to transform the symplectic structure into canonical form, thereby incurring additional computational cost. Our method allows one to design reduced symplectic integrators in a natural way, despite the non-canonical nature of the symplectic structure

  13. Reduction of U3O8 to U by a metallic reductant, Li

    International Nuclear Information System (INIS)

    Jin-Mok Hur; Sun-Seok Hong; Hansoo Lee

    2010-01-01

    Reduction of U 3 O 8 was investigated for the recycling of spent oxide fuel from a commercial nuclear power plant. The possible reduction methods were proposed and compared. Based on the thermodynamic analysis, Li metal was selected as a reductant. The optimum reaction temperature for the reduction of U 3 O 8 was investigated at the wider reaction temperature range. The adverse oxidation of U metal by Li 2 O at 1,000 deg C was experimentally verified. Ellingham diagram was constructed to investigate the extent of the uranium oxides reduction when the reaction was carried out above melting point of U metal. (author)

  14. Concrete construction engineering handbook

    CERN Document Server

    Nawy, Edward G

    2008-01-01

    Provides coverage of concrete construction engineering and technology. This work features discussions focusing on: the advances in engineered concrete materials; reinforced concrete construction; specialized construction techniques; and, design recommendations for high performance.

  15. Streamlined project closeout for construction at KYTC.

    Science.gov (United States)

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  16. INDOT Construction Inspection Priorities : Technical Summary

    Science.gov (United States)

    2012-05-01

    In the last decade, the Indiana Department of Transportation (INDOT) increased the number of construction projects funded by capital made available through the leasing of the Indiana Toll Road. However, during the same time period, the level of perso...

  17. Finding optimal exact reducts

    KAUST Repository

    AbouEisha, Hassan M.

    2014-01-01

    The problem of attribute reduction is an important problem related to feature selection and knowledge discovery. The problem of finding reducts with minimum cardinality is NP-hard. This paper suggests a new algorithm for finding exact reducts

  18. Construction and testing of JT-60

    International Nuclear Information System (INIS)

    Kishimoto, H.; Aikawa, H.; Oikawa, A.; Miya, N.; Suzuki, K.; Ozeki, T.; Tokutake, T.; Kunieda, S.; Hiruta, K.; Hosoda, R.

    1987-01-01

    The JT-60 project is reviewed in terms of design, R and D, construction, commissioning and project management. Design features of JT-60 have been refined and renewed through periodic assessments. Engineering targets have been achieved by R and D efforts. Construction and commissioning have progressed on schedule with intensive project management and control. JT-60 obtained high performance and has entered into the experimental phase after completion of machine construction. (orig.)

  19. On some periodicity effects

    DEFF Research Database (Denmark)

    Sorokin, Sergey V.

    2015-01-01

    The talk is concerned with the modelling of wave propagation in and vibration of periodic elastic structures. Although analysis of wave-guide properties of infinite periodic structures is a well establish research subject, some issues have not yet been fully addressed in the literature. The aim o...

  20. The Living Periodic Table

    Science.gov (United States)

    Nahlik, Mary Schrodt

    2005-01-01

    To help make the abstract world of chemistry more concrete eighth-grade students, the author has them create a living periodic table that can be displayed in the classroom or hallway. This display includes information about the elements arranged in the traditional periodic table format, but also includes visual real-world representations of the…

  1. Reprint Series: Geometric Constructions. RS-10.

    Science.gov (United States)

    Schaaf, William L., Ed.

    This is one in a series of SMSG supplementary and enrichment pamphlets for high school students. The series makes available expository articles which appeared in a variety of mathematical periodicals. Topics covered include: (1) Euclidean constructions; (2) the geometry of the fixed compass; (3) certain topics related to constructions with…

  2. Breast Reduction Surgery

    Science.gov (United States)

    ... considering breast reduction surgery, consult a board-certified plastic surgeon. It's important to understand what breast reduction surgery entails — including possible risks and complications — as ...

  3. Growth and poverty reduction in Tanzania

    DEFF Research Database (Denmark)

    Arndt, Channing; Demery, Lionel; McKay, Andy

    . The household survey data documents a limited reduction in consumption poverty over the period, and what poverty reduction there has been has mostly occurred in Dar es Salaam. Indicators of non-monetary poverty have gradually improved over the past 20 years but significant differences across the country remain....

  4. Short-term effects of the construction of wind turbines on harbour porpoises at Horns Reef

    Energy Technology Data Exchange (ETDEWEB)

    Tougaard, J. [Hedeselskabet, Miljoe og Energi A/S, Viborg(Denmark); Carstensen, Jakob [National Environmental Res. Inst., Dept. of Marine Ecology, Roskidle (Denmark); Damsgaard Henriksen, O.; Teilmann, J. [National Environmental Res. Inst., Dept. of Arctic Biology, Roskilde (Denmark)

    2003-04-15

    In 2002 the Worlds largest offshore wind farm, consisting of 80 2MW wind turbines, was constructed on Horns Reef in the Danish North Sea. Ship based visual surveys and long-term deployment of acoustic dataloggers (PODs) were used to assess short term effects of construction on behaviour and abundance of harbour porpoises (Phocoena phocoena). Most focus was put on mounting of steel monopile foundations for the turbines, as they were rammed into the seabed. This type of operation is known to generate very loud underwater sound levels. Combined evidence from animal densities obtained from visual surveys, behavioural observations during surveys and acoustic activity data in and outside the construction area demonstrated effects on the behaviour and abundance of animals on both short-term (hours) and long term (entire construction period) scales. Acoustic activity by the porpoises decreased dramatically on the entire Horns Reef at the onset of ramming operations and returned to higher levels a few hours after each ramming operation was completed. A reduction in abundance close to ramming operations was anticipated, as deterring devices (pingers and seal scarers) were deployed prior to each ramming operation to deter marine mammals from the area and thus protect them from exposure to the loud sound levels generated by the ramming procedure. The changes in abundance and behaviour over large distances are unlikely to be explained by the deterring sounds, which have comparably lower intensities than the ramming sounds and these effects must be attributed to the ramming. A general effect on the behaviour of animals was seen during the construction period and at distances of up to 10-15 kilometers from the construction site. Compared to observations before and after construction there was a decrease in non-directional swimming, a behaviour assumed to correlate with feeding activity. Animal density estimates indicates that there were fewer animals present on the entire Horns

  5. Short-term effects of the construction of wind turbines on harbour porpoises at Horns Reef

    International Nuclear Information System (INIS)

    Tougaard, J.; Carstensen, Jakob; Damsgaard Henriksen, O.; Teilmann, J.

    2003-04-01

    In 2002 the Worlds largest offshore wind farm, consisting of 80 2MW wind turbines, was constructed on Horns Reef in the Danish North Sea. Ship based visual surveys and long-term deployment of acoustic dataloggers (PODs) were used to assess short term effects of construction on behaviour and abundance of harbour porpoises (Phocoena phocoena). Most focus was put on mounting of steel monopile foundations for the turbines, as they were rammed into the seabed. This type of operation is known to generate very loud underwater sound levels. Combined evidence from animal densities obtained from visual surveys, behavioural observations during surveys and acoustic activity data in and outside the construction area demonstrated effects on the behaviour and abundance of animals on both short-term (hours) and long term (entire construction period) scales. Acoustic activity by the porpoises decreased dramatically on the entire Horns Reef at the onset of ramming operations and returned to higher levels a few hours after each ramming operation was completed. A reduction in abundance close to ramming operations was anticipated, as deterring devices (pingers and seal scarers) were deployed prior to each ramming operation to deter marine mammals from the area and thus protect them from exposure to the loud sound levels generated by the ramming procedure. The changes in abundance and behaviour over large distances are unlikely to be explained by the deterring sounds, which have comparably lower intensities than the ramming sounds and these effects must be attributed to the ramming. A general effect on the behaviour of animals was seen during the construction period and at distances of up to 10-15 kilometers from the construction site. Compared to observations before and after construction there was a decrease in non-directional swimming, a behaviour assumed to correlate with feeding activity. Animal density estimates indicates that there were fewer animals present on the entire Horns

  6. Bounded and Periodic Solutions of Semilinear Impulsive Periodic System on Banach Spaces

    Directory of Open Access Journals (Sweden)

    Wei W

    2008-01-01

    Full Text Available Abstract A class of semilinear impulsive periodic system on Banach spaces is considered. First, we introduce the -periodic PC-mild solution of semilinear impulsive periodic system. By virtue of Gronwall lemma with impulse, the estimate on the PC-mild solutions is derived. The continuity and compactness of the new constructed Poincaré operator determined by impulsive evolution operator corresponding to homogenous linear impulsive periodic system are shown. This allows us to apply Horn's fixed-point theorem to prove the existence of -periodic PC-mild solutions when PC-mild solutions are ultimate bounded. This extends the study on periodic solutions of periodic system without impulse to periodic system with impulse on general Banach spaces. At last, an example is given for demonstration.

  7. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  8. Mean-periodic functions

    Directory of Open Access Journals (Sweden)

    Carlos A. Berenstein

    1980-01-01

    Full Text Available We show that any mean-periodic function f can be represented in terms of exponential-polynomial solutions of the same convolution equation f satisfies, i.e., u∗f=0(μ∈E′(ℝn. This extends to n-variables the work of L. Schwartz on mean-periodicity and also extends L. Ehrenpreis' work on partial differential equations with constant coefficients to arbitrary convolutors. We also answer a number of open questions about mean-periodic functions of one variable. The basic ingredient is our work on interpolation by entire functions in one and several complex variables.

  9. Method of constructing reactor buildings

    International Nuclear Information System (INIS)

    Hyuga, Takenori; Nagai, Fumio; Akutsu, Masayoshi.

    1985-01-01

    Purpose: To shorten the construction period for LMFBR type reactors, as well as smoothly introduce high pressure steams generated in concretes upon loss of coolant accidents to the outside of the system. Method: After disposing a liner plate as a chamber lining of reactor buildings, heat insulation materials having steam discharge channels at the outer surface are attached to the outside of the liner plate and, further, an organic films are disposed to the outside of the heat insulation materials. Then, concretes are spiked to the outside of the organic films using the liner plate and the heat insulation material as the mold for concretes. In this way, the construction period can be shortened by utilizing the liner plate and the heat insulation materials as the mold for concretes, as well as steams at high temperature resulted in the concretes upon loss of coolant accidents can smoothly be discharged to the outside of the system. (Moriyama, K.)

  10. Painful periods (dysmenorrhea) (image)

    Science.gov (United States)

    Primary dysmenorrhea is a normal cramping of the lower abdomen caused by hormone-induced uterine contractions before the period. Secondary dysmenorrhea may be caused by abnormal conditions such as ...

  11. Vaginal bleeding between periods

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/article/003156.htm Vaginal bleeding between periods To use the sharing features ... this page, please enable JavaScript. This article discusses vaginal bleeding that occurs between a woman's monthly menstrual ...

  12. Super periodic potential

    Science.gov (United States)

    Hasan, Mohammd; Mandal, Bhabani Prasad

    2018-04-01

    In this paper we introduce the concept of super periodic potential (SPP) of arbitrary order n, n ∈I+, in one dimension. General theory of wave propagation through SPP of order n is presented and the reflection and transmission coefficients are derived in their closed analytical form by transfer matrix formulation. We present scattering features of super periodic rectangular potential and super periodic delta potential as special cases of SPP. It is found that the symmetric self-similarity is the special case of super periodicity. Thus by identifying a symmetric fractal potential as special cases of SPP, one can obtain the tunnelling amplitude for a particle from such fractal potential. By using the formalism of SPP we obtain the close form expression of tunnelling amplitude of a particle for general Cantor and Smith-Volterra-Cantor potentials.

  13. Establishing contract periods

    International Nuclear Information System (INIS)

    Huffman, F.C.

    1978-01-01

    The lead time for executing the Adjustable Fixed-Commitment (AFC) contract and exceptions which may be considered are discussed. The initial delivery period is also discussed. Delays, deferrals, and schedule adjustment charges are finally considered

  14. The Periodic Table CD.

    Science.gov (United States)

    Banks, Alton J.; Holmes, Jon L.

    1995-01-01

    Describes the characteristics of the digitized version of The Periodic Table Videodisc. Provides details about the organization of information and access to the data via Macintosh and Windows computers. (DDR)

  15. Setting the Periodic Table.

    Science.gov (United States)

    Saturnelli, Annette

    1985-01-01

    Examines problems resulting from different forms of the periodic table, indicating that New York State schools use a form reflecting the International Union of Pure and Applied Chemistry's 1984 recommendations. Other formats used and reasons for standardization are discussed. (DH)

  16. Quantum Hamiltonian reduction in superspace formalism

    International Nuclear Information System (INIS)

    Madsen, J.O.; Ragoucy, E.

    1994-02-01

    Recently the quantum Hamiltonian reduction was done in the case of general sl(2) embeddings into Lie algebras and superalgebras. The results are extended to the quantum Hamiltonian reduction of N=1 affine Lie superalgebras in the superspace formalism. It is shown that if we choose a gauge for the supersymmetry, and consider only certain equivalence classes of fields, then our quantum Hamiltonian reduction reduces to quantum Hamiltonian reduction of non-supersymmetric Lie superalgebras. The super energy-momentum tensor is constructed explicitly as well as all generators of spin 1 (and 1/2); thus all generators in the superconformal, quasi-superconformal and Z 2 *Z 2 superconformal algebras are constructed. (authors). 21 refs

  17. Supersymmetrically transformed periodic potentials

    OpenAIRE

    C, David J. Fernandez

    2003-01-01

    The higher order supersymmetric partners of a stationary periodic potential are studied. The transformation functions associated to the band edges do not change the spectral structure. However, when the transformation is implemented for factorization energies inside of the forbidden bands, the final potential will have again the initial band structure but it can have bound states encrusted into the gaps, giving place to localized periodicity defects.

  18. Thyrotoxic periodic paralysis

    OpenAIRE

    Rojith Karandode Balakrishnan; Suresh Rama Chandran; Geetha Thirumalnesan; Nedumaran Doraisamy

    2011-01-01

    This article aims at highlighting the importance of suspecting thyrotoxicosis in cases of recurrent periodic flaccid paralysis; especially in Asian men to facilitate early diagnosis of the former condition. A case report of a 28 year old male patient with recurrent periodic flaccid paralysis has been presented. Hypokalemia secondary to thyrotoxicosis was diagnosed as the cause of the paralysis. The patient was given oral potassium intervention over 24 hours. The patient showed complete recove...

  19. Soil retention of hexavalent chromium released from construction and demolition waste in a road-base-application scenario.

    Science.gov (United States)

    Butera, Stefania; Trapp, Stefan; Astrup, Thomas F; Christensen, Thomas H

    2015-11-15

    We investigated the retention of Cr(VI) in three subsoils with low organic matter content in laboratory experiments at concentration levels relevant to represent leachates from construction and demolition waste (C&DW) reused as unbound material in road construction. The retention mechanism appeared to be reduction and subsequent precipitation as Cr(III) on the soil. The reduction process was slow and in several experiments it was still proceeding at the end of the six-month experimental period. The overall retention reaction fit well with a second-order reaction governed by actual Cr(VI) concentration and reduction capacity of the soil. The experimentally determined reduction capacities and second-order kinetic parameters were used to model, for a 100-year period, the one-dimensional migration of Cr(VI) in the subsoil under a layer of C&DW. The resulting Cr(VI) concentration would be negligible below 7-70 cm depth. However, in rigid climates and with high water infiltration through the road pavement, the reduction reaction could be so slow that Cr(VI) might migrate as deep as 200 cm under the road. The reaction parameters and the model can form the basis for systematically assessing under which scenarios Cr(VI) from C&DW could lead to an environmental issue for ground- and receiving surface waters. Copyright © 2015 Elsevier B.V. All rights reserved.

  20. Projections of US GHG reductions from nuclear power new capacity based on historic levels of investment

    International Nuclear Information System (INIS)

    Besmann, Theodore M.

    2010-01-01

    Historical rates of capital investment in nuclear plant construction were used as a guide to estimate the potential rate of future capacity introduction. The total linear rate of capital expenditure over the entire period of historical construction from 1964 to 1990 was determined to equal $11.5 billion/yr, and that for the period of peak construction from 1973 to 1985 was computed as $17.9 billion/yr, all in 2004$. These values were used with a variety of current capital cost estimates for nuclear construction to obtain several scenarios for possible future nuclear capacity additions. These values were used to obtain the effect of projected nuclear generating capacity on GHG emissions assuming nuclear would directly replace coal-fired generation. It was concluded that actual reductions in emissions would not be experienced until 2038, yet growth in emissions from electrical production would be slowed through that period. Due to the significant time to introduce large-scale changes in the utility sector, nuclear energy cannot have a dramatic short-term effect on emissions. Nuclear power, however, can have a major positive longer term impact, particularly under more favorable cost and investment conditions.

  1. Microbial reduction of iron ore

    Science.gov (United States)

    Hoffmann, M.R.; Arnold, R.G.; Stephanopoulos, G.

    1989-11-14

    A process is provided for reducing iron ore by treatment with microorganisms which comprises forming an aqueous mixture of iron ore, microorganisms operable for reducing the ferric iron of the iron ore to ferrous iron, and a substrate operable as an energy source for the microbial reduction; and maintaining the aqueous mixture for a period of time and under conditions operable to effect the reduction of the ore. Preferably the microorganism is Pseudomonas sp. 200 and the reduction conducted anaerobically with a domestic wastewater as the substrate. An aqueous solution containing soluble ferrous iron can be separated from the reacted mixture, treated with a base to precipitate ferrous hydroxide which can then be recovered as a concentrated slurry. 11 figs.

  2. Model Reduction in Biomechanics

    Science.gov (United States)

    Feng, Yan

    mechanical parameters from experimental results. However, in real biological world, these homogeneous and isotropic assumptions are usually invalidate. Thus, instead of using hypothesized model, a specific continuum model at mesoscopic scale can be introduced based upon data reduction of the results from molecular simulations at atomistic level. Once a continuum model is established, it can provide details on the distribution of stresses and strains induced within the biomolecular system which is useful in determining the distribution and transmission of these forces to the cytoskeletal and sub-cellular components, and help us gain a better understanding in cell mechanics. A data-driven model reduction approach to the problem of microtubule mechanics as an application is present, a beam element is constructed for microtubules based upon data reduction of the results from molecular simulation of the carbon backbone chain of alphabeta-tubulin dimers. The data base of mechanical responses to various types of loads from molecular simulation is reduced to dominant modes. The dominant modes are subsequently used to construct the stiffness matrix of a beam element that captures the anisotropic behavior and deformation mode coupling that arises from a microtubule's spiral structure. In contrast to standard Euler-Bernoulli or Timoshenko beam elements, the link between forces and node displacements results not from hypothesized deformation behavior, but directly from the data obtained by molecular scale simulation. Differences between the resulting microtubule data-driven beam model (MTDDBM) and standard beam elements are presented, with a focus on coupling of bending, stretch, shear deformations. The MTDDBM is just as economical to use as a standard beam element, and allows accurate reconstruction of the mechanical behavior of structures within a cell as exemplified in a simple model of a component element of the mitotic spindle.

  3. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    International Nuclear Information System (INIS)

    Yu, Ann T.W.; Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Highlights: ► A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. ► However, the reduction cannot be sustained. ► Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006–2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  4. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk [Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong); Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara [Department of Civil and Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong)

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  5. Infinitary Combinatory Reduction Systems: Normalising Reduction Strategies

    NARCIS (Netherlands)

    Ketema, J.; Simonsen, Jakob Grue

    2010-01-01

    We study normalising reduction strategies for infinitary Combinatory Reduction Systems (iCRSs). We prove that all fair, outermost-fair, and needed-fair strategies are normalising for orthogonal, fully-extended iCRSs. These facts properly generalise a number of results on normalising strategies in

  6. PRIORITISING LEAN CONSTRUCTION BARRIERS IN UGANDA'S CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Henry Mwanaki Alinaitwe

    2009-06-01

    Full Text Available Engaging in lean construction efforts could prove to be highly rewarding for building firms in Uganda. However, lean construction is risky and can be disastrous if not properly managed. Lean production efforts in some other countries have not been successful due to the many barriers to its successful implementation. To enable sound lean construction efforts and to increase the chances of success in eliminating waste, a thorough investigation of the barriers is essential. This study presents 31 barriers and investigates their influence (strength on the success of lean construction initiatives. Structured interviews were carried out with technical managers of building firms to assess their perception of the barriers to lean production based on their experience at their firms. The strongest barrier is the provision of inputs exactly when required. Additionally, the barriers were ranked according to the ease of overcoming each. The easiest barrier to overcome is keeping the required items in the right place. Finally, a graphical aid is provided to enable decision makers to concentrate their efforts on the influential (strong, yet easy to overcome barriers. A lack of buildable designs and a participative management style for the workforce are the most important barriers to successful waste reduction in terms of strength and ease of overcoming. On the other hand, a lack of an organisational culture that supports teamwork, a lack of prefabrication and a lack of knowledgeable and skilled workers are regarded as low in strength, and at the same time difficult to overcome.

  7. Dynamical diffraction in periodic multilayers

    CERN Document Server

    Sears, V F

    1997-01-01

    Exact reflectivity curves are calculated numerically for various periodic multilayers using the optical matrix method in order to test the dynamical theory of diffraction. The theory is generally valid for values of the bilayer thickness d up to about 100 A. For somewhat larger values of d, where the theory begins to break down, the initial discrepancy is in the phase of the oscillations in the wings of the peaks. For very large values of d, where the first-order Bragg peak approaches the edge of the mirror reflection, two general types of multilayers can be distinguished. In the first (typified in the present work by Ni/Ti), there is a large (30% or more) reduction in the actual value of the critical wave vector for total reflection while, in the second (typified here by Fe/Ge), there is very little reduction (3 % or so). The origin of these two very different types of behavior is explained. It is also shown that, within the dynamical theory of diffraction, the change in the position of the center of the Dar...

  8. Application of value engineering technique in construction project

    International Nuclear Information System (INIS)

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  9. Reduction of LNG FOB cost

    International Nuclear Information System (INIS)

    Aoki, Ichizo; Kikkawa, Yoshitsugi

    1997-01-01

    To achieve a competitive LNG price for the consumers against other energy sources, reduction of LNG FOB (Free on Board) cost i.e. LNG cost at LNG ship flange, will be the key item. It is necessary to perform a many optimization studies (or value engineering) for each stage of the LNG project. These stages are: Feasibility study; Conceptual design - FEED (Front End Engineering and Design); EPC (Engineering, Procurement and Construction); Operation and maintenance. Since the LNG plant forms one part of the LNG chain, starting from gas production to LNG receiving, and requires several billion US dollar of investment, the consequences of a plant shut down on the LNG chain are clear, it is, therefore, important to get high availability which will also contribute the reduction of LNG FOB cost. (au) 25 refs

  10. Memory Reduction via Delayed Simulation

    Directory of Open Access Journals (Sweden)

    Michael Holtmann

    2011-02-01

    Full Text Available We address a central (and classical issue in the theory of infinite games: the reduction of the memory size that is needed to implement winning strategies in regular infinite games (i.e., controllers that ensure correct behavior against actions of the environment, when the specification is a regular omega-language. We propose an approach which attacks this problem before the construction of a strategy, by first reducing the game graph that is obtained from the specification. For the cases of specifications represented by "request-response"-requirements and general "fairness" conditions, we show that an exponential gain in the size of memory is possible.

  11. Periodic table of elements

    International Nuclear Information System (INIS)

    Fluck, E.; Heumann, K.G.

    1985-01-01

    Following a recommendation by the International Union for Pure and Applied Chemistry (IUPAC), the groups of the periodic table shall be numbered from 1 to 18, instead of I to VIII as before. The recommendations has been approved of by the Committee on Nomenclature of the American Chemical Society. The new system abandons the distinction between main groups (a) and auxiliary groups (b), which in the past frequently has been the reason for misunderstandings between European and American chemists, due to different handling. The publishing house VCH Verlagsgesellschaft recently produced a new periodic table that shows the old and the new numbering system together at a glance, so that chemists will have time to get familiar with the new system. In addition the new periodic table represents an extensive data compilation arranged by elements. The front page lists the chemical properties of elements, the back page their physical properties. (orig./EF) [de

  12. Thyrotoxic periodic paralysis

    Directory of Open Access Journals (Sweden)

    Rojith Karandode Balakrishnan

    2011-01-01

    Full Text Available This article aims at highlighting the importance of suspecting thyrotoxicosis in cases of recurrent periodic flaccid paralysis; especially in Asian men to facilitate early diagnosis of the former condition. A case report of a 28 year old male patient with recurrent periodic flaccid paralysis has been presented. Hypokalemia secondary to thyrotoxicosis was diagnosed as the cause of the paralysis. The patient was given oral potassium intervention over 24 hours. The patient showed complete recovery after the medical intervention and was discharged after 24 hours with no residual paralysis. Thyrotoxic periodic paralysis (TPP is a complication of thyrotoxicosis, more common amongst males in Asia. It presents as acute flaccid paralysis in a case of hyperthyroidism with associated hypokalemia. The features of thyrotoxicosis may be subtle or absent. Thus, in cases of recurrent or acute flaccid muscle paralysis, it is important to consider thyrotoxicosis as one of the possible causes, and take measures accordingly.

  13. Sustainable construction: Composite use of tyres and ash in concrete

    Energy Technology Data Exchange (ETDEWEB)

    Snelson, D.G.; Kinuthia, J.M.; Davies, P.A.; Chang, S.R. [University of Glamorgan, Pontypridd (United Kingdom). Faculty of Advanced Technology

    2009-01-15

    An investigation was carried out to establish the physical, mechanical and chemical characteristics of a non-standard (unprocessed) pulverised fuel ash (PFA) and waste tyres from a former landfill site at the Power Station Hill near Church Village, South Wales, United Kingdom. Investigations are on-going to establish the suitability of the fly ash and/or tyres in road construction (embankment and pavement) and also in concrete to be used in the construction of the proposed highway. This paper reports on concrete-based construction where concrete blends (using various levels of PFA as partial replacement for Portland cement (PC), and shredded waste tyres (chips 15-20 mm) as aggregate replacement) were subjected to unconfined compressive strength tests to establish performance, hence, optimising mix designs. Strength development up to 180 days for the concrete made with PC-PFA blends as binders (PC-PFA concrete), with and without aggregate replacement with tyre chips, is reported. The binary PC-PFA concrete does not have good early strength but tends to improve at longer curing periods. The low early strength observed means that PC-PFA concrete cannot be used for structures, hence, only as low to medium strength applications such as blinding, low-strength foundations, crash barriers, noise reduction barriers, cycle paths, footpaths and material for pipe bedding.

  14. Effect of construction of Dukovany nuclear power plant on development of organizational structure of Prumyslove Stavby Brno

    International Nuclear Information System (INIS)

    Miks, L.

    1985-01-01

    Prumyslove stavby was set up in 1969 and its structure has undergone considerable changes. No major changes were made during the pre-production stage and in the construction preparation period (1969-77). With increased building work volume the organizational structure expanded: new units, such as building site plants, etc., were opened. The current period is characterized by gradual reduction in production capacity, mainly in units providing special jobs. All production units will be closed down with the termination of the nuclear power plant in 1987. (Pu)

  15. Reduction in language testing

    DEFF Research Database (Denmark)

    Dimova, Slobodanka; Jensen, Christian

    2013-01-01

    /video recorded speech samples and written reports produced by two experienced raters after testing. Our findings suggest that reduction or reduction-like pronunciation features are found in tested L2 speech, but whenever raters identify and comment on such reductions, they tend to assess reductions negatively......This study represents an initial exploration of raters' comments and actual realisations of form reductions in L2 test speech performances. Performances of three L2 speakers were selected as case studies and illustrations of how reductions are evaluated by the raters. The analysis is based on audio...

  16. Periodically poled silicon

    Science.gov (United States)

    Hon, Nick K.; Tsia, Kevin K.; Solli, Daniel R.; Khurgin, Jacob B.; Jalali, Bahram

    2010-02-01

    Bulk centrosymmetric silicon lacks second-order optical nonlinearity χ(2) - a foundational component of nonlinear optics. Here, we propose a new class of photonic device which enables χ(2) as well as quasi-phase matching based on periodic stress fields in silicon - periodically-poled silicon (PePSi). This concept adds the periodic poling capability to silicon photonics, and allows the excellent crystal quality and advanced manufacturing capabilities of silicon to be harnessed for devices based on χ(2)) effects. The concept can also be simply achieved by having periodic arrangement of stressed thin films along a silicon waveguide. As an example of the utility, we present simulations showing that mid-wave infrared radiation can be efficiently generated through difference frequency generation from near-infrared with a conversion efficiency of 50% based on χ(2) values measurements for strained silicon reported in the literature [Jacobson et al. Nature 441, 199 (2006)]. The use of PePSi for frequency conversion can also be extended to terahertz generation. With integrated piezoelectric material, dynamically control of χ(2)nonlinearity in PePSi waveguide may also be achieved. The successful realization of PePSi based devices depends on the strength of the stress induced χ(2) in silicon. Presently, there exists a significant discrepancy in the literature between the theoretical and experimentally measured values. We present a simple theoretical model that produces result consistent with prior theoretical works and use this model to identify possible reasons for this discrepancy.

  17. Hereditary periodic fever syndromes

    NARCIS (Netherlands)

    McDermott, MF; Frenkel, J

    Hereditary periodic fever syndromes are defined by recurrent attacks of generalised inflammation for which no infectious or auto-immune cause can be identified. For most of these disorders, the molecular basis has recently been elucidated. This has opened the prospect of novel therapeutic

  18. Almost periodic Schroedinger operators

    International Nuclear Information System (INIS)

    Bellissard, J.; Lima, R.

    1984-01-01

    These lectures are devoted to recent developments in the theory of almost-periodic Schroedinger Operators. We specially describe the algebraic point of view, with applications to gap-labelling theorems. Particular models are also presented which exhibit various spectral properties. (orig.)

  19. Astrophysical implications of periodicity

    International Nuclear Information System (INIS)

    Muller, R.A.

    1988-01-01

    Two remarkable discoveries of the last decade have profound implications for astrophysics and for geophysics. These are the discovery by Alvarez et al., that certain mass extinctions are caused by the impact on the earth of a large asteroid or comet, and the discovery by Raup and Sepkoski that such extinctions are periodic, with a cycle time of 26 to 30 million years. The validity of both of these discoveries is assumed and the implications are examined. Most of the phenomena described depend not on periodicity, but just on the weaker assumption that the impacts on the earth take place primarily in showers. Proposed explanations for the periodicity include galactic oscillations, the Planet X model, and the possibility of Nemesis, a solar companion star. These hypotheses are critically examined. Results of the search for the solar companion are reported. The Deccan flood basalts of India have been proposed as the impact site for the Cretaceous impact, but this hypotheisis is in contradiction with the conclusion of Courtillot et al., that the magma flow began during a period of normal magnetic field. A possible resolution of this contradiction is proposed

  20. Periodic Table of Students.

    Science.gov (United States)

    Johnson, Mike

    1998-01-01

    Presents an exercise in which an eighth-grade science teacher decorated the classroom with a periodic table of students. Student photographs were arranged according to similarities into vertical columns. Students were each assigned an atomic number according to their placement in the table. The table is then used to teach students about…

  1. A Modern Periodic Table.

    Science.gov (United States)

    Herrenden-Harker, B. D.

    1997-01-01

    Presents a modern Periodic Table based on the electron distribution in the outermost shell and the order of filling of the sublevels within the shells. Enables a student to read off directly the electronic configuration of the element and the order in which filling occurs. (JRH)

  2. Elemental analysis: Reduction to SI units; Rueckfuehrung in der Elementanalytik

    Energy Technology Data Exchange (ETDEWEB)

    Rienitz, O.; Jaehrling, R.; Schiel, D. [PTB-Arbeitsgruppe ' ' Anorganische Analytik' ' , Braunschweig (Germany); Matschat, R.; Kipphardt, H. [Bundesanstalt fuer Materialforschung und -pruefung, Berlin (Germany); Gernand, W.; Oeter, D. [MercK KGaA (Germany)

    2005-12-15

    In a joint project, PTB, BAM and Merck KGaA worked on a metrological reduction system for all elements relevant to analysis. The BAM certified primary pure substances with a relative error of U{sub rel} {<=} 0.01% for the mass of the main element. This was achieved by measuring the mass components of all potential impurities, i.e. practically all elements of the periodic system except the main element. These pure substances are the national reference standards of elemental analysis. From them, PTB produces primary elementa solutions and transfer solutions which are passed on as reference standards. The industrial partner constructed the DKD calibration laboratory, which certifies commercial secondary calibration solutions on the basis of the reference standard solutions produced by PTB. With this final product, measurements in elemental analysis can be reduced to the SI units system as a routine procedure. (orig.)

  3. Cost reduction and safety design features of new nuclear power plants in India. Annex 13

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    Indian Nuclear Power Programme is designed to exploit limited reserves of uranium and extensive resource of thorium. Pressurised heavy water reactors are found most suitable and form the main stay of the first stage of the programme. Thorium utilisation is achieved in the second and third stages. Today India has total installed capacity of 2720 MWe of PHWRs which are operating with high plant load factors of over 80%. Rich experience of construction and operation of over 150 reactor years is being utilised in effecting cost reduction and safety improvements. Standardisation and reduction in gestation period by preproject activities, advance procurement and work packages of engineer, procure, construct and commission are some of the techniques being adopted for cost reduction in the new projects. But the cost of safety is rising. Design basis event of double ended guillotine rupture of primary pressure boundary needs a relook based on current knowledge of material behaviour. This event appears improbable. Similarly some of the safety related systems like closed loop cooling water operating at low temperature and pressure, and low usage factors may be designed as per standard codes without invoking special nuclear requirements. The paper will address these issues and highlight the possible areas for cost reduction both in operating and safety systems. Modern construction and project management techniques are being employed. Gestation period of 5 years and cost of less than US $1400 per KWe are the present targets. In Indian environment nuclear power is found to be competitive with thermal power plants at distances of about 800 Kms from the coal mines. (author)

  4. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies

  5. Air Force construction automation/robotics

    Science.gov (United States)

    Nease, AL; Dusseault, Christopher

    1994-01-01

    The Air Force has several unique requirements that are being met through the development of construction robotic technology. The missions associated with these requirements place construction/repair equipment operators in potentially harmful situations. Additionally, force reductions require that human resources be leveraged to the maximum extent possible and that more stringent construction repair requirements push for increased automation. To solve these problems, the U.S. Air Force is undertaking a research and development effort at Tyndall AFB, FL to develop robotic teleoperation, telerobotics, robotic vehicle communications, automated damage assessment, vehicle navigation, mission/vehicle task control architecture, and associated computing environment. The ultimate goal is the fielding of robotic repair capability operating at the level of supervised autonomy. The authors of this paper will discuss current and planned efforts in construction/repair, explosive ordnance disposal, hazardous waste cleanup, fire fighting, and space construction.

  6. Integrated Constructed Wetlands (ICW) for livestock wastewater management.

    Science.gov (United States)

    Harrington, Rory; McInnes, Robert

    2009-11-01

    Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.

  7. Construction dust amelioration techniques.

    Science.gov (United States)

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  8. Improving concrete overlay construction.

    Science.gov (United States)

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  9. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  10. Construction Sector (NAICS 23)

    Science.gov (United States)

    Find environmental regulatory information for the construction sector, including the construction of buildings or engineering projects. This includes RCRA information for hazardous waste, refrigeration compliance, asbestos, effluent guidelines & lead laws

  11. Organizational Behaviour in Construction

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    2013-01-01

    Review of: Organizational Behaviour in Construction / Anthony Walker (Wiley-Blackwell,2011 336 pp)......Review of: Organizational Behaviour in Construction / Anthony Walker (Wiley-Blackwell,2011 336 pp)...

  12. Validating MEDIQUAL Constructs

    Science.gov (United States)

    Lee, Sang-Gun; Min, Jae H.

    In this paper, we validate MEDIQUAL constructs through the different media users in help desk service. In previous research, only two end-users' constructs were used: assurance and responsiveness. In this paper, we extend MEDIQUAL constructs to include reliability, empathy, assurance, tangibles, and responsiveness, which are based on the SERVQUAL theory. The results suggest that: 1) five MEDIQUAL constructs are validated through the factor analysis. That is, importance of the constructs have relatively high correlations between measures of the same construct using different methods and low correlations between measures of the constructs that are expected to differ; and 2) five MEDIQUAL constructs are statistically significant on media users' satisfaction in help desk service by regression analysis.

  13. Rogue periodic waves of the modified KdV equation

    Science.gov (United States)

    Chen, Jinbing; Pelinovsky, Dmitry E.

    2018-05-01

    Rogue periodic waves stand for rogue waves on a periodic background. Two families of travelling periodic waves of the modified Korteweg–de Vries (mKdV) equation in the focusing case are expressed by the Jacobian elliptic functions dn and cn. By using one-fold and two-fold Darboux transformations of the travelling periodic waves, we construct new explicit solutions for the mKdV equation. Since the dn-periodic wave is modulationally stable with respect to long-wave perturbations, the new solution constructed from the dn-periodic wave is a nonlinear superposition of an algebraically decaying soliton and the dn-periodic wave. On the other hand, since the cn-periodic wave is modulationally unstable with respect to long-wave perturbations, the new solution constructed from the cn-periodic wave is a rogue wave on the cn-periodic background, which generalizes the classical rogue wave (the so-called Peregrine’s breather) of the nonlinear Schrödinger equation. We compute the magnification factor for the rogue cn-periodic wave of the mKdV equation and show that it remains constant for all amplitudes. As a by-product of our work, we find explicit expressions for the periodic eigenfunctions of the spectral problem associated with the dn and cn periodic waves of the mKdV equation.

  14. Heterotic string construction

    International Nuclear Information System (INIS)

    Schellekens, A.N.

    1989-01-01

    In this paper an elementary introduction to the principles of four-dimensional string construction will be given. Although the emphasis is on lattice constructions, almost all results have further, and often quite straightforward generalizations to other constructions. Since heterotic strings look phenomenologically more promising than type-II theories the authors only consider the former, although everything can easily be generalized to type-II theories. Some additional aspects of lattice constructions are discussed, and an extensive review can be found

  15. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  16. Pole masses of quarks in dimensional reduction

    International Nuclear Information System (INIS)

    Avdeev, L.V.; Kalmykov, M.Yu.

    1997-01-01

    Pole masses of quarks in quantum chromodynamics are calculated to the two-loop order in the framework of the regularization by dimensional reduction. For the diagram with a light quark loop, the non-Euclidean asymptotic expansion is constructed with the external momentum on the mass shell of a heavy quark

  17. MCNP variance reduction overview

    International Nuclear Information System (INIS)

    Hendricks, J.S.; Booth, T.E.

    1985-01-01

    The MCNP code is rich in variance reduction features. Standard variance reduction methods found in most Monte Carlo codes are available as well as a number of methods unique to MCNP. We discuss the variance reduction features presently in MCNP as well as new ones under study for possible inclusion in future versions of the code

  18. Modern Reduction Methods

    CERN Document Server

    Andersson, Pher G

    2008-01-01

    With its comprehensive overview of modern reduction methods, this book features high quality contributions allowing readers to find reliable solutions quickly and easily. The monograph treats the reduction of carbonyles, alkenes, imines and alkynes, as well as reductive aminations and cross and heck couplings, before finishing off with sections on kinetic resolutions and hydrogenolysis. An indispensable lab companion for every chemist.

  19. Thyrotoxic periodic paralysis

    International Nuclear Information System (INIS)

    Ferreiro, J.E.; Arguelles, D.J.; Rams, H. Jr.

    1986-01-01

    A case of thyrotoxic periodic paralysis is reported in a Hispanic man with an unusual recurrence six weeks after radioactive iodine treatment. Thyrotoxic periodic paralysis has now been well characterized in the literature: it occurs primarily in Orientals with an overwhelming male preponderance and a higher association of specific HLA antigens. Clinical manifestations include onset after high carbohydrate ingestion or heavy exertion, with progressive symmetric weakness leading to flaccid paralysis of the extremities and other muscle groups, lasting several hours. If hypokalemia is present, potassium administration may help abort the attack. Although propranolol can be efficacious in preventing further episodes, the only definitive treatment is establishing a euthyroid state. The pathophysiology is still controversial, but reflects altered potassium and calcium dynamics as well as certain morphologic characteristics within the muscle unit itself

  20. Chemical model reduction under uncertainty

    KAUST Repository

    Malpica Galassi, Riccardo

    2017-03-06

    A general strategy for analysis and reduction of uncertain chemical kinetic models is presented, and its utility is illustrated in the context of ignition of hydrocarbon fuel–air mixtures. The strategy is based on a deterministic analysis and reduction method which employs computational singular perturbation analysis to generate simplified kinetic mechanisms, starting from a detailed reference mechanism. We model uncertain quantities in the reference mechanism, namely the Arrhenius rate parameters, as random variables with prescribed uncertainty factors. We propagate this uncertainty to obtain the probability of inclusion of each reaction in the simplified mechanism. We propose probabilistic error measures to compare predictions from the uncertain reference and simplified models, based on the comparison of the uncertain dynamics of the state variables, where the mixture entropy is chosen as progress variable. We employ the construction for the simplification of an uncertain mechanism in an n-butane–air mixture homogeneous ignition case, where a 176-species, 1111-reactions detailed kinetic model for the oxidation of n-butane is used with uncertainty factors assigned to each Arrhenius rate pre-exponential coefficient. This illustration is employed to highlight the utility of the construction, and the performance of a family of simplified models produced depending on chosen thresholds on importance and marginal probabilities of the reactions.

  1. Time-Varying Periodicity in Intraday Volatility

    DEFF Research Database (Denmark)

    Andersen, Torben Gustav; Thyrsgaard, Martin; Todorov, Viktor

    We develop a nonparametric test for deciding whether return volatility exhibits time-varying intraday periodicity using a long time-series of high-frequency data. Our null hypothesis, commonly adopted in work on volatility modeling, is that volatility follows a stationary process combined...... with a constant time-of-day periodic component. We first construct time-of-day volatility estimates and studentize the high-frequency returns with these periodic components. If the intraday volatility periodicity is invariant over time, then the distribution of the studentized returns should be identical across...... with estimating volatility moments through their sample counterparts. Critical values are computed via easy-to-implement simulation. In an empirical application to S&P 500 index returns, we find strong evidence for variation in the intraday volatility pattern driven in part by the current level of volatility...

  2. A generalized, periodic nonlinearity-reduced interferometer for straightness measurements

    International Nuclear Information System (INIS)

    Wu Chienming

    2008-01-01

    Periodic nonlinearity is a systematic error limiting the accuracy of displacement measurements at the nanometer level. However, an interferometer with a displacement measurement accuracy of less than 1 nm is required in nanometrology and in fundamental scientific research. To meet this requirement, a generalized, periodic nonlinearity-reduced interferometer, based on three construction principles has been developed for straightness measurements. These three construction principles have resulted in an interferometer with a highly stable design with reduced periodic nonlinearity. Verifications by a straightness interferometer have demonstrated that the periodic nonlinearity was less than 40 pm. The results also demonstrate that the interferometer design is capable of subnanometer accuracy and is useful in nanometrology

  3. Schedule and cost reduction of nuclear generating facilities in Ontario study overview

    International Nuclear Information System (INIS)

    Huterer, J.

    1991-01-01

    During the five year period 1985 to 1990, Ontario Hydro conducted a major study with the objective to reduce the cost and construction duration for future nuclear generating facilities in Ontario. This paper reports on the study called Major Projects: Schedule and Cost Reduction Study (SCRS). Ontario Hydro is a public utility with the responsibility for meeting electricity need for the province of Ontario with a population of 9.6 million. In order to adequately address future electricity needs, Ontario Hydro has developed and submitted a demand/supply plan which covers the next 25 years. The SCRS for major projects contributed to this demand/supply plan

  4. Cost reduction of LWRs - The main features

    International Nuclear Information System (INIS)

    Board, J.A.; Norman, D.

    1991-01-01

    For effective generation cost reductions to be achieved while maintaining safety levels, the impact of each of the above element and their interactions must be fully assessed, together with the effects of uncertainty on commercial risk. the amount of interest during construction which must be paid can be minimised by adopting designs, output ratings (unit size), and construction methods which minimise construction time. However this must be done without unduly increasing specific capital cost. Total capital costs can be reduced by sharing design and project launching costs and front-end design and licensing costs, across a series of identical plants. The paper is reviewing costs and performance factors such as those above with the aim of identifying the strategies which might be necessary within and between countries in order to create an environment which would enable cost reductions on LWRs to be made. (author)

  5. Sustainable construction: construction and demolition waste reconsidered.

    Science.gov (United States)

    del Río Merino, Mercedes; Izquierdo Gracia, Pilar; Weis Azevedo, Isabel Salto

    2010-02-01

    Construction activity in Europe has increased substantially in the past decade. Likewise, there has also been a commensurate rise in the generation of construction and demolition waste (C&DW). This, together with the fact that in many European countries the rate of recycling and reuse of C&DW is still quite low has engendered a serious environmental problem and a motivation to develop strategies and management plans to solve it. Due to its composition, there is a significant potential to reuse and/or recycle C&DW, and thereby, contribute to improving the sustainability of construction and development, but practical procedures are not yet widely known or practiced in the construction industry. This article (a) summarizes the different applications that are presently practiced to optimize the recovery and/or application of C&DW for reuse, and (b) proposes various measures and strategies to improve the processing of this waste. The authors suggest that to enhance environmental effectiveness, a conscious and comprehensive C&DW management plan should be implemented in each jurisdiction. More precisely, this study presents a holistic approach towards C&DW management, through which environmental benefits can be achieved through the application of new construction methods that can contribute to sustainable growth.

  6. Ultrasound guided reduction of childhood intussusception

    International Nuclear Information System (INIS)

    Yoon, Chong Hyun; Kim, Han Suk

    1986-01-01

    Following on from diagnosis using ultrasound, hydrostatic reduction using saline enema under ultrasound guidance was tried in 20 cases of childhood intussusception. The conclusions were as follows: 1. Success rates of saline enema under ultrasound guidance during a first-8 month period (P1) and a second-10 month period (P2) were 55.6% (5/9) and 54.5% (6/11) respectively. Average success rate was 55% (11/20). 2. During the periods of P1 and P2, no case was reduced by barium enema in 6 cases of failed reduction with saline enema. 3. During the period of P2, 5 cases of successful reduction with saline enema were confirmed by clinical follow-up without barium enema. 4. During the periods of P1 and P2, 9 cases of failed reduction with saline enema were operated, resulting in 6 cases of segmental resection and 3 cases of manual reduction. 5. The obvious advantages of this method are: 1. No radiation hazard. 2. No fear of barium peritonitis. 3. Detection of leading point. 6. With above results, this method could completely replace barium enema. And ultrasonography should be the initial study in the evaluation of intussusception in children and then if necessary, saline enema under ultrasound guidance should be done.

  7. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  8. Towards green construction

    International Nuclear Information System (INIS)

    Bajracharya, Bijaya B.; Shrestha, Prasanna M.

    2000-01-01

    Sustainability is the key to any development works. In the operation phase, hydro power is the most sustainable form of energy. However construction activities for the same power station are usually far from being green. The popular myth is that construction activity converts green into grey. Despite this popular myth, construction of a hydro power project in Nepal has made the project area greener than earlier during the construction phase itself. Choice of construction technology, appropriate level of environmental impact assessment, monitoring of environmental parameters along side the construction progress followed by mitigation at the right time; launching community development programmes side by side, having environmental specification in contractual documents and self-reliance to fulfill environmental obligations by contractors itself are the key factors in the environmental management within the construction activities. The main conclusions in the paper is the need to change the way to think about the project constraints

  9. How engineering facilitates construction

    International Nuclear Information System (INIS)

    Bailey, D.T.

    1976-01-01

    During a recent survey, construction personnel at jobsites were asked, ''what are the ten most unwanted construction problems.'' One reoccurring answer was design/construction incompatibility. In fact, many designs were impractical from a construction point of view. The reasons for this problem can be identified: Once construction begins, engineering is under intense pressure to issue new drawings to allow work to progress according to schedule. Other reasons may be the relative inexperience of the design personnel in construction, changes in design criteria and delays in receipt of supplier or client information. A description is presented of ways to solve this problem by obtaining construction expertise and input into the various phases and products of the engineering work

  10. On Helmholtz Problem for Plane Periodical Structures

    International Nuclear Information System (INIS)

    Akishin, P.G.; Vinitskij, S.I.

    1994-01-01

    The plane Helmholtz problem of the periodical disc structures with the phase shifts conditions of the solutions along the basis lattice vectors and the Dirichlet conditions on the basic boundaries is considered. The Green function satisfying the quasi periodical conditions on the lattice is constructed. The Helmholtz problem is reduced to the boundary integral equations for the simple layer potentials of this Green function. The methods of the discretization of the arising integral equations are proposed. The procedures of calculation of the matrix elements are discussed. The reality of the spectral parameter of the nonlinear continuous and discretized problems is shown. 8 refs., 2 figs

  11. Construction industry accidents in Spain.

    Science.gov (United States)

    Camino López, Miguel A; Ritzel, Dale O; Fontaneda, Ignacio; González Alcantara, Oscar J

    2008-01-01

    This paper analyzed industrial accidents that take place on construction sites and their severity. Eighteen variables were studied. We analyzed the influence of each of these with respect to the severity and fatality of the accident. This descriptive analysis was grounded in 1,630,452 accidents, representing the total number of accidents suffered by workers in the construction sector in Spain over the period 1990-2000. It was shown that age, type of contract, time of accident, length of service in the company, company size, day of the week, and the remainder of the variables under analysis influenced the seriousness of the accident. IMPACT ON INJURY PREVENTION: The results obtained show that different training was needed, depending on the severity of accidents, for different age, length of service in the company, organization of work, and time when workers work. The research provides an insight to the likely causes of construction injuries in Spain. As a result of the analysis, industries and governmental agencies in Spain can start to provide appropriate strategies and training to the construction workers.

  12. Construction safety program for the National Ignition Facility

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF

  13. Construction safety program for the National Ignition Facility

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF's management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES ampersand H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES ampersand H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES ampersand H support organizations and administrative groups, and describes their interactions with the NIF Program

  14. Construction safety program for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-06-26

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF.

  15. Construction safety program for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF`s management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES&H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES&H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES&H support organizations and administrative groups, and describes their interactions with the NIF Program.

  16. Using periodicity to mitigate ground vibration

    DEFF Research Database (Denmark)

    Andersen, Lars Vabbersgaard

    2015-01-01

    Introduction of trenches, barriers and wave impeding blocks on the transmission path between a source and receiver can be used for mitigation of ground vibration. However, to be effective a barrier must have a depth of about one wavelength of the waves to be mitigated. Hence, while great reductions......: A soil with periodic stiffening (ground improvement) and a ground with periodic changes in the surface elevation obtained by artificial landscaping. By means of a two-dimensional finite-element model, the stiffness and mass matrices are determined for a single cell of the ground with horizonal...

  17. Polysheroidal periodic functions

    International Nuclear Information System (INIS)

    Truskova, N.F.

    1985-01-01

    Separation of variables in the Helmholtz N-dimensional (N≥4) equation in polyspheroidal coordinate systems leads to the necessity of solving equations going over into equations for polyspheroidal periodic functions used for solving the two-centre problem in quantum mechanics, the three-body problem with Coulomb interaction, etc. For these functions the expansions are derived in terms of the Jacobi polynomials and Bessel functions. Their basic properties, asymptotics are considered. The algorithm of their computer calculations is developed. The results of numerical calculations are given

  18. Deciphering Periodic Methanol Masers

    Science.gov (United States)

    Stecklum, Bringfried; Caratti o Garatti, Alessio; Henning, Thomas; Hodapp, Klaus; Hopp, Ulrich; Kraus, Alex; Linz, Hendrik; Sanna, Alberto; Sobolev, Andrej; Wolf, Verena

    2018-05-01

    Impressive progress has been made in recent years on massive star formation, yet the involved high optical depths even at submm/mm wavelengths make it difficult to reveal its details. Recently, accretion bursts of massive YSOs have been identified to cause flares of Class II methanol masers (methanol masers for short) due to enhanced mid-IR pumping. This opens a new window to protostellar accretion variability, and implies that periodic methanol masers hint at cyclic accretion. Pinning down the cause of the periodicity requires joint IR and radio monitoring. We derived the first IR light curve of a periodic maser host from NEOWISE data. The source, G107.298+5.639, is an intermediate-mass YSO hosting methanol and water masers which flare every 34.5 days. Our recent joint K-band and radio observations yielded first but marginal evidence for a phase lag between the rise of IR and maser emission, respectively, and revealed that both NEOWISE and K-band light curves are strongly affected by the light echo from the ambient dust. Both the superior resolution of IRAC over NEOWISE and the longer wavelengths compared to our ground-based imaging are required to inhibit the distractive contamination by the light echo. Thus, we ask for IRAC monitoring of G107 to cover one flare cycle, in tandem with 100-m Effelsberg and 2-m Wendelstein radio and NIR observations to obtain the first high-quality synoptic measurements of this kind of sources. The IR-maser phase lag, the intrinsic shape of the IR light curves and their possible color variation during the cycle allow us to constrain models for the periodic maser excitation. Since methanol masers are signposts of intermediate-mass and massive YSOs, deciphering their variability offers a clue to the dynamics of the accretion-mediated growth of massive stars and their feedback onto the immediate natal environment. The Spitzer light curve of such a maser-hosting YSO would be a legacy science product of the mission.

  19. Development of Innovative Construction Technologies for ABWRs

    International Nuclear Information System (INIS)

    Yamashita, T.; Fukuda, T.; Masuda, N.

    2002-01-01

    This paper describes an effort by Tokyo Electric Power Company (TEPCO) to shorten the construction time in a drastic manner for the Advanced Boiling Water Reactors (ABWR), thereby aiming at reducing construction costs. First an outline of the actual construction records for the five BWR Units and the two ABWR Units at the Kashiwazaki-Kariwa site is introduced along with the construction methods employed for these units. There is a continued trend in the reduction of construction time from Unit 1 to 7 owing to a number of improvements made to these units, and in particular it is noteworthy that the drastic reduction was accomplished due to the change in reactor type from BWR to ABWR. Explained next is an on-going effort for the next ABWR and the following next generation of ABWRs to further shorten construction time. In this effort an emphasis is laid on the development of innovative construction methods by the adoption of steel plate/concrete composite structures (SC Structure), and the application of those structures even to containment vessel (so-called SCCV). This work is being conducted as part of TEPCO's research and development for the next generation ABWRs (ABWR II). Presently it is expected that the construction time from bedrock inspection to fuel loading could be shortened in a stepwise fashion to 38 and 31.5 months for the next ABWR and finally to 23 months for the next generation ABWR II, thus enabling a greatly reduced power generating cost and enhanced safety during construction. In addition to the above effort, a preliminary study has been performed concerning the application of base isolation systems to ABWR plants. From this study which is aimed at standardization, lowered cost and mitigation of engineering work, it was found that base isolation system effectively reduces seismic response and is instrumental in achieving the above-mentioned objectives. Therefore it can be said that the use of this system gives more freedom in selecting sites

  20. Electrochemical reduction of NiO in a composite electrode

    DEFF Research Database (Denmark)

    Hu, Qiang; Jacobsen, Torben; Hansen, Karin Vels

    2013-01-01

    a lower overpotential. Microstructures of NiO with different reduction degrees are shown. Electrochemical impedance spectroscopy is carried out during the reduction process. Electrochemical reduction of NiO may need an induction period. When NiO is reduced at a constant voltage the current initially...

  1. 5 CFR 359.405 - Removal: Reduction in force.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Removal: Reduction in force. 359.405... Appointees During Probation § 359.405 Removal: Reduction in force. (a) Coverage. This section covers the removal of a career appointee from the SES during the probationary period under a reduction in force. (b...

  2. Constructing Student Problems in Phylogenetic Tree Construction.

    Science.gov (United States)

    Brewer, Steven D.

    Evolution is often equated with natural selection and is taught from a primarily functional perspective while comparative and historical approaches, which are critical for developing an appreciation of the power of evolutionary theory, are often neglected. This report describes a study of expert problem-solving in phylogenetic tree construction.…

  3. Standartization and Terminography of New Construction Terms

    Directory of Open Access Journals (Sweden)

    Zofija Babickienė

    2011-06-01

    Full Text Available The past ten year period showed the occurance of a great number of new construction terms in the Lithua- nian language. Thus it is necessary to collect and systematize construction terms, terminoids, quasi-terms and standardize them from the point of view of the Standard Lithuanian Language taking into account both logic and terminology requirements. This article deals with modern construction terms from the point of view of the Standard Lithuanian Language including newest data bases saving all actual information on them. The reseach showed that The Dictionary of Construction Terms (2003 ought to be included into The Lithuanian language Term Bank (http://terminai.vlkk.lt. It is necessary to be done for the following reasons. Firstly, because of the creation and standartization as well as sistematization process of new construction terms. Secondly, for the development of continuous scientific discusion and successful professional education. It was established that a certain number of construction terms from the point of view of the Standard Lithuanian Language should be included into new Dictionary of Construction Terms as well as into Term Bank of the Lithuanian Republic. The terms analysed in the article are concerning basement types, pile types, construction joints, also details of walls, roofs, chimneys, construction materials and etc. The analysis showed how different morphological variants and undesirable synonymous terms occur. Finally, the analysis helped to identify that the informal terms mix with formal, standard terms and conclude in incorrect term usage.

  4. Professional entrepreneurial identity construction

    DEFF Research Database (Denmark)

    Ramsgaard, Michael Breum

    The present study investigates the construction of a professional identity as an entrepreneur in a sample of people with educational background in nutrition and health. The study examines the connection between professional identity construction and entrepreneurial business emergence using...... ‘entrepreneurial preparedness’ as parameter. This research seeks to address the following questions: What significant components or characteristics do entrepreneurs rely on in the early processes of constructing an entrepreneurial identity....

  5. Imperfect construction of microclusters

    Science.gov (United States)

    Schneider, E.; Zhou, K.; Gilbert, G.; Weinstein, Y. S.

    2014-01-01

    Microclusters are the basic building blocks used to construct cluster states capable of supporting fault-tolerant quantum computation. In this paper, we explore the consequences of errors on microcluster construction using two error models. To quantify the effect of the errors we calculate the fidelity of the constructed microclusters and the fidelity with which two such microclusters can be fused together. Such simulations are vital for gauging the capability of an experimental system to achieve fault tolerance.

  6. Periodically modulated dark states

    Science.gov (United States)

    Han, Yingying; Zhang, Jun; Zhang, Wenxian

    2018-04-01

    Phenomena of electromagnetically induced transparency (PEIT) may be interpreted by the Autler-Townes Splitting (ATS), where the coupled states are split by the coupling laser field, or by the quantum destructive interference (QDI), where the atomic phases caused by the coupling laser and the probe laser field cancel. We propose modulated experiments to explore the PEIT in an alternative way by periodically modulating the coupling and the probe fields in a Λ-type three-level system initially in a dark state. Our analytical and numerical results rule out the ATS interpretation and show that the QDI interpretation is more appropriate for the modulated experiments. Interestingly, dark state persists in the double-modulation situation where control and probe fields never occur simultaneously, which is significant difference from the traditional dark state condition. The proposed experiments are readily implemented in atomic gases, artificial atoms in superconducting quantum devices, or three-level meta-atoms in meta-materials.

  7. Reduction - competitive tomorrow

    International Nuclear Information System (INIS)

    Worley, L.; Bargerstock, S.

    1995-01-01

    Inventory reduction is one of the few initiatives that represent significant cost-reduction potential that does not result in personnel reduction. Centerior Energy's Perry nuclear power plant has embarked on an aggressive program to reduce inventory while maintaining plant material availability. Material availability to the plant was above 98%, but at an unacceptable 1994 inventory book value of $47 million with inventory carrying costs calculated at 30% annually

  8. Toshiba's developments on construction techniques of nuclear power plants

    International Nuclear Information System (INIS)

    Hayashi, Y.; Itoh, N.

    1987-01-01

    Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation

  9. Process energy reduction

    International Nuclear Information System (INIS)

    Lowthian, W.E.

    1993-01-01

    Process Energy Reduction (PER) is a demand-side energy reduction approach which complements and often supplants other traditional energy reduction methods such as conservation and heat recovery. Because the application of PER is less obvious than the traditional methods, it takes some time to learn the steps as well as practice to become proficient in its use. However, the benefit is significant, often far outweighing the traditional energy reduction approaches. Furthermore, the method usually results in a better process having less waste and pollution along with improved yields, increased capacity, and lower operating costs

  10. Metallothermic reduction of molybdate

    International Nuclear Information System (INIS)

    Mukherjee, T.K.; Bose, D.K.

    1987-01-01

    This paper gives a brief account of the investigations conducted so far on metallothermic reduction of high grade molybdenite with particular emphasis on the work carried out in Bhabha Atomic Research Centre. Based on thermochemical considerations, the paper first introduces a number of metallic reductants suitable for use in metallothermic reduction of molybdenite. Aluminium, sodium and tin are found to be suitable reducing agents and very rightly they have found most applications in the research and development efforts on metallothermic reduction of molybdenite. The reduction with tin was conducted on fairly large scale both in vacuum and hydrogen atmosphere. The reaction was reported to be invariant depending mainly on the reduction temperature and a temperature of the order of 1250deg to 1300degC was required for good metal recovery. In comparison to tin, aluminothermic reduction of molybdenite was studied more extensively and it was conducted in closed bomb, vacuum and also in open atmosphere. In aluminothermic reduction, the influence of amount of reducing agent, amount of heat booster, preheating temperature and charging procedure on these metal yield was studied in detail. The reduction generally yielded massive molybdenum metal contaminated with aluminium as the major impurity element. Efforts were made to purify the reduced metal by arc melting, electron beam melting and molten salt electrorefining. 9 refs. (author)

  11. Construction Worker Fatigue Prediction Model Based on System Dynamic

    OpenAIRE

    Wahyu Adi Tri Joko; Ayu Ratnawinanda Lila

    2017-01-01

    Construction accident can be caused by internal and external factors such as worker fatigue and unsafe project environment. Tight schedule of construction project forcing construction worker to work overtime in long period. This situation leads to worker fatigue. This paper proposes a model to predict construction worker fatigue based on system dynamic (SD). System dynamic is used to represent correlation among internal and external factors and to simulate level of worker fatigue. To validate...

  12. Construction management of Indian pressurized heavy water reactors

    International Nuclear Information System (INIS)

    Bohra, S.A.; Sharma, P.D.

    2006-01-01

    efforts are focused on further reduction of gestation period. This is in contrast to construction period of 7-14 years in the earlier projects with labour intensive construction methods, learning period and indigenisation. The schedule and cost are interrelated and ultimately determine the viability and competitive edge of a project. With rich experience of over 30 years of operation and construction management it is well established that setting up of nuclear power projects in India in 4-5 years is quite feasible because of tremendous developments in construction technology; mechanization, parallel civil works and equipment erection, computerized project monitoring and accounting systems. By considering the best achieved times for the critical path activities of previous and ongoing projects, even a 4-year schedule is achievable. For nuclear power to be competitive it is essential that the gestation period is reduced and the capacity utilization enhanced. Both of these are the goals of the Indian nuclear power program. Presently the overnight cost per kW installed capacity is in the range of US$ 1100-1300 with levellised tariff of 5 c/kWh

  13. Advanced construction methods for new nuclear power plants

    International Nuclear Information System (INIS)

    Bilbao y Leon, Sama; Cleveland, John; Moon, Seong-Gyun; Tyobeka, Bismark

    2009-01-01

    The length of the construction and commissioning phases of nuclear power plants have historically been longer than for conventional fossil fuelled plants, often having a record of delays and cost overruns as a result from several factors including legal interventions and revisions of safety regulations. Recent nuclear construction projects however, have shown that long construction periods for nuclear power plants are no longer the norm. While there are several inter-related factors that influence the construction time, the use of advanced construction techniques has contributed significantly to reducing the construction length of recent nuclear projects. (author)

  14. [Childhood periodic syndromes].

    Science.gov (United States)

    Cuvellier, J-C; Lépine, A

    2010-01-01

    This review focuses on the so-called "periodic syndromes of childhood that are precursors to migraine", as included in the Second Edition of the International Classification of Headache Disorders. Three periodic syndromes of childhood are included in the Second Edition of the International Classification of Headache Disorders: abdominal migraine, cyclic vomiting syndrome and benign paroxysmal vertigo, and a fourth, benign paroxysmal torticollis is presented in the Appendix. The key clinical features of this group of disorders are the episodic pattern and intervals of complete health. Episodes of benign paroxysmal torticollis begin between 2 and 8 months of age. Attacks are characterized by an abnormal inclination and/or rotation of the head to one side, due to cervical dystonia. They usually resolve by 5 years. Benign paroxysmal vertigo presents as sudden attacks of vertigo, accompanied by inability to stand without support, and lasting seconds to minutes. Age at onset is between 2 and 4 years, and the symptoms disappear by the age of 5. Cyclic vomiting syndrome is characterized in young infants and children by repeated stereotyped episodes of pernicious vomiting, at times to the point of dehydration, and impacting quality of life. Mean age of onset is 5 years. Abdominal migraine remains a controversial issue and presents in childhood with repeated stereotyped episodes of unexplained abdominal pain, nausea and vomiting occurring in the absence of headache. Mean age of onset is 7 years. Both cyclic vomiting syndrome and abdominal migraine are noted for the absence of pathognomonic clinical features but also for the large number of other conditions to be considered in their differential diagnoses. Diagnostic criteria, such as those of the Second Edition of the International Classification of Headache Disorders and the North American Society for Pediatric Gastroenterology, Hepatology and Nutrition, have made diagnostic approach and management easier. Their diagnosis

  15. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  16. The periodic system of chemical elements: old and new developments

    International Nuclear Information System (INIS)

    Kibler, M.

    1987-09-01

    Some historical facts about the construction of a periodic system of chemical elements are reviewed. The Madelung rule is used to generate an unusual format for the periodic table. Following the work of Byakov, Kulakov, Rumer and Fet, such a format is further refined on the basis of a chain of groups starting with SU(2)xS0(4.2)

  17. Nonparametric Inference for Periodic Sequences

    KAUST Repository

    Sun, Ying; Hart, Jeffrey D.; Genton, Marc G.

    2012-01-01

    the periodogram, a widely used tool for period estimation. The CV method is computationally simple and implicitly penalizes multiples of the smallest period, leading to a "virtually" consistent estimator of integer periods. This estimator is investigated both

  18. Periodic safety analyses; Les essais periodiques

    Energy Technology Data Exchange (ETDEWEB)

    Gouffon, A; Zermizoglou, R

    1990-12-01

    The IAEA Safety Guide 50-SG-S8 devoted to 'Safety Aspects of Foundations of Nuclear Power Plants' indicates that operator of a NPP should establish a program for inspection of safe operation during construction, start-up and service life of the plant for obtaining data needed for estimating the life time of structures and components. At the same time the program should ensure that the safety margins are appropriate. Periodic safety analysis are an important part of the safety inspection program. Periodic safety reports is a method for testing the whole system or a part of the safety system following the precise criteria. Periodic safety analyses are not meant for qualification of the plant components. Separate analyses are devoted to: start-up, qualification of components and materials, and aging. All these analyses are described in this presentation. The last chapter describes the experience obtained for PWR-900 and PWR-1300 units from 1986-1989.

  19. Prognosis environmental effects durable construction; Prognose Milieu-effecten Duurzaam Bouwen

    Energy Technology Data Exchange (ETDEWEB)

    Crommentuijn, L.E.M.; Verbeek, E.D.M.

    1999-07-01

    The Ministry of Housing, Spatial Planning and the Environment (VROM) commissioned RIVM to assess the environmental effect of the policy measures for sustainable construction, for the period 1995 - 2020. This study assesses the environmental effects of technical measures for the reduction of energy use, water use and the use of materials in existing and new dwellings and utility buildings. Two models have been developed, one for dwellings and one for utility buildings (only for the sectors health, education, offices and retail trade). With these models technical measures of the National Packet Sustainable Building for the reduction of energy, water use and the use of materials in existing and new dwellings and buildings can be assessed. Behavioral changes have not been included in the models. In order to calculate the effects the measures with regard to sustainable construction have been equipped with penetration scenarios. These penetration scenarios are explicated in consultation with experts (in the fields of policy and construction). For the dwellings in the Netherlands a reduction of energy use for space heating with approximately 15% is calculated. As a result the CO2-emission related to space heating will also decline. In utility buildings the energy use per m2 gross ground area will decline. As a result of the increase in ground area for most of the sectors in utility buildings the energy use (and the resulting CO2-emission) will be stable. The reduction of water use in dwellings is much larger than in utility buildings. This is a result of the much larger possibilities of water reduction in dwellings as compared to utility buildings. The reduction of material use has also been assessed in the prognosis. In the near future environmental profit will be gained in the recycling of materials for buildings, for instance for shingle, gypsum and PVC. In the reduction of harmful emissions, for instance for volatile organic compounds and heavy metals. In the durable

  20. Predictors of Hearing Protection Use in Construction Workers

    OpenAIRE

    Edelson, Jane; Neitzel, Richard; Meischke, Hendrika; Daniell, William; Sheppard, Lianne; Stover, Bert; Seixas, Noah

    2009-01-01

    Objectives: Although noise-induced hearing loss is completely preventable, it remains highly prevalent among construction workers. Hearing protection devices (HPDs) are commonly relied upon for exposure reduction in construction, but their use is complicated by intermittent and highly variable noise, inadequate industry support for hearing conservation, and lax regulatory enforcement.

  1. Ergonomic measures in construction work: enhancing evidence-based implementation

    NARCIS (Netherlands)

    Visser, S.

    2015-01-01

    Despite the development and availability of ergonomic measures in the construction industry, the number of construction workers reporting high physical work demands remains high. A reduction of the high physical work demands can be achieved by using ergonomic measures. However, these ergonomic

  2. Wall Construction; Carpentry: 901892.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in floor and wall layout, and in the diverse methods and construction of walls. Upon completion of this course the students should have acquired a knowledge of construction plans and structural foundations in addition to a basic knowledge of mathematics. The course consists of…

  3. Safety in construction?

    NARCIS (Netherlands)

    Swuste, P.H.J.J.

    2013-01-01

    The available literature on Construction Safety is not very optimistic about the chances of evidence-based safety in the construction industry exerting a positive influence. Many articles indicate that the structures and processes that are designed to ensure safety in the industry are poor. Safety

  4. INDOT Construction Inspection Priorities

    Science.gov (United States)

    2012-05-01

    In the last decade, the Indiana Department of Transportation (INDOT) has experienced an increase in their construction projects (e.g., INDOTs : construction spending was $789 million in 2006 and increased to $1,081.4 million in 2010); while the le...

  5. Employment and winter construction

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Larsen, Jacob Norvig

    2011-01-01

    Reduced seasonal building activity in the construction sector is often assumed to be related to hard winter conditions for building activities and poor working conditions for construction workers, resulting in higher costs and poor quality of building products, particularly in the northern hemisp...... of contracts for workers is more likely to explain differences in seasonal activity than climatic or technological factors....

  6. Governmentalities of Construction

    DEFF Research Database (Denmark)

    Gottlieb, Stefan; Jensen, Jens Stissing

    2016-01-01

    In this paper, we apply Foucault’s concept of governmentality in a dual analysis of the formation and transformation of the construction sector and the construction worker. The governmentality concept is well-suited for such an analysis as it directs attention to the ways in which control is the ...

  7. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Baddley, A.H.

    1981-01-01

    A method of constructing a radiation shielding plug for use in the roof of the coolant containment vault of liquid metal cooled fast breeder reactors is described. The construction allows relative movement of that part of service cables and pipes which are carried by the fixed roof and that part which is carried by the rotatable plug. (U.K.)

  8. Constructional and Conceptual Composition

    Science.gov (United States)

    Dodge, Ellen Kirsten

    2010-01-01

    Goldberg's (1995) recognition that, in addition to various word-level constructions, sentences also instantiate meaningful argument structure constructions enables a non-polysemy-based analysis of various verb 'alternations' (Levin 1993). In such an analysis, meaning variations associated with the use of the same verb in different argument…

  9. Personal Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmensen, Torkil; Hornbæk, Kasper

    2011-01-01

    Whereas the concept of usability is predominantly defined analytically, people relate to systems through personal usability constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected by two factors crucial to the international development...

  10. Industrialization for sustainable construction?

    NARCIS (Netherlands)

    Egmond - de Wilde De Ligny, van E.L.C.; Barrett, P; Amaratunga, D.; Haigh, R; Keraminiyage, K.; Pathirage, C

    2010-01-01

    Sustainable construction (SuCo), which genesis dates in the early 1990’s, advocates the creation and operation of a quality and healthy built environment based on resource efficiency, life cycle economics and ecological principles. (Kibert, 2003). Currently the Construction Industry does not meet

  11. Microbial reductive dehalogenation.

    Science.gov (United States)

    Mohn, W W; Tiedje, J M

    1992-01-01

    A wide variety of compounds can be biodegraded via reductive removal of halogen substituents. This process can degrade toxic pollutants, some of which are not known to be biodegraded by any other means. Reductive dehalogenation of aromatic compounds has been found primarily in undefined, syntrophic anaerobic communities. We discuss ecological and physiological principles which appear to be important in these communities and evaluate how widely applicable these principles are. Anaerobic communities that catalyze reductive dehalogenation appear to differ in many respects. A large number of pure cultures which catalyze reductive dehalogenation of aliphatic compounds are known, in contrast to only a few organisms which catalyze reductive dehalogenation of aromatic compounds. Desulfomonile tiedjei DCB-1 is an anaerobe which dehalogenates aromatic compounds and is physiologically and morphologically unusual in a number of respects, including the ability to exploit reductive dehalogenation for energy metabolism. When possible, we use D. tiedjei as a model to understand dehalogenating organisms in the above-mentioned undefined systems. Aerobes use reductive dehalogenation for substrates which are resistant to known mechanisms of oxidative attack. Reductive dehalogenation, especially of aliphatic compounds, has recently been found in cell-free systems. These systems give us an insight into how and why microorganisms catalyze this activity. In some cases transition metal complexes serve as catalysts, whereas in other cases, particularly with aromatic substrates, the catalysts appear to be enzymes. Images PMID:1406492

  12. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  13. VENTILATION NEEDS DURING CONSTRUCTION

    International Nuclear Information System (INIS)

    C.R. Gorrell

    1998-01-01

    The purpose of this analysis is to determine ventilation needs during construction and development of the subsurface repository and develop systems to satisfy those needs. For this analysis, construction is defined as pre-emplacement excavation and development is excavation that takes place simultaneously with emplacement. The three options presented in the ''Overall Development and Emplacement Ventilation Systems'' analysis (Reference 5.5) for development ventilation will be applied to construction ventilation in this analysis as well as adding new and updated ventilation factors to each option for both construction and development. The objective of this analysis is to develop a preferred ventilation system to support License Application Design. The scope of this analysis includes: (1) Description of ventilation conditions; (2) Ventilation factors (fire hazards, dust control, construction logistics, and monitoring and control systems); (3) Local ventilation alternatives; (4) Global ventilation options; and (5) Evaluation of options

  14. Active3 noise reduction

    International Nuclear Information System (INIS)

    Holzfuss, J.

    1996-01-01

    Noise reduction is a problem being encountered in a variety of applications, such as environmental noise cancellation, signal recovery and separation. Passive noise reduction is done with the help of absorbers. Active noise reduction includes the transmission of phase inverted signals for the cancellation. This paper is about a threefold active approach to noise reduction. It includes the separation of a combined source, which consists of both a noise and a signal part. With the help of interaction with the source by scanning it and recording its response, modeling as a nonlinear dynamical system is achieved. The analysis includes phase space analysis and global radial basis functions as tools for the prediction used in a subsequent cancellation procedure. Examples are given which include noise reduction of speech. copyright 1996 American Institute of Physics

  15. Dimensional reduction in quantum gravity

    Energy Technology Data Exchange (ETDEWEB)

    Hooft, G [Rijksuniversiteit Utrecht (Netherlands). Inst. voor Theoretische Fysica

    1994-12-31

    The requirement that physical phenomena associated with gravitational collapse should be duly reconciled with the postulates of quantum mechanics implies that at a Planckian scale our world is not 3+1 dimensional. Rather, the observable degrees of freedom can best be described as if they were Boolean variables defined on a two- dimensional lattice, evolving with time. This observation, deduced from not much more than unitarity, entropy and counting arguments, implies severe restrictions on possible models of quantum gravity. Using cellular automata as an example it is argued that this dimensional reduction implies more constraints than the freedom we have in constructing models. This is the main reason why so-far no completely consistent mathematical models of quantum black holes have been found. (author). 13 refs, 2 figs.

  16. Large Constructed Wetlands for Phosphorus Control: A Review

    Directory of Open Access Journals (Sweden)

    Robert H. Kadlec

    2016-06-01

    Full Text Available This paper reviews aspects of the performance of large (>40 ha constructed treatment wetlands intended for phosphorus control. Thirty-seven such wetlands have been built and have good data records, with a median size of 754 ha. All are successfully removing phosphorus from a variety of waters. Period of record median concentration reductions were 71%, load reductions 0.77 gP·m−2·year−1, and rate coefficients 12.5 m·year−1. Large wetlands have a narrower performance spectrum than the larger group of all sizes. Some systems display startup trends, ranging to several years, likely resulting from antecedent soil and vegetation conditions. There are internal longitudinal gradients in concentration, which vary with lateral position and flow conditions. Accretion in inlet zones may require attention. Concentrations are reduced to plateau values, in the range of about 10–50 mgP·m−3. Vegetation type has an effect upon performance measures, and its presence facilitates performance. Trends in the performance measures over the history of individual systems display only small changes, with both increases and decreases occurring. Such trends remove little of the variance in behavior. Seasonality is typically weak for steady flow systems, and most variability appears to be stochastic. Stormwater systems display differences between wet and dry season behavior, which appear to be flow-driven. Several models of system performance have been developed, both steady and dynamic.

  17. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  18. Solid construction waste management in large civil construction companies through use of specific software - case study

    Directory of Open Access Journals (Sweden)

    Caio Dalla Zanna

    2017-05-01

    Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.

  19. Removal of mercury from gold mine effluents using Limnocharis flava in constructed wetlands.

    Science.gov (United States)

    Marrugo-Negrete, José; Enamorado-Montes, Germán; Durango-Hernández, José; Pinedo-Hernández, José; Díez, Sergi

    2017-01-01

    Phytoremediation has received increased attention over the recent decades, as an emerging and eco-friendly approach that utilizes the natural properties of plants to remediate contaminated water, soils or sediments. The current study provides information about a pilot-scale experiment designed to evaluate the potential of the anchored aquatic plant Limnocharis flava for phytoremediation of water contaminated with mercury (Hg), in a constructed wetland (CW) with horizontal subsurface flow (HSSF). Mine effluent used in this experiment was collected from a gold mining area located at the Alacran mine in Colombia (Hg: 0.11 ± 0.03 μg mL -1 ) and spiked with HgNO 3 (1.50 ± 0.09 μg mL -1 ). Over a 30 day test period, the efficiency of the reduction in the heavy metal concentration in the wetlands, and the relative metal sorption by the L. flava, varied according to the exposure time. The continued rate of removal of Hg from the constructed wetland was 9 times higher than the control, demonstrating a better performance and nearly 90% reduction in Hg concentrations in the contaminated water in the presence of L. flava. The results in this present study show the great potential of the aquatic macrophyte L. flava for phytoremediation of Hg from gold mining effluents in constructed wetlands. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. Construction in Occupied Spaces

    Directory of Open Access Journals (Sweden)

    Ward Andrew E.

    2017-06-01

    Full Text Available Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  1. Construction in Occupied Spaces

    Science.gov (United States)

    Ward, Andrew E.; Azhar, Salman; Khalfan, Malik

    2017-06-01

    Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  2. A reduction of the globalization and U(1)-covering

    International Nuclear Information System (INIS)

    Tran Dao Dong.

    1993-03-01

    We suggest a reduction of the globalization and multidimensional quantization to the case of reductive Lie groups by lifting to U(1)-covering. our construction is connected with M. Duflo's third method for algebraic groups. From a reductive datum of the given real algebraic Lie group we firstly construct geometric complexes with respect to U(1)-covering by using the unipotent positive distributions. Then we describe in terms of local cohomology the maximal globalization of Harish-Chandra modules which correspond to the geometric complexes. (author). 9 refs

  3. Applying Groebner bases to solve reduction problems for Feynman integrals

    International Nuclear Information System (INIS)

    Smirnov, Alexander V.; Smirnov, Vladimir A.

    2006-01-01

    We describe how Groebner bases can be used to solve the reduction problem for Feynman integrals, i.e. to construct an algorithm that provides the possibility to express a Feynman integral of a given family as a linear combination of some master integrals. Our approach is based on a generalized Buchberger algorithm for constructing Groebner-type bases associated with polynomials of shift operators. We illustrate it through various examples of reduction problems for families of one- and two-loop Feynman integrals. We also solve the reduction problem for a family of integrals contributing to the three-loop static quark potential

  4. Applying Groebner bases to solve reduction problems for Feynman integrals

    Energy Technology Data Exchange (ETDEWEB)

    Smirnov, Alexander V. [Mechanical and Mathematical Department and Scientific Research Computer Center of Moscow State University, Moscow 119992 (Russian Federation); Smirnov, Vladimir A. [Nuclear Physics Institute of Moscow State University, Moscow 119992 (Russian Federation)

    2006-01-15

    We describe how Groebner bases can be used to solve the reduction problem for Feynman integrals, i.e. to construct an algorithm that provides the possibility to express a Feynman integral of a given family as a linear combination of some master integrals. Our approach is based on a generalized Buchberger algorithm for constructing Groebner-type bases associated with polynomials of shift operators. We illustrate it through various examples of reduction problems for families of one- and two-loop Feynman integrals. We also solve the reduction problem for a family of integrals contributing to the three-loop static quark potential.

  5. Testing periodically integrated autoregressive models

    NARCIS (Netherlands)

    Ph.H.B.F. Franses (Philip Hans); M.J. McAleer (Michael)

    1997-01-01

    textabstractPeriodically integrated time series require a periodic differencing filter to remove the stochastic trend. A non-periodic integrated time series needs the first-difference filter for similar reasons. When the changing seasonal fluctuations for the non-periodic integrated series can be

  6. Construction and Demolition Waste

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund; Andersen, L.

    2011-01-01

    Construction and demolition waste (C&D waste) is the waste generated during the building, repair, remodeling or removal of constructions. The constructions can be roads, residential housing and nonresidential buildings. C&D waste has traditionally been considered without any environmental problems...... should be managed accordingly. Another reason is that it has been documented that a large fraction of C&D waste (about 90 %) can be easily recycled and thus can conserve landfill capacity. C&D waste may conveniently be divided into three subcategories: Buildings, roads and excavations. This chapter...

  7. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  8. Sustainability Base Construction Update

    Science.gov (United States)

    Mewhinney, Michael

    2012-01-01

    Construction of the new Sustainability Base Collaborative support facility, expected to become the highest performing building in the federal government continues at NASA's Ames Research Center, Moffet Field, Calif. The new building is designed to achieve a platinum rating under the leadership in Energy and Environment Design (LEED) new construction standards for environmentally sustainable construction developed by the U. S. Green Building Council, Washington, D. C. When completed by the end of 2011, the $20.6 million building will feature near zero net energy consumption, use 90 percent less potable water than conventionally build buildings of equivalent size, and will result in reduced building maintenance costs.

  9. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  10. Potential for waste reduction

    International Nuclear Information System (INIS)

    Warren, J.L.

    1990-01-01

    The author focuses on wastes considered hazardous under the Resource Conservation and Recovery Act. This chapter discusses wastes that are of interest as well as the factors affecting the quantity of waste considered available for waste reduction. Estimates are provided of the quantities of wastes generated. Estimates of the potential for waste reduction are meaningful only to the extent that one can understand the amount of waste actually being generated. Estimates of waste reduction potential are summarized from a variety of government and nongovernment sources

  11. LDRD report nonlinear model reduction

    Energy Technology Data Exchange (ETDEWEB)

    Segalman, D.; Heinstein, M.

    1997-09-01

    The very general problem of model reduction of nonlinear systems was made tractable by focusing on the very large subclass consisting of linear subsystems connected by nonlinear interfaces. Such problems constitute a large part of the nonlinear structural problems encountered in addressing the Sandia missions. A synthesis approach to this class of problems was developed consisting of: detailed modeling of the interface mechanics; collapsing the interface simulation results into simple nonlinear interface models; constructing system models by assembling model approximations of the linear subsystems and the nonlinear interface models. These system models, though nonlinear, would have very few degrees of freedom. A paradigm problem, that of machine tool vibration, was selected for application of the reduction approach outlined above. Research results achieved along the way as well as the overall modeling of a specific machine tool have been very encouraging. In order to confirm the interface models resulting from simulation, it was necessary to develop techniques to deduce interface mechanics from experimental data collected from the overall nonlinear structure. A program to develop such techniques was also pursued with good success.

  12. Construction of an access shaft for LEP

    CERN Document Server

    1983-01-01

    The main contract for underground work in the plain was signed end of February 1983. It foresaw a five-month preparation period before the order to start construction work could be issued. The latter was delivered on 1 September. See Annual Report 1983 p. 114

  13. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  14. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  15. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  16. Caltrans : construction manual

    Science.gov (United States)

    2009-08-01

    Caltrans intends this manual as a resource for all personnel engaged in contract administration. The manual establishes policies and procedures for the construction phase of Caltrans projects. However, this manual is not a contract document. It impos...

  17. Lead in Construction

    National Research Council Canada - National Science Library

    1993-01-01

    Although Occupational Safety and Health Administration (OSHA) regulations for occupational lead exposure have been in effect since 1971 for the construction and general industries, the agency regulations for general industry in 1978...

  18. On Construction Grammar

    Institute of Scientific and Technical Information of China (English)

    XIAO Kunxue

    2005-01-01

    Constructionist approach with its brand-new perspective has begun to demonstrate its dynamic power. This paper attempts to review the basic ideas, achievements and comparison with generative grammar of Construction Grammar and generalize some problems and future research prospects.

  19. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  20. Skin Problems in Construction

    Science.gov (United States)

    ... you work with… Wet cement or plaster Abrasive cleaners Paints Adhesives Chemical solvents These materials can contain ... health hazards construction workers face on the job. Production of this card was supported by Grant OH009762 ...

  1. Passive solar construction handbook

    Energy Technology Data Exchange (ETDEWEB)

    Levy, E.; Evans, D.; Gardstein, C.

    1981-08-01

    Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

  2. Photovoltaic roof construction

    Energy Technology Data Exchange (ETDEWEB)

    Hawley, W.W.

    1980-02-26

    In a batten-seam roof construction employing at least one photovoltaic cell module, the electrical conduits employed with the at least one photovoltaic cell module are disposed primarily under the battens of the roof.

  3. Ship construction and welding

    CERN Document Server

    Mandal, Nisith R

    2017-01-01

    This book addresses various aspects of ship construction, from ship types and construction materials, to welding technologies and accuracy control. The contents of the book are logically organized and divided into twenty-one chapters. The book covers structural arrangement with longitudinal and transverse framing systems based on the service load, and explains basic structural elements like hatch side girders, hatch end beams, stringers, etc. along with structural subassemblies like floors, bulkheads, inner bottom, decks and shells. It presents in detail double bottom construction, wing tanks & duct keels, fore & aft end structures, etc., together with necessary illustrations. The midship sections of various ship types are introduced, together with structural continuity and alignment in ship structures. With regard to construction materials, the book discusses steel, aluminum alloys and fiber reinforced composites. Various methods of steel material preparation are discussed, and plate cutting and form...

  4. Construction and material specification

    Science.gov (United States)

    2002-01-01

    These Construction and Material Specifications are written to the Bidder before award of the : Contract and to the Contractor after award of the Contract. The sentences that direct the Contractor to perform Work are written as commands. For example, ...

  5. The ACR: Advanced design features for a short construction schedule

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.

    2003-01-01

    Building on the successful CANDU construction at Qinshan, the ACR-700 is designed with constructability considerations as a major requirement during all project phases from the concept design stage to the detail design stage. A project schedule of 48 months has been developed for the nth ACR unit with a 36 months construction period from First Concrete to Fuel Load. This paper describes some of the advanced design features implemented in the reactor building design in order to achieve this short construction period. These features include large volume concrete pours, prefabricated rebar, composite structures, prefabricated permanent formwork and significant modularization and prefabrication

  6. Breast reduction (mammoplasty) - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100189.htm Breast reduction (mammoplasty) - series—Indications To use the sharing features ... Lickstein, MD, FACS, specializing in cosmetic and reconstructive plastic surgery, Palm Beach Gardens, FL. Review provided by ...

  7. Medical Errors Reduction Initiative

    National Research Council Canada - National Science Library

    Mutter, Michael L

    2005-01-01

    The Valley Hospital of Ridgewood, New Jersey, is proposing to extend a limited but highly successful specimen management and medication administration medical errors reduction initiative on a hospital-wide basis...

  8. [Vaginitis and vaginosis. Comparison of two periods].

    Science.gov (United States)

    Ceruti, M; Canestrelli, M; Piantelli, G; Amone, F; Condemi, V; De Paolis, P; Ludovici, G; Somenzi, P

    1993-10-01

    Vaginitis is the most frequent gynecological disease. It is characterized by objective and subjective signs of inflammation and differs from bacterial vaginosis (BV) which is an abnormal condition of the vaginal ecosystem caused by the excessive growth of aerobic and anaerobic flora normally present in the vagina with an increased risk of pelvic inflammatory disease (PID). The authors report the results of a study carried out at the Centre for Gynecological Infections at the Clinic of Obstetrics and Gynecology of the University of Parma. 828 patients were enrolled in the study during the period 1985-86 and 1559 patients during the two-year period 1991-92. The aim of the study was to evaluate variations in epidemiological data for vaginitis and bacterial vaginosis in the two periods examined. No significant changes were observed (p > 0.05) with regard to the prevalence of Ca, Tv and BV forms. On the other hand, there was a significant reduction (p vaginitis and BV showed a reduction of other microorganisms and an increase in negative vaginal swabs in adults (> 20 years old).

  9. Constructive Consumer Choice Processes.

    OpenAIRE

    Bettman, James R; Luce, Mary Frances; Payne, John W

    1998-01-01

    Consumer decision making has been a focal interest in consumer research, and consideration of current marketplace trends ( e.g., technological change, an information explosion) indicates that this topic will continue to be critically important. We argue that consumer choice is inherently constructive. Due to limited processing capacity, consumers often do not have well-defined existing preferences, but construct them using a variety of strategies contingent on task demands. After describing c...

  10. ATLAS construction status

    International Nuclear Information System (INIS)

    Jenni, P.

    2006-01-01

    The ATLAS detector is being constructed at the LHC, in view of a data-taking startup in 2007. This report concentrates on the progress and the technical challenges of the detector construction, and summarizes the status of the work as of August 2004. The project is on track to allow the highly motivated ATLAS Collaboration to enter into a new exploratory domain of high-energy physics in 2007. (author)

  11. International Construction Measurement Standard

    OpenAIRE

    Mitchell, Charles

    2016-01-01

    The International Construction Measurement Standard Coalition (the Coalition) was formed on 17 June 2015 after meeting at the International Monetary Fund in Washington DC, USA. The Coalition, comprising the organisations listed below at the date of publication, aims to bring about consistency in construction cost reporting standards internationally. This is achieved by the creation and adoption of this ICMS, an agreed international standard for the structuring and presentation of cost reports...

  12. Quality during construction

    International Nuclear Information System (INIS)

    Rogers, C.B.

    1977-01-01

    This paper outlines the quality assurance program used by Bechtel Corp. in constructing Nuclear Power Plants. As a tool for scheduling and visualizing situations during construction, power plant scale models are used. The use of models, preplanning, detail scheduling, and early development of procedures and inspection plans, have all contributed to a lower cost integrated quality program. Quality control and quality assurance are built in, thus satisfying the regulatory requirements

  13. Coset space dimensional reduction of gauge theories

    Energy Technology Data Exchange (ETDEWEB)

    Kapetanakis, D. (Physik Dept., Technische Univ. Muenchen, Garching (Germany)); Zoupanos, G. (CERN, Geneva (Switzerland))

    1992-10-01

    We review the attempts to construct unified theories defined in higher dimensions which are dimensionally reduced over coset spaces. We employ the coset space dimensional reduction scheme, which permits the detailed study of the resulting four-dimensional gauge theories. In the context of this scheme we present the difficulties and the suggested ways out in the attempts to describe the observed interactions in a realistic way. (orig.).

  14. Coset space dimensional reduction of gauge theories

    International Nuclear Information System (INIS)

    Kapetanakis, D.; Zoupanos, G.

    1992-01-01

    We review the attempts to construct unified theories defined in higher dimensions which are dimensionally reduced over coset spaces. We employ the coset space dimensional reduction scheme, which permits the detailed study of the resulting four-dimensional gauge theories. In the context of this scheme we present the difficulties and the suggested ways out in the attempts to describe the observed interactions in a realistic way. (orig.)

  15. Microbial reductive dehalogenation.

    OpenAIRE

    Mohn, W W; Tiedje, J M

    1992-01-01

    A wide variety of compounds can be biodegraded via reductive removal of halogen substituents. This process can degrade toxic pollutants, some of which are not known to be biodegraded by any other means. Reductive dehalogenation of aromatic compounds has been found primarily in undefined, syntrophic anaerobic communities. We discuss ecological and physiological principles which appear to be important in these communities and evaluate how widely applicable these principles are. Anaerobic commun...

  16. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    Science.gov (United States)

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  17. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  18. Upper Limit of the Periodic Table and Synthesis of Superheavy Elements

    Directory of Open Access Journals (Sweden)

    Khazan A.

    2007-04-01

    Full Text Available For the first time, using the heaviest possible element, the diagram for known nuclides and stable isotopes is constructed. The direction of search of superheavy elements is indicated. The Periodic Table with an eighth period is tabulated.

  19. Air Layer Drag Reduction

    Science.gov (United States)

    Ceccio, Steven; Elbing, Brian; Winkel, Eric; Dowling, David; Perlin, Marc

    2008-11-01

    A set of experiments have been conducted at the US Navy's Large Cavitation Channel to investigate skin-friction drag reduction with the injection of air into a high Reynolds number turbulent boundary layer. Testing was performed on a 12.9 m long flat-plate test model with the surface hydraulically smooth and fully rough at downstream-distance-based Reynolds numbers to 220 million and at speeds to 20 m/s. Local skin-friction, near-wall bulk void fraction, and near-wall bubble imaging were monitored along the length of the model. The instrument suite was used to access the requirements necessary to achieve air layer drag reduction (ALDR). Injection of air over a wide range of air fluxes showed that three drag reduction regimes exist when injecting air; (1) bubble drag reduction that has poor downstream persistence, (2) a transitional regime with a steep rise in drag reduction, and (3) ALDR regime where the drag reduction plateaus at 90% ± 10% over the entire model length with large void fractions in the near-wall region. These investigations revealed several requirements for ALDR including; sufficient volumetric air fluxes that increase approximately with the square of the free-stream speed, slightly higher air fluxes are needed when the surface tension is reduced, higher air fluxes are required for rough surfaces, and the formation of ALDR is sensitive to the inlet condition.

  20. Determination of Flood Reduction Alternatives for Climate Change Adaptation in Gyeongancheon basin

    Science.gov (United States)

    Han, D.; Joo, H. J.; Jung, J.; Kim, H. S.

    2017-12-01

    Recently, the frequency of extreme rainfall event has increased due to the climate change and the impermeable area in an urban watershed has also increased due to the rapid urbanization. Therefore, the flood risk is increasing and we ought to prepare countermeasures for flood damage reduction. For the determination of appropriate measures or alternatives, firstly, this study estimated the frequency based rainfall considering the climate change according to the each target period(reference : 1971˜2010, Target period Ⅰ : 2011˜2040, Target period Ⅱ : 2041˜2070, Target period Ⅲ : 2071˜2100). Then the future flood discharge was computed by using HEC-HMS model. We set 5 sizes of drainage pumps and detention ponds respectively as the flood reduction alternatives and the flood level in the river was obtained by each alternative through HEC-RAS model. The flood inundation map was constructed using topographical data and flood water level in the river and the economic analysis was conducted for the flood damage reduction studies using Multi Dimensional Flood Damage Analysis (MD-FDA) tool. As a result of the effectiveness analysis of the flood reduction alternatives, the flood level by drainage pump was reduced by 0.06m up to 0.44m while it was reduced by 0.01m up to 1.86m in the case of the detention pond. The flooded area was shrunk by up to 32.64% from 0.3% and inundation depth was also dropped. As a result of a comparison of the Benefit/Cost ratio estimated by the economic analysis, a detention pond E in the target period Ⅰ and the pump D in the periods Ⅱ and Ⅲ were considered as the appropriate alternatives for the flood damage reduction under the climate change. AcknowledgementsThis research was supported by Basic Science Research Program through the National Research Foundation of Korea(NRF) funded by the Ministry of Science, ICT & Future Planning(2017R1A2B3005695)

  1. Construction and start-up testing experience of Kashiwazakikariwa Nuclear Power Station Unit No.1

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Murakami, Hideaki

    1986-01-01

    In order to overcome the new location condition in Japan Sea coast, new techniques were developed and adopted to ensure the safety in construction and to shorten the construction period as far as possible. The commercial operation was started on September 18, 1985. This plant is a BWR plant of 1100 MWe output. The results of the improvement and standardization of BWRs and the measures for reliability improvement and radiation dose reduction were fully adopted in this plant. The site of the power station and the layout of the main facilities are explained. As the features of the location condition, the severe weather condition in winter such as snow, wind and lightning and high waves in the sea were considered. The rockbed for installing the foundation of the reactor building was deep, and the aseismatic design condition was made stricter, accordingly, the quantity of materials increased. A tent dome was developed to cover above the reactor containment vessel being assembled, a lightning forecast system was installed, and synchro-lift method was adopted for caisson breakwaters. The countermeasures to the deep rockbed and the measures to shorten the construction period were taken. The results of the trial operation are reported. (Kako, I.)

  2. Periodical cicadas: A minimal automaton model

    Science.gov (United States)

    de O. Cardozo, Giovano; de A. M. M. Silvestre, Daniel; Colato, Alexandre

    2007-08-01

    The Magicicada spp. life cycles with its prime periods and highly synchronized emergence have defied reasonable scientific explanation since its discovery. During the last decade several models and explanations for this phenomenon appeared in the literature along with a great deal of discussion. Despite this considerable effort, there is no final conclusion about this long standing biological problem. Here, we construct a minimal automaton model without predation/parasitism which reproduces some of these aspects. Our results point towards competition between different strains with limited dispersal threshold as the main factor leading to the emergence of prime numbered life cycles.

  3. Time requirement for barium reduction in intussusception

    International Nuclear Information System (INIS)

    Hwang, Hye Eun; Kim, Seung Ho; Kang, In Young; Park, Byoung Lan; Kim, Byoung Geun

    1988-01-01

    During the period between January 1985 and December 1987, barium reduction was performed in 146 cases of intussusception who were admitted to Kwangju Christian Hospital. The results were as follows: 1. Success rate to the symptom duration is relatively constant. 2. The success rate in infants with severe dehydration was 50% but it was gradually increased in infants with moderate dehydration and in infants with mild dehydration, 83.3% and 100% respectively. 3. The success rate of 12 cases in severely dehydrated infants with positive dissection sign was 16.7%. 4. The success rate of 15 cases in moderately dehydrated infants with positive dissection sign was 66.7%. 5. The average time requirement for barium reduction was 58.3 minutes. No serious complications were noted during barium reduction, except mild vomiting. 6. With above results, it is desirable that barium reduction should be performed according to the patient's physical status and radiologic findings.

  4. The niche construction perspective: a critical appraisal.

    Science.gov (United States)

    Scott-Phillips, Thomas C; Laland, Kevin N; Shuker, David M; Dickins, Thomas E; West, Stuart A

    2014-05-01

    Niche construction refers to the activities of organisms that bring about changes in their environments, many of which are evolutionarily and ecologically consequential. Advocates of niche construction theory (NCT) believe that standard evolutionary theory fails to recognize the full importance of niche construction, and consequently propose a novel view of evolution, in which niche construction and its legacy over time (ecological inheritance) are described as evolutionary processes, equivalent in importance to natural selection. Here, we subject NCT to critical evaluation, in the form of a collaboration between one prominent advocate of NCT, and a team of skeptics. We discuss whether niche construction is an evolutionary process, whether NCT obscures or clarifies how natural selection leads to organismal adaptation, and whether niche construction and natural selection are of equivalent explanatory importance. We also consider whether the literature that promotes NCT overstates the significance of niche construction, whether it is internally coherent, and whether it accurately portrays standard evolutionary theory. Our disagreements reflect a wider dispute within evolutionary theory over whether the neo-Darwinian synthesis is in need of reformulation, as well as different usages of some key terms (e.g., evolutionary process). © 2013 The Author(s). Evolution published by Wiley Periodicals, Inc. on behalf of The Society for the Study of Evolution.

  5. Periodic feedback stabilization for linear periodic evolution equations

    CERN Document Server

    Wang, Gengsheng

    2016-01-01

    This book introduces a number of recent advances regarding periodic feedback stabilization for linear and time periodic evolution equations. First, it presents selected connections between linear quadratic optimal control theory and feedback stabilization theory for linear periodic evolution equations. Secondly, it identifies several criteria for the periodic feedback stabilization from the perspective of geometry, algebra and analyses respectively. Next, it describes several ways to design periodic feedback laws. Lastly, the book introduces readers to key methods for designing the control machines. Given its coverage and scope, it offers a helpful guide for graduate students and researchers in the areas of control theory and applied mathematics.

  6. Modularization Technology in Power Plant Construction

    International Nuclear Information System (INIS)

    Kenji Akagi; Kouichi Murayama; Miki Yoshida; Junichi Kawahata

    2002-01-01

    Since the early 1980's, Hitachi has been developing and applying modularization technology to domestic nuclear power plant construction, and has achieved great rationalization. Modularization is one of the plant construction techniques which enables us to reduce site labor by pre-assembling components like equipment, pipes, valves and platforms in congested areas and installing them using large capacity cranes for cost reduction, better quality, safety improvement and shortening of construction time. In this paper, Hitachi's modularization technologies are described especially from with respect to their sophisticated design capabilities. The application of 3D-CAD at the detailed layout design stage, concurrent design environment achieved by the computer network, module design quantity control and the management system are described. (authors)

  7. The redoubtable ecological periodic table

    Science.gov (United States)

    Ecological periodic tables are repositories of reliable information on quantitative, predictably recurring (periodic) habitat–community patterns and their uncertainty, scaling and transferability. Their reliability derives from their grounding in sound ecological principle...

  8. STIMULATION OF CONSTRUCTION OF AFFORDABLE HOUSING BY REFORMATION OF A CONSTRUCTION COMPLEX MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    BRONEVYTSKYI S. P.

    2015-10-01

    Full Text Available Purpose. Development of offers on stimulation of construction of affordable housing by reformation of a construction complex management system. Methodology. The revelation of the problems of planning of construction in large cities. The analysis of forming of structure of a build complex management in soviet times and in a transitional period. The revelation of the modern, actual, socio-economic problems of the construction activity management. Proposition on the improvement of methods of construction management in cities of Ukraine. Results. The methods of a construction complex management in countries with a market economy as for building of affordable housing are shown. Originality. In composition of a town-planning documentations, except for the norms of the common use of territories of city (density of population of micro region, the maximum parameters of a construction examining of land areas are proposed to determine: building percent and coefficient of maximum superficial area. Practical value. The principle of management and organization of construction is norms of a build use of territories for building of mass affordable housing for funds of population and investors while providing of the comfort of housing in accordance with state construction norms.

  9. Periodically distributed objects with quasicrystalline diffraction pattern

    Energy Technology Data Exchange (ETDEWEB)

    Wolny, Janusz, E-mail: wolny@fis.agh.edu.pl; Strzalka, Radoslaw [Faculty of Physics and Applied Computer Science, AGH University of Science and Technology, al. Mickiewicza 30, 30-059 Krakow (Poland); Kuczera, Pawel [Faculty of Physics and Applied Computer Science, AGH University of Science and Technology, al. Mickiewicza 30, 30-059 Krakow (Poland); Laboratory of Crystallography, ETH Zurich, Wolfgang-Pauli-Strasse 10, CH-8093 Zurich (Switzerland)

    2015-03-30

    It is possible to construct fully periodically distributed objects with a diffraction pattern identical to the one obtained for quasicrystals. These objects are probability distributions of distances obtained in the statistical approach to aperiodic structures distributed periodically. The diffraction patterns have been derived by using a two-mode Fourier transform—a very powerful method not used in classical crystallography. It is shown that if scaling is present in the structure, this two-mode Fourier transform can be reduced to a regular Fourier transform with appropriately rescaled scattering vectors and added phases. Detailed case studies for model sets 1D Fibonacci chain and 2D Penrose tiling are discussed. Finally, it is shown that crystalline, quasicrystalline, and approximant structures can be treated in the same way.

  10. Computer integrated construction at AB building in reprocessing plant

    International Nuclear Information System (INIS)

    Takami, Masahiro; Azuchi, Takehiro; Sekiguchi, Kenji

    1999-01-01

    JNFL (Japan Nuclear Fuel Limited) is now processing with construction of the spent nuclear fuel reprocessing plant at Rokkasho Village in Aomori Prefecture, which is coming near to the busiest period of construction. Now we are trying to complete the civil work of AB Building and KA Building in a very short construction term by applying CIC (Computer Integrated Construction) concept, in spite of its hard construction conditions, such as the massive and complicated building structure, interferences with M and E (Mechanical and Electrical) work, severe winter weather, remote site location, etc. The key technologies of CIC are three-dimensional CAD, information network, and prefabrication and mechanization of site work. (author)

  11. Radiology residents' experience with intussusception reduction

    International Nuclear Information System (INIS)

    Bateni, Cyrus; Stein-Wexler, Rebecca; Wootton-Gorges, Sandra L.; Li, Chin-Shang

    2011-01-01

    Residents should be exposed to adequate procedural volume to act independently upon completion of training. Informal inquiry led us to question whether residents encounter enough intussusception reductions to become comfortable with the procedure. We sought to determine radiology residents' exposure to intussusception reductions, and whether their experiences vary by region or institution. U.S. radiology residency program directors were asked to encourage their residents to complete a 12-question online survey describing characteristics of their pediatric radiology department, experiences with intussusception reduction, and confidence in their own ability to perform the procedure. Six hundred sixty-four residents responded during the study period. Of those, 308 (46.4%) had not experienced an intussusception reduction, and 228 (34%) had experienced only one or two. Twenty-two percent of fourth-year residents had never experienced an intussusception reduction, and 21% had experienced only one. Among second- through fourth-year residents, only 99 (18.3%) felt confident that they could competently reduce an intussusception (P < 0.0001), and 336 (62.2%) thought they would benefit from a computer-assisted training model simulating intussusception reduction (P < 0.0001). Radiology residents have limited opportunity to learn intussusception reduction and therefore lack confidence. Most think they would benefit from additional training with a computer-simulation model. (orig.)

  12. Construction Worker Fatigue Prediction Model Based on System Dynamic

    Directory of Open Access Journals (Sweden)

    Wahyu Adi Tri Joko

    2017-01-01

    Full Text Available Construction accident can be caused by internal and external factors such as worker fatigue and unsafe project environment. Tight schedule of construction project forcing construction worker to work overtime in long period. This situation leads to worker fatigue. This paper proposes a model to predict construction worker fatigue based on system dynamic (SD. System dynamic is used to represent correlation among internal and external factors and to simulate level of worker fatigue. To validate the model, 93 construction workers whom worked in a high rise building construction projects, were used as case study. The result shows that excessive workload, working elevation and age, are the main factors lead to construction worker fatigue. Simulation result also shows that these factors can increase worker fatigue level to 21.2% times compared to normal condition. Beside predicting worker fatigue level this model can also be used as early warning system to prevent construction worker accident

  13. Construction time of PWRs

    Energy Technology Data Exchange (ETDEWEB)

    Carajilescov, Pedro; Moreira, Joao M.L., E-mail: pedro.carajilescov@ufabc.edu.b, E-mail: joao.moreira@ufabc.edu.b [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil). Center of Engineering, Modeling and Applied Social Sciences

    2011-07-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  14. Construction time of PWRs

    International Nuclear Information System (INIS)

    Carajilescov, Pedro; Moreira, Joao M.L.

    2011-01-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  15. Constructive renormalization theory

    International Nuclear Information System (INIS)

    Rivasseau, Vincent

    2000-01-01

    These notes are the second part of a common course on Renormalization Theory given with Professor P. da Veiga. I emphasize here the rigorous non-perturbative or constructive aspects of the theory. The usual formalism for the renormalization group in field theory or statistical mechanics is reviewed, together with its limits. The constructive formalism is introduced step by step. Taylor forest formulas allow to perform easily the cluster and Mayer expansions which are needed for a single step of the renormalization group in the case of Bosonic theories. The iteration of this single step leads to further difficulties whose solution is briefly sketched. The second part of the course is devoted to Fermionic models. These models are easier to treat on the constructive level so they are very well suited to beginners in constructive theory. It is shown how the Taylor forest formulas allow to reorganize perturbation theory nicely in order to construct the Gross-Neveu 2 model without any need for cluster or Mayer expansions. Finally applications of this technique to condensed matter and renormalization group around Fermi surface are briefly reviewed. (author)

  16. ITER towards the construction

    International Nuclear Information System (INIS)

    Shimomura, Y.

    2005-01-01

    The ITER Project has been significantly developed in the last few years in preparation for its construction. The ITER Participant's Negotiators have developed the Joint Implementation Agreement (JIA), ready for finalisation following selection of the construction site and nomination of the project's Director General. The ITER International Team and Participant Teams have continued technical and organisational preparations. Construction will be able to start immediately after the international ITER organisation is established, following signature of the JIA. The Project is strongly supported by the governments of the Participants as well as by the scientific community. The real negotiations, including siting and the final details of cost sharing, started in December 2003. The EU, with Cadarache, and Japan, with Rokkasho, have both promised large contributions to the project to strongly support their construction site proposals. Their wish to host ITER construction is too strong to allow convergence to a single site considering the ITER device in isolation. A broader collaboration among the Parties is therefore being contemplated, covering complementary activities to help accelerate fusion development towards a viable power source, and allow the Participants to reach a conclusion on ITER siting. This report reviews these preparations, and the status of negotiations

  17. PIK reactor construction status

    International Nuclear Information System (INIS)

    Konoplev, K.A.; Smolsky, S.L.

    2001-01-01

    The 100MW reactor PIK for fundamental researches has a thermal neutron flux of more than 10 15 n/cm 2 sec. This presentation outlines the construction state as of 2001, its prospects and completion tactics in the conditions of unstable finance. Construction of the reactor started in 1976. In 1986 construction of the building was completed and significant part of the installation work fulfilled. Construction of cooling systems was finished, the control panel assembled, and adjustment of the pump and gate valve control circuits started. After Chernobyl catastrophe, the USSR nuclear reactor safety requirements were revised. The PIK design did not meet these requirements and underwent considerable revision. The reconstruction design resulted in double the initial cost. Creation of the containment was the bulkiest part of the reconstruction. It brought about the need to disassemble the roofing of the building, dismantle all the equipment of the two upper floors, and lay up the equipment of the lower floors. As of 2001, construction in accordance with the revised design is at the stage of assemblage of the most important units, i.e. reactor itself, cooling system, heavy water system, and a number of auxiliary systems, such as depleted fuel storage, emergency cooling system etc. (orig.)

  18. A novel methodology to estimate the evolution of construction waste in construction sites.

    Science.gov (United States)

    Katz, Amnon; Baum, Hadassa

    2011-02-01

    This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m(2) of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2m(3) per 1m(2) floor area. A good correlation was found between the model predictions and actual data from the field survey. Copyright © 2010 Elsevier Ltd. All rights reserved.

  19. Change of radiation conditions at the ''Ukryttya' object after pitching of arch construction

    International Nuclear Information System (INIS)

    Jegorov, V.V.; Morozov, Yu.V.; Pavlovs'kij, L.Yi.; Kholodyuk, A.O.

    2017-01-01

    Individual measurements of dose rate (DR) capacity values were performed on the outer surfaces (roof) of object ''Ukryttya'', in local zone both before and after pitching of Arch construction (Arch) as well as study the characteristics of angular distribution of gamma radiation intensity at those areas. A comparative analysis of results obtained was performed. At all measuring points after Arch pitching a reduction of DR value, depending on area of research, was observed.Measurements were being performed during the period from 16.11.2016 till 18.01.2017

  20. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  1. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    Science.gov (United States)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  2. Progress in resolving construction issues on nuclear projects

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1985-01-01

    The cost of nuclear plant construction in the United States can be drastically reduced. Progress is being made in the reduction of construction costs and with continuing effort much more can be done. The easiest way to attack high costs is to eliminate the unnecessary repairs and rework in construction, along with the time consuming evaluations and dispositions, and to use common sense in design practices. By doing this, millions of dollars could easily be cut from the cost of construction of nuclear powerplants

  3. Labor construction trends

    International Nuclear Information System (INIS)

    McCall, H.W.

    1976-01-01

    The increasing costs and schedule delays being experienced in construction projects have led companies to look for alternatives to their present methods of expansion. One of the facets being evaluated is the construction labor posture. As a result, more companies are employing open shop contractors. Certain benefits can be realized by open shop construction. Productivity, in terms of the time required and overall costs, is definitely improved at no sacrifice in quality. Before an owner decides to build a project open shop, however, he must be fully aware of the pro's and con's of both types of labor posture. He must know to select a capable open shop contractor and he must realize his obligations for a successful open shop program

  4. Reliability and construction control

    Directory of Open Access Journals (Sweden)

    Sherif S. AbdelSalam

    2016-06-01

    Full Text Available The goal of this study was to determine the most reliable and efficient combination of design and construction methods required for vibro piles. For a wide range of static and dynamic formulas, the reliability-based resistance factors were calculated using EGYPT database, which houses load test results for 318 piles. The analysis was extended to introduce a construction control factor that determines the variation between the pile nominal capacities calculated using static versus dynamic formulae. From the major outcomes, the lowest coefficient of variation is associated with Davisson’s criterion, and the resistance factors calculated for the AASHTO method are relatively high compared with other methods. Additionally, the CPT-Nottingham and Schmertmann method provided the most economic design. Recommendations related to a pile construction control factor were also presented, and it was found that utilizing the factor can significantly reduce variations between calculated and actual capacities.

  5. Quantum theory without reduction

    International Nuclear Information System (INIS)

    Cini, Marcello; Levy-Leblond, J.-M.

    1990-01-01

    Quantum theory offers a strange, and perhaps unique, case in the history of science. Although research into its roots has provided important results in recent years, the debate goes on. Some theorists argue that quantum theory is weakened by the inclusion of the so called 'reduction of the state vector' in its foundations. Quantum Theory without Reduction presents arguments in favour of quantum theory as a consistent and complete theory without this reduction, and which is capable of explaining all known features of the measurement problem. This collection of invited contributions defines and explores different aspects of this issue, bringing an old debate into a new perspective, and leading to a more satisfying consensus about quantum theory. (author)

  6. Dam construction in salt rock

    International Nuclear Information System (INIS)

    Stockmann, N.; Beinlich, A.; Flach, D.; Jockwer, N.; Klarr, K.; Krogmann, P.; Miehe, R.; Schmidt, M.W.; Schwaegermann, H.F.; Walter, F.; Yaramanci, U.

    1991-11-01

    Barriers are a major component of the satefy concept for the Gorleben repository. The construction and performance of dams are currently tested within the framework of a project carried out in the Asse salt mine. A measuring programme has been established to give evidence of the sealing capacities of a barrier consisting of an abatement, long-term sealing material, and a hydraulic sealing system. Tests are to be made to verify the barrier's performance for shorter of long time periods (up to about 500 years). The tests are assisted by computed models established for the project. The long-term safety aspects to be studied include such conditions as permeability changes due to mechanical impacts, circulation conditions at the roadside, and the serviceable life and efficiency of the sealing components. (DG) [de

  7. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  8. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  9. Periodic waves in nonlinear metamaterials

    International Nuclear Information System (INIS)

    Liu, Wen-Jun; Xiao, Jing-Hua; Yan, Jie-Yun; Tian, Bo

    2012-01-01

    Periodic waves are presented in this Letter. With symbolic computation, equations for monochromatic waves are studied, and analytic periodic waves are obtained. Factors affecting properties of periodic waves are analyzed. Nonlinear metamaterials, with the continuous distribution of the dielectric permittivity obtained, are different from the ones with the discrete distribution. -- Highlights: ► Equations for the monochromatic waves in transverse magnetic polarization have been studied. ► Analytic periodic waves for the equations have been obtained. ► Periodic waves are theoretically presented and studied in the nonlinear metamaterials.

  10. INFANTILISM: THEORETICAL CONSTRUCT AND OPERATIONALIZATION

    Directory of Open Access Journals (Sweden)

    Yelena V. Sabelnikova

    2016-01-01

    Full Text Available The aim of the presented research is to define and operationalize theoretically the concept of infantilism and its construct. The content of theoretical construct «infantilism» is analyzed. Methods. The methods of theoretical research involve analysis and synthesis. The age and content criteria are analysed in the context of childhood and adulthood. The traits which can be interpreted as adult infantile traits are described. Results. The characteristics of adult infantilism in modern world taking into account the increasing of information flows and socio-economic changes are defined. The definition of the concept «infantilism» including its main features is given. Infantilism is defined as the personal organization including features and models of the previous age period not adequate for the real age stage with emphasis on immaturity of the emotional and volitional sphere. Scientific novelty. The main psychological characteristics of adulthood are described as the reflection, requirement to work and professional activity, existence of professional self-determination, possession of labor skills, need for selfrealization, maturity of the emotional and volitional sphere. As objective adulthood characteristics are considered the following: transition to economic and territorial independence of a parental family, and also development of new social roles, such as a worker, spouse, and parent. Two options of a possible operationalization of concept are allocated: objective (existence / absence in real human life of objective criteria of adulthood and subjective (the self-report on subjective feeling of existence / lack of psychological characteristics of adulthood. Practical significance consists in a construct operationalization of «infantilism» which at the moment has so many interpretations. That operationalization is necessary for the further analysis and carrying out various researches. 

  11. REDUCTIONS WITHOUT REGRET: SUMMARY

    Energy Technology Data Exchange (ETDEWEB)

    Swegle, J.; Tincher, D.

    2013-09-16

    This paper briefly summarizes the series in which we consider the possibilities for losing, or compromising, key capabilities of the U.S. nuclear force in the face of modernization and reductions. The first of the three papers takes an historical perspective, considering capabilities that were eliminated in past force reductions. The second paper is our attempt to define the needed capabilities looking forward in the context of the current framework for force modernization and the current picture of the evolving challenges of deterrence and assurance. The third paper then provides an example for each of our undesirable outcomes: the creation of roach motels, box canyons, and wrong turns.

  12. Nonparametric Inference for Periodic Sequences

    KAUST Repository

    Sun, Ying

    2012-02-01

    This article proposes a nonparametric method for estimating the period and values of a periodic sequence when the data are evenly spaced in time. The period is estimated by a "leave-out-one-cycle" version of cross-validation (CV) and complements the periodogram, a widely used tool for period estimation. The CV method is computationally simple and implicitly penalizes multiples of the smallest period, leading to a "virtually" consistent estimator of integer periods. This estimator is investigated both theoretically and by simulation.We also propose a nonparametric test of the null hypothesis that the data have constantmean against the alternative that the sequence of means is periodic. Finally, our methodology is demonstrated on three well-known time series: the sunspots and lynx trapping data, and the El Niño series of sea surface temperatures. © 2012 American Statistical Association and the American Society for Quality.

  13. Construction Management Meets Today's Realities.

    Science.gov (United States)

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  14. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  15. PWR plant construction in Japan

    International Nuclear Information System (INIS)

    Tamura, Toshifumi

    2002-01-01

    The construction methods based on the experiences on the Nuclear Island, which is a critical path in the total construction schedule, have been studied and reconsidered in order to construct by more reliable and economical method. So various improved construction method are being applied and the duration of construction is being reduced continuously. So various improved construction method are being applied and the duration of construction is being reduced continuously. In this paper, the history of construction of twenty-three (23) PWR Plant, the actual construction methods and schedule of Ohi-3/4, to which the many improved methods were applied during their construction, are introduced mainly with the improved points for previously constructed plants. And also the situation of construction method for the next PWR Plant is simply explained

  16. Primary circuit water chemistry during shutdown period at Kalinin NPP

    International Nuclear Information System (INIS)

    Gorbatenko, S.; Otchenashev, G.; Yurmanov, V.

    2005-01-01

    The primary circuit water chemistry feature at Kalinin NPP is using of special up-dated regime during the period of unit shutdown for refueling. The main objective of up-dated regime is removing from the circuit long time living corrosion products on SVO-2 ion exchange filters with the purpose of dose rates reduction from the equipment and in such a way reduction of maintenance personnel overexposure. (N.T.)

  17. Positive periodic solutions of delayed periodic Lotka-Volterra systems

    International Nuclear Information System (INIS)

    Lin Wei; Chen Tianping

    2005-01-01

    In this Letter, for a general class of delayed periodic Lotka-Volterra systems, we prove some new results on the existence of positive periodic solutions by Schauder's fixed point theorem. The global asymptotical stability of positive periodic solutions is discussed further, and conditions for exponential convergence are given. The conditions we obtained are weaker than the previously known ones and can be easily reduced to several special cases

  18. Periodic permanent magnet focusing system with high peak field

    International Nuclear Information System (INIS)

    Zhang Hong; Liu Weiwei; Bai Shuxin; Chen Ke

    2008-01-01

    In this study, hybrid periodic permanent magnet (PPM) system is studied, which has high axial magnetic field and low magnetic leakage. By simulation computation, some laws of magnetic field distribution vs. structure dimensions were obtained. A hybrid PPM is designed and constructed whose peak field reaches 0.6 T. The factors inducing discrepancies between computational results and practical measurements are analyzed. The magnetic field distribution is very sensitive to the variations of constructional parameters. Construction accuracy greatly influences the magnetic field distribution. Research results obtained here are potentially valuable for future work

  19. Construction contract risk and reasonable evasions

    International Nuclear Information System (INIS)

    Wu Yunpeng

    2012-01-01

    Construction project has the characteristics such as large-scale investment, long-period implementation, excessive uncertainties,a single piece of production, etc. These characteristics determine the complexity of a construction project contract. To guarantee the time limit and quality of a project, finding ways to reduce and evade the contract risks as well as avoid unnecessary disputes are urgent requirements for each project manager. According to the practical situation, project contract risks are analyzed and illustrated in detail, and the concrete solutions for evading those risks are put forward. (authors)

  20. Gentilly 2: design, construction and commissioning

    International Nuclear Information System (INIS)

    Amyot, Paul; Michel, Benoit.

    1982-06-01

    Construction of the Gentilly 2 power station is essentially complete, and commissioning is proceeding. The main activities during the 1981-82 period have been the completion of the construction and overall testing of the major systems. One cause of delay in the project in 1981 was the discovery of damage to the tubesheet of a steam generator. An internal manhole cover support in the steam generator head had become loose and had caused damage to the tube-to-tubesheet welds. Repairs to the welds were completed in Feb. 1982 after an extensive development program to qualify the welding procedure. Overall project life will be slightly more than 9 years

  1. Design and construction of nuclear power plants

    CERN Document Server

    Schnell, Jürgen; Meiswinkel, Rüdiger; Bergmeister, Konrad; Fingerloos, Frank; Wörner, Johann-Dietrich

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply.Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overv

  2. Photolysis of Periodate and Periodic Acid in Aqueous Solution

    DEFF Research Database (Denmark)

    Sehested, Knud; Kläning, U. K.

    1978-01-01

    The photochemistry of periodate and periodic acid in aqueous solution was studied (i) by quantum yield measurements at low light intensity (ii) by flash photolysis, and (iii) by photolysis of glassy samples at 77 K. The photochemical studies were supplemented with pulse radiolysis studies...... of aqueous periodate solutions and with kinetic studies using stopped-flow technique. In strongly alkaline solution the photodecomposition of periodate proceeds via formation of O– and IVI. At pH solution O3 P is formed in a small...

  3. Development of silver nanoparticles loaded chitosan-alginate constructs with biomedical potentialities.

    Science.gov (United States)

    Bilal, Muhammad; Rasheed, Tahir; Iqbal, Hafiz M N; Li, Chuanlong; Hu, Hongbo; Zhang, Xuehong

    2017-12-01

    Herein, a facile biosynthesis of silver nanoparticles (AgNPs) and AgNPs-loaded chitosan-alginate constructs with biomedical potentialities is reported. The UV-vis spectroscopic profile confirmed the synthesis of AgNPs using methanolic leaves extract of Euphorbia helioscopia. The newly developed AgNPs were characterized using various analytical and imaging techniques including UV-vis and FT-IR spectroscopy, X-ray diffraction (XRD), scanning electron microscopy (SEM), energy dispersive spectroscopy (EDS), atomic force microscopy (AFM), and transmission electron microscopy (TEM). The optimally yielded AgNPs at 24h reaction period were loaded onto various chitosan-alginate constructs. A maximum of 95% loading efficiency (LE) was recorded with a chitosan: alginate ratio at 2:1, followed by 81% at 2:2 ratios. The anti-bacterial activities of AgNPs and AgNPs loaded chitosan-alginate constructs were tested against six bacterial strains i.e. Staphylococcus aureus, Pseudomonas aeruginosa, Klebsiella pneumoniae, Acinetobacter baumannii, Morganella morganii and Haemophilus influenza. A significant reduction in the log values was recorded for all test constructs, in comparison to the initial bacterial count (control value, i.e., 1.5×10 8 CFU/mL). The cytotoxicity profile revealed complete biocompatibility against normal cell line i.e. L929. Almost all constructs showed considerable cytotoxicity up to certain extant against human epithelial cells (HeLa) cancer cells. In summary, the highest antibacterial activities along with anti-cancer behavior both suggest the biomedical potentialities of newly engineered AgNPs and AgNPs-loaded chitosan-alginate constructs. Copyright © 2017 Elsevier B.V. All rights reserved.

  4. The building study 2003. The basis for development and adaptation of programs in order to promote energy reduction and consumption of renewable energy within the construction sector[Norway]; Byggstudien 2003. Grunnlag for utvikling og tilpassing av programmer for aa fremme energireduksjon og bruk av fornybar energi innenfor byggenaeringen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The building study is based on the views in the construction sector regarding energy conservation in buildings. The most important problems for discussion with the business were how Enova should cooperate with the sector, what energy carriers there are, how large the potential for energy conservation is and transformation and what measures Enova should use. Energy and energy efficient buildings are not very much focused upon. Through application processes in the existing programs there has development a view that the program has not quite reached the desired target groups. This mainly includes new construction activities and refurbishing. The programs for education and energy management have had a good response and are expected to result in a yearly energy conservation effect of approx. 1.5 TWh in 2010. The project includes information on the new conditions in the sector, investment and operational requirements. Calculations show that buildings may be constructed much more energy efficiently with moderate additional investments. The potential is estimated to approx. 1.4 TWh within 2010 including the potential within refurbishing. The national standards and regulations must give plain requirements to en energy efficiency and consumption in the buildings. In addition the energy marking systems may be good measures in order to promote the construction of energy efficient buildings. There is a need for information and education on energy consumption in all layers of the business. The report suggests the use of supporting measures in order to stimulate the management for energy conservation in buildings. (tk)

  5. Constructive Preference Elicitation

    Directory of Open Access Journals (Sweden)

    Paolo Dragone

    2018-01-01

    Full Text Available When faced with large or complex decision problems, human decision makers (DM can make costly mistakes, due to inherent limitations of their memory, attention, and knowledge. Preference elicitation tools assist the decision maker in overcoming these limitations. They do so by interactively learning the DM’s preferences through appropriately chosen queries and suggesting high-quality outcomes based on the preference estimates. Most state-of-the-art techniques, however, fail in constructive settings, where the goal is to synthesize a custom or entirely novel configuration rather than choosing the best option among a given set of candidates. Many wide-spread problems are constructive in nature: customizing composite goods such as cars and computers, bundling products, recommending touristic travel plans, designing apartments, buildings, or urban layouts, etc. In these settings, the full set of outcomes is humongous and can not be explicitly enumerated, and the solution must be synthesized via constrained optimization. In this article, we describe recent approaches especially designed for constructive problems, outlining the underlying ideas and their differences as well as their limitations. In presenting them, we especially focus on novel issues that the constructive setting brings forth, such as how to deal with sparsity of the DM’s preferences, how to properly frame the interaction, and how to achieve efficient synthesis of custom instances.

  6. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  7. ACCELERATING CONSTRUCTION INDUSTRY DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Mohan M. Kumaraswamy

    2006-06-01

    Full Text Available The needs for construction industry development are initially viewed from the broader perspectives of imperatives for infrastructure development and national development. All these are clearly more critical in developing countries. A non-exhaustive set of potential drivers and common barriers to construction industry development is identified from previous research. These suggest the usefulness of consolidating a cluster of recent proposals and exercises aiming at (a construction organization development in terms of an over-arching management support system model, as well as improved information and knowledge management; and (b project team development in the context of relationally integrated teams and supply chains, joint risk management and ‘technology and knowledge exchange’ in joint ventures, as well as longer term public private partnerships. These apparently disparate research thrusts are threaded together into a pattern that may inspire, if not feed, specific research and development (R & D agendas for construction industry development in different countries according to their own priorities, constraints and stages of infrastructure and national development.

  8. Constructions of Peripherality

    DEFF Research Database (Denmark)

    Carter, Helen Frances Lindsay

    2013-01-01

    In this paper I focus on the concept of peripheralisation. In particular, I consider how peripheries can be discursively constructed in the debates surrounding planning cases, and how this might serve to legitimate particular interests. This is related to the case of a proposed golf resort...

  9. Nanotechnologies for sustainable construction

    DEFF Research Database (Denmark)

    Geiker, Mette Rica; Andersen, Maj Munch

    2009-01-01

    This chapter aims to highlight key aspects and recent trends in the development and application of nanotechnology to facilitate sustainable construction, use and demolition of buildings and infrastructure structures, ‘nanoconstruction’. Nanotechnology is not a technology but a very diverse...

  10. Provability Calculus of Constructions

    DEFF Research Database (Denmark)

    Nyblad, Kasten

    This thesis presents a type system, Provability Calculus of Constructions (PCoC) that can be used for the formalization of logic. In a theorem prover based on the system, the user can extend the prover with new inference rules in a logically consistent manner. This is done by representing PCo...

  11. KARATE WITH CONSTRUCTIVE LEARNING

    Directory of Open Access Journals (Sweden)

    Srikrishna Karanam

    2012-02-01

    Full Text Available Any conventional learning process involves the traditional hierarchy of garnering of information and then recall gathered information. Constructive learning is an important research area having wide impact on teaching methods in education, learning theories, and plays a major role in many education reform movements. It is observed that constructive learning advocates the interconnection between emotions and learning. Human teachers identify the emotions of students with varying degrees of accuracy and can improve the learning rate of the students by motivating them. In learning with computers, computers also should be given the capability to recognize emotions so as to optimize the learning process. Image Processing is a very popular tool used in the process of establishing the theory of Constructive Learning. In this paper we use the Optical Flow computation in image sequences to analyze the accuracy of the moves of a karate player. We have used the Lucas-Kanade method for computing the optical flow in image sequences. A database consisting of optical flow images by a group of persons learning karate is formed and the learning rates are analyzed in order to main constructive learning. The contours of flow images are compared with the standard images and the error graphs are plotted. Analysis of the emotion of the amateur karate player is made by observing the error plots.

  12. Mortality table construction

    Science.gov (United States)

    Sutawanir

    2015-12-01

    Mortality tables play important role in actuarial studies such as life annuities, premium determination, premium reserve, valuation pension plan, pension funding. Some known mortality tables are CSO mortality table, Indonesian Mortality Table, Bowers mortality table, Japan Mortality table. For actuary applications some tables are constructed with different environment such as single decrement, double decrement, and multiple decrement. There exist two approaches in mortality table construction : mathematics approach and statistical approach. Distribution model and estimation theory are the statistical concepts that are used in mortality table construction. This article aims to discuss the statistical approach in mortality table construction. The distributional assumptions are uniform death distribution (UDD) and constant force (exponential). Moment estimation and maximum likelihood are used to estimate the mortality parameter. Moment estimation methods are easier to manipulate compared to maximum likelihood estimation (mle). However, the complete mortality data are not used in moment estimation method. Maximum likelihood exploited all available information in mortality estimation. Some mle equations are complicated and solved using numerical methods. The article focus on single decrement estimation using moment and maximum likelihood estimation. Some extension to double decrement will introduced. Simple dataset will be used to illustrated the mortality estimation, and mortality table.

  13. Constructions in Wonderland

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard; Shibuya, Yoshikata

    -gram analysis to some different texts, including Lewis Carroll's 1865 novel Alice's Adventures in Wonderland (AW), Mark Twain's 1884/5 novel The Adventures of Huckleberry Finn (HF), and some US presidential speeches, to identify frequently (co)occurring words that may be indicative of underlying constructions...

  14. Constructing Regional advantage

    DEFF Research Database (Denmark)

    Asheim, Bjørn T.; Boschma, Ron; Cooke, Phil

    2011-01-01

    This paper presents a regional innovation policy model based on the idea of constructing regional advantage. This policy model brings together concepts like related variety, knowledge bases and policy platforms. Related variety attaches importance to knowledge spillovers across complementary...... economic development within and between regions in action lines appropriate to incorporate the basic principles behind related variety and differentiated knowledge bases....

  15. Predictable grammatical constructions

    DEFF Research Database (Denmark)

    Lucas, Sandra

    2015-01-01

    My aim in this paper is to provide evidence from diachronic linguistics for the view that some predictable units are entrenched in grammar and consequently in human cognition, in a way that makes them functionally and structurally equal to nonpredictable grammatical units, suggesting that these p......My aim in this paper is to provide evidence from diachronic linguistics for the view that some predictable units are entrenched in grammar and consequently in human cognition, in a way that makes them functionally and structurally equal to nonpredictable grammatical units, suggesting...... that these predictable units should be considered grammatical constructions on a par with the nonpredictable constructions. Frequency has usually been seen as the only possible argument speaking in favor of viewing some formally and semantically fully predictable units as grammatical constructions. However, this paper...... semantically and formally predictable. Despite this difference, [méllo INF], like the other future periphrases, seems to be highly entrenched in the cognition (and grammar) of Early Medieval Greek language users, and consequently a grammatical construction. The syntactic evidence speaking in favor of [méllo...

  16. AA under construction

    CERN Multimedia

    CERN PhotoLab

    1979-01-01

    The AA at an early stage of construction, in the newly built AA-Hall. Cable-trays already outline the shape of the accumulator ring. To the right are huge cable-drums for the pulse-forming-network (PFN) of the injection kicker. Seeing this picture, can one imagine that only 8 months later beams were circulating in the completed accumulator ring ?

  17. Housing and construction

    Science.gov (United States)

    Delton Alderman

    2014-01-01

    OECD economies, in aggregate, have been sluggish; unemployment remains high in several countries, and minimal gross domestic product gains are forecast for the Euro area through 2016. Recession, sovereign debt problems and lethargic economies continue to constrain Europe’s housing construction market; no improvement is expected before 2015 or...

  18. Patterns of Knowledge Construction

    Science.gov (United States)

    Chang, Bo

    2018-01-01

    The purpose of this study was to identify knowledge construction patterns in a local learning community. Observation, documents, and semistructured interviews were employed to collect data. Twenty learners were interviewed. Data were analyzed inductively using the constant comparative method. Five major patterns--radiation, circulation,…

  19. Neuroeconomics: Constructing identity

    NARCIS (Netherlands)

    Davis, J.B.

    2010-01-01

    The paper asks whether neuroeconomics will make instrumental use of neuroscience to adjudicate existing disputes in economics or be more seriously transformed by neuroscience in ways that might transform economics. The paper pursues the question by asking how neuroscience constructs an understanding

  20. Construction of monophase nets

    International Nuclear Information System (INIS)

    Suarez A, Jose Antonio

    1996-01-01

    The paper refers to the use of monophase loads in commercial residential urbanizations and in small industries, for this reason it is considered unnecessary the construction of three-phase nets. The author makes a historical recount of these nets in Bogota, his capacities, uses and energy savings

  1. Anyonic FRT construction

    International Nuclear Information System (INIS)

    Majid, S.; Rodriguez-Plaza, M.J.

    1994-01-01

    The Faddeev-Reshetikhin-Takhtajan method to construct matrix bialgebras from non-singular solutions of the quantum Yang-Baxter equation is extended to the anyonic or Z n -graded case. The resulting anyonic quantum matrices are braided groups in which the braiding is given by a phase factor. (orig.)

  2. Reduction of dinitrogen ligands

    International Nuclear Information System (INIS)

    Richards, R.L.

    1983-01-01

    Processes of dinitrogen ligand reduction in complexes of transition metals are considered. The basic character of the dinitrogen ligand is underlined. Data on X-ray photoelectronic spectroscopy and intensities of bands ν (N 2 ) in IR-spectra of nitrogen complexes are given. The mechanism of protonation of an edge dinitrogen ligand is discussed. Model systems and mechanism of nitrogenogenase are compared

  3. Infinitary Combinatory Reduction Systems

    DEFF Research Database (Denmark)

    Ketema, Jeroen; Simonsen, Jakob Grue

    2011-01-01

    We define infinitary Combinatory Reduction Systems (iCRSs), thus providing the first notion of infinitary higher-order rewriting. The systems defined are sufficiently general that ordinary infinitary term rewriting and infinitary ¿-calculus are special cases. Furthermore,we generalise a number...

  4. Galactorrhea after reduction mammaplasty

    NARCIS (Netherlands)

    Schuurman, A. H.; Assies, J.; van der Horst, C. M.; Bos, K. E.

    1993-01-01

    A case of extremely painful swelling of the breasts following a reduction mammaplasty is presented. There were no signs of an abscess or hematoma. A milky white fluid due to galactorrhea was evacuated at operation, and further galactorrhea was inhibited by medication. The pathogenesis of

  5. (MTT) dye reduction assay.

    African Journals Online (AJOL)

    to inhibit proliferation of HeLa cells was determined using the 3443- dimethylthiazol-2-yl)-2,5-diphenyl-tetrazolium bromide (MTT) dye reduction assay. Extracts from roots of Agathisanthemum bojeri, Synaptolepis kirkii and Zanha africana and the leaf extract of Physalis peruviana at a concentration of 10 pg/ml inhibited cell ...

  6. Streaming Reduction Circuit

    NARCIS (Netherlands)

    Gerards, Marco Egbertus Theodorus; Kuper, Jan; Kokkeler, Andre B.J.; Molenkamp, Egbert

    2009-01-01

    Reduction circuits are used to reduce rows of floating point values to single values. Binary floating point operators often have deep pipelines, which may cause hazards when many consecutive rows have to be reduced. We present an algorithm by which any number of consecutive rows of arbitrary lengths

  7. Federal Environmental Requirements for Construction

    Data.gov (United States)

    Department of Veterans Affairs — This guide provides information on federal environmental requirements for construction projects. It is written primarily for owners of construction projects and for...

  8. Information systems for material flow management in construction processes

    Science.gov (United States)

    Mesároš, P.; Mandičák, T.

    2015-01-01

    The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.

  9. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  10. Indigenous lunar construction materials

    Science.gov (United States)

    Rogers, Wayne P.; Sture, Stein

    1991-01-01

    The utilization of local resources for the construction and operation of a lunar base can significantly reduce the cost of transporting materials and supplies from Earth. The feasibility of processing lunar regolith to form construction materials and structural components is investigated. A preliminary review of potential processing methods such as sintering, hot-pressing, liquification, and cast basalt techniques, was completed. The processing method proposed is a variation on the cast basalt technique. It involves liquification of the regolith at 1200-1300 C, casting the liquid into a form, and controlled cooling. While the process temperature is higher than that for sintering or hot-pressing (1000-1100 C), this method is expected to yield a true engineering material with low variability in properties, high strength, and the potential to form large structural components. A scenario for this processing method was integrated with a design for a representative lunar base structure and potential construction techniques. The lunar shelter design is for a modular, segmented, pressurized, hemispherical dome which could serve as habitation and laboratory space. Based on this design, estimates of requirements for power, processing equipment, and construction equipment were made. This proposed combination of material processing method, structural design, and support requirements will help to establish the feasibility of lunar base construction using indigenous materials. Future work will refine the steps of the processing method. Specific areas where more information is needed are: furnace characteristics in vacuum; heat transfer during liquification; viscosity, pouring and forming behavior of molten regolith; design of high temperature forms; heat transfer during cooling; recrystallization of basalt; and refinement of estimates of elastic moduli, compressive and tensile strength, thermal expansion coefficient, thermal conductivity, and heat capacity. The preliminary

  11. Spontaneous reduction of prolactinoma post cabergoline withdrawal

    Directory of Open Access Journals (Sweden)

    Sampath Kumar Venkatesh

    2012-01-01

    Full Text Available Prolactinomas are common pituitary tumors usually highly responsive to dopamine agonists. Around 70-90% of the prolactinomas exhibit decrease in tumor size, though variably with these agents. Uncommonly, there may be little or no shrinkage in pituitary tumor. In the absence of medical therapy, pituitary apoplexy may also result in tumor shrinkage, albeit rarely. We report here a case showing only modest reduction in prolactinoma with cabergoline given for a period of one and a half years. Surprisingly, this tumor showed a 40% reduction in the tumor size 3 months after cabergoline withdrawal in the absence of clinical or radiological evidence of apoplexy.

  12. Innovative quality management practices in the Dutch construction industry

    NARCIS (Netherlands)

    Bossink, B.A.G.

    2002-01-01

    Quality management practices do support the management of strategically important innoυation processes. This conclusion is based on empirical research in the Dutch construction industry. A large-scale innovative construction project is intensively studied during a three-year period. The quality

  13. Sulphate reduction experiment: SURE-1

    International Nuclear Information System (INIS)

    Pedersen, K.; Arlinger, J.; Bengtsson, A.; Edlund, J.; Eriksson, L.; Hallbeck, L.; Johansson, J.; Paeaejaervi, A.; Rabe, L.

    2013-11-01

    It was previously concluded that opposing gradients of sulphate and methane, observations of 16S rDNA sequences displaying great similarity to those of anaerobic methane-oxidizing Archaea, and a peak in sulphide concentration in groundwater from a depth of 250-350 m in Olkiluoto, Finland, indicated proper conditions for methane oxidation with sulphate. In the present research (SURE-1), pressure-resistant, gas-tight circulating systems were constructed to enable the investigation of attached and unattached anaerobic microbial populations from a depth of 327 m in Olkiluoto under in situ pressure (2.4 MPa), diversity, dissolved gas, and hydrochemical conditions of groundwater station ONKPVA6. Three parallel flow cell cabinets were configured to allow observation of the influence on microbial metabolic activity of 11 mM methane, 11 mM methane plus 10 mM H 2 , or 2.1 mM O 2 plus 7.9 mM N 2 (i.e., air). The concentrations of these gases and of organic acids and carbon, sulphur chemistry, pH and E h , ATP, numbers of cultivable microorganisms, and total numbers of cells and bacteriophages were subsequently recorded under batch conditions for 105 d. The system containing H 2 and methane displayed microbial reduction of 0.7 mM sulphate to sulphide, while the system containing only methane produced 0.2 mM reduced sulphate. The system containing added air became inhibited and displayed no signs of microbial activity. Added H 2 and methane induced increasing numbers of lysogenic bacteriophages per cell. It appears possible that a microbial anaerobic methane-oxidizing process coupled to acetate formation and sulphate reduction may be ongoing in aquifers at a depth of 250-350 m in Olkiluoto, but clear evidence of such an AOM process was not obtained. (orig.)

  14. Sulphate reduction experiment: SURE-1

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, K.; Arlinger, J.; Bengtsson, A.; Edlund, J.; Eriksson, L.; Hallbeck, L.; Johansson, J.; Paeaejaervi, A.; Rabe, L. [Microbial Analytics Sweden AB, Moelnlycke (Sweden)

    2013-11-15

    It was previously concluded that opposing gradients of sulphate and methane, observations of 16S rDNA sequences displaying great similarity to those of anaerobic methane-oxidizing Archaea, and a peak in sulphide concentration in groundwater from a depth of 250-350 m in Olkiluoto, Finland, indicated proper conditions for methane oxidation with sulphate. In the present research (SURE-1), pressure-resistant, gas-tight circulating systems were constructed to enable the investigation of attached and unattached anaerobic microbial populations from a depth of 327 m in Olkiluoto under in situ pressure (2.4 MPa), diversity, dissolved gas, and hydrochemical conditions of groundwater station ONKPVA6. Three parallel flow cell cabinets were configured to allow observation of the influence on microbial metabolic activity of 11 mM methane, 11 mM methane plus 10 mM H{sub 2}, or 2.1 mM O{sub 2} plus 7.9 mM N{sub 2} (i.e., air). The concentrations of these gases and of organic acids and carbon, sulphur chemistry, pH and E{sub h}, ATP, numbers of cultivable microorganisms, and total numbers of cells and bacteriophages were subsequently recorded under batch conditions for 105 d. The system containing H{sub 2} and methane displayed microbial reduction of 0.7 mM sulphate to sulphide, while the system containing only methane produced 0.2 mM reduced sulphate. The system containing added air became inhibited and displayed no signs of microbial activity. Added H{sub 2} and methane induced increasing numbers of lysogenic bacteriophages per cell. It appears possible that a microbial anaerobic methane-oxidizing process coupled to acetate formation and sulphate reduction may be ongoing in aquifers at a depth of 250-350 m in Olkiluoto, but clear evidence of such an AOM process was not obtained. (orig.)

  15. Constructing Private Governance

    International Development Research Centre (IDRC) Digital Library (Canada)

    It is an evidence-based treaty that sets out objectives and principles that parties ... The articles of the convention include demand reduction measures like tax ... the direct economic costs attributable to tobacco use in Malaysia, estimated at .... The analytical framework used in Chapter 1, based on the established practice of ...

  16. Sulphate reduction in the Aespoe HRL tunnel

    International Nuclear Information System (INIS)

    Gustafson, G.; Pedersen, K.; Tullborg, E.L.; Wallin, B.; Wikberg, P.

    1995-12-01

    Evidence and indications of sulphate reduction based on geological, hydrogeological, groundwater, isotope and microbial data gathered in and around the Aespoe Hard Rock Laboratory tunnel have been evaluated. This integrated investigation showed that sulphate reduction had taken place in the past but is most likely also an ongoing process. Anaerobic sulphate-reducing bacteria can live in marine sediments, in the tunnel sections under the sea and in deep groundwaters, since there is no access to oxygen. The sulphate-reducing bacteria seem to thrive when the Cl - concentration of the groundwater is 4000-6000 mg/l. Sulphate reduction is an in situ process but the resulting hydrogen-sulphide rich water can be transported to other locations. A more vigorous sulphate reduction takes place when the organic content in the groundwater is high (>10 mg/l DOC) which is the case in the sediments and in the groundwaters under the sea. Some bacteria use hydrogen as an electron donor instead of organic carbon and can therefore live in deep environments where access to organic material is limited. The sulphate-reducing bacteria seem to adapt to changing flow situations caused by the tunnel construction relatively fast. Sulphate reduction seems to have occurred and will probably occur where conditions are favourable for the sulphate-reducing bacteria such as anaerobic brackish groundwater with dissolved sulphate and organic carbon or hydrogen. 59 refs, 37 figs, 6 tabs

  17. Periodic instantons and scattering amplitudes

    International Nuclear Information System (INIS)

    Khlebnikov, S.Yu.; Rubakov, V.A.; Tinyakov, P.G.

    1991-04-01

    We discuss the role of periodic euclidean solutions with two turning points and zero winding number (periodic instantons) in instanton induced processes below the sphaleron energy E sph . We find that the periodic instantons describe certain multiparticle scattering events leading to the transitions between topologically distinct vacua. Both the semiclassical amplitudes and inital and final states of these transitions are determined by the periodic instantons. Furthermore, the corresponding probabilities are maximal among all states of given energy. We show that at E ≤ E sph , the periodic instantons can be approximated by infinite chains of ordinary instantons and anti-instantons, and they naturally emerge as deformations of the zero energy instanton. In the framework of 2d abelian Higgs model and 4d electroweak theory we show, however, that there is not obvious relation between periodic instantons and two-particle scattering amplitudes. (orig.)

  18. Microprocessor controlled digital period meter

    International Nuclear Information System (INIS)

    Keefe, D.J.; McDowell, W.P.; Rusch, G.K.

    1980-01-01

    A microprocessor controlled digital period meter has been developed and tested operationally on a reactor at Argonne National Laboratory. The principle of operation is the mathematical relationship between asymptotic periods and pulse counting circuitry. This relationship is used to calculate and display the reactor periods over a range of /plus or minus/1 second to /plus or minus/999 seconds. The time interval required to update each measurement automatically varies from 8 seconds at the lowest counting rates to 2 seconds at higher counting rates. The paper will describe hardware and software design details and show the advantages of this type of Period Meter over the conventional circuits. 1 ref

  19. Doubly periodic solutions of the modified Kawahara equation

    International Nuclear Information System (INIS)

    Zhang Dan

    2005-01-01

    Some doubly periodic (Jacobi elliptic function) solutions of the modified Kawahara equation are presented in closed form. Our approach is to introduce a new auxiliary ordinary differential equation and use its Jacobi elliptic function solutions to construct doubly periodic solutions of the modified Kawahara equation. When the module m → 1, these solutions degenerate to the exact solitary wave solutions of the equation. Then we reveal the relation of some exact solutions for the modified Kawahara equation obtained by other authors

  20. Recognition method of construction conflict based on driver's eye movement.

    Science.gov (United States)

    Xu, Yi; Li, Shiwu; Gao, Song; Tan, Derong; Guo, Dong; Wang, Yuqiong

    2018-04-01

    Drivers eye movement data in simulated construction conflicts at different speeds were collected and analyzed to find the relationship between the drivers' eye movement and the construction conflict. On the basis of the relationship between the drivers' eye movement and the construction conflict, the peak point of wavelet processed pupil diameter, the first point on the left side of the peak point and the first blink point after the peak point are selected as key points for locating construction conflict periods. On the basis of the key points and the GSA, a construction conflict recognition method so called the CCFRM is proposed. And the construction conflict recognition speed and location accuracy of the CCFRM are verified. The good performance of the CCFRM verified the feasibility of proposed key points in construction conflict recognition. Copyright © 2018 Elsevier Ltd. All rights reserved.