Sample records for construction cost control

  1. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  2. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  3. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  4. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  5. Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    There is mounting evidence that zero energy can, in many cases, be achieved within typical construction budgets. To ensure that the momentum behind zero energy buildings and other low-energy buildings will continue to grow, this guide assembles recommendations for replicating specific successes of early adopters who have met their energy goals while controlling costs. Contents include: discussion of recommended cost control strategies, which are grouped by project phase (acquisition and delivery, design, and construction) and accompanied by industry examples; recommendations for balancing key decision-making factors; and quick reference tables that can help teams apply strategies to specific projects.

  6. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  7. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  8. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  9. Intercalated Injection, Target Model Construction and H 2 Performance of Retrospective Cost Adaptive Control

    Science.gov (United States)

    Rahman, Yousaf

    This dissertation extends retrospective cost adaptive control (RCAC) by devel- oping a novel interpretation of RCAC, wherein the retrospective cost minimization uses intercalated injection between the controller numerator and denominator to fit a specific closed-loop transfer function to a target model. The target model thus incor- porates the modeling information required by RCAC. To demonstrate the effect of the target model on closed-loop performance, RCAC is applied to a collection of problems that demonstrate adaptive pole placement, where the target model is used to place closed-loop poles; adaptive PID control, where RCAC adaptively tunes PID gains; and LQG cost minimization, where the optimality and closed-loop frequency response of RCAC is compared with the performance of discrete-time LQG controllers. Next, RCAC is applied to plants that are difficult to control using fixed gain con- trollers, including an aircraft lateral dynamics model that has an unknown transition from minimum-phase to nonminimum-phase (NMP) dynamics, as well as plants with severely limited achievable gain and delay margin. xvi. Methods are developed to control NMP plants without knowledge of the NMP zero. Specifically, a decentralized feedback-feedforward architecture as well as quasi- FIR controllers are considered, where the FIR controller operates in parallel with an internal model controller in order to follow commands for NMP plants without knowledge of the NMP zeros. Next, the following question is considered: Are all full-order dynamic compen- sators observer-based? It is shown that the only case where a dynamic compensator is not observer-based is the case where n is odd and the closed-loop spectrum has no real eigenvalues. Since this is the case, such controllers are necessarily suboptimal in the sense of LQG. This question is relevant to understanding the closed-loop pole locations arising from full-order RCAC compensators. Finally, retrospective cost model refinement (RCMR

  10. Sequential Construction of Costly Networks

    Energy Technology Data Exchange (ETDEWEB)

    Gutfraind, Alexander [Los Alamos National Laboratory

    2011-01-01

    Natural disasters or attacks often disrupt infrastructure networks requiring a costly recovery. This motivates an optimization problem where the objecitve is to construct the nodes of a graph G(V;E), and the cost of each node is dependent on the number of its neighbors previously constructed, or more generally, any properties of the previously-completed subgraph. In this optimization problem the objective is to find a permutation of the nodes which results in the least construction cost. We prove that in the case where the cost of nodes is a convex function in the number of neighbors, the optimal construction sequence is to start at a single node and move outwards. We also introduce algorithms and heuristics for solving various instances of the problem. Those methods can be applied to help reduce the cost of recovering from disasters as well as to plan the deployment of new network infrastructure.

  11. Monitoring and Controlling Engineering and Construction Management Cost Performance Within the Corps of Engineers

    Science.gov (United States)

    1988-12-01

    COST MANAGEMENT The CMIF approach addresses total costs but does not permit the analysis of indirect costs. We found that indirect costs vary...responsibility USACE/divisions Increasing CMIF Districts/divisions level of by fund type detail G&A, technical indirect, burden Districts by fund type

  12. Monitoring systems and their effectiveness for project cost control in construction

    NARCIS (Netherlands)

    Al-Jibouri, Saad H.S.

    2003-01-01

    This paper reports on a research to investigate the effectiveness of some commonly used monitoring systems, in detecting deviations from the planned cost and performance. The monitoring systems used in this work are: Leading parameter technique Variances method Activity based ratios technique The

  13. 25 CFR 700.467 - Construction costs.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  14. Construction of High-Performance, Low-Cost Photoelectrodes with Controlled Polycrystalline Architectures

    Energy Technology Data Exchange (ETDEWEB)

    Kyoung-Shin Choi

    2013-06-30

    The major goal of our research was to gain the ability in electrochemical synthesis to precisely control compositions and morphologies of various oxide-based polycrystalline photoelectrodes in order to establish the composition-morphology-photoelectrochemical property relationships while discovering highly efficient photoelectrode systems for use in solar energy conversion. Major achievements include: development of porous n-type BiVO{sub 4} photoanode for efficient and stable solar water oxidation; development of p-type CuFeO{sub 2} photocathode for solar hydrogen production; and junction studies on electrochemically fabricated p-n Cu{sub 2}O homojunction solar cells for efficiency enhancement.

  15. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... will not only reduce the stress on estimators but also enhance the accuracy of cost estimates. The resulting 11 ... cost estimating process to work together to ..... construction estimators in Hong. Kong. Construction Management.

  16. Construction Cost Management in Resource Based Economy

    OpenAIRE

    Elazzazy, Muhammad

    2017-01-01

    Resource Based Economy tested according to criteria formulated from the construction cost management best practices. A cost management plan modeled to demonstrate the possibility of construction management under a new socio-economic system, which counts the consumed natural resources by construction as the dry cost to the environment.

  17. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  18. Construction machine control guidance implementation strategy.

    Science.gov (United States)

    2010-07-01

    Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...

  19. CONSTRUCTION COST PREDICTION USING NEURAL NETWORKS

    Directory of Open Access Journals (Sweden)

    Smita K Magdum

    2017-10-01

    Full Text Available Construction cost prediction is important for construction firms to compete and grow in the industry. Accurate construction cost prediction in the early stage of project is important for project feasibility studies and successful completion. There are many factors that affect the cost prediction. This paper presents construction cost prediction as multiple regression model with cost of six materials as independent variables. The objective of this paper is to develop neural networks and multilayer perceptron based model for construction cost prediction. Different models of NN and MLP are developed with varying hidden layer size and hidden nodes. Four artificial neural network models and twelve multilayer perceptron models are compared. MLP and NN give better results than statistical regression method. As compared to NN, MLP works better on training dataset but fails on testing dataset. Five activation functions are tested to identify suitable function for the problem. ‘elu' transfer function gives better results than other transfer function.

  20. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  1. Safety cost management in construction companies: A proposal classification.

    Science.gov (United States)

    López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C

    2016-06-16

    Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.

  2. Reliability and construction control

    Directory of Open Access Journals (Sweden)

    Sherif S. AbdelSalam

    2016-06-01

    Full Text Available The goal of this study was to determine the most reliable and efficient combination of design and construction methods required for vibro piles. For a wide range of static and dynamic formulas, the reliability-based resistance factors were calculated using EGYPT database, which houses load test results for 318 piles. The analysis was extended to introduce a construction control factor that determines the variation between the pile nominal capacities calculated using static versus dynamic formulae. From the major outcomes, the lowest coefficient of variation is associated with Davisson’s criterion, and the resistance factors calculated for the AASHTO method are relatively high compared with other methods. Additionally, the CPT-Nottingham and Schmertmann method provided the most economic design. Recommendations related to a pile construction control factor were also presented, and it was found that utilizing the factor can significantly reduce variations between calculated and actual capacities.

  3. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  4. Construction engineering inspection direct cost survey.

    Science.gov (United States)

    2014-07-01

    The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...

  5. Construction of a low-cost luximeter

    Science.gov (United States)

    Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.

    2016-04-01

    This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.

  6. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  7. Quality control during construction of power plants

    International Nuclear Information System (INIS)

    Hartstern, R.F.

    1982-01-01

    This paper traces the background and examines the necessity for a program to control quality during the construction phase of a power plant. It also attempts to point out considerations for making these programs cost effective

  8. Analysis of nuclear-power construction costs

    International Nuclear Information System (INIS)

    Jansma, G.L.; Borcherding, J.D.

    1988-01-01

    This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures

  9. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  10. Residential construction cost: An Italian survey.

    Science.gov (United States)

    Canesi, Rubina; Marella, Giuliano

    2017-04-01

    This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy). The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  11. Residential construction cost: An Italian survey

    Directory of Open Access Journals (Sweden)

    Rubina Canesi

    2017-04-01

    Full Text Available This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy. The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  12. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  13. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  14. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  15. Construction cost forecast model : model documentation and technical notes.

    Science.gov (United States)

    2013-05-01

    Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...

  16. External risk factors affecting construction costs

    Science.gov (United States)

    Mubarak, Husin, Saiful; Oktaviati, Mutia

    2017-11-01

    Some risk factors can have impacts on the cost, time, and performance. Results of previous studies indicated that the external conditions are among the factors which give effect to the contractor in the completion of the project. The analysis in the study carried out by considering the conditions of the project in the last 15 years in Aceh province, divided into military conflict phase (2000-2004), post tsunami disaster rehabilitation and reconstruction phase (2005-2009), and post-rehabilitation and reconstruction phase (2010-present). This study intended to analyze the impact of external risk factors, primarily related to the impact on project costs and to investigate the influence of the risk factors and construction phases impacted the project cost. Data was collected by using a questionnaire distributed in 15 large companies qualification contractors in Aceh province. Factors analyzed consisted of socio-political, government policies, natural disasters, and monetary conditions. Data were analyzed using statistical application of severity index to measure the level of risk impact. The analysis results presented the tendency of impact on cost can generally be classified as low. There is only one variable classified as high-impact, variable `fuel price increases', which appear on the military conflict and post tsunami disaster rehabilitation and reconstruction periods. The risk impact on costs from the factors and variables classified with high intensity needs a serious attention, especially when the high level impact is followed by the high frequency of occurrences.

  17. Controlling HR Costs.

    Science.gov (United States)

    Ellig, Bruce R.

    1990-01-01

    Controlling human resources costs is critical for a competitive advantage. More money will have to be invested in education and training because of an inadequate, ill-prepared group of entry-level workers. Commitment to employees will have to be considered in relation to the increased investment in them. (JOW)

  18. Construction of cost effective homebuilt spin coater for coating ...

    African Journals Online (AJOL)

    We report the construction of a cost effective and low power consumption spin coater from a direct current (DC) brushless motor. The DC mechanical component is widdely available in the central processing unit (CPU) cooler. This set up permits simple operation where the DC voltage can be controlled manually in order to ...

  19. Quality Control in construction.

    Science.gov (United States)

    1984-01-01

    behavioral scientists. In 1962, Dr. Kaoru Ishikawa gave shape to the form of training which featured intradepartmental groups of ten or so workers seated...and Japanese circles bears closer scrutiny. 4.3.1 Japanese Ingredients of Quality The founder of quality circles, Dr. Kaoru Ishikawa , gives six...around 51 a table; hence the name Quality Control Circle. 4 Dr. 0 Ishikawa was an engineering professor at Tokyo University, and the circles were

  20. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  1. Analysis of Trends in Housing Construction Cost in Nigeria from ...

    African Journals Online (AJOL)

    The upward trends in housing construction costs have been a major issue in the economy as a whole. The research uses typical 3 - bedroom bungalow in Lagos to analyze the trends in housing construction cost from 2000 to 2009. The basic question for this research is whether the inflation in housing construction costs ...

  2. Development of a simple estimation tool for LMFBR construction cost

    International Nuclear Information System (INIS)

    Yoshida, Kazuo; Kinoshita, Izumi

    1999-01-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  3. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    conditions; (4 Inflation; and (5 Fluctuation in prices of raw materials are also responsible. The study concluded with recommending, ensuring adequate and available source of finance, allocating sufficient time and funding the design phase while cost estimators should be aware of the problems, but must not allow to deflect them from their primary tasks, which must always use all data and time available to produce the best possible estimate, improve owner’s project management procedures, material bulk purchase, establishing fraudulent system of individual accountability to discourage stealing and other related vices, adequate planning by breaking project planning into short term achievable goals, medium term planning and long term planning, and through estimation process for projects cost calculations, with vigilant planning, keeping in view trends of inflation and depreciation factors, construction cost variation trends in wastewater projects with lead to smoother implementation and achievement of desired cost control. Also, this paper serves as a guide and reference for contractors and construction managers for more effective management in constructing wastewater projects to achieve a competitive level of quality and a cost effective project.

  4. Controlling nuclear retrofit costs

    International Nuclear Information System (INIS)

    Gruber, C.O.

    1985-01-01

    Increased safety regulations that required modifications to nuclear power plants have had an impact on the capital and expense budgets of utilities. The author addresses the budgeting and control of project-related expenditures, and notes the importance of total cost management throughout the project's life cycle. That total includes the systems, procedures, personnel, expertise, and organization involved in the process. A rational and structured evaluation process at the beginning, realistic targets, and an organizational framework are key components. 2 references, 3 figures, 1 table

  5. Construction Cost Growth for New Department of Energy Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kubic, Jr., William L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-05-25

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

  6. Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.

    Science.gov (United States)

    Bilginsoy, Cihan; Philips, Peter

    2000-01-01

    Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…

  7. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  8. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  9. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  10. Space construction system analysis. Part 2: Cost and programmatics

    Science.gov (United States)

    Vonflue, F. W.; Cooper, W.

    1980-01-01

    Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.

  11. Modern Methods for Cost Management in Construction Enterprises

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2015-06-01

    Full Text Available Cost management should be seen as an essential function of enterprises which perform their activities in current market environment. One of the main factors affecting the level of achieved profit and favourable market position is cost structure. The company's ability to obtain necessary and reliable information on their own cost, subsequent processing and effective cost management is crucial for achieving success. This study focuses on cost management and the use of modern methods of cost management in construction enterprises. The aim of this paper is to identify approaches to cost management in Slovak construction enterprises, based on own empirical research.

  12. Controlling Health Care Costs

    Science.gov (United States)

    Dessoff, Alan

    2009-01-01

    This article examines issues on health care costs and describes measures taken by public districts to reduce spending. As in most companies in America, health plan designs in public districts are being changed to reflect higher out-of-pocket costs, such as higher deductibles on visits to providers, hospital stays, and prescription drugs. District…

  13. Cost-derived indices for building design and construction ...

    African Journals Online (AJOL)

    Also as multiples of gfi, substructure cost index, sci and roofing cost index, rci could predict componental costs of substructure and roofing for phased development purposes. Keywords: Cost Indices, Building Design, Building Construction Journal of Modeling, Design and Management of Engineering Systems, Vol.

  14. 23 CFR 140.907 - Overhead and indirect construction costs.

    Science.gov (United States)

    2010-04-01

    ... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...

  15. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  16. AP1000 construction and operating costs

    Energy Technology Data Exchange (ETDEWEB)

    Winters, J.W.; Corletti, M.M. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Thompson, M

    2001-07-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  17. AP1000 construction and operating costs

    International Nuclear Information System (INIS)

    Winters, J.W.; Corletti, M.M.; Thompson, M.

    2001-01-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  18. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... cost-significant items, 15 priced bills of quantities of high rise office building pro ects executed or awarded in Nigeria between 2002 and 2011 were analysed. The study found that11 (29. %) out of 3 bill items were cost-significant accounting for 2.2% of total value of the work. The implication of the finding is ...

  19. Salt marsh construction costs and shrimp production

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Continuing wetland loss in Galveston Bay, Texas (USA) has led to the development of various salt marsh restoration projects. These constructed wetlands often attempt...

  20. Costs of occupational injuries in construction in the United States.

    Science.gov (United States)

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2007-11-01

    This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.

  1. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthelemy, Michel; Escobar Rangel, Lina

    2013-01-01

    This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer (A- E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. (authors)

  2. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthélemy, Michel; Escobar Rangel, Lina

    2015-01-01

    This paper provides an econometric analysis of nuclear reactor construction costs in France and the United States based on overnight costs data. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using change in expected electricity demand as instrument. We argue that the construction of nuclear reactors can benefit from standardization gains through two channels. First, short term coordination benefits can arise when the diversity of nuclear reactors' designs under construction is low. Second, long term benefits can occur due to learning spillovers from past constructions of similar reactors. We find that construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect–Engineer. In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. -- Highlights: •This paper analyses the determinants of nuclear reactors construction costs and lead-time. •We study short term (coordination gains) and long term (learning by doing) benefits of standardization in France and the US. •Results show that standardization of nuclear programs is a key factor for reducing construction costs. •We also suggest that technological progress has contributed to construction costs escalation

  3. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  4. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  5. Belowground advantages in construction cost facilitate a cryptic plant invasion.

    Science.gov (United States)

    Caplan, Joshua S; Wheaton, Christine N; Mozdzer, Thomas J

    2014-04-30

    The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. Published by Oxford University Press on behalf of the Annals of Botany Company.

  6. Using Technology to Control Costs

    Science.gov (United States)

    Ho, Simon; Schoenberg, Doug; Richards, Dan; Morath, Michael

    2009-01-01

    In this article, the authors examines the use of technology to control costs in the child care industry. One of these technology solutions is Software-as-a-Service (SaaS). SaaS solutions can help child care providers save money in many aspects of center management. In addition to cost savings, SaaS solutions are also particularly appealing to…

  7. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  8. Costs of control

    DEFF Research Database (Denmark)

    Thomalla, Götz; Jonas, Melanie; Bäumer, Tobias

    2014-01-01

    Gilles de la Tourette syndrome is a neuropsychiatric disorder characterized by an impaired ability to inhibit unwanted behaviour. Although the presence of chronic motor and vocal tics defines Tourette's syndrome, other distinctive behavioural features like echo- and coprophenomena, and non...... time until a stimulus instructed them to either execute (Go) or inhibit it (NoGo). Tics were monitored throughout the experiments, combining surface electromyogram, video recording, and clinical assessment in the scanner. Patients with Tourette's syndrome had longer reaction times than healthy controls...

  9. A Semantics-Based Approach to Construction Cost Estimating

    Science.gov (United States)

    Niknam, Mehrdad

    2015-01-01

    A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…

  10. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  11. Quality Cost in the Construction Industry ' Preliminary Findings in Malaysia

    Directory of Open Access Journals (Sweden)

    Mukhtar Che Ali

    2010-06-01

    Full Text Available One of the key areas being emphasis in ISO 9001 Quality Management System (QMS is performance measurement towards continual improvement. Among the primary measuring tools is quality cost approach. Quality cost has been well practice in manufacturing sector but slowly gain its importance in construction industry. In fact Project Management Body of Knowledge (PMBOK has reckoned quality cost as one of the tool and technique in few of its management processes. In view of such circumstances that has prompted an effort to undertake a study to ascertain the level of knowledge and practice on quality cost in Malaysian construction landscape. The targeted group of respondents was the personnel in the project management team. Capitalizing Construction Industry Development Board (CIDB National Electronic Tendering Initiatives (NETI road shows which were held in year 2007 throughout the country, the author was able to garner 263 respondents representing the project management team. Subsequently the data gathered from the completed forms were analyzed using Statistical Package for Social Science (SPSS software. General findings indicated that the level of knowledge and practice on quality cost among the project management team were relatively low. One of the main contributing factors was poor knowledge in the area related to quality cost. Despite of such scenario most of the respondents showed their interest in acquiring knowledge in the field of quality cost. Hence quality cost approach is at the infancy stage in Malaysian construction industry.

  12. An Environmentally Oriented Constructive Cost Model In Information ...

    African Journals Online (AJOL)

    A model was designed to assist software developers in Nigeria to estimate software effort, duration and cost as a result of the difficulties in understanding the parameters of the traditional Constructive Cost Model II (COCOMO II) , which was designed for a specif ic environment, using Source Lines of Code (SLOC) . Results ...

  13. Low-cost satellite mechanical design and construction

    Science.gov (United States)

    Boisjolie-Gair, Nathaniel; Straub, Jeremy

    2017-05-01

    This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.

  14. Evaluation of construction cost of pyro-partitioning plant

    International Nuclear Information System (INIS)

    Kinoshita, Kensuke; Kurata, Masateru; Inoue, Tadashi

    1999-01-01

    This study was conducted to evaluate the construction cost of a pyro-partitioning plant. The plant capacity was chosen to accommodate processing of the HLLW generated by PUREX reprocessing of 800 ton of spent LWR fuel. The block flow diagram and mass balance obtained from our previous experimental data were used to produce a detailed process-flow diagram and to design the plant. In this evaluation, the plant was estimated to cover an area of about 90 m x 70 m, and to cost $576 million for construction. This study shows that the cost of process equipments, such as reaction vessels, accountability tanks and so on, is just about 13% of total construction cost. On the other hand, the cost of process robots and the equipments for key measurement point (KMP) is major part in the cost of in-cell equipment. So it is clear that the construction cost can be reduced by reducing the number of material balance area (MBA) and KMP. (author)

  15. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  16. Construction of VLCC marine oil storage cost index system

    Science.gov (United States)

    Li, Yuan; Li, Yule; Lu, Jinshu; Wu, Wenfeng; Zhu, Faxin; Chen, Tian; Qin, Beichen

    2018-04-01

    VLCC as the research object, the basic knowledge of VLCC is summarized. According to the phenomenon that VLCC is applied to offshore oil storage gradually, this paper applies the theoretical analysis method to analyze the excess capacity from VLCC, the drop of oil price, the aging VLCC is more suitable for offshore storage The paper analyzes the reason of VLCC offshore oil storage from three aspects, analyzes the cost of VLCC offshore storage from the aspects of manpower cost and shipping cost, and constructs the cost index system of VLCC offshore oil storage.

  17. Cost Estimation and Control for Flight Systems

    Science.gov (United States)

    Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)

    2002-01-01

    Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

  18. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  19. Low cost construction technologies and materials - case study Mozambuique

    CSIR Research Space (South Africa)

    Kuchena, JC

    2009-09-01

    Full Text Available Low cost or affordable construction technologies and materials are often touted as a panacea in meeting the ever growing demand for rapid housing delivery in developing economies. Mozambique as with most of the developing world, from both historical...

  20. CANDU 9 - reducing capital costs through advanced construction

    International Nuclear Information System (INIS)

    Hedges, K.; Yu, S.; Hopwood, J.

    1996-01-01

    Reducing costs is a clear priority in nuclear markets where capital reaches billions and financing is hard-won. To address that priority, AECL introduced the use of advanced construction techniques. This has been one of the key thrusts behind its development of CANDU 9. (author)

  1. Space construction base control system

    Science.gov (United States)

    1978-01-01

    Aspects of an attitude control system were studied and developed for a large space base that is structurally flexible and whose mass properties change rather dramatically during its orbital lifetime. Topics of discussion include the following: (1) space base orbital pointing and maneuvering; (2) angular momentum sizing of actuators; (3) momentum desaturation selection and sizing; (4) multilevel control technique applied to configuration one; (5) one-dimensional model simulation; (6) N-body discrete coordinate simulation; (7) structural analysis math model formulation; and (8) discussion of control problems and control methods.

  2. LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting

    CERN Document Server

    Skelton, K

    2000-01-01

    The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

  3. REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Mladen Zelenika

    1998-12-01

    Full Text Available A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in order to justify the investment cost for the acquisition of additional equipment for a single well only. The wells, located in a karst vrtača close to an estavelle near Tomislavgrad, with a diameter of 500 mm and approximately 80 m deep, have been accomplished with a low rate of penetration using the conventional Cable tool and resp. Rotary Drilling Method. In this paper results of analyses for the given circumstances are shown: both the efficiency and cost of the mentioned drilling methods performed by the crews of »Geotehnika d.d.« Zagreb, as well as the justifiability of investments in new equipment are evaluated.

  4. Infection control in design and construction work.

    Science.gov (United States)

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  5. Nuclear reactor control room construction

    International Nuclear Information System (INIS)

    Lamuro, R.C.; Orr, R.

    1993-01-01

    A control room for a nuclear plant is disclosed. In the control room, objects labelled 12, 20, 22, 26, 30 in the drawing are no less than four inches from walls labelled 10.2. A ceiling contains cooling fins that extend downwards toward the floor from metal plates. A concrete slab is poured over the plates. Studs are welded to the plates and are encased in the concrete. 6 figures

  6. Canadian nuclear power plant construction cost forecast and analysis

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequence of the decision as possible. This understanding must be provided by the evaluation of the situation to take place in the future. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A data base is built and indexes are prepared. Based on these indexes an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of forty years are generated and applications of alternative scenario forecasts and range forecasts to uncertainty assessment are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the very first ever done for Canadian NGS constructions

  7. Modeling of Construction Cost of Villas in Oman

    Directory of Open Access Journals (Sweden)

    MA Al-Mohsin

    2014-06-01

    Full Text Available In this research, a model for estimating construction cost of villas is presented. The model takes into account four major factors affecting villa's cost, namely: built up area, number of toilets, number of bedrooms and the number of stories. A field survey was conducted to collect information required for such model using data collection form designed by the researchers. Information about 150 villas was collected from six well experienced consultants in the field of villa design and supervision in Oman. Collected data was analyzed to develop suggested model which consists of two main levels of estimate. The first level is at the conceptual design stage where the client presents his/her need of space and basic information about the available plot for construction. The second level of cost estimation is carried out after the preliminary design stage where the client has to decide on the finishes and type of structure. At the second level of estimation, the client should be able to decide whether to precede for construction or not, according to his/her budget. The model is general and can be used anywhere and was validated for accepted degree of confidence using the actual cost of the 112 executed villa projects in Oman. The villas included in this study were owned by clients from both high and low income brackets and had different types of finishing material. The developed equations showed good correlation between the selected variables and the actual cost with R2  = 0.79 in the case of conceptual estimate and R2  = 0.601 for preliminary estimate.

  8. Controlling Healthcare Costs: Just Cost Effectiveness or "Just" Cost Effectiveness?

    Science.gov (United States)

    Fleck, Leonard M

    2018-04-01

    Meeting healthcare needs is a matter of social justice. Healthcare needs are virtually limitless; however, resources, such as money, for meeting those needs, are limited. How then should we (just and caring citizens and policymakers in such a society) decide which needs must be met as a matter of justice with those limited resources? One reasonable response would be that we should use cost effectiveness as our primary criterion for making those choices. This article argues instead that cost-effectiveness considerations must be constrained by considerations of healthcare justice. The goal of this article will be to provide a preliminary account of how we might distinguish just from unjust or insufficiently just applications of cost-effectiveness analysis to some healthcare rationing problems; specifically, problems related to extraordinarily expensive targeted cancer therapies. Unconstrained compassionate appeals for resources for the medically least well-off cancer patients will be neither just nor cost effective.

  9. Constructed wetlands for pollution control: processes, performance, design and operation

    National Research Council Canada - National Science Library

    2000-01-01

    .... Types of constructed wetland, major design parameters, role of vegetation, hydraulic patterns, loadings, treatment efficiency, construction, operation and maintenance costs are discussed in depth...

  10. Control Strategy Tool (CoST)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The EPA Control Strategy Tool (CoST) is a software tool for projecting potential future control scenarios, their effects on emissions and estimated costs. This tool...

  11. Costs and Cost-Effectiveness of Plasmodium vivax Control.

    Science.gov (United States)

    White, Michael T; Yeung, Shunmay; Patouillard, Edith; Cibulskis, Richard

    2016-12-28

    The continued success of efforts to reduce the global malaria burden will require sustained funding for interventions specifically targeting Plasmodium vivax The optimal use of limited financial resources necessitates cost and cost-effectiveness analyses of strategies for diagnosing and treating P. vivax and vector control tools. Herein, we review the existing published evidence on the costs and cost-effectiveness of interventions for controlling P. vivax, identifying nine studies focused on diagnosis and treatment and seven studies focused on vector control. Although many of the results from the much more extensive P. falciparum literature can be applied to P. vivax, it is not always possible to extrapolate results from P. falciparum-specific cost-effectiveness analyses. Notably, there is a need for additional studies to evaluate the potential cost-effectiveness of radical cure with primaquine for the prevention of P. vivax relapses with glucose-6-phosphate dehydrogenase testing. © The American Society of Tropical Medicine and Hygiene.

  12. Payroll costs not identified by phase in construction work done with no third subcontracted

    Directory of Open Access Journals (Sweden)

    Rubén Antonio González Franco

    2012-05-01

    Full Text Available The Social Insurance Regulations applicable to the construction companies with regard to meeting high work requires the owner to generate high for each construction phase and thus to check the amounts of materials, machinery and equipment, as well as labor applied at the same stage, all in order to validate that it complies 100% with the payment of worker-employer contributions by the employer, guidelines in the specific case of SMEs practice becomes more complex, controls as these companies have no proof phased costs in two areas in particular, as are exercised costs of materials and workmanship for housing, which is why this research aims to solve the problem of generating clear guidelines to comply with the verification of payment of contributions in the field of labor when it is exerciseddirectly, and through the application of direct interviews and questionnaires to the units of analysis consists of businessmen, representatives, directors or business accountants SMEs construction, staff of the National Chamber of construction Industry and the Mexican Social Security Institute head of the Department of construction, who will answer questions the same instrument provides, and with this it was determined that in fact the perception of these SMEs is required to leave a standard criterion for testing and would be more appropriate apportionment of costs proportionately based on hire dates and termination dates of the work keeping track of costs identifying overall, leaving an identification number in the working papers for further review by the authority.

  13. Laboratory cost control and financial management software.

    Science.gov (United States)

    Mayer, M

    1998-02-09

    Economical constraints within the health care system advocate the introduction of tighter control of costs in clinical laboratories. Detailed cost information forms the basis for cost control and financial management. Based on the cost information, proper decisions regarding priorities, procedure choices, personnel policies and investments can be made. This presentation outlines some principles of cost analysis, describes common limitations of cost analysis, and exemplifies use of software to achieve optimized cost control. One commercially available cost analysis software, LabCost, is described in some detail. In addition to provision of cost information, LabCost also serves as a general management tool for resource handling, accounting, inventory management and billing. The application of LabCost in the selection process of a new high throughput analyzer for a large clinical chemistry service is taken as an example for decisions that can be assisted by cost evaluation. It is concluded that laboratory management that wisely utilizes cost analysis to support the decision-making process will undoubtedly have a clear advantage over those laboratories that fail to employ cost considerations to guide their actions.

  14. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    International Nuclear Information System (INIS)

    El-Alaily, T.M.; El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M.; Assar, S.T.

    2015-01-01

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability

  15. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Energy Technology Data Exchange (ETDEWEB)

    El-Alaily, T.M., E-mail: toson_alaily@yahoo.com [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M. [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); Assar, S.T. [Engineering Physics and Mathematics Department, Faculty of Engineering, Tanta University, Tanta (Egypt)

    2015-07-15

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability.

  16. Dutch elm disease control: performance and costs

    Science.gov (United States)

    William N., Jr. Cannon; David P. Worley

    1980-01-01

    Municipal programs to suppress Dutch elm disease have had highly variable results. Performance as measured by tree mortality was unrelated to control strategies. Costs for control programs were 37 to 76 percent less than costs without control programs in the 15-year time-span of the study. Only those municipalities that conducted a high-performance program could be...

  17. Improvement of Cost Calculation in Constructions – Application of the Standard Cost Method

    Directory of Open Access Journals (Sweden)

    Adela Breuer

    2010-12-01

    Full Text Available Grace to the analysis of several commercial companies effectively performed “on the field”, we could remark the necessity to change the method of cost calculation, our motivation being related to the simplification of calculations and the reduction of the labour volume, but especially the necessity to know in due time the deviations occurred as well as the causes having led to their apparition. The importance of knowing the deviations in due time results from the very basic characteristics of the constructions execution, i.e. the performance of works during several budgetary years, which leads to the modifications of prices and materials, the introduction of new technologies, and to the performance of open air activities, making the execution of constructions works be influenced by the atmospheric condition. But the most important aspect of knowing the deviations is the correct determination of expenses and their inscribing in the corresponding period, in view of determining the result of the budgetary year. Our proposal for the enhancement of the method of cost calculation in constructions is the application of the standard cost method in the variant “single standard cost”.

  18. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  19. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  20. Evaluation of ways and procedures to reduce construction cost and increase competition.

    Science.gov (United States)

    2009-01-01

    Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...

  1. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Science.gov (United States)

    El-Alaily, T. M.; El-Nimr, M. K.; Saafan, S. A.; Kamel, M. M.; Meaz, T. M.; Assar, S. T.

    2015-07-01

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability.

  2. Developing methods of controlling quality costs

    OpenAIRE

    Gorbunova A. V.; Maximova O. N.; Ekova V. A.

    2017-01-01

    The article examines issues of managing quality costs, problems of applying economic methods of quality control, implementation of progressive methods of quality costs management in enterprises with the view of improving the efficiency of their evaluation and analysis. With the aim of increasing the effectiveness of the cost management mechanism, authors introduce controlling as a tool of deviation analysis from the standpoint of the process approach. A list of processes and corresponding eva...

  3. Proposal of Effective Quality Control and Insurance System of Construction Industry

    OpenAIRE

    Kawarasaki, Yuta; Nasu, Seigo

    2007-01-01

    In this research, the kinds and the number of defective qualities are examined, and the current state of the defective quality is understood. In addition, a social cost led by analyzing the quality control cost function and the quality insurance cost function in making optimal balance, and requesting a total cost are analyzed. The insurance system that adds the parameter of citizen’s senses of trust at the end leading to an ideal social cost in evaluating the optimal construction management l...

  4. Do randomized controlled trials discuss healthcare costs?

    Directory of Open Access Journals (Sweden)

    G Michael Allan

    Full Text Available BACKGROUND: Healthcare costs, particularly pharmaceutical costs, are a dominant issue for most healthcare organizations, but it is unclear if randomized controlled trials (RCTs routinely discuss costs. Our objective was to assess the frequency and factors associated with the inclusion of costs in RCTs. METHODS AND FINDINGS: We randomly sampled 188 RCTs spanning three years (2003-2005 from six high impact journals. The sample size for RCTs was based on a calculation to estimate the inclusion of actual drug costs with a precision of +/-3%. Two reviewers independently extracted cost data and study characteristics. Frequencies were calculated and potential characteristics associated with the inclusion of costs were explored. Actual drug costs were included in 4.7% (9/188 of RCTs; any actual costs were included in 7.4% (14/188 of RCTs; and any mention of costs was included in 27.7% (52/188 of RCTs. As the amount of industry funding increased across RCTs, from non-profit to mixed to fully industry funded RCTs, there was a statistically significant reduction in the number of RCTs with any actual costs (Cochran-Armitage test, p = 0.005 and any mention of costs (Cochran-Armitage test, p = 0.02. Logistic regression analysis also indicated funding was associated with the inclusion of any actual cost (OR = 0.34, p = 0.009 or any mention of costs (OR = 0.63, p = 0.02. Journal, study conclusions, study location, primary author's country and product age were not associated with inclusion of cost information. CONCLUSION: While physicians are encouraged to consider costs when prescribing drugs for their patients, actual drug costs were provided in only 5% of RCTs and were not mentioned at all in 72% of RCTs. Industry funded trials were less likely to include cost information. No other factors were associated with the inclusion of cost information.

  5. Do randomized controlled trials discuss healthcare costs?

    Science.gov (United States)

    Allan, G Michael; Korownyk, Christina; LaSalle, Kate; Vandermeer, Ben; Ma, Victoria; Klein, Douglas; Manca, Donna

    2010-08-23

    Healthcare costs, particularly pharmaceutical costs, are a dominant issue for most healthcare organizations, but it is unclear if randomized controlled trials (RCTs) routinely discuss costs. Our objective was to assess the frequency and factors associated with the inclusion of costs in RCTs. We randomly sampled 188 RCTs spanning three years (2003-2005) from six high impact journals. The sample size for RCTs was based on a calculation to estimate the inclusion of actual drug costs with a precision of +/-3%. Two reviewers independently extracted cost data and study characteristics. Frequencies were calculated and potential characteristics associated with the inclusion of costs were explored. Actual drug costs were included in 4.7% (9/188) of RCTs; any actual costs were included in 7.4% (14/188) of RCTs; and any mention of costs was included in 27.7% (52/188) of RCTs. As the amount of industry funding increased across RCTs, from non-profit to mixed to fully industry funded RCTs, there was a statistically significant reduction in the number of RCTs with any actual costs (Cochran-Armitage test, p = 0.005) and any mention of costs (Cochran-Armitage test, p = 0.02). Logistic regression analysis also indicated funding was associated with the inclusion of any actual cost (OR = 0.34, p = 0.009) or any mention of costs (OR = 0.63, p = 0.02). Journal, study conclusions, study location, primary author's country and product age were not associated with inclusion of cost information. While physicians are encouraged to consider costs when prescribing drugs for their patients, actual drug costs were provided in only 5% of RCTs and were not mentioned at all in 72% of RCTs. Industry funded trials were less likely to include cost information. No other factors were associated with the inclusion of cost information.

  6. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  7. E-COCOMO: The Extended COst Constructive MOdel for Cleanroom Software Engineering

    Directory of Open Access Journals (Sweden)

    Hitesh KUMAR SHARMA

    2014-02-01

    Full Text Available Mistakes create rework. Rework takes time and increases costs. The traditional software engineering methodology defines the ratio of Design:Code:Test as 40:20:40. As we can easily see that 40% time and efforts are used in testing phase in traditional approach, that means we have to perform rework again if we found some bugs in testing phase. This rework is being performed after Design and code phase. This rework will increase the cost exponentially. The cleanroom software engineering methodology controls the exponential growth in cost by removing this rework. It says that "do the work correct in first attempt and move to next phase after getting the proof of correctness". This new approach minimized the rework and reduces the cost in the exponential ratio. Due to the removal of testing phase, the COCOMO (COst COnstructive MOdel used for the traditional engineering is not directly applicable in cleanroom software engineering. The traditional cost drivers used for traditional COCOMO needs to be revised. We have proposed the Extended version of COCOMO (i.e. E-COCOMO in which we have incorporated some new cost drivers. This paper explains the proposed E-COCOMO and the detailed description of proposed new cost driver.

  8. Chaos concepts, control and constructive use

    CERN Document Server

    Bolotin, Yurii; Yanovsky, Vladimir

    2017-01-01

    This book offers a short and concise introduction to the many facets of chaos theory. While the study of chaotic behavior in nonlinear, dynamical systems is a well-established research field with ramifications in all areas of science, there is a lot to be learnt about how chaos can be controlled and, under appropriate conditions, can actually be constructive in the sense of becoming a control parameter for the system under investigation, stochastic resonance being a prime example. The present work stresses the latter aspects and, after recalling the paradigm changes introduced by the concept of chaos, leads the reader skillfully through the basics of chaos control by detailing the relevant algorithms for both Hamiltonian and dissipative systems, among others. The main part of the book is then devoted to the issue of synchronization in chaotic systems, an introduction to stochastic resonance, and a survey of ratchet models. In this second, revised and enlarged edition, two more chapters explore the many interf...

  9. Chaos Concepts, Control and Constructive Use

    CERN Document Server

    Bolotin, Yurii; Yanovsky, Vladimir

    2009-01-01

    The study of chaotic behaviour in nonlinear, dynamical systems is now a well established research domain with ramifications into all fields of sciences, spanning a vast range of applications, from celestial mechanics, via climate change, to the functioning of brownian motors in cells. A more recent discovery is that chaos can be controlled and, under appropriate conditions, can actually be constructive in the sense of becoming a control parameter itself for the system under investigation, stochastic resonance being a prime example. The present work is putting emphasis on the latter aspects, and after recalling the paradigm changes introduced by the concept of chaos, leads the reader skillfully through the basics of chaos control by detailing relevant algorithms for both Hamiltonian and dissipative systems amongst others. The main part of the book is then devoted to the issue of synchronization in chaotic systems, an introduction to stochastic resonance and a survey of ratchet models. This short and concise pr...

  10. Design and construction of a low cost solar simulator

    International Nuclear Information System (INIS)

    Supranto; Daud, W.R.W.; Sopian, K.; Othman, M.Y.; Yatim, B.

    2000-01-01

    A solar simulator has been designed and constructed for indoor testing for solar collectors. The simulator consists of 45 halogen lamps. Each lamp has a rated power of a 300 watts. The lamps in ten rows where each row consists of 4 to 5 lamps. The lamps occupied area 6 m 2 . Dimmers are used to control the amount of lamp intensities. The spacing between the lamps and the collector is about 150 cm. The intensities of the lamps are measured using a pyranometer. The intensity contours or mappings for minimum and maximum average pyranometer readings about 280 to 640 W/m 2 are produced, with errors are about of 3.16 % to 4.5 %. (Author)

  11. Information provision of costs controlling

    OpenAIRE

    Ostapenko Tetyana M.

    2013-01-01

    The article studies various views on the controlling notion, its informational function and goal. Based on the approaches to understanding controlling that exist among scientists, the article presents the author's understanding of it as a system that ensures co-ordination of information subsystems, transforms information into the one that is useful for making decisions, ensures information support of management; system, which focuses on optimal use of information as a resource. The article fo...

  12. 19 CFR 351.407 - Calculation of constructed value and cost of production.

    Science.gov (United States)

    2010-04-01

    ... ANTIDUMPING AND COUNTERVAILING DUTIES Calculation of Export Price, Constructed Export Price, Fair Value, and Normal Value § 351.407 Calculation of constructed value and cost of production. (a) Introduction. This... 19 Customs Duties 3 2010-04-01 2010-04-01 false Calculation of constructed value and cost of...

  13. Potential cost savings with terrestrial rabies control

    Directory of Open Access Journals (Sweden)

    Cherry Bryan

    2007-04-01

    Full Text Available Abstract Background The cost-benefit of raccoon rabies control strategies such as oral rabies vaccination (ORV are under evaluation. As an initial quantification of the potential cost savings for a control program, the collection of selected rabies cost data was pilot tested for five counties in New York State (NYS in a three-year period. Methods Rabies costs reported to NYS from the study counties were computerized and linked to a human rabies exposure database. Consolidated costs by county and year were averaged and compared. Results Reported rabies-associated costs for all rabies variants totalled $2.1 million, for human rabies postexposure prophylaxes (PEP (90.9%, animal specimen preparation/shipment to laboratory (4.7%, and pet vaccination clinics (4.4%. The proportion that may be attributed to raccoon rabies control was 37% ($784,529. Average costs associated with the raccoon variant varied across counties from $440 to $1,885 per PEP, $14 to $44 per specimen, and $0.33 to $15 per pet vaccinated. Conclusion Rabies costs vary widely by county in New York State, and were associated with human population size and methods used by counties to estimate costs. Rabies cost variability must be considered in developing estimates of possible ORV-related cost savings. Costs of PEPs and specimen preparation/shipments, as well as the costs of pet vaccination provided by this study may be valuable for development of more realistic scenarios in economic modelling of ORV costs versus benefits.

  14. Management of construction cost contingency covering upside and downside risks

    Directory of Open Access Journals (Sweden)

    Ibrahim Adel Eldosouky

    2014-12-01

    Full Text Available Many contractors are of the opinion that adding contingency funds to the tender price of a project may lead to loss of the tender. This research is a trial to put an end to this incorrect opinion. A more mature attitude to risk would recognize that contingency exists to be spent in order to avoid or minimize threats and to exploit or maximize opportunities. This research proposes an approach for determination and monitoring of Cost Contingency Reserve (CCR for a project. Control of CCR is interfaced with Earned Value Management. Application to a real project is carried out. Post-mitigation simulations show that value of CCR is 2.88% of project cost but there is a potential saving due to opportunities. The project is monitored after eight months from its assumed start date with one assumed emergent risk. The final results are as follows: CCR is enough to cover project current and residual threats and the contractor has a considerable amount of money that will be transferred to his margin at project closure assuming the project will not be exposed to additional emergent risks. A contractor can balance project upside risks and its downsides to increase his chance to win tender of the project.

  15. Rate-cost tradeoffs in control

    KAUST Repository

    Kostina, Victoria

    2017-02-13

    Consider a distributed control problem with a communication channel connecting the observer of a linear stochastic system to the controller. The goal of the controller is minimize a quadratic cost function. The most basic special case of that cost function is the mean-square deviation of the system state from the desired state. We study the fundamental tradeoff between the communication rate r bits/sec and the limsup of the expected cost b, and show a lower bound on the rate necessary to attain b. The bound applies as long as the system noise has a probability density function. If target cost b is not too large, that bound can be closely approached by a simple lattice quantization scheme that only quantizes the innovation, that is, the difference between the controller\\'s belief about the current state and the true state.

  16. Design of turbidity controls for Oklahoma highway construction.

    Science.gov (United States)

    2013-03-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction : industry to control the discharge of pollutants from the sites. The construction effluent guidelines or : ELGs require construction sites to reduce the p...

  17. Theoretical framework of the causes of construction time and cost overruns

    Science.gov (United States)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  18. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    Directory of Open Access Journals (Sweden)

    Iakymchuk Iryna M.

    2017-09-01

    Full Text Available The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiveness of innovation project by providing cost-management services at all stages of investment project, identifying opportunities for reducing them, thereby contributing to sustainable development of construction organization over time. It has been concluded that the more specific the program of activities of construction organization, the more accurate the process of identification of costs becomes, the more efficient is the management of costs, targeted at saving resources, reducing the self cost of construction works.

  19. Application research of cost construction on radioactive waste management

    International Nuclear Information System (INIS)

    Gao Yanfeng; Bi Sheng; Liu Zhenhe

    2009-01-01

    This paper summarizes the theoretical basis systems for the cost component on radioactive waste management. Through the decomposition production of various types of project content, analysis of the cost elements of operating activities, study subjects at reason-able cost and expense. On the basis of the formation of radioactive waste management costs of the various operating structure Into, and established a comprehensive system of price system. (authors)

  20. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  1. User costs as one of main advantages of precast concrete application in highway construction

    Science.gov (United States)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  2. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  3. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  4. Switching Fuzzy Guaranteed Cost Control for Nonlinear Networked Control Systems

    Directory of Open Access Journals (Sweden)

    Linqin Cai

    2014-01-01

    Full Text Available This paper deals with the problem of guaranteed cost control for a class of nonlinear networked control systems (NCSs with time-varying delay. A guaranteed cost controller design method is proposed to achieve the desired control performance based on the switched T-S fuzzy model. The switching mechanism is introduced to handle the uncertainties of NCSs. Based on Lyapunov functional approach, some sufficient conditions for the existence of state feedback robust guaranteed cost controller are presented. Simulation results show that the proposed method is effective to guarantee system’s global asymptotic stability and quality of service (QoS.

  5. An evaluation of waste control measures in construction industry in ...

    African Journals Online (AJOL)

    UFUOMA

    Key words: Construction processes, waste, factors, effects, control measures. INTRODUCTION ... of construction projects, an optimum material control on site should be .... on site due to mishandling or careless delivery accounted for 20% of.

  6. Environmental control costs for oil shale processes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    The studies reported herein are intended to provide more certainty regarding estimates of the costs of controlling environmental residuals from oil shale technologies being readied for commercial application. The need for this study was evident from earlier work conducted by the Office of Environment for the Department of Energy Oil Shale Commercialization Planning, Environmental Readiness Assessment in mid-1978. At that time there was little reliable information on the costs for controlling residuals and for safe handling of wastes from oil shale processes. The uncertainties in estimating costs of complying with yet-to-be-defined environmental standards and regulations for oil shale facilities are a critical element that will affect the decision on proceeding with shale oil production. Until the regulatory requirements are fully clarified and processes and controls are investigated and tested in units of larger size, it will not be possible to provide definitive answers to the cost question. Thus, the objective of this work was to establish ranges of possible control costs per barrel of shale oil produced, reflecting various regulatory, technical, and financing assumptions. Two separate reports make up the bulk of this document. One report, prepared by the Denver Research Institute, is a relatively rigorous engineering treatment of the subject, based on regulatory assumptions and technical judgements as to best available control technologies and practices. The other report examines the incremental cost effect of more conservative technical and financing alternatives. An overview section is included that synthesizes the products of the separate studies and addresses two variations to the assumptions.

  7. Modeling of Control Costs, Emissions, and Control Retrofits for Cost Effectiveness and Feasibility Analyses

    Science.gov (United States)

    Learn about EPA’s use of the Integrated Planning Model (IPM) to develop estimates of SO2 and NOx emission control costs, projections of futureemissions, and projections of capacity of future control retrofits, assuming controls on EGUs.

  8. Developing methods of controlling quality costs

    Directory of Open Access Journals (Sweden)

    Gorbunova A. V.

    2017-01-01

    Full Text Available The article examines issues of managing quality costs, problems of applying economic methods of quality control, implementation of progressive methods of quality costs management in enterprises with the view of improving the efficiency of their evaluation and analysis. With the aim of increasing the effectiveness of the cost management mechanism, authors introduce controlling as a tool of deviation analysis from the standpoint of the process approach. A list of processes and corresponding evaluation criteria in the quality management system of enterprises is introduced. Authors also introduce the method of controlling quality costs and propose it for the practical application, which allows them to determine useful and unnecessary costs at the existing operating plant. Implementing the proposed recommendations in the system of cost management at an enterprise will allow to improve productivity of processes operating and reduce wasted expense on the quality of the process on the basis of determining values of useful and useless costs of quality according to criteria of processes functioning in the system of quality management.

  9. Assessment of Cost Variation in Solid and Hollow Floor Construction in Lagos State

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2013-12-01

    Full Text Available The differences in construction methods between different forms of slabs construction tend to result into variation in the cost of the slabs for any building project. Thus, this study aims at assessing the variation in construction cost among various construction methods available for hollow and solid floors in construction projects within Lagos State. The research design for this study was a survey design approach and the population of the study are active professionals (Architects, Civil Engineers, Builders, Quantity Surveyors, Consultant and contractors because they are the major participants in the construction activities of the construction industry in Lagos State, Nigeria. The research is based on 46 returned questionnaires out of the 60 that was administered. The data from the questionnaires were analyzed using descriptive tools such as frequencies, percentage and mean values. The hypotheses were tested with paired sample t-test and it was found that the system or method of slab construction well known to the respondents is cast in situ, precast and semi-precast. The study also shows that the cost of in-situ solid slabs are higher than that of hollow slab which is an indication that solid slab construction is more expensive than hollow slab construction provided the hollow slab is a one-way hollow floor and not waffle floor. In pre cast solid slab construction the cost of transportation of units to sites, cost of expertise required in the construction process and the cost of fabrication off site are the three highest and most expensive aspects of precast solid slab while cost of erection and placement and the cost of grouting and topping if required are less expensive. Therefore there is difference in the cost of construction between the solid and hollow slabs but the difference is not appreciable. The study's major recommendation is that, adequate and careful analysis must be done in the choice of floor system being adopted for any

  10. Computation of piecewise affine terminal cost functions for model predictive control

    NARCIS (Netherlands)

    Brunner, F.D.; Lazar, M.; Allgöwer, F.; Fränzle, Martin; Lygeros, John

    2014-01-01

    This paper proposes a method for the construction of piecewise affine terminal cost functions for model predictive control (MPC). The terminal cost function is constructed on a predefined partition by solving a linear program for a given piecewise affine system, a stabilizing piecewise affine

  11. Configurations of Control: A Transaction Cost Approach

    NARCIS (Netherlands)

    R.F. Speklé (Roland)

    2003-01-01

    textabstractIn this paper, I present a theory of management control based on Transaction Cost Economics. This theory seeks to integrate into a single framework a set of insights as to the nature of the organization's activities, the control problems that are inherent in these activities, and the

  12. Cost Indexing and Unit Price Adjustments for Construction Materials

    Science.gov (United States)

    2012-10-30

    This project was focused on the assimilation of information regarding unit price adjustment clauses, or PACs, : that are offered for construction materials at the state Departments of Transportation (DOTs). It is intended to : provide the South Carol...

  13. The Causes and Costs of Modifications to Military Construction Contracts.

    Science.gov (United States)

    1986-06-06

    issue of contract modifications in federal construction. The first was written by Henry J. Turowski at the Naval Postgraduate 3chool in Monterrey and...Postgraduate School, Monterrey , December 1980). 12. Henry J. Rowland, "The Causes and Effects of Change Orders on the Construction Process", (Master’s thesis...The creation of a separate review cell does not imply completely divorcing review from design. These functions are closely intertwined. The review

  14. Cost of malaria control in Sri Lanka

    DEFF Research Database (Denmark)

    Konradsen, F; Steele, P; Perera, D

    1999-01-01

    The study provides estimates of the cost of various malaria control measures in an area of North-Central Province of Sri Lanka where the disease is endemic. We assumed that each measure was equally effective. In these terms, impregnating privately purchased bednets with insecticide was estimated...... to cost Rs 48 (US(40.87) per individual protected per year, less than half the cost of spraying houses with residual insecticides. Larviciding of vector breeding sites and especially the elimination of breeding habitats by flushing streams through seasonal release of water from upstream reservoirs...

  15. Fast-track, low-cost construction starts with the owner

    International Nuclear Information System (INIS)

    Smock, R.

    1992-01-01

    As we approach the threshold of a new round of ordering of base load generating capacity after a 15-year hiatus, power pant owners are taking a long, hard look at construction. The last round of base load construction was plagued with construction cost overruns and delays. Billions of dollars in cost overruns, many attributable to construction delays, were not allowed to be placed in utilities' rate bases. Those problems will not be tolerated in the next round. During the past few years the construction climate has changed. Non-utility power producers have demonstrated and ability to build small power plants-including many steam plants burning solid fuels-quickly and at surprisingly low costs. In this paper the cost-plus approach traditionally taken by more utilities, who will lead in the base-load construction phase, is being seriously questioned

  16. Effect of construction time, interest rate, and inflation on the capital cost of nuclear power plants

    International Nuclear Information System (INIS)

    Abel, P.S.; Greybeck, E.M.; Omberg, R.P.

    1981-09-01

    Cost estimates for nuclear power plants currently under construction are on the order of four billion dollars. It will be shown, in this paper, that this is a direct consequence of relatively high inflation rates and relatively long construction times. If either inflation rates or construction times, or a combination thereof, should decrease significantly, cost estimates for nuclear power plants could return to approximately two billion dollars

  17. CONSTRUCTION OF A DIFFERENTIAL ISOTHERMAL CALORIMETER OF HIGH SENSITIVITY AND LOW COST.

    OpenAIRE

    Trinca, RB; Perles, CE; Volpe, PLO

    2009-01-01

    CONSTRUCTION OF A DIFFERENTIAL ISOTHERMAL CALORIMETER OF HIGH SENSITIVITY AND LOW COST The high cost of sensitivity commercial calorimeters may represent an obstacle for many calorimetric research groups. This work describes (fie construction and calibration of a batch differential heat conduction calorimeter with sample cells volumes of about 400 mu L. The calorimeter was built using two small high sensibility square Peltier thermoelectric sensors and the total cost was estimated to be about...

  18. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    OpenAIRE

    Iakymchuk Iryna M.

    2017-01-01

    The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiv...

  19. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  20. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  1. Construction Progress Control (CPC) application for smartphones

    OpenAIRE

    Garcia Garcia, Jordi Carles

    2011-01-01

    Construction inspectors usually use notebooks or laptops to take notes on the construction site about how the tasks are progressing and any other relevant information. Later, when they are in the office they format this information and send it to the scheduler. This way of working wastes time and resources and could be optimized with a new technology already on the market: smartphones.

  2. Alternative ceramic circuit constructions for low cost, high reliability applications

    International Nuclear Information System (INIS)

    Modes, Ch.; O'Neil, M.

    1997-01-01

    The growth in the use of hybrid circuit technology has recently been challenged by recent advances in low cost laminate technology, as well as the continued integration of functions into IC's. Size reduction of hybrid 'packages' has turned out to be a means to extend the useful life of this technology. The suppliers of thick film materials technology have responded to this challenge by developing a number of technology options to reduce circuit size, increase density, and reduce overall cost, while maintaining or increasing reliability. This paper provides an overview of the processes that have been developed, and, in many cases are used widely to produce low cost, reliable microcircuits. Comparisons of each of these circuit fabrication processes are made with a discussion of advantages and disadvantages of each technology. (author)

  3. Design and construction of a low cost 50-watt capacity ...

    African Journals Online (AJOL)

    This paper describes the design and construction of a stand-by mode 50-Watt Uninterruptible Power Supply (UPS) as an alternative power supply for electrical and electronic appliances from local materials. The development of this UPS system (a system consisting of battery source, inverter, and switching unit) is to provide ...

  4. A comparative analysis of methods to represent uncertainty in estimating the cost of constructing wastewater treatment plants.

    Science.gov (United States)

    Chen, Ho-Wen; Chang, Ni-Bin

    2002-08-01

    Prediction of construction cost of wastewater treatment facilities could be influential for the economic feasibility of various levels of water pollution control programs. However, construction cost estimation is difficult to precisely evaluate in an uncertain environment and measured quantities are always burdened with different types of cost structures. Therefore, an understanding of the previous development of wastewater treatment plants and of the related construction cost structures of those facilities becomes essential for dealing with an effective regional water pollution control program. But deviations between the observed values and the estimated values are supposed to be due to measurement errors only in the conventional regression models. The inherent uncertainties of the underlying cost structure, where the human estimation is influential, are rarely explored. This paper is designed to recast a well-known problem of construction cost estimation for both domestic and industrial wastewater treatment plants via a comparative framework. Comparisons were made for three technologies of regression analyses, including the conventional least squares regression method, the fuzzy linear regression method, and the newly derived fuzzy goal regression method. The case study, incorporating a complete database with 48 domestic wastewater treatment plants and 29 industrial wastewater treatment plants being collected in Taiwan, implements such a cost estimation procedure in an uncertain environment. Given that the fuzzy structure in regression estimation may account for the inherent human complexity in cost estimation, the fuzzy goal regression method does exhibit more robust results in terms of some criteria. Moderate economy of scale exists in constructing both the domestic and industrial wastewater treatment plants. Findings indicate that the optimal size of a domestic wastewater treatment plant is approximately equivalent to 15,000 m3/day (CMD) and higher in Taiwan

  5. Cost effective material control and accountability training

    International Nuclear Information System (INIS)

    Robichaux, J.J.; Shull, L.M.; Salizzoni, L.M.

    1995-01-01

    DOE Order 5630.15, ''Safeguards and Security Training Program'' is being implemented at the Savannah River Site within the Westinghouse Savannah River Company's material control and accountability program. This paper reviews the development of a material control and accountability task analysis, the development of specific material control and accountability courses, and the cost effective and innovative strategies employed to implement the training program. The paper also discusses how the site material control and accountability policies and procedures are incorporated into the Westinghouse Savannah River Company training program to ensure that personnel receive the most current information

  6. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  7. Construction control of cable-stayed bridges

    OpenAIRE

    Lozano Galant, José Antonio

    2013-01-01

    Premi extraordinari doctorat curs 2012-2013, àmbit d’Enginyeria Civil This work presents a study of the simulation of cable-stayed bridges built on temporary supports focused on their response during construction and in service. To simulate the behavior during construction, a set of four different algorithms has been developed to deal with initial design (Backward Algorithm), updating the tensioning process when deviations on site are measured (Forward Algorithm), optimization processes (D...

  8. Investigating outfitting density as a cost driver in submarine construction

    OpenAIRE

    Terwilliger, Katherine M.

    2015-01-01

    Approved for public release; distribution is unlimited Through the Naval Surface Warfare Center (NSWC), the National Shipbuilding Research Program (NSRP) completed a study in 1992 where the NSRP identified the top-level parameters that have an effect on the cost of naval shipbuilding. These parameters, identified in the study Evaluating the Producibility of Ship Design Alternatives, are arrangements, simplicity, material, standardization and fabrication requirements. Since 2011, the Budget...

  9. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  10. A cost summary applicable to seismic construction and maintenance of nuclear safety related piping

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-01-01

    This paper presents a summary of costs applicable to nuclear power plant piping for an earthquake defined as 0.2 SSE-PGA as a function of three eras of initial construction: 1967--1974, 1974--1981 and 1981--1990. Costs have been presented for both new construction and maintenance in operating plants using both the original PSAR-FSAR design criteria and current SRP requirements. It is recommended that the cost information contained in this report be considered in evaluating the cost benefit relationships associated with current and proposed future changes in seismic design procedures applicable to safety-related piping systems

  11. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  12. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  13. Cost Consideration and a Possible Construction Timeline of the CEPC-SPPC

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Weiren [Fermilab

    2015-04-01

    This paper discusses the cost consideration and a possible construction timeline of the CEPC-SPPC study based on a preliminary conceptual design that is being carried out at the Institute of High Energy Physics (IHEP) in China.

  14. On information and communication technology and production cost in construction industry: evidence from the Netherlands

    NARCIS (Netherlands)

    van der Vlist, A.J; Vrolijk, M.H.; Dewulf, Geert P.M.R.

    2014-01-01

    The interplay between information and communication technology (ICT) and the competitiveness of construction firms is considered. More specifically, the question is whether firms that invest in information and communication technology have a production cost advantage. The economics literature

  15. Designing to target cost: one approach to design/construction integration

    DEFF Research Database (Denmark)

    Jørgensen, Bo

    2005-01-01

    One approach to a more integrated construction delivery process is the concept of ‘designing to target cost’ of which the first examples of application within a lean construction framework have recently been seen. This paper introduces the main principles of the design to target cost method...... and discusses the applicability of this approach to construction. The low degree of organizational and technical continuity from one construction project to the next limits the applicability of the design for target cost approach when compared to its origin in product development of mass manufactured artefacts....... It can be argued that design to target cost may also provide a frame for developing the supply chain towards better coordination and collaboration. Thus methods of design to target cost may serve to facilitate the development of a more integrated supply chain....

  16. A low cost, microprocessor-based battery charge controller

    Energy Technology Data Exchange (ETDEWEB)

    Pulfrey, D L; Hacker, J [Pulfrey Solar Inc., Vancouver, BC (Canada)

    1990-01-01

    This report describes the design, construction, testing, and evaluation of a microprocessor-based battery charge controller that uses charge integration as the method of battery state-of-charge estimation. The controller is intended for use in medium-size (100-1000W) photovoltaic systems that employ 12V lead-acid batteries for charge storage. The controller regulates the charge flow to the battery and operates in three, automatically-determined modes, namely: charge, equalize, and float. The prototype controller is modular in nature and can handle charge/discharge currents of magnitude up to 80A, depending on the number of circuit boards employed. Evaluation tests and field trials have shown the controller to be very accurate and reliable. Based on the cost of the prototype, it appears that an original equipment manufacturer's selling price of $400 for a 40A (500W) unit may be realistic. 18 figs., 2 tabs.

  17. ANN Based Approach for Estimation of Construction Costs of Sports Fields

    Directory of Open Access Journals (Sweden)

    Michał Juszczyk

    2018-01-01

    Full Text Available Cost estimates are essential for the success of construction projects. Neural networks, as the tools of artificial intelligence, offer a significant potential in this field. Applying neural networks, however, requires respective studies due to the specifics of different kinds of facilities. This paper presents the proposal of an approach to the estimation of construction costs of sports fields which is based on neural networks. The general applicability of artificial neural networks in the formulated problem with cost estimation is investigated. An applicability of multilayer perceptron networks is confirmed by the results of the initial training of a set of various artificial neural networks. Moreover, one network was tailored for mapping a relationship between the total cost of construction works and the selected cost predictors which are characteristic of sports fields. Its prediction quality and accuracy were assessed positively. The research results legitimatize the proposed approach.

  18. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  19. Model of investment appraisal of high-rise construction with account of cost of land resources

    Science.gov (United States)

    Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya

    2018-03-01

    The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.

  20. Design, construction and testing of a low-cost flat plate solar energy ...

    African Journals Online (AJOL)

    A low-cost flat plate solar energy collector has been designed and constructed with locally available materials such as mild steel and black paint of absorptance 0.94. On testing, an average daily efficiency of 55.6% was obtained. The methods are simple and illustrate the fact that construction of efficient collectors are ...

  1. Guaranteed Cost Finite-Time Control of Fractional-Order Positive Switched Systems

    Directory of Open Access Journals (Sweden)

    Leipo Liu

    2017-01-01

    Full Text Available The problem of guaranteed cost finite-time control of fractional-order positive switched systems (FOPSS is considered in this paper. Firstly, a new cost function is defined. Then, by constructing linear copositive Lyapunov functions and using the average dwell time (ADT approach, a state feedback controller and a static output feedback controller are constructed, respectively, and sufficient conditions are derived to guarantee that the corresponding closed-loop systems are guaranteed cost finite-time stable (GCFTS. Such conditions can be easily solved by linear programming. Finally, two examples are given to illustrate the effectiveness of the proposed method.

  2. Investor's experience with keeping fixed costs during the construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Cecil, P.

    1990-01-01

    The introduction of fixed costs in the construction of the Temelin nuclear power plant should secure stabilization of budget cost and prevent its increase. The differences between the fixed costs method and the procedure used so far are briefly described. The introduction of fixed costs was to be followed by the corresponding legal regulations; however, the legal adjustment has not been carried out in the desired completeness. The reason is the difference in understanding the notion of fixed costs by the investor, the contractor and the designer. Another problem is the difference in the level and the detail of the initial project design and of the Soviet implementation designs. The investor believes that the introduction of fixed costs has not yet met with the desired response by organizations participating in the construction. (J.P.)

  3. How to control water supply costs

    Energy Technology Data Exchange (ETDEWEB)

    Hornby, D M

    1965-05-17

    Exploring for water can be as expensive as exploring for oil, a factor which is likely to become increasingly clear. Basic essentials of any water-supply study require an understanding and knowledge of the limiting conditions of quality, quantity, cost, and reliability. A logical 10-step program is outlined. The initial steps are as follows: (1) analyze the acutal water demand for flood requirements; (2) select the logical and apparent sources of supply; (3) collect and assess all availabe pertinent information; and (4) formulate a plan of analysis and attack for the study. The intermediate steps are as follows: (5) use this plan in making field and office investigations: (6) having determined the alternatives and preliminary costs, prepare a written assessment; and (7) using the brain-storming technique within the company or unit, utilize the assessment to devise a master action plan and budget for anticipated expenditures. The final steps are as follows: (8) complete other required investigations based upon the master plan and budget; (9) prepare detailed design, specifications and estimates; and (10) call tenders or negotiate the most favorable arrangements with respect to construction time and price.

  4. Non-destructive control in nuclear construction

    International Nuclear Information System (INIS)

    Banus; Barbier; Launay

    1978-01-01

    Having recalled the characteristics of the fundamental components of the main primary circuit of nuclear boilers (900 MW) and the means appropriated for their control, it is recalled that the 'French Electricity Board's specifications and control rules' often prescribe more severe criteria than those existing in the U.S.A. Then practical examples of non-destructive controls concerning the steam generator end plates, vessel stainless steel linings, pump attachements, steam generator pipes are given [fr

  5. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  6. Low cost highly available digital control computer

    International Nuclear Information System (INIS)

    Silvers, M.W.

    1986-01-01

    When designing digital controllers for critical plant control it is important to provide several features. Among these are reliability, availability, maintainability, environmental protection, and low cost. An examination of several applications has lead to a design that can be produced for approximately $20,000 (1000 control points). This design is compatible with modern concepts in distributed and hierarchical control. The canonical controller element is a dual-redundant self-checking computer that communicates with a cross-strapped, electrically isolated input/output system. The input/output subsystem comprises multiple intelligent input/output cards. These cards accept commands from the primary processor which are validated, executed, and acknowledged. Each card may be hot replaced to facilitate sparing. The implementation of the dual-redundant computer architecture is discussed. Called the FS-86, this computer can be used for a variety of applications. It has most recently found application in the upgrade of San Francisco's Bay Area Rapid Transit (BART) train control currently in progress and has been proposed for feedwater control in a boiling water reactor

  7. The system of account and control of logistics costs

    Directory of Open Access Journals (Sweden)

    Khayrullin Rustam Zinnatullovich

    Full Text Available The process of organization of civil engineering provides the delivery of construction materials, equipment to the civil engineering objects in the required quantities at the specified time. Effective tool for solving this problem is logistics. The basic components of logistics costs, which occupy the largest share in the sum of all logistics costs, are transportation costs and storage costs. The civil engineering industry is very promising for the use of outsourcing. The main part of works on providing material and technical resources in most cases is transferred to the outsourcing of other companies, including the group of companies forming the holding. In large holding companies the chain of movement of materials, goods and productions: purchase of materials and goods, completion materials, production structures, storage, movement, transportation, etc. may include several companies belonging in holding. The goods can be moved from one warehouse to another, with or without change of the owner of goods. Each company is obliged to show each movement of goods in their financial accounting. During the goods’ movement within a group of companies from one storage to another, from one owner to another, the total costs of the goods rise. Sales within a group of companies lead, as a rule, to a gain by one of the companies and the logistic expenses of another company. Selling to a consumer provides a profit to the seller company. Therefore, the problem of adequate allocation of logistics expenses and profits between separate legal entity and the task of continuous accounting and control of logistics costs and earnings in large companies, is vital. The automated system for accounting and controlling of logistics costs is suggested. The developed system allows controlling logistics costs of refining, storage and transportation for each ton, pieces, linear or square meters of the shipped cargoes. The System is based on complex algorithms of distribution

  8. Cost effectiveness of DH-network construction. Final report; Kaukolaempoeverkon rakentamisen kehittaeminen; Loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Kivistoe, V.M. [Ekono Energy Ltd, Espoo (Finland)

    1993-12-31

    Construction cost of DH networks were analyzed in the study. Basing on the analysis, those areas of construction activities were selected, where cost effectiveness could be improved. According to the study, the civil works` cost form about half of the total construction cost on small diameter networks and 30..40 % of the cost of larger sizes. The impact of the design on the construction cost should be emphasized. According to the study it is possible to find significant reduction in the construction cost by increased use of twin pipe where the both carrier pipes are included in the same insulation casing. In small network sizes the reduction of cost achievable by the above is about 30..35 % and in larger sizes about 10 % (DN 125..DN 200) when comparing with a design by individual pipes. The use of twin pipe also causes savings in thermal loss. In sizes DN 65 and up, the saving in heat loss is about 90..95 FIM/m which represents about half of the total savings when compared with design by individual pipes. The possibility of prestressing the twin pipe element at factory in order to shorten the installation time at site was also studied and test pipes was also done. By factory prestressing it would be possible to avoid preheating of pipes at construction site. The trench could be backfilled immediately after pipe laying, welding and inspections. Theoretically and based on test pipes done the prestressing of twin pipe element looks very promising. When factory prestressing would be used, the open time of the trench is reduced significantly and for instance the disturbance to traffic is smaller. As well the use of labour and machinery at site could be more effective

  9. Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction

    Directory of Open Access Journals (Sweden)

    Abimbola Olukemi Windapo

    2013-06-01

    Full Text Available This paper investigates the role of statutory health and safety (H&S regulations in managing construction project risks. The study examines whether the decision made by contractors to comply with the regulations, the cost of compliance and savings of H&S regulatory requirements is influenced by the degree or level of risk, which the regulations are trying to prevent. The rationale for the examination stems from previous studies which establish that building designers and contractors perceive the cost of complying with regulations as additional burdens, which they have to conform to, and which are in some cases unnecessary, and also the fact that construction related injuries and fatalities are on the increase. Qualitative and quantitative data obtained from a descriptive survey and H&S site audit by the Master Builder Association of the Western Cape (MBAWC were used as the measurements of risk, level of compliance to regulations, cost of compliance and savings. By correlating the quantitative and qualitative data, there is empirical evidence to support a negative relationship between the degree of risk, level and cost of compliance and cost savings. Based on the study’s findings, this paper concludes that the decision made by contractors to comply with H&S regulatory requirements is influenced by the perceived cost saving on account of compliance and that cost savings are influenced by the probability of accident occurrence which is an element of the degree of risk which the regulation is trying to prevent or control

  10. Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction

    Directory of Open Access Journals (Sweden)

    Abimbola Olukemi Windapo

    2013-06-01

    Full Text Available This paper investigates the role of statutory health and safety (H&S regulations in managing construction project risks. The study examines whether the decision made by contractors to comply with the regulations, the cost of compliance and savings of H&S regulatory requirements is influenced by the degree or level of risk, which the regulations are trying to prevent. The rationale for the examination stems from previous studies which establish that building designers and contractors perceive the cost of complying with regulations as additional burdens, which they have to conform to, and which are in some cases unnecessary, and also the fact that construction related injuries and fatalities are on the increase. Qualitative and quantitative data obtained from a descriptive survey and H&S site audit by the Master Builder Association of the Western Cape (MBAWC were used as the measurements of risk, level of compliance to regulations, cost of compliance and savings. By correlating the quantitative and qualitative data, there is empirical evidence to support a negative relationship between the degree of risk, level and cost of compliance and cost savings. Based on the study’s findings, this paper concludes that the decision made by contractors to comply with H&S regulatory requirements is influenced by the perceived cost saving on account of compliance and that cost savings are influenced by the probability of accident occurrence which is an element of the degree of risk which the regulation is trying to prevent or control.

  11. Construction of road network vulnerability evaluation index based on general travel cost

    Science.gov (United States)

    Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin

    2018-03-01

    With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.

  12. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  13. Costs, health effects and cost-effectiveness of alcohol and tobacco control strategies in Estonia.

    NARCIS (Netherlands)

    Lai, T.; Habicht, J.; Reinap, M.; Chisholm, D.; Baltussen, R.M.P.M.

    2007-01-01

    OBJECTIVE: To assess the population-level costs, effects and cost-effectiveness of different alcohol and tobacco control strategies in Estonia. DESIGN: A WHO cost-effectiveness modelling framework was used to estimate the total costs and effects of interventions. Costs were assessed in Estonian

  14. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  15. Probabilistic prediction of expected ground condition and construction time and costs in road tunnels

    Directory of Open Access Journals (Sweden)

    A. Mahmoodzadeh

    2016-10-01

    Full Text Available Ground condition and construction (excavation and support time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.

  16. Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule

    International Nuclear Information System (INIS)

    Soli T. Khericha

    2006-01-01

    This report presents preliminary technical and functional requirements (T and FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T and FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation

  17. Determination of maximum possible capital costs for NPP construction by foreign construction data

    International Nuclear Information System (INIS)

    Kozlov, V.V.

    2004-01-01

    Advantages and disadvantages of coal power plants and gas power plants are discussed. Important place in the discussion is due to the analysis of possible development of the nuclear power. Basic factors controlling profitableness and competitiveness of different projects are summarized. Competitiveness of the Russian nuclear power in the world is justified [ru

  18. Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules

    Directory of Open Access Journals (Sweden)

    Połoński M.

    2015-03-01

    Full Text Available The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB as separate tasks have been combined with relevant summary tasks by the start–to–start (SS relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS. The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.

  19. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  20. Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Gilbert, Alex; Nugent, Daniel

    2014-01-01

    This study investigates the frequency and magnitude of cost and time overruns occurring during the construction of 401 electricity projects built between 1936 and 2014 in 57 countries. In aggregate, these projects required approximately $820 billion in investment, and amounted to 325,515 MW of installed capacity and 8495 km of transmission lines. We use this sample of projects to test six hypotheses about construction cost overruns related to (1) diseconomies of scale, (2) project delays, (3) technological learning, (4) regulation and markets, (5) decentralization and modularity, and (6) normalization of results to scale. We find that nuclear reactors are the riskiest technology in terms of mean cost escalation as a percentage of budget and frequency; that hydroelectric dams stand apart for their mean cost escalation in total dollars; that many of the hypotheses grounded in the literature appear wrong; and that financing, partnerships, modularity, and accountability may have more to do with overruns than technology. - Highlights: • Many hypotheses about construction overruns grounded in the literature appear wrong. • Nuclear reactors are the most prone to cost overruns as a percentage of budget and frequency. • Hydroelectric dams stand apart for their mean cost escalation in total dollars. • Solar and wind energy systems are least at risk to cost overruns

  1. Use of cost-effective construction technologies in India to mitigate climate change

    Energy Technology Data Exchange (ETDEWEB)

    Sengupta, N. [Forum of Scientists, Engineers and Technologists, Kolkata (India)

    2008-01-10

    Concentration of greenhouse gases plays a major role in raising the earth's temperature. Carbon dioxide, produced from burning of fossil fuels, is the principle greenhouse gas and efforts are being made at international level to reduce its emission through adoption of energy-efficient technologies. The UN Conference on Environment and Development, 1992 made a significant development in this field by initiating the discussion on sustainable development under the Agenda 21. Cost-effective construction technologies can bring down the embodied energy level associated with production of building materials by lowering use of energy-consuming materials. This embodied energy is a crucial factor for sustainable construction practices and effective reduction of the same would contribute in mitigating global warming. The cost-effective construction technologies would emerge as the most acceptable case of sustainable technologies in India both in terms of cost and environment.

  2. Forecasting Construction Cost Index based on visibility graph: A network approach

    Science.gov (United States)

    Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong

    2018-03-01

    Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.

  3. Concrete and steel construction quality control and assurance

    CERN Document Server

    El-Reedy, Mohamed A

    2014-01-01

    Starting with the receipt of materials and continuing all the way through to the final completion of the construction phase, Concrete and Steel Construction: Quality Control and Assurance examines all the quality control and assurance methods involving reinforced concrete and steel structures. This book explores the proper ways to achieve high-quality construction projects, and also provides a strong theoretical and practical background. It introduces information on quality techniques and quality management, and covers the principles of quality control. The book presents all of the quality control and assurance protocols and non-destructive test methods necessary for concrete and steel construction projects, including steel materials, welding and mixing, and testing. It covers welding terminology and procedures, and discusses welding standards and procedures during the fabrication process, as well as the welding codes. It also considers the total quality management system based on ISO 9001, and utilizes numer...

  4. A reply to “Historical construction costs of global nuclear power reactors”

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.; Grubler, Arnulf

    2017-01-01

    present data on the overnight costs of more than half of nuclear reactors built worldwide since the beginning of the nuclear age. The authors claim that this consolidated data set offers more accurate insights than previous country-level assessments. Unfortunately, the authors make analytical choices that mask nuclear power's real construction costs, cherry pick data, and include misleading data on early experimental and demonstration reactors. For those reasons, serious students of such issues should look elsewhere for guidance about understanding the true costs of nuclear power. - Highlights: • claim to accurately assess nuclear plant costs over time. • The authors err by relying on overnight costs, which exclude interest. • The authors cherry pick data (e.g, ignoring problems with French nuclear data). • The article's cherry picked data don’t even support the article's own conclusions. • Lovering et al. is not a reliable source for costs of nuclear power.

  5. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  6. A Refined Basket of Goods Approach for Comparing Construction Costs between Countries

    Directory of Open Access Journals (Sweden)

    Rick Best

    2012-11-01

    Full Text Available Most comparisons of construction industry performance requirethat construction costs be converted to a common base. Existingmechanisms for such conversions produce unreliable results.A proposed method for producing industry-specifi c conversionfactors was tested using a single building type. A basket ofmaterials and labour was identifi ed and weighted to refl ect the costshare of each item in a completed project. Prices for the basketwere gathered in three cities and simple construction specifi cconversion indices were calculated based on the constructionpurchasing power of each currency. The construction purchasingpower parities (CPPPs showed marked differences from otheravailable conversion mechanisms such as exchange rates andgeneral purchasing power parities (PPPs that have been used inprevious international comparison studies. While the study waslimited in scope, and is only the fi rst stage of a longer process, thesubstantial differences in comparative costs based on purchasingpower illustrate the problems inherent in international costcomparisons. For example, comparing Singapore and Sydney,Singapore costs appear to be only 40% of those in Sydney (basedon exchange rates about two-thirds the cost of Sydney (usinggeneral PPPs or almost the same (using the preliminary CPPPs.These results illustrate the problems of converting costs fromlocal currencies to a single base currency and suggest that furtherdevelopment is needed to improve the reliability of outcomes.

  7. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    Science.gov (United States)

    2013-03-01

    construction firms ( Molenaar et al. 1999). The design-build+ method is a form of DB which brings the contractor into the planning phase early to help...of firm fixed prices requires the contractor to commit to a set price early in the design process ( Molenaar et al. 1999). Both firm fixed and cost...Research The performance of MILCON projects based on execution method has been investigated in terms of cost, performance, and schedule. Molenaar

  8. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  9. Construction costs, payback times, and the leaf economics of carnivorous plants.

    Science.gov (United States)

    Karagatzides, Jim D; Ellison, Aaron M

    2009-09-01

    Understanding how different plant species and functional types "invest" carbon and nutrients is a major goal of plant ecologists. Two measures of such investments are "construction costs" (carbon needed to produce each gram of tissue) and associated "payback times" for photosynthesis to recover construction costs. These measurements integrate among traits used to assess leaf-trait scaling relationships. Carnivorous plants are model systems for examining mechanisms of leaf-trait coordination, but no studies have measured simultaneously construction costs of carnivorous traps and their photosynthetic rates to determine payback times of traps. We measured mass-based construction costs (CC(mass)) and photosynthesis (A(mass)) for traps, leaves, roots, and rhizomes of 15 carnivorous plant species grown under greenhouse conditions. There were highly significant differences among species in CC(mass) for each structure. Mean CC(mass) of carnivorous traps (1.14 ± 0.24 g glucose/g dry mass) was significantly lower than CC(mass) of leaves of 267 noncarnivorous plant species (1.47 ± 0.17), but all carnivorous plants examined had very low A(mass) and thus, long payback times (495-1551 h). Our results provide the first clear estimates of the marginal benefits of botanical carnivory and place carnivorous plants at the "slow and tough" end of the universal spectrum of leaf traits.

  10. Construction and Characterization of a Compact, Portable, Low-Cost Colorimeter for the Chemistry Lab

    Science.gov (United States)

    Clippard, Carrie M.; Hughes, William; Chohan, Balwant S.; Sykes, Danny G.

    2016-01-01

    A low-cost and portable colorimeter was constructed featuring a low-voltage programmable color light sensor-to-frequency converter, a CMOS 8-bit microcontroller, and an LCD display. The instrument has successfully facilitated the introduction and application of spectroscopy to groups of middle school, high school, and undergraduate students. A…

  11. 2007 Effect of Changes in Layout Shape on Unit Construction Cost

    African Journals Online (AJOL)

    ezra

    The shape of a building layout is the spatial attribute that defines the outline of the building. ... The results of this study indicate that perimeter-to-floor ratio, unit construction ... Design variables have been defined as the .... The objective of this paper is to explore the effect ... preparation of cost estimate, changing of design.

  12. Construction cost prediction model for conventional and sustainable college buildings in North America

    Directory of Open Access Journals (Sweden)

    Othman Subhi Alshamrani

    2017-03-01

    Full Text Available The literature lacks in initial cost prediction models for college buildings, especially comparing costs of sustainable and conventional buildings. A multi-regression model was developed for conceptual initial cost estimation of conventional and sustainable college buildings in North America. RS Means was used to estimate the national average of construction costs for 2014, which was subsequently utilized to develop the model. The model could predict the initial cost per square feet with two structure types made of steel and concrete. The other predictor variables were building area, number of floors and floor height. The model was developed in three major stages, such as preliminary diagnostics on data quality, model development and validation. The developed model was successfully tested and validated with real-time data.

  13. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  14. Construction cost estimation of spherical storage tanks: artificial neural networks and hybrid regression—GA algorithms

    Science.gov (United States)

    Arabzadeh, Vida; Niaki, S. T. A.; Arabzadeh, Vahid

    2017-10-01

    One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg-Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg-Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.

  15. Optimization and control methods in industrial engineering and construction

    CERN Document Server

    Wang, Xiangyu

    2014-01-01

    This book presents recent advances in optimization and control methods with applications to industrial engineering and construction management. It consists of 15 chapters authored by recognized experts in a variety of fields including control and operation research, industrial engineering, and project management. Topics include numerical methods in unconstrained optimization, robust optimal control problems, set splitting problems, optimum confidence interval analysis, a monitoring networks optimization survey, distributed fault detection, nonferrous industrial optimization approaches, neural networks in traffic flows, economic scheduling of CCHP systems, a project scheduling optimization survey, lean and agile construction project management, practical construction projects in Hong Kong, dynamic project management, production control in PC4P, and target contracts optimization.   The book offers a valuable reference work for scientists, engineers, researchers and practitioners in industrial engineering and c...

  16. SUBSTANTIATION OF THE COST OF HOUSING CONSTRUCTION INCLUDING THE FACTOR OF INVESTMENT ATTRACTIVENESS OF TERRITORIES

    Directory of Open Access Journals (Sweden)

    ZAIATS Yi. I.

    2015-11-01

    Full Text Available Problem statement. For planning and organization of urban construction is necessary to analyze the use of areas. Territorial resources of the city, being used for construction and other urban purposes, consists of plots of land: disposable, reserved and undeveloped in previous years of construction in progress; residential districts and blocks of obsolete housing fund; industrial and municipal and warehouse enterprises being used irrationally or stopped to work; the defence department, where the amortized warehouses and other main funds are that are not used by purpose; agricultural enterprises where the obsolete industrial funds, haying, nurseries, greenhouses. The number of free areas suitable for future urban development is extremely limited. However a considerable part of the territories of almost all functional zones is used inefficiently. Purpose. Formalization of a factor of investment attractiveness of territories for the further identification and research of the connection between it and the cost of housing construction is necessary. Conclusion. The identification of regularities of influence of the factor of investment attractiveness of territories on the cost of construction of high-rise buildings allow to obtain a quantitative estimate of this effect and can be used in the development of the methodology of substantiation of the expediency and effectiveness of the implementation of highrise construction projects, based on organizational and technological aspects.

  17. Optimalization of logistic costs by the controlling approach

    Directory of Open Access Journals (Sweden)

    Katarína Teplická

    2007-10-01

    Full Text Available Article deals with logistic cost problems, their following, reporting and evaluation in the firm. It gives basic information about possible access of the effective decreasing of the logistic cost by the way of controlling access, or evaluation of Balance Score Card. It indicates short algorithm of logistic costs reporting by the way of controlling.

  18. Optimalization of logistic costs by the controlling approach

    OpenAIRE

    Katarína Teplická

    2007-01-01

    Article deals with logistic cost problems, their following, reporting and evaluation in the firm. It gives basic information about possible access of the effective decreasing of the logistic cost by the way of controlling access, or evaluation of Balance Score Card. It indicates short algorithm of logistic costs reporting by the way of controlling.

  19. Transforming Wartime Contracting: Controlling Costs, Reducing Risks

    Science.gov (United States)

    2011-08-01

    conceptual ambiguity lies nestled in the meaning ascribed to “inherent.” The language of the Instruction also serves as an illustration that...other factors to the composite rate to present a fuller accounting of the cost of military personnel. It adds costs for recruitment and advertising ...Defense Adds to above: Costs for recruitment and advertising , training, subsidized groceries (commissaries), education assistance, child-development

  20. Cost of malaria control in Sri Lanka

    DEFF Research Database (Denmark)

    Konradsen, F; Steele, P; Perera, D

    1999-01-01

    to cost Rs 48 (US(40.87) per individual protected per year, less than half the cost of spraying houses with residual insecticides. Larviciding of vector breeding sites and especially the elimination of breeding habitats by flushing streams through seasonal release of water from upstream reservoirs...... was estimated to be cheaper than other preventive measures (Rs 27 (US$ 0.49) and Rs 13 (US$ 0.24) per individual protected, respectively). Inclusion of both operational and capital costs of treatment indicates that the most cost-effective intervention for the government was a centrally located hospital...

  1. Construction and Operation Costs of Wastewater Treatment and Implications for the Paper Industry in China.

    Science.gov (United States)

    Niu, Kunyu; Wu, Jian; Yu, Fang; Guo, Jingli

    2016-11-15

    This paper aims to develop a construction and operation cost model of wastewater treatment for the paper industry in China and explores the main factors that determine these costs. Previous models mainly involved factors relating to the treatment scale and efficiency of treatment facilities for deriving the cost function. We considered the factors more comprehensively by adding a regional variable to represent the economic development level, a corporate ownership factor to represent the plant characteristics, a subsector variable to capture pollutant characteristics, and a detailed-classification technology variable. We applied a unique data set from a national pollution source census for the model simulation. The major findings include the following: (1) Wastewater treatment costs in the paper industry are determined by scale, technology, degree of treatment, ownership, and regional factors; (2) Wastewater treatment costs show a large decreasing scale effect; (3) The current level of pollutant discharge fees is far lower than the marginal treatment costs for meeting the wastewater discharge standard. Key implications are as follows: (1) Cost characteristics and impact factors should be fully recognized when planning or making policies relating to wastewater treatment projects or technology development; (2) There is potential to reduce treatment costs by centralizing wastewater treatment via industrial parks; (3) Wastewater discharge fee rates should be increased; (4) Energy efficient technology should become the future focus of wastewater treatment.

  2. Feasibility of perpetual pavement stage construction in China: A life cycle cost analysis

    Directory of Open Access Journals (Sweden)

    Zhongyin Guo

    2016-12-01

    Full Text Available The main objective of pavement design and management is to build sustainable pavement structure with minimum costs during its whole life. There are many uncertainties in the process of pavement design pertaining many of its variables, such as future traffic estimation, long time behavior of materials, future weights and types of traveling vehicles, availability of funds etc. Therefore, it is important to apply pavement stage construction technique during the process of pavement design and management to minimize the risk associated with these uncertainties. From the beginning of 2000, the research and application of perpetual asphalt pavement (PP technology has been deployed in China. The semi rigid base for asphalt pavement has been normally considered as typical component of high class highways in the design according to the Chinese experience since 1997. The research objective is to apply pavement stage construction for the evaluation of life cycle costs of Chinese perpetual and traditional semi rigid pavements using operational pavement management system in addition to examine its suitability for design and construction of more economical and durable flexible pavements. It has been found that the stage construction of asphalt layers in PP over semi rigid pavement foundation will create more sustainable and trusted pavement structures in spite of 2–5% increase in present total cost.

  3. Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective

    Science.gov (United States)

    Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad

    2017-11-01

    Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.

  4. Construction Costs Assessment of Structural Systems for Low-Rise and Social Welfare Housing

    Directory of Open Access Journals (Sweden)

    Carrillo Julián

    2015-09-01

    Full Text Available A comparative analysis of the costs related to the construction of low-rise, low-cost and social welfare housing was carried out. The study included three of the most commonly used structural systems for low-rise housing in Latin America, such as the traditional system of confined masonry walls, concrete walls conventionally reinforced with welded-wire meshes and concrete walls reinforced with steel fiber. The cost comparison was carried out by budgets analysis, which were performed based on construction quantities, unit prices and particular items for each structural system. It was found in the study that, from an economic point of view, the systems of concrete walls reinforced with welded-wire meshes or steel fibers are more advantageous than confined masonry systems. In addition, the integral comparison of the three structural systems demonstrates that the industrialized system of steel fiber reinforced concrete walls allows obtaining greater advantages of cleaning and sustainability, faster construction, lower cost and a more attractive scenario for builders investing in such projects.

  5. Construction and cost experience regarding the 2nd pool house for spent fuel storage facility in the Atucha Power Station

    International Nuclear Information System (INIS)

    Barbosa, C.A.

    1980-01-01

    The Atucha I second pool house storage for spent fuel is designed as an extension of the Atucha I power station. The two are linked by civil structure, controlling circuits, electrical and compressed air and water supplies, low level wastes disposal, ventilation under pressure maintenance, and, most important, the ability to transfer spent and new fuel in both directions. Because the second pool house is, by location and design, an extension of the existing installation, and since there is no design departure, regarding storage and transfer of fuel from that of the original installation, the rules and regulations applied for its construction were the same as those valid for the Atucha I construction. The requirement not to exceed a four-year period for construction and commissioning was determined by the need to have storage room for the Atucha I fuel. Argentina will meet the 1982 target by having the installation available during the second half of 1981. The second pool house is a wet storage location with a capacity of 1000 tons metallic uranium. It was designed by the Kraftwerk Union of West Germany along the same lines as the 440-ton storage location originally built with the station. The Atomic Energy Commission of Argentina has managed the construction and participated in project and design stages. As in the original pool, the 6 m long assemblies are stacked in double tiers. The cost figures which are mentioned differ from previously released figures and are not the final ones. With civil construction almost finished and mechanical erection started, the present estimates should not differ by more than 10% from the final figures. The installation has an investment cost of 61 million dollars, (1980), and, depending on the amortization time span considered, a total yearly cost per kg of capacity of metallic uranium, ranging between 5.5 and 9.3 dollars per kg

  6. PERSONNEL COSTS IN THE CZECH CONSTRUCTION SECTOR: INVESTIGATING THE EFFECT OF COMPANY SIZE

    Directory of Open Access Journals (Sweden)

    Martina Paulišová

    2017-01-01

    Full Text Available : Managing personnel costs is important in all companies, especially in those whose production is labor intensive. The construction sector therefore qualifies as a suitable area for analyzing issues associated with these costs. The aim of this study is to find out whether company size affects personnel cost management under various circumstances. Four research hypotheses focus on the relationships among and the relative importance of personnel costs, use of standards, range of employee benefits offered, and economic actions taken when faced with an economic crisis. The evaluation of hypotheses is supported by using the chi-square test of independence with the aim of confirming or rejecting the statistical significance of relationships between the examined categorical variables. Results have confirmed a significant effect of company size. Several research implications and suggested future research directions are also presented in the conclusion of this paper.

  7. Use of virtual environments to reduce the construction costs of the next generation nuclear power reactors

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.

    2007-01-01

    The near term deployment of the next generation of reactors will only be successful if they are built on time and without the costly overruns experienced in the previous generation. One critical factor in achieving these goals is to ensure the design is optimized for constructability. In this work the authors explored the effectiveness of full-scale virtual reality simulation in the optimization of the design and construction of the next generation of nuclear reactors. The research tested the suitability of immersive virtual reality display technology in aiding engineers in evaluating potential cost reductions that can be realized by the optimization of design and installation and construction sequences. The intent of this research is to see if this type of technology can be used in capacities similar to those currently filled by full-scale physical mockups and desktop simulations. Using a fully-immersive five sided virtual reality system, known as a CAVE, the authors constructed a series of virtual mockups that represented two next generation nuclear power plants, the Westinghouse AP-1000 and the Pebble Bed Modular Reactor (PBMR). These virtual mockups were then tested as a design tool to help locate and correct problem areas, to optimize the construction sequence, and to assist with familiarizing trades people with the performance of maintenance activities. A series of experiments were performed to assess the usefulness of these virtual mockups in accomplishing these tasks. (authors)

  8. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Vaugh Whisker

    2004-02-28

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project.

  9. Comparative evaluation of low cost materials as constructed wetland filling media

    Science.gov (United States)

    Pinho, Henrique J. O.; Vaz, Mafalda M.; Mateus, Dina M. R.

    2017-11-01

    Three waste materials from civil construction activities were assessed as low cost alternative filling materials used in Constructed Wetlands (CW). CW are green processes for wastewater treatment, whose design includes an appropriate selection of vegetation and filling material. The sustainability of such processes may be incremented using recovered wastes as filling materials. The abilities of the materials to support plant growth and to contribute to pollutants removal from wastewater were assessed and compared to expanded clay, a filling usually used in CW design. Statistical analysis, using one-way ANOVA and Welch's ANOVA, demonstrate that limestone fragments are a better choice of filling material than brick fragments and basalt gravel.

  10. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    International Nuclear Information System (INIS)

    Timothy Shaw; Vaugh Whisker

    2004-01-01

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project

  11. Variance analysis refines overhead cost control.

    Science.gov (United States)

    Cooper, J C; Suver, J D

    1992-02-01

    Many healthcare organizations may not fully realize the benefits of standard cost accounting techniques because they fail to routinely report volume variances in their internal reports. If overhead allocation is routinely reported on internal reports, managers can determine whether billing remains current or lost charges occur. Healthcare organizations' use of standard costing techniques can lead to more realistic performance measurements and information system improvements that alert management to losses from unrecovered overhead in time for corrective action.

  12. Nuclear hazardous waste cost control management

    International Nuclear Information System (INIS)

    Selg, R.A.

    1991-01-01

    The effects of the waste content of glass waste forms on Savannah River high-level waste disposal costs are currently under study to adjust the glass frit content to optimize the glass waste loadings and therefore significantly reduce the overall waste disposal cost. Changes in waste content affect onsite Defense Waste Changes in waste contents affect onsite Defense Waste Processing Facility (DWPF) costs as well as offsite shipping and repository emplacement charges. A nominal 1% increase over the 28 wt% waste loading of DWPF glass would reduce disposal costs by about $50 million for Savannah River wastes generated to the year 2000. Optimization of the glass waste forms to be produced in the SWPF is being supported by economic evaluations of the impact of the forms on waste disposal costs. Glass compositions are specified for acceptable melt processing and durability characteristics, with economic effects tracked by the number of waste canisters produced. This paper presents an evaluation of the effects of variations in waste content of the glass waste forms on the overall cost of the disposal, including offsite shipment and repository emplacement, of the Savannah River high-level wastes

  13. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games.

    Science.gov (United States)

    Liu, Jiacai; Zhao, Wenjian

    2016-11-08

    There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  14. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games

    Directory of Open Access Journals (Sweden)

    Jiacai Liu

    2016-11-01

    Full Text Available There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  15. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    Science.gov (United States)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  16. The application of an integrated approach to design, procurement and construction in reducing overall nuclear power plant costs. Annex 19

    International Nuclear Information System (INIS)

    Didsbury, R.; Shalaby, B.A.; Torgerson, D.F.

    2002-01-01

    As part of its on-going efforts to reduce the cost of CANDU nuclear power plants, AECL has embarked on an integrated approach to design, procurement and construction activities associated with new CANDU 6 and CANDU 9 projects. The approach is predicated on the fact there is a vast quantity of information that needs to be managed and controlled over the life of a nuclear power plant project. Therefore, ensuring the completeness and correctness of all the information needed by all project participants, facilitating sharing of this information amongst the project's participants, and automating the various deliverable production processes offers significant potential not only for overall project cost (and schedule) savings but also for reducing operations and maintenance costs once the plant enters service. Facilitating and indeed of key importance to this approach is the use of a suite of integrated information technology-based engineering, procurement and project control tools used throughout the design, engineering, procurement and construction phases of the project. A unique and important feature of these tools is their high degree of integration both from a work process and a data perspective. Use of these tools is well underway on AECL's Qinshan Project which is realizing significant benefits in cost and schedule. This paper will describe the approach AECL is taking, along with the tools it has both put in place, and those additional items planned for the future along with the cost, schedule and quality benefits that arise from their use. Progress to date on the Qinshan project also will be discussed as well as the expected application to the plant once it has gone into service will also be discussed. (author)

  17. Controlling Campylobacter in the chicken meat chain - Cost-effectiveness and cost-utility analysis

    NARCIS (Netherlands)

    Mangen MJJ; Havelaar AH; Nauta MJ; Koeijer AA de; Wit GA de; LEI; Animal Sciences Group; PZO; MGB

    2005-01-01

    The aim of this study was the estimation of cost-effectiveness and cost-utility of various interventions to control Campylobacter contamination of broiler meat. The relative risk, the intervention costs, the disease burden (expressed in Disability Adjusted Live Years (DALYs)) and the

  18. Open-source digital technologies for low-cost monitoring of historical constructions

    OpenAIRE

    Basto, Camilo; Pelà, Luca; Chacón Flores, Rolando Antonio

    2017-01-01

    This paper shows new possibilities of using novel, open-source, low-cost platforms for the structural health monitoring of heritage structures. The objective of the study is to present an assessment of increasingly available open-source digital modeling and fabrication technologies in order to identify the suitable counterparts of the typical components of a continuous static monitoring system for a historical construction. The results of the research include a simple case-study, which is pre...

  19. A Conceptual Cost Benefit Analysis of Tailings Matrices Use in Construction Applications

    OpenAIRE

    Mahmood Ali A.; Elektorowicz Maria

    2016-01-01

    As part of a comprehensive research program, new tailings matrices are formulated of combinations of tailings and binder materials. The research program encompasses experimental and numerical analysis of the tailings matrices to investigate the feasibility of using them as construction materials in cold climates. This paper discusses a conceptual cost benefit analysis for the use of these new materials. It is shown here that the financial benefits of using the proposed new tailings matrices i...

  20. [Effect of ecological civilized homestead construction on schistosomiasis control].

    Science.gov (United States)

    Tang, Meng; Jia, Tie-Wu; Wu, Zi-Song; Mao, Ping; Chen, Lin; Li, Han-Gang; Zhong, Bo; Qiu, Dong-Chuan; Yao, Qin; Hu, You-Ping

    2012-02-01

    To evaluate the effect of Ecological Civilized Homestead Construction on schistosomiasis control. The data of ecological civilized homestead construction and schistosomiasis control were collected and analyzed in Meiwan Village, Shuangqiao Town, Danling County, Sichuan Province from 2004 to 2010. Ecological Civilized Homestead Construction was carried out from 2004 to 2010. Totally 454 bio-gas pools were built. All the farmers used well water. The popularized rates of the household bio-gas pool, sanitary toilet, sewage treatment pool reached 100%. The number of cattle was 4, which decreased by 91.30% compared with that in 2004, and all the cattle were fed in captivity. The schistosome infection rates of populations were 0.26% and 0.30% in 2005 and 2008, respectively, and nobody was infected in other years. The infection rate of cattle was 0 from 2004 to 2010. The awareness rate of knowledge about schistosomiasis control achieved 100% in the population over 6 years old. Most of the farmers could use certain protective measures while they were farming. The effect of ecological civilized homestead construction on schistosomiasis control is remarkable.

  1. Design and construction of vacuum control system on EAST

    International Nuclear Information System (INIS)

    Wang, L.; Zhang, Y.; Hu, Q.S.; Wang, X.M.; Zhang, X.D.; Hu, J.S.; Yang, Y.; Gu, X.M.

    2008-01-01

    The construction of experimental advanced superconducting tokamak (EAST) was finished at the end of 2006 in Hefei, China. Its vacuum system, an important subsystem, has been commissioned in February 2006. The design and construction of this vacuum control system are described in this paper. The requirements for remote automation, distributed control and centralized management, high reliability and expansibility have been taken into account in the design. There are three levels of control in vacuum control system. The bottom level control is performed on the local instruments manually; the medium level control is based on Siemens S7-400 PLC; the top level control is conducted on IPCs with communication through profi b us network. In addition remote handling and centralized monitoring could be realized by a remote control server. The control system could achieve pumping and fueling of the whole vacuum system. Besides that, it also includes the data acquisition of the pressure and temperature. The details are discussed on the monitoring of vacuum system states including cooling water, power and compressed air, etc., safeguards of plasma chamber and cryostat chamber and vacuum equipments, choosing of control modes corresponding to the plasma discharge and wall conditioning. At the end, the parts of EAST device protection system related to vacuum and gas injection system will also be introduced

  2. Controlling Infrastructure Costs: Right-Sizing the Mission Control Facility

    Science.gov (United States)

    Martin, Keith; Sen-Roy, Michael; Heiman, Jennifer

    2009-01-01

    Johnson Space Center's Mission Control Center is a space vehicle, space program agnostic facility. The current operational design is essentially identical to the original facility architecture that was developed and deployed in the mid-90's. In an effort to streamline the support costs of the mission critical facility, the Mission Operations Division (MOD) of Johnson Space Center (JSC) has sponsored an exploratory project to evaluate and inject current state-of-the-practice Information Technology (IT) tools, processes and technology into legacy operations. The general push in the IT industry has been trending towards a data-centric computer infrastructure for the past several years. Organizations facing challenges with facility operations costs are turning to creative solutions combining hardware consolidation, virtualization and remote access to meet and exceed performance, security, and availability requirements. The Operations Technology Facility (OTF) organization at the Johnson Space Center has been chartered to build and evaluate a parallel Mission Control infrastructure, replacing the existing, thick-client distributed computing model and network architecture with a data center model utilizing virtualization to provide the MCC Infrastructure as a Service. The OTF will design a replacement architecture for the Mission Control Facility, leveraging hardware consolidation through the use of blade servers, increasing utilization rates for compute platforms through virtualization while expanding connectivity options through the deployment of secure remote access. The architecture demonstrates the maturity of the technologies generally available in industry today and the ability to successfully abstract the tightly coupled relationship between thick-client software and legacy hardware into a hardware agnostic "Infrastructure as a Service" capability that can scale to meet future requirements of new space programs and spacecraft. This paper discusses the benefits

  3. Slurry walls and slurry trenches - construction quality control

    International Nuclear Information System (INIS)

    Poletto, R.J.; Good, D.R.

    1997-01-01

    Slurry (panel) walls and slurry trenches have become conventional methods for construction of deep underground structures, interceptor trenches and hydraulic (cutoff) barriers. More recently polymers mixed with water are used to stabilize the excavation instead of bentonite slurry. Slurry walls are typically excavated in short panel segments, 2 to 7 m (7 to 23 ft) long, and backfilled with structural materials; whereas slurry trenches are fairly continuous excavations with concurrent backfilling of blended soils, or cement-bentonite mixtures. Slurry trench techniques have also been used to construct interceptor trenches. Currently no national standards exist for the design and/or construction of slurry walls/trenches. Government agencies, private consultants, contractors and trade groups have published specifications for construction of slurry walls/trenches. These specifications vary in complexity and quality of standards. Some place excessive emphasis on the preparation and control of bentonite or polymer slurry used for excavation, with insufficient emphasis placed on quality control of bottom cleaning, tremie concrete, backfill placement or requirements for the finished product. This has led to numerous quality problems, particularly with regard to identification of key depths, bottom sediments and proper backfill placement. This paper will discuss the inspection of slurry wall/trench construction process, identifying those areas which require special scrutiny. New approaches to inspection of slurry stabilized excavations are discussed

  4. Measuring the environmental costs of tidal power plant construction: A choice experiment study

    International Nuclear Information System (INIS)

    Lee, Joo-Suk; Yoo, Seung-Hoon

    2009-01-01

    Korea is considering the construction of a tidal power plant (TPP) at Garolim Bay. However, as the construction of the Garolim TPP (GTPP) is expected to entail some environmental damage, it has become an increasingly important topic for public debate. Using a choice experiment (CE) approach, this study attempts to measure the economic cost that results from the environmental damage caused by the construction of GTPP. The CE is used to measure the environmental costs of individual attributes, including the reduction in the area of the tidal flat, the degradation of seawater quality, and the destruction of marine life. The results indicate that the annual willingness to pay (WTP) per household for mitigating the environmental damage that results from the worst-possible situation in relation to the present situation is about 96,042 Korean won (USD 101.1) in the seven biggest cities (off-site regions) and 18,584 Korean won (USD 19.6) in Seosan and Taean (on-site regions). This study is expected to provide policy-makers with quantitative information that will be useful to decide whether or not GTPP should be constructed.

  5. Design Optimization and Construction of the Thyratron/PFN Based Cost Model Modulator for the NLC

    International Nuclear Information System (INIS)

    Koontz, Roland F

    1999-01-01

    As design studies and various R and D efforts continue on Next Linear Collider (NLC) systems, much R and D work is being done on X-Band klystron development, and development of pulse modulators to drive these X-Band klystrons. A workshop on this subject was held at SLAC in June of 1998, and a follow-up workshop is scheduled at SLAC June 23-25, 1999. At the 1998 workshop, several avenues of R and D were proposed using solid state switching, induction LINAC principles, high voltage hard tubes, and a few more esoteric ideas. An optimized version of the conventional thyratron-PFN-pulse transformer modulator for which there is extensive operating experience is also a strong candidate for use in the NLC. Such a modulator is currently under construction for base line demonstration purposes. The performance of this ''Cost Model'' modulator will be compared to other developing technologies. Important parameters including initial capital cost, operating maintenance cost, reliability, maintainability, power efficiency, in addition to the usual operating parameters of pulse flatness, timing and pulse height jitter, etc. will be considered in the choice of a modulator design for the NLC. This paper updates the progress on this ''Cost Model'' modulator design and construction

  6. A novel abutment construction technique for rapid bridge construction : controlled low strength Materials (CLSM) with full-height concrete panels.

    Science.gov (United States)

    2012-01-01

    One of the major obstacles facing rapid bridge construction for typical span type bridges is the time required to construct bridge abutments and foundations. This can be remedied by using the controlled low strength materials (CLSM) bridge abutment. ...

  7. The integration of price/cost modelling and construction planning - the automated generation of construc­tion operation

    Directory of Open Access Journals (Sweden)

    P. A. Bowen

    1997-07-01

    Full Text Available The fact that traditional price/cost models are unrelated to the construction process renders them largely unsuited to the provision of meaningful price/cost advice. The nature and lengthiness of the construction planning process has precluded its incorporation into price/cost modelling during the pre-tender phase of the traditional building procurement process. The nub of the modelling problem has been how to integrate the complex process of construction planning into the pre-tender price/cost modelling process. In this paper the authors propose the synthesis of artificial intelligence techniques and construction planning techniques, resulting in a conceptual framework for a network-based cost modelling system for use by quantity surveyors in the cost modelling of buildings.

  8. Inventory control with multiple setup costs

    NARCIS (Netherlands)

    Alp, O.; Huh, W.T.; Tan, T.

    2014-01-01

    We consider an infinite-horizon, periodic-review, single-item production/inventory system with random demand and backordering, where multiple setups are allowed in any period and a separate fixed cost is associated for each setup. Contrary to the majority of the literature on this topic, we do not

  9. Rate-cost tradeoffs in control

    KAUST Repository

    Kostina, Victoria; Hassibi, Babak

    2017-01-01

    function is the mean-square deviation of the system state from the desired state. We study the fundamental tradeoff between the communication rate r bits/sec and the limsup of the expected cost b, and show a lower bound on the rate necessary to attain b

  10. Components of the costs of controlling quality: a transaction cost economics approach.

    Science.gov (United States)

    Stiles, R A; Mick, S S

    1997-01-01

    This article identifies the components that contribute to a healthcare organization's costs in controlling quality. A central tenet of our argument is that at its core, quality is the result of a series of transactions among members of a diverse network. Transaction cost economics is applied internally to analyze intraorganizational transactions that contribute to quality control, and questions for future research are posed.

  11. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  12. Risk-Sensitive Control with Near Monotone Cost

    International Nuclear Information System (INIS)

    Biswas, Anup; Borkar, V. S.; Suresh Kumar, K.

    2010-01-01

    The infinite horizon risk-sensitive control problem for non-degenerate controlled diffusions is analyzed under a 'near monotonicity' condition on the running cost that penalizes large excursions of the process.

  13. Cost effectiveness analysis of indoor radon control measures

    International Nuclear Information System (INIS)

    Fujimoto, Kenzo

    1989-01-01

    The problem of radon 222 in buildings as a contributor to radiation exposure is described. Five different control methods and the dose reductions that would result from each are analysed. The annualized cost for each control measure was evaluated and the cost effectiveness of each control measure was calculated on the basis of dollars per person-sievert dose reduction. The use of unipolar ion generators for particle removal appears to be the most cost effective and the use of ceiling fans to increase air circulation the least cost effective. 3 figs., 1 tab

  14. Humans, 'things' and space: costing hospital infection control interventions.

    Science.gov (United States)

    Page, K; Graves, N; Halton, K; Barnett, A G

    2013-07-01

    Previous attempts at costing infection control programmes have tended to focus on accounting costs rather than economic costs. For studies using economic costs, estimates tend to be quite crude and probably underestimate the true cost. One of the largest costs of any intervention is staff time, but this cost is difficult to quantify and has been largely ignored in previous attempts. To design and evaluate the costs of hospital-based infection control interventions or programmes. This article also discusses several issues to consider when costing interventions, and suggests strategies for overcoming these issues. Previous literature and techniques in both health economics and psychology are reviewed and synthesized. This article provides a set of generic, transferable costing guidelines. Key principles such as definition of study scope and focus on large costs, as well as pitfalls (e.g. overconfidence and uncertainty), are discussed. These new guidelines can be used by hospital staff and other researchers to cost their infection control programmes and interventions more accurately. Copyright © 2013 The Healthcare Infection Society. Published by Elsevier Ltd. All rights reserved.

  15. 7 CFR 1219.52 - Control of administrative costs.

    Science.gov (United States)

    2010-01-01

    ... Board shall implement a system of cost controls based on normally accepted business practices to: (1... 7 Agriculture 10 2010-01-01 2010-01-01 false Control of administrative costs. 1219.52 Section 1219.52 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING...

  16. Construction of a WMR for Trajectory Tracking Control: Experimental Results

    Directory of Open Access Journals (Sweden)

    R. Silva-Ortigoza

    2013-01-01

    Full Text Available This paper reports a solution for trajectory tracking control of a differential drive wheeled mobile robot (WMR based on a hierarchical approach. The general design and construction of the WMR are described. The hierarchical controller proposed has two components: a high-level control and a low-level control. The high-level control law is based on an input-output linearization scheme for the robot kinematic model, which provides the desired angular velocity profiles that the WMR has to track in order to achieve the desired position (x*,y* and orientation (φ*. Then, a low-level control law, based on a proportional integral (PI approach, is designed to control the velocity of the WMR wheels to ensure those tracking features. Regarding the trajectories, this paper provides the solution or the following cases: (1 time-varying parametric trajectories such as straight lines and parabolas and (2 smooth curves fitted by cubic splines which are generated by the desired data points x1*,y1*,…,xn*,yn*. A straightforward algorithm is developed for constructing the cubic splines. Finally, this paper includes an experimental validation of the proposed technique by employing a DS1104 dSPACE electronic board along with MATLAB/Simulink software.

  17. The preliminary analysis of establishing the cost control system of AP1000 for the Haiyang nuclear power project

    International Nuclear Information System (INIS)

    Li Jing; Li Xiaobing

    2012-01-01

    The AP1000 technology has been first applied to Nuclear Power Plant construction in China. Haiyang Project is the second plant which applies the new technology, and it is the key to the success of the project, that how to control the cost. The cost control of AP1000 is to manage and monitor all the cost of the project, including the cost of project management, design, procurement, construction, and startup/commissioning. For the Haiyang Project, the cost control system should be established to ensure that the evaluation of the procurement order should be covered in the original budget, and all potential commitments are evaluated and approved within the confinement of cost control, and reduce the risk of the first reactor and get the most profit. (authors)

  18. Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

    Directory of Open Access Journals (Sweden)

    D. Mirzai Matin

    2016-08-01

    Full Text Available Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

  19. Cost and cost-effectiveness of PPM-DOTS for tuberculosis control: evidence from India.

    OpenAIRE

    Floyd, Katherine; Arora, V. K.; Murthy, K. J. R.; Lonnroth, Knut; Singla, Neeta; Akbar, Y.; Zignol, Matteo; Uplekar, Mukund

    2006-01-01

    OBJECTIVE: To assess the cost and cost-effectiveness of the Public-Private Mix DOTS (PPM-DOTS) strategy for tuberculosis (TB) control in India. METHODS: We collected data on the costs and effects of pilot PPM-DOTS projects in Delhi and Hyderabad using documentary data and interviews. The cost of PPM-DOTS was compared with public sector DOTS (i.e. DOTS delivered through public sector facilities only) and non-DOTS treatment in the private sector. Costs for 2002 in US$ were assessed for the publ...

  20. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  1. Reactive control processes contributing to residual switch cost and mixing cost across the adult lifespan.

    Science.gov (United States)

    Whitson, Lisa R; Karayanidis, Frini; Fulham, Ross; Provost, Alexander; Michie, Patricia T; Heathcote, Andrew; Hsieh, Shulan

    2014-01-01

    In task-switching paradigms, performance is better when repeating the same task than when alternating between tasks (switch cost) and when repeating a task alone rather than intermixed with another task (mixing cost). These costs remain even after extensive practice and when task cues enable advanced preparation (residual costs). Moreover, residual reaction time mixing cost has been consistently shown to increase with age. Residual switch and mixing costs modulate the amplitude of the stimulus-locked P3b. This mixing effect is disproportionately larger in older adults who also prepare more for and respond more cautiously on these "mixed" repeat trials (Karayanidis et al., 2011). In this paper, we analyze stimulus-locked and response-locked P3 and lateralized readiness potentials to identify whether residual switch and mixing cost arise from the need to control interference at the level of stimulus processing or response processing. Residual mixing cost was associated with control of stimulus-level interference, whereas residual switch cost was also associated with a delay in response selection. In older adults, the disproportionate increase in mixing cost was associated with greater interference at the level of decision-response mapping and response programming for repeat trials in mixed-task blocks. These findings suggest that older adults strategically recruit greater proactive and reactive control to overcome increased susceptibility to post-stimulus interference. This interpretation is consistent with recruitment of compensatory strategies to compensate for reduced repetition benefit rather than an overall decline on cognitive flexibility.

  2. Towards a Transaction Cost Theory of Management Control

    NARCIS (Netherlands)

    R.F. Speklé (Roland)

    2002-01-01

    textabstractIn this paper, I present and discuss a theory of management control based on Transaction Cost Economics. This theory specifies the composition of various archetypal control structures, and links these to their respective habitat. These are: (1) arm's length control; (2) machine control;

  3. Construction of low-cost, Mod-OA wood composite wind turbine blades

    Science.gov (United States)

    Lark, R. F.

    1983-01-01

    Two sixty-foot, low-cost, wood composite blades for service on 200 kW Mod-OA wind turbines were constructed. The blades were constructed of epoxy resin-bonded Douglas fir veneers for the leading edge sections, and paper honeycombcored, birch plywood faced panels for the afterbody sections. The blades were joined to the wind turbine hub by epoxy resin-bonded steel load take-off studs embedded into the root end of the blades. The blades were installed on the 200 kW Mod-OA wind turbine facility at Kahuku, Hawaii, The blades completed nearly 8,000 hours of operation over an 18 month period at an average power of 150 kW prior to replacement with another set of wood composite blades. The blades were replaced because of a corrosion failure of the steel shank on one stud. Inspections showed that the wood composite structure remained in excellent condition.

  4. Optimal treatment cost allocation methods in pollution control

    International Nuclear Information System (INIS)

    Chen Wenying; Fang Dong; Xue Dazhi

    1999-01-01

    Total emission control is an effective pollution control strategy. However, Chinese application of total emission control lacks reasonable and fair methods for optimal treatment cost allocation, a critical issue in total emission control. The author considers four approaches to allocate treatment costs. The first approach is to set up a multiple-objective planning model and to solve the model using the shortest distance ideal point method. The second approach is to define degree of satisfaction for cost allocation results for each polluter and to establish a method based on this concept. The third is to apply bargaining and arbitration theory to develop a model. The fourth is to establish a cooperative N-person game model which can be solved using the Shapley value method, the core method, the Cost Gap Allocation method or the Minimum Costs-Remaining Savings method. These approaches are compared using a practicable case study

  5. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  6. A Conceptual Cost Benefit Analysis of Tailings Matrices Use in Construction Applications

    Directory of Open Access Journals (Sweden)

    Mahmood Ali A.

    2016-01-01

    Full Text Available As part of a comprehensive research program, new tailings matrices are formulated of combinations of tailings and binder materials. The research program encompasses experimental and numerical analysis of the tailings matrices to investigate the feasibility of using them as construction materials in cold climates. This paper discusses a conceptual cost benefit analysis for the use of these new materials. It is shown here that the financial benefits of using the proposed new tailings matrices in terms of environmental sustainability are much higher when compared to normal sand matrices.

  7. Design, construction and commissioning of a simple, low cost permanent magnet quadrupole doublet

    International Nuclear Information System (INIS)

    Conard, E.M.; Parcell, S.K.; Arnott, D.W.

    1999-01-01

    In the framework of new beam line developments at the Australian National Medical Cyclotron, a permanent magnet quadrupole doublet was designed and built entirely in house. The design proceeded from the classical work by Halbach et al. but emphasised the 'low cost' aspect by using simple rectangular NdFeB blocks and simple assembly techniques. Numerical simulations using the (2-D) Gemini code were performed to check the field strength and homogeneity predictions of analytical calculations. This paper gives the reasons for the selection of a permanent magnet, the design and construction details of the quadrupole doublet and its field measurement results. (authors)

  8. Modern methods of cost saving of the production activity in construction

    Science.gov (United States)

    Silka, Dmitriy

    2017-10-01

    Every time economy faces recession, cost saving questions acquire increased urgency. This article shows how companies of the construction industry have switched to the new kind of economic relations over recent years. It is specified that the dominant type of economic relations does not allow to quickly reorient on the necessary tools in accordance with new requirements of economic activity. Successful experience in the new environment becomes demanded. Cost saving methods, which were proven in other industries, are offered for achievement of efficiency and competitiveness of the companies. Analysis is performed on the example of the retail sphere, which, according to the authoritative analytical reviews, is extremely innovative on both local and world economic levels. At that, methods, based on the modern unprecedentedly high opportunities of communications and informational exchange took special place among offered methods.

  9. Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method

    Science.gov (United States)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat

    2017-07-01

    Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.

  10. Research into command, control, and communications in space construction

    Science.gov (United States)

    Davis, Randal

    1990-01-01

    Coordinating and controlling large numbers of autonomous or semi-autonomous robot elements in a space construction activity will present problems that are very different from most command and control problems encountered in the space business. As part of our research into the feasibility of robot constructors in space, the CSC Operations Group is examining a variety of command, control, and communications (C3) issues. Two major questions being asked are: can we apply C3 techniques and technologies already developed for use in space; and are there suitable terrestrial solutions for extraterrestrial C3 problems? An overview of the control architectures, command strategies, and communications technologies that we are examining is provided and plans for simulations and demonstrations of our concepts are described.

  11. Iliac crest autograft versus alternative constructs for anterior cervical spine surgery: Pros, cons, and costs

    Science.gov (United States)

    Epstein, Nancy E.

    2012-01-01

    Background: Grafting choices available for performing anterior cervical diskectomy/fusion (ACDF) procedures have become a major concern for spinal surgeons, and their institutions. The “gold standard”, iliac crest autograft, may still be the best and least expensive grafting option; it deserves to be reassessed along with the pros, cons, and costs for alternative grafts/spacers. Methods: Although single or multilevel ACDF have utilized iliac crest autograft for decades, the implant industry now offers multiple alternative grafting and spacer devices; (allografts, cages, polyether-etherketone (PEEK) amongst others). While most studies have focused on fusion rates and clinical outcomes following ACDF, few have analyzed the “value-added” of these various constructs (e.g. safety/efficacy, risks/complications, costs). Results: The majority of studies document 95%-100% fusion rates when iliac crest autograft is utilized to perform single level ACDF (X-ray or CT confirmed at 6-12 postoperative months). Although many allograft studies similarly quote 90%-100% fusion rates (X-ray alone confirmed at 6-12 postoperative months), a recent “post hoc analysis of data from a prospective multicenter trial” (Riew KD et. al., CSRS Abstract Dec. 2011; unpublished) revealed a much higher delayed fusion rate using allografts at one year 55.7%, 2 years 87%, and four years 92%. Conclusion: Iliac crest autograft utilized for single or multilevel ACDF is associated with the highest fusion, lowest complication rates, and significantly lower costs compared with allograft, cages, PEEK, or other grafts. As spinal surgeons and institutions become more cost conscious, we will have to account for the “value added” of these increasingly expensive graft constructs. PMID:22905321

  12. Quality Control of Concrete Structure For APR1400 Construction

    International Nuclear Information System (INIS)

    Seo, Inseop; Song, Changhak; Kim, Duill

    2012-01-01

    Nuclear structure shall be constructed to protect internal facilities in the normal operation against external accidents such as the radiation shielding, earthquakes and to be leak-proof of radioactive substances to the external environment in case of loss of coolants. containment and auxiliary building of nuclear power plants are built in reinforced concrete structures to maintain these protection functions. Nuclear structures shall be designed to ensure soundness in operation since they are located on the waterfront where is easy do drain the cooling water and so deterioration and damage of concrete structures caused by seawater can occur. Durability is ensured for concrete structures of APR1400, a Korea standard NPP, in compliance with all safety requirements. In particular, owners perform quality control directly on the production and pouring of cast in place concrete for the concrete structure construction to make sure concrete structures established with quality homogeneity and durability. This report is to look into the quality control standard and management status of cast in place concrete for APR1400 construction

  13. Costs and cost-effectiveness of malaria control interventions - a systematic review

    Directory of Open Access Journals (Sweden)

    White Michael T

    2011-11-01

    Full Text Available Abstract Background The control and elimination of malaria requires expanded coverage of and access to effective malaria control interventions such as insecticide-treated nets (ITNs, indoor residual spraying (IRS, intermittent preventive treatment (IPT, diagnostic testing and appropriate treatment. Decisions on how to scale up the coverage of these interventions need to be based on evidence of programme effectiveness, equity and cost-effectiveness. Methods A systematic review of the published literature on the costs and cost-effectiveness of malaria interventions was undertaken. All costs and cost-effectiveness ratios were inflated to 2009 USD to allow comparison of the costs and benefits of several different interventions through various delivery channels, across different geographical regions and from varying costing perspectives. Results Fifty-five studies of the costs and forty three studies of the cost-effectiveness of malaria interventions were identified, 78% of which were undertaken in sub-Saharan Africa, 18% in Asia and 4% in South America. The median financial cost of protecting one person for one year was $2.20 (range $0.88-$9.54 for ITNs, $6.70 (range $2.22-$12.85 for IRS, $0.60 (range $0.48-$1.08 for IPT in infants, $4.03 (range $1.25-$11.80 for IPT in children, and $2.06 (range $0.47-$3.36 for IPT in pregnant women. The median financial cost of diagnosing a case of malaria was $4.32 (range $0.34-$9.34. The median financial cost of treating an episode of uncomplicated malaria was $5.84 (range $2.36-$23.65 and the median financial cost of treating an episode of severe malaria was $30.26 (range $15.64-$137.87. Economies of scale were observed in the implementation of ITNs, IRS and IPT, with lower unit costs reported in studies with larger numbers of beneficiaries. From a provider perspective, the median incremental cost effectiveness ratio per disability adjusted life year averted was $27 (range $8.15-$110 for ITNs, $143 (range $135

  14. Construction Management Meets Today's Realities.

    Science.gov (United States)

    Day, C. William

    1979-01-01

    Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)

  15. A worksite prevention program for construction workers: design of a randomized controlled trial.

    Science.gov (United States)

    Oude Hengel, Karen M; Joling, Catelijne I; Proper, Karin I; Blatter, Birgitte M; Bongers, Paulien M

    2010-06-14

    A worksite prevention program was developed to promote the work ability of construction workers and thereby prolong a healthy working life. The objective of this paper is to present the design of a randomized controlled trial evaluating the effectiveness of that intervention program compared with usual care for construction workers. The study is designed as a randomized controlled trial with a follow-up of one year. Employees eligible for this study are construction workers performing actual construction work. The worksite intervention will be compared with usual care. This intervention was developed by using the Intervention Mapping approach and consists of the following components: (1) two individual training sessions of a physical therapist to lower the physical workload, (2) a Rest-Break tool to improve the balance between work and recovery, and (3) two empowerment training sessions to increase the influence of the construction workers at the worksite. Outcome measures are assessed at baseline, 3, 6, and 12 months. The primary outcome measures of this study are work ability and health-related quality of life. Secondary outcome measures include need for recovery, musculoskeletal complaints, work engagement and self efficacy. Cost-effectiveness will be evaluated from the company perspective. Moreover, a process evaluation will be conducted. The feasibility of the intervention and the study has been enhanced by creating an intervention program that explicitly appeals to construction workers and will not interfere too much with the ongoing construction. The feasibility and effectiveness of this worksite prevention program will be investigated by means of an effect- and a process evaluation. If proven effective, this worksite prevention program can be implemented on a larger scale within the construction industry. NTR1278.

  16. A worksite prevention program for construction workers: design of a randomized controlled trial

    Directory of Open Access Journals (Sweden)

    Proper Karin I

    2010-06-01

    Full Text Available Abstract Background A worksite prevention program was developed to promote the work ability of construction workers and thereby prolong a healthy working life. The objective of this paper is to present the design of a randomized controlled trial evaluating the effectiveness of that intervention program compared with usual care for construction workers. Methods The study is designed as a randomized controlled trial with a follow-up of one year. Employees eligible for this study are construction workers performing actual construction work. The worksite intervention will be compared with usual care. This intervention was developed by using the Intervention Mapping approach and consists of the following components: (1 two individual training sessions of a physical therapist to lower the physical workload, (2 a Rest-Break tool to improve the balance between work and recovery, and (3 two empowerment training sessions to increase the influence of the construction workers at the worksite. Outcome measures are assessed at baseline, 3, 6, and 12 months. The primary outcome measures of this study are work ability and health-related quality of life. Secondary outcome measures include need for recovery, musculoskeletal complaints, work engagement and self efficacy. Cost-effectiveness will be evaluated from the company perspective. Moreover, a process evaluation will be conducted. Discussion The feasibility of the intervention and the study has been enhanced by creating an intervention program that explicitly appeals to construction workers and will not interfere too much with the ongoing construction. The feasibility and effectiveness of this worksite prevention program will be investigated by means of an effect- and a process evaluation. If proven effective, this worksite prevention program can be implemented on a larger scale within the construction industry. Trial Registration NTR1278

  17. Multiagent-based Distributed Control for Operation Cost Minimization of Droop Controlled DC Microgrid Using Incremental Cost Consensus

    DEFF Research Database (Denmark)

    Li, Chendan; Quintero, Juan Carlos Vasquez; Guerrero, Josep M.

    2015-01-01

    In this paper, a multiagent based distributed control is proposed for DC microgrid to minimize the operation cost. The power of each distributed generator (DG) is dispatched in a distributed manner in a multiagent system by means of voltage scheduling. Every DG unit is taken as an agent......, and they share the load corresponding to the operation cost of all the units in the system with only communication with direct neighbors through incremental cost consensus. The power regulation according to the power reference generated by consensus is implemented through voltage scheduling in local primary...... controllers. Simulation verification shows that total operation cost of the DC microgrid is successfully reduced though the proposed method....

  18. E-learning: controlling costs and increasing value.

    Science.gov (United States)

    Walsh, Kieran

    2015-04-01

    E-learning now accounts for a substantial proportion of medical education provision. This progress has required significant investment and this investment has in turn come under increasing scrutiny so that the costs of e-learning may be controlled and its returns maximised. There are multiple methods by which the costs of e-learning can be controlled and its returns maximised. This short paper reviews some of those methods that are likely to be most effective and that are likely to save costs without compromising quality. Methods might include accessing free or low-cost resources from elsewhere; create short learning resources that will work on multiple devices; using open source platforms to host content; using in-house faculty to create content; sharing resources between institutions; and promoting resources to ensure high usage. Whatever methods are used to control costs or increase value, it is most important to evaluate the impact of these methods.

  19. Neuromuscular training in construction workers: a longitudinal controlled pilot study.

    Science.gov (United States)

    Faude, Oliver; Donath, Lars; Bopp, Micha; Hofmann, Sara; Erlacher, Daniel; Zahner, Lukas

    2015-08-01

    Many accidents at construction sites are due to falls. An exercise-based workplace intervention may improve intrinsic fall risk factors. In this pilot study, we aimed at evaluating the effects of neuromuscular exercise on static and functional balance performance as well as on lower limb explosive power in construction workers. Healthy middle-aged construction workers were non-randomly assigned to an intervention [N = 20, age = 40.3 (SD 8.3) years] or a control group [N = 20, age = 41.8 (9.9) years]. The intervention group performed static and dynamic balance and strength exercises (13 weeks, 15 min each day). Before and after the intervention and after an 8-week follow-up, unilateral postural sway, backward balancing (on 3- and 4.5-cm-wide beams) as well as vertical jump height were assessed. We observed a group × time interaction for postural sway (p = 0.002) with a reduction in the intervention group and no relevant change in the control group. Similarly, the number of successful steps while walking backwards on the 3-cm beam increased only in the intervention group (p = 0.047). These effects were likely to most likely practically beneficial from pretest to posttest and to follow-up test for postural sway (+12%, standardized mean difference (SMD) = 0.65 and 17%, SMD = 0.92) and backward balancing on the 3-cm beam (+58%, SMD = 0.59 and 37%, SMD = 0.40). Fifteen minutes of neuromuscular training each day can improve balance performance in construction workers and, thus, may contribute to a decreased fall risk.

  20. Economics of tobacco control research initiative: Operating costs for ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Economics of tobacco control research initiative: Operating costs for capacity building ... (but misinformed) beliefs about the economic benefits of the tobacco industry ... Nutrition, health policy, and ethics in the age of public-private partnerships.

  1. Design and Construction of Wireless Control System for Drilling Machine

    Directory of Open Access Journals (Sweden)

    Nang Su Moan Hsam

    2015-06-01

    Full Text Available Abstract Drilling machine is used for boring holes in various materials and used in woodworking metalworking construction and do-it-yourself projects. When the machine operate for a long time the temperature increases and so we need to control the temperature of the machine and some lubrication system need to apply to reduce the temperature. Due to the improvement of technology the system can be controlled with wireless network. This control system use Window Communication Foundation WCF which is the latest service oriented technology to control all drilling machines in industries simultaneously. All drilling machines are start working when they received command from server. After the machine is running for a long time the temperature is gradually increased. This system used LM35 temperature sensor to measure the temperature. When the temperature is over the safely level that is programmed in host server the controller at the server will command to control the speed of motor and applying some lubrication system at the tip and edges of drill. The command from the server is received by the client and sends to PIC. In this control system PIC microcontroller is used as an interface between the client computer and the machine. The speed of motor is controlled with PWM and water pump system is used for lubrication. This control system is designed and simulated with 12V DC motor LM35 sensor LCD displayand relay which is to open the water container to spray water between drill and work piece. The host server choosing to control the drilling machine that are overheat by selecting the clients IP address that is connected with that machine.

  2. Controlling Capital Costs in High Performance Office Buildings: A Review of Best Practices for Overcoming Cost Barriers

    Energy Technology Data Exchange (ETDEWEB)

    Pless, S.; Torcellini, P.

    2012-05-01

    This paper presents a set of 15 best practices for owners, designers, and construction teams of office buildings to reach high performance goals for energy efficiency, while maintaining a competitive budget. They are based on the recent experiences of the owner and design/build team for the Research Support Facility (RSF) on National Renewable Energy Facility's campus in Golden, CO, which show that achieving this outcome requires each key integrated team member to understand their opportunities to control capital costs.

  3. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  4. Fiscal Interactions and the Costs of Controlling Pollution from Electricity

    OpenAIRE

    Parry, Ian

    2004-01-01

    This paper quantifies the costs of controlling SO2, carbon, and NOx emissions from power generation, accounting for interactions between environmental policies and the broader fiscal system. We distinguish a dirty technology (coal) that satisfies baseload demand and a clean technology (gas) that is used during peak periods, and we distinguish sectors with and without regulated prices. Estimated emissions control costs are substantially lower than in previous models of fiscal interactions that...

  5. Control and costs of management; Mejora de la logistica inversa, control y costes de gestion

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Ramos, M.

    2002-07-01

    Companies are being forced to set up Reverse Supply Chains because of environmental regulations or consumer pressures. Reverse Supply Chain is the series of activities required to retrieve a used product from a customer and either dispose of it or reuse it. And for a growing number of manufacturers, in industries ranging from packaging to computer. Reverse Supply Chains are becoming an essential part of business. Pricewaterhouse Coopers ? Spain, as an organization with clients in multiple industries and governments we are acutely aware of the potential impact that Reverse Supply chain have, both in the results and in the competitive positioning of our clients. It can help to boost benefits, reducing purchasing costs and reducing inventory, cut cycle times along the value reverse chain, control and reduce risks of discontinuity in supply to recycled. Ultimately, the Reverse Supply Chain can be deployed to integrate, manufacturers, distributors, marketers, recycles and customers,and governments thanks to the latest developments in e-business. We understand the challenges and opportunities that are inherent in Reverse Supply Chain Management in our country both for global and local businesses. (Author)

  6. Reactive control processes contributing to residual switch cost and mixing cost in young and old adults

    Directory of Open Access Journals (Sweden)

    Lisa Rebecca Whitson

    2014-04-01

    Full Text Available In task-switching paradigms, performance is better when repeating the same task than when alternating between tasks (switch cost and when repeating a task alone rather than intermixed with another task (mixing cost. These costs remain even after extensive practice and when task cues enable advanced preparation (residual costs. Moreover, residual RT mixing cost has been consistently shown to increase with age. Residual switch and mixing costs modulate the amplitude of the stimulus-locked P3b. This mixing effect is disproportionately larger in older adults who also prepare more for and respond more cautiously on these ‘mixed’ repeat trials (Karayanidis et al., 2011. In this study, we examine stimulus-locked and response-locked P3 and lateralized readiness potentials to identify whether residual switch and mixing cost arise from the need to control interference at the level of stimulus processing or response processing. Residual mixing cost was associated with control of stimulus-level interference, whereas residual switch cost was also associated with a delay in response selection. In older adults, the disproportionate increase in mixing cost was associated with greater interference at the level of decision-response mapping and response programming for repeat trials in mixed-task blocks. We argue that, together with evidence of greater proactive control and more cautious responding for these trials, these findings suggest that older adults strategically recruit greater proactive and reactive control to overcome increased susceptibility to post-stimulus interference. This interpretation is consistent with recruitment of compensatory strategies to compensate for reduced repetition benefit rather than an overall decline on cognitive flexibility.

  7. A Methodology for Constructing Marginal Abatement Cost Curves for Climate Action in Cities

    Directory of Open Access Journals (Sweden)

    Nadine Ibrahim

    2016-03-01

    Full Text Available As drivers of climate action, cities are taking measures to reduce greenhouse gas (GHG emissions, which if left unabated pose a challenge to meeting long-term climate targets. The economics of climate action needs to be at the forefront of climate dialogue to prioritize investments among competing mitigation measures. A marginal abatement cost (MAC curve is an effective visualization of climate action that initiates a technical and economic discussion of the cost-effectiveness and abatement potential of such actions among local leaders, policy makers, and climate experts. More commonly demonstrated for countries, MAC curves need to be developed for cities because of their heterogeneity, which vary in their urban activities, energy supply, infrastructure stock, and commuting patterns. The methodology for constructing bottom-up MAC curves for cities is presented for technologies that offer fuel switching and/or energy efficiencies, while considering technology lifetimes, city-specific electricity and fuel prices, and emission intensities. Resulting MAC curves are unique to every city, and chart the pathway towards low-carbon growth by prioritizing measures based on cost-effectiveness. A case study of Toronto’s climate targets demonstrates the prioritization of select technologies. Leveraging MAC curves to support climate programs enables cities to strategically invest in financing climate action and designing incentives.

  8. Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM

    Directory of Open Access Journals (Sweden)

    Igor Peško

    2017-01-01

    Full Text Available Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer’s precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs and support vector machines (SVM are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.

  9. Statistically Controlling for Confounding Constructs Is Harder than You Think.

    Directory of Open Access Journals (Sweden)

    Jacob Westfall

    Full Text Available Social scientists often seek to demonstrate that a construct has incremental validity over and above other related constructs. However, these claims are typically supported by measurement-level models that fail to consider the effects of measurement (unreliability. We use intuitive examples, Monte Carlo simulations, and a novel analytical framework to demonstrate that common strategies for establishing incremental construct validity using multiple regression analysis exhibit extremely high Type I error rates under parameter regimes common in many psychological domains. Counterintuitively, we find that error rates are highest--in some cases approaching 100%--when sample sizes are large and reliability is moderate. Our findings suggest that a potentially large proportion of incremental validity claims made in the literature are spurious. We present a web application (http://jakewestfall.org/ivy/ that readers can use to explore the statistical properties of these and other incremental validity arguments. We conclude by reviewing SEM-based statistical approaches that appropriately control the Type I error rate when attempting to establish incremental validity.

  10. FFTF constructibility

    International Nuclear Information System (INIS)

    Weber, S.A.; Hulbert, D.I.

    1975-01-01

    The influence of the design criteria on the constructibility of the Fast Flux Test Facility is described. Specifically, the effects of requirements due to maintenance accessibility, inerting of cells, seismicity, codes, and standards are addressed. The design and construction techniques developed to minimize the impact of the design criteria on cost and schedule are presented with particular emphasis on the cleanliness and humidity controls imposed during construction of the sodium systems. (U.S.)

  11. Minimizing communication cost among distributed controllers in software defined networks

    Science.gov (United States)

    Arlimatti, Shivaleela; Elbreiki, Walid; Hassan, Suhaidi; Habbal, Adib; Elshaikh, Mohamed

    2016-08-01

    Software Defined Networking (SDN) is a new paradigm to increase the flexibility of today's network by promising for a programmable network. The fundamental idea behind this new architecture is to simplify network complexity by decoupling control plane and data plane of the network devices, and by making the control plane centralized. Recently controllers have distributed to solve the problem of single point of failure, and to increase scalability and flexibility during workload distribution. Even though, controllers are flexible and scalable to accommodate more number of network switches, yet the problem of intercommunication cost between distributed controllers is still challenging issue in the Software Defined Network environment. This paper, aims to fill the gap by proposing a new mechanism, which minimizes intercommunication cost with graph partitioning algorithm, an NP hard problem. The methodology proposed in this paper is, swapping of network elements between controller domains to minimize communication cost by calculating communication gain. The swapping of elements minimizes inter and intra communication cost among network domains. We validate our work with the OMNeT++ simulation environment tool. Simulation results show that the proposed mechanism minimizes the inter domain communication cost among controllers compared to traditional distributed controllers.

  12. Cost of microbial larviciding for malaria control in rural Tanzania.

    Science.gov (United States)

    Rahman, Rifat; Lesser, Adriane; Mboera, Leonard; Kramer, Randall

    2016-11-01

    Microbial larviciding may be a potential supplement to conventional malaria vector control measures, but scant information on its relative implementation costs and effectiveness, especially in rural areas, is an impediment to expanding its uptake. We perform a costing analysis of a seasonal microbial larviciding programme in rural Tanzania. We evaluated the financial and economic costs from the perspective of the public provider of a 3-month, community-based larviciding intervention implemented in twelve villages in the Mvomero District of Tanzania in 2012-2013. Cost data were collected from financial reports and invoices and through discussion with programme administrators. Sensitivity analysis explored the robustness of our results to varying key parameters. Over the 2-year study period, approximately 6873 breeding sites were treated with larvicide. The average annual economic costs of the larviciding intervention in rural Tanzania are estimated at 2014 US$ 1.44 per person protected per year (pppy), US$ 6.18 per household and US$ 4481.88 per village, with the larvicide and staffing accounting for 14% and 58% of total costs, respectively. We found the costs pppy of implementing a seasonal larviciding programme in rural Tanzania to be comparable to the costs of other larviciding programmes in urban Tanzania and rural Kenya. Further research should evaluate the cost-effectiveness of larviciding relative to, and in combination with, other vector control strategies in rural settings. © 2016 John Wiley & Sons Ltd.

  13. Cost of and soil loss on "minimum-standard" forest truck roads constructed in the central Appalachians

    Science.gov (United States)

    J. N. Kochenderfer; G. W. Wendel; H. Clay Smith

    1984-01-01

    A "minimum-standard" forest truck road that provides efficient and environmentally acceptable access for several forest activities is described. Cost data are presented for eight of these roads constructed in the central Appalachians. The average cost per mile excluding gravel was $8,119. The range was $5,048 to $14,424. Soil loss was measured from several...

  14. Low-Cost Servomotor Driver for PFM Control.

    Science.gov (United States)

    Aragon-Jurado, David; Morgado-Estevez, Arturo; Perez-Peña, Fernando

    2017-12-31

    Servomotors have already been around for some decades and they are extremely popular among roboticists due to their simple control technique, reliability and low-cost. They are usually controlled by using Pulse Width Modulation (PWM) and this paper aims to keep the idea of simplicity and low-cost, while introducing a new control technique: Pulse Frequency Modulation (PFM). The objective of this paper is to focus on our development of a low-cost servomotor controller which will allow the research community to use them with PFM. A low-cost commercial servomotor is used as the base system for the development: a small PCB that fits inside the case and allocates all the electronic components to control the motor has been designed to replace the original. The potentiometer is retained as the feedback sensor and a microcontroller is responsible for controlling the position of the motor. The paper compares the performance of a PWM and a PFM controlled servomotor. The comparison shows that the servomotor with our controller achieves a faster mechanism for switching targets and a lower latency. This controller can be used with neuromorphic systems to remove the conversion from events to PWM.

  15. Making Hay When It Rains: The Effect Prevailing Wage Regulations, Scale Economies, Seasonal, Cyclical and Local Business Patterns Have On School Construction Costs.

    Science.gov (United States)

    Azari-Rad, Hamid; Philips, Peter; Prus, Mark

    2002-01-01

    Examines several alternative ways for school districts to reduce the construction costs of new facilities. Finds that spacing out the start of facility construction projects and building during economic downturns in the construction industry offer the best options for construction cost savings. (PKP)

  16. Biomass Combustion Control and Stabilization Using Low-Cost Sensors

    Directory of Open Access Journals (Sweden)

    Ján Piteľ

    2013-01-01

    Full Text Available The paper describes methods for biomass combustion process control and burning stabilization based on low-cost sensing of carbon monoxide emissions and oxygen concentration in the flue gas. The designed control system was tested on medium-scale biomass-fired boilers and some results are evaluated and presented in the paper.

  17. Costs of rodent control in pine regeneration in California

    Science.gov (United States)

    Richard D. Cosens; David Tackle

    1950-01-01

    The control of seed-eating rodents, combined with the proper method of cutting and site preparation, appears essential to get the maximum results of natural seeding of pine. One method of control is by treating the area to be regenerated with lethal bait prior to seedfall. This note describes such a method and costs of treatment for the westside and eastside Sierran...

  18. Adaptive Incentive Controls for Stackelberg Games with Unknown Cost Functionals.

    Science.gov (United States)

    1984-01-01

    APR EZT:: F I AN 73S e OsL:-: UNCLASSI?:-- Q4~.’~- .A.., 6, *~*i i~~*~~*.- U ADAPTIVE INCENTIVE CONTROLS FOR STACKELBERG GAMES WITH UNKNOWN COST...AD-A161 885 ADAPTIVE INCENTIVE CONTROLS FOR STACKELBERG GAMES WITH i/1 UNKNOWN COST FUNCTIONALSCU) ILLINOIS UNIV AT URBANA DECISION AND CONTROL LAB T...ORGANIZATION 6b. OFFICE SYMBOL 7.. NAME OF MONITORING ORGANIZATION CoriaeLcenef~pda~ Joint Services Electronics Program Laboratory, Univ. of Illinois N/A

  19. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  20. The influence of management and construction methods in the repair costs of Spain’s low-volume road network

    Directory of Open Access Journals (Sweden)

    Eutiquio Gallego

    2016-06-01

    Full Text Available This paper describes the entire process of the implementation of the Spanish low volume road network, including the design criteria, the construction techniques and the management policies during all the periods. The current situation of low volume roads in Spain was analyzed with respect to the legal framework and their actual condition. In addition, the budget required for the repair of 41 low volume roads throughout Spain was calculated in order to statistically analyze the influence of the pavement materials and the period of construction. The main conclusions were that low volume roads constructed during the 1970´s are currently those in the best state of repair and those requiring the lower repair costs, even lower than those constructed after 1980´s. In addition, low volume roads constructed with higher quality materials and using standardized techniques required five times lower repair costs than those made of lower quality materials.

  1. Construction delays causing risks on time and cost - a critical review

    Directory of Open Access Journals (Sweden)

    Chidambaram Ramanathan

    2012-02-01

    Full Text Available There is an increase in the number of construction projects experiencing extensive delays leading to exceeding initial time and cost budget.  This paper reviews 41 studies around the world which surveyed the delay factors and classified them into Groups.  The main purpose of this paper is to review literature, each of which have categorized the causes that are responsible for time delays and cost overrun in projects. The collected list has 113 causes for delays categorized in to 18 different groups.  Most of the researches have analysed the responses from the Questionnaire survey.    The collected data are used to rank the problem.  The data are further used to investigate and analyse Important Index, Frequency Index, Severity Index, Relative Important Index, Relative Importance Weight, Weighted Average, Mean, Standard Deviation and Variance.  The collective comparison has revealed that the ranking given by all the researchers is not the same.  Further each and every study has different rank ratings for the different group of the delays.  This review paper attempts to provide an updated compilation of the earlier studies on ranking of the delay causers, which are never similar and constant for universal projects.  It is concluded that a separate study is required for identifying the factors causing delay for projects operated in Sabah, East Malaysia.

  2. The construction and operation of a low-cost poultry waste digester.

    Science.gov (United States)

    Steinsberger, S C; Shih, J C

    1984-05-01

    A simple and low-cost poultry waste digester (PWD) was constructed to treat the waste from 4000 caged laying hens on University Research Unit No. 2 at North Carolina State University. The system was built basically of a plastic lining with insulation, a heating system, a hot-water tank, and other metering equipment. It was operated at 50 degrees C and pH 7.5-8.0. The initiation of methane production was achieved using the indigenous microflora in the poultry waste. At an optimal loading rate (7.5 kg volatile solids/m(3) day), the PWD produced biogas (55% methane) at a rate of 4.0 m(3)/m(3) day. The PWD was biologically stable and able to tolerate temporary overloads and shutdowns. A higher loading rate failed to maintain a high gas production rate and caused drops in methane content and pH value. Under optimal conditions, a positive energy balance was demonstrated with a net surplus of 50.6% of the gross energy. For methane production, the PWD system was proved to be technically feasible. The simple design and inexpensive materials used for this model could significantly reduce the cost of digestion compared to more conventional systems. More studies are needed to determine the durability, the required maintenance of the system, and the most economical method of biogas and solid residue utilization.

  3. Applied Research of Enterprise Cost Control Based on Linear Programming

    Directory of Open Access Journals (Sweden)

    Yu Shuo

    2015-01-01

    This paper researches the enterprise cost control through the linear programming model, and analyzes the restriction factors of the labor of enterprise production, raw materials, processing equipment, sales price, and other factors affecting the enterprise income, so as to obtain an enterprise cost control model based on the linear programming. This model can calculate rational production mode in the case of limited resources, and acquire optimal enterprise income. The production guiding program and scheduling arrangement of the enterprise can be obtained through calculation results, so as to provide scientific and effective guidance for the enterprise production. This paper adds the sensitivity analysis in the linear programming model, so as to learn about the stability of the enterprise cost control model based on linear programming through the sensitivity analysis, and verify the rationality of the model, and indicate the direction for the enterprise cost control. The calculation results of the model can provide a certain reference for the enterprise planning in the market economy environment, which have strong reference and practical significance in terms of the enterprise cost control.

  4. Taxing behavioral control diminishes sharing and costly punishment in childhood.

    Science.gov (United States)

    Steinbeis, Nikolaus

    2018-01-01

    Instances of altruism in children are well documented. However, the underlying mechanisms of such altruistic behavior are still under considerable debate. While some claim that altruistic acts occur automatically and spontaneously, others argue that they require behavioral control. This study focuses on the mechanisms that give rise to prosocial decisions such as sharing and costly punishment. In two studies it is shown in 124 children aged 6-9 years that behavioral control plays a critical role for both prosocial decisions and costly punishment. Specifically, the studies assess the influence of taxing aspects of self-regulation, such as behavioral control (Study 1) and emotion regulation (Study 2) on subsequent decisions in a Dictator and an Ultimatum Game. Further, children's perception of fairness norms and emotional experience were measured. Taxing children's behavioral control prior to making their decisions reduced sharing and costly punishment of unfair offers, without changing perception of fairness norms or the emotional experience. Conversely, taxing children's emotion regulation prior to making their decisions only led to increased experience of anger at seeing unfair offers, but left sharing, costly punishment and the perception of fairness norms unchanged. These findings stress the critical role of behavioral control in prosocial giving and costly punishment in childhood. © 2016 John Wiley & Sons Ltd.

  5. Long Term Cost Efficiency through Green Management Control Systems

    OpenAIRE

    Vukania Adda, Nancy; Qin, Xiaochen

    2012-01-01

    Title: Long term cost efficiency through green management control systems.Authors: Nancy Vukania &Xiaochen QinSupervisor: Åsa Karin-EngstrandBackground: The worldwide financial crisis of 2008 has reconfigured the economic turf leading to a more uncertain and turbulent playing field – a greater challenge for business strategy and the quest for optimization- The oil price hike of 2008 (Furlong 2010)1 caused its rippling effect to affect various cost categories including energy, labor and lo...

  6. Emission Control Cost-Effectiveness of Alternative-Fuel Vehicles

    OpenAIRE

    Wang, Quanlu; Sperling, Daniel; Olmstead, Janis

    1993-01-01

    Although various legislation and regulations have been adopted to promote the use of alternative-fuel vehicles for curbing urban air pollution problems, there is a lack of systematic comparisons of emission control cost-effectiveness among various alternative-fuel vehicle types. In this paper, life-cycle emission reductions and life-cycle costs were estimated for passenger cars fueled with methanol, ethanol, liquified petroleum gas, compressed natural gas, and electricity. Vehicle emission es...

  7. Numerical Construction of Viable Sets for Autonomous Conflict Control Systems

    Directory of Open Access Journals (Sweden)

    Nikolai Botkin

    2014-04-01

    Full Text Available A conflict control system with state constraints is under consideration. A method for finding viability kernels (the largest subsets of state constraints where the system can be confined is proposed. The method is related to differential games theory essentially developed by N. N. Krasovskii and A. I. Subbotin. The viability kernel is constructed as the limit of sets generated by a Pontryagin-like backward procedure. This method is implemented in the framework of a level set technique based on the computation of limiting viscosity solutions of an appropriate Hamilton–Jacobi equation. To fulfill this, the authors adapt their numerical methods formerly developed for solving time-dependent Hamilton–Jacobi equations arising from problems with state constraints. Examples of computing viability sets are given.

  8. Low cost valves motorization using micro controller; Motorizacion de valvulas de bajo coste mediante microcontrolador

    Energy Technology Data Exchange (ETDEWEB)

    Menendez, A.; Leal, M. A.; Dominguez Ademe, G.; Yaglian, E.

    2004-07-01

    This article describes a new solution for valves motorization with the objective to obtain a minimum cost and a minimum size. With it, it is proposed to facilitate the complex applications of automation in the hydraulic sector, with multiple volume and pressure controls, like the one made on Integrated Digital Control of Desalting Water Plants. The design presented here consists basically of an original mechanical connection that allows to use standard market valves and moto-gearboxes and a simplified electronic controller based on a micro controller with an elaborated software that allows to control the mother either in ON/Off (open/close) applications or in incremental applications of Regulation. (Author)

  9. Quality of neurological care. Balancing cost control and ethics.

    Science.gov (United States)

    Bernat, J L

    1997-11-01

    As the quality of neurological care becomes a mutual objective of physicians, patients, and health planners, increased demands on cost savings will create conflicts that could threaten the ethical basis of medical practice. Physicians will see increasing ethical conflicts between their fiduciary duties to make treatment decisions in the best interest of their patients and their justice-based duties to conserve societal resources. These conflicts can be best mitigated if physicians maintain their orientation as patient advocates but practice cost-conscious clinical behaviors that consider the cost-effectiveness of tests and treatments and do not squander society's finite resources by ordering medical tests and treatments of zero or marginal utility. Health system planners should resolve their conflicting objectives of quality and cost control by rigorously defining and measuring quality through physician leadership and by implementing cost-control measures that enhance the quality of medical care. Managed care organizations voluntarily should forsake financially successful but blatantly unethical cost-saving schemes, such as gag clauses and end-of-year kickback payments to physicians, because these schemes diminish patients' trust in physicians and degrade the integrity of the patient-physician relationship. State and federal laws should prudently regulate these unethical cost-saving schemes to the same extent as they have for the harmful conflicts in fee-for-service medicine.

  10. Cost Control Guide For Decommissioning Of Nuclear Installations

    International Nuclear Information System (INIS)

    2013-01-01

    This cost control guide was prepared in response to the request from the OECD/NEA Working Party on Decommissioning and Dismantling (WPDD) - Decommissioning Cost Estimation Group (DCEG) to offer the industry guidance in preparing and implementing cost and schedule controls during decommissioning. The DCEG sent out a survey questionnaire in 2010 soliciting comments from OECD member states on their use of cost controls during decommissioning. While the response was limited, the consensus was to proceed with the preparation of this guide. Cost and schedule control systems have been in use for more than 30 years, and in the last 10 years or so have evolved into a more formalised earned value management system (EVMS). This guide is based on the internationally recognised standard, Earned Value Management Systems (ANSI, 2007). The EVMS is built on a work breakdown structure (WBS) of decommissioning activities, and a defined process for controlling a project. The EVMS not only provides measurement of project status and future performance, but also builds a structure and culture for accountability on project performance. This guide describes the performance metrics used to determine the value earned based on what was planned to be done, what was actually accomplished and what it actually cost. Variances measured monthly at a minimum indicate where potential problems are arising and raise a flag for the project manager to implement corrective actions for the next reporting period. The success of the EVMS programme depends on management commitment to implement a culture change for its employees, and to impose the EVMS on potential future contractors performing decommissioning work at a facility. Formal training is required to ensure all elements of the process are understood and put into action. It is recommended to begin with a small project, and graduate to larger projects as the staff learns how to use the system. The EVMS process has been used internationally for small

  11. Guaranteed cost control of time-delay chaotic systems

    International Nuclear Information System (INIS)

    Park, Ju H.; Kwon, O.M.

    2006-01-01

    This article studies a guaranteed cost control problem for a class of time-delay chaotic systems. Attention is focused on the design of memory state feedback controllers such that the resulting closed-loop system is asymptotically stable and an adequate level of performance is also guaranteed. Using the Lyapunov method and LMI (linear matrix inequality) framework, two criteria for the existence of the controller are derived in terms of LMIs. A numerical example is given to illustrate the proposed method

  12. Optimizing the construction of devices to control inaccesible surfaces - case study

    Science.gov (United States)

    Niţu, E. L.; Costea, A.; Iordache, M. D.; Rizea, A. D.; Babă, Al

    2017-10-01

    The modern concept for the evolution of manufacturing systems requires multi-criteria optimization of technological processes and equipments, prioritizing associated criteria according to their importance. Technological preparation of the manufacturing can be developed, depending on the volume of production, to the limit of favourable economical effects related to the recovery of the costs for the design and execution of the technological equipment. Devices, as subsystems of the technological system, in the general context of modernization and diversification of machines, tools, semi-finished products and drives, are made in a multitude of constructive variants, which in many cases do not allow their identification, study and improvement. This paper presents a case study in which the multi-criteria analysis of some structures, based on a general optimization method, of novelty character, is used in order to determine the optimal construction variant of a control device. The rational construction of the control device confirms that the optimization method and the proposed calculation methods are correct and determine a different system configuration, new features and functions, and a specific method of working to control inaccessible surfaces.

  13. Accounting and cost control of a nuclear power station

    International Nuclear Information System (INIS)

    Dangelmaier, P.

    1977-01-01

    1) chart or classification of accounts, 2) all plant expenses, 3) cost control, 4) storage of spare parts and supplies, 5) control of applicable dose rate, 6) charges for insurance. The accuracy of accounting and cost control is a primary thing for the efficiency in a nuclear power station. The much more important factor is the availability. It is necessary to save costs by a more effective storage or a more detailed and automatic process of single jobs in the workshop. But a very definite experience made in Obrigheim is the fact that not only commercial people know which financial loss will occur if the plant is out of operation one hour. This knowledge is also important for the technical people and for the workers in the workshops. The technical responsibility and the security in operation of the plant and the commercial understanding for the risk of non-availability do not exclude each other. (HP) [de

  14. Control and Effort Costs Influence the Motivational Consequences of Choice

    Directory of Open Access Journals (Sweden)

    Holly Sullivan-Toole

    2017-05-01

    Full Text Available The act of making a choice, apart from any outcomes the choice may yield, has, paradoxically, been linked to both the enhancement and the detriment of intrinsic motivation. Research has implicated two factors in potentially mediating these contradictory effects: the personal control conferred by a choice and the costs associated with a choice. Across four experiments, utilizing a physical effort task disguised as a simple video game, we systematically varied costs across two levels of physical effort requirements (Low-Requirement, High-Requirement and control over effort costs across three levels of choice (Free-Choice, Restricted-Choice, and No-Choice to disambiguate how these factors affect the motivational consequences of choosing within an effortful task. Together, our results indicated that, in the face of effort requirements, illusory control alone may not sufficiently enhance perceptions of personal control to boost intrinsic motivation; rather, the experience of actual control may be necessary to overcome effort costs and elevate performance. Additionally, we demonstrated that conditions of illusory control, while otherwise unmotivating, can through association with the experience of free-choice, be transformed to have a positive effect on motivation.

  15. Relevant Costs for Decision in an Effective Controlling System

    Directory of Open Access Journals (Sweden)

    Mihaela TULVINSCHI

    2010-05-01

    Full Text Available Controlling is considered a leading concept in the sense of coordination, planning, control and automation, in order to produce the synthesis necessary in decision making. The purpose of article is to highlight the link between a dynamic accounting system and an effective controlling system. The research method used is based on the idea that the cost analysis in an efficient controlling system involves obtaining accounting information from within the entity which management then uses in decision making. In conclusion, we emphasize that an effective controlling system must provide managers the tools to meet their informational needs.

  16. Impact of air pollution control costs on the cost and spatial arrangement of cellulosic biofuel production in the U.S.

    Science.gov (United States)

    Murphy, Colin W; Parker, Nathan C

    2014-02-18

    Air pollution emissions regulation can affect the location, size, and technology choice of potential biofuel production facilities. Difficulty in obtaining air pollutant emission permits and the cost of air pollution control devices have been cited by some fuel producers as barriers to development. This paper expands on the Geospatial Bioenergy Systems Model (GBSM) to evaluate the effect of air pollution control costs on the availability, cost, and distribution of U.S. biofuel production by subjecting potential facility locations within U.S. Clean Air Act nonattainment areas, which exceed thresholds for healthy air quality, to additional costs. This paper compares three scenarios: one with air quality costs included, one without air quality costs, and one in which conversion facilities were prohibited in Clean Air Act nonattainment areas. While air quality regulation may substantially affect local decisions regarding siting or technology choices, their effect on the system as a whole is small. Most biofuel facilities are expected to be sited near to feedstock supplies, which are seldom in nonattainment areas. The average cost per unit of produced energy is less than 1% higher in the scenarios with air quality compliance costs than in scenarios without such costs. When facility construction is prohibited in nonattainment areas, the costs increase by slightly over 1%, due to increases in the distance feedstock is transported to facilities in attainment areas.

  17. The evaluation of a hostel ward. A controlled study using modified cost-benefit analysis.

    Science.gov (United States)

    Hyde, C; Bridges, K; Goldberg, D; Lowson, K; Sterling, C; Faragher, B

    1987-12-01

    A controlled modified cost-benefit evaluation of a hostel ward caring for new long-stay patients is described and results are presented for the first two years. In some respects the residents of the hostel ward had fewer psychotic impairments than those remaining on the wards of the district general hospital, mainly because the latter seem to continue to acquire such defects, while the former have remained relatively unchanged. The hostel ward residents also develop superior domestic skills, use more facilities in the community, and are more likely to be engaged in constructive activities than controls. These advantages were not purchased at a price, since the cost of providing this form of care for these patients has cost less than care provided by the district general hospital.

  18. The construction of control chart for PM10 functional data

    Science.gov (United States)

    Shaadan, Norshahida; Jemain, Abdul Aziz; Deni, Sayang Mohd

    2014-06-01

    In this paper, a statistical procedure to construct a control chart for monitoring air quality (PM10) using functional data is proposed. A set of daily indices that represent the daily PM10 curves were obtained using Functional Principal Component Analysis (FPCA). By means of an iterative charting procedure, a reference data set that represented a stable PM10 process was obtained. The data were then used as a reference for monitoring future data. The application of the procedure was conducted using seven-year (2004-2010) period of recorded data from the Klang air quality monitoring station located in the Klang Valley region of Peninsular Malaysia. The study showed that the control chart provided a useful visualization tool for monitoring air quality and was capable in detecting abnormality in the process system. As in the case of Klang station, the results showed that with reference to 2004-2008, the air quality (PM10) in 2010 was better than that in 2009.

  19. Dynamic environmental control mechanisms for pneumatic foil constructions

    Science.gov (United States)

    Flor, Jan-Frederik; Wu, Yupeng; Beccarelli, Paolo; Chilton, John

    2017-11-01

    Membrane and foil structures have become over the last decades an attractive alternative to conventional materials and building systems with increasing implementation in different typologies and scale. The development of transparent, light, flexible and resistant materials like Ethylene Tetrafluoroethylene (ETFE) has triggered a rethinking of the building envelope in the building industry towards lightweight systems. ETFE foil cushions have proven to fulfil the design requirements in terms of structural efficiency and aesthetic values. But the strategies to satisfy increasing demands of energy efficiency and comfort conditions are still under development. The prediction and manipulation of the thermo-optical behaviour of ETFE foil cushion structures currently remain as one of the main challenges for designers and manufacturers. This paper reviews ongoing research regarding the control of the thermo-optical performance of ETFE cushion structures and highlights challenges and possible improvements. An overview of different dynamic and responsive environmental control mechanisms for multilayer foil constructions is provided and the state of the art in building application outlined by the discussion of case studies.

  20. Constructibility Challenges for Perimeter Control Blasting and Slope Development in Shale and Other "Weak" Rocks

    Science.gov (United States)

    Scarpato, D. J.

    2016-02-01

    Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed for; however, all too frequently, such challenges manifest themselves as "surprises" in the field. Common constructibility challenges can include drill hole deviation during drilling for controlled blasting; and, excavation slope instability arising from inconsistent perimeter control drilling. Drill hole deviation results from the cumulative effects from both drilling mechanics and rock mass conditions. Once a hole has initiated the deviation trajectory, it is difficult to rectify drill steel position. Although such challenges are not necessarily unique to shale, they are often exacerbated by weak, weathered and transversely isotropic nature of bedrock conditions. All too often, the working assumption is that shale is "soft" and easily excavatable; however, this blanket assumption can prove to be costly. This paper is intended to provide design professionals and contractors with the practical considerations needed to avoid the "surprises" associated with drill hole deviation, and minimize the potential for costly claims.

  1. Controlling fuel costs: Procurement strategies and regulatory standards

    International Nuclear Information System (INIS)

    Einhorn, H.A.; Levi, B.I.

    1992-01-01

    Since the oil price shocks and inflation of the 1970s, regulatory authorities and utilities have devoted considerable attention to controlling energy costs while maintaining reliable service. Although much of this concern has been directed towards capital cost containment, increasing scrutiny has been applied to a broad range of variable costs, especially to fuel procurement expenditures. With some 40% to 65% of the electric utility industry's annual operation and maintenance expenses paid to secure fuel supplies, even a small difference in fuel costs could have a substantial impact on costs to ratepayers. This increased attention to fuel cost containment can be expected to intensify as implementation of the 1990 amendments to the Clean Air Act affects fuel purchase decisions. To assure that fuel is purchased in a responsible and cost-effective manner, some state jurisdictions have initiated periodic reviews (audits) of the procurement practices that electric utilities follow when purchasing fuel. While a utility must demonstrate how it purchases fuel, there is wide variation in interest and scope of audits among jurisdictions. In this paper, the authors review: (1) the regulatory environment within which fuel procurement and audits occur, and (2) some particularly controversial issues that will receive increasing attention as the practice of conducting fuel procurement audits spreads

  2. Cost Effectiveness Analysis of Optimal Malaria Control Strategies in Kenya

    Directory of Open Access Journals (Sweden)

    Gabriel Otieno

    2016-03-01

    Full Text Available Malaria remains a leading cause of mortality and morbidity among the children under five and pregnant women in sub-Saharan Africa, but it is preventable and controllable provided current recommended interventions are properly implemented. Better utilization of malaria intervention strategies will ensure the gain for the value for money and producing health improvements in the most cost effective way. The purpose of the value for money drive is to develop a better understanding (and better articulation of costs and results so that more informed, evidence-based choices could be made. Cost effectiveness analysis is carried out to inform decision makers on how to determine where to allocate resources for malaria interventions. This study carries out cost effective analysis of one or all possible combinations of the optimal malaria control strategies (Insecticide Treated Bednets—ITNs, Treatment, Indoor Residual Spray—IRS and Intermittent Preventive Treatment for Pregnant Women—IPTp for the four different transmission settings in order to assess the extent to which the intervention strategies are beneficial and cost effective. For the four different transmission settings in Kenya the optimal solution for the 15 strategies and their associated effectiveness are computed. Cost-effective analysis using Incremental Cost Effectiveness Ratio (ICER was done after ranking the strategies in order of the increasing effectiveness (total infections averted. The findings shows that for the endemic regions the combination of ITNs, IRS, and IPTp was the most cost-effective of all the combined strategies developed in this study for malaria disease control and prevention; for the epidemic prone areas is the combination of the treatment and IRS; for seasonal areas is the use of ITNs plus treatment; and for the low risk areas is the use of treatment only. Malaria transmission in Kenya can be minimized through tailor-made intervention strategies for malaria control

  3. Monitoring with new microprocessor cuts cost of control system

    Energy Technology Data Exchange (ETDEWEB)

    Maehling, K L

    1985-08-01

    Programmable logic controllers (PLC) were originally developed as an alternative to relays, counters and timers for sequential and interlock control systems. They are now also used as part of distributive control systems which include diagnostic monitoring functions. The paper describes how a wiring scheme can be simplified and installation costs reduced by incorporating a newly-developed microprocessor-based monitoring device as an interface between remote devices and a PLC. An industrial application, the 400 tph coal handling facility at Bowater Southern Paper Co's mill in Calhoun, Tennessee, is considered. The control system design is outlined, the micro-monitor is described and the benefits of simplicity are stated in the paper.

  4. Method for Controlling Space Transportation System Life Cycle Costs

    Science.gov (United States)

    McCleskey, Carey M.; Bartine, David E.

    2006-01-01

    A structured, disciplined methodology is required to control major cost-influencing metrics of space transportation systems during design and continuing through the test and operations phases. This paper proposes controlling key space system design metrics that specifically influence life cycle costs. These are inclusive of flight and ground operations, test, and manufacturing and infrastructure. The proposed technique builds on today's configuration and mass properties control techniques and takes on all the characteristics of a classical control system. While the paper does not lay out a complete math model, key elements of the proposed methodology are explored and explained with both historical and contemporary examples. Finally, the paper encourages modular design approaches and technology investments compatible with the proposed method.

  5. Control and operation cost optimization of the HISS cryogenic system

    International Nuclear Information System (INIS)

    Porter, J.; Anderson, D.; Bieser, F.

    1984-01-01

    This chapter describes a control strategy for the Heavy Ion Spectrometer System (HISS), which relies upon superconducting coils of cryostable design to provide a particle bending field of 3 tesla. The control strategy has allowed full time unattended operation and significant operating cost reductions. Microprocessor control of flash boiling style LIN circuits has been successful. It is determined that the overall operating cost of most cryogenic systems using closed loop helium systems can be minimized by properly balancing the total heat load between the helium and nitrogen circuits to take advantage of the non-linearity which exists in the power input to 4K refrigeration characteristic. Variable throughput compressors have the advantage of turndown capability at steady state. It is concluded that a hybrid system using digital and analog input for control, data display and alarms enables full time unattended operation

  6. Cost effectiveness of tobacco control policies in Vietnam: the case of population-level interventions.

    Science.gov (United States)

    Higashi, Hideki; Truong, Khoa D; Barendregt, Jan J; Nguyen, Phuong K; Vuong, Mai L; Nguyen, Thuy T; Hoang, Phuong T; Wallace, Angela L; Tran, Tien V; Le, Cuong Q; Doran, Christopher M

    2011-05-01

    Tobacco smoking is one of the leading public health problems in the world. It is also possible to prevent and/or reduce the harm from tobacco use through the use of cost-effective tobacco control measures. However, most of this evidence comes from developed countries and little research has been conducted on this issue in developing countries. The objective of this study was to analyse the cost effectiveness of four population-level tobacco control interventions in Vietnam. Four tobacco control interventions were evaluated: excise tax increase; graphic warning labels on cigarette packs; mass media campaigns; and smoking bans (in public or in work places). A multi-state life table model was constructed in Microsoft® Excel to examine the cost effectiveness of the tobacco control intervention options. A government perspective was adopted, with costing conducted using a bottom-up approach. Health improvement was considered in terms of disability-adjusted life-years (DALYs) averted. All assumptions were subject to sensitivity and uncertainty analysis. All the interventions fell within the definition of being very cost effective according to the threshold level suggested by the WHO (i.e. place smoking bans. If the cost offset was included in the analysis, all interventions would provide cost savings to the government health sector. All four interventions to reduce the harm from tobacco use appear to be highly cost effective and should be considered as priorities in the context of Vietnam. The government may initially consider graphic warning labels and tax increase, followed by other interventions.

  7. Pharmaceuticals: pharmaceutical cost controls--2005. End of Year Issue Brief.

    Science.gov (United States)

    Seay, Melicia; Varma, Priya

    2005-12-31

    The enactment of the Omnibus Budget Reconciliation Act of 1990 (OBRA '90) gave states the option of offering pharmaceutical benefits within their Medicaid programs. But the law placed restrictions on states' flexibility to control what prescriptions they would cover and required the states to reimburse outpatient prescription drugs from manufacturers that signed rebate agreements with the U.S. Department of Health and Human Services. Forty-nine states--Arizona is excluded, based on its program structure--and the District of Columbia currently offer prescription drug coverage under the Medicaid Drug Rebate Program. During the past four years, states all over the country have been plagued with revenue shortfalls in their state Medicaid budgets. While the fiscal situation improved for most states in the 2004 legislative session, many states still face budget pressures in 2005. Compounding existing budget pressures are threats from the Bush Administration to shift increased costs of the Medicaid program on to the states. All things considered, the economic pressure of funding Medicaid is at the top of legislative agendas in 2005. As in previous years, states are attempting to reduce costs to their Medicaid programs by seeking savings in their pharmaceutical programs. Prescription drug costs are highly attributed as a contributing factor to the fiscal climate of state Medicaid programs. Currently, prescription drug spending outpaces that of every other category of health care and drug prices are rising faster than inflation. In response, states are instituting a variety of pharmaceutical cost control measures such as creating preferred drug lists (PDLs), negotiating supplemental rebates, forming bulk purchasing pools, promoting generic drug substitution and implementing price controls. As prescription drug cost containment tools have gained acceptance and momentum, they continue to be controversial. This issue brief explores the debate, history, methodology, utilization

  8. Internal cost control on the ecological quality of products

    Directory of Open Access Journals (Sweden)

    N.P. Syroid

    2018-04-01

    Full Text Available To improve the environmental quality of products due attention should be paid to control the processes related to environmental quality input of the product. The results of the study help to state the purpose and objectives of the control, also to define objects for internal control of operations cost of environmental quality. So, we believe that the main purpose of internal cost control on the ecological quality of products is the establishment of the correctness and legality of business operations, prevention of violations and abuses in the expenditure of natural, labour, material and financial resources to ensure the minimization of negative impact on the health of consumers and the environment. The basic objectives of internal control of expenditure are brought forward, but it should be noted that they can vary and depend on the size, structure, spheres and types of economic activity of the enterprise, the requirements of management personnel. In the process of identifying the objects of control of environmental quality it should be noted that this list is not exhaustive, but it is most relevant to highlight objects such as genetically modified organisms and waste production. Also the subjects of cost control to environmental quality, their functions and the information base for monitoring are determined. Proper organization of the process of internal cost control on the ecological quality of products would benefit from a clear documentation of transactions, timely and complete registration of accounting data in the registers, the true reflection of information in managerial financial reporting and ensure reduction of the negative impact on the health of consumers and the environment.

  9. Controlling Special Education Costs at the School District Level.

    Science.gov (United States)

    Morgan, W. Daniel

    1992-01-01

    Describes the financing of a New York school district for emotionally disturbed children. Summarizes suggestions for controlling special education costs at the district level obtained from a nationwide sample of school business officials. Among the suggestions offered are to include a review of private placements and an annual caseload review,…

  10. Cost-effectiveness of controlling Salmonella in the pork chain

    NARCIS (Netherlands)

    Gaag, van der M.A.; Saatkamp, H.W.; Backus, G.B.C.; Beek, van P.; Huirne, R.B.M.

    2004-01-01

    Pork is one of the sources of food-borne salmonellosis in humans. In this paper, the cost-effectiveness of different control scenarios against Salmonella in the stages finishing, transport, lairage and slaughtering is explored. A stochastic simulation model was used for the epidemiological analysis

  11. AN ASSESSMENT OF FACTORS AFFECTING MATERIAL STOCK CONTROL PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA

    OpenAIRE

    Adafin, Johnson Kayode; Ayodele, Elijah Olusegun; Daramola, Olufemi

    2011-01-01

    This research examines the stock control methods utilized by construction firms on construction sites with a view to assessing the factors affecting material stock control practice by construction firms as well as determining the impact of factors affecting material stock control on building project performance. Data were collected with the aid of well-structured questionnaire administered on a number of construction professionals and technicians in some randomly selected building constructio...

  12. Integrated constructed wetland systems: design, operation, and performance of low-cost decentralized wastewater treatment systems.

    Science.gov (United States)

    Behrends, L L; Bailey, E; Jansen, P; Houke, L; Smith, S

    2007-01-01

    Several different types of constructed wetland systems are being used as decentralized treatment systems including surface-flow, subsurface-flow, vertical-flow, and hybrid systems. Archetypical wetland systems have design strengths and weaknesses, and therefore it should be possible to design combined (integrated) systems to optimize a number of important treatment processes. This study provides comparative efficacy data for two integrated wetland treatment systems (IWTS) designed to enhance treatment of medium strength wastewater generated from a pilot-scale intensive fish farm. Results from the twenty eight months study included consistently high removal of COD (84% +) and ammonia nitrogen (93%) in both systems. Initially, phosphorus removal was also high (>90%) in both systems, but removal efficacy declined significantly over time. Nitrate removal was significantly better in the system that provided sequential aerobic and anoxic environments. Short hydraulic retention times coupled with sustained removal of COD and ammonia indicate that the ReCip components could be a least-cost wastewater treatment technology in the decentralized market sector.

  13. Blind polarization demultiplexing by constructing a cost function for coherent optical PDM-OFDM.

    Science.gov (United States)

    Yu, Zhenming; Chen, Minghua; Chen, Hongwei; Yi, Xingwen; Yang, Sigang; Xie, Shizhong

    2015-07-13

    We propose a training symbols-free polarization demultiplexing method by constructing a cost function (CCF-PDM) for coherent optical PDM-OFDM. This method is applicable for high-speed, wide-bandwidth OFDM signals, different subcarrier modulation formats and long-haul transmission. It shows comparable performance with that of conventional method but without overhead and converges fast. Since the neighboring subcarriers experience similar polarization effects, we set the initial matrix parameters by the neighboring subcarrier to reduce the number of iteration for the gradient algorithm and prevent swapping the data of the two orthogonal polarizations. We verify this method in experiment by transmitting 66.6-Gb/s PDM-OFDM signal with 4QAM subcarrier modulation over 5440 km SSMF and 133.3-Gb/s PDM-OFDM signal with 16QAM subcarrier modulation over 960 km SSMF respectively. We compare its performance with that of training symbols. We also analyze the convergence speed of this method.

  14. An introduction to constructed wetlands (reed beds) sustainable low cost wastewater treatment plants

    International Nuclear Information System (INIS)

    Ahmad, M.I.

    2005-01-01

    The use of 'conventional' wastewater treatment technology (trickling filters and activated sludge) in developing countries has often been unsuccessful due to high cost, complex operating requirements and expensive maintenance procedures. Typical examples of such projects are wastewater plants in Islamabad and Karachi. Actually the conventional systems, such as trickling filters and activated sludge plants were developed to address the concerns about organic pollution of natural water bodies in western temperate climates, rather than the reduction of organic matter as well as pathogens which is often a priority in developing countries. Pakistan, being a developing country cannot and should not follow the western technology blindly but needs the use of a ppropriate technology . Appropriate technology is defined as a treatment system which meets the following criteria: Affordable: Total amount costs, including capital, operation, maintenance and depreciation are within the user's ability to pay. Operable: Operation of the system is possible with locally available labor and support. Reliable: Effluent quality requirements can be met consistently. Currently there are a limited number of appropriate technologies for small communities, which should be considered by a community and their designers. These include conventional and non-conventional systems such as stabilization ponds or lagoons, slow sand filters, land treatment systems, and wetlands (natural or constructed). The non-conventional systems often utilize 'ecological' treatment mechanism (such as aquatic systems or wetlands) and do not have the mechanical parts or energy requirements of conventional systems. Waste Stabilization Ponds are one such solution but sometimes are constrained by land availability, topography, and are not environment friendly. In such locations, natural or constructed wetlands (Reed Beds) could provide an alternative technology. It is what we call a LOW technology, rather than HI TECH

  15. 3D design terrain models for construction plans and GPS control of highway construction equipment.

    Science.gov (United States)

    2010-03-01

    Research was conducted with the objectives of 1) identifying and characterizing benefits and technological, institutional, cultural, and : legal impediments associated with adoption of 3D design and construction technologies, identifying strategies t...

  16. Large Constructed Wetlands for Phosphorus Control: A Review

    Directory of Open Access Journals (Sweden)

    Robert H. Kadlec

    2016-06-01

    Full Text Available This paper reviews aspects of the performance of large (>40 ha constructed treatment wetlands intended for phosphorus control. Thirty-seven such wetlands have been built and have good data records, with a median size of 754 ha. All are successfully removing phosphorus from a variety of waters. Period of record median concentration reductions were 71%, load reductions 0.77 gP·m−2·year−1, and rate coefficients 12.5 m·year−1. Large wetlands have a narrower performance spectrum than the larger group of all sizes. Some systems display startup trends, ranging to several years, likely resulting from antecedent soil and vegetation conditions. There are internal longitudinal gradients in concentration, which vary with lateral position and flow conditions. Accretion in inlet zones may require attention. Concentrations are reduced to plateau values, in the range of about 10–50 mgP·m−3. Vegetation type has an effect upon performance measures, and its presence facilitates performance. Trends in the performance measures over the history of individual systems display only small changes, with both increases and decreases occurring. Such trends remove little of the variance in behavior. Seasonality is typically weak for steady flow systems, and most variability appears to be stochastic. Stormwater systems display differences between wet and dry season behavior, which appear to be flow-driven. Several models of system performance have been developed, both steady and dynamic.

  17. Multiagent based Distributed Control for Operation Cost Minimization of Droop Controlled AC Microgrid Using Incremental Cost Consensus

    DEFF Research Database (Denmark)

    Li, Chendan; Firoozabadi, Mehdi Savaghebi; Quintero, Juan Carlos Vasquez

    2015-01-01

    sharing based on the power rating. With various types of distributed generator (DG) units in the system, factors that closely related to the operation cost, such as fuel cost and efficiencies of the generator should be taken into account in order to improve the efficiency of the whole system....... In this paper, a multiagent based distributed method is proposed to minimize operation cost of the AC microgrid. Each DG is acting as an agent which regulates the power individually using proposed frequency scheduling method. Optimal power command is obtained through carefully designed consensus algorithm...... with only light communication between neighboring agents. Case studies verified that the proposed control strategy can effectively reduce the operation cost....

  18. Resilient guaranteed cost control of a power system.

    Science.gov (United States)

    Soliman, Hisham M; Soliman, Mostafa H; Hassan, Mohammad F

    2014-05-01

    With the development of power system interconnection, the low-frequency oscillation is becoming more and more prominent which may cause system separation and loss of energy to consumers. This paper presents an innovative robust control for power systems in which the operating conditions are changing continuously due to load changes. However, practical implementation of robust control can be fragile due to controller inaccuracies (tolerance of resistors used with operational amplifiers). A new design of resilient (non-fragile) robust control is given that takes into consideration both model and controller uncertainties by an iterative solution of a set of linear matrix inequalities (LMI). Both uncertainties are cast into a norm-bounded structure. A sufficient condition is derived to achieve the desired settling time for damping power system oscillations in face of plant and controller uncertainties. Furthermore, an improved controller design, resilient guaranteed cost controller, is derived to achieve oscillations damping in a guaranteed cost manner. The effectiveness of the algorithm is shown for a single machine infinite bus system, and then, it is extended to multi-area power system.

  19. Costs of children--benefit theory and population control.

    Science.gov (United States)

    Tian, X

    1989-01-01

    In order to stem the rising fertility and growth rates in China, new theories and measures are needed. The author suggests new insights into the relationships between reproductive behavior and economic interests, regulation of individual reproductive behavior by such economic interests, and governmental performance with these interests in mind. Topics are devoted to the benefit theory about the costs of children, trends in Chinese children's costs and benefits, and family planning (FP) based on children's costs and benefits. Natural biological law governed people's reproductive behavior and the number of offspring until there was control over human reproduction. Factors which determine the desired number of children can be economic, cultural, political, historical, or geographical. In modern times and with the commercialism of society, children have been sometimes viewed as commodities and Western economists (Becker and Leibenstein) have theorized the cost benefit ratio to parents. Expected positive benefits are support, labor force contribution, and family happiness. Negative benefits are the direct and indirect costs in time and money raising children. Children are produced where benefits are positive, and where benefits and costs are equal, circumstances will determine the result. No children will be produced when costs exceed benefits. The concept of net costs is described. Chinese trends indicate a direction toward a market oriented economy. Instead of following Western theory, as economic development has advanced rapidly the value of children has grown. The reasons are explained as marginal children may still bring benefits in a market where the function of regulation of a labor market is limited, children still render better support for their parents without a developed social security system, and boys are expected to secure their families fortunes during the changing economic conditions. The author recognizes that other conditions such as the number of

  20. Costs and benefits of sulphur oxide control: a methodological study

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The objective is to present for the first time a methodology for estimating the costs and benefits of SO/sub x/ control strategies as an aid o policy formulation which could create the basis for further action in member countries. To illustrate the methodology, different control scenarios for Western Europe are developed and analyzed using the cost-benefit approach, and some preliminary conclusions are drawn. The next step assesses the impact of the emissions on ambient air quality, calculated with the aid of long-range and urban air quality models. Finally, the impact of the calculated concentrations of SO/sub x/ in the different scenarios on a number of environmental and human assets - materials, agricultural crops, health, and aquatic ecosystems - are estimated in order to have a measure of the benefits of control.

  1. Robust guaranteed cost tracking control of quadrotor UAV with uncertainties.

    Science.gov (United States)

    Xu, Zhiwei; Nian, Xiaohong; Wang, Haibo; Chen, Yinsheng

    2017-07-01

    In this paper, a robust guaranteed cost controller (RGCC) is proposed for quadrotor UAV system with uncertainties to address set-point tracking problem. A sufficient condition of the existence for RGCC is derived by Lyapunov stability theorem. The designed RGCC not only guarantees the whole closed-loop system asymptotically stable but also makes the quadratic performance level built for the closed-loop system have an upper bound irrespective to all admissible parameter uncertainties. Then, an optimal robust guaranteed cost controller is developed to minimize the upper bound of performance level. Simulation results verify the presented control algorithms possess small overshoot and short setting time, with which the quadrotor has ability to perform set-point tracking task well. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.

  2. Analysis of selected factors that generate the costs of accidents at work using the Polish construction industry as an example

    Directory of Open Access Journals (Sweden)

    Hoła Anna

    2016-01-01

    Full Text Available The paper presents analysis of selected factors that generate the costs of accidents at work using the Polish construction industry as an example. The individual components of the cost of accidents have been identified. Using the statistical data published by the Central Statistical Office, the impact on the size of the cost of accidents at work of such factors as the lost time of an injured person, the lost time of other people involved in the removal of accident effects and also material losses caused by an accident, was analysed. On the basis of the conducted analysis, conclusions regarding economic losses due to accidents were formulated.

  3. Modelo PEF de costes de la calidad como herramienta de gestión en empresas constructoras: una visión actual Quality costs PEF model as a management tool in construction firms: a present vision

    Directory of Open Access Journals (Sweden)

    Santos Gracia Villar

    2007-04-01

    Full Text Available Los costes de la calidad representan una herramienta de planificación de la calidad, que permite la medición de la mejora continua. Se realizó una revisión bibliográfica y discusión de las publicaciones actuales sobre los modelos genéricos de costes de la calidad. Se observó que el modelo genérico empleado con mayor frecuencia, sigue siendo el enfoque tradicional PEF (prevención, evaluación y fallos. De esta manera, se plantea este modelo en el contexto de las empresas constructoras, como herramienta de gestión de la calidad, destacando la forma en que la gestión eficaz de estos, puede reflejarse en las utilidades y productividad de dicha empresa. De igual manera, se sugiere que los costes de la calidad pueden calcularse y ser expresados en forma contable, proporcionando un parámetro en el que podemos decidir sobre los beneficios que trae su control. El objetivo de un sistema de costes de la calidad es encontrar el nivel de calidad requerido para minimizar los costes de la calidad totales, esto dará la seguridad que dicha empresa constructora esta funcionando de manera óptima con relación a sus procesos y productosThe quality costs are a quality management tool to measure the continual improvement. It was made a bibliographical revision and discussion of present publications on the generic models of quality costs. It was observed that the most frequently used generic model, continues being traditional approach PAF (prevention, appraisal and failures. So, this model was established in a construction firm context as a quality management tool, pointing out the form in that the effective management of these can be reflected in the utilities and productivity of a construction firm. Also, is suggested that quality costs can be calculated and be recorded in a countable form, providing a parameter to decide on the benefits that its control brings. The objective of a quality costs system is to find the level of quality that minimizes

  4. Evaluating the Modus Operandi of Construction Supply Chain using Organization Control Theory

    Directory of Open Access Journals (Sweden)

    Milind Jagtap

    2015-07-01

    Full Text Available Supply chains are omnipresent. However, the modus operandi of the construction supply chain is not clearly established in the literature. This might be attributable to the character of construction projects and the structure of the construction industry. Formal and informal control mechanisms are well established in retail and manufacturing supply chains which is evident in improved product performance. However, there is a paucity of research on the construction supply chain especially at identifying the interplay of control mechanisms and their relationship with project performance. In the case of large and complex construction projects, the client-contractor relationship requires input control, behaviour control and output control for successful project delivery. In the light of organisation control theory and the existing literature on construction supply chains, this study evaluates the modus operandi of the client-contractor relationship based on three control mechanisms: input control (project risk and reward power, and intra-project communication, behaviour control (opportunism and output control (project performance using a structural equation model. A survey data of 258 construction professionals working on construction projects in India was collected. The study findings reveal that input control, in terms of project risk and reward power, and intraproject communication, largely influence behaviour control in terms of opportunism. However, behaviour controls do not directly affect output control in terms of project performance; rather, a direct effect of the input control mechanism of output control is particularly evident.

  5. The effect of elevated CO2 on the chemical composition and construction costs of leaves of 27 C-3 species

    NARCIS (Netherlands)

    Poorter, H; VanBerkel, Y; Baxter, R; DenHertog, J; Dijkstra, P; Gifford, RM; Griffin, KL; Roumet, C; Roy, J

    We determined the proximate chemical composition as well as the construction costs of leaves of 27 species, grown at ambient and at a twice-ambient partial pressure of atmospheric CO2, These species comprised wild and agricultural herbaceous plants as well as tree seedlings, Both average responses

  6. The effect of elevated CO2 on the chemical composition and construction costs of leaves of 27 C3 species

    NARCIS (Netherlands)

    Poorter, H.; Berkel, Y. van; Baxter, B.; Hertog, J. den; Dijkstra, P.; Gifford, R.M.; Griffin, K.L.; Roumet, C.; Roy, J.; Wong, S.C.

    1997-01-01

    We determined the proximate chemical composition as well as the construction costs of leaves of 27 species, grown at ambient and at a twice-ambient partial pressure of atmospheric CO₂. These species comprised wild and agricultural herbaceous plants as well as tree seedlings. Both average

  7. Construction of a low cost wind energy generator; Construcao de um gerador de energia eolica de baixo custo

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Jonathan Penha de; Almeida, Silvio Carlos Anibal de [Universidade Federal do Rio de Janeiro (DEM/EP/UFRJ), RJ (Brazil). Escola Politecnica. Dept. de Engenharia Mecanica], Emails: jonathan_penha@poli.ufrj.br, silvioa@gmail.com

    2010-07-01

    This project presents a low cost wind electric power generator constituted of cheap and easy access materials. The necessary materials are presented for it construction and the expected efficiency, having as reference the city of Fernando de Noronha, Brazil. The elaboration of the generator was initially developed as alternative energy source during blackout.

  8. Labor productivity adjustment factors. A method for estimating labor construction costs associated with physical modifications to nuclear power plants

    International Nuclear Information System (INIS)

    Riordan, B.J.

    1986-03-01

    This report develops quantitative labor productivity adjustment factors for the performance of regulatory impact analyses (RIAs). These factors will allow analysts to modify ''new construction'' labor costs to account for changes in labor productivity due to differing work environments at operating reactors and at reactors with construction in progress. The technique developed in this paper relies on the Energy Economic Data Base (EEDB) for baseline estimates of the direct labor hours and/or labor costs required to perform specific tasks in a new construction environment. The labor productivity cost factors adjust for constraining conditions such as working in a radiation environment, poor access, congestion and interference, etc., which typically occur on construction tasks at operating reactors and can occur under certain circumstances at reactors under construction. While the results do not portray all aspects of labor productivity, they encompass the major work place conditions generally discernible by the NRC analysts and assign values that appear to be reasonable within the context of industry experience. 18 refs

  9. Novel cost controlled materials and processing for primary structures

    Science.gov (United States)

    Dastin, S. J.

    1993-01-01

    Textile laminates, developed a number of years ago, have recently been shown to be applicable to primary aircraft structures for both small and large components. Such structures have the potential to reduce acquisition costs but require advanced automated processing to keep costs controlled while verifying product reliability and assuring structural integrity, durability and affordable life-cycle costs. Recently, resin systems and graphite-reinforced woven shapes have been developed that have the potential for improved RTM processes for aircraft structures. Ciba-Geigy, Brochier Division has registered an RTM prepreg reinforcement called 'Injectex' that has shown effectivity for aircraft components. Other novel approaches discussed are thermotropic resins producing components by injection molding and ceramic polymers for long-duration hot structures. The potential of such materials and processing will be reviewed along with initial information/data available to date.

  10. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  11. The regional costs and benefits of acid rain control

    International Nuclear Information System (INIS)

    Berkman, M.P.

    1991-01-01

    Congress recently enacted acid rain control legislation as part of the 1990 Clean Air Act Amendments following a decade-long debate among disparate regional interests. Although Congress succeeded in drafting a law acceptable to all regions, the regional costs and benefits of the legislation remain uncertain. The research presented here attempts to estimate the regional costs and benefits and the economic impacts of acid rain controls. These estimates are made using a modeling system composed of econometric, linear programming and input-output models. The econometric and linear programming components describe markets for electricity and coal. The outputs of these components including capital investment, electricity demand, and coal production are taken as exogenous inputs by a multiregional input-output model. The input-output model produces estimates of changes in final demand, gross output, and employment. The utility linear programming model also predicts sulfur dioxide emissions (an acid-rain precursor). According to model simulations, the costs of acid rain control exceed the benefits for many regions including several regions customarily thought to be the major beneficiaries of acid rain control such as New England

  12. Why are there failures of systematicity? The empirical costs and benefits of inducing universal constructions

    Directory of Open Access Journals (Sweden)

    Steven Phillips

    2016-08-01

    Full Text Available Systematicity is a property of cognition where capacity for certain cognitive abilities implies capacity for certain other (structurally related cognitive abilities. This property is thought to derive from a capacity to represent/process common structural relations between constituents of cognizable entities, however, systematicity may not always materialize in such admissible contexts. A theoretical challenge is to explain why systematicity fails to materialize in contexts that allow the realization (e.g., by induction of common structure (universal construction. We hypothesize that one cause of failure arises when the potential gain afforded by induction of common structure is overshadowed by the immediate benefit of learning the task as independent stimulus-response associations. This hypothesis was tested in an experiment that required learning two series of pair maps that involved products (universal construction, or non-products (control of varied size: the number of unique cue/target elements (three to six constituting pairs. Each series was learned in either ascending or descending order of size. Only performance on the product series was affected by order: systematicity was obtained universally in the descend group, but only on large sets in the ascend group, as revealed by the significant order x size interaction for errors in the product condition, F(3, 87 = 3.38, p < .05. Smaller maps are more easily learned without inducing the common product structure, which is more readily observable with larger maps: larger maps provide more evidence for relationships between stimulus dimensions that facilitate the discovery of the common structure. The new challenge, then, is to explain the systematic learnability of stimulus-response maps, i.e. second-order systematicity.

  13. An Empirical Study of Agricultural Product Logistics Cost Control Evaluation via Fuzzy Analytic Hierarchy Process

    OpenAIRE

    Qianxia Lu; Yazhou Xiong; Ling Wei

    2015-01-01

    It is one of the core agricultural logistics cost control to establish a reasonable and effective evaluation system of agricultural logistics cost control. In this study, based on the cost basis of the value chain, an agricultural logistics cost control evaluation system is established from three levels, including the logistics costs of agricultural pre-value chain, logistics costs of agricultural mid-value chain, logistics costs of agricultural late-value chain. AHP theory and expert investi...

  14. Arms control verification costs: the need for a comparative analysis

    International Nuclear Information System (INIS)

    MacLean, G.; Fergusson, J.

    1998-01-01

    The end of the Cold War era has presented practitioners and analysts of international non-proliferation, arms control and disarmament (NACD) the opportunity to focus more intently on the range and scope of NACD treaties and their verification. Aside from obvious favorable and well-publicized developments in the field of nuclear non-proliferation, progress also has been made in a wide variety of arenas, ranging from chemical and biological weapons, fissile material, conventional forces, ballistic missiles, to anti-personnel landmines. Indeed, breaking from the constraints imposed by the Cold War United States-Soviet adversarial zero-sum relationship that impeded the progress of arms control, particularly on a multilateral level, the post Cold War period has witnessed significant developments in NACD commitments, initiatives, and implementation. The goals of this project - in its final iteration - will be fourfold. First, it will lead to the creation of a costing analysis model adjustable for uses in several current and future arms control verification tasks. Second, the project will identify data accumulated in the cost categories outlined in Table 1 in each of the five cases. By comparing costs to overall effectiveness, the application of the model will demonstrate desirability in each of the cases (see Chart 1). Third, the project will identify and scrutinize 'political costs' as well as real expenditures and investment in the verification regimes (see Chart 2). And, finally, the project will offer some analysis on the relationship between national and multilateral forms of arms control verification, as well as the applicability of multilateralism as an effective tool in the verification of international non-proliferation, arms control, and disarmament agreements. (author)

  15. Weight and cost analysis of large wind turbine rotors constructed from conventional materials and from advanced composite materials

    Energy Technology Data Exchange (ETDEWEB)

    van Holten, Th

    1982-07-01

    Cost calculations and cost analyses of the blades and the (teetering) hubs of large wind turbines. The blades are of different shapes, construction and materials (aluminium, steel and glass reinforced plastics). Teetering hubs are heavy and complicated steel constructions, necessary to minimize material fatigue. In large wind turbines with a diameter of 60 to 100 m or even more the rotor mass (hubs and blades together) may vary from 46,000 to 216,000 kg. Costs are estimated to be DFL. 16/kg, both for teetering hubs and/or blades made of glass reinforced plastics. Due to lack of experience and of exact knowledge of the loads appearing during operation under field conditions the uncertainty factor may be 10% to 15%.

  16. Cost of Dengue Vector Control Activities in Malaysia

    Science.gov (United States)

    Packierisamy, P. Raviwharmman; Ng, Chiu-Wan; Dahlui, Maznah; Inbaraj, Jonathan; Balan, Venugopalan K.; Halasa, Yara A.; Shepard, Donald S.

    2015-01-01

    Dengue fever, an arbovirus disease transmitted by Aedes mosquitoes, has recently spread rapidly, especially in the tropical countries of the Americas and Asia-Pacific regions. It is endemic in Malaysia, with an annual average of 37,937 reported dengue cases from 2007 to 2012. This study measured the overall economic impact of dengue in Malaysia, and estimated the costs of dengue prevention. In 2010, Malaysia spent US$73.5 million or 0.03% of the country's GDP on its National Dengue Vector Control Program. This spending represented US$1,591 per reported dengue case and US$2.68 per capita population. Most (92.2%) of this spending occurred in districts, primarily for fogging. A previous paper estimated the annual cost of dengue illness in the country at US$102.2 million. Thus, the inclusion of preventive activities increases the substantial estimated cost of dengue to US$175.7 million, or 72% above illness costs alone. If innovative technologies for dengue vector control prove efficacious, and a dengue vaccine was introduced, substantial existing spending could be rechanneled to fund them. PMID:26416116

  17. Cost of Dengue Vector Control Activities in Malaysia.

    Science.gov (United States)

    Packierisamy, P Raviwharmman; Ng, Chiu-Wan; Dahlui, Maznah; Inbaraj, Jonathan; Balan, Venugopalan K; Halasa, Yara A; Shepard, Donald S

    2015-11-01

    Dengue fever, an arbovirus disease transmitted by Aedes mosquitoes, has recently spread rapidly, especially in the tropical countries of the Americas and Asia-Pacific regions. It is endemic in Malaysia, with an annual average of 37,937 reported dengue cases from 2007 to 2012. This study measured the overall economic impact of dengue in Malaysia, and estimated the costs of dengue prevention. In 2010, Malaysia spent US$73.5 million or 0.03% of the country's GDP on its National Dengue Vector Control Program. This spending represented US$1,591 per reported dengue case and US$2.68 per capita population. Most (92.2%) of this spending occurred in districts, primarily for fogging. A previous paper estimated the annual cost of dengue illness in the country at US$102.2 million. Thus, the inclusion of preventive activities increases the substantial estimated cost of dengue to US$175.7 million, or 72% above illness costs alone. If innovative technologies for dengue vector control prove efficacious, and a dengue vaccine was introduced, substantial existing spending could be rechanneled to fund them. © The American Society of Tropical Medicine and Hygiene.

  18. H 2 guaranteed cost control of discrete linear systems

    Directory of Open Access Journals (Sweden)

    Colmenares W.

    2000-01-01

    Full Text Available This paper presents necessary and sufficient conditions for the existence of a quadratically stabilizing output feedback controller which also assures H 2 guaranteed cost performance on a discrete linear uncertain system where the uncertainty is of the norm bounded type. The conditions are presented as a collection of linear matrix inequalities.The solution, however requires a search over a scalar parameter space.

  19. Impaired photosynthesis and increased leaf construction costs may induce floral stress during episodes of global warming over macroevolutionary timescales.

    Science.gov (United States)

    Haworth, Matthew; Belcher, Claire M; Killi, Dilek; Dewhirst, Rebecca A; Materassi, Alessandro; Raschi, Antonio; Centritto, Mauro

    2018-04-18

    Global warming events have coincided with turnover of plant species at intervals in Earth history. As mean global temperatures rise, the number, frequency and duration of heat-waves will increase. Ginkgo biloba was grown under controlled climatic conditions at two different day/night temperature regimes (25/20 °C and 35/30 °C) to investigate the impact of heat stress. Photosynthetic CO 2 -uptake and electron transport were reduced at the higher temperature, while rates of respiration were greater; suggesting that the carbon balance of the leaves was adversely affected. Stomatal conductance and the potential for evaporative cooling of the leaves was reduced at the higher temperature. Furthermore, the capacity of the leaves to dissipate excess energy was also reduced at 35/30 °C, indicating that photo-protective mechanisms were no longer functioning effectively. Leaf economics were adversely affected by heat stress, exhibiting an increase in leaf mass per area and leaf construction costs. This may be consistent with the selective pressures experienced by fossil Ginkgoales during intervals of global warming such as the Triassic - Jurassic boundary or Early Eocene Climatic Optimum. The physiological and morphological responses of the G. biloba leaves were closely interrelated; these relationships may be used to infer the leaf economics and photosynthetic/stress physiology of fossil plants.

  20. Costs of disarmament - Rethinking the price tag: A methodological inquiry into the costs and benefits of arms control

    International Nuclear Information System (INIS)

    Willett, S.

    2002-06-01

    The growing number of arms control and disarmament treaties agreed on over the past decades as well as rising concerns about harmful environmental and public health effects of weapons disposal, have understandably led to an increase in the cost of implementing arms control agreements. As a result, the expenses associated with treaty compliance have emerged as a contentious issue within the realm of arms control and disarmament discussions. In particular, opponents of arms control and disarmament point to perceived rising costs of meeting current and proposed treaty obligations in an attempt to limit and undermine such activities. Yet determining just how much arms control and disarmament cost remains very much an ambiguous task. In Costs of Disarmament - Rethinking the Price Tag: A Methodological Inquiry into the Costs and Benefits of Arms Control, Susan Willett addresses the question of how the cost of arms control ought to be measured. Emphasizing the proper allocation of costs associated with arms control treaty implementation to the life cycle costs of weapon systems and their correct weighing against the benefits they procure in terms of averted arms races and increased international security, Willett argues for a revised methodology of costing arms control and disarmament that gives a more accurate - and significantly lower - estimate of the latter. Adopting such a revised methodology concludes the author, might dispel considerable misunderstanding and help point decisions over arms control and disarmament in the right direction

  1. STABILITY CONTROL OF ELEVATING-TRANSFER VEHICLES IN THE CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Zhadanovskiy Boris Vasil’evich

    2016-05-01

    Full Text Available The underground space is widely used in the construction in big cities of the Russian Federation. These works need the use of elevating-transfer vehicles. In this case the requirements of norms and regulations on operating safety should be strictly observed, because their breach often leads to emergency situations and injuries. The organizational and technological solutions when developing the design documentation and executing construction and assembly works should be primarily based on the stability of lifting facilities. The author states the requirements to installation of lifting tackles (cranes. The features of their installation in different operation conditions on construction sites are described. The crane stability depends on many different indicators, which are considered by the author. The calculation algorithms of crane stability are offered.

  2. A cost-benefit analysis of tracking and tracing systems in road construction

    NARCIS (Netherlands)

    Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    A major problem in road construction is the lack of timely and accurate information about the location and productivity of equipment. As a result, the productivity rate of certain types of construction equipment is low and equipment has to be hired in from third parties. Lack of co-ordination

  3. A New Cost-Effective Diode Laser Polarimeter Apparatus Constructed by Undergraduate Students

    Science.gov (United States)

    Lisboa, Pedro; Sotomayor, Joo; Ribeiro, Paulo

    2010-01-01

    The construction of a diode laser polarimeter apparatus by undergraduate students is described. The construction of the modular apparatus by undergraduate students gives them an insight into how it works and how the measurement of a physical or chemical property is conducted. The students use the polarimeter to obtain rotation angle values for the…

  4. Quality control of Ling'ao nuclear power station civil construction

    International Nuclear Information System (INIS)

    Lu Buliang; Ye Changyuan

    2001-01-01

    Based on the quality control model adopted during Ling'ao Nuclear Power Station construction, the author briefly introduces quality control process of some main civil construction activities (reinforced concrete, steel liner, steel works and prestressing force) of nuclear power station, and makes some descriptions on non-conformance control of civil works. These quality control processes described come from the concrete practice during civil construction of Ling'ao Nuclear Power Station, and are based on Daya Bay Nuclear Power Station construction experience

  5. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-01-01

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups

  6. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    Energy Technology Data Exchange (ETDEWEB)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-11-26

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups.

  7. Attentional costs and failures in air traffic control notifications.

    Science.gov (United States)

    Imbert, Jean-Paul; Hodgetts, Helen M; Parise, Robert; Vachon, François; Dehais, Frédéric; Tremblay, Sébastien

    2014-01-01

    Large display screens are common in supervisory tasks, meaning that alerts are often perceived in peripheral vision. Five air traffic control notification designs were evaluated in their ability to capture attention during an ongoing supervisory task, as well as their impact on the primary task. A range of performance measures, eye-tracking and subjective reports showed that colour, even animated, was less effective than movement, and notifications sometimes went unnoticed. Designs that drew attention to the notified aircraft by a pulsating box, concentric circles or the opacity of the background resulted in faster perception and no missed notifications. However, the latter two designs were intrusive and impaired primary task performance, while the simpler animated box captured attention without an overhead cognitive cost. These results highlight the need for a holistic approach to evaluation, achieving a balance between the benefits for one aspect of performance against the potential costs for another. Practitioner summary: We performed a holistic examination of air traffic control notification designs regarding their ability to capture attention during an ongoing supervisory task. The combination of performance, eye-tracking and subjective measurements demonstrated that the best design achieved a balance between attentional power and the overhead cognitive cost to primary task performance.

  8. Implementation of GPS controlled highway construction equipment, phase III.

    Science.gov (United States)

    2009-02-01

    Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked : together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading : projects. These specifications and ...

  9. Recommendations for constructing forest stream crossings to control soil losses

    Science.gov (United States)

    Pamela J. Edwards; Jingxin Wang; Joshua T. Stedman

    2009-01-01

    Stream water samples were collected once daily and throughout storms from a small forested watershed in north central West Virginia for approximately 8 years. The turbidities of the samples were measured to determine how water quality changed in response to the construction of three associated stream crossings. The influence of the...

  10. Cost-benefit analysis of avian influenza control in Nepal.

    Science.gov (United States)

    Karki, S; Lupiani, B; Budke, C M; Karki, N P S; Rushton, J; Ivanek, R

    2015-12-01

    Numerous outbreaks of highly pathogenic avian influenza A strain H5N1 have occurred in Nepal since 2009 despite implementation of a national programme to control the disease through surveillance and culling of infected poultry flocks. The objective of the study was to use cost-benefit analysis to compare the current control programme (CCP) with the possible alternatives of: i) no intervention (i.e., absence of control measures [ACM]) and ii) vaccinating 60% of the national poultry flock twice a year. In terms of the benefit-cost ratio, findings indicate a return of US $1.94 for every dollar spent in the CCP compared with ACM. The net present value of the CCP versus ACM, i.e., the amount of money saved by implementing the CCP rather than ACM, is US $861,507 (the benefits of CCP [prevented losses which would have occurred under ACM] minus the cost of CCP). The vaccination programme yields a return of US $2.32 for every dollar spent when compared with the CCR The net present value of vaccination versus the CCP is approximately US $12 million. Sensitivity analysis indicated thatthe findings were robust to different rates of discounting, whereas results were sensitive to the assumed market loss and the number of birds affected in the outbreaks under the ACM and vaccination options. Overall, the findings of the study indicate that the CCP is economically superior to ACM, but that vaccination could give greater economic returns and may be a better control strategy. Future research should be directed towards evaluating the financial feasibility and social acceptability of the CCP and of vaccination, with an emphasis on evaluating market reaction to the presence of H5N1 infection in the country.

  11. Technical support for GEIS: radioactive waste isolation in geologic formations. Volume 18. Facility construction feasibility and costs by rock type

    International Nuclear Information System (INIS)

    1978-04-01

    The results of a study that compared the general engineering feasibility and unit costs associated with sinking shafts and mining storage rooms in the four rock types (salt, granite, shale, basalt) are presented in this volume. The report includes a discussion of the general effects of rock characteristics on shaft and mine design, the application of these design considerations to the specific designs developed for the Draft GEIS, shaft and mine construction techniques, and the unit cost comparison. The repository designs upon which this comparison was based are presented in other volumes of this series

  12. The design and construction of a controllable reactor with a HTS control winding

    International Nuclear Information System (INIS)

    Wass, Torbjoern; Hoernfeldt, Sven; Valdemarsson, Stefan

    2006-01-01

    Reactive power compensation is vital for obtaining efficient operation of long transmission power lines or cables. The need of reactive power changes with the load of the transmission line. Discrete units of conventional reactors are therefore switched in and out in order to obtain more efficient reactive power compensation. A continuous reactive compensation will reduce the transmission losses and increase the transmission capacity of active power. We have designed and constructed a one phase small scale prototype of a controllable shunt reactor with a high temperature superconducting control winding. The reactor consists basically of two windings and an iron core. The control winding is placed so that it generates a DC magnetic field perpendicular to the main AC magnetic field. Thus the DC current in the control winding can control the direction of the magnetization of the iron core and thereby the reactance of the reactor. Such a control winding will have low losses and give the reactor a large dynamic range. For this small scale reactor we found that the reactive power could be varied with a factor six. We have demonstrated the feasibility to design large scale controllable shunt reactors with large dynamic range and low losses utilizing a control winding made of a high temperature superconductor

  13. Impact and cost-effectiveness of snail control to achieve disease control targets for schistosomiasis.

    Science.gov (United States)

    Lo, Nathan C; Gurarie, David; Yoon, Nara; Coulibaly, Jean T; Bendavid, Eran; Andrews, Jason R; King, Charles H

    2018-01-23

    Schistosomiasis is a parasitic disease that affects over 240 million people globally. To improve population-level disease control, there is growing interest in adding chemical-based snail control interventions to interrupt the lifecycle of Schistosoma in its snail host to reduce parasite transmission. However, this approach is not widely implemented, and given environmental concerns, the optimal conditions for when snail control is appropriate are unclear. We assessed the potential impact and cost-effectiveness of various snail control strategies. We extended previously published dynamic, age-structured transmission and cost-effectiveness models to simulate mass drug administration (MDA) and focal snail control interventions against Schistosoma haematobium across a range of low-prevalence (5-20%) and high-prevalence (25-50%) rural Kenyan communities. We simulated strategies over a 10-year period of MDA targeting school children or entire communities, snail control, and combined strategies. We measured incremental cost-effectiveness in 2016 US dollars per disability-adjusted life year and defined a strategy as optimally cost-effective when maximizing health gains (averted disability-adjusted life years) with an incremental cost-effectiveness below a Kenya-specific economic threshold. In both low- and high-prevalence settings, community-wide MDA with additional snail control reduced total disability by an additional 40% compared with school-based MDA alone. The optimally cost-effective scenario included the addition of snail control to MDA in over 95% of simulations. These results support inclusion of snail control in global guidelines and national schistosomiasis control strategies for optimal disease control, especially in settings with high prevalence, "hot spots" of transmission, and noncompliance to MDA. Copyright © 2018 the Author(s). Published by PNAS.

  14. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    Science.gov (United States)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  15. BIM – New rules of measurement ontology for construction cost estimation

    Directory of Open Access Journals (Sweden)

    F.H. Abanda

    2017-04-01

    Full Text Available For generations, the process of cost estimation has been manual, time-consuming and error-prone. Emerging Building Information Modelling (BIM can exploit standard measurement methods to automate cost estimation process and improve inaccuracies. Structuring standard measurement methods in an ontologically and machine readable format for a BIM software can greatly facilitate the process of improving inaccuracies in cost estimation. This study explores the development of an ontology based on New Rules of Measurement (NRM for cost estimation during the tendering stages. The methodology adopted is methontology, one of the most widely used ontology engineering methodologies. To ensure the ontology is fit for purpose, cost estimation experts are employed to check the semantics, descriptive logic-based reasoners are used to syntactically check the ontology and a leading 4D BIM modelling software is used on a case study building to test/validate the proposed ontology.

  16. Design and Construction of a Computer Controlled Clothes Washing ...

    African Journals Online (AJOL)

    MICHAEL

    The search for easier and highly efficient ways of washing clothes ... This would help to reduce the running cost. .... It was only necessary to connect to the 8 data lines and the ... is actually a step further into complete automation of the clothes ...

  17. Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic

    Science.gov (United States)

    Vitásek, Stanislav; Matějka, Petr

    2017-09-01

    The article deals with problematic parts of automated processing of quantity takeoff (QTO) from data generated in BIM model. It focuses on models of road constructions, and uses volumes and dimensions of excavation work to create an estimate of construction costs. The article uses a case study and explorative methods to discuss possibilities and problems of data transfer from a model to a price system of construction production when such transfer is used for price estimates of construction works. Current QTOs and price tenders are made with 2D documents. This process is becoming obsolete because more modern tools can be used. The BIM phenomenon enables partial automation in processing volumes and dimensions of construction units and matching the data to units in a given price scheme. Therefore price of construction can be estimated and structured without lengthy and often imprecise manual calculations. The use of BIM for QTO is highly dependent on local market budgeting systems, therefore proper push/pull strategy is required. It also requires proper requirements specification, compatible pricing database and software.

  18. Cost Management Practices and Strategic Perspectives: a study in the construction industry of the State of Paraná

    OpenAIRE

    Almeida, Lauro Brito de; Machado, Esmael Almeida; Panhoca, Luiz

    2012-01-01

    The purpose of this paper is to investigate the cost management practices of building industry companies of Paraná that follow the typology of Porter´s strategies. The sample comprises member companies of the Association of Construction Industries of the State of Paraná (PR-SINDUSCON) operating in the segment of residential buildings. The data were collected by means of questionnaires sent to 317 SINDUSCON members. 69 were returned and 54 used for our research. Exploratory Factorial Analysis ...

  19. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  20. Construction risks of nuclear power plants for use in cost-effectiveness considerations

    International Nuclear Information System (INIS)

    Bock-Werthmann, W.

    1986-08-01

    The construction risk study is concerned with a nuclear power station of 1300 MW(e) design output. The risk figures obtained demonstrate that construction risks of nuclear power plants form a substantial share of the total risk from all steps of the nuclear fuel cycle. When compared with other risk figures it is apparent that only the fatalities caused by the extraction of uranium are of similar magnitude. (55 references). (DG)

  1. Retrospective Cost Adaptive Control with Concurrent Closed-Loop Identification

    Science.gov (United States)

    Sobolic, Frantisek M.

    Retrospective cost adaptive control (RCAC) is a discrete-time direct adaptive control algorithm for stabilization, command following, and disturbance rejection. RCAC is known to work on systems given minimal modeling information which is the leading numerator coefficient and any nonminimum-phase (NMP) zeros of the plant transfer function. This information is normally needed a priori and is key in the development of the filter, also known as the target model, within the retrospective performance variable. A novel approach to alleviate the need for prior modeling of both the leading coefficient of the plant transfer function as well as any NMP zeros is developed. The extension to the RCAC algorithm is the use of concurrent optimization of both the target model and the controller coefficients. Concurrent optimization of the target model and controller coefficients is a quadratic optimization problem in the target model and controller coefficients separately. However, this optimization problem is not convex as a joint function of both variables, and therefore nonconvex optimization methods are needed. Finally, insights within RCAC that include intercalated injection between the controller numerator and the denominator, unveil the workings of RCAC fitting a specific closed-loop transfer function to the target model. We exploit this interpretation by investigating several closed-loop identification architectures in order to extract this information for use in the target model.

  2. The quality control for biological-shield heavy concrete construction of nuclear power project

    International Nuclear Information System (INIS)

    Sun Hongjun; Ma Xinchao

    2012-01-01

    The paper introduces the function and characteristics of biological protective heavy-concrete, and its main application scope and role in Fangjiashan nuclear power project. From the aspects of raw material selection, mixing ratio test, heavy concrete production, the paper discusses the main control points of heavy concrete construction process, points out the basic characteristics of heavy concrete construction, and put forward measures to prevent density non-uniformity during heavy concrete construction and to control slump during transportation. Results prove that reasonable construction process control can assure the engineering quality. (authors)

  3. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  4. Guaranteed Cost Fault-Tolerant Control for Networked Control Systems with Sensor Faults

    Directory of Open Access Journals (Sweden)

    Qixin Zhu

    2015-01-01

    Full Text Available For the large scale and complicated structure of networked control systems, time-varying sensor faults could inevitably occur when the system works in a poor environment. Guaranteed cost fault-tolerant controller for the new networked control systems with time-varying sensor faults is designed in this paper. Based on time delay of the network transmission environment, the networked control systems with sensor faults are modeled as a discrete-time system with uncertain parameters. And the model of networked control systems is related to the boundary values of the sensor faults. Moreover, using Lyapunov stability theory and linear matrix inequalities (LMI approach, the guaranteed cost fault-tolerant controller is verified to render such networked control systems asymptotically stable. Finally, simulations are included to demonstrate the theoretical results.

  5. Radioisotopic methods for quality control of works and studies while constructing foundations and underground structures

    International Nuclear Information System (INIS)

    Smorodinov, M.I.

    1980-01-01

    The data on the use of radioisotope methods of quality control of various kinds of construction works when building foundations and underground constructions and when carrying out scientific research, are presented. Devices and equipment are described, their block diagrams are presented. The experience in using radioisotope devices to control the quality of construction works, is presented. The problems of economic effectivenes of works using radioisotope devices are solved

  6. 49 CFR 639.23 - Calculation of purchase or construction cost.

    Science.gov (United States)

    2010-10-01

    ...) Ancillary costs such as delivery and installation; plus (3) The net present value of the estimated future... the fair market value of the asset as of the date the lease will terminate pursuant to Guidelines...

  7. Comparing in-house staff and consultant costs for highway design and construction.

    Science.gov (United States)

    2011-07-01

    In May 2011, the Senate Standing Committee on Budget and Fiscal Review added language to the budget : bill that requires Caltrans to commission an independent study of the costs and benefits of hiring : consultants to address temporary increases in w...

  8. Low-Cost Undergraduate Control Systems Experiments Using Microcontroller-Based Control of a DC Motor

    Science.gov (United States)

    Gunasekaran, M.; Potluri, R.

    2012-01-01

    This paper presents low-cost experiments for a control systems laboratory module that is worth one and a third credits. The experiments are organized around the microcontroller-based control of a permanent magnet dc motor. The experimental setups were built in-house. Except for the operating system, the software used is primarily freeware or free…

  9. 49 CFR 173.474 - Quality control for construction of packaging.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Quality control for construction of packaging. 173...-GENERAL REQUIREMENTS FOR SHIPMENTS AND PACKAGINGS Class 7 (Radioactive) Materials § 173.474 Quality control for construction of packaging. Prior to the first use of any packaging for the shipment of Class 7...

  10. A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large-Scale Construction Project

    Directory of Open Access Journals (Sweden)

    Jiuping Xu

    2012-01-01

    Full Text Available The aim of this study is to deal with a minimum cost network flow problem (MCNFP in a large-scale construction project using a nonlinear multiobjective bilevel model with birandom variables. The main target of the upper level is to minimize both direct and transportation time costs. The target of the lower level is to minimize transportation costs. After an analysis of the birandom variables, an expectation multiobjective bilevel programming model with chance constraints is formulated to incorporate decision makers’ preferences. To solve the identified special conditions, an equivalent crisp model is proposed with an additional multiobjective bilevel particle swarm optimization (MOBLPSO developed to solve the model. The Shuibuya Hydropower Project is used as a real-world example to verify the proposed approach. Results and analysis are presented to highlight the performances of the MOBLPSO, which is very effective and efficient compared to a genetic algorithm and a simulated annealing algorithm.

  11. A Low Cost Sensor Controller for Health Monitoring

    Science.gov (United States)

    Birbas, M.; Petrellis, N.; Gioulekas, F.

    2015-09-01

    Aging population can benefit from health care systems that allow their health and daily life to be monitored by expert medical staff. Blood pressure, temperature measurements or more advanced tests like Electrocardiograms (ECG) can be ordered through such a healthcare system while urgent situations can be detected and alleviated on time. The results of these tests can be stored with security in a remote cloud or database. Such systems are often used to monitor non-life threatening patient health problems and their advantage in lowering the cost of the healthcare services is obvious. A low cost commercial medical sensor kit has been used in the present work, trying to improve the accuracy and stability of the sensor measurements, the power consumption, etc. This Sensor Controller communicates with a Gateway installed in the patient's residence and a tablet or smart phone used for giving instructions to the patient through a comprehensive user interface. A flexible communication protocol has been defined supporting any short or long term sensor sampling scenario. The experimental results show that it is possible to achieve low power consumption by applying apropriate sleep intervals to the Sensor Controller and by deactivating periodically some of its functionality.

  12. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models

  13. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models.

  14. A Lean Framework for Production Control in Complex and Constrained Construction Projects (PC4P)

    DEFF Research Database (Denmark)

    Lindhard, Søren Munch; Wandahl, Søren

    2014-01-01

    Production conditions in construction are different than in themanufacturing industry. First of all, construction is rooted in place and conducted as on-site manufacturing. Secondly, every construction project is unique and a one-of-a-kind production, managed by a temporary organization consisting...... and constrained construction project. Even though several tools have attempted to add structure and to create order, to the complex, dynamic, and uncertain context in which constructions is conducted, none has yet fully succeeded in providing a robust production control system. With outset in the lean tool Last...

  15. Cost-Effective Uses of Lightweight Aggregate Made from Dredged Material in Construction

    Science.gov (United States)

    2018-01-31

    Lightweight aggregate (LWA) can be used in concrete to reduce its self-weight and improve its workability and durability. It could potentially be used as borrow for embankment construction, which is expected to reduce the stresses on the subgrade fou...

  16. Causes of construction cost and time overruns: The 2010 FIFA World ...

    African Journals Online (AJOL)

    the FIFA World Cup remains a sought after goal for any country. Due to the magnitude ... unit of measure, the quantitative results from measuring against original project ... already identified (Dell'Apa, 2008), the South African construction industry started ... A study completed by the International Program in the Management.

  17. Construction of an internal amplification control for Mycobacterium ...

    African Journals Online (AJOL)

    Elham

    2013-07-03

    Jul 3, 2013 ... million and 10 bacteria and the most suitable internal control concentration for the mix was ... But the risk of contamination is unavoidable in normal ..... Contamination Management: Implication for Broad-Range Ribosomal.

  18. THE IMPACT OF THE BASIC ASSETS EFFICIENCY ON THE OF CONSTRUCTION PRODUCTS COST PRICE

    Directory of Open Access Journals (Sweden)

    M. Z. Zeynalov

    2015-01-01

    Full Text Available In article are considered problems of the analysis of the influence mode to usages and conditions of the building technology and facilities to mechanizations on prime cost produced building product. It is offered original scheme intercropping the factors, in accordance with influence of the working expenses of the facilities of the lab our on prime cost of the building product. The offered methods of the estimation physical wear-out level of the building technology and competitiveness of the active part of production assets of the building enterprise.

  19. Survey of LWR environmental control technology performance and cost

    International Nuclear Information System (INIS)

    Heeb, C.M.; Aaberg, R.L.; Cole, B.M.; Engel, R.L.; Kennedy, W.E. Jr.; Lewallen, M.A.

    1980-03-01

    This study attempts to establish a ranking for species that are routinely released to the environment for a projected nuclear power growth scenario. Unlike comparisons made to existing standards, which are subject to frequent revision, the ranking of releases can be used to form a more logical basis for identifying the areas where further development of control technology could be required. This report describes projections of releases for several fuel cycle scenarios, identifies areas where alternative control technologies may be implemented, and discusses the available alternative control technologies. The release factors were used in a computer code system called ENFORM, which calculates the annual release of any species from any part of the LWR nuclear fuel cycle given a projection of installed nuclear generation capacity. This survey of fuel cycle releases was performed for three reprocessing scenarios (stowaway, reprocessing without recycle of Pu and reprocessing with full recycle of U and Pu) for a 100-year period beginning in 1977. The radioactivity releases were ranked on the basis of a relative ranking factor. The relative ranking factor is based on the 100-year summation of the 50-year population dose commitment from an annual release of radioactive effluents. The nonradioactive releases were ranked on the basis of dilution factor. The twenty highest ranking radioactive releases were identified and each of these was analyzed in terms of the basis for calculating the release and a description of the currently employed control method. Alternative control technology is then discussed, along with the available capital and operating cost figures for alternative control methods

  20. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    International Nuclear Information System (INIS)

    DiNunzio, Camillo A.; Gupta, Abhinav; Golay, Michael; Luk, Vincent; Turk, Rich; Morrow, Charles; Geum-Taek Jin

    2002-01-01

    OAK-B135 This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies

  1. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    DiNunzio, Camillo A. [Framatome ANP DE& S, Marlborough, MA (United States); Gupta, Abhinav [Univ. of North Carolina, Raleigh, NC (United States); Golay, Michael [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Luk, Vincent [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Turk, Rich [Westinghouse Electric Company Nuclear Systems, Windsor, CT (United States); Morrow, Charles [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jin, Geum-Taek [Korea Power Engineering Company Inc., Yongin-si, Gyeonggi-do (Korea, Republic of)

    2002-11-30

    This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.

  2. Effect of Changes in Layout Shape on Unit Construction Cost of ...

    African Journals Online (AJOL)

    The conclusions of previous studies on the cost implication of building shape have been premised on the knowledge of building morphological and geometrical characteristics, and have lacked empirical authentication. This study used empirical data to investigate the effect of layout narrowness and complexity (irregularity) ...

  3. Local Government Planning Tool to Calculate Institutional and Engineering Control Costs for Brownfield Properties

    Science.gov (United States)

    This cost calculator is designed as a guide for municipal or local governments to assist in calculating their expected costs of implementing and conducting long-term stewardship of institutional controls and engineering controls at brownfield properties.

  4. Obesity impact on the attentional cost for controlling posture.

    Directory of Open Access Journals (Sweden)

    Jean-Baptiste Mignardot

    2010-12-01

    Full Text Available This study investigated the effects of obesity on attentional resources allocated to postural control in seating and unipedal standing.Ten non obese adults (BMI = 22.4±1.3, age = 42.4±15.1 and 10 obese adult patients (BMI = 35.2±2.8, age = 46.2±19.6 maintained postural stability on a force platform in two postural tasks (seated and unipedal. The two postural tasks were performed (1 alone and (2 in a dual-task paradigm in combination with an auditory reaction time task (RT. Performing the RT task together with the postural one was supposed to require some attentional resources that allowed estimating the attentional cost of postural control. 4 trials were performed in each condition for a total of 16 trials.(1 Whereas seated non obese and obese patients exhibited similar centre of foot pressure oscillations (CoP, in the unipedal stance only obese patients strongly increased their CoP sway in comparison to controls. (2 Whatever the postural task, the additional RT task did not affect postural stability. (3 Seated, RT did not differ between the two groups. (4 RT strongly increased between the two postural conditions in the obese patients only, suggesting that body schema and the use of internal models was altered with obesity.Obese patients needed more attentional resources to control postural stability during unipedal stance than non obese participants. This was not the case in a more simple posture such as seating. To reduce the risk of fall as indicated by the critical values of CoP displacement, obese patients must dedicate a strong large part of their attentional resources to postural control, to the detriment of non-postural events. Obese patients were not able to easily perform multitasking as healthy adults do, reflecting weakened psycho-motor abilities.

  5. Obesity Impact on the Attentional Cost for Controlling Posture

    Science.gov (United States)

    Mignardot, Jean-Baptiste; Olivier, Isabelle; Promayon, Emmanuel; Nougier, Vincent

    2010-01-01

    Background This study investigated the effects of obesity on attentional resources allocated to postural control in seating and unipedal standing. Methods Ten non obese adults (BMI = 22.4±1.3, age = 42.4±15.1) and 10 obese adult patients (BMI = 35.2±2.8, age = 46.2±19.6) maintained postural stability on a force platform in two postural tasks (seated and unipedal). The two postural tasks were performed (1) alone and (2) in a dual-task paradigm in combination with an auditory reaction time task (RT). Performing the RT task together with the postural one was supposed to require some attentional resources that allowed estimating the attentional cost of postural control. 4 trials were performed in each condition for a total of 16 trials. Findings (1) Whereas seated non obese and obese patients exhibited similar centre of foot pressure oscillations (CoP), in the unipedal stance only obese patients strongly increased their CoP sway in comparison to controls. (2) Whatever the postural task, the additional RT task did not affect postural stability. (3) Seated, RT did not differ between the two groups. (4) RT strongly increased between the two postural conditions in the obese patients only, suggesting that body schema and the use of internal models was altered with obesity. Interpretation Obese patients needed more attentional resources to control postural stability during unipedal stance than non obese participants. This was not the case in a more simple posture such as seating. To reduce the risk of fall as indicated by the critical values of CoP displacement, obese patients must dedicate a strong large part of their attentional resources to postural control, to the detriment of non-postural events. Obese patients were not able to easily perform multitasking as healthy adults do, reflecting weakened psycho-motor abilities. PMID:21187914

  6. Autonomous Space Object Catalogue Construction and Upkeep Using Sensor Control Theory

    Science.gov (United States)

    Moretti, N.; Rutten, M.; Bessell, T.; Morreale, B.

    The capability to track objects in space is critical to safeguard domestic and international space assets. Infrequent measurement opportunities, complex dynamics and partial observability of orbital state makes the tracking of resident space objects nontrivial. It is not uncommon for human operators to intervene with space tracking systems, particularly in scheduling sensors. This paper details the development of a system that maintains a catalogue of geostationary objects through dynamically tasking sensors in real time by managing the uncertainty of object states. As the number of objects in space grows the potential for collision grows exponentially. Being able to provide accurate assessment to operators regarding costly collision avoidance manoeuvres is paramount; the accuracy of which is highly dependent on how object states are estimated. The system represents object state and uncertainty using particles and utilises a particle filter for state estimation. Particle filters capture the model and measurement uncertainty accurately, allowing for a more comprehensive representation of the state’s probability density function. Additionally, the number of objects in space is growing disproportionally to the number of sensors used to track them. Maintaining precise positions for all objects places large loads on sensors, limiting the time available to search for new objects or track high priority objects. Rather than precisely track all objects our system manages the uncertainty in orbital state for each object independently. The uncertainty is allowed to grow and sensor data is only requested when the uncertainty must be reduced. For example when object uncertainties overlap leading to data association issues or if the uncertainty grows to beyond a field of view. These control laws are formulated into a cost function, which is optimised in real time to task sensors. By controlling an optical telescope the system has been able to construct and maintain a catalogue

  7. Multi-model-based Access Control in Construction Projects

    Directory of Open Access Journals (Sweden)

    Frank Hilbert

    2012-04-01

    Full Text Available During the execution of large scale construction projects performed by Virtual Organizations (VO, relatively complex technical models have to be exchanged between the VO members. For linking the trade and transfer of these models, a so-called multi-model container format was developed. Considering the different skills and tasks of the involved partners, it is not necessary for them to know all the models in every technical detailing. Furthermore, the model size can lead to a delay in communication. In this paper an approach is presented for defining model cut-outs according to the current project context. Dynamic dependencies to the project context as well as static dependencies on the organizational structure are mapped in a context-sensitive rule. As a result, an approach for dynamic filtering of multi-models is obtained which ensures, together with a filtering service, that the involved VO members get a simplified view of complex multi-models as well as sufficient permissions depending on their tasks.

  8. Autogenous Crack Control during Construction Phases of MOSE Venice Dams

    Science.gov (United States)

    Bertagnoli, Gabriele; Anerdi, Constanza; Malavisi, Marzia; Zoratto, Nadia

    2017-10-01

    The design of concrete structures exposed to severe environmental attack, like in marine environment, requires serious attention for concrete durability. Early age cracking due to autogenous deformations can be detrimental to the performance of tidal structures. The study of the structural effects of hydration heat and rheological behaviour of a set of huge concrete structures of the Mobile Venice Dams known with the MOSE acronym (Experimental Electromechanical Module) is presented in this paper. Together with other measures such as coastal reinforcement, the raising of quaysides, and the paving and improvement of the lagoon, MOSE is designed to protect Venice and the lagoon from tides of up to 3 meters. Construction began simultaneously in 2003 at all three lagoon inlets, and the project has been completed in 2014. Floods have caused damage since ancient times and have become more frequent and intense as a result of the combined effect of eustatism (a rise in sea level) and subsidence (a drop in land level) caused by natural and man-induced phenomena. Nowadays, towns and villages in the lagoon are about 23 cm lower with respect to the water level than at the beginning of the 1900s. Each year, floods can cause serious problems for the inhabitants as well as deterioration of architecture, urban structures and the ecosystem. Over the entire lagoon area, there is also a constant risk of a catastrophic event such as that of 4 November 1966, when a tide of 194 cm submerged Venice, Chioggia and the other built-up areas.

  9. Control and operation cost optimization of the HISS cryogenic system

    International Nuclear Information System (INIS)

    Porter, J.; Bieser, F.; Anderson, D.

    1983-08-01

    The Heavy Ion Spectrometer System (HISS) relies upon superconducting coils of cryostable design to provide a maximum particle bending field of 3 tesla. A previous paper describes the cryogenic facility including helium refrigeration and gas management. This paper discusses a control strategy which has allowed full time unattended operation, along with significant nitrogen and power cost reductions. Reduction of liquid nitrogen consumption has been accomplished by making use of the sensible heat available in the cold exhaust gas. Measured nitrogen throughput agrees with calculations for sensible heat utilization of zero to 70%. Calculated consumption saving over this range is 40 liters per hour for conductive losses to the supports only. The measured throughput differential for the total system is higher

  10. Operation Cost Minimization of Droop-Controlled AC Microgrids Using Multiagent-Based Distributed Control

    DEFF Research Database (Denmark)

    Li, Chendan; Savaghebi, Mehdi; Guerrero, Josep M.

    2016-01-01

    on the power rating of the power converters. With various primary source for the distributed generator (DG), factors that are closely related to the operation cost, such as fuel cost of the generators and losses should be taken into account in order to improve the efficiency of the whole system. In this paper......, a multiagent-based distributed method is proposed to minimize the operation cost in AC microgrids. In the microgrid, each DG is acting as an agent which regulates the power individually using a novel power regulation method based on frequency scheduling. An optimal power command is obtained through carefully...... designed consensus algorithm by using sparse communication links only among neighbouring agents. Experimental results for different cases verified that the proposed control strategy can effectively reduce the operation cost....

  11. On the Controllability Principles and the Construction of Uncontrollability

    DEFF Research Database (Denmark)

    Friis, Ivar; Gevoll, Linn; Hansen, Allan

    A key challenge when it comes to coping with the controllability principle is to understand why and how uncontrollability occurs. In this paper we draw on the Actor-Network Theory to provide more insight to why and how uncontrollability emerges in organizations. By means of an in-depth case study...... of a wide range of heterogeneous actors that connects in multiple ways and that in combination forms a complex network of relations which affect delivery time performance. Our study adds to research on the controllability principle. Whereas prior research has characterized uncontrollability as determined...... uncontrollability more specifically is about. Thus, our study adds to as well as elaborates on prior research. We illustrate how uncontrollability arise in the intersects of several heterogeneous elements such as the product information systems, quality management, incentive systems, outsourcing and customers. We...

  12. Quality control of three main materials for civil construction of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Feng

    2011-01-01

    The construction and operation of nuclear power plant is a systematic engineering. To ensure quality and safety of nuclear power plants, each work from design to operation can have certain impact on the quality and safety of the project. The quality of each related work shall be controlled. Starting from the quality control over raw materials for the civil construction of nuclear power plant, this article mainly analyzes how to control the quality and manage the three main materials of steel, concrete and modular parts in the civil construction. (author)

  13. Costs in the agricultural enterprises in connection with controlling system

    OpenAIRE

    Lenka Hudáková Stašová

    2007-01-01

    We analyse the development of total own costs in two formed sets of agricultural enterprises in this paper. We compare the analysis in both sets and we specify an important problem which results from the analysis – high total own costs. We propose the alternative of the allocation precising of total own costs for products by using the Activity Based Costing Method instead of traditional calculation methods own costs. The principle of this Method lies in double-stage allocation of the own cost...

  14. Design and Construction of an Autonomous Low-Cost Pulse Height Analyzer and a Single Channel Analyzer for Moessbauer Spectroscopy

    International Nuclear Information System (INIS)

    Velasquez, A.A.; Trujillo, J.M.; Morales, A.L.; Tobon, J.E.; Gancedo, J.R.; Reyes, L.

    2005-01-01

    A multichannel analyzer (MCA) and a single channel-analyzer (SCA) for Moessbauer spectrometry application have been designed and built. Both systems include low-cost digital and analog components. A microcontroller manages, either in PHA or MCS mode, the data acquisition, data storage and setting of the pulse discriminator limits. The user can monitor the system from an external PC through the serial port with the RS232 communication protocol. A graphic interface made with the LabVIEW software allows the user to adjust digitally the lower and upper limits of the pulse discriminator, and to visualize as well as save the PHA spectra in a file. The system has been tested using a 57Co radioactive source and several iron compounds, yielding satisfactory results. The low cost of its design, construction and maintenance make this equipment an attractive choice when assembling a Moessbauer spectrometer

  15. Integrated risk management for improving internal traffic control, work-zone safety, and mobility during major construction.

    Science.gov (United States)

    2012-10-01

    Highway construction is among the most dangerous industries in the US. Internal traffic control design, along with how construction : equipment and vehicles interact with the traveling public, have a significant effect on how safe a highway construct...

  16. Social construction of stormwater control measures in Melbourne and Copenhagen:

    DEFF Research Database (Denmark)

    Madsen, Herle Mo; Brown, Rebekah; Elle, Morten

    2017-01-01

    Urban stormwater systems in cities around the world are challenged by urbanization and climate change, and a range of Stormwater Control Measures (SCMs) are being implemented as solutions to these challenges. We developed a conceptual framework of technological stabilization based on Social...... differences in their application due to different physical, organizational and cultural contexts in the two cities, drought being the main driver during the past decade in Melbourne (1997–2010) and pluvial flooding in Copenhagen (2007-). In Melbourne there is currently a strong integrated understanding...

  17. X ray diffraction. Applications to construction quality control

    Directory of Open Access Journals (Sweden)

    Triviño Vázquez, F.

    1974-09-01

    Full Text Available Not availableLa aplicación de la difracción de los rayos X a la técnica analítica supuso, en su día, un avance considerable en el arduo y casi siempre laborioso problema de la investigación cuali y cuantitativa de los componentes de una muestra. El no ser un método destructivo, la pequeña cantidad de muestra y la rapidez que aportan los sistemas electrónicos de registro, convierten a esta técnica en un poderoso instrumento de análisis y de control.

  18. Application of grey system theory to construction control for prestressed concrete continuous bridge

    NARCIS (Netherlands)

    Yu, Q.; Lu, Zhean; Wang, Juanjuan

    2006-01-01

    Text in Chinese. - This paper discussed the application of the grey system theory for the construction control of bridges on the background of the construction of Fuhe Bridge in Huangpi county, Hubei province. The GM( 1,1) model was the most representative and widely applied grey prognosticate model

  19. The construction of distant total distributed measuring and controlling system based on RS-232 communication

    International Nuclear Information System (INIS)

    Shi Chengying; Li Tiantuo; Zhu Wenkai; Zhang Quanhu

    1999-01-01

    The author discusses the construction of distant total distributed measuring and controlling system based on RS-232 communication. The merits of this system are simple construction, reliable performance, big communication distance, and wide covering range. The system fits in with application in radiation environment. The author also discusses the system's hardware equipment and communication protocol

  20. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  1. Development of MCESC software for selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd [Civil Engineering Universiti Tenaga Nasional, Kajan, Selangor (Malaysia); Desa, Mohamed Nor Mohamed; Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malaysia, Bangi, Selangor (Malaysia)

    2012-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited into the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper aims to develop and apply Multi Criteria Analysis (MCA) software called Multi Criteria Erosion and Sediment Control (MCESC) software in which it can be applied in selecting the best stormwater control measure by depending on specified criteria and criterion weight. Visual Basic 6 was adopted as a development tool. This software can help the engineers, contractors on site and decision makers to find the best stormwater control measure in any construction site in Malaysia. Users of the MCESC software are given the opportunity to select the best stormwater control measure via expert's judgments that are built in the system or via their own expertise. MCESC software has many benefits since the experts are not always available and the consultancy is a costly issue which add further financial allocations to the project.

  2. Experience in statistical quality control for road construction in South Africa

    CSIR Research Space (South Africa)

    Mitchell, MF

    1977-06-01

    Full Text Available of statistically oriented acceptance control procedures to a major road construction project is examined and it is concluded that such procedures promise to be of benefit to both the client and the contractor....

  3. MONITORING AND CONTROLLING ON SURFACE SETTLEMENT IN SAND AND GRAVEL STRATA CAUSED BY SUBWAY STATION CONSTRUCTION APPLYING PIPE-ROOF PRE-CONSTRUCTION METHOD (PPM

    Directory of Open Access Journals (Sweden)

    Xian Yang

    2017-07-01

    Full Text Available Pipe-roof Pre-construction Method (PPM is regarded as a safer method to construct underground space, especially suitable for the construction sites with dense surface buildings, underground pipelines and complicated geological conditions. Xinleyizhi Station of Shenyang Metro constructed by PPM. In order to ensure safety in construction, the whole construction process was closely monitored. In this paper, monitoring results of surface settlement in PPM is analyzed. According to the monitoring results, the most serious settlement occurred in pipes jacking, which was the first and the most crucial step in PPM. The settlement reasons in each step are discussed, and controlling methods of surface settlement in each step are elaborated. Through close monitoring and timely control, the construction of Xinleyizhi Station completed smoothly. Because of the obvious advantages of PPM, the method will be used more widely in construction of shallow buried excavation under complicated surrounding and geological conditions.

  4. 49 CFR 192.476 - Internal corrosion control: Design and construction of transmission line.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Internal corrosion control: Design and... STANDARDS Requirements for Corrosion Control § 192.476 Internal corrosion control: Design and construction... the risk of internal corrosion. At a minimum, unless it is impracticable or unnecessary to do so, each...

  5. Construction and direct electrochemistry of orientation controlled laccase electrode.

    Science.gov (United States)

    Li, Ying; Zhang, Jiwei; Huang, Xirong; Wang, Tianhong

    2014-03-28

    A laccase has multiple redox centres. Chemisorption of laccases on a gold electrode through a polypeptide tag introduced at the protein surface provides an isotropic orientation of laccases on the Au surface, which allows the orientation dependent study of the direct electrochemistry of laccase. In this paper, using genetic engineering technology, two forms of recombinant laccase which has Cys-6×His tag at the N or C terminus were generated. Via the Au-S linkage, the recombinant laccase was assembled orientationally on gold electrode. A direct electron transfer and a bioelectrocatalytic activity toward oxygen reduction were observed on the two orientation controlled laccase electrodes, but their electrochemical behaviors were found to be quite different. The orientation of laccase on the gold electrode affects both the electron transfer pathway and the electron transfer efficiency of O2 reduction. The present study is helpful not only to the in-depth understanding of the direct electrochemistry of laccase, but also to the development of laccase-based biofuel cells. Copyright © 2014 Elsevier Inc. All rights reserved.

  6. Economic and ecological assessment of impact of construction and operation of nuclear power plant as large capital construction project with respect to control of national economy development

    International Nuclear Information System (INIS)

    Bucek, M.

    1984-01-01

    The evaluation of costs and environmental impacts of the construction and operation of nuclear power plants is concentrated into two problem areas: 1. the calculation of capital and operation costs for the prevention and minimization of envirommental damage and restoration of the environment, 2. the calculation of damage to the environment of nuclear power plant construction and operation. The ecological cost benefit of capital costs is assessed. In Czechoslovakia there does not exist any method for converting cost effectiveness of investments into environmental protection. This problem is incorporated in the general method of assessing capital cost benefit. The relations are given for total socio-economic capital cost benefit and cost benefit of investments into environmental protection. Ecological investment is not exempted from the investment fund and from the point of view of content may be devided into net and gross ecological investment and from the point of view of time into preventive and compensation ecological investment. In the USSR the method has beem developed of the ecological and economic evaluation of projects for the construction and reconstruction of production units which proceeds from the evaluation of the negative environmental impact of wastes. The basic relations are given of the benefit of ecological investments. (E.S.)

  7. Salt marsh construction costs and shrimp production in Galveston Bay and Gulf of Mexico from 1999-01-01 to 2005-01-01 (NCEI Accession 0161218)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains marsh construction cost in relation to shrimp yield per year. This modeling approach provides estimates of total annual shrimp production from...

  8. Exercise, Manual Therapy, and Booster Sessions in Knee Osteoarthritis: Cost-Effectiveness Analysis From a Multicenter Randomized Controlled Trial.

    Science.gov (United States)

    Bove, Allyn M; Smith, Kenneth J; Bise, Christopher G; Fritz, Julie M; Childs, John; Brennan, Gerard P; Abbott, J Haxby; Fitzgerald, G Kelley

    2018-01-01

    Limited information exists regarding the cost-effectiveness of rehabilitation strategies for individuals with knee osteoarthritis (OA). The study objective was to compare the cost-effectiveness of 4 different combinations of exercise, manual therapy, and booster sessions for individuals with knee OA. This economic evaluation involved a cost-effectiveness analysis performed alongside a multicenter randomized controlled trial. The study took place in Pittsburgh, Pennsylvania; Salt Lake City, Utah; and San Antonio, Texas. The study participants were 300 individuals taking part in a randomized controlled trial investigating various physical therapy strategies for knee OA. Participants were randomized into 4 treatment groups: exercise only (EX), exercise plus booster sessions (EX+B), exercise plus manual therapy (EX+MT), and exercise plus manual therapy and booster sessions (EX+MT+B). For the 2-year base case scenario, a Markov model was constructed using the United States societal perspective and a 3% discount rate for costs and quality-adjusted life years (QALYs). Incremental cost-effectiveness ratios were calculated to compare differences in cost per QALY gained among the 4 treatment strategies. In the 2-year analysis, booster strategies (EX+MT+B and EX+B) dominated no-booster strategies, with both lower health care costs and greater effectiveness. EX+MT+B had the lowest total health care costs. EX+B cost ${\\$}$1061 more and gained 0.082 more QALYs than EX+MT+B, for an incremental cost-effectiveness ratio of ${\\$}$12,900/QALY gained. The small number of total knee arthroplasty surgeries received by individuals in this study made the assessment of whether any particular strategy was more successful at delaying or preventing surgery in individuals with knee OA difficult. Spacing exercise-based physical therapy sessions over 12 months using periodic booster sessions was less costly and more effective over 2 years than strategies not containing booster sessions for

  9. Construction method and application of 3D velocity model for evaluation of strong seismic motion and its cost performance

    International Nuclear Information System (INIS)

    Matsuyama, Hisanori; Fujiwara, Hiroyuki

    2014-01-01

    Based on experiences of making subsurface structure models for seismic strong motion evaluation, the advantages and disadvantages in terms of convenience and cost for several methods used to make such models were reported. As for the details, gravity and micro-tremor surveys were considered to be highly valid in terms of convenience and cost. However, stratigraphy and seismic velocity structure are required to make accurate 3-D subsurface structures. To realize these, methods for directly examining subsurface ground or using controlled tremor sources (at high cost) are needed. As a result, it was summarized that in modeling subsurface structures, some sort of plan including both types of methods is desirable and that several methods must be combined to match one's intended purposes and budget. (authors)

  10. Competitive pricing and the challenge of cost control in medicare.

    Science.gov (United States)

    Coulam, Robert F; Feldman, Roger D; Dowd, Bryan E

    2011-08-01

    The Medicare program faces a serious challenge: it must find ways to control costs but must do so through a system of congressional oversight that necessarily limits its choices. We look at one approach to prudent purchasing - competitive pricing - that Medicare has attempted many times and in various ways since the beginning of the program, and in all but one case unsuccessfully due to the politics of provider opposition working through Congress and the courts. We look at some related efforts to change Medicare pricing to explore when the program has been successful in making dramatic changes in how it pays for health care. A set of recommendations emerges for ways to respond to the impediments of law and politics that have obstructed change to more efficient payment methods. Except in unusual cases, competitive pricing threatens too many stakeholders in too many ways for key political actors to support it. But an unusual case may arise in the coming Medicare fiscal crisis, a crisis related in part to the prices Medicare pays. At that point, competitive pricing may look less like a problem and more like a solution coming at a time when the system badly needs one.

  11. Value Engineering. "A Working Tool for Cost Control in the Design of Educational Facilities."

    Science.gov (United States)

    Lawrence, Jerry

    Value Engineering (VE) is a cost optimizing technique used to analyze design quality and cost-effectiveness. The application of VE procedures to the design and construction of school facilities has been adopted by the state of Washington. By using VE, the optimum value for every life cycle dollar spent on a facility is obtained by identifying not…

  12. Prevention program at construction worksites aimed at improving health and work ability is cost-saving to the employer: Results from an RCT

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Bosmans, J.E.; Dongen, J.M. van; Bongers, P.M.; Beek, A.J. van der; Blatter, B.M.

    2014-01-01

    Background: To prolong sustainable healthy working lives of construction workers, a prevention program was developed which aimed to improve the health and work ability of construction workers. The objective of this study was to analyze the cost-effectiveness and financial return from the employers'

  13. Operation Cost Minimization of Droop-Controlled AC Microgrids Using Multiagent-Based Distributed Control

    Directory of Open Access Journals (Sweden)

    Chendan Li

    2016-09-01

    Full Text Available Recently, microgrids are attracting increasing research interest as promising technologies to integrate renewable energy resources into the distribution system. Although many works have been done on droop control applied to microgrids, they mainly focus on achieving proportional power sharing based on the power rating of the power converters. With various primary source for the distributed generator (DG, factors that are closely related to the operation cost, such as fuel cost of the generators and losses should be taken into account in order to improve the efficiency of the whole system. In this paper, a multiagent-based distributed method is proposed to minimize the operation cost in AC microgrids. In the microgrid, each DG is acting as an agent which regulates the power individually using a novel power regulation method based on frequency scheduling. An optimal power command is obtained through carefully designed consensus algorithm by using sparse communication links only among neighbouring agents. Experimental results for different cases verified that the proposed control strategy can effectively reduce the operation cost.

  14. Design and construction of stepper motor controller for brachy-therapy equipment

    International Nuclear Information System (INIS)

    Ahmad Rifai; Usep Setia Gunawan; Indarzah Masbatin Putra

    2011-01-01

    Based on a microcontroller, a stepper motor controller for brachy-therapy equipment has been designed and prototyped. The embedded control program routine and its other associated routines enable the microcontroller to generate required pulses via external commands for stepper motor based position control. The controller receives ASCII text command via a serial port. The constructed algorithm implements the widely used method that allows motor to rotate in three phases, i.e: acceleration, constant speed, and deceleration. (author)

  15. Formalized description of assessment procedures of tender offers (of the construction organizer and contracting companies in case of engineering control scheme

    Directory of Open Access Journals (Sweden)

    Sborshchikov Sergey Borisovich

    2016-10-01

    Full Text Available The procedure of evaluating and selecting tender offers is not only an important element of the control system of investment and construction activity but is also an effective tool to increase its efficiency due to optimization of construction works price, reduction of their duration, stimulating innovations in the production, increasing the quality and engineering safety of construction production. At the recent time when new organizational forms and control schemes of investment and construction activity are appearing the system of competitive bidding gains more importance and new functions, because the choice of construction organizer and contracting companies directly influences the results of the construction. The authors consider the task of selecting the bidders’ offers which is a multicriterion task. The offers are evaluated according to the set of parameters reflecting the effectiveness of investment and construction projects. The criteria selection is based on the fact that the proposals of the organizer of construction and the contractors are related to the cost of works and to the deadlines which directly affects the implementation parameters of investment and construction projects.

  16. An Introduction to the Cost of Engineering and Institutional Controls at Brownfield Properties

    Science.gov (United States)

    This fact sheet introduces and explores the costs of site cleanup and, where cleanup leaves site contamination that restricts reuse, outlines the engineering and institutional controls and their monitoring and maintenance costs over a longer time frame.

  17. Case study of the effects of public safety regulation on the construction costs of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.D.

    1987-01-01

    Regulations intended to reduce the number of accidents at nuclear plants and the discharge of sulfur and particulate wastes at coal-fired power plants have become an important cause of construction cost escalation. Measuring the costs of these regulatory interventions is a difficult research task. The three-unit Bruce Mansfield coal-fired plant and the two-unit Beaver Valley nuclear power station located in Shippingport, Pennsylvania, provide a unique opportunity for a case study of the costs of regulation in the construction of both kinds of plants. The units of each plant were built sequentially over a period of intensifying regulation. The method used to measure the costs of public safety regulation in the construction of each kind of plant is to determine the connections between the issuances of the regulatory agencies (EPA and NRC) and cost escalations of succeeding units. The small cost escalations of the Mansfield 3 unit, in comparison to the massive costs of the Beaver Valley 2 unit, suggest that the design and construction of new coal-fired plants are not disrupted by regulatory interventions nearly as extensively as are nuclear units. Certain technical features of Beaver Valley 2, especially its small size and a design that is identical to the first unit's, further contribute to its cost escalations

  18. Cost-effectiveness of trachoma control in seven world regions.

    NARCIS (Netherlands)

    Baltussen, R.M.P.M.; Sylla, M.; Frick, K.D.; Mariotti, S.P.

    2005-01-01

    BACKGROUND/AIMS: The fight against blinding trachoma is being addressed with an integrated strategy of surgery, antibiotics, hygiene promotion, and environmental improvement-the SAFE strategy, but its cost-effectiveness is largely unknown. This paper estimates the cost effectiveness of surgery and

  19. Problems and Concerns Regarding Access Control System Construction in Radiation Facilities Based on the NIFS Experience

    International Nuclear Information System (INIS)

    Kawano, T.; Inoue, N.; Sakuma, Y.; Motojima, O.

    2001-01-01

    Full text: In 1998, access control system for the large helical device (LHD) experimental hall was constructed and put into operation at the National Institute for Fusion Science (NIFS) in Toki, Japan. Since then, the system has been continuously improved. It now controls access into the LHD controlled area through four entrances. The system has five turnstile gates and enables control of access at the four entrances. The system is always checking whether the shielding doors are open or closed at eight positions. The details pertaining to the construction of the system were reported at IRPA-10 held in Hiroshima, Japan, in 2000. Based on our construction experience of the NIFS access control system, we will discuss problems related to software and operational design of the system. We will also discuss some concerns regarding the use of the system in radiation facilities. The problems we will present concern, among other thing, individual registration, time control, turnstile control, interlock signal control, data aggregation and transactions, automatic and manual control, and emergency procedures. For example, in relation to the time control and turnstile control functions, we will discuss the gate-opening time interval for an access event, the timing of access data recording, date changing, turn bar control, double access, and access error handling. (author)

  20. Guidelines for cost control and analysis of cost-type research and development contracts

    Science.gov (United States)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  1. Controlling for quality in the hospital cost function.

    Science.gov (United States)

    Carey, Kathleen; Stefos, Theodore

    2011-06-01

    This paper explores the relationship between the cost and quality of hospital care from the perspective of applied microeconomics. It addresses both theoretical and practical complexities entailed in incorporating hospital quality into the estimation of hospital cost functions. That literature is extended with an empirical analysis that examines the use of 15 Patient Safety Indicators (PSIs) as measures of hospital quality. A total operating cost function is estimated on 2,848 observations from five states drawn from the period 2001 to 2007. In general, findings indicate that the PSIs are successful in capturing variation in hospital cost due to adverse patient safety events. Measures that rely on the aggregate number of adverse events summed over PSIs are found to be superior to risk-adjusted rates for individual PSIs. The marginal cost of an adverse event is estimated to be $22,413. The results contribute to a growing business case for inpatient safety in hospital services.

  2. Cost-Effectiveness Analysis of Surface Flow Constructed Wetlands (SFCW) for Nutrient Reduction in Drainage Discharge from Agricultural Fields in Denmark.

    Science.gov (United States)

    Gachango, F G; Pedersen, S M; Kjaergaard, C

    2015-12-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.

  3. Cost-effectiveness analysis of surface flow constructed wetlands (SFCW) for nutrient reduction in drainage discharge from agricultural fields in Denmark

    DEFF Research Database (Denmark)

    Gachango, Florence Gathoni; Pedersen, Søren Marcus; Kjærgaard, Charlotte

    2015-01-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies......, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients...... reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW...

  4. Constructing Hotelling's T 2 control limits for different α levels of ...

    African Journals Online (AJOL)

    When the quality of a product is controlled by combinations of two or more variables, a high level decision qui-ckly determines the out of control signals, while simultaneously, evaluating the variable(s) responsible for the false alarm rate (α) levels of significance. In this connection, bootstrap algorithm for constructing ...

  5. Some principles of automated control systems construction with project organizational structure

    OpenAIRE

    Kovalenko, Ihor I.; Puhachenko, Kateryna S.

    2013-01-01

    The main principles of automated control systems construction with project organizational structures have been considered and the process flow sheet  for organizational systems control has been proposed. The architectural elements of the organizational system have been introduced and described. The instrumental tools of the graphodynamic systems theory have been used for the simulation modeling of hierarchical structures.

  6. Costing support and cost control in manufacturing. A cost estimation tool applied in the sheet metal domain.

    NARCIS (Netherlands)

    ten Brinke, E.

    2002-01-01

    In the product development cycle several engineering tasks like design, process planning and production planning have to be executed. The execution of these tasks mainly involves information processing and decision-making. Because costs is an important factor in manufacturing, adequate information

  7. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    Science.gov (United States)

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  8. A Proactive Approach for Change Management and Control on Construction Projects

    OpenAIRE

    CHEN, CHAO

    2015-01-01

    Changes on construction projects present tough and controversial issues. Change is one of the primary reasons for schedule delay and cost overrun, which create negative impact on project performance and profitability. The liability of change and its consequences are major sources of disagreements between project participants, which often lead to disputes or claims.To answer the challenge of change, both industry and academia have developed change management techniques. Many studies have touch...

  9. Design, construction and quality control of resistive-Micromegas anode boards for the ATLAS experiment

    Science.gov (United States)

    Kuger, F.; Iengo, P.

    2018-02-01

    For the upcoming upgrade of the forward muon stations of the ATLAS detector, 1280m2 of Micromegas chambers have to be constructed. The industrialization of anode board production is an essential precondition. Design and construction methods of these boards have been optimized towards mass production. In parallel quality control procedures have been developed and established. The first set of large size Micromegas anode boards has finally been produced in industries and demonstrates the feasibility of the project on full-scale.

  10. COST EFFECTIVE VOC EMISSION CONTROL STARTEGIES FOR MILITARY, AEROSPACE,AND INDUSTRIAL PAINT SPRAY BOOTH OPERATIONS: COMBINING IMPROVED VENTILATION SYSTEMS WITH INNOVATIVE, LOW COST EMISSION CONTROL TECHNOLOGIES

    Science.gov (United States)

    The paper describes a full-scale demonstration program in which several paint booths were modified for recirculation ventilation; the booth exhaust streams are vented to an innovative volatile organic compound (VOC) emission control system having extremely low operating costs. ...

  11. Theoretical and methodological aspects of assessing economic effectiveness of nuclear power plant construction using cost-benefit analysis

    International Nuclear Information System (INIS)

    Moravcik, A.

    1984-01-01

    The cost benefit of investments is devided into social and economic benefits. The postulates are discussed for the assessment of the cost benefit of capital costs of nuclear power plants. The relations are given for total cost benefit of capital costs expressed by the total profit rate of capital costs, and the absolute effectiveness exoressed by the socio-economic benefit of capital costs. The absolute cost benefit of capital costs is characterized by several complex indexes. Comparable capital cost benefit is used for assessing the effectiveness of interchangeable variants of solution. The minimum calculated costs serve as the criterion for selecting the optimal variant. (E.S.)

  12. Quality assurance and quality control of nuclear engineering during construction phase

    International Nuclear Information System (INIS)

    Zhang Zhihua; Deng Yue; Liu Yaoguang; Xu Xianqi; Zhou Shan; Qian Dazhi; Zhang Yang

    2007-01-01

    The quality assurance (QA) and quality control (QC) is a very important work in the nuclear engineering. This paper starts with how to establish quality assurance system of nuclear engineering construction phase, then introduces several experiments and techniques such as the implementation of quality assurance program, the quality assurance and quality control of contractors, the quality surveillance and control of supervisory companies, quality assurance audit and surveillance of builders. (authors)

  13. A Preliminary Investigation of Wastewater Treatment Efficiency and Economic Cost of Subsurface Flow Oyster-Shell-Bedded Constructed Wetland Systems

    Directory of Open Access Journals (Sweden)

    Chia-Chuan Hsu

    2013-06-01

    Full Text Available We conducted a preliminary investigation of wastewater treatment efficiency and economic cost of the oyster-shell-bedded constructed wetlands (CWs compared to the conventional gravel-bedded CW based on field monitoring data of water quality and numerical modeling. Four study subsurface (SSF CWs were built to receive wastewater from Taipei, Taiwan. Among these sites, two are vertical wetlands, filled with bagged- (VA and scattered- (VB oyster shells, and the other two horizontal wetlands were filled with scattered-oyster shells (HA and gravels (HB. The BOD, NO3−, DO and SS treatment efficiency of VA and VB were higher than HA and HB. However, VA was determined as the best option of CW design due to its highest cost-effectiveness in term of BOD removal (only 6.56 US$/kg as compared to VB, HA and HB (10.88–25.01 US$/kg. The results confirmed that oyster shells were an effective adsorption medium in CWs. Hydraulic design and arrangement of oyster shells could be important in determining their treatment efficiency and cost-effectiveness. A dynamic model was developed to simulate substance transmissions in different treatment processes in the CWS using AQUASIM 2.1 based on the water quality data. Feasible ranges of biomedical parameters involved were determined for characterizing the importance of different biochemical treatment processes in SSF CWs. Future work will involve extending the experimental period to confirm the treatment efficiency of the oyster-shell-bedded CW systems in long-term operation and provide more field data for the simulated model instead of the literature values.

  14. Views of US physicians about controlling health care costs.

    Science.gov (United States)

    Tilburt, Jon C; Wynia, Matthew K; Sheeler, Robert D; Thorsteinsdottir, Bjorg; James, Katherine M; Egginton, Jason S; Liebow, Mark; Hurst, Samia; Danis, Marion; Goold, Susan Dorr

    2013-07-24

    Physicians' views about health care costs are germane to pending policy reforms. To assess physicians' attitudes toward and perceived role in addressing health care costs. A cross-sectional survey mailed in 2012 to 3897 US physicians randomly selected from the AMA Masterfile. Enthusiasm for 17 cost-containment strategies and agreement with an 11-measure cost-consciousness scale. A total of 2556 physicians responded (response rate = 65%). Most believed that trial lawyers (60%), health insurance companies (59%), hospitals and health systems (56%), pharmaceutical and device manufacturers (56%), and patients (52%) have a "major responsibility" for reducing health care costs, whereas only 36% reported that practicing physicians have "major responsibility." Most were "very enthusiastic" for "promoting continuity of care" (75%), "expanding access to quality and safety data" (51%), and "limiting access to expensive treatments with little net benefit" (51%) as a means of reducing health care costs. Few expressed enthusiasm for "eliminating fee-for-service payment models" (7%). Most physicians reported being "aware of the costs of the tests/treatments [they] recommend" (76%), agreed they should adhere to clinical guidelines that discourage the use of marginally beneficial care (79%), and agreed that they "should be solely devoted to individual patients' best interests, even if that is expensive" (78%) and that "doctors need to take a more prominent role in limiting use of unnecessary tests" (89%). Most (85%) disagreed that they "should sometimes deny beneficial but costly services to certain patients because resources should go to other patients that need them more." In multivariable logistic regression models testing associations with enthusiasm for key cost-containment strategies, having a salary plus bonus or salary-only compensation type was independently associated with enthusiasm for "eliminating fee for service" (salary plus bonus: odds ratio [OR], 3.3, 99% CI, 1

  15. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  16. In search of financial sufficiency in the Spanish public university: From financing to the cost control and cost management

    Directory of Open Access Journals (Sweden)

    Santiago Aguilà

    2016-02-01

    Full Text Available Purpose: The current socio-economic context characterized by restrictive budgetary policies in the countries of the European Union has led to a reduction in public funding in the Spanish public university raising the deficit in many universities. That is why, while they are completing the implementation of a cost accounting model (Modelo Canoa to quantify their real financial needs, are also increasing academic rates with the limits established in the Decree-Law 14/2012 of 20 April as practically the only resource. This fact may ultimately affect demand. It is urgent to find therefore new sources of private funding as well as implementing techniques to control and reduce costs justified by the extreme financial situations of some universities. Design/methodology: These new sources of private funding as well as the specific techniques of control and cost management that are used in public universities outside of Spain are described. It has also made a poll to the managers of the Spanish public universities considering the diversification of funding sources and the feasibility of adopting specific techniques of control and cost management to help the achievement of financial sufficiency. Findings: Especially in the US universities, financing is more diversified and not depend so much of the increase in public rates. Specific techniques of control and cost management are also used and they are applicable to the Spanish case according to the opinion of the managers. Research limitations/implications: 82% of managers have completed the proposed poll. Originality/value: Identifying sources of private funding and specific techniques of control and cost management applicable to the Spanish public universities.

  17. ANALYSIS OF QUALITY COSTS FOR STATISTICA QUALITY CONTROL PLANNING

    Directory of Open Access Journals (Sweden)

    N. Chiadamrong

    2017-12-01

    Full Text Available Quality has become one or the most important force leading to organizational success and company growth in national and international markets. The return-on-investment from strong and effective quality programs is providing excellent profitability results in firms with effective quality strategies. Due to the wide variation in quality results, the search for the genuine keys to success in quality has become a matter of deep concern to management of companies. This paper suggests a way to quantifying quality costs. As a result, the appropriate quality strategies can be adjusted and set to match with each company situation based on the categorization of the quality costs suggested. This outcome can, then, be used as a guideline for manufactures in setting their suitable quality program, which establishes the proper balance between the costs and customer services.

  18. Alliancing process helps BP control Prudhoe Bay costs

    International Nuclear Information System (INIS)

    Darley, J.R.

    1992-01-01

    Production and revenues from America's largest oil field are declining. The cost of operating it is rising. If both trends were to continue unchecked, oil production at Prudhoe Bay on Alaska's North Slope could become uneconomic in the next decade. Simply maintaining operating expenditures at current levels - barring a dramatic, lasting increase in oil prices - would postpone the day of reckoning by only a few years. Despite ongoing investments in tempering the decline - gas and water handling expansions, development drilling, enhanced oil recovery, and well maintenance and repair programs - production will continue to decline. That's why it's imperative we reverse the tide of rising costs. This paper reports that to continue to produce oil at Prudhoe well into the 21st century, we must immediately - and continually - cut costs to reflect declining production and revenues

  19. Strategies to reduce safety violations for working from heights in construction companies: study protocol for a randomized controlled trial.

    Science.gov (United States)

    van der Molen, Henk F; Frings-Dresen, Monique H W

    2014-05-31

    Safety measures should be applied to reduce work-related fatal and non-fatal fall injuries. However, according to the labor inspectorate, more than 80% of Dutch construction sites violate safety regulations for working from heights. To increase compliance with safety regulations, employers and workers have to select, implement and monitor safety measures. To facilitate this behavioral change, stimulating knowledge awareness and personalized feedback are frequently advocated behavior change techniques. For this study, two behavior change strategies have been developed in addition to the announcement of safety inspections by the labor inspectorate. These strategies consist of 1) face-to-face contacts with safety consultants and 2) direct mail with access to internet facilities. The objective of this study is to evaluate the effectiveness of these two strategies on the safety violations for working from heights, the process and the cost measures. This study is a block randomized intervention trial in 27 cities to establish the effects of the face-to-face guidance strategy (N = 9), a direct mailing strategy (N = 9) and a control condition of no guidance (N = 9) on safety violations to record by labor inspectors after three months. A process evaluation for both strategies will be performed to determine program implementation (reach, dose delivered and dose received), satisfaction, knowledge and perceived safety behavior. A cost analysis will be performed to establish the financial costs for both strategies. The present study is in accordance with the CONSORT statement. This study increases insight into performing practice-based randomized controlled trials. The outcome will help to evaluate the effect of two guidance strategies on safety violations. If these strategies are effective, implementation of these strategies through the national institute of safety and health or labor inspectorate can take place to guide construction companies in complying with

  20. Influence of the cost development in power station construction and operation on power station planning with special regard to the effects on electricity supply

    International Nuclear Information System (INIS)

    Krieb, K.H.; Frenzel, P.; Vogel, J.

    1974-01-01

    A survey on the present structure of thermal power facilities in the FRG is followed by a discussion of the development of power plant costs in the last few years. Also mentioned are the findings of studies of costs as a function of the power station size and the effects of the overall cost increase on the power generation costs of the last few years. Finally, a model conception for the development of power stations is presented which makes predictions about the future size of power stations and their constructional parts. (UA/AK) [de

  1. A framework of initiatives for successful application of life cycle costing (LCC in industrialised building system (IBS in Malaysian construction industry

    Directory of Open Access Journals (Sweden)

    Shamsuddin Siti Mazzuana

    2017-01-01

    Full Text Available Industrialised Building System (IBS contributes a great shift in sustainable construction and benefits the society. Previous studies have proven in general that one of the hindrances in promoting sustainable in IBS, is a high cost for any pre-cast material specifically thus effected the overall cost. The introduction of Life Cycle Costing (LCC leads into providing a better and comprehensive cost estimation, including projecting actual cost to operate the building, hence providing a better baseline for decision making. The lacking application of LCC in IBS is still in trivial impact, therefore, this paper presents a framework which produced by expressing the successful initiatives of LCC and IBS in Malaysia construction industry. The framework developed based on findings from the extensive literature reviews, 164 responded questionnaires, and 19 expert opinions, which has three sections: Strategy Development, System Development and the last part is Decision Level. Aspects of objectivity, practicality, reliability, completeness that were likely to be implemented in the Malaysian construction industry were used. There are significant opinions on the usefulness and completeness of the proposed framework in providing a comprehensive cost estimates which helps much in deciding to carry out IBS or remain with a traditional construction method.

  2. User Delay Cost Model and Facilities Maintenance Cost Model for a Terminal Control Area : Volume 1. Model Formulation and Demonstration

    Science.gov (United States)

    1978-05-01

    The User Delay Cost Model (UDCM) is a Monte Carlo computer simulation of essential aspects of Terminal Control Area (TCA) air traffic movements that would be affected by facility outages. The model can also evaluate delay effects due to other factors...

  3. New Zealand cuts health spending to control costs

    OpenAIRE

    2010-01-01

    New Zealand’s health-care system is undergoing a series of cutbacks to reduce costs, but critics are concerned that the health of people on low incomes and in some population groups may suffer. Rebecca Lancashire reports in our series on health financing.

  4. Got Risk? Using Risk Transfers to Control Costs

    Science.gov (United States)

    Bambino, Robert

    2010-01-01

    For public school districts, risk financing is the financial outlay associated with litigation, such as settlements, verdicts, and the cost of legal defense. Even when districts purchase insurance to finance risk, a viable risk transfer program can still benefit districts in different ways: (1) Liability policies are generally experience-rated;…

  5. Recall costs balanced against spoilage control in Dutch custard.

    Science.gov (United States)

    Velthuis, A G J; Reij, M W; Baritakis, K; Dang, M; van Wagenberg, C P A

    2010-06-01

    The relation between the moment at which a recall of Dutch custard is initiated and the direct costs of this recall was investigated. A simulation model of the custard supply chain was developed to compare scenarios with and without a quarantine of 48 h at the storage of the production plant. The model consists of 3 parts: 1) the distribution of a 24,000-L batch of custard over the supply chain over time is simulated; 2) the time to detect spoilage bacteria with a recontamination test procedure is simulated; and 3) the direct recall costs of custard over the different parts of the supply chain are calculated. Direct recall costs increase from about 25,000 euros/batch to 36,171 euros/batch from 57 to 135 h in the situation without quarantine and from 25,000 euros/batch to 36,648 euros/batch from 123 h to 163 h for the situation with quarantine. Then costs decrease because more and more custard is at the consumer level and only 0.13% of the consumers will ask for a refund. With low true contamination probabilities quarantine is not profitable, but at later detection moments with high probabilities it is. We conclude that a simulation model is a helpful tool to evaluate the efficiency of risk management strategies like end product testing and a quarantine situation. 2010 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  6. Regulating the Dutch pharmaceutical market: improving efficiency or controlling costs?

    NARCIS (Netherlands)

    Wolf, de P.; Brouwer, W.B.F.; Rutten, F.H.

    2005-01-01

    In this paper, we describe the Dutch pharmaceutical market, which is heavily regulated by the government. Through the regulation of prices and promoting prudent use, the Dutch government tries to bring down the cost of pharmaceuticals, which increases every year at a higher rate than total health

  7. Costs analysis of a population level rabies control programme in Tamil Nadu, India.

    Directory of Open Access Journals (Sweden)

    Syed Shahid Abbas

    2014-02-01

    Full Text Available The study aimed to determine costs to the state government of implementing different interventions for controlling rabies among the entire human and animal populations of Tamil Nadu. This built upon an earlier assessment of Tamil Nadu's efforts to control rabies. Anti-rabies vaccines were made available at all health facilities. Costs were estimated for five different combinations of animal and human interventions using an activity-based costing approach from the provider perspective. Disease and population data were sourced from the state surveillance data, human census and livestock census. Program costs were extrapolated from official documents. All capital costs were depreciated to estimate annualized costs. All costs were inflated to 2012 Rupees. Sensitivity analysis was conducted across all major cost centres to assess their relative impact on program costs. It was found that the annual costs of providing Anti-rabies vaccine alone and in combination with Immunoglobulins was $0.7 million (Rs 36 million and $2.2 million (Rs 119 million, respectively. For animal sector interventions, the annualised costs of rolling out surgical sterilisation-immunization, injectable immunization and oral immunizations were estimated to be $ 44 million (Rs 2,350 million, $23 million (Rs 1,230 million and $ 11 million (Rs 590 million, respectively. Dog bite incidence, health systems coverage and cost of rabies biologicals were found to be important drivers of costs for human interventions. For the animal sector interventions, the size of dog catching team, dog population and vaccine costs were found to be driving the costs. Rabies control in Tamil Nadu seems a costly proposition the way it is currently structured. Policy makers in Tamil Nadu and other similar settings should consider the long-term financial sustainability before embarking upon a state or nation-wide rabies control programme.

  8. Costs analysis of a population level rabies control programme in Tamil Nadu, India.

    Science.gov (United States)

    Abbas, Syed Shahid; Kakkar, Manish; Rogawski, Elizabeth Tacket

    2014-02-01

    The study aimed to determine costs to the state government of implementing different interventions for controlling rabies among the entire human and animal populations of Tamil Nadu. This built upon an earlier assessment of Tamil Nadu's efforts to control rabies. Anti-rabies vaccines were made available at all health facilities. Costs were estimated for five different combinations of animal and human interventions using an activity-based costing approach from the provider perspective. Disease and population data were sourced from the state surveillance data, human census and livestock census. Program costs were extrapolated from official documents. All capital costs were depreciated to estimate annualized costs. All costs were inflated to 2012 Rupees. Sensitivity analysis was conducted across all major cost centres to assess their relative impact on program costs. It was found that the annual costs of providing Anti-rabies vaccine alone and in combination with Immunoglobulins was $0.7 million (Rs 36 million) and $2.2 million (Rs 119 million), respectively. For animal sector interventions, the annualised costs of rolling out surgical sterilisation-immunization, injectable immunization and oral immunizations were estimated to be $ 44 million (Rs 2,350 million), $23 million (Rs 1,230 million) and $ 11 million (Rs 590 million), respectively. Dog bite incidence, health systems coverage and cost of rabies biologicals were found to be important drivers of costs for human interventions. For the animal sector interventions, the size of dog catching team, dog population and vaccine costs were found to be driving the costs. Rabies control in Tamil Nadu seems a costly proposition the way it is currently structured. Policy makers in Tamil Nadu and other similar settings should consider the long-term financial sustainability before embarking upon a state or nation-wide rabies control programme.

  9. Cost-Effective Control of Infectious Disease Outbreaks Accounting for Societal Reaction

    OpenAIRE

    Fast, Shannon M.; Markuzon, Natasha; Gonzalez, Marta C.

    2015-01-01

    Background Studies of cost-effective disease prevention have typically focused on the tradeoff between the cost of disease transmission and the cost of applying control measures. We present a novel approach that also accounts for the cost of social disruptions resulting from the spread of disease. These disruptions, which we call social response, can include heightened anxiety, strain on healthcare infrastructure, economic losses, or violence. Methodology The spread of disease and social resp...

  10. RodPilotR - The Innovative and Cost-Effective Digital Control Rod Drive Control System for PWRs

    International Nuclear Information System (INIS)

    Baron, Clemens

    2008-01-01

    With RodPilot, AREVA NP offers an innovative and cost-effective system for controlling control rods in Pressurized Water Reactors. RodPilot controls the three operating coils of the control rod drive mechanism (lift, moveable gripper and stationary gripper coil). The rods are inserted into or withdrawn from the core as required by the Reactor Control System. The system combines modern components, state-of-the-art logic and a proven electronic control rod drive control principle to provide enhanced reliability and lower maintenance costs. (author)

  11. RodPilot{sup R} - The Innovative and Cost-Effective Digital Control Rod Drive Control System for PWRs

    Energy Technology Data Exchange (ETDEWEB)

    Baron, Clemens [AREVA NP GmbH, NLEE-G, Postfach 1199, 91001 Erlangen (Germany)

    2008-07-01

    With RodPilot, AREVA NP offers an innovative and cost-effective system for controlling control rods in Pressurized Water Reactors. RodPilot controls the three operating coils of the control rod drive mechanism (lift, moveable gripper and stationary gripper coil). The rods are inserted into or withdrawn from the core as required by the Reactor Control System. The system combines modern components, state-of-the-art logic and a proven electronic control rod drive control principle to provide enhanced reliability and lower maintenance costs. (author)

  12. The Cost-Effectiveness of Low-Cost Essential Antihypertensive Medicines for Hypertension Control in China: A Modelling Study.

    Directory of Open Access Journals (Sweden)

    Dongfeng Gu

    2015-08-01

    Full Text Available Hypertension is China's leading cardiovascular disease risk factor. Improved hypertension control in China would result in result in enormous health gains in the world's largest population. A computer simulation model projected the cost-effectiveness of hypertension treatment in Chinese adults, assuming a range of essential medicines list drug costs.The Cardiovascular Disease Policy Model-China, a Markov-style computer simulation model, simulated hypertension screening, essential medicines program implementation, hypertension control program administration, drug treatment and monitoring costs, disease-related costs, and quality-adjusted life years (QALYs gained by preventing cardiovascular disease or lost because of drug side effects in untreated hypertensive adults aged 35-84 y over 2015-2025. Cost-effectiveness was assessed in cardiovascular disease patients (secondary prevention and for two blood pressure ranges in primary prevention (stage one, 140-159/90-99 mm Hg; stage two, ≥160/≥100 mm Hg. Treatment of isolated systolic hypertension and combined systolic and diastolic hypertension were modeled as a reduction in systolic blood pressure; treatment of isolated diastolic hypertension was modeled as a reduction in diastolic blood pressure. One-way and probabilistic sensitivity analyses explored ranges of antihypertensive drug effectiveness and costs, monitoring frequency, medication adherence, side effect severity, background hypertension prevalence, antihypertensive medication treatment, case fatality, incidence and prevalence, and cardiovascular disease treatment costs. Median antihypertensive costs from Shanghai and Yunnan province were entered into the model in order to estimate the effects of very low and high drug prices. Incremental cost-effectiveness ratios less than the per capita gross domestic product of China (11,900 international dollars [Int$] in 2015 were considered cost-effective. Treating hypertensive adults with prior

  13. Effective tree hazard control on forested recreation sites...losses and protection costs evaluated

    Science.gov (United States)

    Lee A. Paine

    1967-01-01

    Effectiveness of hazard control was evaluated by analyzing data on tree failures, accidents, and control costs on California recreation sites. Results indicate that reduction of limb hazard in oaks and bole hazard in conifers is the most effective form of control. Least effective is limb hazard reduction in conifers. After hazard control goals or control budgets have...

  14. Cost Cumulant-Based Control for a Class of Linear Quadratic Tracking Problems

    National Research Council Canada - National Science Library

    Pham, Khanh D

    2007-01-01

    .... For instance, the present paper extends the application of cost-cumulant controller design to control of a wide class of linear-quadratic tracking systems where output measurements of a tracker...

  15. An easy and low cost option for economic statistical process control ...

    African Journals Online (AJOL)

    An easy and low cost option for economic statistical process control using Excel. ... in both economic and economic statistical designs of the X-control chart. ... in this paper and the numerical examples illustrated are executed on this program.

  16. Control of delay dominant systems with costs related to switching

    DEFF Research Database (Denmark)

    Deng, Honglian; Larsen, Lars Finn Sloth; Stoustrup, Jakob

    2010-01-01

    The objective of this paper is to extend a novel low complexity method for optimizing switch control developed by the authors earlier to work with delay dominant systems and demonstrate that the method works in practice with a refrigeration test system. The extended method solves switching problems...... controller with fixed bounds shows that the optimizing switch control outperforms the baseline....

  17. [Construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province].

    Science.gov (United States)

    Zhao-Hui, Zheng; Jun, Qin; Li, Chen; Hong, Zhu; Li, Tang; Zu-Wu, Tu; Ming-Xing, Zeng; Qian, Sun; Shun-Xiang, Cai

    2016-10-09

    To analyze the construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province, so as to provide the reference for the standardized detection and management of schistosomiasis laboratories. According to the laboratory standard of schistosomiasis at provincial, municipal and county levels, the management system construction and operation status of 60 schistosomiasis control institutions was assessed by the acceptance examination method from 2013 to 2015. The management system was already occupied over all the laboratories of schistosomiasis control institutions and was officially running. There were 588 non-conformities and the inconsistency rate was 19.60%. The non-conformity rate of the management system of laboratory quality control was 38.10% (224 cases) and the non-conformity rate of requirements of instrument and equipment was 23.81% (140 cases). The management system has played an important role in the standardized management of schistosomiasis laboratories.

  18. Procedure guide of design, construction of prototypes, calibration and sure operation of nucleonic control systems

    International Nuclear Information System (INIS)

    Banados Perez, H.; Griffith Martinez, J.; Desdin Garcia, L.F.; Rodriguez Cardona, R.L.; Molina, G.; Sebastian Calvo, C.

    1999-01-01

    This Guide was elaborated in the mark of the project RLA/8/024 ARCAL XLII 'Industrial Applications of the Tracer Technology and Nucleonic Control Systems'. Its objective is to establish the approaches for the design, the construction, the selection and the procedures for the sure operation of the Nucleonic Control Systems (NCS) in the industry. The NCS is used to control processes to high speeds, materials with extreme conditions or with noxious chemical properties, susceptible materials of being damaged by contact and packed products. In this document is defined the scope of the procedure. The SCN are classified according to: type of radiations, the mobility of the components, the degree of the beams collimation; and in function of the security. The design and construction criteria of the nuclear meters and of the systems of control nucleonic are exposed

  19. Controlling for endogeneity in attributable costs of vancomycin-resistant enterococci from a Canadian hospital.

    Science.gov (United States)

    Lloyd-Smith, Patrick

    2017-12-01

    Decisions regarding the optimal provision of infection prevention and control resources depend on accurate estimates of the attributable costs of health care-associated infections. This is challenging given the skewed nature of health care cost data and the endogeneity of health care-associated infections. The objective of this study is to determine the hospital costs attributable to vancomycin-resistant enterococci (VRE) while accounting for endogeneity. This study builds on an attributable cost model conducted by a retrospective cohort study including 1,292 patients admitted to an urban hospital in Vancouver, Canada. Attributable hospital costs were estimated with multivariate generalized linear models (GLMs). To account for endogeneity, a control function approach was used. The analysis sample included 217 patients with health care-associated VRE. In the standard GLM, the costs attributable to VRE are $17,949 (SEM, $2,993). However, accounting for endogeneity, the attributable costs were estimated to range from $14,706 (SEM, $7,612) to $42,101 (SEM, $15,533). Across all model specifications, attributable costs are 76% higher on average when controlling for endogeneity. VRE was independently associated with increased hospital costs, and controlling for endogeneity lead to higher attributable cost estimates. Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  20. Problems and solutions in the field of improving control and supervision activities in the construction sector

    Science.gov (United States)

    Dikareva, Varvara; Mostovaya, Anna

    2018-03-01

    The improvement of control and supervision activities in high-rise construction is an important goal of the state. In the paper, the author considered the initiatives of the state in terms of improving the control activity. He shows the main approaches that will be applied by the state. The application of information and communication technologies in control activities is described in detail. It was noted that the quality of the regulation of various procedures remains a serious issue. At the same time, modern innovations in the field of control should take into account the increasing volumes of data and information about various economic processes.

  1. A worksite prevention program for construction workers: Design of a randomized controlled trial

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Joling, C.I.; Proper, K.I.; Blatter, B.M.; Bongers, P.M.

    2010-01-01

    Background. A worksite prevention program was developed to promote the work ability of construction workers and thereby prolong a healthy working life. The objective of this paper is to present the design of a randomized controlled trial evaluating the effectiveness of that intervention program

  2. An e-Learning System with MR for Experiments Involving Circuit Construction to Control a Robot

    Science.gov (United States)

    Takemura, Atsushi

    2016-01-01

    This paper proposes a novel e-Learning system for technological experiments involving electronic circuit-construction and controlling robot motion that are necessary in the field of technology. The proposed system performs automated recognition of circuit images transmitted from individual learners and automatically supplies the learner with…

  3. The Attitudes & Beliefs on Classroom Control Inventory-Revised and Revisited: A Continuation of Construct Validation

    Science.gov (United States)

    Martin, Nancy K.; Yin, Zenong; Mayall, Hayley

    2008-01-01

    The purpose of this study was to report the psychometric properties of the revised Attitudes and Beliefs of Classroom Control Inventory (ABCC-R). Data were collected from 489 participants via the ABCC-R, Teacher Efficacy Scale, Problems in School Questionnaire, and a demographic questionnaire. Results were in keeping with the construct. The…

  4. PERFORMANCE AND COST OF MERCURY AND MULTIPOLLUTANT EMISSION CONTROL TECHNOLOGY APPLICATIONS ON ELECTRIC UTILITY BOILERS

    Science.gov (United States)

    The report presents estimates of the performance and cost of both powdered activated carbon (PAC) and multipollutant control technologies that may be useful in controlling mercury emissions. Based on currently available data, cost estimates for PAC injection range are 0.03-3.096 ...

  5. Costs and benefits of controlling quarantine diseases : a bio-economic modeling approach

    NARCIS (Netherlands)

    Breukers, M.L.H.; Mourits, M.C.M.; Werf, van der W.; Oude Lansink, A.G.J.M.

    2008-01-01

    This article describes a bio-economic model to quantify the costs and benefits of controlling plant quarantine diseases. The model integrates the epidemiology and economic consequences of a quarantine disease. It allows for ex ante evaluation of control scenarios for their cost-effectiveness, taking

  6. The Evolution of Cost/Schedule Control (Direct Labor) in Naval Shipyards

    National Research Council Canada - National Science Library

    Gessis, Scott N

    1992-01-01

    The evolution of a Cost/Schedule Control System (C/SCS), for direct labor, in naval shipyards can be traced from the cost/schedule control concept used in the Air Force in the 1960s, as an initiative toward more reliable data...

  7. Influence of transaction costs on controlling activity of territorial taxation bodies

    Directory of Open Access Journals (Sweden)

    Natalya A. Bondareva

    2016-01-01

    Full Text Available Objective to disclose and justify transaction costs of controlling activities of the territorial taxation bodies and their impact on tax control under the need for effective functioning and optimal decision making with a view of reducing the state expenditures on tax control. Methods general scientific synthesis deduction induction generalization testing interviewing observation forecasting scientific abstraction statistical analysis logic and methods of grouping and classification expert assessment. Results the analysis and grouping of transaction costs of controlling activities of the territorial taxation bodies have been carried out. It was found that the most time and resource consuming are onsite tax inspections. The factors that have a significant impact on the efficiency of tax control were revealed. It is proved that the release of material and time resources contributes to the transformation of the tax bodies. Scientific novelty the main problem of implementation of the onsite tax control is its costs. The existing studies do not give a systematic list of tax control costs of the territorial tax bodies in general and transaction costs of tax control in particular. The author shows that the reduction of transaction costs as factors of influence on the tax control will free up the working time of the inspectors and will bring economic benefits and also will allow to consolidate territorial tax bodies and change the status of a tax inspector. Practical significance reducing the cost of tax control is becoming increasingly important in terms of saving financial resources of the state.

  8. High Performance Low Cost Digitally Controlled Power Conversion Technology

    DEFF Research Database (Denmark)

    Jakobsen, Lars Tønnes

    2008-01-01

    in order to reduce the power consumption of servers and datacenters. The work presented in this thesis includes digital control methods for switch-mode converters implemented in microcontrollers, digital signal controllers and field programmable gate arrays. Microcontrollers are cheap devices that can...... be used for real-time control of switch-mode converters. Software design in the assembly language of the microcontroller is important because of the limited resources of the microcontroller. Microcontrollers are best suited for power electronics applications with low bandwidth requirements because...... the execution time of the software algorithm that realises the digital control law will constitute a considerable delay in the control loop. Digital signal controllers are powerful devices capable of performing arithmetic functions much faster than a microcontroller can. Digital signal controllers are well...

  9. Development of modular control software for construction 3D-printer

    Science.gov (United States)

    Bazhanov, A.; Yudin, D.; Porkhalo, V.

    2018-03-01

    This article discusses the approach to developing modular software for real-time control of an industrial construction 3D printer. The proposed structure of a two-level software solution is implemented for a robotic system that moves in a Cartesian coordinate system with multi-axis interpolation. An algorithm for the formation and analysis of a path is considered to enable the most effective control of printing through dynamic programming.

  10. User Delay Cost Model and Facilities Maintenance Cost Model for a Terminal Control Area : Volume 2. User's Manual and Program Documentation for the User Delay Cost Model

    Science.gov (United States)

    1978-05-01

    The User Delay Cost Model (UDCM) is a Monte Carlo simulation of certain classes of movement of air traffic in the Boston Terminal Control Area (TCA). It incorporates a weather module, an aircraft generation module, a facilities module, and an air con...

  11. Activity-Based Costing for Agile Manufacturing Control

    Science.gov (United States)

    1998-08-01

    to maintain a complex accounting system to meet your decision-making needs and the requirements of GAAP (Generally Accepted Accounting Principles). An...including hourly and salary employees Fringe benefits Fixed costs such as depreciation , property taxes, leases, and other budgeted expenses Variable...3.5 Model Design Issues An ABC model is a stand alone management tool that does not have to adhere to GAAP regulations, therefore it can open up a wide

  12. Cost-Effective Control of Infectious Disease Outbreaks Accounting for Societal Reaction.

    Science.gov (United States)

    Fast, Shannon M; González, Marta C; Markuzon, Natasha

    2015-01-01

    Studies of cost-effective disease prevention have typically focused on the tradeoff between the cost of disease transmission and the cost of applying control measures. We present a novel approach that also accounts for the cost of social disruptions resulting from the spread of disease. These disruptions, which we call social response, can include heightened anxiety, strain on healthcare infrastructure, economic losses, or violence. The spread of disease and social response are simulated under several different intervention strategies. The modeled social response depends upon the perceived risk of the disease, the extent of disease spread, and the media involvement. Using Monte Carlo simulation, we estimate the total number of infections and total social response for each strategy. We then identify the strategy that minimizes the expected total cost of the disease, which includes the cost of the disease itself, the cost of control measures, and the cost of social response. The model-based simulations suggest that the least-cost disease control strategy depends upon the perceived risk of the disease, as well as media intervention. The most cost-effective solution for diseases with low perceived risk was to implement moderate control measures. For diseases with higher perceived severity, such as SARS or Ebola, the most cost-effective strategy shifted toward intervening earlier in the outbreak, with greater resources. When intervention elicited increased media involvement, it remained important to control high severity diseases quickly. For moderate severity diseases, however, it became most cost-effective to implement no intervention and allow the disease to run its course. Our simulation results imply that, when diseases are perceived as severe, the costs of social response have a significant influence on selecting the most cost-effective strategy.

  13. Cost-Effective Control of Infectious Disease Outbreaks Accounting for Societal Reaction.

    Directory of Open Access Journals (Sweden)

    Shannon M Fast

    Full Text Available Studies of cost-effective disease prevention have typically focused on the tradeoff between the cost of disease transmission and the cost of applying control measures. We present a novel approach that also accounts for the cost of social disruptions resulting from the spread of disease. These disruptions, which we call social response, can include heightened anxiety, strain on healthcare infrastructure, economic losses, or violence.The spread of disease and social response are simulated under several different intervention strategies. The modeled social response depends upon the perceived risk of the disease, the extent of disease spread, and the media involvement. Using Monte Carlo simulation, we estimate the total number of infections and total social response for each strategy. We then identify the strategy that minimizes the expected total cost of the disease, which includes the cost of the disease itself, the cost of control measures, and the cost of social response.The model-based simulations suggest that the least-cost disease control strategy depends upon the perceived risk of the disease, as well as media intervention. The most cost-effective solution for diseases with low perceived risk was to implement moderate control measures. For diseases with higher perceived severity, such as SARS or Ebola, the most cost-effective strategy shifted toward intervening earlier in the outbreak, with greater resources. When intervention elicited increased media involvement, it remained important to control high severity diseases quickly. For moderate severity diseases, however, it became most cost-effective to implement no intervention and allow the disease to run its course. Our simulation results imply that, when diseases are perceived as severe, the costs of social response have a significant influence on selecting the most cost-effective strategy.

  14. Analysis of Correlations between the Level of Partnering Relations and their Influence on the Time, Cost, Quality and Safety of Implementation of Construction Projects

    Directory of Open Access Journals (Sweden)

    Radziszewska-Zielina Elżbieta

    2014-11-01

    Full Text Available The present paper uses the developed model of the influence of partnering relations on the time, cost, quality and safety of implementation of construction projects. On its basis, a questionnaire has been created and a preliminary survey has been conducted. The paper presents an analysis of correlations between the level of partnering relations in the context of the partnering measures indicated in the model and their influence on the time, cost, quality and safety of implementation of construction projects. The analysis was conducted based on the data collected in 52 construction projects. The values of the Spearman rank correlation coefficient and the Pearson product-moment correlation coefficient have been calculated for the examined relations. The analysis allowed for indicating the measures of partnering whose improvement most often brings benefits with regard to the time, cost, quality and safety of implementation of construction projects. Among the 80 analysed correlations, the ones identified as strong were: 15 relations connected with the time, 8 with the cost, 5 with the quality and 1 with the safety of implementation of construction projects.

  15. International comparison of the economy of constructing nuclear power plants by using the method of referred investment costs in Czechoslovakia and in the USA

    International Nuclear Information System (INIS)

    Majer, P.; Jelen, J.

    1989-01-01

    The method of referred investment costs was applied to a comparison of the economy of constructing the nuclear power plant at Temelin, Czechoslovakia, with that for the hypothetic nuclear power plant at Middletown, USA. For a reasonably adopted Czechoslovak crown/USD rate, the obtained costs for building the Temelin power plant are 50% higher than those for building the reference Middletown power plant. This compares rather favorably with the general level of investment costs in Czechoslovakia under the present economic conditions. The analysis performed shows that savings in investment costs should be sought in the fields of technological modernization of preparatory work and in all construction work, with the aim to reduce particularly live work. (P.A.). 12 tabs., 8 refs

  16. Harm reduction in U.S. tobacco control: Constructions in textual news media.

    Science.gov (United States)

    Eversman, Michael H

    2015-06-01

    U.S. tobacco control has long emphasized abstinence, yet quitting smoking is hard and cessation rates low. Tobacco harm reduction alternatives espouse substituting cigarettes with safer nicotine and tobacco products. Policy shifts embracing tobacco harm reduction have increased media attention, yet it remains controversial. Discourse theory posits language as fluid, and socially constructed meaning as neither absolute nor neutral, elevating certain views over others while depicting "discursive struggle" between them. While an abstinence-based framework dominates tobacco policy, discourse theory suggests constructions of nicotine and tobacco use can change, for example by positioning tobacco harm reduction more favorably. Textual discourse analysis was used to explore constructions of tobacco harm reduction in 478 (308 original) U.S. textual news media articles spanning 1996-2014. Using keyword database sampling, retrieved articles were analyzed first as discrete recording units and then to identify emergent thematic content. Constructions of tobacco harm reduction shifted over this time, revealing tension among industry and policy interests through competing definitions of tobacco harm reduction, depictions of its underlying science, and accounts of regulatory matters including tobacco industry support for harm reduction and desired marketing and taxation legislation. Heightened salience surrounding tobacco harm reduction and electronic cigarettes suggests their greater acceptance in U.S. tobacco control. Various media depictions construct harm reduction as a temporary means to cessation, and conflict with other constructions of it that place no subjective value on continued "safer" tobacco/nicotine use. Constructions of science largely obscure claims of the veracity of tobacco harm reduction, with conflict surrounding appropriate public health benchmarks for tobacco policy and health risks of nicotine use. Taxation policies and e-cigarette pricing relative to

  17. Reduced-cost second-order algebraic-diagrammatic construction method for excitation energies and transition moments

    Science.gov (United States)

    Mester, Dávid; Nagy, Péter R.; Kállay, Mihály

    2018-03-01

    A reduced-cost implementation of the second-order algebraic-diagrammatic construction [ADC(2)] method is presented. We introduce approximations by restricting virtual natural orbitals and natural auxiliary functions, which results, on average, in more than an order of magnitude speedup compared to conventional, density-fitting ADC(2) algorithms. The present scheme is the successor of our previous approach [D. Mester, P. R. Nagy, and M. Kállay, J. Chem. Phys. 146, 194102 (2017)], which has been successfully applied to obtain singlet excitation energies with the linear-response second-order coupled-cluster singles and doubles model. Here we report further methodological improvements and the extension of the method to compute singlet and triplet ADC(2) excitation energies and transition moments. The various approximations are carefully benchmarked, and conservative truncation thresholds are selected which guarantee errors much smaller than the intrinsic error of the ADC(2) method. Using the canonical values as reference, we find that the mean absolute error for both singlet and triplet ADC(2) excitation energies is 0.02 eV, while that for oscillator strengths is 0.001 a.u. The rigorous cutoff parameters together with the significantly reduced operation count and storage requirements allow us to obtain accurate ADC(2) excitation energies and transition properties using triple-ζ basis sets for systems of up to one hundred atoms.

  18. Cost-Effectiveness of Aflatoxin Control Methods: Economic Incentives

    Science.gov (United States)

    Multiple sectors in U.S. crop industries – growers, elevators, handlers/shellers, processors, distributors, and consumers – are affected by aflatoxin contamination of commodities, and have the potential to control it. Aflatoxin control methods at both preharvest and postharvest levels have been dev...

  19. Sensorless control of low-cost single-phase hybrid switched reluctance motor drive

    DEFF Research Database (Denmark)

    Jakobsen, Uffe; Lu, Kaiyuan; Rasmussen, Peter Omand

    2013-01-01

    This paper presents a sensorless-controlled, low-cost, low-power, variable-speed drive system suitable for fan and pump applications. The main advantages of this drive system are the low system cost, simple converter structure, and simple but robust sensorless control technique. The drive motor...... is a special Hybrid Switched Reluctance Motor (HSRM). The proposed sensorless control method utilizes beneficially the stator side permanent magnet field and its performance is motor parameter independent. The unique low-cost drive system solution, simple and robust sensorless control features of this drive...

  20. Sensorless Control of Low-cost Single-phase Hybrid Switched Reluctance Motor Drive

    DEFF Research Database (Denmark)

    Jakobsen, Uffe; Lu, Kaiyuan; Rasmussen, Peter Omand

    2015-01-01

    This paper presents a sensorless-controlled, low-cost, low-power, and variable-speed drive system suitable for fan and pump applications. The main advantages of this drive system are the low system cost, simple converter structure, and simple but robust sensorless control technique. The drive motor...... is a special hybrid switched reluctance motor. The proposed sensorless control method beneficially utilizes the stator side PM field and its performance is motor parameter independent. The unique low-cost drive system solution, simple and robust sensorless control features of this drive system, is demonstrated...

  1. The construction design of ball bearings used in the control rod driving mechanisms of PWRs

    International Nuclear Information System (INIS)

    Leng Chengmu; Huang Chongming; Chen Jianting.

    1986-01-01

    According to the operation conditions of ball bearings used in the control rod driving mechanisms of PWRs, this paper has analysed and discussed the problems that must be taken into account in the construction design of this ball bearing. It includes: a discussion about the reasonable selection of construction parameters of the bearing, deduction of the relationship between bearing clearance and contact angle, and the emphasis on the significance of assembling accuracy and torque measurement in the assurance of operational performance of the bearings. These experiences may be somewhat valuable for the design and application of this kind of ball bearing

  2. The detector of BES III muon constructs with the quality control database

    International Nuclear Information System (INIS)

    Yao Ning; Chinese Academy of Sciences, Beijing; Zheng Guoheng; Yang Lei; Zhang Jiawen; Han Jifeng; Xie Yuguang; Zhao Jianbing; Chen Jin

    2006-01-01

    Because of these softwares' characters, the authors use MySQL, PHP, Apache to construct our quality control database. The authors show the structure of BES MUON Detector and explain the reason why we must construct database. The authors show the results that our database can present. People can access the system through its web site, which retrieves data on request from the database and can display results in dynamically created images. The database is the transparent technique support platform of the maintenance of the detector. (authors)

  3. A case-control study of airways obstruction among construction workers.

    Science.gov (United States)

    Dement, John; Welch, Laura; Ringen, Knut; Quinn, Patricia; Chen, Anna; Haas, Scott

    2015-10-01

    While smoking is the major cause of chronic obstructive pulmonary disease (COPD), occupational exposures to vapors, gases, dusts, and fumes (VGDF) increase COPD risk. This case-control study estimated the risk of COPD attributable to occupational exposures among construction workers. The study population included 834 cases and 1243 controls participating in a national medical screening program for older construction workers between 1997 and 2013. Qualitative exposure indices were developed based on lifetime work and exposure histories. Approximately 18% (95% CI = 2-24%) of COPD risk can be attributed to construction-related exposures, which are additive to the risk contributed by smoking. A measure of all VGDF exposures combined was a strong predictor of COPD risk. Construction workers are at increased risk of COPD as a result of broad and complex effects of many exposures acting independently or interactively. Control methods should be implemented to prevent worker exposures, and smoking cessation should be promoted. © 2015 The Authors. American Journal of Industrial Medicine Published by Wiley Periodicals, Inc.

  4. Low cost nuclear spectrometer based on micro-controller device

    International Nuclear Information System (INIS)

    Carrillo, M.A.; Aramayo, P.B.

    2009-01-01

    The present work describes the development of a gamma radiation Multichannel Analyzer device. That is to say, the development of a device able to display in the screen of a conventional computer a histogram of radioactive accounts (or accounts rate) received, in function of the different emission energies. It is a low cost implementation, oriented to mainly educational activities, but also applicable, within its limitations, to medium precision investigation works. In this first phase all the necessary one was implemented to detect the radioactive emissions, to measure them in energy, to store a complete spectrum and electronically to transfer it to a PC for its subsequent analysis. (author)

  5. Cost-benefit considerations in the development of policies and procedures for controlling indoor exposure to radon and its decay products

    International Nuclear Information System (INIS)

    Puskin, J.S.; Guimond, R.J.; Napolitano, S.; Nelson, C.B.

    1989-01-01

    The applicability of ALARA to the problem of controlling residential radon levels is limited. Cost-benefit considerations can nevertheless be useful in guiding policy in this area. From a societal perspective, the cost-benefit balance for mitigating radon in homes to the EPA action level of 4 pCi/L, or lower, is generally better than for most programs aimed at reducing environmental risks. Reduction of radon levels in new homes tends to be less costly; moreover, reduced radon levels in new construction may be achievable with a net cost savings to the homeowner due to concomitant decreases in energy expenses. Since programs to reduced radon exposure rely on voluntary actions by homeowners, the societal cost-benefit balance cannot dictate the extent of radon mitigation efforts. However, both economic incentives and governmental guidance can influence these efforts. Cost-benefit analysis can be an important tool in formulating such guidance

  6. Army Corps of Engineers: Cost Increases in Flood Control Projects and Improving Communication with Nonfederal Sponsors

    Science.gov (United States)

    2013-12-01

    such poor condition that it had to have major rehabilitation work performed. Work to fix the deteriorated tunnel cost $10 million more than had...originally been estimated.19 Corps officials on the Little Calumet project said during construction they encountered a former landfill along one portion

  7. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  8. Cost account in agriculture with particular accordance to requirements of decision making process and controls

    Directory of Open Access Journals (Sweden)

    Tomasz Kondraszuk

    2009-01-01

    Full Text Available The article presents cost account applicability in the agricultural companies regarding the general theory of economic and organisation of enterprises. The main focus was laid down to analyse the unit total cost account with variable costs and their applicability in three spheres: stock valuation and profit, requirements of planning and decision making processes and controlling. It was concluded that cost calculation at the level of agricultural enterprise should be an inherent element of integrated information system at the level of registry, planning, decision making and control.

  9. Influence of heat cost allocation on occupants' control of indoor environment in 56 apartments

    DEFF Research Database (Denmark)

    Andersen, Søren; Andersen, Rune Korsholm; Olesen, Bjarne W.

    2016-01-01

    -structured interviews showed a strong influence of the heat cost allocation plan on the occupants' control strategies. Occupants whose heating bills were based on floor area focused on a healthy and comfortable indoor environment. Occupants whose heating bills were based on meter readings focused on energy conservation...... of this paper was to study the indoor environment in buildings with collective and individual heat cost allocation plans, to investigate how the heat cost allocation influenced occupant behaviour and how occupants controlled the indoor environment. The effects of the heat cost allocation type were studied...

  10. Transaction Costs (TCs) in Building Regulations and Control for Green Buildings : Case Study of Hong Kong

    NARCIS (Netherlands)

    Fan, Ke; Qian, K.; Chan, EHW; Kähkönen, Kalle; Keinänen, Marko

    2016-01-01

    About 40% of global energy consumption and nearly one-third of global CO2 emissions are on account of buildings. In Hong Kong, buildings consume up to 90% of electricity during construction and operation, where all the design and construction of private developments is subject to control under the

  11. Concepts for Life Cycle Cost Control Required to Achieve Space Transportation Affordability and Sustainability

    Science.gov (United States)

    Rhodes, Russel E.; Zapata, Edgar; Levack, Daniel J. H.; Robinson, John W.; Donahue, Benjamin B.

    2009-01-01

    Cost control must be implemented through the establishment of requirements and controlled continually by managing to these requirements. Cost control of the non-recurring side of life cycle cost has traditionally been implemented in both commercial and government programs. The government uses the budget process to implement this control. The commercial approach is to use a similar process of allocating the non-recurring cost to major elements of the program. This type of control generally manages through a work breakdown structure (WBS) by defining the major elements of the program. If the cost control is to be applied across the entire program life cycle cost (LCC), the approach must be addressed very differently. A functional breakdown structure (FBS) is defined and recommended. Use of a FBS provides the visibifity to allow the choice of an integrated solution reducing the cost of providing many different elements of like function. The different functional solutions that drive the hardware logistics, quantity of documentation, operational labor, reliability and maintainability balance, and total integration of the entire system from DDT&E through the life of the program must be fully defined, compared, and final decisions made among these competing solutions. The major drivers of recurring cost have been identified and are presented and discussed. The LCC requirements must be established and flowed down to provide control of LCC. This LCC control will require a structured rigid process similar to the one traditionally used to control weight/performance for space transportation systems throughout the entire program. It has been demonstrated over the last 30 years that without a firm requirement and methodically structured cost control, it is unlikely that affordable and sustainable space transportation system LCC will be achieved.

  12. Innovative dengue vector control interventions in Latin America: what do they cost?

    Science.gov (United States)

    Basso, César; Beltrán-Ayala, Efraín; Mitchell-Foster, Kendra; Cortés, Sebastián; Manrique-Saide, Pablo; Guillermo-May, Guillermo; Carvalho de Lima, Edilmar

    2016-01-01

    Background Five studies were conducted in Fortaleza (Brazil), Girardot (Colombia), Machala (Ecuador), Acapulco (Mexico), and Salto (Uruguay) to assess dengue vector control interventions tailored to the context. The studies involved the community explicitly in the implementation, and focused on the most productive breeding places for Aedes aegypti. This article reports the cost analysis of these interventions. Methods We conducted the costing from the perspective of the vector control program. We collected data on quantities and unit costs of the resources used to deliver the interventions. Comparable information was requested for the routine activities. Cost items were classified, analyzed descriptively, and aggregated to calculate total costs, costs per house reached, and incremental costs. Results Cost per house of the interventions were $18.89 (Fortaleza), $21.86 (Girardot), $30.61 (Machala), $39.47 (Acapulco), and $6.98 (Salto). Intervention components that focused mainly on changes to the established vector control programs seem affordable; cost savings were identified in Salto (−21%) and the clean patio component in Machala (−12%). An incremental cost of 10% was estimated in Fortaleza. On the other hand, there were also completely new components that would require sizeable financial efforts (installing insecticide-treated nets in Girardot and Acapulco costs $16.97 and $24.96 per house, respectively). Conclusions The interventions are promising, seem affordable and may improve the cost profile of the established vector control programs. The costs of the new components could be considerable, and should be assessed in relation to the benefits in reduced dengue burden. PMID:26924235

  13. Marginal abatement cost curve for nitrogen oxides incorporating controls, renewable electricity, energy efficiency, and fuel switching.

    Science.gov (United States)

    Loughlin, Daniel H; Macpherson, Alexander J; Kaufman, Katherine R; Keaveny, Brian N

    2017-10-01

    A marginal abatement cost curve (MACC) traces out the relationship between the quantity of pollution abated and the marginal cost of abating each additional unit. In the context of air quality management, MACCs are typically developed by sorting control technologies by their relative cost-effectiveness. Other potentially important abatement measures such as renewable electricity, energy efficiency, and fuel switching (RE/EE/FS) are often not incorporated into MACCs, as it is difficult to quantify their costs and abatement potential. In this paper, a U.S. energy system model is used to develop a MACC for nitrogen oxides (NO x ) that incorporates both traditional controls and these additional measures. The MACC is decomposed by sector, and the relative cost-effectiveness of RE/EE/FS and traditional controls are compared. RE/EE/FS are shown to have the potential to increase emission reductions beyond what is possible when applying traditional controls alone. Furthermore, a portion of RE/EE/FS appear to be cost-competitive with traditional controls. Renewable electricity, energy efficiency, and fuel switching can be cost-competitive with traditional air pollutant controls for abating air pollutant emissions. The application of renewable electricity, energy efficiency, and fuel switching is also shown to have the potential to increase emission reductions beyond what is possible when applying traditional controls alone.

  14. Adaptive Robust Online Constructive Fuzzy Control of a Complex Surface Vehicle System.

    Science.gov (United States)

    Wang, Ning; Er, Meng Joo; Sun, Jing-Chao; Liu, Yan-Cheng

    2016-07-01

    In this paper, a novel adaptive robust online constructive fuzzy control (AR-OCFC) scheme, employing an online constructive fuzzy approximator (OCFA), to deal with tracking surface vehicles with uncertainties and unknown disturbances is proposed. Significant contributions of this paper are as follows: 1) unlike previous self-organizing fuzzy neural networks, the OCFA employs decoupled distance measure to dynamically allocate discriminable and sparse fuzzy sets in each dimension and is able to parsimoniously self-construct high interpretable T-S fuzzy rules; 2) an OCFA-based dominant adaptive controller (DAC) is designed by employing the improved projection-based adaptive laws derived from the Lyapunov synthesis which can guarantee reasonable fuzzy partitions; 3) closed-loop system stability and robustness are ensured by stable cancelation and decoupled adaptive compensation, respectively, thereby contributing to an auxiliary robust controller (ARC); and 4) global asymptotic closed-loop system can be guaranteed by AR-OCFC consisting of DAC and ARC and all signals are bounded. Simulation studies and comprehensive comparisons with state-of-the-arts fixed- and dynamic-structure adaptive control schemes demonstrate superior performance of the AR-OCFC in terms of tracking and approximation accuracy.

  15. Cost-effective instrumentation and control upgrades for commercial nuclear power plants surety principles developed at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Rochau, G.E.; Dalton, L.J.

    1998-01-01

    Many nuclear power plants use instrument and control systems based on analog electronics. The state of the art in process control and instrumentation has advanced to use digital electronics and incorporate advanced technology. This technology includes: distributed microprocessors, fiber optics, intelligent systems (neutral networks), and advanced displays. The technology is used to optimize processes and enhance the man-machine interface while maintaining control and safety of the processes. Nuclear power plant operators have been hesitant to install this technology because of the cost and uncertainty in the regulatory process. This technology can be directly applied in an operating nuclear power plant provided a surety principle-based 'administrator' hardware system is included in parallel with the upgrade. Sandia National Laboratories has developed a rigorous approach to High Consequence System Surety (HCSS). This approach addresses the key issues of safety, security, and control while satisfying requirements for reliability and quality. We believe that HCSS principles can be applied to nuclear power plants in a manner that allows the off-the-shelf use of process control instrumentation while maintaining a high level of safety and enhancing the plant performance. We propose that an HCSS Administrator be constructed as a standardized approach to address regulatory issues. Such an administrator would allow a plant control system to be constructed with commercially available, state-to-the-art equipment and be customized to the needs of the individual plant operator. (author)

  16. Cost-effective instrumentation and control upgrades for commercial nuclear power plants using surety principles developed at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Rochau, G.E.; Dalton, L.J.

    1997-01-01

    Many nuclear power plants use instrument and control systems based on analog electronics. The state of the art in process control and instrumentation has advanced to use digital electronics and incorporate advanced technology. This technology includes distributed microprocessors, fiber optics, intelligent systems (neural networks), and advanced displays. The technology is used to optimize processes and enhance the man-machine interface while maintaining control and safety of the processes. Nuclear power plant operators have been hesitant to install this technology because of the cost and uncertainty in the regulatory process. This technology can be directly applied in an operating nuclear power plant provided a surety principle-based open-quotes administratorclose quotes hardware system is included in parallel with the upgrade Sandia National Laboratories has developed a rigorous approach to High Consequence System Surety (HCSS). This approach addresses the key issues of safety, security, and control while satisfying requirements for reliability and quality. HCSS principles can be applied to nuclear power plants in a manner that allows the off-the-shelf use of process control instrumentation while maintaining a high level of safety and enhancing the plant performance. We propose that an HCSS administrator be constructed as a standardized approach to address regulatory issues. Such an administrator would allow a plant control system to be constructed with commercially available, state-of-the-art equipment and be customized to the needs of the individual plant operator

  17. Internal versus External Control of Reinforcement: A Review of the Locus of Control Construct

    Science.gov (United States)

    Kormanik, Martin B.; Rocco, Tonette S.

    2009-01-01

    One aspect of personality, perceptions of internal versus external control of reinforcement, shifts under conditions of change. This review of the literature examines the relationship between planned organizational change and locus of control. The review includes literature from the disciplines of clinical and social psychology, adult development,…

  18. Risk factors for non-fatal occupational injuries among construction workers: A case-control study.

    Science.gov (United States)

    Khashaba, E; El-Helaly, M; El-Gilany, A H; Motawei, S M; Foda, S

    2018-02-01

    Substance abuse is a serious problem, because it affects both workers and young people. Prevalence and consequences of cannabis abuse among construction workers in particular are not well studied in Egypt. To determine the association between non-fatal occupational injuries among construction workers and their demographic and occupational factors and to assess the frequency of cannabis abuse and its relationship to injury severity and workdays lost. A case-control study was conducted at Mansoura Emergency Hospital. Cases were 100 acutely injured male workers. A control group of 90 healthy age-matched workers was selected from 8 construction sites. Workers were interviewed, and a questionnaire was completed that included socio-demographic data, full occupational history, and causes and type of injury. Injury outcome measures included lost workdays and the injury severity score (ISS). Cannabis abuse in injured workers was monitored by preliminary testing of urine and confirmatory testing of blood. Logistic regression analysis revealed that the independent predictors of occupational injuries were rural residence, being a carpenter or painter and past history of injuries. The most common accidents were slipping falls (62%). Confirmed cannabis test was positive in 51.1% of the injured workers. Median days away from work were greater among cannabis users than non-users. The ISS was significantly higher among users compared to non-users ( p construction workers with inadequate safety measures.

  19. Tritium system test assembly control system cost estimate

    International Nuclear Information System (INIS)

    Stutz, R.A.

    1979-01-01

    The principal objectives of the Tritium Systems Test Assembly (TSTA), which includes the development, demonstration and interfacing of technologies related to the deuterium--tritium fuel cycle for fusion reactor systems, are concisely stated. The various integrated subsystems comprising TSTA and their functions are discussed. Each of the four major subdivisions of TSTA, including the main process system, the environmental and safety systems, supporting systems and the physical plant are briefly discussed. An overview of the Master Data Acquisition and Control System, which will control all functional operation of TSTA, is provided

  20. A low cost modular control and instrumentation system for accelerators

    International Nuclear Information System (INIS)

    Shubaly, M.R.; Plato, J.G.; Davis, R.W.

    1984-01-01

    A modular control and instrumentation system, being developed for the RFQ1 accelerator and for ion beam test facilities, is based on an intelligent crate and interchangeable plug-in modules for specific applications. The 8085-based microcomputer used in the system can access up to 256 K of memory, has up to 64 levels of vectored interrupts and time of day, and supports terminals, printers, floppy discs and digital cassette drives. This computer is linked to a bus in the front of the crate which carries not only the usual address, data, and control signals, but also interrupt lines and interrupt chip control lines. This bus is designed for easy interfacing. Plug-in modules connect to the bus, and to monitored equipment via a separate connector leading to a terminal strip on the rear of the crate. These modules monitor absolute and differential temperature, flow-rate, voltages and currents and switch settings. A permanently installed module provides ac power switching, an RS232 serial link and full duplex fibre optic serial links for connection to a central computer. Software for the crate provides for task scheduling, data storage and limit tests, communication to higher levels of the control system and field configuration of the crate. (orig.)