WorldWideScience

Sample records for construct higashidori nuclear

  1. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  2. Outline of design and construction work related to the installation of freshwater storage tank at Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Ozaki, Mitsuhiro; Yamaguchi, Kazuhide; Suzuki, Takeshi

    2017-01-01

    Tohoku Electric Power Co., Ltd., at its Higashidori Nuclear Power Station, is promoting the installation of safety measure facilities as an effort to restart the operation. It is implementing a freshwater storage tank installation work to secure core cooling function at the time of severe accident occurrence. Construction started in June 2014, drilling and construction of the framework have advanced while paying due attention to quality assurance, and affiliated facilities are currently under construction. This paper reports the outline of planning, design, and construction work of this project. (A.O.)

  3. Management of main generator condition during long term plant shut down at Higashidori Nuclear Power Station Unit 1

    International Nuclear Information System (INIS)

    Kato, Seiji

    2014-01-01

    Higashidori Nuclear Power Station Unit 1 shut down on February 6, 2011 to start 4th refuel outage. On March 11, 2011, we keep going refuel outage on this moment a large earthquake occurred and tsunami was generated following it which called 'Great East Japan Earthquake'. Refuel outage takes 3 ∼ 5 months normally but Higashidori NPS still keeping shut down over 3 years due to some issues. In this paper, we introduce about management of Main generator condition during long term plant shut down situation in addition to normal plant shut down situation to keep well. (author)

  4. Verification of new technologies introduced into the privately-owned port of Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Murano, Sei-ichiro; Ozaki, Tsutomu; Date, Masanao

    2005-01-01

    The privately-owned port of Higashidori Nuclear Power Station introduced the rubble-slopping breakwater as the seawall and the concrete-caisson breakwater (new caisson breakwater) as the outlet seawall. The distribution of wave pressure on the new caisson breakwater was measured by the wave pressure meteor set on it and compared with the results of the hydraulic model tests. The precast concrete armour unit used Acropod. The conditions of new caisson breakwater, measurement of wave pressure, and the optimum conditions of seawall are stated. The new caisson breakwater showed the high dispersive effect of the impact wave force on the surf zone. The construction cost was decreased by reduction of sectional area and the wave dissipating concrete block. There are no problems about the stability of breakwater confirmed by the hydraulic model test. (S.Y.)

  5. Evaluation of bedrock mainly composed of volcanic aggregate rocks at the Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Hashimoto, Shuichi; Miwa, Tadashi; Nishidachi, Masayuki

    2000-01-01

    When carrying out engineering evaluation on foundation bedrock for important constructions such as nuclear power station, dam, and so forth, it is required as a premise on carrying out various surveys, tests, and analyses to select adequate geological elements, to classify them to some groups capable of regarding as a common engineering property, and to rate them. On a hard bedrock, there is a classification method with relatively higher versatility adding condition of crack and weathering to performances at each site as an index, but on a soft one, most of its classification are carried out individually for its site in response to an index caused by the bedrock itself. Here were shown the results carried out some bedrock classifications on a base of grouping for rock sorts and rock phases, according to some concepts on a draft of the standard on the soft bedrock classification due to the nuclear engineering committee of the Japan Society of Civil Engineers, a reference draft on the soft bedrock classification of the 'Technical indications on seismic resistance design of the nuclear power station' of the Japan Electric Association, (JEAG4601-1987), and so forth. As a result applied the reference draft on the soft bedrock, and so forth to the bedrock at the Higashidori Nuclear Power Station composed of volcanic aggregate rocks of the Miocene epoch of the new Tertiary system, an adequate engineering evaluation was made possible by making grouping of rock sorts and rock phases to a foundation. And, on property evaluation of the quality changed vein, as a result of various tests, appropriate properties could be obtained. (G.K.)

  6. Nuclear power plants: 2005 atw compact statistics

    International Nuclear Information System (INIS)

    Anon.

    2006-01-01

    Nuclear power plants were available for power supply and under construction, respectively, in 32 countries of the world as per end of 2005. A total of 444 nuclear power plants, i.e. three plants more than at the end of 2004, with an aggregate gross power of approx. 389 GWe and an aggregate net power of 370 GWe, respectively, were in operation in 31 countries. The available capacity of nuclear power plants increased by some 4,5 GWe as a result of the capacities added by the four newly commissioned units of Higashidori 1 (Japan), Shika 2 (Japan), Tarapur 4 (India), and Tianwan 1 (China). In addition, unit A-1 of the Pickering nuclear power station in Canada, with 825 MWe, was restarted after a downtime of several years. Two plants were decommissioned for good in 2005: Obrigheim in Germany, and Barsebaeck 2 in Sweden. 23 nuclear generating units, i.e. one unit more than in late 2004, with an aggregate gross power of approx. 19 GWe were still under construction in nine countries by late 2005. In Pakistan, construction of a new project, Chasnupp 2, was started; in China, construction was begun of two units, Lingao Phase 2, units 3 and 4, and in Japan, the Shimane 3 generating unit is being built. (orig.)

  7. Nuclear power-related facilities and neighboring land price: a case study on the Mutsu-Ogawara region, Japan.

    Science.gov (United States)

    Yamane, Fumihiro; Ohgaki, Hideaki; Asano, Kota

    2011-12-01

    From the perspective of risk, nuclear-power-related facilities (NPRFs) are often regarded as locally undesirable land use. However, construction of NPRFs contributes to social infrastructural improvement and job creation in the host communities. This raises a question: How large are these positive and negative effects? To approach this question from an economic viewpoint, we estimated the hedonic land price function for the Mutsu-Ogawara region of Japan from 1976 to 2004 and analyzed year-by-year fluctuations in land prices around the NPRFs located there. Land prices increased gradually in the neighborhood of the nuclear fuel cycle facilities (NFCFs) in Rokkasho Village, except for some falling (i) from 1982 to 1983 (the first official announcement of the project of construction came in 1983), (ii) from 1987 to 1988 (in 1988, the construction began and opposition movements against the project reached their peak), and (iii) from 1998 to 1999 (the pilot carry-in of spent fuels into the reprocessing plant began in 1998). Land prices around the Higashidori Nuclear Power Plant decreased during the period 1981-1982, when the Tohoku Electric Power Corp. and Tokyo Electric Power Corp. announced their joint construction plan. On the other hand, we obtained some results, even though not significant, indicating that land prices around Ohminato and Sekinehama harbors changed with the arrival and departure of the nuclear ship Mutsu, which suffered a radiation leak in 1974. © 2011 Society for Risk Analysis.

  8. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  9. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  10. Innovations in nuclear concrete constructions

    International Nuclear Information System (INIS)

    Tatum, C.B.

    1983-01-01

    The technical requirements and scope of concrete work on nuclear projects present significant engineering and construction challenges. These demands represent the extremes in many areas of construction operations. In meeting these challenges, engineering and construction forces have developed several innovations which can be beneficially applied to other types of construction. Innovative approaches in the general categories of engineering scope, construction input to engineering, work planning, special methods and techniques, and satisfaction of quality assurance requirements are given in this paper. The transfer of this technology to other segments of the construction industry will improve overall performance by avoiding the problem areas encountered on nuclear projects

  11. Summary of nuclear power plant construction

    International Nuclear Information System (INIS)

    Tamura, Saburo

    1973-01-01

    Various conditions for the construction of nuclear power plants in Japan without natural resources were investigated. Expansion of the sites of plants, change of reactor vessels, standardization of nuclear power plants, possiblity of the reduction of construction period, approaching of nuclear power plants to consuming cities, and group construction were studied. Evaluation points were safety and economy. Previous sites of nuclear power plants were mostly on plane ground or cut and enlarge sites. Proposals for underground or offshore plants have been made. The underground plants were made at several places in Europe, and the ocean plant is now approved in U.S.A. as a plant on a man-made island. Vessels for containing nuclear reactors are the last barriers to the leakage of radioactive substance. At the initial period, the vessels were made of steel, which were surrounded by shielding material. Those were dry well type containers. Then, vessel type changed to pressure-suppression type wet containers. Now, it tends to concrete (PC or RC) type containers. There is the policy on the standardization of nuclear power plants by U.S.A.E.C. in recent remarkable activity. The merit and effect of the standardization were studied, and are presented in this paper. Cost of the construction of nuclear power plants is expensive, and interest of money is large. Then, the reduction of construction period is an important problem. The situations of plants approaching to consuming cities in various countries were studied. Idea of group construction is described. (Kato, T.)

  12. Strengthening of nuclear power plant construction safety management

    International Nuclear Information System (INIS)

    Yu Jun

    2012-01-01

    The article describes the warning of the Fukushima nuclear accident, and analyzes the major nuclear safety issues in nuclear power development in China, problems in nuclear power plants under construction, and how to strengthen supervision and management in nuclear power construction. It also points out that the development of nuclear power must attach great importance to the safety, and nuclear power plant construction should strictly implement the principle of 'safety first and quality first'. (author)

  13. Nuclear waste repository design and construction

    International Nuclear Information System (INIS)

    Bohlke, B.M.; Monsees, J.E.

    1987-01-01

    Extensive underground excavation will be required for construction of a mined geologic repository for nuclear waste. Hundreds of thousands of feet of drift will be required based on the conceptual layout design for each candidate nuclear waste repository. Comparison of boring and blasting excavation methods are discussed, as are special design and construction requirements (e.g., quality assurance procedures and performance assessment) for the nuclear waste repository. Comparisons are made between boring and blasting construction methods for the repository designs proposed for salt, volcanic tuff, and basalt

  14. Advanced construction methods for new nuclear power plants

    International Nuclear Information System (INIS)

    Bilbao y Leon, Sama; Cleveland, John; Moon, Seong-Gyun; Tyobeka, Bismark

    2009-01-01

    The length of the construction and commissioning phases of nuclear power plants have historically been longer than for conventional fossil fuelled plants, often having a record of delays and cost overruns as a result from several factors including legal interventions and revisions of safety regulations. Recent nuclear construction projects however, have shown that long construction periods for nuclear power plants are no longer the norm. While there are several inter-related factors that influence the construction time, the use of advanced construction techniques has contributed significantly to reducing the construction length of recent nuclear projects. (author)

  15. Engineering development in nuclear power plant construction

    International Nuclear Information System (INIS)

    Guenther, P.

    1979-01-01

    Proceeding from the up-to-now experience in the erection of nuclear power stations, especially of the first and second unit of the Greifswald nuclear power plant, the following essential aspects of the development of constructional engineering are discussed: (1) constructional features and criteria, (2) organizational management, (3) current status and problems in prelimary operations, and (4) possibilities of further expenditure reductions in constructing nuclear power stations

  16. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  17. Construct ability Improvement for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dae Soo; Lee, Jong Rim; Kim, Jong Ku [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    The purpose of this study was to identify methods for improving the construct ability of nuclear power plants. This study reviewed several references of current construction practices of domestic and overseas nuclear plants in order to identify potential methods for improving construct ability. The identified methods for improving construct ability were then evaluated based on the applicability to domestic nuclear plant construction. The selected methods are expected to reduce the construction period, improve the quality of construction, cost, safety, and productivity. Selection of which methods should be implemented will require further evaluation of construction modifications, design changes, contract revisions. Among construction methods studied, platform construction methods can be applied through construction sequence modification without significant design changes, and Over the Top construction method of the NSSS, automatic welding of RCL pipes, CLP modularization, etc., are considered to be applied after design modification and adjustment of material lead time. (author). 49 refs., figs., tabs.

  18. Nuclear plant construction and investment risk

    International Nuclear Information System (INIS)

    Studness, C.M.

    1984-01-01

    Escalated cost estimations, delays and cancellations in nuclear construction have caused a preoccupation with the risks of nuclear power plant construction that dominates utility stock investment, overshadowing increased earnings per share and recent growth in production. The issue will be resolved when increased power demand requires new construction, but the effect has so far been to erode the economic advantage of nuclear power and threaten the ability of utilities to get rate increases high enough to cover their costs. Projected delays and cost escalations and their effects must go into an economic appraisal of the investment risks

  19. Enhancing quality of construction on nuclear facilities

    International Nuclear Information System (INIS)

    Buchert, K.P.

    1984-01-01

    From the author's viewpoint and the viewpoint of others, the quality of construction on both nuclear projects and many other non-nuclear projects has decreased. The trend toward recent QA and QC methods of contractors doing their own inspection has not only tended to reduce the quality of construction, but also has discouraged qualified inspectors from accepting positions where this type of QA and QC is practiced. In addition, the methods have decreased the desired interaction between design engineers and construction management. The paper contains detailed recommendations on how the quality of construction can be enhanced on nuclear projects. It is also shown that construction quality must be obtained by different methods than those used to obtain manufacturing quality

  20. A probabilistic model for US nuclear power construction times

    International Nuclear Information System (INIS)

    Shash, A.A.H.

    1988-01-01

    Construction time for nuclear power plants is an important element in planning for resources to meet future load demands. Analysis of actual versus estimated construction times for past US nuclear power plants indicates that utilities have continuously underestimated their power plants' construction durations. The analysis also indicates that the actual average construction time has been increasing upward, and the actual durations of power plants permitted to construct in the same year varied substantially. This study presents two probabilistic models for nuclear power construction time for use by the nuclear industry as estimating tool. The study also presents a detailed explanation of the factors that are responsible for increasing and varying nuclear power construction times. Observations on 91 complete nuclear units were involved in three interdependent analyses in the process of explanation and derivation of the probabilistic models. The historical data was first utilized in the data envelopment analysis (DEA) for the purpose of obtaining frontier index measures for project management achievement in building nuclear power plants

  1. Haiyang nuclear power construction management and practice

    International Nuclear Information System (INIS)

    Wang Fengxue

    2010-01-01

    The paper introduces the basic situation of Shandong Haiyang Nuclear Power Plant, as well as the management and progress of the project. Through the construction management practice, problems encountered in nuclear power construction are put forward for peer exchange and discussion. (author)

  2. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    There is no single satisfactory way to measure productivity in the construction industry. The industry is too varied, too specialized and too dependent upon vast numbers of interrelations between trades, contractors, designers and owners. Hence, no universally reliable indices for measuring construction productivity has been developed. There are problems that are generic to all large union-built nuclear power plants. The actions of any one owner cannot rectify the shortcomings of the construction industry. The generic problems are being identified, and many national organizations are attempting to make the construction industry more productive by recommending various changes

  3. Construction Technologies for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2011-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world'. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Statute Article III, A.6, the IAEA safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on and practical application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. There are three distinct significant phases in a nuclear power plant (NPP) project after the signing of a contract; engineering, procurement, and construction and commissioning. Experience gained over the last forty years has shown that the construction phase is one of the most critical phases for the success of a project. Success is defined as completing the project with the specified quality, and within budget and schedule. The key to a successful construction project is to have an established programme that integrates the critical attributes into the overall project. Some of

  4. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  5. Nuclear power generation as seen from construction aspect

    International Nuclear Information System (INIS)

    Osaki, Yorihiko

    1984-01-01

    The measures to vitalize atomic energy industry in low economical growth age are grasped from the viewpoint of heightening the quality of technology, and the improvement of the economical efficiency of nuclear power generation as seen from construction aspect is discussed. By 2000, the nuclear power generation in Japan will be increased by about four times to 62 million kW, and the proportion of nuclear power increases steadily. Recently, the nuclear power stations in Japan have been stably operated at high level, and the capacity ratio has exceeded 70 %. However, the power generation cost tends to rise, and it is feared that the economical advantage over thermal power will be lost. Recently, the construction cost of nuclear power plants has continued to rise, which causes the high cost of nuclear power. The reason of the high construction cost is in short too much quantity of materials and long construction period. As the proposal to reduce the construction cost, three stages of the rationalization are discussed, such as the rationalization of simulated earthquake for design and the improvement of reactor building design. The promotion of technical development is indispensable for the cost reduction. (Kako, I.)

  6. Construction Improvement for the Korean Nuclear Program

    International Nuclear Information System (INIS)

    Yang, T. E.

    1992-01-01

    Construction of the nine Nuclear plants requires an enormous financial investment. The decision to build a nuclear unit is based on both economic and resource requirements. Korea has few natural resources to use for power generation so the use of diversified fuel sources is a part of the planning process. Nuclear has historically had economic advantages over the fossil fueled plant, however, this advantage has been reduced. This is mainly due to increasing decommissioning and waste disposal costs plus the financial outlays associated with gaining public acceptance of new nuclear units. One of the principal means to recover the economic advantage of a nuclear plant is to shorten the time needed for construction. Every extra day of construction costs large sums of money in interest and escalation expenses alone. The challenge is to shorten the construction period to the minimum feasible time and thereby reduce the financing costs. The methods that have to be employed to achieve this goal require the total commitment from the management of all entities involved in the program. Through the application of advanced management and construction techniques a new era in the construction of nuclear plants in Korea will occur. This will include changes to the methods used for managing, planning, licensing, designing and constructing the new plants. The ability to meet the aggressive plan for the construction of new nuclear power plants in Korea rests in the hands of the managers of all the parties involved. These men set all the rules by which the new plants will be constructed. It is their responsibility to tackle the current problems and develop the solutions to enable the plan to be realized. The changes suggested within this paper are major, but the potential benefits will allow the Korean Nuclear Industry to advance into the twenty first Century as a leader. The number of fully trained specialists needed to make this happen will not appear overnight. They will have to be

  7. Research and exploration on nuclear safety culture construction

    International Nuclear Information System (INIS)

    Zhang Lifang; Zhao Hongtao; Wang Hongwei

    2012-01-01

    This thesis mainly researched the definition, characteristics, development stage and setup procedure concerning nuclear safety culture, based on practice and experiences in Technical Physics Institute of Heilongjian. Academy of Science. The author discussed the importance of nuclear safety culture construction for an enterprise of nuclear technology utilization, and emphasized all the enterprise and individual who engaged in nuclear and radiation safety should acquire good nuclear safety culture quality, and ensure the application and development of the nuclear safety cult.ure construction in the enterprises of nu- clear technological utilization. (authors)

  8. Toshiba's developments on construction techniques of nuclear power plants

    International Nuclear Information System (INIS)

    Hayashi, Y.; Itoh, N.

    1987-01-01

    Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation

  9. Nuclear power plant equipment design and construction rules

    International Nuclear Information System (INIS)

    Boiron, P.

    1983-03-01

    Presentation of the AFCEN (French association for nuclear power plant equipment design and construction rules) working, of its edition activity and of somes of its edited documents such as RCC-C (design and construction rules for PWR power plant fuel assemblies) and RCC-E (design and construction rules for nuclear facility electrical equipments) [fr

  10. Problems and prospects of nuclear power plants construction

    Directory of Open Access Journals (Sweden)

    Pergamenshhik Boris Klimentyevich

    2014-02-01

    Full Text Available 60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training.

  11. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  12. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  13. Analysis of nuclear-power construction costs

    International Nuclear Information System (INIS)

    Jansma, G.L.; Borcherding, J.D.

    1988-01-01

    This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures

  14. Quality control of Ling'ao nuclear power station civil construction

    International Nuclear Information System (INIS)

    Lu Buliang; Ye Changyuan

    2001-01-01

    Based on the quality control model adopted during Ling'ao Nuclear Power Station construction, the author briefly introduces quality control process of some main civil construction activities (reinforced concrete, steel liner, steel works and prestressing force) of nuclear power station, and makes some descriptions on non-conformance control of civil works. These quality control processes described come from the concrete practice during civil construction of Ling'ao Nuclear Power Station, and are based on Daya Bay Nuclear Power Station construction experience

  15. Construction-man hour estimation for nuclear power plants

    International Nuclear Information System (INIS)

    Paek, J.H.

    1987-01-01

    This study centers on a statistical analysis of the preliminary construction time, main construction time, and total construction man hours of nuclear power plants. The use of these econometric techniques allows the major man hour driving variables to be identified through multivariate analysis of time-series data on over 80 United States nuclear power plants. The analysis made in this study provides a clearer picture of the dynamic changes that have occurred in the man hours of these plants when compared to engineering estimates of man hours, and produces a tool that can be used to project nuclear power plant man hours

  16. Progress in resolving construction issues on nuclear projects

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1985-01-01

    The cost of nuclear plant construction in the United States can be drastically reduced. Progress is being made in the reduction of construction costs and with continuing effort much more can be done. The easiest way to attack high costs is to eliminate the unnecessary repairs and rework in construction, along with the time consuming evaluations and dispositions, and to use common sense in design practices. By doing this, millions of dollars could easily be cut from the cost of construction of nuclear powerplants

  17. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  18. The innovation and application of the nuclear power construction management information system MISNPC

    International Nuclear Information System (INIS)

    Wang Kaihua; Tang Zihui; Zhang Baiqi; Sun Guangwei; Zhu Guodong; Qian Fuhua

    2009-01-01

    This paper focuses on introducing the innovation achievements on the management information system of nuclear power construction (MISNPC). The innovation is achieved through summarizing the practice of nuclear power construction in China and drawing on advanced experience of international nuclear power construction. The innovation, including the management standard for nuclear power construction, the standard of construction process, the standard of nuclear-power basic codes and the standard for nuclear power construction and control, can be rapidly copied for application in various nuclear power construction projects. The application of the innovation may play an essential role in ensuring safe construction and operation of nuclear power plants in China and improving economic benefits. (authors)

  19. Design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Meiswinkel, Ruediger; Meyer, Julian; Schnell, Juergen

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply. Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overview from approval aspects given by nuclear and construction law, with special attention to the interface between plant and construction engineering, to a building structure classification. All life cycle phases are considered, with the primary focus on execution. Accidental actions on structures, the safety concept and design and fastening systems are exposed to a particular treatment. Selected chapters of the German concrete yearbook ''Beton-Kalender'' are now available in English. The new English BetonKalender Series delivers internationally useful engineering expertise and industrial know-how from Germany.

  20. Methodology for modular nuclear plant design and construction

    International Nuclear Information System (INIS)

    Lapp, C.W.; Golay, M.

    1992-01-01

    During the past decade, the rising cost of nuclear power plant construction has caused the cancellation of many projects and has forced some utilities into bankruptcy. Many factors have contributed to capital cost increases, including regulatory changes, the absence of standard designs, and low worker productivity. Low worker productivity can be attributed to the conventional building process, which is not conductive to productive labor. This study presents innovative ways to reduce the capital cost of nuclear plants through more efficient construction processes designed to increase worker productivity. A major portion of the plant capital cost is the interest paid during construction on borrowed capital. Modular fabrication could potentially reduce interest payments by compressing the construction schedule of nuclear facilities. Additional cost savings expected from modular designs arise from improved quality, productivity, and schedule control in fabrication of plant elements within a factory environment

  1. A Study on Nonconformance and Construction Method Improvement for Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Jong Yeob; Roh, Myung Sub

    2014-01-01

    Advanced power reactor was developed by domestic technology, and finally exported to abroad. In order to place the current nuclear power industrial base, construction has played a big role. Without magnificent construction technology, it would have been impossible to get a safe nuclear power plant on time and in budget. Construction industry occupies very large portion of the economy in South Korea and it has been a core of South Korea's economic growth. With a competitive construction industry and advanced nuclear power plant construction know-how, South Korea could provide safe and reliable nuclear power plants in domestic and world. However there are many repairs and number of corrective actions are in actual construction. Thus, this paper suggested the result of nonconformance and construction method improvement for nuclear power plant. Constructional engineering is a kind of science that has a variety of disciplines including structure, geology, mechanical equipment and other fields. Thus, the development of constructional engineering is closely associated with experience from failure and application advanced construction method. The recent experience in nuclear power plants construction has shown that those improved methods are fully applicable and can help shorten the construction schedule. The future of nuclear power plant construction seems to be more encouraged, even though it has many obstacles

  2. [Risk communication in construction of new nuclear power plant].

    Science.gov (United States)

    He, Gui-Zhen; Lü, Yong-Long

    2013-03-01

    Accompanied by construction of new nuclear power plants in the coming decades in China, risk management has become increasingly politicized and contentious. Nuclear risk communication is a critical component in helping individuals prepare for, respond to, and recover from nuclear power emergencies. It was discussed that awareness of trust and public attitudes are important determinants in nuclear power risk communication and management. However, there is limited knowledge about how to best communicate with at-risk populations around nuclear power plant in China. To bridge this gap, this study presented the attitudinal data from a field survey in under-building Haiyang nuclear power plant, Shandong Province to measure public support for and opposition to the local construction of nuclear power plant. The paper discussed the structure of the communication process from a descriptive point of view, recognizing the importance of trust and understanding the information openness. The results showed that decision-making on nuclear power was dominated by a closed "iron nuclear triangle" of national governmental agencies, state-owned nuclear enterprises and scientific experts. Public participation and public access to information on nuclear constructions and assessments have been marginal and media was a key information source. As information on nuclear power and related risks is very restricted in China, Chinese citizens (51%) tend to choose the government as the most trustworthy source. More respondents took the negative attitudes toward nuclear power plant construction around home. It drew on studies about risk communication to develop some guidelines for successful risk communication. The conclusions have vast implications for how we approach risk management in the future. The findings should be of interest to state and local emergency managers, community-based organizations, public health researchers, and policy makers.

  3. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  4. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  5. Construction, Maintenance and Demolition of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Smet, Camiel de [Hilti Corporation, P.O. Box 333, FL-9494 Schaan (Liechtenstein)

    2008-07-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  6. Construction, Maintenance and Demolition of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Smet, Camiel de

    2008-01-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  7. Construction of overseas nuclear power plants for first time by Japanese industry

    International Nuclear Information System (INIS)

    Maruyama, Tohru; Naruse, Yoshihiro; Yabuta, Hitoshi

    2010-01-01

    In response to the worldwide demand for stable energy supplies and the reduction of greenhouse gas emissions, nuclear power plant construction projects have been expanding on a global scale. Even in the United States, where no nuclear power plants have been constructed over the past 30 years, there are plans for the construction of more than 30 plants. Toshiba has been awarded a contract for a nuclear power plant construction project in the U.S., the first case of overseas nuclear power plant construction by Japanese industry. Toshiba America Nuclear Energy Corporation (TANE), the first U.S. subsidiary in our nuclear business, located in Charlotte, North Carolina, is engaged in this globally prominent project, applying various technologies and know-how that we have cultivated over many years of experience in developing and constructing nuclear power plants in Japan and adapting them to U.S. business practices, laws, and regulations. (author)

  8. Notes on organization of nuclear power station construction

    International Nuclear Information System (INIS)

    Marsicanin, B.

    1977-01-01

    After a visite to some european nuclear power stations under construction and in operation, in this report a short general view on this subject is given. The progress in this in large, industrialised countries is considered as well as the relevant experience in developing countries. The new role of nuclear research institutes during construction and operation is pointed out and prospects of this cooperation evaluated. (author)

  9. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  10. HSE management for AP1000 nuclear plant construction in EPC mode

    International Nuclear Information System (INIS)

    He Xiaogang; Wei Zhong

    2010-01-01

    As a new nuclear type, AP1000 will become the development direction of Chinese nuclear project. EPC General Contract mode is favored by nuclear owners both at home and abroad. Therefore, there is necessity for studying HSE management system and method suitable for AP1000 nuclear plant construction (ANPC) based on combination of AP1000 construction characters in EPC mode. This can not only ensure safety for ANPC but also positively promote national nuclear power development. For this reason, based on site HSE management of the first AP1000 nuclear plant under construction, HSE management system and method for ANPC in EPC mode was proposed after analysis of the character of EPC mode and ANPC character. It is hoped that it will be helpful for safe construction for ANPC. (authors)

  11. Design and construction of nuclear power plants

    CERN Document Server

    Schnell, Jürgen; Meiswinkel, Rüdiger; Bergmeister, Konrad; Fingerloos, Frank; Wörner, Johann-Dietrich

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply.Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overv

  12. STACY and TRACY: nuclear criticality experimental facilities under construction

    International Nuclear Information System (INIS)

    Kobayashi, I.; Takeshita, I.; Yanagisawa, H.; Tsujino, T.

    1992-01-01

    Japan Atomic Energy Research Institute is constructing a Nuclear Fuel Cycle Safety Engineering Research Facility, NUCEF, where the following research themes essential for evaluating safety problems relating to back-end technology in nuclear fuel cycle facilities will be studied: nuclear criticality safety research; research on advanced reprocessing processes and partitioning; and research on transuranic waste treatment and disposal. To perform nuclear criticality safety research related to the reprocessing of light water reactor spent fuels, two criticality experimental facilities, STACY and TRACY, are under construction. STACY (Static Criticality Facility) will be used for the study of criticality conditions of solution fuels, uranium, plutonium and their mixtures. TRACY (Transient Criticality Facility) will be used to investigate criticality accident phenomena with uranium solutions. The construction progress and experimental programmes are described in this Paper. (author)

  13. Nuclear power plant containment construction

    International Nuclear Information System (INIS)

    Schabert, H.P.; Danisch, R.; Strickroth, E.

    1975-01-01

    The Nuclear Power Plant Containment Construction includes the spherical steel safety enclosure for the reactor and the equipment associated with the reactor and requiring this type of enclosure. This steel enclosure is externally structurally protected against accident by a concrete construction providing a foundation for the steel enclosure and having a cylindrical wall and a hemispherical dome, these parts being dimensioned to form an annular space surrounding the spherical steel enclosure, the latter and the concrete construction heretofore being concentrically arranged with respect to each other. In the disclosed construction the two parts are arranged with their vertical axis horizontally offset from each other so that opposite to the offsetting direction of the concrete construction a relatively large space is formed in the now asymmetrical annular space in which reactor auxiliary equipment not requiring enclosure by the steel containment vessel or safety enclosure, may be located outside of the steel containment vessel and inside of the concrete construction where it is structurally protected by the latter

  14. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  15. Big five general contractors dominate civil construction market of nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The Japanese construction industry is a key industry accounting for about 20 % of the GNP, and the investment in construction amounted to 51,200 billion yen in fiscal 1984. 515,000 firms employing about 5.5 million workers belong to the industry. 99.4 % of these firms is the enterprises capitalized at less than 100 million yen, and most of them are small self-employment enterprises. The Construction Business Law provides that those who wish to engage in construction are required to obtain a permit from the Construction Ministry or from a local prefectural governor. There are big five and seven sub-major construction companies in Japan. The big five formed the tie-up relations with three nuclear reactor manufacturers. 76 civil engineering and construction companies recorded the sales related to nuclear power in 1983 amounting to 330.9 billion yen, equivalent to 21 % of the total nuclear-related sales. The construction of nuclear power plants and the characteristics of the construction, and the activities of the big five in the field of nuclear industry are reported. (Kako, I.)

  16. Construction and commissioning experience of evolutionary water cooled nuclear power plants

    International Nuclear Information System (INIS)

    2004-04-01

    Electricity market liberalization is an established fact in several countries and there is a trend to adopt it in other countries. The essential aim of market liberalization is to improve the overall economic efficiency. In order that nuclear power remains a viable option for electricity generation, its costs should be competitive with alternative sources while, at the same time, it should have a safe and reliable operation record. The capital cost of nuclear power plants (NPPs) generally accounts for 43-70% of the total nuclear electricity generation costs, compared to 26-48% for coal plants and 13-32% for gas plants. Most of these expenditures are incurred during the construction phase of a NPP. The achievement of shorter construction periods using improved technology and construction methods has a significant benefit on the costs incurred prior to any production of electricity. This document is intended to make the recent worldwide experience on construction and commissioning of evolutionary water cooled NPPs available to Member States and especially to those with nuclear power plants under construction/planning, and to those seriously considering nuclear power projects in the future. The final aim is to assist utilities and other organizations in Member States to improve the construction of nuclear power plants and achieve shortened schedules and reduced costs without compromising quality and safety. This document aims to provide an overview of the most advanced technologies, methods and processes used in construction and commissioning of recent nuclear projects. To better achieve this objective the presentation is selectively focused more on the new developments rather than providing a full review of all issues related to construction and commissioning. The experience described in this TECDOC applies to managers, engineers, supervisors, technicians and workers in various organizations dealing with the site construction and commissioning of nuclear power plants

  17. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  18. Construction Cost Growth for New Department of Energy Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kubic, Jr., William L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-05-25

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

  19. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  20. Construction of APR1000 nuclear power information management system based on international standards

    International Nuclear Information System (INIS)

    Choi, Seung Hwan; Song, Deok Yong; Han, Byung Sub; An, Kyung Ik; Hwang, Jin Sang

    2010-01-01

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  1. Construction of APR1000 nuclear power information management system based on international standards

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Seung Hwan [Korea Electric Power Research Institute, Daejeon (Korea, Republic of); Song, Deok Yong; Han, Byung Sub [Enesys Co., Daejeon (Korea, Republic of); An, Kyung Ik; Hwang, Jin Sang [PartDB Co., Daejeon (Korea, Republic of)

    2010-10-15

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  2. Improved monolithic reinforced concrete construction for nuclear power stations

    International Nuclear Information System (INIS)

    Guenther, P.; Fischer, K.

    1983-01-01

    Experience has shown that in applying monolithic reinforced concrete in nuclear power plant construction the following auxiliary means are useful: measuring sheets in assembling, welding gauges for reaching high tolerance accuracies of prefabricated reinforced concrete members, suitable lining materials, formwork anchorage and formwork release agents, concrete workability agents, mechanized procedures for finishing and assembling. These means were successfully tested in constructing the Greifswald nuclear power station

  3. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Aspden, G.J.

    1980-01-01

    A nuclear reactor construction comprising a reactor core submerged in a pool of liquid metal coolant in a primary vessel which is suspended from the roof structure of a containment vault. Control rods supported from the roof structure are insertable in the core which is carried on a support structure from the wall of the primary vessel. To prevent excessive relaxation of the support structure whereby the control rods would be displaced relative to the core, the support structure incorporates a normally inactive secondary structure designed to become effective in bracing the primary structure against further relaxation beyond a predetermined limit. (author)

  4. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  5. Current problems associated with nuclear plant construction contracts

    International Nuclear Information System (INIS)

    Albano, Raffaele.

    1977-01-01

    The expansion of nuclear electricity generating programmes has brought to the fore the problems associated with construction of this type of power plant. The paper analyses the contracts for such construction and describes the most common, the turnkey contract. The present tendency is to limit the scope of turnkey contracts to the nuclear system or simply to the reactor and this is especially common in advanced nuclear countries such as the US, Canada, Japan, UK and France, and this is also the case in Italy where the question of contracting nuclear plants is debated. In Germany the power utilities hold a large number of shares in the manufacturing industry and the turnkey contract is therefore more economically attractive. A detailed description of the contracting procedure is provided, including the suppliers' and purchasers' responsibilities, plant commissioning tests and handing over of the plant to the operator. (NEA) [fr

  6. Constructibility issues associated with a nuclear waste repository in basalt

    International Nuclear Information System (INIS)

    Turner, D.A.

    1981-01-01

    This report contains the text and slide reproductions of a speech on nuclear waste disposal in basalt. The presentation addresses the layout of repository access shafts and subsurface facilities resulting from the conceptual design of a nuclear repository in basalt. The constructibility issues that must be resolved prior to construction are described

  7. Development and construction of nuclear power and nuclear heating stations in the USSR

    International Nuclear Information System (INIS)

    Schmidt, G.; Kirmse, B.

    1983-01-01

    The state-of-the-art of nuclear power technology in the USSR is reviewed by presenting characteristic data on design and construction. The review takes into consideration the following types of facilities: Nuclear power stations with 1000 MWe pressurized water reactors, with 1000 MWe pressure tube boiling water reactors, and with 600 MWe fast breeder reactors; nuclear heating power stations with 1000 MWe reactors and nuclear heating stations with 500 MWth boiling water reactors

  8. Geodesy problems in nuclear power plant construction

    International Nuclear Information System (INIS)

    Eory, K.

    1981-01-01

    The special geodetic problems encountered during the construction of the Paks nuclear power plants are treated. The main building with its hermetically connected components including the reactor, the steam generators, the circulation pumps etc. impose special requirements on the control net of datum points. The geodesy tasks solved during the construction of the main building are presented in details. (R.P.)

  9. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthelemy, Michel; Escobar Rangel, Lina

    2013-01-01

    This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer (A- E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. (authors)

  10. New experience on construction and installation work in Qinshan PHWR nuclear power plant

    International Nuclear Information System (INIS)

    Lu Huaxiang

    2004-01-01

    The article provides a summary of the new experience on construction management and construction technology in the field of civil construction and installation work in Qinshan PHWR nuclear power plant, with focus on innovation in project management mode, new technology application and computerized management of construction and installation work. Management innovation, technical innovation and information technology are the key contributors to overall success of Qinshan PHWR nuclear power plant in construction and installation work. The new experience derived in these fields will be of great significance to promote independent construction of the new-round nuclear power projects in China. (author)

  11. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    International Nuclear Information System (INIS)

    Kim, Woojoong; Ryu, Dongsoo; Jung, Youngsoo

    2014-01-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation

  12. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woojoong, E-mail: minidung@nate.com [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Ryu, Dongsoo, E-mail: energyboy@khnp.co.kr [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Jung, Youngsoo, E-mail: yjung97@mju.ac.kr [College of Architecture, Myongji University, Yongin 449-728 (Korea, Republic of)

    2014-04-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation.

  13. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthélemy, Michel; Escobar Rangel, Lina

    2015-01-01

    This paper provides an econometric analysis of nuclear reactor construction costs in France and the United States based on overnight costs data. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using change in expected electricity demand as instrument. We argue that the construction of nuclear reactors can benefit from standardization gains through two channels. First, short term coordination benefits can arise when the diversity of nuclear reactors' designs under construction is low. Second, long term benefits can occur due to learning spillovers from past constructions of similar reactors. We find that construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect–Engineer. In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. -- Highlights: •This paper analyses the determinants of nuclear reactors construction costs and lead-time. •We study short term (coordination gains) and long term (learning by doing) benefits of standardization in France and the US. •Results show that standardization of nuclear programs is a key factor for reducing construction costs. •We also suggest that technological progress has contributed to construction costs escalation

  14. The socio-economic impacts on regional areas as a result of new nuclear construction and nuclear decommissioning

    International Nuclear Information System (INIS)

    Devine, J. Michael

    2010-01-01

    Large social and economic impacts are caused by new nuclear construction and eventual shutdown of operations and decommissioning. When new construction begins, the impact on the local area is enormous. The influx of construction workers and businesses to provide services and goods usually overwhelms the area which previously may have had a minimal amount of infrastructure and little population. Also, given that many of the current nuclear facilities worldwide are located in somewhat remote regions, they have become the primary source of jobs for those regions. When these facilities shut down and go into decommissioning, there can be several adverse effects upon the region or area. This paper will address some of the primary socio-economic influences of both new nuclear construction and subsequent decommissioning. (author)

  15. Quality assurance in the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Bernsen, S.A.

    1975-01-01

    A general survey of quality-assurance (QA) practices as they relate to the construction phase of nuclear power plants is presented. The article briefly outlines the evolution of construction QA requirements, describes construction practices and organizational relations that help identify the unique construction-phase features that affect QA practices, identifies some of the principal requirements and programmatic problems involving construction, and discusses potential trends and suggested guidelines for the implementation of particular practices. (U.S.)

  16. Construction of nuclear special information service

    International Nuclear Information System (INIS)

    Oh, Jeong Hoon; Kim, Tae Whan; Yi, Ji Ho; Chun, Young Choon; Yoo, Jae Bok; Yoo, An Na; Choi, Heon Soo

    2012-01-01

    Domestic INIS project has carried out various activities on supporting a decision-making for INIS Secretariat, exchanges of the statistical information between INIS and the country, and technical assistance for domestic end-users using INIS database. Based on the construction of INIS database sent by member states, the data published in the country has been gathered, collected, and inputted to INIS database according to the INIS reference series. Using the INIS output data, it has provided domestic users with searching INIS CD-ROM DB, INIS online database, INIS SDI service, and non-conventional literature delivery services. INIS2 DB Host site in Korea has serviced users of domestic and INIS member countries. In order to maintain the same data as Vienna center, the data update process has been performed. Also, publicity information activities were performed by many ways. To construct digital information infrastructure, we changed web server of KORNIS21 and we reconstruct digital library system as separation of KAERI network system. We constructed patent trend analysis system and new SDI service system. Also we collected Web DB, digital journals and so on and made an effort on operation of knowledge management system and research documents management. We have inputted over 4,000 records per year since 2009 and the input amount this year has reached 4,284 records. In order to input the comprehensive domestic publication related to nuclear energy, and rise in position of the national center, it is necessary to continue efforts and support budgets. We expect the INIS2 DB Host site will make a contribution to the improvement of productivity in the nuclear energy research as well as the diffusion of information about nuclear energy. We provided users with stable services changing web server of KORNIS21. Also we contributed to the improvement of researcher's productivity by constructing patent trend analysis system, new SDI service system and provided users with services

  17. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  18. Discussion on the nuclear information resources co-constructing and sharing under network information

    International Nuclear Information System (INIS)

    Wu Yang

    2010-01-01

    During the tenth five-year plan, along with the digitization of information, and the development of information transmission network, the co-construction and sharing of China's nuclear industry information is facing a new development opportunities and challenges. This paper is based on the analysis of the nuclear library status and characteristics, combined of the development process of nuclear information resources over the past 20 years. For the characteristic of information sharing and services in the net environment, the problem in the current co-construction and sharing of nuclear information, and the needs of the future nuclear research and development of nuclear production, this paper forecast the work trends of nuclear information, and gives some countermeasure to strength the development of the co-construction and sharing of nuclear information. (author)

  19. The analysis of energy-time sequences in the nuclear power plants construction

    International Nuclear Information System (INIS)

    Milivojevic, S.; Jovanovic, V.; Riznic, J.

    1983-01-01

    The current nuclear energy development pose many problems; one of them is nuclear power plant construction. They are evaluated energy and time features of the construction and their relative ratios by the analysis of available data. The results point at the reached efficiency of the construction and, in the same time, they are the basis for real estimation of energy-time sequences of the construction in the future. (author)

  20. Modularization in construction processes New Nuclear Power Plants

    International Nuclear Information System (INIS)

    Martinez, I.; Cobos, A.; Herrera Ropero, D.

    2012-01-01

    The aim of this work is that it has the capacity and expertise to analyze the suitability of modular technology design and construction compared to conventional nuclear plants. It will define the criteria for selecting the areas of modularity and the impact on design and its interfaces with engineering, supply, including logistics and construction.

  1. The supply chain of civil construction industries for support the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana; Moch-Djoko Birmano; Sahala Lumbanraja; Nurlaila

    2013-01-01

    The use of domestic products for electricity infrastructure has been set out in the Ministerial Decree number: 54/M-IND/PER/3/2012, but the infrastructure of nuclear power plants (NPP) construction has not been included. Therefore, the potential of the local industries needs to be mapped it especially supply chain of civil construction industries to estimate the capability of the local component level (DCL) at the nuclear power plant project in Indonesia. NPP is a high-technology so that if NPP will be constructed, it is necessary to involve the national capability as media technology transfer, especially for EPC (Engineering, Procurement and Construction) services. Civil construction (civil part) play role is very large, about 21%. Therefore it is necessary in particular the role of the national civil construction industry to increase the capability of local content. Preparation of Civil construction infrastructure are depend on the supply chain of raw materials. The aim of the research was to map the supply chain of the civil construction industries. Methodology this study is a survey of national industries, literature review, and searching web site. The result study is a map of civil construction industries with raw material supply chain. (author)

  2. EVMS for nuclear power plant construction: status and implementation

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.; Park, S. Y.

    2012-01-01

    The Earned Value Management System (EVMS) method integrates three critical elements of project management scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows for casting of project cost and schedule at completion and highlights the possible need for corrective action. It is anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners. This paper is to review the status of EVMS and its effective implementation to nuclear power plant construction

  3. Construction of ideas and practice for 'nuclear geology featured database'

    International Nuclear Information System (INIS)

    Hu Guanglin; Feng Kai

    2010-01-01

    East China Institute of Technology is engaged in training person in areas of Nuclear Resource exploration. It is Nuclear Featured multi-Institute of Technology. At present, our library was done several collections system, which were focusing on Uranium and Geology. The library decide to be organizational force to construct Nuclear and Geology Featured database and put into use as soon as possible. 'Nuclear Geology Featured Database' put forward for construction principles of uniqueness, standardization, completeness, practicality, security and respecting knowledge property rights. The database contains 'Map and Table', 'periodical thesis', 'dissertations', 'conference papers', newspapers', 'books', ect. The types of literatures mainly includes monographs, periodicals, dissertations, conference papers, newspapers, as well as videos. The database can get information by ways of searching titles, authors and texts, and gradually become a more authoritative Nuclear Geology Database for study. (authors)

  4. Preassembly method for construction of nuclear power station

    International Nuclear Information System (INIS)

    Shimazaki, Yasuyoshi

    1986-01-01

    Recently preassembly method for construction are generally popular in Japan and this trend is prevailing all over the world. They provide good solutions to the problems that the Japanese construction industry faces and also they meet the needs for construction of nuclear power plants having heavily reinforced concrete structures. We have already established basic technologies for the methods, developing more advanced methods (more systematic, larger sized, more applicable, etc.). In the near future, they will be further developed up to a complete system called 'Industrialized construction method'. This system will include the use of precast concrete component, steel concrete composit structures and construction robots. (author)

  5. Application and development analysis of nuclear power plant modular construction

    International Nuclear Information System (INIS)

    Fang Xiaopeng

    2015-01-01

    Modular Construction is currently one of the major development trends for the nuclear power plant construction technology worldwide. In the first-of-a-kind AP1000 Nuclear Power Project practiced in China, the large-scale structural modules and mechanical modules have been successfully fabricated, assembled and installed. However, in the construction practice of the project, some quality issues are identified with the assembly and installation process of large-scale structural modules in addition to the issue of incomplete supply of mechanical modules, which has failed to fully demonstrate the features and merits of modular construction. This paper collects and consolidates the issues of modular construction of AP1000 first of a kind reactor, providing root cause analysis in the aspects of process design, quality control, site construction logic, interface management in the process of module fabrication, assembly and installation; modular construction feasibility assessment index is proved based on the quantification and qualitative analysis of the impact element. Based on the modular construction feasibility, NPP modular construction improvement suggestions are provided in the aspect of modular assembly optimization definition, tolerance control during the fitting process and the construction logic adjustment. (author)

  6. Self-reliance and innovation to improve the localization ability of nuclear power construction

    International Nuclear Information System (INIS)

    Wu Chongming

    2008-01-01

    Construction is a crucial link in the course of design, site selection, construction and operation for a nuclear power plant. The quality during construction directly affects the nuclear safety. And the construction quality involves various aspects including quality culture, feasibility of construction technique, quality assurance, and quality control. Through technical management innovation, great achievements have been made in the civil construction of Unit 3 of Qinshan II Extension Project. As a result, the construction period was shortened and the concrete quality reached the fairfaced concrete standard. (authors)

  7. Canadian nuclear power plant construction cost forecast and analysis

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequence of the decision as possible. This understanding must be provided by the evaluation of the situation to take place in the future. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A data base is built and indexes are prepared. Based on these indexes an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of forty years are generated and applications of alternative scenario forecasts and range forecasts to uncertainty assessment are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the very first ever done for Canadian NGS constructions

  8. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  9. The innovation of nuclear science and technology supporting for the central plains economic zone construction

    International Nuclear Information System (INIS)

    Yang Xiaowei

    2014-01-01

    This paper discusses the nuclear agronomy support for the central plains economic zone construction, radiation chemical new material support for the central plains economic zone construction, nuclear medical support for the central plains economic zone construction, nuclear instrument and meter industry support for the central plains economic zone construction and the development trend of related disciplines. (author)

  10. Licensing for the construction of 'Almirante Alvaro Alberto' nuclear power plant

    International Nuclear Information System (INIS)

    1974-09-01

    The BRAZILIAN NUCLEAR ENERGIA COMMISSION (Comissao Nacional de Energia Nuclear - CNEN) presents in Report n 0 51 of its Reactors Department all the requirements for the construction permit of 'Almirante Alvaro Alberto' Nuclear Power Plant [pt

  11. Construction risks of nuclear power plants for use in cost-effectiveness considerations

    International Nuclear Information System (INIS)

    Bock-Werthmann, W.

    1986-08-01

    The construction risk study is concerned with a nuclear power station of 1300 MW(e) design output. The risk figures obtained demonstrate that construction risks of nuclear power plants form a substantial share of the total risk from all steps of the nuclear fuel cycle. When compared with other risk figures it is apparent that only the fatalities caused by the extraction of uranium are of similar magnitude. (55 references). (DG)

  12. Delays in nuclear power plant construction. Volume II. Final report

    International Nuclear Information System (INIS)

    Mason, G.E.; Larew, R.E.; Borcherding, J.D.; Okes, S.R. Jr.; Rad, P.F.

    1977-01-01

    The report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts which should minimize or eliminate the identified barriers. The identified barriers include (1) Design and Construction Interfacing Problems; (2) Problems Relating to the Selection and Use of Permanent Materials and Construction Methods; (3) Construction Coordination and Communication Problems; and (4) Problems Associated with Manpower Availability and Productivity

  13. Delays in nuclear power plant construction. Volume I. Final report

    International Nuclear Information System (INIS)

    1977-01-01

    The report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts which should minimize or eliminate the identified barriers. The identified barriers include: (1) Design and Construction Interfacing Problems; (2) Problems Relating to the Selection and Use of Permanent Materials and Construction Methods; (3) Construction Coordination and Communication Problems; and (4) Problems Associated with Manpower Availability and Productivity

  14. AP1000 plant construction in China: Ansaldo Nucleare contribution

    International Nuclear Information System (INIS)

    Frogheri, Monica; Saiu, Gianfranco

    2009-01-01

    On 24th of July 2007 Westinghouse Electric Co. signed landmark contracts with China's State Nuclear Power Technology Corporation (SNPTC), to provide four AP1000 nuclear power plants in China. The AP1000 is a two-loop 1117 MWe Pressurized Water Reactor (PWR). It is based on proven technology, but with an emphasis on safety features that rely on natural driving forces, such as pressurized gas, gravity flow, natural circulation flow and convection. Ansaldo Nucleare has provided a significant support to the passive plant technology development and, starting from 2000, is cooperating with Westinghouse to development of the AP1000 Plant. In the frame of the AP1000 Chinese agreement, Ansaldo Nucleare, in Joint Venture with Mangiarotti Nuclear, has signed a contract with Westinghouse for the design and the supply of innovative components to be installed in the first AP1000 unit to be constructed at the Sanmen site. The contract includes: the design of the steel containment vessel, preparation of construction and fabrication, specifications, design and supply of SCV mechanical penetrations, air locks and equipment hatches. Moreover, Ansaldo Nucleare is in charge of the final design of the AP1000 PRHR-HX and together with Mangiarotti Nuclear will supply the component for the Sanmen Unit 1 NPP. The paper presents an overview of the design and manufacturing activities performed by Ansaldo Nucleare and its partners for the AP1000 plant in China. (authors)

  15. Analysis on optimization of the critical path for civil construction period of Fangjiashan nuclear island constructed under EPC mode

    International Nuclear Information System (INIS)

    Liu Yongqing; Wu Youcong; Qiu Jinhong

    2011-01-01

    Based on the actual situation of nuclear island civil construction in Fangjiashan nuclear power plant and combined with the arrangement of the construction schedule, the analysis on optimization of the critical path for civil construction period is conducted. The result shows that on the premise of not increasing the contract price and the total engineering cost based on the original 57-month construction period, the construction period can be shorten to 21 month through strengthening the schedule control, keeping the critical work in a reasonable duration and rearranging the link between programmers. In addition, in view of the economic analysis, if we increase the mechanical engagement and adopt special method, the 2-month construction period can be even shortened to 20 months. (authors)

  16. Nuclear power plants: construction status report, data as of 6/30/82

    International Nuclear Information System (INIS)

    1982-10-01

    This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide information necessary for monitoring progress of all nuclear power plants which have Construction Permits. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  17. Nuclear power plants: construction status report, data as of 03/31/82

    International Nuclear Information System (INIS)

    1982-06-01

    This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide information necessary for monitoring progress of all nuclear power plants which have Construction Permits. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  18. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  19. Nuclear civil construction, an essential activity dedicated to outstanding projects

    International Nuclear Information System (INIS)

    Herve, G.

    2016-01-01

    The complexity of nuclear civil construction is directly linked to the safety requirements imposed on nuclear facilities: durability in terms of time, stability, containment, tightness, managing cracking and leakages, quality controls... These requirements imply specific measures for instance the concrete that is used for the containment building has a particular composition that gives it an enhanced resistance or the substantial thickness of the foundation raft implies monitoring the temperature at which the concrete is poured. The construction of the EPR at the Flamanville site is taken as an example. This construction involves 120.000 tonnes of concrete-reinforcement steels, 400.000 m"3 of concrete, 400 km of pipes and 1600 km of cables. (A.C.)

  20. Current status of construction of nuclear power plants No. 7, No. 8 in Korea

    International Nuclear Information System (INIS)

    Sug, S.H.

    1979-01-01

    The up-to-date accomplishment and future work in the construction of nuclear power plants in Korea are outlined. The scope of the construction project of the No. 7 and No. 8 power plants, selection of the suppliers of the main instruments, assessment of the planning, architecture, engineering, construction fund, procurement of nuclear fuel, and the necessities of home production of various nuclear materials are briefly summarized. (author)

  1. Application of RFID to High-Reliability Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Kenji Akagi; Masayuki Ishiwata; Kenji Araki; Jun-ichi Kawahata

    2006-01-01

    In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and general versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described. (authors)

  2. Application of RFID to High-Reliability Nuclear Power Plant Construction

    Energy Technology Data Exchange (ETDEWEB)

    Akagi, Kenji; Ishiwata, Masayuki; Araki, Kenji; Kawahata, Jun-ichi [Hitachi, Ltd. (Japan)

    2006-07-01

    In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and general versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described. (authors)

  3. Quality control of three main materials for civil construction of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Feng

    2011-01-01

    The construction and operation of nuclear power plant is a systematic engineering. To ensure quality and safety of nuclear power plants, each work from design to operation can have certain impact on the quality and safety of the project. The quality of each related work shall be controlled. Starting from the quality control over raw materials for the civil construction of nuclear power plant, this article mainly analyzes how to control the quality and manage the three main materials of steel, concrete and modular parts in the civil construction. (author)

  4. In nuclear civil construction, France benefits from a leading know-how and expertise

    International Nuclear Information System (INIS)

    Martin, F.

    2016-01-01

    EGIS is an enterprise that has been a partner for EDF and AREVA since the construction of the first nuclear power plant in France at Fessenheim in 1970. EGIS has a global competency for nuclear civil construction from design to the follow-up of the work. EGIS has taken part into the construction of the 3 first EPR in France, Finland and China and into the implementation of post-Fukushima measures in operating nuclear power plants. EGIS has developed a specific know-how for managing the seismic risk. (A.C.)

  5. Optimalisation of national industry participation in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sriyana

    2008-01-01

    A study of national industry participation based on recent data has already been conducted. The current industry data is used to estimate the optimum level of national industry participation in nuclear power plant (NPP) construction based on the prior study. The purpose of the study is to give a figure of the optimum level of national industry participation in NPP construction. The scope of the study is the NPP construction project in related to the potency of national industry to participate in the project. The methodology used in the study are literature study, web surfing for industrial data, and on-the-spot industry survey that are potential to participate in NPP construction. In addition to that, discussion with expertise of industrial practitioner was also conducted. The study concludes that (1) based on the recent national industry capability provided and compared to prior similar study, it is estimated that the level of national industry participation in the first NPP construction with the capacity of 1000 MWe PWR is about 40%. (2) to accelerate NPP technology transfer, we need to build a small size NPP. The nuclear island will be developed by BATAN in cooperation with national industry and the non-nuclear island will be developed by national industry. Universities and other academicians should be involved to support and keep the sustainability of man power availability in developing the NPP technology. (author)

  6. Construction of nuclear special information service

    International Nuclear Information System (INIS)

    Oh, Jeong Hoon; Kim, Tae Whan; Lee, Kyu Jeong; Yi, Ji Ho; Chun, Young Choon; Yoo, Jae Bok; Yoo, An Na

    2009-02-01

    Domestic INIS project has carried out various activities on supporting a decision-making for INIS Secretariat, exchanges of the statistical information between INIS and the country,and technical assistance for domestic end-users using INIS database. Based on the construction of INIS database sent by member states, the data published in the country has been gathered, collected, and inputted to INIS database according to the INIS reference series. Using the INIS output data, it has provided domestic users with searching INIS CD-ROM DB, INIS online database, INIS SDI service, and non-conventional literature delivery services. INIS2 DB Host site in Korea has serviced users of domestic and INIS member countries. In order to maintain the same data as Vienna center, the data update process has been performed. Also, publicity information activities were performed by many ways. To construct digital information infrastructure, we changed web server of NUCLIS21 and upgraded information management manager system and constructed full text DB on research and technical reports. Also we collected web DB, digital journals and so on and made an effort on operation of knowledge management system and research documents management. We have inputted over 3,000 records per year since 2002 and the input amount this year has reached 3,738 records. In order to input the comprehensive domestic publication related to nuclear energy, and rise in position of the national center, it is necessary to continue efforts and support budgets. We expect the INIS2 DB Host site will make a contribution to the improvement of productivity in the nuclear energy research as well as the diffusion of information about nuclear energy. We provided users with stable services changing web server of NUCLIS21. Also we contributed to the improvement of librarians' productivity by upgrading information management manager system and provided users with services of web DB, digital journals and so on

  7. Popularization of the role of nuclear power construction

    International Nuclear Information System (INIS)

    Zhang Ying

    2010-01-01

    Scientific popularization shall be promoted in advance before nuclear power development. Since it was founded, Jiangsu Nuclear Power Corporation (JNPC) has always focused on the popularization of nuclear power knowledge to enable the public understand and access to nuclear power. Adhering to the center 'Popularizing nuclear power knowledge, correct steering of the public, serving the construction of TNPS and promoting the corporation development', the way of 'going out and coming in' for publicizing nuclear power knowledge has been gradually formed in line with the principle of 'close to the society, close to the people and close to the life'. The scientific popularization resources have been deeply dug out, and the education mode innovated. The healthy and continuous development of scientific popularization and education work are recognized and appraised highly by all circles of the society. Nowadays, a good atmosphere of 'everyone contends to popularize nuclear power knowledge' has formed in JNPC, and internal and external popularization and education work have yielded good results, which have created favorable social environment for the safe, proper and fast development of Tianwan Nuclear Power Station. (author)

  8. Development of construction technology for nuclear power plants

    International Nuclear Information System (INIS)

    Schnellenbach, G.

    1975-01-01

    Stringent safety requirements for nuclear power plants create new technological problems in their construction. The development is influenced by the mode of operation of the respective reactors which leads to different construction styles of the reactor buildings. Accomodation of extraordinary load cases such as earthquake, airplane crash, and blast due to chemical explosions, requires additional treatment. Significant new problems arise for the prestressed concrete reactor pressure vessels and concrete containments, prestressed or reinforced. (orig.) [de

  9. Measurements of nuclear data and possibility to construct the nuclear data production facility based on electron linac

    Energy Technology Data Exchange (ETDEWEB)

    Namkung, Won; Ko, In Soo; Cho, Moo Hyun; Kim, Gui Nyun; Lee, Young Seok; Kang, Heung Sik [Pohang University of Science and Technology, Pohang(Korea)

    2001-04-01

    In order to construct an infrastructure to produce nuclear data, we studied three main items; (1) Study on the possibility to construct a facility for nuclear data production, (2) Production of nuclear data for nuclear power plant, and (3) Pulsed neutron source based on a 100-MeV electron linac at Pohang Accelerator Laboratory (PAL). We confirmed the possibility to build a nuclear data production facility utilizing a 100-MeV electron linac at PAL and manpower who wanted to participate the nuclear data production experiments. In order to measure the nuclear data for nuclear power plant, we used several nuclear data production facilities in abroad. We measured total cross sections and neutron caprure cross sections for {sup nat}Dy and {sup nat}Hf using the pulsed neutron facility in the Research Reactor Institute, Kyoto University (KURRI). The neutron capture cross sections for {sup 161,162,163,164}Dy were measured at KURRI in the neutron energy region between 0.001 eV and several tens keV, and at the fast neutron facility in Tokyo Institute of Technology in the neutron energy region between 10 keV and 100 keV. We also measured the neutron capture cross sections and gamma multiplicity of {sup 232}Th at the IBR30 in Dubna, Russia. We have construct a pulsed neutron source using a 100-MeV electron linac at PAL. We measured neutron time-of-flight (TOF) spectra in order to check the characteristics of the pulsed neutron source. We also measured a neutron total cross sections of W and Cu. The pulsed neutron facility can be utilized in the education facility for nuclear data production and the test facility for the R and D purpose of the nuclear data production facility. 29 refs., 57 figs., 22 tabs. (Author)

  10. Development of new construction technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Kawamata, Susumu; Itoh, Daisuke; Ichizono, Katsuyuki

    1995-01-01

    In order to proceed rationally with the construction of a nuclear power station, the followings are the subject to solve beside reducing the construction cost: shortening the construction period, improving the quality, and securing safety in the construction work. As a measure to solve the matters, we correctly construct the plant mainly applying 'all-weather proof construction method' and 'pre-assembled large-block construction method'. Furthermore, as the plant construction control system, we perform a construction work applying the design change management system, pre-assessment for safety, and the whole facility check. As a result of our effort, it was attained that when we compare the matured plant with the first unit, the construction cost is reduced by 30%, the construction period is shortened by 12 months, site manpower is decreased by 30%, and the plant had no sudden shutdowns even during the trial operation period. (author)

  11. Construction of a nuclear data server using TCP/IP

    Energy Technology Data Exchange (ETDEWEB)

    Kawano, Toshihiko; Sakai, Osamu [Kyushu Univ., Fukuoka (Japan)

    1997-03-01

    We construct a nuclear data server which provides data in the evaluated nuclear data library through the network by means of TCP/IP. The client is not necessarily a user but a computer program. Two examples with a prototype server program are demonstrated, the first is data transfer from the server to a user, and the second is to a computer program. (author)

  12. The Brazilian participation in the nuclear power plant construction

    International Nuclear Information System (INIS)

    Fabricio, R.A.C.

    1981-01-01

    A brief review about the origin of the brazilian nuclear power program and the strategy adopted for its implementation in Brazil is presented. The creation of the Nuclebras Engineering S/A, the Germany technology transfer and the personell job-training in Brasil are discussed. Some management models used for nuclear power plant construction in the world are still presented. (E.G.) [pt

  13. Supply chain of steel industries for the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sahala M Lumbanraja

    2017-01-01

    Nuclear Power Plant (NPP) Construction needs steel materials for the manufacturing of heavy components and civil work construction. National industries is expected to supply steel components especially for non nuclear component needs. Supply chain of steel industries is required to know the potency of steel industries from upstream to downstream industries which can support the NPP construction sustainability. The type of steel needed in the NPP construction consist of structure steel, rebar, steel plate, etc. The aim of the study is to identify supply chain of steel industries from upstream industries to downstream industries so that they can supply steel needs in the NPP construction. The methodology used are literature review and industries survey by purposive sampling test which sent questionnaires and carrying out technical visits to the potential industries to supply steel components for NPP construction. From the analysis of the questionnaires and survey, it has been obtained that the Indonesian steel industries capable of supplying steel for construction materials of non-nuclear parts are PT. Krakatau Steel, PT. Gunung Steel Group (PT Gunung Garuda and PT. Gunung Raja Paksi), PT. Cilegon Fabricators and PT. Ometraco Arya Samanta. While steel materials for primary components with nuclear grade, such as steel materials for reactor vessels and pressure vessels, the Indonesian steel industry has not been able to supply them. Therefore, the Indonesian steel industries must improve its capability, both in raw material processing and fabrication capability in order to meet the requirements of specifications, codes and standards of nuclear grade. (author)

  14. The research on the material management system in nuclear power plant construction process

    International Nuclear Information System (INIS)

    Liu Xuegeng; Huang Zhongping

    2010-01-01

    According to the module construction speciality of nuclear power plant, this article analyzes the relationship between the actual amount of the material transported to the construction site and the planed needs of the material, and points out the zero inventory management target in the nuclear power plant construction site. Based on this, the article put forward a nuclear power plant material management system which is based on the 'pull' information driver. This system is composed by material coding sub-system, procurement and site material integrated management sub-system and project control sub-system, and is driven by the material demand from construction site to realize the JIT purchasing. This structure of the system can reduce the gap between the actual amount of the material transported to the site and the planed needs of the material and achieve the target of reducing storage at construction site. (authors)

  15. Nuclear Power Plants. Construction status report, data as of February 28, 1978

    International Nuclear Information System (INIS)

    1978-03-01

    Data on the construction status of nuclear power plants in the US as of February 28, 1978 are presented. The data include licensing activities affecting the construction as well as detailed information on construction activities and schedules

  16. Inspection of nuclear power plants under construction in Spain

    International Nuclear Information System (INIS)

    Santoma, L.

    1977-01-01

    Brief summary of the situation of the nuclear industry in Spain, in order to better understand the questions involved in the inspection of the Spanish nuclear power plants, as well as the experience acquired, followed by a description of some of the problems which have arisen during the construction phase. Also the problems faced by the Inspection of the Junta de Energia Nuclear are described in order to fulfill the missions entrusted to it. Finally, some recommendations are made in light of the experience had by Spain.(author) [es

  17. Nuclear power plants. Construction status report, data as of April 30, 1978

    International Nuclear Information System (INIS)

    1978-05-01

    Data on the construction status of nuclear power plants in the U.S. as of April 30, 1978 are presented. The data include licensing activities affecting the construction as well as detailed information on construction activities and schedules

  18. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  19. Technology transfer by industry for the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Frewer, H.; Altvater, W.

    1977-01-01

    The construction of nuclear power plants call for a wide sphere of industrial activities, nuclear as well as conventional. For a specific country the ways and methods of developing an industrial nuclear power program and reaching the target of independence, will widely differ, depending on the size of the country, the economic situation, the already existing industrial manufacturing and engineering capacities, the time schedule of the program and the type of contracting. The experience in effective technology transfer for the strengthening and setting up the national industry, and the engineering capacities, needed for the construction of nuclear power plants up to the largest size existing today are considered. The German nuclear power industry gained this experience in connection with the turn-key supply of the first units in various countries. The prerequisites and national nuclear power programs were different. Based on a successful technological development, including standardization, the German nuclear power industry could meet the demand and different approaches in these countries. The main features and practices followed for the transfer of technology is described for three different cases, namely Argentina, Brazil and Iran. (author)

  20. Abstract of articles presented at the seminar of investigating the construction of nuclear power plant in Iran

    International Nuclear Information System (INIS)

    Hariri, A.; Khonsari Moosavi, R.; Shoai-Naini, J.; Motamedi, M.A.

    1982-01-01

    Under five subtitles papers had been presented to the seminar of investigating the construction of nuclear power plant held at Isfahan by Atomic Energy Organization of Iran (AEOI). 1.The necessity of constructing nuclear power plants in Iran with relation to the development of nuclear technology. 2.Seven articles survey the problem of fuel cycling and the potentiallity of AEOI in this field. 3. Four papers allocate to the technology of nuclear safety and radiation protection. 4.Three papers evaluate technical and scientific capabitities of AEOI for constructing nuclear power plants, and two paper about planning and training man power with an aim toward construction of nuclear power plants

  1. Will nuclear power plant standardization reduce the licensing impact on construction

    International Nuclear Information System (INIS)

    Allen, J.M.; Bingham, W.G.; Keith, D.G.

    1976-01-01

    The NRC and the nuclear industry have been pursuing standardization quite vigorously in an effort to reduce the cost and schedule for the design and construction of nuclear power plants. The NRC is currently reviewing standard plant applications submitted under each of four standardization options. In addition, the NRC has published Standard Review Plans and Standard Technical Specifications. Although problems exist in the implementation of standardization and in areas unaffected by standardization, each of these standardization methods has the potential to reduce the licensing impact on construction

  2. Port construction works in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Narahara, Akio; Minamata, Hisashi; Harada, Kensaku

    1982-01-01

    Sendai Nuclear Power Station is the second nuclear power station of Kyushu Electric Power Co., Inc., with two PWR plants of 890 MW each, and the operation of No.1 plant will be started in July, 1984, and that of No.2 plant in March, 1986. The civil engineering works for both plants were started in June, 1978, and March, 1981, respectively, and the rate of progress as of the end of September, 1982, was 97 % and 66 %, respectively. In the construction of this power station, the port facility was provided for the transport of construction materials and spent fuel, and for the intake of condenser cooling water. In order to make the construction by dry work, the double cofferdam structures with steel sheet piles were made offshore. The use of the wharf was started in March, 1980, though typhoons hit the area several times, and the dredging in the port was completed in May, 1982. The outline of the plan of this power station, the state of affairs before the start of construction, the outline of the port construction works, the topography, geological features and sea conditions, the design of the port such as breakwaters, unloading wharf and water intake, the manufacture and installation of caissons, dredging, and the temporary cofferdam works for water intake are described. (author)

  3. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  4. Lessons Learned from Design and Construction of New US Nuclear Facility

    International Nuclear Information System (INIS)

    Seamans, S. E.; Horvath, D. A.

    2012-01-01

    For reasons related to licensing uncertainty, economic slowdown, and questionable financial backing, no new nuclear facility projects have been undertaken in the United States since the Three Mile Island Incident in 1979; however, a need for such facilities (both nuclear power plants and nuclear fuel facilities) continues and various incentives leading to the start of a nuclear renaissance have occurred. One incentive is a complete overhaul by the US Nuclear Regulatory Commission of the earlier two step licensing process under 10 CFR 50. The earlier approach required first a construction permit and then an operating license, whereas the new approach allows a more streamlined (one step) combined license (COL) approach utilizing Standard Design Certifications via the regulatory framework created by 10 CFR 52. Other incentives include US Government backed loan guarantees as well as private company contributions. One aspect to the new process has been consideration and implementation of many new topic-specific regulations and industry standards which have continued to evolve during the past 30 years in spite of the lack of new plant design and construction activity. Therefore, an Owner attempting a new nuclear facility project under 10 CFR 52 needs to address a myriad of new requirements previously unconsidered. Several new projects including both power plants and fuel facilities have begun the new licensing process with its many new requirements to consider, but a uranium enrichment facility has run the gamut first. This paper will summarize many of the lessons learned from designing, constructing and testing this first new nuclear facility to be built in the US in over 30 years.(author).

  5. 4D Simulation for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Jeong, Seo G.; Suh, Kune Y.

    2006-01-01

    For the timely and competitive response to rapidly changing energy environment at the turn of millennium, there is a desperate need to build the nuclear power plant (NPP) in the virtual reality of digital engineering prior to commissioning. To construct a NPP is a highly integrated, voluminous project. Verification of design and initial planning is prerequisite to construction to confirm optimal fabrication and high productivity. This paper presents the design feasibility by simulating the initial construction plan of NPP using four-dimensional (4D) simulation. The virtual reality method, using three dimensional (3D) computer-aided design (CAD) model, enables various designs in the project launching stage to be promptly and exactly previewed

  6. Outline of construction and facility features of Onagawa nuclear power station Unit No. 2

    International Nuclear Information System (INIS)

    Umimura, Yoshiharu; Tsunoda, Ryohei; Watanabe, Kazunori

    1996-01-01

    Tohoku Electric Power Company promotes development of various power sources to provide a stable supply of electricity in the future, and nuclear power takes a leading part. In August 1989, construction of Onagawa nuclear power plant Unit No. 2 (825MW) was started, following Unit No. 1 (524MW) which went on line in 1984 as Tohoku Electric's first nuclear power plant unit. Unit No. 2 began commercial operation in July 1995 through satisfactory construction work such as RPV hydraulic test in March 1994, fuel loading in October 1994, and various startup tests in each power stage. The design and construction of Unit No. 2 reflect construction and operation experience gained from Unit No. 1, and the latest technology, including that of the LWR Improvement and Standardization Program, was adopted to enhance facility reliability, improve operation and maintenance performance, and reduce worker dosage. Features of the facility, construction techniques, and a description of preoperation of Onagawa nuclear power plant Unit No. 2 are described in this paper. (author)

  7. A Study of the potency of construction service industries to support the first nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana

    2008-01-01

    The study was conducted to identify the potency of construction service industries to participate in nuclear power plant program in Indonesia. The potency is identified by evaluation results of national industries potency in some multinational construction service industries. The research methodology chosen was the survey method by sending questionnaires, visits to National industries, interview, and literature study. The data collection technique was sampling purposive. Data can be obtained from both primary and secondary data. The study results showed that the performance of construction service industries to support the NPP program must be increased through the selection of competent human resources, reliable equipment and an effective and efficient project management system, so that they can be expected to play necessary role in the nuclear power plant construction in Indonesia. (author)

  8. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Pingish, Panupong [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  9. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Pingish, Panupong; Choi, Kwang Sik

    2010-01-01

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  10. Stainless steel pool constructing technology and management of Fangjiashan Nuclear Power Company

    International Nuclear Information System (INIS)

    Wei Lianfeng; Wang Qun

    2013-01-01

    The construction of Fangjiashan nuclear power plant stainless steel cladding has been taken much attention. Based on the careful analysis of stainless steel cladding welding and construction main issues; Many measures have been taken such as welding technology, construction process, the stress control of welding deformation, the cleanliness control of construction process, install precision control, improvements of Non-destructive testing, product protection, etc. And installation methods and techniques have been improved and innovative, the installation quality of stainless steel cladding has been enhanced. At the same time, as owners of the plants, we explored the methods of quality supervision and control, together with the relevant units; and sense of quality management has been unified effectively, made stainless steel cladding quality getting better and better. Fangjiashan nuclear power stainless steel cladding construction quality and management experience has been highly recognized by every company. (authors)

  11. Construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Jicha, J.

    1989-01-01

    The Temelin nuclear power plant with four WWER-1000 reactors is designed to supply electricity in an amount of 23 TWh/yr and heat in an amount of 8000 TJ/yr in the first stage. The maximum heat extraction should be 922 MW. The plant construction includes the building of 10 buildings, the total cost being 52 thousand million Czechoslovak crowns. Another 41 investment items are associated with the plant construction. The most important of them include constructions for leading out the electric power, for standby electricity supply for the power plant, and for the extraction of heat from the plant and its supply to the town of Ceske Budejovice. The first unit should be started up for test performance in November 1992, the second in 1994 and the whole power plant should be complete by 1998. The state of the construction by February 1989 is described in detail. Attention is also paid to the preparatory activity for the operation and to social welfare of the personnel. (Z.M.)

  12. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  13. Proactive information provision for reducing social construct risk of nuclear facility

    International Nuclear Information System (INIS)

    Kitamura, Masaharu; Takahashi, Makoto; Hashizume, Hidetoshi; Shiraishi, Natsuki; Yagi, Ekou

    2006-01-01

    Outlines of, and the empirical observations from, an action research project aiming at improvement of relationship between nuclear community and the public have been reported in this paper. Ultimate goal of the project is effective reduction of social construct risk of nuclear power plants. As an initial approach to the goal, a proactive information provision scheme has been designed based on the knowledge acquired during our previous attempt of public communication named repetitive dialogue forum. The information contents consistent with the actual need of local citizens has been derived from the previous experiences and provided in the present project. Although the project is in its incipient stage, the observations are informative enough to develop the project further to attain the ultimate purpose of reducing the social construct component of technological risk of nuclear facilities. (author)

  14. Rationalizing of construction engineering of nuclear power plants with pressurized water reactors

    International Nuclear Information System (INIS)

    Schmidt, S.

    1977-01-01

    Construction of large power plants requires further reduction of construction efforts and the construction period. A new constructional and technological solution has been developed with the steel-cell composite structure applied in the Greifswald nuclear power plant 'Bruno Leuschner' for the first time. Principles of design, fabrication, transport, and mounting are described. The benefits of the method are indicated. (author)

  15. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  16. Concerning the structure of occupational accidents involving construction workers in the erection of nuclear power plants

    International Nuclear Information System (INIS)

    Nowak, B.; Roebenack, K.D.

    1991-01-01

    An investigation of 561 occupational accidents involving construction workers which took place during the construction of nuclear power plants failed to show any significant deviation in comparison with general construction as regards process classification, classification of accidents according to occupation and situation, and accidents severity. Occupational accidents which are typial for nuclear power plant construction are a rare exception. (orig.) [de

  17. Innovation in civil construction system of nuclear power plant

    International Nuclear Information System (INIS)

    Takami, Masahiro

    1996-01-01

    Nowadays, the computer-aided production systems have been already introduced to almost all kinds of industries. The construction industry, which has been said to be conservative for the modernization of production system, now expects the CIC (Computer Integrated Construction) as the means to innovate the construction production process. Shimizu Corporation has developed the new computer-aided production system, 'SIPS: Shimizu Integrated Production System', and has used it in the actual construction projects. In the system, the computer supports every phase of construction projects like market researching, design, material purchase, construction work, and maintenance. The project of Kashiwazaki-kariwa Nuclear Power Station Unit No.7 is one of the model cases. Here we applied following three concepts, (1) the full use and integration of 3D-CAD data-base through all phases of construction, (2) the setting-up of the information network system among the site office, the head office, and the mechanical and electrical manufacturer, (3) the introduction of advanced construction technologies such as large block prefabrication method. (author)

  18. The technical feasibility of uranium enrichment for nuclear bomb construction at the parallel nuclear program plant

    International Nuclear Information System (INIS)

    Rosa, L.P.

    1990-01-01

    It is discussed the hole of the Parallel Nuclear Program is Brazil and the feasibility of uranium enrichment for nuclear bomb construction. This program involves two research centers, one belonging to the brazilian navy and another to the aeronautics. Some other brazilian institutes like CTA, IPEN, COPESP and CETEX and also taking part in the program. (A.C.A.S.)

  19. Experiences for construction and preoperation test of Shimane nuclear power station

    International Nuclear Information System (INIS)

    Niki, Yoshiya; Taniguchi, Takashi.

    1975-01-01

    Shimane nuclear power station of Chugoku Electric Power Company has begun its commercial operation on March 29, 1974 after the construction period of 49.5 months. The fundamental construction process which Chugoku Electric Power Company and Hitachi Ltd. had agreed was 45 month process, which was the readjustment of the construction process which General Electric Company had presented for preceding nuclear power plants in Japan and its results. The achieved construction and test process required 49.5 months with 4.5 months delay. This delay occurred in two points. The one was caused by the ''upside down'' problem of control rods which had been imported from G.E. The another was caused by the restriction of the rate of load increasing. Fuel charging which indicates the substantial finish of construction works, had begun at May 1, 1973 on schedule. Therefore it can be said that the construction works had been carried out just according to the fundamental process. However, analyzing the result of progress, the pressure test of a reactor containment vessel and the set-up and the first pressure test of a reactor pressure vessel led the schedule by about 2 months. On the contrary, the subsequent works delayed by just that leading time. (Tai, I.)

  20. Improvement of design and construction technology in Japanese nuclear power plants

    International Nuclear Information System (INIS)

    Yomei Kato; Kiyoshi Shmizu

    1987-01-01

    Nuclear power generation currently offers economic merits superior to those of other methods dependant on such thermal power ganeration as petroleum, LNG, or coal. However, it is essential for the nuclear power generation continuously to retain economic superiority through concurently maintaining its high safety features and outstanding reliability. For achieving this purpose, taking into account of importance explained above, we have been developing and improving those of technologies such as design, engineering, and construction regarding the both field of management and techniques useful for plant construction. This paper covers the several instructive matters which Hitachi has accomplished throughout having had his hand in the project jobs. (author)

  1. Quality assurance during site construction of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations related to the establishment and implementation of a quality assurance programme for the site construction activities at nuclear power plants. These include activities such as fabricating, erecting, installing, handling, storing, cleaning, flushing, inspecting, testing, modifying, repairing, and maintaining

  2. Construction permit of nuclear power plants in case of leasing

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Guiding lines (unofficial): 1. A leasing company can be founded to finance and to operate a nuclear power plant. 2. The leasing company does not require a license according to section 7 of the Atomic Energy Act, for it neither constructs nor posesses the nuclear power plant. 3. This also applies if the proprietor, and later on operator, of the nuclear power plant holds an interest in this leasing company as a shareholder. Section 7, and 19 subsection 3 of the Atomic Energy Act. Higher Administrative Court of Rhineland Palatinate, Decision of July 20sup(th), 1982. (orig.) [de

  3. Stages in planning and construction of the Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Pracht, F.

    1975-01-01

    On October 23, 1972, RWE gave a letter of intent and on January 9, 1973 an order for the construction of a nuclear power plant on a turn-key basis to the consortium of BBC, BBR and Hochtief. The power plant in question was the Muelheim-Kaerlich nuclear power station with a pressurized-water reactor of a gross efficiency of 1,295 MWe. After considerable delay of the project, the first building permit was issued to the builder-owner on January 15, 1975, and the constructional work on the building site started immediately afterwards. As the planning and constructional work has so far been carried out according to schedule and the consortium intends to keep the effects of the belated license as small as possible, the start-off of the plant will probably be in summer 1979 if the constructional work is not interrupted. (orig./AK) [de

  4. A regulatory perspective of the role of construction in revitalizing the United States nuclear industry

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1983-01-01

    Technical and managerial experience in nuclear power plant construction is presented from the perspective of the United States Nuclear Regulatory Commission (NRC). In the context of actions that would contribute to revitalizing the nuclear industry in the United States of America, greater effectiveness of utility management during construction is proposed. The reasons why management effectiveness is so important are developed beginning with summaries of defects that were built into several US plants under construction. The root causes of these significant defects were management failures. In terms of benefits, effective management is important because of its effects on nuclear safety, project construction costs, and future reliability of the plant after commissioning. Actions that would enhance good management include emphasizing the inseparable nature of production and quality, that quality cannot be inspected into a plant, and that a strong construction management staff and exchanges of experience and information are essential. Techniques that have been used successfully in construction management are discussed. NRC and industry initiatives are in progress to improve management responsibility and learning from experience. Projects include Owner's Certification, assessments of licensee performance, fostering good practices across the industry, and improving the NRC inspection programme. Revitalization will not be easy, but it is achievable. (author)

  5. Nuclear Power Plant Construction Contracts: A Review of the Major Problems

    International Nuclear Information System (INIS)

    Crawford, B.B.

    1977-01-01

    This paper analyses the problems raised by nuclear power plant construction contracts. To the extent these contracts can be defined as devices for allocating responsibilities and risks between the Contracting Parties, the author notes that the 'responsibilities' aspect presents no problem peculiar to the nuclear sector and that difficulties mainly stem from co-ordination of work. On the other hand, the list of problems linked to 'nuclear contract risks' is long: uncertainties in the licensing procedure and export licenses, changes in pricing due to inflation, imprevision and force majeure theories, protection of proprietary information, operator's civil liability for nuclear incidents. (NEA) [fr

  6. Construction of a bibliographic information database and a web directory for the nuclear science and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jeong Hoon; Kim, Tae Whan; Lee, Ji Ho; Chun, Young Chun; Yu, An Na

    2005-11-15

    The objective of this project is to construct the bibliographic information database and the web directory in the nuclear field. Its construction is very timely and important. Because nuclear science and technology has an considerable effect all over the other sciences and technologies due to its property of giant and complex engineering. We aimed to firmly build up a basis of efficient management of the bibliographic information database and the web directory in the nuclear field. The results of this project that we achieved in this year are as follows : first, construction of the bibliographic information database in the nuclear field(the target title: 1,500 titles ; research report: 1,000 titles, full-text report: 250 titles, full-text article: 250 titles). Second, completion of construction of the web directory in the nuclear field by using SWING (the total figure achieved : 2,613 titles). We plan that we will positively give more information to the general public interested in the nuclear field and to the experts of the field through this bibliographic information database on KAERI's home page, KAERI's electronic library and other related sites as well as participation at various seminars and meetings related to the nuclear field.

  7. Computer aided construction engineering system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Nakajima, Akira; Miyahara, Ryohei; Miura, Jun

    1990-01-01

    The construction CAE system for nuclear power plants is the tool for the construction work simulator (procedure, processes and management simulation) connected to 3D-CAD (three-dimensional plant layout planning CAD). The data used for construction work simulation are registered in the data base as the installation smallest unit data from the 3D-CAD. This construction work simulator comprises the automatic installation procedure decision system, with which a construction planner decides installation procedure by using a high performance graphic work station, and based on a 3D-CAD model, utilizing empirical procedure logic, the dialogue system for making the installation procedure more optimal by utilizing effectively the graphic function, the evaluation system for synthetically evaluating workability, personnel plan and so on by adding the simulation of human behavior based on these procedures, the schedule system which carries out work process simulation based on the above, the data base system for letting to do these plans effectively and the project management system. By means of these, the plant construction of high quality is expected. (K.I.)

  8. Economical and industrial impact of nuclear power stations construction in Belgium

    International Nuclear Information System (INIS)

    Labrique, J.; Klees, P.

    1981-01-01

    After a brief introduction the paper analyses the employment in the Belgian nuclear sector with regard to construction, the operation, the engineering of nuclear power plants as well as fuel reprocessing. In the economical section a comparison of the kWh cost of different sources is presented as well as the seasibility of this cost to the raw material price. The future installation of nuclear power plants is discussed and the impact of its delay on the Belgian economy by an absence of decision is analyzed. (AF)

  9. The management of design interfaces in the nuclear power construction

    International Nuclear Information System (INIS)

    Lv Shubao

    2005-01-01

    This paper introduces the design interfaces management in the construction of nuclear power plant through the Interface Control Manual (ICM). The ICM management model had been applied and practiced in the construction of both DAYA BAY and LING AO phase I (LNPS I ) nuclear power stations. It has solved many troublesome matters in the design interfaces information exchange among all concerned parties, and contributed to these projects greatly. The author considers that the ICM management: has great value for extending and applying in the new construction of nuclear power station. In order to understand easily the ICM management model, the paper expatiates on the compiling principle, the procedure establishing, the interface editing and the ICM updating. The advantages of using ICM are as follow: First, the ICM model provides the authoritative and legal document to be obeyed by all contractors for exchanging the design technical information basing on the responsibility and planning. Second, the ICM enhances the schedule control for the project engineering. Third, using ICM to manage the design information exchange solves the questions assorted with different parties, and decreases the times spent in unproductive coordination meeting. Fourth, the ICM management uses computer database and provides convenient method for engineers to track and control interface exchange, gets twice the result with half the effort. Fifth, the ICM database allows easy retrieval of any technical information for further re-use in a similar project. (authors)

  10. Long-term prospects of capital demands of nuclear power sources construction in Czechoslovakia

    International Nuclear Information System (INIS)

    Sladek, V.; Kysel, J.

    1988-01-01

    The capital demands are compared for four variants of nuclear power plant construction projects to be implemented in Czechoslovakia by the year 2030. By the year 2000, all variants are expected to achieve the total installed capacity of 11,280 MW. Construction in the following period then differs: by the year 2030 total installed nuclear capacity is to reach the following values: 1st variant - 30,000 MW; 2nd variant - 35,000 MW, 3rd variant - 36,500 MW and 4th variant - 27,760 MW. WWER-1000, WWER-1500 and WWER-500 reactors are expected to be installed in the variant projects which differ in speed of construction and life of the units. They are designed such as to provide for the smooth transfer of building workers from one site to the next. The comparison of capital demands shows that a suitable siting strategy and site preparation can save costs and preclude serious sociological problems. The possible extension of the life of nuclear power plants will provide for a better use of primary investments and improve the economic efficiency of nuclear power plants. (Z.M.). 2 figs., 4 tabs., 6 refs

  11. Effect of construction time, interest rate, and inflation on the capital cost of nuclear power plants

    International Nuclear Information System (INIS)

    Abel, P.S.; Greybeck, E.M.; Omberg, R.P.

    1981-09-01

    Cost estimates for nuclear power plants currently under construction are on the order of four billion dollars. It will be shown, in this paper, that this is a direct consequence of relatively high inflation rates and relatively long construction times. If either inflation rates or construction times, or a combination thereof, should decrease significantly, cost estimates for nuclear power plants could return to approximately two billion dollars

  12. Model of a Nuclear Security Naval Agency for radiation control of the Industrial Complex of of Submarine Construction and Maintenance Ship with Nuclear Propulsion

    International Nuclear Information System (INIS)

    Lins Junior, Amilton de Sousa

    2017-01-01

    Due to the construction, by Brazilian Navy, of a Submarine Construction and Maintenance Ship with Nuclear Propulsion, where, among other activities, the commissioning and exchange of the fuel elements of the reactor in the future Nuclear Submarine, and of a Naval Base where the Nuclear Submarine and the Conventional Submarines, it is necessary the establishment of a Nuclear Security Naval Agency to monitor activities involving ionizing radiation sources and nuclear materials aimed at the radiological protection of exposed occupationally individuals (IOE), the general public and the environment. It should be noted that nuclear and radioactive material will be present only in a part of the yard called Radiological Complex. Therefore, the development of a structure for the control of the Radiological Complex is fundamental, considering that the future licensing process will be unprecedented in Brazil and will face several difficulties. This work presents a model of a structure for the radiological control of the industrial complex for the construction and maintenance of the submarine with nuclear propulsion, as well as the fundamental concepts of the activities, such as inspection, regulations and authorizations, to be carried out by the various component sectors of the Nuclear Security Naval Agency. (author)

  13. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  14. Analysis of floor technology scheme in open-top construction of nuclear power project

    International Nuclear Information System (INIS)

    Zhang Shuxia; Lu Qinwu; Han Xiaoping

    2014-01-01

    Open-top construction is general technology in Ⅲ generation in nuclear power project. Because traditional floor structure and its form board upholding doesn't meet open-top construction, four floor scheme are presented, whose characters, advantages and disadvantages, and its application are summarized. The research results will help to the application of open-top construction. (authors)

  15. A comparative study of Japan and United States nuclear enterprise: Industry structure and construction experience

    International Nuclear Information System (INIS)

    Hinman, G.W.; Lowinger, T.C.

    1987-01-01

    Both Japan and the United States have undertaken major programs to utilize nuclear power for central station electricity generation. Over the past 20 years, the Japanese have developed their own construction and government regulatory institutions and now have an essentially independent domestic nuclear power program. Nuclear construction and government oversight of nuclear power have developed somewhat differently in Japan and the United States, reflecting to some extent the two countries' different business and social cultures. In the United States the vendor and utility industries are much more fragmented than those in Japan, and construction projects are carried out on a more competitive basis. The Japanese industry operates through a few well-established consortia while the U.S. industry does not. Relations among the national government, the vendors, and the electric utilities tend to be cooperative in Japan while they are more adversarial in the Untied States. This paper discusses these topics in a framework of a comparative study of the countries' nuclear industries. Whether because of the factors mentioned above or for other reasons the success of nuclear power in Japan and the United States has differed dramatically in recent years. This paper compares the performance of the nuclear enterprise in these two countries in terms of the physical attributes of the plants themselves, the labor required to build them, and the construction times required. It also discusses the relationship between initial estimates of costs and schedules and actual results achieved. On all counts, recent Japanese performance has been better than in the United States

  16. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  17. Major factors influencing craft productivity in nuclear power plant construction

    International Nuclear Information System (INIS)

    Borcherding, J.D.; Sebastian, S.J.

    1980-01-01

    This paper reports on a research study whose objective was to determine the most influential factors adversely affecting craft productivity in nuclear power plant construction from the perspective of the tradesmen employed at the sites. Data were collected through the use of a questionnaire survey and group interview sessions, predominantly with workmen, at six nuclear power plant construction projects. Craftsmen were chosen as the major data base because of their awareness of how their time would actually be spent on the project. Topics considered include the factors influencing craft productivity, material availability, redoing work, crew interfacing, overcrowded work areas, instruction time, inspection delays, craft turnover, craft absenteeism, foreman changes, foreman incompetence, engineering design lead time, comprehensive scheduling of the design function, the responsibility of the utility, value engineering, plant standardization, the effective utilization of the planning and scheduling system, and the labor-management committee

  18. Quality assurance and quality control of nuclear engineering during construction phase

    International Nuclear Information System (INIS)

    Zhang Zhihua; Deng Yue; Liu Yaoguang; Xu Xianqi; Zhou Shan; Qian Dazhi; Zhang Yang

    2007-01-01

    The quality assurance (QA) and quality control (QC) is a very important work in the nuclear engineering. This paper starts with how to establish quality assurance system of nuclear engineering construction phase, then introduces several experiments and techniques such as the implementation of quality assurance program, the quality assurance and quality control of contractors, the quality surveillance and control of supervisory companies, quality assurance audit and surveillance of builders. (authors)

  19. Modular construction of nuclear power plants in Korea and technical issues - 15051

    International Nuclear Information System (INIS)

    Kim, T.I.; Kim, K.K.; Yoon, J.J.; Han, G.E.

    2015-01-01

    The construction of nuclear power plants (NPPs) is the process of installing structures, systems and components (SCCs) of NPPs within a targeted time and a budget while ensuring quality and safety. Recently various efforts have been made in the nuclear industry to construct NPPs more effectively and modular construction has been highlighted as one of the most effective methods. Modular construction has been known to be effective in reducing construction time, allocating labor and equipment more efficiently while ensuring quality. The installation of structures and systems requires stable provision of labor force which is essential to keep the installation work of bulk materials such as re-bars, pipes and so forth in a construction site over a long period. Especially, in the case of the structure work, it is greatly affected by weather conditions such as rainfall, snow and wind, and discontinuity of installation work due to weather is directly related with success of a construction project. The most significant feature of modular construction is that SSCs could be pre-fabricated at an off-site factory or an assembly shop near a construction site, which provides stable labor force and favorable work condition impervious to weather. Reinforced concrete is largely used in NPPs and re-bar and form works are time consuming requiring lots of labor force at a construction site. Various efforts have been made to install re-bars and forms at the same time, which led to the development of SC structures. SC structures are composed of face steel plates which work as forms for concrete pouring as well as reinforcement for concrete. In this paper, we are going to introduce module types applicable to construction of NPPs and the status of modular construction in Korea. In addition, several issues will be addressed for the successful application of modular construction

  20. Mitsubishi nuclear technologies and construction of new Bohunice

    International Nuclear Information System (INIS)

    Yoshizu, T.

    2009-01-01

    Mitsubishi Heavy Industries (MHI) has setup Generation III+ category power plant technologies both in large and middle size reactors as a key player in the global market of nuclear plant suppliers. MHI has developed 1,700 MWe class Advanced Pressurized Water Reactor for European utilities, EU-APWR, utilizing the APWR technology in Japan. The plant configuration is based on the proven technologies from MHI's ample experiences, but various advanced technologies are adopted to achieve enhanced safety, reliability, and economy. For the regions without large grid capacity, middle-sized nuclear power plant will be an attractive option for the utilities. Joint Venture ATMEA with AREVA NP will serve ATMEA1. The ATMEA1 will offer 1,100 MWe output with superior operation performance based on reliable and proven technologies. Mitsubishi has experience of half century for all of 26 PWR plants in Japan. The latest plant is Tomari Unit 3 of 1,000 MWe, which has completed the construction work and now in the final commissioning test. Tomari Unit 3 applies some advanced technologies such as all digital I and C, which are to be implemented in the EU-APWR. Based on this construction experience, Mitsubishi can contribute any kind of demands for New Bohunice 5 th unit project with the total engineering capability. (author)

  1. The American nuclear construction craftsmen: Will we be ready to build again?

    International Nuclear Information System (INIS)

    Bravo, R.

    1990-01-01

    The present state of nuclear plant maintenance and operations support reflects sexual, ethnic, and radical integration; continued educational advances; some computer literacy; mixed trades in maintenance; detailed training for maintenance and operations work in the operating plant; plant safety awareness and respect; need for top-quality, take the time to do it right mentality; and planning. With no new nuclear construction, what will be the specific talents, focus, and contributions that the craftsmen can be expected to bring to the project? To be prepared to successfully manage the next generation of nuclear plant construction, the industry must be acutely aware of the needs of the labor pool. To be aware of the needs requires an intimate knowledge of the present state of the craft talent, the changed expectations of their contributions, and the effects of new technologies, materials, methods, and individuals that will be used to design and build

  2. Construction quality assurance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-10-01

    This Standard contains the requirements for the quality assurance program applicable to the construction phase of a nuclear power plant. This Standard covers all activities carried out for and by the owner from the receipt of components or materials on the site to their incorporation in systems or structures as required by drawings or other formal engineering information. It also covers the provision of required support activities and equipment and applies at all stages on the site as far as the testing of components or systems before they are submitted for commissioning. 2 figs.

  3. Construction quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1983-10-01

    This Standard contains the requirements for the quality assurance program applicable to the construction phase of a nuclear power plant. This Standard covers all activities carried out for and by the owner from the receipt of components or materials on the site to their incorporation in systems or structures as required by drawings or other formal engineering information. It also covers the provision of required support activities and equipment and applies at all stages on the site as far as the testing of components or systems before they are submitted for commissioning. 2 figs

  4. Assessment of modular construction for safety-related structures at advanced nuclear power plants

    International Nuclear Information System (INIS)

    Braverman, J.; Morante, R.; Hofmayer, C.

    1997-03-01

    Modular construction techniques have been successfully used in a number of industries, both domestically and internationally. Recently, the use of structural modules has been proposed for advanced nuclear power plants. The objective in utilizing modular construction is to reduce the construction schedule, reduce construction costs, and improve the quality of construction. This report documents the results of a program which evaluated the proposed use of modular construction for safety-related structures in advanced nuclear power plant designs. The program included review of current modular construction technology, development of licensing review criteria for modular construction, and initial validation of currently available analytical techniques applied to concrete-filled steel structural modules. The program was conducted in three phases. The objective of the first phase was to identify the technical issues and the need for further study in order to support NRC licensing review activities. The two key findings were the need for supplementary review criteria to augment the Standard Review Plan and the need for verified design/analysis methodology for unique types of modules, such as the concrete-filled steel module. In the second phase of this program, Modular Construction Review Criteria were developed to provide guidance for licensing reviews. In the third phase, an analysis effort was conducted to determine if currently available finite element analysis techniques can be used to predict the response of concrete-filled steel modules

  5. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  6. Environmental assessment report: Nuclear Test Technology Complex. [Construction and operation of proposed facility

    Energy Technology Data Exchange (ETDEWEB)

    Tonnessen, K.; Tewes, H.A.

    1982-08-01

    The US Department of Energy (USDOE) is planning to construct and operate a structure, designated the Nuclear Test Technology Complex (NTTC), on a site located west of and adjacent to the Lawrence Livermore National Laboratory. The NTTC is designed to house 350 nuclear test program personnel, and will accommodate the needs of the entire staff of the continuing Nuclear Test Program (NTP). The project has three phases: land acquisition, facility construction and facility operation. The purpose of this environmental assessment report is to describe the activities associated with the three phases of the NTTC project and to evaluate potential environmental disruptions. The project site is located in a rural area of southeastern Alameda County, California, where the primary land use is agriculture; however, the County has zoned the area for industrial development. The environmental impacts of the project include surface disturbance, high noise levels, possible increases in site erosion, and decreased air quality. These impacts will occur primarily during the construction phase of the NTTC project and can be mitigated in part by measures proposed in this report.

  7. Delays in nuclear power plant construction. Progress report, September 15, 1976--September 14, 1977

    International Nuclear Information System (INIS)

    Mason, G.E.; Larew, R.E.

    1977-01-01

    This report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts that should minimize or eliminate the identified barriers. The identified barriers include: (1) design and construction interfacing problems; (2) problems relating to the selection and use of permanent materials and construction methods; (3) construction coordination and communication problems; and (4) problems associated with manpower availability and productivity;

  8. Augmented reality for improved communication of construction and maintenance plans in nuclear power plants

    International Nuclear Information System (INIS)

    Sorensen, Soren S.

    2010-01-01

    The purpose of implementing Augmented Reality, AR, in the planning, construction and maintenance of Nuclear Power Plants is to secure strict control, precise and correct constructions, exact execution of assignments and heightened safety at all levels. Communication of construction plans to ensure precise and correct assembly of structural elements is essential in all building projects. This is especially crucial in the construction of nuclear plants and installation of new components. The current ways in which construction plans are communicated, blueprints, 3D digital models and written descriptions all embody the need for significant levels of abstraction and interpretation, and are thus both difficult to understand and can lead to misinterpretations. A simulation system with full scale three dimensional models experienced in the physical setting where operations are to take place would bring operators closer to the real life assignments. Augmented Reality is a visualization technology that provides this motivation. (author)

  9. State of the art and further development of reinforced concrete wall cells for nuclear power plant construction

    International Nuclear Information System (INIS)

    Uhlemann, E.; Wartenberg, J.

    1985-01-01

    Reinforced concrete wall cells have been developed for nuclear power plant construction by the USSR and GDR. In this article, a new type of these cells, which will be used for constructing auxiliary equipment of the Stendal nuclear power plant, is described

  10. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  11. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  12. Evaluation for rigidity of box construction of nuclear reactor building

    International Nuclear Information System (INIS)

    Yamakawa, Tetsuo

    1979-01-01

    A huge box-shaped structure (hereafter, called box construction) of reinforced concrete is presently utilized as the reactor building structure in nuclear power plants. Evaluation of the rigidity of the huge box construction is required for making a vibration analysis model of nuclear reactor buildings. It is necessary to handle the box construction as the plates to which the force in plane is applied. This paper describes that the bending theory in elementary beam theory is equivalent to a peculiar, orthogonally anisotropic plate, the shearing rigidity and film rigidity in y direction of which are put to infinity and the Poisson's ratio is put to zero, viewed from the two-dimensional theory of elasticity. The form factor of 1.2 for shearing deformation in rectangular cross section was calculated from the parabolic distribution of shearing stress intensity, and it is the maximum value. The factor is equal to 1.2 for slender beams, but smaller than 1.2 for short and thick beams, having tendency to converge to 1.0. The non-conformity of boundary conditions regarding the shearing force at the both ends of cantilevers does not affect very seriously the evaluation of shearing rigidity. From the above results, it was found that the application of the theory to the box construction was able to give the rigidity evaluation with sufficient engineering accuracy. The theory can also be applied to the evaluation of tube type ultrahigh buildings. (Wakatsuki, Y.)

  13. Method for the construction of a nuclear reactor with a prestressed concrete pressure vessel

    International Nuclear Information System (INIS)

    Schoening, J.; Schwiers, H.G.

    1981-01-01

    Method for the construction of nuclear reactors with prestressed concrete pressure vessel, providing during the initial stage of construction of the prestressed concrete pressure vessel a support structure around the liner. This enables an early mounting of core components in clean conditions as well as load reductions for final concreting in layers of the prestressed concrete pressure vessel. By applying the support structure, the overall assembly time of these nuclear power plant is considerably reduced without extra cost. (orig.) [de

  14. Impact of ACI-ASME code on design and construction of nuclear containment structures

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1978-01-01

    The effect of the ACI-ASME code for design and construction of concrete containment structures on the nuclear and concrete industries is examined. Topics covered include purpose of the code, general requirements, responsibilities and duties, design and construction specifications, quality assurance, inspection, the liner, and stamping

  15. The Finnish Experience with the Construction of Onkalo. Licensing of a repository for nuclear waste in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2014-01-01

    Pursuant to the Nuclear Energy Act (990/1987), a license holder whose operations result, or have resulted, in the generation of nuclear waste must perform all measures included in the management of nuclear waste and preparation thereof and bear all the costs of nuclear waste management. Under law, spent nuclear fuel is regarded as nuclear waste. According to the amendment made to the Nuclear Energy Act in 1994, nuclear waste generated in Finland must be handled, stored and permanently disposed of in Finland. Nuclear waste generated elsewhere may not be handled, stored and permanently disposed of in Finland. The Finnish nuclear legislation defines spent fuel as nuclear waste and requires that it has to be disposed of in the Finnish bedrock. Over 30 years of systematic R and D has been carried out to develop the repository concept, site selection, technologies, safety assessment and the regulatory approach. Activities are based on the Finnish Government's long term strategies since 1983. The stepwise development and future plans for disposal are presented in Table 1. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act (990/1987) and Decree (161/1988). These licensing steps are: - Decision in Principle (DiP); - Construction License; - Operational License. An Environmental Impact Assessment (EIA) shall be conducted prior to the first authorization step of a major nuclear waste facility. The EIA procedure for the final disposal of spent nuclear fuel from three units of the Olkiluoto nuclear power plant and two units of the Loviisa nuclear power plant was carried out in 1998-1999 and extended to one more unit at Olkiluoto in 2008- 2009. Pursuant to the Nuclear Energy Act, before making the DiP the Government shall ascertain whether the municipality planned as the location of the nuclear facility is in favour of the facility, and ensure that no facts indicating a

  16. Assessment of the impact of nuclear power plant construction and operation on small regions

    International Nuclear Information System (INIS)

    Johnson, M.H. Jr.

    1977-01-01

    This study addresses the problem of the comprehensive, quantitative evaluation of the environmental, economic, and social impacts of the construction and operation of nuclear power plant on a given region. A theoretical model of the regional impacts is constructed employing input-output methods that are extended to include ecologic as well as economic effects. Thus, the regional model explicitly incorporates environmental feedback as a consequence of economic activity. The model is then employed to estimate the impact of the construction and operation of a nuclear power facility on a small region in South Carolina. Measures of economic and environmental effects include estimates of changes in output, income, employment, local government revenue and expenditure, external costs of environmental decay, pollution loads, and common-property resource usage. Results indicate that, in the South Carolina case study, significant gains in social welfare accrued to the region due to the construction and operation of the nuclear power facility. Further, the theoretical method developed herein provides a comprehensive method of objectively assessing various types of impacts on a region as small as several contiguous counties or even a single county

  17. Progressive building methods in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sikura, V.

    1980-01-01

    A detailed description is given of the new prospective technologies used in the construction of the Bohunice V-1 nuclear power plant. They include the use of steel and large-area forms, the use of profile sheets as a substitute for forms, assembled raw partitions, wall shells consisting of clamped porous concrete slabs, assembled roof shells, special finish of concrete walls, bearing wall deep foundation, the use of modern building machinery for concreting, reinforcing and welding works. (M.S.)

  18. From Streams to Lumps: Transforming Long-Term Incentives into Up-Front Financing for New Nuclear Construction

    International Nuclear Information System (INIS)

    George, Glenn R.

    2006-01-01

    The Energy Policy Act of 2005 is an important development in the financing of new nuclear capacity in the near- to mid-term in the U.S.A. Key features of the Act, including production tax credits, loan guarantees, funding support, and 'standby support', are intended to provide significant incentives for new nuclear development, construction, and operation. There is a mismatch, however, between the nature and extent of incentives being offered and what is needed to spur nuclear plant deployment in light of power market uncertainty, utility investor wariness, and the need to raise significant capital before a nuclear construction project can be launched. In this paper, the author addresses these issues through the lens of financial tools and techniques. The paper considers various ways in which long-term streams of subsidies can be transformed into up-front financing for new nuclear capacity. Securing and related financial structures are among the mechanisms considered for potentially bridging the temporal gap between flows of financial benefits conferred legislatively and lumps of capital required by developers and investors in advance of a construction program. (authors)

  19. Risks and challenges associated with the design and construction of a nuclear power plant

    International Nuclear Information System (INIS)

    Liebana Martinez, B.; Armas Garcia, A.; Martinez Gozalo, I.

    2011-01-01

    The construction of a nuclear power plant project, considering the period prior to the operation of the plant, requires a very strict risk control to ensure compliance with a series of challenges. The present paper identifying the most important challenges facing the construct ability and license requirements of the process, identifying the interfaces and proposing a methodology of construction to meet the challenge of a construction process in 5 years.

  20. The Brazilian experience in the civil construction of nuclear power plants

    International Nuclear Information System (INIS)

    Gonzaga, L.A.

    1985-01-01

    The processes and phases of technology absorption, together with the resultant Experience-Factor Model for civil Works, considering philosophy of operation of the civil contractor, design aspects and some structural influences for constructing nuclear power plants are presented. (Author) [pt

  1. The Brazilian experience in the civil construction of nuclear power plants

    International Nuclear Information System (INIS)

    Gonzaga, L.A.

    1985-01-01

    The processes and phases of technology absorption, together with the resultant Experience Factor Model for Civil Works, considering philosophy of operation of the civil contractor, design aspects and some structural influences for constructing nuclear power plants are presented. (author) [pt

  2. A reply to “Historical construction costs of global nuclear power reactors”

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.; Grubler, Arnulf

    2017-01-01

    present data on the overnight costs of more than half of nuclear reactors built worldwide since the beginning of the nuclear age. The authors claim that this consolidated data set offers more accurate insights than previous country-level assessments. Unfortunately, the authors make analytical choices that mask nuclear power's real construction costs, cherry pick data, and include misleading data on early experimental and demonstration reactors. For those reasons, serious students of such issues should look elsewhere for guidance about understanding the true costs of nuclear power. - Highlights: • claim to accurately assess nuclear plant costs over time. • The authors err by relying on overnight costs, which exclude interest. • The authors cherry pick data (e.g, ignoring problems with French nuclear data). • The article's cherry picked data don’t even support the article's own conclusions. • Lovering et al. is not a reliable source for costs of nuclear power.

  3. Experience in constructing a spent nuclear fuel reprocessing plant in Japan

    International Nuclear Information System (INIS)

    Hashimoto, K.; Sakuma, A.; Inoue, K.

    1977-01-01

    Towards the end of 1970, Japan Gasoline Co. Ltd. (JGC) and Saint-Gobain Techniques Nouvelles of France received an order for the construction of a reprocessing plant from Power Reactor and Nuclear Fuel Development Corporation, as a joint prime contractor. The work executed by JGC in this project is reported and consisted of: (1) Procurement, inspection and schedule control of equipment and materials other than those imported from Europe; (2) Conclusion of contracts with various subcontractors relating to the building construction, piping and other work; and (3) Supervision of field work. The field work began in June 1971 and was completed in about 40 months. The overall field labour mobilized during that time totalled about 410,000 man-days, and 900,000 man-hours were spent by the JGC engineers. With the object of constructing a high-quality plant, JGC since 1969 has started to investigate subcontractors in Japan as well as undertaking the selection, education and training of prospective subcontractors. For the welding work in particular, techniques were imported from France and domestic techniques were developed at the same time. Completion of the blank tests was estimated to require 33 months, but the schedule was delayed about seven months for various reasons. Obviously there is room for many improvements when constructing future nuclear chemical plants. However, careful consideration should also be given from the basic design stage onward, to the methods and sequence of construction so that a simplified plan can be obtained from which the work could be easily executed without resorting to special technology. This would lead to reduction in construction time, and a safer and more reliable plant at lower cost. (author)

  4. Construction times and the decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Erramuspe, H.J.

    1988-01-01

    The construction and the decommissioning periods of nuclear power plants (NPP), are studied, due to their importance in the generation costs. With reference to the construction periods of these plants, a review is made of the situation and technical improvements made in different countries, with the purpose of shortening them. In regard to the decommissioning of NPP, the present and future situations are reviewed in connection with different stages of decommissioning and their related problems, as the residual radioactivity of different components, and the size of the final wastes to be disposed of. The possibilities of plant life extensions are also revised in connection with these problems. Finally, the expected decommissioning costs are analyzed. (Author) [es

  5. Construction status report: nuclear power plants, data for decisions. Status report

    International Nuclear Information System (INIS)

    1976-01-01

    The document is the 28th edition summarizing the results of a management information system established by the Executive Director for Operations on the construction/fuel load activities of nuclear power plants. The report uses data collected from applicants sponsoring these projects, Office of Inspection and Enforcement, and the Office of Standards Development; and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of 87 plants authorized to engage in construction in Region I through V is summarized in this document. This total includes (4) plants with construction exemptions, and (14) plants with an LWA

  6. Fostering of Innovative Talents Based on Disciplinary Construction: HRD Strategy of Chinese Nuclear Power Industry

    International Nuclear Information System (INIS)

    Ye Yuanwei

    2014-01-01

    Workforce challenge to nuclear power industry: • We are facing the aging workforce and talent loss since the tough time of nuclear power industry. • Professional workforce fostering in nuclear power industry always needs a long period of time. • Professional workforce fostering in nuclear power industry is a systematic and interdisciplinary work. Talents fostering in nuclear power industry: Major measures → national overall planning; engineering practice; knowledge management; disciplinary construction; cooperation and communication

  7. Improvement of QA/QC activities in the construction of nuclear power plant

    International Nuclear Information System (INIS)

    Jinji Tomita; Shigetaka Tomaru

    1987-01-01

    Construction of commercial nuclear power plants in Japan started at around 1965. In this presentation are described quality assurance (QA) activities of a plant supplier who is a manufacturer of the key components as well. The QA activities until now are divided into several periods of the construction history in Japan. First term is 1960's when the QA activities are featured as the study and implementation through the construction of imported plants. Since then technologies and procedures of our own have been established and improved for the construction of high reliability plants. Our present QA activities are based on the active reflection of those lessons learned of past experiences. (author)

  8. Nuclear power plants. Construction status report, data as of September 30, 1977

    International Nuclear Information System (INIS)

    1977-10-01

    The report provides information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. T he status of 93 plants authorized to engage in construction activities is summarized. This total includes (4) plants with construction exemptions, and (11) plants with Limited Work Authorization Permits

  9. 'Concrete shell formwork' technology applied to the construction of the Paks Nuclear Power Plant

    International Nuclear Information System (INIS)

    Fejes, A.

    1982-01-01

    The conventional formworking technology could not meet the unusual requirements needed in constructing the concrete walls of the nuclear power plant building. A new concrete shell formworking developed in the Soviet Union has been adapted to meet the criteria. Prefabricated concrete shells are mounted separately during construction on separated parts of the reinforcing structure. The steps of the construction process are described with the economic evaluation of this new construction technology. (R.P.)

  10. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  11. Approaches to assessment of socio-demographic and economic aspects of nuclear power plant construction and operation

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    The paper informs of solving the task of economic evaluation of transient and permanent social consequences of the construction and operation of nuclear power plants. The solution takes place in three stages: 1. drafting of methodology, 2. trial of methodology in localities of current nuclear power plant construction, 3. analysis of results and finalizing of methodology. The task is aimed at studying the questions of the return and profitability of investments, the evaluation of optimal economic lifetime, and the effective restoration of basic funds. Its model solution shows the national economy relations of nuclear power. Also discussed is the question of the use of non-balance heat from nuclear power plants. (E.S.)

  12. The quality control for biological-shield heavy concrete construction of nuclear power project

    International Nuclear Information System (INIS)

    Sun Hongjun; Ma Xinchao

    2012-01-01

    The paper introduces the function and characteristics of biological protective heavy-concrete, and its main application scope and role in Fangjiashan nuclear power project. From the aspects of raw material selection, mixing ratio test, heavy concrete production, the paper discusses the main control points of heavy concrete construction process, points out the basic characteristics of heavy concrete construction, and put forward measures to prevent density non-uniformity during heavy concrete construction and to control slump during transportation. Results prove that reasonable construction process control can assure the engineering quality. (authors)

  13. Discussion on construction of scientific and technological digital library in nuclear industry

    International Nuclear Information System (INIS)

    Yin Huilan

    2010-01-01

    With the rapid development of digital and network technology, traditional libraries have been unable to meet the needs of the times. Digital libraries will gradually take the place of traditional libraries. Under the circumstances, how will the libraries of the enterprises in nuclear industry face this transformation? This paper gives the brief descriptions and comparative analyses in the four aspects: the definition of the digital library, the meaning of nuclear scientific and technological digital library, the characteristics of the digital library, and major problems in the construction of nuclear scientific and technological digital library that should be solved. Therefore, setting up the digital library is very important. At the same time, it's very necessary and urgent for the libraries of the enterprises in nuclear industry to establish nuclear scientific and technological digital library. (author)

  14. Socio-demographic and economic aspects of nuclear power plant construction and operation

    International Nuclear Information System (INIS)

    1984-01-01

    The proceedings contain 10 papers of which 9 have been inputted in INIS. The papers deal with the economic, social and ecological consequences of the construction of nuclear power plants. Various approaches are listed to the economic evaluation of the said consequences. The question is discussed of the efficiency of investments for the construction of nucliear power plants as are the probiems of sitting large projects. (E.S.)

  15. Rock cavity construction of a nuclear power plant: a case study

    International Nuclear Information System (INIS)

    Loken, P.C.; Bakke, J.; Gloersen, I.

    1979-01-01

    The major findings of a comprehensive study of the major aspects of rock cavity construction of a large nuclear power plant are: (1) current technology is adequate for the realization of such construction; (2) a method for estimating the probability of rock fallout and gross cavity instability is presently not available; (3) certain design modifications and amplifications must be made to prevent dependent failures; (4) no significant reduction in the immediate radiological effects of Class 9 accidents will result unless special design measures are made for this purpose; (5) the vulnerability of the plant to certain external effects is significantly reduced; (6) the total time for the realization of such construction will be significantly longer than that for a traditionally constructed plant; and (7) the extra cost will be substantial

  16. Analysis of the financial task generated by the construction of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Alonso, G.; Ramirez, R.; Palacios, J.; Delfin, A.

    2011-11-01

    The construction of new nuclear reactors requires of a high investment making them intensive projects in capital and that require as minimum of 5 years for its construction. The financial task that represents for the electric company is of vital importance, since in the case of privates in other countries prevents them of entering in this type of projects if they do not have its Government support. In the case of Mexico, being an electric company integrated vertically can have financing to carry out this investment type. In this study is analyzed the construction viability of new nuclear reactors in Mexico based on the financial task that represents for the Electric Company its construction. (Author)

  17. Duct corrosion in the ventilating air conditioning system for Main Control Room

    International Nuclear Information System (INIS)

    Yamada, Kohei; Kobayashi, Takashi; Minami, Akiko; Fukuba, Kazushi

    2014-01-01

    Higashidori Nuclear Power Station, start-of-operation in December 2005, is a relatively new plant. We decided to get original data of air duct condition to determine maintenance policy of air duct, because planned maintenance of air duct has never been done and the corrosion of air duct has occurred in other plant. In January 2014, we found a corrosion-hole at the downstream of the inlet damper in the ventilating air conditioning system for Main Control Room (MCR). We supposed that the cause of rapid corrosion is related to the characteristic environment of this site. (author)

  18. Construction of sustainability indicators for Nuclear Area Innovation and Research Institutes in Brazil

    International Nuclear Information System (INIS)

    Alves, Simone Fonseca

    2017-01-01

    The dissertation consists of a construction of appropriate sustainability indicators for nuclear area innovation and research institutes in Brazil. In order to do so, the results of the construction process, as well as, the perception of the population that resides in the area surrounding this type of institute are presented and discussed. As reference for this case study, the Nuclear Technology Development Center (CDTN) was chosen. It is located in Pampulha, more specifically, on the campus of the Federal University of Minas Gerais (UFMG), Belo Horizonte, MG, Brazil. One of the methodological processes present in this research is the Delphi method, because it is the most used in the construction of indicators. Its application in this work allowed obtaining the of specialist group opinions collected through a questionnaire. Initially, sixty-nine sustainability indicators were considered. They were distributed among the environmental, economic, socio cultural and institutional dimensions, some of which were obtained through lists of indicators pointed by literature review. Other indicators were built through discussions with groups from the nuclear, environmental, economic and socio cultural areas. Among the set of indicators investigated, twenty-six were selected as being the most relevant. A questionnaire was then applied to one hundred and twenty individuals living in the vicinity of the CDTN. Discrepancies were found during the analysis the opinions of the experts in relation to sustainability dimensions proposed, as well as, indicators of the same dimensions were varied. However, the opinion of the population and the opinion of the experts had similar results. Finally, this study is the first proposal for the nuclear sector to construct this kind of indicator that takes into account the evaluation of experts and the opinion of the community that resides around these institutions. (author)

  19. Outline of preparation construction of Shimane Nuclear Power Station No.3

    International Nuclear Information System (INIS)

    Oda, Yasuhiro; Sasaki, Yutaka; Matsukage, Shigeo; Kawahara, Kazufumi

    2004-01-01

    The preparation construction of Shimane Nuclear Power Station No.3 (No.3) started on 15th March in 2004. The main preparation construction consist of the site preparation, revetment works, breakwater works, production of blocks, flood-way and outlet works. The outline of the project is described by the time schedule of work, the cross section of site preparation, site, the revetment method used, the cross section of representative breakwater, structure style and improvement works of flood-way and outlet and content of each works. (S.Y.)

  20. Quality assurance in the construction phase of the Guangdong Daya Bay Nuclear Power Plant

    International Nuclear Information System (INIS)

    Chen Heling; Zou Xiaoshun

    1994-11-01

    The quality assurance system of Guangdong Daya Bay Nuclear Power Plant during construction phase is briefly introduced. It includes the quality assurance organization and multiple quality control system of the owner (GNPJVC) and contractors. The status of the programmes implementation has been also described through presenting of some important quality assurance activities such as quality surveillance, QA audit and nonconformance control. In addition, the effectiveness of GNPP Construction QA Program has been analyzed and evaluated and both positive and negative experience have been summarized which could be used for reference by the nuclear power constructors. (6 figs.)

  1. Quality assurance in the construction phase of the Guangdong Daya Bay Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Heling, Chen; Xiaoshun, Zou [Guangdong Nuclear Power Joint Venture Company (China)

    1994-11-01

    The quality assurance system of Guangdong Daya Bay Nuclear Power Plant during construction phase is briefly introduced. It includes the quality assurance organization and multiple quality control system of the owner (GNPJVC) and contractors. The status of the programmes implementation has been also described through presenting of some important quality assurance activities such as quality surveillance, QA audit and nonconformance control. In addition, the effectiveness of GNPP Construction QA Program has been analyzed and evaluated and both positive and negative experience have been summarized which could be used for reference by the nuclear power constructors. (6 figs.).

  2. A majority in favour of the construction of further nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The results of an opinion poll of 5000 German-speaking persons in Bern Canton, Switzerland are summarised and commented on. 54% of those questioned expressed approval of further nuclear power station construction in Switzerland. (F.Q.)

  3. Rationalization of design and construction of buildings for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-02-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.).

  4. Rationalization of design and construction of buildings for nuclear power plants

    International Nuclear Information System (INIS)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-01-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.)

  5. Construction of Kashiwazaki-Kariwa Nuclear Power Station Results of manufacturing concrete

    International Nuclear Information System (INIS)

    Morishita, Hideki; Tsuchiya, Yoshimasa; Eguchi, Kiyoshi; Hosaka, Hiroshi

    1998-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station of Tokyo Electric Power Co., Inc. was completed in July, 1997. Seven nuclear power plants generate about 8.2 million kW, and it is the largest nuclear power station in the world. In the construction, from May, 1980 to August, 1996, the concrete of 2.42 million m 3 for architecture and 1.04 million m 3 for civil engineering, 3.46 million m 3 in total, and the mortar for artificial rock bed of 430,000 m 3 were manufactured and placed. The results of manufacturing concrete from beginning to finish are shown. The specification of concrete was different for No. 1 plant, No. 2 and 5 plants, No. 3 and 4 plants and No. 6 and 7 plants. As to the mixing of concrete, the specification and the materials used are reported. The features of the facilities for manufacturing concrete are explained. The flowchart of the quality control of materials and concrete is shown. The material testing of cement and aggregate, the test of water quality and the material testing of admixtures were carried out. As for concrete, the weight of unit volume, slump, air quantity, concrete temperature, chloride content, strength and alkali reactivity were examined. (K.I.)

  6. Business data processing in the service of quality and safety in nuclear power plant construction

    International Nuclear Information System (INIS)

    Chassignet, C.

    1980-01-01

    Construction of a nuclear power plant implies collection and correlation of several thousand items of information which must be identified and which must remain retrievable throughout the service life of the plant. The Framatome Corporation, which has one of the largest nuclear power plant construction programs in the world, therefore set up a processing and checking system for the documents containing this information. The author describes the functions and principles of this system (known as SHARAD), together with its technical data and its operation [fr

  7. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  8. Management self-assessment in construction phase of nuclear power station

    International Nuclear Information System (INIS)

    Shao Bixiu

    2004-01-01

    Management self-assessment is one of the quality management methods to achieve the organization's continuous improvement. Through the investigation of the methods, the author hopes to give guideline to the management at all levels involved in the construction of nuclear power station in the implementation of management self-assessment, and also to make the management self-assessment more normalized, systematical and effective

  9. Pretension construction of safety shell in Chashma nuclear power plant

    International Nuclear Information System (INIS)

    Gong Zhenbin; Li Yinong; Ni Shaowen

    1999-01-01

    19T16 post-tension grouped anchor system is applied to the safety shell pretension in Chashma Nuclear Power Plant. The stretching force of each bundle is about 3800 kN and the prestressed reinforcement is stretched in five stages. The double-control measurement of stress controlling and extension checking is applied in strict accordance with the principle of symmetrical construction

  10. Needs for Constructing and Possibilities of Nuclear Power Plants Interconnection to the Croatian Electricity Grid

    International Nuclear Information System (INIS)

    Zeljko, M.; Bajs, D.

    1998-01-01

    Due to development of electric power system and considering an increase of electrical energy consumption, needs for larger units in new power plants are obvious. Connection of large nuclear power plants to the grid, depending on their power and location, usually requires significant investments in transmission network development and construction. Considering the capacity of the 400 kV transmission network in Croatia, this problem is evident. This paper deals with the possibilities of nuclear power plants construction, as one possible option in electric power system development, and their interconnection to the electricity grid. (author)

  11. Forecasting manpower requirements for nuclear power plant construction

    International Nuclear Information System (INIS)

    Seltzer, N.; Schriver, W.R.

    1978-01-01

    This paper presents both the methodology and results of a segment of a comprehensive construction manpower demand forecasting system aimed at forecasting virtually all construction manpower requirements in the United States of America. The part of the system dealing with the demand for construction workers needed to build nuclear powered electricity generating plants is discussed here. The object of the system is to forecast manpower construction needs for each of 29 construction crafts on a monthly basis in each of 10 geographical regions of the United States. The method used is to establish profiles of the types of workers and time phasing required in the past. Profiling was done for different types of plants, different capacity classes, and different geographical locations. An appropriate worker profile matrix cannot simply be multiplied by the capacity of the proposed plant if the number of man-hours required per kilowatt of generating capacity is not constant. The value of this latter variable has changed considerably recently - presumably because of an increased awareness of environmental and safety considerations. Econometric techniques are used to forecast values for man-hours per kilowatt which are then multiplied by projected new capacity to be put in place. The resulting total man-hour requirement is then allocated over time and by craft through use of a worker profile matrix. The summary results indicate that 20 percent increases in man-hours required per kilowatt of capacity can be expected between 1977 and 1981. Total construction labour demand will rise from 65,700 work-years in 1977 to nearly 96,600 work-years in 1981. Forecasts of the actual number of different types of workers to be demanded in each month and in each region are available from the system. (author)

  12. Introduction of construction management system for preparation work of Shimane Nuclear Power Station Unit-3

    International Nuclear Information System (INIS)

    Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji

    2005-01-01

    The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)

  13. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    International Nuclear Information System (INIS)

    Timothy Shaw; Vaugh Whisker

    2004-01-01

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project

  14. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Vaugh Whisker

    2004-02-28

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project.

  15. The energy input in the construction and operation of nuclear power stations

    International Nuclear Information System (INIS)

    Kolb, G.; Niehaus, F.; Rath-Nagel, S.; Voss, A.

    1975-08-01

    The production of electric energy requires energy investments not only for direct fuel input but for the construction of power plants and for the extraction of primary energy fuels as well. When the overall energy balance of energy converting systems has to be assessed these energetic investments must be included. In the present investigation the overall energy input of different nuclear power plant types (comprising the nuclear fuel cycle) is computed and compared with a coal-fired plant. Moreover a time-dependent energy balance for the expansion of nuclear capacity according to the existing nuclear programs is calculated. Even applying only Light Water Reactors the nuclear expansion program (with an installed capacity of 50 GWsub(el) in 1985 and 170 GWsub(el) in 2000) would result in an accumulated fossil fuel saving of approximately the tenfold amount of primary energy consumed in the Federal Republic of Germany yearly today. (orig.) [de

  16. International comparison of economic and technical indexes of nuclear power plant construction

    International Nuclear Information System (INIS)

    Majer, P.; Fialova, H.

    1988-01-01

    The comparison of capital costs of the construction of nuclear power plants takes into consideration the following aspects: the delineation of the installation, the determination of costs and their break-down, the impact of the time factor, the conversion of the costs to a comparable unit. Power plants are always compared with roughly the same power capacity, this even when conditions for construction are not fully comparable. Construction costs may be divided into, e.g., pre-construction costs, direct capital costs, indirect capital costs, interest during construction. The time factor is manifest in the duration of construction and in the concrete year of construction for which the comparison is being made. The inflationary rise in prices and interests are increasing capital costs by roughly 5 - 8% per annum. The comparison of costs expressed in different currencies is made either by conversion using the rate of exchange or by comparing the time expended for the construction of the power plant. Various methods of comparison are discussed. (J.B.). 7 refs

  17. Flood control construction of Shidao Bay nuclear power plant and safety analysis for hypothetical accident of HTR-PM

    International Nuclear Information System (INIS)

    Chen Yongrong; Zhang Keke; Zhu Li

    2014-01-01

    A series of events triggered by tsunami eventually led to the Fukushima nuclear accident. For drawing lessons from the nuclear accident and applying to Shidao Bay nuclear power plant flood control construction, we compare with the state laws and regulations, and prove the design of Shidao Bay nuclear power plant flood construction. Through introducing the history of domestic tsunamis and the national researches before and after the Fukushima nuclear accident, we expound the tsunami hazards of Shidao Bay nuclear power plant. In addition, in order to verify the safety of HTR-PM, we anticipate the contingent accidents after ''superposition event of earthquake and extreme flood'', and analyse the abilities and measures of HTR-PM to deal with these beyond design basis accidents (BDBA). (author)

  18. Judicial problems in connection with preliminary decision and construction design approval in nuclear licensing procedures

    International Nuclear Information System (INIS)

    Schmieder, K.

    1977-01-01

    Standardization in nuclear engineering makes two demands on a legal instrument which is to make this standardization possible and which is to promote standardization in the nuclear licensing practice: On the basis of just one licence for a constructional part or a component, its applicability in any number of subsequent facility licensing procedures has to be warranted, and by virtue of its binding effect, standardization has to create a sufficiently big confidence protection with manufacturers, constructioneers and operators to offer sufficiently effective incentives for standardization. The nuclear preliminary decision pursuant to section 7 a of the Atomic Energy Act in the form of the component preliminary decision appears to be unsuitable as a legal instrument for standardization, as the preliminary decision refers exclusively to the construction of a concrete facility. For standardization in reactor engineering, the construction design approval appears to be basically the proper legal instrument on account of its legal structure as well as its economic effect. Its binding effect encouters a limitation with regard to third parties in so far that this limitation could question again the binding effect in a subsequent site-dependent nuclear licence procedure. The legal structure of the extent of the binding effect, which is decisive for the suitability of the construction design approval, lies with the legislator. The following questions have to be regulated: Ought the applicant to have a legal claim on the granting of a construction design approval, or ought it to be at the discretion of the authorities, and secondly, the extent of the binding effect in terms of time on the basis of the fixation of a time limit, or on the basis of the possibility of subsequent conditions to be imposed, or the revocation. (orig./HP) [de

  19. Selection and construction of nuclear and radiation emergency medical center in a region

    International Nuclear Information System (INIS)

    Wang Guojun; He Xu; Liao Li; Gao Dong

    2014-01-01

    Three level of first-class comprehensive hospital is an important force of nuclear and radiation accident rescue, has a very rich experience in response to nuclear and radiation accidents and deal with large quantities of the sick and wounded. With the foundation and the ability of the construction and operation of medical emergency rescue center. This paper according to the median model location theory of emergency center, combined with the specific situation of the nuclear and radiation accident in Hunan Province, reference location, rescue experience, emergency allocation of resources, teaching and research capacity, establish regional medical emergency center of nuclear and radiation accidents based on three level of first-class comprehensive hospital, break the traditional concept that the center must be provincial capital,form a multi-level, three-dimensional, network of emergency hospital rescue system. The main duties of the center are accident emergency response, on-site treatment and technical guidance of accident, psychological grooming. The author propose building measures according to the duties of the center: increase national and provincial financial investment, carry out training, drills and first aid knowledge missionaries regularly, innovative materials management, speed up the construction of information platform, establish and improve the hospital rescue system, improve organization institution and system of plans, reengineering rescue process. (authors)

  20. Nuclear power plants in Europe 1995. Report about operation, construction, and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Report about Operation, Construction, and Planning in 18 European Countries Eighteen European countries operate and build, respectively, nuclear power plants in 1995. The ''Nuclear Power Plants in Europe 1995'' atw report singles out the main events and lines of development. As per August 1995, 214 (1994: 215) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 177,010 (176,322) MWe installed gross capacity are in operation in seventeen countries, and 26 (30) units with 24,786 (28,086) MWe are under construction in seven countries. This adds up to a total of 240 (245) nuclear generating units with an aggregate 201,796 (204,408) MWe. In the nuclear power plants in Europe, some 1048 TWh of nuclear power was converted into electric power in 1994; 792 TWh of this aggregate was converted in 137 units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 36%. Lithuania, with 77%, has the highest share of nuclear power in Europe, followed by France with 75% and Belgium with 56%. The lowest percentage, only 5%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power plants are operated, such as Italy or Austria. (orig.) [de

  1. Risk management and nuclear human resources management in construction nuclear power plants in the Gulf Countries

    International Nuclear Information System (INIS)

    Saeed Hakami; Salim Almarmary

    2009-01-01

    The countries of the Gulf region have the capacity to rapidly expand their economic growth and gross domestic product (GDP). Also, one may observe that their growth rate is very high. To match this, they need a mix of energy sources for this economic growth. Nuclear power plants can have a significant role as a source of energy in the Gulf countries. Although, some of the Gulf countries signed contracts to construct nuclear power plants, they still require high a level of education as well as sufficient and adequate human resources in order to solve complex issues which may happen at nuclear power plants. The objective of this paper is to identify the complex issues that may arise at a nuclear site. Then the paper goes on to discuss how to evaluate these issues. Finally, the paper studies how to manage and control such complex issues in the work place. The advantage of highly educated people as well as sufficient and adequate human resource can increasingly protect and save human health and the natural environment from issues relating to the use of nuclear energy. There are vast theories, strategies and tools that have discussed in regards to human resources management in the nuclear industries. However, this paper chiefly provides a new risk management methodology. This methodology helps to highlight the risk factors and their consequences at nuclear sites. This paper is intended to decrease risks; to protect human health in the work place at nuclear power plants and save the environment within and beyond national borders and for future generations. It aims to increase safety from the use of nuclear energy, particularly in the Gulf countries.(Author)

  2. Role of civil engineers in design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Sivathanu Pillai, C.

    2015-01-01

    Nuclear energy remains an important element in India's energy mix for sustaining rapid economic growth. In the Indian energy scenario projections for the future, nuclear power through fast reactors has been considered as an important component. Fast reactors are also planned to be built in the medium term to burn minor actinides as means of reducing the burden of radioactive waste management. Nuclear power in India provides 3% of the electricity generated in the country now; it is estimated to go up to 25% by 2050. India has a special interest in developing fast breeder reactors and use of thorium as a source of energy as it has one of the largest reserves of thorium. Nuclear industry always provides challenging works to civil engineers. From geotechnical investigation, structural analysis, design, construction and to material developments and provides unique opportunity for excellence

  3. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  4. Nuclear reactor internals construction and failed fuel rod detection system

    International Nuclear Information System (INIS)

    Frisch, E.; Andrews, H.N.

    1976-01-01

    A system is provided for determining during operation of a nuclear reactor having fluid pressure operated control rod mechanisms the exact location of a fuel assembly with a defective fuel rod. The construction of the reactor internals is simplified in a manner to facilitate the testing for defective fuel rods and the reduce the cost of producing the upper internals of the reactor. 13 claims, 10 drawing figures

  5. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  6. A qualitative model construction method of nuclear power plants for effective diagnostic knowledge generation

    International Nuclear Information System (INIS)

    Yoshikawa, Shinji; Endou, Akira; Kitamura, Yoshinobu; Sasajima, Munehiko; Ikeda, Mitsuru; Mizoguchi, Riichiro.

    1994-01-01

    This paper discusses a method to construct a qualitative model of a nuclear power plant, in order to generate effective diagnostic knowledge. The proposed method is to prepare deep knowledge to be provided to a knowledge compiler based upon qualitative reasoning (QR). Necessity of knowledge compilation for nuclear plant diagnosis will be explained first, and conventionally-experienced problems in qualitative reasoning and a proposed method to overcome this problem is shown next, then a sample procedure to build a qualitative nuclear plant model is demonstrated. (author)

  7. A Careful Blasting Technique During Construction of underground Openings for Nuclear Waste Repository

    International Nuclear Information System (INIS)

    Ester, Z.; Vrkljan, D.

    1998-01-01

    Underground nuclear waste repositories are constructed in natural rock formations, with heterogenous compound and structure, and should be accommodated in design and construction according to rock conditions. The quality insurance of underground repository, during and after construction, is most demanding in view of contour and category of excavation. the technology of drilling and blasting, regarding the mechanical excavation, is accommodated in sense of response to cross section magnitude of underground openings, the rock conditions and category, the support performance and other design demands. The high level rock damage around underground openings, that is in opposition with reaching quality insurance. Conventional construction technology can be successful by implementation of controlled blasting technique avoiding extensive rock weakness. (author)

  8. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  9. ABB.-Combustion Engineering's Experience in Nuclear Power Plant Engineering and Construction in Korea

    International Nuclear Information System (INIS)

    Veris, James W.

    1992-01-01

    The Yonggwang Nuclear Project is a milestone project for the Korean Nuclear Industry. The Project has the two objectives of obtaining self-reliance in all aspects of nuclear technology and of constructing two modern nuclear power plants under the leadership of Korean companies acting as prime contractors. ABB.-Combustion Engineering 1000 MW System 80+ TM was chosen in 1987 as the NSLS design to meet these two objectives. This paper summarizers the significant experiences and lessons learned through the first four years of the Project as well as identifying implications for such future projects. The unique challenges of the project are identified and an evaluation of the experiences in the technology, self-reliance program and in the design and manufacturing processes will be made

  10. Study of the influencies of Angra-1 nuclear power plant construction in Angra dos Reis

    International Nuclear Information System (INIS)

    Ferreira Netto, L.

    1982-01-01

    The report presents a comprehensive evaluation of the influence caused by Angra-1 Nuclear Power Plants (Central Nuclear Almirante Alvaro Alberto) construction on the Angra dos Reis City - Rio de Janeiro - Brazil. The analysis performed adopts a multi-dimensional methodology with four analysis dimensions: political-institutional, physical-territorial, social-economic and temporal. (author)

  11. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Baddley, A.H.

    1981-01-01

    A method of constructing a radiation shielding plug for use in the roof of the coolant containment vault of liquid metal cooled fast breeder reactors is described. The construction allows relative movement of that part of service cables and pipes which are carried by the fixed roof and that part which is carried by the rotatable plug. (U.K.)

  12. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  13. Authorization procedure for the construction and operation of nuclear installations within the EC Member States, including supervision and control

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Didier, J.M.

    1978-01-01

    This report is an updating of the report EUR 5284, Authorization procedure for the construction and operation of nuclear installations within the EEC Member States, prepared in 1974 by J.M. Didier and Associates. Recent developments regarding the authorization procedure for the construction and operation of nuclear installations have taken place in Italy (introduction of a site approval procedure) and in Denmark (adoption of an overall legislation on the subject, however not yet in force). With respect to supervision and control of nuclear installations during construction and operation, competences of, as well as their exercise by, supervisory authorities in all EC Member States, with the exception of Ireland, are also analysed in the current study

  14. Strategy of plant concept development in Hitachi

    International Nuclear Information System (INIS)

    Kumiaki, Moriya

    2007-01-01

    Hitachi contributes to the society in various fields of nuclear power such as the Light Water Reactor field, the Fast Breeder Reactor, the fuel cycle, and the medical treatment. Since the beginning of a first commercial operation of a BWR in Japan, Hitachi has constructed 20 units of BWR. Hitachi continues its efforts in achieving high reliability and large-scale output, and in 1996, it completed Advanced Boiling Water Reactor (ABWR) in cooperation with various BWR utilities, General Electric Company, and Toshiba Corporation. Hitachi has enhanced the ABWR technology further based on the above enough experience. The latest technologies were reflected in Hamaoka unit 5 and Shika unit 2 as the latest ABWR plants. The further upgrade technologies would been reflected in Shimane-3, Ohma-1 and Higashidori-1 as ABWR plants under planning. Hitachi obtains the chance to construct the nuclear power plant continuously. For the next generation, Hitachi is working on developing nuclear power plants that take diversified needs and global characteristics into account. As one of the approaches, the output series formation of BWR is extended as the following. ABWR-II and ESBWR (Economic and Simplified BWR) as a large-scale centralized power supply emphasizing cost efficiency, Medium size ABWR and natural circulation type BWR as medium and small-scale distributed power supply that features flexibility to various market needs, such as minimized capital risks, timely return on a capital investment, etc. As another approach, Hitachi tries to extend the Light Water Reactor technology. RBWR (Resource-Renewable BWR ) that achieves a high conversion ratio over 1.0 based on the BWR technology will make the fuel cycle flexible. Hitachi will continue the challenge for the next ABWR and the future with the enough experience of BWR construction. (author)

  15. Construction, start-up and operation of Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Hornicek, Z.

    1989-01-01

    The Labor Safety Inspectorate have been supervising the construction of the Dukovany nuclear power plant since the construction start in 1977. It was found that in concreting the reactor building walls with concrete mixes, the regulations were not observed on the highest level for the concrete mix drop, and on the gap processing and concrete treatment when concreting was interrupted. Thus, concreting was halted until the conditions for concreting were met. Attention was focused on the protection of the hermetic casing from damage, which had very often happened. A number of shortcomings were detected in storing technology parts. The cleanliness was inspected of the facilities being assembled. The inspections also revealed shortcomings in sealed space tightness. The inspections of assembly and testing of facilities showed failures of the facilities themselves (control valves, electric motors, filter and pump sealing) and of the assembly process. Faults were also detected in electrical equipment. Only a very small part of the installation showed lifetime as specified by Decree 105/1982 Coll. laws on safety assurance in the nuclear power industry. Missing data in documentation led to delays in the start-up stages. The State Surveillance Body also inspected the results of equipment testing. Prior to physical start-up, all production facilities and buildings were inspected, labor safety was inspected for all personnel in communicating corridors, staircases, manholes and onservice and handling posts. Shortcomings were removed. The organization of assembly work was a considerable problem if staff from more organizations had to work together in the same workplace. A list of tasks is presented of State Surveillance Body in operation, maintenance, outages, repairs, and troubleshooting in a nuclear power plant. (J.B.)

  16. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  17. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  18. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  19. Consideration of the legal system required for achievement of current nuclear power plant construction programmes

    International Nuclear Information System (INIS)

    Castellon Fernandez, E.; Forum Atomico Espanol, Madrid)

    1976-01-01

    The extensive nuclear power plant construction programmes currently in progress in western countries require updating of the legislation in force in this field, especially as regards the following: acquisition of the sites necessary by means of a national planning programme of available sites; simplification of formalities concerning issuance of administrative licenses; revision of the principle of absolute and exclusive liability of the nuclear operator which forms the basis of the third party liability system for nuclear damage; radioactive waste management and decommissioning of nuclear plants. Furthermore, this new legislation should be harmonized between the different countries concerned. (N.E.A.) [fr

  20. Design and construction features of steam generators at a nuclear power station

    International Nuclear Information System (INIS)

    Chakrabarti, A.K.; Gupta, K.N.; Bapat, C.N.; Sharma, V.K.

    1996-01-01

    The Indian nuclear power programme is based on Pressurised Heavy Water Reactors (PHWRs) using natural uranium as fuel and heavy water as reactor coolant as well as moderator. The nuclear heat is generated in the fuel located in the pressure tubes. Pressurised heavy water in the primary heat transport (PHT) system is circulated through the tubes which picks up the heat from the fuel and transfers it to ordinary water in steam generators (SGs) to produce steam. The steam is used for providing power to the turbine. The steam generator is a critical equipment in the nuclear steam supply system (NSSS) of a nuclear reactor. SG tube surface area constitute about 80% of total primary circuit surface area. A typical value in a 220 MWe reactor is 9000 m 2 which can release considerable amount of corrosion products unless very low corrosion rates are achieved by proper design, material selection and water chemistry control. Design and construction features of SGs are given. 1 tab

  1. A nuclear power enterprise debt management system construction Based on Sanmen Nuclear Power Co., LTD, debt risk management case analysis

    International Nuclear Information System (INIS)

    Wu Yan; Liu Shuqing

    2010-01-01

    Building nuclear power enterprises need huge investment , often tens of billions RMB. How to do a good job in corporate debt risk management, becoming powerful large-scale development of nuclear power ,ensuring the supply of funds and existing debt service in the process of large-scale development of nuclear power ,is an important task. In this paper, managing the company's debt is very urgent and necessary through analysis of SMNPC financing and debt structure; through the analysis of SMNPC's debt risk management , the authors would like to explore how to build up the framework of the debt management under the large-scale development of nuclear power construction . Nuclear power enterprises need to strengthen supervision mechanism and internal control,build-up and perfect all-round debt risk manage system, keep watch on debt risk in order to ensure preservation and increment of the value of state assets. (authors)

  2. Quality assurance of civil works during the construction of a nuclear power plant in Germany, F.R

    International Nuclear Information System (INIS)

    Hillemeier, B.

    1980-01-01

    During the construction of Nuclear Power Plants in Germany extended system-oriented steps will have to be mentioned, which the 'Kerntechnischer Ausschuss' has gathered up in his KTA-rules. The lecture outlines the organization and the performance of QA-requirements which are the common and lawful basis for the construction in Germany. The organizational structure and the functional responsability assignments at HOCHTIEF, one of the leading European contractors, will be represented. At last the QA-procedures will be described for a Nuclear Power Plant under erection. (orig.)

  3. Notes on third party liability for nuclear damage in connection with the construction of the first nuclear power plant in Brazil

    International Nuclear Information System (INIS)

    Simoes, A.C.

    1975-01-01

    Responsibilities for the construction and operation of the first nuclear power plant have been transferred from the National Nuclear Energy Commission to Electrobras, a public undertaking set up for this purpose. In view of such transfer of responsibilities and the implementation of further nuclear power projects, liability for nuclear damage has to be regulated in a way consistent with international conventions. A working group associating representatives of national authorities and public utilities was entrusted with the task of drafting rules for co-ordinating their respective activities in relation to the execution of the first nuclear power project; these rules were issued by Ministerial order in 1970. The working group also prepared a draft law on civil liability for nuclear damage, based on the Vienna Convention. This draft law has reached its final stage and, after promulgation, will enable Brazil to ratify the Vienna Convention. (author)

  4. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  5. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  6. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  7. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant...

  8. Method of constructing lower dry well access tunnel for nuclear reactor container

    International Nuclear Information System (INIS)

    Kume, Tadashi; Furukawa, Hedeyasu.

    1993-01-01

    The method of the present invention facilitates construction of a lower dry well access tunnel for a nuclear reactor container. The lower dry well access tunnel is constructed across the reactor container and the reactor main body foundation. In this case, the lower dry well access tunnel is divided into three sections, i.e., axial end portions and a central portion. At first, each of the end portions is attached to the walls of the reactor container and the reactor main body foundation respectively. Subsequently, the central portion is attached to each of the end portions. An adjusting margin is previously provided to the central portion upon manufacturing each of the sections for adjusting deviation from a nominal size upon construction. In such a construction method, it is possible to eliminate interference accident during construction between the end portions of the lower dry well access tunnel and the reactor container and the reactor main body foundation, to facilitate the construction. Further, this facilitates the fabricating operation for dimensional alignment between the lower dry well access tunnel, and the reactor container and the reactor main body foundation. (I.S.)

  9. Country Report Summary: Japan [Project Management in Nuclear Power Plant Construction: Guidelines and Experience

    International Nuclear Information System (INIS)

    2012-01-01

    The Hokkaido Electric Power Company (HEPCO) is the owner of the Tomari NPP comprising three operating PWR units. The latest unit to be connected to the grid, Tomari Unit 3, is a 3-loop PWR power plant with an electric output of 912 MW(e) supplied by Mitsubishi Heavy Industries (MHI). This is the newest unit in HEPCO and it is the newest PWR unit in Japan as well. The first concrete at Tomari Unit 3 was poured at the end of summer in 2004. The unit entered into commercial operation in December 2009. The Tomari site is located on a northern Japanese island. It is battered by strong winds and receives much snow in the winter. Therefore, civil works and building construction were temporarily suspended every year from the beginning of December until the end of March. This increased construction duration by one year compared to other sites. Consequently from first concrete to the start of commercial operation construction at Tomari lasted 64 months. There are specific factors in the approach to construction of nuclear power plants in Japan. (1) Japanese legislation defines that the sole licensee must be the electric power company. This implies that the electric power company is responsible for the safety of the plant and in that capacity it must submit for approval the Safety Analysis Report (SAR) but it is also responsible for the design and reliability of the plant; hence it must also submit for approval the Construction Plan (CP), containing all necessary detailed design information. Consequently, the electric power company becomes the sole counterpart to the regulatory body on all aspects of the project. (2) All Japanese electric power companies are considerably large and have the tradition to do the engineering of their power plant themselves, and this not only for nuclear but also for conventional power plant. Therefore, the owner/utilities in Japan carry themselves the burden of major portions of the engineering, procurement and construction (EPC) of their NPPs

  10. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  11. Construction works of large scale impervious wall in construction of No.2 plant in Onagawa Nuclear Power Station, Tohoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Ueda, Kozaburo; Sugeno, Yoshisada; Takahashi, Hitoshi

    1991-01-01

    The main buildings for No. 2 plant in Onagawa Nuclear Power Station are constructed on the bedrocks about 14 m below the sea surface. Therefore, for the purpose of executing the works by shutting seawater off and dry work, the large scale impervious wall of about 500 m extension was installed underground. The feature of this impervious wall is the depth of embedment of about 3 m into the hard bedrocks having the uniaxial compressive strength of 2000 kg/cm 2 at maximum, carried out with the newly developed hard rock excavator. The outline of these construction works is reported. No. 2 plant in Onagawa Nuclear Power Station is the BWR plant of 825 MWe output. The construction works of the power station were began in August, 1989, and the rate of progress in civil engineering works as of the end of September, 1990 was 21.3%. The planning of the impervious wall, the geological features at the site, the method of shutting seawater off, the selection of wall materials, the design of the wall body, the investigation of the quantity of spring water, the execution of the construction and execution management, and the confirmation of the effect of the wall are reported. (K.I.)

  12. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  13. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  14. Nuclear power plants. Construction status report, data as of June 30, 1977. Data for decisions

    International Nuclear Information System (INIS)

    1977-07-01

    The report is designed to provide the necessary information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of the 92 plants authorized to engage in construction activities is summarized. This total includes 4 plants with construction exemptions, and 18 plants with Limited Work Authorization Permits

  15. Density and moisture measurements by nuclear method and its application to compaction control in road construction

    International Nuclear Information System (INIS)

    Mohd Azmi Ismail

    1994-01-01

    The application of nuclear technique in civil engineering sector which emphasises on the in-situ density and moisture measurements of soil in road construction is discussed. The nuclear density-moisture gauge utilises both gamma-rays and neutrons for the determination of the density and moisture content, respectively. The knowledge on the density and moisture content will be used to evaluate the degree of compaction of the compacted layers. The technique offers not only a fast and non-destructive measurement but it is also accurate, economical and repeatable. A calibration equation which is stored in the built-in microprocessor is applicable for any type of soil. Corrections for the interferences from needless gamma-rays produced as a result of thermal neutrons interaction with certain nuclei for the density measurement and effects of hydrogen other than absorbed water for the moisture measurement are considered in the equation. This paper describes briefly the theory and the characteristics of the nuclear gauge and its application in road construction work

  16. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  17. Engineer, procure, construct (EPC) for nuclear projects in OPG

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, M. [Ontario Power Generation, Toronto, Ontario (Canada)

    2011-07-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  18. Engineer, procure, construct (EPC) for nuclear projects in OPG

    International Nuclear Information System (INIS)

    Elliott, M.

    2011-01-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  19. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung

    2014-01-01

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently

  20. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2014-05-15

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently.

  1. Application of large-scaled pre-cast components for the construction of water intake for a nuclear power plant

    International Nuclear Information System (INIS)

    Topolnicki, M.

    1976-01-01

    Problem of the construction of water intake for a 4000 MW nuclear power plant located at the seashore is solved. The advantages of application of large-size pre-cast components are presented,. The constructional solutions and proposed technologies are described in detail. (A.S.)

  2. Improving quality and the assurance of quality in the design and construction of nuclear power plants: a report to Congress

    International Nuclear Information System (INIS)

    Altman, W.; Ankrum, T.; Brach, W.

    1984-05-01

    A study was conducted of existing and alternative programs for improving quality and the assurance of quality in the design and construction of commercial nuclear power plants. A primary focus of the study was to determine the underlying causes of major quality-related problems in the construction of some nuclear power plants and the untimely detection and correction of these problems. The study concluded that the root cause for major quality-related problems was the failure or inability of some utility managements to effectively implement a management system that ensured adequate control over all aspects of the project. These management shortcoming arose in part from inexperience on the part of some project teams in the construction of nuclear power plants. NRC's past licensing and inspection practices did not adequately screen construction permit applicants for overall capability to manage or provide effective management oversight over the construction project. The study recommends a number of improvements in industry and NRC programs. For industry, the study recommends self-imposed rising standards of excellence, treatment of quality assurance as a management tool, not a substitute for management, improved trend analysis and identification of root causes of quality problems, and a program of comprehensive third party audits of present and future construction projects. To improve NRC programs, the study recommends a heavier emphasis on team inspections and resident inspectors, an enhanced review of new applicant's capabilities to construct commercial nuclear power plants, more attention to management issues, improved diagnostic and trending capabilities, improved quality and quality assurance for operating reactors, and development of guidance to facilitate the prioritization of quality assurance measures commensurate with the importance of plant structures, systems, and components to the achievement of safety

  3. 2008 annual meeting on nuclear technology: topical sessions. Pt. 2. Construction of the final repository KONRAD

    International Nuclear Information System (INIS)

    Broeskamp, H.

    2008-01-01

    Summary report by Dipl.-Ing. Holger Broeskamp on the Topical Session ''Constructing the Final Repository KONRAD'' of the Annual Conference on Nuclear Technology held in Hamburg, May 27-29, 2008. (orig.)

  4. Risks and challenges associated with the design and construction of a nuclear power plant; Control de riesgos y retos asociados al diseno y construccion de una central nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Liebana Martinez, B.; Armas Garcia, A.; Martinez Gozalo, I.

    2011-07-01

    The construction of a nuclear power plant project, considering the period prior to the operation of the plant, requires a very strict risk control to ensure compliance with a series of challenges. The present paper identifying the most important challenges facing the construct ability and license requirements of the process, identifying the interfaces and proposing a methodology of construction to meet the challenge of a construction process in 5 years.

  5. Investigation of pressure transients in nuclear filtration systems: construction details of a large shock tube

    International Nuclear Information System (INIS)

    Smith, P.R.; Gregory, W.S.

    1980-04-01

    This report documents the construction of a 0.914-m (36-in.)-dia. shock tube on the New Mexico State University caompus. Highly variable low-grade explosions can be simulated with the shock tube. We plan to investigate the response of nuclear facility ventilation system components to low-grade explosions. Components of particular interest are high-capacity, high efficiency paticulate air (HEPA) filters. Shock tube construction details, operating principles, firing sequence, and preliminary results are reported

  6. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-01-01

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups

  7. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    Energy Technology Data Exchange (ETDEWEB)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-11-26

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups.

  8. Nuclear power plants: data for decisions. Construction status report: data as of July 31, 1977

    International Nuclear Information System (INIS)

    1977-08-01

    This management report is designed to provide the necessary information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of the 91 plants authorized to engage in construction activities in Regions I thru V is summarized in this document. This total includes (4) plants with construction exemptions, and (10) plants with Limited Work Authorization Permits

  9. Experience in construction of a spent nuclear fuel reprocessing plant in Japan

    International Nuclear Information System (INIS)

    Hashimoto, K.; Sakuma, A.; Inoue, K.

    1977-01-01

    In June 1970, Japan Gasoline Co., Ltd (JGC)and Saint-Goblan Techniques Nouvelles of France received an order for the construction of a reprocessing plant from Power Reactor and Nuclear Fuel Development Corporation, as a joint prime contractor. JGC was responsible for: procurement, inspection, and schedule control of equipment and materials other than those imported from Europe; for conclusion of contracts with various subcontractors relating to the building construction, piping, and similar work; and for supervision of field work. Field work began in June 1971 and was completed in about 40 months. This paper describes the experiences of JGC during the period of the entire operation, and on the basis of this experience recommends modifications to their approach to similar projects in the future

  10. Practical experience and problems in the inspection work during construction of nuclear power plants

    International Nuclear Information System (INIS)

    Jansson, E.

    1977-01-01

    Some problems in organizing the regulatory staff in relation to a growing nuclear program are mentioned. Some experiences and problems from the inspection activities during the construction phase are given. Quality assurance and the extent and importance of control and inspection by use of a ''third party'' system is discussed. (author)

  11. The effect of economic growth, oil prices, and the benefits of reactor standardization: Duration of nuclear power plant construction revisited

    International Nuclear Information System (INIS)

    Csereklyei, Zsuzsanna; Thurner, Paul W.; Bauer, Alexander; Küchenhoff, Helmut

    2016-01-01

    The profitability of nuclear power plant investment is largely determined by the construction duration, which directly impacts discounted cash flows, debt and interest payments, as well as variable costs, such as labor. This paper analyzes the key drivers of construction duration using survival models. We focus especially on the strategic expectation formation of private and public utilities engaging in such highly risky megaprojects. Using a balanced dataset of explanatory variables and the IAEA/PRIS dataset of reactor construction starts between 1950 and 2013 we find that the expectation of rising oil prices and higher economic growth, along with the higher per capita GDP of a country tend to reduce the time needed to grid connection. We also identify the reactor models with the fastest construction duration. - Highlights: • We find that higher future economic growth speeds up nuclear reactor construction. • Higher national capacity (measured by income per capita) results in faster projects. • Higher oil prices during construction lead to faster construction times. • Reactor standardization may result in faster building times.

  12. French codes and standards for design, construction and in-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Hugot, G.; Grandemange, J. M.

    1995-01-01

    In 1970, France decided that its future power plants would be of the Pressurized Water Reactor type. This choice proved to be successful since it resulted in more than 60 PWR units in operation or under construction in France and abroad. At the beginning of such a program, the French engineering and manufacturing industry, the national electrical utility and the Safety Authorities had to face the many challenges imposed by the implementation of an imported technology. The government reorganised the licensing process. FRAMATOME, the NSSS vendor, and EDF (Electricite de France), the national utility, decided to create 'AFCEN', the French Association for Design and Construction Rules for Nuclear Island Components. These rules, the RCC's (Regles de Construction et de conception), which are approved by French Safety Authorities deal with mechanical and electrical equipment as well as with nuclear fuel and civil works. They are now being supplemented by in service inspection rules, the RSE's (Regles d'inspection en Service). The paper presents these Codes and their main updating following experience of application, technical progress and evolution of standards. Status of discussion concerning reference to European standardisation and developments of rules applicable to the EPR project will also be discussed

  13. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  14. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  15. Design and construction rules for electrical equipments of nuclear islands. 3. ed.

    International Nuclear Information System (INIS)

    1993-01-01

    The French design and construction for electrical equipments of nuclear islands (RCC-E) deals with equipments of which the failure may have consequences on the safety of persons or appreciable effects on the availability of the power plant. This book presents the rules concerning (1) qualification procedure, (2) the design of functional units, (3) the installation (environmental conditions, protection rules), (4) the constituent elements of equipments, (5) the control and testing methods

  16. Design, construction and testing of replacement nuclear coolant pump stators to meet today's equipment reliability expectations

    International Nuclear Information System (INIS)

    Fostier, L.; Howell, D.

    2005-01-01

    The reliability expectations of equipment and components in today's nuclear power plant are much greater than three or more decades ago when nuclear plants were first constructed due to economic impact of a failure. Very few components in a pressurized water reactor plant can have as much impact of the plants capacity factor as a catastrophic failure of a reactor coolant pump winding. This paper describes the maintenance approach taken by one North American utility in attempt to preclude such failures. The paper will discuss the challenges of the reactor coolant pump application and the enhancements made in the winding design and construction by the supplier to address failure mechanisms so as to better meet present reliability expectations in accordance with dedicated specifications. The paper will also present the in-process and final testing requirements and limits imposed in an attempt to ensure quality of the machine windings, along with selected test results from the stators that have been designed and constructed to these specifications to date. (author)

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  18. Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation – Challenges for a New Regulatory Body

    International Nuclear Information System (INIS)

    Viktorsson, C.

    2016-01-01

    Following an introduction with a description of the peaceful nuclear energy program in the United Arab Emirates (UAE) and an overview of the regulatory framework for safety, security and safeguards, this paper describes the regulatory approach for oversight of construction and the granting of an Operating Licence for the first nuclear power plant in the UAE. The paper describes the inspection programme set up by the Federal Authority for Nuclear Regulation (FANR) to verify construction and preoperational testing by the licensee. Moreover, it outlines the content of the operating licence application and focus areas for the regulatory review and assessment. Also, the paper describes the basic elements required by FANR for the decision-making regarding the issuance of the Operating Licence including integration of the results of review and assessment and the implementation of a systematic inspection programme to ensure operational readiness to operate and maintain the plant in accordance with FANR regulations. Finally, the paper addresses the preparation for regulatory oversight and the skill-set needed at FANR to ensure an effective and efficient oversight of safety, security of the nuclear energy power in the UAE. (author)

  19. Financial qualifications review of applicants for nuclear power plant construction permits

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; Mullen, M.F.; Carr, D.B.

    1988-09-01

    The NRC and its predecessor the AEC have had a regulatory requirement since 1956 that utilities seeking a construction permit for a nuclear power plant be financially qualified to construct and operate the plant. Several amendments to the requirements were made over the years including an attempt in 1982 to drop financial qualification review for electric utilities. This attempt was subsequently found invalid by a federal court. Nevertheless, financial qualification reviews consume significant amounts of NRC staff time and time at Atomic Safety and Licensing Board hearings. The analysis reported in this study was conducted to determine whether there is any empirical evidence of a relationship between a utility's financial health at the time of its construction permits application and the subsequent safety performance of the operating plant. The principal financial measures used to test for this relationship were bond rating, interest coverage ratio, debt/asset ratio, debt/equity ratio, and rate of return on equity. The principal safety measure was the long-term average of the scores assigned the utility in four key areas by the NRC under the Systematic Assessment of Licensee Performance program. The results of the analysis showed no evidence of a relationship between financial health at the time of the construction permit and subsequent safety performance. 7 refs., 16 figs., 4 tabs

  20. Childhood leukaemia and non-Hodgkin's lymphoma near large rural construction sites, with a comparison with Sellafield nuclear site

    International Nuclear Information System (INIS)

    Kinlen, L.J.; Dickson, M.; Stiller, C.A.

    1995-01-01

    The objective was to determine whether population mixing produced by large, non-nuclear construction projects in rural areas is associated with an increase in childhood leukaemia and non-Hodgkin's lymphoma. A study was undertaken of the incidence of leukaemia and non-Hodgkin's lymphoma among children living near large construction projects in Britain since 1945, situated more than 20 km from a population centre, involving a workforce of more than 1000, and built over three or more calendar years. A 37% excess of leukaemia and non-Hodgkin's lymphoma at 0-14 years of age was recorded during construction and the following calendar year. The excesses were greater at times when construction workers and operating staff overlapped (72%), particularly in areas of relatively high social class. For several sites the excesses were similar to or greater than that near the nuclear site of Sellafield (67%), which is distinctive in its large workforce with many construction workers. Seascale, near Sellafield, with a ninefold increase had an unusually high proportion of residents in social class I. The findings support the infection hypothesis and reinforce the view that the excess of childhood leukaemia and non-Hodgkin's lymphoma near Sellafield has a similar explanation. (author)

  1. Fire protection programme during construction of the Chashma nuclear power plant

    International Nuclear Information System (INIS)

    Mian Umer, M.

    1998-01-01

    A clear view is given of several measures that have been taken with regard to fire prevention, protection and fire fighting during all phases of the construction, installation and commissioning of the Chasma nuclear power plant to protect personnel and equipment so that any delays in plant operation as a result of fire incident can be avoided. These measures include the precautions taken, the provisions made for fire extinguishers and hydrants, and the setting up of a fire brigade. An overview is also given of the fire incidents that have occurred. (author)

  2. A cost summary applicable to seismic construction and maintenance of nuclear safety related piping

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-01-01

    This paper presents a summary of costs applicable to nuclear power plant piping for an earthquake defined as 0.2 SSE-PGA as a function of three eras of initial construction: 1967--1974, 1974--1981 and 1981--1990. Costs have been presented for both new construction and maintenance in operating plants using both the original PSAR-FSAR design criteria and current SRP requirements. It is recommended that the cost information contained in this report be considered in evaluating the cost benefit relationships associated with current and proposed future changes in seismic design procedures applicable to safety-related piping systems

  3. The political construction of the nuclear energy issue and its impact on the mobilization of anti-nuclear movements in Western Europe

    International Nuclear Information System (INIS)

    Koopmans, R.; Duyvendak, J.W.

    1994-01-01

    This paper investigates the relation between objective conditions and grievances on the one hand, and the construction of the nuclear energy 'problem' and the mobilization of anti-nuclear movements in Western Europe, on the other. Using data on protest reactions to the Chernobyl disaster in Germany, France, the Netherlands, and Switzerland, we first discuss the effects of so-called 'suddenly imposed grievances'. We then turn to the frame alignment model, which emphasizes the importance of processes of definition and interpretation for the mobilization of social movements, and confront this model with data on public attitudes towards nuclear energy and anti-nuclear movement mobilization in Western Europe. Our analysis indicates that objective conditions as such have little explanatory power, and that similar events and conditions have led to widely diverging interpretations and levels of anti-nuclear mobilization in different countries. We find that the differential success of the interpretative efforts of anti-nuclear movements does neither depend on the nature of the discursive struggle itself, nor on the evidential base for the anti-nuclear movement's claims. Our data show that the movements' political opportunities, and the resulting cross-national variations in the degree to which anti-nuclear movements have been able to block or slow down the expansion of nuclear energy, have been crucial determinants both of the movements' impacts on public opinion, and of the movements' levels of mobilization. We therefore conclude that a combination of the political opportunity and framing perspectives is most fruitful in making sense of the differential careers of the nuclear energy conflict in Western Europe. (orig.) [de

  4. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  5. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    You, Y. M. [PHILOSOPHIA, Inc., Seoul (Korea, Republic of); Suh, K. Y. [Seoul National Univ., Seoul (Korea, Republic of)

    2009-10-15

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4{sup +}D) Technology{sup TM} resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4{sup +}D Technology{sup TM} in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4{sup +}D Technology{sup TM} anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4{sup +}D Technology{sup TM} lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space.

  6. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    You, Y. M.; Suh, K. Y.

    2009-01-01

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4 + D) Technology TM resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4 + D Technology TM in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4 + D Technology TM anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4 + D Technology TM lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space

  7. Use of virtual environments to reduce the construction costs of the next generation nuclear power reactors

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.

    2007-01-01

    The near term deployment of the next generation of reactors will only be successful if they are built on time and without the costly overruns experienced in the previous generation. One critical factor in achieving these goals is to ensure the design is optimized for constructability. In this work the authors explored the effectiveness of full-scale virtual reality simulation in the optimization of the design and construction of the next generation of nuclear reactors. The research tested the suitability of immersive virtual reality display technology in aiding engineers in evaluating potential cost reductions that can be realized by the optimization of design and installation and construction sequences. The intent of this research is to see if this type of technology can be used in capacities similar to those currently filled by full-scale physical mockups and desktop simulations. Using a fully-immersive five sided virtual reality system, known as a CAVE, the authors constructed a series of virtual mockups that represented two next generation nuclear power plants, the Westinghouse AP-1000 and the Pebble Bed Modular Reactor (PBMR). These virtual mockups were then tested as a design tool to help locate and correct problem areas, to optimize the construction sequence, and to assist with familiarizing trades people with the performance of maintenance activities. A series of experiments were performed to assess the usefulness of these virtual mockups in accomplishing these tasks. (authors)

  8. Public acceptance of constructing coastal/inland nuclear power plants in post-Fukushima China

    International Nuclear Information System (INIS)

    Wu, Yican

    2017-01-01

    Risk perception and public involvement have become more and more important in post-Fukushima accident era. A survey had been carried out about public acceptance of constructing coastal/inland Nuclear Power Plants (NPPs) in China. We examined impact factors of public acceptance of nuclear energy and also carried out a comparison between China and OECD. The study revealed that the public still took relatively optimistic attitude although there was a slight decrease just after Fukushima and the public's confidence recovered four years later. The ratio of inland NPPs opponents reached to quite a high level and “not-in-my-back-yard” still reflected an obvious syndrome. We also found public acceptance is mainly affected by benefit and, to a lesser extent, by knowledge, education and age. Moreover, the study suggested government is still a creditable information resource due to its authority but most of respondents felt little or no well-informed about nuclear safety, which means a significant communication gap exists between government and the public. As China is the most ambitious country to develop nuclear energy, it is proposed to introduce a transparent and open system of third-party evaluation, which mainly consists of scientists and non-profit research institutions, to ensure the healthy and sustainable development of nuclear energy. - Highlights: • The public are more optimistic about nuclear energy in China than in OECD. • The ratio of inland nuclear power plants opponents reaches to quite a high level. • Government is still a creditable information resource due to its authority. • Third-party evaluation is proposed to intervene in nuclear safety supervision.

  9. Social and legal aspects of preparing the construction and operation of a nuclear power source

    International Nuclear Information System (INIS)

    Curin, K.

    1989-01-01

    The main activities are described involved in creating territorial, technical and economic conditions for the building of nuclear power plants. The basic precondition is the prognostic evaluation of national requirements for power in each planning time stage. From this proceeds the need of a range of power sources with a definition of their types and their incorporation in the power system and of possible power supply to the district heating system. As for nuclear power plants the building should be divided into three stages: from planning investments to the issuance of an investment intent, the stage of construction and that of operation. A detailed description is presented of the activities of all participants in building nuclear power plants in Czechoslovak conditions. Attention is devoted to the aspects of reliability and safety of nuclear power plants and to the effect of the respective activities on reliability and safety. (Z.M.). 1 tab

  10. On a new approach to the creation of construction materials of nuclear reactions

    International Nuclear Information System (INIS)

    Kolotushkin, V.P.; Parfenov, A.A.

    2012-01-01

    The acceleration of the recombination of vacancies and interstitial atoms upon neutron irradiation is a decisive factor of an increase in the radiation resistance of construction materials of nuclear reactors. The highest efficiency of the implementation of these processes is achieved when distortions appearing under the synergetic action of neutron radiation and short-range ordering of the crystal lattice are used as traps of vacancies and interstitial atoms [ru

  11. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction; El proyecto de construccion de la central nuclear de Flamanville 3. La participacion de Iberdrola Ingenieria y Construccion

    Energy Technology Data Exchange (ETDEWEB)

    Diaz Prada, J. I.; Cubian, B.

    2014-10-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  12. Feasibility study on floating nuclear power plant (1). Conceptual design study of FNPP. Construct research

    Energy Technology Data Exchange (ETDEWEB)

    Yabuuchi, Noriaki; Shimazaki, Junya; Ochiai, Masaaki [Department of Nuclear Energy System, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai, Ibaraki (Japan); Takahashi, Masao [Niigata Engineering Co. Ltd., Tokyo (Japan); Nakazawa, Toshio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Sato, Kazuo [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan)

    2001-02-01

    Offshore siting methods for a nuclear power plant are classified into three types as a floating type, a settled type and a land reclamation type. The floating nuclear power plant (FNPP) has a number of advantages, such as seismic isolation, standardization of design and manufacturing, and reduction of construction period. It is, however, required for FNPP to establish the safety standards, which are different from ones for land based nuclear power plant. Investigations for this subject have not been conducted sufficiently. In this report, design study on a concept for FNPP and a review on stability evaluation for the floating platform, which were performed in order to study the safety concept of the FNPP are described. The basic concept of the FNPP are described. The basic concept for FNPP is as follows: The FNPP is sited approximately 1 - 2km off the sea coast on the open sea with water depth of about 20m and it is moored of protected sea by the breakwater, it provide a floating platform for a 1,100MWe class PWR plant. The results of design study show that the floating platform for 1,100MWe class PWR plant of 300m (L) x 80m (W) x 35m (H), and displacement of approximately 300,000 ton can be constructed in a dockyard. This floating platform guarded by the breakwater is found to be stable enough to install the nuclear power plant from the analysis simulating the movement of the platform due to sea wave or wind. (author)

  13. Construction and engineering report for advanced nuclear fuel development facility

    International Nuclear Information System (INIS)

    Cho, S. W.; Park, J. S.; Kwon, S.J.; Lee, K. W.; Kim, I. J.; Yu, C. H.

    2003-09-01

    The design and construction of the fuel technology development facility was aimed to accommodate general nuclear fuel research and development for the HANARO fuel fabrication and advanced fuel researches. 1. Building size and room function 1) Building total area : approx. 3,618m 2 , basement 1st floor, ground 3th floor 2) Room function : basement floor(machine room, electrical room, radioactive waste tank room), 1st floor(research reactor fuel fabrication facility, pyroprocess lab., metal fuel lab., nondestructive lab., pellet processing lab., access control room, sintering lab., etc), 2nd floor(thermal properties measurement lab., pellet characterization lab., powder analysis lab., microstructure analysis lab., etc), 3rd floor(AHU and ACU Room) 2. Special facility equipment 1) Environmental pollution protection equipment : ACU(2sets), 2) Emergency operating system : diesel generator(1set), 3) Nuclear material handle, storage and transport system : overhead crane(3sets), monorail hoist(1set), jib crane(2sets), tank(1set) 4) Air conditioning unit facility : AHU(3sets), packaged air conditioning unit(5sets), 5) Automatic control system and fire protection system : central control equipment(1set), lon device(1set), fire hose cabinet(3sets), fire pump(3sets) etc

  14. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models

  15. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models.

  16. Case study of the effects of public safety regulation on the construction costs of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.D.

    1987-01-01

    Regulations intended to reduce the number of accidents at nuclear plants and the discharge of sulfur and particulate wastes at coal-fired power plants have become an important cause of construction cost escalation. Measuring the costs of these regulatory interventions is a difficult research task. The three-unit Bruce Mansfield coal-fired plant and the two-unit Beaver Valley nuclear power station located in Shippingport, Pennsylvania, provide a unique opportunity for a case study of the costs of regulation in the construction of both kinds of plants. The units of each plant were built sequentially over a period of intensifying regulation. The method used to measure the costs of public safety regulation in the construction of each kind of plant is to determine the connections between the issuances of the regulatory agencies (EPA and NRC) and cost escalations of succeeding units. The small cost escalations of the Mansfield 3 unit, in comparison to the massive costs of the Beaver Valley 2 unit, suggest that the design and construction of new coal-fired plants are not disrupted by regulatory interventions nearly as extensively as are nuclear units. Certain technical features of Beaver Valley 2, especially its small size and a design that is identical to the first unit's, further contribute to its cost escalations

  17. Nuclear power plant construction and financial assistance - as regards subsidies for promotion of power plant siting

    International Nuclear Information System (INIS)

    Shindo, M.

    1983-01-01

    This paper describes the institutional framework for the granting of subsidies in particular to promote nuclear power plant construction in Japan. It also analyses the technical criteria applied and lists the type of improvements to various facilities and equipment made with such subsidies. (NEA) [fr

  18. NET IBK Computer code package for the needs of planning, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Matausek, M V; Kocic, A; Marinkovic, N; Milosevic, M; Stancic, V [Boris Kidric Institute of nuclear sciences Vinca, Belgrade (Yugoslavia)

    1978-07-01

    Within the Nuclear Engineering Laboratory of the Boris Kidric Institute of Nuclear Sciences (NET IBK) a systematic work has been performed on collecting nuclear data for reactor calculation needs, on developing own methods and computing programs for reactor calculations, as well as on adapting and applying the foreign methods and codes. In this way a complete library of computer programs was formed for precise prediction of nuclear fuel burnup and depletion, for evaluation of the Power distribution variations with irradiation, for computing the amount of produced plutonium and its number densities etc. Programs for evaluation of location of different types of safety and economic analysis have been developed as well. The aim of this paper is to present our abilities to perform complex computations needed for planning, constructing and operating the nuclear power plants, by describing the NET IBK computer programs package. (author)

  19. Environmental studies in conjunction with the construction of nuclear power plants Pt. 2

    International Nuclear Information System (INIS)

    Horvath, L.G.; Bede, G.; Gacs, I.

    1980-01-01

    A status-of-the-art report is presented to summarize the studies in progress in Hungary concerning the radionuclide release of nuclear power plants and the motion and migration of radionuclides in the atmosphere. The presently available computerized models are described, their objectives, performances and advantages are discussed. Some examples are given to illustrate the applicability of the various models. They will be adapted to the local environmental, meteorological and architectural conditions of the Paks nuclear power plant under construction. The cooperation of research groups participating in the development or adaption of the different computerized models will continue during the start-up and operation of the Paks-1 reactor and the models will be improved on the basis of field experiences. New models will also be developed. (D.Gy.)

  20. Engineering and training simulators: A combined approach for nuclear plant construction projects

    International Nuclear Information System (INIS)

    Harnois, Olivier; Gain, Pascal; Bartak, Jan; Gathmann, Ralf

    2007-01-01

    Full text: Simulation technologies have always been widely used on nuclear applications, but with a clear division between engineering application, using highly validated code run in batch mode, and training purpose where real time computation is a mandatory requirement. Thanks to the flexibility of modern simulation technology and the increased performance of computers, it becomes now possible to develop Nuclear Power plant simulators that can be used both for engineering and training purposes. In the last years, the revival of nuclear industry raised a number of new construction or plant finishing projects in which the application of this combined approach would result in decisive improvement on plant construction lead times, better project control and cost optimizations. The simulator development is to be executed in a step-wise approach, scheduled in parallel with the plant design and construction phases. During a first step, the simulator will model the plant nuclear island systems plus the corresponding instrumentation and control, specific malfunctions and local commands. It can then be used for engineering activities defining and validating the plant operating strategies in case of incidents or accidents. The Simulator executive Station and Operator Station will be in prototype version with an interface imagery enabling monitoring and control of the simulator. Availability of such simulation platform leads to a significant increase in efficiency of the engineering works, the possibility to validate basic design hypotheses and detect defects and conflicts early. The second phase will consist in the fully detailed simulation of Main Control Room plant supervision and control MMI, taking into account I and C control loops detailed design improvement, while having sufficient fidelity in order to be suitable for the future operator training. Its use will enable the engineering units not only to specify and validate normal, incident and accident detailed plant

  1. Comparative analysis of structural concrete Quality Assurance practices on nine nuclear and three fossil fuel power plant construction projects. Final summary report

    International Nuclear Information System (INIS)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.J. Jr.

    1978-12-01

    A summary of two reports, COO/4120-1 and COO/4120-2, is given. A comparative analysis was made of the Quality Assurance practices related to the structural concrete phase on nine nuclear and three fossil fuel power plant projects which are (or have been) under construction in the United States in the past ten years. For the nuclear projects the analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. For the fossil projects the analysis identified the response of each Quality Assurance program to criteria similar to those which were applicable in the nuclear situation. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects

  2. Nuclear power plants in Europe 1996. Report on operation, construction and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Eighteen European countries operate and build, respectively, nuclear power plants in 1996. The 'Nuclear Power Plants in Europe 1996' atw report singles out the main events and lines of development. As per August 1996, 216 (1995: 215) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 177,916 (177,010) MWe installed gross capacity are in operation and 24 (26) units with 23,086 (24,786) MWe are under construction in seven countries. This adds up to a total of 240 (241) nuclear generating units with an aggregate 201,002 (201,796) MWe. In the nuclear power plants in Europe, some 1067 (1048) TWh of nuclear power was converted into electric power in 1995; 802 (792) TWh of this aggregate was converted in 142 (137) units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 36%. Lithuania, with 86 (77)% has the highest share of nuclear power in Europe, followed by France with 76 (75)% and Belgium with 56%. The lowest percentage, only 4 (5)%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power are operated, such as Italy or Austria. (orig.) [de

  3. Participation of SKODA JS in the construction of the Temelin and Mochovce nuclear power plants

    International Nuclear Information System (INIS)

    Svec, A.; Zach, J.; Ruzicka, P.

    2000-01-01

    SKODA JS is the traditional manufacturer of WWER type reactor equipment and also supplier of the primary circuits and of equipment for the transport, refuelling and storage of fuel for Ver type nuclear power plants built in the Czech and Slovak Republics. The paper deals with activities of the company SKODA JS at two power plants whose reactor units are close to completion, viz. the Mochovce NPP in the Slovak Republic (4 x Ver 440 MW; unit 1 was put in operation in 1998, unit 2 is in the stage of commissioning, units 3 and 4 are not to be completed) and the Temelin NPP in the Czech Republic (2 x Ver 1000 MW, commissioning of units 1 and 2 is expected in 2001 and 2002, respectively). The scope of supplies to the two nuclear power plants (detailed design, delivery of equipment, installation, commissioning) and the course of construction from SKODA JS's viewpoint are described. The most important design changes and improvements made during the construction are highlighted. (author)

  4. The legal position of the operator and the constructor as regards construction of a nuclear power plant

    International Nuclear Information System (INIS)

    Sartorelli, Claudio

    1976-01-01

    Implementation of the Italian nuclear power programme requires that ENEL (the Italian State Electricity Agency) should solve a series of problems which are not only political, technical and financial, but also legal. The latter include the different positions held by constructors and operators in the nuclear law field. Although the operator must necessarily entrust construction work by contract to specialized agencies, the constructor as a person proper is completely ignored by the legislation in force, while the operator, as the holder of the construction licence is responsible with regard to all the provisions concerning controls, tests, inspections, etc. In recent years ENEL has frequently concluded ''turnkey'' contracts, but in future, given the desirability of diversifying the orders, ENEL may adopt a different policy, and negotiate different contracts with the suppliers of various components. (N.E.A.)

  5. Delay consequencies in the construction time-schedule of nuclear power plants in relation to its safety and quality

    International Nuclear Information System (INIS)

    Recalde, J.A.

    1991-01-01

    An important delay in the construction time-schedule of a Nuclear Power Plant affects its safety and quality. This mainly occurs as a consequence of four reasons: discontinuity of the personnel working for the project; discontinuities of project suppliers; new safety and quality concepts; long-term storage. This work analyses each of the above reasons so as to foresee countermeasures to garantee the non deterioration of a Nuclear Power Plant. (author)

  6. An economic analysis of the effects of regulatory delay on nuclear power plant construction. Technical report

    International Nuclear Information System (INIS)

    Maloney, M.T.; Walsh, M.D.

    1980-08-01

    In order to evaluate the impact that any government regulation has on society, an accurate measure of the costs imposed by the regulation is essential. Current government estimates of the cost of pollution control legislation have failed to include the costs of project delays that firms may experience when complying with such standards. Clearly, if these delays are the direct result of such legislation their costs should be included for a proper evaluation. The purpose of this report is to define and measure the true impact that construction deals have on the total project costs of a specific industry. The Nuclear Power Industry has been chosen to illustrate the problem. First, the industry is examined in terms of its economic and physical environment. A model is then developed to deal with the costs involved in the construction of a typical nuclear plant. The model is tested by regressing time and cost data of 31 completed plants to determine the impact that unanticipated delays have had on total project costs. These results indicate that such delays would increase the total project costs of a typical 1,000 mw plant by .8 percent per month in the initial stage of the project and 1.1 percent per month after actual construction begins

  7. ABWR construction experience in Japan

    International Nuclear Information System (INIS)

    Kawahata, Junichi; Miura, Jun; Saito, Fuyuki; Mori, Hiroya

    2003-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and 7 (K6 and 7) owned by Tokyo Electric Power Company (TEPCO), have been in service since November 1996 and September 1997 respectively, and are the first ABWRs in the world. Hitachi, Ltd. and Toshiba Corporation took part in the projects and achieved safety construction in 52- month schedule from rock inspection to turnover in cooperation with TEPCO and other contractors with broad experience in BWRs. Taking advantage of experience of the Kashiwazaki construction, the ABWR construction methods realize to satisfy with requests from electric power companies and to fit site conditions. The Chubu Electric Power Company's Hamaoka Nuclear Power Station Unit No. 5 (Hamaoka 5) and Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2), which are ABWRs, completed rock inspection in May 2000 and June 2001 respectively, and are under construction. The ABWR construction methods are proved their validity through four actual construction projects. Safe constructions with the highest quality have been advanced thus further aiming at the introduction of the latest technologies and contributing to reduce plant construction costs and also to shorten schedule. (author)

  8. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  9. Security during the Construction of New Nuclear Power Plants: Technical Basis for Access Authorization and Fitness-For-Duty Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Branch, Kristi M.; Baker, Kathryn A.

    2009-09-01

    A technical letter report to the NRC summarizing the findings of a benchmarking study, literature review, and workshop with experts on current industry standards and expert judgments about needs for security during the construction phase of critical infrastructure facilities in the post-September 11 U.S. context, with a special focus on the construction phase of nuclear power plants and personnel security measures.

  10. First decade: TVA's first ten years of nuclear power plant design and construction experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1978-01-01

    This paper reviews the experience of the Tennessee Valley Authority's design and construction program for nuclear power plants in terms of schedule and capital costs in three separate phases. Phase one recapitulates the status of the nuclear power industry in 1966 and sets forth the assumptions used for estimating capital costs and projecting schedules for the first Tennessee Valley Authority units. Phase two describes what happened to the program in the hectic early 1970s in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next 10-year period. 7 figures, 7 tables

  11. Social and psychological problems of nuclear power: perception of NPP construction and environmental risk

    International Nuclear Information System (INIS)

    Malenchenko, A.F.; Sushko, S.N.; Saltanova, I.V.; Tushin, N.N.; Kozlovskaya, A.V.; Bortnovskij, V.N.; Dorofeeva, S.M.; Gapanovich-Kajdalov, N.V.; Gapanovich-Kajdalova, E.V.

    2013-01-01

    The paper presents the analysis of questioning about perception of nuclear power plant construction in Belarus and about concomitant environmental risk. The opinion poll has been conducted among students of: Department of Environmental Monitoring of the International A. Sakharov Environmental University, Physics Department of Belarus State University, Department of General Hygienic and Environmental Medicine of Gomel State Medical University, Faculty of Mechanical Engineering of Minsk Polytechnic College. (authors)

  12. 1997: Nuclear power plants in Europe. Report on operation, construction and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Eighteen European countries operate and build, respectively, nuclear power plants in 1997. The '1997: Nuclear Power Plants in Europe' atw report singles out the main events and lines of development. As per August 1997, 216 (1996: 216) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 180, 184 (177, 916) MWe installed gross capacity are in operation and 22 (24) units with 20,054 (23,086) MWe are under construction in seven countries. This adds up to a total of 238 (240) nuclear generating units with an aggregate 200,238 (201,002) MWe. In the nuclear power plants in Europe, some 1138 (1067) TWh of nuclear power was converted into electric power in 1996: 806 (802) TWh of this aggregate was converted in 142 (142) units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 35,4 (36,0)%. Lithuania, with 83,4 (85,6)% has the highest share of nuclear power in Europe, followed by France with 77,4 (76,0)% and Belgium with 57,2 (55,5)%. The lowest percentage, only 4,8 (3,8)%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power is operated, such as Italy or Austria. (orig.) [de

  13. Analysis and evaluation of status reports for quality assurance practice in nuclear power plant construction

    International Nuclear Information System (INIS)

    1984-01-01

    The study elaborates the structure and definitions of a general description of quality assurance systems with respect to planning and construction of nuclear power plants and indicates standards concerning the production and adaption of structural components. It is suggested to introduce in the licensing procedure the so-called comprehensive constructional report by an expert. For contractors, tasks and responsibilities of the major companies with regard to quality assurance are expressly stipulated. The study also suggests the inclusion of ARGEN, the elaboration of production and test sequence plans and the introduction of a control and evaluation system for the feedback of experience among companies involved and ARGEN. (DG) [de

  14. Round table: The New Constructions; New Build; IAEA Services Nuclear Power Reactor Technologies Construction and Operation

    International Nuclear Information System (INIS)

    Choho, Tarik; Ward, Tony; Koshy, Thomas; )

    2014-01-01

    The first round-table of Atoms for the Future 2014 focused on the topic of 'The new construction'. Attendees had the opportunity to see Tarik Choho, Chief Commercial Executive Officer at AREVA, Tony Ward, Partner and Head of Power and Utilities at EY, as well as Thomas Koshy, Head of Nuclear Power technology Development Section at the IAEA, share their respective point of view and discuss together. They first started with their own presentation before sitting together at the discussion panel. Tarik Choho explained that there are many opportunities for new builds around the world, and especially in new comer countries. Thomas Koshy brought his expert point of view as an international regulator. He showed that the technology landscape also includes new designs as well as non-electricity generation uses. Those two aspects could bring both opportunities and challenges for licensing. Tony Ward showed how difficult it was to finance such a capitalistically intensive project as a new build, and how one could try to find an electricity retail price which is acceptable for both the general private consumer and the plant operator. All speakers agreed that preparation was core to a nuclear new build project. They also pointed out that every project involves more and more actors, and that it could be challenging to let everyone have the appropriate say

  15. Model of a Nuclear Security Naval Agency for radiation control of the Industrial Complex of of Submarine Construction and Maintenance Ship with Nuclear Propulsion; Modelo de uma Agência Naval de Segurança Nuclear para o controle radiológico do complexo industrial de construção e manutenção do submarino com propulsão nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Lins Junior, Amilton de Sousa

    2017-07-01

    Due to the construction, by Brazilian Navy, of a Submarine Construction and Maintenance Ship with Nuclear Propulsion, where, among other activities, the commissioning and exchange of the fuel elements of the reactor in the future Nuclear Submarine, and of a Naval Base where the Nuclear Submarine and the Conventional Submarines, it is necessary the establishment of a Nuclear Security Naval Agency to monitor activities involving ionizing radiation sources and nuclear materials aimed at the radiological protection of exposed occupationally individuals (IOE), the general public and the environment. It should be noted that nuclear and radioactive material will be present only in a part of the yard called Radiological Complex. Therefore, the development of a structure for the control of the Radiological Complex is fundamental, considering that the future licensing process will be unprecedented in Brazil and will face several difficulties. This work presents a model of a structure for the radiological control of the industrial complex for the construction and maintenance of the submarine with nuclear propulsion, as well as the fundamental concepts of the activities, such as inspection, regulations and authorizations, to be carried out by the various component sectors of the Nuclear Security Naval Agency. (author)

  16. Fire protection requirements of the insurance industry and their impact on nuclear power plant design and construction

    International Nuclear Information System (INIS)

    Deitchman, J.V.; King, W.T. Jr.; Nashman, T.A.

    1976-01-01

    The insurance industry, with its wealth of knowledge and experience in the fire protection area and with preservation of its funds at stake, has always been heavily involved in the fire protection programs of nuclear power plants. Since it was concerned with property preservation in addition to nuclear safety, the insurance industry placed more detailed emphasis on fire protection requirements than did the nuclear regulatory bodies. Since the Browns Ferry fire, however, the insurance industry, the Nuclear Regulatory Commission, the Advisory Committee on Reactor Safeguards and the utilities themselves have re-examined their approaches to fire protection. A more coordinated approach seems to have emerged, which is based largely upon insurance industry specifications and guidelines. The paper briefly summarizes the fire protection requirements of the insurance industry as they apply to nuclear power plants. Some of the ways these requirements affect project planning, plant design, and construction timing are reviewed, as well as some of the more controversial fire protection areas

  17. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  18. Visualization of construction engineering

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun

    2000-01-01

    It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)

  19. Information resources for nuclear power construction

    International Nuclear Information System (INIS)

    Rozin, V.M.

    1987-01-01

    Problems of designing and introduction of data resources (in the form of magnetic carrier data) for the construction of NPP with the WWER-1000 type reactors are considered. It is suggested that the data resources should be supplied to the construction as independent production alongside with preliminary estimation and material resources. It is pointed out that the introduction of the data resource will permit to increase the efficiency of NPP construction management

  20. Japanese experience in nuclear power plant construction

    International Nuclear Information System (INIS)

    Seko, T.

    1989-01-01

    Development of LWR in JAPAN started by introducing LWR from the U.S.A. Since then we have been improving existing technology and promoting domestic technology development based on experiences accumulated in Japan. As a result, recent operating performance has been excellent. As far as construction work is concerned, we also have been making our best efforts to improve the performance of construction work itself, with the cooperation of manufacturers. As for construction work, we have succeeded in improving the quality of construction work, shortening the construction period and reducing construction costs through new technology and Japanese-style work management

  1. New NPP Construction Experience in Finland

    International Nuclear Information System (INIS)

    Alm-Lytz, K.

    2016-01-01

    The paper discusses the experiences of the new nuclear power plant construction projects. The topics include the licensing and regulatory oversight process, completion of the design prior to construction, experience and know-how of the participating organisations, quality management in a nuclear construction project, safety culture aspects in a nuclear construction project, and the role and importance of regulator’s oversight. Finland has recent experience of new nuclear power plant construction, one plant unit being under construction close to commissioning phase and one plant unit in construction license phase. Each nation is solely responsible for the safety of its nuclear installations. Therefore, there are also national practices how nuclear power plants are licensed and how the safety and quality of these plants are verified during construction and operation. Differences in licensing, regulations and regulatory practices may have an impact on the design of the plant. There may be differences in how the detailed design has to be documented and how and when it needs to be submitted for approval to the regulator. To avoid surprises due to differences, it is beneficial for the owner and plant vendor to familiarize themselves early enough on the national practices and regulations to ensure that regulatory expectations and processes can be taken into account in the project implementation. In addition, the owner and the plant vendor have to understand what are the national safety goals and safety requirements that the plant has to fulfil, and what they mean to the detailed design of the plant. These have to be clarified and explicitly defined by the owner in terms of design criteria in the bidding documentation to avoid difficulties in the future steps of the project.

  2. Housekeeping during the construction phase of nuclear power plants - approved 1973

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Housekeeping requirements are presented for the control of work activities, conditions, and environments that can affect the quality of important parts of a nuclear power plant during the construction phase. These parts include the structures, systems, and components whose satisfactory performance is required for the plant to operate reliably, to prevent accidents that cause undue risk to the health and safety of the public, or to mitigate the consequences of such accidents if they were to occur. Housekeeping encompasses all activities related to control of cleanness of facilities, cleanness of material and equipment, fire prevention and fire protection including disposal of combustible materials and debris, control of access, and protection of equipment not denoted in other Standards

  3. Concrete containments in Swedish nuclear power plants. A review of construction and material

    International Nuclear Information System (INIS)

    Roth, Thomas; Silfwerbrand, Johan; Sundquist, Haakan

    2002-12-01

    The purpose of project is the long-term accumulation of knowledge related to the status of existing structures in order to facilitate answers to questions that may arise in the future. We have visited all the power stations in Sweden and in conjunction with these visits we have gone through all the relevant documents relating to the constructional concrete. An assessment of the structural integrity, related to the question of cracking and hence seepage, has been conducted. Currently, the work has only been done on a random sampling basis as in many cases important information is still missing. Generally, it can be said that the relevant constructions are, from a structural integrity point-of-view, correctly designed and detailed and have very high safety margins for the load cases which constitute the functional demands placed upon the installation. Each containment structure (vessel) appears to have been designed and built using the best available knowledge at the time of construction. It may be of interest to note that when these structures were built there was a very high level of competence and experience of how to design, detail, and construct large concrete structures. The cement used for the majority of these large concrete structures forming nuclear power stations, namely a slowly hardening cement (LH cement), had very good properties, perhaps even better than those available today. Later structures were built with other cements and concrete mixes, although this has been partly compensated for by a choice of a higher nominal quality. The environment is favourable regarding potential degradation of the concrete, the reinforcement steel and the steel liner. Questions remain regarding the uncertainties of the methods used for continuous inspection of the cement injected prestressing steel. This is even the case for possibly insufficient injection around grouting mounting parts for manholes and other openings. Assessment of prestressing losses may also require

  4. Nuclear reactor construction with bottom supported reactor vessel

    International Nuclear Information System (INIS)

    Sharbaugh, J.E.

    1987-01-01

    This patent describes an improved liquid metal nuclear reactor construction comprising: (a) a nuclear reactor core having a bottom platform support structure; (b) a reactor vessel for holding a large pool of low pressure liquid metal coolant and housing the core; (c) a containment structure surrounding the reactor vessel and having a sidewall spaced outwardly from the reactor vessel side wall and having a base mat spaced below the reactor vessel bottom end wall; (d) a central small diameter post anchored to the containment structure base mat and extending upwardly to the reactor vessel to axially fix the bottom end wall of the reactor vessel and provide a center column support for the lower end of the reactor core; (e) annular support structure disposed in the reactor vessel on the bottom end wall and extending about the lower end of the core; (f) structural support means disposed between the containment structure base mat and bottom end of the reactor vessel wall and cooperating for supporting the reactor vessel at its bottom end wall on the containment structure base mat to allow the reactor vessel to expand radially but substantially prevent any lateral motions that might be imposed by the occurrence of a seismic event; (g) a bed of insulating material disposed between the containment structure base mat and the bottom end wall of the reactor vessel and uniformly supporting the reactor vessel at its bottom end wall; freely expand radially from the central post as it heats up while providing continuous support thereof; (h) a deck supported upon the wall of the containment vessel above the top open end of the reactor vessel; and (i) extendible and retractable coupling means extending between the deck and the top open end of the reactor vessel and flexibly and sealably interconnecting the reactor vessel at its top end to the deck

  5. Economic and ecological assessment of impact of construction and operation of nuclear power plant as large capital construction project with respect to control of national economy development

    International Nuclear Information System (INIS)

    Bucek, M.

    1984-01-01

    The evaluation of costs and environmental impacts of the construction and operation of nuclear power plants is concentrated into two problem areas: 1. the calculation of capital and operation costs for the prevention and minimization of envirommental damage and restoration of the environment, 2. the calculation of damage to the environment of nuclear power plant construction and operation. The ecological cost benefit of capital costs is assessed. In Czechoslovakia there does not exist any method for converting cost effectiveness of investments into environmental protection. This problem is incorporated in the general method of assessing capital cost benefit. The relations are given for total socio-economic capital cost benefit and cost benefit of investments into environmental protection. Ecological investment is not exempted from the investment fund and from the point of view of content may be devided into net and gross ecological investment and from the point of view of time into preventive and compensation ecological investment. In the USSR the method has beem developed of the ecological and economic evaluation of projects for the construction and reconstruction of production units which proceeds from the evaluation of the negative environmental impact of wastes. The basic relations are given of the benefit of ecological investments. (E.S.)

  6. Assessing the effect of nuclear power installation construction and operation on the socio-economic sphere

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    A demographic analysis is made of the area within 25 km from the Dukovany nuclear power plant. The problem is discussed of sources and requirements for manpower for the construction and operation of the power plant. It was found that the capacity of creches and nursery schools for children of power plant employees is inadequate, as are health care facilities for personnel. (E.S.)

  7. Special issue on start of construction of the Ohma nuclear power plant of J-Power

    International Nuclear Information System (INIS)

    Takahashi, Taizo

    2008-01-01

    The Electric Power Development Co., Ltd. (J-Power) started construction of its Ohma nuclear power plant - a 1383 MWe Advanced Boiling Water Reactor (ABWR) - in Aomori prefecture on May 2008. The reactor of the Ohma plant will be the first to load MOX fuels in all of its reactor cores. It will be able to consume a quarter of all the recycled MOX fuels produced at Rokkasho reprocessing plant and hence make a major contribution to Japan's policy of recycling plutonium recovered from spent fuels. Special issue reviewed history and overview of the Ohma plant as well as its significance to enhance power generation portfolio in corresponding with national interests. Local governor's expectations and present state of the Ohma plant were also described. After preparation works, construction began on excavation of foundation for the service building, proceeding as always with safety the foremost priority during construction. (T. Tanaka)

  8. Nuclear power. Volume 2: nuclear power project management

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables

  9. Construction of a bibliographic information database for the nuclear science and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Kim, Soon Ja; Choi, Kwang [Korea Atomic Energy Reasech Institute, Taejon (Korea)

    1997-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows: (1) Materials selection and collection, (2) Indexing and abstract preparation, (3) Data input and transmission, and (4) document delivery service. In this seventh year, 45000 records, as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. (author). 1 fig., 1 tab.

  10. Development of the radiological protection focus in the site, design and construction of the nuclear power plant in Cuba

    International Nuclear Information System (INIS)

    Rodriguez R, J.M.

    1996-01-01

    The first nuclear station in Cuba NPP Juragua, at present in analysis for starting again the construction, under a multinational economic association, had had as main architect/engineer organization the Design Institute for Nuclear Power Stations of St. Petersburg (former LIAEP). Active participation of Cuban radiation protection specialist of Energoproyecto in the Juragua Project began at the beginning of the site selection works and continued in the design and construction stages up till now, and simultaneously our specialists have been acting as a counterpart of soviet designers, responsible for the general design of the station. Furthermore, some additional works in compliance with the latest safety requirements and the best international practices, which are described, as well as ongoing and planned work were performed. (author). 11 refs., 3 figs

  11. Framework for monitoring the social and economic impacts associated with the construction of the Skagit Nuclear Project in Skagit County, Washington

    International Nuclear Information System (INIS)

    Merwin, D.J.; Greene, M.

    1977-01-01

    The paper discusses an information system which has been developed to monitor the social and economic impacts associated with the construction of twin nuclear reactors in Skagit County, Washington, by Puget Sound Power and Light Company. The monitoring system has been specifically designed to track the social and economic impacts of the Skagit Nuclear Project as they occur

  12. Regulation and construction of nuclear powerplants: South Texas Nuclear Project. Hearing before the Subcommittee on Oversight and Investigations of the Committee on Interstate and Foreign Commerce, House of Representatives, Ninety-sixth Congress, Second Session

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    On September 23, 1980, the Subcommittee of Oversight and Investigation held a congressional hearing to discuss the regulation and construction of the South Texas Nuclear Power Plant project. Discussion included recommendations to prevent problems, like the problem encountered at Three Mile Island, from occurring during construction and operation. The chairman of the Nuclear Regulatory Commission discussed the procedure for inspection and regulation process. One power plant at the South Texas project experienced significant problems because of an inadequate quality assurance and quality control program. These difficulties caused delay in construction, increased cost, and raised questions of safety. The problems encountered at Three Mile Island and at the first plant of the South Texas project provided the reasons for this congressional hearing

  13. Construction of a male sterility system for hybrid rice breeding and seed production using a nuclear male sterility gene

    OpenAIRE

    Chang, Zhenyi; Chen, Zhufeng; Wang, Na; Xie, Gang; Lu, Jiawei; Yan, Wei; Zhou, Junli; Tang, Xiaoyan; Deng, Xing Wang

    2016-01-01

    Nuclear male sterility is common in flowering plants, but its application in hybrid breeding and seed production is limited because of the inability to propagate a pure male sterile line for commercial hybrid seed production. Here, we characterized a rice nuclear gene essential for sporophytic male fertility and constructed a male sterility system that can propagate the pure male sterile seeds on a large scale. This system is fundamentally advantageous over the current cytoplasmic male steril...

  14. Impact of Nuclear Power and Desalination Plant Construction Toward National and East Java Economic

    International Nuclear Information System (INIS)

    Ratya-Anindita; Sriyana; M-Nasrullah

    2006-01-01

    The objective of this study is to determine the economic impacts of the construction of the nuclear power plant 2 x 100 MW(e) SMART type with desalination 4 x 10,000 m 3 which would conduct in years 2008 to 2017 in Madura Island, East Java. The predicted IO tables of 2008-2017 have been created by the application of dynamic IO projection. The economic impact was estimated through multiplier effect which covers direct impact and indirect impact as well as the induced effect. The expenditures of SMART nuclear power and desalination plant to the domestic contractors is estimated to amount to 88.2 million US dollar or 25.6 % of the whole expenditures. The total impact of the project to the national economy would be Rp. 6,329,347 million, Rp. 8,439,130 million, and Rp. 12,658,695 million for each scenario of the exchange rate as high as Rp. 7,500/US dollar, Rp. 10,000/US dollar, Rp. 15,000/US dollar, respectively for the scenario of dynamic growth. The total impact of the project to the provincial economy of East Java would be as much as Rp. 3,253,498 million, Rp. 4,337,997 million, and Rp. 6,506,995 million for each scenario of the exchange rate as high as Rp. 7,500/US dollar, Rp. 10,000/US dollar, Rp. 15,000/US dollar, respectively under the former scenario. Cumulative direct impact since pre-construction to construction period had been calculated as much as US dollar 101.8 million for sectors number 48.52 and 62. This have brought much impact on other sectors in national or provincial levels of economy. (author)

  15. Quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    1975-04-01

    This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants. This guide applies to all types of nuclear power plants. (U.S.)

  16. Nuclear anxiety: a test-construction study

    International Nuclear Information System (INIS)

    Braunstein, A.L.

    1986-01-01

    The Nuclear Anxiety Scale was administered to 263 undergraduate and graduate studies (on eight occasions in December, 1985 and January, 1986). (1) The obtained alpha coefficient was .91. This was significant at the .01 level, and demonstrated that the scale was internally homogeneous and consistent. (2) Item discrimination indices (point biserial correlation coefficients) computered for the thirty (30) items yielded a range of .25 to .64. All coefficients were significant at the .01 level, and all 30 items were retained as demonstrating significant discriminability. (3) The correlation between two administrations of the scale (with a 48-hour interval) was .83. This was significant at the .01 level, and demonstrated test-retest reliability and stability over time. (4) The point-biserial correlation coefficient between scores on the Nuclear Anxiety Scale, and the students' self-report of nuclear anxiety as being either a high or low ranked stressor, was .59. This was significant at the .01 level, and demonstrated concurrent validity. (5) The correlation coefficient between scores on the Nuclear Anxiety Scale and the Spielberger State-Trait Anxiety Inventory, A-Trait, (1970), was .41. This was significant at the .01 level, and demonstrated convergent validity. (6) The correlation coefficient between positively stated and negatively stated items (with scoring reversed) was .76. This was significant at the .01 level, and demonstrated freedom from response set bias

  17. Anchorage of equipment - requirements and verification methods with emphasis on equipment of existing and constructed VVER-type nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.

    1999-01-01

    Criteria and verification methods which are recommended for use in the capacity evaluation of anchorage of safety-related equipment at WWER-type nuclear power plants are presented. Developed in compliance with the relevant basic standards documents specifically for anchorage of WWER-type equipment components, the criteria and methods cover different types of anchor bolts and other anchorage elements which are typical of existing, constructed, or reconstructed WWER-type nuclear power plants

  18. Effect of long construction times on utility financial requirements

    International Nuclear Information System (INIS)

    Francis, J.M.

    1981-01-01

    It is well-known that long construction times significantly increase the cost of an individual nuclear plant. Long construction times, however, are not confined to either a single plant or a single utility. Rather, they apparently occur in almost all nuclear plants currently under construction. The total financial requirement to complete the 82 nuclear plants currently under construction was assessed. The analysis was performed assuming a construction time of ten years in one case, and six years in another. It was found that decreasing the construction time from ten to six years will reduce the financial requirements of the utility industry by $89 billion

  19. Issues related to the construction and operation of a geological disposal facility for nuclear fuel waste in crystalline rock - the Canadian experience

    Energy Technology Data Exchange (ETDEWEB)

    Allan, C.J.; Baumgartner, P.; Ohta, M.M.; Simmons, G.R.; Whitaker, S.H. [Atomic Energy of Canada Ltd., Pinawa, MB (Canada). Whiteshell Labs

    1997-12-31

    This paper covers the overview of the Canadian nuclear fuel waste management program, the general approach to the siting, design, construction, operation and closure of a geological disposal facility, the implementing disposal, and the public involvement in implementing geological disposal of nuclear fuel waste. And two appendices are included. 45 refs., 5 tabs., 10 figs.

  20. Issues related to the construction and operation of a geological disposal facility for nuclear fuel waste in crystalline rock - the Canadian experience

    International Nuclear Information System (INIS)

    Allan, C.J.; Baumgartner, P.; Ohta, M.M.; Simmons, G.R.; Whitaker, S.H.

    1997-01-01

    This paper covers the overview of the Canadian nuclear fuel waste management program, the general approach to the siting, design, construction, operation and closure of a geological disposal facility, the implementing disposal, and the public involvement in implementing geological disposal of nuclear fuel waste. And two appendices are included. 45 refs., 5 tabs., 10 figs

  1. Introduction of characteristics and construction methods for Lungmen NPP

    International Nuclear Information System (INIS)

    Hur, Kyung Phil; Manager, General

    2007-01-01

    Daewoo Engineering and Construction Co., Ltd. has taken part in the construction of ABWR (Advance Boiling Water Reactor of capacity of 1,350MW) at Lungmen site in Taiwan since 1999 as a member of Joint Company for the Nuclear Island Civil Work and Nuclear Island Equipment and Piping Work. This paper discusses the introduction of NSSS of ABWR and the major construction methods applied to Lungmen Nuclear Power Plants. Even though there is no BWR or ABWR type of Nuclear Power Plants built in Korea, the information and data related to the newly advanced construction technologies which has been already applied successfully is very important for the future overseas expansion

  2. Nuclear watershed

    International Nuclear Information System (INIS)

    Makovich, L.; Parish, T.

    1984-01-01

    In 1979 the accident at Three Mile Island brought nuclear power to the forefront of national attention. Over the last five years there have been no new orders for nuclear plants, construction costs and lead times have increased drastically, and numerous plants have been cancelled. In the coming years many new plants will come on line, and the first round of nuclear plant retirements will begin. Thus, the new set of issues faced by utilities are whether to complete plants currently under construction, how to recover the cost of abandoned plants, how to handle the potential rate shock of bringing costly plants into rate base, and how to accomplish decommissioning and retirement of nuclear plants. This paper presents and analyzes these issues. First, the history of the nuclear electric generation industry is reviewed. Next a case study illustrating the cost momentum built into nuclear power plant construction is presented. The issues involved in plant cancellation are discussed. Finally, a case study involving rate phase-in strategies is analyzed. 1 reference, 7 figures

  3. Technique treatment of early stage support construction system for Gaoling mountain tunnel engineering of Daya Bay nuclear power station

    International Nuclear Information System (INIS)

    Ma Keli

    2010-01-01

    This article studies the technical treatment of primary support system used in Gaoling mountain tunnel construction process at Daya by nuclear power plant in combination with the new austrian tunneling construction method, this article first analyzes the design of primary support system, and the key point of the analyses lies in the primary support technical treatment schemes of Gaoling mountain tunnel with the examples of tunnel collapse and primary support design alteration for bias voltage section, then the construction technology of the primary support system is summarized, and the safety of wall rock is analyzed as well with the measurement data. In the end, suggestions are put forward on the design and construction of primary support system for tunnels on the basis of practical working experience. (author)

  4. Nuclear and training

    International Nuclear Information System (INIS)

    Xiaofeng, T.; Perotin, J.P.; Gavrilovic, M.; Vermot-Desroches, J.P.; Leflefian, Ch.

    2009-01-01

    The present text presents the characteristics of a project of a nuclear power plant construction and the notion of culture of safety and explains the necessity of the implementation of the management team asked to diffuse the culture of nuclear safety and to insure it the control and analyzes the example of the nuclear power plant construction of Ling Ao in China. To complete the different training in nuclear field are reviewed through National education. (N.C.)

  5. No halt to the construction of Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The grounds upon which the judgment of Koblenz Administrative Court (Verwaltungsgericht) of 1-8-1975 - 7 L 14/75 - was based are now available. In this decision, the action of the city of Neuwied for restitution of the action to set aside (motion to stay the immediate execution of) the First Partial License for the construction of the 1,200 MW nuclear power station at Muelheim-Kaerlich was dismissed. The costs of the administrative procedures, including the extra-judicial costs of the persons summoned to appear in court, are imposed upon the applicant. The value in litigation of the procedures following the motion to stay proceedings was fixed at 50,000 DM. The sometimes contradictory grounds of paragraph II are given in full wording and commented upon. (orig./AK) [de

  6. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  7. Construction of a sputtering reactor for the coating and processing of monolithic U-Mo nuclear fuel

    International Nuclear Information System (INIS)

    Schmid, Wolfgang

    2011-01-01

    In the presented thesis sputter deposition was used for the first time to coat monolithic U-Mo nuclear fuel foils with diffusion inhibitive materials. The intention of these coatings is to prevent the formation of an interdiffusion layer between U-Mo and Al cladding during the use of the fuel. A small sputtering reactor was built, in which the method was tested and processing parameters were investigated. In parallel a larger sputtering reactor was constructed, that allows to coat full size monolithic U-Mo nuclear fuel foils and was used to test an industrial application of the technique. As a result a method based on sputter deposition and erosion can be presented, that allows to clean as well as to coat the surface of monolithic U-Mo nuclear fuel foils in excellent quality. It can be included at any time into the manufacturing chain for U-Mo fuel elements, which is currently being developed.

  8. Nuclear power complexes and economic-ecological problems of nuclear power development

    International Nuclear Information System (INIS)

    Dollezhal', N.A.; Bobolovich, V.N.; Emel'yanov, I.Ya.

    1977-01-01

    The effect of constructing NPP's at separate sites in densely populated areas on economic efficiency of nuclear power and its ecological implications has been investigated. Locating NPP's and nuclear fuel cycle plants at different sites results in large scale shipments of fresh and spent nuclear fuels and radioactive wastes. The fact increases the risk of a detrimental environmental impact, duration of the external fuel cycle, and worsens, in the end, nuclear power economics. The prudence of creating nuclear parks is discussed. The parks may be especially efficient if the program of developing NPP's with fast breeder reactors is a success. Comparative evaluations show that from economic standpoint deployment of nuclear parks in the European part of the USSR has no disadvantage before construction of separate NPP's and supporting fuel cycle facilities of equivalent capacity, even if the construction of nuclear parks runs dearer by 30% than assumed. The possibility for nuclear parks to meet a part of demand for ''off-peak'' energy production, district heating and process heat production is also shortly discussed

  9. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  10. Investor's experience with keeping fixed costs during the construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Cecil, P.

    1990-01-01

    The introduction of fixed costs in the construction of the Temelin nuclear power plant should secure stabilization of budget cost and prevent its increase. The differences between the fixed costs method and the procedure used so far are briefly described. The introduction of fixed costs was to be followed by the corresponding legal regulations; however, the legal adjustment has not been carried out in the desired completeness. The reason is the difference in understanding the notion of fixed costs by the investor, the contractor and the designer. Another problem is the difference in the level and the detail of the initial project design and of the Soviet implementation designs. The investor believes that the introduction of fixed costs has not yet met with the desired response by organizations participating in the construction. (J.P.)

  11. Argentine nuclear program

    International Nuclear Information System (INIS)

    Leibovich, H.; Takacs, E.A.

    1983-01-01

    The paper describes Argentina's nuclear program, detailing its objectives, the schedule of construction of nuclear plants and local production of required equipment. The technologies adopted so far, the local industrial and engineering participation, the preliminary study for the construction of the next power station and Argentina's nonproliferation nuclear policy are analyzed. Argentina's point of view on Canadian nonproliferation policy and CANDU reactor export is discussed

  12. Construction of a bibliographic information database and development of retrieval system for research reports in nuclear science and technology (II)

    International Nuclear Information System (INIS)

    Han, Duk Haeng; Kim, Tae Whan; Choi, Kwang; Yoo, An Na; Keum, Jong Yong; Kim, In Kwon

    1996-05-01

    The major goal of this project is to construct a bibliographic information database in nuclear engineering and to develop a prototype retrieval system. To give an easy access to microfiche research report, this project has accomplished the construction of microfiche research reports database and the development of retrieval system. The results of the project are as follows; 1. Microfiche research reports database was constructed by downloading from DOE Energy, NTIS, INIS. 2. The retrieval system was developed in host and web version using access point such as title, abstracts, keyword, report number. 6 tabs., 8 figs., 11 refs. (Author) .new

  13. Construction of a bibliographic information database and development of retrieval system for research reports in nuclear science and technology (II)

    Energy Technology Data Exchange (ETDEWEB)

    Han, Duk Haeng; Kim, Tae Whan; Choi, Kwang; Yoo, An Na; Keum, Jong Yong; Kim, In Kwon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-05-01

    The major goal of this project is to construct a bibliographic information database in nuclear engineering and to develop a prototype retrieval system. To give an easy access to microfiche research report, this project has accomplished the construction of microfiche research reports database and the development of retrieval system. The results of the project are as follows; 1. Microfiche research reports database was constructed by downloading from DOE Energy, NTIS, INIS. 2. The retrieval system was developed in host and web version using access point such as title, abstracts, keyword, report number. 6 tabs., 8 figs., 11 refs. (Author) .new.

  14. Construction of a bibliographic information database for the nuclear science and engineering (X)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Lee, Ji Ho; Oh, Jeong Hun; Choi, Kwang; Chun, Young Chun; Yoo, Jae Bok; Yu, Anna [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks.The contents of this project are as follows: 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this Tenth year, 30,500 records ,as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information . And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. 2 tabs. (Author)

  15. Inspection activities of the Mexican regulatory body during the construction stage of the first unit of Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Salgado Gonzalez, Julio Ricardo

    1996-01-01

    The paper addresses the regulatory framework established for the design, construction and operation of the NPP. The regulatory bases of the inspection program are mentioned.A summary of the inspection and reviewing activities carried out by the former Nuclear Safety Management Construction area during the construction stage, taking the year 1977 as the beginning of regular inspection activities for this construction stage, and up to the year 1987, when this one is considered as practically completed, and a stage of pre-operational tests has been started. Finally, the main inspection areas are described, and a summary is given of the classification of deficiencies detected during the inspections

  16. Nuclear containment systems and in-service inspection status of Korea nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Jihong, Park; Jaekeun, Hong; Banuk, Park [Korea Institute of Machinery and Materials, Dept. of Authorized Test and Evaluation, Kyungnam (Korea, Republic of)

    2007-07-01

    20 unit nuclear power plants in Korea have been operated and maintained since the first unit started in commercial service in 1978. Most recently 4 units were under construction and several units were planned to be constructed. by industries. 4 types of nuclear containment systems have been constructed until now: first, metal containments, then pre-stressed concrete containments with grouted tendon systems, followed by pre-stressed concrete containments with un-grouted tendon systems, and Korea standard nuclear containments. All the nuclear containments should be inspected periodically. Therefore for periodic in-service inspection, several appropriate technical requirements should be applied differently depending on the specific nuclear containment types. With the changes of times, nuclear containment systems have undergone a remarkable change, and finally nuclear containment system of Korea standard nuclear power plant was settled down, and as a matter of course it dominates the trend of present and future nuclear containment systems. Overall in-service inspection results of most Korea nuclear containments have not showed any serious evidence of degradation.

  17. Liquid metal cooled nuclear reactor constructions

    International Nuclear Information System (INIS)

    Aspden, G.J.; Allbeson, K.F.

    1984-01-01

    In a liquid metal cooled nuclear reactor with a nuclear fuel assembly in a coolant-containing primary vessel housed within a concrete containment vault, there is thermal insulation to protect the concrete, the insulation being disposed between vessel and concrete and being hung from metal structure secured to and projecting from the concrete, the insulation consisting of a plurality of adjoining units each unit incorporating a pack of thermal insulating material and defining a contained void co-extensive with said pack and situated between pack and concrete, the void of each unit being connected to the voids of adjoining units so as to form continuous ducting for a fluid coolant. (author)

  18. Experience with construction and assembly of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Prochazka, J.; Stepanek, S.; Drahy, J.

    1981-01-01

    The model is discussed of the constructions of the V-1 nuclear power plant at Jaslovske Bohunice with SKODA Trust fulfilling the role of the general supplier of the secondary part technology and the chief and special assembly contractor. The SKODA Trust mediated the Soviet supplies of technology, Soviet assembly and special assembly, and the mounting of the primary part according to Soviet projects. Plant start-up was safeguarded by the investor through Bohunice power plant staff and Soviet experts. The assembly of the primary circuit and the test assembly of reactor parts are described and the experience gained is discussed. The technological requirements are illustrated by the most important characteristics of the individual parts of the primary circuit. Also described are the design specifications of the 220 MW saturated steam turbine and the experience with its assembly and start-up. (B.S.)

  19. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  20. Economics of nuclear power projects

    International Nuclear Information System (INIS)

    Chu, I.H.

    1985-01-01

    Nuclear power development in Taiwan was initiated in 1956. Now Taipower has five nuclear units in smooth operation, one unit under construction, two units under planning. The relatively short construction period, low construction costs and twin unit approach had led to the significant economical advantage of our nuclear power generation. Moreover betterment programmes have further improved the availability and reliability factors of our nuclear power plants. In Taipower, the generation cost of nuclear power was even less than half of that of oil-fired thermal power in the past years ever since the nuclear power was commissioned. This made Taipower have more earnings and power rates was even dropped down in March 1983. As Taiwan is short of energy sources and nuclear power is so well-demonstrated nuclear power will be logically the best choice for Taipower future projects

  1. Nuclear Safety Regulations

    International Nuclear Information System (INIS)

    Novosel, N.; Prah, M.

    2008-01-01

    Beside new Ordinance on the control of nuclear material and special equipment ('Official Gazette' No. 15/08), from 2006 State Office for Nuclear Safety (SONS) adopted Ordinance on performing nuclear activities ('Official Gazette' No. 74/06) and Ordinance on special requirements which expert organizations must fulfil in order to perform certain activities in the field of nuclear safety ('Official Gazette' No. 74/06), based on Nuclear Safety Act ('Official Gazette' No. 173/03). The Ordinance on performing nuclear activities regulates the procedure of notification of the intent to perform nuclear activities, submitting the application for the issue of a licence to perform nuclear activities, and the procedure for issuing decisions on granting a licence to perform a nuclear activity. The Ordinance also regulates the content of the forms for notification of the intent to perform nuclear activities, as well as of the application for the issue of a licence to perform the nuclear activity and the method of keeping the register of nuclear activities. According to the Nuclear Safety Act, nuclear activities are the production, processing, use, storage, disposal, transport, import, export, possession or other handling of nuclear material or specified equipment. The Ordinance on special requirements which expert organizations must fulfil in order to perform certain activities in the field of nuclear safety regulates these mentioned conditions, whereas compliance is established by a decision passed by the SONS. Special requirements which expert organizations must fulfil in order to perform certain activities in the field of nuclear safety are organizational, technical, technological conditions and established system of quality assurance. In 2007, State Office for Nuclear Safety finalized the text of new Ordinance on conditions for nuclear safety and protection with regard to the siting, design, construction, use and decommissioning of a facility in which a nuclear activity is

  2. Nuclear power: status and outlook

    International Nuclear Information System (INIS)

    Rogner, H.H.; Langlois, L.M.; McDonald, A.

    2002-01-01

    Current state of the world nuclear energetics is reviewed; data on operating and nuclear power blocks under construction in different countries, data on electric power output, practice of operation are presented. New plans of energetic reactors, capitalized costs for their construction, operating cost and period of construction are treated. Problems of nuclear safety, spent fuel and radioactive waste management, non-proliferation policy are discussed. Outlook for the development of the nuclear energetics is directed and importance of the Bonn agreement in connection with economic reasons for NPP operation is noted [ru

  3. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  4. Supplementary quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    This standard sets forth the supplementary quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel for nuclear power plant construction. The requirements may also be extended to other appropriate parts of nuclear power plants when specified in contract documents. This standard is intended to be used in conjunction with ANSI N45.2

  5. 10 CFR 4.128 - New construction.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false New construction. 4.128 Section 4.128 Energy NUCLEAR... 1973, as Amended Discriminatory Practices § 4.128 New construction. (a) Design, construction, and... Federal Accessibility Standards. (1) Effective as of January 18, 1991, design, construction, or alteration...

  6. New Nuclear Safety Regulations

    International Nuclear Information System (INIS)

    Novosel, N.; Prah, M.; Cizmek, A.

    2008-01-01

    Beside new Ordinance on the control of nuclear material and special equipment (Official Gazette No. 15/08), from 2006 State Office for Nuclear Safety (SONS) adopted Ordinance on performing nuclear activities (Official Gazette No. 74/06) and Ordinance on special conditions for individual activities to be performed by expert organizations which perform activities in the area of nuclear safety (Official Gazette No. 74/06), based on Nuclear Safety Act (Official Gazette No. 173/03). The Ordinance on performing nuclear activities regulates the procedure of announcing the intention to perform nuclear activity, submitting an application for the issue of a license to perform nuclear activity, and the procedure for adoption a decision on issuing a nuclear activity license. The Ordinance also regulates the contents of the application form for the announcement of the intention to perform nuclear activity, as well as of the application for the issue of a nuclear activity license and the method of keeping a nuclear activity register. The Ordinance on special conditions for individual activities to be performed by expert organizations which perform activities in the area of nuclear safety regulates these mentioned conditions, whereas compliance is established by a decision passed by the SONS. Special conditions for individual activities to be performed by expert organizations which perform activities in the area of nuclear safety are organizational, technical, technological conditions and established system of quality assurance. In 2007, SONS finalized the text of new Ordinance on nuclear safety and protection conditions for location, design, construction, operation and decommissioning of facility in which nuclear activity is performed. This Ordinance regulates nuclear safety and protection conditions for location, design, construction, operation and decommissioning of facility in which nuclear activity is performed. This Ordinance defines facilities in which nuclear activity is

  7. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

  8. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications

  9. RCC-CW - Rules for design and construction of PWR nuclear civil works

    International Nuclear Information System (INIS)

    2016-01-01

    RCC-CW describes the rules for designing, building and testing civil engineering works in PWR reactors. It explains the principles and requirements for the safety, serviceability and durability of concrete and metal frame structures, based on Eurocode design principles (European standards for the structural design of construction works) combined with specific measures for safety-class buildings. The code is produced as part of the RCC-CW Subcommittee, which includes all the parties involved in civil engineering works in the nuclear sector: clients, contractors, general and specialized firms, consultancies and inspection offices. The code covers the following areas relating to the design and construction of civil engineering works that play an important safety role: geotechnical aspects, reinforced concrete structures and galleries, pre-stressed containments with metal liner, metal containment and pool liners, metal frames, anchors, concrete cylinder pipes, containment leak tests. The RCC-CW code is available as an ETC-C version specific to EPR projects (European pressurized reactor). Contents of the 2016 edition of the RCC-CW Code: Part G - General: scope, standards, notations, quality management, general principles; Part D - Design: actions and combinations of actions, geotechnical aspects, pre-stressed or reinforced concrete structures, metal containment liners, metal pool liners, metal frames, anchors; Part C - Construction: geotechnical aspects, concrete, surface finish and formwork, reinforcement for reinforced concrete, pre-stressing processes, prefabricated concrete elements, metal containment liners, metal pool liners, metal frames, anchors, embedded pipelines, joint sealing, survey networks and tolerances; Part M - Maintenance and monitoring: containment integrity and rate tests

  10. Improved nuclear reactor construction with bottom supported reactor vessel

    International Nuclear Information System (INIS)

    Sharbaugh, J.E.

    1987-01-01

    An improved liquid metal nuclear reactor construction has a reactor core and a generally cylindrical reactor vessel for holding liquid metal coolant and housing the core within the pool. A generally cylindrical concrete containment structure surrounds the reactor vessel and a central support pedestal is anchored to the containment structure base mat and supports the bottom wall of the reactor vessel and the reactor core. The periphery of the reactor vessel bore is supported by an annular structure which allows thermal expansion but not seismic motion of the vessel, and a bed of thermally insulating material uniformly supports the vessel base whilst allowing expansion thereof. A guard ring prevents lateral seismic motion of the upper end of the reactor vessel. The periphery of the core is supported by an annular structure supported by the vessel base and keyed to the vessel wall so as to be able to expand but not undergo seismic motion. A deck is supported on the containment structure above the reactor vessel open top by annular bellows, the deck carrying the reactor control rods such that heating of the reactor vessel results in upward expansion against the control rods. (author)

  11. Concrete for the construction of No. 1 nuclear power generator of Tokyo Denryoku Co.'s Kashiwazaki, Kariha nuclear power station

    International Nuclear Information System (INIS)

    Suzuki, Yasuyoshi; Eguchi, Kiyoshi; Nakakomi, Akira.

    1985-01-01

    The construction of the No.1 power generator of Kariha nuclear power generator was completed on March 1985, and the installations of equipments are on their way aiming the start in October 1960. About 900,000 m 3 of concrete was produced and used for whole work and about 500,000 m 3 out of total was used for the construction of plant building. For constructing reactor building and turbin building, the concrete must have shielding property against radiation. The specific gravity no less than 2.5 was required for dry state of laid concrete. In order to supply very large amount of concrete with stable quality, preliminary investigation on raw materials including aggregates, fly-ash and surface active agents, were made. Aggregates were stored in underground bins to keep the temperature constant for the purpose of obtaining mixed concrete with constant temperature. For determining the mixing rate of concrete, physical test such as slump test, determination of air content, determinations of strengths and specific gravities of solidified concrete. Quality control committee was established to observe the optimum condition, which were confirmed by preliminary tests, of concrete preparation. As the results of detailed preliminary investigation on respective raw material and strict quality control from the source of raw material to mixed concrete, the supply of concrete with stable quality which conforms every requirement of standard, was possible. (Ishimitsu, A.)

  12. Advanced design and construction technology for ABWR

    International Nuclear Information System (INIS)

    Kawahara, Akira

    2003-01-01

    Recently, many countries start planning to construct nuclear plants, and the electric power companies and the plant suppliers are acutely aware of the importance of the technical infrastructure required for construction planning and execution as this has a significant influence on construction costs. Plant suppliers in Japan have been focusing its attention on the efficiency of construction from earlier, because of its significant role in determining overall construction costs. Through continuous efforts to reduce fieldwork costs, we have developed unique technologies, especially the 3D-CAD system and other advanced construction technologies including modularization. We, plant suppliers are now turning its attention to overseas nuclear plants construction also, and are developing more rational, economical, and global construction based on its vast experience in construction techniques. In this report, the evolution of plant engineering methods and construction technologies, the present level of progress in construction, and technical developments for the future, are described. (author)

  13. US nuclear policy and business trend of Japan's nuclear industries

    International Nuclear Information System (INIS)

    Matsuo, Yuji

    2010-01-01

    As several countries in the east-Asia and middle-east area have been taking an increasing interest in the deployment of nuclear power generation, Japan's nuclear industries have promoted international business activities including the success in the bid of second nuclear power plants in Vietnam. While there are plans for more than thirty of new reactors in the US, the lifetime extension of existing aged reactors, development of non-existing natural gas and trend of greenhouse gases reduction measures have dampened these plans and probably most of new units will not start construction by 2030. This article reviewed the details of US's new nuclear power introduction, trend of recent government's policies, future perspective of nuclear power construction and business trend of Japan's nuclear industries. Japan's industries should be flexible regarding nuclear power as one option to realize low-carbon society. (T. Tanaka)

  14. Looking back on safety management in construction of advanced thermal nuclear power plant 'Fugen'

    International Nuclear Information System (INIS)

    Emori, Kengo

    1979-01-01

    The safety management of the advanced thermal nuclear power plant ''Fugen'' during the period from the preparation of plant construction in October, 1970, to the full power operation in March, 1979, is looked back and explained. Any large human and material accidents did not occur during the long construction time. The total numbers of persons and hours were 1.397 x 10 6 workers and 11.55 x 10 6 hours, respectively. The number of labor accidents was twenty with no dead person, the number of loss days was 645 days, the number of accident rate was 1.73, the intensity rate was 0.06, and the mean rate of labor accidents per year per 1000 workers was 6.4. The radiation exposure dose was 65.27 man-rem for the managed 1804 workers in total, during the testing and operating periods. These data show that the safety management for ''Fugen'' is very excellent, considering the following special features: 1) there were many works which were carried out for the first time, 2) the construction of the plant was conducted by five contractors taking partial charge, there were many kinds of construction works, the construction and testing periods were long, and the workers had to go to the site from Tsuruga city by car and bus. The organization of preventing disasters, the concrete implementation items for safety management, including the planning of activities, various meetings, patrol, education and training, the honoring system, the prevention of traffic accident and so on, and the results of actual safety management are explained with the reflection. (Nakai, Y.)

  15. Nuclear Technology Review 2015

    International Nuclear Information System (INIS)

    2015-08-01

    With 438 reactors operating at the end of 2014, nuclear energy had a global generating capacity of 376.2 GW(e). There was only one permanent shutdown. There were five new grid connections and three construction starts on new reactors. Near and long term growth prospects remained centred in Asia, particularly in China. Of the 70 reactors under construction, 46 were in Asia, as were 32 of the last 40 reactors that have been connected to the grid since 2004. Thirty countries currently use nuclear power and about the same number are considering, planning or actively working to include it as part of their energy mix. Of the 30 operating countries, 13 are either constructing new plants or actively completing previously suspended construction projects, and 12 are planning either to construct new plants or to complete suspended construction projects. Several countries that have decided to introduce nuclear power are at advanced stages of infrastructure preparation. The IAEA’s 2014 projections show a growth between 8% and 88% in nuclear power capacity by the year 2030. Growth of population and demand for electricity in the developing world, recognition of the role nuclear power plays in reducing greenhouse gas emissions, the importance of security of energy supply and the volatility of fossil fuel prices point to nuclear energy playing an important role in the energy mix in the long run. Safety improvements have continued to be made at nuclear power plants (NPPs) throughout the world. These have included identifying and applying lessons learned from the accident at the Fukushima Daiichi Nuclear Power Plant, improving the effectiveness of defence in depth, strengthening emergency preparedness and response capabilities, enhancing capacity building, and protecting people and the environment from ionizing radiation

  16. Nuclear Technology Review 2014

    International Nuclear Information System (INIS)

    2014-08-01

    With 434 nuclear power reactors in operation worldwide at the end of 2013, nuclear energy had a global generating capacity of 371.7 GW(e). There were four new grid connections and ten construction starts on new reactors. Belarus became the second nuclear ‘newcomer’ State in three decades to start building its first nuclear power plant. Near and long term growth prospects remained centred in Asia, particularly in China. The 72 reactors under construction in 2013 represented the highest number since 1989. Of these, 48 were in Asia, as were 42 of the last 52 new reactors to have been connected to the grid since 2000. Thirty States currently use nuclear power and about the same number are considering including it as part of their energy mix. Of the 30 States already operating nuclear power plants, 13 are either constructing new plants or actively completing previously suspended constructions, and 12 are planning to either construct new plants or to complete suspended constructions. The IAEA Ministerial Conference on Nuclear Power in the 21st Century, held in June 2013, reaffirmed that nuclear power remains an important option for many States to improve energy security, reduce the impact of volatile fossil fuels prices and mitigate the effects of climate change. The Concluding Statement said that “nuclear power, as a stable base-load source of electricity in an era of ever increasing global energy demands, complements other energy sources including renewables.” In the IAEA’s 2013 projections, nuclear power is expected to grow by between 17% as the low projection and 94% as the high projection by 2030. These figures are slightly lower than projected in 2012, reflecting the continued impact of the Fukushima Daiichi accident, the low prices of natural gas and the increasing use of renewable energy. Additional information focuses on the linkages between nuclear power and climate change, as nuclear power, hydropower and wind energy have the lowest life cycle

  17. Structural response of nuclear containment shield buildings with unanticipated construction openings

    Science.gov (United States)

    Mac Namara, Sinead Caitriona

    As Nuclear Power Plants age many require steam generator replacement. There is a nickel alloy in the steam generator tubes that is susceptible to stress cracking and although these cracks can be sealed the generator becomes uneconomical without 10%-15% of the tubes. The steam generator in a typical nuclear power plant is housed in the containment structure next to the reactor. The equipment hatch is not big enough to facilitate steam generator replacement, thus construction openings in the dome of the containment structure are required. To date the structural consequences of construction openings in the dome have not been examined. This thesis examines the effects of such openings. The prototype concrete dome is made up of a 2 ft thick dome atop 3 ft thick and 170 ft high cylindrical walls (radius 65.5 ft) with a tension ring 15 ft high and 8 ft thick in between. The dome of the building is cast in two layers; a lower 9 inch layer that serves as the formwork for an upper 15 inch layer. The weight of the dome is carried in axial compression along the hoops and meridians of the dome. The first finite element model uses shell elements and considers two limiting load cases; where the two layers act as one, and where the lower layer carries the weight of both. The openings interrupt the hoops and meridians and the weight of the dome must be redistributed around the openings. Without openings, the stresses due to dead load in the structure are very low when compared to the material strength. The impact of the openings is increased compression stresses near the opening. The maximum stresses are approximately four times larger than in the original structure. These results are confirmed by the second model which is made from layers of solid elements. This model shows a significant difference between the compression on the top surface of the dome, in the affected areas, and that on the bottom surface, leading to shear stresses. These shear stresses are largest around the

  18. Construction time of PWRs

    International Nuclear Information System (INIS)

    Moreira, João M.L.; Gallinaro, Bruno; Carajilescov, Pedro

    2013-01-01

    The construction time of PWRs is studied considering published data about nuclear power plants in the world. For the 268 PWRs in operation in 2010, the mode of the construction time distribution is around 5–6 years, and 80% of the plants were built in less than 120 months. To circumvent the problem of comparing plants with different size we normalized the construction time to plants with 1 GW. We restricted the analysis to 201 PWRs which suffered less from external factors that were beyond the control of the management from 1965 to 2010. The results showed that the normalized construction time did not increase over the years and nor with the plants’ gross power level. The learning rate of the industry regarding normalized construction times showed a reduction with 95% confidence level of about 0.56±0.07 months for each 10 GW of installed capacity. Over the years the normalized construction time decreased and became more predictable. The data showed that countries with more centralized regulatory, construction and operation environments were able to build PWRs in shorter times. Countries less experienced with the nuclear technology built PWRs in longer times. - Highlights: ► The construction time of PWRs is analyzed based on historical data. ► Different factors affecting construction time are considered in the analyses. ► The normalized construction time of PWRs decreased with time and gross power level. ► Countries with more centralized institutions built PWRs more quickly

  19. Nuclear steam supply system and method of installation

    International Nuclear Information System (INIS)

    Tower, S.N.; Christenson, J.A.; Braun, H.E.

    1989-01-01

    This patent describes a method of providing a nuclear reactor power plant at a predetermined use site accessible by predetermined navigable waterways. The method is practiced with apparatus including a nuclear reactor system. The system has a nuclear steam-supply section. The method consists of: constructing a nuclear reactor system at a manufacturing site remote from the predetermined use site but accessible to the predetermined waterways for transportation from the manufacturing site to the predetermined use site, the nuclear reactor system including a barge with the nuclear steam supply section constructed integrally with the barge. Simultaneously with the construction of the nuclear reactor system, constructing facilities at the use site to be integrated with the nuclear reactor system to form the nuclear-reactor power plant; transporting the nuclear reactor system along the waterways to the predetermined use site; at the use site joining the removal parts of the altered nuclear reactor system to the remainder of the altered nuclear reactor system to complete the nuclear reactor system; and installing the nuclear reactor system at the predetermined use site and integrating the nuclear reactor system to interact with the facilities constructed at the predetermined use site to form the nuclear-reactor power plant

  20. RCC-M: Design and construction rules for mechanical components of PWR nuclear islands

    International Nuclear Information System (INIS)

    2017-01-01

    AFCEN's RCC-M code concerns the mechanical components designed and manufactured for pressurized water reactors (PWR). It applies to pressure equipment in nuclear islands in safety classes 1, 2 and 3, and certain non-pressure components, such as vessel internals, supporting structures for safety class components, storage tanks and containment penetrations. RCC-M covers the following technical subjects: sizing and design, choice of materials and procurement. Fabrication and control, including: associated qualification requirements (procedures, welders and operators, etc.), control methods to be implemented, acceptance criteria for detected defects, documentation associated with the different activities covered, and quality assurance. The design, manufacture and inspection rules defined in RCC-M leverage the results of the research and development work pioneered in France, Europe and worldwide, and which have been successfully used by industry to design and build PWR nuclear islands. AFCEN's rules incorporate the resulting feedback. Use: France's last 16 nuclear units (P'4 and N4); 4 CP1 reactors in South Africa (2) and Korea (2); 44 M310 (4), CPR-1000 (28), CPR-600 (6), HPR-1000 (4) and EPR (2) reactors in service or undergoing construction in China; 4 EPR reactors in Europe: Finland (1), France (1) and UK (2). Content: Section I - nuclear island components, subsection 'A': general rules, subsection 'B': class 1 components, subsection 'C': class 2 components, subsection 'D': class 3 components, subsection 'E': small components, subsection 'G': core support structures, subsection 'H': supports, subsection 'J': low pressure or atmospheric storage tanks, subsection 'P': containment penetration, subsection 'Q': qualification of active mechanical components, subsection 'Z': technical appendices; section II - materials; section III - examination

  1. Construction of scales to measure leadership behavior at nuclear power plants. 2

    Energy Technology Data Exchange (ETDEWEB)

    Misumi, Jyuji; Yamada, Akira [Institute of Nuclear Safety System Inc., Kyoto (Japan); Shinohara, Shinobu [and others

    1994-05-01

    We tried to construct the PM leadership behavior measuring scales at nuclear power plants. In our factor analysis of leadership types of shift supervisors, maintenance and repair subsection chiefs and sub contractors` field leaders, three factors respectively were found. In the leadership scales for shift supervisors, the first factor was named the factor of group maintenance, the second factor was named the factor of directive-order for goal achievement and the third factor was named the factor of specialty for goal achievement. For maintenance and repair subsection chiefs, the first factor was named the factor of directive-order for goal achievement, and second factor was named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for goal achievement. For subcontractors` leaders, the first factor was named the factor of directive-specialty for goal achievement, the second factor named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for achievement. We constructed PM leadership measuring scales for each advisory position and verified its validity by using workplace `morale`-(satisfaction, etc.) as a subordinate variable. Also, in regard to the distribution of scales, we verified the validity of distance scales by examining it by Quantification III. (author)

  2. Construction of scales to measure leadership behavior at nuclear power plants. 2

    International Nuclear Information System (INIS)

    Misumi, Jyuji; Yamada, Akira; Shinohara, Shinobu

    1994-01-01

    We tried to construct the PM leadership behavior measuring scales at nuclear power plants. In our factor analysis of leadership types of shift supervisors, maintenance and repair subsection chiefs and sub contractors' field leaders, three factors respectively were found. In the leadership scales for shift supervisors, the first factor was named the factor of group maintenance, the second factor was named the factor of directive-order for goal achievement and the third factor was named the factor of specialty for goal achievement. For maintenance and repair subsection chiefs, the first factor was named the factor of directive-order for goal achievement, and second factor was named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for goal achievement. For subcontractors' leaders, the first factor was named the factor of directive-specialty for goal achievement, the second factor named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for achievement. We constructed PM leadership measuring scales for each advisory position and verified its validity by using workplace 'morale'-(satisfaction, etc.) as a subordinate variable. Also, in regard to the distribution of scales, we verified the validity of distance scales by examining it by Quantification III. (author)

  3. Construction of a bibliographic information database for the Nuclear Science and Engineering (IX)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Oh, Jeong Hun; Choi, Kwang; Keum, Jong Yong [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows: 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this seventh year, 40,000 records, as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the the effectiveness of R and D activities, but also to obviate the duplicated research works. 1 fig., 1 tab. (Author)

  4. Construction of a bibliographic information database for the nuclear science and engineering (VIII)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Kim, Soon Ja; Kim, Young Min; Oh, Jeong Hun; Choi, Kwang [Korea Atomic Energy Research Institute, Taejon (Korea)

    1998-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science ad Technology Access Line)'s BD through the KREONet (Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows : 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this seventh year, 35,000 record as total of inputted data, are added to the existing SATURN DB using the input system. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. 1 tab. (Author)

  5. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction

    International Nuclear Information System (INIS)

    Diaz Prada, J. I.; Cubian, B.

    2014-01-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  6. Current construction status of Korea Wolsong Nuclear Environment Management Center (low and intermediate level radioactive waste disposal facility)

    International Nuclear Information System (INIS)

    Suzuki, Yasuo

    2010-01-01

    Through the RANDEC delegation tour to Korea in Nov. 2009, we have earned new information on recent development of the radioactive waste management in Korea. In this report, we will introduce such development in Korea, focusing on the current construction status of Korean LILW (low and intermediate level radioactive waste) disposal site, now called, Wolsong Nuclear Environment Management Center. (author)

  7. Nuclear Gauges Used in Road Construction | RadTown USA ...

    Science.gov (United States)

    2017-08-07

    Nuclear gauges use radioactive sources to measure the thickness, density or make-up of a wide variety of materials and surfaces. When properly used, nuclear gauges will not expose the public to radiation. Nuclear gauges must be used safely and disposed of properly.

  8. Radiation dose to construction workers at operating nuclear power plant sites. Volume 2. Appendices A--F. Final report, September 1975--September 1978

    International Nuclear Information System (INIS)

    Endres, G.W.R.; Shipler, D.B.

    1978-12-01

    These appendices contain the dosimetry procedures and details of the personnel and environmental dosimeters used for the Radiation Dose to Construction Workers at Operating Nuclear Power Plant Sites Study. A printout of the computer codes used to analyze dosimeter data is included along with all the raw data obtained. Appendices C through F contain computer output and log-normal plots of dosimetry data for environmental location and construction worker groups

  9. Nuclear power in East Asia

    International Nuclear Information System (INIS)

    Abelson, P.H.

    1996-01-01

    This editorial discusses the shifting dominance in the nuclear reactor technology from the USA to new leadership in East Asia. With the expanding economies and electricity demand, Design, construction and operation of a large number of nuclear power plants in east Asia will support nuclear engineers, technologist, manufacturing facilities, and potential weapons experts. In contrast, the cessation of construction of power reactors in the US is leading to deminished nuclear capabilities

  10. Westinghouse experience over the past 10 years in negotiating and constructing nuclear power plants

    International Nuclear Information System (INIS)

    Richards, D.E.

    1979-01-01

    Reason for delays in delivery times for nuclear plant are discussed in the light of Westinghouse experience. Today the lead time for the construction of the plant is no longer dictated by the lead time of the nuclear steam supply system. The increased complexity of contract negotiations and of standards and specifications contributes to the delays. Site work is constantly subject to delays due to various labour problems. The main delays stem from regulatory authorities, environmentalists and political considerations. Lateness on the plant causes problems of warranty, storage of equipment and of finance. Westinghouse procedures for alleviating delays during erection are outlined. As the start-up schedule dictates erection, purchasing and design, it should be established as early as possible. A typical overall schedule for a PWR is outlined. It is concluded that completion of plant within schedule requires decisions on basic principles and sufficient detailed planning and organisational structures to be established before the start of the project followed by strong project management. The discussion following the conference is also recorded. (U.K.)

  11. Evaluation of regulations and norms for concrete constructions in Swedish nuclear power plants; Utvaerdering av regler och normer foer betongkonstruktioner i svenska kaernkraftsanlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Jovall, Ola (Scanscot Technology AB, Lund (Sweden))

    2010-12-15

    In the SSM's regulations and recommendations, there are at present no specific requirements and adequate guidance on how concrete structures should be designed in case of new buildings or verification analyses of existing buildings. The result of the work presented in this report constitute the basis for SSM's ongoing regulatory project Investigation regarding requirements for construction, design, analysis and review of reactor containments and other safety-related building structures. The project includes the following: 1. Summary of the regulations and requirements that have been applied at the initial design and new construction of concrete structures at the Swedish nuclear power plants. 2. Comparison and evaluation of relevant regulations published by the European and North American authorities. 3. Comparison and evaluation of relevant codes, standards, guidelines etc. for load-bearing concrete structures in different countries. 4. Conclusions and recommendations to the regulatory framework for the design of load-bearing concrete structures at the Swedish nuclear power plants. Based on a comparison and evaluation of regulations from the U.S., Canada, France, the UK, Finland and Sweden, as well as guidelines established by the international organizations IAEA and EUR, the following general recommendations are provided as a regulatory framework for the design of load-bearing concrete structures at the Swedish nuclear power plants: 1. The Eurocodes will replace the BKR design rules of Swedish National Board of Housing, Building and Planning as the conventional building regulations on the construction of nuclear power plants. 2. A general review and updating of the existing industry standard Design rules for buildings at nuclear facilities DRB:2001 is implemented. Reference is made to the Eurocodes with regard to conditions of conventional design rules

  12. Order for execution of the law concerning regulations of nuclear source materials, nuclear fuel materials and reactors

    International Nuclear Information System (INIS)

    1987-01-01

    Chapeter 1 specifies regulations concerning business management for refining and processing, which cover application for designation of refining operation, application for permission for processing operation, and approval of personnel responsible for handling nuclear fuel. Chapter 2 specifies regulations concerning construction and operation of nuclear reactors, which cover application for construction of nuclear reactors, reactors in a research and development stage, application for permission concerning nuclear reactors mounted on foreign nuclear powered ships, application for permission for alteration concerning construction of nuclear reactors, application for permission for alteration concerning nuclear reactors mounted on foreign nuclear powered ships, nuclear reactor facilities to be subjected to regular inspection, nuclear reactor for which submission of operation plan is not required, and application for permission for transfer of nuclear reactor. Chapter 2 also specifies regulations concerning business management for reprocessing and waste disposal. Chapter 3 stipulates regulations concerning use of nuclear fuel substances, nuclear material substances and other substances covered by international regulations, which include rules for application for permission for use of nuclear fuel substances, etc. Supplementary provisions are provided in Chapter 4. (Nogami, K.)

  13. Concrete structures for nuclear facilities

    International Nuclear Information System (INIS)

    1996-01-01

    The detailed requirements for the design and fabrication of the concrete structures for nuclear facilities and for the documents to be submitted to the Finnish Centre for Radiation and Nuclear Safety (STUK) are given in the guide. It also sets the requirements for the inspection of concrete structures during the construction and operation of facilities. The requirements of the guide primarily apply to new construction. As regards the repair and modification of nuclear facilities built before its publication, the guide is followed to the extent appropriate. The regulatory activities of the Finnish Centre for Radiation and Nuclear Safety during a nuclear facility's licence application review and during the construction and operation of the facility are summarised in the guide YVL 1.1

  14. Nuclear industry project audit and countermeasures

    International Nuclear Information System (INIS)

    Li Yongxin; Zhang Jian

    2012-01-01

    With China's increasing use of nuclear energy, nuclear power related construction projects related to the deepening of the audit, some of the nuclear industry in construction field of the dominant issues have been more effective containment, such as inflated workload, high-set fixed standards, to improve billing unit price, which overestimate the risk calculation tools and behavior completed audit of the accounts have been able to escape his stuff. However, some nuclear industry construction field with a hidden problem because of its hidden nature, not easily found, and some even have intensified the trend. Construction funds to the country such problems caused by the loss of waste is enormous, to the breeding of corruption provided the soil is fertile, if not promptly and effectively to stop the breeding will spread. This paper on the current construction of the nuclear industry in several major areas of the hidden problems are discussed, and the angle from the audit of appropriate countermeasures. (authors)

  15. Nuclear reactor control room construction

    International Nuclear Information System (INIS)

    Lamuro, R.C.; Orr, R.

    1993-01-01

    A control room for a nuclear plant is disclosed. In the control room, objects labelled 12, 20, 22, 26, 30 in the drawing are no less than four inches from walls labelled 10.2. A ceiling contains cooling fins that extend downwards toward the floor from metal plates. A concrete slab is poured over the plates. Studs are welded to the plates and are encased in the concrete. 6 figures

  16. Managing for nuclear operational effectiveness

    International Nuclear Information System (INIS)

    Nevins, P.A.; Kasperski, D.C.

    1990-01-01

    The nuclear energy industry worldwide is changing, with significant implications for nuclear utility managers. While the UK and US nuclear industries have many differences, a number of the lessons learned in the US have direct applicability to the UK. Just as the physics behind nuclear power transcends political boundaries, so do many of the management techniques that are necessary to run an efficient and sound operation. The US nuclear industry is no longer a construction-based industry, as it has been for years. As nuclear construction slows or stops in many parts of the world and nuclear power comes under increased scrutiny everywhere, the industry is shifting away from a construction emphasis and towards an operations and maintenance emphasis. In North America more than one-half of nuclear executives believe that plant operating and maintenance costs, and not construction-related problems, are their number one concern. Furthermore, when asked what actions they would expect to take as a result of this concern, the majority indicated that the actions would be management-related for the most part, and included items such as: emphasize operating improvements, emphasize management improvements, upgrade outage management and maintenance management programs, increase senior management involvement and set management performance criteria. (author)

  17. Design and construction work of underground pit for existing light oil tank foundation at Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kikuchi, Keita; Date, Masanao; Horimi, Shingo

    2017-01-01

    Based on the new regulatory standards for commercial power plant reactors enforced in July 2013, Onagawa Nuclear Power Station of Tohoku Electric Power Co., Inc. implemented various safety measure works. One of them was a measure for the existing light oil tank foundation for emergency diesel generators for Unit 2 reactor. In consideration of tornado, external fire, and earthquake resistance, the company implemented the underground pit construction for a light oil tank basement by utilizing the existing oil retaining wall and foundation. This paper reported the outline of the planning, design, and implementation of construction works, which were carried out while securing quality and safety. Upon installation of the underground pit, the company utilized the existing oil retaining wall from the viewpoint of reducing construction costs, shortening time schedule, and reducing environmental burden. As a result of checking bending and axial force, part of these values exceeded the design reference values. So, 3-dimensional shell model was applied, and the simulation results showed sufficient seismic margin. As a measure to secure seismic margin against shear force, Ceramic-Cap-bar construction method was adopted. Upon construction, the company adopted the water jet method, and devised the sequential order of construction. In parallel with the day and night work and tank installation, it constructed the top slab, which secured the time schedule and quality. (A.O.)

  18. Nuclear power development

    International Nuclear Information System (INIS)

    Nealey, S.

    1990-01-01

    The objective of this study is to examine factors and prospects for a resumption in growth of nuclear power in the United States over the next decade. The focus of analysis on the likelihood that current efforts in the United States to develop improved and safer nuclear power reactors will provide a sound technical basis for improved acceptance of nuclear power, and contribute to a social/political climate more conducive to a resumption of nuclear power growth. The acceptability of nuclear power and advanced reactors to five social/political sectors in the U.S. is examined. Three sectors highly relevant to the prospects for a restart of nuclear power plant construction are the financial sector involved in financing nuclear power plant construction, the federal nuclear regulatory sector, and the national political sector. For this analysis, the general public are divided into two groups: those who are knowledgeable about and involved in nuclear power issues, the involved public, and the much larger body of the general public that is relatively uninvolved in the controversy over nuclear power

  19. Some aspects of nuclear power development in Czechoslovakia

    International Nuclear Information System (INIS)

    Simandl, S.; Stefec, V.

    1986-01-01

    Some technical and economic aspects of the development of nuclear power in Czechoslovakia are discussed. Specific conditions include the high population density of the territory and related factors as well as the shortage of raw materials for the construction of technological equipment and for the construction of buildings. It is stated that projects of future nuclear power plants should use reserves, such as are available in the standard project of a WWER-1000 nuclear power plant now being used in Temelin, as against foreign nuclear power plants. This mainly includes a bigger built-up area per installed megawatt of power and a greater number of personnel for operation and maintenance. Also discussed is the world-wide growth of capital costs, of construction time and of the number of workers needed for the construction of nuclear power plants. With the exception of the V-2 nuclear power plant the construction time of Czechoslovak nuclear power plants does not exceed world average. The maximum number of workers required for construction, however, compares unfavourably with advanced capitalist countries. Operating costs in Czechoslovakia are more favourable for nuclear power plants than for coal burning power plants and pumped-storage hydroelectric plants. (Z.M.)

  20. Status of October 1, 2004 of the repartition of nuclear reactors connected to the grid and under construction in the world

    International Nuclear Information System (INIS)

    2004-01-01

    This document is a table giving the number of nuclear reactors connected to the grid and under construction in the European countries and in the rest of the world. The percentage of electricity produced by these reactors in 2003 is indicated. (J.S.)

  1. Construction: first of St. Lucie unit 2 successes

    International Nuclear Information System (INIS)

    Conway, W.F.

    1989-01-01

    The Nuclear Regulatory Commission (NRC) granted a full power operating license for St. Lucie Unit 2 on June 10, 1983, just six years after construction began. The industry average for nuclear power plant construction during this time was approximately ten years. The rate of completion had a positive effect on the cost of the facility. The price of the unit was $1.42 billion as compared to the $2 billion to $5 billion range experienced by other utilities for nuclear plants. These accomplishments were not serendipitous but the results of management techniques and personnel attitudes involved in the construction of the unit. More importantly, many of these same techniques and attitudes have now become part of a quality improvement program at St Lucie and are reflected in its performance indicators. This paper analyzes the construction success of St Lucie Unit 2 and demonstrates that excellent performance in the construction phase can be carried over to the operation of a facility

  2. China's nuclear programs and policies

    International Nuclear Information System (INIS)

    Wang, C.

    1983-01-01

    Economics and the futility of arms competition with the US and USSR has forced China to shift its nuclear effort to peaceful uses, although its current nuclear-deterrent warrants including China in arms negotiations. China's nuclear program began during the 1950s with an emphasis on weaponry and some development in space technology. Proponents of nuclear power now appear to have refuted the earlier arguments that nuclear-plant construction would be too slow, too dangerous and polluting, and too expensive and the idea that hydro resources would be adequate. The current leadership supports a serious nuclear-power-plant construction program. 6 references

  3. Nuclear spectrum influence on North Korean and Japanese identity constructs

    International Nuclear Information System (INIS)

    Fernandez-Gallois, Yohann

    2017-01-01

    This article introduces the concept of 'nuclear spectrum' which reflects the ability of nuclear weapons to produce effects in diplomatic and strategic fields. The author analyzes the influence of the American nuclear spectrum in East Asia and the interactions with the nuclear spectra of North Korea and Japan. He shows that the American nuclear umbrella deeply influences the inter-state relations between the two Korea and Japan

  4. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2005-01-01

    This 2005 edition of the Elecnuc booklet summarizes in tables all numerical data relative to the nuclear power plants worldwide. These data come from the PRIS database managed by the IAEA. The following aspects are reviewed: 2004 highlights; main characteristics of reactor types; map of the French nuclear power plants on 2005/01/01; worldwide status of nuclear power plants at the end of 2004; units distributed by countries; nuclear power plants connected to the grid by reactor-type group; nuclear power plants under construction on 2004; evolution of nuclear power plant capacities connected to the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear power plants by country at the end 2004; performance indicator of PWR units in France; trend of the generation indicator worldwide; 2004 load factor by owners; units connected to the grid by countries at 12/31/2004; status of licence renewal applications in USA; nuclear power plants under construction at 12/31/2004; shutdown reactors; exported nuclear capacity in net MWe; exported and national nuclear capacity connected to the grid; exported nuclear power plants under construction or order; exported and national nuclear capacity under construction or order; recycling of plutonium in LWR; Mox licence plant projects; Appendix - historical development; acronyms, glossary

  5. Construction of a model of the process of accumulation of radionuclides of corrosion products on the equipment in nuclear power plants with boiling-water reactors

    International Nuclear Information System (INIS)

    Tevlin, S.A.

    1985-01-01

    This paper addresses the problem of corrosion of the structural materials of the reactor loop. This problem can be solved by constructing physical models of the process of accumulation of radionuclides on the equipment at nuclear power plants and by constructing the analytical apparatus for describing them. These models are presented here, and allow the analyzing of the effect of separate states and thermophysical factors, determination of the basic factors, and the ability to foresee in timely fashion the water state and structural measures required to lower the rate of growth and to decrease the amount of radionuclides deposited on the equipment in the nuclear power plant

  6. Nuclear Power Today and Tomorrow

    International Nuclear Information System (INIS)

    Bychkov, Alexander

    2013-01-01

    Worldwide, with 437 nuclear power reactors in operation and 68 new reactors under construction, nuclear power's global generating capacity reached 372.5 GW(e) at the end of 2012. Despite public scepticism, and in some cases fear, which arose following the March 2011 Fukushima Daiichi nuclear accident, two years later the demand for nuclear power continues to grow steadily, albeit at a slower pace. A significant number of countries are pressing ahead with plans to implement or expand their nuclear power programmes because the drivers toward nuclear power that were present before Fukushima have not changed. These drivers include climate change, limited fossil fuel supply, and concerns about energy security. Globally, nuclear power looks set to continue to grow steadily, although more slowly than was expected before the Fukushima Daiichi nuclear accident. The IAEA's latest projections show a steady rise in the number of nuclear power plants in the world in the next 20 years. They project a growth in nuclear power capacity by 23% by 2030 in the low projection and by 100% in the high projection. Most new nuclear power reactors planned or under construction are in Asia. In 2012 construction began on seven nuclear power plants: Fuqing 4, Shidaowan 1, Tianwan 3 and Yangjiang 4 in China; Shin Ulchin 1 in Korea; Baltiisk 1 in Russia; and Barakah 1 in the United Arab Emirates. This increase from the previous year's figures indicates an on-going interest and commitment to nuclear power and demonstrates that nuclear power is resilient. Countries are demanding new, innovative reactor designs from vendors to meet strict requirements for safety, national grid capacity, size and construction time, which is a sign that nuclear power is set to keep growing over the next few decades.

  7. Nuclear safety. Concerns about the nuclear power reactors in Cuba

    International Nuclear Information System (INIS)

    Wells, Jim; Aloise, Gene; Flaherty, Thomas J.; Fitzgerald, Duane; Zavala, Mario; Hayward, Mary Alice

    1992-09-01

    In 1976, the Soviet Union and Cuba concluded an agreement to construct two 440-megawatt nuclear power reactors near Cienfuegos on the south central coast of Cuba, about 180 miles south of Key West, Florida. The construction of these reactors, which began around 1983, was a high priority for Cuba because of its heavy dependence on imported oil. Cuba is estimated to need an electrical generation capacity of 3,000 megawatts by the end of the decade. When completed, the first reactor unit would provide a significant percentage (estimated at over 15 percent) of Cuba's need for electricity. It is uncertain when Cuba's nuclear power reactors will become operational. On September 5, 1992, Fidel Castro announced the suspension of construction at both of Cuba's reactors because Cuba could not meet the financial terms set by the Russian government to complete the reactors. Cuban officials had initially planned to start up the first of the two nuclear reactors by the end of 1993. However, before the September 5 announcement, it was estimated that this reactor would not be operational until late 1995 or early 1996. The civil construction (such as floors and walls) of the first reactor is currently estimated to be about 90 percent to 97 percent complete, but only about 37 percent of the reactor equipment (such as pipes, pumps, and motors) has been installed. The civil construction of the second reactor is about 20 percent to 30 percent complete. No information was available about the status of equipment for the second reactor. According to former Cuban nuclear power and electrical engineers and a technician, all of whom worked at the reactor site and have recently emigrated from Cuba, Cuba's nuclear power program suffers from poor construction practices and inadequate training for future reactor operators. One former official has alleged, for example, that the first reactor containment structure, which is designed to prevent the accidental release of radioactive material into

  8. Nuclear energy and nuclear technology in Switzerland

    International Nuclear Information System (INIS)

    Graf, P.

    1975-01-01

    The energy crisis, high fuel costs and slow progress in the development of alternative energy sources, e.g. solar energy have given further impetus to nuclear power generation. The Swiss nuclear energy programme is discussed and details are given of nuclear station in operation, under construction, in the project stage and of Swiss participation in foreign nuclear stations. Reference is made to the difficulties, delays and resulting cost increases caused by local and regional opposition to nuclear power stations. The significant contributions made by Swiss industry and Swiss consulting engineers are discussed. (P.G.R.)

  9. Nuclear Option in Korea

    International Nuclear Information System (INIS)

    Han, K. I.

    2002-01-01

    With sixteen(16) operating nuclear units in Korea, the share of nuclear power generation reached 41% of the total electric power generation as of December 2000. A prediction is that it would further increase to 44.5% by year 2015 according to the national long term power development plan. Four units are currently under construction with 6 more units in order. With little domestic energy resource and increasing energy demand to support national economic growth, Korea has chosen nuclear power as one of the major energy sources to ensure stable power supply and to promote energy self-sufficiency. It has been recognized that nuclear power in Korea is not a selective option but rather a necessity. The Korean nuclear power development started with construction of a 600 MWe size reactor that was designed and constructed by foreign vendors. As the national grid capacity became larger, the size of nuclear units increased to 1000 MWe class. In the mean time, the need for nuclear technology self-reliance grew not only in operation and maintenance but also in construction, manufacturing and design. For this, a nuclear technology self-reliance program has been embarked with the support of the Government and utility, and the 1000 MWe class KSNP(Korean Standard Nuclear Power Plant) has been developed. The KSNPs are currently being designed, manufactured, constructed and operated by relevant Korean entities themselves. To fit into a larger capacity national grid and also to improve nuclear economic competitiveness, the 1400 MWe class KNGR(Korean Next Generation Reactor) design has been developed uprating the 1000 MWe KSNP design. Its construction project is currently under contract negotiation, and is planned to be finished by 2010. In the mean time, to be ready for future electric power market deregulation, the 600 MWe class small KSNP design is being developed downsizing the KSNP. A modular small size reactor, SMART(System Integrated Modular Advanced Reactor) is also being

  10. Present state of nuclear power business in China

    International Nuclear Information System (INIS)

    Morokuzu, Muneo

    2011-01-01

    This article presented present state of nuclear power business in China based on latest information obtained at visit at nuclear power related facilities in December 2010. China Atomic Energy Authority (CAEA) promoted nuclear power, while National Nuclear Safety Administration (NNSA) was an independent regulatory body of nuclear power. Construction of nuclear power was promoted by three national nuclear engineering development corporations: China National Nuclear Corporation (CNNC), China Guangdon Nuclear Power Corporation (CGNPC) and State Nuclear Power Technology Corporation (SNPTC). In China, 13 nuclear power reactors were in operation and 27 under construction. Shortage of nuclear engineers became evident with rapid growth of nuclear power, which forced delay of nuclear power construction schedule. Future strategies of reactor type varied domestic, French and US ones respectively dependent on CNNC, CGNPC and SNPTC, CNNC seemed to change from third generation reactor (CNP 1000) to second one (CP 1000) due to regulatory licensing difficulty of NNSA. As for advanced reactor development, large scale PWR project, HTR project and FBR development project were proceeding. As HTR project was selected as high-priority project, an experimental reactor (HTR-10) was critical in 2000 and construction of demonstration reactor started in 2009. (T. Tanaka)

  11. Quality during construction

    International Nuclear Information System (INIS)

    Rogers, C.B.

    1977-01-01

    This paper outlines the quality assurance program used by Bechtel Corp. in constructing Nuclear Power Plants. As a tool for scheduling and visualizing situations during construction, power plant scale models are used. The use of models, preplanning, detail scheduling, and early development of procedures and inspection plans, have all contributed to a lower cost integrated quality program. Quality control and quality assurance are built in, thus satisfying the regulatory requirements

  12. Radioactive material defense construction using wind fan system against nuclear fallout in the aspect of nano-scopic dispersion

    International Nuclear Information System (INIS)

    Woo, Tae Ho

    2012-01-01

    Highlights: ► A realistic radiation protection system using aerodynamics is suggested. ► Manual formation procedure is constructed by this modeling. ► Chemical and natural accidents by wind fan are applicable. ► Nuclear disaster is avoided by national defense system. ► A sample case is realistically modeled. -- Abstract: Radioactive fallout defense system (RFDS) is suggested against possible nuclear accidents. A procedure consisting of several stages is considered. In particular, the dispersion of radioactive material is investigated for the case of wind fan operation where the radioactive molecules are considered as nano-scopic material. The modeling is done for one country dealing with a possible nuclear accident in another country. This study is thus applicable to regions where westerlies are prevailing. An aerodynamic fan analysis is performed. The incoming free wind stream is characterized by random sampling in Monte-Carlo simulation. The velocity of the fan is a critical aspect of the model. This model is applicable for volcanic ashes, nuclear bomb fallout, chemical material dispersion, and any other material combined with airflow. In addition, this fan could be studied, with nano-scale considerations, by a multi-scale technique.

  13. Nuclear power plants

    International Nuclear Information System (INIS)

    1985-01-01

    Data concerning the existing nuclear power plants in the world are presented. The data was retrieved from the SIEN (Nuclear and Energetic Information System) data bank. The information are organized in table forms as follows: nuclear plants, its status and type; installed nuclear power plants by country; nuclear power plants under construction by country; planned nuclear power plants by country; cancelled nuclear power plants by country; shut-down nuclear power plants by country. (E.G.) [pt

  14. Constructability and maintainability

    International Nuclear Information System (INIS)

    Hart, R.S.

    1985-01-01

    A set of principles for minimizing the construction schedule was established at the outset of the CANDU 300 programme. Consideration of these principles and other factors led to the development of the unique CANDU 300 station layout. The paper discusses the CANDU 300 station layout and construction methods. In summary, the station layout provides 360 deg. construction access to all buildings, separation of nuclear and non-nuclear systems, precise and minimal physical interfaces between buildings, accommodation of many contractors and construction activities without interference, and maximum flexibility in terms of constructional, financial and supply arrangements. The CANDU 300 further employs modularization, shop fabrication and advanced instrumentation (multiplexers, remote processors, data highways) to minimize construction time. Many of the CANDU 300 features that enhance constructability also contribute to maintainability. These include the 360 deg. access to all principal buildings, the uncluttered and spacious building layouts, the simplification of systems and the high level of modularization. The CANDU 300 has also been designed to facilitate the replacement of all key components, thereby offering an essentially unlimited station life. A prime example is a reduction in the fuel channel inlet end-fitting diameter such that the fuel channels can be shop assembled and easily replaced after the initial 40 years of operation, without an extended unit outage. Maintainability within the reactor building has been given particular attention in the CANDU 300 design; key features of other CANDU reactors (the ability to replace a heat transport system pump motor at power, for example) have been incorporated, while accessibility and maintainability of all systems and components have been enhanced. These and other aspects of maintainability are discussed. (author)

  15. Nuclear energy in Japan

    International Nuclear Information System (INIS)

    Guillemard, B.

    1978-01-01

    After having described the nuclear partners in Japan, the author analyzes the main aspects of Japan's nuclear energy: nuclear power plants construction program; developping of light water reactors; fuel cycle politics [fr

  16. Completion of latest ABWR 'SHIKA Unit 2' construction

    International Nuclear Information System (INIS)

    Yamazaki, Tatsuhiro; Yoshimoto, Yuichiro

    2007-01-01

    The Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Company, Inc. is the first Advanced BWR unit built in Japan by a single contractor and it is among the largest nuclear power stations in Japan. Its construction started in August 1999 when the first construction permit was issued. The design and construction of the plant was carried out with utmost care for betterment of operational safety, reliability and economy. The construction advanced on schedule and the plant entered its commercial operation in March 2006 as planned. Hitachi, Ltd. supplied the entire plant from design, fabrication and construction including the reactor and steam turbine generation system. In the design and construction of the plant, the most advanced technology has been applied in order to match the civil construction process and aim to supply safest, reliable and economical power plant. (author)

  17. Nuclear power in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Rim, C S [Radioactive Waste Management Centre, Korea Atomic Energy Research Institute, Taejon, Choong-Nam (Korea, Republic of)

    1990-07-01

    Before addressing the issue of public and utility acceptance of nuclear power in Korea, let me briefly explain the Korean nuclear power program and development plan for a passively safe nuclear power plant in Korea. At present, there are eight PWRs and one CANDU in operation; two PWRs are under construction, and contract negotiations are underway for one more CANDU and two more PWRs, which are scheduled to be completed by 1997,1998 and 1999, respectively. According to a recent forecast for electricity demand in Korea, about fifty additional nuclear power plants with a generating capacity of 1000MWe are required by the year 2030. Until around 2006, Korean standardized nuclear power plants with evolutionary features such as those in the ALWR program are to be built, and a new type of nuclear power plant with passive safety features is expected to be constructed after 2006. The Korean government is making a serious effort to increase public understanding of the safety of nuclear power plants and radioactive waste storage and disposal. In addition, the Korean government has recently introduced a program of benefits for residents near nuclear power plants. By this program, common facilities such as community centers and new roads are constructed, and scholarships are given to the local students. Nuclear power is accepted positively by the utility and reasonably well by the public in Korea.

  18. Nuclear power in Korea

    International Nuclear Information System (INIS)

    Rim, C.S.

    1990-01-01

    Before addressing the issue of public and utility acceptance of nuclear power in Korea, let me briefly explain the Korean nuclear power program and development plan for a passively safe nuclear power plant in Korea. At present, there are eight PWRs and one CANDU in operation; two PWRs are under construction, and contract negotiations are underway for one more CANDU and two more PWRs, which are scheduled to be completed by 1997,1998 and 1999, respectively. According to a recent forecast for electricity demand in Korea, about fifty additional nuclear power plants with a generating capacity of 1000MWe are required by the year 2030. Until around 2006, Korean standardized nuclear power plants with evolutionary features such as those in the ALWR program are to be built, and a new type of nuclear power plant with passive safety features is expected to be constructed after 2006. The Korean government is making a serious effort to increase public understanding of the safety of nuclear power plants and radioactive waste storage and disposal. In addition, the Korean government has recently introduced a program of benefits for residents near nuclear power plants. By this program, common facilities such as community centers and new roads are constructed, and scholarships are given to the local students. Nuclear power is accepted positively by the utility and reasonably well by the public in Korea

  19. International comparison of the economy of constructing nuclear power plants by using the method of referred investment costs in Czechoslovakia and in the USA

    International Nuclear Information System (INIS)

    Majer, P.; Jelen, J.

    1989-01-01

    The method of referred investment costs was applied to a comparison of the economy of constructing the nuclear power plant at Temelin, Czechoslovakia, with that for the hypothetic nuclear power plant at Middletown, USA. For a reasonably adopted Czechoslovak crown/USD rate, the obtained costs for building the Temelin power plant are 50% higher than those for building the reference Middletown power plant. This compares rather favorably with the general level of investment costs in Czechoslovakia under the present economic conditions. The analysis performed shows that savings in investment costs should be sought in the fields of technological modernization of preparatory work and in all construction work, with the aim to reduce particularly live work. (P.A.). 12 tabs., 8 refs

  20. Industry plots nuclear revival

    International Nuclear Information System (INIS)

    Nogee, A.

    1984-01-01

    A successful revival of the nuclear power industry will require standardization and a reduction in the number of companies managing construction, according to Atomic Industrial Forum spokesmen. In describing the concept of a few superutilities to build nuclear plants, they emphasize the need for a nuclear culture among construction management. Future plant designs emphasize small scale, with design, engineering, licensing, financing, operator training, and paperwork completed before the sale. Utilities continue to pursue economy-of-scale despite the evidence that small-scale reactors can be economical and are more appropriate for fluctuating demand growth. Financiers want more say in construction plans in the future, while utilities want to establish generating subsidiaries for wholesale power sales

  1. Base isolation for nuclear power and nuclear material facilities

    International Nuclear Information System (INIS)

    Eidinger, J.M.; Kircher, C.A.; Vaidya, N.; Constantinou, M.; Kelly, J.M.; Seidensticker, R.; Tajirian, F.F.; Ovadia, D.

    1989-01-01

    This report serves to document the status of the practice for the use of base isolation systems in the design and construction of nuclear power and nuclear material facilities. The report first describes past and current (1989) applications of base isolation in nuclear facilities. The report then provides a brief discussion of non-nuclear applications. Finally, the report summarizes the status of known base-isolation codes and standards

  2. PWR plant construction in Japan

    International Nuclear Information System (INIS)

    Tamura, Toshifumi

    2002-01-01

    The construction methods based on the experiences on the Nuclear Island, which is a critical path in the total construction schedule, have been studied and reconsidered in order to construct by more reliable and economical method. So various improved construction method are being applied and the duration of construction is being reduced continuously. So various improved construction method are being applied and the duration of construction is being reduced continuously. In this paper, the history of construction of twenty-three (23) PWR Plant, the actual construction methods and schedule of Ohi-3/4, to which the many improved methods were applied during their construction, are introduced mainly with the improved points for previously constructed plants. And also the situation of construction method for the next PWR Plant is simply explained

  3. Discussion of manage mode for nuclear power construcation in China

    International Nuclear Information System (INIS)

    Gao Mingshi; Chen Hua

    2007-01-01

    This paper analyzed the development status of management mode for NPP construction and nuclear power engineering companies. Considering the national development plan of nuclear power, and making reference of the experiences of the successful construction of NPPs, the management mode for NPP construction in which the nuclear engineering companies are the main factors have been discussed. This paper proposed that EPC/TurnKey as the management mode for the nuclear power construction, led by the owner, and constructed by engineering companies according to the contracts, so as to establish a construction group with expertise knowledge. (authors)

  4. Computer integrated construction at AB building in reprocessing plant

    International Nuclear Information System (INIS)

    Takami, Masahiro; Azuchi, Takehiro; Sekiguchi, Kenji

    1999-01-01

    JNFL (Japan Nuclear Fuel Limited) is now processing with construction of the spent nuclear fuel reprocessing plant at Rokkasho Village in Aomori Prefecture, which is coming near to the busiest period of construction. Now we are trying to complete the civil work of AB Building and KA Building in a very short construction term by applying CIC (Computer Integrated Construction) concept, in spite of its hard construction conditions, such as the massive and complicated building structure, interferences with M and E (Mechanical and Electrical) work, severe winter weather, remote site location, etc. The key technologies of CIC are three-dimensional CAD, information network, and prefabrication and mechanization of site work. (author)

  5. Preparation and practice for nuclear power plant operation

    International Nuclear Information System (INIS)

    Wu Xuesong; Lu Tiezhong

    2015-01-01

    The operational preparation of the nuclear power plant is an important work in nuclear power plant production preparation. Due to the construction period of nuclear power plant from starting construction to production is as long as five years, the professional requirements of nuclear power operation are very strict, and the requirements for nuclear safety are also extremely high. Especially after the Fukushima accident, higher requirements for the safe operation of nuclear power plant are posed by competent authorities of the national level, regulatory authorities and each nuclear power groups. Based on the characteristics of the construction phase of nuclear power plant and in combination with engineering practice, this paper expounds the system established in the field of nuclear power plant operation and generally analyses the related management innovation. (authors)

  6. From the nuclear world

    International Nuclear Information System (INIS)

    Anon.

    2015-01-01

    This document gathers pieces of information concerning nuclear industry worldwide. The most relevant are the following ones. China has announced the construction between 2020 and 2025 of the biggest particle accelerator in the world. The Finn government has agreed with the project of a spent fuel storage center, it was the last administrative step before the launching of the construction works. The quality of the steel of the pressure vessel of the Olkiluoto EPR has been assessed by the Finn nuclear safety authority (STUK). The French nuclear safety authority (ASN) has launched a test program for assessing the resistance of the pressure vessel of the Flamanville EPR as a consequence of the recent discovery of defects in the composition of the steel. A robot called SX1 has been designed to measure radiation in a continuous way by strolling about in a nuclear facility. As a consequence of a tense relationship with Russia, the Turkish government has stopped the construction (by Rosatom) of the Akkuyu nuclear plant. The Belgian government and the Electrabel company have signed an agreement for a 10 year extension of the operating life of the Doel 1 and 2 reactors. Chinese authorities have approved the construction of 4 new third generation reactors. (A.C.)

  7. Improving construction performance

    International Nuclear Information System (INIS)

    1990-03-01

    Design for Constructability's overall purpose was to identify and address changes in the nuclear industry to restore nuclear energy as an attractive option for new generating capacity. As the centerpiece of project control, a comprehensive, stable schedule should organize the project logically to accomplish the project's objectives. A good schedule will: integrate the project team; serve as a communications tool to all members of the project team; and provide a means to monitor and measure project performance

  8. Modular construction approach for advanced nuclear plants

    International Nuclear Information System (INIS)

    Johnson, F.T.; Orr, R.S.; Boudreaux, C.P.

    1988-01-01

    Modular construction has been designated as one of the major features of the AP600 program, a small innovative 600-MW (electric) advanced light water reactor (ALWR) that is currently being developed by Westinghouse and its subcontractors. This program is sponsored by the US Department of Energy (DOE) in conjunction with several other DOE and Electric Power Research Institute ALWR programs. Two major objectives of the AP600 program are as follows: (1) to provide a cost of power competitive with other power generation alternatives; and (2) to provide a short construction schedule that can be met with a high degree of certainty. The AP600 plant addresses these objectives by providing a simplified plant design and an optimized plant arrangement that result in a significant reduction in the number and size of systems and components, minimizes the overall building volumes, and consequently reduces the required bulk quantities. However, only by adopting a modular construction approach for the AP600 can the full cost and schedule benefits be realized from the advances made in the plant systems design and plant arrangement. Modularization is instrumental in achieving both of the above objectives, but most of all, a total modularization approach is considered absolutely essential to ensure that an aggressive construction schedule can be met with a high degree of certainty

  9. Construction of an experimental simplified model for determining of flow parameters in chemical reactors, using nuclear techniques

    International Nuclear Information System (INIS)

    Araujo Paiva, J.A. de.

    1981-03-01

    The development of a simplified experimental model for investigation of nuclear techniques to determine the solid phase parameters in gas-solid flows is presented. A method for the measurement of the solid phase residence time inside a chemical reactor of the type utilised in the cracking process of catalytic fluids is described. An appropriate radioactive labelling technique of the solid phase and the construction of an eletronic timing circuit were the principal stages in the definition of measurement technique. (Author) [pt

  10. The law for the regulations of nuclear source materials, nuclear fuel materials and reactors

    International Nuclear Information System (INIS)

    1987-01-01

    General provisions specify the purpose of the Law and definitions of terms used in it. Provisions relating to control of business management for refining cover designation of business operation, requirements for designation, permission and report of alteration, report of commencement of business operation, revocation of designation, recording, and measures for wastes. Provisions relating to control of business management for processing cover permission of operation, requirements for permission, approval of design and construction plan, inspection of facilities, report of commencement of business management, measures for maintenance, suspension of use of facilities, responsible personnel for handling nuclear fuel, and permit, obligations, etc. of responsible personnel for handing nuclear fuel. Provisions relating to control of construction and operation of nuclear reactor cover permission of construction, permission concerning nuclear reactor mounted on foreign nuclear powered ships, requirements for permission, etc. Other articles stipulate provisions relating to control of business management for reprocessing, use of nuclear fuel substances, use of materials and substances covered by international regulations, designation of inspection organizations, and other rules. (Nogami, K.)

  11. Limitation of radioactive excursions by the containment construction

    International Nuclear Information System (INIS)

    Janssen, L.G.J.

    1987-01-01

    The last barrier against the spread of fission products into the environment consists, in nuclear power plants, of the containment construction or safety enclosure. A brief survey of the influence of such an enclosure on the safety of a nuclear power plant is outlined for the various containment constructions for light-water reactors. Also the possibilities of failure of these constructions are discussed and some processes are described which can contribute effectively on the quantity of fission products that can be spread into the environment in case of a reactor accident. (Auth.)

  12. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    1998-01-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1997 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1997; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; forecasts; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  13. Nuclear power in the United States

    International Nuclear Information System (INIS)

    Johnston, J.B.

    1985-01-01

    All over the world except in the United States, nuclear energy is a low cost, secure, environmentally acceptable form of energy. In the United States, civilian nuclear power is dead. 112 nuclear power plants have been abandoned or cancelled in the last decade, and there has been no new order for nuclear plants since 1978. It will be fortunate to have 125 operating nuclear plants in the United States in the year 2000. There are almost 90 completed nuclear power plants and about 45 under construction in the United States, but several of those under construction will eventually be abandoned. About 20 % of the electricity in the United States will be generated by nuclear plants in 2000 as compared with 13 % supplied in the last year. Under the present regulatory and institutional arrangement, American electric utilities would not consider to order a new nuclear power plant. Post-TMI nuclear plants became very expensive, and there is also ideological opposition to nuclear power. Coal-firing plants are also in the similar situation. The uncertainty about electric power demand, the cost of money, the inflation of construction cost and regulation caused the situation. (Kako, I.)

  14. Development of nuclear powered ship in Japan

    International Nuclear Information System (INIS)

    Sato, Hiroshi

    1976-01-01

    The development of nuclear merchant ship in Japan was started in 1955 by the establishment of Nuclear Ship Study Group, and since then, the investigation, test and research on nuclear ships have been continued. As a result, a nuclear ocean observation and supply ship was designed for trial. Researches were carried out also in JAERI and Institute for Technical Research of Ships. Meanwhile, the nuclear icebreaker Lenin was completed in Soviet Union in 1959, the nuclear ship Savannah set out for maiden voyage in U.S. in 1962, and the construction of the nuclear ore carrier Otto Hahn was prepared in FRG. Japan Nuclear Ship Development Corp. was established in 1963, and started the design and construction of the first nuclear ship in Japan, Mutsu. The basic policy in the construction is the improvement of nuclear ship technology, the securing of safety, and the use of domestic technologies as far as possible. The progress of the design, construction and test of the Mutsu is described. Owing to the problem of radiation leak, the development of nuclear ships stagnated for a while, but the nuclear plant of the Mutsu demonstrated the expected performance in the functional test, land criticality test and zero output test, and it is expected that the bud of the independent development brought up so far can bear valuable fruit. The independent development of marine nuclear reactors should be continued by selecting the way most suitable to Japan. (Kako, I.)

  15. Nuclear power in Europe

    International Nuclear Information System (INIS)

    Perera, J.

    2000-01-01

    Currently nuclear power accounts for more than 25% of total electricity production in Europe (including Eastern Europe and the former Soviet Union) However, significant new construction is planned in Central and Eastern Europe only, apart from some in France and, possibly in Finland. Many countries in Western Europe have put nuclear construction plans on hold and several have cancelled their nuclear programs. This report looks at the history of nuclear power and its current status in both Eastern and Western Europe. It provides an outline of nuclear fuel cycle facilities, from uranium procurement to final waste disposal. Economic and environmental issues are discussed, as well as the prospect of increased East-West trade and cooperation in the new poso-cold war world. Detailed profiles are provided of all the countries in Western Europe with significant nuclear power programs, as well as profiles of major energy and nuclear companies

  16. The basic discussion on nuclear power safety improvement based on nuclear equipment design

    International Nuclear Information System (INIS)

    Zhao Feiyun; Yao Yangui; Yu Hao; He Yinbiao; Gao Lei; Yao Weida

    2013-01-01

    The safety of strengthening nuclear power design was described based on nuclear equipment design after Fukushima nuclear accident. From these aspects, such as advanced standard system, advanced design method, suitable test means, consideration of beyond design basis event, and nuclear safety culture construction, the importance of nuclear safety improvement was emphatically presented. The enlightenment was given to nuclear power designer. (authors)

  17. Safety evaluation report related to the construction of Skagit/Hanford Nuclear Project, Units 1 and 2. Docket Nos. STN 50-522 and 50-523

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement 3 to the Safety Evaluation Report for the application filed by Puget Sound Power and Light Company on behalf of itself, the Pacific Power and Light Company, The Washington Water Power Company, and the Portland General Electric Company for construction permits to build the Skagit/Hanford Nuclear Project has been issued by the Office of Nuclear Reactor Regulation of the United States Nuclear Regulatory Commission. This supplement is an evaluation of the site relocation amendment to the Preliminary Safety Analysis Report. The proposed site has been relocated from Skagit County, Washington, to the Department of Energy's Hanford Reservation

  18. Improvements in the construction of nuclear power plant

    International Nuclear Information System (INIS)

    1990-01-01

    This paper outlines activities to minimize the amount of work at a construction site by employing installation method with large size blocks and shop-assembled units, improvement in facilities such as mechanization of welding and huge roof cover which enables work in all weather conditions, and administration systems using computer for the work activity control as well as quality and progress control for construction work. These improvements are only achieved when supported by related system improvements at the design and fabrication stage, and these improvements contributed a great deal to the quality assurance and the shorter construction period. (author)

  19. Construction of sustainability indicators for Nuclear Area Innovation and Research Institutes in Brazil; Construção de indicadores de sustentabilidade para institutos de pesquisa e inovação da área de tecnologia nuclear no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Simone Fonseca

    2017-07-01

    The dissertation consists of a construction of appropriate sustainability indicators for nuclear area innovation and research institutes in Brazil. In order to do so, the results of the construction process, as well as, the perception of the population that resides in the area surrounding this type of institute are presented and discussed. As reference for this case study, the Nuclear Technology Development Center (CDTN) was chosen. It is located in Pampulha, more specifically, on the campus of the Federal University of Minas Gerais (UFMG), Belo Horizonte, MG, Brazil. One of the methodological processes present in this research is the Delphi method, because it is the most used in the construction of indicators. Its application in this work allowed obtaining the of specialist group opinions collected through a questionnaire. Initially, sixty-nine sustainability indicators were considered. They were distributed among the environmental, economic, socio cultural and institutional dimensions, some of which were obtained through lists of indicators pointed by literature review. Other indicators were built through discussions with groups from the nuclear, environmental, economic and socio cultural areas. Among the set of indicators investigated, twenty-six were selected as being the most relevant. A questionnaire was then applied to one hundred and twenty individuals living in the vicinity of the CDTN. Discrepancies were found during the analysis the opinions of the experts in relation to sustainability dimensions proposed, as well as, indicators of the same dimensions were varied. However, the opinion of the population and the opinion of the experts had similar results. Finally, this study is the first proposal for the nuclear sector to construct this kind of indicator that takes into account the evaluation of experts and the opinion of the community that resides around these institutions. (author)

  20. Nuclear power in the Soviet Bloc

    International Nuclear Information System (INIS)

    Davey, W.G.

    1982-03-01

    The growth of Soviet Bloc nuclear power generation to the end of the century is evaluated on the basis of policy statements of objectives, past and current nuclear power plant construction, and trends in the potential for future construction. Central to this study is a detailed examination of individual reactor construction and site development that provides specific performance data not given elsewhere. A major commitment to nuclear power is abundantly clear and an expansion of ten times in nuclear electric generation is estimated between 1980 and 2000. This rate of growth is likely to have significant impact upon the total energy economy of the Soviet Bloc including lessening demands for use of coal, oil, and gas for electricity generation

  1. Nuclear power in the Soviet Bloc

    Energy Technology Data Exchange (ETDEWEB)

    Davey, W.G.

    1982-03-01

    The growth of Soviet Bloc nuclear power generation to the end of the century is evaluated on the basis of policy statements of objectives, past and current nuclear power plant construction, and trends in the potential for future construction. Central to this study is a detailed examination of individual reactor construction and site development that provides specific performance data not given elsewhere. A major commitment to nuclear power is abundantly clear and an expansion of ten times in nuclear electric generation is estimated between 1980 and 2000. This rate of growth is likely to have significant impact upon the total energy economy of the Soviet Bloc including lessening demands for use of coal, oil, and gas for electricity generation.

  2. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  3. The codification of the design and construction rules in nuclear industry ensuring its success in France and for French export activity

    International Nuclear Information System (INIS)

    Boiron, P.; Menjon, G.

    1980-10-01

    The codification of the design and construction rules (DCR) for nuclear power stations is presented. In part I, The DCR codifying undertaking is explained. In part II, the DCR-M is presented as is also the significant change that its application entails in contractual practice and the application of the regulations [fr

  4. Effect of construction of Dukovany nuclear power plant on development of organizational structure of Prumyslove Stavby Brno

    International Nuclear Information System (INIS)

    Miks, L.

    1985-01-01

    Prumyslove stavby was set up in 1969 and its structure has undergone considerable changes. No major changes were made during the pre-production stage and in the construction preparation period (1969-77). With increased building work volume the organizational structure expanded: new units, such as building site plants, etc., were opened. The current period is characterized by gradual reduction in production capacity, mainly in units providing special jobs. All production units will be closed down with the termination of the nuclear power plant in 1987. (Pu)

  5. A primer on the Bataan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gonzales, S.R.

    This article explains in simple terms about nuclear energy, nuclear research and power reactor and its operations. It gives the historical background of the presently being constructed Philippine Nuclear Power Plant (PNPP-I) at Napot Point, Bataan. Because of rising opposition to its construction aggravated by the TMI accident, the author tries to explain and convince those against nuclear power that the reactor will be safe within reasonable risk as deduced from testimonies of experts involved in the construction and later in its operation. (author)

  6. An N-terminal nuclear localization sequence but not the calmodulin-binding domain mediates nuclear localization of nucleomorphin, a protein that regulates nuclear number in Dictyostelium

    International Nuclear Information System (INIS)

    Myre, Michael A.; O'Day, Danton H.

    2005-01-01

    Nucleomorphin is a novel nuclear calmodulin (CaM)-binding protein (CaMBP) containing an extensive DEED (glu/asp repeat) domain that regulates nuclear number. GFP-constructs of the 38 kDa NumA1 isoform localize as intranuclear patches adjacent to the inner nuclear membrane. The translocation of CaMBPs into nuclei has previously been shown by others to be mediated by both classic nuclear localization sequences (NLSs) and CaM-binding domains (CaMBDs). Here we show that NumA1 possesses a CaMBD ( 171 EDVSRFIKGKLLQKQQKIYKDLERF 195 ) containing both calcium-dependent-binding motifs and an IQ-like motif for calcium-independent binding. GFP-constructs containing only NumA1 residues 1-129, lacking the DEED and CaMBDs, still localized as patches at the internal periphery of nuclei thus ruling out a direct role for the CaMBD in nuclear import. These constructs contained the amino acid residues 48 KKSYQDPEIIAHSRPRK 64 that include both a putative bipartite and classical NLS. GFP-bipartite NLS constructs localized uniformly within nuclei but not as patches. As with previous work, removal of the DEED domain resulted in highly multinucleate cells. However as shown here, multinuclearity only occurred when the NLS was present allowing the protein to enter nuclei. Site-directed mutation analysis in which the NLS was changed to 48 EF 49 abolished the stability of the GFP fusion at the protein but not RNA level preventing subcellular analyses. Cells transfected with the 48 EF 49 construct exhibited slowed growth when compared to parental AX3 cells and other GFP-NumA1 deletion mutants. In addition to identifying an NLS that is sufficient for nuclear translocation of nucleomorphin and ruling out CaM-binding in this event, this work shows that the nuclear localization of NumA1 is crucial to its ability to regulate nuclear number in Dictyostelium

  7. Nuclear recession

    International Nuclear Information System (INIS)

    Speth, G.

    1978-01-01

    The private sector's growing doubts about nuclear power plants, as reflected in the decline in new orders and the number of rescinded orders, will result in an estimated total of under 300 nuclear power plants by the year 2000 rather than the 1200 to 1500 that were projected several years ago. The decline is a result of construction and equipment costs and a lower operating efficiency than anticipated. The growth of electricity demand also declined after 1974 and, although it is increasing again, there are concerns about future growth rates. Besides its noncompetitive position relative to coal, nuclear plant construction suffers from restrictive policies based on the uncertainties of safety, security, waste disposal, and proliferation. Unless these problems can be resolved, many consider nuclear power to be an impractical option as an energy source. The Council on Environmental Quality supports policies that will permit further nuclear or coal development only after a clear demonstration of technical and institutional capacity to handle these problems. A commitment to solar technology is urged

  8. China general nuclear power corporation--The recent research and application of the modular technology in nuclear power engineering

    International Nuclear Information System (INIS)

    Lu Qinwu

    2014-01-01

    Modular design and construction is one of the distinctive features of the 3"r"d generation nuclear power technology. In order to promote the technological innovations in nuclear power engineering design and construction and develop the self-owned modular technology, China General Nuclear Power Corporation (CGN) has carried out the R and D and application of the modular technology based on the CPR1000-type nuclear power plants, and has made the national-level achievements in the establishment of modular design technology system, development of 3D modular design system and application of modular construction of containment steel liner in the demonstration projects. (author)

  9. Construction strategies and lifetime uncertainties for nuclear projects: A real option analysis

    International Nuclear Information System (INIS)

    Jain, Shashi; Roelofs, Ferry; Oosterlee, Cornelis W.

    2013-01-01

    Highlights: • Real options can be used to value flexibility of modular reactors. • Value of NPPs increases with implementation of long term cost reductions. • Levels of uncertainties affect the choice between projects. -- Abstract: Small and medium sized reactors, SMRs (according to IAEA, ‘small’ are reactors with power less than 300 MWe, and ‘medium’ with power less than 700 MWe) are considered as an attractive option for investment in nuclear power plants. SMRs may benefit from flexibility of investment, reduced upfront expenditure, and easy integration with small sized grids. Large reactors on the other hand have been an attractive option due to economy of scale. In this paper we focus on the advantages of flexibility due to modular construction of SMRs. Using real option analysis (ROA) we help a utility determine the value of sequential modular SMRs. Numerical results under different considerations, like possibility of rare events, learning, uncertain lifetimes are reported for a single large unit and modular SMRs

  10. Construction strategies and lifetime uncertainties for nuclear projects: A real option analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jain, Shashi, E-mail: s.jain@cwi.nl [TU Delft, Delft Institute of Applied Mathematics, Delft (Netherlands); Nuclear Research Group, Petten (Netherlands); Roelofs, Ferry, E-mail: roelofs@nrg.eu [Nuclear Research Group, Petten (Netherlands); Oosterlee, Cornelis W., E-mail: c.w.oosterlee@cwi.nl [CWI – Centrum Wiskunde and Informatica, Amsterdam (Netherlands); TU Delft, Delft Institute of Applied Mathematics, Delft (Netherlands)

    2013-12-15

    Highlights: • Real options can be used to value flexibility of modular reactors. • Value of NPPs increases with implementation of long term cost reductions. • Levels of uncertainties affect the choice between projects. -- Abstract: Small and medium sized reactors, SMRs (according to IAEA, ‘small’ are reactors with power less than 300 MWe, and ‘medium’ with power less than 700 MWe) are considered as an attractive option for investment in nuclear power plants. SMRs may benefit from flexibility of investment, reduced upfront expenditure, and easy integration with small sized grids. Large reactors on the other hand have been an attractive option due to economy of scale. In this paper we focus on the advantages of flexibility due to modular construction of SMRs. Using real option analysis (ROA) we help a utility determine the value of sequential modular SMRs. Numerical results under different considerations, like possibility of rare events, learning, uncertain lifetimes are reported for a single large unit and modular SMRs.

  11. JHR. A high performance MTR under construction for a sustainable nuclear energy

    International Nuclear Information System (INIS)

    Iracane, Daniel; Cordier, Pierre-Yves

    2009-01-01

    The Access to an up-to-date Material Testing Reactor (MTR) is essential to support a sustainable nuclear energy, meeting industry and public needs, and keeping a high level of scientific expertise. This includes services to existing and coming reactor technologies for major stakes such as safety and competitiveness, lifetime management, operation optimization, development of innovative structural material and fuel required for future systems (innovative Gen III, Gen IV, fusion...), etc. The JHR copes with this context. Design phase has been completed by the end of 2005 and JHR is now under construction. Start of operation is scheduled in 2014. As a new MTR taking benefit of a large available worldwide experience, JHR offers new major experimental capability that will be presented. JHR will be operated within an international users' consortium that will guarantee effective and cost-effective operation. This innovative way to operate a MTR, as a user-facility for the benefit of industry and public bodies, will be presented. (author)

  12. Nuclear energy data 2010

    CERN Document Server

    2010-01-01

    This 2010 edition of Nuclear Energy Data , the OECD Nuclear Energy Agency's annual compilation of official statistics and country reports on nuclear energy, provides key information on plans for new nuclear plant construction, nuclear fuel cycle developments as well as current and projected nuclear generating capacity to 2035 in OECD member countries. This comprehensive overview provides authoritative information for policy makers, experts and other interested stakeholders.

  13. Socio-economic impacts of nuclear generating stations: Arkansas Nuclear One Station case study

    International Nuclear Information System (INIS)

    Pijawka, K.D.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Arkansas Nuclear One nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  14. Present status of nuclear containments in Korea

    International Nuclear Information System (INIS)

    Park, Jihong; Hong, Jaekeun; Lee, Byunghoon; Son, Youngho

    2007-01-01

    Since the first nuclear power plant in Korea, Kori unit no.1, was started in commercial service in 1978, 20 units including Kori unit no.1 have been operated and maintained until now in Korea. Recently several units were started to be constructed and also, additionally more than 4 units were planned to be constructed in the near future. The importance of nuclear containments has been always one of the hottest issues for the safety and protection of nuclear power plants until now. At the beginning of nuclear power plants construction in Korea, several typed nuclear containment systems were adopted. For those reasons, various codes, standards, and inspection technologies are applied to nuclear containment systems differently. In this study, the status of inservice inspection performed for the safety and maintenance of nuclear containments in Korea was researched. Overall nuclear containment systems and inspections performed up to recently in Korea including trends, inspection items, periods, and regulations were described briefly. (author)

  15. Nuclear law and environmental law in the licensing of nuclear installations

    International Nuclear Information System (INIS)

    Raetzke, Christian

    2013-01-01

    Large nuclear installations can have a considerable impact on the environment, both in actual terms, due to the construction and operation of the plant and in potential terms, related to the risk of an accident. A considerable part of the multiple authorisation processes required to develop a large nuclear project is devoted to addressing the possible impact on the environment. Accordingly, environmental protection is not only warranted by requirements and processes arising out of what is generally considered 'environmental law', but also by laws governing the design, siting, construction and operation of nuclear installations. By ensuring prevention and control of radiation releases to the environment, the aspects of nuclear law governing the design, construction, operation and decommissioning of nuclear facilities pertain to the field of environmental protection just like other fields of environmental law. The perception of the public that nuclear energy is 'anti-environmental' and the generally antinuclear stance of environmental non-governmental organisations (NGOs) should not deflect attention from the fact that protection of the environment is one of the main functions of the body of nuclear law. In this article, the general relationship between the law governing civil nuclear installations and environmental law will be analysed. The subsequent chapters will deal with environmental requirements and procedures as part of the authorisation process for a nuclear installation. The role of public participation and the involvement of neighbouring states in the licensing process will also be investigated, as they are today mainly based on environmental law. Some other aspects which may also have some relation to environmental protection, such as waste management, emergency planning, multinational early notification and assistance in the case of an accident and nuclear liability, have been omitted from discussion as they lie outside the focus of this article

  16. France and nuclear proliferation: the new generation of nuclear submarines

    International Nuclear Information System (INIS)

    Barrillot, B.

    2001-01-01

    Ten years after the end of the 'cold war' the French government has pursued its national defense program with the construction of a new generation of nuclear submarines with new type of missiles and nuclear heads. This book analyzes the possible solutions for a step by step elimination of nuclear weapons from the French weapons stock. (J.S.)

  17. Financing aspects of nuclear power plant construction under Polish economic conditions

    International Nuclear Information System (INIS)

    Besant-Jones, John E.

    1999-01-01

    Within the framework of the new Polish Energy Law the different issues important far financing a programme to develop nuclear power power in Poland such as: economic competitiveness of nuclear power, financing options for nuclear power projects, managing the various risks for financing nuclear power as well as nuclear and business liability are considered. The importance of policy issues is stressed

  18. Fair chance required for nuclear power. Plea of the European Nuclear Industry

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The first Euroatom European nuclear conference was held in Brussels on November 25/26, 2004 was attended by more than 250 renowned experts, including more than 20 managers of the board from a dozen European countries. They all agreed that the construction of new nuclear power plants will depend on the public opinion, i.e. it will be a political and communication problem rather than a technical problem. A swing of public opinion is difficult as rational arguments do not apply when emotions are high. The economic efficiency of nuclear power was proved again by the new reactor constructed in Finland. (orig.)

  19. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  20. Development of the national nuclear programme and preparations for the introduction of nuclear power in Hungary

    International Nuclear Information System (INIS)

    Szili, G.; Erdosi, N.; Varga, I.; Ocsai, M.; Szabo, B.

    1977-01-01

    Hungary's energy situation, energy policy and its interest in the use of nuclear energy are reviewed and the main nuclear power programme targets for the medium term (by 1990) and long term (by 2000) are given. Preparatory steps for the introduction of nuclear energy are outlined, emphasizing the important areas of the preparatory programme. A short technical description is given of Hungary's first nuclear power plant, the Paks Nuclear Power Station, including the preparations for construction and erection, the present construction plan, fuel supply, basic technical aspects of safety, and the social consequences of the plant's erection. The problems involved in the introduction of nuclear energy that must be solved by the state administration are summarized. A review is given of earlier legislation on projects and works representing a radiation hazard; duties are discharged by different state administrations. Additional problems arise from the large-scale use of nuclear energy. These require regulation by the authorities. Preliminary steps have been taken to frame appropriate laws. The activities of the authorities in regard to the practical realization of the first nuclear power station are outlined: there will be a scheduled procedure of authorization. The present potentials and trends in the development and design capacities for energy in general and particularly for nuclear power research are discussed. Hungarian R and D and design resources participate in the joint nuclear power development programme of the CMEA countries. Work is divided amongst various institutes. Preparations being made in the manufacturing, building and construction industries will lead to an expected increase in the domestic share in the construction of future nuclear power plants, compared to the first plant, for which the proportions of foreign and domestic participation are given. Hungary's industry is preparing for the manufacture of nuclear power equipment within the framework of the

  1. A Systems Engineering Framework for Design, Construction and Operation of the Next Generation Nuclear Plant

    International Nuclear Information System (INIS)

    Edward J. Gorski; Charles V. Park; Finis H. Southworth

    2004-01-01

    Not since the International Space Station has a project of such wide participation been proposed for the United States. Ten countries, the European Union, universities, Department of Energy (DOE) laboratories, and industry will participate in the research and development, design, construction and/or operation of the fourth generation of nuclear power plants with a demonstration reactor to be built at a DOE site and operational by the middle of the next decade. This reactor will be like no other. The Next Generation Nuclear Plant (NGNP) will be passively safe, economical, highly efficient, modular, proliferation resistant, and sustainable. In addition to electrical generation, the NGNP will demonstrate efficient and cost effective generation of hydrogen to support the President's Hydrogen Initiative. To effectively manage this multi-organizational and technologically complex project, systems engineering techniques and processes will be used extensively to ensure delivery of the final product. The technological and organizational challenges are complex. Research and development activities are required, material standards require development, hydrogen production, storage and infrastructure requirements are not well developed, and the Nuclear Regulatory Commission may further define risk-informed/performance-based approach to licensing. Detailed design and development will be challenged by the vast cultural and institutional differences across the participants. Systems engineering processes must bring the technological and organizational complexity together to ensure successful product delivery. This paper will define the framework for application of systems engineering to this $1.5B - $1.9B project

  2. Nuclear power plants in the world - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. These data come from the IAEA's PRIS and AREVA-CEA's GAIA databases. The following aspects are reviewed: 2009 highlights, Main characteristics of reactor types, Map of the French nuclear power plants on 2010/01/01, Worldwide status of nuclear power plants (12/31/2009), Units distributed by countries, Nuclear power plants connected to the Grid- by reactor type groups, Nuclear power plants under construction on 2009, Evolution of nuclear power plants capacities connected to the grid, First electric generations supplied by a nuclear unit in each country, Electrical generation from nuclear power plants by country at the end 2009, Performance indicator of french PWR units, Evolution of the generation indicators worldwide by type, Nuclear operator ranking according to their installed capacity, Units connected to the grid by countries at 12/31/2009, Status of licence renewal applications in USA, Nuclear power plants under construction at 12/31/2009, Shutdown reactors, Exported nuclear capacity in net MWe, Exported and national nuclear capacity connected to the grid, Exported nuclear power plants under construction, Exported and national nuclear capacity under construction, Nuclear power plants ordered at 12/31/2009, Long term shutdown units at 12/31/2009, COL applications in the USA, Recycling of Plutonium in reactors and experiences, Mox licence plants projects, Appendix - historical development, Meaning of the used acronyms, Glossary

  3. Geologic studies on the Rio Una region (Iguape - Sao Paulo County), Brazil, for the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Hassano, S.; Mueller, M.; Stein, J.H.

    1984-01-01

    The main objective of the project was the geological and seismological characterization of 230 Km 2 along the coastal region between the Barro Branco and Jureia massifs in order to pinpoint one or more local areas showing adequate geological, morphological and geotechnical conditions suitable for construction of nuclear power plants. Results of the investigations, as well as the methodology used for determination of main interesting areas are presented. The best areas for construction are believed to be situated along the coast where Precambrian basement rocks crop out close to the shoreline. The Tertiary-Quaternary sedimentary cover reaches a thickness of 50 or more meters and the character of the sediments does not allow direct emplacement of foundations for heavy-weight constructions. Historical analysis of seismic activity of the region, as well as the study of faults and fracture zones identified in the area demonstrate the absence of active faults such as defined by internationally accepted safety criteria. (Author) [pt

  4. Advance in technologies of electric power in 2008

    International Nuclear Information System (INIS)

    Hamada, Kenichi; Maekawa, Fumiaki; Nakamura, Akio

    2008-01-01

    Ten electric power companies and two related companies reported their advance in technologies. The technologies of nuclear power plants were stated by ten companies, which consisted of introduction of new main control board to Tomari-3 in Hokkaido Electric Power Co., Inc., reduction methods of exposure dose of Higashidori-1 in Tohoku Electric Power, hot water based two-phase flow testing device for pipe thinning test by Tokyo Electric Power Company, Guideline for prevention of piping damage caused by combustion of mixture gases in BWR (the second edition) published by Thermal and Nuclear Power Engineering Society, setting up distributor in the low-pressure turbine of Shika-2 in Hokuriku Electric Power Company, development of rapid estimation method of release radioactivity and application of high density neutron source to nuclear transmutation of nuclear fuel cycle and introduction of new core monitor system by The Kansai Electric Power Co., Inc., upgrade of investigation of the effects of hot waste water and development of detector for dropout parts of cooling system in reactor by Shikoku Electric Power Co., Inc., change of transformer in Sendai-1 by Kyushu Electric Power Co., Inc., and reactor core design for Oma ABWR by J-Power. The Japan Atomic Power Company reported four articles such as development of technologies for established nuclear power plants, promotion of Tsuruga-3 and Tsuruga-4, application of clearance system in Japan and development of future reactors. (S.Y.)

  5. Steel construction in the nuclear reprocessing industry

    International Nuclear Information System (INIS)

    Jordan, G.W.

    1990-01-01

    Over the past decade British Nuclear Fuels plc (BNFL) has pursued a large capital expenditure programme at Sellafield in Cumbria. This has used large quantities of structural steelwork. For example, Thorp plant for reprocessing spend AGR and LWR fuels, due for completion in 1992, has 20,000 tonnes. The design of these plants has been entrusted to BNFL Engineering based at Risley near Warrington, England. These safety-related structures are designed, as required by the Nuclear Installations Inspectorate, to withstand the effects of environmental hazards such as extremes of earthquake, wind, temperature, ice, snow, flooding, and lightning strikes. In some cases they may be subjected to impact loading from possible mishandling of lifted loads such as fuel transportation flasks. Design criteria for these structures have been developed by BNFL Engineering. Some examples are mentioned. (author)

  6. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2003-01-01

    This 2003 version of Elecnuc contents information, data and charts on the nuclear power plants in the world and general information on the national perspectives concerning the electric power industry. The following topics are presented: 2002 highlights; characteristics of main reactor types and on order; map of the French nuclear power plants; the worldwide status of nuclear power plants on 2002/12/3; units distributed by countries; nuclear power plants connected to the Grid by reactor type groups; nuclear power plants under construction; capacity of the nuclear power plants on the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear plants by country at the end 2002; performance indicator of french PWR units; trends of the generation indicator worldwide from 1960 to 2002; 2002 cumulative Load Factor by owners; nuclear power plants connected to the grid by countries; status of license renewal applications in Usa; nuclear power plants under construction; Shutdown nuclear power plants; exported nuclear power plants by type; exported nuclear power plants by countries; nuclear power plants under construction or order; steam generator replacements; recycling of Plutonium in LWR; projects of MOX fuel use in reactors; electricity needs of Germany, Belgium, Spain, Finland, United Kingdom; electricity indicators of the five countries. (A.L.B.)

  7. Economics of nuclear electricity

    International Nuclear Information System (INIS)

    Frederick, G.

    1997-01-01

    On the sites of Tihange and Doel in Belgium, a total of seven nuclear generating units with an aggregate installed power of 5807 MWe are operated. Construction of another unit at Doel was postponed indefinitely in 1988 after the Chernobyl accident. Electrabel holds a 25% interest in the Chooz B-1 and B-2 nuclear generating units under construction in France near the Belgian border. In terms of gross installed nuclear generating capacity worldwide, Belgium holds twelfth place; when ranked according to the contribution to public electricity supply, the country holds third place with a 57% share. Before decisions are taken about future nuclear power plants, above all the fuel costs of gas-fired cogeneration plants and the capital costs of nuclear power plants must be weighed. Current evaluation of all costs shows the use of nuclear power for electricity generation to be ten percent more expensive than that of natural gas. However, those responsible in the power supply industry feel that this short-term competitive situation is only one factor out of many others, such as safety issues, diversification in sourcing and deliveries, climatic influences, and employment. The development and construction of advanced reactors will result in the desired cost reduction and lead to a new era of nuclear power, also in Europe. (orig.) [de

  8. Constructability - from Qinshan to the ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.; Ricciuti, R.

    2003-01-01

    AECL has recognised the importance of Constructability for many years and is applying its principals to CANDU projects with increasing success. Constructability is defined as the consideration of construction knowledge and experience during all phases of a project, and recognizes that maximum benefit can be achieved during the concept phases of a project. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years, however, the last two units being completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project costs and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building, using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project. This paper describes the latest construction methods used successfully on the Qinshan CANDU 6 project and looks at the extensive implementation of similar methods for ACR. It is concluded, based on the Qinshan success, that the ACR construction schedule is readily achievable. (author)

  9. Ground assessment methods for nuclear power plant

    International Nuclear Information System (INIS)

    1985-01-01

    It is needless to say that nuclear power plant must be constructed on the most stable and safe ground. Reliable assessment method is required for the purpose. The Ground Integrity Sub-committee of the Committee of Civil Engineering of Nuclear Power Plant started five working groups, the purpose of which is to systematize the assessment procedures including geological survey, ground examination and construction design. The works of working groups are to establishing assessment method of activities of faults, standardizing the rock classification method, standardizing assessment and indication method of ground properties, standardizing test methods and establishing the application standard for design and construction. Flow diagrams for the procedures of geological survey, for the investigation on fault activities and ground properties of area where nuclear reactor and important outdoor equipments are scheduled to construct, were established. And further, flow diagrams for applying investigated results to design and construction of plant, and for determining procedure of liquidification nature of ground etc. were also established. These systematized and standardized methods of investigation are expected to yield reliable data for assessment of construction site of nuclear power plant and lead to the safety of construction and operation in the future. In addition, the execution of these systematized and detailed preliminary investigation for determining the construction site of nuclear power plant will make much contribution for obtaining nation-wide understanding and faith for the project. (Ishimitsu, A.)

  10. U.S. nuclear industry

    International Nuclear Information System (INIS)

    Sherman, R.

    1979-01-01

    At present, 72 power reactors are in the condition of being able to operate in U.S., and the total installation capacity has reached 55 million kW, which is equivalent to about 9.5% of the total power generation capacity in U.S. The nuclear power stations produced 12.5% of the total electricity consumption in 1978. Especially in the north eastern part of the U.S., the nuclear power generation occupied 42% of the total power generation at the time of recent peak load, and 47 million barrels of crude oil and 517 million dollars of foreign currency were able to be saved. Moreover, 96 plants amounting to 105 million kW are under construction, and 30 plants of 35 million kW were ordered. Electric power companies, nuclear reactor makers, nuclear fuel and other related industries believe the merits of nuclear power generation and expect that it will flourish if a certain problem is solved. Especially serious problem to which the U.S. nuclear industry is facing now is the problem of uncertainty. Many orders of nuclear power plants have been canceled, and the constructions have been postponed. The capability of the U.S. nuclear industry to construct more than the required facilities, and its extent and the necessary conditions have been investigated by the Atomic Industrial Forum. The important national and international problems of atomic energy are discussed. (Kako, I.)

  11. China's nuclear safety regulatory body: The national nuclear safety administration

    International Nuclear Information System (INIS)

    Zhang Shiguan

    1991-04-01

    The establishment of an independent nuclear safety regulatory body is necessary for ensuring the safety of nuclear installations and nuclear fuel. Therefore the National Nuclear Safety Administration was established by the state. The aim, purpose, organization structure and main tasks of the Administration are presented. At the same time the practical examples, such as nuclear safety regulation on the Qinshan Nuclear Power Plant, safety review and inspections for the Daya Bay Nuclear Power Plant during the construction, and nuclear material accounting and management system in the nuclear fuel fabrication plant in China, are given in order to demonstrate the important roles having been played on nuclear safety by the Administration after its founding

  12. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  13. Nuclear awaits 1994

    International Nuclear Information System (INIS)

    Collier, J.G.

    1992-01-01

    When the UK electricity industry was privatised, the Government stated that in 1994 it would undertake a review of the prospects for nuclear power. The future role of nuclear power will be viewed against the improved performance of the nuclear utilities; the success being achieved on the construction of Sizewell B; and the economics taking into account environmental benefits. The chairman of Nuclear Electric reviews the current position of Nuclear Power in Britain and puts the case for nuclear power in the future. (author)

  14. The Nuclear Review: the Institution of Nuclear Engineers' response to the Review of Nuclear Power

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The United Kingdom Government's Nuclear Review currently underway, addresses whether and in what form nuclear power should continue to be part of the country's power generation capability. This article sets out the response of the Institution of Nuclear Engineers to the Nuclear Review. This pro-nuclear group emphasises the benefits to be gained from diversity of generation in the energy supply industry. The environmentally benign nature of nuclear power is emphasised, in terms of gaseous emissions. The industry's excellent safety record also argues in favour of nuclear power. Finally, as power demand increases globally, a health U.K. nuclear industry could generate British wealth through power exports and via the construction industry. The Institution's view on radioactive waste management is also set out. (UK)

  15. Hitachi's experience and achievements in ABWR construction

    International Nuclear Information System (INIS)

    Inoue, Takashi; Miura, Jun; Murayama, Kouichi

    2003-01-01

    Hitachi, Ltd. (Hitachi) is taking charge of the turbine island of Chubu Electric Power Company's Hamaoka nuclear power plant Unit No. 5 (Hamaoka 5), and all facilities of Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2). Hitachi has achieved shorter schedules and lower costs in the two projects with the following construction methods. First, Hitachi applied modularization and the area-by-area method. These methods enable us to undertake building and installation work in parallel. Second, the floor packaging construction method enables us to finish installation in every area earlier than conventional methods. Moreover, manpower can be distributed evenly. This paper reports the application of these advanced construction methods to the Hamaoka 5 and Shika 2 projects. Installations such as RCCV modules and condenser blocks are presented in this paper. In addition, Hitachi is using 3D-CAD engineering and our own construction management system to optimize the planning of construction procedures and the installation of equipment in these projects. Thus Hitachi is always striving to improve the reliability, safety and economy of ABWR construction technologies. (author)

  16. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  17. A study on the economics enhancement of OPR1000 applied to advanced construction methods

    International Nuclear Information System (INIS)

    Park, Ki Jo; Yoon, Eun Sang

    2007-01-01

    OPR1000 (Optimized Power Reactor 1000MW) is a totally improved design model of Korea nuclear power plants and the latest 1,000MW nuclear power plant in the Republic of Korea. Shin Kori 1 and 2 and Shin Wolsong 1 and 2 and under construction and these are OPR1000 types. Although OPR1000 is up to data 1,000MW nuclear power plant, it is not enough to be much superior to other nuclear power plants. Under the WTO and FTA circumstance of domestic and stiff overseas competition for nuclear power plants, it is necessary to enhance the economics of OPR1000. And then, the enhanced economic alternatives are reviewed and the advanced construction methods are considered. Based on research and a comprehensive review of nuclear power plant construction experiences, an alternative application of advanced construction methods is developed and compared with existing OPR1000 for schedule and economics. In this paper, economic analyses of a construction cost and a levelized electricity generation cost are performed

  18. Nuclear power: An evolving scenario

    International Nuclear Information System (INIS)

    ElBaradei, Mohamed

    2004-01-01

    The past two years have found the IAEA often in the spotlight - primarily because of our role as the world's 'nuclear watchdog', as we are sometimes referred to on the evening news. The most visible, and often controversial, peaceful nuclear application is the generation of electricity, the focus of this article largely from a European perspective. At the end of last year there were 440 nuclear power units operating worldwide. Together, they supply about 16% of the world's electricity. That percentage has remained relatively steady for almost 20 years. Expansion and growth prospects for nuclear power are centred in Asia. Of the 31 units under construction worldwide, 18 are located in India, Japan, South Korea and China, including Taiwan. Twenty of the last 29 reactors to be connected to the grid are also in the Far East and South Asia. That is probably more active construction than most Europeans would guess, given how little recent growth has occurred in the West. For Western Europe and North America, nuclear construction has been a frozen playing field - the last plant to be completed being Civaux-2 in France in 1999. That should raise a question: with little to no new construction, how has nuclear power been able to keep up with other energy sources, to maintain its share of electricity generation? Interestingly enough, the answer is tied directly to efforts to improve safety performance. The accident at Chernobyl in 1986 prompted the creation of the World Association of Nuclear Operators (WANO), and revolutionized the IAEA approach to nuclear power plant safety. Some analysts believe the case for new nuclear construction in Europe is gaining new ground, for a number of reasons: efforts to limit greenhouse gas emissions and reduce the risk of climate change; security of energy supply; Comparative Public Health Risk; different set of variables when choosing Each country's and region energy strategy. Looking to the future, certain key challenges are, of direct

  19. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  20. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  1. Innovation in nuclear power

    International Nuclear Information System (INIS)

    Blomgren, J.

    2017-01-01

    Institute for Nuclear Business Excellence Roots in Sweden and Finland in Global operation Services on nuclear business leadership: Independent advice, Executive training and Build-up of emerging nuclear countries. Plant construction and safety Plant construction: Plants are larger more complex with increased redundancy. Projects Failure in large technology is due to Corruption, Licensing mis-communication and Unclear roles and responsibilities. The chain of knowledge Design → construction→ operation → lifetime management → waste handling→ decommissioning. Maintenance and ageing start at the drawing table. Plant health monitoring. Today: Sensors are cheap Digital readout Enormous read out capacity''Internet of things''

  2. Nuclear power. Volume 2. Nuclear power project management

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 2 contains the following chapters: (1) review of nuclear power plants; (2) licensing procedures; (3) safety analysis; (4) project professional services; (5) quality assurance and project organization; (6) construction, scheduling, and operation; (7) nuclear fuel handling and fuel management; (8) plant cost management; and (9) conclusion

  3. Nuclear Safety

    Energy Technology Data Exchange (ETDEWEB)

    Silver, E G [ed.

    1989-01-01

    This document is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated.

  4. A Study on the Construct Validity of Safety Culture Oversight Model for Nuclear Power Operating Organization

    International Nuclear Information System (INIS)

    Jung, Su Jin; Choi, Young Sung; Oh, Jang Jin

    2015-01-01

    In Korea, the safety policy statement declared in 1994 by government stressed the importance of safety culture and licensees were encouraged to manage and conduct their self-assessments. A change in regulatory position about safety culture oversight was made after the event of SBO cover-up in Kori unit 1 and several subsequent falsification events. Since then KINS has been developing licensee's safety culture oversight system including conceptual framework of oversight, prime focus area for oversight, and specific details on regulatory expectations, all of which are based on defence-in-depth (DiD) safety enhancement approach. Development and gathering of performance data which is related to actual 'safety' of nuclear power plant are needed to identify the relationship between safety culture and safety performance. Authors consider this study as pilot which has a contribution on verifying the construct validity of the model and the effectiveness of survey based research. This is the first attempt that the validity of safety culture oversight model has been investigated with empirical data obtained from Korean nuclear power operating organization

  5. A Study on the Construct Validity of Safety Culture Oversight Model for Nuclear Power Operating Organization

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Su Jin; Choi, Young Sung; Oh, Jang Jin [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2015-05-15

    In Korea, the safety policy statement declared in 1994 by government stressed the importance of safety culture and licensees were encouraged to manage and conduct their self-assessments. A change in regulatory position about safety culture oversight was made after the event of SBO cover-up in Kori unit 1 and several subsequent falsification events. Since then KINS has been developing licensee's safety culture oversight system including conceptual framework of oversight, prime focus area for oversight, and specific details on regulatory expectations, all of which are based on defence-in-depth (DiD) safety enhancement approach. Development and gathering of performance data which is related to actual 'safety' of nuclear power plant are needed to identify the relationship between safety culture and safety performance. Authors consider this study as pilot which has a contribution on verifying the construct validity of the model and the effectiveness of survey based research. This is the first attempt that the validity of safety culture oversight model has been investigated with empirical data obtained from Korean nuclear power operating organization.

  6. Technology development brings sub-majors to N-power construction

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    In the past, the construction works of almost all reactor buildings were carried out by big five companies, but as the number of joint venture projects increased, the way opened for submajor firms to participate in the construction of main nuclear buildings. When the five major companies alone engaged in the construction of nuclear plant buildings, three submajor firms did most of the civil engineering works needed. The civil engineering works have been carried out also as joint venture. In order to break through the big five barrier, submajor companies have been engaged in the independent and joint development of nuclear-related design and construction techniques, and the gap with major companies has been closing. The typical joint study done by seven submajor companies was on the load-deflection characteristics of building structures. Also they engaged in aseismatic studies. The method of stripping the contaminated surface layer of shielding concrete is a new technique studied by JAERI. The activities of eleven submajor companies are reported. (Kako, I.)

  7. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  8. Pumps for nuclear facilities

    International Nuclear Information System (INIS)

    1999-01-01

    The guide describes how the Finnish Radiation and Nuclear Safety Authority (STUK) controls pumps and their motors at nuclear power plants and other nuclear facilities. The scope of the control is determined by the Safety Class of the pump in question. The various phases of the control are: (1) review of construction plan, (2) control of manufacturing, and construction inspection, (3) commissioning inspection, and (4) control during operation. STUK controls Safety Class 1, 2 and 3 pumps at nuclear facilities as described in this guide. STUK inspects Class EYT (non-nuclear) pumps separately or in connection with the commissioning inspections of the systems. This guide gives the control procedure and related requirements primarily for centrifugal pumps. However, it is also applied to the control of piston pumps and other pump types not mentioned in this guide

  9. Purchasing management experience of Haiyang nuclear power project construction period

    International Nuclear Information System (INIS)

    Ma Yuqin

    2013-01-01

    Purchasing is one of the important aspects to ensure the safety and quality of the nuclear power plant. This paper, combining the purchasing peculiarity and purchasing process of Haiyang nuclear power project, summarizes experiences of Haiyang nuclear power project in promoting its purchasing management level in aspects of purchasing method choosing, purchasing plan management, purchasing process optimization, purchasing contract implementation and purchasing surveillance, etc. (author)

  10. Strategy of nuclear power in Korea, non-nuclear-weapon state and peaceful use of nuclear power

    International Nuclear Information System (INIS)

    Nagasaki, Takao

    2005-01-01

    The nuclear power plant started at Kori in Korea in April, 1978. Korea has carried out development of nuclear power as a national policy. The present capacity of nuclear power plants takes the sixes place in the world. It supplies 42% total power generation. The present state of nuclear power plant, nuclear fuel cycle facility, strategy of domestic production of nuclear power generation, development of next generation reactor and SMART, strategy of export in corporation with industry, government and research organization, export of nuclear power generation in Japan, nuclear power improvement project with Japan, Korea and Asia, development of nuclear power system with nuclear diffusion resistance, Hybrid Power Extraction Reactor System, radioactive waste management and construction of joint management and treatment system of spent fuel in Asia are stated. (S.Y.)

  11. Development of the Nuclear Ship Database. 1. Outline of the Nuclear Ship Experimental Database

    Energy Technology Data Exchange (ETDEWEB)

    Kyouya, Masahiko; Ochiai, Masa-aki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Hashidate, Kouji

    1995-03-01

    We obtained the experimental data on the effects of the ship motions and the change in load and caused by the ship operations, the waves, the winds etc., to the nuclear power plant behavior, through the Power-up Tests and Experimental Voyages of the Nuclear Ship MUTSU. Moreover, we accumulated the techniques, the knowledge and others on the Nuclear Ship development at the each stage of the N.S. MUTSU Research and Development program, such as the design stage, the construction stage, the operation stage and others. These data, techniques, knowledge and others are the assembly of the experimental data and the experiences through the design, the construction and the operation of the first nuclear ship in JAPAN. It is important to keep and pigeonhole these products of the N.S. MUTSU program in order to utilize them effectively in the research and development of the advanced marine reactor, since there is no construction plan of the nuclear ship for the present in JAPAN. We have been carrying out the development of the Nuclear Ship Database System since 1991 for the purpose of effective utilization of the N.S. MUTSU products in the design study of the advanced marine reactors. The part of the Nuclear Ship Database System on the experimental data, called Nuclear Ship Experimental Database, was already accomplished and utilized since 1993. This report describes the outline and the use of the Nuclear Ship Experimental Database.The remaining part of the database system on the documentary data, called Nuclear Ship Documentary Database, are now under development. (author).

  12. Development of the Nuclear Ship Database. 1. Outline of the Nuclear Ship Experimental Database

    International Nuclear Information System (INIS)

    Kyouya, Masahiko; Ochiai, Masa-aki; Hashidate, Kouji.

    1995-03-01

    We obtained the experimental data on the effects of the ship motions and the change in load and caused by the ship operations, the waves, the winds etc., to the nuclear power plant behavior, through the Power-up Tests and Experimental Voyages of the Nuclear Ship MUTSU. Moreover, we accumulated the techniques, the knowledge and others on the Nuclear Ship development at the each stage of the N.S. MUTSU Research and Development program, such as the design stage, the construction stage, the operation stage and others. These data, techniques, knowledge and others are the assembly of the experimental data and the experiences through the design, the construction and the operation of the first nuclear ship in JAPAN. It is important to keep and pigeonhole these products of the N.S. MUTSU program in order to utilize them effectively in the research and development of the advanced marine reactor, since there is no construction plan of the nuclear ship for the present in JAPAN. We have been carrying out the development of the Nuclear Ship Database System since 1991 for the purpose of effective utilization of the N.S. MUTSU products in the design study of the advanced marine reactors. The part of the Nuclear Ship Database System on the experimental data, called Nuclear Ship Experimental Database, was already accomplished and utilized since 1993. This report describes the outline and the use of the Nuclear Ship Experimental Database.The remaining part of the database system on the documentary data, called Nuclear Ship Documentary Database, are now under development. (author)

  13. Study finds declining construction leadtimes for nukes being built

    International Nuclear Information System (INIS)

    Smock, R.

    1983-01-01

    A new Electric Power Research Institute (EPRI) study of 26 nuclear projects shows a decrease in the leadtime for nuclear plants under construction in contrast to the findings of other studies. The EPRI study plots construction leadtime against the year of construction permit issuance rather than the year of completion, and it eliminates management delays, physical plant differences, and management differences. The result is a two-part trendline reflecting the discontinuity of regulatory ratchet effects, which cause 50% of construction leadtime delay while labor material delivery problems account for 20% and deliberate delays 22% of leadtime delay. When allowance is made for deliberate delays, there is no growth in construction leadtime. There was no correlation of utility finances, the accuracy of load growth forecasts, or the state regulatory environment to the length of construction. 3 figures,

  14. Nuclear power status 1998

    International Nuclear Information System (INIS)

    1999-01-01

    The document gives general statistical information (by country) about electricity produced by nuclear power plants in the world in 1998, and in a table the number of nuclear reactors in operation, under construction, nuclear electricity supplied in 1998, and total operating experience as of 31 December 1998

  15. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2000-01-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1999 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1999; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; grid connection forecasts; world electric power market; electronuclear owners and share holders in EU, capacity and load factor; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; 1999 gross load factor by operator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  16. Non-destructive control in nuclear construction

    International Nuclear Information System (INIS)

    Banus; Barbier; Launay

    1978-01-01

    Having recalled the characteristics of the fundamental components of the main primary circuit of nuclear boilers (900 MW) and the means appropriated for their control, it is recalled that the 'French Electricity Board's specifications and control rules' often prescribe more severe criteria than those existing in the U.S.A. Then practical examples of non-destructive controls concerning the steam generator end plates, vessel stainless steel linings, pump attachements, steam generator pipes are given [fr

  17. Whistleblowers ask Congress to investigate TVA's nuclear power program

    International Nuclear Information System (INIS)

    Lane, E.

    1993-01-01

    Congress should investigate the Tennessee Valley Authority's nuclear power plant construction and operations programs as soon as possible, a coalition of Tennessee environmentalists and whistleblowers told reporters at a press conference in Washington, DC. The Foundation for Global Sustainability and four employees of TVA nuclear plants called for congressional action because they contend the Nuclear Regulatory Commission and the Department of Labor have failed to act to protect whistleblowers who report nuclear safety problems. The foundation contends the economics of nuclear plant construction by TVA do not make sense and in the rush to finish the Watts Bar nuclear plant, which has been under construction for 20 years, TVA has ignored safety issues

  18. Project quality management under EPC mode by the owner of nuclear power plant

    International Nuclear Information System (INIS)

    Xu Hui; Hu Miao

    2014-01-01

    As the first completely independent nuclear power project in China, Fangjiashan nuclear power project is constructed under EPC mode of general project contracting. This paper, taking the project as an example, aims to explore how the project owners carry out quality management for the installation project during the construction of the nuclear power plant based on EPC mode. It has certain reference value for the management of following nuclear power projects which adopting the EPC construction mode. It will play a positive role in improving China's overall self-management abilities in the nuclear power construction, and lay a solid foundation for follow-up nuclear power construction in China. (authors)

  19. Mitigation of socio-economic impacts due to the construction of energy projects in rural communities: an evaluation of the Hartsville nuclear power plant transportation-mitigation program

    International Nuclear Information System (INIS)

    Whitney, T.C.

    1982-01-01

    This study analyzes the effects of a commuter ride-sharing program in mitigating the harmful socio-economic impacts of a short-term, labor-intensive nuclear-power-plant construction project. The major hypothesis is that transportation-mitigation programs are more cost-effective in reducing the undesirable socio-economic impacts of large-scale construction projects than programs designed to mitigate impacts through the provision of public services for migrating workers. The dissertation begins by delineating the socio-economic effects of large-scale construction projects in rural areas. It proceeds to show how some of the deleterious impacts were mitigated using a commuter ride-sharing program. After the range of potential socio-economic impacts was established, a framework was developed to evaluate the effects of the transportation-mitigation program in mediating the harmful impacts. The framework involved the integration of the cost-benefit technique with social-impact assessment. The evaluation was grounded in a comparative framework whereby the Hartsville project community was compared with a similar community undergoing the construction of a nuclear power plant but without a commuter ride-sharing program, and a community not experiencing a major construction project. The research findings indicated that the transportation-mitigation program substantially reduced the in-migration of construction workers into the Hartsville-Trousdale County area. Further, the program was cost effective, with a benefit-cost ratio of 2.5 and net benefits totalling 28 million dollars

  20. Revolution of Nuclear Power Plant Design Through Digital Technology

    International Nuclear Information System (INIS)

    Zhang, L.; Shi, J.; Chen, W.

    2015-01-01

    In the digital times, digital technology has penetrated into every industry. As the highest safety requirement standard, nuclear power industry needs digital technology more to breed high quality and efficiency. Digital power plant is derived from digital design and the digitisation of power plant transfer is an inevitable trend. This paper introduces the technical solutions and features of digital nuclear power plant construction by Shanghai Nuclear Engineering Research & Design Institute, points out the key points and technical difficulties that exist in the process of construction and can serve as references for further promoting construction of digital nuclear power plant. Digital technology is still flourishing. Although many problems will be encountered in construction, it is believed that digital technology will make nuclear power industry more safe, cost-effective and efficient. (author)