  1. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  2. Outline of design and construction work related to the installation of freshwater storage tank at Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Ozaki, Mitsuhiro; Yamaguchi, Kazuhide; Suzuki, Takeshi

    2017-01-01

    Tohoku Electric Power Co., Ltd., at its Higashidori Nuclear Power Station, is promoting the installation of safety measure facilities as an effort to restart the operation. It is implementing a freshwater storage tank installation work to secure core cooling function at the time of severe accident occurrence. Construction started in June 2014, drilling and construction of the framework have advanced while paying due attention to quality assurance, and affiliated facilities are currently under construction. This paper reports the outline of planning, design, and construction work of this project. (A.O.)

  3. Verification of new technologies introduced into the privately-owned port of Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Murano, Sei-ichiro; Ozaki, Tsutomu; Date, Masanao

    2005-01-01

    The privately-owned port of Higashidori Nuclear Power Station introduced the rubble-slopping breakwater as the seawall and the concrete-caisson breakwater (new caisson breakwater) as the outlet seawall. The distribution of wave pressure on the new caisson breakwater was measured by the wave pressure meteor set on it and compared with the results of the hydraulic model tests. The precast concrete armour unit used Acropod. The conditions of new caisson breakwater, measurement of wave pressure, and the optimum conditions of seawall are stated. The new caisson breakwater showed the high dispersive effect of the impact wave force on the surf zone. The construction cost was decreased by reduction of sectional area and the wave dissipating concrete block. There are no problems about the stability of breakwater confirmed by the hydraulic model test. (S.Y.)

  4. Evaluation of bedrock mainly composed of volcanic aggregate rocks at the Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Hashimoto, Shuichi; Miwa, Tadashi; Nishidachi, Masayuki

    2000-01-01

    When carrying out engineering evaluation on foundation bedrock for important constructions such as nuclear power station, dam, and so forth, it is required as a premise on carrying out various surveys, tests, and analyses to select adequate geological elements, to classify them to some groups capable of regarding as a common engineering property, and to rate them. On a hard bedrock, there is a classification method with relatively higher versatility adding condition of crack and weathering to performances at each site as an index, but on a soft one, most of its classification are carried out individually for its site in response to an index caused by the bedrock itself. Here were shown the results carried out some bedrock classifications on a base of grouping for rock sorts and rock phases, according to some concepts on a draft of the standard on the soft bedrock classification due to the nuclear engineering committee of the Japan Society of Civil Engineers, a reference draft on the soft bedrock classification of the 'Technical indications on seismic resistance design of the nuclear power station' of the Japan Electric Association, (JEAG4601-1987), and so forth. As a result applied the reference draft on the soft bedrock, and so forth to the bedrock at the Higashidori Nuclear Power Station composed of volcanic aggregate rocks of the Miocene epoch of the new Tertiary system, an adequate engineering evaluation was made possible by making grouping of rock sorts and rock phases to a foundation. And, on property evaluation of the quality changed vein, as a result of various tests, appropriate properties could be obtained. (G.K.)

  5. Management of main generator condition during long term plant shut down at Higashidori Nuclear Power Station Unit 1

    International Nuclear Information System (INIS)

    Kato, Seiji

    2014-01-01

    Higashidori Nuclear Power Station Unit 1 shut down on February 6, 2011 to start 4th refuel outage. On March 11, 2011, we keep going refuel outage on this moment a large earthquake occurred and tsunami was generated following it which called 'Great East Japan Earthquake'. Refuel outage takes 3 ∼ 5 months normally but Higashidori NPS still keeping shut down over 3 years due to some issues. In this paper, we introduce about management of Main generator condition during long term plant shut down situation in addition to normal plant shut down situation to keep well. (author)

  6. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  7. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Aspden, G.J.

    1980-01-01

    A nuclear reactor construction comprising a reactor core submerged in a pool of liquid metal coolant in a primary vessel which is suspended from the roof structure of a containment vault. Control rods supported from the roof structure are insertable in the core which is carried on a support structure from the wall of the primary vessel. To prevent excessive relaxation of the support structure whereby the control rods would be displaced relative to the core, the support structure incorporates a normally inactive secondary structure designed to become effective in bracing the primary structure against further relaxation beyond a predetermined limit. (author)

  8. Innovations in nuclear concrete constructions

    International Nuclear Information System (INIS)

    Tatum, C.B.

    1983-01-01

    The technical requirements and scope of concrete work on nuclear projects present significant engineering and construction challenges. These demands represent the extremes in many areas of construction operations. In meeting these challenges, engineering and construction forces have developed several innovations which can be beneficially applied to other types of construction. Innovative approaches in the general categories of engineering scope, construction input to engineering, work planning, special methods and techniques, and satisfaction of quality assurance requirements are given in this paper. The transfer of this technology to other segments of the construction industry will improve overall performance by avoiding the problem areas encountered on nuclear projects

  9. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Baddley, A.H.

    1981-01-01

    A method of constructing a radiation shielding plug for use in the roof of the coolant containment vault of liquid metal cooled fast breeder reactors is described. The construction allows relative movement of that part of service cables and pipes which are carried by the fixed roof and that part which is carried by the rotatable plug. (U.K.)

  10. Nuclear power plant containment construction

    International Nuclear Information System (INIS)

    Schabert, H.P.; Danisch, R.; Strickroth, E.

    1975-01-01

    The Nuclear Power Plant Containment Construction includes the spherical steel safety enclosure for the reactor and the equipment associated with the reactor and requiring this type of enclosure. This steel enclosure is externally structurally protected against accident by a concrete construction providing a foundation for the steel enclosure and having a cylindrical wall and a hemispherical dome, these parts being dimensioned to form an annular space surrounding the spherical steel enclosure, the latter and the concrete construction heretofore being concentrically arranged with respect to each other. In the disclosed construction the two parts are arranged with their vertical axis horizontally offset from each other so that opposite to the offsetting direction of the concrete construction a relatively large space is formed in the now asymmetrical annular space in which reactor auxiliary equipment not requiring enclosure by the steel containment vessel or safety enclosure, may be located outside of the steel containment vessel and inside of the concrete construction where it is structurally protected by the latter

  11. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  12. Construct ability Improvement for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dae Soo; Lee, Jong Rim; Kim, Jong Ku [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    The purpose of this study was to identify methods for improving the construct ability of nuclear power plants. This study reviewed several references of current construction practices of domestic and overseas nuclear plants in order to identify potential methods for improving construct ability. The identified methods for improving construct ability were then evaluated based on the applicability to domestic nuclear plant construction. The selected methods are expected to reduce the construction period, improve the quality of construction, cost, safety, and productivity. Selection of which methods should be implemented will require further evaluation of construction modifications, design changes, contract revisions. Among construction methods studied, platform construction methods can be applied through construction sequence modification without significant design changes, and Over the Top construction method of the NSSS, automatic welding of RCL pipes, CLP modularization, etc., are considered to be applied after design modification and adjustment of material lead time. (author). 49 refs., figs., tabs.

  13. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  14. Engineering development in nuclear power plant construction

    International Nuclear Information System (INIS)

    Guenther, P.

    1979-01-01

    Proceeding from the up-to-now experience in the erection of nuclear power stations, especially of the first and second unit of the Greifswald nuclear power plant, the following essential aspects of the development of constructional engineering are discussed: (1) constructional features and criteria, (2) organizational management, (3) current status and problems in prelimary operations, and (4) possibilities of further expenditure reductions in constructing nuclear power stations

  15. Haiyang nuclear power construction management and practice

    International Nuclear Information System (INIS)

    Wang Fengxue

    2010-01-01

    The paper introduces the basic situation of Shandong Haiyang Nuclear Power Plant, as well as the management and progress of the project. Through the construction management practice, problems encountered in nuclear power construction are put forward for peer exchange and discussion. (author)

  16. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  17. Nuclear waste repository design and construction

    International Nuclear Information System (INIS)

    Bohlke, B.M.; Monsees, J.E.

    1987-01-01

    Extensive underground excavation will be required for construction of a mined geologic repository for nuclear waste. Hundreds of thousands of feet of drift will be required based on the conceptual layout design for each candidate nuclear waste repository. Comparison of boring and blasting excavation methods are discussed, as are special design and construction requirements (e.g., quality assurance procedures and performance assessment) for the nuclear waste repository. Comparisons are made between boring and blasting construction methods for the repository designs proposed for salt, volcanic tuff, and basalt

  18. Nuclear plant construction and investment risk

    International Nuclear Information System (INIS)

    Studness, C.M.

    1984-01-01

    Escalated cost estimations, delays and cancellations in nuclear construction have caused a preoccupation with the risks of nuclear power plant construction that dominates utility stock investment, overshadowing increased earnings per share and recent growth in production. The issue will be resolved when increased power demand requires new construction, but the effect has so far been to erode the economic advantage of nuclear power and threaten the ability of utilities to get rate increases high enough to cover their costs. Projected delays and cost escalations and their effects must go into an economic appraisal of the investment risks

  19. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    There is no single satisfactory way to measure productivity in the construction industry. The industry is too varied, too specialized and too dependent upon vast numbers of interrelations between trades, contractors, designers and owners. Hence, no universally reliable indices for measuring construction productivity has been developed. There are problems that are generic to all large union-built nuclear power plants. The actions of any one owner cannot rectify the shortcomings of the construction industry. The generic problems are being identified, and many national organizations are attempting to make the construction industry more productive by recommending various changes

  20. Summary of nuclear power plant construction

    International Nuclear Information System (INIS)

    Tamura, Saburo

    1973-01-01

    Various conditions for the construction of nuclear power plants in Japan without natural resources were investigated. Expansion of the sites of plants, change of reactor vessels, standardization of nuclear power plants, possiblity of the reduction of construction period, approaching of nuclear power plants to consuming cities, and group construction were studied. Evaluation points were safety and economy. Previous sites of nuclear power plants were mostly on plane ground or cut and enlarge sites. Proposals for underground or offshore plants have been made. The underground plants were made at several places in Europe, and the ocean plant is now approved in U.S.A. as a plant on a man-made island. Vessels for containing nuclear reactors are the last barriers to the leakage of radioactive substance. At the initial period, the vessels were made of steel, which were surrounded by shielding material. Those were dry well type containers. Then, vessel type changed to pressure-suppression type wet containers. Now, it tends to concrete (PC or RC) type containers. There is the policy on the standardization of nuclear power plants by U.S.A.E.C. in recent remarkable activity. The merit and effect of the standardization were studied, and are presented in this paper. Cost of the construction of nuclear power plants is expensive, and interest of money is large. Then, the reduction of construction period is an important problem. The situations of plants approaching to consuming cities in various countries were studied. Idea of group construction is described. (Kato, T.)

  1. Enhancing quality of construction on nuclear facilities

    International Nuclear Information System (INIS)

    Buchert, K.P.

    1984-01-01

    From the author's viewpoint and the viewpoint of others, the quality of construction on both nuclear projects and many other non-nuclear projects has decreased. The trend toward recent QA and QC methods of contractors doing their own inspection has not only tended to reduce the quality of construction, but also has discouraged qualified inspectors from accepting positions where this type of QA and QC is practiced. In addition, the methods have decreased the desired interaction between design engineers and construction management. The paper contains detailed recommendations on how the quality of construction can be enhanced on nuclear projects. It is also shown that construction quality must be obtained by different methods than those used to obtain manufacturing quality

  2. Geodesy problems in nuclear power plant construction

    International Nuclear Information System (INIS)

    Eory, K.

    1981-01-01

    The special geodetic problems encountered during the construction of the Paks nuclear power plants are treated. The main building with its hermetically connected components including the reactor, the steam generators, the circulation pumps etc. impose special requirements on the control net of datum points. The geodesy tasks solved during the construction of the main building are presented in details. (R.P.)

  3. Nuclear power plants: 2005 atw compact statistics

    International Nuclear Information System (INIS)

    Anon.

    2006-01-01

    Nuclear power plants were available for power supply and under construction, respectively, in 32 countries of the world as per end of 2005. A total of 444 nuclear power plants, i.e. three plants more than at the end of 2004, with an aggregate gross power of approx. 389 GWe and an aggregate net power of 370 GWe, respectively, were in operation in 31 countries. The available capacity of nuclear power plants increased by some 4,5 GWe as a result of the capacities added by the four newly commissioned units of Higashidori 1 (Japan), Shika 2 (Japan), Tarapur 4 (India), and Tianwan 1 (China). In addition, unit A-1 of the Pickering nuclear power station in Canada, with 825 MWe, was restarted after a downtime of several years. Two plants were decommissioned for good in 2005: Obrigheim in Germany, and Barsebaeck 2 in Sweden. 23 nuclear generating units, i.e. one unit more than in late 2004, with an aggregate gross power of approx. 19 GWe were still under construction in nine countries by late 2005. In Pakistan, construction of a new project, Chasnupp 2, was started; in China, construction was begun of two units, Lingao Phase 2, units 3 and 4, and in Japan, the Shimane 3 generating unit is being built. (orig.)

  4. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  5. Nuclear reactor control room construction

    International Nuclear Information System (INIS)

    Lamuro, R.C.; Orr, R.

    1993-01-01

    A control room for a nuclear plant is disclosed. In the control room, objects labelled 12, 20, 22, 26, 30 in the drawing are no less than four inches from walls labelled 10.2. A ceiling contains cooling fins that extend downwards toward the floor from metal plates. A concrete slab is poured over the plates. Studs are welded to the plates and are encased in the concrete. 6 figures

  6. Core construction for nuclear reactors

    International Nuclear Information System (INIS)

    Pettinger, D.S.

    1977-01-01

    HTR core construction with prismatic graphite blocks piled into columns. The front of the blocks is concavely curved. The lines of contact of two blocks are always not vertical, i.e. the blocks of one column are supported by the blocks of neighbouring columns so that ducts are formed. Groups of three or four of these columns may additionally be arranged around a central column which has recesses in order to lock the blocks of one group together. With this arrangement, dimensional changes of the graphite blocks under operating conditions can be taken up. (DG) [de

  7. Design and construction of nuclear power plants

    CERN Document Server

    Schnell, Jürgen; Meiswinkel, Rüdiger; Bergmeister, Konrad; Fingerloos, Frank; Wörner, Johann-Dietrich

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply.Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overv

  8. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  9. Strengthening of nuclear power plant construction safety management

    International Nuclear Information System (INIS)

    Yu Jun

    2012-01-01

    The article describes the warning of the Fukushima nuclear accident, and analyzes the major nuclear safety issues in nuclear power development in China, problems in nuclear power plants under construction, and how to strengthen supervision and management in nuclear power construction. It also points out that the development of nuclear power must attach great importance to the safety, and nuclear power plant construction should strictly implement the principle of 'safety first and quality first'. (author)

  10. Construction Improvement for the Korean Nuclear Program

    International Nuclear Information System (INIS)

    Yang, T. E.

    1992-01-01

    Construction of the nine Nuclear plants requires an enormous financial investment. The decision to build a nuclear unit is based on both economic and resource requirements. Korea has few natural resources to use for power generation so the use of diversified fuel sources is a part of the planning process. Nuclear has historically had economic advantages over the fossil fueled plant, however, this advantage has been reduced. This is mainly due to increasing decommissioning and waste disposal costs plus the financial outlays associated with gaining public acceptance of new nuclear units. One of the principal means to recover the economic advantage of a nuclear plant is to shorten the time needed for construction. Every extra day of construction costs large sums of money in interest and escalation expenses alone. The challenge is to shorten the construction period to the minimum feasible time and thereby reduce the financing costs. The methods that have to be employed to achieve this goal require the total commitment from the management of all entities involved in the program. Through the application of advanced management and construction techniques a new era in the construction of nuclear plants in Korea will occur. This will include changes to the methods used for managing, planning, licensing, designing and constructing the new plants. The ability to meet the aggressive plan for the construction of new nuclear power plants in Korea rests in the hands of the managers of all the parties involved. These men set all the rules by which the new plants will be constructed. It is their responsibility to tackle the current problems and develop the solutions to enable the plan to be realized. The changes suggested within this paper are major, but the potential benefits will allow the Korean Nuclear Industry to advance into the twenty first Century as a leader. The number of fully trained specialists needed to make this happen will not appear overnight. They will have to be

  11. Analysis of nuclear-power construction costs

    International Nuclear Information System (INIS)

    Jansma, G.L.; Borcherding, J.D.

    1988-01-01

    This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures

  12. Design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Meiswinkel, Ruediger; Meyer, Julian; Schnell, Juergen

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply. Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overview from approval aspects given by nuclear and construction law, with special attention to the interface between plant and construction engineering, to a building structure classification. All life cycle phases are considered, with the primary focus on execution. Accidental actions on structures, the safety concept and design and fastening systems are exposed to a particular treatment. Selected chapters of the German concrete yearbook ''Beton-Kalender'' are now available in English. The new English BetonKalender Series delivers internationally useful engineering expertise and industrial know-how from Germany.

  13. Construction Technologies for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2011-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world'. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Statute Article III, A.6, the IAEA safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on and practical application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. There are three distinct significant phases in a nuclear power plant (NPP) project after the signing of a contract; engineering, procurement, and construction and commissioning. Experience gained over the last forty years has shown that the construction phase is one of the most critical phases for the success of a project. Success is defined as completing the project with the specified quality, and within budget and schedule. The key to a successful construction project is to have an established programme that integrates the critical attributes into the overall project. Some of

  14. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  15. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  16. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  17. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  18. Construction of nuclear special information service

    International Nuclear Information System (INIS)

    Oh, Jeong Hoon; Kim, Tae Whan; Yi, Ji Ho; Chun, Young Choon; Yoo, Jae Bok; Yoo, An Na; Choi, Heon Soo

    2012-01-01

    Domestic INIS project has carried out various activities on supporting a decision-making for INIS Secretariat, exchanges of the statistical information between INIS and the country, and technical assistance for domestic end-users using INIS database. Based on the construction of INIS database sent by member states, the data published in the country has been gathered, collected, and inputted to INIS database according to the INIS reference series. Using the INIS output data, it has provided domestic users with searching INIS CD-ROM DB, INIS online database, INIS SDI service, and non-conventional literature delivery services. INIS2 DB Host site in Korea has serviced users of domestic and INIS member countries. In order to maintain the same data as Vienna center, the data update process has been performed. Also, publicity information activities were performed by many ways. To construct digital information infrastructure, we changed web server of KORNIS21 and we reconstruct digital library system as separation of KAERI network system. We constructed patent trend analysis system and new SDI service system. Also we collected Web DB, digital journals and so on and made an effort on operation of knowledge management system and research documents management. We have inputted over 4,000 records per year since 2009 and the input amount this year has reached 4,284 records. In order to input the comprehensive domestic publication related to nuclear energy, and rise in position of the national center, it is necessary to continue efforts and support budgets. We expect the INIS2 DB Host site will make a contribution to the improvement of productivity in the nuclear energy research as well as the diffusion of information about nuclear energy. We provided users with stable services changing web server of KORNIS21. Also we contributed to the improvement of researcher's productivity by constructing patent trend analysis system, new SDI service system and provided users with services

  19. Construction of nuclear special information service

    International Nuclear Information System (INIS)

    Oh, Jeong Hoon; Kim, Tae Whan; Lee, Kyu Jeong; Yi, Ji Ho; Chun, Young Choon; Yoo, Jae Bok; Yoo, An Na

    2009-02-01

    Domestic INIS project has carried out various activities on supporting a decision-making for INIS Secretariat, exchanges of the statistical information between INIS and the country,and technical assistance for domestic end-users using INIS database. Based on the construction of INIS database sent by member states, the data published in the country has been gathered, collected, and inputted to INIS database according to the INIS reference series. Using the INIS output data, it has provided domestic users with searching INIS CD-ROM DB, INIS online database, INIS SDI service, and non-conventional literature delivery services. INIS2 DB Host site in Korea has serviced users of domestic and INIS member countries. In order to maintain the same data as Vienna center, the data update process has been performed. Also, publicity information activities were performed by many ways. To construct digital information infrastructure, we changed web server of NUCLIS21 and upgraded information management manager system and constructed full text DB on research and technical reports. Also we collected web DB, digital journals and so on and made an effort on operation of knowledge management system and research documents management. We have inputted over 3,000 records per year since 2002 and the input amount this year has reached 3,738 records. In order to input the comprehensive domestic publication related to nuclear energy, and rise in position of the national center, it is necessary to continue efforts and support budgets. We expect the INIS2 DB Host site will make a contribution to the improvement of productivity in the nuclear energy research as well as the diffusion of information about nuclear energy. We provided users with stable services changing web server of NUCLIS21. Also we contributed to the improvement of librarians' productivity by upgrading information management manager system and provided users with services of web DB, digital journals and so on

  20. Construction quality assurance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-10-01

    This Standard contains the requirements for the quality assurance program applicable to the construction phase of a nuclear power plant. This Standard covers all activities carried out for and by the owner from the receipt of components or materials on the site to their incorporation in systems or structures as required by drawings or other formal engineering information. It also covers the provision of required support activities and equipment and applies at all stages on the site as far as the testing of components or systems before they are submitted for commissioning. 2 figs.

  1. Construction quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1983-10-01

    This Standard contains the requirements for the quality assurance program applicable to the construction phase of a nuclear power plant. This Standard covers all activities carried out for and by the owner from the receipt of components or materials on the site to their incorporation in systems or structures as required by drawings or other formal engineering information. It also covers the provision of required support activities and equipment and applies at all stages on the site as far as the testing of components or systems before they are submitted for commissioning. 2 figs

  2. Construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Jicha, J.

    1989-01-01

    The Temelin nuclear power plant with four WWER-1000 reactors is designed to supply electricity in an amount of 23 TWh/yr and heat in an amount of 8000 TJ/yr in the first stage. The maximum heat extraction should be 922 MW. The plant construction includes the building of 10 buildings, the total cost being 52 thousand million Czechoslovak crowns. Another 41 investment items are associated with the plant construction. The most important of them include constructions for leading out the electric power, for standby electricity supply for the power plant, and for the extraction of heat from the plant and its supply to the town of Ceske Budejovice. The first unit should be started up for test performance in November 1992, the second in 1994 and the whole power plant should be complete by 1998. The state of the construction by February 1989 is described in detail. Attention is also paid to the preparatory activity for the operation and to social welfare of the personnel. (Z.M.)

  3. Advanced construction methods for new nuclear power plants

    International Nuclear Information System (INIS)

    Bilbao y Leon, Sama; Cleveland, John; Moon, Seong-Gyun; Tyobeka, Bismark

    2009-01-01

    The length of the construction and commissioning phases of nuclear power plants have historically been longer than for conventional fossil fuelled plants, often having a record of delays and cost overruns as a result from several factors including legal interventions and revisions of safety regulations. Recent nuclear construction projects however, have shown that long construction periods for nuclear power plants are no longer the norm. While there are several inter-related factors that influence the construction time, the use of advanced construction techniques has contributed significantly to reducing the construction length of recent nuclear projects. (author)

  4. Nuclear power plant equipment design and construction rules

    International Nuclear Information System (INIS)

    Boiron, P.

    1983-03-01

    Presentation of the AFCEN (French association for nuclear power plant equipment design and construction rules) working, of its edition activity and of somes of its edited documents such as RCC-C (design and construction rules for PWR power plant fuel assemblies) and RCC-E (design and construction rules for nuclear facility electrical equipments) [fr

  5. Nuclear power-related facilities and neighboring land price: a case study on the Mutsu-Ogawara region, Japan.

    Science.gov (United States)

    Yamane, Fumihiro; Ohgaki, Hideaki; Asano, Kota

    2011-12-01

    From the perspective of risk, nuclear-power-related facilities (NPRFs) are often regarded as locally undesirable land use. However, construction of NPRFs contributes to social infrastructural improvement and job creation in the host communities. This raises a question: How large are these positive and negative effects? To approach this question from an economic viewpoint, we estimated the hedonic land price function for the Mutsu-Ogawara region of Japan from 1976 to 2004 and analyzed year-by-year fluctuations in land prices around the NPRFs located there. Land prices increased gradually in the neighborhood of the nuclear fuel cycle facilities (NFCFs) in Rokkasho Village, except for some falling (i) from 1982 to 1983 (the first official announcement of the project of construction came in 1983), (ii) from 1987 to 1988 (in 1988, the construction began and opposition movements against the project reached their peak), and (iii) from 1998 to 1999 (the pilot carry-in of spent fuels into the reprocessing plant began in 1998). Land prices around the Higashidori Nuclear Power Plant decreased during the period 1981-1982, when the Tohoku Electric Power Corp. and Tokyo Electric Power Corp. announced their joint construction plan. On the other hand, we obtained some results, even though not significant, indicating that land prices around Ohminato and Sekinehama harbors changed with the arrival and departure of the nuclear ship Mutsu, which suffered a radiation leak in 1974. © 2011 Society for Risk Analysis.

  6. Delays in nuclear power plant construction. Volume II. Final report

    International Nuclear Information System (INIS)

    Mason, G.E.; Larew, R.E.; Borcherding, J.D.; Okes, S.R. Jr.; Rad, P.F.

    1977-01-01

    The report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts which should minimize or eliminate the identified barriers. The identified barriers include (1) Design and Construction Interfacing Problems; (2) Problems Relating to the Selection and Use of Permanent Materials and Construction Methods; (3) Construction Coordination and Communication Problems; and (4) Problems Associated with Manpower Availability and Productivity

  7. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  8. Delays in nuclear power plant construction. Volume I. Final report

    International Nuclear Information System (INIS)

    1977-01-01

    The report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts which should minimize or eliminate the identified barriers. The identified barriers include: (1) Design and Construction Interfacing Problems; (2) Problems Relating to the Selection and Use of Permanent Materials and Construction Methods; (3) Construction Coordination and Communication Problems; and (4) Problems Associated with Manpower Availability and Productivity

  9. Research and exploration on nuclear safety culture construction

    International Nuclear Information System (INIS)

    Zhang Lifang; Zhao Hongtao; Wang Hongwei

    2012-01-01

    This thesis mainly researched the definition, characteristics, development stage and setup procedure concerning nuclear safety culture, based on practice and experiences in Technical Physics Institute of Heilongjian. Academy of Science. The author discussed the importance of nuclear safety culture construction for an enterprise of nuclear technology utilization, and emphasized all the enterprise and individual who engaged in nuclear and radiation safety should acquire good nuclear safety culture quality, and ensure the application and development of the nuclear safety cult.ure construction in the enterprises of nu- clear technological utilization. (authors)

  10. Constructibility issues associated with a nuclear waste repository in basalt

    International Nuclear Information System (INIS)

    Turner, D.A.

    1981-01-01

    This report contains the text and slide reproductions of a speech on nuclear waste disposal in basalt. The presentation addresses the layout of repository access shafts and subsurface facilities resulting from the conceptual design of a nuclear repository in basalt. The constructibility issues that must be resolved prior to construction are described

  11. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  12. Quality assurance in the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Bernsen, S.A.

    1975-01-01

    A general survey of quality-assurance (QA) practices as they relate to the construction phase of nuclear power plants is presented. The article briefly outlines the evolution of construction QA requirements, describes construction practices and organizational relations that help identify the unique construction-phase features that affect QA practices, identifies some of the principal requirements and programmatic problems involving construction, and discusses potential trends and suggested guidelines for the implementation of particular practices. (U.S.)

  13. Japanese experience in nuclear power plant construction

    International Nuclear Information System (INIS)

    Seko, T.

    1989-01-01

    Development of LWR in JAPAN started by introducing LWR from the U.S.A. Since then we have been improving existing technology and promoting domestic technology development based on experiences accumulated in Japan. As a result, recent operating performance has been excellent. As far as construction work is concerned, we also have been making our best efforts to improve the performance of construction work itself, with the cooperation of manufacturers. As for construction work, we have succeeded in improving the quality of construction work, shortening the construction period and reducing construction costs through new technology and Japanese-style work management

  14. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  15. Toshiba's developments on construction techniques of nuclear power plants

    International Nuclear Information System (INIS)

    Hayashi, Y.; Itoh, N.

    1987-01-01

    Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation

  16. A probabilistic model for US nuclear power construction times

    International Nuclear Information System (INIS)

    Shash, A.A.H.

    1988-01-01

    Construction time for nuclear power plants is an important element in planning for resources to meet future load demands. Analysis of actual versus estimated construction times for past US nuclear power plants indicates that utilities have continuously underestimated their power plants' construction durations. The analysis also indicates that the actual average construction time has been increasing upward, and the actual durations of power plants permitted to construct in the same year varied substantially. This study presents two probabilistic models for nuclear power construction time for use by the nuclear industry as estimating tool. The study also presents a detailed explanation of the factors that are responsible for increasing and varying nuclear power construction times. Observations on 91 complete nuclear units were involved in three interdependent analyses in the process of explanation and derivation of the probabilistic models. The historical data was first utilized in the data envelopment analysis (DEA) for the purpose of obtaining frontier index measures for project management achievement in building nuclear power plants

  17. Development of new construction technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Kawamata, Susumu; Itoh, Daisuke; Ichizono, Katsuyuki

    1995-01-01

    In order to proceed rationally with the construction of a nuclear power station, the followings are the subject to solve beside reducing the construction cost: shortening the construction period, improving the quality, and securing safety in the construction work. As a measure to solve the matters, we correctly construct the plant mainly applying 'all-weather proof construction method' and 'pre-assembled large-block construction method'. Furthermore, as the plant construction control system, we perform a construction work applying the design change management system, pre-assessment for safety, and the whole facility check. As a result of our effort, it was attained that when we compare the matured plant with the first unit, the construction cost is reduced by 30%, the construction period is shortened by 12 months, site manpower is decreased by 30%, and the plant had no sudden shutdowns even during the trial operation period. (author)

  18. Information resources for nuclear power construction

    International Nuclear Information System (INIS)

    Rozin, V.M.

    1987-01-01

    Problems of designing and introduction of data resources (in the form of magnetic carrier data) for the construction of NPP with the WWER-1000 type reactors are considered. It is suggested that the data resources should be supplied to the construction as independent production alongside with preliminary estimation and material resources. It is pointed out that the introduction of the data resource will permit to increase the efficiency of NPP construction management

  19. Construction-man hour estimation for nuclear power plants

    International Nuclear Information System (INIS)

    Paek, J.H.

    1987-01-01

    This study centers on a statistical analysis of the preliminary construction time, main construction time, and total construction man hours of nuclear power plants. The use of these econometric techniques allows the major man hour driving variables to be identified through multivariate analysis of time-series data on over 80 United States nuclear power plants. The analysis made in this study provides a clearer picture of the dynamic changes that have occurred in the man hours of these plants when compared to engineering estimates of man hours, and produces a tool that can be used to project nuclear power plant man hours

  20. Construction Cost Growth for New Department of Energy Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kubic, Jr., William L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-05-25

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

  1. Progress in resolving construction issues on nuclear projects

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1985-01-01

    The cost of nuclear plant construction in the United States can be drastically reduced. Progress is being made in the reduction of construction costs and with continuing effort much more can be done. The easiest way to attack high costs is to eliminate the unnecessary repairs and rework in construction, along with the time consuming evaluations and dispositions, and to use common sense in design practices. By doing this, millions of dollars could easily be cut from the cost of construction of nuclear powerplants

  2. [Risk communication in construction of new nuclear power plant].

    Science.gov (United States)

    He, Gui-Zhen; Lü, Yong-Long

    2013-03-01

    Accompanied by construction of new nuclear power plants in the coming decades in China, risk management has become increasingly politicized and contentious. Nuclear risk communication is a critical component in helping individuals prepare for, respond to, and recover from nuclear power emergencies. It was discussed that awareness of trust and public attitudes are important determinants in nuclear power risk communication and management. However, there is limited knowledge about how to best communicate with at-risk populations around nuclear power plant in China. To bridge this gap, this study presented the attitudinal data from a field survey in under-building Haiyang nuclear power plant, Shandong Province to measure public support for and opposition to the local construction of nuclear power plant. The paper discussed the structure of the communication process from a descriptive point of view, recognizing the importance of trust and understanding the information openness. The results showed that decision-making on nuclear power was dominated by a closed "iron nuclear triangle" of national governmental agencies, state-owned nuclear enterprises and scientific experts. Public participation and public access to information on nuclear constructions and assessments have been marginal and media was a key information source. As information on nuclear power and related risks is very restricted in China, Chinese citizens (51%) tend to choose the government as the most trustworthy source. More respondents took the negative attitudes toward nuclear power plant construction around home. It drew on studies about risk communication to develop some guidelines for successful risk communication. The conclusions have vast implications for how we approach risk management in the future. The findings should be of interest to state and local emergency managers, community-based organizations, public health researchers, and policy makers.

  3. Improved monolithic reinforced concrete construction for nuclear power stations

    International Nuclear Information System (INIS)

    Guenther, P.; Fischer, K.

    1983-01-01

    Experience has shown that in applying monolithic reinforced concrete in nuclear power plant construction the following auxiliary means are useful: measuring sheets in assembling, welding gauges for reaching high tolerance accuracies of prefabricated reinforced concrete members, suitable lining materials, formwork anchorage and formwork release agents, concrete workability agents, mechanized procedures for finishing and assembling. These means were successfully tested in constructing the Greifswald nuclear power station

  4. Notes on organization of nuclear power station construction

    International Nuclear Information System (INIS)

    Marsicanin, B.

    1977-01-01

    After a visite to some european nuclear power stations under construction and in operation, in this report a short general view on this subject is given. The progress in this in large, industrialised countries is considered as well as the relevant experience in developing countries. The new role of nuclear research institutes during construction and operation is pointed out and prospects of this cooperation evaluated. (author)

  5. Liquid metal cooled nuclear reactor constructions

    International Nuclear Information System (INIS)

    Aspden, G.J.; Allbeson, K.F.

    1984-01-01

    In a liquid metal cooled nuclear reactor with a nuclear fuel assembly in a coolant-containing primary vessel housed within a concrete containment vault, there is thermal insulation to protect the concrete, the insulation being disposed between vessel and concrete and being hung from metal structure secured to and projecting from the concrete, the insulation consisting of a plurality of adjoining units each unit incorporating a pack of thermal insulating material and defining a contained void co-extensive with said pack and situated between pack and concrete, the void of each unit being connected to the voids of adjoining units so as to form continuous ducting for a fluid coolant. (author)

  6. Construction of a nuclear data server using TCP/IP

    Energy Technology Data Exchange (ETDEWEB)

    Kawano, Toshihiko; Sakai, Osamu [Kyushu Univ., Fukuoka (Japan)

    1997-03-01

    We construct a nuclear data server which provides data in the evaluated nuclear data library through the network by means of TCP/IP. The client is not necessarily a user but a computer program. Two examples with a prototype server program are demonstrated, the first is data transfer from the server to a user, and the second is to a computer program. (author)

  7. Nuclear anxiety: a test-construction study

    International Nuclear Information System (INIS)

    Braunstein, A.L.

    1986-01-01

    The Nuclear Anxiety Scale was administered to 263 undergraduate and graduate studies (on eight occasions in December, 1985 and January, 1986). (1) The obtained alpha coefficient was .91. This was significant at the .01 level, and demonstrated that the scale was internally homogeneous and consistent. (2) Item discrimination indices (point biserial correlation coefficients) computered for the thirty (30) items yielded a range of .25 to .64. All coefficients were significant at the .01 level, and all 30 items were retained as demonstrating significant discriminability. (3) The correlation between two administrations of the scale (with a 48-hour interval) was .83. This was significant at the .01 level, and demonstrated test-retest reliability and stability over time. (4) The point-biserial correlation coefficient between scores on the Nuclear Anxiety Scale, and the students' self-report of nuclear anxiety as being either a high or low ranked stressor, was .59. This was significant at the .01 level, and demonstrated concurrent validity. (5) The correlation coefficient between scores on the Nuclear Anxiety Scale and the Spielberger State-Trait Anxiety Inventory, A-Trait, (1970), was .41. This was significant at the .01 level, and demonstrated convergent validity. (6) The correlation coefficient between positively stated and negatively stated items (with scoring reversed) was .76. This was significant at the .01 level, and demonstrated freedom from response set bias

  8. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  9. Modularization in construction processes New Nuclear Power Plants

    International Nuclear Information System (INIS)

    Martinez, I.; Cobos, A.; Herrera Ropero, D.

    2012-01-01

    The aim of this work is that it has the capacity and expertise to analyze the suitability of modular technology design and construction compared to conventional nuclear plants. It will define the criteria for selecting the areas of modularity and the impact on design and its interfaces with engineering, supply, including logistics and construction.

  10. Preassembly method for construction of nuclear power station

    International Nuclear Information System (INIS)

    Shimazaki, Yasuyoshi

    1986-01-01

    Recently preassembly method for construction are generally popular in Japan and this trend is prevailing all over the world. They provide good solutions to the problems that the Japanese construction industry faces and also they meet the needs for construction of nuclear power plants having heavily reinforced concrete structures. We have already established basic technologies for the methods, developing more advanced methods (more systematic, larger sized, more applicable, etc.). In the near future, they will be further developed up to a complete system called 'Industrialized construction method'. This system will include the use of precast concrete component, steel concrete composit structures and construction robots. (author)

  11. New developments in nuclear power plant construction

    International Nuclear Information System (INIS)

    Bivens, A.C.

    1983-01-01

    Specific examples of construction activities are presented which demonstrate that excellent results have been achieved in the areas of cost, schedule and quality. Examples of innovation and development are given that would be particularly applicable to future work either for new plants or for plants not yet completed. (author)

  12. Modular construction approach for advanced nuclear plants

    International Nuclear Information System (INIS)

    Johnson, F.T.; Orr, R.S.; Boudreaux, C.P.

    1988-01-01

    Modular construction has been designated as one of the major features of the AP600 program, a small innovative 600-MW (electric) advanced light water reactor (ALWR) that is currently being developed by Westinghouse and its subcontractors. This program is sponsored by the US Department of Energy (DOE) in conjunction with several other DOE and Electric Power Research Institute ALWR programs. Two major objectives of the AP600 program are as follows: (1) to provide a cost of power competitive with other power generation alternatives; and (2) to provide a short construction schedule that can be met with a high degree of certainty. The AP600 plant addresses these objectives by providing a simplified plant design and an optimized plant arrangement that result in a significant reduction in the number and size of systems and components, minimizes the overall building volumes, and consequently reduces the required bulk quantities. However, only by adopting a modular construction approach for the AP600 can the full cost and schedule benefits be realized from the advances made in the plant systems design and plant arrangement. Modularization is instrumental in achieving both of the above objectives, but most of all, a total modularization approach is considered absolutely essential to ensure that an aggressive construction schedule can be met with a high degree of certainty

  13. The innovation and application of the nuclear power construction management information system MISNPC

    International Nuclear Information System (INIS)

    Wang Kaihua; Tang Zihui; Zhang Baiqi; Sun Guangwei; Zhu Guodong; Qian Fuhua

    2009-01-01

    This paper focuses on introducing the innovation achievements on the management information system of nuclear power construction (MISNPC). The innovation is achieved through summarizing the practice of nuclear power construction in China and drawing on advanced experience of international nuclear power construction. The innovation, including the management standard for nuclear power construction, the standard of construction process, the standard of nuclear-power basic codes and the standard for nuclear power construction and control, can be rapidly copied for application in various nuclear power construction projects. The application of the innovation may play an essential role in ensuring safe construction and operation of nuclear power plants in China and improving economic benefits. (authors)

  14. Nuclear power generation as seen from construction aspect

    International Nuclear Information System (INIS)

    Osaki, Yorihiko

    1984-01-01

    The measures to vitalize atomic energy industry in low economical growth age are grasped from the viewpoint of heightening the quality of technology, and the improvement of the economical efficiency of nuclear power generation as seen from construction aspect is discussed. By 2000, the nuclear power generation in Japan will be increased by about four times to 62 million kW, and the proportion of nuclear power increases steadily. Recently, the nuclear power stations in Japan have been stably operated at high level, and the capacity ratio has exceeded 70 %. However, the power generation cost tends to rise, and it is feared that the economical advantage over thermal power will be lost. Recently, the construction cost of nuclear power plants has continued to rise, which causes the high cost of nuclear power. The reason of the high construction cost is in short too much quantity of materials and long construction period. As the proposal to reduce the construction cost, three stages of the rationalization are discussed, such as the rationalization of simulated earthquake for design and the improvement of reactor building design. The promotion of technical development is indispensable for the cost reduction. (Kako, I.)

  15. Steel construction in the nuclear reprocessing industry

    International Nuclear Information System (INIS)

    Jordan, G.W.

    1990-01-01

    Over the past decade British Nuclear Fuels plc (BNFL) has pursued a large capital expenditure programme at Sellafield in Cumbria. This has used large quantities of structural steelwork. For example, Thorp plant for reprocessing spend AGR and LWR fuels, due for completion in 1992, has 20,000 tonnes. The design of these plants has been entrusted to BNFL Engineering based at Risley near Warrington, England. These safety-related structures are designed, as required by the Nuclear Installations Inspectorate, to withstand the effects of environmental hazards such as extremes of earthquake, wind, temperature, ice, snow, flooding, and lightning strikes. In some cases they may be subjected to impact loading from possible mishandling of lifted loads such as fuel transportation flasks. Design criteria for these structures have been developed by BNFL Engineering. Some examples are mentioned. (author)

  16. Strategies change as nuclear plant construction declines

    International Nuclear Information System (INIS)

    Knight, H.B.

    1980-01-01

    As conditions in the nuclear industry change some companies are taking a positive approach to falling orders by moving into the area of servicing existing plant. How Newport News Industrial Corporation has made just such a move by offering preventive maintenance services is described. The company has several advantages to offer: large existing facilities and a wide range of skills available from their 23000 employees. (author)

  17. Non-destructive control in nuclear construction

    International Nuclear Information System (INIS)

    Banus; Barbier; Launay

    1978-01-01

    Having recalled the characteristics of the fundamental components of the main primary circuit of nuclear boilers (900 MW) and the means appropriated for their control, it is recalled that the 'French Electricity Board's specifications and control rules' often prescribe more severe criteria than those existing in the U.S.A. Then practical examples of non-destructive controls concerning the steam generator end plates, vessel stainless steel linings, pump attachements, steam generator pipes are given [fr

  18. Construction, Maintenance and Demolition of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Smet, Camiel de [Hilti Corporation, P.O. Box 333, FL-9494 Schaan (Liechtenstein)

    2008-07-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  19. STACY and TRACY: nuclear criticality experimental facilities under construction

    International Nuclear Information System (INIS)

    Kobayashi, I.; Takeshita, I.; Yanagisawa, H.; Tsujino, T.

    1992-01-01

    Japan Atomic Energy Research Institute is constructing a Nuclear Fuel Cycle Safety Engineering Research Facility, NUCEF, where the following research themes essential for evaluating safety problems relating to back-end technology in nuclear fuel cycle facilities will be studied: nuclear criticality safety research; research on advanced reprocessing processes and partitioning; and research on transuranic waste treatment and disposal. To perform nuclear criticality safety research related to the reprocessing of light water reactor spent fuels, two criticality experimental facilities, STACY and TRACY, are under construction. STACY (Static Criticality Facility) will be used for the study of criticality conditions of solution fuels, uranium, plutonium and their mixtures. TRACY (Transient Criticality Facility) will be used to investigate criticality accident phenomena with uranium solutions. The construction progress and experimental programmes are described in this Paper. (author)

  20. Construction, Maintenance and Demolition of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Smet, Camiel de

    2008-01-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  1. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  2. Methodology for modular nuclear plant design and construction

    International Nuclear Information System (INIS)

    Lapp, C.W.; Golay, M.

    1992-01-01

    During the past decade, the rising cost of nuclear power plant construction has caused the cancellation of many projects and has forced some utilities into bankruptcy. Many factors have contributed to capital cost increases, including regulatory changes, the absence of standard designs, and low worker productivity. Low worker productivity can be attributed to the conventional building process, which is not conductive to productive labor. This study presents innovative ways to reduce the capital cost of nuclear plants through more efficient construction processes designed to increase worker productivity. A major portion of the plant capital cost is the interest paid during construction on borrowed capital. Modular fabrication could potentially reduce interest payments by compressing the construction schedule of nuclear facilities. Additional cost savings expected from modular designs arise from improved quality, productivity, and schedule control in fabrication of plant elements within a factory environment

  3. Construction of ideas and practice for 'nuclear geology featured database'

    International Nuclear Information System (INIS)

    Hu Guanglin; Feng Kai

    2010-01-01

    East China Institute of Technology is engaged in training person in areas of Nuclear Resource exploration. It is Nuclear Featured multi-Institute of Technology. At present, our library was done several collections system, which were focusing on Uranium and Geology. The library decide to be organizational force to construct Nuclear and Geology Featured database and put into use as soon as possible. 'Nuclear Geology Featured Database' put forward for construction principles of uniqueness, standardization, completeness, practicality, security and respecting knowledge property rights. The database contains 'Map and Table', 'periodical thesis', 'dissertations', 'conference papers', newspapers', 'books', ect. The types of literatures mainly includes monographs, periodicals, dissertations, conference papers, newspapers, as well as videos. The database can get information by ways of searching titles, authors and texts, and gradually become a more authoritative Nuclear Geology Database for study. (authors)

  4. Problems and prospects of nuclear power plants construction

    Directory of Open Access Journals (Sweden)

    Pergamenshhik Boris Klimentyevich

    2014-02-01

    Full Text Available 60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training.

  5. Application and development analysis of nuclear power plant modular construction

    International Nuclear Information System (INIS)

    Fang Xiaopeng

    2015-01-01

    Modular Construction is currently one of the major development trends for the nuclear power plant construction technology worldwide. In the first-of-a-kind AP1000 Nuclear Power Project practiced in China, the large-scale structural modules and mechanical modules have been successfully fabricated, assembled and installed. However, in the construction practice of the project, some quality issues are identified with the assembly and installation process of large-scale structural modules in addition to the issue of incomplete supply of mechanical modules, which has failed to fully demonstrate the features and merits of modular construction. This paper collects and consolidates the issues of modular construction of AP1000 first of a kind reactor, providing root cause analysis in the aspects of process design, quality control, site construction logic, interface management in the process of module fabrication, assembly and installation; modular construction feasibility assessment index is proved based on the quantification and qualitative analysis of the impact element. Based on the modular construction feasibility, NPP modular construction improvement suggestions are provided in the aspect of modular assembly optimization definition, tolerance control during the fitting process and the construction logic adjustment. (author)

  6. Containment vessel construction for nuclear power reactors

    International Nuclear Information System (INIS)

    Sulzer, H.D.; Coletti, J.L.

    1975-01-01

    A nuclear containment vessel houses an inner reactor housing structure whose outer wall is closely spaced from the inner wall of the containment vessel. The inner reactor housing structure is divided by an intermediate floor providing an upper chamber for housing the reactor and associated steam generators and a lower chamber directly therebeneath containing a pressure suppression pool. Communication between the upper chamber and the pressure suppression pool is established by conduits extending through the intermediate floor which terminate beneath the level of the pressure suppression pool and by inlet openings in the reactor housing wall beneath the level of the pressure suppression pool which communicate with the annulus formed between the outer wall of the reactor housing structure and the inner wall of the containment vessel. (Official Gazette)

  7. AP1000 plant construction in China: Ansaldo Nucleare contribution

    International Nuclear Information System (INIS)

    Frogheri, Monica; Saiu, Gianfranco

    2009-01-01

    On 24th of July 2007 Westinghouse Electric Co. signed landmark contracts with China's State Nuclear Power Technology Corporation (SNPTC), to provide four AP1000 nuclear power plants in China. The AP1000 is a two-loop 1117 MWe Pressurized Water Reactor (PWR). It is based on proven technology, but with an emphasis on safety features that rely on natural driving forces, such as pressurized gas, gravity flow, natural circulation flow and convection. Ansaldo Nucleare has provided a significant support to the passive plant technology development and, starting from 2000, is cooperating with Westinghouse to development of the AP1000 Plant. In the frame of the AP1000 Chinese agreement, Ansaldo Nucleare, in Joint Venture with Mangiarotti Nuclear, has signed a contract with Westinghouse for the design and the supply of innovative components to be installed in the first AP1000 unit to be constructed at the Sanmen site. The contract includes: the design of the steel containment vessel, preparation of construction and fabrication, specifications, design and supply of SCV mechanical penetrations, air locks and equipment hatches. Moreover, Ansaldo Nucleare is in charge of the final design of the AP1000 PRHR-HX and together with Mangiarotti Nuclear will supply the component for the Sanmen Unit 1 NPP. The paper presents an overview of the design and manufacturing activities performed by Ansaldo Nucleare and its partners for the AP1000 plant in China. (authors)

  8. Current problems associated with nuclear plant construction contracts

    International Nuclear Information System (INIS)

    Albano, Raffaele.

    1977-01-01

    The expansion of nuclear electricity generating programmes has brought to the fore the problems associated with construction of this type of power plant. The paper analyses the contracts for such construction and describes the most common, the turnkey contract. The present tendency is to limit the scope of turnkey contracts to the nuclear system or simply to the reactor and this is especially common in advanced nuclear countries such as the US, Canada, Japan, UK and France, and this is also the case in Italy where the question of contracting nuclear plants is debated. In Germany the power utilities hold a large number of shares in the manufacturing industry and the turnkey contract is therefore more economically attractive. A detailed description of the contracting procedure is provided, including the suppliers' and purchasers' responsibilities, plant commissioning tests and handing over of the plant to the operator. (NEA) [fr

  9. The Brazilian participation in the nuclear power plant construction

    International Nuclear Information System (INIS)

    Fabricio, R.A.C.

    1981-01-01

    A brief review about the origin of the brazilian nuclear power program and the strategy adopted for its implementation in Brazil is presented. The creation of the Nuclebras Engineering S/A, the Germany technology transfer and the personell job-training in Brasil are discussed. Some management models used for nuclear power plant construction in the world are still presented. (E.G.) [pt

  10. Development and construction of nuclear power and nuclear heating stations in the USSR

    International Nuclear Information System (INIS)

    Schmidt, G.; Kirmse, B.

    1983-01-01

    The state-of-the-art of nuclear power technology in the USSR is reviewed by presenting characteristic data on design and construction. The review takes into consideration the following types of facilities: Nuclear power stations with 1000 MWe pressurized water reactors, with 1000 MWe pressure tube boiling water reactors, and with 600 MWe fast breeder reactors; nuclear heating power stations with 1000 MWe reactors and nuclear heating stations with 500 MWth boiling water reactors

  11. Development of construction technology for nuclear power plants

    International Nuclear Information System (INIS)

    Schnellenbach, G.

    1975-01-01

    Stringent safety requirements for nuclear power plants create new technological problems in their construction. The development is influenced by the mode of operation of the respective reactors which leads to different construction styles of the reactor buildings. Accomodation of extraordinary load cases such as earthquake, airplane crash, and blast due to chemical explosions, requires additional treatment. Significant new problems arise for the prestressed concrete reactor pressure vessels and concrete containments, prestressed or reinforced. (orig.) [de

  12. Inspection of nuclear power plants under construction in Spain

    International Nuclear Information System (INIS)

    Santoma, L.

    1977-01-01

    Brief summary of the situation of the nuclear industry in Spain, in order to better understand the questions involved in the inspection of the Spanish nuclear power plants, as well as the experience acquired, followed by a description of some of the problems which have arisen during the construction phase. Also the problems faced by the Inspection of the Junta de Energia Nuclear are described in order to fulfill the missions entrusted to it. Finally, some recommendations are made in light of the experience had by Spain.(author) [es

  13. Construction permit of nuclear power plants in case of leasing

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Guiding lines (unofficial): 1. A leasing company can be founded to finance and to operate a nuclear power plant. 2. The leasing company does not require a license according to section 7 of the Atomic Energy Act, for it neither constructs nor posesses the nuclear power plant. 3. This also applies if the proprietor, and later on operator, of the nuclear power plant holds an interest in this leasing company as a shareholder. Section 7, and 19 subsection 3 of the Atomic Energy Act. Higher Administrative Court of Rhineland Palatinate, Decision of July 20sup(th), 1982. (orig.) [de

  14. The supply chain of civil construction industries for support the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana; Moch-Djoko Birmano; Sahala Lumbanraja; Nurlaila

    2013-01-01

    The use of domestic products for electricity infrastructure has been set out in the Ministerial Decree number: 54/M-IND/PER/3/2012, but the infrastructure of nuclear power plants (NPP) construction has not been included. Therefore, the potential of the local industries needs to be mapped it especially supply chain of civil construction industries to estimate the capability of the local component level (DCL) at the nuclear power plant project in Indonesia. NPP is a high-technology so that if NPP will be constructed, it is necessary to involve the national capability as media technology transfer, especially for EPC (Engineering, Procurement and Construction) services. Civil construction (civil part) play role is very large, about 21%. Therefore it is necessary in particular the role of the national civil construction industry to increase the capability of local content. Preparation of Civil construction infrastructure are depend on the supply chain of raw materials. The aim of the research was to map the supply chain of the civil construction industries. Methodology this study is a survey of national industries, literature review, and searching web site. The result study is a map of civil construction industries with raw material supply chain. (author)

  15. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  16. Quality assurance during site construction of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations related to the establishment and implementation of a quality assurance programme for the site construction activities at nuclear power plants. These include activities such as fabricating, erecting, installing, handling, storing, cleaning, flushing, inspecting, testing, modifying, repairing, and maintaining

  17. Pretension construction of safety shell in Chashma nuclear power plant

    International Nuclear Information System (INIS)

    Gong Zhenbin; Li Yinong; Ni Shaowen

    1999-01-01

    19T16 post-tension grouped anchor system is applied to the safety shell pretension in Chashma Nuclear Power Plant. The stretching force of each bundle is about 3800 kN and the prestressed reinforcement is stretched in five stages. The double-control measurement of stress controlling and extension checking is applied in strict accordance with the principle of symmetrical construction

  18. EVMS for nuclear power plant construction: status and implementation

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.; Park, S. Y.

    2012-01-01

    The Earned Value Management System (EVMS) method integrates three critical elements of project management scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows for casting of project cost and schedule at completion and highlights the possible need for corrective action. It is anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners. This paper is to review the status of EVMS and its effective implementation to nuclear power plant construction

  19. Optimalisation of national industry participation in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sriyana

    2008-01-01

    A study of national industry participation based on recent data has already been conducted. The current industry data is used to estimate the optimum level of national industry participation in nuclear power plant (NPP) construction based on the prior study. The purpose of the study is to give a figure of the optimum level of national industry participation in NPP construction. The scope of the study is the NPP construction project in related to the potency of national industry to participate in the project. The methodology used in the study are literature study, web surfing for industrial data, and on-the-spot industry survey that are potential to participate in NPP construction. In addition to that, discussion with expertise of industrial practitioner was also conducted. The study concludes that (1) based on the recent national industry capability provided and compared to prior similar study, it is estimated that the level of national industry participation in the first NPP construction with the capacity of 1000 MWe PWR is about 40%. (2) to accelerate NPP technology transfer, we need to build a small size NPP. The nuclear island will be developed by BATAN in cooperation with national industry and the non-nuclear island will be developed by national industry. Universities and other academicians should be involved to support and keep the sustainability of man power availability in developing the NPP technology. (author)

  20. Nuclear civil construction, an essential activity dedicated to outstanding projects

    International Nuclear Information System (INIS)

    Herve, G.

    2016-01-01

    The complexity of nuclear civil construction is directly linked to the safety requirements imposed on nuclear facilities: durability in terms of time, stability, containment, tightness, managing cracking and leakages, quality controls... These requirements imply specific measures for instance the concrete that is used for the containment building has a particular composition that gives it an enhanced resistance or the substantial thickness of the foundation raft implies monitoring the temperature at which the concrete is poured. The construction of the EPR at the Flamanville site is taken as an example. This construction involves 120.000 tonnes of concrete-reinforcement steels, 400.000 m"3 of concrete, 400 km of pipes and 1600 km of cables. (A.C.)

  1. Popularization of the role of nuclear power construction

    International Nuclear Information System (INIS)

    Zhang Ying

    2010-01-01

    Scientific popularization shall be promoted in advance before nuclear power development. Since it was founded, Jiangsu Nuclear Power Corporation (JNPC) has always focused on the popularization of nuclear power knowledge to enable the public understand and access to nuclear power. Adhering to the center 'Popularizing nuclear power knowledge, correct steering of the public, serving the construction of TNPS and promoting the corporation development', the way of 'going out and coming in' for publicizing nuclear power knowledge has been gradually formed in line with the principle of 'close to the society, close to the people and close to the life'. The scientific popularization resources have been deeply dug out, and the education mode innovated. The healthy and continuous development of scientific popularization and education work are recognized and appraised highly by all circles of the society. Nowadays, a good atmosphere of 'everyone contends to popularize nuclear power knowledge' has formed in JNPC, and internal and external popularization and education work have yielded good results, which have created favorable social environment for the safe, proper and fast development of Tianwan Nuclear Power Station. (author)

  2. The technical feasibility of uranium enrichment for nuclear bomb construction at the parallel nuclear program plant

    International Nuclear Information System (INIS)

    Rosa, L.P.

    1990-01-01

    It is discussed the hole of the Parallel Nuclear Program is Brazil and the feasibility of uranium enrichment for nuclear bomb construction. This program involves two research centers, one belonging to the brazilian navy and another to the aeronautics. Some other brazilian institutes like CTA, IPEN, COPESP and CETEX and also taking part in the program. (A.C.A.S.)

  3. Innovation in civil construction system of nuclear power plant

    International Nuclear Information System (INIS)

    Takami, Masahiro

    1996-01-01

    Nowadays, the computer-aided production systems have been already introduced to almost all kinds of industries. The construction industry, which has been said to be conservative for the modernization of production system, now expects the CIC (Computer Integrated Construction) as the means to innovate the construction production process. Shimizu Corporation has developed the new computer-aided production system, 'SIPS: Shimizu Integrated Production System', and has used it in the actual construction projects. In the system, the computer supports every phase of construction projects like market researching, design, material purchase, construction work, and maintenance. The project of Kashiwazaki-kariwa Nuclear Power Station Unit No.7 is one of the model cases. Here we applied following three concepts, (1) the full use and integration of 3D-CAD data-base through all phases of construction, (2) the setting-up of the information network system among the site office, the head office, and the mechanical and electrical manufacturer, (3) the introduction of advanced construction technologies such as large block prefabrication method. (author)

  4. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  5. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  6. The innovation of nuclear science and technology supporting for the central plains economic zone construction

    International Nuclear Information System (INIS)

    Yang Xiaowei

    2014-01-01

    This paper discusses the nuclear agronomy support for the central plains economic zone construction, radiation chemical new material support for the central plains economic zone construction, nuclear medical support for the central plains economic zone construction, nuclear instrument and meter industry support for the central plains economic zone construction and the development trend of related disciplines. (author)

  7. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  8. Canadian nuclear power plant construction cost forecast and analysis

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequence of the decision as possible. This understanding must be provided by the evaluation of the situation to take place in the future. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A data base is built and indexes are prepared. Based on these indexes an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of forty years are generated and applications of alternative scenario forecasts and range forecasts to uncertainty assessment are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the very first ever done for Canadian NGS constructions

  9. Port construction works in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Narahara, Akio; Minamata, Hisashi; Harada, Kensaku

    1982-01-01

    Sendai Nuclear Power Station is the second nuclear power station of Kyushu Electric Power Co., Inc., with two PWR plants of 890 MW each, and the operation of No.1 plant will be started in July, 1984, and that of No.2 plant in March, 1986. The civil engineering works for both plants were started in June, 1978, and March, 1981, respectively, and the rate of progress as of the end of September, 1982, was 97 % and 66 %, respectively. In the construction of this power station, the port facility was provided for the transport of construction materials and spent fuel, and for the intake of condenser cooling water. In order to make the construction by dry work, the double cofferdam structures with steel sheet piles were made offshore. The use of the wharf was started in March, 1980, though typhoons hit the area several times, and the dredging in the port was completed in May, 1982. The outline of the plan of this power station, the state of affairs before the start of construction, the outline of the port construction works, the topography, geological features and sea conditions, the design of the port such as breakwaters, unloading wharf and water intake, the manufacture and installation of caissons, dredging, and the temporary cofferdam works for water intake are described. (author)

  10. Major factors influencing craft productivity in nuclear power plant construction

    International Nuclear Information System (INIS)

    Borcherding, J.D.; Sebastian, S.J.

    1980-01-01

    This paper reports on a research study whose objective was to determine the most influential factors adversely affecting craft productivity in nuclear power plant construction from the perspective of the tradesmen employed at the sites. Data were collected through the use of a questionnaire survey and group interview sessions, predominantly with workmen, at six nuclear power plant construction projects. Craftsmen were chosen as the major data base because of their awareness of how their time would actually be spent on the project. Topics considered include the factors influencing craft productivity, material availability, redoing work, crew interfacing, overcrowded work areas, instruction time, inspection delays, craft turnover, craft absenteeism, foreman changes, foreman incompetence, engineering design lead time, comprehensive scheduling of the design function, the responsibility of the utility, value engineering, plant standardization, the effective utilization of the planning and scheduling system, and the labor-management committee

  11. Progressive building methods in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sikura, V.

    1980-01-01

    A detailed description is given of the new prospective technologies used in the construction of the Bohunice V-1 nuclear power plant. They include the use of steel and large-area forms, the use of profile sheets as a substitute for forms, assembled raw partitions, wall shells consisting of clamped porous concrete slabs, assembled roof shells, special finish of concrete walls, bearing wall deep foundation, the use of modern building machinery for concreting, reinforcing and welding works. (M.S.)

  12. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  13. Nuclear reactor internals construction and failed fuel rod detection system

    International Nuclear Information System (INIS)

    Frisch, E.; Andrews, H.N.

    1976-01-01

    A system is provided for determining during operation of a nuclear reactor having fluid pressure operated control rod mechanisms the exact location of a fuel assembly with a defective fuel rod. The construction of the reactor internals is simplified in a manner to facilitate the testing for defective fuel rods and the reduce the cost of producing the upper internals of the reactor. 13 claims, 10 drawing figures

  14. The management of design interfaces in the nuclear power construction

    International Nuclear Information System (INIS)

    Lv Shubao

    2005-01-01

    This paper introduces the design interfaces management in the construction of nuclear power plant through the Interface Control Manual (ICM). The ICM management model had been applied and practiced in the construction of both DAYA BAY and LING AO phase I (LNPS I ) nuclear power stations. It has solved many troublesome matters in the design interfaces information exchange among all concerned parties, and contributed to these projects greatly. The author considers that the ICM management: has great value for extending and applying in the new construction of nuclear power station. In order to understand easily the ICM management model, the paper expatiates on the compiling principle, the procedure establishing, the interface editing and the ICM updating. The advantages of using ICM are as follow: First, the ICM model provides the authoritative and legal document to be obeyed by all contractors for exchanging the design technical information basing on the responsibility and planning. Second, the ICM enhances the schedule control for the project engineering. Third, using ICM to manage the design information exchange solves the questions assorted with different parties, and decreases the times spent in unproductive coordination meeting. Fourth, the ICM management uses computer database and provides convenient method for engineers to track and control interface exchange, gets twice the result with half the effort. Fifth, the ICM database allows easy retrieval of any technical information for further re-use in a similar project. (authors)

  15. Evaluation for rigidity of box construction of nuclear reactor building

    International Nuclear Information System (INIS)

    Yamakawa, Tetsuo

    1979-01-01

    A huge box-shaped structure (hereafter, called box construction) of reinforced concrete is presently utilized as the reactor building structure in nuclear power plants. Evaluation of the rigidity of the huge box construction is required for making a vibration analysis model of nuclear reactor buildings. It is necessary to handle the box construction as the plates to which the force in plane is applied. This paper describes that the bending theory in elementary beam theory is equivalent to a peculiar, orthogonally anisotropic plate, the shearing rigidity and film rigidity in y direction of which are put to infinity and the Poisson's ratio is put to zero, viewed from the two-dimensional theory of elasticity. The form factor of 1.2 for shearing deformation in rectangular cross section was calculated from the parabolic distribution of shearing stress intensity, and it is the maximum value. The factor is equal to 1.2 for slender beams, but smaller than 1.2 for short and thick beams, having tendency to converge to 1.0. The non-conformity of boundary conditions regarding the shearing force at the both ends of cantilevers does not affect very seriously the evaluation of shearing rigidity. From the above results, it was found that the application of the theory to the box construction was able to give the rigidity evaluation with sufficient engineering accuracy. The theory can also be applied to the evaluation of tube type ultrahigh buildings. (Wakatsuki, Y.)

  16. Computer aided construction engineering system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Nakajima, Akira; Miyahara, Ryohei; Miura, Jun

    1990-01-01

    The construction CAE system for nuclear power plants is the tool for the construction work simulator (procedure, processes and management simulation) connected to 3D-CAD (three-dimensional plant layout planning CAD). The data used for construction work simulation are registered in the data base as the installation smallest unit data from the 3D-CAD. This construction work simulator comprises the automatic installation procedure decision system, with which a construction planner decides installation procedure by using a high performance graphic work station, and based on a 3D-CAD model, utilizing empirical procedure logic, the dialogue system for making the installation procedure more optimal by utilizing effectively the graphic function, the evaluation system for synthetically evaluating workability, personnel plan and so on by adding the simulation of human behavior based on these procedures, the schedule system which carries out work process simulation based on the above, the data base system for letting to do these plans effectively and the project management system. By means of these, the plant construction of high quality is expected. (K.I.)

  17. 4D Simulation for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Jeong, Seo G.; Suh, Kune Y.

    2006-01-01

    For the timely and competitive response to rapidly changing energy environment at the turn of millennium, there is a desperate need to build the nuclear power plant (NPP) in the virtual reality of digital engineering prior to commissioning. To construct a NPP is a highly integrated, voluminous project. Verification of design and initial planning is prerequisite to construction to confirm optimal fabrication and high productivity. This paper presents the design feasibility by simulating the initial construction plan of NPP using four-dimensional (4D) simulation. The virtual reality method, using three dimensional (3D) computer-aided design (CAD) model, enables various designs in the project launching stage to be promptly and exactly previewed

  18. Licensing for the construction of 'Almirante Alvaro Alberto' nuclear power plant

    International Nuclear Information System (INIS)

    1974-09-01

    The BRAZILIAN NUCLEAR ENERGIA COMMISSION (Comissao Nacional de Energia Nuclear - CNEN) presents in Report n 0 51 of its Reactors Department all the requirements for the construction permit of 'Almirante Alvaro Alberto' Nuclear Power Plant [pt

  19. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  20. Concerning the structure of occupational accidents involving construction workers in the erection of nuclear power plants

    International Nuclear Information System (INIS)

    Nowak, B.; Roebenack, K.D.

    1991-01-01

    An investigation of 561 occupational accidents involving construction workers which took place during the construction of nuclear power plants failed to show any significant deviation in comparison with general construction as regards process classification, classification of accidents according to occupation and situation, and accidents severity. Occupational accidents which are typial for nuclear power plant construction are a rare exception. (orig.) [de

  1. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  2. Construction times and the decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Erramuspe, H.J.

    1988-01-01

    The construction and the decommissioning periods of nuclear power plants (NPP), are studied, due to their importance in the generation costs. With reference to the construction periods of these plants, a review is made of the situation and technical improvements made in different countries, with the purpose of shortening them. In regard to the decommissioning of NPP, the present and future situations are reviewed in connection with different stages of decommissioning and their related problems, as the residual radioactivity of different components, and the size of the final wastes to be disposed of. The possibilities of plant life extensions are also revised in connection with these problems. Finally, the expected decommissioning costs are analyzed. (Author) [es

  3. Nuclear Power Plants. Construction status report, data as of February 28, 1978

    International Nuclear Information System (INIS)

    1978-03-01

    Data on the construction status of nuclear power plants in the US as of February 28, 1978 are presented. The data include licensing activities affecting the construction as well as detailed information on construction activities and schedules

  4. Nuclear power plants. Construction status report, data as of April 30, 1978

    International Nuclear Information System (INIS)

    1978-05-01

    Data on the construction status of nuclear power plants in the U.S. as of April 30, 1978 are presented. The data include licensing activities affecting the construction as well as detailed information on construction activities and schedules

  5. Forecasting manpower requirements for nuclear power plant construction

    International Nuclear Information System (INIS)

    Seltzer, N.; Schriver, W.R.

    1978-01-01

    This paper presents both the methodology and results of a segment of a comprehensive construction manpower demand forecasting system aimed at forecasting virtually all construction manpower requirements in the United States of America. The part of the system dealing with the demand for construction workers needed to build nuclear powered electricity generating plants is discussed here. The object of the system is to forecast manpower construction needs for each of 29 construction crafts on a monthly basis in each of 10 geographical regions of the United States. The method used is to establish profiles of the types of workers and time phasing required in the past. Profiling was done for different types of plants, different capacity classes, and different geographical locations. An appropriate worker profile matrix cannot simply be multiplied by the capacity of the proposed plant if the number of man-hours required per kilowatt of generating capacity is not constant. The value of this latter variable has changed considerably recently - presumably because of an increased awareness of environmental and safety considerations. Econometric techniques are used to forecast values for man-hours per kilowatt which are then multiplied by projected new capacity to be put in place. The resulting total man-hour requirement is then allocated over time and by craft through use of a worker profile matrix. The summary results indicate that 20 percent increases in man-hours required per kilowatt of capacity can be expected between 1977 and 1981. Total construction labour demand will rise from 65,700 work-years in 1977 to nearly 96,600 work-years in 1981. Forecasts of the actual number of different types of workers to be demanded in each month and in each region are available from the system. (author)

  6. Mitsubishi nuclear technologies and construction of new Bohunice

    International Nuclear Information System (INIS)

    Yoshizu, T.

    2009-01-01

    Mitsubishi Heavy Industries (MHI) has setup Generation III+ category power plant technologies both in large and middle size reactors as a key player in the global market of nuclear plant suppliers. MHI has developed 1,700 MWe class Advanced Pressurized Water Reactor for European utilities, EU-APWR, utilizing the APWR technology in Japan. The plant configuration is based on the proven technologies from MHI's ample experiences, but various advanced technologies are adopted to achieve enhanced safety, reliability, and economy. For the regions without large grid capacity, middle-sized nuclear power plant will be an attractive option for the utilities. Joint Venture ATMEA with AREVA NP will serve ATMEA1. The ATMEA1 will offer 1,100 MWe output with superior operation performance based on reliable and proven technologies. Mitsubishi has experience of half century for all of 26 PWR plants in Japan. The latest plant is Tomari Unit 3 of 1,000 MWe, which has completed the construction work and now in the final commissioning test. Tomari Unit 3 applies some advanced technologies such as all digital I and C, which are to be implemented in the EU-APWR. Based on this construction experience, Mitsubishi can contribute any kind of demands for New Bohunice 5 th unit project with the total engineering capability. (author)

  7. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  8. Engineer, procure, construct (EPC) for nuclear projects in OPG

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, M. [Ontario Power Generation, Toronto, Ontario (Canada)

    2011-07-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  9. Engineer, procure, construct (EPC) for nuclear projects in OPG

    International Nuclear Information System (INIS)

    Elliott, M.

    2011-01-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  10. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    You, Y. M. [PHILOSOPHIA, Inc., Seoul (Korea, Republic of); Suh, K. Y. [Seoul National Univ., Seoul (Korea, Republic of)

    2009-10-15

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4{sup +}D) Technology{sup TM} resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4{sup +}D Technology{sup TM} in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4{sup +}D Technology{sup TM} anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4{sup +}D Technology{sup TM} lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space.

  11. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    You, Y. M.; Suh, K. Y.

    2009-01-01

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4 + D) Technology TM resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4 + D Technology TM in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4 + D Technology TM anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4 + D Technology TM lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space

  12. Construction of overseas nuclear power plants for first time by Japanese industry

    International Nuclear Information System (INIS)

    Maruyama, Tohru; Naruse, Yoshihiro; Yabuta, Hitoshi

    2010-01-01

    In response to the worldwide demand for stable energy supplies and the reduction of greenhouse gas emissions, nuclear power plant construction projects have been expanding on a global scale. Even in the United States, where no nuclear power plants have been constructed over the past 30 years, there are plans for the construction of more than 30 plants. Toshiba has been awarded a contract for a nuclear power plant construction project in the U.S., the first case of overseas nuclear power plant construction by Japanese industry. Toshiba America Nuclear Energy Corporation (TANE), the first U.S. subsidiary in our nuclear business, located in Charlotte, North Carolina, is engaged in this globally prominent project, applying various technologies and know-how that we have cultivated over many years of experience in developing and constructing nuclear power plants in Japan and adapting them to U.S. business practices, laws, and regulations. (author)

  13. Risk management and nuclear human resources management in construction nuclear power plants in the Gulf Countries

    International Nuclear Information System (INIS)

    Saeed Hakami; Salim Almarmary

    2009-01-01

    The countries of the Gulf region have the capacity to rapidly expand their economic growth and gross domestic product (GDP). Also, one may observe that their growth rate is very high. To match this, they need a mix of energy sources for this economic growth. Nuclear power plants can have a significant role as a source of energy in the Gulf countries. Although, some of the Gulf countries signed contracts to construct nuclear power plants, they still require high a level of education as well as sufficient and adequate human resources in order to solve complex issues which may happen at nuclear power plants. The objective of this paper is to identify the complex issues that may arise at a nuclear site. Then the paper goes on to discuss how to evaluate these issues. Finally, the paper studies how to manage and control such complex issues in the work place. The advantage of highly educated people as well as sufficient and adequate human resource can increasingly protect and save human health and the natural environment from issues relating to the use of nuclear energy. There are vast theories, strategies and tools that have discussed in regards to human resources management in the nuclear industries. However, this paper chiefly provides a new risk management methodology. This methodology helps to highlight the risk factors and their consequences at nuclear sites. This paper is intended to decrease risks; to protect human health in the work place at nuclear power plants and save the environment within and beyond national borders and for future generations. It aims to increase safety from the use of nuclear energy, particularly in the Gulf countries.(Author)

  14. New experience on construction and installation work in Qinshan PHWR nuclear power plant

    International Nuclear Information System (INIS)

    Lu Huaxiang

    2004-01-01

    The article provides a summary of the new experience on construction management and construction technology in the field of civil construction and installation work in Qinshan PHWR nuclear power plant, with focus on innovation in project management mode, new technology application and computerized management of construction and installation work. Management innovation, technical innovation and information technology are the key contributors to overall success of Qinshan PHWR nuclear power plant in construction and installation work. The new experience derived in these fields will be of great significance to promote independent construction of the new-round nuclear power projects in China. (author)

  15. A Study on Nonconformance and Construction Method Improvement for Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Jong Yeob; Roh, Myung Sub

    2014-01-01

    Advanced power reactor was developed by domestic technology, and finally exported to abroad. In order to place the current nuclear power industrial base, construction has played a big role. Without magnificent construction technology, it would have been impossible to get a safe nuclear power plant on time and in budget. Construction industry occupies very large portion of the economy in South Korea and it has been a core of South Korea's economic growth. With a competitive construction industry and advanced nuclear power plant construction know-how, South Korea could provide safe and reliable nuclear power plants in domestic and world. However there are many repairs and number of corrective actions are in actual construction. Thus, this paper suggested the result of nonconformance and construction method improvement for nuclear power plant. Constructional engineering is a kind of science that has a variety of disciplines including structure, geology, mechanical equipment and other fields. Thus, the development of constructional engineering is closely associated with experience from failure and application advanced construction method. The recent experience in nuclear power plants construction has shown that those improved methods are fully applicable and can help shorten the construction schedule. The future of nuclear power plant construction seems to be more encouraged, even though it has many obstacles

  16. Construction and engineering report for advanced nuclear fuel development facility

    International Nuclear Information System (INIS)

    Cho, S. W.; Park, J. S.; Kwon, S.J.; Lee, K. W.; Kim, I. J.; Yu, C. H.

    2003-09-01

    The design and construction of the fuel technology development facility was aimed to accommodate general nuclear fuel research and development for the HANARO fuel fabrication and advanced fuel researches. 1. Building size and room function 1) Building total area : approx. 3,618m 2 , basement 1st floor, ground 3th floor 2) Room function : basement floor(machine room, electrical room, radioactive waste tank room), 1st floor(research reactor fuel fabrication facility, pyroprocess lab., metal fuel lab., nondestructive lab., pellet processing lab., access control room, sintering lab., etc), 2nd floor(thermal properties measurement lab., pellet characterization lab., powder analysis lab., microstructure analysis lab., etc), 3rd floor(AHU and ACU Room) 2. Special facility equipment 1) Environmental pollution protection equipment : ACU(2sets), 2) Emergency operating system : diesel generator(1set), 3) Nuclear material handle, storage and transport system : overhead crane(3sets), monorail hoist(1set), jib crane(2sets), tank(1set) 4) Air conditioning unit facility : AHU(3sets), packaged air conditioning unit(5sets), 5) Automatic control system and fire protection system : central control equipment(1set), lon device(1set), fire hose cabinet(3sets), fire pump(3sets) etc

  17. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  18. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  19. Current status of construction of nuclear power plants No. 7, No. 8 in Korea

    International Nuclear Information System (INIS)

    Sug, S.H.

    1979-01-01

    The up-to-date accomplishment and future work in the construction of nuclear power plants in Korea are outlined. The scope of the construction project of the No. 7 and No. 8 power plants, selection of the suppliers of the main instruments, assessment of the planning, architecture, engineering, construction fund, procurement of nuclear fuel, and the necessities of home production of various nuclear materials are briefly summarized. (author)

  20. Self-reliance and innovation to improve the localization ability of nuclear power construction

    International Nuclear Information System (INIS)

    Wu Chongming

    2008-01-01

    Construction is a crucial link in the course of design, site selection, construction and operation for a nuclear power plant. The quality during construction directly affects the nuclear safety. And the construction quality involves various aspects including quality culture, feasibility of construction technique, quality assurance, and quality control. Through technical management innovation, great achievements have been made in the civil construction of Unit 3 of Qinshan II Extension Project. As a result, the construction period was shortened and the concrete quality reached the fairfaced concrete standard. (authors)

  1. Analysis on optimization of the critical path for civil construction period of Fangjiashan nuclear island constructed under EPC mode

    International Nuclear Information System (INIS)

    Liu Yongqing; Wu Youcong; Qiu Jinhong

    2011-01-01

    Based on the actual situation of nuclear island civil construction in Fangjiashan nuclear power plant and combined with the arrangement of the construction schedule, the analysis on optimization of the critical path for civil construction period is conducted. The result shows that on the premise of not increasing the contract price and the total engineering cost based on the original 57-month construction period, the construction period can be shorten to 21 month through strengthening the schedule control, keeping the critical work in a reasonable duration and rearranging the link between programmers. In addition, in view of the economic analysis, if we increase the mechanical engagement and adopt special method, the 2-month construction period can be even shortened to 20 months. (authors)

  2. Quality control of Ling'ao nuclear power station civil construction

    International Nuclear Information System (INIS)

    Lu Buliang; Ye Changyuan

    2001-01-01

    Based on the quality control model adopted during Ling'ao Nuclear Power Station construction, the author briefly introduces quality control process of some main civil construction activities (reinforced concrete, steel liner, steel works and prestressing force) of nuclear power station, and makes some descriptions on non-conformance control of civil works. These quality control processes described come from the concrete practice during civil construction of Ling'ao Nuclear Power Station, and are based on Daya Bay Nuclear Power Station construction experience

  3. Round table: The New Constructions; New Build; IAEA Services Nuclear Power Reactor Technologies Construction and Operation

    International Nuclear Information System (INIS)

    Choho, Tarik; Ward, Tony; Koshy, Thomas; )

    2014-01-01

    The first round-table of Atoms for the Future 2014 focused on the topic of 'The new construction'. Attendees had the opportunity to see Tarik Choho, Chief Commercial Executive Officer at AREVA, Tony Ward, Partner and Head of Power and Utilities at EY, as well as Thomas Koshy, Head of Nuclear Power technology Development Section at the IAEA, share their respective point of view and discuss together. They first started with their own presentation before sitting together at the discussion panel. Tarik Choho explained that there are many opportunities for new builds around the world, and especially in new comer countries. Thomas Koshy brought his expert point of view as an international regulator. He showed that the technology landscape also includes new designs as well as non-electricity generation uses. Those two aspects could bring both opportunities and challenges for licensing. Tony Ward showed how difficult it was to finance such a capitalistically intensive project as a new build, and how one could try to find an electricity retail price which is acceptable for both the general private consumer and the plant operator. All speakers agreed that preparation was core to a nuclear new build project. They also pointed out that every project involves more and more actors, and that it could be challenging to let everyone have the appropriate say

  4. The analysis of energy-time sequences in the nuclear power plants construction

    International Nuclear Information System (INIS)

    Milivojevic, S.; Jovanovic, V.; Riznic, J.

    1983-01-01

    The current nuclear energy development pose many problems; one of them is nuclear power plant construction. They are evaluated energy and time features of the construction and their relative ratios by the analysis of available data. The results point at the reached efficiency of the construction and, in the same time, they are the basis for real estimation of energy-time sequences of the construction in the future. (author)

  5. Rationalizing of construction engineering of nuclear power plants with pressurized water reactors

    International Nuclear Information System (INIS)

    Schmidt, S.

    1977-01-01

    Construction of large power plants requires further reduction of construction efforts and the construction period. A new constructional and technological solution has been developed with the steel-cell composite structure applied in the Greifswald nuclear power plant 'Bruno Leuschner' for the first time. Principles of design, fabrication, transport, and mounting are described. The benefits of the method are indicated. (author)

  6. Delays in nuclear power plant construction. Progress report, September 15, 1976--September 14, 1977

    International Nuclear Information System (INIS)

    Mason, G.E.; Larew, R.E.

    1977-01-01

    This report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts that should minimize or eliminate the identified barriers. The identified barriers include: (1) design and construction interfacing problems; (2) problems relating to the selection and use of permanent materials and construction methods; (3) construction coordination and communication problems; and (4) problems associated with manpower availability and productivity;

  7. Nuclear reactor construction with bottom supported reactor vessel

    International Nuclear Information System (INIS)

    Sharbaugh, J.E.

    1987-01-01

    This patent describes an improved liquid metal nuclear reactor construction comprising: (a) a nuclear reactor core having a bottom platform support structure; (b) a reactor vessel for holding a large pool of low pressure liquid metal coolant and housing the core; (c) a containment structure surrounding the reactor vessel and having a sidewall spaced outwardly from the reactor vessel side wall and having a base mat spaced below the reactor vessel bottom end wall; (d) a central small diameter post anchored to the containment structure base mat and extending upwardly to the reactor vessel to axially fix the bottom end wall of the reactor vessel and provide a center column support for the lower end of the reactor core; (e) annular support structure disposed in the reactor vessel on the bottom end wall and extending about the lower end of the core; (f) structural support means disposed between the containment structure base mat and bottom end of the reactor vessel wall and cooperating for supporting the reactor vessel at its bottom end wall on the containment structure base mat to allow the reactor vessel to expand radially but substantially prevent any lateral motions that might be imposed by the occurrence of a seismic event; (g) a bed of insulating material disposed between the containment structure base mat and the bottom end wall of the reactor vessel and uniformly supporting the reactor vessel at its bottom end wall; freely expand radially from the central post as it heats up while providing continuous support thereof; (h) a deck supported upon the wall of the containment vessel above the top open end of the reactor vessel; and (i) extendible and retractable coupling means extending between the deck and the top open end of the reactor vessel and flexibly and sealably interconnecting the reactor vessel at its top end to the deck

  8. Construction of APR1000 nuclear power information management system based on international standards

    International Nuclear Information System (INIS)

    Choi, Seung Hwan; Song, Deok Yong; Han, Byung Sub; An, Kyung Ik; Hwang, Jin Sang

    2010-01-01

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  9. Construction of APR1000 nuclear power information management system based on international standards

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Seung Hwan [Korea Electric Power Research Institute, Daejeon (Korea, Republic of); Song, Deok Yong; Han, Byung Sub [Enesys Co., Daejeon (Korea, Republic of); An, Kyung Ik; Hwang, Jin Sang [PartDB Co., Daejeon (Korea, Republic of)

    2010-10-15

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  10. Nuclear spectrum influence on North Korean and Japanese identity constructs

    International Nuclear Information System (INIS)

    Fernandez-Gallois, Yohann

    2017-01-01

    This article introduces the concept of 'nuclear spectrum' which reflects the ability of nuclear weapons to produce effects in diplomatic and strategic fields. The author analyzes the influence of the American nuclear spectrum in East Asia and the interactions with the nuclear spectra of North Korea and Japan. He shows that the American nuclear umbrella deeply influences the inter-state relations between the two Korea and Japan

  11. Improved nuclear reactor construction with bottom supported reactor vessel

    International Nuclear Information System (INIS)

    Sharbaugh, J.E.

    1987-01-01

    An improved liquid metal nuclear reactor construction has a reactor core and a generally cylindrical reactor vessel for holding liquid metal coolant and housing the core within the pool. A generally cylindrical concrete containment structure surrounds the reactor vessel and a central support pedestal is anchored to the containment structure base mat and supports the bottom wall of the reactor vessel and the reactor core. The periphery of the reactor vessel bore is supported by an annular structure which allows thermal expansion but not seismic motion of the vessel, and a bed of thermally insulating material uniformly supports the vessel base whilst allowing expansion thereof. A guard ring prevents lateral seismic motion of the upper end of the reactor vessel. The periphery of the core is supported by an annular structure supported by the vessel base and keyed to the vessel wall so as to be able to expand but not undergo seismic motion. A deck is supported on the containment structure above the reactor vessel open top by annular bellows, the deck carrying the reactor control rods such that heating of the reactor vessel results in upward expansion against the control rods. (author)

  12. Discussion on the nuclear information resources co-constructing and sharing under network information

    International Nuclear Information System (INIS)

    Wu Yang

    2010-01-01

    During the tenth five-year plan, along with the digitization of information, and the development of information transmission network, the co-construction and sharing of China's nuclear industry information is facing a new development opportunities and challenges. This paper is based on the analysis of the nuclear library status and characteristics, combined of the development process of nuclear information resources over the past 20 years. For the characteristic of information sharing and services in the net environment, the problem in the current co-construction and sharing of nuclear information, and the needs of the future nuclear research and development of nuclear production, this paper forecast the work trends of nuclear information, and gives some countermeasure to strength the development of the co-construction and sharing of nuclear information. (author)

  13. Fostering of Innovative Talents Based on Disciplinary Construction: HRD Strategy of Chinese Nuclear Power Industry

    International Nuclear Information System (INIS)

    Ye Yuanwei

    2014-01-01

    Workforce challenge to nuclear power industry: • We are facing the aging workforce and talent loss since the tough time of nuclear power industry. • Professional workforce fostering in nuclear power industry always needs a long period of time. • Professional workforce fostering in nuclear power industry is a systematic and interdisciplinary work. Talents fostering in nuclear power industry: Major measures → national overall planning; engineering practice; knowledge management; disciplinary construction; cooperation and communication

  14. HSE management for AP1000 nuclear plant construction in EPC mode

    International Nuclear Information System (INIS)

    He Xiaogang; Wei Zhong

    2010-01-01

    As a new nuclear type, AP1000 will become the development direction of Chinese nuclear project. EPC General Contract mode is favored by nuclear owners both at home and abroad. Therefore, there is necessity for studying HSE management system and method suitable for AP1000 nuclear plant construction (ANPC) based on combination of AP1000 construction characters in EPC mode. This can not only ensure safety for ANPC but also positively promote national nuclear power development. For this reason, based on site HSE management of the first AP1000 nuclear plant under construction, HSE management system and method for ANPC in EPC mode was proposed after analysis of the character of EPC mode and ANPC character. It is hoped that it will be helpful for safe construction for ANPC. (authors)

  15. Nuclear Gauges Used in Road Construction | RadTown USA ...

    Science.gov (United States)

    2017-08-07

    Nuclear gauges use radioactive sources to measure the thickness, density or make-up of a wide variety of materials and surfaces. When properly used, nuclear gauges will not expose the public to radiation. Nuclear gauges must be used safely and disposed of properly.

  16. Construction risks of nuclear power plants for use in cost-effectiveness considerations

    International Nuclear Information System (INIS)

    Bock-Werthmann, W.

    1986-08-01

    The construction risk study is concerned with a nuclear power station of 1300 MW(e) design output. The risk figures obtained demonstrate that construction risks of nuclear power plants form a substantial share of the total risk from all steps of the nuclear fuel cycle. When compared with other risk figures it is apparent that only the fatalities caused by the extraction of uranium are of similar magnitude. (55 references). (DG)

  17. Effect of construction time, interest rate, and inflation on the capital cost of nuclear power plants

    International Nuclear Information System (INIS)

    Abel, P.S.; Greybeck, E.M.; Omberg, R.P.

    1981-09-01

    Cost estimates for nuclear power plants currently under construction are on the order of four billion dollars. It will be shown, in this paper, that this is a direct consequence of relatively high inflation rates and relatively long construction times. If either inflation rates or construction times, or a combination thereof, should decrease significantly, cost estimates for nuclear power plants could return to approximately two billion dollars

  18. Nuclear power plants: construction status report, data as of 6/30/82

    International Nuclear Information System (INIS)

    1982-10-01

    This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide information necessary for monitoring progress of all nuclear power plants which have Construction Permits. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  19. Nuclear power plants: construction status report, data as of 03/31/82

    International Nuclear Information System (INIS)

    1982-06-01

    This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide information necessary for monitoring progress of all nuclear power plants which have Construction Permits. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  20. A Study of the potency of construction service industries to support the first nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana

    2008-01-01

    The study was conducted to identify the potency of construction service industries to participate in nuclear power plant program in Indonesia. The potency is identified by evaluation results of national industries potency in some multinational construction service industries. The research methodology chosen was the survey method by sending questionnaires, visits to National industries, interview, and literature study. The data collection technique was sampling purposive. Data can be obtained from both primary and secondary data. The study results showed that the performance of construction service industries to support the NPP program must be increased through the selection of competent human resources, reliable equipment and an effective and efficient project management system, so that they can be expected to play necessary role in the nuclear power plant construction in Indonesia. (author)

  1. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthélemy, Michel; Escobar Rangel, Lina

    2015-01-01

    This paper provides an econometric analysis of nuclear reactor construction costs in France and the United States based on overnight costs data. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using change in expected electricity demand as instrument. We argue that the construction of nuclear reactors can benefit from standardization gains through two channels. First, short term coordination benefits can arise when the diversity of nuclear reactors' designs under construction is low. Second, long term benefits can occur due to learning spillovers from past constructions of similar reactors. We find that construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect–Engineer. In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. -- Highlights: •This paper analyses the determinants of nuclear reactors construction costs and lead-time. •We study short term (coordination gains) and long term (learning by doing) benefits of standardization in France and the US. •Results show that standardization of nuclear programs is a key factor for reducing construction costs. •We also suggest that technological progress has contributed to construction costs escalation

  2. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthelemy, Michel; Escobar Rangel, Lina

    2013-01-01

    This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer (A- E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. (authors)

  3. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  4. Analysis of floor technology scheme in open-top construction of nuclear power project

    International Nuclear Information System (INIS)

    Zhang Shuxia; Lu Qinwu; Han Xiaoping

    2014-01-01

    Open-top construction is general technology in Ⅲ generation in nuclear power project. Because traditional floor structure and its form board upholding doesn't meet open-top construction, four floor scheme are presented, whose characters, advantages and disadvantages, and its application are summarized. The research results will help to the application of open-top construction. (authors)

  5. Purchasing management experience of Haiyang nuclear power project construction period

    International Nuclear Information System (INIS)

    Ma Yuqin

    2013-01-01

    Purchasing is one of the important aspects to ensure the safety and quality of the nuclear power plant. This paper, combining the purchasing peculiarity and purchasing process of Haiyang nuclear power project, summarizes experiences of Haiyang nuclear power project in promoting its purchasing management level in aspects of purchasing method choosing, purchasing plan management, purchasing process optimization, purchasing contract implementation and purchasing surveillance, etc. (author)

  6. BR3/Vulcain Nuclear Power Station. Construction and Operational Experience

    Energy Technology Data Exchange (ETDEWEB)

    Storrer, J. [Belgonucleaire, S.A., Brussels (Belgium)

    1968-04-15

    A full-scale reactor experiment was set out as the main objective of the Vulcain research and development programme agreed in May 1962 between the UKAEA and BelgoNucleaire, manager of ''Syndicat Vulcain''. Vulcain uses variable moderation as the long-term method to control reactivity: the reactor is cooled and moderated by a mixture of heavy and light water, the D{sub 2}O content being stepwise reduced to permit power operation with all control rods completely out of the core. To carry out the Vulcain power experiment it was decided to modify the BR3 nuclear power plant located at Mol, Belgium, which had operated from 1962 to 1964 as a conventional PWR with outputs of 40.9 MW(th) and 11.45 MW(e). The BR3/Vulcain plant was started in December 1966 and since then is running with a load factor around 90%. It is the first time that such a reactor type has been built and operated and the experience gained by its design, construction, commissioning and operation has proven to be most valuable. D{sub 2}O is being used at a pressure (2000 lb/in{sup 2} abs.) never before achieved in a heavy-water reactor and the leak rate from the HP primary systems to the atmosphere has been kept to a negligible value, around 1 to 2 grams/h. Commissioning of the primary plant had been carried out with light water first without fuel, and thereafter with fuel, at which time the water was poisoned with boric acid. The reactor vessel contains experimental devices such as 65 in-pile instrumentation detectors and four hydraulically operated Zircaloy control rods. They required the interposition of a collar between the vessel and its lid. Refuelling is performed under boronated light water, the interchange between the primary water and the H{sub 2}O being carried out by means of a draining and spraying system. The reactor had been operated for two years before its modifications for Vulcain: many lessons have therefore been learned about working on irradiated systems. The BR3/Vulcain core has a

  7. Big five general contractors dominate civil construction market of nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The Japanese construction industry is a key industry accounting for about 20 % of the GNP, and the investment in construction amounted to 51,200 billion yen in fiscal 1984. 515,000 firms employing about 5.5 million workers belong to the industry. 99.4 % of these firms is the enterprises capitalized at less than 100 million yen, and most of them are small self-employment enterprises. The Construction Business Law provides that those who wish to engage in construction are required to obtain a permit from the Construction Ministry or from a local prefectural governor. There are big five and seven sub-major construction companies in Japan. The big five formed the tie-up relations with three nuclear reactor manufacturers. 76 civil engineering and construction companies recorded the sales related to nuclear power in 1983 amounting to 330.9 billion yen, equivalent to 21 % of the total nuclear-related sales. The construction of nuclear power plants and the characteristics of the construction, and the activities of the big five in the field of nuclear industry are reported. (Kako, I.)

  8. Quality control of three main materials for civil construction of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Feng

    2011-01-01

    The construction and operation of nuclear power plant is a systematic engineering. To ensure quality and safety of nuclear power plants, each work from design to operation can have certain impact on the quality and safety of the project. The quality of each related work shall be controlled. Starting from the quality control over raw materials for the civil construction of nuclear power plant, this article mainly analyzes how to control the quality and manage the three main materials of steel, concrete and modular parts in the civil construction. (author)

  9. In nuclear civil construction, France benefits from a leading know-how and expertise

    International Nuclear Information System (INIS)

    Martin, F.

    2016-01-01

    EGIS is an enterprise that has been a partner for EDF and AREVA since the construction of the first nuclear power plant in France at Fessenheim in 1970. EGIS has a global competency for nuclear civil construction from design to the follow-up of the work. EGIS has taken part into the construction of the 3 first EPR in France, Finland and China and into the implementation of post-Fukushima measures in operating nuclear power plants. EGIS has developed a specific know-how for managing the seismic risk. (A.C.)

  10. 'Concrete shell formwork' technology applied to the construction of the Paks Nuclear Power Plant

    International Nuclear Information System (INIS)

    Fejes, A.

    1982-01-01

    The conventional formworking technology could not meet the unusual requirements needed in constructing the concrete walls of the nuclear power plant building. A new concrete shell formworking developed in the Soviet Union has been adapted to meet the criteria. Prefabricated concrete shells are mounted separately during construction on separated parts of the reinforcing structure. The steps of the construction process are described with the economic evaluation of this new construction technology. (R.P.)

  11. Risks and challenges associated with the design and construction of a nuclear power plant

    International Nuclear Information System (INIS)

    Liebana Martinez, B.; Armas Garcia, A.; Martinez Gozalo, I.

    2011-01-01

    The construction of a nuclear power plant project, considering the period prior to the operation of the plant, requires a very strict risk control to ensure compliance with a series of challenges. The present paper identifying the most important challenges facing the construct ability and license requirements of the process, identifying the interfaces and proposing a methodology of construction to meet the challenge of a construction process in 5 years.

  12. The socio-economic impacts on regional areas as a result of new nuclear construction and nuclear decommissioning

    International Nuclear Information System (INIS)

    Devine, J. Michael

    2010-01-01

    Large social and economic impacts are caused by new nuclear construction and eventual shutdown of operations and decommissioning. When new construction begins, the impact on the local area is enormous. The influx of construction workers and businesses to provide services and goods usually overwhelms the area which previously may have had a minimal amount of infrastructure and little population. Also, given that many of the current nuclear facilities worldwide are located in somewhat remote regions, they have become the primary source of jobs for those regions. When these facilities shut down and go into decommissioning, there can be several adverse effects upon the region or area. This paper will address some of the primary socio-economic influences of both new nuclear construction and subsequent decommissioning. (author)

  13. Introduction of construction management system for preparation work of Shimane Nuclear Power Station Unit-3

    International Nuclear Information System (INIS)

    Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji

    2005-01-01

    The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)

  14. Improvements in the construction of nuclear power plant

    International Nuclear Information System (INIS)

    1990-01-01

    This paper outlines activities to minimize the amount of work at a construction site by employing installation method with large size blocks and shop-assembled units, improvement in facilities such as mechanization of welding and huge roof cover which enables work in all weather conditions, and administration systems using computer for the work activity control as well as quality and progress control for construction work. These improvements are only achieved when supported by related system improvements at the design and fabrication stage, and these improvements contributed a great deal to the quality assurance and the shorter construction period. (author)

  15. 2008 annual meeting on nuclear technology: topical sessions. Pt. 2. Construction of the final repository KONRAD

    International Nuclear Information System (INIS)

    Broeskamp, H.

    2008-01-01

    Summary report by Dipl.-Ing. Holger Broeskamp on the Topical Session ''Constructing the Final Repository KONRAD'' of the Annual Conference on Nuclear Technology held in Hamburg, May 27-29, 2008. (orig.)

  16. A majority in favour of the construction of further nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The results of an opinion poll of 5000 German-speaking persons in Bern Canton, Switzerland are summarised and commented on. 54% of those questioned expressed approval of further nuclear power station construction in Switzerland. (F.Q.)

  17. The Brazilian experience in the civil construction of nuclear power plants

    International Nuclear Information System (INIS)

    Gonzaga, L.A.

    1985-01-01

    The processes and phases of technology absorption, together with the resultant Experience Factor Model for Civil Works, considering philosophy of operation of the civil contractor, design aspects and some structural influences for constructing nuclear power plants are presented. (author) [pt

  18. Construction and commissioning experience of evolutionary water cooled nuclear power plants

    International Nuclear Information System (INIS)

    2004-04-01

    Electricity market liberalization is an established fact in several countries and there is a trend to adopt it in other countries. The essential aim of market liberalization is to improve the overall economic efficiency. In order that nuclear power remains a viable option for electricity generation, its costs should be competitive with alternative sources while, at the same time, it should have a safe and reliable operation record. The capital cost of nuclear power plants (NPPs) generally accounts for 43-70% of the total nuclear electricity generation costs, compared to 26-48% for coal plants and 13-32% for gas plants. Most of these expenditures are incurred during the construction phase of a NPP. The achievement of shorter construction periods using improved technology and construction methods has a significant benefit on the costs incurred prior to any production of electricity. This document is intended to make the recent worldwide experience on construction and commissioning of evolutionary water cooled NPPs available to Member States and especially to those with nuclear power plants under construction/planning, and to those seriously considering nuclear power projects in the future. The final aim is to assist utilities and other organizations in Member States to improve the construction of nuclear power plants and achieve shortened schedules and reduced costs without compromising quality and safety. This document aims to provide an overview of the most advanced technologies, methods and processes used in construction and commissioning of recent nuclear projects. To better achieve this objective the presentation is selectively focused more on the new developments rather than providing a full review of all issues related to construction and commissioning. The experience described in this TECDOC applies to managers, engineers, supervisors, technicians and workers in various organizations dealing with the site construction and commissioning of nuclear power plants

  19. Method for the construction of a nuclear reactor with a prestressed concrete pressure vessel

    International Nuclear Information System (INIS)

    Schoening, J.; Schwiers, H.G.

    1981-01-01

    Method for the construction of nuclear reactors with prestressed concrete pressure vessel, providing during the initial stage of construction of the prestressed concrete pressure vessel a support structure around the liner. This enables an early mounting of core components in clean conditions as well as load reductions for final concreting in layers of the prestressed concrete pressure vessel. By applying the support structure, the overall assembly time of these nuclear power plant is considerably reduced without extra cost. (orig.) [de

  20. Measurements of nuclear data and possibility to construct the nuclear data production facility based on electron linac

    Energy Technology Data Exchange (ETDEWEB)

    Namkung, Won; Ko, In Soo; Cho, Moo Hyun; Kim, Gui Nyun; Lee, Young Seok; Kang, Heung Sik [Pohang University of Science and Technology, Pohang(Korea)

    2001-04-01

    In order to construct an infrastructure to produce nuclear data, we studied three main items; (1) Study on the possibility to construct a facility for nuclear data production, (2) Production of nuclear data for nuclear power plant, and (3) Pulsed neutron source based on a 100-MeV electron linac at Pohang Accelerator Laboratory (PAL). We confirmed the possibility to build a nuclear data production facility utilizing a 100-MeV electron linac at PAL and manpower who wanted to participate the nuclear data production experiments. In order to measure the nuclear data for nuclear power plant, we used several nuclear data production facilities in abroad. We measured total cross sections and neutron caprure cross sections for {sup nat}Dy and {sup nat}Hf using the pulsed neutron facility in the Research Reactor Institute, Kyoto University (KURRI). The neutron capture cross sections for {sup 161,162,163,164}Dy were measured at KURRI in the neutron energy region between 0.001 eV and several tens keV, and at the fast neutron facility in Tokyo Institute of Technology in the neutron energy region between 10 keV and 100 keV. We also measured the neutron capture cross sections and gamma multiplicity of {sup 232}Th at the IBR30 in Dubna, Russia. We have construct a pulsed neutron source using a 100-MeV electron linac at PAL. We measured neutron time-of-flight (TOF) spectra in order to check the characteristics of the pulsed neutron source. We also measured a neutron total cross sections of W and Cu. The pulsed neutron facility can be utilized in the education facility for nuclear data production and the test facility for the R and D purpose of the nuclear data production facility. 29 refs., 57 figs., 22 tabs. (Author)

  1. The research on the material management system in nuclear power plant construction process

    International Nuclear Information System (INIS)

    Liu Xuegeng; Huang Zhongping

    2010-01-01

    According to the module construction speciality of nuclear power plant, this article analyzes the relationship between the actual amount of the material transported to the construction site and the planed needs of the material, and points out the zero inventory management target in the nuclear power plant construction site. Based on this, the article put forward a nuclear power plant material management system which is based on the 'pull' information driver. This system is composed by material coding sub-system, procurement and site material integrated management sub-system and project control sub-system, and is driven by the material demand from construction site to realize the JIT purchasing. This structure of the system can reduce the gap between the actual amount of the material transported to the site and the planed needs of the material and achieve the target of reducing storage at construction site. (authors)

  2. Construction of a bibliographic information database for the nuclear engineering

    International Nuclear Information System (INIS)

    Kim, Tae Whan; Lim, Yeon Soo; Kwac, Dong Chul

    1991-12-01

    The major goal of the project is to develop a nuclear science database of materials that have been published in Korea and to establish a network system that will give relevant information to people in the nuclear industry by linking this system with the proposed National Science Technical Information Network. This project aims to establish a database consisted of about 1,000 research reports that were prepared by KAERI from 1979 to 1990. The contents of the project are as follows: 1. Materials Selection and Collection 2. Index and Abstract Preparation 3. Data Input and Transmission. This project is intended to achieve the goal of maximum utilization of nuclear information in Korea. (Author)

  3. Important statistics on engineering and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Budwani, R.N.

    1976-01-01

    During the past seven years, a study was made of the engineering and craft manpower/manhour requirements, craft breakdowns by totals and peaks, material requirements, unit man-hours, rate of manhour/capital expenditures, and schedule requirements of representative nuclear power plants across the United States. The study is based on information received from electric utilities, engineer-constructors, site visits, the Nuclear Regulatory Commission (NRC), personal contacts, and the exchange of information with knowledgeable people. Preliminary data in the form of tables and figures are presented. Factors which have and will influence manpower, manhours, material requirements, building volumes, and schedules are outlined, and a list of recommendations is presented. The objective of this study has been to show in a concise fashion what the trend has been and what may be anticipated for future nuclear power plants

  4. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  5. Supply chain of steel industries for the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sahala M Lumbanraja

    2017-01-01

    Nuclear Power Plant (NPP) Construction needs steel materials for the manufacturing of heavy components and civil work construction. National industries is expected to supply steel components especially for non nuclear component needs. Supply chain of steel industries is required to know the potency of steel industries from upstream to downstream industries which can support the NPP construction sustainability. The type of steel needed in the NPP construction consist of structure steel, rebar, steel plate, etc. The aim of the study is to identify supply chain of steel industries from upstream industries to downstream industries so that they can supply steel needs in the NPP construction. The methodology used are literature review and industries survey by purposive sampling test which sent questionnaires and carrying out technical visits to the potential industries to supply steel components for NPP construction. From the analysis of the questionnaires and survey, it has been obtained that the Indonesian steel industries capable of supplying steel for construction materials of non-nuclear parts are PT. Krakatau Steel, PT. Gunung Steel Group (PT Gunung Garuda and PT. Gunung Raja Paksi), PT. Cilegon Fabricators and PT. Ometraco Arya Samanta. While steel materials for primary components with nuclear grade, such as steel materials for reactor vessels and pressure vessels, the Indonesian steel industry has not been able to supply them. Therefore, the Indonesian steel industries must improve its capability, both in raw material processing and fabrication capability in order to meet the requirements of specifications, codes and standards of nuclear grade. (author)

  6. Study of the influencies of Angra-1 nuclear power plant construction in Angra dos Reis

    International Nuclear Information System (INIS)

    Ferreira Netto, L.

    1982-01-01

    The report presents a comprehensive evaluation of the influence caused by Angra-1 Nuclear Power Plants (Central Nuclear Almirante Alvaro Alberto) construction on the Angra dos Reis City - Rio de Janeiro - Brazil. The analysis performed adopts a multi-dimensional methodology with four analysis dimensions: political-institutional, physical-territorial, social-economic and temporal. (author)

  7. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  8. Abstract of articles presented at the seminar of investigating the construction of nuclear power plant in Iran

    International Nuclear Information System (INIS)

    Hariri, A.; Khonsari Moosavi, R.; Shoai-Naini, J.; Motamedi, M.A.

    1982-01-01

    Under five subtitles papers had been presented to the seminar of investigating the construction of nuclear power plant held at Isfahan by Atomic Energy Organization of Iran (AEOI). 1.The necessity of constructing nuclear power plants in Iran with relation to the development of nuclear technology. 2.Seven articles survey the problem of fuel cycling and the potentiallity of AEOI in this field. 3. Four papers allocate to the technology of nuclear safety and radiation protection. 4.Three papers evaluate technical and scientific capabitities of AEOI for constructing nuclear power plants, and two paper about planning and training man power with an aim toward construction of nuclear power plants

  9. Impact of ACI-ASME code on design and construction of nuclear containment structures

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1978-01-01

    The effect of the ACI-ASME code for design and construction of concrete containment structures on the nuclear and concrete industries is examined. Topics covered include purpose of the code, general requirements, responsibilities and duties, design and construction specifications, quality assurance, inspection, the liner, and stamping

  10. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    International Nuclear Information System (INIS)

    Kim, Woojoong; Ryu, Dongsoo; Jung, Youngsoo

    2014-01-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation

  11. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woojoong, E-mail: minidung@nate.com [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Ryu, Dongsoo, E-mail: energyboy@khnp.co.kr [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Jung, Youngsoo, E-mail: yjung97@mju.ac.kr [College of Architecture, Myongji University, Yongin 449-728 (Korea, Republic of)

    2014-04-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation.

  12. WIPP: construction and progress on a successful nuclear waste repository

    International Nuclear Information System (INIS)

    Cooper, W.R.; Sankey, C.A.

    1985-01-01

    The Department of Energy is constructing the Waste Isolation Pilot Plant (WIPP) in Southeastern New Mexico. The facility will retrievably store transuranic waste from defense activities of the United States and conduct experiments with Defense high-level waste which will be retrieved at the end of the experiments. This paper describes the progress and the present status of activities at WIPP. 4 refs

  13. Construction of a bibliographic information database and a web directory for the nuclear science and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jeong Hoon; Kim, Tae Whan; Lee, Ji Ho; Chun, Young Chun; Yu, An Na

    2005-11-15

    The objective of this project is to construct the bibliographic information database and the web directory in the nuclear field. Its construction is very timely and important. Because nuclear science and technology has an considerable effect all over the other sciences and technologies due to its property of giant and complex engineering. We aimed to firmly build up a basis of efficient management of the bibliographic information database and the web directory in the nuclear field. The results of this project that we achieved in this year are as follows : first, construction of the bibliographic information database in the nuclear field(the target title: 1,500 titles ; research report: 1,000 titles, full-text report: 250 titles, full-text article: 250 titles). Second, completion of construction of the web directory in the nuclear field by using SWING (the total figure achieved : 2,613 titles). We plan that we will positively give more information to the general public interested in the nuclear field and to the experts of the field through this bibliographic information database on KAERI's home page, KAERI's electronic library and other related sites as well as participation at various seminars and meetings related to the nuclear field.

  14. Nuclear power plants in Europe 1995. Report about operation, construction, and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Report about Operation, Construction, and Planning in 18 European Countries Eighteen European countries operate and build, respectively, nuclear power plants in 1995. The ''Nuclear Power Plants in Europe 1995'' atw report singles out the main events and lines of development. As per August 1995, 214 (1994: 215) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 177,010 (176,322) MWe installed gross capacity are in operation in seventeen countries, and 26 (30) units with 24,786 (28,086) MWe are under construction in seven countries. This adds up to a total of 240 (245) nuclear generating units with an aggregate 201,796 (204,408) MWe. In the nuclear power plants in Europe, some 1048 TWh of nuclear power was converted into electric power in 1994; 792 TWh of this aggregate was converted in 137 units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 36%. Lithuania, with 77%, has the highest share of nuclear power in Europe, followed by France with 75% and Belgium with 56%. The lowest percentage, only 5%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power plants are operated, such as Italy or Austria. (orig.) [de

  15. A reply to “Historical construction costs of global nuclear power reactors”

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.; Grubler, Arnulf

    2017-01-01

    present data on the overnight costs of more than half of nuclear reactors built worldwide since the beginning of the nuclear age. The authors claim that this consolidated data set offers more accurate insights than previous country-level assessments. Unfortunately, the authors make analytical choices that mask nuclear power's real construction costs, cherry pick data, and include misleading data on early experimental and demonstration reactors. For those reasons, serious students of such issues should look elsewhere for guidance about understanding the true costs of nuclear power. - Highlights: • claim to accurately assess nuclear plant costs over time. • The authors err by relying on overnight costs, which exclude interest. • The authors cherry pick data (e.g, ignoring problems with French nuclear data). • The article's cherry picked data don’t even support the article's own conclusions. • Lovering et al. is not a reliable source for costs of nuclear power.

  16. Project assessment for construction of new nuclear facility

    International Nuclear Information System (INIS)

    2013-01-01

    Project risk management is an important and integral part of project and quality management. It is also a key part of the due diligence process in making informed project decisions where in addition to the qualitative assessments quantitative ones shall be used to the extend practical. As part of the risk management process, risk identification, evaluation and mitigation must be an on-going activity at senior management levels throughout the planning, design, construction and commissioning phases of a new NPP

  17. A nuclear power enterprise debt management system construction Based on Sanmen Nuclear Power Co., LTD, debt risk management case analysis

    International Nuclear Information System (INIS)

    Wu Yan; Liu Shuqing

    2010-01-01

    Building nuclear power enterprises need huge investment , often tens of billions RMB. How to do a good job in corporate debt risk management, becoming powerful large-scale development of nuclear power ,ensuring the supply of funds and existing debt service in the process of large-scale development of nuclear power ,is an important task. In this paper, managing the company's debt is very urgent and necessary through analysis of SMNPC financing and debt structure; through the analysis of SMNPC's debt risk management , the authors would like to explore how to build up the framework of the debt management under the large-scale development of nuclear power construction . Nuclear power enterprises need to strengthen supervision mechanism and internal control,build-up and perfect all-round debt risk manage system, keep watch on debt risk in order to ensure preservation and increment of the value of state assets. (authors)

  18. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  19. Consideration of the legal system required for achievement of current nuclear power plant construction programmes

    International Nuclear Information System (INIS)

    Castellon Fernandez, E.; Forum Atomico Espanol, Madrid)

    1976-01-01

    The extensive nuclear power plant construction programmes currently in progress in western countries require updating of the legislation in force in this field, especially as regards the following: acquisition of the sites necessary by means of a national planning programme of available sites; simplification of formalities concerning issuance of administrative licenses; revision of the principle of absolute and exclusive liability of the nuclear operator which forms the basis of the third party liability system for nuclear damage; radioactive waste management and decommissioning of nuclear plants. Furthermore, this new legislation should be harmonized between the different countries concerned. (N.E.A.) [fr

  20. Nuclear Power Plant Construction Contracts: A Review of the Major Problems

    International Nuclear Information System (INIS)

    Crawford, B.B.

    1977-01-01

    This paper analyses the problems raised by nuclear power plant construction contracts. To the extent these contracts can be defined as devices for allocating responsibilities and risks between the Contracting Parties, the author notes that the 'responsibilities' aspect presents no problem peculiar to the nuclear sector and that difficulties mainly stem from co-ordination of work. On the other hand, the list of problems linked to 'nuclear contract risks' is long: uncertainties in the licensing procedure and export licenses, changes in pricing due to inflation, imprevision and force majeure theories, protection of proprietary information, operator's civil liability for nuclear incidents. (NEA) [fr

  1. Liquid metal cooled fast breeder nuclear reactor constructions

    International Nuclear Information System (INIS)

    Chesworth, G.; Hind, J.R.; Hodgson, D.; Seed, G.

    1981-01-01

    In a nuclear reactor of the pool kind the primary vessel and fuel assembly are carried from the roof of the containment vault by tie straps. The primary vessel incorporates an annular yoke of 'k' cross-section the tie straps being attached to the upwardly directed vertical leg and the downwardly directed inclined leg. The upper and lower strakes of the primary vessel are extensions of the remaining legs. Load supporting welds therefore are of intermittent nature thereby limiting the effects of weld crack propagation

  2. Stainless steel pool constructing technology and management of Fangjiashan Nuclear Power Company

    International Nuclear Information System (INIS)

    Wei Lianfeng; Wang Qun

    2013-01-01

    The construction of Fangjiashan nuclear power plant stainless steel cladding has been taken much attention. Based on the careful analysis of stainless steel cladding welding and construction main issues; Many measures have been taken such as welding technology, construction process, the stress control of welding deformation, the cleanliness control of construction process, install precision control, improvements of Non-destructive testing, product protection, etc. And installation methods and techniques have been improved and innovative, the installation quality of stainless steel cladding has been enhanced. At the same time, as owners of the plants, we explored the methods of quality supervision and control, together with the relevant units; and sense of quality management has been unified effectively, made stainless steel cladding quality getting better and better. Fangjiashan nuclear power stainless steel cladding construction quality and management experience has been highly recognized by every company. (authors)

  3. Augmented reality for improved communication of construction and maintenance plans in nuclear power plants

    International Nuclear Information System (INIS)

    Sorensen, Soren S.

    2010-01-01

    The purpose of implementing Augmented Reality, AR, in the planning, construction and maintenance of Nuclear Power Plants is to secure strict control, precise and correct constructions, exact execution of assignments and heightened safety at all levels. Communication of construction plans to ensure precise and correct assembly of structural elements is essential in all building projects. This is especially crucial in the construction of nuclear plants and installation of new components. The current ways in which construction plans are communicated, blueprints, 3D digital models and written descriptions all embody the need for significant levels of abstraction and interpretation, and are thus both difficult to understand and can lead to misinterpretations. A simulation system with full scale three dimensional models experienced in the physical setting where operations are to take place would bring operators closer to the real life assignments. Augmented Reality is a visualization technology that provides this motivation. (author)

  4. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  5. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  6. The quality control for biological-shield heavy concrete construction of nuclear power project

    International Nuclear Information System (INIS)

    Sun Hongjun; Ma Xinchao

    2012-01-01

    The paper introduces the function and characteristics of biological protective heavy-concrete, and its main application scope and role in Fangjiashan nuclear power project. From the aspects of raw material selection, mixing ratio test, heavy concrete production, the paper discusses the main control points of heavy concrete construction process, points out the basic characteristics of heavy concrete construction, and put forward measures to prevent density non-uniformity during heavy concrete construction and to control slump during transportation. Results prove that reasonable construction process control can assure the engineering quality. (authors)

  7. Improvement of QA/QC activities in the construction of nuclear power plant

    International Nuclear Information System (INIS)

    Jinji Tomita; Shigetaka Tomaru

    1987-01-01

    Construction of commercial nuclear power plants in Japan started at around 1965. In this presentation are described quality assurance (QA) activities of a plant supplier who is a manufacturer of the key components as well. The QA activities until now are divided into several periods of the construction history in Japan. First term is 1960's when the QA activities are featured as the study and implementation through the construction of imported plants. Since then technologies and procedures of our own have been established and improved for the construction of high reliability plants. Our present QA activities are based on the active reflection of those lessons learned of past experiences. (author)

  8. Nuclear power plants. Construction status report, data as of September 30, 1977

    International Nuclear Information System (INIS)

    1977-10-01

    The report provides information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. T he status of 93 plants authorized to engage in construction activities is summarized. This total includes (4) plants with construction exemptions, and (11) plants with Limited Work Authorization Permits

  9. Nuclear power plants. Construction status report, data as of June 30, 1977. Data for decisions

    International Nuclear Information System (INIS)

    1977-07-01

    The report is designed to provide the necessary information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of the 92 plants authorized to engage in construction activities is summarized. This total includes 4 plants with construction exemptions, and 18 plants with Limited Work Authorization Permits

  10. A regulatory perspective of the role of construction in revitalizing the United States nuclear industry

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1983-01-01

    Technical and managerial experience in nuclear power plant construction is presented from the perspective of the United States Nuclear Regulatory Commission (NRC). In the context of actions that would contribute to revitalizing the nuclear industry in the United States of America, greater effectiveness of utility management during construction is proposed. The reasons why management effectiveness is so important are developed beginning with summaries of defects that were built into several US plants under construction. The root causes of these significant defects were management failures. In terms of benefits, effective management is important because of its effects on nuclear safety, project construction costs, and future reliability of the plant after commissioning. Actions that would enhance good management include emphasizing the inseparable nature of production and quality, that quality cannot be inspected into a plant, and that a strong construction management staff and exchanges of experience and information are essential. Techniques that have been used successfully in construction management are discussed. NRC and industry initiatives are in progress to improve management responsibility and learning from experience. Projects include Owner's Certification, assessments of licensee performance, fostering good practices across the industry, and improving the NRC inspection programme. Revitalization will not be easy, but it is achievable. (author)

  11. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Pingish, Panupong [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  12. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Pingish, Panupong; Choi, Kwang Sik

    2010-01-01

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  13. Assessment of modular construction for safety-related structures at advanced nuclear power plants

    International Nuclear Information System (INIS)

    Braverman, J.; Morante, R.; Hofmayer, C.

    1997-03-01

    Modular construction techniques have been successfully used in a number of industries, both domestically and internationally. Recently, the use of structural modules has been proposed for advanced nuclear power plants. The objective in utilizing modular construction is to reduce the construction schedule, reduce construction costs, and improve the quality of construction. This report documents the results of a program which evaluated the proposed use of modular construction for safety-related structures in advanced nuclear power plant designs. The program included review of current modular construction technology, development of licensing review criteria for modular construction, and initial validation of currently available analytical techniques applied to concrete-filled steel structural modules. The program was conducted in three phases. The objective of the first phase was to identify the technical issues and the need for further study in order to support NRC licensing review activities. The two key findings were the need for supplementary review criteria to augment the Standard Review Plan and the need for verified design/analysis methodology for unique types of modules, such as the concrete-filled steel module. In the second phase of this program, Modular Construction Review Criteria were developed to provide guidance for licensing reviews. In the third phase, an analysis effort was conducted to determine if currently available finite element analysis techniques can be used to predict the response of concrete-filled steel modules

  14. Modular construction of nuclear power plants in Korea and technical issues - 15051

    International Nuclear Information System (INIS)

    Kim, T.I.; Kim, K.K.; Yoon, J.J.; Han, G.E.

    2015-01-01

    The construction of nuclear power plants (NPPs) is the process of installing structures, systems and components (SCCs) of NPPs within a targeted time and a budget while ensuring quality and safety. Recently various efforts have been made in the nuclear industry to construct NPPs more effectively and modular construction has been highlighted as one of the most effective methods. Modular construction has been known to be effective in reducing construction time, allocating labor and equipment more efficiently while ensuring quality. The installation of structures and systems requires stable provision of labor force which is essential to keep the installation work of bulk materials such as re-bars, pipes and so forth in a construction site over a long period. Especially, in the case of the structure work, it is greatly affected by weather conditions such as rainfall, snow and wind, and discontinuity of installation work due to weather is directly related with success of a construction project. The most significant feature of modular construction is that SSCs could be pre-fabricated at an off-site factory or an assembly shop near a construction site, which provides stable labor force and favorable work condition impervious to weather. Reinforced concrete is largely used in NPPs and re-bar and form works are time consuming requiring lots of labor force at a construction site. Various efforts have been made to install re-bars and forms at the same time, which led to the development of SC structures. SC structures are composed of face steel plates which work as forms for concrete pouring as well as reinforcement for concrete. In this paper, we are going to introduce module types applicable to construction of NPPs and the status of modular construction in Korea. In addition, several issues will be addressed for the successful application of modular construction

  15. Quality assurance and quality control of nuclear engineering during construction phase

    International Nuclear Information System (INIS)

    Zhang Zhihua; Deng Yue; Liu Yaoguang; Xu Xianqi; Zhou Shan; Qian Dazhi; Zhang Yang

    2007-01-01

    The quality assurance (QA) and quality control (QC) is a very important work in the nuclear engineering. This paper starts with how to establish quality assurance system of nuclear engineering construction phase, then introduces several experiments and techniques such as the implementation of quality assurance program, the quality assurance and quality control of contractors, the quality surveillance and control of supervisory companies, quality assurance audit and surveillance of builders. (authors)

  16. Nuclear power plants in Europe 1996. Report on operation, construction and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Eighteen European countries operate and build, respectively, nuclear power plants in 1996. The 'Nuclear Power Plants in Europe 1996' atw report singles out the main events and lines of development. As per August 1996, 216 (1995: 215) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 177,916 (177,010) MWe installed gross capacity are in operation and 24 (26) units with 23,086 (24,786) MWe are under construction in seven countries. This adds up to a total of 240 (241) nuclear generating units with an aggregate 201,002 (201,796) MWe. In the nuclear power plants in Europe, some 1067 (1048) TWh of nuclear power was converted into electric power in 1995; 802 (792) TWh of this aggregate was converted in 142 (137) units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 36%. Lithuania, with 86 (77)% has the highest share of nuclear power in Europe, followed by France with 76 (75)% and Belgium with 56%. The lowest percentage, only 4 (5)%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power are operated, such as Italy or Austria. (orig.) [de

  17. 1997: Nuclear power plants in Europe. Report on operation, construction and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Eighteen European countries operate and build, respectively, nuclear power plants in 1997. The '1997: Nuclear Power Plants in Europe' atw report singles out the main events and lines of development. As per August 1997, 216 (1996: 216) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 180, 184 (177, 916) MWe installed gross capacity are in operation and 22 (24) units with 20,054 (23,086) MWe are under construction in seven countries. This adds up to a total of 238 (240) nuclear generating units with an aggregate 200,238 (201,002) MWe. In the nuclear power plants in Europe, some 1138 (1067) TWh of nuclear power was converted into electric power in 1996: 806 (802) TWh of this aggregate was converted in 142 (142) units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 35,4 (36,0)%. Lithuania, with 83,4 (85,6)% has the highest share of nuclear power in Europe, followed by France with 77,4 (76,0)% and Belgium with 57,2 (55,5)%. The lowest percentage, only 4,8 (3,8)%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power is operated, such as Italy or Austria. (orig.) [de

  18. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  19. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Vaugh Whisker

    2004-02-28

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project.

  20. Business data processing in the service of quality and safety in nuclear power plant construction

    International Nuclear Information System (INIS)

    Chassignet, C.

    1980-01-01

    Construction of a nuclear power plant implies collection and correlation of several thousand items of information which must be identified and which must remain retrievable throughout the service life of the plant. The Framatome Corporation, which has one of the largest nuclear power plant construction programs in the world, therefore set up a processing and checking system for the documents containing this information. The author describes the functions and principles of this system (known as SHARAD), together with its technical data and its operation [fr

  1. Quality assurance in the construction phase of the Guangdong Daya Bay Nuclear Power Plant

    International Nuclear Information System (INIS)

    Chen Heling; Zou Xiaoshun

    1994-11-01

    The quality assurance system of Guangdong Daya Bay Nuclear Power Plant during construction phase is briefly introduced. It includes the quality assurance organization and multiple quality control system of the owner (GNPJVC) and contractors. The status of the programmes implementation has been also described through presenting of some important quality assurance activities such as quality surveillance, QA audit and nonconformance control. In addition, the effectiveness of GNPP Construction QA Program has been analyzed and evaluated and both positive and negative experience have been summarized which could be used for reference by the nuclear power constructors. (6 figs.)

  2. Needs for Constructing and Possibilities of Nuclear Power Plants Interconnection to the Croatian Electricity Grid

    International Nuclear Information System (INIS)

    Zeljko, M.; Bajs, D.

    1998-01-01

    Due to development of electric power system and considering an increase of electrical energy consumption, needs for larger units in new power plants are obvious. Connection of large nuclear power plants to the grid, depending on their power and location, usually requires significant investments in transmission network development and construction. Considering the capacity of the 400 kV transmission network in Croatia, this problem is evident. This paper deals with the possibilities of nuclear power plants construction, as one possible option in electric power system development, and their interconnection to the electricity grid. (author)

  3. Improvement of design and construction technology in Japanese nuclear power plants

    International Nuclear Information System (INIS)

    Yomei Kato; Kiyoshi Shmizu

    1987-01-01

    Nuclear power generation currently offers economic merits superior to those of other methods dependant on such thermal power ganeration as petroleum, LNG, or coal. However, it is essential for the nuclear power generation continuously to retain economic superiority through concurently maintaining its high safety features and outstanding reliability. For achieving this purpose, taking into account of importance explained above, we have been developing and improving those of technologies such as design, engineering, and construction regarding the both field of management and techniques useful for plant construction. This paper covers the several instructive matters which Hitachi has accomplished throughout having had his hand in the project jobs. (author)

  4. Will nuclear power plant standardization reduce the licensing impact on construction

    International Nuclear Information System (INIS)

    Allen, J.M.; Bingham, W.G.; Keith, D.G.

    1976-01-01

    The NRC and the nuclear industry have been pursuing standardization quite vigorously in an effort to reduce the cost and schedule for the design and construction of nuclear power plants. The NRC is currently reviewing standard plant applications submitted under each of four standardization options. In addition, the NRC has published Standard Review Plans and Standard Technical Specifications. Although problems exist in the implementation of standardization and in areas unaffected by standardization, each of these standardization methods has the potential to reduce the licensing impact on construction

  5. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    International Nuclear Information System (INIS)

    Timothy Shaw; Vaugh Whisker

    2004-01-01

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project

  6. Quality assurance in the construction phase of the Guangdong Daya Bay Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Heling, Chen; Xiaoshun, Zou [Guangdong Nuclear Power Joint Venture Company (China)

    1994-11-01

    The quality assurance system of Guangdong Daya Bay Nuclear Power Plant during construction phase is briefly introduced. It includes the quality assurance organization and multiple quality control system of the owner (GNPJVC) and contractors. The status of the programmes implementation has been also described through presenting of some important quality assurance activities such as quality surveillance, QA audit and nonconformance control. In addition, the effectiveness of GNPP Construction QA Program has been analyzed and evaluated and both positive and negative experience have been summarized which could be used for reference by the nuclear power constructors. (6 figs.).

  7. Stages in planning and construction of the Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Pracht, F.

    1975-01-01

    On October 23, 1972, RWE gave a letter of intent and on January 9, 1973 an order for the construction of a nuclear power plant on a turn-key basis to the consortium of BBC, BBR and Hochtief. The power plant in question was the Muelheim-Kaerlich nuclear power station with a pressurized-water reactor of a gross efficiency of 1,295 MWe. After considerable delay of the project, the first building permit was issued to the builder-owner on January 15, 1975, and the constructional work on the building site started immediately afterwards. As the planning and constructional work has so far been carried out according to schedule and the consortium intends to keep the effects of the belated license as small as possible, the start-off of the plant will probably be in summer 1979 if the constructional work is not interrupted. (orig./AK) [de

  8. Analysis of the financial task generated by the construction of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Alonso, G.; Ramirez, R.; Palacios, J.; Delfin, A.

    2011-11-01

    The construction of new nuclear reactors requires of a high investment making them intensive projects in capital and that require as minimum of 5 years for its construction. The financial task that represents for the electric company is of vital importance, since in the case of privates in other countries prevents them of entering in this type of projects if they do not have its Government support. In the case of Mexico, being an electric company integrated vertically can have financing to carry out this investment type. In this study is analyzed the construction viability of new nuclear reactors in Mexico based on the financial task that represents for the Electric Company its construction. (Author)

  9. Outline of construction and facility features of Onagawa nuclear power station Unit No. 2

    International Nuclear Information System (INIS)

    Umimura, Yoshiharu; Tsunoda, Ryohei; Watanabe, Kazunori

    1996-01-01

    Tohoku Electric Power Company promotes development of various power sources to provide a stable supply of electricity in the future, and nuclear power takes a leading part. In August 1989, construction of Onagawa nuclear power plant Unit No. 2 (825MW) was started, following Unit No. 1 (524MW) which went on line in 1984 as Tohoku Electric's first nuclear power plant unit. Unit No. 2 began commercial operation in July 1995 through satisfactory construction work such as RPV hydraulic test in March 1994, fuel loading in October 1994, and various startup tests in each power stage. The design and construction of Unit No. 2 reflect construction and operation experience gained from Unit No. 1, and the latest technology, including that of the LWR Improvement and Standardization Program, was adopted to enhance facility reliability, improve operation and maintenance performance, and reduce worker dosage. Features of the facility, construction techniques, and a description of preoperation of Onagawa nuclear power plant Unit No. 2 are described in this paper. (author)

  10. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant...

  11. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  12. Socio-demographic and economic aspects of nuclear power plant construction and operation

    International Nuclear Information System (INIS)

    1984-01-01

    The proceedings contain 10 papers of which 9 have been inputted in INIS. The papers deal with the economic, social and ecological consequences of the construction of nuclear power plants. Various approaches are listed to the economic evaluation of the said consequences. The question is discussed of the efficiency of investments for the construction of nucliear power plants as are the probiems of sitting large projects. (E.S.)

  13. Investigation of pressure transients in nuclear filtration systems: construction details of a large shock tube

    International Nuclear Information System (INIS)

    Smith, P.R.; Gregory, W.S.

    1980-04-01

    This report documents the construction of a 0.914-m (36-in.)-dia. shock tube on the New Mexico State University caompus. Highly variable low-grade explosions can be simulated with the shock tube. We plan to investigate the response of nuclear facility ventilation system components to low-grade explosions. Components of particular interest are high-capacity, high efficiency paticulate air (HEPA) filters. Shock tube construction details, operating principles, firing sequence, and preliminary results are reported

  14. Economical and industrial impact of nuclear power stations construction in Belgium

    International Nuclear Information System (INIS)

    Labrique, J.; Klees, P.

    1981-01-01

    After a brief introduction the paper analyses the employment in the Belgian nuclear sector with regard to construction, the operation, the engineering of nuclear power plants as well as fuel reprocessing. In the economical section a comparison of the kWh cost of different sources is presented as well as the seasibility of this cost to the raw material price. The future installation of nuclear power plants is discussed and the impact of its delay on the Belgian economy by an absence of decision is analyzed. (AF)

  15. A qualitative model construction method of nuclear power plants for effective diagnostic knowledge generation

    International Nuclear Information System (INIS)

    Yoshikawa, Shinji; Endou, Akira; Kitamura, Yoshinobu; Sasajima, Munehiko; Ikeda, Mitsuru; Mizoguchi, Riichiro.

    1994-01-01

    This paper discusses a method to construct a qualitative model of a nuclear power plant, in order to generate effective diagnostic knowledge. The proposed method is to prepare deep knowledge to be provided to a knowledge compiler based upon qualitative reasoning (QR). Necessity of knowledge compilation for nuclear plant diagnosis will be explained first, and conventionally-experienced problems in qualitative reasoning and a proposed method to overcome this problem is shown next, then a sample procedure to build a qualitative nuclear plant model is demonstrated. (author)

  16. Technology transfer by industry for the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Frewer, H.; Altvater, W.

    1977-01-01

    The construction of nuclear power plants call for a wide sphere of industrial activities, nuclear as well as conventional. For a specific country the ways and methods of developing an industrial nuclear power program and reaching the target of independence, will widely differ, depending on the size of the country, the economic situation, the already existing industrial manufacturing and engineering capacities, the time schedule of the program and the type of contracting. The experience in effective technology transfer for the strengthening and setting up the national industry, and the engineering capacities, needed for the construction of nuclear power plants up to the largest size existing today are considered. The German nuclear power industry gained this experience in connection with the turn-key supply of the first units in various countries. The prerequisites and national nuclear power programs were different. Based on a successful technological development, including standardization, the German nuclear power industry could meet the demand and different approaches in these countries. The main features and practices followed for the transfer of technology is described for three different cases, namely Argentina, Brazil and Iran. (author)

  17. The energy input in the construction and operation of nuclear power stations

    International Nuclear Information System (INIS)

    Kolb, G.; Niehaus, F.; Rath-Nagel, S.; Voss, A.

    1975-08-01

    The production of electric energy requires energy investments not only for direct fuel input but for the construction of power plants and for the extraction of primary energy fuels as well. When the overall energy balance of energy converting systems has to be assessed these energetic investments must be included. In the present investigation the overall energy input of different nuclear power plant types (comprising the nuclear fuel cycle) is computed and compared with a coal-fired plant. Moreover a time-dependent energy balance for the expansion of nuclear capacity according to the existing nuclear programs is calculated. Even applying only Light Water Reactors the nuclear expansion program (with an installed capacity of 50 GWsub(el) in 1985 and 170 GWsub(el) in 2000) would result in an accumulated fossil fuel saving of approximately the tenfold amount of primary energy consumed in the Federal Republic of Germany yearly today. (orig.) [de

  18. Discussion on construction of scientific and technological digital library in nuclear industry

    International Nuclear Information System (INIS)

    Yin Huilan

    2010-01-01

    With the rapid development of digital and network technology, traditional libraries have been unable to meet the needs of the times. Digital libraries will gradually take the place of traditional libraries. Under the circumstances, how will the libraries of the enterprises in nuclear industry face this transformation? This paper gives the brief descriptions and comparative analyses in the four aspects: the definition of the digital library, the meaning of nuclear scientific and technological digital library, the characteristics of the digital library, and major problems in the construction of nuclear scientific and technological digital library that should be solved. Therefore, setting up the digital library is very important. At the same time, it's very necessary and urgent for the libraries of the enterprises in nuclear industry to establish nuclear scientific and technological digital library. (author)

  19. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  20. A comparative study of Japan and United States nuclear enterprise: Industry structure and construction experience

    International Nuclear Information System (INIS)

    Hinman, G.W.; Lowinger, T.C.

    1987-01-01

    Both Japan and the United States have undertaken major programs to utilize nuclear power for central station electricity generation. Over the past 20 years, the Japanese have developed their own construction and government regulatory institutions and now have an essentially independent domestic nuclear power program. Nuclear construction and government oversight of nuclear power have developed somewhat differently in Japan and the United States, reflecting to some extent the two countries' different business and social cultures. In the United States the vendor and utility industries are much more fragmented than those in Japan, and construction projects are carried out on a more competitive basis. The Japanese industry operates through a few well-established consortia while the U.S. industry does not. Relations among the national government, the vendors, and the electric utilities tend to be cooperative in Japan while they are more adversarial in the Untied States. This paper discusses these topics in a framework of a comparative study of the countries' nuclear industries. Whether because of the factors mentioned above or for other reasons the success of nuclear power in Japan and the United States has differed dramatically in recent years. This paper compares the performance of the nuclear enterprise in these two countries in terms of the physical attributes of the plants themselves, the labor required to build them, and the construction times required. It also discusses the relationship between initial estimates of costs and schedules and actual results achieved. On all counts, recent Japanese performance has been better than in the United States

  1. Construction status report: nuclear power plants, data for decisions. Status report

    International Nuclear Information System (INIS)

    1976-01-01

    The document is the 28th edition summarizing the results of a management information system established by the Executive Director for Operations on the construction/fuel load activities of nuclear power plants. The report uses data collected from applicants sponsoring these projects, Office of Inspection and Enforcement, and the Office of Standards Development; and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of 87 plants authorized to engage in construction in Region I through V is summarized in this document. This total includes (4) plants with construction exemptions, and (14) plants with an LWA

  2. Practical experience and problems in the inspection work during construction of nuclear power plants

    International Nuclear Information System (INIS)

    Jansson, E.

    1977-01-01

    Some problems in organizing the regulatory staff in relation to a growing nuclear program are mentioned. Some experiences and problems from the inspection activities during the construction phase are given. Quality assurance and the extent and importance of control and inspection by use of a ''third party'' system is discussed. (author)

  3. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  4. Nuclear power plant construction and financial assistance - as regards subsidies for promotion of power plant siting

    International Nuclear Information System (INIS)

    Shindo, M.

    1983-01-01

    This paper describes the institutional framework for the granting of subsidies in particular to promote nuclear power plant construction in Japan. It also analyses the technical criteria applied and lists the type of improvements to various facilities and equipment made with such subsidies. (NEA) [fr

  5. The Brazilian experience in the civil construction of nuclear power plants

    International Nuclear Information System (INIS)

    Gonzaga, L.A.

    1985-01-01

    The processes and phases of technology absorption, together with the resultant Experience-Factor Model for civil Works, considering philosophy of operation of the civil contractor, design aspects and some structural influences for constructing nuclear power plants are presented. (Author) [pt

  6. The American nuclear construction craftsmen: Will we be ready to build again?

    International Nuclear Information System (INIS)

    Bravo, R.

    1990-01-01

    The present state of nuclear plant maintenance and operations support reflects sexual, ethnic, and radical integration; continued educational advances; some computer literacy; mixed trades in maintenance; detailed training for maintenance and operations work in the operating plant; plant safety awareness and respect; need for top-quality, take the time to do it right mentality; and planning. With no new nuclear construction, what will be the specific talents, focus, and contributions that the craftsmen can be expected to bring to the project? To be prepared to successfully manage the next generation of nuclear plant construction, the industry must be acutely aware of the needs of the labor pool. To be aware of the needs requires an intimate knowledge of the present state of the craft talent, the changed expectations of their contributions, and the effects of new technologies, materials, methods, and individuals that will be used to design and build

  7. Proactive information provision for reducing social construct risk of nuclear facility

    International Nuclear Information System (INIS)

    Kitamura, Masaharu; Takahashi, Makoto; Hashizume, Hidetoshi; Shiraishi, Natsuki; Yagi, Ekou

    2006-01-01

    Outlines of, and the empirical observations from, an action research project aiming at improvement of relationship between nuclear community and the public have been reported in this paper. Ultimate goal of the project is effective reduction of social construct risk of nuclear power plants. As an initial approach to the goal, a proactive information provision scheme has been designed based on the knowledge acquired during our previous attempt of public communication named repetitive dialogue forum. The information contents consistent with the actual need of local citizens has been derived from the previous experiences and provided in the present project. Although the project is in its incipient stage, the observations are informative enough to develop the project further to attain the ultimate purpose of reducing the social construct component of technological risk of nuclear facilities. (author)

  8. Lessons Learned from Design and Construction of New US Nuclear Facility

    International Nuclear Information System (INIS)

    Seamans, S. E.; Horvath, D. A.

    2012-01-01

    For reasons related to licensing uncertainty, economic slowdown, and questionable financial backing, no new nuclear facility projects have been undertaken in the United States since the Three Mile Island Incident in 1979; however, a need for such facilities (both nuclear power plants and nuclear fuel facilities) continues and various incentives leading to the start of a nuclear renaissance have occurred. One incentive is a complete overhaul by the US Nuclear Regulatory Commission of the earlier two step licensing process under 10 CFR 50. The earlier approach required first a construction permit and then an operating license, whereas the new approach allows a more streamlined (one step) combined license (COL) approach utilizing Standard Design Certifications via the regulatory framework created by 10 CFR 52. Other incentives include US Government backed loan guarantees as well as private company contributions. One aspect to the new process has been consideration and implementation of many new topic-specific regulations and industry standards which have continued to evolve during the past 30 years in spite of the lack of new plant design and construction activity. Therefore, an Owner attempting a new nuclear facility project under 10 CFR 52 needs to address a myriad of new requirements previously unconsidered. Several new projects including both power plants and fuel facilities have begun the new licensing process with its many new requirements to consider, but a uranium enrichment facility has run the gamut first. This paper will summarize many of the lessons learned from designing, constructing and testing this first new nuclear facility to be built in the US in over 30 years.(author).

  9. Experiences for construction and preoperation test of Shimane nuclear power station

    International Nuclear Information System (INIS)

    Niki, Yoshiya; Taniguchi, Takashi.

    1975-01-01

    Shimane nuclear power station of Chugoku Electric Power Company has begun its commercial operation on March 29, 1974 after the construction period of 49.5 months. The fundamental construction process which Chugoku Electric Power Company and Hitachi Ltd. had agreed was 45 month process, which was the readjustment of the construction process which General Electric Company had presented for preceding nuclear power plants in Japan and its results. The achieved construction and test process required 49.5 months with 4.5 months delay. This delay occurred in two points. The one was caused by the ''upside down'' problem of control rods which had been imported from G.E. The another was caused by the restriction of the rate of load increasing. Fuel charging which indicates the substantial finish of construction works, had begun at May 1, 1973 on schedule. Therefore it can be said that the construction works had been carried out just according to the fundamental process. However, analyzing the result of progress, the pressure test of a reactor containment vessel and the set-up and the first pressure test of a reactor pressure vessel led the schedule by about 2 months. On the contrary, the subsequent works delayed by just that leading time. (Tai, I.)

  10. Application of RFID to High-Reliability Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Kenji Akagi; Masayuki Ishiwata; Kenji Araki; Jun-ichi Kawahata

    2006-01-01

    In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and general versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described. (authors)

  11. Application of RFID to High-Reliability Nuclear Power Plant Construction

    Energy Technology Data Exchange (ETDEWEB)

    Akagi, Kenji; Ishiwata, Masayuki; Araki, Kenji; Kawahata, Jun-ichi [Hitachi, Ltd. (Japan)

    2006-07-01

    In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and general versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described. (authors)

  12. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  13. ABB.-Combustion Engineering's Experience in Nuclear Power Plant Engineering and Construction in Korea

    International Nuclear Information System (INIS)

    Veris, James W.

    1992-01-01

    The Yonggwang Nuclear Project is a milestone project for the Korean Nuclear Industry. The Project has the two objectives of obtaining self-reliance in all aspects of nuclear technology and of constructing two modern nuclear power plants under the leadership of Korean companies acting as prime contractors. ABB.-Combustion Engineering 1000 MW System 80+ TM was chosen in 1987 as the NSLS design to meet these two objectives. This paper summarizers the significant experiences and lessons learned through the first four years of the Project as well as identifying implications for such future projects. The unique challenges of the project are identified and an evaluation of the experiences in the technology, self-reliance program and in the design and manufacturing processes will be made

  14. Role of civil engineers in design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Sivathanu Pillai, C.

    2015-01-01

    Nuclear energy remains an important element in India's energy mix for sustaining rapid economic growth. In the Indian energy scenario projections for the future, nuclear power through fast reactors has been considered as an important component. Fast reactors are also planned to be built in the medium term to burn minor actinides as means of reducing the burden of radioactive waste management. Nuclear power in India provides 3% of the electricity generated in the country now; it is estimated to go up to 25% by 2050. India has a special interest in developing fast breeder reactors and use of thorium as a source of energy as it has one of the largest reserves of thorium. Nuclear industry always provides challenging works to civil engineers. From geotechnical investigation, structural analysis, design, construction and to material developments and provides unique opportunity for excellence

  15. Social and legal aspects of preparing the construction and operation of a nuclear power source

    International Nuclear Information System (INIS)

    Curin, K.

    1989-01-01

    The main activities are described involved in creating territorial, technical and economic conditions for the building of nuclear power plants. The basic precondition is the prognostic evaluation of national requirements for power in each planning time stage. From this proceeds the need of a range of power sources with a definition of their types and their incorporation in the power system and of possible power supply to the district heating system. As for nuclear power plants the building should be divided into three stages: from planning investments to the issuance of an investment intent, the stage of construction and that of operation. A detailed description is presented of the activities of all participants in building nuclear power plants in Czechoslovak conditions. Attention is devoted to the aspects of reliability and safety of nuclear power plants and to the effect of the respective activities on reliability and safety. (Z.M.). 1 tab

  16. State of the art and further development of reinforced concrete wall cells for nuclear power plant construction

    International Nuclear Information System (INIS)

    Uhlemann, E.; Wartenberg, J.

    1985-01-01

    Reinforced concrete wall cells have been developed for nuclear power plant construction by the USSR and GDR. In this article, a new type of these cells, which will be used for constructing auxiliary equipment of the Stendal nuclear power plant, is described

  17. International comparison of economic and technical indexes of nuclear power plant construction

    International Nuclear Information System (INIS)

    Majer, P.; Fialova, H.

    1988-01-01

    The comparison of capital costs of the construction of nuclear power plants takes into consideration the following aspects: the delineation of the installation, the determination of costs and their break-down, the impact of the time factor, the conversion of the costs to a comparable unit. Power plants are always compared with roughly the same power capacity, this even when conditions for construction are not fully comparable. Construction costs may be divided into, e.g., pre-construction costs, direct capital costs, indirect capital costs, interest during construction. The time factor is manifest in the duration of construction and in the concrete year of construction for which the comparison is being made. The inflationary rise in prices and interests are increasing capital costs by roughly 5 - 8% per annum. The comparison of costs expressed in different currencies is made either by conversion using the rate of exchange or by comparing the time expended for the construction of the power plant. Various methods of comparison are discussed. (J.B.). 7 refs

  18. Long-term prospects of capital demands of nuclear power sources construction in Czechoslovakia

    International Nuclear Information System (INIS)

    Sladek, V.; Kysel, J.

    1988-01-01

    The capital demands are compared for four variants of nuclear power plant construction projects to be implemented in Czechoslovakia by the year 2030. By the year 2000, all variants are expected to achieve the total installed capacity of 11,280 MW. Construction in the following period then differs: by the year 2030 total installed nuclear capacity is to reach the following values: 1st variant - 30,000 MW; 2nd variant - 35,000 MW, 3rd variant - 36,500 MW and 4th variant - 27,760 MW. WWER-1000, WWER-1500 and WWER-500 reactors are expected to be installed in the variant projects which differ in speed of construction and life of the units. They are designed such as to provide for the smooth transfer of building workers from one site to the next. The comparison of capital demands shows that a suitable siting strategy and site preparation can save costs and preclude serious sociological problems. The possible extension of the life of nuclear power plants will provide for a better use of primary investments and improve the economic efficiency of nuclear power plants. (Z.M.). 2 figs., 4 tabs., 6 refs

  19. Assessment of the impact of nuclear power plant construction and operation on small regions

    International Nuclear Information System (INIS)

    Johnson, M.H. Jr.

    1977-01-01

    This study addresses the problem of the comprehensive, quantitative evaluation of the environmental, economic, and social impacts of the construction and operation of nuclear power plant on a given region. A theoretical model of the regional impacts is constructed employing input-output methods that are extended to include ecologic as well as economic effects. Thus, the regional model explicitly incorporates environmental feedback as a consequence of economic activity. The model is then employed to estimate the impact of the construction and operation of a nuclear power facility on a small region in South Carolina. Measures of economic and environmental effects include estimates of changes in output, income, employment, local government revenue and expenditure, external costs of environmental decay, pollution loads, and common-property resource usage. Results indicate that, in the South Carolina case study, significant gains in social welfare accrued to the region due to the construction and operation of the nuclear power facility. Further, the theoretical method developed herein provides a comprehensive method of objectively assessing various types of impacts on a region as small as several contiguous counties or even a single county

  20. Judicial problems in connection with preliminary decision and construction design approval in nuclear licensing procedures

    International Nuclear Information System (INIS)

    Schmieder, K.

    1977-01-01

    Standardization in nuclear engineering makes two demands on a legal instrument which is to make this standardization possible and which is to promote standardization in the nuclear licensing practice: On the basis of just one licence for a constructional part or a component, its applicability in any number of subsequent facility licensing procedures has to be warranted, and by virtue of its binding effect, standardization has to create a sufficiently big confidence protection with manufacturers, constructioneers and operators to offer sufficiently effective incentives for standardization. The nuclear preliminary decision pursuant to section 7 a of the Atomic Energy Act in the form of the component preliminary decision appears to be unsuitable as a legal instrument for standardization, as the preliminary decision refers exclusively to the construction of a concrete facility. For standardization in reactor engineering, the construction design approval appears to be basically the proper legal instrument on account of its legal structure as well as its economic effect. Its binding effect encouters a limitation with regard to third parties in so far that this limitation could question again the binding effect in a subsequent site-dependent nuclear licence procedure. The legal structure of the extent of the binding effect, which is decisive for the suitability of the construction design approval, lies with the legislator. The following questions have to be regulated: Ought the applicant to have a legal claim on the granting of a construction design approval, or ought it to be at the discretion of the authorities, and secondly, the extent of the binding effect in terms of time on the basis of the fixation of a time limit, or on the basis of the possibility of subsequent conditions to be imposed, or the revocation. (orig./HP) [de

  1. Rock cavity construction of a nuclear power plant: a case study

    International Nuclear Information System (INIS)

    Loken, P.C.; Bakke, J.; Gloersen, I.

    1979-01-01

    The major findings of a comprehensive study of the major aspects of rock cavity construction of a large nuclear power plant are: (1) current technology is adequate for the realization of such construction; (2) a method for estimating the probability of rock fallout and gross cavity instability is presently not available; (3) certain design modifications and amplifications must be made to prevent dependent failures; (4) no significant reduction in the immediate radiological effects of Class 9 accidents will result unless special design measures are made for this purpose; (5) the vulnerability of the plant to certain external effects is significantly reduced; (6) the total time for the realization of such construction will be significantly longer than that for a traditionally constructed plant; and (7) the extra cost will be substantial

  2. A Careful Blasting Technique During Construction of underground Openings for Nuclear Waste Repository

    International Nuclear Information System (INIS)

    Ester, Z.; Vrkljan, D.

    1998-01-01

    Underground nuclear waste repositories are constructed in natural rock formations, with heterogenous compound and structure, and should be accommodated in design and construction according to rock conditions. The quality insurance of underground repository, during and after construction, is most demanding in view of contour and category of excavation. the technology of drilling and blasting, regarding the mechanical excavation, is accommodated in sense of response to cross section magnitude of underground openings, the rock conditions and category, the support performance and other design demands. The high level rock damage around underground openings, that is in opposition with reaching quality insurance. Conventional construction technology can be successful by implementation of controlled blasting technique avoiding extensive rock weakness. (author)

  3. Nuclear power plants: data for decisions. Construction status report: data as of July 31, 1977

    International Nuclear Information System (INIS)

    1977-08-01

    This management report is designed to provide the necessary information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of the 91 plants authorized to engage in construction activities in Regions I thru V is summarized in this document. This total includes (4) plants with construction exemptions, and (10) plants with Limited Work Authorization Permits

  4. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  5. Use of virtual environments to reduce the construction costs of the next generation nuclear power reactors

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.

    2007-01-01

    The near term deployment of the next generation of reactors will only be successful if they are built on time and without the costly overruns experienced in the previous generation. One critical factor in achieving these goals is to ensure the design is optimized for constructability. In this work the authors explored the effectiveness of full-scale virtual reality simulation in the optimization of the design and construction of the next generation of nuclear reactors. The research tested the suitability of immersive virtual reality display technology in aiding engineers in evaluating potential cost reductions that can be realized by the optimization of design and installation and construction sequences. The intent of this research is to see if this type of technology can be used in capacities similar to those currently filled by full-scale physical mockups and desktop simulations. Using a fully-immersive five sided virtual reality system, known as a CAVE, the authors constructed a series of virtual mockups that represented two next generation nuclear power plants, the Westinghouse AP-1000 and the Pebble Bed Modular Reactor (PBMR). These virtual mockups were then tested as a design tool to help locate and correct problem areas, to optimize the construction sequence, and to assist with familiarizing trades people with the performance of maintenance activities. A series of experiments were performed to assess the usefulness of these virtual mockups in accomplishing these tasks. (authors)

  6. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models

  7. Analysis and evaluation of status reports for quality assurance practice in nuclear power plant construction

    International Nuclear Information System (INIS)

    1984-01-01

    The study elaborates the structure and definitions of a general description of quality assurance systems with respect to planning and construction of nuclear power plants and indicates standards concerning the production and adaption of structural components. It is suggested to introduce in the licensing procedure the so-called comprehensive constructional report by an expert. For contractors, tasks and responsibilities of the major companies with regard to quality assurance are expressly stipulated. The study also suggests the inclusion of ARGEN, the elaboration of production and test sequence plans and the introduction of a control and evaluation system for the feedback of experience among companies involved and ARGEN. (DG) [de

  8. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models.

  9. A cost summary applicable to seismic construction and maintenance of nuclear safety related piping

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-01-01

    This paper presents a summary of costs applicable to nuclear power plant piping for an earthquake defined as 0.2 SSE-PGA as a function of three eras of initial construction: 1967--1974, 1974--1981 and 1981--1990. Costs have been presented for both new construction and maintenance in operating plants using both the original PSAR-FSAR design criteria and current SRP requirements. It is recommended that the cost information contained in this report be considered in evaluating the cost benefit relationships associated with current and proposed future changes in seismic design procedures applicable to safety-related piping systems

  10. Outline of preparation construction of Shimane Nuclear Power Station No.3

    International Nuclear Information System (INIS)

    Oda, Yasuhiro; Sasaki, Yutaka; Matsukage, Shigeo; Kawahara, Kazufumi

    2004-01-01

    The preparation construction of Shimane Nuclear Power Station No.3 (No.3) started on 15th March in 2004. The main preparation construction consist of the site preparation, revetment works, breakwater works, production of blocks, flood-way and outlet works. The outline of the project is described by the time schedule of work, the cross section of site preparation, site, the revetment method used, the cross section of representative breakwater, structure style and improvement works of flood-way and outlet and content of each works. (S.Y.)

  11. Construction of sustainability indicators for Nuclear Area Innovation and Research Institutes in Brazil

    International Nuclear Information System (INIS)

    Alves, Simone Fonseca

    2017-01-01

    The dissertation consists of a construction of appropriate sustainability indicators for nuclear area innovation and research institutes in Brazil. In order to do so, the results of the construction process, as well as, the perception of the population that resides in the area surrounding this type of institute are presented and discussed. As reference for this case study, the Nuclear Technology Development Center (CDTN) was chosen. It is located in Pampulha, more specifically, on the campus of the Federal University of Minas Gerais (UFMG), Belo Horizonte, MG, Brazil. One of the methodological processes present in this research is the Delphi method, because it is the most used in the construction of indicators. Its application in this work allowed obtaining the of specialist group opinions collected through a questionnaire. Initially, sixty-nine sustainability indicators were considered. They were distributed among the environmental, economic, socio cultural and institutional dimensions, some of which were obtained through lists of indicators pointed by literature review. Other indicators were built through discussions with groups from the nuclear, environmental, economic and socio cultural areas. Among the set of indicators investigated, twenty-six were selected as being the most relevant. A questionnaire was then applied to one hundred and twenty individuals living in the vicinity of the CDTN. Discrepancies were found during the analysis the opinions of the experts in relation to sustainability dimensions proposed, as well as, indicators of the same dimensions were varied. However, the opinion of the population and the opinion of the experts had similar results. Finally, this study is the first proposal for the nuclear sector to construct this kind of indicator that takes into account the evaluation of experts and the opinion of the community that resides around these institutions. (author)

  12. Design and construction rules for electrical equipments of nuclear islands. 3. ed.

    International Nuclear Information System (INIS)

    1993-01-01

    The French design and construction for electrical equipments of nuclear islands (RCC-E) deals with equipments of which the failure may have consequences on the safety of persons or appreciable effects on the availability of the power plant. This book presents the rules concerning (1) qualification procedure, (2) the design of functional units, (3) the installation (environmental conditions, protection rules), (4) the constituent elements of equipments, (5) the control and testing methods

  13. On a new approach to the creation of construction materials of nuclear reactions

    International Nuclear Information System (INIS)

    Kolotushkin, V.P.; Parfenov, A.A.

    2012-01-01

    The acceleration of the recombination of vacancies and interstitial atoms upon neutron irradiation is a decisive factor of an increase in the radiation resistance of construction materials of nuclear reactors. The highest efficiency of the implementation of these processes is achieved when distortions appearing under the synergetic action of neutron radiation and short-range ordering of the crystal lattice are used as traps of vacancies and interstitial atoms [ru

  14. Assessing the effect of nuclear power installation construction and operation on the socio-economic sphere

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    A demographic analysis is made of the area within 25 km from the Dukovany nuclear power plant. The problem is discussed of sources and requirements for manpower for the construction and operation of the power plant. It was found that the capacity of creches and nursery schools for children of power plant employees is inadequate, as are health care facilities for personnel. (E.S.)

  15. Social and psychological problems of nuclear power: perception of NPP construction and environmental risk

    International Nuclear Information System (INIS)

    Malenchenko, A.F.; Sushko, S.N.; Saltanova, I.V.; Tushin, N.N.; Kozlovskaya, A.V.; Bortnovskij, V.N.; Dorofeeva, S.M.; Gapanovich-Kajdalov, N.V.; Gapanovich-Kajdalova, E.V.

    2013-01-01

    The paper presents the analysis of questioning about perception of nuclear power plant construction in Belarus and about concomitant environmental risk. The opinion poll has been conducted among students of: Department of Environmental Monitoring of the International A. Sakharov Environmental University, Physics Department of Belarus State University, Department of General Hygienic and Environmental Medicine of Gomel State Medical University, Faculty of Mechanical Engineering of Minsk Polytechnic College. (authors)

  16. Management self-assessment in construction phase of nuclear power station

    International Nuclear Information System (INIS)

    Shao Bixiu

    2004-01-01

    Management self-assessment is one of the quality management methods to achieve the organization's continuous improvement. Through the investigation of the methods, the author hopes to give guideline to the management at all levels involved in the construction of nuclear power station in the implementation of management self-assessment, and also to make the management self-assessment more normalized, systematical and effective

  17. Environmental assessment report: Nuclear Test Technology Complex. [Construction and operation of proposed facility

    Energy Technology Data Exchange (ETDEWEB)

    Tonnessen, K.; Tewes, H.A.

    1982-08-01

    The US Department of Energy (USDOE) is planning to construct and operate a structure, designated the Nuclear Test Technology Complex (NTTC), on a site located west of and adjacent to the Lawrence Livermore National Laboratory. The NTTC is designed to house 350 nuclear test program personnel, and will accommodate the needs of the entire staff of the continuing Nuclear Test Program (NTP). The project has three phases: land acquisition, facility construction and facility operation. The purpose of this environmental assessment report is to describe the activities associated with the three phases of the NTTC project and to evaluate potential environmental disruptions. The project site is located in a rural area of southeastern Alameda County, California, where the primary land use is agriculture; however, the County has zoned the area for industrial development. The environmental impacts of the project include surface disturbance, high noise levels, possible increases in site erosion, and decreased air quality. These impacts will occur primarily during the construction phase of the NTTC project and can be mitigated in part by measures proposed in this report.

  18. Selection and construction of nuclear and radiation emergency medical center in a region

    International Nuclear Information System (INIS)

    Wang Guojun; He Xu; Liao Li; Gao Dong

    2014-01-01

    Three level of first-class comprehensive hospital is an important force of nuclear and radiation accident rescue, has a very rich experience in response to nuclear and radiation accidents and deal with large quantities of the sick and wounded. With the foundation and the ability of the construction and operation of medical emergency rescue center. This paper according to the median model location theory of emergency center, combined with the specific situation of the nuclear and radiation accident in Hunan Province, reference location, rescue experience, emergency allocation of resources, teaching and research capacity, establish regional medical emergency center of nuclear and radiation accidents based on three level of first-class comprehensive hospital, break the traditional concept that the center must be provincial capital,form a multi-level, three-dimensional, network of emergency hospital rescue system. The main duties of the center are accident emergency response, on-site treatment and technical guidance of accident, psychological grooming. The author propose building measures according to the duties of the center: increase national and provincial financial investment, carry out training, drills and first aid knowledge missionaries regularly, innovative materials management, speed up the construction of information platform, establish and improve the hospital rescue system, improve organization institution and system of plans, reengineering rescue process. (authors)

  19. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  20. Risks and challenges associated with the design and construction of a nuclear power plant; Control de riesgos y retos asociados al diseno y construccion de una central nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Liebana Martinez, B.; Armas Garcia, A.; Martinez Gozalo, I.

    2011-07-01

    The construction of a nuclear power plant project, considering the period prior to the operation of the plant, requires a very strict risk control to ensure compliance with a series of challenges. The present paper identifying the most important challenges facing the construct ability and license requirements of the process, identifying the interfaces and proposing a methodology of construction to meet the challenge of a construction process in 5 years.

  1. Public acceptance of constructing coastal/inland nuclear power plants in post-Fukushima China

    International Nuclear Information System (INIS)

    Wu, Yican

    2017-01-01

    Risk perception and public involvement have become more and more important in post-Fukushima accident era. A survey had been carried out about public acceptance of constructing coastal/inland Nuclear Power Plants (NPPs) in China. We examined impact factors of public acceptance of nuclear energy and also carried out a comparison between China and OECD. The study revealed that the public still took relatively optimistic attitude although there was a slight decrease just after Fukushima and the public's confidence recovered four years later. The ratio of inland NPPs opponents reached to quite a high level and “not-in-my-back-yard” still reflected an obvious syndrome. We also found public acceptance is mainly affected by benefit and, to a lesser extent, by knowledge, education and age. Moreover, the study suggested government is still a creditable information resource due to its authority but most of respondents felt little or no well-informed about nuclear safety, which means a significant communication gap exists between government and the public. As China is the most ambitious country to develop nuclear energy, it is proposed to introduce a transparent and open system of third-party evaluation, which mainly consists of scientists and non-profit research institutions, to ensure the healthy and sustainable development of nuclear energy. - Highlights: • The public are more optimistic about nuclear energy in China than in OECD. • The ratio of inland nuclear power plants opponents reaches to quite a high level. • Government is still a creditable information resource due to its authority. • Third-party evaluation is proposed to intervene in nuclear safety supervision.

  2. Rationalization of design and construction of buildings for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-02-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.).

  3. Rationalization of design and construction of buildings for nuclear power plants

    International Nuclear Information System (INIS)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-01-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.)

  4. Method of constructing lower dry well access tunnel for nuclear reactor container

    International Nuclear Information System (INIS)

    Kume, Tadashi; Furukawa, Hedeyasu.

    1993-01-01

    The method of the present invention facilitates construction of a lower dry well access tunnel for a nuclear reactor container. The lower dry well access tunnel is constructed across the reactor container and the reactor main body foundation. In this case, the lower dry well access tunnel is divided into three sections, i.e., axial end portions and a central portion. At first, each of the end portions is attached to the walls of the reactor container and the reactor main body foundation respectively. Subsequently, the central portion is attached to each of the end portions. An adjusting margin is previously provided to the central portion upon manufacturing each of the sections for adjusting deviation from a nominal size upon construction. In such a construction method, it is possible to eliminate interference accident during construction between the end portions of the lower dry well access tunnel and the reactor container and the reactor main body foundation, to facilitate the construction. Further, this facilitates the fabricating operation for dimensional alignment between the lower dry well access tunnel, and the reactor container and the reactor main body foundation. (I.S.)

  5. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  6. Special issue on start of construction of the Ohma nuclear power plant of J-Power

    International Nuclear Information System (INIS)

    Takahashi, Taizo

    2008-01-01

    The Electric Power Development Co., Ltd. (J-Power) started construction of its Ohma nuclear power plant - a 1383 MWe Advanced Boiling Water Reactor (ABWR) - in Aomori prefecture on May 2008. The reactor of the Ohma plant will be the first to load MOX fuels in all of its reactor cores. It will be able to consume a quarter of all the recycled MOX fuels produced at Rokkasho reprocessing plant and hence make a major contribution to Japan's policy of recycling plutonium recovered from spent fuels. Special issue reviewed history and overview of the Ohma plant as well as its significance to enhance power generation portfolio in corresponding with national interests. Local governor's expectations and present state of the Ohma plant were also described. After preparation works, construction began on excavation of foundation for the service building, proceeding as always with safety the foremost priority during construction. (T. Tanaka)

  7. Experience in constructing a spent nuclear fuel reprocessing plant in Japan

    International Nuclear Information System (INIS)

    Hashimoto, K.; Sakuma, A.; Inoue, K.

    1977-01-01

    Towards the end of 1970, Japan Gasoline Co. Ltd. (JGC) and Saint-Gobain Techniques Nouvelles of France received an order for the construction of a reprocessing plant from Power Reactor and Nuclear Fuel Development Corporation, as a joint prime contractor. The work executed by JGC in this project is reported and consisted of: (1) Procurement, inspection and schedule control of equipment and materials other than those imported from Europe; (2) Conclusion of contracts with various subcontractors relating to the building construction, piping and other work; and (3) Supervision of field work. The field work began in June 1971 and was completed in about 40 months. The overall field labour mobilized during that time totalled about 410,000 man-days, and 900,000 man-hours were spent by the JGC engineers. With the object of constructing a high-quality plant, JGC since 1969 has started to investigate subcontractors in Japan as well as undertaking the selection, education and training of prospective subcontractors. For the welding work in particular, techniques were imported from France and domestic techniques were developed at the same time. Completion of the blank tests was estimated to require 33 months, but the schedule was delayed about seven months for various reasons. Obviously there is room for many improvements when constructing future nuclear chemical plants. However, careful consideration should also be given from the basic design stage onward, to the methods and sequence of construction so that a simplified plan can be obtained from which the work could be easily executed without resorting to special technology. This would lead to reduction in construction time, and a safer and more reliable plant at lower cost. (author)

  8. Country Report Summary: Japan [Project Management in Nuclear Power Plant Construction: Guidelines and Experience

    International Nuclear Information System (INIS)

    2012-01-01

    The Hokkaido Electric Power Company (HEPCO) is the owner of the Tomari NPP comprising three operating PWR units. The latest unit to be connected to the grid, Tomari Unit 3, is a 3-loop PWR power plant with an electric output of 912 MW(e) supplied by Mitsubishi Heavy Industries (MHI). This is the newest unit in HEPCO and it is the newest PWR unit in Japan as well. The first concrete at Tomari Unit 3 was poured at the end of summer in 2004. The unit entered into commercial operation in December 2009. The Tomari site is located on a northern Japanese island. It is battered by strong winds and receives much snow in the winter. Therefore, civil works and building construction were temporarily suspended every year from the beginning of December until the end of March. This increased construction duration by one year compared to other sites. Consequently from first concrete to the start of commercial operation construction at Tomari lasted 64 months. There are specific factors in the approach to construction of nuclear power plants in Japan. (1) Japanese legislation defines that the sole licensee must be the electric power company. This implies that the electric power company is responsible for the safety of the plant and in that capacity it must submit for approval the Safety Analysis Report (SAR) but it is also responsible for the design and reliability of the plant; hence it must also submit for approval the Construction Plan (CP), containing all necessary detailed design information. Consequently, the electric power company becomes the sole counterpart to the regulatory body on all aspects of the project. (2) All Japanese electric power companies are considerably large and have the tradition to do the engineering of their power plant themselves, and this not only for nuclear but also for conventional power plant. Therefore, the owner/utilities in Japan carry themselves the burden of major portions of the engineering, procurement and construction (EPC) of their NPPs

  9. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  10. Density and moisture measurements by nuclear method and its application to compaction control in road construction

    International Nuclear Information System (INIS)

    Mohd Azmi Ismail

    1994-01-01

    The application of nuclear technique in civil engineering sector which emphasises on the in-situ density and moisture measurements of soil in road construction is discussed. The nuclear density-moisture gauge utilises both gamma-rays and neutrons for the determination of the density and moisture content, respectively. The knowledge on the density and moisture content will be used to evaluate the degree of compaction of the compacted layers. The technique offers not only a fast and non-destructive measurement but it is also accurate, economical and repeatable. A calibration equation which is stored in the built-in microprocessor is applicable for any type of soil. Corrections for the interferences from needless gamma-rays produced as a result of thermal neutrons interaction with certain nuclei for the density measurement and effects of hydrogen other than absorbed water for the moisture measurement are considered in the equation. This paper describes briefly the theory and the characteristics of the nuclear gauge and its application in road construction work

  11. Construction of Kashiwazaki-Kariwa Nuclear Power Station Results of manufacturing concrete

    International Nuclear Information System (INIS)

    Morishita, Hideki; Tsuchiya, Yoshimasa; Eguchi, Kiyoshi; Hosaka, Hiroshi

    1998-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station of Tokyo Electric Power Co., Inc. was completed in July, 1997. Seven nuclear power plants generate about 8.2 million kW, and it is the largest nuclear power station in the world. In the construction, from May, 1980 to August, 1996, the concrete of 2.42 million m 3 for architecture and 1.04 million m 3 for civil engineering, 3.46 million m 3 in total, and the mortar for artificial rock bed of 430,000 m 3 were manufactured and placed. The results of manufacturing concrete from beginning to finish are shown. The specification of concrete was different for No. 1 plant, No. 2 and 5 plants, No. 3 and 4 plants and No. 6 and 7 plants. As to the mixing of concrete, the specification and the materials used are reported. The features of the facilities for manufacturing concrete are explained. The flowchart of the quality control of materials and concrete is shown. The material testing of cement and aggregate, the test of water quality and the material testing of admixtures were carried out. As for concrete, the weight of unit volume, slump, air quantity, concrete temperature, chloride content, strength and alkali reactivity were examined. (K.I.)

  12. French codes and standards for design, construction and in-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Hugot, G.; Grandemange, J. M.

    1995-01-01

    In 1970, France decided that its future power plants would be of the Pressurized Water Reactor type. This choice proved to be successful since it resulted in more than 60 PWR units in operation or under construction in France and abroad. At the beginning of such a program, the French engineering and manufacturing industry, the national electrical utility and the Safety Authorities had to face the many challenges imposed by the implementation of an imported technology. The government reorganised the licensing process. FRAMATOME, the NSSS vendor, and EDF (Electricite de France), the national utility, decided to create 'AFCEN', the French Association for Design and Construction Rules for Nuclear Island Components. These rules, the RCC's (Regles de Construction et de conception), which are approved by French Safety Authorities deal with mechanical and electrical equipment as well as with nuclear fuel and civil works. They are now being supplemented by in service inspection rules, the RSE's (Regles d'inspection en Service). The paper presents these Codes and their main updating following experience of application, technical progress and evolution of standards. Status of discussion concerning reference to European standardisation and developments of rules applicable to the EPR project will also be discussed

  13. Design, construction and testing of replacement nuclear coolant pump stators to meet today's equipment reliability expectations

    International Nuclear Information System (INIS)

    Fostier, L.; Howell, D.

    2005-01-01

    The reliability expectations of equipment and components in today's nuclear power plant are much greater than three or more decades ago when nuclear plants were first constructed due to economic impact of a failure. Very few components in a pressurized water reactor plant can have as much impact of the plants capacity factor as a catastrophic failure of a reactor coolant pump winding. This paper describes the maintenance approach taken by one North American utility in attempt to preclude such failures. The paper will discuss the challenges of the reactor coolant pump application and the enhancements made in the winding design and construction by the supplier to address failure mechanisms so as to better meet present reliability expectations in accordance with dedicated specifications. The paper will also present the in-process and final testing requirements and limits imposed in an attempt to ensure quality of the machine windings, along with selected test results from the stators that have been designed and constructed to these specifications to date. (author)

  14. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  15. An economic analysis of the effects of regulatory delay on nuclear power plant construction. Technical report

    International Nuclear Information System (INIS)

    Maloney, M.T.; Walsh, M.D.

    1980-08-01

    In order to evaluate the impact that any government regulation has on society, an accurate measure of the costs imposed by the regulation is essential. Current government estimates of the cost of pollution control legislation have failed to include the costs of project delays that firms may experience when complying with such standards. Clearly, if these delays are the direct result of such legislation their costs should be included for a proper evaluation. The purpose of this report is to define and measure the true impact that construction deals have on the total project costs of a specific industry. The Nuclear Power Industry has been chosen to illustrate the problem. First, the industry is examined in terms of its economic and physical environment. A model is then developed to deal with the costs involved in the construction of a typical nuclear plant. The model is tested by regressing time and cost data of 31 completed plants to determine the impact that unanticipated delays have had on total project costs. These results indicate that such delays would increase the total project costs of a typical 1,000 mw plant by .8 percent per month in the initial stage of the project and 1.1 percent per month after actual construction begins

  16. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  17. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  18. Design and construction features of steam generators at a nuclear power station

    International Nuclear Information System (INIS)

    Chakrabarti, A.K.; Gupta, K.N.; Bapat, C.N.; Sharma, V.K.

    1996-01-01

    The Indian nuclear power programme is based on Pressurised Heavy Water Reactors (PHWRs) using natural uranium as fuel and heavy water as reactor coolant as well as moderator. The nuclear heat is generated in the fuel located in the pressure tubes. Pressurised heavy water in the primary heat transport (PHT) system is circulated through the tubes which picks up the heat from the fuel and transfers it to ordinary water in steam generators (SGs) to produce steam. The steam is used for providing power to the turbine. The steam generator is a critical equipment in the nuclear steam supply system (NSSS) of a nuclear reactor. SG tube surface area constitute about 80% of total primary circuit surface area. A typical value in a 220 MWe reactor is 9000 m 2 which can release considerable amount of corrosion products unless very low corrosion rates are achieved by proper design, material selection and water chemistry control. Design and construction features of SGs are given. 1 tab

  19. Environmental studies in conjunction with the construction of nuclear power plants Pt. 2

    International Nuclear Information System (INIS)

    Horvath, L.G.; Bede, G.; Gacs, I.

    1980-01-01

    A status-of-the-art report is presented to summarize the studies in progress in Hungary concerning the radionuclide release of nuclear power plants and the motion and migration of radionuclides in the atmosphere. The presently available computerized models are described, their objectives, performances and advantages are discussed. Some examples are given to illustrate the applicability of the various models. They will be adapted to the local environmental, meteorological and architectural conditions of the Paks nuclear power plant under construction. The cooperation of research groups participating in the development or adaption of the different computerized models will continue during the start-up and operation of the Paks-1 reactor and the models will be improved on the basis of field experiences. New models will also be developed. (D.Gy.)

  20. First decade: TVA's first ten years of nuclear power plant design and construction experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1978-01-01

    This paper reviews the experience of the Tennessee Valley Authority's design and construction program for nuclear power plants in terms of schedule and capital costs in three separate phases. Phase one recapitulates the status of the nuclear power industry in 1966 and sets forth the assumptions used for estimating capital costs and projecting schedules for the first Tennessee Valley Authority units. Phase two describes what happened to the program in the hectic early 1970s in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next 10-year period. 7 figures, 7 tables

  1. Feasibility study on floating nuclear power plant (1). Conceptual design study of FNPP. Construct research

    Energy Technology Data Exchange (ETDEWEB)

    Yabuuchi, Noriaki; Shimazaki, Junya; Ochiai, Masaaki [Department of Nuclear Energy System, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai, Ibaraki (Japan); Takahashi, Masao [Niigata Engineering Co. Ltd., Tokyo (Japan); Nakazawa, Toshio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Sato, Kazuo [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan)

    2001-02-01

    Offshore siting methods for a nuclear power plant are classified into three types as a floating type, a settled type and a land reclamation type. The floating nuclear power plant (FNPP) has a number of advantages, such as seismic isolation, standardization of design and manufacturing, and reduction of construction period. It is, however, required for FNPP to establish the safety standards, which are different from ones for land based nuclear power plant. Investigations for this subject have not been conducted sufficiently. In this report, design study on a concept for FNPP and a review on stability evaluation for the floating platform, which were performed in order to study the safety concept of the FNPP are described. The basic concept of the FNPP are described. The basic concept for FNPP is as follows: The FNPP is sited approximately 1 - 2km off the sea coast on the open sea with water depth of about 20m and it is moored of protected sea by the breakwater, it provide a floating platform for a 1,100MWe class PWR plant. The results of design study show that the floating platform for 1,100MWe class PWR plant of 300m (L) x 80m (W) x 35m (H), and displacement of approximately 300,000 ton can be constructed in a dockyard. This floating platform guarded by the breakwater is found to be stable enough to install the nuclear power plant from the analysis simulating the movement of the platform due to sea wave or wind. (author)

  2. Construction and tests of a gamma device for experimental measurements of burnup of nuclear reactor fuel

    International Nuclear Information System (INIS)

    Brandao Junior, F.A.

    1982-01-01

    The gamma-scanning method is an important tool for the measurement of burnup of nuclear reactor fuel. The adequate knowledge of burnup allows for a better inventory of 'sensitive' fissile materials, better fuel management and provides insight on fuel behaviour and safety margins. This paper is related to the description, construction and operation of a first gamma scanning device, tested by irradiation of prototype PWR fuel pins, 14 cm long, in a Triga Mark-I reactor at very low power. Despite the limitations imposed by the low burnup, the experiment permitted a good checking of the main physical concepts and devices involved in the method. (Author) [pt

  3. Determination of karst collapse intensity indicator in area of nuclear power plant construction using incomplete data

    International Nuclear Information System (INIS)

    Sharapov, R

    2014-01-01

    The paper deals with the definition of karst collapse intensity. The technique for determining the intensity of karst formation and collapse on the basis of calculation and probabilistic method is given. Karst collapse formation is affected by a great variety of natural and anthropogenic factors. Each factor can vary quite widely. The paper describes a technique for determining karst collapse intensity from incomplete data. It uses karst processes monitoring data in the area and monitoring data of areas with similar values of the most significant factors leading to the karst collapses. The method used for determination of karst collapse intensity indicator in area of Nizhny Novgorod nuclear power plant construction

  4. Fire protection programme during construction of the Chashma nuclear power plant

    International Nuclear Information System (INIS)

    Mian Umer, M.

    1998-01-01

    A clear view is given of several measures that have been taken with regard to fire prevention, protection and fire fighting during all phases of the construction, installation and commissioning of the Chasma nuclear power plant to protect personnel and equipment so that any delays in plant operation as a result of fire incident can be avoided. These measures include the precautions taken, the provisions made for fire extinguishers and hydrants, and the setting up of a fire brigade. An overview is also given of the fire incidents that have occurred. (author)

  5. Flood control construction of Shidao Bay nuclear power plant and safety analysis for hypothetical accident of HTR-PM

    International Nuclear Information System (INIS)

    Chen Yongrong; Zhang Keke; Zhu Li

    2014-01-01

    A series of events triggered by tsunami eventually led to the Fukushima nuclear accident. For drawing lessons from the nuclear accident and applying to Shidao Bay nuclear power plant flood control construction, we compare with the state laws and regulations, and prove the design of Shidao Bay nuclear power plant flood construction. Through introducing the history of domestic tsunamis and the national researches before and after the Fukushima nuclear accident, we expound the tsunami hazards of Shidao Bay nuclear power plant. In addition, in order to verify the safety of HTR-PM, we anticipate the contingent accidents after ''superposition event of earthquake and extreme flood'', and analyse the abilities and measures of HTR-PM to deal with these beyond design basis accidents (BDBA). (author)

  6. Investor's experience with keeping fixed costs during the construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Cecil, P.

    1990-01-01

    The introduction of fixed costs in the construction of the Temelin nuclear power plant should secure stabilization of budget cost and prevent its increase. The differences between the fixed costs method and the procedure used so far are briefly described. The introduction of fixed costs was to be followed by the corresponding legal regulations; however, the legal adjustment has not been carried out in the desired completeness. The reason is the difference in understanding the notion of fixed costs by the investor, the contractor and the designer. Another problem is the difference in the level and the detail of the initial project design and of the Soviet implementation designs. The investor believes that the introduction of fixed costs has not yet met with the desired response by organizations participating in the construction. (J.P.)

  7. Experience in construction of a spent nuclear fuel reprocessing plant in Japan

    International Nuclear Information System (INIS)

    Hashimoto, K.; Sakuma, A.; Inoue, K.

    1977-01-01

    In June 1970, Japan Gasoline Co., Ltd (JGC)and Saint-Goblan Techniques Nouvelles of France received an order for the construction of a reprocessing plant from Power Reactor and Nuclear Fuel Development Corporation, as a joint prime contractor. JGC was responsible for: procurement, inspection, and schedule control of equipment and materials other than those imported from Europe; for conclusion of contracts with various subcontractors relating to the building construction, piping, and similar work; and for supervision of field work. Field work began in June 1971 and was completed in about 40 months. This paper describes the experiences of JGC during the period of the entire operation, and on the basis of this experience recommends modifications to their approach to similar projects in the future

  8. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  9. Financial qualifications review of applicants for nuclear power plant construction permits

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; Mullen, M.F.; Carr, D.B.

    1988-09-01

    The NRC and its predecessor the AEC have had a regulatory requirement since 1956 that utilities seeking a construction permit for a nuclear power plant be financially qualified to construct and operate the plant. Several amendments to the requirements were made over the years including an attempt in 1982 to drop financial qualification review for electric utilities. This attempt was subsequently found invalid by a federal court. Nevertheless, financial qualification reviews consume significant amounts of NRC staff time and time at Atomic Safety and Licensing Board hearings. The analysis reported in this study was conducted to determine whether there is any empirical evidence of a relationship between a utility's financial health at the time of its construction permits application and the subsequent safety performance of the operating plant. The principal financial measures used to test for this relationship were bond rating, interest coverage ratio, debt/asset ratio, debt/equity ratio, and rate of return on equity. The principal safety measure was the long-term average of the scores assigned the utility in four key areas by the NRC under the Systematic Assessment of Licensee Performance program. The results of the analysis showed no evidence of a relationship between financial health at the time of the construction permit and subsequent safety performance. 7 refs., 16 figs., 4 tabs

  10. Application of large-scaled pre-cast components for the construction of water intake for a nuclear power plant

    International Nuclear Information System (INIS)

    Topolnicki, M.

    1976-01-01

    Problem of the construction of water intake for a 4000 MW nuclear power plant located at the seashore is solved. The advantages of application of large-size pre-cast components are presented,. The constructional solutions and proposed technologies are described in detail. (A.S.)

  11. Model of a Nuclear Security Naval Agency for radiation control of the Industrial Complex of of Submarine Construction and Maintenance Ship with Nuclear Propulsion

    International Nuclear Information System (INIS)

    Lins Junior, Amilton de Sousa

    2017-01-01

    Due to the construction, by Brazilian Navy, of a Submarine Construction and Maintenance Ship with Nuclear Propulsion, where, among other activities, the commissioning and exchange of the fuel elements of the reactor in the future Nuclear Submarine, and of a Naval Base where the Nuclear Submarine and the Conventional Submarines, it is necessary the establishment of a Nuclear Security Naval Agency to monitor activities involving ionizing radiation sources and nuclear materials aimed at the radiological protection of exposed occupationally individuals (IOE), the general public and the environment. It should be noted that nuclear and radioactive material will be present only in a part of the yard called Radiological Complex. Therefore, the development of a structure for the control of the Radiological Complex is fundamental, considering that the future licensing process will be unprecedented in Brazil and will face several difficulties. This work presents a model of a structure for the radiological control of the industrial complex for the construction and maintenance of the submarine with nuclear propulsion, as well as the fundamental concepts of the activities, such as inspection, regulations and authorizations, to be carried out by the various component sectors of the Nuclear Security Naval Agency. (author)

  12. Participation of SKODA JS in the construction of the Temelin and Mochovce nuclear power plants

    International Nuclear Information System (INIS)

    Svec, A.; Zach, J.; Ruzicka, P.

    2000-01-01

    SKODA JS is the traditional manufacturer of WWER type reactor equipment and also supplier of the primary circuits and of equipment for the transport, refuelling and storage of fuel for Ver type nuclear power plants built in the Czech and Slovak Republics. The paper deals with activities of the company SKODA JS at two power plants whose reactor units are close to completion, viz. the Mochovce NPP in the Slovak Republic (4 x Ver 440 MW; unit 1 was put in operation in 1998, unit 2 is in the stage of commissioning, units 3 and 4 are not to be completed) and the Temelin NPP in the Czech Republic (2 x Ver 1000 MW, commissioning of units 1 and 2 is expected in 2001 and 2002, respectively). The scope of supplies to the two nuclear power plants (detailed design, delivery of equipment, installation, commissioning) and the course of construction from SKODA JS's viewpoint are described. The most important design changes and improvements made during the construction are highlighted. (author)

  13. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  14. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  15. Looking back on safety management in construction of advanced thermal nuclear power plant 'Fugen'

    International Nuclear Information System (INIS)

    Emori, Kengo

    1979-01-01

    The safety management of the advanced thermal nuclear power plant ''Fugen'' during the period from the preparation of plant construction in October, 1970, to the full power operation in March, 1979, is looked back and explained. Any large human and material accidents did not occur during the long construction time. The total numbers of persons and hours were 1.397 x 10 6 workers and 11.55 x 10 6 hours, respectively. The number of labor accidents was twenty with no dead person, the number of loss days was 645 days, the number of accident rate was 1.73, the intensity rate was 0.06, and the mean rate of labor accidents per year per 1000 workers was 6.4. The radiation exposure dose was 65.27 man-rem for the managed 1804 workers in total, during the testing and operating periods. These data show that the safety management for ''Fugen'' is very excellent, considering the following special features: 1) there were many works which were carried out for the first time, 2) the construction of the plant was conducted by five contractors taking partial charge, there were many kinds of construction works, the construction and testing periods were long, and the workers had to go to the site from Tsuruga city by car and bus. The organization of preventing disasters, the concrete implementation items for safety management, including the planning of activities, various meetings, patrol, education and training, the honoring system, the prevention of traffic accident and so on, and the results of actual safety management are explained with the reflection. (Nakai, Y.)

  16. Construction, start-up and operation of Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Hornicek, Z.

    1989-01-01

    The Labor Safety Inspectorate have been supervising the construction of the Dukovany nuclear power plant since the construction start in 1977. It was found that in concreting the reactor building walls with concrete mixes, the regulations were not observed on the highest level for the concrete mix drop, and on the gap processing and concrete treatment when concreting was interrupted. Thus, concreting was halted until the conditions for concreting were met. Attention was focused on the protection of the hermetic casing from damage, which had very often happened. A number of shortcomings were detected in storing technology parts. The cleanliness was inspected of the facilities being assembled. The inspections also revealed shortcomings in sealed space tightness. The inspections of assembly and testing of facilities showed failures of the facilities themselves (control valves, electric motors, filter and pump sealing) and of the assembly process. Faults were also detected in electrical equipment. Only a very small part of the installation showed lifetime as specified by Decree 105/1982 Coll. laws on safety assurance in the nuclear power industry. Missing data in documentation led to delays in the start-up stages. The State Surveillance Body also inspected the results of equipment testing. Prior to physical start-up, all production facilities and buildings were inspected, labor safety was inspected for all personnel in communicating corridors, staircases, manholes and onservice and handling posts. Shortcomings were removed. The organization of assembly work was a considerable problem if staff from more organizations had to work together in the same workplace. A list of tasks is presented of State Surveillance Body in operation, maintenance, outages, repairs, and troubleshooting in a nuclear power plant. (J.B.)

  17. A Systems Engineering Framework for Design, Construction and Operation of the Next Generation Nuclear Plant

    International Nuclear Information System (INIS)

    Edward J. Gorski; Charles V. Park; Finis H. Southworth

    2004-01-01

    Not since the International Space Station has a project of such wide participation been proposed for the United States. Ten countries, the European Union, universities, Department of Energy (DOE) laboratories, and industry will participate in the research and development, design, construction and/or operation of the fourth generation of nuclear power plants with a demonstration reactor to be built at a DOE site and operational by the middle of the next decade. This reactor will be like no other. The Next Generation Nuclear Plant (NGNP) will be passively safe, economical, highly efficient, modular, proliferation resistant, and sustainable. In addition to electrical generation, the NGNP will demonstrate efficient and cost effective generation of hydrogen to support the President's Hydrogen Initiative. To effectively manage this multi-organizational and technologically complex project, systems engineering techniques and processes will be used extensively to ensure delivery of the final product. The technological and organizational challenges are complex. Research and development activities are required, material standards require development, hydrogen production, storage and infrastructure requirements are not well developed, and the Nuclear Regulatory Commission may further define risk-informed/performance-based approach to licensing. Detailed design and development will be challenged by the vast cultural and institutional differences across the participants. Systems engineering processes must bring the technological and organizational complexity together to ensure successful product delivery. This paper will define the framework for application of systems engineering to this $1.5B - $1.9B project

  18. Impact of Nuclear Power and Desalination Plant Construction Toward National and East Java Economic

    International Nuclear Information System (INIS)

    Ratya-Anindita; Sriyana; M-Nasrullah

    2006-01-01

    The objective of this study is to determine the economic impacts of the construction of the nuclear power plant 2 x 100 MW(e) SMART type with desalination 4 x 10,000 m 3 which would conduct in years 2008 to 2017 in Madura Island, East Java. The predicted IO tables of 2008-2017 have been created by the application of dynamic IO projection. The economic impact was estimated through multiplier effect which covers direct impact and indirect impact as well as the induced effect. The expenditures of SMART nuclear power and desalination plant to the domestic contractors is estimated to amount to 88.2 million US dollar or 25.6 % of the whole expenditures. The total impact of the project to the national economy would be Rp. 6,329,347 million, Rp. 8,439,130 million, and Rp. 12,658,695 million for each scenario of the exchange rate as high as Rp. 7,500/US dollar, Rp. 10,000/US dollar, Rp. 15,000/US dollar, respectively for the scenario of dynamic growth. The total impact of the project to the provincial economy of East Java would be as much as Rp. 3,253,498 million, Rp. 4,337,997 million, and Rp. 6,506,995 million for each scenario of the exchange rate as high as Rp. 7,500/US dollar, Rp. 10,000/US dollar, Rp. 15,000/US dollar, respectively under the former scenario. Cumulative direct impact since pre-construction to construction period had been calculated as much as US dollar 101.8 million for sectors number 48.52 and 62. This have brought much impact on other sectors in national or provincial levels of economy. (author)

  19. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  20. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  1. RCC-M: Design and construction rules for mechanical components of PWR nuclear islands

    International Nuclear Information System (INIS)

    2017-01-01

    AFCEN's RCC-M code concerns the mechanical components designed and manufactured for pressurized water reactors (PWR). It applies to pressure equipment in nuclear islands in safety classes 1, 2 and 3, and certain non-pressure components, such as vessel internals, supporting structures for safety class components, storage tanks and containment penetrations. RCC-M covers the following technical subjects: sizing and design, choice of materials and procurement. Fabrication and control, including: associated qualification requirements (procedures, welders and operators, etc.), control methods to be implemented, acceptance criteria for detected defects, documentation associated with the different activities covered, and quality assurance. The design, manufacture and inspection rules defined in RCC-M leverage the results of the research and development work pioneered in France, Europe and worldwide, and which have been successfully used by industry to design and build PWR nuclear islands. AFCEN's rules incorporate the resulting feedback. Use: France's last 16 nuclear units (P'4 and N4); 4 CP1 reactors in South Africa (2) and Korea (2); 44 M310 (4), CPR-1000 (28), CPR-600 (6), HPR-1000 (4) and EPR (2) reactors in service or undergoing construction in China; 4 EPR reactors in Europe: Finland (1), France (1) and UK (2). Content: Section I - nuclear island components, subsection 'A': general rules, subsection 'B': class 1 components, subsection 'C': class 2 components, subsection 'D': class 3 components, subsection 'E': small components, subsection 'G': core support structures, subsection 'H': supports, subsection 'J': low pressure or atmospheric storage tanks, subsection 'P': containment penetration, subsection 'Q': qualification of active mechanical components, subsection 'Z': technical appendices; section II - materials; section III - examination

  2. Notes on third party liability for nuclear damage in connection with the construction of the first nuclear power plant in Brazil

    International Nuclear Information System (INIS)

    Simoes, A.C.

    1975-01-01

    Responsibilities for the construction and operation of the first nuclear power plant have been transferred from the National Nuclear Energy Commission to Electrobras, a public undertaking set up for this purpose. In view of such transfer of responsibilities and the implementation of further nuclear power projects, liability for nuclear damage has to be regulated in a way consistent with international conventions. A working group associating representatives of national authorities and public utilities was entrusted with the task of drafting rules for co-ordinating their respective activities in relation to the execution of the first nuclear power project; these rules were issued by Ministerial order in 1970. The working group also prepared a draft law on civil liability for nuclear damage, based on the Vienna Convention. This draft law has reached its final stage and, after promulgation, will enable Brazil to ratify the Vienna Convention. (author)

  3. The Finnish Experience with the Construction of Onkalo. Licensing of a repository for nuclear waste in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2014-01-01

    Pursuant to the Nuclear Energy Act (990/1987), a license holder whose operations result, or have resulted, in the generation of nuclear waste must perform all measures included in the management of nuclear waste and preparation thereof and bear all the costs of nuclear waste management. Under law, spent nuclear fuel is regarded as nuclear waste. According to the amendment made to the Nuclear Energy Act in 1994, nuclear waste generated in Finland must be handled, stored and permanently disposed of in Finland. Nuclear waste generated elsewhere may not be handled, stored and permanently disposed of in Finland. The Finnish nuclear legislation defines spent fuel as nuclear waste and requires that it has to be disposed of in the Finnish bedrock. Over 30 years of systematic R and D has been carried out to develop the repository concept, site selection, technologies, safety assessment and the regulatory approach. Activities are based on the Finnish Government's long term strategies since 1983. The stepwise development and future plans for disposal are presented in Table 1. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act (990/1987) and Decree (161/1988). These licensing steps are: - Decision in Principle (DiP); - Construction License; - Operational License. An Environmental Impact Assessment (EIA) shall be conducted prior to the first authorization step of a major nuclear waste facility. The EIA procedure for the final disposal of spent nuclear fuel from three units of the Olkiluoto nuclear power plant and two units of the Loviisa nuclear power plant was carried out in 1998-1999 and extended to one more unit at Olkiluoto in 2008- 2009. Pursuant to the Nuclear Energy Act, before making the DiP the Government shall ascertain whether the municipality planned as the location of the nuclear facility is in favour of the facility, and ensure that no facts indicating a

  4. No halt to the construction of Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The grounds upon which the judgment of Koblenz Administrative Court (Verwaltungsgericht) of 1-8-1975 - 7 L 14/75 - was based are now available. In this decision, the action of the city of Neuwied for restitution of the action to set aside (motion to stay the immediate execution of) the First Partial License for the construction of the 1,200 MW nuclear power station at Muelheim-Kaerlich was dismissed. The costs of the administrative procedures, including the extra-judicial costs of the persons summoned to appear in court, are imposed upon the applicant. The value in litigation of the procedures following the motion to stay proceedings was fixed at 50,000 DM. The sometimes contradictory grounds of paragraph II are given in full wording and commented upon. (orig./AK) [de

  5. Discussion on management of earth and rock balancing during the construction of Fuqing nuclear power plant

    International Nuclear Information System (INIS)

    Yan Yingdi; Gu Jian

    2013-01-01

    The main purpose of earth and stone work for Fuqing nuclear power plant is to solve problems of the main plant and the temporary accommodation site and also providing aggregate, marine stone and backfill as well. For a reasonable arrangement of stacking, using and spoiling, a dynamic balance management is performed in the project based on the initial design by the plant design institute. The design result would be used to conduct the construction arrangement, for avoiding the risk of earth and stone shortage, and enhancing the economic benefits. By discussing on problems existed in the balanced management of earth and stone, some suggestions are raised in this paper for optimizing earth and stone medium-and long-term management. (authors)

  6. Experience with construction and assembly of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Prochazka, J.; Stepanek, S.; Drahy, J.

    1981-01-01

    The model is discussed of the constructions of the V-1 nuclear power plant at Jaslovske Bohunice with SKODA Trust fulfilling the role of the general supplier of the secondary part technology and the chief and special assembly contractor. The SKODA Trust mediated the Soviet supplies of technology, Soviet assembly and special assembly, and the mounting of the primary part according to Soviet projects. Plant start-up was safeguarded by the investor through Bohunice power plant staff and Soviet experts. The assembly of the primary circuit and the test assembly of reactor parts are described and the experience gained is discussed. The technological requirements are illustrated by the most important characteristics of the individual parts of the primary circuit. Also described are the design specifications of the 220 MW saturated steam turbine and the experience with its assembly and start-up. (B.S.)

  7. Housekeeping during the construction phase of nuclear power plants - approved 1973

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Housekeeping requirements are presented for the control of work activities, conditions, and environments that can affect the quality of important parts of a nuclear power plant during the construction phase. These parts include the structures, systems, and components whose satisfactory performance is required for the plant to operate reliably, to prevent accidents that cause undue risk to the health and safety of the public, or to mitigate the consequences of such accidents if they were to occur. Housekeeping encompasses all activities related to control of cleanness of facilities, cleanness of material and equipment, fire prevention and fire protection including disposal of combustible materials and debris, control of access, and protection of equipment not denoted in other Standards

  8. Engineering and training simulators: A combined approach for nuclear plant construction projects

    International Nuclear Information System (INIS)

    Harnois, Olivier; Gain, Pascal; Bartak, Jan; Gathmann, Ralf

    2007-01-01

    Full text: Simulation technologies have always been widely used on nuclear applications, but with a clear division between engineering application, using highly validated code run in batch mode, and training purpose where real time computation is a mandatory requirement. Thanks to the flexibility of modern simulation technology and the increased performance of computers, it becomes now possible to develop Nuclear Power plant simulators that can be used both for engineering and training purposes. In the last years, the revival of nuclear industry raised a number of new construction or plant finishing projects in which the application of this combined approach would result in decisive improvement on plant construction lead times, better project control and cost optimizations. The simulator development is to be executed in a step-wise approach, scheduled in parallel with the plant design and construction phases. During a first step, the simulator will model the plant nuclear island systems plus the corresponding instrumentation and control, specific malfunctions and local commands. It can then be used for engineering activities defining and validating the plant operating strategies in case of incidents or accidents. The Simulator executive Station and Operator Station will be in prototype version with an interface imagery enabling monitoring and control of the simulator. Availability of such simulation platform leads to a significant increase in efficiency of the engineering works, the possibility to validate basic design hypotheses and detect defects and conflicts early. The second phase will consist in the fully detailed simulation of Main Control Room plant supervision and control MMI, taking into account I and C control loops detailed design improvement, while having sufficient fidelity in order to be suitable for the future operator training. Its use will enable the engineering units not only to specify and validate normal, incident and accident detailed plant

  9. Authorization procedure for the construction and operation of nuclear installations within the EC Member States, including supervision and control

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Didier, J.M.

    1978-01-01

    This report is an updating of the report EUR 5284, Authorization procedure for the construction and operation of nuclear installations within the EEC Member States, prepared in 1974 by J.M. Didier and Associates. Recent developments regarding the authorization procedure for the construction and operation of nuclear installations have taken place in Italy (introduction of a site approval procedure) and in Denmark (adoption of an overall legislation on the subject, however not yet in force). With respect to supervision and control of nuclear installations during construction and operation, competences of, as well as their exercise by, supervisory authorities in all EC Member States, with the exception of Ireland, are also analysed in the current study

  10. A Study on the Construct Validity of Safety Culture Oversight Model for Nuclear Power Operating Organization

    International Nuclear Information System (INIS)

    Jung, Su Jin; Choi, Young Sung; Oh, Jang Jin

    2015-01-01

    In Korea, the safety policy statement declared in 1994 by government stressed the importance of safety culture and licensees were encouraged to manage and conduct their self-assessments. A change in regulatory position about safety culture oversight was made after the event of SBO cover-up in Kori unit 1 and several subsequent falsification events. Since then KINS has been developing licensee's safety culture oversight system including conceptual framework of oversight, prime focus area for oversight, and specific details on regulatory expectations, all of which are based on defence-in-depth (DiD) safety enhancement approach. Development and gathering of performance data which is related to actual 'safety' of nuclear power plant are needed to identify the relationship between safety culture and safety performance. Authors consider this study as pilot which has a contribution on verifying the construct validity of the model and the effectiveness of survey based research. This is the first attempt that the validity of safety culture oversight model has been investigated with empirical data obtained from Korean nuclear power operating organization

  11. Construction of a bibliographic information database for the Nuclear Science and Engineering (IX)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Oh, Jeong Hun; Choi, Kwang; Keum, Jong Yong [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows: 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this seventh year, 40,000 records, as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the the effectiveness of R and D activities, but also to obviate the duplicated research works. 1 fig., 1 tab. (Author)

  12. Construction of a bibliographic information database for the nuclear science and engineering (VIII)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Kim, Soon Ja; Kim, Young Min; Oh, Jeong Hun; Choi, Kwang [Korea Atomic Energy Research Institute, Taejon (Korea)

    1998-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science ad Technology Access Line)'s BD through the KREONet (Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows : 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this seventh year, 35,000 record as total of inputted data, are added to the existing SATURN DB using the input system. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. 1 tab. (Author)

  13. Construction of a bibliographic information database for the nuclear science and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Kim, Soon Ja; Choi, Kwang [Korea Atomic Energy Reasech Institute, Taejon (Korea)

    1997-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows: (1) Materials selection and collection, (2) Indexing and abstract preparation, (3) Data input and transmission, and (4) document delivery service. In this seventh year, 45000 records, as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. (author). 1 fig., 1 tab.

  14. Construction of a bibliographic information database for the nuclear science and engineering (X)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Lee, Ji Ho; Oh, Jeong Hun; Choi, Kwang; Chun, Young Chun; Yoo, Jae Bok; Yu, Anna [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks.The contents of this project are as follows: 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this Tenth year, 30,500 records ,as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information . And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. 2 tabs. (Author)

  15. Westinghouse experience over the past 10 years in negotiating and constructing nuclear power plants

    International Nuclear Information System (INIS)

    Richards, D.E.

    1979-01-01

    Reason for delays in delivery times for nuclear plant are discussed in the light of Westinghouse experience. Today the lead time for the construction of the plant is no longer dictated by the lead time of the nuclear steam supply system. The increased complexity of contract negotiations and of standards and specifications contributes to the delays. Site work is constantly subject to delays due to various labour problems. The main delays stem from regulatory authorities, environmentalists and political considerations. Lateness on the plant causes problems of warranty, storage of equipment and of finance. Westinghouse procedures for alleviating delays during erection are outlined. As the start-up schedule dictates erection, purchasing and design, it should be established as early as possible. A typical overall schedule for a PWR is outlined. It is concluded that completion of plant within schedule requires decisions on basic principles and sufficient detailed planning and organisational structures to be established before the start of the project followed by strong project management. The discussion following the conference is also recorded. (U.K.)

  16. A Study on the Construct Validity of Safety Culture Oversight Model for Nuclear Power Operating Organization

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Su Jin; Choi, Young Sung; Oh, Jang Jin [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2015-05-15

    In Korea, the safety policy statement declared in 1994 by government stressed the importance of safety culture and licensees were encouraged to manage and conduct their self-assessments. A change in regulatory position about safety culture oversight was made after the event of SBO cover-up in Kori unit 1 and several subsequent falsification events. Since then KINS has been developing licensee's safety culture oversight system including conceptual framework of oversight, prime focus area for oversight, and specific details on regulatory expectations, all of which are based on defence-in-depth (DiD) safety enhancement approach. Development and gathering of performance data which is related to actual 'safety' of nuclear power plant are needed to identify the relationship between safety culture and safety performance. Authors consider this study as pilot which has a contribution on verifying the construct validity of the model and the effectiveness of survey based research. This is the first attempt that the validity of safety culture oversight model has been investigated with empirical data obtained from Korean nuclear power operating organization.

  17. The construction of social identity in newly recruited nuclear engineering staff: A longitudinal study

    International Nuclear Information System (INIS)

    Nguyen, Lynda; Murphy, Glen; Chang, Artemis

    2014-01-01

    This study examines the process by which newly recruited nuclear engineering and technical staff came to understand, define, think, feel and behave within a distinct group that has a direct contribution to the organization's overall emphasis on a culture of reliability and system safety. In the field of organizational behavior the interactive model of social identity formation has been recently proposed to explain the process by which the internalization of shared norms and values occurs, an element critical in identity formation. Using this rich model of organizational behavior we analyzed multiple sources of data from nine new hires over a period of three years. This was done from the time they were employed to investigate the construction of social identity by new entrants entering into a complex organizational setting reflected in the context of a nuclear facility. Informed by our data analyses, we found support for the interactive model of social identity development and report the unexpected finding that a newly appointed member's age and level of experience appears to influence the manner in which they adapt, and assimilate into their surroundings. This study represents an important contribution to the safety and reliability literature as it provides a rich insight into the way newly recruited employees enact the process by which their identities are formed and hence act, particularly under conditions of duress or significant organizational disruption in complex organizational settings. - Highlights: • We examined how newly recruited nuclear engineer staff develop their social identity. • The study empirically examined the interactive model of social identity formation. • Innovative research strategies were used to capture rich primary data for all case studies. • Age and experience moderated internalization route and the social identity formation process

  18. Approaches to assessment of socio-demographic and economic aspects of nuclear power plant construction and operation

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    The paper informs of solving the task of economic evaluation of transient and permanent social consequences of the construction and operation of nuclear power plants. The solution takes place in three stages: 1. drafting of methodology, 2. trial of methodology in localities of current nuclear power plant construction, 3. analysis of results and finalizing of methodology. The task is aimed at studying the questions of the return and profitability of investments, the evaluation of optimal economic lifetime, and the effective restoration of basic funds. Its model solution shows the national economy relations of nuclear power. Also discussed is the question of the use of non-balance heat from nuclear power plants. (E.S.)

  19. Construction of scales to measure leadership behavior at nuclear power plants. 2

    Energy Technology Data Exchange (ETDEWEB)

    Misumi, Jyuji; Yamada, Akira [Institute of Nuclear Safety System Inc., Kyoto (Japan); Shinohara, Shinobu [and others

    1994-05-01

    We tried to construct the PM leadership behavior measuring scales at nuclear power plants. In our factor analysis of leadership types of shift supervisors, maintenance and repair subsection chiefs and sub contractors` field leaders, three factors respectively were found. In the leadership scales for shift supervisors, the first factor was named the factor of group maintenance, the second factor was named the factor of directive-order for goal achievement and the third factor was named the factor of specialty for goal achievement. For maintenance and repair subsection chiefs, the first factor was named the factor of directive-order for goal achievement, and second factor was named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for goal achievement. For subcontractors` leaders, the first factor was named the factor of directive-specialty for goal achievement, the second factor named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for achievement. We constructed PM leadership measuring scales for each advisory position and verified its validity by using workplace `morale`-(satisfaction, etc.) as a subordinate variable. Also, in regard to the distribution of scales, we verified the validity of distance scales by examining it by Quantification III. (author)

  20. Construction of scales to measure leadership behavior at nuclear power plants. 2

    International Nuclear Information System (INIS)

    Misumi, Jyuji; Yamada, Akira; Shinohara, Shinobu

    1994-01-01

    We tried to construct the PM leadership behavior measuring scales at nuclear power plants. In our factor analysis of leadership types of shift supervisors, maintenance and repair subsection chiefs and sub contractors' field leaders, three factors respectively were found. In the leadership scales for shift supervisors, the first factor was named the factor of group maintenance, the second factor was named the factor of directive-order for goal achievement and the third factor was named the factor of specialty for goal achievement. For maintenance and repair subsection chiefs, the first factor was named the factor of directive-order for goal achievement, and second factor was named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for goal achievement. For subcontractors' leaders, the first factor was named the factor of directive-specialty for goal achievement, the second factor named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for achievement. We constructed PM leadership measuring scales for each advisory position and verified its validity by using workplace 'morale'-(satisfaction, etc.) as a subordinate variable. Also, in regard to the distribution of scales, we verified the validity of distance scales by examining it by Quantification III. (author)

  1. Construction of a male sterility system for hybrid rice breeding and seed production using a nuclear male sterility gene

    OpenAIRE

    Chang, Zhenyi; Chen, Zhufeng; Wang, Na; Xie, Gang; Lu, Jiawei; Yan, Wei; Zhou, Junli; Tang, Xiaoyan; Deng, Xing Wang

    2016-01-01

    Nuclear male sterility is common in flowering plants, but its application in hybrid breeding and seed production is limited because of the inability to propagate a pure male sterile line for commercial hybrid seed production. Here, we characterized a rice nuclear gene essential for sporophytic male fertility and constructed a male sterility system that can propagate the pure male sterile seeds on a large scale. This system is fundamentally advantageous over the current cytoplasmic male steril...

  2. Delay consequencies in the construction time-schedule of nuclear power plants in relation to its safety and quality

    International Nuclear Information System (INIS)

    Recalde, J.A.

    1991-01-01

    An important delay in the construction time-schedule of a Nuclear Power Plant affects its safety and quality. This mainly occurs as a consequence of four reasons: discontinuity of the personnel working for the project; discontinuities of project suppliers; new safety and quality concepts; long-term storage. This work analyses each of the above reasons so as to foresee countermeasures to garantee the non deterioration of a Nuclear Power Plant. (author)

  3. RCC-CW - Rules for design and construction of PWR nuclear civil works

    International Nuclear Information System (INIS)

    2016-01-01

    RCC-CW describes the rules for designing, building and testing civil engineering works in PWR reactors. It explains the principles and requirements for the safety, serviceability and durability of concrete and metal frame structures, based on Eurocode design principles (European standards for the structural design of construction works) combined with specific measures for safety-class buildings. The code is produced as part of the RCC-CW Subcommittee, which includes all the parties involved in civil engineering works in the nuclear sector: clients, contractors, general and specialized firms, consultancies and inspection offices. The code covers the following areas relating to the design and construction of civil engineering works that play an important safety role: geotechnical aspects, reinforced concrete structures and galleries, pre-stressed containments with metal liner, metal containment and pool liners, metal frames, anchors, concrete cylinder pipes, containment leak tests. The RCC-CW code is available as an ETC-C version specific to EPR projects (European pressurized reactor). Contents of the 2016 edition of the RCC-CW Code: Part G - General: scope, standards, notations, quality management, general principles; Part D - Design: actions and combinations of actions, geotechnical aspects, pre-stressed or reinforced concrete structures, metal containment liners, metal pool liners, metal frames, anchors; Part C - Construction: geotechnical aspects, concrete, surface finish and formwork, reinforcement for reinforced concrete, pre-stressing processes, prefabricated concrete elements, metal containment liners, metal pool liners, metal frames, anchors, embedded pipelines, joint sealing, survey networks and tolerances; Part M - Maintenance and monitoring: containment integrity and rate tests

  4. Quality assurance of civil works during the construction of a nuclear power plant in Germany, F.R

    International Nuclear Information System (INIS)

    Hillemeier, B.

    1980-01-01

    During the construction of Nuclear Power Plants in Germany extended system-oriented steps will have to be mentioned, which the 'Kerntechnischer Ausschuss' has gathered up in his KTA-rules. The lecture outlines the organization and the performance of QA-requirements which are the common and lawful basis for the construction in Germany. The organizational structure and the functional responsability assignments at HOCHTIEF, one of the leading European contractors, will be represented. At last the QA-procedures will be described for a Nuclear Power Plant under erection. (orig.)

  5. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-01-01

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups

  6. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    Energy Technology Data Exchange (ETDEWEB)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-11-26

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups.

  7. Concrete containments in Swedish nuclear power plants. A review of construction and material

    International Nuclear Information System (INIS)

    Roth, Thomas; Silfwerbrand, Johan; Sundquist, Haakan

    2002-12-01

    The purpose of project is the long-term accumulation of knowledge related to the status of existing structures in order to facilitate answers to questions that may arise in the future. We have visited all the power stations in Sweden and in conjunction with these visits we have gone through all the relevant documents relating to the constructional concrete. An assessment of the structural integrity, related to the question of cracking and hence seepage, has been conducted. Currently, the work has only been done on a random sampling basis as in many cases important information is still missing. Generally, it can be said that the relevant constructions are, from a structural integrity point-of-view, correctly designed and detailed and have very high safety margins for the load cases which constitute the functional demands placed upon the installation. Each containment structure (vessel) appears to have been designed and built using the best available knowledge at the time of construction. It may be of interest to note that when these structures were built there was a very high level of competence and experience of how to design, detail, and construct large concrete structures. The cement used for the majority of these large concrete structures forming nuclear power stations, namely a slowly hardening cement (LH cement), had very good properties, perhaps even better than those available today. Later structures were built with other cements and concrete mixes, although this has been partly compensated for by a choice of a higher nominal quality. The environment is favourable regarding potential degradation of the concrete, the reinforcement steel and the steel liner. Questions remain regarding the uncertainties of the methods used for continuous inspection of the cement injected prestressing steel. This is even the case for possibly insufficient injection around grouting mounting parts for manholes and other openings. Assessment of prestressing losses may also require

  8. Financing aspects of nuclear power plant construction under Polish economic conditions

    International Nuclear Information System (INIS)

    Besant-Jones, John E.

    1999-01-01

    Within the framework of the new Polish Energy Law the different issues important far financing a programme to develop nuclear power power in Poland such as: economic competitiveness of nuclear power, financing options for nuclear power projects, managing the various risks for financing nuclear power as well as nuclear and business liability are considered. The importance of policy issues is stressed

  9. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  10. Security during the Construction of New Nuclear Power Plants: Technical Basis for Access Authorization and Fitness-For-Duty Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Branch, Kristi M.; Baker, Kathryn A.

    2009-09-01

    A technical letter report to the NRC summarizing the findings of a benchmarking study, literature review, and workshop with experts on current industry standards and expert judgments about needs for security during the construction phase of critical infrastructure facilities in the post-September 11 U.S. context, with a special focus on the construction phase of nuclear power plants and personnel security measures.

  11. Construction works of large scale impervious wall in construction of No.2 plant in Onagawa Nuclear Power Station, Tohoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Ueda, Kozaburo; Sugeno, Yoshisada; Takahashi, Hitoshi

    1991-01-01

    The main buildings for No. 2 plant in Onagawa Nuclear Power Station are constructed on the bedrocks about 14 m below the sea surface. Therefore, for the purpose of executing the works by shutting seawater off and dry work, the large scale impervious wall of about 500 m extension was installed underground. The feature of this impervious wall is the depth of embedment of about 3 m into the hard bedrocks having the uniaxial compressive strength of 2000 kg/cm 2 at maximum, carried out with the newly developed hard rock excavator. The outline of these construction works is reported. No. 2 plant in Onagawa Nuclear Power Station is the BWR plant of 825 MWe output. The construction works of the power station were began in August, 1989, and the rate of progress in civil engineering works as of the end of September, 1990 was 21.3%. The planning of the impervious wall, the geological features at the site, the method of shutting seawater off, the selection of wall materials, the design of the wall body, the investigation of the quantity of spring water, the execution of the construction and execution management, and the confirmation of the effect of the wall are reported. (K.I.)

  12. Fire protection requirements of the insurance industry and their impact on nuclear power plant design and construction

    International Nuclear Information System (INIS)

    Deitchman, J.V.; King, W.T. Jr.; Nashman, T.A.

    1976-01-01

    The insurance industry, with its wealth of knowledge and experience in the fire protection area and with preservation of its funds at stake, has always been heavily involved in the fire protection programs of nuclear power plants. Since it was concerned with property preservation in addition to nuclear safety, the insurance industry placed more detailed emphasis on fire protection requirements than did the nuclear regulatory bodies. Since the Browns Ferry fire, however, the insurance industry, the Nuclear Regulatory Commission, the Advisory Committee on Reactor Safeguards and the utilities themselves have re-examined their approaches to fire protection. A more coordinated approach seems to have emerged, which is based largely upon insurance industry specifications and guidelines. The paper briefly summarizes the fire protection requirements of the insurance industry as they apply to nuclear power plants. Some of the ways these requirements affect project planning, plant design, and construction timing are reviewed, as well as some of the more controversial fire protection areas

  13. NET IBK Computer code package for the needs of planning, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Matausek, M V; Kocic, A; Marinkovic, N; Milosevic, M; Stancic, V [Boris Kidric Institute of nuclear sciences Vinca, Belgrade (Yugoslavia)

    1978-07-01

    Within the Nuclear Engineering Laboratory of the Boris Kidric Institute of Nuclear Sciences (NET IBK) a systematic work has been performed on collecting nuclear data for reactor calculation needs, on developing own methods and computing programs for reactor calculations, as well as on adapting and applying the foreign methods and codes. In this way a complete library of computer programs was formed for precise prediction of nuclear fuel burnup and depletion, for evaluation of the Power distribution variations with irradiation, for computing the amount of produced plutonium and its number densities etc. Programs for evaluation of location of different types of safety and economic analysis have been developed as well. The aim of this paper is to present our abilities to perform complex computations needed for planning, constructing and operating the nuclear power plants, by describing the NET IBK computer programs package. (author)

  14. Construction of a bibliographic information database and development of retrieval system for research reports in nuclear science and technology (II)

    International Nuclear Information System (INIS)

    Han, Duk Haeng; Kim, Tae Whan; Choi, Kwang; Yoo, An Na; Keum, Jong Yong; Kim, In Kwon

    1996-05-01

    The major goal of this project is to construct a bibliographic information database in nuclear engineering and to develop a prototype retrieval system. To give an easy access to microfiche research report, this project has accomplished the construction of microfiche research reports database and the development of retrieval system. The results of the project are as follows; 1. Microfiche research reports database was constructed by downloading from DOE Energy, NTIS, INIS. 2. The retrieval system was developed in host and web version using access point such as title, abstracts, keyword, report number. 6 tabs., 8 figs., 11 refs. (Author) .new

  15. Construction of a bibliographic information database and development of retrieval system for research reports in nuclear science and technology (II)

    Energy Technology Data Exchange (ETDEWEB)

    Han, Duk Haeng; Kim, Tae Whan; Choi, Kwang; Yoo, An Na; Keum, Jong Yong; Kim, In Kwon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-05-01

    The major goal of this project is to construct a bibliographic information database in nuclear engineering and to develop a prototype retrieval system. To give an easy access to microfiche research report, this project has accomplished the construction of microfiche research reports database and the development of retrieval system. The results of the project are as follows; 1. Microfiche research reports database was constructed by downloading from DOE Energy, NTIS, INIS. 2. The retrieval system was developed in host and web version using access point such as title, abstracts, keyword, report number. 6 tabs., 8 figs., 11 refs. (Author) .new.

  16. Improving quality and the assurance of quality in the design and construction of nuclear power plants: a report to Congress

    International Nuclear Information System (INIS)

    Altman, W.; Ankrum, T.; Brach, W.

    1984-05-01

    A study was conducted of existing and alternative programs for improving quality and the assurance of quality in the design and construction of commercial nuclear power plants. A primary focus of the study was to determine the underlying causes of major quality-related problems in the construction of some nuclear power plants and the untimely detection and correction of these problems. The study concluded that the root cause for major quality-related problems was the failure or inability of some utility managements to effectively implement a management system that ensured adequate control over all aspects of the project. These management shortcoming arose in part from inexperience on the part of some project teams in the construction of nuclear power plants. NRC's past licensing and inspection practices did not adequately screen construction permit applicants for overall capability to manage or provide effective management oversight over the construction project. The study recommends a number of improvements in industry and NRC programs. For industry, the study recommends self-imposed rising standards of excellence, treatment of quality assurance as a management tool, not a substitute for management, improved trend analysis and identification of root causes of quality problems, and a program of comprehensive third party audits of present and future construction projects. To improve NRC programs, the study recommends a heavier emphasis on team inspections and resident inspectors, an enhanced review of new applicant's capabilities to construct commercial nuclear power plants, more attention to management issues, improved diagnostic and trending capabilities, improved quality and quality assurance for operating reactors, and development of guidance to facilitate the prioritization of quality assurance measures commensurate with the importance of plant structures, systems, and components to the achievement of safety

  17. Structural response of nuclear containment shield buildings with unanticipated construction openings

    Science.gov (United States)

    Mac Namara, Sinead Caitriona

    As Nuclear Power Plants age many require steam generator replacement. There is a nickel alloy in the steam generator tubes that is susceptible to stress cracking and although these cracks can be sealed the generator becomes uneconomical without 10%-15% of the tubes. The steam generator in a typical nuclear power plant is housed in the containment structure next to the reactor. The equipment hatch is not big enough to facilitate steam generator replacement, thus construction openings in the dome of the containment structure are required. To date the structural consequences of construction openings in the dome have not been examined. This thesis examines the effects of such openings. The prototype concrete dome is made up of a 2 ft thick dome atop 3 ft thick and 170 ft high cylindrical walls (radius 65.5 ft) with a tension ring 15 ft high and 8 ft thick in between. The dome of the building is cast in two layers; a lower 9 inch layer that serves as the formwork for an upper 15 inch layer. The weight of the dome is carried in axial compression along the hoops and meridians of the dome. The first finite element model uses shell elements and considers two limiting load cases; where the two layers act as one, and where the lower layer carries the weight of both. The openings interrupt the hoops and meridians and the weight of the dome must be redistributed around the openings. Without openings, the stresses due to dead load in the structure are very low when compared to the material strength. The impact of the openings is increased compression stresses near the opening. The maximum stresses are approximately four times larger than in the original structure. These results are confirmed by the second model which is made from layers of solid elements. This model shows a significant difference between the compression on the top surface of the dome, in the affected areas, and that on the bottom surface, leading to shear stresses. These shear stresses are largest around the

  18. The effect of economic growth, oil prices, and the benefits of reactor standardization: Duration of nuclear power plant construction revisited

    International Nuclear Information System (INIS)

    Csereklyei, Zsuzsanna; Thurner, Paul W.; Bauer, Alexander; Küchenhoff, Helmut

    2016-01-01

    The profitability of nuclear power plant investment is largely determined by the construction duration, which directly impacts discounted cash flows, debt and interest payments, as well as variable costs, such as labor. This paper analyzes the key drivers of construction duration using survival models. We focus especially on the strategic expectation formation of private and public utilities engaging in such highly risky megaprojects. Using a balanced dataset of explanatory variables and the IAEA/PRIS dataset of reactor construction starts between 1950 and 2013 we find that the expectation of rising oil prices and higher economic growth, along with the higher per capita GDP of a country tend to reduce the time needed to grid connection. We also identify the reactor models with the fastest construction duration. - Highlights: • We find that higher future economic growth speeds up nuclear reactor construction. • Higher national capacity (measured by income per capita) results in faster projects. • Higher oil prices during construction lead to faster construction times. • Reactor standardization may result in faster building times.

  19. Current construction status of Korea Wolsong Nuclear Environment Management Center (low and intermediate level radioactive waste disposal facility)

    International Nuclear Information System (INIS)

    Suzuki, Yasuo

    2010-01-01

    Through the RANDEC delegation tour to Korea in Nov. 2009, we have earned new information on recent development of the radioactive waste management in Korea. In this report, we will introduce such development in Korea, focusing on the current construction status of Korean LILW (low and intermediate level radioactive waste) disposal site, now called, Wolsong Nuclear Environment Management Center. (author)

  20. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung

    2014-01-01

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently

  1. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2014-05-15

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently.

  2. From Streams to Lumps: Transforming Long-Term Incentives into Up-Front Financing for New Nuclear Construction

    International Nuclear Information System (INIS)

    George, Glenn R.

    2006-01-01

    The Energy Policy Act of 2005 is an important development in the financing of new nuclear capacity in the near- to mid-term in the U.S.A. Key features of the Act, including production tax credits, loan guarantees, funding support, and 'standby support', are intended to provide significant incentives for new nuclear development, construction, and operation. There is a mismatch, however, between the nature and extent of incentives being offered and what is needed to spur nuclear plant deployment in light of power market uncertainty, utility investor wariness, and the need to raise significant capital before a nuclear construction project can be launched. In this paper, the author addresses these issues through the lens of financial tools and techniques. The paper considers various ways in which long-term streams of subsidies can be transformed into up-front financing for new nuclear capacity. Securing and related financial structures are among the mechanisms considered for potentially bridging the temporal gap between flows of financial benefits conferred legislatively and lumps of capital required by developers and investors in advance of a construction program. (authors)

  3. RCC-E: Design and construction rules for electrical equipment of PWR nuclear islands

    International Nuclear Information System (INIS)

    2016-01-01

    RCC-E describes the rules for designing, building and installing electrical and I and C systems and equipment for pressurized water reactors. The code was drafted in partnership with industry, engineering firms, manufacturers, building control firms and operators, and represents a collection of best practices in accordance with IAEA requirements and IEC standards. The code's scope covers: architecture and the associated systems, materials engineering and the qualification procedure for normal and accidental environmental conditions, facility engineering and management of common cause failures (electrical and I and C) and electromagnetic interference, testing and inspecting electrical characteristics, quality assurance requirements supplementing ISO 9001 and activity monitoring. Use: RCC-E has been used to build the following power plants: France's last 12 nuclear units (1,300 MWe (8) and 1,450 MWe (4)), 2 M310 reactors in Korea (2), 44 M310 (4), CPR-1000 (28), CPR-600 (6), HPR-1000 (4) and EPR (2) reactors in service or undergoing construction in China, 1 EPR reactor in France. RCC-E is used for maintenance operations in French power plants (58 units) and Chinese M310 and CPR-1000 power plants. RCC-E has been chosen for the construction of the EPR plants in Hinkley Point, UK. Contents of the 2016 edition of the RCC-E code: Volume 1 - General requirements and quality assurance; Volume 2 - Specification of requirements; Volume 3 - I and C systems; Volume 4 - Electrical systems; Volume 5 - Materials engineering; Volume 6 - Installation of electrical and I and C systems; Volume 7 - Inspection and test methods

  4. Economic and ecological assessment of impact of construction and operation of nuclear power plant as large capital construction project with respect to control of national economy development

    International Nuclear Information System (INIS)

    Bucek, M.

    1984-01-01

    The evaluation of costs and environmental impacts of the construction and operation of nuclear power plants is concentrated into two problem areas: 1. the calculation of capital and operation costs for the prevention and minimization of envirommental damage and restoration of the environment, 2. the calculation of damage to the environment of nuclear power plant construction and operation. The ecological cost benefit of capital costs is assessed. In Czechoslovakia there does not exist any method for converting cost effectiveness of investments into environmental protection. This problem is incorporated in the general method of assessing capital cost benefit. The relations are given for total socio-economic capital cost benefit and cost benefit of investments into environmental protection. Ecological investment is not exempted from the investment fund and from the point of view of content may be devided into net and gross ecological investment and from the point of view of time into preventive and compensation ecological investment. In the USSR the method has beem developed of the ecological and economic evaluation of projects for the construction and reconstruction of production units which proceeds from the evaluation of the negative environmental impact of wastes. The basic relations are given of the benefit of ecological investments. (E.S.)

  5. Prediction of concrete compressive strength considering humidity and temperature in the construction of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Seung Hee; Jang, Kyung Pil [Department of Civil and Environmental Engineering, Myongji University, Yongin (Korea, Republic of); Bang, Jin-Wook [Department of Civil Engineering, Chungnam National University, Daejeon (Korea, Republic of); Lee, Jang Hwa [Structural Engineering Research Division, Korea Institute of Construction Technology (Korea, Republic of); Kim, Yun Yong, E-mail: yunkim@cnu.ac.kr [Structural Engineering Research Division, Korea Institute of Construction Technology (Korea, Republic of)

    2014-08-15

    Highlights: • Compressive strength tests for three concrete mixes were performed. • The parameters of the humidity-adjusted maturity function were determined. • Strength can be predicted considering temperature and relative humidity. - Abstract: This study proposes a method for predicting compressive strength developments in the early ages of concretes used in the construction of nuclear power plants. Three representative mixes with strengths of 6000 psi (41.4 MPa), 4500 psi (31.0 MPa), and 4000 psi (27.6 MPa) were selected and tested under various curing conditions; the temperature ranged from 10 to 40 °C, and the relative humidity from 40 to 100%. In order to consider not only the effect of the temperature but also that of humidity, an existing model, i.e. the humidity-adjusted maturity function, was adopted and the parameters used in the function were determined from the test results. A series of tests were also performed in the curing condition of a variable temperature and constant humidity, and a comparison between the measured and predicted strengths were made for the verification.

  6. The WEST project mechanical analysis of the divertor structure according to the nuclear construction code

    Energy Technology Data Exchange (ETDEWEB)

    Larroque, S., E-mail: sebastien.larroque@cea.fr [CEA Cadarache, IRFM, F-13108 Saint-Paul-lez-Durance (France); Portafaix, C. [ITER Organization, 13108 Saint-Paul-lez-Durance (France); Saille, A.; Doceul, L.; Bucalossi, J.; Samaille, F.; Freslon, S. de [CEA Cadarache, IRFM, F-13108 Saint-Paul-lez-Durance (France)

    2014-10-15

    Highlights: • Divertor structure is mainly loaded by electromagnetical forces. • A simplified FEM analysis give the stresses in the structure. • RCCM criteria are required for the sizing. • Refined finite element models are used for local overstresses. - Abstract: The Tore Supra tokamak is being transformed in an x-point divertor fusion device in the frame of the WEST project, launched in support to the ITER tungsten divertor strategy. The installation of coils inside the vacuum vessel led to the design of a divertor supporting platform able to meet the project requirements and the associated electromagnetic loads. This paper illustrates the design, the method and the results of the thermomechanical elastic stress analyses performed in 2012. The validation of the integrity of the structure is based on the compliance with RCCMR design criteria (even though these Design and Construction rules for Mechanical Components of nuclear installations are not required for such experimental fusion device). Several 3D analyses are performed with the ANSYS code. The major one is a global analysis of half structure which determinates the stresses in the main part of the components. It gives an idea of the areas which needs local analyses. It also provides the interface loads for junction studies or simplified local model.

  7. Construction strategies and lifetime uncertainties for nuclear projects: A real option analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jain, Shashi, E-mail: s.jain@cwi.nl [TU Delft, Delft Institute of Applied Mathematics, Delft (Netherlands); Nuclear Research Group, Petten (Netherlands); Roelofs, Ferry, E-mail: roelofs@nrg.eu [Nuclear Research Group, Petten (Netherlands); Oosterlee, Cornelis W., E-mail: c.w.oosterlee@cwi.nl [CWI – Centrum Wiskunde and Informatica, Amsterdam (Netherlands); TU Delft, Delft Institute of Applied Mathematics, Delft (Netherlands)

    2013-12-15

    Highlights: • Real options can be used to value flexibility of modular reactors. • Value of NPPs increases with implementation of long term cost reductions. • Levels of uncertainties affect the choice between projects. -- Abstract: Small and medium sized reactors, SMRs (according to IAEA, ‘small’ are reactors with power less than 300 MWe, and ‘medium’ with power less than 700 MWe) are considered as an attractive option for investment in nuclear power plants. SMRs may benefit from flexibility of investment, reduced upfront expenditure, and easy integration with small sized grids. Large reactors on the other hand have been an attractive option due to economy of scale. In this paper we focus on the advantages of flexibility due to modular construction of SMRs. Using real option analysis (ROA) we help a utility determine the value of sequential modular SMRs. Numerical results under different considerations, like possibility of rare events, learning, uncertain lifetimes are reported for a single large unit and modular SMRs.

  8. Nondestructive examinations performance demonstration standpoint of the BCCN (Nuclear Construction Inspection Office)

    International Nuclear Information System (INIS)

    Deschamps, J.; Novat, J.

    1994-01-01

    The part played by in service non-destructive examinations (NDE) in the safety assessment of French nuclear power plants has developed considerably since startup of the first PWR unit 15 years ago. In 15 years of operation and continued plant construction, defects came to light, revealed either by a non-destructive examination or a leak occurring in operation or during hydrostatic test. It is consequently necessary to operate reactors affected by defects already detected or liable to develop according to a known mechanism. This practice is only acceptable if it can be proved that the defects will remain harmless in all situations. This implies that they can be detected without fail beyond a certain threshold, that they can be characterized and that their propensity to develop can be measured. In some cases, only NDE data can justify the continued operation of a reactor. Maximum guarantees as to the performances and reliability of these examinations are consequently indispensable, since plant safety conclusions will be based on their results. This paper discusses: the advantages of an NDE performance demonstration program; practical assessments role; and NDE performance demonstration stages

  9. Industrial hygiene survey report of Millstone Nuclear Power Station No. 3 construction site, Waterford, Connecticut

    International Nuclear Information System (INIS)

    Zaebst, D.D.; Herrick, R.

    1985-11-01

    Personal and area air samples were analyzed for total dust, organic solvent vapors, and metals during spray, brush, and roller painting and paint removal operations at Millstone Nuclear Power Station Number 3 construction site, Waterford, Connecticut, March 1981. Solvent exposures were generally well below their relevant standards. Total dust exposures during paint removal ranged up to 1,000 milligrams per cubic meter (mg/m3) in the containment building. The OSHA standard for total dust is 15mg/m3. Exposures to lead dusts exceeded the OSHA standard of 0.05mg/m3 in the turbine, auxiliary, and containment buildings. Chromium exposures were generally below the OSHA standard of 1mg/m3, except for 2.4mg/m3 in a personal sample taken during paint removal in the containment building. Very few engineering controls other than 3M single use respirators were observed. The authors note that the chromium exposure data is difficult to interpret as the form of the chromium is not known. If the chromium existed as hexavalent chromium exposure was excessive. The authors conclude that in view of the measured exposures to total dust, lead, and chromium, engineering controls and respiratory protection are inadequate. Recommendations include implementing better controls and respiratory protection

  10. Construction strategies and lifetime uncertainties for nuclear projects: A real option analysis

    International Nuclear Information System (INIS)

    Jain, Shashi; Roelofs, Ferry; Oosterlee, Cornelis W.

    2013-01-01

    Highlights: • Real options can be used to value flexibility of modular reactors. • Value of NPPs increases with implementation of long term cost reductions. • Levels of uncertainties affect the choice between projects. -- Abstract: Small and medium sized reactors, SMRs (according to IAEA, ‘small’ are reactors with power less than 300 MWe, and ‘medium’ with power less than 700 MWe) are considered as an attractive option for investment in nuclear power plants. SMRs may benefit from flexibility of investment, reduced upfront expenditure, and easy integration with small sized grids. Large reactors on the other hand have been an attractive option due to economy of scale. In this paper we focus on the advantages of flexibility due to modular construction of SMRs. Using real option analysis (ROA) we help a utility determine the value of sequential modular SMRs. Numerical results under different considerations, like possibility of rare events, learning, uncertain lifetimes are reported for a single large unit and modular SMRs

  11. JHR. A high performance MTR under construction for a sustainable nuclear energy

    International Nuclear Information System (INIS)

    Iracane, Daniel; Cordier, Pierre-Yves

    2009-01-01

    The Access to an up-to-date Material Testing Reactor (MTR) is essential to support a sustainable nuclear energy, meeting industry and public needs, and keeping a high level of scientific expertise. This includes services to existing and coming reactor technologies for major stakes such as safety and competitiveness, lifetime management, operation optimization, development of innovative structural material and fuel required for future systems (innovative Gen III, Gen IV, fusion...), etc. The JHR copes with this context. Design phase has been completed by the end of 2005 and JHR is now under construction. Start of operation is scheduled in 2014. As a new MTR taking benefit of a large available worldwide experience, JHR offers new major experimental capability that will be presented. JHR will be operated within an international users' consortium that will guarantee effective and cost-effective operation. This innovative way to operate a MTR, as a user-facility for the benefit of industry and public bodies, will be presented. (author)

  12. The political construction of the nuclear energy issue and its impact on the mobilization of anti-nuclear movements in Western Europe

    International Nuclear Information System (INIS)

    Koopmans, R.; Duyvendak, J.W.

    1994-01-01

    This paper investigates the relation between objective conditions and grievances on the one hand, and the construction of the nuclear energy 'problem' and the mobilization of anti-nuclear movements in Western Europe, on the other. Using data on protest reactions to the Chernobyl disaster in Germany, France, the Netherlands, and Switzerland, we first discuss the effects of so-called 'suddenly imposed grievances'. We then turn to the frame alignment model, which emphasizes the importance of processes of definition and interpretation for the mobilization of social movements, and confront this model with data on public attitudes towards nuclear energy and anti-nuclear movement mobilization in Western Europe. Our analysis indicates that objective conditions as such have little explanatory power, and that similar events and conditions have led to widely diverging interpretations and levels of anti-nuclear mobilization in different countries. We find that the differential success of the interpretative efforts of anti-nuclear movements does neither depend on the nature of the discursive struggle itself, nor on the evidential base for the anti-nuclear movement's claims. Our data show that the movements' political opportunities, and the resulting cross-national variations in the degree to which anti-nuclear movements have been able to block or slow down the expansion of nuclear energy, have been crucial determinants both of the movements' impacts on public opinion, and of the movements' levels of mobilization. We therefore conclude that a combination of the political opportunity and framing perspectives is most fruitful in making sense of the differential careers of the nuclear energy conflict in Western Europe. (orig.) [de

  13. Some experimental justifications of constructions of nuclear reactors with the use of solid coolant

    International Nuclear Information System (INIS)

    Deniskin, V.; Nalivaev, V.; Fedik, I.; Vishnevski, U.; Dmitriev, A.

    2003-01-01

    Full text: The work that has been conducted so far justifies a possibility of constructing a reactor with a non-traditional coolant to develop radically new reactors and their cycles with perfect architecture. A solid coolant, for example, the carbon-based one, allows to design the primary circuit of nuclear reactor without excess pressure. Such coolant withstands temperatures up to ∼4000 deg. K without a collapse. The analysis of theory and experiments produced requirements to be met by a solid coolant used in the primary circuit of nuclear reactor. One of the most important requirements is the arrangements for a continuous and homogeneous gravity flow of the coolant through all core sections taking into account the dust caused by wear and some amount of fractured particles. Therefore, the idea is that the mass of particles should resemble a liquid to a certain extend. The particles should be sphere like with average diameter from 0.5 to 2.0 mm and nonsphericity rate not more than 10%. 'Angle of repose' of particles to the horizon can be utilised as a validity criterion of particles which should not exceed 25 deg. The heat transfer coefficient should be increased up to the practical maximum value. In 1996 - 1997 the system of experimental facilities were built in the Scientific and Research Institute 'Luch' to prove the possibility to reliably cool a nuclear reactor with a flow of solid particles and to obtain a minimum set of data for the conceptual design of such reactor with solid coolant. The facility allows the research of the flow stability, heat mass transfer in the core, lifetime wearing of particles of the solid coolant. In 1994-1999 5 batches of particles of different size were fabricated in accordance to different technologies. Four batches were graphite-based and one was aluminium oxide-based (Al 2 O 3 ). The purpose was to verify how the heat transfer coefficient was changing as the particle size varied. The average diameter of graphite particles

  14. Methodological proposal for the construction of the labor profiles of inspectors of the Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    Larcher, A.M.; Maceiras, E.; Degiovanni, G.; Perrin, C.; Sajaroff, P.

    2006-01-01

    The Argentine Nuclear Regulatory Authority (ARN) like essential part of their strategic institutional plan and in the mark of the modernization of the National Public Administration (NPA), identify the necessity to modify their functional organization, introducing the administration for processes and defining more flexible and better guided structures to the work in team. Starting from the definition of a new institutional flowchart it decided to proceed to a general reorganization of the human resources and on January, 2005 it was prepared the creation of a process whose serious objective to sit down the bases for the development of the professional career of the ARN. To such an end, it was thought about a work outline by stages, the first one of which had as final objective the elaboration of the Labor Profiles of the Institution. The work group for this first stage was integrated by a group of professionals of long trajectory in the institution and not belonging to the sector of Human Resources (RRHH). By this way it was organized as an independent group that it worked in narrow collaboration with the specific sector and informed directly to the maximum institutional direction. For the construction of the profiles a 'mixed' model was chosen that included the requirements of each position (that to make) and the competitions to complete them (how to make it), since a focus purely of competitions has not been seen as the more appropriate for the public administration and in particular for the ARN. In this work it is given to know a part of the results obtained during six months of effective work of the PerLa Group (denominated as well as an acronym of the expression Labor Profiles) putting emphasis in the defined profiles for the inspectors of those different regulatory branches that constitute the environment of competition of the RNA, this is Radiological Protection, Nuclear Safety, Safeguards and Physical Protection. The idea that underlies to the presentation

  15. Technique treatment of early stage support construction system for Gaoling mountain tunnel engineering of Daya Bay nuclear power station

    International Nuclear Information System (INIS)

    Ma Keli

    2010-01-01

    This article studies the technical treatment of primary support system used in Gaoling mountain tunnel construction process at Daya by nuclear power plant in combination with the new austrian tunneling construction method, this article first analyzes the design of primary support system, and the key point of the analyses lies in the primary support technical treatment schemes of Gaoling mountain tunnel with the examples of tunnel collapse and primary support design alteration for bias voltage section, then the construction technology of the primary support system is summarized, and the safety of wall rock is analyzed as well with the measurement data. In the end, suggestions are put forward on the design and construction of primary support system for tunnels on the basis of practical working experience. (author)

  16. Construction of scales to measure leadership behavior at nuclear power plants. 1

    Energy Technology Data Exchange (ETDEWEB)

    Misumi, Jyuji; Yamada, Akira [Institute of Nuclear Safety System Inc., Kyoto (Japan); Shinohara, Shinobu [and others

    1994-05-01

    In order to construct scales to measure leadership behavior of managers and supervisors at nuclear power plants, we prepared questionnaire covering all the leadership behaviors of leaders and then had their subordinates fill out the questionnaire. We selected questionnaire items for use in measuring leadership behaviors, analyzing the responses by means of factor analysis, etc. For the section chiefs, five factors were named, i.e., `consideration` and `self-righteousness` that belong to group maintenance behavior and `thorough dissemination of information`, `specialty, planning` and `pressure` that belong to goal achievement behavior. For the maintenance subsection chiefs were found seven factors, i.e., `example setting`, `appropriate handling of work`, `planning`, `rigidity`, `educational guidance` that belong to goal achievement behavior and `consideration for work` and `personal consideration` that belong to group maintenance behavior. For maintenance and repair foremen were named six factors, i.e., `consideration` that belongs to group maintenance behavior and `specialty, planning`, `reporting, liaison`, `adjustment, rigidity`, `paper work confirmation`, and `example setting` that belong to goal achievement behavior. For subcontractors` field leaders were named seven factors, i.e., `example setting, specialty and planning`, `careful guidance`, `rigidity`, `observance of rules` and `paper work handling` that belong to goal achievement behavior and, `consideration`, `frank communication`. In order to examine the validity of these items, we analyzed relationship between the `morale`-(satisfaction, etc.) variables of the company`s regular employees and subcontractors` employees and their leadership. It was found that the three leadership behavior scales for the section chiefs, maintenance and repair subsection chiefs and subcontractor leaders were very much the same as those found in private sector. (J.P.N.)

  17. Exploratory study of the major factors influencing craft productivity in nuclear power plant construction. Volume I

    International Nuclear Information System (INIS)

    Sebastian, S.J.; Borcherding, J.D.

    1979-05-01

    The data for this study were collected at six nuclear power plant construction sites spread throughout the United States. The geographical distribution included two projects from the Midwest and one site from each the Deep South, North Central, Southwest, and Northeast regions of the nation. The range for stage of completion varied from between approximately four and seventy-seven percent. Two of the projects were utilizing boiling water reactors (BWR) while the balance of the sites made use of the pressurized water reactor (PWR) systems. All of the installations had generating capacities approximately equal to 1200 megawatts per unit. The primary objective of the study was to provide a comprehensive investigation of the most influential factors adversely affecting craft productivity by means of a sampling comprised of five hundred seventy-six union and open shop carpenters, electricians, and pipefitters. The overall average amount of time lost due to delays obtaining materials and tools, overcrowded working conditions, interferences between crews, postponements relating to quality control inspections, and waiting for and/or receiving instructions was estimated by the tradesmen to be 24.12 manhours per individual on a weekly basis. Thus, a minimum of 60.3% of each tradesman's time is lost due to one of the aforementioned predicaments. Conversely, this figure accounts for a maximum possible level of direct work activity equal to 39.7% and is not inclusive of any personal breaks or late starts/early quits. The combined mean duration that was speculated for rework activities at all six sites totaled 5.77 manhours per craftsman per week. The summation of these two estimates yields a value of 29.89 manhours showing that only slightly more than twenty-five percent of each worker's time is allocated to productive endeavors for activities being engaged in for the first time

  18. Construction of scales to measure leadership behavior at nuclear power plants. 1

    International Nuclear Information System (INIS)

    Misumi, Jyuji; Yamada, Akira; Shinohara, Shinobu

    1994-01-01

    In order to construct scales to measure leadership behavior of managers and supervisors at nuclear power plants, we prepared questionnaire covering all the leadership behaviors of leaders and then had their subordinates fill out the questionnaire. We selected questionnaire items for use in measuring leadership behaviors, analyzing the responses by means of factor analysis, etc. For the section chiefs, five factors were named, i.e., 'consideration' and 'self-righteousness' that belong to group maintenance behavior and 'thorough dissemination of information', 'specialty, planning' and 'pressure' that belong to goal achievement behavior. For the maintenance subsection chiefs were found seven factors, i.e., 'example setting', 'appropriate handling of work', 'planning', 'rigidity', 'educational guidance' that belong to goal achievement behavior and 'consideration for work' and 'personal consideration' that belong to group maintenance behavior. For maintenance and repair foremen were named six factors, i.e., 'consideration' that belongs to group maintenance behavior and 'specialty, planning', 'reporting, liaison', 'adjustment, rigidity', 'paper work confirmation', and 'example setting' that belong to goal achievement behavior. For subcontractors' field leaders were named seven factors, i.e., 'example setting, specialty and planning', 'careful guidance', 'rigidity', 'observance of rules' and 'paper work handling' that belong to goal achievement behavior and, 'consideration', 'frank communication'. In order to examine the validity of these items, we analyzed relationship between the 'morale'-(satisfaction, etc.) variables of the company's regular employees and subcontractors' employees and their leadership. It was found that the three leadership behavior scales for the section chiefs, maintenance and repair subsection chiefs and subcontractor leaders were very much the same as those found in private sector. (J.P.N.)

  19. Childhood leukaemia and non-Hodgkin's lymphoma near large rural construction sites, with a comparison with Sellafield nuclear site

    International Nuclear Information System (INIS)

    Kinlen, L.J.; Dickson, M.; Stiller, C.A.

    1995-01-01

    The objective was to determine whether population mixing produced by large, non-nuclear construction projects in rural areas is associated with an increase in childhood leukaemia and non-Hodgkin's lymphoma. A study was undertaken of the incidence of leukaemia and non-Hodgkin's lymphoma among children living near large construction projects in Britain since 1945, situated more than 20 km from a population centre, involving a workforce of more than 1000, and built over three or more calendar years. A 37% excess of leukaemia and non-Hodgkin's lymphoma at 0-14 years of age was recorded during construction and the following calendar year. The excesses were greater at times when construction workers and operating staff overlapped (72%), particularly in areas of relatively high social class. For several sites the excesses were similar to or greater than that near the nuclear site of Sellafield (67%), which is distinctive in its large workforce with many construction workers. Seascale, near Sellafield, with a ninefold increase had an unusually high proportion of residents in social class I. The findings support the infection hypothesis and reinforce the view that the excess of childhood leukaemia and non-Hodgkin's lymphoma near Sellafield has a similar explanation. (author)

  20. Design and construction work of underground pit for existing light oil tank foundation at Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kikuchi, Keita; Date, Masanao; Horimi, Shingo

    2017-01-01

    Based on the new regulatory standards for commercial power plant reactors enforced in July 2013, Onagawa Nuclear Power Station of Tohoku Electric Power Co., Inc. implemented various safety measure works. One of them was a measure for the existing light oil tank foundation for emergency diesel generators for Unit 2 reactor. In consideration of tornado, external fire, and earthquake resistance, the company implemented the underground pit construction for a light oil tank basement by utilizing the existing oil retaining wall and foundation. This paper reported the outline of the planning, design, and implementation of construction works, which were carried out while securing quality and safety. Upon installation of the underground pit, the company utilized the existing oil retaining wall from the viewpoint of reducing construction costs, shortening time schedule, and reducing environmental burden. As a result of checking bending and axial force, part of these values exceeded the design reference values. So, 3-dimensional shell model was applied, and the simulation results showed sufficient seismic margin. As a measure to secure seismic margin against shear force, Ceramic-Cap-bar construction method was adopted. Upon construction, the company adopted the water jet method, and devised the sequential order of construction. In parallel with the day and night work and tank installation, it constructed the top slab, which secured the time schedule and quality. (A.O.)

  1. Knowledge management implementation on the restart of the nuclear power plant construction

    International Nuclear Information System (INIS)

    Vetere, C.; Eppenstein, M.

    2007-01-01

    the retirement of personnel. Organizational Culture: The implementation of a KM promotes a cultural change within the organization of knowledge sharing, transferring and benchmarking, and the recording of the best practices in a systematic process making a more effective project execution that gives it a corporate administration. The IT Processes and Infrastructure Innovation and Improvement. The technical documents control (e.g. specifications, drawings, procedures, etc) is a relevant subject as it is not only good to make a more effective communication among the departments and external companies, but also to inform about the state of the engineering or the construction. Errors, inconsistencies, or wrong versions of documents could cause unnecessary costs, and the not fulfilling of the quality requirements or the regulatory aspects. Consequently, updating the Document Management System is one of the main tasks to be done due to the software and hardware evolution (e.g. the updating of the databases used in the past, new workflows and methods for information distribution, etc). The implementation of a KM Portal provides an IT platform to implement collaborative tools such as discussion forums, virtual meetings, virtual training programs, among others. In conclusion, the integration of a Knowledge Management to the Nuclear Power Project incorporates an essential strategic resource (know-how), and gives to the Project Manager additional tools that facilitate the planning, execution and control of the activities assuring, in a more efficient way, the achievement of the desired results. (author)

  2. Application of 3D model in the schedule management of nuclear power plant construction

    International Nuclear Information System (INIS)

    Nian Fayang

    2009-01-01

    While 3D technology has been widely used in engineering design, the 3D model of engineering design also includes information that can be used to construction. By the visual interface, the 3D model can be used in different aspects of construction. By linking the 3D model with the construction schedule, the 4D model can be created, through which the visual manage of the construction schedule can be achieved. (authors)

  3. The legal position of the operator and the constructor as regards construction of a nuclear power plant

    International Nuclear Information System (INIS)

    Sartorelli, Claudio

    1976-01-01

    Implementation of the Italian nuclear power programme requires that ENEL (the Italian State Electricity Agency) should solve a series of problems which are not only political, technical and financial, but also legal. The latter include the different positions held by constructors and operators in the nuclear law field. Although the operator must necessarily entrust construction work by contract to specialized agencies, the constructor as a person proper is completely ignored by the legislation in force, while the operator, as the holder of the construction licence is responsible with regard to all the provisions concerning controls, tests, inspections, etc. In recent years ENEL has frequently concluded ''turnkey'' contracts, but in future, given the desirability of diversifying the orders, ENEL may adopt a different policy, and negotiate different contracts with the suppliers of various components. (N.E.A.)

  4. Development of the radiological protection focus in the site, design and construction of the nuclear power plant in Cuba

    International Nuclear Information System (INIS)

    Rodriguez R, J.M.

    1996-01-01

    The first nuclear station in Cuba NPP Juragua, at present in analysis for starting again the construction, under a multinational economic association, had had as main architect/engineer organization the Design Institute for Nuclear Power Stations of St. Petersburg (former LIAEP). Active participation of Cuban radiation protection specialist of Energoproyecto in the Juragua Project began at the beginning of the site selection works and continued in the design and construction stages up till now, and simultaneously our specialists have been acting as a counterpart of soviet designers, responsible for the general design of the station. Furthermore, some additional works in compliance with the latest safety requirements and the best international practices, which are described, as well as ongoing and planned work were performed. (author). 11 refs., 3 figs

  5. Construction of an experimental simplified model for determining of flow parameters in chemical reactors, using nuclear techniques

    International Nuclear Information System (INIS)

    Araujo Paiva, J.A. de.

    1981-03-01

    The development of a simplified experimental model for investigation of nuclear techniques to determine the solid phase parameters in gas-solid flows is presented. A method for the measurement of the solid phase residence time inside a chemical reactor of the type utilised in the cracking process of catalytic fluids is described. An appropriate radioactive labelling technique of the solid phase and the construction of an eletronic timing circuit were the principal stages in the definition of measurement technique. (Author) [pt

  6. Speeding up the construction of nuclear electricity in accordance with the practice of China

    International Nuclear Information System (INIS)

    Zhang Wenqing; Chen Shuyun

    1986-01-01

    In order to fulfil the developing plan of national economy in China, the lasting and stable energy resources are needed. According to the tendency and present status of developing nuclear electricity in the world and the conditions in China, this paper has expounded that while the coal-fired and hydroelectric power plants are being developed actively, the nuclear power plants should be built step by step. At present importance must be attached to build medium and small sized nuclear power stations

  7. Construction of a sputtering reactor for the coating and processing of monolithic U-Mo nuclear fuel

    International Nuclear Information System (INIS)

    Schmid, Wolfgang

    2011-01-01

    In the presented thesis sputter deposition was used for the first time to coat monolithic U-Mo nuclear fuel foils with diffusion inhibitive materials. The intention of these coatings is to prevent the formation of an interdiffusion layer between U-Mo and Al cladding during the use of the fuel. A small sputtering reactor was built, in which the method was tested and processing parameters were investigated. In parallel a larger sputtering reactor was constructed, that allows to coat full size monolithic U-Mo nuclear fuel foils and was used to test an industrial application of the technique. As a result a method based on sputter deposition and erosion can be presented, that allows to clean as well as to coat the surface of monolithic U-Mo nuclear fuel foils in excellent quality. It can be included at any time into the manufacturing chain for U-Mo fuel elements, which is currently being developed.

  8. Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation – Challenges for a New Regulatory Body

    International Nuclear Information System (INIS)

    Viktorsson, C.

    2016-01-01

    Following an introduction with a description of the peaceful nuclear energy program in the United Arab Emirates (UAE) and an overview of the regulatory framework for safety, security and safeguards, this paper describes the regulatory approach for oversight of construction and the granting of an Operating Licence for the first nuclear power plant in the UAE. The paper describes the inspection programme set up by the Federal Authority for Nuclear Regulation (FANR) to verify construction and preoperational testing by the licensee. Moreover, it outlines the content of the operating licence application and focus areas for the regulatory review and assessment. Also, the paper describes the basic elements required by FANR for the decision-making regarding the issuance of the Operating Licence including integration of the results of review and assessment and the implementation of a systematic inspection programme to ensure operational readiness to operate and maintain the plant in accordance with FANR regulations. Finally, the paper addresses the preparation for regulatory oversight and the skill-set needed at FANR to ensure an effective and efficient oversight of safety, security of the nuclear energy power in the UAE. (author)

  9. Geologic studies on the Rio Una region (Iguape - Sao Paulo County), Brazil, for the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Hassano, S.; Mueller, M.; Stein, J.H.

    1984-01-01

    The main objective of the project was the geological and seismological characterization of 230 Km 2 along the coastal region between the Barro Branco and Jureia massifs in order to pinpoint one or more local areas showing adequate geological, morphological and geotechnical conditions suitable for construction of nuclear power plants. Results of the investigations, as well as the methodology used for determination of main interesting areas are presented. The best areas for construction are believed to be situated along the coast where Precambrian basement rocks crop out close to the shoreline. The Tertiary-Quaternary sedimentary cover reaches a thickness of 50 or more meters and the character of the sediments does not allow direct emplacement of foundations for heavy-weight constructions. Historical analysis of seismic activity of the region, as well as the study of faults and fracture zones identified in the area demonstrate the absence of active faults such as defined by internationally accepted safety criteria. (Author) [pt

  10. Administrative procedures for regulating construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Cochaud, J.P.

    1981-01-01

    This article first explains that nuclear power plants in France are governed by a complex system of regulations within the framework of different laws concerning, in particular, protection of the environment, public health and workers. It then examines the administrative procedures and the licensing regime for nuclear power plants. (NEA) [fr

  11. Construction of a nuclear power station in one's locality: attitudes and salience

    NARCIS (Netherlands)

    van der Pligt, J.; Eiser, J.R.; Spears, R.

    1986-01-01

    Examined the attitudes toward the building of a nuclear power station in one's locality by surveying 290 residents (mean age 47.5 yrs) of 3 small rural communities that were listed as possible locations for a new nuclear power station. Results show that a large majority of Ss opposed the building of

  12. Modular construction: 30 years of experience in the naval sector, useful for nuclear power plants

    International Nuclear Information System (INIS)

    Lepelletier, P.; Danguy des Deserts, S.

    2014-01-01

    This article reviews the benefits of modular construction in the sector of submarines that was implemented in the mid eighties in French shipyards. The design of the submarine is cut in different longitudinal parts so that each part can be built and completely equipped independently from the other parts. The different parts are then joined and welded at the end of the process of fabrication to form the submarine. The main advantages of such a construction are shorter construction times, standardized construction and a higher quality standard. DCNS proposes to use modular construction for the design of Flexblue which is an immersed small modular reactor (SMR). More generally, modular construction will add economic competitiveness to SMR reactors that will be necessary to their full development on a worldwide scale

  13. Nuclear power plants. Construction status report, data as of 30 Nov. 78

    International Nuclear Information System (INIS)

    1978-12-01

    The report is compiled to provide the information necessary for monitoring progress of the 94 plants under authorized construction. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement, which have been analyzed by the OMPA in implementing Management Information Systems. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  14. Nuclear air cleaning handbook. Design, construction, and testing of high-efficiency air cleaning systems for nuclear application

    International Nuclear Information System (INIS)

    Burchsted, C.A.; Kahn, J.E.; Fuller, A.B.

    1976-01-01

    The handbook is a revision of ORNL/NSIC-65. The purposes of the handbook are to summarize available information in a manner that is useful to the designer, to point out shortcomings in design and construction practice, and to provide guides and recommendations for the design of future systems

  15. Nuclear air cleaning handbook. Design, construction, and testing of high-efficiency air cleaning systems for nuclear application

    Energy Technology Data Exchange (ETDEWEB)

    Burchsted, C.A.; Kahn, J.E.; Fuller, A.B.

    1976-01-01

    The handbook is a revision of ORNL/NSIC-65. The purposes of the handbook are to summarize available information in a manner that is useful to the designer, to point out shortcomings in design and construction practice, and to provide guides and recommendations for the design of future systems. (TFD)

  16. Aspects of safety and of functional construction and configuration in planning and designing nuclear heating stations

    International Nuclear Information System (INIS)

    Adam, E.; Mueller, R.; Boettger, M.; Kremtz, U.

    1982-01-01

    The present studies are based on the design of a technological project of a nuclear heating station with a unit power of 250 MW. Essentially, this nuclear heating station is a three-circuit plant, the primary coolant circuit being based on natural circulation through the reactor vessel with integrated heat exchangers. Starting from the social objective and the derived development structure of the territory, the siting problems in integrating the nuclear heating stations have to be solved. On the basis of the resulting dimensions of the containment the technical and economical specifications of different versions of containment design are evaluated. (author)

  17. Planning of the regulatory inspection activity during manufacturing, construction and operation of the Italian nuclear plants

    International Nuclear Information System (INIS)

    Messore, G.A.

    1977-01-01

    After a brief review of the provisions in force in Italy on the inspection of nuclear installations the paper deals with the main criteria which determine the general and annual inspection programmes for every nuclear installation and the procedures for recording the results of inspections. It also describes the classification of nuclear installations into different categories according to the degree of hazard presented by their respective activities and consequently, the selection of the minimum number of inspections to be conducted every year for each of these categories. (NEA) [fr

  18. Application of integrated computer-aided engineering for design, construction and operation of nuclear power plant

    International Nuclear Information System (INIS)

    Kyung-shick Min; Byung-hun Lee

    1987-01-01

    Computer-aided-engineering (CAE) is an essential tool for modern nuclear power plant engineering. It greatly varies in definition, application, and technology from project to project and company to company. Despite the fast growing technologies and applications of CAE, its complexty and variety have thrown aonther puzzle to management of a nuclear project. Without due consideration of an integrated CAE system in early planning stage, the overall efficiency of a nuclear project would slow down due to the inefficiency in data flow. In this paper, practices and perspectives of CAE appliation are discussed under the Korea Power Engineering Company (KOPEC) philosophy in CAE approach. (author)

  19. Planning, design, and construction of nuclear power plants: an overview. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rhodes, D.A.; Rad, P.F.

    1977-12-01

    Chapters are included on generation system descriptions and alternative energy sources; load forecasting and growth projections; utility studies, program development, and analytical models; organizational alternatives and contract arrangements; project control in the design and construction phase; site management activities; construction activities; and startup and testing.

  20. Planning, design, and construction of nuclear power plants: an overview. Final report

    International Nuclear Information System (INIS)

    Rhodes, D.A.; Rad, P.F.

    1977-12-01

    Chapters are included on generation system descriptions and alternative energy sources; load forecasting and growth projections; utility studies, program development, and analytical models; organizational alternatives and contract arrangements; project control in the design and construction phase; site management activities; construction activities; and startup and testing

  1. Some special problems during the planning and construction of the Paks nuclear power station

    International Nuclear Information System (INIS)

    Szilagyi, Gyula; Szalai, Geza; Ferenczy, Gabor; Sarkoezy, Endre; Daniel, Gabor

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned. (R.P.)

  2. Some special problems during the planning and construction of the Paks nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Szilagyi, G.; Szalai, G.; Ferenczy, G.; Sarkoezy, E.; Daniel, G. (Eroemue es Halozattervezoe Vallalat, Eroeterv, Budapest (Hungary))

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned.

  3. On the local economy of nuclear power and the construction of Jiangxi

    International Nuclear Information System (INIS)

    Bao Lei; Huang Zhenliang

    2012-01-01

    Therefore, the development of nuclear power both for Jiangxi provide a stable economic development and protect the environment backed energy, reduce environmental pollution, thereby promoting the development of Jiangxi's economy by leaps and bounds. (authors)

  4. On the advisability of nuclear power plant construction and some solutions on their safety increase

    International Nuclear Information System (INIS)

    Sokolov, I.N.

    1989-01-01

    Neccesity in a further development of nuclear power in the USSR is proved. Specific features of layouts of nuclear heat supplying plants with increased safety including WWER-440, WWER-1000 and VK-50 reactors are considered. It is stressed that even under the most incredible accidents referring to the class of hypothetic ones, radioactive effect on the population, according to evaluations by experts, whould be much lower than maximum admissible one according to the existing standards

  5. Theoretical analysis and numerical modelling of heat transfer and fuel migration in underlying soils and constructive elements of nuclear plants during an accident release from the core

    International Nuclear Information System (INIS)

    Arutunjan, R.V.; Bolshov, L.A.; Vitukov, V.V.; Goloviznin, V.M.; Dykhne, A.M.; Kiselev, V.P.; Klementova, S.V.; Krayushkin, I.E.; Moskovchenko, A.V.; Pismennii, V.D.; Popkov, A.G.; Chernov, S.Y.; Chudanov, V.V.; Khoruzhii, O.V.; Yudin, A.I.

    1990-01-01

    Migration of fuel fragments and core fission products during severe accidents on nuclear plants is studied analytically and numerically. The problems of heat transfer and migration of volume heat sources in construction materials and underlying soils are considered

  6. Quality assurance during construction of civil engineering structures important to safety of nuclear facilities

    International Nuclear Information System (INIS)

    2011-11-01

    The present manual is developed to deal with quality assurance aspect of civil engineering structures in a greater detail. This manual gives detail to develop QA plans specific to multifarious activities of civil engineering construction

  7. Problems of making the laminar construction of the nuclear reactor safety hausing

    International Nuclear Information System (INIS)

    Ablewicz, Z.

    1980-01-01

    General specifications and operating conditions of a safety housing are followed by a characteristics of constructional materials and a description of basic problems connected with making the laminar structure of this housing. (author)

  8. Exploration and practice of data management in information construction of Tianwan nuclear power station

    International Nuclear Information System (INIS)

    Jiang Lirui; Wang Yinhui; Liu Feng; Zhu Yunfei; Song Jili

    2014-01-01

    The paper introduces the exploration and practices in TNPS data management system construction, data management system maturity model construction, management system maturity self-evaluation and data quality improvement, etc. Through the identification and illustration on TNPS data management functions and it also illustrates the effect of scientific management on the enterprise operation with the combination of the characteristics of Big Data Time. Then it looks into the prospect of the data management. (authors)

  9. Radioactive material defense construction using wind fan system against nuclear fallout in the aspect of nano-scopic dispersion

    International Nuclear Information System (INIS)

    Woo, Tae Ho

    2012-01-01

    Highlights: ► A realistic radiation protection system using aerodynamics is suggested. ► Manual formation procedure is constructed by this modeling. ► Chemical and natural accidents by wind fan are applicable. ► Nuclear disaster is avoided by national defense system. ► A sample case is realistically modeled. -- Abstract: Radioactive fallout defense system (RFDS) is suggested against possible nuclear accidents. A procedure consisting of several stages is considered. In particular, the dispersion of radioactive material is investigated for the case of wind fan operation where the radioactive molecules are considered as nano-scopic material. The modeling is done for one country dealing with a possible nuclear accident in another country. This study is thus applicable to regions where westerlies are prevailing. An aerodynamic fan analysis is performed. The incoming free wind stream is characterized by random sampling in Monte-Carlo simulation. The velocity of the fan is a critical aspect of the model. This model is applicable for volcanic ashes, nuclear bomb fallout, chemical material dispersion, and any other material combined with airflow. In addition, this fan could be studied, with nano-scale considerations, by a multi-scale technique.

  10. Managing Environmental Impact Assessment for Construction and Operation in New Nuclear Power Programmes

    International Nuclear Information System (INIS)

    2014-01-01

    This publication describes the environmental impact assessment (EIA) process, its utilization and the necessary infrastructure for such a process in order to provide a holistic approach for EIA in new nuclear power programmes. It also emphasizes the environmental aspects unique to a nuclear power programme, assuming that a State embarking on such a programme already has an environmental regulatory framework for the industrial projects in place. This publication also describes the phased implementation of the EIA programme in accordance with the phases described in IAEA Nuclear Energy Series No. NG-G-3.1. This publication is addressed to senior managers, project managers or coordinators and technical specialists of government authorities and agencies, including regulatory bodies, operating organizations and supporting industries, and other organizations involved in environmental issues

  11. Construction of experience feedback system for equipment supervision in nuclear engineering

    International Nuclear Information System (INIS)

    Zou Pingguo; Zhang Liying; Zhang Wenzhong

    2009-01-01

    Based on the analysis of the experience sources on equipment supervision in nuclear engineering, the details of the organization principle, working flow, and report requirement for the experience feedback system are introduced. The function range and its roll in the experience feedback system of the nuclear authority, nuclear power plant owners and equipment supervision organizations are illustrated. The standardization working requirements in the information gathering, analyzing, feedback and tracking process, and the characteristics and form of the incident report and feedback report are proposed. It emphasizes that the method for combined analysis of one significant incident and the whole incidents shall be adopted in the information analysis, and the experience feedback shall be considered in the development of equipment supervision technique and the equipment manufacturing, thus to maximize the use of experience feedback information to improve the pertinency and effectiveness of the experience feedback system. (authors)

  12. The social construction of risk and the controversial Brazilian Nuclear Program: among scientific, political and public

    International Nuclear Information System (INIS)

    Camelo, Ana Paula

    2015-01-01

    This research aims to investigate the Brazilian Nuclear Program (PNB) stating as reference the Fukushima nuclear accident. Its main purpose is to analyze how the Japanese accident impacted the PNB. Therefore, the program will be analyzed within 10-years (2004-2014) in order to answer this question. The discussion launched in this thesis is based on the framework of the Social Studies of Science and Technology, which enables the understanding of socio-technical controversies beyond the social or technological determinism. Through the discussion of the concepts of framing, socio-technical imaginary, risk and governance of science and technology, the research shows how the controversy in focus has resulted in the opportunity to consider not only economic, technological, environmental issues about nuclear energy, but also its political dimensions and challenges. Among these challenges, and from very different perspectives, arise questions about the role nuclear energy plays in the Brazilian context, the future of the program and the decision making process on these issues. Despite the central purpose of this study is essentially on risks, PNB and on the Brazilian context, it should be pointed that it is impossible to consider it in isolation of what is happening internationally (considering interests, tensions, relations between actors, etc.) The research thereby identifies key implications of Fukushima in the international context, but focuses on the disputes regarding possible review of the PNB. It also highlights how the socio-technical controversies, such as the nuclear energy, demand or impose a discussion on the governance of science and technology, risk and on the engagement of different sectors and actors in decision-making on issues, that are at the same time about energy, technology and nationality relevance. All this reflection is made from multi-sited analysis, which allowed following the controversy surrounding nuclear energy, reheated by the Fukushima

  13. Scheme of fault tectonic and tectonic activity manifestation in the region of the Crimea nuclear power plant construction

    International Nuclear Information System (INIS)

    Pasynkov, A.L.

    1989-01-01

    Characteristic of fault tectonics and tectonic activity manifestation in the region of the Crimea nuclear power plant construction is presented. Mosaic-block structure of the area, predetermined by the development of diagonal systems of activated tectonic dislocations with different displacement amplitudes and different stratigraphic ranges of manifestation, was established. Strained-stressed state of the region is determined by the presence of the South-Azov zone of deep fault and Krasnogorsk-Samarlinks fault system. The presented scheme can be used as tectonic basis of seismogenic activity of the region

  14. Technical and economic aspects of successful nuclear plant construction projects in the U.S. and future prospects

    International Nuclear Information System (INIS)

    Braun, C.; Rahn, F.J.

    1986-01-01

    Taken together as stones in a mosaic, the individual successes and failures of various nuclear plant construction programs begin to form a larger picture. Certain prerequisites to good experience become apparent. They are: agreement of need, constancy of purpose, rationalization of vendor/utility organizations, stable regulatory environment and plant standardization. Equally important is a belief that power plant costs can be contained and the commitment to do something about them. A Calvinist approach to spending, namely that costs are preordained and cannot be affected by mere men, is self-defeating. There is no escaping these conclusions nor the need to implement them

  15. The social and economic impact created by construction of a nuclear power station: the part played by local companies

    International Nuclear Information System (INIS)

    Rongere, H.

    1983-01-01

    The president of the Sedan Chamber of Commerce and Industry and managing director of a public works company indicates how local and regional firms involved in the construction of the Chooz B power plant in the Ardennes organized themselves to cater for the requirements of the EDF. The measures taken by these firms to adapt themselves to the demanding and complex nuclear power market are indicated and further the repercussions of the on site work on employment levels and business activity are indicated [fr

  16. Effect of construction of Dukovany nuclear power plant on development of organizational structure of Prumyslove Stavby Brno

    International Nuclear Information System (INIS)

    Miks, L.

    1985-01-01

    Prumyslove stavby was set up in 1969 and its structure has undergone considerable changes. No major changes were made during the pre-production stage and in the construction preparation period (1969-77). With increased building work volume the organizational structure expanded: new units, such as building site plants, etc., were opened. The current period is characterized by gradual reduction in production capacity, mainly in units providing special jobs. All production units will be closed down with the termination of the nuclear power plant in 1987. (Pu)

  17. Design and construction of the movable limiters for holding the plasma in position in the nuclear fusion experiment TEXTOR

    International Nuclear Information System (INIS)

    Butzek, D.A.; Derichs, K.

    1983-11-01

    The nuclear fusion experiment TEXTOR (Tokamak Experiment for Technology Oriented Research) has been constructed for investigation of plasma-wall-interaction. The plasma is generated inside a torus-shaped vacuum vessel. In addition to the magnetic fields mechanical limiters are provided to hold the plasma in position. The limiter scheme of textor consists of main limiters and reference limiters (measuring limiters). Main and reference limiters are mounted in different cross sections of the torus. The main limiters are movable during the plasma discharge while the reference limiters are kept fixed. They are adjustable. Thus, by moving the main limiters, the reference limiters can be exposed to different thermal loads during the discharge. Exposing the reference limiters to the plasma, first results have been obtained concerning the scrape off layer: thickness, fluxes of hydrogen and chromium through this layer. The limiter scheme, the final design and construction of the limiters and the first phase of operation are described in this report. (orig.) [de

  18. Nuclear plant refurbishment calls for patience. [Construction of radioactive effluent plant

    Energy Technology Data Exchange (ETDEWEB)

    Henly, Anna

    1989-08-01

    All nuclear power plants produce a small quantity of liquid effluent from wash hand basins, showers and surface drains on the site. The effluent is termed low-level radioactive waste and under the 'Radioactive Substances Act' can be discharged into estuaries or the sea. Before a controlled discharge can be made the effluent has to be chemically treated and have any radioactive particulate matter removed. The replacing of the radioactive effluent plant at the Berkeley nuclear power station in the United Kingdom is described, with particular reference to the vigorous safety standards and quality assurance programme operated by the Central Electricity Generating Board. (author).

  19. Construction of new nuclear power plant in Bulgaria - incentives and problems

    International Nuclear Information System (INIS)

    Popov, M.; Bataklieva, L.; Hinovski, I.

    2002-01-01

    Advantages and disadvantages of constriction of new nuclear power plant in Bulgaria are discussed. Several options for further development are considered: Completion of the Belene NPP; Evolutionary design installations PWR technology, 600 MW (AP-600 Westinghouse design; B-407 Russian design); Standard design of Framatome, 900 MW; Standard design - heavy water technology CANDU-6 (700 MW) and other.The results of the preliminary economic analyses show that the first two options are approximately equal, but the all options are acceptable from investment point of view, considering an average macro economic environment. The need of assessment of all aspects (technical, economical, financial, social, environmental, national infrastructure) of nuclear sector development is outlined

  20. Experience with drilling and blasting work during construction of Mochovce nuclear power plant

    International Nuclear Information System (INIS)

    Mraz, M.; Vojta, A.; Podel, R.

    1986-01-01

    The results are discussed of four years of investigating the technical and economic parameters of drilling and blasting equipment employed on the building site of the Mochovce nuclear power plant. The technical and operating characteristics are given of tested breaking and drilling sets manufactured by various foreign companies. The final choice was based on output, hard currency prices, power demand, operating reliability and number of personnel required for operation. The optimal set consists of two Hausherr HBM 70 drilling systems (holes with a diameter of 130 to 150 mm) and two ROC 601-02 Atlas Copco machines (auxiliary work, breaking foundation holes for nuclear reactors). (J.C.)

  1. Quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    1975-04-01

    This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants. This guide applies to all types of nuclear power plants. (U.S.)

  2. Supplementary quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    This standard sets forth the supplementary quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel for nuclear power plant construction. The requirements may also be extended to other appropriate parts of nuclear power plants when specified in contract documents. This standard is intended to be used in conjunction with ANSI N45.2

  3. Issues related to the construction and operation of a geological disposal facility for nuclear fuel waste in crystalline rock - the Canadian experience

    Energy Technology Data Exchange (ETDEWEB)

    Allan, C.J.; Baumgartner, P.; Ohta, M.M.; Simmons, G.R.; Whitaker, S.H. [Atomic Energy of Canada Ltd., Pinawa, MB (Canada). Whiteshell Labs

    1997-12-31

    This paper covers the overview of the Canadian nuclear fuel waste management program, the general approach to the siting, design, construction, operation and closure of a geological disposal facility, the implementing disposal, and the public involvement in implementing geological disposal of nuclear fuel waste. And two appendices are included. 45 refs., 5 tabs., 10 figs.

  4. Framework for monitoring the social and economic impacts associated with the construction of the Skagit Nuclear Project in Skagit County, Washington

    International Nuclear Information System (INIS)

    Merwin, D.J.; Greene, M.

    1977-01-01

    The paper discusses an information system which has been developed to monitor the social and economic impacts associated with the construction of twin nuclear reactors in Skagit County, Washington, by Puget Sound Power and Light Company. The monitoring system has been specifically designed to track the social and economic impacts of the Skagit Nuclear Project as they occur

  5. Issues related to the construction and operation of a geological disposal facility for nuclear fuel waste in crystalline rock - the Canadian experience

    International Nuclear Information System (INIS)

    Allan, C.J.; Baumgartner, P.; Ohta, M.M.; Simmons, G.R.; Whitaker, S.H.

    1997-01-01

    This paper covers the overview of the Canadian nuclear fuel waste management program, the general approach to the siting, design, construction, operation and closure of a geological disposal facility, the implementing disposal, and the public involvement in implementing geological disposal of nuclear fuel waste. And two appendices are included. 45 refs., 5 tabs., 10 figs

  6. Tunnel Boring Machine Cutter Maintenance for Constructing Underground Cable Lines from Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Jae Wang; Yee, Eric

    2014-01-01

    The tunnel boring machine (TBM) can construct an underground tunnel efficiently and without construction noise vibration related problems. Many civil projects, such as NPP construction, set importance on the economics of construction. Thus, advance rate, which is the speed at which the TBM is able to progress along its intended route, is one of the key factors affecting construction period and construction expenses. As the saying goes, time is money. Right Double Quotation Mark In addition, it is important to manage construction permits and civil complaints, even when construction expenses and construction periods are excluded. So, accurate prediction for advance rate is important when designing tunnel project. Several designers and project owners have tried to improve construction efficiency and tunneling advance rate.. There have been several studies on managing the rate of wear, designing an optimum tunnel face, and finding the optimum cutter spacing. Cutter replacements due to cutter wear and tear are very important because the wear and tear of cutters attached to the cutter head profoundly affect the advance rate. To manage cutter wear and tear is to control parameters related to cutter shape and cutter wear rate. There have been studies on the relationship between rock properties or TBM characteristics, and cutter wear or replacement. However, many of these studies relied on computer simulations or other small scale experiments. Therefore, this paper attempts to present a correlation between cutter replacement or cutter wear, against various parameters using practical data such as rock quality and TBM shield specifications, from an actual construction site. This study was conducted to suggest directions in the improvement of TBM cutters by analyzing relationships between rock conditions and cutter maintenance as well as TBM advance rates. Actual field data was collected and compared to actual design values in evaluating the effectiveness of traditional

  7. Tunnel Boring Machine Cutter Maintenance for Constructing Underground Cable Lines from Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Wang; Yee, Eric [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    The tunnel boring machine (TBM) can construct an underground tunnel efficiently and without construction noise vibration related problems. Many civil projects, such as NPP construction, set importance on the economics of construction. Thus, advance rate, which is the speed at which the TBM is able to progress along its intended route, is one of the key factors affecting construction period and construction expenses. As the saying goes, time is money. Right Double Quotation Mark In addition, it is important to manage construction permits and civil complaints, even when construction expenses and construction periods are excluded. So, accurate prediction for advance rate is important when designing tunnel project. Several designers and project owners have tried to improve construction efficiency and tunneling advance rate.. There have been several studies on managing the rate of wear, designing an optimum tunnel face, and finding the optimum cutter spacing. Cutter replacements due to cutter wear and tear are very important because the wear and tear of cutters attached to the cutter head profoundly affect the advance rate. To manage cutter wear and tear is to control parameters related to cutter shape and cutter wear rate. There have been studies on the relationship between rock properties or TBM characteristics, and cutter wear or replacement. However, many of these studies relied on computer simulations or other small scale experiments. Therefore, this paper attempts to present a correlation between cutter replacement or cutter wear, against various parameters using practical data such as rock quality and TBM shield specifications, from an actual construction site. This study was conducted to suggest directions in the improvement of TBM cutters by analyzing relationships between rock conditions and cutter maintenance as well as TBM advance rates. Actual field data was collected and compared to actual design values in evaluating the effectiveness of traditional

  8. Nuclear methods in constructing engineering - present state, tendencies, education and in-service training

    International Nuclear Information System (INIS)

    Baumbach, H.

    1988-01-01

    Evaluation and status of nuclear methods in the field of civil engineering are pointed out. Exemplary remarks are made out neutron small-angle scattering and on field gradient-impulse NMR method for studies of hydration of cement concrete. Moreover, the application of radioisotopes in gas concrete production, gamma radiography and gamma tomography are discussed in detail. (author)

  9. Inspection-evaluation interphase in the design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Santoma, L.

    1979-01-01

    Some questions to be considered in the planning of inspection-evaluation interface are analysed. Some characteristics of a nuclear project are also analysed, such as its importance relative to safety or their frequency. The types of reviews and controls used by the various participants in a project are studied. Finally, the types of tests to be performed by regulatory agencies are classified. (author)

  10. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    International Nuclear Information System (INIS)

    DiNunzio, Camillo A.; Gupta, Abhinav; Golay, Michael; Luk, Vincent; Turk, Rich; Morrow, Charles; Geum-Taek Jin

    2002-01-01

    OAK-B135 This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies

  11. Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    DiNunzio, Camillo A. [Framatome ANP DE& S, Marlborough, MA (United States); Gupta, Abhinav [Univ. of North Carolina, Raleigh, NC (United States); Golay, Michael [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Luk, Vincent [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Turk, Rich [Westinghouse Electric Company Nuclear Systems, Windsor, CT (United States); Morrow, Charles [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jin, Geum-Taek [Korea Power Engineering Company Inc., Yongin-si, Gyeonggi-do (Korea, Republic of)

    2002-11-30

    This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.

  12. Seismic stress of plants and equipment in nuclear power station construction

    International Nuclear Information System (INIS)

    Hampe, E.; Schwarz, J.

    1984-01-01

    The applicability of floor spectra for designing components of nuclear power plants taking into account seismic effects is discussed. Methods for the determination of seismic floor excitation and various kinds of floor spectra are presented. As an example the floor spectra method is applied to containment buildings

  13. Method for forming nuclear fuel containers of a composite construction and the product thereof

    International Nuclear Information System (INIS)

    Cheng, B.-C.; Rosenbaum, H.S.; Armijo, J.S.

    1981-01-01

    An improved method of producing a composite nuclear fuel container is described which comprises a casing or fuel sheath of zirconium or its alloy with a lining cladding of deposited copper superimposed over the inside surface of the zirconium or alloy and a layer of oxide of the zirconium or alloy formed on the inside surface of the casing or sheath. (U.K.)

  14. A policy of nuclear energy or energy conservation - on the construction of a wrong alternative

    International Nuclear Information System (INIS)

    Traube, K.

    1981-01-01

    From the content: a secret good-bye - wrong information from the energy experts - is there any priority for the efficient utilization of energie - do nuclear energy and energy conservation measures complement each other - the hidden socio-political dimensions - counter-information is necessary. (HP) [de

  15. Project and construction of a measurement system and nuclear radiations analysis

    International Nuclear Information System (INIS)

    Castro, R. B. de.

    1983-01-01

    A counting system was designed and built, aiming to: detect and measure nuclear radiations using a Geiger-Mueller counter; and to measure the amplitudes of pulses from either a proportional or a NaI detector. The results obtained of the Cs-137 and Co-60 energy spectra were compared with results obtained from other researches. (Author) [pt

  16. Construction and start-up tests for Unit No. 5 of Fukushima Daiichi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, T; Sunami, Y; Ishii, N; Yokojima, T [Toshiba Corp., Kawasaki, Kanagawa (Japan)

    1978-12-01

    This unit, with an output capacity of 874 MWe, was completed by Toshiba last April on the basis of the actual operation records of the units previously completed and the experience in construction. Since its completion it has continued very excellent operation, with no emergency stop. This article is a description of the Unit 5, about: (1) the design and major points of improvement; (2) the construction work and cleaning of the plant; and (3) the operation tests, the use of the first automatic fuel exchanger, and the plant management system including the rust-preventive measures for two years since the oil-crisis.

  17. Constructing an I and C Upgrade Architecture for Korea Standard Nuclear Power Plants

    International Nuclear Information System (INIS)

    Suh, Yong Suk; Hur, Seop; Kim, Dong Hoon; Sung, Chan Ho; Kang, Hyun Tai; Lee, Jae Ki; Cho, Chang Hwan

    2008-01-01

    This paper presents three architectures of the KSNP I and C upgrade. The architectures are constructed with an adoption of PLCs and DCS technology and 3-phase upgrade strategy. The 3-phase upgrade strategy is established to ensure the safety of the upgrade. Based on the architecture, the cabinet configuration is being constructed. From the configuration, it is expected to figure out how to optimize the layout of the cabinets. It is required to study the performance and safety design requirements of the upgrade further

  18. Environmental standard review plans for the environmental review of construction permit applications for nuclear power plants

    International Nuclear Information System (INIS)

    1979-05-01

    Information is presented concerning environmental descriptions; plant description; environmental impacts of construction; environmental impacts of station operation; environmental measurements and monitoring programs; environmental impacts of postulated accidents involving radioactive materials; the need for the plant; alternatives to the project; and evaluation of the proposed action

  19. The atmospheric corrosion, important technical and economic factor in the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Rodriguez, R.; Diaz, J.; Gomez, J.; Rodriguez, J.

    1995-01-01

    In order to determine the atmospheric effects of the construction of the Juragua NPP some experiments were performed in the reactor site. Samples of carbon steel were placed in experimental stations and the consequent oxidation was measured. The results show that the region's atmosphere aggressiveness may be classified from low to median. 11 refs

  20. Experience in the construction of a spent nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Yamashita, Hiroshi

    1976-01-01

    The construction and operation of a reprocessing plant was first published in 1956. The Reprocessing Expert Committee of AEC was established in 1959, and the preliminary design was finished in 1964 by NCP of Britain. The detailed design was completed in 1969 by SGN of France, and the training of operators was carried out in parallel with this in France. The results of the safety investigation was approved in Jan. 1970, and the construction was started in June 1971. The site of the reprocessing plant is the eastern part of the Tokai Establishment of PNC. The process adopted is the wet Purex process having been established in large practical plants. The treating capacity is 0.7 t/day. The main processes are acceptance and storage, mechanical treatment, and chemical treatment. The reprocessing facilities comprise the main shop, the analysis station, the main exhaust stack, the decontamination station, the solid waste store, the sea discharge pipe, and other incidental facilities. The construction works were about 7 months behind the schedule when the water flow test was finished. The chemical test was finished in March, 1975, and the uranium test is in progress since Sept., 1975. The problems for future are the developments of effective waste treatment and storing techniques, and the researches have been carried out by PNC. The construction project of the second plant is urgently required, since it takes 10 years from planning to operation. (Kako, I.)

  1. Concrete for the construction of No. 1 nuclear power generator of Tokyo Denryoku Co.'s Kashiwazaki, Kariha nuclear power station

    International Nuclear Information System (INIS)

    Suzuki, Yasuyoshi; Eguchi, Kiyoshi; Nakakomi, Akira.

    1985-01-01

    The construction of the No.1 power generator of Kariha nuclear power generator was completed on March 1985, and the installations of equipments are on their way aiming the start in October 1960. About 900,000 m 3 of concrete was produced and used for whole work and about 500,000 m 3 out of total was used for the construction of plant building. For constructing reactor building and turbin building, the concrete must have shielding property against radiation. The specific gravity no less than 2.5 was required for dry state of laid concrete. In order to supply very large amount of concrete with stable quality, preliminary investigation on raw materials including aggregates, fly-ash and surface active agents, were made. Aggregates were stored in underground bins to keep the temperature constant for the purpose of obtaining mixed concrete with constant temperature. For determining the mixing rate of concrete, physical test such as slump test, determination of air content, determinations of strengths and specific gravities of solidified concrete. Quality control committee was established to observe the optimum condition, which were confirmed by preliminary tests, of concrete preparation. As the results of detailed preliminary investigation on respective raw material and strict quality control from the source of raw material to mixed concrete, the supply of concrete with stable quality which conforms every requirement of standard, was possible. (Ishimitsu, A.)

  2. Ingredients of success in the design and construction of the french nuclear power plants

    International Nuclear Information System (INIS)

    Bacher, P.; Panossian, J.; Riollet, G.

    1989-01-01

    A nuclear program can be compared to a pastry. There are many ingredients, a lot of know-how, an adequate cooking and some good luck to achieve success or back luck to fail. The French nuclear program has had all the ingredients of success and the necessary luck. The present paper presents the major ingredients: strong and well defined policies, an adapted industrial organization, original management methods, dedicated men, political and popular support. The main results of the French program, well known today, are only briefly be presented. The last part of the paper show the very strong interactions between operation and design, and how experience is fed back into the design both of new and of older plants. The conclusion calls for new ingredients for future success

  3. Construction of Temelin nuclear power plant and its impact on possible recreational uses of the area

    Energy Technology Data Exchange (ETDEWEB)

    Uvirova, E

    1985-01-01

    The possible recreational use is assessed of the territory within 25 kms from the Temelin nuclear power plant site. The territory includes 3 tourist areas (South Bohemian lakes, Middle Vltava, Tabor area). From the point of view of time usability, all three areas are of the single-season type, i.e., they are used in the summer season, as they are oriented to water sports and tourism. Neither the Temelin nuclear power plant nor its 3 km protective zone overlap with the reacreational areas, and thus the areas can also in future be used for tourism. The use of the Temelin plant in district heating will contribute to reducing fallout from the existing thermal power plants. (J.C.).

  4. Construction of Temelin nuclear power plant and its impact on possible recreational uses of the area

    International Nuclear Information System (INIS)

    Uvirova, E.

    1985-01-01

    The possible recreational use is assessed of the territory within 25 kms from the Temelin nuclear power plant site. The territory includes 3 tourist areas (South Bohemian lakes, Middle Vltava, Tabor area). From the point of view of time usability, all three areas are of the single-season type, i.e., they are used in the summer season, as they are oriented to water sports and tourism. Neither the Temelin nuclear power plant nor its 3 km protective zone overlap with the reacreational areas, and thus the areas can also in future be used for tourism. The use of the Temelin plant in district heating will contribute to reducing fallout from the existing thermal power plants. (J.C.)

  5. Construction of the enterprise content management system in nuclear power plants

    International Nuclear Information System (INIS)

    Cai Canyin; Wu Jiangang

    2013-01-01

    Data has gradually become a strategic resource to achieve enterprise sustainable development, improve decision-making level and innovation ability. Enterprise data, characterized by diversity of source and complexity of type, expand rapidly. The structured data processed by the traditional relation database management system (RDBMS) account for only 15% of the total information data worldwide. However, the rest 85% of the world's information data are unstructured, including paper documents, reports, video and audio files. How to manage these unstructured information has become a big problem for traditional structured data management. The enterprise content management system is an effective way to solve this problem. This paper analyses the present situation of some of domestic nuclear power enterprise content management system, makes suggestions on selection of enterprise content management system, discusses the practical application of the enterprise content management system in a nuclear power plant. (authors)

  6. Requirements and criteria for choosing sites suitable for the construction of nuclear installations and power stations

    International Nuclear Information System (INIS)

    1978-05-01

    The present document explains the selection criteria for areas in Italy suitable for the installation of nuclear power stations to be included in the 'National Site Map' provided for in Section 23 of Act No 393 of 2 August 1975. It represents the results of a thorough investigation into the various aspects of the problem of siting nuclear power stations, at the present stage of technology, taking into account the effect of the installations on the environment and the effect of the environment on the installations. The essential aim is to demonstrate that the requirements derived from these analyses, and on which there was full consultation with the other controlling bodies of European countries (in particular, France, Great Britain and West Germany) ensure the optimum choice of areas from the point of view of safety and public health. (author)

  7. Design and construction of a Cherenkov imager for charge measurement of nuclear cosmic rays

    Energy Technology Data Exchange (ETDEWEB)

    Bourrion, O; Bernard, C; Bondoux, D; Bouly, J L; Bouvier, J; Boyer, B; Brinet, M; Buenerd, M; Damieux, G; Derome, L; Eraud, L; Foglio, R; Fombaron, D; Grondin, D; Marton, M; Pelissier, A [Laboratoire de Physique Subatomique et de Cosmologie, Universite Joseph Fourier Grenoble 1, CNRS/IN2P3, Institut Polytechnique de Grenoble, 53, rue des Martyrs, Grenoble (France); Lee, M H; Lutz, L [University of Maryland, College Park MD 20742 (United States); Menchaca-Rocha, A [Instituto de Fisica, UNAM, A.P. 20-364, 01000 Mexico DF (Mexico); Perie, J N, E-mail: olivier.bourrion@lpsc.in2p3.fr [Universite de Toulouse, INSA, UPS, Mines Albi, ISAE, ICA (Institut Clement Ader), 133, avenue de Rangueil, F-31077 Toulouse (France)

    2011-06-15

    A proximity focusing Cherenkov imager called CHERCAM, has been built for the charge measurement of nuclear cosmic rays with the CREAM instrument. It consists of a silica aerogel radiator plane across from a detector plane equipped with 1,600 1'' diameter photomultipliers. The two planes are separated by a ring expansion gap. The Cherenkov light yield is proportional to the charge squared of the incident particle. The expected relative light collection accuracy is in the few percents range. It leads to an expected single element separation over the range of nuclear charge Z of main interest 1 {<=} Z{approx}<26. CHERCAM is designed to fly with the CREAM balloon experiment. The design of the instrument and the implemented technical solutions allowing its safe operation in high altitude conditions (radiations, low pressure, cold) are presented.

  8. Design and construction of a Cherenkov imager for charge measurement of nuclear cosmic rays

    International Nuclear Information System (INIS)

    Bourrion, O; Bernard, C; Bondoux, D; Bouly, J L; Bouvier, J; Boyer, B; Brinet, M; Buenerd, M; Damieux, G; Derome, L; Eraud, L; Foglio, R; Fombaron, D; Grondin, D; Marton, M; Pelissier, A; Lee, M H; Lutz, L; Menchaca-Rocha, A; Perie, J N

    2011-01-01

    A proximity focusing Cherenkov imager called CHERCAM, has been built for the charge measurement of nuclear cosmic rays with the CREAM instrument. It consists of a silica aerogel radiator plane across from a detector plane equipped with 1,600 1'' diameter photomultipliers. The two planes are separated by a ring expansion gap. The Cherenkov light yield is proportional to the charge squared of the incident particle. The expected relative light collection accuracy is in the few percents range. It leads to an expected single element separation over the range of nuclear charge Z of main interest 1 ≤ Z∼<26. CHERCAM is designed to fly with the CREAM balloon experiment. The design of the instrument and the implemented technical solutions allowing its safe operation in high altitude conditions (radiations, low pressure, cold) are presented.

  9. Nuclear Power and Climate Change: Construction and Consequences of a Geopolitical Rhetoric in France and Sweden

    International Nuclear Information System (INIS)

    Meyer, Teva

    2017-01-01

    The political awakening to the climate- change issue in the 1980's has durably de-structured the antinuclear movements. Previously held as the highest global threat, atomic energy became a potential solution to the contemporary environmental challenges thanks to its low emissions of greenhouse gases. However, it appears that these upheavals have not identically impacted every country, as evidenced by the diversity of reactions after the Fukushima accident. Relying on the study of two highly nuclearized countries, France and Sweden, this article intends to analyze the consequences of the climate argument on the balance of power between actors of the conflict over atomic energy's future. While in France, this new issue triggered an internal crisis within the antinuclear movement which did not structurally influence the conflict, it led in Sweden to a complete reorganization of the debate, thus facilitating the return of nuclear power in 2011 in the country

  10. Development of knowledge acquisition methods for knowledge base construction for autonomous nuclear plant

    Energy Technology Data Exchange (ETDEWEB)

    Sasajima, M.; Kitamura, Y.; Mizoguchi, R. [Osaka Univ., Ibaraki (Japan). Inst. of Scientific and Industrial Research; Yoshikawa, S.

    1994-03-01

    This report describes a development of an ontology for computerized representation of behaviors and functions of number power plants. This ontology also enables computers to predict plant behaviors under assumed changes of boundary conditions and to derive cause identification suggestions of observed anomalies, as well as to represent functions and behaviors. Technical requirements in this development were recognized as clarified distinguishment of functions from behaviors and efficient plant behavior reasoning, and these have been successfully attained. The purpose of this development is to achieve knowledge sharing between human and automized instrumentation and control system about nuclear plant functions and behaviors, to realize cooperation of human and automized system for safe and cost acceptable nuclear plant operation. (author)

  11. Design and construction of demineralized water production and maintenance system for RA-O nuclear reactor

    International Nuclear Information System (INIS)

    Rumis, D.; Martin, H.R.

    1990-01-01

    The normal operation of zero power RA-O Nuclear Reactor requires a production and maintenance of demineralized water system. This system was designed and built-up during the works for actualization, upgrading and new start up at Cordoba National University of this facility. This paper comments the relevant aspects about the didactical purpose of that system and the details considered for training and practices with it. Similarly, considerations about solids wastes and effluents treatment are discussed. (Author)

  12. The sequence coding and search system: an approach for constructing and analyzing event sequences at commercial nuclear power plants

    International Nuclear Information System (INIS)

    Mays, G.T.

    1990-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has recognized the importance of the collection, assessment, and feedback of operating experience data from commercial nuclear power plants and has centralized these activities in the Office for Analysis and Evaluation of Operational Data (AEOD). Such data is essential for performing safety and reliability analyses, especially analyses of trends and patterns to identify undesirable changes in plant performance at the earliest opportunity to implement corrective measures to preclude the occurrence of a more serious event. One of NRC's principal tools for collecting and evaluating operating experience data is the Sequence Coding and Search System (SCSS). The SCSS consists of a methodology for structuring event sequences and the requisite computer system to store and search the data. The source information for SCSS is the Licensee Event Report (LER), which is a legally required document. This paper describes the objectives of SCSS, the information it contains, and the format and approach for constructing SCSS event sequences. Examples are presented demonstrating the use of SCSS to support the analysis of LER data. The SCSS contains over 30,000 LERs describing events from 1980 through the present. Insights gained from working with a complex data system from the initial developmental stage to the point of a mature operating system are highlighted. Considerable experience has been gained in the areas of evolving and changing data requirements, staffing requirements, and quality control and quality assurance procedures for addressing consistency, software/hardware considerations for developing and maintaining a complex system, documentation requirements, and end-user needs. Two other approaches for constructing and evaluating event sequences are examined including the Accident Precursor Program (ASP) where sequences having the potential for core damage are identified and analyzed, and the Significant Event Compilation Tree

  13. Repository for spent nuclear fuel. Preliminary construction description - layout D Oskarshamn the Simpevarp area

    International Nuclear Information System (INIS)

    2006-02-01

    This report presents the preliminary design of a repository located in the Simpevarp area. The description has been disposed so as to deal primarily with the site dependent layouts for the above- and underground constructions. The report is disposed as follows: c1 gives the background and some basic information. Chapter 2 presents the demands and necessary conditions that take precedence when adapting the plant to the local conditions, construction, operation and closure. Chapter 3 is a general description of the area, its infrastructure and the specific sites that have been studied. Chapter 4-5 describe the design of the plant for the two chosen sites. Chapter 6 gives a review of data for the plant, and Chapter 7 'References' is the last part of the main document. The appendices A-I give brief information on the general, non-site specific, parts of the plant, e.g. buildings, life cycle, system, operation and organization

  14. Repository for spent nuclear fuel. Preliminary construction description - layout D Oskarshamn the Laxemar area

    International Nuclear Information System (INIS)

    2006-05-01

    This report presents the preliminary design of a repository located in the Laxemar area. The description has been disposed so as to deal primarily with the site dependent layouts for the above- and underground constructions. The report is disposed as follows: Chapter 1 gives the background and some basic information. Chapter 2 presents the demands and necessary conditions that take precedence when adapting the plant to the local conditions, construction, operation and closure. Chapter 3 is a general description of the area, its infrastructure and the specific sites that have been studied. Chapters 4-5 describe the design of the plant for the two chosen sites. Chapter 6 gives a review of data for the plant, and Chapter 7 'References' is the last part of the main document. The appendices A-I give brief information on the general, non-site specific, parts of the plant, e.g. buildings, life cycle, system, operation and organization

  15. Twin-crane placement of pressure vessel, PSW speeds nuclear construction project

    International Nuclear Information System (INIS)

    Kamais, A.

    1982-01-01

    A new crane design, the twin Transi-Lift, that can lift and walk both a reactor pressure vessel (RPV) and a primary shield wall (PSW), was chosen by Gulf States Utilities (GSU) for its River Bend station on the basis of performance, availability, and cost. The lifts avoid delays because they can be assembled and taken down away from the construction site. Nine photographs illustrate how the lift operated. es

  16. Construction techniques for containment dome shuttering work of nuclear island of fast reactor

    International Nuclear Information System (INIS)

    Qiao Shoucheng

    2008-01-01

    The difficult dome shuttering work was completed with more or less traditional construction method based on the shuttering system formed with shaped-steel belfast truss of the positioning beam, wood camber beam as keel, 50 mm-thick wood block as face plate, and fastener or bowl-buckle scaffold tool as the support, in which certain social and economic benefits were made. All these are supported by technology. (authors)

  17. Production of heparanase constructs suitable for nuclear magnetic resonance and drug discovery studies.

    Science.gov (United States)

    Mosulén, Silvia; Ortí, Leticia; Bas, Esperanza; Carbajo, Rodrigo J; Pineda-Lucena, Antonio

    2011-02-01

    Heparanase is an endo-β-D-glucosidase capable of specifically degrading heparan sulphate, one of the main components of the extracellular matrix. This 65 kDa polypeptide is implicated in cancer processes such as tumour formation, angiogenesis and metastasis, making it a very attractive target in antitumour treatments. Structure-based approaches to find inhibitors of heparanase have been historically hampered by the lack of success in crystallizing the protein. With the aim to undertake the NMR structural characterisation of heparanase, we have designed and produced, using recombinant methods, smaller constructs of heparanase containing the catalytically active glutamic acids and the two binding sites for heparan sulphate. An extensive range of expression and purification conditions were evaluated to alleviate the intrinsic low solubility and aggregation propensity of heparanase, allowing the obtention of the enzyme in milligram quantities, both unlabelled and ¹⁵N-labelled for NMR studies. Using the smallest of the designed constructs and applying NMR and SPR methodologies, we have demonstrated that known inhibitors of heparanase bind to this construct specifically and selectively with K(D) values in the range of those reported for human heparanase, validating it for future drug discovery projects focused on the identification of novel inhibitors of this enzyme. © 2010 Wiley Periodicals, Inc.

  18. Construction and start-up testing experience of Kashiwazakikariwa Nuclear Power Station Unit No.1

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Murakami, Hideaki

    1986-01-01

    In order to overcome the new location condition in Japan Sea coast, new techniques were developed and adopted to ensure the safety in construction and to shorten the construction period as far as possible. The commercial operation was started on September 18, 1985. This plant is a BWR plant of 1100 MWe output. The results of the improvement and standardization of BWRs and the measures for reliability improvement and radiation dose reduction were fully adopted in this plant. The site of the power station and the layout of the main facilities are explained. As the features of the location condition, the severe weather condition in winter such as snow, wind and lightning and high waves in the sea were considered. The rockbed for installing the foundation of the reactor building was deep, and the aseismatic design condition was made stricter, accordingly, the quantity of materials increased. A tent dome was developed to cover above the reactor containment vessel being assembled, a lightning forecast system was installed, and synchro-lift method was adopted for caisson breakwaters. The countermeasures to the deep rockbed and the measures to shorten the construction period were taken. The results of the trial operation are reported. (Kako, I.)

  19. Comparative analysis of structural concrete quality assurance practices on nine nuclear power plant construction projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.L. Jr.

    1978-06-01

    The basic objective of this research effort was to perform a comparative analysis of the Quality Assurance practices related to the structural concrete phase on nine nuclear power plant projects which are (or have been) under construction in the United States in the past ten years. This analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects. For those aspects of the Quality Assurance system which can be considered managerial in nature (i.e., organizational relationships, types of Quality Assurance programs, corrective action procedures, etc.) an attempt has been made to present the alternative approaches that were identified. For those aspects of the Quality Assurance system which are technical in nature (i.e., the frequency of testing for slump, compressive strength, etc.) an attempt has been made to present a comparative analysis between projects and in relation to the recommended or mandated practices presented in the appropriate industry codes and standards.

  20. Comparative analysis of structural concrete quality assurance practices on nine nuclear power plant construction projects. Final report

    International Nuclear Information System (INIS)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.L. Jr.

    1978-06-01

    The basic objective of this research effort was to perform a comparative analysis of the Quality Assurance practices related to the structural concrete phase on nine nuclear power plant projects which are (or have been) under construction in the United States in the past ten years. This analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects. For those aspects of the Quality Assurance system which can be considered managerial in nature (i.e., organizational relationships, types of Quality Assurance programs, corrective action procedures, etc.) an attempt has been made to present the alternative approaches that were identified. For those aspects of the Quality Assurance system which are technical in nature (i.e., the frequency of testing for slump, compressive strength, etc.) an attempt has been made to present a comparative analysis between projects and in relation to the recommended or mandated practices presented in the appropriate industry codes and standards

  1. Effect of geometric construction on residual stress distribution in designing a nuclear rotor joined by multipass narrow gap welding

    International Nuclear Information System (INIS)

    Tan, Long; Zhang, Linjie; Zhang, Jianxun; Zhuang, Dong

    2014-01-01

    Highlights: • The internal stress of the pipe is measured using local material removal method. • Bottom protrusion at weld seam can release the stress and mitigate stress evolution. The through-wall axial stress is bending type under the effect of the rotor discs. • The impact of geometric construction on the stress evolution begins after pass 15. - Abstract: The purpose of this study is to investigate the effect of geometric construction on the distribution of residual stresses before and after heat treatment in designing a nuclear welded rotor. The local material removal method was used to measure internal residual stress of the experimental pipe after post weld heat treatment. Three finite element models were employed as follows: a model of experimental pipe, a model with a bottom protrusion existed at the weld region, and a model of two rotor discs butt-welded with a bottom protrusion at the weld region. Investigated results showed that the bottom protrusion existed at the weld region can decrease the residual stress and mitigate the stress evolution significantly on the inner surface. Under the binding effect of the rotor discs, the axial stress of inner surface region is compressive stress; the through-wall axial stress at the weld center line can be deemed to a bending type; both the hoop stress and axial stress at the weld center line on the inner surface are compressive. The impact of geometric construction on the stress evolution at the root bead begins after pass 15 deposited

  2. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction; El proyecto de construccion de la central nuclear de Flamanville 3. La participacion de Iberdrola Ingenieria y Construccion

    Energy Technology Data Exchange (ETDEWEB)

    Diaz Prada, J. I.; Cubian, B.

    2014-10-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  3. Study on safety performance evaluation system of nuclear engineering construction units based on AHP

    International Nuclear Information System (INIS)

    Xu Yulin; Sun Jian; Shi Xiaofan

    2012-01-01

    As a very effectual management mean, the performance management has extensively used by many companies of China for staff assessment. The author explored the establishment of the 'Safety Performance Evaluation System' by finding out the similarities in operation between a company and a team of nuclear power projects. Then the author analyzed the principles of the performance management and good practices and summarized safety management experiences. The weight of the system index by using AHP method was calculated in this article. (authors)

  4. Problems of building social and production bases for the construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Suchopar, J.

    1984-01-01

    A survey is given of capital costs of building parts and the concept is presented of the equipment of a building site. The social basis consists of accommodation units, cloakrooms, catering units, utility units, a health care centre and a shopping centre. The production base consists of a central concrete plant, cement plant, central armour unit, forming hall, storage area, buildings for pre-assembly, fleet of trucks and other machines, maintenance and repair shops. The network infrastructure and the mains connections are designed and the procedure of the build up of the site is described. The experience is summed up and recommendations made for future nuclear power plant projects. (E.S.)

  5. Backfitting possibilities of process instrumentation during planning, construction or operation of nuclear power plants

    International Nuclear Information System (INIS)

    Kaiser, G.E.; Schemmel, R.R.; Warren, H.D.

    1985-01-01

    The necessity for backfitting existing C and I equipment in nuclear power plants arises as a result of new licensing requirements being imposed or through a need for improved performance as experience with operating plants becomes available. These changes arise either because additional process variables need to be monitored; improved sensors need to be installed (to increase safety or operating margin); more directly sense the processes; or to address concerns in signal conditioning, control algorithms, control system strategy, or safety system design. This paper discusses examples of backfitting experiences on existing plants and some being developed for future improvements

  6. RCC-C: Design and construction rules for fuel assemblies of PWR nuclear power plants

    International Nuclear Information System (INIS)

    2015-01-01

    The RCC-C code contains all the requirements for the design, fabrication and inspection of nuclear fuel assemblies and the different types of core components (rod cluster control assemblies, burnable poison rod assemblies, primary and secondary source assemblies and thimble plug assemblies). The design, fabrication and inspection rules defined in RCC-C leverage the results of the research and development work pioneered in France, Europe and worldwide, and which have been successfully used by industry to design and build nuclear fuel assemblies and incorporate the resulting feedback. The code's scope covers: fuel system design, especially for assemblies, the fuel rod and associated core components, the characteristics to be checked for products and parts, fabrication methods and associated inspection methods. The RCC-C code is used by the operator of the PWR nuclear power plants in France as a reference when sourcing fuel from the world's top two suppliers in the PWR market, given that the French operator is the world's largest buyer of PWR fuel. Fuel for EPR projects is manufactured according to the provisions of the RCC-C code. The code is available in French and English. The 2005 edition has been translated into Chinese. Contents of the 2015 edition of the RCC-C code: Chapter 1 - General provisions: 1.1 Purpose of the RCC-C, 1.2 Definitions, 1.3 Applicable standards, 1.4 Equipment subject to the RCC-C, 1.5 Management system, 1.6 Processing of non-conformances; Chapter 2 - Description of the equipment subject to the RCC-C: 2.1 Fuel assembly, 2.2 Core components; Chapter 3 - Design: Safety functions, operating functions and environment of fuel assemblies and core components, design and safety principles; Chapter 4 - Manufacturing: 4.1 Materials and part characteristics, 4.2 Assembly requirements, 4.3 Manufacturing and inspection processes, 4.4 Inspection methods, 4.5 Certification of NDT inspectors, 4.6 Characteristics to be inspected for the

  7. Lessons from American-German nuclear power plant construction. Quality, safety and costs of an attempt to integrate American and German nuclear power plant technology

    International Nuclear Information System (INIS)

    Buchwald, K.

    1979-05-01

    The 1300 MW nuclear power plant at Muelheim-Kaerlich has been under construction since the beginning of 1975. It is being equipped with a pressurised water reactor which has been adapted to the German client's requirements and German licensing practice, based on a license held by Babcock and Wilcox USA (B and W). The problems which have arisen in making this adaptation are the result of different requirements in the USA and the Federal Republic of Germany which make it very difficult to integrate the two technologies. Full integration will almost certainly be impossible, but integration to the widest possible extent is important because it might mean both greater safety and reduced costs. In this article it is intended to show where the problems of integration lie and how they might perhaps be overcome. (author)

  8. Environment and ecology in the design and construction of a nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Lebreton, J C [Electricite de France, 75 - Paris. Dept. Etudes Generales Programmes-Sites Environnement

    1975-01-01

    The purpose of the studies on the environment of nuclear stations is to reduce changes to the surroundings as much as possible in order not to interfere with ecosystems and consequently impede human activities. A nuclear power station implies heat discharges, radioactive effluent, and wastes and produces a certain sound level and creates aesthetic problems of space occupation. The main questions dealt with are those of heat discharge and noise, together with architectural and aesthetic problems. In the first two cases the intention is to define as accurately as possible the levels reached by the temperature or noise parameter. Where noise is concerned it is enough to know these levels in order to define an eventual hindrance to the target in question, the human being in this case. For heat fluxes man is not directly involved and further research is planned to identify the sensitivity of plants and animals. Since the environment also covers aesthetics, an effort is made to safeguard and improve the quality of the landscape.

  9. Environment and ecology in the design and construction of a nuclear power station

    International Nuclear Information System (INIS)

    Lebreton, J.-C.

    1975-01-01

    The purpose of the studies on the environment of nuclear stations is to reduce changes to the surroundings as much as possible in order not to interfere with ecosystems and consequently impede human activities. A nuclear power station implies heat discharges, radioactive effluent and wastes, produces a certain sound level and creates aesthetic problems of space occupation. The main questions dealt with are those of heat discharge and noise, together with architectural and aesthetic problems. In the first two cases the intention is to define as accurately as possible the levels reached by the temperature or noise parameter. Where noise is concerned it is enough to know these levels in order to define an eventual hindrance to the target in question, the human being in this case. For heat fluxes man is not directly involved and further research is planned to identify the sensitivity of plants and animals. Since the environment also covers aesthetics, an effort is made to safeguard and improve the quality of the landscape [fr

  10. Using PROGUMBEL to predict extreme external hazards during nuclear power plant construction

    International Nuclear Information System (INIS)

    Diburg, S.; Hoelscher, N.; Niemann, H.J.; Meiswinkel, R.

    2010-01-01

    Safety considerations concerning the construction of power plants, supporting structure planning, safety concept and structural design require reliable data on external events, their incidence probability and characteristic parameters. The basis for supporting structure calculations based on probabilistic reliability considerations is the knowledge on the statistical distribution or the incidence frequency of specific phenomena and their characteristic basic variables. The extreme value statistics software PRO GUMBEL is the extended version of the original GUMBEL software used for seismic assessments. The authors describe the features of the software, that covers seismic events, flooding and extreme storms.

  11. Regulatory inspection activities on nuclear power plant sites during construction in the United Kingdom

    International Nuclear Information System (INIS)

    Jeffery, J.V.

    1977-01-01

    The work of regulatory inspection of the construction of the plant on the site is performed not only by the inspector who has been allocated to inspection duties for that site but also by the specialist staff who are involved with the safety assessment of the plant. The co-ordination of this work is described in the paper and examples are given of inspection activities associated with the enforcement requirements of licence conditions as well as those related to the inspection of the plant itself. (author)

  12. Superiority of centralized procurement and its technical and economic analysis for nuclear power intensification construction

    International Nuclear Information System (INIS)

    Wang Feng

    2010-01-01

    The intensified management is the basic orientation for modernized enterprise group to improve efficiency and benefit. For most industrial enterprises, in the implementation of intensification management process, the centralized procurement is one of most efficient paths. At present most of the international's and domestic outstanding enterprises are studying and positively using this approach. This article indicated that the centralized procurement mode is inevitable during intensification construction process based on the theoretical analysis of the advantage of centralized procurement and the economic analysis of typical cases. (author)

  13. Extensive Analysis of Worldwide Events Related to The Construction and Commissioning of Nuclear Power Plants: Lessons Learned and Recommendations

    International Nuclear Information System (INIS)

    Noel, M.; Zerger, B.; Vuorio, U.; )

    2011-01-01

    Lessons learnt from past experience are extensively used to improve the safety of nuclear power plants (NPPs) worldwide. Although the process of analyzing operational experience is now widespread and well developed, the need for establishment of a similar process for construction experience was highlighted by several countries embarking on construction of new NPPs and in some international forums including the Working Group on the Regulation of New Reactors (WGRNR) of the OECD-NEA. In 2008, EU Member State Safety Authorities participating to the EU Clearinghouse on Operational Experience Feedback decided to launch a topical study on events related to pre-operational stages of NPPs. The aim of this topical study is to reduce the recurrence of events related to the construction, the initial component manufacturing and the commissioning of NPPs, by identifying the main recurring and safety significant issues. For this study, 1090 IRS event reports, 857 US Licensee Event Reports (LERs) and approximately 100 WGRNR reports have been preselected based on key word searches and screened. The screening period starts from the beginning of the databases operation (in the 1980's as far as IRS and LER database are concerned) and ends in November 2009. After this initial screening, a total of 582 reports have been found applicable (247 IRS reports, 309 LERs and 26 WGRNR reports). Events considered for this study were those which have been initiated before the start of commercial operation, and detected before or even long after commercial operation. The events have been classified into 3 main categories (construction, manufacturing and commissioning), and into further sub-categories (building structures, metallic liners, electrical components, anchors, I and C, penetrations and building seals, emergency diesel generators, pipes, valves, welds, pumps, etc.) in order to facilitate the detailed analysis with the final objective to formulate both equipment specific

  14. Design and construction of solidification and dewatering facility at Alabama Power Company's Farley Nuclear Plant

    International Nuclear Information System (INIS)

    Farnsworth, P.

    1988-01-01

    The approximate total cost of the structure and supporting piping systems is estimated to be 4.1 million dollars. Total dose savings per year could be as high as 70 man Rem for resin processing alone. The ability to store refueling equipment, process contaminated oils, load and unload trucks and containers regardless of weather conditions and support repair work on equipment greatly enhances the cost effectiveness of the project. It will take at least one year of operation of the facility to accurately assess the true cost savings to Alabama Power Company. The morale factor for the Waste and Decon Group has escalated measurably due to the dose reduction to our personnel. Plant and company management are well pleased due to the possibility of a spill or release to the environment has been eliminated which was on intangible cost. Facility construction has been completed as of this date and resin transfer anticipated within the next few days. Some of the problems encountered in planning and constructing this solidification and dewatering facility are presented. A safety evaluation for the facility is included in the appendix

  15. Inspection activities of the Mexican regulatory body during the construction stage of the first unit of Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Salgado Gonzalez, Julio Ricardo

    1996-01-01

    The paper addresses the regulatory framework established for the design, construction and operation of the NPP. The regulatory bases of the inspection program are mentioned.A summary of the inspection and reviewing activities carried out by the former Nuclear Safety Management Construction area during the construction stage, taking the year 1977 as the beginning of regular inspection activities for this construction stage, and up to the year 1987, when this one is considered as practically completed, and a stage of pre-operational tests has been started. Finally, the main inspection areas are described, and a summary is given of the classification of deficiencies detected during the inspections

  16. Construction of PWR nuclear cross sections for transient calculations. Test of the ANTI program against TWODIM

    International Nuclear Information System (INIS)

    Thorlaksen, B.

    1981-05-01

    Nuclear cross sections for fuel assemblies of the more recent Westinghouse designs, representing two different PWR reactor cores, are calculated as functions of average fuel temperature, moderator density, and moderator poison concentration. The cross-section functions are verified by referring to Westinghouse power-shape calculations and other analysis. Computations on the side reflector resulted in significantly higher albedo values than used previously for BWR's in similar nodal codes. This led to an investigation of the influence of the internodal coupling coefficients on the power shape. It is concluded that the calculated power shape is strongly dependent, on the choise of coupling coefficients. However, it is shown that ''the correct'' set of coupling coefficients depends mostly on the nodal configuration, and that it is fairly independent of the power condition. (author)

  17. Study and installation of concrete shielding in the civil engineering of nuclear construction (1960)

    International Nuclear Information System (INIS)

    Dubois, F.

    1960-01-01

    The object of this report is to give technical information about high density concretes which have become very important for radiation biological shielding. The most generally used heavy aggregates (barytes, ilmenite, ferrophosphorus, limonite, magnetite and iron punching) to make these concretes are investigated from the point of view prospecting and physical and chemical characteristics. At first, a general survey of shielding concretes is made involving the study of components, mixing and placing methods, then, a detailed investigation of some high density concretes: barytes concrete, with incorporation of iron punching or iron shot, ferrophosphorus concrete, ilmenite concrete and magnetite concrete, more particularly with regard to grading and mix proportions and testing process. To put this survey in concrete form, two practical designs are described such as they have been carried out at the Saclay Nuclear Station. Specifications are given for diverse concretes and for making the proton-synchrotron 'Saturne' shielding blocks. (author) [fr

  18. The construction of the GKN 2 nuclear power plant. Pt. 1 and 2

    International Nuclear Information System (INIS)

    Rau, G.; Zaiss, W.

    1987-01-01

    Unit 2 of the nuclear power station is a convoy plant with a 4-loop PWR of 1314 MW gross electricity output. The contractual period of delivery up to takeover is 67 months. The contractual operators of unit 1 and unit 2 are: Neckarwerke (NW), Esslingen, the Technical Works of Stuttgart Municipality, (TWS), the Federal Railways (DB), and the Cement Works Lauffen (ZEAG). In addition, the electric utility Energieversorgung Schwaben (EVS) has signed as an operator of unit 2, because of its higher unit output. These partners own the following shares, related to the gross power output of both units: NW 41.5%, TWS 25.6, DB 17.5%, EVS 12.4%, ZEAG 3.0%. (orig./GL) [de

  19. Construction of pulse badge for upper extremities dosimetry in nuclear medicine

    International Nuclear Information System (INIS)

    Cunha, Cledison de Jesus; Souza, Divanizia do Nascimento

    2005-01-01

    In the manipulation of radioactive materials in nuclear medicine service the body parts of the worker who more is displayed to the ionizing radiation is hands, forearm and arm. Therefore it is necessary to developing badges for easy reproduction monitoring and low cost to determine the doses level radiation received by the worker in these extremities. The aim of this work is to investigation of a new pulse badge, that is developed with thermoluminescent detectors of CaSO 4 :Dy (TLD) in a small plate of acrylic, perforated cardboard to deposit the TLD. This set was involved in plastic to protect of humidity and other harmful ambient factors, moreover, a bracelet was inserted, adaptable for any worker. This badge had been gotten resulted satisfactory, with a reply to the enough dose for a dosimetric evaluation. (author)

  20. Alternative technology of containment construction for WWER 1000 nuclear power plant

    International Nuclear Information System (INIS)

    Chalus, Z.

    1982-01-01

    A number of alternatives was assessed for the assembly of the steel elements of the cylindrical part of containment. Alternative 1 is based on the common technology of manufacture, transport and assembly of reinforced concrete blocks of ca. 3x12 m in size, used for building leak-proof walls of WWER 440 nuclear power plants. Alternative 2 is based on reinforced concrete blocks using 12x12 m blocks assembled from individual elements on the building. site. Alternative 3 is a specific variant of the previous alternative. Alternative 4 envisages the assembly of a prefabricated support structure made of steel. Alternative 5 is based on the gradual assembly of partial elements mounted onto a support structure. Alternative 6 only differs from 5 in the method of assembly and manufacture of the support structure. All alternatives are shown in diagrams. (J.B.)

  1. Corrosion studies on materials of construction for spent nuclear fuel reprocessing plant equipment

    International Nuclear Information System (INIS)

    Kamachi Mudali, U.; Dayal, R.K.; Gnanamoorthy, J.B.

    1993-01-01

    Corrosion studies on specimens of commercial Type 304L stainless steel (SS), nuclear grade type 304L SS, extra low-carbon nitric acid grade (NAG) Uranus-16 SS, NAG Uranus-65 SS, Ti, Ti-5% Ta, Ti-0.25% Pd, Zircaloy-2, weldments of Ti and of Ti-5% Ta, and surface-modified (thermally oxidised and anodised) Ti were carried out to assess their corrosion resistance in nitric acid medium. The results indicated that Zircaloy-2, Ti-5% Ta, Uranus-16 SS and Uranus-65 SS have excellent corrosion resistance in boiling nitric acid solution. Specimens of Zircaloy-2, Ti-5% Ta and thermally-oxidised Ti showed excellent corrosion resistance also in a simulated uranium-containing reprocessing medium in a concentrated nitric acid solution. SEM and XRD analyses were carried out on the tested specimens to examine the scale morphology and phases present on the surface. (orig.)

  2. ITER nuclear components, preparing for the construction and R and D results

    Energy Technology Data Exchange (ETDEWEB)

    Ioki, K. E-mail: iokik@itereu.de; Akiba, M.; Barabaschi, P.; Barabash, V.; Chiocchio, S.; Daenner, W.; Elio, F.; Enoeda, M.; Ezato, K.; Federici, G.; Gervash, A.; Grebennikov, D.; Jones, L.; Kajiura, S.; Krylov, V.; Kuroda, T.; Lorenzetto, P.; Maruyama, S.; Merola, M.; Miki, N.; Morimoto, M.; Nakahira, M.; Ohmori, J.; Onozuka, M.; Rozov, V.; Sato, K.; Strebkov, Yu.; Suzuki, S.; Tanchuk, V.; Tivey, R.; Utin, Yu

    2004-08-01

    Progress has been made in the preparation of the procurement specifications for key nuclear components of ITER. Detailed design of the vacuum vessel (VV) and in-vessel components is being performed to consider fabrication methods and non-destructive tests (NDT). R and D activities are being carried out on vacuum vessel UT inspection with waves launched at an angle of 20 deg. or 30 deg. , on flow distribution tests of a two-channel model, on fabrication and testing of FW mock-ups and panels, on the blanket flexible support as a complete system including the housing, on the blanket co-axial pipe connection with guard vacuum for leak detection, and on divertor vertical target prototypes. The results give confidence in the validity of the design and identify possibilities of attractive alternate fabrication methods.

  3. ITER nuclear components, preparing for the construction and R&D results

    Science.gov (United States)

    Ioki, K.; Akiba, M.; Barabaschi, P.; Barabash, V.; Chiocchio, S.; Daenner, W.; Elio, F.; Enoeda, M.; Ezato, K.; Federici, G.; Gervash, A.; Grebennikov, D.; Jones, L.; Kajiura, S.; Krylov, V.; Kuroda, T.; Lorenzetto, P.; Maruyama, S.; Merola, M.; Miki, N.; Morimoto, M.; Nakahira, M.; Ohmori, J.; Onozuka, M.; Rozov, V.; Sato, K.; Strebkov, Yu; Suzuki, S.; Tanchuk, V.; Tivey, R.; Utin, Yu

    2004-08-01

    Progress has been made in the preparation of the procurement specifications for key nuclear components of ITER. Detailed design of the vacuum vessel (VV) and in-vessel components is being performed to consider fabrication methods and non-destructive tests (NDT). R&D activities are being carried out on vacuum vessel UT inspection with waves launched at an angle of 20° or 30°, on flow distribution tests of a two-channel model, on fabrication and testing of FW mock-ups and panels, on the blanket flexible support as a complete system including the housing, on the blanket co-axial pipe connection with guard vacuum for leak detection, and on divertor vertical target prototypes. The results give confidence in the validity of the design and identify possibilities of attractive alternate fabrication methods.

  4. Outline of construction planning on No. 2 Reactor of the Shika Nuclear Power Plant

    International Nuclear Information System (INIS)

    Nakagawa, Tetsuro; Kadoki, Shuichi; Kubo, Tetsuji

    1999-01-01

    The Hokuriku Electric Co., Ltd. carries out the expansion of the Shika Nuclear Power Plant No.2 (ABWR) to start its in March 2006. It is situated in north neighboring side of No. 1 reactor under operation at present, and its main buildings are planned to position a reactor building at mountain side and a turbine building at sea side as well as those in the No. 1 reactor. And, cooling water for steam condenser was taken in from an intake opening built at north side of the lifting space situated at the front of the power plant, and discharged into seawater from a flashing opening positioned about 600 m offing. Here were described on outline of main civil engineering such as base excavation engineering, concrete caisson production, oceanic establishment engineering, and facility for steam condenser, and characteristics of the engineering. (G.K.)

  5. Framework programme for detailed characterisation in connection with construction and operation of a final repository for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2010-10-15

    This report presents a programme for the detailed investigations planned to be applied during construction and operation of the repository for spent nuclear fuel at Forsmark. The report is part of SKB's application according to the Nuclear Activities Act. The detailed investigations shall provide relevant data on and site-descriptive models for the bedrock, soil deposits and eco-system of the site in order to facilitate a step-wise design and construction of the final repository. This shall be implemented in a manner that all demands on long-term safety are fulfilled, including accurate documentation of the construction work, and so that assessments of the environmental impact of the repository can be made. For the operational phase, the detailed investigations should also provide support to the deposition process with related decisions, thereby enabling fulfilment of the design premises for the siting and construction of deposition tunnels and deposition holes, as well as for deposition of canisters, and for the subsequent backfilling and closure of the repository. The Observational Method will be applied during the construction of the repository. This method entails establishing in advance acceptable limits of behaviour regarding selected geoscientific parameters and preparing a plan with measures to keep the outcome within these limits. Predictions of expected rock properties are established for each tunnel section. The outcome after excavation is compared with the acceptable range of outcomes. Information from detailed characterization will be of essential importance for application of the Observational Method and for adapting the repository to the prevailing rock properties. SKB has for the past several decades developed methods for site characterisation, applying both above- and underground investigation techniques. Experiences from this work, put into practice during the site investigations, has resulted in a solid knowledge and understanding of the

  6. Collect, analyze and data base for building up the investment reports of Center for Nuclear Science and Technology construction project

    International Nuclear Information System (INIS)

    Pham Quang Minh; Tran Chi Thanh; Cao Dinh Thanh; Mai Dinh Trung; Hoang Sy Than; Nguyen Nhi Dien; Trinh Van Giap; Le Ba Thuan; Vu Tien Ha

    2014-01-01

    Following the Contract No.19/HD/NVCB dated July 10, 2013 signed by the President of Vietnam Atomic Energy Institute (VINATOM), an additional ministerial Project was approval by the Decision No. 526/QD-VNLNT dated July 8, 2013 by the VINATOM President in order to implement an important task for VINATOM. This project was implemented by the Institute for Nuclear Science and Technology (INST) in Hanoi as management organization and VINATOM as the owner of project results. Main objectives of this Project are to support national budget for implementing to collected the general report from previous projects which are relevant to CNEST and new research reactor, IAEA guidance documents, documents provided by ROSATOM in seminars in 2010, 2012 and 2013, report from expert visits of Ministry of Science and Technology and completed the general report about the construction project of CNEST. (author)

  7. Non-destructive study of new construction materials for advanced nuclear reactors

    International Nuclear Information System (INIS)

    Simeg Veternikova, J.; Slugen, V.; Sabelova, V.; Sojak, S.; Petriska, M.

    2013-01-01

    Microstructure of new construction steels for advanced reactor systems with different type of structure: oxide dispersion strengthened steel - ODS Eurofer (20% Cr), ferritic-martensitic steel Eurofer 97 and austenitic steel NF 709 were studied by positron annihilation lifetime spectroscopy. Samples were measured before and after helium ion implantation (He"+); therefore microstructure changes and radiation resistance to alpha particles of these steels were observed. Defect accumulation due to the radiation treatment was assumed in all investigated materials; therefore positron mean-lifetimes will increase up with notable change. The paper compares radiation damage of different type of structure and point out to the most radiation resistant structure/material from the investigated ones. (authors)

  8. Radiation conditions is the region of Rovenskaya nuclear power plant construction

    International Nuclear Information System (INIS)

    Konstantinov, Yu.O.; Teplykh, A.A.; Kataev, V.T.; Dikaya, E.Ya.; Lisachenko, Eh.P.; Ponikarov, V.I.

    1978-01-01

    With a view to optimizing the monitoring of radiation conditions in the vicinity of NPP, an area extending 15-20 km around the construction site of the Rovenskaya atomic energy plant was surveyed. The level of natural gamma-radiation, contents of 90 Sr and 137 Cs in environmental objects, and doses of radiation received by the population from incorporated 137 Cs was studied. It was found that while the average natural gamma-radiation background was relatively low, local levels of the gamma background varied strongly with the type of soil and the pattern of housing systems in the human settlements concerned. The contents of 90 Sr and 137 Cs were also found to fluctuate considerably with the sampling site. 137 Cs was relatively high in cow's milk and in members of the community. The results obtained will be taken into account in the radiation monitoring program

  9. Quality assurance of construction work on Dukovany nuclear power plant site

    International Nuclear Information System (INIS)

    Lachs, W.

    1983-01-01

    In order to eliminate the effects of the shrinking of concrete of the 150x70 m 2 bed slab 1 m thick, the slab was divided into 36 segments. The side walls were made of steel wire netting and the segments were concreted using the chessboard method. The second concreting was made only after the volume changes in the first concrete layer terminated. The density of the concrete of the shielding was controlled using routine methods as well as a radiometric densimeter which may be used on the building site, the technological procedure was checked by ultrasound, the surface of the concrete structures designed for epoxy coatings must be even and of uniform grain size. Volume moisture of the bed slab must be less than 4% and temperature lower than 10 degC. All deliveries, assembly and construction work must have a certificate of quality awarded after thorough tests and verification. (E.S.)

  10. Regulatory requirements on the design and construction of nuclear power plant control and instrumentation systems in Finland

    International Nuclear Information System (INIS)

    Heikkila, M.A.

    1978-01-01

    The Department of Reactor Safety of the Institute of Radiation Protection, being the nuclear regulatory authority in Finland, has set up regulations which govern the design and construction of NPP systems and components. The regulations are partly compiled from existing codes and standards, published primarily in the United States and Federal Republic of Germany, and partly worked out at the Institute. The regulations are collected to a special set of YVL guides (guides for nuclear power plants), and one of these gives requirements on the design and construction of NPPCI systems and components. The scope of the requirements is based on the safety classification of the CI systems and components. Three safety classes have been singled out: the first for CI systems which take part in reactor protection, the second for other directly safety related, and the third for remaining CI systems important enough to deserve supervision. The safety class for CI components is inherited from the system they belong to. The safety classification of IC systems has direct bearing on the initial assumptions of plant accident analysis. The design principles of IC systems are inspected as part of the preliminary and final safety reports. Focus is directed on the principles of redundancy, separation, diversity, testability, etc. The requirements on IC components are directed to different stages of manufacture, installation and operation. The type tests shall be adequate and acceptably documented. The manufacture of components is followed, the test reports reviewed and the efficiency of manufacturers quality assurance program evaluated. Further requirements concern the installation phase and tests at the end of it, and finally guides include directions for maintenance and testing during the operations phase. (author)

  11. The application of an integrated approach to design, procurement and construction in reducing overall nuclear power plant costs. Annex 19

    International Nuclear Information System (INIS)

    Didsbury, R.; Shalaby, B.A.; Torgerson, D.F.

    2002-01-01

    As part of its on-going efforts to reduce the cost of CANDU nuclear power plants, AECL has embarked on an integrated approach to design, procurement and construction activities associated with new CANDU 6 and CANDU 9 projects. The approach is predicated on the fact there is a vast quantity of information that needs to be managed and controlled over the life of a nuclear power plant project. Therefore, ensuring the completeness and correctness of all the information needed by all project participants, facilitating sharing of this information amongst the project's participants, and automating the various deliverable production processes offers significant potential not only for overall project cost (and schedule) savings but also for reducing operations and maintenance costs once the plant enters service. Facilitating and indeed of key importance to this approach is the use of a suite of integrated information technology-based engineering, procurement and project control tools used throughout the design, engineering, procurement and construction phases of the project. A unique and important feature of these tools is their high degree of integration both from a work process and a data perspective. Use of these tools is well underway on AECL's Qinshan Project which is realizing significant benefits in cost and schedule. This paper will describe the approach AECL is taking, along with the tools it has both put in place, and those additional items planned for the future along with the cost, schedule and quality benefits that arise from their use. Progress to date on the Qinshan project also will be discussed as well as the expected application to the plant once it has gone into service will also be discussed. (author)

  12. Comparative analysis of structural concrete Quality Assurance practices on nine nuclear and three fossil fuel power plant construction projects. Final summary report

    International Nuclear Information System (INIS)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.J. Jr.

    1978-12-01

    A summary of two reports, COO/4120-1 and COO/4120-2, is given. A comparative analysis was made of the Quality Assurance practices related to the structural concrete phase on nine nuclear and three fossil fuel power plant projects which are (or have been) under construction in the United States in the past ten years. For the nuclear projects the analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. For the fossil projects the analysis identified the response of each Quality Assurance program to criteria similar to those which were applicable in the nuclear situation. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects

  13. Construction of scales to measure leadership behaviors at nuclear power plants. 3

    Energy Technology Data Exchange (ETDEWEB)

    Misumi, Jyuji; Yamada, Akira [Institute of Nuclear Safety System Inc., Kyoto (Japan); Shinohara, Shinobu [and others

    1994-05-01

    In this study, we studied the relationship between organizational commitment (Sekimoto, et al, 1985, 1986) and leadership, and `morale`-(satisfaction, etc.) using employees working at nuclear power plants as subjects as part of organizational climates. As a result of the Quantification III and Multiple Regression analysis, it became clear that organizational commitment is related to personal factors in `morale`. Above all, it was suggested that the traditional organizational commitment characterized by relying on companies, such as a desire to stay with the companies, voluntary motivation and internalization of companies` values is higher according to the degree of their satisfaction with the companies and motivation toward work. With regard to self-interest-oriented organizational commitment, the more they are dissatisfied with personal factors in `morale`, the stronger their self-interest-oriented organizational commitment is. In ANOVA using leadership types as independent variable, it was found that leadership types are significantly effective, depending on the degree of the traditional or company-reliant organizational commitment, namely, those employees who perceive their superiors to be of PM type have higher organizational commitment. In our analysis of subcontractors` employees, it was found that their self-interested-oriented organizational commitment was the lowest under leaders of PM type. From these results, it became clear that the degree of organizational commitment varies, depending on the leadership types of their supervisors. (author)

  14. Quality assurance and control in constructing the Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Lujka, T.

    1986-01-01

    A quality control and assurance department was established on the Dukovany nuclear power plant site as a unit independent of the production divisions of the plant. Its responsibility consists in testing activities including the development of testing techniques and cooperation in the compilation of specifications and binding technological regulations. The department consists of five sections. The concrete laying laboratory has a staff of 7 and concentrates on testing the quality of concrete mixes and their components in the central concrete production plant. The materials testing centre with a staff of 5 provides testing of steel and special structures and oversees the laying of heavy and very heavy concretes. A separate unit for the testing of surface finish of building structures is staffed with 4 people. The section of technological checks of building and assembly work with a staff of 4 is responsible for the quality of work in the main production unit zone but also of the other buildings on the site. Two people staff the unit for checking and filing the quality control documents for selected components. (Z.M.)

  15. Construction of scales to measure leadership behaviors at nuclear power plants. 3

    International Nuclear Information System (INIS)

    Misumi, Jyuji; Yamada, Akira; Shinohara, Shinobu

    1994-01-01

    In this study, we studied the relationship between organizational commitment (Sekimoto, et al, 1985, 1986) and leadership, and 'morale'-(satisfaction, etc.) using employees working at nuclear power plants as subjects as part of organizational climates. As a result of the Quantification III and Multiple Regression analysis, it became clear that organizational commitment is related to personal factors in 'morale'. Above all, it was suggested that the traditional organizational commitment characterized by relying on companies, such as a desire to stay with the companies, voluntary motivation and internalization of companies' values is higher according to the degree of their satisfaction with the companies and motivation toward work. With regard to self-interest-oriented organizational commitment, the more they are dissatisfied with personal factors in 'morale', the stronger their self-interest-oriented organizational commitment is. In ANOVA using leadership types as independent variable, it was found that leadership types are significantly effective, depending on the degree of the traditional or company-reliant organizational commitment, namely, those employees who perceive their superiors to be of PM type have higher organizational commitment. In our analysis of subcontractors' employees, it was found that their self-interested-oriented organizational commitment was the lowest under leaders of PM type. From these results, it became clear that the degree of organizational commitment varies, depending on the leadership types of their supervisors. (author)

  16. Design and construction of a calorimeter for the measurement of radiation doses in a nuclear reactor

    International Nuclear Information System (INIS)

    Lugo R, J.F.

    1979-01-01

    The amount of energy deposited by the radiation in an absorber system, in radiation dose units was established, the Reactor Triga Mark III core of the Mexican Nuclear Center was used as radiation source. The calorimetric method was used, which gives us a direct measurement in energy units. The total dose was measured, that is, no difference was made between the different forms of radiation that operate with the system. A calorimeter was made with the following materials: stainless steel jacket, aluminium absorber material and thermometers of iron alloy. The calibration system was made for the heating and cooling technique, obtaining with the experimental data the value of the pseudo period constant. With that value and using the fit derived equation, the dose values were established for the G-21 position of the reactor core. It was established that the obtained dose is a function of the operation reactor time before the measurement, at the same a lot of propositions are presented in order to improve this technique, as for the used materials as to the obtaining the most fit equations. A comparison was made between the theoretical calculated dose and the experimentally obtained data with the calorimetric technique. (author)

  17. Composition of Radioactive Aerosols in the Shelter Construction of the Chernobyl Nuclear Power Plant in 2000-2015

    Science.gov (United States)

    Ogorodnikov, B. I.

    2018-06-01

    The results of the physicochemical studies of radioactive aerosols inside and outside the Shelter construction at the Arch construction stage of the Chernobyl Nuclear Power Plant (ChNPP) in 2000-2015 were presented. The dominant isotopes were shown to be cesium, strontium, americium, plutonium, and uranium. They are carried by disperse particles of 2-7 μm. In subreactor rooms, in particular, 012/7, the composition of aerosols is affected by the erosion of the fuel-containing mass formed in 1986. Submicron cesium carrier aerosols appear as a result of evaporation and condensation during fires and welding works. Radiocesium is a well-soluble component of aerosols, while plutonium isotopes are not readily soluble components. In several rooms, the contents of radon, thoron, and their daughter products exceeded the permissible values. In April-June 2011, the intake of radionuclides from the accident at the Japanese Fukushima-1 NPP, which had AMAD of 0.5 μm, was detected and tracked using Petryanov multilayer filters. The productivity of filtration units under the dusty conditions in the exclusion zone of ChNPP and in fogs and haze was investigated. Hydrophilic prefilters with 7-10 μm fibers were recommended.

  18. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

  19. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications

  20. Anchorage of equipment - requirements and verification methods with emphasis on equipment of existing and constructed VVER-type nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.

    1999-01-01

    Criteria and verification methods which are recommended for use in the capacity evaluation of anchorage of safety-related equipment at WWER-type nuclear power plants are presented. Developed in compliance with the relevant basic standards documents specifically for anchorage of WWER-type equipment components, the criteria and methods cover different types of anchor bolts and other anchorage elements which are typical of existing, constructed, or reconstructed WWER-type nuclear power plants