WorldWideScience

Sample records for components contract research

  1. Performance-Driven Interface Contract Enforcement for Scientific Components

    Energy Technology Data Exchange (ETDEWEB)

    Dahlgren, Tamara Lynn [Univ. of California, Davis, CA (United States)

    2008-01-01

    Performance-driven interface contract enforcement research aims to improve the quality of programs built from plug-and-play scientific components. Interface contracts make the obligations on the caller and all implementations of the specified methods explicit. Runtime contract enforcement is a well-known technique for enhancing testing and debugging. However, checking all of the associated constraints during deployment is generally considered too costly from a performance stand point. Previous solutions enforced subsets of constraints without explicit consideration of their performance implications. Hence, this research measures the impacts of different interface contract sampling strategies and compares results with new techniques driven by execution time estimates. Results from three studies indicate automatically adjusting the level of checking based on performance constraints improves the likelihood of detecting contract violations under certain circumstances. Specifically, performance-driven enforcement is better suited to programs exercising constraints whose costs are at most moderately expensive relative to normal program execution.

  2. Validating Timed Component Contracts

    DEFF Research Database (Denmark)

    Le Guilly, Thibaut; Liu, Shaoying; Olsen, Petur

    2015-01-01

    This paper presents a technique for testing software components with contracts that specify functional behavior, synchronization, as well as timing behavior. The approach combines elements from unit testing with model-based testing techniques for timed automata. The technique is implemented...... in an online testing tool, and we demonstrate its use on a concrete use case....

  3. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  4. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  5. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  6. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  7. Process Improvement for Interinstitutional Research Contracting.

    Science.gov (United States)

    Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca

    2015-08-01

    Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.

  8. IAEA research contracts. First annual report

    International Nuclear Information System (INIS)

    1961-01-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation

  9. IAEA research contracts. First annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-07-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation.

  10. Legal Considerations for International Collaborative Research Contract

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Kim, H. J.; Lee, J. H.

    2007-01-01

    Though collaborative research is pure academic activity the research plan and resource allocation for the research are shaped under foam of contract. Thus, legal binding effect and compulsive instrument is adopted at the research contract. This paper aimed at guiding equal collaborative research contract in legal aspect. To reach the goal (1) enforceability and elements of international collaborative contract, (2) damage calculation and related issues with those topics shall be discussed in each section

  11. CONTRACTING AND ERUPTING COMPONENTS OF SIGMOIDAL ACTIVE REGIONS

    International Nuclear Information System (INIS)

    Liu Rui; Wang Yuming; Liu Chang; Wang Haimin; Török, Tibor

    2012-01-01

    It has recently been noted that solar eruptions can be associated with the contraction of coronal loops that are not involved in magnetic reconnection processes. In this paper, we investigate five coronal eruptions originating from four sigmoidal active regions, using high-cadence, high-resolution narrowband EUV images obtained by the Solar Dynamic Observatory (SDO). The magnitudes of the flares associated with the eruptions range from GOES class B to class X. Owing to the high-sensitivity and broad temperature coverage of the Atmospheric Imaging Assembly (AIA) on board SDO, we are able to identify both the contracting and erupting components of the eruptions: the former is observed in cold AIA channels as the contracting coronal loops overlying the elbows of the sigmoid, and the latter is preferentially observed in warm/hot AIA channels as an expanding bubble originating from the center of the sigmoid. The initiation of eruption always precedes the contraction, and in the energetically mild events (B- and C-flares), it also precedes the increase in GOES soft X-ray fluxes. In the more energetic events, the eruption is simultaneous with the impulsive phase of the nonthermal hard X-ray emission. These observations confirm that loop contraction is an integrated process in eruptions with partially opened arcades. The consequence of contraction is a new equilibrium with reduced magnetic energy, as the contracting loops never regain their original positions. The contracting process is a direct consequence of flare energy release, as evidenced by the strong correlation of the maximal contracting speed, and strong anti-correlation of the time delay of contraction relative to expansion, with the peak soft X-ray flux. This is also implied by the relationship between contraction and expansion, i.e., their timing and speed.

  12. Contract Research, the University, and the Academic.

    Science.gov (United States)

    Crawshaw, Bruce

    1985-01-01

    Implications of the growth of university-based contract research are examined, including moral and ethical issues, legal aspects, ownership of research results, staff rights, researcher status, publication, authority, responsibility, social justice, and conflicts between teaching and research. Eleven suggestions for successful contract research…

  13. Contracting in vivo research: what are the issues?

    Science.gov (United States)

    Underwood, Wendy J

    2007-07-01

    As a result of increasing internal and external pressures, research institutions are using contract research organizations for the conduct of in vivo research. Many issues arise when contracting animal research, including concern regarding animal health and welfare. Each sponsor institution should develop a program for outsourced in vivo research that evaluates and ensures appropriate care and use of research animals. Each sponsoring institution should consider establishing a policy and procedure for how outsourced in vivo studies will be approved, conducted, and monitored. An approved list of contract facilities can be established on the basis of accepted standards for animal care and use. Written contracts should include confidentiality agreements, the delineation of animal ownership, and the expectation to comply with all applicable regulations and guidelines for research animal care and use. Finally, a process for communication of adverse study or animal welfare events should be established. Thorough evaluation of contract organizations will help ensure appropriate research animal care and use.

  14. IAEA research contracts. Seventh annual report

    International Nuclear Information System (INIS)

    1967-01-01

    This volume is the seventh annual report and presents full summaries of 52 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1966. Including these, a total of 188 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  15. IAEA research contracts. Sixth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-04-01

    This volume is the sixth annual report and presents full summaries of 37 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1965. Including these, a total of 136 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology.

  16. IAEA research contracts. Seventh annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1967-05-01

    This volume is the seventh annual report and presents full summaries of 52 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1966. Including these, a total of 188 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  17. IAEA research contracts. Sixth annual report

    International Nuclear Information System (INIS)

    1966-01-01

    This volume is the sixth annual report and presents full summaries of 37 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1965. Including these, a total of 136 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology

  18. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  19. 48 CFR 46.309 - Research and development contracts (short form).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Research and development... REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.309 Research and development contracts... Development (Short Form), in solicitations and contracts for research and development when the clause...

  20. 48 CFR 970.35 - Research and development contracting.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Research and development... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and development contracting. ...

  1. 48 CFR 235.070-1 - Indemnification under research and development contracts.

    Science.gov (United States)

    2010-10-01

    ... research and development contracts. 235.070-1 Section 235.070-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.070-1 Indemnification under research and development contracts. (a...

  2. Artificial heart thermal converter component research and development

    International Nuclear Information System (INIS)

    Goldowsky, M.; Lehrfeld, D.

    1977-01-01

    Under U.S. ERDA contract, a radioisotope powered artificial heart system to be used as a replacement for the diseased natural heart is under development by the Westinghouse Advanced Energy Systems Division and Philips Laboratories. A portion of the program activity is in research and development of components for the Stirling cycle thermal converter. Developments in current areas of thermal converter R and D investigation are discussed, including the control system, lubrication system, magnetic shaft coupling, rotary seals, and materials joining

  3. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  4. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  5. 48 CFR 46.307 - Fixed-price research and development contracts.

    Science.gov (United States)

    2010-10-01

    ... REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.307 Fixed-price research and development... Development—Fixed-Price, in solicitations and contracts for research and development when (1) the primary... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Fixed-price research and...

  6. 48 CFR 46.308 - Cost-reimbursement research and development contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement... ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.308 Cost-reimbursement... of Research and Development—Cost-Reimbursement, in solicitations and contracts for research and...

  7. 48 CFR 252.244-7000 - Subcontracts for Commercial Items and Commercial Components (DoD Contracts).

    Science.gov (United States)

    2010-10-01

    ... under this contract: (a) 252.225-7009 Restriction on Acquisition of Certain Articles Containing... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontracts for Commercial Items and Commercial Components (DoD Contracts). 252.244-7000 Section 252.244-7000 Federal...

  8. Electromechanical delay components during skeletal muscle contraction and relaxation in patients with myotonic dystrophy type 1.

    Science.gov (United States)

    Esposito, Fabio; Cè, Emiliano; Rampichini, Susanna; Limonta, Eloisa; Venturelli, Massimo; Monti, Elena; Bet, Luciano; Fossati, Barbara; Meola, Giovanni

    2016-01-01

    The electromechanical delay during muscle contraction and relaxation can be partitioned into mainly electrochemical and mainly mechanical components by an EMG, mechanomyographic, and force combined approach. Component duration and measurement reliability were investigated during contraction and relaxation in a group of patients with myotonic dystrophy type 1 (DM1, n = 13) and in healthy controls (n = 13). EMG, mechanomyogram, and force were recorded in DM1 and in age- and body-matched controls from tibialis anterior (distal muscle) and vastus lateralis (proximal muscle) muscles during maximum voluntary and electrically-evoked isometric contractions. The electrochemical and mechanical components of the electromechanical delay during muscle contraction and relaxation were calculated off-line. Maximum strength was significantly lower in DM1 than in controls under both experimental conditions. All electrochemical and mechanical components were significantly longer in DM1 in both muscles. Measurement reliability was very high in both DM1 and controls. The high reliability of the measurements and the differences between DM1 patients and controls suggest that the EMG, mechanomyographic, and force combined approach could be utilized as a valid tool to assess the level of neuromuscular dysfunction in this pathology, and to follow the efficacy of pharmacological or non-pharmacological interventions. Copyright © 2015 Elsevier B.V. All rights reserved.

  9. Stimulation of Research in Biomedicine. Role of Effective Contract.

    Science.gov (United States)

    Aleksandrova, N V; Shkolnikova, M A; Dlin, V V; Yugay, M T

    Analysis of publication activity in the field of biomedicine shows insignificant input of Russia in the world scientific product. This is largely due to the lack of incentives for researchers. Article describes stimulation of researchers in Russia, compares it with foreign models, formulates main shortcomings of support and stimulation of research in Russia and introduces the concept of effective contract. Development of personnel motivation and stimulation of employees of scientific and research organizations in the field of health. As a successful experience the article describes the implementation of effective contract in Veltishev Research and Clinical Institute for Pediatrics where for years remuneration of researchers depended upon their positions without consideration of research results. Effective contract brought significant changes in the traditional system setting new performance and efficiency criteria. New evaluation system took into account publication activity, presentation activity, implementation of research results, raising scientific personnel, thesis work and income-generating activities. Introduction of effective contract already in the second year led to a rise in the number of foreign publications, publications in journals with impact factor of more than 2, the general increase in the number of articles in peer-reviewed journals with impact factor more than 0.3, the growth of the number of articles by 1 researcher, Hirsch index improving both by individual employees and the entire Institute, increase of grant activity and presentation activity at top-rated professional congresses. The growth of publication and presentation activities has been achieved at the reduction of research staff by 23%. From financial viewpoint effective contract resulted in the redistribution of resources in favour of more efficient researchers. The introduction of effective contract and increase of requirements for scientific output did not cause resistance of staff

  10. IAEA research contracts. Ninth annual report

    International Nuclear Information System (INIS)

    1969-01-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  11. IAEA research contracts. Ninth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1969-06-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  12. Aspects of research and development contract terms in the bio/pharmaceutical sector.

    Science.gov (United States)

    Banerjee, Tannista

    2012-01-01

    The cost of new drug development is increasing every year. Pharmaceutical companies use R&D joint ventures, mergers, and outsource different stages of pharmaceutical R&D activities for a faster and cost minimizing method of innovation. Pharmaceutical companies outsource R&D activities to independent small biotech or pharmaceutical companies that specialize in different stages of pharmaceutical R&D. This chapter examines the determinants of the payment structure of research contracts between large bio/pharmaceutical companies and specialized research firms. Determinants of R&D contracts are analyzed using detailed R&D contract data between bio/pharmaceutical companies and independent research firms for 10 years. A multinomial logit model is used in order to understand the determinants of three different types of contracts; royalty contracts, fixed payment contracts, and the mixed contracts. Under uncertainty, the likelihood of a royalty contract rises for the early stages of the research and with the patent stock of the research firm. It is more likely to observe both royalty and fixed payment if the pharmaceutical client has past contracts with the same research firm. The results also suggest that if Food and Drug Administration (FDA) is more stringent in any disease area in reviewing the new drug application, then the likelihood of signing pure royalty contract decreases. Understanding the nature of R&D contracts and the effects of FDA's behavior on the pharmaceutical R&D contract is important because these contracts not only affect the cost of new drug invention but also the quality and the rate of invention. VALUE: Results are useful for both the pharmaceutical companies and the economic/business researchers.

  13. IAEA research contracts. Fifth annual report

    International Nuclear Information System (INIS)

    1965-01-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  14. IAEA research contracts. Fifth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-04-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  15. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Myung Ho; Lee, Eui Jin [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  16. Review on Overseas Contracts of a Nuclear Research Institute in Korea

    International Nuclear Information System (INIS)

    Lee, Myung Ho; Lee, Eui Jin

    2010-01-01

    Since its establishment, Korea Atomic Energy Research Institute (KAERI) has made various contracts in research, design, engineering and consultation with a lot of foreign counterparts all over the world, including international organizations. As one of the global nuclear energy research leaders, KAERI can make a large scale contract because it has already procured a turnkey EPC (Engineering, Procurement, Construction) contract for a research and training reactor in the spring of 2010 by forming a consortium with a construction and engineering company. A contract in nuclear business industries is to be made under the limited control of regulatory authorities because the contractors must ensure nuclear safety and follow the international nuclear non-proliferation guidelines to secure the peaceful use of nuclear energy at an international level. The export and import of strategic technologies, products or materials (including nuclear materials) must be directly controlled by the authorities in accordance with the applicable law. In 2009, KAERI organized a new team to manage the overseas contracts and to make the limited control reflected in the contract documentation. In large scale project contracts, more attention shall be given to the contracts to prevent claims and also to the consideration of the regulatory requirements. In this context, the nature of the past KAERI contracts was reviewed. The conditions of several recent KAERI contracts were also individually reviewed based on the FIDIC (Federation Internationale des Ingenieurs-Conseils) model service agreement, which is generally accepted by service contractors. Ways to increase the quality of future contracts and to improve the standard model agreement which is used to prepare the draft contract were also considered

  17. 21 CFR 312.52 - Transfer of obligations to a contract research organization.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Transfer of obligations to a contract research... and Investigators § 312.52 Transfer of obligations to a contract research organization. (a) A sponsor may transfer responsibility for any or all of the obligations set forth in this part to a contract...

  18. DOE's foreign research reactor transportation services contract: Perspective and experience

    International Nuclear Information System (INIS)

    Patterson, John

    1997-01-01

    DOE committed to low- and moderate-income countries participating in the foreign research reactor spent fuel returns program that the United States government would provide for the transportation of the spent fuel. In fulfillment of that commitment, DOE entered into transportation services contracts with qualified, private-sector firms. NAC will discuss its experience as a transportation services provider, including range of services available to the foreign reactors, advantages to DOE and to the foreign research reactors, access to contract services by high income countries and potential advantages, and experience with initial tasks performed under the contract. (author)

  19. Stac3 is a component of the excitation-contraction coupling machinery and mutated in Native American myopathy

    Science.gov (United States)

    Horstick, Eric J.; Linsley, Jeremy W.; Dowling, James J.; Hauser, Michael A.; McDonald, Kristin K.; Ashley-Koch, Allison; Saint-Amant, Louis; Satish, Akhila; Cui, Wilson W.; Zhou, Weibin; Sprague, Shawn M.; Stamm, Demetra S.; Powell, Cynthia M.; Speer, Marcy C.; Franzini-Armstrong, Clara; Hirata, Hiromi; Kuwada, John Y.

    2013-01-01

    Excitation-contraction coupling, the process that regulates contractions by skeletal muscles, transduces changes in membrane voltage by activating release of Ca2+ from internal stores to initiate muscle contraction. Defects in EC coupling are associated with muscle diseases. Here we identify Stac3 as a novel component of the EC coupling machinery. Using a zebrafish genetic screen, we generate a locomotor mutation that is mapped to stac3. We provide electrophysiological, Ca2+ imaging, immunocytochemical and biochemical evidence that Stac3 participates in excitation-contraction coupling in muscles. Furthermore, we reveal that a mutation in human STAC3 as the genetic basis of the debilitating Native American myopathy (NAM). Analysis of NAM stac3 in zebrafish shows that the NAM mutation decreases excitation-contraction coupling. These findings enhance our understanding of both excitation-contraction coupling and the pathology of myopathies. PMID:23736855

  20. Guidelines for cost control and analysis of cost-type research and development contracts

    Science.gov (United States)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  1. Contract employment policy and research productivity of knowledge workers: An analysis of Spanish universities

    OpenAIRE

    Lafuente González, Esteban Miguel; Berbegal-Mirabent, Jasmina

    2017-01-01

    This article investigates how contract employment practices adopted by universities—fixed-term contracts and permanent contracts—impact research productivity measured in terms of publications in scholarly journals. The empirical application considers the Spanish public higher education system for the period 2002-2008. We report an inverse U-shaped relationship between the rate fixed-term contracts and the research productivity of Spanish universities. That is, contract policies based on fixed...

  2. United States private-sector physicians and pharmaceutical contract research: a qualitative study.

    Science.gov (United States)

    Fisher, Jill A; Kalbaugh, Corey A

    2012-01-01

    There have been dramatic increases over the past 20 years in the number of nonacademic, private-sector physicians who serve as principal investigators on US clinical trials sponsored by the pharmaceutical industry. However, there has been little research on the implications of these investigators' role in clinical investigation. Our objective was to study private-sector clinics involved in US pharmaceutical clinical trials to understand the contract research arrangements supporting drug development, and specifically how private-sector physicians engaged in contract research describe their professional identities. We conducted a qualitative study in 2003-2004 combining observation at 25 private-sector research organizations in the southwestern United States and 63 semi-structured interviews with physicians, research staff, and research participants at those clinics. We used grounded theory to analyze and interpret our data. The 11 private-sector physicians who participated in our study reported becoming principal investigators on industry clinical trials primarily because contract research provides an additional revenue stream. The physicians reported that they saw themselves as trial practitioners and as businesspeople rather than as scientists or researchers. Our findings suggest that in addition to having financial motivation to participate in contract research, these US private-sector physicians have a professional identity aligned with an industry-based approach to research ethics. The generalizability of these findings and whether they have changed in the intervening years should be addressed in future studies. Please see later in the article for the Editors' Summary.

  3. United States private-sector physicians and pharmaceutical contract research: a qualitative study.

    Directory of Open Access Journals (Sweden)

    Jill A Fisher

    Full Text Available There have been dramatic increases over the past 20 years in the number of nonacademic, private-sector physicians who serve as principal investigators on US clinical trials sponsored by the pharmaceutical industry. However, there has been little research on the implications of these investigators' role in clinical investigation. Our objective was to study private-sector clinics involved in US pharmaceutical clinical trials to understand the contract research arrangements supporting drug development, and specifically how private-sector physicians engaged in contract research describe their professional identities.We conducted a qualitative study in 2003-2004 combining observation at 25 private-sector research organizations in the southwestern United States and 63 semi-structured interviews with physicians, research staff, and research participants at those clinics. We used grounded theory to analyze and interpret our data. The 11 private-sector physicians who participated in our study reported becoming principal investigators on industry clinical trials primarily because contract research provides an additional revenue stream. The physicians reported that they saw themselves as trial practitioners and as businesspeople rather than as scientists or researchers.Our findings suggest that in addition to having financial motivation to participate in contract research, these US private-sector physicians have a professional identity aligned with an industry-based approach to research ethics. The generalizability of these findings and whether they have changed in the intervening years should be addressed in future studies. Please see later in the article for the Editors' Summary.

  4. The U.S. Public's Investment in Medical Research: An Evolving Social Contract.

    Science.gov (United States)

    Heinig, Stephen J; Dev, Anurupa; Bonham, Ann C

    2016-01-01

    Medical researchers and their institutions are operating under extraordinary financial stress. More than a decade after completion of the 5-year doubling of the National Institutes of Health budget, the medical research community must confront a significant loss in National Institutes of Health purchasing power and downward pressures in federal discretionary spending. In part, this trend results from a federal budget stalemate over the growth in entitlement programs, particularly spending on medical care. This article considers the changing nature of the federal investment in medical research and the potential for medical researchers and institutions conducting the full spectrum of research to improve health system performance and health equity. In our view, continued federal investments reflect an evolving social contract for research serving the public good; the term contract is used metaphorically to represent a figurative, implicit agreement between the scientific community and the public's representatives in government. Under this conceptual contract, the American people--who are ultimately the funders of research, research training and infrastructure--expect outcomes that lead to better health, security or other benefits. The evolving contract includes expectations for more accountability, transparency, sharing of results and resources, and better integration of research systems and cultures that used to take pride in boundaries and distinctions. We outline here some of the major movements of organizations realigning to social support, which are increasingly essential to sustain public investment in medical research. Copyright © 2016 Southern Society for Clinical Investigation. Published by Elsevier Inc. All rights reserved.

  5. Use of Federal Acquisition Regulation. Part 12. Contracts for Applied Research

    National Research Council Canada - National Science Library

    2001-01-01

    ...) Part 12, "Acquisition of Commercial Items,"contracts for acquiring applied research. Applied research involves the scientific efforts to translate basic research into solutions for broadly defined military needs...

  6. Contract Req Detailed Design Report Version 1: A C-BASS Component Contract Req Detailed Design Report Version 1: A C-BASS Component

    National Research Council Canada - National Science Library

    McGurin, Denis

    1999-01-01

    .... As part of the Corporate Business Application Software System (C-BASS) suite of work flow applications, Contract Req automates preparation of a requestor's procurement package as part of the contracting process for the U.S...

  7. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  8. Listing of engineering research contract reports under the DREAM, AERD and ERDAF programs of the Research Branch, 1973-1988

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, B A; Thuns, A; Feldman, M

    1988-01-01

    To supplement in-house investigations, Agriculture Canada contracted out research in a number of programs including three which supported engineering work. This document lists the contracts awarded under the programs and provides reference citations of the contract reports. Reports are grouped by file number, scientific authority, author or contractor, and subject, and a subject index is also included. The three programs are: Development, Research and Evaluation in Agricultural Mechanization (DREAM), Agricultural Engineering Research and Development Program (AERD), and Energy Research and Development in Agriculture and Food (ERDAF). AERD, which replaced DREAM, has been terminated, but the ERDAF program is still continuing as of the date of this document.

  9. Collaborative Research: The Alphabetic Braille and Contracted Braille Study as an Example of Collaborative Research

    Science.gov (United States)

    Wormsley, Diane P.; Emerson, Robert Wall; Erin, Jane

    2011-01-01

    This article examines the Alphabetic Braille Contracted Braille Study in relation to the dimensions of collaborative research: extent, intensity, substance, heterogeneity, velocity, formality, and productivity. It also discusses the dimensions of financing research and researchers' attitudes. The overall consensus is that the study would not have…

  10. University Research and Development Activities: The Federal Income Tax Consequences of Research Contracts, Research Subsidiaries and Joint Ventures.

    Science.gov (United States)

    Kertz, Consuelo Lauda; Hasson, James K., Jr.

    1986-01-01

    Features of the federal income tax law applying to income received from commercially funded university-based scientific research and development activities are discussed, including: industry-sponsored research contracts, separately incorporated entities, partnerships and joint ventures, subsidiaries and unrelated income consequences of…

  11. Development through science: The IAEA research contract programme

    International Nuclear Information System (INIS)

    Benson Wiltschegg, T.; Gillen, V.

    1991-01-01

    The IAEA strives to stimulate the growth of science in developing countries by assuring that the IAEA and the scientific communities of developed and developing countries share their knowledge and experience. If the assistance provided is well organized and in keeping with the needs of developing countries it can make the crucial difference in sustainable development. This booklet provides a survey of the historical development of the IAEA's Research Contract Programme and outlines the aims and achievements of selected Co-ordinated Research Programmes. A complete listing of Co-ordinated Research Programmes is provided

  12. 48 CFR 53.235 - Research and Development Contracting (SF 298).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Research and Development Contracting (SF 298). 53.235 Section 53.235 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.235 Research and Development...

  13. Contracting out maintenance and a plan for future research

    NARCIS (Netherlands)

    Martin, H.H.

    1997-01-01

    Presents a discussion of the research survey carried out at the Faculty of Technology Management at the Eindhoven University of Technology concerning contractors’ maintenance. First, gives a brief introduction to the emerging contracting out phenomenon in The Netherlands. Then, provides an overview

  14. 48 CFR 227.7204 - Contracts under the Small Business Innovative Research Program.

    Science.gov (United States)

    2010-10-01

    ... Business Innovative Research Program. 227.7204 Section 227.7204 Federal Acquisition Regulations System... under the Small Business Innovative Research Program. When contracting under the Small Business Innovative Research Program, follow the procedures at 227-7104. ...

  15. The Research Contract Programme annual report and statistics for 2000

    International Nuclear Information System (INIS)

    2001-06-01

    53 Coordinated Research Projects (CRPs) were completed in 2000. 38 of these CRPs concerned topics in Nuclear Sciences and Applications and 15 were related to nuclear energy and safety. These CRPs were funded for $9,275,648; the average annual cost per CRP was $38,892. A list of these CRPs is included. Evaluations of these CRPs will be completed by the end of 2001 and included in the next annual report. The Agency's unique position as a technical international organization has enabled it to act as an international platform to lead groups of nuclear scientists by co-ordinating research and developmental activities addressing important problems in Member States. CRPs have been used to transfer existing technologies to developing countries, as well as for the development of new technologies in those countries. Since CRPs are tailored to finding solutions to specific problems, as compared to general techniques, their potential value in terms of the effect on Member States' level of development is substantial. In an effort to further enhance the effectiveness of CRPs developed and coordinated by the Agency, various initiatives have been suggested and the Research Contract Programme has been the subject of several advisory fora. The PPAS of Major Programme 2, the Senior Evaluation Group (SEG), and an internal audit of the programme have recently made recommendations to this end. Based on these reviews, the Agency has begun to fund fewer, but better focused and more substantially funded CRPs. Whereas in 1999, the Agency was carrying out 159 CRPs, 132 CRPs were carried out in 2000. The average annual amount of funding available per CRP during this period increased by 14%, from US $47,500 in 1999 to US $ 54,000 in 2000. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear

  16. The Research Contract Programme annual report and statistics for 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-15

    53 Coordinated Research Projects (CRPs) were completed in 2000. 38 of these CRPs concerned topics in Nuclear Sciences and Applications and 15 were related to nuclear energy and safety. These CRPs were funded for $9,275,648; the average annual cost per CRP was $38,892. A list of these CRPs is included. Evaluations of these CRPs will be completed by the end of 2001 and included in the next annual report. The Agency's unique position as a technical international organization has enabled it to act as an international platform to lead groups of nuclear scientists by co-ordinating research and developmental activities addressing important problems in Member States. CRPs have been used to transfer existing technologies to developing countries, as well as for the development of new technologies in those countries. Since CRPs are tailored to finding solutions to specific problems, as compared to general techniques, their potential value in terms of the effect on Member States' level of development is substantial. In an effort to further enhance the effectiveness of CRPs developed and coordinated by the Agency, various initiatives have been suggested and the Research Contract Programme has been the subject of several advisory fora. The PPAS of Major Programme 2, the Senior Evaluation Group (SEG), and an internal audit of the programme have recently made recommendations to this end. Based on these reviews, the Agency has begun to fund fewer, but better focused and more substantially funded CRPs. Whereas in 1999, the Agency was carrying out 159 CRPs, 132 CRPs were carried out in 2000. The average annual amount of funding available per CRP during this period increased by 14%, from US $47,500 in 1999 to US $ 54,000 in 2000. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear

  17. Component fragility research program

    International Nuclear Information System (INIS)

    Tsai, N.C.; Mochizuki, G.L.; Holman, G.S.

    1989-11-01

    To demonstrate how ''high-level'' qualification test data can be used to estimate the ultimate seismic capacity of nuclear power plant equipment, we assessed in detail various electrical components tested by the Pacific Gas ampersand Electric Company for its Diablo Canyon plant. As part of our Phase I Component Fragility Research Program, we evaluated seismic fragility for five Diablo Canyon components: medium-voltage (4kV) switchgear; safeguard relay board; emergency light battery pack; potential transformer; and station battery and racks. This report discusses our Phase II fragility evaluation of a single Westinghouse Type W motor control center column, a fan cooler motor controller, and three local starters at the Diablo Canyon nuclear power plant. These components were seismically qualified by means of biaxial random motion tests on a shaker table, and the test response spectra formed the basis for the estimate of the seismic capacity of the components. The seismic capacity of each component is referenced to the zero period acceleration (ZPA) and, in our Phase II study only, to the average spectral acceleration (ASA) of the motion at its base. For the motor control center, the seismic capacity was compared to the capacity of a Westinghouse Five-Star MCC subjected to actual fragility tests by LLNL during the Phase I Component Fragility Research Program, and to generic capacities developed by the Brookhaven National Laboratory for motor control center. Except for the medium-voltage switchgear, all of the components considered in both our Phase I and Phase II evaluations were qualified in their standard commercial configurations or with only relatively minor modifications such as top bracing of cabinets. 8 refs., 67 figs., 7 tabs

  18. Into the Looking Glass: Psychological Contracts in Research Administration

    Science.gov (United States)

    Hicks, Melanie; Monroy-Paz, Jorge

    2015-01-01

    In a world of fast moving technology, pressure cooker work climates and stretched resources, productivity, employee engagement, and talent retention are critical to the success of any organization. Research administration offices are no exception. Psychological contract theory provides insightful illumination on reactions to these environments by…

  19. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  20. EMG-Torque Dynamics Change With Contraction Bandwidth.

    Science.gov (United States)

    Golkar, Mahsa A; Jalaleddini, Kian; Kearney, Robert E

    2018-04-01

    An accurate model for ElectroMyoGram (EMG)-torque dynamics has many uses. One of its applications which has gained high attention among researchers is its use, in estimating the muscle contraction level for the efficient control of prosthesis. In this paper, the dynamic relationship between the surface EMG and torque during isometric contractions at the human ankle was studied using system identification techniques. Subjects voluntarily modulated their ankle torque in dorsiflexion direction, by activating their tibialis anterior muscle, while tracking a pseudo-random binary sequence in a torque matching task. The effects of contraction bandwidth, described by torque spectrum, on EMG-torque dynamics were evaluated by varying the visual command switching time. Nonparametric impulse response functions (IRF) were estimated between the processed surface EMG and torque. It was demonstrated that: 1) at low contraction bandwidths, the identified IRFs had unphysiological anticipatory (i.e., non-causal) components, whose amplitude decreased as the contraction bandwidth increased. We hypothesized that this non-causal behavior arose, because the EMG input contained a component due to feedback from the output torque, i.e., it was recorded from within a closed-loop. Vision was not the feedback source since the non-causal behavior persisted when visual feedback was removed. Repeating the identification using a nonparametric closed-loop identification algorithm yielded causal IRFs at all bandwidths, supporting this hypothesis. 2) EMG-torque dynamics became faster and the bandwidth of system increased as contraction modulation rate increased. Thus, accurate prediction of torque from EMG signals must take into account the contraction bandwidth sensitivity of this system.

  1. Component Fragility Research Program: Phase 1 component prioritization

    International Nuclear Information System (INIS)

    Holman, G.S.; Chou, C.K.

    1987-06-01

    Current probabilistic risk assessment (PRA) methods for nuclear power plants utilize seismic ''fragilities'' - probabilities of failure conditioned on the severity of seismic input motion - that are based largely on limited test data and on engineering judgment. Under the NRC Component Fragility Research Program (CFRP), the Lawrence Livermore National Laboratory (LLNL) has developed and demonstrated procedures for using test data to derive probabilistic fragility descriptions for mechanical and electrical components. As part of its CFRP activities, LLNL systematically identified and categorized components influencing plant safety in order to identify ''candidate'' components for future NRC testing. Plant systems relevant to safety were first identified; within each system components were then ranked according to their importance to overall system function and their anticipated seismic capacity. Highest priority for future testing was assigned to those ''very important'' components having ''low'' seismic capacity. This report describes the LLNL prioritization effort, which also included application of ''high-level'' qualification data as an alternate means of developing probabilistic fragility descriptions for PRA applications

  2. Review of the research contract programs in the field of nuclear science and technology (1959-1979)

    Energy Technology Data Exchange (ETDEWEB)

    Bonoan, L S; Marasigan, C J; Relunia, E D [Philippine Atomic Energy Commission, Diliman, Quezon City

    1982-01-01

    This paper presents the 20 year span of cooperative services in the form of research contracts availed of by the country with the International Atomic Energy Agency (IAEA). All research contract grants are placed under the direct supervision of educational institutions, industrial laboratories, research centers and other institutions on areas of direct interest of the Agency's work. These areas are generally in the field of: life sciences with emphasis on medical and agricultural applications, radiation biology; nuclear safety; environmental protection; physical sciences such as physics and chemistry; engineering and technology, with special emphasis on nuclear power. Tables and figures graphically present research contracts grants and field classification.

  3. Emerging trends in contract research industry in India.

    Science.gov (United States)

    Drabu, Sushma; Gupta, Alka; Bhadauria, Anupama

    2010-09-01

    A Contract Research Organization (CRO) is a service organization that provides support to the pharmaceutical industry and offers a wide range of "outsourced" pharmaceutical research services to aid in R&D process and is thus an essential tool for undertaking clinical trials in the present scenario when high stakes are involved in the drug discovery process. This industry also offers a safe option of investment as the industry is largely recession-proof, with a significant upscale growth. Presently India occupies a very small pie of the global market share in the Clinical Trials Industry but it is estimated to conduct nearly 5% of global clinical trials by 2012. The global CRO industry valued $18 bn in 2008 and the market is expected to grow at an annual rate of 14% between 2009 and 13. Top multinational pharmaceuticals companies are venturing into the Indian business, in collaboration with the Indian Drug Companies. According to a recent study by Mckinsey & Company, the Indian Clinical Research Industry can attract $1.5 bn of revenue from US and EU by 2010. Such an increase in outsourcing from the western countries has led the global pharma companies and Indian entrepreneurs to set up Contract Research Organizations (CROs) in India. To bring this into realization and fulfil the market demand, while simultaneously aiding in improving the country's economical standards and market position, joint and well-coordinated efforts on part of the government, industry, and working professionals are needed in terms of regulatory affairs, audits, transparency in work affairs, garnering patient confidence, and pharmacovigilance. Copyright 2010 Elsevier Inc. All rights reserved.

  4. INDEFINITE CONTRACT REVIEW 1999 Procedure for Research Physicists (Professional Category 1)

    CERN Multimedia

    1999-01-01

    In view of the long-standing deliberate turnover policy of professional category 1 research physicists on fixed-term contracts, a special procedure is defined, distinct from the other professional categories. This procedure takes into account that research physicists stay at CERN for only up to 6 years and that periods of service as Fellow may be counted within these six years.The following procedure has been agreed:1.\tThe review covers research physicists holding fixed-term contracts and having completed at least 4 years of service on 30 June 1999. Prior years as Fellow may be taken into consideration in the specific context.\tAll candidates are informed individually.2.\tThe files of all candidates are considered by search committees. The members of the committees are nominated by the Director-General and comprise members of the senior CERN staff as well as at least one senior external physicist. The committees are free to take up references and to interview the candidates.3.\tIn ord...

  5. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  6. 48 CFR 227.7107-2 - Contracts for construction supplies and research and development work.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contracts for construction supplies and research and development work. 227.7107-2 Section 227.7107-2 Federal Acquisition Regulations... PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7107-2 Contracts for construction supplies and...

  7. Contracts, grants and funding summary of supersonic cruise research and variable-cycle engine technology programs, 1972 - 1982

    Science.gov (United States)

    Hoffman, S.; Varholic, M. C.

    1983-01-01

    NASA-SCAR (AST) program was initiated in 1972 at the direct request of the Executive Office of the White House and Congress following termination of the U.S. SST program. The purpose of SCR was to conduct a focused research and technology program on those technology programs which contributed to the SST termination and, also, to provide an expanded data base for future civil and military supersonic transport aircraft. Funding for the Supersonic Cruise Research (SCR) Program was initiated in fiscal year 1973 and terminated in fiscal year 1981. The program was implemented through contracts and grants with industry, universities, and by in-house investigations at the NASA/OAST centers. The studies included system studies and five disciplines: propulsion, stratospheric emissions impact, materials and structures, aerodynamic performance, and stability and control. The NASA/Lewis Variable-Cycle Engine (VCE) Component Program was initiated in 1976 to augment the SCR program in the area of propulsion. After about 2 years, the title was changed to VCE Technology program. The total number of contractors and grantees on record at the AST office in 1982 was 101 for SCR and 4 for VCE. This paper presents a compilation of all the contracts and grants as well as the funding summaries for both programs.

  8. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.

  9. 48 CFR 244.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clause. 244.403... OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 244.403 Contract clause. (1) 252.225-7009, Restriction on Acquisition of...

  10. Smart Contract Templates: foundations, design landscape and research directions

    OpenAIRE

    Clack, Christopher D.; Bakshi, Vikram A.; Braine, Lee

    2016-01-01

    In this position paper, we consider some foundational topics regarding smart contracts (such as terminology, automation, enforceability, and semantics) and define a smart contract as an automatable and enforceable agreement. We explore a simple semantic framework for smart contracts, covering both operational and non-operational aspects, and describe templates and agreements for legally-enforceable smart contracts, based on legal documents. Building upon the Ricardian Contract, we identify op...

  11. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  12. 48 CFR 227.7104 - Contracts under the Small Business Innovation Research (SBIR) Program.

    Science.gov (United States)

    2010-10-01

    ... Business Innovation Research (SBIR) Program. 227.7104 Section 227.7104 Federal Acquisition Regulations... Data and Computer Software—Small Business Innovation Research (SBIR) Program, when technical data or... PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7104 Contracts under the Small Business...

  13. Proposal for the Award of Two Contracts for the Technical Services for Work on Components of CERN Particle Accelerators and High Energy Physics Experiments

    CERN Document Server

    2003-01-01

    This document concerns the award of two contracts for the technical services for work on components of CERN particle accelerators and high energy physics experiments. Following a market survey carried out among 73 firms in fourteen Member States, a call for tenders (IT-3156/SPL) was sent on 4 November 2002 to three consortia in four Member States. By the closing date, CERN had received tenders from the three consortia. The Finance Committee is invited to agree to the negotiation of two contracts with: 1) the consortium SERCO FACILITIES MANAGEMENT (NL) - GERARD PERRIER INDUSTRIE (FR) - INEO ALPES (FR), the lowest bidder, for approximately 55% of the technical services for work on components of CERN particle accelerators and high energy physics experiments, for an initial period of five years and for a total amount not exceeding 37 435 270 euros (54 902 500 Swiss francs), subject to revision for inflation from 1 January 2005. The contract will include options for two one-year extensions beyond the initial five-...

  14. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  15. The Construction of Academic Time: Sub/Contracting Academic Labour in Research.

    Science.gov (United States)

    Hey, Valerie

    2001-01-01

    Offers a poststructuralist analysis of the UK higher education sector's academic division of labor, exploring some new contradictions from a contract researcher's standpoint. Raises political, social, and methodological questions about these divisions by exploring their class and gender dimensions. Too many academics remain silent about adverse…

  16. Big-pharmaceuticalisation: clinical trials and Contract Research Organisations in India.

    Science.gov (United States)

    Sariola, Salla; Ravindran, Deapica; Kumar, Anand; Jeffery, Roger

    2015-04-01

    The World Trade Organisation's Trade Related Intellectual Property Rights [TRIPS] agreement aimed to harmonise intellectual property rights and patent protection globally. In India, the signing of this agreement resulted in a sharp increase in clinical trials since 2005. The Indian government, along with larger Indian pharmaceutical companies, believed that they could change existing commercial research cultures through the promotion of basic research as well as attracting international clinical trials, and thus create an international level, innovation-based drug industry. The effects of the growth of these outsourced and off-shored clinical trials on local commercial knowledge production in India are still unclear. What has been the impact of the increasing scale and commercialisation of clinical research on corporate science in India? In this paper we describe Big-pharmaceuticalisation in India, whereby the local pharmaceutical industry is moving from generic manufacturing to innovative research. Using conceptual frameworks of pharmaceuticalisation and innovation, this paper analyses data from research conducted in 2010-2012 and describes how Contract Research Organisations (CROs) enable outsourcing of randomised control trials to India. Focussing on twenty-five semi-structured interviews CRO staff, we chart the changes in Indian pharmaceutical industry, and implications for local research cultures. We use Big-pharmaceuticalisation to extend the notion of pharmaceuticalisation to describe the spread of pharmaceutical research globally and illustrate how TRIPS has encouraged a concentration of capital in India, with large companies gaining increasing market share and using their market power to rewrite regulations and introduce new regulatory practices in their own interest. Contract Research Organisations, with relevant, new, epistemic skills and capacities, are both manifestations of the changes in commercial research cultures, as well as the vehicles to

  17. 48 CFR 237.104 - Personal services contracts.

    Science.gov (United States)

    2010-10-01

    ... intelligence component or counter-intelligence organization of DoD; or (iii) Directly support the mission of... travel between home or place of business and official duty station. (iii) Coordinate with the civilian... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Service Contracts...

  18. The complexity of collaboration: Opportunities and challenges in contracted research

    Directory of Open Access Journals (Sweden)

    Marion Bowl

    2010-11-01

    Full Text Available This article explores some of the challenges of utilising collaborative research approaches when undertaking contracted research projects for government and non-government agencies in the adult and community education (ACE sector. To discuss these challenges, the article draws on three recent examples of research projects undertaken for ACE sector organisations in Aotearoa New Zealand. These challenges include managing relationships with the different parties to the research; dealing with conflicting expectations of funding agencies, commissioning organisations and practitioners; and ownership and dissemination of findings. We highlight the complexity of notions of collaboration and the importance of deliberate trust-building in establishing credibility. We also open up for discussion the thorny issues of who owns the right to disseminate research findings and how far should researchers’ and universities’ responsibilities extend to ensure that research findings are put in the public domain?

  19. On the Specification of Full Contracts

    DEFF Research Database (Denmark)

    Okika, Joseph; Ravn, Anders Peter; Fenech, Stephen

    2009-01-01

    Contracts specify properties of an interface to a software component. We consider the problem of de ning a full contract that speci es not only the normal behaviour, but also special cases and tolerated exceptions. In this paper we focus on the behavioural properties of use cases taken from...... the Common Component Modelling Example (CoCoME), proposed as a benchmark to compare di erent component models. We rst give the full speci cation of the use cases in the deontic-based speci cation language CL, and then we concentrate on three particular properties in order to compare deontic and operational...

  20. Army Contract Writing System (ACWS)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Information 4 Responsible Office 4 References 4 Program Description 5 Business Case 5 Program Status 6 Schedule 7 Performance...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS

  1. Proposal for the award of a contract for the supply of bake-out heating jackets for the LHC vacuum components

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the supply of bake-out heating jackets for the LHC vacuum components. The Finance Committee is invited to agree to the negotiation of a contract with ELTHERM (DE), the lowest bidder, for the supply of heating jackets for a total amount of 711 567 euros (1 120 646 Swiss francs), not subject to revision, with an option for up to 15% additional heating jackets for an additional amount of up to 106 735 euros (168 097 Swiss francs), not subject to revision, bringing the total amount to 818 302 euros (1 288 743 Swiss francs), not subject to revision. The amounts in Swiss francs have been calculated using the present rate of exchange. 2006/68/5/e

  2. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  3. 77 FR 47797 - Federal Acquisition Regulation; Small Business Set Asides for Research and Development Contracts

    Science.gov (United States)

    2012-08-10

    ... Acquisition Regulation; Small Business Set Asides for Research and Development Contracts AGENCY: Department of... when the market research conducted in accordance with FAR part 10 indicates there are small businesses... officer can proceed with a small business set-aside for research and development. FAR 19.502-2(b...

  4. Modeling Psychological Contract Violation using Dual Regime Models: An Event-based Approach.

    Science.gov (United States)

    Hofmans, Joeri

    2017-01-01

    A good understanding of the dynamics of psychological contract violation requires theories, research methods and statistical models that explicitly recognize that violation feelings follow from an event that violates one's acceptance limits, after which interpretative processes are set into motion, determining the intensity of these violation feelings. Whereas theories-in the form of the dynamic model of the psychological contract-and research methods-in the form of daily diary research and experience sampling research-are available by now, the statistical tools to model such a two-stage process are still lacking. The aim of the present paper is to fill this gap in the literature by introducing two statistical models-the Zero-Inflated model and the Hurdle model-that closely mimic the theoretical process underlying the elicitation violation feelings via two model components: a binary distribution that models whether violation has occurred or not, and a count distribution that models how severe the negative impact is. Moreover, covariates can be included for both model components separately, which yields insight into their unique and shared antecedents. By doing this, the present paper offers a methodological-substantive synergy, showing how sophisticated methodology can be used to examine an important substantive issue.

  5. 26 CFR 1.460-1 - Long-term contracts.

    Science.gov (United States)

    2010-04-01

    ... the manufacture of personal property is a manufacturing contract. In contrast, a contract for the... performance of engineering and design services, and the production of components and subassemblies that are..., enters into a single long-term contract to design and manufacture a satellite and to develop computer...

  6. Generic component reliability data for research reactor PSA

    International Nuclear Information System (INIS)

    1997-02-01

    The purpose of this document is to provide reference generic component-reliability information for a variety of research reactor types. As noted in Section 2 and Table IV, component data accumulated over many years is in the database. It is expected that the report should provide representative data which will remain valid for a number of years. The database provides component failure rates on a time and/or demand related basis according to the operational modes of the components. No update of the database is presently planned. As a result of the implementation of data collection systems in the research reactors represented in these studies, updating of data from individual facilities could be made available by the contributing research reactor facilities themselves. As noted in Section 1.1, the report does not include a detailed discussion of information regarding component classification and reliability parameter definitions. The report does provide some insights and discussions regarding the practicalities of the data collection process and some guidelines for database usage. 9 refs, 7 tabs

  7. Contracting for safety with patients: clinical practice and forensic implications.

    Science.gov (United States)

    Garvey, Keelin A; Penn, Joseph V; Campbell, Angela L; Esposito-Smythers, Christianne; Spirito, Anthony

    2009-01-01

    The contract for safety is a procedure used in the management of suicidal patients and has significant patient care, risk management, and medicolegal implications. We conducted a literature review to assess empirical support for this procedure and reviewed legal cases in which this practice was employed, to examine its effect on outcome. Studies obtained from a PubMed search were reviewed and consisted mainly of opinion-based surveys of clinicians and patients and retrospective reviews. Overall, empirically based evidence to support the use of the contract for safety in any population is very limited, particularly in adolescent populations. A legal review revealed that contracting for safety is never enough to protect against legal liability and may lead to adverse consequences for the clinician and the patient. Contracts should be considered for use only in patients who are deemed capable of giving informed consent and, even in these circumstances, should be used with caution. A contract should never replace a thorough assessment of a patient's suicide risk factors. Further empirical research is needed to determine whether contracting for safety merits consideration as a future component of the suicide risk assessment.

  8. PRICING AND ASSESSING UNIT-LINKED INSURANCE CONTRACTS WITH INVESTMENT GUARANTEES

    Directory of Open Access Journals (Sweden)

    Ciumas Cristina

    2014-07-01

    Full Text Available One of the most interesting life insurance products to have emerged in recent years in the Romanian insurance market has been the unit-linked contract. Unit-linked insurance products are life insurance policies with investment component. A unit-linked life insurance has two important components: protection and investment. The protection component refers to the insured sum in case of the occurrence of insured risks and the investment component refers to the policyholders’ account that represents the present value of the units from the chosen investment funds. Due to the financial instability caused by the Global Crisis and the amplification of market competitiveness, insurers from international markets have started to incorporate guarantees in unit-linked products. So a unit- linked life insurance policy with an asset value guarantee is an insurance policy whose benefit payable on death or at maturity consists of the greater of some guaranteed amount and the value of the units from the investment funds. One of the most challenging issues concerns the pricing of minimum death benefit and maturity benefit guarantees and the establishing of proper reserves for these guarantees. Insurers granting guarantees of this type must estimate the cost and include the cost in the premium. An important component of the activity carried out by the insurance companies is the investment of the premiums paid by policyholders in various types of assets, in order to obtain higher yields than those guaranteed by the insurance contracts, while providing the necessary liquidity for the payment of insurance claims in case of occurrence of the assumed risks. So the guaranteed benefits can be broadly matched or immunized with various types of financial assets, especially with fixed-interest instruments. According to Romanian legislation which regulates the unit-linked life insurance market, unit-linked life insurance contracts pass most of the investment risk to the

  9. Radiation research contracts: Biological effects of small radiation doses

    International Nuclear Information System (INIS)

    Hug, O.

    1959-01-01

    According to its Statute the IAEA has to fulfil a dual function - to help individual countries in solving their specific problems and to undertake tasks in the common interest of all its Member States. With this latter aim in mind the Agency has placed a number of research contracts with national research institutes. The purpose and scope of two of them is described below by the scientists responsible for their execution. The Agency has contributed to this work by putting at the institutes' disposal scientists from its own staff apparatus and financial aid.IAEA placed a research contract concerning the effects of small radiation doses on cells, in particular on nervous cells, with the Pharmacological Institute of the University of Vienna. This Institute appeared well suited to deal with the problem owing to the type of its previous research work. The Director, Prof. Franz Bruecke, and his collaborator Dr. Otto Kraupp, have long been interested in the functioning of the nervous system and in the influence of different drugs upon it. It was particularly fortunate that the electrical properties and functions of cells had been measured by a method specially developed at this Institute. From the above mentioned observations one could expect that instantaneous reactions of cells to radiation would also lead to changes of the electrical status. Consequently, this method is now being applied to the research undertaken for IAEA. Different cells of plants and animals, ranging from algae to muscle fibres of mammals, were chosen as objects. So far changes of potentials-had been observed only during irradiation with very high doses. During these investigations another useful test for small radiation doses was developed, namely the measurement of the through-flow of an artificial blood solution through the blood vessels of an intestinal loop. It was observed that a few seconds after irradiation the flow rate diminishes, and returns to its normal level only when irradiation ends

  10. Radiation research contracts: Biological effects of small radiation doses

    Energy Technology Data Exchange (ETDEWEB)

    Hug, O

    1959-01-15

    According to its Statute the IAEA has to fulfil a dual function - to help individual countries in solving their specific problems and to undertake tasks in the common interest of all its Member States. With this latter aim in mind the Agency has placed a number of research contracts with national research institutes. The purpose and scope of two of them is described below by the scientists responsible for their execution. The Agency has contributed to this work by putting at the institutes' disposal scientists from its own staff apparatus and financial aid.IAEA placed a research contract concerning the effects of small radiation doses on cells, in particular on nervous cells, with the Pharmacological Institute of the University of Vienna. This Institute appeared well suited to deal with the problem owing to the type of its previous research work. The Director, Prof. Franz Bruecke, and his collaborator Dr. Otto Kraupp, have long been interested in the functioning of the nervous system and in the influence of different drugs upon it. It was particularly fortunate that the electrical properties and functions of cells had been measured by a method specially developed at this Institute. From the above mentioned observations one could expect that instantaneous reactions of cells to radiation would also lead to changes of the electrical status. Consequently, this method is now being applied to the research undertaken for IAEA. Different cells of plants and animals, ranging from algae to muscle fibres of mammals, were chosen as objects. So far changes of potentials-had been observed only during irradiation with very high doses. During these investigations another useful test for small radiation doses was developed, namely the measurement of the through-flow of an artificial blood solution through the blood vessels of an intestinal loop. It was observed that a few seconds after irradiation the flow rate diminishes, and returns to its normal level only when irradiation ends

  11. Exchange relationships: examining psychological contracts and perceived organizational support.

    Science.gov (United States)

    Coyle-Shapiro, Jacqueline A-M; Conway, Neil

    2005-07-01

    The authors surveyed 347 public sector employees on 4 measurement occasions to investigate the conceptual distinctiveness of the psychological contract and perceived organizational support (POS) and how they are associated over time. Results support the distinctiveness of the 2 concepts. In terms of their interrelationships over time, by drawing on psychological contract theory the authors found little support for a reciprocal relationship between POS and psychological contract fulfillment. Under an alternative set of hypotheses, by drawing on organizational support theory and by separating psychological contract fulfillment into its 2 components (perceived employer obligations and inducements), the authors found that perceived employer inducements were positively related to POS, which, in turn, was negatively related to perceived employer obligations. The results suggest that POS and the components of psychological contract fulfillment are more important in predicting organizational citizenship behavior than psychological contract fulfillment. Copyright 2005 APA, all rights reserved.

  12. The development and validation of a psychological contract of safety scale.

    Science.gov (United States)

    Walker, Arlene

    2010-08-01

    This paper builds on previous research by the author and describes the development and validation of a new measure of the psychological contract of safety. The psychological contract of safety is defined as the beliefs of individuals about reciprocal safety obligations inferred from implicit and explicit promises. A psychological contract is established when an individual believes that perceived employer and employee safety obligations are contingent on each other. A pilot test of the measure is first undertaken with participants from three different occupations: nurses, construction workers, and meat processing workers (N=99). Item analysis is used to refine the measure and provide initial validation of the scale. A larger validation study is then conducted with a participant sample of health care workers (N=424) to further refine the measure and to determine the psychometric properties of the scale. Item and correlational analyses produced the final employer and employee obligations scales, consisting of 21 and 17 items, respectively. Factor analyses identified two underlying dimensions in each scale comparable to that previously established in the organizational literature. These transactional and relational-type obligations provided construct validity of the scale. Internal consistency ratings using Cronbach's alpha found the components of the psychological contract of safety measure to be reliable. The refined and validated psychological contract of safety measure will allow investigation of the positive and negative outcomes associated with fulfilment and breach of the psychological contract of safety in future research. 2010 Elsevier Ltd. All rights reserved.

  13. Selecting the right collaborative components in a construction project

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev; Wandahl, Søren

    2018-01-01

    Regardless of context and scope, collaboration is consistently attributed to be an essential determinant of success in construction projects. Researches have long been concerned with the issue of poor collaboration, but situational determination of collaborative components has been overlooked....... The questionnaire was distributed electronically to 440 respondents; after sorting a total of 288 valid responses were obtained. The result is a set of components in a model of structures of collaboration that facilitates a more efficient and effective situational collaboration (EESC), it is denoted as target areas...... structured in type of contract, party and component....

  14. Dream Interpretation as a Component of Researcher's Reflexivity within an Ethnographic Research

    Science.gov (United States)

    Miškolci, Jozef

    2015-01-01

    Researchers' "reflexivity" about how they shape the phenomena that they study within the data collection process is often presented as a crucial component of ethnographic research methodology. Nevertheless, academic literature about ethnography is mostly silent around whether researchers' dreams are relevant to the research process and…

  15. Roles of contract research organizations in translational medicine

    Directory of Open Access Journals (Sweden)

    Mei-Shu Shih

    2015-04-01

    Full Text Available Transitional medicine/science is shifting the medical research paradigm from compound-based to evidence-based drug/device discovery. It is increasing interdisciplinary collaborations, enhancing usage of advanced technologies, and facilitating therapeutics reaching patients faster. The fundamental theme of evidence-based discovery is to apply what is revealed in preclinical experimentation and to bring the resulting safety and efficacy to clinics. In the medical fields, a contract research organization (CRO works like a hired agent who has corresponding knowledge and experience to conduct and complete tasks for a sponsor. The relationship is business, and the contract is for deliverables. The increasingly high volume of sponsored outsourcing work has made this for-profit business boom in the past decade. Location boundaries are being blurred under globalization in the sciences and cross-border regulatory reviews. Getting from bench to bedside is a winding road with many obstacles and high hurdles. Efficient teamwork becomes essential to materialize ideas and bring them to the market. The professionals within team communities include drug/device makers and CROs. It has become increasingly obvious that CROs play pivotal roles in the chain of discovery/design, developing product to market through in vitro, in vivo, and ex vivo testing during preclinical experimentations and clinical trials. Project management teams are responsible for nurturing the materialization in a collaborative manner and enhancing the productivity of the pipelines. CROs have many functional aspects and specialties, and no one organization is fully capable of serving, i.e., integrated services, with expertise in each step of the chain to the needs of a variety of sponsors. Instead of competition among the CROs themselves, the continuously expanding market demands can be shared by Expertise-Based Integrated Services among allied CROs, in contrast to the few large CROs

  16. Static Verification for Code Contracts

    Science.gov (United States)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  17. 48 CFR 16.103 - Negotiating contract type.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Selecting Contract Types 16.103 Negotiating contract... basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be...) Contracts on a firm fixed-price basis other than those for major systems or research and development, and (3...

  18. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  19. Valuing Professional Development Components for Emerging Undergraduate Researchers

    Science.gov (United States)

    Cheung, I.

    2015-12-01

    In 2004 the Hatfield Marine Science Center (HMSC) at Oregon State University (OSU) established a Research Experience for Undergraduates (REU) program to engage undergraduate students in hands-on research training in the marine sciences. The program offers students the opportunity to conduct research focused on biological and ecological topics, chemical and physical oceanography, marine geology, and atmospheric science. In partnership with state and federal government agencies, this ten-week summer program has grown to include 20+ students annually. Participants obtain a background in the academic discipline, professional development training, and research experience to make informed decisions about careers and advanced degrees in marine and earth system sciences. Professional development components of the program are designed to support students in their research experience, explore career goals and develop skills necessary to becoming a successful young marine scientist. These components generally include seminars, discussions, workshops, lab tours, and standards of conduct. These componentscontribute to achieving the following professional development objectives for the overall success of new emerging undergraduate researchers: Forming a fellowship of undergraduate students pursuing marine research Stimulating student interest and understanding of marine research science Learning about research opportunities at Oregon State University "Cross-Training" - broadening the hands-on research experience Exploring and learning about marine science careers and pathways Developing science communication and presentation skills Cultivating a sense of belonging in the sciences Exposure to federal and state agencies in marine and estuarine science Academic and career planning Retention of talented students in the marine science Standards of conduct in science Details of this program's components, objectives and best practices will be discussed.

  20. 76 FR 54242 - Agency Information Collection Activities: Post-Award Contract Information

    Science.gov (United States)

    2011-08-31

    ... Governmentwide implementation of e-Government initiatives, it is commonplace within many of DHS's Components for... documentation, Government estimate of contract price, contract modifications, Small Business Administration... information requested is used by the Government's contracting officers and other acquisition personnel...

  1. Lifetime evaluation of Bohunice NPP components

    International Nuclear Information System (INIS)

    Kupca, L.

    2001-01-01

    The paper discuss some aspects of the main primary components lifetime evaluation program in Bohunice NPP which is performed by Nuclear Power Plant Research Institute (NPPRI) Trnava in cooperation with Bohunice and other organizations involved. Facts presented here are based on the NPPRI research report which is regularly issued after each reactor fuel campaign under conditions of project resulted from the contract between NPPRI and Bohunice NPP. For the calculations, there has been used some computer codes adapted (or made) by NPPRI and the results are just the conclusive and very brief, presented here in Tables (Figures). (authors)

  2. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  3. Iterative Contracts as Proactive Law Instruments

    DEFF Research Database (Denmark)

    Henschel, René Franz

    2012-01-01

    The purpose of this article is to analyse the use of proactive law in contracts illustrated by the use of a particular type of contract within the IT industry, the so-called iterative contract. This type of contract has its root in a special software development process called iterative and incre...... the potential to create more business success. However, empirical research still needs to be done in order to confirm that these types of contracts are better at securing business success than traditional contract forms....

  4. Proposal to Negotiate an Amendment to an Existing Contract and Several Contracts for the Supply and Assembly of the LHC Short Straight Section Cryostats

    CERN Document Server

    2002-01-01

    Following the insolvency of a major contractor, CERN proposes to negotiate an amendment to an existing contract and to place several contracts for the supply of 360 LHC arc short straight section cryostats and their assembly, eight spare cryostat units and components for 64 LHC dispersion suppressor short straight section cryostats. The Finance Committee is therefore invited to approve an amendment to an existing contract with the consortium: &8721; INTERTEC (DK) - CEGELEC (FR) - SPIE TRINDEL (FR) to include assembly of the LHC arc short straight sections, for an additional amount of 4 088 470 euros (6 205 480 Swiss francs), subject to revision for inflation after 31 December 2002; the consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal : DK - 52%, FR - 48%; and to the negotiation of contracts for the supply of related major components with the firms: &8721; SES (SK) for the supply of vacuum vessels for an amount of 5 538 533 euros...

  5. 48 CFR 46.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... QUALITY ASSURANCE Warranties 46.710 Contract clauses. The clauses and alternates prescribed in this... research and development contract is contemplated and the use of a warranty clause has been approved under... performance specifications or design are of major importance; a fixed-price supply, service, or research and...

  6. Incomplete contracting theory in empirical accounting research

    NARCIS (Netherlands)

    van Lent, L.A.G.M.

    1999-01-01

    In three essays, the implications of the costly contracting approach in accounting are investigated. First, the consequences of changing the set of acceptable accounting techniques in the banking and insurance industry are examined. The regulations imposed by a government agency alter the

  7. Non-Performance Pay and Relational Contracting: Evidence from CEO Compensation

    DEFF Research Database (Denmark)

    DeVaro, Jed; Kim, Jin-Hyuk; Vikander, Nick

    2017-01-01

    compensation by invoking the idea of informal agreements, specifically the theory of relational contracting. We derive observable implications to distinguish relational from formal contracting and, using ExecuComp data, find that CEOs' annual cash and equity incentive payments positively correlate...... with the cyclical component of sales and respond to measures of persistence as relational contracting theory predicts....

  8. Neutron-Induced Fission Cross Section of Uranium, Americium and Curium Isotopes. Progress report - Research Contract 14485, Coordinated Research Project on Minor Actinide Neutron Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Alekseev, A.A.; Bergman, A.A.; Berlev, A.I.; Koptelov, E.A.; Samylin, B.F.; Trufanov, A.M.; Fursov, B.I.; Shorin, V.S.

    2009-12-01

    This report contains brief description of the Lead Slowing Down Spectrometer and results of measurements of neutron-induced fission cross sections for 236 U, 242m Am, 243 Cm, 244 Cm, 245 Cm and 246 Cm done at this spectrometer. The work was partially supported through the IAEA research contract RC-14485-RD in the framework of the IAEA Coordinated Research Project 'Minor Actinide Neutron Reaction Data (MANREAD)'. The detailed description of the experimental set up, measurements procedure and data treatment can be found in the JIA-1182 (2007) and JIA-1212 (2009) reports from the Institute of Nuclear Research of the Russian Academy of Science published in Russian. Part 1 contains the first year report of the research contract and part 2 the second year report. (author)

  9. Federal Research and Development Contract Trends and the Supporting Industrial Base, 2000-2014

    Science.gov (United States)

    2016-04-30

    Homeland Security, and government-wide services contracting trends; sourcing policy and cost estimation methodologies; and recent U.S. Army modernization ...been fears that the sharp downturn in federal contract obligations would disproportionately impact the R&D contracting portfolios within individual...329 - contracting portfolios , and the industrial base that supports those efforts, within each R&D contracting agency. The main finding of this

  10. Bioactivity-guided isolation of spasmolytic components of Pycnocycla spinosa Decne ex Boiss.

    Science.gov (United States)

    Sadraei, H; Asghari, G; Behzad, S

    2011-07-01

    Hydroalcoholic extract of Pycnocycla spinosa has spasmolytic effect in vitro and antidiarrhoeal action in vivo. The aim of this research was to separate fractions of total hydroalcoholic extract of P. spinosa guided by their spasmolytic activity. Aerial parts of P. spinosa were extracted with ethanol. The concentrated extract was subjected to column chromatography and thin layer chromatography. Initially four fractions were obtained (F1, F2, F3, and F4) and their spasmolytic activities were determined on ileum contraction induced by KCl (80 mM). The more active fraction was subjected to further isolation and tested to find its most active components. The active component was phytochemically characterized using phytochemical methods including ultraviolet and infrared spectroscopy. Hydroalcoholic extract of P. spinosa (10-320 μg/ml) in a concentration dependent manner inhibited ileum contraction with the IC(50) value of 47 ± 8.1 μg/ml (mean ± S.E.M., n=6). Fraction F2 was the most potent inhibitor of ileum contraction (IC(50)= 3.4 ± 0.33 μg/ml). From five sub-fractions separated from fraction F2 (F2a, F2b, F2c, F2d, and F2e, respectively), F2c was a more active component with the IC(50) value of 2.6 ± 0.27 μg/ml. The primary results of target fraction (F2c) showed sugar moiety in its structure or in one of its components. In this research we have isolated pharmacological active fraction which is most likely responsible for antispasmodic action of P. spinosa hydroalcoholic extract.

  11. Defense Threat Reduction Agency > Contracts > Contract Award Data

    Science.gov (United States)

    Integration Command Senior Enlisted Leader Media News News Archive Strategic Plan Videos Mission Research Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current Justifications & Approvals Careers Who We Are Our Values Strategic Recruiting Programs Professional

  12. New Perils for the Contract Ethnographer.

    Science.gov (United States)

    Fetterman, David M.

    1981-01-01

    Conditions of contract research may lead some workers to ignore publication rights of colleagues whose reports are of limited circulation. The author presents a case example of how this process occurred with the use of his own work and argues for rigorous ethical standards in the publication of contract research results. (Author/GC)

  13. Informal contracting between and within firms

    Directory of Open Access Journals (Sweden)

    Ricard Gil

    Full Text Available Abstract While informal contracts are widely used in modern economies, limited systematic empirical evidence is available to researchers and policy makers. This paper aims to fill the gap by discussing a selected sample of empirical works through the lens of a theoretical framework that clarifies the role of informal contracts. We also highlight unexplored research opportunities offered by more recent theoretical models that investigate how informal contracts are built over time, how they are subject to path dependency, and how relational rents are created, and are awaiting empirical analysis.

  14. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  15. Operating The Central Process Systems At Glenn Research Center

    Science.gov (United States)

    Weiler, Carly P.

    2004-01-01

    As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the

  16. 12 CFR Appendix A to Subpart A of... - Minimum Capital Components for Interest Rate and Foreign Exchange Rate Contracts

    Science.gov (United States)

    2010-01-01

    ... sheet interest rate and foreign exchange rate contracts: a. Interest Rate Contracts i. Single currency... Contracts i. Cross-currency interest rate swaps. ii. Forward foreign exchange rate contracts. iii. Currency... contracts traded on exchanges that require daily payment of variation margins are excluded from the minimum...

  17. Materials and Components Technology Division research summary, 1992

    International Nuclear Information System (INIS)

    1992-11-01

    The Materials and Components Technology Division (MCT) provides a research and development capability for the design, fabrication, and testing of high-reliability materials, components, and instrumentation. Current divisional programs related to nuclear energy support the development of the Integral Fast Reactor (IFR): life extension and accident analyses for light water reactors (LWRs); fuels development for research and test reactors; fusion reactor first-wall and blanket technology; and safe shipment of hazardous materials. MCT Conservation and Renewables programs include major efforts in high-temperature superconductivity, tribology, nondestructive evaluation (NDE), and thermal sciences. Fossil Energy Programs in MCT include materials development, NDE technology, and Instrumentation design. The division also has a complementary instrumentation effort in support of Arms Control Technology. Individual abstracts have been prepared for the database

  18. DIACHRONIC ANALYSIS OF THREE PALESTINIAN MARRIAGE CONTRACTS: IMPLICATIONS FOR TRANSLATORS

    Directory of Open Access Journals (Sweden)

    Mohammad Ahmad Thawabteh

    2014-12-01

    Full Text Available Unlike other discourses, legal discourse should be very simple, straightforward and unambiguous, and so should legal translation. However, legal translation implies multifarious challenges. Though, it is still under-research in the Arab World and the Occupied Palestinian Territories (OPT. The present article attempts to shed some light on the development of the language of legal texts in the OPT as illustrated in the study of three marriage contracts representing three sporadic periods of time— post-First World War, post-Israeli occupation to Palestine and post-foundation of Palestinian National Authority (PNA. The rationale beyond this selection is that the OPT has witnessed a political upheaval since the First World War, started with British Mandate until 1948, Israeli occupation in 1948 and now the rule of PNA. A thorough investigation into the contracts over these periods of time shows a noticeable development of the language of the contracts in terms of terminologies, structure and cultural components. The article reveals a good affinity between the language employed in the structure of the contracts and the social, economic and political situations when the contracts were written. Translation-wise, the article reflects on sample translations of the contracts by Hatim et al. (1995 with a view to examining the intricacies of legal translation. The findings show how important for legal translator to be well-versed in the language of law and the development of legal discourse diachronically. The article finally draws some conclusions which may be useful for legal translator trainers/trainees.

  19. AICAR stimulation metabolome widely mimics electrical contraction in isolated rat epitrochlearis muscle.

    Science.gov (United States)

    Miyamoto, Licht; Egawa, Tatsuro; Oshima, Rieko; Kurogi, Eriko; Tomida, Yosuke; Tsuchiya, Koichiro; Hayashi, Tatsuya

    2013-12-15

    Physical exercise has potent therapeutic and preventive effects against metabolic disorders. A number of studies have suggested that 5'-AMP-activated protein kinase (AMPK) plays a pivotal role in regulating carbohydrate and lipid metabolism in contracting skeletal muscles, while several genetically manipulated animal models revealed the significance of AMPK-independent pathways. To elucidate significance of AMPK and AMPK-independent signals in contracting skeletal muscles, we conducted a metabolomic analysis that compared the metabolic effects of 5-aminoimidazole-4-carboxamide-1-β-D-ribonucleoside (AICAR) stimulation with the electrical contraction ex vivo in isolated rat epitrochlearis muscles, in which both α1- and α2-isoforms of AMPK and glucose uptake were equally activated. The metabolomic analysis using capillary electrophoresis time-of-flight mass spectrometry detected 184 peaks and successfully annotated 132 small molecules. AICAR stimulation exhibited high similarity to the electrical contraction in overall metabolites. Principal component analysis (PCA) demonstrated that the major principal component characterized common effects whereas the minor principal component distinguished the difference. PCA and a factor analysis suggested a substantial change in redox status as a result of AMPK activation. We also found a decrease in reduced glutathione levels in both AICAR-stimulated and contracting muscles. The muscle contraction-evoked influences related to the metabolism of amino acids, in particular, aspartate, alanine, or lysine, are supposed to be independent of AMPK activation. Our results substantiate the significance of AMPK activation in contracting skeletal muscles and provide novel evidence that AICAR stimulation closely mimics the metabolomic changes in the contracting skeletal muscles.

  20. Research on the energy-saving and revenue sharing strategy of ESCOs under the uncertainty of the value of Energy Performance Contracting Projects

    International Nuclear Information System (INIS)

    Qian, Dong; Guo, Ju’e

    2014-01-01

    Under the uncertainty of the value of Energy Performance Contracting Projects (EPCPs), this paper develops a revenue-sharing bargaining model between an Energy Service Company (ESCO) and an Energy-Using Organization (EU). Based on the model the paper analyzes the impacts of energy prices, risk-adjusted discount rates and accidents on the ESCO’s bargaining strategies. The research shows that the greater the probability of adverse circumstances is, the higher is the revenue share (of the EU), and the more disadvantageous is the ESCO’s position in the game. Furthermore, we design a forecast–commitment contract between an ESCO and an EU and analyze the optimal product’s energy savings commitment strategy of the ESCO to cope with uncertain energy savings and contract risk. The research illustrates that by introducing penalties and commitments, the contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent; when the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment, thus enhancing the strategy value of the bilateral relationship and reducing the contract risk. Finally, the policy recommendations about improving shared savings contract standard, third-party energy savings measurement and verification mechanism and arbitration mechanism of EPCs are provided. - Highlights: • We provide a method for determining the revenue-sharing bargaining strategy space in a finite bargaining game of the ESCO. • The increase of the probability of adverse circumstances will increase the revenue share (of the EU). • We design a forecast–commitment contract between an ESCO and an EU. • The forecast–commitment contract can eliminate the impact of the uncertain energy savings on the contract execution to a certain extent. • When the EU takes a greater commitment risk, the ESCO is willing to provide a higher commitment

  1. A Module Language for Typing by Contracts

    Science.gov (United States)

    Glouche, Yann; Talpin, Jean-Pierre; LeGuernic, Paul; Gautier, Thierry

    2009-01-01

    Assume-guarantee reasoning is a popular and expressive paradigm for modular and compositional specification of programs. It is becoming a fundamental concept in some computer-aided design tools for embedded system design. In this paper, we elaborate foundations for contract-based embedded system design by proposing a general-purpose module language based on a Boolean algebra allowing to define contracts. In this framework, contracts are used to negotiate the correctness of assumptions made on the definition of a component at the point where it is used and provides guarantees to its environment. We illustrate this presentation with the specification of a simplified 4-stroke engine model.

  2. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  3. Campaign contributions, lobbying and post-Katrina contracts.

    Science.gov (United States)

    Hogan, Michael J; Long, Michael A; Stretesky, Paul B

    2010-07-01

    This research explores the relationship between political campaign contributions, lobbying and post-Hurricane Katrina cleanup and reconstruction contracts. Specifically, a case-control study design is used to determine whether campaign contributions to national candidates in the 2000-04 election cycles and/or the employment of lobbyists and lobbying firms increased a company's probability of receiving a post-hurricane contract. Results indicate that both a campaign contribution dichotomous variable and the dollar amount of contributions are significantly related to whether a company received a contract, but that lobbying activity was not. These findings are discussed in the context of previous research on the politics of natural disasters, government contracting and governmental and corporate deviance.

  4. Invalidity of contract: legislative regulation and types

    Directory of Open Access Journals (Sweden)

    Василь Іванович Крат

    2017-09-01

    Full Text Available Invalidity contracts always attracted attention researchers. Without regard to it, in modern conditions there is an enormous layer of the problems related to invalidity contract, that to require a doctrine and utilitarian comprehension. The article is sanctified to research invalidity contract. In the article analyses problems of the legislative regulation and types of invalidity contract through the prism of judicial practice. In the Civil code of Ukraine, a voidable contract sets as a common rule. A voidable of the contract is incarnated in the so-called «virtual» invalidity when only the most typical grounds are enumerated. However, even such approach does not allow to overcome all possible cases that arise up in practice. Such situation touches possibility of voidable contracts concluded with the purpose of to shut out the appeal of claim to the property of the debtor. Therefore it follows to set general rules in relation to voidable contracts of the debtor. A nullity of the contract takes place only in the case when there is the direct pointing of law on the qualification of that or another contract as the nullity. The nullity of contract in the Civil code of Ukraine is constructed by means of «textual» invalidity. There are no single attempts to use the construction of «virtual» invalidity in judicial practice when there is the direct pointing of law on the qualification of that or another contract as the nullity, that is impermissible. Methodologically incorrectly to carry out identifying of invalidity contract and obligation with the aim of providing of application of different after the rich in content filling norms.

  5. Basic Neuroscience Research with Nonhuman Primates: A Small but Indispensable Component of Biomedical Research

    NARCIS (Netherlands)

    Roelfsema, P.R.; Treue, S.

    2014-01-01

    Research with nonhuman primates represents a small component of neuroscience with far-reaching relevance that is irreplaceable for essential insights into cognitive functions, brain disease, and therapy. Transparency and widespread information about this research and its importance is central to

  6. Basic neuroscience research with nonhuman primates: a small but indispensable component of biomedical research

    NARCIS (Netherlands)

    Roelfsema, Pieter R.; Treue, Stefan

    2014-01-01

    Research with nonhuman primates represents a small component of neuroscience with far-reaching relevance that is irreplaceable for essential insights into cognitive functions, brain disease, and therapy. Transparency and widespread information about this research and its importance is central to

  7. Basic neuroscience research with nonhuman primates : a small but indispensable component of biomedical research

    NARCIS (Netherlands)

    Roelfsema, Pieter R; Treue, Stefan

    2014-01-01

    Research with nonhuman primates represents a small component of neuroscience with far-reaching relevance that is irreplaceable for essential insights into cognitive functions, brain disease, and therapy. Transparency and widespread information about this research and its importance is central to

  8. Recycling Flight Hardware Components and Systems to Reduce Next Generation Research Costs

    Science.gov (United States)

    Turner, Wlat

    2011-01-01

    With the recent 'new direction' put forth by President Obama identifying NASA's new focus in research rather than continuing on a path to return to the Moon and Mars, the focus of work at Kennedy Space Center (KSC) may be changing dramatically. Research opportunities within the micro-gravity community potentially stands at the threshold of resurgence when the new direction of the agency takes hold for the next generation of experimenters. This presentation defines a strategy for recycling flight experiment components or part numbers, in order to reduce research project costs, not just in component selection and fabrication, but in expediting qualification of hardware for flight. A key component of the strategy is effective communication of relevant flight hardware information and available flight hardware components to researchers, with the goal of 'short circuiting' the design process for flight experiments

  9. Research ethics in the era of personalized medicine: updating science's contract with society.

    Science.gov (United States)

    Meslin, Eric M; Cho, Mildred K

    2010-01-01

    With the completed sequence of the human genome has come the prospect of substantially improving the quality of life for millions through personalized medicine approaches. Still, any advances in this direction require research involving human subjects. For decades science and ethics have enjoyed an allegiance reflected in a common set of ethical principles and procedures guiding the conduct of research with human subjects. Some of these principles emphasize avoiding harm over maximizing benefit. In this paper we revisit the priority given to these ethical principles - particularly the principles that support a cautious approach to science - and propose a reframing of the 'social contract' between science and society that emphasizes reciprocity and meeting public needs.

  10. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  11. CONTRACT FOLLOW UP TRAINING

    CERN Multimedia

    Technical Training; Tel. 74460

    2001-01-01

    SPL is organizing Training Sessions on the Contract Follow Up application. CFU is a Web based tool, developped and supported by the Administrative Information Services. It allows the creation of Divisional Requests and the follow up of their processing, from the Market Survey to the Invitation to Tender or Price Enquiry, approval by the Finance Committee, up to the actual signature of a Contract, acccording to the CERN Purchasing procedures. It includes a document management component. It also provides link with other AIS applications such as BHT and EDH. The course is primarily intended for DPOs, Contract Technical responsibles in the division and their assistants, but is beneficial to anybody involved in the follow up of such Purchasing Procedures. This course is free of charge, but application is necessary. The details of the course may be found at http://training.web.cern.ch/Training/ENSTEC/P2001/Bureautique/cfu4_f.htm General information of CFU may be found at http://ais.cern.ch/apps/cfu/ The dates of t...

  12. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  13. Flight service evaluation of composite helicopter components

    Science.gov (United States)

    Mardoian, George H.; Ezzo, Maureen B.

    1994-01-01

    This paper presents the results of a NASA funded contract and Sikorsky research and development programs to evaluate structural composite components in flight service on Sikorsky Model S-76 helicopters. Selected components were removed and tested at prescribed intervals over a nine year time frame. Four horizontal stabilizers and thirteen tail rotor spars were returned from commercial service in West Palm Beach, Florida and in the Gulf Coast region of Louisiana to determine the long term effects of operations in hot and humid climates on component performance. Concurrent with the flight component evaluation, panels of materials used in their fabrication were exposed to the environment in ground racks. Selected panels were tested annually to determine the effects of exposure on physical and mechanical properties. The results of 55,741 component flight hours and 911 months of field exposure are reported and compared with initial Federal Aviation Administration (FAA) certification data. The findings of this program have provided increased confidence in the long term durability of advanced composite materials used in helicopter structural applications.

  14. The Contracting Parties' Ability To Conclude The Employment Contract

    Directory of Open Access Journals (Sweden)

    Carmen Constantina NENU

    2014-08-01

    Full Text Available This study's main objective is to analyze certain effects produced by the changes of the Labor Code and by the entry into force of the current Romanian Civil Code. These effects refer to one of the fundamental conditions for the valid conclusion of the individual employment contract, that is, to the legal capacity of employers and employees. Thus, a complete analysis of legal regulations and of the correlations between different provisions on the legal capacity of parties to the individual employment contract is required to identify the existing noncompliance and to propose solutions. The research demonstrated that the current regulatory framework governing the legal capacity of the parties to an individual employment contract does not entirely correspond to the social reality. Therefore, only the employer benefits from a relatively comprehensive statutory regulation on the legal capacity to conclude an individual employment contract. The employee, however, does not benefit from the same attention from legislature. Considering the above, the study represents a significant scientific contribution, whose value lies in the proposed changes to modify legislature, so that the legal capacity of job holders would benefit from fair regulation, in accordance with the principle of legal protection of employee rights.

  15. Clemson Apparel Research. Years 4 and 5 Demonstration Contract

    National Research Council Canada - National Science Library

    Kernodle, Joseph

    2001-01-01

    The purpose of this contract is to develop and demonstrate modern technologies and management practices that optimize the performance of the Department of Defense's Clothing and Textile's supply chain...

  16. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  17. Blockchain-based Smart Contracts: A Systematic Mapping Study

    OpenAIRE

    Alharby, Maher; van Moorsel, Aad

    2017-01-01

    An appealing feature of blockchain technology is smart contracts. A smart contract is executable code that runs on top of the blockchain to facilitate, execute and enforce an agreement between untrusted parties without the involvement of a trusted third party. In this paper, we conduct a systematic mapping study to collect all research that is relevant to smart contracts from a technical perspective. The aim of doing so is to identify current research topics and open challenges for future stu...

  18. Potassium-induced contraction in the lamb proximal urethra: Involvement of norepinephrine and different calcium entry pathways

    International Nuclear Information System (INIS)

    Garcia-Pascual, A.; Costa, G.; Isla, M.; Jimenez, E.; Garcia-Sacristan, A.

    1991-01-01

    The purpose of this work was to investigate the mechanisms involved in the peculiar biphasic response of the lamb urethral smooth muscle to high K+ solutions. The relative amplitude of the phasic and tonic components of the contraction and its reproducibility were dependent on the concentration of K+ used. Only concentrations higher than 80 mM (i.e., 120 mM) showed a tonic component greater in amplitude than the phasic one and manifested a tachyphylactic effect. Phentolamine (10(-6) M), prazosin (10(-6) M) and chemical denervation with 6-hydroxydopamine significantly inhibited the tonic component of the K+ (120 mM)-induced contraction, modifying its morphology. Reproducible contractions to K+ (120 mM) could be obtained in the presence of prazosin (10(-6) M) or cocaine (10(-6) M). The preparations were also shown to accumulate [3H]noradrenaline and release it upon depolarization with K+ (60 and 120 mM). Calcium removal inhibited the K+ (120 mM)-induced contraction. After addition of calcium (0.5-5 mM) the contractile activity was restored. Nifedipine (10(-6) M) and verapamil (10(-6) M) but not sodium nitroprusside (10(-6) M) significantly blocked the contractile response for calcium as well as the phasic component of the K+ contraction in calcium-containing medium. In preparations treated with prazosin (10(-6) M) the tonic component of the K+ (120 mM) contraction was more sensitive to nifedipine and removal of extracellular calcium than the phasic one

  19. Clemson Apparel Research Demonstration Contract. Years 6 and 7

    National Research Council Canada - National Science Library

    Kernodle, Joseph

    2003-01-01

    The purpose of this contract is to develop and demonstrate modern technologies and management practices that optimize the performance of the Department of Defense's Clothing and Textiles (C&T) supply chain...

  20. Foundations of Session Types and Behavioural Contracts

    DEFF Research Database (Denmark)

    Huttel, Hans; Lanese, Ivan; T. Vasconcelos, Vasco

    2016-01-01

    Behavioural type systems, usually associated to concurrent or distributed computations, encompass concepts such as interfaces, communication protocols, and contracts, in addition to the traditional input/output operations. The behavioural type of a software component specifies its expected patter...

  1. Compilation of contract research for the Materials Engineering Branch, Division of Engineering Technology. Annual report for FY 1982

    International Nuclear Information System (INIS)

    1983-03-01

    This report presents summaries of the research work performed during Fiscal Year 1982 by laboratories and organizations under contracts administered by the NRC's Materials Engineering Branch, Office of Nuclear Regulatory Research. The contractor reports are organized into the major areas of concern to Primary System Integrity: Vessel and Piping Fracture Mechanics; Pressure Vessel Surveillance Dosimetry; Steam Generators and Environmental Cracking; and Nondestructive Examination

  2. Researching the potentials and limitations of contract farming in sub-Saharan Africa

    DEFF Research Database (Denmark)

    Kuzilwa, Joseph A.; Fold, Niels; Henningsen, Arne

    2017-01-01

    Contract farming has received renewed attention recently as developing economies try to grapple with how to transform the agricultural sector and its associated value chains. This book examines different contract arrangements for selected crops, applying both qualitative and quantitative approach...

  3. A review of typical thermal fatigue failure models for solder joints of electronic components

    Science.gov (United States)

    Li, Xiaoyan; Sun, Ruifeng; Wang, Yongdong

    2017-09-01

    For electronic components, cyclic plastic strain makes it easier to accumulate fatigue damage than elastic strain. When the solder joints undertake thermal expansion or cold contraction, different thermal strain of the electronic component and its corresponding substrate is caused by the different coefficient of thermal expansion of the electronic component and its corresponding substrate, leading to the phenomenon of stress concentration. So repeatedly, cracks began to sprout and gradually extend [1]. In this paper, the typical thermal fatigue failure models of solder joints of electronic components are classified and the methods of obtaining the parameters in the model are summarized based on domestic and foreign literature research.

  4. Identifying key performance indicators in food technology contract R&D

    NARCIS (Netherlands)

    Flipse, S.M.; Sanden, van der M.C.A.; Velden, van der T.; Fortuin, F.T.J.M.; Omta, S.W.F.; Osseweijer, P.

    2013-01-01

    Innovating companies increasingly rely on outsourcing to Contract Research Organisations (CROs) for their Research and Development (R&D), which are largely understudied. This paper presents the outcome of a case study in the field of food technology contract research, identifying context

  5. Values underlying perceptions of breach of the psychological contract

    Directory of Open Access Journals (Sweden)

    Leon Botha

    2010-10-01

    Research purpose: The study identifies the most important breaches and investigates which values underlie employee perceptions of breach of the psychological contract. It also addresses values that lead to employees interpreting incidents as breaches. Motivation for the study: The study calls on the fact that employees make inconsequential contributions to the terms of many formal employment contracts may imply that such contracts cannot be viewed as documents between equals. Research design, approach and method: The study identifies the most prominent breaches of the psychological contract and the values underlying the perceptions that violations have occurred. Main findings: The data revealed lack of promotion, poor interpersonal relations between colleagues and bad treatment by seniors as three main breaches of the contract, and social recognition, world of peace and sense of accomplishment as three dominant values that underlie perceptions of contract violation. Practical/managerial implications: The competent and intelligent manner in which lack of promotion is handled and communicated to employees is vital because it has implications for their willingness to contribute, their career prospects and their intention to stay in the organisation. Contribution/value-add: This research can serve as the basis for the development of survey or research instruments that are appropriate and relevant to the population.

  6. Compilation of contract research for the Materials Branch, Division of Engineering Safety: Annual report for FY 1986

    International Nuclear Information System (INIS)

    1987-03-01

    This report presents summaries of the research work performed during Fiscal Year 1986 by laboratories and organizations under contracts administered by the NRC's Materials Branch, Office of Nuclear Regulatory Research. Each contractor has written a more complete and detailed annual report of their work which can be obtained by writing to NRC; however, we believe it is useful to have a summary of each contractor's efforts for the year combined into one volume

  7. 48 CFR 916.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ..., output, be it hardware, research and development, demonstration or services, together with business... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 916.405-2 Cost-plus-award-fee... appropriate) and business management considerations tailored to the needs of the particular situation. In...

  8. Multivariate analysis of electrical impedance spectra for relaxed and contracted skeletal muscle

    International Nuclear Information System (INIS)

    Zagar, T; Krizaj, D

    2008-01-01

    Four-electrode impedance spectra of relaxed and contracted muscle biceps brachii were analyzed in an adult human subject over the frequency range from 300 Hz to 75 kHz. A feasibility of the principal component analysis of bioimpedance measurement for the evaluation of skeletal muscle contractile state was examined. The principal components score plots show a data grouping of the impedance spectra from the two muscle groups. The classification was performed using a soft independent modeling of class analogy (SIMCA) method. The data set comprised 32 samples (16 samples of contracted muscle and 16 samples of relaxed muscle). The leave-one-out test of the classification yields about 80% of correctly classified samples (11 samples for contracted and 15 samples for relaxed muscle)

  9. SSC Test Operations Contract Overview

    Science.gov (United States)

    Kleim, Kerry D.

    2010-01-01

    This slide presentation reviews the Test Operations Contract at the Stennis Space Center (SSC). There are views of the test stands layouts, and closer views of the test stands. There are descriptions of the test stand capabilities, some of the other test complexes, the Cryogenic propellant storage facility, the High Pressure Industrial Water (HPIW) facility, and Fluid Component Processing Facility (FCPF).

  10. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  11. Psychological Contract Development: An Integration of Existing Knowledge to Form a Temporal Model

    Directory of Open Access Journals (Sweden)

    Kelly Windle

    2014-07-01

    Full Text Available The psychological contract has received substantial theoretical attention over the past two decades as a popular framework within which to examine contemporary employment relationships. Previous research mostly examines breach and violation of the psychological contract and its impact on employee organization outcomes. Few studies have employed longitudinal, prospective research designs to investigate the psychological contract and as a result, psychological contract content and formation are incompletely understood. It is argued that employment relationships may be better proactively managed with greater understanding of formation and changes in the psychological contract. We examine existing psychological contract literature to identify five key factors proposed to contribute to the formation of psychological contracts. We extend the current research by integrating these factors for the first time into a temporal model of psychological contract development.

  12. Research program Integrity of Components (FKS). A substantial contribution to component safety

    International Nuclear Information System (INIS)

    Kussmaul, K.; Roos, E.; Foehl, J.

    1998-01-01

    The main objectives pursued are: (a) verify the quality of reactor pressure vessels in existing LWR-type reactors, and (b) quantify the safety margin using both specified and non-specified materials and welds. On the basis of knowledge obtained through earlier programmes, the research project was to examine in particular deviations from the specified materials properties, for more exact quantification of the safety margin before RPV failure. There are three major factors influencing the component performance until failure, which are aggregate material fatigue, flaws, loading conditions, and the research work was to focus on the materials properties. An item of main interest was to assess the impact of long service life on the materials properties, assuming particularly unfavourable boundary conditions for materials properties and operational loads. (orig./CB) [de

  13. Multi-scale analysis of deformation behavior at SCC crack tip (3) (Contract research)

    International Nuclear Information System (INIS)

    Kaji, Yoshiyuki; Miwa, Yukio; Tsukada, Takashi; Hayakawa, Masao; Nagashima, Nobuo

    2008-08-01

    In recent years, incidents of the stress corrosion cracking (SCC) were frequently reported that occurred to the various components of domestic boiling water reactors (BWR), and the cause investigation and measure become the present important issue. By the Japan nuclear energy safety organization (JNES), a research project on the intergranular SCC (IGSCC) in nuclear grade stainless steels (henceforth, IGSCC project) is under enforcement from a point of view to secure safety and reliability of BWR, and SCC growth data of low carbon stainless steels are being accumulated for the weld part or the work-hardened region adjacent to the weld metal. In the project, it has been an important subject to guarantee the validity of accumulated SCC data. At a crack tip of SCC in compact tension (CT) type specimen used for the SCC propagation test, a macroscopic plastic region is formed where heterogeneity of microstructure developed by microscopic sliding and dislocations is observed. However, there is little quantitative information on the plastic region, and therefore, to assess the data of macroscopic SCC growth rate and the validity of propagation test method, it is essentially required to investigate the plastic region at the crack tip in detail from a microscopic viewpoint. This report describes a result of the research conducted by the Japan Atomic Energy Agency and the National Institute for Materials Science under contract with JNES that was concerned with a multi-scale analysis of plastic deformation behavior at the crack tip of SCC. The research was carried out to evaluate the validity of the SCC growth data acquired in the IGSCC project based on a mechanistic understanding of SCC. For the purpose, in this research, analyses of the plastic deformation behavior and microstructure around the crack tip were performed in a nano-order scale. The hardness measured in nano, meso and macro scales was employed as a common index of the strength, and the essential data necessary

  14. The role of research programs and commercial contracts for increase of economic competitiveness and development at INR Pitesti

    International Nuclear Information System (INIS)

    Petra, Nicoleta Mihaela; Ionila, Maria; Datcu, Mirela; Balan, Iosif Bogdan; Cretu, Ileana

    2008-01-01

    In the period in which globalization is increasing, one of the strategic objectives of the institute is to focus on those activities which help developing of services, products and technologies, applicable in nuclear industry, environment protection and medicine. One way to sustain INR activity is the technological transfer which ensures availability of research results by carrying out of R and D contracts in priority areas and of contracts with economical agents for the supply of services, products, technologies, such as: - Materials irradiation for medicine, industry and research; - Neutron Activation Analysis (NAA) and prompt gamma spectrometry for Cernavoda NPP - Unit 1; - Control and testing: non-destructive examination, functional tests of samples and equipment from Cernavoda NPP - Unit 1; - Characterization, conditioning and treatment of radioactive wastes for NPP- Cernavoda, Unit 1, Nuclear Fuel Plant (FCN) - Pitesti; - Measurement of isotopes concentration in environmental samples; -Corrosion experiments in static autoclaves and experiments regarding microbial corrosion for NPP Cernavoda Unit 1 and FCN Pitesti; - Nuclear consultancy for Cernavoda NPP - Unit 1 and Unit 2; - Stainless steel casks for radwaste; - Containers for heavy water; - Training and practice for students at the Universities of Pitesti, Bucuresti, Brasov. The paper presents the main areas where the results obtained in R and D programs can be applied, their implementation can be done, and the status of contracts and their importance for INR Pitesti and Romanian society development, as well. (authors)

  15. Future Contract Selection by Term Structure Analysis

    Directory of Open Access Journals (Sweden)

    Vasco Grossmann

    2017-07-01

    Full Text Available In futures markets, a single asset is generally represented by several contracts with different maturities. The selection of specific contracts is an inevitable task that also creates new opportunities, especially in terms of speculative trading. Evaluating immediate and upcoming trading costs for all considered contracts might lead to a significantly improved performance. Among that, even possible market inefficiencies might be taken into consideration. This research introduces and evaluates a new algorithm for the contract selection. The results are benchmarked and compared with established methods using a Monte Carlo simulation on different commodity and index futures.

  16. Ferox is awarded another contract by CERN

    CERN Multimedia

    2002-01-01

    Ferox, manufacturer of equipment for the chemical industry, has been awarded a second contract by the physical research centre CERN (Switzerland). The contract regards the delivery of 10 pcs of stainless containers for liquid nitrogen and argon with a capacity of 50 cu mt (1 paragraph).

  17. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  18. Research of application of new material to light water reactor components

    International Nuclear Information System (INIS)

    Mihara, Tanetoyo

    1992-01-01

    Advanced Nuclear Equipment Research Institute (ANERI) has been doing the research to apply the new material including metal, fine ceramics and high polymer which were developed and applied in other industries to components and parts of light water reactor for the purpose of Improvement of reliability of components, improvement of efficiency of periodic inspection, improvement of repair and reduction of radiation exposure of worker. This project started upon the sponsorship of Ministry of International Trade and Industry (MITI) by the schedule of FY1985-FY1993 (9 years) and effective results has been obtained. (author)

  19. Nuclear plant aging research - an overview (electrical and mechanical components)

    International Nuclear Information System (INIS)

    Vora, J.P.

    1985-01-01

    As the operating nuclear power plants advance in age there must be a conscious national and international effort to understand the influence and safety implications of aging and service wear of components and structures in nuclear power plants and develop measures which are practical and cost effective for timely mitigation of aging degradation that could significantly affect plant safety. The Office of Nuclear Regulatory Research has, therefore, initiated a multi-year, multi-disciplinary program on Nuclear Plant Aging Research (NPAR). The overall goals identified for the program are as follows: 1) to identify and characterize aging and service wear effects associated with electrical and mechanical components, interfaces, and systems whose failure could impair plant safety; 2) to identify and recommend methods of inspection, surveillance and condition monitoring of electrical and mechanical components and systems which will be effective in detecting significant aging effects prior to loss of safety function so that timely maintenance and repair or replacement can be implemented; and, 3) to identify and recommend acceptable maintenance practices which can be undertaken to mitigate the effects of aging and to diminish the rate and extent of degradation caused by aging and service wear. The specific research activities to be implemented to achieve these goals are described

  20. Ageing investigation and upgrading of components/systems of Kartini research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Syarip,; Setiawan, Widi [Yogyakarta Nuclear Research Centre, Yogyakarta (Indonesia)

    1998-10-01

    Kartini research reactor has been operated in good condition and has demonstrated successful operation for the past 18 years, utilized for: reactor kinetic and control studies, instrumentation tests, neutronic and thermohydraulic studies, routine neutron activation analysis, reactor safety studies, training for research reactor operators and supervisors, and reactor physics experiments. Several components of Kartini reactor use components from the abandoned IRT-2000 Project at Serpong and from Bandung Reactor Centre such as: reactor tank, reactor core, heat exchanger, motor blower for ventilation system, fuel elements, etc. To maintain a good operating performance and also for aging investigation purposes, the component failure data collection has been done. The method used is based on the Manual on Reliability Data Collection For Research Reactor PSAs, IAEA TECDOC 636, and analyzed by using Data Entry System (DES) computer code. Analysis result shows that the components/systems failure rate of Kartini reactor is around 1,5.10{sup -4} up to 2,8.10{sup -4} per hour, these values are within the ranges of the values indicated in IAEA TECDOC 478. Whereas from the analysis of irradiation history shows that the neutron fluence of fuel element with highest burn-up (2,05 gram U-235 in average) is around 1.04.10{sup 16} n Cm{sup -2} and this value is still far below its limiting value. Some reactor components/systems have been replaced and upgraded such as heat exchanger, instrumentation and control system (ICS), etc. The new reactor ICS was installed in 1994 which is designed as a distributed structure by using microprocessor based systems and bus system technology. The characteristic and operating performance of the new reactor ICS, as well as the operation history and improvement of the Kartini research reactor is presented. (J.P.N.)

  1. 48 CFR 227.7103-6 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... software or computer software documentation (see 227.72), commercial items (see 227.7102-3), existing works...-engineer and construction contracts. (b)(1) Use the clause at 252.227-7013 with its Alternate I in research... Software Previously Delivered to the Government, in solicitations when the resulting contract will require...

  2. The application of the psychological contract to workplace safety.

    Science.gov (United States)

    Walker, Arlene; Hutton, Dorothy M

    2006-01-01

    Psychological contracts of safety are conceptualized as the beliefs of individuals about reciprocal safety obligations inferred from implicit or explicit promises. Although the literature on psychological contracts is growing, the existence of psychological contracts in relation to safety has not been established. The research sought to identify psychological contracts in the conversations of employees about safety, by demonstrating reciprocity in relation to employer and employee safety obligations. The identified safety obligations were used to develop a measure of psychological contracts of safety. The participants were 131 employees attending safety training sessions in retail and manufacturing organizations. Non-participant observation was used to collect the data during safety training sessions. Content analysis was used to analyze the data. Categories for coding were established through identification of language markers that demonstrated contingencies or other implied obligations. Direct evidence of reciprocity between employer safety obligations and employee safety obligations was found in statements from the participants demonstrating psychological contracts. A comprehensive list of perceived employer and employee safety obligations was compiled and developed into a measure of psychological contracts of safety. A small sample of 33 safety personnel was used to validate the safety obligations. CONCLUSIONS AND IMPACT ON INDUSTRY: Implications of these findings for safety and psychological contract research are discussed.

  3. Investigation regarding the amount of disused components and the radioactive inventory at Mutsu Establishment, JAERI

    International Nuclear Information System (INIS)

    Hatanaka, Kazuo; Ooeda, Etsurou; Watanabe, Masaaki

    2003-01-01

    About 200 tons of the disused components, which were used for fuel removal, are stored in Mutsu Establishment, Japan Atomic Energy Research Institute (JAERI). In order to settle the decommissioning plan, RANDEC made an investigation regarding the amount of disused components and the radioactive inventory in Mutsu Establishment under a contract with JAERI. This report describes the estimation results of radioactive inventory and weight of radioactive wastes regarding the disused equipment such as an ion-exchange resin tank, a injection pump and equipment for fuel removal. (author)

  4. A plan for safety and integrity of research reactor components

    International Nuclear Information System (INIS)

    Moatty, Mona S. Abdel; Khattab, M.S.

    2013-01-01

    Highlights: ► A plan for in-service inspection of research reactor components is put. ► Section XI of the ASME Code requirements is applied. ► Components subjected to inspection and their classes are defined. ► Flaw evaluation and its acceptance–rejection criteria are reviewed. ► A plan of repair or replacement is prepared. -- Abstract: Safety and integrity of a research reactor that has been operated over 40 years requires frequent and thorough inspection of all the safety-related components of the facility. The need of increasing the safety is the need of improving the reliability of its systems. Diligent and extensive planning of in-service inspection (ISI) of all reactor components has been imposed for satisfying the most stringent safety requirements. The Safeguards Officer's responsibilities of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code ASME Code have been applied. These represent the most extensive and time-consuming part of ISI program, and identify the components subjected to inspection and testing, methods of component classification, inspection and testing techniques, acceptance/rejection criteria, and the responsibilities. The paper focuses on ISI planning requirements for welded systems such as vessels, piping, valve bodies, pump casings, and control rod-housing parts. The weld in integral attachments for piping, pumps, and valves are considered too. These are taken in consideration of safety class (1, 2, 3, etc.), reactor age, and weld type. The parts involve in the frequency of inspection, the examination requirements for each inspection, the examination method are included. Moreover the flaw evaluation, the plan of repair or replacement, and the qualification of nondestructive examination personnel are considered

  5. High-temperature-structural design and research and development for reactor system components

    International Nuclear Information System (INIS)

    Matsumura, Makoto; Hada, Mikio

    1985-01-01

    The design of reactor system components requires high-temperature-structural design guide with the consideration of the creep effect of materials related to research and development on structural design. The high-temperature-structural design guideline for the fast prototype reactor MONJU has been developed under the active leadership by Power Reactor and Nuclear Fuel Development Corporation and Toshiba has actively participated to this work with responsibility on in-vessel components, performing research and development programs. This paper reports the current status of high-temperature-structural-design-oriented research and development programs and development of analytical system including stress-evaluation program. (author)

  6. INFLUENCE FACTORS FOR LEASING MARKET CONTRACTS

    Directory of Open Access Journals (Sweden)

    Oana BĂRBULESCU

    2016-11-01

    Full Text Available This paper aims to investigate the relationship between leasing contracts and some factors that influence the value of these contracts. In order to do this, we have decided on some quantitative marketing research by appealing to statistics for accomplishing the objectives that we have set: to find a correlation between the turnover percentage assigned to leasing expenses and several influence factors. This study indicated that the more contracts are signed by a firm, the more likely is to assign a bigger fraction of the income to each new leasing contract. The study confirmed that bigger companies are relying more on leasing as a way of financing than small companies. This study also discovered that companies with more employees are using larger contracts in order to sustain their activity. The findings are expected to contribute to adjusting the offers by the leasing companies, taking into consideration these factors and to using these factors in order to better predict the market evolution.

  7. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  8. Formalization in Component Based Development

    DEFF Research Database (Denmark)

    Holmegaard, Jens Peter; Knudsen, John; Makowski, Piotr

    2006-01-01

    We present a unifying conceptual framework for components, component interfaces, contracts and composition of components by focusing on the collection of properties or qualities that they must share. A specific property, such as signature, functionality behaviour or timing is an aspect. Each aspect...... may be specified in a formal language convenient for its purpose and, in principle, unrelated to languages for other aspects. Each aspect forms its own semantic domain, although a semantic domain may be parameterized by values derived from other aspects. The proposed conceptual framework is introduced...

  9. 48 CFR 1835.070 - NASA contract clauses and solicitation provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clauses and....070 NASA contract clauses and solicitation provision. (a) The contracting officer shall insert the... ensure that the provision at 1852.235-72, Instructions for Responding to NASA Research Announcements, is...

  10. NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project

    Science.gov (United States)

    Wilson, Scott D.; Wong, Wayne A.

    2015-01-01

    A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.

  11. Court Cases Involving Contracts for School Districts

    Science.gov (United States)

    Allen, L. Hank

    2011-01-01

    The purpose of this research was to analyze trends in the United States regarding contract disputes that exist in school districts. Court cases were identified at the state and federal level to determine the outcomes and the fact patterns of contract disputes. To gain the knowledge of how courts handle cases of contractual breach, contracts…

  12. The Brent Contract for Differences (CFD)

    International Nuclear Information System (INIS)

    Barrera-Rey, F.; Seymour, A.

    1996-01-01

    The market for Brent Contracts-for-Differences (CFDs) emerged as early as 1988 but its significant development did not occur until 1992. By financial market standards, however, this span of life is fairly long. Yet the characteristics and role of this oil trading instrument have not been seriously studied. This study aims at filling a gap in research on the Brent market complex which includes spot trades, a 15-day forward and futures contracts, various derivatives and, finally, the less well documented CFD. Chapters 2 and 3 aim to describe and explain the characteristics of the CFD market, in particular the evolution in contract terms and the composition of participants. (UK)

  13. Empirical scholarship in contract law: possibilities and pitfalls

    Directory of Open Access Journals (Sweden)

    Russell Korobkin

    2015-01-01

    Full Text Available Professor Korobkin examines and analyzes empirical contract law scholarship over the last fifteen years in an attempt to guide scholars concerning how empiricism can be used in and enhance the study of contract law. After defining the parameters of the study, Professor Korobkin categorizes empirical contract law scholarship by both the source of data and main purpose of the investigation. He then describes and analyzes three types of criticisms that can be made of empirical scholarship, explains how these criticisms pertain to contract law scholarship, and considers what steps researchers can take to minimize the force of such criticisms.

  14. RESIDUAL VALUE RISK IN AUTOMOTIVE OPERATING LEASE CONTRACTS

    Directory of Open Access Journals (Sweden)

    Ivan Tot

    2017-01-01

    Full Text Available The subject of the research in this paper are automotive operating lease contracts in the Croatian business practice. The provisions of the general terms and conditions for operating lease contracts of the Croatian leasing companies are being analysed, particulary those relating to the rights and obligations of the parties to the contract after the operating lease contract was terminated and the motor vehicle returned to the lessor. The existence of three contractual models of the automotive operating lease contract in the Croatian business practice is established, which vary with regard to the assignment and the distribution of the residual value risk. Those contractual models are being compared with the two most common contractual models of automotive lease contracts in the Austrian and German business practice: the lease contract with the excess mileage adjustment and the lease contract with the terminal rent adjustment. On the basis of the results of this comparison, applicability of the legal solutions, developed in the Austrian and German jurisprudence and legal literature regarding the lease contract with the excess mileage adjustment and the lease contract with the terminal rent adjustment, to the automotive operating lease contract within the framework of Croatian law, is being examinded.

  15. Options for change in the NHS consultant contract.

    Science.gov (United States)

    Clarke, R W; Gray, C

    The lead negotiators for the management and consultant sides in an NHS trust in northern England responded to debate in their trust about consultant contracts by offering to research the attitudes of their peers towards a variety of contract options. The options tested included the current contract; models already examined in the trust and elsewhere, such as time sensitive and mild performance related contracts; and some more radical and speculative possibilities, including consultants franchising their services to the trust. Beyond the predictable conclusion that consultants would prefer no change while managers desired it, a time sensitive contract emerged as having potential for successful negotiation. On the other hand, neither consultants nor managers favoured a strict performance related contract or a fee for service contract. There was a strong similarity of opinion between the two groups on the relative salary values of the options, though the consultants consistently priced these higher than the managers.

  16. Comparison of two text message (mHealth) campaigns for the Deaf: Contracted out v. conducted in-house.

    Science.gov (United States)

    Hacking, Damian; Lau, Yan Kwan; Haricharan, Hanne Jensen; Heap, Marion

    2015-11-20

    Cell phone-based health information (mobile health or mHealth) campaigns are an emerging technology. This evaluation focused on the aspect of cost of two health information campaigns, one on hypertension and one on pregnancy. Researchers could either contract out the technical components of the campaigns or attempt to run the campaigns themselves, in-house. The in-house campaigns cost an estimated ZAR13 548.72 v. the private provider quotes which ranged from ZAR27 542.97 to ZAR34 227.59. Running the campaigns in-house was more labour intensive and required more technical expertise, but had a reduced delivery failure rate (9.2% in-house v. 30.0% private provider). Running small to medium SMS (text message) campaigns for evaluative purposes proved advantageous over contracting out to private providers. Larger-scale evaluations and full-scale roll-out will require the services of private providers, but it is still essential that researchers actively engage with and monitor the technical aspects of these campaigns.

  17. Radiation research contracts: Distribution of fission products in the biosphere

    International Nuclear Information System (INIS)

    Schoenfeld, T.

    1959-01-01

    According to its Statute the IAEA has to fulfil a dual function - to help individual countries in solving their specific problems and to undertake tasks in the common interest of all its Member States. With this latter aim in mind the Agency has placed a number of research contracts with national research institutes. One of them deals with the distribution of fission products in the biosphere. The Agency has contributed to this work by putting at the institutes' disposal scientists from its own staff apparatus and financial aid. Protection against ionizing radiation given off in nuclear transformations is one of the foremost safety problems in all atomic energy operations. While every effort is being made to prevent reactors, processing plants and all other installations from releasing radioactive materials into the biosphere - air, water and earth - under any foreseeable conditions, small amounts of it are actually released into man's living space. Undoubtedly, this will continue to be so, at least for the time being. For example, low activity liquid wastes from some chemical processing plants are decontaminated in special processes, but traces of fission products remain in the liquids finally discharged on the ground or to nearby waterways. In some installations low and medium activity liquid wastes are even released on the ground or into swamps without prior decontamination. It is also to be expected that in accidents larger amounts of fission products may occasionally be released. (author)

  18. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  19. Power Generation and Transportation Systems Research Department: 1992 annual status report (Gas Research Institute)

    International Nuclear Information System (INIS)

    Benedict, A.

    1992-09-01

    Activities of Gas Research Institute's Power Generation and Transportation Systems subprogram for the period between October 1, 1991 and September 30, 1992 are summarized. The particular project areas covered in the report are Cogeneration and Power Systems, Engine Technology and Component Development, Natural Gas Vehicles Research, and Electric Power Generation. For each project area a separate chapter is provided. Each chapter includes a rationale for funding the research effort, the goals and objectives to be achieved, a general statement on research accomplishments, and the strategy employed in the project area. Each chapter also contains a series of summary reports on the status of each contract

  20. Contract Design: Financial Options and Risk.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of distinct insured clientele

  1. Contracting for Complex Products

    Science.gov (United States)

    2010-05-01

    asymmetries, and barriers to market entry and exit (e.g., Mankiw , et al., 2002). Goods may be non-rivalrous or non-excludable so that transferable property...investments. Expenditures are asset specific to the extent they have no economic value outside the product being produced (Williamson, 2005). For...example, some research in the US space program produced economic value outside the contract (e.g., Tang), while other research produced little value

  2. Study on system layout and component design in the HTTR hydrogen production system. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Nishihara, Tetsuo; Shimizu, Akira [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Tanihira, Masanori [Mitsubishi Heavy Industries Ltd., Tokyo (Japan); Uchida, Shoji [Advanced Reactor Technology Co., Ltd., Tokyo (Japan)

    2003-01-01

    The global warming becomes a significant issue in the world so that it needs to reduce the CO{sub 2} emission. It is expected that hydrogen is in place of the fossil fuels such as coal and oil, and plays the important role to resolve the global warming. There are several hydrogen making processes such as water electrolysis and steam reforming of hydrocarbon. Steam reforming of hydrocarbon is a major hydrogen making process because of economy in industry. It utilizes the fossil fuels as process heat for chemical reaction and results in a large CO{sub 2} emission. New steam reforming system without fossil fuel can contribute to resolve the global warming. High temperature gas-cooled reactor (HTGR) has a unique feature to be able to supply a hot helium gas whose temperature is approximately 950degC at the reactor outlet. This makes HTGR possible to utilize for not only power generation but also process heat utilization. JAERI constructed the high temperature engineering test reactor (HTTR) that is a sort of HTGR in Oarai establishment and starts operation. Nuclear heat utilization is one of the R and D items of the HTTR. The steam reforming system coupling to the HTTR for hydrogen production has been designed. This report represents the system layout and design specification of key components in HTTR steam reforming system. (author)

  3. Study on system layout and component design in the HTTR hydrogen production system. Contract research

    International Nuclear Information System (INIS)

    Nishihara, Tetsuo; Shimizu, Akira; Uchida, Shoji

    2003-01-01

    The global warming becomes a significant issue in the world so that it needs to reduce the CO 2 emission. It is expected that hydrogen is in place of the fossil fuels such as coal and oil, and plays the important role to resolve the global warming. There are several hydrogen making processes such as water electrolysis and steam reforming of hydrocarbon. Steam reforming of hydrocarbon is a major hydrogen making process because of economy in industry. It utilizes the fossil fuels as process heat for chemical reaction and results in a large CO 2 emission. New steam reforming system without fossil fuel can contribute to resolve the global warming. High temperature gas-cooled reactor (HTGR) has a unique feature to be able to supply a hot helium gas whose temperature is approximately 950degC at the reactor outlet. This makes HTGR possible to utilize for not only power generation but also process heat utilization. JAERI constructed the high temperature engineering test reactor (HTTR) that is a sort of HTGR in Oarai establishment and starts operation. Nuclear heat utilization is one of the R and D items of the HTTR. The steam reforming system coupling to the HTTR for hydrogen production has been designed. This report represents the system layout and design specification of key components in HTTR steam reforming system. (author)

  4. Reflections on Teaching and Research: Two Inseparable Components in Higher Education

    Science.gov (United States)

    Chan Fong Yee, Fanny

    2014-01-01

    Teaching and research are two inseparable components in higher education. There are continuous debates about the relationship between the two. Does good teaching always lead to good research, and vice versa? This paper critically examines the impact of current policy on the two academic practices and discusses how it shapes one's professional…

  5. Review of 20 years research in fatigue of high pressure loaded components

    Energy Technology Data Exchange (ETDEWEB)

    Thumser, Rayk [Bauhaus Univ. Weimar (Germany). Materialforschungs- und -pruefanstalt; Scheibe, Wolfgang

    2011-07-01

    This paper gives an overview of the research in fatigue of high pressure loaded components. In the last 20 years the main research was carried out in Germany. This research was mainly driven by the fatigue requirements for high pressure loaded Diesel engine injection parts as common rails, injectors and pipes. (orig.)

  6. Determinants of Service Contract Outcomes

    Science.gov (United States)

    2011-04-30

    5–24. Armstrong, J. S., & Overton, T. S. (1977). Estimating nonresponse bias in mail surveys. Journal of Marketing Research , 14(3), 396–402. Ausink...for developing better measures of marketing constructs. Journal of Marketing Research , 16(1), 64–73. Coalition of Service Industries (CSI). (2007...with unobservable variables and measurement error. Journal of Marketing Research , 18, 39–50. GAO. (2001a, May). Contract management: Trends and

  7. Turnaround Time and Market Capacity in Contract Cheating

    Science.gov (United States)

    Wallace, Melisa J.; Newton, Philip M.

    2014-01-01

    Contract cheating is the process whereby students auction off the opportunity for others to complete assignments for them. It is an apparently widespread yet under-researched problem. One suggested strategy to prevent contract cheating is to shorten the turnaround time between the release of assignment details and the submission date, thus making…

  8. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  9. Final report on the IAEA research contracts No. 1194/RB, 1194/R1/RB and 1194/R2/RB

    International Nuclear Information System (INIS)

    Zobor, E.; Janosy, J.S.; Szentgali, A.

    1980-09-01

    The final report summarizes the research activities made in the framework of the IAEA Research Contracts No. 1194/RB, 1194/R1/RB and 1194/R2/RB. A multilevel hierarchical control system is treated which uses weakly-coupled low dimensional subsystems under the supervision of a dynamic coordinator program. This self-organizing adaptive control system was checked by a 5 MW research reactor. As an example the paper describes the experimental computer control system of the 5 MW WWR-SM research reactor, where the reactor power and outlet temperature have been controlled on the basis of the treated control concept since 1978. (author)

  10. Dynamics of psychological contracts with work engagement and turnover intention: the influence of organizational tenure

    NARCIS (Netherlands)

    Bal, P.M.; de Cooman, R.; Mol, S.T.

    2013-01-01

    This study investigated the interrelations of the psychological contract with work engagement and turnover intention, which has hitherto been a largely overlooked topic in psychological contract research. Although previous research has mainly focused on how psychological contracts influence job

  11. The regulation of peculiarities of electronic contracting: comparative analysis

    Directory of Open Access Journals (Sweden)

    Наталія Юліївна Філатова

    2017-12-01

    Full Text Available Contract formation by electronic means nowadays is a widespread phenomenon. Nevertheless electronic contracting has been thoroughly explored by scholars all over the world and regulated both internationally and domestically, there still remain some issues which need to be carefully analyzed. In our view, the most essential question raised by electronic contracting is whether there is a need to amend substantial contract law provisions with regard to peculiarities of contracts concluded by electronic means. Seeking the answer to this question several approaches have been formulated, but none of them seems to be completely appropriate. In this paper the answer is also attempted to be found. For this purpose a comparative analysis of doctrine, legislation and judicial practice of certain states is performed. Particularly, offer, acceptance and moment of electronic contract formation are explored. On the basis of this research the following conclusion is done: amendments to substantial contract law provisions are not always necessary to improve the regulation of electronic contracting. Nevertheless the provisions of law should be applied correctly to the disputes arising from electronic contract formation taking into account the peculiarities of such contracts.

  12. Research on development model of nuclear component based on life cycle management

    International Nuclear Information System (INIS)

    Bao Shiyi; Zhou Yu; He Shuyan

    2005-01-01

    At present the development process of nuclear component, even nuclear component itself, is more and more supported by computer technology. This increasing utilization of the computer and software has led to the faster development of nuclear technology on one hand and also brought new problems on the other hand. Especially, the combination of hardware, software and humans has increased nuclear component system complexities to an unprecedented level. To solve this problem, Life Cycle Management technology is adopted in nuclear component system. Hence, an intensive discussion on the development process of a nuclear component is proposed. According to the characteristics of the nuclear component development, such as the complexities and strict safety requirements of the nuclear components, long-term design period, changeable design specifications and requirements, high capital investment, and satisfaction for engineering codes/standards, the development life-cycle model of nuclear component is presented. The development life-cycle model is classified at three levels, namely, component level development life-cycle, sub-component development life-cycle and component level verification/certification life-cycle. The purposes and outcomes of development processes are stated in detailed. A process framework for nuclear component based on system engineering and development environment of nuclear component is discussed for future research work. (authors)

  13. 48 CFR 1552.242-72 - Financial administrative contracting officer.

    Science.gov (United States)

    2010-10-01

    ... Administrative Contracting Officer (FACO) is responsible for performing certain post-award functions related to the financial aspects of this contract when the EPA is the cognizant federal agency. These functions...) Negotiate advance agreements applicable to treatment of costs and to Independent Research & Development/Bid...

  14. User's manual and analysis methodology of probabilistic fracture mechanics analysis code PASCAL Ver.2 for reactor pressure vessel (Contract research)

    International Nuclear Information System (INIS)

    Osakabe, Kazuya; Onizawa, Kunio; Shibata, Katsuyuki; Kato, Daisuke

    2006-09-01

    As a part of the aging structural integrity research for LWR components, the probabilistic fracture mechanics (PFM) analysis code PASCAL (PFM Analysis of Structural Components in Aging LWR) has been developed in JAEA. This code evaluates the conditional probabilities of crack initiation and fracture of a reactor pressure vessel (RPV) under transient conditions such as pressurized thermal shock (PTS). The development of the code has been aimed to improve the accuracy and reliability of analysis by introducing new analysis methodologies and algorithms considering the recent development in the fracture mechanics and computer performance. PASCAL Ver.1 has functions of optimized sampling in the stratified Monte Carlo simulation, elastic-plastic fracture criterion of the R6 method, crack growth analysis models for a semi-elliptical crack, recovery of fracture toughness due to thermal annealing and so on. Since then, under the contract between the Ministry of Economy, Trading and Industry of Japan and JAEA, we have continued to develop and introduce new functions into PASCAL Ver.2 such as the evaluation method for an embedded crack, K I database for a semi-elliptical crack considering stress discontinuity at the base/cladding interface, PTS transient database, and others. A generalized analysis method is proposed on the basis of the development of PASCAL Ver.2 and results of sensitivity analyses. Graphical user interface (GUI) including a generalized method as default values has been also developed for PASCAL Ver.2. This report provides the user's manual and theoretical background of PASCAL Ver.2. (author)

  15. Contract Design: Risk Management and Evaluation.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent's returns on the provider's gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment have widely differing model and forecast

  16. Safety classification of systems, structures, and components for pool-type research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Ryong [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2016-08-15

    Structures, systems, and components (SSCs) important to safety of nuclear facilities shall be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety functions. Although SSC classification guidelines for nuclear power plants have been well established and applied, those for research reactors have been only recently established by the International Atomic Energy Agency (IAEA). Korea has operated a pool-type research reactor (the High Flux Advanced Neutron Application Reactor) and has recently exported another pool-type reactor (Jordan Research and Training Reactor), which is being built in Jordan. Korea also has a plan to build one more pool-type reactor, the Kijang Research Reactor, in Kijang, Busan. The safety classification of SSCs for pool-type research reactors is proposed in this paper based on the IAEA methodology. The proposal recommends that the SSCs of pool-type research reactors be categorized and classified on basis of their safety functions and safety significance. Because the SSCs in pool-type research reactors are not the pressure-retaining components, codes and standards for design of the SSCs following the safety classification can be selected in a graded approach.

  17. Marine Corps Contract Supply Model for High Quality Male Enlistment Contracts at the Recruiting Sub Station Level

    National Research Council Canada - National Science Library

    Welsh, Brian K

    2008-01-01

    .... This research develops contract production models at the Recruiting Sub Station level to estimate the effects of local economic conditions, demographics, and recruiting resources on new high quality...

  18. Contract Design: The problem of information asymmetry

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries.  Methods: A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation.  Results: Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection and after conclusion of a contract (moral hazard.  Discussion and Conclusions: Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved

  19. Contract Design: The problem of information asymmetry.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation. Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete) contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection) and after conclusion of a contract (moral hazard). Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved at no-costs. The presented problems in the design of selective individual contracts

  20. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  1. FACTORS INFLUENCING THE ACCURACY OF PRE-CONTRACT STAGE ESTIMATION OF FINAL CONTRACT PRICE IN NEW ZEALAND

    Directory of Open Access Journals (Sweden)

    Cong Ji

    2014-12-01

    Full Text Available Establishing and prioritising the factors that may influence the final contract price when responding to a call for tenders is crucial for proper risk analysis and reliable forecasting; it could make or mar the ability to achieve expected profit margin in an era of lump sum fixed price contracts where clients often contest variation claims. In New Zealand, these factors have not been researched; hence estimators rely only on judgement to ‘guess-estimate’ in their price forecasting. This study aimed to fill the knowledge gap by investigating the priority factors. 150 responses from professional members of the New Zealand Institute of Quantity Surveyors were analysed using multi-attribute method. Results showed thirty-seven factors which could influence the final contract price; the three most influential being poor tender documentation, complexity of design & construction, and completeness of project information. Other factors relating to project, client and contractor characteristics, design consultants and tendering conditions, estimating practice and external factors were reported. Concordance analysis indicated high level of agreement amongst survey participants in the rank-ordering of the relative importance of the identified factors. The findings could assist quantity surveyors to prepare more reliable contract price estimates at the pre-contract stage. It would also improve construction-stage cost control.

  2. Lack of symmetry in employees' perceptions of the psychological contract.

    Science.gov (United States)

    Jepsen, Denise M; Rodwell, John J

    2012-06-01

    Despite debate on the nature of employees' perceptions of their psychological contract, little research has compared employees' and employers' sides of the psychological contract. All 80 items from both scales in the Psychological Contract Inventory were used in a survey of 436 currently working, non-student respondents. Structural equation modeling yielded nonsymmetrical perspectives on promises and obligations, highlighting the validity of approaching the issues via individual perceptions.

  3. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  4. Modeling Psychological Contract Violation using Dual Regime Models: An Event-based Approach

    Directory of Open Access Journals (Sweden)

    Joeri Hofmans

    2017-11-01

    Full Text Available A good understanding of the dynamics of psychological contract violation requires theories, research methods and statistical models that explicitly recognize that violation feelings follow from an event that violates one's acceptance limits, after which interpretative processes are set into motion, determining the intensity of these violation feelings. Whereas theories—in the form of the dynamic model of the psychological contract—and research methods—in the form of daily diary research and experience sampling research—are available by now, the statistical tools to model such a two-stage process are still lacking. The aim of the present paper is to fill this gap in the literature by introducing two statistical models—the Zero-Inflated model and the Hurdle model—that closely mimic the theoretical process underlying the elicitation violation feelings via two model components: a binary distribution that models whether violation has occurred or not, and a count distribution that models how severe the negative impact is. Moreover, covariates can be included for both model components separately, which yields insight into their unique and shared antecedents. By doing this, the present paper offers a methodological-substantive synergy, showing how sophisticated methodology can be used to examine an important substantive issue.

  5. Variations in government contract in Malaysia

    Directory of Open Access Journals (Sweden)

    Jaspal Singh Nachatar

    2010-12-01

    Full Text Available The complexity of construction works means that it is hardly possible to complete a project without changes to the plans or the construction process itself. There can only be a minority of contracts of any size in which the subject matter when completed is identical in every respect with what was contemplated at the outset. As such, variations are inevitable in even the best-planned contracts. This study is attempted to examine the ways a variation was formed in law and project, in finding out whether the Standard Form of Contract used in Malaysia particularly the government Public Works Department (PWD form has been utilized to the best level in variation cases. Additionally, this study examined the benefits of variations to parties in contract and also provides suggestions and assumptions in an effort to contribute solutions to issues and problem detected. The research methodology used in this study was an extensive review of relevant literature, case study, empirical questionnaires and structured interviews and general observations based on experience and surroundings. The academic study approach incorporated stages such as initial understanding, data and information gathering, analysis of data, findings and conclusion and general suggestions in the study. The major findings of this study, among others, revealed that the existences of variations are common in projects. The main cause of variations was due to client request because of inadequate project objectives for the designer to develop comprehensive design. Besides, the analysis pointed out that the government form of contract the Public Works Department (PWD 203/203A can help in overcoming projects with variation because of the clear defined procedure. This study also found that proper planning and coordination at tender stage can minimize the risk of ‘unwanted’ variations. In conclusion, this study recommended that future research should be done in design and build based contract

  6. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  7. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  8. Materials and Components Technology Division research summary, 1991

    International Nuclear Information System (INIS)

    1991-04-01

    This division has the purpose of providing a R and D capability for design, fabrication, and testing of high-reliability materials, components, and instrumentation. Current divisional programs are in support of the Integral Fast Reactor, life extension for light water reactors, fuels development for the new production reactor and research and test reactors, fusion reactor first-wall and blanket technology, safe shipment of hazardous materials, fluid mechanics/materials/instrumentation for fossile energy systems, and energy conservation and renewables (including tribology, high- temperature superconductivity). Separate abstracts have been prepared for the data base

  9. Materials and Components Technology Division research summary, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This division has the purpose of providing a R and D capability for design, fabrication, and testing of high-reliability materials, components, and instrumentation. Current divisional programs are in support of the Integral Fast Reactor, life extension for light water reactors, fuels development for the new production reactor and research and test reactors, fusion reactor first-wall and blanket technology, safe shipment of hazardous materials, fluid mechanics/materials/instrumentation for fossile energy systems, and energy conservation and renewables (including tribology, high- temperature superconductivity). Separate abstracts have been prepared for the data base.

  10. Analysis of Government Accountability Office and Department of Defense Inspector General Reports and Commercial Sources on Service Contracts

    Science.gov (United States)

    2010-06-01

    Acquisition Research Program BIM Building Information Modeling COR Contracting Officer Representative DoD Department of Defense FPDS...WBS), performance work statements (PWS) and statement of work (SOW), market research, budget and cost estimates, determining contract type, and...contracting within this project. The recurrent best practices in contracting among all sources emphasized planning, defining requirements, market research

  11. Addendum to Final Audit Report on Contracting Practices for the Use and Operations of DoD-Sponsored Federally Funded Research and Development Centers

    National Research Council Canada - National Science Library

    1995-01-01

    Inspector General, DoD, Report No. 95-048, "Contracting Practices for the Use and Operations of DoD-Sponsored Federally Funded Research and Development Centers," December 2, 1994, was published without management comments...

  12. Inoenue-Wigner contraction and D = 2 + 1 supergravity

    Energy Technology Data Exchange (ETDEWEB)

    Concha, P.K.; Rodriguez, E.K. [Universidad Adolfo Ibanez, Departamento de Ciencias, Facultad de Artes Liberales, Vina del Mar (Chile); Universidad Austral de Chile, Instituto de Ciencias Fisicas y Matematicas, Valdivia (Chile); Fierro, O. [Universidad Catolica de la Santisima Concepcion, Departamento de Matematica y Fisica Aplicadas, Concepcion (Chile)

    2017-01-15

    We present a generalization of the standard Inoenue-Wigner contraction by rescaling not only the generators of a Lie superalgebra but also the arbitrary constants appearing in the components of the invariant tensor. The procedure presented here allows one to obtain explicitly the Chern-Simons supergravity action of a contracted superalgebra. In particular we show that the Poincare limit can be performed to a D = 2 + 1 (p,q) AdS Chern-Simons supergravity in presence of the exotic form. We also construct a new three-dimensional (2,0) Maxwell Chern-Simons supergravity theory as a particular limit of (2,0) AdS-Lorentz supergravity theory. The generalization for N = p + q gravitinos is also considered. (orig.)

  13. Modification of Personal Hygiene and Grooming Behaviors with Contingency Contracting: A Brief Review and Case Study.

    Science.gov (United States)

    Allen, Sarah J.; Kramer, Jack J.

    1990-01-01

    Presents discussion of basic components and characteristics of contingency contracts. Includes case study in which contingency contracting procedures were integrated within a behavioral consultation model used by a school psychologist consulting with a classroom teacher to modify personal hygiene of 12-year-old male. (Author/ABL)

  14. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  15. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  16. Instrument to measure psychological contract violation in pharmacy students.

    Science.gov (United States)

    Spies, Alan R; Wilkin, Noel E; Bentley, John P; Bouldin, Alicia S; Wilson, Marvin C; Holmes, Erin R

    2010-08-10

    To adapt and evaluate an instrument that measures perceived psychological contract violations in pharmacy students by schools and colleges of pharmacy. A psychological contract violations measure was developed from existing literature and the 1997 ACPE Guidelines and pilot-tested with second-year pharmacy students at 2 schools of pharmacy. A revised measure then was administered to second-year pharmacy students at 6 schools of pharmacy. Using a 5-point Likert-type scale, participants were asked to indicate the level of obligations they received compared to what was promised by the school of pharmacy. Exploratory factor analysis on the psychological contract violations measure was conducted using principal components analysis resulting in 7 factors, which led to a revised measure with 26 items. Using a sample of 339 students, the proposed 7-factor measurement model was tested using confirmatory factor analysis. In general, the results supported the hypothesized model. The final 23-item scale demonstrated both reliability and validity. Some students perceived certain aspects of the psychological contract that exists with their school of pharmacy were being violated. The psychological contract violations measure may serve as a valuable tool in helping to identify areas where their students believe that schools/colleges of pharmacy have not fulfilled promised obligations.

  17. Pedagogical contract: social imaginary in democratic evaluative practice

    Directory of Open Access Journals (Sweden)

    Nellys Marisol Castillo

    2017-08-01

    Full Text Available This research focused on generating reflection processes that should lead to a collective construction of a peda­gogical contract as a participative tool for the assessment practice in our institute. Participant co-researchers are: eighteen Departmental Representatives at the Assessment Unit, Assessment Unit Chairwoman, Students Support Manager, and Curriculum Manager. The participative action research led the approach of the present investigation. Five discussion and co-construction meetings were carried out where assessment criteria were discussed, also the appropriation of theoretical and legal epistemic referents that frame negotiation and partici­pation in the design and implementation of the pedagogical contract at UPEL-IPB were reviewed. As data collec­tion methods, pear observation and discussion teams were used, and as methodological resources, field diaries and audiovisual registers were implemented. Findings are organized in three different aspects: I. Assessment focus, uncertainty and fascination; II. Construction lead way, voice polyphony; III. Pedagogical contract, shared construction. These aspects are framed under the emergence of several categories generally related to models, conceptions, instruction, consequences and assessment performance. A proposal of pedagogical contract was agreed on -including its main elements and its respective implementation policies-. We hope to contribute to the consolidation of a more objective assessment approach -focused on reflective, consensus and negotiation processes- which should guarantee our teachers and students’ participation.

  18. Technical note: Analysis of claims and disputes in contracts for oil and gas development projects in Iran with solutions

    Directory of Open Access Journals (Sweden)

    Fathollah Sajedi

    2017-08-01

    Full Text Available Contracts for oil and gas development projects are naturally complex, they are explained with some of maps and technical specifications. To supply the goals of contracts, it is necessary to construct by a team having owner, consulting engineer and contractor. The unique aspects of each project and team working are resulting to disagreements. It should be noted that the majority of team workers have not previously worked together. It may not be expected to forecast all project aspects in design and preparation of tender documents process. However, in some cases it will occur inconsistencies in contract documents and possibly may be disagreements on commentary of the cases which there are in the provisions of the contract. Every root of disagreement resulted in to claim and finally dispute. Lack of foresight and/or existing ambiguous texts in some provisions of contract, not being aware of components of the project to conditions and obligations and rules of contract will complex and sometimes impossible the agreement on implementation problems. Therefore, the claims will be resulted in disputes and inflict financial losses to contractors and/or owners and then the projects will not be completed. In Iran many activities have not been carried out about claims and disputes in different orientations especially in areas futures and hence, it was studied in this research. Firstly, research history was considered and the causes of claims and disputes were identified in process of different levels of oil projects construction from primary to exploitation and then a questionnaire was prepared using the comments of experts. Finally, the questionnaire was analysed by SPSS and the approved factors in creation of claims and disputes and in their roots were ranked.

  19. Greening Public Buildings: ESCO-Contracting in Danish Municipalities

    Directory of Open Access Journals (Sweden)

    Jesper Rohr Hansen

    2013-05-01

    Full Text Available This paper presents current research on Danish municipalities’ use of Energy Service Companies (ESCO as a way to improve the standard of public buildings and to increase energy efficiency. In recent years more and more municipalities have used ESCO-contracts to retrofit existing public buildings, and to make them more energy efficient. At the moment 30 municipalities (of the 98 municipalities in Denmark are involved in, or preparing, ESCO contracts. Nevertheless, ESCO-contracting still faces many challenges on the Danish market, as there is a widespread skepticism towards the concept amongst many stakeholders. The purpose of this paper is to discuss the various experience gained so far by municipalities use of ESCO-contracting, the different approached to ESCO-contracting being used in practice, as well as the different viewpoints drivers and barriers behind the development. The strong growth in ESCO-contracts reflects that the ESCO-concept fits well with a number of present problems that municipalities are facing, as well as a flexible adaptation to the local context in different municipalities.

  20. A new research reactor? Report by the Select Committee for an inquiry into the contract for a new reactor at Lucas Heights

    International Nuclear Information System (INIS)

    2001-05-01

    On 15 August 2000, the Senate resolved to establish the Select Committee for an Inquiry into the Contract for a New Reactor at Lucas Heights and report to the Parliament. The Select committee majority report is divided into three parts: the need for a new reactor; the tendering process and the nature of the contract; and Australia's nuclear waste management strategy and public health and safety. There is a final chapter which brings together the major issues examined in the report. Based on the evidence presented to it, the Committee notes that some Australian scientists and engineers present a strong case for the new reactor. While the Committee is of the view that nuclear science and technology is not backward looking and does offer opportunities for researchers to keep at the forefront of important areas in scientific research and development it does not automatically follow that the best way to promote scientific and medical research in this country is by spending substantial amounts of public funds for the next forty years on a single research reactor. Nevertheless, the Committee recommends that before the Government proceeds any further with the proposed reactor, it undertake a thorough and comprehensive public review of funding for medical and scientific research in Australia with a view to assessing priorities including the role, if any, a research reactor would have in contributing to Australia's scientific, medical and industrial interests. The Committee also requested that the Australian National Audit Office consider examining the tender and contract documents for the new reactor at Lucas Heights with a view to determining: whether further investigation of the tendering process and the contract is warranted; whether, during the tendering process, ANSTO ensured that there was adequate and appropriate independent verification and validation of the tenderers claims. Two supplementary report are included: one from the Liberal and National members (minority

  1. Contract Design: Risk Management and Evaluation

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial dependence of the agent’s returns on the provider’s gain level. Integrated care systems as well as accountable care organisations (ACOs in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced.  Methods: Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting.  Results: Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods

  2. Preferred supplier contracts in post-patent prescription drug markets.

    Science.gov (United States)

    Blankart, Carl Rudolf; Stargardt, Tom

    2016-02-22

    In recent years, the expiration of patents for large drug classes has increased the importance of post-patent drug markets. However, previous research has focused solely on patent drug markets. In this study, the authors evaluate the influence of preferred supplier contracts, the German approach to tendering, in post-patent drug markets using a hierarchical market share attraction model. The authors find that preferred supplier contracts are a powerful strategic instrument for generic manufacturers in a highly competitive environment. They quantify the effects of signing a preferred supplier contract and show that brand-name manufacturers are vulnerable to tendering. Therefore, brand-name manufacturers should readjust their strategies and consider including preferred supplier contracts in their marketing mix. In addition, the authors employ a simulation to demonstrate that a first-mover advantage might be gained from signing a preferred supplier contract. Furthermore, their results can be used as a blueprint for decision makers in the pharmaceutical industry to assess the market share effects of different contracting strategies regarding preferred supplier contracts.

  3. Generic component reliability data for research reactors PSA. Final report of the CRP on data acquisition for research reactor PSA. Working material

    International Nuclear Information System (INIS)

    1993-01-01

    The scope of this document is to provide the final reference generic component reliability database information for a variety of research reactor types. As noted in Section 2.1 and Table 3a, many years of component data are represented in the database so that it is expected that the report should provide representative data valid for a number of years. The database provides component failure rates on a time and/or a demand related basis according to the operational modes of the components. At the current time an update of the database is not planned. As a result of the implementation of data collection systems in the research reactors represented in these studies, updating of data from individual facilities could be made available from the contributing research reactor facilities themselves. As noted in Section 1.2, the report does not include detailed discussion of information regarding component classification and reliability parameter definitions. The report does provide some insights and discussion regarding the practicalities of the data collection process and some guidelines for database usage. 9 refs, tabs

  4. Generic component reliability data for research reactors PSA. Final report of the CRP on data acquisition for research reactor PSA. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The scope of this document is to provide the final reference generic component reliability database information for a variety of research reactor types. As noted in Section 2.1 and Table 3a, many years of component data are represented in the database so that it is expected that the report should provide representative data valid for a number of years. The database provides component failure rates on a time and/or a demand related basis according to the operational modes of the components. At the current time an update of the database is not planned. As a result of the implementation of data collection systems in the research reactors represented in these studies, updating of data from individual facilities could be made available from the contributing research reactor facilities themselves. As noted in Section 1.2, the report does not include detailed discussion of information regarding component classification and reliability parameter definitions. The report does provide some insights and discussion regarding the practicalities of the data collection process and some guidelines for database usage. 9 refs, tabs.

  5. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  6. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  7. Research on Evaluation Methodology for High Temperature Components and Technical Issues

    International Nuclear Information System (INIS)

    Kim, Y.J.; Han, S.B.

    2007-03-01

    The research on evaluation methodology for high temperature components and technical issues includes the comparison of evaluation technology of Very High Temperature Reactors(VHTRs) with that of present commercial reactors, the review of Hot Gas Duct(HGD) insulation designs, the analysis of the codes related to VHTR component construction and the analysis of technical issues on application of present codes to HGD construction. Codes to assure the integrity of the VHTR components are not fully prepared yet in any country. To understand the evaluation technology of the VHTR-related codes, key requirements of ASME B and PV Code Section III, Subsection NB and NH were compared. Six kinds of HGD designs were reviewed and compared. A reference which analyzed seven kinds of present component codes were reviewed and the limitations of them were summarized. Especially it was found that the selection of materials is limited, material property data are not enough, and design analysis methodology is not fully specified

  8. Compilation of contract research for the Materials Engineering Branch, Division of Engineering

    International Nuclear Information System (INIS)

    1991-03-01

    This compilation of annual reports for FY 1990 by contractors to the Materials Engineering Branch of the Nuclear Regulatory Commission Office of Research concentrates on achievements in safety research for the primary system of commercial light water power reactors, particularly with regard to reactor vessels, primary system piping, steam generators, and nondestructive examination of primary system components. Separate abstracts have been prepared for each of the reports which are divided into the following categories: (1) vessel and piping fracture mechanics (including irradiation embrittlement); (2) pressure vessel surveillance dosimetry; (3) steam generators, aging, and environmental cracking; and (4) nondestructive examination techniques

  9. Contract and Game Theory: Basic Concepts for Settings with Finite Horizons

    Directory of Open Access Journals (Sweden)

    Joel Watson

    2013-08-01

    Full Text Available This paper examines a general model of contract in multi-period settings with both external and self-enforcement. In the model, players alternately engage in contract negotiation and take individual actions. A notion of contractual equilibrium, which combines a bargaining solution and individual incentive constraints, is proposed and analyzed. The modeling framework helps identify the relation between the manner in which players negotiate and the outcome of the long-term contractual relationship. In particular, the model shows the importance of accounting for the self-enforced component of contract in the negotiation process. Examples and guidance for applications are provided, along with existence results and a result on a monotone relation between “activeness of contracting” and contractual equilibrium values.

  10. A comparative analysis of quality management standards for contract research organisations in clinical trials.

    Science.gov (United States)

    Murray, Elizabeth; McAdam, Rodney

    2007-01-01

    This article compares and contrasts the main quality standards in the highly regulated pharmaceutical industry with specific focus on Good Clinical Practice (GCP), the standard for designing, conducting, recording and reporting clinical trials involving human participants. Comparison is made to ISO quality standards, which can be applied to all industries and types of organisation. The study is then narrowed to that of contract research organisations (CROs) involved in the conduct of clinical trials. The paper concludes that the ISO 9000 series of quality standards can act as a company-wide framework for quality management within such organisations by helping to direct quality efforts on a long-term basis without any loss of compliance. This study is valuable because comparative analysis in this domain is uncommon.

  11. Psychological contract types as moderator in the breach-violation and violation-burnout relationships.

    Science.gov (United States)

    Jamil, Amber; Raja, Usman; Darr, Wendy

    2013-01-01

    This research examined the relationships between perceived psychological contract breach, felt violation, and burnout in a sample (n = 361) of employees from various organizations in Pakistan. The moderating role of contract types in these relationships was also tested. Findings supported a positive association between perceived psychological contract breach and felt violation and both were positively related to burnout. Transactional and relational contracts moderated the felt violation-burnout relationship. Scores on relational contract type tended to be higher than for transactional contract type showing some contextual influence.

  12. Influence of Research Components and Knowledge on GDP Growth in the European Union Regions

    Directory of Open Access Journals (Sweden)

    Branimir Skoko

    2013-07-01

    Full Text Available It is often much more complex to explore economic growth at a regional level than at a national level due to regional differences, specialization and concentration of certain activities. Therefore, specific economic policy measures and instruments applied in one region will not produce the same effects in another region or at a national level. Consequently, research components and knowledge have become widely accepted indicators of efforts invested in technological advancement that enables higher economic growth rate and creates overall social well-being. In view of that, this paper aims to look into the interdependence between research components and knowledge on the one hand and economic growth rates at the regional level in the European Union on the other. Because of statistical determination, the research has been carried out in the second-level EU regions. Since the data were not coordinated with other research components in terms of time and geography, it was not possible to break down financial support by regional, national and supra-national affiliation.

  13. Multi-scale analysis of deformation behavior at SCC crack tip (2). (Contract research)

    International Nuclear Information System (INIS)

    Kaji, Yoshiyuki; Miwa, Yukio; Tsukada, Takashi; Hayakawa, Masao; Nagashima, Nobuo

    2007-03-01

    This report describes a result of the research conducted by the Japan Atomic Energy Agency and the National Institute for Materials Science under contract with Japan Nuclear Energy Safety Organization (JNES) that was concerned with a multi-scale analysis of plastic deformation behavior at the crack tip of stress corrosion cracking (SCC). The research was carried out to evaluate the validity of the SCC growth data acquired in the intergranular SCC (IGSCC) project based on a mechanistic understanding of SCC. For the purpose, in this research, analyses of the plastic deformation behavior and microstructure around the crack tip were performed in a nano-order scale. The hardness measured in nano, meso and macro scales was employed as a common index of the strength, and the essential data necessary to understand the SCC propagation behavior were acquired and analyzed that are mainly a size of plastic deformation region and a microstructural information in the region, e.g. data of crystallografy, microscopic deformation and dislocations at the inside of grains and grain boundaries. In this year, we analyzed the state of plastic deformation region at the crack tip of IGSCC under various conditions and investigated relationship between crack growth behavior and stress intensity factor. Especially, we investigated in detail about two different hardened specimens used in the SCC growth tests in the IGSCC project. (J.P.N.)

  14. Collaboration in Action: Measuring and Improving Contracting Performance in the University of California Contracting Network

    Science.gov (United States)

    Tran, Tam; Bowman-Carpio, LeeAnna; Buscher, Nate; Davidson, Pamela; Ford, Jennifer J.; Jenkins, Erick; Kalay, Hillary Noll; Nakazono, Terry; Orescan, Helene; Sak, Rachael; Shin, Irene

    2017-01-01

    In 2013, the University of California, Biomedical Research, Acceleration, Integration, and Development (UC BRAID) convened a regional network of contracting directors from the five University of California (UC) health campuses to: (i) increase collaboration, (ii) operationalize and measure common metrics as a basis for performance improvement…

  15. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  16. Is contracting out of public services still the great panacea?

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; hjelmar, ulf; Vrangbæk, Karsten

    2018-01-01

    This article presents the results of a systematic review of international studies on economic and quality effects of contracting out published in the period from 2000 to 2014. We conducted a comprehensive search of the literature and identified 49 relevant studies. There are three main findings...... of the systematic review: (1) cost savings documented in international contracting out literature have been decreasing over time; (2) cost savings have been much greater in technical services than in social services; and (3) economic effects have been twice as large in Anglo-Saxon countries compared with other...... countries. With regard to measuring the effect of contracting out on service quality, which is a vital component of any service delivery arrangement, very few studies assess this issue in a comprehensive manner. There is also a significant lack of studies that include measures of transaction costs, thereby...

  17. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  18. EPRI research on component aging and nuclear plant life extension

    International Nuclear Information System (INIS)

    Sliter, G.E.; Carey, J.J.

    1985-01-01

    This paper first describes several research efforts sponsored by the Electric Power Research Institute (EPRI) that examine the aging degradation of organic materials and the nuclear plant equipment in which they appear. This research includes a compendium of material properties characterizing the effects of thermal and radiation aging, shake table testing to evaluate the effects of aging on the seismic performance of electrical components, and a review of condition monitoring techniques applicable to electrical equipment. Also described is a long-term investigation of natural versus artificial aging using reactor buildings as test beds. The paper then describes how the equipment aging research fits into a broad-scoped EPRI program on nuclear plant life extension. The objective of this program is to provide required information, technology, and guidelines to enable utilities to significantly extend operating life beyond the current 40-year licensed term

  19. Mutuality and reciprocity in the psychological contracts of employees and employers.

    Science.gov (United States)

    Dabos, Guillermo E; Rousseau, Denise M

    2004-02-01

    The authors assessed the joint perceptions of the employee and his or her employer to examine mutuality and reciprocity in the employment relationship. Paired psychological contract reports were obtained from 80 employee-employer dyads in 16 university-based research centers. On the basis of in-depth study of the research setting, research directors were identified as primary agents for the university (employer) in shaping the terms of employment of staff scientists (employees). By assessing the extent of consistency between employee and employer beliefs regarding their exchange agreement, the present study mapped the variation and consequences of mutuality and reciprocity in psychological contracts. Results indicate that both mutuality and reciprocity are positively related to archival indicators of research productivity and career advancement, in addition to self-reported measures of Met Expectations and intention to continue working with the employer. Implications for psychological contract theory are presented. ((c) 2004 APA, all rights reserved)

  20. Physical Research Program: research contracts and statistical summary

    International Nuclear Information System (INIS)

    1975-01-01

    The physical research program consists of fundamental theoretical and experimental investigations designed to support the objectives of ERDA. The program is directed toward discovery of natural laws and new knowledge, and to improved understanding of the physical sciences as related to the development, use, and control of energy. The ultimate goal is to develop a scientific underlay for the overall ERDA effort and the fundamental principles of natural phenomena so that these phenomena may be understood and new principles, formulated. The physical research program is organized into four functional subprograms, high-energy physics, nuclear sciences, materials sciences, and molecular sciences. Approximately four-fifths of the total physical research program costs are associated with research conducted in ERDA-owned, contractor-operated federally funded research and development centers. A little less than one-fifth of the costs are associated with the support of research conducted in other laboratories

  1. Army Contract Specialists’ Lack of Desire to Become Contracting Officers

    Science.gov (United States)

    2012-05-01

    response to question 2 was 1 or 2, choose all the responses that support the reasoning for your answer. B ). N o t en o u g h w el l tr ai n ed...contracting specialist set the goal of becoming a contracting officer? ACC 20 Contracting officer burnout Consider contracting officer rotations every 2 to

  2. Tales of IT Consultants: Understanding Psychological Contract Maintenance and Employment Termination

    Directory of Open Access Journals (Sweden)

    Karlheinz Kautz

    2015-09-01

    Full Text Available This research investigates the question why dedicated Information Technology (IT consultants quit their jobs and voluntarily terminate their employment contracts. A research approach inspired by grounded theory is used and as a theoretical contribution a novel, cyclic process model for the maintenance or neglect of the psychological contract between employees and employers is derived from the empirical data. The model is subsequently substantiated through the integration of various concepts and theories identified in the literature, combining the concept of psychological contract with social influence theory and a theory of the relation between intrinsic motivation and management practices. The research is based on a revelatory case study which provides tales from four IT consultants in an IT consulting firm. The model helps to explain IT consultants’ behaviour of voluntarily terminating their employment contracts. Additionally, it should assist managers in IT consulting firms to avoid practices which might lead to their employees’ loss of intrinsic motivation and result in the loss of valuable employees for the organization.

  3. A Liquid work-life under public service contracting

    DEFF Research Database (Denmark)

    Lindholst, Christian

    for staff, however, are only poorly understood in current theory and research on public service contracting through partial concepts and a tendency to focus merely on negative outcomes. Against this shortfall, the aim in this paper is to build a conceptually and empirically richer and more authentic account......A part of the reality behind public service contracting in Denmark as well as in many other countries is that a growing number of people are employed in uncertain and temporary conditions and relations in what can be characterized as ‘liquidized’ work-lives. This reality and its consequences...... of staffs’ work-life under public service contracting. The paper relies empirically on focus group interviews in two cases of staff transfers in public service contracting with different levels of liquefaction. it is found that staff transfer is a composite experience for staff with differential outcomes...

  4. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  5. The State-ANDRA contract of objectives for 2013-2016

    International Nuclear Information System (INIS)

    Fioraso, Genevieve; Moscovici, Pierre; Gonnot, Francois-Michel; Dupuis, Marie-Claude

    2013-05-01

    After a brief presentation of the ANDRA and of its missions, this document discusses the context and strategic orientations: results of the 2009-2012 contract, new elements of context, new priorities for public authorities, and strategic orientations. The next part presents the objectives of the new contract. It describes the various roles the ANDRA is to play: a designer and lead contractor possessing a high level research capacity, an exemplary industrialist, a public expert guarantor of the comprehensiveness of solutions for the management of radioactive wastes, a centre of information and dissemination in France and at the international level, and support and management. Appendices propose a table of activities and sponsors, the main milestones of the contract, a contract follow-up indicator

  6. Nuclear Plant Aging Research (NPAR) program plan: Components, systems, and structures

    International Nuclear Information System (INIS)

    1987-09-01

    The nuclear plant aging research described in this plan is intended to resolve issues related to the aging and service wear of equipment and systems and major components at commercial reactor facilities and their possible impact on plant safety. Emphasis has been placed on identification and characterization of the mechanisms of material and component degradation during service and evaluation of methods of inspection, surveillance, condition monitoring, and maintenance as means of mitigating such effects. Specifically, the goals of the program are as follows: (1) to identify and characterize aging and service wear effects which, if unchecked, could cause degradation of equipment, a systems, and major components and thereby impair plant safety; (2) to identify methods of inspection, surveillance, and monitoring, or of evaluating residual life of equipment, systems, and major components, which will ensure timely detection of significant aging effects prior to loss of safety function; and (3) to evaluate the effectiveness of storage, maintenance, repair, and replacement practices in mitigating the rate and extent of degradation caused by aging and service wear

  7. Buy-back and Revenue-Sharing Contracts in Global Supply Chain

    Directory of Open Access Journals (Sweden)

    Yang Liu

    2015-09-01

    Full Text Available Purpose: The main propose of this study is to investigate how exchange rate risk affects the buy-back and revenue-sharing contracts in the global supply chain, hence to improve the performance of global supply chain. Design/methodology/approach: Based on a two-echelon global supply chain, with the model equilibrium, this paper studies the difference between the buy-back contract and the revenue-sharing contract. By the transmitting of the exchange rate risk, it discusses the node-enterprises’ optimal strategies. Findings: The result shows that: (1 Both these two contracts can diminish the inefficiency caused by demand risk, but none of them can manage the exchange rate risk. (2 No matter which currency is used to settle the payment, both these two contracts will lead to the transmitting of exchange rate risk from one node-enterprise to another. (3 When the currency of the supplier’s country in the relatively appreciating, it is better to use the buy-back contract; when the currency of the supplier’s country in the relatively depreciating, the revenue-sharing contract will lead to a better result. Research limitations/implications: Though this study analyzes how the exchange rate risk affects these two contracts, it based on the assumption that node-enterprises’ goal is maximizing theirs expected profit. In fact, many firms not only focus on maximizing theirs expected profit; the risk-taking is also an important concern. For future researches, how firms’ risk-preferences affects theirs decisions in the global supply chain will be an interesting question. Also, will there be any difference if consider the node-enterprises’ utility functions instead of the expected profit. Originality/value: Existing literature about the global supply chain mainly focus on the exchange rate risk management, few of them considers the double marginalization effect caused by the demand risk. Therefore, with the exchange rate fluctuation, we discuss the

  8. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  9. HARMONIZATION OF THE CONSUMER CONTRACT DISPOSITIONS WITH THE GENERAL CONTRACT RULES

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2016-05-01

    Full Text Available This work contains and mainly tackles the contract of consumption, its differences and similitudes to a general contract, manners of applying it, and the way in which the former can be better coordinated and correlated to the general contracting terms, established by the civil law. Along the years, the consumption contract has undergone several addenda and it has come to represent an instrument of both refference and regulation for the socio-economical relations between two parties who have a commercial agreement. The general law frame has had a great influence in the development of the consumption contract, as well as on its applicability conditions and its manner of deployment. Through the development of the judicial law concerning the contract of concumption, this type of agreement has influenced, through its human and social nature, both the general contract, and the specific frame it relates to. The relationship between the two types of contract is one of interdependence, which is determined by the need of judicial regulation in the Romanian and European economy. The ceaselees development of interhuman relations pushes society towards maintaining a continuous study of the advancement of specific legislation and judicial regulation. The main purpose of this work is analyzing the general judicial frame and the way in which the differences between the general contract and the consumption one may represent a benefic and mutual influence on protecting the citizens’ rights, which in the case of the consumption contract encompasses the protection of consumers’ rights. Also, it will analyze the aspects that determine the manner of application and the the differences that can be surmounted in order to achieve a better cohesion between these types of contracts.

  10. Modulation of contraction by intracellular Na+ via Na(+)-Ca2+ exchange in single shark (Squalus acanthias) ventricular myocytes.

    Science.gov (United States)

    Näbauer, M; Morad, M

    1992-01-01

    1. The effect of direct alteration of intracellular Na+ concentration on contractile properties of whole-cell clamped shark ventricular myocytes was studied using an array of 256 photodiodes to monitor the length of the isolated myocytes. 2. In myocytes dialysed with Na(+)-free solution, the voltage dependence of Ca2+ current (ICa) and contraction were similar and bell shaped. Contractions activated at all voltages were completely suppressed by nifedipine (5 microM), and failed to show significant tonic components, suggesting dependence of the contraction on Ca2+ influx through the L-type Ca2+ channel. 3. In myocytes dialysed with 60 mM Na+, a ICa-dependent and a ICa-independent component of contraction could be identified. The Ca2+ current-dependent component was prominent in voltages between -30 to +10 mV. The ICa-independent contractions were maintained for the duration of depolarization, increased with increasing depolarization between +10 to +100 mV, and were insensitive to nifedipine. 4. In such myocytes, repolarization produced slowly decaying inward tail currents closely related to the time course of relaxation and the degree of shortening prior to repolarization. 5. With 60 mM Na+ in the pipette solution, positive clamp potentials activated decaying outward currents which correlated to the size of contraction. These outward currents appeared to be generated by the Na(+)-Ca(2+)-exchanger since they depended on the presence of intracellular Na+, and were neither suppressed by nifedipine nor by K+ channel blockers. 6. The results suggest that in shark (Squalus acanthias) ventricular myocytes, which lack functionally relevant Ca2+ release pools, both Ca2+ channel and the Na(+)-Ca2+ exchanger deliver sufficient Ca2+ to activate contraction, though the effectiveness of the latter mechanism was highly dependent on the [Na+]i. PMID:1338467

  11. Free-piston Stirling component test power converter test results and potential Stirling applications

    Science.gov (United States)

    Dochat, G. R.

    1992-01-01

    As the principal contractor to NASA-Lewis Research Center, Mechanical Technology Incorporated is under contract to develop free-piston Stirling power converters in the context of the competitive multiyear Space Stirling Technology Program. The first generation Stirling power converter, the component test power converter (CTPC) initiated cold end testing in 1991, with hot testing scheduled for summer of 1992. This paper reviews the test progress of the CTPC and discusses the potential of Stirling technology for various potential missions at given point designs of 250 watts, 2500 watts, and 25,000 watts.

  12. Contractual Alliance Governance: Impact of Different Contract Functions on Alliance Performance

    NARCIS (Netherlands)

    Faems, D.L.M.; Alberink, Rutger; Groen, Arend J.; Klein Woolthuis, Rosalinde

    2010-01-01

    Recent research on alliance governance has emphasized that contracts can have both a control and coordination function. In this paper, we test the impact of these different contract functions on alliance performance. Conducting structural equation analyses on a sample of 270 Dutch technology

  13. The effects of psychological contract violation on employees' commitment to organizational change

    OpenAIRE

    Ran, Yuhong

    2007-01-01

    This research examines the relationship between the perceived psychological contract violation and employee’s commitment to organizational change in business merger situation. Through the research, it shows that perceived psychological contract violation will significantly reduce the employees’ affective commitment to organizational change; increase continuance commitment to organizational change, but will not significantly affect the normative commitment to organizational change. Also, the e...

  14. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Science.gov (United States)

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  15. Long-term contracts and take-or-pay clauses in natural gas markets

    International Nuclear Information System (INIS)

    Creti, A.; Villeneuve, B.

    2004-01-01

    Theoretical and empirical research on long-term contracts inspired by the American experience are surveyed, with emphasis on the analysis of the role of take-or-pay clauses and price indexation rules, and whether regulation distorts optimal contract duration. The underlying motivation is to analyze the economic fundamentals of the European Union provisions on long-term contracts in the natural gas industry, and to highlight the features that differentiate them from the American experience. The impacts of long term contracts in the opening to competition of the European Union natural gas sector, and the apparent confusion between contract duration and flexibility as applied to long-term contracts in the European Union, are also explored. 29 refs., 2 tabs

  16. Can Markers Detect Contract Cheating? Results from a Pilot Study

    Science.gov (United States)

    Dawson, Phillip; Sutherland-Smith, Wendy

    2018-01-01

    Contract cheating is the purchasing of custom-made university assignments with the intention of submitting them. Websites providing contract cheating services often claim this form of cheating is undetectable, and no published research has examined this claim. This paper documents a pilot study where markers were paid to mark a mixture of real…

  17. Extended warranties, maintenance service and lease contracts modeling and analysis for decision-making

    CERN Document Server

    Murthy, D N Prabhakar

    2014-01-01

    Serving to unify the existing literature on extended warranties, maintenance service contracts and lease contracts, this book also presents a unique perspective on the topic focussed on cost analysis and decision-making from the perspectives of the parties involved. Using a game theoretic approach together with mathematical modelling, results are presented in an integrated manner with key topics that require further research highlighted in order to serve as a starting point for researchers (engineers and statisticians) who are interested in doing further work in these areas. Designed to assist practitioners (managers, engineers, applied statisticians) who are involved with extended warranties, maintenance service contracts and lease contracts, the book provides them with the models and techniques needed for proper cost analysis and effective decision-making. The book is also suitable for use as a reference text in industrial engineering, applied statistics, operations research and management.

  18. Using performance-based contracts to foster innovation in outsourced service delivery

    NARCIS (Netherlands)

    Sumo, Regien; van der Valk, Wendy; Duijsters, Geert; van Weele, Arjan

    2016-01-01

    While many scholars claim that Performance-based Contracts (PBCs) foster supplier-led innovation, empirical research into their actual use and effects remains limited. We therefore explore two cases of IT outsourcing through such contracts to see whether, and if so how, PBCs foster innovation. Our

  19. The effect of human resource practices on psychological contracts at an iron ore mining company in South Africa

    Directory of Open Access Journals (Sweden)

    Caren B. Scheepers

    2011-08-01

    Full Text Available Orientation: Human resource practices influence the psychological contract between employee and employer and, ultimately, organisational performance. Research purpose: The objective of this study was to examine the effect of human resource practices on the types of psychological contracts in an iron ore mining company in South Africa empirically. Motivation for the study: Although there have been a number of conceptual studies on the effect of human resource practices on psychological contracts, there has been no effort to synthesise the links between these contracts and various human resource practices systematically. This study endeavoured to provide quantitative evidence to verify or refute conceptual studies on this relationship. Its findings could inform human resource strategies and, ultimately, the prioritisation of human resource practices to improve the cost-effective allocation of resources. Research design, approach and method: The researchers administered two questionnaires. These were Rousseau’s Psychological Contract Inventory (2000 and the Human Resource Practices Scale of Geringer, Colette and Milliman (2002. The researchers conducted the study with 936 knowledge workers at an iron ore mining company in South Africa. They achieved a 32% response rate. Main findings: The findings showed that most participants have relational contracts with the organisation. Another 22% have balanced contracts, 8% have transitional contracts whilst only 1% have transactional contracts. The study suggests that there are relationships between these psychological contracts and specific human resource practices. The study found that training and development was the most important human resource practice for developing relational and balanced contracts. Employees thought that they contributed more than their employer did to the relationship. The researchers developed a model to illustrate the influence of the various human resource practices on

  20. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  1. Prevalence of metabolic components in university students

    OpenAIRE

    Silva, Ana Roberta Vilarouca da; Sousa, Luana Savana Nascimento de; Rocha, Telma de Sousa; Cortez, Ramiro Marx Alves; Macêdo, Layla Gonçalves do Nascimento; Almeida, Paulo César de

    2014-01-01

    OBJECTIVE: to identify the frequency of components of Metabolic Syndrome (MetS) among university students.METHOD: descriptive study with 550 students, from various courses run by a public university. The socioeconomic data, lifestyle, and components of MetS were filled out using a questionnaire. Blood sample collection was undertaken in the university itself by a contracted clinical analysis laboratory.RESULTS: 66.2% were female, with a mean age of 22.6±4.41; 71.7% were sedentary; 1.8% stated...

  2. Innovative contracting strategies for combating climate change.

    Science.gov (United States)

    2011-11-01

    The state of Maryland has made a strong commitment to combating climate change and reducing : greenhouse gas emissions. This research investigated the state of practice of innovative contracting : solutions to reduce emissions from highway constructi...

  3. PROPOSAL OF THE SOCIAL CONTRACT IN MANAGEMENT AS INSTRUMENT OF ANALYSIS FOR THE EMPLOYMENT RELATION. THE EXPERIENCE OF AUTOMOTIVE INDUSTRY IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Muresanu Doina

    2012-07-01

    through the systematic and global vision of the values and standards relating to the employment relation, that we can better comprehend the consequences of a change of the employment relation. Given its exploratory character, we use an inductive, thus qualitative, methodology, to perform this research. The partial results of the analysis of the interviews led in two Romanian companies during the summer of 2010 allowed us to identify several components, which we called "terms" of the social contract. These results will deliver to the practitioners and to the researchers in management a relevant tool to better understand the relation of employment in different national cultures as well as a measuring instrument for the quality of the employee-employer relation. Our communication ends by proposing various paths of reflection which will allow to use this approach in future researches concerning the employment relation.

  4. The Dynamic Character of a Psychological Contract between the Superior and the Employee (According to Empirical Research

    Directory of Open Access Journals (Sweden)

    Anna ROGOZIŃSKA-PAWEŁCZYK

    2015-12-01

    Full Text Available This article analyses the dynamic character of relationships between superiors and employees in the context of a psychological contract. One of the assumptions is that superiors and employees’ shared understanding of their mutual obligations and expectations underpins the performance of the psychological contract. The article explains the concept of a psychological contract and addresses possible breaches thereto as well as their impact on the shape of relationships between superiors and employees. Information necessary to carry out the analysis was obtained from surveys conducted with 178 representatives of large and medium-sized firms based in Poland and with 800 of their employees. In addition to determining the state and contents of a psychological contract as felt by superiors and employees, the article provides also a description and the rankings of their mutual expectations and obligations related to a psychological contract. The degree of similarity between the opinions of the surveyed superiors and employees on each other’s obligations and expectations was assessed with a specially constructed index (an opinion coincidence index, OCI. the results of the surveys and the direction and amount of OCI’s deviation from show that while employees and superiors frequently differ in the perceptions of their expectations and obligations, there are also areas where their opinions are identical. It has also been found that employees’ perception of the contents of a psychological contract depends on their age and the number of years they have worked in the organisation. This fact points to the dynamic character of a psychological contract.

  5. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  6. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  7. An analysis of vendor innovation capability in the contract electronics manufacturing industry

    DEFF Research Database (Denmark)

    Perunovic, Zoran; Mefford, Robert; Christoffersen, Mads

    2016-01-01

    the contract, vendors can use different configurations of the competitive priorities of cost, quality, delivery and flexibility. The research aggregates the capabilities that influence the innovative capability of a vendor into the innovation-related capabilities (IRCs) of design, new product introduction......Limited academic research has been given to analysing the innovation capabilities of vendors in outsourcing contracts. This paper seeks to address this gap in the literature by enhancing our understanding of how the innovation capability of vendors is deployed to win, run and renew outsourcing...... contracts with their customers. Employing the resource-based view as a theoretical basis and undertaking in-depth case study analysis of three vendors in the electronic manufacturing services industry, the research shows that to achieve the outsourcing objectives of winning, running and renewing...

  8. Jazzing up the Psychological Contract

    Science.gov (United States)

    Hartley, Nell Tabor

    2010-01-01

    Helping students and practitioners to understand and utilize the Psychological Contract is often a difficult task. Unlike fault-finding research, this paper presents the PC as a positive, vibrant and valuable tool. In an effort to make the concept less elusive, the paper draws upon the metaphor of jazz. The metaphor is an accepted tool of…

  9. The use of the psychological contract to explain turnover intentions in the hospitality industry : A research study on the impact of age categories and gender on turnover intentions of highly educated employees

    NARCIS (Netherlands)

    Blomme, R.J.; Tromp, D.M.; Rheede, van A.

    2010-01-01

    The subject of this study is the psychological contract approach to the employment relationship within the hospitality industry with special reference to highly educated employees. The purpose was to research the differences in the psychological contract and its relation to the intention to leave

  10. FFUSION yearbook 1996. Annual report of the Finnish research unit. Association EURATOM-TEKES

    Energy Technology Data Exchange (ETDEWEB)

    Karttunen, S; Paettikangas, T [eds.; VTT Energy, Espoo (Finland)

    1997-05-01

    Finnish fusion programme (FFUSION) is one of the eleven national energy research programmes funded by the Technological Development Centre of Finland (TEKES). The FFUSION programme was fully integrated into European Fusion Programme just after Finland joined the European Union. The contract of Association Euratom and Tekes was signed in 1995 and extends to the end of 1999. Finland became a member of JET Joint Undertaking in 1996, other contracts with Euratom include NET agreement and the Staff Mobility Agreement. FFUSION programme with participating research institutes and universities forms the Fusion Research Unit of the Association Euratom-Tekes. This annual report summarises the research activities of the Finnish Research Unit in 1996. The programme consists of two parts: Physics and Technology. The research areas of the physics are: Fusion plasma engineering, Radio-frequency heating and plasma diagnostics, and Plasma-wall interactions - ion-beam studies. The technology is focused into three areas: Fusion reactor materials (first wall components and joining techniques), Remote handling and viewing systems, and Superconductors

  11. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  12. Psychological contract and organizational citizenship behavior : A new deal for new generations?

    NARCIS (Netherlands)

    Lub, X.D.; Blomme, R.J.; Bal, P.M.

    2011-01-01

    This research aims to shed light on organizational citizenship behaviors (OCBs) of different generations of hospitality workers in relation to their psychological contract. The psychological contract, which describes employees' implicit expectations of their employer, is related to a range of

  13. Radiology equipment maintenance and contract procurement in the UK.

    Science.gov (United States)

    Wright, Christopher J

    2012-01-01

    Radiology equipment maintenance has a similar financial value to new device acquisition over the lifetime of the device. Comprehensive style contracts are dominant largely due to their ease of use and the potential to control budgetary costs, but costs are high. Creative procurement solutions can offer better value. The corrective portion of comprehensive contracts is estimated to be between 50% (Mobile C-Arm) to 92% (CT), which equates to $29.4 million; 80% of the total contract costs within the research population of this study. Many organizations could free up cash by better managing their maintenance costs, potentially creating funding opportunities for new equipment.

  14. Research on air and missile defense task allocation based on extended contract net protocol

    Science.gov (United States)

    Zhang, Yunzhi; Wang, Gang

    2017-10-01

    Based on the background of air and missile defense distributed element corporative engagement, the interception task allocation problem of multiple weapon units with multiple targets under network condition is analyzed. Firstly, a mathematical model of task allocation is established by combat task decomposition. Secondly, the initialization assignment based on auction contract and the adjustment allocation scheme based on swap contract were introduced to the task allocation. Finally, through the simulation calculation of typical situation, the model can be used to solve the task allocation problem in complex combat environment.

  15. Pier and contraction scour prediction in cohesive soils at selected bridges in Illinois

    Science.gov (United States)

    Straub, Timothy D.; Over, Thomas M.

    2010-01-01

    This report presents the results of testing the Scour Rate In Cohesive Soils-Erosion Function Apparatus (SRICOS-EFA) method for estimating scour depth of cohesive soils at 15 bridges in Illinois. The SRICOS-EFA method for complex pier and contraction scour in cohesive soils has two primary components. The first component includes the calculation of the maximum contraction and pier scour (Zmax). The second component is an integrated approach that considers a time factor, soil properties, and continued interaction between the contraction and pier scour (SRICOS runs). The SRICOS-EFA results were compared to scour prediction results for non-cohesive soils based on Hydraulic Engineering Circular No. 18 (HEC-18). On average, the HEC-18 method predicted higher scour depths than the SRICOS-EFA method. A reduction factor was determined for each HEC-18 result to make it match the maximum of three types of SRICOS run results. The unconfined compressive strength (Qu) for the soil was then matched with the reduction factor and the results were ranked in order of increasing Qu. Reduction factors were then grouped by Qu and applied to each bridge site and soil. These results, and comparison with the SRICOS Zmax calculation, show that less than half of the reduction-factor method values were the lowest estimate of scour; whereas, the Zmax method values were the lowest estimate for over half. A tiered approach to predicting pier and contraction scour was developed. There are four levels to this approach numbered in order of complexity, with the fourth level being a full SRICOS-EFA analysis. Levels 1 and 2 involve the reduction factors and Zmax calculation, and can be completed without EFA data. Level 3 requires some surrogate EFA data. Levels 3 and 4 require streamflow for input into SRICOS. Estimation techniques for both EFA surrogate data and streamflow data were developed.

  16. Coordination mechanism of SaaS service supply chain: Based on compensation contracts

    Directory of Open Access Journals (Sweden)

    Yanli Guo

    2013-09-01

    Full Text Available Purpose: The purpose of this paper is to build new contracts theories of SaaS service supply chain. Software as a Service (SaaS has become a hot topic in this industry . Compared with traditional manufacturing supply chain and general service supply chain, the new IT service supply chain which based on SaaS has characteristics of both service and IT. And SaaS is completely different from traditional software package model. Therefore the classic contracts, which be widely used in traditional manufacturing supply chain, can’t be directly applied in SaaS service supply chain. The necessary way of IT services developing is to study the SaaS service supply chain combining with characteristics of SaaS. Therefore, It focuses on the coordination of SaaS service supply chain. Design/methodology/approach: It tries to answer the following question: how do the ISV motivate SaaS operators to improve the service level through effective contracts mechanism under conditions of asymmetric information. In order to answer these questions, this paper does some researches including: Under the conditions of information asymmetry, supposing the service level (is related to the degree of effort of SaaS operator was private information, we construct model of compensation contract, i.e., to motivate SaaS operator to improve service level through transfer payments of compensation price. Findings and Originality/value: The study finds out that when ISV get to “positive feedback”, instead of the traditional market equilibrium, compensation contract (linear can coordinate satisfactorily the SaaS service supply chain. In the point of “positive feedback”, the marginal revenue equals the marginal cost, but it is not the equilibrium of ISV’profit-maximization. Research limitations/implications: There are some limitations in this research. In the linear compensation contracts, the compensation price is fixed value. If in the contract, we can create a change value

  17. A decision-making framework to integrate maintenance contract conditions with critical spares management

    International Nuclear Information System (INIS)

    Godoy, David R.; Pascual, Rodrigo; Knights, Peter

    2014-01-01

    Maintenance outsourcing is a strategic driver for asset intensive industries pursuing to enhance supply chain performance. Spare parts management plays a relevant role in this premise since its significant impact on equipment availability, and hence on business success. Designing critical spares policies might therefore seriously affect maintenance contracts profitability, yet service receivers and external providers traditionally attempt to benefit separately. To coordinate both chain parties, we investigated whether the spare components pool should be managed in-house or contracted out. This paper provides a decision-making framework to efficiently integrate contractual conditions with critical spares stockholding. Using an imperfect maintenance strategy over a finite horizon, the scheme maximizes chain returns whilst evaluating the impact of an additional part to stock. As result, an original joint value – preventive interval and stock level – sets the optimal agreement to profitably allocate the components pool within the service contract. Subsidization bonuses on preventive interventions and pooling costs are also estimated to induce the service provider to adjust its policy when needed. The proposed contractual conditions motivate stakeholders to continuously improve maintenance performance and supply practices, thus obtaining higher joint benefits

  18. The Relationship between the Employment Contract and other Civil Contracts

    Directory of Open Access Journals (Sweden)

    Răzvan Radu Popescu

    2015-05-01

    Full Text Available The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contract so different from other contracts. We think this article is an important step in the disclosure of the problem eraised by these two concepts.

  19. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  20. Free-piston Stirling component test power converter

    Science.gov (United States)

    Dochat, George; Dhar, Manmohan

    1991-01-01

    The National Aeronautics and Space Administration (NASA) has been evaluating free-piston Stirling power converters (FPSPCs) for use on a wide variety of space missions. They provide high reliability, long life, and efficient operation and can be coupled with all potential heat sources, various heat input and heat rejection systems, and various power management and distribution systems. FPSPCs can compete favorably with alternative power conversion systems over a range of hundreds of watts to megawatts. Mechanical Technology Incorporated (MTI) is developing FPSPC technology under contract to NASA Lewis Research Center and will demonstrate this technology in two full-scale power converters operating at space temperature conditions. The testing of the first of these, the component test power converter (CTPC), was initiated in Spring 1991 to evaluate mechanical operation at space operating temperatures. The CTPC design, hardware fabrication, and initial test results are reviewed.

  1. Analysis of Contract Source Selection Strategy

    Science.gov (United States)

    2015-07-07

    accomplish this milestone due to his unconditional love. I would like to thank my mom, Saraswati, and my dad , Khilendra, for their support and patience...FOR FURTHER RESEARCH The task of understanding the impact of a source selection strategy on resultant contract outcomes is a topic rich for further

  2. Contract Source Selection: An Analysis of Lowest Price Technically Acceptable and Tradeoff Strategies

    Science.gov (United States)

    2016-06-15

    using- spss - statistics.php Lamoureux, J., Murrow, M., & Walls, C. (2015). Relationship of source selection methods to contract outcomes: an analysis ...Contract Source Selection: an Analysis of Lowest Price Technically Acceptable and Tradeoff Strategies 15 June 2016 LCDR Jamal M. Osman, USN...ACQUISITION RESEARCH PROGRAM SPONSORED REPORT SERIES Contract Source Selection: an Analysis of Lowest Price Technically Acceptable and Tradeoff

  3. Psychological contract and organizational citizenship behavior in China: investigating generalizability and instrumentality.

    Science.gov (United States)

    Hui, Chun; Lee, Cynthia; Rousseau, Denise M

    2004-04-01

    This study examined the generalizability of psychological contract forms observed in the West (D. M. Rousseau, 2000) to China. Using 2 independent samples, results confirmed the generalizability of 3 psychological contract forms: transactional, relational, and balanced. This study also examined the nature of relationships of psychological contracts with organizational citizenship behavior (OCB). In particular, this study explored the role of instrumentality as a mediating psychological process. The authors found evidence that instrumentality mediates the relationship of relational and balanced forms with OCB; however, the transactional contract form is directly related to OCB. The authors discuss the implications of these results for the meaning of psychological contracts and OCB in China and raise issues for future research.

  4. Preparation of International Business Contracts in Facing the ASEAN Economic Community Era

    Directory of Open Access Journals (Sweden)

    Sahlan Sahlan

    2016-12-01

    Full Text Available This article reviews the preparation for composing and formulating the international business contracts in facing the ASEAN Economic Community era. The study used the normative approach by collecting the materials related to the international business contracts. The outcomes of the research indicate that constitutionally, the Indonesian government must provide protection and equitable legal certainty for Indonesian citizens who intend to conduct business transactions within the framework of AEC. Format and writing techniques of international business contracts is compulsory known by the business people and their legal consultants that they do not suffer losses due to errors in the preparing of contract that violates the rules and provisions of international business contract.

  5. Renegotiating ethane contracts from producer/processor perspectives

    International Nuclear Information System (INIS)

    Hawkins, D. J.

    1997-01-01

    An overview of commercial practices relating to ethane sup ply and other collateral issues, including the variety of technologies used in the recovery of ethane and the manufacture of ethylene was provided. Ethane supply and demand balances, the Alberta ethane supply, the justifications for ethane recovery, the need for renegotiating ethane contracts in view of the changing Alberta market, the major price components , producers and processors' objectives in ethane sales, the nature of ethane contracts, and ethane pricing mechanisms were reviewed. The 'Alberta Advantage' based on gas price, large-scale ethane recovery, proximity to the largest market in the world, efficient transportation and fractionation facilities, further enhanced by deregulation and reduced regulatory barriers, was described. It was suggested that the enhanced competition and increase in market diversity demands a transparency in pricing that may well be realized as additional players enter the petrochemical business, and as competing transportation, processing and fractionation options become available to ethane suppliers and purchasers.1 tab

  6. Report on results of contract research. 'Research on MHD generation system'; MHD hatsuden system no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    'Research on MHD generation system' was implemented by its expert committee in the electric joint study group, with the results of fiscal 1982 reported. This year is the final year of this research; therefore, reexamination was made from the practical standpoint on the R and D of coal fired MHD generation, evaluating the present technological level as well as clarifying the development procedures, with proposals made as to the R and D from now on. The present technological level in the practicability is still in the basic stage, where the essential problem is the development of combustors, air heaters and generation channels in particular. An examination was conducted for the problems, procedures and period of the development for each component equipment, with the results provided as materials for studying the path to the experimental plant of 100 MW heat input. In the method of proceeding with the R and D in the future, it was decided as essential, in order to enter the stage of the experimental plant from the element technology development, that R and D is carried out on the unestablished component technology, making sure that no excessive risk is taken in scaling up to the next stage. (NEDO)

  7. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  8. Contracts in Public Administration

    Directory of Open Access Journals (Sweden)

    Agnieszka GRZESIOK-HOROSZ

    2011-03-01

    Full Text Available Objectives: The present makes a contribution to the discussion on contracts in administration under Polish law. It concentrates on theoretical issues, but ones of considerable practical significance. Prior Work though relatively poorly explored, field. This paper is a result of academic considerations on the classical institution of civil law, namely a bilateral juridical act significance of this area may be demonstrated by the fact that one scientific conference and a collection of papers have been devoted to contracts in administration. as research method, the analysis of jurisprudence and doctrinal writings referring to law currently in force. The paper discusses as well the draft of the administrative law, and includes comparative remarks. put forward certain comments pertainin legislation. The authors formulate as well outline theses interesting but complicated matters. As a voice in the doctrinal dispute it can als useful for law students. Value composition. Starting from gener the binding law and proposed amendments. The functioning in foreign countries and proposals of regulatory solutions.

  9. Experiments on supply chain contracting: effects of contract type and fairness concerns

    OpenAIRE

    Arabacı, Özge; Arabaci, Ozge

    2013-01-01

    In this thesis, we conduct experiments with human decision makers on supply chain contracting. We consider a simple manufacturer-retailer supply chain scenario where the retailer faces the newsvendor problem. Building on Sahin and Kaya (2011), we compare the experimental performance of three contract types (wholesale price, buyback and revenue sharing contracts) between the firms with theoretical predictions, and among each other. We are interested in the manufacturer’s contract parameter dec...

  10. FFUSION yearbook 1997. Annual report of the Finnish fusion research unit. Association EURATOM-TEKES

    Energy Technology Data Exchange (ETDEWEB)

    Karttunen, S; Paettikangas, T [eds.; VTT Energy, Espoo (Finland)

    1998-02-01

    Finnish fusion programme (FFUSION) is one of the eleven national energy research programmes funded by the Technological Development Centre of Finland (TEKES). The FFUSION programme was fully integrated into European Fusion Programme just after Finland joined the European Union. The contract of Association Euratom and Tekes was signed in 1995 and extends to the end of 1999. Finland became a member of JET Joint Undertaking in 1996, other contracts with Euratom include NET agreement and the Staff Mobility Agreement. FFUSION programme with participating research institutes and universities forms the Fusion Research Unit of the Association Euratom-Tekes. This annual report summarises the research activities of the Finnish Research Unit in 1997. The programme consists of two parts: Physics and Technology. The research areas of the physics are: Fusion plasma engineering, and Radio-frequency heating and Plasma diagnostics. The technology is focused into three areas: Fusion reactor materials (first wall components and joining techniques), Remote handling and viewing systems, and Superconductors

  11. Transference of know-how for the fabrication of heavy components for nuclear power reactors

    International Nuclear Information System (INIS)

    Meier, F.

    1977-01-01

    1) Heavy components for nuclear power reactors. Reactor pressure vessels with total weight of 540 tons; steam generators: heat exchangers with U-type tube bundles, total weight 420 tons. 2) Choice of know-how recipient. Technical criteria, i.e. manufacturing facilities, existing quality assurance system, location of the workshops, possibilities for training, infrastructures. 3. Measures for transferring know-how to a newly established company. Planning and erection of the factory: organisational set up of the company; personnel selection and training; transfer of documentation; transfer of know-how that cannot be transferred in a written form. 4) Contracts for assuring the transfer of know-how. Stipulation of mutual rights and obligations of the know-how owner and receiver in individual contracts: engineering services contract, technical information contract, personnel training contract, license contract. (orig.) [de

  12. Case studies on the success or failure of futures contracts.

    Directory of Open Access Journals (Sweden)

    Hilary Till

    2015-06-01

    Full Text Available Why do some futures contracts succeed and others fail? Although the U.S. futures markets have evolved in a trial-and-error fashion, research suggests key elements have determined whether particular futures contracts succeeded or failed. This knowledge could be useful for new financial centers as they build successful futures markets. This paper shows that there are three elements that determine whether a futures contract succeeds or not: 1. There must be a commercial need for hedging; 2. A pool of speculators must be attracted to a market; and 3. Public policy should not be too adverse to futures trading

  13. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  14. The Termination of Administrative Contracts in the Romanian and French Law

    Directory of Open Access Journals (Sweden)

    Cătălin-Silviu SĂRARU

    2011-11-01

    Full Text Available The overall objective of this paper is to present a topic of great interest for the present activity of the public administration that emphasizes the contractual procedures as a vital aspect of entrepreneurial governance. Thus, this article is devoted to a summary of the results of an exploratory research on the conditions for termination of administrative contracts. This study analyzed the conditions under which the administrative contracts can be terminated in the Romanian and French law. The analysis using the comparative method based on a descriptive documentary research, emphasizing the particularities of termination in administrative law in relation to private law. The research is finally recovered by „de lege ferenda” proposals which should, in our opinion, to be reflected in future of the Romanian Administrative Procedure Code. The study is first research in this field in Romania and respond to concrete problems arising in the practice of public administration. The work will have significant implications and for researchers of the administrative phenomenon that in future studies will deepen the problems analyzed here. The work captures doctrinal opinions expressed in comparative law and comes with new legal reasoning to support the research for the juridical institution of the administrative contracts termination.

  15. The Labour Contract as a Basis of Appearance of Labour Relations

    OpenAIRE

    Вишновецька, Світлана Василівна; Національний авіаційний університет; Такаджі, Людмила Геннадіївна; Національний авіаційний університет

    2016-01-01

    The article is devoted to research of labour contract as a basis of appearance of labour relations. The problems of conclusion of labour contract, its entry into force, the time of appearance of the labour relationship are very topical. The labour contract is the main form of realization of the right to work, a basis of appearance of labour relations that makes legal base for their functioning. Before December 28th, 2014 the actual admission to work was a basis of appearance of labour relatio...

  16. Toward a better understanding of psychological contract breach: a study of customer service employees.

    Science.gov (United States)

    Deery, Stephen J; Iverson, Roderick D; Walsh, Janet T

    2006-01-01

    Experiences of psychological contract breach have been associated with a range of negative behavior. However, much of the research has focused on master of business administration alumni and managers and made use of self-reported outcomes. Studying a sample of customer service employees, the research found that psychological contract breach was related to lower organizational trust, which, in turn was associated with perceptions of less cooperative employment relations and higher levels of absenteeism. Furthermore, perceptions of external market pressures moderated the effect of psychological contract breach on absenteeism. The study indicated that psychological contract breach can arise when employees perceive discrepancies between an organization's espoused behavioral standards and its actual behavioral standards, and this can affect discretionary absence. (c) 2006 APA, all rights reserved.

  17. Muscle contraction analysis with MRI image

    International Nuclear Information System (INIS)

    Horio, Hideyuki; Kuroda, Yoshihiro; Imura, Masataka; Oshiro, Osamu

    2010-01-01

    The MRI measurement has been widely used from the advantage such as no radiation exposure and high resolution. In various measurement objects, the muscle is used for a research and clinical practice. But it was difficult to judge static state of a muscle contraction. In this study, we focused on a proton density change by the blood vessel pressure at the time of the muscle contraction, and aimed the judgments of muscle contraction from variance of the signal intensity. First, the background was removed from the measured images. Second, each signal divided into the low signal side and the high signal side, and variance values (σ H , σ L ) and the ratio (μ) were calculated. Finally, Relax and strain state ware judged from the ratio (μ). As a Result, in relax state, ratio (μ r ) was 0.9823±0.06133. And in strain state, ratio (μ s ) was 0.7547±0.10824. Therefore, a significant difference was obtained in relax state and strain state. Therefore, the strain state judgment of the muscle was possible by this study's method. (author)

  18. The effects of area contraction on the performance of UNITEN's shock tube: Numerical study

    International Nuclear Information System (INIS)

    Mohsen, A M; Yusoff, M Z; Al-Falahi, A

    2013-01-01

    Numerical study into the effects of area contraction on shock tube performance has been reported in this paper. The shock tube is an important component of high speed fluid flow test facility was designed and built at the Universiti Tenaga Nasional (UNITEN). In the above mentioned facility, a small area contraction, in form of a bush, was placed adjacent to the diaphragm section to facilitate the diaphragm rupturing process when the pressure ratio across the diaphragm increases to a certain value. To investigate the effects of the small area contraction on facility performance, numerical simulations were conducted at different operating conditions (diaphragm pressure ratios P 4 /P 1 of 10, 15, and 20). A two-dimensional time-accurate Navier-Stokes CFD solver was used to simulate the transient flow in the facility with and without area contraction. The numerical results show that the facility performance is influenced by area contraction in the diaphragm section. For instance, when operating the facility with area contraction using diaphragm pressure ratio (P 4 /P 1 ) of 10, the shock wave strength and shock wave speed decrease by 18% and 8% respectively.

  19. Performance-based contracting in public procurement of developing countries

    NARCIS (Netherlands)

    Ambaw, Baynesagn Asfaw

    2017-01-01

    This research is focused on the application of Performance-based Contracting (PBC) in public procurement system of developing countries. We define five research objectives (ROs) that focus on this common issue. The first objective (RO1) mainly deals with the theory behind and the theoretical

  20. Cholesterol inhibits entotic cell-in-cell formation and actomyosin contraction.

    Science.gov (United States)

    Ruan, Banzhan; Zhang, Bo; Chen, Ang; Yuan, Long; Liang, Jianqing; Wang, Manna; Zhang, Zhengrong; Fan, Jie; Yu, Xiaochen; Zhang, Xin; Niu, Zubiao; Zheng, You; Gu, Songzhi; Liu, Xiaoqing; Du, Hongli; Wang, Jufang; Hu, Xianwen; Gao, Lihua; Chen, Zhaolie; Huang, Hongyan; Wang, Xiaoning; Sun, Qiang

    2018-01-01

    Cell-in-cell structure is prevalent in human cancer, and associated with several specific pathophysiological phenomena. Although cell membrane adhesion molecules were found critical for cell-in-cell formation, the roles of other membrane components, such as lipids, remain to be explored. In this study, we attempted to investigate the effects of cholesterol and phospholipids on the formation of cell-in-cell structures by utilizing liposome as a vector. We found that Lipofectamine-2000, the reagent commonly used for routine transfection, could significantly reduce entotic cell-in-cell formation in a cell-specific manner, which is correlated with suppressed actomyosin contraction as indicated by reduced β-actin expression and myosin light chain phosphorylation. The influence on cell-in-cell formation was likely dictated by specific liposome components as some liposomes affected cell-in-cell formation while some others didn't. Screening on a limited number of lipids, the major components of liposome, identified phosphatidylethanolamine (PE), stearamide (SA), lysophosphatidic acid (LPA) and cholesterol (CHOL) as the inhibitors of cell-in-cell formation. Importantly, cholesterol treatment significantly inhibited myosin light chain phosphorylation, which resembles the effect of Lipofectamine-2000, suggesting cholesterol might be partially responsible for liposomes' effects on cell-in-cell formation. Together, our findings supporting a role of membrane lipids and cholesterol in cell-in-cell formation probably via regulating actomyosin contraction. Copyright © 2017 Elsevier Inc. All rights reserved.

  1. Proposal for the award of a contract for the provision of cooling water treatment services

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for cabling and minor mechanical work on components of CERN accelerators and experiments. Following a market survey carried out among 62 firms in fifteen Member States, a call for tenders (IT-3214/EST/A) was sent on 1 August 2003 to three firms and two consortia in four Member States. By the closing date, CERN had received four tenders from four consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AMEC SPIE (FR) - CEGELEC (FR) - AMEC SPIE (NL), the lowest bidder, for cabling and minor mechanical work on components of CERN accelerators and experiments for a total amount not exceeding 1 040 968 euros (1 608 915 Swiss francs), covering an initial period of three years starting on 1 January 2004, not subject to revision. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium ...

  2. Public Service Motivation Differences BetweenPermanent and Contract Employees in the Local Government

    Directory of Open Access Journals (Sweden)

    Wayu Eko Yudiatmaja

    2017-12-01

    Full Text Available This article examines the distinction of public service motivation (PSM on street-level bureaucracy in Indonesia. Focus of this study is to review the differentiation of public service motivation between permanent and contract employees in sub-districts of Tanjungpinang, Kepulauan Riau. The dimensions and indicators of Perry’s (1996 measurement of PSM is used to analyze the differentiation of public service motivation between permanent and contract employees. Independent sampel t-test has employed to 129 government employees and 74 non-government employees in Tanjungpinang. Unlike in developed countries that PSM of its civil services are higher than PSM of contract employees, the findings of this research proves that there is no differences between PSM of permanent and contract employees. The findings of this research rejects the conclusion of foreign scholars suggesting the PSM construct was viable for internationally environment.

  3. Compilation of contract research for the Materials Engineering Branch, Division of Engineering Technology. Annual report for FY 1983. Vol.2

    International Nuclear Information System (INIS)

    1984-03-01

    This report presents summaries of the research work performed during Fiscal Year 1983 by laboratories and organizations under contracts administered by the NRC's Materials Engineering Branch, Office of Nuclear Regulatory Research. Each contractor has written a more complete and detailed annual report of their work which can be obtained by writing to NRC. The contractor reports are organized into the major areas of concern to Primary System Integrity, which is the main focus for the branch's research. These areas are: Vessel and Piping Fracture Mechanics; Pressure Vesel Surveillance Dosimetry; Steam Generators, Aging, and Environmental Cracking; and Non-Destructive Examination. The research programs reported provide information on the overall program objectives, a more limited scope of work for FY 1983, a technical description of the year's work, and a brief forecast of the plans for continuing work

  4. Intramuscular fatty acid metabolism in contracting and non-contracting human skeletal muscle

    DEFF Research Database (Denmark)

    Sacchetti, M; Saltin, B; Osada, T

    2002-01-01

    The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercis...... and degraded and that the metabolic fate of plasma NEFA entering the muscle is influenced by muscle contraction, so that a higher proportion is directed towards oxidation at the expense of storage in mTAG.......The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercise.......05) in the contracting muscle, whereas it was unchanged in the non-contracting muscle. The uptake of plasma NEFA, as well as the proportion directed towards oxidation, was higher in the exercising compared to the non-exercising leg, whereas the rate of palmitate incorporation into mTAG was fourfold lower (0.70 +/- 0...

  5. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  6. MEDIATION CLAUSE IN COMMERCIAL CONTRACTS (THE ADVANTAGES OF MEDIATION CLAUSE IN COMMERCIAL CONTRACTS

    Directory of Open Access Journals (Sweden)

    Claudiu Florinel Augustin Ignat

    2013-11-01

    Full Text Available It often happens that the end of the contracts to be existing commercial relationships and a new contract has already intuitu personae character. But not always the case, that those who enter into legal commercial forcing consideration to the benefits and under commercial contracts, know the dealer or individual that established commercial relations. These traders resort to contractual conditions which states precisely the extent of the obligations assumed by each party, setting rules, deadlines, penalties and even ways of interpretation of contracts. Contracting Parties, namely traders aware that the law is the contract parties by special caluze invest ( to settle disputes concerning the interpretation or punishment for failure and even termination obligations tribunalule arbitration courts or the territorial and material .

  7. Research activities of MPA, Stuttgart University, for enhanced safety and reliability of components under complex load

    International Nuclear Information System (INIS)

    Herter, K.H.; Roos, E.; Schuler, X.; Maile, K.

    2004-01-01

    MPA research activities focus on fracture prevention and on the development of a generally applicable method of component integrity testing which, independent of the safety relevance of the components involved, is also part of ageing management. (orig.) [de

  8. The Emergence of Contract Agriculture in Algeria | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Over the past few decades, different types of contract arrangements between farmers ... The research team will also analyze how public-private partnerships might ... of government to protect smaller farmers and promote private sector growth.

  9. Hedgehogs, Foxes, Ethics, and the Evolving Social Contract in Psychology.

    Science.gov (United States)

    Rosnow, Ralph L.

    This paper discusses the importance of ethics in psychological research. It defines the social contract between psychological science and society as the responsibility not to do psychological or physical harm to any research participants and to do beneficial research in a way that will produce valid research. Also explored are ways in which…

  10. The Importance of Employment Contract for Umsida Quality Employees Improvement

    Directory of Open Access Journals (Sweden)

    Noor Fatimah Mediawati

    2015-12-01

    Full Text Available The absence of employment contracts in UMSIDA recognized cause some problems. Especially in improving the performance of employees. Issues a little more disturbing harmonious labor relations between employees and UMSIDA. In the terminology of the Labour Act, employment contract terms it is known as the Employment Agreement. Where the existence of labor agreement / contract employment is expected to harmonize the working relationship with the employer in accordance with the applicable rules. The existence of employment contracts is also a legal instrument which according to researchers ought to be put forward in efforts to increase the qualifications and competence of employees. By contract it will also avoid things that are not desirable in an employment relationship, because each party will always carry out their rights and responsibilities are aligned and balanced. Tranquility in the work and the guarantee of legal protection are expected to improve employee performance especially towards quality UMSIDA 2020. So this study explored further the urgency employment contract once its design. How To Cite: Mediawati, N., & Phahlevy, R. (2015. The Importance of Employment Contract for Umsida Quality Employees Improvement. Rechtsidee, 2(2, 141-156. doi:http://dx.doi.org/10.21070/jihr.v2i2.106

  11. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  12. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  13. Peer-to-peer psychological contracts in the South African wine industry

    Directory of Open Access Journals (Sweden)

    Ruth Penfold

    2015-12-01

    Full Text Available Orientation: Very few studies examine the impact of peer relationships on the psychological contract. Research purpose: Using the backdrop of wine farm workers in the Western Cape, South Africa, the aim of our study was to explore the nature of peer relationships shaping the psychological contract. Motivation for the study: The agricultural sector of South Africa, in particular the wine farms in the Western Cape, has undergone radical change in the past decades as a result of labour legislation and changing government structures. It was therefore expected that these changes would influence the psychological contracts held by wine farm workers. Research approach, design and method: This qualitative study sampled all 24 full-time employees and 2 managers on the Constantia Hills Wine Estate in Cape Town, South Africa. Semi-structured interviews were conducted using the critical incident technique in combination with a series of open questions. Main findings: Our findings showed support for the existence of peer-to-peer psychological contracts and noted the valuable influence of a suitable conduit individual on the relationship between employees and their employer. Practical and/or managerial implications: Wine farm workers in South Africa have a strong need to be consulted after a lifetime of having no voice. In addition to ensuring suitable levels of two-way communication, management must understand the inter-peer contract and the nature of the relationships sustaining it. Contribution: Whilst literature has suggested that management of the psychological contract lies firmly within the domain of the employer, our findings indicated that ensuring harmonious peer-to-peer contracts was also central to good working relationships.

  14. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  15. Compliance revisited: pharmaceutical drug trials in the era of the contract research organization.

    Science.gov (United States)

    Jonvallen, Petra

    2009-12-01

    Over the past decade, the management of clinical trials of pharmaceuticals has become a veritable industry, as evidenced by the emergence and proliferation of contract research organizations (CROs) that co-ordinate and monitor trials. This article focuses on work performed by one CRO involved in the introduction of new software, modelled on industrial production processes, into clinical trial practices. It investigates how this new management technique relates to the work performed in the clinic to ensure that trial participants comply with the protocol. Using an analytical distinction between 'classical' management work and invisible work, the article contextualizes the meaning of compliance in the clinic and suggests that the work involved in producing compliance should be taken into consideration by those concerned with validity of trials, as clinical trials are put under private industrial management. The article builds on participant observation at a Swedish university hospital and interviews the nurses, dieticians, doctors and a software engineer, all part of a team involved in pharmaceutical drug trials on a potential obesity drug.

  16. Precarious Pedagogies? The Impact of Casual and Zero-Hour Contracts in Higher Education

    Directory of Open Access Journals (Sweden)

    Ana Lopes

    2015-05-01

    Full Text Available Precarious work is associated with and characterizes the effects of neoliberal policy—the transference of economic risk onto workers, the erosion of workers’ rights, the flexibilization and casualization of work contracts, self-responsibility, financial insecurity, and emotional stress. In the Higher Education (HE sector, the number of insecure academic jobs, especially zero-hour contracts for hourly paid teaching and short-term contract research, has grown exponentially in recent years in response to the structural and fiscal changes within universities, which reflect these global shifts. This paper presents findings from a pilot study conducted with academics on casual contracts in HE institutions in England and Wales. Qualitative interviews and focus groups were undertaken with teachers (lecturers and tutors on hourly paid and zero-hour contracts to examine the relationship between their contractual situations and pedagogical practices. The research broadly seeks to contribute to ongoing discussions concerned with the impact of neoliberalism on higher education and specifically highlights the case of contingent lecturers as casualties of the casualization of the academic labor force.

  17. Features of the content of corporate contracts

    Directory of Open Access Journals (Sweden)

    Elena Petrovna Gladneva

    2015-09-01

    Full Text Available Objective to study the legal nature to reveal the peculiarities of the subject and other essential terms of corporate contracts as a technique and means of legal regulation of corporate relations. Methods general and specific methods of cognition dialectical formal logic analysis synthesis modeling structural and systemicfunctional methods as well as comparative legal logical legal historical legal grammatical methods and systemic interpretation. Results it is concluded that the object of corporate contracts includes terms about the features of implementation of corporate rights for shares and share in capital assets conditions order of the implementation of corporate rights and approval of other actions related to company management activity reorganization and liquidation the passive duty of corporate organizations to refrain from committing any action authority arising from the nature of corporate agreements as well as the active responsibilities associated with the certain implementation of corporate rights certified by stocks shares rights to stocks shares. In addition to the subject the content of corporate contractsincludes other essential necessary conditions stipulated by the corporate legislation norms and the agreement of the participants of economic entity. Scientific novelty for the first time taking into account modern achievements of civilistic jurisprudence and practice the authors investigate the relationship between the concepts of a civil contract and corporate contract give the definition of corporate contract show the specificity of the subject and other material terms of corporate contracts. Practical significance the findings can be taken into account in the further research of corporate law issues as subbranch of civil law used in law making and enforcement activities in the educational process as a teaching material in civil law. nbsp

  18. Industrial Services Contracts

    CERN Document Server

    2006-01-01

    This document gives an overview of Industrial Services contracts at CERN, including the probable expenditure in 2006 and the estimated expenditure for 2007. The Finance Committee is invited: - to take note of the revised amount in 2006 for Industrial Services contracts referred to in this document of 138.02 MCHF at 2006 prices compared to the previously anticipated amount of 122.67 MCHF at 2005 prices; - to take note that the estimated amount in 2007 for the contracts referred to in this document will be 112.54 MCHF at 2006 prices; - for the reasons set out in this document, the Finance Committee is also invited to approve the requests for the contracts presented and highlighted in the Annexes.

  19. 41 CFR 102-85.40 - What are the major components of the pricing policy?

    Science.gov (United States)

    2010-07-01

    ... components of the pricing policy? 102-85.40 Section 102-85.40 Public Contracts and Property Management...-PRICING POLICY FOR OCCUPANCY IN GSA SPACE Pricing Policy-General § 102-85.40 What are the major components of the pricing policy? The major components of the pricing policy are: (a) An OA between a customer...

  20. The Effects of Eccentric Contraction Duration on Muscle Strength, Power Production, Vertical Jump, and Soreness.

    Science.gov (United States)

    Mike, Jonathan N; Cole, Nathan; Herrera, Chris; VanDusseldorp, Trisha; Kravitz, Len; Kerksick, Chad M

    2017-03-01

    Mike, JN, Cole, N, Herrera, C, VanDusseldorp, T, Kravitz, L, and Kerksick, CM. The effects of eccentric contraction duration on muscle strength, power production, vertical jump, and soreness. J Strength Cond Res 31(3): 773-786, 2017-Previous research has investigated the effects of either eccentric-only training or comparing eccentric and concentric exercise on changes related to strength and power expression, but no research to date has investigated the impact of altering the duration of either the concentric or the eccentric component on these parameters. Therefore, the purpose of this study was to assess the duration of eccentric (i.e., 2-second, 4-second vs. 6-second) muscle contractions and their effect on muscle strength, power production, vertical jump, and soreness using a plate-loaded barbell Smith squat exercise. Thirty college-aged men (23 ± 3.5 years, 178 ± 6.8 cm, 82 ± 12 kg, and 11.6 ± 5.1% fat) with 3.0 ± 1.0 years of resistance training experience and training frequency of 4.3 ± 0.9 days per week were randomized and assigned to 1 of 3 eccentric training groups that incorporated different patterns of contraction. For every repetition, all 3 groups used 2-second concentric contractions and paused for 1 second between the concentric and eccentric phases. The control group (2S) used 2-second eccentric contractions, whereas the 4S group performed 4-second eccentric contractions and the 6S group performed 6-second eccentric contractions. All repetitions were completed using the barbell Smith squat exercise. All participants completed a 4-week training protocol that required them to complete 2 workouts per week using their prescribed contraction routine for 4 sets of 6 repetitions at an intensity of 80-85% one repetition maximum (1RM). For all performance data, significant group × time (G × T) interaction effects were found for average power production across all 3 sets of a squat jump protocol (p = 0.04) while vertical jump did not reach

  1. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  2. Designs of contraction nozzle and concave back-wall for IFMIF target

    Energy Technology Data Exchange (ETDEWEB)

    Ida, Mizuho E-mail: ida@ifmif.tokai.jaeri.go.jp; Nakamura, Hideo; Nakamura, Hiroo; Takeuchi, Hiroshi

    2004-02-01

    For the liquid lithium flow target of International Fusion Materials Irradiation Facility (IFMIF), the double reducer (two-step contraction) nozzle with a high-contraction ratio of 10 which generated high-speed uniform jet flows up to 20 m/s was proposed. Multi-dimensional hydraulic analyses were carried out to verify the performance of the proposed nozzle. The analytical results showed that the double reducer nozzle would well generate high-speed uniform flow, while one-step contraction nozzle generated non-uniform flow and resulted in flow thickening at the beam footprint. For the target design, the range of the concave back-wall radius with no lithium boiling due to the centrifugal force and proper component arrangement in the irradiation test cell was determined by the thermal-hydraulic analysis of a free-surface flow. It was verified that the back-wall radius from 0.25 to 10 m was acceptable in the velocity range of 10-20 m/s.

  3. Designs of contraction nozzle and concave back-wall for IFMIF target

    International Nuclear Information System (INIS)

    Ida, Mizuho; Nakamura, Hideo; Nakamura, Hiroo; Takeuchi, Hiroshi

    2004-01-01

    For the liquid lithium flow target of International Fusion Materials Irradiation Facility (IFMIF), the double reducer (two-step contraction) nozzle with a high-contraction ratio of 10 which generated high-speed uniform jet flows up to 20 m/s was proposed. Multi-dimensional hydraulic analyses were carried out to verify the performance of the proposed nozzle. The analytical results showed that the double reducer nozzle would well generate high-speed uniform flow, while one-step contraction nozzle generated non-uniform flow and resulted in flow thickening at the beam footprint. For the target design, the range of the concave back-wall radius with no lithium boiling due to the centrifugal force and proper component arrangement in the irradiation test cell was determined by the thermal-hydraulic analysis of a free-surface flow. It was verified that the back-wall radius from 0.25 to 10 m was acceptable in the velocity range of 10-20 m/s

  4. DOD Electronic Commerce (EC)/Electronic Data Interchange (EDI) in contracting report

    Science.gov (United States)

    1993-12-01

    Use of Electronic Commerce (EC)/Electronic Data Interchange (EDI) to support Department of Defense (DoD) procurement processes has been under consideration for some time. A 1988 Deputy Secretary of Defense memo calls for maximum use of EDI, based on 10 years of DoD EDI investigation and experiments. In 1990, Defense Management Review Decision 941 stated, 'The strategic goal of DoD's current efforts is to provide the department with the capability to initiate, conduct, and maintain its external business related transactions and internal logistics, contracting, and financial activities without requiring the use of hard copy media.' The EC in Contracting PAT membership reflected a broad cross section of Military Services and Defense Agencies working on a full-time basis for 60 days. The diversity of the EC in Contracting PAT ensured that the needs and concerns of all DoD components were addressed during the creation of the report. The resultant plan, therefore, represents a comprehensive approach for implementing EC throughout the DoD.

  5. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  6. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  7. CONSIDERATION ON THE LEGAL REGIME APPLICABLE TO INTERNATIONAL TOURISM CONTRACTS

    Directory of Open Access Journals (Sweden)

    Serban-Alexandru STANESCU

    2017-07-01

    Full Text Available Upon conclusion of an international tourism contract, the contracting parties - one of which (the beneficiary acts as the consumer – are facing legal difficulties, which are addressed by this study from the perspective of the interference between the national law and the European Union law. Thus, one of the primary issues considered herein is that concerning the determination of the applicable law based on which the rights and obligations of the contracting parties are to be established. Secondly, this study examines the applicable procedural rules in the case where a Romanian court is requested to settle a dispute arising from an international tourism contract. Finally, the study deals with the hypothesis where a dispute arising from such a contract is settled by a foreign court, and in particular with the effects of the judgment given by the foreign court on the territory of Romania. The above mentioned issues are the grounds behind this research on the legal status of international tourism contracts, in addition to the fact that, despite the rich contractual practice in the field under consideration, the amount of specialized literature on this subject is rather limited.

  8. 3-OST-7 regulates BMP-dependent cardiac contraction.

    Directory of Open Access Journals (Sweden)

    Shiela C Samson

    2013-12-01

    Full Text Available The 3-O-sulfotransferase (3-OST family catalyzes rare modifications of glycosaminoglycan chains on heparan sulfate proteoglycans, yet their biological functions are largely unknown. Knockdown of 3-OST-7 in zebrafish uncouples cardiac ventricular contraction from normal calcium cycling and electrophysiology by reducing tropomyosin4 (tpm4 expression. Normal 3-OST-7 activity prevents the expansion of BMP signaling into ventricular myocytes, and ectopic activation of BMP mimics the ventricular noncontraction phenotype seen in 3-OST-7 depleted embryos. In 3-OST-7 morphants, ventricular contraction can be rescued by overexpression of tropomyosin tpm4 but not by troponin tnnt2, indicating that tpm4 serves as a lynchpin for ventricular sarcomere organization downstream of 3-OST-7. Contraction can be rescued by expression of 3-OST-7 in endocardium, or by genetic loss of bmp4. Strikingly, BMP misregulation seen in 3-OST-7 morphants also occurs in multiple cardiac noncontraction models, including potassium voltage-gated channel gene, kcnh2, affected in Romano-Ward syndrome and long-QT syndrome, and cardiac troponin T gene, tnnt2, affected in human cardiomyopathies. Together these results reveal 3-OST-7 as a key component of a novel pathway that constrains BMP signaling from ventricular myocytes, coordinates sarcomere assembly, and promotes cardiac contractile function.

  9. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  10. Research regarding reverse engineering for aircraft components

    Directory of Open Access Journals (Sweden)

    Udroiu Razvan

    2017-01-01

    Full Text Available Reverse engineering is a useful technique used in manufacturing and design process of new components. In aerospace industry new components can be developed, based on existing components without technical Computer Aided Design (CAD data, in order to reduce the development cycle of new products. This paper proposes a methodology wherein the CAD model of turbine blade can be build using computer aided reverse engineering technique utilising a 5 axis Coordinate Measuring Machine (CMM. The proposed methodology uses a scanning strategy by features, followed by a design methodology for 3D modelling of complex shapes.

  11. Organisation of biological research carried out in the United States by the A.E.C. or under her contract (1960)

    International Nuclear Information System (INIS)

    Pellerin, J.

    1960-01-01

    This report is based on information gathered in the course of a trip to the United States, in November and December 1958 which consisted chiefly of visits to the main biological and medical research laboratories and discussions with the heads of these establishments. A description is given of the general organisation of the Atomic Energy Commission's Division of Biology and Medicine, and of the distribution of responsibility for radiation protection work and for biological, medical and agricultural research amongst the various Services attached to it; this is followed by a more detailed account of the activities carried on in this field at the great national laboratories. Finally, the systems of collaboration set up with external research organisations in the form of research contracts are examined, together with the substantial help provided by the A.E.C. for biological, medical and agricultural research in general, owing to a systematic policy of subsidising the distribution of radioisotopes for this purpose. (author) [fr

  12. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  13. Inertial Confinement Fusion Target Component Fabrication and Technology Development report

    International Nuclear Information System (INIS)

    Steinman, D.

    1994-03-01

    On December 30, 1990, the US Department of Energy entered into a contract with General Atomics (GA) to be the Inertial Confinement Fusion Target Component Fabrication and Technology Development Support contractor. This report documents the technical activities which took place under this contract during the period of October 1, 1992 through September 30, 1993. During this period, GA was assigned 18 tasks in support of the Inertial Confinement Fusion program and its laboratories. These tasks included ''Capabilities Activation'' and ''Capabilities Demonstration'' to enable us to begin production of glass and composite polymer capsules. Capsule delivery tasks included ''Small Glass Shell Deliveries'' and ''Composite Polymer Capsules'' for Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory (LANL). We also were asked to provide direct ''Onsite Support'' at LLNL and LANL. We continued planning for the transfer of ''Micromachining Equipment from Rocky Flats'' and established ''Target Component Micromachining and Electroplating Facilities'' at GA. We fabricated over 1100 films and filters of 11 types for Sandia National Laboratory and provided full-time onsite engineering support for target fabrication and characterization. We initiated development of methods to make targets for the Naval Research Laboratory. We investigated spherical interferometry, built an automated capsule sorter, and developed an apparatus for calorimetric measurement of fuel fill for LLNL. We assisted LANL in the ''Characterization of Opaque b-Layered Targets.'' We developed deuterated and UV-opaque polymers for use by the University of Rochester's Laboratory for Laser Energetics (UR/LLE) and devised a triple-orifice droplet generator to demonstrate the controlled-mass nature of the microencapsulation process

  14. Robust size illusion produced by expanding and contracting flow fields.

    Science.gov (United States)

    Dong, Xue; Bai, Jianying; Bao, Min

    2017-04-01

    A new illusion is described. Randomly positioned dots moved radially within an imaginary annular window. The dots' motion periodically changed the direction, leading to an alternating percept of expanding and contracting motion. Strikingly, the apparent size of the enclosed circular region shrank during the dots' expanding phases and dilated during the contracting phases. We quantitatively measured the illusion, and found that the presence of energy at the local kinetic edge could not account for the illusion. Besides, we reproduced the illusion on a natural scene background seen from a first-person point of view that moved forward and backward periodically. Blurring the boundaries of motion areas could not reverse the illusion in all subjects. Taken together, our observed illusion is likely induced by optic flow processing with some components of motion contrast. Expanding or contracting dots may induce the self-motion perception of either approaching or leaving way from the circle. These will make the circle appear smaller or larger since its retinal size remains constant. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Other enrichment related contracts

    International Nuclear Information System (INIS)

    Hall, J.C.

    1978-01-01

    In addition to long-term enrichment contracts, DOE has other types of contracts: (1) short-term, fixed-commitment enrichment contract; (2) emergency sales agreement for enriched uranium; (3) feed material lease agreement; (4) enriched uranium storage agreement; and (5) feed material usage agreement

  16. FREEDOM OF CONTRACT AND ITS LIMITATIONS IN THE ROMANIAN CIVIL CODE

    Directory of Open Access Journals (Sweden)

    EUGENIA VOICHECI

    2013-05-01

    Full Text Available This study aims to present the vision of the Romanian Civil Code about the freedom of contracting. The Romanian legislator has restated in terminis that the principle of contractual freedom is a fundament of the conventions but has also established its restraints: the law, the public order and the moral values. In order to attain the stated goal of this research, the effort was directed toward: presenting the freedom to contract as a principle of the private law, evoking the autonomy of the will theory as a fundament for the freedom to contract and toward systemically enunciating the competing theories and the decline of the actual autonomy of the will theory. The effort was also directed toward presenting the restraints of the freedom to contract, as they are stated in the Civic Code and the different categories of contracts which are the consequence of those restraints.

  17. Contract portfolio optimization for a gasoline supply chain

    Science.gov (United States)

    Wang, Shanshan

    this model, we characterize a simple and easily implementable dynamic contract portfolio policy that would enable the company to dynamically rebalance its supply contract portfolio over time in anticipation of the future market conditions in each individual channel while satisfying the contractual obligations. The optimal policy is a state-dependent base-share contract portfolio policy characterized by a branded base-share level and an unbranded contract commitment combination, given as a function of the initial information state. Using real-world market data, we estimate the model parameters. We also apply an efficient modified policy iteration method to compute the optimal contract portfolio strategies and corresponding profit value. We present computational results in order to obtain insights into the structure of optimal policies, capture the value of the dynamic contract portfolio policy by comparing it with static policies, and illustrate the sensitivity of the optimal contract portfolio and corresponding profit value in terms of the different parameters. Considering the geographic dispersion of different market areas and the pipeline network together with the dynamic contract portfolio optimization problem, we formulate a forward-looking operational model, which could be used by gasoline suppliers for lower-level planning. Finally, we discuss the generalization of the framework to other problems and applications, as well as further research.

  18. 48 CFR 1316.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1316.406 Section 1316.406 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.406 Contract clauses. Insert a clause...

  19. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  20. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  1. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... a risk that taxpayer funds will be spent on contracts that are wasteful, inefficient, subject to... mission. In such cases, the agency must ensure that the risks associated with noncompetitive contracts are...

  2. Contract Management Monitoring And Evaluation Of Ghana School Feeding Programme At Atwima Kwanwoma District

    Directory of Open Access Journals (Sweden)

    Andrews Osei Mensah

    2015-08-01

    Full Text Available Ghana School Feeding Programme was introduced at Atwima Kwanwoma District and other parts of the country in 2008 to alleviate hunger and to provide good nutrition for pupils in the public basic schools. Caterers were given contract to provide food to the school pupils on every school-going day under Ghana school feeding programme. Some years have lapsed and there is the need to look back and evaluate this programme taking into consideration the award and management of those contracts. The study also examined how the programme is monitored and evaluated. Data was collected from 80 respondents comprising 29 school pupils and 51 other actors through the use of questionnaire and interview guide It was realised that caterers who are well experience in catering services were awarded contracts based on their past experience and financial abilities through submission of their certificates but not necessarily through bidding. The main component of managing the caterers contract included monitoring payment of debt and problems solving as well as supervision through visiting the schools on quarterly basis. The programme has helped to increase enrolment and retaining pupils in school. It was found out that food giving to the pupils was not served on time not regularly bases and was not sufficient to the pupils as well. The health component of the programme has not been successful as expected. It is recommended that fruits and variety of foods need to be introduced together with de-worming the pupils.

  3. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  4. Temporary labour contracts

    CERN Document Server

    2000-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L 021/PE, L 022/PE, L 023/PE and L 024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) reached the end of their initial three-year contractual period at the end of December 1999. At CERN?s request, in September 1999 the Finance Committee approved an extension of these contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs (CERN/FC/4196). In December 1999, one of the five contractors, FIRCROFT, withdrew from its contract for 2000. Following the satisfactory execution of the four remaining contracts during 2000, CERN requests approval to extend them from January 2001 for the second of the two optional years provided for in the original adjudication. The Finance Committee is invited to approve the extension of the existing contracts until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices.

  5. Networks and informal contract law

    NARCIS (Netherlands)

    Tjong Tjin Tai, Eric; Brownsword, Roger; van Gestel, Rob A.J.; Micklitz, Hans-W.

    2017-01-01

    It is often argued that formal contract law cannot treat networks correctly. An analysis of networks in an informal contract law system shows that informal contract law is no panacea. Remaining problems require a different approach to legal regulation and contract practice.

  6. Characteristics of nuclear contracts. Pt. 1

    International Nuclear Information System (INIS)

    Blanchard, R.

    1976-01-01

    While the object of nuclear contracts is specific, these contracts are concluded according to proven techniques based on general regulations on contracts. Following a review of contract classification, they are differentiated according to the nature of the co-contracting parties, the purpose of the contract itself, the procedure for drawing up the contracts, and payment. The operations prior to the contract vary in that they may include a call for tenders, an option for delays or a letter of intent. (NEA) [fr

  7. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  8. Adding Concurrency to Smart Contracts

    OpenAIRE

    Dickerson, Thomas; Gazzillo, Paul; Herlihy, Maurice; Koskinen, Eric

    2017-01-01

    Modern cryptocurrency systems, such as Ethereum, permit complex financial transactions through scripts called smart contracts. These smart contracts are executed many, many times, always without real concurrency. First, all smart contracts are serially executed by miners before appending them to the blockchain. Later, those contracts are serially re-executed by validators to verify that the smart contracts were executed correctly by miners. Serial execution limits system throughput and fails ...

  9. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may... Agency-specific indefinite quantity contracts that are a combination of contract types. Rather than using...

  10. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  11. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...

  12. Strategic Inventories in Vertical Contracts

    OpenAIRE

    Krishnan Anand; Ravi Anupindi; Yehuda Bassok

    2008-01-01

    Classical reasons for carrying inventory include fixed (nonlinear) production or procurement costs, lead times, nonstationary or uncertain supply/demand, and capacity constraints. The last decade has seen active research in supply chain coordination focusing on the role of incentive contracts to achieve first-best levels of inventory. An extensive literature in industrial organization that studies incentives for vertical controls largely ignores the effect of inventories. Does the ability to ...

  13. Designation of Contracting Officers Representatives and Oversight Framework Could Be Improved for Contracts in Afghanistan

    Science.gov (United States)

    2016-08-30

    Sea Systems issue guidance to contracting officers to obtain a quality assurance surveillance plan for all service contracts, and ensure that the...prepare a quality assurance surveillance plan (QASP) for service contracts in order to facilitate assessment of contractor performance.12 Furthermore...that the contracting activities received and paid for goods or services that did not meet contract performance standards. At the time of the audit

  14. New staff contract policy

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  15. Explaining the contract terms of energy performance contracting in China: The importance of effective financing

    International Nuclear Information System (INIS)

    Li, Yan; Qiu, Yueming; Wang, Yi David

    2014-01-01

    Energy service company (“ESCO”) uses Energy Performance Contracting (“EPC”) to provide energy-saving services to its clients. Under an EPC, both ESCO and the client invest in the energy efficiency measures, according to a negotiated share of investment. Within the length of the contract, the ESCO and its client divide up the saved energy bill according to a negotiated share. Once the contract expires, the client claims all of the saved energy bills if the energy efficiency measures still last. Different EPC projects have different contract terms, including total investment, share of investment and length of contract. These contract terms directly determine the resulted energy savings. Thus it is essential and important to look at how these contract terms are formed and what are the major influencing factors. This paper first builds a theoretical bargain model between ESCO and its client to find out the structural relationship among these contract terms. Then, using the information of about 140 EPC contracts in China in 2010 and 2011, the paper empirically estimates the impacts of various factors on the contract terms and the resulted energy savings. We find that cost of capitals for ESCOs and the clients, especially for ESCOs, is a major factor influencing contract terms and the resulted energy savings. Thus providing effective financing is critical for the development of EPC in China. - Highlights: • We build a theoretical bargain model between an ESCO and its client. • We empirically quantify the impacts of various factors on EPC contract terms. • Cost of capital is a key factor determining EPC contract terms. • Providing effective financing, especially for ESCOs is important

  16. Sustainable Contracts in the Bottled Tawilis Value Chain in Taal, Batangas, Philippines

    Directory of Open Access Journals (Sweden)

    Cynthia V. Almazan

    2012-03-01

    Full Text Available This research was conceptualized to investigate the potential impact of contracts on the sustainability of the bottled tawilis supply chain, i.e. sustainability in terms of environmental protection, well-being of the people whose livelihood depends on tawilis production, processing and marketing; and enhanced economic gains from the chain. A survey amongst fishermen, middlemen and processors was performed in the lake Taal area. The study concludes that formal contracts, with specific demands to gear used and the handling of fish, may stimulate the catch of minimum and uniform sized fish. Such contracts may also stimulate delivery of higher quality fish by fishermen. These contracts thereby enhance sustainable fishing and increase in fishermen’s income. Direct (win-win contracts between processors and fishermen seem to be the best way to stimulate delivery of sustainably catched fish. Government should strongly increase enforcement of sustainable fishing practices and stimulate contracting for sustainable fishing in this chain.

  17. Advanced Materials Test Methods for Improved Life Prediction of Turbine Engine Components

    National Research Council Canada - National Science Library

    Stubbs, Jack

    2000-01-01

    Phase I final report developed under SBIR contract for Topic # AF00-149, "Durability of Turbine Engine Materials/Advanced Material Test Methods for Improved Use Prediction of Turbine Engine Components...

  18. The Comparison of Psychological Contract Perception of Physicians and Nurses

    Directory of Open Access Journals (Sweden)

    Necmettin Cihangiroglu

    2012-02-01

    Full Text Available OBJECTIVE: In this study, it was aimed to find out if psychological contract perception of physicians and nurses is different or not. METHODS: The study has been cross sectionaly contucted from May to June 2010, in a 1200 bed education and research hospital in Ankara. We aimed at reaching all of the physicians and nurses without any sampling. A questionnaire method was used for data collection. Out of 646 surveys given out, we collected 413. To measure psychological contract perception of workers, Psychological Contract Scale with the 17 items developed by Millward and Hopkins. RESULTS: The reliability analysis of the Scale showed that Cronbach Alpha coefficient for the transactional contract dimension is 0,66, and for the relational contract dimension is 0,71. Whereas the univarite analysis showed that differences between transactional contract perception of physicians and nurses were significant multivarite variance analysis showed that differences between transactional (F=1.38, p=0.241 and relational (F=3.01, p=0.084 contract perception of physicians and nurses were not significant, and their perception related to both dimensions were affected only by their educational level (p<0.05. CONSLUSION: We hope that the results of this study provides significant information for healthcare organisation managers. But a more detailed study is needed to claim that these results are marginal. [TAF Prev Med Bull 2012; 11(1.000: 63-70

  19. Automatic Conflict Detection on Contracts

    Science.gov (United States)

    Fenech, Stephen; Pace, Gordon J.; Schneider, Gerardo

    Many software applications are based on collaborating, yet competing, agents or virtual organisations exchanging services. Contracts, expressing obligations, permissions and prohibitions of the different actors, can be used to protect the interests of the organisations engaged in such service exchange. However, the potentially dynamic composition of services with different contracts, and the combination of service contracts with local contracts can give rise to unexpected conflicts, exposing the need for automatic techniques for contract analysis. In this paper we look at automatic analysis techniques for contracts written in the contract language mathcal{CL}. We present a trace semantics of mathcal{CL} suitable for conflict analysis, and a decision procedure for detecting conflicts (together with its proof of soundness, completeness and termination). We also discuss its implementation and look into the applications of the contract analysis approach we present. These techniques are applied to a small case study of an airline check-in desk.

  20. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  1. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  2. Consequences of the Public Contract Law for Purchase of Scientific Appliances in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Martin Vyklický

    2015-01-01

    Full Text Available This article essentially covers in more detail the consequences of the present wording of the Public Contract Law for purchase of scientific appliances in the Czech Republic. The beginning of the article deals with increasing public expenses in research; then, the problem is defined concerning unsuitable wording of certain provisions of the Public Contract Law; while subsequently, the solution for the problem is searched together with the final comments. Investing of public funds into science and research is probably the most efficient in a long-term horizon. However, the flow of funds for acquisition of scientific and research equipment should be supported by appropriate legislation with such wording and form not to prevent purchases of that equipment. Availability of public funds for something which in fact cannot be, due to wrongly set legislation, acquired by a contracting authority is the problem which must be eliminated through timely implementation of the above proposed changes in the Public Contract Law.

  3. Perspective : component tracking on the Nova system

    International Nuclear Information System (INIS)

    MacDonald, S.

    1999-01-01

    The issue of introducing Component Tracking as a service to natural gas producers, shippers and straddle plant operators was discussed. Approximately 39 companies in the industry were contacted by consultants at Nova Gas Transmission in an effort to assess if introducing this service would add value to individual producers. The numerous implications that may have to be dealt with if Component Tracking is introduced were also described. Component Tracking would provide an equitable approach to the allocation of molecules in the gas stream, and could provide producers with the ability to avoid capital outlay in field plants by alternatively contracting for recovery of the liquids at the straddle plants. Component Tracking is to be voluntary and each shipper would be able to decide whether to utilize the service at each of their receipt points onto the Nova system

  4. Assessment of left ventricular contraction by parametric analysis of main motion (PAMM): theory and application for echocardiography

    International Nuclear Information System (INIS)

    Dominguez, C Ruiz; Kachenoura, N; Cesare, A De; Delouche, A; Lim, P; Gerard, O; Herment, A; Diebold, B; Frouin, F

    2005-01-01

    The computerized study of the regional contraction of the left ventricle has undergone numerous developments, particularly in relation to echocardiography. A new method, parametric analysis of main motion (PAMM), is proposed in order to synthesize the information contained in a cine loop of images in parametric images. PAMM determines, for the intensity variation time curves (IVTC) observed in each pixel, two amplitude coefficients characterizing the continuous component and the alternating component; the variable component is generated from a mother curve by introducing a time shift coefficient and a scale coefficient. Two approaches, a PAMM data driven and a PAMM model driven (simpler and faster), are proposed. On the basis of the four coefficients, an amplitude image and an image of mean contraction time are synthesized and interpreted by a cardiologist. In all cases, both PAMM methods allow better IVTC adjustment than the other methods of parametric imaging used in echocardiography. A preliminary database comprising 70 segments is scored and compared with the visual analysis, taken from a consensus of two expert interpreters. The levels of absolute and relative concordance are 79% and 97%. PAMM model driven is a promising method for the rapid detection of abnormalities in left ventricle contraction

  5. Contract law as fairness

    NARCIS (Netherlands)

    Klijnsma, J.

    2015-01-01

    This article examines the implications for contract law of Rawls' theory of justice as fairness. It argues that contract law as an institution is part of the basic structure of society and as such subject to the principles of justice. Discussing the basic structure in relation to contract law is

  6. Contractibility of curves

    Directory of Open Access Journals (Sweden)

    Janusz Charatonik

    1991-11-01

    Full Text Available Results concerning contractibility of curves (equivalently: of dendroids are collected and discussed in the paper. Interrelations tetween various conditions which are either sufficient or necessary for a curve to be contractible are studied.

  7. Collaborative Research Centre 694 “Integration of electronic components into mobile systems”-Motivation and survey

    Science.gov (United States)

    Weckenmann, Albert; Schmidt, Lorenz-Peter; Bookjans, Martin

    Within the collaborative research centre 694 'Integration of electronic components into mobile systems' intelligent mechatronic systems are explored for application at the place of action. Especially in the automotive sector highest requirements on system safety are combined with an enormous importance of the production for the whole national economy. Therefore the collaborative research centre is led by the vision to integrate electronic components in sensors and actors of mobile systems. About 30 scientists at nine participating academic and non-academic institutions in Erlangen explore mechatronic solutions for the requirements on manufacturing processes, electronic systems and quality management techniques within the car of the future.

  8. Let's be professional about this: ideology and the psychological contracts of registered nurses.

    Science.gov (United States)

    O'Donohue, Wayne; Nelson, Lindsay

    2007-07-01

    This study explores whether there is evidence of an ideological component in the psychological contracts of professional employees, as well as evidence of credible supporting commitments by their employer. Fundamental changes in the employment context have prompted many individuals to seek a closer alignment between themselves and their work, as well as with the organizational and broader societal contexts. For many professional employees identification with their professional ideology is a significant factor in producing such an alignment. The study uses an exploratory qualitative approach to analyse interview data collected from a sample of registered nurses employed in an Australian public hospital. The analysis identifies psychological contract terms best understood by reference to an ideological currency. It also suggests that the organization is perceived as obligated to provide credible support for that professional contribution, and the perceived lack of such support has significant impacts. The findings raise doubts about the utility of the concept of a psychological contract that recognizes only economic and socio-emotional exchanges for understanding the psychological contracts of professional employees.

  9. Coordinated research activities: Annual report and statistics for 2004

    International Nuclear Information System (INIS)

    2005-05-01

    , including current information on CRPs and programme areas supported, information on policies and procedures and the administration of the activities is contained in the Agency's Coordinated Research Activities website at: http://www-crp.iaea.org. The Coordinated Research Activities reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Materials Technologies; Capacity Building and Nuclear Knowledge Maintenance for Sustainable Energy Development; Nuclear Science; Food and Agriculture; Human Health; Water Resources; Protection of the Marine and Terrestrial Environments; Physical and Chemical Applications; Safety of Nuclear Installations; Radiation and Transport Safety; Management of Radioactive Waste; Nuclear Security. Results of research are available to all Member States and are disseminated through, national, international and Agency scientific and technical publications. The Coordinated Research Activities are complementary to its Technical Cooperation Projects, with the knowledge gained via coordinated research used to enhance the quality of Technical Cooperation Projects. In terms of benefits to Member States through their participating research institutions, number of awards and degree of funding, coordinated research activities constitute a significant component of the Agency's overall programme. 942 contracts and agreements were awarded from the 1244 contract and agreement proposals received by the Agency during 2004. In 2004, $6 765 324 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Coordination Meetings (RCMs). Additionally, $230 859 of extra-budgetary contributions were used to fund additional contracts and RCMs. Thus, total awards amounted to $6 996 183. The average award per contract was $6 065

  10. Coordinated research activities: Annual report and statistics for 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-05-15

    , including current information on CRPs and programme areas supported, information on policies and procedures and the administration of the activities is contained in the Agency's Coordinated Research Activities website at: http://www-crp.iaea.org. The Coordinated Research Activities reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Materials Technologies; Capacity Building and Nuclear Knowledge Maintenance for Sustainable Energy Development; Nuclear Science; Food and Agriculture; Human Health; Water Resources; Protection of the Marine and Terrestrial Environments; Physical and Chemical Applications; Safety of Nuclear Installations; Radiation and Transport Safety; Management of Radioactive Waste; Nuclear Security. Results of research are available to all Member States and are disseminated through, national, international and Agency scientific and technical publications. The Coordinated Research Activities are complementary to its Technical Cooperation Projects, with the knowledge gained via coordinated research used to enhance the quality of Technical Cooperation Projects. In terms of benefits to Member States through their participating research institutions, number of awards and degree of funding, coordinated research activities constitute a significant component of the Agency's overall programme. 942 contracts and agreements were awarded from the 1244 contract and agreement proposals received by the Agency during 2004. In 2004, $6 765 324 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Coordination Meetings (RCMs). Additionally, $230 859 of extra-budgetary contributions were used to fund additional contracts and RCMs. Thus, total awards amounted to $6 996 183. The average award per contract was $6 065.

  11. CONDITIONS AND EFFECTS OF THE COMMISSORIA LEX IN THE LEASING CONTRACT

    Directory of Open Access Journals (Sweden)

    Raluca Tomescu

    2015-11-01

    Full Text Available The main problem with the execution of a leasing contract in Romania is that there are still shortcomings to the laws in force. The complexity of this contract which, at first sight, seems so commonplace, as well as the void in our ambiguous law are an inexhaustible source of research and exploration, but also the origin of controversial conflicts. With this paper I decided to elaborate I would like to contribute to consolidating the ”status” of national leasing operations, which are still in search of their own identity. Aiming to place the leasing contract back in its rightful place, that of a contract from which nobody has anything to lose but everything to gain, I consider it appropriate to analyse the conditions and effects of the commissoria lex fragments inserted in the leasing contract. One of the most controversial aspect of these last years brought to the attention of the courts of law cases where the financier, once the leasing contract was cancelled, requests the foreclosure of the user. The cancellation we are taking into account is based on the commissoria lex inserted in the clauses of the leasing contract. We have therefore to an alyse whether the foreclosure of the user can be carried on, based on the provisions of GO 51/1997 referring to leasing contracts.

  12. Ca2+ influx insensitive to organic Ca2+ entry blockers contributes to noradrenaline-induced contractions of the isolated guinea pig aorta

    NARCIS (Netherlands)

    Gouw, M. A.; Wilffert, B.; Wermelskirchen, D.; van Zwieten, P. A.

    1990-01-01

    We determined the contribution of intracellular Ca2+ to the noradrenaline (NA, 3 X 10(-5) mmol/l)-induced contraction of the isolated guinea pig aorta. Since only about 55% of the NA-induced contraction could be attributed to intracellular Ca2+ release, we assumed that a Ca2+ influx component

  13. Additive manufacture (3d printing) of plasma diagnostic components and assemblies for fusion experiments

    Science.gov (United States)

    Sieck, Paul; Woodruff, Simon; Stuber, James; Romero-Talamas, Carlos; Rivera, William; You, Setthivoine; Card, Alexander

    2015-11-01

    Additive manufacturing (or 3D printing) is now becoming sufficiently accurate with a large range of materials for use in printing sensors needed universally in fusion energy research. Decreasing production cost and significantly lowering design time of energy subsystems would realize significant cost reduction for standard diagnostics commonly obtained through research grants. There is now a well-established set of plasma diagnostics, but these expensive since they are often highly complex and require customization, sometimes pace the project. Additive manufacturing (3D printing) is developing rapidly, including open source designs. Basic components can be printed for (in some cases) less than 1/100th costs of conventional manufacturing. We have examined the impact that AM can have on plasma diagnostic cost by taking 15 separate diagnostics through an engineering design using Conventional Manufacturing (CM) techniques to determine costs of components and labor costs associated with getting the diagnostic to work as intended. With that information in hand, we set about optimizing the design to exploit the benefits of AM. Work performed under DOE Contract DE-SC0011858.

  14. Study of impacts of physical contracts and financial contracts on bidding strategies of GENCOs

    International Nuclear Information System (INIS)

    Xiaoling Chen; He, Y.; Song, Y.H.

    2004-01-01

    This paper studies the impacts of physical contracts and financial contracts on the bidding strategies of GENCOs, including Physical Bilateral Contracts, Contracts for Difference (CfDs), Call Options and Put Options under discriminatory pricing mechanism. The integrated bidding decision model is applied, which has three main modules - probabilistic local marginal price simulator, market-oriented unit commitment model and multi-criteria decision system. The numerical results show that the GENCO will choose different bidding strategies if it holds different types of contract. The results also suggest that CfDs have the best performance for risk alleviation. (author)

  15. High-current discharge channel contraction in high density gas

    International Nuclear Information System (INIS)

    Rutberg, Ph. G.; Bogomaz, A. A.; Pinchuk, M. E.; Budin, A. V.; Leks, A. G.; Pozubenkov, A. A.

    2011-01-01

    Research results for discharges at current amplitudes of 0.5-1.6 MA and current rise rate of ∼10 10 A/s are presented. The discharge is performed in the hydrogen environment at the initial pressure of 5-35 MPa. Initiation is implemented by a wire explosion. The time length of the first half-period of the discharge current is 70-150 μs. Under such conditions, discharge channel contraction is observed; the contraction is followed by soft x-ray radiation. The phenomena are discussed, which are determined by high density of the gas surrounding the discharge channel. These phenomena are increase of the current critical value, where the channel contraction begins and growth of temperature in the axis region of the channel, where the initial density of the gas increases.

  16. Advice for a career in academic gastroenterology: from fellowship application through job selection and contract negotiations to research and promotion.

    Science.gov (United States)

    Cappell, M S

    2009-03-01

    This study aims to describe a comprehensive strategy for success in academic gastroenterology by reporting common sense, but mostly previously unpublished, recommendations. The recommendation are based on expert opinion from personal experience mentoring 125 gastroenterology fellows and residents as a program director for nine years and from mentoring research while publishing more than 160 articles in peer-reviewed journals and editing 11 books during a 23-year academic career. Primary criteria for fellowship applicant selection include board scores, clinical performance, interview performance, clinical training, and research productivity. For optimal chances, select the subspecialty of gastroenterology early during residency, consult a mentor, and develop a well-planned strategy. Faculty advancement depends upon publications, grants, national recognition, interpersonal skills, and recommendations. Article categories from highest-to-lowest in prestige are original investigations, review articles, book chapters, case reports, and letters/abstracts. Articles are judged by the prestige of the journal of publication. Resubmit rejected articles to successively less prestigious journals until accepted for publication. Articles in journals without peer-review have negligible career impact. Grant support creates protected time. Institutional reputation is important in academics. Do not accept a job without a written contract. Have a lawyer review your contract. An outside offer strengthens a negotiating position. Be sociable and nonconfrontational at work. Network with colleagues. Seek a mentor. Meet your supervisor regularly for feedback. Never express anger at your boss or patients. Avoid litigation with employers. Sub-subspecialize to develop expertise in one area. Focus on this area in your research and clinical practice. In conclusion, a well-planned strategy can help you achieve a senior academic position early and efficiently.

  17. Analysis of foreign petroleum contracts

    International Nuclear Information System (INIS)

    Moran, S.S.

    1991-01-01

    Most foreign exploration and production contracts are of two basic types: Production-Sharing contracts in which a portion of oil revenues, 'cost oil,' is available to the contractor for recoupment of exploration and production costs with the remainder, 'profit oil,' being shared according to an agreed-upon formula, and the familiar Tax-Royalty contract in which a share of petroleum revenues goes to the host country 'off the top' as royalties, and operating profits are taxed at the going rate. Bottom line splits of profits between host governments and contractors, which are approximately 50-50 in the United States, are typically in the 60-40 to 85-15 range elsewhere, with lower profit shares being offset by the higher volume potential and lower costs that may be associated with less mature exploration areas. Foreign contract qualities can be grossly compared by walking typical field models through the contracts to arrive at the bottom line profit splits. Variations within the contract forms include government participation, sliding scale contract elements, special taxes related to rates of return, etc. Often, contract terms are subject to negotiation and the tradeoffs between contract elements must be understood. Contract life, amortization schedules, fund repatriation, currency exchange rates, and the interaction of foreign and United States tax regimens are among the other factors that must be considered. Final decisions on foreign ventures must combine consideration of contracts, economic projections, hydrocarbon volumes, exploration cost estimates, and the estimated probability of success into an overall project assessment

  18. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  19. Can conditional health policies be justified? A policy analysis of the new NHS dental contract reforms.

    Science.gov (United States)

    Laverty, Louise; Harris, Rebecca

    2018-06-01

    Conditional policies, which emphasise personal responsibility, are becoming increasingly common in healthcare. Although used widely internationally, they are relatively new within the UK health system where there have been concerns about whether they can be justified. New NHS dental contracts include the introduction of a conditional component that restricts certain patients from accessing a full range of treatment until they have complied with preventative action. A policy analysis of published documents on the NHS dental contract reforms from 2009 to 2016 was conducted to consider how conditionality is justified and whether its execution is likely to cause distributional effects. Contractualist, paternalistic and mutualist arguments that reflect notions of responsibility and obligation are used as justification within policy. Underlying these arguments is an emphasis on preserving the finite resources of a strained NHS. We argue that the proposed conditional component may differentially affect disadvantaged patients, who do not necessarily have access to the resources needed to meet the behavioural requirements. As such, the conditional component of the NHS dental contract reform has the potential to exacerbate oral health inequalities. Conditional health policies may challenge core NHS principles and, as is the case with any conditional policy, should be carefully considered to ensure they do not exacerbate health inequities. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  20. An unsatisfactory contract policy

    CERN Multimedia

    Association du personnel

    2012-01-01

    For the last 15 years contract policy has been one of the top priorities of CERN staff, as expressed in successive surveys initiated by the Staff Association. In one’s professional life, having some forward vision of one’s career prospects is the key to loyalty and motivation. On the contrary, instability about the future is always at the root of anxiety, conflicts, or even health problems. A good employer must therefore balance the needs of the Company and those of its employees. CERN’s current contract policy, as described in the Administrative Circular No 2, states that staff members should first obtain a limited duration (LD) contract of up to five years. Then, if they want to stay in the Organization, staff members must apply, usually once a year, and before the end of their LD contract, for an indefinite contract (IC) post. All candidates for an IC post are considered by the Review Board for the award of indefinite contracts (Review Board) which will choose the most suita...

  1. Experience with cleaning of sodium-wetted components and decontamination at Nuclear Research Centre Karlsruhe

    Energy Technology Data Exchange (ETDEWEB)

    Menzenhauer, P; Borgstedt, U; Stamm, H H; Dippel, Th; Kunze, S; Hentschel, D [Kernforschungszentrum Karlsruhe, Karlsruhe (Germany)

    1978-08-01

    Within the framework of the Fast Breeder Project various institutes of the KarIsruhe Nuclear Research Center operate sodium loops for corrosion studies and component tests under sodium. The operation of these loops has led to extensive experience in cleaning sodium-wetted components. This experience relates to the alcohol method, the removal of sodium by melting, storage in air, and to cleaning by means of steam. Deposition samples from radioactive sodium loops were used for decontamination experiments employing various decontaminating agents. The department concerned with the treatment of radioactive waste studied the use of molten salts and paste type cleansers for components unsuitable for mechanical decontamination, primarily with the objective to reduce the amount of radioactive waste. (author)

  2. Experience with cleaning of sodium-wetted components and decontamination at Nuclear Research Centre Karlsruhe

    International Nuclear Information System (INIS)

    Menzenhauer, P.; Borgstedt, U.; Stamm, H.H.; Dippel, Th.; Kunze, S.; Hentschel, D.

    1978-01-01

    Within the framework of the Fast Breeder Project various institutes of the KarIsruhe Nuclear Research Center operate sodium loops for corrosion studies and component tests under sodium. The operation of these loops has led to extensive experience in cleaning sodium-wetted components. This experience relates to the alcohol method, the removal of sodium by melting, storage in air, and to cleaning by means of steam. Deposition samples from radioactive sodium loops were used for decontamination experiments employing various decontaminating agents. The department concerned with the treatment of radioactive waste studied the use of molten salts and paste type cleansers for components unsuitable for mechanical decontamination, primarily with the objective to reduce the amount of radioactive waste. (author)

  3. Ontologies for commitment-based smart contracts

    NARCIS (Netherlands)

    de Kruijff, Joost; Weigand, Hans; Panetto, H; Debruyne, C.; Gaaloul, W.; Papazoglou, M.; Paschke, A.; Ardagna, C.A.; Meersman, R.

    2017-01-01

    Smart contracts gain rapid exposure since the inception of blockchain technology. Yet there is no unified ontology for smart contracts. Being categorized as coded contracts or substitutes of conventional legal contracts, there is a need to reduce the conceptual ambiguity of smart contracts. We

  4. 48 CFR 46.314 - Transportation contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  5. Contracting for nuclear fuels

    International Nuclear Information System (INIS)

    Schuessler, C.M.

    1981-10-01

    This paper deals with uranium sales contracts, i.e. with contractual arrangements in the first steps of the fuel cycle, which cover uranium production and conversion. The various types of contract are described and, where appropriate, their underlying business philosophy and their main terms and conditions. Finally, the specific common features of such contracts are reviewed. (NEA) [fr

  6. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  7. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  8. Design of a high-performance rotary stratified-charge research aircraft engine

    Science.gov (United States)

    Jones, C.; Mount, R. E.

    1984-01-01

    The power section for an advanced rotary stratified-charge general aviation engine has been designed under contract to NASA. The single-rotor research engine of 40 cubic-inches displacement (RCI-40), now being procured for test initiation this summer, is targeted for 320 T.O. horse-power in a two-rotor production engine. The research engine is designed for operating on jet-fuel, gasoline or diesel fuel and will be used to explore applicable advanced technologies and to optimize high output performance variables. Design of major components of the engine is described in this paper.

  9. Ca2+influx insensitive to organic Ca2+entry blockers contributes to noradrenaline-induced contractions of the isolated guinea pig aorta

    NARCIS (Netherlands)

    Gouw, M.A.M.; Wilffert, B.; Wermelskirchen, D.; Van Zwieten, P.A.

    1990-01-01

    We determined the contribution of intracellular Ca2+to the noradrenaline (NA, 3 x 10-5mmol/l)-induced contraction of the isolated guinea pig aorta. Since only about 55% of the NA-induced contraction could be attributed to intracellular Ca2+release, we assumed that a Ca2+influx component contributes

  10. 7 CFR 631.14 - Contract violations.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Contracts § 631.14 Contract violations. Contract violations, determinations and appeals will be handled in accordance with the terms of the... 7 Agriculture 6 2010-01-01 2010-01-01 false Contract violations. 631.14 Section 631.14 Agriculture...

  11. 77 FR 3288 - International Mail Contract

    Science.gov (United States)

    2012-01-23

    ... as the baseline contract for future functional equivalence analyses of the GREP Contracts 1 product... Classification Schedule language for GREP Contracts 1. The Postal Service identifies general contract terms that... methodology, the relevant characteristics of this GREP contract are similar, if not the same, as the relevant...

  12. 48 CFR 837.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 837.403... OF CONTRACTING SERVICE CONTRACTING Nonpersonal Health Care Services 837.403 Contract clause. The contracting officer shall insert the clause at 852.237-7, Indemnification and medical liability insurance, in...

  13. 48 CFR 811.503 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.503... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Liquidated Damages 811.503 Contract clause. When the contracting... contracting officer must include the clause in 852.211-74, Liquidated damages, in the contract. ...

  14. Endogenous Market Structures and Contract Theory. Delegation, principal-agent contracts, screening, franchising and tying

    OpenAIRE

    Etro Federico

    2010-01-01

    I study the role of unilateral strategic contracts for firms active in markets with price competition and endogenous entry. Traditional results change substantially when the market structure is endogenous rather than exogenous. They concern 1) contracts of managerial delegation to non-profit maximizers, 2) incentive principal-agent contracts in the presence of moral hazard on cost reducing activities, 3) screening contracts in case of asymmetric information on the productivity of the managers...

  15. BOT Outsourcing Contracts

    DEFF Research Database (Denmark)

    Ørberg Jensen, Peter D.; Petersen, Bent

    2012-01-01

    Build-operate-transfer (BOT) contracting has been widely usen in the engineering and construction industry, but has only recently been introduced in services industry domains. Notably, service provider firms from emerging markets have recently started offering BOT outsourcing contracts. In this p...

  16. Comparing contracting performance

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian

    . Hypotheses are suggested for the role of culture, competition, contracts, capabilities and collaboration for contracting performance between and across the countries. Arguments are tested against data from on four comparable national surveys of private delivery of park and road maintenance services in local...

  17. 48 CFR 926.7104 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 926.7104... 1993. 926.7104 Contract clause. The contracting officer shall insert the clause at 48 CFR (DEAR) 952.226-74, Displaced Employee Hiring Preference, in contracts (except for contracts for commercial items...

  18. 48 CFR 822.305 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 822.305... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act 822.305 Contract clause. The contracting officer shall insert the clause at 852.222-70, Contract Work...

  19. 48 CFR 52.222-51 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-51 Exemption from Application of the Service Contract Act to Contracts for Maintenance... clause: Exemption From Application of the Service Contract Act to Contracts for Maintenance, Calibration...

  20. 48 CFR 52.222-48 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance... following provision: Exemption From Application of the Service Contract Act to Contracts for Maintenance...

  1. Application of Sharī‘ah contracts in contemporary Islamic finance: A maqāṣid perspective

    Directory of Open Access Journals (Sweden)

    Younes Soualhi

    2015-12-01

    Full Text Available This research exposes the underlying maqāṣid embedded in Sharī‘ah contracts as applied in Islamic banking and finance. It addresses the problem of not observing maqāṣid in nominated and combined Sharī‘ah contracts as well as the problem of not sufficiently imbuing maqāṣid in products developed by Islamic financial institutions. As a benchmark of the maqāṣid of wealth, the research adopts Ibn ‘Āshūr’s classification of maqāṣid to evaluate the conformity of Sharī‘ah contracts to Maqāṣid al-Sharī‘ah namely, justice, circulation, transparency, and firmness. The study focuses on three markets related to the application of Sharī‘ah contracts, namely, banking, Islamic capital market, and takāful. The study concludes that, by and large, the application of Sharī‘ah contracts has observed Maqāṣid al-Sharī‘ah during its development and initial application stages of Islamic finance products; however, offering such products in the market has raised economic questions as to their viability and economic values. In addition, the malpractice of some Sharī‘ah contracts has long raised concerns as to the maqāṣid compliance of such products. The research recommends a de-sophistication of Islamic financial engineering to minimise the possibility of convergence with conventional finance. The research also emphasises product differentiation based on less complicated combined Sharī‘ah contracts.

  2. Performance-based contracting for maintaining transportation assets with emphasis on bridges

    Directory of Open Access Journals (Sweden)

    Alsharqawi Mohammed

    2017-01-01

    Full Text Available With a large number of aging transportation infrastructure assets in North America and the growing problem of deterioration across the globe, managing these assets have been the subject of ongoing research. There is an overwhelming amount of maintenance and rehabilitation works to be done and selecting a suitable maintenance, repair or replacement (MRR strategy is one of the most challenging tasks for decision makers. Limited budget and resources are even making the decision making process more challenging. Maintaining infrastructure to the highest possible condition while investing the minimal amount of money has promoted innovative contracting approaches. Transportation agencies have increased private sector involvement through long term performance-based maintenance contracts or what is called Performance-Based Contracting. PBC is a type of contract that pays a contractor based on the results achieved, not on the methods for performing the maintenance work. By looking into the literature, it is observed that agencies are expanding the amount of contracting they do in order to maintain and achieve a better standard of infrastructure facilities. Therefore, the objective of this paper is to study and review performance-based contracting for transportation infrastructure with emphasis on bridge assets.

  3. Compilation of contract research for the Materials Engineering Branch, Division of Engineering: Annual report for FY 1987

    International Nuclear Information System (INIS)

    1988-06-01

    This compilation of annual reports by contractors to the Materials Engineering Branch of the NRC Office of Research concentrates on achievements in safety research for the primary system of commercial light water power reactors, particularly with regard to reactor vessels, primary system piping, steam generators, nondestructive examination of primary components, and in safety research for decommissioning and decontamination, on-site storage, and engineered safety features. This report, covering research conducted during Fiscal Year 1987 is the sixth volume of the series of NUREG-0975, ''Compilation of Contractor Research for the Materials Engineering Branch, Division of Engineering.''

  4. Building America Energy Renovations. A Business Case for Home Performance Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Antonopoulos, C. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sevigny, M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gilbride, T. L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hefty, M. G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-10-01

    This research report gives an overview of the needs and opportunities that exist in the U.S. home performance contracting industry. The report discusses industry trends, market drivers, different business models, and points of entry for existing and new businesses hoping to enter the home performance contracting industry. Case studies of eight companies who successfully entered the industry are provided, including business metrics, start-up costs, and marketing approaches.

  5. Evaluation model based on FAHP for nuclear power project contract performance

    International Nuclear Information System (INIS)

    Liu Bohang; Cheng Jing

    2012-01-01

    Fuzzy Comprehensive Evaluation is a common tool to analyze comprehensive integration. Fuzzy Analytic Hierarchy Process is an improvement for Analytic Hierarchy Process. Firstly the paper pointed out the concept of FAHP, and then used FAHP to setup an evaluation system model for nuclear power project contract performance. Based on this model, all the evaluation factors were assigned to different weightiness. By weighting the score of each factor, output would be the result which could evaluate the contract performance. On the basis of the research, the paper gave the principle of evaluating contract performance of nuclear power suppliers, which can assure the procurement process. (authors)

  6. 24 CFR 891.560 - HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  7. Pacta sunt servanda versus the social role of contracts: the case of Brazilian agriculture contracts

    Directory of Open Access Journals (Sweden)

    Christiane Leles Rezende

    2012-06-01

    Full Text Available This study explores the instability created by contradictory court decisions related with contract breaches. Forward marketing contracts represent an important source of resources to finance Brazilian agriculture, however a large number of contract breaches were observed during a period of marked increase in soy prices. The study analyzed 161 judicial appeal decisions and a survey was carried with 70 farmers. The results show the difference of judges' interpretation and the existence of second order effects. The effects of court decisions were more requirements of guarantees and the reduction in the number of contracts. Those soybean farmers who did not breach their contracts have also been negatively affected by the strategic reactions of trading and processing companies. The concept of "social function of the contract" introduced in Brazilian civil code led to a higher degree of instability in contracts, raising transaction costs and motivating private economic sanctions.

  8. nth roots of normal contractions

    International Nuclear Information System (INIS)

    Duggal, B.P.

    1992-07-01

    Given a complex separable Hilbert space H and a contraction A on H such that A n , n≥2 some integer, is normal it is shown that if the defect operator D A = (1 - A * A) 1/2 is of the Hilbert-Schmidt class, then A is similar to a normal contraction, either A or A 2 is normal, and if A 2 is normal (but A is not) then there is a normal contraction N and a positive definite contraction P of trace class such that parallel to A - N parallel to 1 = 1/2 parallel to P + P parallel to 1 (where parallel to · parallel to 1 denotes the trace norm). If T is a compact contraction such that its characteristics function admits a scalar factor, if T = A n for some integer n≥2 and contraction A with simple eigen-values, and if both T and A satisfy a ''reductive property'', then A is a compact normal contraction. (author). 16 refs

  9. Co-ordinated research activities: Annual report and statistics for 2003

    International Nuclear Information System (INIS)

    2004-07-01

    Energy Development; Nuclear Science; Food and Agriculture; Human Health; Water Resources; Protection of the Marine and Terrestrial Environments; Physical and Chemical Applications; Safety of Nuclear Installations; Radiation Safety (including Transport Safety); Management of Radioactive Waste; Safeguards; Security of Material. Results of research are available to all Member States, and are disseminated through national, international and Agency scientific and technical publications (TECDOCs). In certain cases the research results are directly relevant to implementation of projects in the Agency's Technical Co-operation Programme. In terms of benefits to Member States through their participating research institutions, number of awards and degree of funding, co-ordinated research activities constitute a significant component of the Agency's overall programme. 883 contracts and agreements were awarded from the 1242 contract and agreement proposals received by the Agency during 2003. Annex I lists by country the number of proposals received and awards made. In 2003, $6 675 465 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Co-ordination Meetings (RCMs). Additionally, $325 546 of extra-budgetary contributions were used to fund additional contracts and RCMs. Thus, total awards amounted to $7 001 011. Table 1 summarizes all awards by Programme in 2003. The average award per contract rose to $6 400, which represents a 12% increase over the 2002 average award level

  10. Co-ordinated research activities: Annual report and statistics for 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-15

    Energy Development; Nuclear Science; Food and Agriculture; Human Health; Water Resources; Protection of the Marine and Terrestrial Environments; Physical and Chemical Applications; Safety of Nuclear Installations; Radiation Safety (including Transport Safety); Management of Radioactive Waste; Safeguards; Security of Material. Results of research are available to all Member States, and are disseminated through national, international and Agency scientific and technical publications (TECDOCs). In certain cases the research results are directly relevant to implementation of projects in the Agency's Technical Co-operation Programme. In terms of benefits to Member States through their participating research institutions, number of awards and degree of funding, co-ordinated research activities constitute a significant component of the Agency's overall programme. 883 contracts and agreements were awarded from the 1242 contract and agreement proposals received by the Agency during 2003. Annex I lists by country the number of proposals received and awards made. In 2003, $6 675 465 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Co-ordination Meetings (RCMs). Additionally, $325 546 of extra-budgetary contributions were used to fund additional contracts and RCMs. Thus, total awards amounted to $7 001 011. Table 1 summarizes all awards by Programme in 2003. The average award per contract rose to $6 400, which represents a 12% increase over the 2002 average award level.

  11. 48 CFR 52.222-52 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Certification. 52.222-52 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Certification. As... Contract Act to Contracts for Certain Services—Certification (NOV 2007) (a) The offeror shall check the...

  12. 48 CFR 52.222-53 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Requirements. 52.222-53 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Requirements. As... Act to Contracts for Certain Services—Requirements (FEB 2009) (a) The services under this contract are...

  13. Report on results of contract research. 'Research on MHD generation system'; MHD hatsuden system no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    'Research on MHD generation system' was implemented by its expert committee in the electric joint study group, with the results of fiscal 1981 reported. This year, technological reexamination was conducted for a 2,000 MWt commercial MHD generation plant, with evaluation carried out on the cost performance including the construction and operation cost. In addition, for the purpose of intermediate R and D towards the practicability, examination was also conducted on a system structure, concrete specifications of component element, cost of R and D including operation expenses for example, concerning an 100 MWt class experimental plant and a 500 MWt class plant. In the investigation of the overseas trend, information was summarized in detail on the experimental devices, combustors, generation channels, electrode materials, electrode phenomena, theoretical analyses, seeds, slag, component equipment, instrumental technologies, conceptual designs of generation plant, commercial plant, etc., in Soviet Union, China, Holland, India and EPRI, on the basis of the materials from the 19th MHD symposium held in UTSI and from the coal MHD specialist conference held in Sydney. (NEDO)

  14. Bottlenecks and contracts

    International Nuclear Information System (INIS)

    2001-01-01

    The report surveys the central points in the literature about contracts on geographical price differences and transmission rights in the power market. It is commonly believed that such contracts may reduce market power and contribute to better network investments. The theoretical debate is in part unfinished and largely based on very stylised assumptions. There is some indication that such contracts may not be very useful in practice. But they may be useful in some cases, perhaps in particular when power is transported outside limited surplus areas and for certain investment decisions where there is no systems operator with a natural responsibility

  15. Greening Public Buildings: ESCO-Contracting in Danish Municipalities

    DEFF Research Database (Denmark)

    Jensen, Jesper Ole; Nielsen, Susanne Balslev; Rohr Hansen, Jesper

    2013-01-01

    This paper presents current research on Danish municipalities’ use of Energy Service Companies (ESCO) as a way to improve the standard of public buildings and to increase energy efficiency. In recent years more and more municipalities have used ESCO-contracts to retrofit existing public buildings...

  16. [The contracting process and outsourcing in health: the scenario for dispute between public and private interests].

    Science.gov (United States)

    Albuquerque, Maria do Socorro Veloso; Morais, Heloísa Maria Mendonça de; Lima, Luci Praciano

    2015-06-01

    This research analyzed the public-private composition in the municipal health network and aspects of the contracting/outsourcing process for services over the period from 2001 to 2008. The research method used was a case study with documentary research and interviews. The interviewees were former secretaries of health, directors of regulation and district managers. The categories of analysis used were public funds, care networks and public control. The results showed that the contracting was restricted to philanthropic units. With respect to the other private establishments linked to the public care network, non-compliance with programmatic aspects was detected, such as the lack of regulation of bidding processes required for contracting. Management authorities did not actively pursue building up state public services, or the formation of care networks. The contracted establishments conducted their activities without effective external and internal control mechanisms, which are paramount for the proper use of public resources. The authors conclude that the contracting process does not significantly alter the standard of buying and selling of services and indeed does not enhance the empowering process of the role of the public domain.

  17. Coordinating contracts in SCM : a review of methods and literature

    NARCIS (Netherlands)

    Hezarkhani, B.; Kubiak, W.

    2010-01-01

    Supply chain coordination through contracts has been a burgeoning area of research in recent years. In spite of rapid development of research, there are only a few structured analyses of assumptions, methods, and applicability of insights in this field. The aim of this paper is to provide a

  18. Quantification of contraction synchronicity and contraction work in coronary artery disease

    Energy Technology Data Exchange (ETDEWEB)

    Niimi, Takanaga; Nanasato, Mamoru [Nagoya Daini Red Cross Hospital, Nagoya (Japan); Maeda, Hisatoshi [Dept. of Radiological Technology, Nagoya University School of Health Sciences, Nagoya(Japan)

    2017-09-15

    This study quantified the contraction synchronicity (CS; with 100% representing full synchrony and −100% dyssynchrony) and contraction work (CW, millijoules per centimeter squared; representing myocardial area) in patients with reduced left ventricular ejection fraction (LVEF) associated with coronary artery disease (CAD)

  19. Progressive recruitment of muscle fibers is not necessary for the slow component of VO2 kinetics.

    Science.gov (United States)

    Zoladz, Jerzy A; Gladden, L Bruce; Hogan, Michael C; Nieckarz, Zenon; Grassi, Bruno

    2008-08-01

    The "slow component" of O2 uptake (VO2) kinetics during constant-load heavy-intensity exercise is traditionally thought to derive from a progressive recruitment of muscle fibers. In this study, which represents a reanalysis of data taken from a previous study by our group (Grassi B, Hogan MC, Greenhaff PL, Hamann JJ, Kelley KM, Aschenbach WG, Constantin-Teodosiu D, Gladden LB. J Physiol 538: 195-207, 2002) we evaluated the presence of a slow component-like response in the isolated dog gastrocnemius in situ (n=6) during 4 min of contractions at approximately 60-70% of peak VO2. In this preparation all muscle fibers are maximally activated by electrical stimulation from the beginning of the contraction period, and no progressive recruitment of fibers is possible. Muscle VO2 was calculated as blood flow multiplied by arteriovenous O2 content difference. The muscle fatigued (force decreased by approximately 20-25%) during contractions. Kinetics of adjustment were evaluated for 1) VO2, uncorrected for force development; 2) VO2 normalized for peak force; 3) VO2 normalized for force-time integral. A slow component-like response, described in only one muscle out of six when uncorrected VO2 was considered, was observed in all muscles when VO2/peak force and VO2/force-time were considered. The amplitude of the slow component-like response, expressed as a fraction of the total response, was higher for VO2/peak force (0.18+/-0.06, means+/-SE) and for VO2/force-time (0.22+/-0.05) compared with uncorrected VO2 (0.04+/-0.04). A progressive recruitment of muscle fibers may not be necessary for the development of the slow component of VO2 kinetics, which may be caused by the metabolic factors that induce muscle fatigue and, as a consequence, reduce the efficiency of muscle contractions.

  20. Influence of Personality on Perception of Psychological Contract Breach

    Directory of Open Access Journals (Sweden)

    Hassan Jafri

    2014-10-01

    Full Text Available The present research aimed to investigate the influence of personality (Five-Factor Model on Psychological Contract Breach. Using random sampling procedure, data were collected from 90 faculties of colleges of Royal University of Bhutan. Personality scales by John, Naumann, and Soto (2008 and Robinson and Morrison’s (2000 Psychological Contract Breach scale were used in this study. Correlation and regression analysis were carried out to analyze the obtained data. Results revealed that Extraversion and Neuroticism dimensions of the personality model have been found to be positively associated with the perception of breach. Employees who are by nature Agreeable and Conscientiousness are less likely to perceive breach in their psychological contract. Organization should look into the personality aspect while recruiting employees. If employees are hired with certain personality traits, they may focus on their performance and organizational growth.

  1. Optimal Contracting under Adverse Selection

    DEFF Research Database (Denmark)

    Lenells, Jonatan; Stea, Diego; Foss, Nicolai Juul

    2015-01-01

    We study a model of adverse selection, hard and soft information, and mentalizing ability--the human capacity to represent others' intentions, knowledge, and beliefs. By allowing for a continuous range of different information types, as well as for different means of acquiring information, we dev...... of that information. This strategy affects the properties of the optimal contract, which grows closer to the first best. This research provides insights into the implications of mentalizing for agency theory....

  2. Effect of Contract Research Organization Bureaucracy in Clinical Trial Management: A Model From Lung Cancer.

    Science.gov (United States)

    Gobbini, Elisa; Pilotto, Sara; Pasello, Giulia; Polo, Valentina; Di Maio, Massimo; Arizio, Francesca; Galetta, Domenico; Petrillo, Patrizia; Chiari, Rita; Matocci, Roberta; Di Costanzo, Alessandro; Di Stefano, Teresa Severina; Aglietta, Massimo; Cagnazzo, Celeste; Sperduti, Isabella; Bria, Emilio; Novello, Silvia

    2018-03-01

    Contract research organization (CRO) support is largely included in clinical trial management, although its effect in terms of time savings and benefit has not yet been quantified. We performed a retrospective multicenter analysis of lung cancer trials to explore differences in term of trial activation timelines and accrual for studies with and without CRO involvement. Results regarding study timelines from feasibility data to first patient enrollment were collected from 7 Italian thoracic oncology departments. The final accruals (screened/enrolled patients) are reported. We considered CRO/sponsor-administered and CRO-free trials according to who was responsible for the management of the crucial setup phases. Of 113 trials, 62 (54.9%) were CRO-administered, 34 (30.1%) were sponsor-administered, and 17 (15.0%) were CRO-free. The median time from feasibility invitation to documentation obtainment was 151 days in the CRO-administered trials versus 128 in the sponsor-administered and 120 in the CRO-free trials. The time from document submission to contract signature was 142 days in the CRO-administered versus 128 in the sponsor-administered and 132 in the CRO-free trials. The time from global accrual opening to first patient enrollment was 247 days for the CRO-administered versus 194 in the sponsor-administered and 151 in the CRO-free trials. No significant differences were observed in terms of the median overall timeline: 21 months in the CRO-administered, 15 in the sponsor-administered, and 18 months in the CRO-free studies (P = .29). Although no statistically significant differences were identified, the results of our analysis support the idea that bureaucratic procedures might require more time in CRO-administered trials than in sponsor-administered and CRO-free studies. This bureaucratic delay could negatively affect Italian patients' screening and enrollment compared with other countries. Copyright © 2017 Elsevier Inc. All rights reserved.

  3. Temporary labour contracts

    CERN Document Server

    2001-01-01

    At its September 2000 meeting, the Finance Committee approved a second one-year extension of the four existing temporary labour contracts (L020/PE, L021/PE, L022/PE, L023/PE) until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices. The Finance Committee is invited: - to take note that the estimated annual expenditure on temporary labour in 2001 will amount to approximately 4 500 000 Swiss francs against the previously estimated 6 000 000 Swiss francs; - to approve the extension of the four existing contracts by six months to 30 June 2002 for an overall amount not exceeding 1 500 000 Swiss francs; - to take note that new contracts for the Swiss part of the CERN site will be submitted for adjudication in December 2001 and that new contracts for the French part of the CERN site will be submitted for adjudication in the course of 2002.

  4. Temporary labour contracts

    CERN Document Server

    1999-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L021/PE, L022/PE, L023/PE and L024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) will reach the end of their initial three-year contractual period at the end of December 1999. Following the satisfactory execution of these contracts during this period, CERN requests approval to extend them from January 2000 for the first of the two years foreseen in the original adjudication. The Finance Committee is invited: - to take note that the three-year expenditure for Temporary Labour contracts from 1997 to 1999 will not exceed 19 100 000 Swiss francs, compared to the 18 900 000 Swiss francs estimated at the time of the adjudication in March 1996; - to approve an extension of the present Temporary Labour contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs.

  5. Designing Research Services: Cross-Disciplinary Administration and the Research Lifecycle

    Science.gov (United States)

    Madden, G.

    2017-12-01

    The sheer number of technical and administrative offices involved in the research lifecycle, and the lack of shared governance and shared processes across those offices, creates challenges to the successful preservation of research outputs. Universities need a more integrated approach to the research lifecycle that allows us to: recognize a research project as it is being initiated; identify the data associated with the research project; document and track any compliance, security, access, and publication requirements associated with the research and its data; follow the research and its associated components across the research lifecycle; and finally recognize that the research has come to a close so we can trigger the various preservation, access, and communications processes that close the loop, inform the public, and promote the continued progress of science. Such an approach will require cooperation, communications, and shared workflow tools that tie together (often across many years) PIs, research design methodologists, grants offices, contract negotiators, central research administrators, research compliance specialists, desktop IT support units, server administrators, high performance computing facilities, data centers, specialized data transfer networks, institutional research repositories, institutional data repositories, and research communications groups, all of which play a significant role in the technical or administrative success of research. This session will focus on progress towards improving cross-disciplinary administrative and technical cooperation at Penn State University, with an emphasis on generalizable approaches that can be adopted elsewhere.

  6. Measuring compliance during aircraft (Component) redeliveries at KLM engineering & maintenance

    NARCIS (Netherlands)

    Burhani, Shahir; Verhagen, W.J.C.; Curran, Ricky

    2016-01-01

    Aircraft and aircraft components are redelivered to the next operator or owner during the phase-out process. During this process the operator is required by law and contract requirements to show compliance with maintenance procedures. At KLM E&M the phase-out documentation process is under

  7. JURIDICAL WILL IN CONTRACTS

    Directory of Open Access Journals (Sweden)

    Emilian CIONGARU

    2015-07-01

    Full Text Available In the business law, almost all judicial relationships of private law are obligational juridical relationships which are made up of legal acts and facts. The most important legal act is the contract since it is the basis of the social life in any community meaning that it represents the most important economic and juridical instrument for the participants to a contract. The persons are free and equal in society and, consequently, no power is valid and fundamental unless it relies on their consent, namely on a contract. So, the existence of a civil contract relies on the principles of consensualism, a perception based on moral rules to observe one’s promises, to have good faith and to observe the interests of your fellow creature. The exterior manifestation, the expression or declaration of the juridical will constitutes the consent of such person in making the structure of contract. The declared will must correspond to the person’s real will and the adoption and declaration of the juridical will must take place consciously. Any contract that does not derive from juridical will is null and the civilizing character is inexistent. The principles giving sense to consensualism is the one of agreement between parties so as to produce legal effects by itself and it is enough for the conclusion of a contract, regardless of the form in which it is exteriorized, a principle expressed by the Latin adagio pacta sunt servanda.

  8. Whither Performance Contracting?

    Science.gov (United States)

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  9. Democratic contract law

    NARCIS (Netherlands)

    Hesselink, M.W.

    2015-01-01

    This article discusses the normative relationship between contract law and democracy. In particular, it argues that in order to be legitimate contract law needs to have a democratic basis. Private law is not different in this respect from public law. Thus, the first claim made in this article will

  10. Nursing research. Components of a clinical research study.

    Science.gov (United States)

    Bargagliotti, L A

    1988-09-01

    Nursing research is the systematic collection and analysis of data about clinically important phenomena. While there are norms for conducting research and rules for using certain research procedures, the reader must always filter the research report against his or her nursing knowledge. The most common questions a reader should ask are "Does it make sense? Can I think of any other reasonable explanation for the findings? Do the findings fit what I have observed?" If the answers are reasonable, research findings from carefully conducted studies can provide a basis for making nursing decisions. One of the earliest accounts of nursing research, which indicates the power of making systematic observations, was Florence Nightingale's study. It compared deaths among soldiers in the Crimean War with deaths of soldiers in the barracks of London. Her research demonstrated that soldiers in the barracks had a much higher death rate than did the soldiers at war. On the basis of the study, sanitary conditions in the barracks were changed substantially.

  11. 48 CFR 916.504 - Indefinite-quantity contracts.

    Science.gov (United States)

    2010-10-01

    ... indefinite-quantity, multiple award contracts to ensure that adequate consideration exists to contractually... contracts. 916.504 Section 916.504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Indefinite-Delivery Contracts 916.504 Indefinite-quantity...

  12. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  13. INDEFINITE CONTRACT REVIEW 2000

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen:1.\tCandidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2.\tThe criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following:staff members who are in their fourth year of service on a fixed-term contract;in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consid...

  14. INDEFINITE CONTRACT REVIEW 2001

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen: 1. Candidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2. The criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following: staff members who are in their fourth year of service on a fixed-term contract; in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consideration fo...

  15. Freedom of contract, mandatory and non-mandatory law in European contract law

    OpenAIRE

    Storme, M.

    2008-01-01

    Abstract: The purpose of this article is to reflect on the position and function of common European rules in respect of limitations to freedom of contract, and more specifically on the role of mandatory and non-mandatory rules in general. After dealing with this more generally in the first part, the article addresses in its second part the different techniques restricting freedom of contract that we find in the Principles of European Contract Law,(1) the acquis communautaire of the law of the...

  16. Contract Research, Curricular Reform, and Situated Selves: Between Social Justice and Commercialized Knowledge

    Science.gov (United States)

    Sturges, Keith M.

    2014-01-01

    Using a critical ethnographic perspective, I describe how social scientists actively transition into the evaluation industry in a reform environment that is marked by increased privatization of all aspects of public education. I do this by exploring adaptations that contract evaluators use to enhance a sense of personal connection to their work…

  17. Compositional specification of commercial contracts

    DEFF Research Database (Denmark)

    Andersen, Jesper; Elsborg, Ebbe; Henglein, Fritz

    2006-01-01

    -definable analysis of their state before, during and after execution. We provide several realistic examples of commercial contracts and their analyses. A variety of (real) contracts can be expressed in such a fashion as to support their integration, management and analysis in an operational environment......We present a declarative language for compositional specification of contracts governing the exchange of resources. It extends Eber and Peyton Jones’s declarative language for specifying financial contracts (Jones et al. in The Fun of Programming. 2003) to the exchange of money, goods and services...... amongst multiple parties and complements McCarthy’s Resources, Events and Agents (REA) accounting model (McCarthy in Account Rev. LVII(3), 554–578, 1982) with a view- independent formal contract model that supports definition of user-defined contracts, automatic monitoring under execution and user...

  18. 48 CFR 32.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.114 Unusual contract financing. Any contract financing arrangement that deviates from this part is unusual contract financing...

  19. Analysis of Developed Country's Export Contract and Contract Risk and Development of Sample Contract and Guide

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Chung, W. S.; Lee, K. S.; Yun, S. W.; Lee, J. H.; Lee, B. W.; Kim, H. J.; Yang, M. H.

    2008-10-01

    This paper aimed at developing legal support for the non nuclear power plant industry's export. This study aids establishing government policy and promoting export of non nuclear power plant industry. This paper treated analysis of contractual risk and caution before entering into contract. To promote continuing export result, governmental and legal aids and guide will be required continuously. This study showed risks related with export contract and explained export control acts and procedures

  20. Duplicate Recording of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    ... in more than one of the system's data bases. We also evaluated whether the Mechanization of Contract Administration Services system had adequate controls to detect and prevent duplicate contract payments, and whether database errors...

  1. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  2. The distribution contracts: an Iberian approach

    Directory of Open Access Journals (Sweden)

    Sónia de Carvalho

    2016-12-01

    Full Text Available The contracts of commercial distribution are indispensable legal instruments to the development of the economic activity. The distribution, since the industrial revolution, acquired autonomy, given the necessity of specialized intermediation to distribute good and products. In this process, the structural organization of the distribution process suffered mutations, starting to assume a set of activities aiming at adjusting demand to supply, including, among others, clients canvassing, after-sales services, financing and assumption of risks, advisory services, promotion and advertising. The insufficiency of traditional contracts of purchase and sales and commission to satisfy the distributive needs caused by the industrial revolution will justify the development of new contractual schemes, such us agency contract, commercial concession and franchising. The obligation of the distributer to ensure the interests of the producer and to promote the distribution of the goods and services of the producer, in the context of a lasting relation of cooperation between the parts, through which the distributer is incorporated, with greater or minor intensity, in the producer distribution network, allowed us to sustain, as affirmed in the Portuguese and European literature, that distribution contracts could be framed in the same legal category. These contracts, as contracts that were shaped by praxis, do not have, with exception of agency contract, a legal framework in Portugal and Spain. It has been discussed in literature if agency contract legal framework can be applied, by analogy, to the contracts that fit in the legal category of distribution contracts. This paper aims at analyzing the legal framework of contracts of distribution in these legal systems, with the purpose to discuss the analogical application of the agency contract to these contracts.

  3. Conscientiousness and reactions to psychological contract breach: a longitudinal field study.

    Science.gov (United States)

    Orvis, Karin A; Dudley, Nicole M; Cortina, Jose M

    2008-09-01

    The authors examined the role of employee conscientiousness as a moderator of the relationships between psychological contract breach and employee behavioral and attitudinal reactions to the breach. They collected data from 106 newly hired employees within the 1st month of employment (Time 1), 3 months later (Time 2), and 8 months after Time 1 (Time 3) to observe the progression through contract development, breach, and reaction. Results suggest that conscientiousness is a significant moderator for 4 of the 5 contract breach-employee reaction relationships examined (turnover intentions, organizational loyalty, job satisfaction, and 1 of 2 facets of job performance). Specifically, employees who were lower in conscientiousness had more negative reactions to perceived breach with respect to turnover intentions, organizational loyalty, and job satisfaction. In contrast, employees who were higher in conscientiousness reduced their job performance to a greater degree in response to contract breach. Future research directions are discussed.

  4. A trace-based model for multiparty contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom; Klaedtke, Felix; Zălinescu, Eugen

    2012-01-01

    In this article we present a model for multiparty contracts in which contract conformance is defned abstractly as a property on traces. A key feature of our model is blame assignment, which means that for a given contract, every breach is attributed to a set of parties. We show that blame...... assignment is compositional by de¿ning contract conjunction and contract disjunction. Moreover, to specify real-world contracts, we introduce the contract speci¿cation language CSL with an operational semantics. We show that each CSL contract has a counterpart in our trace-based model and from...... the operational semantics we derive a run-time monitor. CSL overcomes limitations of previously proposed formalisms for specifying contracts by supporting: (history sensitive and conditional) commitments, parametrised contract templates, relative and absolute temporal constraints, potentially in¿nite contracts...

  5. 75 FR 18034 - Defense Federal Acquisition Regulation Supplement; Research and Development Contract Type...

    Science.gov (United States)

    2010-04-08

    ... Budget under 44 U.S.C. 3501, et seq. List of Subjects in 48 CFR Parts 234 and 235 Government procurement...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule that requires the Milestone Decision Authority (MDA) for a major defense acquisition program (MDAP) to select the contract...

  6. Organisational change and the psychological contract at a pharmaceutical company

    Directory of Open Access Journals (Sweden)

    Kelebogile D. Magano

    2017-09-01

    Full Text Available Orientation: Over a period of 6 years, a South African pharmaceutical company had been involved in several mergers and acquisitions. These changes had proved difficult for staff and staff attrition had risen. Research purpose: The objective of the study was to explore the perceptions of senior managers about the impact of change on the psychological contract. The sub-objectives were to determine what organisational factors contribute to changes in the psychological contract during periods of change, and the implications of the breach of the psychological contract for the company and its employees. Motivation for the study: As the company was set to embark on further mergers and acquisitions, the opinions of senior managers about how such changes should be addressed are important for the company. Research design, approach and method: A case study approach was used in this qualitative study. The population comprised 60 senior managers of whom 12 were purposefully selected for inclusion in the study. A semistructured interview schedule was used to capture the views of these managers and themes were extracted by means of content analysis. Main findings: Seven themes emerged which encapsulated the perceptions of senior managers about the impact of change on the psychological contract during periods of mergers and acquisitions – lack of communication, an absence of planning, lack of employee engagement, less than optimal human resources involvement, lack of preparation of the organisational culture and poor change management processes. These factors need to be addressed to strengthen the psychological contract of employees during periods of change. Practical/managerial implications: The study highlighted areas that leaders and managers of the company should consider when embarking on mergers and acquisitions if the psychological contract of employees is not to be negatively impacted. Contribution: While caution must be exercised in the

  7. 48 CFR 916.203-4 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.203-4 Section 916.203-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 916.203-4 Contract clauses. (d)(2) The...

  8. 48 CFR 232.501-3 - Contract price.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract price. 232.501-3... 232.501-3 Contract price. (b) The contracting officer may approve progress payments when the contract price exceeds the funds obligated under the contract, provided the contract limits the Government's...

  9. Copyright Preemption of Contracts

    OpenAIRE

    Bohannan, Christina

    2008-01-01

    This Article argues that both courts and scholars are wrong in their categorical approaches to preemption of contracts under the Copyright Act, and proposes an intermediate approach that recognizes the importance of both contract rights and federal policy in preemption analysis. First, it argues that both courts and scholars have misapplied preemption law to breach of contract claims. Although the two sides tend to favor opposite results, they take equally categorical approaches. Categori...

  10. 48 CFR 39.107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer...

  11. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  12. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  13. 48 CFR 871.212 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 871.212... Rehabilitation and Employment Service 871.212 Contract clauses. Contracting officers must use the following clauses, as appropriate, in solicitations and contracts for vocational rehabilitation and employment...

  14. Evaluation of the Defense Contract Audit Agency Audit Coverage of Tricare Contracts

    National Research Council Canada - National Science Library

    Brannin, Patricia

    2000-01-01

    Our objective was to evaluate the adequacy of the Defense Contract Audit Agency (DCAA) audit coverage of contracts for health care provided under TRICARE and the former Civilian Health Care and Medical Program of the Uniformed Services...

  15. 29 CFR 4.145 - Extended term contracts.

    Science.gov (United States)

    2010-07-01

    ...'Hara Service Contract Act Changes in Contract Coverage § 4.145 Extended term contracts. (a) Sometimes... purposes of this Act, a contract shall be deemed entered into upon the contract anniversary date which... period is a wholly new contract with respect to application of the Act's provisions and the regulations...

  16. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  17. The impact of psychological contract on organisational commitment: A study on public sector of Maldives

    Directory of Open Access Journals (Sweden)

    Zubair Hassan

    2017-10-01

    Full Text Available The purpose of this study is to investigate the impact to psychological contract on the organisational commitment of public sector employees in Maldives. The research draws a sample of 100 respondents from ministry of Youth and Sports, Maldives, using simple random probability sampling technique. A Likert-Scale with 1-5 rating was used to obtain. The Questionnaire distributed included five variables to measure the Psychological Contract construct. These are ‘trust, ‘mutual obligation’, ‘perceived fairness, and ‘length of contract’. The dependent variable was organizational commitment (affective commitment, which is measured using ‘sense of belonging to the organization’, pride in organization membership’, and meaning associated with the work’. The data collected was processed using the Statistical Package for Social Science (SPSS version 22.0 for windows. The correlation analysis shows that the dimensions of psychological contract have positive correlation with affective commitment. The main results indicate that psychological contract dimension such as fulfillment of mutual obligations, perceived fairness and length of contract has a positive and significant impact on affective commitment. However this study found that psychological contract dimension, trust in employer has a positive correlation although it does not have a significant impact on affective commitment. Implications and suggestion for future researches are discussed.

  18. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  19. 48 CFR 846.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 846.710 Section 846.710 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710 Contract clauses. The contracting officer shall insert the clause at...

  20. 48 CFR 833.215 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 833.215 Section 833.215 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 833.215 Contract clause. The contracting...

  1. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  2. 48 CFR 432.412 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 432.412 Section 432.412 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 432.412 Contract clause. The decision...

  3. Transnational Law of Public Contracts

    NARCIS (Netherlands)

    Audit, M.; Schill, S.W.

    2016-01-01

    Public contracts were traditionally conceived as instruments of domestic public law and used within markets confined to the territory of the state party to the contract. Globalization, however, subjects public contracting to an increasing number of processes that take place at a transnational level

  4. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schoene, Thomas

    2014-01-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  5. The effects of aging on electrical and I ampersand C components: Results of US Nuclear Plant Aging Research

    International Nuclear Information System (INIS)

    Aggarwal, S.K.; Gunther, W.E.

    1993-01-01

    The US NRC's hardware oriented engineering research program for plant aging and degradation monitoring has achieved results in the area of electrical, control, and instrumentation (ECI) components used in nuclear power plants (NPPs). The principal goals of the program, known as the Nuclear Power Plant Aging Research (NPAR) Program, are to understand the effects of age-related degradation in NPPs and how to manage and mitigate them effectively. This paper describes how these goals have been achieved for key ECI components used in the safety systems of NPPs. The status of relevant on-going and planned research projects is also provided

  6. The effects of aging on electrical and I ampersand C components: Results of US nuclear plant aging research

    International Nuclear Information System (INIS)

    Aggarwal, S.K.; Gunther, W.E.

    1991-01-01

    The US NRC's hardware oriented engineering research program for plant aging and degradation monitoring has achieved results in the area of electrical, control, and instrumentation (ECI) components used in nuclear power plants (NPPs). The principal goals of the program, known as the Nuclear Power Plant Aging Research (NPAR) Program, are to understand the effects of age-related degradation in NPPs and how to manage and mitigate them effectively. This paper describes how these goals have been achieved for key ECI components used in the safety systems of NPPs. The status of relevant on-going and planned research projects is also provided

  7. The interpretation of administrative contracts

    Directory of Open Access Journals (Sweden)

    Cătălin-Silviu SĂRARU

    2014-06-01

    Full Text Available The article analyzes the principles of interpretation for administrative contracts, in French law and in Romanian law. In the article are highlighted derogations from the rules of contract interpretation in common law. Are examined the exceptions to the principle of good faith, the principle of common intention (willingness of the parties, the principle of good administration, the principle of extensive interpretation of the administrative contract. The article highlights the importance and role of the interpretation in administrative contracts.

  8. Contract types for nuclear power projects, non-turnkey type contracts in particular

    International Nuclear Information System (INIS)

    Nyte'n, T.

    1975-01-01

    A non-turnkey contract differs from a turnkey contract in no special formal way. The way the buyer chooses to exercise his project leadership must be concretized in the contract. The way and extent he wishes to exercise technical checking must be laid down in the form of clear rules. The way information has to flow from one contractor over buyer to others and vice versa has to be laid down in detail and the consequences of non conformance fixed in such a manner that optimum project performance is reached. (orig./FW) [de

  9. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  10. 48 CFR 904.7201 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 904.7201... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  11. How Can We Best Achieve Contracting Unity of Effort in the CENTCOM Area of Responsibility?

    OpenAIRE

    Torres, Isaac; Ross, Marvin

    2013-01-01

    Approved for public release; distribution is unlimited. The purpose of this research is to investigate how to better achieve contracting unity of effort in the U.S. Central Command area of operations and the implications for other combatant commands in similar contingency situations. In the U.S. Central Command area of operations, numerous contracting agencies operate in Afghanistan, each with its own contract authority, but these agencies have little synchronization and no common operatin...

  12. Research on the mechanical behaviour of an airplane component made by selective laser melting technology

    Directory of Open Access Journals (Sweden)

    Păcurar Răzvan

    2017-01-01

    Full Text Available The main objective of the presented research consists in the redesign of an airplane component to decrease its weight, without affecting the mechanical behaviour of the component, at the end. Femap NX Nastran and ANSYS FEA programs were used for the shape optimization and for the estimation of the mechanical behaviour of a fixing clamp that was used to sustain the hydraulic pipes that are passing through an airplane fuselage, taking into consideration two types of raw materials – Ti6Al4V and AlSi12 powder from which this component could be manufactured by using the selective laser melting (SLM technology. Based on the obtained results, the airplane component was finally manufactured from titanium alloy using the SLM 250 HL equipment that is available at SLM Solutions GmbH company from Luebeck, in Germany.

  13. Increased muscle glucose uptake during contractions

    DEFF Research Database (Denmark)

    Ploug, Thorkil; Galbo, Henrik; Richter, Erik

    1984-01-01

    We reinvestigated the prevailing concept that muscle contractions only elicit increased muscle glucose uptake in the presence of a so-called "permissive" concentration of insulin (Berger et al., Biochem. J. 146: 231-238, 1975; Vranic and Berger, Diabetes 28: 147-163, 1979). Hindquarters from rats...... in severe ketoacidosis were perfused with a perfusate containing insulin antiserum. After 60 min perfusion, electrical stimulation increased glucose uptake of the contracting muscles fivefold. Also, subsequent contractions increased glucose uptake in hindquarters from nondiabetic rats perfused for 1.5 h......-methylglucose uptake increased during contractions and glucose uptake was negative at rest and zero during contractions. An increase in muscle transport and uptake of glucose during contractions does not require the presence of insulin. Furthermore, glucose transport in contracting muscle may only increase if glycogen...

  14. 48 CFR 803.7001 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 803.7001... Practices 803.7001 Contract clause. The contracting officer shall insert the clause at 852.203-71, Display of Department of Veterans Affairs Hotline poster, in solicitations and contracts expected to equal or...

  15. 48 CFR 819.7009 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 819.7009... Acquisition Program 819.7009 Contract clauses. The contracting officer shall insert VAAR clause 852.219-10... Veteran-Owned Small Business Set-Aside in solicitations and contracts for acquisitions under this subpart. ...

  16. 48 CFR 903.971 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 903.971... Contract clause. The contracting officer shall insert the clause at 952.203-70, Whistleblower Protection for Contractor Employees, in contracts that involve work to be done on behalf of DOE directly related...

  17. 48 CFR 53.111 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract clause. 53.111... AND FORMS FORMS General 53.111 Contract clause. Contracting officers shall insert the clause at 52.253-1, Computer Generated Forms, in solicitations and contracts that require the contractor to submit...

  18. 48 CFR 811.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.404... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 811.404 Contract clause. When delivery is required by or on a particular date for f.o.b. destination contracts, the contracting officer...

  19. 48 CFR 925.7004 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 925.7004... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting... solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  20. Short-term contracts: Descending the career ladder

    Science.gov (United States)

    Griffin, Elizabeth

    2002-12-01

    Elizabeth Griffin brings a personal insight to the hurdles that women seeking a scientific career face, arguing that the only gender differences are those of attitude, tradition and style. The policy of employing some but not all academic researchers through short-term contracts is highly divisive, in that it creates a two-tier system not only of opportunities and expectations but also of personal worth and value. Far more women than men are trapped in these career cul-de-sacs, and a seriously large fraction is unable to stay in research until retirement. It is the employment policy that is at fault, not the potential of the researchers or the quality of their research.

  1. Contracting out local road and park services: Economic effects and their strategic, contractual, and competitive conditions

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian; Petersen, Ole Helby; Houlberg, Kurt

    2018-01-01

    such as markets, contracts, municipal strategies and contracting history influence these outcomes. Drawing on original survey data from Danish municipalities, we find that competitive tendering has on average reduced costs. Further analysis shows that savings are not associated with lower quality, thus indicating......The economic rationale for contracting out local services is increasingly contested by empirical research. This article aims to contribute to this literature, first by scrutinising the economic effects of contracting out in local road and park services and, second, by exploring how characteristics...... realise larger savings, whereas the characteristics of markets and contracts do not seem to explain variations in cost savings....

  2. 48 CFR 1552.217-72 - Option to extend the term of the contract-cost-plus-award-fee contract.

    Science.gov (United States)

    2010-10-01

    ... of the contract-cost-plus-award-fee contract. 1552.217-72 Section 1552.217-72 Federal Acquisition...-award-fee contract. As prescribed in 1517.208(c), insert this contract clause in cost-plus-award-fee... Term of the Contract—Cost-Plus-Award-Fee Contract (APR 1984) (a) The Government has the option to...

  3. An Experimental Study of Psychological Contract Breach: The Effects of Exchange Congruence in the Employer - Employee Relationship

    OpenAIRE

    Schaupp , Gretchen Lina

    2012-01-01

    Although the psychological contract has been a popular topic in managerial research for the past twenty years, recent critiques of the research in this area point to several shortcomings. These are believed to result primarily from the overwhelming use of field studies, survey questionnaires, and other correlational procedures in the study of this construct. One particular research question that has generated mixed results involves the effect that oneâ s underlying contract (either transacti...

  4. 42 CFR 93.204 - Contract.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contract. 93.204 Section 93.204 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS... MISCONDUCT Definitions § 93.204 Contract. Contract means an acquisition instrument awarded under the HHS...

  5. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  6. Coordinated research activities: Annual report and statistics for 2005

    International Nuclear Information System (INIS)

    2006-06-01

    in the website at: http://cra.iaea.org/. The Coordinated Research Activities reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Materials Technologies; Nuclear Science; Food and Agriculture; Human Health; Water Resources; Protection of the Marine and Terrestrial Environments; Physical and Chemical Applications; Safety of Nuclear Installations; Radiation and Transport Safety; Management of Radioactive Waste; Nuclear Security. Results of research are available to all Member States and are disseminated through, national, international and Agency scientific and technical publications. The Coordinated Research Activities are complementary to its Technical Cooperation Projects, with the knowledge gained via coordinated research used to enhance the quality of Technical Cooperation Projects. Some research results are directly relevant to Technical Cooperation Projects and lead to successful implementation of these projects, while some Technical Projects lead to participation in Coordinated Research Activities. In addition, CRPs and TC Projects may also be carried out simultaneously. In terms of benefits to Member States through their participating research institutions, number of awards and degree of funding, coordinated research activities constitute a significant component of the Agency's overall programme. 765 contracts and 142 agreements were awarded from the 1170 proposals (992 contract proposals and 178 agreement proposals) received by the Agency during 2005. Annex I lists, by country, the number of proposals received and awards made. In 2005, $7 223 923 from the regular budget, ($166 566 thereof from 2004 unobligated funds), and $169 590 of extra-budgetary contributions totaling $7 393 513 were awarded to institutes under contractual arrangements and to fund Research Coordination Meetings (RCMs). The average award per contract was $6 440, about 6% more than the 2004 average award level

  7. Coordinated research activities: Annual report and statistics for 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-06-15

    in the website at: http://cra.iaea.org/. The Coordinated Research Activities reported in this document are conducted in support of the following Agency programmes: Nuclear Power; Nuclear Fuel Cycle and Materials Technologies; Nuclear Science; Food and Agriculture; Human Health; Water Resources; Protection of the Marine and Terrestrial Environments; Physical and Chemical Applications; Safety of Nuclear Installations; Radiation and Transport Safety; Management of Radioactive Waste; Nuclear Security. Results of research are available to all Member States and are disseminated through, national, international and Agency scientific and technical publications. The Coordinated Research Activities are complementary to its Technical Cooperation Projects, with the knowledge gained via coordinated research used to enhance the quality of Technical Cooperation Projects. Some research results are directly relevant to Technical Cooperation Projects and lead to successful implementation of these projects, while some Technical Projects lead to participation in Coordinated Research Activities. In addition, CRPs and TC Projects may also be carried out simultaneously. In terms of benefits to Member States through their participating research institutions, number of awards and degree of funding, coordinated research activities constitute a significant component of the Agency's overall programme. 765 contracts and 142 agreements were awarded from the 1170 proposals (992 contract proposals and 178 agreement proposals) received by the Agency during 2005. Annex I lists, by country, the number of proposals received and awards made. In 2005, $7 223 923 from the regular budget, ($166 566 thereof from 2004 unobligated funds), and $169 590 of extra-budgetary contributions totaling $7 393 513 were awarded to institutes under contractual arrangements and to fund Research Coordination Meetings (RCMs). The average award per contract was $6 440, about 6% more than the 2004 average award level.

  8. 48 CFR 432.113 - Customary contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 432.113 Section 432.113 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.113 Customary contract financing. The contracting officer may determine the necessity for customary contract financing. The...

  9. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Science.gov (United States)

    2010-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  10. Acid-sensing ion channels contribute to the metaboreceptor component of the exercise pressor reflex

    OpenAIRE

    McCord, Jennifer L.; Tsuchimochi, Hirotsugu; Kaufman, Marc P.

    2009-01-01

    The exercise pressor reflex is evoked by both mechanical and metabolic stimuli arising in contracting skeletal muscle. Recently, the blockade of acid-sensing ion channels (ASICs) with amiloride and A-316567 attenuated the reflex. Moreover, amiloride had no effect on the mechanoreceptor component of the reflex, prompting us to determine whether ASICs contributed to the metaboreceptor component of the exercise pressor reflex. The metaboreceptor component can be assessed by measuring mean arteri...

  11. Moral Contract Theory and Social Cognition : An Empirical Perspective

    NARCIS (Netherlands)

    Timmerman, Peter

    2014-01-01

    This interdisciplinary work draws on research from psychology and behavioral economics to evaluate the plausibility of moral contract theory. In a compelling manner with implications for moral theory more broadly, the author’s novel approach resolves a number of key contingencies in contractarianism

  12. 29 CFR 1926.15 - Relationship to the Service Contract Act; Walsh-Healey Public Contracts Act.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Relationship to the Service Contract Act; Walsh-Healey Public Contracts Act. 1926.15 Section 1926.15 Labor Regulations Relating to Labor (Continued... FOR CONSTRUCTION General Interpretations § 1926.15 Relationship to the Service Contract Act; Walsh...

  13. The psychological contract: enhancing productivity and its implications for long-term care.

    Science.gov (United States)

    Flannery, Raymond B

    2002-01-01

    When hired, a new employee is usually given a job description and an explanation of benefits. In addition, the employee will also have a psychological contract with the organization. This contract, often unstated, reflects the main source of the employee's motivation to work hard. This is true of all groups of employees, including long-term care staff. Common examples of psychological contracts for long-term care administrative staff include autonomy, social acceptance, and being in the forefront of cutting-edge research. An awareness of these psychological contracts can result in better "fits" between employee aspirations and relevant long-term care organization tasks so that productivity is enhanced. This article outlines the steps necessary to create these good fits in ways that benefit both the organization and its employees. These recommendations are of particular relevance to administrators and supervisors in long-term carefacilities.

  14. Contracting between firms: empirical evidence

    NARCIS (Netherlands)

    Iyer, R.; Sautner, Z.

    2014-01-01

    We analyse 185 contracts signed between a buyer and 89 suppliers to test how moral-hazard and hold-up problems affect contract design. Our data allow us to study both static and dynamic effects. If a supplier’s products are more critical to the buyer, contracts contain more clauses that address

  15. 48 CFR 17.204 - Contracts.

    Science.gov (United States)

    2010-10-01

    .... (f) Contracts may express options for increased quantities of supplies or services in terms of (1... identified as the option. (g) Contracts may express extensions of the term of the contract as an amended... on the purchase of additional supplies or services, or the overall duration of the term of the...

  16. Uranium enrichment conference on modified contract option, Oak Ridge, Tennessee, July 22, 1975

    International Nuclear Information System (INIS)

    1975-01-01

    The questions and answers presented in this document originated at an industry-wide meeting sponsored by the Energy Research and Development Administration held in Oak Ridge, Tennessee, on July 22, 1975, to discuss features and provisions of an ERDA plan to adjust contracts held by firms receiving uranium enriching services from ERDA. On June 19, 1975, ERDA announced terms of an expanded contract modification plan. The modified contract option broadened a previous plan proposed on January 15, 1975, by the former Atomic Energy Commission. The meeting in Oak Ridge on July 22, 1975, was designed to provide additional information on the expanded contract option and to offer ample opportunity for questions and answers prior to August 18, 1975, by which time enriching services customers who chose the one-time option had to so notify ERDA. The meeting included presentations by officials of ERDA Headquarters and ERDA's Oak Ridge Operations on the features of the contract adjustment offer, including provisions for contract termination in whole, separative work schedule adjustments, and uranium feed delivery schedule relaxation. (auth)

  17. 48 CFR 1646.201 - Contract Quality Policy.

    Science.gov (United States)

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality... ensure that services acquired under the FEHB contract conform to the contract's quality and audit... assurance program required by the contract and will acknowledge in writing whether or not the system is...

  18. 48 CFR 1515.606-70 - Contracting methods.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  19. 48 CFR 842.101 - Contract audit responsibilities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Audit Services 842.101 Contract audit responsibilities. (a) Contracting officers may use the support services of other agencies to the extent feasible. Examples of such services include: pre-award surveys; quality assurance and technical...

  20. 48 CFR 22.610 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Walsh-Healey Public Contracts Act 22.610... Contracts Act, in solicitations and contracts covered by the Act (see 22.603, 22.604, and 22.605). [61 FR... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clause. 22.610...