Sample records for cofferdams

  1. 29 CFR 1926.802 - Cofferdams.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Cofferdams. 1926.802 Section 1926.802 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Underground Construction, Caissons, Cofferdams and...

  2. Risk analysis of Odelouca cofferdam

    OpenAIRE

    Pimenta, L.; Caldeira, L.; Maranha das Neves, E.

    2009-01-01

    In this paper we present the risk analysis of Odelouca Cofferdam, using an event tree analysis. The initializing events, failure modes and analysed limit states are discussed based on an influence diagram. The constructed event trees and their interpretation are presented. The obtained risk values are represented in an FN plot superimposed to the acceptability and tolerability risk limits proposed for Portuguese dams. Initially, particular emphasis is placed on the main characteristic...

  3. Review of the earthwork for seawater pump room and the construction of big cofferdam

    International Nuclear Information System (INIS)

    Chen Puzhi; Yan Wenkang

    2003-01-01

    The fact that the project of big cofferdam facing the ocean for the pump room is one of prerequisites for the site earthwork and the building constructions was significantly shown in the paper. The design scheme provided by foreign party not exactly conforming with actual conditions resulted in many construction problems. Based on the site condition, Chinese party proposed new construction schemes, which not only ensured the first concrete pouring of the project on June 8, 1998, but also saved several million funds

  4. Stimulating a Great Lakes coastal wetland seed bank using portable cofferdams: implications for habitat rehabilitation

    Science.gov (United States)

    Kowalski, K.P.; Wilcox, D.A.; Wiley, M.J.

    2009-01-01

    Coastal wetland seed banks exposed by low lake levels or through management actions fuel the reestablishment of emergent plant assemblages (i.e., wetland habitat) critical to Great Lakes aquatic biota. This project explored the effectiveness of using portable, water-filled cofferdams as a management tool to promote the natural growth of emergent vegetation from the seed bank in a Lake Erie coastal wetland. A series of dams stretching approximately 450??m was installed temporarily to isolate hydrologically a 10-ha corner of the Crane Creek wetland complex from Lake Erie. The test area was dewatered in 2004 to mimic a low-water year, and vegetation sampling characterized the wetland seed bank response at low, middle, and high elevations in areas open to and protected from bird and mammal herbivory. The nearly two-month drawdown stimulated a rapid seed-bank-driven response by 45 plant taxa. Herbivory had little effect on plant species richness, regardless of the location along an elevation gradient. Inundation contributed to the replacement of immature emergent plant species with submersed aquatic species after the dams failed and were removed prematurely. This study revealed a number of important issues that must be considered for effective long-term implementation of portable cofferdam technology to stimulate wetland seed banks, including duration of dewatering, product size, source of clean water, replacement of damaged dams, and regular maintenance. This technology is a potentially important tool in the arsenal used by resource managers seeking to rehabilitate the functions and values of Great Lakes coastal wetland habitats.

  5. 46 CFR 35.05-15 - Tank vessel security-TB/ALL.

    Science.gov (United States)

    2010-10-01

    ... scuppers, if any, unobstructed; meets any loadline or freeboard requirements; and neither leaks cargo into the water, voids, or cofferdams nor leaks water into the tanks, voids, or cofferdams; (ii) Ensuring... checks are made of every tank barge in the tow for leakage of cargo into the water, voids, or cofferdams...

  6. 46 CFR 151.45-2 - Special operating requirements.

    Science.gov (United States)

    2010-10-01

    ... cargo into the water, voids, or cofferdams nor leaks water into the tanks, voids, or cofferdams; (ii... ballasting) substantially free of water. Periodic inspections and necessary pumping shall be carried out to insure maintenance of such water-free condition in order to minimize the free surface effects, both in...

  7. Experimental study on moonpool resonance of offshore floating structure

    Directory of Open Access Journals (Sweden)

    Seung-Ho Yang

    2013-06-01

    Full Text Available Offshore floating structures have so-called moonpool in the centre area for the purpose of drilling, installation of subsea structures, recovery of Remotely-Operated Vehicle (ROV and divers. However, this vertical opening has an effect on the operating performance of floating offshore structure in the vicinity of moonpool resonance frequency; piston mode and sloshing mode. Experimental study based on model test was carried out. Moonpool resonance of floating offshore structure on fixed condition and motion free condition were investigated. And, the effect of cofferdam which is representative inner structure inside moonpool was examined. Model test results showed that Molin's theoretical formula can predict moonpool resonance on fixed condition quite accurately. However, motion free condition has higher resonance frequency when it is compared with that of motion fixed. The installation of cofferdam moves resonance frequency to higher region and also generates secondary resonance at lower frequency. Furthermore, it was found that cofferdam was the cause of generating waves in the longitudinal direction when the vessel was in beam sea.

  8. A milestone for the Three Gorges

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Rushu [China Yangzte Three Gorges Project Development Corp., Yichang Hubei (China)

    1999-10-01

    Massive flooding of the Yangtze river in 1998 was a serious cause for concern. The Three Gorges river diversion dam project will reduce the danger. The three construction stages are described. A major milestone was the closure of the Yangtze in 1997 and this was effectively the completion of Stage I. Stage II is construction of the earth-rock cofferdam as a temporary reservoir and the key factor for safe construction of the main stage II works in the dry pit. The cofferdam was filled to flood control elevation and up to July 1998 three peak floods had been handled successfully. Work is in hand for dealing with even higher floods. The 17-year scheme is due for completion in 2009. (UK)

  9. 29 CFR Appendix A to Subpart S of... - Decompression Tables

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Underground Construction, Caissons, Cofferdams and Compressed Air Pt. 1926, Subpt. S, App. A Appendix A to Subpart S of Part 1926...

  10. 4D ANIMATION RECONSTRUCTION FROM MULTI-CAMERA COORDINATES TRANSFORMATION

    Directory of Open Access Journals (Sweden)

    J. P. Jhan

    2016-06-01

    Full Text Available Reservoir dredging issues are important to extend the life of reservoir. The most effective and cost reduction way is to construct a tunnel to desilt the bottom sediment. Conventional technique is to construct a cofferdam to separate the water, construct the intake of tunnel inside and remove the cofferdam afterwards. In Taiwan, the ZengWen reservoir dredging project will install an Elephant-trunk Steel Pipe (ETSP in the water to connect the desilting tunnel without building the cofferdam. Since the installation is critical to the whole project, a 1:20 model was built to simulate the installation steps in a towing tank, i.e. launching, dragging, water injection, and sinking. To increase the construction safety, photogrammetry technic is adopted to record images during the simulation, compute its transformation parameters for dynamic analysis and reconstruct the 4D animations. In this study, several Australis© coded targets are fixed on the surface of ETSP for auto-recognition and measurement. The cameras orientations are computed by space resection where the 3D coordinates of coded targets are measured. Two approaches for motion parameters computation are proposed, i.e. performing 3D conformal transformation from the coordinates of cameras and relative orientation computation by the orientation of single camera. Experimental results show the 3D conformal transformation can achieve sub-mm simulation results, and relative orientation computation shows the flexibility for dynamic motion analysis which is easier and more efficiency.

  11. Tidal interaction of galaxies

    International Nuclear Information System (INIS)

    Kozlov, N.N.; Syunyaev, R.A.; Ehneev, T.M.

    1974-01-01

    One of the hypotheses explaining the occurrence of anomalous details in interacting galaxies has been investigated. Pairs of galaxies with 'tails' oppositely directed or neighbouring galaxies with cofferdams 'bridges', as if connecting the galaxies, are called interacting galaxies. The hypothesis connects the origin of cofferdams and 'tails' of interacting galaxies with tidal effects ; the action of power gravitational forces in the intergalactic space. A source of such forces may be neighbouring stellar systems or invisible bodies, for instance, 'dead' quasars after a gravitational collapse. The effect of large masses of matter on the galaxy evolution has been investigated in the Institute of Applied Mathematics of the Academy of Sciences of the USSSR in 1971-1972 by numerical simulation of the process on a digital computer with the subsequent data transmission on a display. Different versions of a massive body flight relative to a galaxy disk are considered. Photographs of a display screen at different moments of time are presented. As a result of mathematical simulation of galaxies gravitational interactions effects are discovered which resemble real structures in photographs of galaxies. It seems to be premature to state that namely these mechanisms cause the formation of 'tails' and cofferdams between galaxies. However, even now it is clear that the gravitational interaction strongly affects the dynamics of the stellar system evolution. Further studies should ascertain a true scale of this effect and its genuine role in galaxy evolution

  12. Underwater noise reduction of marine pile driving using a double pile.

    Science.gov (United States)

    2015-12-01

    Impact pile driving of steel piles in marine environments produces extremely high sound levels in the water. : It has been shown that current pile driving noise attenuation techniques, such as bubble curtains and : cofferdams, provide limited noise r...

  13. 18 CFR 12.23 - Time for filing emergency action plan.

    Science.gov (United States)

    2010-04-01

    ... begins. (2) Temporary impoundment during construction. (i) For any unconstructed project, if a temporary impoundment would be created during construction, such as through construction of temporary or permanent cofferdams or large sediment control structures, and an accident to or failure of the impounding structures...

  14. Experience and prospects of using the pneumatic designs in underground mining

    Energy Technology Data Exchange (ETDEWEB)

    Rakhutin, V.S. [National Mining University of Ukraine, Dnipropetrovsk (Ukraine)

    1999-07-01

    The article reviews the experience of application of pneumatic designs ('flexible shells') in coal mines (pneumatic cogs and supports), ore mines (pneumatic cofferdams and partitions in filling), and in the construction of mines and underground constructions (pneumatic casings, temporary (pilot) supports). 2 refs.

  15. 29 CFR 1926.801 - Caissons.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Caissons. 1926.801 Section 1926.801 Labor Regulations...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Underground Construction, Caissons, Cofferdams and Compressed Air § 1926.801 Caissons. (a) Wherever, in caisson work in which compressed air is used, and the...

  16. 77 FR 50473 - Taking of Marine Mammals Incidental to Specified Activities; Construction of the East Span of the...

    Science.gov (United States)

    2012-08-21

    ..., or at a landfill reuse site, as directed by the Dredged Material Management Office (DMMO). For...., dewatered cofferdam). A maximum of twenty piles may be impact-driven per day. In the event a pipe pile is..., motivation, experience, demography) and is also difficult to predict (Southall et al. 2007). The proposed...

  17. 2D Hydrodynamic Investigation of Olmsted Cofferdams

    Science.gov (United States)

    2013-07-01

    34  Figure 30. HEC - RAS cross-section locations in the AdH 2012. ........................................................... 34...stress in Pascals for Condition 1 (typical). ........................................................ 40  Figure 43. HEC - RAS cross-section locations in...Then in 2008, CHL used an Adaptive Hydraulics model (AdH) to further evaluate potential impacts on mussel beds. In 2012, LRL used a HEC - RAS model to

  18. Water Power in The Wilderness: The History of Bonneville Lock and Dam

    Science.gov (United States)

    1997-01-01

    yards of material. Reinforced concrete cutoff walls at each abutment and reinforced concrete coun- terfort type upstream wing walls, along with...at the ends of the dam, the abutment Blasting of boulder no. 8 for navigation channel at Cascade Rapids . walls had to be built over 150 feet high...completion of the entire north section during 1936-37, the contractors placed a prefabricated struc- tural steel cofferdam over the crest section

  19. IVO develops a new repair technique for underwater sites. Viscous doughlike substance underwater cracks

    Energy Technology Data Exchange (ETDEWEB)

    Klingstedt, G.; Leisio, C. [ed.

    1998-07-01

    A viscous sealant is revolutionizing repair of the stone and concrete masonry of underwater dams, bridges and canals. There is now no need for expensive and time-consuming cofferdams, since a diver can extrude quick-setting mortar into underwater structures needing repair. This technique has worked well in recent years in various parts of Finland even in strongly flowing water. IVO experts are now starting to look more beyond the borders of Finland

  20. Construction safety in DOE. Part 2, Students guide

    Energy Technology Data Exchange (ETDEWEB)

    Handwerk, E.C.

    1993-08-01

    This report is the second part of a compilation of safety standards for construction activities on DOE facilities. This report covers the following areas: floor and wall openings; cranes, derricks, hoists, elevators, and conveyors; motor vehicles, mechanized equipment, and marine operations; excavations; concrete and masonry construction; steel erection; underground construction, caisson, cofferdams, and compressed air; demolition; blasting and the use of explosives; power transmission and distribution; rollover protective structures, overhead protection; and ladders.

  1. Port construction works in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Narahara, Akio; Minamata, Hisashi; Harada, Kensaku

    1982-01-01

    Sendai Nuclear Power Station is the second nuclear power station of Kyushu Electric Power Co., Inc., with two PWR plants of 890 MW each, and the operation of No.1 plant will be started in July, 1984, and that of No.2 plant in March, 1986. The civil engineering works for both plants were started in June, 1978, and March, 1981, respectively, and the rate of progress as of the end of September, 1982, was 97 % and 66 %, respectively. In the construction of this power station, the port facility was provided for the transport of construction materials and spent fuel, and for the intake of condenser cooling water. In order to make the construction by dry work, the double cofferdam structures with steel sheet piles were made offshore. The use of the wharf was started in March, 1980, though typhoons hit the area several times, and the dredging in the port was completed in May, 1982. The outline of the plan of this power station, the state of affairs before the start of construction, the outline of the port construction works, the topography, geological features and sea conditions, the design of the port such as breakwaters, unloading wharf and water intake, the manufacture and installation of caissons, dredging, and the temporary cofferdam works for water intake are described. (author)

  2. Environmental effects of the Big Rapids dam remnant removal, Big Rapids, Michigan, 2000-02

    Science.gov (United States)

    Healy, Denis F.; Rheaume, Stephen J.; Simpson, J. Alan

    2003-01-01

    The U.S. Geological Survey (USGS), in cooperation with the city of Big Rapids, investigated the environmental effects of removal of a dam-foundation remnant and downstream cofferdam from the Muskegon River in Big Rapids, Mich. The USGS applied a multidiscipline approach, which determined the water quality, sediment character, and stream habitat before and after dam removal. Continuous water-quality data and discrete water-quality samples were collected, the movement of suspended and bed sediment were measured, changes in stream habitat were assessed, and streambed elevations were surveyed. Analyses of water upstream and downstream from the dam showed that the dam-foundation remnant did not affect water quality. Dissolved-oxygen concentrations downstream from the dam remnant were depressed for a short period (days) during the beginning of the dam removal, in part because of that removal effort. Sediment transport from July 2000 through March 2002 was 13,800 cubic yards more at the downstream site than the upstream site. This increase in sediment represents the remobilized sediment upstream from the dam, bank erosion when the impoundment was lowered, and contributions from small tributaries between the sites. Five habitat reaches were monitored before and after dam-remnant removal. The reaches consisted of a reference reach (A), upstream from the effects of the impoundment; the impoundment (B); and three sites below the impoundment where habitat changes were expected (C, D, and E, in downstream order). Stream-habitat assessment reaches varied in their responses to the dam-remnant removal. Reference reach A was not affected. In impoundment reach B, Great Lakes and Environmental Assessment Section (GLEAS) Procedure 51 ratings went from fair to excellent. For the three downstream reaches, reach C underwent slight habitat degradation, but ratings remained good; reach D underwent slight habitat degradation with ratings changing from excellent to good; and, in an area

  3. Evaluating the Response of Biological Assemblages as Potential Indicators for Restoration Measures in an Intermittent Mediterranean River

    Science.gov (United States)

    Hughes, Samantha Jane; Santos, Jose; Ferreira, Teresa; Mendes, Ana

    2010-08-01

    Bioindicators are essential for detecting environmental degradation and for assessing the success of river restoration initiatives. River restoration projects require the identification of environmental and pressure gradients that affect the river system under study and the selection of suitable indicators to assess habitat quality before, during and after restoration. We assessed the response of benthic macroinvertebrates, fish, bird and macrophyte assemblages to environmental and pressure gradients from sites situated upstream and downstream of a cofferdam on the River Odelouca, an intermittent Mediterranean river in southwest Portugal. The Odelouca will be permanently dammed in 2010. Principal Component Analyses (PCA) of environmental and pressure variables revealed that most variance was explained by environmental factors that clearly separated sites upstream and downstream of the partially built cofferdam. The pressure gradient describing physical impacts to the banks and channel as a result of land use change was less distinct. Redundancy Analysis revealed significant levels of explained variance to species distribution patterns in relation to environmental and pressure variables for all 4 biological assemblages. Partial Redundancy analyses revealed high levels of redundancy for pH between groups and that the avifauna was best associated with pressures acting upon the system. Patterns in invertebrates and fish were associated with descriptors of habitat quality, although fish distribution patterns were affected by reduced connectivity. Procrustean and RELATE (Mantel test) analyses gave broadly similar results and supported these findings. We give suggestions on the suitability of key indicator groups such as benthic macroinvertebrates and endemic fish species to assess in stream habitat quality and appropriate restoration measures, such as the release of peak flow patterns that mimic intermittent Mediterranean systems to combat habitat fragmentation and

  4. Numerical and physical modeling of water flow over the ogee weir of the new Niedów barrage

    Directory of Open Access Journals (Sweden)

    Herrera-Granados Oscar

    2016-03-01

    Full Text Available In this paper, two- and three-dimensional numerical modeling is applied in order to simulate water flow behavior over the new Niedów barrage in South Poland. The draining capacity of one of the flood alleviation structures (ogee weir for exploitation and catastrophic conditions was estimated. In addition, the output of the numerical models is compared with experimental data. The experiments demonstrated that the draining capacity of the barrage alleviation scheme is sufficiently designed for catastrophic scenarios if water is flowing under steady flow conditions. Nevertheless, the new cofferdam, which is part of the temporal reconstruction works, is affecting the draining capacity of the whole low-head barrage project.

  5. Cracking control in mass concrete for three gorges dam; Sankyo damu ni okeru masu konkurito no hibiware yokusei

    Energy Technology Data Exchange (ETDEWEB)

    Chu, CHuanying

    1999-09-10

    The provisional cofferdam work of the mainstream of Three Gorges Dam project was successfully finished on November 8, 1997. Now, the work enters its second stage, and the placing of large-scale concrete was started. The total quantity of concrete used in this project reaches 15.00 million m{sup 3}. Inhibition of dam concrete cracking is an important subject. In order to manufacture concrete with good crack-resistance, cements, fly ashes, aggregates and blending agents are strictly selected; and hydration-generating heat is reduced by means of strict temperature control, precooling of aggregates, reduction of placing temperature and concrete temperature in mixers, and the like. As a consequence of maintaining the highest temperature value in concrete blocks to be lower than a predetermined value, harmful cracks can be prevented from occurring when the temperature in the dam lowers. (NEDO)

  6. Water and sustainable land use at the ancient tropical city of Tikal, Guatemala.

    Science.gov (United States)

    Scarborough, Vernon L; Dunning, Nicholas P; Tankersley, Kenneth B; Carr, Christopher; Weaver, Eric; Grazioso, Liwy; Lane, Brian; Jones, John G; Buttles, Palma; Valdez, Fred; Lentz, David L

    2012-07-31

    The access to water and the engineered landscapes accommodating its collection and allocation are pivotal issues for assessing sustainability. Recent mapping, sediment coring, and formal excavation at Tikal, Guatemala, have markedly expanded our understanding of ancient Maya water and land use. Among the landscape and engineering feats identified are the largest ancient dam identified in the Maya area of Central America; the posited manner by which reservoir waters were released; construction of a cofferdam for dredging the largest reservoir at Tikal; the presence of ancient springs linked to the initial colonization of Tikal; the use of sand filtration to cleanse water entering reservoirs; a switching station that facilitated seasonal filling and release; and the deepest rock-cut canal segment in the Maya Lowlands. These engineering achievements were integrated into a system that sustained the urban complex through deep time, and they have implications for sustainable construction and use of water management systems in tropical forest settings worldwide.

  7. Results of repeat bathymetric and velocimetric surveys at the Amelia Earhart Bridge on U.S. Highway 59 over the Missouri River at Atchison, Kansas, 2009-2013

    Science.gov (United States)

    Huizinga, Richard J.

    2013-01-01

    Bathymetric and velocimetric data were collected six times by the U.S. Geological Survey, in cooperation with the Kansas Department of Transportation, in the vicinity of Amelia Earhart Bridge on U.S. Highway 59 over the Missouri River at Atchison, Kansas. A multibeam echosounder mapping system and an acoustic Doppler current meter were used to obtain channel-bed elevations and depth-averaged velocities for a river reach approximately 2,300 feet long and extending across the active channel of the Missouri River. The bathymetric and velocimetric surveys provide a “snapshot” of the channel conditions at the time of each survey, and document changes to the channel-bed elevations and velocities during the course of construction of a new bridge for U.S. Highway 59 downstream from the Amelia Earhart Bridge. The baseline survey in June 2009 revealed substantial scour holes existed at the railroad bridge piers upstream from and at pier 10 of the Amelia Earhart Bridge, with mostly uniform flow and velocities throughout the study reach. After the construction of a trestle and cofferdam on the left (eastern) bank downstream from the Amelia Earhart Bridge, a survey on June 2, 2010, revealed scour holes with similar size and shape as the baseline for similar flow conditions, with slightly higher velocities and a more substantial contraction of flow near the bridges than the baseline. Subsequent surveys during flooding conditions in June 2010 and July 2011 revealed substantial scour near the bridges compared to the baseline survey caused by the contraction of flow; however, the larger flood in July 2011 resulted in less scour than in June 2010, partly because the removal of the cofferdam for pier 5 of the new bridge in March 2011 diminished the contraction near the bridges. Generally, the downstream part of the study reach exhibited varying amounts of scour in all of the surveys except the last when compared to the baseline. During the final survey, velocities throughout the

  8. Working in the Dry: Cofferdams, In-River Construction, and the United States Army Corps of Engineers

    Science.gov (United States)

    2009-01-01

    and dams to manage before 1897, but within 10 years, they would have twenty. Many of the MNC engineers had gained practical experience in small lock...America’s water- ways untapped or under-exploited raw mate- rials requiring development, control, and management for human benefit.6 During the colonial...Section , ^ N 6 to sink into position ^ 5ection 5 Gr<eo.test dapth of waiter in which skeleton wa.s a.ctua.1 ly constru_cted wSig_Lfl fee

  9. Ultrasonic-testing method

    International Nuclear Information System (INIS)

    Thome, Paul.

    1973-01-01

    Description is given of a device adapted to the detection, by means of ultrasonic waves, of all the flaws and defects included in workpieces when only one face of the latter is accessible. A beam is directed towards the rear-face of the workpiece (e.g. a plate) on which it is reflected. The image thus reflected is fed into a receiver. The latter is under the control of the displacement of that image; simultaneously a transducer checks the condition of the mirror at the places where the beam is reflected. Whenever a flow or defect comes between, a silent zone is formed. By recording the silent zones with respect to the positions of several emitters, it is possible to locates a flaw and to define the outline thereof. The apparatus comprises several ''emitter-receiver'' groups intersecting over the emitter used in order to check the good conditions of the mirror. The invention can be used for searching and identifying flaws and defects in buildings which have to be of top quality (e.g., cofferdams, nuclear devices, shipbuilding yards, aeronautics) [fr

  10. A thermodynamic and heat transfer model for LNG ageing during ship transportation. Towards an efficient boil-off gas management

    Science.gov (United States)

    Krikkis, Rizos N.

    2018-06-01

    A non-equilibrium thermodynamic and heat transfer model for LNG ageing during ship transportation has been developed based on experimental data. The measurements reveal that the liquid temperature remains nearly constant, whereas significant variations are observed for the gas temperature. The measurement of the liquid temperature along the tank height suggests that a small scale rollover phenomenon may have taken place in one cargo tank. A time dependent heat transfer mechanism has been considered by taking into account the temperature variations of the atmospheric air, the seawater and the cofferdam environment which affect the cargo tanks. An important finding is that the evaporation rate (boil-of rate) is forced to follow the fuel flow consumption profile imposed by the vessel's propulsion system in order to match the tank pressure and volume constraints. The theoretical model is favorably compared to a comprehensive set on per hour basis of on board measurements of cargo temperatures and pressures, recorded during laden voyages, providing a better understanding of the underlying processes involved. The dominant role of the fuel consumption on the evaporation rate may be utilized in order to devise an efficient cargo management strategy during the laden voyage.

  11. Radiation protection in exploitation of uranium ores

    International Nuclear Information System (INIS)

    Pavlov, I.V.; Shalaev, I.L.

    1976-01-01

    The results are analyzed of the study of the radiation conditions in uranium mines, design and testing of protection means, improvement of methods and equipment for the dosimetric control in different countries since 1968 to 1975. There are outlined radiation hazards and their role in the formation of the radiation situation in mines, dispersive composition of aerosols of short-living daughter products of Rn(DPR) in the mine atmosphere. Among means of the radiation protection the following are dealt with: ventilation including the calculation of air requirements, design of ventilation systems, ventilation practices in working mines; lowering of the release of radon into the mine atmosphere by isolating non-exploited pits, application of gas-proof covers to cofferdams in faces of jointing zones, intensification of mining works in dangerous zones. Methods of air cleaning to remove Rn are suggested in brief. Apparatus are described for the individual control of the level of latent energy in the zone of miners' respiration: track dosimeters, thermoluminescent crystalls (TLC), photographic films, semiconductor systems and biophysical methods of the control for uranium mines. The efficient use of existing protection means provides the normal radiation situation in mines without significant additional investments

  12. Nitrogen and phosphorus budget of a polyculture system of sea cucumber ( Apostichopus japonicus), jellyfish ( Rhopilema esculenta) and shrimp ( Fenneropenaeus chinensis)

    Science.gov (United States)

    Li, Junwei; Dong, Shuanglin; Gao, Qinfeng; Zhu, Changbo

    2014-06-01

    The nitrogen (N) and phosphorus (P) budget and the ecological efficiency of a polyculture system of sea cucumber ( Apostichopus japonicus), jellyfish ( Rhopilema esculenta) and shrimp ( Fenneropenaeus chinensis) were studied in a cofferdam, 120.2 ha in size. The nutrients were supplied by spring tide inflow. In total, 139600 kg N yr-1 and 9730 kg P yr-1 input to the system; while 118900 kg N yr-1 and 2840 kg P yr-1 outflowed from the system concurrently, thus the outflow was 85.7% (N) and 29.2% (P) of inflow. The production of N and P was 889.5 kg yr-1 and 49.28 kg yr-1 (sea cucumber) and 204 kg yr-1 and 18.03 kg yr-1 (jellyfish and shrimp), respectively. The utilization rate of N and P by polycultured animals was 7.8‰ and 6.9‰, respectively, 21.9% and 38% higher than that of monocultured sea cucumber. Our results indicated that the polyculture system was an efficient culture system of animals and a remediation system of coastal environment as well; it scavenged 14.3% and 70.8% of N and P, respectively. Such an ecological efficiency may be improved further by increasing either the stocking density or the size of sea cucumber or both.

  13. A natural ice boom

    Energy Technology Data Exchange (ETDEWEB)

    Hopper, H.R. [Manitoba Hydro, Winnipeg, MB (Canada)

    1998-10-01

    Planning for ice jams and ice movements are critical on the Nelson River in northern Manitoba in designing cofferdams. Experience on the St. Lawrence River demonstrated the possibility of exercising some control over ice action by judicious placement of log booms or ice control structures. The success of experiments with man-made controls led to field tests in which an ice sheet of sufficient magnitude and competence was introduced into the open water stream of the Nelson River. The ice sheet was subsequently jammed in a narrow channel, thereby creating a natural ice bridge or boom upstream of a proposed hydro development. Under favourable conditions, this boom would initiate the progression of the ice cover from its location upstream, cutting off the downstream reach from the ice producing potential of the upstream reach. Although ice would still be generated downstream, the length of the reach between the ice boom and the development site would be short enough that ice jamming at the development site would never occur. Although problems in blasting prevented the introduction of a competent ice sheet into the main stream of the river at the location chosen, sufficient confidence in the theory was gained to warrant further consideration. 4 refs., 1 tab., 10 figs.

  14. Abandonment of the low level outlet structure at the McGregor South Dam

    Energy Technology Data Exchange (ETDEWEB)

    Mack, D.L; Murray, T.K. [Klohn-Crippen Consultants Ltd., Calgary, AB (Canada); Soutar, B.M. [Alberta Transportation, Edmonton, AB (Canada)

    2008-07-01

    The Carseland-Bow River Headworks (CBRH) is a major multi-purpose water delivery system, situated in southern Alberta. It supplies water to 87,000 hectares of agricultural land and several municipalities. The system was originally built starting in 1909. It consists of diversion works on the Bow River, 65 kilometres of canal, and the McGregor and Little Bow reservoirs. In the 1950s, the system was rehabilitated by the Prairie Farm Rehabilitation Administration (PFRA), and Travers Reservoir was added in 1954. In 1973, ownership and operation of the CBRH system was turned over to Alberta Environment. In 2001, Alberta Transportation implemented a major program to rehabilitate and upgrade the CBRH system. This program included increasing the capacity of the canals and structures, and upgrading the dams to meet current dam safety guidelines. The project involved raising the north and south dams, providing an auxiliary spillway to accommodate the probable maximum flood (PMF), and rehabilitating the existing reservoir inlet and low level outlet structures. This paper discussed the abandonment of the existing low level outlet structure located within the south dam. The paper discussed the existing dams and outlet structure as well as the south dam and outlet structure. The abandonment of the existing low level outlet structure was discussed in terms of general construction; demolition; upstream conduits and gatewell; and downstream conduit. Several illustrations and photographs of the dam and the demolition were presented. It was concluded that the in-place abandonment of the existing low level outlet structure at the McGregor South Dam provides significant advantages, including eliminating the need to construct and remove an extensive cofferdam within the reservoir. 6 refs., 2 tabs., 4 figs.

  15. PERMEABILITY OF SAVCIBEY DAM (BİLECİK AXIS LOCATION AND DESIGN OF GROUT CURTAIN

    Directory of Open Access Journals (Sweden)

    Mustafa Can Canoğlu

    2016-12-01

    Full Text Available This study comprise the design of the planned grout curtain in Savcıbey Dam (Söğüt/Bilecik in order to provide impermeability along the dam axis. Within the context of field studies, engineering geology map was generated, ground investigation drilling was realized and permeability tests were performed. Within the field studies, the joint conditions of the geological units (Triassic aged Bozuyük Metamorphic schists under the dam axis and its effect on permeability was observed considering the positions of the discontinuities with regard to the dam axis location. Orientation of discontinuities generally have strikes changing between N – S and NNE – SSW. 5 boreholes on dam axis, 2 boreholes on cofferdam, 3 boreholes on diversion tunnel and 2 boreholes on spillway total 245 m ground investigation borehole were drilled. In order to determine the permeability profile of dam axis and design the grout curtain, Lugeon tests in Bozuyük Metamorphic units observed in dam axis, falling head permeability tests in alluviums observed in thalveg and slope debris observed in right abutment were performed. Lugeon tests realized in Bozuyük Metamorphic units show that the unit is generally permeable and partly low permeable. Alluvium and slope debris are highly permeable. In addition, drilling works realized in dam axis shows that the augmentation of the weathering degree cause an increase of permeability in Triassic aged Bozüyük Metamorphic schists. As a result of these studies information about the permeability of Savcıbey Dam was collected and the grout curtain hole was designed. Accordingly, it is predicted that approximately 40 m depth of grout curtain from the stripping excavation with the depth of 1.50 m would prevent the possible leakages.

  16. Evaluation of Terrestrial Laser Scanner Accuracy in the Control of Hydrotechnical Structures

    Science.gov (United States)

    Muszyński, Zbigniew; Rybak, Jarosław

    2017-12-01

    In many cases of monitoring or load testing of hydrotechnical structures, the measurement results obtained from dial gauges may be affected by random or systematic errors resulting from the instability of the reference beam. For example, the measurement of wall displacement or pile settlement may be increased (or decreased) by displacements of the reference beam due to ground movement. The application of surveying methods such as high-precision levelling, motorized tacheometry or even terrestrial laser scanning makes it possible to provide an independent reference measurement free from systematic errors. It is very important in the case of walls and piles embedded in the rivers, where the construction of reference structure is even more difficult than usually. Construction of an independent reference system is also complicated when horizontal testing of sheet piles or diaphragm walls are considered. In this case, any underestimation of the horizontal displacement of an anchored or strutted construction leads to an understated value of the strut's load. These measurements are even more important during modernization works and repairs of the hydrotechnical structures. The purpose of this paper is to discuss the possibilities of using modern measurement methods for monitoring of horizontal displacements of an excavation wall. The methods under scrutiny (motorized tacheometry and terrestrial laser scanning) have been compared to classical techniques and described in the context of their practical use on the example hydrotechnical structure. This structure was a temporary cofferdam made from sheet pile wall. The research continuously conducted at Wroclaw University of Science and Technology made it possible to collect and summarize measurement results and practical experience. This paper identifies advantages and disadvantages of both analysed methods and presents a comparison of obtained measurement results of horizontal displacements. In conclusion, some

  17. Geomorphic response of the Sandy River, Oregon, to removal of Marmot Dam

    Science.gov (United States)

    Major, Jon J.; O'Connor, Jim E.; Podolak, Charles J.; Keith, Mackenzie K.; Grant, Gordon E.; Spicer, Kurt R.; Pittman, Smokey; Bragg, Heather M.; Wallick, J. Rose; Tanner, Dwight Q.; Rhode, Abagail; Wilcock, Peter R.

    2012-01-01

    The October 2007 breaching of a temporary cofferdam constructed during removal of the 15-meter (m)-tall Marmot Dam on the Sandy River, Oregon, triggered a rapid sequence of fluvial responses as ~730,000 cubic meters (m3) of sand and gravel filling the former reservoir became available to a high-gradient river. Using direct measurements of sediment transport, photogrammetry, airborne light detection and ranging (lidar) surveys, and, between transport events, repeat ground surveys of the reservoir reach and channel downstream, we monitored the erosion, transport, and deposition of this sediment in the hours, days, and months following breaching of the cofferdam. Rapid erosion of reservoir sediment led to exceptional suspended-sediment and bedload-sediment transport rates near the dam site, as well as to elevated transport rates at downstream measurement sites in the weeks and months after breaching. Measurements of sediment transport 0.4 kilometers (km) downstream of the dam site during and following breaching show a spike in the transport of fine suspended sediment within minutes after breaching, followed by high rates of suspended-load and bedload transport of sand. Significant transport of gravel bedload past the measurement site did not begin until 18 to 20 hours after breaching. For at least 7 months after breaching, bedload transport rates just below the dam site during high flows remained as much as 10 times above rates measured upstream of the dam site and farther downstream. The elevated sediment load was derived from eroded reservoir sediment, which began eroding when a meters-tall knickpoint migrated about 200 m upstream in the first hour after breaching. Rapid knickpoint migration triggered vertical incision and bank collapse in unconsolidated sand and gravel, leading to rapid channel widening. Over the following days and months, the knickpoint migrated upstream more slowly, simultaneously decreasing in height and becoming less distinct. Within 7 months

  18. Puente de hormigón pretensado sobre el río Caroni

    Directory of Open Access Journals (Sweden)

    Fernández, Álvaro

    1964-06-01

    Full Text Available This bridge consists of a. series of portal frames, of 96 m span each, making up a total length of about 500 m. The piles over the river have caused certain difficulties, and it became necessary to build a number cofferdams with sheetpiling, which became permanent formwork for the concrete foundations. The deck is a box section beam, of prestressed concrete. The most notable aspect of this structure is the constructive method. The total length of the deck was divided into 50 sections, each of them prefabricated at a nearby workshop. Each section was aligned along the deck axis: the deck already built serving as sliding ramp for each successive section. To carry out this difficult operation, neoprene was employed, which has a very low friction coefficient, on sliding over steel. To push the heavy table sections to their final position use has been made of hydraulic jacks. After these initial operations were completed, the groups of prestressed cables were correctly aligned: these cables had been provisionally stretched, during the process of putting the deck sections together. These groups of cables are attached to the inner surface of the side walls of the box sections of the deck.Este puente consta de una serie de tramos porticados de luces máximas (96 m , con longitud total de unos 500 metros. Las pilas o soportes han presentado cierta dificultad en los tramos correspondientes al río, pues han sido necesarias ataguías formadas por células de tablestacas que han servido de encofrados perdidos para hormigonar los cimientos. El conjunto del tablero está constituido por una viga-cajón, de hormigón pretensado. La particularidad más notable de esta estructura radica en los métodos constructivos llevados a cabo en su realización. La longitud total del tablero se ha subdividido en 50 trozos prefabricados en un taller próximo al puente y alineado con el eje del mismo, que ha servido de rampa para el traslado y corrimiento a su posici

  19. El puente Woodrow Wilson Memorial

    Directory of Open Access Journals (Sweden)

    Editorial, Equipo

    1964-06-01

    Full Text Available The project for the new bridge over the Potomac river, which is 1,800 m long, and will be situated within the metropolitan zone of Washington had to be approved by the Arts Commission of the local council, which is responsible for the aesthetic quality of all new urban developments. This important bridge consists of multiple short span arches and a drawbridge span, over the navigable canal. The wide deck, carrying altogether six lanes of traffic, is supported on groups of four cylindrical posts, of reinforced concrete. Each of these posts rests on a number of fairly deeply driven prestressed concrete piles. The position of each of these was fixed by means of a timber guide, which mutually related the position of the various piles. After driving in all the piles, a concrete slab was constructed on top of them, which in turn supports the palissade of four posts. The whole operation was carried out within cofferdams built with sheetpiling. The construction of the deck was a straightforward operation, and only the drawbridge, supported on four hinges, involved certain difficulties owing to the need that these hinges be perfectly aligned at all times.El proyecto de ejecución del nuevo puente sobre el río Potomac, de 1.800 m de longitud total, en la zona metropolitana de Washington (Estados Unidos, ha necesitado la aprobación de la Comisión de Bellas Artes, encargada de velar por la armonía general del paisaje circundante. Esta importante obra, de tramos múltiples, de reducidas luces, presenta la particularidad de un tramo levadizo, que salva el canal navegable y rompe la continuidad entre los otros tramos adyacentes. Las pilas que soportan la amplia calzada —de seis bandas agrupadas en dos direcciones únicas de circulación—, son del tipo de cuatro montantes cilíndricos, de hormigón, y en forma de palizada. Cada una de las pilas descansa sobre una serie de pilotes, bastante profundos, de hormigón pretensado. La hinca de pilotes se