  1. The Fernald Closure Project: Lessons Learned

    International Nuclear Information System (INIS)

    Murphy, Cornelius M.; Carr, Dennis

    2008-01-01

    -state determinations; - Interaction with stakeholders; - The balanced approach - on-site and off-site waste-disposal alternatives; - The contracting model; - Site safety performance; - Effectiveness of cleanup remedies; - Worker training and transition; - Client interface; - Cost and schedule performance; - Legacy management. Lessons learned can be applied: While each site and project has its own issues, the various lessons learned from the Fernald Closure Project, when taken from a global perspective, can be applied to similar efforts so that pitfalls are avoided and efficiencies realized

  2. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  3. Closure of a mixed waste landfill: Lessons learned

    International Nuclear Information System (INIS)

    Phifer, M.A.

    1990-01-01

    Much experience has been gained during the closure of the Mixed Waste Management Facility (MWMF) at the Savannah River Site (SRS) and many lessons were learned. This knowledge was applied to other closures at SRS yielding decreased costs, schedule enhancement, and increased overall project efficiency. The next major area of experience to be gained at SRS in the field of waste site closures will be in the upkeep, maintenance, and monitoring of clay caps. Further test programs will be required to address these requirements

  4. The Finishing Touch: Anatomy of Expert Lesson Closures

    Science.gov (United States)

    Webster, Collin A.; Connolly, Graeme; Schempp, Paul G.

    2009-01-01

    Background: Based on the idea that students remember best what is presented last, the lesson closure is commonly identified as an important component of effective teaching and has recently surfaced as a routine practice of expert teachers in sport. Despite its link to both effective and expert instruction, the lesson closure has seen scarce…

  5. Fernald closure project - Lessons learned in the execution of this successful project, completed October 2006

    International Nuclear Information System (INIS)

    Murphy, Cornelius; Reising, Johnny

    2007-01-01

    Available in abstract form only. Full text of publication follows: This paper explores the history and lessons learned on the United States' Department of Energy's (DoE's) Fernald Closure Project - from the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies that were achieved. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion dollar mega environmental-remediation project that was completed in October 2006. During a period of nearly 37 years, Fernald produced 250,000 tons of high-purity, low-enriched uranium for the U.S. defense program, generating more than six million tons of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. The project comprised four phases: 1. Determining the extent of damage to the environment and groundwater at, and adjacent to, the production facilities 2. Selecting cleanup criteria - final end states that had to be met to protect human health and the environment 3. Selecting and implementing the remedial actions that would meet the cleanup goals 4. Doing the work safely, compliantly and cost-effectively. In the project's early stages, there were strained relationships and total distrust between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. (authors)

  6. Lessons learned bulletin

    International Nuclear Information System (INIS)

    1994-05-01

    During the past four years, the Department of Energy -- Savannah River Operations Office and the Westinghouse Savannah River Company (WSRC) Environmental Restoration (ER) Program completed various activities ranging from waste site investigations to closure and post closure projects. Critiques for lessons learned regarding project activities are performed at the completion of each project milestone, and this critique interval allows for frequent recognition of lessons learned. In addition to project related lessons learned, ER also performs lessons learned critiques. T'he Savannah River Site (SRS) also obtains lessons learned information from general industry, commercial nuclear industry, naval nuclear programs, and other DOE sites within the complex. Procedures are approved to administer the lessons learned program, and a database is available to catalog applicable lessons learned regarding environmental remediation, restoration, and administrative activities. ER will continue to use this database as a source of information available to SRS personnel

  7. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  8. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    International Nuclear Information System (INIS)

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  9. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  10. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  11. Transition and Closeout of the Former DOE Mound Plant Site: Lessons Learned

    International Nuclear Information System (INIS)

    Carpenter, C. P.; Marks, M. L.; Smiley, S.L.; Gallaher, D. M.

    2006-01-01

    The U.S. Department of Energy's (DOE's) Office of Environmental Management (EM) manages the Miamisburg Closure Project (MCP) by cleaning up the Mound site, located in Miamisburg, Ohio, to specific environmental standards, conveying all excess land parcels to the Miamisburg Mound Community Improvement Corporation, and transferring all continuing DOE post-closure responsibilities to the Office of Legacy Management (LM). Presently, the EM cleanup contract of the Mound site with CH2M Hill Mound Inc. is scheduled for completion on March 31, 2006. LM manages the Mound transition efforts and also post-closure responsibilities at other DOE sites via a contract with the S.M. Stoller Corporation. The programmatic transfer from EM to LM is scheduled to take place on October 1, 2006. The transition of the Mound site has required substantial integration and coordination between the EM and LM. Several project management principles have been implemented to help facilitate the transfer of programmatic responsibility. As a result, several lessons learned have been identified to help streamline and improve integration and coordination of the transfer process. Lessons learned from the Mound site transition project are considered a work in progress and have been summarized according to a work breakdown structure for specific functional areas in the transition schedule. The functional areas include program management, environmental, records management, information technology, property management, stakeholder and regulatory relations, procurement, worker pension and benefits, and project closeout. Specific improvements or best practices have been recognized and documented by the Mound transition team. The Mound site is one of three major cleanup sites within the EM organization scheduled for completion in 2006. EM, EM cleanup contractor, LM, and LM post-closure contractor have identified lessons learned during the transition and closure of the Mound site. The transition effort from

  12. Security option file - After closure (DOS-AF)

    International Nuclear Information System (INIS)

    2016-01-01

    A first volume presents the context and scope of the Cigeo project, and the scope of this document. It proposes a general presentation of Cigeo, the regulatory framework and standards. It describes the different aspects and components of the security strategy: principles, security functions after closure, objectives of protection, global approach. It proposes a security assessment: objectives, consistency with international practices, assessment steps, scenarios, scenario quantitative assessment. The next part addresses security management. The second volume contains a description of the storage system: site characteristics, types of stored parcels, the future of the installation after its closure. The third volume proposes a security assessment. It addresses the management of risks and uncertainties, describes a scenario of normal evolution and also scenarios of altered evolutions, scenarios of unintentional human intrusion, and what-if type scenarios. The fourth volume reports lessons at the current stage of the project, and gives an overview of important activities from storage design to storage closure

  13. Management and integration of engineering and construction activities: Lessons learned from the AP1000R nuclear power plant China project

    International Nuclear Information System (INIS)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-01-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  14. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    Energy Technology Data Exchange (ETDEWEB)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  15. Lessons learnt from Ignalina NPP decommissioning project

    International Nuclear Information System (INIS)

    NAISSE, Jean-Claude

    2007-01-01

    The Ignalina Nuclear Power Plant (INPP) is located in Lithuania, 130 km north of Vilnius, and consists of two 1500 MWe RBMK type units, commissioned respectively in December 1983 and August 1987. On the 1. of May 2004, the Republic of Lithuania became a member of the European Union. With the protocol on the Ignalina Nuclear Power in Lithuania which is annexed to the Accession Treaty, the Contracting Parties have agreed: - On Lithuanian side, to commit closure of unit 1 of INPP before 2005 and of Unit 2 by 31 December 2009; - On European Union side, to provide adequate additional Community assistance to the efforts of Lithuania to decommission INPP. The paper is divided in two parts. The first part describes how, starting from this agreement, the project was launched and organized, what is its present status and which activities are planned to reach the final ambitious objective of a green field. To give a global picture, the content of the different projects that were defined and the licensing process will also be presented. In the second part, the paper will focus on the lessons learnt. It will explain the difficulties encountered to define the decommissioning strategy, considering both immediate or differed dismantling options and why the first option was finally selected. The paper will mention other challenges and problems that the different actors of the project faced and how they were managed and solved. The paper will be written by representatives of the Ignalina NPP and of the Project Management Unit. (author)

  16. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  17. LLNL/YMP Waste Container Fabrication and Closure Project

    International Nuclear Information System (INIS)

    1990-10-01

    The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) Program is studying Yucca Mountain, Nevada as a suitable site for the first US high-level nuclear waste repository. Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing and developing the waste package for the permanent storage of high-level nuclear waste. This report is a summary of the technical activities for the LLNL/YMP Nuclear Waste Disposal Container Fabrication and Closure Development Project. Candidate welding closure processes were identified in the Phase 1 report. This report discusses Phase 2. Phase 2 of this effort involved laboratory studies to determine the optimum fabrication and closure processes. Because of budget limitations, LLNL narrowed the materials for evaluation in Phase 2 from the original six to four: Alloy 825, CDA 715, CDA 102 (or CDA 122) and CDA 952. Phase 2 studies focused on evaluation of candidate material in conjunction with fabrication and closure processes

  18. Collecting lessons learned : How project-based organizations in the oil and gas industry learn from their projects

    NARCIS (Netherlands)

    Buttler, T.

    2016-01-01

    Project-based organizations collect lessons learned in order to improve the performance of projects. They aim to repeat successes by using positive lessons learned, and to avoid repeating negative experiences by using negative lessons learned. Cooke-Davies (2002) claimed that the ability to learn

  19. HIGH LEVEL WASTE TANK CLOSURE PROJECT AT THE IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY

    International Nuclear Information System (INIS)

    Quigley, K.D.; Wessman, D.

    2003-01-01

    tank -specific access interface devices have been integrated to provide a system that efficiently cleans tank walls and heel solids in an acidic, radioactive environment. Through the deployment of the tank cleaning system, the INEEL High Level Waste Program has cleaned tanks to meet RCRA clean closure standards and DOE closure performance measures. Design, development, and testing of tank grouting delivery equipment were completed in October 2002. The system incorporates lessons learned from closures at other DOE facilities. The grout will be used to displace the tank residuals remaining after the cleaning is complete. To maximize heel displacement to the discharge pump, grout was placed in a sequence of five positions utilizing two riser locations. The project is evaluating the use of six positions to optimize the residuals removed. After the heel has been removed and the residuals stabilized, the tank, piping, and secondary containment will be grouted

  20. A summary of lessons learned at the Shippingport Station Decommissioning Project (SSDP)

    International Nuclear Information System (INIS)

    Crimi, F.P.; Mullee, G.R.

    1987-10-01

    This paper describes the lessons learned from a management perspective during decommissioning. The lessons learned are presented in a chronological sequence during the life of the project up to the present time. The careful analysis of the lessons learned and the implementation of corresponding actions have contributed toward improving the effectiveness of decommissioning as time progresses. The lessons learned should be helpful in planning future decommissioning projects

  1. STATUS OF MECHANICAL SLUDGE REMOVAL AND COOLING COILS CLOSURE AT THE SAVANNAH RIVER SITE - F TANK FARM CLOSURE PROJECT - 9225

    Energy Technology Data Exchange (ETDEWEB)

    Jolly, R

    2009-01-06

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal using the Waste on Wheels (WOW) system within two of its storage tanks. The Waste on Wheels (WOW) system is designed to be relatively mobile with the ability for many components to be redeployed to multiple tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2839 cubic meters (750,000 gallons) each. In addition, Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. DOE intends to remove from service and operationally close Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. After obtaining regulatory approval, the tanks and cooling coils will be isolated and filled with grout for long term stabilization. Mechanical Sludge Removal of the remaining sludge waste within Tank 6 removed {approx} 75% of the original 25,000 gallons in August 2007. Utilizing lessons learned from Tank 6, Tank 5 Mechanical Sludge Removal completed removal of {approx} 90% of the original 125 cubic meters (33,000 gallons) of sludge material in May 2008. The successful removal of sludge material meets the requirement of approximately 19 to 28 cubic meters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. The Chemical Cleaning Process will utilize 8 wt% oxalic acid to dissolve the remaining sludge heel. The flow sheet for Chemical Cleaning planned a 20:1 volume ratio of acid to sludge for the first strike with mixing provided by the submersible mixer pumps. The subsequent strikes will utilize a 13:1 volume ratio of acid to sludge with no mixing. The results of the Chemical Cleaning Process are detailed in the &apos

  2. Lessons learned applying CASE methods/tools to Ada software development projects

    Science.gov (United States)

    Blumberg, Maurice H.; Randall, Richard L.

    1993-01-01

    This paper describes the lessons learned from introducing CASE methods/tools into organizations and applying them to actual Ada software development projects. This paper will be useful to any organization planning to introduce a software engineering environment (SEE) or evolving an existing one. It contains management level lessons learned, as well as lessons learned in using specific SEE tools/methods. The experiences presented are from Alpha Test projects established under the STARS (Software Technology for Adaptable and Reliable Systems) project. They reflect the front end efforts by those projects to understand the tools/methods, initial experiences in their introduction and use, and later experiences in the use of specific tools/methods and the introduction of new ones.

  3. Rocky flats closure project - lessons learned in worker stakeholder engagement

    International Nuclear Information System (INIS)

    Sweeney, Laura; Mazur, Robert E.; Edelson, Martin

    2013-01-01

    The Rocky Flats Environmental Technology Site (EPA Superfund site near Denver, Colorado) produced plutonium components for nuclear weapons for the U.S. defense program. The facility shut down in 1989 and clean up began in 1992. To ensure safe remediation of inactive nuclear sites, site owners have begun to consult stakeholders more widely in recent years. The closure of Rocky Flats aimed to set the standard for stakeholder involvement in doing the work safely, complying with regulations/standards, in a cost-effective manner. We have studied, using ethnographic methods, the extent to which workers at Rocky Flats were involved in communication and decision making strategies. Our results point out that workers can have perceptions of the site remediation process that differ from management and even other workers and that a significant number of workers questioned the commitment by management to engage the worker as stakeholder. The most effective remediation efforts should involve careful consideration of the insights and observations of all workers, particularly those who face immediate and high-level health and safety risks. (authors)

  4. Rocky flats closure project - lessons learned in worker stakeholder engagement

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, Laura [Des Moines Area Community College, Ankeny, Iowa (United States); Mazur, Robert E. [Iowa State University, Ames, Iowa (United States); Edelson, Martin [Ames Laboratory-USDOE (Retired), Ames, Iowa (United States)

    2013-07-01

    The Rocky Flats Environmental Technology Site (EPA Superfund site near Denver, Colorado) produced plutonium components for nuclear weapons for the U.S. defense program. The facility shut down in 1989 and clean up began in 1992. To ensure safe remediation of inactive nuclear sites, site owners have begun to consult stakeholders more widely in recent years. The closure of Rocky Flats aimed to set the standard for stakeholder involvement in doing the work safely, complying with regulations/standards, in a cost-effective manner. We have studied, using ethnographic methods, the extent to which workers at Rocky Flats were involved in communication and decision making strategies. Our results point out that workers can have perceptions of the site remediation process that differ from management and even other workers and that a significant number of workers questioned the commitment by management to engage the worker as stakeholder. The most effective remediation efforts should involve careful consideration of the insights and observations of all workers, particularly those who face immediate and high-level health and safety risks. (authors)

  5. A summary of lessons learned activities conducted at the OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    Hallbert, B.P.

    1997-01-01

    A series of lessons learned studies have been conducted at the OECD Halden Reactor Project. The purpose of these lessons learned reports are to summarize knowledge and experience gained across a number of research project. This paper presents a summary of main issues addressed in four of these lessons learned projects. These are concerned with software development and quality assurance, software reliability, methods for test and evaluation of developed systems, and the evaluation of system design features

  6. Closure report for CAU No. 416: Project Shoal Area

    International Nuclear Information System (INIS)

    1998-01-01

    This Closure Report provides the documentation for closure of the US Department of Energy/Nevada Operations Office (DOE/NV) Project Shoal Area (PSA) Surface Corrective Action Unit (CAU) 416. CAU 416 consists of a mud pit, muckpile, and housekeeping site. The PSA is located approximately 48.3 kilometers (30 miles) southeast of Fallon, Nevada. The mud pit was the result of drilling activities at the PSA in 1963. Investigation activities completed in 1996 determined drilling mud in the mud pit was impacted with petroleum hydrocarbons in excess of the State of Nevada 100 milligram per kilogram (mg/kg). The muckpile consists of broken granite from emplacement shaft and drift (tunnel) mining activities at the PSA in 1963. The housekeeping site consisted of approximately 20 used, empty, rusted, steel 0.9 liter (1 quart) oil cans

  7. ADVANTAGES, DISADVANTAGES, AND LESSONS LEARNED FROM MULTI-REACTOR DECOMMISSIONING PROJECTS

    International Nuclear Information System (INIS)

    Morton, M.R.; Nielson, R.R.; Trevino, R.A.

    2003-01-01

    This paper discusses the Reactor Interim Safe Storage (ISS) Project within the decommissioning projects at the Hanford Site and reviews the lessons learned from performing four large reactor decommissioning projects sequentially. The advantages and disadvantages of this multi-reactor decommissioning project are highlighted

  8. LLNL/YMP Waste Container Fabrication and Closure Project; GFY technical activity summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-10-01

    The Department of Energy`s Office of Civilian Radioactive Waste Management (OCRWM) Program is studying Yucca Mountain, Nevada as a suitable site for the first US high-level nuclear waste repository. Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing and developing the waste package for the permanent storage of high-level nuclear waste. This report is a summary of the technical activities for the LLNL/YMP Nuclear Waste Disposal Container Fabrication and Closure Development Project. Candidate welding closure processes were identified in the Phase 1 report. This report discusses Phase 2. Phase 2 of this effort involved laboratory studies to determine the optimum fabrication and closure processes. Because of budget limitations, LLNL narrowed the materials for evaluation in Phase 2 from the original six to four: Alloy 825, CDA 715, CDA 102 (or CDA 122) and CDA 952. Phase 2 studies focused on evaluation of candidate material in conjunction with fabrication and closure processes.

  9. Fabrication and closure development of nuclear waste disposal containers for the Yucca Mountain Project: Status report

    International Nuclear Information System (INIS)

    Domian, H.A.; Robitz, E.S.; Conrardy, C.C.; LaCount, D.F.; McAninch, M.D.; Fish, R.L.; Russell, E.W.

    1991-09-01

    In GFY 89, a project was underway to determine and demonstrate a suitable method for fabricating thin-walled monolithic waste containers for service within the potential repository at Yucca Mountain. A concurrent project was underway to determine and demonstrate a suitable closure process for these containers after they have been filled with high-level nuclear waste. Phase 1 for both the fabrication and closure projects was a screening phase in which candidate processes were selected for further laboratory testing in Phase 2. This report describes the final results of the Phase 1 efforts. It also describes the preliminary results of Phase 2 efforts

  10. Worldwide Overview of Lessons Learned from Decommissioning Projects

    International Nuclear Information System (INIS)

    Laraia, Michele

    2008-01-01

    With an increasing number of radioactive facilities and reactors now reaching the end of their useful life and being taken out of service, there is a growing emphasis worldwide on the safe and efficient decommissioning of such plants. There is a wealth of experience already gained in decommissioning projects for all kinds of nuclear facilities. It is now possible to compare and discuss progress and accomplishments worldwide. In particular, rather than on the factual descriptions of projects, technologies and case histories, it is important to focus on lessons learned: in this way, the return of experience is felt to effectively contribute to progress. Key issues - inevitably based on a subjective ranking - are presented in this paper. Through the exchange of lessons learned, it is possible to achieve full awareness of the need for resources for and constraints of safe and cost-effective decommissioning. What remains now is the identification of specific, remaining issues that may hinder or delay the smooth progress of decommissioning. To this end, lessons learned provide the necessary background information; this paper tries to make extensive use of practical experience gained by the international community

  11. SEL/Project Language. Level II, Kindergarten, Volume II (Lessons 17-32).

    Science.gov (United States)

    Valladares, Ann E.; And Others

    This curriculum guide contains the Southeastern Education Laboratory/Project Language Lessons 17-32 stressing listening, speaking, and reading readiness for disadvantaged kindergarten children. The lessons are designed to be used in the SEL's mobile preschool units or as readiness materials for kindergarten. The major emphasis of this intervention…

  12. Fernald - Developing and Executing an Accelerated Closure Plan

    International Nuclear Information System (INIS)

    Nixon, D.A.

    2006-01-01

    In November 2000 the Department of Energy (DOE) and Fluor Fernald entered into a closure contract that incited Fluor Fernald to reduce the cost and schedule of the Fernald site cleanup. The contract established a target schedule and target cost and how Fluor Fernald performs against these targets determines the amount of fee the company earns. In response to these new challenges, Fluor Fernald developed a 13-part strategy to safely accelerate work and more efficiently utilize the available funding. Implementation of this strategy required a dramatic culture change at Fernald - from a 'government job mind set' to an entrepreneurial/commercial model. Fluor Fernald's strategy and culture change has proved to be successful as the company is on track to close the site ahead of the target schedule at a total project cost less than the target cost. The elements of Fluor Fernald's strategy and the lessons learned during implementation provide valuable information that could be utilized by other DOE sites that will be undergoing closure over the next decade. (authors)

  13. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  14. LESSONS LEARNED IN OPERATING THE HOSE-IN-HOSE SYSTEM FOR TRANSFSERRING SLUDGE AT HANFORD'S K BASINS

    International Nuclear Information System (INIS)

    PERES MW

    2008-01-01

    In May 2007, the Department of Energy and the Fluor Hanford K Basin Closure Project completed transferring sludge from the K East Basin to new containers in the K West Basin using a Hose-in-Hose system. This project presented a number of complex and unique technical, operational, and management challenges that had to be resolved to complete the required transfers and satisfy project milestones. The project team (including DOE; regulators; and Fluor management, operations, maintenance, engineering and all other support organizations) found innovative solutions to each challenge. This paper records lessons learned during the operational phase of the sludge transfer via the Hose-In-Hose system. The subject is limited to the operational phase and does not cover design, development, testing or turnover. A discussion of the situation or problem encountered is provided, along with the lesson learned as applicable to a future program or project

  15. How the Lean Management System is Working on a Closure Project - 13242

    Energy Technology Data Exchange (ETDEWEB)

    Mowery, Carol [Washington Closure Hanford, 2620 Fermi, Richland, Washington, 99354 (United States)

    2013-07-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  16. How the Lean Management System is Working on a Closure Project - 13242

    International Nuclear Information System (INIS)

    Mowery, Carol

    2013-01-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  17. QA lessons learned for parameter control from the WIPP Project

    International Nuclear Information System (INIS)

    Richards, R.R.

    1998-01-01

    This paper provides a summary of lessons learned from experiences on the Waste Isolation Pilot Plant (WJPP) Project in implementation of quality assurance controls surrounding inputs for performance assessment analysis. Since the performance assessment (PA) process is inherent in compliance determination for any waste repository, these lessons-learned are intended to be useful to investigators, analysts, and Quality Assurance (QA) practitioners working on high level waste disposal projects. On the WIPP Project, PA analyses for regulatory-compliance determination utilized several inter-related computer programs (codes) that mathematically modeled phenomena such as radionuclide release, retardation, and transport. The input information for those codes are the parameters that are the subject of this paper. Parameters were maintained in a computer database, which was then queried electronically by the PA codes whenever input was needed as the analyses were run

  18. Project scoping for lessons learnt to apply to the Celtic Seas marine sub-region

    OpenAIRE

    Twomey, Sarah; O'Mahony, Cathal

    2013-01-01

    This report involves a formal scoping exercise to identify lessons from a wide range of previous and current project and initiative experiences at the national, regional seas, European and global levels. An inventory of 77 projects and initiatives that are relevant with regard to the key activities proposed by the Celtic Seas Partnership has been compiled, as well as a short-list of 23 of the most pertinent projects, lessons learnt and contact names. This report has identified a number of syn...

  19. Educating for Freedom and Responsibility: Lessons From the First Amendment Schools Project

    Science.gov (United States)

    Mitchell, Cynthia

    2016-01-01

    The First Amendment Schools project holds rich lessons in how to change school cultures into "laboratories of democracy"--as well as in how to increase the odds of success for any school reform effort. School reform programs of any sort need to make sure to build in sustainability, to provide ways to spread their lessons beyond the…

  20. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    Energy Technology Data Exchange (ETDEWEB)

    Finley, Robert [Univ. of Illinois, Champaign, IL (United States); Payne, William [Schlumberger Carbon Services, Houston, TX (United States); Kirksey, Jim [Univ. of Illinois, Champaign, IL (United States)

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  1. Transportable Vitrification System RCRA Closure Practical Waste Disposition Saves Time And Money

    International Nuclear Information System (INIS)

    Brill, Angie; Boles, Roger; Byars, Woody

    2003-01-01

    The Transportable Vitrification System (TVS) was a large-scale vitrification system for the treatment of mixed wastes. The wastes contained both hazardous and radioactive materials in the form of sludge, soil, and ash. The TVS was developed to be moved to various United States Department of Energy (DOE) facilities to vitrify mixed waste as needed. The TVS consists of four primary modules: (1) Waste and Additive Materials Processing Module; (2) Melter Module; (3) Emissions Control Module; and (4) Control and Services Module. The TVS was demonstrated at the East Tennessee Technology Park (ETTP) during September and October of 1997. During this period, approximately 16,000 pounds of actual mixed waste was processed, producing over 17,000 pounds of glass. After the demonstration was complete it was determined that it was more expensive to use the TVS unit to treat and dispose of mixed waste than to direct bury this waste in Utah permitted facility. Thus, DOE had to perform a Resource Conservation and Recovery Act (RCRA) closure of the facility and find a reuse for as much of the equipment as possible. This paper will focus on the following items associated with this successful RCRA closure project: TVS site closure design and implementation; characterization activities focused on waste disposition; pollution prevention through reuse; waste minimization efforts to reduce mixed waste to be disposed; and lessons learned that would be integrated in future projects of this magnitude

  2. Closure requirements

    International Nuclear Information System (INIS)

    Hutchinson, I.P.G.; Ellison, R.D.

    1992-01-01

    Closure of a waste management unit can be either permanent or temporary. Permanent closure may be due to: economic factors which make it uneconomical to mine the remaining minerals; depletion of mineral resources; physical site constraints that preclude further mining and beneficiation; environmental, regulatory or other requirements that make it uneconomical to continue to develop the resources. Temporary closure can occur for a period of several months to several years, and may be caused by factors such as: periods of high rainfall or snowfall which prevent mining and waste disposal; economic circumstances which temporarily make it uneconomical to mine the target mineral; labor problems requiring a cessation of operations for a period of time; construction activities that are required to upgrade project components such as the process facilities and waste management units; and mine or process plant failures that require extensive repairs. Permanent closure of a mine waste management unit involves the provision of durable surface containment features to protect the waters of the State in the long-term. Temporary closure may involve activities that range from ongoing maintenance of the existing facilities to the installation of several permanent closure features in order to reduce ongoing maintenance. This paper deals with the permanent closure features

  3. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    Science.gov (United States)

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  4. Lessons Learned and Flight Results from the F15 Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John

    2006-01-01

    A viewgraph presentation on the lessons learned and flight results from the F15 Intelligent Flight Control System (IFCS) project is shown. The topics include: 1) F-15 IFCS Project Goals; 2) Motivation; 3) IFCS Approach; 4) NASA F-15 #837 Aircraft Description; 5) Flight Envelope; 6) Limited Authority System; 7) NN Floating Limiter; 8) Flight Experiment; 9) Adaptation Goals; 10) Handling Qualities Performance Metric; 11) Project Phases; 12) Indirect Adaptive Control Architecture; 13) Indirect Adaptive Experience and Lessons Learned; 14) Gen II Direct Adaptive Control Architecture; 15) Current Status; 16) Effect of Canard Multiplier; 17) Simulated Canard Failure Stab Open Loop; 18) Canard Multiplier Effect Closed Loop Freq. Resp.; 19) Simulated Canard Failure Stab Open Loop with Adaptation; 20) Canard Multiplier Effect Closed Loop with Adaptation; 21) Gen 2 NN Wts from Simulation; 22) Direct Adaptive Experience and Lessons Learned; and 23) Conclusions

  5. Lessons learned from decommissioning projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Salazar, M.

    1995-01-01

    This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste management; the National Environmental Policy Act (NEPA); the Resource Conservation and Recovery Act (RCRA); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); contracting; public involvement; client/customer interface; and funding. Key elements of our approach are to be proactive; follow the observation method; perform field activities concurrently; develop strategies to keep reportable incidents from delaying work; seek and use programs, methods, etc., in existence to shorten learning curves; network to help develop solutions; and avoid overstudying and overcharacterizing. This approach results in preliminary plans that require very little revision before implementation, reasonable costs and schedules, early acquisition of permits and NEPA documents, preliminary characterization reports, and contracting documents. Our track record is good -- the last four projects (uranium and plutonium-processing facility and three research reactors) have been on budget and on schedule

  6. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L., E-mail: m.freire.gormaly@utoronto.ca, E-mail: antonio.gittens@mail.utoronto.ca, E-mail: lavender.zhang@outlook.com [University of Toronto, Toronto, ON (Canada)

    2015-07-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  7. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    International Nuclear Information System (INIS)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L.

    2015-01-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  8. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  9. A Text Mining Approach for Extracting Lessons Learned from Project Documentation: An Illustrative Case Study

    Directory of Open Access Journals (Sweden)

    Benjamin Matthies

    2017-12-01

    Full Text Available Lessons learned are important building blocks for continuous learning in project-based organisations. Nonetheless, the practical reality is that lessons learned are often not consistently reused for organisational learning. Two problems are commonly described in this context: the information overload and the lack of procedures and methods for the assessment and implementation of lessons learned. This paper addresses these problems, and appropriate solutions are combined in a systematic lesson learned process. Latent Dirichlet Allocation is presented to solve the first problem. Regarding the second problem, established risk management methods are adapted. The entire lessons learned process will be demonstrated in a practical case study

  10. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  11. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order; TOPICAL

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system

  12. Necessary and Sufficient Standards Closure Process pilot: F- and H-Area groundwater remediation

    International Nuclear Information System (INIS)

    Bullington, M.

    1995-01-01

    The DOE Standards Committee's Necessary and Sufficient (N and S) Standards Closure Process was piloted at SRS on the F- and H- Area Seepage Basins Groundwater Remediation Project. For this existing Environmental Restoration project, the set of N and S standards for design and safety documentation were identified, independently confirmed and approved. Implementation of these standards on the project can lead to a $2.8 Million cost savings on the design, construction/installation, and safety documentation scope of $18 Million. These savings were primarily from site design of power distribution and piping for the water treatment units. Also contributing to the savings were a more appropriate level of safety documentation and the alternate ''commercial'' bids made by vendors in response to a request for proposals for water treatment units. The use of the N and S Process on an ER activity, details on the cost savings, lessons learned and recommendations for broader implementation of the N and S Process are described herein

  13. West Valley Demonstration Project, Waste Management Area #3 -- Closure Alternative I

    Energy Technology Data Exchange (ETDEWEB)

    Marschke, Stephen F. [Environmental Measurements Laboratory (EML), New York, NY (United States)

    2000-06-30

    The Draft Environmental Impact Statement for the completion of the West Valley Demonstration Project and closure and/or long-term management of facilities at the Western New York Nuclear Service Center divided the site into Waste Management Areas (WMAs), and for each WMA, presented the impacts associated with five potential closure alternatives. This report focuses on WMA 3 (the High-Level Waste (HLW) Storage Area (Tanks 8D-1 and 8D-2), the Vitrification Facility and other facilities) and closure Alternative I (the complete removal of all structures, systems and components and the release of the area for unrestricted use), and reestimates the impacts associated with the complete removal of the HLW tanks, and surrounding facilities. A 32-step approach was developed for the complete removal of Tanks 8D-1 and 8D-2, the Supernatant Treatment System Support Building, and the Transfer Trench. First, a shielded Confinement Structure would be constructed to reduce the shine dose rate and to control radioactivity releases. Similarly, the tank heels would be stabilized to reduce potential radiation exposures. Next, the tank removal methodology would include: 1) excavation of the vault cover soil, 2) removal of the vault roof, 3) cutting off the tank’s top, 4) removal of the stabilized heel remaining inside the tank, 5) cutting up the tank’s walls and floor, 6) removal of the vault’s walls, the perlite blocks, and vault floor, and 7) radiation surveying and backfilling the resulting hole. After the tanks are removed, the Confinement Structure would be decontaminated and dismantled, and the site backfilled and landscaped. The impacts (including waste disposal quantities, emissions, work-effort, radiation exposures, injuries and fatalities, consumable materials used, and costs) were estimated based on this 32 step removal methodology, and added to the previously estimated impacts for closure of the other facilities within WMA 3 to obtain the total impacts from

  14. Lessons learned about coordinating academic partnerships from an international network for health education.

    Science.gov (United States)

    Luo, Airong; Omollo, Kathleen Ludewig

    2013-11-01

    There is a growing trend of academic partnerships between U.S., Canadian, and European health science institutions and academic health centers in low- and middle-income countries. These partnerships often encounter challenges such as resource disparities and power differentials, which affect the motivations, expectations, balance of benefits, and results of the joint projects. Little has been discussed in previous literature regarding the communication and project management processes that affect the success of such partnerships. To fill the gap in the literature, the authors present lessons learned from the African Health Open Educational Resources Network, a multicountry, multiorganizational partnership established in May 2008. The authors introduce the history of the network, then discuss actively engaging stakeholders throughout the project's life cycle (design, planning, execution, and closure) through professional development, relationship building, and assessment activities. They focus on communication and management practices used to identify mutually beneficial project goals, ensure timely completion of deliverables, and develop sustainable sociotechnical infrastructure for future collaborative projects. These activities yielded an interactive process of action, assessment, and reflection to ensure that project goals and values were aligned with implementation. The authors conclude with a discussion of lessons learned and how the partnership project may serve as a model for other universities and academic health centers in high-income countries and low- and middle-income countries that are interested in or currently pursuing international academic partnerships.

  15. A successful environmental remediation program closure and post-closure activities (CAPCA) Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Bowers, M.H.

    1991-01-01

    The Resource Conservation and Recovery Act (RCRA) closure of eleven waste management units at the Department of Energy's (DOE's) Oak Ridge Y-12 Plant is nearing completion. The Oak Ridge Y-12 Plant is managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy under Contract DE-AC05-84OR21400. The Closure and Post Closure Program (CAPCA) has been accomplished on an accelerated schedule through the efforts of a dedicated team from several organizations. This paper relates experience gained from the program that can be of benefit on other DOE environmental remediation projects. Technical design and construction aspects, as well as project management considerations, are discussed

  16. Breaking the deadlock: lessons from cross-border spatial projects in Flanders and the Netherlands

    NARCIS (Netherlands)

    de Vries, J.

    2008-01-01

    This paper explores the specific characteristics of decision-making in cross-border spatial projects and draws some lessons for European territorial cooperation. This is done by examining three major infrastructure projects between the Netherlands and Flanders: the construction of a high-speed rail

  17. Project management approach for the Waste Area Grouping 6 Closure/Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document has been developed as a preliminary definition of the Waste Area Grouping (WAG) 6 Closure Project Management Approach. The purpose of this document is to identify the roles and responsibilities of the various project team members and to identify the project scope, schedule and budget. This document is intended to be a living document. As information develops, this document will be revised to create a WAG 6 Project Management Plan (PMP). The PMP will provide additional focus to the information contained in this document. The information required will be available as the selected alternative for remediation of WAG 6 is approved and Remedial Action Plans are conceptualized. This document has been reviewed against, and is intended to be consistent with, the Environmental Restoration Program Management Plan

  18. Closure and Sealing Design Calculation

    International Nuclear Information System (INIS)

    T. Lahnalampi; J. Case

    2005-01-01

    The purpose of the ''Closure and Sealing Design Calculation'' is to illustrate closure and sealing methods for sealing shafts, ramps, and identify boreholes that require sealing in order to limit the potential of water infiltration. In addition, this calculation will provide a description of the magma that can reduce the consequences of an igneous event intersecting the repository. This calculation will also include a listing of the project requirements related to closure and sealing. The scope of this calculation is to: summarize applicable project requirements and codes relating to backfilling nonemplacement openings, removal of uncommitted materials from the subsurface, installation of drip shields, and erecting monuments; compile an inventory of boreholes that are found in the area of the subsurface repository; describe the magma bulkhead feature and location; and include figures for the proposed shaft and ramp seals. The objective of this calculation is to: categorize the boreholes for sealing by depth and proximity to the subsurface repository; develop drawing figures which show the location and geometry for the magma bulkhead; include the shaft seal figures and a proposed construction sequence; and include the ramp seal figure and a proposed construction sequence. The intent of this closure and sealing calculation is to support the License Application by providing a description of the closure and sealing methods for the Safety Analysis Report. The closure and sealing calculation will also provide input for Post Closure Activities by describing the location of the magma bulkhead. This calculation is limited to describing the final configuration of the sealing and backfill systems for the underground area. The methods and procedures used to place the backfill and remove uncommitted materials (such as concrete) from the repository and detailed design of the magma bulkhead will be the subject of separate analyses or calculations. Post-closure monitoring will not

  19. Designing a lessons learned model to improve the success of new product development in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad

    2016-12-01

    Full Text Available Nowadays, project-based organizations need to utilize intellectual capital and knowledge to become leader in their business activities. The new approach to use knowledge based skills from one side and development of the new complicated products from the other side have increased the need for designing a lessons learned model. The purpose of this paper is to design a lessons learned model to improve the success of new product development for project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 56 experts who were well informed about various techniques of new product development and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The results of the survey have indicated that there were positive and meaningful relationships between lessons learned components and the success of the new product development.

  20. HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

    International Nuclear Information System (INIS)

    Jolly, R; Bruce Martin, B

    2008-01-01

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intraarea

  1. HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jolly, R; Bruce Martin, B

    2008-01-15

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple

  2. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  3. Lessons learned: Managing the development of a corporate Ada training project

    Science.gov (United States)

    Blackmon, Linda F.

    1986-01-01

    The management lessons learned during the implementation of a corporate mandate to develop and deliver an effective Ada training program to all divisions are discussed. The management process involved in obtaining cooperation from all levels in the development of a corporate-wide project is described. The problem areas are identified along with some possible solutions.

  4. Femoral Artery Stenosis Following Percutaneous Closure Using a Starclose Closure Device

    International Nuclear Information System (INIS)

    Bent, Clare Louise; Kyriakides, Constantinos; Matson, Matthew

    2008-01-01

    Starclose (Abbott Vascular Devices, Redwood City, CA) is a new arterial closure device that seals a femoral puncture site with an extravascular star-shaped nitinol clip. The clip projects small tines into the arterial wall which fold inward, causing the arterial wall to pucker, producing a purse-string-like seal closing the puncture site. The case history is that of a 76-year-old female patient who underwent day-case percutaneous diagnostic coronary angiography. A Starclose femoral artery closure device was used to achieve hemostasis with subsequent femoral artery stenosis.

  5. Good Practice Lessons from the Urban Traffic Project, Denmark

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    In 1990, as the first government in the world, the Danish Cabinet approved a national action plan for sustainable transport. In 1992, as part of the implementation of this plan, the Urban Traffic Project was set up with the EPA. The policy situation was one of a state agency trying to motivate...... urban municipalities to work with T&E (transport and environment) integration, i.e. integration of concerns for safety, energy, air quality, noise etc. in urban traffic planning. 50 major urban municipalities participated in the project. The most important lessons to be learned from the project are: (1......) With a fairly modest investment (DKK 150 million in seed money) it has been possible on a voluntary basis to motivate the majority of urban municipalities to work with T&E integration. (2) The top motivating factor for municipalities to participate was a desire for organisational and professional learning. (3...

  6. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    Energy Technology Data Exchange (ETDEWEB)

    Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

    2011-09-01

    Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  7. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  8. Experience in Use of Project Method during Technology Lessons in Secondary Schools of the USA

    Science.gov (United States)

    Sheludko, Inna

    2015-01-01

    The article examines the opportunities and prospects for the use of experience of project method during "technology lessons" in US secondary schools, since the value of project technology implementation experience into the educational process in the USA for ensuring holistic development of children, preparing them for adult life, in…

  9. Comparing over-the-scope clip versus endoloop and clips (KING closure) for access site closure: a randomized experimental study

    Czech Academy of Sciences Publication Activity Database

    Martínek, J.; Ryska, O.; Tučková, I.; Filípková, T.; Doležel, R.; Juhás, Štefan; Motlík, Jan; Zavoral, M.; Ryska, M.

    2013-01-01

    Roč. 27, č. 4 (2013), s. 1203-1210 ISSN 0930-2794 R&D Projects: GA MZd NS9994 Institutional research plan: CEZ:AV0Z50450515 Keywords : NOTES * gastrotomy closure * rectotomy closure Subject RIV: FJ - Surgery incl. Transplants Impact factor: 3.313, year: 2013

  10. Modern Project: monitoring developments for safe repository operation and staged closure

    International Nuclear Information System (INIS)

    Mayer, S.; Ouchhi, S.; Verstricht, J.; Maurer, H.; Breen, B.

    2010-01-01

    Document available in extended abstract form only. In a first part, the overall objectives of the MoDeRn project (Monitoring Developments for safe Repository operation and stage closure project) are presented. MoDeRn is a four year (2009-2013) collaborative project co-funded under the 7. Framework Program for Nuclear Research and Training (EURATOM). It involves 17 organizations responsible for research into radioactive waste management in the European Union, United States, Japan and Switzerland, with partners with extensive experience in monitoring activities in underground research laboratories (URL); as well as research institutes and universities with substantial experience in research on socio-technical interactions and public and stakeholder engagement. An overview of the project work packages and of their interdependencies is given. The successful implementation of a repository program for radioactive waste relies on both the technical aspects of a sound safety strategy and scientific and engineering excellence as well as on social aspects such as stakeholder acceptance and confidence. Monitoring is considered key in serving both technical and social objectives. It is not only essential to underpin the technical safety strategy and quality of the engineering, but it can also be an important tool for public communication, contributing to public understanding of and confidence in the repository behaviour. By inclusion of specific national contexts of waste management programs in different countries, the MoDeRn project aims at providing a reference framework for development and implementation of monitoring activities. This will be achieved by stakeholder engagement during all identifiable phases of the radioactive waste disposal process. Thus, site characterisation, construction, operation and staged closure, as well as post-closure institutional control phases have to be addressed. MoDeRn considers different host rock types, such as salt, tuff, crystalline rock

  11. [Managing digital medical imaging projects in healthcare services: lessons learned].

    Science.gov (United States)

    Rojas de la Escalera, D

    2013-01-01

    Medical imaging is one of the most important diagnostic instruments in clinical practice. The technological development of digital medical imaging has enabled healthcare services to undertake large scale projects that require the participation and collaboration of many professionals of varied backgrounds and interests as well as substantial investments in infrastructures. Rather than focusing on systems for dealing with digital medical images, this article deals with the management of projects for implementing these systems, reviewing various organizational, technological, and human factors that are critical to ensure the success of these projects and to guarantee the compatibility and integration of digital medical imaging systems with other health information systems. To this end, the author relates several lessons learned from a review of the literature and the author's own experience in the technical coordination of digital medical imaging projects. Copyright © 2012 SERAM. Published by Elsevier Espana. All rights reserved.

  12. Loop Ileostomy Closure as an Overnight Procedure: Institutional Comparison With the National Surgical Quality Improvement Project Data Set.

    Science.gov (United States)

    Berger, Nicholas G; Chou, Raymond; Toy, Elliot S; Ludwig, Kirk A; Ridolfi, Timothy J; Peterson, Carrie Y

    2017-08-01

    Enhanced recovery pathways have decreased length of stay after colorectal surgery. Loop ileostomy closure remains a challenge, because patients experience high readmission rates, and validation of enhanced recovery pathways has not been demonstrated. This study examined a protocol whereby patients were discharged on the first postoperative day and instructed to advance their diet at home with close telephone follow-up. The hypothesis was that patients can be safely discharged the day after loop closure, leading to shorter length of stay without increased rates of readmission or complications. Patients undergoing loop ileostomy closure were queried from the American College of Surgeons National Surgical Quality Improvement Project and compared with a single institution (2012-2015). Length of stay, 30-day readmission, and 30-day morbidity data were analyzed. The study was conducted at a tertiary university department. The study includes 1602 patients: 1517 from the National Surgical Quality Improvement Project database and 85 from a single institution. Length of stay and readmission rates were measured. Median length of stay was less at the single institution compared with control (2 vs 4 d; p < 0.001). Thirty-day readmission (15.3% vs 10.4%; p = 0.15) and overall 30-day complications (15.3% vs 16.7%; p = 0.73) were similar between cohorts. Estimated adjusted length of stay was less in the single institution (2.93 vs 5.58 d; p < 0.0001). There was no difference in the odds of readmission (p = 0.22). The main limitations of this study include its retrospective nature and limitations of the National Surgical Quality Improvement Program database. Next-day discharge with protocoled diet advancement and telephone follow-up is acceptable after loop ileostomy closure. Patients can benefit from decreased length of stay without an increase in readmission or complications. This has the potential to change the practice of postoperative management of loop ileostomy closure, as

  13. Getting to Gender Equality in Energy Infrastructure : Lessons from Electricity Generation, Transmission, and Distribution Projects

    OpenAIRE

    Orlando, Maria Beatriz; Janik, Vanessa Lopes; Vaidya, Pranav; Angelou, Nicolina; Zumbyte, Ieva; Adams, Norma

    2018-01-01

    Getting to Gender Equality in Electricity Infrastructure: Lessons from Electricity Generation, Transmission, and Distribution Projects examines the social and gender footprint of large-scale electricity generation, transmission, and distribution projects to establish a foundation on which further research and replication of good practices can be built. The main impact pathways analyzed are...

  14. Crowdfunding Astronomy Outreach Projects: Lessons learned from the UNAWE crowdfunding campaign

    Science.gov (United States)

    Ashton, A. J., Heenatigala, T.; Russo, P.

    2014-12-01

    In recent years, crowdfunding has become a popular method of funding new technology or entertainment products, or artistic projects. The idea is that people or projects ask for many small donations from individuals who support the proposed work, rather than a large amount from a single source. Crowdfunding is usually done via an online portal or platform which handles the financial transactions involved. The Universe Awareness (UNAWE) programme decided to undertake a Kickstarter1 crowdfunding campaign centring on the resource Universe in a Box. In this article we present the lessons learned and best practices from that campaign.

  15. Waste Dump Closure and Cost Estimates at AngloGold Ashanti ...

    African Journals Online (AJOL)

    Michael

    2017-12-02

    Dec 2, 2017 ... 2University of Mines and Technology, P.O. Box 237, Tarkwa, Ghana ... The mine has closure plans for the waste dumps and the closure activity ... incur additional cost, it was advised that the mine should execute the closure and reclamation plan without delay. .... Progressively rehabilitate the project area.

  16. The German Chernobyl project: Lessons learned

    International Nuclear Information System (INIS)

    Hill, P.; Hille, R.

    1999-01-01

    This report presents results and lessons learned by one of the so far largest assessments of a post-accidental situation. Funded by the Federal Republic of Germany the German Chernobyl Project investigated in the years 1991-1993 the radiological situation in contaminated regions of the Russian Federation, Belarus and Ukraine. Measurements included a mass screening of the population in order to determine the Cesium body burdens of 250,000+ individuals in more than 240 settlements as well as the evaluation of external doses in selected settlements with soil contaminations varying from less than 74 kBq/m 2 to about 3700 kBq/m 2 including some, where decontamination measures had previously been taken. Also in many settlements environmental monitoring was undertaken. For most individuals doses did not exceed the international annual limits set for the general population. Open and comprehensive communication of results was favourably accepted by the public. In a few settlements the radiological situation has been followed up till to date. (author)

  17. Social learning in transnational projectslessons from European territorial cooperation projects

    Directory of Open Access Journals (Sweden)

    Joern Harfst

    2015-04-01

    Full Text Available Old industrial regions in Europe have undergone radical changes in the last decades. After downsizing or closure of predominant industries such regions usually face big challenges concerning their economic, social and ecological futures. One chance to master this transformation process is the identification and sustainable utilisation of potentials left by industrial production. Utilisation of regional potentials, commonly categorized as natural and cultural potentials, was the aim of two transnational cooperation projects ReSource and SHIFT-X, which were both funded by European Union’s Development Fund (ERDF, INTERREG IVB. The paper shows how the involvement of research partners in the projects supported and facilitated joint learning effects and knowledge transfer between all project partners. It is argued that on the one hand such an approach offers important mutual benefits for partners, while on the other hand the realisation of such benefits remains a challenging task in a transnational collaboration. In declining industrial regions, especially when characterised by small- and medium-sized towns, the capacities to act are scarce and any outside intervention is often seen more as an unwanted factor that additionally stretches resources and provides little advantages for such regions. Therefore one of the main aims in transnational collaboration has to be the establishment of a trustful and committed working relation between all partners. The engagement in the projects has shown that the joint work between regional actors and the external academic partners can create important transnational learning effects for all involved; nevertheless it has to overcome certain reservations on all sides before innovative ways can be pursued successfully.

  18. Lessons Learned Report for the radioactive mixed waste land disposal facility (Trench 31, Project W-025)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1995-01-01

    This report presents the lessons learned from a project that involved modification to the existing burial grounds at the Hanford Reservation. This project has been focused on the development and operation of a Resource Conservation and Recovery Act compliant landfill which will accept low-level radioactive wastes that have been placed in proper containers

  19. Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.

    Energy Technology Data Exchange (ETDEWEB)

    Tillman, Jack B.

    2008-09-01

    In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

  20. Project LEAN--lessons learned from a national social marketing campaign.

    Science.gov (United States)

    Samuels, S E

    1993-01-01

    The Henry J. Kaiser Family Foundation initiated a social marketing campaign in 1987 to reduce the nation's risk for heart disease and some cancers. Consensus on recommendations for dietary change have stimulated the development of a variety of social marketing campaigns to promote behavior change. Project LEAN (Low-Fat Eating for America Now) is a national campaign whose goal is to reduce dietary fat consumption to 30 percent of total calories through public service advertising, publicity, and point-of-purchase programs in restaurants, supermarkets, and school and worksite cafeterias. The public service advertising reached 50 percent of the television viewing audience and the print publicity, more than 35 million readers. The toll-free hotline received more than 300,000 calls. Thirty-four organizations joined the foundation in partnership and raised $350,000 for collaborative activities. Thirteen States implemented local campaigns. Lessons have been learned about the use of the media, market segmentation, effective spokespersons, and successful partnerships. These lessons will be valuable to others planning social marketing campaigns on nutrition and other preventive behaviors.

  1. Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

    Science.gov (United States)

    Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.

    1993-01-01

    The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

  2. Design, Implementation, and Lessons Learned from a Digital Storytelling Project in an Undergraduate Health Promotion Theory Course

    Science.gov (United States)

    Rimando, Marylen; Smalley, K. Bryant; Warren, Jacob C.

    2015-01-01

    This article describes the design, implementation and lessons learned from a digital storytelling project in a health promotion theory course. From 2011-2012, 195 health promotion majors completed a digital storytelling project at a Midwestern university. The instructor observed students' understanding of theories and models. This article adds to…

  3. Value pricing pilot program : lessons learned

    Science.gov (United States)

    2008-08-01

    This "Lessons Learned Report" provides a summary of projects sponsored by the Federal Highway Administration's (FHWA's) Congestion and Value Pricing Pilot Programs from 1991 through 2006 and draws lessons from a sample of projects with the richest an...

  4. Geocuration Lessons Learned from the Climate Data Initiative Project

    Science.gov (United States)

    Ramachandran, Rahul; Bugbee, Kaylin; Tilmes, Curt; Pinheiro Privette, Ana

    2015-01-01

    Curation is traditionally defined as the process of collecting and organizing information around a common subject matter or a topic of interest and typically occurs in museums, art galleries, and libraries. The task of organizing data around specific topics or themes is a vibrant and growing effort in the biological sciences but to date this effort has not been actively pursued in the Earth sciences. This presentation will introduce the concept of geocuration, which we define it as the act of searching, selecting, and synthesizing Earth science data/metadata and information from across disciplines and repositories into a single, cohesive, and useful compendium. We also present the Climate Data Initiative (CDI) project as an prototypical example. The CDI project is a systematic effort to manually curate and share openly available climate data from various federal agencies. CDI is a broad multi-agency effort of the U.S. government and seeks to leverage the extensive existing federal climate-relevant data to stimulate innovation and private-sector entrepreneurship to support national climate change preparedness. The geocuration process used in the CDI project, key lessons learned, and suggestions to improve similar geocuration efforts in the future will be part of this presentation.

  5. Geocuration Lessons Learned from the Climate Data Initiative Project

    Science.gov (United States)

    Ramachandran, R.; Bugbee, K.; Tilmes, C.; Privette, A. P.

    2015-12-01

    Curation is traditionally defined as the process of collecting and organizing information around a common subject matter or a topic of interest and typically occurs in museums, art galleries, and libraries. The task of organizing data around specific topics or themes is a vibrant and growing effort in the biological sciences but to date this effort has not been actively pursued in the Earth sciences. This presentation will introduce the concept of geocuration, which we define it as the act of searching, selecting, and synthesizing Earth science data/metadata and information from across disciplines and repositories into a single, cohesive, and useful compendium.We also present the Climate Data Initiative (CDI) project as an exemplar example. The CDI project is a systematic effort to manually curate and share openly available climate data from various federal agencies. CDI is a broad multi-agency effort of the U.S. government and seeks to leverage the extensive existing federal climate-relevant data to stimulate innovation and private-sector entrepreneurship to support national climate-change preparedness. The geocuration process used in CDI project, key lessons learned, and suggestions to improve similar geocuration efforts in the future will be part of this presentation.

  6. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    Nirider, L. Tom

    2003-08-06

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D&D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D&D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D&D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D&D activities. A reference section is included to provide additional information. This document does not address D&D lessons learned that are not pertinent to criticality safety.

  7. K-12 Phenology Lessons for the Phenocam Project

    Science.gov (United States)

    Bennett, K. F.

    2013-12-01

    Phenology is defined as periodic [or annual] life cycles of plants and animals driven by seasonal environmental changes. Climate change impinges a strong effect on phenology, potentially altering the structure and functioning of ecosystems. In the fall of 2011, the Ashburnham-Westminster Regional School District became the first of five schools to join Harvard University's Phenocam Network with the installation of a webcam to monitor phenology (or 'phenocam') at Overlook Middle School in Ashburnham, Massachusetts. Our school district is now part of a network of near-surface remote sensing phenocams that capture and send images of forest, shrub, and grassland vegetation cover at more than 130 diverse sites in North America. Our phenocam provides a digital image every half hour of the mixed forest canopy north from the school, enabling the detection of changes in canopy development, quantified as canopy 'greenness'. As a part of the Phenocam project, students at the K-12 level have expanded the scope of phenological monitoring protocol that is part of the Harvard Forest Schoolyard Ecology Program, Buds, Leaves, and Global Warming. In this protocol, students work with ecologists at Harvard Forest to monitor buds and leaves on schoolyard trees to determine the length of the growing season, giving them the opportunity to be a part of real and important research concerning the critical environmental issue of climate change. Students involved in the Buds, Leaves, and Global Warming study have the opportunity to compare their ground data on budburst, color change, and leaf drop to the phenocam images, as well as to similar forested sites in locations throughout the United States. Lessons have been developed for comparing student data to phenocam images, canopy greenness time series graphs extracted from the images, and satellite data. Lessons addressing map scale and the Urban Heat Island effect will also be available for teachers. This project will greatly enhance the

  8. Regenesys utility scale energy storage. Project summary

    International Nuclear Information System (INIS)

    2004-01-01

    This report summarises the work to date, the current situation and the future direction of a project carried out by Regenesys Technology Ltd. (RGN) to investigate the benefits of electrochemical energy storage for power generators using renewable energy sources focussing on wind energy. The background to the study is traced covering the progress of the Regenesys energy storage technology, and the milestones achieved and lessons learnt. Details are given of the planned renewable-store-market interface to allow renewable generators optimise revenue under the New Electricity Trading Arrangements (NETA) and help in the connection of the renewable energy to the electric grid system. The four integrated work programmes of the project are described and involve a system study examining market penetration of renewable generators, a technical study into connection of renewable generators and energy storage, a small scale demonstration, and a pilot scale energy storage plant at Little Barton in Cambridgeshire. Problems leading to the closure of the project are discussed

  9. Regenesys utility scale energy storage. Project summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the work to date, the current situation and the future direction of a project carried out by Regenesys Technology Ltd. (RGN) to investigate the benefits of electrochemical energy storage for power generators using renewable energy sources focussing on wind energy. The background to the study is traced covering the progress of the Regenesys energy storage technology, and the milestones achieved and lessons learnt. Details are given of the planned renewable-store-market interface to allow renewable generators optimise revenue under the New Electricity Trading Arrangements (NETA) and help in the connection of the renewable energy to the electric grid system. The four integrated work programmes of the project are described and involve a system study examining market penetration of renewable generators, a technical study into connection of renewable generators and energy storage, a small scale demonstration, and a pilot scale energy storage plant at Little Barton in Cambridgeshire. Problems leading to the closure of the project are discussed.

  10. Teacher Improvement Projects in Guinea: Lessons Learned from Taking a Program to National Scale.

    Science.gov (United States)

    Schwille, John; Dembele, Martial; Diallo, Alpha Mahmoudou

    2001-01-01

    Highlights lessons learned from a small, grant-funded teacher improvement project in Guinea that went nationwide, including: it is possible to make such a system work on a national scale in a resource-scarce country; effective initial and continued training is critical for all participants; it is difficult to provide close-to-school assistance…

  11. Lesson Study and History Education

    Science.gov (United States)

    Halvorsen, Anne-Lise; Kesler Lund, Alisa

    2013-01-01

    This article examines the experiences of a group of fifth-grade teachers who used lesson study, a teacher-driven form of professional development, to teach history in a project supported by a Teaching American History Grant. The project addressed the following questions: What does a lesson study cycle for history education look like? What…

  12. STATUS OF MECHANICAL SLUDGE REMOVAL AND COOLING COILS CLOSURE AT THE SAVANNAH RIVER SITE - F TANK FARM CLOSURE PORJECT -9225

    International Nuclear Information System (INIS)

    Jolly, R.

    2009-01-01

    The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal using the Waste on Wheels (WOW) system within two of its storage tanks. The Waste on Wheels (WOW) system is designed to be relatively mobile with the ability for many components to be redeployed to multiple tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2839 cubic meters (750,000 gallons) each. In addition, Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. DOE intends to remove from service and operationally close Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. After obtaining regulatory approval, the tanks and cooling coils will be isolated and filled with grout for long term stabilization. Mechanical Sludge Removal of the remaining sludge waste within Tank 6 removed ∼ 75% of the original 25,000 gallons in August 2007. Utilizing lessons learned from Tank 6, Tank 5 Mechanical Sludge Removal completed removal of ∼ 90% of the original 125 cubic meters (33,000 gallons) of sludge material in May 2008. The successful removal of sludge material meets the requirement of approximately 19 to 28 cubic meters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. The Chemical Cleaning Process will utilize 8 wt% oxalic acid to dissolve the remaining sludge heel. The flow sheet for Chemical Cleaning planned a 20:1 volume ratio of acid to sludge for the first strike with mixing provided by the submersible mixer pumps. The subsequent strikes will utilize a 13:1 volume ratio of acid to sludge with no mixing. The results of the Chemical Cleaning Process are detailed in the 'Status of Chemical

  13. Defense Base Realignment and Closure Budget Data for the Closure of Marine Corps Air Station El Toro and Tustin, California, and the Realignment to Naval Air Station Miramar, California

    National Research Council Canada - National Science Library

    1994-01-01

    ... requested for each military construction project associated with base realignment and closure does not exceed the original estimated cost provided to the Commission on Defense Base Closure and Realignment (the Commission...

  14. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2003-01-01

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D and D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D and D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D and D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D and D activities. A reference section is included to provide additional information. This document does not address D and D lessons learned that are not pertinent to criticality safety

  15. "It Reminded Me of What Really Matters": Teacher Responses to the Lessons from Auschwitz Project

    Science.gov (United States)

    Maitles, Henry; Cowan, Paula

    2012-01-01

    Since 2007, the Lessons from Auschwitz Project organised by the Holocaust Education Trust, has taken groups of Scottish senior school students (between 16 and 18 years) and where possible an accompanying teacher from their school, to Auschwitz-Birkenau Memorial and Museum as part of a process of increasing young people's knowledge and…

  16. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  17. A comparison of two endoscopic closures: over-the-scope clip (OTSC) versus KING closure (endoloop plus clips) in a randomized long-term experimental study

    Czech Academy of Sciences Publication Activity Database

    Doležel, R.; Ryska, O.; Kollár, M.; Juhásová, Jana; Kalvach, J.; Ryska, M.; Martínek, J.

    2016-01-01

    Roč. 30, č. 11 (2016), s. 4910-4916 ISSN 0930-2794 R&D Projects: GA MZd(CZ) NT13634; GA MŠk ED2.1.00/03.0124 Institutional support: RVO:67985904 Keywords : NOTES * endoscopic closure * KING closure * over-the-scope clip Subject RIV: FJ - Surgery incl. Transplants Impact factor: 3.747, year: 2016

  18. United States Support Programme (USSP): Lessons Learned from the Management of Complex, Multi-Stakeholder Projects for International Safeguards

    International Nuclear Information System (INIS)

    Diaz, R.; Tackentien, J.

    2015-01-01

    This paper will review USSP experiences, lessons learned, and proposed future strategies on the management of complex projects including the Universal Non-Destructive Assay Data Acquisition Platform (UNAP) instrument development task. The focus will be on identifying lessons learned to formulate strategies to minimize risk and maximize the potential of commercial success for future complex projects. Topics planned for inclusion are: 1. Initial agreement amongst all stakeholders on the justification of the need of the development including market studies of existing/near term future COTS technology capabilities; 2. Initial confirmation that there is a market for the product other than the IAEA to reduce investment risk; 3. Agreement on an accelerated initial project schedule from request acceptance to commercial unit production including per unit cost and quantities; 4. During product development, obtaining periodic customer reaffirmation of the need and quantities for the product per the existing schedule and per unit price. (author)

  19. 324 Building REC and HLV Tank Closure Plan

    International Nuclear Information System (INIS)

    Becker-Khaleel, B.; Schlick, K.

    1995-12-01

    This closure plan describes the activities necessary to close the 324 Radiochemical Engineering Cells (REC) and High-Level Vault (HLV) in accordance with the Washington State Dangerous Waste regulations. To provide a complete description of the activities required, the closure plan relies on information contained in the 324 Building B-Cell Safety Cleanout Project (BCCP) plans, the 324 Building REC HLV Interim Waste Management Plan (IWMP), the Project Management Plan for Nuclear Facilities Management 300 Area Compliance Program, and the 324 High Level Vault Interim Removal Action Project (project management plan [PMP]). The IWMP addresses the management of mixed waste in accordance with state and federal hazardous waste regulations. It provides a strategy for managing high-activity mixed waste in compliance with Resource Conservation and Recovery Act (RCRA) requirements or provides for an alternative management approach for the waste. The BCCP outlines the past, present, and future activities necessary for removing from B-Cell the solid waste, including mixed waste generated as a result of historical research and development (R ampersand D) activities conducted in the cell. The BCCP also includes all records and project files associated with the B-Cell cleanout. This information is referenced throughout the closure plan. The PMP sets forth the plans, organization, and systems that Pacific Northwest National Laboratory (PNNL) will use to direct and control the 324 High-Level Vault Interim Removal Action Project. This project will develop and implement a treatment strategy that will remove and stabilize the inventory of liquid waste from the 324 HLV tanks. The PMP also provides for flushing and sampling the flush solution

  20. Identifying different methods for creating knowledge from lessons learned in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad Norang

    2016-01-01

    Full Text Available Nowadays, the increase in competition has increased the relative importance of innovation for most firms and many managers believe a good innovation must be knowledge oriented. This paper has tried to determine different methods for creating knowledge in project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 32 experts who were well informed about different methods of knowledge creation and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The study has detected 11 methods for knowledge creation and lessons learned. In terms of preliminary assessment, business transactions has received the highest impact while knowledge team has received the highest effect in terms of necessary assessment. The results of this survey have indicated that although there are several methods for detecting knowledge within organizations, in most cases, it is not easy to gain value added knowledge within an organization, quickly. The people who participated in our survey have indicated that organizational commitment, brainstorming, Delphi and storytelling also have played important role for creation of knowledge. The results have also shown that brainstorming, knowledge brokers, map knowledge and work experience were easier to use for knowledge creation and lessons learned compared with other forms of knowledge creation.

  1. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    Energy Technology Data Exchange (ETDEWEB)

    Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River

  2. Environmental assessment of nuclear projects in Canada - process, participation, lessons learned

    International Nuclear Information System (INIS)

    Underdown, G.A.; Brown, P.A.; Morrison, R.W.

    1995-01-01

    This paper documents public participation in decision-making for five cases of nuclear-based projects in Canada. Two cases involve the application of the Federal Environmental Assessment and Review Process (EARP), a formal, non-judicial process for public involvement in projects with a potential environmental impact. It is being applied to the development of new Uranium mines and the disposal of used nuclear fuels. The siting of radioactive waste facilities, generally unwanted by the communities, presents many difficult challenges which needs to be addressed before a project goes through the EARP process. An open, consultative, community-based approach to decision-making about siting is being applied in the three cases: Port Hope, Scarborough and Surrey. A number of lessons have been learned, the most important that there is a need to establish an acceptable process that includes 'getting the science right' on a project before attempting to find a site. The EARP, in most cases, provides a good mechanism for the sharing of information about a potential between the proponents and the public as long as there are no major unresolved contentious issues such as the unwanted siting of a waste facility in a particular community. 19 refs

  3. Closure Report for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR) Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    Energy Technology Data Exchange (ETDEWEB)

    Sloop, Christina

    2017-12-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.

  4. Savannah River Site environmental restoration lessons learned program

    International Nuclear Information System (INIS)

    Plunkett, R.A.; Leibfarth, E.C.; Treger, T.M.; Blackmon, A.M.

    1993-01-01

    For the past three years environmental restoration has been formally consolidated at Savannah River Site. Accomplishments include waste site investigations to closure activities. Positive, as well as negatively impacting, events have occurred. Until recently, lessons learned were captured on a less than formal basis. Now, a program based upon critiques, evaluations and corrective actions is being used. This presentation reviews the development, implementation and use of that program

  5. Acceptable results of early closure of loop ileostomy to protect low rectal anastomosis

    DEFF Research Database (Denmark)

    Perdawid, Sharafaden Karim; Andersen, Ole Bjørn; Perdawood, Sharaf

    2011-01-01

    INTRODUCTION: This was a pilot project performed prior to full implementation of early loop ileostomy closure (within two weeks) following low anterior resection of the rectum in a group of patients selected according to previously recommended criteria for safe, early ileostomy closure. MATERIAL......, closure operation, the postoperative closure period and follow-up. RESULTS: Eleven patients were included (men, n = 4) with a median age of 58 years (range 47-79 years). Ileostomy closure was performed at a median of ten days (range 8-13 days) following rectum resection. The median hospital stay was 16...

  6. Code of Conduct for wind-power projects - Phases 1 and 2; Code of Conduct fuer windkraftprojekte. Phase 1 und 2 - Systemanalyse, Lessons Learned und Bewertung bestehender Instrumente

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-08-15

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  7. Single loop-and-clips technique (KING closure) for gastrotomy closure after transgastric ovariectomy: a survival experiment

    Czech Academy of Sciences Publication Activity Database

    Ryska, O.; Martinek, J.; Filípková, T.; Doležel, R.; Juhásová, Jana; Motlík, Jan; Zavoral, M.; Ryska, M.

    2012-01-01

    Roč. 7, č. 4 (2012), s. 233-239 ISSN 1895-4588 R&D Projects: GA MZd NS9994 Institutional research plan: CEZ:AV0Z50450515 Keywords : natural orifice transluminal endoscopic surgery * gastric closure * clips * endoloop Subject RIV: FJ - Surgery incl. Transplants Impact factor: 0.757, year: 2012

  8. Resettling refugees and safeguarding their mental health: lessons learned from the Canadian Refugee Resettlement Project.

    Science.gov (United States)

    Beiser, Morton

    2009-12-01

    The Ryerson University Refugee Resettlement Project (RRP), a decade-long study of 1348 Southeast Asian refugees who came to Canada between 1979 and 1981, is one of the largest, most comprehensive and longest-lived investigations of refugee resettlement ever carried out. Knowledge gleaned from the RRP about research methodology, about the resettlement experience, about the social costs of resettling refugees, about factors that promote or hinder integration, about risk and protective factors for refugee mental health, and about the refugees' consumption of mental health and social services is summarized in the form of 18 "Lessons." The lessons are offered in order to encourage and stimulate further research, as well to suggest policy and practice innovations that could help make resettlement easier, less costly, more effective, and more humane.

  9. Effects of Multiple Intelligences Supported Project-Based Learning on Students' Achievement Levels and Attitudes towards English Lesson

    Science.gov (United States)

    Bas, Gökhan; Beyhan, Ömer

    2010-01-01

    The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students' achievement and their attitude towards English lesson. The research was carried out in 2009-2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary…

  10. Laparoscopic common bile duct exploration. Lessons learned after 200 cases.

    Science.gov (United States)

    Abellán Morcillo, Israel; Qurashi, Kamran; Abrisqueta Carrión, Jesús; Martinez Isla, Alberto

    2014-05-01

    Laparoscopic common bile duct exploration (LCBDE) is a reliable, reproducible and cost-effective treatment for common bile duct stones. Several techniques have been described for choledochotomy closure. To present our experience and the lessons learned in more than 200 cases of LCBDE. Between January 1999 and July 2012, 206 patients with common bile duct stones underwent LCBDE. At the beginning of the series, we performed the closure of the CBD over a T-tube (36 patients), subsequently we favoured closure over an antegrade stent (133 patients) but due to a high incidence of acute pancreatitis in the last 16 patients we have performed primary closure. The 3 closure groups were matched for age and sex. Jaundice was the most frequent presentation. A total of 185 (88,5%) patients underwent choledochotomy whereas in 17 (8,7%) patients the transcystic route was used. The group that underwent choledochotomy had a larger size of stones compared to the transcystic group (9,7 vs 7,6mm). In the stented group we found an 11,6% incidence of pancreatitis and 26,1% of hyperamylasemia. In the primary closure group we found a clear improvement of complications and hospital stay. The increased experience of the surgeon and age (younger than 75) had a positive impact on mortality and morbidity. Primary closure of the common bile duct after LCBDE seems to be superior to closure over a T tube and stents. The learning curve seems to have a positive impact on the outcomes making it a safe and reproducible technique especially for patients aged under 75. Copyright © 2013 AEC. Published by Elsevier Espana. All rights reserved.

  11. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    Energy Technology Data Exchange (ETDEWEB)

    Holst, Kent (Iowa Stored Energy Plant Agency, Traer, IA); Huff, Georgianne; Schulte, Robert H. (Schulte Associates LLC, Northfield, MN); Critelli, Nicholas (Critelli Law Office PC, Des Moines, IA)

    2012-01-01

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

  12. The SeaView EarthCube project: Lessons Learned from Integrating Across Repositories

    Science.gov (United States)

    Diggs, S. C.; Stocks, K. I.; Arko, R. A.; Kinkade, D.; Shepherd, A.; Olson, C. J.; Pham, A.

    2017-12-01

    SeaView is an NSF-funded EarthCube Integrative Activity Project working with 5 existing data repositories* to provide oceanographers with highly integrated thematic data collections in user-requested formats. The project has three complementary goals: Supporting Scientists: SeaView targets scientists' need for easy access to data of interest that are ready to import into their preferred tool. Strengthening Repositories: By integrating data from multiple repositories for science use, SeaView is helping the ocean data repositories align their data and processes and make ocean data more accessible and easily integrated. Informing EarthCube (earthcube.org): SeaView's experience as an integration demonstration can inform the larger NSF EarthCube architecture and design effort. The challenges faced in this small-scale effort are informative to geosciences cyberinfrastructure more generally. Here we focus on the lessons learned that may inform other data facilities and integrative architecture projects. (The SeaView data collections will be presented at the Ocean Sciences 2018 meeting.) One example is the importance of shared semantics, with persistent identifiers, for key integration elements across the data sets (e.g. cruise, parameter, and project/program.) These must allow for revision through time and should have an agreed authority or process for resolving conflicts: aligning identifiers and correcting errors were time consuming and often required both deep domain knowledge and "back end" knowledge of the data facilities. Another example is the need for robust provenance, and tools that support automated or semi-automated data transform pipelines that capture provenance. Multiple copies and versions of data are now flowing into repositories, and onward to long-term archives such as NOAA NCEI and umbrella portals such as DataONE. Exact copies can be identified with hashes (for those that have the skills), but it can be painfully difficult to understand the processing

  13. Amish-Initiated Burn Care Project: Case Report and Lessons Learned in Participatory Research.

    Science.gov (United States)

    Hess, Rosanna F

    2017-03-01

    This case report describes the phases of an Amish Burn Care Project and the lessons learned throughout the process. Data sources to construct the case report included participant observation, interviews, archival documents, and a focus group. The narrative is organized into five phases of a participatory research approach: engagement, formalization, mobilization, maintenance, and expansion. Community-initiated research led to legitimate change, working together for change took time, team members grew in mutual trust and respect for each other, cultural humility brought personal and professional growth, and capacity building took place through mutually supported efforts.

  14. TANK FARM CLOSURE - A NEW TWIST ON REGULATORY STRATEGIES FOR CLOSURE OF WASTE TANK RESIDUALS FOLLOWING NUREG

    International Nuclear Information System (INIS)

    LEHMAN LL

    2008-01-01

    Waste from a number of single-shell tanks (SST) at the U.S. Department of Energy's (DOE) Hanford Site has been retrieved by CH2M HILL Hanford Group to fulfill the requirements of the 'Hanford Federal Facility Agreement and Consent Order (HFFACO) [1]. Laboratory analyses of the Hanford tank residual wastes have provided concentration data which will be used to determine waste classification and disposal options for tank residuals. The closure of tank farm facilities remains one of the most challenging activities faced by the DOE. This is due in part to the complicated regulatory structures that have developed. These regulatory structures are different at each of the DOE sites, making it difficult to apply lessons learned from one site to the next. During the past two years with the passage of the Section 3116 of the 'Ronald Reagan Defense Authorization Act of 2005' (NDAA) [2] some standardization has emerged for Savannah River Site and the Idaho National Laboratory tank residuals. Recently, with the issuance of 'NRC Staff Guidance for Activities Related to US. Department of Energy Waste Determinations' (NUREG-1854) [3] more explicit options may be considered for Hanford tank residuals than are presently available under DOE Orders. NUREG-1854, issued in August 2007, contains several key pieces of information that if utilized by the DOE in the tank closure process, could simplify waste classification and streamline the NRC review process by providing information to the NRC in their preferred format. Other provisions of this NUREG allow different methods to be applied in determining when waste retrieval is complete by incorporating actual project costs and health risks into the calculation of 'technically and economically practical'. Additionally, the NUREG requires a strong understanding of the uncertainties of the analyses, which given the desire of some NRC/DOE staff may increase the likelihood of using probabilistic approaches to uncertainty analysis. The purpose

  15. Tunneling on the Yucca Mountain Project: Progress and lessons learned

    International Nuclear Information System (INIS)

    Hansmire, W.H.; Rogers, D.J.; Wightman, W.D.

    1996-01-01

    The Yucca Mountain Site Characterization Project is the US's effort to confirm the technical acceptability of Yucca Mountain as a repository for high-level nuclear waste. A key part of the site characterization project is the construction of a 7.8-km-long, 7.6-m-diameter tunnel for in-depth geologic and other scientific investigations. The work is governed in varying degrees by the special requirements for nuclear quality assurance, which imposes uncommon and often stringent limitations on the materials which can be used in construction, the tunneling methods and procedures used, and record-keeping for many activities. This paper presents the current status of what has been learned, how construction has adapted to meet the requirements, and how the requirements were interpreted in a mitigating way to meet the legal obligations, yet build the tunnel as rapidly as possible. With regard to design methodologies and the realities of tunnel construction, ground support with a shielded Tunnel Boring Machine is discussed. Notable lessons learned include the need for broad design analyses for a wide variety of conditions and how construction procedures affect ground support

  16. Sustainable closure of construction materials quarries in Cuba

    Directory of Open Access Journals (Sweden)

    Julio Montero-Matos

    2017-10-01

    Full Text Available The inclusion of effective mine closure plans in the exploitation project is the way to compensate for the harmful effect of this activity. Based on a diagnosis carried out in 11 sites in operation, belonging to the company Canteras, a methodology was designed with a systemic and integral approach that consists of five stages and allows the execution of quarry closures in a sustainable manner. The Delphi method was applied to select the criteria that directly affect the sustainable closure of quarries in such a way that it considers the essential postulates of the Cuban Economic Model (MEC. The proposed methodology represents a contribution to the planning and design of the mining closure in Cuban non-metallic deposits to guarantee the reduction of the environmental impacts caused during its operation and the reduction, to the lesser extent possible, of negative socio-economic effects for the workers and the community located in the area of influence of the quarries. Currently applied in the quarry of San José, in Mayabeque province.

  17. Planning for closures of hazardous waste land disposal units at the Oak Ridge Y-12 plant

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; DeLozier, M.F.P.; Manrod, W.E.

    1988-01-01

    Eight hazardous waste land disposal units at the Oak Ridge Y-12 Plant are being closed in accordance with the Resource Conservation and Recovery Act (RCRA) under an integrated multi-year program. The units, some of which date back to the early 1950s and include five surface impoundments, two landfills and a land treatment unit, have been used for the management of a variety of types of hazardous wastes. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. The units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. Closure of all eight units must be initiated by November 8, 1988. Funding for the eight closures is being provided by a new Department of Energy budget category, the environmental Restoration Budget Category (ERBC), which is intended to allow for a more rapid response to environmental problems and regulatory requirements. A major project, Closure and Post-Closure Activities (CAPCA) has been identified for ERBC funding to close the land disposal units in accordance with RCRA requirements. Establishing the project scope has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA project include risk assessments and the preparation of an integrated project schedule

  18. St. Louis FUSRAP Lessons Learned

    International Nuclear Information System (INIS)

    Eberlin, J.; Williams, D.; Mueller, D.

    2003-01-01

    The purpose of this paper is to present lessons learned from fours years' experience conducting Remedial Investigation and Remedial Action activities at the St. Louis Downtown Site (SLDS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Many FUSRAP sites are experiencing challenges conducting Remedial Actions within forecasted volume and budget estimates. The St. Louis FUSRAP lessons learned provide insight to options for cost effective remediation at FUSRAP sites. The lessons learned are focused on project planning (budget and schedule), investigation, design, and construction

  19. Professor's Page: Do Demonstration Lessons Work?

    Science.gov (United States)

    Clarke, Doug

    2011-01-01

    As part of a large research and professional development project funded by the Catholic Education Office Melbourne (CEOM), called "Contemporary Teaching and Learning of Mathematics," the ACU team has been leading demonstration lessons. There is certainly not universal agreement on the worth of demonstration lessons in the mathematics…

  20. Integrating gender into natural resources management projects: USAID lessons learned.

    Science.gov (United States)

    1998-01-01

    This article discusses USAID's lessons learned about integrating gender into natural resource management (NRM) projects in Peru, the Philippines, and Kenya. In Peru, USAID integrated women into a solid waste management project by lending money to invest in trash collection supplies. The loans allowed women to collect household waste, transfer it to a landfill, and provide additional sanitary disposal. The women were paid through direct fees from households and through service contracts with municipalities. In Mindanao, the Philippines, women were taught about the health impact of clean water and how to monitor water quality, including the monitoring of E. coli bacteria. Both men and women were taught soil conservation techniques for reducing the amount of silt running into the lake, which interferes with the generation of electricity and affects the health of everyone. The education helped women realize the importance of reducing silt and capitalized on their interest in protecting the health of their families. The women were thus willing to monitor the lake's water quality to determine if the conservation efforts were effective. In Kenya, USAID evaluated its Ecology, Community Organization, and Gender project in the Rift Valley, which helped resettle a landless community and helped with sustainable NRM. The evaluation revealed that women's relative bargaining power was less than men's. Organized capacity building that strengthened women's networks and improved their capacity to push issues onto the community agenda assured women a voice in setting the local NRM agenda.

  1. Recruitment and Lessons Learned from a Community-Based Intervention Program: The Learning Families Project in Hong Kong.

    Science.gov (United States)

    Chu, Joanna T W; Wan, Alice; Stewart, Sunita M; Ng, Kwok Tung; Lam, Tai Hing; Chan, Sophia S

    2018-01-01

    Recruitment is central to any research project, and recruitment itself should be well documented and researched. We describe our recruitment efforts for a community-based research project-entitled the Learning Families Project-conducted in Hong Kong. In collaboration with community stakeholders, residents from a public housing estate were recruited to participate in family programs aimed at enhancing family well-being. Various recruitment strategies were employed including the distribution of 19,200 leaflets, 688 posters, a banner, a kick-off ceremony, 10 promotion activities, 1,000 direct calls, word of mouth, 51 mobile counters, and 10 door-to-door visits. Drawing on field notes, research logs, short questionnaires, and focus group conducted with our community partners and residents, we describe and discuss our recruitment strategies, challenges, and lessons learned. Over a 9-month period, 980 participants were recruited and participated in our study, exceeding our recruitment goal (860 participants). Several observations were made including active recruitment strategies (i.e., door-to-door and mobile counter) being more effective than passive strategies (i.e., posters and leaflets); the importance of raising project awareness to facilitate recruitment; and the challenges encountered (i.e., burn-out and loss of motivation of staff, decreased community capacity in collaborating in research projects). The lessons learned include the importance of engaging Chinese communities, utilizing a positive outreach approach, and setting realistic expectations. Although similar recruitment strategies have been reported the West, a number of cultural differences should be taken into account when working with Chinese population. Further research is needed to examine the effectiveness of tailoring recruitment strategies to various populations.

  2. Lessons Learned by Community Stakeholders in the Massachusetts Childhood Obesity Research Demonstration (MA-CORD) Project, 2013–2014

    Science.gov (United States)

    Ganter, Claudia; Aftosmes-Tobio, Alyssa; Chuang, Emmeline; Kwass, Jo-Ann; Land, Thomas

    2017-01-01

    Introduction Childhood obesity is a multifaceted disease that requires sustainable, multidimensional approaches that support change at the individual, community, and systems levels. The Massachusetts Childhood Obesity Research Demonstration project addressed this need by using clinical and public health evidence-based methods to prevent childhood obesity. To date, little information is known about successes and lessons learned from implementing such large-scale interventions. To address this gap, we examined perspectives of community stakeholders from various sectors on successes achieved and lessons learned during the implementation process. Methods We conducted 39 semistructured interviews with key stakeholders from 6 community sectors in 2 low-income communities from November 2013 through April 2014, during project implementation. Interviews were audio-recorded, transcribed, and analyzed by using the constant comparative method. Data were analyzed by using QSR NVivo 10. Results Successes included increased parental involvement in children’s health and education, increased connections within participating organizations and within the broader community, changes in organizational policies and environments to better support healthy living, and improvements in health behaviors in children, parents, and stakeholders. Lessons learned included the importance of obtaining administrative and leadership support, involving key stakeholders early in the program planning process, creating buffers that allow for unexpected changes, and establishing opportunities for regular communication within and across sectors. Conclusion Study findings indicate that multidisciplinary approaches support health behavior change and provide insight into key issues to consider in developing and implementing such approaches in low-income communities. PMID:28125400

  3. 'It ain't what you do it's the way that you do it': lessons for health care from decommissioning of older people's services.

    Science.gov (United States)

    Robinson, Suzanne; Glasby, Jon; Allen, Kerry

    2013-11-01

    Public sector organisations are facing one of the most difficult financial periods in history and local decision-makers are tasked with making tough rationing decisions. Withdrawing or limiting services is an emotive and complex task and something the National Health Service has always found difficult. Over time, local authorities have gained significant experience in the closure of care homes - an equally complex and controversial issue. Drawing on local knowledge and best practice examples, this article highlights lessons and themes identified by those decommissioning care home services. We believe that such lessons are relevant to those making disinvestment decisions across public sector services, including health-care. The study employed semi-structured interviews with 12 Directors of Adult Social Services who had been highlighted nationally as having extensive experience of home closures. Interviews were conducted over a 2-week period in March 2011. Results from the study found that having local policy guidance that is perceived as fair and reasonable was advocated by those involved in home closures. Many local policies had evolved over time and had often been developed following experiences of home closures (both good and bad). Decisions to close care home services require a combination of strong leadership, clear strategic goals, a fair decision-making process, strong evidence of the need for change and good communication, alongside wider stakeholder engagement and support. The current financial challenge means that public sector organisations need to make tough choices on investment and disinvestment decisions. Any such decisions need to be influenced by what we know constitutes best practice. Sharing lessons and experiences within and between sectors could well inform and develop decision-making practices. © 2013 John Wiley & Sons Ltd.

  4. RCRA closure of eight land-based units at the Y-12 plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Welch, S.H.

    1988-01-01

    Eight land-based hazardous waste management units at the Oak Ridge Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of risk assessments and the preparation of an integrated schedule

  5. Lessons learned from the NREL village power program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.W. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NREL`s recent experiences and lessons learned.

  6. Lessons Learned from the NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.

    1998-07-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NRELs recent experiences and lessons learned.

  7. Writing Assignments in Disguise: Lessons Learned Using Video Projects in the Classroom

    Science.gov (United States)

    Wade, P.; Courtney, A.

    2012-12-01

    This study describes the instructional approach of using student-created video documentaries as projects in an undergraduate non-science majors' Energy Perspectives science course. Four years of teaching this course provided many reflective teaching moments from which we have enhanced our instructional approach to teaching students how to construct a quality Ken Burn's style science video. Fundamental to a good video documentary is the story told via a narrative which involves significant writing, editing and rewriting. Many students primarily associate a video documentary with visual imagery and do not realize the importance of writing in the production of the video. Required components of the student-created video include: 1) select a topic, 2) conduct research, 3) write an outline, 4) write a narrative, 5) construct a project storyboard, 6) shoot or acquire video and photos (from legal sources), 7) record the narrative, 8) construct the video documentary, 9) edit and 10) finalize the project. Two knowledge survey instruments (administered pre- and post) were used for assessment purposes. One survey focused on the skills necessary to research and produce video documentaries and the second survey assessed students' content knowledge acquired from each documentary. This talk will focus on the components necessary for video documentaries and the instructional lessons learned over the years. Additionally, results from both surveys and student reflections of the video project will be shared.

  8. Road Closures

    Data.gov (United States)

    Montgomery County of Maryland — This is an up to date map of current road closures in Montgomery County.This dataset is updated every few minutes from the Department of Transportation road closure...

  9. Project-Based Learning Using Discussion and Lesson-Learned Methods via Social Media Model for Enhancing Problem Solving Skills

    Science.gov (United States)

    Jewpanich, Chaiwat; Piriyasurawong, Pallop

    2015-01-01

    This research aims to 1) develop the project-based learning using discussion and lesson-learned methods via social media model (PBL-DLL SoMe Model) used for enhancing problem solving skills of undergraduate in education student, and 2) evaluate the PBL-DLL SoMe Model used for enhancing problem solving skills of undergraduate in education student.…

  10. The formation of a complex community program for diabetes control: lessons learned from a case study of Project DIRECT.

    Science.gov (United States)

    Goodman, R M; Liburd, L C; Green-Phillips, A

    2001-05-01

    A case study was conducted of the formation of a diabetes initiative in a largely African American urban community. The study focused on how confluent the original project model was with actual formation, what benefits were produced, what areas of needed improvement surfaced, and how different stakeholder groups characterized one another's involvement. The project produced several benefits but also experienced needed improvements in its formation, which suffered from a lack of communication, cooperation, and coordination; unclear goals and personnel roles; and early delays. Lessons include treating project formation as an important developmental stage and reducing bureaucratic management approaches not suited for community partnerships.

  11. Interferometric Imaging Directly with Closure Phases and Closure Amplitudes

    Science.gov (United States)

    Chael, Andrew A.; Johnson, Michael D.; Bouman, Katherine L.; Blackburn, Lindy L.; Akiyama, Kazunori; Narayan, Ramesh

    2018-04-01

    Interferometric imaging now achieves angular resolutions as fine as ∼10 μas, probing scales that are inaccessible to single telescopes. Traditional synthesis imaging methods require calibrated visibilities; however, interferometric calibration is challenging, especially at high frequencies. Nevertheless, most studies present only a single image of their data after a process of “self-calibration,” an iterative procedure where the initial image and calibration assumptions can significantly influence the final image. We present a method for efficient interferometric imaging directly using only closure amplitudes and closure phases, which are immune to station-based calibration errors. Closure-only imaging provides results that are as noncommittal as possible and allows for reconstructing an image independently from separate amplitude and phase self-calibration. While closure-only imaging eliminates some image information (e.g., the total image flux density and the image centroid), this information can be recovered through a small number of additional constraints. We demonstrate that closure-only imaging can produce high-fidelity results, even for sparse arrays such as the Event Horizon Telescope, and that the resulting images are independent of the level of systematic amplitude error. We apply closure imaging to VLBA and ALMA data and show that it is capable of matching or exceeding the performance of traditional self-calibration and CLEAN for these data sets.

  12. Improving IT Project Portfolio Management: Lessons Learned

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2013-01-01

    The IT PPM improvement process is not well understood, and our knowledge about what makes IT PPM improvement succeed or fail is not well developed. This article presents lessons learned from organizations trying to improve their IT PPM practice. Based on this research IT PPM practitioners are adv...

  13. The individual teacher in lesson study collaboration

    DEFF Research Database (Denmark)

    Skott, Charlotte Krog; Møller, Hanne

    2017-01-01

    used in lesson study research. Design/methodology/approach The authors use collective case studies. By being participant observers the authors provide detailed descriptions of two selected teachers’ lived experiences of lesson study collaboration. In addition to gain first-hand insights, the authors...... in the participation of each of the two teachers during a two-year lesson study project. By comparing these shifts the authors identify significant conditions for their individual learning. Research limitations/implications Although the study is small scale, both the insights into the different ways in which teachers...... participated and the theoretical insights might be valuable for other lesson study research approaches. Practical implications This paper provides valuable insights into conditions that might influence teachers’ participation in lesson study activities, especially in cultures with little experience of lesson...

  14. Examining approaches to renewables consultation. Lessons from Awel Aman Tawe community wind farm project

    Energy Technology Data Exchange (ETDEWEB)

    Hinshelwood, E; McCallum, D

    2001-07-01

    The overall aim was to develop and test a range of methods for a Participatory Assessment Process (PAP) in a large community on the subject of a Renewable Energy project in the area. Furthermore, to extract lessons regarding the methods and approaches undertaken. The specific objectives were: 1. To identify and shape appropriate tools, methods and approaches for undertaking a fair community assessment process regarding a Renewable Energy project in the locality. 2. To conduct an in-depth (ten month) community consultation and assessment process for a proposed wind farm. 3. To assess the methods and approaches used in the community consultation and assessment process for their efficiency and value to other developers and community groups. 4. To write up and disseminate the findings regarding the most valuable, efficient and appropriate methods and approaches undertaken. (Author)

  15. Joint Regulation of Radionuclides at Connecticut Yankee Haddam Neck Plant - Finding Common Ground and Lessons Learned

    International Nuclear Information System (INIS)

    Peters, J.; Glucksberg, N.; Fogg, A.; Couture, B.

    2006-01-01

    During the site closure of nuclear facilities where both radionuclides and chemicals are present in environmental media, state and federal regulatory agencies other than the Nuclear Regulatory Commission often have a stake in the regulation of the site closure process. At the Connecticut Yankee Atomic Power Company (CYAPCO) Haddam Neck Plant in Haddam, Connecticut, the site closure process includes both radiological and chemical cleanup which is regulated by two separate divisions within the state and two federal agencies. Each of the regulatory agencies has unique closure criteria which pertain to radionuclides and, consequently, there is overlapping and in some cases disparate regulation of radionuclides. Considerable effort has been expended by CYAPCO to find common ground in meeting the site closure requirements for radionuclides required by each of the agencies. This paper discusses the approaches that have been used by CYAPCO to address radionuclide site closure requirements. Significant lessons learned from these approaches include the demonstration that public health cleanup criteria for most radionuclides of concern at nuclear power generation facilities are protective for chemical toxicity concerns and are protective for ecological receptors and, consequently, performing a baseline ecological risk assessment for radionuclides at power generation facilities is not generally necessary. (authors)

  16. Repository Closure and Sealing Approach

    International Nuclear Information System (INIS)

    A.T. Watkins

    2000-01-01

    The scope of this analysis will be to develop the conceptual design of the closure seals and their locations in the Subsurface Facilities. The design will be based on the recently established program requirements for transitioning to the Site Recommendation (SR) design as outlined by ''Approach to Implementing the Site Recommendation Baseline'' (Stroupe 2000) and the ''Monitored Geologic Repository Project Description Document'' (CRWMS M andO 1999b). The objective of this analysis will be to assist in providing a description for the Subsurface Facilities System Description Document, Section 2 and finally to document any conclusions reached in order to contribute and provide support to the SR. This analysis is at a conceptual level and is considered adequate to support the SR design. The final closure barriers and seals for the ventilation shafts, and the north and south ramps will require these openings to be permanently sealed to limit excessive air and water inflows and prevent human intrusion. The major tasks identified with closure in this analysis are: (1) Developing the overall subsurface seal layout and identifying design and operational interfaces for the Subsurface Facilities. (2) Summarizing the general site conditions and general rock characteristic with respect to seal location and describing the seal selected. (3) Identify seal construction materials, methodology of construction and strategic locations including design of the seal and plugs. (4) Discussing methods to prevent human intrusion

  17. Vendor Assessment for the Waste Package Closure System (Yucca Mountain Project)

    International Nuclear Information System (INIS)

    Shelton-Davis, C.V.

    2003-01-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) has been tasked with developing, designing, constructing, and operating a full-scale prototype of the work package closure system. As a precursor to developing the conceptual design, all commercially available equipment was assessed to identify any existing technology gaps. This report presents the results of that assessment for all major equipment

  18. Vendor Assessment for the Waste Package Closure System (Yucca Mtn. Project)

    Energy Technology Data Exchange (ETDEWEB)

    Colleen Shelton-Davis

    2003-09-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) has been tasked with developing, designing, constructing, and operating a full-scale prototype of the work package closure system. As a precursor to developing the conceptual design, all commercially available equipment was assessed to identify any existing technology gaps. This report presents the results of that assessment for all major equipment.

  19. Vendor Assessment for the Waste Package Closure System (Yucca Mountain Project)

    Energy Technology Data Exchange (ETDEWEB)

    Shelton-Davis, C.V.

    2003-09-26

    The Idaho National Engineering and Environmental Laboratory (INEEL) has been tasked with developing, designing, constructing, and operating a full-scale prototype of the work package closure system. As a precursor to developing the conceptual design, all commercially available equipment was assessed to identify any existing technology gaps. This report presents the results of that assessment for all major equipment.

  20. The Value of Identifying and Recovering Lost GN&C Lessons Learned: Aeronautical, Spacecraft, and Launch Vehicle Examples

    Science.gov (United States)

    Dennehy, Cornelius J.; Labbe, Steve; Lebsock, Kenneth L.

    2010-01-01

    Within the broad aerospace community the importance of identifying, documenting and widely sharing lessons learned during system development, flight test, operational or research programs/projects is broadly acknowledged. Documenting and sharing lessons learned helps managers and engineers to minimize project risk and improve performance of their systems. Often significant lessons learned on a project fail to get captured even though they are well known 'tribal knowledge' amongst the project team members. The physical act of actually writing down and documenting these lessons learned for the next generation of NASA GN&C engineers fails to happen on some projects for various reasons. In this paper we will first review the importance of capturing lessons learned and then will discuss reasons why some lessons are not documented. A simple proven approach called 'Pause and Learn' will be highlighted as a proven low-impact method of organizational learning that could foster the timely capture of critical lessons learned. Lastly some examples of 'lost' GN&C lessons learned from the aeronautics, spacecraft and launch vehicle domains are briefly highlighted. In the context of this paper 'lost' refers to lessons that have not achieved broad visibility within the NASA-wide GN&C CoP because they are either undocumented, masked or poorly documented in the NASA Lessons Learned Information System (LLIS).

  1. Closure The Definitive Guide

    CERN Document Server

    Bolin, Michael

    2010-01-01

    If you're ready to use Closure to build rich web applications with JavaScript, this hands-on guide has precisely what you need to learn this suite of tools in depth. Closure makes it easy for experienced JavaScript developers to write and maintain large and complex codebases -- as Google has demonstrated by using Closure with Gmail, Google Docs, and Google Maps. Author and Closure contributor Michael Bolin has included numerous code examples and best practices, as well as valuable information not available publicly until now. You'll learn all about Closure's Library, Compiler, Templates, tes

  2. Progress and Lessons Learned in Transuranic Waste Disposition at The Department of Energy's Advanced Mixed Waste Treatment Project

    International Nuclear Information System (INIS)

    J.D. Mousseau; S.C. Raish; F.M. Russo

    2006-01-01

    This paper provides an overview of the Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) located at the Idaho National Laboratory (INL) and operated by Bechtel BWXT Idaho, LLC(BBWI) It describes the results to date in meeting the 6,000-cubic-meter Idaho Settlement Agreement milestone that was due December 31, 2005. The paper further describes lessons that have been learned from the project in the area of transuranic (TRU) waste processing and waste certification. Information contained within this paper would be beneficial to others who manage TRU waste for disposal at the Waste Isolation Pilot Plant (WIPP)

  3. Lessons learned on digital systems safety

    International Nuclear Information System (INIS)

    Sivertsen, Terje

    2005-06-01

    A decade ago, in 1994, lessons learned from Halden research activities on digital systems safety were summarized in the reports HWR-374 and HWR-375, under the title 'A Lessons Learned Report on Software Dependability'. The reports reviewed all activities made at the Halden Project in this field since 1977. As such, the reports provide a wealth of information on Halden research. At the same time, the lessons learned from the different activities are made more accessible to the reader by being summarized in terms of results, conclusions and recommendations. The present report provides a new lessons learned report, covering the Halden Project research activities in this area from 1994 to medio 2005. As before, the emphasis is on the results, conclusions and recommendations made from these activities, in particular how they can be utilized by different types of organisations, such as licensing authorities, safety assessors, power companies, and software developers. The contents of the report have been edited on the basis of input from a large number of Halden work reports, involving many different authors. Brief summaries of these reports are included in the last part of the report. (Author)

  4. Impact of Different Standard Type A7A Drum Closure-Ring Practices on Gasket Contraction and Bolt Closure Distance– 15621

    Energy Technology Data Exchange (ETDEWEB)

    Ketusky, Edward [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Blanton, Paul [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bobbitt, John H. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-03-11

    The Department of Energy, the Savannah River National Laboratory, several manufacturers of specification drums, and the United States Department of Transportation (DOT) are collaborating in the development of a guidance document for DOE contractors and vendors who wish to qualify containers to DOT 7A Type A requirements. Currently, the effort is focused on DOT 7A Type A 208-liter (55-gallons) drums with a standard 12-gauge bolted closure ring. The U.S. requirements, contained in Title 49, Part 178.350 “Specification 7A; general packaging, Type A specifies a competent authority review of the packaging is not required for the transport of (Class 7) radioactive material containing less than Type A quantities of radioactive material. For Type AF drums, a 4 ft. regulatory free drop must be performed, such that the drum “suffers maximum damage.” Although the actual orientation is not defined by the specification, recent studies suggest that maximum damage would result from a shallow angle top impact, where kinetic energy is transferred to the lid, ultimately causing heavy damage to the lid, or even worse, causing the lid to come off. Since each vendor develops closure recommendations/procedures for the drums they manufacture, key parameters applied to drums during closing vary based on vendor. As part of the initial phase of the collaboration, the impact of the closure variants on the ability of the drum to suffer maximum damage is investigated. Specifically, closure testing is performed varying: 1) the amount of torque applied to the closure ring bolt; and, 2) stress relief protocol, including: a) weight of hammer; and, b) orientation that the hammer hits the closure ring. After closure, the amount of drum lid gasket contraction and the distance that the closure bolt moves through the closure ring is measured.

  5. Estimating the costs of school closure for mitigating an influenza pandemic

    Directory of Open Access Journals (Sweden)

    Adams Elisabeth J

    2008-04-01

    Full Text Available Abstract Background School closure is a key component of many countries' plans to mitigate the effect of an influenza pandemic. Although a number of studies have suggested that such a policy might reduce the incidence, there are no published studies of the cost of such policies. This study attempts to fill this knowledge gap Methods School closure is expected to lead to significant work absenteeism of working parents who are likely to be the main care givers to their dependent children at home. The cost of absenteeism due to school closure is calculated as the paid productivity loss of parental absenteeism during the period of school closure. The cost is estimated from societal perspective using a nationally representative survey. Results The results show that overall about 16% of the workforce is likely to be the main caregiver for dependent children and therefore likely to take absenteeism. This rises to 30% in the health and social care sector, as a large proportion of the workforce are women. The estimated costs of school closure are significant, at £0.2 bn – £1.2 bn per week. School closure is likely to significantly exacerbate the pressures on the health system through staff absenteeism. Conclusion The estimates of school closure associated absenteeism and the projected cost would be useful for pandemic planning for business continuity, and for cost effectiveness evaluation of different pandemic influenza mitigation strategies.

  6. Drafting of the closure of the Asse salt mine. Final report

    International Nuclear Information System (INIS)

    Schneefuss, J.U.

    2001-01-01

    The report of the R and D-project 'Drafting of the closure of the Asse salt mine' contains the results of the first phases 'Basic findings' and 'Predrafting'. These phases were started after the backfilling of the south flank of the Asse salt mine was permitted in accordance to 2.2 of the operating program 'Future work at the Asse salt mine'. The knowledge status of May 2000 is reported. The result obtained in this program provides the basis for future drafting the closure of the Asse salt mine. The final results will include the long-term safety assessment to obtain the permission of the mining authorities for the closure of the Asse salt mine. The evaluation of the basic data has shown that further investigations are necessary. During the predrafting period the method for backfilling of the cavities, transport of the backfill and backfill and closure of the shafts were developed. Other parts of the concept for the closure are not finalized (control of the brine inflow when starting backfilling above the 658-m-level, minimizing of the possible effects of dissolution of carnallitite, avoiding of squeezing brines from deeper cavities through the disposal chambers etc.). (orig.) [de

  7. E-LEARNING FROM NATURE THROUGH E-LESSONS

    Directory of Open Access Journals (Sweden)

    Anca Cristina COLIBABA

    2017-08-01

    Full Text Available The article is a study based on the e-Learning from Nature project (2015-1-IT02-KA201-015133 funded by the European Commission. The project’s main objectives are centred on improving students’ low achievement and stimulating secondary school students’ interest in science subjects. The article focuses on scientific education and its challenges and suggests an innovative approach which connects science with nature. It examines one of the most important project outputs: the e-lessons (short video lessons created within the European partnership and the way they can contribute to increasing students’ motivation to learn science. Participant teachers’ testimonials have also been considered in the general evaluation of this project output.

  8. RCRA land unit closures at the Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; Delozier, M.F.P.; Manrod, W.E.

    1987-01-01

    Eight land-based hazardous waste management units at the Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA program include the development of risk assessments and the preparation of an integrated schedule

  9. Bruce A restart (execution and lessons-learned)

    International Nuclear Information System (INIS)

    Soini, J.

    2011-01-01

    Lessons learned with the Bruce Units 3 and 4 restart have been incorporated into the current refurbishment of Units 1 and 2. In addition, lessons learned on the lead unit (U2) are aggressively applied on the lagging unit (U1) to maximize efficiency and productivity. There will be a discussion on how this internal OPEX, along with external lessons learned, are used to continuously improve all aspects of the Bruce A Restart project management cycle, from scope selection, through planning and scheduling, to execution.

  10. Information collection regarding geoscientific monitoring techniques during closure of underground facility in crystalline rock

    International Nuclear Information System (INIS)

    Hosoya, Shinichi; Yamashita, Tadashi; Iwatsuki, Teruki; Saegusa, Hiromitsu; Onoe, Hironori; Ishibashi, Masayuki

    2016-01-01

    The Mizunami Underground Research Laboratory (MIU) project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami City in Gifu Prefecture, central Japan. On the occasion of the reform of the entire JAEA organization in 2014, JAEA identified the critical issues on the geoscientific research program: “Development of modelling technologies for mass transport”, “Development of drift backfilling technologies” and “Development of technologies for reducing groundwater inflow”, based on the latest results of the synthesizing R and D. The purposes of the “Development of drift backfilling technologies” are to develop closure methodology and technology, and long-term monitoring technology, and to evaluate resilience of geological environment. In order to achieve the purposes, previous information from the case example of underground facility constructed in crystalline rock in Europe has been collected in this study. In particular, the boundary conditions for the closure, geological characteristics, technical specifications, and method of monitoring have been focused. The information on the international project regarding drift closure test and development of monitoring technologies has also been collected. In addition, interviews were conducted to Finnish and Swedish specialists who have experiences involving planning, construction management, monitoring, and safety assessment for the closure to obtain the technical knowledge. Based on the collected information, concept and point of attention, which are regarding drift closure testing, and planning, execution management and monitoring on the closure of MIU, have been specified. (author)

  11. Professional Closure Beyond State Authorization

    Directory of Open Access Journals (Sweden)

    Gitte Sommer Harrits

    2014-03-01

    Full Text Available For decades, the Weberian approach to the study of professions has been strong, emphasizing state authorization and market monopolies as constituting what is considered a profession. Originally, however, the Weberian conception of closure, or the ways in which a profession is constituted and made separate, was broader. This article suggests a revision of the closure concept, integrating insights from Pierre Bourdieu, and conceptualizing professional closure as the intersection of social, symbolic and legal closure. Based on this revision, this article demonstrates how to apply such a concept in empirical studies. This is done by exploring social, symbolic and legal closure across sixteen professional degree programs. The analyses show a tendency for some overlap between different forms of closure, with a somewhat divergent pattern for legal closure. Results support the argument that we need to study these processes as an intersection of different sources of closure, including capital, lifestyles and discourse

  12. Merging symmetry projection methods with coupled cluster theory: Lessons from the Lipkin model Hamiltonian

    Energy Technology Data Exchange (ETDEWEB)

    Wahlen-Strothman, J. M. [Rice Univ., Houston, TX (United States); Henderson, T. H. [Rice Univ., Houston, TX (United States); Hermes, M. R. [Rice Univ., Houston, TX (United States); Degroote, M. [Rice Univ., Houston, TX (United States); Qiu, Y. [Rice Univ., Houston, TX (United States); Zhao, J. [Rice Univ., Houston, TX (United States); Dukelsky, J. [Consejo Superior de Investigaciones Cientificas (CSIC), Madrid (Spain). Inst. de Estructura de la Materia; Scuseria, G. E. [Rice Univ., Houston, TX (United States)

    2018-01-03

    Coupled cluster and symmetry projected Hartree-Fock are two central paradigms in electronic structure theory. However, they are very different. Single reference coupled cluster is highly successful for treating weakly correlated systems, but fails under strong correlation unless one sacrifices good quantum numbers and works with broken-symmetry wave functions, which is unphysical for finite systems. Symmetry projection is effective for the treatment of strong correlation at the mean-field level through multireference non-orthogonal configuration interaction wavefunctions, but unlike coupled cluster, it is neither size extensive nor ideal for treating dynamic correlation. We here examine different scenarios for merging these two dissimilar theories. We carry out this exercise over the integrable Lipkin model Hamiltonian, which despite its simplicity, encompasses non-trivial physics for degenerate systems and can be solved via diagonalization for a very large number of particles. We show how symmetry projection and coupled cluster doubles individually fail in different correlation limits, whereas models that merge these two theories are highly successful over the entire phase diagram. Despite the simplicity of the Lipkin Hamiltonian, the lessons learned in this work will be useful for building an ab initio symmetry projected coupled cluster theory that we expect to be accurate in the weakly and strongly correlated limits, as well as the recoupling regime.

  13. Tight closure and vanishing theorems

    International Nuclear Information System (INIS)

    Smith, K.E.

    2001-01-01

    Tight closure has become a thriving branch of commutative algebra since it was first introduced by Mel Hochster and Craig Huneke in 1986. Over the past few years, it has become increasingly clear that tight closure has deep connections with complex algebraic geometry as well, especially with those areas of algebraic geometry where vanishing theorems play a starring role. The purpose of these lectures is to introduce tight closure and to explain some of these connections with algebraic geometry. Tight closure is basically a technique for harnessing the power of the Frobenius map. The use of the Frobenius map to prove theorems about complex algebraic varieties is a familiar technique in algebraic geometry, so it should perhaps come as no surprise that tight closure is applicable to algebraic geometry. On the other hand, it seems that so far we are only seeing the tip of a large and very beautiful iceberg in terms of tight closure's interpretation and applications to algebraic geometry. Interestingly, although tight closure is a 'characteristic p' tool, many of the problems where tight closure has proved useful have also yielded to analytic (L2) techniques. Despite some striking parallels, there had been no specific result directly linking tight closure and L∼ techniques. Recently, however, the equivalence of an ideal central to the theory of tight closure was shown to be equivalent to a certain 'multiplier ideal' first defined using L2 methods. Presumably, deeper connections will continue to emerge. There are two main types of problems for which tight closure has been helpful: in identifying nice structure and in establishing uniform behavior. The original algebraic applications of tight closure include, for example, a quick proof of the Hochster-Roberts theorem on the Cohen-Macaulayness of rings of invariants, and also a refined version of the Brianqon-Skoda theorem on the uniform behaviour of integral closures of powers of ideals. More recent, geometric

  14. 40 CFR 264.228 - Closure and post-closure care.

    Science.gov (United States)

    2010-07-01

    ... remaining wastes to a bearing capacity sufficient to support final cover; and (iii) Cover the surface....112 must include both a plan for complying with paragraph (a)(1) of this section and a contingent plan... practicably removed at closure; and (ii) The owner or operator must prepare a contingent post-closure plan...

  15. RCRA corrective action and closure

    International Nuclear Information System (INIS)

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators' interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE's permitted facilities and interim status facilities

  16. Post-operative analgesic requirement in non-closure and closure of peritoneum during open appendectomy

    International Nuclear Information System (INIS)

    Khan, A.W.; Maqsood, R.; Saleem, M.M.

    2017-01-01

    To compare the mean post-operative analgesic requirement in non-closure and closure of peritoneum during open appendectomy. Study Design: Randomized controlled trial. Place and Duration of Study: Department of General Surgery Combined Military Hospital Quetta, from 1st August 2014 to 30th April 2015. Material and Methods: A total of 60 patients were included in this study and were divided into two groups of 30 each. Patients in group A underwent open appendectomy with closure of peritoneum while patients in group B had non-closure of peritoneum during the same procedure. Post-operatively, pain severity was assessed on visual analogue scale (VAS) numeric pain distress scale. On presence of VAS numeric pain distress scale between 5 to 7, intramuscular (IM) diclofenac sodium was given and on score >7, intravascular (IV) tramadol was given. The final outcome was measured at day 0 and day 1. Results: Pain score and analgesic requirements were significantly less in non-closure group than closure group on day 0 and day 1, showing statistically significant difference between the two groups. Conclusion: Mean post-operative analgesic requirement is significantly less in non-closure group as compared to closure group during open appendectomy. (author)

  17. Primary closure after carotid endarterectomy is not inferior to other closure techniques.

    Science.gov (United States)

    Avgerinos, Efthymios D; Chaer, Rabih A; Naddaf, Abdallah; El-Shazly, Omar M; Marone, Luke; Makaroun, Michel S

    2016-09-01

    Primary closure after carotid endarterectomy (CEA) has been much maligned as an inferior technique with worse outcomes than in patch closure. Our purpose was to compare perioperative and long-term results of different CEA closure techniques in a large institutional experience. A consecutive cohort of CEAs between January 1, 2000, and December 31, 2010, was retrospectively analyzed. Closure technique was used to divide patients into three groups: primary longitudinal arteriotomy closure (PRC), patch closure (PAC), and eversion closure (EVC). End points were perioperative events, long-term strokes, and restenosis ≥70%. Multivariate regression models were used to assess the effect of baseline predictors. There were 1737 CEA cases (bilateral, 143; mean age, 71.4 ± 9.3 years; 56.2% men; 35.3% symptomatic) performed during the study period with a mean clinical follow-up of 49.8 ± 36.4 months (range, 0-155 months). More men had primary closure, but other demographic and baseline symptoms were similar between groups. Half the patients had PAC, with the rest evenly distributed between PRC and EVC. The rate of nerve injury was 2.7%, the rate of reintervention for hematoma was 1.5%, and the length of hospital stay was 2.4 ± 3.0 days, with no significant differences among groups. The combined stroke and death rate was 2.5% overall and 3.9% and 1.7% in the symptomatic and asymptomatic cohort, respectively. Stroke and death rates were similar between groups: PRC, 11 (2.7%); PAC, 19 (2.2%); EVC, 13 (2.9%). Multivariate analysis showed baseline symptomatic disease (odds ratio, 2.4; P = .007) and heart failure (odds ratio, 3.1; P = .003) as predictors of perioperative stroke and death, but not the type of closure. Cox regression analysis demonstrated, among other risk factors, no statin use (hazard ratio, 2.1; P = .008) as a predictor of ipsilateral stroke and severe (glomerular filtration rate <30 mL/min/1.73 m(2)) renal insufficiency (hazard ratio, 2.6; P

  18. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    International Nuclear Information System (INIS)

    Mckirdy, Ian

    2011-01-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed. These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.

  19. IDENTIFICATION OF DOE'S POST-CLOSURE MONITORING NEEDS AND REQUIREMENTS

    Energy Technology Data Exchange (ETDEWEB)

    M.A. Ebadian, Ph.D.

    1999-01-01

    The 2006 plan sets an ambitious agenda for the U.S. Department of Energy (DOE), Office of Environmental Management (EM) and the remediation of sites contaminated by decades of nuclear weapons production activities. The plan's primary objective is to reduce overall clean up costs by first eliminating the environmental problems that are most expensive to control and safely maintain. In the context of the 2006 Plan, closure refers to the completion of area or facility specific cleanup projects. The cleanup levels are determined by the planned future use of the site or facility. Use restrictions are still undecided for most sites but are highly probable to exclude residential or agricultural activities. Most of the land will be remediated to ''industrial use'' levels with access restrictions and some areas will be closed-off through containment. Portions of the site will be reserved for waste disposal, either as a waste repository or the in-situ immobilization of contaminated soil and groundwater, and land use will be restricted to waste disposal only. The land used for waste disposal will require monitoring and maintenance activities after closure. Most of the land used for industrial use may also require such postclosure activities. The required postclosure monitoring and maintenance activities will be imposed by regulators and stakeholders. Regulators will not approve closure plans without clearly defined monitoring methods using approved technologies. Therefore, among all other more costly and labor-intensive closure-related activities, inadequate planning for monitoring and lack of appropriate monitoring technologies can prevent closure. The purpose of this project is to determine, document, and track the current and evolving postclosure monitoring requirements at DOE-EM sites. This information will aid CMST-CP in guiding its postclosure technology development and deployment efforts.

  20. Lessons Learned in Software Testing A Context-Driven Approach

    CERN Document Server

    Kaner, Cem; Pettichord, Bret

    2008-01-01

    Decades of software testing experience condensed into the most important lessons learned.The world's leading software testing experts lend you their wisdom and years of experience to help you avoid the most common mistakes in testing software. Each lesson is an assertion related to software testing, followed by an explanation or example that shows you the how, when, and why of the testing lesson. More than just tips, tricks, and pitfalls to avoid, Lessons Learned in Software Testing speeds you through the critical testing phase of the software development project without the extensive trial an

  1. Lessons Learned from Ares I Upper Stage Structures and Thermal Design

    Science.gov (United States)

    Ahmed, Rafiq

    2012-01-01

    The Ares 1 Upper Stage was part of the vehicle intended to succeed the Space Shuttle as the United States manned spaceflight vehicle. Although the Upper Stage project was cancelled, there were many lessons learned that are applicable to future vehicle design. Lessons learned that are briefly detailed in this Technical Memorandum are for specific technical areas such as tank design, common bulkhead design, thrust oscillation, control of flight and slosh loads, purge and hazardous gas system. In addition, lessons learned from a systems engineering and vehicle integration perspective are also included, such as computer aided design and engineering, scheduling, and data management. The need for detailed systems engineering in the early stages of a project is emphasized throughout this report. The intent is that future projects will be able to apply these lessons learned to keep costs down, schedules brief, and deliver products that perform to the expectations of their customers.

  2. Best practices for effective partnerships with Aboriginal groups : lessons learned from major Canadian projects in mining and forestry

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, C. [Labrador Inuit Association, NF (Canada)

    2004-07-01

    This PowerPoint presentation provided an update on effective partnerships and best practices reported in Canadian mining, forestry and energy projects. The forestry and mining industries have provided most of the models and best practices for natural resource projects. This presentation described the approach to negotiations for the Voisey's Bay Nickel Project and future steps for commercial success. The lessons learned were also discussed with particular reference to corporate agendas that help advance Aboriginal participation. The presentation outlined the expected results from Voisey's Bay Nickel Company Impact Benefit Agreement with the Labrador Inuit Association and the Innu Nation. The issue of responsible environmental management was also discussed along with long-term opportunities for jobs, education and business opportunities for Newfoundland and Labrador residents. figs.

  3. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs)

  4. Recruitment and Lessons Learned from a Community-Based Intervention Program: The Learning Families Project in Hong Kong

    Directory of Open Access Journals (Sweden)

    Joanna T. W. Chu

    2018-02-01

    Full Text Available BackgroundRecruitment is central to any research project, and recruitment itself should be well documented and researched. We describe our recruitment efforts for a community-based research project—entitled the Learning Families Project—conducted in Hong Kong.MethodsIn collaboration with community stakeholders, residents from a public housing estate were recruited to participate in family programs aimed at enhancing family well-being. Various recruitment strategies were employed including the distribution of 19,200 leaflets, 688 posters, a banner, a kick-off ceremony, 10 promotion activities, 1,000 direct calls, word of mouth, 51 mobile counters, and 10 door-to-door visits. Drawing on field notes, research logs, short questionnaires, and focus group conducted with our community partners and residents, we describe and discuss our recruitment strategies, challenges, and lessons learned.ResultsOver a 9-month period, 980 participants were recruited and participated in our study, exceeding our recruitment goal (860 participants. Several observations were made including active recruitment strategies (i.e., door-to-door and mobile counter being more effective than passive strategies (i.e., posters and leaflets; the importance of raising project awareness to facilitate recruitment; and the challenges encountered (i.e., burn-out and loss of motivation of staff, decreased community capacity in collaborating in research projects.ConclusionThe lessons learned include the importance of engaging Chinese communities, utilizing a positive outreach approach, and setting realistic expectations. Although similar recruitment strategies have been reported the West, a number of cultural differences should be taken into account when working with Chinese population. Further research is needed to examine the effectiveness of tailoring recruitment strategies to various populations.

  5. LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

    Energy Technology Data Exchange (ETDEWEB)

    Noonan, Christine F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Henry, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Corley, Courtney D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-01-14

    The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this document to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.

  6. Ring closure in actin polymers

    Energy Technology Data Exchange (ETDEWEB)

    Sinha, Supurna, E-mail: supurna@rri.res.in [Raman Research Institute, Bangalore 560080 (India); Chattopadhyay, Sebanti [Doon University, Dehradun 248001 (India)

    2017-03-18

    We present an analysis for the ring closure probability of semiflexible polymers within the pure bend Worm Like Chain (WLC) model. The ring closure probability predicted from our analysis can be tested against fluorescent actin cyclization experiments. We also discuss the effect of ring closure on bend angle fluctuations in actin polymers. - Highlights: • Ring closure of biopolymers. • Worm like chain model. • Predictions for experiments.

  7. Putting rural energy access projects into perspective: What lessons are relevant?

    International Nuclear Information System (INIS)

    Vleuten, Frank van der; Stam, Nienke; Plas, Robert-Jan van der

    2013-01-01

    As the Secretary General of the United Nations and the president of the World Bank are calling upon countries to commit themselves to universal access to modern energy services by 2030, and international players such as the International Energy Agency, the EU, and ESMAP are building scenarios how to accomplish this, this article demonstrates the non-linear dynamics of scaling up rural energy access, drawing among others from over 70 energy access projects implemented by the EASE network of national energy and development NGOs in eight countries and on experiences combining microfinance and (clean) energy access. The article shows that scaling up rural energy access demands careful tuning of support to the business models of rural entrepreneurs, in which development finance has only a limited role to play. The article argues for market development approaches that take a programmatic approach, change their intervention model as the market matures, and build on smart use of the limited sector capacity. The ultimate challenge is how to down-tune ambitions and spending power of the development community to match the absorption capacity of rural markets and the reality of entrepreneurs on the ground. - Highlights: • Practitioner's experiences and lessons, based on over 70 implemented projects. • Relevant for “Sustainable Energy for All” high-level initiative. • Match high international ambitions with low capacity of rural energy markets

  8. PUREX/UO3 Facilities deactivation lessons learned history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1996-09-19

    accompanied by and were an integral part of sweeping ``culture changes,`` the story of the lessons learned during the PUREX Deactivation Project are worth recounting. Foremost among the lessons is recognizing the benefits of ``right to left`` project planning. A deactivation project must start by identifying its end points, then make every task, budget, and organizational decision based on reaching those end points. Along with this key lesson is the knowledge that project planning and scheduling should be tied directly to costing, and the project status should be checked often (more often than needed to meet mandated reporting requirements) to reflect real-time work. People working on a successful project should never be guessing about its schedule or living with a paper schedule that does not represent the actual state of work. Other salient lessons were learned in the PUREX/UO3 Deactivation Project that support these guiding principles. They include recognizing the value of independent review, teamwork, and reengineering concepts; the need and value of cooperation between the DOE, its contractors, regulators, and stakeholders; and the essential nature of early and ongoing communication. Managing a successful project also requires being willing to take a fresh look at safety requirements and to apply them in a streamlined and sensible manner to deactivating facilities; draw on the enormous value of resident knowledge acquired by people over years and sometimes decades of working in old plants; and recognize the value of bringing in outside expertise for certain specialized tasks.This approach makes possible discovering the savings that can come when many creative options are pursued persistently and the wisdom of leaving some decisions to the future. The essential job of a deactivation project is to place a facility in a safe, stable, low-maintenance mode, for an interim period. Specific end points are identified to recognize and document this state. Keeping the limited

  9. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  10. Chernobyl: closure by 2000

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Discussions on the future of the Chernobyl nuclear plant between the Ukrainian government, the Group of Seven Industrial nations (GT) and the European Union (EU) are summarized. At the G7 meeting, a timetable for the closure of the entire station by 2000 was presented by Ukrainian officials. The timetable depends on financial commitments from Western governments. Without these, the project would take 10 to 15 years. Following this meeting, which took place on 16-17th May 1995. EU finance ministers authorized release of a ECU 85 million loan. On 23 May, the European Parliament's Committee on Research, Technology and Energy held a public hearing on the Chernobyl station. The primary topic was a feasibility study on the clean-up of Chernobyl 4 and plans for the sarcophagus. Other matters discussed included the effect of the delays and indecision in settling the plants's future. Safety improvements being made to other RBMKs were not being carried out at Chernobyl because of the expected closure. The replacement of the power now supplied to the Ukraine by the Chernobyl reactors is also an issue. The solution favoured by the Ukraine is to being on-line three VVER-1000s that are currently close to completion. Western governments find this solution difficult to accept, however. (UK)

  11. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    International Nuclear Information System (INIS)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    2013-01-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  12. Applying Lean Concepts to Waste Site Closure - 13137

    International Nuclear Information System (INIS)

    Proctor, M.L.

    2013-01-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  13. Applying Lean Concepts to Waste Site Closure - 13137

    Energy Technology Data Exchange (ETDEWEB)

    Proctor, M.L. [Washington Closure Hanford, 2620 Fermi, Richland, Washington 99354 (United States)

    2013-07-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  14. Tubular closure device

    International Nuclear Information System (INIS)

    Klahn, F.C.; Nolan, J.H.; Wills, C.

    1982-01-01

    This invention relates to a closure mechanism for closing openings such as the bore of a conduit and for releasably securing members within the bore. More particularly, this invention relates to a closure mechanism for tubular irradiation surveillance specimen assembly holders used in nuclear reactors

  15. Library 101: Why, How, and Lessons Learned

    Science.gov (United States)

    Porter, Michael; King, David Lee

    2010-01-01

    This article describes how and why the Library 101 Project was created and the lessons that the developers learned out of this project. The Library 101 is a project that challenges librarians to revise the paradigm of "basic" library services in order to remain relevant in this technology-driven world. It was developed by Michael Porter,…

  16. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  17. Progress and Lessons Learned in Transuranic Waste Disposition at The Department of Energy's Advanced Mixed Waste Treatment Project

    Energy Technology Data Exchange (ETDEWEB)

    J.D. Mousseau; S.C. Raish; F.M. Russo

    2006-05-18

    This paper provides an overview of the Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) located at the Idaho National Laboratory (INL) and operated by Bechtel BWXT Idaho, LLC(BBWI) It describes the results to date in meeting the 6,000-cubic-meter Idaho Settlement Agreement milestone that was due December 31, 2005. The paper further describes lessons that have been learned from the project in the area of transuranic (TRU) waste processing and waste certification. Information contained within this paper would be beneficial to others who manage TRU waste for disposal at the Waste Isolation Pilot Plant (WIPP).

  18. Constellation Program Lessons Learned. Volume 2; Detailed Lessons Learned

    Science.gov (United States)

    Rhatigan, Jennifer; Neubek, Deborah J.; Thomas, L. Dale

    2011-01-01

    These lessons learned are part of a suite of hardware, software, test results, designs, knowledge base, and documentation that comprises the legacy of the Constellation Program. The context, summary information, and lessons learned are presented in a factual format, as known and described at the time. While our opinions might be discernable in the context, we have avoided all but factually sustainable statements. Statements should not be viewed as being either positive or negative; their value lies in what we did and what we learned that is worthy of passing on. The lessons include both "dos" and "don ts." In many cases, one person s "do" can be viewed as another person s "don t"; therefore, we have attempted to capture both perspectives when applicable and useful. While Volume I summarizes the views of those who managed the program, this Volume II encompasses the views at the working level, describing how the program challenges manifested in day-to-day activities. Here we see themes that were perhaps hinted at, but not completely addressed, in Volume I: unintended consequences of policies that worked well at higher levels but lacked proper implementation at the working level; long-term effects of the "generation gap" in human space flight development, the need to demonstrate early successes at the expense of thorough planning, and the consequences of problems and challenges not yet addressed because other problems and challenges were more immediate or manifest. Not all lessons learned have the benefit of being operationally vetted, since the program was cancelled shortly after Preliminary Design Review. We avoid making statements about operational consequences (with the exception of testing and test flights that did occur), but we do attempt to provide insight into how operational thinking influenced design and testing. The lessons have been formatted with a description, along with supporting information, a succinct statement of the lesson learned, and

  19. CIRSE Vascular Closure Device Registry

    NARCIS (Netherlands)

    Reekers, Jim A.; Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2011-01-01

    Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. The CIRSE registry of closure devices

  20. Propensity Score-Based Analysis of Percutaneous Closure Versus Medical Therapy in Patients With Cryptogenic Stroke and Patent Foramen Ovale: The IPSYS Registry (Italian Project on Stroke in Young Adults).

    Science.gov (United States)

    Pezzini, Alessandro; Grassi, Mario; Lodigiani, Corrado; Patella, Rosalba; Gandolfo, Carlo; Zini, Andrea; DeLodovici, Maria Luisa; Paciaroni, Maurizio; Del Sette, Massimo; Toriello, Antonella; Musolino, Rossella; Calabrò, Rocco Salvatore; Bovi, Paolo; Adami, Alessandro; Silvestrelli, Giorgio; Sessa, Maria; Cavallini, Anna; Marcheselli, Simona; Marco Bonifati, Domenico; Checcarelli, Nicoletta; Tancredi, Lucia; Chiti, Alberto; Del Zotto, Elisabetta; Tomelleri, Giampaolo; Spalloni, Alessandra; Giorli, Elisa; Costa, Paolo; Giacalone, Giacomo; Ferrazzi, Paola; Poli, Loris; Morotti, Andrea; Piras, Valeria; Rasura, Maurizia; Simone, Anna Maria; Gamba, Massimo; Cerrato, Paolo; Zedde, Maria Luisa; Micieli, Giuseppe; Melis, Maurizio; Massucco, Davide; Guido, Davide; De Giuli, Valeria; Bonaiti, Silvia; D'Amore, Cataldo; La Starza, Sara; Iacoviello, Licia; Padovani, Alessandro

    2016-09-01

    We sought to compare the benefit of percutaneous closure to that of medical therapy alone for the secondary prevention of embolism in patients with patent foramen ovale (PFO) and otherwise unexplained ischemic stroke, in a propensity scored study. Between 2000 and 2012, we selected consecutive first-ever ischemic stroke patients aged 18 to 45 years with PFO and no other cause of brain ischemia, as part of the IPSYS registry (Italian Project on Stroke in Young Adults), who underwent either percutaneous PFO closure or medical therapy for comparative analysis. Primary end point was a composite of ischemic stroke, transient ischemic attack, or peripheral embolism. Secondary end point was brain ischemia. Five hundred and twenty-one patients qualified for the analysis. The primary end point occurred in 15 patients treated with percutaneous PFO closure (7.3%) versus 33 patients medically treated (10.5%; hazard ratio, 0.72; 95% confidence interval, 0.39-1.32; P=0.285). The rates of the secondary end point brain ischemia were also similar in the 2 treatment groups (6.3% in the PFO closure group versus 10.2% in the medically treated group; hazard ratio, 0.64; 95% confidence interval, 0.33-1.21; P=0.168). Closure provided a benefit in patients aged 18 to 36 years (hazard ratio, 0.19; 95% confidence interval, 0.04-0.81; P=0.026) and in those with a substantial right-to-left shunt size (hazard ratio, 0.19; 95% confidence interval, 0.05-0.68; P=0.011). PFO closure seems as effective as medical therapy for secondary prevention of cryptogenic ischemic stroke. Whether device treatment might be more effective in selected cases, such as in patients younger than 37 years and in those with a substantial right-to-left shunt size, deserves further investigation. © 2016 American Heart Association, Inc.

  1. Maxey Flats low-level waste disposal site closure activities

    International Nuclear Information System (INIS)

    Haight, C.P.; Mills, D.; Razor, J.E.

    1987-01-01

    The Maxey Flats Radioactive Waste Disposal Facility in Fleming County, Kentucky is in the process of being closed. The facility opened for commercial business in the spring of 1963 and received approximately 4.75 million cubic feet of radioactive waste by the time it was closed in December of 1977. During fourteen years of operation approximately 2.5 million curies of by-product material, 240,000 kilograms of source material, and 430 kilograms of special nuclear material were disposed. The Commonwealth purchased the lease hold estate and rights in May 1978 from the operating company. This action was taken to stabilize the facility and prepare it for closure consisting of passive care and monitoring. To prepare the site for closure, a number of remedial activities had to be performed. The remediation activities implemented have included erosion control, surface drainage modifications, installation of a temporary plastic surface cover, leachate removal, analysis, treatment and evaporation, US DOE funded evaporator concentrates solidification project and their on-site disposal in an improved disposal trench with enhanced cover for use in a humid environment situated in a fractured geology, performance evaluation of a grout injection demonstration, USGS subsurface geologic investigation, development of conceptual closure designs, and finally being added to the US EPA National Priority List for remediation and closure under Superfund. 13 references, 3 figures

  2. Demonstrating the sealing of a deep geologic repository: the RECAP project

    International Nuclear Information System (INIS)

    Kuzyk, G.W.; Dixon, D.A.; Martino, J.B.; Kozak, E.T.; Bilinsky, D.M.; Thompson, P.M.

    2006-01-01

    Atomic Energy of Canada Limited (AECL) has operated an Underground Research Laboratory (URL) for twenty-three years (1982-2005). The URL was designed and constructed to carry out in situ geotechnical R and D needed for the Canadian Nuclear Fuel Waste Management program. The facility is now being closed, the final of several phases that have included siting, site evaluation, construction and operation. The closure phase presents a unique opportunity to develop and demonstrate the methodologies needed for closure and site restoration of a deep geologic repository for used nuclear fuel. A wealth of technical background and characterization data, dating back to before the first excavation work was carried out, are available to support closure activities. A number of closure-related activities are being proposed as part of a REpository Closure And Post-closure (RECAP) project. The RECAP project is proposed to include demonstrations of shaft and borehole sealing and monitoring as well as fracture sealing (grouting), room closure and monitoring system decommissioning, all activities that would occur when closing an actual repository. In addition to the closure-related activities, the RECAP project could provide a unique opportunity to conduct intrusion-monitoring demonstrations as part of a repository safeguards demonstration. (author)

  3. Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Reedlunn, Benjamin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

  4. Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Reedlunn, Benjamin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-09-27

    Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

  5. Boosting innovation in the water sector--the role and lessons learned from collaborative projects.

    Science.gov (United States)

    Alegre, H; Coelho, S T; Feliciano, J F; Matos, R

    2015-01-01

    A key worldwide challenge in most sectors is to boost the effective adoption of innovation, as underpinned by the new European Union research programme Horizon 2020, which focuses on increasing innovation in Europe from 2014 to 2020. This is particularly relevant in the water sector, often perceived as conservative and averse to change. This paper discusses the role that collaborative knowledge-transfer projects can play in effectively rolling out R&D in the water industry. LNEC (Laboratório Nacional de Engenharia Civil) has designed a structured model based on a phased programme and a network of utilities and researchers. The paper presents the core principles, the rationale, the model and methods used, and the theoretical background, as well as the project's impact, outcomes and products. The discussion highlights the lessons learnt and provides a formal analysis of the advantages of focusing on middle management as an effective entry point, even if innovation is needed across the organization. Making training materials, guidelines, use cases, data and software publicly available after the project's end has proven to have a decisive multiplying effect. The paper also argues in favour of the collaborative model as a basis for R&D sustainability, and details on-going and planned developments.

  6. TMI-2: Lessons learned by the US Department of Energy: A programmatic perspective

    International Nuclear Information System (INIS)

    Schmitt, R.C.; Reno, H.W.; Bentley, K.J.; Owens, D.E.

    1990-03-01

    This report is a summary of the lessons learned by the US Department of Energy during its decade-long participation in the research and accident cleanup project at Three Mile Island Nuclear Power Station Unit 2 near Harrisburg, Pennsylvania. It is based on a review of a wide range of project documents and interviews with personnel from the many organizations involved. The lessons are organized into major subjects with a brief background section to orient the reader to that subject. The subjects are divided into sub-topics, each with a brief discussion and a series of lessons learned. The lessons are very brief and each is preceded with a keyword phrase to highlight its specific topic. References are given so that the details of the subject and the lesson can be further investigated. 99 refs., 24 figs

  7. Development of a harmonized approach to safety assessment of decommissioning: Lessons learned from international experience (DeSa project)

    International Nuclear Information System (INIS)

    Percival, K.; Nokhamzon, J.-G.; Ferch, R.; Batandjieva, B.

    2006-01-01

    The number of nuclear facilities being or planned to be shutdown as they reach the end of their design life, due to accidents or other political and social factors has been increasing worldwide. This has led to an increase in the awareness of regulators and operators of the importance of development and implementation of adequate safety requirements and criteria for decommissioning of these facilities. A general requirement at international and national levels, even for new facilities to be commissioned, is the development of a decommissioning plan, which includes evaluation of potential radiological consequences to public and workers during planned and accidental decommissioning activities. Experience has been gained in the safety assessment of decommissioning at various sites with different complexities and hazard potentials. This experience shows that various approaches have been used in conducting safety assessments and that there is a need for harmonisation of these approaches and for transferring the good practice and lessons learned to other countries, in particular developing countries with limited financial and human resources. The IAEA launched an international project on Evaluation and Demonstration of Safety during Decommissioning (DeSa) in 2004 to provide a forum for exchange of lessons learned between site operators, regulators, safety assessors and other specialists in safety assessment of decommissioning of nuclear power plants, research reactors, laboratories, nuclear fuel cycle facilities, etc. This paper presents the lessons learned through the project up to date, i.e.; (i) a common approach to safety assessment is being applied worldwide with the following steps - establishment of assessment framework; description of the facility; definition of decommissioning activities; hazard identification and analysis; calculation of consequences; and analysis of results; (ii) a deterministic approach to safety assessment is most commonly applied; (iii) a

  8. Innovation in the management of lessons learned in an IT project with the adoption of social media

    Directory of Open Access Journals (Sweden)

    Roberto Winter

    2017-03-01

    Full Text Available This research explores the gap in the management of lessons learned (MLL in an Information Technology project (IT, validating a model (named Target with the support of a wiki platform in a medium-sized company in the IT industry. This model supports the following MLL processes: awareness, collection, verification, storage, dissemination and reuse. This study adopts the paradigm of the Design Science Research and the Technical Action Research method to instantiate the Target model in the implementation phase of an IT project. The theoretical contribution lies in the practical utility of an LL model, which was validated in the field promoting innovation in the MLL. The practical implications can be seen in the company's learning to introduce the MLL, improve design productivity, increase employee collaboration and better disseminate knowledge.

  9. Safety of Percutaneous Patent Ductus Arteriosus Closure: An Unselected Multicenter Population Experience

    Science.gov (United States)

    El‐Said, Howaida G.; Bratincsak, Andras; Foerster, Susan R.; Murphy, Joshua J.; Vincent, Julie; Holzer, Ralf; Porras, Diego; Moore, John; Bergersen, Lisa

    2013-01-01

    Background The technique and safety of transcatheter patent ductus arteriosus (PDA) closure have evolved during the past 20 years. We sought to report a multicenter experience of PDA closure with a focus on the rate of adverse events (AE) and a review of institutional practice differences. Methods and Results Outcome data on transcatheter PDA closure were collected at 8 centers prospectively using a multicenter registry (Congenital Cardiac Catheterization Project on Outcome Registry). Between February 2007 and June 2010, 496 PDA closures were recorded using a device in 338 (68%) or coils in 158 (32%). Most patients had an isolated PDA (90%). Fifty percent of patients were between 6 months and 3 years old, with only 40 patients (8%) closure and 1 mm (range 0.5 to 6 mm; IQR 1 to 2 mm) for coil closure (P2 mm (all P1.5 mm. In 9% of cases (n=46), an AE occurred; however, only 11 (2%) were classified as high severity. Younger age was associated with a higher AE rate. Coil‐related AEs were more common than device‐related AEs (10% versus 2%, Pclosure in the present era has a very low rate of complications, although these are higher in younger children. Technical intervention‐related events were more common in coil procedures compared with device procedures. For PDAs ≤2.5 mm in diameter, institutional differences in preference for device versus coil exist. PMID:24284214

  10. Lessons Learnt on Rain Forest Management for Wood Production in ...

    African Journals Online (AJOL)

    The study was carried out with the aim of analyzing and establishing what lessons have been learnt from positive and negative experiences of various initiatives, projects and programmes aiming at sustainable management, use and conservation of rain forests in Sub-Saharan Africa. The lessons learnt from the case ...

  11. Observations on early and delayed colostomy closure.

    Science.gov (United States)

    Tade, A O; Salami, B A; Ayoade, B A

    2011-06-01

    Traditional treatment of a variety of colorectal pathologies had included a diverting colostomy that was closed eight or more weeks later during a readmission. The aim of this retrospective study was to determine the outcomes of early colostomy closure and delayed colostomy closure in patients with temporary colostomies following traumatic and non-traumatic colorectal pathologies. In this study early colostomy closure was the closure of a colostomy within three weeks of its construction, while delayed colostomy closure referred to closure after 3 weeks. Complete records of the 37 adult patients who had temporary colostomy constructed and closed between Jan. 1997 December 2003 for various colorectal pathologies were studied. Fourteen patients had early colostomy closure while 23 had delayed closure. In the early colostomy closure group there were 10 men and 4 women. The mean age of the patients was 28yr with a range of 18-65yr. Colostomies were closed 9-18 days after initial colostomy construction. There was no mortality. Morbidity rate 28.6% (4 out of 14). There were two faecal fistulas (14.3%). Twenty-three patients had delayed colostomy closure 8 weeks to 18 months after initial colostomy construction. These were patients unfit for early surgery after initial colostomy construction because of carcinoma, significant weight loss, or sepsis. There was no mortality. Morbidity rate was 26.1%. There were 3 faecal fistulas (13.2%). Outcomes following early colostomy closure and delayed closure were comparable. Patients fit for surgery should have early closure whilst patients who may have compromised health should have delayed closure.

  12. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    Energy Technology Data Exchange (ETDEWEB)

    Post, Thomas C. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); Strom, Dean [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States); Beulow, Laura [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)

    2013-07-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  13. Learning from Lessons: studying the structure and construction of mathematics teacher knowledge in Australia, China and Germany

    Science.gov (United States)

    Chan, Man Ching Esther; Clarke, David J.; Clarke, Doug M.; Roche, Anne; Cao, Yiming; Peter-Koop, Andrea

    2018-03-01

    The major premise of this project is that teachers learn from the act of teaching a lesson. Rather than asking "What must a teacher already know in order to practice effectively?", this project asks "What might a teacher learn through their activities in the classroom and how might this learning be optimised?" In this project, controlled conditions are created utilising purposefully designed and trialled lesson plans to investigate the process of teacher knowledge construction, with teacher selective attention proposed as a key mediating variable. In order to investigate teacher learning through classroom practice, the project addresses the following questions: To what classroom objects, actions and events do teachers attend and with what consequence for their learning? Do teachers in different countries attend to different classroom events and consequently derive different learning benefits from teaching a lesson? This international project combines focused case studies with an online survey of mathematics teachers' selective attention and consequent learning in Australia, China and Germany. Data include the teacher's adaptation of a pre-designed lesson, the teacher's actions during the lesson, the teacher's reflective thoughts about the lesson and, most importantly, the consequences for the planning and delivery of a second lesson. The combination of fine-grained, culturally situated case studies and large-scale online survey provides mutually informing benefits from each research approach. The research design, so constituted, offers the means to a new and scalable vision of teacher learning and its promotion.

  14. Sternal exploration or closure

    Science.gov (United States)

    VAC - vacuum-assisted closure - sternal wound; Sternal dehiscence; Sternal infection ... in the wound to look for signs of infection Remove dead or infected ... use a VAC (vacuum-assisted closure) dressing. It is a negative ...

  15. Lessons Learnt in the Development of Level 1 PUSPATI TRIGA Reactor Probability Safety Assessment: A Collaboration Project under the Norwegian Extra Budgetary Fund

    International Nuclear Information System (INIS)

    Mazleha Maskin; Tom, P.P.; Ahmad Hassan Sallehudin Mohd Sarif; Faizal Mohamed; Mohd Fazli Zakaria; Muhamad Puad Abu

    2014-01-01

    This article reports about the lessons learnt from the development of level 1 probabilistic safety assessment (PSA) project that was implemented under the IAEA mentoring program for TRIGA MARK II PUSPATI research reactor (RTP). As a project that involved more than 3 organizations, a strategic planning of the management and implementation of individual assignment is truly a hectic task. This report compiles all related activities from the forming of the Malaysian PSA team up to the final report submitted to the IAEA. (author)

  16. Lessons from previous 'coal Transitions'. High-level summary for decision-makers, Part of 'Coal Transitions: Research and Dialogue on the Future of Coal' Project

    International Nuclear Information System (INIS)

    Caldecott, Ben; Sartor, Oliver; Spencer, Thomas

    2017-01-01

    The need for a so-called 'just transition' is acknowledged, away from carbon intensive activities, such as coal production and use. But what might a just transition look like in practice? What specific risks need to be managed and what are the best approaches to managing them? There is an urgent need to develop a deeper understanding of these issues. It is to this need that this report tries to respond. It provides a summary of lessons from six historical case studies of regional coal mining transitions that have occurred or are ongoing in Europe and the United States in recent decades. These case studies and this report were developed as part of a broader project led by IDDRI and Climate Strategies, entitled 'Coal Transitions: Research and Dialogue on the Future of Coal'. This project seeks to utilise these historical lessons to facilitate the development of feasible coal transition scenarios in large coal producing countries today'

  17. Full closure strategic analysis.

    Science.gov (United States)

    2014-07-01

    The full closure strategic analysis was conducted to create a decision process whereby full roadway : closures for construction and maintenance activities can be evaluated and approved or denied by CDOT : Traffic personnel. The study reviewed current...

  18. Crack closure, a literature study

    Science.gov (United States)

    Holmgren, M.

    1993-08-01

    In this report crack closure is treated. The state of the art is reviewed. Different empirical formulas for determining the crack closure are compared with each other, and their benefits are discussed. Experimental techniques for determining the crack closure stress are discussed, and some results from fatigue tests are also reported. Experimental data from the literature are reported.

  19. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  20. Lessons learned from the NRU vessel leak repair and return to service projects

    International Nuclear Information System (INIS)

    Heeney, P.; Turcotte, J.

    2011-01-01

    In May 2009 the National Research Universal (NRU) reactor was shut down due to a small leak detected from the reactor vessel into the annulus surrounding the reactor. What ensued was a challenging, yet successful, 15 month long Repair and Return to Service Outage. This Repair and Return to Service Outage presented many first-of-a-kind challenges that provide learning opportunities which have been incorporated into subsequent planned outages. These lessons learned are invaluable tools to be used in the planning and execution of future outages. Following the repair of the NRU vessel, AECL was required to conduct annual inspections of the vessel wall. These inspections require an annual Extended Outage (up to 4 weeks in length). A planned Extended Outage was conducted in May/June 2011 and provided an opportunity to implement some of the lessons learned during the Repair and Return to Service Outage. Lessons learned from that Extended Outage have been incorporated in the subsequent monthly maintenance outages, with lessons learned sessions being held after each outage to ensure that the execution of outages is constantly improving. (author)

  1. Simulating classroom lessons : an agent-based attempt

    OpenAIRE

    Ingram, Fred; Brooks, Roger John

    2018-01-01

    This is an interim report on a project to construct an agent-based simulation that reproduces some of the interactions between students and their teacher in classroom lessons. In a pilot study, the activities of 67 students and 7 teachers during 40 lessons were recorded using a data collection instrument that currently captures 17 student states and 15 teacher states. These data enabled various conceptual models to be explored, providing empirical values and distributions for the model parame...

  2. Scalp Wound Closure with K wires: An alternative easier method to scalp wound closure.

    Science.gov (United States)

    Ramesh, S; Ajik, S

    2012-12-01

    Scalp defects and lacerations present a reconstructive challenge to plastic surgeons. Many methods have been described from the use of skin grafting to rotation flaps. Here we present a method of closure of a contaminated scalp wound with the use of Kirschner wires. In our case, closure of scalp laceration was made possible with the use of 1.4 Kirschner wires and cable tie/ zip tie fasteners. The duration to closure of wound was 10 days. In reconstructing the scalp defect, this method was found to adhere to principles of scalp reconstruction. There were no post operative complications found from the procedure. On initial application on the edge of the wound, tension applied caused the K wires to cut through the wound edge. On replacement of K wires 1cm away from wound edge the procedure was not plagued by any further complication. In conclusion we find scalp closure with Kirschner wires are a simple and effective method for scalp wound closure.

  3. Revisit to Grad's Closure and Development of Physically Motivated Closure for Phenomenological High-Order Moment Model

    International Nuclear Information System (INIS)

    Myong, R. S.; Nagdewe, S. P.

    2011-01-01

    The Grad's closure for the high-order moment equation is revisited and, by extending his theory, a physically motivated closure is developed for the one-dimensional velocity shear gas flow. The closure is based on the physical argument of the relative importance of various terms appearing in the moment equation. Also, the closure is derived such that the resulting theory may be inclusive of the well established linear theory (Navier-Stokes-Fourier) as limiting case near local thermal equilibrium.

  4. Economic analysis of radioactive waste storage and disposal projects

    International Nuclear Information System (INIS)

    Kleinen, P.J.; Starnes, R.B.

    1995-01-01

    Radioactive waste storage and disposal efforts present challenging issues for cost and economic analyses. In particular, legal requirements for states and compact areas to develop radioactive waste disposal sites, combined with closure of some sites, have placed urgency on planning, locating, and constructing storage and disposal sites. Cost analyses of potential projects are important to the decision processes. Principal objectives for cost analyses for projects are to identify all activities, covering the entire project life cycle, and to develop costs for those activities using methods that allow direct comparisons between competing project alternatives. For radioactive waste projects, long project lives ranging from tens of years to 100 or more years must be considered. Alternative, and competing, technologies, designs, and operating plans must be evaluated. Thorough base cost estimates must be made for all project phases: planning, development, licensing/permitting, construction, operations, and maintenance, closure, and post-closure/institutional care. Economic analysis procedures need to accommodate the specific features of each project alternative and facilitate cost comparisons between differing alternatives. Economic analysis assumptions must be developed to address the unusually long project lives involved in radioactive waste projects

  5. A Case Study in Competitive Technical and Market Intelligence Support and Lessons Learned for the uChemLab LDRD Grand Challenge Project; TOPICAL

    International Nuclear Information System (INIS)

    SOUTHWELL, EDWIN T.; GARCIA, MARIE L.; MEYERS, CHARLES E.

    2001-01-01

    The(mu)ChemLab(trademark) Laboratory Directed Research and Development (LDRD) Grand Challenge project began in October 1996 and ended in September 2000. The technical managers of the(mu)ChemLab(trademark) project and the LDRD office, with the support of a consultant, conducted a competitive technical and market demand intelligence analysis of the(mu)ChemLab(trademark). The managers used this knowledge to make project decisions and course adjustments. CTI/MDI positively impacted the project's technology development, uncovered potential technology partnerships, and supported eventual industry partner contacts. CTI/MDI analysis is now seen as due diligence and the(mu)ChemLab(trademark) project is now the model for other Sandia LDRD Grand Challenge undertakings. This document describes the CTI/MDI analysis and captures the more important ''lessons learned'' of this Grand Challenge project, as reported by the project's management team

  6. Closure of population biobanks and direct-to-consumer genetic testing companies.

    Science.gov (United States)

    Zawati, Ma'n H; Borry, Pascal; Howard, Heidi Carmen

    2011-09-01

    Genetic research gained new momentum with the completion of the Human Genome Project in 2003. Formerly centered on the investigation of single-gene disorders, genetic research is increasingly targeting common complex diseases and in doing so is studying the whole genome, the environment and its impact on genomic variation. Consequently, biobanking initiatives have emerged around the world as a tool to sustain such progress. Whether they are small scale or longitudinal, public or private, commercial or non-commercial, biobanks should consider the possibility of closure. Interestingly, while raising important ethical issues, this topic has hardly been explored in the literature. Indeed, ethical issues associated with sale, insolvency, end of funding, or transfer of materials to other entities (which are all issues either related to or possible consequences of closure) are seldom the subject of discussion. In an attempt to fill this gap, this paper will discuss-using population and direct-to-consumer (DTC) genetic testing companies' biobanks as case studies-(1) international and national normative documents addressing the issue of closure and (2) the internal policies of population biobanks and DTC genetic testing companies. The analysis will inform the debate on biobank closure and elucidate the underlying ethical issues, which include, but are not limited to informed consent, storage and privacy.

  7. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  8. Nevada Test Site closure program

    International Nuclear Information System (INIS)

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use

  9. Design Lessons Drawn from the Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    2011-05-01

    This report provides an updated compilation incorporating the most recent lessons learned from decommissioning and remediation projects. It is intended as a 'road map' to those seeking to apply these lessons. The report presents the issues in a concise and systematic manner, along with practical, thought-provoking examples. The most important lessons learned in recent years are organized and examined to enable the intended audience to gauge the importance of this aspect of the planning for new nuclear facilities. These will be of special interest to those seeking to construct nuclear facilities for the first time. In Sections 1 and 2, the current situation in the field of decommissioning is reviewed and the relevance and importance of beneficial design features is introduced. A more detailed review of previous and current lessons learned from decommissioning is given in Section 3 where different aspects of the decommissioning process are analysed. From this analysis beneficial design features have been extracted and identified in Section 4 which includes two comprehensive tables where brief descriptions of the features are summarized and responsibilities are identified. Conclusions and key design features and key recommendations are given in Section 5. Two Annexes are included to provide lessons from past projects and past experience and to record notes and extracts taken from a comprehensive list of publications listed in the References on page 47.

  10. Evaluation of a novel trocar-site closure and comparison with a standard Carter-Thomason closure device.

    Science.gov (United States)

    del Junco, Michael; Okhunov, Zhamshid; Juncal, Samuel; Yoon, Renai; Landman, Jaime

    2014-07-01

    The aim of this study was to evaluate and compare a novel trocars-site closure device, the WECK EFx™ Endo Fascial Closure System (EFx) with the Carter-Thomason CloseSure System® (CT) for the closure of laparoscopic trocar site defects created by a 12-mm dilating trocar. We created standardized laparoscopic trocars-site abdominal wall defects in cadaver models using a standard 12-mm laparoscopic dilating trocar. Trocar defects were closed in a randomized fashion using one of the two closure systems. We recorded time and number of attempts needed for complete defect closure. In addition, we recorded the ability to maintain pneumoperitoneum, endoscopic visualization, safety, security, and facility based on the surgeon's subjective evaluations. We compared outcomes for the EFx and CT closure systems. We created 72 standardized laparoscopic trocars-site abdominal wall defects. The mean time needed for complete defect closure was 98.53 seconds (±28.9) for the EFx compared with 133.61 seconds (±54.61) for the CT (Psafety were 2.92 for EFx vs 2.19 for CT (Pvs 1.83 for EFx and CT, respectively (Pvs 2.33 for CT (P=0.022). No significant difference was observed between the EFx and the CT systems for endoscopic visualization (2.28 vs 2.50, P=0.080). In this in vitro cadaver trial, the EFx was superior in terms of time needed to complete defect closure, safety, and facility. CT was superior in terms of maintenance of pneumoperitoneum. Both systems were equal in the number of attempts needed to complete the defect closure and endoscopic visualization.

  11. Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300

    International Nuclear Information System (INIS)

    MacDonnell, B.A.; Obenauf, K.S.

    1996-08-01

    The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline

  12. Defense Base Realignment and Closure Budget Data for the Realignment of the Bureau of Naval Personnel, Washington, D.C., to Naval Air Station Memphis, Tennessee

    National Research Council Canada - National Science Library

    Granetto, Paul

    1995-01-01

    ... requested for each military construction project associated with Defense base realignment and closure does not exceed the original estimated cost provided to the Commission on Defense Base Closure and Realignment (the Commission...

  13. Occupancy estimation and the closure assumption

    Science.gov (United States)

    Rota, Christopher T.; Fletcher, Robert J.; Dorazio, Robert M.; Betts, Matthew G.

    2009-01-01

    1. Recent advances in occupancy estimation that adjust for imperfect detection have provided substantial improvements over traditional approaches and are receiving considerable use in applied ecology. To estimate and adjust for detectability, occupancy modelling requires multiple surveys at a site and requires the assumption of 'closure' between surveys, i.e. no changes in occupancy between surveys. Violations of this assumption could bias parameter estimates; however, little work has assessed model sensitivity to violations of this assumption or how commonly such violations occur in nature. 2. We apply a modelling procedure that can test for closure to two avian point-count data sets in Montana and New Hampshire, USA, that exemplify time-scales at which closure is often assumed. These data sets illustrate different sampling designs that allow testing for closure but are currently rarely employed in field investigations. Using a simulation study, we then evaluate the sensitivity of parameter estimates to changes in site occupancy and evaluate a power analysis developed for sampling designs that is aimed at limiting the likelihood of closure. 3. Application of our approach to point-count data indicates that habitats may frequently be open to changes in site occupancy at time-scales typical of many occupancy investigations, with 71% and 100% of species investigated in Montana and New Hampshire respectively, showing violation of closure across time periods of 3 weeks and 8 days respectively. 4. Simulations suggest that models assuming closure are sensitive to changes in occupancy. Power analyses further suggest that the modelling procedure we apply can effectively test for closure. 5. Synthesis and applications. Our demonstration that sites may be open to changes in site occupancy over time-scales typical of many occupancy investigations, combined with the sensitivity of models to violations of the closure assumption, highlights the importance of properly addressing

  14. Eyelid closure at death

    Directory of Open Access Journals (Sweden)

    A D Macleod

    2009-01-01

    Full Text Available Aim: To observe the incidence of full or partial eyelid closure at death. Materials and Methods: The presence of ptosis was recorded in 100 consecutive hospice patient deaths. Results: Majority (63% of the patients died with their eyes fully closed, however, 37% had bilateral ptosis at death, with incomplete eye closure. In this study, central nervous system tumor involvement and/or acute hepatic encephalopathy appeared to be pre-mortem risk factors of bilateral ptosis at death. Conclusion: Organicity and not psychogenicity is, therefore, the likely etiology of failure of full eyelid closure at death.

  15. Defense Base Realignment and Closure Budget Data for the Closure of Gentile Air Force Station, Dayton, Ohio, and Realignment of Defense Logistics Agency Components to Wright-Patterson Air Force Base, Ohio

    National Research Council Canada - National Science Library

    1996-01-01

    .... This report provides the results of the audit of two projects, valued at $5.5 million, for the closure of Gentile Air Force Station, Dayton, Ohio, and realignment to Wright-Patterson Air Force Base, Ohio, of two Defense Logistics Agency components...

  16. ICPP tank farm closure study. Volume 2: Engineering design files

    International Nuclear Information System (INIS)

    1998-02-01

    Volume 2 contains the following topical sections: Tank farm heel flushing/pH adjustment; Grouting experiments for immobilization of tank farm heel; Savannah River high level waste tank 20 closure; Tank farm closure information; Clean closure of tank farm; Remediation issues; Remote demolition techniques; Decision concerning EIS for debris treatment facility; CERCLA/RCRA issues; Area of contamination determination; Containment building of debris treatment facility; Double containment issues; Characterization costs; Packaging and disposal options for the waste resulting from the total removal of the tank farm; Take-off calculations for the total removal of soils and structures at the tank farm; Vessel off-gas systems; Jet-grouted polymer and subsurface walls; Exposure calculations for total removal of tank farm; Recommended instrumentation during retrieval operations; High level waste tank concrete encasement evaluation; Recommended heavy equipment and sizing equipment for total removal activities; Tank buoyancy constraints; Grout and concrete formulas for tank heel solidification; Tank heel pH requirements; Tank cooling water; Evaluation of conservatism of vehicle loading on vaults; Typical vault dimensions and approximately tank and vault void volumes; Radiological concerns for temporary vessel off-gas system; Flushing calculations for tank heels; Grout lift depth analysis; Decontamination solution for waste transfer piping; Grout lift determination for filling tank and vault voids; sprung structure vendor data; Grout flow properties through a 2--4 inch pipe; Tank farm load limitations; NRC low level waste grout; Project data sheet calculations; Dose rates for tank farm closure tasks; Exposure and shielding calculations for grout lines; TFF radionuclide release rates; Documentation of the clean closure of a system with listed waste discharge; and Documentation of the ORNL method of radionuclide concentrations in tanks

  17. ICPP tank farm closure study. Volume 2: Engineering design files

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Volume 2 contains the following topical sections: Tank farm heel flushing/pH adjustment; Grouting experiments for immobilization of tank farm heel; Savannah River high level waste tank 20 closure; Tank farm closure information; Clean closure of tank farm; Remediation issues; Remote demolition techniques; Decision concerning EIS for debris treatment facility; CERCLA/RCRA issues; Area of contamination determination; Containment building of debris treatment facility; Double containment issues; Characterization costs; Packaging and disposal options for the waste resulting from the total removal of the tank farm; Take-off calculations for the total removal of soils and structures at the tank farm; Vessel off-gas systems; Jet-grouted polymer and subsurface walls; Exposure calculations for total removal of tank farm; Recommended instrumentation during retrieval operations; High level waste tank concrete encasement evaluation; Recommended heavy equipment and sizing equipment for total removal activities; Tank buoyancy constraints; Grout and concrete formulas for tank heel solidification; Tank heel pH requirements; Tank cooling water; Evaluation of conservatism of vehicle loading on vaults; Typical vault dimensions and approximately tank and vault void volumes; Radiological concerns for temporary vessel off-gas system; Flushing calculations for tank heels; Grout lift depth analysis; Decontamination solution for waste transfer piping; Grout lift determination for filling tank and vault voids; sprung structure vendor data; Grout flow properties through a 2--4 inch pipe; Tank farm load limitations; NRC low level waste grout; Project data sheet calculations; Dose rates for tank farm closure tasks; Exposure and shielding calculations for grout lines; TFF radionuclide release rates; Documentation of the clean closure of a system with listed waste discharge; and Documentation of the ORNL method of radionuclide concentrations in tanks.

  18. A User's Guide to the Federal Theater Project.

    Science.gov (United States)

    Sheridan, Frank; Leslie, Linda

    1997-01-01

    Presents a lesson plan constructed around materials found in the User's Guide to the Federal Project. The Federal Theater Project produced radical and populist plays during the Great Depression before being de-funded by a conservative Congress. The lessons include activities and discussion built around the original plays. (MJP)

  19. Scope and closures

    CERN Document Server

    Simpson, Kyle

    2014-01-01

    No matter how much experience you have with JavaScript, odds are you don’t fully understand the language. This concise yet in-depth guide takes you inside scope and closures, two core concepts you need to know to become a more efficient and effective JavaScript programmer. You’ll learn how and why they work, and how an understanding of closures can be a powerful part of your development skillset.

  20. Closure development for high-level nuclear waste containers for the tuff repository

    International Nuclear Information System (INIS)

    Robitz, E.S. Jr.; McAninch, M.D. Jr.; Edmonds, D.P.; Babcock and Wilcox Co., Alliance, OH

    1990-09-01

    This report summarizes Phase 1 activities for closure development of the high-level nuclear waste package task for the tuff repository. Work was conducted under U.S. Department of Energy (DOE) Contract 9172105, administered through the Lawrence Livermore National Laboratory (LLNL), as part of the Yucca Mountain Project (YMP), funded through the DOE Office of Civilian Radioactive Waste Management (OCRWM). The goal of this phase was to select five closure processes for further evaluation in later phases of the program. A decision tree methodology was utilized to perform an objective evaluation of 15 potential closure processes. Information was gathered via a literature survey, industrial contacts, and discussions with project team members, other experts in the field, and the LLNL waste package task staff. The five processes selected were friction welding, electron beam welding, laser beam welding, gas tungsten arc welding, and plasma arc welding. These are felt to represent the best combination of weldment material properties and process performance in a remote, radioactive environment. Conceptual designs have been generated for these processes to illustrate how they would be implemented in practice. Homopolar resistance welding was included in the Phase 1 analysis, and developments in this process will be monitored via literature in Phases 2 and 3. Work was conducted in accordance with the YMP Quality Assurance Program. 223 refs., 20 figs., 9 tabs

  1. Not a geography of what doesn't exist, but a counter-geography of what does: Rereading Giuseppe Dematteis' Le Matafore della Terra

    NARCIS (Netherlands)

    Fall, J.J.; Minca, C.

    2013-01-01

    The shaping of geography as a discipline has been the result of a combination of productive and successful communication and missed opportunities, of presence and absence, of fluid travels of ideas and projects, but also of closures, impediments, good lessons that got lost. This paper suggests that

  2. Lessons Learned from Environmental Remediation Programmes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-03-15

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  3. Lessons Learned from Environmental Remediation Programmes

    International Nuclear Information System (INIS)

    2014-01-01

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  4. Heterogeneous all actinide recycling in LWR all actinide cycle closure concept

    International Nuclear Information System (INIS)

    Tondinelli, Luciano

    1980-01-01

    A project for the elimination of transuranium elements (Waste Actinides, WA) by neutron transmutation is developed in a commercial BWR with U-Pu (Fuel Actinides, FA) recycle. The project is based on the All Actinide Cycle Closure concept: 1) closure of the 'back end' of the fuel cycle, U-Pu coprocessing, 2) waste actinide disposal by neutron transmutation. The reactor core consists of Pu-island fuel assemblies containing WAs in target pins. Two parallel reprocessing lines for FAs and WAs are provided. Mass balance, hazard measure, spontaneous activity during 10 recycles are calculated. Conclusions are: the reduction in All Actinide inventory achieved by Heterogeneous All Actinide Recycling is on the order of 83% after 10 recycles. The U235 enrichment needed for a constant end of cycle reactivity decreases for increasing number of recycles after the 4th recycle. A diffusion-burnup calculation of the pin power peak factors in the fuel assembly shows that design limits can be satisfied. A strong effort should be devoted to the solution of the problems related to high values of spontaneous emission by the target pins

  5. Tubular closure mechanism

    International Nuclear Information System (INIS)

    Kalen, D.D.; Mitchem, J.W.

    1981-01-01

    An apparatus is provided for closing the bore of a tube and releasably securing articles within the tube under longitudinal load. A latching member has a cylindrical section and several circumferentially-spaced elongated latches hanging down from one end of the cylinder. An elongated actuator has integral cam and spline and is partly located within the latch with the cam radially contacting the latches and the spline projecting into the circumferential spaces between the latches. The actuator is axially movable between a position in which the latches are locked to the tube walls and a position in which the latches are secured from contact with the tube walls. Means are provided for axially moving the actuator such that the cam positions the latches; and means are also provided for engaging the articles within the tube. The closure is particularly applicable to tubular irradiation surveillance specimen assembly holders used in reactors

  6. Defense Base Realignment and Closure Budget Data for Realignment of Construction Battalion Unit 416 from Naval Air Station Alameda, California, to Naval Air Station Fallon, Nevada

    National Research Council Canada - National Science Library

    1995-01-01

    ... requested for each military construction project associated with Defense base realignment and closure does not exceed the original estimated cost provided to the Commission on Defense Base Closure and Realignment (the Commission...

  7. 100-D Ponds closure plan. Revision 1

    International Nuclear Information System (INIS)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit is clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure

  8. Pit closures - effects and alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Stott, A G

    1987-02-01

    During the last decade, British Coal has closed around 100 mines. This article illustrates the effect of pit closures on the colliery's workforce, and the local community and its economy. Working conditions at Newmarket Colliery and the Selby coalfield are compared within the context of British Coal's national transfer market. British Coal's transfer benefits include resettlement payments and mortgage subsidies. The job creation venture of British Coal Enterprise Ltd. has helped to create over 3700 new jobs in 264 projects, involving a total investment of 38 M pounds sterling. The article also discusses deputies' qualifications and prospects for recently qualified management staff, and gives a comparison of losses suffered by the different mining unions.

  9. TANK 241-AN-102 MULTI-PROBE CORROSION MONITORING SYSTEM PROJECT LESSONS LEARNED

    International Nuclear Information System (INIS)

    TAYLOR T; HAGENSEN A; KIRCH NW

    2008-01-01

    During 2007 and 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was designed and fabricated for use in double-shell tank 241-AN-102. The system was successfully installed in the tank on May 1, 2008. The 241-AN-102 MPCMS consists of one 'fixed' in-tank probe containing primary and secondary reference electrodes, tank material electrodes, Electrical Resistance (ER) sensors, and stressed and unstressed corrosion coupons. In addition to the fixed probe, the 241-AN-102 MPCMS also contains four standalone coupon racks, or 'removable' probes. Each rack contains stressed and unstressed coupons made of American Society of Testing and Materials A537 CL1 steel, heat-treated to closely match the chemical and mechanical characteristics of the 241-AN-102 tank wall. These coupon racks can be removed periodically to facilitate examination of the attached coupons for corrosion damage. Along the way to successful system deployment and operation, the system design, fabrication, and testing activities presented a number of challenges. This document discusses these challenges and lessons learned, which when applied to future efforts, should improve overall project efficiency

  10. Closure for spent-fuel transport and storage containers

    International Nuclear Information System (INIS)

    Ahner, S.; Knackstedt, H.G.; Srostlik, P.

    1980-01-01

    The container has a transport closure and a shielding closure. This shielding closure consists of two pieces (double closure system), which can be fartened to one another like a bayonet fixing. A central motion of rotation is enough to open the closure. It can be done remote-controlled as well as manually. (DG) [de

  11. Echocardiographic predictors of coil vs device closure in patients undergoing percutaneous patent ductus arteriosus closure.

    Science.gov (United States)

    Roushdy, Alaa; Abd El Razek, Yasmeen; Mamdouh Tawfik, Ahmed

    2018-01-01

    To determine anatomic and hemodynamic echocardiographic predictors for patent ductus arteriosus (PDA) device vs coil closure. Seventy-six patients who were referred for elective transcatheter PDA closure were enrolled in the study. All patients underwent full echocardiogram including measurement of the PDA pulmonary end diameter, color flow width and extent, peak and end-diastolic Doppler gradients across the duct, diastolic flow reversal, left atrial dimensions and volume, left ventricular sphericity index, and volumes. The study group was subdivided into 2 subgroups based on the mode of PDA closure whether by coil (n = 42) or device (n = 34). Using univariate analysis there was a highly significant difference between the 2 groups as regard the pulmonary end diameter measured in both the suprasternal and parasternal short-axis views as well as the color flow width and color flow extent (P closure group had statistically significant higher end-systolic and end-diastolic volumes indexed, left atrial volume, and diastolic flow reversal. Receiver operating characteristic curve analysis showed a pulmonary end diameter cutoff point from the suprasternal view > 2.5 mm and from parasternal short-axis view > 2.61 mm to have the highest balanced sensitivity and specificity to predict the likelihood for device closure (AUC 0.971 and 0.979 respectively). The pulmonary end diameter measured from the suprasternal view was the most independent predictor of device closure. The selection between PDA coil or device closure can be done on the basis of multiple anatomic and hemodynamic echocardiographic variables. © 2017 Wiley Periodicals, Inc.

  12. Analysis of pedagogical communication and interaction of lessons with tablet application

    Directory of Open Access Journals (Sweden)

    Maněnová Martina

    2016-01-01

    Full Text Available The article describes possibilities of lessons evaluation by means of structured observations. Our study took an interest in the use of information and communication technologies in teaching of mathematics on elementary school. Concrete it was case tablets implementation in standard lessons on elementary school. The aim of the submitted project was to find out if tablets application in lessons would influence pedagogical communication and interaction. We selected structured FIAS (Flanders Interaction Analysis system observation as a basic research method. This method was spread on 16 categories in total, which we used for structured observation of lessons. The results were successively processed to interaction characteristics.

  13. Mind the Gap: Lessons from the UK to Brazil about the Roles of TTOs throughout Collaborative R&D Projects

    Directory of Open Access Journals (Sweden)

    Elisa Thomas

    2017-11-01

    Full Text Available The literature about collaboration for innovation has reported fundamental activities performed by intermediaries. In this paper, universities’ technology transfer offices (TTOs are placed as intermediaries between academic research and the industry. Our study focuses on collaborative research and development (R&D projects between universities and industry in order to understand the roles of TTOs throughout the whole duration of the project. The main aim of this paper is to identify the roles of TTOs throughout collaborative R&D projects and suggest some lessons for Brazilian TTOs based on the experience of the United Kingdom. Through qualitative case studies in the United Kingdom and Brazil, the analyses show that both TTOs performed critical activities for collaborative R&D projects. Similar activities at both TTOs were the management of partnerships in terms of negotiating contracts and the protection and licensing of intellectual property. Findings also show that the search for partners in the beginning of the project, the pacifier role of the TTO to help mutual understanding, and the active commercialisation of academic research to external partners happened only in the UK case, which may generate implications for TTOs in Brazil.

  14. Evaluation of regional project to strengthen national health research systems in four countries in West Africa: lessons learned.

    Science.gov (United States)

    Sombié, Issiaka; Aidam, Jude; Montorzi, Gabriela

    2017-07-12

    Since the Commission on Health Research for Development (COHRED) published its flagship report, more attention has been focused on strengthening national health research systems (NHRS). This paper evaluates the contribution of a regional project that used a participatory approach to strengthen NHRS in four post-conflict West African countries - Guinea-Bissau, Liberia, Sierra Leone and Mali. The data from the situation analysis conducted at the start of the project was compared to data from the project's final evaluation, using a hybrid conceptual framework built around four key areas identified through the analysis of existing frameworks. The four areas are governance and management, capacities, funding, and dissemination/use of research findings. The project helped improve the countries' governance and management mechanisms without strengthening the entire NHRS. In the four countries, at least one policy, plan or research agenda was developed. One country put in place a national health research ethics committee, while all four countries could adopt a research information management system. The participatory approach and support from the West African Health Organisation and COHRED were all determining factors. The lessons learned from this project show that the fragile context of these countries requires long-term engagement and that support from a regional institution is needed to address existing challenges and successfully strengthen the entire NHRS.

  15. Comparison of Outcomes between Early Fascial Closure and Delayed Abdominal Closure in Patients with Open Abdomen: A Systematic Review and Meta-Analysis

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2014-01-01

    Full Text Available Up to the present, the optimal time to close an open abdomen remains controversial. This study was designed to evaluate whether early fascial abdominal closure had advantages over delayed approach for open abdomen populations. Medline, Embase, and Cochrane Library were searched until April 2013. Search terms included “open abdomen,” “abdominal compartment syndrome,” “laparostomy,” “celiotomy,” “abdominal closure,” “primary,” “delayed,” “permanent,” “fascial closure,” and “definitive closure.” Open abdomen was defined as “fail to close abdominal fascia after a laparotomy.” Mortality, complications, and length of stay were compared between early and delayed fascial closure. In total, 3125 patients were included for final analysis, and 1942 (62% patients successfully achieved early fascial closure. Vacuum assisted fascial closure had no impact on pooled fascial closure rate. Compared with delayed abdominal closure, early fascial closure significantly reduced mortality (12.3% versus 24.8%, RR, 0.53, P<0.0001 and complication incidence (RR, 0.68, P<0.0001. The mean interval from open abdomen to definitive closure ranged from 2.2 to 14.6 days in early fascial closure groups, but from 32.5 to 300 days in delayed closure groups. This study confirmed clinical advantages of early fascial closure over delayed approach in treatment of patients with open abdomen.

  16. Safety and Mission Assurance for In-House Design Lessons Learned from Ares I Upper Stage

    Science.gov (United States)

    Anderson, Joel M.

    2011-01-01

    This viewgraph presentation identifies lessons learned in the course of the Ares I Upper Stage design and in-house development effort. The contents include: 1) Constellation Organization; 2) Upper Stage Organization; 3) Presentation Structure; 4) Lesson-Importance of Systems Engineering/Integration; 5) Lesson-Importance of Early S&MA Involvement; 6) Lesson-Importance of Appropriate Staffing Levels; 7) Lesson-Importance S&MA Team Deployment; 8) Lesson-Understanding of S&MA In-Line Engineering versus Assurance; 9) Lesson-Importance of Close Coordination between Supportability and Reliability/Maintainability; 10) Lesson-Importance of Engineering Data Systems; 11) Lesson-Importance of Early Development of Supporting Databases; 12) Lesson-Importance of Coordination with Safety Assessment/Review Panels; 13) Lesson-Implementation of Software Reliability; 14) Lesson-Implementation of S&MA Technical Authority/Chief S&MA Officer; 15) Lesson-Importance of S&MA Evaluation of Project Risks; 16) Lesson-Implementation of Critical Items List and Government Mandatory Inspections; 17) Lesson-Implementation of Critical Items List Mandatory Inspections; 18) Lesson-Implementation of Test Article Safety Analysis; and 19) Lesson-Importance of Procurement Quality.

  17. Refining MARGINS Mini-Lessons Using Classroom Observations

    Science.gov (United States)

    Iverson, E. A.; Manduca, C. A.; McDaris, J. R.; Lee, S.

    2009-12-01

    One of the challenges that we face in developing teaching materials or activities from research findings is testing the materials to determine that they work as intended. Traditionally faculty develop material for their own class, notice what worked and didn’t, and improve them the next year. However, as we move to a community process of creating and sharing teaching materials, a community-based process for testing materials is appropriate. The MARGINS project has piloted such a process for testing teaching materials and activities developed as part of its mini-lesson project (http://serc.carleton.edu/margins/index.html). Building on prior work developing mechanisms for community review of teaching resources (e.g. Kastens, 2002; Hancock and Manduca, 2005; Mayhew and Hall, 2007), the MARGINS evaluation team developed a structured classroom observation protocol. The goals of field testing are to a) gather structured, consistent feedback for the lesson authors based on classroom use; b) guide reviewers of these lessons to reflect on research-based educational practice as a framework for their comments; c) collect information on the data and observations that the reviewer used to underpin their review; d) determine which mini-lessons are ready to be made widely available on the website. The protocol guides faculty observations on why they used the activity, the effectiveness of the activity in their classroom, the success of the activity in leading to the desired learning, and what other faculty need to successfully use the activity. Available online (http://serc.carleton.edu/margins/protocol.html), the protocol can be downloaded and completed during instruction with the activity. In order to encourage review of mini-lessons using the protocol, a workshop focused on review and revision of activities was held in May 2009. In preparation for the workshop, 13 of the 28 participants chose to field test a mini-lesson prior to the workshop and reported that they found this

  18. 2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    C. T. Lindsey, A. L. Johnson

    2010-09-30

    This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

  19. Lessons learned from post-accident management at Chernobyl: the P.a.r.e.x. project

    International Nuclear Information System (INIS)

    Heriard Dubreuil, G.; Lochard, J.; Bataille, C.; Ollagnon, H.; Baude, St.

    2008-01-01

    Return of experience on Chernobyl post-accident management: the PAREX study Belarus is the country the most affected by the Chernobyl fallouts and is among the most significant experiences in the nuclear post-accident field. Despite specificities inherent to the political and social situation in Belarus, the experience of post-accidental management in this country holds a wealth of lessons in the perspective of preparation to a post-accidental situation in the French and European context. Through the PAREX project (2005-2006), the French Nuclear Safety Authority analysed the return of experience of Chernobyl post-accident management from 1986 to 2005 in order to draw its lessons in the perspective of a preparation policy. The study was led by a group of experts and involved the participation of a pluralistic group of about thirty participants (public authorities, local governments, NGOs, experts, operators). PAREX highlighted the complexity of a situation of long-lasting radioactive contamination (diversity of stakeholders and of dimensions at stake: health, environment, economy, society...). Beyond traditional public crisis management tools and frameworks, post-accident strategies also involves in the longer term a territorial and social response, which relies on local capacities of initiative. Preparation to such process requires experimenting new modes of operation that allow a diversity of local actors to take part to the response to a situation of contamination and to the surveillance system, with the support of public authorities. The conclusions of PAREX include a set of recommendations in this perspective. (authors)

  20. 50 CFR 648.161 - Closures.

    Science.gov (United States)

    2010-10-01

    ... Bluefish Fishery § 648.161 Closures. (a) EEZ closure. NMFS shall close the EEZ to fishing for bluefish by... dealer permit holders that no commercial quota is available for landing bluefish in that state. ...

  1. Lessons learned -- NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Flowers, L.

    1998-07-01

    In 1993, a workshop was convened at the National Renewable Energy Laboratory (NREL) to discuss the issues of applying renewable energy in a sustainable manner to international rural development. One of the summary recommendations was that NREL could assist in the renewable energy for rural electrification effort by developing and supplying six related activities: resource assessment, comparative analysis and modeling, performance monitoring and analysis, pilot project development, internet-based project data, communications, and training. In response to this recommendation, NREL launched its Village Power Program consisting of these activities that cut across NREL technologies and disciplines. Currently NREL is active in 20 countries, with pilot projects in 12 of those countries. At this time the technologies include photovoltaics, wind, biomass, and hybrids. The rural applications include home lighting and communications, water pumping, schools and health posts, battery charging stations, ecotourism, and village systems. These pilot projects are central to the renewable energy village power development through the demonstration of three aspects critical to replication and implementation of the projects on a significant scale. The three aspects are technical functionality, economic competitiveness, and institutional sustainability. It is important to note that the pilot projects from which NREL's experience has been gained were funded and, in many cases, developed by other organizations and agencies. NREL's role has been one of technical assistance or project management or both. The purpose of this paper is to describe the lessons NREL staff has gleaned from their participation in the various pilot projects. The author hopes that these lessons will help the Renewable Energy-Based Rural Electrification (RERE) community in implementing sustainable projects that lead to replication.

  2. Effects of multiple intelligences supported project-based learning on students’ achievement levels and attitudes towards English lesson

    Directory of Open Access Journals (Sweden)

    Gökhan Baş

    2007-07-01

    Full Text Available The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students’ achievement and their attitude towards English lesson. The research was carried out in 2009 – 2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary School, Nigde, Turkey. Totally 50 students in two different classes in the 5th grade of this school participated in the study. The results of the research showed a significant difference between the attitude scores of the experiment group and the control group. It was also found out that the multiple intelligences approach activities were more effective in the positive development of the students’ attitudes. At the end of the research, it is revealed that the students who are educated by multiple intelligences supported project-based learning method are more successful and have a higher motivation level than the students who are educated by the traditional instructional methods.

  3. Effects of multiple intelligences supported project-based learning on students’ achievement levels and attitudes towards English lesson

    Directory of Open Access Journals (Sweden)

    Gökhan BAŞ

    2010-07-01

    Full Text Available The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students' achievement and their attitude towards English lesson. The research was carried out in 2009 – 2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary School, Nigde, Turkey. Totally 50 students in two different classes in the 5th grade of this school participated in the study. The results of the research showed a significant difference between the attitude scores of the experiment group and the control group. It was also found out that the multiple intelligences approach activities were more effective in thepositive development of the students’ attitudes. At the end of the research, it is revealed that the students who are educated by multiple intelligences supported project-based learning method are more successful and have a higher motivation level than the studentswho are educated by the traditional instructional methods.

  4. Comparison of fasciotomy wound closures using traditional dressing changes and the vacuum-assisted closure device.

    Science.gov (United States)

    Zannis, John; Angobaldo, Jeff; Marks, Malcolm; DeFranzo, Anthony; David, Lisa; Molnar, Joseph; Argenta, Louis

    2009-04-01

    Fasciotomy wounds can be a major contributor to length of stay for patients as well as a difficult reconstructive challenge. Once the compartment pressure has been relieved and stabilized, the wound should be closed as quickly and early as possible to avoid later complications. Skin grafting can lead to morbidity and scarring at both the donor and fasciotomy site. Primary closure results in a more functional and esthetic outcome with less morbidity for the patient, but can often be difficult to achieve secondary to edema, skin retraction, and skin edge necrosis. Our objective was to examine fasciotomy wound outcomes, including time to definitive closure, comparing traditional wet-to-dry dressings, and the vacuum-assisted closure (VAC) device. This retrospective chart review included a consecutive series of patients over a 10-year period. This series included 458 patients who underwent 804 fasciotomies. Of these fasciotomy wounds, 438 received exclusively VAC. dressings, 270 received only normal saline wet-to-dry dressings, and 96 were treated with a combination of both. Of the sample, 408 patients were treated with exclusively VAC therapy or wet-to-dry dressings and 50 patients were treated with a combination of both. In comparing all wounds, there was a statistically significant higher rate of primary closure using the VAC versus traditional wet-to-dry dressings (P lower extremities and P extremities). The time to primary closure of wounds was shorter in the VAC. group in comparison with the non-VAC group. This study has shown that the use of the VAC for fasciotomy wound closure results in a higher rate of primary closure versus traditional wet-to-dry dressings. In addition, the time to primary closure of wounds or time to skin grafting is shorter when the VAC was employed. The VAC used in the described settings decreases hospitalization time, allows for earlier rehabilitation, and ultimately leads to increased patient satisfaction.

  5. ISS Solar Array Alpha Rotary Joint (SARJ) Bearing Failure and Recovery: Technical and Project Management Lessons Learned

    Science.gov (United States)

    DellaCorte, Christopher; Krantz, Timothy L.; Dube, Michael J.

    2011-01-01

    The photovoltaic solar panels on the International Space Station (ISS) track the Sun through continuous rotating motion enabled by large bearings on the main truss called solar array alpha rotary joints (SARJs). In late 2007, shortly after installation, the starboard SARJ had become hard to turn and had to be shut down after exceeding drive current safety limits. The port SARJ, of the same design, had been working well for over 2 years. An exhaustive failure investigation ensued that included multiple extravehicular activities to collect information and samples for engineering forensics, detailed structural and thermal analyses, and a careful review of the build records. The ultimate root cause was determined to be kinematic design vulnerability coupled with inadequate lubrication, and manufacturing flaws; this was corroborated through ground tests, metallurgical studies, and modeling. A highly successful recovery plan was developed and implemented that included replacing worn and damaged components in orbit and applying space-compatible grease to improve lubrication. Beyond the technical aspects, however, lie several key programmatic lessons learned. These lessons, such as running ground tests to intentional failure to experimentally verify failure modes, are reviewed and discussed so they can be applied to future projects to avoid such problems.

  6. Surviving the Lead Reliability Engineer Role in High Unit Value Projects

    Science.gov (United States)

    Perez, Reinaldo J.

    2011-01-01

    A project with a very high unit value within a company is defined as a project where a) the project constitutes one of a kind (or two-of-a-kind) national asset type of project, b) very large cost, and c) a mission failure would be a very public event that will hurt the company's image. The Lead Reliability engineer in a high visibility project is by default involved in all phases of the project, from conceptual design to manufacture and testing. This paper explores a series of lessons learned, over a period of ten years of practical industrial experience by a Lead Reliability Engineer. We expand on the concepts outlined by these lessons learned via examples. The lessons learned are applicable to all industries.

  7. Closure of a unique mixed waste storage canal at the Dept. of Energy's Oak Ridge National Laboratory (ORNL)

    International Nuclear Information System (INIS)

    Greer, J.K. Jr.; Etheridge, J.T.; Thompson, W.T.

    1994-01-01

    At the Department of Energy's (DOE's) Oak Ridge National Laboratory (ORNL) a unique closure was accomplished for a storage canal that contained both hazardous chemical contaminants controlled by the Resource Conservation and Recovery Act (RCRA), and radioactive contaminants controlled by the Atomic Energy Act (AEA). During 1991 and 1992, after approvals were received from the DOE and the Tennessee Department of Environment and Conservation (TDEC), subcontractors to DOE's Construction Manager were mobilized and remote controlled equipment was operated on site to remove the RCRA and radioactive contamination (referred to hereafter as mixed wastes) from the 3001 Storage Canal at ORNL. After numerous open-quotes surprisesclose quotes during the removal activities, each requiring problem resolution and approvals from DOE and TDEC, the canal closure was completed in September 1992 and final closure certification was submitted to TDEC in October 1992. The following discussion describes the learning experiences that ORNL and DOE acquired from a RCRA closure project for a mixed waste storage canal containing high radiation levels. The project was successful, especially since worker exposures were minimized, but was lengthy, requiring 30 months from notification of a leak in the canal until final demobilization of the subcontractor, and expensive to complete (total overall cost of $3 million)

  8. Hanford Patrol Academy Demolition Sites Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    From 1975 to 1991 the Hanford Patrol Academy Demolition Sites (HPADS) were used for demolition events. These demolition events were a form of thermal treatment for spent or abandoned chemical waste. Because the HPADS will no longer be used for this thermal activity, the sites will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and 40 CFR 270.1. Closure also will satisfy closure requirements of WAC 173-303-680 and for the thermal treatment closure requirements of 40 CFR 265.381. This closure plan presents a description of the HPADS, the history of the waste treated, and the approach that will be followed to close the HPADS. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. Only dangerous constituents derived from HPADS operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i). The HPADS are actually two distinct soil closure areas within the Hanford Patrol Academy training area

  9. Corporate strategy and viable future land use: Planning for closure from the outset of mining

    International Nuclear Information System (INIS)

    Warhurst, A.

    2000-01-01

    This paper provides an overview of the environmental impact of mining on viable future land use and underlines the imperative of improved environmental management and closure planning. It argues that pollution prevention, through planning for closure, can lead to cost-effective strategies for sustainable minerals development and viable future land use. This seems to be most true for greenfield sites since, generally, the earlier closure planning and pollution prevention is built into a project, the more cost-effective and environmentally benign closure will be. Further, for greenfield sites, pollution prevention techniques can be employed from the outset, at the stages of exploration and mine development, and then monitored and improved through the operation stage to closure, and can be kept in place to manage future land use. The paper discusses how global changes in the industry, following the liberalisation of investment regimes, and mergers and strategic alliances between key firms, has, by virtue of the diffusion of new technology, led to further opportunities to prevent pollution and optimise future land use through planning for closure from the outset. The objectives and components of closure plans are also reviewed as the paper draws on case studies to highlight some of the possible constraints and challenges to pollution prevention that may be faced at the level of both public policy and corporate strategy. The article concludes by suggesting a forward-looking approach to integrated environmental management and viable future land-use planning based on a dynamic model for environmental management. (author)

  10. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  11. Lessons learned from early criticality accidents

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1996-01-01

    Four accidents involving the approach to criticality occurred during the period July, 1945, through May, 1996. These have been described in the format of the OPERATING EXPERIENCE WEEKLY SUMMARY which is distributed by the Office of Nuclear and Facility Safety. Although the lessons learned have been incorporated in standards, codes, and formal procedures during the last fifty years, this is their first presentation in this format. It is particularly appropriate that they be presented in the forum of the Nuclear Criticality Technology Safety Project Workshop closest to the fiftieth anniversary of the last of the four accidents, and that which was most instrumental in demonstrating the need to incorporate lessons learned

  12. ASD Closure in Structural Heart Disease.

    Science.gov (United States)

    Wiktor, Dominik M; Carroll, John D

    2018-04-17

    While the safety and efficacy of percutaneous ASD closure has been established, new data have recently emerged regarding the negative impact of residual iatrogenic ASD (iASD) following left heart structural interventions. Additionally, new devices with potential advantages have recently been studied. We will review here the potential indications for closure of iASD along with new generation closure devices and potential late complications requiring long-term follow-up. With the expansion of left-heart structural interventions and large-bore transseptal access, there has been growing experience gained with management of residual iASD. Some recently published reports have implicated residual iASD after these procedures as a potential source of diminished clinical outcomes and mortality. Additionally, recent trials investigating new generation closure devices as well as expanding knowledge regarding late complications of percutaneous ASD closure have been published. While percutaneous ASD closure is no longer a novel approach to managing septal defects, there are several contemporary issues related to residual iASD following large-bore transseptal access and new generation devices which serve as an impetus for this review. Ongoing attention to potential late complications and decreasing their incidence with ongoing study is clearly needed.

  13. 32 CFR 989.25 - Base closure and realignment.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Base closure and realignment. 989.25 Section 989... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.25 Base closure and realignment. Base closure or realignment may entail special requirements for environmental analysis. The permanent base closure...

  14. Research Data Curation Pilots: Lessons Learned

    Directory of Open Access Journals (Sweden)

    David Minor

    2014-07-01

    Full Text Available In the spring of 2011, the UC San Diego Research Cyberinfrastructure (RCI Implementation Team invited researchers and research teams to participate in a research curation and data management pilot program. This invitation took the form of a campus-wide solicitation. More than two dozen applications were received and, after due deliberation, the RCI Oversight Committee selected five curation-intensive projects. These projects were chosen based on a number of criteria, including how they represented campus research, varieties of topics, researcher engagement, and the various services required. The pilot process began in September 2011, and will be completed in early 2014. Extensive lessons learned from the pilots are being compiled and are being used in the on-going design and implementation of the permanent Research Data Curation Program in the UC San Diego Library. In this paper, we present specific implementation details of these various services, as well as lessons learned. The program focused on many aspects of contemporary scholarship, including data creation and storage, description and metadata creation, citation and publication, and long term preservation and access. Based on the lessons learned in our processes, the Research Data Curation Program will provide a suite of services from which campus users can pick and choose, as necessary. The program will provide support for the data management requirements from national funding agencies.

  15. Understanding public sexual harassment : lesson plans and session guidance, key Stages 3 & 4.

    OpenAIRE

    Vera-Gray, F.; Bullough, J.

    2017-01-01

    These lesson plans have been written by Dr. Fiona Vera-Gray at Durham University and Jayne Bullough from Rape Crisis South London (RASASC). They were created through a partnership project with Doll’s Eye Theatre, Purple Drum, RASASC, Dr. Maria Garner, and Dr. Fiona Vera-Gray. Lessons on public sexual harassment were drawn from the work of Dr. Vera-Gray at Durham University. The project was made possible by Durham Law School’s Impact Acceleration Grant from the Economics and ...

  16. ICPP calcined solids storage facility closure study. Volume III: Engineering design files

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The following information was calculated to support cost estimates and radiation exposure calculations for closure activities at the Calcined Solids Storage Facility (CSSF). Within the estimate, volumes were calculated to determine the required amount of grout to be used during closure activities. The remaining calcine on the bin walls, supports, piping, and floor was also calculated to approximate the remaining residual calcine volumes at different stages of the removal process. The estimates for remaining calcine and vault void volume are higher than what would actually be experienced in the field, but are necessary for bounding purposes. The residual calcine in the bins may be higher than was is experienced in the field as it was assumed that the entire bin volume is full of calcine before removal activities commence. The vault void volumes are higher as the vault roof beam volumes were neglected. The estimations that follow should be considered rough order of magnitude, due to the time constraints as dictated by the project`s scope of work. Should more accurate numbers be required, a new analysis would be necessary.

  17. Patent ductus arteriosus closure using an Amplatzer™ ventricular septal defect closure device

    Science.gov (United States)

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the definitive therapy because the patency of ductus arteriosus may lead to multiple complications, depending on the size and flow through the ductus. PDA closure is indicated in patients with symptoms and evidence of left heart enlargement, and in patients with elevated pulmonary pressures when reversal is possible. Transcatheter closure is the preferred technique in adults because it avoids sternotomy, reduces the length of hospital stay and is associated with fewer complications compared with surgery. First demonstrated in 1967, both the technique and the occluder devices used have since evolved. However, designing an ideal PDA occluder has been a challenge due to the variability in size, shape and orientation of PDAs. The present article describes a case involving a 35-year-old woman who presented to the Center for Advanced Heart Failure (Houston, USA) with congestive heart failure due to a large PDA, which was successfully occluded using an Amplatzer (St Jude Medical, USA) muscular ventricular septal defect closure device. The wider waist and dual-retention discs of these ventricular septal defect closure devices may be important factors to consider in the future development of devices for the occlusion of large PDAs. PMID:24294051

  18. Evaluation of the Momentum Closure Schemes in MPAS-Ocean

    Science.gov (United States)

    Zhao, Shimei; Liu, Yudi; Liu, Wei

    2018-04-01

    In order to compare and evaluate the performances of the Laplacian viscosity closure, the biharmonic viscosity closure, and the Leith closure momentum schemes in the MPAS-Ocean model, a variety of physical quantities, such as the relative reference potential energy (RPE) change, the RPE time change rate (RPETCR), the grid Reynolds number, the root mean square (RMS) of kinetic energy, and the spectra of kinetic energy and enstrophy, are calculated on the basis of results of a 3D baroclinic periodic channel. Results indicate that: 1) The RPETCR demonstrates a saturation phenomenon in baroclinic eddy tests. The critical grid Reynolds number corresponding to RPETCR saturation differs between the three closures: the largest value is in the biharmonic viscosity closure, followed by that in the Laplacian viscosity closure, and that in the Leith closure is the smallest. 2) All three closures can effectively suppress spurious dianeutral mixing by reducing the grid Reynolds number under sub-saturation conditions of the RPETCR, but they can also damage certain physical processes. Generally, the damage to the rotation process is greater than that to the advection process. 3) The dissipation in the biharmonic viscosity closure is strongly dependent on scales. Most dissipation concentrates on small scales, and the energy of small-scale eddies is often transferred to large-scale kinetic energy. The viscous dissipation in the Laplacian viscosity closure is the strongest on various scales, followed by that in the Leith closure. Note that part of the small-scale kinetic energy is also transferred to large-scale kinetic energy in the Leith closure. 4) The characteristic length scale L and the dimensionless parameter D in the Leith closure are inherently coupled. The RPETCR is inversely proportional to the product of D and L. When the product of D and L is constant, both the simulated RPETCR and the inhibition of spurious dianeutral mixing are the same in all tests using the Leith

  19. National Workplace Literacy Program. Garment-Related Bilingual (English and Chinese) Broadcast Lessons. Book 1 and 2.

    Science.gov (United States)

    Chan, Ha Yin

    A compilation of transcripts of 100 bilingual English/Chinese broadcast lessons for workers in the garment industry is presented. The lessons are part of the New York Chinatown Manpower Project's Workplace Literacy Program. With the support of the Sino Radio Broadcast Corporation, the lessons are broadcast daily in the morning and again after the…

  20. Energy efficiency and renewable energies: first lessons learned from AFD and FFEM funding

    International Nuclear Information System (INIS)

    Ries, Alain; Dubus, Koulm; Naudet, Jean David

    2008-04-01

    The French Agency for Development (AFD) has been always more involved in projects dealing with issues related to global warming, and more particularly in projects aiming at developing energy efficiency and renewable energies, these projects involved different expertises (energy, urban planning, transports, agriculture, and so on). In order to highlight lessons learned from these diversity of projects and interventions, this report first proposes an analysis of these projects related to energy efficiency and renewable energies in terms of concerned sectors, of intervener, of funding type, and of evolution in time. Then, the authors highlight lessons learned in terms of project starting conditions (national framework, funding, technical abilities, social and environmental factors), in terms of funding conditions for these projects (concessional financing, specialised credit lines), and in terms of climatic impact assessment and of criteria of project selection (practices and reductions of greenhouse gas emissions, improvement of the climatic impact for project financed by the AFD)

  1. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-10-23

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  2. A Summary of the Rendezvous, Proximity Operations, Docking, and Undocking (RPODU) Lessons Learned from the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) Demonstration System Mission

    Science.gov (United States)

    Dennehy, Cornelius J.; Carpenter, James R.

    2011-01-01

    The Guidance, Navigation, and Control (GN&C) Technical Discipline Team (TDT) sponsored Dr. J. Russell Carpenter, a Navigation and Rendezvous Subject Matter Expert (SME) from NASA's Goddard Space Flight Center (GSFC), to provide support to the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) rendezvous and docking flight test that was conducted in 2007. When that DARPA OE mission was completed, Mr. Neil Dennehy, NASA Technical Fellow for GN&C, requested Dr. Carpenter document his findings (lessons learned) and recommendations for future rendezvous missions resulting from his OE support experience. This report captures lessons specifically from anomalies that occurred during one of OE's unmated operations.

  3. When do Armed Revolts Succeed: Lessons from Lanchester Theory

    Science.gov (United States)

    2011-10-01

    When do Armed Revolts Succeed: Lessons from Lanchester Theory Michael P. Atkinson 1, Alexander Gutfraind 2, Moshe Kress 1 Abstract Major revolts have...classic Lanchester theory of combat. The model accounts for the split in the population between those loyal to the regime and those favoring the...Lessons from Lanchester Theory 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f

  4. TRANSITION & CLOSEOUT OF THE FERNALD CLOSURE PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    BILSON, H.E.

    2007-02-01

    The US Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program.

  5. TECHNICAL PEER REVIEW REPORT - YUCCA MOUNTAIN: WASTE PACKAGE CLOSURE CONTROL SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    NA

    2005-10-25

    The objective of the Waste Package Closure System (WPCS) project is to assist in the disposal of spent nuclear fuel (SNF) and associated high-level wastes (HLW) at the Yucca Mountain site in Nevada. Materials will be transferred from the casks into a waste package (WP), sealed, and placed into the underground facility. The SNF/HLW transfer and closure operations will be performed in an aboveground facility. The objective of the Control System is to bring together major components of the entire WPCS ensuring that unit operations correctly receive, and respond to, commands and requests for data. Integrated control systems will be provided to ensure that all operations can be performed remotely. Maintenance on equipment may be done using hands-on or remote methods, depending on complexity, exposure, and ease of access. Operating parameters and nondestructive examination results will be collected and stored as permanent electronic records. Minor weld repairs must be performed within the closure cell if the welds do not meet the inspection acceptance requirements. Any WP with extensive weld defects that require lids to be removed will be moved to the remediation facility for repair.

  6. TECHNICAL PEER REVIEW REPORT - YUCCA MOUNTAIN: WASTE PACKAGE CLOSURE CONTROL SYSTEM

    International Nuclear Information System (INIS)

    2005-01-01

    The objective of the Waste Package Closure System (WPCS) project is to assist in the disposal of spent nuclear fuel (SNF) and associated high-level wastes (HLW) at the Yucca Mountain site in Nevada. Materials will be transferred from the casks into a waste package (WP), sealed, and placed into the underground facility. The SNF/HLW transfer and closure operations will be performed in an aboveground facility. The objective of the Control System is to bring together major components of the entire WPCS ensuring that unit operations correctly receive, and respond to, commands and requests for data. Integrated control systems will be provided to ensure that all operations can be performed remotely. Maintenance on equipment may be done using hands-on or remote methods, depending on complexity, exposure, and ease of access. Operating parameters and nondestructive examination results will be collected and stored as permanent electronic records. Minor weld repairs must be performed within the closure cell if the welds do not meet the inspection acceptance requirements. Any WP with extensive weld defects that require lids to be removed will be moved to the remediation facility for repair

  7. Phacoemulsification with intraocular lens implantation in primary angle-closure suspect, primary angle-closure and primary angle-closure glaucoma with cataract

    Directory of Open Access Journals (Sweden)

    Kun Zeng

    2013-08-01

    Full Text Available AIM: To evaluate the features and clinical outcomes of cataract extraction by phacoemulsification with intraocular lens implantation in primary angle-closure suspect(PACS, primary angle-closure(PACand primary angle-closure glaucoma(PACGwith cataract.METHODS:Phacoemulsification with intraocular lens implantation was performed on 86 cases(86 eyesdiagnosed as PACS, PAC and PACG co-existing cataract from January to December 2012. All cases were followed up for 3 months to 1 year. Pre-operative and post-operative visual acuity, intraocular pressure(IOP, gonioscopy, ultrasound biomicroscopy(UBM, visual field and usage of anti-glaucomaous eye drops were recorded.RESULTS:Zonular dialysis existed in 19 eyes(22%. The post-operative visual acuity improved in 84 eyes(98%. The post-operative visual acuity was CONCLUSION: PACS, PAC and PACG co-existing zonular dialysis is common. Phacoemulsification with IOL implantation can reduce IOP, deepen anterior chamber and open angle.

  8. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    Science.gov (United States)

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  9. 40 CFR 264.178 - Closure.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Use and Management of Containers § 264.178 Closure. At closure, all hazardous waste and hazardous waste residues must be removed...

  10. Closure report for N Reactor

    International Nuclear Information System (INIS)

    1994-01-01

    This report has been prepared to satisfy Section 3156(b) of Public Law 101-189 (Reports in Connection with Permanent Closures of Department of Energy Defense Nuclear Facilities), which requires submittal of a Closure Report to Congress by the Secretary of Energy upon the permanent cessation of production operations at a US Department of Energy (DOE) defense nuclear facility (Watkins 1991). This closure report provides: (1) A complete survey of the environmental problems at the facility; (2) Budget quality data indicating the cost of environmental restoration and other remediation and cleanup efforts at the facility; (3) A proposed cleanup schedule

  11. Closure report for N Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This report has been prepared to satisfy Section 3156(b) of Public Law 101-189 (Reports in Connection with Permanent Closures of Department of Energy Defense Nuclear Facilities), which requires submittal of a Closure Report to Congress by the Secretary of Energy upon the permanent cessation of production operations at a US Department of Energy (DOE) defense nuclear facility (Watkins 1991). This closure report provides: (1) A complete survey of the environmental problems at the facility; (2) Budget quality data indicating the cost of environmental restoration and other remediation and cleanup efforts at the facility; (3) A proposed cleanup schedule.

  12. Lessons learned in terms of crisis management

    International Nuclear Information System (INIS)

    2006-01-01

    This document outlines that nobody was prepared to the crisis which occurred after the Chernobyl accident, whether in Russia, Europe or France. In order to illustrate the fact that crisis management has been different from one country to another, the report describes how the crisis has been managed in Norway (which has been quickly reached by fallouts and with a rather high level) and in Switzerland. It comments radioactivity measurements performed in France during spring 1986 by the SCPRI, the CEA and the ISPN. It discusses the lessons drawn in France in terms of emergency situation management regarding the protection of the population, crisis management, and the French post-accidental doctrine. It comments the lessons drawn in eastern European countries, with the cooperative implication of the IRSN. International projects are evoked: the Chernobyl Centre, the French-German Initiative, the European projects (EURANOS, NERIS, FARMING, STRATEGY, MOSES and SAMEN)

  13. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  14. Clinical software development for the Web: lessons learned from the BOADICEA project.

    Science.gov (United States)

    Cunningham, Alex P; Antoniou, Antonis C; Easton, Douglas F

    2012-04-10

    In the past 20 years, society has witnessed the following landmark scientific advances: (i) the sequencing of the human genome, (ii) the distribution of software by the open source movement, and (iii) the invention of the World Wide Web. Together, these advances have provided a new impetus for clinical software development: developers now translate the products of human genomic research into clinical software tools; they use open-source programs to build them; and they use the Web to deliver them. Whilst this open-source component-based approach has undoubtedly made clinical software development easier, clinical software projects are still hampered by problems that traditionally accompany the software process. This study describes the development of the BOADICEA Web Application, a computer program used by clinical geneticists to assess risks to patients with a family history of breast and ovarian cancer. The key challenge of the BOADICEA Web Application project was to deliver a program that was safe, secure and easy for healthcare professionals to use. We focus on the software process, problems faced, and lessons learned. Our key objectives are: (i) to highlight key clinical software development issues; (ii) to demonstrate how software engineering tools and techniques can facilitate clinical software development for the benefit of individuals who lack software engineering expertise; and (iii) to provide a clinical software development case report that can be used as a basis for discussion at the start of future projects. We developed the BOADICEA Web Application using an evolutionary software process. Our approach to Web implementation was conservative and we used conventional software engineering tools and techniques. The principal software development activities were: requirements, design, implementation, testing, documentation and maintenance. The BOADICEA Web Application has now been widely adopted by clinical geneticists and researchers. BOADICEA Web

  15. Lessons learned from positron-electron project low level rf and longitudinal feedback

    Directory of Open Access Journals (Sweden)

    J. Fox

    2010-05-01

    Full Text Available The Positron-Electron Project II (PEP-II B Factory collider ended the final phase of operation at nearly twice the design current and 4X the design luminosity. In the ultimate operation state, eight 1.2 MW radio-frequency (rf klystrons and 12 accelerating cavities were added beyond the original implementation, and the two storage rings were operating with longitudinal instability growth rates roughly 5X in excess of the original design estimates. From initial commissioning there has been continual adaptation of the low level rf (LLRF control strategies, configuration tools, and some new hardware in response to unanticipated technical challenges. This paper offers a perspective on the original LLRF and longitudinal instability control design, and highlights via two examples the system evolution from the original design estimates through to the final machine with 1.2×10^{34} luminosity. The impact of unanticipated signals in the coupled-bunch longitudinal feedback and the significance of nonlinear processing elements in the LLRF systems are presented. We present valuable “lessons learned” which are of interest to designers of next generation feedback and impedance controlled LLRF systems.

  16. 9 CFR 318.301 - Containers and closures.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Containers and closures. 318.301... Canning and Canned Products § 318.301 Containers and closures. (a) Examination and cleaning of empty containers. (1) Empty containers, closures, and flexible pouch roll stock shall be evaluated by the...

  17. 75 FR 29322 - Base Closure and Realignment

    Science.gov (United States)

    2010-05-25

    ... DEPARTMENT OF DEFENSE Office of the Secretary Base Closure and Realignment AGENCY: Office of...)(ii) of the Defense Base Closure and Realignment Act of 1990. It provides a partial list of military installations closing or realigning pursuant to the 2005 Base Closure and Realignment (BRAC) Report. It also...

  18. Lessons learned at Lower East Fork Poplar Creek, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burch, K.L.; Page, D.G.

    1996-01-01

    The US Department of Energy (DOE) used several innovative strategies and technologies in conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) activities for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. These innovations helped to cost-effectively characterize the 270-ha (670-acre), 23.3-km (14.5-mile) floodplain and to obtain a 400-parts per million (ppm) cleanup level for mercury in soil. Lessons learned during the project involve management, investigation, and risk assessment strategies and techniques. Management lessons learned include (a) how to handle the large OU, (b) how to effectively involve the community in decisions, and (c) how to select a remedy that incorporates the needs of many involved agencies. Investigation lessons learned include (a) how to design an effective sampling strategy for the site, (b) how to cost-effectively analyze a large number of samples, and (c) which of several treatment technologies is best-suited to the site. Risk assessment lessons learned include (a) how to determine an appropriate cleanup level for human health and the environment, (b) how to quantify uncertainty in the human health risk assessment, (c) how to reconcile different solubilities of different mercury species, and (d) how to best conduct the ecological risk assessment. Other CERCLA sites can benefit from lessons learned during this project whether still in the investigative stage or further along in the process. Applying these lessons can substantially reduce costs and make more efficient use of Superfund resources

  19. Project communication management in complex environments

    CERN Document Server

    Ying, Zhong

    2014-01-01

    This unique book that deals with project communication management in complex environments, taking a leaf from China’s experience with a major earthquake in Sichuan, would be a timely contribution to fill this lacuna. Readers would be able to understand how companies and organizations that are unprepared for crisis management would react to their detriment. The lessons provided in this book are the only one of its kind to highlight the lessons for companies and organizations to prepare themselves for successful project communication management through the complexity-informed framework. Although the book is written by two building professionals, the concepts and lessons presented are generic and equally applicable for businesses outside of the construction industry; for example, for airports, resorts, hotels, shipyards, etc.

  20. Through Their Eyes: Lessons Learned Using Participatory Methods in Health Care Quality Improvement Projects.

    Science.gov (United States)

    Balbale, Salva N; Locatelli, Sara M; LaVela, Sherri L

    2016-08-01

    In this methodological article, we examine participatory methods in depth to demonstrate how these methods can be adopted for quality improvement (QI) projects in health care. We draw on existing literature and our QI initiatives in the Department of Veterans Affairs to discuss the application of photovoice and guided tours in QI efforts. We highlight lessons learned and several benefits of using participatory methods in this area. Using participatory methods, evaluators can engage patients, providers, and other stakeholders as partners to enhance care. Participant involvement helps yield actionable data that can be translated into improved care practices. Use of these methods also helps generate key insights to inform improvements that truly resonate with stakeholders. Using participatory methods is a valuable strategy to harness participant engagement and drive improvements that address individual needs. In applying these innovative methodologies, evaluators can transcend traditional approaches to uniquely support evaluations and improvements in health care. © The Author(s) 2015.

  1. 2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    West, W. J.; Lucas, J. G.; Gano, K. A.

    2011-11-14

    This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

  2. Technical realization of a closure concept for a chamber-system in the underground Richard repository in the Czech Republic

    International Nuclear Information System (INIS)

    Kucerka, Miroslav

    2006-01-01

    The Phare project CZ 632.02.04 'Realization of closure of a chamber in the Richard repository as input for establishing a safety case' is a follow up implementation phase of the Phare project, CZ 01.14.03 'Solution for closure of a chamber in the Richard repository'. Main objective of both projects is to propose and realize a disposal system in selected chambers of the Richard repository, which will eliminate burden from the past practices in waste management during the first phase of the Richard repository operation (1965 - 1980) and which will improve its overall long term safety. This objective will be assured by realization of the concept of so called 'hydraulic cage', which technical solution was developed by DBE Technology within the Phare project CZ 01.14.03. The solution is described in the previous presentation 'Hydraulic Cage Concept for Waste Chambers and its Technical Implementation for the Underground Richard Repository, Litomerice, Czech Republic'. (author)

  3. Isolating Numerical Error Effects in LES Using DNS-Derived Sub-Grid Closures

    Science.gov (United States)

    Edoh, Ayaboe; Karagozian, Ann

    2017-11-01

    The prospect of employing an explicitly-defined filter in Large-Eddy Simulations (LES) provides the opportunity to reduce the interaction of numerical/modeling errors and offers the chance to carry out grid-converged assessments, important for model development. By utilizing a quasi a priori evaluation method - wherein the LES is assisted by closures derived from a fully-resolved computation - it then becomes possible to understand the combined impacts of filter construction (e.g., filter width, spectral sharpness) and discretization choice on the solution accuracy. The present work looks at calculations of the compressible LES Navier-Stokes system and considers discrete filtering formulations in conjunction with high-order finite differencing schemes. Accuracy of the overall method construction is compared to a consistently-filtered exact solution, and lessons are extended to a posteriori (i.e., non-assisted) evaluations. Supported by ERC, Inc. (PS150006) and AFOSR (Dr. Chiping Li).

  4. Closure Welding of Plutonium Bearing Storage Containers

    International Nuclear Information System (INIS)

    Cannell, G.R.

    2002-01-01

    A key element in the Department of Energy (DOE) strategy for the stabilization, packaging and storage of plutonium-bearing materials involves closure welding of DOE-STD-3013 Outer Containers (3013 container). The 3013 container provides the primary barrier and pressure boundary preventing release of plutonium-bearing materials to the environment. The final closure (closure weld) of the 3013 container must be leaktight, structurally sound and meet DOE STD 3013 specified criteria. This paper focuses on the development, qualification and demonstration of the welding process for the closure welding of Hanford PFP 3013 outer containers

  5. Lessons learned from solar energy projects in Saudi Arabia

    International Nuclear Information System (INIS)

    Huraib, F.S.; Hasnain, S.M.; Alawaji, S.H.

    1996-01-01

    This paper describes the lessons learned from the major RD and D activities at Energy Research Institute (ERI), King Abdulaziz City for Science and Technology (KACST) in the field of solar energy. Photovoltaic, solar thermal dishes, solar water heating, solar water pumping and desalination, solar hydrogen production and utilization are some of the areas studied for solar energy applications. Recommendations and guidelines for future solar energy research, development, demonstration and dissemination in Saudi Arabia are also given. (Author)

  6. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-30

    Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.

  7. Rock slopes and reservoirs - lessons learned

    International Nuclear Information System (INIS)

    Moore, D.P.

    1999-01-01

    Lessons learned about slope stability in the course of four decades of monitoring, and in some cases stabilizing, slopes along British Columbia's hydroelectric reservoirs are discussed. The lessons are illustrated by short case histories of some of the more important slopes such as Little Chief Slide, Dutchman's Ridge, Downie Slide, Checkerboard Creek and Wahleach. Information derived from the monitoring and other investigations are compared with early interpretations of geology and slope performance. The comparison serves as an indicator of progress in slope stability determination and as a measure of the value of accumulated experience in terms of the potential consequences to safety and cost savings over the long life-span of hydroelectric projects.14 refs., 2 tabs., 15 figs

  8. Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

    Energy Technology Data Exchange (ETDEWEB)

    Gano, K. A.; Lucas, J. G.; Lindsey, C. T.

    2011-06-30

    This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N, and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.

  9. Fuel channel closure and adapter

    International Nuclear Information System (INIS)

    Cashen, W.S.

    1985-01-01

    This invention provides a mechanical closure/actuating ram combination particularly suited for use in sealing the ends of the pressure tubes when a CANDU-type reactor is refueled. It provides a cluster that may be inserted into a fuel channel end fitting to provide at least partial closing off of a pressure tube while permitting the disengagement of the fueling machine and its withdrawal from the closure for other purposes. The invention also provides a ram/closure combination wherein the application of loading force to a deformable sealing disk is regulated by a massive load bar component forming part of the fueling machine and being therefore accessible for maintenance or replacement

  10. Pointing the Way to the Future of Project Management: How the Past and Present Point Towards Project Management's Future

    National Research Council Canada - National Science Library

    Ballister, Robert

    2003-01-01

    .... The lessons learned from those projects, coupled with a look at project management history in general, will be checked against a current project management theory to determine if the focus of today's...

  11. Quick-Reaction Report on the Audit of Defense Base Realignment and Closure Budget Data for Naval Training Center Great Lakes, Illinois

    Science.gov (United States)

    1994-05-19

    the audit of project P-608T, Building Modifications, as they relate to project P-557S. Because...project P-608T was addressed in Report No. 94-108, Quick-Reaction Report on the Audit of Defense Base Realignment and Closure Budget Data for Naval Station Treasure Island, California, May 19,

  12. Deep geologic disposal. Lessons learnt from recent performance assessment studies

    International Nuclear Information System (INIS)

    Pescatore, C.; Andersson, J.

    1998-01-01

    Performance assessment (PA) studies are part of the decision basis for the siting, operation, and closure of deep repositories of long-lived nuclear wastes. In 1995 the NEA set up the Working Group on Integrated Performance Assessments of Deep Repositories (IPAG) with the goals to analyse existing PA studies, learn about what has been produced to date, and shed light on what could be done in future studies. Ten organisations submitted their most recent PA study for analysis and discussion, including written answers to over 70 questions. Waste management programmes, disposal concepts, geologies, and different types and amounts of waste offered a unique opportunity for exchanging information, assessing progress in PA since 1990, and identifying recent trends. A report was completed whose main lessons are overviewed. (author)

  13. Restaurant closures

    CERN Document Server

    Novae Restauration

    2012-01-01

    Christmas Restaurant closures Please note that the Restaurant 1 and Restaurant 3 will be closed from Friday, 21 December at 5 p.m. to Sunday, 6 January, inclusive. They will reopen on Monday, 7 January 2013.   Restaurant 2 closure for renovation To meet greater demand and to modernize its infrastructure, Restaurant 2 will be closed from Monday, 17 December. On Monday, 14 January 2013, Sophie Vuetaz’s team will welcome you to a renovated self-service area on the 1st floor. The selections on the ground floor will also be expanded to include pasta and pizza, as well as snacks to eat in or take away. To ensure a continuity of service, we suggest you take your break at Restaurant 1 or Restaurant 3 (Prévessin).

  14. Preparing for the Downsizing and Closure of Letterman Army Medical Center: A Case Study

    Science.gov (United States)

    1991-06-17

    and closure of Lieutenant Colonel F. William Brown believed in the value of this project, encouraged , and guided me during conceptualization , design...issues dirocled Sn the RW docnent repository were coded within this framwork . The muiaion category was coded 1 if primary or secmonay care waM affected

  15. Anterior Segment Imaging Predicts Incident Gonioscopic Angle Closure.

    Science.gov (United States)

    Baskaran, Mani; Iyer, Jayant V; Narayanaswamy, Arun K; He, Yingke; Sakata, Lisandro M; Wu, Renyi; Liu, Dianna; Nongpiur, Monisha E; Friedman, David S; Aung, Tin

    2015-12-01

    To investigate the incidence of gonioscopic angle closure after 4 years in subjects with gonioscopically open angles but varying degrees of angle closure detected on anterior segment optical coherence tomography (AS OCT; Visante; Carl Zeiss Meditec, Dublin, CA) at baseline. Prospective, observational study. Three hundred forty-two subjects, mostly Chinese, 50 years of age or older, were recruited, of whom 65 were controls with open angles on gonioscopy and AS OCT at baseline, and 277 were cases with baseline open angles on gonioscopy but closed angles (1-4 quadrants) on AS OCT scans. All subjects underwent gonioscopy and AS OCT at baseline (horizontal and vertical single scans) and after 4 years. The examiner performing gonioscopy was masked to the baseline and AS OCT data. Angle closure in a quadrant was defined as nonvisibility of the posterior trabecular meshwork by gonioscopy and visible iridotrabecular contact beyond the scleral spur in AS OCT scans. Gonioscopic angle closure in 2 or 3 quadrants after 4 years. There were no statistically significant differences in age, ethnicity, or gender between cases and controls. None of the control subjects demonstrated gonioscopic angle closure after 4 years. Forty-eight of the 277 subjects (17.3%; 95% confidence interval [CI], 12.8-23; P < 0.0001) with at least 1 quadrant of angle closure on AS OCT at baseline demonstrated gonioscopic angle closure in 2 or more quadrants, whereas 28 subjects (10.1%; 95% CI, 6.7-14.6; P < 0.004) demonstrated gonioscopic angle closure in 3 or more quadrants after 4 years. Individuals with more quadrants of angle closure on baseline AS OCT scans had a greater likelihood of gonioscopic angle closure developing after 4 years (P < 0.0001, chi-square test for trend for both definitions of angle closure). Anterior segment OCT imaging at baseline predicts incident gonioscopic angle closure after 4 years among subjects who have gonioscopically open angles and iridotrabecular contact on AS OCT at

  16. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  17. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  18. Randomized clinical trial of intestinal ostomy takedown comparing pursestring wound closure vs conventional closure to eliminate the risk of wound infection.

    Science.gov (United States)

    Camacho-Mauries, Daniel; Rodriguez-Díaz, José Luis; Salgado-Nesme, Noel; González, Quintín H; Vergara-Fernández, Omar

    2013-02-01

    The use of temporary stomas has been demonstrated to reduce septic complications, especially in high-risk anastomosis; therefore, it is necessary to reduce the number of complications secondary to ostomy takedowns, namely wound infection, anastomotic leaks, and intestinal obstruction. To compare the rates of superficial wound infection and patient satisfaction after pursestring closure of ostomy wound vs conventional linear closure. Patients undergoing colostomy or ileostomy closure between January 2010 and February 2011 were randomly assigned to linear closure (n = 30) or pursestring closure (n = 31) of their ostomy wound. Wound infection within 30 days of surgery was defined as the presence of purulent discharge, pain, erythema, warmth, or positive culture for bacteria. Patient satisfaction, healing time, difficulty managing the wound, and limitation of activities were analyzed with the Likert questionnaire. The infection rate for the control group was 36.6% (n = 11) vs 0% in the pursestring closure group (p ostomy wound closure (shorter healing time and improved patient satisfaction).

  19. Yucca Mountain project container fabrication, closure and non-destructive evaluation development activities

    International Nuclear Information System (INIS)

    Russell, E.W.; Nelson, T.A.

    1989-06-01

    In this presentation, container fabrication, closure, and non-destructive evaluation (NDE) process development activities are described. All of these activities are interrelated, and will contribute to the metal barrier selection activity. The plan is to use a corrosion-resistant material in the form of a cylinder with a wall thickness of ∼1cm (2cm for pure copper.) The materials under consideration include the three austenitic alloys: stainless steel-304L, stainless steel-316L and alloy 825, as well as the three copper alloys: CDA 102, CDA 613, and CDA 715. This document reviews the recommended procedures and processes for fabricating, closing and evaluating each of the candidate materials

  20. Patent ductus arteriosus closure using an Amplatzer(™) ventricular septal defect closure device.

    Science.gov (United States)

    Fernando, Rajeev; Koranne, Ketan; Loyalka, Pranav; Kar, Biswajit; Gregoric, Igor

    2013-01-01

    The ductus arteriosus originates from the persistence of the distal portion of the left sixth aortic arch. It connects the descending aorta (immediately distal to the left subclavian artery) to the roof of the main pulmonary artery, near the origin of the left pulmonary artery. Persistence of the duct beyond 48 h after birth is abnormal and results in patent ductus arteriosus (PDA). PDA is rare in adults because it is usually discovered and treated in childhood. Mechanical closure remains the definitive therapy because the patency of ductus arteriosus may lead to multiple complications, depending on the size and flow through the ductus. PDA closure is indicated in patients with symptoms and evidence of left heart enlargement, and in patients with elevated pulmonary pressures when reversal is possible. Transcatheter closure is the preferred technique in adults because it avoids sternotomy, reduces the length of hospital stay and is associated with fewer complications compared with surgery. First demonstrated in 1967, both the technique and the occluder devices used have since evolved. However, designing an ideal PDA occluder has been a challenge due to the variability in size, shape and orientation of PDAs. The present article describes a case involving a 35-year-old woman who presented to the Center for Advanced Heart Failure (Houston, USA) with congestive heart failure due to a large PDA, which was successfully occluded using an Amplatzer (St Jude Medical, USA) muscular ventricular septal defect closure device. The wider waist and dual-retention discs of these ventricular septal defect closure devices may be important factors to consider in the future development of devices for the occlusion of large PDAs.

  1. Temporary Closure of the Open Abdomen: A Systematic Review on Delayed Primary Fascial Closure in Patients with an Open Abdomen

    NARCIS (Netherlands)

    Boele van Hensbroek, Pieter; Wind, Jan; Dijkgraaf, Marcel G. W.; Busch, Olivier R. C.; Goslings, J. Carel

    2009-01-01

    Background This study was designed to systematically review the literature to assess which temporary abdominal closure (TAC) technique is associated with the highest delayed primary fascial closure (FC) rate. In some cases of abdominal trauma or infection, edema or packing precludes fascial closure

  2. NEA perspectives on timescales and criteria in post-closure safety of geological disposal

    International Nuclear Information System (INIS)

    Preter, P. de; Smith, P.; Pescatore, C.; Forinash, B.

    2006-01-01

    A key challenge in the development of safety cases for geological repositories is associated with the long periods of time over which radioactive wastes that are disposed of in repositories remain hazardous. The OECD Nuclear Energy Agency (NEA) has recently examined issues related to timescales in the context of two projects under the auspices of the Radioactive Waste Management Committee (RWMC): the Timescales Initiative and the Long-Term Safety Criteria (LTSC) Initiative. These projects examine, respectively, the treatment of timescales in actual safety cases and in the development of radiological protection criteria for geological disposal. They treat different aspects of timescales but have some overlap and have shown some convergence of the results achieved to date. Based on these projects, this paper examines general considerations in the handling of timescales, including ethical principles, evolution of the hazards of radioactive waste over time, and uncertainty in the evolution of repository systems (including geological features). The implications of these considerations are examined in terms of repository siting; levels of protection in regulations; planning for pre-closure and post-closure actions; and development and presentation of safety cases. A comparison is made with previous NEA work related to timescales, in order to show evolutions in current understanding. (authors)

  3. NEA perspectives on timescales and criteria in post-closure safety of geological disposal

    Energy Technology Data Exchange (ETDEWEB)

    Preter, P. de [ONDRAF/NIRAS, Brussels (Belgium); Smith, P. [Safety Assessment Management Ltd, SAM Ltd. (United Kingdom); Pescatore, C.; Forinash, B. [OECD/NEA, Nuclear Energy Agency, 92 - Issy les Moulineaux (France)

    2006-07-01

    A key challenge in the development of safety cases for geological repositories is associated with the long periods of time over which radioactive wastes that are disposed of in repositories remain hazardous. The OECD Nuclear Energy Agency (NEA) has recently examined issues related to timescales in the context of two projects under the auspices of the Radioactive Waste Management Committee (RWMC): the Timescales Initiative and the Long-Term Safety Criteria (LTSC) Initiative. These projects examine, respectively, the treatment of timescales in actual safety cases and in the development of radiological protection criteria for geological disposal. They treat different aspects of timescales but have some overlap and have shown some convergence of the results achieved to date. Based on these projects, this paper examines general considerations in the handling of timescales, including ethical principles, evolution of the hazards of radioactive waste over time, and uncertainty in the evolution of repository systems (including geological features). The implications of these considerations are examined in terms of repository siting; levels of protection in regulations; planning for pre-closure and post-closure actions; and development and presentation of safety cases. A comparison is made with previous NEA work related to timescales, in order to show evolutions in current understanding. (authors)

  4. Special closures for steel drum shipping containers

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Otts, J.V.

    1976-01-01

    The objective of this program was to develop special lid closures for typical, steel drum, radioactive material shipping containers. Previous experience and testing had shown that the existing container was adequate to withstand the required environmental tests for certification, but that the lid and closure were just marginally effective. Specifically, the lid closure failed to consistently maintain a tight seal between the container and the lid after drop tests, thus causing the package contents to be vulnerable in the subsequent fire test. Recognizing the deficiency, the United States Energy Research and Development Administration requested the development of new closure(s) which would: (1) be as strong and resistant to a drop as the bottom of the container; (2) have minimal economic impact on the overall container cost; (3) maximize the use of existing container designs; (4) consider crush loads; and (5) result in less dependence on personnel and loading procedures. Several techniques were evaluated and found to be more effective than the standard closure mechanism. Of these, three new closure techniques were designed, fabricated, and proven to be structurally adequate to provide containment when a 454-kg drum was drop tested from 9.14-m onto an unyielding surface. The three designs were: (1) a 152-mm long lid extension or skirt welded to the standard drum lid, (2) a separate inner lid, with 152-mm long skirt and (3) C-clamps used at the container-lid interface. Based upon structural integrity, economic impact, and minimal design change, the lid extension is the recommended special closure

  5. Preservation and Implementation of Decommissioning Lessons Learned in the United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Rodriguez, Rafael L.

    2008-01-01

    Over the past several years, the United States Nuclear Regulatory Commission (NRC) has actively worked to capture and preserve lessons learned from the decommissioning of nuclear facilities. More recently, NRC has involved industry groups, the Organization of Agreement States (OAS), and the Department of Energy (DOE) in the effort to develop approaches to capture, preserve and disseminate decommissioning lessons learned. This paper discusses the accomplishments of the working group, some lessons learned by the NRC in the recent past, and how NRC will incorporate these lessons learned into its regulatory framework. This should help ensure that the design and operation of current and future nuclear facilities will result in less environmental impact and more efficient decommissioning. In summary, the NRC will continue capturing today's experience in decommissioning so that future facilities can take advantage of lessons learned from today's decommissioning projects. NRC, both individually and collectively with industry groups, OAS, and DOE, is aggressively working on the preservation and implementation of decommissioning lessons learned. The joint effort has helped to ensure the lessons from the whole spectrum of decommissioning facilities (i.e., reactor, fuel cycle, and material facilities) are better understood, thus maximizing the amount of knowledge and best practices obtained from decommissioning activities. Anticipated regulatory activities at the NRC will make sure that the knowledge gained from today's decommissioning projects is preserved and implemented to benefit the nuclear facilities that will decommission in the future

  6. CLIL in physics lessons at grammar school

    Science.gov (United States)

    Štefančínová, Iveta; Valovičová, Ľubomíra

    2017-01-01

    Content and Language Integrated Learning (CLIL) is one of the most outstanding approaches in foreign language teaching. This teaching method has promising prospects for the future of modern education as teaching subject and foreign languages are combined to offer a better preparation for life in Europe, especially when the mobility is becoming a highly significant factor of everyday life. We realized a project called Foreign languages in popularizing science at grammar school. Within the project five teachers with approbation subjects of English, French, German and Physics attended the methodological courses abroad. The teachers applied the gained experience in teaching and linking science teaching with the teaching of foreign languages. Outputs of the project (e.g. English-German-French-Slovak glossary of natural science terminology, student activity sheets, videos with natural science orientation in a foreign language, physical experiments in foreign languages, multimedia fairy tales with natural contents, posters of some scientists) are prepared for the CLIL-oriented lessons. We collected data of the questionnaire for students concerning attitude towards CLIL. The questionnaire for teachers showed data about the attitude, experience, and needs of teachers employing CLIL in their lessons.

  7. Some Recent Developments in Turbulence Closure Modeling

    Science.gov (United States)

    Durbin, Paul A.

    2018-01-01

    Turbulence closure models are central to a good deal of applied computational fluid dynamical analysis. Closure modeling endures as a productive area of research. This review covers recent developments in elliptic relaxation and elliptic blending models, unified rotation and curvature corrections, transition prediction, hybrid simulation, and data-driven methods. The focus is on closure models in which transport equations are solved for scalar variables, such as the turbulent kinetic energy, a timescale, or a measure of anisotropy. Algebraic constitutive representations are reviewed for their role in relating scalar closures to the Reynolds stress tensor. Seamless and nonzonal methods, which invoke a single closure model, are reviewed, especially detached eddy simulation (DES) and adaptive DES. Other topics surveyed include data-driven modeling and intermittency and laminar fluctuation models for transition prediction. The review concludes with an outlook.

  8. Relative expressive power of navigational querying on graphs using transitive closure

    OpenAIRE

    Surinx, Dimitri; Fletcher, George H. L.; Gyssens, Marc; Leinders, Dirk; Van den Bussche, Jan; Van Gucht, Dirk; Vansummeren, Stijn; Wu, Yuqing

    2015-01-01

    Motivated by both established and new applications, we study navigational query languages for graphs (binary relations). The simplest language has only the two operators union and composition, together with the identity relation. We make more powerful languages by adding any of the following operators: intersection; set difference; projection; coprojection; converse; transitive closure; and the diversity relation. All these operators map binary relations to binary relations. We compare the ex...

  9. Analysis of Mining-induced Valley Closure Movements

    Science.gov (United States)

    Zhang, C.; Mitra, R.; Oh, J.; Hebblewhite, B.

    2016-05-01

    Valley closure movements have been observed for decades in Australia and overseas when underground mining occurred beneath or in close proximity to valleys and other forms of irregular topographies. Valley closure is defined as the inward movements of the valley sides towards the valley centreline. Due to the complexity of the local geology and the interplay between several geological, topographical and mining factors, the underlying mechanisms that actually cause this behaviour are not completely understood. A comprehensive programme of numerical modelling investigations has been carried out to further evaluate and quantify the influence of a number of these mining and geological factors and their inter-relationships. The factors investigated in this paper include longwall positional factors, horizontal stress, panel width, depth of cover and geological structures around the valley. It is found that mining in a series passing beneath the valley dramatically increases valley closure, and mining parallel to valley induces much more closure than other mining orientations. The redistribution of horizontal stress and influence of mining activity have also been recognised as important factors promoting valley closure, and the effect of geological structure around the valley is found to be relatively small. This paper provides further insight into both the valley closure mechanisms and how these mechanisms should be considered in valley closure prediction models.

  10. Biomechanics Strategies for Space Closure in Deep Overbite

    Directory of Open Access Journals (Sweden)

    Harryanto Wijaya

    2013-07-01

    Full Text Available Space closure is an interesting aspect of orthodontic treatment related to principles of biomechanics. It should be tailored individually based on patient’s diagnosis and treatment plan. Understanding the space closure biomechanics basis leads to achieve the desired treatment objective. Overbite deepening and losing posterior anchorage are the two most common unwanted side effects in space closure. Conventionally, correction of overbite must be done before space closure resulted in longer treatment. Application of proper space closure biomechanics strategies is necessary to achieve the desired treatment outcome. This cases report aimed to show the space closure biomechanics strategies that effectively control the overbite as well as posterior anchorage in deep overbite patients without increasing treatment time. Two patients who presented with class II division 1 malocclusion were treated with fixed orthodontic appliance. The primary strategies included extraction space closure on segmented arch that employed two-step space closure, namely single canine retraction simultaneously with incisors intrusion followed by enmasse retraction of four incisors by using differential moment concept. These strategies successfully closed the space, corrected deep overbite and controlled posterior anchorage simultaneously so that the treatment time was shortened. Biomechanics strategies that utilized were effective to achieve the desired treatment outcome.

  11. Magnetisable container closure and means for its removal

    International Nuclear Information System (INIS)

    Barrett, W.I.

    1984-01-01

    A container has a closed lower end and an open upper end, is made of a non-magnetic material such as aluminium, and has a peripheral groove spaced from the open end. A disc-like closure is of magnetic material such as ferritic steel, has a pair of spring jaws joined to the disc by a joining member such that when the disc of the closure is in position closing the open end of the container, the jaws engage in groove and hold the closure in position. To remove the closure, it is engaged by magnetic means mounted for example on a wall and having a step such that when the container is moved laterally away the closure is retained by the magnetic means aided by the step and thereby the closure becomes removed from the container. (author)

  12. Low level waste shipment accident lessons learned

    International Nuclear Information System (INIS)

    Rast, D.M.; Rowe, J.G.; Reichel, C.W.

    1995-01-01

    On October 1, 1994 a shipment of low-level waste from the Fernald Environmental Management Project, Fernald, Ohio, was involved in an accident near Rolla, Missouri. The accident did not result in the release of any radioactive material. The accident did generate important lessons learned primarily in the areas of driver and emergency response communications. The shipment was comprised of an International Standards Organization (ISO) container on a standard flatbed trailer. The accident caused the low-level waste package to separate from the trailer and come to rest on its top in the median. The impact of the container with the pavement and median inflicted relatively minor damage to the container. The damage was not substantial enough to cause failure of container integrity. The success of the package is attributable to the container design and the packaging procedures used at the Fernald Environmental Management Project for low-level waste shipments. Although the container survived the initial wreck, is was nearly breached when the first responders attempted to open the ISO container. Even though the container was clearly marked and the shipment documentation was technically correct, this information did not identify that the ISO container was the primary containment for the waste. The lessons learned from this accident have DOE complex wide applicability. This paper is intended to describe the accident, subsequent emergency response operations, and the lessons learned from this incident

  13. Urethrovaginal fistula closure.

    Science.gov (United States)

    Clifton, Marisa M; Goldman, Howard B

    2017-01-01

    In the developed world, urethrovaginal fistulas are most the likely the result of iatrogenic injury. These fistulas are quite rare. Proper surgical repair requires careful dissection and tension-free closure. The objective of this video is to demonstrate the identification and surgical correction of an urethrovaginal fistula. The case presented is of a 59-year-old woman with a history of pelvic organ prolapse and symptomatic stress urinary incontinence who underwent vaginal hysterectomy, anterior colporrhaphy, posterior colporrhaphy, and synthetic sling placement. Postoperatively, she developed a mesh extrusion and underwent sling excision. After removal of her synthetic sling, she began to experience continuous urinary incontinence. Physical examination and cystourethroscopy demonstrated an urethrovaginal fistula at the midurethra. Options were discussed and the patient wished to undergo transvaginal fistula repair. The urethrovaginal fistula was intubated with a Foley catheter. The fistula tract was isolated and removed. The urethra was then closed with multiple tension-free layers. This video demonstrates several techniques for identifying and subsequently repairing an urethrovaginal fistula. Additionally, it demonstrates the importance of tension-free closure. Urethrovaginal fistulas are rare. They should be repaired with careful dissection and tension-free closure.

  14. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-12-01

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  15. Machine Learning-based discovery of closures for reduced models of dynamical systems

    Science.gov (United States)

    Pan, Shaowu; Duraisamy, Karthik

    2017-11-01

    Despite the successful application of machine learning (ML) in fields such as image processing and speech recognition, only a few attempts has been made toward employing ML to represent the dynamics of complex physical systems. Previous attempts mostly focus on parameter calibration or data-driven augmentation of existing models. In this work we present a ML framework to discover closure terms in reduced models of dynamical systems and provide insights into potential problems associated with data-driven modeling. Based on exact closure models for linear system, we propose a general linear closure framework from viewpoint of optimization. The framework is based on trapezoidal approximation of convolution term. Hyperparameters that need to be determined include temporal length of memory effect, number of sampling points, and dimensions of hidden states. To circumvent the explicit specification of memory effect, a general framework inspired from neural networks is also proposed. We conduct both a priori and posteriori evaluations of the resulting model on a number of non-linear dynamical systems. This work was supported in part by AFOSR under the project ``LES Modeling of Non-local effects using Statistical Coarse-graining'' with Dr. Jean-Luc Cambier as the technical monitor.

  16. Influences of Multimedia Lesson Contents On Effective Learning

    Directory of Open Access Journals (Sweden)

    Tuncay Yavuz Ozdemir

    2013-11-01

    Full Text Available In the information era that we experience today, there is a rapid change in the methods, techniques and materials used for education and teaching. The usage of information and communication technology-assisted teaching materials are becoming more commonplace. Parallel to these developments, the Ministry of National Education took steps to develop IT substructures of all schools in the country and implemented many projects. The purpose of this study is to determine whether or not the multimedia lesson content used by teachers affect effective learning. This study is a qualitative study, conducted with 45 teachers working in primary schools during the 2011-2012 academic year. According to the study findings, participants believe that using multimedia lesson content during lectures increases student motivation, makes students more curious and interested, and think that using multimedia lesson content has positive effects.

  17. Lessons Learned from the Private Sector

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, Robert J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-07

    This session is focused on lessons learned from private sector energy projects that could be applied to the federal sector. This presentation tees up the subsequent presentations by outlining the differences between private and federal sectors in objectives, metrics for determining success, funding resources/mechanisms, payback and ROI evaluation, risk tolerance/aversion, new technology adoption perspectives, and contracting mechanisms.

  18. Closure Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    International Nuclear Information System (INIS)

    Campbell, K.B.

    2001-11-01

    This Closure Report provides the documentation for closure of the Central Nevada Test Area (CNTA) surface Corrective Action Unit (CAU) 417. The CNTA is located in Hot Creek Valley in Nye County, Nevada, approximately 22.5 kilometers (14 miles) west of U.S. State Highway 6 near the Moores Station historical site, and approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. A nuclear device for Project Faultless was detonated approximately 975 meters (3,200 feet) below ground surface on January 19, 1968, in emplacement boring UC-1 (Department of Energy, Nevada Operation Office [DOE/NV], 1997). CAU 417 consists of 34 Corrective Action Sites (CASs). Site closure was completed using a Nevada Department of Environmental Protection (NDEP) approved Corrective Action Plan (CAP) (DOE/NV, 2000) which was based on the recommendations presented in the NDEP-approved Corrective Action Decision Document (DOE/NV, 1999). Closure of CAU 417 was completed in two phases. Phase I field activities were completed with NDEP concurrence during 1999 as outlined in the Phase I Work Plan, Appendix A of the CAP (DOE/NV, 2000), and as summarized in Section 2.1.2 of this document

  19. Closure of shallow underground injection wells

    International Nuclear Information System (INIS)

    Veil, J.A.; Grunewald, B.

    1993-01-01

    Shallow injection wells have long been used for disposing liquid wastes. Some of these wells have received hazardous or radioactive wastes. According to US Environmental Protection Agency (EPA) regulations, Class IV wells are those injection wells through which hazardous or radioactive wastes are injected into or above an underground source of drinking water (USDW). These wells must be closed. Generally Class V wells are injection wells through which fluids that do not contain hazardous or radioactive wastes are injected into or above a USDW. Class V wells that are responsible for violations of drinking water regulations or that pose a threat to human health must also be closed. Although EPA regulations require closure of certain types of shallow injection wells, they do not provide specific details on the closure process. This paper describes the regulatory background, DOE requirements, and the steps in a shallow injection well closure process: Identification of wells needing closure; monitoring and disposal of accumulated substances; filling and sealing of wells; and remediation. In addition, the paper describes a major national EPA shallow injection well enforcement initiative, including closure plan guidance for wells used to dispose of wastes from service station operations

  20. Reliability assessment of underground shaft closure

    International Nuclear Information System (INIS)

    Fossum, A.F.; Munson, D.E.

    1994-01-01

    The intent of the WIPP, being constructed in the bedded geologic salt deposits of Southeastern New Mexico, is to provide the technological basis for the safe disposal of radioactive Transuranic (TRU) wastes generated by the defense programs of the United States. In determining this technological basis, advanced reliability and structural analysis techniques are used to determine the probability of time-to-closure of a hypothetical underground shaft located in an argillaceous salt formation and filled with compacted crushed salt. Before being filled with crushed salt for sealing, the shaft provides access to an underground facility. Reliable closure of the shaft depends upon the sealing of the shaft through creep closure and recompaction of crushed backfill. Appropriate methods are demonstrated to calculate cumulative distribution functions of the closure based on laboratory determined random variable uncertainty in salt creep properties

  1. Lessons Learned from Developing a Patient Engagement Panel: An OCHIN Report.

    Science.gov (United States)

    Arkind, Jill; Likumahuwa-Ackman, Sonja; Warren, Nate; Dickerson, Kay; Robbins, Lynn; Norman, Kathy; DeVoe, Jennifer E

    2015-01-01

    There is renewed interest in patient engagement in clinical and research settings, creating a need for documenting and publishing lessons learned from efforts to meaningfully engage patients. This article describes early lessons learned from the development of OCHIN's Patient Engagement Panel (PEP). OCHIN supports a national network of more than 300 community health centers (CHCs) and other primary care settings that serve over 1.5 million patients annually across nearly 20 states. The PEP was conceived in 2009 to harness the CHC tradition of patient engagement in this new era of patient-centered outcomes research and to ensure that patients were engaged throughout the life cycle of our research projects, from conception to dissemination. Developed by clinicians and researchers within our practice-based research network, recruitment of patients to serve as PEP members began in early 2012. The PEP currently has a membership of 18 patients from 3 states. Over the past 24 months, the PEP has been involved with 12 projects. We describe developing the PEP and challenges and lessons learned (eg, recruitment, funding model, creating value for patient partners, compensation). These lessons learned are relevant not only for research but also for patient engagement in quality improvement efforts and other clinical initiatives. © Copyright 2015 by the American Board of Family Medicine.

  2. Successes and challenges of north-south partnerships - key lessons from the African/Asian Regional Capacity Development projects.

    Science.gov (United States)

    Färnman, Rosanna; Diwan, Vishal; Zwarenstein, Merrick; Atkins, Salla

    2016-01-01

    Increasing efforts are being made globally on capacity building. North-south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs) over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE) projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north-south and south-south partnerships that evolved during the project were the main achievement. However, others found there to be a 'north-south divide' in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed appropriately for all partner institutions. Some challenges were underestimated

  3. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL & REGULATORY COLLABORATION

    Energy Technology Data Exchange (ETDEWEB)

    JARAYSI, M.N.

    2007-01-08

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure.

  4. Comparison of cost-effectiveness and postoperative outcome of device closure and open surgery closure techniques for treatment of patent ductus arteriosus

    Directory of Open Access Journals (Sweden)

    Alireza Ahmadi

    2014-01-01

    Full Text Available BACKGROUND: Various devices have been recently employed for percutaneous closure of the patent ductus arteriosus (PDA. Although the high effectiveness of device closure techniques has been clearly determined, a few studies have focused on the cost-effectiveness and also postoperative complications of these procedures in comparison with open surgery. The present study aimed to evaluate the clinical outcome and cost-effectiveness of PDA occlusion by Amplatzer and coil device in comparisong with open surgery. METHODS: In this cross-sectional study, a randomized sample of 201 patients aged 1 month to 16 years (105 patients with device closure and 96 patients with surgical closure was selected. The ratio of total pulmonary blood flow to total systemic blood flow, the Qp/Qs ratio, was measured using a pulmonary artery catheter. The cost analysis included direct medical care costs associated with device implantation and open surgery, as well as professional fees. All costs were calculated in Iranian Rials and then converted to US dollars. RESULTS: There was no statistical difference in mean Qp/Qs ratio before the procedure between the device closure group and the open surgery group (2.1 ± 0.7 versus 1.7 ± 0.6, P = 0.090. The mean measured costs were overall higher in the device closure group than in open closure group (948.87 ± 548.76 US$ versus 743.70 ± 696.91 US$, P < 0.001. This difference remained significant after adjustment for age and gender (Standardized Beta = 0.160, P = 0.031. PDA closure with the Amplatzer ductal occluder (1053.05 ± 525.73 US$ or with Nit-Occlud coils (PFM (912.73 ± 565.94 US$, P < 0.001 was more expensive than that via open surgery. However, the Cook detachable spring coils device closure (605.65 ± 194.62 US$, P = 0.650 had a non-significant cost difference with open surgery. No event was observed in the device closure group regarding in-hospital mortality or morbidity; however, in another group, 2 in-hospital deaths

  5. Numerical approximation of the Boltzmann equation : moment closure

    NARCIS (Netherlands)

    Abdel Malik, M.R.A.; Brummelen, van E.H.

    2012-01-01

    This work applies the moment method onto a generic form of kinetic equations to simplify kinetic models of particle systems. This leads to the moment closure problem which is addressed using entropy-based moment closure techniques utilizing entropy minimization. The resulting moment closure system

  6. WASTE PACKAGE OPERATIONS FY99 CLOSURE METHODS REPORT

    Energy Technology Data Exchange (ETDEWEB)

    M. C. Knapp

    1999-09-23

    The waste package (WP) closure weld development task is part of a larger engineering development program to develop waste package designs. The purpose of the larger waste package engineering development program is to develop nuclear waste package fabrication and closure methods that the Nuclear Regulatory Commission will find acceptable and will license for disposal of spent nuclear fuel (SNF), non-fuel components, and vitrified high-level waste within a Monitored Geologic Repository (MGR). Within the WP closure development program are several major development tasks, which, in turn, are divided into subtasks. The major tasks include: WP fabrication development, WP closure weld development, nondestructive examination (NDE) development, and remote in-service inspection development. The purpose of this report is to present the objectives, technical information, and work scope relating to the WP closure weld development.and NDE tasks and subtasks and to report results of the closure weld and NDE development programs for fiscal year 1999 (FY-99). The objective of the FY-99 WP closure weld development task was to develop requirements for closure weld surface and volumetric NDE performance demonstrations, investigate alternative NDE inspection techniques, and develop specifications for welding, NDE, and handling system integration. In addition, objectives included fabricating several flat plate mock-ups that could be used for NDE development, stress relief peening, corrosion testing, and residual stress testing.

  7. WASTE PACKAGE OPERATIONS FY-99 CLOSURE METHODS REPORT

    International Nuclear Information System (INIS)

    M. C. Knapp

    1999-01-01

    The waste package (WP) closure weld development task is part of a larger engineering development program to develop waste package designs. The purpose of the larger waste package engineering development program is to develop nuclear waste package fabrication and closure methods that the Nuclear Regulatory Commission will find acceptable and will license for disposal of spent nuclear fuel (SNF), non-fuel components, and vitrified high-level waste within a Monitored Geologic Repository (MGR). Within the WP closure development program are several major development tasks, which, in turn, are divided into subtasks. The major tasks include: WP fabrication development, WP closure weld development, nondestructive examination (NDE) development, and remote in-service inspection development. The purpose of this report is to present the objectives, technical information, and work scope relating to the WP closure weld development.and NDE tasks and subtasks and to report results of the closure weld and NDE development programs for fiscal year 1999 (FY-99). The objective of the FY-99 WP closure weld development task was to develop requirements for closure weld surface and volumetric NDE performance demonstrations, investigate alternative NDE inspection techniques, and develop specifications for welding, NDE, and handling system integration. In addition, objectives included fabricating several flat plate mock-ups that could be used for NDE development, stress relief peening, corrosion testing, and residual stress testing

  8. T-tube vs Primary Common Bile Duct Closure

    Directory of Open Access Journals (Sweden)

    M R Joshi

    2010-09-01

    Full Text Available INTRODUCTION: Closure of the common bile duct over T-tube after exploration is a widely practiced traditional method. However, its use may give rise to many complications. We do primary closure of common bile duct after exploration. Aim of the study is to see the efficacy and safety of the primary closure. METHODS: Study was carried out to compare the results of both the techniques from 2006 to 2009 in the cases proven to have common bile duct stone with or without the features of obstructive jaundice. Post operative hospital stay and morbidities related to both the groups were recorded and analyzed. RESULTS: There were total 71 cases included in the study. Thirty one in T-tube group and 40 in primary closure group. T-tube was removed in most of the cases after three weeks where as average time of drain removal in primary closure group is 5.79 +/-1.79 days. Incidence of retained stone was equal in each group. Major complication in T-tube group is biliary peritonitis in four patients at the time of T-tube removal whereas none of the patient from primary closure group suffered from such major complication. CONCLUSIONS: Primary closure after the common bile duct exploration is safe and it helps to avoid the morbidities related to T-tube. Keywords: Choledocholithiasis, Primary closure, retained stone, T-tube, Ureterorenoscope.

  9. SEL/Project Language. Level II, Kindergarten, Volume I (Lessons 1-16).

    Science.gov (United States)

    Valladares, Ann E.; And Others

    The document is an intervention curriculum guide designed to facilitate the initial adjustment of disadvantaged Southeastern children to kindergarten or first grade. The major emphasis is on the teaching of language skills in combination with subject matter learning using a language-experience approach. This volume contains Lessons 1-16 of a…

  10. Project Choice: Lessons Learned.

    Science.gov (United States)

    Ewing Marion Kauffman Foundation, Kansas City, MO.

    Project Choice began with a simple goal: to increase the number of inner-city students who graduate from high school on time and become productive members of society. To that end, Ewing M. Kauffman, his Foundation, and associates designed and implemented a program that promised postsecondary education or training to some students in the Kansas…

  11. Accelerating cleanup: Paths to closure

    International Nuclear Information System (INIS)

    1998-06-01

    This report describes the status of Environmental Management's (EM's) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE's 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM's accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document

  12. Techniques for Abdominal Wall Closure after Damage Control Laparotomy: From Temporary Abdominal Closure to Early/Delayed Fascial Closure—A Review

    Directory of Open Access Journals (Sweden)

    Qian Huang

    2016-01-01

    Full Text Available Open abdomen (OA has been an effective treatment for abdominal catastrophes in traumatic and general surgery. However, management of patients with OA remains a formidable task for surgeons. The central goal of OA is closure of fascial defect as early as is clinically feasible without precipitating abdominal compartment syndrome. Historically, techniques such as packing, mesh, and vacuum-assisted closure have been developed to assist temporary abdominal closure, and techniques such as components separation, mesh-mediated traction, bridging fascial defect with permanent synthetic mesh, or biologic mesh have also been attempted to achieve early primary fascial closure, either alone or in combined use. The objective of this review is to present the challenges of these techniques for OA with a goal of early primary fascial closure, when the patient’s physiological condition allows.

  13. Uncertainty Quantification of Multi-Phase Closures

    Energy Technology Data Exchange (ETDEWEB)

    Nadiga, Balasubramanya T. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baglietto, Emilio [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-10-27

    In the ensemble-averaged dispersed phase formulation used for CFD of multiphase ows in nuclear reactor thermohydraulics, closures of interphase transfer of mass, momentum, and energy constitute, by far, the biggest source of error and uncertainty. Reliable estimators of this source of error and uncertainty are currently non-existent. Here, we report on how modern Validation and Uncertainty Quanti cation (VUQ) techniques can be leveraged to not only quantify such errors and uncertainties, but also to uncover (unintended) interactions between closures of di erent phenomena. As such this approach serves as a valuable aide in the research and development of multiphase closures. The joint modeling of lift, drag, wall lubrication, and turbulent dispersion|forces that lead to tranfer of momentum between the liquid and gas phases|is examined in the frame- work of validation of the adiabatic but turbulent experiments of Liu and Banko , 1993. An extensive calibration study is undertaken with a popular combination of closure relations and the popular k-ϵ turbulence model in a Bayesian framework. When a wide range of super cial liquid and gas velocities and void fractions is considered, it is found that this set of closures can be validated against the experimental data only by allowing large variations in the coe cients associated with the closures. We argue that such an extent of variation is a measure of uncertainty induced by the chosen set of closures. We also nd that while mean uid velocity and void fraction pro les are properly t, uctuating uid velocity may or may not be properly t. This aspect needs to be investigated further. The popular set of closures considered contains ad-hoc components and are undesirable from a predictive modeling point of view. Consequently, we next consider improvements that are being developed by the MIT group under CASL and which remove the ad-hoc elements. We use non-intrusive methodologies for sensitivity analysis and calibration (using

  14. Factors affecting closure of a temporary stoma.

    Science.gov (United States)

    Taylor, Claire; Varma, Sarah

    2012-01-01

    The purpose of the study was to examine time to reversal of a temporary ostomy, reasons for delayed closure, and patient satisfaction with the scheduling of their closure and related hospital care. Cross-sectional, descriptive study. The target population comprised patients who underwent creation of a temporary ostomy and reversal surgery within one National Health System Hospital Trust in the United Kingdom. The population served by this Trust are ethnically and socioeconomically diverse, predominantly living in urban areas around Greater London. Sixty-one persons who met inclusion criteria were identified. A two-step analytical process was undertaken. First, a literature review examining incidence and causes of delayed stoma closure was undertaken. Second, a postal survey of all patients who had had their stoma closed in 2009 was conducted. Respondents were allowed 2 weeks to complete and return the questionnaire. The survey instrument was developed locally and subjected to content validation using ostomy patients, surgical and nursing colleagues. It consisted of 9 questions querying time from original surgery to closure, reasons for delaying closure surgery beyond 12 weeks, and satisfaction with care. Twenty-seven patients returned their questionnaires, indicating they consented to participate; a response rate of 44%. Half of the respondents (n = 14 [52%]) underwent closure surgery within 6 months of stoma formation; the remaining 48% waited more than 6 months (median: 6.5 months, range: 1.5-26 months). Thirteen patients (48%) reported a delay in receiving their stoma closure; the main reason cited was the need for a course of adjuvant postoperative chemotherapy. Three quarters of respondents (22 [74%]) were satisfied with the overall care they received. Findings from this study suggest that stoma closure may be associated with fewest complications if performed before 12 weeks.

  15. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  16. LESSONS LEARNED THROUGH OPTIMIZATION OF THE VOLUNTARY CORRECTIVE ACTION PROCESS

    International Nuclear Information System (INIS)

    Thacker, M. S.; Freshour, P.; McDonald, W.

    2002-01-01

    Valuable experience in environmental remediation was gained at Sandia National Laboratories/New Mexico (Sandia) by concurrently conducting Voluntary Corrective Actions (VCAs) at three Solid Waste Management Units (SWMUs). Sandia combined the planning, implementation, and reporting phases of three VCAs with the goal of realizing significant savings in both cost and schedule. The lessons learned through this process have been successfully implemented within the Sandia Environmental Restoration (ER) Project and could be utilized at other locations with multiple ER sites. All lessons learned resulted from successful teaming with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB), Sandia management, a Sandia risk assessment team, and Sandia waste management personnel. Specific lessons learned included the following: (1) potential efficiencies can be exploited by reprioritization and rescheduling of activities; (2) cost and schedule reductions can be realized by combining similar work at contiguous sites into a single effort; (3) working with regulators to develop preliminary remediation goals (PRGs) and gain regulatory acceptance for VCA planning prior to project initiation results in significant time savings throughout the remediation and permit modification processes; (4) effective and thoughtful contingency planning removes uncertainties and defrays costs so that projects can be completed without interruption; (5) timely collection of waste characterization samples allows efficient disposal of waste streams, and (6) concurrent reporting of VCA activities results in significant savings in time for the authors and reviewers

  17. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    Science.gov (United States)

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  18. CIRSE Vascular Closure Device Registry

    International Nuclear Information System (INIS)

    Reekers, Jim A.; Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2011-01-01

    Purpose: Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods: The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results: Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0–14.5] for antegrade access and 1.8% (95% CI 1.1–2.9) for retrograde access (P = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only 5.9 cm, and two vessel occlusions. Conclusion: The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters.

  19. 40 CFR 267.143 - Financial assurance for closure.

    Science.gov (United States)

    2010-07-01

    ...), utilizing the certificate of insurance for closure specified at 40 CFR 264.151(e). (f) Corporate financial... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Financial assurance for closure. 267... PERMIT Financial Requirements § 267.143 Financial assurance for closure. The owner or operator must...

  20. Tubular closure mechanism

    International Nuclear Information System (INIS)

    Kalen, D.D.; Mitchem, J.W.

    1982-01-01

    This invention relates to a closure mechanism for tubular irradiation surveillance specimen assembly holder used in nuclear reactors. The closure mechanism is composed of a latching member which includes a generally circular chamber with a plurality of elongated latches depending therefrom. The latching member circumscribes part of an actuator member which is disposed within the latching member so as to be axially movable. The axial movement of the actuator actuates positioning of the latches between positions in which the latches are locked and secured within the actuator member. Means, capable of being remotely manipulated, are provided to move the actuator in order to position the latches and load the articles within the tube

  1. Design and analysis of PCRV core cavity closure

    International Nuclear Information System (INIS)

    Lee, T.T.; Schwartz, A.A.; Koopman, D.C.A.

    1980-05-01

    Design requirements and considerations for a core cavity closure which led to the choice of a concrete closure with a toggle hold-down as the design for the Gas-Cooled Fast Breeder Reactor (GCFR) plant are discussed. A procedure for preliminary stress analysis of the closure by means of a three-dimensional finite element method is described. A limited parametric study using this procedure indicates the adequacy of the present closure design and the significance of radial compression developed as a result of inclined support reaction

  2. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  3. Preserving Records, Knowledge and Memory over Decades lessons from the NEA RK and M Project

    International Nuclear Information System (INIS)

    Pescatore, Claudio

    2014-01-01

    The RK and M Project 'Preservation of records, knowledge and memory across generations' is tasked with assembling evidence, information and carrying out research that will help the member organizations identify and implement a strategic plan for providing useful information to future generations concerning the disposal of radioactive waste in geological formations. The recent ICRP guidance [1] is adamant on maintaining oversight of these facilities for as long as practicable, even after closure. One should not plan the end of oversight, but only plan against the potential loss of oversight. One of the means to maintain oversight is to maintain records, knowledge and memory. In the case of long term storage, preservation of records, knowledge and memory is a key issue. Depending on the duration of long term storage there is an increasing probability that information relative to long term storage will be lost because of disruptions in society. This may result in a situation where the interim storage becomes a final disposal with inadequate safety features and therefore presents high risks to future generations. As part of its programme of work, the project has been seeking to gain insights on loss, misuse and also on recovery of records and knowledge from other areas than geological disposal. To this effect, a recent study under completion examines past experiences in the field of hazardous waste disposal. The final report should be available in Autumn 2013. This paper presents an overview of that study and its findings. (author)

  4. 40 CFR 265.280 - Closure and post-closure.

    Science.gov (United States)

    2010-07-01

    ... contaminants caused by wind erosion; and (4) Compliance with § 265.276 concerning the growth of food-chain... and post-closure care objectives of paragraph (a) of this section: (1) Type and amount of hazardous..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and...

  5. Airport Movement Area Closure Planner, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR research develops an automation tool improving temporary and permanent runway closure management. The Movement Area Closure Planner (MACP) provides airport...

  6. PUREX/UO3 facilities deactivation lessons learned history

    International Nuclear Information System (INIS)

    Gerber, M.S.

    1997-01-01

    In May 1997, a historic deactivation project at the PUREX (Plutonium URanium EXtraction) facility at the Hanford Site in south-central Washington State concluded its activities (Figure ES-1). The project work was finished at $78 million under its original budget of $222.5 million, and 16 months ahead of schedule. Closely watched throughout the US Department of Energy (DOE) complex and by the US Department of Defense for the value of its lessons learned, the PUREX Deactivation Project has become the national model for the safe transition of contaminated facilities to shut down status

  7. Fostering sustainable small-scale investments: lessons from experience and ideas for intervention and innovation

    International Nuclear Information System (INIS)

    Lucia, R.J. de

    2000-01-01

    This article presents lessons from experience pertinent to implementing small-scale natural resource and related investment projects in developing countries. It outlines ideas for intervention and innovation to foster such investments. Particular emphasis is placed on private-sector participation in these investments. Following a brief presentation of the economic development and other arguments that support intervention and innovation in support of such small-scale natural resource investments, the article discusses many of the lessons learned from experience. These lessons reinforce those touched upon in the investment-specific discussions in the previous articles. The experience and associated lessons that are examined include experiences in both developing and developed countries and encompass nor just lessons from natural resource investments, but also small-scale investments in other sectors. Financing and other innovations which facilitate meeting the challenges are drawn from relevant experience where barriers to investment have been surmounted. Options for programme and project interventions to increase market penetration of small-scale investments and achieve the associated development linkages and synergies are suggested. These suggestions are aimed especially at governments and bilateral and multilateral development finance and development assistance entities. It is those players who might support such interventions in collaboration with local financial institutions and other market players. (author)

  8. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  9. Lessons learned from existing biomass power plants

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, G.

    2000-02-24

    This report includes summary information on 20 biomass power plants, which represent some of the leaders in the industry. In each category an effort is made to identify plants that illustrate particular points. The project experiences described capture some important lessons learned that lead in the direction of an improved biomass power industry.

  10. Left ventricular remodeling and change of systolic function after closure of patent ductus arteriosus in adults: device and surgical closure.

    Science.gov (United States)

    Jeong, Young-Hoon; Yun, Tae-Jin; Song, Jong-Min; Park, Jung-Jun; Seo, Dong-Man; Koh, Jae-Kon; Lee, Se-Whan; Kim, Mi-Jeong; Kang, Duk-Hyun; Song, Jae-Kwan

    2007-09-01

    Left ventricular (LV) remodeling and predictors of LV systolic function late after closure of patent ductus arteriosus (PDA) in adults remain to be clearly demonstrated. In 45 patients with PDA, including 28 patients who received successful occlusion using the Amplatzer device (AD group) (AGA, Golden Valley, MN) and 17 patients who received surgical closure (OP group), echocardiography studies were performed before closure and 1 day (AD group) or within 7 days (OP group) after closure, and then were repeated at > or = 6 months (17 +/- 13 months). In both groups, LV ejection fraction (EF) and end-diastolic volume index were significantly decreased immediately after closure, whereas end-systolic volume index did not change. During the long-term follow-up period, end-systolic as well as end-diastolic volume indices decreased significantly in both groups and LV EF recovered compared to the immediate postclosure state. However, LV EF remained low compared to the preclosure state. Five patients (11.1%) including 3 patients in the AD group and 2 patients in the OP group showed persistent late LV systolic dysfunction (EF or = 62% had a sensitivity of 72% and a specificity of 83% for predicting late normal LV EF after closure. Left ventricular EF remains low late after PDA closure compared with preclosure state in adults. Preclosure LV EF is the best index to predict late postclosure LV EF.

  11. The Dynamics of Project-Based Learning Extension Courses: The "Laboratory of Social Projects" Case Study

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto

    2017-01-01

    In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, "Laboratory of Social Projects." The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of…

  12. Single-site neural tube closure in human embryos revisited.

    Science.gov (United States)

    de Bakker, Bernadette S; Driessen, Stan; Boukens, Bastiaan J D; van den Hoff, Maurice J B; Oostra, Roelof-Jan

    2017-10-01

    Since the multi-site closure theory was first proposed in 1991 as explanation for the preferential localizations of neural tube defects, the closure of the neural tube has been debated. Although the multi-site closure theory is much cited in clinical literature, single-site closure is most apparent in literature concerning embryology. Inspired by Victor Hamburgers (1900-2001) statement that "our real teacher has been and still is the embryo, who is, incidentally, the only teacher who is always right", we decided to critically review both theories of neural tube closure. To verify the theories of closure, we studied serial histological sections of 10 mouse embryos between 8.5 and 9.5 days of gestation and 18 human embryos of the Carnegie collection between Carnegie stage 9 (19-21 days) and 13 (28-32 days). Neural tube closure was histologically defined by the neuroepithelial remodeling of the two adjoining neural fold tips in the midline. We did not observe multiple fusion sites in neither mouse nor human embryos. A meta-analysis of case reports on neural tube defects showed that defects can occur at any level of the neural axis. Our data indicate that the human neural tube fuses at a single site and, therefore, we propose to reinstate the single-site closure theory for neural tube closure. We showed that neural tube defects are not restricted to a specific location, thereby refuting the reasoning underlying the multi-site closure theory. Clin. Anat. 30:988-999, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  13. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on the various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed {approx}5.5 years ahead of schedule and {approx}$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team.

  14. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    International Nuclear Information System (INIS)

    Lewis, BE

    2003-01-01

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and ∼420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on the various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed ∼5.5 years ahead of schedule and ∼$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team

  15. Moment Closure for the Stochastic Logistic Model

    National Research Council Canada - National Science Library

    Singh, Abhyudai; Hespanha, Joao P

    2006-01-01

    ..., which we refer to as the moment closure function. In this paper, a systematic procedure for constructing moment closure functions of arbitrary order is presented for the stochastic logistic model...

  16. Barriers and post-closure monitoring (AL121125)

    International Nuclear Information System (INIS)

    Bostick, K.V.; Janecky, D.

    1995-01-01

    This project focuses on the rapid implementation of near-surface barriers, biotreatment, and post-closure monitoring technology. It uses water-permeable and biologic barriers that chemically capture and/or degrade contaminants without significantly altering the natural water flow regime. Barrier approaches are being tested for two different applications. The first is the use of barriers for confinement of chemical contaminants for in-trench treatments with leach systems or an in-place bioreactor. The second is an enhancement of the current practice of emplacing grout or clay slurry walls into direct horizontal surface and subsurface water flows around a contaminated area by integrating permeable reactive barriers and petroleum reservoir gel/foam/polymer technology

  17. Engineered covers for mud pit closures Central Nevada Test Area, Nevada

    International Nuclear Information System (INIS)

    Madsen, D.D.

    2000-01-01

    Two abandoned drilling mud pits impacted with petroleum hydrocarbons were determined to require closure action at the Central Nevada Test Area. The UC-4 Mud Pit C is approximately 0.12 hectares (0.3 acres) and 1.2 meters (4 feet) in depth. The UC-1 Central Mud Pit (CMP) is approximately 1.54 hectares (3.8 acres) and 2.4 meters (8 feet) in depth. Both mud pits contain bentonite drilling muds with a thin dry crust, low shear strength, low permeability, and high moisture content. The following closure methodologies were evaluated: stabilization by mixing/injection with soil, fly ash, and lime; excavation and disposal; on-site drying; thermal destruction; wick drains; administrative closure (postings and land-use restrictions); and engineered covers. Based upon regulatory closure criteria, implementation, and cost considerations, the selected remedial alternative was the construction of an engineered cover. A multilayered cover with a geo-grid and geo-synthetic clay liner (GCL) was designed and constructed over the UC-4 Mud Pit C to evaluate the constructability and applicability of the design for the CMP cover. The geo-grid provided structural strength for equipment and material loads during cover construction, and the GCL was used as a moisture infiltration barrier. The design was determined to be constructable and applicable. To reduce project costs for the CMP cover, a vegetative cover was designed with drainage toward the center of the cover rather than the perimeter. The vegetative cover with the internal drainage design resulted in a fill volume reduction of approximately 63 percent compared to the multilayered cover design with a GCL

  18. Comparison of cost-effectiveness and postoperative outcome of device closure and open surgery closure techniques for treatment of patent ductus arteriosus.

    Science.gov (United States)

    Ahmadi, Alireza; Sabri, Mohammadreza; Bigdelian, Hamid; Dehghan, Bahar; Gharipour, Mojgan

    2014-01-01

    Various devices have been recently employed for percutaneous closure of the patent ductus arteriosus (PDA). Although the high effectiveness of device closure techniques has been clearly determined, a few studies have focused on the cost-effectiveness and also postoperative complications of these procedures in comparison with open surgery. The present study aimed to evaluate the clinical outcome and cost-effectiveness of PDA occlusion by Amplatzer and coil device in comparisong with open surgery. In this cross-sectional study, a randomized sample of 201 patients aged 1 month to 16 years (105 patients with device closure and 96 patients with surgical closure) was selected. The ratio of total pulmonary blood flow to total systemic blood flow, the Qp/Qs ratio, was measured using a pulmonary artery catheter. The cost analysis included direct medical care costs associated with device implantation and open surgery, as well as professional fees. All costs were calculated in Iranian Rials and then converted to US dollars. There was no statistical difference in mean Qp/Qs ratio before the procedure between the device closure group and the open surgery group (2.1 ± 0.7 versus 1.7 ± 0.6, P = 0.090). The mean measured costs were overall higher in the device closure group than in open closure group (948.87 ± 548.76 US$ versus 743.70 ± 696.91 US$, P gender (Standardized Beta = 0.160, P = 0.031). PDA closure with the Amplatzer ductal occluder (1053.05 ± 525.73 US$) or with Nit-Occlud coils (PFM) (912.73 ± 565.94 US$, P < 0.001) was more expensive than that via open surgery. However, the Cook detachable spring coils device closure (605.65 ± 194.62 US$, P = 0.650) had a non-significant cost difference with open surgery. No event was observed in the device closure group regarding in-hospital mortality or morbidity; however, in another group, 2 in-hospital deaths occurred, two patients experienced pneumonia and seizure, and one suffered electrolyte abnormalities including

  19. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL and REGULATORY COLLABORATION

    International Nuclear Information System (INIS)

    JARAYSI, M.N.

    2007-01-01

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure

  20. Learning from Experience Case Studies of the Hyper-X Project

    Science.gov (United States)

    Peebles, Curtis

    2009-01-01

    The Hyper-X project (X-43A) provides a number of "lessons learned" which can be applied to other aerospace project. The specific areas examined were the selection of the goals of the Hyper-X. How the technical unknowns and assumptions were handled. The final lesson was the ambiguous nature of risk assessment, and how trying to remove a technical unknown can have unintended consequences.

  1. Mass extraction container closure integrity physical testing method development for parenteral container closure systems.

    Science.gov (United States)

    Yoon, Seung-Yil; Sagi, Hemi; Goldhammer, Craig; Li, Lei

    2012-01-01

    Container closure integrity (CCI) is a critical factor to ensure that product sterility is maintained over its entire shelf life. Assuring the CCI during container closure (C/C) system qualification, routine manufacturing and stability is important. FDA guidance also encourages industry to develop a CCI physical testing method in lieu of sterility testing in a stability program. A mass extraction system has been developed to check CCI for a variety of container closure systems such as vials, syringes, and cartridges. Various types of defects (e.g., glass micropipette, laser drill, wire) were created and used to demonstrate a detection limit. Leakage, detected as mass flow in this study, changes as a function of defect length and diameter. Therefore, the morphology of defects has been examined in detail with fluid theories. This study demonstrated that a mass extraction system was able to distinguish between intact samples and samples with 2 μm defects reliably when the defect was exposed to air, water, placebo, or drug product (3 mg/mL concentration) solution. Also, it has been verified that the method was robust, and capable of determining the acceptance limit using 3σ for syringes and 6σ for vials. Sterile products must maintain their sterility over their entire shelf life. Container closure systems such as those found in syringes and vials provide a seal between rubber and glass containers. This seal must be ensured to maintain product sterility. A mass extraction system has been developed to check container closure integrity for a variety of container closure systems such as vials, syringes, and cartridges. In order to demonstrate the method's capability, various types of defects (e.g., glass micropipette, laser drill, wire) were created in syringes and vials and were tested. This study demonstrated that a mass extraction system was able to distinguish between intact samples and samples with 2 μm defects reliably when the defect was exposed to air, water

  2. Radionuclide retardation project at GTS - An overview of lessons learned and ongoing experiments

    International Nuclear Information System (INIS)

    Moeri, A.

    2001-01-01

    The joint Nagra/JNC Radionuclide Migration Programme has now been ongoing for more than 15 years in Nagra's Grimsel Test Site (GTS). The main aim of the programme has been the direct testing of radionuclide transport models in as realistic a manner as possible. The understanding and modelling of both the processes and the structures influencing radionuclide transport/retardation in fractured granitic host rocks have matured as has the experimental technology, which has contributed to develop confidence in the applicability of the underlying research models in a repository performance assessment. In this paper, three in situ experiments which were carried out in a discrete granitic shear zone are briefly presented: The Migration Experiment (MI), the Excavation Experiment (EP) and the ongoing Colloid and Radionuclide Retardation Experiment (CRR). Each project expanded on the experimental experience and research results from the preceding experiment. MI provided a sound data base of in situ tracer breakthrough curves which was used to derive relevant transport parameters by inverse modelling in order to enhance the capability for predictive modelling of tracer transport in a granitic shear zone. The Excavation Project (EP) then focussed on the excavation of the dipole flow field in order to describe the flow paths within the shear zone dipole and the retardation behaviour of sorbing radionuclides that are relevant to post-closure safety. The ongoing CRR experiment actually investigates the influence of bentonite colloids on the radionuclide transport behaviour through a fractured granitic host rock. Again, the experience in planning and handling of complex tracer field experiments gained in the proceeding experiments will be availed. The methodology adopted for the geological and hydrological characterisation of water-conducting features and the simplification of this characterisation for modelling purposes proved to be indeed effective on the modelling of

  3. 105-DR Large Sodium Fire Facility closure activities evaluation report

    International Nuclear Information System (INIS)

    Adler, J.G.

    1996-01-01

    This report evaluates the closure activities at the 105-DR Large Sodium Fire Facility. The closure activities discussed include: the closure activities for the structures, equipment, soil, and gravel scrubber; decontamination methods; materials made available for recycling or reuse; and waste management. The evaluation compares these activities to the regulatory requirements and closure plan requirements. The report concludes that the areas identified in the closure plan can be clean closed

  4. Storage shaft definitive closure plug and method

    International Nuclear Information System (INIS)

    Dardaine, M.

    1992-01-01

    A definitive closure plug system for radioactive waste storage at any deepness, is presented. The inherent weight of the closure materials is used to set in the plug: these materials display an inclined sliding surface in such a way that when the closure material rests on a stable surface of the shaft storage materials, the relative sliding of the different materials tends to spread them towards the shaft internal wall so as to completely occlude the shaft

  5. Defining a risk-informed framework for whole-of-government lessons learned: A Canadian perspective.

    Science.gov (United States)

    Friesen, Shaye K; Kelsey, Shelley; Legere, J A Jim

    Lessons learned play an important role in emergency management (EM) and organizational agility. Virtually all aspects of EM can derive benefit from a lessons learned program. From major security events to exercises, exploiting and applying lessons learned and "best practices" is critical to organizational resilience and adaptiveness. A robust lessons learned process and methodology provides an evidence base with which to inform decisions, guide plans, strengthen mitigation strategies, and assist in developing tools for operations. The Canadian Safety and Security Program recently supported a project to define a comprehensive framework that would allow public safety and security partners to regularly share event response best practices, and prioritize recommendations originating from after action reviews. This framework consists of several inter-locking elements: a comprehensive literature review/environmental scan of international programs; a survey to collect data from end users and management; the development of a taxonomy for organizing and structuring information; a risk-informed methodology for selecting, prioritizing, and following through on recommendations; and standardized templates and tools for tracking recommendations and ensuring implementation. This article discusses the efforts of the project team, which provided "best practice" advice and analytical support to ensure that a systematic approach to lessons learned was taken by the federal community to improve prevention, preparedness, and response activities. It posits an approach by which one might design a systematic process for information sharing and event response coordination-an approach that will assist federal departments to institutionalize a cross-government lessons learned program.

  6. Japanese lesson study in mathematics its impact, diversity and potential for educational improvement

    CERN Document Server

    Isoda, Masami; Stephens, Max

    2007-01-01

    In Before It''s Too Late: A Report to the Nation from the National Commission on Mathematics and Science Teaching for the 21st Century (2000) in the US, the authors quote from James Stigler''s conclusions from various videotape research studies of mathematics teaching: "The key to long-term improvement [in teaching] is to figure out how to generate, accumulate, and share professional knowledge". Japanese Lesson Study has proved to be one successful means. This book supports the growing movement of lesson study to improve the quality of mathematics education from the original viewpoints of Japanese educators who have been engaging in lesson study in mathematics for professional development and curriculum implementation. This book also illustrates several projects related to lesson study in other countries.

  7. Pollution prevention program for new projects -- Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Lum, J. [Dept. of Energy, Washington, DC (United States)

    1993-03-01

    The purpose of this presentation is to relay the experience of the Office of New Production Reactors (NP) in developing and implementing its pollution prevention program. NP was established to plan, design, and construct a new safe and environmentally acceptable nuclear reactor capacity necessary to provide an assured supply of tritium to maintain the nation`s long-term deterrent capability. The Program offered the Department of Energy an opportunity to demonstrate its commitment to environmental protection via minimization of environmental releases; new design offers the best opportunity for pollution prevention. The NP pollution prevention program was never fully implemented because NP`s tritium production design activity was recovery terminated. The information in this paper represented lessons learned from the last three years of NP operation.

  8. Establishing community partnerships to support late-life anxiety research: lessons learned from the Calmer Life project.

    Science.gov (United States)

    Jameson, John Paul; Shrestha, Srijana; Escamilla, Monica; Clark, Sharonda; Wilson, Nancy; Kunik, Mark; Zeno, Darrell; Harris, Toi B; Peters, Alice; Varner, Ivory L; Scantlebury, Carolyn; Scott-Gurnell, Kathy; Stanley, Melinda

    2012-01-01

    This article outlines the development of the Calmer Life project, a partnership established between researchers and faith-based and social service organizations to examine the effectiveness of cognitive behavioral therapy (CBT) incorporating religious/spiritual components for older African Americans in low-income communities. The program was designed to bypass several barriers to delivery of CBT within the specified community; it allows multimodal delivery (in person or by telephone) that occurs outside traditional mental health settings through faith-based organizations and neighborhood community centers. It includes religion/spirituality as an element, dependent upon the preference of the participant, and is modular, so that people can select the skills they wish to learn. Established relationships within the community were built upon, and initial meetings were held in community settings, allowing feedback from community organizations. This ongoing program is functioning successfully and has strengthened relationships with community partners and facilitated increased availability of education and services in the community. The lessons learned in establishing these partnerships are outlined. The growth of effectiveness research for late-life anxiety treatments in underserved minority populations requires development of functional partnerships between academic institutions and community stakeholders, along with treatment modifications to effectively address barriers faced by these consumers. The Calmer Life project may serve as a model.

  9. Fabrication and closure development of nuclear waste containers for storage at the Yucca Mountain, Nevada repository

    International Nuclear Information System (INIS)

    Russell, E.W.; Nelson, T.A.; Domian, H.A.; LaCount, D.F.; Robitz, E.S.; Stein, K.O.

    1989-04-01

    US Congress and the President have determined that the Yucca Mountain site in Nevada is to be characterized to determine its suitability for construction of the first US high-level nuclear waste repository. Work in connection with this site is carried out within the Yucca Mountain Project (YMP). Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing, developing, and projecting the performance of the waste package for the permanent storage of high-level nuclear waste. Babcock ampersand Wilcox (B ampersand W) is involved with the YMP as a subcontractor to LLNL. B ampersand W's role is to recommend and demonstrate a method for fabricating the metallic waste container and a method for performing the final closure of the container after it has been filled with waste. Various fabrication and closure methods are under consideration for the production of containers. This paper presents progress to date in identifying and evaluating the candidate manufacturing processes. 2 refs., 1 fig., 7 tabs

  10. Emergency transfer tube closure and process for sealing transfer tube under emergency conditions

    International Nuclear Information System (INIS)

    Hardin, R.T. Jr.; Marshall, J.R.

    1987-01-01

    In a nuclear fuel reactor well that includes a transfer tube projecting outwardly from wall thereof, the transfer tube is described having a first closure assembly. The transfer tube has a circumferential flange extending outwardly laterally therefrom, an emergency transfer tube closure therefor comprising; a pair of elongated, vertically-extending U-shaped guides, one U-shaped guide disposed laterally on each side of the transfer tube, each of the U-shaped guides comprising a base and laterally extending flanges thereon, the U-shaped guides having their open ends facing each other, a closure plate, having a surface facing the circumferential flange greater in area than the area circumscribed by the outer circumference of the circumferential flange, vertically disposed the U-shaped guides, the closure plate normally being disposed in a vertical plane just slightly in front of the vertical plane of the circumferential flange, two pairs of rollers, one pair of which is rotatably mounted on each side of the closure plate adjacent the U-shaped guides, riding on the inner portion of each of the flanges of each of the U-shaped guides. Each of the U-shaped guides is provided with a pair of spatially disposed openings on a flange thereof adjacent the wall of the nuclear fuel reactor well, each of the pairs of openings being disposed on each of the U-shaped guides a distance equal to the distance between the center lines of the corresponding pair of rollers riding within the U-shaped guides, each of the openings being sufficiently large to receive a corresponding roller of the pairs of rollers in the U-shaped guides. The openings is shaped on the flanges of the U-shaped guides so that when the pairs of rollers are disposed therein, the face of the closure plate will be in sealing engagement with the circumferential flange of the transfer tube

  11. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  12. Closure development for high-level nuclear waste containers for the tuff repository; Phase 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Robitz, E.S. Jr.; McAninch, M.D. Jr.; Edmonds, D.P. [Babcock and Wilcox Co., Lynchburg, VA (USA). Nuclear Power Div.]|[Babcock and Wilcox Co., Alliance, OH (USA). Research and Development Div.

    1990-09-01

    This report summarizes Phase 1 activities for closure development of the high-level nuclear waste package task for the tuff repository. Work was conducted under U.S. Department of Energy (DOE) Contract 9172105, administered through the Lawrence Livermore National Laboratory (LLNL), as part of the Yucca Mountain Project (YMP), funded through the DOE Office of Civilian Radioactive Waste Management (OCRWM). The goal of this phase was to select five closure processes for further evaluation in later phases of the program. A decision tree methodology was utilized to perform an objective evaluation of 15 potential closure processes. Information was gathered via a literature survey, industrial contacts, and discussions with project team members, other experts in the field, and the LLNL waste package task staff. The five processes selected were friction welding, electron beam welding, laser beam welding, gas tungsten arc welding, and plasma arc welding. These are felt to represent the best combination of weldment material properties and process performance in a remote, radioactive environment. Conceptual designs have been generated for these processes to illustrate how they would be implemented in practice. Homopolar resistance welding was included in the Phase 1 analysis, and developments in this process will be monitored via literature in Phases 2 and 3. Work was conducted in accordance with the YMP Quality Assurance Program. 223 refs., 20 figs., 9 tabs.

  13. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  14. Laser peripheral iridoplasty for angle-closure.

    Science.gov (United States)

    Ng, Wai Siene; Ang, Ghee Soon; Azuara-Blanco, Augusto

    2012-02-15

    Angle-closure glaucoma is a leading cause of irreversible blindness in the world. Treatment is aimed at opening the anterior chamber angle and lowering the IOP with medical and/or surgical treatment (e.g. trabeculectomy, lens extraction). Laser iridotomy works by eliminating pupillary block and widens the anterior chamber angle in the majority of patients. When laser iridotomy fails to open the anterior chamber angle, laser iridoplasty may be recommended as one of the options in current standard treatment for angle-closure. Laser peripheral iridoplasty works by shrinking and pulling the peripheral iris tissue away from the trabecular meshwork. Laser peripheral iridoplasty can be used for crisis of acute angle-closure and also in non-acute situations.   To assess the effectiveness of laser peripheral iridoplasty in the treatment of narrow angles (i.e. primary angle-closure suspect), primary angle-closure (PAC) or primary angle-closure glaucoma (PACG) in non-acute situations when compared with any other intervention. In this review, angle-closure will refer to patients with narrow angles (PACs), PAC and PACG. We searched CENTRAL (which contains the Cochrane Eyes and Vision Group Trials Register) (The Cochrane Library 2011, Issue 12), MEDLINE (January 1950 to January 2012), EMBASE (January 1980 to January 2012), Latin American and Caribbean Literature on Health Sciences (LILACS) (January 1982 to January 2012), the metaRegister of Controlled Trials (mRCT) (www.controlled-trials.com), ClinicalTrials.gov (www.clinicaltrials.gov) and the WHO International Clinical Trials Registry Platform (ICTRP) (www.who.int/ictrp/search/en). There were no date or language restrictions in the electronic searches for trials. The electronic databases were last searched on 5 January 2012. We included only randomised controlled trials (RCTs) in this review. Patients with narrow angles, PAC or PACG were eligible. We excluded studies that included only patients with acute presentations

  15. The potential migration effect of rural hospital closures

    DEFF Research Database (Denmark)

    Sørensen, Jens Fyhn Lykke

    2008-01-01

    to out-migration, although the hypothetical way of questioning leaves uncertainty about the actual scale of out-migration. Child families appear to be the most likely out-migrants. Elderly people may be hardest hit by a hospital closure, being most reliant on health care and least inclined to move away.......Rural hospital closures are high on the current health care agenda in Denmark. One raised concern is that rural hospital closures may further decrease population numbers in rural areas, as closures may induce some residents to move away from affected areas, i.e. closer to health care services...

  16. 304 Concretion facility closure plan

    International Nuclear Information System (INIS)

    1990-04-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium Zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/Zircaloy-2 alloy, and Zircaloy-2 chips and fines were secured in concrete billets in the 304 Concretion Facility, located in the 300 Area. The beryllium/Zircaloy-2 alloy and Zircaloy-2 chips and fines are designated as low-level radioactive mixed waste (LLRMW) with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Concretion Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act of 1976 (RCRA). This closure plan presents a description of the facility, the history of materials and wastes managed, and the procedures that will be followed to close the 304 Concretion Facility (304 Facility). Clean closure of the 304 Facility is the proposed method for closure of the facility. Justification for this proposal is presented. 15 refs., 22 figs., 4 tabs

  17. CIRSE Vascular Closure Device Registry

    Science.gov (United States)

    Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2010-01-01

    Purpose Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0–14.5] for antegrade access and 1.8% (95% CI 1.1–2.9) for retrograde access (P = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only 5.9 cm, and two vessel occlusions. Conclusion The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters. PMID:20981425

  18. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  19. Assessment of consistent two-equation closure for forest flows

    DEFF Research Database (Denmark)

    Sogachev, Andrey; Cavar, Dalibor; Bechmann, Andreas

    of grid turbulence and wall-bounded flow, the closure suggested is also valid for homogeneous shear flows commonly observed inside tall vegetative canopies. The present work assess the plant drag closure by comparing results of two different CFD models against observations derived over the forested area...... and can be applied for any twoequation closure. Results derived by different CFD models with k-epsilon and k-omega closure are similar and in good comparison with observations. Overall, numerical results show that the closure performs well, opening new possibilities for application to tasks related...... to the atmospheric boundary layer—where it is important to adequately account for the influences of vegetation....

  20. Successes and challenges of north–south partnerships – key lessons from the African/Asian Regional Capacity Development projects

    Science.gov (United States)

    Färnman, Rosanna; Diwan, Vishal; Zwarenstein, Merrick; Atkins, Salla

    2016-01-01

    Introduction Increasing efforts are being made globally on capacity building. North–south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs) over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE) projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Design Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. Results The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north–south and south–south partnerships that evolved during the project were the main achievement. However, others found there to be a ‘north–south divide’ in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. Conclusion The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed appropriately for all partner

  1. Successes and challenges of north–south partnerships – key lessons from the African/Asian Regional Capacity Development projects

    Directory of Open Access Journals (Sweden)

    Rosanna Färnman

    2016-10-01

    Full Text Available Introduction: Increasing efforts are being made globally on capacity building. North–south research partnerships have contributed significantly to enhancing the research capacity in low- and middle-income countries (LMICs over the past few decades; however, a lack of skilled researchers to inform health policy development persists, particularly in LMICs. The EU FP7 funded African/Asian Regional Capacity Development (ARCADE projects were multi-partner consortia aimed to develop a new generation of highly trained researchers from universities across the globe, focusing on global health-related subjects: health systems and services research and research on social determinants of health. This article aims to outline the successes, challenges and lessons learned from the life course of the projects, focusing on the key outputs and experiences of developing and implementing these two projects together with sub-Saharan African, Asian and European institution partners. Design: Sixteen participants from 12 partner institutions were interviewed. The data were analysed using thematic content analysis, which resulted in four themes and three sub-categories. These data were complemented by a review of project reports. Results: The results indicated that the ARCADE projects have been successful in developing and delivering courses, and have reached over 920 postgraduate students. Some partners thought the north–south and south–south partnerships that evolved during the project were the main achievement. However, others found there to be a ‘north–south divide’ in certain aspects. Challenges included technical constraints and quality assurance. Additionally, adapting new teaching and learning methods into current university systems was challenging, combined with not being able to award students with credits for their degrees. Conclusion: The ARCADE projects were introduced as an innovative and ambitious project idea, although not designed

  2. Evaluation of Container Closure System Integrity for Frozen Storage Drug Products.

    Science.gov (United States)

    Nieto, Alejandra; Roehl, Holger; Brown, Helen; Nikoloff, Jonas; Adler, Michael; Mahler, Hanns-Christian

    2016-01-01

    Sometimes, drug product for parenteral administration is stored in a frozen state (e.g., -20 °C or -80 °C), particularly during early stages of development of some biotech molecules in order to provide sufficient stability. Shipment of frozen product could potentially be performed in the frozen state, yet possibly at different temperatures, for example, using dry ice (-80 °C). Container closure systems of drug products usually consist of a glass vial, rubber stopper, and an aluminum crimped cap. In the frozen state, the glass transition temperature (Tg) of commonly used rubber stoppers is between -55 and -65 °C. Below their Tg, rubber stoppers are known to lose their elastic properties and become brittle, and thus potentially fail to maintain container closure integrity in the frozen state. Leaks during frozen temperature storage and transportation are likely to be transient, yet, can possibly risk container closure integrity and lead to microbial contamination. After thawing, the rubber stopper is supposed to re-seal the container closure system. Given the transient nature of the possible impact on container closure integrity in the frozen state, typical container closure integrity testing methods (used at room temperature conditions) are unable to evaluate and thus confirm container closure integrity in the frozen state. Here we present the development of a novel method (thermal physical container closure integrity) for direct assessment of container closure integrity by a physical method (physical container closure integrity) at frozen conditions, using a modified He leakage test. In this study, different container closure systems were evaluated with regard to physical container closure integrity in the frozen state to assess the suitability of vial/stopper combinations and were compared to a gas headspace method. In summary, the thermal physical container closure integrity He leakage method was more sensitive in detecting physical container closure

  3. Considerations for closure of low-level radioactive waste engineered disposal facilities

    International Nuclear Information System (INIS)

    1992-01-01

    Proper stabilization and closure of low-level radioactive waste disposal facilities require detailed planning during the early stages of facility development. This report provides considerations for host States, compact regions, and unaffiliated States on stabilization and closure of engineered low-level radioactive waste and mixed waste disposal facilities. A time line for planning closure activities, which identifies closure considerations to be addressed during various stages of a facility's development, is presented. Current Federal regulatory requirements and guidance for closure and post-closure are outlined. Significant differences between host State and Federal closure requirements are identified. Design features used as stabilization measures that support closure, such as waste forms and containers, backfill materials, engineered barrier systems, and site drainage systems, are described. These design features are identified and evaluated in terms of how they promote long-term site stability by minimizing water infiltration, controlling subsidence and surface erosion, and deterring intrusion. Design and construction features critical to successful closure are presented for covers and site drainage. General considerations for stabilization and closure operations are introduced. The role of performance and environmental monitoring during closure is described

  4. Regionalization: A Story Map Lesson on Regions

    Science.gov (United States)

    Edmondson, Deborah

    2018-01-01

    This lesson introduces the concept of regionalization and types of regions. After a brief introductory activity, students explore a story map to learn the material. The teacher can project the story map on a screen for all students to follow or students may work individually on computers. Working individually will allow students to set their own…

  5. Tank closure reducing grout

    International Nuclear Information System (INIS)

    Caldwell, T.B.

    1997-01-01

    A reducing grout has been developed for closing high level waste tanks at the Savannah River Site in Aiken, South Carolina. The grout has a low redox potential, which minimizes the mobility of Sr 90 , the radionuclide with the highest dose potential after closure. The grout also has a high pH which reduces the solubility of the plutonium isotopes. The grout has a high compressive strength and low permeability, which enhances its ability to limit the migration of contaminants after closure. The grout was designed and tested by Construction Technology Laboratories, Inc. Placement methods were developed by the Savannah River Site personnel

  6. Antiretroviral therapy in a community clinic - early lessons from a ...

    African Journals Online (AJOL)

    Antiretroviral therapy in a community clinic - early lessons from a pilot project. ... The HIV Research Unit, University of Cape Town, supplied training and ... Attention must be given to the diagnosis of tuberculosis during screening and early ART ...

  7. A kinematic view of loop closure.

    Science.gov (United States)

    Coutsias, Evangelos A; Seok, Chaok; Jacobson, Matthew P; Dill, Ken A

    2004-03-01

    We consider the problem of loop closure, i.e., of finding the ensemble of possible backbone structures of a chain segment of a protein molecule that is geometrically consistent with preceding and following parts of the chain whose structures are given. We reduce this problem of determining the loop conformations of six torsions to finding the real roots of a 16th degree polynomial in one variable, based on the robotics literature on the kinematics of the equivalent rotator linkage in the most general case of oblique rotators. We provide a simple intuitive view and derivation of the polynomial for the case in which each of the three pair of torsional axes has a common point. Our method generalizes previous work on analytical loop closure in that the torsion angles need not be consecutive, and any rigid intervening segments are allowed between the free torsions. Our approach also allows for a small degree of flexibility in the bond angles and the peptide torsion angles; this substantially enlarges the space of solvable configurations as is demonstrated by an application of the method to the modeling of cyclic pentapeptides. We give further applications to two important problems. First, we show that this analytical loop closure algorithm can be efficiently combined with an existing loop-construction algorithm to sample loops longer than three residues. Second, we show that Monte Carlo minimization is made severalfold more efficient by employing the local moves generated by the loop closure algorithm, when applied to the global minimization of an eight-residue loop. Our loop closure algorithm is freely available at http://dillgroup. ucsf.edu/loop_closure/. Copyright 2004 Wiley Periodicals, Inc. J Comput Chem 25: 510-528, 2004

  8. Crack closure in near-threshold fatigue crack propagation in railway axle steel EA4T

    Czech Academy of Sciences Publication Activity Database

    Pokorný, Pavel; Vojtek, Tomáš; Náhlík, Luboš; Hutař, Pavel

    2017-01-01

    Roč. 185, NOV (2017), s. 2-19 ISSN 0013-7944 R&D Projects: GA MŠk(CZ) LQ1601 Institutional support: RVO:68081723 Keywords : Fatigue crack propagation * crack closure * EA4T * Railway axle Subject RIV: JL - Materials Fatigue, Friction Mechanics OBOR OECD: Audio engineering , reliability analysis Impact factor: 2.151, year: 2016

  9. Socket sclerosis--an obstacle for orthodontic space closure?

    Science.gov (United States)

    Baumgaertel, Sebastian

    2009-07-01

    Socket sclerosis is a rare reaction to tooth extraction resulting in high-density bone in the center of the alveolar process, where, under normal circumstances, cancellous bone is to be expected. In an adult orthodontic patient, routine extractions of the mandibular first permanent bicuspids were performed, resulting in socket sclerosis and unsuccessful orthodontic space closure. Orthodontic mini-implants were inserted to augment anchorage and aid in space closure. In the presence of socket sclerosis, conventional orthodontic mechanics failed to close the extraction spaces. However, with absolute anchorage in place, space closure occurred at a nearly normal rate. After treatment, no signs of socket sclerosis were discernible on the periapical radiographs. Socket sclerosis can be an obstacle for orthodontic space closure if traditional mechanics are employed. However, mini-implant-reinforced anchorage can lead to successful space closure, resulting in complete resolution of the sclerotic sites.

  10. Primary closure of equine laryngotomy incisions

    DEFF Research Database (Denmark)

    Lindegaard, C.; Karlsson, L.; Ekstrøm, Claus Thorn

    2016-01-01

    incision between January 1995 and June 2012 were reviewed. Horses with a laryngotomy incision closed in three layers for primary healing were included. Descriptive data on healing characteristics and complications of laryngotomy wounds were collected from the medical records and via follow......The objective was to report healing characteristics and complications after primary closure of equine laryngotomies and analyse factors potentially associated with complications. This retrospective case series of the medical records of horses (n = 180) undergoing laryngoplasty and laryngotomy...... after primary closure of equine laryngotomy incisions are infrequent and considered of minimal severity and can be performed safely when paying careful attention to the closure of the cricothyroid membrane....

  11. Detailed design report for an operational phase panel-closure system

    International Nuclear Information System (INIS)

    1996-01-01

    Under contract to Westinghouse Electric Corporation (Westinghouse), Waste Isolation Division (WID), IT Corporation has prepared a detailed design of a panel-closure system for the Waste Isolation Pilot Plant (WIPP). Preparation of this detailed design of an operational-phase closure system is required to support a Resource Conservation and Recovery Act (RCRA) Part B permit application and a non-migration variance petition. This report describes the detailed design for a panel-closure system specific to the WIPP site. The recommended panel-closure system will adequately isolate the waste-emplacement panels for at least 35 years. This report provides detailed design and material engineering specifications for the construction, emplacement, and interface-grouting associated with a panel-closure system at the WIPP repository, which would ensure that an effective panel-closure system is in place for at least 35 years. The panel-closure system provides assurance that the limit for the migration of volatile organic compounds (VOC) will be met at the point of compliance, the WIPP site boundary. This assurance is obtained through the inherent flexibility of the panel-closure system

  12. Field test of a post-closure radiation monitor

    International Nuclear Information System (INIS)

    Reed, S.; Christy, C.E.; Heath, R.E.

    1995-01-01

    The DOE is conducting remedial actions at many sites contaminated with radioactive materials. After closure of these sites, long-term subsurface monitoring is typically required by law. This monitoring is generally labor intensive and expensive using conventional sampling and analysis techniques. The U.S. Department of Energy's Morgantown Energy Technology Center (METC) has contracted with Babcock and Wilcox to develop a Long-Term Post-Closure Radiation Monitoring System (LPRMS) to reduce these monitoring costs. A prototype LPRMS probe was built, and B ampersand W and FERMCO field tested this monitoring probe at the Fernald Environmental Management Project in the fall of 1994 with funding from the DOE's Office of Technology Development (EM-50) through METC. The system was used to measure soil and water with known uranium contamination levels, both in drums and in situ at depths up to 3 meters. For comparison purposes, measurements were also performed using a more conventional survey probe with a sodium iodide scintillator directly butt-coupled to detection electronics. This paper presents a description and the results of the field tests. The results were used to characterize the lower detection limits, precision and bias of the system, which allowed the DOE to judge the monitoring system's ability to meet its long-term post-closure radiation monitoring needs. Based on the test results, the monitoring system has been redesigned for fabrication and testing in a potential Phase III of this program. If the DOE feels that this system can meet its needs and chooses to continue into Phase III of this program, this redesigned full scale prototype system will be built and tested for a period of approximately a year. Such a system can be used at a variety of radioactively contaminated sites

  13. Percutaneous Transcatheter PDA Device Closure in Infancy

    International Nuclear Information System (INIS)

    Ullah, M.; Sultan, M.; Akhtar, K.; Sadiq, N.; Akbar, H.

    2014-01-01

    Objective: To evaluate the results and complications associated with transcatheter closure of patent ductus arteriosus (PDA) in infants. Study Design: Quasi-experimental study. Place and Duration of Study: Paediatric Cardiology Department of Armed Forces Institute of Cardiology / National Institute of Heart Diseases (AFIC/NIHD), Rawalpindi, from December 2010 to June 2012. Methodology: Infants undergoing transcatheter device closure of PDA were included. All patients were evaluated by experienced Paediatric Cardiologists with 2-D echocardiography and Doppler before the procedure. Success of closure and complications were recorded. Results: The age of patients varied from 05 - 12 months and 31 (56.4%) were females. Out of the 55 infants, 3 (5.4%) were not offered device closure after aortogram (two large tubular type ducts and one tiny duct, considered unsuitable for device closure); while in 50 (96.1%) patients out of remaining 52, the duct was successfully closed with transcatheter PDA device or coil. In one infant, device deployment resulted in acquired coarctation, necessitating device retrieval by Snare followed by surgical duct interruption and another patient had non-fatal cardiac arrest during device deployment leading to abandonment of procedure and subsequent successful surgical interruption. Local vascular complications occurred in 12 (21.8%) of cases and all were satisfactorily treated. Conclusion: Transcatheter device closure of PDA in infants was an effective procedure in the majority of cases; however, here were considerable number of local access site vascular complications. (author)

  14. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references

  15. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.

  16. ASSESSMENT OF LENS THICKNESS IN ANGLE CLOSURE DISEASE

    Directory of Open Access Journals (Sweden)

    Nishat Sultana Khayoom

    2016-08-01

    Full Text Available BACKGROUND Anterior chamber depth and lens thickness have been considered as important biometric determinants in primary angle-closure glaucoma. Patients with primary narrow angle may be classified as a primary angle closure suspect (PACS, or as having primary angle closure (PAC or primary angle closure glaucoma (PACG. 23.9% of patients with primary angle closure disease are in India, which highlights the importance of understanding the disease, its natural history, and its underlying pathophysiology, so that we may try to establish effective methods of treatment and preventative measures to delay, or even arrest, disease progression, thereby reducing visual morbidity. AIM To determine the lens thickness using A-scan biometry and its significance in various stages of angle closure disease. MATERIALS AND METHODS Patients attending outpatient department at Minto Ophthalmic Hospital between October 2013 to May 2015 were screened for angle closure disease and subsequently evaluated at glaucoma department. In our study, lens thickness showed a direct correlation with shallowing of the anterior chamber by determining the LT/ ACD ratio. A decrease in anterior chamber depth is proportional to the narrowing of the angle which contributes to the progression of the angle closure disease from just apposition to occlusion enhancing the risk for optic nerve damage and visual field loss. Hence, if the lens thickness values are assessed earlier in the disease process, appropriate intervention can be planned. CONCLUSION Determination of lens changes along with anterior chamber depth and axial length morphometrically can aid in early detection of angle closure. The role of lens extraction for PACG is a subject of increased interest. Lens extraction promotes the benefits of anatomical opening of the angle, IOP reduction and improved vision. This potential intervention may be one among the armamentarium of approaches for PACG. Among the current treatment modalities

  17. Transcatheter closure of patent ductus arteriosus: past, present and future.

    Science.gov (United States)

    Baruteau, Alban-Elouen; Hascoët, Sébastien; Baruteau, Julien; Boudjemline, Younes; Lambert, Virginie; Angel, Claude-Yves; Belli, Emre; Petit, Jérôme; Pass, Robert

    2014-02-01

    This review aims to describe the past history, present techniques and future directions in transcatheter treatment of patent ductus arteriosus (PDA). Transcatheter PDA closure is the standard of care in most cases and PDA closure is indicated in any patient with signs of left ventricular volume overload due to a ductus. In cases of left-to-right PDA with severe pulmonary arterial hypertension, closure may be performed under specific conditions. The management of clinically silent or very tiny PDAs remains highly controversial. Techniques have evolved and the transcatheter approach to PDA closure is now feasible and safe with current devices. Coils and the Amplatzer Duct Occluder are used most frequently for PDA closure worldwide, with a high occlusion rate and few complications. Transcatheter PDA closure in preterm or low-bodyweight infants remains a highly challenging procedure and further device and catheter design development is indicated before transcatheter closure is the treatment of choice in this delicate patient population. The evolution of transcatheter PDA closure from just 40 years ago with 18F sheaths to device delivery via a 3F sheath is remarkable and it is anticipated that further improvements will result in better safety and efficacy of transcatheter PDA closure techniques. Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  18. Patent foramen ovale closure using a bioabsorbable closure device: safety and efficacy at 6-month follow-up.

    Science.gov (United States)

    Van den Branden, Ben J; Post, Martijn C; Plokker, Herbert W; ten Berg, Jurriën M; Suttorp, Maarten J

    2010-09-01

    The aim of this study was to assess the mid-term safety and efficacy of percutaneous patent foramen ovale (PFO) closure using a bioabsorbable device (BioSTAR, NMT Medical, Boston, Massachusetts). Closure of PFO in patients with cryptogenic stroke has proven to be safe and effective using different types of permanent devices. All consecutive patients who underwent percutaneous PFO closure with the bioabsorbable closure device between November 2007 and January 2009 were included. Residual shunt was assessed using contrast transthoracic echocardiography. Sixty-two patients (55% women, mean age 47.7 ± 11.8 years) underwent PFO closure. The in-hospital complications were a surgical device retrieval in 2 patients (3.2%), device reposition in 1 (1.6%), and a minimal groin hematoma in 6 patients (9.7%). The short-term complications at 1-month follow-up (n = 60) were a transient ischemic attack in the presence of a residual shunt in 1 patient and new supraventricular tachycardia in 7 patients (11.3%). At 6-month follow-up (n = 60), 1 patient without residual shunt developed a transient ischemic attack and 1 developed atrial fibrillation. A mild or moderate residual shunt was noted in 51.7%, 33.9%, and 23.7% after 1-day, 1-month, and 6-month follow-up, respectively. A large shunt was present in 8.3%, 3.4%, and 0% after 1-day, 1-month, and 6-month follow-up. Closure of PFO using the bioabsorbable device is associated with a low complication rate and a low recurrence rate of embolic events. However, a relatively high percentage of mild or moderate residual shunting is still present at 6-month follow-up. Copyright © 2010 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

  19. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  20. PUREX/UO{sub 3} facilities deactivation lessons learned: History

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1997-11-25

    In May 1997, a historic deactivation project at the PUREX (Plutonium URanium EXtraction) facility at the Hanford Site in south-central Washington State concluded its activities (Figure ES-1). The project work was finished at $78 million under its original budget of $222.5 million, and 16 months ahead of schedule. Closely watched throughout the US Department of Energy (DOE) complex and by the US Department of Defense for the value of its lessons learned, the PUREX Deactivation Project has become the national model for the safe transition of contaminated facilities to shut down status.

  1. Fabrication and closure development of corrosion resistant containers for Nevada's Yucca Mountain high-level nuclear waste repository

    International Nuclear Information System (INIS)

    Russell, E.W.; Nelson, T.A.; Domian, H.A.; LaCount, D.F.; Robitz, E.S.; Stein, K.O.

    1989-11-01

    US Congress and the President have determined that the Yucca Mountain site in Nevada is to be characterized to determine its suitability for construction of the first US high-level nuclear waste repository. Work in connection with this site is carried out within the Yucca Mountain Project (YMP). Lawrence Livermore National Laboratory (LLNL) has the responsibility for designing, developing, and projecting the performance of the waste package for the permanent storage of high-level nuclear waste. Babcock ampersand Wilcox (B ampersand W) is involved with the YMP as a subcontractor to LLNL. B ampersand W's role is to recommend and demonstrate a method for fabricating the metallic waste container and a method for performing the final closure of the container after it has been filled with waste. Various fabrication and closure methods are under consideration for the production of containers. This paper presents progress to date in identifying and evaluating the candidate manufacturing processes. 2 refs., 2 figs., 4 tabs

  2. Consideration of timescales in post-closure safety of geological disposal of radioactive waste

    International Nuclear Information System (INIS)

    2006-11-01

    by a number of general considerations, which are described first. Three broad areas in the regulation and practice of repository planning and implementation affected by timescales issues are then discussed: - repository siting and design and the levels of protection required in regulation; - the planning of pre- and post-closure actions; and - developing and presenting a safety case. Finally, a synthesis of findings is made, including a review of the statements made in the 2004 'lessons learnt' report in light of the discussions contained in the present report. Many of the issues treated in the course of the project are subject to various interpretations, and remain under discussion in national programmes, as well as internationally. Therefore, the findings in this report should not be viewed as conclusive, but rather as a contribution in moving ahead the debate and understanding the similarities and differences among approaches in national programmes. (authors)

  3. Emergent properties during dorsal closure in Drosophila morphogenesis

    International Nuclear Information System (INIS)

    Peralta, X G; Toyama, Y; Edwards, G S; Kiehart, D P

    2008-01-01

    Dorsal closure is an essential stage of Drosophila development that is a model system for research in morphogenesis and biological physics. Dorsal closure involves an orchestrated interplay between gene expression and cell activities that produce shape changes, exert forces and mediate tissue dynamics. We investigate the dynamics of dorsal closure based on confocal microscopic measurements of cell shortening in living embryos. During the mid-stages of dorsal closure we find that there are fluctuations in the width of the leading edge cells but the time-averaged analysis of measurements indicate that there is essentially no net shortening of cells in the bulk of the leading edge, that contraction predominantly occurs at the canthi as part of the process for zipping together the two leading edges of epidermis and that the rate constant for zipping correlates with the rate of movement of the leading edges. We characterize emergent properties that regulate dorsal closure, i.e., a velocity governor and the coordination and synchronization of tissue dynamics

  4. Community Learning Campus: It Takes a Simple Message to Build a Complex Project

    Science.gov (United States)

    Pearson, George

    2012-01-01

    Education Canada asked Tom Thompson, president of Olds College and a prime mover behind the Community Learning Campus (CLC): What were the lessons learned from this unusually ambitious education project? Thompson mentions six lessons he learned from this complex project which include: (1) Dream big, build small, act now; (2) Keep a low profile at…

  5. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  6. Oskarshamn 1-project FENIX

    International Nuclear Information System (INIS)

    Sjoeqvist, N.G.

    1994-01-01

    This paper summarizes the actions to be taken in a large re-start and backfitting project such as the Fenix project. It describes the organization, planning and financial management, safety criteria and licensing procedures, safety concept report, health and safety. The results from the unique full system decontamination of the reactor pressure vessel is described. The project is still ongoing and therefore other results and lessons learnt are not reported. (author) 9 figs

  7. Public private partnership construction project disputes in Nigeria ...

    African Journals Online (AJOL)

    This research examines the possibility of operating a smooth Public Private Partnership (PPP) project for the entire concession period following financial closure, without recourse to litigation or arbitration for settlement of disputes by studying the causes and effects of disputes in construction projects procured in Nigeria ...

  8. Economic evaluation of closure cap barrier materials study

    Energy Technology Data Exchange (ETDEWEB)

    Serrato, M.G.; Bhutani, J.S.; Mead, S.M.

    1993-09-01

    Volume II of the Economic Evaluation of the Closure Cap Barrier Materials, Revision I contains detailed cost estimates for closure cap barrier materials. The cost estimates incorporate the life cycle costs for a generic hazardous waste seepage basin closure cap under the RCRA Post Closure Period of thirty years. The economic evaluation assessed six barrier material categories. Each of these categories consists of several composite cover system configurations, which were used to develop individual cost estimates. The information contained in this report is not intended to be used as a cost estimating manual. This information provides the decision makers with the ability to screen barrier materials, cover system configurations, and identify cost-effective materials for further consideration.

  9. Economic evaluation of closure cap barrier materials study

    International Nuclear Information System (INIS)

    Serrato, M.G.; Bhutani, J.S.; Mead, S.M.

    1993-09-01

    Volume II of the Economic Evaluation of the Closure Cap Barrier Materials, Revision I contains detailed cost estimates for closure cap barrier materials. The cost estimates incorporate the life cycle costs for a generic hazardous waste seepage basin closure cap under the RCRA Post Closure Period of thirty years. The economic evaluation assessed six barrier material categories. Each of these categories consists of several composite cover system configurations, which were used to develop individual cost estimates. The information contained in this report is not intended to be used as a cost estimating manual. This information provides the decision makers with the ability to screen barrier materials, cover system configurations, and identify cost-effective materials for further consideration

  10. Key financial ratios can foretell hospital closures.

    Science.gov (United States)

    Lynn, M L; Wertheim, P

    1993-11-01

    An analysis of various financial ratios sampled from open and closed hospitals shows that certain leverage, liquidity, capital efficiency, and resource availability ratios can predict hospital closure up to two years in advance of the closure with an accuracy of nearly 75 percent.

  11. Hospital closure: Phoenix, Hydra or Titanic?

    Science.gov (United States)

    Dunne, T; Davis, S

    1996-01-01

    Very little has been published about the effects of hospital closure in terms of the service, financial or management issues of the process. Attempts through a case-study format to redress the balance and as such represents the reflections of practitioners who have recently undergone the experience of hospital closure and the often neglected issues arising both during and after the process.

  12. Revising the Depreciation and Investment Credit Lessons for Farm Management and Supervised Occupational Experience for Use in Missouri Programs of Vocational Agriculture. Final Report.

    Science.gov (United States)

    Rohrbach, Norman; And Others

    This project developed four lessons that reflect the 1981 tax laws as they relate to the use of investment credit and depreciation in farm accounting systems. Project staff reviewed tax laws and related materials and identified four lessons in farm management and supervised occupational experience that needed revision. Materials were then…

  13. Simulating school closure policies for cost effective pandemic decision making

    Directory of Open Access Journals (Sweden)

    Araz Ozgur M

    2012-06-01

    Full Text Available Abstract Background Around the globe, school closures were used sporadically to mitigate the 2009 H1N1 influenza pandemic. However, such closures can detrimentally impact economic and social life. Methods Here, we couple a decision analytic approach with a mathematical model of influenza transmission to estimate the impact of school closures in terms of epidemiological and cost effectiveness. Our method assumes that the transmissibility and the severity of the disease are uncertain, and evaluates several closure and reopening strategies that cover a range of thresholds in school-aged prevalence (SAP and closure durations. Results Assuming a willingness to pay per quality adjusted life-year (QALY threshold equal to the US per capita GDP ($46,000, we found that the cost effectiveness of these strategies is highly dependent on the severity and on a willingness to pay per QALY. For severe pandemics, the preferred strategy couples the earliest closure trigger (0.5% SAP with the longest duration closure (24 weeks considered. For milder pandemics, the preferred strategies also involve the earliest closure trigger, but are shorter duration (12 weeks for low transmission rates and variable length for high transmission rates. Conclusions These findings highlight the importance of obtaining early estimates of pandemic severity and provide guidance to public health decision-makers for effectively tailoring school closures strategies in response to a newly emergent influenza pandemic.

  14. Potential socio-economic consequences of mine closure

    Directory of Open Access Journals (Sweden)

    Marietjie Ackermann

    2018-01-01

    Full Text Available Background: Mine closures generally reveal negligence on the part of mining houses, not only in terms of the environment, but also the surrounding mining communities. Aim: This article reflects on the findings of research into the socio-economic consequences of mine closure. The research specifically explored how mineworkers’ dependency on their employment at a mine affects their ability to sustain their livelihood. Setting: The research was conducted at the Orkney Mine and the Grootvlei Mine (Springs. Methods: The research was conducted within a naturalistic domain, guided by a relativist orientation, a constructivist ontology and an interpretivist epistemology. Data were collected by means of document analysis, semi-structured interviews, focus group discussion and unstructured observation. Results: From the research findings, it is evident that mine closures, in general, have a devastating effect on the surrounding mining communities as well as on the employees. Mine closures in the case studies gradually depleted the mining communities’ livelihood assets and resulted in the collapse of their coping strategies and livelihood outcomes. It generally affected the communities’ nutrition, health, education, food security, water, shelter, levels of community participation and personal safety. Conclusion: If not managed efficiently and effectively, mine closures may pose significant challenges to the mining industry, government, the environment, national and local economic prosperity and communities in the peripheral areas of mines. This truly amplifies that mine closure, whether temporary or permanent, is an issue that needs to be addressed with responsibility towards all stakeholders, including the mining community and the labour force.

  15. Top closure for control rod drive for nuclear reactor

    International Nuclear Information System (INIS)

    Raas, J.H.; Schwartz, J.I.

    1978-01-01

    A removable top closure and venting assembly for the tubular housing of a control rod drive includes a mounting ring threadably inserted in the upper end of the housing, a fluid-sealing closure member beneath the mounting ring and which is mounted in and coupled to the mounting ring by means of a ball and socket joint, a gas vent defined by interconnecting passages extending through the closure and through the ball and socket joint, and a vent valve accessible from the top of the closure assembly. 3 claims, 2 figures

  16. Transcatheter closure of ventricular septal defect with Occlutech Duct Occluder.

    Science.gov (United States)

    Atik-Ugan, Sezen; Saltik, Irfan Levent

    2018-04-01

    Patent ductus arteriosus occluders are used for transcatheter closure of ventricular septal defects, as well as for closure of patent ductus arteriosus. The Occlutech Duct Occluder is a newly introduced device for transcatheter closure of patent ductus arteriosus. Here, we present a case in which the Occlutech Duct Occluder was successfully used on a patient for the closure of a perimembraneous ventricular septal defect.

  17. Economics of forest and forest carbon projects. Translating lessons learned into national REDD+ implementation

    Energy Technology Data Exchange (ETDEWEB)

    Zaballa Romero, M.; Traerup, S.; Wieben, E.; Ravnkilde Moeller, L.; Koch, A.

    2013-01-15

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. The report is part of efforts to share financial experiences and lessons learned with policymakers, project developers and stakeholders, with the objective to inform forest project and strategy development. It presents experiences and advice on the risks, costs and revenues of forest projects, thereby informing not only the development of future REDD+ initiatives but also the testing of advanced market commitments as a finance option for sustainable forest management. The findings in the report underline the fact that only through sound and transparent financial information will forest projects and national forest initiatives become interesting for private financial institutions and comparable with other investment opportunities. It is therefore important to include robust analysis of the operations business case and its financial attractiveness to commercial investors, early in the design process. As for the economics of forest and forest carbon projects, it appears that REDD+ payments alone, especially at current prices, will not deliver the revenues that cover all expenses of transparent and long-term mitigation of forest carbon emissions. Instead the findings underline the importance of building up forest operations which effectively manages risk and delivers several revenue streams. These findings are aligned with the advocacy efforts of UNEP and the UN-REDD Programme on multiple benefits and the combination of various funding and

  18. Seven-year follow-up of percutaneous closure of patent foramen ovale.

    Science.gov (United States)

    Mirzada, Naqibullah; Ladenvall, Per; Hansson, Per-Olof; Johansson, Magnus Carl; Furenäs, Eva; Eriksson, Peter; Dellborg, Mikael

    2013-12-01

    Observational studies favor percutaneous closure of patent foramen ovale (PFO) over medical treatment to reduce recurrent stroke while randomized trials fail to demonstrate significant superiority of percutaneous PFO closure. Few long-term studies are available post PFO closure. This study reports long-term clinical outcomes after percutaneous PFO closure. Between 1997 and 2006, 86 consecutive eligible patients with cerebrovascular events, presumably related to PFO, underwent percutaneous PFO closure. All 86 patients were invited to a long-term follow-up, which was carried out during 2011 and 2012. Percutaneous PFO closure was successfully performed in 85 of 86 patients. The follow-up rate was 100%. No cardiovascular or cerebrovascular deaths occurred. Two patients (both women) died from lung cancer during follow-up. Follow-up visits were conducted for 64 patients and the remaining 20 patients were followed up by phone. The mean follow-up time was 7.3 years (5 to 12.4 years). Mean age at PFO closure was 49 years. One patient had a minor stroke one month after PFO closure and a transient ischemic attack (TIA) two years afterwards. One other patient suffered from a TIA six years after closure. No long-term device-related complications were observed. Percutaneous PFO closure was associated with very low risk of recurrent stroke and is suitable in most patients. We observed no mortality and no long-term device-related complications related to PFO closure, indicating that percutaneous PFO closure is a safe and efficient treatment even in the long term.

  19. Permanent Closure of the TAN-664 Underground Storage Tank

    Energy Technology Data Exchange (ETDEWEB)

    Bradley K. Griffith

    2011-12-01

    This closure package documents the site assessment and permanent closure of the TAN-664 gasoline underground storage tank in accordance with the regulatory requirements established in 40 CFR 280.71, 'Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.'

  20. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  1. Single-shell tank closure work plan. Revision A

    International Nuclear Information System (INIS)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs

  2. Social and macro economic impact of closure

    International Nuclear Information System (INIS)

    Medeliene, D.

    1999-01-01

    The social consequences of closure of Ignalina NPP will largely depend on the actions the Government takes. If it puts in place the conditions which enable the International Financial Institutions to assist Lithuania, both in providing loans and grants for decommissioning and (in the case of the EU) providing Structural Adjustment Funds for the regional economic development of the Visaginas area, then solutions to the problems of closure can be found. But if the Government delays putting into place the necessary conditions, then Lithuania will be left to solve the problems of - inter alia necessary - closure of Ignalina NPP on its own. (author)

  3. Angle closure glaucoma in congenital ectropion uvea

    Directory of Open Access Journals (Sweden)

    Grace M. Wang

    2018-06-01

    Full Text Available Purpose: Congenital ectropion uvea is a rare anomaly, which is associated with open, but dysplastic iridocorneal angles that cause childhood glaucoma. Herein, we present 3 cases of angle-closure glaucoma in children with congenital ectropion uvea. Observations: Three children were initially diagnosed with unilateral glaucoma secondary to congenital ectropion uvea at 7, 8 and 13 years of age. The three cases showed 360° of ectropion uvea and iris stromal atrophy in the affected eye. In one case, we have photographic documentation of progression to complete angle closure, which necessitated placement of a glaucoma drainage device 3 years after combined trabeculotomy and trabeculectomy. The 2 other cases, which presented as complete angle closure, also underwent glaucoma drainage device implantation. All three cases had early glaucoma drainage device encapsulation (within 4 months and required additional surgery (cycloablation or trabeculectomy. Conclusions and importance: Congenital ectropion uvea can be associated with angle-closure glaucoma, and placement of glaucoma drainage devices in all 3 of our cases showed early failure due to plate encapsulation. Glaucoma in congenital ectropion uvea requires attention to angle configuration and often requires multiple surgeries to obtain intraocular pressure control. Keywords: Congenital ectropion uvea, Juvenile glaucoma, Angle-closure glaucoma, Glaucoma drainage device

  4. Breathing Life into Engineering: A Lesson Study Life Science Lesson

    Science.gov (United States)

    Lawrence, Maria; Yang, Li-Ling; Briggs, May; Hession, Alicia; Koussa, Anita; Wagoner, Lisa

    2016-01-01

    A fifth grade life science lesson was implemented through a lesson study approach in two fifth grade classrooms. The research lesson was designed by a team of four elementary school teachers with the goal of emphasizing engineering practices consistent with the "Next Generation Science Standards" (NGSS) (Achieve Inc. 2013). The fifth…

  5. Home Kitchen Safety Lessons for Children and Adults

    OpenAIRE

    Wingfield, Amanda

    2014-01-01

    The purpose of this project was to design a series of lessons introducing food safety concepts and hand washing to children ages three to five, which is a group that is considered an ‘at risk’ population with food safety regards. There are other curriculum that reach this audience, but the intent of this one is to target stay-at-home mothers, whose children are not in preschool. The project goal is to teach the mother and child food safety concepts while simultaneously using hands on cooking ...

  6. Strategic Planning for Hot Cell Closure

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2001-01-01

    The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to be located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping, and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adequate attention to detail when the situation required contributed to the process credibility and a successful plan

  7. Subcostal closure technique for prevention of postthoracotomy pain syndrome.

    Science.gov (United States)

    Hong, Kipyo; Bae, Mikyung; Han, Sora

    2016-09-01

    The purpose of this study was to evaluate the efficacy of our subcostal closure technique in prevention of postthoracotomy pain syndrome. From July 2012 to March 2015, 29 patients in whom a lobectomy was indicated underwent a thoracotomy. The thoracotomy wounds were closed using a subcostal closure technique (subcostal closure group) and outcomes were compared with 31 patients who underwent video-assisted thoracoscopic surgery (thoracoscopy group). The duration of oral opioid consumption was evaluated from medical records, and postoperative pain was evaluated by telephone interview conducted by a trained nurse practitioner who was unaware of the patient's group. Pain scores were higher in the thoracoscopy group compared to the subcostal closure group, reaching statistical significance (Numeric Rating Scale 0.55 ± 0.948 in the subcostal closure group vs. 1.84 ± 1.614 in the thoracoscopy group; p Pain Scale 0.24 ± 0.435 in the subcostal closure group vs. 0.81 ± 0.703 in the thoracoscopy group; p pain syndrome. © The Author(s) 2016.

  8. Post-closure permit application for the Kerr Hollow Quarry at the Y-12 plant

    International Nuclear Information System (INIS)

    1995-06-01

    The Kerr Hollow Quarry (KHQ) is located on U.S. Department of Energy (DOE) property at the Y-12 Plant, Oak Ridge, Tennessee. The Oak Ridge Y-12 Plant was built by the U.S. Army Corps of Engineers in 1943 as part of the Manhattan Project. Until 1992, the primary mission of the Y-12 Plant was the production and fabrication of nuclear weapons components. Activities associated with these functions included production of lithium compounds, recovery of enriched uranium from scrap material, and fabrication of uranium and other materials into finished parts for assemblies. The Kerr Hollow Quarry was used for waste disposal of a variety of materials including water-reactive and shock-sensitive chemicals and compressed gas cylinders. These materials were packaged in various containers and sank under the water in the quarry due to their great weight. Disposal activities were terminated in November, 1988 due to a determination by the Tennessee Department of Environment and Conservation that the quarry was subject to regulations under the Resource Conservation and Recovery Act of 1993. Methods of closure for the quarry were reviewed, and actions were initiated to close the quarry in accordance with closure requirements for interim status surface impoundments specified in Tennessee Rules 1200-1-11-.05(7) and 1200-1-11-.05(11). As part of these actions, efforts were made to characterize the physical and chemical nature of wastes that had been disposed of in the quarry, and to remove any containers or debris that were put into the quarry during waste disposal activities. Closure certification reports (Fraser et al. 1993 and Dames and Moore 1993) document closure activities in detail. This report contains the post-closure permit application for the Kerr Hollow Quarry site

  9. Hexone Storage and Treatment Facility closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The HSTF is a storage and treatment unit subject to the requirements for the storage and treatment of dangerous waste. Closure is being conducted under interim status and will be completed pursuant to the requirements of Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and WAC 173-303-640. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. The known hazardous/dangerous waste remaining at the site before commencing other closure activities consists of the still vessels, a tarry sludge in the storage tanks, and residual contamination in equipment, piping, filters, etc. The treatment and removal of waste at the HSTF are closure activities as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and WAC 173-303

  10. Cyanoacrylate for Intraoral Wound Closure: A Possibility?

    Directory of Open Access Journals (Sweden)

    Parimala Sagar

    2015-01-01

    Full Text Available Wound closure is a part of any surgical procedure and the objective of laceration repair or incision closure is to approximate the edges of a wound so that natural healing process may occur. Over the years new biomaterials have been discovered as an alternate to conventional suture materials. Cyanoacrylate bioadhesives are one among them. They carry the advantages of rapid application, patient comfort, resistance to infection, hemostatic properties, and no suture removal anxiety. Hence this study was undertaken to study the effect of long chain cyanoacrylate as an adhesive for intraoral wound closure and also to explore its hemostatic and antibacterial effects. Isoamyl-2-cyanoacrylate (AMCRYLATE was used as the adhesive in the study. In conclusion isoamyl cyanoacrylate can be used for intraoral wound closure, as an alternative to sutures for gluing the mucoperiosteum to bone, for example, after impaction removal, periapical surgeries, and cleft repair. Its hemostatic and antibacterial activity has to be further evaluated.

  11. LEGO robot vehicle lesson plans for secondary education : a recruitment tool.

    Science.gov (United States)

    2012-08-01

    Robotics is a great way to get kids excited about science, technology, engineering, and math (STEM) topics. It is also highly effective in stimulation development of teamwork and self-confidence. This project provides transportation-related lesson pl...

  12. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  13. Lessons Learned from the USAID Girls' Education Activity in Guatemala, Morocco, and Peru.

    Science.gov (United States)

    Rugh, Andrea; Brush, Lorelei

    The Girls' Education Activity (GEA) is a project of the United States Agency for International Development's (USAID's) Office of Women in Development (WID) in the Bureau for Economic Growth, Agriculture and Trade. This report summarizes the experiences and lessons learned from 12 project initiatives in the 3 participating countries (Guatemala,…

  14. Design, production and initial state of the closure

    International Nuclear Information System (INIS)

    2010-12-01

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The production reports are included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the closure and plugs in underground openings other than deposition tunnels for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the engineered barriers once they have been finally placed in the KBS-3 repository and will not be further handled within the repository facility. In addition, the report provides some input to the operational safety report, SR-Operation, on how the closure and plugs shall be handled and installed. The report presents the design premises and reference designs of the closure and plugs and verifies their conformity to the design premises. It also briefly deals with the production of the closure and plugs. Finally, the initial state of the closure and plugs and their conformity to the reference designs and design premises are presented

  15. Design, production and initial state of the closure

    Energy Technology Data Exchange (ETDEWEB)

    2010-12-15

    The report is included in a set of Production reports, presenting how the KBS-3 repository is designed, produced and inspected. The production reports are included in the safety report for the KBS-3 repository and repository facility. The report provides input on the initial state of the closure and plugs in underground openings other than deposition tunnels for the assessment of the long-term safety, SR-Site. The initial state refers to the properties of the engineered barriers once they have been finally placed in the KBS-3 repository and will not be further handled within the repository facility. In addition, the report provides some input to the operational safety report, SR-Operation, on how the closure and plugs shall be handled and installed. The report presents the design premises and reference designs of the closure and plugs and verifies their conformity to the design premises. It also briefly deals with the production of the closure and plugs. Finally, the initial state of the closure and plugs and their conformity to the reference designs and design premises are presented

  16. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  17. Transcatheter Closure of Patent Foramen Ovale: Devices and Technique.

    Science.gov (United States)

    Price, Matthew J

    2017-10-01

    Transcatheter closure of a patent foramen ovale (PFO) reduces the risk of recurrent cryptogenic stroke compared with medical therapy. PFO closure is a prophylactic procedure, and will not provide the patient with symptomatic improvement, except in cases of hypoxemia due to right-to-left shunt or possibly migraine headaches. Therefore, appropriate patient selection is critical, and procedural safety is paramount. Herein, we review key characteristics of the devices currently available for transcatheter PFO closure within the United States, and highlight key technical aspects of the PFO closure procedure that will maximize procedural success. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Digital signal processing of data from borehole creep closure

    International Nuclear Information System (INIS)

    Chakrabarti, S.; Patrick, W.C.; Duplancic, N.

    1987-01-01

    Digital signal processing, a technique commonly used in the fields of electrical engineering and communication technology, has been successfully used to analyze creep closure data obtained from a 0.91 m diameter by 5.13 deep borehole in bedded salt. By filtering the ''noise'' component of the closure data from a test borehole, important data trends were made more evident and average creep closure rates were able to be calculated. This process provided accurate estimates of closure rates that are used in the design of lined boreholes in which heat-generating transuranic nuclear wastes are emplaced at the Waste Isolation Pilot Plant

  19. 40 CFR 264.119 - Post-closure notices.

    Science.gov (United States)

    2010-07-01

    ...) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Closure... closure of each hazardous waste disposal unit, the owner or operator must submit to the local zoning... disposal unit of the facility. For hazardous wastes disposed of before January 12, 1981, the owner or...

  20. A closure test for time-specific capture-recapture data

    Science.gov (United States)

    Stanley, T.R.; Burnham, K.P.

    1999-01-01

    The assumption of demographic closure in the analysis of capture-recapture data under closed-population models is of fundamental importance. Yet, little progress has been made in the development of omnibus tests of the closure assumption. We present a closure test for time-specific data that, in principle, tests the null hypothesis of closed-population model M(t) against the open-population Jolly-Seber model as a specific alternative. This test is chi-square, and can be decomposed into informative components that can be interpreted to determine the nature of closure violations. The test is most sensitive to permanent emigration and least sensitive to temporary emigration, and is of intermediate sensitivity to permanent or temporary immigration. This test is a versatile tool for testing the assumption of demographic closure in the analysis of capture-recapture data.

  1. Reliability in maintenance and design of elastomer sealed closures

    International Nuclear Information System (INIS)

    Lake, W.H.

    1978-01-01

    The methods of reliability are considered for maintenance and design of elastomer sealed containment closures. Component reliability is used to establish a replacement schedule for system maintenance. Reliability data on elastomer seals is used to evaluate the common practice of annual replacement, and to calculate component reliability values for several typical shipment time periods. System reliability methods are used to examine the relative merits of typical closure designs. These include single component and redundant seal closure, with and without closure verification testing. The paper presents a general method of quantifying the merits of closure designs through the use of reliability analysis, which is a probabilistic technique. The reference list offers a general source of information in the field of reliability, and should offer the opportunity to extend the procedures discussed in this paper to other design safety applications

  2. Lessons learned in applying function analysis

    International Nuclear Information System (INIS)

    Mitchel, G.R.; Davey, E.; Basso, R.

    2001-01-01

    This paper summarizes the lessons learned in undertaking and applying function analysis based on the recent experience of utility, AECL and international design and assessment projects. Function analysis is an analytical technique that can be used to characterize and asses the functions of a system and is widely recognized as an essential component of a 'systematic' approach to design, on that integrated operational and user requirements into the standard design process. (author)

  3. The Knitting Lesson.

    Science.gov (United States)

    Smith, Pamela

    1987-01-01

    Based on Jean-Francois Millet's 1869 painting, "The Knitting Lesson," this lesson's goal is to introduce students in grades seven through nine to genre (everyday life) painting the nineteenth century. The lesson is also designed to show that some aspects of genre may be timeless. (BSR)

  4. RELAP-7 Closure Correlations

    Energy Technology Data Exchange (ETDEWEB)

    Zou, Ling [Idaho National Lab. (INL), Idaho Falls, ID (United States); Berry, R. A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Martineau, R. C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Andrs, D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Zhang, H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hansel, J. E. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Sharpe, J. P. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Johns, Russell C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-04-01

    The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). The code is based on the INL’s modern scientific software development framework, MOOSE (Multi-Physics Object Oriented Simulation Environment). The overall design goal of RELAP-7 is to take advantage of the previous thirty years of advancements in computer architecture, software design, numerical integration methods, and physical models. The end result will be a reactor systems analysis capability that retains and improves upon RELAP5’s and TRACE’s capabilities and extends their analysis capabilities for all reactor system simulation scenarios. The RELAP-7 code utilizes the well-posed 7-equation two-phase flow model for compressible two-phase flow. Closure models used in the TRACE code has been reviewed and selected to reflect the progress made during the past decades and provide a basis for the colure correlations implemented in the RELAP-7 code. This document provides a summary on the closure correlations that are currently implemented in the RELAP-7 code. The closure correlations include sub-grid models that describe interactions between the fluids and the flow channel, and interactions between the two phases.

  5. Lessons learned from the tokamak Advanced Reactor Innovation and Evaluation Study (ARIES)

    International Nuclear Information System (INIS)

    Krakowski, R.A.; Bathke, C.G.; Miller, R.L.; Werley, K.A.

    1994-01-01

    Lessons from the four-year ARIES (Advanced Reactor Innovation and Evaluation Study) investigation of a number of commercial magnetic-fusion-energy (MFE) power-plant embodiments of the tokamak are summarized. These lessons apply to physics, engineering and technology, and environmental, safety, and health (ES ampersand H) characteristics of projected tokamak power plants. Summarized herein are the composite conclusions and lessons developed in the course of four conceptual tokamak power-plant designs. A general conclusion from this extensive investigation of the commercial potential of tokamak power plants is the need for combined, symbiotic advances in both physics, engineering, and materials before economic competitiveness with developing advanced energy sources can be realized. Advances in materials are also needed for the exploitation of environmental advantages otherwise inherent in fusion power

  6. Community-based interventions for obesity prevention: lessons learned by Australian policy-makers

    Directory of Open Access Journals (Sweden)

    Haby Michelle M

    2012-01-01

    Full Text Available Abstract Background Interest in community-based interventions (CBIs for health promotion is increasing, with a lot of recent activity in the field. This paper aims, from a state government perspective, to examine the experience of funding and managing six obesity prevention CBIs, to identify lessons learned and to consider the implications for future investment. Specifically, we focus on the planning, government support, evaluation, research and workforce development required. Methods The lessons presented in this paper come from analysis of key project documents, the experience of the authors in managing the projects and from feedback obtained from key program stakeholders. Results CBIs require careful management, including sufficient planning time and clear governance structures. Selection of interventions should be based on evidence and tailored to local needs to ensure adequate penetration in the community. Workforce and community capacity must be assessed and addressed when selecting communities. Supporting the health promotion workforce to become adequately skilled and experienced in evaluation and research is also necessary before implementation. Comprehensive evaluation of future projects is challenging on both technical and affordability grounds. Greater emphasis may be needed on process evaluation complemented by organisation-level measures of impact and monitoring of nutrition and physical activity behaviours. Conclusions CBIs offer potential as one of a mix of approaches to obesity prevention. If successful approaches are to be expanded, care must be taken to incorporate lessons from existing and past projects. To do this, government must show strong leadership and work in partnership with the research community and local practitioners.

  7. TMI-2 lessons have been learned

    International Nuclear Information System (INIS)

    Long, R.L.

    1994-01-01

    This paper is an introduction to the more detailed papers which are presented in this session titled ''Advanced Light Water Reactors -- 15 Years After TMI.'' Many of the advances in the design, operation and maintenance of nuclear power plants are the direct result of applying lessons learned from the 1979 TMI-2 accident. The authors believe the ''reality awakening'' which occurred following the accident should never be forgotten. Thus, this paper briefly reviews the TMI-2 accident and identifies the broad lessons learned following the accident. Then it describes briefly some indicators which show the very impressive improvements in nuclear power plant performance that have occurred over the past 10-15 years. This sets the stage for Dr. Ransom's paper which shows the continuing need for nuclear power, Dr. Beckjord's paper which describes the ''final'' TMI-2 research project and the subsequent papers which focus on advanced light water reactor developments

  8. The effectiveness of eye-closure in repeated interviews

    OpenAIRE

    Vredeveldt, A.; Baddeley, A.D.; Hitch, G.J.

    2014-01-01

    Purpose Closing the eyes during recall can help witnesses remember more about a witnessed event. This study examined the effectiveness of eye-closure in a repeated recall paradigm with immediate free recall followed 1 week later by both free and cued recall. We examined whether eye-closure was more or less effective during the second free-recall attempt compared with the first, whether eye-closure during the first recall attempt had an impact on subsequent free- and cued-recall performance, a...

  9. Closure of the squared Zakharov--Shabat eigenstates

    International Nuclear Information System (INIS)

    Kaup, D.J.

    1976-01-01

    By solution of the inverse scattering problem for a third-order (degenerate) eigenvalue problem, the closure of the squared eigenfunctions of the Zakharov--Shabat equations is found. The question of the completeness of squared eigenstates occurs in many aspects of ''inverse scattering transforms'' (solving nonlinear evolution equations exactly by inverse scattering techniques), as well as in various aspects of the inverse scattering problem. The method used here is quite suggestive as to how one might find the closure of the squared eigenfunctions of other eigenvalue equations, and the strong analogy between these results and the problem of finding the closure of the eigenvectors of a nonself-adjoint matrix is pointed out

  10. Review of Analytes of Concern and Sample Methods for Closure of DOE High Level Waste Storage Tanks

    International Nuclear Information System (INIS)

    Thomas, T.R.

    2002-01-01

    Sampling residual waste after tank cleaning and analysis for analytes of concern to support closure and cleaning targets of large underground tanks used for storage of legacy high level radioactive waste (HLW) at Department of Energy (DOE) sites has been underway since about 1995. The DOE Tanks Focus Area (TFA) has been working with DOE tank sites to develop new sampling plans, and sampling methods for assessment of residual waste inventories. This paper discusses regulatory analytes of concern, sampling plans, and sampling methods that support closure and cleaning target activities for large storage tanks at the Hanford Site, the Savannah River Site (SRS), the Idaho National Engineering and Environmental Laboratory (INEEL), and the West Valley Demonstration Project (WVDP)

  11. IVHS Institutional Issues and Case Studies, Analysis and Lessons Learned, Final Report

    Science.gov (United States)

    1994-04-01

    This 'Analysis and Lessons Learned' report contains observations, conclusions, and recommendations based on the performance of six case studies of Intelligent Vehicle-Highway Systems (IVHS) projects. Information to support the development of the case...

  12. The Office of Site Closure: Progress in the Face of Challenges

    International Nuclear Information System (INIS)

    Fiore, J. J.; Murphie, W. E.; Meador, S. W.

    2002-01-01

    The Office of Site Closure (OSC) was formed in November 1999 when the Department of Energy's (DOE's) Office of Environmental Management (EM) reorganized to focus specifically on site cleanup and closure. OSC's objective is to achieve safe and cost-effective cleanups and closures that are protective of our workers, the public, and the environment, now and in the future. Since its inception, OSC has focused on implementing a culture of safe closure, with emphasis in three primary areas: complete our responsibility for the Closure Sites Rocky Flats, Mound, Fernald, Ashtabula, and Weldon Spring; complete our responsibility for cleanup at sites where the DOE mission has been completed (examples include Battelle King Avenue and Battelle West Jefferson in Columbus, and General Atomics) or where other Departmental organizations have an ongoing mission (examples include the Brookhaven, Livermore, or Los Alamos National Laboratories, and the Nevada Test Site); and create a framework a nd develop specific business closure tools that will help sites close, such as guidance for and decisions on post-contract benefit liabilities, records retention, and Federal employee incentives for site closure. This paper discusses OSC's 2001 progress in achieving site cleanups, moving towards site closure, and developing specific business closure tools to support site closure. It describes the tools used to achieve progress towards cleanup and closure, such as the application of new technologies, changes in contracting approaches, and the development of agreements between sites and with host states. The paper also identifies upcoming challenges and explores options for how Headquarters and the sites can work together to address these challenges. Finally, it articulates OSC's new focus on oversight of Field Offices to ensure they have the systems in place to oversee contractor activities resulting in site cleanups and closures

  13. Stomal Closure: Strategies to Prevent Incisional Hernia

    Science.gov (United States)

    Harries, Rhiannon L.; Torkington, Jared

    2018-01-01

    Incisional hernias following ostomy reversal occur frequently. Incisional hernias at the site of a previous stoma closure can cause significant morbidity, impaired quality of life, lead to life-threatening hernia incarceration or strangulation and result in a significant financial burden on health care systems Despite this, the evidence base on the subject is limited. Many recognised risk factors for the development of incisional hernia following ostomy reversal are related to patient factors such as age, malignancy, diabetes, COPD, hypertension and obesity, and are not easily correctable. There is a limited amount of evidence to suggest that prophylactic mesh reinforcement may be of benefit to reduce the post stoma closure incisional hernia rate but a further large scale randomised controlled trial is due to report in the near future. There appears to be weak evidence to suggest that surgeons should favour circular, or “purse-string” closure of the skin following stoma closure in order to reduce the risk of SSI, which in turn may reduce incisional hernia formation. There remains the need for further evidence in relation to suture technique, skin closure techniques, mechanical bowel preparation and oral antibiotic prescription focusing on incisional hernia development as an outcome measure. Within this review, we discuss in detail the evidence base for the risk factors for the development of, and the strategies to prevent ostomy reversal site incisional hernias. PMID:29670882

  14. Stomal Closure: Strategies to Prevent Incisional Hernia

    Directory of Open Access Journals (Sweden)

    Rhiannon L. Harries

    2018-04-01

    Full Text Available Incisional hernias following ostomy reversal occur frequently. Incisional hernias at the site of a previous stoma closure can cause significant morbidity, impaired quality of life, lead to life-threatening hernia incarceration or strangulation and result in a significant financial burden on health care systems Despite this, the evidence base on the subject is limited. Many recognised risk factors for the development of incisional hernia following ostomy reversal are related to patient factors such as age, malignancy, diabetes, COPD, hypertension and obesity, and are not easily correctable. There is a limited amount of evidence to suggest that prophylactic mesh reinforcement may be of benefit to reduce the post stoma closure incisional hernia rate but a further large scale randomised controlled trial is due to report in the near future. There appears to be weak evidence to suggest that surgeons should favour circular, or “purse-string” closure of the skin following stoma closure in order to reduce the risk of SSI, which in turn may reduce incisional hernia formation. There remains the need for further evidence in relation to suture technique, skin closure techniques, mechanical bowel preparation and oral antibiotic prescription focusing on incisional hernia development as an outcome measure. Within this review, we discuss in detail the evidence base for the risk factors for the development of, and the strategies to prevent ostomy reversal site incisional hernias.

  15. Project Read[R] Phonology. What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2010

    2010-01-01

    "Project Read"[R] is a multisensory language arts curriculum designed for use in a classroom or group setting. Two main objectives of the program are to use language in all its forms, and to use responsive instruction rather than preplanned textbook lessons. The program emphasizes direct instruction, and lessons move from letter-sounds…

  16. Geometry of $B\\times B$-orbit closures in equivariant embeddings

    DEFF Research Database (Denmark)

    He, Xuhua; Thomsen, Jesper Funch

    2007-01-01

    Let X denote an equivariant embedding of a connected reductive group G over an algebraically closed field k. Let B denote a Borel subgroup of G and let Z denote a B×B -orbit closure in X. When the characteristic of k is positive and X is projective we prove that Z is globally F-regular. As a cons......-regular. As a consequence, Z is normal and Cohen–Macaulay for arbitrary X and arbitrary characteristics. Moreover, in characteristic zero it follows that Z has rational singularities. This extends earlier results by the second author and M. Brion....

  17. Case Report: Rapid staged abdominal closure using Gore-Tex® mesh as a bridge to primary omphalocele sac closure

    Directory of Open Access Journals (Sweden)

    William C. Kethman

    2016-06-01

    Full Text Available Omphaloceles present an ongoing challenge due to significant variations in presentation and associated co-morbidities. Diverse management strategies have been described to tackle many of the fundamental challenges of closure and reconstruction of the abdominal wall – this fact demonstrates a need for increasingly individualized management options for this complex disease. We describe a novel method of rapid staged abdominal wall closure using Gore-Tex® mesh as a bridge to primary omphalocele closure in an infant with partial Pentalogy of Cantrell and giant ruptured omphalocele. This strategy can be used in management of some of the most complex abdominal wall defects.

  18. Design of a GIS-based rating protocol to assess the potential for landfill closure using dredge material in post Hurricane Sandy New Jersey.

    Science.gov (United States)

    Miskewitz, Robert J; Barone, Daniel; Guterl, Sar J; Uchrin, Christopher G

    2017-05-12

    New Jersey is rapidly running out of capacity for storage of dredged material. A potential solution to this lack of storage space is to remove and reuse the dredged material for some beneficial use. Results from a Rutgers University project performed for the New Jersey Department of Transportation, Office of Maritime Resources, designed to assess the potential for closure of New Jersey landfills using dredge material from existing Confined Disposal Facilities (CDFs) are presented and discussed. The project included an update of the existing NJDEP landfill database, the development of a rating system to identify landfills with the highest potential to utilize dredged material for their closure, and the identification and preliminary investigation of the top candidate landfills based on this rating system.

  19. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  20. Bidirectional Barbed Sutures for Wound Closure: Evolution and Applications

    Science.gov (United States)

    Paul, Malcolm D.

    2009-01-01

    Traditionally, wound closure sutures have in common the need to tie knots with the inherent risk of extrusion, palpability, microinfarcts, breakage, and slippage. Bidirectional barbed sutures have barbs arrayed in a helical fashion in opposing directions on either side of an unbarbed midsegment. This suture is inserted at the midpoint of a wound and pulled through till resistance is encountered from the opposing barbs; each half of the suture is then advanced to the lateral ends of the wound. This design provides a method of evenly distributing tension along the incision line, a faster suture placement and closure time with no need to tie knots, and the possibility of improved cosmesis. Bidirectional barbed sutures, which are available in both absorbable and nonabsorbable forms, can be used for simple closures, multilayered closures, and closure of high-tension wounds in a variety of surgical settings. PMID:24527114

  1. Primary angle closure glaucoma in a myopic kinship.

    Science.gov (United States)

    Hagan, J C; Lederer, C M

    1985-03-01

    Three related myopic individuals with primary angle closure glaucoma are reported. They had true myopia and not pseudomyopia secondary to increased lenticular index of refraction. We believe one of these individuals (-8.62 spherical equivalent) to have the most myopic case of primary angle closure glaucoma reported in the literature. Although myopia is associated with anatomical factors that offer considerable protection from primary angle closure glaucoma, its presence does not eliminate the possibility of this disease. Laser iridectomy was effective in the treatment of these patients.

  2. Influence of Closure & Non-Closure of the Visceral and Parietal Peritoneum on Post Cesarean Morbidity

    Directory of Open Access Journals (Sweden)

    Tabasi Z.

    2010-01-01

    Full Text Available AbstractBackground and Objectives: One of the most important issues in promoting mother and child health is reducing the morbidity rate after cesarean section. The aim of this study was to investigate the influence of closure and non-closure of the visceral and parietal peritoneum on post cesarean morbidity in women attending Shabihkhani Maternity Hospital in Kashan, Iran.Methods: This study was conducted with a single blind randomized clinical trial method on 100 parturient women that underwent emergency or elective cesarean section. Patients with previous cesarean section and or abdominal surgery, diseases such as hypertension, diabetes mellitus and premature rupture of membrane and pre operative bleeding, were excluded from this study. Then, the participants were randomly divided into two groups: in one group both peritoneal layers were closed while in the other group, they were not closed. Post operative morbidity including fever, bleeding, post operative pain, analgesic consumption and time of operation were assessed. Data were analyzed with t-tests, and χ2 and a P<0.05 were considered significant.Results: In this study, there were no significant differences between the two groups with respect to age, gestational age, the reason for caesarean section and gravidity, nor were there any differences with respect to the incidence of fever or bleeding and was similar between the two groups, but there was a significant difference between the two groups regarding to feeling of severe pain (P=0.0003, analgesic consumption (P=0.0003 and time of operation (P=0.004. In the non-closure group, dose of analgesic drugs, pain severity and time of operation were less than those of the other group.Conclusion: The Findings showed that non-closure of peritoneal layers as a shorter and simpler procedure has no influence on increasing post cesarean morbidity. Therefore, due to maternal health promotion and early neonatal breastfeeding, non closure of peritoneal

  3. The history of a lesson

    DEFF Research Database (Denmark)

    Rasmussen, Mikkel Vedby

    2003-01-01

    and emphasises the need to study the history of lessons rather than the lessons of history. This approach shows that Munich is the end point of a constitutive history that begins in the failure of the Versailles treaty to create a durable European order following the First World War. The Munich lesson is thus......The article investigates the concept of lessons in IR. By means of a constructivist critique of the 'lessons literature', the article analyses one of the most important of IR lessons: that of Munich. Examining how the Munich lesson came about, the article shows the praxeological nature of lessons...... one element of the lesson of Versailles, which is a praxeology that defines how the West is to make peace, and against whom peace must be defended. The lesson of Versailles has been, at least in part, constitutive of the outbreak of the Cold War, and it continues to define the Western conception...

  4. Improving the Identification, Dissemination and Implementation of Deactivation and Decommissioning Lessons Learned and Best Practices

    International Nuclear Information System (INIS)

    Waisley, Sandra L.; Lackey, Michael B.; Dusek, Lansing G.

    2008-01-01

    Approximately $150 billion of work currently remains in the United States Department of Energy's (DoE's) Office of Environmental Management (EM) life cycle budget for U.S. projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and to develop a knowledge-management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. This paper discusses DoE's rationale for using lessons learned and best practices to improve safety and performance while reducing life cycle costs for Deactivation and Decommissioning (D and D) projects. It also provides an update on the Energy Facility Contractors Group's (EFCOG's) progress in supporting DoE's efforts. At this juncture the best practice efforts described are in developmental stages; however, the commitment to and the concrete nature of the work thus far is noteworthy in regard to improving the way D and D lessons learned and best practices are identified, disseminated and implemented across the DOE Complex

  5. Nitric oxide in guard cells as an important secondary messenger during stomatal closure

    Directory of Open Access Journals (Sweden)

    Gunja eGayatri

    2013-10-01

    Full Text Available he modulation of guard cell function is the basis of stomatal closure, essential for optimizing water use and CO2 uptake by leaves. Nitric oxide (NO in guard cells plays a very important role as a secondary messenger during stomatal closure induced by effectors, including hormones. For example, exposure to abscisic acid (ABA triggers a marked increase in NO of guard cells, well before stomatal closure. In guard cells of multiple species, like Arabidopsis, Vicia and pea, exposure to ABA or methyl jasmonate or even microbial elicitors (e.g. chitosan induces production of NO as well as reactive oxygen species (ROS. The role of NO in stomatal closure has been confirmed by using NO donors (e.g. SNP and NO scavengers (like cPTIO and inhibitors of NOS (L-NAME or NR (tungstate. Two enzymes: a L-NAME-sensitive, nitric oxide synthase (NOS-like enzyme and a tungstate-sensitive nitrate reductase (NR, can mediate ABA-induced NO rise in guard cells. However, the existence of true NOS in plant tissues and its role in guard cell NO-production are still a matter of intense debate. Guard cell signal transduction leading to stomatal closure involves the participation of several components, besides NO, such as cytosolic pH, ROS, free Ca2+ and phospholipids. Use of fluorescent dyes has revealed that the rise in NO of guard cells occurs after the increase in cytoplasmic pH and ROS. The rise in NO causes an elevation in cytosolic free Ca2+ and promotes the efflux of cations as well as anions from guard cells. Stomatal guard cells have become a model system to study the signalling cascade mechanisms in plants, particularly with NO as a dominant component. The interrelationships and interactions of NO with cytosolic pH, ROS, and free Ca2+ are quite complex and need further detailed examination. While assessing critically the available literature, the present review projects possible areas of further work related to NO-action in stomatal guard cells.

  6. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 1 [of 2

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach to waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E) Vendor List

  7. Environmental analysis of closure options for waste sites at the Savannah River Plant

    International Nuclear Information System (INIS)

    Gordon, D.E.; King, C.M.; Looney, B.B.; Stephenson, D.E.; Johnson, W.F.

    1987-01-01

    Previously acceptable waste management practices (e.g., the use of unlined seepage basins) for discarding of wastes from nuclear materials production has resulted in occasional cases of groundwater contamination beneath some disposal sites, mainly in water-table aquifers. Groundwater contaminants include volatile organic compounds, heavy metals, radionuclides, and other chemicals. The closure of active and inactive waste sites that have received hazardous and/or low-level radioactive materials at the Savannah River Plant (SRP) is planned as part of an overall program to protect groundwater quality. DOE developed and submitted to Congress a groundwater protection plan for SRP. This initial plan and subsequent revisions provide the basis for closure of SRP waste sites to comply with applicable groundwater protection requirements. An environmental analysis of the closure options for the criteria waste sites that have received hazardous and/or low-level radioactive wastes was conducted to provide technical support. The several parts of this environmental analysis include description of geohydrologic conditions; determination of waste inventories; definition of closure options; modeling of environmental pathways; assessment of risk; and analysis of project costs. Each of these components of the overall analysis is described in turn in the following paragraphs. Production operations at SRP have generated a variety of solid, hazardous, and low-level radioactive waste materials. Several locations onplant have been used as waste disposal sites for solid and liquid wastes. Seventy-six individual waste sites at 45 distinct geographical locations on SRP have received hazardous, low-level radioactive, or mixed wastes. These waste sites can be categorized into 26 groupings according to the function of the waste disposed. 15 refs., 6 figs., 5 tabs

  8. Lesson Learning at JPL

    Science.gov (United States)

    Oberhettinger, David

    2011-01-01

    A lessons learned system is a hallmark of a mature engineering organization A formal lessons learned process can help assure that valuable lessons get written and published, that they are well-written, and that the essential information is "infused" into institutional practice. Requires high-level institutional commitment, and everyone's participation in gathering, disseminating, and using the lessons

  9. Hamiltonian closures in fluid models for plasmas

    Science.gov (United States)

    Tassi, Emanuele

    2017-11-01

    This article reviews recent activity on the Hamiltonian formulation of fluid models for plasmas in the non-dissipative limit, with emphasis on the relations between the fluid closures adopted for the different models and the Hamiltonian structures. The review focuses on results obtained during the last decade, but a few classical results are also described, in order to illustrate connections with the most recent developments. With the hope of making the review accessible not only to specialists in the field, an introduction to the mathematical tools applied in the Hamiltonian formalism for continuum models is provided. Subsequently, we review the Hamiltonian formulation of models based on the magnetohydrodynamics description, including those based on the adiabatic and double adiabatic closure. It is shown how Dirac's theory of constrained Hamiltonian systems can be applied to impose the incompressibility closure on a magnetohydrodynamic model and how an extended version of barotropic magnetohydrodynamics, accounting for two-fluid effects, is amenable to a Hamiltonian formulation. Hamiltonian reduced fluid models, valid in the presence of a strong magnetic field, are also reviewed. In particular, reduced magnetohydrodynamics and models assuming cold ions and different closures for the electron fluid are discussed. Hamiltonian models relaxing the cold-ion assumption are then introduced. These include models where finite Larmor radius effects are added by means of the gyromap technique, and gyrofluid models. Numerical simulations of Hamiltonian reduced fluid models investigating the phenomenon of magnetic reconnection are illustrated. The last part of the review concerns recent results based on the derivation of closures preserving a Hamiltonian structure, based on the Hamiltonian structure of parent kinetic models. Identification of such closures for fluid models derived from kinetic systems based on the Vlasov and drift-kinetic equations are presented, and

  10. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    Science.gov (United States)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  11. Climate change and landscape development in post-closure safety assessment of solid radioactive waste disposal: Results of an initiative of the IAEA.

    Science.gov (United States)

    Lindborg, T; Thorne, M; Andersson, E; Becker, J; Brandefelt, J; Cabianca, T; Gunia, M; Ikonen, A T K; Johansson, E; Kangasniemi, V; Kautsky, U; Kirchner, G; Klos, R; Kowe, R; Kontula, A; Kupiainen, P; Lahdenperä, A-M; Lord, N S; Lunt, D J; Näslund, J-O; Nordén, M; Norris, S; Pérez-Sánchez, D; Proverbio, A; Riekki, K; Rübel, A; Sweeck, L; Walke, R; Xu, S; Smith, G; Pröhl, G

    2018-03-01

    The International Atomic Energy Agency has coordinated an international project addressing climate change and landscape development in post-closure safety assessments of solid radioactive waste disposal. The work has been supported by results of parallel on-going research that has been published in a variety of reports and peer reviewed journal articles. The project is due to be described in detail in a forthcoming IAEA report. Noting the multi-disciplinary nature of post-closure safety assessments, here, an overview of the work is given to provide researchers in the broader fields of radioecology and radiological safety assessment with a review of the work that has been undertaken. It is hoped that such dissemination will support and promote integrated understanding and coherent treatment of climate change and landscape development within an overall assessment process. The key activities undertaken in the project were: identification of the key processes that drive environmental change (mainly those associated with climate and climate change), and description of how a relevant future may develop on a global scale; development of a methodology for characterising environmental change that is valid on a global scale, showing how modelled global changes in climate can be downscaled to provide information that may be needed for characterising environmental change in site-specific assessments, and illustrating different aspects of the methodology in a number of case studies that show the evolution of site characteristics and the implications for the dose assessment models. Overall, the study has shown that quantitative climate and landscape modelling has now developed to the stage that it can be used to define an envelope of climate and landscape change scenarios at specific sites and under specific greenhouse-gas emissions assumptions that is suitable for use in quantitative post-closure performance assessments. These scenarios are not predictions of the future, but

  12. MNC Subsidiary Closures

    DEFF Research Database (Denmark)

    Sofka, Wolfgang; Torres Preto, Miguel; de Faria, Pedro

    2014-01-01

    We investigate the consequences of MNC subsidiary closures for employees who lose their jobs. In particular, we examine the extent to which the human capital that these employees acquired while employed by the MNC influences the wages they receive in their new jobs. We propose an employee...

  13. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    Science.gov (United States)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  14. Lesson Learned About FPOs from a Customer`s Perspective

    Energy Technology Data Exchange (ETDEWEB)

    Gray, C.J.

    1998-12-31

    Conoco has undertaken three FPSO (Floating Production Storage and Off-loading) projects in the 1990s, Ukpokiti offshore Nigeria, and MacCulloch and Banff in the UK sector of the North Sea. They are different in the technical and commercial solutions they employed. This presentation describes the key features of each project from a commercial and technical perspective and summarizes the good practices and those aspects that could have been improved. The key commercial areas covered include project strategy, contractor selection and leasing issues. The technical areas include facility selection, reservoir characterization, and operations. Lessons learned about Safety Management are also identified. The information about each project is limited to key features only

  15. Investment and Project Economics: Contemporary Lessons for ...

    African Journals Online (AJOL)

    Taking up the contemporary challenge to sensitize and synergize instructional, industrial and governmental functionaries along this line are leading global faculties such as the Academy of Project Management (APM), Project Management Institute (PMI), and Business Analyst (BA) Times, amongst others. This work is ...

  16. Improvement of tricuspid regurgitation after transcatheter ASD closure in older patients.

    Science.gov (United States)

    Chen, L; Shen, J; Shan, X; Wang, F; Kan, T; Tang, X; Zhao, X; Qin, Y

    2017-07-19

    Adult patients with undiagnosed atrial septal defect (ASD) may have right heart cavity enlargement and functional tricuspid valve insufficiency. Moderate or more severe tricuspid regurgitation has been associated with a worse prognosis, and more serious complications are typically seen in older patients. This study aimed to evaluate the improvement in functional tricuspid regurgitation and heart geometry after transcatheter ASD closure in older patients. The data of 111 patients over 60 years of age with moderate or severe tricuspid regurgitation before ASD closure were analyzed. At the 1‑month and 6‑month follow-up after closure, both tricuspid regurgitation jet area and right atrial volume decreased significantly. Right ventricular volume decreased 1 month after closure, showing a further decrease at the end of the 6‑month follow-up. However, 24 patients (21.6%) still had persistent severe tricuspid regurgitation after the procedure. Multivariate analysis revealed that patient age at ASD closure and pulmonary artery systolic pressure determined by echocardiography before closure were predictors of persistent tricuspid regurgitation after closure. Transcatheter ASD closure in older patients could significantly decrease tricuspid regurgitation and improve right heart geometry.

  17. 2727-S Nonradioactive Dangerous Waste Storage Facility clean closure evaluation report

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    This report presents the analytical results of 2727-S NRDWS facility closure verification soil sampling and compares these results to clean closure criteria. The results of this comparison will determine if clean closure of the unit is regulatorily achievable. This report also serves to notify regulators that concentrations of some analytes at the site exceed sitewide background threshold levels (DOE-RL 1993b) and/or the limits of quantitation (LOQ). This report also presents a Model Toxics Control Act Cleanup (MTCA) (WAC 173-340) regulation health-based closure standard under which the unit can clean close in lieu of closure to background levels or LOQ in accordance with WAC 173-303-610. The health-based clean closure standard will be closure to MTCA Method B residential cleanup levels. This report reconciles all analyte concentrations reported above background or LOQ to this health-based cleanup standard. Regulator acceptance of the findings presented in this report will qualify the TSD unit for clean closure in accordance with WAC 173-303-610 without further TSD unit soil sampling, or soil removal and/or decontamination. Nondetected analytes require no further evaluation

  18. The role of project manager in benefits realization management as a project constraint/driver

    Directory of Open Access Journals (Sweden)

    Amr Mossalam

    2016-12-01

    In summary, the results of this paper can be used to: enlarging the project manager responsibilities to acquire the benefits realization, giving a high level 6-step process for benefits management, suggesting a mechanism for managing these benefits through benefits register, benefits realization plan, measures and KPIs and closure business case.

  19. Method of projects on informatics lesson - as means of pupils’ informative competency development.

    Directory of Open Access Journals (Sweden)

    О. Staryh

    2008-06-01

    Full Text Available Information competence forms most effectively by pupils under joint execution of three conditions: problem-solving education, using of multimedia technologies and drafts method. Untraditional lessons that are conducted in Kherson Academical Lyceum help to arouse children’s longing to self-education, realization of their abilities.

  20. A short summary on finite element modelling of fatigue crack closure

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Konjengbam Darunkumar [Indian Institute of Technology, Guwahati (India); Parry, Matthew Roger [Airbus Operations Ltd, Bristol(United Kingdom); Sinclair, Ian [University of Southampton, Southampton (United Kingdom)

    2011-12-15

    This paper presents a short summary pertaining to the finite element modelling of fatigue crack closure. Several key issues related to finite element modelling of fatigue crack closure are highlighted: element type, mesh refinement, stabilization of crack closure, crack-tip node release scheme, constitutive model, specimen geometry, stress-states (i.e., plane stress, plane strain), crack closure monitoring. Reviews are presented for both straight and deflected cracks.

  1. Staged closure of a giant omphalocele with amnion preservation, modified technique

    Directory of Open Access Journals (Sweden)

    Akram H. Aljahdali

    2017-04-01

    Full Text Available Closure of a giant omphalocele can be challenging. Preservation of the amnion in staged closure is not commonly practiced. Here, we describe 2 cases of giant omphalocele treated with a modified amnion preservation, staged closure technique. This paper demonstrates the feasibility and safety of this technique, and the versatility of amnion to adapt to an escharization strategy if closure is not achievable.

  2. Implementing change: lessons from five development projects

    DEFF Research Database (Denmark)

    Riis, J. O.; Hildebrandt, S.; Andreasen, Mogens Myrup

    2001-01-01

    The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... with organizational changes. Thirdly, four paradoxes for managing development projects are presented; they may serve as guidelines for coping with the complexity and uncertainty of change processes......The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... in the change process, the role of a vision of the future company; and organizational learning processes taking place during the development project. Secondly, different interpretation models will be employed in an effort to broaden the understanding of the many facets and viewpoints associated...

  3. DESIGN OF A WELDING AND INSPECTION SYSTEM FOR WASTE STORAGE CLOSURE

    International Nuclear Information System (INIS)

    H.B. Smartt; A.D. Watkins; D.P. Pace; R.J. Bitsoi; E.D. Larsen T.R. McJunkin; C.R. Tolle

    2005-01-01

    This work reported here was done to provide a conceptual design for a robotic welding and inspection system for the Yucca Mountain Repository waste package closure system. The welding and inspection system is intended to make the various closure welds that seal and/or structurally join the lids to the waste package vessels. The welding and inspection system will also perform surface and volumetric inspections of the various closure welds and has the means to repair closure welds, if required. The system is designed to perform these various activities remotely, without the necessity of having personnel in the closure cell

  4. Friction or Closure

    DEFF Research Database (Denmark)

    Lundahl, Mikela

    2014-01-01

    Heritage is a discourse that aims at closure. It fixates the narrative of the past through the celebration of specific material (or sometimes immaterial non-) ob-jects. It organizes temporality and construct events and freezes time. How does this unfold in the case of the UNESCO World Heritage si...

  5. Preparing Future Teacher Leaders: Lessons from Exemplary School Systems

    Science.gov (United States)

    Schrum, Lynne; Levin, Barbara B.

    2013-01-01

    In this paper, we argue that teachers have an opportunity to take on leadership roles in technology-rich schools and districts. Based on data collected during a year-long project to investigate award-winning schools and districts, we used observations, interviews and focus groups, and document analysis to glean lessons learned from leaders and…

  6. Multipass mining sequence room closures: In situ data report

    International Nuclear Information System (INIS)

    Munson, D.E.; Jones, R.L.; Northrop-Salazar, C.L.; Woerner, S.J.

    1992-12-01

    During the construction of the Thermal/Structural In Situ Test Rooms at the Waste Isolation Pilot Plant (WIPP) facility, measurements of the salt displacements were obtained at very early times, essentially concurrent with the mining activity. This was accomplished by emplacing manually read closure gage stations directly at the mining face, actually between the face and the mining machine, immediately upon mining of the intended gage location. Typically, these mining sequence closure measurements were taken within one hour of mining of the location and within one meter of the mining face. Readings were taken at these gage stations as the multipass mining continued, with the gage station reestablished as each successive mining pass destroyed the earlier gage points. Data reduction yields the displacement history during the mining operation. These early mining sequence closure data, when combined with the later data of the permanently emplaced closure gages, gives the total time-dependent closure displacements of the test rooms. This complete closure history is an essential part of assuring that the in situ test databases will provide an adequate basis for validation of the predictive technology of salt creep behavior, as required by the WIPP technology development program for disposal of radioactive waste in bedded salt

  7. Closure Plan for Active Low Level Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    2000-11-16

    This plan has been prepared in response to direction from the U.S. Department of Energy. The purpose of the plan is to define approaches that will be implemented to ensure protection of the public and the environment when active Low-Level Burial Grounds (LLBGs) at the Hanford Site are closed. Performance assessments for active burial grounds in the 200 East and West 200 Areas provide current estimates of potential environmental contamination and doses to the ''maximum exposed individual'' from burial ground operation and closure and compare dose estimates to performance objective dose limits for the facilities. This is an Operational Closure Plan. The intent of the guidance in DOE Order 435.1 is that this plan will be a living document, like the facility performance assessments, and will be revised periodically through the operational life of the LLBGs to reflect updated information on waste inventory. management practices, facility transition planning, schedule dates, assessments of post-closure performance, and environmental consequences. Out year dates identified in this plan are tentative. A Final Closure Plan will be prepared in the future when the timing and extent of closure-related activities for LLBGs can be established with greater certainty. After current operations at the LLBGs are concluded, this plan proposes transitioning of these facilities to the Environmental Restoration Program. This action will enable the Environmental Restoration Program to design and implement consistent and coordinated final remedial actions for active and inactive LLBGs. Active and inactive burial grounds in the 200 West and 200 East Areas are commingled. This plan describes approaches that will be implemented during Interim Closure, Final Closure, and Institutional Control Periods to prepare LLBGs for surface barriers, and the construction of barriers, as well as the scope of inspection, monitoring and maintenance practices that will be performed during

  8. Regulatory issues associated with closure of the Hanford AX Tank Farm ancillary equipment

    International Nuclear Information System (INIS)

    Becker, D.L.

    1998-01-01

    Liquid mixed, high-level radioactive waste has been stored in underground single-shell tanks at the US Department of Energy's (DOE's) Hanford Site. After retrieval of the waste from the single-shell tanks, the DOE will proceed with closure of the tank farm. The 241-AX Tank Farm includes four one-million gallon single-shell tanks in addition to sluice lines, transfer lines, ventilation headers, risers, pits, cribs, catch tanks, buildings, well and associated buried piping. This equipment is classified as ancillary equipment. This document addresses the requirements for regulatory close of the ancillary equipment in the Hanford Site 241-AX Tank Farm. The options identified for physical closure of the ancillary equipment include disposal in place, disposal in place after treatment, excavation and disposal on site in an empty single-shell tank, and excavation and disposal outside the AX Tank Farm. The document addresses the background of the Hanford Site and ancillary equipment in the AX Tank Farm, regulations for decontamination and decommissioning of radioactively contaminated equipment, requirements for the cleanup and disposal of radioactive wastes, cleanup and disposal requirements governing hazardous and mixed waste, and regulatory requirements and issues associated with each of the four physical closure options. This investigation was conducted by the Sandia National Laboratories, Albuquerque, New Mexico, during Fiscal Year 1998 for the Hanford Tanks Initiative Project

  9. Lesson 3: A Case Study of Mountain Tourism in Vietnam.

    Science.gov (United States)

    Byers, Alton; Gilligan, Nancy; Golston, Syd; Linville, Rex

    1999-01-01

    Presents a lesson in which students examine the characteristics of successful and unsuccessful tourism development projects in mountains by utilizing the included list of websites. Expounds that, based on their search of the websites, the students propose solutions for maintaining a balance among environmental conservation, cultural advancement,…

  10. Efficient synthesis of N-alkyl-2,7-dihalocarbazoles by simultaneous carbazole ring closure and N-alkylation

    Czech Academy of Sciences Publication Activity Database

    Výprachtický, Drahomír; Kmínek, Ivan; Pokorná, Veronika; Cimrová, Věra

    2012-01-01

    Roč. 68, č. 25 (2012), s. 5075-5080 ISSN 0040-4020 R&D Projects: GA MŠk(CZ) 1M06031; GA ČR GAP106/12/0827 Institutional research plan: CEZ:AV0Z40500505 Institutional support: RVO:61389013 Keywords : carbazole ring closure * carbazole alkylation * heterocycles Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 2.803, year: 2012

  11. Regional neural tube closure defined by the Grainy head-like transcription factors.

    Science.gov (United States)

    Rifat, Yeliz; Parekh, Vishwas; Wilanowski, Tomasz; Hislop, Nikki R; Auden, Alana; Ting, Stephen B; Cunningham, John M; Jane, Stephen M

    2010-09-15

    Primary neurulation in mammals has been defined by distinct anatomical closure sites, at the hindbrain/cervical spine (closure 1), forebrain/midbrain boundary (closure 2), and rostral end of the forebrain (closure 3). Zones of neurulation have also been characterized by morphologic differences in neural fold elevation, with non-neural ectoderm-induced formation of paired dorso-lateral hinge points (DLHP) essential for neural tube closure in the cranial and lower spinal cord regions, and notochord-induced bending at the median hinge point (MHP) sufficient for closure in the upper spinal region. Here we identify a unifying molecular basis for these observations based on the function of the non-neural ectoderm-specific Grainy head-like genes in mice. Using a gene-targeting approach we show that deletion of Grhl2 results in failed closure 3, with mutants exhibiting a split-face malformation and exencephaly, associated with failure of neuro-epithelial folding at the DLHP. Loss of Grhl3 alone defines a distinct lower spinal closure defect, also with defective DLHP formation. The two genes contribute equally to closure 2, where only Grhl gene dosage is limiting. Combined deletion of Grhl2 and Grhl3 induces severe rostral and caudal neural tube defects, but DLHP-independent closure 1 proceeds normally in the upper spinal region. These findings provide a molecular basis for non-neural ectoderm mediated formation of the DLHP that is critical for complete neuraxis closure. (c) 2010 Elsevier Inc. All rights reserved.

  12. 300 Area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999

  13. 300 Area waste acid treatment system closure plan

    Energy Technology Data Exchange (ETDEWEB)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.

  14. Predictors of successful closure of patent ductus arteriosus with indomethacin.

    Science.gov (United States)

    Ahamed, M F; Verma, P; Lee, S; Vega, M; Wang, D; Kim, M; Fuloria, M

    2015-09-01

    To determine whether platelet counts can predict the likelihood of successful closure of patent ductus arteriosus (PDA) with indomethacin. This was a retrospective cohort study of infants closure with indomethacin and those who failed were compared. Multivariable logistic regression was used to identify predictors of successful ductal closure. In infants with hemodynamically significant PDA, older GA (odds ratio=1.54; 95% confidence interval: 1.12 to 2.13), male gender (odds ratio=3.02; 95% confidence interval: 1.08 to 8.49) and higher platelet count (odds ratio=1.5; 95% confidence interval: 1.04 to 2.17) prior to indomethacin treatment were associated with successful ductal closure with indomethacin. Older GA, male gender and higher platelet count at time of treatment of hemodynamically significant PDA are predictors of successful ductal closure with indomethacin.

  15. 300 Area Process Trenches Closure Plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit

  16. Catheter-based closure of the patent ductus arteriosus in lower weight infants.

    Science.gov (United States)

    Pavlek, Leeann R; Slaughter, Jonathan L; Berman, Darren P; Backes, Carl H

    2018-06-13

    Risks associated with drug therapy and surgical ligation have led health care providers to consider alternative strategies for patent ductus arteriosus (PDA) closure. Catheter-based PDA closure is the procedure of choice for ductal closure in adults, children, and infants ≥6kg. Given evidence among older counterparts, interest in catheter-based closure of the PDA in lower weight (closure devices; (3) review the technical success (feasibility); (4) review the risks (safety profile); (5) discuss the quality of evidence on procedural efficacy; (6) consider areas for future research. The review provided herein suggests that catheter-based PDA closure is technically feasible, but the lack of comparative trials precludes determination of the optimal strategy for ductal closure in this subgroup of infants. Copyright © 2018 Elsevier Inc. All rights reserved.

  17. Oral Paracetamol for Patent Ductus Arteriosus Rescue Closure.

    Science.gov (United States)

    Pharande, Pramod; Watson, Hadley; Tan, Kenneth; Sehgal, Arvind

    2018-01-01

    The objective of this study was to ascertain the efficacy of oral paracetamol in closing a symptomatic patent ductus arteriosus (PDA) when used as 'rescue' option. After obtaining ethics approval, a retrospective appraisal of the data from April 2014 to July 2015 was performed. Infants who were administered oral paracetamol either after unsuccessful therapy with ibuprofen or where it was considered contraindicated were included. A previously published echocardiographic scoring schema to stratify for ductal disease severity was used. Using univariate analysis, characteristics of infants with successful closure were compared with partial (a priori reduction in composite score by ≥ 50% of pretreatment) or no closure. Twenty infants with gestation age and birthweight of 25.7 ± 1.5 weeks and 724.1 ± 143 g, respectively, were studied. Complete closure was noted in 10 (50%) infants with additional four infants showing a significant reduction in haemodynamic shunting. Gestational age at birth and at therapy, chronological age at therapy, birthweight and total fluid intake were comparable between the two groups. The pre-therapy composite score had a significant association with successful closure (the higher the echocardiographic score, the lesser the closure). Concomitant furosemide therapy and late-onset sepsis had a high likelihood ratio of unsuccessful closure (11.01 [2-tailed, p = 0.005] and 5.3 [2-tailed, p = 0.07]), respectively. Oral paracetamol may be a possible therapeutic option in premature infants where therapy with first-line agents is unsuccessful or contraindicated. Concomitant sepsis and furosemide administration may affect successful therapy.

  18. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  19. Late lessons from early warnings: science, precaution, innovation

    DEFF Research Database (Denmark)

    Hansen, Steffen Foss

    2013-01-01

    of chemical and technological innovations, and highlight a number of systemic problems. The 'Late Lessons Project' illustrates how damaging and costly the misuse or neglect of the precautionary principle can be, using case studies and a synthesis of the lessons to be learned and applied to maximising...... rather than present specific estimates for these costs. Making the best use of environmental science and modelling helps to make environmental protection and precaution a priority. Producing cost estimates should not be left to economists alone, but should rather be seen as a starting point for a broader...... discussion, featuring also the relevant expertise in health, ecology, demography, modelling and science. Well researched estimates, based on interdisciplinary collaboration, can strengthen some of those scattered and diffuse interests, which during the ordinary processes of policy-making have difficulty...

  20. Impact of Vial Capping on Residual Seal Force and Container Closure Integrity.

    Science.gov (United States)

    Mathaes, Roman; Mahler, Hanns-Christian; Roggo, Yves; Ovadia, Robert; Lam, Philippe; Stauch, Oliver; Vogt, Martin; Roehl, Holger; Huwyler, Joerg; Mohl, Silke; Streubel, Alexander

    2016-01-01

    The vial capping process is a critical unit operation during drug product manufacturing, as it could possibly generate cosmetic defects or even affect container closure integrity. Yet there is significant variability in capping equipment and processes, and their relation to potential defects or container closure integrity has not been thoroughly studied. In this study we applied several methods-residual seal force tester, a self-developed system of a piezo force sensor measurement, and computed tomography-to characterize different container closure system combinations that had been sealed using different capping process parameter settings. Additionally, container closure integrity of these samples was measured using helium leakage (physical container closure integrity) and compared to characterization data. The different capping equipment settings lead to residual seal force values from 7 to 115 N. High residual seal force values were achieved with high capping pre-compression force and a short distance between the capping plate and plunge. The choice of container closure system influenced the obtained residual seal force values. The residual seal force tester and piezoelectric measurements showed similar trends. All vials passed physical container closure integrity testing, and no stopper rupture was seen with any of the settings applied, suggesting that container closure integrity was warranted for the studied container closure system with the chosen capping setting ranges. The vial capping process is a critical unit operation during drug product manufacturing, as it could possibly generate cosmetic defects or even affect container closure integrity. Yet there is significant variability in capping equipment and processes, and their relation to potential defects or container closure integrity has not been thoroughly studied. In this study we applied several methods-residual seal force tester, a self-developed system of a piezo force sensor measurement, and