Sample records for closure plan revision

  1. 100-D Ponds closure plan. Revision 1

    International Nuclear Information System (INIS)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit is clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure

  2. Single-shell tank closure work plan. Revision A

    International Nuclear Information System (INIS)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs

  3. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  4. 300 Area waste acid treatment system closure plan. Revision 1

    International Nuclear Information System (INIS)

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan

  5. 300 Area waste acid treatment system closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  6. 200 West Area Ash Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The Ash Pit Demolition Site had two known demolition events, the first occurred in November of 1984, and the second occurred in June of 1986. These demolition events were a form of thermal treatment for discarded explosive chemical products. Because the Ash Pit Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations'', Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 200 West Area Ash Pit Demolition Site Closure Plan consists of a Part A, Form 3, Dangerous Waste Permit Application (Revision 4) and a closure plan. An explanation of the Part A, Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the Ash,Pit Demolition Site, the history of the waste treated, and the approach that will be followed to close the Ash Pit Demolition Site. Because there were no radioactively contaminated chemicals involved in the demolitions, the information on radionuclides is provided for ''information only''. Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from Ash Pit Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  7. 105-DR large sodium fire facility closure Plan. Revision 2

    International Nuclear Information System (INIS)

    Ruck, F.A. III.

    1995-03-01

    The 105-DR Large Sodium Fire Facility (LSFF), which was operated 1972-1986, was a research laboratory that occupied the former ventilation supply room on the SW side of the 105-DR Reactor Facility. (The 105-DR defense reactor was shut down in 1964.) LSFF was used to investigate fire and safety aspects of large sodium or other metal alkali fires in the LMFBR facilities; it was also used to store and treat alkali metal waste. This closure plan presents a description of the unit, the history of the waste managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of LSFF is expected. It is located within the 100-DR-2 (source) and 100-HR-3 (groundwater) operable units, which will be addressed through the RCRA facility investigation/corrective measures study process

  8. 303-K Storage Facility closure plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  9. 105-DR Large Sodium Fire Facility closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, and activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950`s and is located in the 100-D Area of the Hanford Site. The building housed the 105-DR defense reactor, which was shut down in 1964. The LSFF was initially used only for engineering-scale alkali metal reaction studies. In addition, the Fusion Safety Support Studies program sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium lead compounds. The facility has also been used to store and treat alkali metal waste, therefore the LSFF is subject to the regulatory requirements for the storage and treatment of dangerous waste. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610. This closure plan presents a description of the facility, the history of waste managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected.

  10. 218-E-8 Borrow Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The 218-E-8 Demolition Site was the site of a single demolition event in November of 1984. This demolition event was a form of thermal treatment for discarded explosive chemical products. Because the 218-E-8 Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations,'' Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 218-E-8 Borrow Pit Demolition Site Closure Plan consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3, Revision 4, and a closure plan. An explanation of the Part A Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the 218-E-8 Demolition Site, the history of the waste treated, and the approach that will be followed to close the 218-E-8 Demolition Site. Because there were no radioactively contaminated chemicals involved in t he demolitions at the 218-E-8 Borrow Pit site, the information on radionuclides is provided for ''information only.'' Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from 218-E-8 Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  11. 300 area solvent evaporator interim status closure plan: Revision 2

    International Nuclear Information System (INIS)

    1989-02-01

    This document describes activities for the closure of a hazardous waste tank treatment facility operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (WHC). This treatment facility was a solvent evaporator located in the 300 Area of the Hanford Site, from 1975 to 1985 on behalf of DOE-RL. The 300 Area Solvent Evaporator (300 ASE) was a modified load lugger (dumpster) in which solvent wastes were evaporated. Some of the solvents were radioactively contaminated because they came from a degreaser which processed bare uranium metal billets from the N Reactor Fuel Manufacturing Facility. The waste was composed of perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, ethyl acetate/bromine solution, paint shop solvents and possibly some used oil. Also, small amounts of uranium, copper, zirconium and possibly beryllium were present in the degreaser solvents as particulates. Radioactive and non-radioactive solvents were not segregated in the 300 ASE, and the entire mixture was regarded as mixed waste

  12. 2101-M pond closure plan. Volume 1, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Izatt, R. D.; Lerch, R. E.

    1993-06-01

    This document describes activities for the closure of a surface impoundment (2101-M Pond) at the Hanford Site. The 2101-H Pond was initially constructed in 1953 to serve as a drainage collection area for the 2101-H Building. (Until the Basalt Waste Isolation Project (BWIP) Laboratory was constructed in the 2101-M Building in 1979--1981, the only source contributing discharge to the pond was condensate water from the 2101-H Building heating, ventilation, and air conditioning (HVAC) system. The drains for the BWIP Laboratory rooms were plumbed into a 4-in., cast-iron, low-pressure drain pipe that carries waste water from the HVAC system to the pond. During the active life of the BWIP Laboratory, solutions of dissolved barium in groundwater samples were discharged to the 2101-M Pond via the laboratory drains. As a result of the discharges, a Part A permit application was initially submitted to the Washington State Department of Ecology (Ecology) in August 1986 which designates the 2101-M Pond as a surface impoundment.

  13. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-11-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.

  14. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  15. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document

  16. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  17. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references

  18. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.

  19. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  20. 300 Area Process Trenches Closure Plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit

  1. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110

  2. 304 Concretion facility closure plan

    International Nuclear Information System (INIS)

    1990-04-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium Zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/Zircaloy-2 alloy, and Zircaloy-2 chips and fines were secured in concrete billets in the 304 Concretion Facility, located in the 300 Area. The beryllium/Zircaloy-2 alloy and Zircaloy-2 chips and fines are designated as low-level radioactive mixed waste (LLRMW) with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Concretion Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act of 1976 (RCRA). This closure plan presents a description of the facility, the history of materials and wastes managed, and the procedures that will be followed to close the 304 Concretion Facility (304 Facility). Clean closure of the 304 Facility is the proposed method for closure of the facility. Justification for this proposal is presented. 15 refs., 22 figs., 4 tabs

  3. 304 Concretion Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with Zircaloy-2 and copper silicon allo , uranium-titanium alloy, beryllium/Zircaloy-2 alloy, and Zircaloy-2 chips and fines were secured in concrete billets (7.5-gal containers) in the 304 Concretion Facility (304 Facility), located in the 300 Area. The beryllium/Zircaloy-2 alloy and Zircaloy-2 chips and fines are designated as low-level radioactive mixed waste (LLRMW) with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Concretion Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act of 1976 (RCRA) and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040 (Ecology 1991). This closure plan presents a description of the facility, the history of materials and wastes managed, and the procedures that will be followed to close the 304 Facility. The strategy for closure of the 304 Facility is presented in Section 6.0

  4. Streamlined approach for environmental restoration work plan for Corrective Action Unit 126: Closure of aboveground storage tanks, Nevada Test Site, Nevada. Revision 1

    International Nuclear Information System (INIS)

    1998-07-01

    This plan addresses the closure of several aboveground storage tanks in Area 25 of the Nevada Test Site. The unit is currently identified as Corrective Action Unit 126 in the Federal Facility Agreement and Consent Order and is listed as having six Corrective Action Sites. This plan addresses the Streamlined Approach for Environmental Restoration closure for five of the six sites. Four of the CASs are located at the Engine Test Stand complex and one is located in the Central Support Area. The sites consist of aboveground tanks, two of which were used to store diesel fuel and one stored Nalcool (an antifreeze mixture). The remaining tanks were used as part of a water demineralization process and stored either sulfuric acid or sodium hydroxide, and one was used as a charcoal adsorption furnace. Closure will be completed by removal of the associated piping, tank supports and tanks using a front end loader, backhoe, and/or crane. When possible, the tanks will be salvaged as scrap metal. The piping that is not removed will be sealed using a cement grout

  5. 300 Area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999

  6. 300 Area waste acid treatment system closure plan

    Energy Technology Data Exchange (ETDEWEB)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.

  7. Hanford Patrol Academy Demolition Sites Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    From 1975 to 1991 the Hanford Patrol Academy Demolition Sites (HPADS) were used for demolition events. These demolition events were a form of thermal treatment for spent or abandoned chemical waste. Because the HPADS will no longer be used for this thermal activity, the sites will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and 40 CFR 270.1. Closure also will satisfy closure requirements of WAC 173-303-680 and for the thermal treatment closure requirements of 40 CFR 265.381. This closure plan presents a description of the HPADS, the history of the waste treated, and the approach that will be followed to close the HPADS. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. Only dangerous constituents derived from HPADS operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i). The HPADS are actually two distinct soil closure areas within the Hanford Patrol Academy training area

  8. Philippines revises power plans

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, D.

    1988-02-01

    Following an unexpected surge in electricity demand the Philippines has revised its medium term power development programme. The sharp increase in electricity consumption follows three years of slack demand due to civil disturbances before the end of the Macros administration and the election of Corazon Aquino as President in 1986. Originally, the Aquino government's medium term power development plans called for about 500MW of generating capacity to be installed between 1986 and 1992. The three proposed plants were scheduled for commissioning in 1991 and 1992. However, a spurt in power demand growth during the past nine months has caused concern among industrialists that power shortages could occur by the end of the decade. So additional capacity will be installed to prevent an anticipated shortfall in electricity supplies by the early 1990s.

  9. Strategic Planning for Hot Cell Closure

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2001-01-01

    The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to be located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping, and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adequate attention to detail when the situation required contributed to the process credibility and a successful plan

  10. Closure Plan for Active Low Level Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    2000-11-16

    This plan has been prepared in response to direction from the U.S. Department of Energy. The purpose of the plan is to define approaches that will be implemented to ensure protection of the public and the environment when active Low-Level Burial Grounds (LLBGs) at the Hanford Site are closed. Performance assessments for active burial grounds in the 200 East and West 200 Areas provide current estimates of potential environmental contamination and doses to the ''maximum exposed individual'' from burial ground operation and closure and compare dose estimates to performance objective dose limits for the facilities. This is an Operational Closure Plan. The intent of the guidance in DOE Order 435.1 is that this plan will be a living document, like the facility performance assessments, and will be revised periodically through the operational life of the LLBGs to reflect updated information on waste inventory. management practices, facility transition planning, schedule dates, assessments of post-closure performance, and environmental consequences. Out year dates identified in this plan are tentative. A Final Closure Plan will be prepared in the future when the timing and extent of closure-related activities for LLBGs can be established with greater certainty. After current operations at the LLBGs are concluded, this plan proposes transitioning of these facilities to the Environmental Restoration Program. This action will enable the Environmental Restoration Program to design and implement consistent and coordinated final remedial actions for active and inactive LLBGs. Active and inactive burial grounds in the 200 West and 200 East Areas are commingled. This plan describes approaches that will be implemented during Interim Closure, Final Closure, and Institutional Control Periods to prepare LLBGs for surface barriers, and the construction of barriers, as well as the scope of inspection, monitoring and maintenance practices that will be performed during

  11. Development of an arid site closure plan

    International Nuclear Information System (INIS)

    Nyhan, J.W.; Barnes, F.J.

    1987-01-01

    This document describes the development of a prototype plan for the effective closure and stabilization of an arid low-level waste disposal site. This plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models, CREAMS and HELP, was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that CREAMS generally represented soil moisture more accurately than HELP simulations. Precautions for determining parameter values for model input and for interpreting simulation results are discussed. A specific example is presented showing how the field-validated hydrologic models can be used to develop a final prototype closure plan. 15 refs., 13 figs., 3 tabs

  12. Environmental considerations in mine closure planning

    International Nuclear Information System (INIS)

    Ricks, G.

    1997-01-01

    Mine closure planning considers the best ways to plan and manage the environmental changes and socio-economic effects associated with the closing of mines. While the criteria for judging successful closures may vary, it is particularly important for physical, chemical and biological stability to be achieved and for final land use to be appropriate. Trust funds are increasingly favoured as a practical means of fulfilling the requirement for a financial surety and of ensuring that financial provision is available at the end of the mine's life. (author)

  13. 2101-M pond closure plan

    International Nuclear Information System (INIS)

    1993-06-01

    This document describes activities for the closure of a surface impoundment (2101-M Pond) at the Hanford Site. The 2101-H Pond was initially constructed in 1953 to serve as a drainage collection area for the 2101-H Building. (Until the Basalt Waste Isolation Project (BWIP) Laboratory was constructed in the 2101-M Building in 1979--1981, the only source contributing discharge to the pond was condensate water from the 2101-H Building heating, ventilation, and air conditioning (HVAC) system. The drains for the BWIP Laboratory rooms were plumbed into a 4-in., cast-iron, low-pressure drain pipe that carries waste water from the HVAC system to the pond. During the active life of the BWIP Laboratory, solutions of dissolved barium in groundwater samples were discharged to the 2101-M Pond via the laboratory drains. As a result of the discharges, a Part A permit application was initially submitted to the Washington State Department of Ecology (Ecology) in August 1986 which designates the 2101-M Pond as a surface impoundment

  14. Improving environmental performance through mine closure planning

    International Nuclear Information System (INIS)

    McKee, W.; McKenna, G.

    1998-01-01

    Syncrude has been investigating landscape redevelopment concepts since 1995 after a two-year tailings technology selection study resulted in a major shift in their long-term tailings disposal strategy. The change from fluid disposal to solid disposal of tailings leads to a different landscape, incorporating a new water material type, new landforms and a new schedule of reclamation activity. A multidisciplinary approach was needed to assess, design and develop the final landscape. Planning approach in progress at Syncrude Canada was described, and the basic concepts and tools of closure planning discovered to date were outlined. The economic impacts of closure planning on mining and tailings operations in general, were discussed. 14 refs

  15. Hexone Storage and Treatment Facility closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The HSTF is a storage and treatment unit subject to the requirements for the storage and treatment of dangerous waste. Closure is being conducted under interim status and will be completed pursuant to the requirements of Washington State Department of Ecology (Ecology) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 and WAC 173-303-640. Because dangerous waste does not include the source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of WAC 173-303 or of this closure plan. The information on radionuclides is provided only for general knowledge where appropriate. The known hazardous/dangerous waste remaining at the site before commencing other closure activities consists of the still vessels, a tarry sludge in the storage tanks, and residual contamination in equipment, piping, filters, etc. The treatment and removal of waste at the HSTF are closure activities as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and WAC 173-303

  16. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  17. Addendum to the post-closure permit application for the Bear Creek Hydrogeologic Regime at the Y-12 Plant: Walk-in pits. Revision 2

    International Nuclear Information System (INIS)

    1995-04-01

    The revised Closure Plan was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits (WIPs) of the Bear Creek Burial Grounds (BCBG). However, a strategy was developed to include the B Area [a solid waste management unit (SWMU)] with the WIPs so that both areas would be closed under one cap. The plan was presented to the State of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. Therefore, in November 1992, the Closure Plan for B Area and the WIPs was prepared separately from that of the other sites associated with the BCBG and was presented in a RCRA Closure Plan. The Closure Plan revision issued April 1993 was intended to reflect the placement of the Kerr Hollow Quarry debris at the WIPs, revise the closure data, and acknowledge that the disposition of a monitoring well within the closure site could not be verified. A Post-Closure Permit Application (PCPA) was to include the WIPs; however, at the time of submittal, closure of the WIPs had not been certified. This addendum contains information on the WIPs to accompany the BCBG PCPA. The purpose of this document is to supplement the information provided in the BCBG PCPA. This document is not intended to be a stand-alone document. Only additional information regarding the WIPs is included in the sections of this document, which correspond to sections of the PCPA submitted in June 1994

  18. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  19. 303-K Storage Facility closure plan

    International Nuclear Information System (INIS)

    1993-01-01

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5

  20. Closure plan for the M-Area settling basin and vicinity at the Savannah River Plant

    International Nuclear Information System (INIS)

    Colven, W.P.; Pickett, J.B.; Muska, C.F.; Boone, L.F.

    1988-03-01

    The closure plan for the M-Area settling basin and vicinity was originally submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) Bureau of Solid and Hazardous Waste Management in September 1984. The plan was revised in July and November 1985 in response to SCDHEC comments. After public comment in April through July 1986, the closure plan was conditionally approved by SCDHEC in March 1987. The conditions included (1) providing a temporary wastewater treatment facility to process the water remaining in the basin, (2) using a burn box to limit ash emissions from burning in the basin, (3) obtaining SCDHEC approval prior to operating the leach field, and (4) completing all closure activities within three years of the startup date

  1. Interim status of closure/post-closure plan for 183-H solar evaporation basins

    International Nuclear Information System (INIS)

    1988-03-01

    This report describes a plan for decommissioning several solar evaporation basins on the Hanford reservation. The document describes procedures for sampling during decommissioning and a plan for certification of the resulting completed landfill. Additional plans deal with the training, security of the site, and post-closure monitoring

  2. Planning for closures of hazardous waste land disposal units at the Oak Ridge Y-12 plant

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; DeLozier, M.F.P.; Manrod, W.E.

    1988-01-01

    Eight hazardous waste land disposal units at the Oak Ridge Y-12 Plant are being closed in accordance with the Resource Conservation and Recovery Act (RCRA) under an integrated multi-year program. The units, some of which date back to the early 1950s and include five surface impoundments, two landfills and a land treatment unit, have been used for the management of a variety of types of hazardous wastes. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. The units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. Closure of all eight units must be initiated by November 8, 1988. Funding for the eight closures is being provided by a new Department of Energy budget category, the environmental Restoration Budget Category (ERBC), which is intended to allow for a more rapid response to environmental problems and regulatory requirements. A major project, Closure and Post-Closure Activities (CAPCA) has been identified for ERBC funding to close the land disposal units in accordance with RCRA requirements. Establishing the project scope has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA project include risk assessments and the preparation of an integrated project schedule

  3. 40 CFR 265.112 - Closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and (5) A detailed...

  4. 40 CFR 264.112 - Closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... residues and contaminated containment system components, equipment, structures, and soils during partial... contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standard; and (5) A detailed...

  5. Plan-Belief Revision in Jason

    DEFF Research Database (Denmark)

    Jensen, Andreas Schmidt; Villadsen, Jørgen

    2015-01-01

    When information is shared between agents of unknown reliability, it is possible that their belief bases become inconsistent. In such cases, the belief base must be revised to restore consistency, so that the agent is able to reason. In some cases the inconsistent information may be due to use of...... of incorrect plans. We extend work by Alechina et al. to revise belief bases in which plans can be dynamically added and removed. We present an implementation of the algorithm in the AgentSpeak implementation Jason....

  6. Revised Severe Accident Research Program plan, FY 1990--1992

    International Nuclear Information System (INIS)

    1989-08-01

    For the past 10 years, since the Three Mile Island accident, the NRC has sponsored an active research program on light-water-reactor severe accidents as part of a multi-faceted approach to reactor safety. This report describes the revised Severe Accident Research Program (SARP) and how the revisions are designed to provide confirmatory information and technical support to the NRC staff in implementing the staff's Integration Plan for Closure of Severe Accident Issues as described in SECY-88-147. The revised SARP addresses both the near-term research directed at providing a technical basis upon which decisions on important containment performance issues can be made and the long-term research needed to confirm and refine our understanding of severe accidents. In developing this plan, the staff recognized that the overall goal is to reduce the uncertainties in the source term sufficiently to enable the staff to make regulatory decisions on severe accident issues. However, the staff also recognized that for some issues it may not be practical to attempt to further reduce uncertainties, and some regulatory decisions or conclusions will have to be made with full awareness of existing uncertainties. 2 figs., 1 tab

  7. 216-B-3 expansion ponds closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.

  8. 216-B-3 expansion ponds closure plan

    International Nuclear Information System (INIS)

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA

  9. The 300 area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1996-01-01

    The 300 Area Waste Acid Treatment System (WATS) is located within operable units 300-FF-2 (source) and 300-FF-5 (groundwater), as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) . Operable units 300-FF-2 and 300-FF-5 are scheduled to be remediated using the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation/Feasibility Study (RI/FS) process. Thus, any remediation of the 300 Area WATS with respect to contaminants not produced by those facilities and soils and groundwater will be deferred to the CERCLA RI/FS process. Final closure activities will be completed in 3 phases and certified in accordance with the 300 Area WATS closure plan by the Washington State Department of Ecology (Ecology) and the U.S. Environmental Protection Agency (EPA). It is anticipated that the 300 Area WATS closure would take 2 years to complete

  10. Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge

  11. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  12. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  13. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  14. DWPF Development Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Holtzscheiter, E.W.

    1994-05-09

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ``DWPF Process Development Systems.`` To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant.

  15. DWPF Development Plan. Revision 1

    International Nuclear Information System (INIS)

    Holtzscheiter, E.W.

    1994-01-01

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ''DWPF Process Development Systems.'' To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant

  16. State Environmental Policy Act (SEPA) Environmental Checklist Form 216-B-3 Expansion Ponds Closure Plan

    International Nuclear Information System (INIS)

    1993-12-01

    The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites

  17. 324 Building REC and HLV Tank Closure Plan

    International Nuclear Information System (INIS)

    Becker-Khaleel, B.; Schlick, K.

    1995-12-01

    This closure plan describes the activities necessary to close the 324 Radiochemical Engineering Cells (REC) and High-Level Vault (HLV) in accordance with the Washington State Dangerous Waste regulations. To provide a complete description of the activities required, the closure plan relies on information contained in the 324 Building B-Cell Safety Cleanout Project (BCCP) plans, the 324 Building REC HLV Interim Waste Management Plan (IWMP), the Project Management Plan for Nuclear Facilities Management 300 Area Compliance Program, and the 324 High Level Vault Interim Removal Action Project (project management plan [PMP]). The IWMP addresses the management of mixed waste in accordance with state and federal hazardous waste regulations. It provides a strategy for managing high-activity mixed waste in compliance with Resource Conservation and Recovery Act (RCRA) requirements or provides for an alternative management approach for the waste. The BCCP outlines the past, present, and future activities necessary for removing from B-Cell the solid waste, including mixed waste generated as a result of historical research and development (R ampersand D) activities conducted in the cell. The BCCP also includes all records and project files associated with the B-Cell cleanout. This information is referenced throughout the closure plan. The PMP sets forth the plans, organization, and systems that Pacific Northwest National Laboratory (PNNL) will use to direct and control the 324 High-Level Vault Interim Removal Action Project. This project will develop and implement a treatment strategy that will remove and stabilize the inventory of liquid waste from the 324 HLV tanks. The PMP also provides for flushing and sampling the flush solution

  18. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Science.gov (United States)

    2010-07-01

    ... mail. In addition, for facilities without approved post-closure plans, it must also be provided during... requirements. At the end of the specified period of suspension, the Regional Ad-min-is-tra-tor would then...

  19. Underground storage tank 431-D1U1, Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mancieri, S.

    1993-09-01

    This document contains information about the decommissioning of Tank 431-D1U1. This tank was installed in 1965 for diesel fuel storage. This tank will remain in active usage until closure procedures begin. Soils and ground water around the tank will be sampled to check for leakage. Appendices include; proof of proper training for workers, health and safety briefing record, task hazard analysis summary, and emergency plans.

  20. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed

  1. 2727-S Nonradioactive Dangerous Waste Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    Wilczek, T.A.; Laws, J.R.; Izatt, R.D.

    1992-01-01

    This closure plan describes the activities for final closure of the 2727-S Nonradioactive Dangerous Waste Storage (NRDWS) Facility at the Hanford Site. The 2727-S NRDWS Facility provided container storage for nonradioactive dangerous and extremely hazardous wastes generated in the research and development laboratories, process operations, and maintenance and transportation functions throughout the Hanford Site. Storage operations began at the 2727-S NRDWS Facility March 14, 1983, and continued until December 30, 1986, when the last shipment of materials from the facility took place. These storage operations have been moved to the new 616 NRDWS Facility, which is an interim status unit located between the 200 East and 200 West Areas of the Hanford Site

  2. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  3. RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-04-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. In January 1993, the Closure Plan was revised to include inspection and maintenance criteria and to reflect that future monitoring and remediation would be conducted as part of the ongoing Comprehensive Environmental Response, Compensation, and Liability Act activities at the Oak Ridge Y-12 Plant. This Closure Plan revision is intended to reflect the placement of the Kerr Hollow Quarry debris at the Walk-In Pits, revise the closure dates, and acknowledge that the disposition of a monitoring well within the closure site cannot be verified

  4. 303-K Radioactive Mixed-Waste Storage Facility closure plan

    International Nuclear Information System (INIS)

    1991-11-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors chemical-separation systems, and related facilities used for the production o special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 303-K Radioactive Mixed-Waste Storage Facility (303-K Facility) has been used since 1943 to store various radioactive,and dangerous process materials and wastes generated by the fuel manufacturing processes in the 300 Area. The mixed wastes are stored in US Department of Transportation (DOT)-specification containers (DOT 1988). The north end of the building was used for storage of containers of liquid waste and the outside storage areas were used for containers of solid waste. Because only the north end of the building was used, this plan does not include the southern end of the building. This closure plan presents a description of the facility, the history of materials and wastes managed, and a description of the procedures that will be followed to chose the 303-K Facility as a greater than 90-day storage facility. The strategy for closure of the 303-K Facility is presented in Chapter 6.0

  5. Closure Plan for the E-Area Low-Level Waste Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.R.

    2000-10-30

    A closure plan has been developed to comply with the applicable requirements of the U.S. Department of Energy Order 435.2 Manual and Guidance. The plan is organized according to the specifications of the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans.

  6. Closure Plan for the E-Area Low-Level Waste Facility

    International Nuclear Information System (INIS)

    Cook, J.R.

    2000-01-01

    A closure plan has been developed to comply with the applicable requirements of the U.S. Department of Energy Order 435.2 Manual and Guidance. The plan is organized according to the specifications of the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans

  7. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs)

  8. 300 Area Process Trenches Modified Closure/Postclosure Plan

    International Nuclear Information System (INIS)

    1997-09-01

    This chapter provides a brief summary of the contents of each chapter of this plan for the closure of the 300 Area Process Trenches (300 APT) treatment, storage, and/or disposal unit. It also provides background information for this unit and discusses how its closure will be integrated with the remedial action for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 300- FF-1 Operable Unit. The 300 APT is located within the 300 Area of the Hanford Site. This area contained reactor fuel fabrication facilities and research and development laboratories. The 300 APT was constructed and began operations in 1975 as the 316-5 Process Trenches. Effluent was discharged to the trenches by way of the 300 Area process sewer system, which has been the sole source of effluent for the 300 APT. The 316-5 Process Trenches gained Resource Conservation and Recovery Act of 1976 (RCRA) interim status as the 300 APT TSD unit on November 11, 1985. The unit has been administratively closed to discharges of dangerous waste since 1985

  9. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  10. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  11. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells

  12. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  13. Transuranic Storage Area (TSA)-2 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Lodman, D.W.; Spry, M.J.; Nolte, E.P.; Barry, G.A.

    1992-11-01

    This document describes the proposed plans for closure of the Transuranic Storage Area (TSA)-2 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. Future plans for the unit include incorporating the earthen-covered portion of the TSA-2 pad into a TSA retrieval enclosure along with the TSA-1 and TSAR pads, and closure of the portion of the TSA-2 pad under the Air Support Weather Shield (ASWS-2). This plan addresses closure of the ASWS-2 by decontaminating structures and equipment that may have contacted the waste. Sufficient sampling and documentation of all closure activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  14. 105-DR Large Sodium Fire Facility closure plan

    International Nuclear Information System (INIS)

    1993-05-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, and activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950's and is located in the 100-D Area of the Hanford Site. The building housed the 105-DR defense reactor, which was shut down in 1964. The LSFF was initially used only for engineering-scale alkali metal reaction studies. In addition, the Fusion Safety Support Studies program sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium lead compounds. The facility has also been used to store and treat alkali metal waste, therefore the LSFF is subject to the regulatory requirements for the storage and treatment of dangerous waste. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610. This closure plan presents a description of the facility, the history of waste managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected

  15. DWPF waste form compliance plan (Draft Revision)

    International Nuclear Information System (INIS)

    Plodinec, M.J.; Marra, S.L.

    1991-01-01

    The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970's, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would considerably precede licensing of a repository, instituted a Waste Acceptance Process to ensure that these canistered waste forms would be acceptable for eventual disposal at a federal repository. This report is a revision of the DWPF compliance plan

  16. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Mark Burmeister

    2007-01-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met as specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs)

  17. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  18. Underground storage tank 291-D1U1: Closure plan

    Energy Technology Data Exchange (ETDEWEB)

    Mancieri, S.; Giuntoli, N.

    1993-09-01

    The 291-D1U1 tank system was installed in 1983 on the north side of Building 291. It supplies diesel fuel to the Building 291 emergency generator and air compressor. The emergency generator and air compressor are located southwest and southeast, respectively, of the tank (see Appendix B, Figure 2). The tank system consists of a single-walled, 2,000- gallon, fiberglass tank and a fuel pump system, fill pipe, vent pipe, electrical conduit, and fuel supply and return piping. The area to be excavated is paved with asphalt and concrete. It is not known whether a concrete anchor pad is associated with this tank. Additionally, this closure plan assumes that the diesel tank is below the fill pad. The emergency generator and air compressor for Building 291 and its associated UST, 291-D1U1, are currently in use. The generator and air compressor will be supplied by a temporary above-ground fuel tank prior to the removal of 291-D1U1. An above-ground fuel tank will be installed as a permanent replacement for 291-D1U1. The system was registered with the State Water Resources Control Board on June 27, 1984, as 291-41D and has subsequently been renamed 291-D1U1. Figure 1 (see Appendix B) shows the location of the 291-D1U1 tank system in relation to the Lawrence Livermore National Laboratory (LLNL). Figure 2 (see Appendix B) shows the 291-D1U1 tank system in relation to Building 291. Figure 3 (see Appendix B) shows a plan view of the 291-D1U1 tank system.

  19. Carlsbad Area Office strategic plan, March 1995. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This edition of the Carlsbad Area Office Strategic Plan captures the US Department of Energy's (DOE's) new focus, and supersedes the edition issued previously (DOE, 1993a). This revision reflects: a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on establishment of standardized transuranic waste characterization and acceptance criteria for disposal facilities

  20. Corporate strategy and viable future land use: Planning for closure from the outset of mining

    International Nuclear Information System (INIS)

    Warhurst, A.

    2000-01-01

    This paper provides an overview of the environmental impact of mining on viable future land use and underlines the imperative of improved environmental management and closure planning. It argues that pollution prevention, through planning for closure, can lead to cost-effective strategies for sustainable minerals development and viable future land use. This seems to be most true for greenfield sites since, generally, the earlier closure planning and pollution prevention is built into a project, the more cost-effective and environmentally benign closure will be. Further, for greenfield sites, pollution prevention techniques can be employed from the outset, at the stages of exploration and mine development, and then monitored and improved through the operation stage to closure, and can be kept in place to manage future land use. The paper discusses how global changes in the industry, following the liberalisation of investment regimes, and mergers and strategic alliances between key firms, has, by virtue of the diffusion of new technology, led to further opportunities to prevent pollution and optimise future land use through planning for closure from the outset. The objectives and components of closure plans are also reviewed as the paper draws on case studies to highlight some of the possible constraints and challenges to pollution prevention that may be faced at the level of both public policy and corporate strategy. The article concludes by suggesting a forward-looking approach to integrated environmental management and viable future land-use planning based on a dynamic model for environmental management. (author)

  1. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  2. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  3. Plutonium Finishing Plan (PFP) Treatment and Storage Unit Interim Status Closure Plan

    International Nuclear Information System (INIS)

    PRIGNANO, A.L.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) Treatment and Storage Unit. The PFP Treatment and Storage Unit is located within the 234-52 Building in the 200 West Area of the Hanford Facility. Although this document is prepared based upon Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the PFP Treatment and Storage Unit manages transuranic mixed (TRUM) waste, there are many controls placed on management of the waste. Based on the many controls placed on management of TRUM waste, releases of TRUM waste are not anticipated to occur in the PFP Treatment and Storage Unit. Because the intention is to clean close the PFP Treatment and Storage Unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. The PFP Treatment and Storage Unit will be operated to immobilize and/or repackage plutonium-bearing waste in a glovebox process. The waste to be processed is in a solid physical state (chunks and coarse powder) and will be sealed into and out of the glovebox in closed containers. The containers of immobilized waste will be stored in the glovebox and in additional permitted storage locations at PFP. The waste will be managed to minimize the potential for spills outside the glovebox, and to preclude spills from reaching soil. Containment surfaces will be maintained to ensure

  4. Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Burmeister and Patrick Matthews

    2012-11-01

    The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.

  5. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  6. 10 CFR 63.161 - Emergency plan for the geologic repository operations area through permanent closure.

    Science.gov (United States)

    2010-01-01

    ... Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... may occur at the geologic repository operations area, at any time before permanent closure and...

  7. Closure Report for Corrective Action Unit 124, Storage Tanks, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2008-01-01

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 124, Storage Tanks, Nevada Test Site (NTS), Nevada. This report complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended January 2007). This CR provides documentation and justification for the closure of CAU 124 without further corrective action. This justification is based on process knowledge and the results of the investigative activities conducted in accordance with the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 124: Storage Tanks, Nevada Test Site, Nevada (NNSA/NSO, 2007). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. Therefore, this information will not be repeated in this CR.

  8. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  9. 42 CFR 456.523 - Revised UR plan.

    Science.gov (United States)

    2010-10-01

    ... control over the utilization of services; and (2) Conducts reviews in a way that improves the quality of...) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Review Plans: FFP, Waivers, and Variances for Hospitals and Mental Hospitals Ur Plan: Remote Facility Variances from Time Requirements § 456.523 Revised...

  10. Planning Facilities for Athletics, Physical Education and Recreation. Revised.

    Science.gov (United States)

    American Alliance for Health, Physical Education, Recreation and Dance (AAHPERD).

    This revised edition includes new material recommended by a panel of experts in the field of recreational planning. The following topics are covered: (1) the planning process; (2) indoor facilities; (3) outdoor facilities; (4) indoor and outdoor swimming pools; (5) encapsulated spaces and stadiums; (6) service areas; (7) recreation and park…

  11. Shuttle Planning for Link Closures in Urban Public Transport Networks

    NARCIS (Netherlands)

    van der Hurk, E.; Koutsopoulos, H.; Wilson, N.H.M.; Kroon, L.G.; Maroti, G.

    2016-01-01

    Urban public transport systems must periodically close certain links for maintenance, which can have significant effects on the service provided to passengers. In practice, the effects of closures are mitigated by replacing the closed links with a simple shuttle service. However, alternative shuttle

  12. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  13. Transuranic Storage Area (TSA)-3 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Barry, G.A.; Lodman, D.L.; Spry, M.J.; Poor, K.J.

    1992-11-01

    This document describes the proposed plan for closure of the Transuranic Storage Area (TSA)-3 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. The unit will be closed by decontaminating structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  14. Radiation protection planning and management during revision

    International Nuclear Information System (INIS)

    Gewehr, K.

    1984-01-01

    During the operation of nuclear power plants it is normally possible for the in-house personnel to take care of arising radiation protection problems. However, in the comparatively short revision phases, the duties of radiation protection become much more varied. Additional trained radiation protection crews are needed at short notice. This is also the time in which the largest contributions are made to the annual cumulated doses of the personnel. Recent guidelines and rules trying to reduce the radiation exposure of personnel concentrate on this very point. The article outlines the radiation protection activities performed by the service personnel in the course of a steam generator check. (orig.) [de

  15. Closure plan for the M-Area settling basin and vicinity at the Savannah River Plant

    International Nuclear Information System (INIS)

    Colven, W.P.; Pickett, J.B.

    1985-07-01

    The areas addressed in this closure plan include a process sewer line, surface impoundment (settling basin), overflow ditch, seepage area, and a Carolina Bay known as Lost Lake. Since it is proposed that the basin and vicinity be closed with the hazardous wastes placed and stabilized in the basin, it will be closed pursuant to regulations for closing a hazardous waste landfill. No free liquids will remain in the impoundment after closure is completed

  16. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    International Nuclear Information System (INIS)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process

  17. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.

  18. 77 FR 60319 - Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a...

    Science.gov (United States)

    2012-10-03

    ...-XC099 Harbor Porpoise Take Reduction Plan; Coastal Gulf of Maine Closure Area Established With a... Atmospheric Administration (NOAA), Commerce. ACTION: Establishment of the Coastal Gulf of Maine Closure Area... Service (NMFS) announces the establishment of the Coastal Gulf of Maine Closure Area under the Harbor...

  19. SSC San Diego Strategic Plan. Revision 2

    National Research Council Canada - National Science Library

    2000-01-01

    .... As an organization, we believe that strategic planning provides a critically needed context for adopting dynamic, agile processes to better use our corporate resources and meet our customers' needs...

  20. Shuttle Planning for Link Closures in Urban Public Transport Networks

    DEFF Research Database (Denmark)

    van der Hurk, Evelien; Koutsopoulos, Haris N.; Wilson, Nigel

    2016-01-01

    Urban public transport systems must periodically close certain links for maintenance, which can have significant effects on the service provided to passengers. In practice, the effects of closures are mitigated by replacing the closed links with a simple shuttle service. However, alternative...... cost, which includes transfers and frequency-dependent waiting time costs. This model is applied to a shuttle design problem based on a real-world case study of the Massachusetts Bay Transportation Authority network of Boston, Massachusetts. The results show that additional shuttle routes can reduce...

  1. WASTE CERTIFICATION PROGRAM PLAN - REVISION 7

    International Nuclear Information System (INIS)

    MORGAN, LK

    2002-01-01

    The primary changes that have been made to this revision reflect the relocation of the Waste Certification Official (WCO) organizationally from the Quality Services Division (QSD) into the Laboratory Waste Services (LWS) Organization. Additionally, the responsibilities for program oversight have been differentiated between the QSD and LWS. The intent of this effort is to ensure that those oversight functions, which properly belonged to the WCO, moved with that function; but retain an independent oversight function outside of the LWS Organization ensuring the potential for introduction of organizational bias, regarding programmatic and technical issues, is minimized. The Waste Certification Program (WCP) itself has been modified to allow the waste certification function to be performed by any of the personnel within the LWS Waste Acceptance/Certification functional area. However, a single individual may not perform both the technical waste acceptance review and the final certification review on the same 2109 data package. Those reviews must be performed by separate individuals in a peer review process. There will continue to be a designated WCO who will have lead programmatic responsibility for the WCP and will exercise overall program operational oversite as well as determine the overall requirements of the certification program. The quality assurance organization will perform independent, outside oversight to ensure that any organizational bias does not degrade the integrity of the waste certification process. The core elements of the previous WCP have been retained, however, the terms and process structure have been modified.. There are now two ''control points,'' (1) the data package enters the waste certification process with the signature of the Generator Interface/Generator Interface Equivalent (GI/GIE), (2) the package is ''certified'', thus exiting the process. The WCP contains three steps, (1) the technical review for waste acceptance, (2) a review of the

  2. Hydrogeologic investigations sampling plan: Revision 0

    International Nuclear Information System (INIS)

    1988-11-01

    The goal of this sampling plan is to identify and develop specific plans for those investigative actions necessary to: (1) characterize the hydrologic regime; (2) define the extent and impact of contamination; and (3) predict future contaminant migration for the Weldon Spring Site (WSS) and vicinity. The plan is part of the Weldon Spring Site Remedial Action Project (WSSRAP) sponsored by the US Department of Energy (DOE) and has been developed in accordance with US EPA Remedial Investigation (RI) and Data Quality Objective (DQO) guidelines. The plan consists of a sequence of activities including the evaluation of data, development of a conceptual model, identification of data uses and needs, and the design and implementation of a data collection program. Data will be obtained to: (1) confirm the presence or absence of contaminants; (2) define contaminant sources and modes of transport; (3) delineate extent of contaminant migration and predict future migration; and (4) provide information to support the evaluation and selection of remedial actions. 81 refs., 62 figs., 26 tabs

  3. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick

    2016-01-01

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage-transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is

  4. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2016-08-22

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. The purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is

  5. Fernald - Developing and Executing an Accelerated Closure Plan

    International Nuclear Information System (INIS)

    Nixon, D.A.

    2006-01-01

    In November 2000 the Department of Energy (DOE) and Fluor Fernald entered into a closure contract that incited Fluor Fernald to reduce the cost and schedule of the Fernald site cleanup. The contract established a target schedule and target cost and how Fluor Fernald performs against these targets determines the amount of fee the company earns. In response to these new challenges, Fluor Fernald developed a 13-part strategy to safely accelerate work and more efficiently utilize the available funding. Implementation of this strategy required a dramatic culture change at Fernald - from a 'government job mind set' to an entrepreneurial/commercial model. Fluor Fernald's strategy and culture change has proved to be successful as the company is on track to close the site ahead of the target schedule at a total project cost less than the target cost. The elements of Fluor Fernald's strategy and the lessons learned during implementation provide valuable information that could be utilized by other DOE sites that will be undergoing closure over the next decade. (authors)

  6. Hanford tanks initiative alternatives generation and analysis plan for AX tank farm closure basis

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1997-01-01

    The purpose of this document is: (1) to review the HTI Mission Analysis and related documents to determine their suitability for use in developing performance measures for AX Tank Farm closure, (2) to determine the completeness and representativeness of selected alternative closure scenarios, (3) to determine the completeness of current plans for development of tank end-state criteria, and (4) to analyze the activities that are necessary and sufficient to recommend the end-state criteria and performance measures for the AX Tank Farm and recommend activities not currently planned to support establishment of its end-state criteria

  7. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk- In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Subsequently, this plan was modified again and approved as Y/TS-395, Revised RCRA Closure Plan for the Bear Creek Burial Grounds (February 29, 1988). Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. The plan was presented to the state of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. This amended closure plan goes further to include inspection and maintenance criteria along with other details

  8. Land use-based landscape planning and restoration in mine closure areas.

    Science.gov (United States)

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  9. Land Use-Based Landscape Planning and Restoration in Mine Closure Areas

    Science.gov (United States)

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P.; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  10. Corrective action investigation plan: Cactus Spring Waste Trenches. Revision 2

    International Nuclear Information System (INIS)

    1997-02-01

    This Correction Action Investigation Plan (CAIP) contains environmental sample collection objectives and logic for the CAU No. 426, which includes the Cactus Spring Waste Trenches, CAS No. RG-08-001-RG-CS. The Cactus Spring Waste Trenches are located at the Tonopah Test Range (TTR) which is part of the Nellis Air Force Range, approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air. The purpose of this investigation is to generate sufficient data to establish the types of waste buried in the trenches, identify the presence and nature of contamination, determine the vertical extent of contaminant migration below the Cactus Spring Waste Trenches, and determine the appropriate course of action for the site. The potential courses of action for the site are clean closure, closure in place (with or without remediation), or no further action

  11. 76 FR 13511 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... approve revisions to the Virginia State Implementation Plan (SIP). The revisions recodify the open burning... approving these revisions to Virginia's open burning regulations in accordance with the requirements of the...

  12. The 4843 Alkali Metal Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-06-01

    The 4843 AMSF has been used primarily to provide a centralized building to receive and store dangerous and mixed alkali metal waste, including sodium and lithium, which has been generated at the Fast Flux Test Facility and at various other Hanford Site operations that used alkali metals. Most of the dangerous and mixed alkali metal waste received consists of retired equipment from liquid sodium processes. The unit continues to store material. In general, only solid alkali metal waste that is water reactive is stored at the 4843 AMSF. The 4843 AMSF will be closed in a manner consistent with Ecology guidelines and regulations (WAC 173-303-610). The general closure procedure is detailed as follows

  13. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  14. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  15. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  16. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick; Petrello, Jaclyn

    2016-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  17. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States); Petrello, Jaclyn [Navarro, Las Vegas, NV (United States)

    2016-03-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  18. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  19. Openings and closures in the environmental planning horizon

    DEFF Research Database (Denmark)

    Vasström, Mikaela Lise

    boundary setting, risk assessment, and interest negotiation. Participatory nature protection planning is not only a question of procedural legitimacy, but also a matter of deliberating different nature-society rationalities in order to improve the substantial ground for environmental planning trajectories......Sustainability is one of the most pressing concerns in our modern society. Nature protection or environmental planning can be understood as one societal answer to some of the ecological challenges of our “developed” society to secure particular nature values and areas. The regulation of nature......, however, also affects socio-economic and cultural aspects, and creates contested claims between different types of nature values and interests. Current environmental planning has proved to generate conflict in relation to a wide variety of knowledge, steering, interest, and value facets between national...

  20. 9 CFR 108.6 - Revision of plot plans, blueprints, and legends.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Revision of plot plans, blueprints... FACILITY REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.6 Revision of plot plans, blueprints, and legends... changes affecting the workflow are to be made. The licensee shall: (a) Prepare revised plot plans...

  1. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  2. Closure Report for Corrective Action Unit 566: EMAD Compound, Nevada National Security Site, Nevada with ROTC-1, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2011-06-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 566: EMAD Compound, Nevada National Security Site, Nevada. Corrective Action Unit 566 comprises Corrective Action Site (CAS) 25-99-20, EMAD Compound, located within Area 25 of the Nevada National Security Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CAU 566 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 566 issued by the Nevada Division of Environmental Protection. From October 2010 through May 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 566: EMAD Compound, Nevada National Security Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 566. Assessment of the data from collected soil samples, and from radiological and visual surveys of the site, indicates the FALs were exceeded for polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and radioactivity. Corrective actions were implemented to remove the following: • Radiologically contaminated soil assumed greater than FAL at two locations • Radiologically contaminated soil assumed greater than FAL with

  3. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2007-09-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  4. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2007-01-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  5. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  6. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene

    2018-03-01

    The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR

  7. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  8. 77 FR 24148 - Revision to the Hawaii State Implementation Plan, Minor New Source Review Program

    Science.gov (United States)

    2012-04-23

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0213; FRL-9661-6] Revision to the Hawaii State Implementation Plan, Minor New Source Review Program AGENCY: Environmental Protection Agency... final action to approve revisions to the Hawaii State Implementation Plan (SIP). These revisions would...

  9. 76 FR 13569 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia. The revisions recodify the open... . C. Mail: EPA-R03-OAR-2010-0902, Harold A. Frankford, Air Protection Division, Mailcode 3AP00, U.S...

  10. HWMA/RCRA Closure Plan for the TRA Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System

    International Nuclear Information System (INIS)

    K. Winterholler

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for the Test Reactor Area Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System, located in Building TRA-641 at the Reactor Technology Complex (RTC), Idaho National Laboratory Site, to meet a further milestone established under the Voluntary Consent Order SITE-TANK-005 Action Plan for Tank System TRA-009. The tank system to be closed is identified as VCO-SITE-TANK-005 Tank System TRA-009. This closure plan presents the closure performance standards and methods for achieving those standards

  11. US Nuclear Regulatory Commission Human Factors Program Plan. Revision 1

    International Nuclear Information System (INIS)

    1984-09-01

    The purpose of the NRC Human Factors Program Plan (NUREG-0985) is to ensure that proper consideration is given to human factors in the design, operation, and maintenance of nuclear facilities. This revised plan addresses nuclear power plants (NPPs) and describes (1) the technical assistance and research activities planned to provide the technical bases for the resolution of the remaining human factors related tasks described in NUREG-0660, THE NRC Action Plan developed as a result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the additional human factors efforts identified during implementation of the Action Plan that should receive NRC attention; (3) conduct of developmental activities specified in NUREG-0985 during FY-83; and (4) the impact of Section 306 of the Nuclear Waste Policy Act of 1982, PL 97-425. The plan represents a systematic and comprehensive approach for addressing human factors concerns important to NPP safety in the FY-84 through FY-86 time frame

  12. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  13. Closure Report for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2010-09-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location • Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are

  14. Mud Pit Risk-Based Closure Strategy Report, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Brain Hoenes

    2004-08-01

    This report presents the findings of the human and ecological risk assessment for the NTS mud pits. The risk assessment utilizes data from 52 of the 270 NTS mud pits in conjunction with corroborative data from 87 other DOE mud pits associated with nuclear testing (at locations on the NTS, in the western United States, and Alaska) as well as relevant process knowledge. Based on the risk assessment findings, the report provides a strategy for further evaluation, characterization, and closure of all 270 NTS mud pit CASs using the Streamlined Approach for Environmental Restoration (SAFER).

  15. Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alvarado, Juan; Matthews, Patrick

    2018-05-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: • CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. • CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. • CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. • CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.

  16. Mixed Waste Management Facility, revised FY94 Plan

    International Nuclear Information System (INIS)

    Streit, R.

    1994-01-01

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94

  17. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents of concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern

  18. State Environmental Policy Act (SEPA) Checklist for the 105-DR Large Sodium Fire Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950's and is located in the 100-D Area of the Hanford Site. The building housed the DR defense reactor, which was shut down in 1964. The LSFF is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Clean closure is the proposed method of closure for the LSFF. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989). This closure plan presents a description of the facility, the history of wastes managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected.

  19. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents of concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.

  20. Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Kauss, Mark

    2011-01-01

    November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: (1) Determine whether contaminants of concern (COCs) are present; and (2) If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: (1) At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. (2) At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed

  1. Remedial action work plan for the Colonie site. Revision 1

    International Nuclear Information System (INIS)

    1985-08-01

    The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab

  2. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill.

  3. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill

  4. NRC drug-free workplace plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ``NRC Drug-Free Workplace Plan,`` supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance.

  5. NRC drug-free workplace plan. Revision 1

    International Nuclear Information System (INIS)

    1997-11-01

    On September 15, 1986, President Reagan signed Executive Order 12564, establishing the goal of a Drug-Free Federal Workplace. The Order made it a condition of employment that all Federal employees refrain from using illegal drugs on or off duty. On July 11, 1987, Congress passed legislation affecting implementation of the Executive Order under Section 503 of the Supplemental Appropriations Act of 1987, Public Law 100-71 (the Act). The Nuclear Regulatory Commission first issued the NRC Drug Testing Plan to set forth objectives, policies, procedures, and implementation guidelines to achieve a drug-free Federal workplace, consistent with the Executive Order and Section 503 of the Act. Revision 1, titled, ''NRC Drug-Free Workplace Plan,'' supersedes the previous version and its supplements and incorporates changes to reflect current guidance from the Department of Justice, the Department of Health and Human Services, as well as other guidance

  6. Revision of construction plan for advanced thermal demonstration reactor

    International Nuclear Information System (INIS)

    1996-01-01

    The Federation of Electric Power Companies demanded the revision of the construction plan for the advanced thermal demonstration reactor, which is included in the 'Long term plan on the research, development and utilization of atomic energy' decided by the Atomic Energy Commission in 1994, for economical reason. The Atomic Energy Commission carried out the deliberation on this demand. It was found that the cost of construction increases to 580 billion yen, and the cost of electric power generation increases three times as high as that of LWRs. The role as the reactor that utilizes MOX fuel can be substituted by LWRs. The relation of trust with the local town must be considered. In view of these circumstances, it is judged that the stoppage of the construction plan is appropriate. It is necessary to investigate the substitute plan for the stoppage, and the viewpoints of investigating the substitute plan, the examination of the advanced BWR with all MOX fuel core and the method of advancing its construction are considered. On the research and development related to advanced thermal reactors, the research and development contributing to the advance of nuclear fuel recycling are advanced, and the prototype reactor 'Fugen' is utilized. (K.I.)

  7. High-Level Waste Systems Plan. Revision 7 (U)

    International Nuclear Information System (INIS)

    Brooke, J.N.; Gregory, M.V.; Paul, P.; Taylor, G.; Wise, F.E.; Davis, N.R.; Wells, M.N.

    1996-10-01

    This revision of the High-Level Waste (HLW) System Plan aligns SRS HLW program planning with the DOE Savannah River (DOE-SR) Ten Year Plan (QC-96-0005, Draft 8/6), which was issued in July 1996. The objective of the Ten Year Plan is to complete cleanup at most nuclear sites within the next ten years. The two key principles of the Ten Year Plan are to accelerate the reduction of the most urgent risks to human health and the environment and to reduce mortgage costs. Accordingly, this System Plan describes the HLW program that will remove HLW from all 24 old-style tanks, and close 20 of those tanks, by 2006 with vitrification of all HLW by 2018. To achieve these goals, the DWPF canister production rate is projected to climb to 300 canisters per year starting in FY06, and remain at that rate through the end of the program in FY18, (Compare that to past System Plans, in which DWPF production peaked at 200 canisters per year, and the program did not complete until 2026.) An additional $247M (FY98 dollars) must be made available as requested over the ten year planning period, including a one-time $10M to enhance Late Wash attainment. If appropriate resources are made available, facility attainment issues are resolved and regulatory support is sufficient, then completion of the HLW program in 2018 would achieve a $3.3 billion cost savings to DOE, versus the cost of completing the program in 2026. Facility status information is current as of October 31, 1996

  8. 77 FR 76065 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm...

    Science.gov (United States)

    2012-12-26

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Kendall Warm Springs Dace... revised recovery plan for the Kendall Warm Springs dace (Rhinichthys osculus thermalis). This species is... recovery plan. The Kendall Warm Springs dace (Rhinichthys osculus thermalis), found only in one location in...

  9. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-03-22

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  10. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    International Nuclear Information System (INIS)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-01-01

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE's requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information

  11. Planning for the closure of uncontrolled landfills in Turkey to reduce environmental impacts.

    Science.gov (United States)

    Ergene Şentürk, Didar; Alp, Emre

    2016-11-01

    Landfilling is the most preferred solid waste disposal method in Turkey owing to both economic and technical reasons. However, beside the sanitary landfills there are also hundreds of uncontrolled waste sites located throughout Turkey, which are often left either abandoned or burning. Because there is a lack of legislative guidelines governing the closure and rehabilitation of these dumpsites, the municipalities that are responsible for waste management do not initiate the proactive strategies required for the closure of these sites. In this study, a method based on a multi-criteria analysis is conducted for different dumpsites in Turkey to evaluate the level of negative impacts on the environment. This method is based on the use of environmental indices for a quantitative assessment of the landfills, such as environmental interaction between the source and the receptors, environmental values of the receptors, and operational conditions. It was possible to assess the robustness of the proposed methodology since the pre- and post-groundwater quality monitoring data was available from the study sites that were closed and rehabilitated in 2014. The results of this study show that the method based on a multi-criteria analysis is an effective tool while in the preliminary planning stages of closure and rehabilitation activities of uncontrolled waste landfills. © The Author(s) 2016.

  12. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-05-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination.

  13. Soil sampling and analysis plan for the 3718-F Alkali Metal Treatment and Storage Facility closure activities

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    Amendment V.13.B.b to the approved closure plan (DOE-RL 1995a) requires that a soil sampling and analysis plan be prepared and submitted to the Washington State Department of Ecology (Ecology) for review and approval. Amendment V.13.B.c requires that a diagram of the 3718-F Alkali Metal Treatment and Storage Facility unit (the treatment, storage, and disposal [TSD] unit) boundary that is to be closed, including the maximum extent of operation, be prepared and submitted as part is of the soil sampling and analysis plan. This document describes the sampling and analysis that is to be performed in response to these requirements and amends the closure plan. Specifically, this document supersedes Section 6.2, lines 43--46, and Section 7.3.6 of the closure plan. Results from the analysis will be compared to cleanup levels identified in the closure plan. These cleanup levels will be established using residential exposure assumptions in accordance with the Model Toxics Control Act (MTCA) Cleanup Regulation (Washington Administrative Code [WAC] 173-340) as required in Amendment V.13.B.I. Results of all sampling, including the raw analytical data, a summary of analytical results, a data validation package, and a narrative summary with conclusions will be provided to Ecology as specified in Amendment V.13.B.e. The results and process used to collect and analyze the soil samples will be certified by a licensed professional engineer. These results and a certificate of closure for the balance of the TSD unit, as outlined in Chapter 7.0 of the approved closure plan (storage shed, concrete pad, burn building, scrubber, and reaction tanks), will provide the basis for a closure determination

  14. Closure plan for the Test Area North-726 chromate water storage and Test Area North-726A chromate treatment units

    International Nuclear Information System (INIS)

    Smith, P.J.; Van Brunt, K.M.

    1992-11-01

    This document describes the proposed plan for closure of the Test Area North-726 chromate water storage and Test Area North-726A chromate treatment units at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act interim status closure requirements. The location, size, capacity, and history of the units are described, and their current status is discussed. The units will be closed by treating remaining waste in storage, followed by thorough decontamination of the systems. Sufficient sampling and analysis, and documentation of all activities will be performed to demonstrate clean closure

  15. Resource Conservation and Recovery Act closure plan for the Intermediate-Level Transuranic Storage Facility mixed waste container storage units

    International Nuclear Information System (INIS)

    Nolte, E.P.; Spry, M.J.; Stanisich, S.N.

    1992-11-01

    This document describes the proposed plan for clean closure of the Intermediate-Level Transuranic Storage Facility mixed waste container storage units at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. Descriptions of the location, size, capacity, history, and current status of the units are included. The units will be closed by removing waste containers in storage, and decontamination structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  16. 40 CFR 256.03 - State plan submission, adoption, and revision.

    Science.gov (United States)

    2010-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements, Definitions § 256.03 State plan submission, adoption, and revision. (a) To be...

  17. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  18. 78 FR 61329 - Revision of the Land Management Plan for the Nantahala and Pisgah National Forests

    Science.gov (United States)

    2013-10-03

    .... Individuals who use telecommunication devices for the deaf (TDD) may call the Federal Information Relay.... More information on the planning process can also be found on the Nantahala and Pisgah Plan Revision... Forest Planning Rule (36 CFR Part 219), the planning process encompases three-stages: Assessment, plan...

  19. 200 area liquid effluent facility quality assurance program plan. Revision 1

    International Nuclear Information System (INIS)

    Sullivan, N.J.

    1995-01-01

    Direct revision of Supporting Document WHC-SD-LEF-QAPP-001, Rev. 0. 200 Area Liquid Effluent Facilities Quality Assurance Program Plan. Incorporates changes to references in tables. Revises test to incorporate WHC-SD-LEF-CSCM-001, Computer Software Configuration Management Plan for 200 East/West Liquid Effluent Facilities

  20. Simplifying documentation while approaching site closure: integrated health and safety plans as documented safety analysis

    International Nuclear Information System (INIS)

    Brown, Tulanda

    2003-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). By isolating any remediation activities that deal with Enriched Restricted Materials, the SBRs and PRs assure that the hazard categories of former nuclear facilities undergoing remediation remain less than Nuclear. These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 150 structures, including six major nuclear production plants. This paper presents the FCP method for maintaining safety basis documentation, using the D and D I-HASP as an example

  1. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  2. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  3. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  4. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973 to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.

  5. 324 Building radiochemical engineering cells, high-level vault, low-level vault, and associated areas closure plan

    International Nuclear Information System (INIS)

    Barnett, J.M.

    1998-01-01

    The Hanford Site, located adjacent to and north of Richland, Washington, is operated by the US Department of Energy, Richland Operations Office (RL). The 324 Building is located in the 300 Area of the Hanford Site. The 324 Building was constructed in the 1960s to support materials and chemical process research and development activities ranging from laboratory/bench-scale studies to full engineering-scale pilot plant demonstrations. In the mid-1990s, it was determined that dangerous waste and waste residues were being stored for greater than 90 days in the 324 Building Radiochemical Engineering Cells (REC) and in the High-Level Vault/Low-Level Vault (HLV/LLV) tanks. [These areas are not Resource Conservation and Recovery Act of 1976 (RCRA) permitted portions of the 324 Building.] Through the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-89, agreement was reached to close the nonpermitted RCRA unit in the 324 Building. This closure plan, managed under TPA Milestone M-20-55, addresses the identified building areas targeted by the Tri-Party Agreement and provides commitments to achieve the highest degree of compliance practicable, given the special technical difficulties of managing mixed waste that contains high-activity radioactive materials, and the physical limitations of working remotely in the areas within the subject closure unit. This closure plan is divided into nine chapters. Chapter 1.0 provides the introduction, historical perspective, 324 Building history and current mission, and the regulatory basis and strategy for managing the closure unit. Chapters 2.0, 3.0, 4.0, and 5.0 discuss the detailed facility description, process information, waste characteristics, and groundwater monitoring respectively. Chapter 6.0 deals with the closure strategy and performance standard, including the closure activities for the B-Cell, D-Cell, HLV, LLV; piping and miscellaneous associated building areas. Chapter 7.0 addresses the

  6. The development and revision of the Federal Radiological Emergency Response Plan

    International Nuclear Information System (INIS)

    Gant, K.S.; Adler, M.V.; Wolff, W.F.

    1989-01-01

    Since 1985, federal agencies have been using the Federal Radiological Emergency Response Plan (FRERP) in exercises and real events. This experience and the development of other emergency response guidance (e.g., National System for Emergency Coordination) are fueling current efforts to review and revise the FRERP to reflect what the agencies have learned since the FRERP was published. Revision efforts are concentrating on clarifying the plan and addressing deficiencies. No major changes are expected in the general structure of the federal response nor should states need to revise their plans because of these modifications. 5 refs

  7. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  8. 76 FR 32321 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... approve revisions to the Pennsylvania State Implementation Plan (SIP). The revision consists of a change... prior SIP-approved I/M program to change the duration of the timing of quality assurance audits...

  9. 75 FR 27647 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Emission...

    Science.gov (United States)

    2010-05-18

    ... severable portions of two revisions to the Texas State Implementation Plan (SIP) submitted by the State of... further clarify procedures for using emission protocols and to update the approved list of emission credit... to recently recodified 30 TAC Chapter 117 provisions. EPA has determined that these SIP revisions...

  10. 75 FR 15391 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision to Control...

    Science.gov (United States)

    2010-03-29

    ... to control volatile organic compound (VOC) emissions from storage tanks, transport vessels and marine... Promulgation of Air Quality Implementation Plans; Texas; Revision to Control Volatile Organic Compound.... Specifically, this revision subjects owners or operators of VOC storage tanks, transport vessels, and marine...

  11. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0987; FRL-9617-5] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  12. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0394; FRL-9845-4] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  13. 78 FR 37176 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Science.gov (United States)

    2013-06-20

    ...EPA is proposing to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of the California State Implementation Plan (SIP). This revision concerns volatile organic compound (VOC) emissions from architectural coatings. We are proposing to approve a local rule to regulate these emission sources under the Clean Air Act (CAA or the Act).

  14. 78 FR 37130 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Science.gov (United States)

    2013-06-20

    ...EPA is taking direct final action to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of the California State Implementation Plan (SIP). This revision concerns volatile organic compound (VOC) emissions from architectural coatings. We are approving a local rule that regulates this emission source under the Clean Air Act (CAA or the Act).

  15. 75 FR 56889 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Science.gov (United States)

    2010-09-17

    ...EPA is taking direct final action to approve revisions to the San Diego County Air Pollution Control District (SDCAPCD) portion of the California State Implementation Plan (SIP). This revision concerns the definition of volatile organic compound (VOC). We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  16. 75 FR 56942 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Science.gov (United States)

    2010-09-17

    ...EPA is proposing to approve revisions to the San Diego Air Pollution Control District (SDCAPCD) portion of the California State Implementation Plan (SIP). This revision concerns the definition of volatile organic compounds (VOC). We are proposing to approve a local rule to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  17. 78 FR 6784 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-01-31

    ...EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC), oxides of nitrogen (NOX), and particulate matter (PM) emissions from open burning. We are proposing to approve local rules to regulate this emission source under the Clean Air Act (CAA or the Act).

  18. 78 FR 6736 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2013-01-31

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern Volatile Organic Compound (VOC), oxides of nitrogen (NOX), and particulate matter (PM) emissions from open burning. We are approving local rules that regulate this emission source under the Clean Air Act (CAA or the Act).

  19. 78 FR 63929 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and...

    Science.gov (United States)

    2013-10-25

    ... requirements for grandfathered facilities. The revisions will contribute to improvement in overall air quality... to contribute to improvement of air quality and attainment or maintenance of the federal air quality...] Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and Regulations...

  20. 78 FR 37132 - Approval and Promulgation of Implementation Plans; Revised Format for Materials Being...

    Science.gov (United States)

    2013-06-20

    ... Promulgation of Implementation Plans; Revised Format for Materials Being Incorporated by Reference for Florida... the ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which... recodification and miscellaneous revisions to the Florida SIP. EPA also finds that there is good cause under APA...

  1. 76 FR 41705 - Approval and Promulgation of Implementation Plans; New York; Revised Format of Materials Being...

    Science.gov (United States)

    2011-07-15

    ...-year period, EPA will review its experience with the new table format and will decide whether or not to... the APA, since the reorganization and codification of the revised format for denoting IBR of the state... Promulgation of Implementation Plans; New York; Revised Format of Materials Being Incorporated by Reference...

  2. United Kingdom. Development plan for the eventual closure of the UK Drigg nuclear surface low level waste disposal facility

    International Nuclear Information System (INIS)

    2001-01-01

    The Drigg site, owned and operated by BNFL, is the UK's principal site for the disposal of low level radioactive waste. The site has operated since 1959 and receives wastes from a wide range of sources including nuclear power stations, nuclear fuel cycle facilities, isotope manufacturing sites, universities, general industry and cleanup of historically contaminated sites. Disposals until the late 1980s were solely by tipping essentially loose wastes into excavated trenches. More recently, trench disposals have been phased out in preference to emplacement of containerised, conditioned wastes in concrete vaults. The standardised wasteform consists of high force compacted (or non-compactable) waste immobilised within 20 m 3 steel overpack containers by the addition of cementitious grout. Larger items of wastes are grouted directly, in situ in the vault. The disposal trenches have been completed with an interim cap, as will the vaults when filled. It is currently estimated that sufficient capacity remains at Drigg for disposals to continue until at least 2050. Post-operations it is planned that the site will enter a phase including shut down of operational facilities, emplacement of long term site closure features including a final closure cap and then to an institutional management phase. Planning has therefore been carried out as to the strategy for eventual closure of the site. This closure strategy is also underpinned by an engineering evaluation studies programme to develop and evaluate appropriate closure measures including assessment of the long term performance of such measures. This appendix summarizes some of this work

  3. Corrective Action Decision Document/Closure Report for Corrective Action Unit 370: T-4 Atmospheric Test Site, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2009-05-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 370, T-4 Atmospheric Test Site, located in Area 4 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 370 is comprised of Corrective Action Site (CAS) 04-23-01, Atmospheric Test Site T-4. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 370 due to the implementation of the corrective action of closure in place with administrative controls. To achieve this, corrective action investigation (CAI) activities were performed from June 25, 2008, through April 2, 2009, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 370: T-4 Atmospheric Test Site and Record of Technical Change No. 1.

  4. Resource Conservation and Recovery Act Closure Plan for the Y-12 9409-5 Tank Storage Facility

    International Nuclear Information System (INIS)

    1995-02-01

    This document presents information on the closure of the Y-12 9409-5 Tank Storage Facility. Topics discussed include: facility description; closure history; closure performance standard; partial closure; maximum waste inventory; closure activities; schedule; and postclosure care

  5. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  6. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of.... * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management District. (1) Rule 1159...

  7. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  8. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  9. 76 FR 5276 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-01-31

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Nitrogen dioxide...

  10. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Sacramento Metropolitan Air Quality...

  11. 76 FR 52623 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-08-23

    ... respiratory and cardiovascular disease, decreased lung function, visibility impairment, and damage to... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of...

  12. 75 FR 28509 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-05-21

    ..., aggravation of respiratory and cardiovascular disease, decreased lung function, visibility impairment, and... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of...

  13. 76 FR 37044 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-06-24

    ... premature mortality, aggravation of respiratory and cardiovascular disease, decreased lung function... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of...

  14. 77 FR 35327 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from the manufacture of polystyrene, polyethylene, and polypropylene products. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  15. 77 FR 24883 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-26

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern oxides of nitrogen (NOX) from solid fuel fired boilers, steam generators and process heaters. We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  16. 77 FR 35329 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-06-13

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from crude oil production sumps and refinery wastewater separators. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  17. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan

    International Nuclear Information System (INIS)

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5

  18. Engineering sustainable ecosystems: using GIS-based habitat modeling for oil sands mine reclamation and closure planning

    International Nuclear Information System (INIS)

    Seel, K.

    1997-01-01

    A GIS model was built to predict the climax vegetation habitat types on reclaimed mine surfaces in the Fort McMurray region of the Mid-Boreal Mixedwood Ecoregion of northwestern Alberta. Regional vegetation habitat types were classified by digital remote sensing using Landsat Thematic Mapper satellite data. Terrain data was derived from a high-resolution digital elevation model. The validated model was applied to the GIS database of Syncrude Canada's Mildred Lake Mine to predict future vegetation patterns based on the final closure mine surface. The results were compared to revegetation and closure plans created by experts to analyze performance and sustainability of reclamation efforts

  19. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  20. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  1. Revised

    DEFF Research Database (Denmark)

    Johannsen, Vivian Kvist; Nord-Larsen, Thomas; Riis-Nielsen, Torben

    This report is a revised analysis of the Danish data on CO2 emissions from forest, afforestation and deforestation for the period 1990 - 2008 and a prognosis for the period until 2020. Revision have included measurements from 2009 in the estimations. The report is funded by the Ministry of Climate...

  2. Menu Planning Guide for School Food Service. Revised.

    Science.gov (United States)

    VanEgmont-Pannell, Dorothy; And Others

    This menu planning guide for school lunches and breakfasts contains: (1) lunch requirements, recommendations, and policies; (2) the basics of menu planning; (3) how to vary portions for various age/grade groups; (4) planning breakfasts; (5) merchandising school lunches and breakfasts; and (6) nutrition education and menu planning; Appendixes…

  3. Corrective Action Decision Document/Closure Report for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick

    2014-08-01

    The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.

  4. Final closure plan for the high-explosives open burn treatment facility at Lawrence Livermore National Laboratory Experimental Test Site 300

    Energy Technology Data Exchange (ETDEWEB)

    Mathews, S.

    1997-04-01

    This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration of site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.

  5. A revised 3-column classification approach for the surgical planning of extended lateral tibial plateau fractures.

    Science.gov (United States)

    Hoekstra, H; Kempenaers, K; Nijs, S

    2017-10-01

    Variable angle locking compression plates allow for lateral buttress and support of the posterolateral joint surface of tibial plateau fractures. This gives room for improvement of the surgical 3-column classification approach. Our aim was to revise and validate the 3-column classification approach to better guide the surgical planning of tibial plateau fractures extending into the posterolateral corner. In contrast to the 3-column classification approach, in the revised approach the posterior border of the lateral column in the revised approach lies posterior instead of anterior of the fibula. According to the revised 3-column classification approach, extended lateral column fractures are defined as single lateral column fractures extending posteriorly into the posterolateral corner. CT-images of 36 patients were reviewed and classified twice online according to Schatzker and revised 3-column classification approach by five observers. The intraobserver reliability was calculated using the Cohen's kappa and the interobserver reliability was calculated using the Fleiss' kappa. The intraobserver reliability showed substantial agreement according to Landis and Koch for both Schatzker and the revised 3-column classification approach (0.746 vs. 0.782 p = 0.37, Schatzker vs. revised 3-column, respectively). However, the interobserver reliability of the revised 3-column classification approach was significantly higher as compared to the Schatzker classification (0.531 vs. 0.669 p column, respectively). With the introduction of variable angle locking compression plates, the revised 3-column classification approach is a very helpful tool in the preoperative surgical planning of tibial plateau fractures, in particular, lateral column fractures that extend into the posterolateral corner. The revised 3-column classification approach is rather a practical supplement to the Schatzker classification. It has a significantly higher interobserver reliability as compared to the

  6. 76 FR 32113 - Revisions to the California State Implementation Plan

    Science.gov (United States)

    2011-06-03

    .... SUMMARY: EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) and Imperial County Air Pollution Control District (ICAPCD) portions of the California... Motor Vehicle Assembly Coatings, Surface Coatings of Metal Parts and Products, Plastic Parts and...

  7. The Revised WIPP Passive Institutional Controls Program - A Conceptual Plan - 13145

    International Nuclear Information System (INIS)

    Patterson, Russ; Klein, Thomas; Van Luik, Abraham

    2013-01-01

    The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing all activities related to the disposal of TRU and TRU-mixed waste in the geologic repository, 650 m below the land surface, at WIPP, near Carlsbad, New Mexico. The main function of the Passive Institutional Controls (PIC's) program is to inform future generations of the long-lived radioactive wastes buried beneath their feet in the desert. For the first 100 years after cessation of disposal operations, the rooms are closed and the shafts leading underground sealed, WIPP is mandated by law to institute Active Institutional Controls (AIC's) with fences, gates, and armed guards on patrol. At this same time a plan must be in place of how to warn/inform the future, after the AIC's are gone, of the consequences of intrusion into the geologic repository disposal area. A plan was put into place during the 1990's with records management and storage, awareness triggers, permanent marker design concepts and testing schedules. This work included the thoughts of expert panels and individuals. The plan held up under peer review and met the requirements of the U.S. Environmental Protection Agency (EPA). Today the NEA is coordinating a study called the 'Preservation of Records, Knowledge and Memory (RK and M) Across Generations' to provide the international nuclear waste repository community with a guide on how a nuclear record archive programs should be approached and developed. CBFO is cooperating and participating in this project and will take what knowledge is gained and apply that to the WIPP program. At the same time CBFO is well aware that the EPA and others are expecting DOE to move forward with planning for the future WIPP PIC's program; so a plan will be in place in time for WIPP's closure slated for the early 2030's. The DOE/CBFO WIPP PIC's program in place today meets the regulatory criteria, but complete feasibility of implementation is questionable, and may not be in conformance

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Grant Evenson

    2010-04-01

    Corrective Action Unit 560 comprises seven corrective action sites (CASs): •03-51-01, Leach Pit •06-04-02, Septic Tank •06-05-03, Leach Pit •06-05-04, Leach Bed •06-59-03, Building CP-400 Septic System •06-59-04, Office Trailer Complex Sewage Pond •06-59-05, Control Point Septic System The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 560 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from October 7, 2008, through February 24, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada, and Record of Technical Change No. 1. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: •Determine whether contaminants of concern (COCs) are present. •If COCs are present, determine their nature and extent. •Provide sufficient information and data to complete appropriate corrective actions. The CAU 560 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: •No contamination exceeding the FALs was identified at CASs 03-51-01, 06-04-02, and 06-59-04. •The soil at the base of the leach pit chamber at CAS 06-05-03 contains arsenic above the FAL of 23 milligrams per kilogram (mg/kg) and polychlorinated biphenyl (PCBs) above the FAL of 0.74 mg/kg, confined vertically from a depth of approximately 5 to 20 feet (ft) below ground surface. The contamination is confined laterally to the walls of the

  9. Closure Report for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States)

    2017-06-01

    The purpose of this CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 568 based on the implementation of corrective actions. This includes a description of closure activities that were performed and an evaluation of the verification data. The CAP (NNSA/NFO, 2016a) and ROTC-1 (NNSA/NFO, 2016c) provide information relating to the selection of CAAs and the reasoning behind their selection. The CADD (NNSA/NFO, 2015) identifies the release sites that require additional corrective action and presents information supporting the selection of CAAs.

  10. 75 FR 2846 - Plan Revision for Prescott National Forest, Yavapai and Coconino Counties, AZ

    Science.gov (United States)

    2010-01-19

    .... Finally, this notice briefly describes the applicable planning rule and how work done on the plan revision... addressed project specific needs and the balance addressed programmatic needs. Programmatic needs for... guidelines; Suitability of lands for timber production, grazing, and recreation opportunities; Monitoring and...

  11. 78 FR 16612 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2013-03-18

    ... Hazardous Substances Pollution Contingency Plan (NCP) to broaden the technology, to include computer... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-2012-0738; FRL-9791-4] National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public Availability of the...

  12. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Science.gov (United States)

    2011-09-23

    ... policies and emphasis on the management of public lands and local land use planning; and new data that have... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD06000, L16100000.DP0000] Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement...

  13. Use of risk assessment panels during revision of the Tongass Land and Resource Management Plan.

    Science.gov (United States)

    Charles G. Shaw

    1999-01-01

    This paper describes the process used to conduct the 16 risk assessment panels and a subsistence working group held during revision of the Tongass land management plan. It provides an overview of how results from the panels were used by forest managers in plan-related decisionmaking, discusses some reactions to the effort, and identifies some opportunities to improve...

  14. 75 FR 56131 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern...

    Science.gov (United States)

    2010-09-15

    ... on the MOCA network recommended in the 2008 Recovery Plan and will instead use the model results to... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N184; 10120-1113-0000-C2] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl...

  15. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  16. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  17. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  18. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  19. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2011-12-06

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of..., Regulatory Planning and Review The Office of Management and Budget (OMB) has exempted this regulatory action...

  20. 20 CFR 435.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  1. 38 CFR 49.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  2. 22 CFR 145.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... Section 145.25 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 145.25 Revision of budget and program plans. (a) The budget plan is the...

  3. 28 CFR 70.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  4. 22 CFR 518.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...

  5. 45 CFR 2543.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  6. 40 CFR 30.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 30.25 Revision of budget and program plans. (a) The budget plan is the financial...

  7. 34 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It may...

  8. 45 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  9. 15 CFR 14.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  10. Planning for closure and deactivation of the EBR-II complex

    International Nuclear Information System (INIS)

    Michelbacher, J.A.; Henslee, S.P.; Poland, H.F.; Wells, P.B.

    1997-01-01

    In January 1994, DOE terminated the Integral Fast Reactor (IFR) Program. Argonne National Laboratory-West (ANL-W) prepared a detailed plan to put Experimental Breeder Reactor-II (EBR-II) in a safe condition, including removal of irradiated fueled subassemblies from the plant, transfer of subassemblies, and removal and stabilization of primary and secondary sodium liquid heat transfer metal. The goal of deactivation is to stabilize the EBR-II complex until decontamination and decommissioning (D ampersand D) is implemented, thereby minimizing maintenance and surveillance. Deactivation of a sodium cooled reactor presents unique concerns. Residual sodium in the primary and secondary systems must be either reacted or inerted to preclude concerns with explosive sodium-air reactions. Also, residual sodium on components will effectively solder these items in place, making removal unfeasible. Several special cases reside in the primary system, including primary cold traps, a cesium trap, a cover gas condenser, and systems containing sodium-potassium alloy. The sodium or sodium-potassium alloy in these components must be reacted in place or the components removed. The Sodium Components Maintenance Shop at ANL-W provides the capability for washing primary components, removing residual quantities of sodium while providing some decontamination capacity. Considerations need to be given to component removal necessary for providing access to primary tank internals for D ampersand D activities, removal of hazardous materials, and removal of stored energy sources. ANL-W's plan for the deactivation of EBR-II addresses these issues, providing for an industrially and radiologically safe complex, requiring minimal surveillance during the interim period between deactivation and D ampersand D. Throughout the deactivation and closure of the EBR-II complex, federal environmental concerns will be addressed, including obtaining the proper permits for facility condition and waste processing

  11. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    International Nuclear Information System (INIS)

    Evans, S. K.

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve 'clean closure' of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems

  12. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Evans, S. K.

    2007-11-07

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.

  13. National Ignition Facility project acquisition plan revision 1

    International Nuclear Information System (INIS)

    Clobes, A.R.

    1996-01-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager

  14. Closure Report for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Al Wickline

    2007-01-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 553 are located within Areas 19 and 20 of the Nevada Test Site. Corrective Action Unit 553 is comprised of the following CASs: 19-99-01, Mud Spill 19-99-11, Mud Spill 20-09-09, Mud Spill 20-99-03, Mud Spill. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 553 were met. To achieve this, the following actions were or will be performed: Review the current site conditions including the concentration and extent of contamination. Implement any corrective actions necessary to protect human health and the environment. Properly dispose of corrective action and investigation wastes. Document the Notice of Completion and closure of CAU 553 to be issued by Nevada Division of Environmental Protection

  15. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order; TOPICAL

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system

  16. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air Pollution Control District (MBUAPCD) and Santa Barbara County Air Pollution Control District (SCAPCD) portions of the California State Implementation Plan (SIP). We are proposing to approve revisions local rules that address emission statements for AVAQMD, rule rescissions that address public records for MBUAPCD, and define terms for SBCAPCD, under the Clean Air Act as amended in 1990 (CAA or the Act).

  17. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) and oxides of sulfur source categories for the AVAQMD and SJVUAPCD. We are approving these negative declarations under the Clean Air Act as amended in 1990 (CAA or the Act).

  18. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern negative declarations for volatile organic compound (VOC) and oxides of sulfur source categories. We are proposing to approve these negative declarations under the Clean Air Act as amended in 1990 (CAA or the Act).

  19. 76 FR 67366 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-01

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These revisions concern oxides of nitrogen (NOX) emissions from industrial, institutional and commercial boilers, stationary internal combustion engines and water heaters. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  20. 76 FR 39357 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ...EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District (KCAPCD), and Ventura County Air Pollution Control District (VCAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from architectural coating operations. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  1. 76 FR 17347 - Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control...

    Science.gov (United States)

    2011-03-29

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control District CFR Correction In Title 40 of the Code of Federal Regulations, Part 52 (Sec. Sec. 52.01 to 52.1018), revised as of July 1, 2010, on page 252, in Sec. 52.220, paragraph (c)(345)(i)(D) is added to...

  2. 76 FR 30080 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-24

    ...EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from surface coatings of metal parts and products. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  3. 75 FR 24408 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-05-05

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on January 22, 2010 and concern oxides of nitrogen (NOx) emissions from residential water heaters. We are approving a local rule that regulates this emission source under the Clean Air Act as amended in 1990 (CAA or the Act).

  4. 76 FR 71886 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from coatings and strippers used on wood products, wood paneling, and miscellaneous metal parts and products. We are approving these local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  5. 76 FR 71922 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ...EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality Management District (SMAQMD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from coatings and strippers used on wood products, wood paneling, and miscellaneous metal parts and products. We are proposing to approve three local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  6. 77 FR 73322 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Science.gov (United States)

    2012-12-10

    ...EPA is taking direct final action to approve revisions to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern opacity standards related to multiple pollutants, including particulate matter (PM) emissions from several different types of sources, ranging from fugitive dust to gas turbines. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act).

  7. 75 FR 10690 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Science.gov (United States)

    2010-03-09

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Air Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on December 18, 2009 and concern reduction of animal matter and volatile organic compound (VOC) emissions from crude oil production, cutback asphalt, and petroleum solvent dry cleaning. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  8. 76 FR 26224 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Science.gov (United States)

    2011-05-06

    ...EPA is proposing to approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts are required under Part C of title I of the Clean Air Act (CAA) to adopt and implement SIP- approved Prevention of Significant Deterioration (PSD) permit programs. These proposed revisions update the definitions used in the districts' PSD permit programs.

  9. 76 FR 26192 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Science.gov (United States)

    2011-05-06

    ...EPA is taking direct final action to approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts are required under Part C of title I of the Clean Air Act (CAA) to adopt and implement SIP-approved Prevention of Significant Deterioration (PSD) permit programs. These revisions update the definitions used in the districts' PSD permit programs.

  10. 77 FR 73392 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Science.gov (United States)

    2012-12-10

    ...EPA is proposing to approve revisions to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State Implementation Plan (SIP). This revision concerns opacity standards related to multiple pollutants, including particulate matter (PM) emissions from several different types of sources, ranging from fugitive dust to gas turbines. We are proposing to approve a local rule to regulate these emission sources under the Clean Air Act (CAA or the Act).

  11. 76 FR 30025 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-24

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from surface coating of metal parts and products. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  12. 76 FR 39303 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ...EPA is taking direct final action to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District (KCAPCD), and Ventura County Air Pollution Control District (VCAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from architectural coating operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  13. 75 FR 37727 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-06-30

    ...EPA is finalizing disapproval of a revision to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on March 22, 2010. This revision concerns opacity standards related to multiple pollutants, including particulate matter (PM) emissions, from a wide variety of sources. Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), this action identifies a deficiency that precludes approval of this SIP revision.

  14. 78 FR 17632 - Caribou-Targhee National Forest; Idaho and Wyoming; Amendment to the Targhee Revised Forest Plan...

    Science.gov (United States)

    2013-03-22

    ...; Amendment to the Targhee Revised Forest Plan--Canada Lynx Habitat AGENCY: Forest Service, USDA. ACTION... Forest proposes to amend the Targhee Revised Forest Plan (1997) to include a map identifying specific... Administrative Review Process: The decision on this proposed plan amendment will be subject to the objection...

  15. Waste minimization and pollution prevention awareness plan. Revision 1

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Waste Minimization and Pollution Prevention Awareness Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, estimate budgets, and review the plan. In addition to the above, this plan records LLNL's goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada (Revision 0) with ROTC 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Krauss, Mark J

    2007-03-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 137 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from February 28 through August 17, 2006, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. ROTC-1: Downgrade FFACO UR at CAU 137, CAS 07-23-02, Radioactive Waste Disposal Site to an Administrative UR. ROTC-2: Downgrade FFACO UR at CAU 137, CAS 01-08-01, Waste Disposal Site to an Administrative UR.

  17. Revised action plan of the Maintenance division for 1965, Annex 4

    International Nuclear Information System (INIS)

    Nikolic, M.

    1965-01-01

    The action plan presented in this annex is a revised version of the plan adopted in January 1965. It includes tasks of the mechanics, electrical and electronic equipment services. It includes a detailed list of planned and preventive maintenance actions related to the heavy water system, technical water system, helium system, reactor core, transportation equipment, hot cells, heating and ventilation systems in the reactor building, power supply system, auxiliary systems in the RA reactor building [sr

  18. Closure Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada with ROTC 1, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Lynn Kidman

    1998-09-01

    This Closure Report provides the documentation for closure of the Roller Coaster Sewage Lagoons and North Disposal Trench Comective Action Unit (CAU) 404. CAU 404 consists of the Roller Coaster Sewage Lagoons (Corrective Action Site [CAS] TA-03-O01-TA-RC) and the North Disposal Trench (CAS TA-21-001-TA-RC). The site is located on the Tonopah Test Range, approximately 225 kilometers (km) (140 miles [mi]) northwest ofLas Vegas, Nevada. . The sewage lagoons received ~quid sanitary waste horn the Operation Roller Coaster Man Camp in 1963 and debris from subsequent range and construction cleanup activities. The debris and ordnance was subsequently removed and properly dispos~, however, pesticides were detected in soil samples born the bottom of the lagoons above the U,S. Environmental Protection Agency Region IX Prelimimuy Remediation Goals (EPA 1996). . The North Disposal Trench was excavated in 1963. Debris from the man camp and subsequent range and construction cleanup activities was placed in the trench. Investigation results indicated that no constituents of concern were detected in soil samples collected from the trench. Remedial alternative proposed in the Comctive Action Decision Document (CADD) fm the site was “Covering” (DOE, 1997a). The Nevada Division of”Enviromnental Protection (NDEP)-approved Correction Action Plan (CAP) proposed the “Covering” niethodology (1997b). The closure activities were completed in accorhce with the approwil CAP and consisted of baclctllling the sewage lagoons and disposal trench, constructing/planting an engineered/vegetative cover in the area of the sewage lagoons and dikposal trencQ installing a perimeter fence and signs, implementing restrictions on fi~e use, and preparing a Post-Closure Monitoring Plan. “ Since closure activities. for CAU 404 have been completed in accordance with the Nevada Division of Environmental Protection-approved CAP (DOE, 1997b) as documented in this Closure Report, the U.S. Department of

  19. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  20. Quality Assurance Program Plan for FFTF effluent controls. Revision 1

    International Nuclear Information System (INIS)

    Seamans, J.A.

    1995-01-01

    This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification

  1. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  2. Environmental monitoring plan - environmental monitoring section. Revision 1

    International Nuclear Information System (INIS)

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures

  3. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Marutzky, Sam; Farnham, Irene

    2014-10-01

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

  4. Tank 241-BY-103 Tank Characterization Plan. Revision 1

    International Nuclear Information System (INIS)

    Schreiber, R.D.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-BY-103

  5. Tank 241-C-103 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    Schreiber, R.D.

    1995-01-01

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-C-103

  6. 77 FR 37359 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-06-21

    ...EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) and the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  7. 77 FR 66429 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-05

    ...EPA is proposing to approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compounds (VOC), carbon monoxide (CO), oxides of nitrogen (NOX), oxides of sulfur (SOX), and particulate matter (PM) emissions from glass melting furnaces. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  8. 78 FR 922 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-01-07

    ...EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California Implementation Plan (SIP). These revisions concern local rules that regulate inhalable particulate matter (PM10) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and agricultural areas in Imperial County. We are proposing to approve local rules that regulate these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  9. 75 FR 13468 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-03-22

    ...EPA is proposing to disapprove a revision to the Monterey Bay Unified Air Pollution Control District (MBAPCD) portion of the California State Implementation Plan (SIP). This revision concerns opacity standards related to multiple pollutants, including particulate matter (PM) emissions from several different types of sources, ranging from fugitive dust to gas turbine generators. We are proposing action on a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  10. Safety Evaluation Report on Tennessee Valley Authority: Revised Corporate Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1987-07-01

    The TVA Corporate Nuclear Performance Plan addresses those corporate concerns identified by the NRC staff. Because much of the TVA corporate plan is programmatic, its effectiveness depends on its implementation, and the NRC staff plans to closely monitor this implementation. The NRC staff will address site-specific concerns in subsequent SERs on each volume of the Nuclear Performance Plan. On the basis of its review, the NRC staff finds TVA's revised Corporate Nuclear Performance Plan (Revision 4) acceptable. The NRC staff concludes that the organization and staffing of TVA's Office of Nuclear Power and the programmatic improvements in place or under way are sufficient, if implemented properly, to resolve the problems at the corporate level that led to issuance of the 10 CFR 50.54(f) letter dated September 17, 1985, and to support continuing TVA nuclear activities, including plant operations. 19 refs., 3 figs

  11. Proposed plan for the Tank 105-C Hazardous Waste Management Facility. Revision 1

    International Nuclear Information System (INIS)

    Miles, W.C. Jr.

    1994-01-01

    This Proposed Plan was developed to describe the remedial action selected at the Tank 105-C Hazardous Waste Management Facility (HWMF) source-specific unit within the C-Area Fundamental Study Area (FSA) at the Savannah River Site (SRS) and to fulfill Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. This 8,400 gallon capacity tank was certified and accepted closed according to a closure plan approved by the state of South Carolina under the Resource Conservation and Recovery Act (RCRA) authority in January 1991. As a result of the closure, previously performed under RCRA, the unit poses no current or potential threat to human health or the environment. Accordingly, no further remedial action is necessary under CERCLA

  12. DIII-D tokamak long range plan. Revision 3

    International Nuclear Information System (INIS)

    1992-08-01

    The DIII-D Tokamak Long Range Plan for controlled thermonuclear magnetic fusion research will be carried out with broad national and international participation. The plan covers: (1) operation of the DIII-D tokamak to conduct research experiments to address needs of the US Magnetic Fusion Program; (2) facility modifications to allow these new experiments to be conducted; and (3) collaborations with other laboratories to integrate DIII-D research into the national and international fusion programs. The period covered by this plan is 1 November 19983 through 31 October 1998

  13. Tank 241-BY-110 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-BY-110

  14. Tank 241-S-107 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-S-107

  15. 242-A Evaporator quality assurance plan. Revision 2

    International Nuclear Information System (INIS)

    Basra, T.S.

    1995-01-01

    The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (called process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks

  16. Tank 241-AN-102 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-AN-102

  17. Tank 241-U-111 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-U-111

  18. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Fritz, R.L.

    1995-01-01

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities

  19. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  20. Tank 241-B-106 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-B-106

  1. Tank 241-SY-103 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    Homi, C.S.

    1995-01-01

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-SY-103

  2. B Plant Complex pollution prevention plan. Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    The US Department of Energy (DOE) has directed Westinghouse Hanford Company (WHC) to develop an effective strategy to minimize the generation of hazardous, radioactive, and mixed wastes at Hanford in compliance with state and federal regulations. WHC has formalized a pollution prevention program composed of management policies, management requirements and procedures. This plan addresses pollution prevention for B Plant Complex. A pollution prevention team is in place and has been assigned responsibility for implementing the plan. This plan includes actions and goals for reducing volume and toxicity of waste generated, as well as a basis for evaluation of progress. Descriptions of waste streams, current specific goals, general pollution prevention methods, and specific accomplishments are in the appendices of this plan

  3. Plutonium Focus Area research and development plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects.

  4. Plutonium Focus Area research and development plan. Revision 1

    International Nuclear Information System (INIS)

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects

  5. Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1997-05-01

    Plugging and abandonment (P ampersand A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P ampersand A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P ampersand A, the technical methods employed to perform P ampersand A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P ampersand A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P ampersand A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P ampersand A schedule be maintained. Wells are added to this list by issuance of both a P ampersand A request and a P ampersand A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P ampersand A has been developed and the plan revised to formalize the new business practices

  6. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ''Plans,'' for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ''Waste Reduction,'' an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD

  7. ORCWM test and evaluaton master plan. Revision 00

    International Nuclear Information System (INIS)

    1995-08-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Test and Evaluation Master Plan (TEMP) describes the program Test and Evaluation (T ampersand E) policy, objectives, requirements, general methodology (test flow and description of each T ampersand E phase), responsibilities, and scheduling of test phases for the Civilian Radioactive Waste Management System (CRWMS). This TEMP is a program-level management planning document for al CRWMS T ampersand E activities and will be used in conjunction with Section 11 of the Quality Assurance Requirements and Description (QARD), as appropriate, as a guide for the projects in developing their T ampersand E plans. In the OCRWM document hierarchy, that is described in the OCRWM Systems Engineering Management Plan (SEMP), the TEMP is subordinate to the program SEMP. To ensure CRWMS operates as an integrated system, the plans for verifying the performance and evaluating the operational suitability and effectiveness of the overall system are also described. Test and evaluation is an integral part of the systems engineering process. Key aspects of the systems engineering process, more fully described in the OCRWM SEMP, are discussed in this TEMP to illustrate how T ampersand E supports the overall systems engineering process

  8. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ``Plans,`` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ``Waste Reduction,`` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD.

  9. Professional Closure Beyond State Authorization

    Directory of Open Access Journals (Sweden)

    Gitte Sommer Harrits

    2014-03-01

    Full Text Available For decades, the Weberian approach to the study of professions has been strong, emphasizing state authorization and market monopolies as constituting what is considered a profession. Originally, however, the Weberian conception of closure, or the ways in which a profession is constituted and made separate, was broader. This article suggests a revision of the closure concept, integrating insights from Pierre Bourdieu, and conceptualizing professional closure as the intersection of social, symbolic and legal closure. Based on this revision, this article demonstrates how to apply such a concept in empirical studies. This is done by exploring social, symbolic and legal closure across sixteen professional degree programs. The analyses show a tendency for some overlap between different forms of closure, with a somewhat divergent pattern for legal closure. Results support the argument that we need to study these processes as an intersection of different sources of closure, including capital, lifestyles and discourse

  10. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  11. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  12. DOE-owned spent nuclear fuel strategic plan. Revision 1

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) is responsible for safely and efficiently managing DOE-owned spent nuclear fuel (SNF) and SNF returned to the US from foreign research reactors (FRR). The fuel will be treated where necessary, packaged suitable for repository disposal where practicable, and placed in interim dry storage. These actions will remove remaining vulnerabilities, make as much spent fuel as possible ready for ultimate disposition, and substantially reduce the cost of continued storage. The goal is to complete these actions in 10 years. This SNF Strategic Plan updates the mission, vision, objectives, and strategies for the management of DOE-owned SNF articulated by the SNF Strategic Plan issued in December 1994. The plan describes the remaining issues facing the EM SNF Program, lays out strategies for addressing these issues, and identifies success criteria by which program progress is measured. The objectives and strategies in this plan are consistent with the following Em principles described by the Assistance Secretary in his June 1996 initiative to establish a 10-year time horizon for achieving most program objectives: eliminate and manage the most serious risks; reduce mortgage and support costs to free up funds for further risk reduction; protect worker health and safety; reduce generation of wastes; create a collaborative relationship between DOE and its regulators and stakeholders; focus technology development on cost and risk reduction; and strengthen management and financial control

  13. Affirmative Action Plans, January 1, 1994--December 31, 1994. Revision

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    This document is the Affirmative Action Plan for January 1, 1994 through December 31, 1994 for the Lawrence Berkeley Laboratory, University of California (``LBL`` or ``the Laboratory.``) This is an official document that will be presented upon request to the Office of Federal Contract Compliance Programs, US Department of Labor. The plan is prepared in accordance with the Executive Order 11246 and 41 CFR Section 60-1 et seq. covering equal employment opportunity and will be updated during the year, if appropriate. Analyses included in this volume as required by government regulations are based on statistical comparisons. All statistical comparisons involve the use of geographic areas and various sources of statistics. The geographic areas and sources of statistics used here are in compliance with the government regulations, as interpreted. The use of any geographic area or statistic does not indicate agreement that the geographic area is the most appropriate or that the statistic is the most relevant. The use of such geographic areas and statistics is intended to have no significance outside the context of this Affirmative Action Plan, although, of course, such statistics and geographic areas will be used in good faith with respect to this Affirmative Action Plan.

  14. Planning the School Food Service Facilities. Revised 1967.

    Science.gov (United States)

    Utah State Board of Education, Salt Lake City.

    Evaluations of food service equipment, kitchen design and food service facilities are comprehensively reviewed for those concerned with the planning and equipping of new school lunchrooms or the remodeling of existing facilities. Information is presented in the form of general guides adaptable to specific local situations and needs, and is…

  15. 222-S Laboratory Quality Assurance Plan. Revision 1

    International Nuclear Information System (INIS)

    Meznarich, H.K.

    1995-01-01

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document

  16. Automated Procurement System (APS) revised project management plan (DS-03)

    Science.gov (United States)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  17. 242-A evaporator quality assurance project plan: Revision 1

    International Nuclear Information System (INIS)

    Tucker, B.J.

    1994-01-01

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal

  18. Human Research Program Integrated Research Plan. Revision A January 2009

    Science.gov (United States)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  19. 75 FR 1715 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-01-13

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVAPCD) portion of the...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  20. 77 FR 22676 - Revisions to the Arizona State Implementation Plan, Pinal County Air Quality Control District

    Science.gov (United States)

    2012-04-17

    ... the Arizona State Implementation Plan, Pinal County Air Quality Control District AGENCY: Environmental... disapproval of a revision to the Pinal County Air Quality Control District portion of the Arizona State... the Control Officer to determine whether the manner of control of fugitive emissions is satisfactory...

  1. 75 FR 8008 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2010-02-23

    ... the California State Implementation Plan, Imperial County Air Pollution Control District AGENCY... limited disapproval of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of... soils in open and agricultural areas. We are proposing action on local rules that regulate these...

  2. 75 FR 21221 - Plan Revision for Kaibab National Forest; Coconino, Yavapai, and Mojave Counties; AZ

    Science.gov (United States)

    2010-04-23

    ..., including the identification of management indicator species (MIS). It may also make new special area... identification of the types of decisions that will not be made within the revised forest plan. The authorization... characteristics such as spacing tree groups and tree density; and disturbance patterns such as frequency, severity...

  3. 75 FR 15648 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Discrete...

    Science.gov (United States)

    2010-03-30

    ... Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Discrete Emission Credit Banking and... Air Quality Rules, Subchapter H--Emissions Banking and Trading, Division 4--Discrete Emission Credit Banking and Trading, referred to elsewhere in this notice as the Discrete Emission Reduction Credit (DERC...

  4. 75 FR 27644 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Discrete...

    Science.gov (United States)

    2010-05-18

    ... Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Discrete Emission Credit Banking and... Rules, Subchapter H--Emissions Banking and Trading, Division 4--Discrete Emission Credit Banking and Trading, referred to elsewhere in this notice as the Discrete Emission Reduction Credit (DERC) Program...

  5. 76 FR 32333 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Revision to the...

    Science.gov (United States)

    2011-06-06

    ...) Program--Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania for the purpose of changing the...). Specifically, the Commonwealth is amending a provision of its prior SIP-approved I/M program to amend the...

  6. 75 FR 15645 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to the Emission...

    Science.gov (United States)

    2010-03-30

    ... clarify EPA's role in the approval of emission quantification protocols. While the previous SIP- approved... approve severable portions of two revisions to the Texas State Implementation Plan (SIP) submitted by the... to further clarify procedures for using emission protocols and to update the approved list of...

  7. 75 FR 69910 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Science.gov (United States)

    2010-11-16

    ...'s national Consumer Products rule. The TSD has more information on our evaluation. C. Public Comment... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...

  8. 76 FR 62004 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Science.gov (United States)

    2011-10-06

    ... Organic Compound Emission Standards for Consumer Products. B. Does the rule meet the evaluation criteria... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY... revisions concern volatile organic compound (VOC) emissions from consumer products. We are approving a local...

  9. 76 FR 56132 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-12

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... did the State submit? B. Are there other versions of this rule? C. What is the purpose of the...

  10. 12 CFR 702.306 - Revised business plans for new credit unions.

    Science.gov (United States)

    2010-01-01

    ... exposure to risk (including credit risk, interest-rate risk, and other types of risk). (d) Consideration of... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Revised business plans for new credit unions. 702.306 Section 702.306 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING...

  11. 75 FR 15348 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision To Control...

    Science.gov (United States)

    2010-03-29

    ... to control volatile organic compound (VOC) emissions from storage tanks, transport vessels and marine... Promulgation of Air Quality Implementation Plans; Texas; Revision To Control Volatile Organic Compound..., Division 1 (Storage of Volatile Organic Compounds) and Subchapter F, Division 3 (Degassing or Cleaning of...

  12. 76 FR 29153 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... approve revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of the California... approving with the dates that they were adopted by the Mojave Desert Air Quality Management District (MDAQMD...

  13. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-24

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura.... SUMMARY: EPA is finalizing approval of revisions to the Antelope Valley Air Quality Management District...

  14. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9432-1] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  15. 76 FR 29182 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0030; FRL-9308-4] Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... the Mojave Desert Air Quality Management District (MDAQMD) portion of the California State...

  16. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... limited disapproval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of... designated nonattainment for the fine particulate matter (PM2.5) National Ambient Air Quality Standards...

  17. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... submit regulations that control the primary and secondary National Ambient Air Quality Standards (NAAQS...

  18. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0503; FRL-9183-5] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  19. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0897; FRL-9499-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  20. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM...

  1. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-13

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); does...

  2. 76 FR 38589 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0383; FRL-9428-1] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State...

  3. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... California State Implementation Plan; South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District portion of the California State Implementation... Submittal A. What rule did the State submit? We are approving South Coast Air Quality Management District...

  4. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid...

  5. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management...

  6. 76 FR 38572 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion of the... approving with the dates that they were adopted by the Antelope Valley Air Quality Management District...

  7. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air...: EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions of the...

  8. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0286; FRL-9138-7] Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State...

  9. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of.... * * * * * (c) * * * (378) * * * (i) * * * (E) Feather River Air Quality Management District. (1) Rule 3.22...

  10. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... Governor's Designee. (i) Incorporation by reference. (A) South Coast Air Quality Management District. (1...

  11. 77 FR 32398 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... action: Is not a ``significant regulatory action'' subject to review by the Office of Management and...

  12. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-26

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...'s Designee. (i) Incorporation by Reference. (A) South Coast Air Quality Management District. (1...

  13. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California..., this action: Is not a ``significant regulatory action'' subject to review by the Office of Management...

  14. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-09-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9711-2] Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  15. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-29

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  16. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of...,'' Northeast States for Coordinated Air Use Management, December 2000. B. Does the rule meet the evaluation...

  17. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-09-19

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Standards (NAAQS). The revisions to the primary and secondary Lead NAAQS were to provide increased...

  18. 76 FR 68638 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen...

    Science.gov (United States)

    2011-11-07

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revision to Nitrogen Oxides Budget Trading Program... pertains to regulatory language in its nitrogen oxides (NO X ) Budget Trading Program that inadvertently..., Nitrogen dioxide, Ozone, Sulfur oxides. Dated: October 25, 2011. W.C. Early, Acting Regional Administrator...

  19. 77 FR 214 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-04

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approval of revisions to the San Joaquin Valley Air Pollution Control District (SJVUAPCD) portion of the... used by the California Air Resources Board and air districts for evaluating air pollution control...

  20. 77 FR 745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-01-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0547; FRL-9480-1] Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) Correction In rule document 2011-33660 appearing on pages 214-217 in the issue of Wednesday, January 4, 2012, make the following corrections...

  1. 76 FR 31242 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Science.gov (United States)

    2011-05-31

    ... the California State Implementation Plan, Santa Barbara County Air Pollution Control District AGENCY... limited disapproval of revisions to the Santa Barbara County Air Pollution Control District (SBCAPCD... BTU/hr and internal combustion engines with a rated brake horse power of 50 or greater. Under...

  2. 76 FR 40237 - Approval and Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions...

    Science.gov (United States)

    2011-07-08

    ... words EPA, we, us or our mean or refer to the United States Environmental Protection Agency. (iii) The... no federal requirement for minor source BACT. To the extent the commenter makes this argument, EPA... Disapproval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the Administrative...

  3. 76 FR 59338 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Science.gov (United States)

    2011-09-26

    ... to other minor administrative changes to the Administrative Rules of Montana. The intended effect of... words EPA, we, us or our mean or refer to the United States Environmental Protection Agency. (iii) The... Promulgation of Air Quality Implementation Plans; Montana; Revisions to the Administrative Rules of Montana...

  4. 75 FR 3993 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Revisions to the...

    Science.gov (United States)

    2010-01-26

    ... include minor editorial and grammatical changes, updates to the citations and references to federal and... otherwise. (ii) The words EPA, we, us or our mean or refer to the United States Environmental Protection... Promulgation of Air Quality Implementation Plans; Montana; Revisions to the Administrative Rules of Montana...

  5. 78 FR 29032 - Approval and Promulgation of Implementation Plans Tennessee: Revisions to Volatile Organic...

    Science.gov (United States)

    2013-05-17

    ... of the term ``particulate matter emissions'' at 1200-03-09-.01(4)(b)47 (vi) as part of the definition... Promulgation of Implementation Plans Tennessee: Revisions to Volatile Organic Compound Definition AGENCY..., 1999, SIP adds 17 compounds to the list of compounds excluded from the definition of ``Volatile Organic...

  6. 76 FR 56134 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-12

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... preempt Tribal law. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  7. 75 FR 60623 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-10-01

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approval and limited disapproval of revisions to the San Joaquin Valley Unified Air Pollution Control... 30, 2008) \\2\\; and Ventura County Air Pollution Control District (VCAPCD) Rule 74.15 (as amended...

  8. 75 FR 57862 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2010-09-23

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... section 307(b)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  9. 76 FR 69135 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-11-08

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  10. 76 FR 56706 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-09-14

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental...

  11. 76 FR 35167 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-06-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0312; FRL-9319-8] Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations...

  12. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  13. DOE Region 6 Radiological Assistance Program plan. Revision 1

    International Nuclear Information System (INIS)

    Jakubowski, F.M.

    1995-11-01

    The US Department of Energy (DOE) has sponsored a Radiological Assistance Program (RAP) since the 1950's. The RAP is designed to make DOE resources available to other DOE facilities, state, tribal, local, private businesses, and individuals for the explicit purpose of assisting during radiological incidents. The DOE has an obligation, through the Atomic Energy Act of 1954, as amended, to provide resources through the Federal Radiological Emergency Response Plan (FRERP, Nov. 1985) in the event of a radiological incident. Toward this end, the RAP program is implemented on a regional basis, and has planned for an incremental response capability with regional coordination between states and DOE response elements. This regional coordination is intended to foster a working relationship between DOE radiological assistance elements and those state, tribal, and local agencies responsible for first response to protect public health and safety

  14. Investigation-Derived Waste Management Plan. Revision 2

    International Nuclear Information System (INIS)

    Molen, G.

    1995-01-01

    SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment

  15. PUREX Storage Tunnels waste analysis plan. Revision 1

    International Nuclear Information System (INIS)

    Stephenson, M.J.

    1995-11-01

    Washington Administrative Code 173-303-300 requires that a facility develop and follow a written waste analysis plan which describes the procedures that will be followed to ensure that its dangerous waste is managed properly. This document covers the activities at the PUREX Storage Tunnels used to characterize and designate waste that is generated within the PUREX Plant, as well as waste received from other on-site sources

  16. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  17. Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTC-1, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Kauss

    2011-06-01

    , 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low

  18. Technical data summary: Plan for closure of the 643-G burial ground

    International Nuclear Information System (INIS)

    Cook, J.R.

    1987-01-01

    This report involves the actions of closing the 643-G burial ground which involves waste removal, stabilization, and capping. Remedial action involves the removing of the transuranic waste and closing of the grid wells. The closure cap for the burial site will consist of native soil, clay, and gravel. This will assure long-term physical and chemical stability. (MB)

  19. 242-A Evaporator waste analysis plan. Revision 4

    International Nuclear Information System (INIS)

    Basra, T.S.; Mulkey, C.H.

    1994-01-01

    This waste analysis plan (WAP) provides the plan for obtaining information needed for proper waste handling and processing in the 242-A Evaporator located on the Hanford Site. Regulatory and safety issues are addressed by establishing boundary conditions for waste received and treated at the 242-A Evaporator. The boundary conditions are set by establishing limits for items such as potential exothermic reactions, waste compatibility, and control of vessel vent organic emissions. Boundary conditions are also set for operational considerations and to ensure waste acceptance at receiving facilities. The issues that are addressed in this plan include prevention of exotherms in the waste, waste compatibility, vessel vent emissions, and compatibility with the liner in the Liquid Effluent Retention Facility (LERF). The 242-A Evaporator feed stream is separated into two liquid streams: a concentrated slurry stream and a process condensate. A gaseous exhaust stream is also produced. The slurry contains the majority of the radionuclides and inorganic constituents. This stream is pumped back to the double shell tanks (DSTs) and stored for further treatment after being concentrated to target levels. The process condensate (PC) is primarily water that contains trace amounts of organic material and a greatly reduced concentration of radionuclides. The process condensate is presently stored in the (LERF) until it can be further processed in the Effluent Treatment Facility once it is operational

  20. Corrective Action Decision Document/Closure Report for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K. [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-02-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 550: Smoky Contamination Area, Nevada National Security Site, Nevada. CAU 550 includes 19 corrective action sites (CASs), which consist of one weapons-related atmospheric test (Smoky), three safety experiments (Ceres, Oberon, Titania), and 15 debris sites (Table ES-1). The CASs were sorted into the following study groups based on release potential and technical similarities: • Study Group 1, Atmospheric Test • Study Group 2, Safety Experiments • Study Group 3, Washes • Study Group 4, Debris The purpose of this document is to provide justification and documentation supporting the conclusion that no further corrective action is needed for CAU 550 based on implementation of the corrective actions listed in Table ES-1. Corrective action investigation (CAI) activities were performed between August 2012 and October 2013 as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area; and in accordance with the Soils Activity Quality Assurance Plan. The approach for the CAI was to investigate and make data quality objective (DQO) decisions based on the types of releases present. The purpose of the CAI was to fulfill data needs as defined during the DQO process. The CAU 550 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs.

  1. Tank farm health and safety plan. Revision 2

    International Nuclear Information System (INIS)

    Mickle, G.D.

    1995-01-01

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, open-quotes Health and Safety Programs for Hazardous Waste Operations;close quotes 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved

  2. Tank farm health and safety plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Mickle, G.D.

    1995-03-29

    This Tank Farm Health and Safety Plan (HASP) for the conduct of all operations and work activities at the Hanford Site 200 Area Tank Farms is provided in order to minimize health and safety risks to workers and other onsite personnel. The HASP accomplishes this objective by establishing requirements, providing general guidelines, and conveying farm and facility-specific hazard communication information. The HASP, in conjunction with the job-specific information required by the HASP, is provided also as a reference for use during the planning of work activities at the tank farms. This HASP applies to Westinghouse Hanford Company (WHC), other prime contractors to the U.S. Department of Energy (DOE), and subcontractors to WHC who may be involved in tank farm work activities. This plan is intended to be both a requirements document and a useful reference to aid tank farm workers in understanding the safety and health issues that are encountered in routine and nonroutine work activities. The HASP defines the health and safety responsibilities of personnel working at the tank farms. It has been prepared in recognition of and is consistent with National Institute of Safety and Health (NIOSH), and Occupational Safety and Health Administration (OSHA)/Unlimited State Coast Guard (USCG)/U.S. Environmental Protection Agency (EPA), Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (NIOSH 1985); WHC-CM-4-3, Industrial Safety Manual, Volume 4, {open_quotes}Health and Safety Programs for Hazardous Waste Operations;{close_quotes} 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response; WHC-CM-1-1, Management Policies; and WHC-CM-1-3, Management Requirements and Procedures. When differences in governing regulations or policies exist, the more stringent requirements shall apply until the discrepancy can be resolved.

  3. Nuclear power plant severe accident research plan. Revision 1

    International Nuclear Information System (INIS)

    Marino, G.P.

    1986-04-01

    Subsequent to the Three Mile Island Unit 2 accident, recommendations were made by a number of review committees to consider regulatory changes which would provide better protection of the public from severe accidents. Over the past six years a major research effort has been underway by the NRC to develop an improved understanding of severe accidents and to provide a technical basis to support regulatory decisions. The purpose of this report is to describe current plans for the completion and extension of this research in support of ongoing regulatory actions in this area

  4. Management plan for White Oak Dam. Revision 1

    International Nuclear Information System (INIS)

    Ahmed, S.B.

    1997-03-01

    The purpose is to provide operation and maintenance, periodic inspection, and emergency action plans for White Oak Dam in general accordance with the Federal Emergency Management Agency (FEMA) guidelines for dam safety. It must be understood that operations at the site are primarily for purposes of environmental monitoring, environmental protection and waste management operations control. Effluent is generally allowed to flow from the lake at its natural rate by rising above the broad crested weir notch elevation of 744 feet m.s.l

  5. LANDSAT-D ground segment operations plan, revision A

    Science.gov (United States)

    Evans, B.

    1982-01-01

    The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.

  6. Public involvement plan for the Oak Ridge Reservation. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    For the past few years, the Department of Energy (DOE) has increased its efforts to involve the public in environmental management decisions. On the national level, Energy Secretary Hazel O'Leary has declared public involvement one of DOE's most important objectives. On the local level, citizens are taking the microphone at DOE public hearings to voice their opinions and ask tough, detailed questions about proposed cleanup plans. To ensure that it hears, understands and responds to public input from all of its neighbors, DOE-Oak Ridge Operations has developed an Environmental Management Public Involvement Program to keep stakeholders--those affected or potentially affected by cleanup programs--informed about environmental management work on the Oak Ridge Reservation and opportunities for public comment. This Public Involvement Plan contains information about the Oak Ridge Public Involvement Program its history, goals and proposed interactions with stakeholders. It also contains information to help area citizens become involved or increase their involvement in helping DOE make responsible environmental management decisions

  7. Tank waste remediation system integrated technology plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, B.; Ignatov, A.; Johnson, S.; Mann, M.; Morasch, L.; Ortiz, S.; Novak, P. [eds.] [Pacific Northwest Lab., Richland, WA (United States)

    1995-02-28

    The Hanford Site, located in southeastern Washington State, is operated by the US Department of Energy (DOE) and its contractors. Starting in 1943, Hanford supported fabrication of reactor fuel elements, operation of production reactors, processing of irradiated fuel to separate and extract plutonium and uranium, and preparation of plutonium metal. Processes used to recover plutonium and uranium from irradiated fuel and to recover radionuclides from tank waste, plus miscellaneous sources resulted in the legacy of approximately 227,000 m{sup 3} (60 million gallons) of high-level radioactive waste, currently in storage. This waste is currently stored in 177 large underground storage tanks, 28 of which have two steel walls and are called double-shell tanks (DSTs) an 149 of which are called single-shell tanks (SSTs). Much of the high-heat-emitting nuclides (strontium-90 and cesium-137) has been extracted from the tank waste, converted to solid, and placed in capsules, most of which are stored onsite in water-filled basins. DOE established the Tank Waste Remediation System (TWRS) program in 1991. The TWRS program mission is to store, treat, immobilize and dispose, or prepare for disposal, the Hanford tank waste in an environmentally sound, safe, and cost-effective manner. Technology will need to be developed or improved to meet the TWRS program mission. The Integrated Technology Plan (ITP) is the high-level consensus plan that documents all TWRS technology activities for the life of the program.

  8. Tank waste remediation system integrated technology plan. Revision 2

    International Nuclear Information System (INIS)

    Eaton, B.; Ignatov, A.; Johnson, S.; Mann, M.; Morasch, L.; Ortiz, S.; Novak, P.

    1995-01-01

    The Hanford Site, located in southeastern Washington State, is operated by the US Department of Energy (DOE) and its contractors. Starting in 1943, Hanford supported fabrication of reactor fuel elements, operation of production reactors, processing of irradiated fuel to separate and extract plutonium and uranium, and preparation of plutonium metal. Processes used to recover plutonium and uranium from irradiated fuel and to recover radionuclides from tank waste, plus miscellaneous sources resulted in the legacy of approximately 227,000 m 3 (60 million gallons) of high-level radioactive waste, currently in storage. This waste is currently stored in 177 large underground storage tanks, 28 of which have two steel walls and are called double-shell tanks (DSTs) an 149 of which are called single-shell tanks (SSTs). Much of the high-heat-emitting nuclides (strontium-90 and cesium-137) has been extracted from the tank waste, converted to solid, and placed in capsules, most of which are stored onsite in water-filled basins. DOE established the Tank Waste Remediation System (TWRS) program in 1991. The TWRS program mission is to store, treat, immobilize and dispose, or prepare for disposal, the Hanford tank waste in an environmentally sound, safe, and cost-effective manner. Technology will need to be developed or improved to meet the TWRS program mission. The Integrated Technology Plan (ITP) is the high-level consensus plan that documents all TWRS technology activities for the life of the program

  9. Socioeconomic monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the SMMP is to document compliance with the NWPA. In order to do so, a summary description of site characterization activities based on the consultation draft of the Site Characterization Plan and the final EA is provided. Subsequent chapters identify issues related to the potential for significant adverse impacts and the monitoring plans proposed to determine whether those impacts occur. Should monitoring confirm the potential for significant adverse impact, mitigative maesures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicable, any significant adverse environmental impacts. Proposed site characterization activites involve a variety of surface and subsurface activities including site preparation, access road construction and improvment, exploratory drilling and testing, geophysical surveys, geological mapping, and construction of the exploratory shaft facility. It is not anticipated that any significant adverse socioeconomic impacts will result form any of the proposed site characterization activities. However, the assessment of impacts in the EA, especially impacts related to employment and population growth, was based on assumptions concerning activities and conditions during the site characterization phase

  10. Nevada Test Site Site Treatment Plan. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada's input. The options and schedules reflect a ''bottoms-up'' approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions

  11. U.S. Btu tax plan revised; industry wary of results

    International Nuclear Information System (INIS)

    Crow, P.

    1993-01-01

    The Clinton administration has changed its U.S. energy tax proposal to remove some objection voiced by industry and consumers. The Treasury Department's revised plan will still tax oil products at double the rate of other types of energy except for home heating oil, which now is to be taxed at the lower rate for natural gas. Of major importance to California producers, the revision will not tax natural gas used in enhanced recovery for heavy oil. This paper describes exemptions; effects on natural gas; the credibility gap; inhibition of gas market recovery; tax on NGL; and forecasting the future

  12. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). We are proposing to approve revisions to local rules that define terms used in other air pollution regulations in these areas and a rule rescission that address Petroleum Coke Calcining Operations--Oxides of Sulfur, under the Clean Air Act as amended in 1990 (CAA or the Act).

  13. 75 FR 24406 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2010-05-05

    ...EPA is taking direct final action to approve revisions to the Placer County Air Pollution Control District (PCAPCD), Sacramento Metropolitan Air Quality Management District (SMAQMD), San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD), and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from petroleum facilities, chemical plants, and facilities which use organic solvents. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  14. 75 FR 2796 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Science.gov (United States)

    2010-01-19

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Air Pollution Control District portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on June 16, 2009 and concern volatile organic compound (VOC) emissions from coating of metal parts, large appliances, metal furniture, motor vehicles, mobile equipment, cans, coils, organic solvent cleaning, and storage and disposal related to such operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  15. 76 FR 60376 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ...EPA is taking direct final action to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Sacramento Municipal Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from solvent cleaning machines and solvent cleaning operations and oil and gas production wells. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  16. 78 FR 21581 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Science.gov (United States)

    2013-04-11

    ...EPA is proposing to approve revisions to the Santa Barbara County Air Pollution Control District (SBCAPCD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) and oxides of nitrogen (NOX) emissions from gas-fired fan-type central furnaces, small water heaters, and the transfer and dispensing of gasoline. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act (CAA or the Act).

  17. 76 FR 60405 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ...EPA is proposing to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Sacramento Municipal Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from solvent cleaning machines and solvent cleaning operations and oil and gas production wells. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  18. 78 FR 21542 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Science.gov (United States)

    2013-04-11

    ...EPA is taking direct final action to approve revisions to the Santa Barbara County Air Pollution Control District (SBCAPCD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) and oxides of nitrogen (NOX) emissions from gas-fired fan-type central furnaces, small water heaters, and the transfer and dispensing of gasoline. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  19. 76 FR 5277 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-01-31

    ...EPA is taking direct final action to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Antelope Valley Air Quality Management District (AVAQMD), Ventura County Air Pollution Control District (VCAPCD) and Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from gasoline bulk plants, terminals and vehicle dispensing facilities. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  20. 76 FR 16696 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-03-25

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on November 5, 2010 and concern oxides of nitrogen (NOX), carbon monoxide (CO), oxides of sulfur (SO2) and particulate matter emissions from boilers, steam generators and process heaters greater than 5.0 MMbtu/hour. We are approving a local rule that regulates these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  1. 75 FR 24544 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2010-05-05

    ...EPA is proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD), Sacramento Metropolitan Air Quality Management District (SMAQMD), San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD), and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from petroleum facilities, chemical plants, and facilities which use organic solvents. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  2. 76 FR 5319 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-01-31

    ...EPA is proposing to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Placer County Air Pollution Control District (PCAPCD), Antelope Valley Air Quality Management District (AVAQMD), and Ventura County Air Pollution Control District (VCAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from gasoline bulk plants, terminals and vehicle dispensing facilities. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  3. Guidance for closure of existing DOE LLW disposal sites

    International Nuclear Information System (INIS)

    Blanchfield, L.

    1987-01-01

    During FY 1986, a closure guidance document was developed. The purpose of this document is to provide guidance in support of DOE Order 5820.2 to site operating contractors for the stabilization and closure of existing low-level waste (LLW) shallow land disposal sites at US Department of Energy (DOE) facilities. Guidance is provided to aid operators in placing existing LLW sites in a closed conditions, i.e., a condition in which a nonoperational site meets postclosure performance requirements and can be shown, within a high degree of confidence, to perform as anticipated in the future, under the most cost-effective maintenance approach. Guidance is based on the philosophy that closure should be planned and performed using a systems approach. Plans for FY 1987 call for revision of the document to incorporate more information on closure of LLW sites also containing radioactive mixed waste and/or transuranic waste. 4 references, 3 figures, 2 tables

  4. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  5. Hanford analytical services quality assurance plan. Revision 1

    International Nuclear Information System (INIS)

    1995-02-01

    This document, the Hanford Analytical Services Quality Assurance Plan (HASQAP), is issued by the U.S. Department of Energy, Richland Operations Office (RL). The HASQAP establishes quality requirements in response to U.S. Department of Energy (DOE) Order 5700.6C, Quality Assurance (10 CFR 830.120, open-quotes Quality Assurance Requirementsclose quotes). The HASQAP is designed to meet the needs of the RL for controlling the of analytical chemistry services provided by laboratory operations. The HASQAP is issued through the Analytical Services Branch of the Waste Management Division. The Analytical Services Branch is designated by the RL as having the responsibility for oversight management of laboratory operations under the Waste Management Division. The laboratories conduct sample analyses under several regulatory statutes, such as the Clean Air Act and the Clean Water Act. Sample analysis in support of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) is a major role of the laboratory operations

  6. B Plant Complex waste management training plan. Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    This training program is designed to comply with all applicable federal, state and US Department of Energy-Richland Operations Office training requirements. The training program complies with requirements contained within WAC 173-303-330 for the development of a written dangerous waste training program. The training program is designed to prepare personnel to manage and maintain waste treatment, storage and disposal (TSD) units, as well as generator units, in a safe, effective, efficient and environmentally sound manner. In addition to preparing employees to manage and maintain TSD and generator units under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should an emergency occur. The training plan also identifies specific individuals holding key waste management positions at B Plant Complex

  7. Environmental monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of the EMMP is: to identify, in consultation with the affected states and Indian tribes, potentially significant adverse environmental impacts that could result from site characterization activities, to describe data collection methods that will be used to monitor any such identified impacts, and procedures for mitigating them. Chapter 2 of the EMMP provides an overview of the background and scope of the document. Chapter 3 of the EMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construct the exploratory shafts and surface support facilities. The rationale for developing environmental monitoring studies is presented in Chapeter 4. Chapter 5 contains descriptions of the environmental monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the EMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 21 figs., 10 tabs

  8. Savannah River Site integrated stabilization management plan. Revision 3

    International Nuclear Information System (INIS)

    Geddes, R.L.; Barone, A.; Shook, H.E.; Varner, C.E.; Rollins, R.

    1996-01-01

    On May 26, 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 94-1. The concern is that the halt in production of materials to be used in nuclear weapons froze the manufacturing pipeline in a state that, for safety reasons, should not be allowed to persist unremediated. This recommendation had eight specific sub-recommendations that dealt with the potential problems. Specifically, the Board expressed concern about certain liquids and solids containing fissile materials and other radioactive substances located in spent fuel storage pools, reactor basins, reprocessing canyons; and various other facilities once used for processing and weapons manufacture. The WSRC and DOE-SR acknowledges and shares the Board's concerns and has developed this Integrated Stabilization Management Plan (ISMP) to aggressively address these urgent problems in a systems engineering approach

  9. C-018H LERF filtration test plan. Revision 1

    International Nuclear Information System (INIS)

    Moberg, T.P.; King, C.V.

    1994-01-01

    The following outlines the plan to test the polymeric backwash filtration system at the LERF. These tests will determine if the ETF filter design is adequate. If the tests show that the design is adequate, the task will be complete. If the tests show that the technology is inadequate, it may be necessary to perform further tests to qualify other candidate filtration technologies (e.g., polymeric tubular ultrafiltration, centrifugal ultrafiltration). The criteria to determine the success or failure of the backwash filter will be based on the system's ability to remove the bacteria and inorganic contaminants from the evaporator process condensate. The tests are designed to qualify the design basis of the filtration technology that will be used in the ETF

  10. C-018H LERF filtration test plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Moberg, T.P.; King, C.V.

    1994-08-26

    The following outlines the plan to test the polymeric backwash filtration system at the LERF. These tests will determine if the ETF filter design is adequate. If the tests show that the design is adequate, the task will be complete. If the tests show that the technology is inadequate, it may be necessary to perform further tests to qualify other candidate filtration technologies (e.g., polymeric tubular ultrafiltration, centrifugal ultrafiltration). The criteria to determine the success or failure of the backwash filter will be based on the system`s ability to remove the bacteria and inorganic contaminants from the evaporator process condensate. The tests are designed to qualify the design basis of the filtration technology that will be used in the ETF.

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 190: Contaminated Waste Sites, Nevada Test Site, Nevada, Revision 0

    International Nuclear Information System (INIS)

    Alfred Wickline

    2008-01-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 190, Contaminated Waste Sites, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (1996, as amended January 2007). Corrective Action Unit 190 is comprised of the following four corrective action sites (CASs): (1) 11-02-01, Underground Centrifuge; (2) 11-02-02, Drain Lines and Outfall; (3) 11-59-01, Tweezer Facility Septic System; (4) 14-23-01, LTU-6 Test Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 190 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from March 21 through June 26, 2007. All CAI activities were conducted as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites, Nevada Test Site, Nevada (NNSA/NSO, 2006). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 190 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the data quality objective data needs

  12. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Science.gov (United States)

    2010-05-26

    ...; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear Regulatory... Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093560837). The Office of Nuclear Security...

  13. Double-shell tank ultrasonic inspection plan. Revision 1

    International Nuclear Information System (INIS)

    Pfluger, D.C.

    1994-01-01

    The waste tank systems managed by the Tank Waste Remediation System Division of Westinghouse Hanford Company includes 28 large underground double-shell tanks (DST) used for storing hazardous radioactive waste. The ultrasonic (UT) inspection of these tanks is part of their required integrity assessment (WAC 1993) as described in the tank systems integrity assessment program plan (IAPP) (Pfluger 1994a) submitted to the Ecology Department of the State of Washington. Because these tanks hold radioactive waste and are located underground examinations and inspections must be done remotely from the tank annuli with specially designed equipment. This document describes the UT inspection system (DSTI system), the qualification of the equipment and procedures, field inspection readiness, DST inspections, and post-inspection activities. Although some of the equipment required development, the UT inspection technology itself is the commercially proven and available projection image scanning technique (P-scan). The final design verification of the DSTI system will be a performance test in the Hanford DST annulus mockup that includes the demonstration of detecting and sizing corrosion-induced flaws

  14. Seismic safety margin research program. Program plan, Revision I

    International Nuclear Information System (INIS)

    Smith, P.D.; Tokarz, F.J.; Bernreuter, D.L.; Cummings, G.E.; Chou, C.K.; Vagliente, V.N.

    1978-01-01

    The overall objective of the SSMRP is to develop mathematical models that realistically predict the probability of radioactive releases from seismically induced events in nuclear power plants. These models will be used for four purposes: (1) To perform sensitivity studies to determine the weak links in seismic methodology. The weak links will then be improved by research and development. (2) To estimate the probability of release for a plant. It is believed that the major difficulty in the program will be to obtain acceptably small confidence limits on the probability of release. (3) To estimate the conservatisms in the Standard Review Plan (SRP) seismic design methodology. This will be done by comparing the results of the SRP methodology and the methodology resulting from the research and development in (1). (4) To develop an improved seismic design methodology based on probability. The Phase I objective proposed in this report is to develop mathematical models which will accomplish the purposes No. 1 and No. 2 with simplified assumptions such as linear elastic analysis, limited assessment on component fragility (considering only accident sequences leading to core melt), and simplified safety system

  15. Development of a prototype plan for the effective closure of a waste disposal site in Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    Nyhan, J.; Barnes, F.

    1989-02-01

    The purpose of this study was to develop a prototype plan for the effective closure and stabilization of a semiarid low-level waste disposal site. This prototype plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos based on previous shallow land burial (SLB) field research both at the Los Alamos Experimental Engineered Test Facility (EETF), and at a waste disposal area at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems at Waste Disposal Area B having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that one of the two models tested represented soil moisture more accurately than the second model. The accuracy of modeling all of the parameters of the water balance equation was then evaluated using field data from the Integrated Systems Demonstration plots at the EETF. Optimized parameters were developed for one model to describe observed values of deep percolation, evapotranspiration, and runoff from the field plots containing an SLB trench cap configuration

  16. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5

  17. HWMA/RCRA Closure Plan for the Fluorinel Dissolution Process Makeup and Cooling and Heating Systems Voluntary Consent Order SITE-TANK-005 Action Plan Tank Systems INTEC-066, INTEC-067, INTEC-068, and INTEC-072

    Energy Technology Data Exchange (ETDEWEB)

    M.E. Davis

    2007-05-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards.

  18. HWMA/RCRA Closure Plan for the Fluorinel Dissolution Process Makeup and Cooling and Heating Systems Voluntary Consent Order SITE-TANK-005 Action Plan Tank Systems INTEC-066, INTEC-067, INTEC-068, and INTEC-072

    International Nuclear Information System (INIS)

    M.E. Davis

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the fluorinel dissolution process makeup and cooling and heating systems located in the Fluorinel Dissolution Process and Fuel Storage Facility (CPP-666), Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory Site, was developed to meet milestones established under the Voluntary Consent Order. The systems to be closed include waste piping associated with the fluorinel dissolution process makeup systems. This closure plan presents the closure performance standards and methods of achieving those standards

  19. Unit-specific contingency plan for the 183-H solar evaporation basins. Revision 1

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1996-03-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H solar evaporation basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  20. Unit-specific contingency plan for the 183-H Solar Evaporation Basins. Revision 2

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1997-01-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2010-07-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2011-06-01

    Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the location of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of

  3. Phase 1 sampling and analysis plan for the 304 Concretion Facility closure activities

    International Nuclear Information System (INIS)

    Adler, J.G.

    1994-01-01

    This document provides guidance for the initial (Phase 1) sampling and analysis activities associated with the proposed Resource Conservation and Recovery Act of 1976 (RCRA) clean closure of the 304 Concretion Facility. Over its service life, the 304 Concretion Facility housed the pilot plants associated with cladding uranium cores, was used to store engineering equipment and product chemicals, was used to treat low-level radioactive mixed waste, recyclable scrap uranium generated during nuclear fuel fabrication, and uranium-titanium alloy chips, and was used for the repackaging of spent halogenated solvents from the nuclear fuels manufacturing process. The strategy for clean closure of the 304 Concretion Facility is to decontaminate, sample (Phase 1 sampling), and evaluate results. If the evaluation indicates that a limited area requires additional decontamination for clean closure, the limited area will be decontaminated, resampled (Phase 2 sampling), and the result evaluated. If the evaluation indicates that the constituents of concern are below action levels, the facility will be clean closed. Or, if the evaluation indicates that the constituents of concern are present above action levels, the condition of the facility will be evaluated and appropriate action taken. There are a total of 37 sampling locations comprising 12 concrete core, 1 concrete chip, 9 soil, 11 wipe, and 4 asphalt core sampling locations. Analysis for inorganics and volatile organics will be performed on the concrete core and soil samples. Separate concrete core samples will be required for the inorganic and volatile organic analysis (VOA). Analysis for inorganics only will be performed on the concrete chip, wipe, and asphalt samples

  4. Heat Transfer Reactor Experiment (HTRE)-3 Container Storage Unit Resource Conservation Recovery Act closure plan

    International Nuclear Information System (INIS)

    Spry, M.J.

    1992-11-01

    This document describes the closure of the HTRE-3 Container Storage Unit under the requirements of the Resource Conservation and Recovery Act. The unit's location, size, history, and current status are described. The document also summarizes the decontamination and decommissioning efforts performed in 1983 and provides an estimate of,waste residues remaining in the HTRE-3 assembly. A risk evaluation was performed that demonstrates that the residue does not pose a hazard to public health or the environment. Based on the risk evaluation, it is proposed that the HTRE-3 Container Storage Unit be closed in its present condition, without further decontamination or removal activities

  5. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-06

    ...EPA is approving revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on April 26, 2012 and concerns oxides of nitrogen (NOX) from solid fuel fired boilers. We are approving a local rule that regulates these emission sources under the Clean Air Act (CAA or the Act).

  6. 77 FR 71129 - Revisions to the California State Implementation Plan, San Joaquin Valley United Air Pollution...

    Science.gov (United States)

    2012-11-29

    ...EPA is finalizing approval of revisions to the SJVUAPCD and SCAQMD portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on June 21, 2012 and concerns volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  7. Closure Report (CR) for Corrective Action Unit (CAU) 91: Area 3 U-3fi Injection Well with Errata Sheet and Certification, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Navarro Nevada Environmental Services

    2010-08-10

    The closure report for CAU 91 has no Use Restriction Form or drawing/map included in the document to describe the use restricted area, however, Section 3.3.3 states that the site will be fenced and signage placed indicating the area as a Resource Conservation and Recovery Act (RCRA) Unit. The drawing that was placed in the FFACO indicating the use restricted area lists the coordinates for the RCRA Unit in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner, which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the RCRA Unit with the coordinates listed showing the use restricted area.

  8. Closure certification report for the Bear Creek burial grounds B area and walk-in pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-06-01

    On July 5, 1993, the revised RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, DOE/OR/01-1100 ampersand D3 and Y/ER-53 ampersand D3, was approved by the Tennessee Department of Environment and Conservation (TDEC). The closure activities described in that closure plan have been performed. The purpose of this document is to summarize the closure activities for B Area and Walk-In Pits (WIPs), including placement of the Kerr Hollow Quarry debris at the WIPs

  9. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    S. E. Rawlinson

    2001-09-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  10. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  11. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  12. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  13. 75 FR 6413 - Office of New Reactors; Proposed Revision to Standard Review Plan, Section 14.3.12 on Physical...

    Science.gov (United States)

    2010-02-09

    ... Standard Review Plan, Section 14.3.12 on Physical Security Hardware Inspections, Tests, Analyses, and.... SUMMARY: The NRC is soliciting public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' on a proposed Revision 1 to Standard Review Plan (SRP...

  14. 75 FR 57055 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog

    Science.gov (United States)

    2010-09-17

    ...] Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for Utah Prairie Dog AGENCY: Fish... recovery plan for the Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened... and peer reviewers in an appendix to the approved recovery plan. The Utah prairie dog (Cynomys...

  15. Emergency evacuation/transportation plan update: Traffic model development and evaluation of early closure procedures. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-28

    Prolonged delays in traffic experienced by Laboratory personnel during a recent early dismissal in inclement weather, coupled with reconstruction efforts along NM 502 east of the White Rock Wye for the next 1 to 2 years, has prompted Los Alamos National Laboratory (LANL) to re-evaluate and improve the present transportation plan and its integration with contingency plans maintained in other organizations. Facilities planners and emergency operations staff need to evaluate the transportation system`s capability to inefficiently and safely evacuate LANL under different low-level emergency conditions. A variety of potential procedures governing the release of employees from the different technical areas (TAs) requires evaluation, perhaps with regard to multiple emergency-condition scenarios, with one or more optimal procedures ultimately presented for adoption by Lab Management. The work undertaken in this project will hopefully lay a foundation for an on-going, progressive transportation system analysis capability. It utilizes microscale simulation techniques to affirm, reassess and validate the Laboratory`s Early Dismissal/Closure/Delayed Opening Plan. The Laboratory is required by Federal guidelines, and compelled by prudent practice and conscientious regard for the welfare of employees and nearby residents, to maintain plans and operating procedures for evacuation if the need arises. The tools developed during this process can be used outside of contingency planning. It is anticipated that the traffic models developed will allow site planners to evaluate changes to the traffic network which could better serve the normal traffic levels. Changes in roadway configuration, control strategies (signalization and signing), response strategies to traffic accidents, and patterns of demand can be modelled using the analysis tools developed during this project. Such scenarios typically are important considerations in master planning and facilities programming.

  16. Digital Problems and Strategies of Partial Revision in Overall Plan of Land Use

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    The technical route of partial revision in overall plan of land use is briefly described.It is pointed out that problems of area measuring in the technical route are mainly due to the digital process.The digital problems of partial revision in overall plan of land use are presented as follows:the maps are not proofread before digitalization;the coordinate matching and projection transformation are not conducted on the maps;the information is asymmetrical pre and post the digitalization;the location lacks precision;the result maps are substandard.The causes of these problems are analyzed,which cover the following aspects.The lack of united management regulations;uneven working abilities of the staff in the compilation units;unawareness of the importance of map digilalization;poor basic conclitions of the original plan maps.At last,the relevant suggestions are put forward,for instance,releasing the national united management methods and technical criteria,establishing industrial admittance system and qualification system of complication units,setting up the mechanism of supervising digitalized results and controlling the quality,conducting coordinate matching and projection transformation and unifying the specification and mode of the results of maps so as to provide technical support for the overall plan of land use,play the micro-regulating role of land use and take a leading role in the sustainable development of social economy.

  17. Nuclear fuel reprocessing deactivation plan for the Idaho Chemical Processing Plant, Revision 1

    International Nuclear Information System (INIS)

    Patterson, M.W.

    1994-10-01

    The decision was announced on April 28, 1992 to cease all United States Department of Energy (DOE) reprocessing of nuclear fuels. This decision leads to the deactivation of all fuels dissolution, solvent extraction, krypton gas recovery operations, and product denitration at the Idaho Chemical Processing Plant (ICPP). The reprocessing facilities will be converted to a safe and stable shutdown condition awaiting future alternate uses or decontamination and decommissioning (D ampersand D). This ICPP Deactivation Plan includes the scope of work, schedule, costs, and associated staffing levels necessary to achieve a safe and orderly deactivation of reprocessing activities and the Waste Calcining Facility (WCF). Deactivation activities primarily involve shutdown of operating systems and buildings, fissile and hazardous material removal, and related activities. A minimum required level of continued surveillance and maintenance is planned for each facility/process system to ensure necessary environmental, health, and safety margins are maintained and to support ongoing operations for ICPP facilities that are not being deactivated. Management of the ICPP was transferred from Westinghouse Idaho Nuclear Company, Inc. (WINCO) to Lockheed Idaho Technologies Company (LITCO) on October 1, 1994 as part of the INEL consolidated contract. This revision of the deactivation plan (formerly the Nuclear Fuel Reprocessing Phaseout Plan for the ICPP) is being published during the consolidation of the INEL site-wide contract and the information presented here is current as of October 31, 1994. LITCO has adopted the existing plans for the deactivation of ICPP reprocessing facilities and the plans developed under WINCO are still being actively pursued, although the change in management may result in changes which have not yet been identified. Accordingly, the contents of this plan are subject to revision

  18. Prospects offered by the departmental plans inspection; Les perspectives offertes par la revision des plans departementaux

    Energy Technology Data Exchange (ETDEWEB)

    Thauvin, Ph.

    2000-07-01

    In the framework of the departmental plans inspection, a detailed document is presented on the domestic and industrial wastes management. These plans forecast an increase of the recycling facing the incineration, a mastership of the costs, a better application of the regulations and a campaign of public information. The indicators of control and the main points of these plans are discussed, supported by tables and definitions. (A.L.B.)

  19. 75 FR 36126 - Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on...

    Science.gov (United States)

    2010-06-24

    ... Standard Review Plan Section 13.6.1, Revision 1 on Physical Security--Combined License and Operating...), Section 13.6.1 on ``Physical Security--Combined License and Operating Reactors,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100350158). The Office of Nuclear Security and...

  20. 78 FR 12267 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Science.gov (United States)

    2013-02-22

    ...EPA is proposing a limited approval and limited disapproval of permitting rules submitted by California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). These rules were adopted by the PCAPCD and FRAQMD to regulate the construction and modification of stationary sources of air pollution within each District. EPA is proposing to approve these SIP revisions based on the Agency's conclusion that the rules are consistent with applicable Clean Air Act (CAA) requirements, policies and guidance. Final approval of these rules would make the rules federally enforceable and correct program deficiencies identified in a previous EPA rulemaking (76 FR 44809, July 27, 2011).

  1. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Science.gov (United States)

    2013-09-24

    ...EPA is finalizing a limited approval and limited disapproval of two permitting rules submitted by California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on February 22, 2013 and concern construction and modification of stationary sources of air pollution within each District. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA). Final approval of these rules makes the rules federally enforceable and corrects program deficiencies identified in a previous EPA rulemaking (76 FR 44809, July 27, 2011). EPA is also making a technical amendment to the Code of Federal Regulations (CFR) to reflect this previous rulemaking, which removed an obsolete provision from the California SIP.

  2. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  3. Program plan for shipment, receipt, and storage of the TMI-2 core. Revision 1

    International Nuclear Information System (INIS)

    Quinn, G.J.; Reno, H.W.; Schmitt, R.C.

    1985-01-01

    This plan addresses the preparation and shipment of core debris from Three Mile Island Unit 2 (TMI-2) to the Idaho National Engineering Laboratory (INEL) and receipt and storage of that core debris. The Manager of the Nuclear Materials Evaluation Programs Division of EG and G Idaho, Inc. will manage two separate but integrated programs, one located at TMI (Part 1) and the other at INEL (Part 2). The Technical Integration Office (at TMI) is responsible for developing and implementing Part 1, TMI-2 Core Shipment Program. The Technical Support Branch (at INEL) is responsible for developing and implementing Part 2, TMI-2 Core Receipt and Storage. The plan described herein is a revision of a previous document entitled Plan for Shipment, Storage, and Examination of TMI-2 Fuel. This revision was required to delineate changes, primarily in Part 2, Core Activities Program, of the previous document. That part of the earlier document related to core examination was reidentified in mid-FY-1984 as a separate trackable entity entitled Core Sample Acquisition and Examination Project, which is not included here

  4. Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1

    International Nuclear Information System (INIS)

    Prather, M.C.

    1994-11-01

    This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn't bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem

  5. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), we are approving local rules that define terms used in other air pollution regulation in these areas and approving a rule rescission that addresses Petroleum Coke Calcining Operations--Oxides of Sulfur.

  6. 76 FR 44809 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-07-27

    ...EPA is finalizing a limited approval and limited disapproval of permitting rules submitted for the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portions of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on May 19, 2011 and concern New Source Review (NSR) permit programs for new and modified major stationary sources of air pollution. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  7. 78 FR 23677 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2013-04-22

    ...EPA is finalizing approval of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on January 7, 2013 and concerns local rules that regulate inhalable particulate matter (PM) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and agricultural areas in Imperial County. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  8. 77 FR 2643 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Science.gov (United States)

    2012-01-19

    ...EPA is finalizing a limited approval and limited disapproval of revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on September 6, 2011 and concerns oxides of nitrogen (NOX) emissions from biomass fuel-fired boilers. Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), this action simultaneously approves a local rule that regulates these emission sources and directs California to correct rule deficiencies.

  9. Children's high-level writing skills: development of planning and revising and their contribution to writing quality.

    Science.gov (United States)

    Limpo, Teresa; Alves, Rui A; Fidalgo, Raquel

    2014-06-01

    It is well established that the activity of producing a text is a complex one involving three main cognitive processes: Planning, translating, and revising. Although these processes are crucial in skilled writing, beginning and developing writers seem to struggle with them, mainly with planning and revising. To trace the development of the high-level writing processes of planning and revising, from Grades 4 to 9, and to examine whether these skills predict writing quality in younger and older students (Grades 4-6 vs. 7-9), after controlling for gender, school achievement, age, handwriting fluency, spelling, and text structure. Participants were 381 students from Grades 4 to 9 (age 9-15). Students were asked to plan and write a story and to revise another story by detecting and correcting mechanical and substantive errors. From Grades 4 to 9, we found a growing trend in students' ability to plan and revise despite the observed decreases and stationary periods from Grades 4 to 5 and 6 to 7. Moreover, whereas younger students' planning and revising skills made no contribution to the quality of their writing, in older students, these high-level skills contributed to writing quality above and beyond control predictors. The findings of this study seem to indicate that besides the increase in planning and revising, these skills are not fully operational in school-age children. Indeed, given the contribution of these high-level skills to older students' writing, supplementary instruction and practice should be provided from early on. © 2013 The British Psychological Society.

  10. Drop Tests Results Of Revised Closure Bolt Configuration Of The Standard Waste Box, Standard Large Box 2, And Ten Drum Overpack Packagings

    International Nuclear Information System (INIS)

    May, C.; Opperman, E.; Mckeel, C.

    2010-01-01

    The Transuranic (TRU) Disposition Project at Savannah River Site will require numerous transfers of radioactive materials within the site boundaries for sorting and repackaging. The three DOT Type A shipping packagings planned for this work have numerous bolts for securing the lids to the body of the packagings. In an effort to reduce operator time to open and close the packages during onsite transfers, thus reducing personnel exposure and costs, an evaluation was performed to analyze the effects of reducing the number of bolts required to secure the lid to the packaging body. The evaluation showed the reduction to one-third of the original number of bolts had no effect on the packagings capability to sustain vibratory loads, shipping loads, internal pressure loads, and the loads resulting from a 4-ft drop. However, the loads caused by the 4-ft drop are difficult to estimate and the study recommended each of the packages be dropped to show the actual effects on the package closure. Even with reduced bolting, the packagings were still required to meet the 49 CFR 178.350 performance criteria for Type A packaging. This paper discusses the effects and results of the drop testing of the three packagings.

  11. 76 FR 23630 - Office of New Reactors; Proposed Revision 2 to Standard Review Plan, Section 1.0 on Introduction...

    Science.gov (United States)

    2011-04-27

    ... Standard Review Plan, Section 1.0 on Introduction and Interfaces AGENCY: Nuclear Regulatory Commission (NRC... Revision 2 to Standard Review Plan (SRP), Section 1.0, ``Introduction and Interfaces'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110110573). The Office of New Reactors (NRO...

  12. 76 FR 31381 - Office Of New Reactors; Proposed Revision 4 to Standard Review Plan; Section 8.1 on Electric...

    Science.gov (United States)

    2011-05-31

    ... Standard Review Plan; Section 8.1 on Electric Power--Introduction AGENCY: U.S. Nuclear Regulatory...,'' on a proposed Revision 4 to Standard Review Plan (SRP), Section 8.1 on ``Electric Power--Introduction,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111180542). The previous version of...

  13. 75 FR 15723 - Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Mariana Fruit...

    Science.gov (United States)

    2010-03-30

    ... Wildlife Service, announce the availability of the Draft Revised Recovery Plan for the Mariana Fruit Bat or... and assistance of a Recovery Team appointed by the U.S. Fish and Wildlife Service. Section 4(f) of the... life history and ecology, this recovery plan focuses on the first 10 years of the recovery process. As...

  14. 76 FR 38575 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Northern Spotted Owl...

    Science.gov (United States)

    2011-07-01

    ... document availability: revised recovery plan. SUMMARY: We, the U.S. Fish and Wildlife Service, announce the... concluded that the integrity of the agency decisionmaking process for the spotted owl recovery plan was... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service 50 CFR Part 17 [FWS-R1-ES-2011-N020; 10120...

  15. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District...

  16. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  17. 77 FR 24975 - Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Utah Prairie Dog

    Science.gov (United States)

    2012-04-26

    ...-FF06E00000] Endangered and Threatened Wildlife and Plants; Revised Recovery Plan for the Utah Prairie Dog... Utah prairie dog (Cynomys parvidens). This species is federally listed as threatened under the... recovery plan for the Utah prairie dog. The Service and other Federal agencies also will take these...

  18. RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988

  19. Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan

    International Nuclear Information System (INIS)

    1996-07-01

    The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98

  20. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  1. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    International Nuclear Information System (INIS)

    Sweeney, M.D.

    1995-01-01

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations

  2. 76 FR 28944 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-05-19

    ...EPA is proposing a limited approval and limited disapproval of permitting rules submitted for the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). The districts are required under Part D of title I of the Clean Air Act (CAA) to adopt and implement a SIP-approved New Source Review (NSR) permit program. These rules update and revise the District's NSR permitting program for new and modified sources of air pollution. If EPA finalizes the limited approval and limited disapproval action, as proposed, then a sanctions clock would be triggered. We are taking comments on this proposal and plan to follow with a final action.

  3. Revising superior planning performance in chess players: the impact of time restriction and motivation aspects.

    Science.gov (United States)

    Unterrainer, Josef Martin; Kaller, Christoph Philipp; Leonhart, Rainer; Rahm, Benjamin

    2011-01-01

    In a previous study (Unterrainer, Kaller, Halsband, & Rahm, 2006), chess players outperformed non-chess players in the Tower of London planning task but exhibited disproportionately longer processing times. This pattern of results raises the question of whether chess players' planning capabilities are superior or whether the results reflect differences in the speed-accuracy trade-off between the groups, possibly attributable to sports motivation. The present study was designed to disambiguate these alternative suggestions by implementing various constraints on planning time and by assessing self-reported motivation. In contrast to the previous study, chess players' performance was not superior, independently of whether problems had to be solved with (Experiment 1) or without (Experiment 2) time limits. As expected, chess players reported higher overall trait and state motivation scores across both experiments. These findings revise the notion of superior planning performance in chess players. In consequence, they do not conform with the assumption of a general transfer of chess-related planning expertise to other cognitive domains, instead suggesting that superior performance may be possible only under specific circumstances such as receiving competitive instructions.

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2011-09-01

    Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to

  5. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Krenzien, Susan [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-06-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  6. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Krenzien, Susan [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2012-10-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  7. Base Closure and Realignment Act (BRAC) Cleanup Plan, Sacramento Army Depot, Sacramento, California

    Science.gov (United States)

    1995-10-01

    Treatment System. April 5. Levy, R. 1978. Eastern Miwok. In Handbook of North American Indians. Volume 8: California, (R.F. Heizer , ed.) pp. 398-413... Heizer , pp. 389-387. Smithsonian Institution, Washington, D.C. Wirth Environmental Services. 1983. An archaeological overview and management plan for the...water quality which, if reached, are expected to render a body of water suitable for its designated use. The criteria are based on specific levels of

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick and Sloop, Christy

    2011-04-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high

  9. Corrective Action Decision Document/Closure Report for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Matthews

    2011-08-01

    Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities were performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that

  10. Effects of the Original Versus Revised Bloom's Taxonomy on Lesson Planning Skills: A Turkish Study Among Pre-Service Teachers

    Science.gov (United States)

    Bümen, Nilay T.

    2007-07-01

    The original taxonomy of educational objectives, developed by Benjamin S.␣Bloom and his associates in the 1950s, was revised several decades later by a group of educationists and cognitive psychologists, who developed a revised taxonomy (RT). This article describes a Turkish study carried out among a group of pre-service teachers in order to compare the influence of the two systems on lesson planning skills. The results confirmed other studies that have indicated a number of advantages of the revised system over the earlier one.

  11. RCRA closure of eight land-based units at the Y-12 plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Welch, S.H.

    1988-01-01

    Eight land-based hazardous waste management units at the Oak Ridge Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of risk assessments and the preparation of an integrated schedule

  12. Survey of ANL organization plans for word processors, personal computers, workstations, and associated software. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Fenske, K.R.; Rockwell, V.S.

    1992-08-01

    The Computing and Telecommunications Division (CTD) has compiled this Survey of ANL Organization plans for Word Processors, Personal Computers, Workstations, and Associated Software (ANL/TM, Revision 4) to provide DOE and Argonne with a record of recent growth in the acquisition and use of personal computers, microcomputers, and word processors at ANL. Laboratory planners, service providers, and people involved in office automation may find the Survey useful. It is for internal use only, and any unauthorized use is prohibited. Readers of the Survey should use it as a reference document that (1) documents the plans of each organization for office automation, (2) identifies appropriate planners and other contact people in those organizations and (3) encourages the sharing of this information among those people making plans for organizations and decisions about office automation. The Survey supplements information in both the ANL Statement of Site Strategy for Computing Workstations (ANL/TM 458) and the ANL Site Response for the DOE Information Technology Resources Long-Range Plan (ANL/TM 466).

  13. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP

  14. Addendum to the Closure Report for Corrective Action Unit 411: Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Burmeister, Mark [Navarro, Las Vegas, NV (United States)

    2016-11-01

    The Corrective Action Unit (CAU) 411 Closure Report (CR) was published in June 2016 (NNSA/NFO, 2016). The purpose of this addendum is to clarify language in the CR relating to the field instrument for the detection of low-energy radiation (FIDLER), provide the waste disposal documentation for waste generated during the corrective action investigation (CAI), and reference a letter from the U.S. Air Force (USAF) regarding the closure of CAU 411.

  15. Road Closures

    Data.gov (United States)

    Montgomery County of Maryland — This is an up to date map of current road closures in Montgomery County.This dataset is updated every few minutes from the Department of Transportation road closure...

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 545: Dumps, Waste Disposal Sites, and Buried Radioactive Materials Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alfred Wickline

    2008-04-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 545, Dumps, Waste Disposal Sites, and Buried Radioactive Materials, in Areas 2, 3, 9, and 20 of the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (1996, as amended February 2008). Corrective Action Unit 545 is comprised of the following eight Corrective Action Sites (CASs): • 02-09-01, Mud Disposal Area • 03-08-03, Mud Disposal Site • 03-17-01, Waste Consolidation Site 3B • 03-23-02, Waste Disposal Site • 03-23-05, Europium Disposal Site • 03-99-14, Radioactive Material Disposal Area • 09-23-02, U-9y Drilling Mud Disposal Crater • 20-19-01, Waste Disposal Site While all eight CASs are addressed in this CADD/CR, sufficient information was available for the following three CASs; therefore, a field investigation was not conducted at these sites: • For CAS 03-08-03, though the potential for subsidence of the craters was judged to be extremely unlikely, the data quality objective (DQO) meeting participants agreed that sufficient information existed about disposal and releases at the site and that a corrective action of close in place with a use restriction is recommended. Sampling in the craters was not considered necessary. • For CAS 03-23-02, there were no potential releases of hazardous or radioactive contaminants identified. Therefore, the Corrective Action Investigation Plan for CAU 545 concluded that: “Sufficient information exists to conclude that this CAS does not exist as originally identified. Therefore, there is no environmental concern associated with CAS 03-23-02.” This CAS is closed with no further action. • For CAS 03-23-05, existing information about the two buried sources and lead pig was considered to be

  17. Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

  18. Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Grant Evenson

    2008-09-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit 556, Dry Wells and Surface Release Points, located at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 556 is comprised of four corrective action sites (CASs): • 06-20-04, National Cementers Dry Well • 06-99-09, Birdwell Test Hole • 25-60-03, E-MAD Stormwater Discharge and Piping • 25-64-01, Vehicle Washdown and Drainage Pit The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 556 with no further corrective action. To achieve this, corrective action investigation (CAI) activities began on February 7 and were completed on June 19, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 556 data were evaluated based on the data quality assessment process, which demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 556 that required the completion of a corrective action. Assessment of the data generated from investigation activities conducted at CAU 556 revealed the following: • Corrective Action Sites 06-20-04, 06-99-09, and 25-64-01 do not contain contamination at

  19. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  20. Revision of the basic plans of the first nuclear-powered ship development

    International Nuclear Information System (INIS)

    1978-01-01

    Along with the law for Japan Nuclear Ship Development Agency, the basic plans of development of the first nuclear-powered ship have been revised. After explaining the basic policy concerning the matter, the development program is described as follows: ship type/kind, nuclear power plant, construction, training of ship crew, experimental voyage, compilation of the development results, and works after the experimental voyage. The first nuclear-powered ship of about 8,000 tons gross tonnage, 10,000 horsepower main engine output, and about 16 knots, sea speed will be the ship for special cargo transport and crew training. A pressurized water reactor is used for the power plant. Following the repair of shielding and the overall inspection of safety, the ship is to be completed as early as possible. After completion of the ship, its experimental voyage will be carried out, aiming at the aspects of operational familiarization, ship performance, reliability, port call experience, etc. (Mori, K

  1. Revised Fifth Five Year Economic and Social Development Plan, 1984-1986.

    Science.gov (United States)

    1987-01-01

    This document contains provisions of chapter 6 (Promoting Social Development) of the Revised Fifth Five-Year Economic and Social Development Plan (1984-86) of the Republic of Korea. The plan calls for the efficient control of population growth by targeting intensive efforts to women 20-30 years old, eradicating the traditional preference for male children, providing incentives to foster a small family norm, and discouraging couples from having too many children. Family planning (FP) programs will be expanded to increase the contraceptive prevalence rate and improve the quality of contraceptive services. Emphasis will be placed on women 34 years or younger residing in poor urban and remote rural areas. The emphasis of the evaluations of FP guidance and evaluation teams will be on the actual prevention of birth rather than on the contraceptive use ratio, and the FP program will be linked to other health and medical schemes. Families with 2 children or less will receive extended medical services and free kindergarten tuition. Families with 3 or more children may face discriminatory policy measures. The Family Law will be amended to allow daughters to inherit, the Medical Insurance Law will be changed to allow family members dependent upon female workers to be insured, and social institutions hindering female participation in the work force will be banned. The dissemination of FP information and population education will be expanded.

  2. Westinghouse Hanford Company plan for certifying newly generated contact -- handled transuranic waste. Revision 1

    International Nuclear Information System (INIS)

    Lipinski, R.M.; Backlund, E.G.

    1995-09-01

    All transuranic (TRU) waste generators are required by US Department of Energy (DOE) Order 5820.2A to package their TRU waste in order to comply wit the Waste Isolation Pilot Plant (WIPP) -- Waste Acceptance Criteria (WAC) or keep non-certifiable containers segregated. The Westinghouse Hanford Company (WHC) Transuranic Waste Certification Plan was developed to ensure that TRU newly generated waste at WHC meets the DOE Order 5820.2A and the WHC-WAC which includes the State of Washington Department of Ecology -- Washington Administrative Code (DOE-WAC). The metho used at WHC to package TRU waste are described in sufficient detail to meet the regulations. This document is organized to provide a brief overview of waste generation operations at WHC. The methods used to implement this plan are discussed briefly along with the responsibilities and authorities of applicable organizations. This plan describes how WHC complies with all applicable regulations and requirements set forth in the latest approved revision of WHC-EP-0063-4

  3. Bioconversion of plant biomass to ethanol. Annual report and revised research plan, January 1977--January 1978

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, R.E.; Bellamy, W.D.; Su, T.M.

    1978-03-23

    The objective of this research is to demonstrate on a laboratory scale the technical feasibility of the direct microbial conversion of pretreated wood to ethanol. During the first year of this contract, we investigated the feasibility of biologically delignifying wood with C. pruinosum and directly fermenting the pretreated wood to ethanol with a mixed culture. Bench-top fermentations of a thermophilic bacillus growing on glucose and of a mixed culture of thermophilic sporocytophaga (US) and a thermophilic bacillus growing on microcrystalline and amorphous cellulose were evaluated for growth and ethanol production. In the mixed culture fermentation of amorphous and microcrystalline cellulose, the specific rate of substrate depletion was calculated to be 0.087 hr/sup -1/ and 0.0346 hr/sup -1/, respectively. However, defining the growth requirements of C. pruinosum and sporocytophaga (US) proved more difficult than originally anticipated. In order to achieve the program objectives within the contract period, a revised research plan was developed based upon chemical pretreatment and the direct fermentation of pretreated hardwood to ethanol. In place of the biological delignification pretreatment step, we have substituted a chemically supplemented steam pretreatment step to partially delignify wood and to enhance its accessibility to microbial utilization. Clostridium thermocellum, which ferments cellulose directly to ethanol and acetic acid, has replaced the mixed culture fermentation stage for ethanol production. Research on the production of ethanol from xylose by the thermophilic bacillus ZB-B2 is retained as one means of utilizing the hemicellulose fraction of hardwood. Work on the genetic improvement of the ethanol yields of both cultures by suppressing acetic acid production is also retained. The rationale, experimental approach, and economic considerations of this revised research plan are also presented.

  4. Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0

    International Nuclear Information System (INIS)

    Olson, A.L.; Nacht, S.J.

    1997-11-01

    This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Environmental Protection Agency (EPA) Farm Laboratory Building 15-06 located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is part of the Environmental Restoration Project managed by the U.S. Department of Energy/Nevada Operations Office (DOE/NV) under the Decontamination and Decommissioning (D ampersand D) Subproject which serves to manage and dispose of surplus facilities at the NTS in a manner that will protect personnel, the public, and the environment. It is identified as Corrective Action Unit (CAU) 95 in Appendix III of the Federal Facilities Agreement and Consent Order (FFACO). In July 1997, the DOE/NV verbally requested approval from the Nevada Division of Environmental Protection (NDEP) for the closure schedule to be accelerated. Currently, field activities are anticipated to be completed by September 30, 1997. In order to meet this new schedule NDEP has agreed to review this document as expeditiously as possible. Comments will be addressed in the Closure Report after field activities have been completed, unless significant issues require resolution during closure activities

  5. Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0

    Energy Technology Data Exchange (ETDEWEB)

    Olson, A.L.; Nacht, S.J.

    1997-11-01

    This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Environmental Protection Agency (EPA) Farm Laboratory Building 15-06 located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is part of the Environmental Restoration Project managed by the U.S. Department of Energy/Nevada Operations Office (DOE/NV) under the Decontamination and Decommissioning (D&D) Subproject which serves to manage and dispose of surplus facilities at the NTS in a manner that will protect personnel, the public, and the environment. It is identified as Corrective Action Unit (CAU) 95 in Appendix III of the Federal Facilities Agreement and Consent Order (FFACO). In July 1997, the DOE/NV verbally requested approval from the Nevada Division of Environmental Protection (NDEP) for the closure schedule to be accelerated. Currently, field activities are anticipated to be completed by September 30, 1997. In order to meet this new schedule NDEP has agreed to review this document as expeditiously as possible. Comments will be addressed in the Closure Report after field activities have been completed, unless significant issues require resolution during closure activities.

  6. Planned revision to DOE Order 5820.2A, Radioactive Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G.J. [Dept. of Energy, Washington, DC (United States); Williams, R.E.; Kudera, D.E. [EG and G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Bailey, D.E. [NJG, Inc. (United States)

    1993-03-01

    US Department of Energy Headquarters initiated efforts to revise DOE Order 5820.2A, ``Radioactive Waste Management``. The purpose of the revision is to enhance DOE waste management requirements, reflect new DOE organizational responsibilities, and consolidate requirements for management of all waste, under the responsibility of Environmental Restoration and Waste Management, into a single order. This paper discusses the revision philosophy, objectives of the revision, and strategy for the revision. Issues being considered for inclusion in the revision and recommended methods of resolving each issue are also discussed.

  7. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas.

  8. Long-term surveillance plan for the Falls City Disposal Site, Falls City, Texas. Revision 2

    International Nuclear Information System (INIS)

    1996-11-01

    The need for ground water monitoring at the Falls City disposal site was evaluated in accordance with NRC regulations and guidelines established by the DOE in Guidance for Implementing the Long-term Surveillance Program for UMTRA Project Title 1 Disposal Sites (DOE, 1996). Based on evaluation of site characterization data, it has been determined that a program to monitor ground water for demonstration of disposal cell performance based on a set of concentration limits is not appropriate because ground water in the uppermost aquifer is of limited use, and a narrative supplemental standard has been applied to the site that does not include numerical concentration limits or a point of compliance. The limited use designation is based on the fact that ground water in the uppermost aquifer is not currently or potentially a source of drinking water in the area because it contains widespread ambient contamination that cannot be cleaned up using methods reasonably employed by public water supply systems. Background ground water quality varies by orders of magnitude since the aquifer is in an area of redistribution of uranium mineralization derived from ore bodies. The DOE plans to perform post-closure ground water monitoring in the uppermost aquifer as a best management practice (BMP) as requested by the state of Texas

  9. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    International Nuclear Information System (INIS)

    Bechtel Nevada

    2005-01-01

    This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site. This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site (NTS). The Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) are managed and operated by Bechtel Nevada (BN) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Integrated Closure and Monitoring Plan (ICMP) for these sites is based on guidance for developing closure plans issued by the DOE (DOE, 1999a). The plan does not closely follow the format suggested by the DOE guidance to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. Further, much of the information that would be included in the individual plans is the same, and integration provides efficient presentation. A cross-walk between the contents of the ICMP and the DOE guidance is given in Appendix A. Closure and monitoring were integrated because monitoring measures the degree to which the operational and closed disposal facilities are meeting performance objectives specified in the manual to DOE Order O 435.1. Department of Energy Order 435.1 governs management of radioactive waste, and associated with it are Manual DOE M 435.1-1 and Guidance DOE G 435.1-1. The performance objectives are intended to ensure protection of workers, the public, and the environment from radiological exposure associated with the RWMSs now and in the future

  10. Closure Report for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR) Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    Energy Technology Data Exchange (ETDEWEB)

    Sloop, Christina

    2017-12-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.

  11. Standard Review Plan for the review of safety analysis reports for nuclear power plants, Revision No. 7 to Section 9

    International Nuclear Information System (INIS)

    1978-03-01

    Revision No. 1 to Section 9 of the Standard Review Plan incorporates changes that have been developed since the original issuance in September 1975, many of which are editorial in nature, to reflect current staff practice in the review of safety analysis reports for nuclear power plants

  12. 76 FR 55581 - Revision to the California State Implementation Plan; Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan; Yolo-Solano Air Quality Management District AGENCY: Environmental... revision to the Yolo-Solano Air Quality Management District portion of the California State Implementation...-Solano Air Quality Management District (YSAQMD) Rule 2.41, adopted on September 10, 2008, and submitted...

  13. 77 FR 23133 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (Yolo-Solano AQMD) portion of the.... * * * * * (381) * * * (i) * * * (I) Yolo-Solano Air Quality Management District. (1) Rule 2.3, ``Ringelmann Chart...

  14. 78 FR 47241 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the...

    Science.gov (United States)

    2013-08-05

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the Human Health Water Quality Criteria for PCBs in Zones 2... hold a public hearing to receive comments on proposed amendments to the Commission's Water Quality...

  15. 76 FR 53482 - Endangered and Threatened Wildlife and Plants; Notice of Availability of a Revised Recovery Plan...

    Science.gov (United States)

    2011-08-26

    ... and revised the recovery plan accordingly. The desert tortoise is a large, herbivorous reptile that... tortoise populations. Disease and increased incidence of fire in the Mojave Desert have also been... tortoises, there are few data available to evaluate or quantify the effects of threats on desert tortoise...

  16. Planning the Marketing Strategy. PACE Revised. Level 3. Unit 6. Research & Development Series No. 240CB6.

    Science.gov (United States)

    Ashmore, M. Catherine; Pritz, Sandra G.

    This individualized, competency-based unit on planning marketing strategy, the sixth of 18 modules, is on the third level of the revised Program for Acquiring Competence in Entrepreneurship (PACE). Intended for the advanced secondary and postsecondary levels and for adults wanting training or retraining, this unit, together with the other…

  17. Planning the Marketing Strategy. PACE Revised. Level 2. Unit 6. Research & Development Series No. 240BB6.

    Science.gov (United States)

    Ashmore, M. Catherine; Pritz, Sandra G.

    This unit on planning marketing strategy for a small business, the sixth in a series of 18 modules, is on the second level of the revised PACE (Program for Acquiring Competence in Entrepreneurship) comprehensive curriculum. Geared to advanced secondary and beginning postsecondary or adult students, the modules provide an opportunity to learn about…

  18. Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2016-08-01

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impacted groundwater

  19. Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

    International Nuclear Information System (INIS)

    Farnham, Irene

    2016-01-01

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impacted groundwater

  20. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  1. 40 CFR Appendix A to Subpart III... - States With Approved State Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units

    Science.gov (United States)

    2010-07-01

    ... Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units A Appendix A to Subpart III of Part 97 Protection... BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR SO2 Opt-in Units Pt. 97, Subpt. III... Concerning CAIR SO2 Opt-In Units 1. The following States have State Implementation Plan revisions under § 51...

  2. Revised ground-water monitoring compliance plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    1986-09-01

    This document contains ground-water monitoring plans for a mixed waste storage facility located on the Hanford Site in southeastern Washington State. This facility has been used since 1973 for storage of mixed wastes, which contain both chemicals and radionuclides. The ground-water monitoring plans presented here represent revision and expansion of an effort in June 1985. At that time, a facility-specific monitoring program was implemented at the 183-H Basins as part of the regulatory compliance effort being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interimstatus facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The program initially implemented for the 183-H Basins was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. This effort, named the RCRA Compliance Ground-Water Monitoring Project for the 183-H Basins, was implemented. A supporting project involving ground-water flow modeling for the area surrounding the 183-H Basins was also initiated during 1985. Those efforts and the results obtained are described in subsequent chapters of this document. 26 refs., 55 figs., 14 tabs

  3. Implementing the 2012 North American Waterfowl Management Plan revision: Populations, habitat, and people

    Science.gov (United States)

    Humburg, Dale D.; Anderson, Michael G.; Brasher, Michael G.; Carter, Michael F.; Eadie, John M.; Fulton, David C.; Johnson, Fred A.; Runge, Michael C.; Vrtiska, Mark P.

    2018-01-01

    The North American Waterfowl Management Plan (NAWMP) has established a model for wildlife conservation planning over the last 3 decades. Management at a continental scale, leveraged funding, regional partnerships, and a strong science basis have been notable features. Periodic updates to the NAWMP occurred since implementation in 1986; however, a fundamental revision was accomplished in 2012 after extensive stakeholder engagement. An explicit fundamental goal for waterfowl conservation supporters was added in 2012, complementing existing goals for sustainable populations and sufficient habitat found in previous updates. We present a synopsis of progress toward implementation of the 2012 NAWMP and challenge the waterfowl management community to continue with meaningful steps toward achieving NAWMP goals. Adding goals and objectives for supporters increases potential relevance of NAWMP; however, it also presents a level of complexity that was not entirely anticipated. Additionally, the 2012 NAWMP recognized that traditional support from waterfowl hunters alone will not be sufficient to support waterfowl conservation in the future. Simultaneous consideration of multiple objectives, although implicit before, now is a specific focus for habitat and harvest management affecting hunters and other users of the waterfowl resource. The waterfowl management community is faced with revisiting objectives and management actions related to harvest regulations, landscape priorities, habitat conservation, and public engagement to garner broader support. These persistent management challenges are tangible and relevant candidates for greater integration. Ultimately, the structures and processes supporting waterfowl management also will need to be reconsidered.

  4. Groundwater Monitoring Plan for the Z-Area Saltstone Disposal Facility, Revision 3

    International Nuclear Information System (INIS)

    WELLS, DANIEL

    2005-01-01

    Groundwater monitoring has been conducted at the Z-Area Saltstone Disposal Facility since 1987. At that time, groundwater monitoring was not required by the industrial landfill regulations, but a modest monitoring program was required by the operating permit. At the time of the 1996 permit renewal, it was determined that a more robust monitoring program was needed. The draft permit required new monitoring wells within 25 feet of each active disposal cell. As an alternative, SRS proposed a program based on direct push sampling. This program called for biennial direct push sampling within 25 feet of each waste-containing cell with additional samples being taken in areas where excessive cracking had been observed. The direct push proposal was accepted by The South Carolina Department of Health and Environmental Control (SCDHEC), and was incorporated by reference into the Z-Area Saltstone Industrial Solid Waste Permit, No.025500-1603. The Industrial Solid Waste Landfill Regulations were revised in 1998 and now include specific requirements for groundwater monitoring. SRS's plan for complying with those regulations is discussed below. The plan calls for a return to traditional monitoring with permanent wells. It also proposes a more technically sound monitoring list based on the actual composition of saltstone

  5. Planning and management of uranium mine and mill closures. Proceedings of a technical committee meeting held in Liberec, Czech Republic, 3-6 May 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Technical Committee Meeting on Planning and Management of Uranium Mine and Mill Closures was held in Liberec, Czech Republic from 3 to 6 May 1994. A total of 30 participants from nine countries attended the meeting. Nineteen papers were presented. Most of these papers dealt with the concept of and experiences in planning for and the subsequent decommissioning and rehabilitation of uranium mines and mills in Australia, Canada, Czech Republic, Germany, Romania, Slovenia, Spain and the USA. Two papers discussed the government`s role and relevant regulations related to the closures, decommissioning and remediation of uranium production facilities. Of particular interest to the participants was a non-technical paper presented by the Mayor of the city of Andujar, Spain, describing the negative political and socio-economic impacts associated with closure and decommissioning of an uranium mine/mill facility. The highlights of the meeting were the field visits to the uranium production facilities and rehabilitation programme sites of DIAMO and WISMUT companies, located respectively in Straz, Czech Republic and Koenigstein, Germany. Refs, figs and tabs.

  6. Looking Back to Move Forward: Collaborative Planning to Revise the Green Mountain and Finger Lakes National Forests Land and Resource Management Plans

    Directory of Open Access Journals (Sweden)

    Michael J Dockry

    2015-07-01

    Full Text Available The United States Department of Agriculture Forest Service (Forest Service manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting to incorporate innovative, collaborative public involvement strategies into the process for revising forest plans. In 2012 and 2015 the Forest Service codified new regulations for developing, revising, and amending forest plans. Collaboration and public involvement are explicit goals of the new regulations. This paper briefly reviews the literature on collaborative planning on national forests and explores a successful collaborative planning process used by the Green Mountain and Finger Lakes National Forests, located in Vermont and New York respectively, to develop their 2006 forest plans. This paper shows how the Green Mountain and Finger Lakes National Forests developed parallel public and internal collaborative processes to build trust, relationships, and partnership, and discusses the implications for process design, capacity building, and facilitating agreements. By looking back at this successful case of collaborative forest planning, key lessons can provide ideas for developing collaborative processes for future planning efforts.

  7. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada Test Site, Nevada, Revision 1

    International Nuclear Information System (INIS)

    2008-01-01

    -posting requirements for the mounded/capped basement structure, as well as for the entire CAU, are addressed in Section 4.2.10. The site contains radiologically impacted surfaces and hazardous materials. Based on review of the historical information for CAU 116 and recent site inspections, there is sufficient process knowledge to close CAU 116 using the SAFER process. CAUs that may be closed using the SAFER process have conceptual corrective actions that are clearly identified. Consequently, corrective action alternatives can be chosen prior to completing a corrective action investigation, given anticipated investigation results. The SAFER process combines elements of the data quality objective (DQO) process and the observational approach to plan and conduct closure activities. The DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the SAFER process. The purpose of the investigation phase is to verify the adequacy of existing information used to determine the chosen corrective action. The observational approach provides a framework for managing uncertainty during the planning and decision-making phases of the project. The SAFER process allows for technical decisions to be made based on information gathered during site visits, interviews, meetings, research, and a consensus of opinion by the decontamination and decommissioning (D and D) team members. Any uncertainties are addressed by documented assumptions that are verified by sampling and analysis, data evaluation, onsite observations, and contingency plans, as necessary. Closure activities may proceed simultaneously with site characterization as sufficient data are gathered to confirm or disprove the assumptions made during selection of the corrective action. If, at any time during the closure process, new information is discovered that indicates that closure activities should be revised, closure activities will be reevaluated as appropriate. Based on a

  8. Test plan for determining breathing rates in single shell tanks using tracer gases. Revision 1

    International Nuclear Information System (INIS)

    Andersen, J.A.

    1997-01-01

    This test plan specifies the requirements and conditions for the injection of tracer gas (Helium (He)) into single shell tanks to determine breathing rates using periodic sampling. The eight tanks which have been selected at the time this Test Plan was developed are A-101, AX-102, AX-103, BY-105, C-107, U-103 (U-103 is counted twice, once during the winter months and once during the summer), and U-105. Other tanks to be sampled will be assigned by Pacific Northwest National Laboratory (PNNL) at a later date in the study process as resources allow, the document shall be revised as required. The sampling of headspace for each of these tanks shall be performed using available risers or the Standard Hydrogen Monitoring System (SHMS) cabinet as available. The tank farm vapor cognizant engineer shall assign the injection and sample testing point for each tank and document the point in the field work package. SUMMA TMI canisters, equipped in-line with dual particulate air filters and two silica gel sorbent traps will be used to collect the gas samples. The purpose of dual particulate air filters is to ensure no radioactive particulates are transferred to the SUMMA TMI canisters. The silica gel sorbent traps will effectively eliminate any tritiated water vapor that may be present in the sample gas stream. PNNL shall supply the tracer gases injection system and shall perform the analysis on the headspace samples. TWRS Characterization project shall inject the tracer gas and perform the sampling. Refer to Engineering Task Plan HNF-SD-TWR-ETP-002 for a detailed description of the responsibilities for this task

  9. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  10. Streamlined approach for environmental restoration (SAFER) plan for corrective action unit 412: clean slate I plutonium dispersion (TTR) tonopah test range, Nevada, revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K.

    2015-04-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 412. CAU 412 is located on the Tonopah Test Range and consists of a single corrective action site (CAS), TA-23-01CS, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1997 interim corrective action to recommend closure of CAU 412 using the SAFER process. Based on existing data, the presumed corrective action for CAU 412 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information and determine whether the CAU 412 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU.The following summarizes the SAFER activities that will support the closure of CAU 412:• Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information.• If no COCs are present, establish clean closure as the corrective action. • If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF).• Confirm the preferred closure option is sufficient to protect human health and the environment.

  11. Savannah River Site mixed waste Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and reference document: Revision 2

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1995-01-01

    The DOE is required by the Resource Conservation and Recovery Act to prepare site treatment plans describing the development of treatment capacities and technologies for treating mixed waste. This proposed plan contains Savannah River Site's preferred options and schedules for constructing new facilities, and otherwise obtaining treatment for mixed wastes. The proposed plan consists of 2 volumes. Volume 1, Compliance Plan, identifies the capacity to be developed and the schedules as required. Volume 2, Background, provides a detailed discussion of the preferred options with technical basis, plus a description of the specific waste streams. Chapters are: Introduction; Methodology; Mixed low level waste streams; Mixed transuranic waste; High level waste; Future generation of mixed waste streams; Storage; Process for evaluation of disposal issues in support of the site treatment plans discussions; Treatment facilities and treatment technologies; Offsite waste streams for which SRS treatment is the Preferred Option (Naval reactor wastes); Summary information; and Acronyms and glossary. This revision does not contain the complete revised report, but only those pages that have been revised

  12. Closure Report for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems, Nevada Test Site, Nevada with Errata Sheet, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Mark Krauss

    2004-08-01

    The purpose of this CR is to document that closure activities have met the approved closure standards detailed in the NDEP-approved CAP for CAU 271. The purpose of the Errata Sheet is as follows: In Appendix G, Use Restriction (UR) Documentation, the UR form and drawing of the UR area do not reflect the correct coordinates. Since the original UR was put into place, the UR Form has been updated to include additional information that was not on the original form. This Errata Sheet replaces the original UR Form and drawing. In place of the drawing of the UR area, an aerial photograph is included which reflects the UR area and the correct coordinates for the UR area.

  13. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 411. Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick K. [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-03-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions

  14. Addendum to the post-closure permit application for the Bear Creek hydrogeologic regime at the Y-12 plant: Walk-in pits

    International Nuclear Information System (INIS)

    1995-04-01

    In June 1987, the Resource Conservation and Recovery Act (RCRA) Closure/Post-Closure Plan for the Bear Creek Burial Grounds (BCBG) located at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval.The Closure Plan has been modified and revised several times. This document is an addendum to the Post-Closure Permit Application submitted to TDEC in June, 1994. This addendum contains information on the Walk-In Pits of the BCBG which is meant to supplement the information provided in the Post-Closure Permit Application submitted for the BCBG. This document is not intended to be a stand-alone document.

  15. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-11-01

    The Bear Creek Burial Grounds (BCBG) are located on the southwest flank of Pine Ridge ∼1.5 miles west of the Oak Ridge Y-12 Plant in Bear Creek Valley. This facility consists of several contiguous disposal sites identified as Burial Grounds A, B, C, and D. Each burial site consists of a series of trenches used for disposal of solid wastes and, in some cases, liquid wastes. Initially, the RCRA Closure/Postclosure plan for the BCBG was intended to apply to A Area, C-West, B Area, and the walk-in pits for BCBG. However, a plan was provided to include the B Area in the walk-in pits so that both areas cold be closed under one cap. The closure plan for B Area and the walk-in pits is presented in this document. The actual quantity and identity of materials is uncertain. The largest volume of material disposed in BCBG consists of uranium-contaminated industrial trash (paper, wood, steel, glass, and rubble)

  16. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    Energy Technology Data Exchange (ETDEWEB)

    Finley, Robert [Univ. of Illinois, Champaign, IL (United States); Payne, William [Schlumberger Carbon Services, Houston, TX (United States); Kirksey, Jim [Univ. of Illinois, Champaign, IL (United States)

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  17. Closure requirements

    International Nuclear Information System (INIS)

    Hutchinson, I.P.G.; Ellison, R.D.

    1992-01-01

    Closure of a waste management unit can be either permanent or temporary. Permanent closure may be due to: economic factors which make it uneconomical to mine the remaining minerals; depletion of mineral resources; physical site constraints that preclude further mining and beneficiation; environmental, regulatory or other requirements that make it uneconomical to continue to develop the resources. Temporary closure can occur for a period of several months to several years, and may be caused by factors such as: periods of high rainfall or snowfall which prevent mining and waste disposal; economic circumstances which temporarily make it uneconomical to mine the target mineral; labor problems requiring a cessation of operations for a period of time; construction activities that are required to upgrade project components such as the process facilities and waste management units; and mine or process plant failures that require extensive repairs. Permanent closure of a mine waste management unit involves the provision of durable surface containment features to protect the waters of the State in the long-term. Temporary closure may involve activities that range from ongoing maintenance of the existing facilities to the installation of several permanent closure features in order to reduce ongoing maintenance. This paper deals with the permanent closure features

  18. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Decontamination Pond Facility. Revision 1

    International Nuclear Information System (INIS)

    1996-08-01

    This plan presents the strategy for the characterization of the Area 6 Decontamination Pond Facility at the Nevada Test Site which will be conducted for the US Department of Energy, Nevada Operations Office, Environmental Restoration Division. The objectives of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste. The scope of the characterization may include surface radiation survey(s), surface soil sampling, subsurface soil boring (i.e., drilling), and sampling of soil in and around the pond; in situ sampling of the soil within subsurface soil borings; and sample analysis for both site characterization and waste management purposes

  19. 78 FR 48504 - Proposed Revisions to Maintenance Rule Standard Review Plan

    Science.gov (United States)

    2013-08-08

    ... (ML13015A125), Current Revision 1 (ML072920088), Redline (ML13015A426). NRC's PDR: You may examine and purchase.... The NRC staff has no intention to impose the SRP positions on existing licensees either now or in the...

  20. California; Northern Sierra Air Quality Management District; Approval of Air Plan Revisions; Wood Burning Devices

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Northern Sierra Air Quality Management District (NSAQMD) portion of the California SIP concerning emissions of particulate matter (PM) from wood burning devices.