WorldWideScience

Sample records for capital cost estimate

  1. Cost of Capital Estimation for Highway Concessionaires in Chile

    Directory of Open Access Journals (Sweden)

    Cristian Vergara-Novoa

    2018-01-01

    Full Text Available In this paper, we present the cost of capital estimation for highway concessionaires in Chile. We estimated the cost of equity and the cost of debt and determined the capital structure for each one of twenty-four concessionaires that operate highways. We based our estimations on the developments of Sharpe (1964, Modigliani and Miller (1958, and Maquieira (2009, which were also compared with the Brusov et al. (2015 developments. We collected stock prices for different highway concessionaires around the world from Google Finance and Reuters’ websites in order to determine the Beta of equity using a representative company. After that, we estimated the cost of equity considering Hamada (1969 and a Capital Asset Pricing Model. Then, we estimated the cost of capital using the cost of debt and the capital structure of Chile’s highway concessionaires. With all above, we were able to determine the Weighted Average Cost of Capital (WACC for highway concessions which ranges from 5.49 to 6.62%.

  2. Social opportunity cost of capital: empirical estimates

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, S.

    1978-02-01

    This report develops estimates of the social-opportunity cost of public capital. The private and social costs of capital are found to diverge primarily because of the effects of corporate and personal income taxes. Following Harberger, the social-opportunity cost of capital is approximated by a weighted average of the returns to different classes of savers and investors where the weights are the flows of savings or investments in each class multiplied by the relevant elasticity. Estimates of these parameters are obtained and the social-opportunity cost of capital is determined to be in the range of 6.2 to 10.8%, depending upon the parameter values used. Uncertainty is found to affect the social-opportunity cost of capital in two ways. First, some allowance must be made for the chance of failure or at least of not realizing claims of a project's proponents. Second, a particular government project will change the expected variability of the returns to the government's entire portfolio of projects. In the absence of specific information about each project, the use of the economy-wide average default and risk adjustments is suggested. These are included in the empirical estimates reported. International capital markets make available private capital, the price of which is not distorted by the U.S. tax system. The inclusion of foreign sources slightly reduces the social-opportunity cost of capital. 21 references.

  3. Radium removal processes capital and operating cost estimates

    International Nuclear Information System (INIS)

    Kelly, F.J.

    1979-09-01

    An estimate of the fixed capital and operating costs for two alternative processes for the removal of dissolved Ra-226 from uranium mill effluent in Elliot Lake, Ontario is presented. Process 1 consists of barium-radium coprecipitation followed by coagulation, flocculation and sedimentation. Process 2 consists of barium-radium coprecipitation followed by gravity media filtration, sand filter backwashing and sedimentation. Cost estimates were prepared for 18 different plant configurations designed to treat 1000 and 4000 imperial gallons per minute (ig/m) of effluent, 24 hrs per day, 7 days per week and 365 days per year with several equipment options. The estimated fixed capital costs for plants equipped with gravity filters were less than those equipped with circular clarifiers. The capital costs ranged from $552,000 with a flow rate of 1000 ig/m to $2,578,000 with a flow rate of 4000 ig/m. Estimated annual operating costs, based on a plant life of 10 years, ranged from $298,000 with a flow rate of 1000 ig/m to $1,061,000 with a flow rate of 4000 ig/m

  4. Capital and operating cost estimates for high temperature superconducting magnetic energy storage

    International Nuclear Information System (INIS)

    Schoenung, S.M.; Meier, W.R.; Fagaly, R.L.; Heiberger, M.; Stephens, R.B.; Leuer, J.A.; Guzman, R.A.

    1992-01-01

    Capital and operating costs have been estimated for mid-scale (2 to 200 Mwh) superconducting magnetic energy storage (SMES) designed to use high temperature superconductors (HTS). Capital costs are dominated by the cost of superconducting materials. Operating costs, primarily for regeneration, are significantly reduced for HTS-SMES in comparison to low temperature, conventional systems. This cost component is small compared to other O and M and capital components, when levelized annual costs are projected. In this paper, the developments required for HTS-SMES feasibility are discussed

  5. Systematic methodology for estimating direct capital costs for blanket tritium processing systems

    International Nuclear Information System (INIS)

    Finn, P.A.

    1985-01-01

    This paper describes the methodology developed for estimating the relative capital costs of blanket processing systems. The capital costs of the nine blanket concepts selected in the Blanket Comparison and Selection Study are presented and compared

  6. Trends in nuclear power plant capital-investment cost estimates - 1976 to 1982

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1983-09-01

    This report describes trends in power plant capital investment cost estimates over the time period from 1976 to 1982. A review of economic parameters, inflation and escalation rates and cost of money, and a review of cost-size scaling relationships are included. Reference cost estimates are provided for light-water reactor and coal-fired electric power plants based on safety and environmental regulations in effect in January 1982. The sensitivity of the reference cost estimates to numerous economic parameters is analyzed

  7. Cost of capital to the hospital sector.

    Science.gov (United States)

    Sloan, F A; Valvona, J; Hassan, M; Morrisey, M A

    1988-03-01

    This paper provides estimates of the cost of equity and debt capital to for-profit and non-profit hospitals in the U.S. for the years 1972-83. The cost of equity is estimated using, alternatively, the Capital Asset Pricing Model and Arbitrage Pricing Theory. We find that the cost of equity capital, using either model, substantially exceeded anticipated inflation. The cost of debt capital was much lower. Accounting for the corporate tax shield on debt and capital paybacks by cost-based insurers lowered the net cost of capital to hospitals.

  8. Early‐Stage Capital Cost Estimation of Biorefinery Processes: A Comparative Study of Heuristic Techniques

    Science.gov (United States)

    Couturier, Jean‐Luc; Kokossis, Antonis; Dubois, Jean‐Luc

    2016-01-01

    Abstract Biorefineries offer a promising alternative to fossil‐based processing industries and have undergone rapid development in recent years. Limited financial resources and stringent company budgets necessitate quick capital estimation of pioneering biorefinery projects at the early stages of their conception to screen process alternatives, decide on project viability, and allocate resources to the most promising cases. Biorefineries are capital‐intensive projects that involve state‐of‐the‐art technologies for which there is no prior experience or sufficient historical data. This work reviews existing rapid cost estimation practices, which can be used by researchers with no previous cost estimating experience. It also comprises a comparative study of six cost methods on three well‐documented biorefinery processes to evaluate their accuracy and precision. The results illustrate discrepancies among the methods because their extrapolation on biorefinery data often violates inherent assumptions. This study recommends the most appropriate rapid cost methods and urges the development of an improved early‐stage capital cost estimation tool suitable for biorefinery processes. PMID:27484398

  9. Multicriteria Estimated Cost of Equity Capital Estimación multicriterio del costo de capital patrimonial

    Directory of Open Access Journals (Sweden)

    Juan Carlos Gutiérrez Betancur

    2009-12-01

    Full Text Available The estimation of the cost of equity capital is a key input to the capital budgeting  process when the firm uses internal financing. Financial analyst and managers usually utilize the CAPM to estimate the cost of equity which requires both measurement of  the market risk premium and estimation of beta. For publicly traded firms, calculating the cost of equity is entirely based on information from the financial markets. Non traded firms and small businesses do not have sufficient market based information. This article proposes a multicriteria model to determine the cost of equity for non traded firms. The Analytic Hierarchy Process developed by Thomas Saaty is the proposed methodology for deriving relative priorities of tangible and intangible corporate risk factors. The model requires business managers to identify the relevant information sources for the required input data. The inconsistencies checking mechanism within the AHP model allows management to identify inconsistencies, to revise prior judgments and to synthesize coherently.ResumenLa estimación del costo del capital propio es un elemento clave en el proceso de presupuestación de capital. Analistas y gerentes financieros utilizan el CAPM para estimar el costo del patrimonio, el cual requiere tanto la medición de la prima de riesgo del mercado como la estimación de beta. En el caso de compañías públicamente cotizadas y bursátiles, el cálculo del costo del patrimonio se basa totalmente en la información disponible en los mercados financieros. Las firmas no transadas en bolsa no cuentan con suficiente información de mercado que permita construir un comparable exactamente válido. Este artículo propone un modelo multicriterio para determinar el costo del capital propio de compañías no transadas en bolsa. El Proceso Analítico de Jerarquías desarrollado por Thomas Saaty soporta la metodología propuesta para derivar prioridades relativas de factores de riesgo corporativos

  10. Conceptual capital-cost estimate and facility design of the Mirror-Fusion Technology Demonstration Facility

    International Nuclear Information System (INIS)

    1982-09-01

    This report contains contributions by Bechtel Group, Inc. to Lawrence Livermore National Laboratory (LLNL) for the final report on the conceptual design of the Mirror Fusion Technology Demonstration Facility (TDF). Included in this report are the following contributions: (1) conceptual capital cost estimate, (2) structural design, and (3) plot plan and plant arrangement drawings. The conceptual capital cost estimate is prepared in a format suitable for inclusion as a section in the TDF final report. The structural design and drawings are prepared as partial inputs to the TDF final report section on facilities design, which is being prepared by the FEDC

  11. Capital-cost behavior: is nuclear different

    International Nuclear Information System (INIS)

    Lotze, C.D.; Riordan, B.J.

    1978-01-01

    The capital costs of coal-fired and nuclear power plants are found to be comparable when costs for pollution control are included. Trends in capital costs reveal a similar rate gain that retains the same economic balance. Graphs of selected cost indices are used to show that the rapid increase in direct construction costs is not unique to nuclear plants, those of hydroelectric plants as well as coal-fired having the same pattern. Comparisons of indirect capital costs, based on analyses of direct capital and total capital costs, show estimated average growth rates of total costs to be 14% for coal and 13.6% for nuclear, while direct cost growth rates are 10.2% and 10.4%. The economics of market competition can be expected to push alternative energy source projects into balance

  12. LIFE Cost of Electricity, Capital and Operating Costs

    International Nuclear Information System (INIS)

    Anklam, T.

    2011-01-01

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  13. Transit forecasting accuracy : ridership forecasts and capital cost estimates, final research report.

    Science.gov (United States)

    2009-01-01

    In 1992, Pickrell published a seminal piece examining the accuracy of ridership forecasts and capital cost estimates for fixed-guideway transit systems in the US. His research created heated discussions in the transit industry regarding the ability o...

  14. Cost of Capital and Bursa Malaysia Listed Company

    OpenAIRE

    Lim, Ru Po

    2005-01-01

    This study estimates the cost of capital of 226 securities listed in the Bursa Malaysia. The study's sample covers the period from January 1992 to August 2005. The cost of capital using Ordinary Least Squares Regression is first obtained. Next, the cost of capital using the 3 techniques which are the Scholes-Williams, the Dimson and Fowler-Rorke beta estimators for correction for nonsynchronous bias due to thin trading is applied. This study differs from the previous studies as this extends b...

  15. The Capital Costs Conundrum: Why Are Capital Costs Ignored and What Are the Consequences?

    Science.gov (United States)

    Winston, Gordon C.

    1993-01-01

    Colleges and universities historically have ignored the capital costs associated with institutional administration in their estimates of overall and per-student costs. This neglect leads to distortion of data, misunderstandings, and uninformed decision making. The real costs should be recognized in institutional accounting. (MSE)

  16. Capitals Cost and the Investments Actualisation Rate

    Directory of Open Access Journals (Sweden)

    Ion Stancu

    2006-02-01

    Full Text Available In this article, the author has assumed himself an assignment somehow ostentatious but useful, we believe, naming the one to illustrate by means of figures, the influence of both leverage and economic growth over the cost of capital, cost which will be used in capital budgeting. This synthesis is meant to be a forthcoming approach to a later investigation of the problems raised by the estimation of the cost of capital in the specific conditions of both the financial market in Romania and the quality of the economic-financial information, information available for this estimation. The discount rate for an investment project (kinv with a risk equal to the risk undertaken by the enterprise and financed within the firm’s capital structure itself (having the same leverage is equal to the (weighted average cost of capital in the respective risk class (k. Under these circumstances, it is interesting to find out this opportunity cost of capital invested in a medium-sized enterprise: a with investments in rebuilding the productive capacity, all equity financed; b with investments in rebuilding the productive capacity, financed both by equity and debt; c with new investments, all equity financed; d with new investments, financed both by equity and debt. Under these conditions, we estimate the effect of both the leverage and economic growth over the cost of capital (kec and kc to be able to determine in the end the discount rate of the analyzed investment (kinv: for enterprises with only maintaining investments (g = 0, unlevered (U and levered (L; for enterprises with growing investments (g > 0, unlevered (U and levered (L.

  17. Capitals Cost and the Investments Actualisation Rate

    Directory of Open Access Journals (Sweden)

    Ion Stancu

    2006-04-01

    Full Text Available In this article, the author has assumed himself an assignment somehow ostentatious but useful, we believe, naming the one to illustrate by means of figures, the influence of both leverage and economic growth over the cost of capital, cost which will be used in capital budgeting. This synthesis is meant to be a forthcoming approach to a later investigation of the problems raised by the estimation of the cost of capital in the specific conditions of both the financial market in Romania and the quality of the economic-financial information, information available for this estimation. The discount rate for an investment project (kinv with a risk equal to the risk undertaken by the enterprise and financed within the firm’s capital structure itself (having the same leverage is equal to the (weighted average cost of capital in the respective risk class (k. Under these circumstances, it is interesting to find out this opportunity cost of capital invested in a medium-sized enterprise: a with investments in rebuilding the productive capacity, all equity financed; b with investments in rebuilding the productive capacity, financed both by equity and debt; c with new investments, all equity financed; d with new investments, financed both by equity and debt. Under these conditions, we estimate the effect of both the leverage and economic growth over the cost of capital (kec and kc to be able to determine in the end the discount rate of the analyzed investment (kinv: for enterprises with only maintaining investments (g = 0, unlevered (U and levered (L; for enterprises with growing investments (g > 0, unlevered (U and levered (L.

  18. Laser cost experience and estimation

    International Nuclear Information System (INIS)

    Shofner, F.M.; Hoglund, R.L.

    1977-01-01

    This report addresses the question of estimating the capital and operating costs for LIS (Laser Isotope Separation) lasers, which have performance requirements well beyond the state of mature art. This question is seen with different perspectives by political leaders, ERDA administrators, scientists, and engineers concerned with reducing LIS to economically successful commercial practice, on a timely basis. Accordingly, this report attempts to provide ''ballpark'' estimators for capital and operating costs and useful design and operating information for lasers based on mature technology, and their LIS analogs. It is written very basically and is intended to respond about equally to the perspectives of administrators, scientists, and engineers. Its major contributions are establishing the current, mature, industrialized laser track record (including capital and operating cost estimators, reliability, types of application, etc.) and, especially, evolution of generalized estimating procedures for capital and operating cost estimators for new laser design

  19. Deflationary Expectations and Real Cost of Capital -Micro-Level Estimates of Investment Function in the1990s (in Japanese)

    OpenAIRE

    Satoshi Shimizutani; Terai Akira

    2003-01-01

    The Japanese economy in the 1990s experienced a substantial decrease in the nominal interest rate. The positive effect on the business investment, however, should have been canceled out, since deflationary expectations raised the real cost of capital. In this study, we address this unexplored issue by taking advantage of firm-level micro data. First, we calculate firm-level real cost of capital in the 1990s. Our estimates demonstrate that the speed of reduction in the real cost of capital was...

  20. An analysis of the estimated capital cost of a fusion reactor

    International Nuclear Information System (INIS)

    Hollis, A.A.

    1981-06-01

    The cost of building a fusion reactor similar to the Culham Conceptual Tokamak reactor Mark IIB is assessed and compared with other published capital costs of fusion and fission reactors. It is concluded that capital-investment and structure-renewal costs for a typical fusion reactor as presently conceived are likely to be higher than for thermal-fission reactors. (author)

  1. An analysis of the estimated capital cost of a fusion reactor

    International Nuclear Information System (INIS)

    Hollis, A.A.; Evans, L.S.

    1981-01-01

    The cost of building a fusion reactor similar to the Culham Conceptual Tokamak reactor Mark IIB is assessed and compared with other published capital costs of fusion and fission reactors. It is concluded that capital-investment and structure-renewal costs for a typical fusion reactor as presently conceived are likely to be higher than for thermal-fission reactors. (author)

  2. Cost of Capital in Price-regulated Companies: the Case of Estonia

    Directory of Open Access Journals (Sweden)

    Priit Sander

    2013-01-01

    Full Text Available In case of price-regulated companies it is the role of appropriate government agencies to introduce clear, internally consistent, theoretically sound, and unambiguous methodology for finding the regulative cost of capital. The aim of the paper is to describe and analyze the cost of capital estimation methodology for regulated companies in Estonia and discuss some issues arising in applying this methodology. The current paper focuses on two topical issues associated with the estimation of regulative cost of capital in Estonia: estimation of market risk premium and inclusion of currency risk premium into the cost of capital. Current turmoil in financial markets has increased investors’ risk aversion as well as level of risks.

  3. Uncertainties in early-stage capital cost estimation of process design – a case study on biorefinery design

    DEFF Research Database (Denmark)

    Cheali, Peam; Gernaey, Krist; Sin, Gürkan

    2015-01-01

    Capital investment, next to the product demand, sales, and production costs, is one of the key metrics commonly used for project evaluation and feasibility assessment. Estimating the investment costs of a new product/process alternative during early-stage design is a challenging task, which......) the Monte Carlo technique as an error propagation method based on expert input when cost data are not available. Four well-known models for early-stage cost estimation are reviewed and analyzed using the methodology. The significance of uncertainties of cost data for early-stage process design...

  4. Computer programs for capital cost estimation, lifetime economic performance simulation, and computation of cost indexes for laser fusion and other advanced technology facilities

    International Nuclear Information System (INIS)

    Pendergrass, J.H.

    1978-01-01

    Three FORTRAN programs, CAPITAL, VENTURE, and INDEXER, have been developed to automate computations used in assessing the economic viability of proposed or conceptual laser fusion and other advanced-technology facilities, as well as conventional projects. The types of calculations performed by these programs are, respectively, capital cost estimation, lifetime economic performance simulation, and computation of cost indexes. The codes permit these three topics to be addressed with considerable sophistication commensurate with user requirements and available data

  5. Capital cost: gas cooled fast reactor plant

    International Nuclear Information System (INIS)

    1977-09-01

    The results of an investment cost study for a 900 MW(e) GCFR central station power plant are presented. The capital cost estimate arrived at is based on 1976 prices and a conceptual design only, not a mature reactor design

  6. Some adjustments to the human capital and the friction cost methods.

    Science.gov (United States)

    Targoutzidis, Antonis

    2018-03-21

    The cost of lost output is a major component of the total cost of illness estimates, especially those for the cost of workplace accidents and diseases. The two main methods for estimating this output, namely the human capital and the friction cost method, lead to very different results, particularly for cases of long-term absence, which makes the choice of method a critical dilemma. Two hidden assumptions, one for each method, are identified in this paper: for human capital method, the assumption that had the accident not happened the individual would remain alive, healthy and employed until retirement, and for friction cost method, the assumption that any created vacancy is covered by an unemployed person. Relevant adjustments to compensate for their impact are proposed: (a) to depreciate the estimates of the human capital method for the risks of premature death, disability or unemployment and (b) to multiply the estimates of the friction cost method with the expected number of job shifts that will be caused by a disability. The impact of these adjustments on the final estimates is very important in terms of magnitude and can lead to better results for each method.

  7. Alternative measures of the Federal Reserve Banks' cost of equity capital

    OpenAIRE

    Barnes, Michelle L.; Lopez, Jose A.

    2005-01-01

    The Monetary Control Act of 1980 requires the Federal Reserve System to provide payment services to depository institutions through the twelve Federal Reserve Banks at prices that fully reflect the costs a private-sector provider would incur, including a cost of equity capital (COE). Although Fama and French (1997) conclude that COE estimates are “woefully” and “unavoidably” imprecise, the Reserve Banks require such an estimate every year. We examine several COE estimates based on the Capital...

  8. Food irradiation : estimates of cost of processing

    International Nuclear Information System (INIS)

    Krishnamurthy, K.; Bongirwar, D.R.

    1987-01-01

    For estimating the cost of food irradiation, three factors have to be taken into consideration. These are : (1) capital cost incurred on irradiation device and its installation, (2) recurring or running cost which includes maintenance cost and operational expenditure, and (3) product specific cost dependent on the factors specific to the food item to be processed, its storage, handling and distribution. A simple method is proposed to provide estimates of capital costs and running costs and it is applied to prepare a detailed estimate of costs for irradiation processing of onions and fish in India. The cost of processing onions worked out to be between Rs. 40 to 120 per 1000 Kg and for fish Rs 354 per 1000 Kg. These estimates do not take into account transparation costs and fluctuations in marketing procedures. (M.G.B.). 7 tables

  9. To the calculation of reduced cost capital component for power objects

    International Nuclear Information System (INIS)

    Andryushchenko, A.I.; Larin, E.A.

    1990-01-01

    The method for calculating capitalized cost component enabling comparison of alternative arrangement variants of power plant, is suggested. It is shown that in order to realize the technical-economical estimates in power industry for determination of capitalized cost component it is necessary to take into account capital construction expenditures as well as deductions for the plant dismountling and elimination of potential accidents

  10. Capital investment costs of nuclear power plants

    International Nuclear Information System (INIS)

    Woite, G.

    1978-01-01

    The purpose of the article is to summarize capital cost experience and estimates in industrialized and developing Member States of the IAEA, and to provide some guidance for cost extrapolation. The relative merits of different types and sizes of nuclear and conventional power plants for an expanding electricity generation system are compared over an adequate planning period

  11. Statistical methods of estimating mining costs

    Science.gov (United States)

    Long, K.R.

    2011-01-01

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.

  12. Capital adjustment cost and bias in income based dynamic panel models with fixed effects

    OpenAIRE

    Yoseph Yilma Getachew; Keshab Bhattarai; Parantap Basu

    2012-01-01

    The fixed effects (FE) estimator of "conditional convergence" in income based dynamic panel models could be biased downward when capital adjustment cost is present. Such a capital adjustment cost means a rising marginal cost of investment which could slow down the convergence. The standard FE regression fails to take into account of this capital adjustment cost and thus it could overestimate the rate of convergence. Using a Ramsey model with long-run adjustment cost of capital, we characteriz...

  13. Commerical electric power cost studies. Capital cost addendum multi-unit coal and nuclear stations

    International Nuclear Information System (INIS)

    1977-09-01

    This report is the culmination of a study performed to develop designs and associated capital cost estimates for multi-unit nuclear and coal commercial electric power stations, and to determine the distribution of these costs among the individual units. This report addresses six different types of 2400 MWe (nominal) multi-unit stations as follows: Two Unit PWR Station-1139 MWe Each, Two Unit BWR Station-1190 MWe Each, Two Unit High Sulfur Coal-Fired Station-1232 MWe Each, Two Unit Low Sulfur Coal-Fired Station-1243 MWe Each, Three Unit High Sulfur Coal-Fired Station-794 MWe Each, Three Unit Low Sulfur Coal-Fired Station-801 MWe Each. Recent capital cost studies performed for ERDA/NRC of single unit nuclear and coal stations are used as the basis for developing the designs and costs of the multi-unit stations. This report includes the major study groundrules, a summary of single and multi-unit stations total base cost estimates, details of cost estimates at the three digit account level and plot plan drawings for each multi-unit station identified

  14. Transmission line capital costs

    International Nuclear Information System (INIS)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy's Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs

  15. A joint estimation of price-cost margins and sunk capital. Theory and evidence from the European electricity industry

    International Nuclear Information System (INIS)

    Roeger, W.; Warzynski, F.

    2004-01-01

    In this paper, we propose a new methodology to jointly estimate market power and the importance of sunk capital extending the work of Hall (1988) and Roeger (1995). Wc then apply this new technique to the European electricity industry using firm level data for the period 1994-1999, and analyze the impact of the 1996 European directive to liberalize electricity markets. We find that the average price cost margin has declined from 0.29 in 1994 to 0.22 in 1999. Moreover, the magnitude of the decline is linked to firm size: the largest firms have experienced a larger percentage fall. The variable cost parameter has increased from 0.36 in 1994 to 0.56 in 1999. The main reason of the change is the switch of the relationship between real labor productivity and the share of variable capital. Our results therefore document a more competitive electricity market and a more flexible and more efficient use of capital. (au)

  16. Uncertainties in Early Stage Capital Cost Estimation of Process Design – A case study on biorefinery design

    Directory of Open Access Journals (Sweden)

    Gurkan eSin

    2015-02-01

    Full Text Available Capital investment, next to the product demand, sales and production costs, is one of the key metrics commonly used for project evaluation and feasibility assessment. Estimating the investment costs of a new product/process alternative during early stage design is a challenging task. This is especially important in biorefinery research, where available information and experiences with new technologies is limited. A systematic methodology for uncertainty analysis of cost data is proposed that employs (a Bootstrapping as a regression method when cost data is available and (b the Monte Carlo technique as an error propagation method based on expert input when cost data is not available. Four well-known models for early stage cost estimation are reviewed an analyzed using the methodology. The significance of uncertainties of cost data for early stage process design is highlighted using the synthesis and design of a biorefinery as a case study. The impact of uncertainties in cost estimation on the identification of optimal processing paths is found to be profound. To tackle this challenge, a comprehensive techno-economic risk analysis framework is presented to enable robust decision making under uncertainties. One of the results using an order-of-magnitude estimate shows that the production of diethyl ether and 1,3-butadiene are the most promising with economic risks of 0.24 MM$/a and 4.6 MM$/a due to uncertainties in cost estimations, respectively.

  17. Key Issues and Challenges in Estimating the Cost of Capital for Energy Network Utilities in Emerging Markets(Gelişmekte Olan Ülkelerde Enerji Şebeke Şirketleri İçin Sermaye Maliyetinin Tahminindeki Ana Konu ve Sorunlar

    Directory of Open Access Journals (Sweden)

    Mustafa GÖZEN

    2012-01-01

    Full Text Available Estimating the cost of capital in emerging markets presents greater difficulties because these markets have relatively illiquid capital markets and higher levels of sovereign risk, economic uncertainties, and political risks. Experience shows that in estimating cost of capital, energy regulators in emerging countries usually depend on the work and recommendations of their staff and/or outside consultancy services. Since the ultimate decision is made by regulators, they need to understand the challenges and key issues in estimating a fair and reasonable cost of capital for energy utilities. The article introduces and discusses the key issues and challenges that regulators have to deal with when estimating cost of capital. Unfortunately, there is no agreement among academics, regulators, bankers, and other practitioners on how to address the key issues and challenges in determining the cost of capital in emerging economies. This makes capital cost estimation even more difficult in emerging economies.

  18. User Cost of Debt-Financed Capital in Irish Manufacturing Industry: 1985 2011

    OpenAIRE

    KEARNEY, IDE; ZNUDERL, NUSA

    2013-01-01

    PUBLISHED This paper provides estimates of the cost of debt-financed capital to Irish manufacturing industry over the period 1985 to 2011. The estimates are provided for two types of capital assets, machinery and equipment and industrial buildings. They also incorporate policy interventions aimed at influencing investment behaviour of manufacturing firms in Ireland. The results show that large capital gains recorded during the Celtic Tiger period created a downward distortion in the user c...

  19. INSURANCE AND THE CORPORATE COST OF CAPITAL

    Directory of Open Access Journals (Sweden)

    Monika Wieczorek-Kosmala

    2012-04-01

    Full Text Available The purpose of the paper is to provide some support to the thesis that insurance may reduce the cost of capital in a company by influencing both the cost of capital components and the need for rising capital. The problem is here perceived from two perspectives – the classical concept related to the weighted average cost of capital (WACC and a novel concept related to the risk-based capital structure model with the total average cost of capital (TACC. The paper explains the idea of insurance as a retrospective (post-loss risk financing tool and the risk transfer mechanism upon it. As the risk financing tool insurance reduces the need for the balance-sheet capital in a company and thus the financial distress costs. Also, insurance may reduce the level of operating risk and thus influences the required returns of the capital providers. These observations allow emphasising the impact of insurance on the WACC. However, according to the novel concept of the risk-based capital structure, insurance (as a risk financing tool represents an off-balance sheet capital component. As a consequence, it extends the volume of total capital. The presented conceptual model, based on the TACC concept, indicates that large volume of insurance (the insurance sum and its relatively low cost (the insurance premium gives the possibility to the significant reduction of the cost of capital on average. The concluding remarks discuss some dilemmas over the utility of the TACC concept.

  20. Analysis of capital and operating costs associated with high level waste solidification processes

    International Nuclear Information System (INIS)

    Heckman, R.A.; Kniazewycz, B.G.

    1978-03-01

    An analysis was performed to evaluate the sensitivity of annual operating costs and capital costs of waste solidification processes to various parameters defined by the requirements of a proposed Federal waste repository. Five process methods and waste forms examined were: salt cake, spray calcine, fluidized bed calcine, borosilicate glass, and supercalcine multibarrier. Differential cost estimates of the annual operating and maintenance costs and the capital costs for the five HLW solidification alternates were developed

  1. Uncertainties in Early-Stage Capital Cost Estimation of Process Design – A Case Study on Biorefinery Design

    International Nuclear Information System (INIS)

    Cheali, Peam; Gernaey, Krist V.; Sin, Gürkan

    2015-01-01

    Capital investment, next to the product demand, sales, and production costs, is one of the key metrics commonly used for project evaluation and feasibility assessment. Estimating the investment costs of a new product/process alternative during early-stage design is a challenging task, which is especially relevant in biorefinery research where information about new technologies and experience with new technologies is limited. A systematic methodology for uncertainty analysis of cost data is proposed that employs: (a) bootstrapping as a regression method when cost data are available; and, (b) the Monte Carlo technique as an error propagation method based on expert input when cost data are not available. Four well-known models for early-stage cost estimation are reviewed and analyzed using the methodology. The significance of uncertainties of cost data for early-stage process design is highlighted using the synthesis and design of a biorefinery as a case study. The impact of uncertainties in cost estimation on the identification of optimal processing paths is indeed found to be profound. To tackle this challenge, a comprehensive techno-economic risk analysis framework is presented to enable robust decision-making under uncertainties. One of the results using order-of-magnitude estimates shows that the production of diethyl ether and 1,3-butadiene are the most promising with the lowest economic risks (among the alternatives considered) of 0.24 MM$/a and 4.6 MM$/a, respectively.

  2. Uncertainties in Early-Stage Capital Cost Estimation of Process Design – A Case Study on Biorefinery Design

    Energy Technology Data Exchange (ETDEWEB)

    Cheali, Peam; Gernaey, Krist V.; Sin, Gürkan, E-mail: gsi@kt.dtu.dk [Department of Chemical and Biochemical Engineering, Technical University of Denmark, Lyngby (Denmark)

    2015-02-06

    Capital investment, next to the product demand, sales, and production costs, is one of the key metrics commonly used for project evaluation and feasibility assessment. Estimating the investment costs of a new product/process alternative during early-stage design is a challenging task, which is especially relevant in biorefinery research where information about new technologies and experience with new technologies is limited. A systematic methodology for uncertainty analysis of cost data is proposed that employs: (a) bootstrapping as a regression method when cost data are available; and, (b) the Monte Carlo technique as an error propagation method based on expert input when cost data are not available. Four well-known models for early-stage cost estimation are reviewed and analyzed using the methodology. The significance of uncertainties of cost data for early-stage process design is highlighted using the synthesis and design of a biorefinery as a case study. The impact of uncertainties in cost estimation on the identification of optimal processing paths is indeed found to be profound. To tackle this challenge, a comprehensive techno-economic risk analysis framework is presented to enable robust decision-making under uncertainties. One of the results using order-of-magnitude estimates shows that the production of diethyl ether and 1,3-butadiene are the most promising with the lowest economic risks (among the alternatives considered) of 0.24 MM$/a and 4.6 MM$/a, respectively.

  3. The Opportunity Cost of Capital

    Directory of Open Access Journals (Sweden)

    Ayman Chit PhD

    2015-04-01

    Full Text Available The opportunity cost of the capital invested in pharmaceutical research and development (R&D to bring a new drug to market makes up as much as half the total cost. However, the literature on the cost of pharmaceutical R&D is mixed on how, exactly, one should calculate this “hidden” cost. Some authors attempt to adopt models from the field of finance, whereas other prominent authors dismiss this practice as biased, arguing that it artificially inflates the R&D cost to justify higher prices for pharmaceuticals. In this article, we examine the arguments made by both sides of the debate and then explain the cost of capital concept and describe in detail how this value is calculated. Given the significant contribution of the cost of capital to the overall cost of new drug R&D, a clear understanding of the concept is critical for policy makers, investors, and those involved directly in the R&D.

  4. The Opportunity Cost of Capital

    Science.gov (United States)

    Chit, Ayman; Chit, Ahmad; Papadimitropoulos, Manny; Krahn, Murray; Parker, Jayson; Grootendorst, Paul

    2015-01-01

    The opportunity cost of the capital invested in pharmaceutical research and development (R&D) to bring a new drug to market makes up as much as half the total cost. However, the literature on the cost of pharmaceutical R&D is mixed on how, exactly, one should calculate this “hidden” cost. Some authors attempt to adopt models from the field of finance, whereas other prominent authors dismiss this practice as biased, arguing that it artificially inflates the R&D cost to justify higher prices for pharmaceuticals. In this article, we examine the arguments made by both sides of the debate and then explain the cost of capital concept and describe in detail how this value is calculated. Given the significant contribution of the cost of capital to the overall cost of new drug R&D, a clear understanding of the concept is critical for policy makers, investors, and those involved directly in the R&D. PMID:25933615

  5. Nuclear generating station and heavy water plant cost estimates for strategy studies

    International Nuclear Information System (INIS)

    Archinoff, G.H.

    1979-07-01

    Nuclear generating station capital, operating and maintenance costs are basic input data for strategy analyses of alternate nuclear fuel cycles. This report presents estimates of these costs for natural uranium CANDU stations, CANDU stations operating on advanced fuel cycles, and liquid metal fast breeder reactors. Cost estimates for heavy water plants are also presented. The results show that station capital costs for advanced fuel cycles are not expected to be significantly greater than those for natural uranium stations. LMFBR capital costs are expected to be 25-30 percent greater than for CANDU's. (auth)

  6. Capital budgeting and cost reimbursement in investor-owned and not-for-profit hospitals.

    Science.gov (United States)

    Hubbard, C M

    1983-01-01

    Net present value estimates cannot be made in health care finance without the appropriate cost reimbursement adjustments. The results of new regulations could radically alter the effects of reimbursement on capital budgeting. Debates on the effects of cost reimbursement on decision making in hospitals will continue as long as reimbursement exists in a manner that affects operating cash flows or the cost of capital.

  7. 42 CFR 412.302 - Introduction to capital costs.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Introduction to capital costs. 412.302 Section 412... Inpatient Hospital Capital Costs General Provisions § 412.302 Introduction to capital costs. (a) New capital... revision of the debt instrument. (iii) If short-term financing was used to acquire old capital assets and...

  8. Cost estimate for electrostatically plugged cusp reactor

    International Nuclear Information System (INIS)

    Dolan, T.J.

    1977-01-01

    A preliminary design of an electrostatically plugged cusp reactor was presented in (UCRL-52142(1976)). The capital costs of the various components of this reactor are estimated and totaled for two different blanket configurations: one having an energy multiplication factor M = 1.2, and the other having M = 1.68. The unoptimized direct capital costs for these cases are found to be about 1400 and 950 $/kWe, respectively

  9. Quarterly Aggregate Capital Input and the Cost of Capital for the

    OpenAIRE

    Subhash C. Sharma; Yijian He

    1995-01-01

    It is the flow of capital services, instead of the capital stock, along with the flows of other inputs which is related to the flows of outputs in economic theory of cost and production. In applied research, quite often to capture the dynamic phenomena which occurs within a year, there is a need to use quarterly data which may not be captured by annual data. However, quarterly data on capital input and the cost of capital are not readily available. Thus, in this paper the quarterly real and n...

  10. Innovation in the pharmaceutical industry: New estimates of R&D costs.

    Science.gov (United States)

    DiMasi, Joseph A; Grabowski, Henry G; Hansen, Ronald W

    2016-05-01

    The research and development costs of 106 randomly selected new drugs were obtained from a survey of 10 pharmaceutical firms. These data were used to estimate the average pre-tax cost of new drug and biologics development. The costs of compounds abandoned during testing were linked to the costs of compounds that obtained marketing approval. The estimated average out-of-pocket cost per approved new compound is $1395 million (2013 dollars). Capitalizing out-of-pocket costs to the point of marketing approval at a real discount rate of 10.5% yields a total pre-approval cost estimate of $2558 million (2013 dollars). When compared to the results of the previous study in this series, total capitalized costs were shown to have increased at an annual rate of 8.5% above general price inflation. Adding an estimate of post-approval R&D costs increases the cost estimate to $2870 million (2013 dollars). Copyright © 2016 Elsevier B.V. All rights reserved.

  11. FACTORS AFFECTING THE ENTERPRISE’S COST OF CAPITAL IN UKRAINE

    Directory of Open Access Journals (Sweden)

    Tetiana KONIEVA,

    2017-02-01

    Full Text Available Reducing the cost of capital is one of the main tasks of financial management of any enterprise.Because of dynamism of market conditions, the economic situation in the country, the existingrequirements of the legislation, the volume, structure, cost of financial resources of the enterprise fallunder the influence of various factors. The goal of this article is to analyze the specific features of theinfluence of different factors on the weighted average cost of capital in Ukraine as a basis fordevelopment of methods for its reducing. Investigation of factors that influence on the company's financialresources was carried out in the directions determined by the classical formula of the weighted averagecost of capital (WACC, estimation of the cost of net assets’ attracting (CAPM model. Special attentionwas paid to the analysis of the domestic legislative base concerning the permitted forms of businessorganization in Ukraine, requirements for the emission and dividend policy of the enterprise, size of itsregistered, reserve capital, share of net assets in financial resources. Based on the statistical data ofdomestic business entities, their ownership structure, sources of financing, specific features of theeconomic sector’s influence were analyzed. As a result, the prevalence of corporate enterprises in Ukrainewas revealed, which is connected with relatively low costs and favorable conditions for establishment andregistration. As part of the analysis of the financial resources’ structure high level of dependence fromdebts, the popularity of commercial credit, negative effect of financial leverage were found at theUkrainian enterprises. The features of the economic sector of enterprise were analyzed, that determine thevolume of capital investments for creation and development, duration of the operational cycle,seasonality, operating and investment activities, the level of profitability, which affect the volume,structure, cost of the capital of

  12. Information and the Cost of Capital: An Ex Ante Perspective

    DEFF Research Database (Denmark)

    Christensen, Peter Ove; de la Rosa, Leonidas Enrique; Feltham, Gerald A.

    2010-01-01

    Recent articles have demonstrated that increased public disclosure can decrease firms' cost of capital. The focus has been on the impact of information on the cost of capital subsequent to the release of the information (the ex post cost of capital). We show that the reduction in the ex post cost...... investors may actually benefit from a higher ex post cost of capital....... of capital is offset by an equal increase in the cost of capital for the period leading up to the release of the information (the preposterior cost of capital). Thus, within the class of models framing the recent discussion, there is no impact on the ex ante cost of capital covering the full time span...

  13. Recent estimates of capital flight

    OpenAIRE

    Claessens, Stijn; Naude, David

    1993-01-01

    Researchers and policymakers have in recent years paid considerable attention to the phenomenon of capital flight. Researchers have focused on four questions: What concept should be used to measure capital flight? What figure for capital flight will emerge, using this measure? Can the occurrence and magnitude of capital flight be explained by certain (economic) variables? What policy changes can be useful to reverse capital flight? The authors focus strictly on presenting estimates of capital...

  14. The effect of non-financial risk information on the evaluation of implied cost of capitals

    OpenAIRE

    Norio Kitagawa; Hyonok Kim; Masatoshi Goto

    2011-01-01

    The purpose of this paper is to examine the effect of voluntary disclosure of `business risk' information (hereafter referred to as `risk information' ), which is a significant determinant of the information environment, on estimating the cost of capital. Recently, some studies indicate that the reliability of the cost of capital estimation differs according to the accounting standards and the information environment of the firm (e.g. Chen et al., 2004; Easton and Monahan, 2005). On the basis...

  15. What's your real cost of capital?

    Science.gov (United States)

    McNulty, James J; Yeh, Tony D; Schulze, William S; Lubatkin, Michael H

    2002-10-01

    In valuing any investment project or corporate acquisition, executives must decide what discount rate to use in their estimates of future cash flows. The traditional approach is to apply the capital asset pricing model (CAPM), which has remained fundamentally unchanged for 40 years. But the formula--in particular, its beta element--has long been a source of frustration. In fact, corporate executives and investment bankers routinely fudge their CAPM estimates, say the authors, because experience and intuition tell them the model produces inappropriate discount rates. CAPM has three main problems: First, beta is a measure of both a stock's correlation and its volatility; second, beta is based on historical data; and third, CAPM rates don't take into account the term of the investment. These factors together result in discount rates that defy common sense. As an alternative to CAPM and its beta element, the authors developed a forward-looking approach to calculating a company's cost of capital, the market-derived capital pricing model (MCPM). It does not incorporate any measure of historical stock-to-market correlation, relying instead on estimates of future volatility derived from the options market. This is helpful since investor expectations from the options market are built into a company's current stock price. Using GE as an example, the authors give step-by-step instructions for how to calculate discount rates with MCPM. They also offer evidence from a range of industries to show that MCPM's discount rates are more realistic--especially from the corporate investor's perspective--than are CAPM's.

  16. Power plant cost estimates put to the test

    International Nuclear Information System (INIS)

    Crowley, J.H.

    1978-01-01

    The growth in standards for nuclear applications and the impact of these codes and standards on the cost of nuclear power plants is described. The preparation of cost estimates and reasons for apparent discrepancies are discussed. Consistent estimates of nuclear power plant costs have been prepared in the USA for over a decade. They show that the difference in capital costs between nuclear and coal fired plants is narrowing and that when total generating costs are calculated nuclear power is substantially cheaper. (UK)

  17. Hospital financing: calculating inpatient capital costs in Germany with a comparative view on operating costs and the English costing scheme.

    Science.gov (United States)

    Vogl, Matthias

    2014-04-01

    The paper analyzes the German inpatient capital costing scheme by assessing its cost module calculation. The costing scheme represents the first separated national calculation of performance-oriented capital cost lump sums per DRG. The three steps in the costing scheme are reviewed and assessed: (1) accrual of capital costs; (2) cost-center and cost category accounting; (3) data processing for capital cost modules. The assessment of each step is based on its level of transparency and efficiency. A comparative view on operating costing and the English costing scheme is given. Advantages of the scheme are low participation hurdles, low calculation effort for G-DRG calculation participants, highly differentiated cost-center/cost category separation, and advanced patient-based resource allocation. The exclusion of relevant capital costs, nontransparent resource allocation, and unclear capital cost modules, limit the managerial relevance and transparency of the capital costing scheme. The scheme generates the technical premises for a change from dual financing by insurances (operating costs) and state (capital costs) to a single financing source. The new capital costing scheme will intensify the discussion on how to solve the current investment backlog in Germany and can assist regulators in other countries with the introduction of accurate capital costing. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  18. An Economical Approach to Estimate a Benchmark Capital Stock. An Optimal Consistency Method

    OpenAIRE

    Jose Miguel Albala-Bertrand

    2003-01-01

    There are alternative methods of estimating capital stock for a benchmark year. However, these methods are costly and time-consuming, requiring the gathering of much basic information as well as the use of some convenient assumptions and guesses. In addition, a way is needed of checking whether the estimated benchmark is at the correct level. This paper proposes an optimal consistency method (OCM), which enables a capital stock to be estimated for a benchmark year, and which can also be used ...

  19. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  20. Relationship between information asymmetry and cost of capital

    Directory of Open Access Journals (Sweden)

    Fateme Rahmani

    2013-01-01

    Full Text Available Shareholders expected return is normally impacted by informational risk and informational asymmetry, on the other hand, creates informational risk. Thus, investors demand greater risk premium in the case of informational asymmetry and in turn corporate expenditures increase. In this study, we determine the relationship between informational asymmetry and capital cost. The study uses information of 109 companies listed in Tehran Securities Exchange over the period of 2005-2010 and the results suggest a positive and significant relationship between informational asymmetry and capital cost. In addition, the results from present research indicate that when capital markets are competitive, there is not a significant relationship between informational asymmetry and capital cost. But when markets are partially competitive there is a significant relationship between informational asymmetry and capital cost.

  1. Estimation of costs for fabrication of pressurized-water reactor fuel

    International Nuclear Information System (INIS)

    Judkins, R.R.; Olsen, A.R.

    1979-01-01

    To provide a reference case on which to base cost estimates of the several fuel cycles to be considered, the facility, equipment, and operating requirements for the fabrication of fuel for current-design pressurized-water reactors were examined. From an analysis of these requirements, the capital and operating costs of a plant with a capacity of two metric tons of heavy metal per day (MTHM/day) were estimated. In a cash flow analysis, the lifetime of the plant was assumed to be 20 y, and the income from the sale of nuclear fuel assemblies over this period was equated to the total capital and operating expenses of the plant, including a specified 15% return on investment. In this way a levelized unit price for the fuel was obtained. The effects of inflation were not considered since the purpose of these estimates and the determination of unit price was to permit comparison of different types of fuels. The capital costs of the fuel fabrication plant were estimated at $32 million for the facility--land, site preparation, building--and $34 million for equipment. Annual operating costs including labor, management, materials, and utilities were estimated to be $36.5 million. From these estimates, the unit price for fabricating the fuel for the reference pressurized-water reactor was determined to be $138/kg of heavy metal or $63,600 per fuel assembly

  2. Impact of power purchases from non-utilities on the utility cost of capital

    International Nuclear Information System (INIS)

    Kahn, E.; Stoft, S.; Belden, T.

    1995-01-01

    The bond rating agencies in the USA have asserted that long-term power purchase contracts between non-utility generators and utilities are the equivalent of debt to the utilities, and therefore raise the cost of capital to the purchaser. Non-Utility generators claim that these contracts reduce risk to the utilities. This debate is reflected in the 1992 Energy Policy Act. This paper investigates this controversy from the perspective of the equity markets. Using a CAPM framework, various specifications of the cost of equity capital are estimated, to shed light on this question. No evidence is found for the hypothesis that non-utility generation contracts raise the cost of capital. There does appear to be a slight increase in this cost for those utilities seeking to build their own generation capacity as opposed to purchasing it from non-utility suppliers. (author)

  3. Reduction of capital costs of nuclear power plants

    International Nuclear Information System (INIS)

    2000-01-01

    The competitiveness of nuclear power plants depends largely on their capital costs represent some 60 per cent of their total generation costs. Reviewing and analysing ways and means to reduce capital costs of nuclear power plants are essential to enhance the economic viability of the nuclear option. The report is based upon cost information and data provided by experts from NEA Member countries. It investigates the efficiency of alternative methods for reducing capital costs of nuclear units. It will provide stakeholders from the industry and governmental agencies with relevant elements in support of policy making. (author)

  4. Can we replace CAPM and the Three-Factor model with Implied Cost of Capital?

    OpenAIRE

    Löthman, Robert; Pettersson, Eric

    2014-01-01

    Researchers criticize predominant expected return models for being imprecise and based on fundamentally flawed assumptions. This dissertation evaluates Implied Cost of Capital, CAPM and the Three-Factor model abilities to estimate returns. We study each models expected return association to realized return and test for abnormal returns. Our sample covers the period 2000 to 2012 and includes 2916 US firms. We find that Implied Cost of Capital has a stronger association with realized returns th...

  5. Mandatory IFRS adoption and the cost of Equity Capital. Evidence from Spanish Firms

    Directory of Open Access Journals (Sweden)

    David Castillo-Merino

    2014-05-01

    Full Text Available Purpose: The main objective of this paper analyses the effects of mandatory International Financial Reporting Standards (IFRS adoption by Spanish firms in 2005 on the cost of equity capital. Design/methodology: Using a sample of listed Spanish companies during the 1999 to 2009 period and a country-level focused analysis. To achieve our objective we relied on OLS regression analysis and estimate the dependent variable – the cost of equity – by using the proxy suggested in Easton (2004. Findings: We find evidence that, unlike previous studies, Spanish listed companies show a significant reduction in their cost of equity capital after the mandatory adoption of IFRS in 2005, after controlling by a set of firm-risk and market variables. According to our results, increased financial disclosure and enhanced information comparability, along with changes in legal and institutional enforcement, seem to have a joint effect on the cost of capital, leading to a large decrease in expected equity returns. Research limitations: The main limitation of the study is that the sample represents just one country. Practical implications: The findings of the study may have implications for the firms’ management staff, as they reveal what information determines the cost of equity capital. The systematic risk and the leverage affect positively the cost of stocks and therefore their market value. The results are consistent with the financial principle establishing that the higher risk and the higher leverage, the higher cost of capital. Originality/value: As a result of the conducted research, one is able to figure out which stock-return variables should be observed to anticipate the change of a company’s cost of capital.

  6. Capital Regulation, the Cost of Financial Intermediation and Bank Profitability: Evidence from Bangladesh

    Directory of Open Access Journals (Sweden)

    Changjun Zheng

    2017-04-01

    Full Text Available In response to the recent global financial crisis, the regulatory authorities in many countries have imposed stringent capital requirements in the form of the BASEL III Accord to ensure financial stability. On the other hand, bankers have criticized new regulation on the ground that it would enhance the cost of funds for bank borrowers and deteriorate the bank profitability. In this study, we examine the impact of capital requirements on the cost of financial intermediation and bank profitability using a panel dataset of 32 Bangladeshi banks over the period from 2000 to 2015. By employing a dynamic panel generalized method of moments (GMM estimator, we find robust evidence that higher bank regulatory capital ratios reduce the cost of financial intermediation and increase bank profitability. The results hold when we use equity to total assets ratio as an alternative measure of bank capital. We also observe that switching from BASEL I to BASEL II has no measurable impact on the cost of financial intermediation and bank profitability in Bangladesh. In the empirical analysis, we further observe that higher bank management and cost efficiencies are associated with the lower cost of financial intermediation and higher bank profitability. These results have important implications for bank regulators, academicians, and bankers.

  7. The role of capital costs in decarbonizing the electricity sector

    Science.gov (United States)

    Hirth, Lion; Steckel, Jan Christoph

    2016-11-01

    Low-carbon electricity generation, i.e. renewable energy, nuclear power and carbon capture and storage, is more capital intensive than electricity generation through carbon emitting fossil fuel power stations. High capital costs, expressed as high weighted average cost of capital (WACC), thus tend to encourage the use of fossil fuels. To achieve the same degree of decarbonization, countries with high capital costs therefore need to impose a higher price on carbon emissions than countries with low capital costs. This is particularly relevant for developing and emerging economies, where capital costs tend to be higher than in rich countries. In this paper we quantitatively evaluate how high capital costs impact the transformation of the energy system under climate policy, applying a numerical techno-economic model of the power system. We find that high capital costs can significantly reduce the effectiveness of carbon prices: if carbon emissions are priced at USD 50 per ton and the WACC is 3%, the cost-optimal electricity mix comprises 40% renewable energy. At the same carbon price and a WACC of 15%, the cost-optimal mix comprises almost no renewable energy. At 15% WACC, there is no significant emission mitigation with carbon pricing up to USD 50 per ton, but at 3% WACC and the same carbon price, emissions are reduced by almost half. These results have implications for climate policy; carbon pricing might need to be combined with policies to reduce capital costs of low-carbon options in order to decarbonize power systems.

  8. 48 CFR 52.215-16 - Facilities Capital Cost of Money.

    Science.gov (United States)

    2010-10-01

    ... Money. 52.215-16 Section 52.215-16 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....215-16 Facilities Capital Cost of Money. As prescribed in 15.408(h), insert the following provision: Facilities Capital Cost of Money (JUN 2003) (a) Facilities capital cost of money will be an allowable cost...

  9. Human capital demand in Brazil: The effects of adjustment cost, economic growth, exports and imports

    Directory of Open Access Journals (Sweden)

    Joilson Dias

    2015-01-01

    Full Text Available The objective of this paper is to learn about the effects of the adjustment costs, economic growth, imports and exports on human capital labor demand. The dynamic model proposed by Sargent (1978 was adjusted to consider three types of human capital: (a one with fundamental education (1–8 years of schooling; (b one with secondary education level (9–11 years of education; (c and one with tertiary education level (12 years or more of schooling. Using state level panel data, the dynamic econometrics estimates showed the following results: (i the labor market adjustment costs are very higher; (ii the adjustment cost for the human capital with intermediary education level is the highest one compared to the others; (iii the states’ economic growth favor those with superior education; (iv the imports seems to favor the demand for those with intermediate education levels; (v the degree of openness does show some weak effect on the demand for human capitals with intermediate education. In sum, the growing demand for human capital with some superior education seems to be more associated to its lower adjustment cost and economic growth; the non-significance of real wage elasticity and high adjustment cost seems to indicate that the human capital with intermediate knowledge is in short supply; hence, economic education policy that increases supply of such human capital are in need.

  10. Client capital as a source of enterprise cost

    Directory of Open Access Journals (Sweden)

    Verba Veronika A.

    2014-01-01

    Full Text Available The article presents the authors’ vision of the essence of the client capital and its influence upon the enterprise cost. The goal of the article is explanation of the role of the client capital in the process of enterprise capitalisation with the help of the business cost capitalisation model: investments into assets – cash flow generation – enterprise capitalisation. The result of the study is the authors’ position regarding the essence and structuring the client capital, which gives a possibility to detect financial and managerial instruments of capitalisation of the client capital. The conducted analysis of dynamics of financial parameters of the world leaders of IT industry, car building, clothes manufacture and beverages production allows detection of interconnection of the enterprise cost with the volume of assets and profit and identification of influence of the client capital upon capitalisation of enterprises of various spheres of activity. The article develops a model of capitalisation of the client capital on the basis of detection of cash flows, caused by formation of enterprises of B2C and B2B types.

  11. Use of Hedonic Prices to Estimate Capitalization Rate

    OpenAIRE

    Gaetano Lisi

    2015-01-01

    In this paper, a model of income capitalization is developed where hedonic prices play a key role in estimating the going-in capitalization rate. Precisely, the hedonic functions for rental and selling prices are introduced into a basic model of income capitalization. From the modified model, it is possible to derive a direct relationship between hedonic prices and capitalization rate. An advantage of the proposed approach is that estimation of the capitalization rate can be made without cons...

  12. Capital Cost Optimization for Prefabrication: A Factor Analysis Evaluation Model

    Directory of Open Access Journals (Sweden)

    Hong Xue

    2018-01-01

    Full Text Available High capital cost is a significant hindrance to the promotion of prefabrication. In order to optimize cost management and reduce capital cost, this study aims to explore the latent factors and factor analysis evaluation model. Semi-structured interviews were conducted to explore potential variables and then questionnaire survey was employed to collect professionals’ views on their effects. After data collection, exploratory factor analysis was adopted to explore the latent factors. Seven latent factors were identified, including “Management Index”, “Construction Dissipation Index”, “Productivity Index”, “Design Efficiency Index”, “Transport Dissipation Index”, “Material increment Index” and “Depreciation amortization Index”. With these latent factors, a factor analysis evaluation model (FAEM, divided into factor analysis model (FAM and comprehensive evaluation model (CEM, was established. The FAM was used to explore the effect of observed variables on the high capital cost of prefabrication, while the CEM was used to evaluate comprehensive cost management level on prefabrication projects. Case studies were conducted to verify the models. The results revealed that collaborative management had a positive effect on capital cost of prefabrication. Material increment costs and labor costs had significant impacts on production cost. This study demonstrated the potential of on-site management and standardization design to reduce capital cost. Hence, collaborative management is necessary for cost management of prefabrication. Innovation and detailed design were needed to improve cost performance. The new form of precast component factories can be explored to reduce transportation cost. Meanwhile, targeted strategies can be adopted for different prefabrication projects. The findings optimized the capital cost and improved the cost performance through providing an evaluation and optimization model, which helps managers to

  13. Capital Costs: A Conceptual Framework for Colleges and Universities

    Science.gov (United States)

    Cash, Samuel G.

    2004-01-01

    The increased attention to costs in recent years at colleges and universities draws attention to the matter of whether all costs are reflected and accounted for in the institution's internal and external financial reports. One category--capital costs--is thought by some to be overlooked at times. The possible neglect of capital costs in…

  14. Business capital accumulation and the user cost: is there a heterogeneity bias?

    OpenAIRE

    FATICA SERENA

    2016-01-01

    Using data from 23 market economy sectors across 10 OECD countries over the period 1984-2007 we show that the homogeneity assumption underlying empirical models for aggregate capital accumulation may lead to misspecification. Thus, we adopt a fully disaggregated approach – by asset types and sectors – to estimate the responsiveness of investment to the tax-adjusted user cost of capital. In this framework, we are able to link unobserved common factors to the nature of the shocks affecting the ...

  15. Client capital as a source of enterprise cost

    OpenAIRE

    Verba Veronika A.; Tyshchenko Oleksandr O.

    2014-01-01

    The article presents the authors’ vision of the essence of the client capital and its influence upon the enterprise cost. The goal of the article is explanation of the role of the client capital in the process of enterprise capitalisation with the help of the business cost capitalisation model: investments into assets – cash flow generation – enterprise capitalisation. The result of the study is the authors’ position regarding the essence and structuring the client capital, which gives a poss...

  16. Cost estimating Brayton and Stirling engines

    Science.gov (United States)

    Fortgang, H. R.

    1980-01-01

    Brayton and Stirling engines were analyzed for cost and selling price for production quantities ranging from 1000 to 400,000 units per year. Parts and components were subjected to indepth scrutiny to determine optimum manufacturing processes coupled with make or buy decisions on materials and small parts. Tooling and capital equipment costs were estimated for each detail and/or assembly. For low annual production volumes, the Brayton engine appears to have a lower cost and selling price than the Stirling Engine. As annual production quantities increase, the Stirling becomes a lower cost engine than the Brayton. Both engines could benefit cost wise if changes were made in materials, design and manufacturing process as annual production quantities increase.

  17. Carbon Emission Disclosure and the Cost of Capital: An Analysis of Malaysian Capital Market

    Directory of Open Access Journals (Sweden)

    Binti Abd Rahman Noor Raida

    2017-01-01

    Full Text Available The main purpose of this study is to examine the relationship between voluntary disclosure and cost of capital by exploring the impact of voluntary carbon emission disclosure (VCED on the firm’s weighted-average cost of capital. A carbon disclosure index is used to evaluate the quality of carbon emission disclosure in 2013 and 2014 annual reports of 247 Malaysian public listed companies. By using content analysis, the result highlights a significant increase in the level and quality of carbon emission disclosure practice from 2013 to 2014. In addition, the finding from regression analysis indicates insignificant relationship between VCED quality and weighted-average cost of capital. Overall, our findings suggest that the carbon emission disclosure is still low, as such, the quality of VCED do not have an impact on firm’s cost of capital. The results of the study allow the government to measure progress toward achieving its target to reduce carbon emission and will add weight to the call by accounting regulation body such as Malaysian Accounting Standard Board for a specific standard on carbon reporting.

  18. The Dependence of the Cost of Capital on Degree of Diversification

    Directory of Open Access Journals (Sweden)

    Zoran Popovic

    2018-03-01

    Full Text Available The subject of this paper are theoretical and methodological aspects of determining the cost of capital on the example of two companies from the Energoprojekt system. The goal is to point out the most significant problems of determining the cost of capital in general, as well as to identify the most significant determinants of those costs. In addition, the paper has a goal to point out to the degree of impact of diversification of those two companies on the cost of their capital. Using the CAPM, the total cost of capital is calculated for Energoprojekt Holding and Energoprojekt Industrija. In accordance with that, the following hypotheses are formulated: (H0 The value of the beta coefficient of both enterprises is equal to zero, (H1 Volatility of the yield of shares of both companies is higher than the entire market, (H2 The total cost of the Holding's capital is lower than the total cost of the capital of Industrija and (H3 The largest component of the equity cost in both companies is the country risk premium. The first, second and third research hypotheses are confirmed in the paper, while the null hypothesis is rejected. The total cost of capital for Holding is equal to 14,80% and the total cost of capital for Industrija is 17,10%. The main component of the cost of equity is the risk premium of investing in Serbia, which is exceptionally high and is equal to 6,40%.

  19. A study on effects of cost-of-equity models on cost-of-capital and capital structure

    Directory of Open Access Journals (Sweden)

    Meysam Arabzadeh

    2012-10-01

    Full Text Available Most financial managers believe that there are different factors hindering decision-making about the capital structure of a company. This hindrance is so that, in some financial management literatures capital structure is called the mystery of capital. Financial managers widely believe that financial leverage enjoys a noticeable status in managerial decision making as well as management of the framework of balance sheet. The primary purpose of this research is to present applications of equity modules and to study effective factors on such models on Tehran stock exchange. The study covers data over a period of five years from 2001 to 2005. The study analyzes and tests relevant data to firm’s debt ratio and corporate size as effective factors on cost-of-equity. The preliminary findings indicate that contrary to the commonly held belief in financial management theorems, debts ratio has the least effect on cost-of-equity. Nevertheless, the study suggests that the variant of company’s size has a meaningful relationship with cost-of-equity. To calculate cost-of-equity, CAPM, Gordon and return ratio methods are used. Findings show that CAPM has more validity compared with other varieties. On the other hand, the results indicate that there is a 95-percent probability proving that liquidity has a significant negative effect on financial leverage.

  20. Estimating the Value of Oil Capital in a Small Open Economy: the Venezuela's Example

    OpenAIRE

    Aniyar, Sara

    2003-01-01

    The paper focuses in the calculation of the oil capital value in a small open economy depending on oil rents. The Venezuelan case is used as an example. In valuing the oil capital, two issues are recalled and discussed: how should the exploration costs and the capital gains be treated? It is shown that the estimations vary significantly depending on which set of assumptions are made about the way to account for them and the assumptions made about how the economy functions. It is argued that d...

  1. Analysis of reactor capital costs and correlated sampling of economic input variables - 15342

    International Nuclear Information System (INIS)

    Ganda, F.; Kim, T.K.; Taiwo, T.A.; Wigeland, R.

    2015-01-01

    In this paper we present work aimed at enhancing the capability to perform nuclear fuel cycle cost estimates and evaluation of financial risk. Reactor capital costs are of particular relevance, since they typically comprise about 60% to 70% of the calculated Levelized Cost of Electricity at Equilibrium (LCAE). The work starts with the collection of historical construction cost and construction duration of nuclear plants in the U.S. and France, as well as forecasted costs of nuclear plants currently under construction in the U.S. This data has the primary goal of supporting the introduction of an appropriate framework, supported in this paper by two case studies with historical data, which allows the development of solid and defensible assumptions on nuclear reactor capital costs. Work is also presented on the enhancement of the capability to model interdependence of cost estimates between facilities and uncertainties. The correlated sampling capabilities in the nuclear economic code NECOST have been expanded to include partial correlations between input variables, according to a given correlation matrix. Accounting for partial correlations correctly allows a narrowing, where appropriate, of the probability density function of the difference in the LCAE between alternative, but correlated, fuel cycles. It also allows the correct calculation of the standard deviation of the LCAE of multistage systems, which appears smaller than the correct value if correlated input costs are treated as uncorrelated. (authors)

  2. A capital cost reduction study on the fast breeder reactor plant

    International Nuclear Information System (INIS)

    Taniyama, H.; Kamei, M.; Moriyama, M.

    1991-01-01

    A capital cost reduction study has been performed for large fast breeder reactor designs. The primary objective of this study is to show a trend of capital cost reduction between FBR plants at the prototype stage, the demonstration stage, and the future commercialization stage. For the FBR plant at the demonstration stage a construction cost comparison with a light water reactor has also been performed, and the target cost of FBR of below 1.5 times that of the light water reactor cost was achieved. To extend the capital cost reduction study, a feasibility study was made to achieve a capital cost of an FBR less than that of a light water reactor. The recommended design is shown as a future commercialization FBR design concept. (author)

  3. Capital costs of light water reactors: the USA

    International Nuclear Information System (INIS)

    MacKerron, G.

    1979-10-01

    The cost of building a modern nuclear power plant is greater than that of almost any other single civilian project - costs of individual plants are reckoned in hundreds of millions of pounds in the UK, and up to a billion dollars or more in the USA. Hence, depending on the size of nuclear programmes and their funding, escalation of nuclear capital costs may have important economic and social consequences through its effects on overall resource allocation. It is therefore important to analyse the extent and, as far as possible, the sources of cost increases and escalation, in order to see if the experience yields implications for technology policy. The USA has much the greatest experience in nuclear construction: it also has by far the largest amount of published information on the subject of capital costs. As all other countries lack either sufficient experience and/or adequate published cost information, it is impossible to conduct a genuine international comparison, and this paper is confined to an examination of US experience. This paper therefore assembles and evaluates currently available data on light water reactor (PWR and BWR) capital costs in the USA. (author)

  4. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M.E.; Prasad, C.; Toothman, D.A.; Kaplan, N.

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  5. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M E; Prasad, C; Toothman, D A; Kaplan, N

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  6. Comparing methodologies for the allocation of overhead and capital costs to hospital services.

    Science.gov (United States)

    Tan, Siok Swan; van Ineveld, Bastianus Martinus; Redekop, William Ken; Hakkaart-van Roijen, Leona

    2009-06-01

    Typically, little consideration is given to the allocation of indirect costs (overheads and capital) to hospital services, compared to the allocation of direct costs. Weighted service allocation is believed to provide the most accurate indirect cost estimation, but the method is time consuming. To determine whether hourly rate, inpatient day, and marginal mark-up allocation are reliable alternatives for weighted service allocation. The cost approaches were compared independently for appendectomy, hip replacement, cataract, and stroke in representative general hospitals in The Netherlands for 2005. Hourly rate allocation and inpatient day allocation produce estimates that are not significantly different from weighted service allocation. Hourly rate allocation may be a strong alternative to weighted service allocation for hospital services with a relatively short inpatient stay. The use of inpatient day allocation would likely most closely reflect the indirect cost estimates obtained by the weighted service method.

  7. A level playing field: Obtaining consistent cost estimates for advanced reactor designs

    International Nuclear Information System (INIS)

    Hudson, C.R. II; Rohm, H.H.; Humphreys, J.R. Jr.

    1987-01-01

    Rules and guidelines for developing cost estimates are given which provide a means for presenting cost estimates for advanced concepts on a consistent and equitable basis. For advanced reactor designs, the scope of a cost estimate includes the plant capital cost, the operating and maintenance cost, the fuel cycle cost, and the cost of decommissioning. Each element is subdivided as is necessary to provide a common reporting format for all power plant concepts. The total generation cost is taken to be a suitable choice for a summary figure of merit. To test the application of the rules and guidelines as well as developing reference costs for current technologies, several different sized coal and pressurized water reactor plant cost estimates have been prepared

  8. Influences of the Capital Structure and the Cost of Capital on Financial Performance. Case Study on ENGIE Group

    Directory of Open Access Journals (Sweden)

    Elena Valentina IVASCU

    2017-06-01

    Full Text Available The main objectives of the company's financial management are to ensure financial performances and to choose the capital structure that corresponds to the lowest total cost of capital. The purpose of this paper is to analyse the relationship between the capital structure and cost, and the financial performance of Engie Transnational Group, one of the most important global electricity producers. The data used were extracted from the Amadeus and Bloomberg databases for the period 2010-2015. Financial performance was analysed both by creating and proposing an aggregate index, as well as based on the Z Conan & Holder score. The company's financial structure was analysed on the basis of the total leverage ratio and for the total cost of capital, the weighted average capital cost formula was used. The results obtained at the Engie Group level show that the capital structure is predominantly indebted, and the maximum financial performance is obtained when the financial structure is minimal and the weighted average capital cost is maximum. The reversed relationship between the financial structure and the financial performance is in accordance with the financial structure theories of information asymmetry, pecking order and dynamic trade-off. The reversed relationship is confirmed in all Engie Group companies, except one company from United Kingdom.

  9. Cost of Equity Estimation in Fuel and Energy Sector Companies Based on CAPM

    Science.gov (United States)

    Kozieł, Diana; Pawłowski, Stanisław; Kustra, Arkadiusz

    2018-03-01

    The article presents cost of equity estimation of capital groups from the fuel and energy sector, listed at the Warsaw Stock Exchange, based on the Capital Asset Pricing Model (CAPM). The objective of the article was to perform a valuation of equity with the application of CAPM, based on actual financial data and stock exchange data and to carry out a sensitivity analysis of such cost, depending on the financing structure of the entity. The objective of the article formulated in this manner has determined its' structure. It focuses on presentation of substantive analyses related to the core of equity and methods of estimating its' costs, with special attention given to the CAPM. In the practical section, estimation of cost was performed according to the CAPM methodology, based on the example of leading fuel and energy companies, such as Tauron GE and PGE. Simultaneously, sensitivity analysis of such cost was performed depending on the structure of financing the company's operation.

  10. Cost of Equity Estimation in Fuel and Energy Sector Companies Based on CAPM

    Directory of Open Access Journals (Sweden)

    Kozieł Diana

    2018-01-01

    Full Text Available The article presents cost of equity estimation of capital groups from the fuel and energy sector, listed at the Warsaw Stock Exchange, based on the Capital Asset Pricing Model (CAPM. The objective of the article was to perform a valuation of equity with the application of CAPM, based on actual financial data and stock exchange data and to carry out a sensitivity analysis of such cost, depending on the financing structure of the entity. The objective of the article formulated in this manner has determined its’ structure. It focuses on presentation of substantive analyses related to the core of equity and methods of estimating its’ costs, with special attention given to the CAPM. In the practical section, estimation of cost was performed according to the CAPM methodology, based on the example of leading fuel and energy companies, such as Tauron GE and PGE. Simultaneously, sensitivity analysis of such cost was performed depending on the structure of financing the company’s operation.

  11. Trends in the capital costs of CANDU generating stations

    International Nuclear Information System (INIS)

    Yu, A.M.

    1982-09-01

    This paper consolidates the actual cost experience gained by Atomic Energy of Canada Limited, Ontario Hydro, and other Canadian electric utlities in the planning, design and construction of CANDU-PHWR (CANada Deuterium Uranium-Pressurized Heavy Water Reactor) generating stations over the past 30 years. For each of the major CANDU-PHWR generating stations in operation and under construction in Canada, an analysis is made to trace the evolution of the capital cost estimates. Major technical, economic and other parameters that affect the cost trends of CANDU-PHWR generating stations are identified and their impacts assessed. An analysis of the real cost of CANDU generating stations is made by eliminating interest during construction and escalation, and the effects of planned deferment of in-service dates. An historical trend in the increase in the real cost of CANDU power plants is established. Based on the cost experience gained in the design and construction of CANDU-PHWR units in Canada, as well as on the assessment of parameters that influence the costs of such projects, the future costs of CANDU-PHWRs are presented

  12. Estimation of cost function in the natural gas industry

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Duk [Korea Energy Economics Institute, Euiwang (Korea)

    1999-02-01

    The natural gas industry in Korea has characteristics of a dual industrial structure with wholesale and retail and a regional monopoly of city gas company. Recently there have been discussions on the restructuring of gas industry and the problems arising from such industrial organization. At this point, the labor and capital cost of KOGAS were analyzed to find out efficiency of KOGAS, the wholesaler and the cost function focusing on distribution was estimated to find out effect of scale of city gas company, the retailer. As a result, in the case of KOGAS, it is prove that enhancing competitive power is needed by improving labor productivity through stabilization of labor structure and by maximizing value-added through stability of capital combination. From the estimation of cost function of city gas companies, the existing regional monopoly of city gas company have effects on its scale only when the area of operation and end users used the same amount per end user are increased. (author). 31 refs., 10 figs., 43 tabs.

  13. Cost Estimates and Investment Decisions

    International Nuclear Information System (INIS)

    Emhjellen, Kjetil; Emhjellen Magne; Osmundsen, Petter

    2001-08-01

    When evaluating new investment projects, oil companies traditionally use the discounted cashflow method. This method requires expected cashflows in the numerator and a risk adjusted required rate of return in the denominator in order to calculate net present value. The capital expenditure (CAPEX) of a project is one of the major cashflows used to calculate net present value. Usually the CAPEX is given by a single cost figure, with some indication of its probability distribution. In the oil industry and many other industries, it is common practice to report a CAPEX that is the estimated 50/50 (median) CAPEX instead of the estimated expected (expected value) CAPEX. In this article we demonstrate how the practice of using a 50/50 (median) CAPEX, when the cost distributions are asymmetric, causes project valuation errors and therefore may lead to wrong investment decisions with acceptance of projects that have negative net present values. (author)

  14. Cost-based industrial enterprise human capital management

    Directory of Open Access Journals (Sweden)

    Glukhov Sergei

    2017-01-01

    Full Text Available The paper focuses on importance of human capital in development of industrial enterprises, issues of their management and methods of achieving balance between interests of owners and employees. Difference between such concepts as human and labor potential as well as human and working capital is clarified. The special attention is paid to the fact that an effective system of motivation and incentivation of labor is to serve as means of rapprochement of human and labor capital. The authors point out the limited scope of the traditional forms of labor motivation and incentivation mechanisms and highlight the complexity of their encouragement for collective work results. The authors suggest using the cost-based approach to workforce management, which is based on assessment of market and intrinsic value of human capital in view of investment and quality characteristics. The proposed approach is attended by methodological support and operational calculations. The study states that the suggested human capital management model can be introduced into practice, as well as substantiates the necessity for boosting the performance of industrial enterprises and their cost by increasing production, stimulating the staff for selfrealization and self-improvement by bringing the owners’ corporate interests closer to the interests of the employees.

  15. 48 CFR 52.215-17 - Waiver of Facilities Capital Cost of Money.

    Science.gov (United States)

    2010-10-01

    ... Capital Cost of Money. 52.215-17 Section 52.215-17 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.215-17 Waiver of Facilities Capital Cost of Money. As prescribed in 15.408(i), insert the following clause: Waiver of Facilities Capital Cost of Money (OCT 1997) The Contractor did not...

  16. Reduction of capital costs of nuclear power plants. NEA-report

    International Nuclear Information System (INIS)

    2000-01-01

    Since the the mid-1980s, the declining real prices of fossil fuels and the significant improvements in thermal efficiencies of combined cycle power plants have eroded the economic competitiveness of nuclear power plants in most OECD countries. In order for nuclear power to remain a viable option for the next millennium, the cost of electricity from nuclear power plant must be greatly reduced to be competitive with alternative sources. Of the three major components of nuclear generation cost - capital, O and M and fuel - the capital cost component makes up approximately 60 per cent of the total. Therefore, identification of the means to reduce the capital costs of nuclear power plants is a high priority activity toward keeping nuclear power competitive. Among a number of capital cost reduction measures, the principal ones were agreed by the expert group as follows: Increased plant size, improved construction methods, reduced construction schedule, design improvement, improved procurement, organisation and contractual aspects, standardisation and construction in series, multiple unit construction, regulatory and policy reform. (orig.)

  17. Development cost capitalization during R&D races

    NARCIS (Netherlands)

    Waegenaere, Anja M.B.; Sansing, R.C.; Wielhouwer, J.L.

    We investigate the economic effects of capitalizing development costs during a race between two firms to discover and develop a new technology. Winning the race requires success in the research stage and success in the development stage. Development costs are expensed in some settings, but

  18. Development Cost Capitalization During R&D Races

    NARCIS (Netherlands)

    De Waegenaere, A.; Sansing, R.C.; Wielhouwer, J.L.

    2017-01-01

    We investigate the economic effects of capitalizing development costs during a race between two firms to discover and develop a new technology. Winning the race requires success in the research stage and success in the development stage. Development costs are expensed in some settings, but

  19. Adjustment costs in a two-capital growth model

    Czech Academy of Sciences Publication Activity Database

    Duczynski, Petr

    2002-01-01

    Roč. 26, č. 5 (2002), s. 837-850 ISSN 0165-1889 R&D Projects: GA AV ČR KSK9058117 Institutional research plan: CEZ:AV0Z7085904 Keywords : adjustment costs * capital mobility * convergence * human capital Subject RIV: AH - Economics Impact factor: 0.738, year: 2002

  20. Social capital and transaction costs in millet markets.

    Science.gov (United States)

    Jacques, Damien Christophe; Marinho, Eduardo; d'Andrimont, Raphaël; Waldner, François; Radoux, Julien; Gaspart, Frédéric; Defourny, Pierre

    2018-01-01

    In sub-Saharan Africa, transaction costs are believed to be the most significant barrier that prevents smallholders and farmers from gaining access to markets and productive assets. In this study, we explore the impact of social capital on millet prices for three contrasted years in Senegal. Social capital is approximated using a unique data set on mobile phone communications between 9 million people allowing to simulate the business network between economic agents. Our approach is a spatial equilibrium model that integrates a diversified set of data. Local supply and demand were respectively derived from remotely sensed imagery and population density maps. The road network was used to establish market catchment areas, and transportation costs were derived from distances between markets. Results demonstrate that accounting for the social capital in the transaction costs explained 1-9% of the price variance depending on the year. The year-specific effect remains challenging to assess but could be related to a strengthening of risk aversion following a poor harvest.

  1. Mandatory International Financial Reporting Standards Adoption and Cost of Equity Capital in Nigeria

    Directory of Open Access Journals (Sweden)

    Uwuigbe Uwalomwa

    2016-05-01

    Full Text Available This study examined the effect of mandatory International Financial Reporting Standards (IFRS adoption on the cost of equity capital on Nigerian firms and whether the cost of equity capital effect after adoption of IFRS can be moderated by Return on Equity. The study covered a sample of 11 listed companies in the industrial goods sector for the period 2011 and 2013. The data for the study was secondary data generated from the annual reports and stock market report websites. The cost of equity capital was shown as the expected return on the basic value of a share and computed based on pre and post-adoption data. Findings from the study revealed that there is a significant positive relationship between the cost of equity capital and IFRS adoption indicating that the cost of equity capital increased. The market-based performance measure failed to have significant effect on the cost of equity capital after mandatory adoption. The study recommends that policies that improve domestic savings, as a principal source of equity capital, be enacted as an increase should lead to a reduction in the cost of equity capital, interest rates and increase the appeal of equity and foreign investments.

  2. The integrated supplier: key to cost management and multi-franchise capitation contracting.

    Science.gov (United States)

    Schuweiler, R C

    1996-05-01

    Capitation...most healthcare providers do not work under it, comprehend it, or even want it, yet supply capitation contracting seminars are popping up everywhere creating the feeling that the bandwagon is leaving, and it might be time to get on board. Not true. Supply capitation is not for all organizations. Capitation contracting is not easy and there are not many successful models to help the uninitiated. If a panacea is sought for reducing supply costs, capitation is only one component of a systematic strategy to reduce materiel costs. This article suggests a direction using the Group Health Materiel Management (Group Health Cooperative of Puget Sound, WA) experience as a point of reference. It advocates a systematic approach that focuses on expense reduction in: cost of goods, holding cost of inventory, labor cost associated with all materiel processes, distribution cost (transportation and par stock pick, pack, and replenishment), product utilization, variation in product standards, and waste stream byproducts. At Group Health (GH) these issues are primarily addressed through the use of: information systems, supplier certification/selection processes, group purchasing compliance, supply channel management, supply capitation contracting programs, standardization, and utilization management. Because of managed care organizational structure, Group Health Cooperative supply capitation contracting, as performed at GH, is discussed not as a quick fix solution but in the spirit of sharing our experience with others who may be considering it as a cost savings tactic in the context of a broad-based materiel management strategy. This article highlights the experiences of GH beginning with materiel management's business process assumptions toward multiple-franchise supply capitation.

  3. Cost of Capital when Dividends are Deductible

    Directory of Open Access Journals (Sweden)

    Ignacio Velez-Pareja

    2011-09-01

    Full Text Available Tax savings and the discount rate we use to calculate their value are involved in the calculation of cost of capital. Based on previous findings, we derive a general approach to cash flow valuation that take into account any kind of tax shields related to the financing decision of a firm and any date when they are earned. They can be used to introduce any type of externality that creates value through tax savings not captured by neither the cost of debt nor the cost of equity. This paper develops the formulations for the cost of capital when dividends, interest on equity or monetary correction of equity are deductible as it happens in Brazil. It shows that when properly done most known valuation methods are consistent and give identical results. Also, the paper argues that when dividends are tax deductible, optimal leverage is lower and equity value is higher.

  4. PENGARUH STRUKTUR KEPEMILIKAN DALAM MEKANISME CORPORATE GOVERNANCE TERHADAP COST OF EQUITY CAPITAL

    Directory of Open Access Journals (Sweden)

    tarjo tarjo

    2009-10-01

    Full Text Available Corporate governance mechanisms believed to have strong impact to the companies’ performance. Corporate governance mechanisms examined in this study are managerial ownership and institutional ownership structure. The purposes of this study are to know the variables effect of managerial ownership and institutional ownership on cost of equity capital. The samples of the study are firms listed in Jakarta Stock Exchange in 2005. The F-test on the all variables at the level confidence 1% indicates the effect of all variables on cost of equity capital is significant. The result of this study showed that managerial ownership and institutional ownership have positive significant impact (at the level of confidence 1% and 5% on the cost of equity capital. However this result showed that corporate governance mechanisms fail to decrease the cost of equity capital.  Keywords: corporate governance, managerial ownership, institutional ownership, cost of equity capital.

  5. The importance of capital cost reduction in improving nuclear economics

    International Nuclear Information System (INIS)

    Langmo, A.; Braun, C.

    1996-01-01

    In the developed countries having existing nuclear programs, the situation necessitates lower total power generation cost. The restructuring of utility industry due to the deregulation causes to reorganize the ownership of some nuclear plants, and the overall economics of nuclear plants in relation to their local competition is reexamined. The reluctance to make any new long term capital cost commitment arises, and it makes new plant construction less likely in near future, and plant upgrading and improvement to be put to intense scrutiny. The capital cost recovery in existing nuclear plants in USA is discussed. It is important to recognize that there is very little that can be done to affect already expended capital, and only that can be done is to improve plant capacity factors, besides write-off. The roles of architects and engineers in improved plant economics are now evaluated by the various organizations which are interested in the participation in new nuclear industry reorganization and restructuring. The reduction of operation and maintenance costs and capital investment, and the improvement of capacity factor are reported. In new ALWR construction program, architects and engineers can significantly support the control of plant capital costs by the selection of the plant design and the sites, and the strategies of procurement and contract, construction schedule and others. (K.I.)

  6. Mandatory IFRS adoption and the cost of Equity Capital. Evidence from Spanish Firms

    OpenAIRE

    David Castillo-Merino; Carlota Menéndez-Plans; Neus Orgaz-Guerrero

    2014-01-01

    Purpose: The main objective of this paper analyses the effects of mandatory International Financial Reporting Standards (IFRS) adoption by Spanish firms in 2005 on the cost of equity capital. Design/methodology: Using a sample of listed Spanish companies during the 1999 to 2009 period and a country-level focused analysis. To achieve our objective we relied on OLS regression analysis and estimate the dependent variable – the cost of equity – by using the proxy suggested in Easton (2004). Find...

  7. Disentangling the Effects of Corporate Disclosure on the Cost of Equity Capital: A Study of the Role of Intellectual Capital Disclosure

    OpenAIRE

    Mangena, M.; Li, J.; Tauringana, Venancio

    2016-01-01

    In this article, we investigate whether intellectual capital (IC) and financial disclosures jointly affect the firm’s cost of equity capital. In contrast to prior research, we disaggregate disclosures into IC and financial disclosures and examine whether the two disclosure types are jointly related to the cost of equity capital. We also investigate whether IC and financial disclosures have an interaction effect on the cost of equity capital. Using data for a sample of 125 U.K. firms, we find ...

  8. A Benchmark Estimate for the Capital Stock. An Optimal Consistency Method

    OpenAIRE

    Jose Miguel Albala-Bertrand

    2001-01-01

    There are alternative methods to estimate a capital stock for a benchmark year. These methods, however, do not allow for an independent check, which could establish whether the estimated benchmark level is too high or too low. I propose here an optimal consistency method (OCM), which may allow estimating a capital stock level for a benchmark year and/or checking the consistency of alternative estimates of a benchmark capital stock.

  9. Social capital and transaction costs in millet markets

    Directory of Open Access Journals (Sweden)

    Damien Christophe Jacques

    2018-01-01

    Full Text Available In sub-Saharan Africa, transaction costs are believed to be the most significant barrier that prevents smallholders and farmers from gaining access to markets and productive assets. In this study, we explore the impact of social capital on millet prices for three contrasted years in Senegal. Social capital is approximated using a unique data set on mobile phone communications between 9 million people allowing to simulate the business network between economic agents. Our approach is a spatial equilibrium model that integrates a diversified set of data. Local supply and demand were respectively derived from remotely sensed imagery and population density maps. The road network was used to establish market catchment areas, and transportation costs were derived from distances between markets. Results demonstrate that accounting for the social capital in the transaction costs explained 1–9% of the price variance depending on the year. The year-specific effect remains challenging to assess but could be related to a strengthening of risk aversion following a poor harvest.

  10. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1993-05-01

    Several advanced power plant concepts are currently under development. These include the Modular High Temperature Gas Cooled Reactors, the Advanced Liquid Metal Reactor and the Advanced Light Water Reactors. One measure of the attractiveness of a new concept is its cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electrical generation. This report provides a common starting point, whereby the cost estimates for the various power plants to be considered are developed with common assumptions and ground rules. Comparisons can then be made on a consistent basis. This is the second update of these cost estimate guidelines. Changes have been made to make the guidelines more current (January 1, 1992) and in response to suggestions made as a result of the use of the previous report. The principal changes are that the reference site has been changed from a generic Northeast (Middletown) site to a more central site (EPRI's East/West Central site) and that reference bulk commodity prices and labor productivity rates have been added. This report is designed to provide a framework for the preparation and reporting of costs. The cost estimates will consist of the overnight construction cost, the total plant capital cost, the operation and maintenance costs, the fuel costs, decommissioning costs and the power production or busbar generation cost

  11. Influences of the Capital Structure and the Cost of Capital on Financial Performance. Case Study on ENGIE Group

    OpenAIRE

    Elena Valentina IVASCU; Nicoleta BARBUTA-MISU

    2017-01-01

    The main objectives of the company's financial management are to ensure financial performances and to choose the capital structure that corresponds to the lowest total cost of capital. The purpose of this paper is to analyse the relationship between the capital structure and cost, and the financial performance of Engie Transnational Group, one of the most important global electricity producers. The data used were extracted from the Amadeus and Bloomberg databases for the period 2010-2015. Fin...

  12. THE ANALYSIS OF FINANCIAL EQUILIBRIUM THROUGH THE COST OF THE INVESTED CAPITAL

    Directory of Open Access Journals (Sweden)

    MELANIA ELENA MICULEAC

    2016-10-01

    Full Text Available The financial equilibrium of a company can be analyzed through the cost of the invested capital. It is the most pragmatic approach of the financial equilibrium analysis because it takes into account the cost of invested resources, their capacity to account return. I suggest a model to approach the analysis of the balanced average cost of the invested capital using the method of chain substitutions. I reached the conclusion that the main consequence of changes in the balanced average cost of the capital is on the company’s value.

  13. [Methodologies for estimating the indirect costs of traffic accidents].

    Science.gov (United States)

    Carozzi, Soledad; Elorza, María Eugenia; Moscoso, Nebel Silvana; Ripari, Nadia Vanina

    2017-01-01

    Traffic accidents generate multiple costs to society, including those associated with the loss of productivity. However, there is no consensus about the most appropriate methodology for estimating those costs. The aim of this study was to review methods for estimating indirect costs applied in crash cost studies. A thematic review of the literature was carried out between 1995 and 2012 in PubMed with the terms cost of illness, indirect cost, road traffic injuries, productivity loss. For the assessment of costs we used the the human capital method, on the basis of the wage-income lost during the time of treatment and recovery of patients and caregivers. In the case of premature death or total disability, the discount rate was applied to obtain the present value of lost future earnings. The computed years arose by subtracting to life expectancy at birth the average age of those affected who are not incorporated into the economically active life. The interest in minimizing the problem is reflected in the evolution of the implemented methodologies. We expect that this review is useful to estimate efficiently the real indirect costs of traffic accidents.

  14. PRAGMATICS OF USING A MODIFIED CAPM MODEL FOR ESTIMATING COST OF EQUITY ON EMERGING MARKETS

    Directory of Open Access Journals (Sweden)

    Vitaliy Semenyuk

    2016-11-01

    Full Text Available The aim of the work is to forming pragmatic recommendations for the development and implementation the modified CAPM model in the process of estimating the equity value on emerging markets. Original CAPM model allows estimating the cost of equity on the developed capital markets. At the same time it requires the information received on the market data basis. But, as show recent empirical research, the classical model does not always produce acceptable results of the equity estimation. In addition, CAPM model in its classical form can’t be used to estimate the cost of equity for countries with emerging markets. This is due with lower efficiency in emerging markets, with lower level of liquidity and capitalization, which makes the information obtained from these markets not entirely reliable. Therefore in practice are increasingly using different modification CAPM models, that allow consider for more specific factors which affect the cost of equity. These factors, which are not considered in the classical CAPM model, include the size of the corporation and country risk. The first factor is actual for developed and emerging markets and needed to account during the equity estimation and modification the CAPM model. Country risk is associated with differences and peculiarities of the economies different countries and in the first place should be taken into account when estimating the cost of equity in emerging capital markets, which are considered by investors as more risky for investment. This factor should also be taken into account in estimating the cost of equity. Methodology In the process of constructing a modified CAPM model, theoretical and methodological provisions were used, which are set out in the work R. Banz, G. Bekaert, M. Goedhart, R. Grabowski, R. Grinold, D. Vessels, A. Damodaran, M. Dempsey, J. Zhang, R. Ibbotson, P. Kaplan, T. Koller, K. Kroner, L. Kruschwitz, M. Long, A. Lofler, G. Mandl, M. Miller, F. Modilyani, K. Nunes, D

  15. Taxation, Corporate Financial Policy and the Cost of Capital

    OpenAIRE

    Alan J. Auerbach

    1982-01-01

    The cost of capital plays an important role in the allocation of resources among competing uses in a decentralized market system. The purpose of this paper is to organize and present what is known and what is hypothesized about the effects of taxation on the incentive to invest, via the cost of capital,taking full account of important issues that arise independently from the question of taxation. Included in the analysis is a discussion of empirical findings about the interaction of inflation...

  16. Corruption Significantly Increases the Capital Cost of Power Plants in Developing Contexts

    Directory of Open Access Journals (Sweden)

    Kumar Biswajit Debnath

    2018-03-01

    Full Text Available Emerging economies with rapidly growing population and energy demand, own some of the most expensive power plants in the world. We hypothesized that corruption has a relationship with the capital cost of power plants in developing countries such as Bangladesh. For this study, we analyzed the capital cost of 61 operational and planned power plants in Bangladesh. Initial comparison study revealed that the mean capital cost of a power plant in Bangladesh is twice than that of the global average. Then, the statistical analysis revealed a significant correlation between corruption and the cost of power plants, indicating that higher corruption leads to greater capital cost. The high up-front cost can be a significant burden on the economy, at present and in the future, as most are financed through international loans with extended repayment terms. There is, therefore, an urgent need for the review of the procurement and due diligence process of establishing power plants, and for the implementation of a more transparent system to mitigate adverse effects of corruption on megaprojects.

  17. Breast and prostate cancer productivity costs: a comparison of the human capital approach and the friction cost approach.

    Science.gov (United States)

    Hanly, Paul; Timmons, Aileen; Walsh, Paul M; Sharp, Linda

    2012-05-01

    Productivity costs constitute a substantial proportion of the total societal costs associated with cancer. We compared the results of applying two different analytical methods--the traditional human capital approach (HCA) and the emerging friction cost approach (FCA)--to estimate breast and prostate cancer productivity costs in Ireland in 2008. Data from a survey of breast and prostate cancer patients were combined with population-level survival estimates and a national wage data set to calculate costs of temporary disability (cancer-related work absence), permanent disability (workforce departure, reduced working hours), and premature mortality. For breast cancer, productivity costs per person using the HCA were € 193,425 and those per person using the FCA were € 8,103; for prostate cancer, the comparable estimates were € 109,154 and € 8,205, respectively. The HCA generated higher costs for younger patients (breast cancer) because of greater lifetime earning potential. In contrast, the FCA resulted in higher productivity costs for older male patients (prostate cancer) commensurate with higher earning capacity over a shorter time period. Reduced working hours postcancer was a key driver of total HCA productivity costs. HCA costs were sensitive to assumptions about discount and growth rates. FCA costs were sensitive to assumptions about the friction period. The magnitude of the estimates obtained in this study illustrates the importance of including productivity costs when considering the economic impact of illness. Vastly different results emerge from the application of the HCA and the FCA, and this finding emphasizes the importance of choosing the study perspective carefully and being explicit about assumptions that underpin the methods. Copyright © 2012 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  18. Reducing capital and operating costs in gas processing, liquefaction, and storage

    Energy Technology Data Exchange (ETDEWEB)

    Krusen, III, L C [Phillips Petroleum Co., Bartlesville, OK (United States). Research Div.

    1997-06-01

    The LNG industry is unanimous that capital costs must be reduced throughout the chain, and especially at the liquefaction facility including associated gas processing and LNG storage. The Ken ai LNG plant provides an example of how both reduced capital and operating costs were attained. This paper will cover cost production strategies that can be applied to liquefaction processes in general, and will than focus on their realization in the Phillips Optimized Cascade LNG process. The paper concludes that reduced LNG plant costs are attainable. (Author).

  19. Reducing capital and operating costs in gas processing, liquefaction, and storage

    International Nuclear Information System (INIS)

    Krusen, L.C. III

    1997-01-01

    The LNG industry is unanimous that capital costs must be reduced throughout the chain, and especially at the liquefaction facility including associated gas processing and LNG storage. The Ken ai LNG plant provides an example of how both reduced capital and operating costs were attained. This paper will cover cost production strategies that can be applied to liquefaction processes in general, and will than focus on their realization in the Phillips Optimized Cascade LNG process. The paper concludes that reduced LNG plant costs are attainable. (Author)

  20. Valuing productivity costs in a changing macroeconomic environment: the estimation of colorectal cancer productivity costs using the friction cost approach.

    Science.gov (United States)

    Hanly, Paul; Koopmanschap, Marc; Sharp, Linda

    2016-06-01

    The friction cost approach (FCA) has been proposed as an alternative to the human capital approach for productivity cost valuation. However, FCA estimates are context dependent and influenced by extant macroeconomic conditions. We applied the FCA to estimate colorectal cancer labor productivity costs and assessed the impact of a changing macroeconomic environment on these estimates. Data from colorectal cancer survivors (n = 159) derived from a postal survey undertaken in Ireland March 2010 to January 2011 were combined with national wage data, population-level survival data, and occupation-specific friction periods to calculate temporary and permanent disability, and premature mortality costs using the FCA. The effects of changing labor market conditions between 2006 and 2013 on the friction period were modeled in scenario analyses. Costs were valued in 2008 euros. In the base-case, the total FCA per-person productivity cost for incident colorectal cancer patients of working age at diagnosis was €8543. In scenario 1 (a 2.2 % increase in unemployment), the fall in the friction period caused total productivity costs to decrease by up to 18 % compared to base-case estimates. In scenario 2 (a 9.2 % increase in unemployment), the largest decrease in productivity cost was up to 65 %. Adjusting for the vacancy rate reduced the effect of unemployment on the cost results. The friction period used in calculating labor productivity costs greatly affects the derived estimates; this friction period requires reassessment following changes in labor market conditions. The influence of changes in macroeconomic conditions on FCA-derived cost estimates may be substantial.

  1. Spreadsheet tool for estimating noise reduction costs

    International Nuclear Information System (INIS)

    Frank, L.; Senden, V.; Leszczynski, Y.

    2009-01-01

    The Northeast Capital Industrial Association (NCIA) represents industry in Alberta's industrial heartland. The organization is in the process of developing a regional noise management plan (RNMP) for their member companies. The RNMP includes the development of a noise reduction cost spreadsheet tool to conduct reviews of practical noise control treatments available for individual plant equipment, inclusive of ranges of noise attenuation achievable, which produces a budgetary prediction of the installed cost of practical noise control treatments. This paper discussed the noise reduction cost spreadsheet tool, with particular reference to noise control best practices approaches and spreadsheet tool development such as prerequisite, assembling data required, approach, and unit pricing database. Use and optimization of the noise reduction cost spreadsheet tool was also discussed. It was concluded that the noise reduction cost spreadsheet tool is an easy interactive tool to estimate implementation costs related to different strategies and options of noise control mitigating measures and was very helpful in gaining insight for noise control planning purposes. 2 tabs.

  2. Estimating productivity costs using the friction cost approach in practice: a systematic review.

    Science.gov (United States)

    Kigozi, Jesse; Jowett, Sue; Lewis, Martyn; Barton, Pelham; Coast, Joanna

    2016-01-01

    The choice of the most appropriate approach to valuing productivity loss has received much debate in the literature. The friction cost approach has been proposed as a more appropriate alternative to the human capital approach when valuing productivity loss, although its application remains limited. This study reviews application of the friction cost approach in health economic studies and examines how its use varies in practice across different country settings. A systematic review was performed to identify economic evaluation studies that have estimated productivity costs using the friction cost approach and published in English from 1996 to 2013. A standard template was developed and used to extract information from studies meeting the inclusion criteria. The search yielded 46 studies from 12 countries. Of these, 28 were from the Netherlands. Thirty-five studies reported the length of friction period used, with only 16 stating explicitly the source of the friction period. Nine studies reported the elasticity correction factor used. The reported friction cost approach methods used to derive productivity costs varied in quality across studies from different countries. Few health economic studies have estimated productivity costs using the friction cost approach. The estimation and reporting of productivity costs using this method appears to differ in quality by country. The review reveals gaps and lack of clarity in reporting of methods for friction cost evaluation. Generating reporting guidelines and country-specific parameters for the friction cost approach is recommended if increased application and accuracy of the method is to be realized.

  3. DOES ECO-EFFICENCY REDUCE THE COST OF EQUITY CAPITAL? EMPIRICAL EVIDENCE FROM INDONESIA

    OpenAIRE

    Lisa Alviani; Mahfud Sholihin

    2015-01-01

    The objective of this study is to examine the effect of eco-efficiency on the cost of equity capital. The study hypothesizes that the implementation of eco-efficiency reduces the cost of equity capital. Using manufacturing companies listed on the Indonesian Stock Exchange for the period 2010-2012 as data, and controlling for beta, company size, Book to Market ratio, and leverage; the study finds that the implementation of eco-efficiency may reduce the cost of equity capital. The findings sugg...

  4. Does Eco-efficency Reduce the Cost of Equity Capital? Empirical Evidence From Indonesia

    OpenAIRE

    Alviani, Lisa; Sholihin, Mahfud

    2015-01-01

    The objective of this study is to examine the effect of eco-efficiency on the cost of equity capital. The study hypothesizes that the implementation of eco-efficiency reduces the cost of equity capital. Using manufacturing companies listed on the Indonesian Stock Exchange for the period 2010-2012 as data, and controlling for beta, company size, Book to Market ratio, and leverage; the study finds that the implementation of eco-efficiency may reduce the cost of equity capital. The findings sugg...

  5. Preliminary design and estimate of capital and operating costs for a production scale application of laser decontamination technology

    International Nuclear Information System (INIS)

    Pang, Ho-ming; Edelson, M.C.

    1994-01-01

    The application of laser ablation technology to the decontamination of radioactive metals, particularly the surfaces of equipment, is discussed. Included is information related to the design, capital and operating costs, and effectiveness of laser ablation technology, based on commercial excimer and Nd:YAG lasers, for the decontamination of production scale equipment

  6. Business capital accumulation and the user cost: is there a heterogeneity bias? JRC Working Papers in Economics and Finance, 2017/11

    OpenAIRE

    FATICA SERENA

    2017-01-01

    Empirical models of capital accumulation estimated on aggregate data series are based on the assumption that capital asset types respond in the same way to cost variables. Likewise, aggregate models do not consider potential heterogeneity in investment behavior originating on the demand side for capital, e.g. at the sector level. We show that the underlying assumption of homogeneity may indeed lead to misspecification of standard aggregate investment models. Using data from 23 sectors in 10 O...

  7. DOES ECO-EFFICENCY REDUCE THE COST OF EQUITY CAPITAL? EMPIRICAL EVIDENCE FROM INDONESIA

    Directory of Open Access Journals (Sweden)

    Lisa Alviani

    2015-05-01

    Full Text Available The objective of this study is to examine the effect of eco-efficiency on the cost of equity capital. The study hypothesizes that the implementation of eco-efficiency reduces the cost of equity capital. Using manufacturing companies listed on the Indonesian Stock Exchange for the period 2010-2012 as data, and controlling for beta, company size, Book to Market ratio, and leverage; the study finds that the implementation of eco-efficiency may reduce the cost of equity capital. The findings suggest that companies should implement eco-efficency.

  8. Impact of power purchases from nonutilities on the utility cost of capital

    International Nuclear Information System (INIS)

    Kahn, E.; Stoft, S.; Belden, T.

    1994-03-01

    This report studies the debt-equivalence debate empirically. The topics of the study include a review of the literature on the cost of equity capital for regulated utilities, a formulation of the debate on NUGs and the utility's cost of capital, a review of variable definitions and data sources, and a discussion of statistical issues and results

  9. Return on Capital and Cost of Capital: How does their Relation Affect Firm Value?

    OpenAIRE

    Halil D. Kaya; Julia S. Kwok; Elizabeth C. Rabe

    2015-01-01

    The Great Recession of 2008-2009 hurt almost all of the companies’ stock values in the United States. Interestingly, for Starbucks, the deterioration started a few years before the recession. From 2005 to 2007, the company’s stock price declined by approximately 40%. This case encourages students to examine the company’s return on capital, compare it to its cost of capital, and then relate this to the decline in the company’s stock price. First, they will establish a single formula for return...

  10. STAFF AND COMPANY VALUE MANAGEMENT ON THE BASIS OF HUMAN CAPITAL ESTIMATION

    Directory of Open Access Journals (Sweden)

    Dokukina S. M.

    2014-09-01

    Full Text Available The statement «the main asset of any company is its staff» has already become axiomatic. People is the only competitive advantage the companies have now, although for many years the possession of technologies is considered as a competitive advantage. The article covers essential questions connecting with staff management to executive strategy of value based management. The problems connected with the estimation of human capital as long-term factor of the company’s value growth are described. However one can implement in practice only in condition that it may be estimated or measured. The author puts forth his conception of the technique of human capital estimation. Approaches and methods of the estimation of human capital of company are systematized and described. The estimation of human capital elements allows to find out the potential of this intangible asset in order to increase the value of company.

  11. Effect of increased regulation on capital costs and manual labor requirements of nuclear power plants

    International Nuclear Information System (INIS)

    Paik, S.; Schriver, W.R.

    1981-01-01

    An attempt is made to explain the impact of increasing governmental regulation on capital costs and labor requirements for constructing light water reactor (LWR) electric power plants. The principal factors contributing to these increases are: (1) market conditions and (2) increased regulation. General market conditions include additional costs attributable to price inflation of equipment, material, labor, and the increased cost of money. The central objective of this work is to estimate the impact of increasing regulation on plant costs and, conversely, on output. To do this it is necessary to isolate two opposing sets of forces which have been in operation during the period of major regulatory expansion: learning based upon plant design experience and economies of scale with increasing size (generating capacity) of newer plants. Conceptual models are specified to capture the independent effects of increasing regulation, learning, and economies of scale. Empirical results were obtained by estimating the models on data collected from industry experience during the 1967-1980 period. 23 refs

  12. Proceedings of Symposium on Cost Estimating for Water Supply Planning Studies Held at Tampa, Florida on 14-16 March 1983.

    Science.gov (United States)

    1983-09-01

    cost estimating is defined, its characteris- tics are described, and the phases of preparing a planning level estimate and the interactions between the...cost data so as to assess the impacto of capital expenditures., OMetropolitan water utilities provide two things. They provide a product: potable

  13. Capital cost reimbursement to community hospitals under Federal health insurance programs.

    Science.gov (United States)

    Kinney, E D; Lefkowitz, B

    1982-01-01

    Issues in current capital cost reimbursement to community hospitals by Medicare and Medicaid are described, and options for change analyzed. Major reforms in the way the federal government pays for capital costs--in particular substitution of other methods of payment for existing depreciation reimbursement--could have significant impact on the structure of the health care system and on government expenditures. While such reforms are likely to engender substantial political opposition, they may be facilitated by broader changes in the reimbursement system.

  14. Economic agglomerations and spatio-temporal cycles in a spatial growth model with capital transport cost

    Science.gov (United States)

    Juchem Neto, J. P.; Claeyssen, J. C. R.; Pôrto Júnior, S. S.

    2018-03-01

    In this paper we introduce capital transport cost in a unidimensional spatial Solow-Swan model of economic growth with capital-induced labor migration, considered in an unbounded domain. Proceeding with a stability analysis, we show that there is a critical value for the capital transport cost where the dynamic behavior of the economy changes, provided that the intensity of capital-induced labor migration is strong enough. On the one hand, if the capital transport cost is higher than this critical value, the spatially homogeneous equilibrium of coexistence of the model is stable, and the economy converges to this spatially homogeneous state in the long run; on the other hand, if transport cost is lower than this critical value, the equilibrium is unstable, and the economy may develop different spatio-temporal dynamics, including the formation of stable economic agglomerations and spatio-temporal economic cycles, depending on the other parameters in the model. Finally, numerical simulations support the results of the stability analysis, and illustrate the spatio-temporal dynamics generated by the model, suggesting that the economy as a whole benefits from the formation of economic agglomerations and cycles, with a higher capital transport cost reducing this gain.

  15. Impact of Capital and Current Costs Changes of the Incineration Process of the Medical Waste on System Management Cost

    Science.gov (United States)

    Jolanta Walery, Maria

    2017-12-01

    The article describes optimization studies aimed at analysing the impact of capital and current costs changes of medical waste incineration on the cost of the system management and its structure. The study was conducted on the example of an analysis of the system of medical waste management in the Podlaskie Province, in north-eastern Poland. The scope of operational research carried out under the optimization study was divided into two stages of optimization calculations with assumed technical and economic parameters of the system. In the first stage, the lowest cost of functioning of the analysed system was generated, whereas in the second one the influence of the input parameter of the system, i.e. capital and current costs of medical waste incineration on economic efficiency index (E) and the spatial structure of the system was determined. Optimization studies were conducted for the following cases: with a 25% increase in capital and current costs of incineration process, followed by 50%, 75% and 100% increase. As a result of the calculations, the highest cost of system operation was achieved at the level of 3143.70 PLN/t with the assumption of 100% increase in capital and current costs of incineration process. There was an increase in the economic efficiency index (E) by about 97% in relation to run 1.

  16. The Relationship Between the Intellectual Capital Disclosure and Cost of Debt Capital – A Case of Slovenian Private Audited Organisations

    Directory of Open Access Journals (Sweden)

    Stropnik Neca

    2017-12-01

    Full Text Available The existing empirical research into the association between intellectual capital disclosures by organisations and the cost of debt is scarce or is based solely on the samples of the (large listed organisations. Since agency issues between management/owners and lenders exist also in (large private organisations whose financing is greatly dependent on loans and whose audited annual reports can be a source of additional information for external users, we performed an empirical research to find the answer to the question whether the level of intellectual capital disclosure (as a whole and of its sub-categories of organisations is associated with the cost of their debt capital. Our study was performed on a sample of private Slovenian organisations with audited annual reports. The results of our research did not reveal that lenders would take into account intellectual capital disclosures by Slovenian private audited organisations as the information about the potential for their future cash flows when deciding on the cost of debt issued to these organisations.

  17. The Differences Cost of Equity Capital between Before and After Adoption of IFRS

    Directory of Open Access Journals (Sweden)

    I Putu Sugiartha Sanjaya

    2017-11-01

    Full Text Available The objective of this study was to analyze and compare between cost of equity capital between before and after adoption of IFRS on Statement of Financial Accounting Standard Financial Instrument (PSAK for banking companies listed in Indonesian Stock Exchange. The period on this study was 2008-2009 for before adoption and 2013-2014 for after adoption. Data on this study was secondary data such as annual financial reporting and share price. Cost of equity capital was measured using Ohlson Model. Sample in this study was banking companies listed in Indonesian Stock Exchange in 2008, 2009, 2013, and 2014. Selecting sample was by purposive sampling with specific criteria. Results of this study proved that cost of equity capital was lower for after adoption of IFRS on Statement of Financial Accounting Standard Financial Instrument for banking companies listed in Indonesian Stock Exchange than before adoption. It meant that adoption IFRS could reduce cost of equity capital. This result had an impact on reducing non performing loan, increasing loan to deposit ratio, and increasing net interest margin.

  18. Customer value disclosure and cost of equity capital

    NARCIS (Netherlands)

    Orens, R.; Aerts, W.A.A.; Lybaert, N.

    2013-01-01

    Purpose – This paper seeks to examine the association between a firm's extent and precision of customer value disclosure and its implied cost of equity capital. In addition, it aims to investigate whether industry competition intensity attenuates this association. Design/methodology/approach – The

  19. CANDU 9 - reducing capital costs through advanced construction

    International Nuclear Information System (INIS)

    Hedges, K.; Yu, S.; Hopwood, J.

    1996-01-01

    Reducing costs is a clear priority in nuclear markets where capital reaches billions and financing is hard-won. To address that priority, AECL introduced the use of advanced construction techniques. This has been one of the key thrusts behind its development of CANDU 9. (author)

  20. Information and Heterogeneous Beliefs: Cost of Capital, Trading Volume, and Investor Welfare

    DEFF Research Database (Denmark)

    Christensen, Peter Ove; Qin, Zhenjiang

    In an incomplete market setting with heterogeneous prior beliefs, we show that public information can have a substantial impact on the ex ante cost of capital, trading volume, and investor welfare. In a model with exponential utility investors and an asset with a normally distributed dividend...... information system. In an effectively complete market setting, in which investors do not need to trade dynamically in order to take full advantage of their differences in beliefs, the ex ante cost of capital and the investor welfare are both higher than in the incomplete market setting......, the Pareto efficient public information system is the system which enjoys the maximum ex ante cost of capital, and the maximum expected abnormal trading volume. The public information system facilitates improved dynamic trading opportunities based on heterogeneously updated posterior beliefs in order to take...

  1. Information and Heterogeneous Beliefs: Cost of Capital, Trading Volume, and Investor Welfare

    DEFF Research Database (Denmark)

    Christensen, Peter Ove; Qin, Zhenjiang

    information system. In an effectively complete market setting, in which investors do not need to trade dynamically in order to take full advantage of their differences in beliefs, the ex ante cost of capital and the investor welfare are both higher than in the incomplete market setting......In an incomplete market setting with heterogeneous prior beliefs, we show that public information can have a substantial impact on the ex ante cost of capital, trading volume, and investor welfare. In a model with exponential utility investors and an asset with a normally distributed dividend......, the Pareto efficient public information system is the system which enjoys the maximum ex ante cost of capital, and the maximum expected abnormal trading volume. The public information system facilitates improved dynamic trading opportunities based on heterogeneously updated posterior beliefs in order to take...

  2. A comment on the cost of capital for investments with non-homogeneous components

    OpenAIRE

    Navas, Jorge; Marín Solano, Jesús

    2006-01-01

    In this paper, the expression for the cost of capital is derived when net and replacement investments exhibit differences in their effective prices due to a different fiscal treatment. It is shown that, contrary to previous results in the literature, the cost of capital should be constructed under an opportunity cost criterion rather than a historical one. This result has some important economic consequences, since the optimizing firm will take into account not only the effective price for th...

  3. Estimating the cost of epilepsy in Europe: a review with economic modeling.

    Science.gov (United States)

    Pugliatti, Maura; Beghi, Ettore; Forsgren, Lars; Ekman, Mattias; Sobocki, Patrik

    2007-12-01

    Based on available epidemiologic, health economic, and international population statistics literature, the cost of epilepsy in Europe was estimated. Europe was defined as the 25 European Union member countries, Iceland, Norway, and Switzerland. Guidelines for epidemiological studies on epilepsy were used for a case definition. A bottom-up prevalence-based cost-of-illness approach, the societal perspective for including the cost items, and the human capital approach as valuation principle for indirect costs were used. The cost estimates were based on selected studies with common methodology and valuation principles. The estimated prevalence of epilepsy in Europe in 2004 was 4.3-7.8 per 1,000. The estimated total cost of the disease in Europe was euro15.5 billion in 2004, indirect cost being the single most dominant cost category (euro8.6 billion). Direct health care costs were euro2.8 billion, outpatient care comprising the largest part (euro1.3 billion). Direct nonmedical cost was euro4.2 billion. That of antiepileptic drugs was euro400 million. The total cost per case was euro2,000-11,500 and the estimated cost per European inhabitant was euro33. Epilepsy is a relevant socioeconomic burden at individual, family, health services, and societal level in Europe. The greater proportion of such burden is outside the formal health care sector, antiepileptic drugs representing a smaller proportion. Lack of economic data from several European countries and other methodological limitations make this report an initial estimate of the cost of epilepsy in Europe. Prospective incidence cost-of-illness studies from well-defined populations and common methodology are encouraged.

  4. The Determinants Factors of the Capital Cost � Evidence from 5 EU Countries

    Directory of Open Access Journals (Sweden)

    Georgiana Sterea

    2016-07-01

    Full Text Available The aim of the paper is to highlight the importance and complexity of the company�s capital and its components and the extent to which its cost is influenced by several factors. In order to achieve this goal we have made a study on a sample of 15 companies from Romania and other 4 EU countries: Italy, Spain, France and Finland. All are SME�s and micro-enterprises that acting in the sector of "Growing of spices, aromatic, drug and pharmaceutical crops". For the study of capital cost determinants were selected five variables: return on equity, return on assets, general indebtedness, taxation and firm�s size in order to determine their influence on the cost of capital.

  5. OPPORTUNITY COST OF EDUCATIONAL HUMAN CAPITAL INVESTMENT. APPLICATION FOR THE POSITION OF BENEFICIARY-INVESTOR

    OpenAIRE

    Florea Voiculescu

    2009-01-01

    The present paper focuses on providing a model of applying the opportunitycost concept on investments in human educational capital. In the first part we haveshown that the real costs of educational capital investment does not involve direct andindirect educational costs only but also the opportunity costs, i.e. the earnings that arelost by choosing to invest in education (and not in something else). From our researchthere results the fact that the share of the opportunity cost within the tota...

  6. Corporate tax avoidance and ex ante equity cost of capital in Europe

    OpenAIRE

    Pulido, Matilde; Barros, Victor

    2017-01-01

    The aim of this paper is to study the longstanding relationship between corporate tax avoidance and ex ante equity cost of capital in Europe, taking into consideration country specific characteristics, which are essential in a context of corporate tax competition. We find that investors apprehend tax avoidance differently at distinct levels of tax avoidance. We provide strong evidence that as low tax avoidance firms engage in greater tax avoidance, the ex ante equity cost of capital decreases...

  7. Preliminary estimates of cost savings for defense high level waste vitrification options

    International Nuclear Information System (INIS)

    Merrill, R.A.; Chapman, C.C.

    1993-09-01

    The potential for realizing cost savings in the disposal of defense high-level waste through process and design modificatins has been considered. Proposed modifications range from simple changes in the canister design to development of an advanced melter capable of processing glass with a higher waste loading. Preliminary calculations estimate the total disposal cost (not including capital or operating costs) for defense high-level waste to be about $7.9 billion dollars for the reference conditions described in this paper, while projected savings resulting from the proposed process and design changes could reduce the disposal cost of defense high-level waste by up to $5.2 billion

  8. Willingness to pay and cost of illness for changes in health capital depreciation.

    Science.gov (United States)

    Ried, W

    1996-01-01

    The paper investigates the relationship between the willingness to pay and the cost of illness approach with respect to the evaluation of economic burden due to adverse health effects. The basic intertemporal framework is provided by Grossman's pure investment model, while effects on individual morbidity are taken to be generated by marginal changes in the rate of health capital depreciation. More specifically, both the simple example of purely temporary changes and the more general case of persistent variations in health capital depreciation are discussed. The analysis generates two principal findings. First, for a class of identical individuals cost as measured by the cost of illness approach is demonstrated to provide a lower bound on the true welfare cost to the individual, i.e. cost as given by the willingness to pay approach. Moreover, the cost of illness is increasing in the size of the welfare loss. Second, if one takes into account the possible heterogeneity of individuals, a clear relationship between the cost values supplied by the two approaches no longer exists. As an example, the impact of variations in either financial wealth or health capital endowment is discussed. Thus, diversity in individual type turns out to blur the link between cost of illness and the true economic cost.

  9. A level playing field-obtaining consistent cost estimates for advanced reactor designs

    International Nuclear Information System (INIS)

    Hudson, C.R.; Rohm, H.H.; Humphreys, J.R.

    1987-01-01

    A level playing field in sports is necessary to avoid a situation in which a team has an unfair advantage over its competition. Similarly, rules and guidelines for developing cost estimates can be established which, in effect, provide a level playing field whereby cost estimates for advanced power plant concepts can be presented on a consistent and equitable basis. As an example, consider the capital costs shown in Table 1. Both sets of cost are for the exact same power plant; Estimate 1 is expressed in constant dollars while Estimate 2 is presented in nominal or as-spent dollars. As shown, the costs in Table 1 are not directly comparable. Similar problems can be introduced as a result of differing assumptions in any number of parameters including the scope of the cost estimate, inflation/escalation and interest rates, contingency costs, and site location. Of course, the motivation for having consistent cost estimates is to permit comparison among various concepts. As the U.S. Department of Energy sponsors research and development work on several advanced reactor concepts in which expected cost is a key evaluation parameter, the emphasis in this particular endeavor has been in promoting the comparability of advanced reactor cost estimates among themselves and to existing power plant types. To continue with the analogy, the idea is to lay out the playing field and the rules of the contest such that each team participates in the match on an equal basis with the final score being solely determined by the inherent strengths and abilities of the teams. A description of the playing field and some of the more important rules will now be provided

  10. Level of voluntary disclosure and the cost of capital of Brazilian companies: 2008 to 2012

    Directory of Open Access Journals (Sweden)

    Ariana Ballestero

    2016-12-01

    Full Text Available This study analyzed whether the level of voluntary disclosure in the Brazilian market affects the cost of capital of companies listed on Bovespa during the period covering 2008 through 2012.  The sample was composed of 46 Brazilian non-financial institutions, building on and complementing previous research such as that carried out by Lima, Lima, Favero and Galdi (2007, Murcia and Santos (2009a, and Li and Yang (2013. The panel data regression model is employed to relate the independent variables with the following dependent variables: Cost of Equity, Cost of Debt and Weighted Average Cost of Capital. Findings permit the conclusion that some voluntary disclosure practices influence the cost of capital, i.e., when a company chooses to voluntarily disclose information in its annual reports, this information can affect its cost of equity and cost of debt.

  11. Market value calculation and the solution of circularity between value and the weighted average cost of capital WACC

    Directory of Open Access Journals (Sweden)

    Ignacio Vélez-Pareja

    2009-12-01

    Full Text Available Most finance textbooks present the Weighted Average Cost of Capital (WACC calculation as: WACC = Kd×(1-T×D% + Ke×E%, where Kd is the cost of debt before taxes, T is the tax rate, D% is the percentage of debt on total value, Ke is the cost of equity and E% is the percentage of equity on total value. All of them precise (but not with enough emphasis that the values to calculate D% y E% are market values. Although they devote special space and thought to calculate Kd and Ke, little effort is made to the correct calculation of market values. This means that there are several points that are not sufficiently dealt with: Market values, location in time, occurrence of tax payments, WACC changes in time and the circularity in calculating WACC. The purpose of this note is to clear up these ideas, solve the circularity problem and emphasize in some ideas that usually are looked over. Also, some suggestions are presented on how to calculate, or estimate, the equity cost of capital.

  12. Nuclear and coal-fired power plant capital costs 1978 -June 1981

    International Nuclear Information System (INIS)

    Harbour, R.T.

    1981-07-01

    This bibliography covers 16 papers dealing with the economics of power generation - mainly comparisons between the capital costs of nuclear and coal fired plants. Some of the papers additionally discuss fuel, operating and maintenance costs, and performance. (U.K.)

  13. The friction cost method: a comment.

    Science.gov (United States)

    Johannesson, M; Karlsson, G

    1997-04-01

    The friction cost method has been proposed as an alternative to the human-capital approach of estimating indirect costs. We argue that the friction cost method is based on implausible assumptions not supported by neoclassical economic theory. Furthermore consistently applying the friction cost method would mean that the method should also be applied in the estimation of direct costs, which would mean that the costs of health care programmes are substantially decreased. It is concluded that the friction cost method does not seem to be a useful alternative to the human-capital approach in the estimation of indirect costs.

  14. Factors affecting the minimum capital cost of a tokamak reactor

    International Nuclear Information System (INIS)

    Hancox, R.

    1981-01-01

    The Mk IIA Culham conceptual tokamak reactor design is a 2500 MWe steady-state reactor developed on the basis of a cost optimisation. A revised 1200 MWe conceptual design, the Mk IIB, used a lower wall loading and lower thermodynamic efficiency. A detailed costing of the Mk IIB design, however, showed it to have an unacceptably high capital cost. Since this high cost is a common characteristic of many fusion reactor designs, the cost optimisation of the Mk II design has been reconsidered. (author)

  15. Cost estimation tools in Germany and the UK. Comparison of cost estimates and actual costs

    International Nuclear Information System (INIS)

    Pfeifer, W.; Gordelier, S.; Drake, V.

    2005-01-01

    Full text: Accurate cost estimation for future decommissioning projects is a matter of considerable importance, especially for ensuring that sufficient funds will be available at the time of project implementation. This paper looks at the experience of cost estimation and real implementation outcomes from two countries, Germany and the UK, and draws lessons for the future. In Germany, cost estimates for the decommissioning of power reactors are updated every two years. For this purpose, the STILLKO program of the NIS Company is used. So far, Forschungszentrum Karlsruhe has successfully decommissioned two prototype reactor facilities. Re-cultivation of the premises has already been completed. At the moment, the activated components of the multi-purpose research reactor (MZFR), the first pressurized water reactor in Germany that was moderated and cooled with heavy water, and of the prototype fast breeder reactor (KNK) are being dismantled remotely. Consequently, vast experience exists in particular for the updating of total costs on the basis of actually incurred expenses. The further the dismantling work proceeds, the more reliable is the total cost estimate. Here, the development of the estimated MZFR decommissioning costs shall be presented and compared with the estimates obtained for a German reference PWR-type power reactor of 1200 MW. In this way: - common features of the prototype reactor and power reactor shall be emphasized, - several parameters leading to an increase in the estimated costs shall be highlighted, - cost risks shall be outlined with the remote dismantling of the reactor pressure vessel serving as an example, - calculation parameters shall be presented, and - recommendations shall be made for a consistent estimation of costs. The United Kingdom Atomic Energy Authority (UKAEA) has a major programme for the environmental remediation of its former research and development sites at Dounreay, Windscale, Harwell and Winfrith together with the need to

  16. Valuation, leverage and the cost of capital in the case of depreciable assets

    OpenAIRE

    Lund, Diderik

    2003-01-01

    Levy and Arditti (1973) introduced depreciable assets into the Modigliani and Miller (1958) model, and analyzed the implications for the cost of capital. Assuming that the firm reinvests indefinitely to maintain a constant expected cash flow, they found that depreciation increases the cost of capital before and after tax. Most of their assumptions are maintained. However, commitment to perpetual reinvestment is in most cases not a reasonable assumption. Without it, depreciation...

  17. Figuring what’s fair: The cost of equity capital for renewable energy in emerging markets

    International Nuclear Information System (INIS)

    Donovan, Charles; Nuñez, Laura

    2012-01-01

    The appropriate cost of capital for a renewable energy project depends upon an accurate measure of investment risk. Employing the conceptual framework of a commonly accepted asset pricing model, we analyze the risk faced by renewable energy investors in large emerging markets. We find that firms in Brazil, China and India expose multinational investors to the same risk as investing in emerging markets generally. The risk to domestic investors in those same firms ranges from substantially below-average to above-average, depending upon the country. The results are robust across several model versions and statistical techniques. With an eye toward government efforts to encourage the deployment of renewable energy in developing countries, we establish a range of estimates for the required return on equity capital in this fast-growing and politically important economic sector.

  18. Valuation, leverage and the cost of capital in the case of depreciable assets

    OpenAIRE

    Lund, Diderik

    2006-01-01

    Levy and Arditti (1973) introduced depreciable assets into the Modigliani and Miller (1958) model, and analyzed the implications for the cost of capital. Assuming that the firm reinvests indefinitely to maintain a constant expected cash flow, they found that depreciation increases the cost of capital before and after tax. Most of their assumptions are maintained. However, commitment to perpetual reinvestment is in most cases not a reasonable assumption. Without it, depreciation decreases the ...

  19. Asset management and the calculation of capital costs for mains-usage fees

    International Nuclear Information System (INIS)

    Huser, A.; Liggenstorfer, S.; Bill, M.

    2007-01-01

    This article discusses the requirements stipulated in the Swiss Electricity Supply Law that capital costs for all mains-levels must be declared on a yearly basis. The costs are calculated from current market value and depreciation according to technical lifetime. The authors examine the requirements placed on the declaration of capital costs and how they are calculated. The detailed book-keeping needed is discussed as is the large volume of data involved. The role of existing mains information systems is looked at, as are methods of assessing current assets. Experience gained in practice is discussed: This is taken as the basis for future processes. Utilities participating in the project and a number of solutions available are noted

  20. 26 CFR 1.179B-1T - Deduction for capital costs incurred in complying with Environmental Protection Agency sulfur...

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 3 2010-04-01 2010-04-01 false Deduction for capital costs incurred in... capital costs incurred in complying with Environmental Protection Agency sulfur regulations (temporary... the deduction allowable under section 179B(a) for qualified capital costs paid or incurred by a small...

  1. Estimating the costs of intensity-modulated and 3-dimensional conformal radiotherapy in Ontario.

    Science.gov (United States)

    Yong, J H E; McGowan, T; Redmond-Misner, R; Beca, J; Warde, P; Gutierrez, E; Hoch, J S

    2016-06-01

    Radiotherapy is a common treatment for many cancers, but up-to-date estimates of the costs of radiotherapy are lacking. In the present study, we estimated the unit costs of intensity-modulated radiotherapy (imrt) and 3-dimensional conformal radiotherapy (3D-crt) in Ontario. An activity-based costing model was developed to estimate the costs of imrt and 3D-crt in prostate cancer. It included the costs of equipment, staff, and supporting infrastructure. The framework was subsequently adapted to estimate the costs of radiotherapy in breast cancer and head-and-neck cancer. We also tested various scenarios by varying the program maturity and the use of volumetric modulated arc therapy (vmat) alongside imrt. From the perspective of the health care system, treating prostate cancer with imrt and 3D-crt respectively cost $12,834 and $12,453 per patient. The cost of radiotherapy ranged from $5,270 to $14,155 and was sensitive to analytic perspective, radiation technique, and disease site. Cases of head-and-neck cancer were the most costly, being driven by treatment complexity and fractions per treatment. Although imrt was more costly than 3D-crt, its cost will likely decline over time as programs mature and vmat is incorporated. Our costing model can be modified to estimate the costs of 3D-crt and imrt for various disease sites and settings. The results demonstrate the important role of capital costs in studies of radiotherapy cost from a health system perspective, which our model can accommodate. In addition, our study established the need for future analyses of imrt cost to consider how vmat affects time consumption.

  2. A Global-Scale Estimate of Ecosystem Services from Urban Agriculture: Understanding Incentives for Natural Capital in Cities

    Science.gov (United States)

    Clinton, N.; Stuhlmacher, M.; Miles, A.; Uludere, N.; Wagner, M.; Georgescu, M.; Herwig, C.; Gong, P.

    2017-12-01

    Despite substantial interest in urban agriculture, little is known about the aggregate benefits conferred by natural capital for growing food in cities. Here we perform a scenario-based analysis to quantify ecosystem services from adoption of urban agriculture at varying intensity. To drive the scenarios, we created global-scale estimates of vacant land, rooftop and building surface area, at one kilometer resolution, from remotely sensed and modeled geospatial data. We used national scale agricultural reports, climate and other geospatial data at global scale to estimate agricultural production and economic returns, storm-water avoidance, energy savings from avoided heating and cooling costs, and ecosystem services provided by nitrogen sequestration, pollination and biocontrol of pests. The results indicate that vacant lands, followed by rooftops, represent the largest opportunities for natural capital put to agricultural use in urban areas. Ecosystem services from putting such spaces to productive use are dominated by agricultural returns, but energy savings conferred by insulative characteristics of growth substrate also provide economic incentives. Storm water avoidance was estimated to be substantial, but no economic value was estimated. Relatively low economic returns were estimated from the other ecosystem services examined. In aggregate, approximately $10-100 billion in economic incentives, before costs, were estimated. The results showed that relatively developed, high-income countries stand the most to gain from urban agricultural adoption due to the unique combination of climate, crop mixture and crop prices. While the results indicate that urban agriculture is not a panacea for urban food security issues, there is potential to simultaneously ameliorate multiple issues around food, energy and water in urbanized areas.

  3. National waste terminal storage repository in a bedded salt formation for spent unreprocessed fuel. Special study No. 1. Twenty-five-year retrievability, decommissioning cost estimate

    International Nuclear Information System (INIS)

    1978-11-01

    This estimate covers decommissioning costs of facilities for the receipt, handling, and storage in bedded salt of canistered spent fuel assemblies from both BWR and PWR commercial power plants. The estimate includes all decommissioning costs for a repository, based on 25-year retrievability, constructed in accordance with the design shown in Conceptual Design Report (CDR), as modified by Special Study No. 1 (KE Report No. 78-60-RE) and decommissioned in accordance with the program outlined in the Conceptual Design Description Report, KE Report No. 78-58-R. Costs for Operating Contractor personnel on the site at this time are included in this report and not in the Operating Cost Estimate (KE Report 78-63-RE). The operating cost estimates end with the completion of storage room backfilling. The three major elements of decommissioning are: demolition of surface facilities, backfilling of main entries and airways, and shaft liner removal and shaft plugging. EDIT, ECON, and DELOX computer programs and a chart of accounts were furnished by UCC-ND under direction of the Government and the line item-capital-cost estimate was prepared according to the prescribed format. The decommissioning cost estimate referenced herein is in the same format as its companion line item-capital-cost estimate KE Report 78-62-RE

  4. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    Energy Technology Data Exchange (ETDEWEB)

    Glatzmaier, G.

    2011-12-01

    This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation

  5. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  6. Molten Salt: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO2

  7. Understanding the cost of capital of logistics service providers: an empirical investigation of multiple contingency variables

    OpenAIRE

    Lampe, Kerstin; Hofmann, Erik

    2014-01-01

    The article analyzes the influence of company-, industry- and market-related variables on the cost of capital of logistics service providers, as well as on their systematic risk. Financial information has become more and more important in strategic decision making (especially in the international context); in addition of being a measure of performance, the cost of capital is an important variable for logistics service providers in decisions about investing capital and developing the appropria...

  8. Learning Curve for Seawater Reverse Osmosis Desalination Plants: Capital Cost Trend of the Past, Present, and Future

    Science.gov (United States)

    Caldera, Upeksha; Breyer, Christian

    2017-12-01

    Seawater reverse osmosis (SWRO) desalination is expected to play a pivotal role in helping to secure future global water supply. While the global reliance on SWRO plants for water security increases, there is no consensus on how the capital costs of SWRO plants will vary in the future. The aim of this paper is to analyze the past trends of the SWRO capital expenditures (capex) as the historic global cumulative online SWRO capacity increases, based on the learning curve concept. The SWRO capex learning curve is found based on 4,237 plants that came online from 1977 to 2015. A learning rate of 15% is determined, implying that the SWRO capex reduced by 15% when the cumulative capacity was doubled. Based on SWRO capacity annual growth rates of 10% and 20%, by 2030, the global average capex of SWRO plants is found to fall to 1,580 USD/(m3/d) and 1,340 USD/(m3/d), respectively. A learning curve for SWRO capital costs has not been presented previously. This research highlights the potential for decrease in SWRO capex with the increase in installation of SWRO plants and the value of the learning curve approach to estimate future SWRO capex.

  9. Should large Spanish municipalities be financially compensated? Costs and benefits of being a capital/central municipality

    OpenAIRE

    Bosch Roca, Núria; Espasa Queralt, Marta; Montolio, Daniel

    2014-01-01

    We determine the costs and benefits of being a capital or central municipality, where central costs are understood to be incurred specifically as a result of the problems large municipalities located at the centre of an urban agglomeration face (including costs associated with social issues, immigration, commuting and diseconomies of scale) and capital costs result from the presence of regional and/or central government institutions in the municipality (loss of revenue or increase in expendit...

  10. Cost function estimation

    DEFF Research Database (Denmark)

    Andersen, C K; Andersen, K; Kragh-Sørensen, P

    2000-01-01

    on these criteria, a two-part model was chosen. In this model, the probability of incurring any costs was estimated using a logistic regression, while the level of the costs was estimated in the second part of the model. The choice of model had a substantial impact on the predicted health care costs, e...

  11. Revised cost savings estimate with uncertainty for enhanced sludge washing of underground storage tank waste

    International Nuclear Information System (INIS)

    DeMuth, S.

    1998-01-01

    Enhanced Sludge Washing (ESW) has been selected to reduce the amount of sludge-based underground storage tank (UST) high-level waste at the Hanford site. During the past several years, studies have been conducted to determine the cost savings derived from the implementation of ESW. The tank waste inventory and ESW performance continues to be revised as characterization and development efforts advance. This study provides a new cost savings estimate based upon the most recent inventory and ESW performance revisions, and includes an estimate of the associated cost uncertainty. Whereas the author's previous cost savings estimates for ESW were compared against no sludge washing, this study assumes the baseline to be simple water washing which more accurately reflects the retrieval activity along. The revised ESW cost savings estimate for all UST waste at Hanford is $6.1 B ± $1.3 B within 95% confidence. This is based upon capital and operating cost savings, but does not include development costs. The development costs are assumed negligible since they should be at least an order of magnitude less than the savings. The overall cost savings uncertainty was derived from process performance uncertainties and baseline remediation cost uncertainties, as determined by the author's engineering judgment

  12. Recent proposal for the estimation of household human capital

    Directory of Open Access Journals (Sweden)

    Giorgio Vittadini

    2008-03-01

    Full Text Available Dagum and Slottje (2000 estimated household Human Capital (HC as a Latent Variable (LV proposing its monetary estimation by means of an actuarial approach. This paper introduces an improved method for the estimation of household HC as LV by means of formative and reflective indicators in agreement with the accepted economic definition of HC. The monetary HC distribution, estimated for Italian (2000 and US (2004 household, is used in a recursive causal model to explore the role of HC in macroeconomy.

  13. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium using existing facilities at Hanford: alternative 11B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF)

  14. Influence of Components of Net Working Capital on Costs of Companies Manufacturing Machinery and Equipment in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zdeněk Motlíček

    2015-01-01

    Full Text Available The approach to working capital management significantly affects the performance of companies. Nevertheless, this effect varies depending on the observed industry and company’s size and it may be assumed that it is also dependent on territory differences. The paper presents an empirical research aiming to identify particular links between net working capital and costs of the company. The outcomes indicate a relatively strong positive correlation between the variables, especially in case of inventory. Furthermore he ratio of financial costs to ordinary costs is low, as well as the impact of net working capital components on financial costs. It follows that a focus on collection period would not lead to significant savings. The findings appropriately complement Czech and foreign literature focused more on impact of net working capital or working capital on profitability indicators. Further studies concerning a more detailed analysis of the influence of net working capital on corporate costs are difficult to be found. The present research has been conducted on medium-sized companies located in the Czech Republic and manufacturing machinery and equipment. The obtained results suggest the most suitable area of focus for optimization of working capital in relation to costs for the types of companies defined above.

  15. Economic impact of malignant mesothelioma in Italy: an estimate of the public and social costs.

    Science.gov (United States)

    Buresti, Giuliana; Colonna, Fabrizio; Corfiati, Marisa; Valenti, Antonio; Persechino, Benedetta; Marinaccio, Alessandro; Rondinone, Bruna Maria; Iavicoli, Sergio

    2017-10-27

    Despite their considerable interest for public health policies and for occupational disease management and assessment, the economic costs of asbestos-related diseases (ARDs) for society have not been fully estimated or even frequently discussed. The aim of this study was to estimate the economic burden of mesothelioma in Italy by assessing the overall societal cost of the disease, applying an econometric model. We analyzed two main cost groups, public and social. The first includes expenditure borne by the State and other public bodies (medical care costs, insurance, tax and benefits), while the latter uses the human capital approach to measure the loss of productivity suffered by the economy as a whole. We provide an estimate of euro 33,000 per patient for medical care costs and euro 25,000 for insurance and compensation; tax and benefits seem to roughly compensate. We estimated a loss of more than euro 200,000 per patient, in terms of loss of production. This study offers a practical approach for estimating the economic impact of mesothelioma, and provides empirical evidence of the huge economic burden linked to this disease, with its high etiologic fraction.

  16. Les estimations du capital humain au Canada : approche fondee sur le revenu de la vie entiere

    OpenAIRE

    Gu, Wulong; Wong, Ambrose

    2010-01-01

    Dans le present document, nous produisons une estimation de l'investissement en capital humain fonde sur le marche et du stock de ce capital au Canada au cours de la periode s'etendant de 1970 a 2007 selon l'approche fondee sur le revenu de la vie entiere. Nous comparons cette estimation a celle de l'investissement en capital physique et naturel et du stock de ce capital. En suivant la methode elaboree par Jorgenson et Fraumeni, nous estimons le stock de capital humain sous forme du revenu de...

  17. Regional economic activity and absenteeism: a new approach to estimating the indirect costs of employee productivity loss.

    Science.gov (United States)

    Bankert, Brian; Coberley, Carter; Pope, James E; Wells, Aaron

    2015-02-01

    This paper presents a new approach to estimating the indirect costs of health-related absenteeism. Productivity losses related to employee absenteeism have negative business implications for employers and these losses effectively deprive the business of an expected level of employee labor. The approach herein quantifies absenteeism cost using an output per labor hour-based method and extends employer-level results to the region. This new approach was applied to the employed population of 3 health insurance carriers. The economic cost of absenteeism was estimated to be $6.8 million, $0.8 million, and $0.7 million on average for the 3 employers; regional losses were roughly twice the magnitude of employer-specific losses. The new approach suggests that costs related to absenteeism for high output per labor hour industries exceed similar estimates derived from application of the human capital approach. The materially higher costs under the new approach emphasize the importance of accurately estimating productivity losses.

  18. Return on capital of Brazilian electricity distributors: A comparative analysis

    International Nuclear Information System (INIS)

    Rocha, Katia; Camacho, Fernando; Braganca, Gabriel

    2007-01-01

    This paper analyzes the electricity distribution segment in Brazil from 1998 to 2005-after the conclusion of privatization process-trying to assess whether the return on capital invested was in line with the risk required in the segment. It concludes that the return on equity in Brazil was systematically negative until 2003. Only in 2005 did the distribution segment really begin to recover, showing profitability consistent with the estimated cost of equity. Comparisons with Argentine, Chilean and American companies reveal that firms in the latter two countries, generally managed to reward shareholders according to the opportunity cost of capital. Estimates are that to sustain annual growth of roughly 3.7% for the next decade, the entire electricity sector will demand US$ 7 billion in capital expenditures a year for the next decade, 67% for generation, 16% for transmission and 17% for distribution. In order to stimulate private capital investment, it is fundamental for the regulator, in the tariff revision processes, to consistently assure a rate of return on capital in line with the segment's real opportunity cost and therefore maintain the health of all the three segments without the burden of subsidies

  19. Design approaches to achieve competitive LMFBR capital costs

    International Nuclear Information System (INIS)

    Arnold, W.H.; Ehrman, C.S.; Sharbaugh, J.E.; Young, W.H.

    1982-01-01

    Through analysis of the essential functional elements of an LMFBR, numerous ways were found to simplify system design, reduce the size of components and equipment, and eliminate some components and systems. The projected capital cost per net kW of this design is competitive with that of current PWRs. RandD programs and the construction and operation of CRBRP now are needed to prove out the features of this new design

  20. The financial cost of doctors emigrating from sub-Saharan Africa: human capital analysis.

    Science.gov (United States)

    Mills, Edward J; Kanters, Steve; Hagopian, Amy; Bansback, Nick; Nachega, Jean; Alberton, Mark; Au-Yeung, Christopher G; Mtambo, Andy; Bourgeault, Ivy L; Luboga, Samuel; Hogg, Robert S; Ford, Nathan

    2011-11-23

    To estimate the lost investment of domestically educated doctors migrating from sub-Saharan African countries to Australia, Canada, the United Kingdom, and the United States. Human capital cost analysis using publicly accessible data. Sub-Saharan African countries. Nine sub-Saharan African countries with an HIV prevalence of 5% or greater or with more than one million people with HIV/AIDS and with at least one medical school (Ethiopia, Kenya, Malawi, Nigeria, South Africa, Tanzania, Uganda, Zambia, and Zimbabwe), and data available on the number of doctors practising in destination countries. The financial cost of educating a doctor (through primary, secondary, and medical school), assuming that migration occurred after graduation, using current country specific interest rates for savings converted to US dollars; cost according to the number of source country doctors currently working in the destination countries; and savings to destination countries of receiving trained doctors. In the nine source countries the estimated government subsidised cost of a doctor's education ranged from $21,000 (£13,000; €15,000) in Uganda to $58,700 in South Africa. The overall estimated loss of returns from investment for all doctors currently working in the destination countries was $2.17bn (95% confidence interval 2.13bn to 2.21bn), with costs for each country ranging from $2.16m (1.55m to 2.78m) for Malawi to $1.41bn (1.38bn to 1.44bn) for South Africa. The ratio of the estimated compounded lost investment over gross domestic product showed that Zimbabwe and South Africa had the largest losses. The benefit to destination countries of recruiting trained doctors was largest for the United Kingdom ($2.7bn) and United States ($846m). Among sub-Saharan African countries most affected by HIV/AIDS, lost investment from the emigration of doctors is considerable. Destination countries should consider investing in measurable training for source countries and strengthening of their

  1. Falling Particles: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles.

  2. Rough order of magnitude cost estimate for immobilization of 50MT of plutonium using new facilities at the Savannah River site: alternative 12A

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in a new facility at Savannah River Site (SRS)

  3. Relationship between cost of equity capital and voluntary corporate disclosures

    NARCIS (Netherlands)

    Petrova, E.; Georgakopoulos, G.; Sotiropoulos, I.; Vasileiou, K.Z.

    2012-01-01

    The relationship between disclosure and cost of equity capital has always been interesting not only for managers, but for investors as well. Economic theory suggests that by increasing the level of corporate reporting firms not only increase their stock market liquidity, but they also decrease the

  4. How many Enrons? Mark-ups in the stated capital cost of independent power producers' (IPPs') power projects in developing countries

    International Nuclear Information System (INIS)

    Phadke, Amol

    2009-01-01

    I analyze the determinants of the stated capital cost of IPPs' power projects which significantly influences their price of power. I show that IPPs face a strong incentive to overstate their capital cost and argue that effective competition or regulatory scrutiny will limit the extent of the same. I analyze the stated capital costs of combined cycle gas turbine (CCGT) IPP projects in eight developing countries which became operational during 1990-2006 and find that the stated capital cost of projects selected without competitive bidding is 44-56% higher than those selected with competitive bidding, even after controlling for the effect of cost differences among projects. The extent to which the stated capital costs of projects selected without competitive bidding are higher compared those selected with competitive bidding, is a lower bound on the extent to which they are overstated. My results indicate the drawbacks associated with a policy of promoting private sector participation without an adequate focus on improving competition or regulation. (author)

  5. Manual of phosphoric acid fuel cell power plant cost model and computer program

    Science.gov (United States)

    Lu, C. Y.; Alkasab, K. A.

    1984-01-01

    Cost analysis of phosphoric acid fuel cell power plant includes two parts: a method for estimation of system capital costs, and an economic analysis which determines the levelized annual cost of operating the system used in the capital cost estimation. A FORTRAN computer has been developed for this cost analysis.

  6. The great environmental restoration cost estimating shootout: A blind test of three DOE cost estimating groups

    International Nuclear Information System (INIS)

    Klemen, Paul

    1992-01-01

    The cost of the Department of Energy's (DOE) Environmental Restoration (ER) Program has increased steadily over the last three years and, in the process, has drawn increasing scrutiny from Congress, the public, and government agencies such as the Office of Management and Budget and the General Accounting Office. Programmatic costs have been reviewed by many groups from within the DOE as well as from outside agencies. While cost may appear to be a universally applicable barometer of project conditions, it is actually a single dimensional manifestation of a complex set of conditions. As such, variations in cost estimates can be caused by a variety of underlying factors such as changes in scope, schedule, performing organization, economic conditions, or regulatory environment. This paper will examine the subject of cost estimates by evaluating three different cost estimates prepared for a single project including two estimates prepared by project proponents and another estimate prepared by a review team. The paper identifies the reasons for cost growth as measured by the different estimates and evaluates the ability of review estimates to measure the validity of costs. The comparative technique used to test the three cost estimates will identify the reasons for changes in the estimated cost, over time, and evaluate the ability of an independent review to correctly identify the reasons for cost growth and evaluate the reasonableness of the cost proposed by the project proponents. Recommendations are made for improved cost estimates and improved cost estimate reviews. Conclusions are reached regarding the differences in estimate results that can be attributed to differences in estimating techniques, the implications of these differences for decision makers, and circumstances that are unique to environmental cost estimating. (author)

  7. Standardization of PWR power plants: Impact of capital investment cost

    International Nuclear Information System (INIS)

    Vincent, C.

    1991-01-01

    The French program is certainly specific to the French context but it is a large and a real experiment of standardized series of units from which we can abstract the main ideas and ranges available in different contexts. It was estimated that the standardized part could reach more than 60% of the capital cost and this percentage does not take into account a regionalized part which also could have been standardized. The main condition is a large program which could be issued from a country or a partnership between different countries. That means, common terms of reference, lists of standardized equipment, same design documents. With a levelized rhythm of erection, beneficial effects of the series could be expected. The scale effect is fairly well known, also we can wonder for instance about the choice between five units of 600 MW and three units of 1000 MW. The answer is depending on the number of units and on the discount rate. (author)

  8. Capital rewarding of the electric power enterprises: a comparative analysis; Remuneracao de capital das distribuidoras de energia eletrica: uma analise comparativa

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, Katia; Braganca, Gabriel Fiuza de [Instituto de Pesquisa Economica Aplicada (IPEA), Brasilia, DF (Brazil)]. E-mails: katia@ipea.gov.br; gabriel@ipea.gov.br; Camacho, Fernando [Banco Nacional de Desenvolvimento Economico e Social (BNDES), Rio de Janeiro, RJ (Brazil)]. E-mail: camacho@bndes.gov.br

    2006-07-01

    We analyze the electricity distribution segment in Brazil from 1998 to June 2005, trying to assess whether the return on capital invested was in line with the risk and opportunity cost required in the segment. We conclude that the return on capital in this segment in Brazil was systematically negative until 2003. Only in 2005 did the distribution segment really begin to recover, presenting profitability partly consistent with the estimated cost of capital. Comparisons with Argentine, Chilean and American companies reveal that firms in the latter two countries, particularly in Chile, generally managed to reward shareholders according to the opportunity cost of capital. We find evidence of differential effects of regulatory characteristics between the price-cap and cost-plus regimes in the segment's financial profitability, since the return on capital invested was more uniform and predictable in American companies, which are subject to regulation by an internal rate of return or cost-plus mechanism, than in Brazilian firms, subject to price-cap regulation. Among the groups with greater return to profitability after the rationing episode in Brazil in 2002 are EDP Brazil, CPFL Energia, Neoenergia and starting in 2004, Elektro and companies still in government hands. The EDF Group performed the worst in the study period, with negative returns from 1999 onward. (author)

  9. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium using existing facilities at the Savannah River site: alternative 12B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons of plutonium using ceramic in an existing facility (221-F) at an Savannah River Site (SRS)

  10. Are Capital Buffers Countercyclical ? An Evidence From Pakistan

    Directory of Open Access Journals (Sweden)

    Romila Qamar

    2016-09-01

    Full Text Available New risk based capital requirement have pro-cyclical effect and causes negative externalities in the economy. During recession, on one side, quality of loan portfolio deteriorates and probability of default increases resulting into increased level of provisions and write off’s and reduced capital level. This causes an increase in capital requirements which becomes more expensive. Weaker banks fail to access new capital and ultimately reduce the credit supply. On the other side, banks are required to maintain the minimum capital which results into credit supply contraction and hits the bank’s profitability leading to a situation called Credit Crunch. This situation may prolong recession. During the crisis, developing countries are more affected than developed countries and this debate is entirely new in Pakistan. This research empirically investigates the pro-cyclical effect of new capital regulation under Basel II using panel data of 47 Pakistani Banks from 2001-2012. Particularly this paper examines the capital management mechanisms using capital buffers, using Generalized Method of Moments (GMM one step and two step estimation techniques on dynamic panel data model. The results gives evidence that capital buffer are counter-cyclical except in case of specialized banks because of difference in operations. The findings also suggest that adjustment costs, cost of raising capital and bankruptcy costs are major determines of holding capital buffer. Analysis confirms too big to fail hypothesis. Form the results, it is concluded that capital buffer are counter-cyclical, consistent with the hypothesis. The findings suggest the banks to adopt Basel III Accord.

  11. Total cost estimates for large-scale wind scenarios in UK

    International Nuclear Information System (INIS)

    Dale, Lewis; Milborrow, David; Slark, Richard; Strbac, Goran

    2004-01-01

    The recent UK Energy White Paper suggested that the Government should aim to secure 20% of electricity from renewable sources by 2020. A number of estimates of the extra cost of such a commitment have been made, but these have not necessarily included all the relevant cost components. This analysis sets out to identify these and to calculate the extra cost to the electricity consumer, assuming all the renewable electricity is sourced from wind energy. This enables one of the more controversial issues--the implications of wind intermittency--to be addressed. The basis of the assumptions associated with generating costs, extra balancing costs and distribution and transmission system reinforcement costs are all clearly identified and the total costs of a '20% wind' scenario are compared with a scenario where a similar amount of energy is generated by gas-fired plant. This enables the extra costs of the renewables scenario to be determined. The central estimate of the extra costs to electricity consumers is just over 0.3 p/kW h in current prices (around 5% extra on average domestic unit prices). Sensitivity analyses examine the implications of differing assumptions. The extra cost would rise if the capital costs of wind generation fall slower than anticipated, but would fall if gas prices rise more rapidly than has been assumed, or if wind plant are more productive. Even if it is assumed that wind has no capacity displacement value, the added cost to the electricity consumer rises by less than 0.1 p/kW h. It is concluded that there does not appear to be any technical reason why a substantial proportion of the country's electricity requirements could not be delivered by wind

  12. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at Hanford: alternatives 4A/8/10

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility, the Fuels and Materials Examination Facility (FMEF), at Hanford

  13. Allocative inefficiency and the capital-energy controversy

    International Nuclear Information System (INIS)

    Christopoulos, Dimitris K.; Tsionas, Efthymios G.

    2002-01-01

    The purpose of the paper is to estimate a system of input demands for Greek manufacturing deviating from the standard practice of assuming strict cost minimization. The study allows for the presence of price distortions and allocative inefficiency in the decision process. This assumption affects parameter estimates and estimated elasticities materially, and throws new light on the capital-energy controversy in Greek manufacturing

  14. Production of solidified high level wastes: a cost comparison of solidification processes

    International Nuclear Information System (INIS)

    1977-06-01

    Differential cost estimates of the annual operating and maintenance costs and the capital costs for five HLW Waste Solidification Alternates were developed. The annual operating and maintenance cost estimates included the cost of labor, consumables, utilities, shipping casks, shipping and disposal at a federal repository. The capital cost included the cost of the component, installation and building. The differential cost estimates do not include equipment and facilities which are either shared with the reprocessing facility or are common between all of the alternates. Total annual cost differential between the five waste form alternates is summarized in tabular form. The Borosilicate Glass Alternate has the lowest total annual cost. The other alternates have higher costs which range from $6.6 M to $7.4 M per year higher than the Glass alternate with the Supercalcine being the highest cost at $7.4 M per year differential. The major items in the cost estimates are then disposal costs in the operating cost estimates and the HLW Storage Tanks in the capital cost estimates. The Supercalcine Multibarrier Alternate ships 180 canisters per year more than the other alternates and consequently has a significantly higher operating cost. However, off-setting this the Supercalcine Multibarrier Alternate does not require HLW Storage Tanks for decay because of the high heat conductivity of this product and correspondingly the capital cost for this alternate is significantly lower than the other alternates. The radiological risk values are correlated with the cost evaluation normalized to cost ($)/MWe-yr

  15. The Psychology of Cost Estimating

    Science.gov (United States)

    Price, Andy

    2016-01-01

    Cost estimation for large (and even not so large) government programs is a challenge. The number and magnitude of cost overruns associated with large Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) programs highlight the difficulties in developing and promulgating accurate cost estimates. These overruns can be the result of inadequate technology readiness or requirements definition, the whims of politicians or government bureaucrats, or even as failures of the cost estimating profession itself. However, there may be another reason for cost overruns that is right in front of us, but only recently have we begun to grasp it: the fact that cost estimators and their customers are human. The last 70+ years of research into human psychology and behavioral economics have yielded amazing findings into how we humans process and use information to make judgments and decisions. What these scientists have uncovered is surprising: humans are often irrational and illogical beings, making decisions based on factors such as emotion and perception, rather than facts and data. These built-in biases to our thinking directly affect how we develop our cost estimates and how those cost estimates are used. We cost estimators can use this knowledge of biases to improve our cost estimates and also to improve how we communicate and work with our customers. By understanding how our customers think, and more importantly, why they think the way they do, we can have more productive relationships and greater influence. By using psychology to our advantage, we can more effectively help the decision maker and our organizations make fact-based decisions.

  16. Capital optimization: linking investment with strategic intent.

    Science.gov (United States)

    Fine, Allan; Bacchetti, J Alex

    2004-01-01

    With operating margins showing some improvement in 2003, Y2K being a distant memory, and many critical capital investment decisions delayed as long as possible, hospitals have been on a relative spending spree, building new facilities, renovating operating rooms and inpatient units, and investing in new medical and information technologies. However, with pressure on both cost and revenue expected to continue, if not increase, this spending spree may be short-lived, and hospitals must improve their capital planning efforts; align them with their mission, vision, and strategies; and ensure that capital is available when unplanned or even expected needs arise. This article explores some of the challenges that hospitals face in their capital planning efforts and, more importantly, suggests the necessity for hospitals to integrate capital and strategic planning. Capital planning must be driven by an organization's strategies; however, we also argue that an organization's ability to execute its strategies is highly dependent on the existence of a cohesive capital prioritization and planning process. In this article, we explore a number of issues critical to developing a comprehensive capital plan, including estimating capital costs, evaluating and designing strategies to contend with risk, saving for the proverbial "rainy day," and recognizing the role and value of philanthropy, while challenging some conventional thinking of hospital executives with respect to investment, growth, and planning.

  17. THE RELATIONSHIP BETWEEN THE COST OF EDUCATION AND THE HUMAN CAPITAL. THE ALIGNEMENT OF ROMANIA TO THE EUROPEAN STANDARDS

    Directory of Open Access Journals (Sweden)

    IOANA-JULIETA JOSAN

    2012-05-01

    Full Text Available Once with the development of the human capital theory, the education received an economic value, which is a quality variable of human resources and the main determinant of economic growth. The famed economists have shown that the remarkable economic effects of the investments in education influence the chances of acquiring a job and earnings, demonstrating how the theory justifies such an investment. Human capital approach allows also estimating the costs of education in schools and higher education, as well as the profits that comes out of it. Thus, the human capital theory is primarily focused on the demand for education. Moreover, the objective function of the state, in terms of education, contains itself two contradictory arguments: the state, theoretically, is a representative and guarantor of the collective good and its organizer; the state will seek to maximize individual education on the one hand and on the other hand will search for the optimization of the relationship between professional training and formal education. Also, in the context of recent years, the budgetary constraints are raising the problem of optimal allocation of the resources, as well as the funding of the performance of the educational services. The particularities, in terms of flexibility and cumulative distribution of the investment levels in the human factors, are translated into a practical action in the sense that global competition, from which Romania cannot decouple. In the long run, there are winning and resisting only those with academic flexible formation and the intelligent persons. Considering the above arguments, the purpose of this paper is to analyze the main characteristics of funding mechanisms for education systems, the volume of spending on education and ways of managing the resources allocated to the education. The cost allocation for education in Romania is investigated in terms of government policies, but also in terms of human capital theory

  18. Ventilation cost and air cleaning

    Science.gov (United States)

    Goodfellow, H. D.

    The components associated with the costs of the purchase of pollution control equipment are discussed. These include the capital cost to purchase the equipment and installation, and the costs incurred to operate the control device on an annual basis. Although the capital costs can represent a significant outlay of money, typically these costs are spread out over the life of the equipment. In general, this amortized cost is combined with the operating cost and is referred to as an 'annualized cost'. The annualized cost is a commonly used indicator to demonstrate the actual year to year cost that the equipment and operation will represent. Values and methods used to estimate costs, typical cost indicators, and sources of computerized costing models are presented. A comparison of the capital cost expenditure required for a model case (a cement kiln operation), using three control device alternatives is made.

  19. Comparing costs of power and heat production by prospective and present sources

    International Nuclear Information System (INIS)

    Novak, S.

    1979-01-01

    Capital and running costs are compared of power and heat production from different sources. The lowest capital costs were found for coal-fired power plants followed by light water reactor power plants. The capital costs of other types of power plants, such as wind, geothermal, solar, thermonuclear power plants are significantly higher. The estimated specific cost for electric power production in 1985 for a nuclear power plant is lower than for a fossil-fuel power plant. It is estimated that in 1985 coal will be the cheapest heat source. (Ha)

  20. Relative cost of capital for marginal firms over the business cycle

    OpenAIRE

    Gikas A. Hardouvelis; Thierry A. Wizman

    1992-01-01

    The authors compare the effects of the business cycle on the cost of capital faced by small, distressed firms and their larger, more financially secure counterparts. The analysis draws on stock market returns data for a broad range of traded companies during the 1963-91 period.

  1. Capital Adequacy, Cost Income Ratio and the Performance of Saudi Banks (2007-2011)

    OpenAIRE

    Ahmad Aref Almazari

    2013-01-01

    This paper examines the relationship between Capital adequacy and profitability. Necessary data were gathered from the financial statements of nine Saudi banks listed in the stock exchange market over the period of 2007-2011. The results of analyzing the data based on the implementation of linear regression technique reveals that there is a meaningful relationship between capital adequacy, cost-income ratio and bank size with profitability. Profitability represented in this study by the retur...

  2. TOPEX: An expert system for estimating and analyzing the operating costs of oil and gas production facilities

    International Nuclear Information System (INIS)

    Greffioz, J.; Olver, A.J.; Schirmer, P.

    1993-01-01

    TOPEX is a new approach to operating costs estimation of oil and gas installations. It does not rely on knowledge of the capital cost of the installation and uses a computerized expert system (or knowledge base). Estimates are generated from specific details of the equipment and systems and general databases of prices and man hours. A novel methodology has been developed for quantifying the operational complexity of an installation which is then correlated with operations manpower. The use of a computerized application allows rapid calculation of estimates so that what-if and sensitivity studies can be readily done. The knowledge base provides a powerful tool to handle the large amounts of data involved and acts as a repository for the expertise used in its development

  3. Approaches to estimating decommissioning costs

    International Nuclear Information System (INIS)

    Smith, R.I.

    1990-07-01

    The chronological development of methodology for estimating the cost of nuclear reactor power station decommissioning is traced from the mid-1970s through 1990. Three techniques for developing decommissioning cost estimates are described. The two viable techniques are compared by examining estimates developed for the same nuclear power station using both methods. The comparison shows that the differences between the estimates are due largely to differing assumptions regarding the size of the utility and operating contractor overhead staffs. It is concluded that the two methods provide bounding estimates on a range of manageable costs, and provide reasonable bases for the utility rate adjustments necessary to pay for future decommissioning costs. 6 refs

  4. Methodical approaches to value assessment and determination of the capitalization level of high-rise construction

    Science.gov (United States)

    Smirnov, Vitaly; Dashkov, Leonid; Gorshkov, Roman; Burova, Olga; Romanova, Alina

    2018-03-01

    The article presents the analysis of the methodological approaches to cost estimation and determination of the capitalization level of high-rise construction objects. Factors determining the value of real estate were considered, three main approaches for estimating the value of real estate objects are given. The main methods of capitalization estimation were analyzed, the most reasonable method for determining the level of capitalization of high-rise buildings was proposed. In order to increase the value of real estate objects, the author proposes measures that enable to increase significantly the capitalization of the enterprise through more efficient use of intangible assets and goodwill.

  5. Intercity passenger rail : Amtrak will continue to have difficulty controlling its costs and meeting capital needs

    Science.gov (United States)

    2000-05-01

    This report responds to the request to review Amtrak's costs and capital investment needs. In particular, this report discusses changes since 1995 in Amtrak's operating costs, including labor costs, payments to freight railroads to access their track...

  6. The Working Capital Funds Interim Migratory Accounting Strategy

    National Research Council Canada - National Science Library

    1997-01-01

    ... Operations Fund Corporate Board. We reviewed the completeness of the strategy and the reasonableness of the time frames and cost estimates for achieving auditable Working Capital Funds financial statements that comply with the Chief...

  7. Guideline to Estimate Decommissioning Costs

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Kim, Younggook; Oh, Jaeyoung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The primary objective of this work is to provide guidelines to estimate the decommissioning cost as well as the stakeholders with plausible information to understand the decommissioning activities in a reasonable manner, which eventually contribute to acquiring the public acceptance for the nuclear power industry. Although several cases of the decommissioning cost estimate have been made for a few commercial nuclear power plants, the different technical, site-specific and economic assumptions used make it difficult to interpret those cost estimates and compare them with that of a relevant plant. Trustworthy cost estimates are crucial to plan a safe and economic decommissioning project. The typical approach is to break down the decommissioning project into a series of discrete and measurable work activities. Although plant specific differences derived from the economic and technical assumptions make a licensee difficult to estimate reliable decommissioning costs, estimating decommissioning costs is the most crucial processes since it encompasses all the spectrum of activities from the planning to the final evaluation on whether a decommissioning project has successfully been preceded from the perspective of safety and economic points. Hence, it is clear that tenacious efforts should be needed to successfully perform the decommissioning project.

  8. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  9. ESTIMATING RISK ON THE CAPITAL MARKET WITH VaR METHOD

    Directory of Open Access Journals (Sweden)

    Sinisa Bogdan

    2015-06-01

    Full Text Available The two basic questions that every investor tries to answer before investment are questions about predicting return and risk. Risk and return are generally considered two positively correlated sizes, during the growth of risk it is expected increase of return to compensate the higher risk. The quantification of risk in the capital market represents the current topic since occurrence of securities. Together with estimated future returns it represents starting point of any investment. In this study it is described the history of the emergence of VaR methods, usefulness in assessing the risks of financial assets. Three main Value at Risk (VaR methodologies are decribed and explained in detail: historical method, parametric method and Monte Carlo method. After the theoretical review of VaR methods it is estimated risk of liquid stocks and portfolio from the Croatian capital market with historical and parametric VaR method, after which the results were compared and explained.

  10. Productivity Losses Associated with Head and Neck Cancer Using the Human Capital and Friction Cost Approaches.

    Science.gov (United States)

    Pearce, Alison M; Hanly, Paul; Timmons, Aileen; Walsh, Paul M; O'Neill, Ciaran; O'Sullivan, Eleanor; Gooberman-Hill, Rachael; Thomas, Audrey Alforque; Gallagher, Pamela; Sharp, Linda

    2015-08-01

    Previous studies suggest that productivity losses associated with head and neck cancer (HNC) are higher than in other cancers. These studies have only assessed a single aspect of productivity loss, such as temporary absenteeism or premature mortality, and have only used the Human Capital Approach (HCA). The Friction Cost Approach (FCA) is increasingly recommended, although has not previously been used to assess lost production from HNC. The aim of this study was to estimate the lost productivity associated with HNC due to different types of absenteeism and premature mortality, using both the HCA and FCA. Survey data on employment status were collected from 251 HNC survivors in Ireland and combined with population-level survival estimates and national wage data. The cost of temporary and permanent time off work, reduced working hours and premature mortality using both the HCA and FCA were calculated. Estimated total productivity losses per employed person of working age were EUR253,800 using HCA and EUR6800 using FCA. The main driver of HCA costs was premature mortality (38% of total) while for FCA it was temporary time off (73% of total). The productivity losses associated with head and neck cancer are substantial, and return to work assistance could form an important part of rehabilitation. Use of both the HCA and FCA approaches allowed different drivers of productivity losses to be identified, due to the different assumptions of the two methods. For future estimates of productivity losses, the use of both approaches may be pragmatic.

  11. The Impact of Corporate Governance and the Cost of Capital in Shipping

    Directory of Open Access Journals (Sweden)

    Vicky Zampeta

    2015-10-01

    Full Text Available Purpose - The main aim of this paper is to analyze the impact of corporate governance and the cost of capital in shipping industry. The present study grasps on a doctoral thesis aiming to analyze the above developments in the shipping industry in general and mostly in the Greek owed shipping companies and how these developments have been evaluated by the top executives based on a market research we have conducted. Design/methodology/approach - The main idea for the consolidation of the results of the regression methodology used is to analyze research hypotheses related to effects of Corporate Governance in the shipping industry, emerged in a previous article by Zampeta (2011 and Thalassinos and Zampeta (2012. The research hypotheses will be explored with econometric methodology to be confirmed or rejected depending on the statistical significance of the coefficients of the factors - variables selected and express their respective cases. The specific way of analyzing the answers from the questionnaires used sufficiently cover the concept of triangulation (triangulation because they use primary research data (sample analysis questionnaires, with acceptable bibliography concerning the impact of globalization and the evolution international trade financing cost of shipping enterprises. There is a need to exploit the results of the factorial analysis used by Zampeta (2011, Thalassinos and Zampeta (2012 and Thalassinos and Zampeta (2015 to the methodology of regression to analyze research hypotheses related to the Factor of the Cost of Capital and the Factor of Corporate Governance and their impacts in the Shipping Industry. Findings - The results of the subject research confirm the views of the top executives that specific explanatory variables are forming the factors referring to corporate governance and the cost of capital in the shipping industry. In addition, they have influenced the decision of the shipping companies to adopt the Corporate

  12. U-AVLIS feed conversion using continuous metallothermic reduction of UF4: System description and cost estimate

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this document is to present a system description and develop baseline capital and operating cost estimates for commercial facilities which produced U-Fe feedstock for AVLIS enrichment plants using the continuous fluoride reduction (CFR) process. These costs can then be used together with appropriate economic assumptions to calculate estimated unit costs to the AVLIS plant owner (or utility customer) for such conversion services. Six cases are being examined. All cases assume that the conversion services are performed by a private company at a commercial site which has an existing NRC license to possess source material and which has existing uranium processing operations. The cases differ in terms of annual production capacity and whether the new process system is installed in a new building or in an existing building on the site. The six cases are summarized here

  13. Should large Spanish municipalities be financially compensated? Costs and benefits of being a capital/central municipality [WP-IEB

    OpenAIRE

    Bosch Roca, Núria; Espasa Queralt, Marta; Montolio, Daniel

    2013-01-01

    This paper analyse the costs and benefits of being a capital or central municipality, where central costs are understood to be incurred specifically as a result of the problems large municipalities located at the centre of an urban agglomeration face and capital costs are understood to result from the presence of regional and/or central government institutions in the municipality. However, these two qualities might also be beneficial to municipalities, resulting in a direct increase in their ...

  14. Estimating the unit costs of public hospitals and primary healthcare centers.

    Science.gov (United States)

    Younis, Mustafa Z; Jaber, Samer; Mawson, Anthony R; Hartmann, Michael

    2013-01-01

    Many factors have affected the rise of health expenditures, such as high-cost medical technologies, changes in disease patterns and increasing demand for health services. All countries allocate a significant portion of resources to the health sector. In 2008, the gross domestic product of Palestine was estimated to be at $6.108bn (current price) or about $1697 per capita. Health expenditures are estimated at 15.6% of the gross domestic product, almost as much as those of Germany, Japan and other developed countries. The numbers of hospitals, hospital beds and primary healthcare centers in the country have all increased. The Ministry of Health (MOH) currently operates 27 of 76 hospitals, with a total of 3074 beds, which represent 61% of total beds of all hospitals in the Palestinian Authorities area. Also, the MOH is operating 453 of 706 Primary Health Care facilities. By 2007, about 40 000 people were employed in different sectors of the health system, with 33% employed by the MOH. This purpose of this study was to develop a financing strategy to help cover some or all of the costs involved in operating such institutions and to estimate the unit cost of primary and secondary programs and departments. A retrospective study was carried out on data from government hospitals and primary healthcare centers to identify and analyze the costs and output (patient-related services) and to estimate the unit cost of health services provided by hospitals and PHCs during the year 2008. All operating costs are assigned and allocated to the departments at MOH hospitals and primary health care centers (PPHCs) and are identified as overhead departments, intermediate-service and final-service departments. Intermediate-service departments provide procedures and services to patients in the final-service departments. The costs of the overhead departments are distributed to the intermediate-service and final-service departments through a step-down method, according to allocation

  15. Cost Estimating Handbook for Environmental Restoration

    International Nuclear Information System (INIS)

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  16. Taxes, bankruptcy costs, and capital structure in for-profit and not-for-profit hospitals.

    Science.gov (United States)

    Huang, Sean S; Yang, Jie; Carroll, Nathan

    2018-02-01

    About 60% of the US hospitals are not-for-profit and it is not clear how traditional theories of capital structure should be adapted to understand the borrowing behavior of not-for-profit hospitals. This paper identifies important determinants of capital structure taken from theories describing for-profit firms as well as prior literature on not-for-profit hospitals. We examine the differential effects these factors have on the capital structure of for-profit and not-for-profit hospitals. Specifically, we use a difference-in-differences regression framework to study how differences in leverage between for-profit and not-for-profit hospitals change in response to key explanatory variables (i.e. tax rates and bankruptcy costs). The sample in this study includes most US short-term general acute hospitals from 2000 to 2012. We find that personal and corporate income taxes and bankruptcy costs have significant and distinct effects on the capital structure of for-profit and not-for-profit hospitals. Specifically, relative to not-for-profit hospitals: (1) higher corporate income tax encourages for-profit hospitals to increase their debt usage; (2) higher personal income tax discourages for-profit hospitals to use debt; and (3) higher expected bankruptcy costs lead for-profit hospitals to use less debt. Over the past decade, the capital structure of for-profit hospitals has been more flexible as compared to that of not-for-profit hospitals. This may suggest that not-for-profit hospitals are more constrained by external financing resources. Particularly, our analysis suggests that not-for-profit hospitals operating in states with high corporate taxes but low personal income taxes may face particular challenges of borrowing funds relative to their for-profit competitors.

  17. Capital cost: pressurized water reactor plant. Commerical electric power cost studies

    International Nuclear Information System (INIS)

    1977-06-01

    The investment cost study for the 1139-MW(e) pressurized water reactor (PWR) central station power plant consists of two volumes. This volume includes in addition to the foreword and summary, the plant description and the detailed cost estimate

  18. Carbon Emission Reduction with Capital Constraint under Greening Financing and Cost Sharing Contract.

    Science.gov (United States)

    Qin, Juanjuan; Zhao, Yuhui; Xia, Liangjie

    2018-04-13

    Motivated by the industrial practices, this work explores the carbon emission reductions for the manufacturer, while taking into account the capital constraint and the cap-and-trade regulation. To alleviate the capital constraint, two contracts are analyzed: greening financing and cost sharing. We use the Stackelberg game to model four cases as follows: (1) in Case A1, the manufacturer has no greening financing and no cost sharing; (2) in Case A2, the manufacturer has greening financing, but no cost sharing; (3) in Case B1, the manufacturer has no greening financing but has cost sharing; and, (4) in Case B2, the manufacturer has greening financing and cost sharing. Then, using the backward induction method, we derive and compare the equilibrium decisions and profits of the participants in the four cases. We find that the interest rate of green finance does not always negatively affect the carbon emission reduction of the manufacturer. Meanwhile, the cost sharing from the retailer does not always positively affect the carbon emission reduction of the manufacturer. When the cost sharing is low, both of the participants' profits in Case B1 (under no greening finance) are not less than that in Case B2 (under greening finance). When the cost sharing is high, both of the participants' profits in Case B1 (under no greening finance) are less than that in Case B2 (under greening finance).

  19. Carbon Emission Reduction with Capital Constraint under Greening Financing and Cost Sharing Contract

    Science.gov (United States)

    Qin, Juanjuan; Zhao, Yuhui; Xia, Liangjie

    2018-01-01

    Motivated by the industrial practices, this work explores the carbon emission reductions for the manufacturer, while taking into account the capital constraint and the cap-and-trade regulation. To alleviate the capital constraint, two contracts are analyzed: greening financing and cost sharing. We use the Stackelberg game to model four cases as follows: (1) in Case A1, the manufacturer has no greening financing and no cost sharing; (2) in Case A2, the manufacturer has greening financing, but no cost sharing; (3) in Case B1, the manufacturer has no greening financing but has cost sharing; and, (4) in Case B2, the manufacturer has greening financing and cost sharing. Then, using the backward induction method, we derive and compare the equilibrium decisions and profits of the participants in the four cases. We find that the interest rate of green finance does not always negatively affect the carbon emission reduction of the manufacturer. Meanwhile, the cost sharing from the retailer does not always positively affect the carbon emission reduction of the manufacturer. When the cost sharing is low, both of the participants’ profits in Case B1 (under no greening finance) are not less than that in Case B2 (under greening finance). When the cost sharing is high, both of the participants’ profits in Case B1 (under no greening finance) are less than that in Case B2 (under greening finance). PMID:29652859

  20. A Model for Shovel Capital Cost Estimation, Using a Hybrid Model of Multivariate Regression and Neural Networks

    Directory of Open Access Journals (Sweden)

    Abdolreza Yazdani-Chamzini

    2017-12-01

    Full Text Available Cost estimation is an essential issue in feasibility studies in civil engineering. Many different methods can be applied to modelling costs. These methods can be divided into several main groups: (1 artificial intelligence, (2 statistical methods, and (3 analytical methods. In this paper, the multivariate regression (MVR method, which is one of the most popular linear models, and the artificial neural network (ANN method, which is widely applied to solving different prediction problems with a high degree of accuracy, have been combined to provide a cost estimate model for a shovel machine. This hybrid methodology is proposed, taking the advantages of MVR and ANN models in linear and nonlinear modelling, respectively. In the proposed model, the unique advantages of the MVR model in linear modelling are used first to recognize the existing linear structure in data, and, then, the ANN for determining nonlinear patterns in preprocessed data is applied. The results with three indices indicate that the proposed model is efficient and capable of increasing the prediction accuracy.

  1. Assessing Discount Rate for a Project Financed Entirely with Equity Capital

    Directory of Open Access Journals (Sweden)

    Nicoleta Vintila

    2007-09-01

    Full Text Available Estimating discount rate for an investment project is one of the most challenging tasks incapital budgeting. In this paper we discuss different kind of models for cost of equity capital proposed infinance literature (static CAPM, conditional CAPM, APT, build-up model, focusing especially on advantagesand disadvantages of using each of them. In the final section, we estimate the discount rate fora certain project financed entirely with equity capital, using a version of build-up model.

  2. Secondary tax and its effect on the cost of capital and shareholder value of South African JSE listed companies

    Directory of Open Access Journals (Sweden)

    J. H.v.H De Wet

    2008-12-01

    Full Text Available Background: The introduction of a secondary tax on companies (STC and the lowering of the normal income tax rate in 1993 constituted a dramatic change in the tax structure of South African organisations. The original intention of these changes was to encourage organisations to re-invest profits to make use of capital investment opportunities. It was also anticipated that these tax changes would lower the cost of capital of organisations. Problem investigated: Announcements during the 2007 budget again raised questions about how the proposed changes in STC would affect the value of organisations. The impact of these tax changes has been the topic of some speculation in the absence of concrete research results to date. Purpose: The purpose of this study was to investigate the effect of these tax changes and all subsequent changes since 1993 on the cost of capital and shareholder value. Approach: A model of a hypothetical company, representing the 'average' listed South African organisation was used to determine the effect of the introduction of STC and the changes to the STC and company tax rate on the cost of capital and the value of the organisation. Findings: The study found that, contrary to expectations, the tax changes actually caused the cost of capital to go up. Overall, the combined effect of the higher cost of capital and the lower company tax rate caused the theoretical value of organisations to increase, constituting an improvement of shareholder value. Value of research: It is the first local study that endeavoured to analyse and quantify the impact of the introduction of STC and the lowering of the company tax rate on the cost of capital and the value of organisations. Conclusion: The introduction of STC in and the lowering of the company tax rate in 1993, as well as changes to these two forms of taxes since then, seem to have been justified in terms of shareholder value creation.

  3. Estimated cost of overactive bladder in Thailand.

    Science.gov (United States)

    Prasopsanti, Kriangsak; Santi-Ngamkun, Apirak; Pornprasit, Kanokwan

    2007-11-01

    To estimate the annual direct and indirect costs of overactive bladder (OAB) in indigenous Thai people aged 18 years and over in the year 2005. Economically based models using diagnostic and treatment algorithms from clinical practice guidelines and current disease prevalence data were used to estimate direct and indirect costs of OAB. Prevalence and event probability estimates were obtained from the literature, national data sets, and expert opinion. Costs were estimated from a small survey using a cost questionnaire and from unit costs of King Chulalongkorn Memorial Hospital. The annual cost of OAB in Thailand is estimated as 1.9 billion USD. It is estimated to consume 1.14% of national GDP The cost includes 0.33 billion USD for direct medical costs, 1.3 billion USD for direct, nonmedical costs and 0.29 billion USD for indirect costs of lost productivity. The largest costs category was direct treatment costs of comorbidities associated with OAB. Costs of OAB medication accountedfor 14% of the total costs ofOAB.

  4. Estimating the Costs of Preventive Interventions

    Science.gov (United States)

    Foster, E. Michael; Porter, Michele M.; Ayers, Tim S.; Kaplan, Debra L.; Sandler, Irwin

    2007-01-01

    The goal of this article is to improve the practice and reporting of cost estimates of prevention programs. It reviews the steps in estimating the costs of an intervention and the principles that should guide estimation. The authors then review prior efforts to estimate intervention costs using a sample of well-known but diverse studies. Finally,…

  5. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  6. Cost estimating for CERCLA remedial alternatives a unit cost methodology

    International Nuclear Information System (INIS)

    Brettin, R.W.; Carr, D.J.; Janke, R.J.

    1995-06-01

    The United States Environmental Protection Agency (EPA) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final, dated October 1988 (EPA 1988) requires a detailed analysis be conducted of the most promising remedial alternatives against several evaluation criteria, including cost. To complete the detailed analysis, order-of-magnitude cost estimates (having an accuracy of +50 percent to -30 percent) must be developed for each remedial alternative. This paper presents a methodology for developing cost estimates of remedial alternatives comprised of various technology and process options with a wide range of estimated contaminated media quantities. In addition, the cost estimating methodology provides flexibility for incorporating revisions to remedial alternatives and achieves the desired range of accuracy. It is important to note that the cost estimating methodology presented here was developed as a concurrent path to the development of contaminated media quantity estimates. This methodology can be initiated before contaminated media quantities are estimated. As a result, this methodology is useful in developing cost estimates for use in screening and evaluating remedial technologies and process options. However, remedial alternative cost estimates cannot be prepared without the contaminated media quantity estimates. In the conduct of the feasibility study for Operable Unit 5 at the Fernald Environmental Management Project (FEMP), fourteen remedial alternatives were retained for detailed analysis. Each remedial alternative was composed of combinations of remedial technologies and processes which were earlier determined to be best suited for addressing the media-specific contaminants found at the FEMP site, and achieving desired remedial action objectives

  7. Estimating pressurized water reactor decommissioning costs: A user's manual for the PWR Cost Estimating Computer Program (CECP) software

    International Nuclear Information System (INIS)

    Bierschbach, M.C.; Mencinsky, G.J.

    1993-10-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  8. Estimation of costs for applications of remediation technologies for the Department of Energy's Programmatic Environmental Impact Statement

    International Nuclear Information System (INIS)

    Villegas, A.J.; Hansen, R.I.; Humphreys, K.K.; Paananen, J.M.; Gildea, L.F.

    1994-01-01

    The Programmatic Environmental impact Statement (PEIS) being developed by the US Department of Energy (DOE) for environmental restoration (ER) and waste management (WM) activities expected to be carried out across the DOE's nationwide complex of facilities is assessing the impacts of removing, transporting, treating, storing, and disposing of waste from these ER and WM activities. Factors being considered include health and safety impacts to the public and to workers, impacts on the environment, costs and socio-economic impacts, and near-term and residual risk during those ER and WM operations. The purpose of this paper is to discuss the methodology developed specifically for the PEIS to estimate costs associated with the deployment and application of individual remediation technologies. These individual costs are used in developing order-of-magnitude cost estimates for the total remediation activities. Costs are developed on a per-unit-of-material-to-be-treated basis (i.e., $/m 3 ) to accommodate remediation projects of varying sizes. The primary focus of this cost-estimating effort was the development of capital and operating unit cost factors based on the amount of primary media to be removed, handled, and treated. The unit costs for individual treatment technologies were developed using information from a variety of sources, mainly from periodicals, EPA documentation, handbooks, vendor contacts, and cost models. The unit cost factors for individual technologies were adjusted to 1991 dollars

  9. Cost-estimating relationships for space programs

    Science.gov (United States)

    Mandell, Humboldt C., Jr.

    1992-01-01

    Cost-estimating relationships (CERs) are defined and discussed as they relate to the estimation of theoretical costs for space programs. The paper primarily addresses CERs based on analogous relationships between physical and performance parameters to estimate future costs. Analytical estimation principles are reviewed examining the sources of errors in cost models, and the use of CERs is shown to be affected by organizational culture. Two paradigms for cost estimation are set forth: (1) the Rand paradigm for single-culture single-system methods; and (2) the Price paradigms that incorporate a set of cultural variables. For space programs that are potentially subject to even small cultural changes, the Price paradigms are argued to be more effective. The derivation and use of accurate CERs is important for developing effective cost models to analyze the potential of a given space program.

  10. U-AVLIS feed conversion using continuous metallothermic reduction of UF{sub 4}: System description and cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The purpose of this document is to present a system description and develop baseline capital and operating cost estimates for commercial facilities which produced U-Fe feedstock for AVLIS enrichment plants using the continuous fluoride reduction (CFR) process. These costs can then be used together with appropriate economic assumptions to calculate estimated unit costs to the AVLIS plant owner (or utility customer) for such conversion services. Six cases are being examined. All cases assume that the conversion services are performed by a private company at a commercial site which has an existing NRC license to possess source material and which has existing uranium processing operations. The cases differ in terms of annual production capacity and whether the new process system is installed in a new building or in an existing building on the site. The six cases are summarized here.

  11. Cost-estimating for commercial digital printing

    Science.gov (United States)

    Keif, Malcolm G.

    2007-01-01

    The purpose of this study is to document current cost-estimating practices used in commercial digital printing. A research study was conducted to determine the use of cost-estimating in commercial digital printing companies. This study answers the questions: 1) What methods are currently being used to estimate digital printing? 2) What is the relationship between estimating and pricing digital printing? 3) To what extent, if at all, do digital printers use full-absorption, all-inclusive hourly rates for estimating? Three different digital printing models were identified: 1) Traditional print providers, who supplement their offset presswork with digital printing for short-run color and versioned commercial print; 2) "Low-touch" print providers, who leverage the power of the Internet to streamline business transactions with digital storefronts; 3) Marketing solutions providers, who see printing less as a discrete manufacturing process and more as a component of a complete marketing campaign. Each model approaches estimating differently. Understanding and predicting costs can be extremely beneficial. Establishing a reliable system to estimate those costs can be somewhat challenging though. Unquestionably, cost-estimating digital printing will increase in relevance in the years ahead, as margins tighten and cost knowledge becomes increasingly more critical.

  12. An evaluation of airline beta values and their application in calculating the cost of equity capital.

    OpenAIRE

    Turner, Sheelah; Morrell, Peter

    2003-01-01

    This paper focuses on the calculation of the cost of equity capital in a sample of airlines, in comparison to industry-calculated values. The approach usually taken is to apply the Capital Asset Pricing Model to airline stock prices and market indices. The research shows that the calculated b values are sensitive to the precise methodology and calculations used. Further, the low regression model fits indicate the Capital Asset Pricing Model may not be the most suitable model for b value calcul...

  13. Integrated cost estimation methodology to support high-performance building design

    Energy Technology Data Exchange (ETDEWEB)

    Vaidya, Prasad; Greden, Lara; Eijadi, David; McDougall, Tom [The Weidt Group, Minnetonka (United States); Cole, Ray [Axiom Engineers, Monterey (United States)

    2007-07-01

    Design teams evaluating the performance of energy conservation measures (ECMs) calculate energy savings rigorously with established modelling protocols, accounting for the interaction between various measures. However, incremental cost calculations do not have a similar rigor. Often there is no recognition of cost reductions with integrated design, nor is there assessment of cost interactions amongst measures. This lack of rigor feeds the notion that high-performance buildings cost more, creating a barrier for design teams pursuing aggressive high-performance outcomes. This study proposes an alternative integrated methodology to arrive at a lower perceived incremental cost for improved energy performance. The methodology is based on the use of energy simulations as means towards integrated design and cost estimation. Various points along the spectrum of integration are identified and characterized by the amount of design effort invested, the scheduling of effort, and relative energy performance of the resultant design. It includes a study of the interactions between building system parameters as they relate to capital costs. Several cost interactions amongst energy measures are found to be significant.The value of this approach is demonstrated with alternatives in a case study that shows the differences between perceived costs for energy measures along various points on the integration spectrum. These alternatives show design tradeoffs and identify how decisions would have been different with a standard costing approach. Areas of further research to make the methodology more robust are identified. Policy measures to encourage the integrated approach and reduce the barriers towards improved energy performance are discussed.

  14. KrF laser cost/performance model for ICF commercial applications

    International Nuclear Information System (INIS)

    Harris, D.B.; Pendergrass, J.H.

    1985-01-01

    Simple expressions suitable for use in commercial-applications plant parameter studies for the direct capital cost plus indirect field costs and for the efficiency as a function of repetition rate were developed for pure-optical-compression KrF laser fusion drivers. These simple expressions summarize estimates obtained from detailed cost-performance studies incorporating recent results of ongoing physics, design, and cost studies. Contributions of KrF laser capital charges and D and M costs to total levelized constant-dollar (1984) unit ICF power generation cost are estimated as a function of plant size and driver pulse energy using a published gain for short-wavelength lasers and representative values of plant parameters

  15. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.

    1992-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  16. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.; Heemstra, F.J.

    1993-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  17. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    An automated approach to performing and cataloging cost estimates has been developed at the Fusion Engineering Design Center (FEDC), wherein the cost estimate record is stored in the LOTUS 1-2-3 spreadsheet on an IBM personal computer. The cost estimation spreadsheet is based on the cost coefficient/cost algorithm approach and incorporates a detailed generic code of cost accounts for both tokamak and tandem mirror devices. Component design parameters (weight, surface area, etc.) and cost factors are input, and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  18. Well-founded cost estimation validated by experience

    International Nuclear Information System (INIS)

    LaGuardia, T.S.

    2005-01-01

    Full text: Reliable cost estimating is one of the most important elements of decommissioning planning. Alternative technologies may be evaluated and compared based on their efficiency and effectiveness, and measured against a baseline cost as to the feasibility and benefits derived from the technology. When the plan is complete, those cost considerations ensure that it is economically sound and practical for funding. Estimates of decommissioning costs have been performed and published by many organizations for many different applications. The results often vary because of differences in the work scope. Labor force cost, monetary considerations, oversight costs, the specific contaminated materials involved, the waste stream and peripheral costs associated with that type of waste, or applicable environmental compliance requirements. Many of these differences are unavoidable since a reasonable degree of reliability and accuracy can only be achieved by developing decommissioning cost estimates on a case-by-case site-specific basis. This paper describes the estimating methodology and process applied to develop decommissioning cost estimates. A major effort has been made to standardize these methodologies, and to understand the assumptions and bases that drive the costs. However, estimates are only as accurate as the information available from which to derive the costs. This information includes the assumptions of scope of the work, labour cost inputs, inflationary effects, and financial analyses that project these costs to year of expenditure. Attempts at comparison of estimates for two facilities of similar design and size must clearly identify the assumptions used in developing the estimate, and comparison of actual costs versus estimated costs must reflect these same assumptions. For the nuclear industry to grow, decommissioning estimating tools must improve to keep pace with changing technology, regulations and stakeholder issues. The decommissioning industry needs

  19. RISIKO INVESTASI, BID-ASK SPREAD, DAN COST OF EQUITY CAPITAL DI PASAR MODAL INDONESIA

    Directory of Open Access Journals (Sweden)

    Agus Haryono

    2017-03-01

    Full Text Available A number of studies investigated how financial information affected investment decisions. The study extendedthis line of research by examining the effect of risk, proxied by price per share, number of shareholders, numberof dealers, trading volume, accounting risk and market risk measures on the bid ask spread. Further, theresearch tried to test the relationship between bid ask spread and cost of equity capital. The samples of thisresearch were the manufacturing companies listed at Indonesian Stock Exchange which shared the dividendfor 3 years; there were 40 companies. Data analysis technique used multiple regression analysis. The results ofregression provided evidence of statistically significant effect of price per share, market value, asset size andprice variability on bid ask spread. At last, there was a positive relationship between bid ask spread and cost ofequity capital

  20. THE MARKET VALUE OF HUMAN CAPITAL: AN EMPIRICAL ANALYSIS

    Directory of Open Access Journals (Sweden)

    NEAGU OLIMPIA

    2012-12-01

    Full Text Available There is a general consensus that human capital is a major determinant of economic growth. Reflections on how human capital is related to growth can be extended by viewing on the market value of the human capital. The concept of the market value of human capital reflects the efficiency of allocation and utilisation of the human capital in the economy. To measure this efficiency the concept of the market value of human capital is explained and developed in the present paper. The aim of the paper is to introduce the concept of market value of human capital and the specific objectives are targeted to define his content, to propose a method for estimating it and to provide calculations of it for OECD countries. The concept of human capital is complex and multifaceted one, consisting of: native human capital (biological, educational capital, health capital and social skills (Neagu, 2010. Clearly, human capital is intangible, a stock that is not directly observable as physical capital. Therefore, the estimation of human capital must be constructed indirectly. The stock of human capital in economy creates economic value, expressed through the economic output per capita. In order to estimate this economic value we have to find an appropriate proxy for the human capital stock producing that value. In the purpose of our paper, we consider that the economic value of human capital can be estimated by calculating the aggregate value created by the active human capital in the economy. In this view, GDP per person employed is a relevant estimation of value created by the employed labour force. The aggregate value is created by the employed persons with different educational level. The market value of human capital is calculated by dividing the GDP per person employed to the human capital stocks active in the economy. The human capital stock depends on educational costs ( on primary, seconadry, tertiary education as a the share of GDP per capita weighted by the

  1. Reducing the cost of health care capital.

    Science.gov (United States)

    Silberman, R

    1984-08-01

    Although one may ask four financial experts their opinion on the future of the hospital capital market and receive five answers, the blatant need for financial strategic planning is evident. Clearly, the hospital or system with sound financial management will be better positioned to gain and/or maintain an edge in the competitive environment of the health care sector. The trends of the future include hospitals attempting to: Maximize the efficiency of invested capital. Use the expertise of Board members. Use alternative capital sources. Maximize rate of return on investments. Increase productivity. Adjust to changes in reimbursements. Restructure to use optimal financing for capital needs, i.e., using short-term to build up debt capacity if long-term financing is needed in the future. Take advantage of arbitrage (obtain capital and reinvest it until the funds are needed). Delay actual underwriting until funds are to be used. Better management of accounts receivable and accounts payable to avoid short-term financing for cash flow shortfalls. Use for-profit subsidiaries to obtain venture capital by issuing stock. Use product line management. Use leasing to obtain balance sheet advantages. These trends indicate a need for hospital executives to possess a thorough understanding of the capital formation process. In essence, the bottom line is that the short-term viability and long-term survival of a health care organization will greatly depend on the financial expertise of its decision-makers.

  2. Implementing a Capital Plan.

    Science.gov (United States)

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  3. Comparison of initial capital investment requirements for new domestic energy supplies: 1980 update

    International Nuclear Information System (INIS)

    Schlesinger, B.; Hay, N.E.; Wilkinson, P.

    1980-01-01

    A.G.A.'s update of its 1978 analysis comparing the initial capital investments required for several domestic sources of alternative energy (coal conversion, oil shale, unconventional natural gas, Alaskan gas, nuclear power, and solar energy) concludes that US energy-supply and utilization systems based on gaseous fuels need substantially less initial capital investment than do equivalent nuclear, coal, and solar electric systems or synthetic-liquids systems. The capital estimates include the costs of resource extraction, processing and conversion, transmission and distribution, and end-use equipment. The cost advantages shown for the three end-use applications compared - residential and small-commercial space heating, premium industrial usage, and large industrial boilers - reflect both the lower capital requirements and higher energy efficiencies of the gaseous systems

  4. NASA Software Cost Estimation Model: An Analogy Based Estimation Model

    Science.gov (United States)

    Hihn, Jairus; Juster, Leora; Menzies, Tim; Mathew, George; Johnson, James

    2015-01-01

    The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

  5. Cost analysis of light water reactor power plants

    International Nuclear Information System (INIS)

    Mooz, W.E.

    1978-06-01

    A statistical analysis is presented of the capital costs of light water reactor (LWR) electrical power plants. The objective is twofold: to determine what factors are statistically related to capital costs and to produce a methodology for estimating these costs. The analysis in the study is based on the time and cost data that are available on U.S. nuclear power plants. Out of a total of about 60 operating plants, useful capital-cost data were available on only 39 plants. In addition, construction-time data were available on about 65 plants, and data on completed construction permit applications were available for about 132 plants. The cost data were first systematically adjusted to constant dollars. Then multivariate regression analyses were performed by using independent variables consisting of various physical and locational characteristics of the plants. The dependent variables analyzed were the time required to obtain a construction permit, the construction time, and the capital cost

  6. Parametric cost estimation for space science missions

    Science.gov (United States)

    Lillie, Charles F.; Thompson, Bruce E.

    2008-07-01

    Cost estimation for space science missions is critically important in budgeting for successful missions. The process requires consideration of a number of parameters, where many of the values are only known to a limited accuracy. The results of cost estimation are not perfect, but must be calculated and compared with the estimates that the government uses for budgeting purposes. Uncertainties in the input parameters result from evolving requirements for missions that are typically the "first of a kind" with "state-of-the-art" instruments and new spacecraft and payload technologies that make it difficult to base estimates on the cost histories of previous missions. Even the cost of heritage avionics is uncertain due to parts obsolescence and the resulting redesign work. Through experience and use of industry best practices developed in participation with the Aerospace Industries Association (AIA), Northrop Grumman has developed a parametric modeling approach that can provide a reasonably accurate cost range and most probable cost for future space missions. During the initial mission phases, the approach uses mass- and powerbased cost estimating relationships (CER)'s developed with historical data from previous missions. In later mission phases, when the mission requirements are better defined, these estimates are updated with vendor's bids and "bottoms- up", "grass-roots" material and labor cost estimates based on detailed schedules and assigned tasks. In this paper we describe how we develop our CER's for parametric cost estimation and how they can be applied to estimate the costs for future space science missions like those presented to the Astronomy & Astrophysics Decadal Survey Study Committees.

  7. Estimating the cost of improving quality in electricity distribution: A parametric distance function approach

    International Nuclear Information System (INIS)

    Coelli, Tim J.; Gautier, Axel; Perelman, Sergio; Saplacan-Pop, Roxana

    2013-01-01

    The quality of electricity distribution is being more and more scrutinized by regulatory authorities, with explicit reward and penalty schemes based on quality targets having been introduced in many countries. It is then of prime importance to know the cost of improving the quality for a distribution system operator. In this paper, we focus on one dimension of quality, the continuity of supply, and we estimated the cost of preventing power outages. For that, we make use of the parametric distance function approach, assuming that outages enter in the firm production set as an input, an imperfect substitute for maintenance activities and capital investment. This allows us to identify the sources of technical inefficiency and the underlying trade-off faced by operators between quality and other inputs and costs. For this purpose, we use panel data on 92 electricity distribution units operated by ERDF (Electricité de France - Réseau Distribution) in the 2003–2005 financial years. Assuming a multi-output multi-input translog technology, we estimate that the cost of preventing one interruption is equal to 10.7€ for an average DSO. Furthermore, as one would expect, marginal quality improvements tend to be more expensive as quality itself improves. - Highlights: ► We estimate the implicit cost of outages for the main distribution company in France. ► For this purpose, we make use of a parametric distance function approach. ► Marginal quality improvements tend to be more expensive as quality itself improves. ► The cost of preventing one interruption varies from 1.8 € to 69.2 € (2005 prices). ► We estimate that, in average, it lays 33% above the regulated price of quality.

  8. The influence of size of plant upon reprocessing costs

    International Nuclear Information System (INIS)

    1978-10-01

    This paper reviews recent published estimates for capital and operating costs of reprocessing plants in an attempt to establish a relative variation of unit reprocessing costs with plant design capacity and load factor. It is concluded that capital costs follow the well established ''rule of thumb'' for chemical plants in being proportional to (design capacity)sup(2/3). Operating costs vary significantly with variation in labour costs. Unit reprocessing costs are presented as a function of plant design capacity, load factor and method of financing

  9. Demand of Insurance under the Cost-of-Capital Premium Calculation Principle

    Directory of Open Access Journals (Sweden)

    Michael Merz

    2014-06-01

    Full Text Available We study the optimal insurance design problem. This is a risk sharing problem between an insured and an insurer. The main novelty in this paper is that we study this optimization problem under a risk-adjusted premium calculation principle for the insurance cover. This risk-adjusted premium calculation principle uses the cost-of-capital approach as it is suggested (and used by the regulator and the insurance industry.

  10. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  11. Population based estimates of non-fatal injuries in the capital of Iran.

    Science.gov (United States)

    Saadat, Soheil; Mafi, Mostafa; Sharif-Alhoseini, Mahdi

    2011-07-31

    Fatal injuries are at the top of the injury pyramid; however, non-fatal injuries are quite common and impose huge medical expenses on the population. Relying on hospital data will underestimate the incidence of non-fatal injuries. The aim of this study was to estimate the annual incidence and out of pocket medical expenses of all injuries in urban population of Tehran (the capital city of Iran). Using the cluster random sampling approach, a household survey of residents of greater Tehran was performed on April 2008. At randomly selected residential locations, interviewers asked one adult person to report all injuries which have occurred during the past year for all household members, as well as the type of injury, place of occurrence, the activity, cause of accidents resulting in injuries, the amount of out of pocket medical expenses for injury, and whether they referred to hospital. This study included 2,450 households residing in Tehran during 2007-8. The annual incidence of all injuries was 188.7 (180.7-196.9), significant injuries needing any medical care was 68.8 (63.7-74.2), fractures was 19.3 (16.6 - 22.4), and injuries resulted in hospitalization was 16.7 (14.2 - 19.6) per 1000 population. The annual incidence of fatal injuries was 33 (7-96) per 100,000 Population. In children aged 15 or less, the annual incidence of all injuries was 137.2 (120.0 - 155.9), significant injuries needing any medical care was 64.2 (52.2 - 78.0), fractures was 21.8 (15.0 - 30.7), and injuries resulted in hospitalization was 6.8 (3.3 - 12.5) per 1000 population. The mean out of pocket medical expense for injuries was 19.9 USD. This population based study showed that the real incidence of non-fatal injuries in the capital of Iran is more than the formal hospital-based estimates. These injuries impose non trivial medical and indirect cost on the community. The out of pocket medical expense of non-fatal injuries to Tehran population is estimated as 27 million USD per year. Effective

  12. Cost Estimation and Control for Flight Systems

    Science.gov (United States)

    Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)

    2002-01-01

    Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

  13. Geography and the costs of urban energy infrastructure: The case of electricity and natural gas capital investments

    Science.gov (United States)

    Senyel, Muzeyyen Anil

    Investments in the urban energy infrastructure for distributing electricity and natural gas are analyzed using (1) property data measuring distribution plant value at the local/tax district level, and (2) system outputs such as sectoral numbers of customers and energy sales, input prices, company-specific characteristics such as average wages and load factor. Socio-economic and site-specific urban and geographic variables, however, often been neglected in past studies. The purpose of this research is to incorporate these site-specific characteristics of electricity and natural gas distribution into investment cost model estimations. These local characteristics include (1) socio-economic variables, such as income and wealth; (2) urban-related variables, such as density, land-use, street pattern, housing pattern; (3) geographic and environmental variables, such as soil, topography, and weather, and (4) company-specific characteristics such as average wages, and load factor. The classical output variables include residential and commercial-industrial customers and sales. In contrast to most previous research, only capital investments at the local level are considered. In addition to aggregate cost modeling, the analysis focuses on the investment costs for the system components: overhead conductors, underground conductors, conduits, poles, transformers, services, street lighting, and station equipment for electricity distribution; and mains, services, regular and industrial measurement and regulation stations for natural gas distribution. The Box-Cox, log-log and additive models are compared to determine the best fitting cost functions. The Box-Cox form turns out to be superior to the other forms at the aggregate level and for network components. However, a linear additive form provides a better fit for end-user related components. The results show that, in addition to output variables and company-specific variables, various site-specific variables are statistically

  14. Estimating the cost of a smoking employee.

    Science.gov (United States)

    Berman, Micah; Crane, Rob; Seiber, Eric; Munur, Mehmet

    2014-09-01

    We attempted to estimate the excess annual costs that a US private employer may attribute to employing an individual who smokes tobacco as compared to a non-smoking employee. Reviewing and synthesising previous literature estimating certain discrete costs associated with smoking employees, we developed a cost estimation approach that approximates the total of such costs for U.S. employers. We examined absenteeism, presenteesim, smoking breaks, healthcare costs and pension benefits for smokers. Our best estimate of the annual excess cost to employ a smoker is $5816. This estimate should be taken as a general indicator of the extent of excess costs, not as a predictive point value. Employees who smoke impose significant excess costs on private employers. The results of this study may help inform employer decisions about tobacco-related policies. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  15. Investment opportunity : the FPL low-cost solar dry kiln

    Science.gov (United States)

    George B. Harpole

    1988-01-01

    Two equations are presented that may be used to estimate a maximum investment limit and working capital requirements for the FPL low-cost solar dry kiln systems. The equations require data for drying cycle time, green lumber cost, and kiln-dried lumber costs. Results are intended to provide a preliminary estimate.

  16. Cost function estimates, scale economies and technological progress in the Turkish electricity generation sector

    International Nuclear Information System (INIS)

    Ali Akkemik, K.

    2009-01-01

    Turkish electricity sector has undergone significant institutional changes since 1984. The recent developments since 2001 including the setting up of a regulatory agency to undertake the regulation of the sector and increasing participation of private investors in the field of electricity generation are of special interest. This paper estimates cost functions and investigates the degree of scale economies, overinvestment, and technological progress in the Turkish electricity generation sector for the period 1984-2006 using long-run and short-run translog cost functions. Estimations were done for six groups of firms, public and private. The results indicate existence of scale economies throughout the period of analysis, hence declining long-run average costs. The paper finds empirical support for the Averch-Johnson effect until 2001, i.e., firms overinvested in an environment where there are excess returns to capital. But this effect was reduced largely after 2002. Technological progress deteriorated slightly from 1984-1993 to 1994-2001 but improved after 2002. Overall, the paper found that regulation of the market under the newly established regulating agency after 2002 was effective and there are potential gains from such regulation. (author)

  17. Outer planet probe cost estimates: First impressions

    Science.gov (United States)

    Niehoff, J.

    1974-01-01

    An examination was made of early estimates of outer planetary atmospheric probe cost by comparing the estimates with past planetary projects. Of particular interest is identification of project elements which are likely cost drivers for future probe missions. Data are divided into two parts: first, the description of a cost model developed by SAI for the Planetary Programs Office of NASA, and second, use of this model and its data base to evaluate estimates of probe costs. Several observations are offered in conclusion regarding the credibility of current estimates and specific areas of the outer planet probe concept most vulnerable to cost escalation.

  18. Decommissioning Cost Estimating -The ''Price'' Approach

    International Nuclear Information System (INIS)

    Manning, R.; Gilmour, J.

    2002-01-01

    Over the past 9 years UKAEA has developed a formalized approach to decommissioning cost estimating. The estimating methodology and computer-based application are known collectively as the PRICE system. At the heart of the system is a database (the knowledge base) which holds resource demand data on a comprehensive range of decommissioning activities. This data is used in conjunction with project specific information (the quantities of specific components) to produce decommissioning cost estimates. PRICE is a dynamic cost-estimating tool, which can satisfy both strategic planning and project management needs. With a relatively limited analysis a basic PRICE estimate can be produced and used for the purposes of strategic planning. This same estimate can be enhanced and improved, primarily by the improvement of detail, to support sanction expenditure proposals, and also as a tender assessment and project management tool. The paper will: describe the principles of the PRICE estimating system; report on the experiences of applying the system to a wide range of projects from contaminated car parks to nuclear reactors; provide information on the performance of the system in relation to historic estimates, tender bids, and outturn costs

  19. Rough order of magnitude cost estimate for immobilization of 50 MT of plutonium sharing existing facilities at Hanford with pit disassembly and conversion facility: alternative 11

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 50 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF). The Pit Disassembly and Conversion Facility (PDCF), which is being costed in a separate report by LANL, will also be located in the FMEF in this co-location option

  20. Dynamic Estimation on Output Elasticity of Highway Capital Stock in China

    Science.gov (United States)

    Li, W. J.; Zuo, Q. L.; Bai, Y. F.

    2017-12-01

    By using the Perpetual Inventory Method to calculate the capital stock of highway in China from 1988 to 2016, the paper builds the State Space Model based on Translog Production Function, according to the Ridge Regression and Kalman Filter Method, the dynamic estimation results of output elasticity are measured continuously and analyzed. The conclusions show that: Firstly, China’s growth speed on highway industry capital stock are divided into three stages which are respectively from 1988 to 2000, from 2001 to 2009 and from 2010 to 2016, during which shows steady growth, between which reflect rapid growth; Secondly, the output elasticity of highway capital stock, being between 0.154 and 0.248, is slightly larger than the output elasticity of human input factor, lower than the output elasticity of the technical level, shows positive effect on transport economy and rises steadily, but the output efficiency is low on the whole; Thirdly, around the year of 2010, the scale pay on highway industry begins to highlight the characteristic of increase.

  1. Depreciation cost for the capital investment of a pyroprocess facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. K.; Lee, S. H.; Ko, W. I. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    The pyroprocess produces U/TRU metal ingots using four important processes, pretreatment, electrochemical reduction, electrorefining and electrowinning, in order to recycle spent fuel. KAPF+'s capacity is shown the cost that is injected into the KAPF+. The pyroprocess unit cost is data that are essential for inputting to calculate the pyroprocess-Sodiumcooled Fast Reactor (SFR) nuclear fuel cycle cost. Moreover, since the pyroprocess facility's depreciation cost is included in the manufacturing indirect cost of the pyroprocess cost, it can become an important element for judging the pyroprocess' economic viability. Since the pyroprocess unit cost calculates the sum of the costs that are incurred each year by dividing with the total amount of U/TRU ingot produced, the pyroprocess unit cost uncertainty increases as well when the uncertainty of the costs incurred by each year increases. KAPF+, which is a commercialization facility, was set as the cost object, and the existing methods (straightline method and fixed percentage of declining-balance method) used today and the depreciation cost of the ADDM were subjected to a comparative analysis. The results are as follows. First, in case of the straight-line method that calculated the durable period as 40 years, and in case of ADDM that factored in a 5% deceleration rate, the difference in the depreciation costs of $65.26/kgHM and $119.05/kgHM resulted during the first and last years, respectively. Accordingly, it was analyzed that there is a significant difference in terms of the cost of the capital investment every year depending on the depreciation method. Secondly, since the depreciation cost is a component of the manufacturing indirect cost, it is necessary to maintain a trend that is similar to that of the direct labor cost in addition to the direct material cost.

  2. Depreciation cost for the capital investment of a pyroprocess facility

    International Nuclear Information System (INIS)

    Kim, S. K.; Lee, S. H.; Ko, W. I.

    2015-01-01

    The pyroprocess produces U/TRU metal ingots using four important processes, pretreatment, electrochemical reduction, electrorefining and electrowinning, in order to recycle spent fuel. KAPF+'s capacity is shown the cost that is injected into the KAPF+. The pyroprocess unit cost is data that are essential for inputting to calculate the pyroprocess-Sodiumcooled Fast Reactor (SFR) nuclear fuel cycle cost. Moreover, since the pyroprocess facility's depreciation cost is included in the manufacturing indirect cost of the pyroprocess cost, it can become an important element for judging the pyroprocess' economic viability. Since the pyroprocess unit cost calculates the sum of the costs that are incurred each year by dividing with the total amount of U/TRU ingot produced, the pyroprocess unit cost uncertainty increases as well when the uncertainty of the costs incurred by each year increases. KAPF+, which is a commercialization facility, was set as the cost object, and the existing methods (straightline method and fixed percentage of declining-balance method) used today and the depreciation cost of the ADDM were subjected to a comparative analysis. The results are as follows. First, in case of the straight-line method that calculated the durable period as 40 years, and in case of ADDM that factored in a 5% deceleration rate, the difference in the depreciation costs of $65.26/kgHM and $119.05/kgHM resulted during the first and last years, respectively. Accordingly, it was analyzed that there is a significant difference in terms of the cost of the capital investment every year depending on the depreciation method. Secondly, since the depreciation cost is a component of the manufacturing indirect cost, it is necessary to maintain a trend that is similar to that of the direct labor cost in addition to the direct material cost

  3. Uranium milling costs

    International Nuclear Information System (INIS)

    Coleman, R.B.

    1980-01-01

    Basic process flowsheets are reviewed for conventional milling of US ores. Capital costs are presented for various mill capacities for one of the basic processes. Operating costs are shown for various mill capacities for all of the basic process flowsheets. The number of mills using, or planning to use, a particular process is reviewed. A summary of the estimated average milling costs for all operating US mills is shown

  4. STOCK EXCHANGE LISTING INDUCES SOPHISTICATION OF CAPITAL BUDGETING

    Directory of Open Access Journals (Sweden)

    Wesley Mendes-da-Silva

    2014-08-01

    Full Text Available This article compares capital budgeting techniques employed in listed and unlisted companies in Brazil. We surveyed the Chief Financial Officers (CFOs of 398 listed companies and 300 large unlisted companies, and based on 91 respondents, the results suggest that the CFOs of listed companies tend to use less simplistic methods more often, for example: NPV and CAPM, and that CFOs of unlisted companies are less likely to estimate the cost of equity, despite being large companies. These findings indicate that stock exchange listing may require greater sophistication of the capital budgeting process.

  5. Stochastic cost estimating in repository life-cycle cost analysis

    International Nuclear Information System (INIS)

    Tzemos, S.; Dippold, D.

    1986-01-01

    The conceptual development, the design, and the final construction and operation of a nuclear repository span many decades. Given this lengthy time frame, it is quite challenging to obtain a good approximation of the repository life-cycle cost. One can deal with this challenge by using an analytic method, the method of moments, to explicitly assess the uncertainty of the estimate. A series expansion is used to approximate the uncertainty distribution of the cost estimate. In this paper, the moment methodology is derived and is illustrated through a numerical example. The range of validity of the approximation is discussed. The method of moments is compared to the traditional stochastic cost estimating methods and found to provide more and better information on cost uncertainty. The tow methods converge to identical results as the number of convolved variables increases and approaches the range where the central limit theorem is valid

  6. The sensitivity of capital services measurement : Measure all assets and the cost of capital

    NARCIS (Netherlands)

    Inklaar, R.

    The measurement of capital inputs is still a contentious issue: many choices have to be made that have potentially large effects on the resulting capital input series. This paper compares a large number of methodological choices and their impact on U.S. capital services at the industry and aggregate

  7. Towards Greater Harmonisation of Decommissioning Cost Estimates

    International Nuclear Information System (INIS)

    O'Sullivan, Patrick; ); Laraia, Michele; ); LaGuardia, Thomas S.

    2010-01-01

    The NEA Decommissioning Cost Estimation Group (DCEG), in collaboration with the IAEA Waste Technology Section and the EC Directorate-General for Energy and Transport, has recently studied cost estimation practices in 12 countries - Belgium, Canada, France, Germany, Italy, Japan, the Netherlands, Slovakia, Spain, Sweden, the United Kingdom and the United States. Its findings are to be published in an OECD/NEA report entitled Cost Estimation for Decommissioning: An International Overview of Cost Elements, Estimation Practices and Reporting Requirements. This booklet highlights the findings contained in the full report. (authors)

  8. Social Cost of Substance Abuse in Russia.

    Science.gov (United States)

    Potapchik, Elena; Popovich, Larisa

    2014-09-01

    To summarize results of studies that estimate the social costs of alcohol, tobacco, and illicit drug abuse in Russia. The purpose of these studies was to inform policymakers about the real economic burden of risky behaviors and to provide conditions for evidence-based and well-informed decision making in this area. The cost-of-illness method was applied to estimate the social cost of substance abuse. The intangible cost was not included in estimation. A prevalence-based approach was applied to estimate the tangible cost. For the estimation of direct costs, a top-down method was used. Indirect costs were estimated using two methods: the human capital and the friction cost. In 2008, the social cost of substance abuse in Russia comprised 677.2 billion rubles if the friction cost method is applied and 1965.9 billion rubles if the human capital method is used. The social cost of substance abuse is defined to the greatest extent by alcohol consumption, comprising about 45% of the economic burden. Illicit drug use comprises about 30% of the economic burden and tobacco consumption 25%. The results of economic studies demonstrated that psychoactive substances impose a considerable economic burden on society. Analysis of the substance abuse social cost pattern shows that the main losses that society bears because of these behavioral risk factors fall outside the health care system and lay in other sectors of the economy such as social care, law enforcement, and productivity losses. Copyright © 2014 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  9. A proposal for evaluation of the owner capital cost for the Brazilian electric power sector; Uma proposta de avaliacao do custo do capital proprio para o setor de energia eletrica brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Serrano, Ricardo Oliveira L.

    2003-12-01

    This work studies the owner capital cost of the brazilian electric sector, according to three methods: Comparable Accounting Earnings, that uses historical values in its measuring and Discounted Cash Flow (DCF) and the Capital Asset Pricing Model (CAPM), elaborated from the expected values. The obtained results by using the CAE method showed that the Brazilian electric sector has not been rewarded in its real necessity of maintenance and expansion. From this observation, it was considered appropriated not to take this method in the methodology presently proposed, which will be using only the single average of the CAPM and DCF models. The use of the results single average of this model presents the advantage of selecting specific characteristics of each one, and diluting the effects of occasional peak values. The owner capital cost obtained from this work was the average value of 19.73% for the studied period - 1995/2003 (17.12% for 2003), proximate to the obtained result by ANEEL - brazilian agency of electric power - for investments in energy distribution in Brazil, 17.47%, while Minardi and Sanvicente (2003) obtained 36.06% for the owner capital cost of CEMIG in 2002, specifically.

  10. Applying a private sector capitation model to the management of type 2 diabetes in the South African public sector: a cost-effectiveness analysis.

    Science.gov (United States)

    Volmink, Heinrich C; Bertram, Melanie Y; Jina, Ruxana; Wade, Alisha N; Hofman, Karen J

    2014-09-30

    Diabetes mellitus contributes substantially to the non-communicable disease burden in South Africa. The proposed National Health Insurance system provides an opportunity to consider the development of a cost-effective capitation model of care for patients with type 2 diabetes. The objective of the study was to determine the potential cost-effectiveness of adapting a private sector diabetes management programme (DMP) to the South African public sector. Cost-effectiveness analysis was undertaken with a public sector model of the DMP as the intervention and a usual practice model as the comparator. Probabilistic modelling was utilized for incremental cost-effectiveness ratio analysis with life years gained selected as the outcome. Secondary data were used to design the model while cost information was obtained from various sources, taking into account public sector billing. Modelling found an incremental cost-effectiveness ratio (ICER) of ZAR 8 356 (USD 1018) per life year gained (LYG) for the DMP against the usual practice model. This fell substantially below the Willingness-to-Pay threshold with bootstrapping analysis. Furthermore, a national implementation of the intervention could potentially result in an estimated cumulative gain of 96 997 years of life (95% CI 71 073 years - 113 994 years). Probabilistic modelling found the capitation intervention to be cost-effective, with an ICER of ZAR 8 356 (USD 1018) per LYG. Piloting the service within the public sector is recommended as an initial step, as this would provide data for more accurate economic evaluation, and would also allow for qualitative analysis of the programme.

  11. Preliminary cost estimating for the nuclear industry

    International Nuclear Information System (INIS)

    Klumpar, I.V.; Soltz, K.M.

    1985-01-01

    The nuclear industry has higher costs for personnel, equipment, construction, and engineering than conventional industry, which means that cost estimation procedures may need adjustment. The authors account for the special technical and labor requirements of the nuclear industry in making adjustments to equipment and installation cost estimations. Using illustrative examples, they show that conventional methods of preliminary cost estimation are flexible enough for application to emerging industries if their cost structure is similar to that of the process industries. If not, modifications can provide enough engineering and cost data for a statistical analysis. 9 references, 14 figures, 4 tables

  12. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  13. Software Cost-Estimation Model

    Science.gov (United States)

    Tausworthe, R. C.

    1985-01-01

    Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.

  14. Measuring Capital

    OpenAIRE

    W. Erwin Diewert

    2003-01-01

    The paper revisits Harper, Berndt and Wood (1989) and calculates Canadian reproducible capital services aggregates under alternative assumptions about the form of depreciation, the opportunity cost of capital and the treatment of capital gains. Five different models of depreciation are considered: (1) one hoss shay; (2) straight line depreciation; (3) declining balance or geometric depreciation; (4) linearly declining efficiency profiles and (5) linearly increasing maintenance profiles. The l...

  15. Impact of adopting IFRS standard on the equity cost of brazilian open capital companies / Impacto da adoção do padrão IFRS no custo de capital próprio das empresas de capital aberto no Brasil

    Directory of Open Access Journals (Sweden)

    Rafael Confetti Gatsios

    2016-08-01

    Full Text Available Purpose: This study aims to assess the impact of adopting IFRS standard on the equity cost of Brazilian open capital companies in the period of 2004-2013. Originality/gap/relevance/implications: The adoption of International Financial Reporting Standards aims to increase the quality of accounting information. Studies performed in Europe suggest that, after the adoption of the IFRS standard, there was a reduction in the equity cost of companies due to the reduction of information asymmetry and risk. Key methodological aspects: The equity cost was calculated using the capital asset pricing model (CAPM adapted to the Brazilian case. The empirical strategy was the difference analysis in differences, comparing the results of companies that voluntarily adopted the IFRS with companies that adopted IFRS after the mandatory adoption period. Summary of key results: The results indicate that the adoption of the IFRS standard does not contribute to reduce the equity cost in Brazil. Key considerations/conclusions: Suggesting that the process of adopting the international accounting standard may take more time to impact the equity cost of Brazilian open capital companies, since the impact of IFRS is not related only with the adoption, but also with its use by companies and users. Objetivo: Este trabalho se propõe a avaliar o impacto da adoção do padrão IFRS sobre o custo de capital próprio das empresas de capital aberto no Brasil. Originalidade/Lacuna/Relevância/Implicações: A adoção do padrão International Financial Reporting Standards (IFRS apresenta como objetivo o aumento da qualidade das informações contábeis. Estudos realizados para a Europa indicam que após a adoção do padrão IFRS se verificou a redução do custo de capital próprio das empresas devido a redução da assimetria de informação e do risco. Principais aspectos metodológicos: O estudo foi realizado no período de 2004 a 2013. O custo de capital próprio foi calculado

  16. 28 CFR 100.16 - Cost estimate submission.

    Science.gov (United States)

    2010-07-01

    ..., quantity, and cost. (ii) Direct labor. Provide a time-phased (e.g., monthly, quarterly) breakdown of labor... estimates. (iii) Allocable direct costs. Indicate how allocable costs are computed and applied, including... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cost estimate submission. 100.16 Section...

  17. Process-based Cost Estimation for Ramjet/Scramjet Engines

    Science.gov (United States)

    Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John

    2003-01-01

    Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

  18. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium sharing existing facilities at Hanford with MOX fuel fabrication facility: alternative 4B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium as a ceramic in an existing facility at Hanford, the Fuels and Materials Examination Facility (FMEF). The MOX Fuel Fabrication Facility (MFFF), which is being costed in a separate report, will also be located in the FMEF in this co-location option

  19. How much might human capital policies affect earnings inequalities and poverty?

    OpenAIRE

    Behrman, Jere R

    2011-01-01

    Economic inequality and poverty have persisted in Latin America despite important changes in political and policy regimes. This paper explores the relationship between various human capital programs aimed to reduced poverty and how improvements of those in poverty in the left tail of the earning income distribution are likely to reduce inequality. First it reviews some recent benefit/cost estimates for human capital intervention in LAC, suggesting some investments in which the returns appear ...

  20. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  1. Sand in the Wheels of Capitalism

    DEFF Research Database (Denmark)

    Bersem, Mario; Perotti, Enrico; von Thadden, Ernst-Ludwig

    We present a positive theory of capital market frictions that raise the cost of capital for new firms and lower the cost of capital for incumbent firms. Capital market frictions arise from a political conflict across voters who differ in two dimensions: (i) a fraction of voters owns capital......, the rest receives only lab or income; and (ii) voters have different vintages of human capital. We identify young workers as the decisive voter group, with preferences in between capitalists who favor a free capital market, and old workers, who favor restricted capital mobility. We show that capital market...... frictions do not naturally arise in a static framework, or even in a dynamic framework if capital market frictions are reversible. But if capital market frictions can be made to p ersist over time, we show that young workers favor capital market frictions as a way to smo oth income, especially if wealth...

  2. Transition to Clean Capital, Irreversible Investment and Stranded Assets

    OpenAIRE

    Rozenberg, Julie; Vogt-Schilb, Adrien; Hallegatte, Stephane

    2014-01-01

    This paper uses a Ramsey model with two types of capital to analyze the optimal transition to clean capital when polluting investment is irreversible. The cost of climate mitigation decomposes as a technical cost of using clean instead of polluting capital and a transition cost from the irreversibility of pre-existing polluting capital. With a carbon price, the transition cost can be limit...

  3. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided.

  4. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided

  5. Conservatism and the Cost of Equity Capital: a Multi-dimensional Measurement Approach

    OpenAIRE

    Gamaliel, Hendrik; Sugiri, Slamet

    2013-01-01

    Conservatism is a permanent phenomenon and issue in the accounting practice. It has beendeveloping in two forms, ex ante and ex post, measured in various ways—the accruals,valuation model, and book-to-market measures. Prior studies document inconclusive findingson the association between conservatism and the cost of equity capital. These inconsistentfindings motivate us to examine whether the various measures of conservatism have differenteffects on the relationship between conservatism and t...

  6. Los Alamos Waste Management Cost Estimation Model

    International Nuclear Information System (INIS)

    Matysiak, L.M.; Burns, M.L.

    1994-03-01

    This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs

  7. Energy efficiency and capital-energy substitutability: Evidence from four OPEC countries

    International Nuclear Information System (INIS)

    Adetutu, Morakinyo O.

    2014-01-01

    Highlights: • The analysis examines energy efficiency gains in selected OPEC countries during 1972–2010. • Capital-energy substitutability is also explored to analyze the impact of policy measures to reduce energy use. • The magnitudes of energy efficiency gains are somewhat small or modest. • Energy and capital are substitutes in some countries, but complements in others. • Climate change policies need to internalize the environmental cost of energy consumption in end-use prices. - Abstract: Rapid economic growth and development in several oil-exporting developing countries have led to increasing energy consumption and the accompanying greenhouse gas (GHG) emissions. Consequently, a good understanding of the nature and structure of energy use in developing economies is required for future energy and climate change policies. To this end, a modified translog cost function is employed in this paper to estimate energy efficiency for selected members of the Organization of the Petroleum Exporting Countries (OPEC) over the period 1972–2010. This also allows for the estimation of energy-capital substitutability, which arguably reflects the likely ease/disruption to long-term growth arising from policy measures aimed at reducing energy consumption and GHG emissions. The estimated results show that energy efficiency gains range from −14% to 13% for sampled countries. Furthermore, factor substitution elasticities suggest that energy and capital are substitutes in Algeria and Saudi Arabia, but are found to be complements in Iran and Venezuela. The insight generated by this study is that, over the last four decades, energy efficiency improvements in selected OPEC countries are modest, possibly reflecting a “subsidy effect” arising from artificially low energy prices. Thus, policy makers should take note that measures aimed at conserving energy need to internalize the environmental cost arising from energy consumption using pricing and fiscal instruments

  8. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using new facilities at the Savannah River site: alternatives 3A/5A/6A/6B/7A/9A

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in a new facility at Savannah River Site (SRS)

  9. A new look at nuclear power costs

    International Nuclear Information System (INIS)

    Krymm, R.

    1976-01-01

    The evaluation compares estimates for capital costs and fuel cycle costs so as to deduce from estimates of earlier years and from a cost situation which has altered in the meantime, trends for the future. Despite a continuing upward movement of costs, nuclear energy still has a marked advantage over other energy carriers as far as the costs are concerned. However, this alone is not enough anymore to drive nuclear development on, because, in the meantime other, non-economic, factors influence the development. (UA) [de

  10. Assuring Software Cost Estimates: Is it an Oxymoron?

    Science.gov (United States)

    Hihn, Jarius; Tregre, Grant

    2013-01-01

    The software industry repeatedly observes cost growth of well over 100% even after decades of cost estimation research and well-known best practices, so "What's the problem?" In this paper we will provide an overview of the current state oj software cost estimation best practice. We then explore whether applying some of the methods used in software assurance might improve the quality of software cost estimates. This paper especially focuses on issues associated with model calibration, estimate review, and the development and documentation of estimates as part alan integrated plan.

  11. Estimating the cost-savings associated with bundling maternal and child health interventions: a proposed methodology.

    Science.gov (United States)

    Adesina, Adebiyi; Bollinger, Lori A

    2013-01-01

    There is a pressing need to include cost data in the Lives Saved Tool (LiST). This paper proposes a method that combines data from both the WHO CHOosing Interventions that are Cost-Effective (CHOICE) database and the OneHealth Tool (OHT) to develop unit costs for delivering child and maternal health services, both alone and bundled. First, a translog cost function is estimated to calculate factor shares of personnel, consumables, other direct (variable or recurrent costs excluding personnel and consumables) and indirect (capital or investment) costs. Primary source facility level data from Kenya, Namibia, South Africa, Uganda, Zambia and Zimbabwe are utilized, with separate analyses for hospitals and health centres. Second, the resulting other-direct and indirect factor shares are applied to country unit costs from the WHO CHOICE unit cost database to calculate those portions of unit cost. Third, the remainder of the costs is calculated using default data from the OHT. Fourth, we calculate the effect of bundling services by assuming that a LiST intervention visit takes an average of 20 minutes when delivered alone but only incremental time in addition to the basic visit when delivered in a bundle. Personnel costs account for the greatest share of costs for both hospitals and health centres at 50% and 38%, respectively. The percentages differ between hospitals and health centres for consumables (21% versus 17%), other direct (7.5% versus 6.75%), and indirect (22% versus 23%) costs. Combining the other-direct and indirect factor shares with the WHO CHOICE database and the other costs from OHT provides a comprehensive cost estimate of LiST interventions. Finally, the cost of six recommended antenatal care (ANC) interventions is $69.76 when delivered alone, but $61.18 when delivered as a bundle, a savings of $8.58 (12.2%). This paper proposes a method for estimating a comprehensive cost of providing child and maternal health interventions by combining labor

  12. Capital cost models for geothermal power plants and fluid transmission systems. [GEOCOST

    Energy Technology Data Exchange (ETDEWEB)

    Schulte, S.C.

    1977-09-01

    The GEOCOST computer program is a simulation model for evaluating the economics of developing geothermal resources. The model was found to be both an accurate predictor of geothermal power production facility costs and a valid designer of such facilities. GEOCOST first designs a facility using thermodynamic optimization routines and then estimates costs for the selected design using cost models. Costs generated in this manner appear to correspond closely with detailed cost estimates made by industry planning groups. Through the use of this model, geothermal power production costs can be rapidly and accurately estimated for many alternative sites making the evaluation process much simpler yet more meaningful.

  13. Estimated generic prices of cancer medicines deemed cost-ineffective in England: a cost estimation analysis.

    Science.gov (United States)

    Hill, Andrew; Redd, Christopher; Gotham, Dzintars; Erbacher, Isabelle; Meldrum, Jonathan; Harada, Ryo

    2017-01-20

    The aim of this study was to estimate lowest possible treatment costs for four novel cancer drugs, hypothesising that generic manufacturing could significantly reduce treatment costs. This research was carried out in a non-clinical research setting using secondary data. There were no human participants in the study. Four drugs were selected for the study: bortezomib, dasatinib, everolimus and gefitinib. These medications were selected according to their clinical importance, novel pharmaceutical actions and the availability of generic price data. Target costs for treatment were to be generated for each indication for each treatment. The primary outcome measure was the target cost according to a production cost calculation algorithm. The secondary outcome measure was the target cost as the lowest available generic price; this was necessary where export data were not available to generate an estimate from our cost calculation algorithm. Other outcomes included patent expiry dates and total eligible treatment populations. Target prices were £411 per cycle for bortezomib, £9 per month for dasatinib, £852 per month for everolimus and £10 per month for gefitinib. Compared with current list prices in England, these target prices would represent reductions of 74-99.6%. Patent expiry dates were bortezomib 2014-22, dasatinib 2020-26, everolimus 2019-25 and gefitinib 2017. The total global eligible treatment population in 1 year is 769 736. Our findings demonstrate that affordable drug treatment costs are possible for novel cancer drugs, suggesting that new therapeutic options can be made available to patients and doctors worldwide. Assessing treatment cost estimations alongside cost-effectiveness evaluations is an important area of future research. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  14. The Impact of Human Capital on the Cost of Air Force Acquisition Programs

    National Research Council Canada - National Science Library

    Feuring, Jeffrey C

    2007-01-01

    .... The measure of output is the average cost overrun of Air Force contracts. A time series regression was conducted while controlling for other economic factors such as budgetary fluctuations and inflation. The results show positive effects of Human Capital on performance. Other policy implications of the study are the importance of budgetary stability, inflation predictions and the Defense Acquisition Workforce Improvement Act (DAWIA).

  15. Collider Scaling and Cost Estimation

    International Nuclear Information System (INIS)

    Palmer, R.B.

    1986-01-01

    This paper deals with collider cost and scaling. The main points of the discussion are the following ones: 1) scaling laws and cost estimation: accelerating gradient requirements, total stored RF energy considerations, peak power consideration, average power consumption; 2) cost optimization; 3) Bremsstrahlung considerations; 4) Focusing optics: conventional, laser focusing or super disruption. 13 refs

  16. Capital and Operating Cost of Small Arsenic Removal System and their Most Frequent Maintenance Problems

    Science.gov (United States)

    This presentation will first summarize the capital and operating cost of treatment systems by type and size of the systems. The treatment systems include adsorptive media (AM) systems, iron removal (IR), coagulation/filtration (CF), ion exchange (IX) systems, and point-of-use rev...

  17. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities

    International Nuclear Information System (INIS)

    Benjamin, Serge; Descures, Sylvain; Du Pasquier, Louis; Francois, Patrice; Buonarotti, Stefano; Mariotti, Giovanni; Tarakonov, Jurij; Daniska, Vladimir; Bergh, Niklas; Carroll, Simon; AaSTRoeM, Annika; Cato, Anna; De La Gardie, Fredrik; Haenggi, Hannes; Rodriguez, Jose; Laird, Alastair; Ridpath, Andy; La Guardia, Thomas; O'Sullivan, Patrick; ); Weber, Inge; )

    2017-01-01

    The cost estimation process of decommissioning nuclear facilities has continued to evolve in recent years, with a general trend towards demonstrating greater levels of detail in the estimate and more explicit consideration of uncertainties, the latter of which may have an impact on decommissioning project costs. The 2012 report on the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, a joint recommendation by the Nuclear Energy Agency (NEA), the International Atomic Energy Agency (IAEA) and the European Commission, proposes a standardised structure of cost items for decommissioning projects that can be used either directly for the production of cost estimates or for mapping of cost items for benchmarking purposes. The ISDC, however, provides only limited guidance on the treatment of uncertainty when preparing cost estimates. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities, prepared jointly by the NEA and IAEA, is intended to complement the ISDC, assisting cost estimators and reviewers in systematically addressing uncertainties in decommissioning cost estimates. Based on experiences gained in participating countries and projects, the report describes how uncertainty and risks can be analysed and incorporated in decommissioning cost estimates, while presenting the outcomes in a transparent manner

  18. Costs of regulatory compliance: categories and estimating techniques

    International Nuclear Information System (INIS)

    Schulte, S.C.; McDonald, C.L.; Wood, M.T.; Cole, R.M.; Hauschulz, K.

    1978-10-01

    Use of the categorization scheme and cost estimating approaches presented in this report can make cost estimates of regulation required compliance activities of value to policy makers. The report describes a uniform assessment framework that when used would assure that cost studies are generated on an equivalent basis. Such normalization would make comparisons of different compliance activity cost estimates more meaningful, thus enabling the relative merits of different regulatory options to be more effectively judged. The framework establishes uniform cost reporting accounts and cost estimating approaches for use in assessing the costs of complying with regulatory actions. The framework was specifically developed for use in a current study at Pacific Northwest Laboratory. However, use of the procedures for other applications is also appropriate

  19. An Analytical Cost Estimation Procedure

    National Research Council Canada - National Science Library

    Jayachandran, Toke

    1999-01-01

    Analytical procedures that can be used to do a sensitivity analysis of a cost estimate, and to perform tradeoffs to identify input values that can reduce the total cost of a project, are described in the report...

  20. Estimating boiling water reactor decommissioning costs. A user's manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    International Nuclear Information System (INIS)

    Bierschbach, M.C.

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  1. Advanced fuel cycle cost estimation model and its cost estimation results for three nuclear fuel cycles using a dynamic model in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sungki, E-mail: sgkim1@kaeri.re.kr [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Ko, Wonil [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Youn, Saerom; Gao, Ruxing [University of Science and Technology, 217 Gajungro, Yuseong-gu, Daejeon 305-350 (Korea, Republic of); Bang, Sungsig, E-mail: ssbang@kaist.ac.kr [Korea Advanced Institute of Science and Technology, Department of Business and Technology Management, 291 Deahak-ro, Yuseong-gu, Daejeon 305-701 (Korea, Republic of)

    2015-11-15

    Highlights: • The nuclear fuel cycle cost using a new cost estimation model was analyzed. • The material flows of three nuclear fuel cycle options were calculated. • The generation cost of once-through was estimated to be 66.88 mills/kW h. • The generation cost of pyro-SFR recycling was estimated to be 78.06 mills/kW h. • The reactor cost was identified as the main cost driver of pyro-SFR recycling. - Abstract: The present study analyzes advanced nuclear fuel cycle cost estimation models such as the different discount rate model and its cost estimation results. To do so, an analysis of the nuclear fuel cycle cost of three options (direct disposal (once through), PWR–MOX (Mixed OXide fuel), and Pyro-SFR (Sodium-cooled Fast Reactor)) from the viewpoint of economic sense, focusing on the cost estimation model, was conducted using a dynamic model. From an analysis of the fuel cycle cost estimation results, it was found that some cost gap exists between the traditional same discount rate model and the advanced different discount rate model. However, this gap does not change the priority of the nuclear fuel cycle option from the viewpoint of economics. In addition, the fuel cycle costs of OT (Once-Through) and Pyro-SFR recycling based on the most likely value using a probabilistic cost estimation except for reactor costs were calculated to be 8.75 mills/kW h and 8.30 mills/kW h, respectively. Namely, the Pyro-SFR recycling option was more economical than the direct disposal option. However, if the reactor cost is considered, the economic sense in the generation cost between the two options (direct disposal vs. Pyro-SFR recycling) can be changed because of the high reactor cost of an SFR.

  2. Parametric Cost Estimates for an International Competitive Edge

    International Nuclear Information System (INIS)

    Murphy, L.T.; Hickey, M.

    2006-01-01

    This paper summarizes the progress to date by CH2M HILL and the UKAEA in development of a parametric modelling capability for estimating the costs of large nuclear decommissioning projects in the United Kingdom (UK) and Europe. The ability to successfully apply parametric cost estimating techniques will be a key factor to commercial success in the UK and European multi-billion dollar waste management, decommissioning and environmental restoration markets. The most useful parametric models will be those that incorporate individual components representing major elements of work: reactor decommissioning, fuel cycle facility decommissioning, waste management facility decommissioning and environmental restoration. Models must be sufficiently robust to estimate indirect costs and overheads, permit pricing analysis and adjustment, and accommodate the intricacies of international monetary exchange, currency fluctuations and contingency. The development of a parametric cost estimating capability is also a key component in building a forward estimating strategy. The forward estimating strategy will enable the preparation of accurate and cost-effective out-year estimates, even when work scope is poorly defined or as yet indeterminate. Preparation of cost estimates for work outside the organizations current sites, for which detailed measurement is not possible and historical cost data does not exist, will also be facilitated. (authors)

  3. 75 FR 57284 - Agency Information Collection Activities: Cost Submission

    Science.gov (United States)

    2010-09-20

    ... respondents or record keepers from the collection of information (a total capital/startup costs and operations... Respondent: 1. Estimated time per Response: 50 hours. Estimated Total Annual Burden Hours: 50,000. [[Page...

  4. Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at the Savannah River site: alternatives 3B/5B/6C/6D/7B/9B

    International Nuclear Information System (INIS)

    DiSabatino, A.

    1998-01-01

    The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in an existing facility (221-F) at Savannah River Site (SRS)

  5. Estimation of optimal educational cost per medical student.

    Science.gov (United States)

    Yang, Eunbae B; Lee, Seunghee

    2009-09-01

    This study aims to estimate the optimal educational cost per medical student. A private medical college in Seoul was targeted by the study, and its 2006 learning environment and data from the 2003~2006 budget and settlement were carefully analyzed. Through interviews with 3 medical professors and 2 experts in the economics of education, the study attempted to establish the educational cost estimation model, which yields an empirically computed estimate of the optimal cost per student in medical college. The estimation model was based primarily upon the educational cost which consisted of direct educational costs (47.25%), support costs (36.44%), fixed asset purchases (11.18%) and costs for student affairs (5.14%). These results indicate that the optimal cost per student is approximately 20,367,000 won each semester; thus, training a doctor costs 162,936,000 won over 4 years. Consequently, we inferred that the tuition levels of a local medical college or professional medical graduate school cover one quarter or one-half of the per- student cost. The findings of this study do not necessarily imply an increase in medical college tuition; the estimation of the per-student cost for training to be a doctor is one matter, and the issue of who should bear this burden is another. For further study, we should consider the college type and its location for general application of the estimation method, in addition to living expenses and opportunity costs.

  6. Controlling Capital Costs in High Performance Office Buildings: A Review of Best Practices for Overcoming Cost Barriers

    Energy Technology Data Exchange (ETDEWEB)

    Pless, S.; Torcellini, P.

    2012-05-01

    This paper presents a set of 15 best practices for owners, designers, and construction teams of office buildings to reach high performance goals for energy efficiency, while maintaining a competitive budget. They are based on the recent experiences of the owner and design/build team for the Research Support Facility (RSF) on National Renewable Energy Facility's campus in Golden, CO, which show that achieving this outcome requires each key integrated team member to understand their opportunities to control capital costs.

  7. CONCEPT-5 user's manual. [Power plant costs

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, C.R. II

    1979-01-01

    The CONCEPT computer code package was developed to provide conceptual capital cost estimates for nuclear-fueled and fossil-fired power plants. Cost estimates can be made as a function of plant type, size, location, and date of initial operation. The output includes a detailed breakdown of the estimate into direct and indirect costs similar to the accounting system described in document NUS--531. Cost models are currently provided in CONCEPT 5 for single- and multiunit pressurized-water reactors, boiling-water reactors, and cost-fired plants with and without flue gas desulfurization equipment.

  8. A Pooled Mean Group Estimation of Capital Inflow and Growth in sub Saharan Africa

    Directory of Open Access Journals (Sweden)

    Chimere Okechukwu Iheonu

    2017-09-01

    Full Text Available This study empirically analysed the impact of capital inflow on growth in sub Saharan Africa employing the Pooled Mean Group estimator from the years 1985 to 2015. The study utilised Foreign Direct Investment (FDI, Official Development Assistance and Foreign Aid (ODA and Remittance (REM as indicators of capital inflow. Short run result indicates that the various forms of capital inflow do not have significant impact on growth but while FDI and REM were negatively related to growth, AID was positively related to growth. However, in the long run, FDI and AID have a positive and significant impact on growth while REM has a negative and significant impact on growth in sub Saharan Africa. The study concludes that planning and legislative lags are inferential from the insignificance of capital inflows on growth in the short run, while growth falls in the long run as a result of increase in labour’s income earned in diaspora. The study recommends that in the short run, economic policies should be tailored towards the development of technological based services while in the long run, government should create schemes for citizens in diaspora to participate in, to endear sector-specific economic activities as well as targeting FDI and AID as policy options to spur growth. Finally, specific capital inflow policy options should be employed as not all forms of capital inflow precipitates growth.

  9. Residential outage cost estimation: Hong Kong

    International Nuclear Information System (INIS)

    Woo, C.K.; Ho, T.; Shiu, A.; Cheng, Y.S.; Horowitz, I.; Wang, J.

    2014-01-01

    Hong Kong has almost perfect electricity reliability, the result of substantial investments ultimately financed by electricity consumers who may be willing to accept lower reliability in exchange for lower bills. But consumers with high outage costs are likely to reject the reliability reduction. Our ordered-logit regression analysis of the responses by 1876 households to a telephone survey conducted in June 2013 indicates that Hong Kong residents exhibit a statistically-significant preference for their existing service reliability and rate. Moreover, the average residential cost estimate for a 1-h outage is US$45 (HK$350), topping the estimates reported in 10 of the 11 studies published in the last 10 years. The policy implication is that absent additional compelling evidence, Hong Kong should not reduce its service reliability. - Highlights: • Use a contingent valuation survey to obtain residential preferences for reliability. • Use an ordered logit analysis to estimate Hong Kong's residential outage costs. • Find high outage cost estimates that imply high reliability requirements. • Conclude that sans new evidence, Hong Kong should not reduce its reliability

  10. Advanced Composite Air Frame Life Cycle Cost Estimating

    Science.gov (United States)

    2014-06-19

    the ACCA based on the cost . This cost analysis takes into account the increased performance parameters of the new airframe structure. This research...20 Advanced Composite Cargo Aircraft ( ACCA ) ..........................................................23 viii Cost Estimation...establishing the procurement strategies and life cycle cost (LCC) model cost estimations. The current LCC models do not take into account the potential cost

  11. Establishing a cost model when estimating product cost in early design phases

    OpenAIRE

    Jeppsson, Johanna; Sjöberg, Jessica

    2017-01-01

    About 75% of the total product cost is determined in the early design phase, which means that the possibilities to affect costs are relatively small when the design phase is completed. For companies, it is therefore vital to conduct reliable cost estimates in the early design phase, when selecting between different design choices. When conducting a cost estimate there are many uncertainties. The aim with this study is therefore to explore how uncertainties regarding product cost can be consid...

  12. ORCOST-2, PWR, BWR, HTGR, Fossil Fuel Power Plant Cost and Economics

    International Nuclear Information System (INIS)

    Fuller, L.C.; Myers, M.L.

    1975-01-01

    1 - Description of problem or function: ORCOST2 estimates the cost of electrical energy production from single-unit steam-electric power plants. Capital costs and operating and maintenance costs are calculated using base cost models which are included in the program for each of the following types of plants: PWR, BWR, HTGR, coal, oil, and gas. The user may select one of several input/output options for calculation of capital cost, operating and maintenance cost, levelized energy costs, fixed charge rate, annual cash flows, cumulative cash flows, and cumulative discounted cash flows. Options include the input of capital cost and/or fixed charge rate to override the normal calculations. Transmission and distribution costs are not included. Fuel costs must be input by the user. 2 - Method of solution: The code follows the guidelines of AEC Report NUS-531. A base capital-cost model and a base operating- and maintenance-cost model are selected and adjusted for desired size, location, date, etc. Costs are discounted to the year of first commercial operation and levelized to provide annual cost of electric power generation. 3 - Restrictions on the complexity of the problem: The capital cost models are of doubtful validity outside the 500 to 1500 MW(e) range

  13. Model for predicting fabric filter and ESP costs

    International Nuclear Information System (INIS)

    Hoskins, W.; Terrill, J.K.

    1992-01-01

    United Engineers and Constructors (UE and C) has developed a personal computer (PC) based program (Model) for estimating capital and operating costs of fabric filters (FFs) and electrostatic precipitators (ESPs). The program contains proprietary sizing routines for both types of particulate control devices. For the FF, it determines the number of compartments, number of bags, physical dimensions and other important information. For the ESP, it determines specific collection area (SCA), number of cells, and number of TR sets. This paper reports that the program has the capability of handling a wide range of gas flows. It adjusts construction costs for the labor productivity factors in different locations. The capital costs are considered conceptual in nature with an absolute accuracy range of ±25%. The capital and operating costs are used along with economic factors to determine present worth costs. This allows site specific side-by-side comparisons of FFs and ESPs

  14. Provision of capital for shutdown, dismantling and disposal. Cost risks and proposals for reform for a responsibility related financing

    International Nuclear Information System (INIS)

    Kuechler, Swantje; Meyer, Bettina; Wronski, Rupert

    2014-01-01

    In Germany the latest discussion on the cost of nuclear phase-out, dismantling and waste disposal has shown that the provision of capital by the concerned companies for these challenges and the actual regulations are not sufficient for a long-term financing security. The study presents a reform concept including the need of improved transparency on the provision of capital, a differentiated financial statement, the introduction of a stock under public law for insolvency protection including a financing responsibility for the companies and subsequent payments in case of cost increase, and an increase of protection in case of insolvency.

  15. Structural and performance costs of reproduction in a pure capital breeder, the Children's python Antaresia childreni.

    Science.gov (United States)

    Lourdais, Olivier; Lorioux, Sophie; DeNardo, Dale F

    2013-01-01

    Females often manage the high energy demands associated with reproduction by accumulating and storing energy in the form of fat before initiating their reproductive effort. However, fat stores cannot satisfy all reproductive resource demands, which include considerable investment of amino acids (e.g., for the production of yolk proteins or gluconeogenesis). Because capital breeders generally do not eat during reproduction, these amino acids must come from internal resources, typically muscle proteins. Although the energetic costs of reproduction have been fairly well studied, there are limited data on structural and performance costs associated with the muscle degradation required to meet amino acid demands. Thus, we examined structural changes (epaxial muscle width) and performance costs (constriction and strength) over the course of reproduction in a pure capital breeder, the children's python (Antaresia childreni). We found that both egg production (i.e., direct resource allocation) and maternal care (egg brooding) induce muscle catabolism and affect performance of the female. Although epaxial muscle loss was minimal in nonreproductive females, it reached up to 22% (in females after oviposition) and 34% (in females after brooding) of initial muscle width. Interestingly, we found that individuals with higher initial muscular condition allocated more of their muscle into reproduction. The amount of muscle loss was significantly linked to clutch mass, underscoring the role of structural protein in egg production. Egg brooding significantly increased proteolysis and epaxial loss despite no direct allocation to the offspring. Muscle loss was linked to a significant reduction in performance in postreproductive females. Overall, these results demonstrate that capital-breeding females experience dramatic costs that consume structural resources and jeopardize performance.

  16. 47 CFR 65.304 - Capital structure.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Capital structure. 65.304 Section 65.304... OF RETURN PRESCRIPTION PROCEDURES AND METHODOLOGIES Exchange Carriers § 65.304 Capital structure. The proportion of each cost of capital component in the capital structure is equal to: Proportion in the capital...

  17. Guidelines for estimating nuclear power plant decommissioning costs

    International Nuclear Information System (INIS)

    LaGuardia, T.S.; Williams, D.H.

    1989-01-01

    The objectives of the study were: (1) To develop guidelines to facilitate estimating the cost of nuclear power plant decommissioning alternatives on a plant-specific basis and to facilitate comparing estimates made by others. The guidelines are expressed in a form that could be readily adapted by technical specialists from individual utilities or by other uses. (2) To enhance the industry's credibility with decision-makes at the state and federal levels during rate/regulatory processes involving decommissioning costs. This is accomplished by providing a detailed, systematic breakdown of how decommissioning cost estimates are prepared. (3) To increase the validity, realism, and accuracy of site-specific decommissioning cost estimates. This is accomplished by pulling together the experiences and practices of several nuclear utilities and consultants in conducting past decommissioning cost estimates

  18. Cost analysis and estimating tools and techniques

    CERN Document Server

    Nussbaum, Daniel

    1990-01-01

    Changes in production processes reflect the technological advances permeat­ ing our products and services. U. S. industry is modernizing and automating. In parallel, direct labor is fading as the primary cost driver while engineering and technology related cost elements loom ever larger. Traditional, labor-based ap­ proaches to estimating costs are losing their relevance. Old methods require aug­ mentation with new estimating tools and techniques that capture the emerging environment. This volume represents one of many responses to this challenge by the cost analysis profession. The Institute of Cost Analysis (lCA) is dedicated to improving the effective­ ness of cost and price analysis and enhancing the professional competence of its members. We encourage and promote exchange of research findings and appli­ cations between the academic community and cost professionals in industry and government. The 1990 National Meeting in Los Angeles, jointly spo~sored by ICA and the National Estimating Society (NES),...

  19. The cost of Alzheimer's disease in China and re-estimation of costs worldwide.

    Science.gov (United States)

    Jia, Jianping; Wei, Cuibai; Chen, Shuoqi; Li, Fangyu; Tang, Yi; Qin, Wei; Zhao, Lina; Jin, Hongmei; Xu, Hui; Wang, Fen; Zhou, Aihong; Zuo, Xiumei; Wu, Liyong; Han, Ying; Han, Yue; Huang, Liyuan; Wang, Qi; Li, Dan; Chu, Changbiao; Shi, Lu; Gong, Min; Du, Yifeng; Zhang, Jiewen; Zhang, Junjian; Zhou, Chunkui; Lv, Jihui; Lv, Yang; Xie, Haiqun; Ji, Yong; Li, Fang; Yu, Enyan; Luo, Benyan; Wang, Yanjiang; Yang, Shanshan; Qu, Qiumin; Guo, Qihao; Liang, Furu; Zhang, Jintao; Tan, Lan; Shen, Lu; Zhang, Kunnan; Zhang, Jinbiao; Peng, Dantao; Tang, Muni; Lv, Peiyuan; Fang, Boyan; Chu, Lan; Jia, Longfei; Gauthier, Serge

    2018-04-01

    The socioeconomic costs of Alzheimer's disease (AD) in China and its impact on global economic burden remain uncertain. We collected data from 3098 patients with AD in 81 representative centers across China and estimated AD costs for individual patient and total patients in China in 2015. Based on this data, we re-estimated the worldwide costs of AD. The annual socioeconomic cost per patient was US $19,144.36, and total costs were US $167.74 billion in 2015. The annual total costs are predicted to reach US $507.49 billion in 2030 and US $1.89 trillion in 2050. Based on our results, the global estimates of costs for dementia were US $957.56 billion in 2015, and will be US $2.54 trillion in 2030, and US $9.12 trillion in 2050, much more than the predictions by the World Alzheimer Report 2015. China bears a heavy burden of AD costs, which greatly change the estimates of AD cost worldwide. Copyright © 2017 the Alzheimer's Association. Published by Elsevier Inc. All rights reserved.

  20. Defense Management: Further Analysis Needed to Identify Guam’s Public Infrastructure Requirements and Costs for DOD’s Realignment Plan

    Science.gov (United States)

    2013-12-01

    47U.S. Department of the Interior Office of Inspector General, Tax Collection Activities Government of Guam: Revitalized Tax...A-11: Planning, Budgeting, and Acquisition of Capital Assets, app . 8 (ver. 3.0 (July 2013). 62GAO-09-3SP, pp. i and 182. DOD’s Cost Estimate to...Capital Assets, app . 8 (V 3.0 July 2013). According to our cost estimating guide, a reliable cost estimate is critical to successfully 64GAO-09-3SP

  1. Estimating the costs of human space exploration

    Science.gov (United States)

    Mandell, Humboldt C., Jr.

    1994-01-01

    The plan for NASA's new exploration initiative has the following strategic themes: (1) incremental, logical evolutionary development; (2) economic viability; and (3) excellence in management. The cost estimation process is involved with all of these themes and they are completely dependent upon the engineering cost estimator for success. The purpose is to articulate the issues associated with beginning this major new government initiative, to show how NASA intends to resolve them, and finally to demonstrate the vital importance of a leadership role by the cost estimation community.

  2. CNSS plant concept, capital cost, and multi-unit station economics

    Energy Technology Data Exchange (ETDEWEB)

    1984-07-01

    United Engineers and Constructors (UE and C) and the Babcock and Wilcox Company (B and W) have performed several studies over the last eight years related to small integral pressurized water reactors. These reactors include the 365 MWt (100 MWe) Consolidated Nuclear Steam Generator (CNSG) and the 1200 MWt Consolidated Nuclear Steam System (CNSS). The studies, mostly performed under contract to the Oak Ridge National Laboratory, have led to a 1250 MWt (400 MWe) Consolidated Nuclear Steam System (CNSS) plant concept, with unique design and cost features. This report contains an update of earlier studies of the CNSS reactor and balance-of-plant concept design, capital costs, and multi-unit plant economics incorporating recent design developments, improvements, and post-TMI-2 upgrades. The economic evaluation compares the total system economic impact of a phased, three stage 400 MWe CNSS implementation program, i.e., a three-unit station, to the installation of a single 1200 MWe Pressurized Water Reactor (PWR) into a typical USA utility system.

  3. CNSS plant concept, capital cost, and multi-unit station economics

    International Nuclear Information System (INIS)

    1984-07-01

    United Engineers and Constructors (UE and C) and the Babcock and Wilcox Company (B and W) have performed several studies over the last eight years related to small integral pressurized water reactors. These reactors include the 365 MWt (100 MWe) Consolidated Nuclear Steam Generator (CNSG) and the 1200 MWt Consolidated Nuclear Steam System (CNSS). The studies, mostly performed under contract to the Oak Ridge National Laboratory, have led to a 1250 MWt (400 MWe) Consolidated Nuclear Steam System (CNSS) plant concept, with unique design and cost features. This report contains an update of earlier studies of the CNSS reactor and balance-of-plant concept design, capital costs, and multi-unit plant economics incorporating recent design developments, improvements, and post-TMI-2 upgrades. The economic evaluation compares the total system economic impact of a phased, three stage 400 MWe CNSS implementation program, i.e., a three-unit station, to the installation of a single 1200 MWe Pressurized Water Reactor (PWR) into a typical USA utility system

  4. Corporate taxation and capital accumulation

    OpenAIRE

    Stephen Bond; Jing Xing

    2010-01-01

    We present new empirical evidence that aggregate capital accumulation is strongly influenced by the user cost of capital and, in particular, by corporate tax incentives summarised in the tax-adjusted user cost. We use sectoral panel data for the USA, Japan, Australia and ten EU countries over the period 1982-2007. Our panel combines data on capital stocks, value-added and relative prices from the EU KLEMS database with measures of effective corporate tax rates from the Oxford University Centr...

  5. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  6. Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.; Cohen, S.; Ziegler, E.Z.

    1984-10-01

    This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook

  7. User's manual for levelized power generation cost using an IBM PC

    International Nuclear Information System (INIS)

    Fuller, L.C.

    1985-06-01

    Programs for the estimation of levelized electric power generation costs using the BASIC interpreter on an IBM PC are described. Procedures for light-water reactor plants and coal-fired plants include capital investment cost, operation and maintenance cost, fuel cycle cost, nuclear decommissioning cost, and levelized total generation cost

  8. Nuclear shipping and waste disposal cost estimates

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1977-11-01

    Cost estimates for the shipping of spent fuel from the reactor, shipping of waste from the reprocessing plant, and disposal of reprocessing plant wastes have been made for five reactor types. The reactors considered are the light-water reactor (LWR), the mixed-oxide-fueled light-water reactor (MOX), the Canadian deuterium-uranium reactor (CANDU), the fast breeder reactor (FBR), and the high-temperature gas-cooled reactor (HTGR). In addition to the cost estimates, this report provides details on the bases and assumptions used to develop the cost estimates

  9. Effects of a Capital Investment and a Discount Rate on the Optimal Operational Duration of an HLW Repository

    International Nuclear Information System (INIS)

    Kim, Sung Ki; Lee, Min Soo; Choi, Heui Joo; Choi, Jong Won

    2008-01-01

    This study aims to estimate the effects of a capital investment and a discount rate on the optimal operational duration of an HLW repository. According to the previous researches of the KRS(Korea Reference System) for an HLW repository, the amounts of 7,068,200 C$K and 2,636.2 MEUR are necessary to construct and operate surface and underground facilities. Since these huge costs can be a burden to some national economies, a study for a cost optimization should be performed. So we aim to drive the dominant cost driver for an optimal operational duration. A longer operational duration may be needed to dispose of more spent fuels continuously from a nuclear power plant, or to attain a retrievability of an HLW repository at a depth of 500 m below the ground level in a stable plutonic rock body. In this sense, an extended operational duration for an HLW repository affects the overall disposal costs of a repository. In this paper, only the influence of a capital investment and a discount rate was estimated from the view of optimized economics. Because these effects must be significant factors to minimize the overall disposal costs based on minimizing the sum of operational costs and capital investments

  10. Increased accuracy of cost-estimation using product configuration systems

    DEFF Research Database (Denmark)

    Rasmussen, Jeppe Bredahl; Hvam, Lars; Mortensen, Niels Henrik

    This article describes an approach for utilizing Product Configuration Systems (PCS) for quantifying project costs in project-based companies. It presents a case study demonstrating a method of quantifying costs in a way that makes it possible to configure cost- and time estimates. Piecework costs......, material costs and sub-supplier costs are used as principle cost elements and linked to structural and process elements to facilitate configuration. The cost data are used by the PCS to generate fast and accurate cost-estimates, quotations, time estimates and cost summaries. The described cost...... quantification principles have been used in a Scandinavian SME (Small and Medium-sized Enterprise) since the 90’s, but have since 2011 been adopted to be used in a configuration system. A longitudinal case study was conducted to compare cost and time-estimation accuracy before and after implementation. We...

  11. Does Access to Finance Lower Firms’ Cost of Capital? Empirical Evidence from International Manufacturing Data

    NARCIS (Netherlands)

    Lashitew, Addisu A.

    2011-01-01

    Lack of access to finance is argued to be one of the most binding constraints for firm growth. There is, however, limited empirical evidence on the relationship between access to finance and the cost of capital. This paper uses international manufacturing data to analyze the effect of access to

  12. Capital Flight from Russia

    OpenAIRE

    Prakash Loungani; Paolo Mauro

    2000-01-01

    This paper documents the scale of capital flight from Russia, compares it with that observed in other countries, and reviews policy options. The evidence from other countries suggests that capital flight can be reversed once reforms take hold. The paper argues that capital flight from Russia can only be curbed through a medium-term reform strategy aimed at improving governance and macroeconomic performance, and strengthening the banking system. Capital controls result in costly distortions an...

  13. The Sensitivity of Capital Services Measurement : Measure all assets and the cost of capital

    NARCIS (Netherlands)

    Inklaar, Robert

    2008-01-01

    The measurement of capital inputs is still a contentious issue: many choices have to be made that have potentially large effects on the resulting capital input series, some entailing differing assumptions about firm behaviour. This paper compares a large number of methodological choices and their

  14. Methodology of social and environmental external costs estimation in the Ukraine’s energy sector

    Directory of Open Access Journals (Sweden)

    Karaieva Nataliia Veniaminivna

    2016-09-01

    Full Text Available Paper objective is analysis of the external costs assessment model for the eco-social damage, and/or human capital losses caused by environmental pollution from the energy enterprises in Ukraine. Using the given method, necessary initial socio-economic parameters were defined and used for calculating the social costs of capital health losses in Ukraine due to deterioration of the environment, and due to the negative impact of energy sector on the air quality for the period 2002-2013. On the proposed technique determines the range value of social losses due to the negative impact of energy on air quality in Ukraine excluding future external costs for years 2002 – 2013 ranges from 1.6 – 4.5% of GDP, and the range of values of taking into account future costs is 2.0 – 6.2% of GDP.

  15. A parametric costing model for wave energy technology

    International Nuclear Information System (INIS)

    1992-01-01

    This document describes the philosophy and technical approach to a parametric cost model for offshore wave energy systems. Consideration is given both to existing known devices and other devices yet to be conceptualised. The report is complementary to a spreadsheet based cost estimating model. The latter permits users to derive capital cost estimates using either inherent default data or user provided data, if a particular scheme provides sufficient design definition for more accurate estimation. The model relies on design default data obtained from wave energy device designs and a set of specifically collected cost data. (author)

  16. Econometric estimation of country-specific hospital costs

    Directory of Open Access Journals (Sweden)

    Murray Christopher JL

    2003-02-01

    Full Text Available Abstract Information on the unit cost of inpatient and outpatient care is an essential element for costing, budgeting and economic-evaluation exercises. Many countries lack reliable estimates, however. WHO has recently undertaken an extensive effort to collect and collate data on the unit cost of hospitals and health centres from as many countries as possible; so far, data have been assembled from 49 countries, for various years during the period 1973–2000. The database covers a total of 2173 country-years of observations. Large gaps remain, however, particularly for developing countries. Although the long-term solution is that all countries perform their own costing studies, the question arises whether it is possible to predict unit costs for different countries in a standardized way for short-term use. The purpose of the work described in this paper, a modelling exercise, was to use the data collected across countries to predict unit costs in countries for which data are not yet available, with the appropriate uncertainty intervals. The model presented here forms part of a series of models used to estimate unit costs for the WHO-CHOICE project. The methods and the results of the model, however, may be used to predict a number of different types of country-specific unit costs, depending on the purpose of the exercise. They may be used, for instance, to estimate the costs per bed-day at different capacity levels; the "hotel" component of cost per bed-day; or unit costs net of particular components such as drugs. In addition to reporting estimates for selected countries, the paper shows that unit costs of hospitals vary within countries, sometimes by an order of magnitude. Basing cost-effectiveness studies or budgeting exercises on the results of a study of a single facility, or even a small group of facilities, is likely to be misleading.

  17. The costs and benefits of a vaccination programme for Haemophilus ...

    African Journals Online (AJOL)

    Costs were calculated by summing the estimated direct medical care costs together with the indirect costs of Hib disease. The latter were calculated by valuing human life using alternative, and conservative human capital and willingness-to-pay measures. The difference between Hib disease costs (Le. the benefits which ...

  18. 48 CFR 1631.205-10 - Cost of money.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Cost of money. 1631.205-10... AND PROCEDURES Contracts With Commercial Organizations 1631.205-10 Cost of money. For the purposes of FAR 31.205-10(b)(3), the estimated facilities capital cost of money is specifically identified if it...

  19. Capital regulation and tail risk

    NARCIS (Netherlands)

    Perotti, E.; Ratnovski, L.; Vlahu, R.

    2011-01-01

    The paper studies risk mitigation associated with capital regulation, in a context when banks may choose tail risk assets. We show that this undermines the traditional result that higher capital reduces excess risk-taking driven by limited liability. When capital raising is costly, poorly

  20. Cost Engineering Techniques and Their Applicability for Cost Estimation of Organic Rankine Cycle Systems

    Directory of Open Access Journals (Sweden)

    Sanne Lemmens

    2016-06-01

    Full Text Available The potential of organic Rankine cycle (ORC systems is acknowledged by both considerable research and development efforts and an increasing number of applications. Most research aims at improving ORC systems through technical performance optimization of various cycle architectures and working fluids. The assessment and optimization of technical feasibility is at the core of ORC development. Nonetheless, economic feasibility is often decisive when it comes down to considering practical instalments, and therefore an increasing number of publications include an estimate of the costs of the designed ORC system. Various methods are used to estimate ORC costs but the resulting values are rarely discussed with respect to accuracy and validity. The aim of this paper is to provide insight into the methods used to estimate these costs and open the discussion about the interpretation of these results. A review of cost engineering practices shows there has been a long tradition of industrial cost estimation. Several techniques have been developed, but the expected accuracy range of the best techniques used in research varies between 10% and 30%. The quality of the estimates could be improved by establishing up-to-date correlations for the ORC industry in particular. Secondly, the rapidly growing ORC cost literature is briefly reviewed. A graph summarizing the estimated ORC investment costs displays a pattern of decreasing costs for increasing power output. Knowledge on the actual costs of real ORC modules and projects remains scarce. Finally, the investment costs of a known heat recovery ORC system are discussed and the methodologies and accuracies of several approaches are demonstrated using this case as benchmark. The best results are obtained with factorial estimation techniques such as the module costing technique, but the accuracies may diverge by up to +30%. Development of correlations and multiplication factors for ORC technology in particular is

  1. Allocation of Federal Airport and Airway Costs for FY 1985.

    Science.gov (United States)

    1986-12-01

    functions in order to provide complete estimates of long-run marginal costs: o Depreciation , o The cost of capital, o The cost of non-labor inputs used to...accepted accounting principles ( GAAP )1 0 and normal business practice. While many R&D projects appear to be related to actual hardware development... depreciation are not. 3 An estimate was developed of the expected number of units of service consumed by each user group per flight. The estimated

  2. Bus Lifecycle Cost Model for Federal Land Management Agencies.

    Science.gov (United States)

    2011-09-30

    The Bus Lifecycle Cost Model is a spreadsheet-based planning tool that estimates capital, operating, and maintenance costs for various bus types over the full lifecycle of the vehicle. The model is based on a number of operating characteristics, incl...

  3. Development of computer program for estimating decommissioning cost - 59037

    International Nuclear Information System (INIS)

    Kim, Hak-Soo; Park, Jong-Kil

    2012-01-01

    The programs for estimating the decommissioning cost have been developed for many different purposes and applications. The estimation of decommissioning cost is required a large amount of data such as unit cost factors, plant area and its inventory, waste treatment, etc. These make it difficult to use manual calculation or typical spreadsheet software such as Microsoft Excel. The cost estimation for eventual decommissioning of nuclear power plants is a prerequisite for safe, timely and cost-effective decommissioning. To estimate the decommissioning cost more accurately and systematically, KHNP, Korea Hydro and Nuclear Power Co. Ltd, developed a decommissioning cost estimating computer program called 'DeCAT-Pro', which is Decommission-ing Cost Assessment Tool - Professional. (Hereinafter called 'DeCAT') This program allows users to easily assess the decommissioning cost with various decommissioning options. Also, this program provides detailed reporting for decommissioning funding requirements as well as providing detail project schedules, cash-flow, staffing plan and levels, and waste volumes by waste classifications and types. KHNP is planning to implement functions for estimating the plant inventory using 3-D technology and for classifying the conditions of radwaste disposal and transportation automatically. (authors)

  4. Impact on the steam electric power industry of deleting Section 316(a) of the Clean Water Act: Capital costs

    International Nuclear Information System (INIS)

    Veil, J.A.

    1993-01-01

    Many power plants discharge large volumes of cooling water. In some cases, the temperature of the discharge exceeds state thermal requirements. Section 316(a) of the Clean Water Act (CWA) allows a thermal discharger to demonstrate that less stringent thermal effluent limitations would still protect aquatic life. About 32% of total US steam electric generating capacity operates under Section 316(a) variances. In 1991, the US Senate proposed legislation that would delete Section 316(a) from the CWA. This study, presented in two companion reports, examines how this legislation would affect the steam electric power industry. This report describes alternatives available to nuclear and coal-fired plants currently operating under variances. Data from 38 plants representing 14 companies are used to estimate the national cost of implementing such alternatives. Although there are other alternatives, most affected plants would be retrofitted with cooling towers. Assuming that all plants currently operating under variances would install cooling towers, the national capital cost estimate for these retrofits ranges from $22.7 billion to $24.4 billion (in 1992 dollars). The second report quantitatively and qualitatively evaluates the energy and environmental impacts of deleting the variance. Little justification has been found for removing the Section 316(a) variance from the CWA

  5. User's manual for levelized power generation cost using a microcomputer

    International Nuclear Information System (INIS)

    Fuller, L.C.

    1984-08-01

    Microcomputer programs for the estimation of levelized electrical power generation costs are described. Procedures for light-water reactor plants and coal-fired plants include capital investment cost, operation and maintenance cost, fuel cycle cost, nuclear decommissioning cost, and levelized total generation cost. Programs are written in Pascal and are run on an Apple II Plus microcomputer

  6. Sustentabilidade empresarial e o impacto no custo de capital próprio das empresas de capital aberto Sustainable development and consequences for equity costs in public companies

    Directory of Open Access Journals (Sweden)

    Lílian Simone Aguiar da Silva

    2006-12-01

    Full Text Available Este trabalho apresenta o impacto no custo de capital próprio para as empresas brasileiras de capital aberto face à adoção dos princípios de sustentabilidade. O conceito de desenvolvimento sustentável tem se aprimorado num processo contínuo de reavaliação da relação existente entre: crescimento econômico, a sociedade civil e o meio ambiente. O triple-bottom-line das dimensões econômica, ambiental e social da sustentabilidade tem emergido como um modelo de interpretação pelas empresas, embora cada uma dessas dimensões represente um grande desafio. O segmento corporativo vem atendendo às demandas cada vez maiores da sociedade frente a essas questões, ficando a dúvida quanto à legitimidade dessas ações e o questionamento relativo ao papel das empresas na economia e na sociedade. Para avaliar o impacto no custo de capital próprio, foi implementado um modelo de decomposição do beta em medidas contábeis de risco, incluindo uma variável referente à sustentabilidade. O resultado confirma a expectativa de que ao aderir aos padrões de sustentabilidade a empresa reduz o risco corporativo medido pelo risco sistemático, determinando a redução do custo de capital e aumento do valor econômico.This article provides an analysis of equity costs in Brazilian public companies regarding the adoption of sustainability principles. The concept of sustainable development has evolved considering the relation among economic growth, the society and the environment. The triple-bottom-line of economic, environmental, and social dimensions has emerged as an interpretation model by companies, although each of these dimensions may present a challenge. The corporate sector has faced an increasing demand from society regarding these sustainability concepts, though the actions and the role to be played by companies within this context are still being questioned. Equity costs were analyzed by a multivariate regression of beta on accounting measures

  7. Capital and Operating Costs of Full-Scale Fecal Sludge Management and Wastewater Treatment Systems in Dakar, Senegal

    Science.gov (United States)

    2012-01-01

    A financial comparison of a parallel sewer based (SB) system with activated sludge, and a fecal sludge management (FSM) system with onsite septic tanks, collection and transport (C&T) trucks, and drying beds was conducted. The annualized capital for the SB ($42.66 capita–1 year–1) was ten times higher than the FSM ($4.05 capita–1 year–1), the annual operating cost for the SB ($11.98 capita–1 year–1) was 1.5 times higher than the FSM ($7.58 capita–1 year–1), and the combined capital and operating for the SB ($54.64 capita–1 year–1) was five times higher than FSM ($11.63 capita–1 year–1). In Dakar, costs for SB are almost entirely borne by the sanitation utility, with only 6% of the annualized cost borne by users of the system. In addition to costing less overall, FSM operates with a different business model, with costs spread among households, private companies, and the utility. Hence, SB was 40 times more expensive to implement for the utility than FSM. However, the majority of FSM costs are borne at the household level and are inequitable. The results of the study illustrate that in low-income countries, vast improvements in sanitation can be affordable when employing FSM, whereas SB systems are prohibitively expensive. PMID:22413875

  8. Capital and operating costs of full-scale fecal sludge management and wastewater treatment systems in Dakar, Senegal.

    Science.gov (United States)

    Dodane, Pierre-Henri; Mbéguéré, Mbaye; Sow, Ousmane; Strande, Linda

    2012-04-03

    A financial comparison of a parallel sewer based (SB) system with activated sludge, and a fecal sludge management (FSM) system with onsite septic tanks, collection and transport (C&T) trucks, and drying beds was conducted. The annualized capital for the SB ($42.66 capita(-1) year(-1)) was ten times higher than the FSM ($4.05 capita(-1) year(-1)), the annual operating cost for the SB ($11.98 capita(-1) year(-1)) was 1.5 times higher than the FSM ($7.58 capita(-1) year(-1)), and the combined capital and operating for the SB ($54.64 capita(-1) year(-1)) was five times higher than FSM ($11.63 capita(-1) year(-1)). In Dakar, costs for SB are almost entirely borne by the sanitation utility, with only 6% of the annualized cost borne by users of the system. In addition to costing less overall, FSM operates with a different business model, with costs spread among households, private companies, and the utility. Hence, SB was 40 times more expensive to implement for the utility than FSM. However, the majority of FSM costs are borne at the household level and are inequitable. The results of the study illustrate that in low-income countries, vast improvements in sanitation can be affordable when employing FSM, whereas SB systems are prohibitively expensive.

  9. AX Tank Farm waste retrieval alternatives cost estimates

    International Nuclear Information System (INIS)

    Krieg, S.A.

    1998-01-01

    This report presents the estimated costs associated with retrieval of the wastes from the four tanks in AX Tank Farm. The engineering cost estimates developed for this report are based on previous cost data prepared for Project W-320 and the HTI 241-C-106 Heel Retrieval System. The costs presented in this report address only the retrieval of the wastes from the four AX Farm tanks. This includes costs for equipment procurement, fabrication, installation, and operation to retrieve the wastes. The costs to modify the existing plant equipment and systems to support the retrieval equipment are also included. The estimates do not include operational costs associated with pumping the waste out of the waste receiver tank (241-AY-102) between AX Farm retrieval campaigns or transportation, processing, and disposal of the retrieved waste

  10. MRS/IS facility co-located with a repository: preconceptual design and life-cycle cost estimates

    International Nuclear Information System (INIS)

    Smith, R.I.; Nesbitt, J.F.

    1982-11-01

    A program is described to examine the various alternatives for monitored retrievable storage (MRS) and interim storage (IS) of spent nuclear fuel, solidified high-level waste (HLW), and transuranic (TRU) waste until appropriate geologic repository/repositories are available. The objectives of this study are: (1) to develop a preconceptual design for an MRS/IS facility that would become the principal surface facility for a deep geologic repository when the repository is opened, (2) to examine various issues such as transportation of wastes, licensing of the facility, and environmental concerns associated with operation of such a facility, and (3) to estimate the life cycle costs of the facility when operated in response to a set of scenarios which define the quantities and types of waste requiring storage in specific time periods, which generally span the years from 1990 until 2016. The life cycle costs estimated in this study include: the capital expenditures for structures, casks and/or drywells, storage areas and pads, and transfer equipment; the cost of staff labor, supplies, and services; and the incremental cost of transporting the waste materials from the site of origin to the MRS/IS facility. Three scenarios are examined to develop estimates of life cycle costs of the MRS/IS facility. In the first scenario, HLW canisters are stored, starting in 1990, until the co-located repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at various intervals. In the second scenario, spent fuel is stored, starting in 1990, because the reprocessing plants are delayed in starting operations by 10 years, but no HLW is stored because the repositories open on schedule. In the third scenario, HLW is stored, starting in 1990, because the repositories are delayed 10 years, but the reprocessing plants open on schedule

  11. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  12. Economic costs of obesity in Thailand: a retrospective cost-of-illness study.

    Science.gov (United States)

    Pitayatienanan, Paiboon; Butchon, Rukmanee; Yothasamut, Jomkwan; Aekplakorn, Wichai; Teerawattananon, Yot; Suksomboon, Naeti; Thavorncharoensap, Montarat

    2014-04-02

    Over the last decade, the prevalence of obesity (BMI ≥ 25 kg/m2) in Thailand has been rising rapidly and consistently. Estimating the cost of obesity to society is an essential step in setting priorities for research and resource use and helping improve public awareness of the negative economic impacts of obesity. This prevalence-based, cost-of-illness study aims to estimate the economic costs of obesity in Thailand. The estimated costs in this study included health care cost, cost of productivity loss due to premature mortality, and cost of productivity loss due to hospital-related absenteeism. The Obesity-Attributable Fraction (OAF) was used to estimate the extent to which the co-morbidities were attributable to obesity. The health care cost of obesity was further estimated by multiplying the number of patients in each disease category attributable to obesity by the unit cost of treatment. The cost of productivity loss was calculated using the human capital approach. The health care cost attributable to obesity was estimated at 5,584 million baht or 1.5% of national health expenditure. The cost of productivity loss attributable to obesity was estimated at 6,558 million baht - accounting for 54% of the total cost of obesity. The cost of hospital-related absenteeism was estimated at 694 million baht, while the cost of premature mortality was estimated at 5,864 million baht. The total cost of obesity was then estimated at 12,142 million baht (725.3 million US$PPP, 16.74 baht =1 US$PPP accounting for 0.13% of Thailand's Gross Domestic Product (GDP). Obesity imposes a substantial economic burden on Thai society especially in term of health care costs. Large-scale comprehensive interventions focused on improving public awareness of the cost of and problems associated with obesity and promoting a healthy lifestyle should be regarded as a public health priority.

  13. Credit Constraints and Determinants of the Cost of Capital in Vietnamese Manufacturing

    DEFF Research Database (Denmark)

    Rand, John

    2007-01-01

    This paper examines the extent to which borrowing constraints restrict firm access to credit and identifies individual, firm, and loan characteristics, which determine the cost of capital in Vietnamese manufacturing. Using direct information from a Vietnamese enterprise survey the paper shows...... to have the necessary time to go through the many administrative difficulties in the formal credit system if they want to "seize the day". Finally, collateralized loans face larger interest rates, explained by the significant influence of "policy lending" in Vietnamese credit markets...

  14. Cost Estimating Cases: Educational Tools for Cost Analysts

    Science.gov (United States)

    1993-09-01

    only appropriate documentation should be provided. In other words, students should not submit all of the documentation possible using ACEIT , only that...case was their lack of understanding of the ACEIT software used to conduct the estimate. Specifically, many students misinterpreted the cost...estimating relationships (CERs) embedded in the 49 software. Additionally, few of the students were able to properly organize the ACEIT documentation output

  15. State-Level Estimates of Cancer-Related Absenteeism Costs

    Science.gov (United States)

    Tangka, Florence K.; Trogdon, Justin G.; Nwaise, Isaac; Ekwueme, Donatus U.; Guy, Gery P.; Orenstein, Diane

    2016-01-01

    Background Cancer is one of the top five most costly diseases in the United States and leads to substantial work loss. Nevertheless, limited state-level estimates of cancer absenteeism costs have been published. Methods In analyses of data from the 2004–2008 Medical Expenditure Panel Survey, the 2004 National Nursing Home Survey, the U.S. Census Bureau for 2008, and the 2009 Current Population Survey, we used regression modeling to estimate annual state-level absenteeism costs attributable to cancer from 2004 to 2008. Results We estimated that the state-level median number of days of absenteeism per year among employed cancer patients was 6.1 days and that annual state-level cancer absenteeism costs ranged from $14.9 million to $915.9 million (median = $115.9 million) across states in 2010 dollars. Absenteeism costs are approximately 6.5% of the costs of premature cancer mortality. Conclusions The results from this study suggest that lost productivity attributable to cancer is a substantial cost to employees and employers and contributes to estimates of the overall impact of cancer in a state population. PMID:23969498

  16. Rethinking Acquisition Reform: Cost-Growth Solutions May Aggravate More Important Problems

    National Research Council Canada - National Science Library

    Candreva, Phil

    2008-01-01

    .... Several recent studies have recommended two categories of reforms: capital budgeting reforms seek stability in acquisition accounts, and rational cost model reforms seek to reduce the percentage increase of final cost over budget estimates...

  17. 48 CFR 1852.216-74 - Estimated cost and fixed fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-74 Estimated cost and fixed fee. As prescribed in 1816.307-70(b), insert the following clause: Estimated Cost and Fixed Fee (DEC 1991) The estimated cost of this contract is ______ exclusive of the fixed fee of ______. The total estimated cost and fixed fee is ______. (End of clause) [62...

  18. Strošek lastniškega kapitala podjetja: primer ocene za izbrane slovenske delniške družbe = Cost of Equity Capital: An Example of Evaluation for Selected Slovene Joint-Stock Companies

    Directory of Open Access Journals (Sweden)

    Igor Stubelj

    2009-03-01

    Full Text Available The article sheds light on the evaluation of cost of equity, which is important as it determines the minimum yield the investors require on the invested capital. We use the cost of equity as a discount rate to calculate the present value of the expected free cash flows which belongs to the owners of equity capital. In the article, the methodological solutions for the evaluation of the equity capital cost with the CAPM on the Slovene financial market are shown. The Slovene capital market is a developing market with a short time line of available historical data. We evaluate the equity capital cost for selected Slovene companies.

  19. Cost-estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R.

    1993-01-01

    Various advanced power plant concepts are currently under development. These include several advanced light water reactors as well as the modular high-temperature gas-cooled reactor and the advanced liquid-metal reactor. One measure-of the attractiveness of a new concept is cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electric generation. In order to make reasonable comparative assessments of competing technologies, consistent ground rules and assumptions must be applied when developing cost estimates. This paper describes the cost-estimate guidelines developed by Oak Ridge National Laboratory for the U.S. Department of Energy (DOE) to be used in developing cost estimates for the advanced nuclear reactors and how these guidelines relate to the DOE cost verification process

  20. Replacement energy, capacity, and reliability costs for permanent nuclear reactor shutdowns

    International Nuclear Information System (INIS)

    VanKuiken, J.C., Buehring, W.A.; Hamilton, S.; Kavicky, J.A.; Cavallo, J.D.; Veselka, T.D.; Willing, D.L.

    1993-10-01

    Average replacement power costs are estimated for potential permanent shutdowns of nuclear electricity-generating units. Replacement power costs are considered to include replacement energy, capacity, and reliability cost components. These estimates were developed to assist the US Nuclear Regulatory Commission in evaluating regulatory issues that potentially affect changes in serious reactor accident frequencies. Cost estimates were derived from long-term production-cost and capacity expansion simulations of pooled utility-system operations. Factors that affect replacement power cost, such as load growth, replacement sources of generation, and capital costs for replacement capacity, were treated in the analysis. Costs are presented for a representative reactor and for selected subcategories of reactors, based on estimates for 112 individual reactors

  1. DO FINANCIAL STATEMENTS PROVIDE ADEQUATE INFORMATION ABOUT THE CAPITALIZATION OF COSTS RELATED TO INTANGIBLE ASSETS?: AN EMPIRICAL RESEARCH ON ITALIAN LISTED COMPANIES

    Directory of Open Access Journals (Sweden)

    Stefania Vignini

    2015-11-01

    Full Text Available The aim of our research is to verify if Italian listed companies financial statements provide adequate information about the capitalization of costs related to intangible assets and if the information provided are reliable. Moreover, we investigated if they merely comply with law or provide additional information on cost capitalization and reveal if internal control systems (especially managerial accounting systems or other information systems are applied to support the measurement process and the cost control, thus guaranteeing the verifiability and representational faithfulness of the information disclosed. This paper is an empirical analysis and is concerned to investigate the financial statements of 250 Italian listed companies.

  2. Aircraft bi-level life cycle cost estimation

    NARCIS (Netherlands)

    Zhao, X.; Verhagen, W.J.C.; Curan, R.

    2015-01-01

    n an integrated aircraft design and analysis practice, Life Cycle Cost (LCC) is essential for decision making. The LCC of an aircraft is ordinarily partially estimated by emphasizing a specific cost type. However, an overview of the LCC including design and development cost, production cost,

  3. Estimating costs in the economic evaluation of medical technologies.

    Science.gov (United States)

    Luce, B R; Elixhauser, A

    1990-01-01

    The complexities and nuances of evaluating the costs associated with providing medical technologies are often underestimated by analysts engaged in economic evaluations. This article describes the theoretical underpinnings of cost estimation, emphasizing the importance of accounting for opportunity costs and marginal costs. The various types of costs that should be considered in an analysis are described; a listing of specific cost elements may provide a helpful guide to analysis. The process of identifying and estimating costs is detailed, and practical recommendations for handling the challenges of cost estimation are provided. The roles of sensitivity analysis and discounting are characterized, as are determinants of the types of costs to include in an analysis. Finally, common problems facing the analyst are enumerated with suggestions for managing these problems.

  4. Corporate Social Capital and Public Relations : Capital Accumulation by Social Relationship and Rethinking the Definition of Public Relations

    OpenAIRE

    北見, 幸一

    2009-01-01

    This paper discusses Corporate Social Capital and Public Relations. This paper overviewed the Social Capital studies, especially early studies in sociology field, proposed the framework to evaluate Social Capital in a capital. Social Capital has the merit to reduce transaction costs, and should be clearly positioned as a component of capital of corporation. Using the concept of the Corporate Social Capital, to rethink the definition of Public Relations, this paper proposed the following defin...

  5. Fuel Cell System for Transportation -- 2005 Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, D.

    2006-10-01

    Independent review report of the methodology used by TIAX to estimate the cost of producing PEM fuel cells using 2005 cell stack technology. The U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies Program Manager asked the National Renewable Energy Laboratory (NREL) to commission an independent review of the 2005 TIAX cost analysis for fuel cell production. The NREL Systems Integrator is responsible for conducting independent reviews of progress toward meeting the DOE Hydrogen Program (the Program) technical targets. An important technical target of the Program is the proton exchange membrane (PEM) fuel cell cost in terms of dollars per kilowatt ($/kW). The Program's Multi-Year Program Research, Development, and Demonstration Plan established $125/kW as the 2005 technical target. Over the last several years, the Program has contracted with TIAX, LLC (TIAX) to produce estimates of the high volume cost of PEM fuel cell production for transportation use. Since no manufacturer is yet producing PEM fuel cells in the quantities needed for an initial hydrogen-based transportation economy, these estimates are necessary for DOE to gauge progress toward meeting its targets. For a PEM fuel cell system configuration developed by Argonne National Laboratory, TIAX estimated the total cost to be $108/kW, based on assumptions of 500,000 units per year produced with 2005 cell stack technology, vertical integration of cell stack manufacturing, and balance-of-plant (BOP) components purchased from a supplier network. Furthermore, TIAX conducted a Monte Carlo analysis by varying ten key parameters over a wide range of values and estimated with 98% certainty that the mean PEM fuel cell system cost would be below DOE's 2005 target of $125/kW. NREL commissioned DJW TECHNOLOGY, LLC to form an Independent Review Team (the Team) of industry fuel cell experts and to evaluate the cost estimation process and the results reported by TIAX. The results of

  6. Development of a simple estimation tool for LMFBR construction cost

    International Nuclear Information System (INIS)

    Yoshida, Kazuo; Kinoshita, Izumi

    1999-01-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  7. Drug development costs when financial risk is measured using the Fama-French three-factor model.

    Science.gov (United States)

    Vernon, John A; Golec, Joseph H; Dimasi, Joseph A

    2010-08-01

    In a widely cited article, DiMasi, Hansen, and Grabowski (2003) estimate the average pre-tax cost of bringing a new molecular entity to market. Their base case estimate, excluding post-marketing studies, was $802 million (in $US 2000). Strikingly, almost half of this cost (or $399 million) is the cost of capital (COC) used to fund clinical development expenses to the point of FDA marketing approval. The authors used an 11% real COC computed using the capital asset pricing model (CAPM). But the CAPM is a single factor risk model, and multi-factor risk models are the current state of the art in finance. Using the Fama-French three factor model we find that the cost of drug development to be higher than the earlier estimate. Copyright (c) 2009 John Wiley & Sons, Ltd.

  8. Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Lee, Dong Gyu; Jung, Chong Hun; Lee, Kune Woo

    2006-01-01

    The estimated decommissioning cost of nuclear research reactor is calculated by applying a unit cost factor-based engineering cost calculation method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning cost of nuclear research reactor is composed of labor cost, equipment and materials cost. Labor cost of decommissioning costs in decommissioning works are calculated on the basis of working time consumed in decommissioning objects. In this paper, the unit cost factors and work difficulty factors which are needed to calculate the labor cost in estimating decommissioning cost of nuclear research reactor are derived and figured out.

  9. Using bayesian model to estimate the cost of traffic injuries in Iran in 2013.

    Science.gov (United States)

    Ainy, Elaheh; Soori, Hamid; Ganjali, Mojtaba; Bahadorimonfared, Ayad

    2017-01-01

    A significant social and economic burden inflicts by road traffic injuries (RTIs). We aimed to use Bayesian model, to present the precise method, and to estimate the cost of RTIs in Iran in 2013. In a cross-sectional study on costs resulting from traffic injuries, 846 people per road user were randomly selected and investigated during 3 months (1 st September-1 st December) in 2013. The research questionnaire was prepared based on the standard for willingness to pay (WTP) method considering perceived risks, especially in Iran. Data were collected along with four scenarios for occupants, pedestrians, vehicle drivers, and motorcyclists. Inclusion criterion was having at least high school education and being in the age range of 18-65 years old; risk perception was an important factor to the study and measured by visual tool. Samples who did not have risk perception were excluded from the study. Main outcome measure was cost estimation of traffic injuries using WTP method. Mean WTP was 2,612,050 internal rate of return (IRR) among these road users. Statistical value of life was estimated according to 20,408 death cases 402,314,106,073,648 IRR, equivalent to 13,410,470,202$ based on the dollar free market rate of 30,000 IRR (purchase power parity). In sum, injury and death cases came to 1,171,450,232,238,648 IRR equivalents to 39,048,341,074$. Moreover, in 2013, costs of traffic accident constituted 6.46% of gross national income, which was 604,300,000,000$. WTP had a significant relationship with age, middle and high income, daily payment to injury reduction, more payment to time reduction, trip mileage, private cars drivers, bus, minibus vehicles, and occupants ( P < 0.01). Costs of traffic injuries included noticeable portion of gross national income. If policy-making and resource allocation are made based on the scientific pieces of evidence, an enormous amount of capital can be saved through reducing death and injury rates.

  10. Estimating and understanding DOE waste management costs'

    International Nuclear Information System (INIS)

    Kang, J.S.; Sherick, M.J.

    1995-01-01

    This paper examines costs associated with cleaning up the US Department of Energy's (DOE's) nuclear facilities, with particular emphasis on the waste management program. Life-cycle waste management costs have been compiled and reported in the DOE Baseline Environmental Management Report (BEMR). Waste management costs are a critical issue for DOE because of the current budget constraints. The DOE sites are struggling to accomplish their environmental management objectives given funding scenarios that are well below anticipated waste management costs. Through the BEMR process, DOE has compiled complex-wide cleanup cost estimates and has begun analysis of these costs with respect to alternative waste management scenarios and policy strategies. From this analysis, DOE is attempting to identify the major cost drivers and prioritize environmental management activities to achieve maximum utilization of existing funding. This paper provides an overview of the methodology DOE has used to estimate and analyze some waste management costs, including the key data requirements and uncertainties

  11. An Overview Of Tool For Response Action Cost Estimating (TRACE)

    International Nuclear Information System (INIS)

    Ferries, S.R.; Klink, K.L.; Ostapkowicz, B.

    2012-01-01

    Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel(reg s ign) workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

  12. ACCOUNT INSTRUMENT CAPITAL BORROWED

    Directory of Open Access Journals (Sweden)

    Holt Gheorghe

    2012-03-01

    Full Text Available Setting up business capital is made from different sources and their use coordinates its policy aims, issues that affect the overall efficiency and thus differentiate companies with the same profile of activity and a similar level of capital advanced in the economic cycle. Thus financial structure, the average cost of capital used in the mechanism how the financial management of the company, of particular importance for this.

  13. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  14. Ripple effects of reform on capital financing.

    Science.gov (United States)

    Arduino, Kelly

    2014-05-01

    Healthcare leaders should inventory and quantify the capital initiatives deemed critical for success under changing business models. Key considerations in planning such initiatives are opportunity costs and potential impact on productivity. Senior leaders also should create rolling five-year estimates of expenditures in addition to a one-year budget. Approaches to paying for such initiatives include borrowing from cash reserves, partnering to share cash and other resources, and developing new revenue sources derived from the initiatives themselves.

  15. Support to LANL: Cost estimation. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOE planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors

  16. The Practice of Cost Estimation for Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    Davidova, Ivana; Desecures, Sylvain; Lexow, Thomas; Buonarroti, Stefano; Marini, Giuseppe; Pescatore, Claudio; Rehak, Ivan; Weber, Inge; ); Daniska, Vladimir; Linan, Jorge Borque; Caroll, Simon; Hedberg, Bjoern; De La Gardie, Fredrik; Haenggi, Hannes; Laguardia, Thomas S.; Ridpath, Andy

    2015-01-01

    Decommissioning of both commercial and R and D nuclear facilities is expected to increase significantly in the coming years, and the largest of such industrial decommissioning projects could command considerable budgets. Several approaches are currently being used for decommissioning cost estimations, with an international culture developing in the field. The present cost estimation practice guide was prepared in order to offer international actors specific guidance in preparing quality cost and schedule estimates to support detailed budgeting for the preparation of decommissioning plans, for the securing of funds and for decommissioning implementation. This guide is based on current practices and standards in a number of NEA member countries and aims to help consolidate the practice and process of decommissioning cost estimation so as to make it more widely understood. It offers a useful reference for the practitioner and for training programmes. The remainder of report is divided into the following chapters: - Chapter 2 covers the purpose and nature of decommissioning cost estimates, approaches to cost estimation and the major elements of a cost estimate. - Chapter 3 examines the development of the integrated schedule of the activity-dependent work scope and the determination of the project critical path. - Chapter 4 describes the attributes of a quality assurance programme applicable to cost estimation and the use and cautions of benchmarking the estimate from other estimates or actual costs. - Chapter 5 describes the pyramidal structure of the report, and the scope and content that should be included in the cost study report to ensure consistency and transparency in the estimate underpinnings. - Chapter 6 provides some observations, conclusions and recommendations on the use of this guide

  17. The Effects of Tax Avoidance, Accrual Earnings Management, Real Earnings Management, and Capital Intensity on the Cost of Equity

    Directory of Open Access Journals (Sweden)

    Amrie Firmansyah

    2018-03-01

    Full Text Available This study aims to examine the effects of tax avoidance, accrual profit management, real profit management, and capital intensity on equity costs. The population of this study is a manufacturing company listed on the Indonesia Stock Exchange which amounted to 146 companies. The sampling technique used was purposive sampling and resulted in 420 units of analysis. This type of research is quantitative causality by performing hypothesis testing analysis is done by using multiple linear regression model. The findings of this research are tax avoidance will add to the risks that must be borne by investors thus increasing uncertainty over their investment. Investors consider that accrual profit management actions are opportunistic as risk-taking actions as well as real profit management actions. While on Capital Intensity, investors assume the information on the company’s fixed assets is not useful in making investment decisions. The conclusions that can be taken are tax avoidance, accrual profit management, and earnings management real positive to the cost of equity. However, capital intensity has a negative effect.

  18. The theory of forest capital reproduction in terms of the lease

    Directory of Open Access Journals (Sweden)

    Nikolay Mikhaylovich Bol'shakov

    2011-09-01

    Full Text Available The subject of given article is the problem of forest capital renewal within a cost estimation concept which is considered from the perspective of multifunctional model of forest utilization under lease relations. Theoretical framework for development of a financing mechanism is given with regard to reforestation organized on a market base.

  19. IDC reengineering Phase 2 & 3 US industry standard cost estimate summary

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Huelskamp, Robert M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-01-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  20. 47 CFR 36.182 - Cash working capital.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Cash working capital. 36.182 Section 36.182... PROCEDURES; STANDARD PROCEDURES FOR SEPARATING TELECOMMUNICATIONS PROPERTY COSTS, REVENUES, EXPENSES, TAXES... Cash Working Capital § 36.182 Cash working capital. (a) The amount for cash working capital, if not...

  1. A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

    Science.gov (United States)

    Foreman, Veronica L.; Le Moigne, Jacqueline; de Weck, Oliver

    2016-01-01

    Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the limitations of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-theart in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority shortcomings within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities

  2. Inequality in Human Capital and Endogenous Credit Constraints.

    Science.gov (United States)

    Hai, Rong; Heckman, James J

    2017-04-01

    This paper investigates the determinants of inequality in human capital with an emphasis on the role of the credit constraints. We develop and estimate a model in which individuals face uninsured human capital risks and invest in education, acquire work experience, accumulate assets and smooth consumption. Agents can borrow from the private lending market and from government student loan programs. The private market credit limit is explicitly derived by extending the natural borrowing limit of Aiyagari (1994) to incorporate endogenous labor supply, human capital accumulation, psychic costs of working, and age. We quantify the effects of cognitive ability, noncognitive ability, parental education, and parental wealth on educational attainment, wages, and consumption. We conduct counterfactual experiments with respect to tuition subsidies and enhanced student loan limits and evaluate their effects on educational attainment and inequality. We compare the performance of our model with an influential ad hoc model in the literature with education-specific fixed loan limits. We find evidence of substantial life cycle credit constraints that affect human capital accumulation and inequality. The constrained fall into two groups: those who are permanently poor over their lifetimes and a group of well-endowed individuals with rising high levels of acquired skills who are constrained early in their life cycles. Equalizing cognitive and noncognitive ability has dramatic effects on inequality. Equalizing parental backgrounds has much weaker effects. Tuition costs have weak effects on inequality.

  3. Assessing the cost of electronic health records: a review of cost indicators.

    Science.gov (United States)

    Gallego, Ana Isabel; Gagnon, Marie-Pierre; Desmartis, Marie

    2010-11-01

    We systematically reviewed PubMed and EBSCO business, looking for cost indicators of electronic health record (EHR) implementations and their associated benefit indicators. We provide a set of the most common cost and benefit (CB) indicators used in the EHR literature, as well as an overall estimate of the CB related to EHR implementation. Overall, CB evaluation of EHR implementation showed a rapid capital-recovering process. On average, the annual benefits were 76.5% of the first-year costs and 308.6% of the annual costs. However, the initial investments were not recovered in a few studied implementations. Distinctions in reporting fixed and variable costs are suggested.

  4. Ferry Lifecycle Cost Model for Federal Land Management Agencies : User's Guide.

    Science.gov (United States)

    2011-09-30

    The Ferry Lifecycle Cost Model (model) is a spreadsheet-based sketch planning tool that estimates capital, operating, and total cost for various vessels that could be used to provide ferry service on a particular route given known service parameters....

  5. 10 CFR Appendix I to Part 504 - Procedures for the Computation of the Real Cost of Capital

    Science.gov (United States)

    2010-01-01

    ... I Appendix I to Part 504 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS EXISTING... parameters specified above are not obtainable, alternate parameters that closely correspond to those above... common equity, an alternate methodology to predict the firm's real after-tax marginal cost of capital may...

  6. LPGC, Levelized Steam Electric Power Generator Cost

    International Nuclear Information System (INIS)

    Coen, J.J.; Delene, J.G.

    1994-01-01

    1 - Description of program or function: LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generation cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized-water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor. Costs for plant having either one or two units may be obtained. 2 - Method of solution: LPGC consists of nine individual menu-driven programs controlled by a driver program, MAINPWR. The individual programs are PLANTCAP, for calculating capital investment costs; NUCLOM, for determining operation and maintenance (O and M) costs for nuclear plants; COALOM, for computing O and M costs for coal-fired plants; NFUEL, for calculating levelized fuel costs for nuclear plants; COALCOST, for determining levelized fuel costs for coal-fired plants; FCRATE, for computing the fixed charge rate on the capital investment; LEVEL, for calculating levelized power generation costs; CAPITAL, for determining capitalized cost from overnight cost; and MASSGEN, for generating, deleting, or changing fuel cycle mass balance data for use with NFUEL. LPGC has three modes of operation. In the first, each individual code can be executed independently to determine one aspect of the total

  7. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  8. 48 CFR 1852.216-85 - Estimated cost and award fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-85 Estimated cost and award fee. As prescribed in 1816.406-70(e), insert the following clause: Estimated Cost and Award Fee (SEP 1993) The estimated cost of this contract is $___. The... cost, base fee, and maximum award fee are $___. (End of clause) Alternate I (SEP 1993). As prescribed...

  9. Transport Accident Costs and the Value of Safety

    DEFF Research Database (Denmark)

    Koornstra, Matthijs; Evans, Andrew; Glansdorp, Cees

    The publication descibes a study of costs of passenger transport accident by road, rail, air and sea. It is argued that "willingness to pay" theory should be preferred to "human capital" theory in valuations of life and limb. The total costs of passenger transport accidents in the EU is estimated...... to about 165 billion ECU in 1995 year prices. Road accident costs account for more than 95% of the costs....

  10. Availability and cost of major and first-line antiepileptic drugs: a comprehensive evaluation in the capital of Madagascar.

    Science.gov (United States)

    Jost, Jeremy; Raharivelo, Adeline; Ratsimbazafy, Voa; Nizard, Mandy; Auditeau, Emilie; Newton, Charles R; Preux, Pierre-Marie

    2016-01-01

    The prevalence of epilepsy is high in Madagascar (23.5/1000), as is the treatment gap (estimated at 92 %). The health system of the country is underfunded; some AEDs are used, and the national drug policy does not encourage price regulation or the administration of generic agents. We conducted a cross-sectional study to assess the availability and cost of solid oral AED formulations in Antananarivo, capital of Madagascar. Data were gathered from all officially registered pharmacies (according to the drug agency list, updated in 2015) by means of telephone interviews lasting no more than 10 min and conducted by a native Malagasy speaker. With regard to other sources (hospitals, illicit sales) data were obtained at specific visits. The study received ethical approval from the Madagascar Ministry of Health. A total of 91 of 100 pharmacies (the nine not included were because of an inoperative phone number), two of three public hospitals, and two illegal outlets were investigated. Sodium valproate was available in 84.6 % of the pharmacies, while carbamazepine and phenobarbital were available in 68.1 % and 36.3 % of the pharmacies, respectively, but phenytoin was not available in any supply chain. There were more originator brands than generic formulations, with a higher cost (range 20.3-81.1 %, median 40.7 %) compared to the equivalent generic. The public system had only a very limited choice of AED, but offered the lowest costs. Illicit sources were more expensive by 54.3 % for carbamazepine and 62.5 % for phenobarbital. Concerning the annual cost of treatment, the average percentage of the gross national income per capita based on the purchasing power parity was 29.8 %/19.0 % (brand/generic) for sodium valproate, 16.4 %/7.3 % (brand/generic) for carbamazepine, 8.9 %/5.1 % (brand/generic) for phenobarbital. The main sources of AEDs were private pharmacies, but the stocks held were low. The financial burden was still important in the capital of Madagascar

  11. Economical efficiency estimation of the power system with an accelerator breeder

    International Nuclear Information System (INIS)

    Rublev, O.V.; Komin, A.V.

    1990-01-01

    The review deals with economical indices of nuclear power system with an accelerator breeder producing secondary nuclear fuel. Electric power cost was estimated by the method of discounted cost. Power system with accelerator breeder compares unfavourably with traditional nuclear power systems with respect to its capitalized cost

  12. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1986-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  13. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1987-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  14. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    International Nuclear Information System (INIS)

    R.E. Sweeney

    2001-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  15. Monitored Geologic Repository Life Cycle Cost Estimate Assumptions Document

    International Nuclear Information System (INIS)

    Sweeney, R.

    2000-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost estimate and schedule update incorporating information from the Viability Assessment (VA), License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  16. Problems of power plant capital demands

    International Nuclear Information System (INIS)

    Slechta, V.; Bohal, L.

    1986-01-01

    The problems are discussed of requirements for investment for power plants in Czechoslovakia. Since the construction was finished of coal-burning 110 MW power plants with six power units, specific capital cost has steadily been growing. The growth amounts to 6 to 8% per year while the principle has been observed that specific capital cost decreases with increased unit power. Attention is paid to the cost of the subcontractors of the building and technological parts of a power plant and to the development of productivity of labour. A comparison is tabulated of cost for coal-burning power plants with 100 MW and 200 MW units and for nuclear power plants with WWER-440 reactors. Steps are suggested leading to a reduction of the capital cost of nuclear power plants. It is stated that should not these steps be taken, the envisaged development of nuclear power would be unbearable for the Czechoslovak national economy. (Z.M.). 8 tabs., 3 refs

  17. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    Component design parameters (weight, surface area, etc.) and cost factors are input and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  18. A geographically resolved method to estimate levelized power plant costs with environmental externalities

    International Nuclear Information System (INIS)

    Rhodes, Joshua D.; King, Carey; Gulen, Gürcan; Olmstead, Sheila M.; Dyer, James S.; Hebner, Robert E.; Beach, Fred C.; Edgar, Thomas F.; Webber, Michael E.

    2017-01-01

    In this analysis we developed and applied a geographically-resolved method to calculate the Levelized Cost of Electricity (LCOE) of new power plants on a county-by-county basis while including estimates of some environmental externalities. We calculated the LCOE for each county of the contiguous United States for 12 power plant technologies. The minimum LCOE option for each county varies based on local conditions, capital and fuel costs, environmental externalities, and resource availability. We considered ten scenarios that vary input assumptions. We present the results in a map format to facilitate comparisons by fuel, technology, and location. For our reference analysis, which includes a cost of $62/tCO_2 for CO_2 emissions natural gas combined cycle, wind, and nuclear are most often the lowest-LCOE option. While the average cost increases when internalizing the environmental externalities (carbon and air pollutants) is small for some technologies, the local cost differences are as high as $0.62/kWh for coal (under our reference analysis). These results display format, and online tools could serve as an educational tool for stakeholders when considering which technologies might or might not be a good fit for a given locality subject to system integration considerations. - Highlights: • We propose a method to add externalities to LCOE. • We present the least cost technology for every county in the US. • The cheapest technology depends on many characteristics of that locale. • We present online tools for users to change our assumptions. • Our tools are useful in discussing the impact of policy on the cost of electricity.

  19. Contingency Cost estimation for Research reactor Decommissioning

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Hong, Yun Jeong

    2016-01-01

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors

  20. Contingency Cost estimation for Research reactor Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Hong, Yun Jeong [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors.

  1. Estimating the value of a Country's built assets: investment-based exposure modelling for global risk assessment

    Science.gov (United States)

    Daniell, James; Pomonis, Antonios; Gunasekera, Rashmin; Ishizawa, Oscar; Gaspari, Maria; Lu, Xijie; Aubrecht, Christoph; Ungar, Joachim

    2017-04-01

    In order to quantify disaster risk, there is a demand and need for determining consistent and reliable economic value of built assets at national or sub national level exposed to natural hazards. The value of the built stock in the context of a city or a country is critical for risk modelling applications as it allows for the upper bound in potential losses to be established. Under the World Bank probabilistic disaster risk assessment - Country Disaster Risk Profiles (CDRP) Program and rapid post-disaster loss analyses in CATDAT, key methodologies have been developed that quantify the asset exposure of a country. In this study, we assess the complementary methods determining value of building stock through capital investment data vs aggregated ground up values based on built area and unit cost of construction analyses. Different approaches to modelling exposure around the world, have resulted in estimated values of built assets of some countries differing by order(s) of magnitude. Using the aforementioned methodology of comparing investment data based capital stock and bottom-up unit cost of construction values per square meter of assets; a suitable range of capital stock estimates for built assets have been created. A blind test format was undertaken to compare the two types of approaches from top-down (investment) and bottom-up (construction cost per unit), In many cases, census data, demographic, engineering and construction cost data are key for bottom-up calculations from previous years. Similarly for the top-down investment approach, distributed GFCF (Gross Fixed Capital Formation) data is also required. Over the past few years, numerous studies have been undertaken through the World Bank Caribbean and Central America disaster risk assessment program adopting this methodology initially developed by Gunasekera et al. (2015). The range of values of the building stock is tested for around 15 countries. In addition, three types of costs - Reconstruction cost

  2. Cost estimating relationships for nuclear power plant operationa and maintenance

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1987-11-01

    Revised cost estimating relationships for 1987 are presented for estimating annual nonfuel operation and maintenance (O and M) costs for light-water reactor (LWR) nuclear power plants, which update guidelines published previously in 1982. The purpose of these cost estimating relationships is for use in long range planning and evaluations of the economics of nuclear energy for electric power generation. A listing of a computer program, LWROM, implementing the cost estimating relationships and written in advanced BASIC for IBM personal computers, is included

  3. Cost estimation for decommissioning: a review of current practice

    International Nuclear Information System (INIS)

    O'Sullivan, P.; Pescatore, C.

    2009-01-01

    It is now common practice for decommissioning plans and associated cost estimates to be prepared for all nuclear installations. Specific requirements are generally set out in regulations that have their basis in national legislation. These estimates are important for ensuring that the necessary funds are being collected to cover the actual costs of decommissioning the facility. The long time horizon for both amassing and disbursing these funds is a particular concern for national authorities. It is thus important to maintain a realistic estimate of the liabilities involved and to confirm the adequacy of the provisions to discharge them over time. Estimates of decommissioning costs have been performed and published by many organisations for many different purposes and applications. The results often vary because of differences in basic assumptions such as the choice of the decommissioning strategy (immediate vs. deferred), the availability of waste management pathways, the assumed end states of installations, the detailed definition of cost items, technical uncertainties, unforeseen events, the evolution of regulation and requirements. Many of these differences may be unavoidable since a reasonable degree of reliability and accuracy can only be achieved by developing decommissioning cost estimates on a case-by-case, site-specific basis. Moreover, even if considerable efforts are made to obtain reliable estimates, unforeseen events may cause estimates to go wrong. The issue of how to deal with uncertainties is therefore an important one, leading in turn to the need for risk management in terms of making adequate funding provisions. In March 2008, a questionnaire was circulated among the organisations participating in the NEA Decommissioning and Cost Estimation Group (DCEG). Information was collected on legal requirements and the responsibilities of the main parties concerned with the preparation and oversight of cost estimates, the main cost elements and associated

  4. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill

  5. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill.

  6. Estimated Annual Maintenance Costs for Educational Facilities in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea.......Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea....

  7. Capital budgeting practices in Indian companies

    Directory of Open Access Journals (Sweden)

    Roopali Batra

    2017-03-01

    Full Text Available The volatility of the global economy, changing business practices, and academic developments have created a need to re-examine Indian corporate capital budgeting practices. Our research is based on a sample of 77 Indian companies listed on the Bombay Stock Exchange. Results reveal that corporate practitioners largely follow the capital budgeting practices proposed by academic theory. Discounted cash flow techniques of net present value and internal rate of return and risk adjusted sensitivity analysis are most popular. Weighted average cost of capital as cost of capital is most favoured. Nevertheless, the theory-practice gap remains in adoption of specialised techniques of real options, modified internal rate of return (MIRR, and simulation. Non-financial criteria are also given due consideration in project selection.

  8. Estimating the opportunity costs of bed-days.

    Science.gov (United States)

    Sandmann, Frank G; Robotham, Julie V; Deeny, Sarah R; Edmunds, W John; Jit, Mark

    2018-03-01

    Opportunity costs of bed-days are fundamental to understanding the value of healthcare systems. They greatly influence burden of disease estimations and economic evaluations involving stays in healthcare facilities. However, different estimation techniques employ assumptions that differ crucially in whether to consider the value of the second-best alternative use forgone, of any available alternative use, or the value of the actually chosen alternative. Informed by economic theory, this paper provides a taxonomic framework of methodologies for estimating the opportunity costs of resources. This taxonomy is then applied to bed-days by classifying existing approaches accordingly. We highlight differences in valuation between approaches and the perspective adopted, and we use our framework to appraise the assumptions and biases underlying the standard approaches that have been widely adopted mostly unquestioned in the past, such as the conventional use of reference costs and administrative accounting data. Drawing on these findings, we present a novel approach for estimating the opportunity costs of bed-days in terms of health forgone for the second-best patient, but expressed monetarily. This alternative approach effectively re-connects to the concept of choice and explicitly considers net benefits. It is broadly applicable across settings and for other resources besides bed-days. © 2017 The Authors Health Economics published by John Wiley & Sons Ltd.

  9. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs

  10. Allocating risk capital for a brownfields redevelopment project under hydrogeological and financial uncertainty.

    Science.gov (United States)

    Yu, Soonyoung; Unger, Andre J A; Parker, Beth; Kim, Taehee

    2012-06-15

    In this study, we defined risk capital as the contingency fee or insurance premium that a brownfields redeveloper needs to set aside from the sale of each house in case they need to repurchase it at a later date because the indoor air has been detrimentally affected by subsurface contamination. The likelihood that indoor air concentrations will exceed a regulatory level subject to subsurface heterogeneity and source zone location uncertainty is simulated by a physics-based hydrogeological model using Monte Carlo realizations, yielding the probability of failure. The cost of failure is the future value of the house indexed to the stochastic US National Housing index. The risk capital is essentially the probability of failure times the cost of failure with a surcharge to compensate the developer against hydrogeological and financial uncertainty, with the surcharge acting as safety loading reflecting the developers' level of risk aversion. We review five methodologies taken from the actuarial and financial literature to price the risk capital for a highly stylized brownfield redevelopment project, with each method specifically adapted to accommodate our notion of the probability of failure. The objective of this paper is to develop an actuarially consistent approach for combining the hydrogeological and financial uncertainty into a contingency fee that the brownfields developer should reserve (i.e. the risk capital) in order to hedge their risk exposure during the project. Results indicate that the price of the risk capital is much more sensitive to hydrogeological rather than financial uncertainty. We use the Capital Asset Pricing Model to estimate the risk-adjusted discount rate to depreciate all costs to present value for the brownfield redevelopment project. A key outcome of this work is that the presentation of our risk capital valuation methodology is sufficiently generalized for application to a wide variety of engineering projects. Copyright © 2012 Elsevier

  11. Estimation of 18FDG doses's cost

    International Nuclear Information System (INIS)

    Hamza, Fatma; Amouri, W.; Jardak, I.; Kallel, F.; Charfeddine, S.; Guermazi, F.

    2013-01-01

    The cyclotron facility, essentially for medical use, is far from being a simple establishment of a dedicated device to accelerate particles producing a beta plus emitter radioelement. The cyclotron site encompasses more over all necessary equipments for the production and the quality control of considered radiotracer that 18 FDG is just one example. This facility is subject to strict standards in terms of radiopharmaceutical production, radiation level, pressure level and airflow resulting in the production of a drug submitted to the MA (Marketing Authorization). These multiple factors directly influence the final cost of the dose that remains to be reachable by the patient. The aim of this work is to estimate the cost of a dose of 18 FDG to ensure financial viability of the project while accessible to the patient. The cost of the facility will entail the following: buildings and utilities, equipment and operational cost. This calculation is possible only if we define in advance the type of cyclotron, which is bound to the market needs in particular the number of PET facilities, the number of scans per day and the radioactive decay of radioelement. Our study represents a simulation that considers some hypothesis. We assumed that the cyclotron is installed in Sousse and that the PET facilities number (positon emission tomography) is 6 in which 4 are located 2 hours away. For a PET scan, the average dose per patient is about 350 MBq (5 MBq/kg) and the exam duration is about 45 minutes. Each center performs 10 tests per day. In terms of fees, we considered device and building's cost, facility amortization, consumables (target, marking accessories), maintenance, remuneration expense and the annual electricity consumption. All our calculations have been reported to the number of working days per year. The estimates were made outside the customs duties and technical assistance that may last up to 2 years. Requirements and needs were estimated at 5.4 curies per day. For

  12. Probabilistic estimates of US uranium supply

    International Nuclear Information System (INIS)

    Piepel, G.F.; Long, L.W.; McLaren, R.A.; Ford, C.E.

    1981-02-01

    This report develops and presents probabilistic estimates of total US uranium supply. The word supply is used in the broad sense that both uranium quantity and cost are of interest. Cost implies minimum acceptable selling price rather than market price. Specifically, four types of probability distributions are developed: (1) quantity of US uranium; (2) cost of US uranium; (3) quantity of US uranium available at or below a certain cost; and (4) cost of US uranium given a certain consumption. In this report, uranium refers to recoverable U 3 O 8 (endowment adjusted for mining recovery and milling losses) occurring in both reserve and potential deposits meeting minimum size requirements with minimum grade above 0.01%. Cost includes operating and capital costs, taxes, profit, and cost capital. This definition of cost is often used to better denote this meaning. This definition of cost is contrasted with forward costs, that exclude sunk costs, taxes, and return on investment. Consumption refers to uranium that has been used from the current time to any point in the future. Uranium quantity and consumption are expressed in short tons, while full recovery costs are stated in constant 1980 dollars per pound

  13. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  14. Limits to productive capital investments

    International Nuclear Information System (INIS)

    Seifritz, W.

    1984-07-01

    The rise in the specific capital costs of nuclear power plants has caused concern in all industrialized countries in the past few years. Although the amount of this rise differed and at least did not jeopardize the cost edge of nuclear power in Europe, it did result in cost advantages of coal over nuclear power in a number of Federal States in the USA. The cost development in nuclear power plant construction up to the present level of capital costs was due chiefly to intolerable extensions of construction periods as a consequence of dragging licensing procedures, most of them entailing additional conditions which were partly a matter of dispute. There is broad agreement on the need to not detract from the nuclear safety level now attained, but also on the inability to increase it further by any significant margin. It has become evident in the past that, from a certain level onward, additional measures may in fact reduce the level of safety. In this contribution an attempt is made to delineate the framework of reasonable capital expenditure. From this point of departure, realistic considerations of safety and environmental protection can be made for future orientation. (orig.)

  15. Venture Capital and Innovation Strategies

    NARCIS (Netherlands)

    Da Rin, M.; Penas, M.F.

    2015-01-01

    Venture capital is a specialized form of financial intermediation that often provides funding for costly technological innovation. Venture capital firms need to exit portfolio companies within about five years from the investment to generate returns for institutional investors. This paper is the

  16. Total generating costs: coal and nuclear plants

    International Nuclear Information System (INIS)

    1979-02-01

    The study was confined to single and multi-unit coal- and nuclear-fueled electric-generating stations. The stations are composed of 1200-MWe PWRs; 1200-MWe BWRs; 800-and 1200-MWe High-Sulfur Coal units, and 800- and 1200-MWe Low-Sulfur Coal units. The total generating cost estimates were developed for commercial operation dates of 1985 and 1990; for 5 and 8% escalation rates, for 10 and 12% discount rates; and, for capacity factors of 50, 60, 70, and 80%. The report describes the methodology for obtaining annualized capital costs, levelized coal and nuclear fuel costs, levelized operation and maintenance costs, and the resulting total generating costs for each type of station. The costs are applicable to a hypothetical Middletwon site in the Northeastern United States. Plant descriptions with general design parameters are included. The report also reprints for convenience, summaries of capital cost by account type developed in the previous commercial electric-power cost studies. Appropriate references are given for additional detailed information. Sufficient detail is given to allow the reader to develop total generating costs for other cases or conditions

  17. Estimating the economic cost of disability in Ireland

    OpenAIRE

    Cullinan, John; Gannon, Brenda; Lyons, Seán

    2008-01-01

    Addressing the extra economic costs of disability seems a logical step towards alleviating elements of social exclusion for people with disabilities. This paper estimates the economic cost of disability in Ireland in terms of the additional spending needs that arise due to disability. It defines and estimates models of the private costs borne by families with individuals who have a disability in Ireland when compared to the wider population, both in general and by severity of illness. Our mod...

  18. A Probabilistic Cost Estimation Model for Unexploded Ordnance Removal

    National Research Council Canada - National Science Library

    Poppe, Peter

    1999-01-01

    ...) contaminated sites that the services must decontaminate. Existing models for estimating the cost of UXO removal often require a high level of expertise and provide only a point estimate for the costs...

  19. 40 CFR 261.142 - Cost estimate.

    Science.gov (United States)

    2010-07-01

    ... hazardous waste, and the potential cost of closing the facility as a treatment, storage, and disposal... facility. (3) The cost estimate may not incorporate any salvage value that may be realized with the sale of... no later than 30 days after a change in a facility's operating plan or design that would increase the...

  20. 16 CFR 305.5 - Determinations of estimated annual energy consumption, estimated annual operating cost, and...

    Science.gov (United States)

    2010-01-01

    ... consumption, estimated annual operating cost, and energy efficiency rating, and of water use rate. 305.5... RULE CONCERNING DISCLOSURES REGARDING ENERGY CONSUMPTION AND WATER USE OF CERTAIN HOME APPLIANCES AND... § 305.5 Determinations of estimated annual energy consumption, estimated annual operating cost, and...

  1. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  2. Factors explaining the level of voluntary human capital disclosure in the Brazilian capital market

    Directory of Open Access Journals (Sweden)

    Fernando Batista Fontana

    2013-04-01

    Full Text Available Purpose: This paper presents a study on factors explaining the level of voluntary human capital information in companies with shares in the Brazilian stock exchange. Assuming the existence of information asymmetry between managers and shareholders, agency theory states that disclosure might lead to a reduction in agency costs. The proprietary costs theory indicates that information disclosure might increase the company’s costs. According to these theories, the likelihood that the managers will voluntarily disclose information depends on certain factors that are characteristic of the company. Understanding the disclosure of information regarding intangible assets, specifically human capital, has strategic relevance for enterprises because these features, although not always recorded in accounting, represent a competitive business edge in the current economy.Design/methodology/approach: The study examined 145 annual reports, representing 29 companies in the period of 2005-2009. The level of voluntary disclosure was determined through content analysis of annual reports using representative indicators of human capital information.Findings: The statistical results indicate that factors such as size, debt, growth and time of registration with the brazilian Securities and Exchange Commission explain the level of voluntary human capital disclosure of the companies studied.Originality/value: An important contribution of this research is the formulation and non-repudiation of the time of registration with the CVM hypothesis as a factor that explains the level of human capital disclosure because none of the revised studies have tested this hypothesis.

  3. Method for developing cost estimates for generic regulatory requirements

    International Nuclear Information System (INIS)

    1985-01-01

    The NRC has established a practice of performing regulatory analyses, reflecting costs as well as benefits, of proposed new or revised generic requirements. A method had been developed to assist the NRC in preparing the types of cost estimates required for this purpose and for assigning priorities in the resolution of generic safety issues. The cost of a generic requirement is defined as the net present value of total lifetime cost incurred by the public, industry, and government in implementing the requirement for all affected plants. The method described here is for commercial light-water-reactor power plants. Estimating the cost for a generic requirement involves several steps: (1) identifying the activities that must be carried out to fully implement the requirement, (2) defining the work packages associated with the major activities, (3) identifying the individual elements of cost for each work package, (4) estimating the magnitude of each cost element, (5) aggregating individual plant costs over the plant lifetime, and (6) aggregating all plant costs and generic costs to produce a total, national, present value of lifetime cost for the requirement. The method developed addresses all six steps. In this paper, we discuss on the first three

  4. Specification errors in estimating cost functions: the case of the nuclear-electric-generating industry

    International Nuclear Information System (INIS)

    Jorgensen, E.J.

    1987-01-01

    This study is an application of production-cost duality theory. Duality theory is reviewed for the competitive and rate-of-return regulated firm. The cost function is developed for the nuclear electric-power-generating industry of the United States using capital, fuel, and labor factor inputs. A comparison is made between the Generalized Box-Cox (GBC) and Fourier Flexible (FF) functional forms. The GBC functional form nests the Generalized Leontief, Generalized Square Root Quadratic and Translog functional forms, and is based upon a second-order Taylor-series expansion. The FF form follows from a Fourier-series expansion in sine and cosine terms using the Sobolev norm as the goodness-of-fit measure. The Sobolev norm takes into account first and second derivatives. The cost function and two factor shares are estimated as a system of equations using maximum-likelihood techniques, with Additive Standard Normal and Logistic Normal error distributions. In summary, none of the special cases of the GBC function form are accepted. Homotheticity of the underlying production technology can be rejected for both GBC and FF forms, leaving only the unrestricted versions supported by the data. Residual analysis indicates a slight improvement in skewness and kurtosis for univariate and multivariate cases when the Logistic Normal distribution is used

  5. Cost estimate of electricity produced by TPV

    Science.gov (United States)

    Palfinger, Günther; Bitnar, Bernd; Durisch, Wilhelm; Mayor, Jean-Claude; Grützmacher, Detlev; Gobrecht, Jens

    2003-05-01

    A crucial parameter for the market penetration of TPV is its electricity production cost. In this work a detailed cost estimate is performed for a Si photocell based TPV system, which was developed for electrically self-powered operation of a domestic heating system. The results are compared to a rough estimate of cost of electricity for a projected GaSb based system. For the calculation of the price of electricity, a lifetime of 20 years, an interest rate of 4.25% per year and maintenance costs of 1% of the investment are presumed. To determine the production cost of TPV systems with a power of 12-20 kW, the costs of the TPV components and 100 EUR kW-1el,peak for assembly and miscellaneous were estimated. Alternatively, the system cost for the GaSb system was derived from the cost of the photocells and from the assumption that they account for 35% of the total system cost. The calculation was done for four different TPV scenarios which include a Si based prototype system with existing technology (etasys = 1.0%), leading to 3000 EUR kW-1el,peak, an optimized Si based system using conventional, available technology (etasys = 1.5%), leading to 900 EUR kW-1el,peak, a further improved system with future technology (etasys = 5%), leading to 340 EUR kW-1el,peak and a GaSb based system (etasys = 12.3% with recuperator), leading to 1900 EUR kW-1el,peak. Thus, prices of electricity from 6 to 25 EURcents kWh-1el (including gas of about 3.5 EURcents kWh-1) were calculated and compared with those of fuel cells (31 EURcents kWh-1) and gas engines (23 EURcents kWh-1).

  6. Estimating pharmacy level prescription drug acquisition costs for third-party reimbursement.

    Science.gov (United States)

    Kreling, D H; Kirk, K W

    1986-07-01

    Accurate payment for the acquisition costs of drug products dispensed is an important consideration in a third-party prescription drug program. Two alternative methods of estimating these costs among pharmacies were derived and compared. First, pharmacists were surveyed to determine the purchase discounts offered to them by wholesalers. A 10.00% modal and 11.35% mean discount resulted for 73 responding pharmacists. Second, cost-plus percents derived from gross profit margins of wholesalers were calculated and applied to wholesaler product costs to estimate pharmacy level acquisition costs. Cost-plus percents derived from National Median and Southwestern Region wholesaler figures were 9.27% and 10.10%, respectively. A comparison showed the two methods of estimating acquisition costs would result in similar acquisition cost estimates. Adopting a cost-plus estimating approach is recommended because it avoids potential pricing manipulations by wholesalers and manufacturers that would negate improvements in drug product reimbursement accuracy.

  7. Estimating the cost of disposal for Canada's nuclear fuel waste

    International Nuclear Information System (INIS)

    Ates, Y.

    1996-07-01

    Atomic Energy of Canada Ltd (AECL) prepared an Environmental Impact Statement and nine supporting Primary Reference Documents on the concept for disposal of Canada's nuclear fuel waste. This report summarizes the basis of the cost estimate which is provided in the primary reference document on engineering for a disposal facility. The scope of the cost estimate is explained by describing the key features of the disposal facility design, by noting the major assumptions made in preparing the estimates, and by listing the included and excluded cost components. An activity-based project planning and control method is explained whereby the project schedule, costs, and personnel requirements are interlinked; forming an integrated perspective on the total project life cycle. The summary and distribution of costs in each project stage by major facility or activity are presented. The results of studies which reviewed the overall cost estimate are also described. These studies indicate that, within the scope, the estimate is reasonable and compares well with similar international studies. (author)

  8. Unmanned Aerial Vehicles unique cost estimating requirements

    Science.gov (United States)

    Malone, P.; Apgar, H.; Stukes, S.; Sterk, S.

    Unmanned Aerial Vehicles (UAVs), also referred to as drones, are aerial platforms that fly without a human pilot onboard. UAVs are controlled autonomously by a computer in the vehicle or under the remote control of a pilot stationed at a fixed ground location. There are a wide variety of drone shapes, sizes, configurations, complexities, and characteristics. Use of these devices by the Department of Defense (DoD), NASA, civil and commercial organizations continues to grow. UAVs are commonly used for intelligence, surveillance, reconnaissance (ISR). They are also use for combat operations, and civil applications, such as firefighting, non-military security work, surveillance of infrastructure (e.g. pipelines, power lines and country borders). UAVs are often preferred for missions that require sustained persistence (over 4 hours in duration), or are “ too dangerous, dull or dirty” for manned aircraft. Moreover, they can offer significant acquisition and operations cost savings over traditional manned aircraft. Because of these unique characteristics and missions, UAV estimates require some unique estimating methods. This paper describes a framework for estimating UAV systems total ownership cost including hardware components, software design, and operations. The challenge of collecting data, testing the sensitivities of cost drivers, and creating cost estimating relationships (CERs) for each key work breakdown structure (WBS) element is discussed. The autonomous operation of UAVs is especially challenging from a software perspective.

  9. Electrostatic direct energy converter performance and cost scaling laws

    International Nuclear Information System (INIS)

    Hoffman, M.A.

    1977-08-01

    This study is concerned with electrostatic type direct energy converters for direct recovery of a large fraction of the plasma ion energy from fusion reactors. Simplified equations are presented for each of the important loss mechanisms in both single-stage direct converters and multistage ''Venetian Blind'' type direct converters. These equations can be used to estimate the efficiency and electric power output of the direct converter subsystem. Scaling relations for the cost of each major component in the direct converter subsystem are also given; these include the vacuum tank, direct converter modules, the DC power conditioning equipment, cryogenic vacuum pumping system and the thermal bottoming plant. The performance and cost scaling laws have been developed primarily for use in overall fusion power plant systems codes. However, to illustrate their utility, cost-effectiveness studies of two specific reference direct converter designs are presented in terms of the specific capital costs (i.e., the capital cost per unit electric power produced) for the Direct Converter Subsystem alone. Some examples of design improvements which can significantly reduce the specific capital costs of the Direct Converter Subsystem are also given

  10. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  11. Cost Estimation for Research Reactor Decommissioning

    International Nuclear Information System (INIS)

    2013-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world'. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The purpose of this publication is to develop a costing methodology and a software tool in order to support cost estimation for research reactor decommissioning. The costing methodology is intended for the preliminary cost estimation stages for research reactor decommissioning with limited inventory data and other input data available. Existing experience in decommissioning costing is considered. As the basis for the cost calculation structure, the costing model uses the International Structure for Decommissioning Costing (ISDC) that is recommended by the IAEA, the Organisation for

  12. A contemporary perspective on capitated reimbursement for imaging services.

    Science.gov (United States)

    Schwartz, H W

    1995-01-01

    Capitation ensures predictability of healthcare costs, requires acceptance of a premium in return for providing all required medical services and defines the actual dollar amount paid to a physician or hospital on a per member per month basis for a service or group of services. Capitation is expected to dramatically affect the marketplace in the near future, as private enterprise demands lower, more stable healthcare costs. Capitation requires detailed quantitative and financial data, including: eligibility and benefits determination, encounter processing, referral management, claims processing, case management, physician compensation, insurance management functions, outcomes reporting, performance management and cost accounting. It is important to understand actuarial risk and capitation marketing when considering a capitation contract. Also, capitated payment methodologies may vary to include modified fee-for-service, incentive pay, risk pool redistributions, merit, or a combination. Risk is directly related to the ability to predict utilization and unit cost of imaging services provided to a specific insured population. In capitated environments, radiologists will have even less control over referrals than they have today and will serve many more "covered lives"; long-term relationships with referring physicians will continue to evaporate; and services will be provided under exclusive, multi-year contracts. In addition to intensified use of technology for image transfer, telecommunications and sophisticated data processing and tracking systems, imaging departments must continue to provide the greatest amount of appropriate diagnostic information in a timely fashion at the lowest feasible cost and risk to the patient.

  13. Estimating the mental health costs of racial discrimination

    Directory of Open Access Journals (Sweden)

    Amanuel Elias

    2016-11-01

    Full Text Available Abstract Background Racial discrimination is a pervasive social problem in several advanced countries such as the U.S., U.K., and Australia. Public health research also indicates a range of associations between exposure to racial discrimination and negative health, particularly, mental health including depression, anxiety, and post-traumatic stress disorder (PTSD. However, the direct negative health impact of racial discrimination has not been costed so far although economists have previously estimated indirect non-health related productivity costs. In this study, we estimate the burden of disease due to exposure to racial discrimination and measure the cost of this exposure. Methods Using prevalence surveys and data on the association of racial discrimination with health outcomes from a global meta-analysis, we apply a cost of illness method to measure the impact of racial discrimination. This estimate indicates the direct health cost attributable to racial discrimination and we convert the estimates to monetary values based on conventional parameters. Results Racial discrimination costs the Australian economy 235,452 in disability adjusted life years lost, equivalent to $37.9 billion per annum, roughly 3.02% of annual gross domestic product (GDP over 2001–11, indicating a sizeable loss for the economy. Conclusion Substantial cost is incurred due to increased prevalence of racial discrimination as a result of its association with negative health outcomes (e.g. depression, anxiety and PTSD. This implies that potentially significant cost savings can be made through measures that target racial discrimination. Our research contributes to the debate on the social impact of racial discrimination, with implications for policies and efforts addressing it.

  14. Academic health systems management: the rationale behind capitated contracts.

    Science.gov (United States)

    Taheri, P A; Butz, D A; Greenfield, L J

    2000-06-01

    To determine why hospitals enter into "capitated" contracts, which often generate accounting losses. The authors' hypothesis is that hospitals coordinate contracts to keep beds full and that in principal, capitated contracts reflect sound capacity management. In high-overhead industries, different consumers pay different prices for similar services (e.g., full-fare vs. advanced-purchase plane tickets, full tuition vs. financial aid). Some consumers gain access by paying less than total cost. Hospitals, like other high-overhead business enterprises, must optimize the use of their capacity, amortizing overhead over as many patients as possible. This necessity for enhanced throughput forces hospitals and health systems to discount empty beds, sometimes to the point where they incur accounting losses serving some payors. The authors analyzed the cost accounting system at their university teaching hospital to compare hospital and intensive care unit (ICU) lengths of stay (LOS), variable direct costs (VDC), overhead of capitated patients, and reimbursement versus other payors for all hospital discharges (n = 29,036) in fiscal year 1998. The data were analyzed by diagnosis-related groups (DRGs), length of stay (LOS), insurance carrier, proximity to hospital, and discharge disposition. Patients were then distinguished across payor categories based on their resource utilization, proximity to the hospital, DRG, LOS, and discharge status. The mean cost for capitated patients was $4,887, less than half of the mean cost of $10,394 for the entire hospitalized population. The mean capitated reimbursement was $928/day, exceeding the mean daily VDC of $616 but not the total cost of $1,445/day. Moreover, the mean total cost per patient day of treating a capitated patient was $400 less than the mean total cost per day for noncapitated patients. The hospital's capitated health maintenance organization (HMO) patients made up 16. 0% of the total admissions but only 9.4% of the total

  15. Cost estimation and management over the life cycle of metallurgical ...

    African Journals Online (AJOL)

    This study investigates whether all expected costs over the life cycle of metallurgical research projects are included in initial, normal and fi nal cost estimates, and whether these costs are managed throughout a project's life cycle since there is not enough emphasis on the accurate estimation of costs and their management ...

  16. Social capital, houshold welfare, and poverty in Indonesia

    OpenAIRE

    Grootaert, Christiaan

    1999-01-01

    The author empirically estimates how social capital affects household welfare and poverty in Indonesia. His focus: household memberships in local associations, an aspect of social capital especially relevant to daily household decisions that affect welfare and consumption. The data suggest that households with higher social capital spend more per capita. They also have more assets, more savings, and better access to credit. To estimate how social capital contributes to household welfare, the ...

  17. The pitfalls of capital budgeting : when costs correlate to oil price. Is the real-options approach superior to traditional valuation?

    Energy Technology Data Exchange (ETDEWEB)

    Schiozer, R.F. [Getulio Vargas Foundation, Sao Paolo (Brazil). School of Administration de Empresas; Costa Lima, G.A.; Suslick, S.B. [Unicamp, Campinas (Brazil). Center of Petroleum Studies

    2007-07-01

    Due to increased demand for drilling rigs, specialized labor force and other resources, the costs of exploration, appraisal, development and production have significantly risen over the last five years. The change in costs has mostly been attributed to the increased activity in the oil and gas exploration and production (EP) industry, as a result of the increase in oil prices. It was hypothesized that operating costs in the EP industry were strongly correlated to the price of oil. However, the correlation between prices and costs has traditionally been overlooked in the capital budgeting process. This paper investigated the economic relationship between oil price and the operating costs in the EP industry. It also explored its implications for the capital budgeting process and decision-making. The paper demonstrated the evaluation of projects under traditional net present value (NPV) and real-option approaches. Empirical evidence was also provided on how costs correlated to oil prices. The differences between project valuation when cost-price correlation was taken into account or not was also discussed. Last, findings, conclusions and general implications of the results obtained for the decision-making process were identified. It was concluded that there was a positive correlation between price and operating costs, and that overlooking this relationship would have significant implications on the valuation of investment projects, both using a traditional NPV methodology, which resulted in undervalued projects, and under real option analysis, which resulted in overvaluing projects. 6 refs., 2 tabs., 5 figs.

  18. The pitfalls of capital budgeting : when costs correlate to oil price. Is the real-options approach superior to traditional valuation?

    International Nuclear Information System (INIS)

    Schiozer, R.F.; Costa Lima, G.A.; Suslick, S.B.

    2007-01-01

    Due to increased demand for drilling rigs, specialized labor force and other resources, the costs of exploration, appraisal, development and production have significantly risen over the last five years. The change in costs has mostly been attributed to the increased activity in the oil and gas exploration and production (EP) industry, as a result of the increase in oil prices. It was hypothesized that operating costs in the EP industry were strongly correlated to the price of oil. However, the correlation between prices and costs has traditionally been overlooked in the capital budgeting process. This paper investigated the economic relationship between oil price and the operating costs in the EP industry. It also explored its implications for the capital budgeting process and decision-making. The paper demonstrated the evaluation of projects under traditional net present value (NPV) and real-option approaches. Empirical evidence was also provided on how costs correlated to oil prices. The differences between project valuation when cost-price correlation was taken into account or not was also discussed. Last, findings, conclusions and general implications of the results obtained for the decision-making process were identified. It was concluded that there was a positive correlation between price and operating costs, and that overlooking this relationship would have significant implications on the valuation of investment projects, both using a traditional NPV methodology, which resulted in undervalued projects, and under real option analysis, which resulted in overvaluing projects. 6 refs., 2 tabs., 5 figs

  19. 48 CFR 1852.216-84 - Estimated cost and incentive fee.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.216-84 Estimated cost and incentive fee. As prescribed in 1816.406-70(d), insert the following clause: Estimated Cost and Incentive Fee (OCT 1996) The target cost of this contract is $___. The target fee of this contract is $___. The total target cost and target fee as contemplated by the...

  20. Estimating the Cost of Providing Foundational Public Health Services.

    Science.gov (United States)

    Mamaril, Cezar Brian C; Mays, Glen P; Branham, Douglas Keith; Bekemeier, Betty; Marlowe, Justin; Timsina, Lava

    2017-12-28

    To estimate the cost of resources required to implement a set of Foundational Public Health Services (FPHS) as recommended by the Institute of Medicine. A stochastic simulation model was used to generate probability distributions of input and output costs across 11 FPHS domains. We used an implementation attainment scale to estimate costs of fully implementing FPHS. We use data collected from a diverse cohort of 19 public health agencies located in three states that implemented the FPHS cost estimation methodology in their agencies during 2014-2015. The average agency incurred costs of $48 per capita implementing FPHS at their current attainment levels with a coefficient of variation (CV) of 16 percent. Achieving full FPHS implementation would require $82 per capita (CV=19 percent), indicating an estimated resource gap of $34 per capita. Substantial variation in costs exists across communities in resources currently devoted to implementing FPHS, with even larger variation in resources needed for full attainment. Reducing geographic inequities in FPHS may require novel financing mechanisms and delivery models that allow health agencies to have robust roles within the health system and realize a minimum package of public health services for the nation. © Health Research and Educational Trust.

  1. Comparing Methods for Estimating Direct Costs of Adverse Drug Events.

    Science.gov (United States)

    Gyllensten, Hanna; Jönsson, Anna K; Hakkarainen, Katja M; Svensson, Staffan; Hägg, Staffan; Rehnberg, Clas

    2017-12-01

    To estimate how direct health care costs resulting from adverse drug events (ADEs) and cost distribution are affected by methodological decisions regarding identification of ADEs, assigning relevant resource use to ADEs, and estimating costs for the assigned resources. ADEs were identified from medical records and diagnostic codes for a random sample of 4970 Swedish adults during a 3-month study period in 2008 and were assessed for causality. Results were compared for five cost evaluation methods, including different methods for identifying ADEs, assigning resource use to ADEs, and for estimating costs for the assigned resources (resource use method, proportion of registered cost method, unit cost method, diagnostic code method, and main diagnosis method). Different levels of causality for ADEs and ADEs' contribution to health care resource use were considered. Using the five methods, the maximum estimated overall direct health care costs resulting from ADEs ranged from Sk10,000 (Sk = Swedish krona; ~€1,500 in 2016 values) using the diagnostic code method to more than Sk3,000,000 (~€414,000) using the unit cost method in our study population. The most conservative definitions for ADEs' contribution to health care resource use and the causality of ADEs resulted in average costs per patient ranging from Sk0 using the diagnostic code method to Sk4066 (~€500) using the unit cost method. The estimated costs resulting from ADEs varied considerably depending on the methodological choices. The results indicate that costs for ADEs need to be identified through medical record review and by using detailed unit cost data. Copyright © 2017 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  2. Trends in Opportunity Costs of U.S. Postsecondary Education: A National HRD and Human Capital Theory Analysis

    Science.gov (United States)

    Cornacchione, Edgard; Daugherty, Jenny L.

    2013-01-01

    The purpose of this study was to explore opportunity costs of postsecondary education in the U.S. in the past three decades (1975-2005), as a measure to support investment decisions at national levels and as experienced by individuals deciding on pursuing further education. Based on human capital theory and inspired by a set of studies aiming at…

  3. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  4. Venture Guidance Appraisal cost estimates for groundwater protection Environmental Impact Statement

    International Nuclear Information System (INIS)

    Moyer, R.A.

    1987-01-01

    Cost estimates were prepared for closure options at criteria waste sites and alternatives for new disposal facilities for hazardous wastes, mixed wastes, low level radioactive wastes and slurry from liquid waste treatment facilities. Because these cost estimates will be used in the Groundwater Protection EIS, the goal was to develop ''enveloping'' costs, i.e., the alternative or option chosen for execution at a later date should cost no more than the estimate. This report summarizes scenarios for making detailed cost estimates. Also included are unit costs for disposition of potential excavations, for operational activities, and for groundwater monitoring and site maintenance after closure of the site. The cost numbers presented are intended for study purposes only and not for budgetary activities

  5. Nonfuel OandM costs for laser and heavy-ion fusion power plants

    International Nuclear Information System (INIS)

    Pendergrass, J.H.

    1986-01-01

    Very simple nonfuel operating and maintenance (OandM) cost models have been used in many inertial confinement fusion (ICF) commercial applications studies. Often, ICF OandM costs have been accounted for by adding a small fraction of plant initial capital cost to other annual power production costs. Lack of definition of ICF technology and/or perceptions that OandM costs would be small relative to capital-related costs are some reasons for such simple treatments. This approach does not permit rational treatment of potentially significant differences in OandM costs for ICF plants with different driver, reactor, target, etc., technologies or rational comparisons with conventional technologies. Improved understanding of ICF makes more accurate estimates for some OandM costs appear feasible. More detailed OandM cost models, even if of modest accuracy in some areas, are useful for comparisons

  6. Cost estimate of bovine tuberculosis to Ethiopia.

    Science.gov (United States)

    Tschopp, Rea; Hattendorf, Jan; Roth, Felix; Choudhury, Adnan Ali Khan; Choudhoury, Adnan; Shaw, Alexandra; Aseffa, Abraham; Zinsstag, Jakob

    2013-01-01

    While bovine tuberculosis (BTB) has been eliminated in some industrialized countries, it prevails worldwide, particularly in Africa. In Ethiopia, BTB is prevalent as numerous studies have shown its occurrence in livestock and in abattoirs but it has not been demonstrated in wildlife and only very few cases have been found in humans. The objective of this study is to estimate the cost of BTB to Ethiopia with the aim of informing Ethiopian policy on options for BTB control. BTB in livestock affects both animal productivity and herd demographic composition. The Livestock Development Planning System (LDPS2, FAO) was modified to allow for stochastic simulation of parameters. We performed an incremental cost of disease analysis, comparing livestock production with and without BTB. For the rural scenario we considered an endemically stable 4 % comparative intradermal test (CIDT) prevalence and for the urban scenario an endemically stable 32 % CIDT prevalence among cattle. The net present value of rural Ethiopian livestock products in 2005 is estimated at 65.7 billion (thousand million) Ethiopian Birr (95 % Confidence Interval (CI) 53.8-77.7 billion Birr), which is the equivalent of 7.5 billion US$ (95 %CI 6.1-8.9 billion US$) at a rate of 8.7 Birr per US$ in 2005. The cost of BTB ranges from 646 million Birr (75.2 million US$) in 2005 to 3.1 Billion Birr in 2011 (358 million US$) but is within the range of uncertainty of our estimate and can thus not be distinguished from zero. The cost of disease in the urban livestock production ranges from 5 to 42 million Birr (500,000-4.9 million US$) between 2005 and 2011 but is also within the range of uncertainty of our estimate. Our study shows no measurable loss in asset value or cost of disease due to BTB in rural and urban production systems in Ethiopia. This does not mean that there is not a real cost of disease, but the variability of the productivity parameters and prices are high and would require more precise estimates

  7. An improved COCOMO software cost estimation model | Duke ...

    African Journals Online (AJOL)

    In this paper, we discuss the methodologies adopted previously in software cost estimation using the COnstructive COst MOdels (COCOMOs). From our analysis, COCOMOs produce very high software development efforts, which eventually produce high software development costs. Consequently, we propose its extension, ...

  8. Failing to Estimate the Costs of Offshoring

    DEFF Research Database (Denmark)

    Møller Larsen, Marcus

    2016-01-01

    This article investigates cost estimation errors in the context of offshoring. It is argued that an imprecise estimation of the costs related to implementing a firm activity in a foreign location has a negative impact on the process performance of that activity. Performance is deterred...... as operations are likely to be disrupted by managerial distraction and resource misallocation. It is also argued that this relationship is mitigated by the extent to which firms use modularity to coordinate the activity but worsened by the extent to which ongoing communication is used. The results, based...

  9. Reducing Inventory System Costs by Using Robust Demand Estimators

    OpenAIRE

    Raymond A. Jacobs; Harvey M. Wagner

    1989-01-01

    Applications of inventory theory typically use historical data to estimate demand distribution parameters. Imprecise knowledge of the demand distribution adds to the usual replenishment costs associated with stochastic demands. Only limited research has been directed at the problem of choosing cost effective statistical procedures for estimating these parameters. Available theoretical findings on estimating the demand parameters for (s, S) inventory replenishment policies are limited by their...

  10. The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities

    International Nuclear Information System (INIS)

    Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee

    2007-01-01

    Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

  11. Supercritical Carbon Dioxide Power Generation System Definition: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and 30 percent further reductions by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO2 cycle

  12. Academic Health Systems Management: The Rationale Behind Capitated Contracts

    Science.gov (United States)

    Taheri, Paul A.; Butz, David A.; Greenfield, Lazar J.

    2000-01-01

    Objective To determine why hospitals enter into “capitated” contracts, which often generate accounting losses. The authors’ hypothesis is that hospitals coordinate contracts to keep beds full and that in principal, capitated contracts reflect sound capacity management. Summary Background Data In high-overhead industries, different consumers pay different prices for similar services (e.g., full-fare vs. advanced-purchase plane tickets, full tuition vs. financial aid). Some consumers gain access by paying less than total cost. Hospitals, like other high-overhead business enterprises, must optimize the use of their capacity, amortizing overhead over as many patients as possible. This necessity for enhanced throughput forces hospitals and health systems to discount empty beds, sometimes to the point where they incur accounting losses serving some payors. Methods The authors analyzed the cost accounting system at their university teaching hospital to compare hospital and intensive care unit (ICU) lengths of stay (LOS), variable direct costs (VDC), overhead of capitated patients, and reimbursement versus other payors for all hospital discharges (n = 29,036) in fiscal year 1998. The data were analyzed by diagnosis-related groups (DRGs), length of stay (LOS), insurance carrier, proximity to hospital, and discharge disposition. Patients were then distinguished across payor categories based on their resource utilization, proximity to the hospital, DRG, LOS, and discharge status. Results The mean cost for capitated patients was $4,887, less than half of the mean cost of $10,394 for the entire hospitalized population. The mean capitated reimbursement was $928/day, exceeding the mean daily VDC of $616 but not the total cost of $1,445/day. Moreover, the mean total cost per patient day of treating a capitated patient was $400 less than the mean total cost per day for noncapitated patients. The hospital’s capitated health maintenance organization (HMO) patients made up 16

  13. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  14. Credit risk in the pool-implications for private capital investments in Brazilian power generation

    International Nuclear Information System (INIS)

    Rocha, Katia; Alcaraz Garcia, Francisco A.

    2006-01-01

    The new Brazilian Electric Sector Regulation of 2004 introduced two negotiation markets: the regulated pool and the free market. Competition in the pool is enforced via energy auctions, where the winning generator has to sign long-term power purchase agreements simultaneously with all distributors at the bidding-price. To estimate the appropriate credit risk spread of the pool, we implement a clustering methodology to rank and rate the distributors. The results show an average spread between 5.75% and 8.5%, which corresponds to a credit rating of B- according to the spreads available in Reuters 2004. This estimation is at least 208 basis points higher than the credit rating Ba1/BB+ assigned to the distributors by the National Electric Energy Agency (ANEEL) in the periodic tariff revisions. Distributors with higher risk/spread are located in the South-Southeast, compared to the low risk/spread ones concentrated in the North-Northeast. We estimate the opportunity cost of capital in real terms in the range of 13-16% to account for the credit risk of the pool. Essential to determine the bidding price at the auctions, this estimation is higher than the 11.26% opportunity cost estimated by ANEEL. The pool's credit risk has to be taken into consideration, especially for compensating new private capital investments in Brazilian power generation

  15. Capital cost evaluation of liquid metal reactor by plant type - comparison of modular type with monolithic type -

    International Nuclear Information System (INIS)

    Mun, K. H.; Seok, S. D.; Song, K. D.; Kim, I. C.

    1999-01-01

    A preliminary economic comparison study was performed for KALIMER(Korea Advanced LIquid MEtal Reactor)between a modular plant type with 8 150MWe modules and a 1200MWe monolithic plant type. In both cases of FOAK (First-Of-A-Kind) Plant and NOAK (Nth-Of-A-Kind) Plant, the result says that the economics of monolithic plant is superior to its modular plant. In case of NOAK plant comparison, however, the cost difference is not significant. It means that modular plant can compete with monolithic plant in capital cost if it makes efforts of cost reduction and technical progress on the assumption that the same type of NOAK plant will be constructed continuously

  16. Structural Estimation of Stock Market Participation Costs

    DEFF Research Database (Denmark)

    Khorunzhina, Natalia

    2013-01-01

    education programs can affect consumers' investment decisions. Using household data from the Panel Study of Income Dynamics, I estimate the magnitude of the participation cost, allowing for individual heterogeneity in it. The results show the average stock market participation cost is about 4–6% of labor...

  17. Cost of malaria control in Sri Lanka

    DEFF Research Database (Denmark)

    Konradsen, F; Steele, P; Perera, D

    1999-01-01

    to cost Rs 48 (US(40.87) per individual protected per year, less than half the cost of spraying houses with residual insecticides. Larviciding of vector breeding sites and especially the elimination of breeding habitats by flushing streams through seasonal release of water from upstream reservoirs...... was estimated to be cheaper than other preventive measures (Rs 27 (US$ 0.49) and Rs 13 (US$ 0.24) per individual protected, respectively). Inclusion of both operational and capital costs of treatment indicates that the most cost-effective intervention for the government was a centrally located hospital...

  18. The limits to productive capital investments

    International Nuclear Information System (INIS)

    Seifritz, W.

    1984-01-01

    The rise in the specific capital costs of nuclear power plants has caused concern in all industrialized countries in the past few years. Although the amount of this rise differed and, for instance, at least did not jeopardize the cost edge of nuclear power in Europe, it did result in cost advantages of coal over nuclear power in a number of Federal States in the USA. The cost development in nuclear power plant construction up to the present level of capital costs was due chiefly to intolerable extensions of construction periods as a consequence of dragging licensing procedures, most of them entailing additional conditions which were partly a matter of dispute. There is broad agreement on the need to not detract from the nuclear safety level now attained, but also on the inability to increase it further by any significant margin. It has become evident in the past that, from a certain level onward, additional measures may in fact reduce the level of safety. In this contribution an attempt is made to delineate the framework of reasonble capital expenditure. From this point of departure, realistic considerations of safety and environmental protection can be made for future orientation. (orig.) [de

  19. Ageing, human capital and demographic dividends with endogenous growth, labour supply and foreign capital

    NARCIS (Netherlands)

    Edle von Gaessler, Anne; Ziesemer, Thomas

    2017-01-01

    We modify a Lucas-type endogenous growth model to contain endogenous labour supply, imperfect international capital movements, and estimated interest and education time functions. Solutions based on realistic calibrations show that (i) the rate of human capital depreciation through ageing has a much

  20. Factors explaining the level of voluntary human capital disclosure in the Brazilian capital market Factors explaining the level of voluntary human capital disclosure in the Brazilian capital market Factors explaining the level of voluntary human capital disclosure in the Brazilian capital market

    OpenAIRE

    Clea Beatriz Macagnan; Fernando Batista Fontana

    2013-01-01

    Purpose: This paper presents a study on factors explaining the level of voluntary human capital information in companies with shares in the Brazilian stock exchange. Assuming the existence of information asymmetry between managers and shareholders, agency theory states that disclosure might lead to a reduction in agency costs. The proprietary costs theory indicates that information disclosure might increase the company’s costs. According to these theories, the likelihood that the managers wil...

  1. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  2. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  3. Supportability and purchasing decisions for capital assets: positioning paper

    NARCIS (Netherlands)

    Parada Puig, J.E.; Hoekstra, Sipke; Huisman, B.H.; van Dongen, Leonardus Adriana Maria

    2011-01-01

    Acquisition decisions for capital assets have a titanic impact on the operational costs of capital-intensive organizations. After the acquisition process, the cost of ownership is tied to the design characteristics of the assets, which dictate how they are operated and maintained. This reflects the

  4. How to choose the right capitalization option.

    Science.gov (United States)

    Vaughan, J; Wise, J

    1996-12-01

    Physician group practices and networks must have ready access to capital to finance their working capital needs, capital equipment acquisitions, and real estate purchases, as well as to fund the acquisition of additional practices. At least three options for capitalization are available to group practices and networks: debt financing, equity financing, or a combination of the two. The best option for physician group practices and networks depends on the costs of capital and the impact the strategy will have on decision making and governance.

  5. Video distribution system cost model

    Science.gov (United States)

    Gershkoff, I.; Haspert, J. K.; Morgenstern, B.

    1980-01-01

    A cost model that can be used to systematically identify the costs of procuring and operating satellite linked communications systems is described. The user defines a network configuration by specifying the location of each participating site, the interconnection requirements, and the transmission paths available for the uplink (studio to satellite), downlink (satellite to audience), and voice talkback (between audience and studio) segments of the network. The model uses this information to calculate the least expensive signal distribution path for each participating site. Cost estimates are broken downy by capital, installation, lease, operations and maintenance. The design of the model permits flexibility in specifying network and cost structure.

  6. The Effect of Intellectual Capital on Cost of Finance and Firm Value

    OpenAIRE

    Mohsen Iranmahd; Mahmoud Moeinaddin; Nasim Shahmoradi; Forough Heyrani

    2014-01-01

    In today's knowledge-based industry, the role of intellectual capitals in creating value for the business units is more effective than financial capitals. The accounting system plays a crucial role in finding appropriate strategies for achieving suitable methods of evaluating intellectual capitals. One of the most significant shortcomings of traditional accounting systems is that it doesn't reflect the intellectual capital value in financial reports of business units. Collecting the data from...

  7. Trajectory-Based Operations (TBO) Cost Estimation, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The Innovation Laboratory, Inc., proposes to build a tool to estimate airline costs under TBO. This tool includes a cost model that explicitly reasons about traffic...

  8. A reactor-level analysis of busbar costs for US nuclear plants, 1970-2005

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.

    2007-01-01

    We present a reactor-by-reactor analysis of historical busbar costs for 99 nuclear reactors in the United States, and compare those costs with recent projections for next-generation US reactors. We argue that cost projections far different from median historical costs require more justification than estimates that lie close to those medians. Our analysis suggests that some recent projections of capital costs, construction duration, and total operations and maintenance costs are quite low-far enough from the historical medians that additional scrutiny may be required to justify using such estimates in current policy discussions and planning

  9. Time-driven activity-based costing to estimate cost of care at multidisciplinary aerodigestive centers.

    Science.gov (United States)

    Garcia, Jordan A; Mistry, Bipin; Hardy, Stephen; Fracchia, Mary Shannon; Hersh, Cheryl; Wentland, Carissa; Vadakekalam, Joseph; Kaplan, Robert; Hartnick, Christopher J

    2017-09-01

    Providing high-value healthcare to patients is increasingly becoming an objective for providers including those at multidisciplinary aerodigestive centers. Measuring value has two components: 1) identify relevant health outcomes and 2) determine relevant treatment costs. Via their inherent structure, multidisciplinary care units consolidate care for complex patients. However, their potential impact on decreasing healthcare costs is less clear. The goal of this study was to estimate the potential cost savings of treating patients with laryngeal clefts at multidisciplinary aerodigestive centers. Retrospective chart review. Time-driven activity-based costing was used to estimate the cost of care for patients with laryngeal cleft seen between 2008 and 2013 at the Massachusetts Eye and Ear Infirmary Pediatric Aerodigestive Center. Retrospective chart review was performed to identify clinic utilization by patients as well as patient diet outcomes after treatment. Patients were stratified into neurologically complex and neurologically noncomplex groups. The cost of care for patients requiring surgical intervention was five and three times as expensive of the cost of care for patients not requiring surgery for neurologically noncomplex and complex patients, respectively. Following treatment, 50% and 55% of complex and noncomplex patients returned to normal diet, whereas 83% and 87% of patients experienced improved diets, respectively. Additionally, multidisciplinary team-based care for children with laryngeal clefts potentially achieves 20% to 40% cost savings. These findings demonstrate how time-driven activity-based costing can be used to estimate and compare patient costs in multidisciplinary aerodigestive centers. 2c. Laryngoscope, 127:2152-2158, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.

  10. The optimization of structure of capital firm «Ukrtelecom»

    Directory of Open Access Journals (Sweden)

    M.I. Yaremenko

    2015-03-01

    Full Text Available In the paper the optimization of capital enterprises in the economic crisis, namely the method of Modigliani–Miller. This is especially true because Ukraine is in an economic and financial crisis whose impact on businesses need to level through internal resources and companies with state tax support. Established that the values of financial leverage marginal tax benefits equal marginal cost of bankruptcy, in a model of Modigliani–Miller, taking into account taxes and compromise approach to the capital levels of financial leverage, which costs bankruptcy materialize in cash. Bankruptcy costs depend on the probability of bankruptcy and ruin the company and the value of the costs associated with it. With small loans and low probability of ruin and bankruptcy costs are low. Advantages of taxation lead to higher market price of the capital of the enterprise. Using the tools of financial and operational management, the owners of the firm's capital can allocate losses so that most of them will be in the creditors.

  11. A new approach for product cost estimation using data envelopment analysis

    Directory of Open Access Journals (Sweden)

    Adil Salam

    2012-10-01

    Full Text Available Cost estimation of new products has always been difficult as only few design, manufacturing and operational features will be known. In these situations, parametric or non-parametric methods are commonly used to estimate the cost of a product given the corresponding cost drivers. The parametric models use priori determined cost function where the parameters of the function are evaluated from historical data. Non-parametric methods, on the other hand, attempt to fit curves to the historic data without predetermined function. In both methods, it is assumed that the historic data used in the analysis is a true representation of the relation between the cost drivers and the corresponding costs. However, because of efficiency variations of the manufacturers and suppliers, changes in supplier selections, market fluctuations, and several other reasons, certain costs in the historic data may be too high whereas other costs may represent better deals for their corresponding cost drivers. Thus, it may be important to rank the historic data and identify benchmarks and estimate the target costs of the product based on these benchmarks. In this paper, a novel adaptation of cost drivers and cost data is introduced in order to use data envelopment analysis for the purpose of ranking cost data and identify benchmarks, and then estimate the target costs of a new product based on these benchmarks. An illustrative case study has been presented for the cost estimation of landing gears of an aircraft manufactured by an aerospace company located in Montreal, CANADA.

  12. The global historical and future economic loss and cost of earthquakes during the production of adaptive worldwide economic fragility functions

    Science.gov (United States)

    Daniell, James; Wenzel, Friedemann

    2014-05-01

    Over the past decade, the production of economic indices behind the CATDAT Damaging Earthquakes Database has allowed for the conversion of historical earthquake economic loss and cost events into today's terms using long-term spatio-temporal series of consumer price index (CPI), construction costs, wage indices, and GDP from 1900-2013. As part of the doctoral thesis of Daniell (2014), databases and GIS layers for a country and sub-country level have been produced for population, GDP per capita, net and gross capital stock (depreciated and non-depreciated) using studies, census information and the perpetual inventory method. In addition, a detailed study has been undertaken to collect and reproduce as many historical isoseismal maps, macroseismic intensity results and reproductions of earthquakes as possible out of the 7208 damaging events in the CATDAT database from 1900 onwards. a) The isoseismal database and population bounds from 3000+ collected damaging events were compared with the output parameters of GDP and net and gross capital stock per intensity bound and administrative unit, creating a spatial join for analysis. b) The historical costs were divided into shaking/direct ground motion effects, and secondary effects costs. The shaking costs were further divided into gross capital stock related and GDP related costs for each administrative unit, intensity bound couplet. c) Costs were then estimated based on the optimisation of the function in terms of costs vs. gross capital stock and costs vs. GDP via the regression of the function. Losses were estimated based on net capital stock, looking at the infrastructure age and value at the time of the event. This dataset was then used to develop an economic exposure for each historical earthquake in comparison with the loss recorded in the CATDAT Damaging Earthquakes Database. The production of economic fragility functions for each country was possible using a temporal regression based on the parameters of

  13. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  14. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    Science.gov (United States)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  15. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  16. From political capitalism to clientelist capitalism? The case of Croatia

    Directory of Open Access Journals (Sweden)

    Denis Redžepagić

    2011-12-01

    Full Text Available The paper analyses the typology of capitalism in Croatia. The Croatian form of capitalism is specific, in form and origin, with links between the pre-independence and post-independence periods, implying that capitalism has gradually evolved – from the political during the eighties towards current clientelistic capitalism. The manufacturing focus aims to facilitate the analysis of institutional, political and economic changes over the past forty years, emphasising the implications of institutional changes which have to a great extent, apart from the war of course, influenced the evolution of capitalism. The paper finds that the transition generated a number of costs, mainly generated by the state (fall in employment, manufacturing and social capital. The claim that the manufacturing industry has inherited low competitiveness neglects the necessary discussion on the role of the state in the formation of industrial policy and market actions. It is also an ex post argument for the claim that restructuring should have been implemented prior to privatisation as this would reduce negative impacts. Institutional changes led to a drastic reduction of the role of the manufacturing sector in the economy. The main finding in this paper is that the change in the interaction between the financial and the real sectors of the economy, the educational system and industrial relations system exposed the vulnerability of the current institutional environment. Despite similarities, institutional advantages of political capitalism are lost in the new type of Croatian capitalism, due to the complexity of the double transition process and the institutional or socio-economic particularities.

  17. Approaches of Russian oil companies to optimal capital structure

    Science.gov (United States)

    Ishuk, T.; Ulyanova, O.; Savchitz, V.

    2015-11-01

    Oil companies play a vital role in Russian economy. Demand for hydrocarbon products will be increasing for the nearest decades simultaneously with the population growth and social needs. Change of raw-material orientation of Russian economy and the transition to the innovative way of the development do not exclude the development of oil industry in future. Moreover, society believes that this sector must bring the Russian economy on to the road of innovative development due to neo-industrialization. To achieve this, the government power as well as capital management of companies are required. To make their optimal capital structure, it is necessary to minimize the capital cost, decrease definite risks under existing limits, and maximize profitability. The capital structure analysis of Russian and foreign oil companies shows different approaches, reasons, as well as conditions and, consequently, equity capital and debt capital relationship and their cost, which demands the effective capital management strategy.

  18. Banks’ Capital and Liquidity Creation

    OpenAIRE

    Horváth, Roman; Seidler, Jakub; Weill, Laurent

    2012-01-01

    This paper examines the relation between banks’ capital and liquidity creation. This issue is of interest to determine the potential impact of higher capital requirements for banks on their liquidity creation, which may have particular importance with new Basel III reform demanding from banks higher capital. We perform Granger-causality tests in a dynamic GMM panel estimator framework on an exhaustive dataset of Czech banks from 2000 to 2010.

  19. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  20. The Acquisition Cost-Estimating Workforce. Census and Characteristics

    Science.gov (United States)

    2009-01-01

    Abbreviations AAC Air Armament Center ACAT acquisition category ACEIT Automated Cost Estimating Integrated Tools AF Air Force AFB Air Force Base AFCAA Air...3 3 4 Automated Cost Estimating Integrated Tools ( ACEIT ) 0 1 12 6 Tecolotea training 0 0 10 5 Other 3 13 24 18 No training 18 4 29 18 Total 100 100...other sources, including AFIT, ACEIT ,9 or the contracting agency that employed them. The remain- ing 29 percent reported having received no training

  1. 48 CFR 2452.216-70 - Estimated cost, base fee and award fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost, base fee... Provisions and Clauses 2452.216-70 Estimated cost, base fee and award fee. As prescribed in 2416.406(e)(1), insert the following clause in all cost-plus-award-fee contracts: Estimated Cost, Base Fee and Award Fee...

  2. Social capital and localised learning

    DEFF Research Database (Denmark)

    Lorenzen, Mark

    2007-01-01

      This conceptual paper analyses why social capital is important for learning and economic development, how it is created and its geography. It argues that with the rise of globalisation and learning-based competition, social capital is becoming valuable because it organises markets, lowering...... business firms' costs of co-ordinating and allowing them flexibly to connect and reconnect. The paper defines social capital as a matrix of various social relations, combined with particular normative and cognitive social institutions that facilitate co-operation and reciprocity, and suggests that social...... capital is formed at spatial scales lower than the national or international, because the density of matrices of social relations increases with proximity. The paper also offers a discussion of how national and regional policies may be suited for promoting social capital....

  3. Counting the cost: estimating the economic benefit of pedophile treatment programs.

    Science.gov (United States)

    Shanahan, M; Donato, R

    2001-04-01

    The principal objective of this paper is to identify the economic costs and benefits of pedophile treatment programs incorporating both the tangible and intangible cost of sexual abuse to victims. Cost estimates of cognitive behavioral therapy programs in Australian prisons are compared against the tangible and intangible costs to victims of being sexually abused. Estimates are prepared that take into account a number of problematic issues. These include the range of possible recidivism rates for treatment programs; the uncertainty surrounding the number of child sexual molestation offences committed by recidivists; and the methodological problems associated with estimating the intangible costs of sexual abuse on victims. Despite the variation in parameter estimates that impact on the cost-benefit analysis of pedophile treatment programs, it is found that potential range of economic costs from child sexual abuse are substantial and the economic benefits to be derived from appropriate and effective treatment programs are high. Based on a reasonable set of parameter estimates, in-prison, cognitive therapy treatment programs for pedophiles are likely to be of net benefit to society. Despite this, a critical area of future research must include further methodological developments in estimating the quantitative impact of child sexual abuse in the community.

  4. Capital requirements for the transportation of energy materials: 1979 ARC estimates. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-28

    TERA's estimates of capital requirements to transport natural gas, crude oil, petroleum products, and coal in the US by 1990 are presented. It is a continuation of a 1978 study (EAPA 5:3946) to perform a similar analysis on 1979 scenarios. Scenarios B, C, and D from the EIA's Mid-range Energy Forecasting Systems, as used in the 1979 Annual Report to Congress (ARC), were provided as a basis for the analysis and represent three alternative futures. Summaries of transportation investment requirements through 1990 are given for Scenarios B, C, and D. Total investment requirements for the three models (pipelines, railroads, waterways) and the three energy commodities (coal, petroleum, petroleum products, natural gas) are estimated to range between $35.3 and $42.7 billion by 1990 depending on the scenario.

  5. Development of regional stump-to-mill logging cost estimators

    Science.gov (United States)

    Chris B. LeDoux; John E. Baumgras

    1989-01-01

    Planning logging operations requires estimating the logging costs for the sale or tract being harvested. Decisions need to be made on equipment selection and its application to terrain. In this paper a methodology is described that has been developed and implemented to solve the problem of accurately estimating logging costs by region. The methodology blends field time...

  6. A generic tool for cost estimating in aircraft design

    NARCIS (Netherlands)

    Castagne, S.; Curran, R.; Rothwell, A.; Price, M.; Benard, E.; Raghunathan, S.

    2008-01-01

    A methodology to estimate the cost implications of design decisions by integrating cost as a design parameter at an early design stage is presented. The model is developed on a hierarchical basis, the manufacturing cost of aircraft fuselage panels being analysed in this paper. The manufacturing cost

  7. Starship Sails Propelled by Cost-Optimized Directed Energy

    Science.gov (United States)

    Benford, J.

    Microwave and laser-propelled sails are a new class of spacecraft using photon acceleration. It is the only method of interstellar flight that has no physics issues. Laboratory demonstrations of basic features of beam-driven propulsion, flight, stability (`beam-riding'), and induced spin, have been completed in the last decade, primarily in the microwave. It offers much lower cost probes after a substantial investment in the launcher. Engineering issues are being addressed by other applications: fusion (microwave, millimeter and laser sources) and astronomy (large aperture antennas). There are many candidate sail materials: carbon nanotubes and microtrusses, beryllium, graphene, etc. For acceleration of a sail, what is the cost-optimum high power system? Here the cost is used to constrain design parameters to estimate system power, aperture and elements of capital and operating cost. From general relations for cost-optimal transmitter aperture and power, system cost scales with kinetic energy and inversely with sail diameter and frequency. So optimal sails will be larger, lower in mass and driven by higher frequency beams. Estimated costs include economies of scale. We present several starship point concepts. Systems based on microwave, millimeter wave and laser technologies are of equal cost at today's costs. The frequency advantage of lasers is cancelled by the high cost of both the laser and the radiating optic. Cost of interstellar sailships is very high, driven by current costs for radiation source, antennas and especially electrical power. The high speeds necessary for fast interstellar missions make the operating cost exceed the capital cost. Such sailcraft will not be flown until the cost of electrical power in space is reduced orders of magnitude below current levels.

  8. BIM – New rules of measurement ontology for construction cost estimation

    Directory of Open Access Journals (Sweden)

    F.H. Abanda

    2017-04-01

    Full Text Available For generations, the process of cost estimation has been manual, time-consuming and error-prone. Emerging Building Information Modelling (BIM can exploit standard measurement methods to automate cost estimation process and improve inaccuracies. Structuring standard measurement methods in an ontologically and machine readable format for a BIM software can greatly facilitate the process of improving inaccuracies in cost estimation. This study explores the development of an ontology based on New Rules of Measurement (NRM for cost estimation during the tendering stages. The methodology adopted is methontology, one of the most widely used ontology engineering methodologies. To ensure the ontology is fit for purpose, cost estimation experts are employed to check the semantics, descriptive logic-based reasoners are used to syntactically check the ontology and a leading 4D BIM modelling software is used on a case study building to test/validate the proposed ontology.

  9. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  10. Thermal and nuclear power generation cost estimates using corporate financial statements

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Nagatomi, Yu; Murakami, Tomoko

    2012-01-01

    There are two generally accepted methods for estimating power generation costs: so-called 'model plant' method and the method using corporate financial statements. The method using corporate financial statements, though under some constraints, can provide useful information for comparing thermal and nuclear power generation costs. This study used this method for estimating thermal and nuclear power generation costs in Japan for the past five years, finding that the nuclear power generation cost remained stable at around 7 yen per kilowatt-hour (kWh) while the thermal power generation cost moved within a wide range of 9 to 12 yen/kWh in line with wild fluctuations in primary energy prices. The cost of nuclear power generation is expected to increase due to the enhancement of safety measures and accident damage compensation in the future, while there are reactor decommissioning, backend and many other costs that the financial statement-using approach cannot accurately estimate. In the future, efforts should be continued to comprehensively and accurately estimate total costs. (author)

  11. Preliminary Cost Estimates for Nuclear Hydrogen Production: HTSE System

    International Nuclear Information System (INIS)

    Yang, K. J.; Lee, K. Y.; Lee, T. H.

    2008-01-01

    KAERI is now focusing on the research and development of the key technologies required for the design and realization of a nuclear hydrogen production system. As a preliminary study of cost estimates for nuclear hydrogen systems, the hydrogen production costs of the nuclear energy sources benchmarking GTMHR and PBMR are estimated in the necessary input data on a Korean specific basis. G4-ECONS was appropriately modified to calculate the cost for hydrogen production of HTSE (High Temperature Steam Electrolysis) process with VHTR (Very High Temperature nuclear Reactor) as a thermal energy source. The estimated costs presented in this paper show that hydrogen production by the VHTR could be competitive with current techniques of hydrogen production from fossil fuels if CO 2 capture and sequestration is required. Nuclear production of hydrogen would allow large-scale production of hydrogen at economic prices while avoiding the release of CO 2 . Nuclear production of hydrogen could thus become the enabling technology for the hydrogen economy. The major factors that would affect the cost of hydrogen were also discussed

  12. Taxation and venture capital-backed entrepreneurship

    DEFF Research Database (Denmark)

    Keuschnigg, Christian; Nielsen, Søren Bo

    2003-01-01

    In recent years, venture capital has increasingly become a factor in thefinancing of new firms. We examine how the value of mature firms determinesthe incentives of entrepreneurs to start up new firms and of venture capitaliststo finance and advise them. We examine how capital gains taxes as well...... assubsidies to start-up costs of new firms affect venture capital-backedentrepreneurship. We also argue that dividend and capital gains taxes onmature firms have important consequences for start-up firms as well.JEL Classification: D82, G24, H24 and H25Keywords: double moral hazard, entrepreneurship, taxes...

  13. Trading Fees and Slow-Moving Capital

    OpenAIRE

    Buss, Adrian; Dumas, Bernard J

    2015-01-01

    In some situations, investment capital seems to move slowly towards profitable trades. We develop a model of a financial market in which capital moves slowly simply because there is a proportional cost to moving capital. We incorporate trading fees in an infinite-horizon dynamic general-equilibrium model in which investors optimally and endogenously decide when and how much to trade. We determine the steady-state equilibrium no-trade zone, study the dynamics of equilibrium trades and prices a...

  14. 12 CFR 932.5 - Market risk capital requirement.

    Science.gov (United States)

    2010-01-01

    ... estimates the market value of the Bank's assets and liabilities, off-balance sheet items, and derivative... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Market risk capital requirement. 932.5 Section... CAPITAL STANDARDS FEDERAL HOME LOAN BANK CAPITAL REQUIREMENTS § 932.5 Market risk capital requirement. (a...

  15. The QUELCE Method: Using Change Drivers to Estimate Program Costs

    Science.gov (United States)

    2016-08-01

    Analysis 4 2.4 Assign Conditional Probabilities 5 2.5 Apply Uncertainty to Cost Formula Inputs for Scenarios 5 2.6 Perform Monte Carlo Simulation to...Distribution Statement A: Approved for Public Release; Distribution is Unlimited 1 Introduction: The Cost Estimation Challenge Because large-scale programs... challenged [Bliss 2012]. Improvements in cost estimation that would make these assumptions more precise and reduce early lifecycle uncertainty can

  16. Cost Estimates for the Decontamination and Decommissioning of Eight ORNL Buildings

    International Nuclear Information System (INIS)

    Hogan, M.

    2006-01-01

    The U.S. Department of Energy's Oak Ridge National Laboratory (ORNL) contains a number of buildings that are antiquated and no longer used. These buildings historically were used for the production of atomic weapons and often remain contaminated with radioactive materials. Certain costs and risks are associated with the long-term stewardship of the buildings. One way to reduce these liabilities is to eliminate the buildings that are no longer in use and are not expected to be used in the future. Some of these buildings at ORNL are located in an area known as 'Isotope Circle'. From this area, eight buildings that are expected to be decontaminated and decommissioned (D and D) in the next five to ten years were chosen to have cost estimates completed. The specific facilities are Buildings 3030, 3031, 3118, 3032, 3033, 3033 Annex, 3034, and 3093. There are many challenges for estimating the costs to D and D buildings potentially contaminated with radionuclides. Each building is unique, has various types and levels of contamination, and (as in this case) often lacks up-to-date information. Because of these limitations, order-of- magnitude cost estimates for each of the eight ORNL buildings were completed using parametric cost modeling software known as RACER TM (Remedial Action Cost Engineering and Requirements System). This type of cost estimate is useful for screening technical concepts and is used for budgetary planning. For the eight buildings evaluated in this study, the total cost to D and D was estimated to be nearly $6 M. This value includes the direct cost of approximately $3.5 M to complete D and D and $2.5 M in cost markups. Also, assuming the actual project does not begin until the year 2010, this total cost is escalated to almost $6.7 M, which accounts for expected inflation. Although the cost estimates in this study were expected to have a wide range in accuracy, there are various factors that could impact these estimates in a negative or positive fashion

  17. A Two-Generation Human Capital Approach to Anti-poverty Policy

    Directory of Open Access Journals (Sweden)

    Teresa Eckrich Sommer

    2018-02-01

    Full Text Available We propose a two-generation anti-poverty strategy to improve the economic fortunes of children in the United States. Our policy bridges two traditionally siloed interventions to boost their impacts: Head Start for children and career pathway training offered through community colleges for adults. We expect that an integrated two-generation human capital intervention will produce greater gains than either Head Start or community college alone for developmental and motivational, logistical and financial, social capital, and efficiency reasons. We suggest a competitive grant program to test and evaluate different models using federal dollars. We estimate average benefit-cost ratios across a range of promising career fields of 1.3 within five years and 7.9 within ten years if 10 percent of Head Start parents participate in two-generation programs.

  18. Estimating two indirect logging costs caused by accelerated erosion.

    Science.gov (United States)

    Glen O. Klock

    1976-01-01

    In forest areas where high soil erosion potential exists, a comparative yarding cost estimate, including the indirect costs determined by methods proposed here, shows that the total cost of using "advanced" logging methods may be less than that of "traditional" systems.

  19. Optimization of temperature differences in a utilizer in relation to the lowest sum of capital and operating cost

    International Nuclear Information System (INIS)

    Kustrin, I.; Tuma, M.

    1992-01-01

    Our environment and nature are currently overburdened with the emission of noxious substances. Steam boilers fired with coal are therefore not very popular. Wherever possible, they are being replaced by devices which are less harmful for the environment because they use different fuel. This paper discusses replacing a steam boiler with a gas turbine and an utilizer. A mathematical model for performing the optimization of capital and operating costs is presented. The model optimizes the degree of preheating of the flue gases i.e. the temperature of the entering flue gases. The smallest temperature difference (pinch point) was not estimated by the pinch technology because the presented example is relatively simple and the pinch point temperature difference was chosen according to the values reported in various literature sources. The optimization is supplemented with an analysis of the thermal and exergetical efficiencies of the utilizer under different conditions (average temperature difference between the hot gases and water or steam, exit temperature of the hot gases), which condition the choice of the type of utilizer

  20. A non-stationary cost-benefit based bivariate extreme flood estimation approach

    Science.gov (United States)

    Qi, Wei; Liu, Junguo

    2018-02-01

    Cost-benefit analysis and flood frequency analysis have been integrated into a comprehensive framework to estimate cost effective design values. However, previous cost-benefit based extreme flood estimation is based on stationary assumptions and analyze dependent flood variables separately. A Non-Stationary Cost-Benefit based bivariate design flood estimation (NSCOBE) approach is developed in this study to investigate influence of non-stationarities in both the dependence of flood variables and the marginal distributions on extreme flood estimation. The dependence is modeled utilizing copula functions. Previous design flood selection criteria are not suitable for NSCOBE since they ignore time changing dependence of flood variables. Therefore, a risk calculation approach is proposed based on non-stationarities in both marginal probability distributions and copula functions. A case study with 54-year observed data is utilized to illustrate the application of NSCOBE. Results show NSCOBE can effectively integrate non-stationarities in both copula functions and marginal distributions into cost-benefit based design flood estimation. It is also found that there is a trade-off between maximum probability of exceedance calculated from copula functions and marginal distributions. This study for the first time provides a new approach towards a better understanding of influence of non-stationarities in both copula functions and marginal distributions on extreme flood estimation, and could be beneficial to cost-benefit based non-stationary bivariate design flood estimation across the world.