  1. Functional testing of a fish sluice, Buchholz small hydro plant - Final report; Funktionskontrolle Fischschleuse, KWKW Buchholz - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ruhle, Ch. [Buero fuer Jagd- und Fischereifragen, Schmerikon (Switzerland); Scherrer, I. [Entegra Wasserkraft AG, St. Gallen (Switzerland)

    2009-01-15

    Since more than 100 years the diversion hydropower plant of Buchholz at the river Glatt (canton Saint Gall) has been out of operation. With its reactivation as run-of-river scheme, the river meadow, originated due to sedimentation in the former storage basin, with its beaver habitat, could be preserved. For the first time in Switzerland, a fish lock was implemented for the upstream passage way for fish. The fish lock was built directly into for stability reasons newly constructed secondary concrete at the downstream side of the old dam. At the upper lock opening a weir basked is installed, where the migrating fish are recorded. The examination proofed that the fish lock in principle is working for strong swimming fish species (qualitative proof of the performance control). In case of flood caused drift, the migrating fish seem to accept the fish passage. The attempt to quantify the proportion of the migrating willing fish which actually swim through the lock (quantitative proof of the performance control) did not produce satisfactory results. (authors)

  2. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  3. Assessment of small versus large hydro-power developments - a Norwegian case study

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Harby, Atle

    2010-07-01

    Full text: The era of new, large hydro-power development projects seems to be over in Norway. Partly as a response to this, a large number of applications for the development of smallscale hydro power projects up to 10 MW overflow the Water Resources and Energy Directorate, resulting in an extensive development of small tributaries and water courses in Norway. This study has developed a framework for the assessment and comparison of several small versus many large hydro-power projects based on a multi-criteria analysis (MCA) approach, and further tested this approach on planned or developed projects in the Helgeland region, Norway. Multi-criteria analysis is a decision-support tool aimed at providing a systematic approach for the comparison of various alternatives with often non-commensurable and conflicting attributes. At the same time, the technique enables complex problems and various alternatives to be assessed in a transparent and simple way. The MCA-software was in our case equipped with 2 overall criteria (objectives) with a number of sub criteria; Production with sub-criteria like volume of energy production, installed effect, storage capacity and economical profit; Environmental impacts with sub-criteria like fishing interests, biodiversity, protection of unexploited nature The data used in the case study is based on the planned development of Vefsna (large project) with the energy/effect production estimated and the environmental impacts identified as part of the feasibility studies (the project never reached the authorities' licensing system with a formal EIA). The small-scale hydro-power projects used for comparison are based on realized projects in the Helgeland region and a number of proposed projects, up scaled to the size of the proposed Vefsna-development. The results from the study indicate that a large number of small-scale hydro-power projects need to be implemented in order to balance the volume of produced electricity/effect from one

  4. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  5. Transformer Protection by Using FL Based Artificial Intelligent Buchholz Relay against Incipient Faults

    OpenAIRE

    SOUMYADEEP SAMONTO; SAGARIKA PAL; SUBRATA BANERJEE; BISHAL SARKAR

    2016-01-01

    Switchgear and Protection are the two vital terminology of Electrical power system. Normally the components of any switchgear needs better protection schemes to be set for a composite power system. Many explorers worked on artificial intelligent breaker but an indulgence of fuzzy theory is nevertheless very absent in case of buchholz relay. Here in this paper discussion has been drawn in favor of the Artificial Intelligent Buchholz (AIB) relay where inputs are level of transformer oil and ...

  6. The contribution of small hydro power stations to the electricity generation in Greece: Technical and economic considerations

    International Nuclear Information System (INIS)

    Kaldellis, J.K.

    2007-01-01

    Hydropower is the most widely used renewable energy source worldwide, contributing almost with 18.5% to the fulfillment of the planet electricity generation. However, most locations in Europe appropriate for the installation of large hydro power stations have already been exploited. Furthermore, there is a significant local communities' opposition towards new large power stations; hence, small hydro power stations remain one of the most attractive opportunities for further utilization of the available hydro potential. Greece and more precisely the country's mainland possesses a significant hydro-power potential which is up to now only partially exploited. In parallel, a large number of private investors have officially expressed their interest in creating small hydro power stations throughout the country, encouraged by the significant Greek State subsidy opportunities for renewable energy applications. However, up to now a relatively small number of projects have been realized, mainly due to decision-making problems, like the administrative bureaucracy, the absence of a rational national water resources management plan and the over-sizing of the proposed installations. Certainly, if the above problems are suitably treated, small hydro-power plants can be proved considerably profitable investments, contributing also remarkably to the national electricity balance and replacing heavy polluting lignite and imported oil. In the context of the above interesting issues, the present study reviews in detail the existing situation of small hydropower plants in Greece and investigates their future prospects as far as the energy, economic and environmental contribution are concerned

  7. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  8. Vaksvikelva small hydro

    OpenAIRE

    Loe, Daniel Aarset

    2017-01-01

    Norway is in constant need of renewable energy, and hydroelectric power is still the main source. A great future potential can be found in countless small rivers scattered across the country, which could be developed through small hydro projects. In the process of converting mechanical movement - flowing water - into electric energy, about 5% turns into heat. From a power plant with an annual production of 15 GWh, this means energy enough to heat approximately 30 households is lost. In my pro...

  9. Small hydro plant- present scenario and future prospects

    International Nuclear Information System (INIS)

    Purohit, D.P.

    1996-01-01

    The article, deals with the methodology of power generation by small hydro power resources, especially in the Himalayan and sub Himalayan regions and the benefits it will bestow to the inhabitants of this region. The development of small hydro power projects in the Himalayas and sub Himalayas would serve as a model for environment- friendly sources of energy to benefit small communities world wide. The use of water turbine generators for the generation of cheaper power is also discussed. 4 refs

  10. Fouling in small hydro projects; Verschmutzung von Kleinwasserkraftwerken - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Abgottspon, A.; Staubli, T.

    2010-03-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at fouling problems encountered in small hydro installations. The report is based on ten interviews made with operators of small hydro power stations in Switzerland. A parallel project carried out in Germany is mentioned. A large variation in the degree of fouling in the various hydro power stations is noted. Sources such as leaves in autumn and algae are discussed, as are the various rinsing procedures used to clear the turbines of fouling. Power losses are discussed and measures that can be taken to prevent fouling are described. Measurements made at an installation in Freienstein, Switzerland, are presented and discussed. The report is completed with an appendix containing calculations, details on the Freienstein power plant and the results of interviews made with the ten hydro power installations examined.

  11. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  12. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  13. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  14. The application of the EMAS-ordinance to small hydro-power-plants

    International Nuclear Information System (INIS)

    Patek, R.

    2000-01-01

    The application of the eco-management and audit scheme ordinance to small hydro-power-plants deals with the possibility to take an environmental-relevant audition on sites of small hydro-power-plants to achieve the environmental EMAS-certificate. Within the realization of the acquired improvement steps also the efficiency of the power plants should be increased that the audit also becomes interesting in economic matters. Contents: after explaining the legal frame being prescribed by the European Community, its interpretation and relevance for the sites of SHP, common impacts of these on the environment are particularized. From these facts a valuation-catalogue has been developed, which will be used by the power plant-owners for the assessment of their sites to take part in the EMAS-system. This catalogue is split up into six modules, which comprise all possible valuation areas which can appear concerning the different kinds of plants. These modules are: MODUL A: backwater area; MODUL B: weir; MODUL C: powerhouse; MODUL D: tail water area; MODUL E: diversion channel / penstock; MODUL F: diversion section. Furthermore three submodules to gather common data concerning plant and river have been created. At the development of the catalogue there was particularly attached importance to a user-friendly application. The goal was to realize the valuation by the plant owners to minimize costs. To take objectiveness into account the module-catalogue was created in a way that auditors (the power plant owners) must not formulate specifications by themselves; the possible assessments only have to be marked with a cross at the corresponding parameters, which have been listed up. (author)

  15. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  16. An approach to the investment analysis of small and medium hydro-power plants

    International Nuclear Information System (INIS)

    Forouzbakhsh, F.; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in 'Bookan, Iran' and SHPP in 'Nari, Iran'), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially

  17. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  18. An approach to the investment analysis of small and medium hydro-power plants

    Energy Technology Data Exchange (ETDEWEB)

    Forouzbakhsh, F. [University of Tehran (Iran). Faculty of Engineering; Hosseini, S.M.H. [Islamic Azad University, Tehran (Iran). Faculty of Engineering; Vakilian, M. [Sharif Institute of Technology, Tehran (Iran). Faculty of Electrical Engineering

    2007-02-15

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Since a large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments, however it is possible to finance these infrastructure plants by assigning these affairs to private sectors by using build operate transfer (BOT) method, which is quite well-known all around the world. This paper reviews the structure of BOT contracts and through an economic evaluation based on different percentage of investments of private sector in providing the expenses of small and medium hydro-power plants (S and M-HPP) (e.g. MHPP in ''Bookan, Iran'' and SHPP in ''Nari, Iran''), demonstrates that by increasing the percentage the share of the private sector in the investment, the economic indices B/C and NPV improve substantially. (author)

  19. The development of small-hydro in China; Le developpement de la petite hydraulique en Chine

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, X. [United Nations Environment Programme, Riso (Denmark); Pan, J. [Chinese Academy of Social Sciences (China). Research Centre for Economic Development

    2007-04-15

    Small hydro is a renewable source of energy that is economically and technically viable. This article described China's investment in small-scale hydroelectric power plants in 1,600 remote communities. Seventy per cent of China's small hydro power stations are concentrated in remote impoverished communities. These power stations provide electricity to 300 million people in China, where half of the territories, one third of the districts and towns, and one quarter of the population depend primarily on this energy source for their electricity needs. The first power station was built in the province of Yunnan in 1912, but the real development of small hydro occurred after 1950, and can be divided into three phases. Phase 1 occurred before 1980 when small hydro power stations concentrated on providing electricity for lighting in rural areas as well as for transforming agriculture and irrigation. For many decades following the foundation of the Republic of China, rural areas did not have access to electricity or had serious shortages of electricity. In order to ensure electricity in isolated and remote areas, the Chinese government requested that local authorities build and exploit small hydro where conditions were favourable, and this while respecting water resources. Phase 2 occurred between 1980s and 1990s, with a focus on improving the performance of small hydro power stations to include electricity provisions for local enterprises. During phase 2, small hydro became a tool for dynamic rural development for farmers to increase their revenues. The latest phase in small hydro development has also helped reduce poverty and develop local economies, but in addition, it plays a role in the long term protection of ecosystems, the environment and rural modernization. Today 660,000 people work for small power stations and most are employed locally. Replacing firewood with electricity has saved 130,000 hectares of forested land and helped protect ecosystems. Small

  20. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  1. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland

    International Nuclear Information System (INIS)

    2008-05-01

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18 th century. A permanent license to use at most 3 m 3 /s is available. The study concludes that the maximum flow rate of 6 m 3 /s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m 3 /s.

  2. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  3. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    Energy Technology Data Exchange (ETDEWEB)

    Huertas-Hernando, Daniel [Department of Energy Systems, SINTEF, Trondheim Norway; Farahmand, Hossein [Department of Electric Power Engineering, Norwegian University of Science and Technology (NTNU), Trondheim Norway; Holttinen, Hannele [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Kiviluoma, Juha [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Rinne, Erkka [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Söder, Lennart [Department of Electrical Engineering, KTH University, Stockholm Sweden; Milligan, Michael [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Ibanez, Eduardo [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Martínez, Sergio Martín [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Gomez-Lazaro, Emilio [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Estanqueiro, Ana [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Rodrigues, Luis [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Carr, Luis [Research Association for Energy Economics (FfE GmbH), Munich Germany; van Roon, Serafin [Research Association for Energy Economics (FfE GmbH), Munich Germany; Orths, Antje Gesa [Energinet.dk, Fredericia Denmark; Eriksen, Peter Børre [Energinet.dk, Fredericia Denmark; Forcione, Alain [Hydro Quebec, Montréal Canada; Menemenlis, Nickie [Hydro Quebec, Montréal Canada

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

  4. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  5. Parametric distribution approach for flow availability in small hydro potential analysis

    Science.gov (United States)

    Abdullah, Samizee; Basri, Mohd Juhari Mat; Jamaluddin, Zahrul Zamri; Azrulhisham, Engku Ahmad; Othman, Jamel

    2016-10-01

    Small hydro system is one of the important sources of renewable energy and it has been recognized worldwide as clean energy sources. Small hydropower generation system uses the potential energy in flowing water to produce electricity is often questionable due to inconsistent and intermittent of power generated. Potential analysis of small hydro system which is mainly dependent on the availability of water requires the knowledge of water flow or stream flow distribution. This paper presented the possibility of applying Pearson system for stream flow availability distribution approximation in the small hydro system. By considering the stochastic nature of stream flow, the Pearson parametric distribution approximation was computed based on the significant characteristic of Pearson system applying direct correlation between the first four statistical moments of the distribution. The advantage of applying various statistical moments in small hydro potential analysis will have the ability to analyze the variation shapes of stream flow distribution.

  6. Preliminary study on the reactivation of the WERAP small hydro power station in Bubikon

    International Nuclear Information System (INIS)

    Bretscher, A.; Gutzwiller, S.

    2003-01-01

    This study on the revitalisation of a small hydro power station belonging to old spinning mill in Bubikon, Switzerland, proposes ideas for the reactivation of an old hydropower installation that once helped power a spinning mill. Details are given on the history of the mill and the hydrological conditions to be expected at the site. Three variants are proposed for the refurbishment, including the revision of the power station's existing 44 kW Francis turbine dating from 1908, the addition of further, similar Francis turbine or its replacement with a new 61 kW Francis turbine. The costs and amortisation of the refurbishment variants are examined, the revenues that can be expected from its operation and other financial factors are discussed. Further, environmental and legal aspects of the project are examined and suggestions are made for the next steps to be taken towards the realisation of this small hydropower plant. An annex provides photographs of the location and the power station's equipment

  7. Rebuilding the Chalberhoeni small hydro power station in Saanen, Switzerland; Chalberhoeni - Rapport Final

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-07-01

    These two final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of the Chalberhoeni small hydro project in Saanen, Switzerland. The first report presents data on the catchment area involved, available head, residual water quantities, installed power and annual production figures. Investments and operating costs are looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues.

  8. Micro-hydro power: reviewing an old concept

    Energy Technology Data Exchange (ETDEWEB)

    Alward, R.; Eisenbart, S.; Volkman, J.

    1979-01-01

    This informaion package has been prepared to respond to an increasing number of requests for information on micro-hydro systems. It contains a resource directory, which is an attempt to put the reader in contact with the literature, plans, people, and companies appropriate to needs. On a world-wide basis, small-scale, environmentally benign, mechanical, and electrical hydropower systems are common. These are the systems for individual homes, farm, and shop use and generally have power outputs less than 100 kW. For convenience in terminology, this scale of hydro power is referred to as micro-hydro. A decision tree is first presented followed by information on determining the suitability of th site, equipment, economics, sources for financial assistance, regulatory conflicts, cautions and suggestions for the Do-It-Yourselfer, and the Self-Installer, manufacturers and suppliers, and sources of professional services. An annotated bibliography of 16 references is provided. (MCW)

  9. Cost determination of the electro-mechanical equipment of a small hydro-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ogayar, B.; Vidal, P.G. [Grupo de Investigacion IDEA, Escuela Politecnica Superior, University of Jaen, Campus de Las Lagunillas, s/n. 23071-Jaen (Spain)

    2009-01-15

    One of the most important elements on the recovery of a small hydro-power plant is the electro-mechanical equipment (turbine-alternator), since the cost of the equipment means a high percentage of the total budget of the plant. The present paper intends to develop a series of equations which determine its cost from basic parameters such as power and net head. These calculations are focused at a level of previous study, so it will be necessary to carry out the engineering project and request a budget to companies specialized on the construction of electro-mechanical equipment to know its cost more accurately. Although there is a great diversity in the typology of turbines and alternators, data from manufacturers which cover all the considered range have been used. The above equations have been developed for the most common of turbines: Pelton, Francis, Kaplan and semiKaplan for a power range below 2 MW. The obtained equations have been validated with data from real installations which have been subject to analysis by engineering companies working on the assembly and design of small plants. (author)

  10. Small hydro: Policy and potential in Spain

    International Nuclear Information System (INIS)

    Gutierrez, C.

    2001-01-01

    In Spain, the benefits of small-scale (less than 10 MW) hydro are apparently rarely appreciated and there is little support from European institutions. The article suggests that small hydro technology can make a significant contribution to the country's energy requirements and create employment, provided certain obstacles can be removed. Data on the number of small hydros in Spain, and of recent installations are given; the share of hydro in Spain's total energy production is 2.5%. The low environmental impact of hydro is extolled, and the conclusions of a recent study of 'environmental impacts of the production of electricity' are listed. There are said to be unreasonable administrative obstacles; for example, it is more difficult to obtain permission to refurbish a 100 kW hydro plant in Castilla y Leon than it is to install a 30,000 kW gas plant. Some details relating to the affect of hydro on aquatic ecosystems, noise levels, and water quality, are given

  11. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  12. Staatschuld, Verfassung und Revolutionsprävention: Friedrich Buchholz und der Beginn der Sozialwissenschaft

    Directory of Open Access Journals (Sweden)

    Axel Rüdiger

    2011-09-01

    Full Text Available From within the environment of the Prussian reforms at the beginning of the 19th century, FriedrichBuchholz developed the social-scientific concept of Zukunftspolitik, which deals with the constitutionalsafeguard of public credit and the prevention of destructive revolution through targetedpolitical reforms. In contrast to political romanticism (Adam Müller and others, Buchholz orientshimself not toward the English system of representation, but toward the French model, to combinerevolutionary popular sovereignty with representative government. Using the example of Englishpublic debt in the 18th century, he develops the political dialectic of materialist necessity and arbitrarycontingency. Whereas sovereignty without representation in the maintenance of public creditinevitably leads to Jacobin Terror, parliamentarian representation without sovereignty leads to, inthe English model, a general state of war. Europe’s future, according to Buchholz, thus depends onthe reform of English Parliamentarianism.

  13. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  14. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  15. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  16. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  17. Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant

    International Nuclear Information System (INIS)

    Regula, E.

    2005-01-01

    In this paper thirty years history of the Hydro-engineering structure and Liptovska Mara Pumped Storage Power Plant (PSPP) is presented. In 1975 year the Liptovska Mara PSPP was commissioned. There are 2 Kaplan turbines and 2 Derezias reversible turbines with a total installed power 198 MW. The average annual output is 134.5 GWh. As a part of this hydro-engineering structure is Besenova Small-scale power plants with 2 turbines and with installed power 4.64 MW. The average annual output consists 18.3 GWh. There up to end of 2004 year 3,620.172 MWh of electricity was produced. Environmental effects are discussed

  18. Analysis of the potential of small hydro-power installations - Preliminary study on hydro-power schemes on rivers; Programm Kleinwasserkraftwerke. Potenzialanalyse Kleinwasserkraftwerke - Vorstudie zu Kraftwerken an Fliessgewaessern

    Energy Technology Data Exchange (ETDEWEB)

    Baur, M.; Dettli, R. [econcept AG, Zuerich (Switzerland); Weingartner, R.; Viviroli, D.; Imhof, P.; Faessler, M.; Gerhardinger, H. [University of Berne, Geographisches Institut, Gruppe fuer Hydrologie (GIUB), Berne (Switzerland)

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results obtained from an analysis of the potential of small hydro-power installations in Switzerland. The current situation is reviewed and a 'bottom-up' analysis of the potential available is made. Data is presented on the potential of installations with power-ratings above and below 300 kW. Cantonal case-studies are examined. In a further 'top-down' examination, flow-rates and height-differences are looked at. The development of a 'potential-map' for Switzerland is described. The report is completed with the presentation of the conclusions made from the work. Suggestions for further work that could be done on the subject are made.

  19. Small hydro takes stock of a dozen years of activity

    International Nuclear Information System (INIS)

    Leutwiler, H.

    2000-01-01

    This short article discusses a survey that takes stock of the investments made in small hydro schemes in Switzerland since 1985 and the structural changes in this area that have occurred. Typical figures are given for investments and the increase in energy production that have resulted. The various possibilities for the realisation of small hydro installations are discussed including pressure-reduction turbines, the use of turbines in drinking water and wastewater systems. The importance of the sale of the electricity thus generated as 'green' power is noted. The potential of this form of electricity generation in a liberalised electricity market and the obstacles placed in its way are discuss

  20. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  1. Island operation - modelling of a small hydro power system

    Energy Technology Data Exchange (ETDEWEB)

    Skarp, Stefan

    2000-02-01

    Simulation is a useful tool for investigating a system behaviour. It is a way to examine operating situations without having to perform them in reality. If someone for example wants to test an operating situation where the system possibly will demolish, a computer simulation could be a both cheaper and safer way than to do the test in reality. This master thesis performs and analyses a simulation, modelling an electronic power system. The system consists of a minor hydro power station, a wood refining industry, and interconnecting power system components. In the simulation situation the system works in a so called island operation. The thesis aims at making a capacity analysis of the current system. Above all, the goal is to find restrictions in load power profile of the consumer, under given circumstances. The computer software used in simulations is Matlab and its additional program PSB (Power System Blockset). The work has been carried out in co-operation with the power supplier Skellefteaa Kraft, where the problem formulation of this master thesis was founded.

  2. The 'Lehn' small hydro-power station; KWKW Lehn Vorprojekt - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ruff, H.; Widmer, P.

    2009-02-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) takes a look at the refurbishment of a small hydro-power station in the UNESCO biosphere region in the Entlebuch, Switzerland. The five grounds for the refurbishment are examined - repair of the water intake, flood protection, regulation of residual water, reduction of floating debris and sand and optimisation of the system by using automatic control. Figures on the cost of the refurbishment and electricity production are presented and discussed, as is the economic viability of the project. The existing installations are described and the hydrology of the stream is discussed, as are legal requirements and technical basics. Variants for the refurbishment are examined and operational aspects are looked at. A comprehensive appendix provides details on the proposal in graphical and tabular form.

  3. The Nothuesli small hydro project; Wasserkraftwerk Nothuesli, Gonzenbaechli - Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Balachandran, S.; Jorde, K.

    2008-07-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  4. A case study of small hydro and grid extension for rural electrification alternatives and complementarities

    International Nuclear Information System (INIS)

    Tebicke, H.L.; Mariam, H.G.

    1990-01-01

    This paper reports that rural electrification in Eastern and Southern African Countries (ESAC) has so far been based largely on stand-alone diesel electric generating plant or on the extension of high-voltage transmission grids fed by large hydro and/or thermal electric generating stations. The alternative of furnishing supply at modest investment and competitive cost from a nearby small- hydro plant has rarely been considered in those countries of the sub-region that have ample hydro-power resources. All countries in the sub-region (except Angola) import petroleum and/or petroleum product supplies, as well as all hardware for electricity supply and utilization. As a result, in most countries an acute shortage of foreign exchange severely hampers implementation of rural electrification schemes. This should turn attention increasingly to strategies which are less capital-intensive and less dependent on foreign exchange, such as small-hydro plants, where the resource is located near to rural demand. Increasing the local content of small-hydro project implementation has paid off in recent years, considerably reducing costs in a number of Asian and Latin American projects. Local contributions have taken the form of resource assessment at a particular site, design, construction works, and fabrication of relatively simple components of power plant such as hydraulic equipment, low pressure penstocks and gates, as well as simpler types of turbines (e.g., the Banki type). Inadequacy of indigenous technical capacity to make similar local contributions in the ESAC has meant that the few recent small-hydro projects have relied on importing both expertise and equipment. The high costs resulting have frequently fueled arguments against pursuit of small-hydro projects

  5. An approach to the investment analysis of small and medium hydro-power plants

    DEFF Research Database (Denmark)

    Forouzbakhsh, Farshid; Hosseini, S.M.H.; Vakilian, M.

    2007-01-01

    Hydro-power plants, as a part of infrastructure projects, play an important role in the economic-social development of countries. Sincea large amount of investment is needed for construction of these power plants, which appeared to be an obstacle in these developments,however it is possible...

  6. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  7. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  8. OVERVIEW OF A NEW METHOD FOR DESIGNING HIGH EFFICIENCY SMALL HYDRO POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Milun Babić

    2010-01-01

    Full Text Available Significant number of research projects in the area of renewable energy sources (especially for small hydro power plants has been made within the Department for Energy and Process Engineering and Regional Euro Energy Efficiency Center at Faculty of Mechanical Engineering (University of Kragujevac, Serbia since early eighties. The results are various; numerous domestic and international recognition and technical performance tell about the success of the research. Research projects have been following the technical and technological development of research equipment and economy growth. This has led to the development of software for designing turbines of SHP plants. In order to notify the public about possibilities of our software, in this paper is briefly described a mathematical model and procedures for calculating and designing of SHPP for known conditions. As an argument for assessing the validity and potential of our research results is shown constructed SHP plant "Bosnia 1", 2 x 100 kW power.

  9. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  10. Hydro power plants, an overview of the current types and technology

    Directory of Open Access Journals (Sweden)

    Tkáč Štefan

    2018-03-01

    Full Text Available Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  11. Hydro power plants, an overview of the current types and technology

    Science.gov (United States)

    Tkáč, Štefan

    2018-03-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  12. Small hydro power project operating in cascade; Projeto de pequenas centrais hidreletricas operando em cascata

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Robson Siqueira Filadelfo dos [Minas Gerais Univ., Belo Horizonte (Brazil). Dept. de Engenharia Nuclear; Martinez, Carlos Barreira; Macedo, Alberto Amarante [Minas Gerais Univ., Belo Horizonte (Brazil). Dept. de Engenharia Hidraulica e Recursos Hidricos

    1999-07-01

    Small Hydro Power is a good option of generation mainly when they are located close to the consumers, because they demand smaller absolute value of invested capital and smaller time of maturation. Besides, the great repressed demand, mainly in the schedules of point, and the recovery of the values of the tariffs has been showed to private investor for this type of central. This paper develops a new method that allows to give agility to the study of small hydropower operating in cascade form in order to optimize the cost-benefit relationship of the enterprise. Approaches are presented for the evaluation of this type of system, the methodology of partition of falls and the proposed model. A case study, in which this method is applied, is shown at the end of this work. (author)

  13. Small hydro in Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2011-10-01

    Full Text Available hydro, the author has started an online database of small hydropower projects in eastern and southern Africa. The main aim of the database is to catalogue the current situation and to make that accessible to policymakers, project developers, as well...

  14. The Meielsgrund and Turbach small hydro power stations in Saanen, Switzerland; PCH du Meielsgrund et PCH de Turbach - Rapports finaux

    Energy Technology Data Exchange (ETDEWEB)

    Cavin, G. [Stucky SA, Renens (Switzerland); Wagner, T. [Sigmaplan, Berne (Switzerland)

    2009-12-15

    These four final illustrated reports for the Swiss Federal Office of Energy (SFOE) deal with various aspects of two small hydro projects on two affluents of the river Saane in Switzerland. The first report presents two variants for the enhancement of the existing Meielsgrund installation as well as a new, parallel installation. The catchment area involved, available head, residual water quantities, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. The second report describes the project and discusses regional planning aspects, hydrological basics and environmental issues in connection with the renewal project, including details on invertebrates found in the stream and their relevance to fishing and nature protection issues. The third and fourth reports concern the Turbach small hydro installation. The topics discussed in these two reports are basically similar to those considered for the Meielsgrund installation.

  15. Optimal Sizing Of An Off-Grid Small Hydro-Photovoltaic-Diesel Generator Hybrid Power System For A Distant Village

    Directory of Open Access Journals (Sweden)

    Adebanji B.

    2017-08-01

    Full Text Available This paper presented an optimal sizing technique for an off-grid hybrid system consisting of Small Hydro SHP system Photovoltaic PV modules Battery BATT banks and Diesel Generator DG. The objective cost function Annualized Cost System and the Loss of Power Supply Probability LPSP were minimized with application of Genetic Algorithm GA in order to reduce the Cost of Energy COE generation. GA compared to other convectional optimization methods has the ability to attain global optimum easily. The decision variables are the number of small hydro turbines NSHP number of solar panels NPV number of battery banks NBATT and the capacity of DG PDG. The proposed method was applied to a typical rural village Itapaji-Ekiti in Nigeria. The monthly average solar irradiance data were converted into hourly solar irradiance data for uniformity. Sensitivity analysis was also performed to identify the most important parameter influencing the optimized hybrid system. The optimal sizing result of the HPS is 954 kW of SHP 290 kW of PV panels 9500 sets of 600Ah battery strings and 350 kW of DG. The optimal Loss of Power Supply Probability LPSP is 0.0054 and the Renewable Fraction RF is 0.62 which is indeed a significant improvement on the environment and comparatively better than any other combinations in the system.

  16. Gross greenhouse gas fluxes from hydro-power reservoir compared to thermo-power plants

    International Nuclear Information System (INIS)

    Santos, Marco Aurelio dos; Pinguelli Rosa, Luiz; Sikar, Bohdan; Sikar, Elizabeth; Santos, Ednaldo Oliveira dos

    2006-01-01

    This paper presents the findings of gross carbon dioxide and methane emissions measurements in several Brazilian hydro-reservoirs, compared to thermo power generation. The term 'gross emissions' means gas flux measurements from the reservoir surface without natural pre-impoundment emissions by natural bodies such as the river channel, seasonal flooding and terrestrial ecosystems. The net emissions result from deducting pre-existing emissions by the reservoir. A power dam emits biogenic gases such as CO 2 and CH 4 . However, studies comparing gas emissions (gross emissions) from the reservoir surface with emissions by thermo-power generation technologies show that the hydro-based option presents better results in most cases analyzed. In this study, measurements were carried in the Miranda, Barra Bonita, Segredo, Tres Marias, Xingo, and Samuel and Tucurui reservoirs, located in two different climatological regimes. Additional data were used here from measurements taken at the Itaipu and Serra da Mesa reservoirs. Comparisons were also made between emissions from hydro-power plants and their thermo-based equivalents. Bearing in mind that the estimated values for hydro-power plants include emissions that are not totally anthropogenic, the hydro-power plants studied generally posted lower emissions than their equivalent thermo-based counterparts. Hydro-power complexes with greater power densities (capacity/area flooded-W/m 2 ), such as Itaipu, Xingo, Segredo and Miranda, have the best performance, well above thermo-power plants using state-of-the-art technology: combined cycle fueled by natural gas, with 50% efficiency. On the other hand, some hydro-power complexes with low-power density perform only slightly better or even worse than their thermo-power counterparts

  17. Replacement of the Farbtobel hydro power installation in Peist, Switzerland; Gemeinde Peist (GR). Neubau Wasserkraftwerk Farbtobel - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Scherrer, I.; Gadient, N.

    2009-12-15

    This illustrated report for the Swiss Federal Office of Energy (SFOE) deals with various aspects of a small hydro project in Peist, Switzerland. The report presents a project concerning the replacement of the existing Farbtobel small hydro installation. The catchment area involved, its hydrology, high-water considerations and river ecology are examined. The power station concept, installed power and annual production figures are discussed. Investments, operating costs and financial viability are also looked at. Remuneration for the power produced through the Swiss cost-covering remuneration scheme is discussed.

  18. Hydro turbine governor’s power control of hydroelectric unit with sloping ceiling tailrace tunnel

    Science.gov (United States)

    Fu, Liang; Wu, Changli; Tang, Weiping

    2018-02-01

    The primary frequency regulation and load regulation transient process when the hydro turbine governor is under the power mode of hydropower unit with sloping ceiling tailrace are analysed by field test and numerical simulation in this paper. A simulation method based on “three-zone model” to simulate small fluctuation transient process of the sloping ceiling tailrace is proposed. The simulation model of hydraulic turbine governor power mode is established by governor’s PLC program identification and parameter measurement, and the simulation model is verified by the test. The slow-fast-slow “three-stage regulation” method which can improve the dynamic quality of hydro turbine governor power mode is proposed. The power regulation strategy and parameters are optimized by numerical simulation, the performance of primary frequency regulation and load regulation transient process when the hydro turbine governor is under power mode are improved significantly.

  19. Realising the potential for the protection of the environment by developing small hydro power

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, R.; Heal, A.

    2000-07-01

    The RAPPIDS project was set up to tackle the conflicts arising from the development of Small Hydro Power (SHP) in sensitive and fragile environments. The project was focused on Snowdonia National Park, which was identified as a conflict area in the UK. The aim was to develop a strategy to overcome these conflicts locally through: improving the understanding of market actors, of the effects of SHP on the environment; improving dialogue between market actors; initiating collaboration to analyse the environmental impacts and test innovative technological measures for sensitive SHP development; Identifying successful environmental measures and assessing their suitability for transfer to other regions; raising the awareness of market actors, of the environmental benefits of SHP. The project in the UK was mirrored in 2 regions of Europe, under the EU Altener programme, and lessons learnt were shared between regions. (author)

  20. Small-scale hydro-power plant in Anzonico - Preliminary project; Progetto microcentrale idroelettrica, Anzonico. Programma Centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant in the municipality of Anzonico, southern Switzerland. The water of a small alpine stream is to be used for power generation and vineyard irrigation as well as for the creation of an additional water resource for fire fighting in this sensitive region. The report is foreseen to support the request for a water usage concession to the authorities of the Canton of Ticino. It presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as is the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project. Synergies exist with the local electricity utility that will renew and improve its power distribution and telecommunication system when the penstock will be mounted in the underground.

  1. Some impacts and mitigations for small hydro developments in Newfoundland and Labrador

    International Nuclear Information System (INIS)

    Buchanan, R.

    1993-01-01

    Potential adverse impacts of small hydro power plants were defined and some of the mitigative techniques that can be used to eliminate or alleviate these impacts were outlined. Potential adverse impacts involved in the construction of hydro projects were identified as those associated with construction of dams, borrow areas, access roads, powerhouses, canals, penstocks, and transmission lines. Fish passage and fish habitat maintenance were also among the major issues that confront most of the proposed small hydro projects in Newfoundland. Fish passage and habitat issues received particular attention in view of their obvious importance in a province where fishing is a way of life for large segments of the population. Major challenges included both upstream and downstream fish passage, and maintenance flows downstream of dams. Upstream migration could be facilitated by fishways. Downstream migration of Atlantic salmon smolts was said to be more problematic, but could be addressed by strategies such as intake design, screens, bypasses, sluices, turbine selection, plant shutdowns at critical times and operation of turbines at peak efficiencies. 12 refs., 2 tabs

  2. An overview on small hydro in Brazil

    International Nuclear Information System (INIS)

    Filho, G.T.

    2008-01-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km 2 . It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  3. Small hydro in Ukraine: To invest or not to invest?

    Energy Technology Data Exchange (ETDEWEB)

    Loechen, Liv Arntzen

    2011-07-01

    The vast and unexploited renewable energy potential and the introduction of green tariffs in 2009 have made Ukraine an attractive location for investors within the renewable energy sector. The Green Tariff system offers developers and investors the highest feed-in tariffs in Eastern Europe, and thus far covers alternative energy production from biomass, biogas, wind power plants and hydropower plants. Ukraine has a history in both large- and small hydro production. Whereas the potential of the country's big rivers is now to a great extent exploited, this is not the case for the smaller watercourses. Ukraine is well endowed with small rivers, approximately 60,000 of which can be classified as 'very small'. Most of these are located in the western part of the country, near the Carpathian Mountains. However, despite the natural potential, foreign investors should be aware of the potential risks and hurdles. The country has a huge problem with corruption, and the process of obtaining licenses is not straight forward. On the whole, it can be worthwhile exploring the possibilities of small hydro production in Ukraine for those who can deal with a high level of risk and uncertainty. If not, one would be better advised to look for investment locations elsewhere.(auth)

  4. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  5. Small hydro generation building block profile

    International Nuclear Information System (INIS)

    2003-01-01

    Concise business information on small hydro generation in British Columbia was presented in this document. It was noted that the steep terrain within the province and its abundant precipitation provides numerous opportunities for hydropower generation in British Columbia. The hydroelectric sector produces approximately 90 per cent of the electrical demand in the province. The document focusses on small hydro sites producing between 0.5 and 50 mega watts (MW) and not having large water storage. In the first section, an overview of the electricity sector in the province is provided. The following issues are examined in subsequent sections: land resources; infrastructure requirements; sales market; labour market; the regulatory regime; development factors; non-governmental aspects; investments and economics; the present status and future outlook of the industry; and, government revenue. Input-output tables were also provided. 22 refs., 5 tabs., 4 figs

  6. An overview on small hydro in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Filho, G.T. [Federal Univ. of Itajuba (Brazil). National Reference Centre for Small Hydro

    2008-07-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km{sup 2}. It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  7. Distributed power in Afghanistan: The Padisaw micro-hydro project

    International Nuclear Information System (INIS)

    Hallett, Michael

    2009-01-01

    The provision of electricity is a vital need in reconstruction and development situations, like that in Afghanistan. Indeed, according to the Afghan government's Afghan National Development Strategy (ANDS) the need for electricity featured in 80% of the Provincial Development Plans as a top priority. With the help of the International Community, the government of Afghanistan is attempting to develop a new market oriented approach to the nationwide provision of electrical power. Although the bulk of the electrification effort is directed toward large scale construction of a national grid, the ANDS explicitly mentions a role for 'micro-hydro, solar, waste and small scale diesel power and energy generating sources'. This article will describe a micro-hydro project in Padisaw village, in the Nurgaram district of Nuristan province located in Northeastern Afghanistan and the role Provincial Reconstruction Team played in working with the local community through the project planning and building processes and offer some observation on how, as the Afghan National Development Strategy is executed, the private sector can play an increasingly significant role in the Afghan distributed energy arena. (author)

  8. New construction of the Leis-Gannibach small hydro power station in Vals, Switzerland; Elektrizitaetswerk der Gemeinde Vals, 7132 Vals. Neubau Kleinwasserkraftwerk 'Leis-Gannibach' - Schlussbericht / Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Mittner, Ch.

    2010-03-15

    This report for the Swiss Federal Office of Energy (SFOE) presents a project concerning a new small hydro installation in Vals, Switzerland. A system in planning is to provide artificial snow at this ski resort using water from the Gannibach stream. The local utility in Vals intends to use this water during those periods when no artificial snow is needed to drive a small hydro power plant. The paper discusses the current situation, the hydrology of the catchment area and the potential that can be used. The legal and planning situation is examined and details of the project are provided, including water intake, pressurised piping, turbine, generator and control system. Finally, the financial viability of the project is examined.

  9. Small-scale hydro-power plant in Quinto - Preliminary project; Progetto minicentrale idroelettrica, Ri Secco - Quinto. Programma piccole centrali idrauliche. Progetto di massima

    Energy Technology Data Exchange (ETDEWEB)

    Dotti, R. [Reali e Guscetti SA, Ambri (Switzerland); Rosselli, P. [Celio Engineering SA, Ambri (Switzerland)

    2009-06-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the alpine stream 'Ri Secco' in the municipality of Quinto, southern Switzerland. The Ri Secco partly flows in a steep canyon. The elevation difference of 810 or 620 m (depending on the location of the water deviation from the stream) is favorable to the installation of a small-scale high-head power plant. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include two possible penstock diameters for each weir location. The electricity production expected is discussed, as is the economic viability of the project.

  10. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  11. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  12. The Development of the Mealings, Demuth, Dillon, and Buchholz Classroom Speech Perception Test

    Science.gov (United States)

    Mealings, Kiri T.; Demuth, Katherine; Buchholz, Jörg; Dillon, Harvey

    2015-01-01

    Purpose: Open-plan classroom styles are increasingly being adopted in Australia despite evidence that their high intrusive noise levels adversely affect learning. The aim of this study was to develop a new Australian speech perception task (the Mealings, Demuth, Dillon, and Buchholz Classroom Speech Perception Test) and use it in an open-plan…

  13. Asymptotics and Numerics of Polynomials Used in Tricomi and Buchholz Expansions of Kummer functions

    NARCIS (Netherlands)

    J.L. López; N.M. Temme (Nico)

    2010-01-01

    textabstractExpansions in terms of Bessel functions are considered of the Kummer function ${}_1F_1(a;c,z)$ (or confluent hypergeometric function) as given by Tricomi and Buchholz. The coefficients of these expansions are polynomials in the parameters of the Kummer function and the asymptotic

  14. Hybrid Micro-Hydro Power Generation Development in Endau Rompin National Park Johor, Malaysia

    Directory of Open Access Journals (Sweden)

    Yusop Azli

    2017-01-01

    Full Text Available Micro-Hydro electrical power systems are very useful for remote area electrification which does not had supply from the national grid. On the contrary, this area has river streams with high potential for micro-hydro power generation. As such, the UTHM ECO-Hydro Team embarked on a project for erecting a micro-hydro power plant with collaboration with National Education Research Center (NERC, Johor National Park Corporation in Endau Rompin. The existing power generation in this area at present is by using diesel generator gives negative impact on finance and environment in the long run. It supplies power to several including library, offices, open laboratory, chalets and dorms.. At the moment, the micro-hydro system complements the diesel generator, thus becoming a hybrid power generation system.

  15. Method for assessing wind power integration in a hydro based power system

    International Nuclear Information System (INIS)

    Norheim, I.; Palsson, M.; Tande, J.O.G.; Uhlen, K.

    2006-01-01

    The present paper demonstrates a method for assessment of how much wind power that can be integrated in a system with limited transmission capacity. Based on hydro inflow data and wind measurements (for different locations of planned wind farms in an area) it is possible to assess how much wind power that can be fed into a certain point in the transmission network without violating the transmission capacity limits. The proposed method combines the use of market modelling and detailed network analysis in order to assess the probability of network congestions rather than focusing on extreme cases. By computing the probability distribution of power flow on critical corridors in the grid it is possible to assess the likelihood of network congestions and the amount of energy that must be curtailed to fulfil power system security requirements (n-1). This way the assessment is not only made of worst case scenarios, assuming maximal flow from hydro plants and maximal wind power production. As extreme case scenarios are short term and may be solved by market mechanisms or automatic system protection schemes (disconnection of wind power or hydro power), the proposed method may reveal that it would be economic to install more wind power than if only based on analysis of worst case scenarios. (orig.)

  16. Analysis and assessment of environmental impacts of small hydro power plant in Slovakia

    Science.gov (United States)

    Zeleňáková, M.; Fijko, R.; Remeňáková, I.

    2017-10-01

    Environmental impact assessment (EIA) is an important process that, prior to approval of the investment plan, can provide a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to apply a specific methodology for the analysis and evaluation of the environmental impacts of selected constructions, namely, small hydro power plant, using matrix of impacts. This analysis method is intended not only to increase the clarity and precision of the evaluation process, but also to align it with the requirements of the environmental impact assessment system. This modification should improve the reliability of the environmental impact assessment, and could moreover also be applied to other infrastructure projects. Comparison of alternatives and designation of the optimal variant are implemented based on selected criteria that objectively describe the characteristic lines of the planned alternatives of activity and their impact on the environment. The use of proper EIA procedures can help the decision-makers to formulate proper activities based on qualified decisions. The designed project in Spišské Bystré, Slovakia is used as a case study to clarify and exemplify the methodology and techniques.

  17. Hydro to market green power at special prices

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1996-01-01

    A 600 kW grid-connected demonstration wind turbine at Ontario Place will provide green power to Toronto residents early in 1997. The joint venture project partners include publicly owned Ontario Hydro, Toronto Hydro and Natural Resources Canada. The power will be sold at a premium under arrangements yet to be announced. The green power pricing initiative would allow some customers to buy their electricity at a green price. The project could be a self-financing model for future renewable energy development. The Ontario Place turbine project will determine whether Toronto electricity customers want green power or electricity from nuclear and fossil stations, and could determine which type of generation should be built in the future

  18. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  19. Liquid assets: factors contributing to the development of small hydro in China

    International Nuclear Information System (INIS)

    Pan, D.

    2006-01-01

    The rapid growth of small hydro capacity in China is reviewed. At present, the annual generation from rural small hydropower in China equates with the saving of 44 million tonnes of coal, or the emission of 110 million tonnes of carbon dioxide. Other environmental advantages such as a reduction in wood burning, reduced logging and therefore reduced soil erosion, are mentioned. Energy-starved China stood to gain much from the development of small hydro systems and government policy has been supportive in terms of relatively low tax rates and low interest loans. It is expected that due to the rapid economic growth in China, small-scale hydro will maintain its present level of development and continue to be promoted in a sound and rational manner. (author)

  20. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  1. Gas, benefits and question marks. The Oklo reactors: 100 % natural. The Kyoto protocol: use it or lose it?. Small hydro power: a great leap forward. The energy mix of South Korea

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This issue of Alternatives newsletter contains a main press-kit about natural gas economics worldwide and 4 articles dealing with the Oklo natural reactor, the Kyoto protocol, the small hydro-power in China, and the energy mix of South Korea: 1 - 'Gas benefits and question marks': The world's most widely distributed fossil fuel, natural gas is also the fastest-growing energy source of the past thirty years. Its position as the fuel of choice in the global energy mix is due in large part to its many domestic and industrial applications. 2 - 'The Oklo reactors: 100% natural': Another look at this extraordinary 2 billion year-old phenomenon in words and pictures: the nuclear fission reaction that created the natural reactors of Gabon. 3 - 'The Kyoto Protocol: use it or lose it?': Nearly eight years after its signature, the Kyoto Protocol is still hotly debated. Two experts give us their views: Spencer Abraham, former U.S. Secretary for Energy, and Jean-Charles Hourcade of CIRED, the international center for research on the environment and development. 4 - 'Small hydro power: a great leap forward': The Chinese government has responded to the need for rural electrification with an aid program for the country's poorest cantons. Enter the small hydro plant in northern Guangxi province. 5 - 'The energy mix of South Korea': Faced with continuing strong economic growth and energy demand, South Korea has multiplied its projects, from hydropower to tidal power to nuclear and even hydrogen in the longer term

  2. Hydro-electric power - potential and limitations

    Energy Technology Data Exchange (ETDEWEB)

    Amundsen, T.

    1995-12-31

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world`s growing population, the unavoidable conclusion is that more power is to be produced. 3 figs.

  3. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  4. Retrofitting the small-scale hydro power plant 'La Chocolatiere' in Echandens-Bussigny, Switzerland; Rehabilitation de la petite centrale de la Chocolatiere (Echandens - Bussigny)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-05-15

    This report for the Swiss Federal Office of Energy (SFOE) is a project study for the retrofitting of a small-scale hydro power plant installed on the River Venoge, between the communities of Echandens and Bussigny, western Switzerland. At this site, hydro power is used since the 18{sup th} century. A permanent license to use at most 3 m{sup 3}/s is available. The study concludes that the maximum flow rate of 6 m{sup 3}/s would be more advantageous, implying a 35 cm higher dam on the river. Two turbines could then be installed, leading to the maximum electric power of 177 kW and the power production of 727,000 kWh/y. From the detailed inventory of the retrofitting work and the installation of the new turbines - including a new fish ladder according to the legislation in force - the authors conclude that electricity could be generated at a cost amounting to about CHF 0.24/kWh. It is recommended to request the modification of the water use license in order to be able to use up to 6 m{sup 3}/s.

  5. Decision making algorithms for hydro-power plant location

    CERN Document Server

    Majumder, Mrinmoy

    2013-01-01

    The present study has attempted to apply the advantage of neuro-genetic algorithms for optimal decision making in maximum utilization of natural resources. Hydro-power is one of the inexpensive, but a reliable source of alternative energy which is foreseen as the possible answer to the present crisis in the energy sector. However, the major problem related to hydro-energy is its dependency on location. An ideal location can produce maximum energy with minimum loss. Besides, such power-plant also requires substantial amount of land which is a precious resource nowadays due to the rapid and unco

  6. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  7. The St. Niklausen drinking-water powered, small hydro scheme in Bad Ragaz; Gemeinde Bad Ragaz - Trinkwasserkraftwerk St. Niklausen - Vorstudie Bericht

    Energy Technology Data Exchange (ETDEWEB)

    Rueesch, T.

    2009-04-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at the results a preliminary study on the installation of a drinking-water powered small hydro scheme in Bad Ragaz, Switzerland. The installation of new pressure pipes and a new balancing reservoir are proposed. Three variants are proposed and discussed, two of which are considered as being economically viable. The various new installations and components proposed are described and discussed. Investment considerations, energy production and costs are looked at as well as support from the Swiss scheme for the cost-covering remuneration for electricity from renewable energy sources. The report is augmented with photos and plans.

  8. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  9. Theoretical and conditional monitoring of a small three-bladed vertical-axis micro-hydro turbine

    International Nuclear Information System (INIS)

    Huang, Sy-Ruen; Ma, Yen-Huai; Chen, Chia-Fu; Seki, Kazuichi; Aso, Toshiyuki

    2014-01-01

    Highlights: • This paper presents a novel 3 three-bladed vertical-axis micro-hydro turbine system. • This paper presents structure and performance of micro-hydroelectric turbine system. • The paper reveal that using VAMHT system in water is distinct from using in wind. • This paper present an experimental results of VAMHT system. • The paper show that the status transformation from cut-into stable power generation is short. - Abstract: This paper presents a novel 3-kW three-bladed vertical-axis micro-hydro turbine (VAMHT) system. The experimental results reveal that using this type of turbine in water is distinct from using it in wind. The micro-hydro turbine system uses a three-phase permanent magnet symmetric generator that transforms mechanical energy into electrical energy. The output voltage and frequency of the generator depend on water flow speed, and voltage steady equipment is used to maintain the maximum output power of the DC bus. According to the maximum power point tracking of the micro-hydro turbine system, the condition monitoring of the novel micro-hydro turbine requires no water flow meter. Furthermore, the construction and installation of the new micro-hydro turbine is simple, economical, and stable. This system combines a micro-hydro generator and electrical state-monitoring system, which can measure the speed, output power, DC-bus voltage, and all electrical characteristics of the micro-hydro turbine system. The results of comparing turbine between wind and water show that the speed ranges of water flow is narrower than that of wind, and the status transformation from cut-into stable power generation is short

  10. Inventory studies of hydroelectric power plants: the methodological differences for small and large power plants; Estudos de inventario de usinas hidreletricas: as diferencas metodologicas para pequenas e grandes centrais

    Energy Technology Data Exchange (ETDEWEB)

    Bajay, Sergio Valdir [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Energia; Martinez, Carlos Barreira [Faculdade de Engenharia Civil de Itajuba, MG (Brazil)

    1992-12-31

    The hydroelectric potential handbook produced by ELETROBRAS provides procedures to guides the hydro power studies of river sites. In this paper, a critical analysis of these procedures is carried out, for both large and small hydro power plants, pin pointing the plant`s planning/design interface there, several proposals are put forward in the order to adapt these procedures to small hydro plants, optimizing their planning and design for the several situation, found in Brazilian reality. (author) 5 refs.

  11. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  12. Development of Dalaelven hydro power scheme in Sweden

    International Nuclear Information System (INIS)

    Kokko, Voitto; Hjerthen, Peter; Ingfaelt, Hans; Loewen, Karl-Erik; Sjoegren, Arne

    2015-01-01

    The Dalaelven hydro scheme is located in central Sweden. Fortum has in the scheme 50 dams and 35 hydro power plants producing 4 TWh energy with a capacity of 970 MW. The main reservoirs are Lake Siljan and Traengsletsjoen with Traengslet dam, the highest earth-filled dam in Sweden. Development of the hydro scheme started 1878 with construction of four power plants for industry until 1930. From 1931 to 1974 15 power plants were built for increasing electricity consumption. De-regulation of the energy market in 1990's and EU environmental targets in 2000's resulted in the rehabilitation of ten power plants between 1990 and 2014 with increased annual energy production of 377 GWh (29%) and capacity 124 MW (59%). This energy decreases the annual CO 2 emissions with 125918 tons in comparison to production of the same amount of energy by coal. In several cases the rehabilitation was made in new power houses, allowing the development of the layout and technology of civil structures, and use of state-of-art equipment. Sweden uses the green certificate system, and 235 GWh of the energy received this certificate. Other environmental benefits come from use of the environmentally friendly Kaplan turbines and construction of some new fish pass. There are further plans to increase the spillway capacity of Traengslet dam and to rehabilitate eight power plant units. The possibilities of obtaining the Environmental licences for the rehabilitations has became challenging in the past years and green certificates are nowadays agreed only for increased energy. (authors)

  13. Dead battery? Wind power, the spot market, and hydro power interaction in the Nordic electricity market

    OpenAIRE

    Mauritzen, Johannes

    2011-01-01

    It is well established within both the economics and power system engineering literature that hydro power can act as a complement to large amounts of intermittent energy. In particular hydro power can act as a "battery" where large amounts of wind power are installed. In this paper I use simple distributed lag models with data from Denmark and Norway. I find that increased wind power in Denmark causes increased marginal exports to Norway and that this effect is larger during periods of net ex...

  14. Financing options for small hydro projects

    International Nuclear Information System (INIS)

    Shepherd, J.C.

    1993-01-01

    Examples and techniques used to enhance the ability to finance small hydro projects, or to finance them in non-standard ways, were discussed. It was suggested that factors that motivate investors, namely the maximization of the rate of return on capital, and minimization of risk, should be the primary concern for any would-be developer. A responsible, conservative approach to financial projections was recommended as the best to impress potential investors

  15. Summarized report of geothermal well Gross Buchholz Gt1; Kurzprofil der Geothermiebohrung Gross Buchholz Gt1

    Energy Technology Data Exchange (ETDEWEB)

    Schaefer, Frauke; Hesshaus, Annalena; Jatho, Reiner; Luppold, Friedrich-Wilhelm; Pletsch, Thomas; Tischner, Torsten [Bundesanstalt fuer Geowissenschaften und Rohstoffe (BGR), Hannover (Germany); Hunze, Sabine; Orilski, Judith; Wonik, Thomas [Leibniz-Institut fuer Angewandte Geophysik (LIAG), Hannover (Germany); Roehling, Heinz-Gerd [Landesamt fuer Bergbau, Energie und Geologie (LBEG), Hannover (Germany)

    2012-01-15

    The well Gross Buchholz Gt1 is a deep geothermal well intended to demonstrate the feasibility of deep geothermal energy mining from tight sedimentary rocks. It is the core part of the GeneSys (Generated Geothermal Energy Systems) project, aiming at developing single well concepts for direct use of geothermal energy. During the course of the project, three different single well concepts have been developed and tested at the research well Horstberg Z1 which is geologically comparable to the Gross Buchholzwell. The latter is intended to supply the heating energy for the premises of Geozentrum Hannover, an office and lab complex of some 35.000 m{sup 2} housing about 1000 employees. The geothermal target are the sandstones of the Lower Triassic Middle Buntsandstein Formation, which have a temperature of about 165 C at 3700 depth. The well has reached a final depth of 3901 m below ground level, penetrating a nearly complete succession from the Lower Cretaceous (Albian) to the Lower Triassic (Lower Buntsandstein), while Tertiary and Upper Cretaceous sediments are missing. This article summarizes technical and geographic data, stratigraphic classification, geophysical logging, cores, and sidewall cores of the well. (orig.)

  16. A novel off-grid hybrid power system comprised of solar photovoltaic, wind, and hydro energy sources

    International Nuclear Information System (INIS)

    Bhandari, Binayak; Lee, Kyung-Tae; Lee, Caroline Sunyong; Song, Chul-Ki; Maskey, Ramesh K.; Ahn, Sung-Hoon

    2014-01-01

    Highlights: • We propose two hybridization methods for small off-grid power systems consisting solar (PV), wind, and micro-hydro sources. • One of the methods was implemented in a mini-grid connecting Thingan and Kolkhop villages in Makawanpur District, Nepal. • The results can be applied to help achieve Millennium Development Goal 7: Ensuring environmental sustainability. • This is the first implementation anywhere comprising of three renewable energy power, in a single off-grid power system. • This research may be applied as a practical guide for implementing similar systems in various locations. - Abstract: Several factors must be considered before adopting a full-phase power generation system based on renewable energy sources. Long-term necessary data (for one year if possible) should be collected before making any decisions concerning implementation of such a systems. To accurately assess the potential of available resources, we measured solar irradiation, wind speed, and ambient temperature at two high-altitude locations in Nepal: the Lama Hotel in Rasuwa District and Thingan in Makawanpur District. Here, we propose two practical, economical hybridization methods for small off-grid systems consisting entirely of renewable energy sources—specifically solar photovoltaic (PV), wind, and micro-hydro sources. One of the methods was tested experimentally, and the results can be applied to help achieve Millennium Development Goal 7: Ensuring environmental sustainability. Hydro, wind, and solar photovoltaic energy are the top renewable energy sources in terms of globally installed capacity. However, no reports have been published about off-grid hybrid systems comprised of all three sources, making this implementation the first of its kind anywhere. This research may be applied as a practical guide for implementing similar systems in various locations. Of the four off-grid PV systems installed by the authors for village electrification in Nepal, one was

  17. Water turbine technology for small power stations

    Science.gov (United States)

    Salovaara, T.

    1980-02-01

    The paper examines hydro-power stations and the efficiency and costs of using water turbines to run them. Attention is given to different turbine types emphasizing the use of Kaplan-turbines and runners. Hydraulic characteristics and mechanical properties of low head turbines and small turbines, constructed of fully fabricated steel plate structures, are presented.

  18. Estimation of small-scale hydroelectric power plant costs

    International Nuclear Information System (INIS)

    Santos, Afonso Henriques Moreira; Silva, Benedito Claudio da; Magalhaes, Ricardo Nogueira

    2010-01-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  19. Preliminary study for a drinking-water hydro-power station in Raron, Switzerland; Vorstudie Trinkwasserkraftwerk 'Moos', Gemeinde Raron VS

    Energy Technology Data Exchange (ETDEWEB)

    Loretan, F. [Schneider - Bregy und Partner AG, Raron, (Switzerland); Hiller, B. [Ryser Ingenieure AG, Berne (Switzerland)

    2006-07-01

    This final report for the Small Hydro Programme of the Swiss Federal Office of Energy (SFOE) presents the concept for the augmentation of an existing drinking-water-powered small hydro-electric project with an additional installation that is to use the overflow-water of a reservoir to drive a 75 kW Pelton turbine. The paper discusses the hydraulic situation and describes the installations proposed. Energy production and the costs involved are listed and commented on. Water in drinking-water quality from the Loetschberg railway tunnel is also to be used in the system.

  20. Analysis of Axial Turbine Pico-Hydro Electrical Power Plant in North Sulawesi Indonesia

    Science.gov (United States)

    Sangari, F. J.; Rompas, P. T. D.

    2018-02-01

    This study presents analysis of pico-hydro electrical power plant in North Sulawesi, Indonesia. The objective of this study is to get a design of axial turbine pico-hydro electrical power plant. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of study, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design of axial turbine pico-hydro installation is connected to a generator to produce electrical energy maximum can be used for household needs in villages. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia.

  1. Hydro power plants, an overview of the current types and technology

    OpenAIRE

    Tkáč Štefan

    2018-01-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy...

  2. BC Hydro - IPC review : report on the creation of IPC International Power Corporation and its joint venture with the British Columbia Hydro and Power Authority for the Raiwind power project

    International Nuclear Information System (INIS)

    1997-03-01

    BC Hydro is one of the sponsors involved in the construction of a thermal electric power plant in Raiwind, Pakistan. As a Crown corporation, BC Hydro and its participation in the project is subject to the policies and priorities of the provincial government. This document describes the circumstances surrounding the creation of the International Power Corporation (IPC) and its joint venture with BC Hydro for the development of international power projects including the Raiwind project. The project has provoked much public discussion in British Columbia because of the involvement of Cayman Island companies in the project structure. There is concern with the intermingling of public and private interests in the project, including allegations that an IPC share offering benefited insiders of government and BC Hydro. A description of the history and structure of the Raiwind project and detailed information on the British Columbia participants is provided. Directors and shareholders of the principal corporate participants are listed. The development process in Pakistan, the key features of the project and the underlying agreements among the participants are described. An assessment of potential conflicts of interest and a review of public sector standards and guidelines regarding conflicts of interest is presented. 60 refs., 39 tabs., 6 figs

  3. Power source labelling and hydro-power - a chance or a risk?

    International Nuclear Information System (INIS)

    Wurche, P.

    2005-01-01

    This short article discusses the electricity labelling legislation passed in Switzerland in November 2004 and similar legislation currently being introduced on a Europe-wide basis. In the future, electricity consumers will be provided with regular information on where and in which type of power station their electricity is generated. The article discusses how such a declaration may affect Swiss hydro-power stations and the changes in customer-perception that the power generation declaration will initiate

  4. Modelling energy production by small hydro power plants in collective irrigation networks of Calabria (Southern Italy)

    Science.gov (United States)

    Zema, Demetrio Antonio; Nicotra, Angelo; Tamburino, Vincenzo; Marcello Zimbone, Santo

    2017-04-01

    The availability of geodetic heads and considerable water flows in collective irrigation networks suggests the possibility of recovery potential energy using small hydro power plants (SHPP) at sustainable costs. This is the case of many Water Users Associations (WUA) in Calabria (Southern Italy), where it could theoretically be possible to recovery electrical energy out of the irrigation season. However, very few Calabrian WUAs have currently built SHPP in their irrigation networks and thus in this region the potential energy is practically fully lost. A previous study (Zema et al., 2016) proposed an original and simple model to site turbines and size their power output as well as to evaluate profits of SHPP in collective irrigation networks. Applying this model at regional scale, this paper estimates the theoretical energy production and the economic performances of SHPP installed in collective irrigation networks of Calabrian WUAs. In more detail, based on digital terrain models processed by GIS and few parameters of the water networks, for each SHPP the model provides: (i) the electrical power output; (iii) the optimal water discharge; (ii) costs, revenues and profits. Moreover, the map of the theoretical energy production by SHPP in collective irrigation networks of Calabria was drawn. The total network length of the 103 water networks surveyed is equal to 414 km and the total geodetic head is 3157 m, of which 63% is lost due to hydraulic losses. Thus, a total power output of 19.4 MW could theoretically be installed. This would provide an annual energy production of 103 GWh, considering SHPPs in operation only out of the irrigation season. The single irrigation networks have a power output in the range 0.7 kW - 6.4 MW. However, the lowest SHPPs (that is, turbines with power output under 5 kW) have been neglected, because the annual profit is very low (on average less than 6%, Zema et al., 2016). On average each irrigation network provides an annual revenue from

  5. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  6. The 'Les iles' small-hydro power plant - Summary analysis; Analyse sommaire. Petite centrale hydroelectrique de Sombeval 'Les iles' - Rapport 2008

    Energy Technology Data Exchange (ETDEWEB)

    Hausmann, M.

    2008-01-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the River Suze in the Swiss Jura Mountains. The installation is to be made at the site of a small dam that previously provided water for a water-wheel-driven sawmill. A fish-pass at the site is also foreseen. The report presents details on the hydrological data for the river and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the regulation of water levels and the removal of river sediment. The electricity production expected is discussed, as is the economic viability of the project.

  7. Hydro power in the German system of energy supply; Wasserkraft im Energiesystem Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Kaltschmitt, M. [Stuttgart Univ. (Germany). Abt. Neue Energietechnologie und Technikanalyse

    1997-12-31

    The technical potentials of electric power generation from hydro power in Germany, the current harnessing of hydro power, its costs, and certain characteristic quantities reflecting its effects on the environment are described. These diverse characteristic quantities are compared with those of other renewable and fossil energy sources used to generate electricity. On this basis, opportunities for extending the use of hydro power in Germany and its limits are discussed. (orig.) [Deutsch] Das Ziel der folgenden Ausfuehrungen ist, die technischen Potentiale und deren derzeitige Nutzung, die Kosten und bestimmte die Umwelteffekte beschreibende Kenngroessen einer Stromerzeugung aus Wasserkraft in Deutschland darzustellen. Diese unterschiedlichen Kenngroessen werden anschliessend mit denen anderer regenerativer Energien und fossiler Energietraeger zur Stromerzeugung verglichen. Ausgehend davon werden die Moeglichkeiten und Grenzen einer weitergehenden Wasserkraftnutzung im Energiesystem Deutschland diskutiert. (orig.)

  8. Effects of Scandinavian hydro power on storage needs in a fully renewable European power system for various transmission capacity scenarios

    Science.gov (United States)

    Kies, Alexander; Nag, Kabitri; von Bremen, Lueder; Lorenz, Elke; Heinemann, Detlev

    2015-04-01

    The penetration of renewable energies in the European power system has increased in the last decades (23.5% share of renewables in the gross electricity consumption of the EU-28 in 2012) and is expected to increase further up to very high shares close to 100%. Planning and organizing this European energy transition towards sustainable power sources will be one of the major challenges of the 21st century. It is very likely that in a fully renewable European power system wind and photovoltaics (pv) will contribute the largest shares to the generation mix followed by hydro power. However, feed-in from wind and pv is due to the weather dependant nature of their resources fluctuating and non-controllable. To match generation and consumption several solutions and their combinations were proposed like very high backup-capacities of conventional power generation (e.g. fossile or nuclear), storages or the extension of the transmission grid. Apart from those options hydro power can be used to counterbalance fluctuating wind and pv generation to some extent. In this work we investigate the effects of hydro power from Norway and Sweden on residual storage needs in Europe depending on the overlaying grid scenario. High temporally and spatially resolved weather data with a spatial resolution of 7 x 7 km and a temporal resolution of 1 hour was used to model the feed-in from wind and pv for 34 investigated European countries for the years 2003-2012. Inflow into hydro storages and generation by run-of-river power plants were computed from ERA-Interim reanalysis runoff data at a spatial resolution of 0.75° x 0.75° and a daily temporal resolution. Power flows in a simplified transmission grid connecting the 34 European countries were modelled minimizing dissipation using a DC-flow approximation. Previous work has shown that hydro power, namely in Norway and Sweden, can reduce storage needs in a renewable European power system by a large extent. A 15% share of hydro power in Europe

  9. Current status and future developments of small and micro hydro in southern Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2012-05-01

    Full Text Available -1 Current status and future developments of small and micro hydro in southern Africa Wim Jonker Klunne Council for Scientific and Industrial Research (CSIR) PO Box 395 Pretoria 0001 South Africa Introduction Small and micro hydropower... are renewable energy technologies that have large potential in the south- ern African region, both for grid and off-grid applications. Within the region a good understanding exists on the potential for large scale hydro with a substantial number of plants...

  10. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  11. Hydro and nuclear power for African less-carbon development

    Energy Technology Data Exchange (ETDEWEB)

    El-Gazzar, Mohamed; Ibrahim, Yassin Mohamed; Bedrous, Maher Aziz

    2007-07-01

    Though the overall picture reveal availability of enormous energy resources which far exceed energy requirements of Africa, most of these resources are grossly underutilized, particularly hydro and nuclear resources. It suggests that Africa's problem is not lack of energy resources but its development and utilization. The region will remain a major net exporter of energy for several decades to com. In dealing with its energy problems Africa faces a unique set of initial conditions, defined mainly by its level and pattern of economic growth, social and demographic characteristics, energy resource endowment, location distances between supply sources and consumption areas, technological underdevelopment, and poverty-driven energy-environment conflict. A key challenge is the optimal utilization of the Africa's energy resources to facilitate both individual country and regional energy and economic development. Stronger emphasis on a more integrated energy supply network based on more widespread regional initiatives, particularly in electricity is essential to sustainable energy development in Africa. This paper discusses the prospects for hydro and nuclear power in Africa. The continent is the poorest in the world. The lack of reliable, accessible and affordable energy hinders its development. Hydro and nuclear power promises to be the least-carbon energy sources, while being the cheapest and most reliable among all. The role the hydropower can play in securing a sustainable energy future for Africa is highly emphasized. Also, nuclear power has many advantages to Africa. Opportunities for hydropower and nuclear power in Africa are all considered. Advantages and disadvantages are also all discussed. (auth)

  12. The 'Alte Ziegelei' small hydro-power installation in Derendingen, Switzerland; Kleinwasserkraftwerk alte Ziegelei in Derendingen. Programm Kleinwasserkraftwerke. Erfahrungs- und Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Koehli, T.

    2006-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) discusses the experience gained with a small hydro-power installation in Derendingen, Switzerland. This unique 'micro' installation uses an archimedian screw to produce 6.8 kW of power from a head of 1.15 m and a through-flow of 800 - 1000 litres per second. Optimisation of the project is discussed as are the effects of changing water levels above and below the screw. Winter operation is described and the mounting of gratings necessary to avoid the intake of debris is discussed. Fish-passes are looked at and the effort required for maintenance is compared with that for other types of installations. An accident that occurred is analysed and the results of energy-efficiency measurements made on the installation are presented. The report is rounded off with an evaluation of the plant's performance and a review of future work to be done.

  13. Small water courses for electric power generation; Mit wenig Wasser zum Fliessen bringen

    Energy Technology Data Exchange (ETDEWEB)

    Ossberger, K.F.; Wirth, D. [Ossberger Turbinenfabrik GmbH und Co, Weissenburg (Germany)

    1997-12-31

    In principle, no one nowadays doubts the usefulness of small hydroelectric installations. Hydro power is a renewable energy source. Contrary to oil, gas or coal, the energy source is not consumed. Hydroelectric power generation neither gives rise to atmospheric pollution nor does it cause residual products; it is environment-friendly. Moreover, the energy used is a native one. These arguments no doubt advocate the broadest possible use of hydro power, especially also in the form of small hydroelectric installations. (orig.) [Deutsch] Grundsaetzlich gibt es heutzutage keinen Zweifel am Nutzen von Kleinkraftwerken. Die Wasserkraft ist eine regenerierbare Energiequelle. Im Gegensatz etwa zu Oel, Gas oder Kohle wird der Energietraeger Wasser beim Nutzungsvorgang nicht aufgebraucht. Die Stromerzeugung aus Wasserkraft belastet die Umwelt weder durch Luftschadstoffe noch Rueckstaende, sie ist umweltfreundlich. Und man nutzt damit einheimische Energie. Gewichtige Argumente zweifellos, die fuer eine moeglichst weitgehende Wasserkraftnutzung, gerade auch in Kleinkraftwerken, sprechen. (orig.)

  14. Experimental investigation of fish downstream passage and turbine related fish mortality at an innovative hydro power setup

    International Nuclear Information System (INIS)

    Geiger, Franz; Cuchet, Mathilde; Rutschmann, Peter

    2016-01-01

    The fish downstream passage of small fish at the innovative TUM hydro shaft power plant concept was investigated experimentally. The behavior of 1974 inserted individuals of brown trout, grayling, barbel, minnow and bullhead of 45 mm to 220 mm body length was observed in a fully functional test setup which included a 35 kW Kaplan turbine and a horizontal screen with 20 mm bar clearance. The 24 h tests were conducted under nature like conditions whereas the laboratory environment also enabled targeted hydraulic situations and modifications of the bypass during the test series. A recapture rate of the fish of 99% and a subsequent 96 h observation period yielded detailed information about the migration behavior and instant as well as long term mortality. The results reveal the actual passage distribution of small fish between bypass and turbine and the turbine related injury and mortality rates in dependency of fish species, fish length, turbine discharge and bypass arrangement. General trends as well as species specific particularities could be deduced. The work confirms the suitability of the employed experimental approach and the ecological potential of the investigated hydro power plant concept. The behavioral barrier effect of the screen on small fish and the necessary of appropriate downstream migration corridor were proved and quantified. (authors)

  15. Policy and regulatory framework conditions for small hydro power in Sub-Saharan Africa

    Energy Technology Data Exchange (ETDEWEB)

    Koelling, Fritz [Sustainable Energy and Environment, Karlsruhe (Germany); Gaul, Mirco; Schroeder, Miriam [SiNERGi Consultancy for Renewable Energies, Berlin (Germany)

    2011-07-01

    The vast potential of mini and micro hydro power (MHP) in Sub-Saharan African countries is one promising option to cover increasing energy demand and to enable electricity access for remote rural communities. Based on the analysis of 6 African countries (Ethiopia, Kenya, Mozambique, Nigeria, Rwanda, South Africa), this study sheds light on some of the main barriers on the level of political and regulatory framework conditions which include gap between the national-level policies and regulations and local MHP project implementation, lack of financing and limited capacities for project planning, building and operation. The paper also identifies some promising practices employed in several SSA countries of how to overcome these barriers and concludes with recommendations of how to create positive feed-backs between ambitious policies and regulations and MHP financing and capacity development needs in order to scale up MHP deployment and MHP sector development. (orig.)

  16. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  17. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  18. Renewal of the small hydro power plant 'La Foulaz' on the river Orbe in Vallorbe, Switzerland; Rehabilitation de la petite centrale hydroelectrique de la Foulaz sur l'Orbe a Vallorbe. Etude d'avant projet - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Chenal, R.; Denis, V. [La Foulaz Energies SA, Vallorbe (Switzerland); Chuat, O. [RWB Eau et Environnement SA, Cernier (Switzerland)

    2009-08-15

    For now nearly four centuries, hydro power is used on the site named 'La Foulaz' on the river Orbe in the Vallorbe municipal territory. The existing small-scale hydro power plant is under neglect since 1970, although it enjoys a permanent water usage concession of 4.2 m{sup 3}/s. Since June 2008 the company 'La Foulaz Energie SA' owns the site and the water concession and is planning the renewal of the hydro power plant. The plan is to replace the existing permanent water flow rate usage concession by a higher water flow rate usage one of reasonable but limited duration. Reliable hydrological data are available from the Swiss Federal Administration as well as from the electricity utility 'Romande Energie SA' that operates the 'La Dernier' hydro power plant located up-stream. According to these data the design flow rate of 10 m{sup 3}/s has been selected for the new 'La Foulaz' plant. The available water head for the turbine is in the range 1.46 to 3-00 m, depending on the flow rate in the river Orbe. The average annual power production is estimated to 708,000 kWh. The peak electrical power would be 164 kW. With a cost recovery time of 25 years the production cost is estimated to 25 Swiss cents/kWh. This just enables to balance the budget. (author)

  19. Nuclear power at Ontario Hydro

    International Nuclear Information System (INIS)

    Tapon, F.; Osborne, T.J.

    1980-01-01

    This case study shows that the diffusion of nuclear power in the electric public utility industry in Canada approximates the logistic growth curve, in agreement with previous results on technological innovation diffusion in the U.S. private sector. Many of the economic variables that affect this diffusion in the private sectors in the U.S. and Canada are also significant in the public sector in Canada. Too few utilities have adopted nuclear technology to permit using regression analysis to study the effect of environmental and regulatory factors on the growth of Ontario Hydro. Thus, cost-benefit analysis for each province might be more effective

  20. Optimal Capacity Proportion and Distribution Planning of Wind, Photovoltaic and Hydro Power in Bundled Transmission System

    Science.gov (United States)

    Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.

    2017-05-01

    The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.

  1. Small Hydropower - The comeback of small hydropower stations

    International Nuclear Information System (INIS)

    Niederhaeusern, A.

    2008-01-01

    This issue of the 'Erneuerbare Energien' (renewable energies) magazine published by the Swiss Solar Energy Society takes a look at small hydropower projects in Switzerland. In a number of interviews and articles, various topics concerning small hydropower are dealt with. First of all, an interview with Bruno Guggisberg, previously responsible for small hydro at the Swiss Federal Office of Energy, examines the potential of small hydro and the various political, technical and economic influences on such projects. Further articles provide an overview of the various types of small hydro schemes, including power generation using height differences in drinking-water and wastewater installations. As far as the components of small hydro schemes are concerned, various types of turbines and further system components that are needed are examined. A further article takes a look at the small hydro market and the market players involved. Ecological aspects and research activities are discussed in further articles. In a second interview with Martin Boelli, presently responsible for small hydropower at the Swiss Federal Office of Energy, the unused potential for the use of hydropower in Switzerland is discussed. Examples of small-scale hydro schemes are examined and the support offered by the Small Hydropower Program is discussed. Finally the question is asked, if the small hydro market in Switzerland is overheated as a result of promotion schemes such as cost-covering remuneration for electricity from renewable energy sources.

  2. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  3. Role of pump hydro in electric power systems

    Science.gov (United States)

    Bessa, R.; Moreira, C.; Silva, B.; Filipe, J.; Fulgêncio, N.

    2017-04-01

    This paper provides an overview of the expected role that variable speed hydro power plants can have in future electric power systems characterized by a massive integration of highly variable sources. Therefore, it is discussed the development of a methodology for optimising the operation of hydropower plants under increasing contribution from new renewable energy sources, addressing the participation of a hydropower plant with variable speed pumping in reserve markets. Complementarily, it is also discussed the active role variable speed generators can have in the provision of advanced frequency regulation services.

  4. How can small hydro energy and other renewable energy mitigate impact of climate change in remote Central Africa: Cameroon case study.

    Science.gov (United States)

    Kenfack, Joseph; Bignom, Blaise

    2015-04-01

    Central Africa owns important renewable energy potential, namely hydro, solar and biomass. This important potential is still suffering from poor development up to the point where the sub region is still abundantly using the fossil energy and biomass as main power source. This is harmful to the climate and the situation is still ongoing. The main cause of the poor use of renewable energy is the poor management of resources by governments who have not taken the necessary measures to boost the renewable energy sector. Since the region is experiencing power shortage, thermal plants are among other solutions planned or under construction. Firewood is heavily used in remote areas without a sustainability program behind. This solution is not environment friendly and hence is not a long term solution. Given the fact that the region has the highest hydro potential of the continent, up to one-quarter of the world's tropical forest, important oil production with poor purchase power, the aim of this paper is to identify actions for improved access to sustainable, friendly, affordable energy services to users as well as a significant improvement of energy infrastructure in Central Africa and the promotion of small hydro and other renewable energy. The work will show at first the potential for the three primary energy sources which are solar, biomass and hydro while showing where available the level of development, with an emphasis on small hydro. Then identified obstacles for the promotion of clean energy will be targeted. From lessons learned, suggestions will be made to help the countries develop an approach aiming at developing good clean energy policy to increase the status of renewable energy and better contribute to fight against climate change. Cameroon has a great renewable energy potential and some data are available on energy. From the overview of institutional structure reform of the Cameroon power sector and assessments, specific suggestions based on the weaknesses

  5. 78 FR 62350 - Lock+ Hydro Friends Fund III, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14540-000] Lock+ Hydro Friends Fund III, LLC; Western Minnesota Municipal Power Agency; Notice...+ Hydro Friends Fund III, LLC for Project No. 14539-000 and Western Minnesota Municipal Power Agency for... CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the...

  6. 78 FR 70549 - Lock+ Hydro Friends Fund III, LLC, Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-11-26

    .... 14540-000] Lock+ Hydro Friends Fund III, LLC, Western Minnesota Municipal Power Agency; Notice...+ Hydro Friends Fund III, LLC for Project No. 14539-000 and Western Minnesota Municipal Power Agency for... CFR.385.2001(a)(2) (2013). On November 25, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the...

  7. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  8. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  9. Hydrologic design methodologies for small-scale hydro at ungauged sites. Phase 2A, British Columbia. Summary report. Integrated method for power analysis (IMP)

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Analysis of the feasibility of sites for small-scale hydroelectric power generation in British Columbia can be a difficult process in cases where gauged streamflow data are not available. This report outlines the capabilities of a package of computer programs, designed to aid the planner of small-scale hydro projects in evaluating the hydrology and energy potential of ungauged sites in that province. The programs were developed by using appropriate programming and hydrological research that had already been done, and taking advantage of experience already available from previous use of components of the package. As the province's mountainous terrain, with numerous microclimates, precluded use of methods of regional analysis based on regression or comparison with gauged streams, the package was developed on the basis of a conceptual model of physical processes on the land and in the atmosphere. The resulting package, the Integrated Method for Power Analysis, consists of five basic components: an atmospheric model of annual precipitation and one-in-ten-year 24-h maximum rainfall; a watershed model that will generate streamflow data based on information from the atmospheric model; a flood frequency analysis system that uses site-specific topographic information and information from the atmospheric model to generate a flood frequency curve; a hydroelectric power simulation program which determines the daily energy output for a run-of-river or reservoir storage site; and a graphics analysis package that provides direct visualization of atmospheric and streamflow data, and the results of watershed and power simulation modelling. 2 figs., 1 tab.

  10. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1997-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  11. Technical and economic aspects of operation of thermal and hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Bjoern Harald

    1998-12-31

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs.

  12. Technical and economic aspects of operation of thermal and hydro power systems

    International Nuclear Information System (INIS)

    Bakken, Bjoern Harald.

    1997-01-01

    This thesis studies system operation and operational costs of primary and secondary control in hydro and thermal power systems. The cost of providing primary control reserves in thermal power systems is estimated to 1-3% of total production cost. Hydro power units, on the other hand, provide a very cheap primary reserve compared to thermal units. The HVDC (High Voltage Direct Current) connection can be used for primary control in either direction but the thesis only considers substitution of reserves in the thermal system with reserves from the hydro system. Since the HVDC connection is easy to control, the transient characteristics are considerably improved, and one can substitute an amount of thermal spinning reserve corresponding to the available HVDC capacity with little disturbance in any system. A more realistic alternative, at present, is to sell secondary control reserves across the HVDC connections. Keeping spinning reserve for automatic secondary control in a thermal power system is estimated to cost 3-5% of total production cost. Secondary control reserves probably cannot compete with the value of the peak load export, but one should seriously consider using part of the HVDC capacity as secondary control reserve for the thermal system during off-peak hours with. The author discusses the concept of automatic secondary control both theoretically and by simulations and finds that there are no special technical difficulties in introducing automatic secondary control in the Nordel (an organization for Nordic power cooperation) system. 78 refs., 4 figs., 23 tabs

  13. A long-term analysis of pumped hydro storage to firm wind power

    International Nuclear Information System (INIS)

    Foley, A.M.; Leahy, P.G.; Li, K.; McKeogh, E.J.; Morrison, A.P.

    2015-01-01

    Highlights: • This is a long term generation analysis of a high wind power system. • A high CO 2 and fossil fuel price is closest to Ireland’s EU ETS 2020 target. • New pumped storage to firm wind is limited unless strong market costs exist. • Reserve for wind power show that ancillary services are relevant for balancing. - Abstract: Although pumped hydro storage is seen as a strategic key asset by grid operators, financing it is complicated in new liberalised markets. It could be argued that the optimum generation portfolio is now determined by the economic viability of generators based on a short to medium term return on investment. This has meant that capital intensive projects such as pumped hydro storage are less attractive for wholesale electricity companies because the payback periods are too long. In tandem a significant amount of wind power has entered the generation mix, which has resulted in operating and planning integration issues due to wind’s inherent uncertain, varying spatial and temporal nature. These integration issues can be overcome using fast acting gas peaking plant or energy storage. Most analysis of wind power integration using storage to date has used stochastic optimisation for power system balancing or arbitrage modelling to examine techno-economic viability. In this research a deterministic dynamic programming long term generation expansion model is employed to optimise the generation mix, total system costs and total carbon dioxide emissions, and unlike other studies calculates reserve to firm wind power. The key finding of this study is that the incentive to build capital-intensive pumped hydro storage to firm wind power is limited unless exogenous market costs come very strongly into play. Furthermore it was demonstrated that reserve increases with increasing wind power showing the importance of ancillary services in future power systems

  14. Estimation of small-scale hydroelectric power plant costs; Estimacao de custos de PCH

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Silva, Benedito Claudio da [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  15. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  16. Fuzzy interpolation of hydro power sales data in Simulink

    DEFF Research Database (Denmark)

    Jantzen, Jan; Eliasson, B.

    1994-01-01

    The problem in this case study can be described as a multi-dimensional surface fit to a given set of data. The data are sales figures in MWH/H for a hydro-thermal power generation system. The data are incomplete and not totally reliable. A model with ten fuzzy rules fits the data with a total error...

  17. Frequency Regulation of a Hybrid Wind–Hydro Power Plant in an Isolated Power System

    Directory of Open Access Journals (Sweden)

    Guillermo Martínez-Lucas

    2018-01-01

    Full Text Available Currently, some small islands with high wind potential are trying to reduce the environmental and economic impact of fossil fuels by using renewable resources. Nevertheless, the characteristics of these renewable resources negatively affect the quality of the electrical energy, causing frequency disturbances, especially in isolated systems. In this study, the combined contribution to frequency regulation of variable speed wind turbines (VSWT and a pump storage hydropower plant (PSHP is analyzed. Different control strategies, using the kinetic energy stored in the VSWT, are studied: inertial, proportional, and their combination. In general, the gains of the VSWT controller for interconnected systems proposed in the literature are not adequate for isolated systems. Therefore, a methodology to adjust the controllers, based on exhaustive searches, is proposed for each of the control strategies. The control strategies and methodology have been applied to a hybrid wind–hydro power plant on El Hierro Island in the Canary archipelago. At present, in this isolated power system, frequency regulation is only provided by the PSHP and diesel generators. The improvements in the quality of frequency regulation, including the VSWT contribution, have been proven based on simulating different events related to wind speed, or variations in the power demand.

  18. Comparison of Ontario Hydro's performance with world power reactors - 1981

    International Nuclear Information System (INIS)

    Dumka, B.R.

    1982-04-01

    The performance of Ontario Hydro's CANDU reactors in 1981 is compared with that of 123 world nuclear power reactors rated at 500 MW(e) or greater. The report is based on data extracted from publications, as well as correspondence with a number of utilities. The basis used is the gross capacity factor, which is defined as gross unit generation divided by the perfect gross output for the period of interest. The lowest of the published turbine and generator design ratings is used to determine the perfect gross output, unless the unit has been proven capable of consistently exceeding this value. The first six reactors in the rankings were CANDU reactors operated by Ontario Hydro

  19. Effect of turbine materials on power generation efficiency from free water vortex hydro power plant

    International Nuclear Information System (INIS)

    Sritram, P; Treedet, W; Suntivarakorn, R

    2015-01-01

    The objective of this research was to study the effect of turbine materials on power generation efficiency from the water free vortex hydro power plant made of steel and aluminium. These turbines consisted of five blades and were twisted with angles along the height of water. These blades were the maximum width of 45 cm. and height of 32 cm. These turbines were made and experimented for the water free vortex hydro power plant in the laboratory with the water flow rate of 0.68, 1.33, 1.61, 2.31, 2.96 and 3.63 m 3 /min and an electrical load of 20, 40, 60, 80 and 100 W respectively. The experimental results were calculated to find out the torque, electric power, and electricity production efficiency. From the experiment, the results showed that the maximum power generation efficiency of steel and aluminium turbine were 33.56% and 34.79% respectively. From the result at the maximum water flow rate of 3.63 m 3 /min, it was found that the torque value and electricity production efficiency of aluminium turbine was higher than that of steel turbine at the average of 8.4% and 8.14%, respectively. This result showed that light weight of water turbine can increase the torque and power generation efficiency. (paper)

  20. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  1. Mini hydro power in Peninsular Malaysia - the past, present and future

    International Nuclear Information System (INIS)

    Bhaskar Kannan

    2006-01-01

    The early development of mini hydro development in Peninsular Malaysia was carried out by the National Electricity Board (NEB) and the projects developed in the 50s and 60s were Ulu Langat (Selangor), Sempam, Kg. Raja , Kuala Terla, and Robinson Falls (all in Pahang). In the 70s the main effort of hydropower development was concentrated on developing major hydropower projects not only to cater to the country increasing demand for electricity but also to the country needs for flood control. This development was feverishly carried out on the Perak River and the prohects built were Temenggor (384 MW), Bersia (72 MW), Kenering (20 MW), Sg Piah (70 MW) and the Kenyir (400 MW) project in Sungai Terengganu. In late 1970s, the government was keen to electrify the rural areas of Peninsular Malaysia and mini hydro power development was thought of as an option to provide electricity to these areas. The Mini Hydro Department of National Electricity Board (MHD) was then formed to undertake the task of planning, developing and implementing mini hydro projects to meet this government aspiration. Table 1 shows the list of projects identified and implemented and its status

  2. Fishy Business: Response of Stream Fish Assemblages to Small Hydro-power Plant Induced Flow Alteration in the Western Ghats, Karnataka

    Science.gov (United States)

    Rao, S. T.; Krishnaswamy, J.; Bhalla, R. S.

    2017-12-01

    Alteration of natural flow regimes is considered as a major threat to freshwater fish assemblages as it disturbs the water quality and micro-habitat features of rivers. Small hydro-power (SHP), which is being promoted as a clean and green substitute for large hydro-power generation, alters the natural flow regime of head-water streams by flow diversion and regulation. The effects of altered flow regime on tropical stream fish assemblages, driven by seasonality induced perturbations to water quality and microhabitat parameters are largely understudied. My study examined the potential consequences of flow alteration by SHPs on fish assemblages in two tributaries of the west-flowing Yettinahole River which flows through the reserved forests of Sakleshpur in the Western Ghats of Karnataka. The flow in one of the tributaries followed natural flow regime while the other comprised three regimes: a near-natural flow regime above the dam, rapidly varying discharge below the dam and a dewatered regime caused by flow diversion. The study found that the altered flow regime differed from natural flow regime in terms of water quality, microhabitat heterogeneity and fish assemblage response, each indicative of the type of flow alteration. Fish assemblage in the natural flow regime was characterized by a higher catch per site, a strong association of endemic and trophic specialist species. The flow regime above the dam was found to mimic some components of the natural flow regime, both ecological and environmental. Non endemic, generalist and pool tolerant species were associated with the dewatered regime. There was a lack of strong species-regime association and an overall low catch per site for the flow regulated regime below the dam. This study highlights the consequences of altered flows on the composition of freshwater fish assemblages and portrays the potential of freshwater fish as indicators of the degree and extent of flow alteration. The study recommends the need for

  3. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  4. 78 FR 62350 - FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14491-000] FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing... applications were filed by FFP Qualified Hydro 14, LLC for Project No. 13579-002 and Western Minnesota... regular business day. See 18 CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time...

  5. Manitoba Hydro's earth power program and Manitoba market update

    International Nuclear Information System (INIS)

    Pearson, K.

    2005-01-01

    An outline of Manitoba Hydro's Earth Power program was presented. Details of the heat pump market in Manitoba were provided, including details of residential and commercial sales. Total residential heat pump sales amounted to 577 units in 2004, equivalent to over $11.2 million in sales. Commercial installations amounted to approximately $12.7 million. An outline of industry players was presented. The goals of Manitoba Hydro were outlined in relation to geothermal energy and the Power Smart program. Their objectives included increasing awareness of geothermal energy, making heat pumps more accessible, and improving industry infrastructure. Other objectives included educating the public about life-cycle cost implications, residential loans and commercial incentives. To date, the residential power loan has provided financing to over 300 Manitoba home owners for installations, with electrical savings of over 1.34 Gwh and natural gas savings of 279,425 m 3 . The program is also committed to providing assistance with feasibility studies. Provincial tax credits for the Earth Program included a 10 per cent deduction of geothermal heat pump purchases from corporation income tax. Case studies of the program were presented along with an outline of the geothermal heat pump for homes booklet. Details of the residential earth power loan were provided, including details of installation, system completion and approval processes. Awards and accolades for the program include the 2004 HRAI Education supporter award and recognition by the David Suzuki Foundation, which highlighted the program as a national leader in encouraging and facilitating the use of GeoExchange technology. tabs, figs

  6. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  7. Dynamic modeling, simulation and control design of an advanced micro-hydro power plant for distributed generation applications

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, J.L. [Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Molina, M.G. [CONICET, Instituto de Energia Electrica, Universidad Nacional de San Juan, Av. Libertador San Martin Oeste 1109, J5400ARL San Juan (Argentina); Pacas, J.M. [Institut fuer Leistungselektronik und Elektrische Antriebe, Universitaet Siegen, Fachbereich 12 Hoelderlinstr 3, D 57068 Siegen (Germany)

    2010-06-15

    A small-scale hydropower station is usually a run-of-river plant that uses a fixed speed drive with mechanical regulation of the turbine water flow rate for controlling the active power generation. This design enables to reach high efficiency over a wide range of water flows but using a complex operating mechanism, which is in consequence expensive and tend to be more affordable for large systems. This paper proposes an advanced structure of a micro-hydro power plant (MHPP) based on a smaller, lighter, more robust and more efficient higher-speed turbine. The suggested design is much simpler and eliminates all mechanical adjustments through a novel electronic power conditioning system for connection to the electric grid. In this way, it allows obtaining higher reliability and lower cost of the power plant. A full detailed model of the MHPP is derived and a new three-level control scheme is designed. The dynamic performance of the proposed MHPP is validated through digital simulations and employing a small-scale experimental set-up. (author)

  8. Refurbishment of small hydropower plants in Romania; Sanierung von Kleinwasserkraftwerken in Rumaenien

    Energy Technology Data Exchange (ETDEWEB)

    Gmeinbauer, Joerg [Wien Energie GmbH, Wien (Austria)

    2010-07-01

    In 2008 Wien Energie subsidiary Wienstrom GmbH participated in three public auctions of Hidroelectrica S.A. for the sale of old small hydro power plants in Romania. Together with strategic partners Wienstrom could successfully compete against local and international competition and acquired 31 small hydro power plants with a total installed capacity of around 20 MW. The plants were integrated into the newly established Vienna Energy Forta Naturala Srl. and are being completely refurbished at the moment. Wien Energie consequently is already the third largest operator of small hydro power plants in Romania. (orig.)

  9. Conceptual design of planetary gearbox system for constant generator speed in hydro power plant

    Directory of Open Access Journals (Sweden)

    Bhargav

    2018-01-01

    Full Text Available Micro Hydro Power Plant (MHPP is emerging as one of the most clean, renewable and reliable energy technology for harnessing power. In MHPP hydro governors are avoided, that results in turbine speed fluctuation. MHPP requires either speed or torque amplification of generator for constant power generation. To achieve this, planetary gear transmission system is explored for MHPP due to its higher efficiency and compact size. A conceptual planetary gearbox system is developed for MHPP to maintain constant generator speed. The conceptual gearbox is designed, modelled and analysed using ADAMS software. Simulation results are found to be in close agreement with analytical results. Hence, conceptual design of planetary gearbox can be used to govern constant generator speed. In this paper, a MHPP which generate constant power of 5 kW at constant generator speed of 1490 rpm is analysed and validated

  10. Complementarity of hydro and wind power: Improving the risk profile of energy inflows

    International Nuclear Information System (INIS)

    Denault, Michel; Dupuis, Debbie; Couture-Cardinal, Sebastien

    2009-01-01

    The complementarity of two renewable energy sources, namely hydro and wind, is investigated. We consider the diversification effect of wind power to reduce the risk of water inflow shortages, an important energy security concern for hydropower-based economic zones (e.g. Quebec and Norway). Our risk measure is based on the probability of a production deficit, in a manner akin to the value-at-risk, simulation analysis of financial portfolios. We examine whether the risk level of a mixed hydro-and-wind portfolio of generating assets improves on the risk of an all-hydro portfolio, by relaxing the dependence on water inflows and attenuating the impact of droughts. Copulas are used to model the dependence between the two sources of energy. The data considered, over the period 1958-2003, are for the province of Quebec, which possesses large hydro and wind resources. Our results indicate that for all scenarios considered, any proportion of wind up to 30% improves the production deficit risk profile of an all-hydro system. We can also estimate the value, in TW h, of any additional one percent of wind in the portfolio. (author)

  11. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  12. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  13. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  14. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  15. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  16. Small-scale hydro-electric scheme in Roches, Switzerland

    International Nuclear Information System (INIS)

    Hausmann, M.

    2006-01-01

    The small hydropower plant (SHPP) project 'PCH Roches' is planned to be built in Roches, a small village located in the Jura region of the canton of Bern. The goal of this undertaking is to reactivate a site with hydro potential of the river Birs on a section that was already well exploited by some ancient SHPP (since 1953 or probably even earlier). Several modifications were performed on this plant over the years; not all contributed positively on its production figures. Following a transfer of the water rights in 1987, claims became loud against the owner to perform maintenance on the river banks and to modify the weir such that a free passage for the fishes will be granted. Those issues contributed to inflate a conflict which ended in the repeal of the water rights and a total plant shut down in 2001. The new project plans to reuse the existing pen stock and to carry out some refurbishing activities to grant security and better performance. The weir and the intake structure are also redesigned such that the water storage can be somewhat raised for normal operation; a weir gate will however allow to better discharge the river in flood situations. A new turbine house will be erected at the current location where the tail water pen stock rejoins the river. Hence, the existing old turbine house will be obsolete and the upper and lower pen stock sections are to be linked with each other. Limited by the existing pen stock size, the new plant is expected to produce some 50 kW power and 362,000 kWh/year. This represents an increase in energy generation of around 200% compared with the ancient SHPP. Gross head is 5.38 m, net head 4.12 m with a turbine flow of at least 1.6 m 3 /s. The expected energy sales price applicable to this project reaches about 0.17 CHF/kWh as per the current tariffs set by the grid owner. This project calls for the building of a state-of-the-art SHPP. It will avoid the total dismantling of the existing works to take place and allow the small

  17. Pico hydro power for rural electrification in developing countries

    International Nuclear Information System (INIS)

    Maher, P.; Smith, N.P.A.; Williams, A.A.

    1998-01-01

    Pico hydro power is a renewable energy system which has the potential to provide millions of rural people world-wide with a cheap, sustainable source of electricity. The development of new, cost-reducing approaches, including local manufacture and implementation in developing countries, has increased the accessibility of this technology to large numbers of people. The new approaches are investigated and some of the present constraints to wider adoption of this technology are analysed. (Author)

  18. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  19. Projects for small hydro-power installations in the Canton of Uri, Switzerland; Kanton Uri. Projekte fuer Kleinwasserkraftwerke - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    This report for the Swiss Federal Office of Energy (SFOE) on a preliminary study presents and discusses small-hydro projects at three locations in the Swiss Canton of Uri. Three of originally six potential locations were selected for further investigation. Factors such as the usable quantities of water available at the locations are discussed. The projects Brunnital, Gruonbach and Palanggenbach are discussed in detail. Water quantities and various components of the installations such as water intakes, de-sanding installations, pressure conduits, machine houses and tailrace channels are described, as is the electro-mechanical equipment proposed. Also, environmental aspects are dealt with. Annual electricity production and economic viability are further topics covered in the report.

  20. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  1. Electronic Control Of Small Hydro-Generators Part II

    International Nuclear Information System (INIS)

    Diaz B, Pedro; Torres M, Carlos A.

    1994-01-01

    The present project arises for the Colombian population's necessity to overcome the underdevelopment, the poverty, the education and the level of life in rural areas of difficult access, for an economic rural electrification. The UIS, by means of the advisory committee of investigations of the ability of Physical-mechanical Sciences and the ability of Electricity and Electronic, it begins the process of developing in 1991 a study of economic and reliable control for the handling of small micro-centrals. Providing from electric power to the rural sector is a world problem, and have more than enough this some countries (China, Nepal, Peru, The islands of Papua, New Guinea), they have made investigations, outlining and building central micro controlled by microprocessor. The present study is developed with the objective of carrying out a load control that acts reliable and quickly. Traditionally they have been come using mechanical governors, which are those in charge of making the load control by means of valves that regulate the flow of water in the turbines, involving this way big retards characteristic of any mechanical control. In summary, the electronic governor of load presents on the mechanical governor, the advantage of acting to more speed and consequently to maintain stable the frequency of the system. To continue with the study, the objective that this project must develop, is an electronic control of load which presents to a small hydro generator, a relatively constant and independent electric load that the demanded consumption for the user varies from none to full load, given as initial parameters a constant flow in the turbine and a control in the line tension. This way it seeks to improve the energy quality given by isolated generators

  2. A Risk Analysis of Small-Hydro Power (SHP Plants Investments

    Directory of Open Access Journals (Sweden)

    Jorge Cunha

    2014-06-01

    Full Text Available The increase in electricity consumption has led to a sharp increase in energy demand which rose environmental and sustainability concerns. To address this issue, there has been an incentive to resource to renewable energy sources for electricity production. Departing from a real case study, the investment appraisal of a SHP project under the present market conditions is described, followed by a sensitivity analysis in order to identify the main sources of risk. The main results obtained showed that in the context of a regulated tariff the project is worthwhile due to a positive NPV. However, if electricity had to be sold at market prices, the project becomes unprofitable. Theresults put also in evidence the vulnerability of the investment to an adverse change in interest rates. Future SHP plant investments should take into account the need to operate in a free market and to compete with technologies based on fossil fuels or large hydro.

  3. Micro-hydro power in the UK: The role of communities in an emerging energy resource

    International Nuclear Information System (INIS)

    Bracken, L.J.; Bulkeley, H.A.; Maynard, C.M.

    2014-01-01

    Research around micro-hydro power is focused on technical aspects with limited understanding of the social organisation and environmental implications. We examine the ways in which micro-hydro is engaged by people and organisations as a means of contributing to the UK's policy ambition for renewable energy. We bring to the fore the way in which expertise is used and contested. A web based review of micro-hydro schemes in the UK was undertaken and a detailed evaluation of two schemes in the North of England was conducted to determine how expertise and contestation figures in community schemes. Results demonstrate a rapid expansion of micro-hydro in the UK. Ownership/control is highly ‘community based’. Until now research around micro-hydro has been dominated by technical approaches with schemes defined in terms of hardware. We propose a third dimension to Walker and Cass's (2007) classification of renewable energy developments: the environmental dimension. We suggest this dimension of micro-hydro is critical, both in terms of the extent to which resources can be realised but also the ways in which it might attract controversy, in particular around how expertise is used and valued. - Highlights: • Analysis of micro-hydro schemes in the UK demonstrates a recent rapid expansion. • We propose a third dimension to renewable energy developments: the environmental dimension. • The environmental dimension of micro-hydro determines how resources are realised. • Environmental features underpin the controversy which can emerge around schemes. • The ownership of micro-hydro schemes is highly ‘community based’

  4. Sustainability Challenge of Micro Hydro Power Development in Indonesia

    Science.gov (United States)

    Didik, H.; Bambang, P. N.; Asep, S.; Purwanto, Y. A.

    2018-05-01

    Rural electrification using renewable energy is the best choice for many locations that far away from national grid. Many renewable energy project have been built for rural electrification such as micro hydro power plant (MHPP) and solar photovoltaic (SPV). Sustainability still the main challenge of off-grid renewable energy development for off-grid rural electrification in Indonesia. The objective of this paper is to review sustainability of micro hydro power development in Indonesia. The research method was done by field observation, interview with MHPP management, and reviewing some research about MHPP in Indonesia. Sustainability issues include various aspects that can be classified into 5 dimensions: technical, economic, socio-cultural, institutional, and environmental. In technical factors that lead to sustainability problem are: improper MHPP design and construction, improper operation and maintenance, availability of spare parts and expertise. In the economic dimension are generally related to: low electricity tariff and utilization of MHPP for productive use. In the social dimension are: the growth of consumer’s load exceeding the capacity, reduced number of consumers, lack of external institutional support. In the institutional side, it is generally related to the ability of human resources in managing, operating and maintaining of MHPP. Environmental factors that lead the sustainability problems of MHPP are: scarcity of water discharge, conflict of water resources, land conversion over the watershed, and natural disasters.

  5. New construction of the Wespimuehle small hydro power station in Winterthur, Switzerland; Stadt Winterthur (ZH). Neubau Kleinwasserkraftwerk Wespimuehle - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents a project concerning the renewal of an existing small hydro installation in the historical Wespimuehle on the Toess river in Winterthur, Switzerland. The existing installation is described as is the station's present concession. The proposals for the renewal of this installation are described and discussed, including water intake, electro-mechanical components and the station's tail water channel. The necessary building work and access to the installations are discussed. Investment, operating and maintenance costs are discussed. The expected profits to be gained from the new installation and the risks involved in the project are discussed.

  6. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  7. Report and recommendations in the matter of British Columbia Hydro and Power Authority and an inquiry into a Heritage Contract for British Columbia Hydro and Power Authority's existing generation resources and regarding stepped rates and transmission access

    International Nuclear Information System (INIS)

    Hobbs, R.H.; Hall, K.L.; Bradley, P.G.

    2003-01-01

    Under British Columbia's new energy plan, the BC Utilities Commission made recommendations on two main policy initiatives regarding regulation of BC Hydro. The first involved a Heritage Contract that would ensure any benefits attributable to the existing low-cost generation of BC Hydro would be secured for British Columbians. The Heritage Contract had the support of all participants. The proposal was based on the revenue required by Generation to meet the cost of supplying the energy of Heritage Resources to Distribution. The second recommendation involved a stepped rate structure for large commercial and industrial customers to encourage a more efficient use of energy resources and private investments in new generation. It also recommends concurrent implementation of time-of-use rates. BC Hydro had also proposed a significant change in the determination and disposition of Trade Income between BC Hydro and Powerex. The agreement stipulated that Trade Income would no longer include revenues from the sale of surplus power, except for profits realized by Powerex after paying BC Hydro an indexed price for surplus power. All Trade income up to $200 million would accrue to the ratepayers. This report presents 3 alternatives to the Trade Income proposal and several others recommendations dealing with transmission voltage customers and generation access, legislation, regulation and special directions. The report identified a schedule for implementation of retail access by the end of 2004. 9 appendices

  8. Possibilities for construction of small hydroelectric power plants in the Republic of Bulgaria

    International Nuclear Information System (INIS)

    Iliev, S.; Angelov, M.; Stojkov, S.; Lefterov, B.

    2001-01-01

    The hydroenergy potential of Bulgaria and its utilization until 2000 is discussed. An assessment is made of the possibilities of the use of additional micro-hydroenergy potential (the preliminary evaluation gives about 1.3 bill. kWh/y with total power 250 MW). In the National Strategy for the development, use and preservation of water in Bulgaria till 2020 it is envisioned 60 micro HPP with power of 36 MW power to be constructed. The Program for hydro energy to 2010 envisioned including of private investments if the construction, buying up the electric energy by the National Electric Company and two-stage construction of the cascade 'Sreden Iskyr' with 10 small NPPs. The necessity of the development of a Manual of express investigation and design of small NPP is substantiated

  9. Retrofitting of the small hydro electric scheme 'Moulin d'en Bas' in Cronay, Switzerland - Preliminary project

    International Nuclear Information System (INIS)

    2007-09-01

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the retrofitting of the small hydro electric scheme 'Moulin d'en Bas' located in Cronay on the Mentue river, Switzerland. Two variants are considered. In the first one the existing scheme uses a 4.72 m water fall and its power amounts to about 25 kW. A 4-blades Kaplan turbine is foreseen to generate 160,000 kWh/y. In the second variant, weir and penstock have to be adapted in order to take advantage of the full 6.74 m water fall indicated in the water-use concession granted in 1952. A new fish pass has to be built as well. The resulting electric power is in this case 80 kW and the power generation by the turbo group 353,000 kWh/y, about 60% of which in the wintertime. Electricity production cost is estimated to be 0.282 CHF/kWh in the second variant.

  10. Mid and long-term optimize scheduling of cascade hydro-power stations based on modified GA-POA method

    Directory of Open Access Journals (Sweden)

    J. Li

    2018-06-01

    Full Text Available In this paper, to explore the efficiency and rationality of the cascade combined generation, a cascade combined optimal model with the maximum generating capacity is established, and solving the model by the modified GA-POA method. It provides a useful reference for the joint development of cascade hydro-power stations in large river basins. The typical annual runoff data are selected to calculate the difference between the calculated results under different representative years. The results show that the cascade operation of cascaded hydro-power stations can significantly increase the overall power generation of cascade and ease the flood risk caused by concentration of flood season.

  11. Optimal sizing of utility-scale photovoltaic power generation complementarily operating with hydropower: A case study of the world’s largest hydro-photovoltaic plant

    International Nuclear Information System (INIS)

    Fang, Wei; Huang, Qiang; Huang, Shengzhi; Yang, Jie; Meng, Erhao; Li, Yunyun

    2017-01-01

    Highlights: • Feasibility of complementary hydro-photovoltaic operation across the world is revealed. • Three scenarios of the novel operation mode are proposed to satisfy different load demand. • A method for optimally sizing a utility-scale photovoltaic plant is developed by maximizing the net revenue during lifetime. • The influence of complementary hydro-photovoltaic operation upon water resources allocation is investigated. - Abstract: The high variability of solar energy makes utility-scale photovoltaic power generation confront huge challenges to penetrate into power system. In this paper, the complementary hydro-photovoltaic operation is explored, aiming at improving the power quality of photovoltaic and promoting the integration of photovoltaic into the system. First, solar-rich and hydro-rich regions across the world are revealed, which are suitable for implementing the complementary hydro-photovoltaic operation. Then, three practical scenarios of the novel operation mode are proposed for better satisfying different types of load demand. Moreover, a method for optimal sizing of a photovoltaic plant integrated into a hydropower plant is developed by maximizing the net revenue during lifetime. Longyangxia complementary hydro-photovoltaic project, the current world’s largest hydro-photovoltaic power plant, is selected as a case study and its optimal photovoltaic capacities of different scenarios are calculated. Results indicate that hydropower installed capacity and annual solar curtailment rate play crucial roles in the size optimization of a photovoltaic plant and complementary hydro-photovoltaic operation exerts little adverse effect upon the water resources allocation of Longyangxia reservoir. The novel operation mode not only improves the penetration of utility-scale photovoltaic power generation but also can provide a valuable reference for the large-scale utilization of other kinds of renewable energy worldwide.

  12. The micro hydraulic power, a sure value

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    The micro hydroelectricity is a proven technology which has now reached maturity. Ideal for electrification of remote sites, it also serves a complement to national electric production. A recent study carried out by the ESHA estimates the potential which still available in terms of micro hydraulic power plants at 5939 MW. The small hydro power capacity (>10 MW) installed in European union and the available potential of small hydro power are presented. (A.L.B.)

  13. Comparison of simulated and measured response of load rejection on A hydro power plant model with mixed mode nonlinear controller

    Energy Technology Data Exchange (ETDEWEB)

    Babunski, Darko; Tuneski, Atanasko; Zaev, Emil [Faculty of Mechanical Engineering, ' Ss. Cyril and Methodius' University, Skopje (Macedonia, The Former Yugoslav Republic of)

    2014-07-01

    Revised Hydro Power Plant model of the IEEE working group recommended converted to state space model is used for simulation of transient response of hydro turbine, and verification was made using measurements of transients from real Hydro Power Plant (HPP). Nonlinear mixed model controller was designed and implemented into complete HPP simulation model and compared with PID with real parameters used in HPP, and with adjusted PID parameters with consideration of smallest frequency error. Verification of performance of the model was made comparing model response with measured load rejection, which is worst case of HPP operation. (Author)

  14. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  15. Small-scale hydro power: from theory to practice - 15 international manufacturers implement MHyLab hydraulic profiles; Petite hydroelectricite: de la theorie a la pratique. 15 constucteurs internationaux ont recours aux profils hydrauliques de MHyLab

    Energy Technology Data Exchange (ETDEWEB)

    Denis, V. [MHyLab, Montcherand (Switzerland)

    2010-07-01

    This article takes a look at MHyLab, the Research and Development Laboratory for Small-scale Hydropower Turbines in Montcherand, Switzerland. Founded in 1996 this laboratory develops tailored hydraulic turbines for small-scale hydro power plants. Three types of turbines were modeled and tested on MHyLab test rig: Pelton turbines for hydraulic heads between 60 and 700 m; axial turbines of the Kaplan type for 1 to 30 m heads; diagonal turbines for 25 to 100 m heads. Up to 2010, 15 manufacturers from Switzerland, France, Germany, New Zealand and Japan have used hydraulic profiles developed by MHyLab. 70 turbines have been manufactured and installed, the total power of which is about 38 MW. Their total annual production is estimated to 189 GWh. The illustrated article describes the methodology followed by MHyLab and some of its realisations in Switzerland and Jordan.

  16. Retrofitting the small-scale hydro power plant of Chable, municipality of Vionnaz, Switzerland - Feasibility study; Rehabilitation de la petite centrale de Chable, Commune de Vionnaz (VS) - Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-15

    A small-scale 200 kW hydro power plant has been installed 1988 on the drinking water supply system of the municipality of Vionnaz, Switzerland. It uses the elevation difference of 700 m between the springs in the mountains and the village in the Rhone river valley. A full refurbishment is suggested to improve the system efficiency and increase the water volume delivered to the turbine. The current status of the system has been evaluated. The replacement of the turbine is proposed. The water supply network of the mountain resort of Torgon located on the territory of Vionnaz should be connected to the existing reservoir ahead of the penstock. The penstock itself should be partly or totally replaced. In this way the yearly power production of 1,430 MWh could be increased by up to a factor of 2 at the attractive cost of CHF 0.06 to 0.09 per kWh, depending on the implemented variant.

  17. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  18. Power system data communication architecture at BC Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Struyk, E.

    2001-07-01

    Development of a power system data communication architecture (PSDCA) at British Columbia Hydro that enables authorized corporate users to access station-intelligent electronic devices (IEDs) for power system data in non real-time, without compromising the reliability and availability of the real-time SCADA systems, is described. Also discussed is the development of major upgrade initiatives for expanding the use of intelligent electronic devices and remote terminal units (RTUs) which report to the main System Control Centre at Burnaby, BC, and to the four Area Control Centres located throughout the province. The network architecture that incorporates industry standards for PSDCA also provides an opportunity to existing network security systems against electronic threats such as hackers and saboteurs, beyond the simple methods of single or two-level passwords of existing protection control and monitoring equipment systems. The virtual private network (VPN) technology built into the PSDCA will allow secure access to station IED data by corporate users to access their own power data in a secure and reliable fashion. 4 figs.

  19. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  20. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  1. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  2. Exploring the impact of reduced hydro capacity and lignite resources on the Macedonian power sector development

    Directory of Open Access Journals (Sweden)

    Taseska-Gjorgievskaa Verica

    2014-01-01

    Full Text Available The reference development pathway of the Macedonian energy sector highlights the important role that lignite and hydro power play in the power sector, each accounting for 40% of total capacity in 2021. In 2030, this dominance continues, although hydro has a higher share due to the retirement of some of the existing lignite plants. Three sensitivity runs of the MARKAL-Macedonia energy system model have been undertaken to explore the importance of these technologies to the system, considering that their resource may be reduced with time: (1 Reducing the availability of lignite from domestic mines by 50% in 2030 (with limited capacity of imports, (2 Removing three large hydro options, which account for 310 MW in the business-as-usual case, and (3 Both of the above restrictions. The reduction in lignite availability is estimated to lead to additional overall system costs of 0.7%, compared to hydro restrictions at only 0.1%. With both restrictions applied, the additional costs rise to over 1%, amounting to 348 M€ over the 25 year planning horizon. In particular, costs are driven up by an increasing reliance on electricity imports. In all cases, the total electricity generation decreases, but import increases, which leads to a drop in capacity requirements. In both, the lignite and the hydro restricted cases, it is primarily gas-fired generation and imports that “fill the gap”. This highlights the importance of an increasingly diversified and efficient supply, which should be promoted through initiatives on renewables, energy efficiency, and lower carbon emissions.

  3. Hydro-Quebec strategic plan 2006-2010

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec produces, transmits and distributes electricity through the use of renewable energy sources, particularly hydroelectricity. It also conducts research in energy related fields. This document listed the strategic plan for Hydro-Quebec's 4 main divisions: Hydro-Quebec Production, Hydro-Quebec TransEnergie, Hydro-Quebec Distribution and Hydro-Quebec Energy Society of Bay James. The 2006 to 2010 strategic plan continues to focus on 3 main priorities: energy efficiency; complementary development of hydroelectricity and wind power; and, technological innovation. Hydro-Quebec's objectives also include strengthening the security of Quebec's energy supply and making use of energy as a lever for economic development. The plan for Hydro-Quebec Production calls for accelerating the development of major hydroelectric projects and promoting other renewable forms of energy such as wind power and ensuring the efficiency and reliability of the generating fleet. The utility's objective is to reach 4.7 TWh in energy savings by 2010 and to work toward a target of 8 TWh by 2015. The plan also involves a portfolio of hydroelectric projects totaling 5,400 MW. The plan includes complementary development and integration of 4,000 MW of windpower by 2015. The plan for Hydro-Quebec TransEnergie calls for system reliability and becoming a world benchmark for quality and reliability in wind power integration and deployment of new technologies to enhance performance. The plan for Hydro-Quebec Distribution calls for more efficient use of electricity, increase customer satisfaction and meet electricity needs through the use of renewable energy sources. The utility has made a commitment for 2006 to 2010 to a net income of $2.5 billion per year for a total of $12.5 billion, and a capital investment of 19.4 billion. This paper outlined the contribution of each division to net income and listed the economic benefits for the 2006 to 2010 period. In 2006, the Quebec Energy Board authorized

  4. Micro Hydro-Electric Energy Generation- An Overview

    OpenAIRE

    S. O. Anaza; M. S. Abdulazeez; Y. A. Yisah; Y. O. Yusuf; B. U. Salawu; S. U. Momoh

    2017-01-01

    Energy is required now more than ever due to population growth, industrialization and modernization. Challenges such as carbon dioxide (CO2) emissions and depletion of conventional source of energy necessitate for renewable sources, of which hydro energy seems to be the most predictable. Micro-hydro which is hydro energy in a “small” scale provides electricity to small communities by converting hydro energy into electrical energy. This paper is an overview of micro-hydro system by reviewing s...

  5. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  6. Hydro-Quebec's buyback tariff

    International Nuclear Information System (INIS)

    Richard, J.C.

    1992-01-01

    Hydro-Quebec had an installed electric generation capacity of 25,682 MW in 1990, of which 23,927 MW was hydraulic. Of the 26 thermal power plants, 22 are in remote communities on islands or in the north part of the province. The utility's development plan predicts an annual growth in demand of 2.6% to reach ca 200 TWh in 2006; this demand would be reduced to ca 180 TWh by energy efficiency measures. To increase capacity, Hydro-Quebec can utilize the hydro generation potential of its large rivers, of which 18,000 MW is economically viable, and its small rivers. Of the 10,000 MW theoretical potential of the latter, a large fraction cannot be economically developed under existing conditions. The utility has a policy to purchase energy as a function of the price of fossil fuel. For wind energy, this price was 4.22 cents/kWh in 1991; this price will be increased annually according to the inflation index. In its isolated sites such as the Magdalen Islands, current costs of diesel-generated electricity are at least 5.5 cents/kWh. There are possibilities for installing wind plants in isolated regions but their automatic control systems need to be improved for achieving a larger utilization factor relative to diesel generation and their cost needs to be reduced. 1 tab

  7. Fuzzy logic and its possibility using in automation of small-scale hydroelectric power plants regulation

    International Nuclear Information System (INIS)

    Puskajler, J.

    2004-01-01

    The paper explains how can computer understand and process inaccurate (indefinite) information. It is processing of terms like e.g. 'around in the middle of month' or 'not too big'. Fuzzy logic, fuzzy sets, operations with them, fuzzy rules and using of linguistics variables are explained. The possibilities of application of fuzzy systems in automation of regulation of small-scale hydro power plants are discussed. (author)

  8. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  9. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  10. Analysis of the spontaneous variations in wind power and necessary continuous regulation of hydro-electric and thermal power, related to a future Swedish power system

    Energy Technology Data Exchange (ETDEWEB)

    Holm, J O; Lindstrom, P O

    1982-09-01

    Wind power is unlike conventional electric power generation, since the output fluctuates uncontrollably. These fluctuations must be balanced by controlled generation from other power sources. This will create new and interesting demands on the reserves in the power system. The short-term fluctuations have a low simultaneity factor and must be balanced by an automatic frequency control reserve. In Sweden, this consists of automatically controlled hydro-electric power. The report contains calculations of the amount by which the demand on reserves will increase when wind power is introduced.

  11. 78 FR 71601 - KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2013-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14521-001, 14561-000] KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 13, 2013, KC Scoby...

  12. Energy supply technologies. Hydro, ocean, wave and tidal

    Energy Technology Data Exchange (ETDEWEB)

    Fenhann, J.; Larsen, Hans [Risoe National Lab. - DTU (Denmark)

    2007-11-15

    This chapter presents an overview of current hydro, ocean, wave and tidal initiatives. Large hydro remains one of the lowest-cost generating technologies, although environmental constraints, resettlement impacts and the limited availability of sites have restricted further growth in many countries. Large hydro supplied 16 % of global electricity in 2004, down from 19 % a decade ago. Large hydro capacity totalled about 720 GW worldwide in 2004 and has grown historically at slightly more than 2 % annually. China installed nearly 8 GW of large hydro in 2004, taking the country to number one in terms of installed capacity (74 GW). With the completion of the Three Gorges Dam, China will add some 18.2 GW of hydro capacity in 2009. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic cost of hydro includes displacements and submergence. Further hydro can improve peak-capacity management. Ocean currents, some of which runs close to European coasts, carry a lot of kinetic energy. Part of this energy can be captured by sub-marine windmills and converted into electricity. These are more compact than the wind turbines used on land, simply because water is much denser than air. The main European countries with useful current power potential are France and the UK. Ocean tides are driven by the gravitational pull of the moon. With one high tide every 12 hours, a tidal power plant can operate for only four or five hours per cycle, so power from a single plant is intermittent. A suitably-designed tidal plant can, however, operate as a pimped storage system, using electricity during periods of low demand to store energy that can be recovered later. The only large, modern example of a tidal power plant is the 240 MW La Rance plant, built in France in the 1960s, which represents 91 % of the world tidal power capacity. Wave energy can be seen as

  13. Power Management Based Current Control Technique for Photovoltaic-Battery Assisted Wind-Hydro Hybrid System

    Science.gov (United States)

    Ram Prabhakar, J.; Ragavan, K.

    2013-07-01

    This article proposes new power management based current control strategy for integrated wind-solar-hydro system equipped with battery storage mechanism. In this control technique, an indirect estimation of load current is done, through energy balance model, DC-link voltage control and droop control. This system features simpler energy management strategy and necessitates few power electronic converters, thereby minimizing the cost of the system. The generation-demand (G-D) management diagram is formulated based on the stochastic weather conditions and demand, which would likely moderate the gap between both. The features of management strategy deploying energy balance model include (1) regulating DC-link voltage within specified tolerances, (2) isolated operation without relying on external electric power transmission network, (3) indirect current control of hydro turbine driven induction generator and (4) seamless transition between grid-connected and off-grid operation modes. Furthermore, structuring of the hybrid system with appropriate selection of control variables enables power sharing among each energy conversion systems and battery storage mechanism. By addressing these intricacies, it is viable to regulate the frequency and voltage of the remote network at load end. The performance of the proposed composite scheme is demonstrated through time-domain simulation in MATLAB/Simulink environment.

  14. An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost

    International Nuclear Information System (INIS)

    Yuan, Xiaohui; Tian, Hao; Yuan, Yanbin; Huang, Yuehua; Ikram, Rana M.

    2015-01-01

    Highlights: • Multi-objective hydro-thermal-wind scheduling model (MO-HTWS) is establish. • The extra cost in MO-HTWS problem caused by wind uncertainty is considered. • An extended NSGA-III is proposed to solve MO-HTWS problem. • Constraint handling strategies are presented to modify infeasible solutions. • The feasibility and effectiveness of the proposed method is verified by example. - Abstract: Due to the characteristics of clean and renewable, wind power is significant to economic and environmental operation of electric power system so that it attracts more and more attention from researchers. This paper integrates wind power with hydrothermal scheduling to establish multi-objective economic emission hydro-thermal-wind scheduling problem (MO-HTWS) model with considering wind uncertain cost. To solve MO-HTWS problem with various complicated constraints, this paper extends NSGA-III by introducing the dominance relationship criterion based on constraint violation to select new generation. Moreover, the constraint handling strategy which repairs the infeasible solutions by modifying the decision variables in feasible zone according to the violation amount is proposed. Finally, a daily scheduling example of hydro-thermal-wind system is used to test the ability of NSGA-III for solving MO-HTWS problem. It is concluded from the superior quality and good distribution of the Pareto optimal solutions that, NSGA-III can offer an efficient alternative for optimizing MO-HTWS problem

  15. ExternE - valuation of hydro power in Klippen. Final report

    International Nuclear Information System (INIS)

    Nilsson, Maans

    1998-08-01

    ExternE is a pan E uropean project aimed at identifying and quantifying external effects from different energy production technologies around Europe. The Swedish implementation carried out case studies on a biomass plant, a coal plant and a hydro power plant. The conventional approach within the ExternE project is to estimate impacts for each priority pathway associated with the fuel cycle, and then economic methods to obtain estimates for the economic damage of each particular impact pathway. However, in the case of hydro power, it is generally not possible to estimate the most important impacts quantitatively. Therefore, a contingent valuation (CV) study was initiated. In a typical CV-study, a selection of individuals are asked to state their willingness to pay for a certain environmental improvement or to avoid an environmental damage. Welfare economic theory suggests that the well-being effects on people from a change from one situation to another can be measured as their willingness to pay or to accept an economic transaction for this change. Environmental services, such as those provided by a river system, are public services and have generally no market price, but the analyst can use people's stated preferences to determine the correct prices of environmental goods and services. The CV study was initiated to obtain an externality value for Klippens Kraftstation. The performed study was of Ex Ante type, which means estimating the values before the exploitation. For this purpose, a site similar to Klippen but without exploitation, was selected: Vojmaan. Three groups of respondents; the local population, the tourists, and the average Swede, were asked to state their perspective on hydro power development their WTP for preserving Vojmaan in its current condition. The results indicate that Locals and Tourists differ significantly from Swedes. The average willingness to pay is calculated from the respondents who absolutely will pay, and those who maybe pay. The

  16. Optimal operation of a pumped-storage hydro plant that compensates the imbalances of a wind power producer

    OpenAIRE

    Duque, Álvaro Jaramillo; Castronuovo, Edgardo D.; Sánchez, Ismael; Usaola, Julio

    2011-01-01

    The participation of wind energy in electricity markets requires providing a forecast for future energy production of a wind generator, whose value will be its scheduled energy. Deviations from this schedule because of prediction errors could imply the payment of imbalance costs. In order to decrease these costs, a joint operation between a wind farm and a hydro-pump plant is proposed; the hydro-pump plant changes its production to compensate wind power prediction errors. In order to optimize...

  17. Rural electrification in Indonesia : the role of micro hydro power in shaping forest conservation behavior

    NARCIS (Netherlands)

    I Wayan Gede Santika, W.; Midden, C.J.H.; Lemmens, A.M.C.

    2009-01-01

    It is reported that villagers at the villages electrified by micro hydro power (MHP) show more favorable attitudes, intentions, and behaviors toward forest conservation. They initiated a community-based agreement regulating forest cutting, reduced trees chopped from the forests, reduced intention

  18. Distributionally robust hydro-thermal-wind economic dispatch

    International Nuclear Information System (INIS)

    Chen, Yue; Wei, Wei; Liu, Feng; Mei, Shengwei

    2016-01-01

    Highlights: • A two-stage distributionally robust hydro-thermal-wind model is proposed. • A semi-definite programing equivalent and its algorithm are developed. • Cases that demonstrate the effectiveness of the proposed model are included. - Abstract: With the penetration of wind energy increasing, uncertainty has become a major challenge in power system dispatch. Hydro power can change rapidly and is regarded as one promising complementary energy resource to mitigate wind power fluctuation. Joint scheduling of hydro, thermal, and wind energy is attracting more and more attention nowadays. This paper proposes a distributionally robust hydro-thermal-wind economic dispatch (DR-HTW-ED) method to enhance the flexibility and reliability of power system operation. In contrast to the traditional stochastic optimization (SO) and adjustable robust optimization (ARO) method, distributionally robust optimization (DRO) method describes the uncertain wind power output by all possible probability distribution functions (PDFs) with the same mean and variance recovered from the forecast data, and optimizes the expected operation cost in the worst distribution. Traditional DRO optimized the random parameter in entire space, which is sometimes contradict to the actual situation. In this paper, we restrict the wind power uncertainty in a bounded set, and derive an equivalent semi-definite programming (SDP) for the DR-HTW-ED using S-lemma. A delayed constraint generation algorithm is suggested to solve it in a tractable manner. The proposed DR-HTW-ED is compared with the existing ARO based hydro-thermal-wind economic dispatch (AR-HTW-ED). Their respective features are shown from the perspective of computational efficiency and conservativeness of dispatch strategies.

  19. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  20. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  1. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  2. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    OpenAIRE

    Febijanto, Irhan

    2013-01-01

    Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from ...

  3. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  4. The effectiveness of new austrian tunnelling method (NATM for hydro power plant construction: lau gunung power plant, north sumatera, indonesia

    Directory of Open Access Journals (Sweden)

    Ade Khoir Rizki

    2017-01-01

    Full Text Available Hydro Electric Power Plant is a power generating system using gravity fall of water as the main force to move the turbine and generate electricity. The construction purpose of Lau Gunung hydropower (2×7. 5 MW that is located in Dairi, North Sumatra, is to Supply power to 14,000 house of the surrounding region. The river run-off system, where the water is immediately contained and then flowed through a tunnel considering the discharge flowing river, where it is constant and does not occur in the fluctuating water level. The Lau Gunung river has the minimum flow that can exceed from 15 to 25 m3/s with a high tunnel dimensions of 4 metres long, 3,9 metres wide and a length of 1,6 kilometres. In terms of the analysis of the time effectiveness of the NATM can be saved because of the continuous work of 24 hours, without any obstacles in which the sub methods used include the drilling & blasting. The tunnel then use the form of steel reinforcement rib and Safety shotcrete lining. The general review may show that using NATM result a tremendous savings, also the use of horse shape conduce small displacement which is effective for the construction.

  5. A Comparison of Prediction Methods for Design of Pump as Turbine for Small Hydro Plant: Implemented Plant

    Science.gov (United States)

    Naeimi, Hossein; Nayebi Shahabi, Mina; Mohammadi, Sohrab

    2017-08-01

    In developing countries, small and micro hydropower plants are very effective source for electricity generation with energy pay-back time (EPBT) less than other conventional electricity generation systems. Using pump as turbine (PAT) is an attractive, significant and cost-effective alternative. Pump manufacturers do not normally provide the characteristic curves of their pumps working as turbines. Therefore, choosing an appropriate Pump to work as a turbine is essential in implementing the small-hydro plants. In this paper, in order to find the best fitting method to choose a PAT, the results of a small-hydro plant implemented on the by-pass of a Pressure Reducing Valve (PRV) in Urmia city in Iran are presented. Some of the prediction methods of Best Efficiency Point of PATs are derived. Then, the results of implemented project have been compared to the prediction methods results and the deviation of from measured data were considered and discussed and the best method that predicts the specifications of PAT more accurately determined. Finally, the energy pay-back time for the plant is calculated.

  6. Neuro-Fuzzy Computational Technique to Control Load Frequency in Hydro-Thermal Interconnected Power System

    Science.gov (United States)

    Prakash, S.; Sinha, S. K.

    2015-09-01

    In this research work, two areas hydro-thermal power system connected through tie-lines is considered. The perturbation of frequencies at the areas and resulting tie line power flows arise due to unpredictable load variations that cause mismatch between the generated and demanded powers. Due to rising and falling power demand, the real and reactive power balance is harmed; hence frequency and voltage get deviated from nominal value. This necessitates designing of an accurate and fast controller to maintain the system parameters at nominal value. The main purpose of system generation control is to balance the system generation against the load and losses so that the desired frequency and power interchange between neighboring systems are maintained. The intelligent controllers like fuzzy logic, artificial neural network (ANN) and hybrid fuzzy neural network approaches are used for automatic generation control for the two area interconnected power systems. Area 1 consists of thermal reheat power plant whereas area 2 consists of hydro power plant with electric governor. Performance evaluation is carried out by using intelligent (ANFIS, ANN and fuzzy) control and conventional PI and PID control approaches. To enhance the performance of controller sliding surface i.e. variable structure control is included. The model of interconnected power system has been developed with all five types of said controllers and simulated using MATLAB/SIMULINK package. The performance of the intelligent controllers has been compared with the conventional PI and PID controllers for the interconnected power system. A comparison of ANFIS, ANN, Fuzzy and PI, PID based approaches shows the superiority of proposed ANFIS over ANN, fuzzy and PI, PID. Thus the hybrid fuzzy neural network controller has better dynamic response i.e., quick in operation, reduced error magnitude and minimized frequency transients.

  7. Municipal water powers small hydro in California

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, C.W.

    1985-07-01

    The city council of San Luis Obispo, California approved a scheme in 1984 to install a hydropower plant into an existing water distribution network. The Stenner Canyon project is under construction on the site of an abandoned water treatment plant. A 750 kW Pelton turbine will be fed via a 20 km pipeline from the Salimas Reservoir. A remote telemetry system will control turbine output. The primary objectives are to generate extra power for the area and provide additional revenue for the city. Computer simulation helped hydraulics engineers design the system. Tax-exempt industrial development bonds will finance the $1.5 million project. 2 figures.

  8. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  9. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    International Nuclear Information System (INIS)

    Bregar, Zvonko

    2007-01-01

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  10. Short-term optimization of the new Avce pumping plant and three existing hydro power plants on the Soca river in Slovenia

    Energy Technology Data Exchange (ETDEWEB)

    Bregar, Zvonko [Milan Vidmar Electric Power Research Institute, Hajdrihova 2, SI-1000 Ljubljana (Slovenia)

    2007-08-15

    In the following years a new pumping plant Avce is going to join the existing cascade of three small-regulating-basin hydro power plants (HPPs) on the Soca river in Slovenia. The pumping plant operation will have to be synchronous to the operation of existing plants and vice versa since all four plants depend upon the same inflow and since they all belong to the same generation company that buys and sells electricity to a day-ahead electricity market. The Soca river has torrent alpine characteristics so there are doubts about the operation of the system in frequent dry seasons. As shown in this article, such questions can be effectively solved by first presenting the hydro system of four HPPs under study as a directed graph and then as a mixed integer linear program (MILP): a set of equations and inequations modeling technical issues of HPPs and a target function (the day-ahead market price) modeling the electricity market. A small and simple MILP model called Flores has been used for this study. The MILP approach requires only to specify the problem since the solution is found by using available commercial computer solvers. It can be applied on-line and it can be augmented to include also the transmission constraints, ancillary services, etc. (author)

  11. The potential for small-scale hydro power in Romania: a call for more co-ordinated governance

    Energy Technology Data Exchange (ETDEWEB)

    Luta, Alexandru

    2011-07-01

    Romania offers significant untapped resources for the development of small-scale hydro (SSH). The technology has been deployed before and is preserved. Projected increases in the demand for electricity coupled with the expected decommissioning of inefficient thermal capacity means that plenty of scope exists for adding capacity in Romania. It is questionable though whether the present lavish treatment of renewables is sustainable. The excessive burden placed on consumers given the likely policy overshoot raises questions about the sustainability of the Green Certificate scheme under the present form. Real hurdles about SSH projects persist in identifying sites, acquiring land and obtaining permits. The key hindrances to a more thorough expansion of SSH in Romania have to do with decision-making transparency, policy predictability and information diffusion. The erratic nature of Romanian renewables policy is directly connected to slow pace of the Romanian authorities in learning how to coordinate policy implementation between the local, central and European level in an effective manner. But given that that no fundamental regulatory transformation occur over the next year or two and that in that interval the issuance of permits and the acquisition of property is standardized, SSH may yet prove a fruitful line of business in Romania.(auth)

  12. The power of commitment : Newfoundland and Labrador Hydro 2000 annual report

    International Nuclear Information System (INIS)

    2000-01-01

    A consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) was presented with particular focus on energy production, energy sales, the Avalon Transmission upgrade, development of the Granite Canal and Hydro's dam safety program. Hydro reported a 4.5 per cent increase in gross energy production at their generating plants throughout the system. Production from hydro sources also increased by 4.5 per cent to a total of 5,032 GWh. Thermal production from the Holyrood generating facility also increased slightly to 1,040 GWh. Production for peaking and emergency requirements from gas turbines and diesel plants dropped to 0.6 GWh. In 2000, about 83 per cent of all the energy supplied to their customers came from hydro sources. Total energy sales were up 4.6 per cent during 2000. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  13. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Duran, Felicia Angelica [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.; Waymire, Russell L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Security Systems Analysis Dept.

    2013-10-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  14. Computer Security for Commercial Nuclear Power Plants - Literature Review for Korea Hydro Nuclear Power Central Research Institute

    International Nuclear Information System (INIS)

    Duran, Felicia Angelica; Waymire, Russell L.

    2013-01-01

    Sandia National Laboratories (SNL) is providing training and consultation activities on security planning and design for the Korea Hydro and Nuclear Power Central Research Institute (KHNPCRI). As part of this effort, SNL performed a literature review on computer security requirements, guidance and best practices that are applicable to an advanced nuclear power plant. This report documents the review of reports generated by SNL and other organizations [U.S. Nuclear Regulatory Commission, Nuclear Energy Institute, and International Atomic Energy Agency] related to protection of information technology resources, primarily digital controls and computer resources and their data networks. Copies of the key documents have also been provided to KHNP-CRI.

  15. Small HydroPower (SHP) development in Nigeria: Issues ...

    African Journals Online (AJOL)

    Nigeria as of today generates less than 4000MW of electricity but has the capability of increasing her generation through small hydropower (SHP) considering unharnessed potentials in the country. In other to increase the percentage contribution of hydroelectricity to the total energy mix and to extend electricity to rural and ...

  16. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  17. (Hydro-Quebec) Illustrated vocabulary representing power line transmission and distribution of electric power. 4, maintenance. (Hydro-Quebec) Vocabulaire illustre des lignes aeriennes de transport et de distribution d'electricite. Fascicule 4, entretien

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    This dictionary is intended to help standardize the terminology used among Hydro-Quebec personnel involved with power lines. This volume is concerned with words applicable to power line maintenance, and is arranged in six parts: poles and link sticks, adapters and related tools, safety devices, safety clothing and climbing equipment, measurement and control devices, and techniques. Virtually all of the terms are illustrated. English language equivalents are given, but these are not standardized terms and are included for informative purposes only. English and French indexes are included. 184 refs., 256 figs.

  18. Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices

    DEFF Research Database (Denmark)

    Hosseini, S.M.H.; Forouzbakhsh, Farshid; Fotouh-Firuzabad, Mahmood

    2008-01-01

    One of the most important issues in planning the ‘‘reservoir” type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation...

  19. Financial reporting for the Powersmart programs of British Columbia Hydro and Power Authority

    International Nuclear Information System (INIS)

    Morris, A.T.

    1990-01-01

    The Powersmart program at British Columbia Hydro seeks to minimize the short- and long-term energy costs to customers through the efficient or avoided use of electricity. In determining the overall financial reporting of Powersmart, four areas were reviewed in depth. The question of deferral or expensing of expenditures was examined with reference to accounting principles and industry practice in Canada and the USA. Discussion is provided on the costs that would be deferred, the amortization period of deferred expenses, and financial statement presentation. Deferral and amortization appear appropriate if the costs incurred are recoverable under future rates. The design, development, and implementation of power saving programs are outlined as well as the criteria for selection of an amortization period. At British Columbia Hydro, all Powersmart programs are treated as one type of expense and an amortization period of 7 years has been selected for all programs to simplify the accounting

  20. Retrofitting of the small hydro electric scheme 'Moulin de Bavois' - Feasibility study; Rehabilitation du Moulin de Bavois. Etude d'avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) is a feasibility study of the retrofitting of the small hydro electric scheme 'Moulin de Bavois' located in Bavois on the Talent river, Switzerland. The existing scheme uses a 12 m water fall and its power amounts to about 10 kW. After retrofitting, based on a future new water-use concession, the maximum electric power produced should be 172 kW, generating 531 MWh/y, 65% of which in the wintertime. New weir and penstock are foreseen as is an axial Kaplan turbine and a reliable water cleaning device. The Talent river flows in the woods. Electricity production cost is estimated to be 0.214 CHF/kWh.

  1. Analysis of a pico tubular-type hydro turbine performance by runner blade shape using CFD

    Science.gov (United States)

    Park, J. H.; Lee, N. J.; Wata, J. V.; Hwang, Y. C.; Kim, Y. T.; Lee, Y. H.

    2012-11-01

    There has been a considerable interest recently in the topic of renewable energy. This is primarily due to concerns about environmental impacts of fossil fuels. Moreover, fluctuating and rising oil prices, increase in demand, supply uncertainties and other factors have led to increased calls for alternative energy sources. Small hydropower, among other renewable energy sources, has been evaluated to have adequate development value because it is a clean, renewable and abundant energy resource. In addition, small hydropower has the advantage of low cost development by using rivers, agricultural reservoirs, sewage treatment plants, waterworks and water resources. The main concept of the tubular-type hydro turbine is based on the difference in water pressure levels in pipe lines, where the energy which was initially wasted by using a reducing valve at the pipeline of waterworks, is collected by turbine in the hydro power generator. In this study, in order to acquire the performance data of a pico tubular-type hydro turbine, the output power, head and efficiency characteristics by different runner blade shapes are examined. The pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  2. Optimal hydro scheduling and offering strategies considering price uncertainty and risk management

    International Nuclear Information System (INIS)

    Catalão, J.P.S.; Pousinho, H.M.I.; Contreras, J.

    2012-01-01

    Hydro energy represents a priority in the energy policy of Portugal, with the aim of decreasing the dependence on fossil fuels. In this context, optimal hydro scheduling acquires added significance in moving towards a sustainable environment. A mixed-integer nonlinear programming approach is considered to enable optimal hydro scheduling for the short-term time horizon, including the effect of head on power production, start-up costs related to the units, multiple regions of operation, and constraints on discharge variation. As new contributions to the field, market uncertainty is introduced in the model via price scenarios and risk management is included using Conditional Value-at-Risk to limit profit volatility. Moreover, plant scheduling and pool offering by the hydro power producer are simultaneously considered to solve a realistic cascaded hydro system. -- Highlights: ► A mixed-integer nonlinear programming approach is considered for optimal hydro scheduling. ► Market uncertainty is introduced in the model via price scenarios. ► Risk management is included using conditional value-at-risk. ► Plant scheduling and pool offering by the hydro power producer are simultaneously considered. ► A realistic cascaded hydro system is solved.

  3. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs

  4. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-06-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs.

  5. Performance of a direct drive hydro turbine for wave power generation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Y-H; Kim, C-G [Division of Mechanical and Information Engineering, Korea Maritime University Dongsam-dong 1, Youngdo-ku, Busan, 606-791 (Korea, Republic of); Choi, Y-D; Kim, I-S [Department of Mechanical Engineering, Mokpo National University Muan-ro 560, Chunggye-myun, Jeonnam, 534-729 (Korea, Republic of); Hwang, Y-C, E-mail: lyh@hhu.ac.k [R and D Institute, Shinhan Precision Co. Ltd. Gomo-ri 313, Jinle-myun, Kimhae, 621-881 (Korea, Republic of)

    2010-08-15

    Clean and renewable energy technologies using ocean energy give us non-polluting alternatives to fossil-fueled power plants as a countermeasure against the global warming and growing demand for electrical energy. Among the ocean energy resources, wave power takes a growing interest because of its enormous amount of potential energy in the world. Therefore, various types of wave power system to capture the energy of ocean waves have been developed. However, suitable turbine type is not normalized yet because of relatively low efficiency of the turbine systems. The purpose of this study is to investigate the performance of a newly developed direct drive hydro turbine (DDT), which will be built in a caisson for wave power plant. Experiment and CFD analysis are conducted to clarify the turbine performance and internal flow characteristics. The results show that the DDT obtains fairly good turbine efficiency in both cases of with wave and no wave conditions. As the turbine performance is influenced considerably by the wave condition, designed point of the turbine should be determined according to the wave condition at an expected installation site. Most of the output power generates at the runner passage of the Stage 2.

  6. Integrity and life estimation of turbine runner cover in a hydro power plant

    Directory of Open Access Journals (Sweden)

    A. Sedmak

    2016-03-01

    Full Text Available This paper presents integrity and life estimation of turbine runner cover in a vertical pipe turbines, Kaplan 200 MW nominal output power, produced in Russia, and built in six hydro-generation units of hydroelectric power plant „Đerdap 1” in Serbia. Fatigue and corrosion-fatigue interaction have been taken into account using experimentally obtained material properties, as well as analytical and numerical calculations of stress state, to estimate appropriate safety factors. Fatigue crack growth rate, da/dN, was also calculated, indicated that internal defects of circular or elliptical shape, found out by ultrasonic testing, do not affect reliable operation of runner cover.

  7. Penstock failure detection system at the 'Valsan' hydro power plant

    International Nuclear Information System (INIS)

    Georgescu, A M; Coşoiu, C I; Alboiu, N; Hlevca, D; Tataroiu, R; Popescu, O

    2012-01-01

    'Valsan' is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small 'Valsan' river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. 'Hidroelectrica', the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the 'Valsan' HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of 'Hidroelectrica' a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  8. Penstock failure detection system at the "Valsan" hydro power plant

    Science.gov (United States)

    Georgescu, A. M.; Coşoiu, C. I.; Alboiu, N.; Hlevca, D.; Tataroiu, R.; Popescu, O.

    2012-11-01

    "Valsan" is a small Hydro Power Plant, 5 MW, situated at about 160 km north of Bucharest, Romania, on the small "Valsan" river in a remote mountainous area. It is equipped with a single Francis turbine. The penstock is located in the access shaft of the HPP. "Hidroelectrica", the Romanian company that operates the HPP, was trying to implement a remote penstock failure detection system. Starting from a classic hydraulic problem, the authors of the paper derived a method for failure detection and localization on the pipe. The method assumes the existence of 2 flow meters and 2 pressure transducers at the inlet and outlet of the pressurized pipe. Calculations have to be based on experimental values measured in a permanent regime for different values of the flow rate. The method was at first tested on a pipe, in the Hydraulic Laboratory of the Technical University of Civil Engineering Bucharest. Pipe failure was modelled by opening of a valve on a tee branch of the analyzed pipe. Experimental results were found to be in good agreement with theoretical ones. The penstock of the "Valsan" HPP, was modelled in EPANET, in order to: i) test the method at a larger scale; ii) get the right flow and pressure transducers that are needed to implement it. At the request of "Hidroelectrica" a routine that computes the efficiency of the turbine was added to the monitoring software. After the system was implemented, another series of measurements were performed at the site in order to validate it. Failure was modelled by opening an existing valve on a branch of the penstock. Detection of the failure was correct and almost instantaneous, while failure location was accurate within 5% of the total penstock length.

  9. Canadian hydro potential in the North American market

    International Nuclear Information System (INIS)

    Adams, K.

    2002-01-01

    Canada's hydro potential in the North American energy market was discussed. Canada is a net exporter of electricity in North America, and since 1990, has exported an average of 28 Terawatt hours/year to the United States. More than 65 per cent of these exports were generated from hydro power plants. It was emphasized that significant reductions in greenhouse gases can be achieved if Canadian hydroelectricity is substituted for coal power generation. It was also noted that although there may not be enough hydro capacity to meet all of North America's energy requirements, development of new large hydro resources in Canada could help meet the growing demand for electricity in the United States. Hydro can also complement other renewable energy sources such as wind and solar. The factors that will determine if Canadian hydropower will contribute to the energy demand are market mechanisms such as greenhouse gas credit trading systems which provide incentive for renewable energy projects. In addition, the existing infrastructure must be expanded both east and west within Canada and north and south between Canada and the United States. 5 figs

  10. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  11. Natural resources: adjusting and innovating - Hydro-Quebec in the global age

    International Nuclear Information System (INIS)

    Ouellet, D.

    1995-01-01

    Although it is believed that the information economy is replacing the mass economy, many companies continue to grow on economies based on natural resources. Recent aggressive growth by Hydro-Quebec in the highly competitive market for energy products was singled out as one of the success stories. Among other things, Hydro-Quebec was reported to focus attention on the globalization of electricity products, particularly in Asia, Europe and Africa. The corporation was said to cooperate with other utilities companies such as Ontario Hydro and Power Asia Assets Corporation to diversify its markets abroad. Hydro-Quebec is also marketing new products, developed in its laboratories and by subsidiaries, such as power system simulators and power system planning and management systems, on a global scale

  12. Real-time versus day-ahead market power in a hydro-based electricity market

    OpenAIRE

    Tangerås, Thomas P.; Mauritzen, Johannes

    2014-01-01

    We analyse in a theoretical framework the link between real-time and day-ahead market performance in a hydro-based and imperfectly competitive wholesale electricity market. Theoretical predictions of the model are tested on data from the Nordic power exchange, Nord Pool Spot (NPS).We reject the hypothesis that prices at NPS were at their competitive levels throughout the period under examination. The empirical approach uses equilibrium prices and quantities and does not rely on bid data nor o...

  13. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  14. Modelling of hydro and wind power in the regulation market

    International Nuclear Information System (INIS)

    Kiviluoma, J.; Holttinen, H.; Meibom, P.

    2006-01-01

    The amount of required regulation capacity in the power system is affected by the wind power prediction errors. A model has been developed which can evaluate the monetary effects of prediction errors. The model can be used to evaluate (1) the regulation costs of wind power, (2) regulation market prices including effects related to the participation of power producers in the regulating power market, (3) value of accurate wind forecasts and (4) the effect of decreasing the length of the spot market clearance. This article discusses the problems related to developing a realistic model of the regulating power market including the interaction between the spot market and the regulating power market. There are several issues that make things complicated. (1) How to calculate the minimum amount of needed secondary (minute) reserves. Traditionally the Nordic TSOs have used an N-1 criteria in each country to determine the required amounts of positive secondary reserve, but as installed wind power capacity grows, it will become relevant to include the wind power prediction errors in the estimation of secondary reserves. (2) Consumption forecast errors and plant outages also contribute to activation of regulating power and should have stochastic input series besides wind power. (3) Risk premiums and transaction costs in the regulating power market are difficult to estimate as well as the effects of the possible use of market power. This is especially true in the Nordic system with the high share of hydro power, since the water value and hydrological limitations make things more complex than in a thermal system. (4) The available regulation capacity is not necessarily equal to the truly available capacity. All producers don't participate in the regulation market although in principle they could. (orig.)

  15. Small scale hydraulic power. Hydraulics: the wheel spins. Power producers: times are getting better; MWh are negotiating with fishes; Inspection: game of drones; Moulin de Courteron: a true environment-friendly renovation

    International Nuclear Information System (INIS)

    Piro, Patrick; Bongrain, Timothee

    2017-01-01

    This document addresses the evolution of small-scale hydraulic power in France. It contains 5 articles which concern the small-scale hydro-electric power sector which is gaining confidence, thanks to new regulations (notably about financial incentives and 'call for tender' procedures) and new technologies such as smart drones for site inspection. However, the sector is increasingly faced with environmental issues and oppositions. Presentation of the 'Moulin de Courteron' project, an ancient water mill that has been renovated (installation of 3 x 45 kW turbines) in an exemplary way from the environmental and social points of view (the project has been crowd-funded)

  16. Potency of Micro Hydro Power Plant Development Use of Kelampuak River Flow Located in Tamblang Village – Buleleng

    Directory of Open Access Journals (Sweden)

    Dewa Ngakan Ketut Putra Negara

    2012-11-01

    Full Text Available Need of electrical energy is increasing along with people population and economic growth. According to PLN data, Bali Province’s electrical consumption is predicted growth 5,6% in average every year. Until year 2007, electrical condition in Bali is categorized critical. If Power Plat in Bali, PLTG Gilimanuk that has power 130 MW is out of system, affecting Bali’s electrical back up is minus. Consecuenlly, it will be extinguishing if there is not adding power plan or new energy supply. This problem needs to be anticipated by use of thermal energy program such as coal, gas and geothermal and use of alternative energy such as solar, wind and ocean energies. Regency of Buleleng is one of Regency in Bali having potency of renewable energy development especially water resource. It has some rivers that have potency to be developed as a Micro Hydro Power Plant (PLTMH. One of them is Kelampuak River which is located in Tamblang Village. As a first step in developing of Micro Hydro Power Plant, it needs to be known water debit and head of the river. For that reason, it needs to be investigated debit and head of Kelampuak River so that it can be predicted the power can be generated.

  17. Navigating the hydro market in Latin America

    International Nuclear Information System (INIS)

    Yermoli, C.A.

    1995-01-01

    The governments of most Latin American countries have yet to establish clear policies about the future ownership of existing generation assets, but they do expect future capacity to be largely developed by the private sector. There were at one time plans for many government-financed hydro projects in the area, but these projects produced much paper and little electricity. Present trends will take the area toward independent power projects, both hydro projects and thermal power projects. This article is a review of those present trends

  18. Power generation by high head water in a building using micro hydro turbine-a greener approach.

    Science.gov (United States)

    M M S R S, Bhargav; V, Ratna Kishore; S P, Anbuudayasankar; K, Balaji

    2016-05-01

    Demand for green energy production is arising all over the world. A lot of emphasis is laid in making the buildings green. Even a small amount of energy savings made contribute to saving the environment. In this study, an idea is proposed and studied to extract power from the high head water in the pipelines of a building. A building of height 15 m is considered for this study. Water flowing in the pipe has sufficient energy to run a micro hydro turbine. The feasibility of producing electrical energy from the energy of pipe water is found. The motivation is to find the feasibility of generating power using a low-cost turbine. The experimental setup consists of micro turbine of 135 mm diameter coupled to a 12-V DC generator; LEDs and resistors are employed to validate the results. The theoretical calculations were presented using the fundamental equations of fluid mechanics. The theoretical results are validated using experimental and numerical results using CFD simulation. In addition, exergy analysis has been carried out to quantify the irreversibilities during the process in the system.

  19. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  20. Gas power production, surplus concepts and the transformation of hydro-electric rent into resource rent

    International Nuclear Information System (INIS)

    Amundsen, Eirik S.

    1997-01-01

    The paper considers the effects of introducing large scale gas power production capacity into an electricity sector based on hydropower. In this process the economic rent is transmitted from the hydro power sector to the resource rent in the gas power sector, but is along the way intermingled with ordinary producer surplus and quasi-rent stemming from increasing cost conditions in the production infrastructure and capacity constraints. The net effect on total rent generated depends on development in demand, demand elasticities, costs saved from delaying hydropower projects and the existence of producer surplus in gas power generation. The paper closes with a discussion of possible tax base changes following from the introduction of a thermal power system based on natural gas

  1. From centralized hydro-thermal to decentralized renewable : the Austrian challenge

    International Nuclear Information System (INIS)

    Brauner, G.

    2007-01-01

    Austria's electricity production scheme is currently based on 67 per cent hydro power, 25 per cent fossil thermal power and 8 per cent new renewable energy, including wind, biomass, and photovoltaic conversion. As demand on centralized energy systems increases, the power generation, transmission and distribution system in the country will have to be restructured to increase the portion of regenerative generation. Decentralized micro-grid structures are a promising concept for meeting the target of efficiency improvement and renewable generation because they make it possible to use regenerative energy where it is collected. The most efficient way to meet the challenges of efficiency improvement and emission reduction is the replacement of old coal-fired power stations by new combined-cycle gas power stations with combined heat and power. This will reduce both carbon dioxide emissions as well as specific fossil energy demand. However, in just 1 decade the emission reduction achieved by fuel switching and higher efficiency of power stations will be equalized by higher demand, which is growing at an annual rate of 2 per cent. Future energy problems will be characterized by the security of supply; climatic change and the need for clean energy technologies; the lack of transmission-routes; and growing energy demand. The regenerative energy in Austria currently consists of hydraulic large run-of-river hydraulic generation as well as small scale hydro and large scale hydro storage systems. Biomass currently has a total generating capacity of 280 MW and forms 3.14 per cent of generation in Austria. Wind has reached a capacity of 950 MW and forms 3.8 per cent of generation in Austria. It was concluded that the future philosophy in energy supply will not be to try to increase regenerative generation according to growing demand, but to improve end-use efficiency and reduce demand according to the renewable regional potential. 4 refs., 4 figs

  2. Pico hydro turbines for electricity in rural areas

    OpenAIRE

    Descotte, Gérard

    2016-01-01

    This article discusses the feedback and lessons learned, particularly from a survey carried out following the deployment program of a pico hydro power solution in a very isolated rural area in north Laos. This project is part of the strategic development for the rural electrification of Laos, in which pico hydro power facilities constitute the main avenue of progress for the electrification of isolated villages.

  3. Possibilities for Wind- and Small Hydro Power in China

    NARCIS (Netherlands)

    Faber, Tom

    2008-01-01

    Due to a fast growing economy and population, China’s electricity requirement vastly increases. To reduce social and environmental impact, a shift from mainly coal fired power generation towards renewable electricity options is a possible solution. The re

  4. Enmax to buy more green power

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    Enmax, Calgary's electric power utility has recently issued a request for proposals to wind and small hydro power producers to supply an additional 30,000 MWh of green energy before the end of this year, and 40,000 MWh per year for the next 10 years. To meet this new demand with wind power, it would be necessary to install an additional 12 MW of new wind capacity. To qualify, a producer must be Ecologo certifiable have facilities built after 1996. The new energy will be used to expand green energy into the commercial energy market, as well as to sign up more residential customers. (Currently there are about 1,000.) Epcor, the Edmonton electric utility currently has 1,700 green energy customers and hopes to have 7,000 by 2005. Currently, it markets green energy generated by Whitecourt Power's wood waste biomass plant, but hopes to augment its supply from small hydro production from an Alberta plant now being installed in a joint venture with Canadian Hydro Developers. Epcor also has a 13.4 kW solar array installed on the roof of its headquarters building which has been recently EcoLogo certified

  5. Hydro-Quebec 2005 annual report : people with energy

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec generates, transmits and distributes electricity mainly produced by renewable energy sources. Its sole shareholder is the Quebec government. This annual report reviewed the operations of Hydro-Quebec, and provided data on energy sales, production and details of the utility's environmental programs. Information on Hydro-Quebec subsidiaries in 2005 was presented in the following separate sections: Hydro-Quebec Production; Hydro-Quebec TransEnergie; Hydro-Quebec Distribution; Hydro-Quebec Equipement; and the Societe d'energie de la Baie James. In 2005, Hydro-Quebec Distribution signed contracts for an initial block of 990 MW of wind power and issued a tender call for an additional 2000 MW of wind power. A generator balancing service was created and authorized by the Regie de l'energie. Hydro-Quebec customers have achieved energy savings of nearly 450 GWh in 2005. The commissioning of Toulnustouc generating station was achieved 5 months ahead of schedule. The 526 MW facility will generate 2.7 TWh annually. Work at the Chute-Allard and Rapide-des-Coeurs sites has continued, as well as construction at Mercier and Peribonka and Eastmain-1. Income from continuing operations came to $2.25 billion, a $124 million increase that was attributed to a rise in domestic sales and net short-term exports. The income was offset by higher pension expenses, depreciation and amortization, as well as by cost of supply on external markets and financial expenses. All other operating expenses were lower than in 2004. Capital spending for the transmission system reached its highest level since 1997, with $793 million invested, including $336 million to meet growth. Data on the company's financial performance, executive changes and reorganization were provided. Financial statements included a review and analysis of financial transactions, an auditor's report, as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and

  6. The Environmental Impact Study Of Micro Hydro Power In Pekalongan Indonesia

    Science.gov (United States)

    Suwarto; Hadi, Sudharto P.; Hermawan

    2018-02-01

    Curugmuncar II micro hydro power (MHP) located in Petungkriyono sub district is one of three MHPs installed in Pekalongan district. This study aims to analyze the MHP operation environmental impact. The study used qualitative method, with interviews, observations, and material testing. The data used are primary and secondary data. This research was conducted in Curugmuncar Village, Petungkriyono Subdistrict, Pekalongan Regency, Indonesia. MHP has power capacity of 100 KW with power usage of 50 KW. MHP used by 155 users with load capacity 2 A 220 volt AC. The community more used of lights as the houses and street lighting. The MHP operation had several environmental factors such as: sociology, technically feasible, hydrology, physical and chemical water quality, ergonomics, economically feasible, irrigation, clean water supply, government policy, and others. The supporting factors sustainability of MHP were sociology, irrigation, ergonomics, clean water supply, physical and chemical water quality, hydrology, and government policy. The inhibiting factors of MHP operation were technically feasible, economically feasible, and government policy. The results showed that the MHP environment requires a professional management system to achieve the MHP sustainability

  7. Detailed feasibility study of a small-hydro power plant in Zerni on the municipal drinking water supply; Etude detaillee de faisabilite pour l'installation d'une petite centrale sur l'adduction d'eau potable de Zerni - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Reul, B. [MHyLab, Montcherand (Switzerland); Perruchoud, A. [SierreEnergie SA, Sierre (Switzerland)

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the municipal drinking water supply of the city of Sierre, Switzerland. The installation is to be made at the site of a new reservoir in Zerni. The report presents details on the hydrological data and the dimensioning of the installation. The hydrological installations and the turbine foreseen are described and discussed, as are the applicable water regulations. The electricity production expected is discussed, as is the economic viability of the project.

  8. Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' hydroelectric system into the power system of the Republic of Macedonia

    International Nuclear Information System (INIS)

    Rumenova, Evica; Naumoski, Kliment

    2001-01-01

    At the and of 1998, a study on conditions and possibilities of the 'Shara' hydroelectric system construction was prepared. The study considers an interesting idea for building up three reversible power plants. From electricity point of view the study emphasizes several significant issues that require comprehensive analyses in order to define the conditions and possibilities for their development. This paper attempts to give an overview of one of this issues: Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' - system into the power supply system of Republic of Macedonia. (Original)

  9. More than energy: Ontario Hydro final annual report, January 1998 - March 1999

    International Nuclear Information System (INIS)

    1999-01-01

    Ontario Hydro ceased operations on March 31, 1999 and its assets and functions were transferred by provincial statute to two successor corporations: Ontario Power Generation Corp. (OPG) and Ontario Hydro Services Inc. Its functions were also transferred to the Independent Electricity Market Operator and the Electrical Safety Authority, two not-for-profit agencies. The original act defining Ontario Hydro was replaced by the Energy Competition Act, 1998. Until the demerger of the company on April 1, 1999, Ontario Hydro served 108 direct industrial clients, almost one million retail clients and 255 municipal utilities. Ontario Power Generation inherited Ontario Hydro's generating portfolio, making it one of the largest power producers in North America in terms of installed capacity. The OPG system includes 69 hydroelectric stations, three nuclear sites, and six operating fossil fueled stations. Total installed system capacity is approximately 31,000 megawatts, and Ontario Hydro's total sales in 1998 were almost 139 terawatt hours. Ontario Hydro Services Company is an energy services-based transmission and distribution company. It owns and maintains 29,000 km of transmission lines, 114,700 km of distribution lines, 245 km of high-voltage underground cable, 256 transformer stations, 928 distribution and regulation stations, and 250 microwave stations. It also retains the retail business held by Ontario Hydro, which serves over 950,000 clients, and the transmission and generating business for 23 remote communities in Northern Ontario

  10. How would the privatization of Hydro-Quebec make Quebecers richer?

    International Nuclear Information System (INIS)

    Garcia, C.

    2009-02-01

    In 1962, a total of 46 companies shared Quebec's electricity production, involving no less than 9,710 megawatts of power. The 4 companies that controlled 85 per cent of this power were Hydro-Quebec, Aluminum Company of Canada (Alcan), Shawinigan Water and Power Company and the Gatineau Power Company. At the time, electricity rates also varied considerably throughout Quebec, being extremely high in regions far from Montreal, which hindered potential industrial development in those areas. This report discussed the privatization of Hydro-Quebec and how it could make Quebecers richer. The report discussed the early days of electricity in Quebec and outlined the reasons that led Quebec to nationalize the production and distribution of electricity and to entrust its management to Hydro-Quebec. A summary of the developments undertaken to enable Hydro-Quebec to substantially boost its exports to the United States following liberalization of the American market toward the end of the twentieth century was also provided. A comparison group of companies in the United States involved in the production, transmission and distribution of electricity was also presented in order to analyze Hydro-Quebec's performance from various standpoints. Other topics that were addressed in the report included operational efficiency; use of capital; the experience of the United Kingdom; the rise in electricity rates; a strategy for privatization; the public offering; and protecting Quebec electricity consumers. The role of the Quebec government and of Hydro-Quebec were also examined. Electricity exports and electricity and aluminum smelters were also assessed. The report noted that Hydro-Quebec's annual profit would shrink from $2,882 million to $709 million if it had to pay the market price for the electricity it obtains from Churchill Falls. 23 tabs., 1 fig., 2 appendices

  11. Potentials for development of hydro-powered water desalination in Jordan

    International Nuclear Information System (INIS)

    Akash, B.A.; Mohsen, M.S.

    1998-01-01

    Due to the increase in population and development in agriculture, Jordan will deplete all of its renewable sources of fresh water in the next few years. On the other hand, the level of the Dead Sea has been falling at a high rate for the past three decades, due to the diversion of water from the Jordan River for irrigation. The solution to these issues could be in finding other alternatives such as the development of hydro-powered water desalination plant. Desalted water would be produced in order to make up for the shortage of fresh water using membrane technology, and thus reserve fresh ground water for future generations. This paper finds, on an annual basis, that about 2133 million cubic meters (MCM) of water can be drawn from the Red Sea. The power generated due to difference in elevation is used to desalinate Red Sea water. About 533 MCM of fresh water is produced in such a process. The brine, which is about 1600 MCM, is discharged into the Dead Sea. (author)

  12. 77 FR 47622 - TransCanada Hydro Northeast Inc.; FirstLight Power Resources; Notice of Environmental Site Review

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1892-000 New Hampshire-Vermont; Project No. 1855-000 New Hampshire-Vermont; Project No. 1904-000 New Hampshire-Vermont; Project No. 2485-000 Massachusetts; Project No. 1889-000 Massachusetts] TransCanada Hydro Northeast Inc.; FirstLight Power Resources; Notice of Environmenta...

  13. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  14. A new PID controller design for automatic generation control of hydro power systems

    Energy Technology Data Exchange (ETDEWEB)

    Khodabakhshian, A.; Hooshmand, R. [Electrical Engineering Department, University of Isfahan (Iran)

    2010-06-15

    This paper presents a new robust PID controller for automatic generation control (AGC) of hydro turbine power systems. The method is mainly based on a maximum peak resonance specification that is graphically supported by the Nichols chart. The open-loop frequency response curve is tangent to a specified ellipse and this makes the method to be efficient for controlling the overshoot, the stability and the dynamics of the system. Comparative results of this new load frequency controller with a conventional PI one and also with another PID controller design tested on a multimachine power system show the improvement in system damping remarkably. The region of acceptable performance of the new PID controller covers a wide range of operating and system conditions. (author)

  15. The Thur weir small hydro scheme in Muellheim; Projekt Thurwehr Muellheim. Programm Kleinwasserkraftwerke - Zwischenbericht

    Energy Technology Data Exchange (ETDEWEB)

    Jaeggi, F. [Isento AG c/o Atel EcoPower, Olten (Switzerland); Herrmann, Ch. [Tobias Rapp, BHAteam Ingenieure AG, Frauenfeld (Switzerland)

    2009-06-15

    This interim report for the Swiss Federal Office of Energy (SFOE) takes a look at a small hydro scheme in Muellheim, Switzerland. An existing weir that provides water for two small hydropower stations is to be augmented with a new installation at the weir. Three possible variants for the project are described and discussed. The topology, geology and hydrology of the location are examined. The project also involves a higher weir and the provision of a fish pass. Special consideration concerning the stability of a railway bridge just above the new weir is noted. The organisation of the building site and the six phases of the works to be carried out are discussed. The installation of two turbines is noted and their proposed energy production is commented on.

  16. Production method of hydrogen jet plasma process in hydro machinery

    International Nuclear Information System (INIS)

    Amini, F.

    2007-01-01

    The purpose of present paper is to the process of plasma formation in hydro machinery when a hydro turbine operates at various conditions and load rejection. By investigation the power, shock pressure , and impact effects of hydro machinery, it is revealed that energy and hydrogen are generated by the plasma process. The investigation on several turbines of various hydro power plants reveals that cold fusion process in hydro machinery generates hydrogen. The hypothesis concerning the participation of alkaline metals in river water and the atomic nuclei of the runner blade material in the formation of hydrogen are considered. It is possible to assume hydrogen, deuterium, helium, and tritium atoms (based on Dr. Mizuno and Dr. Kanarev theories) that are formed, diffuse into cavitation bubbles. The plasma is generated during the collapse of the bubble; thus, the quantity of burnt hydrogen determine the volume of generating hydrogen and the impact force caused by hydrogen explosion (noise).There are five main notions, which can determine hydrogen and plasma process: (1) turbine power effect, (2) high shock pressure, (3) crack on turbine parts, (4) impacts effects and (4) the lift of rotating parts. The frequency of the excitation lies in a range from 0.786 to 1.095 Hz.In future, it may be possible to design hydro turbines based on the plasma process that generates hydrogen; or there may exist turbines that rotate with a mixture of hydrogen explosion and water energies

  17. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  18. The Environmental Impact Study Of Micro Hydro Power In Pekalongan Indonesia

    Directory of Open Access Journals (Sweden)

    Suwarto

    2018-01-01

    Full Text Available Curugmuncar II micro hydro power (MHP located in Petungkriyono sub district is one of three MHPs installed in Pekalongan district. This study aims to analyze the MHP operation environmental impact. The study used qualitative method, with interviews, observations, and material testing. The data used are primary and secondary data. This research was conducted in Curugmuncar Village, Petungkriyono Subdistrict, Pekalongan Regency, Indonesia. MHP has power capacity of 100 KW with power usage of 50 KW. MHP used by 155 users with load capacity 2 A 220 volt AC. The community more used of lights as the houses and street lighting. The MHP operation had several environmental factors such as: sociology, technically feasible, hydrology, physical and chemical water quality, ergonomics, economically feasible, irrigation, clean water supply, government policy, and others. The supporting factors sustainability of MHP were sociology, irrigation, ergonomics, clean water supply, physical and chemical water quality, hydrology, and government policy. The inhibiting factors of MHP operation were technically feasible, economically feasible, and government policy. The results showed that the MHP environment requires a professional management system to achieve the MHP sustainability

  19. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  20. Higher profits, lower bills : a new electricity strategy for Hydro-Quebec

    International Nuclear Information System (INIS)

    2010-01-01

    Quebec is the fourth largest producer of hydro-electricity in the world, and has among the lowest electricity rates in North America. In 2008, 89 percent of the electricity produced by Hydro-Quebec was sold in the province, and the remainder was exported. In 2009, the electric utility released its strategic plan for 2009 to 2013. Hydro-Quebec's net profits are forecast to decline by 24 percent by 2013 and electricity rates are forecast to rise by 8.5 percent. Since Hydro-Quebec has already developed all of the province's low-cost hydroelectric resources, it can no longer increase profits and lower rates by building new hydropower production stations. In order to continue to prosper, the utility will invest in energy efficiency and better coordination of its power system with Ontario's. Increased electricity exports from Hydro-Quebec will help both Ontario and the United States reduce their greenhouse gas emissions by displacing fossil power generation. 25 refs., 2 tabs., 3 figs.

  1. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  2. HydroPak: concept design and analysis of a packaged cross-flow turbine

    International Nuclear Information System (INIS)

    2004-01-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed

  3. A long-term optimization method for reservoir management in a market oriented hydro-dominated power systems

    International Nuclear Information System (INIS)

    Sultovic, E.; Sarajcev, I.; Majstrovic, M.

    2001-01-01

    This paper presents an optimization-based method for the long-term scheduling of hydrothermal power system. The proposed method maximizes the profit of hydroelectric production in power system based on monthly energy requirement of the system and unit commitment calculations. The method allows precise hydro chain modeling with numerous restrictions as well as computation for multiple-reservoir river systems with multiple-purpose operation. The method has been implemented in a computer program and tested on power system, which is very similar to Croatian Power System in the year 2000. Several testing results are given. Presented method can be applicable for long-term planning in a competitive electricity market due to possibility of unit commitment calculations with different electrical energy price during scheduling horizon. (authors)

  4. optimal selection of hydraulic turbines for small hydro electric power

    African Journals Online (AJOL)

    eobe

    Keywords: optimal selection, SHP turbine, flow duration curve, energy efficiency, annual capacity factor. 1. INTRODUCTION ... depleted, with adverse environmental impacts downstream ..... Technologies, Financing Cogeneration and Small -.

  5. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  6. Hydro-power installation on the Prascherbach, Nufenen, Switzerland; Wasserkraftwerk Prascherbach, Nufenen. Programm Kleinwasserkraftwerke - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Marugg, R.

    2008-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) describes project variants for the replacement of an 80-year old hydro-power plant in Nufenen, Switzerland. Details on the new power station, which is to produce 300 kilowatts of electrical power using a height difference of 340 metres is to provide 1.3 million kilowatt-hours of electricity per year. The report reviews the history of the project, which goes back to the 1990s and describes the project approved in 1999 as well as the updates made afterwards. The financial aspects of the project and remuneration for the power generated are examined. Environmental issues connected with the project are also discussed. The proposed course of events involved in taking further steps toward the realisation of the installation are discussed. An appendix includes copies of the various documents pertaining to cost estimation, water quantities, environmental protection and the granting of building permission.

  7. A modified gravitational search algorithm based on a non-dominated sorting genetic approach for hydro-thermal-wind economic emission dispatching

    International Nuclear Information System (INIS)

    Chen, Fang; Zhou, Jianzhong; Wang, Chao; Li, Chunlong; Lu, Peng

    2017-01-01

    Wind power is a type of clean and renewable energy, and reasonable utilization of wind power is beneficial to environmental protection and economic development. Therefore, a short-term hydro-thermal-wind economic emission dispatching (SHTW-EED) problem is presented in this paper. The proposed problem aims to distribute the load among hydro, thermal and wind power units to simultaneously minimize economic cost and pollutant emission. To solve the SHTW-EED problem with complex constraints, a modified gravitational search algorithm based on the non-dominated sorting genetic algorithm-III (MGSA-NSGA-III) is proposed. In the proposed MGSA-NSGA-III, a non-dominated sorting approach, reference-point based selection mechanism and chaotic mutation strategy are applied to improve the evolutionary process of the original gravitational search algorithm (GSA) and maintain the distribution diversity of Pareto optimal solutions. Moreover, a parallel computing strategy is introduced to improve the computational efficiency. Finally, the proposed MGSA-NSGA-III is applied to a typical hydro-thermal-wind system to verify its feasibility and effectiveness. The simulation results indicate that the proposed algorithm can obtain low economic cost and small pollutant emission when dealing with the SHTW-EED problem. - Highlights: • A hybrid algorithm is proposed to handle hydro-thermal-wind power dispatching. • Several improvement strategies are applied to the algorithm. • A parallel computing strategy is applied to improve computational efficiency. • Two cases are analyzed to verify the efficiency of the optimize mode.

  8. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  9. 77 FR 37031 - Don W. Gilbert Hydro Power, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14367-001] Don W. Gilbert... No.: 14367-001. c. Date filed: May 30, 2012. d. Applicant: Don W. Gilbert Hydro Power, LLC. e. Name... Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708.] h. Applicant Contact: Don W. Gilbert and...

  10. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  11. Modelling the economics of combined wind/hydro/diesel power systems

    International Nuclear Information System (INIS)

    Sinha, A.

    1993-01-01

    A model that stimulates the performance and economics of a combined wind/hydro/diesel plant with pumped storage has been developed. It is applied to a hypothetical site to demonstrate how a subset of the cheapest configuration of plant sizes may be identified, illustrating in particular the trade-off between the hydro storage capacity and the wind turbine penetration. It seems that, with the wind and water regimes employed, pumped storage is unlikely to have significant benefits, but may be beneficial in areas without natural inflow, in which case the reservoir is used as a store for excess wind output. (author)

  12. HydroPak: concept design and analysis of a packaged cross-flow turbine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed.

  13. Experimental Evaluation of Performance of Constant Power Prime-Mover Driven Isolated 3-φ SEIG for Pico-Hydro Power Generation System in Remote Mountainous Region of Himalayas

    Directory of Open Access Journals (Sweden)

    Rathore Umesh C.

    2016-01-01

    Full Text Available This paper presents the experimental evaluation of the performance of 3-φ self-excited induction generator (SEIG suitable for pico-hydro power generation system feeding domestic load in remote mountainous region. The use of induction generators is most suitable for renewable energy conversion systems due to their enormous advantages over conventional synchronous generators. Important features of induction generators include the simplicity in construction, ruggedness, simplified control, ease in maintenance and small size per generated kW. The performance characteristics of 3-φ SEIG feeding isolated load are evaluated using MATLAB-Simulink model based on the prevalent renewable energy sources inputs and loading conditions in mountainous terrain of Himalayas. The results are validated using an experimental set-up comprising of 3-φ, 3 HP induction motor run as 3- φ induction generator driven by 5HP, 4-pole DC shunt motor acting as prime-mover.

  14. A combined hydro-nuclear-solar project for electric power production

    International Nuclear Information System (INIS)

    Yiftah, S.

    1985-01-01

    Some of the main, general-perspective themes of Dr. Alvin Weinberg's leadership and long and varied work are: the effect of present and future nuclear energy projects on society, not only in the United States but throughout the world; analysis, comparison, and combination of various sources of energy; extensive multiple use of nuclear energy complexes (so-called NUPLEX, for nuclear complex) for various areas of the world; and use of ''Big Technology'' and ''Big Science'' for solving, or helping to solve, political problems. A combined hydro-nuclear-solar project for electric power production is discussed, as well as two other energy-related engineering projects. Some of the projects originated or were inspired by work done at the Oak Ridge National Laboratory under the leadership of Dr. Alvin Weinberg. Also reported are the technical characteristics and interrelationships of the three components of the envisaged hydronuclear-solar project

  15. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  16. The design and performance of the first fully automatic non-grid 5 MW multi-diesel / mini hydro / battery converter power stations

    International Nuclear Information System (INIS)

    Ahmad Shadzli Abdul Wahab

    2000-01-01

    Electricity power supply in remote communities and towns are traditionally and hitherto supplied by diesel generator sets of varying capacities and sizes -from few kilowatt to few megawatts. Its proven to be versatile, robust, modular cheaper capital investment, reliable and easy to operate and maintain. These features are what make diesel generators most preferred choice for generating electric power to power hungry remote communities. The main draw back, though, is its increasingly high cost of operation and maintenance, largely due to upward trend in the cost of diesel fuel, high cost of engines spare parts plus the inflationary nature of salary and wages of operators. For these reasons, engineers and technologists have for years worked tirelessly to find ways and means to reduce the O and M costs. One of the novel ideas was to hybrid the conventional diesel generating system with renewable energy resources, such as mini hydro, solar photovoltaic or wind energy. Many prototypes involving several configurations of energy resources eg diesel/PV/ battery, diesel/wind/battery, diesel/mini hydro/battery have been tested but none has so far has been as successful as Sema/ Powercorp automated Intelligent Power System (IPS). Based on microprocessor hardware, powerful computer software programming and satellite communication technology, the IPS -equipped diesel power station can now now be operated fully automatic with capability of remote control and monitoring. The system is versatile in maximising the use of renewable energy energy resources such as wind, mini hydro or solar thereby reducing very significantly the use of diesel fuel. Operation and maintenance costs also are reduced due to the use of minimum manpower and and increase in fuel efficiency of the engines. The tested and proven IPS technology has been operating successfully for the last ten years in remote diesel stations in Northern Territory, Australia, Rathlin Island, Northern Ireland and its latest and

  17. Icogne irrigation-network hydro-power installation; Petite centrale hydro-electrique sur le reseau d'irrigation de la commune d'Icogne. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Cordonier, N.; Rey, G. [Nicolas Cordonier et Gilles Rey SA, Sierre (Switzerland)

    2007-01-15

    This final report for the Swiss Federal Office of Energy (SFOE) presents the feasibility study for a hydro-power installation that uses an existing municipal irrigation scheme in the alpine region of Icogne, Switzerland. The report takes a look at the present situation which features, apart from the irrigation scheme itself, mountain torrents and artificial compensation lakes. The concept for the use of the available water pressure due to height-difference between these two lakes to drive a turbine and so generate electricity is described. Variants considered are reviewed. Investment and operating costs are examined as are the electricity production and the cost of the power generated. Finally, investments and other financial aspects are looked at and the further course of action is discussed.

  18. IPPSO raises Hydro exports in smog negotiations

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Independent Power Producers of Ontario (IPPSO) requested federal and provincial committees negotiating atmospheric emission standards to review Ontario Hydro's export wheeling plans. IPPSO alleges that Ontario Hydro is preparing to apply pressure on the Canadian export approval process, and is building up a major effort that will increase emissions, contrary to the objectives embodied in a number of environment protection projects such as the Ontario Smog Plan, The Federal-Provincial NOx Management Plan, the Strategic Options Plan, or the Convention on Long-Range Transboundary Air Pollution Draft NOx Protocol Negotiations. IPPSO alleges further that while Ontario Hydro is one of Canada's largest single emitter of greenhouse gases NOx, and SO 2 , and as a public sector corporation it should be the most amenable to serving the public good, the Corporation is doing exactly the opposite: it actively prevents production of electricity from less polluting sources. It is IPPSO's contention that Ontario Hydro's desire to control the Ontario market could come at significant cost to the environment

  19. Feasibility study of a Green Power Plant. Final report. [Offshore pumped hydro storage

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-03-15

    This project is a technical evaluation and a feasibility study of a concept called the Green Power Plant (GPP), developed by Seahorn Energy Aps. The Green Power Plant is an offshore pumped hydro storage facility constructed from prefabricated elements and with integrated renewable energy production. Pumped hydro storage is a known technology with a proven roundtrip energy storage efficiency of 80%. The focus of the GPP project is on simplifying and industrializing the construction of the reservoir wall, thereby achieving a cost efficient solution. The reservoir structure is dependent on the site on which the reservoir is established, thus Kriegers Flak in the Baltic Sea has been chosen as basis for the technical evaluation. As soil conditions vary, the technical evaluations have been based on a general soil profile. A water depth of 25m has been chosen as basis for the evaluation. A reservoir with a diameter of 2 km has been evaluated as baseline scenario. Feasibility of the GPP was evaluated based on the cost and income estimates. For the baseline scenario an internal rate of return of 6.6% was found for a period of 35 years. A sensitivity analysis reveals internal rates of return over 35 years varying from 4.9% to 10.9%. Especially larger reservoir diameters increase profitability of the GPP. The results from this project will be utilized in raising funds for further development of the GPP concept. Seahorn Energy Aps aims at optimizing the wind turbine integration, the steel pile wall structure and the pump-turbine integration in a future project towards construction of a demonstration facility. (LN)

  20. Hydro power projects in Pakistan- who pays the price

    International Nuclear Information System (INIS)

    Baig, N.

    2005-01-01

    In this paper an attempt has been made to trace the procedures that have been adopted to arrive at the market value of the assets lost in the construction of Ghazi Barotha Hydro Power Project. There is nothing secret or mysterious about the value of land. It is a commodity commonly dealt with and like every other commodity it. has a price, which can be ascertained within certain limits. This price, however, constantly varies according to the variations of the supply and demand and it is impossible to fix it at any given time with mathematical accuracy. The question of fair compensation is not an algebraic problem, which would be solved by an abstract formula. Compensation must be determined by reference to the price, which a willing vendor might reasonably expect to obtain from a willing purchaser. Although market value cannot be calculated with mathematical precision and a certain amount of conjecture is inevitable, but in valuing one should be careful not to go too far in this direction. (author)

  1. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  2. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  3. Analysis of the impact of connecting a larger number of small hydroelectric power plants to the short-circuit currents values and relay protection system of distribution network

    Directory of Open Access Journals (Sweden)

    Sučević Nikola

    2017-01-01

    Full Text Available In this paper the influence of a large number of small hydro power plants on the short-circuit currents is analysed, as well as the operation of the relay protection system within the real distribution network in Serbia. The necessary modification of the existing protection functions, as well as the implementation of the new proposed protection functions, are presented and discussed. Network modeling and analysis are performed using the program tool DIgSILENT PowerFactory.

  4. 78 FR 77118 - KC Small Hydro, LLC; Notice of Amended Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-12-20

    ..., Motions To Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an... 28, 2013, application and sent an acceptance letter to KC Scoby Hydro, LLC. Subsequently, On October 28, 2013, KC Scoby Hydro, LLC, amended its preliminary permit application to change its name to KC...

  5. Hydro-Quebec opens up, expects positive reaction from FERC

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1997-01-01

    Hydro-Quebec Energy Services US (HQUS), the marketing arm of Hydro-Quebec, amended its application for a power marketing licence with the Federal Energy Regulatory Commission (FERC), by offering to open up five per cent of the wholesale Quebec electricity market to competition. The Corporation hopes that its revised application will satisfy FERC to grant HQUS a power marketer licence, with the right to sell electricity in the US at market-based rates. Hydro-Quebec insiders believe that in addition to opening up the market to competition, thereby equalizing market conditions on both sides of the border, the Corporation's chances of receiving the licence also have been improved by the creation of the provincial energy board (Regie de l'energie) which in future will regulate electricity and gas transmission through Quebec, and establish transmission tariffs. FERC ruling is expected within 60 days of the March 7, 1997 amended application

  6. Coanda hydro intake screen testing and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Howarth, J.

    2001-07-01

    The objective of this project has been to evaluate the effectiveness, suitability and cost benefit of the Aquashear Coanda effect, maintenance free intake screen for use in small hydro system intakes. (author)

  7. Pumping station design for a pumped-storage wind-hydro power plant

    International Nuclear Information System (INIS)

    Anagnostopoulos, John S.; Papantonis, Dimitris E.

    2007-01-01

    This work presents a numerical study of the optimum sizing and design of a pumping station unit in a hybrid wind-hydro plant. The standard design that consists of a number of identical pumps operating in parallel is examined in comparison with two other configurations, using one variable-speed pump or an additional set of smaller jockey pumps. The aim is to reduce the amount of the wind generated energy that cannot be transformed to hydraulic energy due to power operation limits of the pumps and the resulting step-wise operation of the pumping station. The plant operation for a period of one year is simulated by a comprehensive evaluation algorithm, which also performs a detailed economic analysis of the plant using dynamic evaluation methods. A preliminary study of the entire plant sizing is carried out at first using an optimization tool based on evolutionary algorithms. The performance of the three examined pumping station units is then computed and analyzed in a comparative study. The results reveal that the use of a variable-speed pump constitutes the most effective and profitable solution, and its superiority is more pronounced for less dispersed wind power potential

  8. Hydro-Quebec proudly celebrates 50 years of service

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The history of the electric utility Hydro-Quebec is reviewed from its creation in 1944 as the Hydroelectric Commission of Quebec. The utility inherited an installed capacity of 696 MW and it first went about standardizing electricity supply conditions and establishing equal rates in the Montreal area. It began major construction projects in the mid-1950s with the Bersimis and Carillon hydroelectric plants. By 1962, installed capacity reached 3,657 MW. In 1963, Hydro-Quebec bought 10 private electricity distribution companies, 45 cooperatives, and a series of private or municipal systems. In 1965, the utility commissioned the world's first 735-kV transmission line. In 1967, Hydro-Quebec opened its research institute, and another laboratory specializing in electrotechnologies was opened in 1987. The 1970s were noted for the James Bay hydroelectric projects, the development of which was eventually governed by the landmark James Bay and Northern Quebec Agreement of 1975. Electricity exports greatly expanded in the 1970s and early 1980s as larger hydroelectric projects came on stream. Challenges of the 1990s include service quality, environmental issues, energy efficiency, and conservation. Hydro-Quebec's Energy Efficiency Project has a target of annual savings of 9.3 TWh by the year 2000. Energy efficiency and power system upgrading are priorities for serving future customer needs. Hydro-Quebec continues to promote hydroelectric power as the cheapest, most environmentally benign form of energy and future generating stations in progress include phase II of the LaGrande complex (to be completed 1996). 2 figs

  9. comparative measurement o river for small hydro tive measurement

    African Journals Online (AJOL)

    eobe

    Keywords: Keywords: small hydropower, electric power, volum ... gathering systems. .... or revolving cups connected to the end. ..... Also, the float velocity may have been affected by wind ... completely dedicated as off-grid supply can meet the.

  10. Realisation of a small hydro power plant in the new water reservoir of the water supply of the San Abbondio municipality; Realizzazione di una microcentrale nel nuovo serbatoio dell'acquedotto del comune di S. Abbondio. Progetto definitivo nuovo serbatoio. Progetto di massima e studio varianti microcentrale

    Energy Technology Data Exchange (ETDEWEB)

    Conti, M.

    2008-12-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the construction project of a new water reservoir including a micro-scale hydro power plant in the drinking-water supply of the municipality of San Abbondio, Switzerland. Following the development of residential areas a new water reservoir located at higher elevation is needed. A former preliminary study had demonstrated the feasibility of a micro-scale hydro power plant in the water supply. The adaptation of the plant design to the new situation is described. Investment cost is estimated and several variants are compared. Recommendations are given to the authorities.

  11. Perceived risk of nuclear and hydro electrical power generation in Colombia

    International Nuclear Information System (INIS)

    Munera, H.A.

    1982-12-01

    This report deals with the estimation of risk factors of hydro plants and the perception of risks and benefits of nuclear, hydropower and coal by a selected part of the public. Historical data (1922 - 1979) on occurrence of earthquakes in Colombia demonstrate high seismicity (3,489 incidents) for the country in total and also for areas where the majority of hydro projects are to be located. Model-based calculations of regional probabilities for earthquakes at prospective dam-sites with a magnitude of 7 (Richter scale) or larger resulted in p=0.038/year for a 50 year recurrence period for high and p=0.0004/year for low seismicity areas. Attitudes towards three energy systems were elicited from 130 university students and graduates with a questionnaire based on a psychometric model. Generally attitudes were most favourable towards hydro, less favourable towards coal and more critical towards nuclear. Nuclear is perceived to have economic advantages, but to pose environmental, individual and societal risks. Respondents PRO and CON nuclear agree on the lack of risk from hydropower

  12. Neuro-fuzzy modelling of hydro unit efficiency

    International Nuclear Information System (INIS)

    Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents neuro-fuzzy method for modeling of the hydro unit efficiency. The proposed method uses the characteristics of the fuzzy systems as universal function approximates, as well the abilities of the neural networks to adopt the parameters of the membership's functions and rules in the consequent part of the developed fuzzy system. Developed method is practically applied for modeling of the efficiency of unit which will be installed in the hydro power plant Kozjak. Comparison of the performance of the derived neuro-fuzzy method with several classical polynomials models is also performed. (Author)

  13. Commercialisation of small hydro through community participation

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, R.

    1999-07-01

    This report gives details of a project aimed at deriving models for the development of a community owned and managed small hydroelectric power plant in Wales for testing financial and legal structures, and assessing models for the sale of electricity. The formation of the community group, technical assessment of the project, the scoping for environmental effects, and legal and financial options for community renewable energy projects are discussed. Electricity trading options are considered, and the project economics and financing are analysed. (UK)

  14. Commercialisation of small hydro through community participation

    International Nuclear Information System (INIS)

    Stevenson, R.

    1999-01-01

    This report gives details of a project aimed at deriving models for the development of a community owned and managed small hydroelectric power plant in Wales for testing financial and legal structures, and assessing models for the sale of electricity. The formation of the community group, technical assessment of the project, the scoping for environmental effects, and legal and financial options for community renewable energy projects are discussed. Electricity trading options are considered, and the project economics and financing are analysed. (UK)

  15. The 'Chriz' small hydro project; Kleinkraftwerk Chriz - Konzessionsprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Amacker, P.

    2008-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the project for the renewal of a small hydropower installation in the village of Eischoll in the Swiss Alps. The history of the power station is reviewed and its present state is analysed. The possibilities for its renewal and project financing are discussed, as are rights concerning the use of water and regional planning aspects. The project foresees the use of various older installations and the construction of a new turbine house in the valley. Details on dimensions, the proposed installed power and energy production of the scheme are presented as well as details on the connection to the electricity mains. Environmental aspects and details on the costs and time-scales involved in the construction of the small power station are presented.

  16. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  17. Total renewal of a small hydro project on the Engstligenalp - Licence and construction project; Bergbahnen Engstligenalp AG - Gesamterneuerung Kleinwasserkraftwerk. Konzessions- und Bauprojekt - Technischer Bericht mit Beilagen

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M.

    2009-05-15

    This report for the Swiss Federal Office of Energy (SFOE) deals with the total renewal of a small hydro scheme operated by the Engstligenalp aerial cableway in Switzerland. The cableway operator considers itself as part of the national effort to support sustainability. The refurbished hydropower installation will produce power for around 500 homes. The hydrology of the catchment area involved, quantities of water available and residual water conditions as well as the existing installations are described and discussed. Stipulations concerning landscape conservation are noted. The renewal project is discussed and details are given on the dam, water intake, pressure pipe and regulation. The new underground facilities for the horizontal-axis turbine, generator and electrical equipment are described. Finally environmental aspects, energy production and economic viability are discussed.

  18. Manitoba Hydro-Electric Board 52. annual report : Building as one

    International Nuclear Information System (INIS)

    2003-01-01

    A provincial Crown corporation, Manitoba Hydro serves approximately 502,000 customers throughout Manitoba with electric energy, and provides natural gas service to 251,000 customers in several communities in southern Manitoba. In addition, Manitoba Hydro exports electricity to electric utilities and marketers in the mid-western United States, Ontario, and Saskatchewan. In 2002, Winnipeg Hydro was purchased from the City of Winnipeg. Records were broken for historical peak demand for electricity (24 February 2003) and natural gas (22 January 2003). A study of wind power generation was launched, with seven sites being monitored. A Power Smart program focusing on geothermal heat pump systems also offered assistance to Manitoba homeowners. Successful conversion of the Selkirk Generating Station from coal to natural gas was achieved. In Brandon, a 260 mega watt (MW) natural gas combustion turbine plant was opened. Over $29 million in loans were issued to customers under the Home Comfort and Energy Savings Program. Electricity rates for residential customers remained unchanged, as did those for large industrial customers. Approval was received by the National Energy Board to export 500 MW of electricity to Northern States Power. A new international interconnection was brought into service in November 2002 between Glenboro, Manitoba and Harvey, North Dakota. The ISO 14001 international certification for environmental management systems was awarded to Manitoba Hydro. tabs., figs

  19. Technological development with reference to hydro-power, nuclear, and alternative energy technologies

    Energy Technology Data Exchange (ETDEWEB)

    Burns, T R; Baumgartner, T

    1985-01-01

    This report outlines a theoretical framework for describing and analyzing the introduction of new technologies and the development of socio-technical systems associated with such innovations. While the report is largely theoretical in nature, it refers to certain strategic aspects of the development of nuclear, hydro-power and alternative energy systems. The ease with which technological innovation and development occur, the directions they take, and the impacts they have on the social and physical environments depend not only on purely technical and economic factors. Barriers, regulators and facilitators are inherent in the socio-political, institutional and cultural structures within which any attempts at innovation and technological development take place. The final section of the report explores some of the implications of the theory for policy and strategy, including consideration of environmental policy.

  20. It's done... or the unmanned operation in hydro power plants

    International Nuclear Information System (INIS)

    Chudy, M.

    2009-01-01

    Looking back at the two years of activities performed while launching the individual Hydro Power Plants (HPP) of the Slovenske elektrarne, a.s. into the unmanned operation, there was 'quantum' of work done during the implementation of each new HPP in the area of group output regulation, substation management, failure and alarm record and evaluation system, technological and information service. It is a good feeling to see the results of the work - when it works. Someone could say that we just test the project at one HPP and the others just get implemented. The fact that the HPPs differ from each other brings its specifics, which needed to be handled individually in the SW or HW area, or in terms of communication. We should definitely mention the enthusiasm and helpfulness of the employees even at the cost of their free time spent in launching the power plants into unmanned operation. The reward for the hours spent dealing with the technical issues and revealing the shortcomings in the whole operation management process is today in the greater possibilities of gaining an overviews of the events in the operation of each HPP or TG generation unit. However, our hands are little less free to perform interventions in the control systems - time for the maintenance - necessary planning of the outages - coordination within the operation preparation. (author)

  1. Economically viable and environment-friendly hydro energy in Estonia

    International Nuclear Information System (INIS)

    Saks, Ants; Velner, Harald

    2001-01-01

    Hydro energy has been in oblivion in Estonia for about 30 years now. During the 1960s, most of Estonia's small hydropower plants were closed down, just as it was done in the whole Soviet Union. As the only larger hydro plant, the 125 MW plant in Narva, was situated on the Russian side of the Narva River, there were only two or three small hydro plants left. Even those were exploited at low capacity and mainly for heating the buildings. It was not until the 1990s that a number of enthusiasts started to re-establish the hydro plants by reconstructing old installations. The pre-feasibility study 'Hydropower in Estonia' proposed by Estonian and Swedish experts, showed that the restoration of the hydropower plants and watermills is economically feasible and technically possible if advanced technology is used. Hydropower as an alternative ('green') energy source should be used in the best technical-economical way. The first pilot plant in Estonia, the 200 kW Kamari plant was constructed in 1998 with compact-propeller units, in co-operation with Waterpumps WP Oy and ABB. Today, ten new plants have been constructed or are under construction. Hydropower plants/watermills should be reconstructed in accordance with the legislative acts on environment protection

  2. From concept to construction: a 15 MW small hydro project

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, S.; Neegan, K.

    1995-12-31

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for `Mother Earth` in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project.

  3. From concept to construction: a 15 MW small hydro project

    International Nuclear Information System (INIS)

    Stephens, S.; Neegan, K.

    1995-01-01

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for 'Mother Earth' in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project

  4. Optimizing Hydro Power Turbines in Order to Secure the Passage of Fishes in Khuzestan province

    Directory of Open Access Journals (Sweden)

    Moona Mohammadi

    2015-04-01

    Full Text Available Nowadays,it is important to consider environmental issues,as ecological problems and their severe effect intensify in Iran,particularly in Khuzestan province.The environmental effects of hydroelectric plants are highly regarded due to their significant impact on an extensive area.The lack of safe path for fish passing through the turbines is one of these damages. In order to deal with these challenges,researchers are trying to optimize hydro power turbines.In this optimization,old runners were replaced,while conditions of fish passing through the turbines and fish survival have been improved.Considering the existence of six hydroelectric power plants in Khuzestan province,it would be possible to conduct optimization or constructing studies with a fish-friendly approach for the safe passage of fishes to slightly reduce the extent of environmental damages.

  5. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  6. A new islanding detection technique for multiple mini hydro based on rate of change of reactive power and load connecting strategy

    International Nuclear Information System (INIS)

    Laghari, J.A.; Mokhlis, H.; Bakar, A.H.A.; Karimi, M.

    2013-01-01

    Highlights: • The requirement of DG interconnection with existing power system is discussed. • Various islanding detection techniques are discussed with their merits and demerits. • New islanding detection strategy is proposed for multiple mini hydro type DGs. • The proposed strategy is based on dq/dt and load connecting strategy. • The effectiveness of strategy is verified on various other cases. - Abstract: The interconnection of distributed generation (DG) into distribution networks is undergoing a rapid global expansion. It enhances the system’s reliability, while simultaneously reduces pollution problems related to the generation of electrical power. To fully utilize the benefits of DGs, certain technical issues need to be addressed. One of the most important issues in this context is islanding detection. This paper presents a new islanding detection technique that is suitable for multiple mini-hydro type DG units. The proposed strategy is based on the rate of change of reactive power and load connecting strategy to detect islanding within the system. For a large power mismatch, islanding is detected by rate of change of reactive power only. However, for a close power mismatch, the rate of change of reactive power initiates a load connecting strategy, which in turn alters the load on the distribution network. This load variation in the distribution network causes a variation in the rate of change of reactive power, which is utilized to distinguish islanding and other events. The simulation results show that the proposed strategy is effective in detecting islanding occurrence in a distribution network

  7. Hydro-economic performances of streamflow withdrawal strategies: the case of small run-of-river power plants

    Science.gov (United States)

    Basso, Stefano; Lazzaro, Gianluca; Schirmer, Mario; Botter, Gianluca

    2014-05-01

    River flows withdrawals to supply small run-of-river hydropower plants have been increasing significantly in recent years - particularly in the Alpine area - as a consequence of public incentives aimed at enhancing energy production from renewable sources. This growth further raised the anthropic pressure in areas traditionally characterized by an intense exploitation of water resources, thereby triggering social conflicts among local communities, hydropower investors and public authorities. This brought to the attention of scientists and population the urgency for novel and quantitative tools for assessing the hydrologic impact of these type of plants, and trading between economic interests and ecologic concerns. In this contribution we propose an analytical framework that allows for the estimate of the streamflow availability for hydropower production and the selection of the run-of-river plant capacity, as well as the assessment of the related profitability and environmental impacts. The method highlights the key role of the streamflow variability in the design process, by showing the significance control of the coefficient of variation of daily flows on the duration of the optimal capacity of small run-of-river plants. Moreover, the analysis evidences a gap between energy and economic optimizations, which may result in the under-exploitation of the available hydropower potential at large scales. The disturbances to the natural flow regime produced between the intake and the outflow of run-of-river power plants are also estimated within the proposed framework. The altered hydrologic regime, described through the probability distribution and the correlation function of streamflows, is analytically expressed as a function of the natural regime for different management strategies. The deviations from pristine conditions of a set of hydrologic statistics are used, jointly with an economic index, to compare environmental and economic outcomes of alternative plant

  8. BC Hydro experiences the power of engineering document management software

    International Nuclear Information System (INIS)

    Wilkins, A.

    2000-01-01

    The recent popularity of electronic document management software (EDMS), specifically designed for engineering CAD/CAM drawings that holds the promise of reducing paper-pushing and freeing up organizational resources for more productive purposes, is discussed. To illustrate how such systems function, a document management system installed at BC Hydro, with over 2,500 users in two main engineering groups is described. The new system - FileNET - replaces several older systems that have been used as stand-alone systems in various divisions of BC Hydro for some time. Instead of integrating the entire file of some 750,000 documents, the new system has complete records of some 70,000 of the most recent CAD drawings and an on-line index to the older file that is used less frequently. Access to the entire storehouse of drawings is said to be fast, efficient and secure. Automated document control procedures during work-in-progress, viewing, redlining capabilities, seamless integration with CAD tools and Web access to drawings from anywhere within the two engineering divisions, are some of the most noteworthy characteristics of the new system. It does not completely replace paper, but it does promise significant streamlining of the paper handling function. It also ensures that BC Hydro's central computer is the prime repository of all documents and drawings, and that this valuable record of environmental. legal, regulatory and other public policy importance is instantly available, without the need to handle paper

  9. Hydro-power production and fish habitat suitability: Assessing impact and effectiveness of ecological flows at regional scale

    Science.gov (United States)

    Ceola, Serena; Pugliese, Alessio; Ventura, Matteo; Galeati, Giorgio; Montanari, Alberto; Castellarin, Attilio

    2018-06-01

    Anthropogenic activities along streams and rivers may be of major concern for fluvial ecosystems, e.g. abstraction and impoundment of surface water resources may profoundly alter natural streamflow regimes. An established approach aimed at preserving the behavior and distribution of fluvial species relies on the definition of ecological flows (e-flows) downstream of dams and diversion structures. E-flow prescriptions are usually set by basin authorities at regional scale, often without a proper assessment of their impact and effectiveness. On the contrary, we argue that e-flows should be identified on the basis of (i) regional and (ii) quantitative assessments. We focus on central Italy and evaluate the effects on habitat suitability of two near-threatened fish species (i.e. Barbel and Chub) and an existing hydro-power network when shifting from the current time-invariant e-flow policy to a tighter and seasonally-varying soon-to-be-enforced one. Our example clearly shows that: (a) quantitative regional scale assessments are viable even when streamflow observations are entirely missing at study sites; (b) aprioristic e-flows policies may impose releases that exceed natural streamflows for significantly long time intervals (weeks, or months); (c) unduly tightening e-flow policies may heavily impact regional hydro-power productivity (15% and 42% losses on annual and seasonal basis, respectively), yet resulting in either marginal or negligible improvements of fluvial ecosystem.

  10. Bearing Diagnostics of Hydro Power Plants Using Wavelet Packet Transform and a Hidden Markov Model with Orbit Curves

    Directory of Open Access Journals (Sweden)

    Gabriel Pino

    2018-01-01

    Full Text Available The contribution of a medium-sized hydro power plant to the power grid can be either at base load or at peak load. When the latter is the most common operation mode, it increases the start and stop frequency, intensifying the hydro turbine components’ degradation, such as the guide bearings. This happens due to more frequent operation in transient states, which means being outside the service point of the machines’ nominal condition, consisting of speed, flow, and gross head. Such transient state operation increases the runner bearings’ mechanical vibration. The readings are acquired during the runner start-ups and filtered by a DC component mean value and a wavelet packet transform. The filtered series are used to estimate the relationship between the maximum orbit curve displacement and the accumulated operating hours. The estimated equation associated with the ISO 7919-5 vibration standards establishes the sojourn times of the degradation states, sufficient to obtain the transition probability distribution. Thereafter, a triangular probability function is used to determine the observation probability distribution in each state. Both matrices are inputs required by a hidden Markov model aiming to simulate the equipment deterioration process, given a sequence of maximum orbit curve displacements.

  11. Hydro adventurers

    International Nuclear Information System (INIS)

    Wood, Janet

    2000-01-01

    Some of the changes brought about by privatisation of the hydroelectric power industry in Ecuador are discussed. At present, about 25% of the population has no electricity supply; in the remaining areas demand is increasing. Seven new facilities are presently under discussion and these are described briefly. A plant at Abitugua is to be developed as a 'merchant plant' and the meaning and implications of this are described in detail. The present financing programme for Abituaga and an alternative financing programme are detailed. By 2010, some 40% of Ecuador's electricity is expected to come from hydro

  12. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  13. Green power programs in Canada : 2003 : overview of Government green power policies, utility green power implementation initiatives, green power and certificate marketing programs, and their benefits

    International Nuclear Information System (INIS)

    Whitmore, J.; Bramley, M.; Holmes, R.

    2004-09-01

    Green power is defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. It offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities in Canada associated with these four categories in 2003 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Green power generation facilities in 2003 totaled 775 MW of capacity compared to 539 MW in 2002. Hydro capacity represented 41 per cent, followed by wind capacity at 40 per cent and wood waste at 17 per cent. Most of the green power generation facilities in 2003 were located in Alberta, followed by British Columbia, Ontario and Quebec. 230 refs., 8 tabs., 1 fig

  14. Assessing the role of large hydro in Canada's electricity future

    International Nuclear Information System (INIS)

    Lee Pochih

    1992-01-01

    Electric power in Canada was first generated by steam in the 1880s. The use of hydroelectricity spread rapidly due to abundant water resources and the nationalization of power companies by the provinces; by 1920, 97% of Canadian electricity production came from hydroelectric plants. Thermal generation became competitive by the 1960s, when most of the best hydro sites had been developed, and nuclear generation also started gaining a share of the market. By 1991, hydroelectricity's share of Canadian power production had declined to around 60%. Hydroelectric power has long been used as an instrument of Canadian industrial policy. Given the amount and importance of utility capital expenditures, it was recognized that hydropower development could serve such policy objectives as job creation, industrial development, and macroeconomic stabilization. Creation of provincially owned utilities led to construction of large hydroelectric projects, notably in Quebec, British Columbia, Manitoba, and Newfoundland. The 20 largest hydroelectric power plants in Canada have a total installed capacity of 35,704 MW, representing ca 59% of Canada's total 1991 hydro capacity. The construction of such large projects is not expected to proceed as quickly as in the past because of environmental concerns. However, a number of factors favor continuation of development of hydro resources: a remaining potential estimated at ca 44,000 MW; simplification of electricity export regulations; more stringent air pollution standards that favor non-polluting energy sources; and a moratorium on nuclear power plants in Ontario. 4 tabs

  15. A Novel Frequency Restoring Strategy of Hydro-PV Hybrid Microgrid

    DEFF Research Database (Denmark)

    Wei, Feng; Kai, Sun; Guan, Yajuan

    2014-01-01

    . The existence of frequency steady-state error and the slow active power/frequency dynamic response are inevitable. Therefore, a novel frequency restoring strategy for the hydro-PV hybrid microgrid based on the improved hierarchical control of PV systems is proposed in this paper. The output active power of PV......The conventional PV systems based on the voltage inverters only inject dispatched power to the utility grid when they work at a grid-connected mode in the hydro-PV hybrid microgrid. Due to the droop method employed for load sharing between generators, as well as the enormous inertia of system...... systems is controlled by an extra frequency restoring controller resided in the tertiary control level. The frequency steady-state error is eliminated through regulating and rebalancing the power flow between the hydropower and the PV system. The proposed strategy has verified through simulations...

  16. Non-linear multi-objective model for planning water-energy modes of Novosibirsk Hydro Power Plant

    Science.gov (United States)

    Alsova, O. K.; Artamonova, A. V.

    2018-05-01

    This paper presents a non-linear multi-objective model for planning and optimizing of water-energy modes for the Novosibirsk Hydro Power Plant (HPP) operation. There is a very important problem of developing a strategy to improve the scheme of water-power modes and ensure the effective operation of hydropower plants. It is necessary to determine the methods and criteria for the optimal distribution of water resources, to develop a set of models and to apply them to the software implementation of a DSS (decision-support system) for managing Novosibirsk HPP modes. One of the possible versions of the model is presented and investigated in this paper. Experimental study of the model has been carried out with 2017 data and the task of ten-day period planning from April to July (only 12 ten-day periods) was solved.

  17. Brighter for small power plants

    International Nuclear Information System (INIS)

    Haaland, Leif

    2003-01-01

    The article presents a small tunnel drilling machine aimed at using for the construction of small hydroelectric power plants and mentions briefly some advantages economically and environmentally of both the machine and the power production solution

  18. Coupling X-band dual-polarized mini-radars and hydro-meteorological forecast models: the HYDRORAD project

    Directory of Open Access Journals (Sweden)

    E. Picciotti

    2013-05-01

    Full Text Available Hydro-meteorological hazards like convective outbreaks leading to torrential rain and floods are among the most critical environmental issues world-wide. In that context weather radar observations have proven to be very useful in providing information on the spatial distribution of rainfall that can support early warning of floods. However, quantitative precipitation estimation by radar is subjected to many limitations and uncertainties. The use of dual-polarization at high frequency (i.e. X-band has proven particularly useful for mitigating some of the limitation of operational systems, by exploiting the benefit of easiness to transport and deploy and the high spatial and temporal resolution achievable at small antenna sizes. New developments on X-band dual-polarization technology in recent years have received the interest of scientific and operational communities in these systems. New enterprises are focusing on the advancement of cost-efficient mini-radar network technology, based on high-frequency (mainly X-band and low-power weather radar systems for weather monitoring and hydro-meteorological forecasting. Within the above context, the main objective of the HYDRORAD project was the development of an innovative mbox{integrated} decision support tool for weather monitoring and hydro-meteorological applications. The integrated system tool is based on a polarimetric X-band mini-radar network which is the core of the decision support tool, a novel radar products generator and a hydro-meteorological forecast modelling system that ingests mini-radar rainfall products to forecast precipitation and floods. The radar products generator includes algorithms for attenuation correction, hydrometeor classification, a vertical profile reflectivity correction, a new polarimetric rainfall estimators developed for mini-radar observations, and short-term nowcasting of convective cells. The hydro-meteorological modelling system includes the Mesoscale Model 5

  19. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  20. Notes for remarks by William A. Farlinger, chairman of Ontario Hydro

    International Nuclear Information System (INIS)

    Farlinger, W.A.

    1997-01-01

    The advantages of convergence for gas and electric companies were discussed. Both utilities possess transmission lines, rights of way, billing systems and long-term customer relationships. The speaker, Chairman of Ontario Hydro, suggested that within a few years, customers may be in a position to choose their power supplier. Ontario Hydro's vision for convergence and the recent restructuring of the Corporation into three new signature companies (generation, transmission, retail) were described. In this process Ontario Hydro has taken steps toward open access to the grid by all producers, competition among many sellers and buyers, and choice of supplier by consumers for lower cost power. One of the basic driving forces for convergence in the energy field is the interchangeability of electricity or gas. Some municipalities have already implemented joint gas and electricity meter reading, and there are many other ways in which converge can provide cheaper power and better service to the consumer. Ultimately, convergence would mean that monopolies would disappear, as would the boundaries between the gas and electricity industries

  1. Small-scale hydro-electric scheme in Roches, Switzerland; Projet de concession. Petite centrale hydroelectrique de Roches

    Energy Technology Data Exchange (ETDEWEB)

    Hausmann, M.

    2006-07-01

    The small hydropower plant (SHPP) project 'PCH Roches' is planned to be built in Roches, a small village located in the Jura region of the canton of Bern. The goal of this undertaking is to reactivate a site with hydro potential of the river Birs on a section that was already well exploited by some ancient SHPP (since 1953 or probably even earlier). Several modifications were performed on this plant over the years; not all contributed positively on its production figures. Following a transfer of the water rights in 1987, claims became loud against the owner to perform maintenance on the river banks and to modify the weir such that a free passage for the fishes will be granted. Those issues contributed to inflate a conflict which ended in the repeal of the water rights and a total plant shut down in 2001. The new project plans to reuse the existing pen stock and to carry out some refurbishing activities to grant security and better performance. The weir and the intake structure are also redesigned such that the water storage can be somewhat raised for normal operation; a weir gate will however allow to better discharge the river in flood situations. A new turbine house will be erected at the current location where the tail water pen stock rejoins the river. Hence, the existing old turbine house will be obsolete and the upper and lower pen stock sections are to be linked with each other. Limited by the existing pen stock size, the new plant is expected to produce some 50 kW power and 362,000 kWh/year. This represents an increase in energy generation of around 200% compared with the ancient SHPP. Gross head is 5.38 m, net head 4.12 m with a turbine flow of at least 1.6 m{sup 3}/s. The expected energy sales price applicable to this project reaches about 0.17 CHF/kWh as per the current tariffs set by the grid owner. This project calls for the building of a state-of-the-art SHPP. It will avoid the total dismantling of the existing works to take place and allow

  2. Fifteen years of radioactive waste management at Ontario Hydro

    International Nuclear Information System (INIS)

    Carter, T.J.; Rao, P.K.M.

    1985-01-01

    Ontario Hydro is a large Canadian utility producing 84% (7394 MWe) of the Nuclear Electricity generated in Canada. The low- and intermediate-level radioactive wastes generated by the Ontario Hydro program are currently being managed at the Bruce Nuclear Power Development with various volume reduction, packaging and interim storage systems. Ontario Hydro also owns and operates a radioactive waste transportation system. Studies are in progress for final disposal of these wastes in a suitable geology in Ontario. Since its inception in 1971, Ontario Hydro's radioactive waste management program has evolved into providing a full fledged radioactive waste management capability to the utility's two nuclear generation centres at Pickering and Bruce, and later in the decade, to Darlington. This paper summarizes the various developments in this program; highlights the major facilities both in-service and planned to be built; reviews the experiences gained over fifteen years of in-house waste management; and discusses the proposed reorientation towards ultimate disposal of these wastes. 2 refs., 8 figs., 1 tab

  3. Hydro-Quebec looks to integrated development of Quebec and its regions

    International Nuclear Information System (INIS)

    Bissonnette, Lise

    1995-01-01

    Hydro-Quebec's telecommunication system, the largest private telecommunications network in Canada, was discussed. The network was set up to assure safety and efficiency of the power plants and energy transmission and distribution lines. By the year 2000 Hydro-Quebec will need electronic links with all its industrial, commercial and residential customers in order to guarantee competitive service and full customer satisfaction. Investments of about one half billion dollars have been earmarked to boost the capacity of their telecommunications grid and meet steadily growing needs. As a result of the very difficult negotiations to resolve the native land claims issue, Hydro-Quebec was forced to adapt a strict and far-reaching environmental policy, which is now beginning to pay off not only in environmental terms, but also in terms of goodwill among actual and prospective customers. As a result of these huge infrastructure projects Hydro Quebec will be in a position to guarantee people access to energy at a price that is among the lowest in the world. Although demand growth could slow, demand itself will not wane. As part of this overall strategy, Hydro-Quebec plans to defer large-scale projects, instead, for the foreseeable future it will concentrate on smaller power plants, some of which could be built on rivers that have already been tamed

  4. An overview of renewable energy in Spain. The small hydro-power case

    International Nuclear Information System (INIS)

    Montes, G.M.; Lopez, M. del Mar Serrano; Gamez, M. del Carmen Rubio; Ondina, A.M.

    2005-01-01

    Development of hydroelectric energy, a renewable source of power, is guaranteed and maintained by the Plan of Promotion of the Renewable Energies 1999-2010 (PLAFER). This is arrived at by means of a definition and establishment of a series of power objectives in which an increase in the hydroelectric sector in anticipated. This study corresponds to a revision of the present situation of the mini-hydraulic energy, it is expected of evolution, and development in Spain. (author)

  5. An overview of renewable energy in Spain. The small hydro-power case

    Energy Technology Data Exchange (ETDEWEB)

    Montes, G.M. [Universidad de Granada (Spain). Departamento de Ingenieria Civil; Lopez, M. del Mar Serrano [Institute for the Diversification and Saving of the Energy, Madrid (Spain). Hydroelectric Department; Gamez, M. del Carmen Rubio; Ondina, A.M. [Universidad de Granada (Spain). Departamento de Ingenieria Civil, Ingenieria de la Construccion

    2005-10-01

    Development of hydroelectric energy, a renewable source of power, is guaranteed and maintained by the Plan of Promotion of the Renewable Energies 1999-2010 (PLAFER). This is arrived at by means of a definition and establishment of a series of power objectives in which an increase in the hydroelectric sector in anticipated. This study corresponds to a revision of the present situation of the mini-hydraulic energy, it is expected of evolution, and development in Spain. (author)

  6. Hydro-Quebec : annual report 1998 : for today and tomorrow

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec is a publicly owned company with a single shareholder, the Quebec government. In 1998, the utility had over 31,400 MW in installed capacity, ranking it among North America's largest distributors of electrical energy. This report provides a review of progress and financial highlights including revenue, expenditure, financial expenses, net income, total assets, long term debt, shareholder's equity and the overall financial position of the utility. In 1998 sales totaled 161.4 TWh, with Quebec markets accounting for more than 88 percent and sales, outside Quebec accounting for 11.5 per cent. Three factors related to weather impacted the utility in 1998. The first was mild weather which brought down domestic and agricultural power consumption by 3 TWh compared with the average recorded in the past half-century. The second was low precipitation which caused Hydro-Quebec to turn to means other than hydroelectric generation to supply power to Quebec customers. These included start-up generation of the Tracy thermal generating station, reduction of sales on short-term markets outside Quebec, and electricity purchases on external markets. The third factor was the ice storm of January 1998, which caused significant damage to part of Hydro-Quebec's transmission and distribution systems. Throughout the year, Hydro-Quebec worked in reinforcing its power lines to prevent repetition of the devastation that occurred during the ice storm. In spite of the events of January 1998, the Utility remains committed to the growth and profitability orientations laid out in its Strategic Plan for 1998-2002. Significant progress was made in consolidating the Utility's position in international markets. Productive partnerships have been established with the Quebec Federation of Labour Solidarity Fund, and with Gaz de France. A network of international partners in a score of countries also has been developed. Hydro-Quebec has completed most of its preparations for Year 2000 readiness

  7. Vaye-Planaz drinking-water hydro-power installation; Petite centrale hydro-electrique de Vaye-Planaz sur le reseau d'eau potable de la commune de Grone. Etude de faisabilite. Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-02-15

    This final report for the Swiss Federal Office of Energy (SFOE) presents the concept for a hydro-power installation that uses an existing drinking-water supply system. The report takes a look at the present situation which features ground-water sources, a transport pipeline and two reservoirs. The concept for the use of the available water pressure due to height-difference to drive a turbine and so generate electricity is described. Variants considered are reviewed. Investment and operating costs are examined as are the electricity production and the cost of the power generated. Finally, investments and other financial aspects are looked at and the further course of action is discussed.

  8. Hydro-economic modelling in mining catchments

    Science.gov (United States)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using

  9. Optimal bidding in Turkey day ahead electricity market for wind energy and pumped storage hydro power plant

    Directory of Open Access Journals (Sweden)

    Ceyhun Yıldız

    2016-10-01

    Full Text Available In electrical grid; when the demand power increases energy prices increase, when the demand decreases energy prices decrease. For this reason; to increase the total daily income, it is required to shift generations to the hours that high demand power values occurred. Wind Power Plants (WPP have unstable and uncontrollable generation characteristic. For this reason, energy storage systems are needed to shift the generations of WPPs in time scale. In this study, four wind power plants (WPP which are tied to the Turkish interconnected grid and a pumped hydro storage power plant (PSPP that meets the energy storage requirement of these power plants are investigated in Turkey day ahead energy market. An optimization algorithm is developed using linear programming technique to maximize the day ahead market bids of these plants which are going to generate power together. When incomes and generations of the plants that are operated with optimization strategy is analyzed, it is seen that annual income increased by 2.737% compared with WPPs ‘s alone operation and generations are substantially shifted to the high demand power occurred hours.

  10. Workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. Part I

    International Nuclear Information System (INIS)

    1997-01-01

    The publication has been set up as proceedings of the workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. The proceedings consist of the following chapters: (1) BOT schemes as financial model of hydro power projects; (2) Application of pumped storage plants in the control of the Slovak power system and the possibility of pumped storage plant Ipel exploitation towards the year 2010; (3) Use of hydro energetic potential of streams from the aspects of nature conservation on the example of north Slovakia; (4) Ecological aspects of the hydro power industry and possible means to improve ecological conditions of water reservoirs; (5) Preparation and realization of HPP Zilina; (6) Freudenau HPP. ecological measures and groundwater management; (7) Present state of hydro power development in Austria

  11. New avenues in cobalt-60 production at Ontario Hydro

    International Nuclear Information System (INIS)

    Mylvaganam, C.K.; Ronchka, R.A.

    1990-01-01

    Ontario Hydro produces cobalt-60 in the control rods of twelve power reactors. These reactors have a typical flux of 2 x 10 14 neutrons/cm 2 /s, making them efficient producers of cobalt-60. Current annual production is 45 million curies. Since the primary function of these reactors is the production of electricity, their flexibility to meet the needs of commercial cobalt production by the control rod route is limited. Ontario Hydro is therefore developing innovative production techniques, making use of the CANDU reactor's unique ability to be fuelled on-power. These techniques will enable production to better respond to the market's requirements for quantity and specific activity. As it is supplementary to control rod production, annual supply could potentially reach 165 million curies. (author)

  12. Demystification and localization in the adoption of micro-hydro technology : Insights from India

    NARCIS (Netherlands)

    Höffken, J.I.

    2016-01-01

    The phrase ‘small is beautiful’ holds true for the micro-hydro plants discussed in this article. Micro-hydro plants can convert the energy of falling water into electricity. In India, access to electricity cannot be taken for granted, especially in rural areas, which do not yet have grid extension

  13. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  14. Realisation of a small-scale hydro-power plant between two drinking water reservoirs in the municipality of Vira Gambarogno - Feasibility study; Realizzazione di una microcentrale idroelettrica sulla condotta di adduzione tra il serbatoio Monti di Fosano e il serbatoio Fosano. Programma piccole centrali idrauliche. Studio di fattibilita

    Energy Technology Data Exchange (ETDEWEB)

    Mutti, M.

    2009-02-15

    This report for the Swiss Federal Office of Energy (SFOE) takes a look at a project for the realisation of a small hydro-power plant on the drinking water supply in the municipality of Vira Gambarogno, southern Switzerland. The old conduit connecting two drinking water reservoirs has to be replaced. The elevation difference of 260 m is favorable to the installation of a turbine near the lower reservoir. The report presents details on the hydrological data and the dimensioning of the installation. Several variants are considered, which also include the possible reconstruction of the lower reservoir and/or an increased water flow rate from the springs. The electricity production expected is discussed, as is the economic viability of the project.

  15. Hydro-climatology

    DEFF Research Database (Denmark)

    The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal with under......The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal...... considered. The interdisciplinary approach reveals information and perspective that go beyond the study of cli ate and hydro gy alone...

  16. Canadian Power directory 2000

    International Nuclear Information System (INIS)

    1999-06-01

    The directory supplies information on power project developers (small hydro, gas cogeneration, small cogeneration, combined cycle, wood waste/biomass, municipal solid waste and other); consultants (lawyers, accountants, financial, building energy systems, other); service suppliers (engineering, project management, construction, environmental, insurance, surveyors, training, water treatment, other); financiers (equity, venture capital, institutional lenders, other institutions, joint venture, other); equipment suppliers (generators, turbines, boilers, piping, etc., pumps, engines, gensets, electrical, control systems, other); provincial utilities, regulators and agencies; independent energy associations; gas suppliers; power suppliers; resource groups and trade organizations; biomass fuels; district heating and cooling; energy service companies; wind energy; solar energy; and European and international listings

  17. Multi-Criteria GIS Methodology Focused on the Location of Optimal Places for Small Hydro Power Via Hydrological and Geostatistic Aplications; Metodologia SIG Multicriterio Enfocada a la Localizacion de Enclaves Optimos para Centrales de Minihidroelectricas mediante Aplicaciones Hidrologicas y Geoestadisticas

    Energy Technology Data Exchange (ETDEWEB)

    Paz, C de la

    2013-02-01

    The main objective of this research is the development of a location methodology for sitting optimization of small hydro power (SHP) centrals. In order of achieve this goal, a Multi-Criteria Evaluation (MCE) methodology implemented through the use of tools in a GIS environment: Spatial Analysis, Geostatistic Analysis, and Hydrology have been developed. This methodology includes two different models based on the same MCE process. The substantial difference of both models is in the input data and the tools applied to estimate the energy resource and the principal factor of the methodology (caudal or accumulated flow). The first model is generated from caudal data obtained in the study area (El Bierzo), and the second one from pluviometric data and Digital Terrain Model (DTM). Both models include viability maps with greater ability areas to locate SHP facilities. As an additional objective, the study allows contrasting the results of the two developed models to evaluate their similarity. (Author)

  18. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    Science.gov (United States)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  19. Enhancement of the Haemmerli hydro power installation in Lenzburg, Switzerland; Gemeinde Lenzburg (AG). Ausbau Kraftwerk Haemmerli - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-08-15

    This preliminary report for the Swiss Federal Office of Energy (SFOE) presents a project on the refurbishment of an old industrial small hydro installation on the Aabach stream in Lenzburg, Switzerland. The state of the existing installation is described as is the station's concession. The proposals for the renewal of this installation are described and discussed. The necessary building work and the installations required are examined. Investment costs, operating and maintenance costs and expected profitability are discussed. The report is completed with suggestions for further work.

  20. Upstream fish migration. Report of the hydro power panel of experts; Fischaufstieg. Bericht aus der Expertengruppe Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Roger, Sebastian [RWE Innogy GmbH, Essen (Germany). Asset Management Hydro National; Kaefer, Sabine [Verbund Hydro Power AG, Villach (Austria); Ulrich, Jochen [EDH Energiedienst Holding AG, Laufenburg (Switzerland). Oekologie und Werkdienst; Zemanek, Friedrich [evn naturkraft Erzeugungsgesellschaft m.b.H., Maria Enzersdorf (Austria)

    2013-10-01

    In recent years, ecological regulations and environmental demands have steadily increased on European, national, and on Federal State level. One key issue of Federal implementations of the European water framework directive is to achieve the environmental targets by establishing the passability for fish. In support of its member companies, VGB (TC 'Hydro Power Plants') set up a transnational expert group. This group was to analyse, compare, and evaluate different essential guidelines for fish passes and residual flows including the exchange of experience and the provision of practical examples. (orig.)

  1. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  2. In the spotlight: New hydro development in North America

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    1992 was a year of progress for many segments of the hydropower industry as developers worked to bring new projects on line. This industry overview features several of these projects and offers a preview of 1993 activity. The only operating privately owned hydroelectric project in Texas. The largest hydro plant in the province of Manitoba. The world's largest submersible hydroturbine-generator. These projects and others-completed and placed in service in 1992-can claim a special place in the history books. For each of the 31 hydro projects in North America that began operating in 1992, there's a unique story to tell. Each called upon the time, talent, commitment, ingenuity, and perseverance of those involved in their development. In aggregate, these projects contribute nearly 3,800 MW of clean, renewable electrical capacity that can be used efficiently and cost-effectively to help meet the power demands of customers in the US and Canada. Utilities, state agencies, municipalities, and independent power developers played roles in developing new hydro in 1992. We offer a sampling of their work to illustrate progress made in the past year

  3. Hidroenergia 2010: International congress on small hydropower. Conference report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This conference, held in 2010 in Lausanne, Switzerland, gathered together the main stakeholders of the small hydropower community to debate about topics affecting the development of the sector, to exchange experience and to present new advances in the technological area. The two-day conference was held in a total of nine sessions, a poster session and a workshop. The first session was dedicated to water management in the Alps and covered new regulations, administrative procedures and finance issues. Contributions included a review of the present situation and the development of common guidelines to meet the challenge of conflicting technical and environmental objectives, the facilitation of small hydropower in Switzerland and the institutional frameworks involved, recent trends in small hydro project financing and the growing roles of venture capital, private equity and changing market dynamics. Finally the prospects for small hydropower in Serbia were discussed. In two parallel sessions the following topics were looked at: The promotion of small hydropower in Switzerland using various sources of water and remuneration for the power produced, small hydro in the Canton of Vaud, Switzerland, the use of karst groundwater for the underground production of power were looked at as well as the analysis of hydraulic facilities for combining pumped storage hydropower systems and wind power in Austria. The final presentation took a look at the new 'La Tzintre' hydropower project. The parallel session dealt with technical innovations and engineering solutions with presentations on the development of small diagonal turbines, the adaptation of propeller turbines to higher specific needs and the problems encountered in doing so. The use of centrifugal pumps as turbines, including a review of technology and applications were also dealt with. Two further parallel sessions looked at EU-funded projects and sustainability issues. The Sustainable Energy Europe project was

  4. Economic impact of Hydro-Quebec's nuclear activities

    International Nuclear Information System (INIS)

    Emard, R.

    1994-01-01

    Gentilly 2 nuclear power plant has benefited the regions of Becancour and Trois Rivieres, with spin-off at the provincial level. Gentilly 2 is Hydro Quebec's only nuclear plant. Its 675 MW provide nearly 3% of Hydro Quebec's production. Over 664 permanent jobs were created, 70% of them highly specialized and multi-skilled. In 1993, out of C$99 spent, 57.3 were for wages, 16.3 for equipment and supplies (including fuel and heavy water), 18 for professional services provided by AECL and others, and the remainder included fees, permits, contract work, and miscellaneous. Gentilly 2 has fostered technological development and inventions which are used at other CANDU stations. 7 ills

  5. Short-term hydro-thermal scheduling using particle swarm optimization method

    International Nuclear Information System (INIS)

    Yu, Binghui; Yuan, Xiaohui; Wang, Jinwen

    2007-01-01

    The approaches based on different particle swarm optimization (PSO) techniques are applied to solve the short-term hydro-thermal scheduling problem. In the proposed methods, many constraints of the hydro-thermal system, such as power balance, water balance, reservoir volume limits and the operation limits of hydro and thermal plants, are considered. The feasibility of the proposed algorithm is demonstrated through an example system, and the results are compared with the results of a genetic algorithm and evolutionary programming approaches. The experimental results show that all the PSO algorithms have the ability to achieve nearly global solutions, but a local version of PSO with inertia weight appears to be the best amongst all the PSOs in terms of high quality solution

  6. HydroSoft coil versus HydroCoil for endovascular aneurysm occlusion study: A single center experience

    International Nuclear Information System (INIS)

    Guo Xinbin; Fan Yimu; Zhang Jianning

    2011-01-01

    Background and purpose: The HydroCoil Embolic System (HES) was developed to reduce recurrences of aneurysms relative to platinum coils. But the HydroCoil Embolic System was characterized with many limitations. The manufacturer had recognized the challenge and recently a new design of hydrogel-coated coil-HydroSoft has become available in the market as the new generation HydroCoil. We reported our initial experience using HydroSoft coil versus HydroCoil in our center. Methods: 75 aneurysms embolized primarily using HydroSoft Coils from July 2008 to May 2009 were compared with 66 volume- and shape-matched aneurysms treated with HydroCoils from March 2006 to August 2008. Outcome measures included length and number of coils used, contrast volume, and length of hospital stay. During embolization, a stable framework was first established with bare coils, and hydrogel-coated coils were used subsequently to increase the packing density. Follow-up angiographic results 6 months after treatment were evaluated among some of the patients. Results: Successful coil embolization was achieved in all patients. There were no differences in average total coil length used per aneurysm. There were no differences in length of hospital stay and packing density. HydroSoft coils were more suitable using as the finishing or final coil. HydroSoft coil decreased the procedure-related retreated rates, and aneurysm packing was finished with soft, flexible HydroSoft coil and decreased the neck remnant rates. Follow-up angiography in HydroSoft-treated patients at 6 months revealed aneurysm stability without significant residual neck. Conclusions: HydroSoft coil allowed us to deploy coated coils with good packing density. A slight expansion of these coils at the neck can be expected to reduce neck remnant and potentially inhibit recurrence.

  7. The future role of hydro-electricity in Sub-Saharan Africa

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1989-01-01

    Hydroelectric power currently supplies 56-93% of the electricity requirements of the different geographic areas of Sub-Saharan Africa and accounted for 73% of total requirements in 1980. The continent is richly endowed with hydro resources in all areas, with central Africa possessing the most abundant reserves. Existing installed hydro capacity is 13,500 MW and of the total technical resource of 290,000 MW, some 110,000 MW are estimated to constitute the potential that warrants investigation. The demand for electricity in the region is presently low and growing at 5-10%/y. It is projected to double from 47,000 GWh in 1980 to 110,000-170,000 GWh by the year 2000, and is likely to double again by 2020. Hydro reserves warranting investigation exceed the demand projected for the year 2000 by a ratio of over 3:1 and only 13 countries out of 36 have a ratio less than one. A large proportion of these reserves are estimated to be economic to develop relative to other means of power generation. The development of hydro resources should maintain the proportion of the demand met by hydro in the range of 60-75% well into the 21st century. The existing installed capacity is likely to be increased at the rate of 3,000-5,000 MW per decade to achieve this. Constraints on such increase include the large amounts of capital needed, environmental issues, the need to displace populations affected by flooding, and fluctuations in the oil price which make long-term planning uncertain. 5 refs., 1 fig., 11 tabs

  8. Environmental impact and benefit from hydro-energy: Bulgarian case

    International Nuclear Information System (INIS)

    Vesselinov, V.; Iotova, A.

    1996-01-01

    The present hydro energy system in Bulgaria has been constructed mainly in the period 1950-1965. The currently utilized hydro-power potential, only 33% of the estimated technical potential, includes 87 HPP operating in 1991. A complex assessment of the environmental impact of the hydro energy objects as well as a comparative analysis of all energy sources in Bulgaria is made in the framework of Bulgarian Case Study of the DECADES Inter-Agency Project. The main types of environmental impact related to HPP operation are presented in 7 specific categories: land requirements, changes in the landscape, hydrological changes, micro-climatic changes, geodynamic changes, risk from man-made activities; generation of new ecosystems. A technique of expertise in ball is proposed as a suitable quantitative approach for more precise assessment of impact on climate factors from different energy sources. 2 tabs., 5 refs

  9. Combined hydro-wind generation bids in a pool-based electricity market

    International Nuclear Information System (INIS)

    Angarita, Jorge L.; Usaola, Julio; Martinez-Crespo, Jorge

    2009-01-01

    Present regulatory trends are promoting the direct participation of wind energy in electricity markets. The final result of these markets sets the production scheduling for the operation time, including a power commitment from the wind generators. However, wind resources are uncertain, and the final power delivered usually differs from the initial power committed. This imbalance produces an overcost in the system, which must be paid by those who produce it, e.g., wind generators among others. As a result, wind farm revenue decreases, but it could increase by allowing wind farms to submit their bids to the markets together with a hydro generating unit, which may easily modify its production according to the expected imbalance. This paper presents a stochastic optimization technique that maximizes the joint profit of hydro and wind generators in a pool-based electricity market, taking into account the uncertainty of wind power prediction. (author)

  10. Hydropower projects financing through the public private partnership a future powered by hydro

    International Nuclear Information System (INIS)

    Oprea, Traian; Teleanu, Mihai; Dobrescu, Dan

    2004-01-01

    /////In the frame of economy type that characterized Romania before 1990, the infrastructure and public utilities development, from which the hydropower sector is integral part, was ensured from public funds. The power generation belongs to the public services, which make profits on an average or long terms, in the benefit of the society. The demand for these services is increasing because of both economical increasing and the private sector weight in economy increasing. But, the quality increasing of these services needs investments, that is access to the long-term loans. Romanian banks are not prepared for long-run loans, and the international agencies don't have sufficient investment funds for all necessary projects. One of the options is or, could be, the transfer of entirely responsibility for infrastructure in the private sector hands, but this is not feasible in many cases. For this reason the government can choose a middle way realizing a private public partnership for solving the problem of the investment funds. In a general manner, this scenario consists in the fact of appealing to the private sector to finance, build and operate, for a limited period, an infrastructure, power or tourism project, necessary to the development. The impact zone between the public sector interest and private sector interest defined the concept of 'private public partnership' in its multiple alternatives (BOT, BOO, BOOT, ROT, etc.). The first official mentioning of a project in private public development under the name of BOOT 'Build, Own, Operate, Transfer' has been used in Turkey, in 1984, by the prime-minister ever since, Turgut Ozal, as part of a huge development program through the privatization in the power sector, infrastructure and tourism. The 'private public partnership' concept was studied and promoted, beginning with '95 years by the European Community too, with the view of this financing model utilization to the infrastructure projects development. One of the most

  11. Planning and running of the hydro aggregates in the electric power system in the R. Macedonia

    International Nuclear Information System (INIS)

    Ilijovski, Igor

    2015-01-01

    The subject of the research in this master thesis is analysis of the main characteristics and control of the large Hydropower plants (HPPs) in the electric power system in R. Macedonia, which are subject to planning in the running tables. ELEM and MEPSO are using SCADA system for monitoring and control of the hydropower plants. The planning is a complex process where many aspects should be covered. With correct and optimal control of the hydro aggregates, depending on the hydrology, climate, elevation of the reservoirs and many other conditions, a better efficiency of the water resources usage may be obtained, which results in positive financial outcomes. (author)

  12. Report of the special prosecutor: BC Hydro 'Raiwind' project

    International Nuclear Information System (INIS)

    Fraser, P. D. K.

    1999-10-01

    A special prosecutor has been appointed by the British Columbia Government to assist the Royal Canadian Mounted Police (RCMP) in its investigation, and to render appropriate charging decisions in the matter of the circumstances surrounding the creation of IPC International Power Corporation (IPC) owned by a Mr. John N. Laxton, former Chairman of BC Hydro and his two children, and its joint venture with BC Hydro for the development of an international power project in Pakistan known as the Raiwind project. Of particular concerns were the conflict of interest breached by Mr. Laxton in loaning a substantial sum of money to a principal member of the Pakistani side of the joint venture, and by the former President and CEO of BC Hydro, Mr. John Sheehan, by his purchase of shares of IPC by a company owned by members of his family. In 1996 Mr. Sheehan's employment as President and CEO was terminated by BC Hydro for breaching internal conflict of interest guidelines and for failing to get approval from BC Hydro for the acquisition of IPC shares. Subsequently, Mr. Sheehan commenced an action against BC Hydro for wrongful dismissal, a claim which was upheld by the Supreme Court of British Columbia. The focus of the special prosecutor's criminal investigation ultimately became the conduct of Mr. Laxton and whether a charge could or should be laid under Section 122 of the Criminal Code. The outcome of his investigation, which is discussed in this report, was that there was no substantial likelihood of conviction under the breach or trust provisions of Section 122 with respect to the indirect purchases by Mr. Laxton of shares in IPC. Nor was there any reason to believe that a personal loan made in high-risk circumstances could be a benefit or advantage to the lender. Furthermore, the loan cannot be causally related to any loss or financial harm to BC Hydro. In fact, it could be argued that Mr. Laxton's private decision to make the loan was of real assistance in ensuring that the

  13. Small and medium power reactors 1987

    International Nuclear Information System (INIS)

    1987-12-01

    This TECDOC follows the publication of TECDOC-347 Small and Medium Power Reactors Project Initiation Study - Phase I published in 1985 and TECDOC-376 Small and Medium Power Reactors 1985 published in 1986. It is mainly intended for decision makers in Developing Member States interested in embarking on a nuclear power programme. It consists of two parts: 1) Guidelines for the Introduction of Small and Medium Power Reactors in Developing Countries. These Guidelines were established during the Advisory Group Meeting held in Vienna from 11 to 15 May 1987. Their purpose is to review key aspects relating to the introduction of Small and Medium Power Reactors in developing countries; 2) Up-dated Information on SMPR Concepts Contributed by Supplier Industries. According to the recommendations of the Second Technical Committee Meeting on SMPRs held in Vienna in March 1985, this part contains the up-dated information formerly published in Annex I of the above mentioned TECDOC-347. Figs

  14. Small and medium power reactors 1987

    Science.gov (United States)

    1987-12-01

    This TECDOC follows the publication of TECDOC-347: Small and Medium Power Reactors (SMPR) Project Initiation Study, Phase 1, published in 1985 and TECDOC-376: Small and Medium Power Reactors 1985 published in 1986. It is mainly intended for decision makers in Developing Member States interested in embarking on a nuclear power program. It consists of two parts: (1) guidelines for the introduction of small and medium power reactors in developing countries. These Guidelines were established during the Advisory Group Meeting held in Vienna from 11 to 15 May 1987. Their purpose is to review key aspects relating to the introduction of small and medium power reactors in developing countries; (2) up-dated information on SMPR Concepts Contributed by Supplier Industries. According to the recommendations of the Second Technical Committee Meeting on SMPRs held in Vienna in March 1985, this part contains the up-dated information formerly published in Annex 1 of the above mentioned TECDOC-347.

  15. Recent experience of IFFM PAS in the design process of lowhead propeller hydraulic turbines for Small Hydro

    International Nuclear Information System (INIS)

    Kaniecki, M; Krzemianowski, Z

    2010-01-01

    The paper contains the short description of the design process of the axial flow turbines for Small Hydro. The crucial elements of the process are: ARDES programme for 1D inverse problem (containing the statistic information of the well performed hydraulic units, applying the lifting aerofoil theory); determination of universal hill diagram and optimization of the runner blades geometry by utilization of the 3D CFD codes. As the result of design process with utilization of both design steps, the generated runner blades geometry (1D inverse problem) and some computational results of 3D CFD solver have been presented. As the conclusion some crucial remarks of the designed process have been brought forward.

  16. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  17. A critical view on the eco-friendliness of small hydroelectric installations.

    Science.gov (United States)

    Premalatha, M; Tabassum-Abbasi; Abbasi, Tasneem; Abbasi, S A

    2014-05-15

    Renewable energy sources are widely perceived as 'clean', 'green', and 'inexhaustible'. In recent years the spectre of global warming and ocean acidification, which has been primarily attributed to fossil fuel burning, has brought renewable energy at the forefront of most climate change mitigation strategies. There is strong advocacy for large-scale substitution of conventional energy sources with the renewables on the premise that such a move would substantially reduce environmental degradation and global warming. These sentiments are being echoed by scientists and policy makers as well as environmental activists all over the world. 'Small hydro', which generally represents hydroelectric power projects of capacities 25 MW or lower, is one of the renewable energy options which is believed to be clean and sustainable even as its bigger version, large hydro, is known to cause several strongly adverse environmental impacts. This paper brings out that the prevailing perception of 'eco-friendliness' of small hydro is mainly due to the fact that it has only been used to a very small extent so far. But once it is deployed at a scale comparable to fossil fuel use, the resulting impacts would be quite substantially adverse. The purpose is not to denegrade small hydro, less so to advocate use of fossil fuels. It, rather, is to bring home the point that a much more realistic and elaborate assessment of the likely direct as well as indirect impacts of extensive utilization of this energy source than has been done hitherto is necessary. Copyright © 2013 Elsevier B.V. All rights reserved.

  18. Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China

    Directory of Open Access Journals (Sweden)

    Xinshuo Zhang

    2018-04-01

    Full Text Available How to effectively use clean renewable energy to improve the capacity of the power grid to absorb new energy and optimize the power grid structure has become one of China’s current issues. The Yalong River Wind-PV-Hydro complementary clean energy base was chosen as the research object from which to analyze the output complementarity principle and characteristics of wind farms, photovoltaic power plants, and hydropower stations. Then, an optimization scheduling model was established with the objective of minimizing the amount of abandoned wind and photovoltaic power and maximizing the stored energy in cascade hydropower stations. A Progress Optimality Algorithm (POA was used for the short-term optimal operation of Wind-PV-Hydro combinations. The results show that use of cascaded hydropower storage capacity can compensate for large-scale wind power and photovoltaic power, provide a relatively sustained and stable power supply for the grid. Wind-PV-Hydro complementary operation not only promotes wind power and photovoltaic power consumption but also improves the efficiency of using the original transmission channel of hydropower. This is of great significance to many developing countries in formatting a new green approach, realizing low-carbon power dispatch and trade and promoting regional economic development.

  19. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Science.gov (United States)

    2011-10-31

    ...; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp... & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090...

  20. Mixed-integer nonlinear approach for the optimal scheduling of a head-dependent hydro chain

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-08-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to earlier studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas. Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper. Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement. (author)

  1. Norwegian hydropower a valuable peak power source

    Energy Technology Data Exchange (ETDEWEB)

    Brekke, Hermod

    2010-07-01

    Full text: The paper gives a historical technical review of the development and installation of approximately 20 000 MW of hydraulic turbines in Norway after World War II. The non polluting production of electricity was consumed for lightening and heating for civil consume and the growing electric furnace industry in Norway in addition to export in rainy years. The paper is mainly based on the authors experience in the design of large turbines, and control systems for operation of Francis Turbines and Reversible Pump Turbines for high and medium heads and Pelton turbines for high heads. During the last 15 years the development of small hydro power plants has also given an increasing contribution to the power production. A brief discussion will be given on the choice of equipment for small hydro production with a very small winter production and overload during the summer. The possibility of operation of a small hydropower plants connected to an isolated grid will also briefly be presented. In addition to the general design of turbines and control systems for large hydro plants, a detailed description will be given of the stability analysis for the governing system which was developed for the large high head plants with long high pressure tunnels systems. A discussion will be included on the introduction of the air cushioned surge chambers for fast stable operation of power plants with long tunnels, connected to isolated grids. Also the principle of stabilizing unstable turbine governing system by means of pressure feed back systems, will be presented and discussed. A description of such system developed in 1992, will be given proving that stability could be obtained in a system with long conduits connected to the turbines. However, the 'governing speed' needed for isolated operation could not be fulfilled without a fast by pass pressure relieve system for Francis turbines, which was not installed in the case for the analysis. Finally a discussion will be

  2. Electricity production by hydro power plants: possibilities of forecasting

    International Nuclear Information System (INIS)

    Barkans, J.; Zicmane, I.

    2004-01-01

    Hydro energy accounts for 17% of global electricity production and is the most important source of renewable energies actively used today, being at the same time the least influential ecologically. Its only disadvantages is that this kind of energy is difficult to forecast, which hinders not only the planning of tariffs, year budgets and investments, but also contractual negotiations in particular month. The paper shows that the forecasting of hydro energy production can be linked to certain natural processes, namely, to the cyclic behaviour observed for water flows of the world's rivers. The authors propose a method according to which the forecasting procedure is performed using the data of observations as signals applied to special digital filters transforming the water flow process into integral and differential forms, which after appropriate treatment are expected again in usual water flow units. For this purpose the water flow integral function is to be divided, by means of spectral analysis, into 'low-frequency' (with a semi-period of 44 years) and 'high-frequency' (4-6 year semi-periods) components, which are of different origin. Each of them should be forecasted separately, with the following summation of the results. In the research it is shown that the cyclic fluctuations of world rivers' water flows are directly associated with variations in the Solar activity. (authors)

  3. The Atlin Hydro Project : generation for generations

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, S. [Atlin Tlingit Development Corp., Atlin, BC (Canada)

    2010-07-01

    This presentation documented the step-by-step process by which the Atlin Hydro Project was developed. The Taku River Tlingit First Nation undertook the Atlin project as part of its vision for responsible resource management, sustainable economic development, and cultural revival. The Atlin Community Energy Plan involved an assessment of electricity demand, a 20-year demand projection, energy efficiency recommendations, and an assessment of power supply options such as wind towers, connection to the Yukon power grid, and hydro. The potential impact on fisheries, hydrology, wildlife habitat, roads and bridges, navigable waters and forests, existing rights, and First Nation archaeology were assessed, along with other factors such as hazards and flood control. A hydrology assessment of the Surprise-Pine Drainage Basin was undertaken, and stream-flow measurements were taken near the intake location on Pine Creek. The project comprises a discharge control structure and a fish ladder; an intake and weir on Pine Creek; a penstock pipeline from intake to powerhouse; a powerhouse with a 2.1 MW Pelton turbine generator and a switch yard; and a power line from the powerhouse to the interconnection with the existing grid. The impacts on fisheries, wildlife, and human movement are expected to be minimal. 28 figs., 3 tabs.

  4. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  5. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  6. The Modeling and Simulation of Thermal Analysis at Hydro Generator Stator Winding Insulation

    Directory of Open Access Journals (Sweden)

    Mihaela Raduca

    2006-10-01

    Full Text Available This paper presents the modelling and simulation of thermal analysis at hydro generator stator winding. The winding stator is supplied at high voltage of 11 kV for high power hydro generator. To present the thermal analysis for stator winding is presented at supply of coil by 11 kV, when coil is heat and thermal transfer in insulation at ambient temperature.

  7. Feasibility study and economic analysis of pumped hydro storage and battery storage for a renewable energy powered island

    International Nuclear Information System (INIS)

    Ma, Tao; Yang, Hongxing; Lu, Lin

    2014-01-01

    Highlights: • Batteries and pumped hydro storage schemes are examined. • Sizing procedure for each option is investigated in detail. • The two schemes are compared in terms of life cycle cost and technical viability. • Sensitivity analyses are conducted on five key input parameters. - Abstract: This study examined and compared two energy storage technologies, i.e. batteries and pumped hydro storage (PHS), for the renewable energy powered microgrid power supply system on a remote island in Hong Kong. The problems of energy storage for off-grid renewable energy were analyzed. The sizing methods and economic models were developed, and finally applied in the real project (case study). The results provide the most suitable energy storage scheme for local decision-makers. The two storage schemes were further divided into 4 options. Accordingly, the life-cycle costs (LCC), levelized costs for the renewable energy storage system (LCRES) and the LCC ratios between all options were calculated and compared. It was found that the employment of conventional battery (Option 2) had a higher LCC value than the advanced deep cycle battery (Option 1), indicating that using deep cycle batteries is more suitable for a standalone renewable power supply system. The pumped storage combined with battery bank option (Option 3) had only 55% LCC of that of Option 1, making this combined option more cost-competitive than the sole battery option. The economic benefit of pumped storage is even more significant in the case of purely pumped storage with a hydraulic controller (Option 4), with the lowest LCC among all options at 29–48% of Option 1. Sensitivity analysis demonstrates that PHS is even more cost competitive by controlling some adjustments such as increasing energy storage capacity and days of autonomy. Therefore, the renewable energy system coupled with pumped storage presents technically feasible opportunities and practical potential for continuous power supply in remote

  8. Rainfall prediction using fuzzy inference system for preliminary micro-hydro power plant planning

    Science.gov (United States)

    Suprapty, B.; Malani, R.; Minardi, J.

    2018-04-01

    East Kalimantan is a very rich area with water sources, in the form of river streams that branch to the remote areas. The conditions of natural potency like this become alternative solution for area that has not been reached by the availability of electric energy from State Electricity Company. The river water in selected location (catchment area) which is channelled to the canal, pipeline or penstock can be used to drive the waterwheel or turbine. The amount of power obtained depends on the volume/water discharge and headwater (the effective height between the reservoir and the turbine). The water discharge is strongly influenced by the amount of rainfall. Rainfall is the amount of water falling on the flat surface for a certain period measured, in units of mm3, above the horizontal surface in the absence of evaporation, run-off and infiltration. In this study, the prediction of rainfall is done in the area of East Kalimantan which has 13 watersheds which, in principle, have the potential for the construction of Micro Hydro Power Plant. Rainfall time series data is modelled by using AR (Auto Regressive) Model based on FIS (Fuzzy Inference System). The FIS structure of the training results is then used to predict the next two years rainfall.

  9. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Mariano, S.J.P.S. [Beira Interior Univ., Covilha (Portugal). Dept. of Electromechanical Engineering; Mendes, V.M.F. [Superior Engineering Inst. of Lisbon, Lisbon (Portugal). Dept. of Electrical Engineering and Automation; Ferreira, L.A.F.M. [Technical Univ. of Lisbon, Superior Technical Inst., Lisbon (Portugal). Dept. of Electrical Engineering and Computers

    2008-07-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs.

  10. Scheduling of head-sensitive cascaded hydro systems : a comparison based on numerical simulation results

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2008-01-01

    The electric power sector in Portugal and Spain has shifted from a traditional monopoly to a deregulated, competitive energy market. As such, hydroelectric facilities face the optimal challenge of how to make a profit by managing water resources without compromising future potential profit. As such, hydro scheduling is a key activity for hydroelectric power utilities because of its significant economic impact. It involves the optimal management of water inflows and storage in reservoirs. This paper considered the problem of short-term hydro scheduling, concerning head-sensitive cascaded reservoirs, and the algorithmic aspects of its solution. The authors proposed and compared optimization methods based on dynamic programming, and linear and nonlinear network programming. The comparison revealed a negligible extra computational effort in a realistic cascaded hydro system where the head depended on the stored water volume. 17 refs., 3 tabs., 7 figs

  11. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  12. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  13. Calibration of thermoluminescence skin dosemeter response to beta emitters found in Ontario Hydro nuclear power stations

    International Nuclear Information System (INIS)

    Walsh, M.L.; Agnew, D.A.; Donnelly, K.E.

    1984-01-01

    The response of the Ontario Hydro Thermoluminescence Dosimetry System to beta radiation in nuclear power station environments was evaluated. Synthetic beta spectra were constructed, based on activity samples from heat transport systems and fuelling machine contamination smears at nuclear power stations. Using these spectra and dosemeter energy response functions, an overall response factor for the skin dosemeter relative to skin dose at 7 mg.cm -2 was calculated. This calculation was done assuming three specific geometries: (1) an infinite uniformly contaminated plane source at a distance of 33 cm (50 mg.cm -2 total shielding) from the receptor; (2) an infinite cloud surrounding the receptor; (3) a point source at 33 cm. Based on these calculations, a conservative response factor of 0.7 has been chosen. This provides an equation for skin dose assignment, i.e. Skin Dose = 1.4 x Skin Dosemeter Reading when the skin dosemeter is directly calibrated in mGy(gamma). (author)

  14. Global warming: a changing climate for hydro

    International Nuclear Information System (INIS)

    Oud, E.

    1993-01-01

    This paper quantifies the benefits attributable to hydroelectric power generation in preventing carbon dioxide emissions from the use of thermal plants. It proposes that utilities and funding agencies consider the societal costs associated with the emission of CO 2 in power system planning. It also suggests that the industrialized countries should consider changing their funding practice and give more appropriate credits for the construction of hydro plants in developing countries, with a view to avoiding the construction and operation of fossil fuelled powerplants. (author)

  15. Experimental and numerical investigation of hydro power generator ventilation

    Science.gov (United States)

    Jamshidi, H.; Nilsson, H.; Chernoray, V.

    2014-03-01

    Improvements in ventilation and cooling offer means to run hydro power generators at higher power output and at varying operating conditions. The electromagnetic, frictional and windage losses generate heat. The heat is removed by an air flow that is driven by fans and/or the rotor itself. The air flow goes through ventilation channels in the stator, to limit the electrical insulation temperatures. The temperature should be kept limited and uniform in both time and space, avoiding thermal stresses and hot-spots. For that purpose it is important that the flow of cooling air is distributed uniformly, and that flow separation and recirculation are minimized. Improvements of the air flow properties also lead to an improvement of the overall efficiency of the machine. A significant part of the windage losses occurs at the entrance of the stator ventilation channels, where the air flow turns abruptly from tangential to radial. The present work focuses exclusively on the air flow inside a generator model, and in particular on the flow inside the stator channels. The generator model design of the present work is based on a real generator that was previously studied. The model is manufactured taking into consideration the needs of both the experimental and numerical methodologies. Computational Fluid Dynamics (CFD) results have been used in the process of designing the experimental setup. The rotor and stator are manufactured using rapid-prototyping and plexi-glass, yielding a high geometrical accuracy, and optical experimental access. A special inlet section is designed for accurate air flow rate and inlet velocity profile measurements. The experimental measurements include Particle Image Velocimetry (PIV) and total pressure measurements inside the generator. The CFD simulations are performed based on the OpenFOAM CFD toolbox, and the steady-state frozen rotor approach. Specific studies are performed, on the effect of adding "pick-up" to spacers, and the effects of the

  16. Multiple objective optimization of hydro-thermal systems using Ritz's method

    Directory of Open Access Journals (Sweden)

    Arnáu L. Bayón

    1999-01-01

    Full Text Available This paper examines the applicability of the Ritz method to multi-objective optimization of hydro-thermal systems. The algorithm proposed is aimed to minimize an objective functional that incorporates the cost of energy losses, the conventional fuel cost and the production of atmospheric emissions such as NO x and SO 2 caused by the operation of fossil-fueled thermal generation. The formulation includes a general layout of hydro-plants that may form multi-chains of reservoir network. Time-delays are included and the electric network is considered by using the active power balance equation. The volume of water discharge for each hydro-plant is a given constant amount from the optimization interval. The generic minimization algorithm, which is not difficult to construct on the basis of the Ritz method, has certain advantages in comparison with the conventional methods.

  17. Short-term hydro-thermal-wind complementary scheduling considering uncertainty of wind power using an enhanced multi-objective bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Zhou, Jianzhong; Lu, Peng; Li, Yuanzheng; Wang, Chao; Yuan, Liu; Mo, Li

    2016-01-01

    Highlights: • HTWCS system is established while considering uncertainty of wind power. • An enhanced multi-objective bee colony optimization algorithm is proposed. • Some heuristic repairing strategies are designed to handle various constraints. • HTWCS problem with economic/environment objectives is solved by EMOBCO. - Abstract: This paper presents a short-term economic/environmental hydro-thermal-wind complementary scheduling (HTWCS) system considering uncertainty of wind power, as well as various complicated non-linear constraints. HTWCS system is formulated as a multi-objective optimization problem to optimize conflictive objectives, i.e., economic and environmental criteria. Then an enhanced multi-objective bee colony optimization algorithm (EMOBCO) is proposed to solve this problem, which adopts Elite archive set, adaptive mutation/selection mechanism and local searching strategy to improve global searching ability of standard bee colony optimization (BCO). Especially, a novel constraints-repairing strategy with compressing decision space and a violation-adjustment method are used to handle various hydraulic and electric constraints. Finally, a daily scheduling simulation case of hydro-thermal-wind system is conducted to verify feasibility and effectiveness of the proposed EMOBCO in solving HTWCS problem. The simulation results indicate that the proposed EMOBCO can provide lower economic cost and smaller pollutant emission than other method established recently while considering various complex constraints in HTWCS problem.

  18. Study of cavitation in hydro turbines. A review

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Pardeep; Saini, R.P. [Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee 247667 (India)

    2010-01-15

    Reaction turbines basically Francis turbines and propeller/Kaplan turbines are suitable for medium and low head hydropower sites. The management of the small hydropower plants is an important factor, for achieving higher efficiency of hydro turbines with time. Turbines show declined performance after few years of operation, as they get severely damaged due to various reasons. One of the important reasons is erosive wear of the turbines due to cavitation. Reaction turbines, however are more prone to cavitation especially Francis turbines where a zone in the operating range is seriously affected by cavitation and considered as forbidden zone. Cavitation is a phenomenon which manifests itself in the pitting of the metallic surfaces of turbine parts because of the formation of cavities. In the present paper, studies undertaken in this field by several investigators have been discussed extensively. Based on literature survey various aspects related to cavitation in hydro turbines, different causes for the declined performance and efficiency of the hydro turbines and suitable remedial measures suggested by various investigators have been discussed. (author)

  19. Ontario Hydro at the millennium : has monopoly's moment passed?

    International Nuclear Information System (INIS)

    Daniels, R.J.

    1996-01-01

    This volume is a collection of 10 papers presented at a conference in which the challenges of restructuring the electric power industry in Ontario were discussed. Legal experts, policy makers, economists and stakeholders in the industry presented their views regarding the future of the industry in Ontario. The implications of privatization were discussed. There was general agreement on the need for some industry de-integration and privatization. However, agreement on the exact nature of the approach to take was more divided. For example, opinion was divided on what the logical endpoint of industry restructuring should be i.e. wholesale or retail competition. Also contentious was the question of what portion of Hydro's generating assets should be sold off to private enterprise if Hydro's generation and transmission assets are unbundled. Opinions were also divided about the environmental consequences of nuclear energy. Significant differences of opinion were evident concerning the privatization of Ontario Hydro's nuclear assets. refs., tabs., figs

  20. Ontario Hydro Research Division, 1980

    International Nuclear Information System (INIS)

    The work of the Research Division of Ontario Hydro provides technical and scientific support for the engineering and operation of a power system that includes hydraulic, fossil-fired, and nuclear generation. It also relates to the transmission and distribution of electricity and to the need to help customers use electricity with safety and economy. Among the examples of projects given are qualification of CANDU heat transport system components, pressure tube replacement, steam generator integrity, testing for earthquake resistance, and radioactive waste disposal

  1. Energy generated for you : Newfoundland and Labrador Hydro 2003 annual report

    International Nuclear Information System (INIS)

    2004-01-01

    This report provides a consolidated review of the operations of Newfoundland and Labrador Hydro (Hydro) with focus on energy production, energy sales, and environmental commitment. The utility, a Crown Corporation owned by the Province of Newfoundland and Labrador, generates, transmits and distributes electricity to utility, industrial and residential customers. It is the parent company of the Hydro Group of Companies which includes Newfoundland and Labrador Hydro, Churchill Falls Corp. Ltd., Lower Churchill Development Corp. Ltd., Gull Island Power Co. Ltd., and Twin Falls Power Co. Ltd.. The installed generating capacity of the Hydro Group of Companies is the fourth largest in Canada. The generating assets include 10 operating hydroelectric plants, 1 oil-fired plant, 4 gas turbines, 28 diesel plants, and the Churchill Falls Hydroelectric generating station. The utility also maintains 4,800 km of transmission lines and more than 3,600 km of lower voltage distribution lines. The utility is isolated from the North American grid. Energy sales in 2003 were one per cent above 2002. The Holyrood thermal generating station had a gross production of 2061 GWh in 2003, an 18 per cent reduction from 2002. The 40 MW Granite Canal Hydroelectric generating station was completed in 2003. The utility also purchased electricity from Corner Brook Pulp and Paper and the Exploits River Partnership in order to meet the demand for capacity and energy on the island. The Hydro Group's net income decreased by 24 per cent in 2003, while there was a 3 per cent increase in revenue. Earnings are expected to be higher in 2004 due to a projected increase in rates. This annual report presented the company's financial performance, executive changes, rural rate inquiry, and reorganization. Financial statements included a thorough review and analysis of financial transactions, the auditor's report, and the customary notes to the consolidated financial statement including balance sheets, assets

  2. The Hetex small-scale hydro plant

    International Nuclear Information System (INIS)

    Guentert, P.; Boller, F.; Wanner, A.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the 400 kW small hydroelectric power plant (SHP) installed on the Aabach stream in Niederlenz, Switzerland. With a maximum water-flow of 4.5 m 3 /s, the turbine can produce about 1.5 GWh of electricity per year. In spring 2005, bearing damage necessitated substantial renovation to the turbine and the generator. This study examines the state of the rest of the plant noted during maintenance work. It also focuses on the feeding of the electricity produced into the grid, the effects of increased residual water-flow, the option of using the Hallwilersee lake as a buffer, upstream flood evacuation and the possibility of green electricity certification. The calculation of the amount of water available is discussed. Due to inconsistent data, a corrected flow-duration curve was used. For the local river authorities, the through passage for fish from the Aare river up to the Hallwilersee has a high priority. The Hetex SHP weir is one of nine barriers to a direct connection. The planning of a fish-pass to be built in 2006 is discussed

  3. Resettlement associated with hydro projects in China

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The flow rates of Chinese rivers are subject to major seasonal fluctuations, and as a result large reservoirs have to be constructed for flood control, irrigation, and power generation. As most of the river valleys are densely populated, the relocation and resettlement of people from the reservoir areas are major but unavoidable problems to be addressed in building hydro projects in China. (author)

  4. The Role of Nuclear Power in Pakistan

    International Nuclear Information System (INIS)

    Parvez, A.; Iqleem, J.

    2002-01-01

    Although the energy and electricity demand in Pakistan have been steadily growing, the per capita electricity consumption at around 300 kWh is still rather small when compared to most countries. The current installed capacity is around 17,700 MW with fossil fuels providing nearly two-third of this capacity, hydro a little less than one-third and nuclear around 2.5%. A major fraction of the oil used in Pakistan has to be imported while hydro remains subject to seasonal changes. The next 20 year projections point to a serious electrical energy generation shortfall even when the contribution from indigenous gas, coal, and hydro is increased optimistically. It is estimated that a deficit of some 3000-5000 MW may exist which will have to be met from an alternate energy resource like nuclear. Two small nuclear power plants (KANUPP, a 137 MWe CANDU which has been operating safely for nearly three decades, and CHASNUPP, the newly built 325 MWe PWR supplied by China) are already on-line. KANUPP has essentially been operated without any vendor support thanks to a systematic self-reliance program. The experience gained through procuring, operating and maintaining these power plants, coupled with the need to meet the projected electrical energy shortfall which cannot be met through conventional resources, makes nuclear a very viable option, and Pakistan an ideal case to study the current and future role of nuclear in a developing country with medium sized grid. This paper will describe an overview of the experience of development of nuclear power in Pakistan. Future strategies, which involve negotiating a case for nuclear with the energy policy makers, interacting with the vendor on matters of obtaining new plants, and increasing self-reliance in the area of nuclear power technology, will also be discussed. (author)

  5. Experimental Hydro-Mechanical Characterization of Full Load Pressure Surge in Francis Turbines

    Science.gov (United States)

    Müller, A.; Favrel, A.; Landry, C.; Yamamoto, K.; Avellan, F.

    2017-04-01

    Full load pressure surge limits the operating range of hydro-electric generating units by causing significant power output swings and by compromising the safety of the plant. It appears during the off-design operation of hydraulic machines, which is increasingly required to regulate the broad integration of volatile renewable energy sources into the existing power network. The underlying causes and governing physical mechanisms of this instability were investigated in the frame of a large European research project and this paper documents the main findings from two experimental campaigns on a reduced scale model of a Francis turbine. The multi-phase flow in the draft tube is characterized by Particle Image Velocimetry, Laser Doppler Velocimetry and high-speed visualizations, along with synchronized measurements of the relevant hydro-mechanical quantities. The final result is a comprehensive overview of how the unsteady draft tube flow and the mechanical torque on the runner shaft behave during one mean period of the pressure oscillation, thus defining the unstable fluid-structure interaction responsible for the power swings. A discussion of the root cause is initiated, based on the state of the art. Finally, the latest results will enable a validation of recent RANS flow simulations used for determining the key parameters of hydro-acoustic stability models.

  6. Hydro Ottawa Holding Inc. 2004 annual report : 3 ways to make 1 powerful connection

    International Nuclear Information System (INIS)

    2005-01-01

    An overview of the municipally owned Hydro Ottawa Holding Inc. was presented in this annual report. In 2004, the utility moved out of a deficit position for the first time in its 4 year history. Consolidated net earnings from continuing and discontinued operations increased to $19.7 million from $2.6 million. The increase was due mainly to decreases in operating, maintenance and administrative costs, as well as to the recovery of the cost of regulatory assets and the gain on the disposal of discontinued operations. As a result, the Corporation's deficit of $16.9 million became retained earnings of $2.8 million. Financial highlights were presented, as well as a comparison of distributors' charges with other utilities. It was noted that transparency and accountability were improved with more regular reporting to its shareholder, the City of Ottawa. In late 2004, City Council approved Hydro Ottawa Holding's 5 year consolidated financial plan which recommended that the City invest $37.8 million back into the Corporation and receive payment of the balance. The payback of the City's loan was financed through the Corporation's placement, in 2005, of $200 million in bonds. New programs included a trash-to-electricity contract, a bounty on energy-wasting fridges, and Telecom Ottawa's Data Backup and Recovery Service. Hydro Ottawa Holding Inc. is an amalgamation of 5 Ottawa-area utilities, and now provides leadership to 3 subsidiaries: Hydro Ottawa Ltd., Energy Ottawa Inc., and Telecom Ottawa Holding Inc.. Financial highlights of the 3 subsidiaries were also provided. tabs., figs

  7. An ecological solution in power development strategy: hydroelectric Power

    International Nuclear Information System (INIS)

    Ionescu, S.; Teodorescu, D.

    1994-01-01

    One of the fundamental criteria in establishing the power development strategy is represented by the environmental protection. Besides increasing the power efficiency for users, the hydro power stands for a handy alternative to generate thermal power. Comparatively, if hydro power is properly planed and developed, it could allow conservation of fossil fuel resources (as it makes use of a renewable resources) and avoids air and water pollution and in addition would lead to certain positive effects upon the natural and anthropic environment (flood routing, optimizes the power supply-demand relationship, and so on). By making use of the data available in the international specific literature and the information on the power development strategy in Romania the effects incurred by hydro power are both qualitatively and quantitatively emphasized as compared to alternative power generation by fossil fuel combustion. The proposal is made to adopt certain law regulations as well as a methodology to evaluate the general efficiency of various types of power generating devices suiting the particular conditions of Romania and taking into account the social cost as well as environmental effects. Hence a power development strategy could be undertaking at the national level provided it meets the requirements of both power system and environment protection. (Author)

  8. Optimising India's small hydro resources

    International Nuclear Information System (INIS)

    Kumar, A.

    1995-01-01

    A brief history is given of an initiation to develop small scale hydropower projects in the Himalayas. The experience of the Indian project managers in utilising international funds from the Global Environment Facility could serve as a model for other small remote communities in the rest of the world. Lessons learned are reported. (UK)

  9. Electronic Control Of Small Hydro-Generators Part 1

    International Nuclear Information System (INIS)

    Perez G, Alvaro; Romero A, Carlos E.

    1993-01-01

    This work is the beginning of several applied itineraries, to the government of micro-centrals, mainly directed to the control of electric variables of the generator with the desire of obtaining a system of electric generation to drop it climbs, economic, reliable and with great sense of use of the hydraulic resources guided to poor communities, isolated of the system of national interconnection. In all hydroelectric power station without caring their capacity is fundamental to govern the speed of the system turbine generator, to guarantee a constant frequency of 60 Hz, the stability of this parameter is a measure of the quality of the energy given to the user. The used regulation method is the mechanical governor, its action it is to control the flow of water that it enters to the turbine. For small generation power stations (smaller to 200 Kw), the mechanical governor's cost is comparable to the total cost of the plant, then it is economic to use an electronic load control. The project develops the load control whose function is to add external electric load to the generator to maintain the constant nominal active power and similar to the power nominal mechanics surrendered by the turbine. The microprocessor 8088 dedicated to the control of the system by the complexity of the process, the quantity of variables and the precision in the answer of the system is used. To carry out the investigation project a simulation program it was designed in computer that allows to know the answer of the load control ahead of time for different conditions of the user's operation. These results were answered with the obtained experimental values of the final tests of the team, throwing very near values to those calculated

  10. PowerPal: power up your creek

    International Nuclear Information System (INIS)

    2006-01-01

    PowerPal micro-hydro equipment was developed in Vietnam by Asian Phoenix Resources Ltd. of Victoria, BC; a company who aims to help disadvantaged people in less developed countries by making renewable energy devices available to them. The idea for the micro-hydro system was conceived after mineral exploration parties in Vietnam noted that large numbers of poor quality propeller turbines were being used to supply AC power to individual homes. A plan was developed to improve the quality and reliability of low head turbines with better castings, magnets, superior bearings and electronic load controllers. Funding for the program was initially difficult to obtain. However, PowerPal micro-hydro equipment eventually came to the attention of the World Bank as well as other government and non-governmental organizations. Financing for the purchase and installation of larger numbers of units has now been achieved, and missionary groups in various parts of the world have ordered units. European markets have also opened up, and distributors of the micro-hydro equipment have been appointed in various countries. Sales are now strong in Central America, South America, the Caribbean, Australasia, Oceania, Africa and Europe. It was concluded that the surge of interest has coincided with a steep upturn in oil prices. 8 figs

  11. Operational and structural measures to reduce hydro-peaking impact on fish larvae

    International Nuclear Information System (INIS)

    Kopecki, Ianina; Schneider, Matthias

    2016-01-01

    Eco-hydraulic investigations studying the effects of hydro-peaking on river biota are gaining in importance. Negative effects of rapid flow fluctuations due to hydro power production are well documented by many studies, with the larvae and juvenile fish identified among the mostly affected life stages. Therefore, elaboration of efficient hydro-peaking mitigation strategies is an important issue for energy companies as well as for water body administrations responsible for the fulfilment of WFD requirements. The present case study strives for practical solutions allowing to minimize or compensate the negative effects of hydro-peaking on the fish fauna of the 7 km long river reach on the river Lech (southern Germany). Model based investigations allow to access the impact from currently authorized discharge regime, suggest operational and structural measures within the reach in terms of reducing the risk of stranding for fish larvae and select the measures most easy to implement and with the largest ecological benefit. The paper describes the approach for accessing the effects of hydro-peaking based on 2D hydrodynamic modelling, fuzzy logic based habitat modelling and information on cutting-edge biological investigations on fish larvae from Lunz experimental facility (Austria). (authors)

  12. Load following operation of nuclear power plants for meeting power system requirements

    International Nuclear Information System (INIS)

    Isoda, Hachiro

    1987-01-01

    This paper describes a calculating program on the availability factors of nuclear, thermal and pumed storage hydro power stations and some calculated results for typical three load factors, 55 %, 60 % and 71 %, are provided when the share of the nuclea power station in the generation facilities is increased. The load following requirement of the nuclear power station is also provided. Load following requirement: If there is a 10 % pumped storage hydro power station, the nuclear power station enables to be operated with its rated output up to 30 % - 35 % of its share. Its daily load following operation for 40 % and 50 % nuclear power station needs every weekend and every day respectively. Availability factor: The availability factor of the nuclear power station manages to get 80 % (maximum availability factor of the nuclear power station in this study) up to 30 % share of it with 10 % pumpued storage hydro power station. When the nuclear power station shares 40 % and 50 %, its availability factor decreases down 1 % and 5 % respectively. (author)

  13. Proposed Hydro-Quebec development plan, 1990-1992: Horizon 1999

    International Nuclear Information System (INIS)

    1990-01-01

    The supply and demand for electric power in Quebec are reviewed and forecasts of future demand are established, using various scenarios of demographic, economic, and energy development. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. In addition, objectives and strategies are presented for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 36 figs., 54 tabs

  14. Hydro Ottawa Holding Inc. 2004 annual report : 3 ways to make 1 powerful connection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    An overview of the municipally owned Hydro Ottawa Holding Inc. was presented in this annual report. In 2004, the utility moved out of a deficit position for the first time in its 4 year history. Consolidated net earnings from continuing and discontinued operations increased to $19.7 million from $2.6 million. The increase was due mainly to decreases in operating, maintenance and administrative costs, as well as to the recovery of the cost of regulatory assets and the gain on the disposal of discontinued operations. As a result, the Corporation's deficit of $16.9 million became retained earnings of $2.8 million. Financial highlights were presented, as well as a comparison of distributors' charges with other utilities. It was noted that transparency and accountability were improved with more regular reporting to its shareholder, the City of Ottawa. In late 2004, City Council approved Hydro Ottawa Holding's 5 year consolidated financial plan which recommended that the City invest $37.8 million back into the Corporation and receive payment of the balance. The payback of the City's loan was financed through the Corporation's placement, in 2005, of $200 million in bonds. New programs included a trash-to-electricity contract, a bounty on energy-wasting fridges, and Telecom Ottawa's Data Backup and Recovery Service. Hydro Ottawa Holding Inc. is an amalgamation of 5 Ottawa-area utilities, and now provides leadership to 3 subsidiaries: Hydro Ottawa Ltd., Energy Ottawa Inc., and Telecom Ottawa Holding Inc.. Financial highlights of the 3 subsidiaries were also provided. tabs., figs.

  15. [Ontario Hydro]. Corporate performance report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in 1993, beginning with overall results in such areas as customer service, environmental stewardship, human resources, and finance. This is followed by reports from the Generation Business Group, Customer Services Group, Corporate Business Group, General Counsel and Secretary, Ontario Hydro Audit, Strategic Planning, Environment and Communication Group, and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix includes summary financial statements

  16. Hydro-Quebec annual report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    An overview is presented of the activities of Hydro-Quebec for the year ended December 31, 1993, as well as its financial status. Export sales of electricity to other Canadian provinces and the USA are reported. Research programs and demonstration projects are described, as well as the utility's international activities. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1993, total sales volume was 152.1 TWh, or 7.5 TWh more than in 1992, for a total sales revenue of $7,004 million, an increase of 3.5% over 1992. Sales in Quebec increased 5 TWh, with nearly all of this increase coming from the industrial sector. Exports outside of Quebec totalled 15 TWh, or 20% more than in 1992. The largest increase in exports was in the form of short-term sales to the USA. Expenditures in 1993 were $3,761 million, only slightly more than in 1992. Facilities commissioned in 1993 included the Brisay power plant, two of six units at the Laforge-1 plant, and the north portion of the 12th transmission line from the LaGrande complex. Total installed capacity of the Hydro-Quebec system reached 29,131 MW, and total power produced was 131.6 TWh. Total length of transmission and distribution lines in 1993 reached 29,869 km and 100,908 km respectively. 9 figs., 17 tabs

  17. Small-scale hydro power plant on the main drinking water line La Rippaz in Bex, Switzerland - Feasibility study; Petite centrale hydraulique. Aduction d'eau potable La Rippaz. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Chapallaz, J.-M. [Jean-Marc Chapallaz, Ingenieur EPFL/SIA, Baulmes (Switzerland); Meylan, D. [Perret-Gentil et Rey et Associes SA, Ingenieurs civils et Ingenieurs Conseil EPF/SIA, Lausanne (Switzerland)

    2008-04-15

    This report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the replacement work of the drinking-water supply line from the location of the spring water collection to a water reservoir belonging to the rock-salt mining company 'Hotel des Salines' in Bex, Switzerland. Built 1887 and following years this water supply system has already been designed for power generation as well. However, a 40 kW micro-scale turbine has only been installed 2005 in the lower part of the water supply system (hydraulic head: 115 m). The new project includes the replacement of the existing piping by a penstock, the construction of a new water collection reservoir at the highest point, the construction of a new 300 kW hydro power plant using the upper part of the water supply system (hydraulic head: 520 m), and some improvements of the existing lower power plant. The available water flow rate lies in the range 57-70 l/s, all the year round. The question arising is whether this construction project could be financed by the benefit from the sale of electricity that could be produced by the two power plants. The authors of the study estimate the power production to be 2.5 kWh/y. If the electricity can be sold at least at CHF 0.20/kWh for 25 years this could finance the whole project that has an estimated cost of CHF 7,000,000.

  18. 75 FR 66083 - Iron Mask Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13723-000] Iron Mask Hydro..., Iron Mask Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Iron Mask Pumped Storage Project to be...

  19. Integrated Control for Small Power Wind Generator

    Directory of Open Access Journals (Sweden)

    Hongliang Liu

    2018-05-01

    Full Text Available The control strategies of the small power wind generator are usually divided into the maximum power point tracking (MPPT case, which requires the wind generator produce power as much as possible, and the power limited control (PLC case that demands the wind generator produce a power level following the load requirement. Integration of these two operating cases responding to flexible and sophisticated power demands is the main topic of this article. A small power wind generator including the sluggish mechanical dynamic phenomenon, which uses the permanent magnet synchronous generator, is introduced to validate different control methods integrating MPPT and PLC cases and based on hysteresis control. It is a matter of an indirect power control method derived from three direct methods following perturb and observe principle as well as from a look-up table. To analyze and compare the proposed power control methods, which are implemented into an emulator of a small power wind generator, a power demand profile is used. This profile is randomly generated based on measured rapid wind velocity data. Analyzing experimental results, from the power viewpoint, all proposed methods reveal steady-state error with big amount of peak resulting from the nature of perturb and observe.

  20. Retrofitting of the small hydro electric scheme 'Moulin d'en Bas' in Cronay, Switzerland - Preliminary project; Rehabilitation du Moulin d'en Bas, commune de Cronay. Etude d'avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-09-15

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) is a feasibility study for the retrofitting of the small hydro electric scheme 'Moulin d'en Bas' located in Cronay on the Mentue river, Switzerland. Two variants are considered. In the first one the existing scheme uses a 4.72 m water fall and its power amounts to about 25 kW. A 4-blades Kaplan turbine is foreseen to generate 160,000 kWh/y. In the second variant, weir and penstock have to be adapted in order to take advantage of the full 6.74 m water fall indicated in the water-use concession granted in 1952. A new fish pass has to be built as well. The resulting electric power is in this case 80 kW and the power generation by the turbo group 353,000 kWh/y, about 60% of which in the wintertime. Electricity production cost is estimated to be 0.282 CHF/kWh in the second variant.

  1. Hydroelectric power - energy at no cost at all; Wasserkraft - Strom, der vom Himmel faellt

    Energy Technology Data Exchange (ETDEWEB)

    Goede, E. [Stuttgart Univ. (Germany). Inst. fuer Stroemungsmechanik und Hydraulische Stroemungsmaschinen

    1997-12-31

    The harnessing and enhanced use of renewable energy today is a matter of lively debate and much concern. Amazingly, hydro power is either rarely considered in these discussions or viewed in a negative light. But hydro power continues to be the most important source of renewable energy, and its use potential is considerable and should be taken into account when, for instance, agreeing on or implementing carbon dioxide reduction targets. Small hydro power stations are an effective means of harnessing existing energy potentials. (orig.) [Deutsch] Ueber die Nutzung und den Ausbau regenerativer Energien wird heutzutage lebhaft diskutiert und gerungen. Es mag erstaunen, dass in diesen Diskussionen die Wasserkraft kaum Beachtung findet oder in einem schlechten Licht gesehen wird. Dabei ist die Wasserkraft nach wie vor bei weitem die wichtigsten Quelle regenerativer Energie, und sie besitzt ein beachtliches Ausbaupotential, das man wenigstens ins Kalkuel ziehen sollte, wenn es etwa darum geht, CO{sub 2}-Minderungsziele zu vereinbaren bzw. anzustreben. Die Kleinwasserkraft kann hier als Chance gesehen werden, noch vorhandene Energiepotentiale sinnvoll zu nutzen. (orig.)

  2. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    Full text: A future energy system with stronger coupling to Europe and with an increased share of non-regulated renewables will lead to increasing variability of the demand faced by the hydro system. In a market based system these variations will be reflected by larger daily price variations, both in the Elspot day ahead market, the Elbas intraday market and in the balancing market. With its unique regulation capabilities, hydro power will be very well positioned to handle these variations. However, existing model concepts for long term hydro scheduling were not developed for this framework, and do not take the new market conditions into account to a sufficient degree. Therefore hydro scheduling tools used for upgrading and investment analysis as well as analysing consequences of new environmental demands need adaptation to a finer temporal resolution, and to perform optimisation under varying constraints and uncertain input data for inflow and electricity prices. Focus is on investment analysis for a river system or power producer. Existing models can be grouped in the long-term (scheduling models with a time horizon up to 5 years) EOPS (Vansimtap), EOPS-ST (SimtapEffekt) and ProdRisk, and the shortterm scheduling models with a typical time horizon up to a few weeks, but focus on 1-2 days (SHOP and ID-SIM). A perfect tool in the present context would combine the properties of the long term stochastic optimisation models with the modelling details of SHOP and/or ID-SIM. However, this is probably not possible and simplifications will be necessary. Some important deficiencies in the present long term models are: Insufficiently realistic plant models in the relevant optimization models; Time delays are not handled; Handing of flexible / state dependent constraints; Handling of ramping constraints; Modelling of the cost of frequent regulations (wear and tear); Reserve markets As a result of these deficiencies the investment analysis does not adequately assess the value

  3. Chalifoux Dairy and Hydro-Quebec, partners in innovation; Laiterie Chalifoux et Hydro-Quebec, partenaires dans l`innovation des entreprises quebecoises

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-12-31

    Recently, Chalifoux Dairy of Sorel, Quebec, invested, with the help of Hydro-Quebec, in three new technologies to increase the energy efficiency of the production line. A summary of these technological improvements was presented. The three new technologies were induction heating pasteurization, ultraviolet sterilization and ultrafiltration. Ultra-high temperature (UHT) induction heating is now used to pasteurize cream and chocolate milk. This new pasteurization method has reduced product returns from 5 per cent to nil. UHT cream is packaged in small disposable containers that are previously sterilized by a radiant ultraviolet source. An ultrafiltration method also has been implemented for production of specialty cheese at the dairy. This process yields 20 per cent more production with 30 per cent less energy than traditional methods. Hydro-Quebec assisted Chalifoux Dairy with a subsidy of $596,000 for these energy-efficiency modifications.

  4. Impact on the aquatic environment of hydro-peaking in hydroelectric plants

    International Nuclear Information System (INIS)

    Sabaton, C.; Lauters, F.; Valentin, S.

    1996-01-01

    There are a number of types of hydroelectric installations on French rivers. Some of these intermittently turbine water stored in dammed reservoirs, in order to use available reserves at the most opportune moment for power generation. These plants, run under 'hydro-peaking' management procedures, cause variations in discharge in river sections downstream of the restitution, on a daily or weekly scale. To answer questions concerning the impact of such variations in discharge on the aquatic environment, EDF launched a research program aimed at describing and better understanding the physical and biological phenomena related to hydro-peaking and assessing the possible impact of this type of plant management on French streams. Seven sites subjects to hydro-peaking were studied on rivers with mean flow rates lower than 20 m 3 /s (which corresponds to over 65 % of EDF hydro-peaking sites). Four themes in particular were examined: hydraulic characterization of hydro-peaking, modifications in thermal regime and water quality, response of benthic invertebrates and response of fish populations to hydro-peaking. For fish as well as for invertebrates, the role of the base discharge - in the absence of peaking flow - and that of the morphology of the river bed (and, in particular, the presence of shelter for fish) during periods of strong discharge were clearly highlighted. Impact assessment requires a precise diagnosis of the state of biocenoses. To carry out such a diagnosis, one must reason in terms of species, life phase (particularly the most sensitive phases) and population structure as well as the type of stream and the faunizone involved. A risk assessment is possible by means of simultaneous study of the morphology of the river bed and the response of the signal generated by hydro-peaking in terms of hydrology and physical characteristics downstream of the restitution. (authors)

  5. The Power of Small

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 20; Issue 12. The Power of Small: Championing the Underdogs of Modern Medicine. Suvasini Ramaswamy Anirban Mitra. General Article Volume 20 Issue 12 December 2015 pp 1136-1153 ...

  6. The Statoil/Hydro fusion in a continental shelf perspective

    International Nuclear Information System (INIS)

    Osmundsen, Petter

    2007-01-01

    The article analysis the consequences of the Statoil/Hydro merger on the development on the Norwegian continental shelf. Various indicators of results of the market power the merger are presented and the effects of reduced competition on the markets are discussed. The advantages of the merger on the activities on the shelf are analyzed. (tk)

  7. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  8. Hydro One smart meter/smart grid : realizing the vision

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, R. [Hydro One Networks Inc., Toronto, ON (Canada)

    2010-07-01

    Ontario's Hydro One Networks has been installing smart meters as part of its smart grid plan since 2007. The smart grid plan forms part of the utility's overall aim to create an energy conservation culture across the province. The utility now has over 1 million installed meters over a 640,000{sup 2} km territory. The smart grid planning team has adopted the use of an upgraded open protocol standards-based communications as part of its 2-way high bandwidth network. The utility is using a 1.8 Ghz worldwide interoperability for microwave access (WiMAX) spectrum designed specifically for the protection of electric utility infrastructure. The utility is now incorporating proof-of-concept applications including automated reclosers, remote terminal units, demand management devices and mobile technologies for use in its smart grid procedures. Various smart zone business scenarios were also described in this power point presentation, as well as details of Hydro One's integration plans for vendors and other power systems. tabs., figs.

  9. Power quality of small rural industries

    International Nuclear Information System (INIS)

    Koval, D.O.; Leonard, J.J.; Licsko, Z.J.

    1991-01-01

    Successful and economical operation of small rural industries (e.g., grain, dairy, irrigation, pig, poultry, beef feedlots, etc.) is a fundamental objective of society. However, when the performance and life expectancy of industrial electronic and electrical equipment is significantly affected by power supply anomalies caused by polluting loads at an industrial site and by utility normal operational activities, the economic benefits of this technology are quickly eradicated. This paper will present the results of a detailed power quality survey of 23 small rural industries sponsored by the Canadian Electrical Association and provides a knowledge base on rural power quality and the possible origins of power supply problems experienced at the various industrial sites. The results of the survey provide a basis for mitigating actions by the utilities and their rural industrial customers to design and operate their electrical systems to minimize the effects of power supply anomalies

  10. Competitive analysis of small hydroelectric power plants

    International Nuclear Information System (INIS)

    Assad, L.S.; Placido, R.

    1990-01-01

    The agreement between CPFL/UNICAMP/EFEI for developing energetic planning of Small Hydroelectric Power Plants construction is described. Some notions for showing the more economic alternative between decide by Small Hydroelectric Power Plants construction and continue supply the market by inter ligated system generation are shown in this stage of the agreement. (author)

  11. B.C. Hydro drops Duke Point

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The abandonment of the proposed natural gas-fired Duke Point Power Project on Vancouver Island was discussed. It was suggested that the continuing appeal process increases the risk that the plant will not be built in time. The news followed a decision by the British Columbia (BC) Court of Appeal to hear an appeal of the project by a number of intervenors. Over $170 million has been spent on the project to date. The decision will impact the BC treasury, as the amount is being deducted from the dividends that BC Hydro would have paid to the government. A coalition of individuals and environmental groups, as well as local industry, are opposed to the plant on the basis of increased greenhouse (GHG) emissions and higher natural gas prices. The project would have required a natural gas pipeline to be built under Georgia Strait. The project was thought necessary due to the deteriorating condition of high voltage direct current cables running under the strait. BC Hydro's fallback plan for the island is load reduction. A new transmission line is also planned

  12. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  13. Using project management techniques in hydro-relicensing

    International Nuclear Information System (INIS)

    Dominie, D.; Richard, J.

    1991-01-01

    This paper reports that to answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company has applied the principles of project management, including the use of computerized scheduling to its hydro relicensing efforts. This approach involves early inter-departmental cooperation in mapping out critical path scheduling by requiring the project team to: Outline the scope of the project in its entirety. Clarify and define components of the project. Quantify and categorize assumptions and dependencies. Identify constraints. The computer-generated schedule of this cooperative planning effort provides a graphic representation of the team's plan and become the focal point for refinements and adjustments necessary to complete an application on time. The use of project management techniques facilities team understanding of the realities and limitations in the relicensing process. These techniques encourage cooperative action, and use a solution-oriented process resulting in a product which can be a useful tool in communicating with resource agencies and regulators

  14. Advances in the implementation of a generic long term model for the hydro industry

    International Nuclear Information System (INIS)

    Welt, F.

    2004-01-01

    This presentation describes the Vista Long Term (LT) simulation and decision tool developed for the hydropower and water resource industries by Synexus Global. Vista maximizes the value of hydro resources while addressing environmental concerns. It improves water resource management for all uses over the long term. The tool has been used and adapted to many systems around the world, including Bonneville Power Administration, Reliant Energy, PacifiCorp and Great Lakes Power in the United States and Nova Scotia Power, Yukon Energy, and Newfoundland Hydro in Canada. Vista also helps to plan alternative operating policies and system upgrades by maximizing the expected value of generation and transactions. The tool provides reservoir releases, generation, flows, levels and transactions. Hydroelectric generating facilities that use the Vista tool have improved clean energy production as well as increased revenues resulting from reservoir and plant optimization. tabs., figs

  15. Electricity production in a hydro system with a reservoir constraint

    Energy Technology Data Exchange (ETDEWEB)

    Mathiesen, Lars; Skaar, Jostein; Soergard, Lars

    2011-02-15

    The purpose of this article is to analyze how market power may affect the allocation of production between seasons (summer and winter) in a hydro power system with reservoir constraints and inflow uncertainty. We find that even without market power the price in the summer season may be lower than the expected price in the winter season. Market power may in some situations lead to higher sales and lower price in summer than the competitive outcome and in other situations to the opposite result. Furthermore, market power may lead to a smaller price difference between summer and winter than in a competitive market. (Author)

  16. A Comparison of Off-Grid-Pumped Hydro Storage and Grid-Tied Options for an IRSOFC-HAWT Power Generator

    Directory of Open Access Journals (Sweden)

    Mahdi Majidniya

    2017-01-01

    Full Text Available An Internal Reforming Solid Oxide Fuel Cell (IRSOFC is modeled thermodynamically; a Horizontal Axis Wind Turbine (HAWT is designed; the combined IRSOFC-HAWT system should create a reliable source of electricity for the demand of a village located in Manjil, Iran. The output power of HAWT is unstable, but by controlling the fuel rate for the IRSOFC it is possible to have a stable power output from the combined system. When the electricity demand is over the peak or the wind speed is low/unstable/significantly high, the generated power may not be sufficient. To solve this problem, two scenarios are considered: connecting to the grid or using a Pumped Hydro Storage (PHS. For the second scenario, the extra produced electricity is saved when the production is more than demand and can be used when the extra power is needed. The economic analysis is done based on the economic conditions in Iran. The results will show a period of return about 9.5 and 13 years with the levelized cost of electricity about 0.0747 and 0.0882 $/kWh for the first and second scenarios, respectively. Furthermore, effects of some parameters such as the electricity price and the real interest rate are discussed.

  17. BC hydro: Annual report, 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The third largest electric utility in Canada, B.C. Hydro services almost 1.3 million customers in an area containing over 92 per cent of British Columbia's population. B.C. Hydro's mission is to generate, transmit and distribute electricity. This annual report covers the business and financial performance of B.C. Hydro, and financial statistics.

  18. Cumulative Effects of Micro-Hydro Development on the Fisheries of the Swan River Drainage, Montana, First Annual Progress Report (Covering Field Season July-November 1982).

    Energy Technology Data Exchange (ETDEWEB)

    Leathe, Stephen A.; Graham, Patrick J.

    1984-03-01

    This fisheries study is to determine the potential cumulative biological and economic effects of 20 small or micro-hydro-electric facilities (less than 5 megawatts) proposed to be constructed on tributaries to the Swan River, a 1738 square kilometer (671 square mile) drainage located in northwestern Montana. The study addresses portions of measure 1204 (b) (2) of the Norwthwest Power Planning Council's Columbia River Basin Fish and Wildlife Program. Aerial pre-surveys conducted during 1982 identified 102 stream reaches that may support fish populations in the Swan drainage between Swan and Lindbergh lakes. These reaches were located in 49 tributary streams and constituted 416 kilometers (258 miles) of potential fish habitat. Construction of all proposed small hydro projects would divert water from 54 kilometers (34 miles) or about 13 percent of the tributary system. Only two of the 20 proposed hydro sites did not support trout populations and most were populated by migratory bull trout and westslope cutthroat trout. Potential cumulative habitat losses that could result from dewatering of all proposed project areas were predicted using a stream reach classification scheme involving stream gradient, drainage ara, and fish population data. Preliminary results of this worst case analysis indicate that 23, 19 and 6 percent of the high quality rearing habitat for cutthroat, bull, and brook trout respectively would be lost.

  19. Negotiating river ecosystems: Impact assessment and conflict mediation in the cases of hydro-power construction

    International Nuclear Information System (INIS)

    Karjalainen, Timo P.; Jaervikoski, Timo

    2010-01-01

    In this paper we discuss how the legitimacy of the impact assessment process is a key issue in conflict mediation in environmental impact assessment. We contrast two EIA cases in hydro-power generation plans made for the Ii River, Finland in different decades, and evaluate how impact assessment in these cases has contributed to the creation, mediation and resolution of conflicts. We focus on the elements of distributional and procedural justice that made the former EIA process more legitimate and consensual and the latter more conflictual. The results indicate that it is crucial for conflict mediation to include all the values and interests of the parties in the goal-setting process and in the definition and assessment of alternatives. The analysis also indicates that procedural justice is the most important to help the people and groups involved to accept the legitimacy of the impact assessment process: how different parties and their values and interests are recognized, and how participation and distribution of power are organized in an impact assessment process. It is confirmed in this article that SIA may act as a mediator or a forum providing a process through which competing knowledge claims, various values and interests can be discussed and linked to the proposed alternatives and interventions.

  20. Hydro power projects- boon or bane for the rural communities of Western Himalayas

    Directory of Open Access Journals (Sweden)

    Jolli Virat

    2017-06-01

    Full Text Available A survey based questionnaire research was conducted in Sainj Valley, Himachal Pradesh. The survey was conducted in June-July 2015 in an area affected due to hydro power projects (HPPs. A total of 48 individuals participated in the survey. Based on survey questionnaire, it was found that native rural people perceived that HPPs had significantly brought positive change in life of native people and were therefore in favour of HPPs. However, large section of native people had not been benefited of HPPs. The decline in agriculture production, change in cropping pattern and poor access of water to native people were some of the negative implications of these projects. The dependence of native people on forest resources has not declined much and still number of local individuals depends on forest resources to supplement their income. Though, in current scenario people has benefited from such projects, however it is not known if it will be sustained for long time due to current unsustainable agriculture practices and limited employment opportunities. Moreover, Government should provide adequate compensation to the affected individuals by either providing a suitable land for agriculture or employment under various rural sector schemes.

  1. Power system small signal stability analysis and control

    CERN Document Server

    Mondal, Debasish; Sengupta, Aparajita

    2014-01-01

    Power System Small Signal Stability Analysis and Control presents a detailed analysis of the problem of severe outages due to the sustained growth of small signal oscillations in modern interconnected power systems. The ever-expanding nature of power systems and the rapid upgrade to smart grid technologies call for the implementation of robust and optimal controls. Power systems that are forced to operate close to their stability limit have resulted in the use of control devices by utility companies to improve the performance of the transmission system against commonly occurring power system

  2. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  3. A Novel Pumped Hydro Combined with Compressed Air Energy Storage System

    Directory of Open Access Journals (Sweden)

    Erren Yao

    2013-03-01

    Full Text Available A novel pumped hydro combined with compressed air energy storage (PHCA system is proposed in this paper to resolve the problems of bulk energy storage in the wind power generation industry over an area in China, which is characterised by drought and water shortages. Thermodynamic analysis of the energy storage system, which focuses on the pre-set pressure, storage volume capacity, water air volume ratio, pump performance, and water turbine performance of the storage system, is also presented. This paper discovers how such parameters affect the performance of the whole system. The ideal performance of this novel system has the following advantages: a simple, highly effective and low cost structure, which is comparable to the efficiency of a traditional pumped hydro storage system. Research results show a great solution to the current storage constraints encountered in the development of the wind power industry in China, which have been widely recognised as a bottleneck in the wind energy storage industry.

  4. Pulling the plug : how the Liberals' plan to dismantle BC Hydro threatens taxpayers, businesses, communities and jobs

    International Nuclear Information System (INIS)

    Veerkamp, M.

    2002-06-01

    The British Columbia government is planning to sell-off and deregulate the province's integrated, publicly-owned electric utilities despite election promises not to do so. The author argues that the consequences will be catastrophic with massive price increasing, rolling brownouts and service cuts. A recent poll indicates that 76 per cent of British Columbians oppose the decision to sell, 68 per cent do not support deregulation, and 83 per cent support a full public consultation before any changes are made. In response, the BC Citizens for Public Power Society was formed to give voice to British Columbians demand that their power system remain in public hands. This report presents a chronology of events for BC Hydro, and describes the experience of other jurisdictions with electricity deregulation. The BC Task Force on Energy Policy has released a report which claims that a fully competitive energy market will attract private capital and bring more energy supply, thereby lowering energy costs and increasing energy security. British Columbians condemn that report, arguing that it is too ideological and poorly substantiated. This paper discusses the impact that deregulation would have on the transmission system, the environment, and on local governments and small communities. It was noted that if the public electricity resources are removed from public ownership and control, the province's future options will be restricted under the North American Free Trade Agreement (NAFTA) and the General Agreement on Trade in Services (GATS). The BC Citizens for Public Power Society argues that the future power needs of the province are best met by public investment and energy conservation using BC Hydro. 65 refs

  5. [Ontario Hydro]. Corporate performance report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values established in the approved corporate financial plan and work program budget. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in mid-1993, beginning with overall results in such areas as customer satisfaction, electricity sales, human resources, and environmental protection. This is followed by reports from the Electricity Group (supply, generation, transmission), the Energy Services and Environment Group (load saved and shifted, non-utility generation, retail distribution), and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix contains summary financial statements

  6. Piloting a community-based micro-hydro power generation project

    International Nuclear Information System (INIS)

    Buenafe, Menandro B.; Eponio, Melchor P.

    1998-01-01

    A community based microhydro power generation project was successfully piloted in Dulao, Malibcong, Abra. The project started with the identification and evaluation of five potential creeks flowing near villages in the Cordillera hinterlands. All the sites showed comparative hydrologic features except for one factor that decided the project's implementation: the willingness of the people to invest by providing their labor- counterpart. On this account, only the residents of Dulao put their full trust in the implementing institutions, the main reason for the project's success. The micro-hydro power project consisted of an earthen diversion canal that conveyed part of the streamflow unto a forebay located above the powerhouse. The forebay was built of riprap and concrete, equipped with a desilting chamber, trashrack, a spillway, and an overflow canal that directed water to the ricefields downstream. A polyethylenevinyl penstock was laid underground along the slope,from the forebay to the powerhouse. The penstock assumed a Y-configuration inside the powerhouse where the two crossflow turbines were separately mounted on each arms. Two butterfly valves were positioned just before each turbine so that flow can be alternately controlled for the two machines. A tailrace drained the discharge from the turbines back to the same creek. Originally, the setup could only operate the 3kw turbine that ran the ricemill by means of a flat belt drive. Upon further hydrologic study, an 8kw crossflow turbine was installed to a drive a 7.5kva, two-pole, single phase alternator. The 8kw turbine can operate under three design flows, namely: 20,40, and 60 liters per second. The turbine-alternator setup was achieved by a pulley and belt drive arrangement. Typically, the AC generator was provided with monitoring instruments like a volt meter, frequency meter, and ampere meter. An electronic load controller (ELC) was observed to effectively protect the alternator from runaway speeds, over

  7. Critical Clearing Time and Wind Power in Small Isolated Power Systems Considering Inertia Emulation

    Directory of Open Access Journals (Sweden)

    Elías Jesús Medina-Domínguez

    2015-11-01

    Full Text Available The stability and security of small and isolated power systems can be compromised when large amounts of wind power enter them. Wind power integration depends on such factors as power generation capacity, conventional generation technology or grid topology. Another issue that can be considered is critical clearing time (CCT. In this paper, wind power and CCT are studied in a small isolated power system. Two types of wind turbines are considered: a squirrel cage induction generator (SCIG and a full converter. Moreover, the full converter wind turbine’s inertia emulation capability is considered, and its impact on CCT is discussed. Voltage is taken into account because of its importance in power systems of this kind. The study focuses on the small, isolated Lanzarote-Fuerteventura power system, which is expected to be in operation by 2020.

  8. BC Hydro's smart grid strategy within a global transformation

    Energy Technology Data Exchange (ETDEWEB)

    Zucker, R. [BC Hydro, Vancouver, BC (Canada). Smart Grid Development Program

    2009-07-01

    Electric utilities are now examining methods of ensuring adequate supply and energy security for the future. This presentation discussed BC Hydro's smart grid program within the context of other global automated metering initiatives. Over 60 per cent of the United States' gross domestic product (GDP) is derived from industries and services dependent on electricity. Power outages and interruptions cost the country an estimated $150 billion per year. A more efficient and reliable grid will provide $1.8 trillion in annual additive revenue by 2020. BC Hydro currently has over 1.8 million customers, and is comprised of 41 dam sites, 30 hydro facilities, and 9 thermal units. The utility has over 18,000 km of transmission lines and 56,000 km of distribution lines. The province's energy plan hopes to achieve energy self-sufficiency by 2016, and all new electric generation will be net zero greenhouse gas (GHG) or serve as an offset for GHG emissions. The BC Hydro smart meter program will help to support the utility's conservation program. The smart grid will include fundamental applications for metering, meter data management, distribution automation and management, and substation automation. The foundation of the smart meter system is comprised of IT and telecommunications infrastructure and a circuit topology. Reliability and power quality improvements of 40 per cent are anticipated, as well as significant improvements in energy efficiency and customer service. Smart grid applications are being designed for microgrids and plug-in vehicles. A voltage control system has been designed to allow the real time management of energy flows. It was concluded that smart grid programs will provide significant benefits to utility customers and communities in the province. tabs., figs.

  9. Standardized CSR and climate performance: why is Shell willing, but Hydro reluctant?; Shell; Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Boasson, Elin Lerum; Wettestad, Joergen

    2007-06-15

    This report aims to contribute to the ongoing discussion concerning whether CSR merely serves to streamline company rhetoric or also has an influence on actual efforts. We discuss the tangible effects of CSR instruments on the climate-related rules and performances of the two different oil companies Hydro and Shell. First we explore whether similar CSR instruments lead to similar climate-related rules and practices in the two companies. Both Hydro and Shell adhere to the Global Compact (GC), the Global Reporting Initiative (GRI), the Carbon Disclosure Project (CDP) and the Global Gas Flaring Reduction Public-Private Partnership (GGFR). The report concludes that the GC has not rendered any tangible effects in either of the companies. Concerning the other instruments, Hydro has only followed the instrument requirements that fit their initial approach, and refrained from all deviating requirements. Shell has been more malleable, but we have noted few effects on the actual emissions and business portfolio resulting from the instrument adherence. Second, we assess how the differing results of the similar CSR portfolio may be explained. The reluctant attitude of the leaders in Hydro and the strong CSR motivation of Shell's executives result in significant differences. Hydro executives are able to constrain the effects of the instrument adherence. With Shell we note the opposite pattern: Its leaders promoted the instruments to be translated into internal rules, but a general lack of hierarchical structures hinders them from governing the conduct of various sub-organisations. The very diversity of the Shell culture helps to explain why the efforts of its executives have resulted in limited impact. The strength of the Hydro culture makes the corporation resistant to the instruments. Moreover, Hydro is strikingly shielded by virtue of its strong position in Norway. In contrast, Shell is more strongly affected by the global field of petroleum and the global field of CSR

  10. The safety of Ontario's nuclear power reactors. A scientific and technical review. Ontario Hydro Submission to the Ontario Nuclear Safety Review

    International Nuclear Information System (INIS)

    1987-01-01

    Ontario Hydro is responsible for the safety of its nuclear stations: safety analysis, design and construction, training of operators, operating practices, and maintenance procedures. The utility must demonstrate to the regulatory body and the public that it is capable of operating nuclear stations safely. the dedicated attention of management and workers alike has been given to the achievement of an excellent safety record. Safety begins with well understood corporate goals, objectives and policies, and the clear assignment of responsibilities to well-trained, competent people who have the relevant experience and the right information and equipment. A prime cause of both the Chernobyl and the Three Mile Island accidents was a breakdown in operational procedures and human factors. On the contrary, the pressure tube failure at Pickering unit 2 in 1983 was understood almost immediately by the operators, who took the correct steps to shut down the reactor. This success is related to well-designed control room information systems and good understanding of fundamentals by the operators. Increasingly, in the design of nuclear plant control and instrumentation systems and in training in Ontario Hydro, the well-being, capabilities and limitations of humans are being taken into account. This report describes the series of barriers between the radioactive material in the fuel and the series of barriers between the radioactive material in the fuel and the environment, and the stringent quality control and technical measures taken to make the likelihood of malfunctions very small. Defence in depth protection for the public is a feature of all Ontario Hydro nuclear stations. As safety-related systems are updated in new stations, improvements are in some cases being backfitted to older stations

  11. Small-scale power plant potential in Finland

    International Nuclear Information System (INIS)

    Helynen, S.

    1993-01-01

    The presentation discusses the small-scale power plant potential in Finland. The study of the potential is limited to W-scale power plants producing both electric power and heat using solid fuels. The basic power plant dimensioning and electric power load determination is based on traditional boiler and gas turbine technology. The possible sites for power plants are communities using district heating, and industrialized sites needing process steam or heat. In 1990 70 % (17 TWh) of district heat was produced by gas turbines. Ten communities have an own back-pressure power plant, and 40 communities buy heat from industrial plants, owing back-pressure power generation. Additionally about 40 communes buy district heat from companies, owned by power companies and industry. Estimates of small-scale power plant potential has been made plant wise on the basis of district heat loads and industrial heat needs. The scale of the plants has been limited to scale 3 MWe or more. The choosing of the fuel depends on the local conditions. The cheapest indigenous fuels in many communes are industrial wood wastes, and both milled and sod peat. The potential of steam technology based small-scale power plants has been estimated to be about 50 plants in 1992/1993, the total power of which is 220-260 MW. The largest estimate is base situation, in which there would be energy cooperation between the communes and industry. The fuel used by the power plants would be about 5.4-6.6 TWh/a corresponding to 270-330 million FIM/a. The total investment costs of the plants would be about 2.0 billion FIM. The plants would employ about 250 persons, and the fuel supply (wood or peat) about 100 persons

  12. Environment and power; Umwelt und Energie

    Energy Technology Data Exchange (ETDEWEB)

    Franz, W.; Ramser, H.J.; Stadler, M. (eds.)

    2006-07-01

    Within the scope of the 35th economic seminar with he title '' Environment and power'' held between 18th and 21st September, 2006, at the monastery Ottobeuren (Federal Republic of Germany), the following lectures were held: (a) Environment and power: introduction into the subject matter (Karl Heinrich Opplaender); (b) Theoretical fundamentals of the sustainability (Wolfgang Buchholz); (c) Ecological fiscal reform and double dividend (Ronnie Schoeb); (d) ''My friend, that is all mere theory'' - Notes to the emission trading (Christoph Boehringer); (e) Environmental policy and locational competition (Michael Rauscher); (f) Dynamical incentives of environment political instruments - a survey (Till Requate); (g) Product differentiation in the presence of environmental concern, network effects and compatibility: The automobile market (Klaus Conrad); (h) The liability right as an instrument of environment policy (Alfred Endres); (i) environment economy and experimental evidence (Joachim Weimann); (j) Market design in the energy economy (Felix Muesgen, Axel Ockenfels); (k) Re-regulation of the liberalized energy markets in Europe (Carl Christian von Weizsaecker).

  13. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  14. A Model of Small Capacity Power Plant in Tateli Village, North Sulawesi

    Science.gov (United States)

    Sangari, F. J.; Rompas, P. T. D.

    2017-03-01

    The electricity supply in North Sulawesi is still very limited so ubiquitous electric current outage. It makes rural communities have problems in life because most uses electrical energy. One of the solutions is a model of power plants to supply electricity in Tateli village, Minahasa, North Sulawesi, Indonesia. The objective of this research is to get the model that generate electrical energy for household needs through power plant that using a model of Picohydro with cross flow turbine in Tateli village. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of research, analysis of hydropower ability and analyzing costs of power plant. The result showed that the design model of cross flow turbines used in pico-hydro hydropower installations is connected to a generator to produce electrical energy maximum of 3.29 kW for household needs. This analyze will be propose to local government of Minahasa, North Sulawesi, Indonesia to be followed.

  15. Evaluation de l'activité antioxydante des extraits hydro-ethanoliques ...

    African Journals Online (AJOL)

    activity of the hydro-ethanolic leaf and bark extracts of Piliostigma thonningii. The polyphenol content was determined with ... scavenger activity with respective IC50 values 39.3 ± 1.00 μg / ml and 109 ± 6.25 μg / ml. Reducing power of bark extract was ..... arginase inhibitory potentials of extracts from. Artocarpus altilis,. Ficus.

  16. Hydro Tasmania - renewable energy drivers, action and plans

    International Nuclear Information System (INIS)

    Gill, R.; Andrews, H.

    2005-01-01

    In Tasmania, the island state of Australia, the generator, Hydro Tasmania, is pushing technical, environmental and business boundaries in its plans to integrate a relatively high proportion (up to 20 percent) of large wind generators into its current complex mix of large and small hydropower plants. Its plans include projects to increase the efficiency of its older hydropower equipment as it prepares to supply much needed peaking capacity to the market in southern Australia via the groundbreaking Basslink undersea cable, which is due for completion in November 2005. Taken as a package these developments are creating a globally significant reference site for renewable energy systems. The paper will describe what is happening, and more importantly what is underpinning the developments, including: the harnessing of Tasmania's world-class wind resource, where recently constructed 1.75 MW wind turbines are achieving capacity factors of over 45 percent - some of the best productivity in the world today; the application of leading environmental science measures to ensure the sustainability of both the new wind farm developments and the transformation of the hydropower system to meet peak capacity demands; the relevance of the existing large hydropower storages that can operate in synergy with the wind resource; the contribution of Australia's renewable energy certificate scheme, which is effectively doubling the value of new renewable energy developments compared with existing generation sources; the application of the latest technology in hydropower turbines, combined with power system expertise from the world's leading manufacturers, to increase the efficiency of older hydropower generators, thereby more effectively harnessing the existing environmental footprint; and the transformation of Hydro Tasmania's business into a significant supplier and trader of premium value peak energy into the sophisticated Australian National Electricity Market. (author)

  17. Microgrids: Reliable power in a small package

    International Nuclear Information System (INIS)

    Krotz, D.

    2003-01-01

    A new approach to power generation in which a cluster of small, on-site generators serve office buildings, industrial parks and homes, is being developed by scientists at the University of California's Berkeley Campus. Called microgrid, the system may well be the answer to satisfying the growing thirst for electricity without the danger of overburdening the aging transmission lines, or building 1,000 new power plants that would be required to meet the ever-growing demand. The new approach relies on small generators such as ordinary reciprocating engines, microturbines, fuel cells, and photovoltaic systems. This microgrid of small generators appears to the main grid as just an ordinary customer. When the grid offers cheap electricity, the microgrid can purchase it, but when prices rise, or when there is a power failure, the microgrid can isolate itself, ensuring uninterrupted power to critical equipment such as computers, communications infrastructure and control systems. The idea is that if sensitive equipment can be powered locally, the vulnerable centralized power system becomes much less critical. The microgrid could be powered by recovered waste heat, a currently wasted by-product of power generation. Waste heat could also cool and dehumidify buildings using thermally activated processes. Microgrids also have the potential to introduce real competition into the electricity market by offering customers a choice; this is expected to have the effect of imposing competitive discipline on power companies. To extend the potential even farther, it is considered well within the realm of possibility that by introducing fuel cell-powered cars into the microgrid, the car could be used as a source of power by simply parking it and plugging it in to supply electricity to the home or the office

  18. The deregulation of the electricity industry : a commercial and industrial perspective from Ontario Hydro's point of view

    International Nuclear Information System (INIS)

    Bojovski, T.

    2000-01-01

    A summary of how consumers will be affected by the newly opened competitive electricity market in Ontario was presented. Consumers will be able to choose their suppliers of electricity and will have the option to buy packages which may include natural gas and long distance telephone service. Licensed wholesalers will purchase the lowest-cost electricity from power generators anywhere in North America and will have the freedom to charge spot market prices. Ontario Hydro, which has been operating as a monopoly has now been separated into three separate entities including power generation, transmission and distribution, and wholesale market administration through the Ontario Power Generation Inc., Hydro One, and the Independent Market Operator (IMO) respectively. The main objective of this unbundling of services was to bring electricity prices down. An agreement entitled Market Power Mitigation ensures that when competition officially begins, Ontario Power Generation will have to observe a revenue cap on a fixed amount of energy and allow new suppliers to act as providers of electricity. As electrical power demand increases there are concerns over power reliability and costly power outages. 2 figs

  19. Micro power plants - interests, conflicts and possibilities - a focus group study with emphasis on business and environmental stakeholders; Smaakraftverk - interesser, konflikter og muligheter

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerck, M.; Vistad, O.I.

    2009-05-15

    In recent years, interest for the development of micro hydro-electric power plants have been on the increase. There are many and often varying public interests associated with energy development. We have particularly examined the main arguments that are used and what values seem to be based on prevailing attitudes and opinions. Our selected study sites are three municipalities with a relatively extensive small hydro power development: Foerde, Sogn and Fjordane, Hordaland and Kvinnherad Sirdal in Vest-Agder. We have used qualitative methods through semi-structured interviews and discussions in groups, so-called focus groups. Focus groups create an interaction between group participants that can bring out more information than by interviewing each participant individually. Qualitative methods are used to capture the phenomena and assessments that are difficult to quantify or measure, such as people's views and assessments. Our data is not documented facts, but 'assessments of reality.' We had two focus groups in each municipality, a group with representatives from interested organizations in conservation, outdoor recreation, or personal scientific expertise / interest (referred to as environmental groups), and one with representatives from landowners, developers, and other economic interests (called Business Groups). For many of the topics we touched upon such varied viewpoints fairly systematically between our two groups. Business groups see great economic opportunities for both local communities and landowners, arguing that while the development of small hydro power is a very important environmental measure because it allows renewable energy without adverse climate effects and will replace the climate damaging coal in Europe. Environmental groups argue that the new small hydro energy produces no net greenhouse benefit because it only comes on top of polluting coal power, it replaces it. They think it is important to question the environmental impact

  20. Optimum operation of a small power production facility

    Energy Technology Data Exchange (ETDEWEB)

    Capehart, B.L.; Mahoney, J.F.; Sivazlian, B.D.

    1983-09-01

    To help reduce the U.S.A.'s dependence on imported oil for electrical power generation, the 1978 National Energy Act established regulations to promote construction and operation of cogeneration and small power production facilities. Many of these facilities are presently under construction, with a great number planned. This paper examines the operation of a small power production facility with on-site generation and storage, on-site use, and connection to an electric utility grid system for the purpose of both selling excess power and buying power. It is assumed that the buying and selling price of electricity varies frequently during the day and that the relevant price and demand data may be accurately projected into the near future. With this system description, a mathematical model is formulated and solved by linear programming to obtain a series of periodic buy and sell decisions so as to maximize the profit from operating the small power production facility. Results are presented to illustrate the methodology for determining potential profits.

  1. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  2. Ontario Hydro annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1987-04-01

    Ontario Hydro`s annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics.

  3. Many and small or large and few? A comparison of the environmental effects of different strategies for the development of hydropower plants.; Mange og smaa eller store og faa? En sammenligning av miljoevirkningene ved ulike strategier for utvikling av vannkraft.

    Energy Technology Data Exchange (ETDEWEB)

    Bakken, Tor Haakon; Sundt, Haakon; Ruud, Audun

    2012-11-01

    This study compared the cumulative environmental impact of 27 small hydro power plants to the environmental impact of an average of three large hydropower plants, which range from the small farms and the average of the major producing about as much energy. Based on the empirical basis used in this study are the environmental impacts of large hydropower fewer and less severe than the cumulative environmental impacts from the 27 small plants. The results are, however marginal in favor of big hydro power plants and suffers from uncertainties due to lack of precision in the raw data, limitations of the methodic of accumulating environmental effects of many small facilities and extensive use of discretion in the transition between the scientific description of the environmental impacts and impact classes (Statens Vegvesen, 2006). The input data in the study has primarily been published available environmental impact assessment (KU). The results must therefore be said to have limited power statement in order to draw general conclusions. The identified environmental effects are to some extent, different from the type and size, so that an individual valuation and political or administrative priorities will to a large extent determine the preferred strategy for the development of hydropower. From 2012 promoted the production stimulating action as a result of common certificate market with Sweden. Small hydro power plants has so far been a priority in Norway, but when Norway implements EU Water Framework Directive in all areas of precipitation, one should be aware of our findings, especially regarding the potential in expanding of existing hydropower plants. (auth)

  4. Potential of hydroelectric power in the Alps

    International Nuclear Information System (INIS)

    Schleiss, A.

    2002-01-01

    This article presents in detail the current hydro power production, consumption and export in the six main countries using this alpine energy resource: France, Germany, Austria, Italy, Slovenia and Switzerland. For the time being, one quarter of the Alps' hydro energy resource is still unused. The article discusses the opportunity offered by the current European electricity market deregulation to extend alpine hydro power use. For each country, the expected increase in production capacity, including technical, geographical and economic aspects, is analysed and reported in several figures and tables

  5. On the development of small nuclear power stations

    International Nuclear Information System (INIS)

    Goetzmann, C.A.

    1989-01-01

    There are weighty reasons for and against the building of small nuclear power stations. Factors such as specific investment costs, opportunities for and areas of application, geographical conditions as well as those relating to infrastructure, security and availability play an important role in the planning, construction and running of a nuclear power station. For the usual large power stations, the comparatively low specific investment costs and a proven technology are favorable factors which minimize the investment risk. The article presents an overview of reasons for using small power stations and also considers the difficulties which would arise in practice. (orig.) [de

  6. Nuclear power as a regional energy supply

    International Nuclear Information System (INIS)

    MacLoon, Frank.

    1983-02-01

    The author describes the Point Lepreau nuclear power plant and its impact on the electric power grid and the economy of the small province of New Brunswick. The 600 MW CANDU reactor is considered suitable for small operations and has an excellent world record. Although nuclear energy has high capital costs, its fuel costs are low, thus rendering it comparatively inflation free. Its fuel costs of 3 to 4 mills are contrasted with 40 mills for oil-fuelled units. The cost advantage of uranium over coal and oil permits New Brunswick to put aside funds for waste management and decommissioning. Regulatory streamlining is needed to reduce both expense and time of construction. The CANDU system is ideally suited to providing base load, with coal as an intermediate load supply and hydro for peaking. There is room for tidal power as a future part of the mix

  7. The current situation of SHPs (small-scale hydroelectric power plant) in the Southeast and Northeast regions of Brazil; O panorama atual das PCHs (pequenas centrais hidreletricas) na regiao sudeste e nordeste do Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Tiago Filho, Geraldo Lucio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais; Stano Junior, Angelo [PCH Luiz Dias, Itajuba, MG (Brazil); Campos, Bruno Thiago Lopes da Costa; Silva, Evilene Santos [Centro Nacional de Referencia em Pequenas Centrais Hidreletricas (CERPCH), Itajuba, MG (Brazil)], Emails: tiago@unifei.edu.br, stano@unifei.edu.br, brunoloppez@unifei.edu.br, evilene@unifei.edu.br

    2006-07-01

    With the recent changes in the regulatory mark and also with the creation of the market of Brazilian energy, it reappears the Small Hydro Power Plant - SHP's economic strategic for the decentralizes generation to the attendance of small consuming centers. This article presents the current situation of SHP's in the Southeast and Northeast areas of the Country, besides treating in a wider context, of the need of investments in power generation starting from this renewable energy model for attendance of some communities of those areas that still lack of this benefit. The electrification process should not be seen only by the optics of the financial attractiveness, because an important part of rural homes still exists without light, but also as a social investment, capable to rescue citizenship to take education and respect to the rural communities of those areas. (author)

  8. Re-potentiation of hydro-generators: a proposal of analysis and implementation methodology; Repotenciacao de hidrogeradores: uma proposta de metodologia de analise e implantacao

    Energy Technology Data Exchange (ETDEWEB)

    Sa, Fabio Salomao Fernandes

    1996-07-01

    The hydro-generators suffer during its operative useful life a combination of stresses of nature thermal, electric, mechanics and environmental. With the time, they are going losing the capacity to support those stresses and the power plants suffer, more and more frequently, undesirable stops for repair services and maintenance. In function of the high costs incurred with these stopped, the operation of the power plant can be economically impracticable. That unavailability of the generation for the electric system, it results in reduction of the reliability, burdening the politics of load ruling. The re-potentiation is a proposal that seeks to extend the useful life of hydro-generators, at the same time that it try to rescue the reliability and the readiness of the plant, with larger power. The power increase is usually made possible, or for the surplus of the hydro resources in excess, or for the reduction of the losses of all the components of the energy flow. That work proposes a methodology structured starting from the estimate of the potential, of rising of data, of the basic project and of the executive project. Modern techniques of engineering, new processes and new materials, allow the re-potentiation of those hydro-generators returning them new useful life, under conditions economically justifiable.

  9. The HydroColor App: Above Water Measurements of Remote Sensing Reflectance and Turbidity Using a Smartphone Camera

    Science.gov (United States)

    Leeuw, Thomas; Boss, Emmanuel

    2018-01-01

    HydroColor is a mobile application that utilizes a smartphone’s camera and auxiliary sensors to measure the remote sensing reflectance of natural water bodies. HydroColor uses the smartphone’s digital camera as a three-band radiometer. Users are directed by the application to collect a series of three images. These images are used to calculate the remote sensing reflectance in the red, green, and blue broad wavelength bands. As with satellite measurements, the reflectance can be inverted to estimate the concentration of absorbing and scattering substances in the water, which are predominately composed of suspended sediment, chlorophyll, and dissolved organic matter. This publication describes the measurement method and investigates the precision of HydroColor’s reflectance and turbidity estimates compared to commercial instruments. It is shown that HydroColor can measure the remote sensing reflectance to within 26% of a precision radiometer and turbidity within 24% of a portable turbidimeter. HydroColor distinguishes itself from other water quality camera methods in that its operation is based on radiometric measurements instead of image color. HydroColor is one of the few mobile applications to use a smartphone as a completely objective sensor, as opposed to subjective user observations or color matching using the human eye. This makes HydroColor a powerful tool for crowdsourcing of aquatic optical data. PMID:29337917

  10. The HydroColor App: Above Water Measurements of Remote Sensing Reflectance and Turbidity Using a Smartphone Camera.

    Science.gov (United States)

    Leeuw, Thomas; Boss, Emmanuel

    2018-01-16

    HydroColor is a mobile application that utilizes a smartphone's camera and auxiliary sensors to measure the remote sensing reflectance of natural water bodies. HydroColor uses the smartphone's digital camera as a three-band radiometer. Users are directed by the application to collect a series of three images. These images are used to calculate the remote sensing reflectance in the red, green, and blue broad wavelength bands. As with satellite measurements, the reflectance can be inverted to estimate the concentration of absorbing and scattering substances in the water, which are predominately composed of suspended sediment, chlorophyll, and dissolved organic matter. This publication describes the measurement method and investigates the precision of HydroColor's reflectance and turbidity estimates compared to commercial instruments. It is shown that HydroColor can measure the remote sensing reflectance to within 26% of a precision radiometer and turbidity within 24% of a portable turbidimeter. HydroColor distinguishes itself from other water quality camera methods in that its operation is based on radiometric measurements instead of image color. HydroColor is one of the few mobile applications to use a smartphone as a completely objective sensor, as opposed to subjective user observations or color matching using the human eye. This makes HydroColor a powerful tool for crowdsourcing of aquatic optical data.

  11. BC Hydro's integrated resource planning : the 2004 IEP and beyond

    International Nuclear Information System (INIS)

    Soulsby, R.

    2004-01-01

    An outline of BC Hydro Integrated Electricity Plan (IEP) was presented in this paper, along with details of its environmental, social and business performance and statistics of its net income and revenue for 2003-2004. The IEP was created to match long term load to supply in the most cost-effective way and is also the basis for resource acquisition plans. In addition, the IEP models performance of portfolios of resources on a system-wide basis, considers uncertainties through sensitivity analysis and measures and evaluates multiple attributes from various portfolios. A flow chart of processes informed by the IEP was presented. Guiding principles behind the creation of the plan include low electricity rates and public ownership; secure, reliable supply; private sector development; environmental responsibility, with no nuclear power sources; ensuring energy self-sufficiency; and maintaining a balanced portfolio of resources. A pie chart of BC Hydro's current portfolio mix was presented as well as a supply and demand outlook and details of plans and new capacity resources required before 2013. Various resource options were presented. Key outcomes of First Nations and stakeholder engagement include the acceptance of BC Hydro as a sustainable energy company; a desire for higher priority on reliability and low cost; an agreement over the Power Smart 10 year plan; a general agreement that the current, balanced approach to resource acquisition was appropriate; and a desire for more rate options. There was an assurance that BC Hydro would continue to engage First Nations and stakeholders in integrated electricity planning. Other outcomes included requests for more information about outage and outage planning and process improvements; support to maintain low rates; a preference for maximizing use of existing facilities; support for wood waste cogeneration. A broad range of options were reviewed, but no superior portfolio was identified within the parameters of this paper

  12. Short-term regulation of hydro powerplants. Studies on the environmental effects

    International Nuclear Information System (INIS)

    Sinisalmi, T.; Riihimaeki, J.; Vehanen, T.; Yrjaenae, T.

    1997-01-01

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs

  13. Short-term regulation of hydro powerplants. Studies on the environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    Sinisalmi, T. [ed.; Forsius, J.; Muotka, J.; Soimakallio, H. [Imatran Voima Oy, Vantaa (Finland); Riihimaeki, J. [VTT, Espoo (Finland); Vehanen, T. [Finnish Game and Fisheries Research Inst. (Finland); Yrjaenae, T. [North Ostrobothnia Regional Environmental Centre, Oulu (Finland)

    1997-12-31

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs.

  14. BC Hydro best practices : energy efficiency and integrated planning

    International Nuclear Information System (INIS)

    Henriques, D.

    2004-01-01

    The key elements to success in energy efficiency include integrated energy planning, a review of conservation potential, pursuing a target, risk sharing between all parties, and long term planning when making investments in demand side management (DSM). The barriers to cost effective energy efficiency investment were also outlined along with the scope of the conservation potential review which included 95 per cent of electricity end use applications in all market sectors including residential, commercial, institutional and industrial. BC Hydro's Power Smart program focuses on energy efficiency and load displacement to meet 35 per cent of the utility's forecasted growth by 2012. The sources of savings within each of the market sectors were identified. Key recommendations regarding energy efficiency and conservation were also presented with reference to financial incentives offered by BC Hydro to consumers to encourage a switch to more efficient lighting systems. 10 figs

  15. Hydro-power installation at Fein-Elast Grabher AG in Lichtensteig - Preliminary study; Fein-Elast Grabher AG - Lichtensteig. Stauwehr / Schleusenbruecke / Wasserkraftanlage. Vorprojektstudie - Technischer Bericht

    Energy Technology Data Exchange (ETDEWEB)

    Hintermann, M.

    2008-07-01

    This technical report for the Swiss Federal Office of Energy (SFOE) describes project variants for the replacement of a hydro-power plant on the River Thur in Lichtensteig, Switzerland. The new installation is to produce more power by using a greater volume of water than the old installation, parts of which date from 1820. The report reviews possibilities for and restrictions on the renewal of the installation and recommends one of four possible variants proposed.. Water-flow statistics and flood-protection issues are discussed. Environmental issues connected with the project are also examined. Energy production figures, cost estimates and economic viability issues are discussed. The proposed course of events involved in replacing the hydropower installation and an associated road bridge is described.

  16. Hydro operational restrictions forum: Licensee workshop summary. Final report

    International Nuclear Information System (INIS)

    Ebrahim, S.; Monahan, C.K.; Pistor, B.; West, A.

    1998-08-01

    In spite of producing no atmospheric pollutants, hydroelectric power plants often go unrecognized as a unique provider of clean, efficient, low-cost energy. A concerted effort is needed to ensure that these attributes are fully accounted for when considering the uses and benefits of available water resources. Relicensing reviews and other regulatory activities associated with continued operation of hydro generation projects have drawn increased attention to hydro resources. This attention has typically resulted in imposition of conditions having a substantial cost impact without, necessarily, reflecting a full appreciation of the resource's benefits and attributes. With the extensive countrywide effort in relicensing and regulation, there is an opportunity to collect and compile lessons learned. This is particularly true with respect to preferred practices, technologies, and techniques applicable to required studies and mitigation measures. Such compilation will enable the industry and related stakeholders to improve quality and effectiveness while reducing costs of relicensing and mitigation for continued hydro operations. As a technology leader for the industry, EPRI is in a unique position to identify and document these techniques and practices. This report comprises the proceedings of the hydro licensees workshop. Fifteen licensee representatives with recent or current involvement in the relicensing process gathered at this workshop and shared their experiences, both good and bad. Support was strong among attendees for EPRI's effort to collect and compile these, along with the experiences of others, into a guidebook of accepted practices. Initial workshop findings were used in the second workshop to solicit buy-in from agencies and NGOs to the need for--as well as proposed scope of--a compendium of preferred practices

  17. Small and medium-sized nuclear power plants

    International Nuclear Information System (INIS)

    Schmidt, R.

    1986-01-01

    Small and medium-sized nuclear power plants have long been under discussion as possible applications of nuclear power in countries with small transmission grid systems, in threshold countries and developing countries, and under special local supply conditions. IAEA has condensed and promoted this interest and tried to establish the demand, and possibilities of meeting it, in special events and campaigns. In recent years, considerable interest was registered even in industrialized countries, but here specially for heating and process heat generation applications and for special purposes and, in medium-sized units, also for combined supplies of electricity and heat. This corresponds to special reactor and plant concepts, some of which have already been developed to a stage at which construction work could begin. The analysis presented deals with necessary preconditions on the sides of the users and the vendors, with problems of economy, infrastructure and financing and with the market prospects of small nuclear power plants. (orig./HP) [de

  18. Dynamic Model for Hydro-Turbine Generator Units Based on a Database Method for Guide Bearings

    Directory of Open Access Journals (Sweden)

    Yong Xu

    2013-01-01

    Full Text Available A suitable dynamic model of rotor system is of great significance not only for supplying knowledge of the fault mechanism, but also for assisting in machine health monitoring research. Many techniques have been developed for properly modeling the radial vibration of large hydro-turbine generator units. However, an applicable dynamic model has not yet been reported in literature due to the complexity of the boundary conditions and exciting forces. In this paper, a finite element (FE rotor dynamic model of radial vibration taking account of operating conditions is proposed. A brief and practical database method is employed to model the guide bearing. Taking advantage of the method, rotating speed and bearing clearance can be considered in the model. A novel algorithm, which can take account of both transient and steady-state analysis, is proposed to solve the model. Dynamic response for rotor model of 125 MW hydro-turbine generator units in Gezhouba Power Station is simulated. Field data from Optimal Maintenance Information System for Hydro power plants (HOMIS are analyzed compared with the simulation. Results illustrate the application value of the model in providing knowledge of the fault mechanism and in failure diagnosis.

  19. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  20. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  1. Small high cooling power space cooler

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, T. V.; Raab, J.; Durand, D.; Tward, E. [Northrop Grumman Aerospace Systems Redondo Beach, Ca, 90278 (United States)

    2014-01-29

    The small High Efficiency pulse tube Cooler (HEC) cooler, that has been produced and flown on a number of space infrared instruments, was originally designed to provide cooling of 10 W @ 95 K. It achieved its goal with >50% margin when limited by the 180 W output ac power of its flight electronics. It has also been produced in 2 stage configurations, typically for simultaneously cooling of focal planes to temperatures as low as 35 K and optics at higher temperatures. The need for even higher cooling power in such a low mass cryocooler is motivated by the advent of large focal plane arrays. With the current availability at NGAS of much larger power cryocooler flight electronics, reliable long term operation in space with much larger cooling powers is now possible with the flight proven 4 kg HEC mechanical cooler. Even though the single stage cooler design can be re-qualified for those larger input powers without design change, we redesigned both the linear and coaxial version passive pulse tube cold heads to re-optimize them for high power cooling at temperatures above 130 K while rejecting heat to 300 K. Small changes to the regenerator packing, the re-optimization of the tuned inertance and no change to the compressor resulted in the increased performance at 150 K. The cooler operating at 290 W input power achieves 35 W@ 150 K corresponding to a specific cooling power at 150 K of 8.25 W/W and a very high specific power of 72.5 W/Kg. At these powers the cooler still maintains large stroke, thermal and current margins. In this paper we will present the measured data and the changes to this flight proven cooler that were made to achieve this increased performance.

  2. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    International Nuclear Information System (INIS)

    Jidin, Razali; Othman, Bahari

    2013-01-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  3. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    Science.gov (United States)

    Jidin, Razali; Othman, Bahari

    2013-06-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  4. Optimal wind-hydro solution for the Marmara region of Turkey to meet electricity demand

    International Nuclear Information System (INIS)

    Dursun, Bahtiyar; Alboyaci, Bora; Gokcol, Cihan

    2011-01-01

    Wind power technology is now a reliable electricity production system. It presents an economically attractive solution for the continuously increasing energy demand of the Marmara region located in Turkey. However, the stochastic behavior of wind speed in the Marmara region can lead to significant disharmony between wind energy production and electricity demand. Therefore, to overcome wind's variable nature, a more reliable solution would be to integrate hydropower with wind energy. In this study, a methodology to estimate an optimal wind-hydro solution is developed and it is subsequently applied to six typical different site cases in the Marmara region in order to define the most beneficial configuration of the wind-hydro system. All numerical calculations are based on the long-term wind speed measurements, electrical load demand and operational characteristics of the system components. -- Research highlights: → This study is the first application of a wind-hydro pumped storage system in Turkey. → The methodology developed in this study is applied to the six sites in the Marmara region of Turkey. A wind - hydro pumped storage system is proposed to meet the electric energy demand of the Marmara region.

  5. Ekstraksi Minyak Atsiri Dari Akar Wangi Menggunakan Metode Steam - Hydro distillation dan Hydro distilation dengan Pemanas Microwave

    Directory of Open Access Journals (Sweden)

    Maulana M Al Hanief

    2013-09-01

    Full Text Available Penelitian ini bertujuan untuk memperoleh minyak atsiri dari akar wangi dengan modifikasi metode steam-hydro distillation dan hydro distillation yaitu menggunakan pemanasan microwave kemudian membandingkan hasilnya dengan penelitian sebelumnya. Modifikasi ini diharapkan lebih efisien dalam masalah lama penyulingan dan kualitas serta kuantitas rendemen minyak yang lebih baik dan banyak. Penelitian ini menggunakan dua metode yaitu steam-hydro distillation dan hydro distillation dengan pemanfaatan gelombang mikro. Bahan baku yang digunakan dalam penelitian adalah akar wangi jenis pulus wangi yang tumbuh di Kabupaten Garut, Jawa Barat. Variabel yang digunakan adalah bahan baku yang dicacah dan bahan baku utuh dengan variasi massa bahan 50 gr, 60, gr, 70 gr, 80 gr, dan 90 gr dengan pelarut air sebanyak 450 ml dalam labau distiller berukuran 1000 ml. Lama penyulingan adalah lima jam dengan pengamatan tiap 30 menit serta daya yang digunakan adalah 400 Watt. Analisa terhadap hasil minyak atsiri yang diperoleh antara lain analisa GC-MS, spesific gravity, indeks bias, dan bilangan asam. Hasil dari penelitian ini dibandingkan dengan hasil penelitian terdahulu yang tidak memanfaatkan gelombang mikro. Dari hasil penelitian diperoleh % rendemen kumulatif, sifat fisik, sifat kimia, dan kandungan komponen minyak dari metode steam-hydro distillation lebih baik dibandingkan metode hydro distillation ditandai dengan kuantitas dan kualitas yang sesuai dengan SNI.  Sementara itu jika dibandingkan dengan metode terdahulu dapat disimpulkan bahwa penggunaan gelombang mikro lebih efisien dalam waktu dan kuantitas serta kualitas minyak yang lebih baik dibandingkan tanpa penggunaan gelombang mikro

  6. Hydro-Quebec is profitable

    International Nuclear Information System (INIS)

    Poirier, M.

    1997-01-01

    The pros and cons of the potential privatisation of Hydro-Quebec were discussed. A brief review of charges of less than competent management, low profitability and the corporation's recent administrative restructuring was presented. The general thrust of the argument was that Hydro-Quebec plays a crucial role in the economic development of Quebec, it can be made to be more profitable and that for the good of Quebec it should continue as a public corporation under the control of the provincial government

  7. On optimization of power production

    Energy Technology Data Exchange (ETDEWEB)

    Feltenmark, S.

    1997-01-01

    Short-term optimization of power production is treated. It concerns the problem of determining a production schedule for a power system, which minimizes the total cost of production, while satisfying various constraints. The thesis consists of an introductory chapter, four chapters that each concerns a specific problem area (economic dispatch, unit commitment, hydro power planning and cogeneration optimization), plus a chapter with relevant theory. The emphasis of the thesis is on the mathematical structures that arise in problems in this field, and how to exploit them algorithmically. A recurring theme is convexification, either implicit, by dualization, or explicit, as in our approach to hydro power optimization. 134 refs

  8. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  9. Ontario Hydro's experience in implementing on-the-job training for chemical technicians

    International Nuclear Information System (INIS)

    Cooper, G.A.

    1996-01-01

    Since 1989, Ontario Hydro Nuclear has been developing and implementing formalized On-the-Job Training for qualifying its nuclear power plant chemical laboratory staff. This paper focuses on the process followed in designing, developing and implementing this training, with emphasis on the strengths and weaknesses of the program. 7 refs, 3 figs

  10. Electricity is the real target - nuclear energy the scapegoat. Comparison between nuclear energy and hydro power voting behaviour

    International Nuclear Information System (INIS)

    Aegerter, Irene

    1993-01-01

    As nuclear community sometimes feel desperate because the nuclear energy is a very special subject triggering so much controversy among women and young persons especially it has been found that the battle against nuclear energy is just a pretext. Comparing the campaign on a referendum against hydropower - voted in Switzerland in may 1992 it was found astonishingly that exactly the same arguments were applied as during the campaign for the phase out of nuclear energy in 1990. The results were presented at PIME 1991. Voting behaviour for nuclear energy and hydro power are comparable: the gender gap (32% acceptance by men versus 48% by women) found in the 1992 vote about stopping hydropower plants in Switzerland was bigger than the one found in the 1990 vote about nuclear energy. A detailed analysis of these data is presented

  11. Retrofitting of the hydro-power installation of Vicques, Switzerland; Rehabilitation de la centrale de Vicques, Emile Aebin SA. Etude d'avant-projet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    This technical report for the Swiss Federal Office of Energy (SFOE) reports on work involved in obtaining a new concession for the use of the water in the mill canal in Vicques, Switzerland on the Scheulte river. The author states that the existing concession for use is not optimal and should be optimised. A window of opportunity exists as a new river protection law requires a higher residual water flow rate and the creation of a fish passage facility. The paper discusses how the production of electrical energy could be doubled. The existing installation is described. Details of existing conduits and the installed power generator are presented. The measures proposed for the renewal of the hydro-power plant are described. An annex includes a copy of the construction plans.

  12. Hydro or the waltz of managers

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A critique of current management and personnel problems at Hydro-Quebec was presented. With 20,000 employees and some of the world's greatest hydroelectric projects to its credit, Hydro-Quebec has historically been a source of great pride for its employees and Quebec's society. However, recent problems related to management, bureaucratization and communications within the corporation have led to important moral problems within the workforce. Management of the corporation under the newly appointed president, Andre Caille, the issue of profitability and competitiveness, the worsening morale among employees and the relationship between Hydro-Quebec and the provincial government were the principal topics discussed

  13. Small hydropower plants in the region of Mariovo (Macedonia)

    International Nuclear Information System (INIS)

    Panovski, Sotir; Anastasov, Ljupcho

    2003-01-01

    In this paper the results of an initial Pre-feasibility study within the framework of the PHARE Programme for Cross Border Cooperation between Republic of Macedonia and Republic of Greece. In this study we have looked at the existing research originating from three sources. The Strategies for Economic Development of Republic of Macedonia, the Development Plans of the Electric Power Company of Macedonia as well as the existing technical documentation and studies on a level of idea projects for specific location for small hydropower plants in Mariovo region. Furthermore, analysis and evaluation of this documentation is included. Research done in this region has produced evidence of numerous potential locations for small hydropower plants (total of 46) generating power between 58 kW and 4900 kW, discharging between 0,082 m 3 /s and 30 m 3 /s with a head between 6 m and 208 m for which we have detailed data. Furthermore, in the paper we pay attention to the enormous and so far unrealised hydro energetic power which could be utilised by constructing small hydropower plants in Republic of Macedonia. specifically in the Mariovo region. (Original)

  14. The Flakt-Hydro process: flue gas desulfurization by use of seawater

    Energy Technology Data Exchange (ETDEWEB)

    Xia, W.Z. [ABB China Limited, Shanghai (China)

    1999-07-01

    ABB's seawater scrubbing process (the Flakt-Hydro process) for flue gas desulfurization has recently triggered interest among power producers because of its simple operating principle and high reliability. The process uses seawater to absorb and neutralize sulfur dioxide in flue gases. The absorbed gas is oxidized and returned to the ocean in the form it originated in the first place, namely as dissolved sulfate salts. The process uses the seawater downstream of the power plant condensers. This paper gives an introduction to the basic principle of the process and presents some of the recent power plant applications, namely at the Paiton Private Power Project; Phase 1 (2 x 670 MWe) in Indonesia and at the Shenzhen West Power Plant, Unit 2 (300 MWe) in China.

  15. Hydro-plankton characteristics and their relationship with sardine and anchovy distributions on the French shelf of the Bay of Biscay

    Directory of Open Access Journals (Sweden)

    Pierre Petitgas

    2006-06-01

    Full Text Available The spatial pattern in hydro-plankton and fish distributions and their relationship were analysed based on the spring 2000 fisheries acoustic survey. The importance of this survey was that it was a multi-disciplinary platform which collected an extensive set of parameters in the hydro-plankton leading to a potentially finer description of hydro-plankton conditions and fish habitats. More than 50 variables were measured on a grid of stations, in four compartments of the ecosystem: hydrology, nutrients, primary producers and meso-zooplankton. First, a joint analysis of all hydro-plankton compartments was performed using multiple factor analysis (MFA. The method was used to estimate a compromise factorial space common to all compartments in which the stations were grouped by hierarchical clustering. The groups were represented spatially and a strong spatial pattern was evidenced. The fish and their spawned eggs were sampled along transect lines using acoustics and CUFES (continuous underway fish egg samplers. The distribution of the fish and their eggs was analysed in relation to the hydro-plankton groups of stations and difference in fish density across hydro-plankton conditions was tested by a pair-wise multiple comparison procedure. Anchovy was associated with a lesser number of hydro-plankton conditions than sardine. Eggs of both species were also associated with a lesser number of conditions than the fish. Finally, the gain provided by using the extensive set of hydro-plankton parameters for mapping large-scale hydro-plankton conditions was analysed in comparison with the situation in which a small set of parameters was available. The extensive set of parameters allowed more hydro-plankton conditions to be identified but only in the coastal area and not on the shelf. Size fractionated chlorophyll was determinant for tracking river plume hydro-plankton condition. However, the fish did not respond to the variety of the coastal hydro

  16. 76 FR 26331 - Dijji Corp., Hydro Environmental Resources, Inc. (n/k/a EXIM Internet Group, Inc.), Hydrogen...

    Science.gov (United States)

    2011-05-06

    ... SECURITIES AND EXCHANGE COMMISSION [File No. 500-1] Dijji Corp., Hydro Environmental Resources, Inc. (n/k/a EXIM Internet Group, Inc.), Hydrogen Power, Inc., and InsynQ, Inc.; Order of Suspension of... there is a lack of current and accurate information concerning the securities of Hydrogen Power, Inc...

  17. Impact of Wind Power Plants with Full Converter Wind Turbines on Power System Small-Signal Stability

    DEFF Research Database (Denmark)

    Knüppel, Thyge; Nygaard Nielsen, Jørgen; Dixon, Andrew

    Wind power is being developed in power systems all around the world, and already today wind power covers more than 20 % of the electricity consumption in some countries. As the size of each wind power plant (WPP) increases and as the levels of penetration reaches certain magnitudes, the inclusion...... of the dynamic properties of the WPPs in the power system stability studies become important. The work presented in this report deal with the impact of WPPs based on full converter wind turbines (WTs) on the power system small-signal rotor angle stability. During small disturbances in the power system, the rotor...... speed of the synchronous machines will eventually return to its steady state if the power system is small-signal stable. The dynamic properties of a WPP are fundamentally dierent from those of a synchronous machine, and the interaction of WPPs with the synchronous machines in power system oscillations...

  18. Hydro-Quebec 2004 annual report : growing strong

    International Nuclear Information System (INIS)

    2005-01-01

    This report provides a consolidated review of the operations of Hydro-Quebec, with a focus on energy production, energy sales, and environmental commitment. Hydro-Quebec is a major producer, transmission provider and distributor of electricity, conducting research and promotional activities in energy and energy transformation and conservation. The Quebec government is its sole shareholder. The company is divided into six divisions and now competes freely with other power producers, while its transmission and distribution remain regulated. Sales totalled $10.7 billion, up 1.8 per cent over 2003. Net income rose to $2.4 billion, up $497 million over 2003, the increase being largely due to lower financial expenses and the disposal of interests in Noverco. Dividends declared amounted to $1.3 billion, or 55 per cent of net income. Cash from operations totaled $4.0 billion, Sources of revenue also included the sale of interests in Noverco, and investment in Meiya Power Company, with the consequent repayment of nearly $1 billion in debt. Major projects of 2004 included the start of operations at the Rocher-de-Grand-Mere generating station as well as work proceeding on Eastmain-1, Peribonka, Toulnustouc and Mercier. Other projects included a partnership with the Crees of Eeyou and the filing of the Energy Efficiency Plan 2005-2010. This annual report presented the company's financial performance, executive changes and reorganization. Financial statements included a review and analysis of financial transactions, the auditor's report as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  19. Development and applications of reactor noise analysis at Ontario Hydro's CANDU reactors

    International Nuclear Information System (INIS)

    Gloeckler, O.; Tulett, M.V.

    1995-01-01

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro's CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  20. Green power programs in Canada : 2002 : Overview of Government green power policies, utility green power development programs, green power and certificate marketing initiatives, and their benefits

    International Nuclear Information System (INIS)

    Bramley, M.; Boustie, S.; Vadgama, J.; Wieler, C.; Pape-Salmon, A.; Holmes, R.

    2003-11-01

    Green power is generally defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. Green power offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities associated with these four categories in 2002 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities in the report, such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Each category was presented in detail. The information included in the report was based on surveys sent to each program proponent. Follow-up communications and other publicly available information was also included. New programs operating in 2003 or currently under development were listed. refs., 8 tabs

  1. Hydrologic design methodologies for small-scale hydro at ungauged sites. Phase 2A, British Columbia. Primer for Integrated Method for Power Analysis (IMP)

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    This report provides a user's manual for the Integrated Method for Power Analysis (IMP) series of programs, developed to aid in evaluating small-scale hydroelectric power sites in British Columbia. The primary objective of IMP is to address the problem posed by hydroelectric development at sites completely lacking in streamflow records. The province's mountainous terrain, with numerous microclimates, precluded methods of regional analysis based on regression or comparisons with gauged streams; instead, a conceptual model of physical processes on the land and in the atmosphere was used as a basis for developing IMP. The IMP package consists of five basic components: an atmospheric model of annual precipitation and 1-in-10-year 24-h maximum rainfall; a watershed model that will generate a daily series of streamflow data; a flood frequency analysis system that uses site-specific topographical information and information from the atmospheric model to generate the flood frequency curve; a hydroelectric power simulation program which determines the daily energy output for a run-of-river or reservoir storage site; and a graphics analysis package which provides direct visualization of atmospheric and streamflow data, and the results of watershed and power simulation modelling. Within each component of the program, the program requirements and capabilities are discussed. A series of sample screens are shown, illustrating the use of the IMP package for a particular simulation. 18 figs., 2 tabs.

  2. Hydro-Quebec's environmental policy

    International Nuclear Information System (INIS)

    1996-10-01

    Hydro-Quebec established a new environmental policy on August 1, 1996. A summary of the policy was presented. According to this policy statement the utility undertakes to recognize the environmental implications of its activities and assumes responsibilities for these implications by integrating them into its corporate decision-making processes. The following general principles and means of implementation have been highlighted: (1) sustainable development, (2) strict, responsible environmental management, (3) environmental research, (4) enhancement of activities and facilities, (5) information, consultation and dialogue, and (6) environmental responsibility of Hydro-Quebec personnel, subsidiaries and business partners

  3. Improvements for conventional clean energies: hydroelectric power

    International Nuclear Information System (INIS)

    Henry, P.

    1991-01-01

    Hydro-electric energy offers considerable possibilities and advantages which should be exploited before considering the construction of power which use fossil fuels. In fact: - hydro-electric is the only renewable energy available in very large quantities at competitive prices, - there are still many possibilities for producing it since at present only 14% is exploited, - hydraulic machines have been considerably improved over recent years, - the improvements make it possible to use watercourses in successive stages thus considerably reducing damage to the environment, - hydro-electric installations have a regulating effect, - vast areas of uncultivated land can be irrigated using the water reserves created by the artificial lakes. All these reasons favour intensive exploitation of hydro-electric energy reserves, in spite of the initial investment costs, which are sometimes higher than those for constructing fuel/driven power stations. (author) 9 figs., 1 tab., 3 refs

  4. Climate impact on BC Hydro's water resources

    International Nuclear Information System (INIS)

    Smith, D.; Rodenhuis, D.

    2008-01-01

    BC Hydro like many other hydro utilities has used the historical record of weather and runoff as the standard description the variability and uncertainty of the key weather drivers for its operation and planning studies. It has been conveniently assumed that this historical record is or has been statistically stationary and therefore is assumed to represent the future characteristics of climatic drivers on our system. This assumption is obviously no longer justifiable. To address the characterisation of future weather, BC Hydro has a multi-year a directed research program with the Pacific Climate Impacts Consortium to evaluate the impacts of climate change on the water resources that BC Hydro manages for hydropower generation and other uses. The objective of this program is to derive climate change adjusted meteorologic and hydrologic sequences suitable for use in system operations and planning studies. These climate-adjusted sequences then can be used to test system sensitivity to climate change scenarios relative to the baseline of the historical record. This paper describes BC Hydro's research program and the results achieved so far. (author)

  5. Operating of Small Wind Power Plants with Induction Generators

    OpenAIRE

    Jakub Nevrala; Stanislav Misak

    2008-01-01

    This paper describes different systems of small wind power plants with induction generators used in the Czech Republic. Problems of wind power plants running with induction generators are solved within partial target of the research project MSM 6198910007. For small wind power plants is used induction motor as a generator. Parameters of the name plate of motor must be resolved for generator running on measuring base. These generators are running as a separately working generators or generator...

  6. Power and pay: The union and equal pay at B.C. Electric/Hydro

    International Nuclear Information System (INIS)

    Creese, G.

    1993-01-01

    The struggle for equal pay for women in one large office union, the Office and Technical Employees' Union (OTEU), at British Columbia Electric/Hydro is analyzed. The analysis concentrates on the second phase of the equal pay movement that preoccupied the union for over 30 years starting in 1949. Equal pay for equal job-evaluation was finally achieved in 1981, yet this struggle did not produce a subsequent questioning of gender bias within the job evaluation process or the structure of the existing hierarchy of jobs. The study illustrates some of the ways that gender hierarchies and inequities are defined and reinforced by employers seeking to maintain profits by keeping labor costs down, as BC Electric/Hydro resisted eliminating the differential in male and female pay, systematically restructured unequal pay, and continually resorted to lower community standards even when the company's own job evaluation system suggested equal comparators with male jobs. Gendered jobs are also shaped by union practices, as evidenced by the OTEU's role in restructuring the postwar gender division of labor in the late 1940s, as well as their early and persistent challenges to the female differential but, at the same time, the continued marginalization of equal pay as a women's issue rather than a general union issue. 66 refs

  7. Impact of distributed and independent power generation on greenhouse gas emissions: Sri Lanka

    International Nuclear Information System (INIS)

    Wijayatunga, P.D.C.; Shrestha, R.M.

    2004-01-01

    Sri Lanka has a hydropower dominated power system with approximately two thirds of its generation capacity based on large hydro plants. The remaining one third are based on oil fired thermal generation with varying technologies, such as oil steam, Diesel, gas turbines and combined cycle plants. A significant portion of this capacity is in operation as independent power plants (IPPs). In addition to these, Sri Lanka presently has about 40 MWs of mini-hydro plants, which are distributed in the highlands and their surrounding districts, mainly connected to the primary distribution system. Further, there are a few attempts to build fuel wood fired power plants of small capacities and connect them to the grid in various parts of the country. The study presented in this paper investigates the impact of these new developments in the power sector on the overall emissions and the greenhouse gas (GHG) emissions in particular. It examines the resulting changes to the emissions and costs in the event of developing the proposed coal power plant as an IPP under different investment and operational conditions. The paper also examines the impact on emissions with 80 MWs of distributed power in different capacities of wind, mini-hydro and wood fired power plants. It is concluded that grid connected, distributed power generation (DPG) reduces emissions, with only a marginal increase in overall costs, due to the reduction in transmission and distribution network losses that result from the distributed nature of generation. These reductions can be enhanced by opting for renewable energy based DPGS, as the case presented in the paper, and coupling them with demand side management measures. It is also concluded that there is no impact on overall emissions by the base load IPPs unless they are allowed to change over to different fuel types and technologies. (author)

  8. Research on a Small Signal Stability Region Boundary Model of the Interconnected Power System with Large-Scale Wind Power

    Directory of Open Access Journals (Sweden)

    Wenying Liu

    2015-03-01

    Full Text Available For the interconnected power system with large-scale wind power, the problem of the small signal stability has become the bottleneck of restricting the sending-out of wind power as well as the security and stability of the whole power system. Around this issue, this paper establishes a small signal stability region boundary model of the interconnected power system with large-scale wind power based on catastrophe theory, providing a new method for analyzing the small signal stability. Firstly, we analyzed the typical characteristics and the mathematic model of the interconnected power system with wind power and pointed out that conventional methods can’t directly identify the topological properties of small signal stability region boundaries. For this problem, adopting catastrophe theory, we established a small signal stability region boundary model of the interconnected power system with large-scale wind power in two-dimensional power injection space and extended it to multiple dimensions to obtain the boundary model in multidimensional power injection space. Thirdly, we analyzed qualitatively the topological property’s changes of the small signal stability region boundary caused by large-scale wind power integration. Finally, we built simulation models by DIgSILENT/PowerFactory software and the final simulation results verified the correctness and effectiveness of the proposed model.

  9. Operating of Small Wind Power Plants with Induction Generators

    Directory of Open Access Journals (Sweden)

    Jakub Nevrala

    2008-01-01

    Full Text Available This paper describes different systems of small wind power plants with induction generators used in the Czech Republic. Problems of wind power plants running with induction generators are solved within partial target of the research project MSM 6198910007. For small wind power plants is used induction motor as a generator. Parameters of the name plate of motor must be resolved for generator running on measuring base. These generators are running as a separately working generators or generators connected to the power grid. Methods of control these systems as a separately working, directly connecting to power grid, control by frequency converter and wiring by synchronous cascade are confronted on the measuring base too.

  10. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  11. 77 FR 2972 - Thunder Bay Power Company, Thunder Bay Power, LLC, et al.

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Thunder Bay Power Company, Thunder Bay Power, LLC, et al.; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene Thunder Bay Power Company Project No. 2404-095 Thunder Bay Power, LLC Midwest Hydro, Inc...

  12. Operating experiences with Neutron Overpower Trip Systems in Ontario Hydro's CANDU nuclear plants

    International Nuclear Information System (INIS)

    Hnik, J.; Kozak, J.

    1991-01-01

    Operating experiences with Neutron Over Power Trip (NOP) Systems in different Ontario Hydro CANDU nuclear power plants are discussed. Lessons learned from the system operation and their impact on design improvements are presented. Retrofitting of additional tools, such as Shutdown System Monitoring computers, to improve operator interaction with the system is described. Experiences with the reliability of some of the NOP system components is also discussed. Options for future enhancements of system performance and operability are identified. (author)

  13. Valuing hydrological forecasts for a pumped storage assisted hydro facility

    Science.gov (United States)

    Zhao, Guangzhi; Davison, Matt

    2009-07-01

    SummaryThis paper estimates the value of a perfectly accurate short-term hydrological forecast to the operator of a hydro electricity generating facility which can sell its power at time varying but predictable prices. The expected value of a less accurate forecast will be smaller. We assume a simple random model for water inflows and that the costs of operating the facility, including water charges, will be the same whether or not its operator has inflow forecasts. Thus, the improvement in value from better hydrological prediction results from the increased ability of the forecast using facility to sell its power at high prices. The value of the forecast is therefore the difference between the sales of a facility operated over some time horizon with a perfect forecast, and the sales of a similar facility operated over the same time horizon with similar water inflows which, though governed by the same random model, cannot be forecast. This paper shows that the value of the forecast is an increasing function of the inflow process variance and quantifies how much the value of this perfect forecast increases with the variance of the water inflow process. Because the lifetime of hydroelectric facilities is long, the small increase observed here can lead to an increase in the profitability of hydropower investments.

  14. Design considerations, operating and maintenance experience with wet storage of Ontario Hydro's used fuel

    International Nuclear Information System (INIS)

    Frost, C.R.

    1989-01-01

    The characteristics of Ontario Hydro's fuel and at-reactor used fuel storage water pools (or used fuel bays) are described. There are two types of bay, known respectively as primary bays and auxiliary bays, used for at- reactor used fuel storage. Used fuel is discharged remotely from Ontario Hydro's reactors to the primary bays for initial storage and cooling. The auxiliary bays are used to receive and store fuel after its initial cooling in the primary bay, and provide additional storage capacity as needed. With on- power fueling of reactors, each reactor of greater than 500 MW(e) net discharges an average of 10 or more used fuel bundles to bay storage every full power day. The logistics of handling such large quantities of used fuel bundles (corresponding to about 300 te/year of uranium for a 4 unit station) present a challenge to designers and operators. The major considerations in used fuel bay design, including site- specific requirements, reliability and quality assurance, are discussed

  15. Independent Power Producers' view on restructuring in Ontario's electric power sector

    International Nuclear Information System (INIS)

    Brooks, J.

    1996-01-01

    The collective views on electricity industry restructuring of the independent power producers in Ontario were summarized by IPPSO's executive director. The Society is fully in agreement with the MacDonald Committee recommendations to privatize power generation in Ontario, and is equally in favor of competitive restructuring that is now underway in Michigan, New York and Quebec, as well as farther afield in the U.S., the U.K., and elsewhere around the world. IPPSO claims that a competitive generation system comprised of current and future IPPSO members could supply the province's power requirements at a cost 20 per cent lower than the present monopolistic system of Ontario Hydro. Add to that no reduction in services to the consumers, increased revenues in the form of taxes to the province, and the prospect of restructuring becomes far less threatening than first perceived. While fully in agreement with the MacDonald Committee's recommendations, IPPSO is opposed to Ontario Hydro's own restructuring plans. Their objection is based on the assessment that the plan would not result in real competition; in reality, it would allow Hydro even greater freedom to continue investing publicly-guaranteed money on a completely dissimilar basis to its competitors

  16. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  17. Multi-objective optimization for integrated hydro–photovoltaic power system

    International Nuclear Information System (INIS)

    Li, Fang-Fang; Qiu, Jun

    2016-01-01

    Highlights: • A model optimizing both quality and quantity of hydro/PV power was proposed. • The dimension was reduced by decoupling hydropower and PV power in time scales. • Reservoir operations have been optimized for different typical hydrological years. • Hydropower was proved to be an ideal compensating resource for PV power in nature. - Abstract: The most striking feature of the solar energy is its intermittency and instability resulting from environmental influence. Hydropower can be an ideal choice to compensate photovoltaic (PV) power since it is easy to adjust and responds rapidly with low cost. This study proposed a long-term multi-objective optimization model for integrated hydro/PV power system considering the smoothness of power output process and the total amount of annual power generation of the system simultaneously. The PV power output is firstly calculated by hourly solar radiation and temperature data, which is then taken as the boundary condition for reservoir optimization. For hydropower, due to its great adjustable capability, a month is taken as the time step to balance the simulation cost. The problem dimension is thus reduced by decoupling hydropower and PV power in time scales. The modified version of Non-dominated Sorting Genetic Algorithm (NSGA-II) is adopted to optimize the multi-objective problem. The proposed model was applied to the Longyangxia hydro/PV hybrid power system in Qinghai province of China, which is supposed to be the largest hydro/PV hydropower station in the world. The results verified that the hydropower is an ideal compensation resource for the PV power in nature, especially in wet years, when the solar radiation decreases due to rainfalls while the water resource is abundant to be allocated. The power generation potential is provided for different hydrologic years, which can be taken to evaluate the actual operations. The proposed methodology is general in that it can be used for other hydro/PV power systems

  18. Ontario Hydro decontamination experience

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, C S; Patterson, R W; Upton, M S [Chemistry and Metallurgy Department, Central Production Services, Ontario Hydro, ON (Canada)

    1991-04-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  19. Ontario Hydro decontamination experience

    International Nuclear Information System (INIS)

    Lacy, C.S.; Patterson, R.W.; Upton, M.S.

    1991-01-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  20. Comparison of hydro-environmental impacts for ebb-only and two-way generation for a Severn Barrage

    Science.gov (United States)

    Ahmadian, Reza; Falconer, Roger A.; Bockelmann-Evans, Bettina

    2014-10-01

    Marine renewable energy is playing an increasing significant role in many parts of the world, mainly due to a rise in the awareness of climate change, and its detrimental effects, and the increasing cost of natural resources. The Severn Estuary, located between South West England and South Wales, has a tidal range of up to 14 m which makes it the second highest tidal range in the world. There are a number of barrage proposals amongst various marine renewable energy schemes proposed to be built in the estuary. The Cardiff-Weston STPG (Severn Tidal Power Group) Barrage, which would be one of the world's largest tidal renewable energy schemes if built, is one of the most publicised schemes to-date. This barrage would generate about 17 TWh/annum of power, which is approximately 5% of the UK's electricity consumption, whilst causing significant hydro-environmental and ecological impact on the estuary. This study mainly focuses on investigating the hydro-environmental impacts of the STPG barrage for the option of two-way generation, and compares this with the commonly investigated option of ebb-only generation. The impacts of the barrage were modelled by implementing a linked 1-D/2-D hydro-environmental model, with the capability of modelling several key environmental processes. The model predictions show that the hydro-environmental impacts of the barrage on the Severn Estuary and Bristol Channel, such as changes in the maximum velocity and reduction in suspended sediment and bacteria levels, were less significant for the two-way generation scheme when compared with the corresponding impacts for ebb-only generation.