WorldWideScience

Sample records for boonsville field fort

  1. Secondary natural gas recovery: Targeted applications for infield reserve growth in midcontinent reservoirs, Boonsville Field, Fort Worth Basin, Texas. Topical report, May 1993--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    Hardage, B.A.; Carr, D.L.; Finley, R.J.; Tyler, N.; Lancaster, D.E.; Elphick, R.Y.; Ballard, J.R.

    1995-07-01

    The objectives of this project are to define undrained or incompletely drained reservoir compartments controlled primarily by depositional heterogeneity in a low-accommodation, cratonic Midcontinent depositional setting, and, afterwards, to develop and transfer to producers strategies for infield reserve growth of natural gas. Integrated geologic, geophysical, reservoir engineering, and petrophysical evaluations are described in complex difficult-to-characterize fluvial and deltaic reservoirs in Boonsville (Bend Conglomerate Gas) field, a large, mature gas field located in the Fort Worth Basin of North Texas. The purpose of this project is to demonstrate approaches to overcoming the reservoir complexity, targeting the gas resource, and doing so using state-of-the-art technologies being applied by a large cross section of Midcontinent operators.

  2. 3D seismic data interpretation of Boonsville Field, Texas

    Science.gov (United States)

    Alhakeem, Aamer Ali

    The Boonsville field is one of the largest gas fields in the US located in the Fort Worth Basin, north central Texas. The highest potential reservoirs reside in the Bend Conglomerate deposited during the Pennsylvanian. The Boonsville data set is prepared by the Bureau of Economic Geology at the University of Texas, Austin, as part of the secondary gas recovery program. The Boonsville field seismic data set covers an area of 5.5 mi2. It includes 38 wells data. The Bend Conglomerate is deposited in fluvio-deltaic transaction. It is subdivided into many genetic sequences which include depositions of sandy conglomerate representing the potential reserves in the Boonsville field. The geologic structure of the Boonsville field subsurface are visualized by constructing structure maps of Caddo, Davis, Runaway, Beans Cr, Vineyard, and Wade. The mapping includes time structure, depth structure, horizon slice, velocity maps, and isopach maps. Many anticlines and folds are illustrated. Karst collapse features are indicated specially in the lower Atoka. Dipping direction of the Bend Conglomerate horizons are changing from dipping toward north at the top to dipping toward east at the bottom. Stratigraphic interpretation of the Runaway Formation and the Vineyard Formation using well logs and seismic data integration showed presence of fluvial dominated channels, point bars, and a mouth bar. RMS amplitude maps are generated and used as direct hydrocarbon indicator for the targeted formations. As a result, bright spots are indicated and used to identify potential reservoirs. Petrophysical analysis is conducted to obtain gross, net pay, NGR, water saturation, shale volume, porosity, and gas formation factor. Volumetric calculations estimated 989.44 MMSCF as the recoverable original gas in-place for a prospect in the Runaway and 3.32 BSCF for a prospect in the Vineyard Formation.

  3. Thin-bed reservoir characterization using integrated three-dimensional seismic and well log data: A case study of the central Boonsville Field, Fort Worth basin, north-central Texas

    Science.gov (United States)

    Xie, Deyi

    This dissertation is designed to resolve two problems using seismic attributes to: (1) delineate thin-bed reservoirs, and (2) distinguish thin-bed sandstone reservoirs from thin-bed non-reservoir carbonates where they appear similar at seismic scale. I evaluated some widely used techniques, developed new approaches for better imaging of thin-bed reservoirs, and found optimal attributes for thin-bed reservoir characterization. These techniques were then tested on the Pennsylvanian Caddo sequence of the Boonsville Field, Texas using public domain data. The main results found through this study are: (1) A new pattern recognition model has been developed to recognize the subtle geological and geophysical features of a thin-bed sequence based on cross-correlation of seismic traces with one or more traces believed to represent specific depositional environments. This algorithm has been proven, via the case study, to be robust and promising in defining seismic facies for subtle geological features and predicting thin-bed reservoirs. (2) Examination of the conventional thin-bed tuning model reveals that it works well only if one single thin-bed is developed or multiple thin beds are widely spaced in the sequence of interest. In other words, the model does not work for multiple closely-spaced thin-beds because of significant destructive interference. (3) A statistical inversion method was developed using the generalized regression neural network (GRNN). For a comparison study, two commercial packages were applied to the Boonsville Field data set. This study shows that all three models were able to identify the thicker reservoir sandstones and non-reservoir limestones. However, the resulting details for the thin beds vary. The GRNN method predicted the thin beds at 13 out of 20 wells with less noise and can be very useful in detecting thin-bed reservoirs in existing fields where a number of wells are available.

  4. Hydrologic data for the East Poplar oil field, Fort Peck Indian Reservation, Northeastern Montana

    Science.gov (United States)

    Thamke, J.N.; Craigg, S.D.; Mendes, T.M.

    1996-01-01

    This report presents selected hydrologic data for the East Poplar oil field, located in the south-central part of the Fort Peck Indian Reservation in northeastern Montana. Data about the occurrence, quantity, and quality of ground and surface water are presented in tabular form. The tables contain records of privately owned wells (active and abandoned), monitoring wells installed by the U.S. Geological Survey and Montana Bureau of Mines and Geology, oil wells, and brine-injection wells; lithologic descriptions of drill cuttings and well-completion data from monitoring wells; data from two aquifer tests conducted in Quaternary alluvial and glacial deposits; chemical quality of ground water; and information on the quantity and chemical quality of surface water. Records of electromagnetic geophysical measurements collected throughout an area of about 20 square miles of the study area are compiled and included on a floppy disk. Illustrations in this report contain information about study area location, site- numbering system, general physical and cultural features, and construction of monitoring wells installed by the U.S. Geological Survey. plate-sized map presents additional information about privately owned wells, monitoring wells, oil wells, brine-injections wells, surface-water data-collection sites, and area of electromagnetic data collection. The data presented in this report provide a base with which to better define and interpret the occurrence, quantity, and quality of ground and surface water in the vicinity of the Poplar River Valley in the south-central part of the Fort Peck Indian Reservation. The data can be used to help delineate the occurrence of brine and saline water in Quaternary alluvial and glacial deposits in the East Poplar oil field.

  5. Hydrogeologic aspects of brine disposal in the East Poplar oil field, Fort Peck Indian Reservation, northeastern Montana

    Energy Technology Data Exchange (ETDEWEB)

    Craigg, S.D.; Thamke, J.N. (Geological Survey, Helena, MT (United States))

    1993-04-01

    The East Poplar Oil Field encompasses about 70 square miles in the south-central part of the Fort Peck Indian Reservation. Oil production began in 1952 from the Mississippian Madison Group. Production depths range from about 5,500 to 6,000 feet below land surface. Large quantities of brine (water having a dissolved-solids concentration greater than 35,000 milligrams per liter) have been produced with the oil. The brine has a dissolved-solids concentration of as much as 160,000 milligrams per liter. Most of the brine has been disposed of by injection into shallower subsurface formations (mainly the Lower Cretaceous Dakota Sandstone at depths of about 3,300 feet and the Upper Cretaceous Judith River Formation at depths of about 1,000 feet). Smaller quantities of brine have been directed to storage and evaporation pits. Handling, transport, and disposal of the brine have resulted in its movement into and migration through shallow Quaternary alluvial and glacial deposits along the Poplar River valley. Locally, domestic water supplies are obtained from these deposits. The major point, sources of shallow ground-water contamination probably is leakage of brine from corroded disposal-well casing and pipelines. Using electromagnetic geophysical techniques and auger drilling, three saline-water plumes in alluvial deposits and one plum in glacial deposits have been delineated. Dominant constituents in plume areas are sodium and chloride, whereas those in nonplume areas are sodium and bicarbonate.

  6. Fort Monroe Historic Viewsheds

    Science.gov (United States)

    2010-08-01

    fort, date unknown (NARA College Park). ................................ 49 Figure 35. Diagram of Fort Monroe (Fort Monroe Cultural Resources...oysters, deer, gulf periwinkle, soft-shell clam, raccoon, beaver, and opossum. Floral material recovered includes hickory nuts and acorns.7 Woodland...Figure 35. Diagram of Fort Monroe (Fort Monroe Cultural Resources). ERDC/CERL SR-10-9 52 Fort Monroe Historic Viewshed Report This page left

  7. Brine delineation and monitoring with electrical resistivity tomography and electromagnetic borehole logging at the Fort Knox well field near West Point, Kentucky

    Science.gov (United States)

    Henderson, Rory; Unthank, Michael D.; Zettwoch, Douglas D.; Lane, John W.

    2010-01-01

    The potable water system at Fort Knox is threatened by brine contamination from improperly abandoned natural gas exploration wells. The Fort Knox well field is located near the town of West Point, Kentucky, in the flood plain of the Ohio River. At the site, unconsolidated sediments approximately 30 – 40 m thick, overlie shale and porous limestone. Brine is believed to flow vertically from the underlying formations to the unconsolidated aquifer through damaged or leaky well casings under a high hydraulic gradient from the artificially pressurized porous limestone, which is utilized for natural gas storage by a regional energy company. Upon reaching the unconsolidated aquifer, brinecontaminated groundwater enters water supply production wells under the pumping‐induced gradient. As part of the Fort Knox remediation strategy to reduce the impact of brine contamination, electrical resistivity tomography (ERT) and borehole electromagnetic (EM) logs are being collected annually to detect gross changes in subsurface conductivity. The 2009 ERT data show areas of high conductivity on the western (contaminated) side of the site with conductivities more than an order of magnitude higher than on the eastern (uncontaminated) side of the site. The areas of high conductivity are interpreted as brine contamination, consistent with known regions of brine contamination. Conductivities from the EM logs are consistent with the results from the ERT inversions. The EM logs show little change between 2008 and 2009, except for some small changes in the brine distribution in well PZ1. Yearly ERT surveys will be continued to detect new areas of brine contamination and monitor the remediation effort.

  8. Field Testing and Load Rating Report for Bridge No. 4, Hybrid Composite Beam Span, at Fort Knox, Kentucky

    Science.gov (United States)

    2016-09-01

    encased in a glass fiber reinforced polymer (GFRP) shell; and were made composite with a reinforced concrete deck through the use of a concrete fin and...very thin GFRP shell walls. In reality, the shear deformation of the GFRP walls likely occurred slightly independent of the concrete arch and deck... concrete fin. This additional shear strength was likely due to the GFRP shell’s ability to exhibit post- buckling (tension field) behavior and enhanced

  9. Fortæller

    DEFF Research Database (Denmark)

    Larsen, Gorm

    2012-01-01

    Siden Gerard Genettes ”Discours du récit” (1972) er distinktionen mellem hvem, der taler, og hvem, der ser, blevet cementeret som et grundparadigme i narratologien og litteraturteorien. Genettes pointe var, at den etablerede narrative teori – som fx Wayne C. Booths The Rhetoric of Fiction (1961...... narratologi blevet forsøgt udfordret, enten fordi det hævdes, at en tekst ikke nødvendigvis er udstyret med en fortæller, eller fordi begrebet om fortæller antages at bero på en misvisende og reduktiv antropomorficering. Eller omvendt fordi der i Genettes begrebsdannelse ligger en forkastelse af...... forestillingen om en implicit forfatter (implied author) og dermed også en afvisning af en upålidelige fortæller. Kapitlet præsenterer begreberne fortæller og synsvinkel i narratologien med afsæt i Genettes bestemmelser og diskutere de problemer, der opstår i kølvandet herpå. Det være sig både de rent...

  10. FORT UNION DEEP

    Energy Technology Data Exchange (ETDEWEB)

    Lyle A. Johnson Jr.

    2002-03-01

    Coalbed methane (CBM) is currently the hottest area of energy development in the Rocky Mountain area. The Powder River Basin (PRB) is the largest CBM area in Wyoming and has attracted the majority of the attention because of its high permeability and relatively shallow depth. Other Wyoming coal regions are also being targeted for development, but most of these areas have lower permeability and deeper coal seams. This project consists of the development of a CBM stimulation system for deep coal resources and involves three work areas: (1) Well Placement, (2) Well Stimulation, and (3) Production Monitoring and Evaluation. The focus of this project is the Washakie Basin. Timberline Energy, Inc., the cosponsor, has a project area in southern Carbon County, Wyoming, and northern Moffat County, Colorado. The target coal is found near the top of the lower Fort Union formation. The well for this project, Evans No.1, was drilled to a depth of 2,700 ft. Three coal seams were encountered with sandstone and some interbedded shale between seams. Well logs indicated that the coal seams and the sandstone contained gas. For the testing, the upper seam at 2,000 ft was selected. The well, drilled and completed for this project, produced very little water and only occasional burps of methane. To enhance the well, a mild severity fracture was conducted to fracture the coal seam and not the adjacent sandstone. Fracturing data indicated a fracture half-length of 34 ft, a coal permeability of 0.2226 md, and permeability of 15.3 md. Following fracturing, the gas production rate stabilized at 10 Mscf/day within water production of 18 bpd. The Western Research Institute (WRI) CBM model was used to design a 14-day stimulation cycle followed by a 30-day production period. A maximum injection pressure of 1,200 psig to remain well below the fracture pressure was selected. Model predictions were 20 Mscf/day of air injection for 14 days, a one-day shut-in, then flowback. The predicted flowback

  11. FORT UNION DEEP

    Energy Technology Data Exchange (ETDEWEB)

    Lyle A. Johnson Jr.

    2002-09-01

    Coalbed methane (CBM) is currently the hottest area of energy development in the Rocky Mountain area. The Powder River Basin (PRB) is the largest CBM area in Wyoming and has attracted the majority of the attention because of its high permeability and relatively shallow depth. Other Wyoming coal regions are also being targeted for development, but most of these areas have lower permeability and deeper coal seams. This project consists of the development of a CBM stimulation system for deep coal resources and involves three work areas: (1) Well Placement, (2) Well Stimulation, and (3) Production Monitoring and Evaluation. The focus of this project is the Washakie Basin. Timberline Energy, Inc., the cosponsor, has a project area in southern Carbon County, Wyoming, and northern Moffat County, Colorado. The target coal is found near the top of the lower Fort Union formation. The well for this project, Evans No.1, was drilled to a depth of 2,700 ft. Three coal seams were encountered with sandstone and some interbedded shale between seams. Well logs indicated that the coal seams and the sandstone contained gas. For the testing, the upper seam at 2,000 ft was selected. The well, drilled and completed for this project, produced very little water and only occasional burps of methane. To enhance the well, a mild severity fracture was conducted to fracture the coal seam and not the adjacent sandstone. Fracturing data indicated a fracture half-length of 34 ft, a coal permeability of 0.2226 md, and permeability of 15.3 md. Following fracturing, the gas production rate stabilized at 10 Mscf/day within water production of 18 bpd. The Western Research Institute (WRI) CBM model was used to design a 14-day stimulation cycle followed by a 30-day production period. A maximum injection pressure of 1,200 psig to remain well below the fracture pressure was selected. Model predictions were 20 Mscf/day of air injection for 14 days, a one-day shut-in, then flowback. The predicted flowback

  12. Rapid Fielding: Case Study Concerning the Fielding of the Multiple Launch Rocket System (MLRS) M270A1 to 2d Battalion 4th Field Artillery Fort Sill, Oklahoma

    National Research Council Canada - National Science Library

    Saiz, Evangeline M

    2006-01-01

    .... This case study investigates one aspect of Army Transformation, accelerated fielding, to determine whether the Army's materiel fielding program properly supports rapidly fielding of essential major...

  13. Implementation of resource recovery guidelines at Fort Meade, Fort Lewis, and Fort Sill. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Donahue, B.A.; Kraybill, D.D.; Mitchell, G.; Smith, M.; Deminco, P.

    1979-07-01

    This report documents the attempt to implement requirements of the 'Source Separation for Materials Recovery Guidelines' at Fort Meade, MD. These guidelines, one of six U.S. Environmental Protection Agency Solid Waste Management Guidelines, are primarily concerned with the source separation of high-grade paper, newspaper, and corrugated paper. The information obtained from the implementation at Fort Meade was compared with voluntary recycling programs at Fort Sill, OK, and Fort Lewis, WA. Extensive economic analysis at Fort Meade indicated that 'full' implementation of the program for cardboard at points of high generation was deemed economically feasible. The investigations at Fort Sill and Fort Lewis indicated that two key items are essential for successfully implementing voluntary resource recovery programs at installations: (1) interest in and understanding of the program by installation personnel at a meaningful level, and (2) public interest and motivation, maintained through an innovative incentive program. Another reason the programs at Forts Sill and Lewis were successful was because the labor was voluntary.

  14. Fort Carson Wind Resource Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, R.

    2012-10-01

    This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

  15. Archive of post-Hurricane Charley coastal oblique aerial photographs collected during U.S. Geological Survey field activity 04CCH01 from Marco Island to Fort DeSoto, Florida, August 15, 2004

    Science.gov (United States)

    Subino, Janice A.; Morgan, Karen L.M.; Krohn, M. Dennis; Miller, Gregory K.; Dadisman, Shawn V.; Forde, Arnell S.

    2012-01-01

    On August 15, 2004, the U.S. Geological Survey (USGS) conducted an oblique aerial photographic survey off the southwest coast of Florida, from Marco Island to Fort DeSoto, aboard a Navajo Chieftain airplane, tail number N2KK, at an altitude of 500 ft and approximately 1000 ft offshore. These photographs were used to document coastal changes such as beach erosion and overwash caused by Hurricane Charley. They will also be used as baseline data for future coastal change. The oblique photography also served as qualitative ground truthing for the Experimental Advanced Airborne Research Lidar (EAARL) coastal topography and bathymetry data collected on August 16, 2004 (Bonisteel and others, 2009). This report serves as an archive of photographs collected during the August 15, 2004, post-Hurricane Charley coastal oblique aerial survey along with associated flight path maps, KML files, navigation files, digital Field Activity Collection System (FACS) logs, and Federal Geographic Data Committee (FGDC) metadata. Refer to the Acronyms page for expansions of all acronyms and abbreviations used in this report.

  16. 33 CFR 100.736 - Annual Fort Myers Beach air show; Fort Myers Beach, FL.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Annual Fort Myers Beach air show; Fort Myers Beach, FL. 100.736 Section 100.736 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... Fort Myers Beach air show; Fort Myers Beach, FL. (a)(1) Regulated Area. The regulated area is formed by...

  17. Climate Change Impacts on Fort Bragg, NC

    Science.gov (United States)

    2013-10-15

    may remain a common resident at Fort Bragg ................. 57 B12 Fort Bragg is currently on the edge of the range of the Pond pine (Pinus...Forest migration changes near Fort Bragg. Ranges likely to increase to better include Fort Bragg: Loblolly bay Longleaf pine Pond pine Loblolly...various model scenario combinations while the most significant mini - mums are set by the A1B/giss_model_er arrangement. ERDC/CERL TR-13-22 45 Figure

  18. Construction experience on PCRV liners at Fort St. Vrain

    International Nuclear Information System (INIS)

    Cliff, J.O.; Wunderlich, R.G.

    1976-01-01

    The construction of the steel liners for the Fort St. Vrain prestressed concrete reactor vessel presented many unique problems for which techniques were developed to satisfy the rigid specification requirements. The PCRV cavity liner was fabricated from 1.9cm carbon steel plate. The liners were partially fabricated by Pittsburgh-Des Moines Steel Company at their Pittsburgh manufacturing facility. The liners were then shipped by rail to within approximately five miles of the jobsite and then trucked the remaining distance. The construction techniques, dimensional control, concrete support and testing utilized on the Fort St. Vrain project are presented in detail and demonstrate the flexibility of the PCRV for field construction. (author)

  19. Delineation of brine contamination in and near the East Poplar oil field, Fort Peck Indian Reservation, northeastern Montana, 2004-09

    Science.gov (United States)

    Thamke, Joanna N.; Smith, Bruce D.

    2014-01-01

    The extent of brine contamination in the shallow aquifers in and near the East Poplar oil field is as much as 17.9 square miles and appears to be present throughout the entire saturated zone in contaminated areas. The brine contamination affects 15–37 billion gallons of groundwater. Brine contamination in the shallow aquifers east of the Poplar River generally moves to the southwest toward the river and then southward in the Poplar River valley. The likely source of brine contamination in the shallow aquifers is brine that is produced with crude oil in the East Poplar oil field study area. Brine contamination has not only affected the water quality from privately owned wells in and near the East Poplar oil field, but also the city of Poplar’s public water-supply wells. Three water-quality types characterize water in the shallow aquifers; a fourth water-quality type in the study area characterizes the brine. Type 1 is uncontaminated water that is suitable for most domestic purposes and typically contains sodium bicarbonate and sodium/magnesium sulfate as the dominant ions. Type 2 is moderately contaminated water that is suitable for some domestic purposes, but not used for drinking water, and typically contains sodium and chloride as the dominant ions. Type 3 is considerably contaminated water that is unsuitable for any domestic purpose and always contains sodium and chloride as the dominant ions. Type 3 quality of water in the shallow aquifers is similar to Type 4, which is the brine that is produced with crude oil. Electromagnetic apparent conductivity data were collected in the 106 square-mile area and used to determine extent of brine contamination. These data were collected and interpreted in conjunction with water-quality data collected through 2009 to delineate brine plumes in the shallow aquifers. Monitoring wells subsequently were drilled in some areas without existing water wells to confirm most of the delineated brine plumes; however, several possible

  20. Electron gas interacting in a metal, submitted to a strong magnetic field; Gas de eletrons interagentes num metal, sujeito a um campo magnetico forte

    Energy Technology Data Exchange (ETDEWEB)

    Alcaraz, Francisco Castilho

    1977-07-01

    Using the propagator's technique in the grand ensemble developed by Montroll and Ward we investigate the magnetic properties of an interacting electron gas in a strong magnetic field. The free propagator properly constructed shows that the spin paramagnetism does not have a term with strong temperature dependence, contrary to the result of Isihara. Considering the electron density to be constant, the dHVA oscillations in the magnetic susceptibility and sound velocity, considering the effects of first exchange interactions, show only one phase in agreement with experimental result, while Ichimura and Isihara obtained two phases differing by {pi}/2. The effects of first order exchange interactions in the dHVA oscillations of the magnetic susceptibility and sound velocity give rise to an exponential factor in the amplitudes of oscillator (Dingle factor), being the Dingle temperature linearly dependent of the Fermi velocity. The calculations of the ring diagram contribution to the grand partition function, show that the approximation used by Isihara for this calculations is not good and the dHVA oscillations of the contributions from the ring diagrams for the grand partition function have a phase differing by {pi}/2 from that obtained by Isihara. (author)

  1. Environmental Assessment: Fort Greely Installation, Fort Greely, Alaska

    Science.gov (United States)

    2005-04-18

    4-36 4.19 Natural or Depletable Resource Requirements and Conservation Potential .... 4-36 4.20 Federal Actions To Address Protection of Children ...Dominant tree species are black spruce, aspen, and balsam poplar. The understory and groundcover consist of mountain cranberry and bog blueberry ...during emergencies (Lee, 2005). The nearest hospital, Fairbanks Memorial , is located approximately 100 miles away. 3-20 Fort Greely Installation EA

  2. Fort Collins Science Center-Fiscal year 2009 science accomplishments

    Science.gov (United States)

    Wilson, Juliette T.

    2010-01-01

    Public land and natural resource managers in the United States are confronted with increasingly complex decisions that have important ramifications for both ecological and human systems. The scientists and technical professionals at the U.S. Geological Survey Fort Collins Science Center?many of whom are at the forefront of their fields?possess a unique blend of ecological, socioeconomic, and technological expertise. Because of this diverse talent, Fort Collins Science Center staff are able to apply a systems approach to investigating complicated ecological problems in a way that helps answer critical management questions. In addition, the Fort Collins Science Center has a long record of working closely with the academic community through cooperative agreements and other collaborations. The Fort Collins Science Center is deeply engaged with other U.S. Geological Survey science centers and partners throughout the Department of the Interior. As a regular practice, we incorporate the expertise of these partners in providing a full complement of ?the right people? to effectively tackle the multifaceted research problems of today's resource-management world. In Fiscal Year 2009, the Fort Collins Science Center's scientific and technical professionals continued research vital to Department of the Interior's science and management needs. Fort Collins Science Center work also supported the science needs of other Federal and State agencies as well as non-government organizations. Specifically, Fort Collins Science Center research and technical assistance focused on client and partner needs and goals in the areas of biological information management and delivery, enterprise information, fisheries and aquatic systems, invasive species, status and trends of biological resources (including human dimensions), terrestrial ecosystems, and wildlife resources. In the process, Fort Collins Science Center science addressed natural-science information needs identified in the U

  3. Evaluation of Eurasian Watermilfoil Control Techniques Using Aquatic Herbicides in Fort Peck Lake, Montana

    Science.gov (United States)

    2015-07-01

    Herbicides in Fort Peck Lake, Montana En vi ro nm en ta l L ab or at or y Toni G. Pennington, Kurt D. Getsinger, John G. Skogerboe, and Patricia L...Using Aquatic Herbicides in Fort Peck Lake, Montana Toni G. Pennington Tetra Tech, Inc. 1020 SW Taylor St., Suite 530 Portland, OR 97205 Kurt D...Omaha Omaha, NE 68102 ERDC/EL TR-15-6 ii Abstract In 2012, field trials were conducted in Fort Peck Lake to evaluate herbicides for

  4. Fort Drum integrated resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program's (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk's primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  5. Renewable Energy Opportunities at Fort Hood, Texas

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Warwick, William M.; Orrell, Alice C.; Russo, Bryan J.; Parker, Kyle R.; Weimar, Mark R.; Horner, Jacob A.; Manning, Anathea

    2011-11-14

    This report presents the results of Pacific Northwest National Laboratory's (PNNL) follow-on renewable energy (RE) assessment of Fort Hood. Fort Hood receives many solicitations from renewable energy vendors who are interested in doing projects on site. Based on specific requests from Fort Hood staff so they can better understand these proposals, and the results of PNNL's 2008 RE assessment of Fort Hood, the following resources were examined in this assessment: (1) Municipal solid waste (MSW) for waste-to-energy (WTE); (2) Wind; (3) Landfill gas; (4) Solar photovoltaics (PV); and (5) Shale gas. This report also examines the regulatory issues, development options, and environmental impacts for the promising RE resources, and includes a review of the RE market in Texas.

  6. Fort Davis National Historic Site : acoustical monitoring

    Science.gov (United States)

    2013-06-01

    During the summer of 2010 (September - October 2010), the Volpe Center collected baseline acoustical data at Fort Davis National Historic Site (FODA)at two sites deployed for approximately 30 days each. The baseline data collected during this period ...

  7. 76 FR 43958 - Safety Zone; Rotary Club of Fort Lauderdale New River Raft Race, New River, Fort Lauderdale, FL

    Science.gov (United States)

    2011-07-22

    ..., design, or operation; test methods; sampling procedures; and related management systems practices) that...-AA00 Safety Zone; Rotary Club of Fort Lauderdale New River Raft Race, New River, Fort Lauderdale, FL... Tunnel, in Fort Lauderdale, Florida during the Rotary Club of Fort Lauderdale New River Raft Race. The...

  8. 76 FR 62301 - Safety Zone; Rotary Club of Fort Lauderdale New River Raft Race, New River, Fort Lauderdale, FL

    Science.gov (United States)

    2011-10-07

    ... management systems practices) that are developed or adopted by voluntary consensus standards bodies. This...-AA00 Safety Zone; Rotary Club of Fort Lauderdale New River Raft Race, New River, Fort Lauderdale, FL... Fort Lauderdale, Florida during the Rotary Club of Fort Lauderdale New River Raft Race. The race is...

  9. Fortællinger fra praksis

    DEFF Research Database (Denmark)

    Fortællinger fra praksis formidler erfaringer fra et udviklingsprojekt, hvor pædagoger sætter fokus på børns og brugeres livshistorier. En livshistorie er en dynamisk størrelse under stadig forandring og konstruktion. Vi fortæller historier om vores liv på den måde, det giver mening for os her og...

  10. Controls on Mannville coalbed methane production in Fort Assiniboine, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    Bearinger, D.; Majcher, M. [Nexen Inc., Calgary, AB (Canada)

    2010-07-01

    A horizontal well exploitation scheme is being used in the Fort Assiniboine field in central Alberta to produce coalbed methane (CBM) from the under-saturated coals of the Mannville Formation. The Mannville coal seams in this region are under-saturated. In order to improve permeability to gas within the fracture system and achieve economic gas production rates, the reservoir's ability to dewater the coal through the fracture fabric to establish a gas phase is key. Across the field, a wide range of production rates can be found. A study was conducted to collect field wide data from core, wells, geological and geophysical mapping and production data in order to determine the major controls on gas production rates. The paper discussed the compilation of wellbore parameters, including borehole orientation and length; wellbore configuration; and production data. It also discussed the characterization of reservoir parameters such as reservoir thickness; structure; stress; and reservoir quality. It was concluded that the main controls on Mannville CBM production in the Fort Assiniboine field are coal seam thickness, effective stress, coal quality and face cleat exposure. 5 refs., 14 figs.

  11. FORTE spacecraft vibration mitigation. Final report

    International Nuclear Information System (INIS)

    Maly, J.R.

    1996-02-01

    This report documents work that was performed by CSA Engineering, Inc., for Los Alamos National Laboratory (LANL), to reduce vibrations of the FORTE spacecraft by retrofitting damped structural components into the spacecraft structure. The technical objective of the work was reduction of response at the location of payload components when the structure is subjected to the dynamic loading associated with launch and proto-qualification testing. FORTE is a small satellite that will be placed in orbit in 1996. The structure weighs approximately 425 lb, and is roughly 80 inches high and 40 inches in diameter. It was developed and built by LANL in conjunction with Sandia National Laboratories Albuquerque for the United States Department of Energy. The FORTE primary structure was fabricated primarily with graphite epoxy, using aluminum honeycomb core material for equipment decks and solar panel substrates. Equipment decks were bonded and bolted through aluminum mounting blocks to adjoining structure

  12. Renewable Energy Opportunities at Fort Polk, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Boyd, Brian K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Horner, Jacob A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gorrissen, Willy J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Orrell, Alice C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weimar, Mark R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hand, James R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Russo, Bryan J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williamson, Jennifer L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2010-11-17

    This document provides an overview of renewable resource potential at Fort Polk, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Polk took place on February 16, 2010.

  13. Renewable Energy Opportunities at Fort Sill, Oklahoma

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Brian K.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

    2011-03-31

    This document provides an overview of renewable resource potential at Fort Sill, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Sill took place on June 10, 2010.

  14. Die geskiedenis van die saw gedenkteken te Fort Klapperkop ...

    African Journals Online (AJOL)

    Die SAW Gedenkteken se lotgevalle is nou verbonde aan die van die. Militere Museum Fort Klapperkop aangesien die Gedenkteken op die terrein van Fort Klapperkop opgerig is. Weens rasionalisasie is die voortbestaan van Fort Klapperkop Museum onseker. Dit plaas ongetwyfeld dan ook 'n vraagteken agter die ...

  15. 78 FR 4356 - Proposed Modification of the Dallas/Fort Worth Class B Airspace Area; TX

    Science.gov (United States)

    2013-01-22

    ... Dallas/Fort Worth International Airport (DFW) and Dallas Love Field Airport (DAL) within Class B airspace... action on the proposed rule. The proposal contained in this action may be changed in light of comments... describes the application procedure. Background In 1973, the FAA issued a final rule (38 FR 13635) which...

  16. FORT NAMUTONI: FROM MILITARY STRONGHOLD TO TOURIST ...

    African Journals Online (AJOL)

    STRONGHOLD TO TOURIST CAMP. Col Dr Jan Ploeger*. "... this fortress was not just a white elephant, it was actually occupied and played a major role in the settlement of Germans in the far North." (own translation) - D.W. Krynauw Die Verhaal van. Namutoni, p 3. Introduction. Fort Namutoni, the last White outpost east of ...

  17. Fort St. Vrain operations and future

    International Nuclear Information System (INIS)

    Brey, H.L.

    1991-01-01

    June 1989 resulted in the highest electric generation month in the history of the Fort St. Vrain plant. This culminated an excellent operating period involving the first half of 1988. The plant was then shutdown in July on a scheduled outage to make repairs in the main steam drive section of all of the helium circulators. This outage was significantly extended due to problems with moisture ingress into the primary coolant felt to be primarily from the core support floor section of the liner cooling system. 1989 also marks the 10th Anniversary of Fort St. Vrain as a commercial nuclear power plant. Electrical generation from this plant throughout this period has not been good, generally because of the prototypical nature of key plant components, primarily the helium circulators. Also, throughout this period there has been substantial increase in operations, maintenance, and fuel costs which could not be offset by the sale of electricity from the plant. This led to the decision to shutdown Fort St. Vrain permanently on or before June 30, 1990. The lessons learned and operational experiences from Fort St. Vrain have been substantial for the development of the Gas-Cooled Reactor Program and in achieving a safe, commercially viable plant design for the MHTGR. Superb fuel performance has not only provided a radiologically clean plant, but has achieved significant safety attributes in the licensing of the MHTGR. Equipment performance for Fort St. Vrain on key components and systems such as the steam generators, purification system control rod drives, and many others has been factored into the design of the MHTGR. Additional benefits are anticipated as the plant completes its operating phase and goes through defueling and decommissioning. As primary system components become available and are physically evaluated, further valuable data will be secured for the benefit of the MHTGR. (author)

  18. 77 FR 74870 - Notice of Inventory Completion: U.S. Department of Defense, Army, Fort Sill Museum, Fort Sill, OK...

    Science.gov (United States)

    2012-12-18

    ..., Fort Sill, OK, and Museum of the Great Plains, Lawton, OK AGENCY: National Park Service, Interior... Sill National Historic Landmark and Museum, U.S. Army Fires Center of Excellence, Fort Sill, OK 73503... Great Plains. The human remains were removed from Fort Sill, Comanche County, OK. This notice is...

  19. Von Braun Rocket Team at Fort Bliss, Texas

    Science.gov (United States)

    1940-01-01

    The German Rocket Team, also known as the Von Braun Rocket Team, poses for a group photograph at Fort Bliss, Texas. After World War II ended in 1945, Dr. Wernher von Braun led some 120 of his Peenemuende Colleagues, who developed the V-2 rocket for the German military during the War, to the United Sttes under a contract to the U.S. Army Corps as part of Operation Paperclip. During the following five years the team worked on high altitude firings of the captured V-2 rockets at the White Sands Missile Range in New Mexico, and a guided missile development unit at Fort Bliss, Texas. In April 1950, the group was transferred to the Army Ballistic Missile Agency (ABMA) at Redstone Arsenal in Huntsville, Alabama, and continued to work on the development of the guided missiles for the U.S. Army until transferring to a newly established field center of the National Aeronautic and Space Administration (NASA), George C. Marshall Space Flight Center (MSFC).

  20. Fotografiske fortællinger fra SFO

    DEFF Research Database (Denmark)

    Rasmussen, Kim

    2008-01-01

    En artikel om børns fotos og fortællinger fra et udviklingsprojekt på nogle SFOer, hvor børn har fotograferet noget af det, de er optaget af. Artiklen beretter om nogle af de potentialer og muligheder, der ligger i visualisering integreret i pædagogisk praksis. Udgivelsesdato: september......En artikel om børns fotos og fortællinger fra et udviklingsprojekt på nogle SFOer, hvor børn har fotograferet noget af det, de er optaget af. Artiklen beretter om nogle af de potentialer og muligheder, der ligger i visualisering integreret i pædagogisk praksis. Udgivelsesdato: september...

  1. Enhanced Preliminary Assessment Fort Devens, Massachusetts

    Science.gov (United States)

    1992-04-30

    appearance. Malathion, Warfarin , Diazinon, Carbaryl, Bromacil, 2,4-D, and Pyrythrum were identified in 1977 (Nicholls et al., 1980) as the pesticides...entitled, "What You Can Do To Protect Your ’amily Against Possible Lead Poisoning ," (Enclosure) provides you rith important information about the lead...YOU CAN DO TO PROTECT YOUR FAMILY AGAINST POSSIBLE LEAD POISONING CURRENT SITUATION: The quarters on Fort Devens have been painted with non-lead paint

  2. Renewable Energy Opportunities at Fort Hood, Texas

    Energy Technology Data Exchange (ETDEWEB)

    Chvala, William D.; Warwick, William M.; Dixon, Douglas R.; Solana, Amy E.; Weimar, Mark R.; States, Jennifer C.; Reilly, Raymond W.

    2008-06-30

    The document provides an overview of renewable resource potential at Fort Hood based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 DoD Renewables Assessment. This effort focuses on grid-connected generation of electricity from renewable energy sources and also ground source heat pumps for heating and cooling buildings, as directed by IMCOM.

  3. Study of hydrogenated amorphous silicon devices under intense electric field: application to nuclear detection; Etude de dispositifs electroniques en silicium amorphe hydrogene sous fort champ electrique: application a la detection nucleaire

    Energy Technology Data Exchange (ETDEWEB)

    Ilie, A. [CEA Centre d`Etudes de Saclay, 91 - Gif-sur-Yvette (France). Direction des Technologies Avancees]|[Paris-11 Univ., 91 - Orsay (France)

    1996-12-31

    The goal of this work was the study, development and optimization of hydrogenated amorphous silicon (a-Si:H) devices for use in detection of ionizing radiation. Thick p-i-n devices, capable of withstanding large electric fields (up to 10{sup 6} V/cm) with small currents (nA/cm{sup 2}), were developed. To decrease fabrication time, films were made using the `He diluted` PECVD process and compared to standard a-Si:H films. Aspects connected to specific detector applications as well as to the fundamental physics of a-Si:H were considered: the internal electric field technique, in which the depletion charge was measured as a function of the applied bias voltage; study of the leakage current of p-i-n devices permitted us to demonstrate different regimes: depletion, field-enhanced thermal generation and electronic injection across the p layer. The effect of the electric field on the thermal generation of the carriers was studied considering the Poole-Frenkel and tunneling mechanisms. A model was developed taking under consideration the statistics of the correlated states and electron-phonon coupling. The results suggest that mechanisms not included in the `standard model` of a Si:h need to be considered, such as defect relaxation, a filed-dependent mobility edge etc...; a new metastable phenomenon, induced by prolonged exposure to a strong electric field, was observed and studied. It is characterized by marked decrease of the leakage current and the detector noise, and increase in the breakdown voltage, as well as an improvement of carrier collection efficiency. This forming process appears to be principally due to an activation of the dopants in the p layer; finally, the capacity of thick p-i-n a Si:H devices to detect ionizing radiation has been evaluated. We show that it is possible, with 20-50 micron thick p-i-n devices, to detect the full spectrum of alpha and beta particles. With an appropriate converter, neutron detection then becomes possible. (author). 137 refs.

  4. Hazardous Waste Cleanup: General Electric - Fort Edward in Fort Edward, New York

    Science.gov (United States)

    This 32-acre General Electric (GE) facility is located approximately 800 feet east of the Hudson River between the Villages of Fort Edward to the south and Hudson Falls to the north. A 200-foot-wide parcel west of the main portion of the site, between Alle

  5. 33 CFR 100.717 - Annual Fort Myers Beach Offshore Grand Prix; Fort Myers, FL.

    Science.gov (United States)

    2010-07-01

    ... involved with the Fort Myers Beach Offshore Grand Prix, exiting Big Carlos Pass between 11 a.m. and 3 p.m... seaward of the seaside legs of the racecourse at all times in the spectator areas defined in paragraph (b...

  6. Fort Mason Center: Pier 2 Project

    Energy Technology Data Exchange (ETDEWEB)

    Nester, Patrick [Fort Mason Center, San Francisco, CA (United States)

    2014-08-30

    The rooftop Photovoltaic (PV) panels and radiant piping project was constructed by Fort Mason Center as part of its $21 million comprehensive rehabilitation of the Pier 2 shed which include the shed’s electrical, natural gas and water systems. Fort Mason Center improved performance while reducing energy and water usage and costs to demonstrate the efficiencies and opportunities available to large multi-function facilities. The scalable demand of these facilities required a layered approach to conservation, control and production. The project employed a comprehensive retrofit of electrical natural gas, and plumbing systems to maximize efficiency and lower carbon footprint specifically to demonstrate the effectiveness of these strategies in a public setting with varied and diverse use. The project was completed in July 2014 and met the expected outcomes regarding increased comfort and operational efficiency throughout the Pier 2 shed as well as on site electrical generation of current consumption. The entire Pier 2 shed project won a 2015 California Preservation Foundation design award for historic rehabilitation.

  7. Status of the Fort St. Vrain decommissioning

    International Nuclear Information System (INIS)

    Fisher, M.J.

    1990-01-01

    Fort St. Vrain is a high temperature gas cooled reactor. It has been shut down as a result of financial and technical difficulties. Fort St. Vrain has been planning for defueling and decommissioning for at least three years. The preliminary decommissioning plan, in accordance with the NRC's final rule, has been submitted and is being reviewed by the NRC. The basis of the preliminary decommissioning plan has been SAFSTOR. Public Service Company, who is the owner and operator of FSV, is scheduled to submit a proposed decommissioning plan to the NRC in the fourth quarter of 1990. PSC has gone out for bid on the decontamination and dismantlement of FSV. This paper includes the defueling schedule, the independent spent fuel storage installation status, the probability of shipping fuel to DOE, the status of the preliminary decommissioning plan submittal, the issuance of a possession only license and what are the results of obtaining this license amendment, preliminary decommissioning activities allowed prior to the approval of a proposed decommissioning plan, the preparation of a proposed decommissioning plan and the status of our decision to proceed with SAFSTOR or DECON as identified in the NRC's final decommissioning rule

  8. Methodology for the evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, P.J.; Shonder, J.A.; White, D.L.; Huang, H.L.

    1998-03-01

    The US Army and a private energy service company are developing a comprehensive energy efficiency project to upgrade the family housing at Fort Polk, Louisiana. The project includes converting the space conditioning systems of more than 4,000 housing units to geothermal (or ground-source) heat pumps (GHPs). This interim report describes the methodology of the evaluation associated with this project, including the field monitoring that has been conducted at the base.

  9. 76 FR 68625 - Establishment of the Fort Monroe National Monument

    Science.gov (United States)

    2011-11-07

    ... period of slavery in the colonies and, later, this Nation. Two hundred and forty-two years later, Fort... 1863. Thus, Old Point Comfort marks both the beginning and end of slavery in our Nation. The Fort... North Beach area lies the only undeveloped shoreline remaining on Old Point Comfort, providing modern...

  10. The Fort Smith radioactive belt, Northwest Territories

    International Nuclear Information System (INIS)

    Charbonneau, B.W.

    1980-01-01

    The Fort Smith Belt is an elongate zone, about 200 km x 50 km, extending from the East Arm of Great Slave Lake southerly into northeastern Alberta. The major feature of the belt is that it is one of the most radioactive regions so far recognized in the Canadian Shield. Potassium, uranium, and thorium are all enriched but the greatest increase is in thorium. The dominant rock type underlying the area is a foliated porphyritic granite. This rock contains an average of about 80 ppm thorium (with areas of tens of square kilometres containing up to 200 ppm) and approximately 11 ppm uranium. In places, dark elongate zones rich in biotite, apatite, and opaque minerals within the porphyritic granite may contain an order of magnitude more uranium and thorium than the porphyry. Radioactive minerals within both the porphyry and the dark zones are principally monazite (containing up to 16% ThO 2 ) and isolated grains of uraninite. This foliated porphyritic granite is interpreted as being pre- or syntectonic with respect to the Hudsonian event because its foliation parallels that of the surrounding rocks. There has been subsequent deformation. The second characteristic feature of the Fort Smith Belt is the development of a peripheral zone where eU is enriched relative to eTh correlating mainly with granitoid rocks which surround the thorium-rich area and wherein ratios of eU/eTh exceed 1:2 (compared to the crustal average of 1:4). Uranium may have moved laterally into this marginal area from the thorium-rich porphyry, possibly in a vapour phase. There is a possibility that concentrations of uranium as well as other metals such as Cu, Mo, Zn, Sn, and W could exist in the porphyry and its margin in appropriate chemical and/or structural traps. The radioactive granite rocks of the Fort Smith Belt are adjacent to uranium-thorium occurrences in the nearby Proterozoic Nonacho sediments but whether or not a genetic relationship exists between the two situations is uncertain. (auth)

  11. Master environmental plan for Fort Devens, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. (Argonne National Lab., IL (United States). Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  12. Fort St. Vrain defueling ampersand decommissioning considerations

    International Nuclear Information System (INIS)

    Warembourg, D.

    1994-01-01

    Fort St. Vrain Nuclear Generating Station (FSV) is one of the first commercial reactors to be decommissioned under NRC's decommissioning rule. The defueling and decommissioning of this 330 MWe High Temperature Gas Cooled Reactor (HTGR) has involved many challenges for Public Service Company of Colorado (PSC) including defueling to an Independent Spent Fuel Storage Installation (ISFSI), establishing decommissioning funding, obtaining regulatory approvals, arranging for waste disposal, and managing a large fixed price decommissioning contract. In 1990, a team comprised of the Westinghouse Corporation and Morrison Knudsen Corporation, with the Scientific Ecology Group as a major subcontractor, was contracted by PSC to perform the decommissioning under a fixed price contract. Physical work activities began in August 1992. Currently, physical dismantlement activities are about 45% complete, the project is on schedule, and is within budget

  13. Operational experience at Fort St. Vrain

    International Nuclear Information System (INIS)

    Bramblett, G.C.; Fisher, C.R.; Swart, F.E.

    1981-01-01

    The Fort St. Vrain (FSV) station, a 330-MW(e) single reheat steam cycle powered by a high-temperature gas-cooled reactor (HTGR), is the first HTGR to enter commercial operation. Designed and built by General Atomic Company (GA), the plant is owned and operated by Public Service Company of Colorado (PSC). Many unique design features have been incorporated into this reactor system, including high-pressure helium as the primary system coolant, a graphite-moderated prismatic block core design, fission-product-containing carbide coatings on both fissile and fertile fuel particles, steam-driven helium circulators turning on water bearings, and once-through steam generators. All of these systems are contained in a prestressed concrete reactor vessel (PCRV). Extensive testing has been conducted during the rise to power following first criticality early in 1974 to verify system design performance. During this period, the plant has operated at power levels up to 70% and produced over one billion kilowatt hours of electricity. In 1979, the first refueling was conducted in conjunction with an extensive in-core inspection, the addition of in-core instrumentation, and a planned removal of a circulator for inspection. Later in the year, a scheduled shutdown was undertaken for surveillance tests, insertion of core region constraint devices (RCDs), and other maintenance. Fort St. Vrain has encountered problems of the type that would be expected in a first-of-a-kind system. The plant is currently restricted to 70% of design power by the Nuclear Regulatory Commission (NRC) pending resolution of the core region gas outlet temperature fluctuation problem. Even so, the basic performance of the HTGR concept and all of the unique design features have been successfully demonstrated. The system has been characterized by low personnel radiation exposures, operational flexibility, and long time afforded for status evaluation and response. (author)

  14. Strategic Analysis and Plan for Implementing Telemedicine at Fort Greely

    National Research Council Canada - National Science Library

    Bolton, Karl

    2003-01-01

    .... To best accomplish this, a strategic analysis and business case analysis was conducted. Introspective strategic analysis tools revealed an organization that is capable of supporting a telemedicine program at Fort Greely...

  15. BIA Wingate High School WWTF, Fort Wingate, NM: NN0020958

    Science.gov (United States)

    NPDES Permit and Fact Sheet explaining EPA's action under the Clean Water Act to issue NPDES Permit No. NN0020958 to Bureau of Indian Affairs (BIA) Wingate High School Wastewater Treatment Lagoon, Fort Wingate, NM.

  16. RadNet Air Data From Fort Madison, IA

    Science.gov (United States)

    This page presents radiation air monitoring and air filter analysis data for Fort Madison, IA from EPA's RadNet system. RadNet is a nationwide network of monitoring stations that measure radiation in air, drinking water and precipitation.

  17. BRAND EQUITY OF LAHORE FORT AS A TOURISM DESTINATION BRAND

    OpenAIRE

    Muhammad Kashif; Siti Zakiah Melatu Samsi; Syamsulang Sarifuddin

    2015-01-01

    ABSTRACTStudies that measure the brand equity of destination brands by using the Customer-Based Brand Equity (CBBE) model in a developing country context are scarce. The present study investigates the destination brand equity of the Lahore Fort by employing the CBBE model in a developing country context of Pakistan. Following the positivist tradition, we adopted a survey-based approach to collect data from 237 tourists visiting the Lahore Fort. Data were collected through a questionnaire deve...

  18. Undervisning mellem fortælling og feedback

    DEFF Research Database (Denmark)

    Andersen, Kirsten Margrethe

    2016-01-01

    Feedback gør det muligt for den enkelte at forstå, hvordan jeg kan blive bedre til det, jeg er ved at lære. Fortællinger gør det muligt for den enkelte at udvide horisonten og derved komme til en forståelse af, hvilke mulige perspektiver der er for at forholde sig til den verden, som fortællingen...

  19. Land Cover Differences in Soil Carbon and Nitrogen at Fort Benning, Georgia

    Energy Technology Data Exchange (ETDEWEB)

    Garten Jr., C.T.

    2004-02-09

    Land cover characterization might help land managers assess the impacts of management practices and land cover change on attributes linked to the maintenance and/or recovery of soil quality. However, connections between land cover and measures of soil quality are not well established. The objective of this limited investigation was to examine differences in soil carbon and nitrogen among various land cover types at Fort Benning, Georgia. Forty-one sampling sites were classified into five major land cover types: deciduous forest, mixed forest, evergreen forest or plantation, transitional herbaceous vegetation, and barren land. Key measures of soil quality (including mineral soil density, nitrogen availability, soil carbon and nitrogen stocks, as well as properties and chemistry of the O-horizon) were significantly different among the five land covers. In general, barren land had the poorest soil quality. Barren land, created through disturbance by tracked vehicles and/or erosion, had significantly greater soil density and a substantial loss of carbon and nitrogen relative to soils at less disturbed sites. We estimate that recovery of soil carbon under barren land at Fort Benning to current day levels under transitional vegetation or forests would require about 60 years following reestablishment of vegetation. Maps of soil carbon and nitrogen were produced for Fort Benning based on a 1999 land cover map and field measurements of soil carbon and nitrogen stocks under different land cover categories.

  20. Habitat Restoration/Enhancement Fort Hall Reservation : 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Osborne, Hunter [Shoshone Bannock Tribes

    2009-07-23

    Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2008. Enhancement and protection included sloping, fencing and planting wetlands plugs at sites on Spring Creek (Head-waters). Many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). Physical sampling during 2008 included sediment and depth measurements (SADMS) in Spring Creek at the Car Removal site. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for 5 strata on Spring Creek. Water temperature and chemistry were monitored monthly on Spring Creek, Clear Creek, Diggie Creek, and Portneuf (Jimmy Drinks) and Blackfoot rivers. Fish population densities and biomass were sampled in five reservation streams which included nine sites. Sampling protocols were identical to methods used in past years. Numbers of fish in Spring Creek series remained relatively low, however, there was an increase of biomass overall since 1993. Salmonid fry densities were monitored near Broncho Bridge and were similar to 2006, and 2007, however, as in years past, high densities of macrophytes make it very difficult to see fry in addition to lack of field technicians. Mean catch rate by anglers on Bottoms streams stayed the same as 2007 at 1.5/hr. Numbers of fish larger than 18-inches caught by anglers increased from 2007 at .20 to .26/hr.

  1. Archive of post-Hurricane Isabel coastal oblique aerial photographs collected during U.S. Geological Survey Field Activity 03CCH01 from Ocean City, Maryland, to Fort Caswell, North Carolina and Inland from Waynesboro to Redwood, Virginia, September 21 - 23, 2003

    Science.gov (United States)

    Subino, Janice A.; Morgan, Karen L.M.; Krohn, M. Dennis; Dadisman, Shawn V.

    2013-01-01

    On September 21 - 23, 2003, the United States Geological Survey (USGS) conducted an oblique aerial photographic survey along the Atlantic coast from Ocean City, Md., to Fort Caswell, N.C., and inland oblique aerial photographic survey from Waynesboro to Redwood, Va., aboard a Navajo Piper twin-engine airplane. The coastal survey was conducted at an altitude of 500 feet (ft) and approximately 1,000 ft offshore. For the inland photos, the aircraft tried to stay approximately 500 ft above the terrain. These coastal photos were used to document coastal changes like beach erosion and overwash caused by Hurricane Isabel, while the inland photos looked for potential landslides caused by heavy rains. The photos may also be used as baseline data for future coastal change analysis. The USGS and the National Aeronautics and Space Administration (NASA) surveyed the impact zone of Hurricane Isabel to better understand the changes in vulnerability of the Nation’s coasts to extreme storms (Morgan, 2009). This report serves as an archive of photographs collected during the September 21 - 23, 2003, post-Hurricane Isabel coastal and inland oblique aerial survey along with associated survey maps, KML files, navigation files, digital Field Activity Collection System (FACS) logs, and Federal Geographic Data Committee (FGDC) metadata. Refer to the Acronyms page for expansions of all acronyms and abbreviations used in this report. The USGS St. Petersburg Coastal and Marine Science Center (SPCMSC) assigns a unique identifier to each cruise or field activity. For example, 03CCH01 tells us the data were collected in 2003 for the Coastal Change Hazards (CCH) study and the data were collected during the first field activity for that project in that calendar year. Refer to http://walrus.wr.usgs.gov/infobank/programs/html/definition/activity.html for a detailed description of the method used to assign the ID number. The photographs provided here are Joint Photographic Experts Group (JPEG

  2. Fort Collins Science Center fiscal year 2010 science accomplishments

    Science.gov (United States)

    Wilson, Juliette T.

    2011-01-01

    The scientists and technical professionals at the U.S. Geological Survey (USGS), Fort Collins Science Center (FORT), apply their diverse ecological, socioeconomic, and technological expertise to investigate complicated ecological problems confronting managers of the Nation's biological resources. FORT works closely with U.S. Department of the Interior (DOI) agency scientists, the academic community, other USGS science centers, and many other partners to provide critical information needed to help answer complex natural-resource management questions. In Fiscal Year 2010 (FY10), FORT's scientific and technical professionals conducted ongoing, expanded, and new research vital to the science needs and management goals of DOI, other Federal and State agencies, and nongovernmental organizations in the areas of aquatic systems and fisheries, climate change, data and information integration and management, invasive species, science support, security and technology, status and trends of biological resources (including the socioeconomic aspects), terrestrial and freshwater ecosystems, and wildlife resources, including threatened and endangered species. This report presents selected FORT science accomplishments for FY10 by the specific USGS mission area or science program with which each task is most closely associated, though there is considerable overlap. The report also includes all FORT publications and other products published in FY10, as well as staff accomplishments, appointments, committee assignments, and invited presentations.

  3. Fort Collins Science Center - Fiscal Year 2008 Science Accomplishments

    Science.gov (United States)

    Wilson, Juliette T.

    2009-01-01

    Public land and natural resource managers in the United States are confronted with increasingly complex decisions that have important ramifications for both ecological and human systems. The scientists and technical professionals at the U.S. Geological Survey (USGS) Fort Collins Science Center (FORT) contribute a unique blend of ecological, socioeconomic, and technological expertise to investigating complicated ecological problems that address critical management questions. In Fiscal Year 2008 (FY08), FORT's scientific and technical professionals continued research vital to the science and management needs of U.S. Department of the Interior agencies and other entities. This annual report describes select FY08 accomplishments in research and technical assistance involving biological information management and delivery; aquatic, riparian, and managed-river ecosystems; invasive species; status and trends of biological resources (including human dimensions and social science); terrestrial ecosystems; and fish and wildlife resources.

  4. Targeting Net Zero Energy at Fort Carson: Assessment and Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, K.; Markel, T.; Simpson, M.; Leahey, J.; Rockenbaugh, C.; Lisell, L.; Burman, K.; Singer, M.

    2011-10-01

    The U.S. Army's Fort Carson installation was selected to serve as a prototype for net zero energy assessment and planning. NREL performed the comprehensive assessment to appraise the potential of Fort Carson to achieve net zero energy status through energy efficiency, renewable energy, and electric vehicle integration. This report summarizes the results of the assessment and provides energy recommendations. This study is part of a larger cross-laboratory effort that also includes an assessment of renewable opportunities at seven other DoD Front Range installations, a microgrid design for Fort Carson critical loads and an assessment of regulatory and market-based barriers to a regional secure smart grid.

  5. Assessment of conservation practices in the Fort Cobb Reservoir watershed, southwestern Oklahoma

    Science.gov (United States)

    Becker, Carol J.

    2011-01-01

    The Fort Cobb Reservoir watershed encompasses about 813 square kilometers of rural farm land in Caddo, Custer, and Washita Counties in southwestern Oklahoma. The Fort Cobb Reservoir and six stream segments were identified on the Oklahoma 1998 303(d) list as not supporting designated beneficial uses because of impairment by nutrients, suspended solids, sedimentation, pesticides, and unknown toxicity. As a result, State and Federal agencies, in collaboration with conservation districts and landowners, started conservation efforts in 2001 to decrease erosion and transport of sediments and nutrients to the reservoir and improve water quality in tributaries. The U.S. Department of Agriculture selected the Fort Cobb Reservoir watershed in 2003 as 1 of 14 benchmark watersheds under the Conservation Effectiveness Assessment Project with the objective of quantifying the environmental benefits derived from agricultural conservation programs in reducing inflows of sediments and phosphorus to the reservoir. In November 2004, the Biologic, Geographic, Geologic, and Water Disciplines of the U.S. Geological Survey, in collaboration with the Agricultural Research Service, Grazinglands Research Laboratory in El Reno, Oklahoma, began an interdisciplinary investigation to produce an integrated publication to complement this program. This publication is a compilation of 10 report chapters describing land uses, soils, geology, climate, and water quality in streams and the reservoir through results of field and remote sensing investigations from 2004 to 2007. The investigations indicated that targeting best-management practices to small intermittent streams draining to the reservoir and to the Cobb Creek subwatershed may effectively augment efforts to improve eutrophic to hypereutrophic conditions that continue to affect the reservoir. The three major streams flowing into the reservoir contribute nutrients causing eutrophication, but minor streams draining cultivated fields near the

  6. Renewable Energy Opportunities at Fort Campbell, Tennessee/Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    Hand, James R.; Horner, Jacob A.; Kora, Angela R.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Nesse, Ronald J.

    2011-03-31

    This document provides an overview of renewable resource potential at Fort Campbell, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Campbell took place on June 10, 2010.

  7. Fortælling og fortolkning i Jyske Bank

    DEFF Research Database (Denmark)

    Albrechtsen, Charlotte

    Afhandlingen præsenterer en undersøgelse af et konkret eksempel på storytelling brugt som strategisk ledelses- og kommunikationsredskab i en organisations interne kommunikation. Eksemplet er fortællingen "Slaget ved Vejle", som stammer fra Jyske Bank og udgør under afhandlingens case. De overordn......Afhandlingen præsenterer en undersøgelse af et konkret eksempel på storytelling brugt som strategisk ledelses- og kommunikationsredskab i en organisations interne kommunikation. Eksemplet er fortællingen "Slaget ved Vejle", som stammer fra Jyske Bank og udgør under afhandlingens case. De...

  8. Renewable Energy Opportunities at Fort Drum, New York

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Scott A.; Orrell, Alice C.; Solana, Amy E.; Williamson, Jennifer L.; Hand, James R.; Russo, Bryan J.; Weimar, Mark R.; Rowley, Steven; Nesse, Ronald J.

    2010-10-20

    This document provides an overview of renewable resource potential at Fort Drum, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Drum took place on May 4 and 5, 2010.

  9. En fascinerende fortælling om det 20. århundredes musik

    DEFF Research Database (Denmark)

    Bonde, Lars Ole

    2011-01-01

    Anmeldelse af Karl Aage Rasmussen: Musik i det tyvende århundrede: En fortælling. Gyldendal 2011.......Anmeldelse af Karl Aage Rasmussen: Musik i det tyvende århundrede: En fortælling. Gyldendal 2011....

  10. 78 FR 39599 - Safety Zone; Fort Monroe Fireworks Display, Chesapeake Bay, Hampton, VA

    Science.gov (United States)

    2013-07-02

    ...-AA00 Safety Zone; Fort Monroe Fireworks Display, Chesapeake Bay, Hampton, VA AGENCY: Coast Guard, DHS... navigable waters of the Chesapeake Bay in Hampton, VA to support the Fort Monroe Fireworks. This action is... Authority will host a fireworks display in the Chesapeake Bay off of Fort Monroe in Hampton, VA. The...

  11. 77 FR 35308 - Proposed Amendment of Restricted Area R-6601; Fort A.P. Hill, VA

    Science.gov (United States)

    2012-06-13

    ...-0561; Airspace Docket No. 12-AEA-7] Proposed Amendment of Restricted Area R-6601; Fort A.P. Hill, VA..., Fort A.P. Hill, VA. The U. S. Army requested this action to provide the additional airspace needed to... Garrison, Fort A.P. Hill, VA 22427; telephone: (804) 633-8223. FOR FURTHER INFORMATION CONTACT: Paul...

  12. Case Study: Fort Mill High School--A Culture of Continuous Improvement

    Science.gov (United States)

    Southern Regional Education Board (SREB), 2014

    2014-01-01

    This is the latest in a series of case studies highlighting best practices High Schools That Work (HSTW) network schools and districts are implementing to prepare students better for further studies and careers. Fort Mill High School is in Fort Mill, South Carolina, an outlying suburb of Charlotte, North Carolina. Fort Mill links high quality…

  13. 33 CFR 208.27 - Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Fort Cobb Dam and Reservoir, Pond..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.27 Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma. The Bureau of Reclamation shall operate the Fort Cobb Dam and Reservoir in...

  14. 78 FR 3479 - Notice of Public Meeting of Fort Scott Council

    Science.gov (United States)

    2013-01-16

    ... PRESIDIO TRUST Notice of Public Meeting of Fort Scott Council AGENCY: The Presidio Trust. ACTION: Notice of public meeting of Fort Scott Council. SUMMARY: Pursuant to the Federal Advisory Committee Act, as amended (5 U.S.C. Appendix 2), notice is hereby given that a public meeting of the Fort Scott...

  15. 78 FR 18633 - Notice of Public Meeting of Fort Scott Council

    Science.gov (United States)

    2013-03-27

    ... PRESIDIO TRUST Notice of Public Meeting of Fort Scott Council AGENCY: The Presidio Trust. ACTION: Notice of public meeting of Fort Scott Council. SUMMARY: Pursuant to the Federal Advisory Committee Act, as amended (5 U.S.C. Appendix 2), notice is hereby given that a public meeting of the Fort Scott...

  16. 76 FR 71611 - Notice of Establishment of the Fort Winfield Scott Advisory Committee

    Science.gov (United States)

    2011-11-18

    ... PRESIDIO TRUST Notice of Establishment of the Fort Winfield Scott Advisory Committee AGENCY: The Presidio Trust. ACTION: Notice of establishment of the Fort Winfield Scott Advisory Committee. SUMMARY... the Presidio Trust announces the intent to establish the Fort Winfield Scott Advisory Committee...

  17. Workplan for U.S. Geological Survey hydrologic data-collection and support activities on Fort Wainwright, Alaska, 1994-97

    Science.gov (United States)

    Claar, David V.; Lilly, Michael R.

    1999-01-01

    The U.S. Army Alaska is responsible for environmental activities on Fort Wainwright near Fairbanks, Alaska. In order to better meet the needs of environmental investigations, the Army requires geohydrologic information about the Fort Wainwright area. Since 1994, the U.S. Geological Survey has been working in cooperation with the U.S. Army Alaska and the U.S. Army Corps of Engineers to investigate the geohydrology of the Fort Wainwright area. The primary objectives of the study are to collect basic ground-water and surface-water data and to support ongoing environmental investigations by other agencies. This report is the workplan describing the technical methods used by the USGS to meet these objectives. It includes details on field procedures, data collection, and analyses of water samples.

  18. 32 CFR 552.168 - Fort Lewis Area Access Office.

    Science.gov (United States)

    2010-07-01

    ... of this subpart. (d) A wallet-sized permit (HFL Form 653) and a vehicle pass (HFL Form 652) will be... 552.168 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY..., Yakima Training Center, and Camp Bonneville § 552.168 Fort Lewis Area Access Office. (a) DPTM Range...

  19. Report on Adolescent Pregnancy in Fort Worth, Texas.

    Science.gov (United States)

    Tees, Sandra

    Teenage pregnancy is an overwhelming problem in Fort Worth, Texas. To examine the problem of teenage pregnancy, figures on total live births by age, race, repeat pregnancy, and at-risk infants were gathered from 1981 and 1982 Department of Public Health data. In addition, consequences of teenage pregnancy and motivation factors were examined. An…

  20. Informal report on measurements of slant TEC by FORTE

    International Nuclear Information System (INIS)

    Massey, R.S.

    1997-01-01

    Los Alamos National Laboratory's Space and Atmospheric Sciences group is now operating the FORTE satellite, which has two sets of instruments: optical detectors and radio detectors. In this report the author describes work with one set of radio detectors that allow measurements of the total electron content (TEC) traversed by VHF radiation originating at an electromagnetic pulse (EMP) generator located at Los Alamos

  1. 25 CFR 162.501 - Fort Belknap Reservation.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Fort Belknap Reservation. 162.501 Section 162.501 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER LEASES AND PERMITS Special... may be leased for the culture of sugar beets and other crops in rotation for terms not exceeding ten...

  2. Fort Peck-Wolf Point transmission line project, Montana

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the project is to replace the existing 36-mile Fort Peck-Wolf Point transmission line which has reached the end of its useful service life. Presently, the overall condition of this existing section of the 47-year-old line is poor. Frequent repairs have been required because of the absence of overhead ground wires. The continued maintenance of the line will become more expensive and customer interruptions will persist because of the damage due to lightning. The expense of replacing shell rotted poles, and the concern for the safety of the maintenance personnel because of hazards caused by severe shell rot are also of primary importance. The operational and maintenance problems coupled with power system simulation studies, demonstrate the need for improvements to the Wolf Point area to serve area loads. Western's Wolf Point Substation is an important point of interconnection for the power output from the Fort Peck Dam to area loads as far away as Williston, North Dakota. The proposed transmission line replacement would assure that there will continue to be reliable transmission capacity available to serve area electrical loads, as well as provide a reliable second high-voltage transmission path from the Fort Peck generation to back-up a loss of the Fort Peck-Wolf Point 115-kV Line No. 1

  3. Tile forts of the Liesbeeck Frontier | Sleigh | Scientia Militaria: South ...

    African Journals Online (AJOL)

    Scientia Militaria: South African Journal of Military Studies. Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 27 (1997) >. Log in or Register to get access to full text downloads. Username, Password, Remember me, or Register. Tile forts of the Liesbeeck Frontier.

  4. Frakturerede fortænder – behandling med direkte plast

    DEFF Research Database (Denmark)

    Pallesen, Ulla; van Dijken, Jan WV

    2018-01-01

    Kompositte plastmaterialer og adhæsivteknik har gjort det muligt at restaurere frakturerede fortænder med minimal risiko for pulpale og parodontale komplikationer hos både børn og voksne. Behandlingen kan udføres umiddelbart efter traumet, hvis skaden ikke involverer parodontium eller knogle. Kla...

  5. Calculation of Void in the Fort Saint Vrain Material

    Energy Technology Data Exchange (ETDEWEB)

    Potter, David Charles [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Taylor, Craig Michael [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Coons, James Elmer [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-11

    The percent void of the Fort Saint Vrain (FSV) material is estimated to be 21.1% based on the volume of the gap at the top of the drums, the volume of the coolant channels in the FSV fuel element, and the volume of the fuel handling channel in the FSV fuel element.

  6. Clinical Evaluation of the Efficacy of Arthocare Forte, A Chondro ...

    African Journals Online (AJOL)

    Background: Arthocare forte medication is made up of different constituents and the advantages offered by this disposition have not been explored in the management of chronic periodontitis. Aim: The aim was to assess the clinical response of bacterial plaque.induced generalized chronic periodontitis to arthocare ...

  7. Analysis of Atmospheric Mercury and Associated Trace Gases in Dallas Fort Worth, TX (Barnett Shale area)

    Science.gov (United States)

    Laine, P. L.; Talbot, R. W.; Lefer, B. L.; Flynn, J. H.

    2012-12-01

    Throughout the month of June 2011, a variety of air quality measurements were obtained in the Dallas Fort Worth (Barnett Shale) field campaign. Species such as Hg0, O3, CO, NO, NO2, SO2 were monitored continuously along with a variety of volatile organic carbon (VOC) species ranging in size from C2 (ethane) to C9 aromatics to sesquiterpines. Mixed layer boundary heights were also monitored by Ceilometer measurements. At first glance, the mercury data has peaks that reach as high as 750 ppqv (parts per quadrillion by volume) which is approximately a 5 fold increase over the typical background values observed (~ 150 ppqv). The Fort Worth area has underlying Barnett Shale with thousands of natural gas compressor stations scattered throughout the surrounding landscape. We believe that a potential source of the elevated Hg0 is the result of leakage from these stations under the nocturnal boundary layer. A closer look at diurnal variations and backward wind trajectories will yield information pertaining to the types of air masses spanning the area. We will utilize the suite of chemical and meteorological measurements conducted during the campaign to facilitate source identification for specific time periods. Analysis of these data should provide new information on as yet unexplored sources of atmospheric mercury.

  8. Engineering and geologic investigation of potential sources of aggregate, Fort Irwin, California

    Science.gov (United States)

    Webster, S. L.; Smith, L. M.

    1982-08-01

    Planned construction at Fort Irwin for the National Training Center consists of a number of buildings, roads, parking areas, and other structures in the cantonment area, an airfield with structures and aprons, and a railroad spur. The total amount of bituminous and concrete aggregates required for the construction ranges between 200,000 and 300,000 tons. This investigation was conducted to determine if adequate quantities of good quality fine aggregate and coarse aggregate could be excavated at a reasonable cost from two designated locations. This report describes the geology of the aggregate sources and presents the results of the field explorations and laboratory testing program. The sites investigated were found to contain adequate quantities of good quality fine and coarse aggregates suitable for use in the planned construction activities at Fort Irwin. Select borrow material from both sites is suitable for use as subgrade and subbase course. Crushed material from the coarse aggregate site is suitable for use as a stabilized aggregate base with a design CBR 80. The crushed coarse aggregate material is suitable for use in bituminous concrete; however, stripping is a problem and an antistripping agent will be required. Good quality portland cement concrete can be produced using aggregates from the two sites. However, since the aggregates are potentially reactive in the alkali-silica reaction, it is recommended that low-alkali portland cement be required in the concrete.

  9. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  10. 2014 Fort Hood, Texas, mass casualty incident: reviews and perspectives

    OpenAIRE

    Strommen, Joshua J.; Waterman, Scott M.; Mitchell, Christopher A.; Grogan, Brian F.

    2015-01-01

    On April 2, 2014, in Fort Hood, Texas, an active shooter incident occurred where four active duty soldiers were tragically killed. Active shooter incidents are becoming alarmingly more frequent over the last decade in the USA. The authors provide a detailed account of the events that occurred within the hospital and an evaluation of the triage decisions made on that day. A detailed review of mass casualty preparedness and the general approach to triage processes are also described.

  11. Comprehensive Base Realignment/Closure and Fort Belvoir Development

    Science.gov (United States)

    1991-06-01

    areas are palus- i trine forested wetlands. Fort Belvoir’s wetlands encompass a wide range of water regimes and salinities . The I wetlands at the...become freshwater tidal wetlands and finally nontidal wetlands. The variety of salinities and tidal regimes support a diverse array of vegetation... Gammarus amphipods Leptocheirus tubicolus amphipods Cyanthura amphipod crustaceansI Corbicula bivalve molluscs Anodonta bivalve molluscsI Musculium

  12. Assessment of DOD Wounded Warrior Matters -- Fort Drum

    Science.gov (United States)

    2011-09-30

    identified a number of significant challenges that we recommend the Commanding General, 10th Mountain Division; Warrior Transition Command ( WTC ), MEDDAC...to the Warriors themselves. We suggest that the WTC , MEDDAC, and WTB leadership and staff consider Warrior comments, as discussed in this report...General, 10th Mountain Division, WTC , MEDDAC and WTB leadership: • Develop an operational definition of a successful transition end state for Fort

  13. Fort Peck Dam: 75 Years of Service, 1937-2012

    Science.gov (United States)

    2012-01-01

    River Bridge begins. March 20 - Milk River bridge open to traffic. April 5 - Town buildings and services started under a group of contracts. April 12...amount of supplies and materials needed to build Fort Peck, a 12-mile railroad spur was built including this bridge across the Milk River. More than...in need. Girl Scouts, Boy Scouts and 4-H clubs as well as sports, school dances, carnivals and traveling circuses kept kids and families entertained

  14. Simulation of Vegetation Recovery from Military Disturbances on Fort Bliss

    Science.gov (United States)

    2005-11-01

    Herbivory 4. Granivory 5. Digging 6. Extreme events 7. Erosion 8. Dust 9. Restoration IV.1. Generic disturbance IV.1.1. General... Herbivory Clipping Insects Rodents kangaroo rats Lagomorphs Simulation of Vegetation Recovery from Military Disturbances on Fort Bliss 51 IV.4...Naturalist, 131: 459–490. 59. McAuliffe, J.R. (1994) Landscape evolution , soil formation, and ecological patterns and processes in Sonoran desert bajadas

  15. Black Swan Event Assessment for Fort Leonard Wood, Missouri

    Science.gov (United States)

    2016-03-01

    visioned in conventional risk- management activities. This sort of analysis is important for purposes of planning for disruptive events that seem only a...this event is one that should be already in Fort Leonard Wood’s Risk Management Plan. However, the plan should be checked to see if it con- siders... management should be developed in consultation with forest managers across the region. ERDC/CERL SR-16-1 28 7 Earthquake 7.1 Potential events

  16. Leaktightness in HTGRs - experience at Fort St. Vrain

    International Nuclear Information System (INIS)

    Neylan, A.J.; Barker, R.A.; Deardorff, A.F.

    1976-01-01

    The Fort St. Vrain Prestressed Concrete Reactor Vessel is the first utilized to contain the helium coolant of a High Temperature Gas-Cooled Reactor. Because the helium coolant contains fission products, leakage from the vessel is limited to 15 percent of vessel inventory per year. This paper describes the fabrication methods and development tests used to assure this leaktightness and the leakage test conducted to verify it. (author)

  17. National Training Center Fort Irwin expansion area aquatic resources survey

    Energy Technology Data Exchange (ETDEWEB)

    Cushing, C.E.; Mueller, R.P.

    1996-02-01

    Biologists from Pacific Northwest National Laboratory (PNNL) were requested by personnel from Fort Irwin to conduct a biological reconnaissance of the Avawatz Mountains northeast of Fort Irwin, an area for proposed expansion of the Fort. Surveys of vegetation, small mammals, birds, reptiles, amphibians, and aquatic resources were conducted during 1995 to characterize the populations and habitats present with emphasis on determining the presence of any species of special concern. This report presents a description of the sites sampled, a list of the organisms found and identified, and a discussion of relative abundance. Taxonomic identifications were done to the lowest level possible commensurate with determining the status of the taxa relative to its possible listing as a threatened, endangered, or candidate species. Consultation with taxonomic experts was undertaken for the Coleoptera ahd Hemiptera. In addition to listing the macroinvertebrates found, the authors also present a discussion related to the possible presence of any threatened or endangered species or species of concern found in Sheep Creek Springs, Tin Cabin Springs, and the Amargosa River.

  18. The FORTE receiver and sub-band triggering unit

    Energy Technology Data Exchange (ETDEWEB)

    Enemark, D.C.; Shipley, M.E.

    1994-08-01

    The FORTE payload receiver and trigger unit represent a significant advance over the currently flying BLACKBEARD payload aboard the ALEXIS satellite. Not only is the polarization sensitive antenna array massive compared to the BLACKBEARD monopole, but the event triggering scheme is completely different. Electromagnetic pulses (EWs) are dispersed when they pass through the ionosphere creating a chirped frequency signal which can be helpful in discriminating between natural and man-made signals. Payloads designed to digitize and store the RF signatures of these signals must include sophisticated triggering circuitry to select events of interest and prevent false alarms from wasting the available memory storage resources. The FORTE wideband receiver tunes from 20 to 320 MHz with eight sub-band trigger channels distributed across the 20 MHz IF bandwidth. The conditions which must be satisfied to generate an event trigger are processor controlled. Early testing of the prototype indicates an ability to reliably trigger on chirped RF signals several dB below the noise level. FORTE is scheduled to be launched with a Pegasus XL vehicle in late 1995.

  19. BRAND EQUITY OF LAHORE FORT AS A TOURISM DESTINATION BRAND

    Directory of Open Access Journals (Sweden)

    Muhammad Kashif

    2015-06-01

    Full Text Available Studies that measure the brand equity of destination brands by using the Customer-Based Brand Equity (CBBE model in a developing country context are scarce. The present study investigates the destination brand equity of the Lahore Fort by employing the CBBE model in a developing country context of Pakistan. Following the positivist tradition, we adopted a survey-based approach to collect data from 237 tourists visiting the Lahore Fort. Data were collected through a questionnaire developed to explain the relationship of brand awareness, brand image, brand association, and brand loyalty with Lahore Fort’s overall brand equity. We used various robust statistical techniques such as correlation, regression and confirmatory factor analysis (using PLS method to reach meaningful conclusions and found that brand image and brand associations positively contribute to brand loyalty. Furthermore, brand loyalty significantly contributes towards overall brand equity. Pragmatically, this study measures the customer based brand equity of the Lahore Fort, a destination brand. The results are useful as they suggest a few strategies that can help policy makers to enhance Lahore Fort’s brand performance.

  20. Survey on the radon gas content and surface gamma radiometry in the cape Fort William area

    International Nuclear Information System (INIS)

    Fajardo, Marco

    1998-01-01

    The Ecuadorian Commission of Atomic Energy, during the last years have carried out investigations on the presence of Radon in the Ecuador with a numberless of purposes: radon in polluted spaces, contamination of radon in mining work, radon applied to detection of uranium and exploration of uranium, getting outputs that in their due moment have been published in several reports through the CEEA. Within the Antarctic Ecuadorian Program, it was expounded carry out investigation, on the presence of the gas radon and superficial gamma radiometry in pint Fort William. This study enlarges to the Bransfield Strait, utilizing portable equipment, and allowed to carry out studies in inhospitable zones, where an infrastructure does not exist in order to could employ more complex equipment. The bank of data gotten on radiometry and emanometry will apply to fields of radioprotection, geophysics and geology

  1. Astronaut Neil Armstrong studies rock samples during geological field trip

    Science.gov (United States)

    1969-01-01

    Astronaut Neil Armstrong, commander of the Apollo 11 lunar landing mission, studies rock samples during a geological field trip to the Quitman Mountains area near the Fort Quitman ruins in far west Texas.

  2. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    Science.gov (United States)

    1995-08-01

    1-22 0N 2/, , J;~ 7 EXPLANATION Location of Pasto Activity Location Hazardous Substance --- Installation Boundary Atvte North andI Main Posts...interspersion of pasture, woodlots, orchards , and some cropped fields. Much of the installation is composed of old fields and woodlots. These areas are now in

  3. 78 FR 21817 - Amendment of Restricted Area R-6601; Fort A.P. Hill, VA

    Science.gov (United States)

    2013-04-12

    ...; Airspace Docket No. 12-AEA-7] RIN 2120-AA66 Amendment of Restricted Area R-6601; Fort A.P. Hill, VA AGENCY... limits and time of designation of restricted area R-6601, Fort A.P. Hill, VA. The U.S. Army requested... limits and increase the time of designation of restricted area R-6601, Fort A.P. Hill, VA, (77 FR 35308...

  4. The Use of Bifocal Soft Contact Lenses in the Fort Rucker Aviation Environment

    National Research Council Canada - National Science Library

    Morse, Stephen

    1997-01-01

    ... meet the visual requirements needed to fly military aircraft. Seventeen volunteer presbyopic aviators from Fort Rucker were fitted with five bifocal soft contact lens combinations and bifocal glasses...

  5. ALARA and decommissioning: The Fort St. Vrain experience

    Energy Technology Data Exchange (ETDEWEB)

    Borst, T.; Niehoff, M. [Public Service Co. of Colorado, Platteville, CO (United States); Zachary, M. [Scientific Ecology Group, Platteville, CO (United States)

    1995-03-01

    The Fort St. Vrain Nuclear Generating Station, the first and only commercial High Temperature Gas Cooled Reactor to operate in the United States, completed initial fuel loading in late 1973 and initial startup in early 1974. Due to a series of non-nuclear technical problems, Fort St. Vrain never operated consistently, attaining a lifetime capacity factor of slightly less than 15%. In August of 1989, the decision was made to permanently shut down the plant due to control rod drive and steam generator ring header failures. Public Service Company of Colorado elected to proceed with early dismantlement (DECON) as opposed to SAFSTOR on the bases of perceived societal benefits, rad waste, and exposure considerations, regulatory uncertainties associated with SAFSTOR, and cost. The decommissioning of Fort St. Vrain began in August of 1992, and is scheduled to be completed in early 1996. Decommissioning is being conducted by a team consisting of Westinghouse, MK-Ferguson, and Scientific Ecology Group. Public Service Company of Colorado as the licensee provides contract management and oversight of contractor functions. An aggressive program to maintain project radiation exposures As Low As Reasonably Achievable (ALARA) has been established, with the following program elements: temporary and permanent shielding contamination control; mockup training; engineering controls; worker awareness; integrated work package reviews communication; special instrumentation; video camera usage; robotics application; and project committees. To date, worker exposures have been less than project estimates. from the start of the project through Februrary of 1994, total exposure has been 98.666 person-rem, compared to the project estimate of 433 person-rem and goal of 347 person-rem. The presentation will discuss the site characterization efforts, the radiological performance indicator program, and the final site release survey plans.

  6. Højer fortæller marsklivets historie

    DEFF Research Database (Denmark)

    2017-01-01

    sin familie og også har værtsted og galleri. Hun faldt for huset charme og den historie, der gemmer sig i det grå, grønne og røde almuefarvede træværk, de udskårne døre og entreens rå gamle rødflammede mursten Hver landsdel og kommune har sine helt særlige fortællinger, som man kan opleve i de...

  7. Dynamic computer simulation of the Fort St. Vrain steam turbines

    International Nuclear Information System (INIS)

    Conklin, J.C.

    1983-01-01

    A computer simulation is described for the dynamic response of the Fort St. Vrain nuclear reactor regenerative intermediate- and low-pressure steam turbines. The fundamental computer-modeling assumptions for the turbines and feedwater heaters are developed. A turbine heat balance specifying steam and feedwater conditions at a given generator load and the volumes of the feedwater heaters are all that are necessary as descriptive input parameters. Actual plant data for a generator load reduction from 100 to 50% power (which occurred as part of a plant transient on November 9, 1981) are compared with computer-generated predictions, with reasonably good agreement

  8. Fort Carson Building 1860 Biomass Heating Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Hunsberger, Randolph [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tomberlin, Gregg [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gaul, Chris [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    As part of the Army Net-Zero Energy Installation program, the Fort Carson Army Base requested that NREL evaluate the feasibility of adding a biomass boiler to the district heating system served by Building 1860. We have also developed an Excel-spreadsheet-based decision support tool--specific to the historic loads served by Building 1860--with which users can perform what-if analysis on gas costs, biomass costs, and other parameters. For economic reasons, we do not recommend adding a biomass system at this time.

  9. Vegetation inventory, mapping, and classification report, Fort Bowie National Historic Site

    Science.gov (United States)

    Studd, Sarah; Fallon, Elizabeth; Crumbacher, Laura; Drake, Sam; Villarreal, Miguel

    2013-01-01

    A vegetation mapping and characterization effort was conducted at Fort Bowie National Historic Site in 2008-10 by the Sonoran Desert Network office in collaboration with researchers from the Office of Arid lands studies, Remote Sensing Center at the University of Arizona. This vegetation mapping effort was completed under the National Park Service Vegetation Inventory program which aims to complete baseline mapping inventories at over 270 national park units. The vegetation map data was collected to provide park managers with a digital map product that met national standards of spatial and thematic accuracy, while also placing the vegetation into a regional and even national context. Work comprised of three major field phases 1) concurrent field-based classification data collection and mapping (map unit delineation), 2) development of vegetation community types at the National Vegetation Classification alliance or association level and 3) map accuracy assessment. Phase 1 was completed in late 2008 and early 2009. Community type descriptions were drafted to meet the then-current hierarchy (version 1) of the National Vegetation Classification System (NVCS) and these were applied to each of the mapped areas. This classification was developed from both plot level data and censused polygon data (map units) as this project was conducted as a concurrent mapping and classification effort. The third stage of accuracy assessment completed in the fall of 2010 consisted of a complete census of each map unit and was conducted almost entirely by park staff. Following accuracy assessment the map was amended where needed and final products were developed including this report, a digital map and full vegetation descriptions. Fort Bowie National Historic Site covers only 1000 acres yet has a relatively complex landscape, topography and geology. A total of 16 distinct communities were described and mapped at Fort Bowie NHS. These ranged from lush riparian woodlands lining the

  10. The evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, P.J.; Shonder, J.A.

    1998-03-01

    This report documents an independent evaluation of an energy retrofit of 4,003 family housing units at Fort Polk, Louisiana, under an energy savings performance contract (ESPC). Replacement of the heating, cooling, and water heating systems in these housing units with geothermal heat pumps (GHPs) anchored the retrofit; low-flow shower heads and compact fluorescent lighting were also installed, as well as attic insulation where needed. Statistically valid findings indicate that the project will save 25.8 million kWh, or 32.5% of the pre-retrofit whole-community electrical consumption, and 100% of the whole-community natural gas previously used for space conditioning and water heating (260,000 therms) in a typical meteorological year. At the end-use level, the GHPs were found to save about 42% of the pre-retrofit electrical consumption for heating, cooling, and water heating in housing units that were all-electric in the pre-retrofit period. This report also demonstrates an improved method of predicting energy savings. Using an engineering model calibrated to pre-retrofit energy use data collected in the field, the method predicted actual energy savings on one of the electric feeders at Fort Polk with a very high degree of accuracy. The accuracy of this model was in turn dependent on data-calibrated models of the geothermal heat pump and ground heat exchanger that are described in this report. In addition this report documents the status of vertical borehole ground heat exchanger (BHEx) design methods at the time this project was designed, and demonstrates methods of using data collected from operating GHP systems to benchmark BHEx design methods against a detailed engineering model calibrated to date. The authors also discuss the ESPC`s structure and implementation and how the experience gained here can contribute to the success of future ESPCs.

  11. Solar Energy Development Assistance for Fort Hunter Liggett

    Energy Technology Data Exchange (ETDEWEB)

    Russo, Bryan J.; Hoffman, Michael G.; Chvala, William D.

    2011-03-30

    Pacific Northwest National Laboratory provided assistance to Fort Hunter Liggett to determine the opportunities for solar energy development on the site. Increasing use of renewable energy is mandated by several executive orders and legislation. Fort Hunter Liggett has many attributes that enhance its suitability for renewable energy development. First, the site is located south of San Francisco in a remote portion of the costal foothills. Brush and forest fires are frequent and often result in power outages, which subsequently impacts the site’s training mission. In addition, the site’s blended electric rate during fiscal year (FY) 2010 was high at 12 ¢/kWh. Lastly, the solar resource is moderately high; the site receives nearly 5.7 kWh/m2/day on a south facing, latitude-tilted surface. In light of these factors, the site is a clear candidate for a solar photovoltaic array. Prior to Pacific Northwest National Laboratory’s (PNNL) involvement, the site secured funding for a 1 megawatt (MW) photovoltaic (PV) array that will also provide shading for site vehicles. To best implement this project, PNNL conducted a site visit and was tasked with providing the site technical guidance and support regarding module selection, array siting, and other ancillary issues.

  12. Fort Stewart integrated resource assessment. Volume 3: Resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, G.P.; Keller, J.M.; Stucky, D.J.; Wahlstrom, R.R.; Larson, L.L.

    1993-10-01

    The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Stewart facility located approximately 25 miles southwest of Savannah, Georgia. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 11 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO. The tables also present the results of the life-cycle cost (LCC) analysis indicating the net present value (NPV) and savings to investment ratio (SIR) of each ERO.

  13. Fort Drum integrated resource assessment. Volume 3, Resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, D.R.; Armstrong, P.R.; Daellenbach, K.K.; Dagle, J.E.; Di Massa, F.V.; Elliott, D.B.; Keller, J.M.; Richman, E.E.; Shankle, S.A.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric and fossil fuel cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 2, the Baseline Detail.

  14. Neurosensory changes of palatal mucousa following Le Fort I osteotomy

    Directory of Open Access Journals (Sweden)

    Bijan Movahedian Attar

    2009-09-01

    Full Text Available

    • BACKGROUND: This study evaluated the sensation of palatal ucosa before and after Le Fort I osteotomy and compared it based on whether greater palatine nerve has been dissected or not.
    • METHODS: Sixteen patients were studied within one week before  urgery and then one week, 6 weeks, 3 months and 6 months after surgery. Four tests including sharp-blunt discrimination, cold perception, pin prick sensation and electrical stimulation were performed.
    • RESULTS: Mean values of electrical stimulation were significantly higher 6 months after surgery (p < 0.05, on the other hand mean values of pin-prick sensation were significantly lower (p < 0.05. All patients regardless of the condition of greater palatine nerve were responsive to cold perception and sharp-blunt discrimination 6 months after surgery.
    • CONCLUSIONS: Following Le Fort I osteotomy, palatal  esponsiveness to electrical stimulation decreases and mechanical hyper sensitization occurs. Dissection of greater palatine nerve was shown to have no effect on the results.
    • KEYWORDS: Lefort I Osteotomy, Palatal Mocousa, Nerve Recovery.

  15. Fort Lewis electric energy baseline and efficiency resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Secrest, T.J.; Currie, J.W.; DeSteese, J.G.; Dirks, J.A.; Marseille, T.J.; Parker, G.B.; Richman, E.E.; Shankle, S.A.

    1991-10-01

    In support of the US DOE Federal Energy Management Program, the Pacific Northwest Laboratory is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations. Fort Lewis, a US Army installation near Tacoma, Washington, was selected as the pilot site for developing this approach. This site was chosen in conjunction with the interests of the Bonneville Power Administration to develop programs for its federal sector customers and the Army Forces Command to develop an in-house program to upgrade the energy efficiency of its installations. This report documents the electricity assessment portion of the approach, providing an estimate of the electricity use baseline and efficiency improvement potential for major sectors and end uses at the Fort. Although the assessment did not identify all possible efficiency improvement opportunities, it is estimated that electricity use can be reduced by at least 20% cost-effectively at the $0.045/kWh marginal cost of electricity in the Pacific Northwest. 12 refs., 3 figs., 7 tabs.

  16. Strategic Energy Management Plan For Fort Buchanan, Puerto Rico

    Energy Technology Data Exchange (ETDEWEB)

    Parker, Steven A.; Hunt, W. D.

    2001-10-31

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

  17. 77 FR 21448 - Security Zone; 2012 Fleet Week, Port Everglades, Fort Lauderdale, FL

    Science.gov (United States)

    2012-04-10

    ...-AA87 Security Zone; 2012 Fleet Week, Port Everglades, Fort Lauderdale, FL AGENCY: Coast Guard, DHS... waters of Port Everglades in Fort Lauderdale, Florida during 2012 Fleet Week. 2012 Fleet Week will take... Everglades Harbor. The security zone will be enforced while U.S. Navy vessels participating in 2012 Fleet...

  18. 33 CFR 100.740 - Annual Offshore Super Series Boat Race; Fort Myers Beach, FL.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Annual Offshore Super Series Boat Race; Fort Myers Beach, FL. 100.740 Section 100.740 Navigation and Navigable Waters COAST GUARD... Annual Offshore Super Series Boat Race; Fort Myers Beach, FL. (a) Regulated area. (1) The regulated area...

  19. 33 CFR 334.350 - Chesapeake Bay off Fort Monroe, Va.; firing range danger zone.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Chesapeake Bay off Fort Monroe, Va.; firing range danger zone. 334.350 Section 334.350 Navigation and Navigable Waters CORPS OF....350 Chesapeake Bay off Fort Monroe, Va.; firing range danger zone. (a) The danger zone. All of the...

  20. 75 FR 20774 - Establishment of Class E Airspace; Fort A.P. Hill, VA

    Science.gov (United States)

    2010-04-21

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 [Docket No. FAA-2009-0739; Airspace Docket No. 09-AEA-14] Establishment of Class E Airspace; Fort A.P. Hill, VA AGENCY... December 7, 2009 that establishes Class E airspace at Fort A.P. Hill, VA. DATES: Effective Date: 0901 UTC...

  1. Synoptisches Erzählen - Darstellungen des Bombenkriegs bei Gert Ledig, Alexander Kluge und Dieter Forte

    DEFF Research Database (Denmark)

    Hoffmann, Birthe

    2009-01-01

    Artiklen foretager en sammenlignende analyse af Gert Ledigs roman "Vergeltung" (1956), Alexander Kluges hybride tekst "Der Luftangriff auf Halberstadt am 8. April 1945" (1976) og Dieter Fortes roman "Der Junge mit den Blutigen Schuhen" (1995) med henblik på en diskussion af fortællemæssige strate...... strategier overfor bombardementerne af den tyske civilbefolkning under 2. Verdenskrig....

  2. Comparative Demonstration and Evaluation of Classification Technologies: Closed Castner Range, Fort Bliss, Texas

    Science.gov (United States)

    2017-01-23

    DEMONSTRATION REPORT Comparative Demonstration and Evaluation of Classification Technologies: Closed Castner Range Fort Bliss , Texas ESTCP...54  Appendix A: Points of Contact...Detection System 2x2 (TEMTADS) data that was collected by URS Group, Inc. (URS) at the Castner Range (CR) at Fort Bliss , Texas. 1.1 BACKGROUND ESTCP

  3. 78 FR 60929 - Notice of Public Meeting of the Fort Scott Council

    Science.gov (United States)

    2013-10-02

    ... PRESIDIO TRUST Notice of Public Meeting of the Fort Scott Council AGENCY: The Presidio Trust. ACTION: Notice of public meeting of the Fort Scott Council. SUMMARY: Pursuant to the Federal Advisory... Scott Council (Council) will be held from 10 a.m. to 12:30 p.m. on Thursday, October 17, 2013. The...

  4. Rhizoctonia crown and root rot resistance evaluation of Beta PIs in Fort Collins, CO, 2014

    Science.gov (United States)

    Thirty-six sugar beet (Beta vulgaris subsp. vulgaris) germplasm from the USDA-Agricultural Research Service pre-breeding program at Fort Collins, Colorado were screened for resistance to Rhizoctonia crown and root rot (RCRR) at the Colorado State University ARDEC facility in Fort Collins, CO. There...

  5. Sociale fortællinger - statusopdateringers funktion på sociale netværkssites

    DEFF Research Database (Denmark)

    Klastrup, Lisbeth

    2010-01-01

    I artiklen argumenterer internetforsker Lisbeth Klastrup for, at vi kan opfatte statusopdateringen som en ny form for fortællinger, af social og dialogisk karakter. Lisbeth Klastrup beskriver de elementer, der påvirker tilblivelsen og receptionen af sociale fortællinger og samspillet mellem disse...

  6. 76 FR 22338 - Proposed Fort Ross-Seaview Viticultural Area; Comment Period Reopening

    Science.gov (United States)

    2011-04-21

    ... May 9, 2005, from all interested persons. In response to a request from a local wine industry member... the Fort Ross-Seaview viticultural area. Two local wine industry members supported the petition... expressing concern about the potential effect of the proposed viticultural area on his ``Fort Ross'' brand...

  7. Estimating forest structure parameters within Fort Lewis Military Reservation using airborne laser scanner (LIDAR) data.

    Science.gov (United States)

    Hans-Erik Andersen; Jeffrey R. Foster; Stephen E. Reutebuch

    2003-01-01

    Three-dimensional (3-D) forest structure information is critical to support a variety of ecosystem management objectives on the Fort Lewis Military Reservation, including habitat assessment, ecological restoration, fire management, and commercial timber harvest. In particular, the Forestry Program at Fort Lewis requires measurements of shrub, understory, and overstory...

  8. 77 FR 58354 - Bend-Fort Rock Ranger District; Oregon; Withdrawal of Notice for Preparation of an Environmental...

    Science.gov (United States)

    2012-09-20

    ...-Fort Rock Ranger District; Oregon; Withdrawal of Notice for Preparation of an Environmental Impact... Administration, USDOT. ACTION: Notice of withdrawal. SUMMARY: The Bend-Fort Rock Ranger District and FHWA are..., Project Leader, Bend- Fort Rock Ranger District, 63095 Deschutes Market Road, Bend, OR 97701, phone 541...

  9. Intense Terahertz Fields for Fast Energy Release

    Science.gov (United States)

    2016-11-01

    6201 Fort Belvoir, VA 22060-6201 T E C H N IC A L R E P O R T DTRA-TR-17-10 Intense Terahertz Fields for Fast Energy Release...customary unit. Grant #  HDTRA 1-12-1-0044 Intense Terahertz Fields for Fast Energy Release Final Report PI: Keith A. Nelson 617-253-1423 kanelson

  10. Fort St. Vrain graphite site mechanical separation concept selection

    International Nuclear Information System (INIS)

    Berry, S.M.

    1993-09-01

    One of the alternatives to the disposal of the Fort St. Vrain (FSV) reactor spent nuclear fuel involves the separation of the fuel rods composed of compacts from the graphite fuel block assembly. After the separation of these two components, the empty graphite fuel blocks would be disposed of as a low level waste (provided the appropriate requirements are met) and the fuel compacts would be treated as high level waste material. This report deals with the mechanical separation aspects concerning physical disassembly of the FSV graphite fuel element into the empty graphite fuel blocks and fuel compacts. This report recommends that a drilling technique is the preferred choice for accessing the, fuel channel holes and that each hole is drilled separately. This report does not cover any techniques or methods to separate the triso fuel particles from the graphite matrix of the fuel compacts

  11.  Mode, Mediation og Fortætninger

    DEFF Research Database (Denmark)

    Sommerlund, Julie; Jespersen, Astrid Pernille; Jantzen, Laura Sophie

    empirisk kontekst; mode specifikt og det æstetisk-kulturelle felt generelt. Artiklen introducerer begrebet "mediation" (Hennion 1997, 2007) som en indgang til at diskutere teoretiske forbindelser mellem modens æstetik, socialitet og materialitet. Antoine Hennion tilhører en gruppe af post...... og æstetik - i samme empiriske studie - som både eksisterende objekter, og som medierende processer. Mediationsbegrebet peger på denne dobbelthed, men udpeger ikke konkrete måder at begribe relationen mellem de to sider af mediation. I denne sammenhæng afsøger artiklen om en kombination af Hennions...... mediationsbegreb med Laws begreb om "fortætning" (2004) og Latours begreb om "assemblages" (2005) vil kunne bidrage med nye analytiske greb, der udvikler nye måder at beskrive og diskutere smagens og æstetikkens sociomaterialitet og konkrete transformative potentiale.   Empirisk tager artiklen udgangspunkt i mode...

  12. System specification for Fort Hood Solar Cogeneration Facility

    Energy Technology Data Exchange (ETDEWEB)

    1981-05-01

    The characteristics and design and environmental requirements are specified for a solar cogeneration facility at the Fort Hood Army Base in Killeen, Texas. Characteristics of the system and major elements are described, and applicable standards, codes, laws and regulations are listed. Performance requirements for the total system and for each individual subsystem are presented. Survival requirements are given for various environmental extremes, with consideration given to lightning protection and effects of direct or adjacent lightning strikes. Air quality control standards are briefly mentioned. The facility operates in two principal modes: energy collection and energy utilization. The plant is capable of operating in either mode independently or in both modes simultaneously. The system is also operational in transitional and standby/inactive modes. (LEW)

  13. Analysis of natural gas supply strategies at Fort Drum

    International Nuclear Information System (INIS)

    Stucky, D.J.; Shankle, S.A.; Anderson, D.M.

    1992-07-01

    This analysis investigates strategies for Fort Drum to acquire a reliable natural gas supply while reducing its gas supply costs. The purpose of this study is to recommend an optimal supply mix based on the life-cycle costs of each strategy analyzed. In particular, this study is intended to provide initial guidance as to whether or not the building and operating of a propane-air mixing station is a feasible alternative to the current gas acquisition strategy. The analysis proceeded by defining the components of supply (gas purchase, gas transport, supplemental fuel supply); identifying alternative options for each supply component; constructing gas supply strategies from different combinations of the options available for each supply component and calculating the life-cycle costs of each supply strategy under a set of different scenarios reflecting the uncertainty of future events

  14. Fort Hood solar cogeneration facility conceptual design study

    Energy Technology Data Exchange (ETDEWEB)

    1981-05-01

    A study is done on the application of a tower-focus solar cogeneration facility at the US Fort Hood Army Base in Killeen, Texas. Solar-heated molten salt is to provide the steam for electricity and for room heating, room cooling, and domestic hot water. The proposed solar cogeneration system is expected to save the equivalent of approximately 10,500 barrels of fuel oil per year and to involve low development risks. The site and existing plant are described, including the climate and plant performance. The selection of the site-specific configuration is discussed, including: candidate system configurations; technology assessments, including risk assessments of system development, receiver fluids, and receiver configurations; system sizing; and the results of trade studies leading to the selection of the preferred system configuration. (LEW)

  15. Landscape Influences on Headwater Streams on Fort Stewart, Georgia, USA

    Science.gov (United States)

    Jager, Henriette I.; Bevelhimer, Mark S.; King, Roy L.; Smith, Katy A.

    2011-10-01

    Military landscapes represent a mixture of undisturbed natural ecosystems, developed areas, and lands that support different types and intensities of military training. Research to understand water-quality influences of military landscapes usually involves intensive sampling in a few watersheds. In this study, we developed a survey design of accessible headwater watersheds intended to improve our ability to distinguish land-water relationships in general, and training influences, in particular, on Fort Stewart, GA. We sampled and analyzed water from watershed outlets. We successfully developed correlative models for total suspended solids (TSS), total nitrogen (TN), organic carbon (OC), and organic nitrogen (ON), which dominated in this blackwater ecosystem. TSS tended to be greater in samples after rainfall and during the growing season, and models that included %Wetland suggested a "build-and-flush" relationship. We also detected a positive association between TSS and tank-training, which suggests a need to intercept sediment-laden runoff from training areas. Models for OC showed a negative association with %Grassland. TN and ON both showed negative associations with %Grassland, %Wetland, and %Forest. Unexpected positive associations were observed between OC and equipment-training activity and between ON and %Bare ground + Roads. Future studies that combine our survey-based approach with more intensive monitoring of the timing and intensity of training would be needed to better understand the mechanisms for these empirical relationships involving military training. Looking beyond local effects on Fort Stewart streams, we explore questions about how exports of OC and nitrogen from coastal military installations ultimately influence estuaries downstream.

  16. Exploration Drilling and Technology Demonstration At Fort Bliss

    Energy Technology Data Exchange (ETDEWEB)

    Barker, Ben; Moore, Joe [EGI; Segall, Marylin; Nash, Greg; Simmons, Stuart; Jones, Clay; Lear, Jon; Bennett, Carlon

    2014-02-26

    The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration data sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before

  17. ATU/Fort Hood Solar Total Energy Military Large-Scale Experiment (LSE-1): system design and support activities. Final report, November 23, 1976-November 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The ATU/Fort Hood Solar Total Energy System will include a concentrating solar collector field of several acres. During periods of direct insolation, a heat-transfer fluid will be circulated through the collector field and thus heated to 500 to 600/sup 0/F. Some of the fluid will be circulated through a steam generator to drive a turbine-generator set; additional fluid will be stored in insulated tanks for use when solar energy is not available. The electrical output will satisfy a portion of the electrical load at Fort Hood's 87,000 Troop Housing Complex. Heat extracted from the turbine exhaust in the form of hot water will be used for space heating, absorption air conditioning, and domestic water heating at the 87,000 Complex. Storage tanks for the hot water are also included. The systems analysis and program support activities include studies of solar availability and energy requirements at Fort Hood, investigation of interfacing LSE-1 with existing energy systems at the 87,000 Complex, and preliminary studies of environmental, health, and safety considerations. An extensive survey of available concentrating solar collectors and modifications to a computerized system simulation model for LSE-1 use are also reported. Important program support activities are military liaison and information dissemination. The engineering test program reported involved completion of the Solar Engineering Test Module (SETM) and extensive performance testing of a single module of the linear-focusing collector.

  18. Electricity Generation from Geothermal Resources on the Fort Peck Reservation in Northeast Montana

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Garry J. [Gradient Geophysics Inc., Missoula, MT (United States); Birkby, Jeff [Birkby Consulting LLC, Missoula, MT (United States)

    2015-05-12

    Tribal lands owned by Assiniboine and Sioux Tribes on the Fort Peck Indian Reservation, located in Northeastern Montana, overlie large volumes of deep, hot, saline water. Our study area included all the Fort Peck Reservation occupying roughly 1,456 sq miles. The geothermal water present in the Fort Peck Reservation is located in the western part of the Williston Basin in the Madison Group complex ranging in depths of 5500 to 7500 feet. Although no surface hot springs exist on the Reservation, water temperatures within oil wells that intercept these geothermal resources in the Madison Formation range from 150 to 278 degrees F.

  19. Sobre a termodinamica dos buracos negros fortes e suas possiveis aplicações

    OpenAIRE

    Vilson Tonin Zanchin

    1987-01-01

    Resumo: Neste trabalho nós inicialmente fazemos uma revisão de uma teoria unificada das interações gravitacionais e fortes, baseada nos métodos geométricos da Relatividade Geral, segundo a qual hádrons podem ser considerados como soluções "tipo buraco negro" de novas equações de campo propostas para descreverem simultaneamente dois campos métricos tensoriais (o gravitacional ordinário e o 'forte'). [Com o objetivo de estender a termodinâmica de Bekenstein-Hawking aos "buracos negros fortes" (...

  20. Le Fort I osteotomy and low-dose rate Ir192 brachytherapy for treatment of recurrent nasopharyngeal tumours

    International Nuclear Information System (INIS)

    Hall, Charles E.J.; Harris, Robert; A'Hern, Roger; Archer, Daniel J.; Rhys-Evans, Peter; Henk, J. Michael; Harrington, Kevin J.; Nutting, Christopher M.

    2003-01-01

    Background: Treatment of recurrent nasopharyngeal carcinoma is a difficult clinical problem. External beam re-irradiation is associated with a long-term cure in a proportion of cases but this may be associated with severe radiation injury. Methods: Eighteen patients with post-nasal space tumours were treated between 1986 and 2001 with surgical excision and nasopharyngeal brachytherapy via a Le Fort I osteotomy approach. Low-dose rate (LDR) and high-dose rate (HDR) brachytherapy was used. Data was prospectively collected. Local control and overall survival were measured. Acute and late complications were assessed using the RTOG system. Results: The overall survival was 67% at 2 years and 33.5% at 5 years. The corresponding local control rates were 42 and 31.5%, respectively. The T stage at relapse was a significant prognostic factor for local control (P=0.004) but not overall survival. Acute toxicity was mild. RTOG grade ≥3 late complications occurred in 40% of patients treated with the HDR, and 0% treated with LDR. Conclusions: The results of the Le Fort osteotomy, tumour debulking and post-operative brachytherapy gives local control rates similar to those achieved with wide-field re-irradiation. Complication rates are acceptable and are lower than that reported with other methods of radiation therapy. The surgical technique was well tolerated. HDR brachytherapy with this technique had a high complication rate. This approach is a viable option in the treatment of recurrent nasopharyngeal tumours

  1. Performance and economic evaluation of the seahorse natural gas hot water heater conversion at Fort Stewart. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Winiarski, D.W.

    1995-12-01

    The Federal government is the largest single energy consumer in the United States with consumption of nearly 1.5 quads/year of energy (10{sup 15} quad = 1015 Btu) and cost valued at nearly $10 billion annually. The US Department of Energy`s (DOE) Federal Energy Management Program (FEMP) supports efforts to reduce energy use and associated expenses in the Federal sector. One such effort, the New Technology Demonstration Program (NTDP) seeks to evaluate new energy -- saving US technologies and secure their more timely adoption by the US government. Pacific Northwest Laboratory (PNL) is one of four DOE laboratories that participate in the New Technologies Demonstration Program, providing technical expertise and equipment to evaluate new, energy-saving technologies being studied under that program. This report provides the results of a field evaluation that PNL conducted for DOE/FEMP with funding support from the US Department of Defense (DoD) Strategic Environmental Research and Development Program (SERDP) to examine the performance of 4 candidate energy-saving technology-a water heater conversion system to convert electrically powered water heaters to natural gas fuel. The unit was installed at a single residence at Fort Stewart, a US Army base in Georgia, and the performance was monitored under the NTDP. Participating in this effort under a Cooperative Research and Development Agreement (CRADA) were Gas Fired Products, developers of the technology; the Public Service Company of North Carolina; Atlanta Gas Light Company; the Army Corps of Engineers; Fort Stewart; and Pacific Northwest Laboratory.

  2. Demographics of the Golden-cheeked Warbler (Dendroica chrysoparia) on Fort Hood, Texas

    National Research Council Canada - National Science Library

    Jette, Leslie

    1998-01-01

    .... To assist in conservation and recovery of the Golden-cheeked Warbler and comply with the Endangered Species Act, environmental managers need information on the demographic parameters of the population on Fort Hood...

  3. 75 FR 24930 - Fort Bliss (Texas) Army Growth and Force Structure Realignment Final Environmental Impact...

    Science.gov (United States)

    2010-05-06

    ...-PWE, Building 624, Taylor Road, Fort Bliss, TX 79916-6812; e- mail: [email protected] . FOR... Regional Branch Library, 551 Redd Road. In Las Cruces (NM), the New Mexico State University Zuhl Library...

  4. 75 FR 52733 - Record of Decision (ROD) for Fort Bliss Army Growth and Force Structure Realignment

    Science.gov (United States)

    2010-08-27

    ..., Taylor Road, Fort Bliss, TX 79916-6812; e- mail: [email protected] . FOR FURTHER INFORMATION... Library, 551 Redd Road; Las Cruces, NM: New Mexico State University Zuhl Library, 2999 McFie Circle...

  5. National Training Center - Fort Irwin, California. Tribal Consultations Held on 3-5 September 2002

    National Research Council Canada - National Science Library

    Britt, Tad

    2003-01-01

    .... The purpose of the consultation was to establish an open and constructive dialogue between the U.S. Army and those Native American tribes who have cultural resource interests at NTC-Fort Irwin...

  6. 2009 Federal Emergency Management Agency (FEMA) Topographic LiDAR: Fort Kent, Maine

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Camp Dresser McKee Inc. contracted with Sanborn Map Company to provide LiDAR mapping services for Fort Kent, Maine. Utilizing multi-return systems, Light Detection...

  7. A Floristic Inventory and Spatial Database for Fort Wainwright, Interior Alaska

    National Research Council Canada - National Science Library

    Racine, Charles H

    1997-01-01

    An inventory of the vascular and ground-inhabiting cryptogam flora of Fort Wainwright, in interior Alaska, was conducted during the summer of 1995 to support land management needs related to the impact of training...

  8. Quarterly Groundwater Monitoring Third Quarter Sampling Results, Fort Dix, New Jersey

    National Research Council Canada - National Science Library

    1991-01-01

    ...), Fort Dix Follow-on Remedial Investigation/Feasibility Study, prepared by Dames & Moore. The sample containers were labeled, packed on ice in coolers, and shipped overnight with completed chain-of-custody forms to ESE for chemical analysis.

  9. Prometheus unbound: A study of the Dallas/Fort Worth Regional Airport. [Socio-economic considerations

    Science.gov (United States)

    Starling, J. D.; Brown, J.; Dominus, M. I.

    1975-01-01

    The history of the controversies in the development of the Dallas/Fort Worth Regional Airport is detailed. Present technological and organizational management problems are outlined. Maps and illustrations are included.

  10. Energy Engineering Analysis Program Study, Fort Leonard Wood, Missouri. Volume 3, Appendices G and H

    National Research Council Canada - National Science Library

    1993-01-01

    ...) Energy Saving Opportunity Survey (ESOS) at Fort Leonard Wood, Missouri. This study was authorized under the contract DACA41-92-C-0098 with Corps of Engineers Kansas City District, Kansas City, Missouri...

  11. Final Sampling and Analysis Plan for Background Sampling, Fort Sheridan, Illinois

    National Research Council Canada - National Science Library

    1995-01-01

    .... This Background Sampling and Analysis Plan (BSAP) is designed to address this issue through the collection of additional background samples at Fort Sheridan to support the statistical analysis and the Baseline Risk Assessment (BRA...

  12. 77 FR 51064 - Huntington Foam LLC, Fort Smith, AR; Notice of Affirmative Determination Regarding Application...

    Science.gov (United States)

    2012-08-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF LABOR Employment and Training Administration Huntington Foam LLC, Fort Smith, AR; Notice of Affirmative Determination Regarding Application for Reconsideration By application dated May 21, 2012, the State Workforce...

  13. Vendor Payments-Operation Mongoose, Fort Belvoir Defense Accounting Office and Rome Operating Location

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    .... Due to the impending closure of the Defense Accounting Office at Fort Belvoir and the anticipated consolidation to the Rome Operating Location, New York, we did not perform a review of the management...

  14. Freight Advanced Traveler Information System (FRATIS) - Dallas-Fort Worth (DFW) prototype : final report.

    Science.gov (United States)

    This is the Final Report for the FRATIS Dallas-Fort Worth DFW prototype system. The FRATIS prototype in : DFW consisted of the following components: optimization algorithm, terminal wait time, route specific : navigation/traffic/weather, and advanced...

  15. Notification: Hotline Complaint – Drinking Water Treatment Plant at the Fort Belknap Indian Community

    Science.gov (United States)

    Project #OA-FY13-0076, November 13, 2012. On March 22, 2012, the Office of Inspector General (OIG) received a hotline complaint on the construction of the Drinking Water Treatment Plant (DWTP) at the Fort Belknap Indian Community.

  16. Biological Assessment of Streams Associated with the Northern Training Complex at Fort knox, Kentucky, August 2000

    National Research Council Canada - National Science Library

    Payne, Berry

    2001-01-01

    .... The benthic macroinvertebrate aspect of the U.S. Environmental Protection Agency's Rapid Bioassessment Protocol was applied in August 2000 to selected streams likely to be affected by proposed improvements of training facilities on Fort Knox...

  17. Evaluation of the emergency warning system at the Fort St. Vrain nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Sorensen, J.H.

    1982-11-01

    The Fort St. Vrain power plant is the only high-temperature gas-cooled reactor (HTGR) in commercial operation in the United States. All commercial reactors, regardless of technology, must conform to Nuclear Regulatory Commission emergency planning regulations developed in light of Clarification of TMI Action Plan Requirements (NUREG-0737). This report analyzes the applicability of warning-related planning requirements to HTGRs and evaluates the strengths and weaknesses of warning procedures at Fort St. Vrain.

  18. Rumlige fortællinger fra mobilt og web-baseret GIS

    DEFF Research Database (Denmark)

    Møller-Jensen, Lasse

    2009-01-01

    Denne artikel handler om begrebet rumlige fortællinger med anvendelse af fortællingshenvisninger, og disses potentielle rolle ved implementation af fleksible og tematiske turistinformationssystemer. Artiklen fokuserer på brugen af mobile, positionsbekendte enheder, såsom visse PDA'er og smartphon......, samt på web-gis. Der præsenteres to anvendelseseksempler: et fra det centrale København og et fra et område nær Accra, Ghana....

  19. Data Mining the Corporate Dental System of USA DENTAC Fort Bragg

    Science.gov (United States)

    2016-06-10

    Data Mining the Corporate Dental System of USA DENTAC Fort Bragg FREDWIN HOLOMON, D.D.S. B.S. University of...thesis manuscript entitled: Data Mining the Corporate Dental System of USA DENTAC Fort Bragg Is appropriately acknowledged and beyond visual...The present study collected data from the Corporate Dental System encompassing the time period between October 2014 and October 2015. Patient

  20. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  1. Geology of the Orion South kimberlite, Fort à la Corne, Canada

    Science.gov (United States)

    Kjarsgaard, B. A.; Harvey, S.; McClintock, M.; Zonneveld, J. P.; Du Plessis, P.; McNeil, D.; Heaman, L.

    2009-11-01

    A wide variety of primary pyroclastic, volcaniclastic and re-sedimented volcaniclastic deposits derived from multiple kimberlite eruptions are exceptionally well preserved at the Orion South kimberlite body in the Fort à la Corne field in central Saskatchewan. Construction of this kimberlite complex involved episodic kimberlite volcanic events punctuated by periods of volcanic quiescence, erosion and sedimentary deposition within the Western Canadian Sedimentary Basin. The Orion South kimberlite complex erupted into deltaic coastal plain/transitional estuarine (Mannville Group: Cantuar and Pense formations) and shallow marine (Lower Colorado Group: Joli Fou, Viking and Westgate formations) environments. At Orion South, eight distinct kimberlite phases erupted over 6 to 7 million years from ca. 106 Ma (Cantuar Formation equivalent) to ca. 99 Ma (Viking Formation equivalent). Detailed core logging, geochemistry, chronostratigraphy, petrography and geophysics were undertaken to define distinct eruptive phases and reconstruct the depositional environment, volcanic styles and 3-D architecture of the complex. The eight main kimberlite deposits record eruptive styles ranging from magmatic, to 'wet' and 'dry' phreatomagmatic, to submarine eruptions, a consequence of the varying interaction between kimberlite magma and seawater and/or groundwater.

  2. Lateral incisor agenesis predicts maxillary hypoplasia and Le Fort I advancement surgery in cleft patients.

    Science.gov (United States)

    Lai, Li Han; Hui, Brian K; Nguyen, Phuong D; Yee, Kristen S; Martz, Martin G; Bradley, James P; Lee, Justine C

    2015-01-01

    Severe maxillary hypoplasia in cleft patients is caused by a combination of pathogenic and iatrogenic factors. In this work, the authors investigated anatomical deficiencies in dentition for predicting Le Fort I maxillary advancement surgery for severe maxillary hypoplasia in cleft patients. Cleft lip-cleft palate and cleft palate patients older than 14 years of age were reviewed for demographics, dental anomalies, and Le Fort I advancement. Chi-square tests, t tests, and multivariate logistic regression analyses were performed to delineate the contribution of quantity and position of dental agenesis to maxillary advancement surgery. In the 114 patients reviewed (mean age, 19.2 years), 64.0 percent were male patients, 71.9 percent had dental agenesis, and 59.6 percent required Le Fort I advancement. In patients who did not exhibit dental agenesis, 18.8 percent required Le Fort I advancement compared with 74.4 percent of patients with dental agenesis (p agenesis was at the lateral incisor position (p agenesis is an independent predictor for Le Fort I advancement surgery (OR, 4.4; 95 percent CI, 1.42 to 13.64; p = 0.01). Lateral incisor agenesis correlated to maxillary hypoplasia and independently predicted the need for Le Fort I advancement in cleft patients, potentially as an anatomical readout of intrinsic growth deficiency. Risk, III.

  3. Fort St. Vrain fuel-handling system RAM analysis

    International Nuclear Information System (INIS)

    Azizi, S.M.; Berg, G.E.; Burton, J.H.; Durand, R.E.; Larson, E.M.; Pepe, D.J.; Rutherford, P.D.; Novachek, F.J.

    1989-01-01

    Public Service of Company of Colorado (PSC) is planning to decommission its Fort St. Vrain plant in 1990. This requires removal of 1,500 separate assemblies from the core. With the low historical availability of the fuel-handling system (FHS), defueling time was estimated at 36 months. With plant expenses of approximately $1.6 million per month during defueling, this would mean a schedule cost of $58 million. With their contractor, Rockwell International, PSC embarked on a reliability, availability, and maintainability (RAM) analysis to reduce projected defueling time. Key elements included (a) estimating availability of the FHS using a limited historical record, (b) assessing the defueling critical path, and (c) proposing and evaluating design/operational improvements. The most cost-effective improvements are being implemented and are expected to provide a reduction of >18 months in schedule and a net savings of $20 to 25 million. The paper describes the FHS design and operation, major problems associated with fuel-handling operations, and results and recommendations

  4. Fenologia do caquizeiro "Rama Forte'' em clima tropical Phenology of persimmon tree 'Rama Forte' in tropical climate

    Directory of Open Access Journals (Sweden)

    Carlos Eduardo Corsato

    2005-01-01

    Full Text Available O cultivo do caqui (Diospyros kaki L. é uma atividade agrícola importante para pequenos produtores no Brasil. O conhecimento da sua fenologia em clima tropical é de grande importância para o estudo e manejo dessa espécie. O objetivo deste trabalho foi caracterizar os estádios fenológicos da cultivar 'Rama Forte'. O estudo foi realizado no Setor de Horticultura da Escola Superior de Agricultura "Luiz de Queiroz" (ESALQ, em Piracicaba, SP, durante o ciclo 2002/2003. Da brotação das gemas até a abscisão foliar foram caracterizados doze estádios fenológicos. Do intumescimento das gemas no fim do inverno, até o amadurecimento dos frutos no fim do verão passaram-se 203 dias. Do florescimento até o amadurecimento dos frutos transcorreram 169 dias. Ocorreram dois picos no abortamento de frutos. Os primeiros sintomas de senescência das folhas ocorreram aos 60 dias, a partir do término da expansão foliar. Do início da brotação das gemas no fim do inverno, até o completo desfolhamento das plantas, somaram-se 264 dias no decorrer de toda a primavera, verão e outono.Persimmon crop (Diospyros kaki L. is an important agricultural activity to small growers in Brazil. Knowledge about its phenology in tropical climate is very significant to its study and management. This work aimed the characterization of phenologic stages of persimmon tree cultivar 'Rama Forte'. The study was carried out at Horticulture Sector of the Escola Superior de Agricultura "Luiz de Queiroz" (ESALQ, in Piracicaba, State of São Paulo, during the cycle of 2002/2003. Twelve stages were characterized from shoot buds to leaf abscission. Two hundred and three days were taken from buds intumescence, at the end of the winter, to fruit fully ripeness at the end of the summer. One hundred and sixty nine days was the time length from flowering to fruit ripeness. Two distinct peaks of fruit abortion were observed. The first symptoms of leaf senescence appeared sixteen days

  5. The effect of a Le Fort I incision on nose and upper lip dynamics: Unraveling the mystery of the "Le Fort I lip".

    Science.gov (United States)

    Vercruysse, Herman; Van Nassauw, Luc; San Miguel-Moragas, Joan; Lakiere, Eva; Stevens, Sten; Van Hemelen, Geert; Raffaini, Mirco; Nadjmi, Nasser

    2016-12-01

    Postoperative flattening of the upper lip with loss of lip pout and down turning of the corners of the mouth is often seen after Le Fort I surgery. We aim to determine which facial muscles are involved in this phenomenon to update the literature on this subject. In 6 cadavers, a unilateral Le Fort I incision was executed. After removal of the skin, all individual facial muscles were identified and submitted to bilateral tactile traction, comparing incised sides with non-incised sides. All the components of the deep layer of the modiolus alae nasi (transverse part of the nasalis muscle and the myrtiformis muscle) and the deep layer of the midface musculature (levator anguli oris muscle) were transected by the Le Fort I incision. After performing the incision, the majority of the depressor septi nasi is intact. Further, the superficial layer of the midface musculature is intact but it loses tension because of its connection to the deep layer. This study suggests the importance of correctly suturing the deep muscular layers to maintain the 3-dimensional facial contour. Moreover, in this cadaver study, we attempt to predict the functional consequences on the impairment of facial mimics related to the Le Fort I incision. Copyright © 2016 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  6. Comparison of maxillary stability after Le Fort I osteotomy for occlusal cant correction surgery and maxillary advanced surgery.

    Science.gov (United States)

    Ueki, Koichiro; Hashiba, Yukari; Marukawa, Kohei; Yoshida, Kan; Shimizu, Chika; Nakagawa, Kiyomasa; Yamamoto, Etsuhide

    2007-07-01

    To compare postoperative maxillary stability following Le Fort I osteotomy for the correction of occlusal cant as compared with conventional Le Fort I osteotomy for maxillary advancement. The subjects were 40 Japanese adults with jaw deformities. Of these, 20 underwent a Le Fort I osteotomy and intraoral vertical ramus osteotomy (IVRO) to correct asymmetric skeletal morphology and inclined occlusal cant. The other 20 patients underwent a Le Fort I osteotomy and sagittal split ramus osteotomy (SSRO) to advance the maxilla. Lateral and posteroanterior cephalograms were taken postoperatively and assessed statistically. Thereafter, the 2 groups were followed for time-course changes. There was no significant difference between the 2 groups with regard to time-course changes during the immediate postoperative period. This suggests that maxillary stability after Le Fort I osteotomy for cant correction does not differ from that after Le Fort I osteotomy for maxillary advancement.

  7. Slip Potential of Faults in the Fort Worth Basin

    Science.gov (United States)

    Hennings, P.; Osmond, J.; Lund Snee, J. E.; Zoback, M. D.

    2017-12-01

    Similar to other areas of the southcentral United States, the Fort Worth Basin of NE Texas has experienced an increase in the rate of seismicity which has been attributed to injection of waste water in deep saline aquifers. To assess the hazard of induced seismicity in the basin we have integrated new data on location and character of previously known and unknown faults, stress state, and pore pressure to produce an assessment of fault slip potential which can be used to investigate prior and ongoing earthquake sequences and for development of mitigation strategies. We have assembled data on faults in the basin from published sources, 2D and 3D seismic data, and interpretations provided from petroleum operators to yield a 3D fault model with 292 faults ranging in strike-length from 116 to 0.4 km. The faults have mostly normal geometries, all cut the disposal intervals, and most are presumed to cut into the underlying crystalline and metamorphic basement. Analysis of outcrops along the SW flank of the basin assist with geometric characterization of the fault systems. The interpretation of stress state comes from integration of wellbore image and sonic data, reservoir stimulation data, and earthquake focal mechanisms. The orientation of SHmax is generally uniform across the basin but stress style changes from being more strike-slip in the NE part of the basin to normal faulting in the SW part. Estimates of pore pressure come from a basin-scale hydrogeologic model as history-matched to injection test data. With these deterministic inputs and appropriate ranges of uncertainty we assess the conditional probability that faults in our 3D model might slip via Mohr-Coulomb reactivation in response to increases in injected-related pore pressure. A key component of the analysis is constraining the uncertainties associated with each of the principal parameters. Many of the faults in the model are interpreted to be critically-stressed within reasonable ranges of uncertainty.

  8. Habitat restoration/enhancement Fort Hall Reservation : 2001 annual report

    International Nuclear Information System (INIS)

    Moser, David C.

    2003-01-01

    Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2001. Enhancement and protection included sloping, fencing and planting willows at sites on Diggie Creek, Clear Creek and Spring Creek. In addition, many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). In 2001, exclosure fences were erected on Diggie Creek (250 m barbed wire; (70 m jack), Wood Creek (500 m jack), Clear Creek (20 m jack), Ross Fork Creek (200 m jack), West Fork Creek (200 m jack)) and the Portneuf River (1 km barbed wire; 100 m jack). Jack and rail exclosure fences that had deteriorated over the past ten years were repaired at numerous areas throughout the Reservation. Physical sampling during 2001 included sediment and depth surveys (SADMS) in Big Jimmy Creek and Diggie Creek. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for eight and nine strata in the Big Jimmy and Diggie Creek, respectively. Baseline SADM data was collected in Diggie Creek to monitor the effects of bank sloping and revegetation on channel morphology and sediment levels through time. Water temperature was monitored (hourly) in Spring Creek, Clear Creek, Ross Fork Creek and Big Jimmy Creek. Biotic sampling included invertebrate sampling in the 200 and 300 series of Clear Creek. Fish population densities and biomass were sampled in Clear Creek 200 and 300 series. Sampling protocols were identical to methods used in past years. Numbers of fish in Clear Creek 300 series remained similar to 2000 while numbers of fish in Clear Creek 200 series dropped to near pre project levels. Salmonid fry densities were monitored near Broncho Bridge and were significantly higher than 2000. A mark-recapture study was initiated in spring 2001 to estimate numbers of spawning adults using the Head End of Spring Creek

  9. A novel model surgery technique for LeFort III advancement.

    Science.gov (United States)

    Vachiramon, Amornpong; Yen, Stephen L-K; Lypka, Michael; Bindignavale, Vijay; Hammoudeh, Jeffrey; Reinisch, John; Urata, Mark M

    2007-09-01

    Current techniques for model surgery and occlusal splint fabrication lack the ability to mark, measure and plan the position of the orbital rim for LeFort III and Monobloc osteotomies. This report describes a model surgery technique for planning the three dimensional repositioning of the orbital rims. Dual orbital pointers were used to mark the infraorbital rim during the facebow transfer. These pointer positions were transferred onto the surgical models in order to follow splint-determined movements. Case reports are presented to illustrate how the model surgery technique was used to differentiate the repositioning of the orbital rim from the occlusal correction in single segment and combined LeFort III/LeFort I osteotomies.

  10. Worldwide C-17 Availability to Support 82nd Airborne Operations from Fort Bragg/Pope Field

    Science.gov (United States)

    2016-11-06

    and LTC Jason W. Condrey of Army Forces Command for their support and input throughout the project. We must also thank Army Forces Command for its...Improvement Program kt knots LIMS -EV Logistics, Installations, Mission Support-Enterprise View nm nautical miles PMC partially mission capable USAF...Mission Support-Enterprise View ( LIMS -EV) that give the location and status of the C-17 fleet. Chapter 4 analyzes the model output focused on a heatmap of

  11. 77 FR 3324 - Release of Airport Property: Page Field, Fort Myers, FL

    Science.gov (United States)

    2012-01-23

    ... released of its federal obligations to sell the property at Fair Market Value to Lee County for municipal purposes. The appraised Fair Market Value of the parcel is $64,628. Documents reflecting the Sponsor's...

  12. Field Testing and Load Rating Report, Bridge FSBR-514, Fort Shafter, Hawaii

    Science.gov (United States)

    2009-05-01

    moment ratio will equal 1.0. If a fixity term is defined as the ratio (Me/Mm), which ranges from 0 to 100 percent, a more conceptual measure of end...restraint can be obtained. The next step is to relate the fixity term to the actual spring stiffness (Kr). The degree to which the Kr effects the... fixity term depends on the beam or slab stiffness to which the spring is attached. Therefore the fixity term must be related to the ratio of the beam

  13. Relative risk site evaluation for buildings 7740 and 7741 Fort Campbell, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    Last, G.V.; Gilmore, T.J.; Bronson, F.J.

    1998-01-01

    Buildings 7740 and 7741 are a part of a former nuclear weapon`s storage and maintenance facility located in the southeastern portion of Fort Campbell, Kentucky. This underground tunnel complex was originally used as a classified storage area beginning in 1949 and continuing until 1969. Staff from the Pacific Northwest National Laboratory recently completed a detailed Relative Risk Site Evaluation of the facility. This evaluation included (1) obtaining engineering drawings of the facility and associated structures, (2) conducting detailed radiological surveys, (3) air sampling, (4) sampling drainage systems, and (5) sampling the underground wastewater storage tank. Ten samples were submitted for laboratory analysis of radionuclides and priority pollutant metals, and two samples submitted for analysis of volatile organic compounds. No volatile organic contaminants were detected using field instruments or laboratory analyses. However, several radionuclides and metals were detected in water and/or soil/sediment samples collected from this facility. Of the radionuclides detected, only {sup 226}Ra may have come from facility operations; however, its concentration is at least one order of magnitude below the relative-risk comparison value. Several metals (arsenic, beryllium, cadmium, copper, mercury, lead, and antimony) were found to exceed the relative-risk comparison values for water, while only arsenic, cadmium, and lead were found to exceed the relative risk comparison values for soil. Of these constituents, it is believed that only arsenic, beryllium, mercury, and lead may have come from facility operations. Other significant hazards posed by the tunnel complex include radon exposure and potentially low oxygen concentrations (<19.5% in atmosphere) if the tunnel complex is not allowed to vent to the outside air. Asbestos-wrapped pipes, lead-based paint, rat poison, and possibly a selenium rectifier are also present within the tunnel complex.

  14. En pose blandet slik - fortællinger om livet som plejebarn

    DEFF Research Database (Denmark)

    Warming, H.

    Bogen handler om livet som plejebarn på godt og ondt - som børnene selv oplever og fortæller om det. En rød tråd i fortællingerne er, at uanset hvor ked af det eller glad, man er for at være i pleje, føler stort set alle plejebørn sig anderledes end deres kammerater, omend i større eller mindre o...

  15. Facility Energy Decision System (FEDS) Assessment Report for Fort Buchanan, Puerto Rico

    Energy Technology Data Exchange (ETDEWEB)

    Chvala, William D.; Solana, Amy E.; Dixon, Douglas R.

    2005-02-01

    This report documents the findings of the Facility Energy Decision System (FEDS) assessment at Fort Buchanan, Puerto Rico, by a team of PNNL engineers under contract to the Installation Management Agency (IMA) Southeast Region Office (SERO). Funding support was also provided by the Department of Energy's Federal Energy Management Program. The purpose of the assessment was to determine how energy is consumed at Fort Buchanan, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

  16. Dust Plume Modeling at Fort Bliss: Move-Out Operations, Combat Training and Wind Erosion

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Elaine G.; Rishel, Jeremy P.; Rutz, Frederick C.; Seiple, Timothy E.; Newsom, Rob K.; Allwine, K Jerry

    2006-09-29

    The potential for air-quality impacts from heavy mechanized vehicles operating in the training ranges and on the unpaved main supply routes at Fort Bliss was investigated. This report details efforts by the staff of Pacific Northwest National Laboratory for the Fort Bliss Directorate of Environment in this investigation. Dust emission and dispersion from typical activities, including move outs and combat training, occurring on the installation were simulated using the atmospheric modeling system DUSTRAN. Major assumptions associated with designing specific modeling scenarios are summarized, and results from the simulations are presented.

  17. Slaget ved Vejle og andre fortællinger fra Jyske Bank

    DEFF Research Database (Denmark)

    Albrechtsen, Charlotte

    Storytelling som ledelsesværktøj er en form for retorik idet formålet med at bruge fortællinger i kommunikationen fra ledelse til medarbejdere er at påvirke modtagerne/medarbejderne. Imidlertid er refleksioner over modtagerinstansen så godt som fraværende både i den populære debat om storytelling...... og i den eksisterende forskning i emnet. Foruden at introducere til forskningen i storytelling præsenterer artiklens forfatter, som er ph.d.-studerende, en modtagerorienteret analyse af en fortælling fra Jyske Bank....

  18. Surgical risk factors and maxillary nerve function after le fort I osteotomy

    DEFF Research Database (Denmark)

    Thygesen, Torben Henrik; Jensen, Allan Bardow; Norholt, SE

    2009-01-01

    PURPOSE: Data on intraoperative risk factors for long-term postoperative complications after Le Fort I osteotomy (LFO) are limited. The aim of this study was to describe prospectively the overall postoperative changes in maxillary nerve function after LFO, and to correlate these changes with a nu......PURPOSE: Data on intraoperative risk factors for long-term postoperative complications after Le Fort I osteotomy (LFO) are limited. The aim of this study was to describe prospectively the overall postoperative changes in maxillary nerve function after LFO, and to correlate these changes...

  19. Airborne electromagnetic data and processing within Leach Lake Basin, Fort Irwin, California: Chapter G in Geology and geophysics applied to groundwater hydrology at Fort Irwin, California

    Science.gov (United States)

    Bedrosian, Paul A.; Ball, Lyndsay B.; Bloss, Benjamin R.

    2014-01-01

    From December 2010 to January 2011, the U.S. Geological Survey conducted airborne electromagnetic and magnetic surveys of Leach Lake Basin within the National Training Center, Fort Irwin, California. These data were collected to characterize the subsurface and provide information needed to understand and manage groundwater resources within Fort Irwin. A resistivity stratigraphy was developed using ground-based time-domain electromagnetic soundings together with laboratory resistivity measurements on hand samples and borehole geophysical logs from nearby basins. This report releases data associated with the airborne surveys, as well as resistivity cross-sections and depth slices derived from inversion of the airborne electromagnetic data. The resulting resistivity models confirm and add to the geologic framework, constrain the hydrostratigraphy and the depth to basement, and reveal the distribution of faults and folds within the basin.

  20. Fra erfaringer til betydninger: Tolkning af fortællinger om eksamensgruppebegivenheder fra folkeskolelærerstuderende ved Aalborg Seminarium

    DEFF Research Database (Denmark)

    Silleborg, Ellen

    2004-01-01

    karakter. Denne situation giveruoverensstemmelser i de studerendes følelsesliv, og hovedparten af fortællingerne afspejler en i mange henseender konfliktfyldt eksamensgruppeproces. I fortællingernes betydninger ses en loyal men privatiseret etik, hvor ansvarlighed bliver til selvskyld. Alle implicerede...

  1. 78 FR 18314 - Foreign-Trade Zone (FTZ) 39-Dallas-Fort Worth, Texas; Notification of Proposed Production...

    Science.gov (United States)

    2013-03-26

    ...-Fort Worth, Texas; Notification of Proposed Production Activity; CSI Calendering, Inc. (Rubber Coated Textile Fabric); Arlington, Texas The Dallas/Fort Worth International Airport Board, grantee of FTZ 39, submitted a notification of proposed production activity to the FTZ Board on behalf of CSI Calendering, Inc...

  2. 76 FR 34799 - Permanent Dam Safety Modification at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams, TN

    Science.gov (United States)

    2011-06-14

    ... TENNESSEE VALLEY AUTHORITY Permanent Dam Safety Modification at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams, TN AGENCY: Tennessee Valley Authority. ACTION: Notice of intent. SUMMARY: This... existing dam facilities at Cherokee, Fort Loudoun, Tellico, and Watts Bar dams in Tennessee. The level of...

  3. 78 FR 78380 - Notice of Inventory Completion: U.S. Department of the Interior, National Park Service, Fort...

    Science.gov (United States)

    2013-12-26

    ... completion of an inventory of human remains under the control of Fort Bowie National Historic Site, Bowie, AZ....R50000] Notice of Inventory Completion: U.S. Department of the Interior, National Park Service, Fort... completed an inventory of human remains, in consultation with the appropriate Indian tribes or Native...

  4. 77 FR 20046 - Establishment of the Gateway National Recreation Area Fort Hancock 21st Century Advisory Committee

    Science.gov (United States)

    2012-04-03

    ... DEPARTMENT OF THE INTERIOR [NPS-NERO-GATE-0112-9494; 1770-OZC] Establishment of the Gateway... announcing the establishment of the Gateway National Recreation Area Fort Hancock 21st Century Advisory... Fort Hancock Historic Landmark District of Gateway National Recreation area. The Department of the...

  5. 77 FR 37318 - Eighth Coast Guard District Annual Safety Zones; Sound of Independence; Santa Rosa Sound; Fort...

    Science.gov (United States)

    2012-06-21

    ...-AA00 Eighth Coast Guard District Annual Safety Zones; Sound of Independence; Santa Rosa Sound; Fort... Coast Guard will enforce a Safety Zone for the Sound of Independence event in the Santa Rosa Sound, Fort... during the Sound of Independence. During the enforcement period, entry into, transiting or anchoring in...

  6. USDA-ARS germplasm evaluated for resistance to Rhizoctonia crown and root rot in Fort Collins, CO, 2014

    Science.gov (United States)

    Thirty-six sugar beet (Beta vulgaris subsp. vulgaris) germplasm from the USDA-Agricultural Research Service pre-breeding program at Fort Collins, Colorado were screened for resistance to Rhizoctonia crown and root rot (RCRR) at the Colorado State University ARDEC facility in Fort Collins, CO. There...

  7. Sugar beet breeding lines evaluated for resistance to Rhizoctonia crown and root rot in Fort Collins, CO, 2015

    Science.gov (United States)

    Thirty-nine beet sugar beet breeding lines (Beta vulgaris subsp. vulgaris) from the USDA-Agricultural Research Service breeding program at Fort Collins, CO, were screened for resistance to Rhizoctonia crown and root rot (Rcrr) at the Colorado State University ARDEC facility in Fort Collins, CO. The...

  8. National Training Center-Fort Irwin, California. Native American Consultation Meeting at Fort Mojave, Nevada, Held on 2-3 October 2003

    Science.gov (United States)

    2004-08-01

    National Training Center at Fort Irwin is located 37 miles northeast of Bar - stow, California, and is a U.S. Army installation (see Figure 1). The base is...MR. RAYE : George Raye of the Colorado 5 River Indian Tribe. 6 MR. BILL SMITH: Bill Smith, I’m a member 7 of...construction, barring any unforseen findings out there, 3 we anticipate starting this construction in the spring 4 of 󈧈, and probably about

  9. An Ecological Land Survey for Fort Richardson, Alaska

    National Research Council Canada - National Science Library

    Jorgenson, M

    2003-01-01

    ... a consistent conceptual framework for ecological applications. Field surveys at 132 plots along 16 toposequences and at 99 other plots were used to identify relationships among physiography, geomorphology, soils, hydrology, and vegetation...

  10. Fort Gordon Boiler/Chiller. Volume I, Narrative Report

    National Research Council Canada - National Science Library

    1991-01-01

    .... The purpose of this report is to indicate the work accomplished to date, show samples of field data collected, illustrate the methods and justifications of the approaches taken, outline the present...

  11. 33 CFR 165.1314 - Safety Zone; Fort Vancouver Fireworks Display, Columbia River, Vancouver, Washington.

    Science.gov (United States)

    2010-07-01

    ... Fireworks Display, Columbia River, Vancouver, Washington. 165.1314 Section 165.1314 Navigation and Navigable... Thirteenth Coast Guard District § 165.1314 Safety Zone; Fort Vancouver Fireworks Display, Columbia River... the point of origin. (b) Regulations. In accordance with the general regulations in § 165.23 of this...

  12. 76 FR 62835 - Notice of Inventory Completion: Fort Lewis College, Durango, CO

    Science.gov (United States)

    2011-10-11

    ... found along Rim Drive (County Road 239), near the Fort Lewis College Campus on City of Durango land... context is a Basketmaker III (7th century A.D.) pithouse, based on architecture, artifacts, and non... present. The temporal context of the site is the Pueblo I period (A.D. 700- 840) based on other artifacts...

  13. Conceptual design report for the mechanical disassembly of Fort St. Vrain fuel elements

    International Nuclear Information System (INIS)

    Lord, D.L.; Wadsworth, D.C.; Sekot, J.P.; Skinner, K.L.

    1993-04-01

    A conceptual design study was prepared that: (1) reviewed the operations necessary to perform the mechanical disassembly of Fort St. Vrain fuel elements; (2) contained a description and survey of equipment capable of performing the necessary functions; and (3) performed a tradeoff study for determining the preferred concepts and equipment specifications. A preferred system was recommended and engineering specifications for this system were developed

  14. At fortælle historie - Litterære strategier i historieskrivningen

    DEFF Research Database (Denmark)

    Søndergaard, Leif

    2012-01-01

    Ny fortællende strømning i historieskrivningen. Teoretisk udgangspunkt i Hayden White og Paul Ricoeur m.fl. Hisorikerne bruger narrative og litterære virkemidler i deres fremstilling med sigte på et større publikum end faghistorikere. Samtidig fastholdes den historiske kildekritiske diskurs...

  15. 77 FR 36573 - DRAFT General Management Plan and Draft Environmental Impact Statement, Fort Matanzas National...

    Science.gov (United States)

    2012-06-19

    ... request a copy, contact Fort Matanzas National Monument Superintendent Gordie Wilson, One South Castillo... Castillo Drive, St. Augustine, FL, 32804. Finally, you may hand-deliver comments to the monument. Before..., One South Castillo Drive, St. Augustine, FL 32804 or telephone at (904) 829-6506, ext. 221. The...

  16. 75 FR 17691 - Foreign-Trade Zone 196 - Fort Worth, Texas, Application for Manufacturing Authority, ATC...

    Science.gov (United States)

    2010-04-07

    ... Worth, Texas, Application for Manufacturing Authority, ATC Logistics & Electronics (Cell Phone Kitting... Board (the Board) by ATC Logistics & Electronics (ATCLE), operator of Site 2, FTZ 196, Fort Worth, Texas.... Executive Secretary. [FR Doc. 2010-7886 Filed 4-6-10; 8:45 am] BILLING CODE 3510-DS-S ...

  17. 78 FR 72706 - Notice of Inventory Completion: Colorado State University, Fort Collins, CO

    Science.gov (United States)

    2013-12-03

    ... in this notice by January 2, 2014. ADDRESSES: Christopher Green, Colorado State University, B-218 Clark Building, c/o Christopher Green, 1787 Campus Delivery, Fort Collins, CO 80525, telephone (970) 213... property on Lightening Hill (site 5LR284) in Larimer County, CO. The site was discovered and excavated by...

  18. Wooden combs from the Roman fort at Vechten: the bodily appearance of soldiers

    NARCIS (Netherlands)

    Derks, A.M.J.; Vos, W.K.

    2010-01-01

    Abstract Excavations in the late 19th century and surveys carried out in the 1970s have produced 12 boxwood combs from the Roman fort at Vechten (NL). They are to be considered waste material that was dumped in the river Rhine which in the Roman period ran just north of the camp. In this article,

  19. Inicial nasal mucosa detachment using piezoelectric device in the Le Fort I osteotomy: A technical note

    OpenAIRE

    Shinohara, Elio Hitoshi; Kaba, Shajadi Carlos Pardo; Ruiz, Marcelo Martinson; Horikawa, Fernando Kendi

    2013-01-01

    In maxillary Le Fort I type osteotomy the detachment of the nasal mucosa should be done carefully. Piezoelectric surgery contributed much to increase the safety of osteotomies, despite the initial advantage of minimizing the risk of injury in nervous tissue, mainly in bilateral sagittal split osteotomy; we use the piezoelectric device for the initial detachment of the nasal mucosa in the maxillary osteotomy.

  20. Evaluation of benign paroxysmal positional vertigo following Le Fort I osteotomy.

    Science.gov (United States)

    Deniz, K; Akdeniz, S S; Koç, A Ö; Uçkan, S; Ozluoğlu, L N

    2017-03-01

    The Le Fort I osteotomy is widely used to correct dentofacial deformities. Benign paroxysmal positional vertigo (BPPV) is a common vestibular end organ disorder characterized by short, often recurrent episodes of vertigo. Head trauma is one of the known causes of BPPV. During pterygoid osteotomy, the surgical trauma induced by percussion with the surgical mallet and osteotomes can displace otoliths into the semicircular canal, resulting in BPPV. The aim of this study was to evaluate the potential risk of occurrence of BPPV in individuals undergoing Le Fort I osteotomy. Twenty-three patients were included in this study. The Dix-Hallpike manoeuvre, positional tests using electronystagmography, and vestibular evoked myogenic potential (VEMP) tests were performed 1 week before surgery (T0), 1 week after surgery (T1), and 1 month after surgery (T2). The results were compared statistically. BPPV was observed in three patients. Eleven patients had nystagmus at the T1 evaluation and seven at the T2 evaluation. The difference between the T0 and T1 time points was statistically significant (P=0.001). BPPV is a possible complication of Le Fort I osteotomy. Surgeons should be aware of this complication, and the diagnosis of BPPV should be considered in patients who have undergone Le Fort I osteotomy. Copyright © 2016 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

  1. Historical Analysis of Land Cover/Condition Trends at Fort Bliss, Texas, Using Remotely Sensed Imagery

    National Research Council Canada - National Science Library

    Tweddale, Scott

    2001-01-01

    .... They need a cost-effective method of assessing and monitoring land condition. The objective of this research was to characterize the small scale, gross level change in land condition on a selected area of Fort Bliss over a 23-year period...

  2. 78 FR 50103 - Notice of Inventory Completion: Colorado State University, Fort Collins, CO

    Science.gov (United States)

    2013-08-16

    ...), 25 U.S.C. 3003, of the completion of an inventory of human remains under the control of Colorado....R50000] Notice of Inventory Completion: Colorado State University, Fort Collins, CO AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: Colorado State University has completed an inventory of human...

  3. 78 FR 59960 - Notice of Inventory Completion: Colorado State University, Fort Collins, CO

    Science.gov (United States)

    2013-09-30

    ...), 25 U.S.C. 3003, of the completion of an inventory of human remains under the control of Colorado....R50000] Notice of Inventory Completion: Colorado State University, Fort Collins, CO AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: Colorado State University has completed an inventory of human...

  4. Biology and ecology of sickleweed (Falcaria vulgaris) in the Fort Pierre National Grassland of South Dakota

    Science.gov (United States)

    Brian L. Korman

    2011-01-01

    In the last two decades the exotic plant sickleweed (Falcaria vulgaris Bernh., Apiaceae) has invaded, and come to dominate, large areas of the Fort Pierre National Grassland (FPNG) in central South Dakota, USA. Currently sickleweed is estimated to infest over 3200 ha of FPNG. The purpose of this study was to examine several of the biological and ecological traits that...

  5. Notes on Chameleons IV. A New Chameleon, from the Miocene of Fort Ternan, Kenya (Chamaeleonidae, Reptilia)

    NARCIS (Netherlands)

    Hillenius, D.

    1978-01-01

    A new, fossil chameleon is described, † Chamaeleo intermedius, found on the surface at Fort Ternan, Kenya. Most probably it eroded from a layer of fossilized lahar, close to 14 million years old. † Chamaeleo intermedius possesses characters which still occur in recent chameleons, in fact it combines

  6. 75 FR 40034 - Northeastern Tributary Reservoirs Land Management Plan, Beaver Creek, Clear Creek, Boone, Fort...

    Science.gov (United States)

    2010-07-13

    ... TENNESSEE VALLEY AUTHORITY Northeastern Tributary Reservoirs Land Management Plan, Beaver Creek...-managed public land on Beaver Creek, Clear Creek, Boone, Fort Patrick Henry, South Holston, Watauga, and.... Watauga and Wilbur reservoirs are along the Watauga River. Beaver Creek and Clear Creek reservoirs are on...

  7. Distribution and habitat of the western gray squirrel (Sciurus griseus) on Fort Lewis, Washington.

    Science.gov (United States)

    L.A. Ryan; A.B. Carey

    1995-01-01

    Sciurus griseus has been accorded a "threatened" status by the Washington Department of Wildlife. Our objectives were to determine the distribution, abundance, and factors limiting the abundance of Sciurus griseus on Fort Lewis. Between June 1992 and August 1993 we conducted walking surveys for squirrels in 169 oak-...

  8. Fort Independence: An Eighteenth-Century Frontier Homesite and Militia Post in South Carolina.

    Science.gov (United States)

    1982-12-01

    twelve fragments of a purpled , heavy, clear glass water goblet with a thick stem and foot; a couple of pieces from the neck of a clear glass jug of...proximity to source of supply of bottled spirits rather than to the hypothesis that soldiers drank more. With Fort Independence similarly inclined

  9. Limited Energy Study. Thermal Storage at Central Chilled Water Plant, Fort Leonard Wood, Missouri

    National Research Council Canada - National Science Library

    1996-01-01

    The Scope of Work (See Appendix A) called for the study of the economic feasibility of providing a cold thermal storage system at the central chiller plant serving the Fort Leonard Wood 600 Area in order to reduce electrical demand charges...

  10. Management of Groin Abcess with Flaminal Forte and KerraMax Care

    Directory of Open Access Journals (Sweden)

    Maggie Pugh

    2016-04-01

    Full Text Available The patient’s dressing plan using Flaminal Forte and KerraMax Care successfully managed the complexities of his wound, absorbing exudate, reducing pain on dressing, malodour and wound bioburden. Moreover, the plan encouraged patient concordance, reduced nursing consultation time and subsequently altered treatment plans for our patients with abscesses

  11. Simulation of selected ground-water pumping scenarios at Fort Stewart and Hunter Army Airfield, Georgia

    Science.gov (United States)

    Cherry, Gregory S.

    2006-01-01

    A regional MODFLOW ground-water flow model of parts of coastal Georgia, Florida, and South Carolina was used to evaluate the effects of current and hypothetical groundwater withdrawal, and the relative effects of pumping in specific areas on ground-water flow in the Upper Floridan aquifer near Fort Stewart and Hunter Army Airfield (HAAF), coastal Georgia. Simulation results for four steady-state pumping scenarios were compared to each other and to a Base Case condition. The Base Case represents year 2000 pumping rates throughout the model area, with the exception that permitted annual average pumping rates for the year 2005 were used for 26 production wells at Fort Stewart and HAAF. The four pumping scenarios focused on pumping increases at HAAF resulting from projected future demands and additional personnel stationed at the facility and on reductions in pumping at Fort Stewart. Scenarios A and B simulate 1- and 2-million-gallon-perday (Mgal/d) increases, respectively, at HAAF. Simulated water-level change maps for these scenarios indicate an area of influence that extends into parts of Bryan, Bulloch, Chatham, Effingham, and Liberty Counties, Ga., and Beaufort and Jasper Counties, S.C., with maximum drawdowns from 0.5 to 4 feet (ft) for scenario A and 1 to 8 ft for Scenario B. For scenarios C and D, increases in pumping at HAAF were offset by decreases in pumping at Fort Stewart. Scenario C represents a 1-Mgal/d increase at HAAF and a 1-Mgal/d decrease at Fort Stewart; simulated water-level changes range from 0.4 to -4 ft. Scenario D represents a 2-Mgal/d increase at HAAF and 2-Mgal/d decrease at Fort Stewart; simulated water-level changes range from 0.04 to -8 ft. The simulated water-level changes indicate an area of influence that extends into parts of Bryan, Bulloch, Chatham, Effingham, Liberty, and McIntosh Counties, Ga., and Jasper and Beaufort Counties, S.C. In general, decreasing pumping at Fort Stewart by an equivalent amount to pumping increases at HAAF

  12. Fort Scott Lake Cultural Resource Study. Part 2. Historical and Architectural Field Survey of a Portion of Fort Scott Lake Project, Bourbon County, Kansas

    Science.gov (United States)

    1989-01-01

    is the use of a Mansard roof on top of a two or three-story square shaped-building. The roof usually has wall dormers and often has roof cresting...weighted down with undigested Old World styles. Mansard roofs bristled with wrought iron, towers sprouted from saw-tooth gables, and sharp-eaved dormer

  13. Third party testing : new pilot facility for mining processes opens in Fort McKay

    International Nuclear Information System (INIS)

    Jaremko, D.

    2007-01-01

    Fort McKay lies 65 kilometres north of Fort McMurray, Alberta and is the centre of operational oilsands mining activity. As such, it was chosen for a pilot testing facility created by the Geneva-based SGS Group. The reputable facility provides an opportunity for mining producers to advance their processes, including environmental performance, by allowing them to test different processes on their own oilsands. The Northern Lights partnership, led by Synenco Energy, was the first client at the facility. Due to outsourcing, clients are not obligated to make substantial capital investment into in-house research. The Northern Lights partnership will be using the facility to test extraction processes on bitumen from its leases. Although the Fort McKay facility is SGS's first venture into the oilsands industry, it operates in more than 140 companies globally, including the mineral industry, and specializes in inspection, verification, testing and certification. SGS took the experience from its minerals extraction business to identify what could be done to help the oilsands industry by using best practices developed from global operations. The facility lies on the Fort McKay industrial park owned by the Fort McKay First Nation. An existing testing facility called McMurray Resources Research and Testing was expanded by the SGS Group to include environmental analysis capabilities. The modular units that lie on 6 acres include refrigerated ore storage to maintain ore integrity; modular ore and materials handling systems; extraction equipment; and, zero discharge process water and waste disposal systems. Froth treatment will be added in the near future to cover the entire upstream side of the mining processing business. A micro-upgrader might be added in the future to manufacture synthetic crude. 3 figs

  14. Fort Lewis natural gas and fuel oil energy baseline and efficiency resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Brodrick, J.R. [USDOE, Washington, DC (United States); Daellenbach, K.K.; Parker, G.B.; Richman, E.E.; Secrest, T.J.; Shankle, S.A. [Pacific Northwest Lab., Richland, WA (United States)

    1993-02-01

    The mission of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to lead the improvement of energy efficiency and fuel flexibility within the federal sector. Through the Pacific Northwest Laboratory (PNL), FEMP is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations; this procedure is entitled the Federal Energy Decision Screening (FEDS) system. Through a cooperative program between FEMP and the Army Forces Command (FORSCOM) for providing technical assistance to FORSCOM installations, PNL has been working with the Fort Lewis Army installation to develop the FEDS procedure. The natural gas and fuel oil assessment contained in this report was preceded with an assessment of electric energy usage that was used to implement a cofunded program between Fort Lewis and Tacoma Public Utilities to improve the efficiency of the Fort`s electric-energy-using systems. This report extends the assessment procedure to the systems using natural gas and fuel oil to provide a baseline of consumption and an estimate of the energy-efficiency potential that exists for these two fuel types at Fort Lewis. The baseline is essential to segment the end uses that are targets for broad-based efficiency improvement programs. The estimated fossil-fuel efficiency resources are estimates of the available quantities of conservation for natural gas, fuel oils {number_sign}2 and {number_sign}6, and fuel-switching opportunities by level of cost-effectiveness. The intent of the baseline and efficiency resource estimates is to identify the major efficiency resource opportunities and not to identify all possible opportunities; however, areas of additional opportunity are noted to encourage further effort.

  15. Shale depositional processes: Example from the Paleozoic Barnett Shale, Fort Worth Basin, Texas, USA

    Science.gov (United States)

    Abouelresh, Mohamed; Slatt, Roger

    2011-12-01

    A long held geologic paradigm is that mudrocks and shales are basically the product of `hemipelagic rain' of silt- and/or clay-sized, detrital, biogenic and particulate organic particles onto the ocean floor over long intervals of time. However, recently published experimental and field-based studies have revealed a plethora of micro-sedimentary features that indicate these common fine-grained rocks also could have been transported and/or reworked by unidirectional currents. In this paper, we add to this growing body of knowledge by describing such features from the Paleozoic Barnett Shale in the Fort Worth Basin, Texas, U.S.A. which suggests transport and deposition was from hyperpycnal, turbidity, storm and/or contour currents, in addition to hemipelagic rain. On the basis of a variety of sedimentary textures and structures, six main sedimentary facies have been defined from four 0.3 meter intervals in a 68m (223 ft) long Barnett Shale core: massive mudstone, rhythmic mudstone, ripple and low-angle laminated mudstone, graded mudstone, clay-rich facies, and spicule-rich facies. Current-induced features of these facies include mm- to cmscale cross- and parallel-laminations, scour surfaces, clastic/biogenic particle alignment, and normal- and inverse-size grading. A spectrum of vertical facies transitions and bed types indicate deposition from waxing-waning flows rather than from steady `rain' of particles to the sea floor. Detrital sponge spicule-rich facies suggests transport to the marine environment as hypopycnal or hyperpycnal flows and reversal in buoyancy by transformation from concentrated to dilute flows; alternatively the spicules could have originated by submarine slumping in front of contemporaneous shallow marine sponge reefs, and then transported basinward as turbidity current flows. The occurrence of dispersed biogenic/organic remains and inversely size graded mudstones also support a hyperpycnal and/or turbidity flow origin for a significant part of

  16. Literacy in isolation : an assessment of the literacy needs of oil and gas camp workers in the Fort St. John area : research report

    Energy Technology Data Exchange (ETDEWEB)

    Wiens, M.

    2000-07-01

    The oil and gas industry in British Columbia generates approximately $2 billion in economic activity annually. It employs about 39,000 British Columbians, mostly in the northeastern part of the province. In Fort St. John, 10 per cent of the workforce is in the oil and gas industry. This paper examined the literacy needs of oil and gas campworkers in work camps in the Fort St. John area. It presents recommendations on what types of programs could be implemented to meet literacy needs. Camp workers were interviewed and the information gathered formed the basis of the recommendations. The issues included motivation for working in camps, goals, and education. The study showed that 80 per cent of camp workers have a grade 12 education and 80 per cent have some technical training. Some clues to literacy problems that may be encountered in field camps include frequent errors on paperwork, high rate of work-related accidents, excessive waste, low productivity and too much supervisory time spent on basic activities. Some of the ideas that camp workers consider to be useful include spring break-up courses, computer stations, and book tables that provide access to literacy services.

  17. Astronauts Armstrong and Aldrin study rock samples during field trip

    Science.gov (United States)

    1969-01-01

    Astronaut Neil Armstrong, commander of the Apollo 11 lunar landing mission, and Astronaut Edwin Aldrin, Lunar module pilot for Apollo 11, study rock samples during a geological field trip to the Quitman Mountains area near the Fort Quitman ruins in far west Texas.

  18. Freight Advanced Traveler Information System (FRATIS) - Dallas-Fort Worth : as-built system architecture and design.

    Science.gov (United States)

    This document describes the As-Built System Architecture and Design for the FRATIS Dallas-Fort Worth : DFW prototype system. The FRATIS prototype in DFW consisted of the following components: : optimization algorithm, terminal wait time, route specif...

  19. Operations and Maintenance Manual for the Pilot-Scale Bioventing System at Building 8200, Fort Carson, Colorado

    National Research Council Canada - National Science Library

    1996-01-01

    This Operations and Maintenance (O&M) Manual has been created as a guide for monitoring and maintaining the performance of the pilot-scale bioventing blower system and vent well plumbing at Building 8200, Fort Carson, Colorado Bioventing...

  20. Operations and Maintenance Manual for the Expanded-Scale Bioventing System at Building 8200, Fort Carson, Colorado

    National Research Council Canada - National Science Library

    1997-01-01

    This operations and maintenance (O&M) manual has been created as a guide for monitoring and maintaining the performance of the expanded-scale bioventing blower system at Building 8200, Fort Carson, Colorado...

  1. 78 FR 33808 - Foreign-Trade Zone (FTZ) 39-Dallas-Fort Worth, Texas; Notification of Proposed Production...

    Science.gov (United States)

    2013-06-05

    ... Street, and 4600 Blue Mound Road, Fort Worth (Tarrant County), Texas. A separate application for ``usage... abroad include: plastic labels; parts of fans (housings, grills, pedestal assemblies, blades); electric...

  2. NRHP Evaluation of Ten Archaeological Sites and the Chapel of the Wings, US Army Aviation Center and Fort Rucker, Alabama

    National Research Council Canada - National Science Library

    Collins, Brian

    1998-01-01

    ...) and the Chapel of the Wings on the US Army Aviation Center and Fort Rucker, Alabama. Nine of these sites were discovered during site form exercises led by archaeologists frm Troy State University...

  3. 77 FR 57112 - Notice of Inventory Completion: U.S. Department of Defense, Army, Fort Sill Museum, Lawton, OK

    Science.gov (United States)

    2012-09-17

    ... representatives of Fort Sill. Following the excavation, Dr. Clyde Snow, Chief of the Physical Anthropology Section... to 25 U.S.C. 3001(9), the human remains described in this notice represent the physical remains of...

  4. An ecological response model for the Cache la Poudre River through Fort Collins

    Science.gov (United States)

    Shanahan, Jennifer; Baker, Daniel; Bledsoe, Brian P.; Poff, LeRoy; Merritt, David M.; Bestgen, Kevin R.; Auble, Gregor T.; Kondratieff, Boris C.; Stokes, John; Lorie, Mark; Sanderson, John

    2014-01-01

    The Poudre River Ecological Response Model (ERM) is a collaborative effort initiated by the City of Fort Collins and a team of nine river scientists to provide the City with a tool to improve its understanding of the past, present, and likely future conditions of the Cache la Poudre River ecosystem. The overall ecosystem condition is described through the measurement of key ecological indicators such as shape and character of the stream channel and banks, streamside plant communities and floodplain wetlands, aquatic vegetation and insects, and fishes, both coolwater trout and warmwater native species. The 13- mile-long study area of the Poudre River flows through Fort Collins, Colorado, and is located in an ecological transition zone between the upstream, cold-water, steep-gradient system in the Front Range of the Southern Rocky Mountains and the downstream, warm-water, low-gradient reach in the Colorado high plains.

  5. A non-conventional procedure for the 3D modeling of WWI forts

    Science.gov (United States)

    Nocerino, E.; Fiorillo, F.; Minto, S.; Menna, F.; Remondino, F.

    2014-06-01

    2014 is the hundredth anniversary of the outbreak of the First World War (WWI) - or Great War - in Europe and a number of initiatives have been planned to commemorate the tragic event. Until 1918, the Italian Trentino - Alto Adige region was under the Austro - Hungarian Empire and represented one of the most crucial and bloody war front between the Austrian and Italian territories. The region borders were constellated of military fortresses, theatre of battles between the two opposite troops. Unfortunately, most of these military buildings are now ruined and their architectures can be hardly appreciated. The paper presents the initial results of the VAST project (VAlorizzazione Storia e Territorio - Valorization of History and Landscape), that aims to digitally reconstruct the forts located on the plateaus of Luserna, Lavarone and Folgaria. An integrated methodology has been adopted to collect and employ all possible source of information in order to derive precise and photo-realistic 3D digital representations of WWI forts.

  6. Biomechanical testing of zirconium dioxide osteosynthesis system for Le Fort I advancement osteotomy fixation.

    Science.gov (United States)

    Hingsammer, Lukas; Grillenberger, Markus; Schagerl, Martin; Malek, Michael; Hunger, Stefan

    2018-01-01

    The following work is the first evaluating the applicability of 3D printed zirconium dioxide ceramic miniplates and screws to stabilize maxillary segments following a Le-Fort I advancement surgery. Conventionally used titanium and individual fabricated zirconium dioxide miniplates were biomechanically tested and compared under an occlusal load of 120N and 500N using 3D finite element analysis. The overall model consisted of 295,477 elements. Under an occlusal load of 500N a safety factor before plastic deformation respectively crack of 2.13 for zirconium dioxide and 4.51 for titanium miniplates has been calculated. From a biomechanical point of view 3D printed ZrO 2 mini-plates and screws are suggested to constitute an appropriate patient specific and metal-free solution for maxillary stabilization after Le Fort I osteotomy. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Cannon Fire Soon to Accompany Bugle Call at Fort Detrick | Poster

    Science.gov (United States)

    Beginning June 14, the familiar bugle calls at Fort Detrick will be joined by a special percussion instrument: a cannon. A single cannon shot will be fired on the first note of “Reveille,” which signals the start of each day and is accompanied by the raising of the American flag. “Reveille” sounds at 6:30 a.m. At 5 p.m., Fort Detrick plays “Retreat,” which alerts the post that the flag is about to be lowered. The cannon will fire on the last note of “Retreat.” After a five-second pause, “To the Color” plays as the flag is lowered.

  8. Edutainment, cultural innovation and social inclusion. Fort360, a project for cultural heritage enhancement

    Directory of Open Access Journals (Sweden)

    Paolo Di Pietro Martinelli

    2016-12-01

    Full Text Available   Fort360 project is a cultural initiative that receives the main directives of edutainment processes, trying to provide an answer to the necessity of a capillary system of information and awareness about the dismissing cultural heritage. The proposed study – carried out in the Fort Bravetta, Rome – presents a video where the educational aspect, related to the historical and architectural site contents, is strictly connected with the playful and emotional quality, resulted from a VR interaction with a panoramic video. This first case study focuses on the use of low-cost digital instrumentation and tries to improve the value of culture from the bottom, proposing an alternative way of cultural heritage enjoyment, based on participation and on interdisciplinarity of the proposed contents.

  9. Identification of Insect-Plant Pollination Networks for a Midwest Installation: Fort McCoy, WI

    Science.gov (United States)

    2016-04-01

    Pollinators and pollinator dependent plants are critical components of functioning ecosystems (Cane and Tepedino 2001). Nearly 88% of extant flowering plant ...is a pollinator species or is dependent on one. Currently, approximately 75% of 296 spe- cies at risk (SAR) flowering plants on installations are...of this study were to: (1) identify and compile infor- mation on pollinating insect fauna and pollinator dependent flowering plants for Fort McCoy

  10. Fort Lewis natural gas and fuel oil energy baseline and efficiency resource assessment

    International Nuclear Information System (INIS)

    Brodrick, J.R.; Daellenbach, K.K.; Parker, G.B.; Richman, E.E.; Secrest, T.J.; Shankle, S.A.

    1993-02-01

    The mission of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to lead the improvement of energy efficiency and fuel flexibility within the federal sector. Through the Pacific Northwest Laboratory (PNL), FEMP is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations; this procedure is entitled the Federal Energy Decision Screening (FEDS) system. Through a cooperative program between FEMP and the Army Forces Command (FORSCOM) for providing technical assistance to FORSCOM installations, PNL has been working with the Fort Lewis Army installation to develop the FEDS procedure. The natural gas and fuel oil assessment contained in this report was preceded with an assessment of electric energy usage that was used to implement a cofunded program between Fort Lewis and Tacoma Public Utilities to improve the efficiency of the Fort's electric-energy-using systems. This report extends the assessment procedure to the systems using natural gas and fuel oil to provide a baseline of consumption and an estimate of the energy-efficiency potential that exists for these two fuel types at Fort Lewis. The baseline is essential to segment the end uses that are targets for broad-based efficiency improvement programs. The estimated fossil-fuel efficiency resources are estimates of the available quantities of conservation for natural gas, fuel oils number-sign 2 and number-sign 6, and fuel-switching opportunities by level of cost-effectiveness. The intent of the baseline and efficiency resource estimates is to identify the major efficiency resource opportunities and not to identify all possible opportunities; however, areas of additional opportunity are noted to encourage further effort

  11. Inicial nasal mucosa detachment using piezoelectric device in the Le Fort I osteotomy: A technical note

    Directory of Open Access Journals (Sweden)

    Elio Hitoshi Shinohara

    2013-01-01

    Full Text Available In maxillary Le Fort I type osteotomy the detachment of the nasal mucosa should be done carefully. Piezoelectric surgery contributed much to increase the safety of osteotomies, despite the initial advantage of minimizing the risk of injury in nervous tissue, mainly in bilateral sagittal split osteotomy; we use the piezoelectric device for the initial detachment of the nasal mucosa in the maxillary osteotomy.

  12. Inicial nasal mucosa detachment using piezoelectric device in the Le Fort I osteotomy: A technical note

    Science.gov (United States)

    Shinohara, Elio Hitoshi; Kaba, Shajadi Carlos Pardo; Ruiz, Marcelo Martinson; Horikawa, Fernando Kendi

    2013-01-01

    In maxillary Le Fort I type osteotomy the detachment of the nasal mucosa should be done carefully. Piezoelectric surgery contributed much to increase the safety of osteotomies, despite the initial advantage of minimizing the risk of injury in nervous tissue, mainly in bilateral sagittal split osteotomy; we use the piezoelectric device for the initial detachment of the nasal mucosa in the maxillary osteotomy. PMID:23853472

  13. Energy efficiency campaign for residential housing at the Fort Lewis army installation

    Energy Technology Data Exchange (ETDEWEB)

    AH McMakin; RE Lundgren; EL Malone

    2000-02-23

    In FY1999, Pacific Northwest National Laboratory conducted an energy efficiency campaign for residential housing at the Fort Lewis Army Installation near Tacoma, Washington. Preliminary weather-corrected calculations show energy savings of 10{percent} from FY98 for energy use in family housing. This exceeded the project's goal of 3{percent}. The work was funded by the U.S. DOEs Federal Energy Management Program (FEMP), Office of Energy Efficiency and Renewable Energy. The project adapted FEMP's national ``You Have the Power Campaign'' at the local level, tailoring it to the military culture. The applied research project was designed to demonstrate the feasibility of tailored, research-based strategies to promote energy conservation in military family housing. In contrast to many energy efficiency efforts, the campaign focused entirely on actions residents could take in their own homes, as opposed to technology or housing upgrades. Behavioral change was targeted because residents do not pay their own utility bills; thus other motivations must drive personal energy conservation. This campaign augments ongoing energy savings from housing upgrades carried out by Fort Lewis. The campaign ran from September 1998 through August 1999. The campaign strategy was developed based on findings from previous research and on input from residents and officials at Fort Lewis. Energy use, corrected to account for weather differences, was compared with the previous year's use. Survey responses from 377 of Fort Lewis residents of occupied housing showed that the campaign was moderately effective in promoting behavior change. Of those who were aware of the campaign, almost all said they were now doing one or more energy-efficient things that they had not done before. Most people were motivated by the desire to do the right thing and to set a good example for their children. They were less motivated by other factors.

  14. Thermal stress analysis of a Fort St. Vrain core support block under accident conditions

    International Nuclear Information System (INIS)

    Carruthers, L.M.; Butler, T.A.; Anderson, C.A.

    1982-01-01

    A thermoelastic stress analysis of a graphite core support block in the Fort St. Vrain High Temperature Gas Cooled Reactor is described. The support block is subjected to thermal stresses caused by a loss of forced circulation accident of the reactor system. Two- and three-dimensional finite element models of the core suport block are analyzed using the ADINAT and ADINA codes, and results are given that verify the integrity of this structural component under the given accident condition

  15. Thermal-stress analysis of a Fort St. Vrain core-support block under accident conditions

    International Nuclear Information System (INIS)

    Carruthers, L.M.; Butler, T.A.; Anderson, C.A.

    1982-01-01

    A thermoelastic stress analysis of a graphite core support block in the Fort St. Vrain High Temperature Gas Cooled Reactor is described. The support block is subjected to thermal stresses caused by a loss of forced circulation accident of the reactor system. Two- and three-dimensional finite element models of the core support block are analyzed using the ADINAT and ADINA codes, and results are given that verify the integrity of this structural component under the given accident condition

  16. Procarti Forte in the Complex Treatment of Patients with Early-Stage Osteoarthritis

    Directory of Open Access Journals (Sweden)

    O.A. Burianov

    2016-04-01

    Full Text Available The article deals with the issue of the treatment of osteoarthritis. The review of current recommendations on the feasibility of using glucosamine sulfate, chondroitin sulfate, hyaluronic acid, using of SYSADOA drugs, metabolic drugs was performed. The study on the efficacy and safety of using combination drug Procarti Forte in the system of treatment of patients with early-stage osteoarthritis is presented.

  17. Chitosan Dilutable and Dilactin Forte: Assessment of Their Efficiency for Safety and Quality of Foodstuff

    Science.gov (United States)

    Iurchikova, N.; Khlebosolova, O.

    2018-01-01

    The modern natural food preservatives used to process and store foodstuff allow to ensure its safety and high quality. Chitosan and dilactin-forte are among such medicines. These preservatives are not only safe, but also are beneficial to a human body in virtue of their effects onto human digestive system. The article describes the results of the research conducted to identify the impact of these natural preservatives on safety of carrot (Daucus carota subsp. sativus)

  18. Sustainable Materials Replacement for Prevention of Corrosion at Fort Lewis, WA

    Science.gov (United States)

    2009-08-01

    high-efficiency ground-source heat pump and tankless water heaters . 2.4 Installation Because the subject technologies involved several major building...Lisa Cass, Landscape Architect o Jeanette M. Fiess, Electrical Engineer, Quality Assurance o George P. Henry, Supervisory Mechanical Engineer, Fort...overstressing connections or seams. The roof is a relatively steep pitch (6-1/2:12), designed to shed water as opposed to prevent it from penetrating

  19. Fort Lewis natural gas and fuel oil energy baseline and efficiency resource assessment

    Energy Technology Data Exchange (ETDEWEB)

    Brodrick, J.R. (USDOE, Washington, DC (United States)); Daellenbach, K.K.; Parker, G.B.; Richman, E.E.; Secrest, T.J.; Shankle, S.A. (Pacific Northwest Lab., Richland, WA (United States))

    1993-02-01

    The mission of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to lead the improvement of energy efficiency and fuel flexibility within the federal sector. Through the Pacific Northwest Laboratory (PNL), FEMP is developing a fuel-neutral approach for identifying, evaluating, and acquiring all cost-effective energy projects at federal installations; this procedure is entitled the Federal Energy Decision Screening (FEDS) system. Through a cooperative program between FEMP and the Army Forces Command (FORSCOM) for providing technical assistance to FORSCOM installations, PNL has been working with the Fort Lewis Army installation to develop the FEDS procedure. The natural gas and fuel oil assessment contained in this report was preceded with an assessment of electric energy usage that was used to implement a cofunded program between Fort Lewis and Tacoma Public Utilities to improve the efficiency of the Fort's electric-energy-using systems. This report extends the assessment procedure to the systems using natural gas and fuel oil to provide a baseline of consumption and an estimate of the energy-efficiency potential that exists for these two fuel types at Fort Lewis. The baseline is essential to segment the end uses that are targets for broad-based efficiency improvement programs. The estimated fossil-fuel efficiency resources are estimates of the available quantities of conservation for natural gas, fuel oils [number sign]2 and [number sign]6, and fuel-switching opportunities by level of cost-effectiveness. The intent of the baseline and efficiency resource estimates is to identify the major efficiency resource opportunities and not to identify all possible opportunities; however, areas of additional opportunity are noted to encourage further effort.

  20. Facing Stormwater Management Challenges at a Southeastern Army Installation: US Army Garrison Fort Gordon

    Science.gov (United States)

    2012-05-24

    the Solution to Stormwater Pollution at Fort Gordon ~trriGffiG 01 ~~~ • Oil , grease , heavy metals and toxic chemicals from motor vehicles...etc.) into the storm drains. Sinw stormwater drains are not oonnectacl to tl’e wastewater treatment system, the polluted stormwat:er Is trcn...examples of illicit discharge materials include paint, oil , antifreeze, yancl waste, etc. These pollutants degrade water qufllity anrl threaten

  1. Shallow structure and geomorphology, northern San Andreas fault, Bodega Bay to Fort Ross, California

    Science.gov (United States)

    Johnson, S. Y.; Hartwell, S. R.; Manson, M. W.

    2013-12-01

    We mapped a 35-km-long section of the northwest-trending San Andreas fault zone (SAFZ), extending through Bodega Bay, crossing the onshore Bodega Head isthmus, and continuing in the offshore to Fort Ross, California. Mapping is based on integrated analysis of high-resolution seismic-reflection profiles (38 fault crossings), multibeam bathymetry and backscatter data, onshore geology, seafloor-sediment samples, and digital camera and video imagery. In Bodega Bay, the SAFZ comprises multiple parallel to subparallel strands that extend through a 2-km-wide basin flanked by massive basement terranes, Cretaceous granitic rock on the southwest and Jurassic and Cretaceous Franciscan Complex on the northeast. Seismic profiles reveal the smooth basin seafloor is underlain by a thin (1 to 12 m) layer of latest Pleistocene and Holocene sediments and an underlying inferred Pleistocene unit characterized by faulted and folded reflections revealing numerous angular unconformities and channels. This geology suggests that Bodega Bay originated as a pull-apart basin formed by an eastern transfer of slip within the SAFZ. If so, the pervasive internal folding and faulting of the young basin fill suggests basin subsidence has largely ended and the basin fill is now being deformed. North of the Bodega Head isthmus, the SAFZ is relatively narrow (200 to 500 m wide) and cuts across relatively flat seafloor covered by sediments derived from the Russian River and Salmon Creek. Gentle fault bends and transfers of slip between subparallel strands have resulted in small fault-zone uplifts and four distinct, elongate (~ 500- to 2300-m long), narrow (~ 200- to 300-m wide) sag basins containing as much as 56 m of inferred latest Pleistocene to Holocene sediment. The offshore mapping suggests the presence of an important, previously unrecognized onshore SAFZ strand cutting across the Bodega Head isthmus about 800 m southwest of the only reported 1906 surface rupture in the map area. Onshore, this

  2. Digital Preservation of the Quon Sang Lung Laundry Building, Fort Macleod, Alberta

    Science.gov (United States)

    Dawson, P.; Baradaran, F.; Jahraus, A.; Rubalcava, E.; Farrokhi, A.; Robinson, C.

    2017-08-01

    This paper describes the results of an emergency recording and archiving of a historic structure in Southern Alberta and explores the lessons learned. Digital recording of the Quon Sang Lung Laundry building in Fort Macleod, Alberta, was a joint initiative between Alberta Culture and Tourism and the University of Calgary. The Quon Sang Lung Laundry was a boomtown-style wood structure situated in the Fort Macleod Provincial Historic Area, Alberta. Built in the mid-1800s, the structure was one of the four buildings comprising Fort Macleod's Chinatown. Its association with Chinese immigration, settlement, and emergence of Chinese-owned businesses in early twentieth-century Alberta, made the Quon Sang Lung Laundry a unique and very significant historic resource. In recent years, a condition assessment of the structure indicated that the building was not safe and that the extent of the instability could lead to a sudden collapse. In response, Alberta Culture and Tourism engaged the Departments of Anthropology and Archaeology and Geomatics Engineering from the University of Calgary, to digitally preserve the laundry building. A complete survey including the laser scanning of all the remaining elements of the original structure, was undertaken. Through digital modeling, the work guarantees that a three-dimensional representation of the building is available for future use. This includes accurate 3D renders of the exterior and interior spaces and a collection of architectural drawings comprising floor plans, sections, and elevations.

  3. Feltarbejde i Thule. Sammenfiltringen af steder, folk og fortællinger

    Directory of Open Access Journals (Sweden)

    Kirsten Hastrup

    2016-07-01

    Full Text Available På baggrund af lang tids arbejde i Thuleregionen i det nordvestligste Grønland vil jeg diskutere, hvordan steder, folk og fortællinger gensidigt former hinanden. ’Felten’ er således formateret af mange forhold, historiske og nutidige, naturlige og kulturelle, og man må besinde sig på feltens flydende form, selv når den ser mest solid ud. Steder er i sig selv flygtige; de opstår i mødet med mennesker, som tillægger dem betydning. Folk kan se nok så traditionelle ud, men de lever i samme verden som antropologen, der kommer for at lære af dem. Endelig er fortællingerne ikke stivnede vidnesbyrd om tidligere tider; de er tværtimod et vigtigt redskab i håndteringen af højst nutidige udfordringer, som kommer til syne i det endnu ufortalte. Bag fortællingen om Thule ligger en større diskussion af enhver felts plasticitet.

  4. How confident is Fort McKay that industry can reclaim oil sand development

    International Nuclear Information System (INIS)

    Fitzpatrick, C.

    2004-01-01

    This presentation described how traditional environmental knowledge (TEK) can provide valuable information for both the reclamation design and assessment of oil sand development in Fort McKay. Conservation is valued by the Fort McKay First Nations communities who claim that current reclamation methods are too slow, and that the land is not being brought back to its original use with the uniqueness of the boreal landscape. Elders have noted that each year the water level in the Athabasca River is lower. The blowing tailings and coke dust are causing trees to dye and driving animals away. There is concern that the animals that remain may not be safe to eat. The Fort McKay First Nation community has stated that it will view reclamation as a success only when it functions with proof over many generations. The major concerns include: salt in the water draining from reclaimed areas; salt in the soils of reclaimed area; muskeg cannot be recreated; and, the issue of whether cranberry, blueberry and streambank forest areas can be recreated, along with traditional medicinal plants. Other concerns include the loss of rivers such as the Beaver Creek and Tar River, and that the water in reclaimed areas may not be suitable for animals to live in or to drink. tabs., figs

  5. The Fort McMurray Demonstration Project in Social Marketing: theory, design, and evaluation.

    Science.gov (United States)

    Guidotti, T L; Ford, L; Wheeler, M

    2000-02-01

    The Fort McMurray Demonstration Project in Social Marketing is a multifaceted program that applies the techniques of social marketing to health and safety. This paper describes the origins of the project and the principles on which it was based. VENUE: Fort McMurray, in the province of Alberta, Canada, was selected because the community had several community initiatives already underway and the project had the opportunity to demonstrate "value added." The project is distinguished from others by a model that attempts to achieve mutually reinforcing effects from social marketing in the community as a whole and from workplace safety promotion in particular. Specific interventions sponsored by the project include a media campaign on cable television, public activities in local schools, a community safety audit, and media appearance by a mascot that provides visual identity to the project, a dinosaur named "Safetysaurus." The project integrated its activities with other community initiatives. The evaluation component emphasizes outcome measures. A final evaluation based on injury rates and attitudinal surveys is underway. Baseline data from the first round of surveys have been compiled and published. In 1995, Fort McMurray became the first city in North America to be given membership in the World Health Organization's Safe Community Network.

  6. How confident is Fort McKay that industry can reclaim oil sand development

    Energy Technology Data Exchange (ETDEWEB)

    Fitzpatrick, C. [Fort McKay First Nations, AB (Canada)

    2004-02-05

    This presentation described how traditional environmental knowledge (TEK) can provide valuable information for both the reclamation design and assessment of oil sand development in Fort McKay. Conservation is valued by the Fort McKay First Nations communities who claim that current reclamation methods are too slow, and that the land is not being brought back to its original use with the uniqueness of the boreal landscape. Elders have noted that each year the water level in the Athabasca River is lower. The blowing tailings and coke dust are causing trees to dye and driving animals away. There is concern that the animals that remain may not be safe to eat. The Fort McKay First Nation community has stated that it will view reclamation as a success only when it functions with proof over many generations. The major concerns include: salt in the water draining from reclaimed areas; salt in the soils of reclaimed area; muskeg cannot be recreated; and, the issue of whether cranberry, blueberry and streambank forest areas can be recreated, along with traditional medicinal plants. Other concerns include the loss of rivers such as the Beaver Creek and Tar River, and that the water in reclaimed areas may not be suitable for animals to live in or to drink. tabs., figs.

  7. Fort Collins Science Center- Policy Analysis and Science Assistance Branch : Integrating social, behavioral, economic and biological sciences

    Science.gov (United States)

    2010-01-01

    The Fort Collins Science Center's Policy Analysis and Science Assistance (PASA) Branch is a team of approximately 22 scientists, technicians, and graduate student researchers. PASA provides unique capabilities in the U.S. Geological Survey by leading projects that integrate social, behavioral, economic, and biological analyses in the context of human-natural resource interactions. Resource planners, managers, and policymakers in the U.S. Departments of the Interior (DOI) and Agriculture (USDA), State and local agencies, as well as international agencies use information from PASA studies to make informed natural resource management and policy decisions. PASA scientists' primary functions are to conduct both theoretical and applied social science research, provide technical assistance, and offer training to advance performance in policy relevant research areas. Management and research issues associated with human-resource interactions typically occur in a unique context, involve difficult to access populations, require knowledge of both natural/biological science in addition to social science, and require the skill to integrate multiple science disciplines. In response to these difficult contexts, PASA researchers apply traditional and state-of-the-art social science methods drawing from the fields of sociology, demography, economics, political science, communications, social-psychology, and applied industrial organization psychology. Social science methods work in concert with our rangeland/agricultural management, wildlife, ecology, and biology capabilities. The goal of PASA's research is to enhance natural resource management, agency functions, policies, and decision-making. Our research is organized into four broad areas of study.

  8. Environmental flow studies of the Fort Collins Science Center, U.S. Geological Survey-Cherry Creek, Arizona

    Science.gov (United States)

    Waddle, Terry J.; Bovee, Ken D.

    2010-01-01

    At the request of the U.S. Forest Service, an instream flow assessment was conducted at Cherry Creek, Ariz., to investigate habitat for native and introduced fish species and to describe the beneficial use of a possible instream flow water right. The U.S. Geological Survey (USGS) Fort Collins Science Center performed an intensive field study of two sections of Cherry Creek in September 2008 to provide base data for hydrodynamic simulation of the flow conditions in the stream. The USGS Arizona Cooperative Fish and Wildlife Research Unit, at the University of Arizona School of Natural Resources, conducted a survey of the habitat requirements of the resident fish species in Cherry Creek and provided the habitat suitability criteria used in this study. The habitat suitability criteria were combined with hydrodynamic simulation results to quantify fish habitat for the full range of daily flow experienced in the creek and to produce maps of habitat occurrence for those flows. The flow record at the Cherry Creek stream gage was used to generate habitat response values over time. The long-term habitat response was incorporated into an Excel (Registered) spreadsheet to allow evaluation of habitat occurrence with and without an instream water right under different hypothetical water withdrawal scenarios. The spreadsheet displays information about the time sequence of habitat events, the duration of critical events, and habitat retention.

  9. Impacts of Mackenzie gas project on water supply systems of northern communities : Fort Simpson as a case study

    International Nuclear Information System (INIS)

    Mathrani, M.; Johnson, K.

    2007-01-01

    The proposed Mackenzie Gas Project (MGP) is a 1220-kilometre natural gas pipeline system along the Mackenzie Valley of Canada's Northwest Territories. The line will connect northern onshore gas fields with North American markets. Four major Canadian oil and gas companies and a group representing the Aboriginal peoples of Canada's Northwest Territories are partners in the proposed MGP. The MGP is currently in the project definition stage that involves examining the effect of the project on northern communities. Fort Simpson is located on an island, on the forks of the Mackenzie and Liard Rivers and is proposed as the major route for the MGP with the construction of barge handling areas, storage areas, camps/housing units and use of air and highway facilities. These activities are expected to result in burden on local civil infrastructure systems including water supply systems. Although the environmental impacts of the project on the community's infrastructure systems are projected by the MGP proponents, the local authority wanted to conduct its own assessment of the impacts on local water supply system. This paper presented the results of a study that examined the amount of water used by the community based upon available water use records and the current operational and maintenance costs based upon available financial documents. The study also estimated future water requirements based upon MGP activities and associated population growth. Current and future economic rates were also determined. 13 refs., 6 tabs

  10. In Situ Redox Manipulation Proof-of-Principle Test at the Fort Lewis Logistics Center: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    VR Vermeul; MD Williams; JC Evans; JE Szecsody; BN Bjornstad; TL Liikala

    2000-10-25

    Pacific Northwest National Laboratory (PNNL) conducted a proof-of-principle test at the Fort Lewis Logistics Center to determine the feasibility of using the In Situ Redox Manipulation (ISRM) technology for remediating groundwater contaminated with dissolved trichloroethylene (TCE). ISRM creates a permeable treatment zone in the subsurface to remediate redox-sensitive contaminants in groundwater. The permeable treatment zone is formed by injecting a chemical reducing agent (sodium dithionite with pH buffers) into the aquifer through a well to reduce the naturally occurring ferric iron in the sediments to ferrous iron. Once the reducing agent is injected and given sufficient time to react with aquifer sediments, residual chemicals and reaction products are withdrawn from the aquifer through the same well used for the injection. Redox-sensitive contaminants such as TCE, moving through the treatment zone under natural groundwater flow conditions, are destroyed. TCE is degraded via reductive dechlorination within the ISRM treatment zone to benign degradation products (i.e., acetylene, ethylene). Prior to the proof-of-principle field test, the ISRM technology was successfully demonstrated in laboratory experiments for the reductive dechlorination of dissolved TCE using sediments from the Fort Lewis site. The Logistics Center was placed on the National Priorities List in December 1989 because of TCE contamination in groundwater beneath the site. A Federal Facilities Agreement between the Army, the U.S. Environmental Protection Agency, and the Washington State Department of Ecology became effective in January 1990, and a Record of Decision (ROD) was signed in September 1990. The major components of the ROD included installation of two pump-and-treat systems for the upper aquifer and further investigation of the lower aquifer and other potential sources of contamination. The pump-and-treat systems became operational in August 1995. Fort Lewis asked PNNL to provide

  11. Anterior open bite correction by Le Fort I osteotomy with or without anterior segmentation: which is more stable?

    Science.gov (United States)

    Ismail, I N; Leung, Y Y

    2017-06-01

    A retrospective cohort study was conducted to analyze the relapse rate of anterior open bite (AOB) correction comparing Le Fort I osteotomy with and without anterior segmentation. The risk factors that might contribute to relapse were also assessed. Lateral cephalograms obtained at six different times were analyzed. A total of 81 patients with AOB were recruited. Thirty-five patients underwent Le Fort I osteotomy without anterior segmentation and 46 patients underwent anterior segmentation. Le Fort I osteotomy with anterior segmentation resulted in significantly more AOB relapse when compared to that without anterior segmentation at 7 weeks postoperative (15.2% vs. 0%, P=0.016). During the early postoperative period, factors that contributed to AOB relapse in Le Fort I osteotomy with anterior segmentation were AOB closure ≥4mm and inferior positioning of the anterior segment >2mm. Over the long term, AOB closure ≥4mm and intraoral vertical ramus osteotomy as the only mandibular procedure were factors identified as causing more AOB relapse in those treated by Le Fort I osteotomy with anterior segmentation. In conclusion, Le Fort I osteotomy without anterior segmentation was found to be more stable in the surgical correction of AOB in the early and late postoperative periods. Copyright © 2017 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

  12. Water Quality Conditions Monitored at the Corps’ Fort Peck Project in Montana during the 3-Year Period 2004 through 2006

    Science.gov (United States)

    2007-03-01

    community of Fort Peck Reservoir, and only minor “blooms” of cyanobacteria were observed. The water discharged through Fort Peck Dam exhibited good...slightly less in drought years. Channel capacity below Fort Peck Dam is approximately 35,000 cfs. Daily winter releases are generally 10,000 to...phosphorus. Other important constituents are silica, manganese, iron, and sulfur . Dissolved oxygen: Oxygen is a fundamental chemical constituent

  13. Methodology to Assess Field of View of Maxillofacial Protective Devices

    Science.gov (United States)

    2012-11-01

    USAARL Report No. 2013-05 Methodology to Assess Field of View of Maxillofacial Protective Devices By Jose E. Cap6-Aponte William McLean Josue...13-11-2012 Final Methodology to Assess Field of View of Maxillofacial Protective Devices Jose E. Capo-Aponte William McLean Josue Sosa Steve Martin...Scott Street Fort Detrick, MD 21702 USAMRMC Approved for public release; distribution unlimited. The frequency of maxillofacial battlefield injuries

  14. The hill forts and castle mounds in Lithuania: interaction between geodiversity and human-shaped landscape

    Science.gov (United States)

    Skridlaite, Grazina; Guobyte, Rimante; Satkunas, Jonas

    2015-04-01

    Lithuania is famous for its abundant, picturesque hill forts and castle mounds of natural origin. In Lithuania as well as in whole Europe the fortified hills were used as the society dwelling place since the beginning of the Late Bronze Age. Their importance increased when Livonian and Teutonic Orders directed a series of military campaigns against Lithuania with the aim of expansion of Christianity in the region at the end of 1st millennium AD, and they were intensively used till the beginning of the 15th c. when most of them were burned down during fights with the Orders or just abandoned due to the changing political and economical situation. What types of the geodiversity were used for fortified dwellings? The choice in a particular area depended on a variety of geomorphology left behind the retreating ice sheets. High spots dominating their surroundings were of prime interest. In E and SE Lithuania, the Baltic Upland hills marking the eastern margin of the last Weichselian glacier hosted numerous fortified settlements from the end of 2nd millennium BC to the Medieval Ages (Narkunai, Velikuskes etc). In W Lithuania, plateau-like hills of the insular Samogitian Upland had been repeatedly fortified from the beginning of 1st millennium AD to the 14th century (Satrija, Medvegalis etc). Chains of hill forts and castle mounds feature the slopes of glaciofluvial valleys of Nemunas, Neris and other rivers where the slopes were dissected by affluent rivulets and ravines and transformed into isolated, well protected hills (Kernave, Punia, Veliuona etc). Peninsulas and headlands formed by the erosion of fluvial and lacustrine deposits were used in the lowlands, e.g. in central and N Lithuania (Paberze, Mezotne etc). How much the landscape was modified for defense purposes? Long-term erosion and overgrowing vegetation damaged the former fortified sites, however some remains and the archeological excavations allowed their reconstruction. The fortified Bronze Age settlements

  15. ASSESSMENT OF HYDROCARBON SEEPAGE DETECTION METHODS ON THE FORT PECK RESERVATION, NORTHEAST MONTANA

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence M. Monson

    2003-06-30

    Surface exploration techniques have been employed in separate study areas on the Fort Peck Reservation in northeastern Montana. Anomalies associated with hydrocarbon seepage are documented in all three areas and a variety of surface exploration techniques can be compared. In a small area with established production, Head Gas and Thermal Desorption methods best match production; other methods also map depletion. In a moderate-size area that has prospects defined by 3D seismic data, Head Gas along with Microbial, Iodine, and Eh soil anomalies are all associated with the best hydrocarbon prospect. In a large area that contains many curvilinear patterns observed on Landsat images, that could represent micro-seepage chimneys, results are inconclusive. Reconnaissance mapping using Magnetic Susceptibility has identified a potential prospect; subsequent Soil Gas and Head Gas surveys suggest hydrocarbon potential. In the final year of this project the principle contractor, the Fort Peck Tribes, completed a second survey in the Wicape 3D Seismic Prospect Area (also known as Area 6 in Phase I of the project) and sampled several Landsat image features contained in the Smoke Creek Aeromag Anomaly Area (also known as Area 1 in Phase II of the project). Methods determined to be most useful in Phases I and II, were employed in this final Phase III of the study. The Southwest Wicape seismic anomaly was only partially confirmed. The abundant curvilinears proposed to be possible hydrocarbon micro-seepage chimneys in the Smoke Creek Area were not conclusively verified as such. Insufficient sampling of background data precludes affirmative identification of these mostly topographic Landsat features as gas induced soil and vegetation anomalies. However relatively higher light gas concentrations were found associated with some of the curvilinears. Based on the findings of this work the Assiniboine & Sioux Tribes of the Fort Peck Reservation intend to utilize surface hydrocarbon

  16. Cultural keystone species in oil sands mine reclamation, Fort McKay, Alberta, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Garibaldi, A.; Straker, J. [Stantec Ltd., Sidney, BC (Canada)

    2009-07-01

    Cultural keystone species (CKS) shape the cultural identify of people through the roles they have in diet, material and spiritual practices. The use of the CKS concept is regarded as a method of addressing linked social and ecological issues. This paper presented the results of using the CKS model in the indigenous community of Fort McKay, Alberta to address, social, ecological and spiritual values in regional mine-land reclamation. Fort McKay is at the epicenter of the existing mine developments. Its residents regard human and environmental health to be be linked and therefore experience the effects of development and subsequent reclamation on both cultural and ecological levels. The community is actively engaged in working with the local mining companies on issues of mine reclamation design. In order to hold meaning to the local people, oil sand operators used the CKS concept in their reclamation efforts to take into account ecological functionality and also address the linked social factors. Five CKS were identified through a literature review and extensive community interviews. The list includes moose, cranberry, blueberry, ratroot and beaver. These 5 CKS were used to focus discussions and make recommendations for relevant land reclamation within Fort McKay traditional territory. The project has influenced the way both the community and oil sands operators engage with reclamation. Lessons learned from this process will help direct reclamation activities on other portions of traditional territory, while offering guidance to other regional developers for addressing cultural values in reclamation on their leases. 15 refs., 1 fig.

  17. Hydrogeochemical cycling and chemical denudation in the Fort River Watershed, central Massachusetts: An appraisal of mass-balance studies

    Science.gov (United States)

    Yuretich, Richard F.; Batchelder, Gail L.

    1988-01-01

    The Fort River watershed in central Massachusetts receives precipitation with a composition similar to that in Hubbard Brook (New Hampshire), yet the average stream water chemistry is substantially different, showing higher pH and TDS. This is largely a function of bedrock and surficial geology, and chemical differences among small streams within the Fort River watershed are apparently controlled by the composition and thickness of the prevailing surficial cover. The surficial deposits determine groundwater and surface water flow paths, thereby affecting the resultant contact time with mineral matter and the chemistry of the runoff. Despite the rural setting, over 95% of the annual sodium and chloride in the streams comes from road salt; after correcting for this factor, cation denudation rates are about equal to those at Hubbard Brook. However, silica removal is occurring at a rate more than 30% greater in the Fort River. When climatic conditions in Hubbard Brook and Fort River are normalized, weathering rates appear consistently higher in the Fort River, reflecting differences in weathering processes (i.e., cation exchange and silicate breakdown) and hydrogeology. Because of uncertainties in mechanisms of cation removal from watersheds, the silica denudation rate may be a better index of weathering intensity.

  18. The Role of Occupant Behavior in Achieving Net Zero Energy: A Demonstration Project at Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Judd, Kathleen S.; Sanquist, Thomas F.; Zalesny, Mary D.; Fernandez, Nicholas

    2013-09-30

    This study, sponsored by the U.S. General Services Administration’s Office of Federal High-Performance Green Buildings, aimed to understand the potential for institutional and behavioral change to enhance the performance of buildings, through a demonstration project with the Department of Defense in five green buildings on the Fort Carson, Colorado, Army base. To approach this study, the research team identified specific occupant behaviors that had the potential to save energy in each building, defined strategies that might effectively support behavior change, and implemented a coordinated set of actions during a three-month intervention.

  19. Wind Monitoring Report for Fort Wainwright's Donnelly Training Area

    Energy Technology Data Exchange (ETDEWEB)

    Orrell, Alice C.; Dixon, Douglas R.

    2011-01-18

    Using the wind data collected at a location in Fort Wainwright’s Donnelly Training Area (DTA) near the Cold Regions Test Center (CRTC) test track, Pacific Northwest National Laboratory (PNNL) estimated the gross and net energy productions that proposed turbine models would have produced exposed to the wind resource measured at the meteorological tower (met tower) location during the year of measurement. Calculations are based on the proposed turbine models’ standard atmospheric conditions power curves, the annual average wind speeds, wind shear estimates, and standard industry assumptions.

  20. RCRA Facility Investigation Report Texas Solid Waste Management Units Fort Bliss El Paso, Texas. Volume 1

    Science.gov (United States)

    1991-12-01

    New Mexico line, and east to southeast from the Sierra de I Juarez. The general direction of water movement was toward the valley of the Rio Grande...Range Wel 2 4 - - - Bldg. 8101; Dona Ana Target Range Well 3 5 - - - Humo Firing Point Wll 3 I6 886 1141 256 Bldg. 1170; Fort Bliss Well 5 I 7 984 1092...SWMU. This monitoring was performed by the SSO using a Foxboro Model 128 flame ionization detector (FID) organic vapor analyzer (OVA), or an HNU Model

  1. Guide to General Atomic studies of hypothetical nuclear driven accidents for the Fort St. Vrain reactor

    International Nuclear Information System (INIS)

    Wei, T.; Tobias, M.

    1974-03-01

    The work of the General Atomic Company (GAC) in preparing those portions of the Final Safety Analysis Report for the Fort St. Vrain Reactor (FSV) having to do with hypothetical nuclear driven accidents has been reviewed and a guide to this literature has been prepared. The sources for this study are the Final Safety Analysis Report itself, the Quarterly and Monthly Progress Reports, Topical Reports, and Technical Specifications. The problems considered and the methods used are outlined. An appendix gives a systematic analysis which was used as a guide in organizing the references. (U.S.)

  2. Three-dimensional thermoelastic analysis of a Fort St. Vrain core support block

    Energy Technology Data Exchange (ETDEWEB)

    Butler, T.A.; Anderson, C.A.

    1981-09-01

    A thermoelastic stress analysis of a graphite core support block in the Fort St. Vrain High-Temperature Gas-Cooled Reactor is described. The support block is subjected to thermal stresses caused by a loss of forced circulation accident of the reactor system. Two- and three-dimensional finite element models of the core support block are analyzed using the ADINAT and ADINA codes, and results are given that verify the integrity of this structural component under the given accident condition. 10 refs., 39 figs.

  3. Irrigation water use for the Fort Lyon Canal, southeastern Colorado, 1989-90

    Science.gov (United States)

    Dash, R.G.

    1995-01-01

    The U.S. Geological Survey, in cooperation with the Bent County Board of County Commissioners, began a study to evaluate irrigation water use quanti- tatively for about 91,630 acres of farmland irrigated from the 103.7-mile-long Fort Lyon Main Canal in the Arkansas River Valley of southeastern Colorado. This report provides information from 1980 and 1990 for four hydrologic components of irrigation water use: Surface-water withdrawals, conveyance losses, ground-water withdrawals, and estimates of threretical crop consumptive use. Surface-water withdrawals for the Fort Lyon Canal were 211,150 acre-feet (about 2.3 acre-feet per acre) during 1989 and 202,000 acre-feet (about 2.2 acre-feet per acre) during 1990. Conveyance losses occurred during the transport of water in the unlined Fort Lyon Canal. Conveyance losses were as much as 72 (acre-feet per day) per mile in the first division of the canal and generally decreased in the downstream canal divisions. Ground-water withdrawals for the Fort Lyon Canal were estimated to be 38,890 acre-feet (about 0.8 acre-foot per acre irrigated ground water) during 1989 and 33,970 acre-feet (about 0.7 acre-foot per acre irrigated by ground water) during 1990. Theoretical crop consumptive use was estimated to be 227,530 acre-feet (about 2.7 acre-feet per acre of cropland) during 1989 and 251, 130 acre-feet (about 2.9 acre-feet per acre of cropland) during 1990. The total crop irrigation requirement needed from irrigation withdrawals was 172,100 acre-feet (about 2.0 acre-feet per acre of cropland) during ` 1989 and 190,050 acre-feet (about 2.2 acre-feet per acre of cropland) during 1990. Crops cultivted in the five divisions of the canal were alfalfa, sorghum, corn, wheat, pasture, and spring grains.

  4. Revised Geologic Map of the Fort Garland Quadrangle, Costilla County, Colorado

    Science.gov (United States)

    Wallace, Alan R.; Machette, Michael N.

    2008-01-01

    The map area includes Fort Garland, Colo., and the surrounding area, which is primarily rural. Fort Garland was established in 1858 to protect settlers in the San Luis Valley, then part of the Territory of New Mexico. East of the town are the Garland mesas (basalt-covered tablelands), which are uplifted as horsts with the Central Sangre de Cristo fault zone. The map also includes the northern part of the Culebra graben, a deep structural basin that extends from south of San Luis (as the Sanchez graben) to near Blanca, about 8 km west of Fort Garland. The oldest rocks exposed in the map area are early Proterozic basement rocks (granites in Ikes Creek block) that occupy an intermediate structural position between the strongly uplifted Blanca Peak block and the Culebra graben. The basement rocks are overlain by Oligocene volcanic and volcaniclastic rocks of unknown origin. The volcanic rocks were buried by a thick sequence of basin-fill deposits of the Santa Fe Group as the Rio Grande rift formed about 25 million years ago. The Servilleta Basalt, a regional series of 3.7?4.8 Ma old flood basalts, was deposited within sediment, and locally provides a basis for dividing the group into upper and lower parts. Landslide deposits and colluvium that rest on sediments of the Santa Fe Group cover the steep margins of the mesas. Exposures of the sediment beneath the basalt and within the low foothills east of the Central Sangre de Cristo fault zone are comprised of siltstones, sandstones, and minor fluvial conglomerates. Most of the low ground surrounding the mesas and in the graben is covered by surficial deposits of Quaternary age. The alluvial deposits are subdivided into three Pleistocene-age units and three Holocene-age units. The oldest Pleistocene gravel (unit Qao) is preserved as isolated remnants that cap high surfaces north and east of Fort Garland. The primary geologic hazards in the map area are from earthquakes, landslides, and localized flooding. The Central

  5. Report to the Fort Belknap Community Council on the work undertaken during the summer, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Wehrenberg, J.P.; Ballard, J.H.; Pfouts, R.P.

    1979-01-01

    Results are presented of a gravity survey undertaken to determine the potential for oil and gas extraction on the Fort Belknap Indian Reservation. Two hundred forty-eight gravity measurements were taken and at least one major anomaly was found. Analysis of available surface and subsurface information suggests that there is a limited potential for oil but a somewhat better potential for the development of gas. Commercial development of coal is not likely, but there is at least one small coalfield that may be exploited for local use. Bentonite presents the best option for commercial development.

  6. Community Environmental Response Facilitation ACT (CERFA) Report, Fort Benjamin Harrison, Indiana

    Science.gov (United States)

    1994-04-01

    to,. 0 bo -A A A ,o- EaU -C) .~ ~ ~ < -1 C14 C,4 N 2< 141 : -az ba’ X 0 -, cr -z ’ ’u Lr !. Cc.0S = .: LVcc r= aeqcau. o~ > U < UM- UM UMU wM ME aQ0...Fort Benjamin Harrison, Indiana. April 15-18, 1986. U.S. Army Environmental Hygiene Agency (USAEHA). 1981a. Potable /Recreational Water Quality...validated data for various surface water, groundwater, and potable water samples. Based on a cursory review of this data, the CERFA contractor

  7. Geothermal Direct Use Feasibility Study on the Fort Bidwell Indian Reservation

    Energy Technology Data Exchange (ETDEWEB)

    Dale Merrick

    2007-04-20

    The Fort Bidwell Indian Reservation (FBIR) is rich in renewable energy resources. Development of its geothermal resources has the potential to profoundly affect the energy and economic future of the FBIC. Geothermal energy can contribute to making the reservation energy self-sufficient and, potentially, an energy exporter. The feasibility study assessed the feasibility of installing a geothermal district heating system to provide low-cost, efficient heating of existing and planned residences, community buildings and water, using an existing geothermal well, FB-3.

  8. Hydrologic data for urban stormwater studies in the Dallas-Fort Worth area, Texas, 1992-94

    Science.gov (United States)

    Baldys, Stanley; Raines, T.H.; Mansfield, B.L.; Sandlin, J.T.

    1997-01-01

    This report presents precipitation and waterquality data from analyses of 210 samples collected at 30 storm-sewer outfall stations in the Dallas-Fort Worth area, Texas, during February 1992-November 1994. The data were collected to fulfill requirements mandated by the U.S. Environmental Protection Agency to the cities of Arlington, Dallas, Fort Worth, Garland, Irving, Mesquite, and Piano and to the Dallas and Fort Worth Districts of the Texas Department of Transportation to obtain a National Pollution Discharge Elimination System permit. Data were collected at storm-sewer outfall stations in drainage basins classified as singular land use, either residential, commercial, industrial, or highway. Also included are qualityassurance/quality-control data for samples collected in conjunction with the stormwater samples.

  9. Fort Collins Science Center Ecosystem Dynamics branch--interdisciplinary research for addressing complex natural resource issues across landscapes and time

    Science.gov (United States)

    Bowen, Zachary H.; Melcher, Cynthia P.; Wilson, Juliette T.

    2013-01-01

    The Ecosystem Dynamics Branch of the Fort Collins Science Center offers an interdisciplinary team of talented and creative scientists with expertise in biology, botany, ecology, geology, biogeochemistry, physical sciences, geographic information systems, and remote-sensing, for tackling complex questions about natural resources. As demand for natural resources increases, the issues facing natural resource managers, planners, policy makers, industry, and private landowners are increasing in spatial and temporal scope, often involving entire regions, multiple jurisdictions, and long timeframes. Needs for addressing these issues include (1) a better understanding of biotic and abiotic ecosystem components and their complex interactions; (2) the ability to easily monitor, assess, and visualize the spatially complex movements of animals, plants, water, and elements across highly variable landscapes; and (3) the techniques for accurately predicting both immediate and long-term responses of system components to natural and human-caused change. The overall objectives of our research are to provide the knowledge, tools, and techniques needed by the U.S. Department of the Interior, state agencies, and other stakeholders in their endeavors to meet the demand for natural resources while conserving biodiversity and ecosystem services. Ecosystem Dynamics scientists use field and laboratory research, data assimilation, and ecological modeling to understand ecosystem patterns, trends, and mechanistic processes. This information is used to predict the outcomes of changes imposed on species, habitats, landscapes, and climate across spatiotemporal scales. The products we develop include conceptual models to illustrate system structure and processes; regional baseline and integrated assessments; predictive spatial and mathematical models; literature syntheses; and frameworks or protocols for improved ecosystem monitoring, adaptive management, and program evaluation. The descriptions

  10. Chemical, biomedical and ecological studies of SRC-I materials from the Fort Lewis Pilot Plant: a status report

    Energy Technology Data Exchange (ETDEWEB)

    Mahlum, D.D. (ed.)

    1981-01-01

    This document discusses studies performed with solvent refined coal (SRC) materials obtained from the Fort Lewis Pilot Plant during operation in the SRC-I mode. The development of analytical methodology is presented as well as results obtained from the application of these methods to light oil (LO), wash solvent (WS) and process solvent (PS). Results of cellular and animal studies with LO, WS and PS are included, along with a description of methods for the generation and characterization of LO and PS aerosols, and for exposing rats, mice and guinea pigs to these aerosols. The effects of SRC-I product on seed germination and plant growth which have also been studied are discussed. The SRC-I product, feed coal and the mineral residue have been analyzed for organic and inorganic constituents. The higher-boiling-point material, PS, exhibited significant mutagenic activity in the Ames assay; LO and WS were inactive. Process solvent also caused transformation of cultured Syrian hamster embryo cells. Additional chemical fractionation studies suggest that primary aromatic amines are major determinants of the observed mutagenic activity. Skin-painting studies with SRC-II naphtha, heavy distillate, shale oil and petroleum crude indicate a good correlation between the results of the cellular assays and skin carcinogenesis in mice. Wash solvent was more toxic after oral administration to rats than was light oil or process solvent. The effects of LO, WS and PS on development were studied after administration to pregnant rats. The tissue distribution of a number of components of PS was studied after oral administration of PS to rats. The effect of SRC-I product on the germination and growth of barley was investigated by mixing or layering the product with soil and placing the mixture in a field lysimeter.

  11. "Fort Valley State University Cooperative Developmental Energy Program: Broadening the Participation of Underrepresented Minorities in the Geosciences"

    Science.gov (United States)

    Crumbly, I.; Hodges, J.; Kar, A.; Rashidi, L.

    2015-12-01

    According to the American Geological Institute's Status of Recent Geoscience Graduates, 2014, underrepresented minorities (URMs) make up only 7%, 5%, and 2% of graduates at the BS/BA, MA/MS, and Ph.D levels, respectively. Recruiting academically-talented URMs to major in the geosciences instead of majoring in other fields such as medicine, law, business, or engineering is a major undertaking. Numerous factors may contribute as to why few URMs choose geoscience careers. To address the underrepresentation of URMs in the geosciences 1992, the Cooperative Developmental Energy Program (CDEP) of Fort Valley State University (FVSU) and the College of Geosciences at the University of Oklahoma (OU) implemented a 3 + 2 dual degree program specifically in geology and geophysics. Since 1992, FVSU-CDEP has added the University of Texas at Austin (2004), Pennsylvania State University (2005), University of Arkansas (2010), and the University of Nevada at Las Vegas (2015) as partners to offer degrees in geology and geophysics. The dual degree programs consist of students majoring in chemistry or mathematics at FVSU for the first three years and transferring to one of the above partnering universities for years four and five to major in geology or geophysics. Upon completion of the program, students receive a BS degree in chemistry or mathematics from FVSU and a BS degree in geology or geophysics from a partnering university. CDEP has been responsible for recruiting 33 URMs who have earned BS degrees in geology or geophysics. Females constitute 50% of the graduates which is higher than the national average. Also, 56% of these graduates have earned the MS degree and 6% have earned the Ph.D. Currently, 60% of these graduates are employed with oil and gas companies; 20% work for academia; 12% work for governmental agencies; 6 % are professionals with environmental firms; and 2% of the graduate's employment is unknown.

  12. Preliminary assessment report for National Guard Training Center, Georgia Army National Guard, Fort Stewart, Georgia

    International Nuclear Information System (INIS)

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard (GAARNG) facility near Hinesville, Georgia, known as the National Guard Training Center (NGTC). Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a priority basis for completing corrective actions (where necessary) in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining previous site activities, types and quantities of hazardous substances utilized, and potential pathways by which contamination could affect public health and the environment. The scope of this assessment is limited to the facilities and past activities contained within the NGTC. Preliminary assessment site score sheet information is also provided for the NGTC. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of Fort Stewart completed in 1992 (USATHAMA 1992) and to provide comprehensive information on the NGTC area for incorporation with information contained in that previous assessment for the entirety of Fort Stewart

  13. Total Gaseous Mercury Concentration Measurements at Fort McMurray, Alberta, Canada

    Directory of Open Access Journals (Sweden)

    Matthew T. Parsons

    2013-12-01

    Full Text Available Observations are described from total gaseous mercury (TGM concentrations measured at the Wood Buffalo Environmental Association (WBEA Fort McMurray—Patricia McInnes air quality monitoring station—from 21 October 2010 through 31 May 2013, inclusively. Fort McMurray is approximately 380 km north-northeast of Edmonton, Alberta, and approximately 30 km south of major Canadian oil sands developments. The average TGM concentration over the period of this study was 1.45 ± 0.18 ng∙m−3. Principal component analysis suggests that observed TGM concentrations are correlated with meteorological conditions including temperature, relative humidity, and solar radiation, and also ozone concentration. There is no significant correlation between ambient concentrations of TGM and anthropogenic pollutants, such as nitrogen oxides (NOX and sulphur dioxide (SO2. Principal component analysis also shows that the highest TGM concentrations observed are a result of forest fire smoke near the monitoring station. Back trajectory analysis highlights the importance of long-range transport, indicating that unseasonably high TGM concentrations are generally associated with air from the southeast and west, while unseasonably low TGM concentrations are a result of arctic air moving over the monitoring station. In general, TGM concentration appears to be driven by diel and seasonal trends superimposed over a combination of long-range transport and regional surface-air flux of gaseous mercury.

  14. Fort Irwin integrated resource assessment. Volume 3: Sitewide Energy Project identification for buildings and facilities

    Energy Technology Data Exchange (ETDEWEB)

    Keller, J.M.; Dittmer, A.L.; Elliott, D.B.; McMordie, K.L.; Richman, E.E.; Stucky, D.J.; Wahlstrom, R.R.; Hadley, D.L.

    1995-02-01

    The U.S. Army Forces Command (FORSCOM) has tasked the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL is designing to support energy-use decisions in the federal sector. This report provides the results of the fossil fuel and electric energy resource opportunity (ERO) assessments performed by PNL at the FORSCOM Fort Irwin facility located near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 2, Baseline Detail. The results of the analyses of EROs are presented in 16 common energy end-use categories (e.g., boilers and furnaces, service hot water, and building lighting). A narrative description of each ERO is provided, along with a table detailing information on the installed cost, energy and dollar savings; impacts on operations and maintenance (O&M); and, when applicable, a discussion of energy supply and demand, energy security, and environmental issues. A description of the evaluation methodologies and technical and cost assumptions is also provided for each ERO. Summary tables present the cost-effectiveness of energy end-use equipment before and after the implementation of each ERO and present the results of the life-cycle cost (LCC) analysis indicating the net present valve (NPV) and savings-to-investment ratio (SIR) of each ERO.

  15. A brief geological history of Cockspur Island at Fort Pulaski National Monument, Chatham County, Georgia

    Science.gov (United States)

    Swezey, Christopher S.; Seefelt, Ellen L.; Parker, Mercer

    2018-03-09

    Fort Pulaski National Monument is located on Cockspur Island in Chatham County, Georgia, within the Atlantic Coastal Plain province. The island lies near the mouth of the Savannah River, and consists of small mounds (hummocks), salt marshes, and sediment dredged from the river. A 1,017-foot (ft) (310-meter [m])-deep core drilled at Cockspur Island in 2010 by the U.S. Geological Survey revealed several sedimentary units ranging in age from 43 million years old to present. Sand and mud are present at drilling depths from 0 to 182 ft (56 m), limestone is present at depths from 182 ft (56 m) to 965 ft (295 m), and glauconitic sand is present at depths from 965 ft (295 m) to 1,017 ft (310 m). The limestone and the water within the limestone are referred to collectively as the Floridan aquifer system, which is the primary source of drinking water for the City of Savannah and surrounding communities. In addition to details of the subsurface geology, this fact sheet identifies the following geologic materials used in the construction of Fort Pulaski: (1) granite, (2) bricks, (3) sandstone, and (4) lime mud with oyster shells.

  16. Territoriality of feral pigs in a highly persecuted population on Fort Benning, Georgia

    Science.gov (United States)

    Sparklin, B.D.; Mitchell, M.S.; Hanson, L.B.; Jolley, D.B.; Ditchkoff, S.S.

    2009-01-01

    We examined home range behavior of female feral pigs (Sus scrofa) in a heavily hunted population on Fort Benning Military Reservation in west-central Georgia, USA. We used Global Positioning System location data from 24 individuals representing 18 sounders (i.e., F social groups) combined with markrecapture and camera-trap data to evaluate evidence of territorial behavior at the individual and sounder levels. Through a manipulative experiment, we examined evidence for an inverse relationship between population density and home range size that would be expected for territorial animals. Pigs from the same sounder had extensive home range overlap and did not have exclusive core areas. Sounders had nearly exclusive home ranges and had completely exclusive core areas, suggesting that female feral pigs on Fort Benning were territorial at the sounder level but not at the individual level. Lethal removal maintained stable densities of pigs in our treatment area, whereas density increased in our control area; territory size in the 2 areas was weakly and inversely related to density of pigs. Territorial behavior in feral pigs could influence population density by limiting access to reproductive space. Removal strategies that 1) match distribution of removal efforts to distribution of territories, 2) remove entire sounders instead of individuals, and 3) focus efforts where high-quality food resources strongly influence territorial behaviors may be best for long-term control of feral pigs.

  17. Seeing Savings from an ESPC Project in Fort Polk's Utility Bills

    Energy Technology Data Exchange (ETDEWEB)

    Shonder, J.A.

    2005-03-08

    Federal agencies have implemented many energy efficiency projects over the years with direct funding or alternative financing vehicles such as energy savings performance contracts (ESPCs). While it is generally accepted that these projects save energy and costs, the savings are usually not obvious in the utility bills. This is true for many valid technical reasons, even when savings are verified in other ways to the highest degree of certainty. However, any perceived deficiency in the evidence for savings is problematic when auditors or other observers evaluate the outcome of energy projects and the achievements of energy management programs. This report discusses under what circumstances energy savings should or should not be evident in utility bills. In the special case of a large ESPC project at the Army's Fort Polk, the analysis of utility bills carried out by the authors does unequivocally confirm and quantify savings. The data requirements and methods for arriving at definitive answers through utility bill analysis are demonstrated in our discussion of the Fort Polk project. The following paragraphs address why the government generally should not expect to see savings from ESPC projects in their utility bills. We also review lessons learned and best practices for measurement and verification (M&V) that can assure best value for the government and are more practical, straightforward, and cost-effective than utility bill analysis.

  18. Boomtown echo; In Fort McMurray, there is more to life than oil

    Energy Technology Data Exchange (ETDEWEB)

    Cullen, J.

    2004-08-01

    A photographic essay on life in boomtown Fort McMurray, centre of the oil sand industry in the Athabasca Valley of Alberta, is presented. While much of the attention in the area is focused on how Suncor, Syncrude and Albian Sands are attracting thousands of workers to extract billions of barrels of bitumen from the abundant oil sands, this photographic essay attempts to show life away from the giant shovels, trucks, and conveyors, and refineries and show what makes Fort McMurray one of Canada's fastest growing municipality, on course to double its 50,000 population to 100,000 by 2011. Centerpiece of the article is showing in words and pictures how life is lived and how experts and technicians and their families from Bolivia, Japan, Saudi Arabia, Jordan and Columbia interact with native Canadians and Canadians from all parts of the country. The focus is on how in the hustle-bustle of work, family and a vibrant community life, original intentions of staying only a few years to make money stretch into twenty years, and the boomtown reputation of swinging saloon doors and dusty raised wooden sidewalks give way to substantial community institutions, a full community life, and a desire to stay for good. 14 photos.

  19. A Cultural Resource Survey of the Offense Area of the Live Fire Maneuver Range, Fort Irwin, California.

    Science.gov (United States)

    1981-02-19

    ADA2 78 ACULTURAL RESOURCE SURVEY OF THE OFFENSE AREA 0F THE 3/ LIE FRE MANEUVER ANGE FORT IRWIN CA IFRNIA U RECON SAN DIEGO CA C S BULL 19 FEB 81 R...DESCRIPTION AND RESULTS 1 I B. RECOMMENDATIONS 2 * II. CULTURAL RESOURCE REVIEW 3 A. PROJECT AREA DESCRIPTION 3 1. Location 31 2. Geology 3 3. Biology 8 I...CULTURAL RESOURCE REVIEW I A. PROJECT AREA DESCRIPTION 1. Location. The offense area of the live fire maneu-I ver range is located at Fort Irwin, San

  20. 33 CFR 334.360 - Chesapeake Bay off Fort Monroe, Virginia; restricted area, U.S. Naval Base and Naval Surface...

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Chesapeake Bay off Fort Monroe, Virginia; restricted area, U.S. Naval Base and Naval Surface Weapon Center. 334.360 Section 334.360... AND RESTRICTED AREA REGULATIONS § 334.360 Chesapeake Bay off Fort Monroe, Virginia; restricted area, U...

  1. Fort Devens Feasibility Study for Group 1A Sites. Final Feasibility Study Shepley’s Hill Landfill Operable Unit Data Item A009

    Science.gov (United States)

    1995-02-01

    trichloroethane (DDT), and endosulfan sulfate were detected in method blank samples and that low concentrations of those compounds should be considered...Constructed Wetland Bioremediation (In situ)* Fort Devens WWTP Ayer POTW DISCHARGE On Site Fort Devens WWTP To Groundwater Off Site Ayer POTW Plow Shop...contaminants onto inorganic soil, neutralization and precipitation of contaminants. 3 Bioremediation (In situ). Introduces microorganisms, nutrients, and

  2. 78 FR 14512 - Foreign-Trade Zone 196-Fort Worth, TX, Foreign-Trade Subzone 196A-TTI, Inc., Approval of...

    Science.gov (United States)

    2013-03-06

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [S-2-2013] Foreign-Trade Zone 196--Fort Worth, TX, Foreign-Trade Subzone 196A--TTI, Inc., Approval of Additional Subzone Site, Fort Worth, TX On January 4, 2013, the Executive Secretary of the Foreign-Trade Zones (FTZ) Board docketed an application submitted...

  3. Mississippian Barnett Shale, Fort Worth basin, north-central Texas: Gas-shale play with multi-trillion cubic foot potential

    Science.gov (United States)

    Montgomery, S.L.; Jarvie, D.M.; Bowker, K.A.; Pollastro, R.M.

    2005-01-01

    The Mississippian Barnett Shale serves as source, seal, and reservoir to a world-class unconventional natural-gas accumulation in the Fort Worth basin of north-central Texas. The formation is a lithologically complex interval of low permeability that requires artificial stimulation to produce. At present, production is mainly confined to a limited portion of the northern basin where the Barnett Shale is relatively thick (>300 ft; >92 m), organic rich (present-day total organic carbon > 3.0%), thermally mature (vitrinite reflectance > 1.1%), and enclosed by dense limestone units able to contain induced fractures. The most actively drilled area is Newark East field, currently the largest gas field in Texas. Newark East is 400 mi2 (1036 km2) in extent, with more than 2340 producing wells and about 2.7 tcf of booked gas reserves. Cumulative gas production from Barnett Shale wells through 2003 was about 0.8 tcf. Wells in Newark East field typically produce from depths of 7500 ft (2285 m) at rates ranging from 0.5 to more than 4 mmcf/day. Estimated ultimate recoveries per well range from 0.75 to as high as 7.0 bcf. Efforts to extend the current Barnett play beyond the field limits have encountered several challenges, including westward and northward increases in oil saturation and the absence of lithologic barriers to induced fracture growth. Patterns of oil and gas occurrence in the Barnett, in conjunction with maturation and burial-history data, indicate a complex, multiphased thermal evolution, with episodic expulsion of hydrocarbons and secondary cracking of primary oils to gas in portions of the basin where paleotemperatures were especially elevated. These and other data imply a large-potential Barnett resource for the basin as a whole (possibly > 200 tcf gas in place). Recent assessment by the U.S. Geological Survey suggests a mean volume of 26.2 tcf of undiscovered, technically recoverable gas in the central Fort Worth basin. Recovery of a significant portion of

  4. Laboratory electrical resistivity analysis of geologic samples from Fort Irwin, California: Chapter E in Geology and geophysics applied to groundwater hydrology at Fort Irwin, California

    Science.gov (United States)

    Bloss, Benjamin R.; Bedrosian, Paul A.

    2015-01-01

    Correlating laboratory resistivity measurements with geophysical resistivity models helps constrain these models to the geology and lithology of an area. Throughout the Fort Irwin National Training Center area, 111 samples from both cored boreholes and surface outcrops were collected and processed for laboratory measurements. These samples represent various lithologic types that include plutonic and metamorphic (basement) rocks, lava flows, consolidated sedimentary rocks, and unconsolidated sedimentary deposits that formed in a series of intermountain basins. Basement rocks, lava flows, and some lithified tuffs are generally resistive (≥100 ohm-meters [Ω·m]) when saturated. Saturated unconsolidated samples are moderately conductive to conductive, with resistivities generally less than 100 Ω·m, and many of these samples are less than 50 Ω·m. The unconsolidated samples can further be separated into two broad groups: (1) younger sediments that are moderately conductive, owing to their limited clay content, and (2) older, more conductive sediments with a higher clay content that reflects substantial amounts of originally glassy volcanic ash subsequently altered to clay. The older sediments are believed to be Tertiary. Time-domain electromagnetic (TEM) data were acquired near most of the boreholes, and, on the whole, close agreements between laboratory measurements and resistivity models were found. 

  5. Assessment of groundwater, soil-gas, and soil contamination at the Vietnam Armor Training Facility, Fort Gordon, Georgia, 2009-2010

    Science.gov (United States)

    Guimaraes, Wladmir B.; Falls, W. Fred; Caldwell, Andral W.; Ratliff, W. Hagan; Wellborn, John B.; Landmeyer, James E.

    2011-01-01

    The U.S. Geological Survey, in cooperation with the U.S. Department of the Army Environmental and Natural Resources Management Office of the U.S. Army Signal Center and Fort Gordon, Georgia, assessed the groundwater, soil gas, and soil for contaminants at the Vietnam Armor Training Facility (VATF) at Fort Gordon, from October 2009 to September 2010. The assessment included the detection of organic compounds in the groundwater and soil gas, and inorganic compounds in the soil. In addition, organic contaminant assessment included organic compounds classified as explosives and chemical agents in selected areas. The assessment was conducted to provide environmental contamination data to the U.S. Army at Fort Gordon pursuant to requirements of the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process. Four passive samplers were deployed in groundwater wells at the VATF in Fort Gordon. Total petroleum hydrocarbons were detected above the method detection level at all four wells. The only other volatile organic compounds detected above their method detection level were undecane and pentadecane, which were detected in two of the four wells sampled. Soil-gas samplers were deployed at 72 locations in a grid pattern across the VATF. Total petroleum hydrocarbons were detected in 71 of the 72 samplers (one sampler was destroyed in the field and not analyzed) at levels above the method detection level, and the combined mass of benzene, toluene, ethylbenzene, and total xylene was detected above the detection level in 31 of the 71 samplers that were analyzed. Other volatile organic compounds detected above their respective method detection levels were naphthalene, 2-methyl-naphthalene, tridecane, 1,2,4-trimethylbenzene, and perchloroethene. Subsequent to the soil-gas survey, four areas determined to have elevated contaminant mass were selected and sampled for explosives and chemical agents. No detections of explosives or chemical agents above their

  6. Visual field defect as a presenting sign for hemorrhagic stroke caused by sildenafil

    Directory of Open Access Journals (Sweden)

    Mehdizadeh Morteza

    2008-01-01

    Full Text Available Herein, we describe the presenting symptoms, history, ophthalmic examination, visual fields and brain magnetic resonance imaging of a patient who developed left homonymous hemianopia due to right occipital lobe hemorrhage after ingestion of sildenafil citrate (Novagra Forte. To the best of our knowledge, association of homonymous hemianopia with sildenafil usage has not been reported before.

  7. 78 FR 31839 - Establishment of Class E Airspace; Beeville-Chase Field, TX

    Science.gov (United States)

    2013-05-28

    ... Meacham Blvd., Fort Worth, TX 76137; telephone (817) 321- 7716. SUPPLEMENTARY INFORMATION: History Federal... Industrial Airport, Beeville, TX (78 FR 18801, March 28, 2013). Subsequent to publication, the FAA found that... Industrial Airport is changed from Beeville, TX, to Beeville-Chase Field, TX. This correction is related to...

  8. The future-oriented repetitive thought (FoRT) scale: A measure of repetitive thinking about the future.

    Science.gov (United States)

    Miranda, Regina; Wheeler, Alyssa; Polanco-Roman, Lillian; Marroquín, Brett

    2017-01-01

    Repetitive thinking about the future has been suggested as one way in which individuals may become hopeless about the future. We report on a new scale assessing future-oriented repetitive thinking, termed the Future-Oriented Repetitive Thought (FoRT) Scale. In Study 1, an exploratory factor analysis was conducted with data from 1071 individuals who completed the scale. Study 2 describes a confirmatory factor analysis with a revised version of the scale on a sample of 612 individuals, a subsample of whom (N=99) also completed measures of repetitive thought (rumination, worry), hopelessness-related cognitions, and symptoms of depression and generalized anxiety disorder in order to examine evidence for the measure's convergent, discriminant, and concurrent validity. Study 3 examined the scale's concurrent validity in distinguishing between individuals with and without a history of suicidal ideation and attempts. A three-factor solution emerged in Study 1, and this solution was confirmed in Study 2. In addition, the FoRT scale demonstrated moderate associations with other measures of repetitive thought (rumination, worry), with hopelessness-related cognitions, and with symptoms of depression and generalized anxiety. Finally, the FoRT scale distinguished between individuals with and without a history of suicidal ideation and attempts. Cross-sectional data limit conclusions that can be drawn about directionality. These findings suggest that the newly developed FoRT scale is a reliable and valid measure of future-oriented repetitive thought. Copyright © 2016 Elsevier B.V. All rights reserved.

  9. Fort Simpson, Northwest Territories, Canada. Revised Uniform Summary of Surface Weather Observations (RUSSWO). Parts A-F.

    Science.gov (United States)

    1972-01-25

    No. Obo , Moon Not. of Houri with Tonmpelrotre ul 10 91/ .... 19 19 - o 6/ IS in o 2 6 ------------------ -------------------------- S1 1 DATA PR...250 AIR FORCED ENV IRONMENTAL TECHICAL APPLICATIONS CENTER-ECr F/6 4/FORT SIMPSON, NORTHWEST RRITORIES. CANADA. REVISED UNIFORm SU--T(, 1CLAS7IFIEO

  10. The effect of nasal application of cocaine/adrenaline on blood loss in Le Fort I osteotomies

    NARCIS (Netherlands)

    de Lange, J.; Baas, E.M.; Horsthuis, R.B.G.; Booij, A.

    2008-01-01

    Cocaine is a very potent vasoconstrictor that is used by ENT specialists to reduce blood loss and enhance visibility during nasal surgery. In orthognathic surgery, especially Le Fort I procedures, excessive blood loss is a relatively frequent complication. In this study, a prospective randomized

  11. Quality site seasonal report, Fort Devens Launderette, SFBP (Solar in Federal Buildings Program) 1751, December 1984 through June 1985

    Energy Technology Data Exchange (ETDEWEB)

    Logee, T.L.

    1987-10-15

    The active solar Domestic Hot Water (DHW) system at the Fort Devens Launderette was designed and constructed as part of the Solar in Federal Buildings Program (SFBP). This retrofitted system was one of eight systems selected for quality monitoring. The purpose of this monitoring effort was to document the performance of quality state-of-the-art solar systems in large federal buildings. The launderette is part of the Post Exchange complex at the Fort Devens Army Post in Fort Devens, Massachusetts. The solar system preheats hot water for the coin operated laundry which has an estimated 25,000 customers per year. There are 108 collector panels comprising the 2563-square foot collector array. Collected solar energy is stored in a 3800-gallon tank. Propylene glycol is used to protect the solar array from freezing. Two immersed heat exchangers provide heat transfer from the propylene glycol to directly heat the DHW supply water in the storage tank. Auxiliary energy is supplied by gas and oil boilers. This solar system can be considered one of a kind and as such is a prototype. The lessons learned from building and operating this system should be used to correct design deficiencies and improve the performance of future solar systems for this application. Highlights of the system performance at the Fort Devens Launderette solar system during the December 1984 through June 1985 monitoring period are presented in this report.

  12. Archaeological Surveys and Evaluations of Four Construction Areas in the Vicinity of Fort Jackson, Plaquemines Parish, Louisiana

    Science.gov (United States)

    1992-04-01

    another of Seventh Infantry. On December 15, Major W.H. Overton of the Rifle Corps replaced Captain Charles Wollstonecraft as commander of Fort St. Philip...annotated by Patricia Galloway. In LaSalle, the Mississippi, and the Gulf. Three Primary Documents, edited by Robert S. Weddle, Mary Christine Morkovsky

  13. Two Expeditions to Capture Fort Duquesne: A Study in Understanding the Operational Environment and Attendant Failure (1755) and Success (1758)

    Science.gov (United States)

    2013-03-27

    Empire in the Ohio Valley………………………………………………….…5 The Objective: Fort Duquesne…………………………………………………………....7 The Physical Enviroment

  14. Fort Cochin in Kerala 1750-1830 : the social condition of a Dutch community in an Indian milieu

    NARCIS (Netherlands)

    Singh, Anjana

    2007-01-01

    Focussing on individuals and institutions, the economic and social condition of the people of Fort Cochin between 1781 and 1830 has been studied. This study of the Dutch East India Company's (VOC) establishment on the south west coast of India provides a detailed research into the functioning of the

  15. Serving as the Keystone: Collaborative Reform, Relinquishing Authority, and the Link to Higher Education in the Fort Worth Public Schools.

    Science.gov (United States)

    Aley, Shelley; Vandenberg, Peter

    Established in 1984, the twofold purpose of the national award-winning Keystone Writing Project of the Fort Worth Independent School District is to (1) create a staff development program to assist teachers in designing strategies for teaching writing; and (2) to set up a district writing program that meets the needs of all students. During the…

  16. Effets d'un acide fort sur la réaction de la DPPH avec deux huiles ...

    African Journals Online (AJOL)

    Effets d'un acide fort sur la réaction de la DPPH avec deux huiles essentielles de deux plantes aromatiques acclimatées au Togo. Kokou Agbékonyi Agbodan, Kokouvi Dotse, Kossi Honoré Koumaglo, K. Issa Saloufou ...

  17. Fort Huachuca to Benefit from New Solar Technology: Dish-Stirling System Couples Solar Power with Engine to Generate Electricity

    National Research Council Canada - National Science Library

    1995-01-01

    ... in partnership with industry. A prototype dish-Stirling solar system, which consists of a large dish of solar concentrators and a Stirling heat engine, will be installed at Fort Huachuca in July and should be in operation about two weeks later...

  18. 78 FR 29113 - Reorganization of Foreign-Trade Zone 241 Under Alternative Site Framework, Fort Lauderdale, Florida

    Science.gov (United States)

    2013-05-17

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Order No. 1898] Reorganization of Foreign-Trade Zone 241 Under Alternative Site Framework, Fort Lauderdale, Florida Correction In notice document 2013-11203 appearing on pages 27364-27365 in the issue of Friday, May 10, 2013, make the following correction...

  19. 75 FR 14127 - Foreign-Trade Zone 196 -- Fort Worth, Texas, Application for Reorganization/Expansion under...

    Science.gov (United States)

    2010-03-24

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket 18-2010] Foreign-Trade Zone 196 -- Fort Worth, Texas, Application for Reorganization/Expansion under Alternative Site Framework An application... grantees for the establishment or reorganization of general-purpose zones and can permit significantly...

  20. 78 FR 32238 - Foreign-Trade Zone 168-Dallas/Fort Worth, Texas Application for Reorganization/Expansion

    Science.gov (United States)

    2013-05-29

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [B-52-2013] Foreign-Trade Zone 168--Dallas/Fort Worth, Texas Application for Reorganization/Expansion An application has been submitted to the Foreign-Trade Zones (FTZ) Board by the Metroplex International Trade Development Corporation, grantee of FTZ 168...

  1. 78 FR 27364 - Reorganization of Foreign-Trade Zone 241 Under Alternative Site Framework Fort Lauderdale, Florida

    Science.gov (United States)

    2013-05-10

    ... Zone 241 Under Alternative Site Framework Fort Lauderdale, Florida Pursuant to its authority under the...-48-2012, docketed 6/27/2012) for authority to reorganize under the ASF with a service area comprised... Everglades Customs and Border Protection port of entry, to modify Site 1 by removing acreage, to expand Sites...

  2. First records of two species of mammals in the Huachuca Mountains: results of ecological stewardship at Fort Huachuca

    Science.gov (United States)

    Ronnie Sidner; H. Sheridan Stone

    2005-01-01

    We report the first voucher of the cliff chipmunk (Neotamias dorsalis) and observations of Brazilian free-tailed bats (Tadarida brasiliensis) from the Huachuca Mountains, Arizona, where these species had not been documented. While presence of T. brasiliensis was expected on Fort Huachuca, N. dorsalis was a surprise after a century...

  3. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan

    International Nuclear Information System (INIS)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead

  4. Fort Devens. Cold Climate, Energy-Efficient, Market-Rate Townhomes

    Energy Technology Data Exchange (ETDEWEB)

    Zoeller, William [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States); Slattery, Matt [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States); Grab, Joanna [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States)

    2013-08-01

    In 2009, Mass Development issued a RFP for teams to develop moderately priced high-efficiency homes on two sites within the Devens Regional Enterprise Zone. MassDevelopment, a Massachusetts agency that owns the Devens site (formerly Fort Devens Army Base, in Harvard, Massachusetts), set a goal of producing a replicable example of current and innovative sustainable building practices with a near-zero energy potential. Metric Development, as primary developer and construction manager, formed one of the successful teams that included CARB and Cambridge Seven Architects (C7A). This report describes the development of high performance, affordable, and replicable designs developed by the team in test homes and plans to move forward with the next buildings.

  5. ATRAVÉS: INHOTIM AMA LUISA STRINA E FORTES VILAÇA

    Directory of Open Access Journals (Sweden)

    Gedley Belchior Braga

    2009-12-01

    Full Text Available Este artigo enfoca a exposição Através, em Inhotim, coleção e propriedade particular do colecionador Bernardo Paz, ambas situadas nos arredores da cidade de Brumadinho, cerca de 60 quilômetros de Belo Horizonte. Além de uma visão crítica de parte do acervo exposto e publicado com o mesmo título Através, em catálogo da Instituição, verificam-se aqui os mecanismos curatoriais que exercitam estratégias de reafirmação do poder mercadológico do sistema artístico brasileiro, com a nítida predominância da presença de artistas brasileiros representados pelas galerias Luisa Strina e Fortes Vilaça, ambas em São Paulo.

  6. Fortællinger og storylines i og uden for skolen

    DEFF Research Database (Denmark)

    Hetmar, Vibeke

    2016-01-01

    Artiklen præsenterer to forskellige perspektiver på fortællingen: et 1.per-sons¬¬perspektiv der i en didaktisk kontekst kan knyttes til henholdsvis lærer og elev, og et 3.personsperspektiv hvor det intersubjektive kommer i forgrunden og som i artiklen manifesterer sig som et kulturperspektiv. I...... skolen sikre en entydig storyline der er genkendelig i det eksterne domæne, eller også må man forsøge sig med mindre ressourcekrævende forløb for eksempel tilrettelagt som didaktiske scenarier. Her inviteres eleverne til forløb der kobler 1. og 3.personsperspektiver, refe¬rerer til en entydig storyline...

  7. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  8. Preliminary assessment report for Fort William Henry Harrison, Montana Army National Guard, Helena, Montana

    International Nuclear Information System (INIS)

    DuWaldt, J.; Meyer, T.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at a Montana Army National Guard (MTARNG) property near Helena, Montana. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort William Henry Harrison property, requirements of the Department of Defense Installation Restoration Program

  9. Chemical Composition of Essential Oil from the Peel of Chinese Torreya grandis Fort

    Directory of Open Access Journals (Sweden)

    Tao Feng

    2011-01-01

    Full Text Available The composition of the peel essential oil of Torreya grandis fort obtained by cold pressing and steam distillation was determined by GC and GC/MS. 62 constituents accounting for 99.6% of the total pressed oil were identified while 59 compounds accounting for 99.4% of the steam distilled oil were identified. Limonene (35.6–37.1%, α-pinene (20.1–24.1%, and δ-carene (3.3–3.9 were the major constituents. Others include γ-carene (3.8-3.9%, germacrene D (2.5–2.9%, and β-farnesene (2.7-2.8%.

  10. The Fort McMurray, Alberta wildfires: Emergency and recovery management of healthcare services.

    Science.gov (United States)

    Matear, David

    2017-01-01

    One of the largest wildfires in Canadian history raged through northern Alberta in May to July 2016, and prompted the largest emergency air evacuation in Canadian history. Central to the challenges were the evacuation of a regional hospital, and the emergency and recovery management associated with healthcare services. This paper describes multiple phases of emergency and recovery management, which employed and adapted the Incident Command System to healthcare services. There were no injuries reported throughout the medical evacuation and recovery of medical services. The leadership and management of healthcare services achieved the goals of evacuating patients and staff effectively, supporting emergency first responders and the re-entry of the population to Fort McMurray.

  11. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  12. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  13. Le traité de Fort Jackson, 9 août 1814

    Directory of Open Access Journals (Sweden)

    Jean‑Marc Serme

    2006-04-01

    Full Text Available This paper aims to show the motives and goals of the different actors of the War of 1812 as expressed through the Muscogee Creek War (1813‑1814. The fate of the region was sealed when a gigantic land cession was conceded by Native Americans in the Treaty of Fort Jackson. Aug.9, 1814, symbolizes both the end of Native American clout in the Old Southwest and the beginning of a new era in Southern history. Andrew Jackson played a key‑role in this shift in power. Other individuals, but also social groups and entire nations were involved in a complex web of relationships and cultural, political and economic conflicts.

  14. Disinformation squared: was the HIV-from-Fort-Detrick myth a Stasi success?

    Science.gov (United States)

    Geissler, Erhard; Sprinkle, Robert Hunt

    2013-01-01

    When in May 1983 the acquired immunodeficiency syndrome (AIDS) was first securely attributed to a virus, eventually called the human immunodeficiency virus (HIV), many controversies arose. Among these was one centering on HIV's origin. A startling hypothesis, called here the "HIV-from-Fort-Detrick myth," asserted that HIV had been a product, accidental or intentional, of bioweaponry research. While its earliest identifiable contributors were in the West, this myth's most dynamic propagators were in the East. The Soviet security service, the KGB, took "active measures" to create and disseminate AIDS disinformation beginning no later than July 1983 and ending no earlier than October 1987. The East German security service, a complex bureaucracy popularly known as "the Stasi," was involved, too, but how early, how deeply, how uniformly, how ably, and how successfully has not been clear. Following German reunification, claims arose attributing to the Stasi the masterful execution of ingenious elements in a disinformation campaign they helped shape and soon came to dominate. We have tested these claims. Was the HIV-from-Fort-Detrick myth a Stasi success? Primary sources were documents and photographs assembled by the Ministry of State Security (MfS) of the German Democratic Republic (GDR or East Germany), the Ministry of Interior of the People's Republic of Bulgaria, and the United States Department of State; the estate of myth principals Jakob and Lilli Segal; the "AIDS box" in the estate of East German literary figure Stefan Heym; participant-observer recollections, interviews, and correspondence; and expert interviews. We examined secondary sources in light of primary sources. The HIV-from-Fort-Detrick myth had debuted in print in India in 1983 and had been described in publications worldwide prior to 1986, the earliest year for which we found any Stasi document mentioning the myth in any context. Many of the myth's exponents were seemingly independent conspiracy

  15. Segmental LeFort I osteotomy for treatment of a class III malocclusion with temporomandibular disorder

    Directory of Open Access Journals (Sweden)

    Marcos Janson

    2008-08-01

    Full Text Available This article reports the case of a 19-year-old young man with Class III malocclusion and posterior crossbite with concerns about temporomandibular disorder (TMD, esthetics and functional problems. Surgical-orthodontic treatment was carried out by decompensation of the mandibular incisors and segmentation of the maxilla in 4 pieces, which allowed expansion and advancement. Remission of the signs and symptoms occurred after surgical-orthodontic intervention. The maxillary dental arch presented normal transverse dimension. Satisfactory static and functional occlusion and esthetic results were achieved and remained stable. Three years after the surgical-orthodontic treatment, no TMD sign or symptom was observed and the occlusal results had not changed. When vertical or horizontal movements of the maxilla in the presence of moderate maxillary constriction are necessary, segmental LeFort I osteotomy can be an important part of treatment planning.

  16. Insights on the Fort Davis — Mc Donald site stability: a GPS footprint

    Science.gov (United States)

    Vigny, Christophe

    1996-05-01

    In june 1990, NASA's Crustal Dynamics Project (CDP) has established a geodetic footprint for the Satellite Laser Ranging (SLR) and Very Long Baseline Interferometry (VLBI) systems located near Fort Davis, Texas using GPS measurements. The purpose of such a footprint is to assess both the tectonic and physical stability of the main observing monuments. Included in the survey were four new monuments forming a 20 to 30 km quadrilateral, as well as four existing monuments near the McDonald Laser Ranging System (MLRS), the Harvard Radio Astronomy (HRA) 85' antenna, and the new 85' antenna of the Very Long Baseline Array (VLBA). This network was partly reoccupied by the University of Texas Austin in may 1992. Three additional sites not observed in 1990 were occupied, two of them being old monuments in the observatory area (Harvard-RM4 and VLBA-SLR), and a new monument 80 km away across the closest active fault near Valentine, Texas. Thanks to existing ties between nearby monuments in the observatory area, the comparison between the two epochs was made possible. Significant motion of more than 1 cm of any of the implied sites over a two year period can be ruled out. Despite this quite reassuring results, smaller displacements cannot be detected mainly because of the poor quality of the 1990 data. Therefore it is strongly advised that a third occupation of the footprint sites takes place in the close future. Such a survey, occuring five years after the first one and three years after the second one, should definitely answer the questions on the Fort Davis area stability at the millimeter per year level.

  17. Limited Energy Study of Facilities in the Historic, Red Brick Main Post Area at Fort Bragg, North Caroline. Field Notes

    National Research Council Canada - National Science Library

    1995-01-01

    ...: Install High Efficiency Lighting systems. Each form includes the specific lighting system information by building and the building's functional areas, such as corridors, latrines, offices, etc...

  18. La fouille du fort Saint-Georges à Chinon (Indre-et-Loire. Premiers résultats The excavation of fort Saint-Georges at Chinon (Indre-et-Loire. First results

    Directory of Open Access Journals (Sweden)

    Bruno Dufaÿ

    2006-05-01

    Full Text Available Cette note présente les premiers résultats des fouilles menées en 2003 et 2004 sur la quasi-totalité du fort Saint-Georges à Chinon (Indre-et-Loire. Celui-ci est l’un des trois éléments de la forteresse médiévale qui domine la ville. La fouille a permis de préciser la fonction du fort, construit dans la deuxième moitié du XIIe s., à l’époque où Chinon est le centre administratif des possessions continentales des Plantagenêt, rois d’Angleterre. Du point de vue militaire, il formait une fortification avancée, protégeant le château principal, selon une structure que Richard Cœur de Lion appliquera au Château Gaillard. À l’intérieur, de vastes bâtiments constituaient des logis, conçus peut-être au départ pour héberger la chancellerie royale.This article presents the first results of the excavations undertaken in 2003 and 2004 over almost all of the Fort Saint-Georges at Chinon (Indre-et-Loire, one of three elements of the medieval fortress which dominates the town. The excavation enabled us to clarify the function of the fort, built in the 2nd half of the 12th century at a time when Chinon was the administrative centre of the continental possesions of the Plantagenet King of England. From a military point of view, it formed an advanced fortification protecting the main castle, within a structure that Richard the Lionheart would apply to the Chayeau Gaillard. Inside, some vast buildings made up the dwellings, designed perhaps initially to house the royal chanceller.

  19. Airway space changes after nasopharyngeal adenoidectomy in conjunction with Le Fort I osteotomy.

    Science.gov (United States)

    Wolford, Larry M; Perez, Daniel; Stevao, Eber; Perez, Enrique

    2012-03-01

    The purpose of the present study was to evaluate the nasopharyngeal airway changes after transnasal adenoidectomy and to determine whether a specific facial morphologic type is associated with hypertrophied nasopharyngeal adenoids. The nasopharyngeal adenoid tissues are present during childhood but usually spontaneously atrophy by 12 to 14 years of age. However, some patients have hypertrophied nasopharyngeal adenoid tissues that can remain after 14 years of age and can cause dysfunction of the eustachian tubes, cause nasal airway obstruction, affect speech, and adversely alter facial growth. In these cases, nasopharyngeal adenoidectomy could be indicated. In patients requiring orthognathic surgery, the adenoidectomy can be performed using a transnasal approach in conjunction with maxillary Le Fort I osteotomy, eliminating the need for a separate surgical procedure. The records of 40 patients, 27 females and 13 males, with an average age of 16.77 years (range, 13 to 20) who had undergone transnasal adenoidectomy in conjunction with orthognathic surgery that included Le Fort I osteotomy were analyzed. The pre- and postoperative lateral cephalograms were analyzed for airway changes after surgery, with an average interval between surgery and the postoperative radiographs of 7.36 months. The measurements of the airway changes were taken from the junction of the atlas and the base of the skull to the most anterior area of the adenoid tissue before surgery and to the posterior pharyngeal wall postoperatively, parallel to the Frankfort horizontal plane. The maxillary depth, mandibular depth, and occlusal plane angulation measurements were recorded preoperatively to assess the most common skeletal type presenting with hyperplastic nasopharyngeal adenoid tissues. All patients showed an increased airway space after adenoidectomy, with an average improvement of 8.71 mm (range, 3 to 18). Of the 40 patients, 21 were skeletal Class II (ANB >4°), 6 skeletal Class III (ANB 12

  20. Paleofaunal and Environmental Research on Miocene Fossil Sites TVOR SE and TVOR S on Fort Polk, Louisiana, with Continued Survey, Collection, Processing, and Documentation of other Miocene Localities

    National Research Council Canada - National Science Library

    Schiebout, Judith

    2004-01-01

    Focus of paleontological research on the Miocene of Fort Polk is currently the marine locality TVOR SE, which also has yielded large and small terrestrial Miocene vertebrates, and a single Cretaceous...

  1. FLODIS: a computer model to determine the flow distribution and thermal response of the Fort St. Vrain reactor

    Energy Technology Data Exchange (ETDEWEB)

    Paul, D.D.

    1976-06-01

    FLODIS is a combined heat transfer and fluid flow analysis calculation written specifically for the core of the Fort St. Vrain reactor. It is a lumped-node representation of the 37 refueling regions in the active core. Heat conduction to the coolant and in the axial direction is represented; however, the effect of conduction between refueling regions is not included. The calculation uses the specified operating conditions for the reactor at power to determine appropriate loss coefficients for the variable orifices in each refueling region. Flow distributions following reactor trip and a reduction in coolant pressure and flow are determined assuming that the orifice coefficients remain constant. Iterative techniques are used to determine the distribution of coolant flow as a function of time during the transient. Results are presented for the evaluation of the transient for the Fort St. Vrain reactor following depressurization and cooling with two circulators operating at 8000 rpm.

  2. Structural changes in Rio Bravo´s historical flow of water in El Paso and Fort Quitman

    Directory of Open Access Journals (Sweden)

    Vicente Germán–Soto

    2012-07-01

    Full Text Available We analyze the surface water flow of Rio Grande between El Paso–Ciudad Juarez and Fort Quitman and estimate the structural changes occurred during 1923–2005. The study is based on a set of econometric equations to examine trends and turning points in data of time series. We find that water flow registered two important structural changes estimated in 1950 and 1972. There was a reduction in the water flow after the first structural change that is linked to the 1944 Treaty; whilethe second structural change is associated toincreases of the water flowthat seem to respond to the observation of the American flower and fauna law. In conclusion, the lower Rio Grande located between Ciudad–Juarez and Fort Quitman has received a minorwater flow from 1950.

  3. [Russian experience with Vitaprost Forte suppositories in patients with lower urinary tract symptoms and benign prostatic hyperplasia: comparative analysis of studies].

    Science.gov (United States)

    Korneev, I A

    2017-07-01

    The article reviews the domestic studies showing the efficacy and safety of suppositories containing prostate extract (Samprost substance) Vitaprost Forte in treating men with lower urinary tract symptoms secondary to benign prostatic hyperplasia. The data obtained by Russian specialists confirm the effectiveness of Vitaprost Forte suppositories in managing patients with moderate LUTS and infravesical obstruction caused by BPH to reduce dysuria, improve the quality of life and normalize urodynamic parameters.

  4. Site Investigation Report Fort Devens Groups 3,5, and 6. Volume 1 of 2: Report Text

    Science.gov (United States)

    1996-01-01

    COMPLETION DIAGRAMS APPENDIX D - STREAM-FLOW CALCULATIONS AND DISCUSSION APPENDIX E - PROJECT ANALYTE LIST/CRLS APPENDIX F - LABORATORY QC RESULTS APPENDIX G...of the floral and faunal diversity at the installation. 2.2.3 Ecology Fort Devens encompasses numerous terrestrial, wetland, and aquatic habitats in...various successional stages. Floral and faunal diversity is strengthened by the ABB Environmental Services, Inc. GRP356.SI 6917.07 01/24/96 2-4 SECTION

  5. Utility Monitoring and Control System (UMCS) and Utility Metering Plan and Specifications for Fort Leonard Wood, MO

    Science.gov (United States)

    2017-06-22

    MDMS website as part of the Army Metering Program ( AMP ). An alternate means to monitor these meters via LonWorks BCS would be to add a pulse output...impossible), but Huntsville efforts and intent to connect MDMS metering (not part of an ESPC) as part of the AMP to the existing Honeywell UMCS...support The Honeywell UMCS can support the AMP metering requirement and pass Fort Leonard Wood meter data to MDMS. The meter data obtained locally

  6. Effects of Construction of the Digital Multipurpose Range Complex (DMPRC) on Riparian and Stream Ecosystems at Fort Benning, Georgia. Addendum

    Science.gov (United States)

    2009-06-01

    communities recovered. We believe the contrasting, stream-specific results from our biotic water quality work (i.e., large biotic impacts in one system ...and G. Holon . Riparian ecosystems at Fort Benning, Georgia: Impact assessment and restoration. Presented at the SERDP/ESTCP Partners in...Savannah, GA. Mulholland, P. J., J. Feminella, B. G. Lockaby, J. Houser, K. Maloney, S. Miller, R. Mitchell, and G. Holon . Riparian ecosystems

  7. An annotated list of aquatic insects of Fort Sill, Oklahoma, excluding diptera with notes on several new state records

    Science.gov (United States)

    Zuellig, R.E.; Kondratieff, B.C.; Schmidt, J.P.; Durfee, R.S.; Ruiter, D.E.; Prather, I.E.

    2006-01-01

    Qualitative collections of aquatic insects were made at Fort Sill, Lawton, Oklahoma, between 2002 and 2004. Ephemeroptera, Plecoptera, Trichoptera, Odonata, Coleoptera, aquatic Heteroptera, Neuroptera, and Megaloptera were targeted. Additional records are included from a survey that took place in 1999. More than 11,000 specimens from more than 290 collections were examined. Based on the current understanding of aquatic insect systematics, 276 taxa distributed over 8 orders, 46 families, and 141 genera were identified. Twenty-three of the 276 taxa, Plauditus texanus Wiersema, Tricorythodes allectus (Needham), Palmacorixa nana walleyi Hungerford, Climacia chapini Partin and Gurney, Oxyethira forcipata Mosely, Oxyethira janella Denning, Triaenodes helo Milne, Ylodes frontalis (Banks), Acilius fraternus Harris, Coptotomus loticus Hilsenhoff, Coptotomus venustus (Say), Desmopachria dispersa Crotch, Graphoderus liberus (Say), Hydrovatus pustulatus (Melsheimer), Hygrotus acaroides (LeConte), Liodessus flavicollis (LeConte), Uvarus texanus (Sharp), Gyrinus woodruffi Fall, Haliplus fasciatus Aube, Haliplus lewisii Crotch, Haliplus tortilipenis Brigham & Sanderson, Chaetarthria bicolor Sharp, Epimetopus costatus complex, and Hydrochus simplex LeConte are reported from Oklahoma for the first time. The three most diverse orders included Coleoptera (86 species), Odonata (67 species) and Trichoptera (59 species), and the remaining taxa were distributed among Heteroptera, (30 species), Ephemeroptera (21 species), Plecoptera (6 species), Megaloptera (4 species), and Neuroptera (3 species). Based on previous published records, many of the species collected during this study were expected to be found at Fort Sill; however, 276 taxa of aquatic insects identified from such a small geographic area is noteworthy, especially when considering local climatic conditions and the relatively small size of Fort Sill (38,300 ha). Despite agricultural practices in Oklahoma, the dust bowl days

  8. Demonstration of Electro-Osmotic Pulse Technology in Earth-Covered Magazines at Fort A.P. Hill, VA

    Science.gov (United States)

    2009-08-01

    damage, and growth of pathogens such as mold and microorganisms. At Fort A.P. Hill, VA, large amounts of water seep through the concrete walls...to the walls using galvanized steel angles. The an- gles were held in place using screws going through the wall and base with nuts to keep them...between them at the apex of the arch and held in place using nuts . Figure C-10 shows the completed model under testing. Prior to assembling the

  9. Groundwater modeling to evaluate interaquifer leakage in the Floridan aquifer system near Hunter Army Airfield and Fort Stewart

    Science.gov (United States)

    Cherry, Gregory S.

    2011-01-01

    Simulations using a modified regional groundwater- flow model were used to determine the amount of leakage from the Upper Floridan aquifer (UFA) through the Lower Floridan confining unit (LFC) into the Lower Floridan aquifer (LFA) resulting from pumping about 1 million gallons per day at newly constructed LFA production wells at Hunter Army Airfield and Fort Stewart in coastal Georgia. Simulated steadystate drawdown at each of the LFA production wells closely matched observed drawdown during a 72-hour aquifer test with the observed water levels reaching steady-state by the end of the test period. However, simulated drawdown was greater than observed drawdown in the UFA because of the short duration of the aquifer test and the time required for groundwater movement through the LFC into the LFA. Steadystate simulations provide an estimate of leakage based on the long-term continuous operation of each production well. Results of model simulations indicate that interaquifer leakage accounts for 48 percent of the flow to the well at Hunter Army Airfield, and 98 percent of the flow to the well at Fort Stewart. Simulated results near the Hunter Army Airfield production well indicated that 65 percent of the leakage from the UFA to the LFA occurs within a 1-mile radius, whereas simulated results near the Fort Stewart production well indicated 80-percent leakage from the UFA to the LFA within the same radius. The greater amount of leakage to the production well near Fort Stewart can be attributed to the higher transmissivity of the UFA and higher vertical hydraulic conductivity in the LFC near the well.

  10. Clinical and microbiologic characteristics of children treated at the Fort de France university hospital after the 2010 Haiti earthquake.

    Science.gov (United States)

    Arquès, Isabelle; Vincent, Martine; Olive, Claude; Cabié, André; Canivet, Isabelle; Hochedez, Patrick

    2013-05-01

    Few data related to the care of children injured in an earthquake are available. The objective of our study was to analyze the results of clinical and microbiologic characteristics of children treated in a Fort de France hospital after the Haiti earthquake. Bacteria were mainly Gram-negative bacteria. Some of these infections seemed to be environmental; a significant portion was related to acquisition during hospitalization.

  11. Assessment of groundwater, soil-gas, and soil contamination at the Vietnam Armor Training Facility, Fort Gordon, Georgia, 2009-2011

    Science.gov (United States)

    Guimaraes, Wladmir B.; Falls, W. Fred; Caldwell, Andral W.; Ratliff, W. Hagan; Wellborn, John B.; Landmeyer, James E.

    2012-01-01

    The U.S. Geological Survey, in cooperation with the U.S. Department of the Army Environmental and Natural Resources Management Office of the U.S. Army Signal Center and Fort Gordon, Georgia, assessed the groundwater, soil gas, and soil for contaminants at the Vietnam Armor Training Facility (VATF) at Fort Gordon, from October 2009 to September 2011. The assessment included the detection of organic compounds in the groundwater and soil gas, and inorganic compounds in the soil. In addition, organic contaminant assessment included organic compounds classified as explosives and chemical agents in selected areas. The assessment was conducted to provide environmental contamination data to the U.S. Army at Fort Gordon pursuant to requirements of the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process. This report is a revision of "Assessment of soil-gas, surface-water, and soil contamination at the Vietnam Armor Training Facility, Fort Gordon, Georgia, 2009-2010," Open-File Report 2011-1200, and supersedes that report to include results of additional samples collected in July 2011. Four passive samplers were deployed in groundwater wells at the VATF in Fort Gordon. Total petroleum hydrocarbons and benzene and octane were detected above the method detection level at all four wells. The only other volatile organic compounds detected above their method detection level were undecane and pentadecane, which were detected in two of the four wells. Soil-gas samplers were deployed at 72 locations in a grid pattern across the VATF on June 3, 2010, and then later retrieved on June 9, 2010. Total petroleum hydrocarbons were detected in 71 of the 72 samplers (one sampler was destroyed in the field and not analyzed) at levels above the method detection level, and the combined mass of benzene, toluene, ethylbenzene, and total xylene (BTEX) was detected above the detection level in 31 of the 71 samplers that were analyzed. Other volatile organic compounds

  12. Spatial and Temporal Mapping of the Evolution of the Miami-Fort Lauderdale-West Palm Beach Metropolitan Statistical Area (MSA)

    Science.gov (United States)

    Rochelo, Mark

    Urbanization is a fundamental reality in the developed and developing countries around the world creating large concentrations of the population centering on cities and urban centers. Cities can offer many opportunities for those residing there, including infrastructure, health services, rescue services and more. The living space density of cities allows for the opportunity of more effective and environmentally friendly housing, transportation and resources. Cities play a vital role in generating economic production as entities by themselves and as a part of larger urban complex. The benefits can provide for extraordinary amount of people, but only if proper planning and consideration is undertaken. Global urbanization is a progressive evolution, unique in spatial location while consistent to an overall growth pattern and trend. Remotely sensing these patterns from the last forty years of space borne satellites to understand how urbanization has developed is important to understanding past growth as well as planning for the future. Imagery from the Landsat sensor program provides the temporal component, it was the first satellite launched in 1972, providing appropriate spatial resolution needed to cover a large metropolitan statistical area to monitor urban growth and change on a large scale. This research maps the urban spatial and population growth over the Miami - Fort Lauderdale - West Palm Beach Metropolitan Statistical Area (MSA) covering Miami-Dade, Broward, and Palm Beach counties in Southeast Florida from 1974 to 2010 using Landsat imagery. Supervised Maximum Likelihood classification was performed with a combination of spectral and textural training fields employed in ERDAS Image 2014 to classify the images into urban and non-urban areas. Dasymetric mapping of the classification results were combined with census tract data then created a coherent depiction of the Miami - Fort Lauderdale - West Palm Beach MSA. Static maps and animated files were created

  13. Warm Dry Weather Conditions Cause of 2016 Fort McMurray Wild Forest Fire and Associated Air Quality

    Science.gov (United States)

    de Azevedo, S. C.; Singh, R. P.; da Silva, E. A., Sr.

    2016-12-01

    The climate change is evident from the increasing temperature around the world, day to day life and increasing frequency of natural hazards. The warm and dry conditions are the cause of frequent forest fires around the globe. Forest fires severely affect the air quality and human health. Multi sensor satellites and dense network of ground stations provide information about vegetation health, meteorological, air quality and atmospheric parameters. We have carried out detailed analysis of satellite and ground data of wild forest fire that occurred in May 2016 in Fort McMurray, Alberta, Canada. This wild forest fire destroyed 10 per cent of Fort McMurray's housing and forced more than 90,000 people to evacuate the surrounding areas. Our results show that the warm and dry conditions with low rainfall were the cause of Fort McMurray wild fire. The air quality parameters (particulate matter, CO, ozone, NO2, methane) and greenhouse gases measured from Atmospheric Infrared Sounder (AIRS) satellite show enhanced levels soon after the forest fire. The emissions from the forest fire affected health of population living in surrounding areas up to 300 km radius.

  14. Accelerated orthodontic tooth movement following le fort I osteotomy in a rodent model.

    Science.gov (United States)

    Yuan, Hao; Zhu, Xiaofang; Lu, Jingting; Dai, Jiewen; Fang, Bing; Shen, Steve G F

    2014-04-01

    In surgery-first accelerated orthognathic surgery, the clinical phenomenon of accelerated orthodontic tooth movement after osteotomy is a benefit compared with the conventional approach. However, because much of the literature on this phenomenon is based on empirical evidence and case reports, experimental animal-based studies are needed to verify and quantify this acceleration effect. The purpose of this prospective experimental study was to identify whether osteotomy procedures increase tooth movement. Le Fort I osteotomies were performed on the left maxillas in 15 male adult Sprague-Dawley rats. After surgery, a continuous force of 0.5 N was placed on the maxillary left first molar to move the tooth mesially. Another 15 rats had no surgery and served as controls. On days 1, 14, and 28, digital caliper measurements were taken to record tooth movement. In the experimental group, the maxillary left first molars moved significantly more rapidly on days 14 and 28 (P accelerated the rate of orthodontic tooth movement. Histologically, more active and extensive bone remodeling was observed after osteotomy. Copyright © 2014. Published by Elsevier Inc.

  15. Characterization plan for Fort St. Vrain and Peach Bottom graphite fuels

    Energy Technology Data Exchange (ETDEWEB)

    Maarschman, S.C.; Berting, F.M.; Clemmer, R.G.; Gilbert, E.R.; Guenther, R.J.; Morgan, W.C.; Sliva, P.

    1993-09-01

    Part of Fort St. Vrain (FSV) and most of the Peach Bottom (PB) reactor spent fuels are currently stored at INEL and may remain in storage for many years before disposal. Three disposal pathways have been proposed: intact disposal, fuels partially disassembled and the high-level waste fraction conditioned prior to disposal, and fuels completed disassembled and conditioned prior to disposal. Many options exist within each of these pathways. PNL evaluated the literature and other reference to develop a fuels characterization plan for these fuels. This plan provides guidance for the characteristics of the fuel which will be needed to pursue any of the storage or disposal pathways. It also provides a suggested fuels monitoring program for the current storage facilities. This report recommends a minimum of 7 fuel elements be characterized: PB Core 1 fuel: one Type II nonfailed element, one Type II failed element, and one Type III nonfailed element; PB Core 2 fuel: two Type II nonfailed fuel elements; and FSV fuel: at least two fuel blocks from regions of high temperature and fluence and long in-reactor performance (preferably at reactor end-of- life). Selection of PB fuel elements should focus on these between radial core position 8 and 14 and on compacts between compact numbers 10 and 20. Selection of FSV fuel elements should focus on these from Fuel Zones II and III, located in Core Layers 6, 7, and possibly 8.

  16. Reactivation of the Shock-Tunnel Facility at Fort Cronkhite. Final report

    International Nuclear Information System (INIS)

    1982-05-01

    This final report describes the results of work undertaken to reactivate the Shock Tunnel Facility at Battery Townsley, Fort Cronkhite, Marin County, California. The facility has been reactivated and can not be utilized for blast testing. The major emphasis will be testing of concepts pertaining to programs of interest to the Federal Emergency Management Agency (FEMA) and in particular to civil defense oriented research. However, a wide variety of testing requirements can be accommodated. For example, past programs at the facility have included: tests of debris from trees subjected to blast for Bell Telephone Laboratories; tests of the response of aluminum hull panels to blast loading and of the response of a model surface effects ship for the Naval Ship Research and Development center, and tests of the response of a radome prototype to blast loading conducted for ANCOM (the radome manufacturer). The Shock Tunnel Facility is located in a former coastal defense 16-inch gun emplacement constructed by the US Army beginning in 1938. It was converted in 1967 to serve as a facility for full-scale testing of the loading and response of structural elements and civil defense equipment. It remained in operation until November 1976 when Battery Townsley was turned over to the National Park Service. Work under the present purchase order consisted of the following major tasks: (I) cleanup and secure the facility, (II) reactivate the shock tunnel, and (III) design permanent facility improvements

  17. Cultural keystone species in oil sands reclamation, Fort McKay, Alberta, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Garibaldi, A.; Straker, J. [Stantec Consulting Ltd., Surrey, BC (Canada)

    2009-12-15

    This presentation discussed a reclamation project conducted in Fort McKay, Alberta that was designed to address some of the social and cultural concerns related to oil sands mining in the region. Conventional reclamation practices in the region have demonstrated a lack of communication and participation from surrounding communities. The project was designed to address future land use plans and to include cultural values in the reclamation process. An integrative approach was used to address community landscapes issues and to explore methods of reclaiming the social and ecological components impacted by oil sands development. Traditional environmental knowledge was also incorporated into the program's design. Cultural keystone species (CKS) were used to provide a culturally relevant compass to guide people engaging in long-term reclamation and land use planning. Cultural keystone species were defined as salient species that significantly shape the cultural identity of a people. Keystone species in the region include the beaver; the moose; the ratroot; and cranberries and blueberries. Challenges to the program included the fact that the scale of oil sands disturbances are so immense that some community recommendations for reclaiming CKS may be impractical. tabs., figs.

  18. Characterization plan for Fort St. Vrain and Peach Bottom graphite fuels

    International Nuclear Information System (INIS)

    Maarschman, S.C.; Berting, F.M.; Clemmer, R.G.; Gilbert, E.R.; Guenther, R.J.; Morgan, W.C.; Sliva, P.

    1993-09-01

    Part of Fort St. Vrain (FSV) and most of the Peach Bottom (PB) reactor spent fuels are currently stored at INEL and may remain in storage for many years before disposal. Three disposal pathways have been proposed: intact disposal, fuels partially disassembled and the high-level waste fraction conditioned prior to disposal, and fuels completed disassembled and conditioned prior to disposal. Many options exist within each of these pathways. PNL evaluated the literature and other reference to develop a fuels characterization plan for these fuels. This plan provides guidance for the characteristics of the fuel which will be needed to pursue any of the storage or disposal pathways. It also provides a suggested fuels monitoring program for the current storage facilities. This report recommends a minimum of 7 fuel elements be characterized: PB Core 1 fuel: one Type II nonfailed element, one Type II failed element, and one Type III nonfailed element; PB Core 2 fuel: two Type II nonfailed fuel elements; and FSV fuel: at least two fuel blocks from regions of high temperature and fluence and long in-reactor performance (preferably at reactor end-of- life). Selection of PB fuel elements should focus on these between radial core position 8 and 14 and on compacts between compact numbers 10 and 20. Selection of FSV fuel elements should focus on these from Fuel Zones II and III, located in Core Layers 6, 7, and possibly 8

  19. 8 CFR 100.4 - Field offices.

    Science.gov (United States)

    2010-01-01

    ..., ME Derby Line, VT Eastport, ME East Richford, VT Fort Fairfield, ME Fort Kent, ME Hamlin, ME Highgate... Falls, MT, Great Falls International Airport Havre, MT, Havre-Hill County Airport Helena, MT, Helena...

  20. Field Artillery and the Combined Arms Team: A Case for the Continued Relevance of American Fire Support

    Science.gov (United States)

    2015-05-23

    September-October 2003): 15; Philip D. Rice , “Decisive Fires, Decisive Victory: 1-9 FA in OIF,” Field Artillery Journal (September-October 2003): 30-31...Sill and the Golden Age of Field Artillery,” January 31, 1981, US Army Field Artillery School Archives, Morris Swett Technical Library, 10. 23 Ibid...Cambridge University Press, 2007. Gudmundsson, Bruce I. On Artillery. Westport: Praeger, 1993. Gugeler, Russell A. “Fort Sill and the Golden Age

  1. Effects of the Fort McMurray wildfires on the health of evacuated workers: follow-up of 2 cohorts.

    Science.gov (United States)

    Cherry, Nicola; Haynes, Whitney

    2017-08-15

    Wildfire engulfed Fort McMurray, Alberta on May 3, 2016, leading to a total evacuation. Access to 2 active cohorts allowed us to rapidly assess health effects in those evacuated. People working in Fort McMurray who had been recruited before the fire for 2 occupational health cohort studies completed a questionnaire (online or via telephone) 3-26 weeks after evacuation. The questionnaire asked about respiratory and mental health and experiences since the fire. Of the 129 participants, 109 were in the Fort McMurray area on May 3. Thirty-seven (33.9%) of the participants who were in Fort McMurray on May 3 reported a health condition, including respiratory symptoms ( n = 17) and mental ill health ( n = 17), immediately after the fire. At follow-up, a mean of 102 days after the fire, 11 participants (10.1%) reported a fire-related health condition, including mental ill health ( n = 8) and respiratory symptoms ( n = 2). There was no difference before and after the fire in use of alcohol, cigarettes, recreational drugs or medication. One in 4 participants (32 [24.6%]) had not worked since the fire, and fewer than half (58 [44.6%]) had returned to Fort McMurray. Of the 90 participants evacuated, 15 (16.7%) had scores indicative of moderate or severe anxiety or depression on the Hospital Anxiety and Depression Scale. Those evacuated had significantly higher mean anxiety ( p = 0.01) and depression ( p = 0.04) scores than those not evacuated. Regression modelling showed that anxiety scores were higher for women, with longer time since the fire and with evacuation to a motel. Depression scores were higher for women and with financial loss because of lack of work. Although evacuation was associated with higher anxiety and depression scores, persisting ill health was not widespread at early follow-up after the fire. Although these results are encouraging, these "healthy worker" results cannot be generalized to all evacuees. Copyright 2017, Joule Inc. or its licensors.

  2. "Closing the Loop": Overcoming barriers to locally sourcing food in Fort Collins, Colorado

    Science.gov (United States)

    DeMets, C. M.

    2012-12-01

    Environmental sustainability has become a focal point for many communities in recent years, and restaurants are seeking creative ways to become more sustainable. As many chefs realize, sourcing food locally is an important step towards sustainability and towards building a healthy, resilient community. Review of literature on sustainability in restaurants and the local food movement revealed that chefs face many barriers to sourcing their food locally, but that there are also many solutions for overcoming these barriers that chefs are in the early stages of exploring. Therefore, the purpose of this research is to identify barriers to local sourcing and investigate how some restaurants are working to overcome those barriers in the city of Fort Collins, Colorado. To do this, interviews were conducted with four subjects who guide purchasing decisions for restaurants in Fort Collins. Two of these restaurants have created successful solutions and are able to source most of their food locally. The other two are interested in and working towards sourcing locally but have not yet been able to overcome barriers, and therefore only source a few local items. Findings show that there are four barriers and nine solutions commonly identified by each of the subjects. The research found differences between those who source most of their food locally and those who have not made as much progress in local sourcing. Based on these results, two solution flowcharts were created, one for primary barriers and one for secondary barriers, for restaurants to assess where they are in the local food chain and how they can more successfully source food locally. As there are few explicit connections between this research question and climate change, it is important to consider the implicit connections that motivate and justify this research. The question of whether or not greenhouse gas emissions are lower for locally sourced food is a topic of much debate, and while there are major developments

  3. Fort Cobb Reservoir Watershed, Oklahoma and Thika River Watershed, Kenya Twinning Pilot Project

    Science.gov (United States)

    Moriasi, D.; Steiner, J.; Arnold, J.; Allen, P.; Dunbar, J.; Shisanya, C.; Gathenya, J.; Nyaoro, J.; Sang, J.

    2007-12-01

    The Fort Cobb Reservoir Watershed (FCRW) (830 km2) is a watershed within the HELP Washita Basin, located in Caddo and Washita Counties, OK. It is also a benchmark watershed under USDA's Conservation Effects Assessment Project, a national project to quantify environmental effects of USDA and other conservation programs. Population in south-western Oklahoma, in which FCRW is located, is sparse and decreasing. Agricultural focuses on commodity production (beef, wheat, and row crops) with high costs and low margins. Surface and groundwater resources supply public, domestic, and irrigation water. Fort Cobb Reservoir and contributing stream segments are listed on the Oklahoma 303(d) list as not meeting water quality standards based on sedimentation, trophic level of the lake associated with phosphorus loads, and nitrogen in some stream segments in some seasons. Preliminary results from a rapid geomorphic assessment results indicated that unstable stream channels dominate the stream networks and make a significant but unknown contribution to suspended-sediment loadings. Impairment of the lake for municipal water supply, recreation, and fish and wildlife are important factors in local economies. The Thika River Watershed (TRW) (867 km2) is located in central Kenya. Population in TRW is high and increasing, which has led to a poor land-population ratio with population densities ranging from 250 people/km2 to over 500 people/km2. The poor land-population ratio has resulted in land sub-division, fragmentation, over- cultivation, overgrazing, and deforestation which have serious implications on soil erosion, which poses a threat to both agricultural production and downstream reservoirs. Agricultural focuses mainly on subsistence and some cash crops (dairy cattle, corn, beans, coffee, floriculture and pineapple) farming. Surface and groundwater resources supply domestic, public, and hydroelectric power generation water. Thika River supplies 80% of the water for the city of

  4. High-resolution earthquake relocation in the Fort Worth and Permian Basins using regional seismic stations

    Science.gov (United States)

    Ogwari, P.; DeShon, H. R.; Hornbach, M.

    2017-12-01

    Post-2008 earthquake rate increases in the Central United States have been associated with large-scale subsurface disposal of waste-fluids from oil and gas operations. The beginning of various earthquake sequences in Fort Worth and Permian basins have occurred in the absence of seismic stations at local distances to record and accurately locate hypocenters. Most typically, the initial earthquakes have been located using regional seismic network stations (>100km epicentral distance) and using global 1D velocity models, which usually results in large location uncertainty, especially in depth, does not resolve magnitude filters and regional relative location when local data becomes available. We use the local distance data for high-resolution earthquake location, identifying earthquake templates and accurate source-station raypath velocities for the Pg and Lg phases at regional stations. A matched-filter analysis is then applied to seismograms recorded at US network stations and at adopted TA stations that record the earthquakes before and during the local network deployment period. Positive detections are declared based on manual review of associated with P and S arrivals on local stations. We apply hierarchical clustering to distinguish earthquakes that are both spatially clustered and spatially separated. Finally, we conduct relative earthquake and earthquake cluster location using regional station differential times. Initial analysis applied to the 2008-2009 DFW airport sequence in north Texas results in time continuous imaging of epicenters extending into 2014. Seventeen earthquakes in the USGS earthquake catalog scattered across a 10km2 area near DFW airport are relocated onto a single fault using these approaches. These techniques will also be applied toward imaging recent earthquakes in the Permian Basin near Pecos, TX.

  5. Basin-Scale Hydrogeological Modeling of the Fort Worth Basin Ellenburger Group for Pore Pressure Characterization

    Science.gov (United States)

    Gao, S.; Nicot, J. P.; Dommisse, R. D.; Hennings, P.

    2017-12-01

    The Ellenburger Group in the Fort Worth Basin, north-central Texas, is the major target for disposal of flowback and produced water originating from the overlying Barnett Shale gas play. Ellenburger formations of Ordovician age consist of karstic platform carbonates, often dolomitized, with locally high injection potential, and commonly directly overly the Precambrian crystalline basement at depths between6000 and 12,000 ft. In some places sandstones of Cambrian age lie in between the Ellenburger Group and basement. A few localities in or close to the core of the play have experienced seismic activity in the past decade. To better understand naturally occurring and potentially induced seismicity and the relationship to oil and gas operations, a larger team have constructed a 3D hydrogeological model of the Basin with all available well log data, stratigraphic data, petrophysical analysis of the injection intervals, faults from all possible sources including outcrops, controls on permeability anisotropy from outcrops and other data. The model is calibrated with the help of injection pressure constraints while honoring injection volume history through 100+ injection wells of the past decades. Major faults, including the east and north model boundaries, are implemented deterministically whereas fractures and minor faults, which considerably enhance the permeability of the carbonate system, are implemented stochastically and history-match the pressure data. This work in progress will ultimately provide basin-wide fluid budget analysis and pore pressure distribution in the Ellenburger formations. It will serve as a fundamental step to assess fault reactivation and basin-wide-seismogenic potential.

  6. Extracting the social relevance of artefact distribution in Roman military forts

    Directory of Open Access Journals (Sweden)

    Penelope M. Allison

    2005-04-01

    Full Text Available 'Engendering Roman Spaces' is a research project concerned with using artefact assemblage analyses to better understand spatial and gender relationships in the early Roman Empire and to produce more engendered perspectives of Roman society. This paper discusses the methodology and analyses being used in this project to investigate social behaviour within Roman military forts and fortresses of the 1st and 2nd centuries CE through analyses of the spatial distribution of artefacts at these sites. The processes involved include digitising previously published maps and artefact catalogues from Roman military sites to create searchable databases and GIS maps. They also include the classification of the artefacts according to a number of functional and gender-associated categories (e.g. combat equipment, male and female dress, toilet etc. so that the spatial distributions of the relevant activities can be plotted. This data is then used to interpret the spatial relationships of these activities and the people involved in them. The double legionary fortress of Vetera I, on the Lower Rhine, has been used to exemplify these processes. This fortress was excavated in the early 20th century and the artefacts were comprehensively published in 1995 (N. Hanel, Vetera I: Die Funde aus den römischen Lagern auf dem Fürstenberg bei Xanten. Rheinische Ausgrabungen 35, Rheinland-Verlag, Cologne and Dr Rudolf Halbert, Bonn, 1995. The paper includes descriptions of the methods and software employed in the digitisation of relevant material from these volumes, the formation of relational databases, and the importation of this data and of site maps into a GIS programme. To illustrate these processes and to present some of the results, the paper also includes a number of examples of the analyses carried out, together with interactive GIS maps of these analyses.

  7. Initial effects of light armored vehicle use on grassland vegetation at Fort Lewis, Washington.

    Science.gov (United States)

    Foster, Jeffrey R; Ayers, Paul D; Lombardi-Przybylowicz, Angela M; Simmons, Katie

    2006-12-01

    Sustainable use of military training lands requires understanding and prediction of the effects of military vehicles on vegetation. We examined the initial impacts of an 8-wheeled, light armored vehicle (LAV) on grassland vegetation at Fort Lewis, Washington. The LAV drove replicate spiral paths at two starting velocities, 10.3 and 5.1 m s(-1). The disturbed width (width of ground impacted by the tires) increased as turning radius decreased, but was unaffected by vehicle velocity. An inverse-exponential model predicted disturbed width (r(2)=0.68) at all turning radii for both velocities combined. In low-velocity spirals, and for straight tracking (turning radius>40 m) and moderate turns (radius 20-40 m) in high-velocity spirals, all vegetation damage was imprint (plants flattened by wheels). During sharp (radius moderate turns>sharp turns in high-velocity spirals. In low-velocity spirals, post-tracking cover of several plant growth forms (non-native species, perennial species, sod-forming grasses) was similar to pre-tracking cover, but in high-velocity spirals, post-tracking cover of these growth forms decreased in the order straight > or =moderate=sharp. Cover of native species and forbs decreased more in high- than in low-velocity spirals, but was unaffected by curvature. Pre- and post-tracking cover of annual species, bunchgrasses, and shrubs was < or =3%. The most severe vegetation damage caused by operation of wheeled LAVs on grasslands is associated with sharp, high-velocity turns.

  8. Phytosociological attributes of plant biodiversity of the Fort Ranikot and adjoining area (Kirthar range)

    International Nuclear Information System (INIS)

    Ishtiaq, M.; Perveen, A.

    2015-01-01

    The plant biodiversity, floristic composition and phytosociological attributes of the vascular plants of Fort Ranikot were analyzed. A total of 107 taxa were collected belonging to 41 families and 78 genera. The largest family was Poaceae containing 9 taxa, while the other major families were Papilionaceae with 6 species; Asclepiadaceae, Mimosaceae, and Solanaceae comprising of 5 species each respectively. Majority of the taxa are common throughout the study area, however, 6 species Viz. Aristolochia bracteolata, Physorrhynchus brahuicus, Plantago ciliata, Polygala erioptera, Salvadora persica and Viola stocksii were found to be very rare. The flora is dominated by Chamaephyte, followed by Therophytes, Phanerophytes, Hemicryptophytes and climbers. The aim of the present study is to provide comprehensive inventory of the study area along with its phytosociology and ecological parameters. Collectively on the basis of important value index six plants communities were recognized from different sites of the study area. The study area was categorized into six ecological sites on the basis of microclimatic conditions and topography. For comparison in these sites similarity index, beta diversity, diversity index, species evenness and maturity index was also calculated. The soil texture classes varied from loam to sandy loam and slit loam with pH of 7.78-8.24, electrical conductivity varied from 687-827 EC micro S/cm, Total dissolved salts varied from 0.36-0.71 mg-1, CaCO/sub 3/ varied from 3.48-4.21% and organic matter varied from 0.39-1.24%. Present study predict that there are certain edaphic factors, altitudinal variation, soil texture and amount of organic matter which are responsible for variation in vegetation. (author)

  9. The use of Le Fort I Approach in the resection of an extensive ossifying fibroma.

    Science.gov (United States)

    Studart Soares, Eduardo Costa; de Medeiros, José Rômulo; Bezerra, Tácio Pinheiro; Nogueira, Carlos Bruno Pinheiro; Costa, Fábio Wildson Gurgel; Nogueira, Alexandre Simões

    2013-09-01

    Ossifying fibroma (OF) is a well-defined benign neoplasm characterized by slow growth and predilection for the posterior mandible site, usually treated by conservative surgical approaches. In this context, Le Fort I Approach (LFIA) has been increasingly used providing good visualization and an easy access to the lesion. It also allows removal of the lesion quickly. Although there are case reports using LFIA for the management of benign neoplasms, odontogenic cysts and tumors of the middle third of face, to our knowledge, only one article describes the use of surgical LFIA for OF of the maxilla. Thus, the objective of this study was to report the second paper on the use of horizontal osteotomy of the maxilla in the resection of an extensive OF and conduct a brief literature review on this surgical approach. The following case report describes a 33-year-old man who was diagnosed with OF. Oral examination showed a painless swelling of hard consistency, covered by normal mucosa in edentulous alveolar ridge of the maxillary posterior region of the right side. Tomographic slices revealed that the image with mixed density had a centrifugal growth, with expansion of the buccal and lingual cortical with an upper displacement of the maxillary sinus. The patient was admitted to the hospital for surgical resection of the lesion via LFIA. Satisfactory functional results were obtained after 18-month follow-up period. In addition, no recurrence or clinical complaints were noted. LFIA shall be considered as a feasible option when planning surgery for removal of extensive benign lesions located in midfacial region because it is a predictable technique and routinely performed by the oral and maxillo-facial surgeons.

  10. Long-term sodium and chloride surface water exports from the Dallas/Fort Worth region.

    Science.gov (United States)

    Steele, M K; Aitkenhead-Peterson, J A

    2011-07-15

    Sodium and chloride in surface water are typically related to urbanization and population density and can have a significant impact on drinking water sources and the subsequent salinity of aquatic ecosystems. While the majority of research has focused on the impact of deicing salts on urban surface waters in colder climates, the effect of urbanization on sodium and chloride concentrations has been found to occur in warmer climates. This study investigated long-term exports of sodium and chloride from watersheds with increasing urbanization in the humid subtropical Dallas-Fort Worth region. We compared exports to characteristics of urbanization: urban land cover, impervious surface area, and calculated contributions from wastewater discharges. Long-term data (1980-2008) were obtained from five USGS gages located in and around the cities. Exports were calculated by regression analysis between concentrations and discharge and normalized for time and the watershed area. Grab samples were collected from June 2009 to May 2010 and sodium and chloride concentrations quantified. Our results show a strong positive relationship between the mean annual sodium and chloride exports from each watershed and the percent urban land cover and impervious surface area. Long-term increases in sodium and chloride fluxes were found for the three watersheds with the highest percentage of urban land cover. The single largest contributor was wastewater effluent that was estimated to contribute approximately half of the total loads in the three urbanized watersheds. Atmospheric deposition and deicing salts accounted for small amounts of the total export for urbanized watersheds. The source of the remaining salt load is still unknown and may be a combination of non-point sources. Estimates of urban salt exports were similar to estimates from northern watersheds affected by deicing salts. Copyright © 2011 Elsevier B.V. All rights reserved.

  11. Stress Drop Estimates from Induced Seismic Events in the Fort Worth Basin, Texas

    Science.gov (United States)

    Jeong, S. J.; Stump, B. W.; DeShon, H. R.

    2017-12-01

    Since the beginning of Barnett shale oil and gas production in the Fort Worth Basin, there have been earthquake sequences, including multiple magnitude 3.0+ events near the DFW International Airport, Azle, Irving-Dallas, and throughout Johnson County (Cleburne and Venus). These shallow depth earthquakes (2 to 8 km) have not exceeded magnitude 4.0 and have been widely felt; the close proximity of these earthquakes to a large population center motivates an assessment of the kinematics of the events in order to provide more accurate ground motion predictions. Previous studies have estimated average stress drops for the DFW airport and Cleburne earthquakes at 10 and 43 bars, respectively. Here, we calculate stress drops for Azle, Irving-Dallas and Venus earthquakes using seismic data from local (≤25 km) and regional (>25 km) seismic networks. Events with magnitudes above 2.5 are chosen to ensure adequate signal-to-noise. Stress drops are estimated by fitting the Brune earthquake model to the observed source spectrum with correction for propagation path effects and a local site effect using a high-frequency decay parameter, κ, estimated from acceleration spectrum. We find that regional average stress drops are similar to those estimated using local data, supporting the appropriateness of the propagation path and site corrections. The average stress drop estimates are 72 bars, which range from 7 to 240 bars. The results are consistent with global averages of 10 to 100 bars for intra-plate earthquakes and compatible with stress drops of DFW airport and Cleburne earthquakes. The stress drops show a slight breakdown in self-similarity with increasing moment magnitude. The breakdown of similarity for these events requires further study because of the limited magnitude range of the data. These results suggest that strong motions and seismic hazard from an injection-induced earthquake can be expected to be similar to those for tectonic events taking into account the shallow

  12. Chemistry, toxicology, and persistence of particulates during and after the 2016 Fort McMurray Wildfires in Alberta, Canada

    Science.gov (United States)

    Kohl, L.; Chan, A. W. H.; Cooke, C. A.; Hustins, S.; Jackson, B.; Wang, S.; Jing, X.; Meng, M.

    2017-12-01

    The Horse River Fire in May 2016 forced the evacuation of 88,000 Fort McMurray residents, and led to the destruction of over 2000 houses. After re-entry to homes, there is significant concern about exposures to residual fire-derived contaminants in residential houses. Wildfire research, however, provides little guidance on how long ashes and pollutants persist in household dust after major fires. The FACET project studies the chemistry and toxicology of samples of urban and forest ashes and airborne particles collected during the fire, as well as over 500 house dust samples collected in July 2017 (14 months after the fire). Here we present results on the chemical composition of the urban and forest ash samples collected during the fire along with initial results from house dust samples. Wildfire ashes contained elevated concentrations of polycyclic aromatic hydrocarbons (PAH), heavy metals, and dioxin like compounds (DLC). Relative to EPA reference doses, As and Sb constitute the greatest non-carcinogenic health hazard, whereas PAHs Benzo(a)pyrene and Indeno(1,2,3-cd)pyrene are the most relevant carcinogens. Ashes from urban locations contained higher concentrations of heavy metals and DLC than samples collected from forested areas outside of the City of Fort McMurray. Urban samples furthermore had a greater potential for generating oxidative stress than rural samples, as determined by dithiothreitol (DTT) consumption assays. The oxidative potential was positively correlated to Al, Cu, As, and V concentrations. Airborne particulate matter samples from the smoke plume contained consistent concentrations of levoglucosan (99 ± 5 mg g-1), along with other tracers for biomass burning (free lignin monomers, retene). Together these results will serve as proxies for understanding the contribution and the persistence of fire-derived pollutants in house dust in Fort McMurray homes.

  13. Effectiveness of adenoplex forte with or without heparegene as radioprotective and curative agent for controlling radiation induced hepatic metabolic dysfunction

    International Nuclear Information System (INIS)

    Mohamed, S.H.; EL-Sayed, N.M.; Hussein, A.M.

    2004-01-01

    The present work aims to evaluate the combined radioprotective and curative capacities of a known drug namely adenoplex forte [combination of adenosine tetraphosphate (ATP), co carboxylase, cyanocobalamin (Bn) and nicotinamide (vitamin P.P)] in dependency or in combination with heparegen [thiazolidine 4 -carboxylic acid] on liver metabolic processes of rats irradiated at 5 Gy. Therefore, the levels of plasma total lipids, triglycerides, total cholesterol, HDL-cholesterol and LDL-cholesterol were estimated as indicative parameters for lipid metabolism. Estimations of plasma glucose, pyruvate and lactate levels as well as liver glycogen content were employed as a useful means for testing the carbohydrate metabolism. The tested parameters were undertaken on 3, 7, 14, 21 and 30 days post-radiation exposure of rats to 5 Gy. Data of the present study revealed that exposure of rats to gamma irradiation at a dose level of 5 Gy was associated with disturbances in liver metabolic functions as reflected by alterations observed in all the tested parameters of both lipid and carbohydrate metabolism up to 30 days post-irradiation. The data further indicated that appropriate use of the selected drug adenoplex forte either independently or in combination with heparegen can preferentially modify liver metabolic disturbances induced by radiation exposure, which creates a therapeutic advantage in radiation therapy. In conclusion, this study suggest the potential use of adenoplex forte (with dose of 290 mg/kg) in combination with heparegen (with dose of 2 mg/kg) in patients receiving radiotherapy and suffering disturbed liver metabolic function mainly in carbohydrate and lipid metabolism

  14. New interpretations of the Fort Clark State Historic Site based on aerial color and thermal infrared imagery

    Science.gov (United States)

    Heller, Andrew Roland

    The Fort Clark State Historic Site (32ME2) is a well known site on the upper Missouri River, North Dakota. The site was the location of two Euroamerican trading posts and a large Mandan-Arikara earthlodge village. In 2004, Dr. Kenneth L. Kvamme and Dr. Tommy Hailey surveyed the site using aerial color and thermal infrared imagery collected from a powered parachute. Individual images were stitched together into large image mosaics and registered to Wood's 1993 interpretive map of the site using Adobe Photoshop. The analysis of those image mosaics resulted in the identification of more than 1,500 archaeological features, including as many as 124 earthlodges.

  15. Medskabelse og inklusion på et museum - fortællinger om hvordan et sted i forstaden bliver til

    Directory of Open Access Journals (Sweden)

    Kirsten Egholk

    2016-07-01

    Full Text Available Det kulturhistoriske museums samarbejde, inklusion og medskabelse med så bred en vifte af borgere som muligt er et centralt fokus på museerne i det 21. århundrede. Artiklen giver eksempler på et museums metoder til forskellige former for inddragelse af borgerne som eksempelvis medkuratorer og medproducenter af kulturhistoriske udstillinger. Udgangspunktet er Greve Museums arbejde med at forske i, indsamle og formidle forstadens liv og kulturhistorie i perioden fra 1960'erne og frem til nyeste tid og hvordan fortællinger om et sted skabes i en dialog med mange forskellige interessenter.

  16. Geologic framework of the Mississippian Barnett Shale, Barnett-Paleozoic total petroleum system, Bend arch-Fort Worth Basin, Texas

    Science.gov (United States)

    Pollastro, R.M.; Jarvie, D.M.; Hill, R.J.; Adams, C.W.

    2007-01-01

    This article describes the primary geologic characteristics and criteria of the Barnett Shale and Barnett-Paleozoic total petroleum system (TPS) of the Fort Worth Basin used to define two geographic areas of the Barnett Shale for petroleum resource assessment. From these two areas, referred to as "assessment units," the U.S. Geological Survey estimated a mean volume of about 26 tcf of undiscovered, technically recoverable hydrocarbon gas in the Barnett Shale. The Mississippian Barnett Shale is the primary source rock for oil and gas produced from Paleozoic reservoir rocks in the Bend arch-Fort Worth Basin area and is also one of the most significant gas-producing formations in Texas. Subsurface mapping from well logs and commercial databases and petroleum geochemistry demonstrate that the Barnett Shale is organic rich and thermally mature for hydrocarbon generation over most of the Bend arch-Fort Worth Basin area. In the northeastern and structurally deepest part of the Fort Worth Basin adjacent to the Muenster arch, the formation is more than 1000 ft (305 m) thick and interbedded with thick limestone units; westward, it thins rapidly over the Mississippian Chappel shelf to only a few tens of feet. The Barnett-Paleozoic TPS is identified where thermally mature Barnett Shale has generated large volumes of hydrocarbons and is (1) contained within the Barnett Shale unconventional continuous accumulation and (2) expelled and distributed among numerous conventional clastic- and carbonate-rock reservoirs of Paleozoic age. Vitrinite reflectance (Ro) measurements show little correlation with present-day burial depth. Contours of equal Ro values measured from Barnett Shale and typing of produced hydrocarbons indicate significant uplift and erosion. Furthermore, the thermal history of the formation was enhanced by hydrothermal events along the Ouachita thrust front and Mineral Wells-Newark East fault system. Stratigraphy and thermal maturity define two gas

  17. Airborne electromagnetic and magnetic geophysical survey data of the Yukon Flats and Fort Wainwright areas, central Alaska, June 2010

    Science.gov (United States)

    Ball, Lyndsay B.; Smith, Bruce D.; Minsley, Burke J.; Abraham, Jared D.; Voss, Clifford I.; Astley, Beth N.; Deszcz-Pan, Maria; Cannia, James C.

    2011-01-01

    In June 2010, the U.S. Geological Survey conducted airborne electromagnetic and magnetic surveys of the Yukon Flats and Fort Wainwright study areas in central Alaska. These data were collected to estimate the three-dimensional distribution of permafrost at the time of the survey. These data were also collected to evaluate the effectiveness of these geophysical methods at mapping permafrost geometry and to better define the physical properties of the subsurface in discontinuous permafrost areas. This report releases digital data associated with these surveys. Inverted resistivity depth sections are also provided in this data release, and data processing and inversion methods are discussed.

  18. Primary invasive carcinoma of the vagina after Le Fort partial colpocleisis for stage IV pelvic organ prolapse: a case report.

    Science.gov (United States)

    Cho, Moon Kyoung; Kim, Chul Hong; Kim, Yoon Ha

    2011-11-01

    We present here the case report of a postmenopausal woman who complained of recurrent pus-like vaginal discharge and perianal pain 1 year after Le Fort colpocleisis, which was subsequently identified as a primary invasive carcinoma of the vagina. Biopsy confirmed a squamous cell carcinoma in the vagina, and the disease was classified as stage III according to FIGO staging. The patient received pelvic radiotherapy. This case emphasizes that differential diagnosis of recurrent vaginal discharge that presents remote from obliterative procedure for pelvic organ prolapse should consider not only pyometra, but also other causes.

  19. Livolin Forte Ameliorates Cadmium-Induced Kidney Injury in Wistar Rats

    Directory of Open Access Journals (Sweden)

    Akomolafe Rufus O.

    2016-06-01

    Full Text Available The kidney, which is an integral part of the drug excretion system, was reported as one of the targets of cadmium toxicity. Early events of cadmium toxicity in the cell include a decrease in cell membrane fluidity, breakdown of its integrity, and impairment of its repair mechanisms. Phosphatidylcholine and vitamin E have a marked fluidizing effect on cellular membranes. We hypothesized that Livolin forte (LIV could attenuate kidney damage induced by cadmium in rats. Twenty-five adult male Wistar rats were divided into five groups of five rats each: group I (control group received 0.3 ml/kg/day of propylene glycol for six weeks; group II was given 5 mg/kg/day of cadmium (Cd i.p for 5 consecutive days; group III rats were treated in a similar way as group II but were allowed a recovery period of 4 weeks; group IV was treated with LIV (5.2 mg/kg/day for a period of 4 weeks after inducing renal injury with Cd similarly to group II; and group V was allowed a recovery period of 2 weeks after a 4-week LIV treatment (5.2 mg/kg/day following Cd administration. A significant increase in plasma creatinine, urea, uric acid, and TBARS were observed in groups II and III compared to the control rats. Significant reductions in total protein, glucose, and GSH activity were also recorded. The urine concentrations of creatinine, urea, and uric acid in groups II and III were significantly lower than the control group. Th is finding was accompanied by a significant decrease in creatinine and urea clearance. Post-treatment with LIV caused significant decreases in plasma creatinine, urea, uric acid, and TBARS. Significant increases in total protein, glucose, and GSH activity of groups IV and V were observed compared to group II. A significant increase in urine concentrations of creatinine, urea, and uric acid and significant decreases in total protein, glucose, and GSH activity were observed in groups IV and V compared to group II. Photomicrographs of the rat kidneys

  20. Visual field

    Science.gov (United States)

    Perimetry; Tangent screen exam; Automated perimetry exam; Goldmann visual field exam; Humphrey visual field exam ... Confrontation visual field exam. This is a quick and basic check of the visual field. The health care provider ...

  1. Still Fort McMoney : Wood Buffalo sees the opportunity to catch up on dire infrastructure needs in tough times

    Energy Technology Data Exchange (ETDEWEB)

    Gandia, R.

    2009-04-15

    While the recent economic downturn has resulted in some layoffs at worksites, residents of the Regional Municipality of Wood Buffalo have not been noticeably affected by the recession. The layoffs have occurred primarily among contractors flown in from the Atlantic provinces or from abroad. Despite this, Fort McMurray still has a higher population than its current infrastructure can provide services for. Oil sands operation-related workers are not likely to be affected by the recession. Large companies continue to recruit potential employees in eastern Canada. Local businesses in Fort McMurray have not seen reductions in consumer spending. A $220 million water and waste treatment plant will soon be completed and other construction projects include new housing developments, expansions to the municipal airport, and a new arena. House prices have fallen, and builders in the region are now facing stronger competition from the resale market. Health service facilities in the region are also expanding as the city's population continues to grow. 2 figs.

  2. Assessment of Soil-Gas and Soil Contamination at the Former Military Police Range, Fort Gordon, Georgia, 2009-2010

    Science.gov (United States)

    Falls, W. Fred; Caldwell, Andral W.; Guimaraes, Wladmir B.; Ratliff, W. Hagan; Wellborn, John B.; Landmeyer, James E.

    2011-01-01

    Soil gas and soil were assessed for organic and inorganic contaminants at the former military police range at Fort Gordon, Georgia, from May to September 2010. The assessment evaluated organic contaminants in soil-gas samplers and inorganic contaminants in soil samples. This assessment was conducted to provide environmental contamination data to Fort Gordon pursuant to requirements of the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process. Soil-gas samplers deployed and collected from May 20 to 24, 2010, identified masses above method detection level for total petroleum hydrocarbons, gasoline-related and diesel-related compounds, and chloroform. Most of these detections were in the southwestern quarter of the study area and adjacent to the road on the eastern boundary of the site. Nine of the 11 chloroform detections were in the southern half of the study area. One soil-gas sampler deployed adjacent to the road on the southern boundary of the site detected a mass of tetrachloroethene greater than, but close to, the method detection level of 0.02 microgram. For soil-gas samplers deployed and collected from September 15 to 22, 2010, none of the selected organic compounds classified as chemical agents and explosives were detected above method detection levels. Inorganic concentrations in the five soil samples collected at the site did not exceed the U.S. Environmental Protection Agency regional screening levels for industrial soil and were at or below background levels for similar rocks and strata in South Carolina.

  3. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 282 Renewable Energy Opportunities at Fort Gordon, Georgia

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Brian K.; Gorrissen, Willy J.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Williamson, Jennifer L.; Nesse, Ronald J.

    2010-09-30

    This document provides an overview of renewable resource potential at Fort Gordon, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the American Recovery and Reinvestment Act (ARRA) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Gordon took place on March 9, 2010.

  4. Parametric study of the low-enriched uranium integrated Fort-Saint-Vrain element; comparative evaluation with the interacting tubular element

    International Nuclear Information System (INIS)

    Cerles, J.M.; Carvallo, G.; Vallepin, C.

    1971-11-01

    This paper presents a study of the influence of the different geometric and neutronic parameters on the calculation of the cycle with low-enriched uranium in a Fort-Saint-Vrain type brick. The study is divided in two parts: a stage of physics, essentially neutronics; an economical part where the costs are taken into account. At the level of studies of neutronics and costs, a parallel comparison is developed between the brick Fort-Saint-Vrain and the interacting tubular element, and even thorium. 6 refs. 29 figs [fr

  5. Assessment of soil-gas, seep, and soil contamination at the North Range Road Landfill, Fort Gordon, Georgia, 2008-2009

    Science.gov (United States)

    Landmeyer, James E.; Falls, W. Fred; Ratliff, W. Hagan; Wellborn, John B.

    2011-01-01

    Soil gas, seeps, and soil were assessed for contaminants at the North Range Road Landfill at Fort Gordon, Georgia, from October 2008 to September 2009. The assessment included delineating organic contaminants present in soil-gas samples beneath the area estimated to be the landfill and in water samples collected from three seeps at the base of the landfill. Inorganic contaminants were determined in three seep samples and in soil samples. This assessment was conducted to provide environmental contamination data to Fort Gordon pursuant to requirements for the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process.

  6. High-Efficiency Housing at the Fort Peck Indian Reservation: Opportunities and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Lisell, Lars J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Desai, Jal D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dean, Jesse D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Rehder, Tim [U.S. Environmental Protection Agency (EPA), Region 8

    2018-03-13

    This project was initiated to provide design assistance in an effort to maximize energy performance for affordable housing at the Fort Peck Indian Reservation near Poplar, Montana. The Make It Right Foundation (MIRF) built 20 high performing homes (LEED Platinum) in 2015 and 2016 with three (3) different design options. NREL and EPA set out to provide energy analysis along with measurement and verification (M and V) of the homes to characterize energy use and provide clarity for future decision making with regard to tribal housing options. The results included herein summarize the energy end uses and documents projected energy impacts from various aspects of the MIRF home designs and construction. This report includes an analysis of energy use in 5 MIRF homes, comparing energy use across the different styles and configurations. Energy models were created for the 2 styles of MIRF homes, including renewable energy assessment for photovoltaic (PV) systems. Existing tribal housing has also been analyzed, with 5 housing units being analyzed for energy use and an energy model being created for 1 housing unit. The findings of this study highlight many of the challenges that arise when attempting to construct high performance housing in a region where such construction practices are still relatively rare. Homes in Poplar are well designed and, for the most part, and include climate specific design considerations appropriate for northeastern Montana. The most significant issues identified in MIRF homes were related to the work done to put the homes on the foundation, insulate the crawlspaces, and do final connection with the utilities. The Taxed II Credit homes are well designed and well suited to northeastern Montana, and with slight modifications to the design and construction could be very efficient. All occupant comfort and energy usage issues that were identified during the site visits can be remedied through retrofit measures that are relatively inexpensive. Energy

  7. Integrated geophysical investigations of linkages between Precambrian basement and sedimentary structures in the Ucayali basin, Peru; Fort Worth basin, Texas; and Osage County, Oklahoma

    Science.gov (United States)

    Elebiju, Olubunmi Olumide

    I conducted integrated geophysical studies within the Fort Worth basin, Texas; Osage County, Oklahoma, and the Ucayali basin, Peru. My studies are directed at understanding the relationships or links between Precambrian basement structures and sedimentary structures using these three areas as case studies. Links between basement structure, hydrocarbon reservoirs, and sedimentary sequences are not a new concept. Such relationships have been documented in the Paradox, Hardeman, Anadarko, Arkoma, Ardmore and Williston basins among others. Structures such as fault zones that can influence the formation of sedimentary basins and mineral deposits are often formed by intraplate tectonism. In order to compare the relationship between the Precambrian basement structures and sedimentary structures, I analyzed series of derivative and filtered maps of aeromagnetic and gravity data, which enhance basement structures, that were integrated with seismic data and seismic attribute data that enhance structures within the sedimentary sections. Other information such as well data and geologic information etc were also integrated. This integrated workflow facilitates the comparison of the links or relationships between the two structures. The results of the Fort Worth basin are presented in Chapter 3. The results of this integrated study show that the sedimentary structures within the study area are mainly related to basement structures because these structures are aligned parallel to anomalies identified on the high-resolution aeromagnetic (HRAM) data. The northeast-southwest and northwest-southeast orientations of sedimentary features are consistently parallel with Precambrian structural fabrics that are associated with structures such as the northeast trending Ouachita orogenic belt and the northwest trending Muenster Arch, which reactivated a late Cambrian/Late Precambrian faults. The knowledge gained in this study will impact oil and gas exploration and development within the

  8. Qualidade de caqui 'Rama forte' após armazenamento refrigerado, influenciada pelos tratamentos 1-MCP e/ou CO2 Quality of 'Rama Forte' perssimon following cold torage influenced by 1-MCP and/or CO2treatments

    Directory of Open Access Journals (Sweden)

    João Peterson Pereira Gardin

    2012-12-01

    Full Text Available Avaliaram-se os efeitos dos tratamentos com CO2 e 1-MCP (1-metilciclopropeno sobre a adstringência (índice de tanino, firmeza da polpa e distúrbios da epiderme em caqui 'Rama Forte'. Frutos foram tratados com 1-MCP por 24 h, logo após a colheita e/ou com alto CO2 (70% por 24 ou 48 h, um dia após a colheita ou após o armazenamento refrigerado (AR. Os caquis foram armazenados sob atmosfera modificada a 0 ºC, por 45 dias, e a seguir mantidos a 23 ºC, por 9 dias. Frutos-controle (não tratados com 1-MCP nem com CO2 amoleceram em três dias e perderam aproximadamente 50% da adstringência em 6 dias após o AR. A exposição ao CO2 acelerou a redução da adstringência. Esse efeito do CO2 foi menor em frutos tratados com 1-MCP, especialmente quando o CO2 foi aplicado após o AR, por apenas 24 h. O tratamento com 1-MCP inibiu o amolecimento e a redução da adstringência, especialmente nos frutos não tratados com CO2. O amolecimento de frutos tratados com 1-MCP foi maior quando a exposição ao CO2 ocorreu antes do AR. A combinação dos tratamentos com 1-MCP e alto CO2 reduziu a incidência de podridões e manchas translúcidas, mas não alterou o desenvolvimento de pintas pretas ('estrias'. Os resultados indicam que é possível induzir perda da adstringência sem excessiva perda da firmeza da polpa de caquis 'Rama Forte' após o AR pela associação dos tratamentos com 1-MCP logo após a colheita e alto CO2 após o AR.This study evaluated the effects of CO2 and 1-MCP (1-methylcyclopropene treatments on astringency (tannin index, flesh firmness and skin disorders on 'Rama Forte' persimmon. Fruit were treated with 1-MCP for 24 h right after harvest and/or with high CO2 (70% CO2 balanced with air for 24 or 48 h, one day after harvest or after cold storage (CS. Fruit were stored in modified atmosphere for 45 days at 0ºC and then held at 23ºC for 9 days. Control fruit (untreated with neither 1-MCP nor CO2 softened in 3 days and lost about 50

  9. 78 FR 2657 - Foreign-Trade Zone 196-Fort Worth, TX, Foreign-Trade Subzone 196A-TTI, Inc.; Application for...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [S-2-2013] Foreign-Trade Zone 196--Fort Worth, TX, Foreign-Trade Subzone 196A--TTI, Inc.; Application for Additional Subzone Site An application has been submitted to the Foreign-Trade Zones Board (the Board) by Alliance Corridor, Inc., grantee of FTZ 196...

  10. Tourism, Tolerance, or Hospitality? An Assessment of a Native/Non-Native, Urban/Rural Youth Exchange Program between Fort Good Hope, NWT, and East Vancouver, BC

    Science.gov (United States)

    Hern, Matt

    2009-01-01

    This article considers and assesses a youth exchange project between two community-based youth centers: The Purple Thistle Centre in East Vancouver, British Columbia, and the K'asho Got'ine Youth Centre in Fort Good Hope, Northwest Territories. Both centers serve primarily low-income youth, but after that the similarities are very few. The…

  11. The impact of the 2016 Fort McMurray Horse River Wildfire on ambient air pollution levels in the Athabasca Oil Sands Region, Alberta, Canada

    Science.gov (United States)

    An unprecedented wildfire impacted the northern Alberta city of Fort McMurray in May 2016 causing a mandatory city wide evacuation and the loss of 2,400 homes and commercial structures. A two-hectare wildfire was discovered on May 1, grew to ~ 157,000 ha by May 5, and continued t...

  12. Atividade antioxidante e antimicrobiana in vitro de extratos de caqui (Diospyros kaki L. cultivar Rama Forte In vitro antioxidant and antimicrobial properties of persimmon (Diospyros kaki L. cv. Rama Forte extracts

    Directory of Open Access Journals (Sweden)

    Liana Inês Guidolin Milani

    2012-06-01

    Full Text Available Atualmente, as atividades antioxidante e antimicrobiana de vários compostos fenólicos e de extratos de plantas têm sido avaliadas em muitos experimentos. O objetivo deste estudo foi elaborar o extrato hidroetanólico bruto de caqui (Diospyros kaki L. cultivar Rama Forte e fracioná-lo empregando solventes com diferentes polaridades, para posteriormente determinar os compostos fenólicos totais e verificar as atividades antioxidante e antimicrobiana in vitro tanto do extrato hidroetanólico bruto de caqui como das frações hexânica, clorofórmica, de acetato de etila e da fração residual, obtidas a partir do mesmo. Os compostos fenólicos totais foram determinados pelo método de Folin-Ciocalteu; a atividade antioxidante, por meio do método da captura do radical livre 2,2-difenil-1-picrilidrazila (DPPH, e a atividade antimicrobiana pelo método de difusão em disco. O teor de compostos fenólicos do extrato hidroetanólico bruto de caqui, da fração residual, da fração acetato de etila, da fração hexânica e da fração clorofórmica foram de 1.277,94, 1.231,23, 37,24, 17,60 e 11,48 mg GAE.100 mL-1, respectivamente. O extrato hidroetanólico bruto de caqui e a fração residual apresentaram maior teor de compostos fenólicos e maior atividade antirradical frente ao DPPH do que as demais frações testadas, com valores de IC50 de 0,2467 e 0,2567 mg.mL-1, respectivamente. O extrato de caqui e as frações não apresentaram atividade antimicrobiana in vitro sobre os microrganismos testados. Os resultados demonstraram que o extrato hidroetanólico bruto de caqui cv. Rama Forte e a fração residual contêm quantidade suficiente de compostos fenólicos capaz de contribuir positivamente na atividade antioxidante.The antioxidant and antimicrobial properties of various phenolic compounds and plant extracts have been evaluated in many experiments. The aim of this study was to obtain a crude hydroethanolic extract of persimmon (Diospyros kaki

  13. Phase Field

    Science.gov (United States)

    Koyama, Toshiyuki

    The term phase field has recently become known across many fields of materials science. The meaning of phase field is the spatial and temporal order parameter field defined in a continuum-diffused interface model. By using the phase field order parameters, many types of complex microstructure changes observed in materials science are described effectively. This methodology has been referred to as the phase field method, phase field simulation, phase field modeling, phase field approach, etc. In this chapter, the basic concept and theoretical background for the phase field approach is explained in Sects. 21.1 and 21.2. The overview of recent applications of the phase field method is demonstrated in Sects. 21.3 to 21.6.

  14. Origin of the late Quaternary dune fields of northeastern Colorado

    Science.gov (United States)

    Muhs, Daniel R.; Stafford, Thomas W.; Cowherd, Scott D.; Mahan, Shannon A.; Kihl, Rolf; Maat, Paula B.; Bush, Charles A.; Nehring, Jennifer

    1996-09-01

    Stabilized eolian deposits, mostly parabolic dunes and sand sheets, cover much of the landscape of northeastern Colorado and adjacent parts of southwestern Nebraska in four geographically distinct dune fields. Stratigraphic and soil-geomorphic relations and accelerator radiocarbon dating indicate that at least three episodes of eolian sand movement occurred between 27 ka and 11 ka, possibly between 11 ka and 4 ka, and within the past 1.5 ka. Thus, eolian sand deposition took place under both glacial and interglacial climatic conditions. In the youngest episodes of eolian sand movement, Holocene parabolic dunes partially buried Pleistocene sand sheet deposits. Late Holocene sands in the Fort Morgan and Wray dune fields, to the south of the South Platte River, have trace element ratios that are indistinguishable from modern South Platte River sands, but different from Ogallala Formation bedrock, which has previously been cited as the main source of dune sand on the Great Plains. Sands in the Greeley dune field, to the north of the South Platte River, have trace element concentrations that indicate a probable Laramie Formation source. Measurements of parabolic dunes indicate paleowinds from the northwest in all dune fields, in good agreement with resultant drift directions calculated for nearby weather stations. Thus, paleowinds were probably not significantly different from present-day winds, and are consistent with a South Platte River source for the Fort Morgan and Wray dune fields, and a Laramie Formation source for the Greeley dune field. Sand accumulated downwind of the South Platte River to form the Fort Morgan duen field. In addition, sand was also transported farther downwind over the upland formed by the calcrete caprock of the Ogallala Formation, and deposited in the lee of the upland on the southeast side. Because of high wind energy, the upland itself served as a zone of sand transport, but little or no sand accumulation took place on this surface. These

  15. Origin of the late quaternary dune fields of northeastern Colorado

    Science.gov (United States)

    Muhs, D.R.; Stafford, T.W.; Cowherd, S.D.; Mahan, S.A.; Kihl, R.; Maat, P.B.; Bush, C.A.; Nehring, J.

    1996-01-01

    Stabilized eolian deposits, mostly parabolic dunes and sand sheets, cover much of the landscape of northeastern Colorado and adjacent parts of southwestern Nebraska in four geographically distinct dune fields. Stratigraphic and soil-geomorphic relations and accelerator radiocarbon dating indicate that at least three episodes of eolian sand movement occurred between 27 ka and 11 ka, possibly between 11 ka and 4 ka, and within the past 1.5 ka. Thus, eolian sand deposition took place under both glacial and interglacial climatic conditions. In the youngest episodes of eolian sand movement, Holocene parabolic dunes partially buried Pleistocene sand sheet deposits. Late Holocene sands in the Fort Morgan and Wray dune fields, to the south of the South Platte River, have trace element ratios that are indistinguishable from modern South Platte River sands, but different from Ogallala Formation bedrock, which has previously been cited as the main source of dune sand on the Great Plains. Sands in the Greeley dune field, to the north of the South Platte River, have trace element concentrations that indicate a probable Laramie Formation source. Measurements of parabolic dunes indicate paleowinds from the northwest in all dune fields, in good agreement with resultant drift directions calculated for nearby weather stations. Thus, paleowinds were probably not significantly different from present-day winds, and are consistent with a South Platte River source for the Fort Morgan and Wray dune fields, and a Laramie Formation source for the Greeley dune field. Sand accumulated downwind of the South Platte River to form the Fort Morgan dune field. In addition, sand was also transported farther downwind over the upland formed by the calcrete caprock of the Ogallala Formation, and deposited in die lee of the upland on the southeast side. Because of high wind energy, the upland itself served as a zone of sand transport, but little or no sand accumulation took place on this surface. These

  16. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 2. System performance and supporting studies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    The preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas, is presented. System performance analysis and evaluation are described. Feedback of completed performance analyses on current system design and operating philosophy is discussed. The basic computer simulation techniques and assumptions are described and the resulting energy displacement analysis is presented. Supporting technical studies are presented. These include health and safety and reliability assessments; solar collector component evaluation; weather analysis; and a review of selected trade studies which address significant design alternatives. Additional supporting studies which are generally specific to the installation site are reported. These include solar availability analysis; energy load measurements; environmental impact assessment; life cycle cost and economic analysis; heat transfer fluid testing; meteorological/solar station planning; and information dissemination. (WHK)

  17. Tourism development: sustainable or sustained? Intercultural reflections on the case of Praia do Forte-Bahia, Brazil

    Directory of Open Access Journals (Sweden)

    Simone Alves

    2009-01-01

    Full Text Available El artículo adoptó investigación exploratoria cualitativa, realizada con base al estudio de caso de Praia do Forte, un destino turístico localizado en la costa Brasileña. Fueron usados datos secundarios y entrevistas en profundidad con residentes locales, de modo a responder a la pregunta principal de investigación de como este destino podría seguir un camino de desarrollo turístico diferenciado y, como objetivo secundario, si el grado de desarrollo actual puede todavía ser considerado sustentable. Basado en una perspectiva de turismo sistémica, buscamos extender la visión de sustentabilidad para abarcar dimensiones socioculturales y ambientales según el modelo de Sachs (1986. Los resultados indican que tres factores parecen responder la pregunta.

  18. Changes after correction of maxillary retrusion by Le Fort I osteotomy. A comparison of 2 methods of skeletal fixation.

    Science.gov (United States)

    Rondahl, U S; Bystedt, H; Enqvist, B; Malmgren, O

    1988-06-01

    2 methods of skeletal fixation are compared in 24 patients with maxillary retrusion treated with Le Fort I osteotomy only: group I, intraosseous fixation only (10 patients); group II, enhanced fixation, intraosseous and suspension wires (14 patients). Follow-up checks on the patients were carried out using lateral cephalograms. The changes of the maxillary position in relation to the anterior cranial base were analyzed via a technique of superimposition in a computer system without using conventional landmarks. Vertical and horizontal changes and rotations were studied. The method error was small. In the vertical direction, there was a significant difference between the groups. In group I, the vertical relapse during the early postoperative period was 55%, while in group II, it was only 15%. The conclusion is that a rigid vertical fixation is needed.

  19. Preliminary assessment report for Fort William Henry Harrison, Montana Army National Guard, Helena, Montana. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    DuWaldt, J.; Meyer, T.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at a Montana Army National Guard (MTARNG) property near Helena, Montana. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort William Henry Harrison property, requirements of the Department of Defense Installation Restoration Program.

  20. Selected environmental and geohydrologic reports for the Fort Wainwright and Fairbanks areas, Alaska as of July 1995

    Science.gov (United States)

    Lilly, M.R.; DePalma, K.L.; Benson, S.L.

    1995-01-01

    As part of its effort to help collect data and gather information for geohydrologic investigations, the U.S. Geological Survey (USGS) collects and reviews environmental and technical reports relating to geology, hydrology, and geohydrology. The USGS investigation efforts are coordinated with ongoing technical investigations by the Water Research Center of the University of Alaska Fairbanks and the U.S. Army Cold Regions Research and Engineering Laboratory. One project objective for Fort Wainwright includes maintaining a library of report references for USGS project use and for use by the U.S. Army, Alaska (USARAK), USARAK contractors, and other Federal and State agencies. This report presents an annotated bibliography of reports relating to the project study area or geohydrologic processes important to investigations in the study area.

  1. Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins

    Energy Technology Data Exchange (ETDEWEB)

    Sumner, Dennis [City of Fort Collins Utilities, CO (United States); Vosburg, Tom [City of Fort Collins Utilities, CO (United States); Brunner, Steve [Brendle Group, Fort Collins, CO (United States); Gates, Judy [Woodward, Inc., Fort Collins, CO (United States); Howard, Nathan [Spirae, Inc., Fort Collins, CO (United States); Merton, Andrew [Spirae, Inc., Fort Collins, CO (United States); Wright, Don [Spirae, Inc., Fort Collins, CO (United States); Birlingmair, Doug [Spirae, Inc., Fort Collins, CO (United States)

    2015-10-01

    This project titled “Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins” evolved in response to the Department of Energy’s (DOE) Funding Opportunity Announcement (FOA) Number DE-PS26-07NT43119. Also referred to as the Fort Collins Renewable and Distributed System Integration (RDSI) Project, the effort was undertaken by a diverse group of local government, higher education and business organizations; and was driven by three overarching goals: I. Fulfill the requirements of the DOE FOA’s Area of Interest 2: Renewable and Distributed System Integration; most notably, to demonstrate the ability to reduce electric system distribution feeder peak load by 15% or more through the coordinated use of Distributed Energy Resources (DER). II. Advance the expertise, technologies and infrastructure necessary to support the long term vision of the Fort Collins Zero Energy District (FortZED) and move towards creating a zero energy district in the Fort Collins “Old Town” area. III. Further the goals of the City of Fort Collins Energy Policy, including the development of a Smart Grid-enabled distribution system in Fort Collins, expanded use of renewable energy, increased energy conservation, and peak load reduction. Through the collaborative efforts of the partner organizations, the Fort Collins RDSI project was successful in achieving all three of these goals. This report is organized into two distinct sections corresponding to the two phases of the project: • Part 1: Feeder Peak Load Reduction and the FortZED Initiative. • Part 2: Forming and Operating Utility Microgrids and Managing Load and Production Variability The original project scope addressed the Part 1 feeder peak load reduction. That work took place from 2009 through 2011 and was largely complete when the project scope was amended to include a demonstration of microgrid operations. While leveraging the

  2. Magnetic Fields

    OpenAIRE

    Schöller, Markus; Hubrig, Swetlana

    2015-01-01

    In this chapter, we give a brief introduction into the use of the Zeeman effect in astronomy and the general detection of magnetic fields in stars, concentrating on the use of FORS2 for longitudinal magnetic field measurements.

  3. What Do U.S. Army Field Grade Officers Perceive as Their Role in Building Resilience in Soldiers?

    Science.gov (United States)

    2012-12-14

    Like trying to pacify them, like giving a baby a pacifier to quiet them. Spoon feeding them the answer. Interviewer: Would you say you know a lot...Education or the School for Command Preparation and field grade officers that work/teach at the Command and General Staff College (CGSC) in Fort...regulation systems) and external or environmental systems/factors (family systems, school systems, peer systems, cultural and societal systems) that help

  4. The Fort McMurray Demonstration Project in Social Marketing: no demonstrable effect on already falling injury rates following intensive community and workplace intervention.

    Science.gov (United States)

    Guidotti, Tee L; Deb, Pooja; Bertera, Robert; Ford, Lynda

    2009-10-01

    The Fort McMurray Demonstration Project in Social Marketing attempted to achieve mutually reinforcing effects from thematically coordinated educational and awareness efforts in the community as a whole and in the workplace and the inclusion of occupational safety within the framework of a community health promotion project. The study community was Fort McMurray, a small, industrial city in northern Alberta. The Mistahiai Health Region, several hundred kilometers to the west and also dominated by one city, Grande Prairie, served as the reference community. The intervention was based on media and events staged at public events, with supporting educational activities in schools and the community. It relied heavily on community-based partners and volunteers. Data on healthcare utilization of selected preventable injuries were obtained from Alberta Health for the time period 1990-1996 for the Regional Health Authorities of Northern Lights, where the only large population centre is Fort McMurray, and Mistahia. Age-adjusted aggregate injury rates were analyzed for evidence of an effect of the intervention. Severity was measured by proxy, using the number of diagnostic claims submitted for reimbursement for medical services in a given year. The communities differed in age-specific injury rates, with Fort McMurray showing higher rates for residents aged less than 55. Young adults and older adolescents showed higher levels of severity. Injury rates fell substantially and at similar rates in both communities over the five-year period. However, in both communities injury rates were already falling before the intervention in Fort McMurray began and continued to fall at about the same rate, slowing toward the end of the period. No evidence was found for an effect of the Project or for acceleration of the reduction in injury frequency in the intervention area. Over the period, fewer medical services were delivered in office settings and more in emergency rooms, in both

  5. Hiérarchie des esprits et esprit fort : le discours médical

    Directory of Open Access Journals (Sweden)

    Isabelle Moreau

    2010-05-01

    Full Text Available L’esprit fort a-t-il un sexe au début de l’époque moderne ? Selon Londa Schiebinger (The Mind has no sex?, 1989 le cartésianisme rompt avec la tradition médicale en rendant impossible la liaison entre sexe et tempérament. En témoigne notamment le cartésien Poullain de la Barre et son livre De l’égalité des deux sexes, publié en 1673. C’est à la lumière de cette thèse que je voudrais évaluer la position des libertins érudits, et ainsi aborder la question du genre masculin, dans sa relation supposée privilégiée à l’incrédulité et au rejet des superstitions. Pour La Mothe Le Vayer, Naudé ou encore Cyrano, en effet, il n’existe pas de raison universelle « asexuée ». Ces libertins rejettent le dualisme cartésien et disqualifient la notion même de sens commun, pour mieux promouvoir une faculté de bien juger ou « Ingenium », directement héritée de Charron. Pour comprendre la masculinité de l’esprit fort, il faut ainsi revenir aux origines médicales de la hiérarchie entre les esprits, construite à partir de l’ancienne théorie humorale et tempéramentale héritée de Hippocrate, Aristote et Galien, retravaillée par Huarte en 1575, reprise ensuite par Charron et par sa postérité libertine. En revenant sur les discours médicaux et philosophiques qui construisent la masculinité de l’esprit fort, je montrerai comment cet idéal se construit sur un modèle de masculinité monologique (certes capable de degrés et de variations, plutôt que par opposition au féminin.Did the mind have a gender during the Early Modern period? According to Londa Schiebinger (The Mind Has No Sex?, 1989, Cartesian philosophy caused an abrupt change within the medical tradition by rendering the link between gender and temperament obsolete. Poullain de la Barre’s On the Equality of the Sexes, published in 1673, is a good example of this shift. It is in the light of this thesis that I intend to assess the Libertine

  6. Lake Worth bottom sediments : A chronicle of water-quality changes in western Fort Worth, Texas, 1914-2001

    Science.gov (United States)

    Braun, Christopher L.; Harwell, Glenn R.

    2004-01-01

    In spring 2000, the Texas Department of Health issued a fish-consumption advisory for Lake Worth, Tex., because of elevated concentrations of polychlorinated biphenyls (PCBs) in fish (Texas Department of Health, 2000). In response to the advisory and in cooperation with the U.S. Air Force, the U.S. Geological Survey (USGS) collected 21 surficial samples and three deeper gravity core samples from the sediment deposited at the bottom of Lake Worth. The purpose of that study was to assess the spatial distribution and historical trends of selected hydrophobic contaminants, including PCBs, and to determine, to the extent possible, sources of selected metals and hydrophobic organic contaminants (HOCs) to Lake Worth. Hydrophobic (literally “water fearing”) contaminants tend to chemically adsorb to soils and sediments. Fifteen of the top 20 contaminants on the Agency for Toxic Substances and Disease Registry (2001) priority list of hazardous substances are hydrophobic. Chemical analysis of sediment cores is one method that can be used to determine trends in HOCs such as PCBs. As sediments accumulate in lakes and reservoirs, they generate a partial historical record of water quality. This fact sheet describes the collection of sediment cores, age-dating methods, and historical trends in PCBs in Lake Worth sediments. The fact sheet also describes the spatial distribution of PCBs in surficial sediments and concludes with objectives for the second phase of data collection and the approach that will be used to achieve these objectives. The USGS published a comprehensive report on the first phase of the study (Harwell and others, 2003). Lake Worth is a reservoir on the West Fork Trinity River on the western edge of Fort Worth in Tarrant County. In 1914, the City of Fort Worth completed the reservoir to serve as a municipal water supply. Lake Worth has a surface area of 13.2 square kilometers and a storage capacity of 47 million cubic meters. The drainage area to the

  7. Total petroleum system assessment of undiscovered resources in the giant Barnett Shale continuous (unconventional) gas accumulation, Fort Worth Basin, Texas

    Science.gov (United States)

    Pollastro, R.M.

    2007-01-01

    Undiscovered natural gas having potential for additions to reserves in the Mississippian Barnett Shale of the Fort Worth Basin, north-central Texas, was assessed using the total petroleum system assessment unit concept and a cell-based methodology for continuous-type (Unconventional) resources. The Barnett-Paleozoic total petroleum system is defined in the Bend arch-Fort Worth Basin as encompassing the area in which the organic-rich Barnett is the primary source rock for oil and gas produced from Paleozoic carbonate and clastic reservoirs. Exploration, technology, and drilling in the Barnett Shale play have rapidly evolved in recent years, with about 3500 vertical and 1000 horizontal wells completed in the Barnett through 2005 and more than 85% of the them completed since 1999. Using framework geology and historical production data, assessment of the Barnett Shale was performed by the U.S. Geological Survey using vertical wells at the peak of vertical well completions and before a transition to completions with horizontal wells. The assessment was performed after (1) mapping critical geological and geochemical parameters to define assessment unit areas with future potential, (2) defining distributions of drainage area (cell size) and estimating ultimate recovery per cell, and (3) estimating future success rates. Two assessment units are defined and assessed for the Barnett Shale continuous gas accumulation, resulting in a total mean undiscovered volume having potential for additions to reserves of 26.2 TCFG. The greater Newark East fracture-barrier continuous Barnett Shale gas assessment unit represents a core-producing area where thick, organic-rich, siliceous Barnett Shale is within the thermal window for gas generation (Ro ??? 1.1%) and is overlain and underlain by impermeable limestone barriers (Pennsylvanian Marble Falls Limestone and Ordovician Viola Limestone, respectively) that serve to confine induced fractures during well completion to maximize gas

  8. Management and Data Management Plan for Remedial Investigation at Fort George G. Meade Landfill and Preliminary Assessment/Site Investigation at the Former Gaithersburg NIKE Control and Launch Areas

    National Research Council Canada - National Science Library

    Edwards, D

    1989-01-01

    Work assignments under this contract will include a Preliminary Assessment/Site Investigation at the former Gaithersburg NIKE Control and Launch Areas and a Remedial Investigation at the Fort Meade...

  9. Severe gummy smile with class II malocclusion treated with LeFort I osteotomy combined with horseshoe osteotomy and intraoral vertical ramus osteotomy.

    Science.gov (United States)

    Shimo, Tsuyoshi; Nishiyama, Akiyoshi; Jinno, Tokiari; Sasaki, Akira

    2013-01-01

    In this article, we report the successful surgical treatment of a patient, 34 years of age, who had a severe gummy smile and a class II malocclusion. The patient had an 11-mm gingival exposure during full smile and a convex profile. A LeFort I osteotomy combined with a horseshoe osteotomy was used for the superior repositioning of the maxilla;then, an intraoral vertical ramus osteotomy (IVRO) and genioplasty were performed for mandibular advancement. The maxilla was acceptably impacted 8mm at the first incisor and 5mm at the first molar. Both the occlusion and facial appearance were significantly improved by this surgical-orthodontic treatment. Our results suggest that the combination of a horseshoe osteotomy with a LeFort I osteotomy is a useful technique for reliable superior repositioning of the maxilla.

  10. Stability of the anterior maxillary segment and teeth after segmental le fort I osteotomy and postoperative skeletal elastic fixation with or without occlusal splint

    DEFF Research Database (Denmark)

    Blæhr, Tue Lindberg; Jensen, Thomas; Due, Karen Margrethe

    2014-01-01

    OBJECTIVES: To assess the short term dental and skeletal stability of the anterior maxillary segment after segmental Le Fort I osteotomy with postoperative skeletal elastic fixation with or without occlusal splint. MATERIAL AND METHODS: 29 consecutive patients underwent segmental Le Fort I...... osteotomy and elastic skeletal fixation was applied. Patients were divided into two groups according to whether a fixed occlusal splint was used for six weeks (group A) or dismounted perioperatively (group B). Changes in landmarks and reference planes between the two timepoints were estimated on lateral.......83 to 1.69°). There was no statistically significant difference in stability between the two groups at the P value 0.05. CONCLUSIONS: The skeletal anterior fixation with postoperative elastics for eight weeks may not compromise the early postoperative dental and skeletal stability of the anterior segment...

  11. Strategic Planning for Irwin Army Community Hospital: The Assessment and Implementation of Services, in Order to Meet Fort Riley’s Increasing Population

    Science.gov (United States)

    2008-07-05

    PESTLE Analysis 7 6 Appendix C . SWOT Analysis 77 Appendix D. IACH Potential Strategies Map 7 8 Appendix E. MEDCOM Strategy Map 7 9 Appendix F...rotated from duties in Europe to Fort Riley until 1965, when the Vietnam conflict called for 1st Division to leave its home. This deployment lasted...11 B S r- c IACH STRATEGIC PLAN 7 6 Appendix B. PESTLE Analysis Category Factors Political • Warrior in Transition Unit Emphasis

  12. Raw data report of elemental analyses from hydrogeochemical and stream sediment samples taken near Sterling and Fort Morgan, Northeastern Colorado, December 1976 and January 1977

    International Nuclear Information System (INIS)

    Maxwell, J.C.

    1977-03-01

    Water and sediment samples were collected from 125 sites near Sterling and Fort Morgan, Colorado, from Dec. 20, 1976, to Jan. 15, 1977. The samples were analyzed for U using fluorometry and delayed-neutron counting, and for various elements using emission spectrometry, energy-dispersive x-ray fluorometry, and neutron activation analysis. Several parameters were measured at each sample site during the sampling. The data from each sample site and for the elemental analyses are included in this document

  13. Establishment of ambient air quality trends using historical monitoring data from Edmonton and Fort McKay, Alberta[General Conference

    Energy Technology Data Exchange (ETDEWEB)

    Faisal, K.; Gamal El-Din, M. [Alberta Univ., Edmonton, AB (Canada). Dept. of Civil and Environmental Engineering; Kindzierski, W.B. [Alberta Univ., Edmonton, AB (Canada). Dept. of Civil and Environmental Engineering]|[SEACOR Environmental Inc., Edmonton, AB (Canada)

    2006-07-01

    Ambient air trends were assessed using data collected over an 8 year period from monitoring stations in Edmonton and Fort McKay, Alberta. In particular, the study evaluated the short term trends in the concentration of carbon monoxide (CO), nitrogen dioxide (NO{sub 2}), ozone (O{sub 3}), and particulate matter (PM{sub 2.5}) in Edmonton, as well as the NO{sub 2}, O{sub 3}, PM{sub 2.5}, and total hydrocarbons in Fort McKay. In order to evaluate the ambient air trends, this study examined the changes in concentrations of these pollutants between the 50 - 90 percentiles of concentration distributions for a calendar year. These statistics were assumed to be linear over the period of study and fitted using simple linear regression. Hypothesis tests were performed to determine if the slopes of the best-fit lines were greater or less than zero. There was no indication of a statistically significant short-term trend for NO{sub 2} and O{sub 3} for the city of Edmonton. However, statistically pronounced decreasing trends were noted for CO and PM{sub 2.5}. There was no indication of statistically significant trend for any of the pollutants examined at Fort McKay over the study period. It was cautioned that since the period of study over which trends were examined was short, the changes or lack of changes observed do not necessarily indicate long term trends. However, the results suggest that air quality has remained unchanged during the last 6 to 8 years, despite increased economic development in Edmonton and continued oil sands development in Fort McKay.

  14. Magnetic Field

    DEFF Research Database (Denmark)

    Olsen, Nils

    2015-01-01

    of the fluid flow at the top of the core. However, what is measured at or near the surface of the Earth is the superposition of the core field and fields caused by magnetized rocks in the Earth’s crust, by electric currents flowing in the ionosphere, magnetosphere, and oceans, and by currents induced......he Earth has a large and complicated magnetic field, the major part of which is produced by a self-sustaining dynamo operating in the fluid outer core. Magnetic field observations provide one of the few tools for remote sensing the Earth’s deep interior, especially regarding the dynamics...... in the Earth by time-varying external fields. These sources have their specific characteristics in terms of spatial and temporal variations, and their proper separation, based on magnetic measurements, is a major challenge. Such a separation is a prerequisite for remote sensing by means of magnetic field...

  15. Hydrogeology and water quality of the Floridan aquifer system and effects of Lower Floridan aquifer pumping on the Upper Floridan aquifer at Fort Stewart, Georgia

    Science.gov (United States)

    Clarke, John S.; Cherry, Gregory C.; Gonthier, Gerard

    2011-01-01

    Test drilling, field investigations, and digital modeling were completed at Fort Stewart, GA, during 2009?2010, to assess the geologic, hydraulic, and water-quality characteristics of the Floridan aquifer system and evaluate the effect of Lower Floridan aquifer (LFA) pumping on the Upper Floridan aquifer (UFA). This work was performed pursuant to the Georgia Environmental Protection Division interim permitting strategy for new wells completed in the LFA that requires simulation to (1) quantify pumping-induced aquifer leakage from the UFA to LFA, and (2) identify the equivalent rate of UFA pumping that would produce the same maximum drawdown in the UFA that anticipated pumping from LFA well would induce. Field investigation activities included (1) constructing a 1,300-foot (ft) test boring and well completed in the LFA (well 33P028), (2) constructing an observation well in the UFA (well 33P029), (3) collecting drill cuttings and borehole geophysical logs, (4) collecting core samples for analysis of vertical hydraulic conductivity and porosity, (5) conducting flowmeter and packer tests in the open borehole within the UFA and LFA, (6) collecting depth-integrated water samples to assess basic ionic chemistry of various water-bearing zones, and (7) conducting aquifer tests in new LFA and UFA wells to determine hydraulic properties and assess interaquifer leakage. Using data collected at the site and in nearby areas, model simulation was used to assess the effects of LFA pumping on the UFA. Borehole-geophysical and flowmeter data indicate the LFA at Fort Stewart consists of limestone and dolomitic limestone between depths of 912 and 1,250 ft. Flowmeter data indicate the presence of three permeable zones at depth intervals of 912-947, 1,090-1,139, and 1,211?1,250 ft. LFA well 33P028 received 50 percent of the pumped volume from the uppermost permeable zone, and about 18 and 32 percent of the pumped volume from the middle and lowest permeable zones, respectively. Chemical

  16. Detailed workplan for innovative technology demonstrations to support existing treatment operations at the Installation Logistics Center, DSERTS Site FTLE-33, Fort Lewis, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Liikala, T.L.

    1998-07-01

    This workplan is an assemblage of documents for use by Pacific Northwest National Laboratory (PNNL) to direct and control project activities at Fort Lewis, Washington. Fort Lewis is a FORSCOM installation, whose Logistics Center (DSERTS Site FTLE-33) was placed on the National priorities List (NPL) in December 1989, as a result of trichloroethene (TCE) contamination in groundwater beneath the site. Site background information and brief descriptions of the Fort Lewis project and the main supporting documents, which will be used to direct and control the project activities, are provided. These are followed by a summary of the Work Breakdown Structure (WBS) elements, a general project schedule, a list of major deliverables, and a budget synopsis. Test plans for specific elements (Bench-Scale Testing) will be developed separately as those elements are initiated. If additional activities not specifically addressed in the Project Management Plan (Attachment 1) are added to the work scope, addendums to this workplan will be prepared to cover those activities.

  17. Effects of irrigating with wastewater on ground-water quality at Fort Carson Military Reservation golf course near Colorado Springs, Colorado

    Science.gov (United States)

    Edelmann, Patrick

    1984-01-01

    Fort Carson Military Reservation has used treatment wastewater for irrigation of the Fort Carson golf course since 1971. The effect of applied wastewater on groundwater quality at Fort Carson golf course was evaluated using water levels and water-quality data from 20 observation wells. The water-quality constituents analyzed included dissolved solids, major ions, nutrients, detergents, dissolved organic carbon, chemical and biological oxygen demand, and trace elements. Effects of the applied wastewater on ground-water quality for most constituents were obscured by large areal variations and by high concentrations of the constituents upgradient from the golf course. The sources of nitrogen observed in the ground water beneath the golf course were applied wastewater, applied fertilizer, leachate from the organic-rich shale, and from unknown upgradient sources. Nitrogen loading at the golf course from wastewater and applied fertilizer was estimated to be 18 ,900 pounds per year. After 10 years, less than 1 percent of the nitrogen applied was actually present in the ground water. Loss of nitrogen to the atmosphere as nitrous oxides, absorption, and to fixation by grass resulted in the much smaller concentrations observed in the ground water. (USGS)

  18. Immediate loading of dental implants placed in severely resorbed edentulous maxillae reconstructed with Le Fort I osteotomy and interpositional bone grafting.

    Science.gov (United States)

    Pieri, Francesco; Lizio, Giuseppe; Bianchi, Alberto; Corinaldesi, Giuseppe; Marchetti, Claudio

    2012-08-01

    Reconstruction and rehabilitation of atrophic maxillae with bone grafts is a lengthy and demanding procedure. This study reports the immediate loading of 50 implants placed on six extremely atrophied edentulous maxillae reconstructed with Le Fort I osteotomy and iliac bone grafting. Six patients, aged 49 to 68 years, with severely atrophied maxillae were treated with Le Fort I osteotomy and iliac bone grafting to allow for implant-borne prosthetic rehabilitation. Four to 5 months thereafter, 50 implants (seven to 10 per patient) were placed in reconstructed maxillae and immediately functionally loaded with a screw-retained definitive prosthesis. The patients were followed by clinical and radiographic examinations for 24 months after prosthetic loading. The grafting procedure and healing period before implant placement were uneventful in all patients. Two implants were lost within 2 months after prosthesis insertion in two patients, with an overall survival rate of 96%. The prostheses success rate was 100%. At the end of the follow-up period, all remaining implants appeared clinically healthy; crestal bone loss was >1.7 mm for six implants, resulting in a cumulative success rate of 84%. Immediate loading of implants placed after Le Fort I osteotomy and interpositional iliac bone grafting could be considered a viable protocol to rehabilitate extremely atrophied edentulous maxillae, considerably reducing the treatment time.

  19. Experiments on heat pipes submitted to strong accelerations; Experimentation de caloducs soumis a de fortes accelerations

    Energy Technology Data Exchange (ETDEWEB)

    Labuthe, A. [Dassault Aviation, 92 - Saint Cloud (France)

    1996-12-31

    In order to evaluate the possibility to use heat pipes as efficient heat transfer devices in aircrafts, a study of their behaviour during strong accelerations is necessary. This study has been jointly carried out by the Laboratory of Thermal Studies of Poitiers (France) and Dassault Aviation company. It is based on a series of tests performed with an experimental apparatus that uses the centrifugal effect to simulate the acceleration fields submitted to the heat pipe. Un-priming - priming cycles have been performed under different power and acceleration levels and at various functioning temperatures in order to explore the behaviour of heat pipes: rate of un-priming and re-priming, functioning in blocked mode etc.. This preliminary study demonstrates the rapid re-priming of the tested heat pipes when submitted to favourable acceleration situations and the possibility to use them under thermosyphon conditions despite the brief unfavourable acceleration periods encountered. (J.S.)

  20. Hibiscus latent Fort Pierce virus in Brazil and synthesis of its biologically active full-length cDNA clone.

    Science.gov (United States)

    Gao, Ruimin; Niu, Shengniao; Dai, Weifang; Kitajima, Elliot; Wong, Sek-Man

    2016-10-01

    A Brazilian isolate of Hibiscus latent Fort Pierce virus (HLFPV-BR) was firstly found in a hibiscus plant in Limeira, SP, Brazil. RACE PCR was carried out to obtain the full-length sequences of HLFPV-BR which is 6453 nucleotides and has more than 99.15 % of complete genomic RNA nucleotide sequence identity with that of HLFPV Japanese isolate. The genomic structure of HLFPV-BR is similar to other tobamoviruses. It includes a 5' untranslated region (UTR), followed by open reading frames encoding for a 128-kDa protein and a 188-kDa readthrough protein, a 38-kDa movement protein, 18-kDa coat protein, and a 3' UTR. Interestingly, the unique feature of poly(A) tract is also found within its 3'-UTR. Furthermore, from the total RNA extracted from the local lesions of HLFPV-BR-infected Chenopodium quinoa leaves, a biologically active, full-length cDNA clone encompassing the genome of HLFPV-BR was amplified and placed adjacent to a T7 RNA polymerase promoter. The capped in vitro transcripts from the cloned cDNA were infectious when mechanically inoculated into C. quinoa and Nicotiana benthamiana plants. This is the first report of the presence of an isolate of HLFPV in Brazil and the successful synthesis of a biologically active HLFPV-BR full-length cDNA clone.

  1. Prevalence and Antibiogram Profiling of Escherichia coli Pathotypes Isolated from the Kat River and the Fort Beaufort Abstraction Water

    Directory of Open Access Journals (Sweden)

    Nolonwabo Nontongana

    2014-08-01

    Full Text Available Escherichia coli is a widespread bacterium encompassing a variety of strains, ranging from highly pathogenic strains, causing worldwide outbreaks of severe diseases to avirulent, well characterized safe laboratory strains. This study evaluated the prevalence and antibiogram profiles of E. coli pathotypes isolated from the Kat River and Fort Beaufort abstraction water. A total of 171 out of 278 confirmed E. coli isolates were positive for at least one pathogenic determinant and these included enteropathogenic E. coli (6%, enterotoxigenic E. coli (47%, uropathogenic E. coli (2%, neonatal meningitis E. coli (5%, diffusely adherent E. coli (1% and enterohaemorrhagic E. coli (1%. Interestingly, enteroinvasive and enteroaggregative E. coli were not detected. The phenotypic antibiogram profiles of the isolates revealed that all were resistant to penicillin G, while 98% and 38% of the pathotypes were resistant to ampicillin and trimethoprim-sulphamethoxazole, respectively. About 8% of the isolates were resistant to streptomycin. More than half of the isolates exhibited multiple antibiotic resistance with 44% being resistant to three antibiotics and 8% resistant to four antibiotics. We conclude that the Kat River is a reservoir of potentially virulent antibiotic resistant E. coli strains that can cause serious health risks to humans who drink raw water from this river, or in the case that consumption of treated drinking water coincides with failed drinking water processes.

  2. A Terminal Area Analysis of Continuous Ascent Departure Fuel Use at Dallas/Fort Worth International Airport

    Science.gov (United States)

    Roach, Keenan; Robinson, John E., III

    2010-01-01

    Aircraft departing from the Dallas/Fort Worth International Airport (DFW) encounter vertical restrictions that prevent continuous ascent operations. The result of these restrictions are temporary level-offs at 10,000 feet. A combination of flow direction, specific Area Navigation (RNAV) route geometry, and arrival streams have been found to be the biggest factors in the duration and frequency of a temporary level-offs. In total, 20% of DFW departures are affected by these level-offs, which have an average duration of just over 100 seconds. The use of continuous descent approaches at DFW are shown to lessen the impact arrivals have on the departures and allow more continuous ascents. The fuel used in a continuous ascent and an ascent with a temporary level-off have been calculated using a fuel burn rate model created from a combination of actual aircraft track data, aircraft manufacturer flight operations manuals, and Eurocontrol's Base of Aircraft Data (BADA) simulation tool. This model represents the average aggregate burn rates for the current fleet mix at DFW. Continuous ascents would save approximately seven gallons of fuel out of 450 gallons used to climb to a cruise altitude of 31,000ft per departure.

  3. Exposure to and precautions for blood and body fluids among workers in the funeral home franchises of Fort Worth, Texas.

    Science.gov (United States)

    Nwanyanwu, O C; Tabasuri, T H; Harris, G R

    1989-08-01

    In 1982 the Centers for Disease Control published a set of recommendations and measures to protect persons working in health care settings or performing mortician services from possible exposure to the human immunodeficiency virus. This study of a number of funeral homes in the Fort Worth area was designed to determine the level of exposure of funeral home workers to blood and other body fluids and also to assess existing protective measures and practices in the industry. Workers in 22 funeral home franchises were surveyed with a predesigned questionnaire. Eighty-five responses from 20 of the 22 establishments were received. All 85 respondents admitted exposure of varying degrees to blood and body fluids. Sixty persons (70%) admitted heavy exposure, that is, frequent splashes. Analysis of the responses showed that 81 of 85 (95.3%) persons consistently wore gloves while performing tasks that might expose them to blood or other body fluids. Of the 60 persons who were heavily exposed, 43 wore long-sleeved gowns, 27 wore waterproof aprons, 17 surgical masks, and 15 goggles. The study further revealed that 52.9% (45/85) of the respondents had sustained accidental cuts or puncture wounds on the job. In light of these findings it is important to target educational efforts to persons in this industry to help them minimize their risks of infection with blood and body fluid borne infections.

  4. Summary of hydrologic testing of the Floridan aquifer system at Fort Stewart, coastal Georgia, 2009-2010

    Science.gov (United States)

    Gonthier, Gerald J.

    2011-01-01

    Two test wells were completed at Fort Stewart, coastal Georgia, to investigate the potential for using the Lower Floridan aquifer as a source of water to satisfy anticipated, increased water needs. The U.S. Geological Survey, in cooperation with the U.S. Department of the Army, completed hydrologic testing of the Floridan aquifer system at the study site, including flowmeter surveys, slug tests, and 24- and 72-hour aquifer tests by mid-March 2010. Analytical approaches and model simulation were applied to aquifer-test results to provide estimates of transmissivity and hydraulic conductivity of the multilayered Floridan aquifer system. Data from a 24-hour aquifer test of the Upper Floridan aquifer were evaluated by using the straight-line Cooper-Jacob analytical method. Data from a 72-hour aquifer test of the Lower Floridan aquifer were simulated by using axisymmetric model simulations. Results of aquifer testing indicated that the Upper Floridan aquifer has a transmissivity of 100,000 feet-squared per day, and the Lower Floridan aquifer has a transmissivity of 7,000 feet-squared per day. A specific storage for the Floridan aquifer system as a result of model calibration was 3E-06 ft–1. Additionally, during a 72-hour aquifer test of the Lower Floridan aquifer, a drawdown response was observed in two Upper Floridan aquifer wells, one of which was more than 1 mile away from the pumped well.

  5. Geothermal investment analysis with site-specific applications to Roosevelt Hot Springs and Cove Fort-Sulphurdale, Utah

    Energy Technology Data Exchange (ETDEWEB)

    Cassel, T.A.V.; Edelstein, R.H.; Blair, P.D.

    1978-12-01

    The analysis and modeling of investment behavior in the development of hydrothermal electric power facilities are reported. This investment behavior reflects a degree of sensitivity to public policy alternatives concerning taxation and regulation of the resource and its related energy conversion facilities. The objective of the current research is to provide a realistic and theoretically sound means for estimating the impacts of such public policy alternatives. A stochastic simulation model was developed which offers an efficient means for site-specific investment analysis of private sector firms and investors. The results of the first year of work are discussed including the identification, analysis, quantification and modeling of: a decision tree reflecting the sequence of procedures, timing and stochastic elements of hydrothermal resource development projects; investment requirements, expenses and revenues incurred in the exploration, development and utilization of hydrothermal resources for electric power generation; and multiattribute investment decision criteria of the several types of firms in the geothermal industry. An application of the investment model to specific resource sites in the state of Utah is also described. Site specific data for the Known Geothermal Resource Areas of Roosevelt Hot Springs and Cove Fort-Sulphurdale are given together with hypothesized generation capacity growth rates.

  6. A report of 2 patients with transient blindness following Le Fort I osteotomy and a review of past reported cases

    Directory of Open Access Journals (Sweden)

    Philip Mathew

    2015-01-01

    Full Text Available Blindness following a LeFort I osteotomy is a rare but extremely serious complication. Ten cases have been reported to date. None of these patients recovered vision. Optic neuropathy is believed to be the cause but the exact mechanism has not been settled. We report the first, and the only two, documented cases of complete loss of vision that recovered subsequently. The first patient was a 19-year-old male with repaired bilateral cleft lip and palate. He developed loss of vision in the right eye on the second postoperative day. The second patient was a 22-year-old male with repaired unilateral cleft lip and palate. He developed complete loss of vision in the left eye on the day of surgery. Both these patients underwent ongoing studies, which did not show any abnormalities. Both were treated with methylprednisolone. Both the patients gradually showed improvement in their vision. The first patient recovered normal vision several months postoperatively. The second patient′s vision improved to 4/60 by 4 months postoperatively. We discuss the probable mechanisms of optic nerve injury and also the possible reasons why sight was restored in these patients. This is a rare but serious complication following a fairly common procedure. Through this article we wish to create an awareness of this complication and also a possible way of avoiding such a disaster.

  7. Energy and water exchange from a saline-sodic overburden restoration cover, Fort McMurray, Alberta

    International Nuclear Information System (INIS)

    Carey, S.

    2006-01-01

    The Canadian oil sand mining industry takes responsibility for restoring mining areas to an equivalent level that existed before mining occurred. During this process, the surface-vegetation-atmosphere continuum is dramatically altered, creating few similarities to the boreal forest that existed prior to mining. Using the eddy covariance method, a study of the integrated salt and water balance of a saline-sodic overburden pile at Syncrude Canada Ltd.'s Mildred Lake mine north of Fort McMurray, Alberta was undertaken in order to measure the surface energy balance for three summers (2003 - 2005) with different climatic and phenological conditions. The objective of this study was to document how evapotranspiration and energy partitioning varied inter-annually during the growing season atop the restoration cover and to relate the portioning of energy at the surface to environmental and physiological variables. The paper described the site and measurement specifics and also presented the results and discussion. Results were organized under the following topics: climate; soil moisture and suction; leaf area index and vegetation; surface energy balance; evapotranspiration; and controls on evapotranspiration. It was concluded that results from this study have important implications for recovery strategies, as the availability water for plant growth, the movement and migration of salts and percolating water for deep drainage all depend on accurate quantification of evapotranspiration. 9 refs., 1 tab

  8. Boiling-induced nanoparticles and their constitutive proteins from Isatis indigotica Fort. root decoction: Purification and identification.

    Science.gov (United States)

    Zhou, Jianwu; Liu, Jie; Lin, Dai; Gao, Guanzhen; Wang, Huiqin; Guo, Jingke; Rao, Pingfan; Ke, Lijing

    2017-04-01

    Colloidal particles are essential components of sun-dried Isatis indigotica Fort. roots (Ban-Lan-Gen in Chinese, BLG) decoction. Nanoparticles (NPs) were isolated from BLG decoction with size exclusion chromatography and characterized. Their average diameter is ∼120 nm, reversibly responding to pH and temperature changes. They promoted the growth of normal cells but suppressed that of cancerogenic cells and macrophages. Two constitutive glycated proteins were identified from the NPs, namely BLGP1 and BLGP2. Their N-terminal amino acid sequences were V-X-R-E-V-V-K-D-I and V-V-R-E-V-V-K-D-I-A-G-A-V-Q-T-N-E-Q-Y. Their full-length cDNA sequences were cloned to obtain the highly homological amino acid sequences of non-glycated proteins, whose theoretical molecular weights are 21831.64 Da and 21841.67 Da. Using pepsin hydrolysis and mass spectrometry, four possible glycation adducts were identified in BLGP1, whereas one in BLGP2. To conclude, bioactive nanoparticles isolated from the herbal decoction are intelligent nanoassemblies composed of a new boiling-stable protein. Glycation plays a critical role in heat-induced formation of these nanoassemblies. The novel, intelligent, safe and stable nano-carriers for drug delivery may be developed using BLG NPs as prototype.

  9. Long-term follow-up of syndromic craniosynostosis after Le Fort III halo distraction: a cephalometric and CT evaluation.

    Science.gov (United States)

    Meazzini, Maria Costanza; Allevia, Fabiana; Mazzoleni, Fabio; Ferrari, Luca; Pagnoni, Mario; Iannetti, Giorgio; Bozzetti, Alberto; Brusati, Roberto

    2012-04-01

    Midface distraction osteogenesis (DO) in craniofacial synostosis (CFS) patients has been described by several authors. However, very few cephalometric and computed tomography (CT) long-term follow-up studies are available. A total of 40 consecutive patients affected by CFS subjected to Le Fort III and rigid external distraction (RED) were examined. All patients had pre-DO cephalometric records, immediately post-DO and 6-12 months post-DO. Twenty-seven patients had mid-term records (3 years post-DO) and 20 patients had long-term records (5-10 years post-DO). Fourteen patients had CT data within 1-year of DO, while 10 patients had long-term CT data (range 5-9 years). Excellent post-surgical stability was recorded. Short- and long-term CT data demonstrated excellent ossification at the osteotomy sites post-DO. In the growing patients, surface resorption in the zygomatic-temporal and in the subspinal area (p term follow-up, as well as a mild increment of the corrected exorbitism (p term, in growing patients, in general a class III malocclusion does not re-occur, but physiological remodelling processes at the maxillary-zygomatic level, not coupled with sutural growth, tend to mildly re-express the original midfacial phenotype and the exorbitism. Copyright © 2011 British Association of Plastic, Reconstructive and Aesthetic Surgeons. Published by Elsevier Ltd. All rights reserved.

  10. Data collection for cooperative water resources modeling in the Lower Rio Grande Basin, Fort Quitman to the Gulf of Mexico.

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard David; Pallachula, Kiran (GRAM, Inc., Albuquerque, NM); Tidwell, Vincent Carroll; Villalobos, Joshua (Texas A& M University); Piccinni, Giovanni (Texas A& M University); Brainard, James Robert; Gerik, Thomas (Texas A& M University); Morrison, Wendy (Texas A& M University); Serrat-Capdevila, Aleix (University of Arizona); Valdes, Juan (University of Arizona); Sheng, Zhuping (Texas A& M University); Lovato, Rene (Instituto Mexicano de Tecnologia del Agua); Guitron, Alberto (Instituto Mexicano de Tecnologia del Agua); Ennis, Martha Lee; Aparicio, Javier (Instituto Mexicano de Tecnologia del Agua); Newman, Gretchen Carr (GRAM, Inc., Albuquerque, NM); Michelsen, Ari M. (Texas A& M University)

    2004-10-01

    Water resource scarcity around the world is driving the need for the development of simulation models that can assist in water resources management. Transboundary water resources are receiving special attention because of the potential for conflict over scarce shared water resources. The Rio Grande/Rio Bravo along the U.S./Mexican border is an example of a scarce, transboundary water resource over which conflict has already begun. The data collection and modeling effort described in this report aims at developing methods for international collaboration, data collection, data integration and modeling for simulating geographically large and diverse international watersheds, with a special focus on the Rio Grande/Rio Bravo. This report describes the basin, and the data collected. This data collection effort was spatially aggregated across five reaches consisting of Fort Quitman to Presidio, the Rio Conchos, Presidio to Amistad Dam, Amistad Dam to Falcon Dam, and Falcon Dam to the Gulf of Mexico. This report represents a nine-month effort made in FY04, during which time the model was not completed.

  11. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  12. Historiography and forensic analysis of the Fort King George "skull": craniometric assessment using the specific population approach.

    Science.gov (United States)

    Stojanowski, Christopher M; Duncan, William N

    2009-10-01

    In this article, we evaluate the association between the Fort King George "skull" and two Franciscans who were killed during a Guale revolt in 1597 and whose remains were never recovered (Pedro de Corpa and Francisco de Veráscola). The history and historiography of the revolt is summarized to generate a forensic profile for the individuals. The calvaria is described in terms of preservation, taphonomy, possible trauma, age, and sex. Because these factors are consistent with the individuals in question, population affinity is assessed using comparative craniometric analysis. In response to recent criticism of the typological nature of forensic population affinity assessment, we use a population specific approach, as advocated by Alice Brues (1992). Archaeological and historical data inform the occupation history of the site, and data from those specific populations are used in the comparative analysis. Results of linear discriminant function analysis indicate a low probability that the calvaria is a Guale (the precontact inhabitants of southeastern Georgia) or an individual of African descent. Comparison among European and Euro-American populations indicated poor discriminatory resolution; however, the closest match suggests a New World affinity rather than an Old World English, Scottish, or Iberian affinity for the specimen. Future analyses that will provide greater resolution about the identity of the calvaria are outlined. The case highlights the unique challenges of historical forensics cases relative to those of traditional jurisprudence, as well as the potential for using historiography to overcome those challenges in future analyses.

  13. Technical and regulatory review of the Rover nuclear fuel process for use on Fort St. Vrain fuel

    International Nuclear Information System (INIS)

    Hertzler, T.

    1993-02-01

    This report describes the results of an analysis for processing and final disposal of Fort St. Vrain (FSV) irradiated fuel in Rover-type equipment or technologies. This analysis includes an evaluation of the current Rover equipment status and the applicability of this technology in processing FSV fuel. The analyses are based on the physical characteristics of the FSV fuel and processing capabilities of the Rover equipment. Alternate FSV fuel disposal options are also considered including fuel-rod removal from the block, disposal of the empty block, or disposal of the entire fuel-containing block. The results of these analyses document that the current Rover hardware is not operable for any purpose, and any effort to restart this hardware will require extensive modifications and re-evaluation. However, various aspects of the Rover technology, such as the successful fluid-bed burner design, can be applied with modification to FSV fuel processing. The current regulatory climate and technical knowledge are not adequately defined to allow a complete analysis and conclusion with respect to the disposal of intact fuel blocks with or without the fuel rods removed. The primary unknowns include the various aspects of fuel-rod removal from the block, concentration of radionuclides remaining in the graphite block after rod removal, and acceptability of carbon in the form of graphite in a high level waste repository

  14. In Situ Redox Manipulation Proof-of-Principle Test at the Fort Lewis Logistics Center: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Vermeul, Vincent R.; Williams, Mark D.; Evans, John C.; Szecsody, James E.; Bjornstad, Bruce N.; Liikala, Terry L.

    2000-10-25

    Pacific Northwest National Laboratory conducted a proof-of-principle test at the Fort Lewis Logistics Center to determine the feasibility of using the innovative remedial technology In Situ Redox Manipulation (ISRM) to treat groundwater contaminated with dissolved TCE. ISRM creates a permeable treatment zone in the subsurface to remediate redox-sensitive contaminants in groundwater. The permeable treatment zone is created by injecting a chemical reducing agent (sodium dithionite with pH buffers) into the aquifer through a well to chemically reduce the naturally occurring ferric iron in the sediments to ferrous iron. Once the reducing agent has been given sufficient time to react with aquifer sediments, residual chemicals and reaction products are withdrawn through the same well. Redox-sensitive contaminants such as TCE, moving in a dissolved-phase plume through the treatment zone, are destroyed. TCE is degraded via reductive dechlorination within the treatment zone to benign degradation products (acetylene, ehtylene). Analyses of sediment samples collected from post-test boreholes showed a high degree of iron reduction, which confirmed the effectiveness of the treatment zone.

  15. Field tests of diffusion samplers for inorganic constituents in wells and at a ground-water discharge zone

    Science.gov (United States)

    Vroblesky, Don A.; Petkewich, Matthew D.; Campbell, Ted R.

    2002-01-01

    Field tests were performed on two types of diffusion samplers to collect representative samples of inorganic constituents from ground water in wells and at an arsenic-contaminated ground-water-discharge zone beneath a stream. Nylon-screen samplers and dialysis samplers were tested for the collection of arsenic, calcium, chloride, iron, manganese, sulfate, and dissolved oxygen. The investigations were conducted at the Naval Industrial Reserve Ordnance Plant (NIROP), Fridley, Minnesota, and at the Naval Air Station Fort Worth Joint Reserve Base (NAS Fort Worth JRB), Texas. Data indicate that, in general, nylon-screen and dialysis diffusion samplers are capable of obtaining concentrations of inorganic solutes in ground water that correspond to concentrations obtained by low-flow sampling. Diffusion samplers offer a potentially time-saving approach to well sampling. Particular care must be taken, however, when sampling for iron and other metals, because of the potential for iron precipitation by oxygenation and when dealing with chemically stratified sampling intervals. Simple nylon-screen jar samplers buried beneath creekbed sediment appear to be effective tools for locating discharge zones of arsenic contaminated ground water. Although the LDPE samplers have proven to be inexpensive and simple to use in wells, they are limited by their inability to provide a representative sample of ionic solutes. The success of nylon-screen samplers in sediment studies suggests that these simple samplers may be useful for collecting water samples for inorganic constituents in wells. Results using dialysis bags deployed in wells suggest that these types of samplers have the potential to provide a representative sample of both VOCs and ionic solutes from ground water (Kaplan and others, 1991; Theodore A. Ehlke, U.S. Geological Survey, written commun., 2001). The purpose of this report is to provide results of field tests investigating the potential to use diffusion samplers to collect

  16. Quitosana no controle pós-colheita da podridão mole em caqui 'rama forte' Chitosan on the postharvest control of soft rot in 'rama forte' persimmon

    Directory of Open Access Journals (Sweden)

    Patrícia Cia

    2010-01-01

    Full Text Available Este trabalho objetivou avaliar o efeito da quitosana, aliada ao processo de destanização, no controle de Rhizopus stolonifer em caqui 'Rama Forte' e sobre o crescimento micelial do fungo in vitro. Caquis foram submetidos ao processo de destanização com CO2 (70% / 18 horas, em tambores herméticos, sendo em seguida submetidos à inoculação com suspensão de esporos de R. stolonifer (3x10(5 esporos mL-1. Após inoculação, os frutos permaneceram por 2 horas a 25 °C, quando foram imersos em quitosana (0; 0,5; 1,0; 1,5 e 2,0%, por 1 minuto. Os frutos foram mantidos a 25 °C / 80% UR e avaliados quanto à severidade e incidência da podridão mole, durante cinco dias. Após o período de armazenamento, avaliaram-se a coloração de casca, a firmeza e o índice de adstringência. In vitro, avaliou-se o crescimento micelial em placas contendo meio BDA incorporado com quitosana ou ácido cítrico. Os resultados mostraram que a quitosana, a 1,5%, reduz a severidade e a incidência da podridão mole em caquis e não influencia no processo de perda de adstringência, firmeza e na coloração de casca. In vitro, a quitosana inibe completamente o crescimento micelial de R. stolonifer, em concentração tão baixa quanto 0,5%.The objective of this research was to evaluate the effect of chitosan in addition to de-astringency process on the control of Rhizopus stolonifer in 'Rama Forte' persimmon and on in vitro mycelial growth. Persimmon were submitted to de-astringency process using CO2 (70% / 18 h, in hermetic chambers. Next, fruit were inoculated through subcuticular injections of a R. stolonifer spore suspension (3x10(5 spore mL-1 and 2 hours later at 25 °C immersed into chitosan (0, 0.5, 1.0, 1.5, and 2.0%, for 1 min. Fruit were stored at 25 °C / 80% RH, and checked for rot severity and incidence of soft rot, during 5-days of storage. After storage the skin color, firmness and astringency index were evaluated in persimmons. In vitro, mycelial

  17. Avaliação de linhas de beneficiamento e impactos de queda na qualidade de caqui "Rama Forte" Packing line evaluation for drop impacts on persimmon quality "rama forte"

    Directory of Open Access Journals (Sweden)

    Silvia R. de T. Valentini

    2009-01-01

    Full Text Available O manuseio inadequado e excessivo de frutas e de hortaliças causa alta incidência de danos físicos e, consequentemente, perdas pós-colheita. O objetivo deste trabalho foi avaliar a magnitude de impacto em linhas de beneficiamento e classificação para caqui "Rama Forte" e determinar, em laboratório, seus limites de impactos. Para a avaliação dos pontos críticos, foi utilizada uma esfera instrumentada de 76 mm de diâmetro (Techmark, Inc., Lansing, EUA, que registrou a magnitude dos impactos em sete equipamentos distintos de quatro unidades de beneficiamento. A determinação de danos físicos foi feita em testes laboratoriais, nos quais a queda dos frutos foi relacionada com a magnitude de impacto, incidência de danos físicos e perdas na qualidade do fruto. Nas linhas de beneficiamento, os valores de impactos encontrados variaram de 21 a 87 G nos pontos de transferência, e a maioria dos impactos registrados (acima de 94% durante a passagem pela linha foram de valores de até 50 G. Alturas de queda a partir de 20 cm causaram aumento na perda de massa do caqui no sexto dia de armazenamento, em temperatura ambiente. As quedas de 20 e 30 cm causaram maior escurecimento da casca (menores valores de L, associada à redução da intensidade da cor (chroma. O impacto não causou efeito nas características químicas da polpa do fruto.Excessive and inadequate handling of fruits and vegetables provides high incidences of physical damage, consequently, post harvest losses. The main goal of this work was to evaluate the impact magnitude in persimmon packing lines, "Rama Forte", and to determine, at the laboratory, its impact limits. For evaluating the critical points it was used an instrumented sphere of 76 mm of diameter (Technmark, Inc, Lansing, USA, which registered the impact magnitude in seven distinctive impact lines located in four packing houses. For determining physical damages, tests were carried out at the laboratory, where fruit drop

  18. Magnetic fields

    International Nuclear Information System (INIS)

    Mestel, L.; Arizona Univ., Tucson)

    1985-01-01

    The role of the Galactic magnetic field in the early stages of star formation is examined. The dynamical and observational consequences of the anisotropic collapse of cool gas clouds permeated by the local Galactic magnetic field are discussed. Magneto-gravitational equilibria of such clouds with subcritical mass-flux ratios, especially in the thin disk approximation, are addressed. Magnetic braking of both subcritical and supercritical masses is considered, and the consequences of flux leakage during the molecular cloud phase are discussed, including the effect on field topology

  19. Field arithmetic

    CERN Document Server

    Fried, Michael D

    2006-01-01

    Field Arithmetic explores Diophantine fields through their absolute Galois groups. This largely self-contained treatment starts with techniques from algebraic geometry, number theory, and profinite groups. Graduate students can effectively learn generalizations of finite field ideas. We use Haar measure on the absolute Galois group to replace counting arguments. New Chebotarev density variants interpret diophantine properties. Here we have the only complete treatment of Galois stratifications, used by Denef and Loeser, et al, to study Chow motives of Diophantine statements.Progress from the fi

  20. Discussion of “Geology and diamond distribution of the 140/141 kimberlite, Fort à la Corne, central Saskatchewan, Canada”, by A. Berryman, B.H. Scott-Smith and B.C. Jellicoe (Lithos v. 76, p. 99 114)

    Science.gov (United States)

    Kjarsgaard, Bruce A.; Leckie, Dale A.; Zonneveld, John-Paul

    2007-09-01

    A wide variety of geological data and geological observations by numerous geoscientists do not support a two-stage crater excavation and in-fill model, or a champagne glass-shaped geometry for the 169 or 140/141 kimberlite bodies in the Fort à la Corne kimberlite field, Saskatchewan as described by Berryman, A., Scott Smith, B.H., Jellicoe, B., (2004). Rather, these kimberlite bodies are best described as polygenetic kimberlite tephra cones and tuff rings with associated feeder vents of variable geometry as shown by previous workers for the 169 kimberlite, the 140/141 kimberlite and the Star kimberlite. The domal tephra cone geometry is preserved due to burial by conformable Cretaceous marine mudstones and siltstones and is not an artifact of Quaternary glacial processes.

  1. Field Notes

    Data.gov (United States)

    US Agency for International Development — This is a mobile application for capturing images , data, and geolocation for USAID projects in the field. The data is then stored on a server in AllNet. The...

  2. Field Demonstration of Aviation Turbine Fuel MIL-T-83133C, Grade JP-8 (NATO Code F-34), at Fort Bliss, TX

    Science.gov (United States)

    1992-09-01

    Howitzer. SYP, MI09A2, M109A3 8 L Tank. Combat MIAI 9 Cavalry Fighting Vehicle M3 10 Truck. Carlo . 2-1/2 Ton M35AI, M35A2. M35A2C. M36A2 21 Carrier. C.P...Southwest Research Institute, San Antonio, TX, January 1985. 12. A.F. Montemayor , L.L. Stavinoha, and S.J. Lestz, "Potential Benefits from the Use of JP

  3. Archive of single-beam bathymetry data collected during USGS cruise 07CCT01 nearshore of Fort Massachusetts and within Camille Cut, West and East Ship Islands, Gulf Islands National Seashore, Mississippi, July 2007

    Science.gov (United States)

    DeWitt, Nancy T.; Flocks, James G.; Reynolds, B.J.; Hansen, Mark

    2012-01-01

    The Gulf Islands National Seashore (GUIS) is composed of a series of barrier islands along the Mississippi - Alabama coastline. Historically these islands have undergone long-term shoreline change. The devastation of Hurricane Katrina in 2005 prompted questions about the stability of the barrier islands and their potential response to future storm impacts. Additionally, there was concern from the National Park Service (NPS) about the preservation of the historical Fort Massachusetts, located on West Ship Island. During the early 1900s, Ship Island was an individual island. In 1969 Hurricane Camille breached Ship Island, widening the cut and splitting it into what is now known as West Ship Island and East Ship Island. In July of 2007, the U.S. Geological Survey (USGS) was able to provide the NPS with a small bathymetric survey of Camille Cut using high-resolution single-beam bathymetry. This provided GUIS with a post-Katrina assessment of the bathymetry in Camille Cut and along the northern shoreline directly in front of Fort Massachusetts. Ultimately, this survey became an initial bathymetry dataset toward a larger USGS effort included in the Northern Gulf of Mexico (NGOM) Ecosystem Change and Hazard Susceptibility Project (http://ngom.usgs.gov/gomsc/mscip/). This report serves as an archive of the processed single-beam bathymetry. Data products herein include gridded and interpolated digital depth surfaces and x,y,z data products. Additional files include trackline maps, navigation files, geographic information system (GIS) files, Field Activity Collection System (FACS) logs, and formal Federal Geographic Data Committee (FGDC) metadata. Scanned images of the handwritten FACS logs and digital FACS logs are also provided as PDF files. Refer to the Acronyms page for description of acronyms and abbreviations used in this report or hold the cursor over an acronym for a pop-up explanation. The USGS St. Petersburg Coastal and Marine Science Center assigns a unique

  4. Fort Yukon, Alaska DOE Implementation Grant Gwich'in Solar and Energy Efficiency in the Arctic Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Cadzow, Janet [Gwichyaa Zhee Gwich' in Tribal Government, Fort Yukon, AK (United States); Messier, Dave [Gwichyaa Zhee Gwich' in Tribal Government, Fort Yukon, AK (United States)

    2017-01-30

    Gwichyaa Zhee Gwich’in Tribal Government (GZGTG) applied for funding in 2014 under the U.S. Department of Energy Office of Indian Energy Deployment of Clean Energy on Tribal Lands funding opportunity. They were awarded 50% of the project costs for the construction of an 18kW, grid-tied solar PV array on the fort Yukon Tribal Hall, the construction of a 3kW solar PV array on the tribally owned greenhouse, the replacement of inefficient florescent lighting fixtures in the tribal hall to higher efficiency LED lights and the addition of blow in cellulose insulation to the attic of the tribal hall to assist with heat retention. Total DOE Funding for the project was $124,735. Total GZGTG funding for the project was $133,321 for a total project cost of $258,056. The Project was completed with 100% local labor on the tribal hall solar PV installation, the LED lighting retrofit and the insulation on the tribal hall. Based on the results at the tribal hall/office, the tribe also used their own tribal funding to retrofit the lighting in the community hall from florescent to LED lights. The resulting project was completed by the end of Sept 2016 and results have shown a decrease in fuel used at the tribal hall/office of 35% and a decrease in electric costs at the tribal hall of 68%. The total energy costs before the project were approximately $28,000 a year and the energy equivalent of 385 MMBTU/yr. After the project the total energy costs decreased to $11,200/yr. and an energy equivalent of only 242 MMBTU. This represents an overall decrease in energy use of 38%. All in all the tribe and the community regard this project as a huge success!

  5. Overcoming cross-gender differences and challenges in Le Fort-based, craniomaxillofacial transplantation with enhanced computer-assisted technology.

    Science.gov (United States)

    Gordon, Chad R; Swanson, Edward W; Susarla, Srinivas M; Coon, Devin; Rada, Erin; Rakan, Mohammed Al; Santiago, Gabriel F; Shores, Jaimie T; Bonawitz, Steven C; Fishman, Elliot K; Murphy, Ryan; Armand, Mehran; Liacouras, Peter; Grant, Gerald T; Brandacher, Gerald; Lee, Wei-Ping Andrew

    2013-10-01

    Sex-specific anthropometrics, skin texture/adnexae mismatch, and social apprehension have prevented cross-gender facial transplantation from evolving. However, the scarce donor pool and extreme waitlist times are currently suboptimal. Our objective was to (1) perform and assess cadaveric facial transplantation for each sex-mismatched scenario using virtual planning with cutting guide fabrication and (2) review the advantages/disadvantages of cross-gender facial transplantation. Cross-gender facial transplantation feasibility was evaluated through 2 mock, double-jaw, Le Fort-based cadaveric allotransplants, including female donor-to-male recipient and male donor-to-female recipient. Hybrid facial-skeletal relationships were investigated using cephalometric measurements, including sellion-nasion-A point and sellion-nasion-B point angles, and lower-anterior-facial-height to total-anterior-facial-height ratio. Donor and recipient cutting guides were designed with virtual planning based on our team's experience in swine dissections and used to optimize the results. Skeletal proportions and facial-aesthetic harmony of the transplants (n = 2) were found to be equivalent to all reported experimental/clinical sex-matched cases by using custom guides and Mimics technology. Cephalometric measurements relative to Eastman Normal Values are shown. On the basis of our results, we believe that cross-gender facial transplantation can offer equivalent, anatomical skeletal outcomes to those of sex-matched pairs using preoperative planning and custom guides for execution. Lack of literature discussion of cross-gender facial transplantation highlights the general stigmata encompassing the subject. We hypothesize that concerns over sex-specific anthropometrics, skin texture/adnexae disparity, and increased immunological resistance have prevented full acceptance thus far. Advantages include an increased donor pool with expedited reconstruction, as well as size-matched donors.

  6. Evaluation of Codisposal Viability for TH/U Carbide (Fort Saint Vrain HTGR) DOE-Owned Fuel

    Energy Technology Data Exchange (ETDEWEB)

    H. radulescu

    2001-09-28

    There are more than 250 forms of US Department of Energy (DOE)-owned spent nuclear fuel (SNF). Due to the variety of the spent nuclear fuel, the National Spent Nuclear Fuel Program has designated nine representative fuel groups for disposal criticality analyses based on fuel matrix, primary fissile isotope, and enrichment. The Fort Saint Vrain reactor (FSVR) SNF has been designated as the representative fuel for the Th/U carbide fuel group. The FSVR SNF consists of small particles (spheres of the order of 0.5-mm diameter) of thorium carbide or thorium and high-enriched uranium carbide mixture, coated with multiple, thin layers of pyrolytic carbon and silicon carbide, which serve as miniature pressure vessels to contain fission products and the U/Th carbide matrix. The coated particles are bound in a carbonized matrix, which forms fuel rods or ''compacts'' that are loaded into large hexagonal graphite prisms. The graphite prisms (or blocks) are the physical forms that are handled in reactor loading and unloading operations, and which will be loaded into the DOE standardized SNF canisters. The results of the analyses performed will be used to develop waste acceptance criteria. The items that are important to criticality control are identified based on the analysis needs and result sensitivities. Prior to acceptance to fuel from the Th/U carbide fuel group for disposal, the important items for the fuel types that are being considered for disposal under the Th/U carbide fuel group must be demonstrated to satisfy the conditions determined in this report.

  7. Field theories with subcanonical fields

    International Nuclear Information System (INIS)

    Bigi, I.I.Y.

    1976-01-01

    The properties of quantum field theories with spinor fields of dimension less than the canonical value of 3/2 are studied. As a starting point for the application of common perturbation theory we look for the linear version of these theories. A gange-interaction is introduced and with the aid of power counting the renormalizability of the theory is shown. It follows that in the case of a spinor-field with negative dimension renormalization can only be attained if the interaction has a further symmetry. By this symmetry the theory is determined in an unequivocal way. The gange-interaction introduced in the theory leads to a spontaneous breakdown of scale invariance whereby masses are produced. At the same time the spinor-field operators can now be separated in two orthogonal sections with opposite norm. It is proposed to use the section with negative (positive) norm to describe hadrons (leptons) respectively. (orig./WL) [de

  8. Assessment of Soil-Gas, Surface-Water, and Soil Contamination at the Installation Railhead, Fort Gordon, Georgia, 2008-2009

    Science.gov (United States)

    Landmeyer, James E.; Harrelson, Larry G.; Ratliff, W. Hagan; Wellborn, John B.

    2010-01-01

    The U.S. Geological Survey, in cooperation with the U.S. Department of the Army Environmental and Natural Resources Management Office of the U.S. Army Signal Center and Fort Gordon, assessed soil gas, surface water, and soil for contaminants at the Installation Railhead (IR) at Fort Gordon, Georgia, from October 2008 to September 2009. The assessment included delineation of organic contaminants present in soil-gas samples beneath the IR, and in a surface-water sample collected from an unnamed tributary to Marcum Branch in the western part of the IR. Inorganic contaminants were determined in a surface-water sample and in soil samples. This assessment was conducted to provide environmental contamination data to Fort Gordon personnel pursuant to requirements of the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process. Soil-gas samples collected within a localized area on the western part of the IR contained total petroleum hydrocarbons; benzene, toluene, ethylbenzene, and total xylenes (referred to as BTEX); and naphthalene above the method detection level. These soil-gas samples were collected where buildings had previously stood. Soil-gas samples collected within a localized area contained perchloroethylene (PCE). These samples were collected where buildings 2410 and 2405 had been. Chloroform and toluene were detected in a surface-water sample collected from an unnamed tributary to Marcum Branch but at concentrations below the National Primary Drinking Water Standard maximum contaminant level (MCL) for each compound. Iron was detected in the surface-water sample at 686 micrograms per liter (ug/L) and exceeded the National Secondary Drinking Water Standard MCL for iron. Metal concentrations in composite soil samples collected at three locations from land surface to a depth of 6 inches did not exceed the U.S. Environmental Protection Agency Regional Screening Levels for industrial soil.

  9. Stability of the anterior maxillary segment and teeth after segmental le fort I osteotomy and postoperative skeletal elastic fixation with or without occlusal splint.

    Science.gov (United States)

    Blæhr, Tue Lindberg; Jensen, Thomas; Due, Karen Margrethe; Neumann-Jensen, Bjarne

    2014-07-01

    To assess the short term dental and skeletal stability of the anterior maxillary segment after segmental Le Fort I osteotomy with postoperative skeletal elastic fixation with or without occlusal splint. 29 consecutive patients underwent segmental Le Fort I osteotomy and elastic skeletal fixation was applied. Patients were divided into two groups according to whether a fixed occlusal splint was used for six weeks (group A) or dismounted perioperatively (group B). Changes in landmarks and reference planes between the two timepoints were estimated on lateral cephalometric radiographs. The upper incisor had a mean intrusion of -0.56 mm (SD 0.77; range -2.04 to 1.08 mm) and a mean posterior movement of -0.93 mm (SD 1.03; range -2.52 to 0.96 mm). The mean change in the axial inclination of the upper incisor was -0.33° (SD 2.56; range -6° to 4°) (95% CI: -1.75 to 1.08°). Group B: The upper incisor had a mean intrusion of -0.13 mm (SD 1.36; range -1.92 to 3.6 mm) and a mean anterior movement of 0.11 mm (SD 1.78; range -2.88 to 3.84 mm). The mean change in the axial inclination of the upper incisor was -0.07° (SD 3.05; range -5° to 5°) (95% CI: -1.83 to 1.69°). There was no statistically significant difference in stability between the two groups at the P value 0.05. The skeletal anterior fixation with postoperative elastics for eight weeks may not compromise the early postoperative dental and skeletal stability of the anterior segment in segmental Le Fort I osteotomy.

  10. Stability of the Anterior Maxillary Segment and Teeth after Segmental Le Fort I Osteotomy and Postoperative Skeletal Elastic Fixation With or Without Occlusal Splint

    Directory of Open Access Journals (Sweden)

    Tue Lindberg

    2014-10-01

    Full Text Available Objectives: To assess the short term dental and skeletal stability of the anterior maxillary segment after segmental Le Fort I osteotomy with postoperative skeletal elastic fixation with or without occlusal splint. Material and Methods: 29 consecutive patients underwent segmental Le Fort I osteotomy and elastic skeletal fixation was applied. Patients were divided into two groups according to whether a fixed occlusal splint was used for six weeks (group A or dismounted perioperatively (group B. Changes in landmarks and reference planes between the two timepoints were estimated on lateral cephalometric radiographs. Results: Group A: The upper incisor had a mean intrusion of -0.56 mm (SD 0.77; range -2.04 to 1.08 mm and a mean posterior movement of -0.93 mm (SD 1.03; range -2.52 to 0.96 mm. The mean change in the axial inclination of the upper incisor was -0.33° (SD 2.56; range -6° to 4° (95% CI: -1.75 to 1.08°. Group B: The upper incisor had a mean intrusion of -0.13 mm (SD 1.36; range -1.92 to 3.6 mm and a mean anterior movement of 0.11 mm (SD 1.78; range -2.88 to 3.84 mm. The mean change in the axial inclination of the upper incisor was -0.07° (SD 3.05; range -5° to 5° (95% CI: -1.83 to 1.69°. There was no statistically significant difference in stability between the two groups at the P value 0.05. Conclusions: The skeletal anterior fixation with postoperative elastics for eight weeks may not compromise the early postoperative dental and skeletal stability of the anterior segment in segmental Le Fort I osteotomy.

  11. gauge fields

    Indian Academy of Sciences (India)

    Abstract. Painlevé test (Jimbo et al [1]) for integrability for the Yang's self-dual equa- tions for SU(2) gauge fields has been revisited. Jimbo et al analysed the complex form of the equations with a rather restricted form of singularity manifold. They did not discuss exact solutions in that context. Here the analysis has been done ...

  12. Fields Medallists

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 4; Issue 11. Fields Medallists - Curtis T. McMullen. Nimish A Shah. Research News Volume 4 Issue 11 November 1999 pp 80-83. Fulltext. Click here to view fulltext PDF. Permanent link: http://www.ias.ac.in/article/fulltext/reso/004/11/0080-0083 ...

  13. Feasibility Study for Utilizing Dredged Material from Norfolk Harbor Deepening for Beach Fill: Fort Story at Cape Henry, Virginia Beach, Virginia.

    Science.gov (United States)

    1984-06-01

    25 percent of the core length above -55 feet MLW. Fine sediments ( clay ~and silt) are predominant, but sands occur over an extensive and contiguous...appreciably coarser, but overdredging would provide undesirable silt and clay in the region of the extension. 68 TABSLO PM- C0MpOTAwnarJS iqtrDN4q...50,000 FZE7 /-’~76 ,f7 AAIP PFE -/C/o 86 APPENDIX D DESIGN OF BEACH FILL AT FORT STORY The purpose of this section is to present the prelimn- inary design

  14. Le traitement anti-VEGF des n?ovaisseaux choro?diens juxta-fov?olaires du fort myope: ? propos d?une observation

    OpenAIRE

    Moustaine, Moulay Omar; Dellali, Foued; Husseini, Abbas El; Hirsch, Anne-Lise

    2017-01-01

    Les n?ovaisseaux choro?diens constituent une complication redoutable de la forte myopie rapport?e dans 5 ? 10% des cas. Ils doivent ?tre pris en charge rapidement vu leur pronostic sombre. Les IVT des anti-VEGF constituent actuellement la nouvelle alternative th?rapeutique d?passant de loin la th?rapie photo-dynamique (PDT). N?anmoins l'algorithme th?rapeutique anti-VEGF devant ce type de n?ovaisseaux reste un sujet de discussion entre les auteurs. A travers cette observation on essaie d'illu...

  15. Geothermal Space Heating Applications for the Fort Peck Indian Reservation in the Vicinity of Poplar, Montana. Phase I Report, August 20, 1979--December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Spencer, Glenn J.; Cohen, M. Jane

    1980-01-04

    This engineering and economic study is concerned with the question of using the natural heat of the earth, or geothermal energy, as an alternative to other energy sources such as oil and natural gas which are increasing in cost. This document represents a quarterly progress report on the effort directed to determine the availability of geothermal energy within the Fort Peck Indian Reservation, Montana (Figure 1), and the feasibility of beneficial use of this resource including engineering, economic and environmental considerations. The project is being carried out by the Tribal Research office, Assinboine and Sioux Tribes, Fort Peck Indian Reservation, Poplar, Montana under a contract to the United States Department of Energy. PRC TOUPS, the major subcontractor, is responsible for engineering and economic studies and the Council of Energy Resource Tribes (CERT) is providing support in the areas of environment and finance, the results of which will appear in the Final Report. The existence of potentially valuable geothermal resource within the Fort Peck Indian Reservation was first detected from an analysis of temperatures encountered in oil wells drilled in the area. This data, produced by the Montana Bureau of Mines and Geology, pointed to a possible moderate to high temperature source near the town of Poplar, Montana, which is the location of the Tribal Headquarters for the Fort Peck Reservation. During the first phase of this project, additional data was collected to better characterize the nature of this geothermal resource and to analyze means of gaining access to it. As a result of this investigation, it has been learned that not only is there a potential geothermal resource in the region but that the producing oil wells north of the town of Poplar bring to the surface nearly 20,000 barrels a day (589 gal/min) of geothermal fluid in a temperature range of 185-200 F. Following oil separation, these fluids are disposed of by pumping into a deep groundwater

  16. An integrated paleomagnetic and diagenetic investigation of the Barnett shale and underlying Ellenburger Group carbonates, Fort Worth Basin, Texas

    Science.gov (United States)

    Dennie, Devin P.

    The Ordovician Ellenburger Group carbonates are extensively karsted and brecciated throughout portions of the western half of the Fort Worth Basin, Texas, where it underlies the Mississippian Barnett Shale gas reservoir and source rock. An integrated geochemical/petrographic, paleomagnetic and rock magnetic study was conducted to better understand the nature and timing of diagenetic events in the unit. Samples from three scribe oriented conventional drill cores of the uppermost Ellenburger Group carbonates were analyzed for their diagenetic and paleomagnetic properties. Thermal demagnetization of samples from both units reveals a low-temperature steeply downward viscous remanent magnetization (VRM) as well as several components that are removed at higher temperatures (200-540°C). The higher temperature components reside in magnetite and are interpreted as chemical remanent magnetizations (CRMs) based on low burial temperatures. The specimen directions are streaked from an easterly and shallow direction to a southerly and shallow direction. The modern VRM was used to orient the CRM data for one of the wells and to test the scribe orienting method. The results confirm that the streak of directions is real. The streak disappears when the directions are grouped by diagenetic facies. Specimens from clasts in the karst breccia facies contain a CRM with easterly declinations and shallow inclinations that fails a conglomerate test and has an Ordovician pole. A mixed dolomite-limestone with shale filled fracture facies contains a pole which falls off of but close to the Late Mississippian-Early Pennsylvanian part of the apparent polar wander path. A group of facies (crystalline dolomite, wavy bedded to argillaceous dolomite, mottled, burrowed dolomite with fine grained breccia facies, and clastic-rich peritidal carbonates) contains a Late Permian-Early Triassic CRM. Dolomites with vug-fill solution-reprecipitation features contain a Late Triassic-Jurassic CRM. The results

  17. Probability and volume of potential postwildfire debris flows in the 2012 High Park Burn Area near Fort Collins, Colorado

    Science.gov (United States)

    Verdin, Kristine L.; Dupree, Jean A.; Elliott, John G.

    2012-01-01

    This report presents a preliminary emergency assessment of the debris-flow hazards from drainage basins burned by the 2012 High Park fire near Fort Collins in Larimer County, Colorado. Empirical models derived from statistical evaluation of data collected from recently burned basins throughout the intermountain western United States were used to estimate the probability of debris-flow occurrence and volume of debris flows along the burned area drainage network and to estimate the same for 44 selected drainage basins along State Highway 14 and the perimeter of the burned area. Input data for the models included topographic parameters, soil characteristics, burn severity, and rainfall totals and intensities for a (1) 2-year-recurrence, 1-hour-duration rainfall (25 millimeters); (2) 10-year-recurrence, 1-hour-duration rainfall (43 millimeters); and (3) 25-year-recurrence, 1-hour-duration rainfall (51 millimeters). Estimated debris-flow probabilities along the drainage network and throughout the drainage basins of interest ranged from 1 to 84 percent in response to the 2-year-recurrence, 1-hour-duration rainfall; from 2 to 95 percent in response to the 10-year-recurrence, 1-hour-duration rainfall; and from 3 to 97 in response to the 25-year-recurrence, 1-hour-duration rainfall. Basins and drainage networks with the highest probabilities tended to be those on the eastern edge of the burn area where soils have relatively high clay contents and gradients are steep. Estimated debris-flow volumes range from a low of 1,600 cubic meters to a high of greater than 100,000 cubic meters. Estimated debris-flow volumes increase with basin size and distance along the drainage network, but some smaller drainages were also predicted to produce substantial volumes of material. The predicted probabilities and some of the volumes predicted for the modeled storms indicate a potential for substantial debris-flow impacts on structures, roads, bridges, and culverts located both within and

  18. Simulation of Ground-Water Flow in the Irwin Basin Aquifer System, Fort Irwin National Training Center, California

    Science.gov (United States)

    Densmore, Jill N.

    2003-01-01

    Ground-water pumping in the Irwin Basin at Fort Irwin National Training Center, California resulted in water-level declines of about 30 feet from 1941 to 1996. Since 1992, artificial recharge from wastewater-effluent infiltration and irrigation-return flow has stabilized water levels, but there is concern that future water demands associated with expansion of the base may cause a resumption of water-level declines. To address these concerns, a ground-water flow model of the Irwin Basin was developed to help better understand the aquifer system, assess the long-term availability and quality of ground water, and evaluate ground-water conditions owing to current pumping and to plan for future water needs at the base. Historical data show that ground-water-level declines in the Irwin Basin between 1941 and 1996, caused the formation of a pumping depression near the pumped wells, and that recharge from the wastewater-treatment facility and disposal area caused the formation of a recharge mound. There have been two periods of water-level recovery in the Irwin Basin since the development of ground water in this basin; these periods coincide with a period of decreased pumpage from the basin and a period of increased recharge of water imported from the Bicycle Basin beginning in 1967 and from the Langford Basin beginning in 1992. Since 1992, artificial recharge has exceeded pumpage in the Irwin Basin and has stabilized water-level declines. A two-layer ground-water flow model was developed to help better understand the aquifer system, assess the long-term availability and quality of ground water, and evaluate ground-water conditions owing to current pumping and to plan for future water needs at the base. Boundary conditions, hydraulic conductivity, altitude of the bottom of the layers, vertical conductance, storage coefficient, recharge, and discharge were determined using existing geohydrologic data. Rates and distribution of recharge and discharge were determined from

  19. O Processo de Construção de uma Marca Forte que se Popularizou. O Caso Consul.

    Directory of Open Access Journals (Sweden)

    Onésimo Oliveira Cardoso

    2012-06-01

    Full Text Available Normal 0 21 false false false PT-BR X-NONE X-NONE MicrosoftInternetExplorer4 /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Tabela normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;} Este artigo tem como objetivo analisar o processo de construção de uma marca forte que se popularizou ao aproveitar uma oportunidade de negócio para expandir seu mercado, abordando o caso da marca Consul, pertencente ao Grupo Whirlpool. A metodologia consiste em um estudo de caso, no qual se checa um referencial teórico pré-existente com as informações obtidas em entrevistas qualitativas e levantamento bibliográfico. Constatou-se que a Consul se fortaleceu no mercado com produtos de qualidade, fáceis de usar, confiáveis e de preço acessível. O gerenciamento da marca é trabalhado de forma eficaz pela Whirlpool, que realiza periodicamente pesquisas de imagem de marca e lealdade do consumidor. Seu sucesso obtido ao lançar produtos direcionados ao consumidor de baixa renda reflete a preocupação da empresa em atender as necessidades do público-alvo.

  20. Did enhanced afforestation cause high severity peat burn in the Fort McMurray Horse River wildfire?

    Science.gov (United States)

    Wilkinson, S. L.; Moore, P. A.; Flannigan, M. D.; Wotton, B. M.; Waddington, J. M.

    2018-01-01

    Climate change mediated drying of boreal peatlands is expected to enhance peatland afforestation and wildfire vulnerability. The water table depth-afforestation feedback represents a positive feedback that can enhance peat drying and consolidation and thereby increase peat burn severity; exacerbating the challenges and costs of wildfire suppression efforts and potentially shifting the peatland to a persistent source of atmospheric carbon. To address this wildfire management challenge, we examined burn severity across a gradient of drying in a black spruce dominated peatland that was partially drained in 1975-1980 and burned in the 2016 Fort McMurray Horse River wildfire. We found that post-drainage black spruce annual ring width increased substantially with intense drainage. Average (±SD) basal diameter was 2.6 ± 1.2 cm, 3.2 ± 2.0 cm and 7.9 ± 4.7 cm in undrained (UD), moderately drained (MD) and heavily drained (HD) treatments, respectively. Depth of burn was significantly different between treatments (p < 0.001) and averaged (±SD) 2.5 ± 3.5 cm, 6.4 ± 5.0 cm and 36.9 ± 29.6 cm for the UD, MD and HD treatments, respectively. The high burn severity in the HD treatment included 38% of the treatment that experienced combustion of the entire peat profile, and we estimate that overall 51% of the HD pre-burn peat carbon stock was lost. We argue that the HD treatment surpassed an ecohydrological tipping point to high severity peat burn that may be identified using black spruce stand characteristics in boreal plains bogs. While further studies are needed, we believe that quantifying this threshold will aid in developing effective adaptive management techniques and protecting boreal peatland carbon stocks.

  1. Field theory

    CERN Multimedia

    1999-11-08

    In these lectures I will build up the concept of field theory using the language of Feynman diagrams. As a starting point, field theory in zero spacetime dimensions is used as a vehicle to develop all the necessary techniques: path integral, Feynman diagrams, Schwinger-Dyson equations, asymptotic series, effective action, renormalization etc. The theory is then extended to more dimensions, with emphasis on the combinatorial aspects of the diagrams rather than their particular mathematical structure. The concept of unitarity is used to, finally, arrive at the various Feynman rules in an actual, four-dimensional theory. The concept of gauge-invariance is developed, and the structure of a non-abelian gauge theory is discussed, again on the level of Feynman diagrams and Feynman rules.

  2. Field Report

    DEFF Research Database (Denmark)

    Gorm Hansen, Louise Lyngfeldt

    2012-01-01

    This field report expresses perfectly the kind of confusion almost all of us experience when entering the field. How do we know whether what we’re doing is “right” or not? What in particular should we record when we don’t have time to write down everything among all the myriad impressions thrusting...... themselves upon us in a new environment? What is this strange language that people in other walks of life take for granted, but which seems so alien to us as outsiders? And how on earth are we to interpret people’s contradictory remarks? This report will warn novices of what’s in store for them, as well...

  3. Sinus lifting before Le Fort I maxillary osteotomy: a suitable method for oral rehabilitation of edentulous patients with skelettal class-III conditions: review of the literature and report of a case

    Directory of Open Access Journals (Sweden)

    Meyer Ulrich

    2007-01-01

    Full Text Available Abstract Background Functional rehabilitation of patients afflicted with severe mandibular and maxillary alveolar atrophy might be challenging especially in malformed patients. Methods Treatment planning using sinus lifting and implant placement before Le Fort I maxillary osteotomy in a patient with severe mandibular and posterior maxillary alveolar atrophy and skelettal class-III conditions due to cleft palate are described. Results A full functional and esthetic rehabilitation of the patient was achieved by a stepwise surgical approach performed through sinus lifting as the primary approach followed by implant placement and subsequent Le Fort I maxillary osteotomy to correct the maxillo-mandibular relation. Conclusion Stabilisation of the maxillary complex by a sinus lifting procedure in combination with computer aided implant placement as preorthodontic planning procedure before Le Fort I maxillary osteotomy seems to be suitable in order to allow ideal oral rehabilitation especially in malformed patients.

  4. The study of the effectiveness and safety of vitamin-mineral complex «Focus Forte» for myopia treatment

    Directory of Open Access Journals (Sweden)

    E. Yu. Egorova

    2014-07-01

    Full Text Available Purpose: the estimation of the results of a randomized study of the effectiveness of vitamin-mineral complex «Focus Forte» at myopia.Methods: this study included 60 young patients (in age from 16 to18 years, university students, full-time education in the context of complex treatment within 2 months. Patients were randomized to receive the preparation (n=30 or into the control group (standard therapy, n=30. On the day «0» and the day «60» over 80 parameters of vision were measured using a special software package.Results: the comparisons of the studied parameters of vision on the day of «60» shown statistically significant differences in electrosen- sibility (O. R. 4.6, 95% C. I. 1.4-16, p=0,03, spatial contrast sensitivity (O. R. 9.0, 95% C. I. 1.5-17, p<0,006 and luminance sensitivity (O. R. 5.6, 95% DI 1.7-19; p=0,003 as well as a significant reduction of clinical symptoms of zinc deficiency and hypovitaminosеs A, C, E, B2 (p<0,001.Conclusion: «Focus Forte» helps to improve visual function among the students with myopia, helping to compensate for deficiency of vitamins and micronutrients, which is required for the physiological support of the molecular processes of vision.

  5. EXPERIENCE OF ORNITHINE ASPARTATE (HEPA-MERZ AND PROBIOTICS BIOFLORUM FORTE IN THE TREATMENT OF NON-SEVERE FORMS OF ALCOHOLIC AND NON-ALCOHOLIC FATTY LIVER DISEASE

    Directory of Open Access Journals (Sweden)

    L. Yu. Ilchenko

    2016-01-01

    Full Text Available Aim: to evaluate the efficacy and tolerability of ornithine aspartate, probiotic Bioflorum Forte and their combination with steatosis and steatohepatitis in patients  with alcohol and non-alcoholic  fatty  liver disease. Materials and methods.  An open, randomized,  comparative  clinical study, which included 30 outpatients and inpatients with a diagnosis of steatosis, steatohepatitis. We analyzed the clinical symptoms, functional state of the liver. With the help of questionnaires  (Grids LeGo and post intoxication alcohol syndrome have established the presence of chronic alcohol intoxication. Test transmissions of numbers used to characterize the cognitive function, as well as detection  of minimal hepatic encephalopathy. Quality of life was assessed by questionnaire for patients with chronic liver disease — CLDQ (The chronic liver disease questionnaire. The duration of treatment was4 weeks. Results: all three treatment regimens have demonstrated therapeutic  efficacy: clinical improvement, recovery of liver function and results in cognitive function. When combined therapy also produced a significant improvement  in patients’ quality of life. It is shown that  the safety and tolerability of the means employed, adverse events were not reported. Conclusion: the results obtained allow us to recommend the use of ornithine aspartate (Hepa-Merz, both as monotherapy and as part of complex therapy of steatosis,  steatohepatitis with probiotic Bioflorum Forte in patients with alcoholic and non-alcoholic fatty liver disease.

  6. Groundwater withdrawals 1976, 1990, and 2000--10 and land-surface-elevation changes 2000--10 in Harris, Galveston, Fort Bend, Montgomery, and Brazoria Counties, Texas

    Science.gov (United States)

    Kasmarek, Mark C.; Johnson, Michaela R.

    2013-01-01

    The study area comprising Harris County and parts of Galveston, Fort Bend, Montgomery, and Brazoria Counties in southeastern Texas forms part of one of the largest areas of land-surface-elevation change in the United States. Land-surface-elevation change in the study area primarily is caused by the withdrawal of groundwater. Groundwater withdrawn from the Chicot and Evangeline aquifers has been the primary source of water for municipal supply, industrial and commercial use, and irrigation in the study area. Groundwater withdrawals cause compaction of clay and silt layers abundant in the aquifers, which has in turn resulted in the widespread, substantial land-surface-elevation changes in the region with increased flooding. To estimate land-surface-elevation changes, the U.S. Geological Survey (USGS), in cooperation with the Harris-Galveston Subsidence District (HGSD), documented land-surface-elevation changes in the study area that occurred during 2000–10 and 2005–10 based on elevation data measured by 11 USGS borehole-extensometer sites, a National Geodetic Survey Continuously Operating Reference Station, and Global Positioning System Port-A-Measure (PAM) sites operated by the HGSD and the Fort Bend Subsidence District. Groundwater withdrawals in the study area also were documented for 1976, 1990, and 2000–10.

  7. Dynamic properties of Indiana, Fort Knox and Utah test range limestones and Danby Marble over the stress range 1 to 20 GPa

    Energy Technology Data Exchange (ETDEWEB)

    Furnish, M.D.

    1994-12-01

    The responses of the following carbonate materials to shock loading and release have been measured: Indiana limestone (18% porosity; saturated and dry), Jeffersonville/Louisville Limestones (Fort Knox limestone) (variable dolomitization, low porosity), Danby Marble (essentially pure calcite; low porosity), and a limestone from the Utah Test and Training Range (low porosity, with 22% silica). Various experimental configurations were used, some optimized to yield detailed waveform information, others to yield a clean combination of Hugoniot states and release paths. All made use of velocity interferometry as a primary diagnostic. The stress range of 0 - 20 GPa was probed (in most cases, emphasizing the stress range 0 -10 GPa). The primary physical processes observed in this stress regime were material strength, porosity, and polymorphic phase transitions between the CaCO{sub 3} phases I, II, III and VI. Hydration was also a significant reaction under certain conditions. The Indiana Limestone studies in particular represent a significant addition to the low-pressure database for porous limestone. Temperature dependence and the effect of freezing were assessed for the Fort Knox limestone. Experimental parameters and detailed results are provided for the 42 impact tests in this series.

  8. Field analysis

    Directory of Open Access Journals (Sweden)

    Waindok Andrzej

    2017-12-01

    Full Text Available Field analysis including eddy currents in the magnetic core of five-phase permanent magnet tubular linear actuator (TLA has been carried out. The eddy currents induced in the magnetic core cause the losses which have been calculated. The results from 2D finite element (FE analysis have been compared with those from 3D calculations. The losses in the mover of the five-phase actuator are much lower than the losses in its stator. That is why the former ones can be neglected in the computer aided designing. The calculation results have been verified experimentally

  9. Gauge fields

    International Nuclear Information System (INIS)

    Mills, R.

    1989-01-01

    This article is a survey of the history and ideas of gauge theory. Described here are the gradual emergence of symmetry as a driving force in the shaping of physical theory; the elevation of Noether's theorem, relating symmetries to conservation laws, to a fundamental principle of nature; and the force of the idea (''the gauge principle'') that the symmetries of nature, like the interactions themselves, should be local in character. The fundamental role of gauge fields in mediating the interactions of physics springs from Noether's theorem and the gauge principle in a remarkably clean and elegant way, leaving, however, some tantalizing loose ends that might prove to be the clue to a future deeper level of understanding. The example of the electromagnetic field as the prototype gauge theory is discussed in some detail and serves as the basis for examining the similarities and differences that emerge in generalizing to non-Abelian gauge theories. The article concludes with a brief examination of the dream of total unification: all the forces of nature in a single unified gauge theory, with the differences among the forces due to the specific way in which the fundamental symmetries are broken in the local environment

  10. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Fort Vancouver National Historic Site

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Schey; Jim Francfort

    2014-03-01

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect data to validate the use of advanced electric drive vehicle transportation. This report focuses on the Fort Vancouver National Historic Site (FVNHS) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of electric vehicles (EVs) into the agencies’ fleet. Individual observations of the selected vehicles provided the basis for recommendations related to EV adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles) could fulfill the mission requirements. FVNHS identified three vehicles in its fleet for consideration. While the FVNHS vehicles conduct many different missions, only two (i.e., support and pool missions) were selected by agency management to be part of this fleet evaluation. The logged vehicles included a pickup truck and a minivan. This report will show that BEVs and PHEVs are capable of performing the required missions and providing an alternative vehicle for both mission categories, because each has sufficient range for individual trips and time available each day for charging to accommodate multiple trips per day. These charging events could occur at the vehicle’s home base, high-use work areas, or in intermediate areas along routes that the vehicles frequently travel. Replacement of vehicles in the current fleet would result in

  11. Natural attenuation of chlorinated-hydrocarbon contamination at Fort Wainwright, Alaska; a hydrogeochemical and microbiological investigation workplan

    Science.gov (United States)

    McCarthy, Kathleen A.; Lilly, Michael R.; Braddock, Joan F.; Hinzman, Larry D.

    1998-01-01

    Natural attenuation processes include biological degradation, by which microorganisms break down contaminants into simpler product compounds; adsorption of contaminants to soil particles, which decreases the mass of contaminants dissolved in ground water; and dispersion, which decreases dissolved contaminant concentrations through dilution. The primary objectives of this study are to (1) assess the degree to which such natural processes are attenuating chlorinated-hydrocarbon contamination in ground water, and (2) evaluate the effects of ground-water/surface-water interactions on natural-attenuation processes in the area of the former East and West Quartermasters Fueling Systems for Fort Wainwright, Alaska. The study will include investigations of the hydrologic, geochemical, and microbiological processes occurring at this site that influence the transport and fate of chlorinated hydrocarbons in ground water. To accomplish these objectives, a data-collection program has been initiated that includes measurements of water-table elevations and the stage of the Chena River; measurements of vertical temperature profiles within the subsurface; characterization of moisture distribution and movement in the unsaturated zone; collection of ground-water samples for determination of both organic and inorganic chemical constituents; and collection of ground-water samples for enumeration of microorganisms and determination of their potential to mineralize contaminants. We will use results from the data-collection program described above to refine our conceptual model of hydrology and contaminant attenuation at this site. Measurements of water-table elevations and river stage will help us to understand the magnitude and direction of ground-water flow and how changes in the stage of the Chena River affect ground-water flow. Because ambient ground water and surface water typically have different temperature characteristics, temperature monitoring will likely provide further insight

  12. Dewatering of the Clayton Formation during construction of the Walter F George Lock and Dam, Fort Gaines, Clay County, Georgia

    Science.gov (United States)

    Stewart, J.W.

    1973-01-01

    Walter F. George Lock and Dam, the largest manmade structure in the South, extends over 2llz miles across the flood plain of the Chattahoochee River at Fort Gaines, Clay County, in southwest Georgia and in Henry County, in southeast Alabama. The multipurpose dam consists of two rolled-filled earth dikes, a concrete spillway, a single-stage lock with an 88-foot lift, and a 130,000 kilowatt capacity powerhouse. The foundation of the dam at the river is constructed in the Clayton Formation, and the earth dikes are constructed on river terraces at about 150 feet above msl (mean sea level). At the damsite, the top of the Clayton Formation consists of an "earthy" limestone, which is about 35 feet thick except in the river channel, where it is 12 to 15 feet thick; a "shell" limestone, which averages about 40 feet thick; and a basal "sandy" limestone, which averages about 35 feet thick. The Providence Sand underlies the "sandy" limestone and its thickness is about 175 feet at the damsite. These formations contain water under artesian conditions. The "shell" unit of the Clayton was the principal water-bearing formation pumped during construction of the lock and dam. The large yields of the wells from concentrated areas over extended periods of time indicate that in the vicinity of the Chattahoochee River, the Clayton Formation is a productive aquifer with transmissivity ranging from 48,000 to 77,000 gpd per ft. (gallons per day per foot) and storage coefficient ranging from 2.5 x 10?3 to 2.8 x 10?5. At the spillway site, pumpage ranged from an average of 1,700 to 8,400 gpm (gallons per minute) during the period April 1957 to July 1959; at the powerhouse site, pumpage ranged from 1,600 to 5,000 gpm during the period October 1957 to September 1961; and at the lock site, pumpage ranged from 4,000 to 5,000 gpm during the period July 1960 through December 1961. The large yields represent a source of large quantities of ground water available for industrial and other uses in an

  13. 4 Gy versus 24 Gy radiotherapy for patients with indolent lymphoma (FORT): a randomised phase 3 non-inferiority trial.

    Science.gov (United States)

    Hoskin, Peter J; Kirkwood, Amy A; Popova, Bilyana; Smith, Paul; Robinson, Martin; Gallop-Evans, Eve; Coltart, Stewart; Illidge, Timothy; Madhavan, Krishnaswamy; Brammer, Caroline; Diez, Patricia; Jack, Andrew; Syndikus, Isabel

    2014-04-01

    Follicular lymphoma has been shown to be highly radiosensitive with responses to doses as low as 4 Gy in two fractions. This trial was designed to explore the dose response for follicular lymphoma comparing 4 Gy in two fractions with 24 Gy in 12 fractions FORT is a prospective randomised, unblinded, phase 3 non-inferiority study comparing radiotherapy given as 4 Gy in two fractions with a standard dose of 24 Gy in 12 fractions. Entry criteria included all patients aged over 18 years, having local radiotherapy for radical or palliative local control, with follicular lymphoma or marginal zone lymphoma, who had received no previous treatment for at least 1 month before. The primary outcome was time to local progression analysed on an intention-to-treat basis. Randomisation was centralised through the Cancer Research UK and University College London Cancer Trials Centre. Radiotherapy target sites were randomised (1:1) with minimisation stratified by histology (follicular lymphoma vs marginal zone lymphoma), treatment intent (palliative or curative) and centre. This trial is registered with ClinicalTrials.gov number, NCT00310167. 299 sites were randomly assigned to 24 Gy and 315 sites to 4 Gy between April 7, 2006, and June 8, 2011, at 43 centres in the UK. After a median follow-up of 26 months (range 0·39-75·4), 91 local progressions had been recorded (21 in the 24 Gy group and 70 in the 4 Gy group). Time to local progression with 4 Gy was not non-inferior to 24 Gy (hazard ratio 3·42, 95% CI 2·09-5·55, p<0·0001). Eight (3%) of 282 patients in the 24 Gy group and four (1%) of 300 in the 4 Gy group had acute grade 3-4 toxic effects. Four (1%) patients in the 24 Gy group and four (1%) patients in the 4 Gy group had late toxic effects. Mucositis was the most common event in the 24 Gy group (two patients with acute mucositis and two with late mucositis; all grade 3) and was not reported in the 4 Gy group. The most common acute effect was pain at the site of

  14. Energy Audits of Boiler & Chiller Plants, Energy Engineering Analysis Program, Fort Bragg, North Carolina, Volume 1: Narrative Report

    National Research Council Canada - National Science Library

    1991-01-01

    .... Bragg, North Carolina. The purpose of this report is to indicate the work accomplished to date, show samples of field data collected, illustrate the methods and justifications of the approaches taken, outline the present...

  15. Field training

    International Nuclear Information System (INIS)

    Mumford, G.E.; Hadaway, E.H.

    1991-01-01

    Individualized, personal training can be used to increase an employee's awareness of the HSE program. Such training can stimulate personal commitment and provide personal skills that can be utilized for the benefit of the overall HSE effort. But, providing such training within our industry can be a difficult task due to the scheduling, travel arrangements, and cost associated with bringing employees from isolated, remote locations to centrally located training facilities. One method of overcoming these obstacles involves the use of field instructors to provide the training at the many, and varied number of individuals can be reached with minimal disruption to their work scheduling or to their time off. In fact, this type of on-site training is already used by some oil companies and drilling contractors with encouraging results. This paper describes one drilling contractor's experiences with such a training program. The results after eight years how that this program not only can provide and efficient, economical means of employee training, but also can have a direct application to employee motivation regarding a company's HSE effort

  16. Decision Document for the Storm Water Outfalls/Industrial Wastewater Treatment Plant, Pesticide Rinse Area, Old Fire Fighting Training Pit, Illicit PCB Dump Site, and the Battery Acid Pit Fort Lewis, Washington; FINAL

    International Nuclear Information System (INIS)

    Cantrell, Kirk J; Liikala, Terry L; Strenge, Dennis L; Taira, Randal Y

    2001-01-01

    PNNL conducted independent site evaluations for four sites at Fort Lewis, Washington, to determine their suitability for closure on behalf of the installation. These sites were recommended for ''No Further Action'' by previous investigators and included the Storm Water Outfalls/Industrial Waste Water Treatment Plant (IWTP), the Pesticide Rinse Area, the Old Fire Fighting Training Pit, and the Illicit PCB Dump Site

  17. Precipitation and streamflow data from the Fort Carson Military Reservation and precipitation, streamflow, and suspended-sediment data from the Piñon Canyon Maneuver Site, Southeastern Colorado, 2008-2012

    Science.gov (United States)

    Brown, Christopher R.

    2014-01-01

    In 2013, the U.S. Geological Survey (USGS), in cooperation with the U. S. Department of the Army, compiled available precipitation and streamflow data for the years of 2008–2012 from the Fort Carson Military Reservation (Fort Carson) near Colorado Springs, Colo., and precipitation, streamflow, and suspended-sediment loads from the Piñon Canyon Maneuver Site (PCMS) near Trinidad, Colo. Graphical representations of the data presented herein are a continuation of work completed by the USGS in 2008 to gain a better understanding of spatial and temporal trends within the hydrologic data. Precipitation stations at Fort Carson and the PCMS were divided into groups based on their land-surface altitude (LSA) to determine if there is a spatial difference in precipitation amounts based on LSA for either military facility. Two-sample t-tests and Wilcoxon rank-sum tests indicated statistically significant differences exist between precipitation values at different groups for Fort Carson but not for the PCMS. All five precipitation stations at Fort Carson exhibit a decrease in median daily total precipitation from years 2002–2007 to 2008–2012. For the PCMS, median precipitation values decreased from the first study period to the second for the 13 stations monitored year-round except for Burson and Big Hills. Mean streamflow for 2008–2012 is less than mean streamflow for 1983–2007 for all stream-gaging stations at Fort Carson and at the PCMS. During the study period, each of the stream-gaging stations within the tributary channels at the PCMS accounted for less than three percent of the total streamflow at the Purgatoire River at Rock Crossing gage. Peak streamflow for 2008–2012 is less than peak streamflow for 2002–2007 at both Fort Carson and the PCMS. At the PCMS, mean suspended-sediment yield for 2008–2012 increased by 54 percent in comparison to the mean yield for 2002–2007. This increase is likely related to the destruction of groundcover by a series of

  18. Les anomalies fortes et électromagnétiques dans les désintégrations faibles des mésons

    OpenAIRE

    Trine, Stéphanie

    2004-01-01

    Les effets des opérateurs liés aux anomalies axiale et de trace de QCD et de QED dans les désintégrations faibles des mésons sont analysés dans deux régimes extrêmes: tout d'abord lorsque les densités anomales de gluons et de photons sont générées à courte distance par une boucle de quark lourd, ensuite lorsqu'elles sont générées à longue distance par des corrections fortes associées aux quarks légers u, d et s. A courte distance, l'ensemble des corrections de type pingouin à une interacti...

  19. Le traitement anti-VEGF des néovaisseaux choroïdiens juxta-fovéolaires du fort myope: à propos d’une observation

    Science.gov (United States)

    Moustaine, Moulay Omar; Dellali, Foued; Husseini, Abbas El; Hirsch, Anne-Lise

    2017-01-01

    Les néovaisseaux choroïdiens constituent une complication redoutable de la forte myopie rapportée dans 5 à 10% des cas. Ils doivent être pris en charge rapidement vu leur pronostic sombre. Les IVT des anti-VEGF constituent actuellement la nouvelle alternative thérapeutique dépassant de loin la thérapie photo-dynamique (PDT). Néanmoins l'algorithme thérapeutique anti-VEGF devant ce type de néovaisseaux reste un sujet de discussion entre les auteurs. A travers cette observation on essaie d'illustrer la difficulté de prise en charge de ces néovaisseaux et de discuter le schéma thérapeutique Anti-VEGF à suivre. PMID:28491229

  20. Atitudes linguísticas e r-forte em Carambeí = Linguistics attitudes and strong-R in Carambeí

    Directory of Open Access Journals (Sweden)

    Letícia Fraga

    2009-04-01

    Full Text Available Considerando que o município de Carambeí é bastante complexo cultural e linguisticamente, este estudo pretende, de acordo com o método etnográfico: a fazer um levantamento das atitudes linguísticas que os ‘holandeses’ manifestam em relação às línguas holandesa e portuguesa; b analisar a variedade de português falada pelos‘holandeses’ de Carambeí no que diz respeito ao uso do r-forte; e c estabelecer que tipo de relação se dá entre atitudes linguísticas e uso de determinada variante de r-forte no português. No que diz respeito às atitudes em relação ao holandês, os Grupos 1M, 1F e2Fa manifestam atitudes positivas, ao passo que os Grupos 2M e 2Fb têm atitudes negativas, assim como os Grupos 3M e 3F. Já em relação ao português, a comunidade como um todo manifesta atitudes positivas. No que diz respeito ao uso de r-forte, os grupos 1M e 1F usam vibrante múltipla e tepe; o Grupo 2M também usa a vibrante e otepe; já o Grupo 2Fa usa somente vibrante e tepe e o Grupo 2Fb usa fricativa e vibrante. Os Grupos 3M e 3F usam somente fricativa. Enfim, pode-se dizer que determinadas atitudes contribuem para o uso de determinada variedade de r-forte.Considering that Carambeí Township is fairly complex, both culturally and linguistically, this study intends to: a survey the linguistic attitudes that the ‘Dutch’ reveal concerning the Dutch and Portuguese languages; b analyze the variety of Portuguese spoken by the ‘Dutch’ of Carambeí regarding the use of strong-R; c establish what sort of relationship takes place between linguistic attitudes and use of certain varieties of the strong-R in Portuguese. About the attitudes regarding the Dutch language, Groups 1M, 1F and 2Fa show positive attitudes, while Groups 2M, 2Fb, 3M and 3F show negative attitudes.Portuguese, on the other hand, elicits positive attitudes in the community as a whole. Regarding the use of strong-R, groups 1M and 1F use trill and tap; group 2M also

  1. Environmental radiation surveillance conducted in the vicinity of the Fort St. Vrain Nuclear Generating Station for the Public Service Company of Colorado

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1977-01-01

    During the second half of 1977 the Fort St. Vrain nuclear generating station operated as follows: for two days in July at an average power level of 16 MWe, for 13 days in August at an average power level of 42 MWe, for 23 days in September at an average power level of 76.5 MWe, for 30 days during October at an average power level of 102.7 MWe, for 16 days in November at an average power level of 113.6 MWe and was not critical during the month of December 1977. The environmental sampling included surface air, surface waters, sediments, soils, vegetation, milk, and beef from cattle grazing on the site. All radioactivity data were near background levels and near the minimum detactable activity (MDA) levels for each radionuclide and sample type

  2. High-power diode laser in the circumvestibular incision for Le Fort I osteotomy in orthognathic surgery: a prospective case series study.

    Science.gov (United States)

    Jaeger, Filipe; Chiavaioli, Gustavo Marques; de Toledo, Guilherme Lacerda; Freire-Maia, Belini; Amaral, Marcio Bruno Figueiredo; Mesquita, Ricardo Alves

    2018-01-01

    The incisions during orthognathic surgery are classically performed with conventional scalpel or electrocautery. Considering that the high-power diode laser surgery may provide advantages when compared to conventional incision techniques, the current study aimed to present a prospective case series of patients submitted to circumvestibular incision for Le Fort I osteotomy. Ten patients with dentofacial deformities who underwent to rapid assisted maxillary expansion or bimaxillary orthognathic surgery were enrolled in the study. All incisions were performed by a single surgeon using an 808-nm diode laser, with an optical fiber of 600 μm, at a power of 2.5 W, in a continuous-wave mode. The performance of the incision was evaluated by incision velocity, bleeding, edema, secondary infection, clinical healing, and pain. The velocity of the incision ranged from 0.10 to 0.20 mm/s (mean 0.13 ± 0.03 mm/s). Considering bleeding during the soft tissue incision, all surgeries were classified as absent bleeding. All patients presented a clinical healing of the surgical wound in a period that range from 3 to 5 weeks and experienced swelling during the follow-up period. On average, approximately 50% of the swelling had resolved after the third postoperative week, and 28.8% of swelling remained after 2 months after the surgery. The pain decreased after 2 and 3 days, and 90.0% of the patients reported no pain after 7 postoperative days. High-power diode laser is effective and safety during circumvestibular incisions for Le Fort I osteotomy in orthognathic surgery decreasing bleeding, surgery time, pain, and edema after orthognathic surgery.

  3. Quantification of Biogenic and Anthropogenic Hydrocarbons using a Commercial Gas Chromatograph - Ion Trap Mass Spectrometer at a Ground Site near Fort McKay, AB

    Science.gov (United States)

    Tokarek, T. W.; Osthoff, H. D.

    2014-12-01

    The extraction of fossil fuels from the Alberta oil sands has been the focus of considerable attention due to its association with sizeable emissions of a variety of atmospheric pollutants, the magnitude and impacts of which are currently poorly constrained by observations. In order to more reliably estimate the magnitude and impact of these emissions, an intensive air quality measurement campaign, called "Fort McMurray Oil Sands Strategic Investigation of Local Sources" (FOSSILS), was conducted in the summer of 2013 as part of the Alberta-Canada joint oil sands monitoring program (JOSM) to identify and quantify emissions and their transformations from the Alberta oil sands. The challenge is that the region is surrounded by boreal forest, which provides a substantial background of biogenic hydrocarbons during summer. In this presentation, measurements of volatile organic compounds (VOCs) at the AMS13 ground site near Fort McKay, Alberta, from Aug 17 to Sept 6, 2013 using a commercial Griffin 450 gas chromatograph equipped with ion trap mass spectrometric detection and Tenax preconcentration are described. The combination of retention information and electron impact mass spectral data allowed unambiguous identification and quantification of the major biogenic monoterpenes, e.g., α and β-pinene, limonene, camphene, and 3Δ-carene, and of many anthropogenically derived hydrocarbons. Mixing ratios of biogenic hydrocarbons varied with time of day, temperature, and solar radiation, with maxima typically occurring at night, rationalized by nocturnal mixing heights and low mixing ratios of the nocturnal oxidants ozone (O3) and the nitrate radical (NO3). In contrast, mixing ratios of anthropogenic VOCs, e.g., benzene, toluene, ethyl benzene, and o-, p-, and m-xylene (BTEX), strongly depended on meteorological conditions, i.e., local wind direction. During episodes with high BTEX abundance, many additional high molecular weight hydrocarbons were observed which were not

  4. An electric field in a gravitational field

    International Nuclear Information System (INIS)

    Harpaz, Amos

    2005-01-01

    The behaviour of an electric field in a gravitational field is analysed. It is found that due to the mass (energy) of the electric field, it is subjected to gravity and it falls in the gravitational field. This fall curves the electric field, a stress force (a reaction force) is created, and the interaction of this reaction force with the static charge gives rise to the creation of radiation

  5. Phase II Interim Report -- Assessment of Hydrocarbon Seepage Detection Methods on the Fort Peck Reservation, Northeast Montana

    Energy Technology Data Exchange (ETDEWEB)

    Monson, Lawrence M.

    2002-04-24

    The following work was performed: (1) collected reconnaissance micro-magnetic data and background field data for Area 1, (2) identified and collected soil sample data in three anomalous regions of Area 1, (3) sampled soils in Northwest Poplar Oil Field, (4) graphed, mapped, and interpreted all data areas listed above, (5) registered for the AAPG Penrose Conference on Hydrocarbon Seepage Mechanisms and Migration (postponed from 9/16/01 until 4/7/02 in Vancouver, B.C.). Results include the identification and confirmation of an oil and gas prospect in the northwest part of Area 1 and the verification of a potential shallow gas prospect in the West Poplar Area. Correlation of hydrocarbon micro-seepage to TM tonal anomalies needs further data analysis.

  6. Knowledge and understanding of dissolved solids in the Rio Grande–San Acacia, New Mexico, to Fort Quitman, Texas, and plan for future studies and monitoring

    Science.gov (United States)

    Moyer, Douglas; Anderholm, Scott K.; Hogan, James F.; Phillips, Fred M.; Hibbs, Barry J.; Witcher, James C.; Matherne, Anne Marie; Falk, Sarah E.

    2013-01-01

    Availability of water in the Rio Grande Basin has long been a primary concern for water-resource managers. The transport and delivery of water in the basin have been engineered by using reservoirs, irrigation canals and drains, and transmountain-water diversions to meet the agricultural, residential, and industrial demand. In contrast, despite the widespread recognition of critical water-quality problems, there have been minimal management efforts to improve water quality in the Rio Grande. Of greatest concern is salinization (concentration of dissolved solids approaching 1,000 mg/L), a water-quality problem that has been recognized and researched for more than 100 years because of the potential to limit both agricultural and municipal use. To address the issue of salinization, water-resource managers need to have a clear conceptual understanding of the sources of salinity and the factors that control storage and transport, identify critical knowledge gaps in this conceptual understanding, and develop a research plan to address these gaps and develop a salinity management program. In 2009, the U.S. Geological Survey (USGS) in cooperation with the U.S. Army Corps of Engineers (USACE), New Mexico Interstate Stream Commission (NMISC), and New Mexico Environment Department (NMED) initiated a project to summarize the current state of knowledge regarding the transport of dissolved solids in the Rio Grande between San Acacia, New Mexico, and Fort Quitman, Texas. The primary objective is to provide hydrologic information pertaining to the spatial and temporal variability present in the concentrations and loads of dissolved solids in the Rio Grande, the source-specific budget for the mass of dissolved solids transported along the Rio Grande, and the locations at which dissolved solids enter the Rio Grande. Dissolved-solids concentration data provide a good indicator of the general quality of surface water and provide information on the factors governing salinization within

  7. Internal split field generator

    Science.gov (United States)

    Thundat,; George, Thomas [Knoxville, TN; Van Neste, Charles W [Kingston, TN; Vass, Arpad Alexander [Oak Ridge, TN

    2012-01-03

    A generator includes a coil of conductive material. A stationary magnetic field source applies a stationary magnetic field to the coil. An internal magnetic field source is disposed within a cavity of the coil to apply a moving magnetic field to the coil. The stationary magnetic field interacts with the moving magnetic field to generate an electrical energy in the coil.

  8. Assessment of hyporheic zone, flood-plain, soil-gas, soil, and surface-water contamination at the Old Incinerator Area, Fort Gordon, Georgia, 2009-2010

    Science.gov (United States)

    Guimaraes, Wladmir B.; Falls, W. Fred; Caldwell, Andral W.; Ratliff, W. Hagan; Wellborn, John B.; Landmeyer, James E.

    2011-01-01

    The U.S. Geological Survey, in cooperation with the U.S. Department of the Army Environmental and Natural Resources Management Office of the U.S. Army Signal Center and Fort Gordon, Georgia, assessed the hyporheic zone, flood plain, soil gas, soil, and surface-water for contaminants at the Old Incinerator Area at Fort Gordon, from October 2009 to September 2010. The assessment included the detection of organic contaminants in the hyporheic zone, flood plain, soil gas, and surface water. In addition, the organic contaminant assessment included the analysis of explosives and chemical agents in selected areas. Inorganic contaminants were assessed in soil and surface-water samples. The assessment was conducted to provide environmental contamination data to the U.S. Army at Fort Gordon pursuant to requirements of the Resource Conservation and Recovery Act Part B Hazardous Waste Permit process. Total petroleum hydrocarbons were detected above the method detection level in all 13 samplers deployed in the hyporheic zone and flood plain of an unnamed tributary to Spirit Creek. The combined concentrations of benzene, toluene, ethylbenzene, and total xylene were detected at 3 of the 13 samplers. Other organic compounds detected in one sampler included octane and trichloroethylene. In the passive soil-gas survey, 28 of the 60 samplers detected total petroleum hydrocarbons above the method detection level. Additionally, 11 of the 60 samplers detected the combined masses of benzene, toluene, ethylbenzene, and total xylene above the method detection level. Other compounds detected above the method detection level in the passive soil-gas survey included octane, trimethylbenzene, perchlorethylene, and chloroform. Subsequent to the passive soil-gas survey, six areas determined to have relatively high contaminant mass were selected, and soil-gas samplers were deployed, collected, and analyzed for explosives and chemical agents. No explosives or chemical agents were detected above

  9. Qualidade de caqui 'Rama forte' após armazenamento refrigerado, influenciada pelos tratamentos 1-MCP e/ou CO2

    Directory of Open Access Journals (Sweden)

    João Peterson Pereira Gardin

    2012-12-01

    Full Text Available Avaliaram-se os efeitos dos tratamentos com CO2 e 1-MCP (1-metilciclopropeno sobre a adstringência (índice de tanino, firmeza da polpa e distúrbios da epiderme em caqui 'Rama Forte'. Frutos foram tratados com 1-MCP por 24 h, logo após a colheita e/ou com alto CO2 (70% por 24 ou 48 h, um dia após a colheita ou após o armazenamento refrigerado (AR. Os caquis foram armazenados sob atmosfera modificada a 0 ºC, por 45 dias, e a seguir mantidos a 23 ºC, por 9 dias. Frutos-controle (não tratados com 1-MCP nem com CO2 amoleceram em três dias e perderam aproximadamente 50% da adstringência em 6 dias após o AR. A exposição ao CO2 acelerou a redução da adstringência. Esse efeito do CO2 foi menor em frutos tratados com 1-MCP, especialmente quando o CO2 foi aplicado após o AR, por apenas 24 h. O tratamento com 1-MCP inibiu o amolecimento e a redução da adstringência, especialmente nos frutos não tratados com CO2. O amolecimento de frutos tratados com 1-MCP foi maior quando a exposição ao CO2 ocorreu antes do AR. A combinação dos tratamentos com 1-MCP e alto CO2 reduziu a incidência de podridões e manchas translúcidas, mas não alterou o desenvolvimento de pintas pretas ('estrias'. Os resultados indicam que é possível induzir perda da adstringência sem excessiva perda da firmeza da polpa de caquis 'Rama Forte' após o AR pela associação dos tratamentos com 1-MCP logo após a colheita e alto CO2 após o AR.

  10. Seabed ripple morphology and surficial sediment size at the SAX04 experiments near Fort Walton Beach, Florida, fall 2004

    Science.gov (United States)

    Hanes, Daniel M.; Erikson, Li H.; Lescinski, Jamie M.R.; Harney, Jodi N.; Carter, Carissa L.; Hatcher, Gerry A.; Lacy, Jessica R.; Rubin, David M.

    2007-01-01

    Data presented in this report originates from measurements obtained off the Florida coast (fig. 1) as part of the Sediment Acoustics Experiment (SAX04) and Ripples Department Research Initiative (DRI) (Office of Naval Research (ONR), Critical Benthic Environmental Processes and Modeling, Long Range BAA 04-001, Sept. 10, 2003). The aim of this document is to present methods employed to extract data and the resulting measured ripple characteristics (ripple height, wavelength, and orientation) and seabed grain sizes. Application and analysis of the data with respect to hydro- and morphodynamics will be addressed in subsequent reports. Sediment transport in the coastal region is a complex process involving interactions between flow dynamics, sediments, and bedforms. Sediment type and bed geometry directly influence entrainment of sediments into suspension, and at sites where ripples occur (sand formations on the order of several cm high and less than two meter long wavelengths), the understanding of ripple dynamics is an essential component in improving sediment transport models. To gain a better understanding and ability to predict sediment transport, a field study was undertaken to investigate morphology, orientation, and dynamics of ripples on the seafloor. The data obtained from the field campaign also supports an on-going effort to study the effects of ripples on low grazing acoustic penetration into sandy marine sediments for the detection of objects, such as mines (Jackson and others, 2002).

  11. The Soldier-Athlete Initiative: Program Evaluation of the Effectiveness of Athletic Trainers Compared to Musculoskeletal Action Teams in Initial Entry Training, Fort Leonard Wood, June 2010 - December 2011

    Science.gov (United States)

    2012-10-01

    P. Brukner. Risk factors for stress fractures. Sports Medicine. 28:91-122, 1999. 208. Sherwood , O.D. Relaxin’s physiological roles and other diverse...Church VA to evaluate the effectiveness of MATs and ATs using injury, attrition and fitness metrics. The project was reviewed by the AIPH Human Subject...data in the Directorate of Human Resources, Trainee Student Processing Branch at Fort Leonard Wood. Attrition was defined as discharge from service

  12. Field Bus Communications Network

    International Nuclear Information System (INIS)

    Kwon, Uk Hyeon; Kim, Hyeong Seok; Kim, Dong Seong

    2004-10-01

    This book is about field bus communications network, introducing data communications network, field bus for industry and standardization of communication protocol, basic of data communication about structure, local area network, introduction of field bus for industry like utility of field bus, profibus, foundation field bus, worldFIP, device net, inter bus, control net, P-net and SERCOS, evaluation of field bus performance including computer simulation tool, and network modeling, and field bus practice.

  13. “Quiero ser una máquina de escribir”: el Alfabeto Dactilar (2014 del artista, activista y poeta Cristian Forte como nuevo orden poético en el caos

    Directory of Open Access Journals (Sweden)

    Sandra Hettmann

    2016-10-01

    Full Text Available En un primer paso, el artículo presentará al poeta Cristian Forte para situar su trabajo artístico y, a la vez, esbozar la formación del Alfabeto Dactilar. En un segundo paso, se aclarará la afirmación de que el Alfabeto Dactilar constituye más bien un sistema para captar el flujo de apariencias de una obra literaria en sí. En este contexto, se esbozará una breve discusión sobre la dactiloscopia, las técnicas de control y poder. Por último, se discutirán dos poemas dactilares de Cristian Forte que se acaban de publicar. En el marco de las siguientes preguntas: ¿cómo aplicar lecturas y escrituras dactilares con el alfabeto?, y ¿en qué medida se establecen nuevos vínculos entre cuerpos, cosas y palabras?, se sitúa la hipótesis de que la dactiloscopia poética de Forte genera una novedosa literatura corporal y, al mismo tiempo, una visibilidad plástica que ponen en marcha una caligrafía del cuerpo íntegramente performativa y semánticamente transgresora.

  14. Low field scaling properties of high Tc superconductor glasses

    Science.gov (United States)

    Giovannella, C.; Fruchter, L.; Chappert, C.

    We show that the zero field cooling (ZFC) M/H curves of both the YBaCuO and the LaSrCuO granular superconductor glasses (SuG) are subjected to scaling when plotted against the reduced variable t/H1/ψ . The breaking of the scaling for too weak or too strong magnetic fields is discussed and justified by the introduction of a phenomenological fractal picture, describing the behaviour of the disordered intergranular junction network. Nous montrons que les courbes M/H caractéristiques des verres de supraconducteurs granulaires sont sujettes à une loi d'échelle lorsqu'elles sont tracées en fonction de la variable réduite t/H1/ψ. La brisure de la loi d'échelle pour des champs trop forts ou trop faibles est justifiée par l'introduction d'un modèle phénoménologique fractal capable de décrire le comportement d'un réseau désordonné des jonctions.

  15. Impacts of aircraft deicer and anti-icer runoff on receiving waters from Dallas/Fort Worth International Airport, Texas, USA

    Science.gov (United States)

    Corsi, S.R.; Harwell, G.R.; Geis, S.W.; Bergman, D.

    2006-01-01

    From October 2002 to April 2004, data were collected from Dallas/Fort Worth (DFW) International Airport (TX, USA) outfalls and receiving waters (Trigg Lake and Big Bear Creek) to document the magnitude and potential effects of aircraft deicer and anti-icer fluid (ADAF) runoff on water quality. Glycol concentrations at outfalls ranged from less than 18 to 23,800 mg/L, whereas concentrations in Big Bear Creek were less because of dilution, dispersion, and degradation, ranging from less than 18 to 230 mg/L. Annual loading results indicate that 10 and 35% of what was applied to aircraft was discharged to Big Bear Creek in 2003 and 2004, respectively. Glycol that entered Trigg Lake was diluted and degraded before reaching the lake outlet. Dissolved oxygen (DO) concentrations at airport outfalls sometimes were low (5.0 mg/L). Results of toxicity tests indicate that effects on Ceriodaphnia dubia, Pimephales promelas, and Selanastrum capricornutum are influenced by type IV ADAF (anti-icer), not just type I ADAF (deicer) as is more commonly assumed. ?? 2006 SETAC.

  16. Critical incident stress management (CISM) in support of special agents and other first responders responding to the Fort Hood shooting: summary and recommendations.

    Science.gov (United States)

    Strand, Russell; Felices, Karina; Williams, Kenneth

    2010-01-01

    On November 5, 2009, an individual entered the Fort Hood Soldier Readiness Processing (SRP) site and opened fire with a handgun. The result of the shooting was a total of 13 people killed and 31 wounded. A two-person critical incident peer support (CIPS) team from the United States Army Military Police School (USAMPS) provided critical incident stress management (CISM) in the forms of critical incident stress debriefings (CISD) and one-on-one crisis intervention for investigators and their spouses. This article provides a summary and discussion of the results of the interventions that were conducted. Key results for successful CISM were accessibility of CIPS team, the credibility of trained peers and the development of supportive relationships, the reduction of stigma by requiring attendance at interventions, and the commitment of the CIPS team to the principles of CISM (e.g., homogenous groups, utilizing a multicomponent approach, and facilitating the normalization of emotional reactions to the crisis). Recommendations include mandating critical incident peer support cells for Criminal Investigation Division (CID) units, Director of Emergency Services (DES) on military installations, and Military Police units; providing a pool of trained peers in the above-mentioned organizations; providing permanent funding for USAMPS' CIPS Course; and recognition of CIPS/CISMas an essential element of Comprehensive Soldier Fitness and Army Human Capital in promoting Soldier Family, and Civilian well-being and resiliency. This article would benefit leaders, chaplains, mental health professionals, and emergency services personnel in investigative, operational, and U.S. Army Garrison units.

  17. Atmospheric Boundary Layer Wind Data During the Period January 1, 1998 Through January 31, 1999 at the Dallas-Fort Worth Airport. Volume 1; Quality Assessment

    Science.gov (United States)

    Zak, J. Allen; Rodgers, William G., Jr.

    2000-01-01

    The quality of the Aircraft Vortex Spacing System (AVOSS) is critically dependent on representative wind profiles in the atmospheric boundary layer. These winds observed from a number of sensor systems around the Dallas-Fort Worth airport were combined into single vertical wind profiles by an algorithm developed and implemented by MIT Lincoln Laboratory. This process, called the AVOSS Winds Analysis System (AWAS), is used by AVOSS for wake corridor predictions. During times when AWAS solutions were available, the quality of the resultant wind profiles and variance was judged from a series of plots combining all sensor observations and AWAS profiles during the period 1200 to 0400 UTC daily. First, input data was evaluated for continuity and consistency from criteria established. Next, the degree of agreement among all wind sensor systems was noted and cases of disagreement identified. Finally, the resultant AWAS solution was compared to the quality-assessed input data. When profiles differed by a specified amount from valid sensor consensus winds, times and altitudes were flagged. Volume one documents the process and quality of input sensor data. Volume two documents the data processing/sorting process and provides the resultant flagged files.

  18. Procedure for calculating estimated ultimate recoveries of wells in the Mississippian Barnett Shale, Bend Arch–Fort Worth Basin Province of north-central Texas

    Science.gov (United States)

    Leathers-Miller, Heidi M.

    2017-11-28

    In 2015, the U.S. Geological Survey published an assessment of technically recoverable continuous oil and gas resources of the Mississippian Barnett Shale in the Bend Arch–Fort Worth Basin Province of north-central Texas. Of the two assessment units involved in the overall assessment, one included a roughly equal number of oil wells and gas wells as classified by the U.S. Geological Survey’s standard of gas wells having production greater than or equal to 20,000 cubic feet of gas per barrel of oil and oil wells having production less than 20,000 cubic feet of gas per barrel of oil. As a result, estimated ultimate recoveries (EURs) were calculated for both oil wells and gas wells in one of the assessment units. Generally, only gas EURs or only oil EURs are calculated for an assessment unit. These EURs were calculated with data from IHS MarkitTM using DeclinePlus software in the Harmony interface and were a major component of the quantitative resource assessment. The calculated mean EURs ranged from 235 to 2,078 million cubic feet of gas and 21 to 39 thousand barrels of oil for various subsets of wells.

  19. Quantized fields in external field. Pt. 2

    International Nuclear Information System (INIS)

    Bellissard, J.

    1976-01-01

    The case of a charged scalar field is considered first. The existence of the corresponding Green's functions is proved. For weak fields, as well as pure electric or scalar external fields, the Bogoliubov S-operator is shown to be unitary, covariant, causal up-to-a-phase. These results are generalised to a class of higher spin quantized fields, 'nicely' coupled to external fields, which includes the Dirac theory, and in the case of minimal and magnetic dipole coupling, the spin one Petiau-Duffin-Kemmer theory. (orig.) [de

  20. Cosmological magnetic fields - V

    Indian Academy of Sciences (India)

    Introduction. Magnetic fields seem to be everywhere that we can look in the universe, from our own sun out to high-redshift Lyman-« systems. The fields we ... is the field tensor, is the four-potential, and В is the four-current. The field tensor is observer-independent, while the electric and magnetic fields depend on the ...

  1. Hydrometeorological conditions preceding wildfire, and the subsequent burning of a fen watershed in Fort McMurray, Alberta, Canada

    Science.gov (United States)

    Elmes, Matthew C.; Thompson, Dan K.; Sherwood, James H.; Price, Jonathan S.

    2018-01-01

    The destructive nature of the ˜ 590 000 ha Horse river wildfire in the Western Boreal Plain (WBP), northern Alberta, in May of 2016 motivated the investigation of the hydrometeorological conditions that preceded the fire. Historical climate and field hydrometeorological data from a moderate-rich fen watershed were used to (a) identify whether the spring 2016 conditions were outside the range of natural variability for WBP climate cycles, (b) explain the observed patterns in burn severity across the watershed, and (c) identify whether fall and winter moisture signals observed in peatlands and lowland forests in the region are indicative of wildfire. Field hydrometeorological data from the fen watershed confirmed the presence of cumulative moisture deficits prior to the fire. Hydrogeological investigations highlighted the susceptibility of fen and upland areas to water table and soil moisture decline over rain-free periods (including winter), due to the watershed's reliance on supply from localized flow systems originating in topographic highs. Subtle changes in topographic position led to large changes in groundwater connectivity, leading to greater organic soil consumption by fire in wetland margins and at high elevations. The 2016 spring moisture conditions measured prior to the ignition of the fen watershed were not illustrated well by the Drought Code (DC) when standard overwintering procedures were applied. However, close agreement was found when default assumptions were replaced with measured duff soil moisture recharge and incorporated into the overwintering DC procedure. We conclude that accumulated moisture deficits dating back to the summer of 2015 led to the dry conditions that preceded the fire. The infrequent coinciding of several hydrometeorological conditions, including low autumn soil moisture, a modest snowpack, lack of spring precipitation, and high spring air temperatures and winds, ultimately led to the Horse river wildfire spreading widely and

  2. How fields vary.

    Science.gov (United States)

    Krause, Monika

    2018-03-01

    Field theorists have long insisted that research needs to pay attention to the particular properties of each field studied. But while much field-theoretical research is comparative, either explicitly or implicitly, scholars have only begun to develop the language for describing the dimensions along which fields can be similar to and different from each other. In this context, this paper articulates an agenda for the analysis of variable properties of fields. It discusses variation in the degree but also in the kind of field autonomy. It discusses different dimensions of variation in field structure: fields can be more or less contested, and more or less hierarchical. The structure of symbolic oppositions in a field may take different forms. Lastly, it analyses the dimensions of variation highlighted by research on fields on the sub- and transnational scale. Post-national analysis allows us to ask how fields relate to fields of the same kind on different scales, and how fields relate to fields on the same scale in other national contexts. It allows us to ask about the role resources from other scales play in structuring symbolic oppositions within fields. A more fine-tuned vocabulary for field variation can help us better describe particular fields and it is a precondition for generating hypotheses about the conditions under which we can expect to observe fields with specified characteristics. © London School of Economics and Political Science 2017.

  3. Electric Field Imaging

    Data.gov (United States)

    National Aeronautics and Space Administration — NDE historically has focused technology development in propagating wave phenomena with little attention to the field of electrostatics and emanating electric fields....

  4. Gravitation and vacuum field

    International Nuclear Information System (INIS)

    Tevikyan, R.V.

    1986-01-01

    This paper presents equations that describe particles with spins s = 0, 1/2, 1 completely and which also describe 2s + 2 limiting fields as E → ∞. It is shown that the ordinary Hilbert-Einstein action for the gravitation field must be augmented by the action for the Bose vacuum field. This means that one must introduce in the gravitational equations a cosmological term proportional to the square of the strength of the Bose vacuum field. It is shown that the theory of gravitation describes three realities: matter, field, and vacuum field. A new form of matter--the vacuum field--is introduced into field theory

  5. Magnetic Field Calculator

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Magnetic Field Calculator will calculate the total magnetic field, including components (declination, inclination, horizontal intensity, northerly intensity,...

  6. External split field generator

    Science.gov (United States)

    Thundat, Thomas George [Knoxville, TN; Van Neste, Charles W [Kingston, TN; Vass, Arpad Alexander [Oak Ridge, TN

    2012-02-21

    A generator includes a coil disposed about a core. A first stationary magnetic field source may be disposed on a first end portion of the core and a second stationary magnetic field source may be disposed on a second end portion of core. The first and second stationary magnetic field sources apply a stationary magnetic field to the coil. An external magnetic field source may be disposed outside the coil to apply a moving magnetic field to the coil. Electrical energy is generated in response to an interaction between the coil, the moving magnetic field, and the stationary magnetic field.

  7. Magnetic field reconnexion in a sheared field

    International Nuclear Information System (INIS)

    Ugai, M.

    1981-01-01

    A nonlinear development of the Petschek mode in a sheared magnetic field where there is a field component Bsub(z) along an X line is numerically studied. It is found that finite-amplitude intermediate waves, adjacent to the slow shock, may eventually stand in the quasi-steady configuration; on the other hand, the fundamental characteristics of the Petschek-mode development are scarcely influenced, either qualitatively or quantitatively, by the Bsub(z) field. (author)

  8. Wake fields and wake field acceleration

    International Nuclear Information System (INIS)

    Bane, K.L.F.; Wilson, P.B.; Weiland, T.

    1984-12-01

    In this lecture we introduce the concepts of wake fields and wake potentials, examine some basic properties of these functions, show how they can be calculated, and look briefly at a few important applications. One such application is wake field acceleration. The wake field accelerator is capable of producing the high gradients required for future very high energy e + e - linear colliders. The principles of wake field acceleration, and a brief description of experiments in progress in this area, are presented in the concluding section. 40 references, 27 figures

  9. Phase Field Approach

    Science.gov (United States)

    Koyama, Toshiyuki

    The term phase field has recently become known across many fields of materials science. The meaning of phase field is the spatial and temporal order parameter field defined in a continuum-diffused interface model. By using the phase field order parameters, many types of complex microstructure changes observed in materials science are described effectively. This methodology has been referred to as the phase field method, phase field simulation, phase field modeling, phase field approach, etc. In this chapter, the basic concept and theoretical background for the phase field approach is explained in Sects. 21.1 and 21.2. The overview of recent applications of the phase field method is demonstrated in Sects. 21.3 to 21.6.

  10. Variations in land use and nonpoint-source contamination on the Fort Berthold Indian Reservation, west-central North Dakota, 1990-93

    Science.gov (United States)

    Macek-Rowland, Kathleen; Lent, Robert M.

    1996-01-01

    The effects of land-use activities on the water quality of five streams on the Fort Berthold Indian Reservation were evaluated. The five basinsevaluated were East Fork Shell Creek, Deepwater Creek, Bear Den Creek, Moccasin Creek, and Squaw Creek. East Fork Shell Creek and DeepwaterCreek Basins are located east of Lake Sakakawea and Bear Den Creek, Moccasin Creek, and Squaw Creek Basins are located west of the lake. Land-use data for the five selected basins on and adjacent to the Fort Berthold Indian Reservation were obtained for 1990-92. Discharge measurements were made and water-quality samples were collected at stations and sites on each of the five streams during October 1991 through September 1993. Analysis of land-use data indicated that prairie was the largest land-use category in the study area. More prairie acreage was found in the basins located west of Lake Sakakawea than in the basins located east of the lake. Wheat was the predominant crop in the study area. More wheat acreage was found in the basins located east of Lake Sakakawea than in the basins located west of the lake. Discharge data for the five selected streams indicated that all of thestreams were ephemeral and had many days of no flow during the study period. High flows were usually the result of spring runoff or intense storms over the basins. East Fork Shell Creek and Deepwater Creek with larger basins and flatter stream slopes had high flows characterized by rapidly rising flows and gradually receding flows. In contrast, Bear DenCreek, Moccasin Creek, and Squaw Creek with smaller basins and steeper stream slopes had high flows characterized by rapidly rising flows and receding flows of shorter duration. Analysis of water-quality samples indicated concentrations of nitrogen, phosphorus, and total organic carbon varied throughout the study area. Nitrogen concentrations were larger in the streams located east of LakeSakakawea than in the streams located west of the lake. The largest nitrogen

  11. Ninon de Lenclos, esprit fort dans la compagnie des hommes ou de la difficulté de concevoir la maître de philosophie

    Directory of Open Access Journals (Sweden)

    Sophie Houdard

    2010-04-01

    Full Text Available Partant d’un tableau de Nicolas-André Monsiau (1810 représentant Ninon de Lenclos écoutant Molière lisant le Tartuffe au centre d’un parterre exclusivement masculin, nous avons voulu suivre la construction historiographique d’une femme à l’esprit fort. Ninon de Lenclos, célèbre courtisane du xviie siècle est l’un des rares exemples disponibles. Identifiée comme esprit fort dès le début xxe siècle, elle hérite de la construction historiographique du xviiie siècle qui en a fait une courtisane raisonnable qui a su s’entourer de grands esprits pour diffuser la sagesse de la Renaissance incrédule. À aucun moment, Ninon de Lenclos n’est représentée comme disposant d’un savoir autonome, a fortiori elle n’est jamais pensée comme capable de transmettre un savoir. Pourtant la figure d’Aspasie, « la » maître d’éloquence et de philosophie de Périclès hante l’historiographie de Ninon de Lenclos, comme une fiction à la fois disponible et repoussée. Ninon de Lenclos a su pourtant tisser une sociabilité mixte où l’amitié, les plaisirs du corps et de l’esprit déniaisé étaient cultivés, mais c’est la difficulté à le penser qui a fait de Ninon un homme autre.After Nicolas-André Monsiau’s painting (1810 showing Ninon de Lenclos, amongst a group of male spectators, who listens to Molière as he reads his Tartuffe, we want to follow the historiographical construction of a woman as a « freethinker ». Ninon de Lenclos, the famous xviith Century’s female courtesan, is one of the rare available exemples of this kind of character. Well-known as a freethinker form the begining of the xxth Century, she also inherits the historiographical construction the xviiith produced about her. During the xviiith Century, indeed, Ninon was conceived as a reasonable woman, surrounded by illustrious men helping her to spread, during the Enlightment, the Renaissance’s unbelievers’ wisdom. But as she had

  12. Field Campaign Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Voyles, J. W. [DOE ARM Climate Research Facility, Washington, DC (United States); Chapman, L. A. [DOE ARM Climate Research Facility, Washington, DC (United States)

    2015-12-01

    This document establishes a common set of guidelines for the Atmospheric Radiation Measurement (ARM) Climate Research Facility for planning, executing, and closing out field campaigns. The steps that guide individual field campaigns are described in the Field Campaign Tracking System and are specifically tailored to meet the scope of each field campaign.

  13. Embedding classical fields in quantum field theories

    International Nuclear Information System (INIS)

    Blaha, S.

    1978-01-01

    We describe a procedure for quantizing a classical field theory which is the field-theoretica analog of Sudarshan's method for embedding a classical-mechanical system in a quantum-mechanical system. The essence of the difference between our quantization procedure and Fock-space quantization lies in the choice of vacuum states. The key to our choice of vacuum is the procedure we outline for constructing Lagrangians which have gradient terms linear in the field varialbes from classical Lagrangians which have gradient terms which are quadratic in field variables. We apply this procedure to model electrodynamic field theories, Yang-Mills theories, and a vierbein model of gravity. In the case of electrodynamics models we find a formalism with a close similarity to the coherent-soft-photon-state formalism of QED. In addition, photons propagate to t = + infinity via retarded propagators. We also show how to construct a quantum field for action-at-a-distance electrodynamics. In the Yang-Mills case we show that a previously suggested model for quark confinement necessarily has gluons with principle-value propagation which allows the model to be unitary despite the presence of higher-order-derivative field equations. In the vierbein-gravity model we show that our quantization procedure allows us to treat the classical and quantum parts of the metric field in a unified manner. We find a new perturbation scheme for quantum gravity as a result

  14. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    International Nuclear Information System (INIS)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC's Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON

  15. Geohydrology of the unsaturated zone and simulated time of arrival of landfill leachate at the water table, municipal solid waste landfill facility, US Army Air Defense Artillery Center and Fort Bliss, El Paso County, Texas

    Science.gov (United States)

    Frenzel, Peter F.; Abeyta, Cynthia G.

    1999-01-01

    The U.S. Air Defense Artillery Center and Fort Bliss Municipal Solid Waste Landfill Facility (MSWLF) is located about 10 miles northeast of downtown El Paso, Texas. The landfill is built on the Hueco Bolson, a deposit that yields water to five public-supply wells within 1.1 miles of the landfill boundary on all sides. The bolson deposits consist of lenses and mixtures of sand, clay, silt, gravel, and caliche. The unsaturated zone at the landfill is about 300 feet thick. The Hydrologic Evaluation of Landfill Performance (HELP) and the Multimedia Exposure Assessment Model for Evaluating the Land Disposal of Wastes (MULTIMED) computer models were used to simulate the time of first arrival of landfill leachate at the water table. Site-specific data were collected for model input. At five sites on the landfill cover, hydraulic conductivity was measured by an in situ method; in addition, laboratory values were obtained for porosity, moisture content at field capacity, and moisture content at wilting point. Twenty-seven sediment samples were collected from two adjacent boreholes drilled near the southwest corner of the landfill. Of these, 23 samples were assumed to represent the unsaturated zone beneath the landfill. The core samples were analyzed in the laboratory for various characteristics required for the HELP and MULTIMED models: initial moisture content, dry bulk density, porosity, saturated hydraulic conductivity, moisture retention percentages at various suction values, total organic carbon, and pH. Parameters were calculated for the van Genuchten and Brooks-Corey equations that relate hydraulic conductivity to saturation. A reported recharge value of 0.008 inch per year was estimated on the basis of soil- water chloride concentration. The HELP model was implemented using input values that were based mostly on site-specific data or assumed in a conservative manner. Exceptions were the default values used for waste characteristics. Flow through the landfill was

  16. Geodesic fields with singularities

    International Nuclear Information System (INIS)

    Kafker, A.H.

    1979-01-01

    The question considered is whether or not a Riemannian metric can be found to make a given curve field on a closed surface into geodesics. Allowing singularities removes the restriction to Euler characteristic zero. The main results are the following: only two types of isolated singularities can occur in a geodesic field on a surface. No geodsic fields exist on a surface with Euler characteristic less than zero. If the Euler characteristic is zero, such a geodesic field can have only removable singularities. Only a limited number of geodesic fields exist on S 2 and RP 2 . A closed geodesic (perhaps made from several curves and singularities) always appears in such a field

  17. Engineering field theory

    CERN Document Server

    Baden Fuller, A J

    2014-01-01

    Engineering Field Theory focuses on the applications of field theory in gravitation, electrostatics, magnetism, electric current flow, conductive heat transfer, fluid flow, and seepage.The manuscript first ponders on electric flux, electrical materials, and flux function. Discussions focus on field intensity at the surface of a conductor, force on a charged surface, atomic properties, doublet and uniform field, flux tube and flux line, line charge and line sink, field of a surface charge, field intensity, flux density, permittivity, and Coulomb's law. The text then takes a look at gravitation

  18. A formação dos engenheiros militares: Azevedo Fortes, matemática e ensino da engenharia militar no século XVIII em Portugal e no Brasil

    OpenAIRE

    Dulcyene Maria Ribeiro

    2009-01-01

    Este trabalho tem por fim construir uma história, fundamentalmente com base em fontes primárias, da formação dos engenheiros militares na primeira metade do século XVIII em Portugal e no Brasil, no que se refere principalmente aos conteúdos estudados, com destaque para a álgebra. O tema escolhido deriva do trabalho de iniciação científica que posteriormente teve continuidade na dissertação de mestrado intitulada: A Obra Lógica Racional, Geométrica e Analítica (1744) de Manoel de Azevedo Forte...

  19. L'INTRODUCTION DU CONTROLE DE GESTION EN P.M.E ETUDE D'UN CAS DE STRUCTURATION TARDIVE DE LA GESTION D'UNE ENTREPRISE FAMILIALE EN FORTE CROISSANCE

    OpenAIRE

    Meyssonnier, François; Zawadzki, Cindy

    2007-01-01

    International audience; La structuration tardive de la gestion d'une entreprise familiale moyenne en forte croissance est décrite et analysée à partir d'une démarche longitudinale de recherche-action. En plus de la taille, le rôle de facteurs de contingence tels que le positionnement stratégique, la fonction de production et le profil du dirigeant dans l'introduction du contrôle de gestion est mis en évidence. Les tentatives de mise en oeuvre successives, et pour le moment infructueuses, du c...

  20. Technical evaluation of the electrical, instrumentation, and control design aspects of the override of containment purge valve isolation and other engineered safety feature signals for the Fort Calhoun Nuclear Power Plant

    International Nuclear Information System (INIS)

    Hackett, D.B.

    1980-01-01

    This report documents the technical evaluation of the electrical, instrumentation, and control design aspects of the override of containment purge valve isolation and other engineered safety feature signals for the Fort Calhoun nuclear power plant. The review criteria are based on IEEE Std-279-1971 requirements for the safety signals to all purge and ventilation isolation valves. This report is supplied as part of the Selected Electrical, Instrumentation, and Control Systems Issues Program being conducted for the US Nuclear Regulatory Commission by Lawrence Livermore Laboratory