  1. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2003-12-01

    We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  2. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  3. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  4. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

    2005-01-01

    In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence

  5. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at

  6. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2006 - March 2007. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2008-01-01

    Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.

  7. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zabel, Richard; Williams, John G.; Smith, Steven G. (Northwest and Alaska Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2002-06-01

    In 2001, the National Marine Fisheries Service and the University of Washington completed the ninth year of a study to estimate survival and travel time of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from passive integrated transponder (PIT)-tagged fish. We PIT tagged and released at Lower Granite Dam a total of 17,028 hatchery and 3,550 wild steelhead. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream of the hydropower system and sites within the hydropower system. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using the Single-Release Model. Primary research objectives in 2001 were to: (1) estimate reach and project survival and travel time in the Snake and Columbia Rivers throughout the yearling chinook salmon and steelhead migrations; (2) evaluate relationships between survival estimates and migration conditions; and (3) evaluate the survival-estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2001 for PIT-tagged yearling chinook salmon and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Results are reported primarily in the form of tables and figures with a minimum of text. More details on methodology and statistical models used are provided in previous reports cited in the text. Results for summer-migrating chinook salmon will be reported separately.

  8. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  9. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  10. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  11. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  12. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  13. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  14. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L. (Oregon Department of Fish and Wildlife)

    2004-02-01

    We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  15. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele; Berggren, Thomas J.; Filardo, Margaret (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2003-09-01

    The runoff volumes in 2002 were near average for the January to July period above Lower Granite Dam (80%) and The Dalles Dam (97%). The year 2002 hydrosystem operations and runoff conditions resulted in flows that were less than the seasonal Biological Opinion (Opinion) flow objectives at Lower Granite Dam for both the spring and summer period. The seasonal flow objectives for Priest Rapids and McNary dams were exceeded for the spring period, but at McNary Dam summer flow objectives were not met. While seasonal flow objectives were exceeded for the spring at McNary Dam, the 2002 season illustrated that Biological Opinion management to seasonal flow targets can result in conditions where a major portion of the juvenile fish migration migrates in conditions that are less than the flow objectives. The delay in runoff due to cool weather conditions and the inability of reservoirs to augment flows by drafting lower than the flood control elevations, resulted in flows less than the Opinion objectives until May 22, 2002. By this time approximately 73% of the yearling chinook and 56% of steelhead had already passed the project. For the most part, spill in 2002 was managed below the gas waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. The exception was at Lower Monumental Dam where no Biological Opinion spill occurred due to the need to conduct repairs in the stilling basin. Survival estimates obtained for PIT tagged juveniles were similar in range to those observed prior to 2001. A multi-year analysis of juvenile survival and the factors that affect it was conducted in 2002. A water transit time and flow relation was demonstrated for spring migrating chinook and steelhead of Snake River and Mid Columbia River origin. Returning numbers of adults observed at Bonneville Dam declined for spring chinook, steelhead and coho, while summer and fall chinook numbers increased. However, all numbers were far greater

  16. 1998-1999 evaluation of fall chinook and chum salmon spawning below Bonneville, The Dalles, John Day and McNary dams

    International Nuclear Information System (INIS)

    Naald, W.D. van der

    2001-01-01

    This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6

  17. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rakowski, Cynthia L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Perkins, William A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Richmond, Marshall C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  18. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kern, J. Chris; Ward, David L.; Farr, Ruth A. (Oregon Department of Fish and Wildlife)

    2002-02-01

    We report on our progress from April 2000 through March 2001 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), the U.S. Fish and Wildlife Service (USFWS; Report E), and Oregon State University (OSU; Report F). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 2000 through March 2001 are listed.

  19. Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1; FINAL

    International Nuclear Information System (INIS)

    Carlson, Thomas J

    2001-01-01

    This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories

  20. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  1. Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Tiffan, Kenneth F.; Haskell, Craig A.; Kock, Tobias J.

    2008-12-01

    In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific

  2. Forrest Ranch Acquisition, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brent

    2003-08-01

    Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The

  3. Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2003-06-01

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to

  4. Hood River Production Program Review, Final Report 1991-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Underwood, Keith; Chapman, Colin; Ackerman, Nicklaus

    2003-12-01

    This document provides a comprehensive review of Bonneville Power Administration (BPA) funded activities within the Hood River Basin from 1991 to 2001. These activities, known as the Hood River Production Program (HRPP), are intended to mitigate for fish losses related to operation of federal dams in the Columbia River Basin, and to contribute to recovery of endangered and/or threatened salmon and steelhead, as directed by Nation Oceanic and Atmospheric Administration - Fisheries (NOAA Fisheries). The Environmental Impact Statement (EIS) for the HRPP, which authorized BPA to fund salmon and steelhead enhancement activities in the Hood River Basin, was completed in 1996 (BPA 1996). The EIS specified seven years of monitoring and evaluation (1996-2002) after program implementation to determine if program actions needed modification to meet program objectives. The EIS also called for a program review after 2002, that review is reported here.

  5. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  6. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batten, G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  7. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  8. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  9. END-OF-YEAR-CLOSURE 2001/2002

    CERN Document Server

    Human Resources Division

    2001-01-01

    As announced in Weekly Bulletin Nº 4/2001, the Laboratory will be closed from Saturday, 22 December 2001 to Sunday, 6 January 2002 inclusive. This period consists of 16 days : 4 days' official holiday, i.e. 24, 25 and 31 December 2001 and 1 January 2002; 6 days' special paid leave in accordance with Article R II 4.34 of the Staff Regulations, i.e. 26, 27 and 28 December 2001 and 2, 3 and 4 January 2002; 3 Saturdays, i.e. 22 and 29 December 2001 and 5 January 2002; 3 Sundays, i.e. 23 and 30 December 2001 and 6 January 2002. The first working day in the New Year will be Monday, 7 January 2002. Further information will be available from Division Secretariats, specifically concerning the conditions applicable to members of the personnel who are required to work during this period.

  10. Hydraulic alterations resulting from hydropower development in the Bonneville Reach of the Columbia River

    Science.gov (United States)

    Hatten, James R.; Batt, Thomas R.

    2010-01-01

    We used a two-dimensional (2D) hydrodynamic model to simulate and compare the hydraulic characteristics in a 74-km reach of the Columbia River (the Bonneville Reach) before and after construction of Bonneville Dam. For hydrodynamic modeling, we created a bathymetric layer of the Bonneville Reach from single-beam and multi-beam echo-sounder surveys, digital elevation models, and navigation surveys. We calibrated the hydrodynamic model at 100 and 300 kcfs with a user-defined roughness layer, a variable-sized mesh, and a U.S. Army Corps of Engineers backwater curve. We verified the 2D model with acoustic Doppler current profiler (ADCP) data at 14 transects and three flows. The 2D model was 88% accurate for water depths, and 77% accurate for velocities. We verified a pre-dam 2D model run at 126 kcfs using pre-dam aerial photos from September 1935. Hydraulic simulations indicated that mean water depths in the Bonneville Reach increased by 34% following dam construction, while mean velocities decreased by 58%. There are numerous activities that would benefit from data output from the 2D model, including biological sampling, bioenergetics, and spatially explicit habitat modeling.

  11. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  12. Fish Passage Center 2001 annual report.; ANNUAL

    International Nuclear Information System (INIS)

    Fish Passage Center

    2002-01-01

    Extremely poor water conditions within the Columbia River Basin along with extraordinary power market conditions created an exceptionally poor migration year for juvenile salmon and steelhead. Monthly 2001 precipitation at the Columbia above Grand Coulee, the Snake River above Ice Harbor, and the Columbia River above The Dalles was approximately 70% of average. As a result the 2001 January-July runoff volume at The Dalles was the second lowest in Columbia River recorded history. As a compounding factor to the near record low flows in 2001, California energy deregulation and the resulting volatile power market created a financial crisis for the Bonneville Power Administration (BPA). Power emergencies were first declared in the summer and winter of 2000 for brief periods of time. In February of 2001, and on April 3, the BPA declared a ''power emergency'' and suspended many of the Endangered Species Act (ESA) and Biological Opinion (Opinion) measures that addressed mainstem Columbia and Snake Rivers juvenile fish passage. The river and reservoir system was operated primarily for power generation. Power generation requirements in January through March coincidentally provided emergence and rearing flows for the Ives-Pierce Islands spawning area below Bonneville Dam. In particular, flow and spill measures to protect juvenile downstream migrant salmon and steelhead were nearly totally suspended. Spring and summer flows were below the Opinion migration target at all sites. Maximum smolt transportation was implemented instead of the Opinion in-river juvenile passage measures. On May 16, the BPA Administrator decided to implement a limited spill for fish passage at Bonneville and The Dalles dams. On May 25, a limited spill program was added at McNary and John Day dams. Spill extended to July 15. Juvenile migrants, which passed McNary Dam after May 21, experienced a noticeable, improved survival, as a benefit of spill at John Day Dam. The suspension of Biological Opinion

  13. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka during the 2002 spring out-migration at migrant traps on the Snake River and Salmon River. In 2002 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 11.4 times greater in 2002 than in 2001. The wild Chinook catch was 15.5 times greater than the previous year. Hatchery steelhead trout catch was 2.9 times greater than in 2001. Wild steelhead trout catch was 2.8 times greater than the previous year. The Snake River trap collected 3,996 age-0 Chinook salmon of unknown rearing. During 2002, the Snake River trap captured 69 hatchery and 235 wild/natural sockeye salmon and 114 hatchery coho salmon O. kisutch. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. The significant increase in catch in 2002 was due to a 3.1 fold increase in hatchery Chinook production and a more normal spring runoff. Trap operations began on March 10 and were terminated on June 7. The trap was out of operation for a total of four days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 4.2 times greater and wild Chinook salmon catch was 2.4 times greater than in 2001. The hatchery steelhead trout collection in 2002 was 81% of the 2001 numbers. Wild steelhead trout collection in 2002 was 81% of the previous year's catch. Trap operations began on March 10 and were terminated on May 29 due to high flows. The trap was out of operation for four days due to high flow or debris. The

  14. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  15. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam

    International Nuclear Information System (INIS)

    Nigro, A.A.

    1991-09-01

    We report on our progress from April 1990 through March 1991 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from NcNary Dam; to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam; to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams; and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights of results of this work in the Dalles, Bonneville and John Day reservoirs are included in the four pages included in this report

  16. Relative survival of juvenile chinook salmon (Oncorhynchus tshawyischa) through a Bonneville dam on the Columbia River

    International Nuclear Information System (INIS)

    Ferguson, J.

    1993-01-01

    The Bonneville Dam second powerhouse bypass system for juvenile salmon has one 6.1-m submersible travelling screen in each intake of all eight turbines, for a total of 24 screens. These screens set up a hydraulic cushion that deflects juvenile salmon away from the turbine intakes and into vertical bulkhead slots, from which they exit by their own volition into a collection gallery that travels the length of the powerhouse to a dewatering station and the outlet. A multiple-year evaluation was conducted on the comparative survival of subyearling chinook salmon through various passage modes at the dam. Using this information, operational scenarios could then be formulated to provide additional juvenile protection while meeting power system demands. In the summer, the juvenile salmon that passed through the bypass system had significantly lower survival rates than upper and lower turbine, spillway, and downstream control groups. Predation by northern squawfish (Ptychocheilus oregonensis) was suspected to have been the cause of high mortalities among bypassed fish. No significant differences existed between survival rates of upper and lower turbine groups. 7 refs., 2 figs., 1 tab

  17. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1990-09-01

    We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

  18. Environmental taxes 1991 - 2001 (2002)

    International Nuclear Information System (INIS)

    Anon.

    2002-01-01

    The statistics presents statements of environmental taxes for the period 1991-2001 (and budget figure for 2002). Environmental taxes are a concept for pollution, energy, transportation and resource related taxes. Income of the government from environmental taxes have increased from 30,0 billions DDK in 1991 to 62,2 billions DDK in 2001 - a little more than a doubling. The environmental taxes' part of the total taxes' part og the total taxes has increased from 7,5% in 1991 to 9,4% in 2001. In 2001 the energy taxes are 57%, the transportation taxes 36% and the pollution and resource taxes 7% of the environmental taxes. (LN)

  19. The VAEC - Annual report for 2001 - 2002

    Energy Technology Data Exchange (ETDEWEB)

    Tan, Vuong Huu; Hong, Le Van; Anh, Nguyen Hoang; Hieu, Trinh Dang; Trang, Nguyen Trong; Hong, Dang Thi [eds.

    2003-12-01

    The VAEC Annual Report for 2001-2002 has been prepared as an account of works carried out at the Vietnam Atomic Energy Commission (VAEC) for the period 2001-2002. The Report contains main results from the VAEC's activities of research and development in following fields: nuclear physics; reactor physics and nuclear energy; nuclear methods; nuclear medicine and radioisotope production; radiation protection and radioactive waste management; ecology and environment; biotechnology and agriculture; radiation technology; nuclear fuels, material and radiochemistry; computation and other topics. (NHA)

  20. Brazilian energy balance 2002: calendar year 2001

    International Nuclear Information System (INIS)

    2002-12-01

    The Brazilian Energy Balance 2002, based on 2001 data, contains the information related to the supply and consumption of the primary and secondary energy sources, provided by data and information of responsible sectors. This version presents important differences in relation to the previous editions, new technical concepts were introduced for the treatment of calorific powers of energy sources in the composition and consolidation of data, and also in the structure of its contents. The Balance 2002 was structured in the same way of the last edition, divided in 8 chapters, as follows: summary of the relevant indicators of 2001 and consolidated data of production, consumption and external dependence on energy, and also the sectorial composition of the consumption of the different groups of energy sources - period 1970/2001; energy supply and demand by source - 1986/2001; energy consumption by sector - 1986/2001; energy foreign trading - 1986/2001; transformation centers balances - 1986/2001; energy resources and reserves - 1973/2001; energy and socio-economy - 1986/2001; regional parameters and appendices including: installed capacity, international data, general structure of the balance, information processing, conversion units and consolidated energy balances - 1970/2001,in the 'kcal' unit, calculated in PCI- Inferior Calorific Power. This new model has the intention to approximate the Brazilian Energy Balance to the international methodologies, mainly to the OECD balances

  1. Spruce Lake Dam reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, G. [SGE Acres Ltd., Fredericton, NB (Canada); Barnard, J. [SGE Acres Ltd., St. John' s, NF (Canada); Vriezen, C. [City of Saint John, NF (Canada); Stephenson, M. [Jacques Whitford Environment Ltd., Fredericton, NB (Canada)

    2004-09-01

    Spruce Lake Dam was constructed in 1898 as part of the water supply system for Saint John, New Brunswick. The original dam was a 6 meter high, 140 meter long concrete gravity dam with an intake structure at its mid point and an overflow spillway at the left abutment. A rehabilitation project was launched in 2001 to bring the deteriorated dam into conformance with the dam safety guidelines of the Canadian Dam Association. The project criteria included minimal disruption to normal operation of water supply facilities and no negative effect on water quality. The project involved installation of a new low level outlet, removal of a gate house and water intake pipes, replacement of an access road culvert in the spillway channel, and raising the earth dam section by 1.8 meters to allow for increased water storage. The new raised section has an impervious core. The project also involved site and geotechnical investigations as well as hydrotechnical and environmental studies. This presentation described the final design of the remedial work and the environmental permitting procedures. Raising the operating level of the system proved successful as demonstrated by the fewer number of pumping days required after dam rehabilitation. The dam safety assessment under the Canadian Environmental Assessment Act began in April 2001, and the rehabilitation was completed by the end of 2002. 1 tab., 8 figs.

  2. Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

    2001-05-01

    This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

  3. The New 2001-2002 Term. Supreme Court Roundup.

    Science.gov (United States)

    Williams, Charles F.

    2001-01-01

    Discusses the issues addressed during the 2001-2002 term of the U.S. Supreme Court, which convened on October 1, 2001: (1) school vouchers; (2) affirmative action; (3) online pornography; and (4) the death penalty. (CMK)

  4. Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

    2008-03-12

    The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

  5. OFFICIAL HOLIDAYS IN 2001 AND END-OF-YEAR CLOSURE 2001/2002

    CERN Document Server

    Human Resources Division

    2001-01-01

    (Application of Articles R II 4.33 and R II ;4.34 of the Staff Regulations) Official holidays in 2001 (in addition to the end-of-year holidays) : Friday, 13th April (Good Friday) Monday, 16th April (Easter Monday) Tuesday, 1st May Thursday, 24th May (Ascension Day) Monday, 4th June (Whit Monday) Thursday, 6th September (Jeûne genevois) Annual closure of the site of the Organization and day of special leave granted by the Director-General : The Laboratory will be closed from Saturday, 22nd December 2001 to Sunday, 6th January 2002 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 7th January 2002.

  6. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); Butler, Chris (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA)

    2003-09-01

    . The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002. This work was done in accordance with the scope of work

  7. Millisteks kujunevad majandusaastad 2001 ja 2002? : maailmamajandus on edukas, kuid natuke jahtunum / Lembo Tanning

    Index Scriptorium Estoniae

    Tanning, Lembo

    2001-01-01

    Maailmamajanduse prognoosid OECD-lt, IMF-lt ja Eurostatilt aastateks 2001 ja 2002. Tabelid ja diagrammid: töötuse määr aastatel 2000-2002; maailma kogutoodangu kasv, 1982-2001; maailma valitud riikide ja regioonide kogutoodangu kasv, 2001; inflatsioon, 2000-2002

  8. JAERI tandem annual report 2001. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, Suehiro; Ikezoe, Hiroshi; Chiba, Satoshi; Nagame, Yuichiro; Sataka, Masao; Iwamoto, Akira (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-11-01

    This annual report describes research activities which have been performed with the JAERI tandem accelerator and the Van de Graaff accelerator from April 1, 2001 to March 31, 2002. Summary reports of 48 papers, and lists of publication, personnel and cooperative research with universities are contained. (author)

  9. Het influenzaseizoen 2001/'02 en de vaccinsamenstelling voor het seizoen 2002/'03.

    NARCIS (Netherlands)

    Rimmelzwaan, G.F.; Jong, J.C. de; Bartelds, A.I.M.; Fouchier, R.A.M.; Wilbrink, B.; Osterhaus, A.D.M.E.

    2002-01-01

    The epidemic in the influenza season 2001/2002 was of moderate activity just like in 2000/2001. The influenza epidemic started in week 2 of 2002 when the clinical influenza activity reported by the general practitioner network of the Netherlands Institute of Primary Health Care (NIVEL) increased.

  10. Israel Seminar 2001-2002

    CERN Document Server

    Schechtman, Gideon

    2003-01-01

    The proceedings of the Israeli GAFA seminar on Geometric Aspect of Functional Analysis during the years 2001-2002 follow the long tradition of the previous volumes. They continue to reflect the general trends of the Theory. Several papers deal with the slicing problem and its relatives. Some deal with the concentration phenomenon and related topics. In many of the papers there is a deep interplay between Probability and Convexity. The volume contains also a profound study on approximating convex sets by randomly chosen polytopes and its relation to floating bodies, an important subject in Classical Convexity Theory. All the papers of this collection are original research papers.

  11. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam Report C, Annual Progress Report April 2003 - March 2004

    Science.gov (United States)

    Parsley, Michael J.; Gadomski, Dena M.; Kofoot, Pete

    2005-01-01

    River discharge and water temperatures that occurred during April through July 2003 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Although optimal spawning temperatures in the four tailraces occurred for less than two weeks, they coincided with a period of relatively high river discharge. Bottom-trawl sampling in Bonneville and The Dalles Reservoirs revealed the presence of young-of-the-year (YOY) white sturgeon in Bonneville Reservoir, but none were captured in The Dalles Reservoir. A comparison of five years of indices of abundance of YOY sturgeon from sampling done by ODFW with gillnets and the USGS with bottom trawls was completed. Despite obvious differences in gear sampling characteristics (e.g. one gear is actively fished, one passively fished), it appears that either gear can be used to assess relative trends in YOY white sturgeon abundance. The analyses suffered due to poor catches of YOY fish, as YOY were only captured in The Dalles Reservoir during three of the five years of comparison sampling, and during only one of four years in John Day Reservoir. However, both gears detected the presence or absence of YOY white sturgeon within a reservoir equally. That is, if any YOY white sturgeon were captured in any year in a reservoir, both gears captured at least one fish, and if one gear failed to collect any YOY white sturgeon, both gears failed. Concerns have been raised that the Wang et al. (1985) egg development relationships for Sacramento River white sturgeon may not be applicable to Columbia Basin stocks. However, using laboratory experiments with white sturgeon eggs incubated at 10, 12, 15, and 18o C, we found no significant differences in development rates of eggs of Columbia, Kootenai, Snake, and Sacramento river fish.

  12. 2001-2002 carbon dioxide emissions in OECD

    International Nuclear Information System (INIS)

    2004-11-01

    This document provides carbon dioxide emissions data, from energy uses and production, from 2001 to 2002 in the OECD. It concerns the climate corrected CO 2 emissions in France, the non corrected CO 2 emissions (M tons), the emissions intensity / the Gross Domestic Product and the emissions intensity / the population (tons per inhabitant). (A.L.B.)

  13. Annual Energy Balance Sheets 2001-2002

    International Nuclear Information System (INIS)

    2004-01-01

    During the year 2002 the primary supply of energy reached 629 TWh, which is 7.7 TWh less than 2001. The decrease originates mainly from the reduced electricity production from water power. Also the electricity production in nuclear power plants decreased by 4.5 TWh. If we were to look at the supplied energy for final consumption we will find a slightly rise by 1.8 TWh. The year 2002 was warmer than a 'normal' year and that consequently brings lower energy needs. Compared with 2001, 2002 was not warmer and a net electricity import of 5.4 TWh covered the energy needs. The energy use increased by 3.3 TWh between 2002 and 2001. The industry sector shows the largest rise by 2.9 TWh, nearly 2 per cent. Within that sector, energy from biomass fuel had a rise by 6.7 per cent. The household sector decreases its energy use by 2.7 per cent, and oil and electricity show the largest decrease. The proportionately high electricity price probably had a slowing down effect on the electricity use. The balance sheets of energy sources are showing the total supply and consumption of energy sources expressed in original units, i.e. units recorded in the primary statistics - mainly commercial units. The production of derived energy commodities is recorded on the supply - side of the balance sheets of energy sources, which is not the case in the energy balance sheets. The balance sheets of energy sources also include specifications of input--output and energy consumption in energy conversion industries. The energy balance sheets are based on primary data recorded in the balance sheets of energy sources, here expressed in a common energy unit, TJ. The production of derived energy is recorded in a second flow-step comprising energy turnover in energy conversion and is also specified in complementary input - output tables for energy conversion industries. The following items are shown in the energy balance sheets. 1.1 Inland supply of primary energy; 1.3 Import; 1.4 Export; 1.5 Changes in

  14. Monitoring of downstream salmon and steelhead trout at federal hydroelectric facilities, annual report 2001.; ANNUAL

    International Nuclear Information System (INIS)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    2002-01-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River (Figure 1). The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration

  15. Annual report of Kansai Research Establishment 2001. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Tajima, Toshiki; Harami, Taikan; Kawanishi, Shun-ichi (eds.) [Japan Atomic Energy Research Inst., Kansai Research Establishment, Kizu, Kyoto (JP)] [and others

    2003-02-01

    This report is the third issue of the annual report of Kansai Research Establishment, Japan Atomic Energy Research Institute. It covers status reports of R and D and results of experiments conducted at the Advanced Photon Research Center and the Synchrotron Radiation Research Center during the period from April 1, 2001 to March 31, 2002. (author)

  16. Toppling the Taliban: Air-Ground Operations in Afghanistan, October 2001-June 2002

    Science.gov (United States)

    2015-01-01

    al Qaeda training camps 17 Benjamin and Simon, 2002, p. 268. 18 Alan Cullison and Andrew Higgins , “A Once Stormy Terror Was Solidified by Cruise...December 11, 2001c. 23 Philip Smucker, “Dissent Grows in Caves of Tora Bora,” Christian Science Monitor, December 11, 2001a. 24 Chris Tomlinson, “U.S...Herald Tribune, December 11, 2001; Glasser, 2001c. 28 Chris Tomlinson, “Afghan Fighters Advance on Tora Bora,” Associated Press, December 11, 2001b

  17. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  18. Factors Affecting the Recreational Fishery in Moses Lake, Washington, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Burgess, Dave

    2003-02-04

    The Moses Lake Project (project No. 199502800) was first funded by Bonneville Power Administration during the FY 99. Work commenced and proceeded through September 2001 when questions arouse on the Scope of Work. Due to funding issues at the beginning of FY 2001 we were unable to secure monies to continue with our proposed scope of work. Consequently, the Moses Lake Project was reduced to one full-time employee. An extension of fifty thousand dollars was granted in which the project with one remaining member by October 2001 continued to operate. By December 2001 the NWPPC granted an additional 20K in spending to secure an advisor that could assist in providing a proposal that the ISRP would find amenable. By Jan 2002, the Moses Lake staff put Dr. David Bennett, from the University of Idaho on payroll. With the guidance of Dr. Bennett the Moses Lake project staff was successful in turning in a new version of the proposal and ultimately received funding by July of 2002. Consequently, the lack of manpower and time spent revising and resubmitting said proposal hampered progress. Consequently, this report covers work conducted on the original Scope of Work (SOW) to July 2002 and then follows the new and accepted SOW from July 2002 through September 2002. Work on the tasks within the newest proposal began prior to official acceptance so as not to loose the window of opportunity to collect data during the summer field season. As of July 2000 we moved forward and began the appropriate tasks outlined in our scope of work. Therefore, portions of the FY 2001 annual report address tasks outlined in the original (appendix 1, original FY2000 SOW) and newest scope(s) of work (Appendix 2, new FY 2000 SOW).

  19. Progress report 2001-2002; Rapport d'activite 2001-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The document reviews the activities of the linear accelerator laboratory (LAL) for the years 2001 and 2002. Most part of these activities are active collaborations in international programs. Some experimental programs like Aleph (apparatus for Lep physics) and Delphi (detector with lepton, photon, and hadron identification) at the Lep (CERN) or Na48 (search for direct violation of the CP invariance) have entered their last stage. Others like H1 (electron-positron experiment at Hera), Babar (measurement of CP violation in the B{sup 0}B-bar{sup 0} system) at Slac (Stanford), or D0 (search for new particles at the Tevatron) at Fermilab, are fully operating and this document describes the contribution of the LAL for each of them. The preparation of experiments for the future LHC has represented the core of LAL's technical activities. This document reviews these activities and achievements for the Atlas (air toroid LHC apparatus system) and LHCB (large hadron collider beauty) experiments. The LAL is also involved in the definition of the future high energy linear electron-positron collider (FLC). The LAL contributes to some experiments of neutrino physics through Nemo (violation of the lepton charge) and Opera (neutrino oscillations) experiments and to various astro-particles experiments such as Eros (micro-lensing effect), Archeops and Planck (cosmology), Virgo (gravitation waves) and Auger (very high energy particles showers). Another important part of LAL's activities is teaching activity mainly inside the curriculum of Paris-sud university. (A.C.)

  20. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

    2006-02-01

    initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope

  1. LGR adult trap data - Operation of the adult trap at Lower Granite Dam

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This Bonneville Power Administration (BPA) - funded project pays for NOAA staff to operate the adult salmon trap located in the fish ladder at Lower Granite Dam. The...

  2. The General Safety Group Annual Report 2001/2002

    CERN Document Server

    Weingarten, W

    2003-01-01

    This report summarizes the main activities of the General Safety (GS) Group of the Technical Inspection and Safety Division during 2001 and 2002, and the results obtained. The different topics in which the group is active are covered: general safety inspections and ergonomics, electrical, chemical and gas safety, chemical pollution containment and control, industrial hygiene, the safety of civil engineering works and outside contractors, fire prevention and the safety aspects of the LHC experiments.

  3. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Friesen, Thomas A. (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-02-01

    Pacific salmon Oncorhynchus spp. populations have declined over the last century due to a variety of human impacts. Chum salmon O. keta populations in the Columbia River have remained severely depressed for the past several decades, while upriver bright (URB) fall Chinook salmon O. tschawytscha populations have maintained relatively healthy levels. For the past seven years we have collected data on adult spawning and juvenile emergence and outmigration of URB fall Chinook and chum salmon populations in the Ives and Pierce islands complex below Bonneville Dam. In 2004, we estimated 1,733 fall Chinook salmon and 336 chum salmon spawned in our study area. Fall Chinook salmon spawning peaked 19 November with 337 redds and chum salmon spawning peaked 3 December with 148 redds. Biological characteristics continue to suggest chum salmon in our study area are similar to nearby stocks in Hardy and Hamilton creeks, and Chinook salmon we observe are similar to upriver bright stocks. Temperature data indicated that 2004 brood URB fall Chinook salmon emergence began on 6 January and ended 27 May 2005, with peak emergence occurring 12 March. Chum salmon emergence began 4 February and continued through 2 May 2005, with peak emergence occurring on 21 March. Between 13 January and 28 June, we sampled 28,984 juvenile Chinook salmon and 1,909 juvenile chum salmon. We also released 32,642 fin-marked and coded-wire tagged juvenile fall Chinook salmon to assess survival. The peak catch of juvenile fall Chinook salmon occurred on 18 April. Our results suggested that the majority of fall Chinook salmon outmigrate during late May and early June, at 70-80 mm fork length (FL). The peak catch of juvenile chum salmon occurred 25 March. Juvenile chum salmon appeared to outmigrate at 40-55 mm FL. Outmigration of chum salmon peaked in March but extended into April and May.

  4. Annual report of JMTR, No.16. FY2001. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-03-01

    During the FY2001 (April 2001 to March 2002), the JMTR (Japan Materials Testing Reactor) was operated in 5 operation cycles (113 days) for irradiation studies on the IASCC of the LWR materials, development of fusion blanket materials, radioisotope productions, and so on. The total number of capsules and hydraulic rabbits irradiated were 105 and 59, respectively. Technology development programs were conducted in the following fields. As concerning to the IASCC studies, an advanced water control system and saturation temperature capsules' were developed and installed in the JMTR, and the performance tests were carried out. Also a crack growth testing device for irradiated specimens was developed and installed in the hot laboratories. An efficient recycle process of {sup 6}Li was developed for the production of pebble type tritium breeder material, and the properties of beryllides were examined, both for the development of fusion reactor blanket. This report summarizes these activities performed in the department of JMTR during the FY2001. (author)

  5. Water Science and Technology Board Annual Report 2001-2002

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2002-10-01

    This annual report marks the twentieth anniversary of the Water Science and Technology Board (WSTB) (1982-2002). The WSTB oversees studies of water issues. The principal products of studies are written reports. These reports cover a wide range of water resources issues of national concern. The following three recently issued reports illustrate the scope of the WSTB's studies: Envisioning the Agenda for Water Resources Research in the Twenty-first Century. The Missouri River Ecosystem: Exploring the Prospects for Recovery, and Assessing the TMDL Approach to Water Quality Management. The WSTB generally meets three times each year where discussions are held on ongoing projects, strategic planning, and developing new initiatives. The meetings also foster communication within the water resources community. The annual report includes a discussion on current studies, completed studies 2001-2002, and future plans, as well as a listing of published reports (1983-2002).

  6. Progress report 2001-2002; Rapport d'activite 2001-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The document reviews the activities of the linear accelerator laboratory (LAL) for the years 2001 and 2002. Most part of these activities are active collaborations in international programs. Some experimental programs like Aleph (apparatus for Lep physics) and Delphi (detector with lepton, photon, and hadron identification) at the Lep (CERN) or Na48 (search for direct violation of the CP invariance) have entered their last stage. Others like H1 (electron-positron experiment at Hera), Babar (measurement of CP violation in the B{sup 0}B-bar{sup 0} system) at Slac (Stanford), or D0 (search for new particles at the Tevatron) at Fermilab, are fully operating and this document describes the contribution of the LAL for each of them. The preparation of experiments for the future LHC has represented the core of LAL's technical activities. This document reviews these activities and achievements for the Atlas (air toroid LHC apparatus system) and LHCB (large hadron collider beauty) experiments. The LAL is also involved in the definition of the future high energy linear electron-positron collider (FLC). The LAL contributes to some experiments of neutrino physics through Nemo (violation of the lepton charge) and Opera (neutrino oscillations) experiments and to various astro-particles experiments such as Eros (micro-lensing effect), Archeops and Planck (cosmology), Virgo (gravitation waves) and Auger (very high energy particles showers). Another important part of LAL's activities is teaching activity mainly inside the curriculum of Paris-sud university. (A.C.)

  7. 2001-2002 carbon dioxide emissions in OECD; Emissions de CO{sub 2} dues a l'energie dans l'OCDE en 2001-2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-11-01

    This document provides carbon dioxide emissions data, from energy uses and production, from 2001 to 2002 in the OECD. It concerns the climate corrected CO{sub 2} emissions in France, the non corrected CO{sub 2} emissions (M tons), the emissions intensity / the Gross Domestic Product and the emissions intensity / the population (tons per inhabitant). (A.L.B.)

  8. IFIN-HH, Scientific Report 2001 - 2002

    International Nuclear Information System (INIS)

    Oancea, Margareta; Schiaua, Claudiu; Grecu, Dan; Dumitriu, Marinela

    2003-01-01

    The annual report of the Horia Hulubei National Institute for Physics and Nuclear Engineering - IFIN-HH on 2001-2002 presents progress reports in the fields of Theoretical Physics (Nuclear, Atomic and Molecular Physics, Mathematical Physics, Field Theory and Elementary Particles, Computational Physics (Physics of Information) and Solid State Physics), Nuclear Physics (Nuclear Structure, Nuclear Reaction, Atomic Physics, Cosmic Rays and Nuclear Astrophysics, Inertial Fusion, Physics of Neutrons and Nuclear Transmutation, Nuclear Instruments and Methods), Particle Physics, Health and Environmental Physics, Applied Physics, Tracers, Radiopharmaceuticals and Radiometry, Waste Management and Site Restoration and Standardization. Appendices are added listing the publications in journals, books and preprints, participations in international conferences and scientific exchanges (foreign visitors, visits abroad, seminars abroad). Finally, the Institute directorate and research staff are listed

  9. Comparative Survival Study (CSS) of Hatchery PIT-tagged Spring/Summer Chinook; Migration Years 1997-2002 Mark/Recapture Activities and Bootstrap Analysis, 2003-2004 Biennial Report.

    Energy Technology Data Exchange (ETDEWEB)

    Berggren, Thomas J.; Franzoni, Henry; Basham, Larry R. (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2003-11-01

    Granite Dam. When D = 1, there is no difference in survival rate after hydrosystem passage. When D < 1, then transported smolts die at a greater rate after release below Bonneville Dam than smolts that have migrated in-river to below Bonneville Dam Major objectives of the CSS include: (1) development of a long-term index of transport SAR to in-river SAR for Snake River hatchery and wild spring and summer Chinook smolts measured at Lower Granite Dam; (2) develop a long-term index of survival rates from release of smolts at Snake River hatcheries to return of adults to the hatcheries; (3) compute and compare the overall SARs for selected upriver and downriver spring and summer Chinook hatchery and wild stocks; and (4) begin a time series of SARs for use in hypothesis testing and in the regional long-term monitoring and evaluation program. Primary CSS focus in this report is for wild and hatchery spring/summer Chinook that outmigrated in 1997 to 2002 and their respective adult returns through 2004.

  10. Progress report on neutron scattering research. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Katano, Susumu; Koizumi, Satoshi; Matsuda, Masaaki (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-11-01

    This issue summarizes research progress in neutron scattering at Japan Atomic Energy Research Institute (JAERI) by utilizing the research reactor JRR-3M during the period between April 1, 2001 and March 31, 2002. (author)

  11. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispell Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); O' Connor, Dick (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-01-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan

  12. Solar Activity, Ultraviolet Radiation and Consequences in Birds in Mexico City, 2001- 2002

    Science.gov (United States)

    Valdes, M.; Velasco, V.

    2008-12-01

    Anomalous behavior in commercial and pet birds in Mexico City was reported during 2002 by veterinarians at the Universidad Nacional Autonoma de Mexico. This was attributed to variations in the surrounding luminosity. The solar components, direct, diffuse, global, ultraviolet band A and B, as well as some meteorological parameters, temperature, relative humidity, and precipitation, were then analyzed at the Solar Radiation Laboratory. Although the total annual radiance of the previously mentioned radiation components did not show important changes, ultraviolet Band-B solar radiation did vary significantly. During 2001 the total annual irradiance , 61.05 Hjcm² to 58.32 Hjcm², was 1.6 standard deviations lower than one year later, in 2002 and increased above the mean total annual irradiance, to 65.75 Hjcm², 2.04 standard deviations, giving a total of 3.73 standard deviations for 2001-2002. Since these differences did not show up clearly in the other solar radiation components, daily extra-atmosphere irradiance was analyzed and used to calculate the total annual extra-atmosphere irradiance, which showed a descent for 2001. Our conclusions imply that Ultraviolet Band-B solar radiation is representative of solar activity and has an important impact on commercial activity related with birds.

  13. Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

  14. Effects of Pool Drawdown and Wing Dams (Pool 8), and Closure Damns (Pool 13), on Navigation Channel Sedimentation Processes, Upper Mississippi River

    National Research Council Canada - National Science Library

    Abraham, David D; Cowan, Mark A; Hendrickson, Jon S; Katzenmeyer, William M; Landwhr, Kevin J; Pratt, Thad C

    2006-01-01

    ... (upstream of Lock and Dam No. 8) near La Crosse, WI, during the summers of 2001 and 2002. Water levels were allowed to drop below normal minimum values to expose mud flats, promote seed germination, and benefit fish and wildlife...

  15. Bonneville - Hood River Vegetation Management Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  16. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  17. Bonneville Power Administration`s Commercial Sector Conservation Market.

    Energy Technology Data Exchange (ETDEWEB)

    Gordan, Frederick M. [Pacific Energy Associates, Inc. (United States)

    1992-11-10

    Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

  18. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  19. Pleistocene Lake Bonneville and Eberswalde Crater of Mars: Quantitative Methods for Recognizing Poorly Developed Lacustrine Shorelines

    Science.gov (United States)

    Jewell, P. W.

    2014-12-01

    The ability to quantify shoreline features on Earth has been aided by advances in acquisition of high-resolution topography through laser imaging and photogrammetry. Well-defined and well-documented features such as the Bonneville, Provo, and Stansbury shorelines of Late Pleistocene Lake Bonneville are recognizable to the untrained eye and easily mappable on aerial photos. The continuity and correlation of lesser shorelines must rely quantitative algorithms for processing high-resolution data in order to gain widespread scientific acceptance. Using Savitsky-Golay filters and the geomorphic methods and criteria described by Hare et al. [2001], minor, transgressive, erosional shorelines of Lake Bonneville have been identified and correlated across the basin with varying degrees of statistical confidence. Results solve one of the key paradoxes of Lake Bonneville first described by G. K. Gilbert in the late 19th century and point the way for understanding climatically driven oscillations of the Last Glacial Maximum in the Great Basin of the United States. Similar techniques have been applied to the Eberswalde Crater area of Mars using HRiSE DEMs (1 m horizontal resolution) where a paleolake is hypothesized to have existed. Results illustrate the challenges of identifying shorelines where long term aeolian processes have degraded the shorelines and field validation is not possible. The work illustrates the promises and challenges of indentifying remnants of a global ocean elsewhere on the red planet.

  20. Walla Walla River Basin Fish Habitat Enhancement Project, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2003-04-01

    In 2001, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled six properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River. Since 1997, approximately 7 miles of critical salmonid habitat has been secured for restoration and protection under this project. Major accomplishments to date include the following: Secured approximately $250,000 in cost share; Secured 7 easements; Planted 30,000+ native plants; Installed 50,000+ cuttings; and Seeded 18 acres to native grass. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan. Basin-wide monitoring also included the deployment of 6 thermographs to collect summer stream temperatures.

  1. A review of fast reactor program in Japan (April 2001 - March 2002)

    International Nuclear Information System (INIS)

    Nagata, T.; Ieda, Y.

    2002-01-01

    This report describes the research and development activities on fast reactors in Japan thru April 2001 to March 2002. In December 2001, the Cabinet decided the Plan for Reorganization of Government-funded Corporations including the merger of JNC and the Japan Atomic Energy Research Institute (JAERI). A law to set up a new entity is supposed to be submitted to the National Diet by the Japanese Fiscal Year (JFY) 2004. In the Experimental Fast Reactor Joyo, thirty-five duty cycle operations and thirteen special tests with the MK-II core were completed by June 2000 without any fuel pin failures or serious plant trouble. The reactor is currently being upgraded to the MK-III core. Though a fire broke out in the maintenance building of Joyo in October 2001, the Mk-III construction work was restarted in February 2002. In the Prototype Fast Breeder Reactor Monju, countermeasures against sodium leakage have already been drawn up based on Monju comprehensive safety review. The safety licensing examination for the plant modification of Monju is undergoing. As for the Feasibility Study on Commercialized Fast Reactor Cycle Systems, JFY2001 was the first year of its second phase. A three-year period from JFY2001 to 2003 is the initial term of this phase. During this term, research activities are being focused on the design of the candidate concepts and fundamental tests of key technologies. An interim summary of these activities will be checked and reviewed, and based on the results; the research for JFY 2004 to 2005 will be conducted in order to narrow down the number of alternatives for the fast reactor cycle. (author)

  2. United States Transuranium and Uranium Registries. Annual report February 1, 2001 - January 31, 2002

    International Nuclear Information System (INIS)

    Ehrhart, Susan M.; Filipy, Ronald E.

    2002-01-01

    This report documents the activities of the United States Transuranium and Uranium Registries (USTUR) from February 2001 through January 2002. Progress in continuing collaborations and several new collaborations is reviewed

  3. United States Transuranium and Uranium Registries. Annual report February 1, 2001--January 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Ehrhart, Susan M. (ed.); Filipy, Ronald E. (ed)

    2002-07-01

    This report documents the activities of the United States Transuranium and Uranium Registries (USTUR) from February 2001 through January 2002. Progress in continuing collaborations and several new collaborations is reviewed.

  4. de nutrición infantil 2001-2002.

    Directory of Open Access Journals (Sweden)

    Lucía Díez-Gañán

    2007-01-01

    Full Text Available Fundamento: Para conocer la situación alimentaria y nutricional en la población infantil, sobre la que no existía información actualizada, el Instituto de Salud Pública desarrolló la Encuesta de Nutrición Infantil de la Comunidad de Madrid 2001/2002 (ENICM. En este trabajo se analiza la ENICM para describir y evaluar la ingesta de alimentos, energía y nutrientes en esta población. Métodos: Estudio transversal sobre una muestra representativa de la población de 5-12 años de la Comunidad de Madrid. La información alimentaria se recogió en 2001 y 2002 mediante dos recuerdos de 24 horas. Se ha estudiado la ingesta total diaria de alimentos, energía y nutrientes. Los análisis incluyen los 1.852 niños con información completa en los dos recuerdos (90,8% de las entrevistas realizadas. Resultados: La ingesta media total diaria de alimentos es 1.460,7 gramos/persona/día. Salvo para los lácteos, huevos y aceites, la ingesta en los grupos alimentarios básicos es inadecuada, particularmente baja en las frutas frescas, verduras y hortalizas. La ingesta media energética y nutricional resultante es 1.905,9 kcal/persona/día; 43,6% hidratos de carbono; 17,4% proteínas, 39,0% lípidos (13,3% grasas saturadas, 16,8% monoinsaturadas, 5,0% poliinsaturadas; 363,8 mg de colesterol; 13,6 g de fibra e ingestas por debajo de las recomendadas de zinc, ácido fólico, vitaminas D y E (ambos sexos y hierro y vitamina B6 (niñas. Conclusiones: La dieta de la población infantil de la Comunidad de Madrid presenta desequilibrios que es necesario mejorar: ingesta inadecuada de alimentos básicos, exceso de proteínas, grasas saturadas y colesterol y déficit de hidratos de carbono, fibra y algunos micronutrientes.

  5. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1988-1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Dept. of Fish and Wildlife, Portland, OR (USA))

    1989-09-01

    We report on our progress from April 1988 through March 1989 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. Highlights of results of our work in the Dalles and Bonneville reservoirs are: using setlines, we caught 1,586 sturgeon in The Dalles Reservoir and 484 sturgeon in Bonneville Reservoir in 1988. Fork length of fish caught ranged from 34 cm to 274 cm. Of the fish caught we marked 1,248 in The Dalles Reservoir and 341 in Bonneville Reservoir. Of the fish marked in 1988, we recaptured 82 in The Dalles Reservoir and none in Bonneville Reservoir. We recaptured 89 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 35 fish marked in 1988 and 16 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 2 sturgeon marked in 1988 in Bonneville Reservoir. Individual papers were processed separately for the data base.

  6. Colville Tribal Fish Hatchery, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Arteburn, John; Christensen, David (Colville Confederated Tribes, Nespelem, WA)

    2003-03-01

    Federal hydropower projects as well as private power utility systems have had a major negative impact upon anadromous fish resources that once flourished in the Columbia River and it's tributaries. Several areas have been completely blocked to anadromous fish by dams, destroying the primary food resource (salmon) for many native people forcing them to rely heavily upon resident fish to replace these lost resources. The Colville Tribal Fish Hatchery is an artificial production program that addresses the loss of anadromous fish resources in the Upper Columbia Sub-Region within the ''blocked area'' created by the construction of Chief Joseph and Grand Coulee Dams. This project enhances resident fisheries located in the Intermountain and Columbia Cascade Provinces, specifically within the Colville Reservation portion of the Upper Columbia, SanPoil and Oakanogan Sub-Basins. The project partially mitigates for anadromous fish losses through protection/augmentation of resident fish populations to enhance fishery potential (i.e. in-place, out-of-kind mitigation) pursuant to Resident Fish Substitution Policy of the Northwest Power Planning Councils Fish and Wildlife Program. The hatchery was accepted into the Council's Fish and Wildlife Program in 1984 and the hatchery was completed in 1990. The Colville Tribal Hatchery (CTH) is located on the northern bank of the Columbia River just down stream of the town of Bridgeport, Washington that is just down stream of Chief Joseph Dam. The hatchery is located on land owned by the Colville Tribes. The minimum production quota for this facility is 22,679 kg (50,000 lbs.) of trout annually. All fish produced are released into reservation waters, including boundary waters in an effort to provide a successful subsistence/recreational fishery for Colville Tribal members and provide for a successful nonmember sport fishery. The majority of the fish distributed from the facility are intended to support &apos

  7. Overview of the main economic indicators in 1993-2000 and forecast for 2001-2002

    Index Scriptorium Estoniae

    2002-01-01

    Ülevaade indikaatoritest: sisemajanduse koguprodukt, tarbijahinnaindeks, väliskaubandus, tööhõive, tööstustoodang, elanike sissetulekud. Diagrammid ja tabel: tähtsamad majandusindikaatorid ja nende prognoos 2001. ja 2002. a.

  8. Progress report 2001-2002

    International Nuclear Information System (INIS)

    2003-01-01

    The document reviews the activities of the linear accelerator laboratory (LAL) for the years 2001 and 2002. Most part of these activities are active collaborations in international programs. Some experimental programs like Aleph (apparatus for Lep physics) and Delphi (detector with lepton, photon, and hadron identification) at the Lep (CERN) or Na48 (search for direct violation of the CP invariance) have entered their last stage. Others like H1 (electron-positron experiment at Hera), Babar (measurement of CP violation in the B 0 B-bar 0 system) at Slac (Stanford), or D0 (search for new particles at the Tevatron) at Fermilab, are fully operating and this document describes the contribution of the LAL for each of them. The preparation of experiments for the future LHC has represented the core of LAL's technical activities. This document reviews these activities and achievements for the Atlas (air toroid LHC apparatus system) and LHCB (large hadron collider beauty) experiments. The LAL is also involved in the definition of the future high energy linear electron-positron collider (FLC). The LAL contributes to some experiments of neutrino physics through Nemo (violation of the lepton charge) and Opera (neutrino oscillations) experiments and to various astro-particles experiments such as Eros (micro-lensing effect), Archeops and Planck (cosmology), Virgo (gravitation waves) and Auger (very high energy particles showers). Another important part of LAL's activities is teaching activity mainly inside the curriculum of Paris-sud university. (A.C.)

  9. Estonie 2001-2002 : turbulences politiques a la veille des grands rendez-vous internationaux / Antoine Chalvin, Juliette Déplanque

    Index Scriptorium Estoniae

    Chalvin, Antoine

    2002-01-01

    Eesti sisepoliitikast aastal 2001 - 2002. Presidendivalimistele järgnenud valitsuskriisist, majandusnäitajatest, Eesti ja Prantsusmaa vahelistest majandussuhetest ning Eesti peatsest ühinemisest Euroopa Liiduga. Tabel: peamised majandusnäitajad Eestis aastatel 1994 - 2001. Lisad.

  10. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  11. Duck Valley Habitat Enhancement and Protection, 2001-2002 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Allen, Mattie H.; Sellman, Jake (Shoshone-Paiute Nation, Duck Valley Indian Reservation, Owyhee, NV)

    2003-03-01

    The Duck Valley Indian Reservation's Habitat Enhancement project is an ongoing project designed to enhance and protect critical riparian areas, natural springs, the Owhyee River and its tributaries, and native fish spawning areas on the Reservation. The project commenced in 1997 and addresses the Northwest Power Planning Council's measures 10.8C.2, 10.8C.3, and 10.8C.5 of the 1994 Columbia River Basin Fish and Wildlife Program. The performance period covers dates from April 2001 through August 2002.

  12. Trends in Food Habits and Their Relation to Socioeconomic Status among Nordic Adolescents 2001/2002-2009/2010

    DEFF Research Database (Denmark)

    Fismen, Anne-Siri; Smith, Otto Robert Frans; Torsheim, Torbjørn

    2016-01-01

    , collected via three nationally representative and comparable questionnaire surveys in 2001/2002, 2005/2006 and 2009/2010. Food habits were identified by students' consumption of fruit, vegetables, sweets and sugar sweetened soft drink. Socioeconomic status (SES) was measured with the Family Affluence Scale...... at national level. In recent years, social inequalities in food habits have been attracted particular governmental interest and several initiatives addressing the socioeconomic gradient in food habits have been highlighted. However, few internationally published studies have evaluated how trends....../2002-2005/2006 and was stable thereafter. Denmark displayed an increase between 2001/2002-2005/2006 followed by a similar decrease between 2005/2006-2009/2010 for both sweet and soft drink consumption. Socioeconomic inequalities in fruit and vegetable consumption were observed in all countries, with no cross...

  13. International Atomic Energy Agency publications. Publications catalogue 2001-2002, including IAEA technical documents

    International Nuclear Information System (INIS)

    2002-09-01

    This catalogue lists all sales publications of the IAEA issued and forthcoming between January 2001 and September 2002. Most Agency publications are issued in English, though some are also available in Arabic, Chinese, French, Russian or Spanish. The lists all publications by subject category, in alphabetical order within each category

  14. Evaluate Status of Pacific Lamprey in the Clearwater River Drainage, Idaho: Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Cochnauer, Tim; Claire, Christopher

    2002-12-01

    Recent decline of Pacific lamprey Lampetra tridentata adult migrants to the Snake River drainage has focused attention on the species. Adult Pacific lamprey counted passing Ice Harbor Dam fishway averaged 18,158 during 1962-69 and 361 during 1993-2000. Human resource manipulations in the Snake River and Clearwater River drainages have altered ecosystem habitat in the last 120 years, likely impacting the productive potential of Pacific lamprey habitat. Timber harvest, stream impoundment, road construction, grazing, mining, and community development have dominated habitat alteration in the Clearwater River system and Snake River corridor. Hydroelectric projects in the Snake River corridor impact juvenile/larval Pacific lamprey outmigrants and returning adults. Juvenile and larval lamprey outmigrants potentially pass through turbines, turbine bypass/collection systems, and over spillway structures at the four lower Snake River hydroelectric dams. Clearwater River drainage hydroelectric facilities have impacted Pacific lamprey populations to an unknown degree. The Pacific Power and Light Dam on the Clearwater River in Lewiston, Idaho, restricted chinook salmon Oncorhynchus tshawytscha passage in the 1927-1940 period, altering the migration route of outmigrating Pacific lamprey juveniles/larvae and upstream adult migrants (1927-1972). Dworshak Dam, completed in 1972, eliminated Pacific lamprey spawning and rearing in the North Fork Clearwater River drainage. Construction of the Harpster hydroelectric dam on the South Fork of the Clearwater River resulted in obstructed fish passage 1949-1963. Through Bonneville Power Administration support, the Idaho Department of Fish and Game continued investigation into the status of Pacific lamprey populations in Idaho's Clearwater River drainage in 2001. Trapping, electrofishing, and spawning ground redd surveys were used to determine Pacific lamprey distribution, life history strategies, and habitat requirements in the South

  15. Annual report of Naka Fusion Research Establishment from April 1, 2001 to March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Ando, Toshiro; Matsumoto, Hiroshi; Moriyama, Shinichi; Tanaka, Fumiya; Tuda, Takashi; Tsuji, Hiroshi (eds.) [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment

    2002-11-01

    This report provides an overview of research and development activities at Naka Fusion Research Establishment, JAERI, including those performed in collaboration with other research establishments of JAERI, during the period from April 1, 2001 to March 31, 2002. The activities in the Naka Fusion Research Establishment are highlighted by high performance plasma researches in JT-60 and JFT-2M, and completion of ITER Engineering Design Activities (EDA) in July 2001, including technology R and D. (J.P.N.)

  16. Forrest Ranch Management and Implementation, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brent

    2004-01-01

    Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The

  17. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report

    Energy Technology Data Exchange (ETDEWEB)

    Warwick, W.M.

    1995-01-01

    The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

  18. The Indigenous World, 2001-2002 = El Mundo Indigena, 2001-2002.

    Science.gov (United States)

    Vinding, Diana, Ed.; Wessendorff, Kathrin, Ed.; Parellada, Alejandro, Ed.; Erni, Christian, Ed.; Jensen, Marianne, Ed.; Garcia-Alix, Lola, Ed.

    This document contains the English and Spanish texts of an annual publication which examines political, social, environmental, and educational issues concerning indigenous peoples around the world in 2001-02. Part 1 describes current situations and events in 11 world regions: the Arctic; North America; Mexico and Central America; South America;…

  19. The "Isms" of Art. Introduction to the 2001-2002 Clip and Save Art Prints.

    Science.gov (United States)

    Hubbard, Guy

    2001-01-01

    Provides an introduction to the 2001-2002 Clip and Save Art Prints that will focus on ten art movements from the past 150 years. Includes information on three art movements, or "isms": Classicism, Romanticism, and Realism. Discusses the Clip and Save Art Print format and provides information on three artists. (CMK)

  20. Emergency Fish Restoration Project; Final Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  1. Juvenile salmonid monitoring in the White Salmon River, Washington, post-Condit Dam removal, 2016

    Science.gov (United States)

    Jezorek, Ian G.; Hardiman, Jill M.

    2017-06-23

    Condit Dam, at river kilometer 5.3 on the White Salmon River, Washington, was breached in 2011 and removed completely in 2012, allowing anadromous salmonids access to habitat that had been blocked for nearly 100 years. A multi-agency workgroup concluded that the preferred salmonid restoration alternative was natural recolonization with monitoring to assess efficacy, followed by a management evaluation 5 years after dam removal. Limited monitoring of salmon and steelhead spawning has occurred since 2011, but no monitoring of juveniles occurred until 2016. During 2016, we operated a rotary screw trap at river kilometer 2.3 (3 kilometers downstream of the former dam site) from late March through May and used backpack electrofishing during summer to assess juvenile salmonid distribution and abundance. The screw trap captured primarily steelhead (Oncorhynchus mykiss; smolts, parr, and fry) and coho salmon (O. kisutch; smolts and fry). We estimated the number of steelhead smolts at 3,851 (standard error = 1,454) and coho smolts at 1,093 (standard error = 412). In this document, we refer to O. mykiss caught at the screw trap as steelhead because they were actively migrating, but because we did not know migratory status of O. mykiss caught in electrofishing surveys, we simply refer to them as O. mykiss or steelhead/rainbow trout. Steelhead and coho smolts tagged with passive integrated transponder tags were subsequently detected downstream at Bonneville Dam on the Columbia River. Few Chinook salmon (O. tshawytscha) fry were captured, possibly as a result of trap location or effects of a December 2015 flood. Sampling in Mill, Buck, and Rattlesnake Creeks (all upstream of the former dam site) showed that juvenile coho were present in Mill and Buck Creeks, suggesting spawning had occurred there. We compared O. mykiss abundance data in sites on Buck and Rattlesnake Creeks to pre-dam removal data. During 2016, age-0 O. mykiss were more abundant in Buck Creek than in 2009 or

  2. Water Power in The Wilderness: The History of Bonneville Lock and Dam

    Science.gov (United States)

    1997-01-01

    yards of material. Reinforced concrete cutoff walls at each abutment and reinforced concrete coun- terfort type upstream wing walls, along with...at the ends of the dam, the abutment Blasting of boulder no. 8 for navigation channel at Cascade Rapids . walls had to be built over 150 feet high...completion of the entire north section during 1936-37, the contractors placed a prefabricated struc- tural steel cofferdam over the crest section

  3. Outlook 2001

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    ABARE's Executive Director, Brian Fisher in his address at the annual assembly of economists and commodity producers (Outlook 2001) indicated that the world economic growth, which is of critical importance to the direction of world commodity prices, is assumed to ease in 2001 but to strengthen in 2002. Yet despite the slower world economic growth he forecast that Australia's commodity exports would rise to be worth $86 billion in 2000-2001 and $89 billion in 2001 - 2002 reflecting a relatively low Australian dollar. The value of commodity exports is then forecast to trend downwards in real terms for the remainder of the outlook period to 2005-2006. In preparing commodity projections ABARE assumed world economic growth to moderate to around 3.4% in 2001, and then strengthen to 3.9%, in 2002 supported by lower interest rates in key economies. Activity in the Australian economy is assumed to remain reasonably firm in the short term. While growth in domestic demand is likely to moderate, export performance is expected to remain strong. There has been a remarkable improvement in Australia's trade performance during the last year. This improvement is expected to continue in the short term. For energy commodities, export earnings are forecast to increase from $18.4 billion in 1999-2000 to $25.1 billion in 2000-2001 before declining to $24.4 billion in 2001-2002

  4. A epidemia de dengue/dengue hemorrágico no município do Rio de Janeiro, 2001/2002 The epidemic of dengue and hemorrhagic dengue fever in the city of Rio de Janeiro, 2001/2002

    Directory of Open Access Journals (Sweden)

    Clarisse Guimarães Casali

    2004-08-01

    Full Text Available O objetivo deste estudo foi avaliar a ocorrência dos principais sinais e sintomas dos casos de dengue clássico e dengue hemorrágico na epidemia de 2001-2002 do município do Rio de Janeiro. Foram analisados os 155.242 casos notificados ao Sistema de Informações de Agravos de Notificação, desde janeiro/2001, até junho/2002; deste total, excluindo-se os ignorados, 81.327 casos foram classificados como dengue clássico e 958 como dengue hemorrágico, com um total de 54 óbitos. Avaliaram-se as variáveis referentes à sintomatologia da doença. Manifestações gerais como febre, cefaléia, prostração, mialgia, náuseas e dor retro-orbitária tiveram alta incidência tanto no dengue clássico como no dengue hemorrágico. Por outro lado, manifestações hemorrágicas e algumas de maior gravidade como choque, hemorragia digestiva, petéquias, epistaxe, dor abdominal e derrame pleural, estiveram significativamente associadas ao dengue hemorrágico. Além disso, a evolução do quadro clínico para o óbito foi 34,8 vezes maior no dengue hemorrágico que no dengue clássico (OR=34,8; IC 19,7-61,3.The following study was intended to evaluate the occurrence of typical signs and symptoms in the cases of classic dengue and hemorrhagic dengue fever, during the 2001-2002 epidemic in the city of Rio de Janeiro. The authors reviewed 155,242 cases notified to the Information System of Notification Diseases, from January/2001 to June/2002: 81,327 cases were classified as classic dengue and 958 as hemorrhagic dengue fever, with a total of 60 deaths. Common symptoms, such as fever, headache, prostration, myalgia, nausea and retro-orbital pain, had a high incidence in both classic and hemorrhagic dengue fever. On the other hand, hemorrhagic signs and other signs of severe disease, such as shock, gastrointestinal bleeding, petechiae, epistaxis, abdominal pain and pleural effusion, were strongly associated to hemorrhagic dengue fever. Besides, the occurrence

  5. WATER PRODUCTION IN COMETS 2001 Q4 (NEAT) AND 2002 T7 (LINEAR) DETERMINED FROM SOHO/SWAN OBSERVATIONS

    International Nuclear Information System (INIS)

    Combi, M. R.; Lee, Y.; Maekinen, J. T. T.; Bertaux, J.-L.; Quemerais, E.

    2009-01-01

    The SWAN all-sky camera on the Solar and Heliospheric Observatory (SOHO) spacecraft detected the hydrogen Lyman-alpha (Lyα) comae of comets 2001 Q4 NEAT and 2002 T7 LINEAR for large portions of their perihelion apparitions in 2003 and 2004. C/2001 Q4 NEAT was observed from 2003 September 14 through 2004 November 2, covering heliocentric distances from 3.23 AU before perihelion to 2.75 AU after, and C/2002 T7 LINEAR was observed from 2003 December 4 through 2004 August 6, covering heliocentric distances from 2.52 AU before perihelion to 2.09 AU after. We combined the full set of comet specific and full-sky observations and used our time-resolved model (TRM), which enables us to extract continuous values of the daily-average value of the water production rate throughout most of this entire period. The average power-law fit to the production rate variation of C/2001 Q4 NEAT with heliocentric distance, r, gives 3.5 x 10 29 r -1.7 and that for C/2002 T7 LINEAR gives 4.6 x 10 29 r -2.0 . Both comets show roughly a factor of 2 asymmetry in activity about perihelion, being more active before perihelion. C/2001 Q4 NEAT showed a production rate outburst about 30 days before perihelion (2004 April 15) and then a large extended increase above the nominal trend from 50 to 70 days after perihelion (2004 July 5-July 25).

  6. Lower Klickitat Riparian and In-channel Habitat Restoration Project, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Conley, Will

    2003-10-01

    This project focuses on the lower Klickitat River and its tributaries that provide or affect salmonid habitat. The overall goal is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of watersheds supporting anadromous fish production, particularly steelhead (Oncorhyncus mykiss) which are listed as 'Threatened' within the Mid-Columbia ESU. Restoration activities are aimed at restoring stream processes by removing or mitigating watershed perturbances and improving habitat conditions and water quality. In addition to steelhead, habitat improvements benefit Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout, and enhance habitat for many terrestrial and amphibian wildlife species. Protection activities compliment restoration efforts within the subbasin by securing refugia and preventing degradation. Since 90% of the project area is in private ownership, maximum effectiveness will be accomplished via cooperation with state, federal, tribal, and private entities. The project addresses goals and objectives presented in the Klickitat Subbasin Summary and the 1994 NWPPC Fish and Wildlife Program. Feedback from the 2000 Provincial Review process indicated a need for better information management to aid development of geographic priorities. Thus, an emphasis has been placed on database development and a review of existing information prior to pursuing more extensive implementation. Planning and design was initiated on several restoration projects. These priorities will be refined in future reports as the additional data is collected and analyzed. Tasks listed are for the April 1, 2001 to August 31, 2002 contract cycle, for which work was delayed during the summer of 2001 because the contract was not finalized until mid-August 2001. Accomplishments are provided for the September 1, 2001 to August 31, 2002 reporting period. During this reporting period

  7. Flow Velocity Water Temperature, and Conductivity in Shark River Slough, Everglades National Park, Florida: August 2001-June 2002

    National Research Council Canada - National Science Library

    Riscassi, Ami L; Schaffranek, Raymond W

    2003-01-01

    ...." Data collected at four locations in Shark River Slough, Everglades National Park during the 2001 -2002 wet season are documented in the report and methods used to process the data are described...

  8. Energy balances of non-OECD countries, 2001-2002. 2004 edition

    International Nuclear Information System (INIS)

    2004-01-01

    This volume contains data on the supply and consumption of coal, oil, gas, electricity, heat, renewables and waste presented as comprehensive energy balances, expressed in tonnes of oil equivalent for over 100 non-OECD countries. Historical tables summarize production, trade and final consumption data as well as key energy and economic indicators. This book includes definitions of products and flows, explanatory notes on the individual country data and conversion factors from original units to tonnes of oil equivalent. More detailed data in original units are published in Energy Statistics of Non-OECD Countries 2001-2002, the sister volume of this publication. Bi-lingual edition: English - French. In general the CD-Rom and on-line service contain detailed time-series back to 1971

  9. Legacy Panorama on Spirit's Way to 'Bonneville'

    Science.gov (United States)

    2005-01-01

    [figure removed for brevity, see original site] Click on the image for Legacy Panorama on Spirit's Way to 'Bonneville' (QTVR) This view captured by the panoramic camera on NASA's Mars Exploration Rover Spirit nearly a year ago is called Spirit's 'Legacy' panorama. It combines many frames acquired during Spirit's 59th through 61st martian days, or sols (March 3 to 5, 2004) from a position about halfway between the landing site and the rim of 'Bonneville Crater.' The location is within the transition from the relatively smooth plains to the more rocky and rugged blanket of material ejected from Bonneville by the force of the impact that dug the crater. The panorama spans 360 degrees and consists of images obtained in 78 individual pointings. The camera took images though 5 different filter at each pointing. This mosaic is an approximately true-color rendering generated using the images acquired through filters centered at wavelengths of 750, 530, and 480 nanometers. The Columbia Memorial Station lander can be seen about 200 meters (about 650 feet) in the distance by following the rover tracks back toward right of center in the mosaic and zooming in.

  10. Nuclear energy system department annual report. April 1, 2001 - March 31, 2002

    International Nuclear Information System (INIS)

    Nakajima, Hajime; Ohnuki, Akira; Kunii, Katsuhiko

    2003-03-01

    This report summarizes the research and development activities in the Department of Nuclear Energy System during the fiscal year of 2001 (April 1, 2001 - March 31, 2002). The Department has been organized from April 1998. The main research activity is aimed to build the basis of the development of future nuclear energy systems. The research activities of the Department cover basic nuclear data evaluation, conceptual design of a reduced-moderation water reactor, reactor physics experiments and development of the reactor analysis codes, experiment and analysis of thermal-hydrodynamics, energy system analysis and assessment, development of advanced materials for a reactor, lifetime reliability assessment on structural material, development of advanced nuclear fuel, design of a marine reactor and the research for a nuclear ship system. The maintenance and operation of reactor engineering facilities belonging to the Department are undertaken. The activities of the research committees to which the Department takes a role of secretariat are also summarized in this report. (author)

  11. Comparison of the November 2002 Denali and November 2001 Kunlun Earthquakes

    Science.gov (United States)

    Bufe, C. G.

    2002-12-01

    Major earthquakes occurred in Tibet on the central Kunlun fault (M 7.8) on November 14, 2001 (Lin and others, 2002) and in Alaska on the central Denali fault (M 7.9) on November 3, 2002. Both earthquakes generated large surface waves (Kunlun Ms 8.0 (USGS) and Denali Ms 8.5). Each event occurred on east-west-trending strike-slip faults and exhibited nearly unilateral rupture propagating several hundred kilometers from west to east. Surface rupture length estimates were about 400 km for Kunlun, 300 km for Denali. Maximum surface faulting and moment release were observed far to the east of the points of rupture initiation. Harvard moment centroids were located east of USGS epicenters by 182 km (Kunlun) and by 126 km (Denali). Maximum surface faulting was observed near 240 km (Kunlun, 16 m left lateral) and near 175 km (Denali, 9 m right lateral) east of the USGS epicenters. Significant thrust components were observed in the initiation of the Denali event (ERI analysis and mapped thrust) and in the termination of the Kunlun rupture, as evidenced by thrust mechanisms of the largest aftershocks which occurred near the eastern part of the Kunlun rupture. In each sequence the largest aftershock was about 2 orders of magnitude smaller than the mainshock. Moment release along the ruptured segments was examined for the 25-year periods preceding the main shocks. The Denali zone shows precursory accelerating moment release with the dominant events occurring on October 22, 1996 (M 5.8) and October 23, 2002 (M 6.7). The Kunlun zone shows nearly constant moment release over time with the last significant event before the main shock occurring on November 26, 2000 (M 5.4). Moment release data are consistent with previous observations of annual periodicity preceding major earthquakes, possibly due to the evolution of a critical state with seasonal and tidal triggering (Varnes and Bufe, 2001). Annual periodicity is also evident for the larger events in the greater San Francisco Bay

  12. Nonradioactive Ambient Air Monitoring at Los Alamos National Laboratory 2001--2002

    Energy Technology Data Exchange (ETDEWEB)

    E. Gladney; J.Dewart, C.Eberhart; J.Lochamy

    2004-09-01

    During the spring of 2000, the Cerro Grande forest fire reached Los Alamos National Laboratory (LANL) and ignited both above-ground vegetation and disposed materials in several landfills. During and after the fire, there was concern about the potential human health impacts from chemicals emitted by the combustion of these Laboratory materials. Consequently, short-term, intensive air-monitoring studies were performed during and shortly after the fire. Unlike the radiological data from many years of AIRNET sampling, LANL did not have an adequate database of nonradiological species under baseline conditions with which to compare data collected during the fire. Therefore, during 2001 the Meteorology and Air Quality Group designed and implemented a new air-monitoring program, entitled NonRadNET, to provide nonradiological background data under normal conditions. The objectives of NonRadNET were to: (1) develop the capability for collecting nonradiological air-monitoring data, (2) conduct monitoring to develop a database of typical background levels of selected nonradiological species in the communities nearest the Laboratory, and (3) determine LANL's potential contribution to nonradiological air pollution in the surrounding communities. NonRadNET ended in late December 2002 with five quarters of data. The purpose of this paper is to organize and describe the NonRadNET data collected over 2001-2002 to use as baseline data, either for monitoring during a fire, some other abnormal event, or routine use. To achieve that purpose, in this paper we will: (1) document the NonRadNET program procedures, methods, and quality management, (2) describe the usual origins and uses of the species measured, (3) compare the species measured to LANL and other area emissions, (4) present the five quarters of data, (5) compare the data to known typical environmental values, and (6) evaluate the data against exposure standards.

  13. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2004-09-01

    a benefit for steelhead. Survivals for spring fish in the Lower Granite to McNary Dam and the McNary to Bonneville Dam reach were similar to recent years. Returning numbers of adult spring and summer chinook, coho and steelhead were less than observed in 2002, but far exceeded the ten-year average return numbers. Sockeye numbers were less than both the 2002 returning adults and the ten-year average number. However, fall chinook numbers surpassed all previous counts at Bonneville Dam since 1938. In 2003, about 81 million juvenile salmon were released from Federal, State, tribal or private hatcheries into the Columbia River Basin above Bonneville Dam. This was slightly less than the number released last year, but about average for the past several years.

  14. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Loxterman, Janet (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-05-01

    In chapter 1 we report on studies of the population genetic structure, using DNA microsatellites, of steelhead collected from different locations in the Yakima River basin (Roza Dam, Ahtanum Creek, Toppenish Creek, and Satus Creek) in 2000 and 2001. Of 28 pairwise tests of genotypic differentiation, only the 2000 and 2001 Roza Dam collections and the 2000 and 2001 Satus Creek collections did not exhibit significant differences. Similarly, pairwise tests of genetic differentiation (FST) were significant for all comparisons except the between-years comparisons of Roza Dam, Toppenish Creek, and Satus Creek collections. All tests between populations sampled from different localities were significant, indicating that these collections represent genetically differentiated stocks. In chapter 2 we report on genetic comparisons, again using microsatellites, of the three spring chinook populations in the Yakima basin (Upper Yakima, Naches, and American) with respect to our ability to be able to estimate the proportions of the three populations in mixed smolt samples collected at Chandler. We evaluated this both in terms of mixed fishery analysis, where proportions are estimated, but the likely provenance of any particular fish is unknown, and classification, where an attempt is made to assign individual fish to their population of origin. Simulations were done over the entire ranged of stock proportions observed in the Yakima basin in the last 20+ years. Stock proportions can be estimated very accurately by either method. Chapter 3 reports on our ongoing effort at cryopreserving semen from wild Upper Yakima spring chinook. In 2002, semen from 91 males, more than 50% of those spawned, was cryopreserved. Representation over the spawning season was excellent. Chapters 4,5, and 6 all relate to the continuing development of the domestication study design. Chapter 4 details the ISRP consultations and evolution of the design from last year's preferred alternative to the

  15. Nuclear Engineering Academic Programs Survey, 2002 Data

    International Nuclear Information System (INIS)

    Oak Ridge Institute for Science and Education

    2003-01-01

    The survey includes degrees granted between July 1, 2001 and June 30, 2002. Enrollment information refers to the fall term 2002. Thirty-five academic programs were in the survey universe and all responded (100% response rate). One of the 35 programs reported that it was discontinued after the 2001-2002 academic year. Also, two programs were discontinued after the previous academic year (2000-2001) and were not included in 2002 survey

  16. Lower Granite dam smolt monitoring program: annual report, 2000; ANNUAL

    International Nuclear Information System (INIS)

    Morrill, Charles

    2000-01-01

    The 2000 fish collection season at Lower Granite was characterized by lower than average spring flows and spill, low levels of debris, cool water temperatures, increased unclipped yearling and subyearling chinook smolts, and 8,300,546 smolts collected and transported compared to 5,882,872 in 1999. With the continued release of unclipped supplementation chinook and steelhead above Lower Granite Dam, we can no longer accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. Although some table titles in this report still show ''wild'' column headings, the numbers in these columns for 1999 and 2000 include wild and unclipped hatchery origin smolts. The increases over previous years reflect the increased supplementation. A total of 8,300,546 juvenile salmonids were collected at Lower Granite Dam. Of these, 187,862 fish were bypassed back to the river and 7,950,648 were transported to release sites below Bonneville Dam, 7,778,853 by barge and 171,795 by truck. A total of 151,344 salmonids were examined in daily samples. Nine research projects conducted by four agencies impacted a total of 1,361,006 smolts (16.4% of the total collection)

  17. Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Smolts, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Achord, Stephen; McNatt, Regan A.; Hockersmith, Eric E. (National Marine Fisheries Service, Northwest Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2004-04-01

    estimate survival of different wild juvenile fish stocks as they emigrate from their natal rearing areas. This study provides critical information for recovery planning, and ultimately recovery for these ESA-listed wild fish stocks. This report provides information on PIT tagging of wild chinook salmon parr in 2002 and the subsequent monitoring of these fish. Fish were monitored as they migrated through two in-stream PIT-tag monitoring systems in lower Valley Creek and at juvenile migrant traps in 2002 and 2003 as well as through interrogation systems at Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Dams during 2003. Fish were also monitored by the PIT-tag trawl in the mouth of the Columbia River in 2003. In 2002-2003, we also continued to collect environmental data for the Baseline Environmental Monitoring Program, which was developed from 1993 to 1997. The project was designed to collect data for use in conjunction with data on parr and smolt movements to discern patterns or characteristic relationships between these movements and environmental factors. Water quality data collected consist of water temperature, dissolved oxygen, specific conductance, turbidity, water depth, and pH measured at five monitoring stations in the Salmon River Basin, Idaho.

  18. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Conger, R.L.

    1996-06-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  19. Staff Members with more than 25 years service at CERN in 2001 and 2002

    CERN Multimedia

    2002-01-01

    Staff Members with 25 years service in 2002 were invited by the Director-General to a reception in their honnor on the 20th November 2002 : Baulet Yves / ST Bornand Michel / SL Burdet Georges / ST Carena Francesco / EP Chanut Robert / LHC Chauchaix Bruno / SL Chevrier François / SL Chohan Vinod / LHC Dahlerup-Petersen Knud / LHC De Gennaro Michele Silvano / IT De Rujula Alvaro / TH Dury Jean-Marie / SL Ferrara Sergio / TH Fraser Gordon / ETT Kolly Michel / ST Korda Gwendoline / DSU Lager Michel / ST Michelon Jean-Claude / SL Montuelle Jean / IT Naudi Andre John / FI Seis Irene / IT Vascotto Alessandro / EP Vernamonte Donatino / ST Von Rüden Wolfgang / IT Vullierme Bruno / LHC Staff members with 25 years service in 2001 were also invited: Datta-Cockerill Sudeshna / HR Frost-Ainley Lio / IT Laurent Moniek / HR Saban Roberto / AC

  20. Staff Members with more than 25 years service at CERN in 2001 and 2002

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Staff Members with 25 years service in 2002 were invited by the Director-General to a reception in their honnor on the 20th November 2002 : Baulet Yves / ST, Bornand Michel / SL, Burdet Georges / ST, Carena Francesco / EP, Chanut Robert / LHC, Chauchaix Bruno / SL, Chevrier François / SL, Chohan Vinod / LHC, Dahlerup-Petersen Knud / LHC, De Gennaro Michele Silvano / IT, De Rujula Alvaro / TH, Dury Jean-Marie / SL, Ferrara Sergio / TH, Fraser Gordon / ETT, Kolly Michel / ST, Korda Gwendoline / DSU, Lager Michel / ST, Michelon Jean-Claude / SL, Montuelle Jean / IT, Naudi Andre John / FI, Seis Irene / IT, Vascotto Alessandro / EP, Vernamonte Donatino / ST, Von Rüden Wolfgang / IT, Vullierme Bruno / LHC. Staff members with 25 years service in 2001 were also invited: Datta-Cockerill Sudeshna / HR, Frost-Ainley Lio / IT, Laurent Moniek / HR, Saban Roberto / AC.

  1. Environmental Sensitivity Index (ESI) Atlas (2): Cook Inlet - 2002, Kodiak - 1998, Southeast - 2002, Bristol Bay - 2004, Prince William Sound - 2000, Aleutians - 2001, maps and geographic information systems data (NODC Accession 0050372)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set comprises the Environmental Sensitivity Index (ESI) data for Alaska; Kodiak (1998), Prince William Sound (2000), Aleutians (2001), Cook Inlet (2002),...

  2. Fuels. Deliveries and consumption of fuels during 4th quarter 2002 and year 2002

    International Nuclear Information System (INIS)

    2003-01-01

    The total volume of oil product deliveries (excluded lubricants, bitumen etc.) from the oil companies was 1 per cent lower during 2002 compared with 2001. The deliveries of motor gasoline and diesel oil increased by 2 and 5 per cent. Domestic heating oil and heavy fuel oils decreased by 3 and 5 per cent compared with 2001. Under the 4th quarter 2002 the deliveries of oil products (excluded lubricants, bitumen etc.) was 10 per cent higher compared with the same quarter 2001. The deliveries of domestic heating oil and heavy fuel oils increased by 22 per cent in each case. Motor gasoline was unchanged while the deliveries of diesel oil increased by 7 per cent. The consumption of fuels in mining and manufacturing increased by 3 % during the year 2002. The consumption of hard coal and coke increased by 5 % and the rest of the fossil fuels by 7 %. Renewable fuels decreased by 1 %. During the 4th quarter 2002 increased the fuel consumption in industry by 2 % compared with same quarter 2001. Renewable fuels decreased by 7 % while fossil fuels increased by 18 %. The consumption of fuels in electricity, gas and district heating services increased by 12 % during 2002. The consumption of oils increased by 16 %. During year 2002 the renewable fuels accounts for 68 % of the final consumption. During the 4th quarter the consumption of fuels was almost twice as high as the consumption during the 4th quarter 2001

  3. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    International Nuclear Information System (INIS)

    Englin, J.E.; Gygi, K.F.

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs

  4. Emigration of Natural and Hatchery Chinook Salmon and Steelhead Smolts from the Imnaha River, Oregon, Progress Report 2000-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Cleary, Peter; Kucera, Paul; Blenden, Michael

    2003-12-01

    ,769 hatchery chinook salmon released in 2002 survived to the lower trap. Post release survival estimates for hatchery chinook salmon were within the range of past estimates; 88.4% in 1998 to 100.9% in 1994. An estimated 7,646 to 23,249 (95% C.I.) natural chinook salmon smolts migrated past the lower Imnaha River trap from April 4 to April 22. An additional 6,767 to 14,706 (95% C.I.) natural chinook salmon smolts migrated past the lower Imnaha River trap from April 23 to May 14, 2002. Natural chinook salmon captured and tagged at the upper rkm 74 trap survived to Lower Granite Dam (LGR) at a rate of 28.8% during migration year 2001 and 21.9% during migration year 2002. The survival estimate for fall tagged natural chinook salmon from the lower trap to LGR was 41.9% in 2001 and 33.3% in 2002. Differences between survival from release to LGR for fall tagged natural chinook salmon from the lower trap have been 5.9% to 16.9% higher than for fall tagged natural chinook salmon from the upper trap from 1994 to 2002. Spring PIT tag release groups of natural chinook salmon, hatchery chinook salmon, and hatchery steelhead produced estimates of survival from the trap to LGR within the range of past estimates since 1993. Estimated survival from release to LGR for 2001 and 2002 were as follows: 83.7% and 86.9% for natural chinook salmon, 80.3% and 77.3% for hatchery chinook salmon, 82.7% and 81.8% for natural steelhead, and 82.0% and 83.0% for hatchery steelhead. Estimates of survival for spring tagged fish from the trap to Lower Monumental Dam (LMO) during the drought of 2001 were the lowest estimates of survival from 1998 to 2002 for natural chinook salmon, and from1997 to 2002 for natural and hatchery steelhead. Estimates of migration year 2001 survival from the trap to LMO were as follows: 65.6% - natural chinook salmon, 68.9% - hatchery chinook salmon, 49.7% natural steelhead, and 42.9% - hatchery steelhead. Estimates of migration year 2002 survival from the trap to LMO were as follows

  5. System-Wide Significance of Predation on Juvenile Salmonids in Columbia and Snake River Reservoirs : Annual Report 1992.

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, James H.; Poe, Thomas P.

    1993-12-01

    Northern squawfish (Ptychocheilus oregonensis) predation on juvenile salmonids was characterized during 1992 at ten locations in the Columbia River below Bonneville Dam and at three locations in John Day Reservoir. During the spring and summer, 1,487 northern squawfish were collected in the lower Columbia River and 202 squawfish were sampled in John Day Reservoir. Gut content data, predator weight, and water temperature were used to compute a consumption index (CI) for northern squawfish, and overall diet was also described. In the Columbia River below Bonneville Dam, northern squawfish diet was primarily fish (spring 69%; summer 53%), most of which were salmonids. Salmonids were also the primary diet component in the Bonneville Dam tailrace, John Day Dam forebay, and the McNary Dam tailrace. Crustaceans were the dominant diet item at the John Day mid-reservoir location, although sample sizes were small. About half of the non-salmonid preyfish were sculpins. The consumption index (CI) of northern squawfish was generally higher during summer than during spring. The highest CI`s were observed during summer in the tailrace boat restricted zones of Bonneville Dam (CI = 7.8) and McNary Dam (CI = 4.6). At locations below Bonneville Dam, CI`s were relatively low near Covert`s Landing and Rooster Rock, higher at four locations between Blue Lake and St. Helens, and low again at three downriver sites (Kalama, Ranier, and Jones Beach). Northern squawfish catches and CI`s were noticeably higher throughout the lower Columbia compared to mid-reservoir sites further upriver sampled during 1990--92. Predation may be especially intense in the free-flowing section of the Columbia River below Bonneville Dam. Smallmouth bass (Micropterus dolomieui; N = 198) ate mostly fish -- 25% salmonids, 29% sculpins, and 46% other fish. Highest catches of smallmouth bass were in the John Day Dam forebay.

  6. Utilization of substance abuse treatment services under Medicare, 2001-2002.

    Science.gov (United States)

    Vandivort, Rita; Teich, Judith L; Cowell, Alexander J; Chen, Hong

    2009-06-01

    In 2006, the Medicare program covered 37 million elderly persons and 7 million persons younger than 65 years, but little is known about substance abuse (SA) service utilization. Using the 5% Sample of Medicare claims data, the study examines individuals who used SA detoxification ("detox") and/or rehabilitation ("rehab") services under Medicare in 2001 and 2002. SA claimants less than 65 years of age (disabled) were compared to claimants more than 65 years of age (elderly). The disabled were more likely to have a co-occurring mental disorder than elderly claimants (50% vs. 14%) and more likely to have serious mental illness (21% vs. 2.3%). Disabled claimants were more than three times as likely to receive any detox service as elderly claimants (17% vs. 6%). The rate of claimants receiving rehab services within 30 days of detox is about one third for disabled claimants and one quarter for elderly claimants.

  7. French electricity results 2002

    International Nuclear Information System (INIS)

    2002-01-01

    RTE, the manager of the French power system, announces a high increase in electricity exports to the other countries of the European Union in 2002. In France, the year 2002 was marked by stable power consumption, but a noteworthy increase in generation due to the rise of exports. In 2002, the RTE network conveyed 512.3 billion kWh (TWh) versus 503.1 billion kWh (TWh) in 2001, an increase of 1.8%. Overall French exports made considerable strides forward from 72.9 TWh in 2001 to 80.6 TWh in 2002, i.e. 10.6% more than in 2001. On the other hand, overall French imports fell substantially, from 4.4 TWh in 2001 to 3.8 TWh in 2002, or a drop of about 14%. In all, the export balance came to 76.8 TWh in 2002, versus 68.5 TWh in 2001, i.e. a rise of 12%. On Sunday, 22 December 2002, the historical record of the capacity export balance with a value of 13,277 MW, up 2.2%, was bettered. The particularly mild weather conditions in 2002 led to a drop in heating-related consumption, evaluated at 7 billion kWh compared with the prior year. A slight upturn in industrial consumption was to be noted, from 92.7 TWh in 2001 to 93.2 TWh in 2002, i.e. a growth of 0.5%. Total French consumption thus rose in 2002 to 448.7 TWh. Total consumption, adjusted for climate contingencies, showed a rise of 1.6% in 2002. French power producers showed an increase of nearly 2% and the first wind farm was connected to the power transmission network. French electricity output came to 532.9 TWh in 2002, a growth of 1.9%. This increase is divided up between nuclear generation, up 4%, and conventional thermal generation, on the rise by 15.3%. The substantial share of thermal generation can be explained by a correlative drop in hydro generation (less 16.6% compared with 2001) mainly due to extremely low water availability observed during the first months of the year. With 415.5 TWh in output, nuclear power plants provided 78% of French generation, fossil-fired power plants 9.9% with an output of 52.9 TWh

  8. Hydrological modeling of the Simly Dam watershed (Pakistan using GIS and SWAT model

    Directory of Open Access Journals (Sweden)

    Shimaa M. Ghoraba

    2015-09-01

    Full Text Available Modern mathematical models have been developed for studying the complex hydrological processes of a watershed and their direct relation to weather, topography, geology and land use. In this study the hydrology of Simly Dam watershed located in Saon River basin at the north-east of Islamabad is modeled, using the Soil and Water Assessment Tool (SWAT. It aims to simulate the stream flow, establish the water balance and estimate the monthly volume inflow to Simly Dam in order to help the managers to plan and handle this important reservoir. The ArcSWAT interface implemented in the ArcGIS software was used to delineate the study area and its sub-components, combine the data layers and edit the model database. The model was calibrated from 1990 to 2001 and evaluated from 2002 to 2011. Based on four recommended statistical coefficients, the evaluation indicates a good performance for both calibration and validation periods and acceptable agreement between measured and simulated values of both annual and monthly scale discharge. The water balance components were correctly estimated and the Simly Dam inflow was successfully reproduced with Coefficient of Determination (R2 of 0.75. These results revealed that if properly calibrated, SWAT model can be used efficiently in semi-arid regions to support water management policies.

  9. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    International Nuclear Information System (INIS)

    Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2004-01-01

    This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes)

  10. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2004-01-01

    This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

  11. Characterizing the Fish Passage Environment at The Dalles Dam Spillway: 2001-2004

    Energy Technology Data Exchange (ETDEWEB)

    Richmond, Marshall C.; Carlson, Thomas J.; Serkowski, John A.; Cook, Chris B.; Duncan, Joanne P.; Perkins, William A.

    2007-10-10

    The spill environment at The Dalles Dam in 2001-2004 was characterized using a field-deployed autonomous sensor (the so-called Sensor Fish), computational fluid dynamics (CFD) modeling, and Lagrangian particle tracking. The sensor fish has a self-contained capability to digitally the record pressure and triaxial accelerations it was exposed to following its release into the spillway. After recovery downstream of the tailrace, the data stored in the memory of the sensor are downloaded and stored for analysis. The spillway, stilling basin, and tailrace hydrodynamics were simulated using an unsteady, free-surface, three-dimensional CFD code that solved the Reynolds-averaged Navier-Stokes equations in conjunction with a two-equation turbulence model. The results from the CFD simulations were then used in a Lagrangian particle tracking model that included the effects of mass, drag, and buoyancy in the particle equation of motion. A random walk method was used to simulate the effects of small-scale turbulence on the particle motion. Several operational and structural conditions were evaluated using the Sensor Fish, CFD, and particle tracking. Quantifying events such as strike and stilling basin retention time characterized exposure conditions in the spill environment.

  12. Bonneville Power Administration 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  13. Social implications of the Human Genome Project: Policy roundtable series and journals. Final progress report, March 15, 2001 - March 15, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Seiguer, Erica

    2002-12-30

    This report reflects the activities of the Harvard Health Caucus at Harvard Medical School that were supported, in part, by the Department of Energy. The following policy roundtables and panels were held: Spring 2001 Policy Roundtable Series: The social implications of the Human Genome Project; Spring 2002 Policy Roundtable Series: Managing globalization to improve health; 13 February 2002 Keynote Address: The globalization of health; 25 February 2002 Healthier or Wealthier: Which comes first in the new global era?; 28 February 2002 The crisis of neglected diseases: Creating R&D incentives for diseases of developing countries; 7 March 2002 Health care education in the developing world: Bridging global and local health care practices; 20 March 2002 Building a legal framework for global health: How can the US and UN work to reduce global disparities?; 25 April 2002 The role of mass media and tobacco control efforts. Caucus organizational information is also included.

  14. POLA PEMBERIAN ANTIBIOTIKA PENGOBATAN DEMAM TIFOID ANAK DI RUMAH SAKIT FATMAWATI JAKARTA TAHUN 20012002

    Directory of Open Access Journals (Sweden)

    Ascobat Gani

    2004-06-01

    Full Text Available The Pattern of the Use of Antibiotics in the Treatment of Children with Typhoid Fever in Fatmawati Hospital Jakarta, 2001-2002. This study was a retrospective study using a descriptive design on the treatment of typhoid fever involving 182 children at Fatmawati Hospital Jakarta. Chloramphenicol was still the drug of choice againts Salmolella typhi. It was also shown that ceftriaxone was an alternative drug used rather frequently for typhoid fever in children.

  15. La violencia y los movimientos sociales en el gobierno de Vicente Fox, 2001-2002

    Directory of Open Access Journals (Sweden)

    Mario Alberto Velázquez García

    2004-01-01

    Full Text Available El objetivo del presente artículo es analizar el movimiento social contra la construcción del aeropuerto en San Salvador Atenco entre 2001 y 2002. Este movimiento es la primera movilización social que enfrenta el presidente Vicente Fox. Se examinan los recursos utilizados en sus acciones, lo que incluye la utilización de la violencia y las consecuencias que tuvo para la imagen presidencial; se emplea la teoría de movilización de recursos para observar las formas de manifestación utilizadas frente al Estado.

  16. Ground source heat pump retrofit at North Bonneville, WA City Hall

    Energy Technology Data Exchange (ETDEWEB)

    Hughey, M. [Skamania Co. PUD No. 1, Carson, WA (United States)

    1997-12-31

    In 1995, the City of North Bonneville, WA installed a 10-ton Ground Source Heat Pump (GSHP) to replace the electric resistance furnace in its 4,000 square, foot City Hall. North Bonneville is 30 miles east of Portland, Oregon, at river level in the Columbia River Gorge. Funded jointly by the Bonneville Power Administration, the State of Washington and the City, this project has successfully reduced the heating cost of City Hall by nearly one-half while dramatically increasing comfort. It has become a commercial model in the Pacific Northwest for assessing values of commercial GSHP retrofits. This interim report compares estimated savings with actual experience for the first operating year. Projected savings were $1,500; actual savings were $1,390 prior to adjustment for extreme weather. Adjusted savings for Heating Year 1996 were $1,490, a 47 percent decrease. Maintenance savings (not itemized) were in addition to this amount. Monitoring continues in 1997.

  17. Intensity modulated radiotherapy (IMRT) in France: the boost of the national funding for the new expensive innovative technologies (STIC 2001 and 2002)

    International Nuclear Information System (INIS)

    Marchal, C.; Lapeyre, M.; Bensadoun, R.J.; Gerard, J.P.; Hasle, E.; Carrere, M.O.

    2003-01-01

    The STIC 2001 and STIC 2002 projects intend to allow the implementation and the assessment of Intensity Modulated Radiation Therapy in France. IMRT is an innovative technique in which the high-dose radiation volume conforms to an accurately defined target volume with less morbidity to the surrounding normal tissues. The main medical objectives of the projects are (1) to improve the therapeutic index while decreasing acute toxicity and late sequelae (mainly xerostomia and acute mucite for head and neck tumors), which allows an increase in the radiation dose to the tumor and then a better tumor control; (2) to propose a salvage treatment to patients who locally recurred in previously irradiated sites; (3) to determine the optimal treatment guidelines for a safe use of the technique in clinical routine. Our projects also aim at comparing IMRT and 3D conformal treatments on the one hand (STIC 2001), and IMRT and conventional treatments on the other hand (STIC 2002), with regard to costs. As a matter of fact, the use of IMRT is presently limited in France because its implementation requires high investment and personnel costs. The seventeen French Regional Cancer Centres involved in the two projects intend to study the additional cost of the use IMRT in comparison with the use of standard techniques, which appears to be a step for a wide use of this technique in France. Each of the studies is two-year prospective, and includes patients with head and neck tumors treated with a curative intend (post operative or exclusive treatments for STIC 2002 and STIC 2002), and patients with a prostate cancer (STIC 2001). (author)

  18. Computational fluid dynamics simulations of the Late Pleistocene Lake Bonneville flood

    Science.gov (United States)

    Abril-Hernández, José M.; Periáñez, Raúl; O'Connor, Jim E.; Garcia-Castellanos, Daniel

    2018-01-01

    At approximately 18.0 ka, pluvial Lake Bonneville reached its maximum level. At its northeastern extent it was impounded by alluvium of the Marsh Creek Fan, which breached at some point north of Red Rock Pass (Idaho), leading to one of the largest floods on Earth. About 5320 km3 of water was discharged into the Snake River drainage and ultimately into the Columbia River. We use a 0D model and a 2D non-linear depth-averaged hydrodynamic model to aid understanding of outflow dynamics, specifically evaluating controls on the amount of water exiting the Lake Bonneville basin exerted by the Red Rock Pass outlet lithology and geometry as well as those imposed by the internal lake geometry of the Bonneville basin. These models are based on field evidence of prominent lake levels, hypsometry and terrain elevations corrected for post-flood isostatic deformation of the lake basin, as well as reconstructions of the topography at the outlet for both the initial and final stages of the flood. Internal flow dynamics in the northern Lake Bonneville basin during the flood were affected by the narrow passages separating the Cache Valley from the main body of Lake Bonneville. This constriction imposed a water-level drop of up to 2.7 m at the time of peak-flow conditions and likely reduced the peak discharge at the lake outlet by about 6%. The modeled peak outlet flow is 0.85·106 m3 s−1. Energy balance calculations give an estimate for the erodibility coefficient for the alluvial Marsh Creek divide of ∼0.005 m y−1 Pa−1.5, at least two orders of magnitude greater than for the underlying bedrock at the outlet. Computing quasi steady-state water flows, water elevations, water currents and shear stresses as a function of the water-level drop in the lake and for the sequential stages of erosion in the outlet gives estimates of the incision rates and an estimate of the outflow hydrograph during the Bonneville Flood: About 18 days would have been required for the

  19. Computational Fluid Dynamics simulations of the Late Pleistocene Lake Bonneville Flood

    Science.gov (United States)

    Abril-Hernández, José M.; Periáñez, Raúl; O'Connor, Jim E.; Garcia-Castellanos, Daniel

    2018-06-01

    At approximately 18.0 ka, pluvial Lake Bonneville reached its maximum level. At its northeastern extent it was impounded by alluvium of the Marsh Creek Fan, which breached at some point north of Red Rock Pass (Idaho), leading to one of the largest floods on Earth. About 5320 km3 of water was discharged into the Snake River drainage and ultimately into the Columbia River. We use a 0D model and a 2D non-linear depth-averaged hydrodynamic model to aid understanding of outflow dynamics, specifically evaluating controls on the amount of water exiting the Lake Bonneville basin exerted by the Red Rock Pass outlet lithology and geometry as well as those imposed by the internal lake geometry of the Bonneville basin. These models are based on field evidence of prominent lake levels, hypsometry and terrain elevations corrected for post-flood isostatic deformation of the lake basin, as well as reconstructions of the topography at the outlet for both the initial and final stages of the flood. Internal flow dynamics in the northern Lake Bonneville basin during the flood were affected by the narrow passages separating the Cache Valley from the main body of Lake Bonneville. This constriction imposed a water-level drop of up to 2.7 m at the time of peak-flow conditions and likely reduced the peak discharge at the lake outlet by about 6%. The modeled peak outlet flow is 0.85·106 m3 s-1. Energy balance calculations give an estimate for the erodibility coefficient for the alluvial Marsh Creek divide of ∼0.005 m y-1 Pa-1.5, at least two orders of magnitude greater than for the underlying bedrock at the outlet. Computing quasi steady-state water flows, water elevations, water currents and shear stresses as a function of the water-level drop in the lake and for the sequential stages of erosion in the outlet gives estimates of the incision rates and an estimate of the outflow hydrograph during the Bonneville Flood: About 18 days would have been required for the outflow to grow from 10

  20. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rien, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-03-01

    We report on our progress from April 2004 through March 2005 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  1. White Sturgeon Mitgation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2005-08-01

    We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  2. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2003-03-01

    This report presents results for year eleven in a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible.

  3. Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Sears, Sheryl

    2003-01-01

    County Conservation District, and Ferry County. The Bonneville Power Administration (BPA) provided project funding support and program integration assistance. A stock of redband rainbow trout, were discovered in 2001 in an isolated section of Bridge Creek above a set of waterfalls. DNA microsatellite analysis was conducted at the University of Idaho and indicated that very little if any hybridization. The targeted species in the genetic analysis was red band/rainbow trout (Oncorhynchus mykiss spp.). The sub-contract is with Madison Powell and Joyce Faler at the Center for Salmonid and Freshwater Species at Risk at the University of Idaho/HFCES. DNA analysis used mitochondrial and nuclear RFLP markers along with two microsatellite loci. Sample populations were screened for detectable levels of introgressive hybridization arising from possible admixtures of hatchery rainbow trout with native red band trout.

  4. 78 FR 39279 - United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

    Science.gov (United States)

    2013-07-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ13-10-000] United States Department of Energy; Bonneville Power Administration; Notice of Petition for Declaratory Order Take notice... (OATT) and a Petition for Declaratory Order requesting the Commission find that Bonneville's OATT, as...

  5. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME). Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.

  6. Oceanographic temperature and salinity measurements collected using CTD and XBT from URANIA in the Mediterranean Sea from 2001 to 2002 (NODC Accession 0043698)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Temperature, tritium and other measurements found in datasets XBT and CTD taken from the URANIA (Call sign IQSU) in the Mediteranean from 2001 to 2002 (NODC...

  7. The Unequal Burden of Weight Gain: An Intersectional Approach to Understanding Social Disparities in BMI Trajectories from 1986 to 2001/2002

    Science.gov (United States)

    Ailshire, Jennifer A.; House, James S.

    2011-01-01

    The implications of recent weight gain trends for widening social disparities in body weight in the United States are unclear. Using an intersectional approach to studying inequality, and the longitudinal and nationally representative American's Changing Lives study (1986-2001/2002), we examine social disparities in body mass index trajectories…

  8. Health Physics Enrollments and Degrees Survey, 2002 Data

    International Nuclear Information System (INIS)

    Oak Ridge Institute for Science and Education

    2003-01-01

    The survey includes degrees granted between July 1, 2001 and June 30, 2002. Enrollment information refers to the fall term 2002. Thirty-six academic programs at 35 different institutions were in the survey universe and all responded (100% response rate). Several of these programs did not have any degrees awarded during the time period. Five programs included in the 2001 survey were either discontinued or out-of-scope and not included in 2002 survey

  9. 77 FR 15096 - Bonneville Power Administration; Notice of Compliance Filing

    Science.gov (United States)

    2012-03-14

    ... Commission's Order.\\1\\ \\1\\ Iberdrola Renewables, Inc. v. Bonneville Power Admin., 137 FERC ] 61,185 (2011... the Web site that enables subscribers to receive email notification when a document is added to a...

  10. Environmental effects of the Big Rapids dam remnant removal, Big Rapids, Michigan, 2000-02

    Science.gov (United States)

    Healy, Denis F.; Rheaume, Stephen J.; Simpson, J. Alan

    2003-01-01

    The U.S. Geological Survey (USGS), in cooperation with the city of Big Rapids, investigated the environmental effects of removal of a dam-foundation remnant and downstream cofferdam from the Muskegon River in Big Rapids, Mich. The USGS applied a multidiscipline approach, which determined the water quality, sediment character, and stream habitat before and after dam removal. Continuous water-quality data and discrete water-quality samples were collected, the movement of suspended and bed sediment were measured, changes in stream habitat were assessed, and streambed elevations were surveyed. Analyses of water upstream and downstream from the dam showed that the dam-foundation remnant did not affect water quality. Dissolved-oxygen concentrations downstream from the dam remnant were depressed for a short period (days) during the beginning of the dam removal, in part because of that removal effort. Sediment transport from July 2000 through March 2002 was 13,800 cubic yards more at the downstream site than the upstream site. This increase in sediment represents the remobilized sediment upstream from the dam, bank erosion when the impoundment was lowered, and contributions from small tributaries between the sites. Five habitat reaches were monitored before and after dam-remnant removal. The reaches consisted of a reference reach (A), upstream from the effects of the impoundment; the impoundment (B); and three sites below the impoundment where habitat changes were expected (C, D, and E, in downstream order). Stream-habitat assessment reaches varied in their responses to the dam-remnant removal. Reference reach A was not affected. In impoundment reach B, Great Lakes and Environmental Assessment Section (GLEAS) Procedure 51 ratings went from fair to excellent. For the three downstream reaches, reach C underwent slight habitat degradation, but ratings remained good; reach D underwent slight habitat degradation with ratings changing from excellent to good; and, in an area

  11. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  12. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study; FINAL

    International Nuclear Information System (INIS)

    Cook, Chris B; Richmond, Marshall C; Guensch, Greg

    2001-01-01

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating

  13. Lower Granite Dam Smolt Monitoring Program, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mensik, Fred; Rapp, Shawn; Ross, Doug (Washington Department of Fish and Wildlife, Olympia, WA)

    2007-01-01

    The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam, 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers

  14. Lower Granite Dam Smolt Monitoring Program, Annual Report 2005-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Menski, Fred

    2007-01-01

    The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam, 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers

  15. Expansion at Olympic Dam

    International Nuclear Information System (INIS)

    Lewis, C.

    1997-01-01

    The Olympic Dam orebody is the 6th largest copper and the single largest uranium orebody in the world. Mine production commenced in June 1988, at an annual production rate of around 45,000 tonnes of copper and 1,000 tonnes of uranium. Western Mining Corporation announced in 1996 a proposed $1.25 billion expansion of the Olympic Dam operation to raise the annual production capacity of the mine to 200,000 tonnes of copper, approximately 3,700 tonnes of uranium, 75,000 ounces of gold and 950,000 ounces of silver by 2001. Further optimisation work has identified a faster track expansion route, with an increase in the capital cost to $1.487 billion but improved investment outcome, a new target completion date of end 1999, and a new uranium output of 4,600 tonnes per annum from that date

  16. Dam! Dam! Dam!

    International Nuclear Information System (INIS)

    McCully, P.

    1997-01-01

    The author of ''Silenced Rivers'' a book questioning the desirability of dam building and hydroelectric power generation argues the main themes of his book in this paper. Despite being hailed by politicians as good solutions to power generation problems, and enthusiastically pursued in China, the U.S.A., the former Soviet Union, India and Japan, dams have far-reaching ecological and human consequences. The ecosystems lost to flooding, and the agricultural land use lost, the human cost in terms of homes and employment lost to reservoirs, disease from water-borne infections such as malaria, and the hazards of dams overflowing or breaking are all factors which are against the case for dam construction. The author argues the hydroelectric power may be renewable, but the social, agricultural and ecological costs are too high to justify it as a method of first choice. (UK)

  17. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.; McKinstry, C.; Cook, C. [Pacific Northwest National Laboratory

    2005-02-01

    This report documents a four-year study(a) to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss) at the entrance to the forebay of the third powerplant at Grand Coulee Dam. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). In this report, emphasis is placed on the methodology and results associated with the fourth project year and compared with findings from the previous years to provide an overall project summary. Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power and Conservation Council Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph dams on the Columbia River (Figure S.1). A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish, including kokanee and rainbow trout, were entrained annually at Grand Coulee Dam. Analysis of the data found that 85% of the total entrainment occurred at the dam's third powerplant. Because these entrainment rates represent a significant loss to the tribal fisheries upstream of the dam, they have been judged unacceptable to fishery managers responsible for perpetuating the fishery in Lake Roosevelt. In an effort to reduce fish entrainment rates, the scope of work for the Chief Joseph Kokanee Enhancement Project was modified in 2001 to include a multiyear study of the efficacy of using strobe lights to deter fish from entering the third powerplant forebay. Pacific Northwest National Laboratory initiated the four-year study in collaboration with Colville

  18. Diferenças clínicas observadas em pacientes com dengue causadas por diferentes sorotipos na epidemia de 2001/2002, ocorrida no município do Rio de Janeiro Clinical differences observed in patients with dengue caused by different serotypes in the epidemic of 2001/2002, occurred in Rio de Janeiro

    Directory of Open Access Journals (Sweden)

    Maíla Naves Pereira Passos

    2004-08-01

    Full Text Available O objetivo deste estudo foi avaliar as diferenças clínicas e epidemiológicas das infecções causadas pelos distintos sorotipos do vírus do dengue na epidemia 2001-2002 no município do Rio de Janeiro. Foram analisados 362 casos com isolamento viral, sendo 62 do sorotipo 1,62 do sorotipo 2, e 238 do sorotipo 3. Estes casos foram notificados ao Sistema de Informação de Agravos de Notificação (SINAN de janeiro/2001 até junho/2002. Os indivíduos infectados com o sorotipo 3 tiveram uma chance 6,07 vezes maior de apresentar choque em relação aos indivíduos com o sorotipo 2 (OR=6,07; IC:1,10-43,97. A chance de apresentar dor abdominal foi 3,06 maior nos infectados pelo sorotipo 3 do que naqueles por sorotipo 1 (OR=3,06; IC:0,99-9,66. Nos infectados com o sorotipo 3, a chance de ocorrer exantema foi 3,61 vezes maior que naqueles com o sorotipo 1 (OR=3,61; IC:1,16-11,51 e 3,55 vezes maior que aqueles com o sorotipo 2 (OR=3,55; IC:1,28-9,97. Este estudo mostra que indivíduos acometidos pelo sorotipo 3 apresentaram dengue com maior gravidade.The authors evaluated clinical and epidemiological differences among the serotypes of dengue in Rio de Janeiro's 2001-2002 outbreak of the disease. Out of 362 cases that had viral isolation samples, notified by the Information System for Notification Diseases (SINAN, from January/2001 to June/2002, 62 were caused by serotype 1,62 by serotype 2 and 238 by serotype 3. In comparison with serotype 2, an individual infected by serotype 3 had a 6.07 times higher chance (OR = 6.07; CI: 1.10-43.97 of presenting shock and a 3.55 times higher chance (OR = 3.55; CI: 1.28-9.97 of developing exanthema. When compared to serotype 1, serotype 3 had a 3.06 times higher chance (OR = 3.06; CI: 0.99-9.66 of causing abdominal pain and a 3.61 times higher chance of exanthema (OR = 3.61; CI: 1.16-11.51. It was found that individuals infected by serotype 3 of the virus presented signs indicating a more severe disease.

  19. Survival estimates for the passage of juvenile salmonids through Snake River dams and reservoirs, 1996. Annual report

    International Nuclear Information System (INIS)

    Smith, S.G.; Muir, W.D.; Hockersmith, E.E.; Achord, S.; Eppard, M.B.; Ruehle, T.E.; Williams, J.G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature

  20. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature.

  1. Faecal carriage of extended-spectrum β-lactamase-producing Enterobacteriaceae among humans in Java, Indonesia, in 2001-2002.

    Science.gov (United States)

    Severin, Juliëtte A; Lestari, Endang Sri; Kloezen, Wendy; Lemmens-den Toom, Nicole; Mertaniasih, Ni Made; Kuntaman, Kuntaman; Purwanta, Marijam; Duerink, D Offra; Hadi, Usman; van Belkum, Alex; Verbrugh, Henri A; Goessens, Wil H

    2012-04-01

    To characterise commensal Escherichia coli and other Enterobacteriaceae with reduced susceptibility to cefotaxime that were collected in a large survey carried out among 3995 patients and healthy persons in two urban regions on Java, Indonesia, in 2001-2002. The putative extended-spectrum β-lactamase (ESBL)-producing Enterobacteriaceae were analysed using double-disk synergy tests, isoelectric focusing, PCR assays, DNA sequencing, and pulsed-field gel electrophoresis (PFGE). On the day of discharge after five or more days of hospitalisation, at least 95 of 999 (9.5%) patients carried ESBL-positive Enterobacteriaceae as dominant faecal flora. Six patients were simultaneously colonised with E. coli and Klebsiella pneumoniae isolates with ESBL activity. On admission, only 6 of 998 (0.6%) patients were colonised. Faecal carriage of ESBL-producing Enterobacteriaceae among healthy persons or persons visiting a public health centre was not detected. The 107 ESBL-positive strains included 68 E. coli, 35 K. pneumoniae, and four other Enterobacteriaceae. bla(CTX-M-15) was the most prevalent ESBL in both E. coli (47.1%) and K. pneumoniae (45.7%), but the E. coli O25b-ST131 clone was virtually absent. Other ESBL types found were: SHV-2, -2a, -5, -12, CTX-M-3, -9, -14, and TEM-19. PFGE revealed extensive genetic diversity among the isolates. In 2001-2002, faecal carriage of ESBL-producing Enterobacteriaceae as dominant flora in Indonesia was almost exclusively hospital-associated. The presence of various bla(ESBL) genes and the extensive genetic diversity among isolates argue against a single/dominant strain outbreak. © 2012 Blackwell Publishing Ltd.

  2. Recent changes in Imja Glacial Lake and its damming moraine in the Nepal Himalaya revealed by in situ surveys and multi-temporal ASTER imagery

    International Nuclear Information System (INIS)

    Fujita, Koji; Sakai, Akiko; Nuimura, Takayuki; Yamaguchi, Satoru; Sharma, Rishi R

    2009-01-01

    Changes in the area and bathymetry of Imja Glacial Lake and in the elevation of its damming moraine, Khumbu region, Nepal Himalaya are investigated. Previously reported changes in the lake area have been updated by multi-temporal ASTER images, which revealed a decreased expansion rate after 2000. A provisional expansion of the lake observed in 2004, from which some studies concluded an accelerated lake expansion due to global warming, has, from 2005, subsided to the glacier surface. Bathymetric changes for the period 1992-2002 that were first obtained for Himalayan glacial lakes suggest that the melting of debris-covered ice beneath the lake is insignificant in terms of the increase in lake volume, and that the retreat of a glacier in contact with the lake by calving is essential for the lake's expansion. Changes in the height of a damming moraine for the period 2001-2007 suggest a continuous surface lowering near the lake, though the lowering rates are smaller than those for the period 1989-1994.

  3. Pacific Lamprey Research and Restoration : Annual Report 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Aaron D.; Hatch, Douglas R.; Close, David A.

    1998-08-05

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations as well. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of the Umatilla Indian Reservation, the Columbia River Inter-Tribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam.

  4. Geotechnical Analysis Report for July 2001 - June 2002

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports on a quarterly basis to document the geomechanical performance during and immediately after excavation of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2001, to June 30, 2002. It is divided into ten chapters. The remainder of Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation located in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5, 6, and 7 present the results of geomechanical monitoring in the three main portions of the WIPP underground facility (the access drifts, the Northern Experimental Area, and the Waste Disposal Area). Chapter 8 discusses the results of the Geoscience Program, which include fracture and stratigraphic mapping, borehole and core logging, and borehole observations. Chapter 9 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 10 lists the References and Bibliography

  5. Geotechnical Analysis Report for July 2001 - June 2002

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2002-09-20

    This Geotechnical Analysis Report (GAR) presents and interprets the geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports on a quarterly basis to document the geomechanical performance during and immediately after excavation of the underground facility. Since the completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2001, to June 30, 2002. It is divided into ten chapters. The remainder of Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation located in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5, 6, and 7 present the results of geomechanical monitoring in the three main portions of the WIPP underground facility (the access drifts, the Northern Experimental Area, and the Waste Disposal Area). Chapter 8 discusses the results of the Geoscience Program, which include fracture and stratigraphic mapping, borehole and core logging, and borehole observations. Chapter 9 summarizes the results of the geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 10 lists the References and Bibliography.

  6. State transitions in the 2001/2002 outburst of XTE J1650-500

    International Nuclear Information System (INIS)

    Rossi, S.; Homan, J.; Miller, J.M.; Belloni, T.

    2004-01-01

    We present a study of the X-ray transient and black hole candidate XTE J1650-500 during its 2001/2002 outburst. The source made two state transitions between the hard and soft states, at luminosity levels that differ by a factor of ∼5-10. The first transition, between hard and soft, lasted for ∼30 days and showed two parts; one part in which the spectral properties evolve smoothly away from the hard state and another that we identify as the 'steep power law state'. The two parts showed different behavior of the Fe K emission line and QPO frequencies. The second transition, from soft to hard, lasted only ∼15 days and showed no evidence of the presence of the 'steep power law state'. Comparing observations from the early rise and the decay of the outburst, we conclude that the source can be in the hard state in a range of more than 10 4 in luminosity. We briefly discuss the state transitions in the framework of a two-flow model

  7. Walden North Dam overtopping : emergency response and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, S. [FortisBC Inc., South Slocan, BC (Canada); McCreanor, J. [Acres International Ltd., Calgary, AB (Canada); Cronin, D.L.R.; Daw, D. [Acres International Ltd., Vancouver, BC (Canada)

    2004-09-01

    This paper described the events that led to the overtopping of the Walden North Dam during a heavy rainfall in June 2002, resulting in a breach around an abutment wall. The dam is part of a run-of-river hydro development on Cayoosh Creek near Lillooet, British Columbia. The Walden North Dam was a low, 46 meter wide concrete dam with a single radial gate. The dam overtopping was attributed to failure of the radial gate hoist. Prior to this event, the dam had been classified by the British Columbia Dam Safety Authorities as a high and then a low consequence category of failure. As facility managers, Aquila Networks Canada Ltd. established an immediate action plan to stabilize the situation and resume normal power production by applying the following priorities: (1) ensure safety of workers and the public, (2) limit further damage to the dam and other facilities, (3) ensure environmental protection, and (4) continue to operate the generation units. Local authorities were informed to evacuate a downstream campsite and environmental agencies were contacted along with safety regulators. Repairs included demolition of the damaged portion of the structure and construction a new two-bay gate/stoplog spillway and bridge. Construction was completed by September 2003 according to the requirements of the Department of Fisheries and Oceans for minimum flow, accurate control of fish flows and environmental monitoring of the stream area. 10 figs.

  8. Umatilla River Fish Passage Operations Program, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2004-03-01

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 17, 2002 to September 29, 2003. A total of 3,080 summer steelhead (Oncorhynchus mykiss); 1716 adult, 617 jack, and 1,709 subjack fall chinook (O. tshawytscha); 3,820 adult and 971 jack coho (O. kisutch); and 3,607 adult and 135 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 6 summer steelhead and 330 adult and 49 jack spring chinook were hauled upstream from Threemile Dam. There were 2,882 summer steelhead; 1161 adult, 509 jack and 1,546 subjack fall chinook; 3,704 adult and 915 jack coho; and 2,406 adult and 31 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 109 summer steelhead; 532 adult and 32 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. In addition, 282 spring chinook were collected for the outplanting efforts in the Walla Walla Basin. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 159 days between January 27 and July 4, 2003. During that period, fish were bypassed back to the river 145 days and were trapped 11 days. An estimated 205 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 82% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened on September 16, 2002. and continued until November 1, 2002. The bypass was reopened March 3, 2003 and ran until July 3, 2003. The juvenile trap was operated by the Umatilla Passage Evaluation

  9. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites

  10. Evaluate Potenial Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Everett, Scott R.; Tuell, Michael A.; Hesse, Jay A. (Nez Perce Tribe, Department of Fisheries Management, Lapwai, ID)

    2004-02-01

    The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This report presents a summary of results from the 1997-2002 Phase II data collection and represents the end of phase II. From 1997 to 2001 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon. A total of 1,785 white sturgeon were captured and tagged in the Snake River and 77 in the Salmon River. Since 1997, 25.8 percent of the tagged white sturgeon have been recaptured. Relative density of white sturgeon was highest in the free-flowing segment of the Snake River, with reduced densities of fish in Lower Granite Reservoir, and low densities the Salmon River. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir, the free-flowing Snake River and the Salmon River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 30 percent since the 1970's. Using the Jolly-Seber model, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,483 fish, with a 95% confidence interval of 1,208-7,477. Total annual mortality rate was estimated to be 0.14 (95% confidence interval of 0.12 to 0.17). A total of 35 white sturgeon were fitted with radio-tags during 1999-2002. The movement of these fish ranged from 53 km (33 miles) downstream to 77 km (48 miles) upstream; however, 38.8 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No

  11. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam, 1999-2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    2001-04-01

    We report on our progress from April 1999 through March 2000 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), and the U.S. Fish and Wildlife Service (USFWS; Report E). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1999 through March 2000 are given.

  12. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 1998-1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.

    2000-12-01

    The authors report on their progress from April 1998 through March 1999 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), U.S. Fish and Wildlife Service (USFWS; Report D), Columbia River Inter-Tribal Fish Commission (CRITFC; Report E), and the University of Idaho (UI; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1998 through March 1999 are given.

  13. The world energy consumption in 2001. Statistical yearbook ENERDATA 2002

    International Nuclear Information System (INIS)

    2002-01-01

    Statistical data on the world energy consumption are given to illustrate the following situation in 2001: the deceleration of the world economic growth and the high prices of oil slowed down the progression of the energy consumption: 0,7 % in 2001; stagnation of the gas and oil consumption and strong progression for coal and electricity in 2001; the deceleration for gas marks a strong inflection compared to the past trends. (A.L.B.)

  14. Chandra Snapshot Spectral Imaging of Comets C/2001 Q4 (NEAT) and C/2002 T7 (LINEAR)

    Science.gov (United States)

    Lisse, Carey

    2003-09-01

    The highly favorable perigee passage of the very bright comets C/2001 Q4 (NEAT) and C/2002 T7 (LINEAR) in late May 2004 provides an opportunity to study cometary x-ray emission in conjunction with the new CHIPS spectroscopic mission. In 10 ksec of on-target time for each comet, ACIS-S will obtain snapshot images of the comets in the heart of the CHIPS 0.05 0.150 keV spectroscopic monitoring period in late-May 2004. The combined observations have the potential of directly detecting for the first time the ultra-soft emission due to Mg, S, Si, and Fe predicted by McCammon et al. (2002) from soft x-ray background measurements and by Kharchenko et al. (2000, 2003) from models of solar wind minor ion charge exchange emission. New work by Wegmann, Dennerl, and Lisse (2004) allows a determination of the neutral gas production rate from the spatial scale of the emission, and an independent determination of the solar wind minor ion flux density using the x-ray surface brightness.

  15. International nuclear power status 2002; International kernekraftstatus 2002

    Energy Technology Data Exchange (ETDEWEB)

    Lauritzen, B.; Majborn, B.; Nonboel, E.; Oelgaard, P.L. (eds.)

    2003-03-01

    This report is the ninth in a series of annual reports on the international development of nuclear power with special emphasis on reactor safety. For 2002, the report contains: 1) General trends in the development of nuclear power; 2) Decommissioning of the nuclear facilities at Risoe National Laboratory: 3) Statistical information on nuclear power production (in 2001); 4) An overview of safety-relevant incidents in 2002; 5) The development in West Europe; 6) The development in East Europe; 7) The development in the rest of the world; 8) Development of reactor types; 9) The nuclear fuel cycle; 10) International nuclear organisations. (au)

  16. Reference document 2001. A (AREVA) for..; Document de reference 2001. A (AREVA) comme..

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This reference document 2001, on the group Areva, provides data and information on the Areva emerges, overview of operations, sustainable development policy, research and development programs, nuclear power activities (front-end, reactors and services back-end divisions), components (connectors division and STMicroelectronics, human resources, share data and financial information (financial report 2001, financial report first-half 2002). (A.L.B.)

  17. Activities of the summer operations of the 43rd Japanese Antarctic Research Expedition (JARE-43 in 2001-2002

    Directory of Open Access Journals (Sweden)

    Fumihiko Nishio

    2013-03-01

    Full Text Available The activities in the 2001-2002 austral summer of the 43rd Japanese Antarctic Research Expedition (JARE-43 are reported. JARE-43 consisted of 60 personnel including 20 summer and 40 wintering personnel. In addition, 7 observers joined the voyage of R/V Shirase. She left Harumi on Nov. 14 in 2001, and the 56 personel and 7 observers went on boad in Freemantle of Western Australia for Syowa Station, other 4 personel for another ship as mentioned below. R/V Shirase left the ground on Dec. 3 and arrived at the ice edge on Dec. 14, after carrying out marine observations on the cruise. She anchored at Syowa Station on Dec. 23, after the first flight on Dec. 18. All the cargo and fuel necessary for the wintering program of JARE-43 were unloaded and the missions for the summer party were forced to finish by the last flight on Feb. 12 in 2002. The helicopter, chartered by JARE-43, moved to Syowa Station from R/V Shirase on Dec. 23 and supported the observation programs until Feb. 3, including the inland areas of ice sheets. The observation on the Mizuho Ice Plateau for the seismic exploration programs was especially supported by air during the traverse. Constructions with engineering works and facilities update were conducted in the several areas in Syowa Station, and most of them were accomplished, some, however, left for the wintering party. In addition, 4 summer members carried out other marine observations using R/V Tangaroa chartered by JARE-43.

  18. Saying Goodbye to 'Bonneville' Crater

    Science.gov (United States)

    2004-01-01

    [figure removed for brevity, see original site] Annotated Image NASA's Mars Exploration Rover Spirit took this panoramic camera image on sol 86 (March 31, 2004) before driving 36 meters (118 feet) on sol 87 toward its future destination, the Columbia Hills. This is probably the last panoramic camera image that Spirit will take from the high rim of 'Bonneville' crater, and provides an excellent view of the ejecta-covered path the rover has journeyed thus far. The lander can be seen toward the upper right of the frame and is approximately 321 meters (1060 feet) away from Spirit's current location. The large hill on the horizon is Grissom Hill. The Colombia Hills, located to the left, are not visible in this image.

  19. River system recovery following the Novat-Rosu tailings dam failure, Maramures County, Romania

    International Nuclear Information System (INIS)

    Bird, Graham; Brewer, Paul A.; Macklin, Mark G.; Balteanu, Dan; Serban, Mihaela; Driga, Basarab; Zaharia, Sorin

    2008-01-01

    The River Viseu catchment in Maramures County, northwestern Romania, has a long history of base and precious metal mining. Between 1994 and 2003 waste from mining activity at Baia Borsa was stored in the Novat-Rosu tailings pond in the upper Viseu catchment. However, in March 2000, the tailings dam failed releasing approximately 100,000 m 3 of contaminated water and 20,000 t of mineral-rich solid waste, which was routed downstream through the Rivers Novat, Vaser and Viseu into the River Tisa. Following the accident metal (Cd, Cu, Pb, Zn) concentrations in river water and river channel sediment were assessed in samples collected annually (July 2000, 2001, 2002 and 2003) from 29 sites in the Viseu catchment, downstream of the tailings pond. Additionally, the speciation of sediment-associated metals was established using a 4-stage sequential extraction procedure (SEP) and Pb isotope analysis ( 206/204 Pb and 207/204 Pb) was carried out to establish the provenance of contaminated sediments. Metal concentrations in river water were found to comply with EU directive 'target' values within four months of the failure. However, the impact of the spill upon river channel sediments was found to be much longer-lasting, with evidence of the delayed downstream remobilization of tailings stored within the narrow Novat valley following the dam failure, as well as continued inputs of contaminated sediment to the River Viseu from the River Tisla, another mining-affected tributary. Comparison with data from other recent tailings dam failures, indicates that river system recovery rates depend upon local geomorphological conditions, hydrological regimes, and the nature and scale of post-spill clean-up operations

  20. Electrical Energy Statistics for France 2002; Statistiques de l'energie electrique en France - 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-11-01

    Detailed statistics on electricity flows in France and on facilities. Regional data / Consumption per sector of activity / Records over last 10 years (definitive results). In 2002, national electrical consumption reached 449.9 TWh, an increase of 0.3% compared with 2001 (448.6 TWh). Adjusted for winter and summer climate contingencies, its growth rate was 0.9% compared with 2001. Consumption by customers connected at high or medium voltage levels came to 254.2 TWh, an increase of 0.8% compared with 2001 (252.3 TWh); consumption by customers connected at low voltage levels came to 165 TWh, a decrease of 0.8% compared with 2001 (166.4 TWh). Generation in France reached 534.3 TWh, an increase of 11.5 TWh or 2.2% compared with 2001 (522.8 TWh). This increase broke down between nuclear generation and conventional thermal generation. Net nuclear generation injected, as measured by RTE, came to 415.5 TWh in 2002, an increase of 4.0% compared with 2001 (399.6 TWh). Conventional thermal generation came to 51.1 TWh, an increase of 15.4 % compared with 2001 (44.3 TWh). Hydro-electric generation amounted to 65.5 TWh, a fall of 15.3% compared with 2001 (77.3 TWh). In terms of physical exchanges with foreign countries, France exported a net total of 77 TWh, an increase of 12.6% compared with 2001 (68.4 TWh). Contractual exchanges with foreign countries, recorded by RTE, fell by 9.9 % to reach a cumulative value for exports and imports of 107.8 TWh (compared with 120 TWh in 2001)

  1. Overview of suspected adverse reactions to veterinary medicinal products reported in South Africa (March 2001 - February 2002 : report

    Directory of Open Access Journals (Sweden)

    V. Naidoo

    2002-07-01

    Full Text Available An overview of reports of suspected adverse drug reactions received by the Veterinary Pharmacovigilance and Medicines Information Centre during the period March 2001 to February 2002 is given. A total of 77 reports were received. The majority of reports involved suspected adverse reactions that occurred in dogs and cats. Most products implicated in the reports were Stock Remedies. The products were predominantly administered either by veterinarians or trained paraveterinary professionals. Although the majority of reports were received from veterinary pharmaceutical companies, the proportion of reports received directly from veterinarians increased compared with previous years.

  2. Trends in Food Habits and Their Relation to Socioeconomic Status among Nordic Adolescents 2001/2002-2009/2010.

    Directory of Open Access Journals (Sweden)

    Anne-Siri Fismen

    Full Text Available In the Nordic countries, substantial policy and intervention efforts have been made to increase adolescents' consumption of fruit and vegetables and to reduce their intake of sweets and soft drinks. Some initiatives have been formulated in a Nordic collaboration and implemented at national level. In recent years, social inequalities in food habits have been attracted particular governmental interest and several initiatives addressing the socioeconomic gradient in food habits have been highlighted. However, few internationally published studies have evaluated how trends in adolescents' food habits develop in the context of Nordic nutrition policy, or have compared differences between the Nordic countries.The study was based on Danish, Finnish, Norwegian and Swedish cross-sectional data from the international Health Behaviour in School-Aged Children (HBSC study, collected via three nationally representative and comparable questionnaire surveys in 2001/2002, 2005/2006 and 2009/2010. Food habits were identified by students' consumption of fruit, vegetables, sweets and sugar sweetened soft drink. Socioeconomic status (SES was measured with the Family Affluence Scale (FAS. Multilevel logistic regression was used to analyze the data.Trends in fruit consumption developed differently across countries, characterized by an increase in Denmark and Norway and more stable trends in Sweden and Finland. Vegetable consumption increased particularly in Denmark and to a lesser extent in Norway, whereas Sweden and Finland displayed stable trends. Decreased trends were observed for sweet and soft drink consumption and were similar in Norway, Sweden and Finland. Sweet consumption decreased across all survey years, whereas soft drink consumption decreased between 2001/2002-2005/2006 and was stable thereafter. Denmark displayed an increase between 2001/2002-2005/2006 followed by a similar decrease between 2005/2006-2009/2010 for both sweet and soft drink consumption

  3. Trends in Food Habits and Their Relation to Socioeconomic Status among Nordic Adolescents 2001/2002-2009/2010.

    Science.gov (United States)

    Fismen, Anne-Siri; Smith, Otto Robert Frans; Torsheim, Torbjørn; Rasmussen, Mette; Pedersen Pagh, Trine; Augustine, Lilly; Ojala, Kristiina; Samdal, Oddrun

    2016-01-01

    In the Nordic countries, substantial policy and intervention efforts have been made to increase adolescents' consumption of fruit and vegetables and to reduce their intake of sweets and soft drinks. Some initiatives have been formulated in a Nordic collaboration and implemented at national level. In recent years, social inequalities in food habits have been attracted particular governmental interest and several initiatives addressing the socioeconomic gradient in food habits have been highlighted. However, few internationally published studies have evaluated how trends in adolescents' food habits develop in the context of Nordic nutrition policy, or have compared differences between the Nordic countries. The study was based on Danish, Finnish, Norwegian and Swedish cross-sectional data from the international Health Behaviour in School-Aged Children (HBSC) study, collected via three nationally representative and comparable questionnaire surveys in 2001/2002, 2005/2006 and 2009/2010. Food habits were identified by students' consumption of fruit, vegetables, sweets and sugar sweetened soft drink. Socioeconomic status (SES) was measured with the Family Affluence Scale (FAS). Multilevel logistic regression was used to analyze the data. Trends in fruit consumption developed differently across countries, characterized by an increase in Denmark and Norway and more stable trends in Sweden and Finland. Vegetable consumption increased particularly in Denmark and to a lesser extent in Norway, whereas Sweden and Finland displayed stable trends. Decreased trends were observed for sweet and soft drink consumption and were similar in Norway, Sweden and Finland. Sweet consumption decreased across all survey years, whereas soft drink consumption decreased between 2001/2002-2005/2006 and was stable thereafter. Denmark displayed an increase between 2001/2002-2005/2006 followed by a similar decrease between 2005/2006-2009/2010 for both sweet and soft drink consumption. Socioeconomic

  4. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  5. Recent changes in Imja Glacial Lake and its damming moraine in the Nepal Himalaya revealed by in situ surveys and multi-temporal ASTER imagery

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, Koji; Sakai, Akiko; Nuimura, Takayuki [Graduate School of Environmental Studies, Nagoya University, Nagoya 464-8601 (Japan); Yamaguchi, Satoru [Snow and Ice Research Center, National Research Institute for Earth Science and Disaster Prevention, Nagaoka 940-0821 (Japan); Sharma, Rishi R [Department of Hydrology and Meteorology, Ministry of Environment, Science and Technology, Babar Mahal, Kathmandu (Nepal)

    2009-10-15

    Changes in the area and bathymetry of Imja Glacial Lake and in the elevation of its damming moraine, Khumbu region, Nepal Himalaya are investigated. Previously reported changes in the lake area have been updated by multi-temporal ASTER images, which revealed a decreased expansion rate after 2000. A provisional expansion of the lake observed in 2004, from which some studies concluded an accelerated lake expansion due to global warming, has, from 2005, subsided to the glacier surface. Bathymetric changes for the period 1992-2002 that were first obtained for Himalayan glacial lakes suggest that the melting of debris-covered ice beneath the lake is insignificant in terms of the increase in lake volume, and that the retreat of a glacier in contact with the lake by calving is essential for the lake's expansion. Changes in the height of a damming moraine for the period 2001-2007 suggest a continuous surface lowering near the lake, though the lowering rates are smaller than those for the period 1989-1994.

  6. Areva in 2002

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    In 2002 the consolidated turnover of Areva reached 8265 million euros, it means a decrease by 7,2% in comparison with 2001. This decrease is due to the sharp drop of the turnover of the connector sector (-20,7%) while the nuclear sector was stable. The bad figure of connectors engineering is linked to a new collapse of the telecommunication market. In 2002 the operational result of Areva reached 180 million euros, that is to say an increase by 48%, which is a consequence of progress made in the nuclear sector. (A.C.)

  7. CSIR Technology Impact 2002

    CSIR Research Space (South Africa)

    CSIR

    2002-01-01

    Full Text Available This issue of Technology Impact offers a brief snapshot of CSIR activities during the year under review (1 March 2001 - 28 February 2002) by highlighting a number of innovative projects and initiatives in these areas....

  8. Electrical Energy Statistics for France 2002

    International Nuclear Information System (INIS)

    2003-11-01

    Detailed statistics on electricity flows in France and on facilities. Regional data / Consumption per sector of activity / Records over last 10 years (definitive results). In 2002, national electrical consumption reached 449.9 TWh, an increase of 0.3% compared with 2001 (448.6 TWh). Adjusted for winter and summer climate contingencies, its growth rate was 0.9% compared with 2001. Consumption by customers connected at high or medium voltage levels came to 254.2 TWh, an increase of 0.8% compared with 2001 (252.3 TWh); consumption by customers connected at low voltage levels came to 165 TWh, a decrease of 0.8% compared with 2001 (166.4 TWh). Generation in France reached 534.3 TWh, an increase of 11.5 TWh or 2.2% compared with 2001 (522.8 TWh). This increase broke down between nuclear generation and conventional thermal generation. Net nuclear generation injected, as measured by RTE, came to 415.5 TWh in 2002, an increase of 4.0% compared with 2001 (399.6 TWh). Conventional thermal generation came to 51.1 TWh, an increase of 15.4 % compared with 2001 (44.3 TWh). Hydro-electric generation amounted to 65.5 TWh, a fall of 15.3% compared with 2001 (77.3 TWh). In terms of physical exchanges with foreign countries, France exported a net total of 77 TWh, an increase of 12.6% compared with 2001 (68.4 TWh). Contractual exchanges with foreign countries, recorded by RTE, fell by 9.9 % to reach a cumulative value for exports and imports of 107.8 TWh (compared with 120 TWh in 2001)

  9. Development of a System-Wide Predator Control Program: Stepwise Implementation of a Predation Index, Predator Control Fisheries, and Evaluation Plan in the Columbia River Basin; Northern Pikeminnow Management Program, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Russell G.; Winther, Eric C.; Fox, Lyle G.

    2004-01-01

    This report presents results for year twelve in a basin-wide program to harvest northern pikeminnow1 (Ptychocheilus oregonensis). This program was started in an effort to reduce predation by northern pikeminnow on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern pikeminnow on juvenile salmonids might account for most of the 10-20% mortality juvenile salmonids experience in each of eight Columbia River and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated that, if predator-size northern pikeminnow were exploited at a 10-20% rate, the resulting restructuring of their population could reduce their predation on juvenile salmonids by 50%. To test this hypothesis, we implemented a sport-reward angling fishery and a commercial longline fishery in the John Day Pool in 1990. We also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, we implemented three test fisheries on a system-wide scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery. Low catch of target fish and high cost of implementation resulted in discontinuation of the tribal longline fishery. However, the sport-reward and dam-angling fisheries were continued in 1992 and 1993. In 1992, we investigated the feasibility of implementing a commercial longline fishery in the Columbia River below Bonneville Dam and found that implementation of this fishery was also infeasible. Estimates of combined annual exploitation rates resulting from the sport-reward and damangling fisheries remained at the low end of our target range of 10-20%. This suggested the need for additional effective harvest techniques. During 1991 and 1992, we developed and tested a modified

  10. 2001 - 2002 ACADEMIC TRAINING PROGRAMME

    CERN Multimedia

    Academic Training; Tel. 73127

    2001-01-01

    1ST TERM 1ST OCTOBER - 23 NOVEMBER 2001 LECTURE SERIES FOR POSTGRADUATE STUDENTS The Autumn term of the Academic Training Programme is about to start. As usual, the first term includes lectures primarily dedicated to Post-graduate students. These are meant to help students complement the courses available from their home Universities with lectures on topics close to CERN activities. The lectures are nevertheless open to all CERN staff, and in particular to young Fellows. This year's series include courses on Accelerator Physics, on Field Theory, and on Symmetry Breaking Phenomena in Physics. The course on Accelerators by Dr. Wilson has been a regular feature on the Academic Training programme for many previous editions. This year, the course will be updated to include new sections on Colliders and on future facilities such as the Neutrino Factory. A good introduction to this very successful course can be found in the previous version of these lectures, available from the Web Lecture Archive Project: http://w...

  11. Trends in Food Habits and Their Relation to Socioeconomic Status among Nordic Adolescents 2001/2002-2009/2010

    Science.gov (United States)

    Fismen, Anne-Siri; Smith, Otto Robert Frans; Torsheim, Torbjørn; Rasmussen, Mette; Pedersen Pagh, Trine; Augustine, Lilly; Ojala, Kristiina; Samdal, Oddrun

    2016-01-01

    Background In the Nordic countries, substantial policy and intervention efforts have been made to increase adolescents' consumption of fruit and vegetables and to reduce their intake of sweets and soft drinks. Some initiatives have been formulated in a Nordic collaboration and implemented at national level. In recent years, social inequalities in food habits have been attracted particular governmental interest and several initiatives addressing the socioeconomic gradient in food habits have been highlighted. However, few internationally published studies have evaluated how trends in adolescents' food habits develop in the context of Nordic nutrition policy, or have compared differences between the Nordic countries. Methods The study was based on Danish, Finnish, Norwegian and Swedish cross-sectional data from the international Health Behaviour in School-Aged Children (HBSC) study, collected via three nationally representative and comparable questionnaire surveys in 2001/2002, 2005/2006 and 2009/2010. Food habits were identified by students' consumption of fruit, vegetables, sweets and sugar sweetened soft drink. Socioeconomic status (SES) was measured with the Family Affluence Scale (FAS). Multilevel logistic regression was used to analyze the data. Results Trends in fruit consumption developed differently across countries, characterized by an increase in Denmark and Norway and more stable trends in Sweden and Finland. Vegetable consumption increased particularly in Denmark and to a lesser extent in Norway, whereas Sweden and Finland displayed stable trends. Decreased trends were observed for sweet and soft drink consumption and were similar in Norway, Sweden and Finland. Sweet consumption decreased across all survey years, whereas soft drink consumption decreased between 2001/2002–2005/2006 and was stable thereafter. Denmark displayed an increase between 2001/2002–2005/2006 followed by a similar decrease between 2005/2006–2009/2010 for both sweet and soft

  12. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  13. Seismic hazard and risk assessment for large Romanian dams situated in the Moldavian Platform

    Science.gov (United States)

    Moldovan, Iren-Adelina; Popescu, Emilia; Otilia Placinta, Anica; Petruta Constantin, Angela; Toma Danila, Dragos; Borleanu, Felix; Emilian Toader, Victorin; Moldoveanu, Traian

    2016-04-01

    Besides periodical technical inspections, the monitoring and the surveillance of dams' related structures and infrastructures, there are some more seismic specific requirements towards dams' safety. The most important one is the seismic risk assessment that can be accomplished by rating the dams into seismic risk classes using the theory of Bureau and Ballentine (2002), and Bureau (2003), taking into account the maximum expected peak ground motions at the dams site - values obtained using probabilistic hazard assessment approaches (Moldovan et al., 2008), the structures vulnerability and the downstream risk characteristics (human, economical, historic and cultural heritage, etc) in the areas that might be flooded in the case of a dam failure. Probabilistic seismic hazard (PSH), vulnerability and risk studies for dams situated in the Moldavian Platform, starting from Izvorul Muntelui Dam, down on Bistrita and following on Siret River and theirs affluent will be realized. The most vulnerable dams will be studied in detail and flooding maps will be drawn to find the most exposed downstream localities both for risk assessment studies and warnings. GIS maps that clearly indicate areas that are potentially flooded are enough for these studies, thus giving information on the number of inhabitants and goods that may be destroyed. Geospatial servers included topography is sufficient to achieve them, all other further studies are not necessary for downstream risk assessment. The results will consist of local and regional seismic information, dams specific characteristics and locations, seismic hazard maps and risk classes, for all dams sites (for more than 30 dams), inundation maps (for the most vulnerable dams from the region) and possible affected localities. The studies realized in this paper have as final goal to provide the local emergency services with warnings of a potential dam failure and ensuing flood as a result of an large earthquake occurrence, allowing further

  14. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  15. Effects of the Operation of Kerr and Hungry Horse Dams on the Kokanee Fishery in the Flathead River System, 1979-1985 Final Research Report.

    Energy Technology Data Exchange (ETDEWEB)

    Clancy, Patrick

    1986-05-01

    This study was undertaken to assess the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. Studies concerning operation of the dam on the Flathead River aquatic biota began in 1979 and continued to 1982 under Bureau of Reclamation funding. These studies resulted in flow recommendations for the aquatic biota in the main stem Flathead River, below the influence of Hungry Horse Dam on the South Fork. Studies concerned specifically with kokanee salmon have continued under Bonneville Power Administration funding since 1982. This completion report covers the entire study period (September 1979 to June 1985). Major results of this study were: (1) development and refinement of methods to assess hydropower impacts on spawning and incubation success of kokanee; (2) development of a model to predict kokanee year class strength from Flathead River flows; and (3) implementation of flows favorable for successful kokanee reproduction. A monitoring program has been developed which will assess the recovery of the kokanee population as it proceeds, and to recommend management strategies to maintain management goals for the kokanee fishery in the river system.

  16. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Mallette, Christine [Oregon Department of Fish and Wildlife

    2009-07-28

    We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  17. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; McMichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, X.; Fu, Tao

    2014-03-28

    bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.

  18. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison H.A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jones, Bryan W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanson, Amanda C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Trott, Donna M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mcmichael, Geoffrey A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Brown, Richard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xinya [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-15

    bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.

  19. Reference document 2001. A (AREVA) for.

    International Nuclear Information System (INIS)

    2002-01-01

    This reference document 2001, on the group Areva, provides data and information on the Areva emerges, overview of operations, sustainable development policy, research and development programs, nuclear power activities (front-end, reactors and services back-end divisions), components (connectors division and STMicroelectronics, human resources, share data and financial information (financial report 2001, financial report first-half 2002). (A.L.B.)

  20. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  1. U.S. Naval Observatory Annual Report 2001-2002

    Science.gov (United States)

    2002-06-01

    two prototype arrays and the first science grade attempt have been made. The early de- vices look cosmetically very good, with no evidence of cracking...Klepczynski, W., Fenton , P., and Powers, E. ~2002!. ‘‘Time Distribution Capabilities of the Wide Area Augmentation System ~WAAS!,’’ in Proceedings of the 33rd

  2. Effects of removing Good Hope Mill Dam on selected physical, chemical, and biological characteristics of Conodoguinet Creek, Cumberland County, Pennsylvania

    Science.gov (United States)

    Chaplin, Jeffrey J.; Brightbill, Robin A.; Bilger, Michael D.

    2005-01-01

    3 percent of the area measured before removal. Some of the impounded silt/clay at station 3 and other sed-iment in the work area downstream of the dam were initially entrained over the 3-day removal period and deposited on sub-strate at station 4. Remaining silt/clay at station 3 and deposits at station 4 were transported downstream by the flows mea-sured over the 23 months after removal (daily mean flow ranged from 38 to 5,180 cubic feet per second). The median bed-parti-cle size at station 3 increased by approximately 32 millimeters in the 23-month period after removal. Bed-particle-size distri-bution at station 4 became finer when silt/clay was initially deposited but coarsened as high flows flushed it downstream; median bed-particle size was 77.7 millimeters before removal compared to 31.3 millimeters 17 days after removal and 99 mil-limeters 23 months after removal. Good Hope Mill Dam had either no effect on water-quality characteristics or the effect was so small it was masked by sea-sonal and periodic variability. Measurements of daily mean temperature, dissolved-oxygen concentration, pH, and specific conductance on a short time scale (every 15 minutes) indicate the daily range of temperature was suppressed under impounded conditions and daily extremes of temperature, dis-solved-oxygen concentration, pH, and specific conductance at station 2 were out of phase by approximately 12 hours with station 3. Once the dam was removed, the pattern at station 3 shifted and converged with the pattern at station 2. The offset before removal may be related to a lag time resulting from a decrease in velocity through the impoundment. Total nitrogen and suspended-sediment concentrations increased upon the initial dam breach but were within the range of concentrations measured from March 2001 through April 2002 over varying flow conditions at station 1. Total nitrogen concentration at station 4 was 4.66 milligrams per liter upon the initial breach of the dam,

  3. South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Grisak, Grant; Marotz, Brian

    2003-06-01

    In 1999, Montana Fish, Wildlife & Parks (MFWP) began a program aimed at conserving the genetically pure populations of westslope cutthroat trout in the South Fork Flathead River drainage. The objective of this program is to eliminate all of the exotic and hybrid trout that threaten the genetically pure westslope cutthroat populations in the South Fork Flathead. The exotic and hybrid trout populations occur in several headwater lakes and their outflow streams. In 2001 MFWP released a draft environmental assessment, pursuant to the Montana Environmental Policy Act (MEPA), that addressed the use of motorized equipment to deliver personnel and materials to some of these lakes in the Bob Marshall and Great Bear Wildernesses (Grisak 2001). After a 30-day public comment period, MFWP determined that the complexity of issues was too great and warranted a more detailed analysis. These issues included transportation options for personnel, equipment and materials, the use of motorized equipment in wilderness, fish removal methods, fish stocking, and the status and distribution of amphibian populations in the project area. Because the program also involves the U.S. Forest Service (USFS) and Bonneville Power Administration (BPA), the environmental analysis needs to comply with the National Environmental Policy Act (NEPA). In October 2001, pursuant to NEPA, MFWP, along with the USFS and BPA initiated an environmental assessment to address these issues. In June 2002, the three agencies determined that the scope of these issues warranted an Environmental Impact Statement. This specialist report describes the logistical, technical and biological issues associated with this project and provides an analysis of options for fish removal, transportation and fish stocking. It further analyzes issues and concerns associated with amphibian populations and creating new domesticated stocks of westslope cutthroat trout. Finally, this document provides a description of each lake, the best

  4. Protect Anadromous Salmonids in the Mainstem Corridor, Monitoring and Evaluation, Annual Report 200-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Vigg, Steven; Johnson, John

    2002-02-01

    In this annual Monitoring & Evaluation (M&E) report to the Bonneville Power Administration (BPA), we summarize significant activities and performance measures resultant from enhanced protection by Columbia River Inter-Tribal Fisheries Enforcement (CRITFE) in the mainstem corridor (BPA Project 2000-056). This report covers the Fiscal Year (FY) 2000 performance period -- May 15, 2000 to May 14, 2001. Quarterly progress reports have previously been submitted to BPA and are posted on the M&E Web site (www.Eco-Law.net) -- for the time period April-December 2000 (Vigg 2000b,c,d) and for the period January-June 2001 (Vigg 2001a,b). We also present comprehensive data representing the first quarter of year 2000 in this report for a pre-project comparison. In addition, we have analyzed specific annual enforcement statistics to evaluate trends during the baseline period 1996-2000. Additional statistics and more years of comprehensive baseline data are now being summarized, and will be presented in future M&E annual reports--to provide a longer time series for evaluation of trends in input, output and outcome performance standards.

  5. Lower Granite Dam Smolt Monitoring Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mensik, Fred; Rapp, Shawn; Ross Doug (Washington Department of Fish and Wildlife, Olympia, WA)

    2005-11-01

    The 2004 fish collection season at Lower Granite Dam (LGR) was characterized by above average water temperatures, below average flows and spill, low levels of debris. The number of smolts collected for all species groups (with the exception of clipped and unclipped sockeye/kokanee) exceeded all previous collection numbers. With the continued release of unclipped supplementation chinook, steelhead and sockeye above LGR, we can not accurately distinguish wild chinook, wild steelhead and wild sockeye/kokanee from hatchery reared unclipped chinook and sockeye/kokanee in the sample. Wild steelhead can be identified from hatchery steelhead by the eroded dorsal and pectoral fins exhibited on unclipped hatchery steelhead. The numbers in the wild columns beginning in 1998 include wild and unclipped hatchery origin smolts. This season a total of 11,787,539 juvenile salmonids was collected at LGR. Of these, 11,253,837 were transported to release sites below Bonneville Dam, 11,164,132 by barge and 89,705 by truck. An additional 501,395 fish were bypassed to the river due to over-capacity of the raceways and for research purposes. According to the PTAGIS database, 177,009 PIT-tagged fish were detected at LGR in 2004. Of these, 105,894 (59.8%) were bypassed through the PIT-tag diversion system, 69,130 (39.1%) were diverted to the raceways to be transported, 1,640 (0.9%) were diverted to the sample tank, sampled and then transported, 345 (0.2%) were undetected at any of the bypass, raceway or sample exit monitors.

  6. Temperature, salinity, microplankton abundance and other data from three cruises of the R/V Cape Hatteras in the NW Atlantic to study bacterial activity, August 2001 - March 2002 (NODC Accession 0001675)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data is from three cruises on the R/V Cape Hatteras taken in Aug and October 2001, and March 2002 from Boothbay Harbor Maine to the Sargasso Sea. The purpose of...

  7. Areva reached its objectives in 2002

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    In 2002 the turnover of the Areva group has fallen by 7,1 % from 8,90 milliard euros in 2001 to 8,26 milliard euros. This fall breaks up into -3,6 % for the nuclear sector and -20,7 % for connector engineering. The sharp drop for connector engineering is not surprising and is attributed to the fact that in 2002 there was no revival of business in the market of communication equipment. (A.C.)

  8. 2002 Industry Studies: News Media

    Science.gov (United States)

    2002-01-01

    USAF CAPT John W. Coleman II, USN Reserve Col Christos Dellas , Greek Army Col Tim Fletcher USAF Lt Col Tim Malinski USAF Lt Col Deb Martinez USAF Ms...Majority Support Government Restrictions on War Coverage,” Washington Post, 29 November 2001, Sec. C, p.1. 54 Lucia Moses, “E&P Survey: Circ Bump was...Afghan War,” The Washington Post, 7 December 2001, Sec. A, p. 43. Moses, Lucia , “E&P Survey: Circ Bump was Modest,” Editor & Publisher, 22 April 2002

  9. Norway; Staff Report for the 2002 Article IV Consultation

    OpenAIRE

    International Monetary Fund

    2003-01-01

    This 2002 Article IV Consultation for Norway highlights that the mainland GDP growth edged up to an estimated 1.4 percent in 2002, from 12 percent in 2001, driven by strong consumption growth. Mainland investment and traditional exports slackened, as a result of weak external demand, high real interest rates, and an appreciation of the nominal effective exchange rate by 11.5 percent during 2002. Unemployment remained fairly stable through 2002 as the expansion of the sheltered sector offset e...

  10. The 2002 RPA Plot Summary database users manual

    Science.gov (United States)

    Patrick D. Miles; John S. Vissage; W. Brad Smith

    2004-01-01

    Describes the structure of the RPA 2002 Plot Summary database and provides information on generating estimates of forest statistics from these data. The RPA 2002 Plot Summary database provides a consistent framework for storing forest inventory data across all ownerships across the entire United States. The data represents the best available data as of October 2001....

  11. Changes in a temperate estuary during the filling of the biggest European dam.

    Science.gov (United States)

    Morais, Pedro; Chícharo, Maria Alexandra; Chícharo, Luís

    2009-03-15

    This study aimed to determine whether and how the disruption of river flow, during the filling of the Alqueva dam, influenced the variability of abiotic and biotic factors in the Guadiana estuary, particularly the abundance and distribution of anchovy eggs. River inflow was found to be the most important factor in determining abiotic and biotic variability in the Guadiana estuary. Seasonal patterns were obscured by long periods of low inflow (mid April to early December 2002), which caused marked changes in the estuary. The estuarine turbidity maximum zone was displaced towards the upper estuary, to at least 38 km from the river mouth, 8 to 16 km upstream from previous records. The dynamics of nutrient stoichiometry was also affected. In the upper and middle estuary, P was more potential limiting than N and potential Si limitation was only frequent on the coast, with direct and/or indirect influence in changing phytoplankton dynamics and composition. Previously, the upper estuary alternated between potential P limitation during winter, Si limitation during spring and mid summer and N limitation during mid summer and autumn. The flooding of vast areas in the catchment of the dam probably caused the increase of DSi concentrations, as well as maximal N and P loadings. The abundance of larval stages of anchovy decreased, putatively because estuarine productivity has also decreased. In April 2002 there was an uncontrolled discharge from the Alqueva dam, which reduced the abundance of anchovy eggs by 99.99%. It is suggested that dam managers should mimic, as much as possible, the natural river flow, in order to minimize the impact on downstream ecosystems. Management efforts should not be restricted to the areas upstream of the dam, but should also encompass the estuary and adjacent coastal area.

  12. INIS Progress and Activity Report 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    Highlights of INIS Activities 2002: The International Nuclear Information System (INIS) collects and distributes scientific information in all areas of nuclear science and technology published in Member States, including bibliographic data and the full text of documents - reports, dissertations, etc. - not readily available through commercial channels (the non-conventional literature, NCL). Membership: In 2002 five new Member States joined INIS. The number of participating members was 127 and included 108 countries and 19 International Organizations. Bibliographic Database: In 2002, INIS was able to augment the level and maintain the quality of input into the Bibliographic Database. A total of 71 276 records were added to the database, which represents an increase of 2,7% compared to the production of 2001, and 8,4% compared to 2000. This includes 3 839 bibliographic records prepared as voluntary contribution by INIS Member States1 (an increase of 93% compared to 2001) and 11 428 records prepared as voluntary contribution by the INIS Secretariat (an increase of 173% compared to 2001). There are now 2 347 302 records in the INIS database. The Agency signed an agreement with Elsevier Science BV for the acquisition of electronic bibliographic records. A second agreement has been signed with the American Institute of Physics (AIP), to become operational in 2003, and negotiations are in progress with three other publishers: Springer Verlag, John Wiley and Sons and Thomson ISI. Other sources of electronic records are being investigated.

  13. INIS Progress and Activity Report 2002

    International Nuclear Information System (INIS)

    2003-01-01

    Highlights of INIS Activities 2002: The International Nuclear Information System (INIS) collects and distributes scientific information in all areas of nuclear science and technology published in Member States, including bibliographic data and the full text of documents — reports, dissertations, etc. — not readily available through commercial channels (the non-conventional literature, NCL). Membership: In 2002 five new Member States joined INIS. The number of participating members was 127 and included 108 countries and 19 International Organizations. Bibliographic Database: In 2002, INIS was able to augment the level and maintain the quality of input into the Bibliographic Database. A total of 71 276 records were added to the database, which represents an increase of 2,7% compared to the production of 2001, and 8,4% compared to 2000. This includes 3 839 bibliographic records prepared as voluntary contribution by INIS Member States1 (an increase of 93% compared to 2001) and 11 428 records prepared as voluntary contribution by the INIS Secretariat (an increase of 173% compared to 2001). There are now 2 347 302 records in the INIS database. The Agency signed an agreement with Elsevier Science BV for the acquisition of electronic bibliographic records. A second agreement has been signed with the American Institute of Physics (AIP), to become operational in 2003, and negotiations are in progress with three other publishers: Springer Verlag, John Wiley and Sons and Thomson ISI. Other sources of electronic records are being investigated

  14. Nuclear safety review for the year 2001

    International Nuclear Information System (INIS)

    2002-07-01

    The Nuclear Safety Review for the Year 2001 reports on worldwide efforts to strengthen nuclear and radiation safety, including radioactive waste safety. It is in three parts. Part 1 describes those events in 2001 that have, or may have, significance for nuclear, radiation and waste safety worldwide. It includes developments such as new initiatives in international cooperation, events of safety significance and events that may be indicative of trends in safety. Part 2 describes some of the IAEA's efforts to strengthen international co-operation in nuclear, radiation and waste safety during 2001. It covers legally binding international agreements, non-binding safety standards, and provisions for the application of safety standards. This is done in a very brief manner, because these issues are addressed in more detail in the Agency's Annual Report for 2001. Part 3 presents a brief look ahead to some issues that are likely to be prominent in the coming year(s). The topics covered were selected by the IAEA Secretariat on the basis of trends observed in recent years, account being taken of planned or expected future developments. A draft of the Nuclear Safety Review for the Year 2001 was presented to the March 2002 session of IAEA's Board of Governors. This final version has been prepared taking account of the discussion in the Board. In some places, information has been added to describe developments early in 2002 that were considered pertinent to the discussion of events during 2001

  15. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  16. Development of probabilistic operating rules for Hluhluwe Dam, South Africa

    Science.gov (United States)

    Ndiritu, J.; Odiyo, J.; Makungo, R.; Mwaka, B.; Mthethwa, N.; Ntuli, C.; Andanje, A.

    2017-08-01

    Hluhluwe Dam, with a 30 million m3 reservoir that supplies water for irrigation and Hluhluwe municipality in Kwa-Zulu Natal Province, South Africa, was consistently experiencing low storage levels over several non-drought years since 2001. The dam was operated by rules of thumb and there were no records of water releases for irrigation - the main user of the dam. This paper describes an assessment of the historic behaviour of the reservoir since its completion in 1964 and the development of operating rules that accounted for: i) the multiple and different levels of reliability at which municipal and irrigation demands need to be supplied, and ii) inter-annual and inter-decadal variability of climate and inflows into the dam. The assessment of the behaviour of the reservoir was done by simulation assuming trigonometric rule curves that were optimized to maximize both yield and storage state using the SCE-UA method. The resulting reservoir behaviour matched the observed historic trajectory reasonably well and indicated that the dam has mainly been operated at a demand of 10 million m3/year until 2000 when the demand suddenly rose to 25 million m3/year. Operating rules were developed from a statistical analysis of the base yields from 500 simulations of the reservoir each using 5 year-long stochastically generated sequences of inflows, rainfall and evaporation. After the implementation of the operating rules in 2009, the storage state of the dam improved and matched those of other reservoirs in the region that had established operating rules.

  17. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  18. Limnological study of fresh water of rawal dam, islamabad

    International Nuclear Information System (INIS)

    Leghari, M.K.; Ghafar, S.A.

    2005-01-01

    The limnological study of Fresh water of Rawal Dam was carried out for the first time from June 2000 to May 2001 during Research Project. C-PMNHIBio(311). Data was collected on physico-chemical properties of the Fresh water and the Algal Flora. The fluctuations of temperature, pH, Dissolved oxygen, salinity, T.D.S., Total hardness etc., were studied. From algal flora, a total. 291 algal species were found to belong to 108 genera 10 Phylum. From Cyanophyta, 68 species belongs to 21 genera with 23.37%, Volvocophyta 107 species belongs to 40 genera with 36.77%, Chlorophyta 18 species belongs to 13 genera with 6.19%, Bacillariophyta 66 species 19 genera with 22.67%, Chrysophyta 3 species belongs to 2 genera with 1.03%, Xanthophyta 5 species belongs to 5 genera with 1.72%, Vaucheriophyta 1 species belongs to 1 genus with 0.34%, Euglenophyta 16 species belongs to 4 genera with 1.72%, Dinophyta 5 species belongs to 2 genera with 1.72%, Charophyta 2 species belong to 1 genus with 0.7%, were recorded and classified by latest classification according to Shameel (2001). The present work shows the changes in physico-chemical factor along with algal flora in Rawal Dam during collection period and co-relation of different factors. (author)

  19. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations, and guilds.

  20. Caracterización final y lecciones de la epidemia de dengue 3 en Cuba, 2001-2002 Final characterization of and lessons learned from the dengue 3 epidemic in Cuba, 2001-2002

    Directory of Open Access Journals (Sweden)

    María G. Guzmán

    2006-04-01

    Full Text Available Over the past 10 years, the American Region has witnessed the reintroduction and dissemination of dengue virus serotype 3. In this paper we describe the main clinical and epidemiologic features of the dengue 3 epidemic that broke out in Cuba between June 2001 and March 2002, as well as the measures that were undertaken to eliminate it. A total of 14 524 confirmed cases were reported, 12 889 (88,7% of them in the City of Havana. Eighty-one cases of dengue hemorrhagic fever were confirmed, three of which died. Secondary infection, white skin color, sickle cell anemia, and bronchial asthma were risk factors for dengue hemorrhagic fever. Active clinical and epidemiologic surveillance and laboratory support were critical to the early detection of transmission and to the monitoring of the epidemic. Widespread involvement of the community and its different sectors, participation of the mass media with a single leadership in command, and strong political will were the key factors that made it possible to eliminate transmission. This epidemic was one more example of the risk of dengue epidemics faced by countries in the area, including those that have strong surveillance and control programs. It also served to show that by applying the principles established by the Pan American Health Organization and the World Health Organization for dengue control, transmission can be stopped.

  1. Best Science Fiction, Fantasy, and Horror 2001.

    Science.gov (United States)

    Voice of Youth Advocates, 2002

    2002-01-01

    Presents an annotated bibliography of 81 science fiction, fantasy, and horror genre titles that were judged best-reads by reviewers in "Voice of Youth Advocates" from June 2001 through April 2002. (LRW)

  2. Assessing geomorphic change along the Trinity River downstream from Lewiston Dam, California, 1980-2011

    Science.gov (United States)

    Curtis, Jennifer A.; Wright, Scott A.; Minear, Justin T.; Flint, Lorraine E.

    2015-01-01

    The Trinity River Restoration Program, one of the nation’s largest adaptively managed river restoration programs, requires periodic assessment to determine the effectiveness of management actions in restoring channel dynamics and habitat features. This study documents riparian and channel changes along an intensively managed 65-kilometer reach of the Trinity River in California, downstream from Lewiston Dam. The two primary periods of interest, from 1980 to 2001 and from 2001 to 2011, are separated by a shift in restoration activities mandated by the U.S. Department of the Interior December 2000 Record of Decision. The post-2001 restoration strategy increased managed-flow releases, gravel augmentation, watershed restoration, and mechanical channel rehabilitation.

  3. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  4. Above Bonneville passage and propagation cost effectiveness analysis

    International Nuclear Information System (INIS)

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region

  5. Above Bonneville Passage and Propagation Cost Effectiveness Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region.

  6. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

    2005-11-01

    initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope

  7. Annual Program Progress Report under DOE/PHRI Cooperative Agreement: (July 1, 2001-June 30, 2002)

    Energy Technology Data Exchange (ETDEWEB)

    Palafox, Neal A., MD, MPH

    2002-07-31

    OAK B188 DOE/PHRI Special Medical Care Program in the Republic of the Marshall Islands (RMI)Annual Program Progress Report. The DOE Marshall Islands Medical Program continued, in this it's 48th year, to provide medical surveillance for the exposed population from Rongelap and Utrik and the additional DOE patients. The program was inaugurated in 1954 by the Atomic Energy Commission following the exposure of Marshallese to fallout from a nuclear test (Castle Bravo) at Bikini Atoll. This year marks the fourth year in which the program has been carried out by PHRI under a cooperative agreement with DOE. The DOERHRI Special Medical Care Program, awarded the cooperative agreement on August 28, 1998, commenced its health care program on January 15, 1999, on Kwajalein and January 22, 1999, on Majuro. This report details the program for the July 1, 2001, through the June 30, 2002, period. The program provides year-round, on-site medical care to the DOE patient population residing in the Republic of the Marshall Islands (RMI) and annual examinations to those patients living in Hawaii and on the Continental U.S.

  8. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  9. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon O. nerka smolts during the 2003 spring out-migration at migrant traps on the Snake River and Salmon River. In 2003 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 2.1 times less in 2003 than in 2002. The wild Chinook catch was 1.1 times less than the previous year. Hatchery steelhead trout catch was 1.7 times less than in 2002. Wild steelhead trout catch was 2.1 times less than the previous year. The Snake River trap collected 579 age-0 Chinook salmon of unknown rearing. During 2003, the Snake River trap captured five hatchery and 13 wild/natural sockeye salmon and 36 coho salmon O. kisutch of unknown rearing. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. The significant differences in catch between 2003 and the previous year were due mainly to low flows during much of the trapping season and then very high flows at the end of the season, which terminated the trapping season 12 days earlier than in 2002. Trap operations began on March 9 and were terminated on May 27. The trap was out of operation for a total of zero days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 16.8% less and wild Chinook salmon catch was 1.7 times greater than in 2002. The hatchery steelhead trout collection in 2003 was 5.6% less than in 2002. Wild steelhead trout collection was 19.2% less than the previous year. Trap operations began on March 9 and were terminated on May 24 due to high

  10. International nuclear power status 2002

    International Nuclear Information System (INIS)

    Lauritzen, B.; Majborn, B.; Nonboel, E.; Oelgaard, P.L.

    2003-03-01

    This report is the ninth in a series of annual reports on the international development of nuclear power with special emphasis on reactor safety. For 2002, the report contains: 1) General trends in the development of nuclear power; 2) Decommissioning of the nuclear facilities at Risoe National Laboratory: 3) Statistical information on nuclear power production (in 2001); 4) An overview of safety-relevant incidents in 2002; 5) The development in West Europe; 6) The development in East Europe; 7) The development in the rest of the world; 8) Development of reactor types; 9) The nuclear fuel cycle; 10) International nuclear organisations. (au)

  11. Climate Assessment for 2002

    Science.gov (United States)

    Waple, A. M.; Lawrimore, J. H.

    2003-04-01

    It is the thirteenth year that the Climate Assessment has been written to summarize the state of the earth's climate, and the third year that the National Climatic Data Center has taken the lead in its production. It is a cooperative effort that includes contributions from scientists around the country and the world. Neutral ENSO conditions at the beginning of 2002 gave way to a strengthening El Niño episode during late boreal summer and continuing into early winter. Weather patterns across the world began to reflect the positive ENSO conditions during the boreal autumn. Global temperatures in 2002 were 0.56°C above the long-term (1880-2001) average, which places 2002 as the second warmest year on record. Land temperatures were 0.89°C above average and ocean temperatures were 0.42°C above the 1880-2001 mean. This ranks both land and ocean as second warmest on record. The Northern Hemisphere temperature continues to average near record levels in 2002 at 0.63°C above the long-term average. The Southern Hemisphere also reflects the globally warmer conditions, with a positive anomaly of 0.47°C. Annual anomalies in excess of 1.0°C were widespread across much of Russia, Eastern Europe, Alaska, and central South America, while significantly cooler than average conditions were confined to the eastern half of Canada, southern South America and the eastern Pacific Ocean, near the coast of the United States. Although 12 tropical storms developed in the Atlantic during the boreal summer of 2002, most of them were weak and short-lived leading to a slightly below normal season in terms of overall activity, which is consistent with the developing El Nino. However, seven tropical storms made landfall on the coast of the United States, with an eighth brushing the coast of North Carolina. Hurricane Lili was the first hurricane to impact the U.S. directly in three years. Other notable aspects of the climate in 2002 include extreme drought in parts of the U.S., Canada and

  12. CRAF 2002 - An Analysis of CRAF Participation Since September 2001

    National Research Council Canada - National Science Library

    Teagan, Shawn E

    2002-01-01

    This paper analyzes Civil Reserve Air Fleet (CRAF) participation prior to and after the terrorist attacks of 11 September 2001, to determine if the events of that day caused a change in air carrier participation...

  13. 2002 GUIDELINES FOR ADVANCEMENT AND PROMOTION

    CERN Document Server

    Human Resources Division

    2002-01-01

    1. General Following the various Weekly Bulletin announcements concerning the new Merit Advancement and Promotion Scheme (MAPS), the Director-General has now fixed the guidelines and schedule for the 2002 annual advancement review as summarised below. The full details have been presented to the Management Board and to the Standing Concertation Committee. The guidelines correspond to the information given in the document 'An overview of the Merit Advancement and Promotion Scheme (MAPS) and implementation measures' dated 11 July 2001. The procedures will follow those given in the recently published Administrative Circular 26 (Rev. 3) except that the annual interview programme is extended to the completion date of 31 March 2002. As in previous years, decisions will be made, where possible, by 1 July 2002 except for career path changes for staff in Career Paths A to D which will be made by 31 October 2002 and applied retroactively to 1 July 2002. 2. Budget guidelines The budget allocation for the annual part of a...

  14. Evidence of deepwater spawning of fall chinook salmon (Oncorhynchus tshawytscha): spawning near Ives and Pierce Island of the Columbia River, 1999; ANNUAL

    International Nuclear Information System (INIS)

    Mueller, Robert P.; Dauble, Dennis D.

    2000-01-01

    Fall chinook salmon Oncorhynchus tshawytscha, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by Washington Department of Fisheries and Wildlife (WDFW) biologists in 1993 (Hymer 1997). Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and Ives island. Limited spawning ground surveys were conducted in the area around Ives and Pierce Islands during 1994-1997 and based on these surveys it was believed that fall chinook salmon successfully spawned in this area. The size of this population from 1994 to 1996 was estimated at 1,800 to 5,200 fish (Hymer 1997). Recently, chum salmon were also documented spawning downstream of Bonneville Dam. Chum salmon O. kisutch were listed as threatened under the Endangered Species Act (ESA) in March, 1999. There are several ongoing investigations to define the physical habitat characteristics associated with fall chinook and chum salmon spawning areas downstream of Bonneville Dam. A major concern is to determine what flows (i.e. surface elevations) are necessary to ensure their long-term survival. Our objective was to locate deepwater spawning locations in the main Columbia River channel and to collect additional data on physical habitat parameters at the site. This objective is consistent with the high priority that the Northwest Power Planning Council's Independent Advisory Board and the salmon managers have placed on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin

  15. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  16. Abandonment of the low level outlet structure at the McGregor South Dam

    Energy Technology Data Exchange (ETDEWEB)

    Mack, D.L; Murray, T.K. [Klohn-Crippen Consultants Ltd., Calgary, AB (Canada); Soutar, B.M. [Alberta Transportation, Edmonton, AB (Canada)

    2008-07-01

    The Carseland-Bow River Headworks (CBRH) is a major multi-purpose water delivery system, situated in southern Alberta. It supplies water to 87,000 hectares of agricultural land and several municipalities. The system was originally built starting in 1909. It consists of diversion works on the Bow River, 65 kilometres of canal, and the McGregor and Little Bow reservoirs. In the 1950s, the system was rehabilitated by the Prairie Farm Rehabilitation Administration (PFRA), and Travers Reservoir was added in 1954. In 1973, ownership and operation of the CBRH system was turned over to Alberta Environment. In 2001, Alberta Transportation implemented a major program to rehabilitate and upgrade the CBRH system. This program included increasing the capacity of the canals and structures, and upgrading the dams to meet current dam safety guidelines. The project involved raising the north and south dams, providing an auxiliary spillway to accommodate the probable maximum flood (PMF), and rehabilitating the existing reservoir inlet and low level outlet structures. This paper discussed the abandonment of the existing low level outlet structure located within the south dam. The paper discussed the existing dams and outlet structure as well as the south dam and outlet structure. The abandonment of the existing low level outlet structure was discussed in terms of general construction; demolition; upstream conduits and gatewell; and downstream conduit. Several illustrations and photographs of the dam and the demolition were presented. It was concluded that the in-place abandonment of the existing low level outlet structure at the McGregor South Dam provides significant advantages, including eliminating the need to construct and remove an extensive cofferdam within the reservoir. 6 refs., 2 tabs., 4 figs.

  17. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  18. Bonneville Power Administration: financial fallout from termination of WPPSS nuclear projects 4 and 5. Oversight hearings before the Subcommittee on Mining, Forest Management, and Bonneville Power Administration of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-Eighth Congress, First Session, February 14 and 15, 1983

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Peter T. Johnson, Administrator of the Bonneville Power Administration, and a representative of the Washington Public Power Supply System (WPPSS) described the financial situation resulting from the cancellations and cost overruns of WPPSS nuclear projects that have left the area with an unacceptable debt. Four panels representing area utilities and electric cooperatives described their financial positions on the second day of hearings. Two appendices with additional material from Bonneville, WPPSS, the Department of the Interior, and others follow the testimony

  19. Perfil dos cães sororreagentes para aglutininas anti-Leptospira interrogans em Belo Horizonte, Minas Gerais, 2001/2002 Serological profile of seropositive dogs to anti-Leptospira interrogans agglutinins in Belo Horizonte, Minas Gerais, Brazil, 2001-2002

    Directory of Open Access Journals (Sweden)

    D.F. Magalhães

    2007-10-01

    Full Text Available The serological profile of seropositive dogs according to anti-Leptospira agglutinins was checked in Belo Horizonte including variables such as race, sex, age and whether the dog had an owner or not. The dogs were captured by the Zoonosis Control Center in nine neighborhoods around the city and were separated in two categories - with owners or captured on the streets. The prevalence of anti-Leptospira agglutinins was evaluated in 3,417 blood samples using the microscopic agglutination test (MAT from September 2001 to September 2002. It was found that 13.1% of the dogs had seropositive results with the most reactive serovars being Canicola (7.0%, Ballum (6.1%, Pyrogenes (3.2% and Icterohaemorrhagiae (2.9%. The prevalence of other serovars was less than 1.0%. Greater prevalence was found in male, crossbred dogs, without owners. There were no significant results due to age in 95% (P=0.808 of the cases. According to the results, more research should be done in order to isolate and classify the serovars in positive dogs, especially Ballum and Pyrogenes, which will suggest their inclusion in the commercial vaccines against leptospira used in dogs in this city.

  20. National trends and outcomes of hospitalizations for pulmonary hypertension in Spain (2001-2014).

    Science.gov (United States)

    de-Miguel-Díez, Javier; López-de-Andrés, Ana; Hernandez-Barrera, Valentin; Jimenez-Trujillo, Isabel; de-Miguel-Yanes, Jose María; Mendez-Bailón, Manuel; Jimenez-Garcia, Rodrigo

    2018-04-07

    To assess changes in incidence, diagnostic procedures, comorbidity profiles, length of hospital stay (LOHS), costs, and in-hospital mortality (IHM) for patients hospitalized with pulmonary hypertension (PH). We included patients hospitalized with PH in Spain from 2001 to 2014. The data were collected from the National Hospital Discharge Database. We included 644,436 discharges (43.31% males and 56.09% females) admitted for primary PH (8.34%) or secondary PH (91.66%). The crude incidence rate increased from 58.67 to 148.32 hospitalizations per 100,000 inhabitants between 2001 and 2002 and 2013-2014 (p < 0.001). The percentage of patients with a Charlson comorbidity index ≥2 was 27.87% in 2001-2002, increasing to 47.02% in 2013-2014 (p < 0.001). IHM was 8.77%, with a reduction in the value yielded by the multivariable analysis between 2009 and 2010 and 2013-2014. Median LOHS was 9 ± 9 days in 2001-2002, which decreased to 7 ± 8 days in 2013-2014 (p < 0.001). The mean cost per patient increased from €3352.4 ± €1495 in the period 2001-2002 to €4198.94 ± €1287.96 in 2013-2014 (p < 0.001). Despite the increase over time in hospital admissions for PH, associated comorbidity, and costs, LOHS and IHM decreased, suggesting that the management of PH-related hospitalizations improved in Spain during the study period. Copyright © 2018 Elsevier B.V. All rights reserved.

  1. A Survey of the Invasive Aquatic and Riparian Plants of the Low Rio Grande

    Science.gov (United States)

    2005-04-01

    many areas. In 2001 and 2003, surveys were conducted starting below Amistad Reservoir to immediately below Falcon Reservoir to assess the...River were surveyed from Amistad Reservoir to Anzulduas Dam for the presence of hydrilla and other invasive aquatic weed species (Grodowitz et al...to difficulties in accessing the river. During the 2001 survey, hydrilla was found in Amistad Reservoir and below Falcon Reservoir. In August 2002

  2. Environmental report 2001 - Verbund Austria Power Grid

    International Nuclear Information System (INIS)

    2002-01-01

    A balance of the environmental activities performed by Verbund Austria Power Grid during 2001 is presented. It comprises which measures were taken to reach their environmental objectives: certification of an environmental management system according to ISO 14001 and EMAS, environmental protection, policies, water and thermoelectric power generation status ( CO 2 , SO 2 , NO x emission monitoring, energy efficiency, replacement of old equipment), reduction of the greenhouse gases emissions and nature conservation. The report is divided in 8 sections: power grid, environmental policy, environmental management, power grid layout, environmental status of the system, introduction of new technologies for environmental monitoring, environmental objectives 2001 - 2002, and data and facts 2001. (nevyjel)

  3. Monitoring of downstream salmon and steelhead at Federal hydroelectric facilities. Annual report 1993

    International Nuclear Information System (INIS)

    Wood, L.A.; Martinson, R.D.; Graves, R.J.; Carroll, D.R.; Killins, S.D.

    1994-04-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basin juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis

  4. International wind energy development. World market update 2001. Forecast 2002-2006

    International Nuclear Information System (INIS)

    2002-03-01

    In the year 2001, the wind power development took another major step forward. Installed capacity set a new record with the addition of 6,824 MW of new generating capacity. This is 2,329 MW more than the record set in year 2000. Growth in new capacity is up from 15% in year 2000 to 52% in 2001. This confirmed that the trend of wind energy being the preferred technology over other technologies for new generating capacity is continuing. Europe is the leading region for wind power. Of the new capacity added in 2001, 4,527 MW was installed in Europe. Germany once more shows this country's potential as the single most active market with the installation of 2,627 MW in new capacity, nearly 1,000 MW more than in the previous year. Germany consolidated its position as the world's leading developer of wind energy. The market in the US is once again the second largest wind energy market ahead of Spain. The expiration of the PTC at the end of the year 2001 gave some rush in the installation at the end of the year. The Danish market is on a deroute and lost pace completely in a changed political climate which means that the development of windpower is slowing down. Denmark has a very high penetration of windpower. On the supplier side Vestas Wind Systems A/S maintained its position as being the world's largest manufacturer of wind turbines. Vestas Wind Systems is now followed by Enercon GmbH. Without counting the US market figures Vestas Wind Systems A/S and Enercon has become the very closed in terms of sold MW. In the 3rd place is the Danish company NEG Micon A/S. Newcomers in the Top Ten list are Mitsubishi (JP) and REpower (GE). The most significant technological trend in the market is the continuing upscaling of machines. From year 2001 the average size of WTGs is 915 kW (in 2000: 800kW). In the very near future there will be erected wind turbines mainly dedicated for the upcoming offshore market of 4.5-5.0 MW. On Offshore there is only 10 MW installed during the year 2001

  5. Japan`s largest composition dam, aiming for harmony with nature. Chubetsu dam; Shizen tono chowa wo mezasu, Nippon ichi no fukugo dam. Chubetsu dam

    Energy Technology Data Exchange (ETDEWEB)

    Mizushima, T. [Hokkaido Development Bureau, Hokkaido Development Agency, Sapporo (Japan)

    1994-08-15

    This paper introduces Chubetsu Dam planned with a large-scale embankment having a river bed width of 600 m. Chubetsu Dam is being constructed with such objectives as flood control of Ishikari River, river flow rate maintenance, drinking water supply, irrigation water supply and power generation. The dam site is a gravel bed having a river bed width of 600 m and a maximum foundation rock thickness of 40 m, requiring evaluations as a dam foundation and discussions of water shielding methods. As a result of discussions at the Chubetsu Dam technical discussion committee, the dam type is decided to be a composition dam consisting of a gravity type concrete dam on the left river side and a central core type fill dam using a part of the gravel bed as the foundation on the right river side. A continuous underground wall system is planned to be used for shielding water in the gravel foundation. In discussing the anti-seismic properties, analyses for bank construction and water filling to derive stress and deformation conditions prior to an earthquake and a time-history response analysis to derive conditional changes during the earthquake are performed. According to the results thereof, evaluations are given on the safety by compounding the stress and the acceleration. In plans to improve the surrounding areas, an area will be provided upstream the reservoir where the water level is kept constant to serve as a bird sanctuary. 7 figs.

  6. Centre de Spectrometrie Nucleaire et de Spectrometrie de Masse - CSNSM/Centre for nuclear and mass spectroscopy, Activity Report 2001-2002

    International Nuclear Information System (INIS)

    2003-01-01

    The Centre for nuclear and mass spectroscopy (CSNSM) is a CNRS (National Centre for Scientific Research) laboratory affiliated with Paris-Sud University. The CSNSM is involved in pluri-disciplinary activities covering various scientific domains: Nuclear Structure (SNO), Nuclear Astrophysics (AN), Solid State Astrophysics (AS), Solid State Physics (PS) and Chemical Physics of Irradiation. This document presents the activity of the Centre during the 2001-2002 years: 1 - Foreword; 2 - Research topics: Nuclear structure; EFIX: study of exotic nuclei-induced fission; Nuclear Astrophysics; Accelerator-based mass spectroscopy; Solid State Astrophysics; Physics and Chemistry of Irradiation; Solid State Physics; SEMIRAMIS (ion source and ion beam handling); Digest science; 3 - Publications; 4 - Dissertations; 5 - Seminars; 6 - Technical services: Computer Department; Electronics Group; Mechanics Department; Permanent training; Health and safety; 7 - Staff

  7. Magnetismo 2001

    Science.gov (United States)

    Cardús, J. O.; Curto, J. J.; Sanclement, E.; Torta, J. M.

    This CD-ROM presents the digital version of the Boletin del Observatorio del Ebro Magnetismo. It contains data obtained in the Magnetic Station of the Ebre Observatory during the year 2001. The structure of the CD-ROM consists of one directory numbered with the year of the measurement. There, it could be found the bulletin as printable sheets (Year.pdf) generate with Adobe Acrobat and data files in plain ASCII text (Year.wdc) readable with any text editor. These data files were compiled according to the data exchange format recommended by the IAGA-2002.

  8. Environmental taxes and subsidies 2002

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    The statistics presents statements of environmental taxes for the period 1970 - 2002 and statements of environmentally related subsidies for the years 1996 - 2002. Environmental taxes are a concept for pollution, energy, transportation, and resource related taxes. The State's revenue from environmental taxes have increased from 4,0 billions DKK in 1970 to 65,7 billions DKK in 2002. The environmental taxes' part of the GNP has increased from 3,2 % in 1970 to 4,8 % in 2002. The part of the environmental taxes of the total taxes and tariffs has increased from 8,2 % in 1970 to 9,8 % in 2002. >From 2001 to 2002 the environmental taxes increased with 5,6 %, primarily because the taxes in the transportation sector increased with 13,5 % due to more new cars. The pollution taxes increased with 6 % while the environmental taxes for energy increased with only 0,8 %. In 2002 the energy related taxes amounted to 54 %, the transport related taxes to 39 %, and pollution and resource related taxes amounted to 7 % of the total environmental taxes. The public environmentally related subsidies to companies and households has been on a stable level of a little more than 10 billions DKK through the latest years. The energy related subsidies have, however, been transferred to transport related subsidies, i.e. primarily subsidies to the public transport. (ln)

  9. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    Science.gov (United States)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    In the literature, there is information regarding the first deformation and displacement measurements in dams that were conducted in 1920s Switzerland. Todays, deformation measurements in the dams have gained very different functions with improvements in both measurement equipment and evaluation of measurements. Deformation measurements and analysis are among the main topics studied by scientists who take interest in the engineering measurement sciences. The Working group of Deformation Measurements and Analysis, which was established under the International Federation of Surveyors (FIG), carries out its studies and activities with regard to this subject. At the end of the 1970s, the subject of the determination of fixed points in the deformation monitoring network was one of the main subjects extensively studied. Many theories arose from this inquiry, as different institutes came to differing conclusions. In 1978, a special commission with representatives of universities has been established within the FIG 6.1 working group; this commission worked on the issue of determining a general approach to geometric deformation analysis. The results gleaned from the commission were discussed at symposiums organized by the FIG. In accordance with these studies, scientists interested in the subject have begun to work on models that investigate cause and effect relations between the effects that cause deformation and deformation. As of the scientist who interest with the issue focused on different deformation methods, another special commission was established within the FIG engineering measurements commission in order to classify deformation models and study terminology. After studying this material for a long time, the official commission report was published in 2001. In this prepared report, studies have been carried out by considering the FIG Engineering Surveying Commission's report entitled, 'MODELS AND TERMINOLOGY FOR THE ANALYSIS OF GEODETIC MONITORING OBSERVATIONS

  10. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  11. “Learning it the Hard Way”: Social safeguards norms in Chinese-led dam projects in Myanmar, Laos and Cambodia

    International Nuclear Information System (INIS)

    Kirchherr, Julian; Matthews, Nathanial; Charles, Katrina J.; Walton, Matthew J.

    2017-01-01

    Chinese dam developers claim to construct at least every second dam worldwide. However, scholarly literature comprehensively investigating the social safeguard norms in these projects is rare. This paper analyses social safeguard norms in Chinese-led dam projects in Myanmar, Laos and Cambodia, hotspots of Chinese-led dam construction. We find that social safeguard norms adopted have significantly changed in the past 15 years. While Chinese dam developers claimed to adopt standards of the host countries upon the launch of China's Going Out Policy in 2001, with occasional adoption of more demanding Chinese standards, they did not adopt international norms. In recent years, however, they increasingly take into account international norms. We argue that the root cause for this change is social mobilization, with the suspension of the Myitsone Dam in 2011 as a particular game changer. Enhanced social safeguard legislation in host countries and China, stricter rules of Chinese funders and cooperation of Chinese dam developers with international players have also facilitated this change. - Highlights: • Very first regional case study on social safeguard norms in Chinese-led dam projects in Myanmar, Laos and Cambodia. • Found that Chinese dam developers increasingly take into account international social safeguards norms. • Root cause is social mobilization, with the suspension of the Myitsone Dam in 2011 as a particular game changer.

  12. Soil gas composition from the 2001-2002 fissure in the Lakki Plain (Nisyros Island, Greece): evidences for shallow hydrothermal fluid circulation

    Science.gov (United States)

    Venturi, Stefania; Tassi, Franco; Kanellopoulos, Christos; Vaselli, Orlando; Caponi, Chiara; Ricci, Andrea; Raspanti, Alessio; Gallorini, Andrea; Cabassi, Jacopo; Vougioukalakis, Georges

    2016-04-01

    Nisyros volcano (Aegean Sea, Greece) is currently classified in the "Very High Threat" category (Kinvig et al., 2010). Although the last volcanic activity, consisting of phreatic eruptions, occurred in the 19th century, Nisyros experienced an intense seismic activity during 1996-1998 accompanied by ground deformation and changes in the chemistry of fumarolic gases (Chiodini et al., 2002), pointing to a renewed unrest. Between November 2001 and December 2002, a NNE-oriented 600 m long fissure opened in the vegetated central part of the Lakki Plain. The fissure, 1-5 m wide and up to 15-20 m deep, showed neither vertical displacements nor gas release. No changes in the seismic and volcanic activity were observed during or after this event, which was interpreted as related to collapse of the upper caldera floor fine sediment cover (permeable sediment cover in the Lakki Plain conceals the underneath hydrothermal gas flow, preventing the typical surface manifestations (high temperature and CO2 flux), the chemistry of the interstitial gases reveals that deep-sourced fluids circulate within the deep permeable layers beneath the Lakki Plain enhancing alteration processes and formation of shallow collapsing structures. Chiodini G., Brombach T., Caliro S., Cardellini C., 2002. Geophys Res Lett, 29(16), 1759. Kinvig H.S., Winson A., Gottsmann J., 2010. Nat Hazards Earth Syst Sci, 10. Vougioukalakis G.E., Fytikas M., 2005. In Fytikas M., Vougioukalakis G.E. (Eds.), The South Aegean Active Volcanic Arc, Present Knowledge and Future Perspectives, Developments in Volcanology, Elsevier, Amsterdam The Netherlands, 2005, pp. 161-163.

  13. Habitat Evaluation Procedures (HEP) Report; Steigerwald Lake National Wildlife Refuge, Technical Report 2000-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Allard, Donna

    2001-09-01

    Steigenvald Lake National Wildlife Refuge (NWR, refuge) was established as a result of the U. S. Army Corps of Engineers (COE) transferring ownership of the Stevenson tract located in the historic Steigerwald Lake site to the U.S. Fish and Wildlife Service (FWS, Service) for the mitigation of the fish and wildlife losses associated with the construction of a second powerhouse at the Bonneville Dam on the Columbia River and relocation of the town of North Bonneville (Public Law 98-396). The construction project was completed in 1983 and resulted in the loss of approximately 577 acres of habitat on the Washington shore of the Columbia River (USFWS, 1982). The COE determined that acquisition and development of the Steigenvald Lake area, along with other on-site project management actions, would meet their legal obligation to mitigate for these impacts (USCOE, 1985). Mitigation requirements included restoration and enhancement of this property to increase overall habitat diversity and productivity. From 1994 to 1999, 317 acres of additional lands, consisting of four tracts of contiguous land, were added to the original refuge with Bonneville Power Administration (BPA) funds provided through the Washington Wildlife Mitigation Agreement. These tracts comprised Straub (191 acres), James (90 acres), Burlington Northern (27 acres), and Bliss (9 acres). Refer to Figure 1. Under this Agreement, BPA budgeted $2,730,000 to the Service for 'the protection, mitigation, and enhancement of wildlife and wildlife habitat that was adversely affected by the construction of Federal hydroelectric dams on the Columbia River or its tributaries' in the state of Washington (BPA, 1993). Lands acquired for mitigation resulting from BPA actions are evaluated using the habitat evaluation procedures (HEP) methodology, which quantifies how many Habitat Units (HUs) are to be credited to BPA. HUs or credits gained lessen BPA's debt, which was formally tabulated in the Federal Columbia

  14. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.; McKinstry, C.; Simmons, C. (Pacific Northwest National Laboratory)

    2003-01-01

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the second year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The 2002 study period extended from May 18 through July 30. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. The prototype system consisted of six strobe lights affixed to an aluminum frame suspended vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, were aimed to illuminate a specific region directly upstream of the barge. Three light level treatments were used: 6 of 6 lights on, 3 of 6 lights on, and all lights off. These three treatment conditions were applied for an entire 24-hr day and were randomly assigned within a 3-day block throughout the study period. A seven

  15. Damming evidence : Canada and the World Commission on Dams

    Energy Technology Data Exchange (ETDEWEB)

    Vert, P.; Parkinson, B.

    2003-06-01

    Large hydroelectric projects have been met with strong resistance from affected communities, particularly indigenous groups who have been displaced from their flooded communities following the damming of a river. The World Commission on Dams (WCD) was formed in 1998 to review the effectiveness of large dams and develop internationally acceptable guidelines and standards for large dams or hydro energy projects. The Canadian government, through the Canadian International Development Agency, was one of many governments to fund the WCD. However, the authors argue that despite the financial support, the Canadian government was absent from any effort to follow-up on the recommendations of the WCD. The seven strategic priorities in the decision making process include: (1) gaining public acceptance, (2) comprehensive option assessment of water, energy, food and development needs, (3) addressing existing dams to improve the benefits that can be derived from them, (4) sustaining livelihoods, (5) recognizing the entitlements and sharing benefits, (6) ensuring compliance, and (7) sharing rivers for peace, development and security. This report offers a means to assess planned or existing dams and presents a set of guidelines for good practices linked to the seven strategic priorities. Ten case studies from around the world were presented, including the Three Gorges Dam in China. 154 refs., 3 figs., 3 appendices.

  16. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  17. Proceedings of the 2010 Canadian Dam Association's public safety around dams workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Nearly 30 people have drowned in dam-related incidents over the last 10 years in Canada. The Canadian public is now calling for improved safety guidelines. Public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. However, many members of the public are not aware of the dangers posed by dams. This workshop provided a forum to discuss proposals for a draft publication of the Canadian Dam Association (CDA) guidelines for public safety and security around dams. Issues related to current legislation and liability were discussed. Methods of increasing public awareness of the hazards posed by dams included increased signage in dam locations, the use of audible and visual alert systems, and the use of booms and buoys. The responsibilities of dam owners in ensuring the safety of dams were also discussed. The conference featured 5 presentations, of which 2 have been catalogued separately for inclusion in this database. tabs., figs.

  18. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  19. Operating experience from Swedish nuclear power plants 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The total production of electricity from Swedish nuclear power plants was 65.6 TWh during 2002, which is a decrease compared to 2001. The energy capability factor for the 11 Swedish reactors averaged 80.8%. The PWRs at Ringhals averaged 87.6%, while the BWRs, not counting Oskarshamn 1, reached 89.2%. No events, which in accordance to conventions should be reported to IAEA, have occurred during 2002. Operational statistics are presented for each Swedish reactor. The hydroelectric power was 66 TWh, 16% lower than 2000. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 10.9 TWh. The electricity generation totalled 143 TWh, considerably less than the record high 2001 figure of 158.7 TWh. The preliminary figures for export were 14.8 TWh and and for import 20.1 TWh.

  20. Late Pleistocene Hansel Valley basaltic ash, northern Lake Bonneville, Utah, USA

    Science.gov (United States)

    Miller, D.M.; Oviatt, Charles G.; Nash, B.P.

    2008-01-01

    The Hansel Valley ash bed lies within 5 cm of the base of deposits of Lake Bonneville (???28 ka) in the vicinity of Great Salt Lake and provides a useful stratigraphic marker for this area of the lake basin. However, it has not been matched to an eruptive edifice, presumably because such an edifice was eroded by waves of Lake Bonneville. We present data for the chemical composition of the tephra and for possible matching lavas and tephras of the region, as well as grain size data for the tephra in an attempt to identify the location of the eruption. Matches with other tephras are negative, but lavas near the coarsest ash deposits match well with the distinctive high values of TiO2 and P2O5 of the ash. Neither chemistry nor grain size data points uniquely to a source area, but an area near the northwest shore of Great Salt Lake and within Curlew Valley is most likely. The Hansel Valley ash is an example of an ash that has no direct numerical date from proximal deposits, despite considerable study, yet nonetheless is useful for stratigraphic studies by virtue of its known stratigraphic position and approximate age. Basaltic tephras commonly are not as widespread as their rhyolitic counterparts, and in some cases apparently are produced by eruptive sources that are short lived and whose edifices are not persistent. ?? 2007 Elsevier Ltd and INQUA.

  1. Kootenai River Focus Watershed Coordination, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kruse, Gretchen (Kootenai River Network, Libby, MT)

    2002-07-01

    The 2001-2002 Kootenai River Network Annual Report reflects the organization's defined set of goals and objectives, and how by accomplishing these goals, we continue to meet the needs of communities and landowners throughout the Kootenai River Basin by protecting the resource. Our completed and ongoing projects throughout the watershed reflect the cooperation and support received and needed to accomplish the rehabilitation and restoration of critical habitat. They show that our mission of facilitation through collaboration with public and private interests can lead to improved resource management, the restoration of water quality and the preservation of pristine aquatic resources. Our vision to empower local citizens and groups from two states, one province, two countries and affected tribal nations to collaborate in natural resource management within the basin is largely successful due to the engagement of the basin's residents--the landowners, town government, local interest groups, businesses and agency representatives who live and work here. We are proof that forging these types of cooperative relationships, such as those exhibited by the Kootenai River subbasin planning process, leads to a sense of entitlement--that the quality of the river and its resources enriches our quality of life. Communication is essential in maintaining these relationships. Allowing ourselves to network and receive ideas and information, as well as to produce quality, accessible research data such as KRIS, shared with like organizations and individuals, is the hallmark of this facilitative organization. We are fortunate in the ability to contribute such information, and continue to strive to meet the standards and the needs of those who seek us out as a model for watershed rehabilitative planning and restoration. Sharing includes maintaining active, ongoing lines of communication with the public we serve--through our web site, quarterly newsletter, public presentations and

  2. TIARA annual report 2001

    International Nuclear Information System (INIS)

    Saidoh, Masahiro; Ohara, Yoshihiro; Namba, Hideki

    2002-11-01

    This annual report describes research and development activities which have been performed with the JAERI TIARA (Takasaki Ion Accelerators for Advanced Radiation Application) facilities from April 1, 2001 to March 31, 2002. Summary reports of 109 papers and brief descriptions on the status of TIARA in the period are contained. A list of publications, the type of research collaborations and organization of TIARA are also given as appendices. (author)

  3. Status and trends of the rainbow trout population in the Lees Ferry reach of the Colorado River downstream from Glen Canyon Dam, Arizona, 1991–2009

    Science.gov (United States)

    Makinster, Andrew S.; Persons, William R.; Avery, Luke A.

    2011-01-01

    The Lees Ferry reach of the Colorado River, a 25-kilometer segment of river located immediately downstream from Glen Canyon Dam, has contained a nonnative rainbow trout (Oncorhynchus mykiss) sport fishery since it was first stocked in 1964. The fishery has evolved over time in response to changes in dam operations and fish management. Long-term monitoring of the rainbow trout population downstream of Glen Canyon Dam is an essential component of the Glen Canyon Dam Adaptive Management Program. A standardized sampling design was implemented in 1991 and has changed several times in response to independent, external scientific-review recommendations and budget constraints. Population metrics (catch per unit effort, proportional stock density, and relative condition) were estimated from 1991 to 2009 by combining data collected at fixed sampling sites during this time period and at random sampling sites from 2002 to 2009. The validity of combining population metrics for data collected at fixed and random sites was confirmed by a one-way analysis of variance by fish-length class size. Analysis of the rainbow trout population metrics from 1991 to 2009 showed that the abundance of rainbow trout increased from 1991 to 1997, following implementation of a more steady flow regime, but declined from about 2000 to 2007. Abundance in 2008 and 2009 was high compared to previous years, which was likely the result of increased early survival caused by improved habitat conditions following the 2008 high-flow experiment at Glen Canyon Dam. Proportional stock density declined between 1991 and 2006, reflecting increased natural reproduction and large numbers of small fish in samples. Since 2001, the proportional stock density has been relatively stable. Relative condition varied with size class of rainbow trout but has been relatively stable since 1991 for fish smaller than 152 millimeters (mm), except for a substantial decrease in 2009. Relative condition was more variable for larger

  4. Paddle River Dam : review of probable maximum flood

    Energy Technology Data Exchange (ETDEWEB)

    Clark, D. [UMA Engineering Ltd., Edmonton, AB (Canada); Neill, C.R. [Northwest Hydraulic Consultants Ltd., Edmonton, AB (Canada)

    2008-07-01

    The Paddle River Dam was built in northern Alberta in the mid 1980s for flood control. According to the 1999 Canadian Dam Association (CDA) guidelines, this 35 metre high, zoned earthfill dam with a spillway capacity sized to accommodate a probable maximum flood (PMF) is rated as a very high hazard. At the time of design, it was estimated to have a peak flow rate of 858 centimetres. A review of the PMF in 2002 increased the peak flow rate to 1,890 centimetres. In light of a 2007 revision of the CDA safety guidelines, the PMF was reviewed and the inflow design flood (IDF) was re-evaluated. This paper discussed the levels of uncertainty inherent in PMF determinations and some difficulties encountered with the SSARR hydrologic model and the HEC-RAS hydraulic model in unsteady mode. The paper also presented and discussed the analysis used to determine incremental damages, upon which a new IDF of 840 m{sup 3}/s was recommended. The paper discussed the PMF review, modelling methodology, hydrograph inputs, and incremental damage of floods. It was concluded that the PMF review, involving hydraulic routing through the valley bottom together with reconsideration of the previous runoff modeling provides evidence that the peak reservoir inflow could reasonably be reduced by approximately 20 per cent. 8 refs., 5 tabs., 8 figs.

  5. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  6. Airborne digital-image data for monitoring the Colorado River corridor below Glen Canyon Dam, Arizona, 2009 - Image-mosaic production and comparison with 2002 and 2005 image mosaics

    Science.gov (United States)

    Davis, Philip A.

    2012-01-01

    Airborne digital-image data were collected for the Arizona part of the Colorado River ecosystem below Glen Canyon Dam in 2009. These four-band image data are similar in wavelength band (blue, green, red, and near infrared) and spatial resolution (20 centimeters) to image collections of the river corridor in 2002 and 2005. These periodic image collections are used by the Grand Canyon Monitoring and Research Center (GCMRC) of the U.S. Geological Survey to monitor the effects of Glen Canyon Dam operations on the downstream ecosystem. The 2009 collection used the latest model of the Leica ADS40 airborne digital sensor (the SH52), which uses a single optic for all four bands and collects and stores band radiance in 12-bits, unlike the image sensors that GCMRC used in 2002 and 2005. This study examined the performance of the SH52 sensor, on the basis of the collected image data, and determined that the SH52 sensor provided superior data relative to the previously employed sensors (that is, an early ADS40 model and Zeiss Imaging's Digital Mapping Camera) in terms of band-image registration, dynamic range, saturation, linearity to ground reflectance, and noise level. The 2009 image data were provided as orthorectified segments of each flightline to constrain the size of the image files; each river segment was covered by 5 to 6 overlapping, linear flightlines. Most flightline images for each river segment had some surface-smear defects and some river segments had cloud shadows, but these two conditions did not generally coincide in the majority of the overlapping flightlines for a particular river segment. Therefore, the final image mosaic for the 450-kilometer (km)-long river corridor required careful selection and editing of numerous flightline segments (a total of 513 segments, each 3.2 km long) to minimize surface defects and cloud shadows. The final image mosaic has a total of only 3 km of surface defects. The final image mosaic for the western end of the corridor has

  7. Climate Change Impacts on Water and Energy for Army Installations

    Science.gov (United States)

    2015-09-01

    CO; Houston, TX; Santa Fe, NM, Salt Lake City, UT; Carson City and Los Vegas, NV; and San Fran- cisco , CA (Melillo, Richmond, and Yohe 2014). This...United States, have already affected the Bonneville Power Administration (BPA). BPA markets electric power from the Bonneville Dam located on the...the electricity generated in the Electricity Market Module (EMM) region* and therefore this work’s forecast of the increase in future electricity gen

  8. Dams designed to fail

    Energy Technology Data Exchange (ETDEWEB)

    Penman, A. [Geotechnical Engineering Consultants, Harpenden (United Kingdom)

    2004-09-01

    New developments in geotechnical engineering have led to methods for designing and constructing safe embankment dams. Failed dams can be categorized as those designed to fail, and those that have failed unexpectedly. This presentation outlined 3 dam failures: the 61 m high Malpasset Dam in France in 1959 which killed 421; the 71 m high Baldwin Hills Dam in the United States in 1963 which killed 5; and, the Vajont Dam in Italy in 1963 which killed 2,600 people. Following these incidents, the International Commission for Large Dams (ICOLD) reviewed regulations on reservoir safety. The 3 dams were found to have inadequate spillways and their failures were due to faults in their design. Fuse plug spillways, which address this problem, are designed to fail if an existing spillway proves inadequate. They allow additional discharge to prevent overtopping of the embankment dam. This solution can only be used if there is an adjacent valley to take the additional discharge. Examples of fuse gates were presented along with their effect on dam safety. A research program is currently underway in Norway in which high embankment dams are being studied for overtopping failure and failure due to internal erosion. Internal erosion has been the main reason why dams have failed unexpectedly. To prevent failures, designers suggested the use of a clay blanket placed under the upstream shoulder. However, for dams with soft clay cores, these underblankets could provide a route for a slip surface and that could lead to failure of the upstream shoulder. It was concluded that a safe arrangement for embankment dams includes the use of tipping gates or overturning gates which always fail at a required flood water level. Many have been installed in old and new dams around the world. 14 refs., 19 figs.

  9. Umatilla Hatchery Monitoring and Evaluation, 1999-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Chess, Dale W.; Cameron, William A.; Stonecypher, Jr., R. Wes (Oregon Department of Fish and Wildlife, Salem, OR)

    2003-12-01

    Umatilla River at Three Mile Dam and South Fork Walla Walla adult facilities for salmon; steelhead adults were monitored at Minthorn adult facility. A new addition to this year's report is the effort to bring together an overview of fish health monitoring results including historical and year to date pathogen information. This information is in table form (Appendix Tables A-28, A-29 and A-30). A summary of juvenile disease outbreaks at Umatilla Hatchery is also included (Appendix Table A-31). REPORT C: Fish Health Monitoring and Evaluation, 2001 Fiscal Year--Results from the 2001 annual report cover the 10th year of Fish Health Monitoring in the Umatilla Hatchery program. Efforts were again made to provide up to date fish health and juvenile disease outbreak loss summary tables from the beginning of the Umatilla Hatchery program (Appendix Tables A-27, A-28, A-29 and A-30). Outmigrant Fish Health Monitoring results were included in this report since this was part of the fish health work statement for this report period. The discussion section for the 2001 and 2002 annual reports are combined in the 2002 report due to time constraints and consolidation efforts to complete this report by the end of May 2003.

  10. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  11. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  12. Umatilla Basin Natural Production Monitoring and Evaluation; 1998-2002 Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-07-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME). Chapter One provides an overview of the entire report and shows how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. This chapter also provides background information relevant to the aquatic resources of the Umatilla River Basin. (Figure 1-1, Tables 1-1 and 1-2). Data and reports from this and previous efforts are available on the CTUIR website http://www.umatilla.nsn.us. This project was one of several subprojects of the Umatilla River Basin Fisheries Restoration Master Plan (CTUIR 1984, ODFW 1986) orchestrated to rehabilitate salmon and steelhead runs in the Umatilla River Basin. Subprojects in additions to this project include: Watershed Enhancement and Rehabilitation; Hatchery Construction and Operation; Hatchery Monitoring and Evaluation; Satellite Facility Construction and Operations for Juvenile Acclimation and Adult Holding and Spawning; Fish Passage Construction and Operation; Juvenile and Adult Passage Facility Evaluations; Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin, and Flow Augmentation to Increase Stream Flows below Irrigation Diversions.

  13. Teste de Papanicolaou: cobertura em dois inquéritos domiciliários realizados no município de São Paulo em 1987 e em 2001-2002 Papanicolaou smear screening: coverage in two home surveys applied in the city of São Paulo in 1987 and 2001-2002

    Directory of Open Access Journals (Sweden)

    Carolina Ozawa

    2011-05-01

    Full Text Available OBJETIVO: comparar a cobertura da citologia convencional de Papanicolaou em mulheres de 15 a 59 anos entre dois inquéritos domiciliários, relacionando a alguns atributos pessoais e à tendência da mortalidade por câncer de colo do útero. MÉTODOS: analisou-se os dados coletados por meio de dois inquéritos domiciliários, com amostragem complexa, realizados no município de São Paulo nos anos de 1987 e 2001 a 2002. Foram comparadas as respostas autorreferidas de 968 mulheres no primeiro inquérito e 1.125 mulheres no segundo inquérito, na resposta à pergunta sobre a realização "alguma vez na vida" do teste de Papanicolaou, relacionando com faixa etária, cor da pele, situação conjugal, escolaridade e tendência da mortalidade por câncer de colo no período de 1980 a 2007. Foi aplicado o teste exato de Fisher em cada uma das comparações entre as amostras, consideradas como devidas ao acaso as diferenças que ocorreram com probabilidade p>5%. RESULTADOS: do primeiro inquérito para o segundo houve aumento de 24% na realização da citologia convencional de Papanicolaou (de 68,8% para 85%. As maiores variações do aumento de cobertura relacionadas com atributos pessoais das mulheres foram encontradas nas de cor da pele preta, solteiras e de nível de escolaridade mais baixo. Quanto à tendência nas taxas de mortalidade por câncer de colo, não se observou nítida disposição de ascensão e nem de declínio ao longo dos 28 anos estudados (1980 a 2007. CONCLUSÃO: houve aumento no acesso ao exame citológico de Papanicolaou nas mulheres mais vulneráveis. Desde 2001 e 2002, a cobertura de 85% já atingia a recomendação da Organização Mundial da Saúde (OMS, porém sem nítida tendência de declínio nas taxas de mortalidade por câncer de colo nos anos seguintes, indicando que o rastreamento é apenas parte de um programa efetivo e organizado para o controle do câncer do colo, cujo modelo deve garantir a integralidade da aten

  14. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  15. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H. [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  16. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  17. Bonneville Power Administration 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  18. Annual report 2001. General direction of energy and raw materials; Rapport annuel 2001. Direction generale de l'energie et des matieres premieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  19. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are

  20. Belgium; Staff Report for the 2001 Article IV Consultation

    OpenAIRE

    International Monetary Fund

    2002-01-01

    This 2001 Article IV Consultation highlights that following four years of robust expansion, real GDP growth in Belgium slowed markedly in 2001, as higher oil prices, declining equity values, and the deteriorating external environment adversely affected business investment, household consumption, and exports. The outlook for 2002 depends critically on a recovery in the world economy and, especially, in Belgium’s key European trading partners. Growth for the year is projected by the IMF staff a...

  1. Tucannon River Spring Chinook Salmon Captive Broodstock Program, Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Gallinat, Michael P.; Bumgarner, Joseph D.

    2002-05-01

    This report summarizes the objectives, tasks, and accomplishments of the Tucannon River spring chinook captive brood during 2001. The WDFW initiated a captive broodstock program in 1997. The overall goal of the Tucannon River captive broodstock program is for the short-term, and eventually long-term, rebuilding of the Tucannon River spring chinook salmon run, with the hope that natural production will sustain itself. The project goal is to rear captive salmon selected from the supplementation program to adults, spawn them, rear their progeny, and release approximately 150,000 smolts annually into the Tucannon River between 2003-2007. These smolt releases, in combination with the current hatchery supplementation program (132,000 smolts) and wild production, are expected to produce 600-700 returning adult spring chinook to the Tucannon River each year from 2005-2010. The captive broodstock program will collect fish from five (1997-2001) brood years (BY). The captive broodstock program was initiated with 1997 BY juveniles, and the 2001 BY fish have been selected. As of Jan 1, 2002, WDFW has 17 BY 1997, 159 BY 1998, 316 BY 1999, 448 BY 2000, and approximately 1,200 BY 2001 fish on hand at LFH. The 2001 eggtake from the 1997 brood year (Age 4) was 233,894 eggs from 125 ripe females. Egg survival was 69%. Mean fecundity based on the 105 fully spawned females was 1,990 eggs/female. The 2001 eggtake from the 1998 brood year (Age 3) was 47,409 eggs from 41 ripe females. Egg survival was 81%. Mean fecundity based on the 39 fully spawned females was 1,160 eggs/female. The total 2001 eggtake from the captive brood program was 281,303 eggs. As of May 1, 2002 we have 171,495 BY 2001 captive brood progeny on hand. A total of 20,592 excess fish were marked as parr (AD/CWT) and will be released during early May, 2002 into the Tucannon River (rkm 40-45). This will allow us to stay within our maximum allowed number (150,000) of smolts released. During April 2002, WDFW volitionally

  2. Re-Introduction of Lower Columbia River Chum Salmon into Duncan Creek, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hillson, Todd D. (Washington Department of Wildlife, Olympia, WA)

    2002-10-01

    The National Marine Fisheries Service (NMFS) listed Lower Columbia River chum as threatened under the auspices of the Endangered Species Act (ESA) in March of 1999 (64 FR 14508, March 25, 1999). The listing was in response to reduction in abundance from historical levels of more than half a million returning adults to fewer than 10,000 spawners present day (Johnson et al. 1997). Harvest, loss of habitat, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for the decline in this species in the Columbia River. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of chum salmon (Johnson et al. 1997). This is especially true of the population located directly below Bonneville Dam where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. The recovery strategy for Lower Columbia River chum as outlined in the Hatchery Genetic Management Plan (HGMP) for the Grays River project has four main tasks. First, determine if remnant populations of Lower Columbia River chum salmon exist in Lower Columbia River tributaries. Second, if such populations exist, develop stock-specific recovery plans that would involve habitat restoration including the creation of spawning refugias, supplementation if necessary and a habitat and fish monitoring and evaluation plan. If chum have been extirpated from previously utilized streams, develop re-introduction plans that utilize appropriate genetic donor stock(s) of Lower Columbia River chum salmon and integrate habitat improvement and fry-to-adult survival evaluations. Third, reduce the extinction risk to Grays River chum salmon population by randomly capturing adults in the basin for use in a supplementation program and reintroduction of Lower Columbia River chum salmon into the Chinook River basin. The

  3. Análise do custo de produção e lucratividade na cultura de pinha (Annona squamosa L. na região de Jales-SP, ano agrícola 2001-2002 Production costs and profitability analyze for the anona (Annona squamosa L. in Jales region, São Paulo State, 2001-2002

    Directory of Open Access Journals (Sweden)

    Gilberto José Batista Pelinson

    2005-08-01

    Full Text Available Este trabalho foi realizado na região de Jales-SP, com objetivo de analisar economicamente o cultivo da pinha. Para estimar a matriz de coeficientes técnicos, os custos de produção, os indicadores de lucratividade e os dados foram levantados com cinco produtores de pinha, no ano de 2001-2002. Apesar do custo superior do sistema de produção tecnificado quando comparado com o convencional na cultura da pinha, o sistema tecnificado apresentou-se mais rentável para os produtores rurais da região de Jales, com um lucro operacional por hectare de R$5.301,07 (US$2.031,06 e para o convencional de R$1.720,48 (US$659,19. Isto se deve principalmente por proporcionar benefícios, como antecipação da colheita para períodos de melhores preços, melhoria na qualidade e na quantidade dos frutos.This work was conduced in Jales region, São Paulo State, Brazil, intending to analyze economically the Anona (Annona squamosa L. crops cultivation. For the technical matrix coefficients, the production costs and the profitability indicators data were collected in 5 (five farmers which produced sugar apple in 2001/2002 harvest. Besides the cost of the intensive production system being higher than the conventional one, the intensive production system showed better profitability to the sugar apple farmers in Jales region with an operational profit per hectare of US$ 2,031.06 while the conventional was of US$ 659.19. The reason of this difference is related with the benefits such as harvest anticipation to a better prices period, increase in the fruits quantity and quality.

  4. Gaz Metropolitain 2002 report : connecting with the future

    International Nuclear Information System (INIS)

    2003-01-01

    Gaz Metropolitain is the major natural gas distributor in Quebec. In 2002, the utility had its best year ever in terms of Partners' income of $154.6 million, representing a 9.5 per cent increase from 2001. Income from its core business, the distribution of natural gas in Quebec and Vermont, was $7.5 million higher than in 2001. This increase in income was due in part to better transportation and load balancing transactions. The main business effort in 2002 was on cogeneration plant projects developed with Boralex and Hydro Quebec. The projects, however, were not retained. This annual report presented consolidated financial and operating data for the distribution and transmission sectors of the company. It included information about Gaz Metropolitain's customers, the transmission and supply system, mission objectives, partnerships, corporate structure, and the year in review. The consolidated financial statements included income and cash flows, consolidated normalized volumes, and consolidated balance sheets. Revenue and expenditure statements were summarized by source. tabs., figs

  5. Shillapoo Wildlife Area 2007 Follow-up HEP Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-03-01

    In April and May 2007 the Regional HEP Team (RHT) conducted a follow-up HEP analysis on the Egger (612 acres) and Herzog (210 acres) parcels located at the north end of the Shillapoo Wildlife Area. The Egger and Herzog parcels have been managed with Bonneville Power Administration funds since acquired in 1998 and 2001 respectively. Slightly more than 936 habitat units (936.47) or 1.14 HUs per acre was generated as an outcome of the 2007 follow-up HEP surveys. Results included 1.65 black-capped chickadee HUs, 280.57 great blue heron HUs, 581.45 Canada goose HUs, 40 mallard HUs, and 32.80 mink HUs. Introduction A follow-up Habitat Evaluation Procedures (HEP) (USFWS 1980) analysis was conducted by the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) during April and May 2007 to document changes in habitat quality and to determine the number of habitat units (HUs) to credit Bonneville Power Administration (BPA) for providing operation and maintenance (O&M) funds since WDFW acquired the parcels. The 2007 follow-up HEP evaluation was limited to Shillapoo Wildlife Area (SWA) parcels purchased with Bonneville Power Administration funds. D. Budd (pers. comm.) reported WDFW purchased the 612 acre Egger Farms parcel on November 2, 1998 for $1,737,0001 and the 210 acre Herzog acquisition on June 21, 2001 for $500,000 with Memorandum of Agreement funds (BPA and WDFW 1996) as partial fulfillment of BPA's wildlife mitigation obligation for construction of Bonneville and John Day Dams (Rasmussen and Wright 1989). Anticipating the eventual acquisition of the Egger and Herzog properties, WDFW conducted HEP surveys on these lands in 1994 to determine the potential number of habitat units to be credited to BPA. As a result, HEP surveys and habitat unit calculations were completed as much as seven years prior to acquiring the sites. The term 'Shillapoo Wildlife Area' will be used to describe only the Herzog and Egger parcels in this

  6. Annual report 2001. General direction of energy and raw materials; Rapport annuel 2001. Direction generale de l'energie et des matieres premieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  7. MANAGEMENT BOARD MEETING OF 24 OCTOBER 2002

    CERN Multimedia

    2002-01-01

    Outcome of the Meeting of TREF on 23 October 2002 The Director of Administration, J. van der Boon, reported that at its meeting the previous day the Tripartite Employment Conditions Forum (TREF) had examined an information document on the adjustment of the scale of basic salaries for 2003 and a proposal for the 2003 adjustment of pensions. It had taken note that, in accordance with the revised formula adopted during the last five-yearly review, the calculated salary index applicable with effect from 1st January 2003 amounted to 1.2%, taking account of the Geneva cost-of-living movement for the twelve-month period beginning August 2001 and of the average movements of real net salaries of the Swiss Federal civil servants and the civil servants of nine other Member States from June 2001 to June 2002. Given that the majority of TREF members had been in favour of applying the calculated 1.2% salary adjustment index, a formal proposal to that effect would be submitted to the Finance Committee in November in the fra...

  8. After Three Gorges Dam: What have we learned?

    Science.gov (United States)

    Natali, J.; Williams, P.; Wong, R.; Kondolf, G. M.

    2013-12-01

    China is at a critical point in its development path. By investing heavily in large-scale infrastructure, the rewards of economic growth weigh against long-term environmental and social costs. The construction of Three Gorges Dam, the world's largest hydroelectric project, began in 1994. Between 2002 and 2010, its 660 kilometer reservoir filled behind a 181 meter dam, displacing at least 1.4 million people and transforming Asia's longest river (the Yangtze) while generating nearly 100 billion kWh/yr of electricity -- 2.85% of China's current electric power usage. As the mega-project progenitor in a cascade of planned dams, the Three Gorges Dam emerges as a test case for how China will plan, execute and mitigate its development pathway and the transformation of its environment. Post-Project Assessments (PPA) provide a systematic, scientific method for improving the practice of environmental management - particularly as they apply to human intervention in river systems. In 2012, the Department of Landscape Architecture and Environmental Planning at University of California, Berkeley organized a symposium-based PPA for the Three Gorges Dam on the Yangtze River. Prior to this symposium, the twelve invited Chinese scientists, engineers and economists with recent research on Three Gorges Dam had not had the opportunity to present their evaluations together in an open, public forum. With a 50-year planning horizon, the symposium's five sessions centered on impacts on flows, geomorphology, geologic hazards, the environment and socioeconomic effects. Three Gorges' project goals focused on flood control, hydropower and improved navigation. According to expert research, major changes in sediment budget and flow regime from reservoir operation have significantly reduced sediment discharge into the downstream river and estuary, initiating a series of geomorphic changes with ecological and social impacts. While the dam reduces high flow stages from floods originating above the

  9. Teton Dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Snorteland, N. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case summary discussed an internal erosion failure that occurred at the embankment foundation of Teton Dam. The project was designed as a run-of-the-river power generation facility and to provide irrigation, flood protection, and power generation to the lower Teton region of southern Idaho. The dam site was located next to the eastern Snake River plain, a volcanic filled depression. The foundation's cutoff trench was excavated into the bedrock along the length of the dam. The dam was designed as a zoned earthfill with a height of 305 feet. A trench made of low plasticity windblown silt was designed to connect the embankment core to the rock foundation. Seeps were noted in 1976, and a leak was observed near the toe of the dam. A wet spot appeared on the downstream face of the dam at elevation 5200. A sinkhole then developed. The embankment crest collapsed, and the dam breached. Peak outflow was estimated at 1,000,000 cfs. The failure was attributed to a lack of communication between designers, a failure to understand geologic information about the region, and an insufficient review of designs and specifications by designers and field personnel. No monitoring instrumentation was installed in the embankment. Approximately 300 square miles were inundated, and 25,000 people were displaced. Eleven people were killed. A review group noted that the rock surface was not adequately sealed, and that the dam failed as a result of inadequate protection of the impervious core material from internal erosion. 42 figs.

  10. How big of an effect do small dams have? Using geomorphological footprints to quantify spatial impact of low-head dams and identify patterns of across-dam variation

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  11. Sulphur in liquid fuels 2002

    Energy Technology Data Exchange (ETDEWEB)

    Guthrie, J. [Environment Canada, Gatineau, PQ (Canada). Fuels Div., Oil, Gas and Energy Branch ; Sabourin, R. [Carleton Univ., Ottawa, ON (Canada)

    2003-08-01

    Environment Canada has developed new regulations for sulphur content in fuels in an effort to align with requirements recently passed by the U.S. Environmental Protection Agency. This report summarizes data regarding sulphur content in liquid fuels for the year 2002. The requirements of the Sulphur in Gasoline Regulation came into effect in 2002, limiting the average sulphur content of gasoline to 150 mg/kg. In January 2005, a 30 mg/kg average limit will come into effect. Also, in July 2002, the Sulphur in Diesel Fuel Regulation stipulated a maximum limit of 500 mg/kg for on-road diesel fuel. The new regulation continues this limit until mid-2006 at which time a 15 mg/kg limit will come into effect for on-road diesel fuel. Nationally, the average sulphur content in gasoline in 2002 was 246 mg/kg, which was 14.3 per cent lower than in 2001. The data covers the period from January 1 to December 31, 2002 and was obtained from petroleum refineries and importing companies that are required to submit quarterly information to the regional office of Environment Canada. Failure to comply results in penalties. The report includes data for aviation turbo fuel, motor gasoline, aviation gasoline, kerosene oil, low-sulphur diesel fuel, diesel fuel, light fuel oil, and heavy fuel oil. 16 tabs., 17 figs., 7 appendices.

  12. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  13. Mechanics of slide dams

    Energy Technology Data Exchange (ETDEWEB)

    Young, G A [Engineering, Agbabian-Jacobsen Associates, Los Angeles (United States)

    1970-05-15

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  14. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  15. A Review of the Large-and-Medium Bus Market in 2001 and A Forecast in 2002

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    <正> 1. A Review of the Large-and-Medium Bus Market in 2001 1.1 The Overall Auto Production and Sales Situation in 2001 The auto production and sales in 2001 maintained a momentum of double-digits growth in consecutive three years and the pace will further increase in the future. In 2001, 103 automakers (including complete vehicles and chassis enterprises, not including retrofit vehicle enterprises) produced 2,334,440 vehicles, an increase of 12.81% over 2000, sold 2,363,665 units, 13.29 % up over 2000.

  16. Effects of roads and well pads on erosion in the Largo Canyon watershed, New Mexico, 2001-02

    Science.gov (United States)

    Matherne, Anne Marie

    2006-01-01

    Largo Canyon, located in the San Juan Basin of northwestern New Mexico, is one of the longest dry washes in the world. Oil and gas production in the San Juan Basin, which began in the 1940's, required the development of an extensive network of dirt roads to service the oil and gas wells in the Navajo Reservoir area. Presently, there are about eight wells per square mile, and the density of oil and gas wells is expected to increase. Potential environmental effects on landscape stability that may result from the additional roads and well pads have not been documented. In 2001, the U.S. Geological Survey began a study in cooperation with the Bureau of Land Management to evaluate the effects of roads and well pads associated with oil and gas operations on the erosion potential of Bureau of Land Management lands in the Largo Canyon watershed. The effects of roads and well pads on erosion were quantified by installing sediment dams (dams) and by surveying transects across roads and well pads. Data from 26 dams were used in the analysis. Dams were installed at 43 sites: 21 on hillsides upslope from roads or pads to measure erosion from hillslopes, 11 at the downslope edges of roads to measure erosion from roads, and 11 at the downslope edges of well pads to measure erosion from well pads. Pairs of survey transects were established at nine well pads and two road locations. Sediment-accumulation data for 26 dams, recorded at 17 measurement intervals, indicate that average erosion rates at the dams significantly correlate to size of the contributing area. The average erosion rate normalized by drainage area was 0.001 foot per year below roads, 0.003 foot per year on hillslopes, and 0.011 foot per year below well pads. Results of a two-sample t-test indicate that there was no significant difference in average erosion rates for dams located on hillslopes and below roads, whereas average erosion rates were significantly greater for dams below well pads than for dams on

  17. Dossier of the observatory workshops of April 10, 2002; Dossier des ateliers de l'Observatoire du 10 avril 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-04-01

    The workshops organized by the French observatory of indoor air quality on April 10, 2002 aimed at making a status of the lessons learnt from the pilot study carried out during 2001 by the observatory on 90 residential buildings and 9 schools. This document summarizes the preliminary results obtained during this study and presents the 2002-2003 operational campaign of investigation which will be carried out on 800 sites (accommodations and schools). The pilot study has permitted to perform a first adjustment of the measurement means and has demonstrated the feasibility of the future large-scale campaign. (J.S.)

  18. Investigations into the Early Life-history of Naturally Produced Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Basin, Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Reischauer, Alyssa; Monzyk, Frederick; Van Dyke, Erick

    2003-06-01

    approximately 14% of these fish leaving as early migrants. Juvenile spring chinook salmon PIT-tagged at trap sites in the fall and in upper rearing areas during winter were used to compare migration timing and survival to Lower Granite Dam of the early and late migrant groups. Juvenile spring chinook tagged on the upper Grande Ronde River were detected at Lower Granite Dam from 4 May to 20 May 2001, with a median passage date of 17 May. Too few fish were collected and tagged to conduct detection rate and survival comparisons between migrant groups. PIT-tagged salmon from Catherine Creek trap were detected at Lower Granite Dam from 27 April to 13 July 2001. Early migrants were detected significantly earlier (median = 10 May) than late migrants (median = 1 June). Also, early migrants from Catherine Creek were detected at a significantly higher rate than fish tagged in upper rearing areas in the winter, suggesting better survival for fish that migrated out of upper rearing areas in the fall. Juvenile spring chinook salmon from the Lostine River were detected at Lower Granite Dam from 2 April through 4 July 2001. Early migrants were detected significantly earlier (median = 27 April) than late migrants (median = 14 May). However, there was no difference in detection rates between early and late migrants. Survival probabilities showed similar patterns as dam detection rates. Juvenile spring chinook salmon from the Minam River were detected at Lower Granite Dam from 8 April through 18 August 2001. Early migrants were detected significantly earlier (median = 28 April) than late migrants (median = 14 May). Late migrants from the Minam River were tagged at the trap in the spring. Spring chinook salmon parr PIT-tagged in summer 2000 on Catherine Creek and the Imnaha, Lostine, and Minam rivers were detected at Lower Granite Dam over an 87 d period from 8 April to 3 July 2001. The migratory period of individual populations ranged from 51 d (Imnaha River) to 67 d (Catherine Creek) in length

  19. From lab to field: Geotechnical properties for predicting embankment settlement on Lake Bonneville deposits

    International Nuclear Information System (INIS)

    Hoagland, K.C.; Sampaco, C.L.; Anderson, L.R.; Caliendo, J.A.; Rausher, L.; Keane, E.

    1994-01-01

    The results of a laboratory analysis, to determine geotechnical properties of lacustrine Lake Bonneville deposits, within the I-15 corridor of Salt Lake City, Utah, is presented. Laboratory vertical and horizontal consolidation coefficients are compared with those back-calculated from observed, field settlement data and linear relationships established. The results are used to select vertical and horizontal field coefficients and predict settlement rate of an existing embankment, scheduled for enlargement. 27 refs., 9 figs

  20. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the

  1. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  2. Status report of seabird surveys at Horns Rev, 2000-2001

    International Nuclear Information System (INIS)

    Kjaer Christensen, T.; Clausager, I.; Krag Petersen, I.

    2002-01-01

    The present report presents the results of three bird surveys conducted in the Horns Rev area during the second half of 2001. Due to poor weather conditions in December 2001, the last survey was, however, performed on 7 January 2002. The surveys are part of the base-line investigations of birds performed in relation to the proposed construction of an offshore wind farm at Horns Rev in the Danish part of the North Sea ca 14 km southwest of Blaevandshuk. The results of the surveys during August 2001 - January 2002 are presented together with the results obtained during the period August 2000 - April 2001, and are also compared to results obtained during the period August 1999 - April 2000. Based on the distribution of the most abundant bird species recorded during 16 aerial surveys performed during August 1999 - January 2002, there were no indications that the wind farm area was of any particular importance to the birds' exploitation of the Horns Rev area. Fish-eating species like divers, gannet, terns, auks and gulls generally showed scattered and variable distributions, mainly occurring in the areas north and south of Horns Rev, and with low numbers on the reef proper and within the planned wind farm area. The distribution of benthic foraging species, eider and common Scoter, showed that they mainly exploited the coastal parts of the area off Blaevandshuk and Skallingen, although common scoter was found in relatively high numbers on the southeast slopes of the Horns Rev and within the wind farm area in the April 2001 survey. Common scoters occurred in very high numbers in January 2002. This was probably related to increased immigration of birds from the inner Danish waters during a cold period in late December 2001. Preference analyses of bird exploitation of the Horns Rev area showed that if the birds completely avoid the wind farm area after erection of the wind turbines, this will affect less than 1% of the various species, except divers where 1.58% will be

  3. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  4. Application of BET_EF at Mount Etna: a retrospective analysis (years 2001-2005

    Directory of Open Access Journals (Sweden)

    Jacopo Selva

    2011-12-01

    Full Text Available Advances in volcano monitoring and forecasting need a multidisciplinary collaborative framework. In light of this, a Bayesian Event Tree (BET approach was performed by the application of the BET for Eruption Forecasting (BET_EF code to analyze the space-time distribution of the volcanic activity of Mount Etna from 2001-2005. First, a reliable monitoring dataset was set up after some sessions to elicit geophysical, volcanological and geochemical ‘precursor’ parameters. A constant unrest probability of 100%, with a magma involvement usually greater than 95%, was computed throughout the time period analyzed. Eruption probabilities higher than 90% were estimated a few days before the onsets of the 2001 and 2002-2003 flank eruptions. Values slightly higher than 75% were observed during the lava fountaining period in June-July 2001. However, the probabilities flattened to around 30% for the 2004-2005 flank eruption. With suitable data, a good depiction of the actual location of the eruptive scenario for the 2001 and 2002-2003 events was provided. Conversely, the size of the eruptions was not indicated.

  5. Estimating changes in riparian and channel features along the Trinity River downstream of Lewiston Dam, California, 1980 to 2011

    Science.gov (United States)

    Curtis, Jennifer A.

    2015-01-01

    Dam construction, flow diversion, and legacy landuse effects reduced the transport capacity, sediment supply, channel complexity and floodplain-connectivity along the Trinity River, CA below Lewiston Dam. This study documents the geomorphic evolution of the Trinity River Restoration Program’s intensively managed 65-km long restoration reach from 1980 to 2011. The nature and extent of riparian and channel changes were assessed using a series of geomorphic feature maps constructed from ortho-rectified photography acquired at low flow conditions in 1980, 1997, 2001, 2006, 2009, and 2011. Since 1980 there has been a general conversion of riparian to channel features and expansion of the active channel area. The primary mechanism for expansion of the active channel was bank erosion from 1980 to 1997 and channel widening was well distributed longitudinally throughout the study reach. Subsequent net bar accretion from 1997 to 2001, followed by slightly higher net bar scour from 2001 to 2006, occurred primarily in the central and lower reaches of the study area. In comparison, post-2006 bank and bar changes were spatially-limited to reaches with sufficient local transport capacity or sediment supply supported by gravel augmentation, mechanical channel rehabilitation, and tributary contributions to flow and sediment supply. A series of tributary floods in 1997, 1998 and 2006 were the primary factors leading to documented increases in channel complexity and floodplain connectivity. During the post-2006 period managed flow releases, in the absence of large magnitude tributary flooding, combined with gravel augmentation and mechanical restoration caused localized increases in sediment supply and transport capacity leading to smaller but measurable increases in channel complexity and floodplain connectivity primarily in the upper river below Lewiston Dam.

  6. Annual report 2001. General direction of energy and raw materials

    International Nuclear Information System (INIS)

    2001-01-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  7. Investigation of geophysical methods for assessing seepage and internal erosion in embankment dams : a study of through-dam seismic testing at WAC Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Gaffran, P.; Jeffries, M. [BC Hydro, Burnaby, BC (Canada)

    2005-07-15

    Crosshole tomography is used to establish the distribution of seismic velocity between drill holes. The through-dam mode takes advantage of the triangular cross-section of earth embankments, obviating the need for drill holes. Seismic energy, generated on one face of the dam, passes underneath the crest and is detected by sensors arrayed on the opposite face. The sinkholes discovered at WAC Bennett Dam in 1996 provided an opportunity to test the procedure. Using p-wave energy, two series of measurements were conducted, notably one immediately before remediation of one sinkhole, and a second one shortly after the sinkhole was repaired. The known defect was successfully imaged by the first round of measurements. This report presented the results of an investigation of the through-dam seismic method using propagation of seismic waves through a dam from upstream to downstream, or vice-versa. The purpose of the study was to determine if this procedure could characterize the distribution of seismic velocity within a dam in an accurate and cost effective manner. The report presented the methods of velocity testing such as crosshole and downhole, and tomography; and through-dam measurements. Background to the Bennett Dam studies was also provided, with particular reference to the Bennett Dam sinkholes; sinkhole investigations; working hypothesis for sinkhole development; sinkhole number one characterization; and sinkhole remediation. An analysis of compression wave testing at Bennett Dam and shear wave testing was then offered. Other topics that were discussed included field test procedures; methodologies for data processing; p-waves versus s-waves; applicability of the research; and costs of through-dam surveys. It was concluded that under the right circumstances, through-dam seismic testing was capable of detecting changed conditions in an embankment dam. 15 refs., 2 tabs., 41 figs., 1 appendix.

  8. Annual report of department of research reactors, 2001. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-12-01

    The Department of Research Reactor is responsible for the operation, maintenance, utilization of the JRR-3 and the JRR-4 and for the related R and D. Besides RI production including its R and D are carried out. This report describes the activities of the department in fiscal year of 2001 and it also includes some of the technical topics on the works mentioned above. As for the research reactors, we carried out the operation, maintenance, the utilization of irradiation and neutron beam experiments, technical management including fuels and water chemistry, radiation monitoring as related R and D works. RI production and its R and D works were conducted as well. The international cooperations between the developing countries and the department were also made concerning the operation, utilization and safety analysis for research reactors. (author)

  9. Turbulence investigation and reproduction for assisting downstream migrating juvenile salmonids, Part II of II: Effects of induced turbulence on behavior of juvenile salmon, 2001-2005 final report

    Science.gov (United States)

    Perry, R.; Farley , M.; Hansen, G.; Morse , J.; Rondorf, D.

    2005-01-01

    Passage through dams is a major source of mortality of anadromous juvenile salmonids because some populations must negotiate up to eight dams in Columbia and Snake rivers. Dams cause direct mortality when fish pass through turbines, but dams may also cause indirect mortality by altering migration conditions in rivers. Forebays immediately upstream of dams have decreased the water velocity of rivers and may contribute substantially to the total migration delay of juvenile salmonids. Recently, Coutant (2001a) suggested that in addition to low water velocities, lack of natural turbulence may contribute to migration delay by causing fish to lose directional cues. Coutant (2001a) further hypothesized that restoring turbulence in dam forebays may reduce migration delay by providing directional cues that allow fish to find passage routes more quickly (Coutant 2001a). Although field experiments have yielded proof of the concept of using induced turbulence to guide fish to safe passage routes, little is known about mechanisms actually causing behavioral changes. To test hypotheses about how turbulence influences movement and behavior of migrating juvenile salmonids, we conducted two types of controlled experiments at Cowlitz Falls Dam, Washington. A common measure of migration delay is the elapsed time between arrival at, and passage through, a dam. Therefore, for the first set of experiments, we tested the effect of induced turbulence on the elapsed time needed for fish to traverse through a raceway and pass over a weir at its downstream end (time trial experiment). If turbulence helps guide fish to passage routes, then fish should pass through the raceway quicker in the presence of appropriately scaled and directed turbulent cues. Second, little is known about how the physical properties of water movement provide directional cues to migrating juvenile salmonids. To examine the feasibility of guiding fish with turbulence, we tested whether directed turbulence could guide

  10. Dworshak Reservoir Kokanee Population Monitoring, Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Maiolie, Melo; Stark, Eric

    2003-03-01

    Onsite testing of strobe lights was conducted to determine if they repelled kokanee Oncorhynchus nerka away from the turbine intakes at Dworshak Dam. We tested a set of nine strobe lights flashing at a rate of 360 flashes/min placed near the intake of a 90 mW turbine. A split-beam echo sounder was used to determine the effect of strobe light operation on fish density (thought to be mostly kokanee) in front of the turbine intakes. On five nights between December 2001 and January 2002, fish density averaged 110 fish/ha when no lights were flashing. Mean density dropped to 13 fish/ha when the strobe lights were turned on during five additional nights of sampling. This 88% decline in density was significant at the P = 0.009 level of significance based on a paired Student's t test. There appeared to be no tendency for fish to habituate to the lights during the night. Test results indicate that a single set of nine lights may be sufficient to repel kokanee from a turbine intake during the night. We also used split-beam hydroacoustics to monitor the kokanee population in Dworshak Reservoir during 2001. Estimated abundance of kokanee has continued to increase since the spring of 1996 when high entrainment losses occurred. Based on hydroacoustic surveys, we estimated 3,276,000 kokanee in Dworshak Reservoir in early July 2001. This included 2,069,000 age-0 kokanee (90% CI {+-} 16.4%), 801,000 age-1 kokanee (90% CI {+-} 17.8%), and 406,000 age-2 kokanee (90% CI {+-} 20.5%). Entrainment sampling was also conducted with split-beam hydroacoustics a minimum of one continuous 24 h period per month. The highest entrainment rates occurred at night with lower discharges and shallower intake depths. Fish movement patterns suggested that they swam 'at will' in front of the intakes and may have chosen to move into the turbine intakes. Based on monthly hydroacoustic sampling in the forebay, we found that kokanee density was low in July and August during a period of high

  11. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  12. International wind energy development. World market update 2002. Forecast 2003-2007

    International Nuclear Information System (INIS)

    2003-03-01

    This report highlights the development of the international wind power market during 2002 and the new forecast up to 2007. The data presented includes both supply side and demand side information. With 7,227 MW of new installations the total installed capacity of wind power grew to over 32,000 MW. This is the highest figure ever in a single year. The growth rate of 6% over 2001, however, was the lowest since 1996. In spite of this modest figure, the average growth rate over the past five years (from 1997) has been much higher, at 35.7%, and last year's record growth (2001 over 2000) was 52%. The key features of development during 2002 were: 7,227 MW new installed wind power; cumulative installed capacity by the end of 2002 had reached 32,037 MW, consisting of around 61,500 wind turbines dispersed over more than 40 countries; A major share of new installations took place in Europe, with 85.4% of the total. Germany accounted for 53% of the European total; America fell back form its peak level of 1,745 MW in 2001 to a modest 494 MW in 2002, with the majority installed in the USA; Development in Asia was lower than in 2001; Of the emerging markets in the Far East/Pacific, China and Australia were the only two markets to show growth over 2001; The Top Ten markets in the world are headed by Germany, Spain, Denmark and the USA. Newcomers to the Top Ten markets ranking were Australia and the Netherlands; In terms of cumulative installation, the German market passed the 10,000 MW milestone and is by far the largest market in the world. There were 12,000 MW installed in Germany by end of 2002. Spain became No. 2 with 5,042 MW; Penetration of wind power in the world's electricity supply had reached 0.4% by end of 2002. Ten of the world's roughly 25 suppliers of wind turbines are responsible for more than 90% of total supply in the global market. This trend is continuing, with the Top Ten manufacturers in 2002 delivering 95% of the total record installation. Vestas Wind

  13. Pacific Northern Gas Ltd. annual report 2002

    International Nuclear Information System (INIS)

    2003-01-01

    Pacific Northern Gas Ltd. operates in west-central and northeast British Columbia. The company delivers natural gas to customers through a transmission pipeline connected to Duke Energy system near Summit Lake, British Columbia. This report states that in 2002 financial results were disappointing. The company's net income in 2002 was lower than it was in 2001 ($4.6 million versus $5.7 million). In December 2002, Pacific Northern Gas Ltd. completed $15 million in financing. Additions to property, plant and equipment reached a total of $6 million in 2002. A new, seven-year contract with Methanex Corporation was successfully negotiated. Pacific Northern Gas Ltd. filed revenue requirements applications with the British Columbia Utilities Commission, seeking the Commission's approval of rates for 2003 and requesting approval of a new deferral account in all divisions. A settlement of the western system 2003 revenue requirements application was negotiated with its customers. The annual report presented a highlight of all activities, including corporate governance and management discussions and analysis. Consolidated financial statements were also provided. tabs

  14. Aerial Measuring System Technical Integration Annual Report 2002

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada Remote Sensing Laboratory

    2003-06-01

    Fiscal Year 2002 is the second year of a five-year commitment by the U.S. Department of Energy, National Nuclear Security Administration (NNSA) to invest in development of new and state-of-the-art technologies for the Aerial Measuring Systems (AMS) project. In 2000, NNSA committed to two million dollars for AMS Technical Integration (TI) for each of five years. The tragedy of September 11, 2001, profoundly influenced the program. NNSA redirected people and funding resources at the Remote Sensing Laboratory (RSL) to more immediate needs. Funds intended for AMS TI were redirected to NNSA's new posture of leaning further forward throughout. AMS TI was brought to a complete halt on December 10, 2001. Then on April 30, 2002, NNSA Headquarters allowed the restart of AMS TI at the reduced level of $840,000. The year's events resulted in a slow beginning of several projects, some of which were resumed only a few weeks before the AMS TI Symposium held at RSL on July 30.

  15. Coseismic deformation of the 2001 El Salvador and 2002 Denali fault earthquakes from GPS geodetic measurements

    Science.gov (United States)

    Hreinsdottir, Sigrun

    2005-07-01

    GPS geodetic measurements are used to study two major earthquakes, the 2001 MW 7.7 El Salvador and 2002 MW 7.9 Denali Fault earthquakes. The 2001 MW 7.7 earthquake was a normal fault event in the subducting Cocos plate offshore El Salvador. Coseismic displacements of up to 15 mm were measured at permanent GPS stations in Central America. The GPS data were used to constrain the location of and slip on the normal fault. One month later a MW 6.6 strike-slip earthquake occurred in the overriding Caribbean plate. Coulomb stress changes estimated from the M W 7.7 earthquake suggest that it triggered the MW 6.6 earthquake. Coseismic displacement from the MW 6.6 earthquake, about 40 mm at a GPS station in El Salvador, indicates that the earthquake triggered additional slip on a fault close to the GPS station. The MW 6.6 earthquake further changed the stress field in the overriding Caribbean plate, with triggered seismic activity occurring west and possibly also to the east of the rupture in the days to months following the earthquake. The MW 7.9 Denali Fault earthquake ruptured three faults in the interior of Alaska. It initiated with a thrust motion on the Susitna Glacier fault but then ruptured the Denali and Totschunda faults with predominantly right-lateral strike-slip motion unilaterally from west to east. GPS data measured in the two weeks following the earthquake suggest a complex coseismic rupture along the faults with two main regions of moment release along the Denali fault. A large amount of additional data were collected in the year following the earthquake which greatly improved the resolution on the fault, revealing more details of the slip distribution. We estimate a total moment release of 6.81 x 1020 Nm in the earthquake with a M W 7.2 thrust subevent on Susitna Glacier fault. The slip on the Denali fault is highly variable, with 4 main pulses of moment release. The largest moment pulse corresponds to a MW 7.5 subevent, about 40 km west of the Denali

  16. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  17. NERSC 2001 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Hules, John (editor)

    2001-12-12

    The National Energy Research Scientific Computing Center (NERSC) is the primary computational resource for scientific research funded by the DOE Office of Science. The Annual Report for FY2001 includes a summary of recent computational science conducted on NERSC systems (with abstracts of significant and representative projects); information about NERSC's current systems and services; descriptions of Berkeley Lab's current research and development projects in applied mathematics, computer science, and computational science; and a brief summary of NERSC's Strategic Plan for 2002-2005.

  18. Facts 2002. The Norwegian petroleum sector; Fakta 2002. Norsk petroleumsvirksomhet

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The petroleum sector is highly significant for the Norwegian economy. Its share of gross domestic product, exports and total government revenues has been substantial over the past two decades, reaching a particularly high level in 2000 and 2001. The principal reason why revenues were so high in these two years is a combination of high oil prices, a strong USD against the NOK and historically high petroleum production. The share of petroleum investment in total capital spending in the Norwegian economy was at its highest in the early 1990s. Total investment in the petroleum sector has been above NOK 40 bn every year since 1992, and peaked in 1998 at roughly NOK 80 bn. Capital spending declined to around NOK 56.9 bn in 2001. The government's most important revenue sources in recent years have been cash flow from the state's direct financial interest (SDFI) and from taxes. Production of crude oil has averaged around three mill barrels per day since 1996. The figure for 2001 was 3.1 mill barrels. Including natural gas liquids (NGL) and condensate raises the 2001 average to 3.4 mill barrels oe per day. At 53 mill scm oe, gas production was also high in 2001. Oil production is expected to remain more or less unchanged over the next few years, and then to go into a gradual decline. Gas output, on the other hand, should expand substantially over the coming decade and is expected to be increasingly significant in Norwegian petroleum output in future. The petroleum sector is also a substantial player internationally. Norway ranks as the world's sixth largest producer and third largest net exporter of oil. It is also the world's third largest exporter of pipeline gas, and Norwegian foreign sales of this commodity accounted for about two per cent of global consumption in 2001. Roughly 10 per cent of west European gas consumption is covered from Norway. Several changes were made to state participation in the petroleum sector during 2001. The government sold

  19. Effective mitigation of debris flows at Lemon Dam, La Plata County, Colorado

    Science.gov (United States)

    deWolfe, V.G.; Santi, P.M.; Ey, J.; Gartner, J.E.

    2008-01-01

    To reduce the hazards from debris flows in drainage basins burned by wildfire, erosion control measures such as construction of check dams, installation of log erosion barriers (LEBs), and spreading of straw mulch and seed are common practice. After the 2002 Missionary Ridge Fire in southwest Colorado, these measures were implemented at Knight Canyon above Lemon Dam to protect the intake structures of the dam from being filled with sediment. Hillslope erosion protection measures included LEBs at concentrations of 220-620/ha (200-600% of typical densities), straw mulch was hand spread at concentrations up to 5.6??metric tons/hectare (125% of typical densities), and seeds were hand spread at 67-84??kg/ha (150% of typical values). The mulch was carefully crimped into the soil to keep it in place. In addition, 13 check dams and 3 debris racks were installed in the main drainage channel of the basin. The technical literature shows that each mitigation method working alone, or improperly constructed or applied, was inconsistent in its ability to reduce erosion and sedimentation. At Lemon Dam, however, these methods were effective in virtually eliminating sedimentation into the reservoir, which can be attributed to a number of factors: the density of application of each mitigation method, the enhancement of methods working in concert, the quality of installation, and rehabilitation of mitigation features to extend their useful life. The check dams effectively trapped the sediment mobilized during rainstorms, and only a few cubic meters of debris traveled downchannel, where it was intercepted by debris racks. Using a debris volume-prediction model developed for use in burned basins in the Western U.S., recorded rainfall events following the Missionary Ridge Fire should have produced a debris flow of approximately 10,000??m3 at Knight Canyon. The mitigation measures, therefore, reduced the debris volume by several orders of magnitude. For comparison, rainstorm

  20. Reanalysis of the RXTE observations of the black-hole candidate XTE J1650-500 in the 2001/2002 outburst

    International Nuclear Information System (INIS)

    Yan Lihong; Wang Jiancheng

    2012-01-01

    We present the results of the spectral fits made to 59 Rossi X-ray Timing Explorer (RXTE) observations of the Galactic X-Ray Black-Hole Candidate XTE J1650-500 covering the first 30d of its 2001/2002 outburst when the source was in a transition from the hard state to the soft state. The photon spectra can be well fitted with a phenomenological model of a power-law/cutoff power-law and a physical model of bulk-motion Comptonization. The spectral properties smoothly evolve away from the hard state and then stay in the soft state. The fitting results of the physical model reveal the peak of the burst had a flux of 2.90 × 10 −8 erg cm −2 s −1 in the 2–100 keV energy range and was observed on 2001 Sep. 9; it transitioned to the hard state. The total flux decays by a factor of ∼3 as it evolves into the soft state. The photon index Γ increases from ∼1.5 in the hard state and stays at ∼2.5 in the soft state. We found that the effective area of the high-energy X-ray emission region (the Compton cloud) decreases, i.e. the area of the Compton cloud decreases by a factor of ∼23 during the transition from the hard state to the soft state. Combining the new radio and quasi-periodic oscillation studies, the model of total flux in the 2–100 keV energy range, the jet emission and the timing analysis during the state transition, we suggest a possible geometry and evolution for the (jet+corona+disk) system, like that proposed by Kalemci et al. based on enhanced lags and peak frequency shift during the transition.

  1. NERSC 2001 Annual Report; ANNUAL

    International Nuclear Information System (INIS)

    Hules, John

    2001-01-01

    The National Energy Research Scientific Computing Center (NERSC) is the primary computational resource for scientific research funded by the DOE Office of Science. The Annual Report for FY2001 includes a summary of recent computational science conducted on NERSC systems (with abstracts of significant and representative projects); information about NERSC's current systems and services; descriptions of Berkeley Lab's current research and development projects in applied mathematics, computer science, and computational science; and a brief summary of NERSC's Strategic Plan for 2002-2005

  2. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martinson, Rick D.; Kovalchuk, Gregory M.; Ballinger, Dean (Pacific States Marine Fisheries Commission, The Dalles, OR)

    2006-04-01

    2005 was an average to below average flow year at John Day and Bonneville Dams. A large increase in flow in May improved migration conditions for that peak passage month. Spill was provided April through August and averaged about 30% and 48% of river flow at John Day and Bonneville Dams, respectively. Water temperature graphs were added this year that show slightly lower than average water temperature at John Day and slightly higher than average temperatures at Bonneville. The number of fish handled at John Day decreased from 412,797 in 2004 to 195,293 this year. Of the 195,293 fish, 120,586 (61.7%) were collected for researchers. Last year, 356,237 (86.3%) of the fish sampled were for researchers. This dramatic decline is the result of (1) fewer research fish needed (2) a smaller, lighter tag which allowed for tagging of smaller fish, and (3) a larger average size for subyearling chinook. These factors combined to reduce the average sample rate to 10.8%, about half of last year's rate of 18.5%. Passage timing at John Day was similar to previous years, but the pattern was distinguished by larger than average passage peaks for spring migrants, especially sockeye. The large spike in mid May for sockeye created a very short middle 80% passage duration of just 16 days. Other spring migrants also benefited from the large increase in flow in May. Descaling was lower than last year for all species except subyearling chinook and below the historical average for all species. Conversely, the incidence of about 90% of the other condition factors increased. Mortality, while up from last year for all species and higher than the historical average for all species except sockeye, continued to be low, less than 1% for all species. On 6 April a slide gate was left closed at John Day and 718 fish were killed. A gate position indicator light was installed to prevent reoccurrences. Also added this year was a PIT tag detector on the adult return-to-river flume. For the first time

  3. Hydropower operations data management at Bonneville Power Administration

    International Nuclear Information System (INIS)

    Dies, R.

    2006-01-01

    The decision support software used by Bonneville Power Administration (BPA) in its operation of the Federal Columbia River Power System in the Pacific northwest was presented along with examples of water resources data and information regarding weather and stream flow. Water resources data is used extensively in hydropower operations for planning purposes through to real-time operations. This includes long-term historical hydrology and realtime system information on snow cover, river discharges and water elevations. Since the data comes from many different sources, the quality and frequency varies, with sample intervals ranging from seconds to days. Some data may be intermittent and transmitted only when thresholds are reached. Data can be communication via SCADA telemetry, the Internet, direct satellite feed, telephone or fax. The key requirement for a decision support system is the reliable and easily accessed compilation of all this data. The BPA uses long-term planning models, system-wide generation scheduling applications, and near-real-time optimization of generating units. It was suggested that the hydrologic forecasting community could benefit from the utility's experience using these applications. tabs., figs

  4. The activities of the 42nd Japanese Antarctic Research Expedition (JARE-42 wintering team 2001-2002

    Directory of Open Access Journals (Sweden)

    Yoichi Motoyoshi

    2003-07-01

    Full Text Available The 42nd Japanese Antarctic Research Expedition (JARE-42 wintering team has conducted the Vth five-year JARE program during the period of February 1st 2001 to January 31st 2002, in which 40 members were engaged in the various scientific activities and maintenance of Syowa Station. The major observation programs of JARE-42 were as follows : Upper Atmo-spheric Physics-observations using Fabry-Perot imager, sodium Lidar and HFMF radar; Atmospheric Sciences and Glaciology-aerosols and air sampling, and shallow ice core drilling; Geophysics-superconducting gravity measurement, geodetic VLBI observations, and natural earthquake monitoring; Biology and Medicine-photosynthesis under sea water, populations census of penguins, and physiological and psychological adaptation to Antarctic environment, etc. In addition, satellite data receiving from ERS-2 and NOAA were also performed by using multi-purpose antenna at Syowa Station. Field activities included air sampling by using an aircraft, biological and geophysical observations, and reconnaissance survey for a possible aircraft runway around Syowa Station. Three inland traverse parties were organized, in which fuel transportation, maintenance of Dome Fuji Station, and various glaciological and geophysical observations were performed. A great efforts were made to maintain the facilities at Syowa Station by logistic personnel including mechanical engineers, radio operators, chefs, medical doctors, aircraft pilots and an engineer, an environmental engineer, a carpenter, a field assistant, a cinematographer, a satellite engineer, and an administrative officer. They were also involved in the support of field activities.

  5. Hydrology and surface morphology of the Bonneville Salt Flats and Pilot Valley Playa, Utah

    Science.gov (United States)

    Lines, Gregory C.

    1979-01-01

    The Bonneville Salt Flats and Pilot Valley are in the western part of the Great Salt Lake Desert in northwest Utah. The areas are separate, though similar, hydrologic basins, and both contain a salt crust. The Bonneville salt crust covered about 40 square miles in the fall of 1976, and the salt crust in Pilot Valley covered 7 square miles. Both areas lack any noticeable surface relief (in 1976, 1.3 feet on the Bonneville salt crust and 0.3 foot on the Pilot Valley salt crust).The salt crust on the Salt Flats has been used for many years for automobile racing, and brines from shallow lacustrine deposits have been used for the production of potash. In recent years, there has been an apparent conflict between these two major uses of the area as the salt crust has diminished in both thickness and extent. Much of the Bonneville Racetrack has become rougher, and there has also been an increase in the amount of sediment on the south end of the racetrack. The Pilot Valley salt crust and surrounding playa have been largely unused.Evaporite minerals on the Salt Flats and the Pilot Valley playa are concentrated in three zones: (1) a carbonate zone composed mainly of authigenic clay-size carbonate minerals, (2) a sulfate zone composed mainly of authigenic gypsum, and (3) a chloride zone composed of crystalline halite (the salt crust). Five major types of salt crust were recognized on the Salt Flats, but only one type was observed in Pilot Valley. Geomorphic differences in the salt crust are caused by differences in their hydrologic environments. The salt crusts are dynamic features that are subject to change because of climatic factors and man's activities.Ground water occurs in three distinct aquifers in much of the western Great Salt Lake Desert: (1) the basin-fill aquifer, which yields water from conglomerate in the lower part of the basin fill, (2) the alluvial-fan aquifer, which yields water from sand and gravel along the western margins of both playas, and (3) the

  6. Conductor qualification tests for the 30-MJ Bonneville Power Administration SMES coil

    International Nuclear Information System (INIS)

    Schermer, R.I.; Boenig, H.J.; Henke, M.; Turner, R.D.; Schramm, R.

    1980-01-01

    The 30-MJ energy storage coil for the Bonneville Power Administration requires a low-loss, cryostable conductor that is able to carry 4.9 kA in a field of 2.8 T and will maintain its properties over 10 8 partial discharge cycles. The multi-level cable which satisfies these requirements has been extensively tested at various stages in its development and in its final form. Tests have been performed to determine the effect of manufacturing options on ac losses, low temperature electrical resistivity, stability, and fatigue resistance of the insulated conductor. This paper will concentrate on the stability and fatigue tests which have not previously been reported

  7. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities, 1991

    International Nuclear Information System (INIS)

    Hawkes, L.A.; Martinson, R.D.; Smith, W.W.

    1992-04-01

    The 1991 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at John Day, The Dalles and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to Fish Passage Center for use in developing fish passage indices and migration timing, and for water budget and spill management

  8. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    Science.gov (United States)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  9. COMÉRCIO VAREJISTA PERIÓDICO NA FESTA DE TRINDADE, GO: SUAS TRANSFORMAÇÕES A PARTIR DA AÇÃO DO ESTADO ENTRE 2001 e 2002

    Directory of Open Access Journals (Sweden)

    Tito Oliveira Coelho

    2003-12-01

    Full Text Available O presente artigo é o resultado de uma análise das relações do comércio varejista periódicono tempo-espaço da Festa do Divino Pai Eterno, em Trindade, GO, com os elementosenvolvidos na organização desse evento. Com base em uma abordagem sócio-histórica ecultural-discursiva dos dados levantados em arquivos, jornais, revistas, bibliografiaspertinentes ao tema, entrevistas e aplicação de questionários em 2001 e 2002, procedeu-sea um estudo da festa como evento relevante para os comerciantes esporádicos, locadoresde pontos (habitantes da cidade, e para o município de Trindade.

  10. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  11. Intercontinental circulation of human influenza A(H1N2) reassortant viruses during the 2001-2002 influenza season.

    Science.gov (United States)

    Xu, Xiyan; Smith, Catherine B; Mungall, Bruce A; Lindstrom, Stephen E; Hall, Henrietta E; Subbarao, Kanta; Cox, Nancy J; Klimov, Alexander

    2002-11-15

    Reassortant influenza A viruses bearing the H1 subtype of hemagglutinin (HA) and the N2 subtype of neuraminidase (NA) were isolated from humans in the United States, Canada, Singapore, Malaysia, India, Oman, Egypt, and several countries in Europe during the 2001-2002 influenza season. The HAs of these H1N2 viruses were similar to that of the A/New Caledonia/20/99(H1N1) vaccine strain both antigenically and genetically, and the NAs were antigenically and genetically related to those of recent human H3N2 reference strains, such as A/Moscow/10/99(H3N2). All 6 internal genes of the H1N2 reassortants examined originated from an H3N2 virus. This article documents the first widespread circulation of H1N2 reassortants on 4 continents. The current influenza vaccine is expected to provide good protection against H1N2 viruses, because it contains the A/New Caledonia/20/99(H1N1) and A/Moscow/10/99(H3N2)-like viruses, which have H1 and N2 antigens that are similar to those of recent H1N2 viruses.

  12. Prevalence of 12-Month Alcohol Use, High-Risk Drinking, and DSM-IV Alcohol Use Disorder in the United States, 2001-2002 to 2012-2013: Results From the National Epidemiologic Survey on Alcohol and Related Conditions.

    Science.gov (United States)

    Grant, Bridget F; Chou, S Patricia; Saha, Tulshi D; Pickering, Roger P; Kerridge, Bradley T; Ruan, W June; Huang, Boji; Jung, Jeesun; Zhang, Haitao; Fan, Amy; Hasin, Deborah S

    2017-09-01

    Lack of current and comprehensive trend data derived from a uniform, reliable, and valid source on alcohol use, high-risk drinking, and DSM-IV alcohol use disorder (AUD) represents a major gap in public health information. To present nationally representative data on changes in the prevalences of 12-month alcohol use, 12-month high-risk drinking, 12-month DSM-IV AUD, 12-month DSM-IV AUD among 12-month alcohol users, and 12-month DSM-IV AUD among 12-month high-risk drinkers between 2001-2002 and 2012-2013. The study data were derived from face-to-face interviews conducted in 2 nationally representative surveys of US adults: the National Epidemiologic Survey on Alcohol and Related Conditions, with data collected from April 2001 to June 2002, and the National Epidemiologic Survey on Alcohol and Related Conditions III, with data collected from April 2012 to June 2013. Data were analyzed in November and December 2016. Twelve-month alcohol use, high-risk drinking, and DSM-IV AUD. The study sample included 43 093 participants in the National Epidemiologic Survey on Alcohol and Related Conditions and 36 309 participants in the National Epidemiologic Survey on Alcohol and Related Conditions III. Between 2001-2002 and 2012-2013, 12-month alcohol use, high-risk drinking, and DSM-IV AUD increased by 11.2%, 29.9%, and 49.4%, respectively, with alcohol use increasing from 65.4% (95% CI, 64.3%-66.6%) to 72.7% (95% CI, 71.4%-73.9%), high-risk drinking increasing from 9.7% (95% CI, 9.3%-10.2%) to 12.6% (95% CI, 12.0%-13.2%), and DSM-IV AUD increasing from 8.5% (95% CI, 8.0%-8.9%) to 12.7% (95% CI, 12.1%-13.3%). With few exceptions, increases in alcohol use, high-risk drinking, and DSM-IV AUD between 2001-2002 and 2012-2013 were also statistically significant across sociodemographic subgroups. Increases in all of these outcomes were greatest among women, older adults, racial/ethnic minorities, and individuals with lower educational level and family income. Increases were also

  13. CNSC annual report 2002-2003

    International Nuclear Information System (INIS)

    2003-01-01

    The Canadian Nuclear Safety Commission (CNSC) is Canada's nuclear regulator that has two business lines that support this strategic outcome: health, safety, security and environmental protection, and non-proliferation and safeguards. This report is details the activities of the CNSC for the year 2002-2003. In particular the report outlines the progress made in the implementation of risk-based approach to planning, budgeting and resource allocation, elements of enhanced security identified in the post September 11, 2001 security review as well as its role in nuclear emergency preparedness

  14. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  15. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  16. Sun-Earth Day, 2001

    Science.gov (United States)

    Adams, Mitzi L.; Mortfield, P.; Hathaway, D. H.; Whitaker, Ann F. (Technical Monitor)

    2001-01-01

    To promote awareness of the Sun-Earth connection, NASA's Marshall Space Flight Center, in collaboration with the Stanford SOLAR Center, sponsored a one-day Sun-Earth Day event on April 27, 2001. Although "celebrated" on only one day, teachers and students from across the nation, prepared for over a month in advance. Workshops were held in March to train teachers. Students performed experiments, results of which were shared through video clips and an internet web cast. Our poster includes highlights from student experiments (grades 2 - 12), lessons learned from the teacher workshops and the event itself, and plans for Sun-Earth Day 2002.

  17. Dam risk reduction study for a number of large tailings dams in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Verma, N. [AMEC Earth and Environmental Ltd., Mississauga, ON (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Martin, T. [AMEC Earth and Environmental, Burnaby, BC (Canada); Cacciotti, D. [AMEC Earth and Environmental Ltd., Sudbury, ON (Canada); Ross, T. [Vale Inco Ltd., Sudbury, ON (Canada)

    2009-07-01

    This paper discussed a risk reduction study conducted for 10 large tailings dams located at a central tailings facility in Ontario. Located near large industrial and urban developments, the tailings dams were built using an upstream method of construction that did not involve beach compaction or the provision of under-drainage. The study provided a historical background for the dam and presented results from investigations and instrumentation data. The methods used to develop the dam configurations were discussed, and remedial measures and risk assessment measures used on the dams were reviewed. The aim of the study was to address key sources of risk, which include the presence of high pore pressures and hydraulic gradients; the potential for liquefaction; slope instability; and the potential for overtopping. A borehole investigation was conducted and piezocone probes were used to obtain continuous data and determine soil and groundwater conditions. The study identified that the lower portion of the dam slopes were of concern. Erosion gullies could lead to larger scale failures, and elevated pore pressures could lead to the risk of seepage breakouts. It was concluded that remedial measures are now being conducted to ensure slope stability. 6 refs., 1 tab., 6 figs.

  18. Focus on safety : a comparative analysis of pipeline safety performance 2000-2002

    International Nuclear Information System (INIS)

    2004-01-01

    Canada's National Energy Board (NEB) is responsible for the promotion of safety, environmental protection and economic efficiency in the Canadian public interest in regulating the design, construction, operation and abandonment of interprovincial and international pipelines within Canada. This second annual report provides a review of the safety performance of oil and gas pipeline companies that are regulated by the NEB. The data used to prepare this report originates from two sources: incident reports submitted under the Onshore Pipeline Regulations, 1999, and from information voluntarily provided by pipeline companies under the Safety Performance Indicators (SPI) initiative. Data comparisons with external reference organizations were included. Six key indicators have been identified to provide comprehensive measures of safety performance for pipeline companies: fatalities, ruptures, injury frequencies, liquid releases, gas releases, and unauthorized activities on the right of way. The safety performance of the federally regulated pipeline industry within Canada was satisfactory during this reporting period (2000-2002). The contractor injury frequency rates reported in 2002 were lower than those reported in 2001, and exhibited more consistency with the levels reported in 2000. The NEB is of the opinion that the elevated number of liquid hydrocarbon spills reported in 2000 were a result of elevated construction levels. No fatalities were reported. There was an increase to three from two in the number of ruptures, due in large part to metal loss (corrosion) and cracking, and external interference (third party damage). The number of spills increased to 76 in 2002 from 55 in 2001, which appears to be more in line with industry averages. The volume of hydrocarbon liquid released in 2002 represented one third the volume released in 2001. refs., 5 tabs., 14 figs

  19. Evidence for the presence of bluetongue virus in Kosovo between 2001 and 2004.

    Science.gov (United States)

    Osmani, A; Murati, B; Kabashi, Q; Goga, I; Berisha, B; Wilsmore, A J; Hamblin, C

    2006-03-25

    In 2001, clinical cases of bluetongue were observed in Kosovo, and in that year and in 2003 and 2004, serum samples were collected from cattle and small ruminants and tested for antibodies to bluetongue virus. The results provide evidence that bluetongue virus was not present in Kosovo before the summer of 2001, but that the virus circulated subclinically among the cattle and sheep populations of Kosovo in 2002, 2003 and 2004.

  20. Bonneville Power Administration 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  1. Migratory Behavior and Survival of Juvenile Salmonids in the Lower Columbia River, Estuary, and Plume in 2010

    Energy Technology Data Exchange (ETDEWEB)

    McMichael, Geoffrey A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, John R. [Univ. of Washington, Seattle, WA (United States); Deters, Katherine A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Univ. of Washington, Seattle, WA (United States); Titzler, P. Scott [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, Michael S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Trott, Donna M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2011-09-01

    Uncertainty regarding the migratory behavior and survival of juvenile salmonids passing through the lower Columbia River and estuary after negotiating dams on the Federal Columbia River Power System (FCRPS) prompted the development and application of the Juvenile Salmon Acoustic Telemetry System (JSATS). The JSATS has been used to investigate the survival of juvenile salmonid smolts between Bonneville Dam (river kilometer (rkm) 236) and the mouth of the Columbia River annually since 2004. In 2010, a total of 12,214 juvenile salmonids were implanted with both a passive integrated transponder (PIT) and a JSATS acoustic transmitter. Using detection information from JSATS receiver arrays deployed on dams and in the river, estuary, and plume, the survival probability of yearling Chinook salmon and steelhead smolts tagged at John Day Dam was estimated form multiple reaches between rkm 153 and 8.3 during the spring. During summer, the survival probability of subyearling Chinook salmon was estimated for the same reaches. In addition, the influence of routes of passage (e.g., surface spill, deep spill, turbine, juvenile bypass system) through the lower three dams on the Columbia River (John Day, The Dalles, and Bonneville) on juvenile salmonid smolt survival probability from the dams to rkm 153 and then between rkm 153 and 8.3 was examined to increase understanding of the immediate and latent effects of dam passage on juvenile salmon survival. Similar to previous findings, survival probability was relatively high (>0.95) for most groups of juvenile salmonids from the Bonneville Dam tailrace to about rkm 50. Downstream of rkm 50 the survival probability of all species and run types we examined decreased markedly. Steelhead smolts suffered the highest mortality in this lower portion of the Columbia River estuary, with only an estimated 60% of the tagged fish surviving to the mouth of the river. In contrast, yearling and subyearling Chinook salmon smolts survived to the mouth

  2. Wide-Area Energy Storage and Management System to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

    DEFF Research Database (Denmark)

    Makarov, Yuri V.; Yang, Bo; DeSteese, John G.

    2009-01-01

    This paper addresses the issue of mitigating additional intermittency and fast ramps that are expected to occur at high penetration levels of intermittent resources, including wind generation resources, in the Bonneville Power Administration (BPA) and the California Independent System Operator...

  3. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    Science.gov (United States)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  4. THE 2002 DIG TRAINING

    CERN Multimedia

    Mapelli, L.

    The Detector Interface Group organized this year a training program, divided in two sessions, for people wishing to learn how to use and customize the modern DAQ prototype used for test beam and laboratory data acquisition by several groups in ATLAS. This Data Acquisition prototype is an evolution of the DAQ/EF-1 prototype where some parts have been evolving for exploitation at the test beam first (Tilecal starting in 2000, Muon MDT in 2001 and Pixel in 2002) and later for laboratory tests (LAr starting in 2000, Muons MDT and TGC in 2001). The training sessions have been organized with the idea of building a detector data acquisition to read data from a detector crate and send the data over the Read Out Link to the remaining part of the DAQ. The first session took place last April 18th-19th. It was organized with some presentations and many hand-on exercises to learn how to build a DAQ configuration database and a controller to configure, control and steer the DAQ at the level of a hypothetic detector cra...

  5. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  6. UCI2001: The updated catalogue of Italy

    International Nuclear Information System (INIS)

    Peresan, A.; Panza, G.F.

    2002-05-01

    A new updated earthquake catalogue for the Italian territory, named UCI2001, is described here; it consists of an updated and revised version of the CCI1996 catalogue (Peresan et al., 1997). The revision essentially corresponds to the incorporation of data from the NEIC (National Earthquake Information Centre) and ALPOR (Catalogo delle Alpi Orientali) catalogues, while the updating is performed using the NEIC Preliminary Determinations of Epicenters since 1986. A brief overview of the catalogues used for the monitoring of seismicity in the Italian area is provided, together with the essential information about the structure of the UCI2001 catalogue and a description of its format. A complete list of the events, as on May 1 2002, is given in the Appendix. (author)

  7. Radioactivity in food and the environment, 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This report contains the results of radiological monitoring of food and the environment throughout the United Kingdom, the Channel Islands and the Isle of Man. The primary purpose of the monitoring programmes is to provide an independent check on the effects of discharges made by users of radioactive materials in the United Kingdom, and to ensure that any radioactivity present in food and the environment does not compromise public health.' For the first time, it represents a comprehensive summary of results across the United Kingdom from programmes sponsored by the Environment Agency, the Environment and Heritage Service, the Food Standards Agency and the Scottish Environment Protection Agency. The results of these monitoring programmes demonstrate that in 2002 even the most exposed members of the public received radiation doses from food and other pathways that were below the statutory United Kingdom annual dose limit to members of the public of 1 mSv (millisievert), European Union limits and Government targets. Assessed doses at all major sites in the United Kingdom are shown in Figure S and are detailed in the Summary Table. The highest radiation doses were received by a group of high-rate consumers offish and shellfish in Cumbria. The doses received by these consumers are a combination of contributions from liquid discharges from both Sellafield and from radioactivity in the environment as a result of past discharges from the Rhodia Consumer Specialties Ltd. (formerly Albright and Wilson) plant at Whitehaven. The dose to these high-rate consumers (including external doses) from Sellafield discharges was estimated to be 0.19 mSv in 2002 compared with 0.15 mSv in 2001. Concentrations in food and dose rates were largely unchanged in 2002 though there were some small increases in concentrations of tritium, carbon-14 and technetium-99 in seafood. The main reason for the increase in dose was an increase in the amount of seafood eaten. This group also received an

  8. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  9. Effect of a dam on epilithic algal communities of a mountain stream: before-after dam construction comparison

    Directory of Open Access Journals (Sweden)

    Luciana Cibils Martina

    2013-02-01

    Full Text Available In this study we evaluated the effect of a dam on epilithic algal communities by analyzing community response after dam construction and by comparing community composition, structure and biomass upstream and downstream of the dam. Samples of epilithic algae and environmental data were collected at each site during high and low water periods before and after dam construction in Achiras Stream (Córdoba, Argentina. Ordinations showed modifications in algal assemblages after dam construction and downstream of the dam. Ordinations also suggested a loss of seasonality at the downstream site since the assemblages were similar between hydrological periods after dam construction. Indicator species, obtained by the Indicator Value method, showed that, after dam construction, there could have been an increase in nutrient concentration and a release of plankton from the impoundment. Abundance, richness and diversity were altered after dam construction as assessed by ANOVAs derived from a modified BACI Design. Proportion of early-successional species was higher at the upstream site while late-successional species were dominant at the downstream site, as predicted. Lower fluctuations in discharge downstream of the dam may have helped succession advance, whereas at the upstream site, mainly during the high water period, floods could have caused sloughing of life forms from the outer layers of the biofilm, resetting the algal community to early successional stages. It may be concluded that the dam affected algal community and favored succession advance mainly by reducing current velocity and flow fluctuations.

  10. Fisheries Enhancement on the Coeur d'Alene Indian Reservation; Hangman Creek, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Peters, Ronald; Kinkead, Bruce; Stanger, Mark

    2003-07-01

    Historically, Hangman Creek produced Chinook salmon (Oncorhynchus tshawytscha) and Steelhead trout (Oncorhynchus mykiss) for the Upper Columbia Basin Tribes. One weir, located at the mouth of Hangman Creek was reported to catch 1,000 salmon a day for a period of 30 days a year (Scholz et al. 1985). The current town of Tekoa, Washington, near the state border with Idaho, was the location of one of the principle anadromous fisheries for the Coeur d'Alene Tribe (Scholz et al. 1985). The construction, in 1909, of Little Falls Dam, which was not equipped with a fish passage system, blocked anadromous fish access to the Hangman Watershed. The fisheries were further removed with the construction of Chief Joseph and Grand Coulee Dams. As a result, the Coeur d'Alene Indian Tribe was forced to rely more heavily on native fish stocks such as Redband trout (Oncorhynchus mykiss gairdneri), Westslope Cutthroat trout (O. clarki lewisii), Bull trout (Salvelinus confluentus) and other terrestrial wildlife. Historically, Redband and Cutthroat trout comprised a great deal of the Coeur d'Alene Tribe's diet (Power 1997).

  11. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  12. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  13. New guidelines for dam safety classification

    International Nuclear Information System (INIS)

    Dascal, O.

    1999-01-01

    Elements are outlined of recommended new guidelines for safety classification of dams. Arguments are provided for the view that dam classification systems should require more than one system as follows: (a) classification for selection of design criteria, operation procedures and emergency measures plans, based on potential consequences of a dam failure - the hazard classification of water retaining structures; (b) classification for establishment of surveillance activities and for safety evaluation of dams, based on the probability and consequences of failure - the risk classification of water retaining structures; and (c) classification for establishment of water management plans, for safety evaluation of the entire project, for preparation of emergency measures plans, for definition of the frequency and extent of maintenance operations, and for evaluation of changes and modifications required - the hazard classification of the project. The hazard classification of the dam considers, as consequence, mainly the loss of lives or persons in jeopardy and the property damages to third parties. Difficulties in determining the risk classification of the dam lie in the fact that no tool exists to evaluate the probability of the dam's failure. To overcome this, the probability of failure can be substituted for by a set of dam characteristics that express the failure potential of the dam and its foundation. The hazard classification of the entire project is based on the probable consequences of dam failure influencing: loss of life, persons in jeopardy, property and environmental damage. The classification scheme is illustrated for dam threatening events such as earthquakes and floods. 17 refs., 5 tabs

  14. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  15. The Glen Canyon Dam adaptive management program: progress and immediate challenges

    Science.gov (United States)

    Hamill, John F.; Melis, Theodore S.; Boon, Philip J.; Raven, Paul J.

    2012-01-01

    Adaptive management emerged as an important resource management strategy for major river systems in the United States (US) in the early 1990s. The Glen Canyon Dam Adaptive Management Program (‘the Program’) was formally established in 1997 to fulfill a statutory requirement in the 1992 Grand Canyon Protection Act (GCPA). The GCPA aimed to improve natural resource conditions in the Colorado River corridor in the Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona that were affected by the Glen Canyon dam. The Program achieves this by using science and a variety of stakeholder perspectives to inform decisions about dam operations. Since the Program started the ecosystem is now much better understood and several biological and physical improvements have been achieved. These improvements include: (i) an estimated 50% increase in the adult population of endangered humpback chub (Gila cypha) between 2001 and 2008, following previous decline; (ii) a 90% decrease in non-native rainbow trout (Oncorhynchus mykiss), which are known to compete with and prey on native fish, as a result of removal experiments; and (iii) the widespread reappearance of sandbars in response to an experimental high-flow release of dam water in March 2008.Although substantial progress has been made, the Program faces several immediate challenges. These include: (i) defining specific, measurable objectives and desired future conditions for important natural, cultural and recreational attributes to inform science and management decisions; (ii) implementing structural and operational changes to improve collaboration among stakeholders; (iii) establishing a long-term experimental programme and management plan; and (iv) securing long-term funding for monitoring programmes to assess ecosystem and other responses to management actions. Addressing these challenges and building on recent progress will require strong and consistent leadership from the US Department of the Interior

  16. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the Interior, through his agent, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam...

  17. Excavation of the Surikamigawa dam diversion tunnel. Surikamigawa dam karihaisui tunnel kantsu

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, T.; Konno, T. (Ministry of Construction, Tokyo (Japan))

    1994-04-01

    A bypass tunnel construction has been completed at the Surikamigawa dam (Japan). This paper describes the summary of the construction. The full-swing dam construction work is scheduled to begin in 1995. The soils distributed near the dam site consist of lapillus tuff containing andesite-based light stones and tuff-based conglomerates containing large gravels. Excavation of the dam diversion tunnel has used a blasting method, and the tunnel construction has adopted an automatic tunnel cross section marking system and a non-electric explosion method. This marking system is a system to irradiate a laser beam onto the facing to depict excavation lines that realizes labor saving and high-accuracy excavation. The error at the tunnel completion was found 20 mm. The non-electric explosion method ignites a coated explosive layer with an impact wave, which is electrostatically safe, and reduces blasting vibration. Electric detonators have also been used because of using ANFO explosives. The result obtained from measurements of inner space displacement necessary for the blasting process has indicated that the area near the dam site consists of stable mountains. 6 figs., 4 tabs.

  18. Three Sisters Dam modifications and performance

    Energy Technology Data Exchange (ETDEWEB)

    Courage, L.J.R. [Monenco AGRA Inc., Calgary, AB (Canada)

    1995-12-31

    Recent modifications and maintenance carried out at the Three Sisters Dam, in the Alberta Rockies south of the town of Canmore, were described. A detailed account was given of the dam`s geological setting, its abnormally high leakage through the foundation and its sinkhole activity. Results of studies aimed at finding the cause of leakage and sinkhole occurrences were reviewed. Modifications made to the dam since 1951 were detailed, as were modifications to handle probable maximum flood levels. Three approaches for estimating failure probabilities after identification of failure modes were described. The overall conclusion was that based on constant leakage, no settlement in the dam, penstocks, or the powerhouse since construction, the Three Sisters Dam was stable. 1 ref.

  19. Attention to impact pathways in EISs of large dam projects

    International Nuclear Information System (INIS)

    Brismar, Anna

    2004-01-01

    The importance of addressing cumulative environmental impacts in Environmental Impact Statements (EISs) of large development projects is increasingly underlined. However, cumulative impacts are generated through complex impact pathways, involving multiple root causes and lower and higher order effects, interlinked by cause-effect relationships. Consideration to potential impact pathways may thus be difficult without appropriate analytical methods, expertise, and supportive Environmental Impact Assessment guidelines and terms-of-references (TOR). This paper presents the results of an analysis of six EISs prepared for large dam projects between 1994 and 2001. The objective was to analyze if, how, and to what extent potential impact pathways involved in the generation of dam-related cumulative impacts have been addressed in the analyzed material. For this purpose, a theoretical framework was developed, which identifies four key root causes, their potential effects, and associated cause-effect relationships. The analysis revealed various shortcomings. Important imbalances were found in the degree of attention given to effects of different categories. Lower order effects received greater attention than higher order, and the potential effects of reservoir filling were more extensively attended to than those of flow blockage, storage, and regulation. Most importantly, little effort was made to carefully explain the potential impact pathways involved; root causes were often referred to in general terms only, and potential pathways leading up to an anticipated higher order effect or following upon an expected lower order effect were often inadequately addressed or ignored. Probable reasons for the discovered shortcomings are discussed and recommendations are presented for improving the World Bank EIA guidelines for large dam projects

  20. Snake River Sockeye Salmon Captive Broodstock Program; Hatchery Element, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Willard, Catherine; Baker, Dan J.; Heindel, Jeff A. (Idaho Department of Fish and Game, Boise, ID)

    2003-12-01

    On November 20, 1991, the National Marine Fisheries Service listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Idaho Department of Fish and Game, the Shoshone-Bannock Tribes, and the National Marine Fisheries Service initiated efforts to conserve and rebuild populations in Idaho. Initial steps to recover sockeye salmon included the establishment of a captive broodstock program at the Idaho Department of Fish and Game Eagle Fish Hatchery. Sockeye salmon broodstock and culture responsibilities are shared with the National Oceanic and Atmospheric Administration at two locations adjacent to Puget Sound in Washington State. Activities conducted by the Shoshone-Bannock Tribes and the National Oceanic and Atmospheric Administration are reported under separate cover. Idaho Department of Fish and Game monitoring and evaluation activities of captive broodstock program fish releases (annual report to the Bonneville Power Administration for the research element of the program) are also reported separately. Captive broodstock program activities conducted between January 1, 2002 and December 31, 2002 for the hatchery element of the program are presented in this report. n 2002, 22 anadromous sockeye salmon returned to the Sawtooth Valley. Fifteen of these adults were captured at adult weirs located on the upper Salmon River and on Redfish Lake Creek. Seven of the anadromous sockeye salmon that returned were observed below the Sawtooth Fish Hatchery weir and allowed to migrate upstream volitionally (following the dismantling of the weir on September 30, 2002). All adult returns were released to Redfish Lake for natural spawning. Based on their marks, returning adult sockeye salmon originated from a variety of release options. Sixty-six females from brood year 1999 and 28 females from brood year 2000 captive broodstock groups were spawned at the Eagle Hatchery in 2002. Spawn pairings produced approximately 65

  1. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  2. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities -- 1995. Annual report 1995

    International Nuclear Information System (INIS)

    Martinson, R.D.; Graves, R.J.; Langeslay, M.J.; Killins, S.D.

    1996-12-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams

  3. Health impacts of large dams

    International Nuclear Information System (INIS)

    Lerer, L.B.

    1999-01-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects

  4. Chinook Salmon Adult Abundance Monitoring in Lake Creek, Idaho, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Faurot, Dave; Kucera, Paul

    2003-11-01

    Underwater time- lapse video technology has been used to monitor adult spring and summer chinook salmon (Oncorhynchus tshawytscha) escapement into the Secesh River and Lake Creek, Idaho, since 1998. Underwater time-lapse videography is a passive methodology that does not trap or handle this Endangered Species Act listed species. Secesh River chinook salmon represent a wild spawning aggregate that has not been directly supplemented with hatchery fish. The Secesh River is also a control stream under the Idaho Salmon Supplementation study. This project has successfully demonstrated the application of underwater video monitoring to accurately quantify chinook salmon abundance in Lake Creek in 1998, 1999, 2001 and 2002. The adult salmon spawner escapement into Lake Creek in 2002 was 410 fish. Jack salmon comprised 7.1 percent of the run. Estimated hatchery composition was 6.1 percent of the spawning run. The first fish passage on Lake Creek was recorded on June 26, 15 days after installation of the fish counting station. Peak net upstream movement of 41 adults occurred on July 8. Peak of total movement activity was August 18. The last fish passed through the Lake Creek fish counting station on September 2. Snow pack in the drainage was 91% of the average during the winter of 2001/2002. Video determined salmon spawner abundance was compared to redd count expansion method point estimates in Lake Creek in 2002. Expanded index area redd count and extensive area redd count point estimates in 2002, estimated from one percent fewer to 56 percent greater number of spawners than underwater video determined spawner abundance. Redd count expansion methods varied from two percent fewer to 55 percent greater in 2001, 11 to 46 percent fewer in 1999 and 104 to 214 percent greater in 1998. Redd count expansion values had unknown variation associated with the point estimates. Fish per redd numbers determined by video abundance and multiple pass redd counts of the larger extensive survey

  5. Deformation performance of Waba Dam

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, T.; Bhardwaj, V.; Hassan, P. [Ontario Power Generation, Niagara-on-the-Lake, ON (Canada); Cragg, C. [Cragg Consulting Services, Toronto, ON (Canada)

    2009-07-01

    This paper described the performance of the Waba Dam which is being monitored as part of Ontario Power Generation's Dam Safety Program. It described the deformations that have been observed in this 3600 ft long earthfill dam which lies on marine clay in eastern Ontario. An extensive instrumentation program, including foundation settlement gauges, surface monuments, slope inclinometers, load cells and piezometers has been in effect since the construction of the dam in 1975. Significant settlement has occurred at Waba Dam since its construction. Wide berms were provided upstream and downstream beyond the slopes of the main fill to ensure stability of the dyke on the soft clay foundation and the crest elevations were designed to allow for the expected settlement in the foundation which would be overstressed by the dam loading. Based on current settlements, future settlements are predicted based on Asaoka's method. Inclinometer measurements have shown a foundation lateral spreading of 12 in. The lateral versus vertical deformations were found to be comparable to well behaving embankments reported in the literature. These analyses indicate that Waba Dam is performing well and should continue to perform well into the future. 8 refs., 1 tab., 14 figs.

  6. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  7. Political economy of internet : penetration in Finland and Sweden (1995-2001) / Meelis Kitsing

    Index Scriptorium Estoniae

    Kitsing, Meelis

    2002-01-01

    Kaanel ajak. ilmumisaeg 2001/2002. Vaba turumajanduse lipulaeva Ameerika Ühendriikide kõrval on samavõrd hästi arenenud infomajandus Põhjamaades. Soome ja Rootsi majandusmudeli puhul on riigi poliitika ülesanne toetada kohanemist muutuvate majandusoludega

  8. Design and operation of the 30-MJ superconducting magnetic-storage system on the Bonneville Power Administration bus

    International Nuclear Information System (INIS)

    Schermer, R.I.; Barron, M.H.; Boenig, H.J.

    1983-01-01

    A superconducting magnetic-energy-storage (SMES) unit is suitable for power-system stabilization because it can provide positive damping by absorbing or releasing energy with a relatively fast response time, 10 ms. In the fall of 1982, an SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration as an experiment in monitoring, predicting and improving system stability. This paper reports principally on the system testing

  9. Nuclear safety review for the year 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. The final version of the Nuclear Safety Review for the Year 2002 was prepared in the light of the discussion by the Board of Governors in March 2002. This report presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety at the end of 2002. This overview is supported by a more detailed factual account of safety-related events and issues worldwide during 2002. National authorities and the international community continued to reflect and act upon the implications of the events of II September 2001 for nuclear, radiation, transport and waste safety. In the light of this, the Agency has decided to transfer the organizational unit on nuclear security from the Department of Safeguards to the Department of Nuclear Safety (which thereby becomes the Department of Nuclear Safety and Security). By better exploiting the synergies between safety and security and promoting further cross-fertilization of approaches, the Agency is trying to help build up mutually reinforcing global regimes of safety and security. However, the Nuclear Safety Review for the Year 2002 addresses only those areas already in the safety programme. This short analytical overview is supported by a second part (corresponding to Part I of the Nuclear Safety Reviews of previous years), which describes significant safety-related events and issues worldwide during 2002. A Draft Nuclear Safety Review for the Year 2002 was submitted to the March 2003 session of the Board of Governors in document GOV/2003/6.

  10. Nuclear safety review for the year 2002

    International Nuclear Information System (INIS)

    2003-08-01

    The Nuclear Safety Review reports on worldwide efforts to strengthen nuclear, radiation and transport safety and the safety of radioactive waste management. The final version of the Nuclear Safety Review for the Year 2002 was prepared in the light of the discussion by the Board of Governors in March 2002. This report presents an overview of the current issues and trends in nuclear, radiation, transport and radioactive waste safety at the end of 2002. This overview is supported by a more detailed factual account of safety-related events and issues worldwide during 2002. National authorities and the international community continued to reflect and act upon the implications of the events of II September 2001 for nuclear, radiation, transport and waste safety. In the light of this, the Agency has decided to transfer the organizational unit on nuclear security from the Department of Safeguards to the Department of Nuclear Safety (which thereby becomes the Department of Nuclear Safety and Security). By better exploiting the synergies between safety and security and promoting further cross-fertilization of approaches, the Agency is trying to help build up mutually reinforcing global regimes of safety and security. However, the Nuclear Safety Review for the Year 2002 addresses only those areas already in the safety programme. This short analytical overview is supported by a second part (corresponding to Part I of the Nuclear Safety Reviews of previous years), which describes significant safety-related events and issues worldwide during 2002. A Draft Nuclear Safety Review for the Year 2002 was submitted to the March 2003 session of the Board of Governors in document GOV/2003/6

  11. Comportamiento epidemiologico del cáncer de colon en el área metropolitana de cúcuta 2001-2002

    Directory of Open Access Journals (Sweden)

    Alix Bohorquez-Ortiz

    2004-07-01

    Full Text Available In order to identify characteristics and epidemiological risk factors prevalent for colon cancer in the adult population Cucuta, this study is development of type descriptive, cross-sectional prospective. The study population consisted of 37 Patients with this diagnosis who attended the public and private institutions municipal health Cucuta (N. S. in the period 2001 2002. It found that the risk increases with age, most affected is the female sex, history Family of colon cancer in other organs, polyposis and ulcerative colitis occurred in 5.4 10 patients of the study. They were identified as dietary risk factors high consumption of beef, sausages intake of food, reuse in cooking oils of food and consumption of reheated meals. Is widely used in diet refined flour corn for the production and consumption of arepas. Risk factors in the lifestyle that They were presented with the highest percentage sedentary lifestyle and smoking, followed by consumption alcohol and obesity. A high percentage say they have had constipation or diarrhea symptoms. 50% report Self-medication for the management of these symptoms, using both pharmacologic agents as the use of folk medicine. as conditions precursor are rectal bleeding with 73%, weight loss with 63.6%, followed by hemorrhoids and anemia with 36.4%. Were found long periods of disease progression before the diagnosis was defined.

  12. Political economy of internet : penetration in Finland and Sweden (1995-2001) / Meelis Kitsing

    Index Scriptorium Estoniae

    Kitsing, Meelis

    2001-01-01

    Kaanel ajak. ilmumisaeg Winter 2001/2002. Vaba turumajanduse lipulaeva Ameerika Ühendriikide kõrval on samavõrd hästi arenenud infomajandus Põhjamaades. Soome ja Rootsi majandusmudeli puhul on riigi poliitika ülesanne toetada kohanemist muutuvate majandusoludega

  13. Fragility Analysis of Concrete Gravity Dams

    Science.gov (United States)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  14. Habitat Evaluation Procedures (HEP) Report : Oleson Tracts of the Tualatin River National Wildlife Refuge, 2001-2002 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Allard, Donna; Smith, maureen; Schmidt, Peter

    2004-09-01

    Located in the northern Willamette River basin, Tualatin River National Wildlife Refuge (Refuge) was established in 1992 with an approved acquisition boundary to accommodate willing sellers with potentially restorable holdings within the Tualatin River floodplain. The Refuge's floodplain of seasonal and emergent wetlands, Oregon ash riparian hardwood, riparian shrub, coniferous forest, and Garry oak communities are representative of remnant plant communities historically common in the Willamette River valley and offer an opportunity to compensate for wildlife habitat losses associated with the Willamette River basin federal hydroelectric projects. The purchase of the Oleson Units as additions to the Refuge using Bonneville Power Administration (BPA) funds will partially mitigate for wildlife habitat and target species losses incurred as a result of construction and inundation activities at Dexter and Detroit Dams. Lands acquired for mitigation of Federal Columbia River Power System (FCRPS) impacts to wildlife are evaluated using the Habitat Evaluation Procedures (HEP) methodology, which quantifies how many Habitat Units (HUs) are to be credited to BPA. HUs or credits gained lessen BPA's debt, which was formally tabulated in the FCRPS Loss Assessments and adopted as part of the Northwest Power and Conservation Council's Fish and Wildlife Program as a BPA obligation (NWPCC, 1994 and 2000). There are two basic management scenarios to consider for this evaluation: (1) Habitats can be managed without restoration activities to benefit wildlife populations, or (2) Habitats can be restored using a number of techniques to improve habitat values more quickly. Without restoration, upland and wetland areas may be periodically mowed and disced to prevent invasion of exotic vegetation, volunteer trees and shrubs may grow to expand forested areas, and cooperative farming may be employed to provide forage for migrating and wintering waterfowl. Abandoned cropland

  15. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  16. Matahina Dam : lessons learned from an earthquake-related internal erosion incident at the Matahina Dam, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Gillon, M. [Damwatch Services Ltd., Wellington (New Zealand)

    2009-07-01

    This case history discussed internal erosion damage and crest subsidence caused by an earthquake at the Matahina Dam in New Zealand. The study showed that cracking and internal erosion was initiated during the 1967 reservoir filling operation. Located in an area of active volcanism and faulting, the dam is located on a river with extensive erosion through an ignimbrite flow. The dam's core is founded on compact Tertiary age sediments overlain by sand and gravel deposits beneath the shoulders of the dam. The earthquake caused a rupture along an unidentified fault trace 12 km from the dam. The horizontal base acceleration recorded at the dam was 3.25 m/s. Transverse cracking was observed at each abutment, and deformations were observed in the rockfill. An investigation program was conducted to determine the dam's integrity. Piezometer measurements showed widespread fluctuations. It was concluded that the lack of an effective filter was a significant design omission. 12 refs., 12 figs.

  17. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  18. Technical bulletin : structural considerations for dam safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This technical bulletin discussed issues related to the safety assessment of concrete water-retaining structures and timber dams. Structures reviewed in the paper included gravity dams; buttress dams; arch dams; spillway structures; intake structures; power plants; roller compacted concrete dams; and timber dams. A variety of issues related to the loss of cohesive bond and discontinuities in bedrock foundations were reviewed with reference to issues related to compressive strength, tensile strength, and shear strength. Static failure modes and failure mechanisms related to dam failures were also described. Visual indicators for potential failures include abutment and foundation movement, seepage, and structure movements. Loading combinations were discussed, and performance indicators for gravity dams were provided. Methods of analysis for considering load characteristics, structure types and geological conditions were also discussed. Modelling techniques for finite element analysis were also included. 16 refs., 3 tabs., 5 figs.

  19. Fish ladder of Lajeado Dam: migrations on one-way routes?

    Directory of Open Access Journals (Sweden)

    Angelo Antônio Agostinho

    Full Text Available Fish ladders are generally conceived to reestablish connectivity among critical habitats for migratory species, thus mitigating the impacts of the blockage of migration routes by dams. If this management tool is to be meaningful for conserving fish species, it must provide a fully permeable connection and assure both upward and downward movements. However, because reservoirs have very different hydrodynamics than the original river, it is expected that, at least in the inner area, they may constitute an additional barrier to this movement, especially for descending fish. Thus, the present study sought to determine if migratory fish and their offspring disperse downstream from the dam after ascending a ladder and spawning in the upper reaches of a basin. To achieve this purpose, we evaluated the limitation imposed by lentic areas to the descent of eggs, larvae and adults of migratory species; we also determined the abundance and composition of larvae present in the plankton near the dam, and compared the intensity of the upward and downward movements of adult fish. Samples of ichthyoplankton were taken upriver, inside the reservoir, in the river downstream from the dam, and in the forebay of the Lajeado Dam on the Tocantins River (Luis Eduardo Magalhães Hydroelectric Plant, from October, 1999 through September, 2004. The densities of fish ascending and descending the ladder were determined experimentally on eight occasions, from June, 2004 to March, 2005. Due to difficulties in identifying the true fish origin (up or down in the environments connected by the fish passage system, the evaluation of the distribution of migratory fish in reservoirs was based on the landings of the commercial fishery conducted along the Itaipu Reservoir during the four years preceding (2001 through 2003 the construction of the lateral channel (fish-passage mechanism. Fish eggs and larvae drifting down the Tocantins River did not appear in samples taken in the lower

  20. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  1. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    Science.gov (United States)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  2. Sediment Transport Over Run-of-River Dams

    Science.gov (United States)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  3. Hydraulics of embankment-dam breaching

    Science.gov (United States)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence

  4. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available where four major South African dams are connected to Twitter and Facebook (and other social media such as MXit and Google Chat) in a mechanism which would be easy to replicate for additional dams or rivers. Data is supplied by the South African...

  5. Student Support Funding for Higher Education Institutions, 2001-02. Report.

    Science.gov (United States)

    Higher Education Funding Council for England, Bristol.

    This publication provides information about the allocation of funds for student support to higher education institutions in England in 2001-2002 and requests monitoring information on the use of these funds. Student support funds include a variety of services to students, including fee waivers, help with living costs in some cases, and child care…

  6. Changes in Alcohol Consumption: United States, 2001-2 to 2012-13

    Science.gov (United States)

    Dawson, Deborah A.; Goldstein, Rise B.; Saha, Tulshi D.; Grant, Bridget F.

    2014-01-01

    Background Documenting changes in alcohol consumption is critical for assessing future health service and alcohol treatment needs, evaluating efforts to modify drinking behavior and understanding the impact of shifting demographics and social norms. For the period since the year 2000, published data on drinking trends have been scarce and inconsistent. Methods Using data from two large, nationally representative surveys of U.S. adults (2001-2002 and 2012-2013) that contained virtually identical questions on consumption, we assessed differences by period in the prevalence of drinking, volume of intake, frequency of drinking and prevalence of ≥monthly heavy episodic drinking (HED) and determined whether changes in consumption were consistent across beverage types and in population subgroups. Results Between 2001-2002 and 2012-2013, the prevalence of drinking increased, as did volume and frequency of drinking and prevalence of ≥monthly HED among drinkers. Increases were greater for women than men for all measures and smaller among the formerly married for consumption among drinkers. The increase in overall drinking prevalence was magnified among all race-ethnic minorities, whereas the increase in ≥monthly HED was magnified only among Blacks (all relative to Whites). Conclusions Our findings are suggestive of a “wetter” drinking climate in 2012-2013 than in 2001-2002, indicating the need for continued and expanded efforts to prevent chronic and episodic heavy alcohol consumption. Given the across-the-board increases in alcohol consumption in recent years, policy efforts that address drinking at the population level are supported, even if specific drinking behaviors and subgroups of drinkers are additionally targeted for individualized approaches. PMID:25620731

  7. Terrorism preparedness in state health departments--United States, 2001-2003.

    Science.gov (United States)

    2003-10-31

    The anthrax attacks in fall 2001 highlighted the role of infectious disease (ID) epidemiologists in terrorism preparedness and response. Beginning in 2002, state health departments (SHDs) received approximately 1 billion dollars in new federal funding to prepare for and respond to terrorism, infectious disease outbreaks, and other public health threats and emergencies. This funding is being used in part to improve epidemiologic and surveillance capabilities. To determine how states have used a portion of their new funding to increase ID epidemiology capacity, the Iowa Department of Public Health's Center for Acute Disease Epidemiology and the Iowa State University Department of Microbiology conducted two surveys of U.S. state epidemiologists during September 2000-August 2001 and October 2002-June 2003. This report summarizes the results of these surveys, which determined that although the number of SHD epidemiology workers assigned to ID and terrorism preparedness increased by 132%, concerns remained regarding the ability of SHDs to hire qualified personnel. These findings underscore the need to develop additional and more diverse training venues for current and future ID epidemiologists.

  8. NuTEC annual report. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-03-01

    This report summarizes the educational activities and related management of the Nuclear Technology and Education Center (NuTEC) during the 2001 fiscal year. Both Tokyo and Tokai Education Centers have successfully conducted almost all the planned domestic and international training courses. In addition, Tokai Education Center has performed the 3rd nuclear supervisor training course and other courses for special nuclear emergency preparedness in response to the legal amendment after the JCO criticality accident. The sum total number of participants was 1,310. The International Technology Transfer Division has not only planned and organized the international training courses, but also taken charge of the 3rd workshop on Human Resource Development under the framework of FNCA (Forum of Nuclear Cooperation in Asia). Various researches have been made to improve the educational program. (author)

  9. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  10. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  11. Growth potential and growth factor of the IT company operating in Estonia : summary of the study conducted between August-October 2001 / Aimar Meltsa

    Index Scriptorium Estoniae

    Meltsa, Aimar

    2002-01-01

    Kaanel ajak. ilmumisaeg 2001/2002. 2001.a. läbiviidud uuringus vaadeldi Eestis infotehnoloogia vallas tegutsevaid ettevõtteid, eesmärgiga hinnata nende potentsiaalset majanduskasvu ning neid tingimusi, mis seda määravad

  12. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  13. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  14. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  15. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  16. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  17. Growth potential and growth factor of the IT company operating in Estonia : summary of the study conducted between August-October 2001 / Aimar Meltsa

    Index Scriptorium Estoniae

    Meltsa, Aimar

    2001-01-01

    Kaanel ajak. ilmumisaeg Winter 2001/2002. 2001.a. läbiviidud uuringus vaadeldi Eestis infotehnoloogia vallas tegutsevaid ettevõtteid, eesmärgiga hinnata nende potentsiaalset majanduskasvu ning neid tingimusi, mis seda määravad

  18. 33 CFR 100.1102 - Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam...

    Science.gov (United States)

    2010-07-01

    ... River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). 100.1102 Section... MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1102 Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). (a) General. Sponsors are...

  19. Záchranný předstihový výzkum v trase kanalizace na hradě Křivoklátě v roce 2001

    Czech Academy of Sciences Publication Activity Database

    Durdík, Tomáš; Kašpar, V.

    2002-01-01

    Roč. 49, - (2002), s. 25-26 ISSN 1211-992X. [Archeologické výzkumy v Čechách 2001. Praha, 03.04.2002-04.04.2002] Institutional research plan: CEZ:AV0Z8002910 Keywords : Bohemia * Middle Ages * castles Subject RIV: AC - Archeology, Anthropology, Ethnology

  20. Comparação das estimativas de prevalência de indicadores de saúde no Município de Campinas, São Paulo, Brasil, nos anos de 2001/2002 (ISA-SP e 2008/2009 (ISA-Camp Comparación de las estimaciones de prevalencia en los indicadores de salud en Campinas, São Paulo, Brasil, durante los años 2001/2002 (ISA-SP y 2008/2009 (ISA-Camp Comparison of prevalence estimates for health indicators in Campinas, São Paulo State, Brazil, in 2001-2002 (ISA-SP and 2008-2009 (ISA-Camp

    Directory of Open Access Journals (Sweden)

    Chester Luis Galvão César

    2013-06-01

    Full Text Available O objetivo do estudo foi comparar estimativas da prevalência de indicadores de saúde para adultos residentes em Campinas, São Paulo, Brasil, utilizando dados de inquéritos domiciliares realizados em diferentes períodos de tempo (ISA-SP 2001/2002 e ISA-Camp 2008/2009, com amostras de 941 e 2.637 indivíduos de 18 anos e mais, respectivamente. Variáveis sociodemográficas caracterizaram a população estudada. Foram estimadas prevalências e seus respectivos intervalos de 95% de confiança e as comparações foram realizadas pelas razões de prevalência ajustadas por sexo, idade e escolaridade, obtidas pela regressão de Poisson com variância robusta. Diferenças estatisticamente significantes foram observadas para as prevalências de: morbidade referida, uso de medicamentos, percentual dos que nunca fumaram, realização dos exames de Papanicolaou e de mamografia, alguma vez na vida. O acompanhamento de indicadores de saúde por inquéritos repetidos em uma mesma população pode facilitar o monitoramento de objetivos e metas fornecendo subsídios ao planejamento de ações em saúde.El objetivo del estudio fue comparar las estimaciones de prevalencia en los indicadores de salud para los adultos que viven en Campinas, São Paulo, Brasil, con datos de encuestas de diferentes períodos de tiempo (ISA-SP 2001/2002 y ISA-Camp 2008/2009, con muestras de 941 y 2.637 personas de 18 años y más, respectivamente. Las variables sociodemográficas caracterizaron a la población de estudio. Se estimaron la prevalencia y sus respectivos intervalos de confianza del 95% y las comparaciones se realizaron por razones de prevalencia ajustadas por sexo, edad y educación, obtenidas mediante la regresión de Poisson. Se observaron diferencias estadísticas en la prevalencia de morbilidad, uso de medicamentos, el porcentaje de quienes nunca habían fumado, la realización de citologías vaginales y mamografías, en algún momento de sus vidas. El seguimiento

  1. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be

  2. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at

  3. Rocky Mountain spotted fever in the United States, 1997-2002.

    Science.gov (United States)

    Chapman, Alice S; Murphy, Staci M; Demma, Linda J; Holman, Robert C; Curns, Aaron T; McQuiston, Jennifer H; Krebs, John W; Swerdlow, David L

    2006-01-01

    Rocky Mountain spotted fever (RMSF) is the most commonly reported fatal tick-borne disease in the United States. During 1997-2002, 3,649 cases of RMSF were reported to the Centers for Disease Control and Prevention via the National Electronic Telecommunications System for Surveillance; 2,589 case report forms, providing supplemental information, were also submitted. The average annual RMSF incidence during 1997-2002 was 2.2 cases/million persons. The annual incidence increased during 1997-2002 to a rate of 3.8 cases/million persons in 2002. The incidence was lowest among persons aged<5 and 10-29 years, and highest among adults aged 60-69 years. The overall case-fatality rate was 1.4%; the rate peaked in 1998 at 2.9% and declined to 0.7% in 2001 and 2002. Children<5 years of age had a case-fatality rate (5%) that was significantly greater than the rates for age groups<60 years of age, except for that for 40-49 years of age. Continued national surveillance is needed to assess the effectiveness of prevention efforts and early treatment in decreasing severe morbidity and mortality associated with RMSF.

  4. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  5. Regional impact of climate on Japanese encephalitis in areas located near the three gorges dam.

    Directory of Open Access Journals (Sweden)

    Yuntao Bai

    Full Text Available BACKGROUND: In this study, we aim to identify key climatic factors that are associated with the transmission of Japanese encephalitis virus in areas located near the Three Gorges Dam, between 1997 and 2008. METHODS: We identified three geographical regions of Chongqing, based on their distance from the Three Gorges Dam. Collectively, the three regions consisted of 12 districts from which study information was collected. Zero-Inflated Poisson Regression models were run to identify key climatic factors of the transmission of Japanese encephalitis virus for both the whole study area and for each individual region; linear regression models were conducted to examine the fluctuation of climatic variables over time during the construction of the Three Gorges Dam. RESULTS: Between 1997 and 2008, the incidence of Japanese encephalitis decreased throughout the entire city of Chongqing, with noticeable variations taking place in 2000, 2001 and 2006. The eastern region, which is closest to the Three Gorges Dam, suffered the highest incidence of Japanese encephalitis, while the western region experienced the lowest incidence. Linear regression models revealed that there were seasonal fluctuations of climatic variables during this period. Zero-Inflated Poisson Regression models indicated a significant positive association between temperature (with a lag of 1 and 3 months and Japanese encephalitis incidence, and a significant negative association between rainfall (with a lag of 0 and 4 months and Japanese encephalitis incidence. CONCLUSION: The spatial and temporal trends of Japanese encephalitis incidence that occurred in the City of Chongqing were associated with temperature and rainfall. Seasonal fluctuations of climatic variables during this period were also observed. Additional studies that focus on long-term data collection are needed to validate the findings of this study and to further explore the effects of the Three Gorges Dam on Japanese

  6. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities - 1996. Annual report

    International Nuclear Information System (INIS)

    Martinson, R.D.; Graves, R.J.; Mills, R.B.; Kamps, J.W.

    1997-08-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1996 The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide the FPC with species and project specific real time data from John Day and Bonneville Dams. Monitoring data collected included: river conditions; total numbers of fish; numbers of fry, adult salmon, and incidental catch; daily and seasonal passage patterns; and fish condition. 10 refs., 16 figs., 5 tabs

  7. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  8. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin Cai

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  9. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    2005-07-01

    The runoff volume for 2004 was below average throughout the Columbia Basin. At The Dalles the January-July runoff volume was 77% of average or 83.0 MAF. Grand Coulee, Hungry Horse, and Libby were below their Biological Opinion reservoir target elevations on April 10 at the beginning of the spring salmon migration season. All major storage reservoirs except Libby, Grand Coulee, Hungry Horse, Dworshak, and Brownlee were within a few feet of full by the end of June and early July. Overall, NOAA Biological Opinion seasonal flow targets were not met at any project for either spring or summer migrations of salmon and steelhead. Overall, spill was reduced in 2004. Implementation of Biological Opinion spill for fish passage measures was wrought with contention in 2004, particularly for summer spill which was finally the subject of litigation. The spring migration spill season began with debate among the fishery mangers and tribes and action agencies regarding spill at Bonneville Dam for the Spring Creek Hatchery release. The USFWS agreed to a spill test versus a corner collector operation to determine the best route for survival for these fish. The USFWS agreement includes no spill for early Spring Creek Hatchery releases for the next two years. Spring spill at Snake River transportation sites was eliminated after April 23, and transportation was maximized. The federal operators and regulators proposed to reduce Biological Opinion summer spill measures, while testing the impact of those reductions. This proposal was eventually rejected in challenges in the Federal Ninth Circuit Court. The Corps of Engineers reported that spill at Bonneville Dam in the 2002 to 2004 period was actually lower than reported due to a spill calibration error at the project. Because flows were low and spill levels were easily controlled few fish were observed with any signs of Gas Bubble Trauma. The annual Smolt Monitoring Program was implemented and provided in-season timing and passage

  10. The World Commission on Dams + 10: Revisiting the Large Dam Controversy

    Directory of Open Access Journals (Sweden)

    Deborah Moore

    2010-06-01

    Full Text Available The World Commission on Dams (WCD was an experiment in multi-stakeholder dialogue and global governance concerned with a subject area – large dams – that was fraught with conflict and controversy. The WCD Report, Dams and Development: A New Framework for Decision-Making, was published in 2000 and accompanied by hopes that broad-based agreements would be forged on how to better manage water and energy development. Ten years later, this special issue of Water Alternatives revisits the WCD and its impacts, exploring the question: Is the WCD still relevant? The editorial team and the Guest Editors of this special issue of Water Alternatives have selected a range of 20 papers, 6 viewpoints, and 4 book reviews that help to illustrate the evolution in the dams debate. The goal of this special issue is to examine the influence and the impacts of the WCD on the dam enterprise, in general, and on the policies and practices of key stakeholders and institutions, and on the development outcomes for affected communities and environments, in particular. In this introduction, the Guest Editors provide an overview of the special issue, exploring the new drivers of dam development that have emerged during the last decade, including climate change and new financiers of dams, and describing the themes emerging from this diverse set of papers and viewpoints. This special issue demonstrates the need for a renewed multi-stakeholder dialogue at multiple levels. This would not be a redo of the WCD, but rather a rekindling and redesigning of processes and forums where mutual understanding, information-sharing, and norm-setting can occur. One of the most promising developments of the last decade is the further demonstration, in case studies described here, that true partnership amongst key stakeholders can produce transformative resource-sharing agreements, showing that many of the WCD recommendations around negotiated decision making are working in practice. We hope

  11. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong; Bao, Kai; Zhang, Hui

    2011-01-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  12. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  13. Tenaga Nasional Berhad dam safety and surveillance program

    International Nuclear Information System (INIS)

    Jansen Luis; Zulkhairi Abd Talib

    2006-01-01

    This paper discusses the current practice of dam surveillance, which includes dam monitoring which is a process of visual inspections, measuring, processing, compiling and analyzing dam instrumentation data to determine the performance of a dam. The prime objective of the dam surveillance system is to ensure that any occurrence and development of safety deficiencies and problems are quickly detected, identified, analyzed and the required remedial actions are determined and consequently carried out in due time. In brief, the section is responsible to ensure that the dam monitoring and surveillance works are implemented as per scheduled and in accordance with the requirement and guidelines prepared by the dam designers and in accordance with international commission on large dams, ICOLD. The paper also illustrates and recommends an alternative approach for dam surveillance program using risk management approach, which is currently being actively adopted by some countries like USA, Canada, Australia and etc, towards improving the dam safety management and the decision making process. The approach provides a wider area of opportunity, improvements and benefits particular in the evaluation and modifications to the dam performance and safety. The process provides an effective and efficient tool for the decision makers and engineers through a comprehensive evaluation and a good understanding of the hazards, risks and consequences in relation to dam safety investigations. (Author)

  14. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  15. Proceedings of the Canadian Dam Association's 2005 annual conference : 100 years of dam experience : balancing tradition and innovation. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-09-01

    This conference provided a forum to promote discussion on improving the management and safety of dams. It featured 8 technical sessions as well as workshops to discuss dam safety guidelines and guidelines for extreme flood analyses and their applications. It also featured workshops on instrumentation and performance monitoring of dams; tailing dam closures and reclamation; and, practical approaches to emergency preparedness for dam owners. The discussions provided details on large hydropower development projects, their innovations in environmental impact assessment, mitigation, and monitoring. The conference included a technical component led by experts on dams and tailings facilities. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and safety guidelines. All 24 presentations at this conference have been catalogued separately for inclusion in this database

  16. Hydrologic Resources Management Program and Underground Test Area Project FY 2001-2002 Progress Report

    International Nuclear Information System (INIS)

    Rose, T.P.; Kersting, A.B.; Harris, L.J.; Hudson, G.B.; Smith, D.K.; Williams, R.W.; Loewen, D.R.; Nelson, E.J.; Allen, P.G.; Ryerson, F.J.; Pawloski, G.A.; Laue, C.A.; Moran, J.E.

    2003-01-01

    This report contains highlights of FY 2001 and 2002 technical studies conducted by the Analytical and Nuclear Chemistry Division (ANCD) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area (UGTA) Project. These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work emphasizes the Defense Programs goal of responsible management of natural resources at the NTS, while UGTA-funded work focuses on defining the extent of radionuclide contamination in NTS groundwater resulting from underground nuclear testing. The report is organized on a topical basis, and contains eight chapters that reflect the range of technical work performed by LLNL-ANCD in support of HRMP and UGTA. Chapter 1 describes recent hot well sampling efforts at the NTS, and presents the results of chemical and isotopic analyses of groundwater samples from six near-field wells. These include the Cambric (UE-5n), Bilby (U-3cn PS No.2), Bourbon (UE-7nS), Nash (UE-2ce), Tybo/Benham (ER-20-5 No.3), and Almendro (U-19v PS No.1ds) sites. The data generated by the hot well program is vital to the development and validation of contaminant transport models at the NTS. Chapter 2 discusses the results of xenon isotope measurements of groundwater samples from the six near-field wells described in Chapter 1. This work demonstrates that fission xenon is present in the water at levels that are readily measurable and highlights the significant differences in xenon concentrations and isotopic abundances at different sites. These differences provide insight into the early cooling history of nuclear test cavities, and may assist in predicting the distribution of the source term in the near-field environment. Chapter 3 is an investigation of the distribution

  17. Review of JT-60U experimental results in 2001 and 2002

    International Nuclear Information System (INIS)

    2003-11-01

    The results from the JT-60U experiments in 2001 and 2002 are reviewed. A high poloidal beta (β p ) H-mode plasma with full non-inductive current drive was obtained at 1.8 MA, and the fusion triple product reached 3.1x10 20 m -3 keV s. High normalized beta (β N ) around 2.7 was maintained for 7.4 s. Neoclassical tearing mode suppression by electron cyclotron current drive (ECCD) was accomplished using a real-time feedback control system, and improvement in β N was obtained. In a reversed shear plasma, a high DT-equivalent fusion gain (>0.8) was maintained for 0.55 s with a current hole. High confinement reversed shear plasmas where the electron temperature was higher than the ion temperature were obtained. A new operation scenario was established in which a plasma with high bootstrap current fraction and internal transport barriers (ITBs) was produced without using the OH coil. For physics studies of ITB formation, dedicated experiment was performed, in which the heating power was deliberately scanned. Accumulation of heavy impurity related to strong ITBs in reversed shear plasmas, and degradation of ITBs by electron cyclotron heating (ECH) in weak positive shear plasmas was found. In high β p mode plasmas, Ar exhaust by ECH was obtained. Correlation between the particle and thermal diffusivities was observed in ITB plasmas with both negative and weak shear. As for the current hole, the mechanism was investigated in detail by accurate current profile measurement and ECCD. A new type of Alfven eigenmode (Reversed shear Alfven eigenmode) was proposed, and the observed frequency chirp was explained quite well. As for ECCD, the current drive efficiency was evaluated in a reactor-relevant high electron-temperature regime. In Ar-seeded H-mode plasmas with the outer strike point located on the divertor dome-top, high-power negative-ion-based neutral beam injection (N-NBI) extended the electron density regime to 0.95 Greenwald density keeping confinement enhancement

  18. Sinkhole remediation at Swinging Bridge Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jones, A. [Devine Tarbell and Associates, Portland, ME (United States)

    2009-07-01

    This case history summary described a piping-related sinkhole that occurred after a flood at the Swinging Bridge Dam. The earth-filled embankment dam was constructed using a hydraulic fill technique. A foundation drilling and grouting program was constructed in areas of the dam founded on jointed sandstone and shale. The storage volumes of the reservoir is 32,000 acre-feet. A sinkhole 25 to 300 feet in diameter was observed on May 5, 2005 along the edge of the dam crest. The sinkhole extended to within 10 feet of the reservoir and was separated by a shallow berm of soil and driftwood. Cracking of the crest extended across an area of 180 feet. Operations staff notified the appropriate agencies, implemented a monitoring program, and mobilized construction equipment and sands for use as emergency sinkhole filler. An increase in tailrace turbidity was observed. Historical records for the dam showed significant cracking during the initial filling of the reservoir. Failure modes included increased pore pressures and seepages resulting in the piping of soil along the outside of the dam conduit. Emergency repairs included chemical grouting and weld repairs in the penstocks. A Federal Emergency Management Agency (FEMA) is currently addressing safety issues associated with conduits through dams. 4 refs., 11 figs.

  19. Evaluation of the Life History of Native Salmonids in the Malheur River Basin; Cooperative Bull Trout/Redband Trout Research Project, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Alan; Soupir, Jim (US Forest Service, Prairie City Ranger District, Prairie City, OR); Schwabe, Lawrence (Burns Paiute Tribe, Department of Fish and Wildlife, Burns, OR)

    2003-08-01

    The Malheur River is a 306-kilometer tributary to the Snake River, which drains 12,950 square kilometers. The Malheur River originates in the Blue Mountains and flows into the Snake River near Ontario, Oregon. The climate of the basin is characterized by hot dry summers, occasionally exceeding 38 C, and cold winters that may drop below -29 C. Average annual precipitation is 30 centimeters in the lower reaches. Wooded areas consist primarily of mixed fir and pine forest in the higher elevations. Sagebrush and grass communities dominate the flora in the lower elevations. Efforts to document salmonid life histories, water quality, and habitat conditions have continued in fiscal year 2002. Bull trout Salvelinus confluentus are considered to be cold water species and are temperature-dependant. Due to the interest of bull trout from various state and Federal agencies, a workgroup was formed to develop project objectives related to bull trout. Table 1 lists individuals that participated in the 2002 work group. This report will reflect work completed during the Bonneville Power Administration contract period starting April 1, 2002, and ending March 31, 2003. All tasks were conducted within this timeframe, and a more detailed timeframe may be referred to in each individual report.

  20. The energy world in 2002. Statistical yearbook ENERDATA 2003

    International Nuclear Information System (INIS)

    2003-01-01

    This document summarizes the world energy key data for 2002 (total energy consumption and per gross domestic product unit, petroleum, gas, coal and lignite, and electric power consumptions, CO 2 emissions). Data are grouped according to five main areas (Africa and Middle East, America, Asia and Pacific area, Western Europe, Eastern Europe and ex-USSR). The data show a restart of the world energy consumption (1.4% in 2002 with respect to 0.5% in 2001) despite a relatively low economic growth (1.6% with respect to 2.6% for the previous decade, as an average), a strong growth of the electricity and coal consumption, a restart of the gas consumption and a stagnation of the petroleum consumption. (J.S.)

  1. Pine Creek Ranch, FY 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Berry, Mark E.

    2001-11-01

    Pine Creek Ranch was purchased in 1999 by the Confederated Tribes of Warm Springs using Bonneville Power Administration Fish and Wildlife Habitat Mitigation funds. The 25,000 acre property will be managed in perpetuity for the benefit of fish and wildlife habitat. Major issues include: (1) Restoring quality spawning and rearing habitat for stealhead. Streams are incised and fish passage barriers exist from culverts and possibly beaver dams. In addition to stealhead habitat, the Tribes are interested in overall riparian recovery in the John Day River system for wildlife habitat, watershed values and other values such as recreation. (2) Future grazing for specific management purposes. Past grazing practices undoubtedly contributed to current unacceptable conditions. The main stem of Pine Creek has already been enrolled in the CREP program administered by the USDA, Natural Resource Conservation Service in part because of the cost-share for vegetation restoration in a buffer portion of old fields and in part because of rental fees that will help the Tribes to pay the property taxes. Grazing is not allowed in the riparian buffer for the term of the contract. (3) Noxious weeds are a major concern. (4) Encroachment by western juniper throughout the watershed is a potential concern for the hydrology of the creek. Mark Berry, Habitat Manager, for the Pine Creek Ranch requested the Team to address the following objectives: (1) Introduce some of the field staff and others to Proper Functioning Condition (PFC) assessments and concepts. (2) Do a PFC assessment on approximately 10 miles of Pine Creek. (3) Offer management recommendations. (4) Provide guidelines for monitoring.

  2. Dynamic tests at the Outardes 3 dam

    International Nuclear Information System (INIS)

    Proulx, J.; Paultre, P.; Duron, Z.; Tai Mai Phat; Im, O.

    1992-01-01

    At the Outardes 3 gravity dam, part of the Manicouagan-Outardes hydroelectric complex in northeastern Quebec, forced vibration tests were carried out using an eccentric mass shaker attached to the dam crest at three different locations. Accelerations were measured along the crest and in the inspection galleries, and hydrodynamic pressures were measured along the upstream dam face and at various locations in the reservoir. The tests were designed to analyze the effects of gravity dam-reservoir interactions and to generate a data base for calibrating finite element models used in studying the dynamic behavior of gravity dams. Experimental results are presented in order to demonstrate the quality of the data obtained and the effectiveness of the experimental procedures. Modes of vibration were observed which corresponded to those obtained by finite element analysis. It is shown that techniques recently developed for dynamic tests on large dams can be successfully used on gravity dams. 3 refs., 6 figs

  3. Modeling the capacity of riverscapes to support beaver dams

    Science.gov (United States)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed

  4. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2003-06-30

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies

  5. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  6. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun Xiong

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  7. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  8. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    2009-05-26

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries

  9. Dam Design can Impede Adaptive Management of Environmental Flows: A Case Study from the Opuha Dam, New Zealand

    Science.gov (United States)

    Lessard, JoAnna; Murray Hicks, D.; Snelder, Ton H.; Arscott, David B.; Larned, Scott T.; Booker, Doug; Suren, Alastair M.

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m3 s-1 only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m3 s-1 (compared to 19 times >100 m3 s-1 and 6 times >203 m3 s-1 in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.

  10. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian|info:eu-repo/dai/nl/411261487; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  11. Performance of a surface bypass structure to enhance juvenile steelhead passage and survival at Lower Granite Dam, Washington

    Science.gov (United States)

    Adams, Noah S.; Plumb, John M.; Perry, Russell W.; Rondorf, Dennis W.

    2014-01-01

    An integral part of efforts to recover stocks of Pacific salmon Oncorhynchus spp. and steelhead O. mykiss in Pacific Northwest rivers is to increase passage efficacy and survival of juveniles past hydroelectric dams. As part of this effort, we evaluated the efficacy of a prototype surface bypass structure, the removable spillway weir (RSW), installed in a spillbay at Lower Granite Dam, Washington, on the Snake River during 2002, 2003, 2005, and 2006. Radio-tagged juvenile steelhead were released upstream from the dam and their route of passage through the turbines, juvenile bypass, spillway, or RSW was recorded. The RSW was operated in an on-or-off condition and passed 3–13% of the total discharge at the dam when it was on. Poisson rate models were fit to the passage counts of hatchery- and natural-origin juvenile steelhead to predict the probability of fish passing the dam. Main-effect predictor variables were RSW operation, diel period, day of the year, proportion of flow passed by the spillway, and total discharge at the dam. The combined fish passage through the RSW and spillway was 55–85% during the day and 37–61% during the night. The proportion of steelhead passing through nonturbine routes was 95% when the RSW was on during the day. The ratio of the proportion of steelhead passed to the proportion of water passing the RSW was from 6.3:1 to 10.0:1 during the day and from 2.7:1 to 5.2:1 during the night. Steelhead passing through the RSW exited the tailrace about 15 min faster than fish passing through the spillway. Mark–recapture single-release survival estimates for steelhead passing the RSW ranged from 0.95 to 1.00. The RSW appeared to be an effective bypass structure compared with other routes of fish passage at the dam.

  12. Factors influencing hysteresis characteristics of concrete dam deformation

    Directory of Open Access Journals (Sweden)

    Jia-he Zhang

    2017-04-01

    Full Text Available Thermal deformation of a concrete dam changes periodically, and its variation lags behind the air temperature variation. The lag, known as the hysteresis time, is generally attributed to the low velocity of heat conduction in concrete, but this explanation is not entirely sufficient. In this paper, analytical solutions of displacement hysteresis time for a cantilever beam and an arch ring are derived. The influence of different factors on the displacement hysteresis time was examined. A finite element model was used to verify the reliability of the theoretical analytical solutions. The following conclusions are reached: (1 the hysteresis time of the mean temperature is longer than that of the linearly distributed temperature difference; (2 the dam type has a large impact on the displacement hysteresis time, and the hysteresis time of the horizontal displacement of an arch dam is longer than that of a gravity dam; (3 the reservoir water temperature variation lags behind of the air temperature variation, which intensifies the differences in the horizontal displacement hysteresis time between the gravity dam and the arch dam; (4 with a decrease in elevation, the horizontal displacement hysteresis time of a gravity dam tends to increase, whereas the horizontal displacement hysteresis time of an arch dam is likely to increase initially, and then decrease; and (5 along the width of the dam, the horizontal displacement hysteresis time of a gravity dam decreases as a whole, while the horizontal displacement hysteresis time of an arch dam is shorter near the center and longer near dam surfaces.

  13. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  14. 76 FR 56167 - Marine Mammals; Pinniped Removal Authority

    Science.gov (United States)

    2011-09-12

    ... problem interactions. See http://www.nwr.noaa.gov/Marine-Mammals/Seals-and-Sea-Lions/Sec-120-Authority.cfm... to the pinniped predation problem at Bonneville Dam and is not a na[iuml]ve animal that can be driven... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA681 Marine...

  15. Tucannon River Spring Chinook Salmon Captive Broodstock Program, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Gallinat, Michael; Varney, Michelle

    2003-05-01

    This report summarizes the objectives, tasks, and accomplishments of the Tucannon River Spring Chinook Captive Broodstock Program during 2002. The WDFW initiated a captive broodstock program in 1997. The overall goal of the Tucannon River captive broodstock program is for the short-term, and eventually long-term, rebuilding of the Tucannon River spring chinook salmon run, with the hope that natural production will sustain itself. The project goal is to rear captive salmon selected from the supplementation program to adults, spawn them, rear their progeny, and release approximately 150,000 smolts annually into the Tucannon River between 2003-2007. These smolt releases, in combination with the current hatchery supplementation program (132,000 smolts) and wild production, are expected to produce 600-700 returning adult spring chinook to the Tucannon River each year from 2005-2010. The captive broodstock program collected fish from five (1997-2001) brood years (BY). As of January 1, 2003, WDFW has approximately 11 BY 1998, 194 BY 1999, 314 BY 2000, 447 BY 2001, and 300 BY 2002 (for extra males) fish on hand at LFH. The 2002 eggtake from the 1997 brood year (Age 5) was 13,176 eggs from 10 ripe females. Egg survival was 22%. Mean fecundity based on the 5 fully spawned females was 1,803 eggs/female. The 2002 eggtake from the 1998 brood year (Age 4) was 143,709 eggs from 93 ripe females. Egg survival was 29%. Mean fecundity based on the 81 fully spawned females was 1,650 eggs/female. The 2002 eggtake from the 1999 brood year (Age 3) was 19,659 eggs from 18 ripe females. Egg survival was 55%. Mean fecundity based on the 18 fully spawned fish was 1,092 eggs/female. The total 2002 eggtake from the captive brood program was 176,544 eggs. A total of 120,833 dead eggs (68%) were removed with 55,711 live eggs remaining for the program. As of May 1, 2003 we had 46,417 BY 2002 captive brood progeny on hand A total of 20,592 excess BY 01 fish were marked as parr (AD/CWT) and

  16. Salmon Supplementation Studies in Idaho Rivers; Idaho Supplementation Studies, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beasley, Chris; Tabor, R.A.; Kinzer, Ryan (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

    2003-04-01

    This report summarizes brood year 1999 juvenile production and emigration data and adult return information for 2000 for streams studied by the Nez Perce Tribe for the cooperative Idaho Salmon Supplementation Studies in Idaho Rivers (ISS) project. In order to provide inclusive juvenile data for brood year 1999, we include data on parr, presmolt, smolt and yearling captures. Therefore, our reporting period includes juvenile data collected from April 2000 through June 2001 for parr, presmolts, and smolts and through June 2002 for brood year 1999 yearling emigrants. Data presented in this report include; fish outplant data for treatment streams, snorkel and screw trap estimates of juvenile fish abundance, juvenile emigration profiles, juvenile survival estimates to Lower Granite Dam (LGJ), redd counts, and carcass data. There were no brood year 1999 treatments in Legendary Bear or Fishing Creek. As in previous years, snorkeling methods provided highly variable population estimates. Alternatively, rotary screw traps operated in Lake Creek and the Secesh River provided more precise estimates of juvenile abundance by life history type. Juvenile fish emigration in Lake Creek and the Secesh River peaked during July and August. Juveniles produced in this watershed emigrated primarily at age zero, and apparently reared in downstream habitats before detection as age one or older fish at the Snake and Columbia River dams. Over the course of the ISS study, PIT tag data suggest that smolts typically exhibit the highest relative survival to Lower Granite Dam (LGJ) compared to presmolts and parr, although we observed the opposite trend for brood year 1999 juvenile emigrants from the Secesh River. SURPH2 survival estimates for brood year 1999 Lake Creek parr, presmolt, and smolt PIT tag groups to (LGJ) were 27%, 39%, and 49% respectively, and 14%, 12%, and 5% for the Secesh River. In 2000, we counted 41 redds in Legendary Bear Creek, 4 in Fishing Creek, 5 in Slate Creek, 153 in the

  17. Agrice 2002. Activity report

    International Nuclear Information System (INIS)

    2002-01-01

    Renewable raw materials derived from agricultural crops are used to manufacture bio-products in energy, chemicals and materials industries. Renewable feedstocks address a double need. On the one hand, they offer alternatives to fossil resources, and on the other hand, they are a response to today's environmental challenges: mitigation of the greenhouse affect, reduction of air, soil and water pollution, innocuousness and biodegradability of products. A new chemistry must be created. Large-scale and ongoing research work must be committed to this goal. The research effort implies active coordination of all the various actors involved - multidisciplinary research teams, agro-industrial enterprises, user industries (petrochemicals, chemicals, materials), and specific agricultural branches. With these ends in mind the scientific interest group AGRICE - Agriculture for Chemicals and Energy - was established by public authorities and eight partners in France in 1994. The AGRICE consortium was renewed for six years in 2001, with a broader membership base. AGRICE now includes the following partners: - the research arms of the Commissariat a l'Energie Atomique (CEA), the Institut Francais du Petrole (IFP), and the Institut National de Recherche Agronomique (INRA), - professional organisations representing producers of oilseeds (ONIDOL), grains (AGPB) and beets (CGB), - corporate members ATOFINA, AUTOBAR PACKAGING France, BAYER CROP SCIENCE, CERESTAR France, LIMAGRAIN Agro-Industrie, RHODIA, TOTAL FINA ELF, - the French ministries of Agriculture, Industry, Research, and the Environment, - the French Agency for the Environment and Energy Management (ADEME), - the French Agency for Innovation (ANVAR). ADEME is responsible for managing AGRICE. The consortium is involved in major international undertakings, notably through the European Renewable Resources and Materials Association (ERRMA). This report presents: 1 - the AGRICE profile, scope of activity, structure and Operations

  18. Prevalence of genotypic HIV-1 drug resistance in Thailand, 2002

    Directory of Open Access Journals (Sweden)

    Watitpun Chotip

    2003-03-01

    Full Text Available Abstract Background The prices of reverse transcriptase (RT inhibitors in Thailand have been reduced since December 1, 2001. It is expected that reduction in the price of these inhibitors may influence the drug resistance mutation pattern of HIV-1 among infected people. This study reports the frequency of HIV-1 genetic mutation associated with drug resistance in antiretroviral-treated patients from Thailand. Methods Genotypic resistance testing was performed on samples collected in 2002 from 88 HIV-1 infected individuals. Automated DNA sequencing was used to genotype the HIV-1 polymerase gene isolated from patients' plasma. Results Resistance to protease inhibitors, nucleoside and non-nucleoside reverse transcriptase inhibitors were found in 10 (12%, 42 (48% and 19 (21% patients, respectively. The most common drug resistance mutations in the protease gene were at codon 82 (8%, 90 (7% and 54 (6%, whereas resistant mutations at codon 215 (45%, 67 (40%, 41 (38% and 184 (27% were commonly found in the RT gene. This finding indicates that genotypic resistance to nucleoside reverse transcriptase inhibitors was prevalent in 2002. The frequency of resistant mutations corresponding to non-nucleoside reverse transcriptase inhibitors was three times higher-, while resistant mutation corresponding to protease inhibitors was two times lower than those frequencies determined in 2001. Conclusion This study shows that the frequencies of RT inhibitor resistance mutations have been increased after the reduction in the price of RT inhibitors since December 2001. We believe that this was an important factor that influenced the mutation patterns of HIV-1 protease and RT genes in Thailand.

  19. Human Leptospirosis Trends: Northeast Thailand, 2001–2012

    Directory of Open Access Journals (Sweden)

    Wilawan Thipmontree

    2014-08-01

    Full Text Available The objective of this study was to determine the changing trend of leptospirosis over time in Thailand using two prospective hospital-based studies conducted amongst adult patients with acute undifferentiated fever (AUFI admitted to Maharat Nakhon Ratchasima Hospital, Nakhon Ratchasima Province, Thailand between July 2001 to December 2002 and between July 2011 to December 2012. During the first period, leptospirosis (98 patients, 40% and scrub typhus (59 patients, 24.1% were the two major causes of AUFI. In the second period, scrub typhus (137 patients, 28.3% was found to be more common than leptospirosis (61 patients, 12.7%. Amongst patients with leptospirosis, the proportion of male patients and the median age were similar. Leptospira interrogans serogroup Autumnalis was the major infecting serogroup in both study periods. The case fatality rate of leptospirosis was significantly higher in 2011–2012 as compared with the case fatality rate in 20012002 (19.7% vs. 6.3%, p < 0.001. In summary, we found that number of leptospirosis cases had decreased over time. This trend is similar to reportable data for leptospirosis complied from passive surveillance by the Ministry of Public Health, Thailand. However, the case fatality rate of severe leptospirosis has increased. Severe lung hemorrhage associated with leptospirosis remained the major cause of death.

  20. Outlook 2002

    International Nuclear Information System (INIS)

    Lunan, D.

    2002-01-01

    In 2000-2001, energy prices increased dramatically, but since that time, the price of oil decreased by approximately 33 per cent, while natural gas saw a decrease greater than 66 per cent. Takeovers in the Canadian oil and gas industry multiplied. The early results published in 2002 concerning drilling statistics and quarterly corporate financial statements look bleak when compared with those of one year ago. The author discussed the situation with a panel of experts drawn from a variety of sources: the president of the Canadian Association of Petroleum producers, the chairman of the Canadian Association of Geophysical Contractors, the senior vice-president of global energy at the Canadian Energy Research Institute, the president of the Canadian Association of Oilwell Drilling Contractors, the president of the Petroleum Services Association of Canada, and the chairman of the Small Explorers and Producers Association of Canada. Each panelist identified what they considered the top issues for 2002, the key developments, and whether the national energy strategy of the United States was still considered a top priority. The members indicated that they were not of the opinion that there is a looming downturn in oil and gas prices. They also discussed the issue of federal government leadership as it relates to domestic energy policy. Investments in the industry were discussed, also touching on the topic of mergers. Finally, they offered their opinion concerning the deregulation of the electricity market in Alberta and the effect it has had on the industry. 3 figs

  1. A lei de responsabilidade fiscal e seus mecanismos de transparência na gestão pública: um estudo de caso na prefeitura municipal do Recife (exercícios de 2001 e 2002)

    OpenAIRE

    RODRIGUES, Vânia Pereira Cavalcanti

    2004-01-01

    Este trabalho tem como eixo central a análise dos instrumentos utilizados pelo município do Recife que contribuem para uma maior transparência à gestão pública durante os exercícios de 2001 e 2002, a partir das regras inseridos na Lei de Responsabilidade Fiscal LRF (Lei Complementar nº 101, de 04 de maio de 2000). A escolha desse município se deve ao fato de que além da gestão atual proclamar a transparência em seu governo, é o município que despende maiores recursos orçament...

  2. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  3. Large Dam Effects on Flow Regime and Hydraulic Parameters of river (Case study: Karkheh River, Downstream of Reservoir Dam

    Directory of Open Access Journals (Sweden)

    Farhang Azarang

    2017-06-01

    Full Text Available Introduction: The critical role of the rivers in supplying water for various needs of life has led to engineering identification of the hydraulic regime and flow condition of the rivers. Hydraulic structures such dams have inevitable effects on their downstream that should be well investigated. The reservoir dams are the most important hydraulic structures which are the cause of great changes in river flow conditions. Materials and Methods: In this research, an accurate assessment was performed to study the flow regime of Karkheh river at downstream of Karkheh Reservoir Dam as the largest dam in Middle East. Karkheh River is the third waterful river of Iran after Karun and Dez and the third longest river after the Karun and Sefidrud. The Karkheh Dam is a large reservoir dam built in Iran on the Karkheh River in 2000. The Karkheh Reservoir Dam is on the Karkheh River in the Northwestern Khouzestan Province, the closest city being Andimeshk to the east. The part of Karkheh River, which was studied in this research is located at downstream of Karkheh Reservoir Dam. This interval is approximately 94 km, which is located between PayePol and Abdolkhan hydrometric stations. In this research, 138 cross sections were used along Karkheh River. Distance of cross sections from each other was 680m in average. The efficient model of HEC-RAS has been utilized to simulate the Karkheh flow conditions before and after the reservoir dam construction using of hydrometric stations data included annually and monthly mean discharges, instantaneous maximum discharges, water surface profiles and etc. Three defined discharges had been chosen to simulate the Karkheh River flow; maximum defined discharge, mean defined discharge and minimum defined discharge. For each of these discharges values, HEC-RAS model was implemented as a steady flow of the Karkheh River at river reach of study. Water surface profiles of flow, hydraulic parameters and other results of flow regime in

  4. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  5. Job-based health benefits in 2002: some important trends.

    Science.gov (United States)

    Gabel, Jon; Levitt, Larry; Holve, Erin; Pickreign, Jeremy; Whitmore, Heidi; Dhont, Kelley; Hawkins, Samantha; Rowland, Diane

    2002-01-01

    Based on a national survey of 2,014 randomly selected public and private firms with three or more workers, this paper reports changes in employer-based health insurance from spring 2001 to spring 2002. The cost of health insurance rose 12.7 percent, the highest rate of growth since 1990. Employee contributions for health insurance rose in 2002, from $30 to $38 for single coverage and from $150 to $174 for family coverage. Deductibles and copayments rose also, and employers adopted formularies and three-tier cost-sharing formulas to control prescription drug expenses. PPO and HMO enrollment rose, while the percentage of small employers offering health benefits fell. Because increasing claims expenses rather than the underwriting cycle are the major driver of rising premiums, double-digit growth appears likely to continue.

  6. Measuring and managing safety at Wahleach Dam

    International Nuclear Information System (INIS)

    Salmon, G. M.; Cattanach, J. D.; Hartford, D. N. D.

    1996-01-01

    Safety improvements recently implemented at the Wahleach Dam were described as one of the first instances in international dam safety practice where risk concepts have been used in conjunction with acceptable risk criteria to evaluate safety of a dam relative to required level of safety. Erosion was identified as the greatest threat to the safety of the dam. In addressing the deficiencies B.C. Hydro formulated a process which advocates a balanced level of safety,i.e. the probability of failure multiplied by the consequences of failure, integrated over a range of initiators. If the risk posed by the dam is lower than a 'tolerable' risk, the dam is considered to be safe enough. In the case of the Wahleach Dam, the inflow design flood (IDF) was selected to be about one half of the probable maximum flow (PMF), hence it was more likely than not that the spillway could pass floods up to and including the PMF. By accepting the determined level of risk, expenditures of several million dollars for design and construction of dam safety improvements were made redundant. Another byproduct of this new concept of risk assessment was the establishment of improved life safety protection by means of an early warning system for severe floods through the downstream community and emergency authorities. 3 refs., 5 tabs

  7. INIS Progress and Activity Report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Highlights of INIS Activities 2001: The International Nuclear Information System (INIS) collects and distributes scientific information in all areas of nuclear science and technology published in Member States, including bibliographic data and the full text of documents - reports, dissertations, etc. - which are not readily available through commercial channels (the non-conventional literature, NCL). Membership: In 2001, the number of participating members was 122 and included 103 countries and 19 international organisations. Bibliographic Database: INIS was able to augment the level and maintain the quality of input into the Bibliographic Database in 2001. A total of 69 391 records were added to the database, an increase of 3 677 records from 2000. There are now 2 283 882 records in the INIS database. This includes 6 170 bibliographic records prepared as voluntary contribution by INIS Members2 (including electronic journals and 657 records of British Library NCL) and 8 111 records prepared by the INIS Secretariat (3 929 IAEA and UN documents, along with 4 182 electronic records and NCL documents from the British Library). The Agency signed an agreement with Elsevier Science BV for the acquisition of electronic bibliographic records. These records will be upgraded to INIS standards and added to the collection of articles from core scientific journals. INIS Members from the Netherlands, the United Kingdom, the USA and Ireland directly funded this project. Data has been delivered in December 2001, and processing started in 2002. As of the end of 2001, there were a total of 128 paid and free subscriptions to the INIS Database on the Internet, for a total of 70 068 authorised users. This is a significant increase from last year. The INIS Database on CD-ROM had 438 paid and free subscriptions.

  8. INIS Progress and Activity Report 2001

    International Nuclear Information System (INIS)

    2002-01-01

    Highlights of INIS Activities 2001: The International Nuclear Information System (INIS) collects and distributes scientific information in all areas of nuclear science and technology published in Member States, including bibliographic data and the full text of documents - reports, dissertations, etc. - which are not readily available through commercial channels (the non-conventional literature, NCL). Membership: In 2001, the number of participating members was 122 and included 103 countries and 19 international organisations. Bibliographic Database: INIS was able to augment the level and maintain the quality of input into the Bibliographic Database in 2001. A total of 69 391 records were added to the database, an increase of 3 677 records from 2000. There are now 2 283 882 records in the INIS database. This includes 6 170 bibliographic records prepared as voluntary contribution by INIS Members2 (including electronic journals and 657 records of British Library NCL) and 8 111 records prepared by the INIS Secretariat (3 929 IAEA and UN documents, along with 4 182 electronic records and NCL documents from the British Library). The Agency signed an agreement with Elsevier Science BV for the acquisition of electronic bibliographic records. These records will be upgraded to INIS standards and added to the collection of articles from core scientific journals. INIS Members from the Netherlands, the United Kingdom, the USA and Ireland directly funded this project. Data has been delivered in December 2001, and processing started in 2002. As of the end of 2001, there were a total of 128 paid and free subscriptions to the INIS Database on the Internet, for a total of 70 068 authorised users. This is a significant increase from last year. The INIS Database on CD-ROM had 438 paid and free subscriptions

  9. The 2002 Test Beam DAQ

    CERN Multimedia

    Mapelli, L.

    The ATLAS Tilecal group has been the first user of the Test Beam version of the DAQ/EF-1 prototype in 2000. The prototype was successfully tested in lab in summer 1999 and it has been officially adopted as baseline solution for the Test Beam DAQ at the end of 1999. It provides the right solution for users who need to have a modern data acquisition chain for final or almost final front-end and off-detector electronics (RODs and ROD emulators). The typical architecture for the readout and the DAQ is sketched in the figure below. A number of detector crates can send data over the Read Out Link to the Read Out System. The Read Out System sends data over an Ethernet link to a SubFarm PC that provides to send the data to Central Data Recording. In 2001 also the Muon MDT group has adopted this modern DAQ where for the first time a PC-based ReadOut System has been used, instead of the VME based implementation used in 2000, and for the Tilecal DAQ in 2001. In 2002 also Tilecal has adopted the PC-based implement...

  10. Walla Walla River Fish Passage Operations Program, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, Brian C. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2004-02-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow measures, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2000-2001 project year, there were 624 summer steelhead (Oncorhynchus mykiss), 24 bull trout (Salvelinus confluentus), and 47 spring chinook (O. tshawytscha) counted at the Nursery Bridge Dam adult trap between December 27, 2000 and June 7, 2001. The Little Walla Walla River juvenile trap was not operated this year. The project transported 1600 adult spring chinook from Ringold Springs Hatchery to the South Fork Walla Walla Brood Holding Facility and outplanted 1156 for natural spawning in the basin. The project also provided equipment for transportation of juveniles captured during the construction fish salvage at Nursery Bridge Dam.

  11. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  12. Re-Introduction of Lower Columbia River Chum Salmon into Duncan Creek, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hillson, Todd D. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-10-15

    The National Marine Fisheries Service (NMFS) listed Lower Columbia River chum as threatened under the auspices of the Endangered Species Act (ESA) in March of 1999 (64 FR 14508, March 25, 1999). The listing was in response to reduction in abundance from historical levels of more than half a million returning adults to fewer than 10,000 present day spawners. Harvest, loss of habitat, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for the decline of Columbia River chum salmon. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Currently, only two main populations are recognized as genetically distinct in the Columbia River, although spawning has been documented in most lower Columbia River tributaries. The first is located in the Grays River (RKm 34) (Grays population), a tributary of the Columbia, and the second is a group of spawners that utilize the Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks (Lower Gorge population). A possible third population of mainstem spawners, found in the fall of 1999, were located spawning above the I-205 bridge (approximately RKm 182), this aggregation is referred to as the Woods Landing/Rivershore population or the I-205 group. The recovery strategy for Lower Columbia River (LCR) chum as outlined in Hatchery Genetic Management Plans (HGMP) has three main tasks. First, determine if remnant populations of LCR chum salmon exist in LCR tributaries. Second, if such populations exist, develop stock-specific recovery plans involving habitat restoration including the creation of

  13. Estimating accumulation rates and physical properties of sediment behind a dam: Englebright Lake, Yuba River, northern California

    Science.gov (United States)

    Snyder, Noah P.; Rubin, David M.; Alpers, Charles N.; Childs, Jonathan R.; Curtis, Jennifer A.; Flint, Lorraine E.; Wright, Scott A.

    2004-01-01

    Studies of reservoir sedimentation are vital to understanding scientific and management issues related to watershed sediment budgets, depositional processes, reservoir operations, and dam decommissioning. Here we quantify the mass, organic content, and grain-size distribution of a reservoir deposit in northern California by two methods of extrapolating measurements of sediment physical properties from cores to the entire volume of impounded material. Englebright Dam, completed in 1940, is located on the Yuba River in the Sierra Nevada foothills. A research program is underway to assess the feasibility of introducing wild anadromous fish species to the river upstream of the dam. Possible management scenarios include removing or lowering the dam, which could cause downstream transport of stored sediment. In 2001 the volume of sediments deposited behind Englebright Dam occupied 25.5% of the original reservoir capacity. The physical properties of this deposit were calculated using data from a coring campaign that sampled the entire reservoir sediment thickness (6–32 m) at six locations in the downstream ∼3/4 of the reservoir. As a result, the sediment in the downstream part of the reservoir is well characterized, but in the coarse, upstream part of the reservoir, only surficial sediments were sampled, so calculations there are more uncertain. Extrapolation from one-dimensional vertical sections of sediment sampled in cores to entire three-dimensional volumes of the reservoir deposit is accomplished via two methods, using assumptions of variable and constant layer thickness. Overall, the two extrapolation methods yield nearly identical estimates of the mass of the reservoir deposit of ∼26 × 106 metric tons (t) of material, of which 64.7–68.5% is sand and gravel. Over the 61 year reservoir history this corresponds to a maximum basin-wide sediment yield of ∼340 t/km2/yr, assuming no contribution from upstream parts of the watershed impounded by other dams. The

  14. Stability of earth dam with a vertical core

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2016-01-01

    Full Text Available Earth dam with impervious element in the form of asphaltic concrete core is currently the most promising type of earth dams (due to simple construction technology and universal service properties of asphaltic concrete and is widely used in the world. However, experience in the construction and operation of high dams (above 160 m is not available, and their work is scarcely explored. In this regard, the paper discusses the results of computational prediction of the stress-strain state and stability of a high earth dam (256 m high with the core. The authors considered asphaltic concrete containing 7 % of bitumen as the material of the core. Gravel was considered as the material of resistant prisms. Design characteristics of the rolled asphaltic concrete and gravel were obtained from the processing of the results of triaxial tests. The calculations were performed using finite element method in elastoplastic formulation and basing on the phased construction of the dam and reservoir filling. The research shows, that the work of embankment dam with vertical core during filling of the reservoir is characterized by horizontal displacement of the lower resistant prism in the tailrace and the formation of a hard wedge prism descending along the core in the upper resistant prism. The key issue of the safety assessment is to determine the safety factor of the overall stability of the dam, for calculation of which the destruction of the earth dam is necessary, which can be done by reducing the strength properties of the dam materials. As a results of the calculations, the destruction of the dam occurs with a decrease in the strength characteristics of the materials of the dam by 2.5 times. The dam stability depends on the stability of the lower resistant prism. The destruction of its slope occurs on the classical circular-cylindrical surface. The presence of a potential collapse surface in the upper resistant prism (on the edges of the descending wedge does

  15. The changing hydrology of a dammed Amazon

    Science.gov (United States)

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  16. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  17. Salmon Supplementation Studies in Idaho Rivers; Field Activities Conducted on Clear and Pete King Creeks, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bretz, Justin K.; Olson, Jill M. (US Fish and Wildlife Service, Idaho Fishery Resource Office, Ahsahka, ID)

    2003-03-01

    In 2002 the Idaho Fisheries Resource Office continued working as a cooperator on the Salmon Supplementation Studies in Idaho Rivers (ISS) project on Pete King and Clear creeks. Data relating to supplementation treatment releases, juvenile sampling, juvenile PIT tagging, broodstock spawning and rearing, spawning ground surveys, and snorkel surveys were used to evaluate the project data points and augment past data. Supplementation treatments included the release of 51,329 left ventral-clipped smolts into Clear Creek (750 were PIT tagged), and 12,000 unmarked coded-wire tagged parr into Pete King Creek (998 were PIT tagged). Using juvenile collection methods, Idaho Fisheries Resource Office staff PIT tagged and released 579 naturally produced spring chinook juveniles in Clear Creek, and 54 on Pete King Creek, for minimum survival estimates to Lower Granite Dam. For Clear Creek, minimum survival estimates to Lower Granite Dam of hatchery produced supplementation and naturally produced PIT tagged smolts, were 36.0%, and 53.1%, respectively. For Pete King Creek, minimum survival estimates to Lower Granite Dam, of hatchery produced supplementation smolts and naturally produced smolts PIT tagged as parr and presmolts, were 18.8%, and 8.3%, respectively. Adults collected for broodstock in 2002 represented the final adult broodstock group collected for the ISS project. Twenty-six ventral clipped, and 28 natural adult spring chinook were transported above the weir. Monitoring and evaluation of spawning success was continued on Clear and Pete King creeks. A total of 69 redds were counted and 79 carcasses were recovered on Clear Creek. Two redds were observed and no carcasses were collected on Pete King Creek.

  18. Post-wildfire recovery of water yield in the Sydney Basin water supply catchments: An assessment of the 2001/2002 wildfires

    Science.gov (United States)

    Heath, J. T.; Chafer, C. J.; van Ogtrop, F. F.; Bishop, T. F. A.

    2014-11-01

    Wildfire is a recurring event which has been acknowledged by the literature to impact the hydrological cycle of a catchment. Hence, wildfire may have a significant impact on water yield levels within a catchment. In Australia, studies of the effect of fire on water yield have been limited to obligate seeder vegetation communities. These communities regenerate from seed banks in the ground or within woody fruits and are generally activated by fire. In contrast, the Sydney Basin is dominated by obligate resprouter communities. These communities regenerate from fire resistant buds found on the plant and are generally found in regions where wildfire is a regular occurrence. The 2001/2002 wildfires in the Sydney Basin provided an opportunity to investigate the impacts of wildfire on water yield in a number of catchments dominated by obligate resprouting communities. The overall aim of this study was to investigate whether there was a difference in water yield post-wildfire. Four burnt subcatchments and 3 control subcatchments were assessed. A general additive model was calibrated using pre-wildfire data and then used to predict post-wildfire water yield using post-wildfire data. The model errors were analysed and it was found that the errors for all subcatchments showed similar trends for the post-wildfire period. This finding demonstrates that wildfires within the Sydney Basin have no significant medium-term impact on water yield.

  19. Tuberculin skin reactivity after neonatal BCG vaccination in preterm infants in Minas Gerais, Brazil, 2001-2002 Reactividad cutánea a la tuberculina tras la vacunación con BCG de neonatos prematuros en Minas Gerais, Brasil, 2001-2002

    Directory of Open Access Journals (Sweden)

    Paulo Camargos

    2006-06-01

    Full Text Available OBJECTIVES: The efficacy of BCG vaccination in preterm babies is unknown, and available data on conversion rates to tuberculin in this age group are scarce and controversial. This study assessed the tuberculin response in preterm infants after BCG vaccination. METHODS: This randomized cohort study was carried out at the Neonatal Department, University Hospital, Federal University of Minas Gerais in Brazil during 2001 and 2002. The BCG vaccine was administered at birth to 65 full-term (control and 40 preterm newborns. All of them were tested with 5 tuberculin units of purified protein derivative-S approximately 3 months after vaccination. RESULTS: A typical BCG scar was verified in 96.9% of the control group and in 90.0% of the preterm infants (P = 0.19. Indurations > 5 mm in diameter were recorded in 87.7% of the full-term and 67.5% of the preterm infants (P = 0.02. Indurations > 10 mm were recorded in 70.8% of the full-term and 42.5% of the preterm infants (P = 0.007. For indurations > 5 mm the upper and the lower limits of the 95% confidence interval for the difference between proportions were 8.5% to 31.8%, and for indurations > 10 mm these limits were 18.0% to 38.4%. No adverse reactions were observed in the study population. CONCLUSION: BCG vaccination could be recommended for preterm infants upon discharge from the neonatal unit to reduce morbidity and mortality in infants at risk for tuberculous infection, and to increase BCG vaccination coverage rates, especially in countries with high prevalence rates of tuberculosis.OBJETIVOS: Se desconoce la eficacia de la vacunación con Bacilo de Calmette-Guérin (BCG en neonatos prematuros, y los datos que existen acerca de la proporción de casos de conversión tuberculínica en este grupo de edad son pocos y cuestionables. En este estudio se evaluó la respuesta a la prueba de tuberculina de neonatos prematuros tras la vacunación con BCG. MÉTODOS: Este estudio de cohorte aleatorizado se llev

  20. Changes in time-use and drug use by young adults in poor neighbourhoods of Greater Buenos Aires, Argentina, after the political transitions of 2001-2002: Results of a survey.

    Science.gov (United States)

    Rossi, Diana; Zunino Singh, Dhan; Pawlowicz, María Pía; Touzé, Graciela; Bolyard, Melissa; Mateu-Gelabert, Pedro; Sandoval, Milagros; Friedman, Samuel R

    2011-01-20

    In some countries, "Big Events" like crises and transitions have been followed by large increases in drug use, drug injection and HIV/AIDS. Argentina experienced an economic crisis and political transition in 2001/2002 that affected how people use their time. This paper studies how time use changes between years 2001 and 2004, subsequent to these events, were associated with drug consumption in poor neighbourhoods of Greater Buenos Aires. In 2003-2004, 68 current injecting drug users (IDUs) and 235 young non-IDUs, aged 21-35, who lived in impoverished drug-impacted neighbourhoods in Greater Buenos Aires, were asked about time use then and in 2001. Data on weekly hours spent working or looking for work, doing housework/childcare, consuming drugs, being with friends, and hanging out in the neighbourhood, were studied in relation to time spent using drugs. Field observations and focus groups were also conducted. After 2001, among both IDUs and non-IDUs, mean weekly time spent working declined significantly (especially among IDUs); time spent looking for work increased, and time spent with friends and hanging out in the neighbourhood decreased.We found no increase in injecting or non-injecting drug consumption after 2001. Subjects most affected by the way the crises led to decreased work time and/or to increased time looking for work--and by the associated increase in time spent in one's neighbourhood--were most likely to increase their time using drugs. Time use methods are useful to study changes in drug use and their relationships to every day life activities. In these previously-drug-impacted neighbourhoods, the Argentinean crisis did not lead to an increase in drug use, which somewhat contradicts our initial expectations. Nevertheless, those for whom the crises led to decreased work time, increased time looking for work, and increased time spent in indoor or outdoor neighbourhood environments, were likely to spend more time using drugs. These data suggest that

  1. Changes in time-use and drug use by young adults in poor neighbourhoods of Greater Buenos Aires, Argentina, after the political transitions of 2001-2002: Results of a survey

    Directory of Open Access Journals (Sweden)

    Mateu-Gelabert Pedro

    2011-01-01

    Full Text Available Abstract Background In some countries, "Big Events" like crises and transitions have been followed by large increases in drug use, drug injection and HIV/AIDS. Argentina experienced an economic crisis and political transition in 2001/2002 that affected how people use their time. This paper studies how time use changes between years 2001 and 2004, subsequent to these events, were associated with drug consumption in poor neighbourhoods of Greater Buenos Aires. Methods In 2003-2004, 68 current injecting drug users (IDUs and 235 young non-IDUs, aged 21-35, who lived in impoverished drug-impacted neighbourhoods in Greater Buenos Aires, were asked about time use then and in 2001. Data on weekly hours spent working or looking for work, doing housework/childcare, consuming drugs, being with friends, and hanging out in the neighbourhood, were studied in relation to time spent using drugs. Field observations and focus groups were also conducted. Results After 2001, among both IDUs and non-IDUs, mean weekly time spent working declined significantly (especially among IDUs; time spent looking for work increased, and time spent with friends and hanging out in the neighbourhood decreased. We found no increase in injecting or non-injecting drug consumption after 2001. Subjects most affected by the way the crises led to decreased work time and/or to increased time looking for work--and by the associated increase in time spent in one's neighbourhood--were most likely to increase their time using drugs. Conclusions Time use methods are useful to study changes in drug use and their relationships to every day life activities. In these previously-drug-impacted neighbourhoods, the Argentinean crisis did not lead to an increase in drug use, which somewhat contradicts our initial expectations. Nevertheless, those for whom the crises led to decreased work time, increased time looking for work, and increased time spent in indoor or outdoor neighbourhood environments, were

  2. Water, ice, and meteorological measurements at South Cascade Glacier, Washington, balance year 2002

    Science.gov (United States)

    Bidlake, William R.; Josberger, Edward G.; Savoca, Mark E.

    2004-01-01

    Winter snow accumulation and summer snow and ice ablation were measured at South Cascade Glacier, Washington, to estimate glacier mass balance quantities for balance year 2002. The 2002 glacier-average maximum winter snow balance was 4.02 meters, the second largest since 1959. The 2002 glacier summer, net, and annual (water year) balances were -3.47, 0.55, and 0.54 meters, respectively. The area of the glacier near the end of the balance year was 1.92 square kilometers, and the equilibrium-line altitude and the accumulation area ratio were 1,820 meters and 0.84, respectively. During September 20, 2001 to September 13, 2002, the terminus retreated 4 meters, and computed average ice speeds in the ablation area ranged from 7.8 to 20.7 meters per year. Runoff from the subbasin containing the glacier and from an adjacent non-glacierized basin were measured during part of the 2002 water year. Air temperature, precipitation, atmospheric water-vapor pressure, wind speed and incoming solar radiation were measured at selected locations near the glacier.

  3. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  4. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  5. Environmental impacts of small dams on agriculture and ground water development: a case study of Khan pur Dam, Pakistan

    International Nuclear Information System (INIS)

    Ejaz, N.; Shahmim, M.A.; Elahi, A.; Khan, N.M.

    2012-01-01

    The water scarcity issues are increasing through out the world. Pakistan is also facing water crises and its water demands are increasing every day. During this research it is investigated that small dams are playing an important role for the sustainability of groundwater and agriculture. The main objective of this study was to assess the environmental impacts of small dam on agricultural and ground water. Proper planning and management of small dams may improve the sustainable agriculture in Pakistan. It is also concluded that small dams are significantly contributing towards economy, environment, local climate, recreational activities and crop production. Small dams can also be utilized for the production of electricity at local level. On the other hand, water management issues can be resolved by the involvement of local farmer's associations. Water losses through seepage, unlined channels and old irrigation methods are most critical in developing world. Considering the overall positive environmental impacts, construction of small dams must be promoted. (author)

  6. Pine Creek Ranch, FY 2001 annual report; ANNUAL

    International Nuclear Information System (INIS)

    Berry, Mark E.

    2001-01-01

    Pine Creek Ranch was purchased in 1999 by the Confederated Tribes of Warm Springs using Bonneville Power Administration Fish and Wildlife Habitat Mitigation funds. The 25,000 acre property will be managed in perpetuity for the benefit of fish and wildlife habitat. Major issues include: (1) Restoring quality spawning and rearing habitat for stealhead. Streams are incised and fish passage barriers exist from culverts and possibly beaver dams. In addition to stealhead habitat, the Tribes are interested in overall riparian recovery in the John Day River system for wildlife habitat, watershed values and other values such as recreation. (2) Future grazing for specific management purposes. Past grazing practices undoubtedly contributed to current unacceptable conditions. The main stem of Pine Creek has already been enrolled in the CREP program administered by the USDA, Natural Resource Conservation Service in part because of the cost-share for vegetation restoration in a buffer portion of old fields and in part because of rental fees that will help the Tribes to pay the property taxes. Grazing is not allowed in the riparian buffer for the term of the contract. (3) Noxious weeds are a major concern. (4) Encroachment by western juniper throughout the watershed is a potential concern for the hydrology of the creek. Mark Berry, Habitat Manager, for the Pine Creek Ranch requested the Team to address the following objectives: (1) Introduce some of the field staff and others to Proper Functioning Condition (PFC) assessments and concepts. (2) Do a PFC assessment on approximately 10 miles of Pine Creek. (3) Offer management recommendations. (4) Provide guidelines for monitoring

  7. Effects of Chiloquin Dam on spawning distribution and larval emigration of Lost River, shortnose, and Klamath largescale suckers in the Williamson and Sprague Rivers, Oregon

    Science.gov (United States)

    Martin, Barbara A.; Hewitt, David A.; Ellsworth, Craig M.

    2013-01-01

    Chiloquin Dam was constructed in 1914 on the Sprague River near the town of Chiloquin, Oregon. The dam was identified as a barrier that potentially inhibited or prevented the upstream spawning migrations and other movements of endangered Lost River (Deltistes luxatusChasmistes brevirostris) suckers, as well as other fish species. In 2002, the Bureau of Reclamation led a working group that examined several alternatives to improve fish passage at Chiloquin Dam. Ultimately it was decided that dam removal was the best alternative and the dam was removed in the summer of 2008. The U.S. Geological Survey conducted a long-term study on the spawning ecology of Lost River, shortnose, and Klamath largescale suckers (Catostomus snyderi) in the Sprague and lower Williamson Rivers from 2004 to 2010. The objective of this study was to evaluate shifts in spawning distribution following the removal of Chiloquin Dam. Radio telemetry was used in conjunction with larval production data and detections of fish tagged with passive integrated transponders (PIT tags) to evaluate whether dam removal resulted in increased utilization of spawning habitat farther upstream in the Sprague River. Increased densities of drifting larvae were observed at a site in the lower Williamson River after the dam was removed, but no substantial changes occurred upstream of the former dam site. Adult spawning migrations primarily were influenced by water temperature and did not change with the removal of the dam. Emigration of larvae consistently occurred about 3-4 weeks after adults migrated into a section of river. Detections of PIT-tagged fish showed increases in the numbers of all three suckers that migrated upstream of the dam site following removal, but the increases for Lost River and shortnose suckers were relatively small compared to the total number of fish that made a spawning migration in a given season. Increases for Klamath largescale suckers were more substantial. Post-dam removal monitoring

  8. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  9. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  10. Evaluatie Dam tot Damloop 2014

    NARCIS (Netherlands)

    Deutekom-Baart de la Faille, Marije

    In het weekend van 20 en 21 september 2014 vond de 30ste editie van de Dam tot Damloop plaats. Onderzoekers van de Hogeschool van Amsterdam en Hogeschool Inholland hebben bij de Dam tot Damloop een evaluatieonderzoek uitgevoerd met als doel het vinden van aanknopingspunten voor het structureel

  11. Chief Joseph Kokanee Enhancement Project : Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grond Coulee Dam Third Powerplant Forebay.

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, M.A.; McKinstry, C.A.; Simmons, C.S.

    2002-01-01

    Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC's Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the first year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory (PNNL). The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. Analysis of the effect of strobe lights on the distribution (numbers) and behavior of kokanee and rainbow trout was based on 51, 683 fish targets detected during the study period (June 30 through August 1, 2001). Study findings include the following: (1) Analysis of the count data indicated that significantly more fish were present when the lights were on compared to off. This was true for both the 24-hr tests as well as the 1-hr tests. Powerplant discharge, distance from lights, and date were significant factors in the analysis. (2) Behavioral results indicated that fish within 14 m of the lights were trying to avoid the lights by swimming across the lighted

  12. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  13. Entomology Unit annual report 2002

    International Nuclear Information System (INIS)

    2002-01-01

    Medfly genetic sexing strains (GSS) are now being used for all operational SIT programmes. In 2002, a new strain, VIENNA 8, was evaluated for stability, quality and production characteristics. The strain carries the inversion as described in the 2001 Annual Report and it can produce ca 10% more males for irradiation and release than could previous GSS. This strain will be transferred to several facilities in 2003. As a further improvement to the strain the visible marker, Sergeant, has been introduced into the strain following the successful field cage evaluations reported in the 2001 Annual Report. In 2003 this strain will be further analysed to assess the stability of the marker. There is considerable interest in the field of medfly SIT in developing procedures whereby eggs can be shipped between different rearing facilities. This could be especially relevant for GSS as a central facility could hold and maintain a specific strain and eggs could be sent to satellite facilities where only males would be reared for sterilization and release. During 2002 a series of egg shipments was received from the medfly mass rearing facility at El Pino, Guatemala and the effect of shipment on the quality parameters of the resultant flies was assessed. It was concluded that although there was some reduction in egg viability, especially for long shipments, it will be possible to develop an effective shipment protocol. In 2002 colonies of Bactrocera oleae and Anastrepha fraterculus were established, the former after some initial problems associated with the unsuitability of the larval diet. In 2003 these colonies will be used to develop improved mass rearing techniques for these species and for A. fraterculus a series of field cage evaluations will be carried out to assess the degree of mating compatibility of populations from the whole geographic range of this species in South and Central America. The development of tsetse mass rearing facilities in Africa is expanding and in

  14. Ingesta de alimentos, energía y nutrientes en la población de 5 a 12 años de la Comunidad de Madrid: resultados de la encuesta de nutrición infantil 2001-2002.

    OpenAIRE

    Lucía Díez-Gañán; Iñaki Galán Labaca; Carmen María León Domínguez; Ana Gandarillas Grande; Belén Zorrilla Torras; Francisca Alcaraz Cebrián

    2007-01-01

    Fundamento: Para conocer la situación alimentaria y nutricional en la población infantil, sobre la que no existía información actualizada, el Instituto de Salud Pública desarrolló la Encuesta de Nutrición Infantil de la Comunidad de Madrid 2001/2002 (ENICM). En este trabajo se analiza la ENICM para describir y evaluar la ingesta de alimentos, energía y nutrientes en esta población. Métodos: Estudio transversal sobre una muestra representativa de la población de 5-12 años ...

  15. Analysis the dynamic response of earth dam in free vibration and forced by introducing the effect of the interaction dam foundation

    Directory of Open Access Journals (Sweden)

    Malika Boumaiza

    2018-01-01

    Full Text Available The present study concerns the analysis of the dynamic response of earth dam, in free and forced vibration (under the effect of earthquake using the finite element method. The analysis is carried out at the end of dam construction without filling. The behavior of the dam materials and the foundation is linear elastic. In free vibration, to better understand the effect of the dam foundation interaction, we will take into account different site conditions and see their influence on the free vibration characteristics of the dam. In forced vibration, to study the seismic response of the dam, the system is subjected to the acceleration of the Boumerdes earthquake of May 21, 2003 recorded at the station n ° 2 of the dam of Kaddara in the base, with a parametric study taking into account the influence of the main parameters such as the mechanical properties of the soil: rigidity, density.

  16. Registratie van soa en HIV consulten bij GGD-en en soa-poliklinieken: Jaarverslag 2002

    NARCIS (Netherlands)

    Laar MJW van de; Veen MG van; Coenen AJJ; CIE

    2003-01-01

    Bij de GGD-en en soa-poliklinieken wordt ten behoeve van de non-curatieve soa-bestrijding een registratie bijgehouden van de bezoekers met een soa-hulpvraag of HIV-testverzoek. In 2002 registreerden 37 GGD-en en twee soa-poliklinieken in totaal 23.353 consulten (stijging van 16% t.o.v. 2001),

  17. Ice interactions at a dam face

    Energy Technology Data Exchange (ETDEWEB)

    Morse, B.; Morse, J.; Beaulieu, P.; Pratt, Y. [Laval Univ., Quebec City, PQ (Canada). Dept. of Civil Engineering; Stander, E. [State Univ. of New York, Cobleskill College, Cobleskill, NY (United States). Dept. of Natural Sciences; Cote, A.; Tarras, A.; Noel, P. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2009-07-01

    This paper reported on a joint research project between Laval University and Hydro-Quebec to study ice forces on dams in an effort to harmonize design criteria and develop mitigation strategies. This paper introduced the project and explored some of the preliminary results of the 2007-2008 field season. Ice displacement, ice stresses and ice forces on the LaGabelle dam were measured at several locations. The paper identified and discussed the complex relationships between data sets and discussed the spatial-temporal variability of the ice forces and its impact on design criteria. The project objective was to develop design criteria for ice forces on dams and to provide a scientific basis for interpreting and harmonizing existing recommended criteria. The methodology and site description were presented. It was concluded that the ice processes in a reservoir near a dam face subject to water fluctuations are quite complex. Therefore, in order to know the real average pressure on the dam, a significant amount of panels are required, having important implications for determining safe design values. 9 refs., 10 figs.

  18. The Political Ecology of Chinese Large Dams in Cambodia: Implications, Challenges and Lessons Learnt from the Kamchay Dam

    Directory of Open Access Journals (Sweden)

    Giuseppina Siciliano

    2016-09-01

    Full Text Available Given the opportunities offered by foreign investment in energy infrastructure mostly by Chinese firms, the Government of Cambodia is giving high priority to developing hydropower resources for reducing energy poverty and powering economic growth. Using a “Political ecology of the Asian drivers” framework, this paper assesses China’s involvement in the development of large dams’ in Cambodia and its impacts on the access of natural resources such as water and energy by dam builders, local communities and the government. This analysis is based on 61 interviews and 10 focus group discussions with affected communities, institutional actors, Chinese dam builders and financiers in relation to the first large Chinese dam built in Cambodia: the Kamchay dam. Based on the results of the analysis this paper makes recommendations on how to improve the planning, implementation and governance of future large dams in Cambodia.

  19. Health-related quality of life surveillance--United States, 1993-2002.

    Science.gov (United States)

    Zahran, Hatice S; Kobau, Rosemarie; Moriarty, David G; Zack, Matthew M; Holt, James; Donehoo, Ralph

    2005-10-28

    Population-based surveillance of health-related quality of life (HRQOL) is needed to promote the health and quality of life of U.S. residents and to monitor progress in achieving the two overall Healthy People 2010 goals: 1) increase the quality and years of healthy life and 2) eliminate health disparities. This report examines surveillance-based HRQOL data from 1993 through 2002. Survey data from a validated set of HRQOL measures (CDC HRQOL-4) were analyzed for 1993-2001 from the Behavioral Risk Factor Surveillance System (BRFSS) surveys for the 50 states and the District of Columbia (DC) and for 2001-2002 from the National Health and Nutrition Examination Survey (NHANES). These measures assessed self-rated health; physically unhealthy days (i.e., the number of days during the preceding 30 days for which physical health, including physical illness and injury, was not good); mentally unhealthy days (i.e., the number of days during the preceding 30 days for which mental health, including stress, depression, and problems with emotions, was not good); and days with activity limitation (i.e., number of days during the preceding 30 days that poor physical or mental health prevented normal daily activities). A summary measure of overall unhealthy days also was computed from the sum of a respondent's physically unhealthy and mentally unhealthy days, with a maximum of 30 days. During 1993-2001, the mean number of physically unhealthy days, mentally unhealthy days, overall unhealthy days, and activity limitation days was higher after 1997 than before 1997. During 1993-1997, the percentage of respondents with zero overall unhealthy days was stable (51%-53%) but declined to 48% by 2001. The percentage of respondents with >/=14 overall unhealthy days increased from 15%-16% during 1993-1997 to 18% by 2001. Adults increasingly rated their health as fair or poor and decreasingly rated it as excellent or very good. Women, American Indians/Alaska Natives, persons of "other races

  20. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  1. Status and progress of the RERTR program in the year 2002

    International Nuclear Information System (INIS)

    Travelli, A.; Technology Development

    2003-01-01

    Following the cancellation of the 2001 International RERTR Meeting, which had been planned to occur in Bali, Indonesia, this paper describes the progress achieved by the Reduced Enrichment for Research and Test Reactors (RERTR) Program in collaboration with its many international partners during the years 2001 and 2002, and discusses the main activities planned for the year 2003. The past two years have been characterized by very important achievements of the RERTR program, but these technical achievements have been overshadowed by the terrible events of September 11, 2001. Those events have caused the U.S. Government to reevaluate the importance and urgency of the RERTR program goals. A recommendation made at the highest levels of the government calls for an immediate acceleration of the program activities, with the goal of converting all the world's research reactors to low-enriched fuel at the earliest possible time, and including both Soviet-designed and United States-designed research reactors

  2. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  3. Expectations of immortality: dam safety management into the next millennium

    International Nuclear Information System (INIS)

    Palmer, M.D.

    1999-01-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs

  4. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities

    International Nuclear Information System (INIS)

    Hawkes, L.A.; Martinson, R.D.; Absolon, R.F.

    1993-05-01

    The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relative run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC's Fish Passage Data System (FPDS)

  5. Langbjorn dam : adaptation for safe discharge of extreme floods

    Energy Technology Data Exchange (ETDEWEB)

    Yang, J. [Vattenfall Research and Development, Alvkarleby (Sweden); Ericsson, H.; Gustafsson, A. [SWECO, Stockholm (Sweden); Stenmark, M. [Vattenfall Power Consultant, Ludvika (Sweden); Mikaelsson, J. [Vattenfall Nordic Generation, Bispgarden (Sweden)

    2007-07-01

    The Langbjorn hydropower scheme, composed of an embankment dam with an impervious core of compacted moraine, a spillway section and a powerhouse, is located on the Angermanalven River in north Sweden. The scheme was commissioned in 1959 and is owned by Vattenfall. As part of its dam safety program, Vattenfall plans to adapt and refurbish many of its dams to the updated design-flood and dam-safety guidelines. Langbjorn is classified as a high hazard dam, as its updated design flood is 30 per cent higher than the existing spillway capacity. Safety evaluations were conducted for the Langbjorn dam, and, as required by the higher safety standard, there was a need to rebuild the dam, so that the design flood could be safely released without causing failure of the dam. This paper provided information on the Langbjorn hydropower scheme and discussed the planned rebuilding measures. For example, the design flood was accommodated by allowing a temporary raise of the water level by 1.3 metres above the legal retention reservoir level, which required heightening and reinforcement of the dam. Specifically, the paper discussed measures to increase the discharge capacity; handling and control of floating debris; improvement and heightening of impervious core in left and right connecting dam and abutment; measures to increase the stability of the left steep riverbank; and measures to increase stability of the spillway monoliths and the left guide wall. In addition, the paper discussed measures to ensure stability of the downstream stretch of the river bank and increase instrumentation. The paper also presented the results of hydraulic investigations to investigate the risk of erosion downstream of the dam. It was concluded that the dam could discharge the design flood and that the stability of the dam was improved and judged to be satisfactory during all foreseeable conditions. 2 refs., 8 figs.

  6. The mathematics of dam safety

    Energy Technology Data Exchange (ETDEWEB)

    Widmann, R. [Osterreichische Gesellschaft fuer Geomechanik, Salzburg (Austria)

    1997-05-01

    The safety of a dam is determined by its design, construction and supervision during operation. High arch dam failures have dropped dramatically since the early part of this century. An essential part of the success story relates to improved measurement techniques that can detect earlier unexpected behaviour that may lead to failure. (UK)

  7. Automatic dam concrete placing system; Dam concrete dasetsu sagyo no jidoka system

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, Y; Hori, Y; Nakayama, T; Yoshihara, K; Hironaka, T [Okumura Corp., Osaka (Japan)

    1994-11-15

    An automatic concrete placing system was developed for concrete dam construction. This system consists of the following five subsystems: a wireless data transmission system, an automatic dam concrete mixing system, a consistency determination system, an automatic dam concrete loading and transporting system, and a remote concrete bucket opening and closing system. The system includes the following features: mixing amount by mixing ratio and mixing intervals can be instructed from a concrete placing site by using a wireless handy terminal; concrete is mixed automatically in a batcher plant; a transfer car is started, and concrete is charged into a bucket automatically; the mixed concrete is determined of its properties automatically; labor cost can be reduced, the work efficiency improved, and the safety enhanced; and the system introduction has resulted in unattended operation from the aggregate draw-out to a bunker line, manpower saving of five persons, and reduction in cycle time by 10%. 11 figs., 2 tabs.

  8. Comparison of electron density profiles observed in China's low latitude station with that produced by the International Reference Ionosphere (IRI2001)

    International Nuclear Information System (INIS)

    Zhang Manlian; Shi Jiankui; Wang Xiao

    2003-01-01

    One month's data of ionograms observed by DPS-4 digisonde in China's low latitude station Hainan (19.4 deg N/109.0 deg E) for the high solar activity year 2002 is used to make a comparison study between the observational electron density profiles and that produced by the newly updated International Reference Ionosphere (IRI2001). The present study showed that for the month studied (April, 2002): (1) When B0-Tab value is used, profiles given by IRI2001 are in poor agreement with the observational results during daytime and nearby midnight hours when standard Ne(h) option is chosen, whereas when the LAY functions version is chosen, IRI2001 produces profiles with erroneous features during evening and nighttime hours, although it produces profiles in a reasonable good agreement with the observational ones during daytime hours. (2) In general, profiles produced by IRI2001 with B0-Gulyaeva choice is in better agreement with observational profiles than when B0-Tab is chosen. When the B0-Gulyaeva and LAY functions version of Ne(h) are both chosen, IRI2001 produced the best results when compared with the observational results. (3) The B0 parameter given by B0-Gulyaeva choice in IRI2001 is much closer to the observed (best fitted) one than that given by the B0-Tab choice is. (author)

  9. Dam safety investigations of the concrete structures of Hugh Keenleyside dam

    International Nuclear Information System (INIS)

    Hanna, A.W.; Nunn, J.O.H.; Cornish, L.; Northcott, P.

    1993-01-01

    The Hugh Keenleyside dam is located on the Columbia River in southeastern British Columbia, and impounds Arrow Lakes Reservoir which has a live storage of 8.8 km 3 and drains an area of 36,000 km 2 . It consists of a number of concrete structures, with a total length of 360 m and a maximum height of 58 m, and an earthfill embankment which spans across the original river channel. The 450 m long zoned earthfill dam is founded on pervious alluvium over 150 m deep. It has a sloping impervious core constructed from glacial till which extends 670 m upstream of the dam. This impervious blanket extends over the full width of the reservoir and is connected to the upstream face of the concrete structures. The results of a dam safety study, which was carried out due to the presence of high uplift pressures at some parts of the foundation, and stability concerns, are presented. The investigation concluded that the high uplift pressures were due to a localized defect in the upstream blanket and did not indicate any general deterioration of the blanket. Techniques that were found to be of particular use in the study for defining the source and nature of the foundation defects were: temperature surveys of flows from piezometers, cells and drains; air injection tests; and pressure response testing of cells, piezometers and drains to establish foundation interconnections. The concrete structures met the stability criteria for all load cases considered except for the navigation lock and the low level outlets. 3 refs., 6 figs

  10. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  11. On the response of large dams to incoherent seismic excitation

    International Nuclear Information System (INIS)

    Ramadan, O.; Novak, M.

    1993-01-01

    An intensive parametric study was conducted to investigate the response of concrete gravity dams to horizontal, spatially variable seismic ground motions. Both segmented dams consisting of separate blocks, or monoliths, and continuous monolithic dams are considered. The study includes the effects of various parameters on system natural frequencies, vibration modes, modal displacement ratios, as well as dam displacements and internal stresses due to spatially variable ground motions. The dam analytical model, and dam response to incoherent ground motions are described. The results show that the dam vibrates almost as a rigid body under the fully correlated waves, but bends and twists significantly under the spatially correlated motions. Dam-foundation interaction magnifies the low frequency components of the dam response, more so for a full reservoir, but decreases the high frequency components. For long dams, the effects of spatially incoherent ground motions are qualitatively different and can be much greater than those due to surface travelling waves. 3 refs., 3 figs

  12. the effect of age of dam on weaning mass for ftve dam breed types

    African Journals Online (AJOL)

    SUMMARY: The effect of age of dam on adjusted 210 day calf weaning mass was estimated by the Least Squares method for 5 dam types on 2 farms. ... the later maturing breeds would have a low level of productivity because these cows would be eliminated in their potentially prime .... time at 28 (2A) or 3l (28) months old.

  13. Proceeding of the public safety around dams conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Canadian Dam Association hosted the Public Safety Around Dams workshop in which presentations were given in the morning to describe the different measures and methods implemented by the Ontario Ministry of Natural Resources, Ontario Power Generation and others to improve safety around dams. In the afternoon, the participants toured the Auburn and Lakefield dams and facilities to view the infrastructures and equipment. A roundtable discussion concluded the day. Following this workshop, a Public Safety Around Dams group was created on the social network site, LinkedIn. This conference featured 6 presentations, 3 of which have been catalogued separately for inclusion in this database.

  14. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  15. Space and habitat use by black bears in the Elwha valley prior to dam removal

    Science.gov (United States)

    Sager-Fradkin, K.A.; Jenkins, K.J.; Happe, P.J.; Beecham, J.J.; Wright, R.G.; Hoffman, R.A.

    2008-01-01

    Dam removal and subsequent restoration of salmon to the Elwha River is expected to cause a shift in nutrient dynamics within the watershed. To document how this influx of nutrients and energy may affect black bear (Ursus americanus) ecology, we used radio-telemetry to record movements of 11 male and two female black bears in the Elwha Valley from 2002-06. Our objective was to collect baseline data on bear movements prior to dam removal. We calculated annual home ranges, described seasonal timing of den entry and emergence, and described seasonal patterns of distribution and habitat use. Adaptive kernel home ranges were larger formales (mean = 151.1 km2, SE = 21.4) than females (mean = 38.8 km2, SE = 13.0). Males ranged widely and frequently left the watershed during late summer. Further, they exhibited predictable and synchronous patterns of elevation change throughout each year. Bears entered their winter dens between 8 October and 15 December and emerged from dens between 10 March and 9 May. Male bears used low-elevation conifer and hardwood forests along the Elwha floodplain during spring, mid- to high-elevation forests and meadows during early summer, high-elevation forests, meadows and shrubs during late summer, and mid-elevation forests, shrubs and meadows during fall. Data acquired during this study provide important baseline information for comparison after dam removal, when bears may alter their late summer and fall movement and denning patterns to take advantage of energy-rich spawning salmon.

  16. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    Science.gov (United States)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6

  17. Ziff Energy Group's 3. annual 2001+ gas industry outlook

    International Nuclear Information System (INIS)

    2001-04-01

    A survey was conducted in April 2001 regarding industry expectations of gas prices, supply, markets, and transportation. The survey involved 97 participants ranging from gas producers, end-users, marketers, pipeline and local distribution companies in North America. The results of the survey can be summarized as follows: Natural gas prices are expected to grow and remain above oil prices through at least 2002. There will continue to be strong growth prospects for North American gas supply, but North American gas storage will be tight for the winter of 2001. North American gas demand is expected to continue to grow. Participants in the survey remained confident that gas demand would continue to grow, despite higher gas prices. Competition from alternative fuels in electricity generation did not appear to be an area of concern for the participants of the survey. 30 figs

  18. Facts 2002. The Norwegian petroleum sector

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The petroleum sector is highly significant for the Norwegian economy. Its share of gross domestic product, exports and total government revenues has been substantial over the past two decades, reaching a particularly high level in 2000 and 2001. The principal reason why revenues were so high in these two years is a combination of high oil prices, a strong USD against the NOK and historically high petroleum production. The share of petroleum investment in total capital spending in the Norwegian economy was at its highest in the early 1990s. Total investment in the petroleum sector has been above NOK 40 bn every year since 1992, and peaked in 1998 at roughly NOK 80 bn. Capital spending declined to around NOK 56.9 bn in 2001. The government's most important revenue sources in recent years have been cash flow from the state's direct financial interest (SDFI) and from taxes. Production of crude oil has averaged around three mill barrels per day since 1996. The figure for 2001 was 3.1 mill barrels. Including natural gas liquids (NGL) and condensate raises the 2001 average to 3.4 mill barrels oe per day. At 53 mill scm oe, gas production was also high in 2001. Oil production is expected to remain more or less unchanged over the next few years, and then to go into a gradual decline. Gas output, on the other hand, should expand substantially over the coming decade and is expected to be increasingly significant in Norwegian petroleum output in future. The petroleum sector is also a substantial player internationally. Norway ranks as the world's sixth largest producer and third largest net exporter of oil. It is also the world's third largest exporter of pipeline gas, and Norwegian foreign sales of this commodity accounted for about two per cent of global consumption in 2001. Roughly 10 per cent of west European gas consumption is covered from Norway. Several changes were made to state participation in the petroleum sector during 2001. The government sold 15 per cent of the

  19. Facts 2002. The Norwegian petroleum sector

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The petroleum sector is highly significant for the Norwegian economy. Its share of gross domestic product, exports and total government revenues has been substantial over the past two decades, reaching a particularly high level in 2000 and 2001. The principal reason why revenues were so high in these two years is a combination of high oil prices, a strong USD against the NOK and historically high petroleum production. The share of petroleum investment in total capital spending in the Norwegian economy was at its highest in the early 1990s. Total investment in the petroleum sector has been above NOK 40 bn every year since 1992, and peaked in 1998 at roughly NOK 80 bn. Capital spending declined to around NOK 56.9 bn in 2001. The government's most important revenue sources in recent years have been cash flow from the state's direct financial interest (SDFI) and from taxes. Production of crude oil has averaged around three mill barrels per day since 1996. The figure for 2001 was 3.1 mill barrels. Including natural gas liquids (NGL) and condensate raises the 2001 average to 3.4 mill barrels oe per day. At 53 mill scm oe, gas production was also high in 2001. Oil production is expected to remain more or less unchanged over the next few years, and then to go into a gradual decline. Gas output, on the other hand, should expand substantially over the coming decade and is expected to be increasingly significant in Norwegian petroleum output in future. The petroleum sector is also a substantial player internationally. Norway ranks as the world's sixth largest producer and third largest net exporter of oil. It is also the world's third largest exporter of pipeline gas, and Norwegian foreign sales of this commodity accounted for about two per cent of global consumption in 2001. Roughly 10 per cent of west European gas consumption is covered from Norway. Several changes were made to state participation in the petroleum sector during 2001. The government sold

  20. Facts 2002. The Norwegian petroleum sector

    International Nuclear Information System (INIS)

    2002-01-01

    The petroleum sector is highly significant for the Norwegian economy. Its share of gross (domestic product, exports and total government revenues has been substantial over the past two decades, reaching a particularly high level in 2000 and 2001. The principal reason why revenues were so high in these two years is a combination of high oil prices, a strong USD against the NOK and historically high petroleum production. The share of petroleum investment in total capital spending in the Norwegian economy was at its highest in the early 1990s. Total investment in the petroleum sector has been above NOK 40 bn every year since 1992, and peaked in 1998 at roughly NOK 80 bn. Capital spending declined to around NOK 56.9 bn in 2001. The government's most important revenue sources in recent years have been cash flow from the state's direct financial interest (SDFI) and from taxes. Production of crude oil has averaged around three mill barrels per day since 1996. The figure for 2001 was 3.1 mill barrels. Including natural gas liquids (NGL) and condensate raises the 2001 average to 3.4 mill barrels oe per day. At 53 mill scm oe, gas production was also high in 2001. Oil production is expected to remain more or less unchanged over the next few years, and then to go into a gradual decline. Gas output, on the other hand, should expand substantially over the coming decade and is expected to be increasingly significant in Norwegian petroleum output in future. The petroleum sector is also a substantial player internationally. Norway ranks as the world's sixth largest producer and third largest net exporter of oil. It is also the world's third largest exporter of pipeline gas, and Norwegian foreign sales of this commodity accounted for about two per cent of global consumption in 2001. Roughly 10 per cent of west European gas consumption is covered from Norway. Several changes were made to state participation in the petroleum sector during 2001. The government sold 15 per cent of the