WorldWideScience

Sample records for based maintenance ganhos

  1. Earnings with Condition Based Maintenance; Ganhos com manutencao preditiva baseada em dados de processo em tempo real

    Energy Technology Data Exchange (ETDEWEB)

    Barabas, Elizabeth [Softbrasil Automacao, Sao Paulo, SP (Brazil)

    2008-07-01

    Keeping active in perfect functioning is essential for any company. Today, the maintenance has been performed in most of the stops for maintenance. In a modern industrial environment, where the systems provide data and process information in real time, it is possible bring the performance of the plant to a optimized level, through the maintenance based on condition of equipment. This work described the earnings with CBM (Condition Based Maintenance)

  2. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  3. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  4. Otimização da largura de banda de ganho de um amplificador Raman na banda "O" baseada em algoritmo genético

    OpenAIRE

    David Steinberg

    2011-01-01

    Neste trabalho a otimização da largura de banda de ganho de um amplificador Raman discreto na banda "O" utilizando algoritmo genético de um simulador comercial foi realizada. O objetivo principal do trabalho foi otimizar a maior largura de banda de ganho do amplificador Raman obtendo valores de variação de ganho menores que 0.5 dB. Utilizando uma fibra DCF (Dispersion Compensating Fiber) como meio de ganho do amplificador Raman, o número de bombeio foi variado e a variação de ganho para ca...

  5. Projeto de EDFAs com controle automatico de ganho totalmente optico para aplicações em redes WDM

    OpenAIRE

    Julio Cesar Rodrigues Fernandes de Oliveira

    2004-01-01

    Resumo: A variação na potência da entrada em amplificadores ópticos a fibra dopada com Érbio (EDFAs) induz alterações em seu ganho. No caso de sistemas ou redes WDM onde o número de canais acoplados ao amplificador varia, o ganho torna-se dependente do número de canais que estão sendo transmitidos, especialmente se o amplificador opera saturado. Este trabalho apresenta o desenvolvimento e a avaliação experimental de uma técnica de controle de ganho totalmente óptica para EDFAs. Esta técnica d...

  6. Prevalência e fatores associados ao ganho de peso gestacional excessivo em unidades de saúde do sudoeste da Bahia

    Directory of Open Access Journals (Sweden)

    Elma Izze da Silva Magalhães

    2015-12-01

    Full Text Available RESUMO: Objetivo: Determinar a prevalência do ganho de peso semanal excessivo em gestantes e verificar a associação com fatores demográficos, socioeconômicos, obstétricos, antropométricos e comportamentais. Metodologia: Trata-se de um estudo transversal realizado com 328 gestantes assistidas em todas as unidades de saúde da zona urbana de Vitória da Conquista, Bahia. Os dados foram coletados no período de maio de 2010 a junho de 2011. O ganho de peso semanal foi avaliado de acordo com as recomendações atuais do Institute of Medicine (IOM. A associação entre os fatores em estudo e o ganho de peso semanal excessivo foi verificada nas gestantes, no segundo e terceiro trimestres, por meio da análise de regressão de Poisson com variância robusta. Resultados: A prevalência de ganho de peso semanal excessivo nas gestantes do segundo e terceiro trimestres foi de 42,5%. Os fatores determinantes do ganho ponderal semanal excessivo foram: renda familiar < 1 salário mínimo (RP: 2,65; IC95% 1,18 - 4,83 e estado nutricional pré-gestacional sobrepeso/obesidade (RP: 1,33; IC95% 1,01 - 1,75. Conclusão: Os resultados do estudo reforçam a importância do monitoramento do ganho de peso durante a gestação. A avaliação do ganho de peso semanal possibilita a realização de intervenções precoces visando a prevenção do ganho de peso total excessivo e suas consequências para a mãe e para a criança.

  7. Ganho de seleção no melhoramento genético intrapopulacional do maracujazeiro-amarelo

    Directory of Open Access Journals (Sweden)

    Willian Krause

    2012-01-01

    Full Text Available O objetivo deste trabalho foi estimar o ganho de seleção associado a características agronômicas de importância no melhoramento intrapopulacional do maracujazeiro-amarelo. O experimento foi realizado em campo, no Município de Terra Nova do Norte, MT, com a avaliação de 111 famílias de irmãos completos (FIC e seis cultivares comerciais, utilizadas como testemunhas. Utilizou-se o delineamento de blocos ao acaso, com três repetições e quatro plantas por parcela. Foram avaliadas as seguintes características: produtividade, comprimento, diâmetro e peso médio dos frutos, percentagem e peso de polpa, espessura de casca e teor de sólidos solúveis. Para verificar a existência de variabilidade genética entre os genótipos, estimaram-se os parâmetros genéticos da população com base na média das famílias. Os 30 genótipos com o menor valor da soma de postos, de acordo com o índice de seleção de Mulamba & Mock, foram selecionados para estimar os ganhos genéticos. Observaram-se altos valores médios para as características e parâmetros genéticos avaliados nas 26 FIC e nas quatro testemunhas selecionadas. O uso do índice de seleção proporciona ganhos genéticos positivos em produtividade, percentagem e peso de polpa, comprimento, diâmetro e peso de frutos, e espessura de casca.

  8. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  9. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  10. POSSIBILIDADE DE GANHO DE FUSTE EM ESPÉCIES EUXILÓFORAS NATIVAS DA REGIÃO CENTRAL DO RIO GRANDE DO SUL

    Directory of Open Access Journals (Sweden)

    Alessandro Dal’Col Lúcio

    2003-09-01

    Full Text Available O presente trabalho foi desenvolvido com o intuito de observar e quantificar a possibilidade de ganho de fuste em cinco espécies euxilóforas (Angico (Parapiptadenia rigida, Canjerana (Cabralea canjerana, Cedro (Cedrela fissilis, Grápia (Apuleia leiocarpa, e Louro (Cordia trichotoma em matas nativas, não-manejadas, de São João do Polêsine, RS. Foram levantadas 17 parcelas temporárias de 10 x 100 m nas matas nativas do município. Nas árvores das cinco espécies eleitas para este estudo, que apresentavam diâmetro à altura do peito (dap superior a 5 cm, foram medidas a altura total, a altura comercial atual e a altura comercial potencial dos troncos. O ganho de fuste foi definido como a diferença entre a altura comercial atual e potencial, em relação à altura comercial atual e expresso em porcentagem. O percentual médio de ganho de fuste para todas as espécies em conjunto foi superior a 70%. O Louro mostrou um ganho de fuste significativamente menor que as demais espécies. Mediante a análise de regressão (stepwise, selecionou-se modelos matemáticos que melhor descrevem o ganho de fuste de cada espécie e das espécies em conjunto. Os resultados mostraram que existe um potencial para o aumento do valor das formações florestais nativas da região, ainda não-explorado por ações silviculturais.

  11. A variable-gain transimpedance amplifier for MEMS-based oscillators = : Um amplificador de transimpedância de ganho variável para aplicação em osciladores baseados em MEMS

    OpenAIRE

    Pedro Emiliano Paro Filho

    2012-01-01

    Resumo: Um amplificador de transimpedância (TIA) de ganho variável é apresentado. Implementado em tecnologia 0,18 'mi'm, o projeto relatado possui a finalidade de prover um amplificador de sustentação para osciladores baseados em ressonadores do tipo MEMS (Micro-Electro-Mechanical System). Entre outros, as peculiaridades de projeto envolvem um desafiante compromisso entre Ganho, Largura de Banda, Ruído e Consumo de potência. Sendo assim, o amplificador foi implementado através do cascateament...

  12. Exigências Líquidas de Aminoácidos para Ganho de Peso de Nelores Não-Castrados Net Amino Acids Requirements for Weight Gain of Nellore Bulls

    Directory of Open Access Journals (Sweden)

    Fabiano Ferreira da Silva

    2002-01-01

    Full Text Available Foram utilizados 40 novilhos Nelore inteiros, com peso vivo médio inicial de 240 kg, sendo quatro novilhos de referência, quatro alimentados para mantença e o restante distribuído em oito tratamentos, com quatro diferentes níveis de concentrado nas dietas (20; 40; 60 e 80% e dois níveis de proteína bruta (PB (15 e 18%. A fase de recria foi avaliada até 360 kg de peso vivo e a fase de engorda, até 450 kg de peso vivo. O volumoso utilizado foi feno de capim Tyfton (Cynodon dactylon. Após o abate, todas as partes do corpo do animal foram pesadas e amostradas. As amostras foram liofilizadas para determinação de matéria seca, pré-desengorduradas com éter e, posteriormente, moídas e determinados os teores de aminoácidos. As exigências líquidas de aminoácidos para ganho de peso foram calculadas segundo o método fatorial, no qual o ganho de proteína foi multiplicado pela composição aminoacídica do corpo vazio. A exigência líquida de aminoácidos para mantença foi estimada. A soma das exigências metabolizável para mantença e ganho compôs a exigência total de aminoácidos metabolizáveis. As exigências líquidas para ganho de aminoácidos diminuíram com o aumento do peso vivo do animal. A exigência total de aminoácidos metabolizáveis, expressos em % do total de aminoácidos essenciais, não variou muito com o aumento do peso vivo, obtendo-se valores médios de 2,66; 15,11; 6,09; 8,64; 9,26; 18,48; 8,33; 12,01; e 19,41 para metionina, lisina, histidina, fenilalanina, treonina, leucina, isoleucina, valina e arginina, respectivamente.Forty Nellore bulls, with 240 kg initial live weight (LW, were used. Four were reference bulls, four were fed for maintenance, and the remaining were allotted to eight treatments, with four different concentrate levels in the diets (20, 40, 60 and 80% and two levels of crude protein (CP (15 and 18%. The growing phase was evaluated up to 360 kg of LW and the fattening phase, up to 450 kg of

  13. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  14. Advantages of condition-based maintenance approach

    International Nuclear Information System (INIS)

    Bareiss, J.; Roos, E.; Jovanovic, A.; Perunicic, M.; Balos, D.

    2004-01-01

    Pilot applications in EnBW steam boiler components and high-pressure pipe systems in the context of the European research project RIMAP (''Risk Based Inspection and Maintenance Procedures for European Industry'') showed that application of a risk-based maintenance strategy (e.g. RIMAP) will make the decision process more transparent and enable better condition-oriented maintenance. With regard to life management of the systems (availability, product quality), this appears to be more important than than the aspect of cost reduction in the maintenance sector, although the latter may not be unwelcome. (orig.) [de

  15. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  16. Collaborative learning in condition based maintenance

    NARCIS (Netherlands)

    Koochaki, J.; Ao, SI; Gelman, L; Hukins, DWL; Hunter, A; Korsunsky, AM

    2009-01-01

    In recent years, the importance of reliable and consistent production equipments has increased. As a result, companies are shifting their maintenance policy from preventive maintenance towards Condition Based Maintenance (CBM). Despite the growing trend in this area and success stories of CBM

  17. Avaliação do crescimento de tecidos e órgãos de novilhos mestiços Holandês-Gir durante o ganho compensatório. 1. Carcaça

    Directory of Open Access Journals (Sweden)

    Almeida Maria Izabel Vieira de

    2001-01-01

    Full Text Available O objetivo deste trabalho foi analisar os efeitos da restrição alimentar anterior ao confinamento sobre o crescimento e a composição química da carcaça e seus componentes em bovinos. Foram utilizados vinte e quatro novilhos mestiços Holandês-Gir com idade de 19,3 ± 5,1 meses e peso vivo de 202,1 ± 49,1 kg, ao início do experimento. Quinze animais foram confinados após um período de restrição de pasto (grupo ganho compensatório, enquanto nove deles tiveram livre acesso ao pasto (grupo ganho contínuo. Foram abatidos três animais de cada grupo, no início, aos 28 e aos 112 dias do confinamento e, aos 56 e 84 dias de confinamento, foram abatidos três animais do grupo de ganho compensatório. Durante o confinamento, os animais do grupo de ganho compensatório e do grupo de ganho contínuo receberam alimentação ad libitum, composta por silagem de milho e 26% de concentrado, na matéria seca. As taxas de crescimento relativo foram avaliadas por meio de equações alométricas. As taxas de deposição de proteína, gordura e energia na carcaça, em relação ao ganho de peso de corpo vazio, não diferiram entre os tratamentos. A deposição de proteína na carcaça, em relação ao ganho de peso vivo, foi maior nos animais em ganho compensatório que nos de ganho contínuo. O ganho de peso compensatório causou redução na deposição de proteína no tecido adiposo e aumento na deposição de gordura nos ossos da carcaça.

  18. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    OpenAIRE

    G. Waeyenbergh; L. Pintelon; L. Gelders

    2012-01-01

    Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised mainten...

  19. Conteúdo corporal e exigências líquidas de energia e proteína de novilhos mestiços Holandês-Gir em ganho compensatório

    Directory of Open Access Journals (Sweden)

    Almeida Maria Izabel Vieira de

    2001-01-01

    Full Text Available Foram utilizados 39 novilhos mestiços Holandês-Gir, com o objetivo de avaliar o efeito da restrição alimentar anterior ao confinamento sobre as mudanças na composição corporal e nas exigências líquidas de energia para mantença e ganho de peso e de proteína para ganho de peso. Trinta animais foram submetidos à alta pressão de pastejo, enquanto os nove restantes tiveram oferta ilimitada de pasto (grupo ganho contínuo; após este procedimento, seis animais do primeiro grupo e três do segundo grupo foram abatidos e os restantes foram confinados. Dos 24 animais do grupo ganho compensatório, 12 receberam alimentação ad libitum (grupo ganho compensatório e 12, alimento 15% acima da mantença (grupo mantença, enquanto os seis animais do grupo ganho contínuo receberam a mesma dieta ad libitum. A dieta foi constituída por silagem de milho e 26% de concentrado. A exigência de energia líquida para mantença foi determinada por regressão da produção de calor, em função do consumo de energia metabolizável (EM, extrapolando-se para nível zero de ingestão de EM. Foram ajustadas equações de regressão do logaritmo das quantidades corporais de gordura, proteína e energia, em função do logaritmo do peso corporal vazio (PCVZ. A exigência média de energia líquida para mantença para os animais em ganho compensatório foi de 47,50 kcal/kg0,75/dia. A quantidade de gordura e o conteúdo de energia no peso ganho aumentaram, à medida que o peso vivo dos animais aumentou. Os requerimentos líquidos de energia e proteína para ganho de 1 kg de PCVZ foram de 3,13 Mcal/dia e 189,4 g/dia, respectivamente, para animais com 300 kg de peso vivo.

  20. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  1. Information-Based Maintenance Optimization with Focus on Predictive Maintenance (Informatiegebaseerde onderhoudsoptimalisatie met focus op predictief onderhoud)

    OpenAIRE

    Van Horenbeek, Adriaan

    2013-01-01

    This dissertation presents an information-based maintenance optimization methodology for physical assets; with focus on, but not limited to, predictive maintenance (PdM). The overall concept of information-based maintenance is that of updating maintenance decisions based on evolving knowledge of operation history and anticipated usage of the machinery, as well as the physics and dynamics of material degradation in critical machinery components. Within this concept, predictive maintenance is a...

  2. Maintenance Staffing Standards for Zero-Based Budgeting.

    Science.gov (United States)

    Adams, Matthew C.; And Others

    1998-01-01

    Discusses school preventive maintenance and the variables associated with maintenance staffing standards that address a zero-based budgeting environment. Explores preventive-maintenance measurement for staffing requirements, defines staffing levels and job descriptions, and outlines the factors to consider when creating a maintenance program and…

  3. Exigências de energia para mantença e eficiência de utilização da energia metabolizável para mantença e ganho de peso de caprinos Moxotó Energy requirements for maintenance and net efficiency of metabolizable energy utilization for maintenance and weight gain of Moxotó kids

    Directory of Open Access Journals (Sweden)

    Kaliandra Souza Alves

    2008-08-01

    Full Text Available Objetivou-se avaliar as exigências líquidas de energia para mantença e as eficiências de utilização da energia metabolizável (EUEM para mantença (km e ganho de peso (kf. Utilizaram-se 26 animais da raça Moxotó, machos não-castrados com peso vivo (PV médio inicial de 15 kg e 7 a 8 meses de idade, alimentados com dieta contendo 2,6 Mcal de energia metabolizável. No início do experimento, seis animais foram abatidos e serviram como referência para estimativa da composição corporal e do peso de corpo vazio (PCVZ iniciais. Posteriormente, os animais foram distribuídos inteiramente ao acaso em grupos homogêneos de quatro animais, um para cada nível de consumo: alimentação à vontade (AV e alimentação restrita (85, 70 e 55% do consumido pelo grupo que recebeu alimentação à vontade. No momento em que o PV dos animais que recebiam alimentação à vontade se aproximava de 25 kg, o grupo era abatido. As exigências líquidas de energia para mantença foram estimadas pelas relações logarítmica ou exponencial da produção de calor (PC e o consumo de energia metabolizável (CEM. As km e kf foram calculadas como a relação entre a energia líquida da dieta para ganho ou mantença e a concentração de energia metabolizável das dietas. Posteriormente, estimaram-se as exigências de EM e NDT. A exigência de energia líquida para mantença, de 55,11 kcal/kgPCVZ0,75, foi próxima ao predito pelas normas norte-americanas para essa espécie. Esse valor é considerado baixo se comparado aos reportados na literatura brasileira pesquisada. A km estimada foi de 0,57 e as kf para as concentrações de 2,99; 2,95; 2,56 e 2,5 Mcal/kg de MS foram de 0,22; 0,19; 0,28 e 0,36, respectivamente.Twenty-six Moxotó non-castrated male kids (averaging 15 kg of initial live weight (LW and 6-8 months old fed a diet with 2.6 Mcal of metabolizable energy were used to predict the net energy requirements for maintenance and net efficiency of

  4. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  5. Component-Based Data-Driven Predictive Maintenance to Reduce Unscheduled Maintenance Events

    NARCIS (Netherlands)

    Verhagen, W.J.C.; Curran, R.; de Boer, L.W.M.; Chen, C.H.; Trappey, A.C.; Peruzzini, M.; Stjepandić, J.; Wognum, N.

    2017-01-01

    Costs associated with unscheduled and preventive maintenance can contribute significantly to an airline's expenditure. Reliability analysis can help to identify and plan for maintenance events. Reliability analysis in industry is often limited to statistically based

  6. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  7. Cost savings from performance-based maintenance contracting

    NARCIS (Netherlands)

    Straub, A.

    2009-01-01

    New procurement approaches combined with performance-based building approaches should reduce costs, but empirical qualitative and quantitative studies are lacking. Performance-based maintenance contracts give maintenance suppliers incentives to improve their way of working. Innovative,

  8. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    Directory of Open Access Journals (Sweden)

    G. Waeyenbergh

    2012-01-01

    Full Text Available Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised maintenance concept. After describing the general framework and its decision support use, some case experiences are given. This experience covers some elements of the proposed framework.

  9. Discounted cost model for condition-based maintenance optimization

    International Nuclear Information System (INIS)

    Weide, J.A.M. van der; Pandey, M.D.; Noortwijk, J.M. van

    2010-01-01

    This paper presents methods to evaluate the reliability and optimize the maintenance of engineering systems that are damaged by shocks or transients arriving randomly in time and overall degradation is modeled as a cumulative stochastic point process. The paper presents a conceptually clear and comprehensive derivation of formulas for computing the discounted cost associated with a maintenance policy combining both condition-based and age-based criteria for preventive maintenance. The proposed discounted cost model provides a more realistic basis for optimizing the maintenance policies than those based on the asymptotic, non-discounted cost rate criterion.

  10. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  11. Ageing Management Based Maintenance at ETRR-II

    Energy Technology Data Exchange (ETDEWEB)

    Kamoon, A.; Ali, A., E-mail: akamoun2004@yahoo.com [Inshas Nuclear Research Centre, Egyptian Atomic Energy Authority (EAEA), Cairo (Egypt)

    2014-08-15

    The second research reactor of Egypt, ETRR-II, is an open pool type multi-purpose reactor of 22 MW that has been in operation since 1998. The main purposes of ETRR-II are the production of radioisotopes, personnel training, research and development. Ageing management of ETRR-II is based on the maintenance programme. This programme was planned to have a proactive maintenance strategy that mainly depends on adequate preventive and predictive maintenance. Screening of SSCs is based on safety classes, needs and quality levels. The operation condition and maintenance history are the basis to assess the level of degradation. The ultimate aim of the maintenance team is to perform adequate maintenance work only when it is really necessary. The objectives of the ageing management based maintenance are to maintain and improve equipment availability, confirm compliance with operational limits and conditions, and detect and correct any abnormal condition that might affect reactor safety. The programme also helps to detect trends in ageing so that a plan for mitigating ageing effects can be prepared and implemented. Reactor service conditions are monitored through many parameters and conditions such as conductivity and pH of coolant water, water radiochemical analysis, thermal and hydraulic parameters, a leak detection system, corrosion rate of piping, vibration level of rotating equipment and control rod drop time.

  12. An Intelligent Fleet Condition-Based Maintenance Decision Making Method Based on Multi-Agent

    OpenAIRE

    Bo Sun; Qiang Feng; Songjie Li

    2012-01-01

    According to the demand for condition-based maintenance online decision making among a mission oriented fleet, an intelligent maintenance decision making method based on Multi-agent and heuristic rules is proposed. The process of condition-based maintenance within an aircraft fleet (each containing one or more Line Replaceable Modules) based on multiple maintenance thresholds is analyzed. Then the process is abstracted into a Multi-Agent Model, a 2-layer model structure containing host negoti...

  13. Avaliação do consumo e ganho de peso de novilhos em pastejo rotacionado de capim-elefante (Pennisetum purpureum, Schum. cv. Napier, na estação chuvosa Evaluation of intake and weight gain of steers in rotacional grazing of elephantgrass (Pennisetum purpureum, Schum. cv. Napier, during the rainy season

    Directory of Open Access Journals (Sweden)

    Eleonora D'Avila Erbesdobler

    2002-09-01

    Full Text Available A pesquisa foi conduzida na Fazenda Experimental da EPAMIG-Leopoldina, MG, onde foram avaliados o consumo de capim-elefante, a efetividade da limitação do tempo de pastejo a quatro horas diárias, para manter o consumo próximo à mantença e o ganho de peso de 36 novilhos ¾ Gir-Holandês, em cinco períodos sucessivos de 36 dias, na estação chuvosa. Os tratamentos foram: livre acesso ao pasto (pastejo irrestrito e pastejo restrito. A disponibilidade de matéria verde seca do capim-elefante nos cinco períodos variou de 4,0 a 7,8 kg/100 kg PV. Os animais com livre acesso ao pasto consumiram o equivalente a 1,61 vezes o dos animais de pastejo restrito e tiveram ganho de peso de corpo vazio médio diário de 516,4 g, com um ganho estimado de 432,5 kg por hectare, estando dentro da faixa de ganho de peso verificada para capim-elefante no Brasil. O consumo de energia metabolizável por unidade de tamanho metabólico manteve-se estável nos três primeiros períodos, elevando-se nos dois últimos períodos, em que ocorreram os maiores ganhos de peso dos animais. Quatro horas diárias de pastejo garantiram consumo próximo à mantença.The research was conducted in the experimental farm of the EPAMIG-Leopoldina, MG, to evaluate intake of elephantgrass, the effectiveness of limiting grazing time to four daily hours for keeping intake close to maintenance level, and the weight gain of thirty-six steers during five successive periods of thirty-six days, during the rainy season. The treatments were: free access to pasture (unlimited grazing and restricted grazing. The availability of green dry matter varied from 4.0 to 7.8 kg/100kg LW. The average daily weight gain of animals with free access to pasture was 516.5 g and their dry matter intake corresponded to 1.61 times that from the restricted grazing ones. The estimated gain per hectare was 423.5 kg, which is within the range reported for elephantgrass in Brasil. Metabolizable energy intake, per

  14. An Intelligent Fleet Condition-Based Maintenance Decision Making Method Based on Multi-Agent

    Directory of Open Access Journals (Sweden)

    Bo Sun

    2012-01-01

    Full Text Available According to the demand for condition-based maintenance online decision making among a mission oriented fleet, an intelligent maintenance decision making method based on Multi-agent and heuristic rules is proposed. The process of condition-based maintenance within an aircraft fleet (each containing one or more Line Replaceable Modules based on multiple maintenance thresholds is analyzed. Then the process is abstracted into a Multi-Agent Model, a 2-layer model structure containing host negotiation and independent negotiation is established, and the heuristic rules applied to global and local maintenance decision making is proposed. Based on Contract Net Protocol and the heuristic rules, the maintenance decision making algorithm is put forward. Finally, a fleet consisting of 10 aircrafts on a 3-wave continuous mission is illustrated to verify this method. Simulation results indicate that this method can improve the availability of the fleet, meet mission demands, rationalize the utilization of support resources and provide support for online maintenance decision making among a mission oriented fleet.

  15. On condition based maintenance policy

    Directory of Open Access Journals (Sweden)

    Jong-Ho Shin

    2015-04-01

    Full Text Available In the case of a high-valuable asset, the Operation and Maintenance (O&M phase requires heavy charges and more efforts than the installation (construction phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs, we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

  16. A knowledge-based assistant for valve maintenance planning

    International Nuclear Information System (INIS)

    Winter, M.J.; Danofsky, R.A.; Spinrad, B.I.; Howard, K.

    1987-01-01

    A knowledge-based program is being developed to assist engineers in maintenance planning for safety related, motor-operated valves at a boiling water reactor. The purpose of this project is to develop the general framework for a prototype system that demonstrates the capabilities for diagnosing valve symptoms and prescribing corrective maintenance, completing a portion of the Corrective Maintenance Action Request (CMAR) form which must be prepared for each job, and managing an interactive valve data base. Minimizing user input and providing output in a form that is familiar to the maintenance planning engineer are important goals for the program. This paper describes the present features of the valve maintenance advisory system which is currently being tested

  17. Estudo comparativo de sete diferentes modelos estatísticos para a característica ganho de peso em bovinos de corte

    Directory of Open Access Journals (Sweden)

    Fernandes Henrique Dorneles

    2000-01-01

    Full Text Available Foram analisadas uni e bivariadamente as características ganho de peso do nascer à desmama e ganho de peso pós-desmama de 4883 animais, filhos de 328 touros da raça Charolês, com o objetivo de comparar diferentes modelos ao considerado mais completo, porém de mais difícil aplicabilidade. Os modelos estudados foram o MA1, modelo animal que inclui os efeitos genético direto do animal e genético materno; MA2, modelo animal que inclui o efeito aditivo direto do animal e o efeito de ambiente permanente; MA3, que inclui os três efeitos já citados (considerado o "melhor"; MA4, modelo animal que inclui apenas o efeito aditivo direto; MTV, modelo touro-vaca que inclui o efeito genético direto do pai, além dos efeitos genéticos materno e de ambiente permanente; MT1, modelo touro com efeito genético aditivo direto do pai e efeito de ambiente permanente; e MT2, modelo touro com apenas efeito direto do pai. Com base nos resultados, observou-se diferença estatística somente entre os modelos MA4 e MT2, em relação ao MA3, para o ganho de peso do nascer à desmama. Concluiu-se que, para a característica pré-desmama, a inclusão de pelo menos um dos efeitos (genético materno ou ambiental foi indicada, enquanto para a pós-desmama até mesmo modelos mais simples como o MA4 e o MT2 podem ser utilizados para substituir o modelo mais complexo (MA3. As análises bivariadas são indicadas, principalmente por apresentarem as correlações genéticas entre as características.

  18. Reliability-based performance simulation for optimized pavement maintenance

    International Nuclear Information System (INIS)

    Chou, Jui-Sheng; Le, Thanh-Son

    2011-01-01

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: →A novel algorithm using multi-objective particle swarm optimization technique. → Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. → A probabilistic model for regression parameters is employed to assess reliability-based performance. → The proposed approach can help decision makers to optimize roadway maintenance plans.

  19. Reliability-based performance simulation for optimized pavement maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Jui-Sheng, E-mail: jschou@mail.ntust.edu.tw [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China); Le, Thanh-Son [Department of Construction Engineering, National Taiwan University of Science and Technology (Taiwan Tech), 43 Sec. 4, Keelung Rd., Taipei 106, Taiwan (China)

    2011-10-15

    Roadway pavement maintenance is essential for driver safety and highway infrastructure efficiency. However, regular preventive maintenance and rehabilitation (M and R) activities are extremely costly. Unfortunately, the funds available for the M and R of highway pavement are often given lower priority compared to other national development policies, therefore, available funds must be allocated wisely. Maintenance strategies are typically implemented by optimizing only the cost whilst the reliability of facility performance is neglected. This study proposes a novel algorithm using multi-objective particle swarm optimization (MOPSO) technique to evaluate the cost-reliability tradeoff in a flexible maintenance strategy based on non-dominant solutions. Moreover, a probabilistic model for regression parameters is employed to assess reliability-based performance. A numerical example of a highway pavement project is illustrated to demonstrate the efficacy of the proposed MOPSO algorithms. The analytical results show that the proposed approach can help decision makers to optimize roadway maintenance plans. - Highlights: > A novel algorithm using multi-objective particle swarm optimization technique. > Evaluation of the cost-reliability tradeoff in a flexible maintenance strategy. > A probabilistic model for regression parameters is employed to assess reliability-based performance. > The proposed approach can help decision makers to optimize roadway maintenance plans.

  20. Application of condition based maintenance to nuclear power plants

    International Nuclear Information System (INIS)

    Sonoda, Yukio; Nakano, Tomohito; Shimizu, Shunichi; Iida, Jun; Atomura, Masakazu; Abe, Masahiro

    2002-01-01

    Device Karte management system which supports application of condition based maintenance to nuclear power plants has been developed. The purpose of this system is to support maintenance personnel in device inspection scheduling based on operating condition monitoring and maintenance histories. There are four functions: field database, degradation estimation, inspection time decision and maintenance planning. The authors have been applying this system to dozens of devices of Onagawa Nuclear Power Station Unit No. 1 for one year. This paper represents the system concept and its application experiences. (author)

  1. Virtual maintenance technology for reactor system based on PPR technology

    International Nuclear Information System (INIS)

    Wu Yaxiang; Ma Baiyong

    2009-01-01

    Based on the Product, Process and Resources (PPR) technology, the establishing technology of virtual maintenance environment for the reactor system and the process structure tree for virtual maintenance is studied, and the flow for the maintainability design and simulation for reactor system is put forward. Based on the subsection simulation of maintenance process and layered design of maintenance actions, the leveled structure of the reactor system virtual maintenance task is studied. The relation for the data of product, process and resource is described by Plan Evaluation and Review Technology (PERT) diagram to define the maintenance operation. (authors)

  2. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    For offshore wind turbines, maintenance costs are substantial due to a large number of component failures. In addition to the repair costs, equipment costs and lost production costs are large due to limited accessibility to the turbines. In order to reduce the costs, preventive methods can be used......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... maintenance costs, and many studies have also been published for preventive maintenance. However, an important part is the modeling of the relationship between maintenance and reliability, which is typically not modeled in a consistent way. Therefore, the methods cannot be used directly for optimal...

  3. Influencing factors for condition-based maintenance in railway tracks using knowledge-based approach

    NARCIS (Netherlands)

    Jamshidi, A.; Hajizadeh, S.; Naeimi, M.; Nunez Vicencio, Alfredo; Li, Z.

    2017-01-01

    In this paper, we present a condition-based maintenance decision method using
    knowledge-based approach for rail surface defects. A railway track may contain a considerable number of surface defects which influence track maintenance decisions. The proposed method is based on two sets of

  4. Energy partition for maintenance and weight gain in Nellore and crossbred steers finished under grazing Partição de energia para mantença e ganho em novilhos nelores e mestiços terminados a pasto

    Directory of Open Access Journals (Sweden)

    N.F. Sant´Ana

    2011-04-01

    Full Text Available The objective of this work was to estimate net energy (NEm and metabolizable energy (MEm requirements for maintenance and efficiency of use of metabolizable energy for maintanence (k m and gain (k g of grazing Nellore and crossbred steers. It was used 24 castrated steers, 12 Nellore breed (386 kg SBW and 12 ½ Limousin-Nelore crossbred (397 kg SBW. The comparative slaughter method was used. In each genetic group, animals were grouped in three similar groups: reference; restrict feeding and ad libitum feeding. The reference group was slaughtered in the beginning of the experiment whereas the others were slaughtered at the end of it. During the 104 days of the experimental period, the group under restrict feeding had access to pastures for 3.5 hours daily whereas the group with ad libitum feeding remained on pasture full time. Forage intake was estimated in two trials by using the double-indicator method. Values of NEm, MEm, k m and k g were estimated on the basis of empty body weight (EBW through linear and non-linear model fitting. Requirements of NEm and MEm did not differ among Nellore and crossbred animals. In the linear model, the following results were obtained: Requirements of NEm = 86 kcal/kg0.75; requirements of MEm = 136 kcal/kg0.75 and k m = 0.63. Kg value was higher for Nellore animals (0.39 than for crossbred animals (k g = 0.33. Requirement of net energy of maintenance does not differ among grazing Nellores and ½ European-Nellore crossbred. For the same body weight, Nellore animals present greater fat proportion in gain composition than ½European-Nelore crossbred.Este trabalho foi conduzido com o objetivo de estimar as exigências de energia líquida (ELm e metabolizável (EMm para mantença e as eficiências de utilização da energia metabolizável para mantença (k m e ganho (k g de novilhos nelores e mestiços a pasto. Foram utilizados 24 novilhos castrados, sendo 12 da raça Nelore (386 kg PCJ e 12 mestiços ½ Limousin

  5. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2009-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based lifecycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue, corrosion...

  6. Risk-based Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Nielsen, Jannie Jessen

    2011-01-01

    For offshore wind turbines, costs to Operation and Maintenance (OM) are substantial, and can be expected to increase when wind farms are placed at deeper water depths and in more harsh environments. Traditional strategies for OM include corrective and preventive (scheduled and condition...... statistics and costs of the different operations. The different OM strategies are described and compared in an illustrative example with focus on which types of information that are needed. Special focus is on comparison between risk-based maintenance strategies and the conventional maintenance planning...... and are often the driving mechanisms for failures / faults that need maintenance. Observations of the degree of damage can increase the reliability of predictions and decrease the costs of OM if integrated in a risk-based framework theoretically based on pre-posterior Bayesian decision theory. The mathematical...

  7. Maintenance Decision Making based on different types of data fusion

    OpenAIRE

    Galar, D.; Gustafson, A.; Tormos Martínez, Bernardo Vicente; Berges, Luis

    2012-01-01

    [EN] Over the last decade, system integration is applied more as it allows organizations to streamline business processes. A recent development in the asset engineering management is to leverage the investment already made in process control systems. This allows the operations, maintenance, and process control teams to monitor and determine new alarm level based on the physical condition data of the critical machines. Condition-based maintenance (CBM) is a maintenance philosophy base...

  8. Optimizing block-based maintenance under random machine usage

    NARCIS (Netherlands)

    de Jonge, Bram; Jakobsons, Edgars

    Existing studies on maintenance optimization generally assume that machines are either used continuously, or that times until failure do not depend on the actual usage. In practice, however, these assumptions are often not realistic. In this paper, we consider block-based maintenance optimization

  9. Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    2017-01-01

    Inspection and maintenance expenses cover a considerable part of the cost of energy from offshore wind turbines. Risk-based maintenance planning approaches are a powerful tool to optimize maintenance and inspection actions and decrease the total maintenance expenses. Risk-based planning is based...... on many input parameters, which are in reality often not completely known. This paper will assess the cost impact of this incomplete knowledge based on a case study following risk-based maintenance planning. The sensitivity study focuses on weather forecast uncertainties, incomplete knowledge about...... the needed repair time on the site as well as uncertainties about the operational range of the boat and helicopter used to access the broken wind turbine. The cost saving potential is estimated by running Crude Monte Carlo simulations. Furthermore, corrective and preventive (scheduled and condition...

  10. Composição do ganho e exigências de energia e proteína para ganho de peso em bovinos Nelore puros e mestiços Gain composition and net energy and protein requirements for weight gain in Nellore and crossbred cattle

    Directory of Open Access Journals (Sweden)

    José Antônio de Freitas

    2006-06-01

    Full Text Available Objetivou-se estimar a composição do ganho e as exigências de energia e proteína para ganho de peso em bovinos Nelore puros e mestiços. Utilizaram-se 60 bovinos machos (Nelore, F1 Nelore x Angus, F1 Nelore x Pardo-Suíço e F1 Nelore x Simental não-castrados, com 10 a 11 meses de idade e peso médio inicial de 286, 309, 333 e 310 kg, respectivamente. O delineamento utilizado foi o inteiramente casualizado, com quatro grupos genéticos, submetidos a quatro níveis de concentrado na ração (30, 40, 60 e 70%. Três animais de cada grupo genético foram abatidos ao início do experimento e serviram como referência na determinação da composição corporal inicial. As exigências líquidas de proteína e energia para ganho de 1 kg de peso corporal vazio (PCV foram estimadas pela equação Y' = a. b. X (b-1, em que a e b são os coeficientes das equações de regressão dos conteúdos de energia e proteína e X, o PCV dos animais. O teste de identidade de modelos não-lineares indicou não haver diferenças entre grupos genéticos para as exigências de energia e proteína para ganho de peso. Verificou-se decréscimo de 10,6% nas exigências de proteína e elevação de 37,8% nas exigências de energia para ganho de peso entre 250 e 550 kg, o que está relacionado à elevação do teor de gordura e à redução no teor de proteína com o acréscimo no PCV. As exigências líquidas de proteína e energia para ganho de peso foram estimadas em 143,5 g e 4,7 Mcal para o peso vivo de 450 kg.The objectives of this trial were to estimate gain composition and energy and protein requirements for weight gain of purebred and crossbred Nellore. Sixty young bulls averaging 10 to 11 months of age from four genetic groups: Nellore, F1 Nellore x Angus, F1 Nellore x Brown Swiss and F1 Nellore x Simental and initial average body weights of 286, 309, 333 and 310 kg, respectively, were used in this study. A completely randomized design was adopted and bulls from

  11. The-Abstraction-Hierarchy-based Mobile PC Display Design for NPP Maintenance

    International Nuclear Information System (INIS)

    Kim, In; Kim, Bo Gyung; Seong, Poong Hyun; Ha, Jun Su

    2010-01-01

    Recently, the importance of effective maintenance in nuclear power plants (NPPs) has been emphasized and research into effective maintenance by adopting mobile maintenance aids (MMAs) have been attempted. For improved and effective use of an MMA display design method based on abstraction hierarchy (AH) is proposed and its design considerations are discussed in this study. Six levels of abstraction hierarchy are proposed in this paper to classify the maintenance information. By classifying and organizing maintenance information using AH, maintenance information can be used effectively by users with either high or low levels of expertise. When information classification has been finished, the information for MMA design is selected and designed. With the considerations of MMA design analysis and guidelines, AH-based MMA is designed for the maintenance tasks. An experiment is conducted using the AH-based MMA in order to estimate the effectiveness of the proposed method for the maintenance tasks and to identify design considerations to enhance the proposed MMAs. The result indicated that an AH-based manual was more effective than a conventional manual in terms of task completion time and number of errors. The workload for the AH-based manual was estimated less than the conventional manual for subjects with low level of expertise. As the level of expertise increases, subjects tended to follow more abstract information while the number of navigations decreased. It is believed that when mobile devices become pervasive in NPP maintenance fields, AH-model applied MMAs can be used as an effective maintenance supporting tool

  12. Risk based maintenance: Resource requirements and organizational challenges

    International Nuclear Information System (INIS)

    Weerakkody, S.D.

    2000-01-01

    10CFR50.65 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants' required licensees to monitor the performance or condition of structures, systems, or components (SSCs) against licensee established goals, in a manner sufficient to provide reasonable assurance that such SSCs are capable of fulfilling their intended functions. The goals were required to be commensurate with safety significance and operating experience. Northeast Utilities relied upon PRAs to implement 10CFR50.65, which is also referred to as the 'Maintenance Rule'. The Maintenance Rule changed some aspects of maintenance of structures, systems, and components (SSC) at nuclear power plants. One objective of the rule was to focus the maintenance resources based on risk significance of components. This paper will discuss the organizational challenges and resource requirements associated with implementation of the Maintenance Rule at nuclear facilities that are supported by the Northeast Utilities Services Company (NUSCo). The paper will discuss (a) how these challenges were addressed, (b) the resources required for ongoing efforts to support the Maintenance Rule, and (c) several key safety benefits derived from the implementation of the Maintenance Rule. (author)

  13. Ganho de força e função em idosos por treino isométrico com e sem resposta visual

    Directory of Open Access Journals (Sweden)

    Mauricio Ferraz de Arruda

    2014-07-01

    Full Text Available INTRODUÇÃO: A remediação das alterações fisiológicas que sofrem os idosos é um problema com o qual a saúde pública se defronta com frequência. A premência deste trabalho está em minimizar essa remediação e as alterações que ela propicia no âmbito músculo-esquelético, por meio de um trabalho físico condicionante, que busca aumentar a qualidade de vida dessa população. OBJETIVO: Avaliar o efeito do treinamento físico sob duas ópticas de comando terapêutico, com e sem resposta visual por unidade de pressão, bem como seus possíveis benefícios quanto ao ganho de torque muscular, inerente à funcionalidade citada no questionário de qualidade de vida SF-36, avaliando assim a influência do treinamento físico. MÉTODOS: A avaliação foi realizada por meio de um questionário de qualidade de vida SF-36 e do teste de levantar e sentar, além da aferição da força por meio do esfigmomanômetro modificado (EM. O individuo foi submetido a duas sessões semanais de exercícios durante um mês, com o protocolo de treinamento que constou de três séries de 10 repetições na cadeira flexora e extensora para ambos os joelhos de maneira isométrica. Os dados foram estatisticamente analisados pela análise de variância e desvio padrão (p < 0,05 e correlação de Pearson (p < 0,05. RESULTADOS: Notou-se melhora no quadro geral dos idosos, sendo que houve aumento estatisticamente significante no estado geral de saúde, redução da limitação por aspectos físicos, redução da dor e no aumento da capacidade funcional, bem como um incremento da força de flexão e extensão, que teve reflexo positivo no teste funcional. CONCLUSÃO: Houve correlação extremamente válida entre o ganho de força em flexão com o teste de sentar e levantar, com o qual, apesar de ganho menor comparado ao ganho de força em extensão, estabeleceu-se correlação com o ganho funcional, independentemente da resposta visual ao exercício.

  14. Development of a knowledge-based information management system for plant maintenance

    International Nuclear Information System (INIS)

    Yim, Hyung Sang; Park, Young Jae; Lee, Sang Min; Choi, Jae Boong; Kim, Young Jin; Roh, Eun Chul; Lee, Byung Ine

    2003-01-01

    Recently, the importance of Plant Maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as Risk-Based Inspection(RBI), Fitness For Service guidelines(FFS), Plant Lifecycle Management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance

  15. Development of a knowledge-based information management system for plant maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Hyung Sang; Park, Young Jae; Lee, Sang Min; Choi, Jae Boong; Kim, Young Jin [Sungkyunkwan Univ., Seoul (Korea, Republic of); Roh, Eun Chul; Lee, Byung Ine [Pohang Iron and Steel Company, Pohang (Korea, Republic of)

    2003-07-01

    Recently, the importance of Plant Maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as Risk-Based Inspection(RBI), Fitness For Service guidelines(FFS), Plant Lifecycle Management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance.

  16. Clustering condition-based maintenance for a multi-unit system with aperiodic inspections

    NARCIS (Netherlands)

    Olde Keizer, Minou C.A.; Teunter, Ruud H.; Podofillini, Luca; Sudret, Bruno; Stojadinović, Božidar; Zio, Enrico; Kröger, Wolfgang

    2015-01-01

    Condition-Based Maintenance (CBM) is a predictive maintenance strategy, which bases the maintenance scheduling on condition measurements of the components. In this paper, we continue work on the CBM optimization approach proposed by Castanier, B., A. Grall & C. Bérenguer (2005). A condition-based

  17. The International Coal Statistics Data Base program maintenance guide

    International Nuclear Information System (INIS)

    1991-06-01

    The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig

  18. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  19. Risk-Based Operation and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær

    to oil and gas structures. In addition, condition monitoring systems are often available, and the information should be taken into account when making decisions. In this thesis, methods for risk-based maintenance planning using Bayesian methods are investigated, with the aim of making optimal decisions......, but presently maintenance is not planned using advanced methods taking all available information into account in a consistent manner. Maintenance decisions can be made based on risk-based methods, where the total expected life cycle costs are minimized. Methods have been developed for assessing the corrective...... considering all available information. First, a theoretical damage model is formulated, the model is then updated using condition monitoring data, and the updated model is used as basis for risk-based decision making. Several approaches for solving the decision problems have been considered: various types...

  20. Ganho de peso na recria e desempenho reprodutivo de novilhas acasaladas com sobreano Live weight gain in the rearing and reproductive performance of yearling beef heifers mated

    Directory of Open Access Journals (Sweden)

    Yuri Regis Montanholi

    2004-12-01

    Full Text Available O objetivo deste trabalho foi avaliar os efeitos da intensidade do ganho de peso no período de recria, dos 13 aos 18 meses de idade, sobre a taxa de prenhez de novilhas de corte acasaladas com o sobreano durante o outono. Os tratamentos foram constituídos de 30 novilhas com peso médio de 208 kg, submetidas a ganho médio de 0,595 kg dia-1 (G600, 41 novilhas com peso médio de 197 kg submetidas a ganho médio de 0,656 kg dia-1 (G700 e 58 novilhas com peso médio de 181 kg submetidas a ganho médio de 0,723 kg dia-1 (G800. Foram avaliados os efeitos dos tratamentos sobre peso, escore de trato reprodutivo e taxa de prenhez. As taxas de prenhez foram 30,0% 47,8% e 50,0% para os grupos G600, G700 e G800, respectivamente, não existindo diferença significativa entre os grupos. Os grupos G700 e G800, submetidos à maior taxa de ganho de peso, apresentaram maiores valores de escore de trato reprodutivo em relação ao G600 no início da estação de monta. Novilhas com escores mais elevados apresentaram tendência a maior taxa de prenhez. A taxa de prenhez esteve associada à intensidade de ganho de peso na recria independentemente das variações de peso no acasalamento.The objective of this work was to evaluate the effects of growth rate during rearing period, from 13 to 18 months, on pregnancy rate of beef heifers mated at yearling during autumn. Treatments consisted of 30 heifers weighing on average 208 kg submitted to average growth rate of 0.595 kg day-1 (G600, 41 heifers averaging 197 kg with average growth rate of 0.656 kg day-1 (G700 and 58 heifers with 181 kg with average growth rate of 0.723 kg day-1 (G800. Treatment effects were determined on body weight, reproductive tract score and pregnancy rate. Pregnancy rate was 30.0% 47.8% and 50.0%, respectively, for G600, G700 and G800, without significant differences among groups. Treatments G700 and G800, with large growth rates, showed higher values of reproductive tract score than G600 at

  1. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  2. A condition-based maintenance policy for stochastically deteriorating systems

    International Nuclear Information System (INIS)

    Grall, A.; Berenguer, C.; Dieulle, L.

    2002-01-01

    We focus on the analytical modeling of a condition-based inspection/replacement policy for a stochastically and continuously deteriorating single-unit system. We consider both the replacement threshold and the inspection schedule as decision variables for this maintenance problem and we propose to implement the maintenance policy using a multi-level control-limit rule. In order to assess the performance of the proposed maintenance policy and to minimize the long run expected maintenance cost per unit time, a mathematical model for the maintained system cost is derived, supported by the existence of a stationary law for the maintained system state. Numerical experiments illustrate the performance of the proposed policy and confirm that the maintenance cost rate on an infinite horizon can be minimized by a joint optimization of the maintenance structure thresholds, or equivalently by a joint optimization of a system replacement threshold and the aperiodic inspection schedule

  3. Maintenance Decision Based on Data Fusion of Aero Engines

    Directory of Open Access Journals (Sweden)

    Huawei Wang

    2013-01-01

    Full Text Available Maintenance has gained a great importance as a support function for ensuring aero engine reliability and availability. Cost-effectiveness and risk control are two basic criteria for accurate maintenance. Given that aero engines have much condition monitoring data, this paper presents a new condition-based maintenance decision system that employs data fusion for improving accuracy of reliability evaluation. Bayesian linear model has been applied, so that the performance degradation evaluation of aero engines could be realized. A reliability evaluation model has been presented based on gamma process, which achieves the accurate evaluation by information fusion. In reliability evaluation model, the shape parameter is estimated by the performance degradation evaluation result, and the scale parameter is estimated by failure, inspection, and repair information. What is more, with such reliability evaluation as input variables and by using particle swarm optimization (PSO, a stochastic optimization of maintenance decision for aircraft engines has been presented, in which the effectiveness and the accuracy are demonstrated by a numerical example.

  4. Model based decision support for planning of road maintenance

    NARCIS (Netherlands)

    van Harten, Aart; Worm, J.M.; Worm, J.M.

    1996-01-01

    In this article we describe a Decision Support Model, based on Operational Research methods, for the multi-period planning of maintenance of bituminous pavements. This model is a tool for the road manager to assist in generating an optimal maintenance plan for a road. Optimal means: minimising the

  5. Análise da planicidade do ganho de amplificadores híbridos com bombeamento residual

    Directory of Open Access Journals (Sweden)

    Márcia da Mota Jardim Martini

    2013-11-01

    Full Text Available Neste trabalho são estudadas configurações de amplificadores híbridos constituídos por amplificador Raman em cascata com Erbium Doped Fiber Amplifier (EDFA (Amplificador com fibra dopada com Érbio com reciclagem de bombeamento residual Raman, a serem utilizados na expansão da capacidade de sistemas de comunicações óticas utilizando Wavelength Division Multiplexing (WDM (Multiplexação por Divisão de Comprimento de Onda. Foi realizada, mediante simulação utilizando pacote comercial, análise do desempenho de diferentes configurações de amplificadores híbridos Raman+EDFA, em termos do ganho global e ondulação (ripple - variação do ganho dos canais de entrada. A flexibilidade do perfil espectral do amplificador Raman pode ser combinada com a alta capacidade de potência de saída do EDFA para obter amplificadores híbridos com banda larga. Este trabalho aplica a técnica de otimização de lasers de bombeamento de amplificadores Raman aplicada em amplificadores híbridos Raman+EDFA para aplicações em sistemas WDM. Os resultados preliminares demonstram que o amplificador híbrido Raman+EDFA com reciclagem de bombeamento residual Raman combinado com uma seleção apropriada de potências e comprimentos de onda dos lasers de bombeamento Raman, possibilita a obtenção de amplificadores híbridos banda larga com maior eficiência de conversão de potência, ganho alto e plano.Palavras-chave: Amplificadores Raman. EDFA. Amplificadores híbridos. Bombeamento residual. WDM.Gain ripple analysis on hybrid amplifiers with recycled pumpAbstract In this work different configurations of hybrid amplifiers are studied, made by a Raman amplifier followed by an EDFA. Such amplifiers can be used to increase the transmission capacity in optical communication systems. The performance of different hybrid EDFA+Raman amplifiers is obtained using commercial software. Their performance is analyzed in terms of the global gain and ripple. The

  6. A basic condition-based maintenance strategy for air-cooled turbine generators

    International Nuclear Information System (INIS)

    Laird, T.; Griffith, G.; Hoof, M.

    2005-01-01

    This paper discusses the methods of using condition-based maintenance (CBM) for turbine generators. Even though it is focused on the maintenance strategy for air-cooled generators, all types of power producers can realize benefits from a better maintenance strategy at lower costs. A reliable assessment of the actual unit condition requires detailed knowledge of the unit design, operational weaknesses, cost of maintenance and operational capabilities. (author)

  7. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  8. Performance-based maintenance of gas turbines for reliable control of degraded power systems

    Science.gov (United States)

    Mo, Huadong; Sansavini, Giovanni; Xie, Min

    2018-03-01

    Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce

  9. Statistical Learning Framework with Adaptive Retraining for Condition-Based Maintenance

    International Nuclear Information System (INIS)

    An, Sang Ha; Chang, Soon Heung; Heo, Gyun Young; Seo, Ho Joon; Kim, Su Young

    2009-01-01

    As systems become more complex and more critical in our daily lives, the need for the maintenance based on the reliable monitoring and diagnosis has become more apparent. However, in reality, the general opinion has been that 'maintenance is a necessary evil' or 'nothing can be done to improve maintenance costs'. Perhaps these were true statements twenty years ago when many of the diagnostic technologies were not fully developed. The developments of microprocessor or computer based instrumentation that can be used to monitor the operating condition of plant equipment, machinery and systems have provided the means to manage the maintenance operation. They have provided the means to reduce or eliminate unnecessary repairs, prevent catastrophic machine failures and reduce the negative impact of the maintenance operation on the profitability of manufacturing and production plants. Condition-based maintenance (CBM) techniques help determine the condition of in-service equipment in order to predict when maintenance should be performed. Most of the statistical learning techniques are only valid as long as the physics of a system does not change. If any significant change such as the replacement of a component or equipment occurs in the system, the statistical learning model should be re-trained or re-developed to adapt the new system. In this research, authors will propose a statistical learning framework which can be applicable for various CBMs, and the concept of the adaptive retraining technique will be described to support the execution of the framework so that the monitoring system does not need to be re-developed or re-trained even though there are any significant changes in the system or component

  10. Conteúdo corporal e exigências líquidas e dietéticas de macroelementos minerais (Ca, P, Mg, Na e K de novilhos mestiços Holandês-Gir em ganho compensatório

    Directory of Open Access Journals (Sweden)

    Almeida Maria Izabel Vieira de

    2001-01-01

    Full Text Available Foram utilizados 39 novilhos mestiços Holandês-Gir, com o objetivo de avaliar a influência do ganho compensatório sobre o conteúdo corporal e as exigências líquidas e dietéticas de cálcio, fósforo, magnésio, sódio e potássio de bovinos. Trinta animais foram submetidos à alta pressão de pastejo, enquanto nove tiveram oferta ilimitada de pasto (grupo ganho contínuo, durante 114 dias, após o qual seis animais do primeiro grupo e três do segundo grupo foram abatidos e os restantes, confinados. Entre os animais do primeiro grupo, 12 receberam alimentação ad libitum (grupo ganho compensatório e 12 receberam alimento 15% acima da mantença (grupo mantença, enquanto os seis animais do grupo ganho contínuo receberam a mesma dieta ad libitum. Foram ajustadas equações de regressão do logaritmo do conteúdo corporal dos minerais, em função do logaritmo do peso corporal vazio (PCVZ. As exigências de minerais não diferiram quanto ao tratamento, e as exigências líquidas para ganho de 1 kg PCVZ variaram de 10,04 a 12,38 g para cálcio, 9,33 a 9,41 g para fósforo, 0,50 a 0,38 g para magnésio, 1,22 a 1,07 g para sódio e 2,24 a 2,75 g para potássio, para novilhos com pesos entre 150 e 450 kg, respectivamente. As exigências dietéticas, para ganho de 1 kg de peso vivo, variaram de 15,88 a 25,68 g para cálcio, 16,62 a 10,35 g para fósforo, 5,12 a 9,82 g para magnésio, 2,25 a 4,35 g para sódio e 18,23 a 49,18 g para potássio.

  11. Risk-Based Predictive Maintenance for Safety-Critical Systems by Using Probabilistic Inference

    Directory of Open Access Journals (Sweden)

    Tianhua Xu

    2013-01-01

    Full Text Available Risk-based maintenance (RBM aims to improve maintenance planning and decision making by reducing the probability and consequences of failure of equipment. A new predictive maintenance strategy that integrates dynamic evolution model and risk assessment is proposed which can be used to calculate the optimal maintenance time with minimal cost and safety constraints. The dynamic evolution model provides qualified risks by using probabilistic inference with bucket elimination and gives the prospective degradation trend of a complex system. Based on the degradation trend, an optimal maintenance time can be determined by minimizing the expected maintenance cost per time unit. The effectiveness of the proposed method is validated and demonstrated by a collision accident of high-speed trains with obstacles in the presence of safety and cost constrains.

  12. DADOS DE UMA PROVA DE GANHO DE PESO PARA SELEÇÃO DE REPRODUTORES BOVINOS DE CORTE FEEDING-TEST DATA FOR BEEF CATTLE BULLS SELECTION

    Directory of Open Access Journals (Sweden)

    José Magno Pato

    2007-09-01

    Full Text Available

    O presente trabalho foi realizado em Goiânia - Goiás e teve como objetivos iniciar a seleção de reprodutores através do "feeding-test" e verificar possíveis diferenças de ganhos em peso e pesos finais entre as raças Gir e Nelore. Foram utilizados 48 bezerros controlados e submetidos às mesmas condições de manejo e alimentação: 50% de milho desintegrado (espiga inteira, 25% de fubá de milho, 20% de farelo de algodão e 5% de feno de alfafa. O experimento durou 140 dias e demonstrou que, em termos de ganho e velocidade de ganho em peso, 50% dos animais estavam aptos para a reprodução. Observou-se que existem grandes diferenças de pesos e ganhos em peso tanto dentro quanto entre as raças. Os animais da raça Nelore superam os da raça Gir em peso inicial (198,4 x 178,9 kg, ganho em peso (114,3 x 104,9 kg, mas a significância estatística só foi atingida para os pesos finais. Outras provas deverão ser realizadas, corrigindo-se as falhas aqui apontadas, e trarão certamente melhores informações.

    The present work was carried out in Goiânia - Goiás with the objectives to start in selection of bulls through weights differences between Gir and Nelore breeds. Forty-eight controlled calves were used and submitted to the same conditions of control and feeding: 50% ground snapped corn, 25% corn meal, 20% cottonseed meal and 5% alfafa hay. The experiment lasted 140 days and showed that gain wise and speed gain weights, 60% of the animals was qualified to the reproduction. It was observed that great differences exist in weights and weight gains as in as much as between breeds. The animals of the Nelore’s breed surpass those of the Gir’s breed in initial weight (198.4 versus 178.9 kg, weight gain (114.3 versus 104.9 kg, final weight (312.7 versus 283.8 kg and adusted final weight (312.9 versus 283

  13. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    OpenAIRE

    Feng, Qiang; Li, Songjie; Sun, Bo

    2014-01-01

    A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance...

  14. Development of electromagnetic induction diagnostics technology for condition based maintenance

    International Nuclear Information System (INIS)

    Mawatari, Shingo; Oeda, Kaoru; Yatogi, Hideo; Fukuchi, Taira; Ueno, Tadashi

    2008-01-01

    In ROKKASHO Reprocessing Plant (below, called 'RRP'), we have applied Condition Based Maintenance to rotating equipment with vibration diagnostics technology. However, a few rotating equipment are difficult to diagnose definitely, because have structural problems which exercise vibrational noise to peripheral and be impossible to install vibratory sensor. Electromagnetic induction diagnostics technology which measure magnetic fields to eddy current which is induced to rotary through static magnetic field, diagnose deterioration behavior such as abrasion and crack. As a result, it has possibilities to clear above problems. Therefore, we started our basic researches with this technology for Condition Based Maintenance. In this paper, it introduces basic data about 'Non-seal pump' that have installed in RRP. As a result, this technology is a possibility that be able to detect Condition Based Maintenance. (author)

  15. Consistency maintenance for constraint in role-based access control model

    Institute of Scientific and Technical Information of China (English)

    韩伟力; 陈刚; 尹建伟; 董金祥

    2002-01-01

    Constraint is an important aspect of role-based access control and is sometimes argued to be the principal motivation for role-based access control (RBAC). But so far few authors have discussed consistency maintenance for constraint in RBAC model. Based on researches of constraints among roles and types of inconsistency among constraints, this paper introduces corresponding formal rules, rule-based reasoning and corresponding methods to detect, avoid and resolve these inconsistencies. Finally, the paper introduces briefly the application of consistency maintenance in ZD-PDM, an enterprise-oriented product data management (PDM) system.

  16. Bayesian based Diagnostic Model for Condition based Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    Operation and maintenance costs are a major contributor to the Levelized Cost of Energy for electricity produced by offshore wind and can be significantly reduced if existing corrective actions are performed as efficiently as possible and if future corrective actions are avoided by performing...... sufficient preventive actions. This paper presents an applied and generic diagnostic model for fault detection and condition based maintenance of offshore wind components. The diagnostic model is based on two probabilistic matrices; first, a confidence matrix, representing the probability of detection using...... for a wind turbine component based on vibration, temperature, and oil particle fault detection methods. The last part of the paper will have a discussion of the case study results and present conclusions....

  17. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    Directory of Open Access Journals (Sweden)

    Feng Qiang

    2014-04-01

    Full Text Available A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance process is described as a 3-layer multi-agent system (MAS model. A communication and reasoning strategy among the agents is put forward. A fleet maintenance personnel configuration algorithm is proposed based on contract net protocol (CNP. Finally, a fleet of 10 aircraft is studied for verification purposes. A mission type with 3 waves of continuous dispatch is imaged. Compared with the traditional methods that can just provide configuration results, the proposed method can provide optimal maintenance strategies as well.

  18. Costs of performance based maintenance for local roads: Case study Albania

    Science.gov (United States)

    Jokanović, Igor; Grujić, Bojana; Zeljić, Dragana; Grujić, Žarko; Svilar, Mila

    2017-12-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inadequate local roads maintenance in Albania is proposed to be solved by implementing performance based maintenance approach for which the costing exercise is presented within the paper.

  19. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  20. Risk Based Maintenance in Electricity Network Organisations

    NARCIS (Netherlands)

    Mehairjan, R.P.Y.

    2016-01-01

    Presently, maintenance management of assets in infrastructure utilities such as electricity, gas and water are widely undergoing changes towards new working environments. These are mainly driven against the background of stringent regulatory regimes, an ageing asset base, increased customer demands

  1. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  2. Advanced Maintenance Simulation by Means of Hand-Based Haptic Interfaces

    Science.gov (United States)

    Nappi, Michele; Paolino, Luca; Ricciardi, Stefano; Sebillo, Monica; Vitiello, Giuliana

    Aerospace industry has been involved in virtual simulation for design and testing since the birth of virtual reality. Today this industry is showing a growing interest in the development of haptic-based maintenance training applications, which represent the most advanced way to simulate maintenance and repair tasks within a virtual environment by means of a visual-haptic approach. The goal is to allow the trainee to experiment the service procedures not only as a workflow reproduced at a visual level but also in terms of the kinaesthetic feedback involved with the manipulation of tools and components. This study, conducted in collaboration with aerospace industry specialists, is aimed to the development of an immersive virtual capable of immerging the trainees into a virtual environment where mechanics and technicians can perform maintenance simulation or training tasks by directly manipulating 3D virtual models of aircraft parts while perceiving force feedback through the haptic interface. The proposed system is based on ViRstperson, a virtual reality engine under development at the Italian Center for Aerospace Research (CIRA) to support engineering and technical activities such as design-time maintenance procedure validation, and maintenance training. This engine has been extended to support haptic-based interaction, enabling a more complete level of interaction, also in terms of impedance control, and thus fostering the development of haptic knowledge in the user. The user’s “sense of touch” within the immersive virtual environment is simulated through an Immersion CyberForce® hand-based force-feedback device. Preliminary testing of the proposed system seems encouraging.

  3. Consistency maintenance for constraint in role-based access control model

    Institute of Scientific and Technical Information of China (English)

    韩伟力; 陈刚; 尹建伟; 董金祥

    2002-01-01

    Constraint is an important aspect of role-based access control and is sometimes argued to be the principal motivation for role-based access control (RBAC). But so far'few authors have discussed consistency maintenance for constraint in RBAC model. Based on researches of constraints among roles and types of inconsistency among constraints, this paper introduces correaponding formal rules, rulebased reasoning and corresponding methods to detect, avoid and resolve these inconsistencies. Finally,the paper introduces briefly the application of consistency maintenance in ZD-PDM, an enterprise-ori-ented product data management (PDM) system.

  4. Knowledge Management for Large Scale Condition Based Maintenance

    Data.gov (United States)

    National Aeronautics and Space Administration — This presentation will review the use of knowledge management in the development and support of Condition Based Maintenance (CBM) systems for complex systems with...

  5. Risk-Based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    Operation and maintenance (O&M) are large contributors to the cost of energy for offshore wind turbines. Optimal planning of O&M should include use of inspections and monitoring results to make decisions that minimize the expected costs through the lifetime of the structures. For offshore...... structures it is especially important because of the dependence on weather windows for inspections and repairs to be possible. A model has been developed to estimate the expected costs to corrective and condition based maintenance for a wind turbine with a single component. The deterioration of the component...... is simulated, and the expected costs are found for different strategies. An application example shows that condition based maintenance has the potential of reducing the costs, and a risk based approach can be used to find the optimal strategy for O&M. Further the influence of failure rate and damage parameters...

  6. Aging based maintenance and reinvestment scheduling of electric distribution

    Energy Technology Data Exchange (ETDEWEB)

    Korpijarvi, J.

    2012-07-01

    The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented (orig.)

  7. Structuring AHP-based maintenance policy selection

    NARCIS (Netherlands)

    Goossens, Adriaan; Basten, Robertus Johannes Ida; Hummel, J. Marjan; van der Wegen, Leonardus L.M.

    2015-01-01

    We aim to structure the maintenance policy selection process for ships, using the Analytic Hierarchy Process (AHP). Maintenance is an important contributor to reach the intended life-time of capital technical assets, and it is gaining increasing interest and relevance. A maintenance policy is a

  8. PERFORMANCE-BASED CONTRACTING IN CONSTRUCTION PHASE AND MAINTENANCE PHASE OF PAVEMENT

    Science.gov (United States)

    Yoshida, Takeshi

    Performance-based contracting for pavement in Japan started as performance warranties in construction phase, in 1999. Recently, road agencies have recognized the applicability of this type of contracting in outsourcing of maintenance activities. The objectives of this study are to clarify the issues of performance specifying in construction phase and maintenance phase of pavement, and to propose measures to be taken. This paper, with the recognition that the life of each pavement depends on performance standards for various attributes, reviews domestic and foreign examples of performance-based contracting. A performance standard based on the average of current practices can enhance product quality and service life with a warranty contract. Repair thresholds and response time for each deficiency should be considered as performance standards in maintenance phase.

  9. Failure and Maintenance Analysis Using Web-Based Reliability Database System

    International Nuclear Information System (INIS)

    Hwang, Seok Won; Kim, Myoung Su; Seong, Ki Yeoul; Na, Jang Hwan; Jerng, Dong Wook

    2007-01-01

    Korea Hydro and Nuclear Power Company has lunched the development of a database system for PSA and Maintenance Rule implementation. It focuses on the easy processing of raw data into a credible and useful database for the risk-informed environment of nuclear power plant operation and maintenance. Even though KHNP had recently completed the PSA for all domestic NPPs as a requirement of the severe accident mitigation strategy, the component failure data were only gathered as a means of quantification purposes for the relevant project. So, the data were not efficient enough for the Living PSA or other generic purposes. Another reason to build a real time database is for the newly adopted Maintenance Rule, which requests the utility to continuously monitor the plant risk based on its operation and maintenance performance. Furthermore, as one of the pre-condition for the Risk Informed Regulation and Application, the nuclear regulatory agency of Korea requests the development and management of domestic database system. KHNP is stacking up data of operation and maintenance on the Enterprise Resource Planning (ERP) system since its first opening on July, 2003. But, so far a systematic review has not been performed to apply the component failure and maintenance history for PSA and other reliability analysis. The data stored in PUMAS before the ERP system is introduced also need to be converted and managed into the new database structure and methodology. This reliability database system is a web-based interface on a UNIX server with Oracle relational database. It is designed to be applicable for all domestic NPPs with a common database structure and the web interfaces, therefore additional program development would not be necessary for data acquisition and processing in the near future. Categorization standards for systems and components have been implemented to analyze all domestic NPPs. For example, SysCode (for a system code) and CpCode (for a component code) were newly

  10. Design of Mobile Operation and Maintenance System Based on Power GIS and GPS

    Directory of Open Access Journals (Sweden)

    Jing TAO

    2017-01-01

    Full Text Available In order to solve the low efficiency of operation and maintenance and the problems of management coordination caused by the coexistence of off-line operation and maintenance and multi system coexistence in current power telecommunication operation and maintenance, this paper proposes a mobile operation and maintenance system based on power GIS and GPS location technology. The system is based on the C/S architecture, and the mobile operation and maintenance terminal is connected with the operation and maintenance management terminal through wireless and wired network. In addition to meeting basic business requirements, the system integrates power GIS functions to visually demonstrate communication resources, personnel, and failures. The staff can use the wireless mobile terminal which integrated GPS module for to operate and maintain, and can locate accurately in real time.

  11. A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem

    DEFF Research Database (Denmark)

    Rahmati, Seyed Habib A.; Ahmadi, Abbas; Govindan, Kannan

    2018-01-01

    the level of the system optimization. By means of this equipment, managers can benefit from a condition-based maintenance (CBM) for monitoring and managing their system. The chief aim of the paper is to develop a stochastic maintenance problem based on CBM activities engaged with a complex applied......Integrated consideration of production planning and maintenance processes is a real world assumption. Specifically, by improving the monitoring equipment such as various sensors or product-embedded information devices in recent years, joint assessment of these processes is inevitable for enhancing...... production problem called flexible job shop scheduling problem (FJSP). This integrated problem considers two maintenance scenarios in terms of corrective maintenance (CM) and preventive maintenance (PM). The activation of scenario is done by monitoring the degradation condition of the system and comparing...

  12. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  13. A review on condition-based maintenance optimization models for stochastically deteriorating system

    International Nuclear Information System (INIS)

    Alaswad, Suzan; Xiang, Yisha

    2017-01-01

    Condition-based maintenance (CBM) is a maintenance strategy that collects and assesses real-time information, and recommends maintenance decisions based on the current condition of the system. In recent decades, research on CBM has been rapidly growing due to the rapid development of computer-based monitoring technologies. Research studies have proven that CBM, if planned properly, can be effective in improving equipment reliability at reduced costs. This paper presents a review of CBM literature with emphasis on mathematical modeling and optimization approaches. We focus this review on important aspects of the CBM, such as optimization criteria, inspection frequency, maintenance degree, solution methodology, etc. Since the modeling choice for the stochastic deterioration process greatly influences CBM strategy decisions, this review classifies the literature on CBM models based on the underlying deterioration processes, namely discrete- and continuous-state deterioration, and proportional hazard model. CBM models for multi-unit systems are also reviewed in this paper. This paper provides useful references for CBM management professionals and researchers working on CBM modeling and optimization. - Highlights: • A review on Condition-based maintenance (CBM) optimization models is presented. • The CBM models are classified based on the underlying deterioration processes. • Existing CBM models for both single- and multi-unit systems are reviewed. • Future essential research directions on CBM are identified.

  14. Analytical method for optimization of maintenance policy based on available system failure data

    International Nuclear Information System (INIS)

    Coria, V.H.; Maximov, S.; Rivas-Dávalos, F.; Melchor, C.L.; Guardado, J.L.

    2015-01-01

    An analytical optimization method for preventive maintenance (PM) policy with minimal repair at failure, periodic maintenance, and replacement is proposed for systems with historical failure time data influenced by a current PM policy. The method includes a new imperfect PM model based on Weibull distribution and incorporates the current maintenance interval T 0 and the optimal maintenance interval T to be found. The Weibull parameters are analytically estimated using maximum likelihood estimation. Based on this model, the optimal number of PM and the optimal maintenance interval for minimizing the expected cost over an infinite time horizon are also analytically determined. A number of examples are presented involving different failure time data and current maintenance intervals to analyze how the proposed analytical optimization method for periodic PM policy performances in response to changes in the distribution of the failure data and the current maintenance interval. - Highlights: • An analytical optimization method for preventive maintenance (PM) policy is proposed. • A new imperfect PM model is developed. • The Weibull parameters are analytically estimated using maximum likelihood. • The optimal maintenance interval and number of PM are also analytically determined. • The model is validated by several numerical examples

  15. Risk-based equipment removal guide for on-line maintenance at PSE ampersand G

    International Nuclear Information System (INIS)

    Knoll, A.; Smith, C.; Pollock, J.

    1995-01-01

    On-line maintenance plays an important role in achieving safe and reliable power generation in a nuclear power plant. However, maintenance, if not properly planned and performed, may also be an important contributor to plant risk. Therefore, plant-specific procedures are needed for equipment removal from service to enhance the benefits of on-line maintenance and minimize the risks involved. The problem is to identify and implement the most effective on-line maintenance policy in the form of a proceduralized guide to assure plant safety under various operation and maintenance constraints. This paper presents a methodology to develop plant-specific on-line maintenance strategies and acceptance criteria using a multivariate safety approach based on risk assessment. Based on plant-specific data as modeled in the individual plant evaluation (IPE) and the updated probabilistic safety assessment (PSA), the risk-based methodology is currently being applied to the development of proceduralized equipment removal guides at Hope Creek and Salem units 1 and 2 of Public Service Electric and Gas Company (PSE ampersand G)

  16. Heuristic hybrid game approach for fleet condition-based maintenance planning

    International Nuclear Information System (INIS)

    Feng, Qiang; Bi, Xiong; Zhao, Xiujie; Chen, Yiran; Sun, Bo

    2017-01-01

    The condition-based maintenance (CBM) method is commonly used to select appropriate maintenance opportunities according to equipment status over a period of time. The CBM of aircraft fleets is a fleet maintenance planning problem. In this problem, mission requirements, resource constraints, and aircraft statuses are considered to find an optimal strategy set. Given that the maintenance strategies for each aircraft are finite, fleet CBM can be treated as a combinatorial optimization problem. In this study, the process of making a decision on the CBM of military fleets is analyzed. The fleet CBM problem is treated as a two-stage dynamic decision-making problem. Aircraft are divided into dispatch and standby sets; thus, the problem scale is significantly reduced. A heuristic hybrid game (HHG) approach comprising a competition game and a cooperative game is proposed on the basis of heuristic rule. In the dispatch set, a competition game approach is proposed to search for a local optimal strategy matrix. A cooperative game method for the two sets is also proposed to ensure global optimization. Finally, a case study regarding a fleet comprising 20 aircraft is conducted, with the results proving that the approach efficiently generates outcomes that meet the mission risk-oriented schedule requirement. - Highlights: • A new heuristic hybrid game method for fleet condition-based maintenance is proposed. • The problem is simplified by hierarchical solving based on dispatch and standby set. • The local optimal solution is got by competition game algorithm for dispatch set. • The global optimal solution is got by cooperative game algorithm between two sets.

  17. Research of nuclear power plant in-service maintenance based on virtual reality

    International Nuclear Information System (INIS)

    Wang Yong; Kuang Weijun

    2015-01-01

    This paper presents a method of constructing nuclear power plant in-service maintenance virtual simulation scene and virtual maintenance process. Taking air baffles dismantling process of CAP1400(China Advanced Passive 1400) nuclear power plant as an instance, this paper discusses ergonomics, space analysis, time assessment based on virtual reality in the process of in-service maintenance. It demonstrates the advantage of using VR technology to design and verify in-service maintenance process of nuclear power plant compared to the conventional way. (author)

  18. Experience based reliability centered maintenance

    International Nuclear Information System (INIS)

    Haenninen, S.; Laakso, K.

    1993-03-01

    The systematic analysis and documentation of operating experiences should be included in a living NPP life management program. Failure mode and effects and maintenance effects analyses are suitable methods for analysis of the failure and corrective maintenance experiences of equipment. Combined use of the information on occurred functional failures and the decision tree logic of the reliability centered maintenance identifies applicable and effective preventive maintenance tasks of equipment in an old plant. In this study the electrical motor drives of closing and isolation valves (MOV) of TVO and Loviisa nuclear power plants were selected to serve as pilot study objects. The study was limited to valve drives having actuators manufactured by AUMA in Germany. The fault and maintenance history of MOVs from 1981 up to and including October 1991 in different safety and process systems at TVO 1 and 2 nuclear power units was at first analyzed in a systematic way. The scope of the components studied was 81 MOVs in safety-related systems and 127 other MOVs per each TVO unit. In the case of the Loviisa plant, the observation period was limited to three years, i.e. from February 1989 up to February 1992. The scope of the Loviisa 1 and 2 components studied was 44 respectively 95 MOVs. (25 refs., 22 figs., 8 tabs.)

  19. A condition-based maintenance policy for multi-component systems with a high maintenance setup cost

    NARCIS (Netherlands)

    Zhu, Q.; Peng, H.; Houtum, van G.J.J.A.N.

    2015-01-01

    Condition-based maintenance (CBM) is becoming increasingly important due to the development of advanced sensor and information technology, which facilitates the remote collection of condition data. We propose a new CBM policy for multi-component systems with continuous stochastic deteriorations. To

  20. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2013-01-01

    Full Text Available Facility maintenance management (FMM has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.

  1. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  2. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  3. Game-Theoretic Models for Usage-based Maintenance Contract

    Science.gov (United States)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  4. A Costing Analysis for Decision Making Grid Model in Failure-Based Maintenance

    Directory of Open Access Journals (Sweden)

    Burhanuddin M. A.

    2011-01-01

    Full Text Available Background. In current economic downturn, industries have to set good control on production cost, to maintain their profit margin. Maintenance department as an imperative unit in industries should attain all maintenance data, process information instantaneously, and subsequently transform it into a useful decision. Then act on the alternative to reduce production cost. Decision Making Grid model is used to identify strategies for maintenance decision. However, the model has limitation as it consider two factors only, that is, downtime and frequency of failures. We consider third factor, cost, in this study for failure-based maintenance. The objective of this paper is to introduce the formulae to estimate maintenance cost. Methods. Fish bone analysis conducted with Ishikawa model and Decision Making Grid methods are used in this study to reveal some underlying risk factors that delay failure-based maintenance. The goal of the study is to estimate the risk factor that is, repair cost to fit in the Decision Making Grid model. Decision Making grid model consider two variables, frequency of failure and downtime in the analysis. This paper introduces third variable, repair cost for Decision Making Grid model. This approaches give better result to categorize the machines, reduce cost, and boost the earning for the manufacturing plant. Results. We collected data from one of the food processing factories in Malaysia. From our empirical result, Machine C, Machine D, Machine F, and Machine I must be in the Decision Making Grid model even though their frequency of failures and downtime are less than Machine B and Machine N, based on the costing analysis. The case study and experimental results show that the cost analysis in Decision Making Grid model gives more promising strategies in failure-based maintenance. Conclusions. The improvement of Decision Making Grid model for decision analysis with costing analysis is our contribution in this paper for

  5. Performance-based maintenance procurement by Dutch housing associations

    NARCIS (Netherlands)

    Straub, A.

    2004-01-01

    OTB Research institute has established a long-term research program to performance-based maintenance procurement in the technical management of housing stock. Stakeholders: housing associations, contractors and the Dutch Building Research Foundation are directly involved in this research program.

  6. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  7. Avaliação de Perdas e Ganhos nas Decisões Financeiras: Uma Investigação à Luz da Prospect Theory

    Directory of Open Access Journals (Sweden)

    Adriana Fernandes Vasconcelos

    2014-04-01

    Full Text Available As anomalias registradas no mercado financeiro suscitaram o surgimento do ramo das finanças comportamentais, que investiga os aspectos emocionais e cognitivos na tomada de decisão. Nesse contexto, insere-se a Prospect Theory, que se apresenta como alternativa à Teoria da Utilidade Esperada. Esta pesquisa tem como objetivo testar as hipóteses da Prospect Theory a partir do questionário desenvolvido por Thaler e Johnson (1990, que avalia o comportamento dos indivíduos após eventos de perdas e ganhos financeiros. A amostra é composta por 1.152 alunos de graduação da cidade de Caruaru/PE. Os resultados encontrados são semelhantes aos da pesquisa de Thaler e Johnson (1990 e validam parcialmente a Teoria do Prospecto, mas com evidências menos acentuadas. Observou-se que os alunos tendem a não se guiar exclusivamente pelo resultado financeiro, de modo que suas decisões parecem influenciadas pelo componente emocional das perdas e ganhos. Subsidiariamente, verificou-se que as distinções de curso, idade, gênero e renda familiar não alteraram qualitativamente os resultados.

  8. Development of maintenance tools based on tribology for nuclear power plant

    International Nuclear Information System (INIS)

    Iwai, Yoshiro; Honda, Tomomi; Yoshinaga, Shigeki

    2007-01-01

    Many tribological problems occur in the maintenance of nuclear power plants. In this paper, we introduced our developed maintenance tools based on tribology such as a particle counter and wear sensors. Their principals were shown briefly and their usefulness was clarified by the experiments on monitoring of wear. (author)

  9. Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization

    International Nuclear Information System (INIS)

    Sanchez, Ana; Carlos, Sofia; Martorell, Sebastian; Villanueva, Jose F.

    2009-01-01

    Optimization of testing and maintenance activities performed in the different systems of a complex industrial plant is of great interest as the plant availability and economy strongly depend on the maintenance activities planned. Traditionally, two types of models, i.e. deterministic and probabilistic, have been considered to simulate the impact of testing and maintenance activities on equipment unavailability and the cost involved. Both models present uncertainties that are often categorized as either aleatory or epistemic uncertainties. The second group applies when there is limited knowledge on the proper model to represent a problem, and/or the values associated to the model parameters, so the results of the calculation performed with them incorporate uncertainty. This paper addresses the problem of testing and maintenance optimization based on unavailability and cost criteria and considering epistemic uncertainty in the imperfect maintenance modelling. It is framed as a multiple criteria decision making problem where unavailability and cost act as uncertain and conflicting decision criteria. A tolerance interval based approach is used to address uncertainty with regard to effectiveness parameter and imperfect maintenance model embedded within a multiple-objective genetic algorithm. A case of application for a stand-by safety related system of a nuclear power plant is presented. The results obtained in this application show the importance of considering uncertainties in the modelling of imperfect maintenance, as the optimal solutions found are associated with a large uncertainty that influences the final decision making depending on, for example, if the decision maker is risk averse or risk neutral

  10. Addressing imperfect maintenance modelling uncertainty in unavailability and cost based optimization

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez, Ana [Department of Statistics and Operational Research, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain); Carlos, Sofia [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain); Martorell, Sebastian [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain)], E-mail: smartore@iqn.upv.es; Villanueva, Jose F. [Department of Chemical and Nuclear Engineering, Polytechnic University of Valencia, Camino de Vera, s/n, 46071 Valencia (Spain)

    2009-01-15

    Optimization of testing and maintenance activities performed in the different systems of a complex industrial plant is of great interest as the plant availability and economy strongly depend on the maintenance activities planned. Traditionally, two types of models, i.e. deterministic and probabilistic, have been considered to simulate the impact of testing and maintenance activities on equipment unavailability and the cost involved. Both models present uncertainties that are often categorized as either aleatory or epistemic uncertainties. The second group applies when there is limited knowledge on the proper model to represent a problem, and/or the values associated to the model parameters, so the results of the calculation performed with them incorporate uncertainty. This paper addresses the problem of testing and maintenance optimization based on unavailability and cost criteria and considering epistemic uncertainty in the imperfect maintenance modelling. It is framed as a multiple criteria decision making problem where unavailability and cost act as uncertain and conflicting decision criteria. A tolerance interval based approach is used to address uncertainty with regard to effectiveness parameter and imperfect maintenance model embedded within a multiple-objective genetic algorithm. A case of application for a stand-by safety related system of a nuclear power plant is presented. The results obtained in this application show the importance of considering uncertainties in the modelling of imperfect maintenance, as the optimal solutions found are associated with a large uncertainty that influences the final decision making depending on, for example, if the decision maker is risk averse or risk neutral.

  11. An Abstraction Hierarchy based mobile PC display design in NPP maintenance considering the level of expertise

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Seong, Poong Hyun

    2011-01-01

    Research highlights: → Six levels of Abstraction Hierarchy based information for maintenance were proposed. → Errors and workload with AH based information display were reduced for LL subjects. → Design concerns discovered can be applied to practical use of mobile maintenance aids. - Abstract: Recently, the importance of effective maintenance in nuclear power plants (NPPs) has been emphasized and research into effective maintenance by adopting mobile maintenance aids (MMAs) have been attempted. For improved and effective use of an MMA display design method based on the hierarchy is proposed and its design considerations are discussed in this study. Six levels of hierarchy are proposed in this paper to classify the maintenance information. By classifying and organizing maintenance information using the hierarchy, maintenance information can be used effectively by users with either high or low levels of expertise. When information classification has been finished, the information for MMA design is selected and designed. With the considerations of MMA design analysis and guidelines, a hierarchy-based MMA is designed for the maintenance tasks. An experiment is conducted using the hierarchy-based MMA in order to estimate the effectiveness of the proposed method for the maintenance tasks and to identify design considerations to enhance the proposed MMAs. The result indicated that a hierarchy-based manual was more effective than a conventional manual in terms of task completion time and number of errors. The workload for the hierarchy-based manual was estimated less than the conventional manual for subjects with low level of expertise. As the level of expertise increases, subjects tended to follow more abstract information while the number of navigations decreased. It is believed that when mobile devices become pervasive in NPP maintenance fields, the hierarchy model applied MMAs can be used as an effective maintenance supporting tool.

  12. Methadone maintenance therapy as evidence based drug abuse ...

    African Journals Online (AJOL)

    Methadone maintenance therapy as evidence based drug abuse planning in ... drugs are being used as artificial problem-solvers such as frustrations, stress or ... Drug use is a problem to users when it begins to cause some damage to their ...

  13. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  14. A condition-based maintenance policy for multi-component systems with a high maintenance setup cost

    NARCIS (Netherlands)

    Zhu, Q.; Peng, H.; Houtum, van G.J.J.A.N.

    2012-01-01

    Condition-based maintenance (CBM) is becoming increasingly important due to the development of advanced sensor and ICT technology, so that the condition data can be collected remotely. We propose a new CBM policy for multi-component systems with continuous stochastic deteriorations. To reduce the

  15. Risk-Based Maintenance Assessment in the Manufacturing Industry: Minimisation of Suboptimal Prioritisation

    Directory of Open Access Journals (Sweden)

    Ratnayake R.M. Chandima

    2017-03-01

    Full Text Available Manufacturing firms continuously strive to increase the efficiency and effectiveness in the maintenance management processes. Focus is placed on eliminating the unexpected failures which cause unnecessary costs and the production losses. Risk-based maintenance (RBM strategies enable to address the above through the identification of probability and consequences of potential failures whilst providing a way for prioritisation of maintenance actions based on the risk of possible failures. Such prioritisations enable to identify the optimal maintenance strategy, intervals of maintenance tasks, and optimal level of spare parts inventory. However, the risk assessment activities are performed with the support of a risk matrix. Suboptimal classifications and/or prioritisations arise due to the inherent nature of the risk matrix. This is caused by the fact that there are no means to incorporate actual circumstances at the boundary of the input ranges or at the levels of linguistic data and risk categories. In this paper, a risk matrix is first developed in collaboration with one of the manufacturing firms in Poland. Then, it illustrates the use of fuzzy logic for minimisation of suboptimal prioritisation and/or classifications using a fuzzy inference system (FIS together with illustrative membership functions and a rule base. Finally, an illustrative risk assessment is also demonstrated to illustrate the methodology.

  16. Prioritization of pavement maintenance sections using objective based Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Sarfaraz Ahmed

    2017-03-01

    Full Text Available The application of Analytic Hierarchy Process (AHP method for the prioritization of pavement maintenance sections is widespread now-a-days. Although the evaluation of pavement maintenance section through AHP method is simple, where the relative importance (on Saaty’s scale assigned to each parameter in the hierarchy varies between the experts (transportation professionals consulted, which leads to discrepancies in the final rankings of the sections’, due to the subjectivity in the process. Further, experts base their decisions solely on their experience while consideration is not given to the actual quantitative physical condition of the roads. To overcome these difficulties an objective based AHP method is proposed in this study, where pairwise comparison values are assigned based on the collected field data from a road network in Mumbai city, consisting of 28 road sections. The final ranking list of candidate sections takes into consideration the priority weight of alternatives, which reflect the road conditions. The solution of priority ratings of AHP method is compared with the corresponding solution of road condition index method, a traditional pavement maintenance procedure. The findings of the present study suggest that objective based AHP method is more suitable for the prioritization of pavement maintenance of roads. Keywords: Prioritization, Analytic Hierarchy Process, Road condition index, Objective method, Rating and ranking

  17. Analysis of the possibility of applying a condition-based maintenance model on an example of tank weapons

    Directory of Open Access Journals (Sweden)

    Igor J. Epler

    2013-12-01

    Full Text Available For any modern army it is very important to continuously maintain a high degree of operational (combat readiness (availability in order to maximize the effectiveness of the use of technical systems. Since determination and prediction of technical states and failures of technical systems in engineering, especially in armament, are difficult due to the impossibility of continuous condition monitoring with appropriate measuring equipment there is a need for a maintenance model that would be most helpful in taking timely action maintenance. In this paper, the subject of research is a model of maintenance of the M-84 tank  weapoons systems.   IntroductionThe M-84 tank is one of the most promising technical systems in the Serbian Army. Its use and modifications are foreseen in the next ten years. The  M-84 is characterized by good tactical and technical characteristics. It has a powerful 125 mm cannon, coupled 7.62 mm machine gun and 12.7 mm anti-aircraft machine gun. The M-84 tank has an automatic battery charger and a fire control system. The fire control system enables fast target tracking and stabilization of the cannon barrel, which is a prerequisite for timely and favorable effect on the target. There are certain ambiguities in the existing model of maintenance of tank weapons.   Technical diagnostics Technical diagnostics, as a part of the process of condition-based maintenance, should determine technical conditions of components or technical systems with certain accuracy at a point in time.   Maintenance strategy A maintenance strategy can be defined as a variant of a maintenance system determined by a concept, organization and character of maintenance procedures, as well as the relationship between the various levels at which maintenance is performed. It is defined for technical system parts, individual technical systems and for system maintenance as a whole. The basic maintenance strategies implemented today are: -      corrective

  18. Influência do ângulo de incidência nos ganhos de calor solar através de materiais transparentes

    Directory of Open Access Journals (Sweden)

    Joaquim Pizzutti dos Santos

    Full Text Available Este trabalho apresenta uma equação genérica que relaciona a variação do Fator Solar com o ângulo de incidência. As curvas resultantes desta variação, para vidros e outros materiais transparentes, foram obtidas a partir de experimentos de espectrofotometria para reflexão e transmissão, realizados para diferentes ângulos de incidência. Desta forma, foram identificados grupos de materiais com comportamento semelhante de variação do Fator Solar em função do ângulo. Para cada um dos grupos foi definido um material de referência, com valores de Fator Solar representando o comportamento médio do grupo. Para estes materiais foram obtidas equações gerais da curva de variação do Fator Solar, que permite calcular o ganho de calor solar total considerando a variação do ângulo de incidência da radiação ao longo de um período de tempo. O valor desses ganhos para qualquer material do mesmo grupo pode ser obtido aplicando um coeficiente de correção, que é o valor do Fator Solar para a incidência normal do material considerado. Os valores para esse coeficiente são propostos neste trabalho para um grande número de materiais ou podem ser obtidos a partir de catálogos.

  19. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  20. Preventive Maintenance Interval Prediction: a Spare Parts Inventory Cost and Lost Earning Based Model

    Directory of Open Access Journals (Sweden)

    O. A. Adebimpe

    2015-06-01

    Full Text Available In this paper, some preventive maintenance parameters in manufacturing firms were identified and used to develop cost based functions in terms of machine preventive maintenance. The proposed cost based model considers system’s reliability, cost of keeping spare parts inventory and lost earnings in deriving optimal maintenance interval. A case of a manufacturing firm in Nigeria was observed and the data was used to evaluate the model.

  1. Laser-Based Maintenance and Repair Technologies for Reactor Components

    International Nuclear Information System (INIS)

    Masaki Yoda; Naruhiko Mukai; Makoto Ochiai; Masataka Tamura; Satoshi Okada; Katsuhiko Sato; Motohiko Kimura; Yuji Sano; Noboru Saito; Seishi Shima; Tetsuo Yamamoto

    2004-01-01

    Toshiba has developed various laser-based maintenance and repair technologies and applied them to existing nuclear power plants. Laser-based technology is considered to be the best tool for remote processing in nuclear power plants, and particularly so for the maintenance and repair of reactor core components. Accessibility could be drastically improved by a simple handling system owing to the absence of reactive force against laser irradiation and the flexible optical fiber. For the preventive maintenance, laser peening (LP) technology was developed and applied to reactor components in operating BWR plants. LP is a novel process to improve residual stress from tensile to compressive on material surface layer by irradiating focused high-power laser pulses in water. We have developed a fiber-delivered LP system as a preventive maintenance measure against stress corrosion cracking (SCC). Laser ultrasonic testing (LUT) has a great potential to be applied to the remote inspection of reactor components. Laser-induced surface acoustic wave (SAW) inspection system was developed using a compact probe with a multi-mode optical fiber and an interferometer. The developed system successfully detected a micro slit of 0.5 mm depth on weld metal and heat-affected zone (HAZ). An artificial SCC was also detected by the system. We are developing a new LP system combined with LUT to treat the inner surface of bottom-mounted instruments (BMI) of PWR plants. Underwater laser seal welding (LSW) technology was also developed to apply surface crack. LSW is expected to isolate the crack tip from corrosive water environment and to stop the propagation of the crack. Rapid heating and cooling of the process minimize the heat effect, which extends the applicability to neutron-irradiated material. This paper describes recent advances in the development and application of such laser-based technologies. (authors)

  2. Risk-Based Operation and Maintenance Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    This paper describes how risk-based decision making can be used for maintenance planning of components exposed to degradation such as fatigue in offshore wind turbines. In fatigue models, large epistemic uncertainties are usually present. These can be reduced if monitoring results are used to upd...

  3. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...... monitoring, fault prediction and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution...

  4. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud; Sørensen, John Dalsgaard

    2018-01-01

    monitoring, fault prediction and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution......The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...

  5. Bayesian based Prognostic Model for Predictive Maintenance of Offshore Wind Farms

    DEFF Research Database (Denmark)

    Asgarpour, Masoud

    2017-01-01

    monitoring, fault detection and predictive maintenance of offshore wind components is defined. The diagnostic model defined in this paper is based on degradation, remaining useful lifetime and hybrid inspection threshold models. The defined degradation model is based on an exponential distribution......The operation and maintenance costs of offshore wind farms can be significantly reduced if existing corrective actions are performed as efficient as possible and if future corrective actions are avoided by performing sufficient preventive actions. In this paper a prognostic model for degradation...

  6. Descartes de origem animal e o crescimento e ganho de peso do jacaré-de-papo-amarelo, Caiman latirostris (Daudin, 1802, em cativeiro

    Directory of Open Access Journals (Sweden)

    Sarkis-Gonçalves Fabianna

    2002-01-01

    Full Text Available O custo da alimentação é o principal fator limitante para a criação de jacarés em cativeiro. O uso de descartes e subprodutos como fontes de alimento em fazendas de criação de jacarés poderá auxiliar a resolver este problema. No presente estudo, quatro diferentes tipos de descartes provenientes da produção animal foram avaliados como alimento para o jacaré-de-papo-amarelo (Caiman latirostris durante o primeiro ano de vida. Um total de 120 filhotes provenientes de seis ninhadas foram mantidos em quatro diferentes tanques dentro de uma estufa plástica. As seguintes dietas foram usadas: peixe, suino, frango e mista (peixe + suino + frango em iguais proporções. O delineamento experimental foi de ANOVA por blocos. Ganho de peso e taxas de crescimento do comprimento rostro-anal e da cintura comercial foram medidos e modelos de crescimento foram estabelecidos. A dieta mista resultou em melhores taxas de crescimento e ganho de peso, mas não foram detectadas diferenças consistentes entre as dietas usadas quanto aos modelos de crescimento.

  7. The role of knowledge sharing and transactive memory system on condition based maintenance policy

    NARCIS (Netherlands)

    Koochaki, J.; Bouwhuis, I. M.

    2008-01-01

    Today, Condition Based Maintenance (CBM) has reached a sophisticated level in industry and the advantages of predictive maintenance are accepted globally. However, although lots of effort has been put into improving methods and techniques in CBM, most of predictive maintenance programs fail to

  8. Remediation of Gremikha Coastal maintenance base - status of the project

    International Nuclear Information System (INIS)

    Pillette-Cousin, L.; Stepennov, B.S.; Gorbatchev, A.

    2008-01-01

    The former coastal maintenance base in Gremikha is located in the Kola Peninsula, along the Barents Sea, about 300 km east from Murmansk. There is no road or railway to get there, therefore the only possible connection is either by sea or by helicopter. Remediation of the Gremikha coastal maintenance base (CMB) is now one of the main priorities for Rosatom (the Agency for Atomic Energy of the Russian Federation) because nuclear and radioactive waste are currently stored in conditions which do not meet the up-to-date safety and regulatory requirements and it might represent an environmental hazard and a risk of misappropriation of the nuclear material stored there. (authors)

  9. A preventive maintenance policy based on dependent two-stage deterioration and external shocks

    International Nuclear Information System (INIS)

    Yang, Li; Ma, Xiaobing; Peng, Rui; Zhai, Qingqing; Zhao, Yu

    2017-01-01

    This paper proposes a preventive maintenance policy for a single-unit system whose failure has two competing and dependent causes, i.e., internal deterioration and sudden shocks. The internal failure process is divided into two stages, i.e. normal and defective. Shocks arrive according to a non-homogeneous Poisson process (NHPP), leading to the failure of the system immediately. The occurrence rate of a shock is affected by the state of the system. Both an age-based replacement and finite number of periodic inspections are schemed simultaneously to deal with the competing failures. The objective of this study is to determine the optimal preventive replacement interval, inspection interval and number of inspections such that the expected cost per unit time is minimized. A case study on oil pipeline maintenance is presented to illustrate the maintenance policy. - Highlights: • A maintenance model based on two-stage deterioration and sudden shocks is developed. • The impact of internal system state on external shock process is studied. • A new preventive maintenance strategy combining age-based replacements and periodic inspections is proposed. • Postponed replacement of a defective system is provided by restricting the number of inspections.

  10. A condition-based maintenance policy for multi-component systems with Lévy copulas dependence

    International Nuclear Information System (INIS)

    Li, Heping; Deloux, Estelle; Dieulle, Laurence

    2016-01-01

    In this paper, we propose a new condition-based maintenance policy for multi-component systems taking into account stochastic and economic dependences. The stochastic dependence between components due to common environment is modelled by Lévy copulas. Its influence on the maintenance optimization is investigated with different dependence degrees. On the issue of economic dependence providing opportunities to group maintenance activities, a new maintenance decision rule is proposed which permits maintenance grouping. In order to evaluate the performance of the proposed maintenance policy, we compare it to the classical maintenance policies. - Highlights: • A new adaptive maintenance policy for grouping maintenance actions is proposed. • The impacts of both economic and stochastic dependences are investigated. • The performance of the proposed maintenance policy is evaluated under different system configurations. • The stochastic dependence is modelled by Lévy copulas. • The proposed maintenance decision rule can take full advantage of economic and stochastic dependences.

  11. Performance based regulation - The maintenance rule

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Richard P. [NRR/DOTS/TQMP, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, M/S OWFN 10A19, Washington, D.C. 20555 (United States)

    1997-07-01

    The U.S. Nuclear Regulatory Commission has begun a transition from 'process-oriented' to 'results-oriented' regulations. The maintenance rule is a results-oriented rule that mandates consideration of risk and plant performance. The Maintenance Rule allows licensees to devise the most effective and efficient means of achieving the results described in the rule including the use of Probabilistic Risk (or Safety) Assessments. The NRC staff conducted a series of site visits to evaluate implementation of the Rule. Conclusions from the site visits indicated that the results-oriented Maintenance Rule can be successfully implemented and enforced. (author)

  12. Performance based regulation - The maintenance rule

    International Nuclear Information System (INIS)

    Correia, Richard P.

    1997-01-01

    The U.S. Nuclear Regulatory Commission has begun a transition from 'process-oriented' to 'results-oriented' regulations. The maintenance rule is a results-oriented rule that mandates consideration of risk and plant performance. The Maintenance Rule allows licensees to devise the most effective and efficient means of achieving the results described in the rule including the use of Probabilistic Risk (or Safety) Assessments. The NRC staff conducted a series of site visits to evaluate implementation of the Rule. Conclusions from the site visits indicated that the results-oriented Maintenance Rule can be successfully implemented and enforced. (author)

  13. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    Science.gov (United States)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  14. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    International Nuclear Information System (INIS)

    Milana; Khan, M K; Munive, J E

    2014-01-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective

  15. Corrosion Sensor Development for Condition-Based Maintenance of Aircraft

    Directory of Open Access Journals (Sweden)

    Gino Rinaldi

    2012-01-01

    Full Text Available Aircraft routinely operate in atmospheric environments that, over time, will impact their structural integrity. Material protection and selection schemes notwithstanding, recurrent exposure to chlorides, pollution, temperature gradients, and moisture provide the necessary electrochemical conditions for the development and profusion of corrosion in aircraft structures. For aircraft operators, this becomes an important safety matter as corrosion found in a given aircraft must be assumed to be present in all of that type of aircraft. This safety protocol and its associated unscheduled maintenance requirement drive up the operational costs of the fleet and limit the availability of the aircraft. Hence, there is an opportunity at present for developing novel sensing technologies and schemes to aid in shifting time-based maintenance schedules towards condition-based maintenance procedures. In this work, part of the ongoing development of a multiparameter integrated corrosion sensor is presented. It consists of carbon nanotube/polyaniline polymer sensors and commercial-off-the-shelf sensors. It is being developed primarily for monitoring environmental and material factors for the purpose of providing a means to more accurately assess the structural integrity of aerospace aluminium alloys through fusion of multiparameter sensor data. Preliminary experimental test results are presented for chloride ion concentration, hydrogen gas evolution, humidity variations, and material degradation.

  16. Maintenance management of railway infrastructures based on reliability analysis

    International Nuclear Information System (INIS)

    Macchi, Marco; Garetti, Marco; Centrone, Domenico; Fumagalli, Luca; Piero Pavirani, Gian

    2012-01-01

    Railway infrastructure maintenance plays a crucial role for rail transport. It aims at guaranteeing safety of operations and availability of railway tracks and related equipment for traffic regulation. Moreover, it is one major cost for rail transport operations. Thus, the increased competition in traffic market is asking for maintenance improvement, aiming at the reduction of maintenance expenditures while keeping the safety of operations. This issue is addressed by the methodology presented in the paper. The first step of the methodology consists of a family-based approach for the equipment reliability analysis; its purpose is the identification of families of railway items which can be given the same reliability targets. The second step builds the reliability model of the railway system for identifying the most critical items, given a required service level for the transportation system. The two methods have been implemented and tested in practical case studies, in the context of Rete Ferroviaria Italiana, the Italian public limited company for railway transportation.

  17. 14 CFR 119.47 - Maintaining a principal base of operations, main operations base, and main maintenance base...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintaining a principal base of operations, main operations base, and main maintenance base; change of address. 119.47 Section 119.47 Aeronautics... Under Part 121 or Part 135 of This Chapter § 119.47 Maintaining a principal base of operations, main...

  18. Optimizing Maintenance of Constraint-Based Database Caches

    Science.gov (United States)

    Klein, Joachim; Braun, Susanne

    Caching data reduces user-perceived latency and often enhances availability in case of server crashes or network failures. DB caching aims at local processing of declarative queries in a DBMS-managed cache close to the application. Query evaluation must produce the same results as if done at the remote database backend, which implies that all data records needed to process such a query must be present and controlled by the cache, i. e., to achieve “predicate-specific” loading and unloading of such record sets. Hence, cache maintenance must be based on cache constraints such that “predicate completeness” of the caching units currently present can be guaranteed at any point in time. We explore how cache groups can be maintained to provide the data currently needed. Moreover, we design and optimize loading and unloading algorithms for sets of records keeping the caching units complete, before we empirically identify the costs involved in cache maintenance.

  19. PRM-based patterns for knowledge formalisation of industrial systems to support maintenance strategies assessment

    International Nuclear Information System (INIS)

    Medina-Oliva, G.; Weber, P.; Iung, B.

    2013-01-01

    The production system and its maintenance system must be now developed on “system thinking” paradigm in order to guarantee that Key Performance Indicators (KPI) will be optimized all along the production system (operation) life. In a recursive way, maintenance system engineering has to integrate also KPI considerations with regards to its own enabling systems. Thus this paper develops a system-based methodology wherein a set of KPIs is computed in order to verify if the objectives of the production and maintenance systems are satisfied. In order to help the decision-making process for maintenance managers, a “unified” generic model have been developed. This model integrates (a) the interactions of the maintenance system with its enabling systems, (b) the impact of the maintenance strategies through the computation of some key performance indicators, and (c) different kinds of knowledge regarding the maintenance system and the system of interest, including quantitative and qualitative knowledge. This methodology is based on an executable unified model built with Probabilistic Relational Model (PRM). PRM allows a modular representation and inferences computation of large size models. The methodology added-value is shown on a test-bench

  20. Joint optimization of condition-based maintenance and production lot-sizing

    NARCIS (Netherlands)

    Peng, H.; van Houtum, G.J.J.A.N.

    2016-01-01

    Due to the development of sensor technologies nowadays, condition-based maintenance (CBM) programs can be established and optimized based on the data collected through condition monitoring. The CBM activities can significantly increase the uptime of a machine. However, they should be conducted in a

  1. Managing wind turbine reliability and maintenance via performance-based contract

    DEFF Research Database (Denmark)

    Jin, Tongdan; Ding, Yi; Guo, Huairui

    2012-01-01

    between system cost, reliability and spare parts stocking. This analytical insight into the system performance allows the turbine manufacturer to optimize design, production, and after-sales services. The study aims to create a theoretical basis to facilitate the transition of the maintenance paradigm......Performance-based contracting (PBC) is reshaping the acquisition, operation, and maintenance of capital equipment. Under the PBC scheme, we propose a holistic approach for lowering the cost of wind turbine ownership while meeting the availability requirement. Our effects are focused on integrated...... firms who design and market wind turbines, and also provide maintenance and repair service. PBC differs from conventional service contracts in that the wind farmers compensate the service provider for the system performance, not the spare parts and repair labor. We explore the analytical relationship...

  2. Analyzing maintenance strategies by agent-based simulations: A feasibility study

    International Nuclear Information System (INIS)

    Kaegi, M.; Mock, R.; Kroeger, W.

    2009-01-01

    Thoroughly planned and implemented maintenance strategies save time and cost. However, the integration of maintenance work into reliability analysis is difficult as common modeling techniques are often not applicable due to state explosion which calls for restrictive model assumptions and oversimplification. From authors' point of view, agent-based modeling (ABM) of technical and organizational systems is a promising approach to overcome such problems. But since ABM is not well established in reliability analysis its feasibility in this area still has to be demonstrated. For this purpose ABM is compared with Markov chains, namely by analyzing the reliability of a maintained n-unit system with dependent repair events, applying both modeling approaches. Although ABM and Markov chains lead to the same numerical results, the former points out the potentiality of an improved system state handling. This is demonstrated by extending the ABM with operators as additional 'agents' featuring their location (x;y) availability (0;1) and different maintenance strategies. This extension highlights the capability of ABM to analyze complex emergent system behavior and allows a systematic refinement and optimization of the maintenance strategies.

  3. Risk Based Maintenance of Offshore Wind Turbines Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    This paper presents how Bayesian networks can be used to make optimal decisions for repairs of offshore wind turbines. The Bayesian network is an efficient tool for updating a deterioration model whenever new information becomes available from inspections/monitoring. The optimal decision is found...... such that the preventive maintenance effort is balanced against the costs to corrective maintenance including indirect costs to reduced production. The basis for the optimization is the risk based Bayesian decision theory. The method is demonstrated through an application example....

  4. Desempenho agronômico e ganho genético pela seleção de pinhão-manso em três regiões do Brasil

    Directory of Open Access Journals (Sweden)

    Bruno Galvêas Laviola

    2014-05-01

    Full Text Available O objetivo deste trabalho foi avaliar o desempenho agronômico e o ganho genético pela seleção de famílias de meio-irmãos de pinhão-manso, cultivado em três regiões do Brasil. A partir de seleção fenotípica prévia, foram instalados três testes de progênies, em 2008, nos municípios de Planaltina, DF, Nova Porteirinha, MG, e Pelotas, RS. Utilizou-se o delineamento de blocos ao acaso, com três repetições e cinco plantas por parcela. Como testemunha, foram utilizadas sementes, colhidas ao acaso, de uma população sem seleção. Houve interação significativa entre os efeitos de genótipos por ambientes. As estimativas dos componentes de variância e dos parâmetros genéticos indicaram que é possível obter ganhos com a seleção das melhores famílias, nos ambientes avaliados. Em cada ambiente, ao menos uma família foi selecionada com desempenho superior ao tratamento-controle. O ganho genético médio, obtido pela seleção massal nos três ambientes, foi de 72%. Observou-se alto coeficiente de correlação entre os ambientes de Planaltina e Nova Porteirinha, quanto ao desempenho agronômico, o que não se repetiu no Município de Pelotas. A interação genótipo x ambiente deve ser considerada na recomendação de materiais genéticos de pinhão-manso para ambientes distintos.

  5. A Novel Short-Term Maintenance Strategy for Power Transmission and Transformation Equipment Based on Risk-Cost-Analysis

    Directory of Open Access Journals (Sweden)

    Hang Yang

    2017-11-01

    Full Text Available Current studies on preventive condition-based maintenance of power transmission and transformation equipment mainly focus on mid-term or long-term maintenance, and cannot meet the requirements of short-term especially temporary maintenance. In order to solve the defects of the present preventive maintenance strategies, according to the engineering application and based on risk-cost analysis, a short-term maintenance strategy is proposed in this manuscript. For the equipment working in bad health condition, its active maintenance costs and operation risk costs are evaluated, respectively. Then the latest maintenance time is calculated in accordance with the principle that its operation risk costs are no higher than active maintenance costs. Utilizing the latest maintenance time, the best maintenance time is calculated by setting the maximum relative earnings of postponing maintenance as the target, which provides the operation staffs with comprehensive maintenance-decision support. In the end, different cases on the IEEE 24-bus system are simulated. The effectiveness and advantages of the proposed strategy are demonstrated by the simulation results.

  6. The Issues of Track Maintenance Management in Indonesia (Based on Study of the British Railways

    Directory of Open Access Journals (Sweden)

    Tetria Yunik Dewi Pamungkas

    2017-01-01

    Full Text Available It is believed that there is merit in researching how the management of track maintenance is organized in the United Kingdom, in particular by Network Rail, and then evaluating how this can be applied to the benefit of Indonesian Railways. The purpose of this research was expected to provide recommendations for management improvement of track maintenance by researching the track maintenance management system in Network Rail. This research study is based on secondary data. The analysis was conducted by using comparison method which compares the British Railways management and Indonesia railway management related to track maintenance management. The track maintenance management system was studied by using Network Rail. The results were compared with track maintenance management system in Indonesia. The comparison will provide the data differences that evaluated so the problem can be identified. The final result of this analysis was the identification of problems and improvisation that can be done for the development of track maintenance management in Indonesia. Several management issues have been mapped to several groups: finance management, structure organization, and asset management. From the problems that have been mapped, some improvements are recommended as monopolist authority restriction, maintenance system contract extension, re-structuring organization hierarchy, business plan consideration, track monitoring strategy arrangement, and condition based maintenance strategy adoption.

  7. Structural health monitoring methodology for aircraft condition-based maintenance

    Science.gov (United States)

    Saniger, Jordi; Reithler, Livier; Guedra-Degeorges, Didier; Takeda, Nobuo; Dupuis, Jean Pierre

    2001-06-01

    Reducing maintenance costs while keeping a constant level of safety is a major issue for Air Forces and airlines. The long term perspective is to implement condition based maintenance to guarantee a constant safety level while decreasing maintenance costs. On this purpose, the development of a generalized Structural Health Monitoring System (SHMS) is needed. The objective of such a system is to localize the damages and to assess their severity, with enough accuracy to allow low cost corrective actions. The present paper describes a SHMS based on acoustic emission technology. This choice was driven by its reliability and wide use in the aerospace industry. The described SHMS uses a new learning methodology which relies on the generation of artificial acoustic emission events on the structure and an acoustic emission sensor network. The calibrated acoustic emission events picked up by the sensors constitute the knowledge set that the system relies on. With this methodology, the anisotropy of composite structures is taken into account, thus avoiding the major cause of errors of classical localization methods. Moreover, it is adaptive to different structures as it does not rely on any particular model but on measured data. The acquired data is processed and the event's location and corrected amplitude are computed. The methodology has been demonstrated and experimental tests on elementary samples presented a degree of accuracy of 1cm.

  8. Bayesian Based Diagnostic Model for Condition Based Maintenance of Offshore Wind Farms

    Directory of Open Access Journals (Sweden)

    Masoud Asgarpour

    2018-01-01

    Full Text Available Operation and maintenance costs are a major contributor to the Levelized Cost of Energy for electricity produced by offshore wind and can be significantly reduced if existing corrective actions are performed as efficiently as possible and if future corrective actions are avoided by performing sufficient preventive actions. This paper presents an applied and generic diagnostic model for fault detection and condition based maintenance of offshore wind components. The diagnostic model is based on two probabilistic matrices; first, a confidence matrix, representing the probability of detection using each fault detection method, and second, a diagnosis matrix, representing the individual outcome of each fault detection method. Once the confidence and diagnosis matrices of a component are defined, the individual diagnoses of each fault detection method are combined into a final verdict on the fault state of that component. Furthermore, this paper introduces a Bayesian updating model based on observations collected by inspections to decrease the uncertainty of initial confidence matrix. The framework and implementation of the presented diagnostic model are further explained within a case study for a wind turbine component based on vibration, temperature, and oil particle fault detection methods. The last part of the paper will have a discussion of the case study results and present conclusions.

  9. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  10. Concept design of CFETR superconducting magnet system based on different maintenance ports

    International Nuclear Information System (INIS)

    Zheng, Jinxing; Liu, Xufeng; Song, Yuntao; Wan, Yuanxi; Li, Jiangang; Wu, Sontao; Wan, Baonian; Ye, Minyou; Wei, Jianghua; Xu, Weiwei; Liu, Sumei; Weng, Peide; Lu, Kun; Luo, Zhengping

    2013-01-01

    Highlights: • This article discussed the concept design of the magnet system of CFETR based on different maintenance port cases. • The major and minor radius of plasma is 5.7 m and 1.6 m, and the central magnetic field was designed as 4.5/5.0 T. • The different maintenance ports design have little impact on the design of TF and CS coils’ design, but have certain impact on the PF coils’ design. -- Abstract: CFETR which stands for “China Fusion Engineering Test Reactor” is a new tokamak device. Its magnet system includes the Toroidal Field (TF) winding, Center solenoid winding (CS) and Poloidal Field (PF) winding. The main goal of the project is to build a fusion engineering Tokamak reactor with its fusion power is 50–200 MW and should be self-sufficiency by blanket. In order to ensure the maintenance ports design and maintenance method, this article discussed the concept design of the magnet system based on different maintenance port cases. The paper detailed studied the magnet system of CFETR including the electromagnetic analysis and parameters for TF (CS)PF. Besides, the volt-seconds of ohmic field are presented as detailed as possible in this paper. In addition, the calculations and optimizations of equilibrium field which should guarantee the plasma discharge of single null shape is carried out. The design work reported here illustrates that the present maintenance ports will not have a great impact on the design of the magnet system. The concept design of the magnet system can meet the requirement of the physical target

  11. An overview of the recent advances in delay-time-based maintenance modelling

    International Nuclear Information System (INIS)

    Wang, Wenbin

    2012-01-01

    Industrial plant maintenance is an area which has enormous potential to be improved. It is also an area attracted significant attention from mathematical modellers because of the random phenomenon of plant failures. This paper reviews the recent advances in delay-time-based maintenance modelling, which is one of the mathematical techniques for optimising inspection planning and related problems. The delay-time is a concept that divides a plant failure process into two stages: from new until the point of an identifiable defect, and then from this point to failure. The first stage is called the normal working stage and the second stage is called the failure delay-time stage. If the distributions of the two stages can be quantified, the relationship between the number of failures and the inspection interval can be readily established. This can then be used for optimizing the inspection interval and other related decision variables. In this review, we pay particular attention to new methodological developments and industrial applications of the delay-time-based models over the last few decades. The use of the delay-time concept and modeling techniques in other areas rather than in maintenance is also reviewed. Future research directions are also highlighted. - Highlights: ► Reviewed the recent advances in delay-time-based maintenance models and applications. ► Compared the delay-time-based models with other models. ► Focused on methodologies and applications. ► Pointed out future research directions.

  12. Risk-based and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, K.; Nagai, S.; Akikuni, Y.; Fujiwara, T.; Furuya, K.; Matsumoto, S.; Takagi, K.; Kawabata, T.

    2003-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants. (orig.)

  13. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  14. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  15. A evolução da qualidade e sua contribuição para o ganho de vantagem competitiva das empresas

    OpenAIRE

    Jose Ivan Alvares Xavier Ferreira

    1995-01-01

    Resumo: Trata-se do estudo da Qualidade focalizando os aspectos relacionados com o ganho de vantagem competitiva das empresas, causado pelo movimento da Qualidade. É discutida a evolução da Qualidade, desde suas raízes até os dias atuais, e mostrado os elementos que ela incorporou das fases que a precedeu, contribuindo para a competitividade das empresas. É abordado um modelo de implementação do Gerenciamento da Qualidade Total e discutido os seus benefícios. É discutido como a tecnologia ava...

  16. Velocidade de ganho de peso nos primeiros anos de vida e excesso de peso entre 5-11 anos de idade, Salvador, Bahia, Brasil Weight gain rate in early childhood and overweight in children 5-11 years old in Salvador, Bahia State, Brazil

    Directory of Open Access Journals (Sweden)

    Sheila Maria Alvim de Matos

    2011-04-01

    Full Text Available Crianças com sobrepeso estão mais propensas a se tornarem adultos com sobrepeso ou obesos, sendo a prevenção mais eficaz a intervenção em fases precoces da vida. Analisou-se a associação entre ganho de peso nos primeiros anos de vida e sobrepeso/obesidade em 1.056 crianças menores de 11 anos de idade. Foram coletadas informações relacionadas ao estilo de vida, saneamento, condições socioeconômicas, peso ao nascer e aleitamento materno. O ganho de peso do nascimento até diferentes intervalos (até 12 meses, > 12 a 18, > 18 a 24, e > 24 a 60 meses foi considerado de forma contínua em escores-z. Foi considerado excesso de peso o índice de massa corporal (IMC maior ou igual a +1 escore-z, usando referências da Organização Mundial da Saúde (OMS de 2006 e 2007. Adotou-se a regressão linear e Poisson multivariada. A velocidade do ganho ponderal mostrou-se associada ao IMC, observando-se duas vezes mais sobrepeso/obesidade a cada incremento de uma unidade no desvio-padrão da velocidade do ganho ponderal para o intervalo de 24 e 60 meses (RR = 2,08; IC95%: 1,87-2,32. Encontrou-se associação entre o rápido ganho de peso em todos os intervalos de idade e a ocorrência de sobrepeso/obesidade anos mais tarde.Overweight children are more prone to become overweight or obese adults. The most effective prevention is intervention in early childhood. We analyzed the association between early weight gain and overweight/obesity in 1,056 children under 11 years of age. Data were collected on lifestyle, sanitation, socioeconomic status, birth weight, and breastfeeding. Weight gain from birth until different age brackets ( 12 to 18, > 18 to 24, and > 24 to 60 months was considered a continuous variable in z-scores. Overweight was defined as body mass index (BMI > +1 z-score, based on 2006 and 2007 World Health Organization (WHO guidelines. Poisson regression and linear regression were used in the multivariate statistical analysis. Weight gain

  17. Uma abordagem de avaliação de processos baseados no mundo dos custos para processos no mundo dos ganhos em instituições de ensino superior Process analisys for higher education institutions: from the cost world to the throughput world

    Directory of Open Access Journals (Sweden)

    Daniel Pacheco Lacerda

    2009-12-01

    Full Text Available O presente artigo detalha o processo específico de elaboração de preços à luz dos princípios da Contabilidade de Custos para uma organização de ensino superior. O trabalho proPõe uma revisão desse processo, tendo como pano de fundo os conceitos da Teoria das Restrições, no que tange a seu Processo de Raciocínio, e as premissas de custos adotadas na chamada Contabilidade dos Ganhos. Assim, o processo de elaboração do preço é avaliado sistemicamente e um redesenho desse processo alinhado à Contabilidade dos Ganhos é proposto.This paper investigates a University's pricing process, comparing two different accounting approaches: traditional cost accounting and Theory of Constraints. Relying on concepts from the Theory of Constraints, this paper applies the principles of the Thinking Process and Throughput Accounting to review the current approach to this process. As a result, the paper evaluates the dynamics behind such processes and, based on throughput accounting, presents a new approach in tackling this.

  18. An open-source automated continuous condition-based maintenance platform for commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Katipamula, Srinivas; Gowri, Krishnan; Hernandez, George

    2016-09-09

    This paper describes one such reference process that can be deployed to provide continuous automated conditioned-based maintenance management for buildings that have BIM, a building automation system (BAS) and a computerized maintenance management software (CMMS) systems. The process can be deployed using an open source transactional network platform, VOLTTRON™, designed for distributed sensing and controls and supports both energy efficiency and grid services.

  19. Risk based maintenance to increase safety and decrease costs

    International Nuclear Information System (INIS)

    Phillips, J.H.

    2000-01-01

    Risk-Based techniques have been developed for commercial nuclear power plants for the last eight years by a team working through the ASME Center for Research and Technology Development (CRTD). System boundaries and success criteria is defined using the Probabilistic Risk Analysis or Probabilistic Safety Analysis developed to meet the Individual Plant Evaluation. Final ranking of components is by a plant expert panel similar to the one developed for the Maintenance Rule. Components are identified as being high risk-significant or low risk-significant. Maintenance and resources are focused on those components that have the highest risk-significance. The techniques have been developed and applied at a number of plants. Results from the first risk-based inspection pilot plant indicates safety due to pipe failure can be doubled while the inspection reduced to about 80% when compared with current inspection programs. Pilot studies on risk-based testing indicate that about 60% of pumps and 25 to 30% of valves in plants are high safety-significant The reduction in inspection and testing reduces the person-rem exposure and resulting in further increases in safety. These techniques have been documented in publications by the ASME CRTD which are referenced. (author)

  20. Design and evaluation of augmented reality for nuclear power plant maintenance based on Cognitive activity analysis

    International Nuclear Information System (INIS)

    Koo, Jwa Jin

    2008-02-01

    The goals of maintenance in nuclear power plants (NPPs) are to reduce the number of plant shutdowns, to decrease the shutdown time, to minimize the maintenance costs, and to improve nuclear safety. Furthermore, it is difficult for maintenance personnel to conduct work in NPPs due to the complexity of NPPs, safety issues and time constraints. Human errors should be prevented to achieve maintenance goals in NPPs. Therefore, it is necessary to improve working conditions by introducing support systems. Augmented Reality (AR) has the potential to assist with maintenance tasks and make maintenance personnel concentrate on the tasks, which will then the reduced human error and improve human performance. The working procedure for AR systems was designed based on the characteristics of cognitive activity, and an experiment was conducted to estimate the effectiveness of AR. The results indicated that a well-designed working procedure for AR systems was more effective than a conventional paper-based working procedure. In addition, participants made fewer errors using the designed working procedure. AR systems as maintenance support systems are beneficial technology that can improve maintenance performance by reducing cognitive loads and unnecessary movements. An AR application can be attractive and effective at supporting maintenance task

  1. Simulation based comparison of predictive maintenance policies

    NARCIS (Netherlands)

    Tinga, Tiedo; Janssen, R.H.P.; Steenbergen, R.; van Gelder, P.

    2013-01-01

    When an asset is operated in variable conditions, its operational efficiency can be improved significantly when the maintenance is performed in a dynamic manner. This means that variations in usage and operating environment are taken into account when deciding on the length of the maintenance

  2. The safety monitor and RCM workstation as complementary tools in risk based maintenance optimization

    International Nuclear Information System (INIS)

    Rawson, P.D.

    2000-01-01

    Reliability Centred Maintenance (RCM) represents a proven technique for rendering maintenance activities safer, more effective, and less expensive, in terms of systems unavailability and resource management. However, it is believed that RCM can be enhanced by the additional consideration of operational plant risk. This paper discusses how two computer-based tools, i.e., the RCM Workstation and the Safety Monitor, can complement each other in helping to create a living preventive maintenance strategy. (author)

  3. An Optimization Method for Condition Based Maintenance of Aircraft Fleet Considering Prognostics Uncertainty

    Directory of Open Access Journals (Sweden)

    Qiang Feng

    2014-01-01

    Full Text Available An optimization method for condition based maintenance (CBM of aircraft fleet considering prognostics uncertainty is proposed. The CBM and dispatch process of aircraft fleet is analyzed first, and the alternative strategy sets for single aircraft are given. Then, the optimization problem of fleet CBM with lower maintenance cost and dispatch risk is translated to the combinatorial optimization problem of single aircraft strategy. Remain useful life (RUL distribution of the key line replaceable Module (LRM has been transformed into the failure probability of the aircraft and the fleet health status matrix is established. And the calculation method of the costs and risks for mission based on health status matrix and maintenance matrix is given. Further, an optimization method for fleet dispatch and CBM under acceptable risk is proposed based on an improved genetic algorithm. Finally, a fleet of 10 aircrafts is studied to verify the proposed method. The results shows that it could realize optimization and control of the aircraft fleet oriented to mission success.

  4. Optimization of maintenance programme at Daya Bay Nuclear Power Station based on RCM analysis results

    International Nuclear Information System (INIS)

    Liu Min

    2003-01-01

    This paper begins with an introduction to Guangdong Daya Bay Nuclear Power Station (GNPS) and gives a simple introduction to the operations and maintenance documentation system at GNPS. It then will review the maintenance program guidelines base and the associated problems prior to the application of reliability centered maintenance (RCM). How RCM was implemented at GNPS, how the results of RCM analysis were used to optimize the maintenance program and test program, and what is the interface between RCM and the existing maintenance program will be shown. Next, it will show the successful implementation of RCM at GNPS resulted in the following changes: A new understanding of equipment failure challenges operations and maintenance beliefs, maintenance concepts undergo a large change, maintenance program and periodic testing program are continuously modified and optimized, new on-condition maintenance technologies are introduced, non-productive scheduled overhauls are discarded, maintenance costs are effectively controlled, maintenance appropriateness has improved, management of hidden failures is more effective and timely. It will show the benefit of greater equipment reliability brought about by all of these changes, which in turn increases the reliability and safety of the entire power station. (author)

  5. Single-stage Kanban system with deterioration failures and condition-based preventive maintenance

    International Nuclear Information System (INIS)

    Xanthopoulos, A.S.; Koulouriotis, D.E.; Botsaris, P.N.

    2015-01-01

    Despite the fact that the fields of pull type production control policies and condition-based preventive maintenance have much in common contextually, they have evolved independently up to now. In this investigation, an attempt is made to bridge the gap between these two branches of knowledge by introducing the single-stage Kanban system with deterioration failures and condition-based preventive maintenance. The formalism of continuous time Markov chains is used to model the system and expressions for eight performance metrics are derived. Two important, from a managerial perspective, constrained optimization problems for the proposed model are defined where the objective is the simultaneous optimization of the Kanban policy, the preventive maintenance policy and the inspection schedule under conflicting performance criteria. Multiple instances of each optimization problem are solved by means of the augmented Lagrangian genetic algorithm. The results from the optimization trials coupled by the results from extensive numerical examples facilitate the thorough investigation of the system’s behaviour. - Highlights: • Kanban system with deterioration failures and preventive maintenance is introduced. • The system is modeled as a continuous time Markov chain. • Expressions for eight performance metrics are derived. • The behavior of the system is studied through numerical examples. • Optimization results for selected performance metrics are presented

  6. Cognitive Artificial Intelligence Method for Interpreting Transformer Condition Based on Maintenance Data

    Directory of Open Access Journals (Sweden)

    Karel Octavianus Bachri

    2017-07-01

    Full Text Available A3S(Arwin-Adang-Aciek-Sembiring is a method of information fusion at a single observation and OMA3S(Observation Multi-time A3S is a method of information fusion for time-series data. This paper proposes OMA3S-based Cognitive Artificial-Intelligence method for interpreting Transformer Condition, which is calculated based on maintenance data from Indonesia National Electric Company (PLN. First, the proposed method is tested using the previously published data, and then followed by implementation on maintenance data. Maintenance data are fused to obtain part condition, and part conditions are fused to obtain transformer condition. Result shows proposed method is valid for DGA fault identification with the average accuracy of 91.1%. The proposed method not only can interpret the major fault, it can also identify the minor fault occurring along with the major fault, allowing early warning feature. Result also shows part conditions can be interpreted using information fusion on maintenance data, and the transformer condition can be interpreted using information fusion on part conditions. The future works on this research is to gather more data, to elaborate more factors to be fused, and to design a cognitive processor that can be used to implement this concept of intelligent instrumentation.

  7. Present state of condition based maintenance (CBM) and its future problem

    International Nuclear Information System (INIS)

    Hashimoto, Satoshi; Nogami, Takeki; Sugiyama, Naoki

    2008-01-01

    New inspection system of the nuclear power plant will be introduced from 2008. In this feature, eleven experts from electric utilities, venders and academia described their views or activities about Condition Based Maintenance (CBM) with a new inspection system attracting attention. These are titled as 'Electric utilities view on CBM and its technology', Deployment results of developed CBM technologies', 'Valve diagnostic analysis support system with wireless technology applied', 'Portable vibration checker', 'Tribology diagnosis with no overhaul', 'Infrared thermograph diagnosis', 'Pipewall thinning inspection and management' and, in addition, the US trend and also the development trend of the CBM advancement technology in the vender and university. CBM technology will be introduced step-by-step and contribute to establish reliability based maintenance. (T. Tanaka)

  8. Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion

    Science.gov (United States)

    2017-12-01

    Delivery T/E Table of Equipment TFSMS Total Force Structure Management System TFSP Total Force Structure Process TM Technical Manual T/O Table of...exercises each year, both on Okinawa and throughout the Pacific theater. When equipment requires maintenance beyond the organizational -level...demand was analyzed based on customer cycle time (i.e., time that equipment was in Third Maintenance Battalion custody), maintenance cycle time during

  9. On risk-based operation and maintenance of offshore wind turbine components

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study...... of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect...

  10. Nutritional status and weight gain in pregnant women Estado nutricional y aumento de peso en la mujer embarazada Estado nutricional e ganho de peso de gestantes

    Directory of Open Access Journals (Sweden)

    Ana Paula Sayuri Sato

    2012-06-01

    Full Text Available This study described the nutritional status of 228 pregnant women and the influence of this on birth weight. This is a retrospective study, developed in a health center in the municipality of São Paulo, with data obtained from medical records. Linear regression analysis was carried out. An association was verified between the initial and final nutritional status (pEstado nutricional de 228 embarazadas y su influencia en el peso al nacer fue caracterizado. Estudio desarrollado en centro de salud de São Paulo con datos obtenidos de registros médicos. Análisis de regresión lineal fue realizado. Se verificó asociación entre estado nutricional inicial y final (pCaracterizou-se estado nutricional de 228 gestantes e sua influência no peso ao nascer. Trata-se de estudo retrospectivo desenvolvido num centro de saúde do município de São Paulo, com dados obtidos de prontuários. Realizou-se análise de regressão linear. Verificou-se associação entre estado nutricional inicial e final (p<0,001. A média de ganho total de peso diminuiu das gestantes que iniciaram a gravidez com baixo peso para aquelas que iniciaram com sobrepeso/obesidade (p=0,005, sendo insuficiente para 43,4 e 36,4% das gestantes com peso inicial adequado e para o total das gestantes estudadas, respectivamente. Entretanto, 37,1% daquelas que iniciaram a gravidez com sobrepeso/obesidade finalizaram com ganho excessivo, condição que, no final, afetou quase um quarto das gestantes. Anemia e baixo peso ao nascer foram pouco frequentes, porém, na análise de regressão linear, peso ao nascer associou-se com ganho de peso (p<0,05. Evidencia-se a importância do cuidado nutricional antes e durante a gravidez, para promoção da saúde materno-infantil.

  11. Knowledge-based machine indexing from natural language text: Knowledge base design, development, and maintenance

    Science.gov (United States)

    Genuardi, Michael T.

    1993-01-01

    One strategy for machine-aided indexing (MAI) is to provide a concept-level analysis of the textual elements of documents or document abstracts. In such systems, natural-language phrases are analyzed in order to identify and classify concepts related to a particular subject domain. The overall performance of these MAI systems is largely dependent on the quality and comprehensiveness of their knowledge bases. These knowledge bases function to (1) define the relations between a controlled indexing vocabulary and natural language expressions; (2) provide a simple mechanism for disambiguation and the determination of relevancy; and (3) allow the extension of concept-hierarchical structure to all elements of the knowledge file. After a brief description of the NASA Machine-Aided Indexing system, concerns related to the development and maintenance of MAI knowledge bases are discussed. Particular emphasis is given to statistically-based text analysis tools designed to aid the knowledge base developer. One such tool, the Knowledge Base Building (KBB) program, presents the domain expert with a well-filtered list of synonyms and conceptually-related phrases for each thesaurus concept. Another tool, the Knowledge Base Maintenance (KBM) program, functions to identify areas of the knowledge base affected by changes in the conceptual domain (for example, the addition of a new thesaurus term). An alternate use of the KBM as an aid in thesaurus construction is also discussed.

  12. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  13. Geometric Process-Based Maintenance and Optimization Strategy for the Energy Storage Batteries

    Directory of Open Access Journals (Sweden)

    Yan Li

    2016-01-01

    Full Text Available Renewable energy is critical for improving energy structure and reducing environment pollution. But its strong fluctuation and randomness have a serious effect on the stability of the microgrid without the coordination of the energy storage batteries. The main factors that influence the development of the energy storage system are the lack of valid operation and maintenance management as well as the cost control. By analyzing the typical characteristics of the energy storage batteries in their life cycle, the geometric process-based model including the deteriorating system and the improving system is firstly built for describing the operation process, the preventive maintenance process, and the corrective maintenance process. In addition, this paper proposes an optimized management strategy, which aims to minimize the long-run average cost of the energy storage batteries by defining the time interval of the detection and preventive maintenance process as well as the optimal corrective maintenance times, subjected to the state of health and the reliability conditions. The simulation is taken under the built model by applying the proposed energy storage batteries’ optimized management strategy, which verifies the effectiveness and applicability of the management strategy, denoting its obvious practicality on the current application.

  14. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  15. Feature-based and object-based attention orientation during short-term memory maintenance.

    Science.gov (United States)

    Ku, Yixuan

    2015-12-01

    Top-down attention biases the short-term memory (STM) processing at multiple stages. Orienting attention during the maintenance period of STM by a retrospective cue (retro-cue) strengthens the representation of the cued item and improves the subsequent STM performance. In a recent article, Backer et al. (Backer KC, Binns MA, Alain C. J Neurosci 35: 1307-1318, 2015) extended these findings from the visual to the auditory domain and combined electroencephalography to dissociate neural mechanisms underlying feature-based and object-based attention orientation. Both event-related potentials and neural oscillations explained the behavioral benefits of retro-cues and favored the theory that feature-based and object-based attention orientation were independent. Copyright © 2015 the American Physiological Society.

  16. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  17. Avaliação genética de touros usando produção em lactações completas ou parciais projetadas: 3. Confiabilidade e ganhos genéticos

    Directory of Open Access Journals (Sweden)

    Melo Cláudio Manoel Rodrigues de

    2000-01-01

    Full Text Available Para estudar a viabilidade de se usarem produções em lactações parciais, projetadas, na avaliação do mérito genético de touros, foram utilizadas 4595 lactações de 2254 vacas, filhas de 145 touros de 1618 matrizes, distribuídas em 18 rebanhos, com partos entre 1980 e 1997. A partir de 91, 151, 211 ou 241 dias de lactação, projetaram-se 10, 30, 50 ou 70% das lactações, para a duração da lactação observada e para 305 dias. As estimativas dos parâmetros genéticos foram obtidas pelo sistema MTDFREML. Incluíram-se no modelo, independente da característica, efeitos fixos de rebanho-ano, época de parto e idade da vaca ao parto, com termos linear e quadrático, considerando-se efeitos aleatórios de animal, efeito permanente de ambiente e erro. A média das confiabilidades, obtida por meio das produções estimadas (PE, variou de 0,60 a 0,67, utilizando-se P305 igual a 0,60. O ganho genético anual pela seleção dos touros utilizando as PE foi, em média, 24,27% maior que o ganho genético anual da P305, quando as lactações foram projetadas para a duração da lactação observada, e 25,65% superior, quando as lactações foram projetadas para P305. As confiabilidades obtidas, bem como os ganhos genéticos anuais estimados nas avaliações genéticas, usando as PE, foram semelhantes àquelas obtidas para a produção de leite até 305 dias.

  18. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...

  19. Cernavoda NPP risk - Based test and maintenance planning - Methodology development

    International Nuclear Information System (INIS)

    Georgescu, G.; Popa, P.; Petrescu, A.; Naum, M.; Gutu, M.

    1997-01-01

    The Cernavoda Power Plant starts the commercial operation in November 1996. During operation of the nuclear power plant, several mandatory tests and maintenance are performed on stand-by safety system components to ensure their availability in case of accident. The basic purpose of such activities is the early detection of any failure and degradation, and timely correction of deteriorations. Because of the large number of such activities, emphasis on plant safety and allocation of resources becomes difficult. The probabilistic model and methodology can be effectively used to obtain the risk significance of these activities so that the resources are directed to the most important areas. The proposed Research Contract activity is strongly connected with other safety related areas under development. Since, the Cernavoda Probabilistic Safety Evaluation Level 1 PSA Study (CPSE) was performed and now the study is revised taking into account the as-built information, it is recommended to implement into the model the necessary modeling features to support further PSA application, especially related to Test and Maintenance optimization. Methods need to be developed in order to apply the PSA model including risk information together with other needed information for Test and Maintenance optimization. Also, in parallel with the CPSE study updating, the software interface for the PSA model is under development (Risk Monitor Software class), methods and models needing to be developed for the purpose of using it for qualified monitoring of Test and Maintenance Strategy efficiency. Similar, the Data Collection System need to be appropriate for the purpose of an ongoing implementation of a risk - based Test and Maintenance Strategy. (author). 4 refs, 1 fig

  20. Risk-based inspection and maintenance systems for steam turbines

    International Nuclear Information System (INIS)

    Fujiyama, Kazunari; Nagai, Satoshi; Akikuni, Yasunari; Fujiwara, Toshihiro; Furuya, Kenichiro; Matsumoto, Shigeru; Takagi, Kentaro; Kawabata, Taro

    2004-01-01

    The risk-based maintenance (RBM) system has been developed for steam turbine plants coupled with the quick inspection systems. The RBM system utilizes the field failure and inspection database accumulated over 30 years. The failure modes are determined for each component of steam turbines and the failure scenarios are described as event trees. The probability of failure is expressed in the form of unreliability functions of operation hours or start-up cycles through the cumulative hazard function method. The posterior unreliability is derived from the field data analysis according to the inspection information. Quick inspection can be conducted using air-cooled borescope and heat resistant ultrasonic sensors even if the turbine is not cooled down sufficiently. Another inspection information comes from degradation and damage measurement. The probabilistic life assessment using structural analysis and statistical material properties, the latter is estimated from hardness measurement, replica observation and embrittlement measurement. The risk function is calculated as the sum product of unreliability functions and expected monetary loss as the consequence of failure along event trees. The optimum maintenance plan is determined among simulated scenarios described through component breakdown trees, life cycle event trees and risk functions. Those methods are effective for total condition assessment and economical maintenance for operating plants

  1. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    Science.gov (United States)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once

  2. Knowledge maintenance in myCBR

    OpenAIRE

    Aul, Vani; Sauer, Christian; Roth-Berghofer, Thomas

    2014-01-01

    CBR systems, being knowledge based systems, process knowledge. Due to changes in the environment a CBR system’s knowledge model can become outdated, thus creating a need for constant maintenance of said knowledge model. In this paper, we describe an implementation of (semi-)automatic knowledge maintenance of two of the four knowledge containers of CBR systems, specifically case base maintenance and maintenance of similarity measures within the CBR system development SDK myCBR. We describe our...

  3. Maintenance cost optimization in condition based maintenance: a case study for critical facilities

    OpenAIRE

    Filippo De Carlo; Maria Antonietta Arleo

    2013-01-01

    The increasing availability required to industrial plants and the limited budget often existing to assure it, require a careful formulation of maintenance optimization models. This need is primary for process plants, for which minimization of stops and maximization of their availability, are essential for ensuring targeted production and, therefore, profitability. In this context, the choice of the maintenance strategy is hence fundamental, depending on the system features and then on the eff...

  4. Computer-Based Simulations for Maintenance Training: Current ARI Research. Technical Report 544.

    Science.gov (United States)

    Knerr, Bruce W.; And Others

    Three research efforts that used computer-based simulations for maintenance training were in progress when this report was written: Game-Based Learning, which investigated the use of computer-based games to train electronics diagnostic skills; Human Performance in Fault Diagnosis Tasks, which evaluated the use of context-free tasks to train…

  5. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  6. Research on gesture recognition of augmented reality maintenance guiding system based on improved SVM

    Science.gov (United States)

    Zhao, Shouwei; Zhang, Yong; Zhou, Bin; Ma, Dongxi

    2014-09-01

    Interaction is one of the key techniques of augmented reality (AR) maintenance guiding system. Because of the complexity of the maintenance guiding system's image background and the high dimensionality of gesture characteristics, the whole process of gesture recognition can be divided into three stages which are gesture segmentation, gesture characteristic feature modeling and trick recognition. In segmentation stage, for solving the misrecognition of skin-like region, a segmentation algorithm combing background mode and skin color to preclude some skin-like regions is adopted. In gesture characteristic feature modeling of image attributes stage, plenty of characteristic features are analyzed and acquired, such as structure characteristics, Hu invariant moments features and Fourier descriptor. In trick recognition stage, a classifier based on Support Vector Machine (SVM) is introduced into the augmented reality maintenance guiding process. SVM is a novel learning method based on statistical learning theory, processing academic foundation and excellent learning ability, having a lot of issues in machine learning area and special advantages in dealing with small samples, non-linear pattern recognition at high dimension. The gesture recognition of augmented reality maintenance guiding system is realized by SVM after the granulation of all the characteristic features. The experimental results of the simulation of number gesture recognition and its application in augmented reality maintenance guiding system show that the real-time performance and robustness of gesture recognition of AR maintenance guiding system can be greatly enhanced by improved SVM.

  7. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    International Nuclear Information System (INIS)

    Graeber, U.

    2003-01-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  8. A maintenance optimization model for mission-oriented systems based on Wiener degradation

    International Nuclear Information System (INIS)

    Guo, Chiming; Wang, Wenbin; Guo, Bo; Si, Xiaosheng

    2013-01-01

    Over the past few decades, condition-based maintenance (CBM) has attracted many researchers because of its effectiveness and practical significance. This paper deals with mission-oriented systems subject to gradual degradation modeled by a Wiener stochastic process within the context of CBM. For a mission-oriented system, the mission usually has constraints on availability/reliability, the opportunity for maintenance actions, and the monitoring type (continuous or discrete). Furthermore, in practice, a mission-oriented system may undertake some preventive maintenance (PM) and after such PM, the system may return to an intermediate state between an as-good-as new state and an as-bad-as old state, i.e., the PM is not perfect and only partially restores the system. However, very few CBM models integrated these mission constraints together with an imperfect nature of the PM into the course of optimizing the PM policy. This paper develops a model to optimize the PM policy in terms of the maintenance related cost jointly considering the mission constraints and the imperfect PM nature. A numerical example is presented to demonstrate the proposed model. The comparison with the simulated results and the sensitivity analysis show the usefulness of the optimization model for mission-oriented system maintenance presented in this paper.

  9. A cost effective degradation-based maintenance strategy under imperfect repair

    International Nuclear Information System (INIS)

    Wu, Fan; Niknam, Seyed A.; Kobza, John E.

    2015-01-01

    An optimization model is developed to minimize the total cost of imperfect degradation-based maintenance by determining an optimal interval of condition monitoring and the degradation level after imperfect preventive repairs. The decision model is based on a novel cost model that considers functional relationship between the expected degradation reduction and the cost of preventive repairs. The decision model is applied to simulated vibration signals with a variety of specifications of cost values and degradation model parameters. This study has initiated a new area for the research of cost effective maintenance strategies. The results clearly indicate the significance of the proposed model and the decision variables under the objective of minimal cost. For instance, the results indicate direct relationship between the optimal length of monitoring interval and the monitoring cost. However, longer monitoring interval increases the risk of failure, and therefore, more degradation reduction is needed. By increasing the slope of cumulative degradation, the cost effective strategy advocates taking more frequent monitoring. The optimal degradation level after each preventive repair is not so sensitive to the change in the degradation slope due to the uncertainty associated with degradation patterns. - Highlights: • Discuss the relationship of degradation reduction and maintenance cost. • Determine the optimal interval of condition monitoring with minimal cost. • Identify the optimal degradation level after imperfect preventive repairs. • Discuss the effects of change in the slope of cumulative degradation.

  10. Routine maintenance: safety term based work selection; Selecao de trabalho baseado no prazo seguro

    Energy Technology Data Exchange (ETDEWEB)

    Camargo, Albair de; Filho, Antnio S.; Brendler, Fabiano E.; Adamatti, Gilberto A.; Naruto, Itiro; Araujo, Luiz C.F.; Puerari, Roberto [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    This work has objective to present the experience of improvement of routine maintenance system in some refineries of the PETROBRAS system, with the purpose to increase the efficiency in the Industrial Maintenance Management (cost), Utilization and HSE (Health, Safety and Environment), key of success of a petroleum company. The new system is based on the implantation of the culture of work selection in the safe period, through elaboration of new maintenance procedure, with emphasis in decisions shared between Operation and Maintenance Team, resulting in reduction of emergencies, making possible contract of services of maintenance for packages and improved allocation of resources. This work treat about improvement of the system in use, in view of that it has already taken in consideration the consequence of fail in the maintenance with participation of the operators. Besides of these challenge, this modification was made without causing riots in the process of implantation of SAP. As main result, financial profits had got better of resources with increase of safety, considering that they are analyzed in a way it that systematized potential risks. (author)

  11. A reliability-based preventive maintenance methodology for the projection spot welding machine

    Directory of Open Access Journals (Sweden)

    Fayzimatov Ulugbek

    2018-06-01

    Full Text Available An effective operations of a projection spot welding (PSW machine is closely related to the effec-tiveness of the maintenance. Timely maintenance can prevent failures and improve reliability and maintainability of the machine. Therefore, establishing the maintenance frequency for the welding machine is one of the most important tasks for plant engineers. In this regard, reliability analysis of the welding machine can be used to establish preventive maintenance intervals (PMI and to identify the critical parts of the system. In this reliability and maintainability study, analysis of the PSW machine was carried out. The failure and repair data for analysis were obtained from automobile manufacturing company located in Uzbekistan. The machine was divided into three main sub-systems: electrical, pneumatic and hydraulic. Different distributions functions for all sub-systems was tested and their parameters tabulated. Based on estimated parameters of the analyzed distribu-tions, PMI for the PSW machines sub-systems at different reliability levels was calculated. Finally, preventive measures for enhancing the reliability of the PSW machine sub-systems are suggested.

  12. Imperfect Preventive Maintenance Model Study Based On Reliability Limitation

    Directory of Open Access Journals (Sweden)

    Zhou Qian

    2016-01-01

    Full Text Available Effective maintenance is crucial for equipment performance in industry. Imperfect maintenance conform to actual failure process. Taking the dynamic preventive maintenance cost into account, the preventive maintenance model was constructed by using age reduction factor. The model regards the minimization of repair cost rate as final target. It use allowed smallest reliability as the replacement condition. Equipment life was assumed to follow two parameters Weibull distribution since it was one of the most commonly adopted distributions to fit cumulative failure problems. Eventually the example verifies the rationality and benefits of the model.

  13. Avaliação do ganho funcional do cotovelo com a cirurgia de Steindler na lesão do plexo braquial

    OpenAIRE

    Rezende,Marcelo Rosa de; Massa,Bruno Sergio Ferreira; Furlan,Fernando Cesar; Mattar Junior,Rames; Paula,Emygdio Jose Leomil de; Santos,Simone Silva e; Freitas,Maura Cristina

    2011-01-01

    OBJETIVO: Avaliar ganho de força e amplitude de movimento do cotovelo após cirurgia de Steindler Modificada em pacientes com lesão do tronco superior do plexo braquial. MÉTODO: Foram acompanhados de 1998 a 2007 onze pacientes com lesão traumática fechada do tronco superior do plexo braquial. Todos apresentavam evolução de pelo menos 1 ano da lesão e grau de força de flexão do cotovelo que variou de M1 a M3. Os pacientes foram submetidos à cirurgia de Steindler modificada e seguidos por períod...

  14. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  15. MOVES: A knowledge-based system for maintenance planning for motor-operated valves

    International Nuclear Information System (INIS)

    Winter, M.

    1987-01-01

    Over the past several years, knowledge-based expert systems have emerged as an important part of the general research area known as artificial intelligence. This paper describes a cooperative effort between faculty members at Iowa State University and engineers at the Duane Arnold Energy Center [a 545-MW(electric) boiling water reactor operated by Iowa Electric Light and Power Company] to explore the development of an advisory system for valve maintenance planning. This knowledge-based program, known as Motor-Operated Valves Expert System (MOVES), has a data base that currently includes safety-related motor-operated valves (∼117 valves). Valve maintenance was selected as the subject for the expert system because of the importance of valves in nuclear plant and their impact of plant availability. MOVES is being developed using the microcomputer-(IBM compatible) based expert system tool INSIGHT2+. The authors have found that the project benefits both the university and the utility

  16. A probabilistic maintenance model for diesel engines

    Science.gov (United States)

    Pathirana, Shan; Abeygunawardane, Saranga Kumudu

    2018-02-01

    In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.

  17. Experimental study on the plant state estimation for the condition-based maintenance

    International Nuclear Information System (INIS)

    Harada, J. I.; Takahashi, M.; Kitamura, M.; Wakabayashi, T.

    2006-01-01

    A framework of maintenance support system based on the plant state estimation using diverse methods has been proposed and the validity of the plant state estimation methods has been experimentally evaluated. The focus has been set on the construction of the BN for the objective system with the scale and complexity as same as real world systems. Another focus has been set on the other functions for maintenance support system such as signal processing tool and similarity matching. The validity of the proposed inference method has been confirmed through numerical experiments. (authors)

  18. Integrated vibration-based maintenance: an approach for continuous reduction in LCC. A case study

    Energy Technology Data Exchange (ETDEWEB)

    Najjar, B [ER Konsult Utveckling AB, Vaexjoe (Sweden)

    1999-12-31

    The biggest thread in achieving and maintaining high equipment effectiveness can be stated as: whether the improved manufacturing processes capable of producing quality products at a competitive cost. The effect of a new vibration-based maintenance concept, called Total Quality Maintenance (TQMain), is introduced. It aims to make intensive use of the real-time data acquisition and analysis to detect causes behind product quality deviation and failures in machinery, and following defect development at an early stage to increase machine mean effective life and improve company`s economics. The effect of TQMain on LCC of machinery and company`s economics is discussed. A case study to reveal savings in maintenance cost when a vibration-based policy involved, is presented. Using TQMain, company`s economics can be improved effectively through continuous improvement of the technical and economic effectiveness of production processes. (orig.) 14 refs.

  19. Integrated vibration-based maintenance: an approach for continuous reduction in LCC. A case study

    Energy Technology Data Exchange (ETDEWEB)

    Najjar, B. [ER Konsult Utveckling AB, Vaexjoe (Sweden)

    1998-12-31

    The biggest thread in achieving and maintaining high equipment effectiveness can be stated as: whether the improved manufacturing processes capable of producing quality products at a competitive cost. The effect of a new vibration-based maintenance concept, called Total Quality Maintenance (TQMain), is introduced. It aims to make intensive use of the real-time data acquisition and analysis to detect causes behind product quality deviation and failures in machinery, and following defect development at an early stage to increase machine mean effective life and improve company`s economics. The effect of TQMain on LCC of machinery and company`s economics is discussed. A case study to reveal savings in maintenance cost when a vibration-based policy involved, is presented. Using TQMain, company`s economics can be improved effectively through continuous improvement of the technical and economic effectiveness of production processes. (orig.) 14 refs.

  20. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  1. Efeito da vitamina C no ganho de peso e em parâmetros hematológicos de tambaqui Effect of vitamin C on weight and hematology of tambaqui

    Directory of Open Access Journals (Sweden)

    Edsandra Campos Chagas

    2003-03-01

    Full Text Available O objetivo deste trabalho foi avaliar o efeito da suplementação dietária com ácido L-ascórbico (vitamina C no ganho de peso e em parâmetros hematológicos de juvenis de tambaqui, Colossoma macropomum. Após dez semanas, em que foram alimentados com dietas contendo 0, 100 e 500 mg de ácido L-ascórbico por kg de ração, os peixes foram capturados e imediatamente anestesiados para a coleta de sangue da veia caudal e determinação dos parâmetros hematológicos. Animais alimentados com maiores níveis de ascorbato mostraram pesos corpóreos maiores, melhores taxas de conversão alimentar e sobrevivência. A asência de ácido L-ascórbico na ração, além de causar redução nos valores de hematócrito e no número de eritrócitos, que caracteriza anemia, provocou aumento no volume corpuscular médio, na hemoglobina corpuscular média e na concentração de hemoglobina corpuscular média. Esses resultados revelam a importância do ácido L-ascórbico na dieta dos juvenis de tambaqui. O nível de 100 mg de ácido L-ascórbico/kg de ração é adequado, garantindo bom ganho de peso e manutenção da homeostase do organismo.The objective of this work was to estimate the effect of L-ascorbic acid (vitamin C dietary supplementation on the body weight and on the hematology of juveniles tambaqui, Colossoma macropomum. After ten weeks receiving diets containing 0, 100 and 500 mg of L-ascorbic acid per kg of food, the fish were netted from the tanks, immediately anesthetized and blood was withdrawn from caudal vein for analysis of hematological parameters. Animals fed on higher ascorbate levels showed higher final body weight, better feed conversion rate and survival. Also, the L-ascorbic acid free-diet resulted in reduction of hematocrit and red blood cell count, characterizing anemia, and an increase of mean cell volume, mean cellular hemoglobin and mean cellular hemoglobin concentration. These results show the importance of L-ascorbic acid

  2. Maintenance-based prognostics of nuclear plant equipment for long-term operation

    Energy Technology Data Exchange (ETDEWEB)

    Welz, Zachary; Coble, Jamie; Upadhyaya, Belle; Hines, Wes [University of Tennessee, Knoxville (United States)

    2017-08-15

    While industry understands the importance of keeping equipment operational and well maintained, the importance of tracking maintenance information in reliability models is often overlooked. Prognostic models can be used to predict the failure times of critical equipment, but more often than not, these models assume that all maintenance actions are the same or do not consider maintenance at all. This study investigates the influence of integrating maintenance information on prognostic model prediction accuracy. By incorporating maintenance information to develop maintenance-dependent prognostic models, prediction accuracy was improved by more than 40% compared with traditional maintenance-independent models. This study acts as a proof of concept, showing the importance of utilizing maintenance information in modern prognostics for industrial equipment.

  3. Basic Concept and Theoretical Study of Condition-based Maintenance for Power Transmission System

    Institute of Scientific and Technical Information of China (English)

    LIMing; HAN Xueshan; YANG Ming; GUO Zhihong

    2011-01-01

    The appropriate maintenance time for the single equipment can be found easily and efficiently under the background of condition-based maintenance. However, from the perspective of the whole power system, discrepancy between equipment individual and the whole power system would appear. Once this discrepancy can not be coordinated, it will certainly cause contradiction and conflict between individual equipment and the whole system, and lose the integral efficiency. To solve this contradiction and conflicts is of significant meaning.

  4. Automotive Maintenance Data Base for Model Years 1976-1979. Part I

    Science.gov (United States)

    1980-12-01

    An update of the existing data base was developed to include life cycle maintenance costs of representative vehicles for the model years 1976-1979. Repair costs as a function of time are also developed for a passenger car in each of the compact, subc...

  5. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  6. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  7. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  8. Utility based maintenance analysis using a Random Sign censoring model

    International Nuclear Information System (INIS)

    Andres Christen, J.; Ruggeri, Fabrizio; Villa, Enrique

    2011-01-01

    Industrial systems subject to failures are usually inspected when there are evident signs of an imminent failure. Maintenance is therefore performed at a random time, somehow dependent on the failure mechanism. A competing risk model, namely a Random Sign model, is considered to relate failure and maintenance times. We propose a novel Bayesian analysis of the model and apply it to actual data from a water pump in an oil refinery. The design of an optimal maintenance policy is then discussed under a formal decision theoretic approach, analyzing the goodness of the current maintenance policy and making decisions about the optimal maintenance time.

  9. Condition-based maintenance effectiveness for series–parallel power generation system—A combined Markovian simulation model

    International Nuclear Information System (INIS)

    Azadeh, A.; Asadzadeh, S.M.; Salehi, N.; Firoozi, M.

    2015-01-01

    Condition-based maintenance (CBM) is an increasingly applicable policy in the competitive marketplace as a means of improving equipment reliability and efficiency. Not only has maintenance a close relationship with safety but its costs also make it even more attractive issue for researchers. This study proposes a model to evaluate the effectiveness of CBM policy compared to two other maintenance policies: Corrective Maintenance (CM) and Preventive Maintenance (PM). Maintenance policies are compared through two system performance indicators: reliability and cost. To estimate the reliability and costs of the system, the proposed Markovian discrete-event simulation model is developed under each of these policies. The applicability and usefulness of the proposed Markovian simulation model is illustrated for a series–parallel power generation system. The simulated characteristics of CBM system include its prognostics efficiency to estimate remaining useful life of the equipment. Results show that with an efficient prognostics, CBM policy is an effective strategy compared to other maintenance strategies. - Highlights: • A model is developed to evaluate the effectiveness of CBM policy. • Maintenance policies are compared through reliability and cost. • A Markovian simulation model is developed. • A series–parallel power generation system is considered. • CBM is an effective strategy compared to others

  10. Optimization of surface maintenance

    International Nuclear Information System (INIS)

    Oeverland, E.

    1990-01-01

    The present conference paper deals with methods of optimizing the surface maintenance of steel-made offshore installations. The paper aims at identifying important approaches to the problems regarding the long-range planning of an economical and cost effective maintenance program. The methods of optimization are based on the obtained experiences from the maintenance of installations on the Norwegian continental shelf. 3 figs

  11. Framework for Risk-based Planning of Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2009-01-01

    , and to sequential optimal decision making on planning of OM taking into account new information. Deterioration mechanisms such as fatigue, corrosion, wear and erosion are associated with significant uncertainty. Observations of the degree of damage can increase the reliability of predictions, especially......For offshore wind turbines, costs to operation and maintenance (OM) are substantial. This paper describes a risk-based life cycle approach for optimal planning of OM. The approach is based on pre-posterior Bayesian decision theory, and can be used both to overall, initial planning of OM...... in connection with condition-based maintenance. The approach can be used for gearboxes, generators, fatigue cracks, corrosion, etc. This paper also describes how probabilistic indicators can be used to quantify indirect information about the damage state for critical components, e.g. gearboxes....

  12. BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges

    Science.gov (United States)

    Dang, N. S.; Shim, C. S.

    2018-04-01

    Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.

  13. On risk-based operation and maintenance of offshore wind turbine components

    International Nuclear Information System (INIS)

    Jessen Nielsen, Jannie; Dalsgaard Sorensen, John

    2011-01-01

    Operation and maintenance are significant contributors to the cost of energy for offshore wind turbines. Optimal planning could rationally be based on Bayesian pre-posterior decision theory, and all costs through the lifetime of the structures should be included. This paper contains a study of a generic case where the costs are evaluated for a single wind turbine with a single component. Costs due to inspections, repairs, and lost production are included in the model. The costs are compared for two distinct maintenance strategies, namely with and without inclusion of periodic imperfect inspections. Finally the influence of different important parameters, e.g. failure rate, reliability of inspections, inspection interval, and decision rule for repairs, is evaluated.

  14. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  15. Paratireoidectomia na doença renal crônica: efeitos no ganho de peso e na melhora da qualidade de vida

    Directory of Open Access Journals (Sweden)

    Henyse Gomes Valente-Da-Silva

    Full Text Available RESUMO Objetivo: avaliar o benefício de paratireoidectomia em pacientes submetidos à hemodiálise, em relação ao estado nutricional e bioquímico, composição corporal e a qualidade de vida. Métodos: estudo longitudinal envolvendo 28 adultos em programa de hemodiálise, com hiperparatireoidismo secundário grave, avaliados antes e um ano após a cirurgia. Critérios de inclusão: níveis de paratormônio dez vezes superior ao valor de referencia e doença renal crônica em programa de hemodiálise. O índice de massa corporal foi utilizado para classificação do estado nutricional. A bioimpedância elétrica para avaliação da composição corporal. A análise bioquímica incluiu dosagem de lipídios e marcadores do metabolismo ósseo. A qualidade de vida foi avaliada pelo questionário SF36 (Short Form Health Survey. Todos os pacientes foram submetidos à paratireoidectomia total com implante em antebraço. Resultados: houve ganho significativo de peso corporal (61,7 vs 66,0 kg; p<0,001, da massa celular corporal (22,0 vs 24,5 kg/m2; p=0,05 e da qualidade de vida (p=0,001 após a cirurgia. Com relação ao metabolismo ósseo, PTH intacto, cálcio, fósforo e fosfatase alcalina, se estabilizaram e houve melhora em parâmetros bioquímicos, tais como albumina e hemoglobina. Conclusão: a paratireoidectomia melhora a sobrevida em pacientes de hemodiálise e está associada a aumento de peso, ganho de massa óssea e melhoria na qualidade de vida.

  16. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  17. Quantified Risk Ranking Model for Condition-Based Risk and Reliability Centered Maintenance

    Science.gov (United States)

    Chattopadhyaya, Pradip Kumar; Basu, Sushil Kumar; Majumdar, Manik Chandra

    2017-06-01

    In the recent past, risk and reliability centered maintenance (RRCM) framework is introduced with a shift in the methodological focus from reliability and probabilities (expected values) to reliability, uncertainty and risk. In this paper authors explain a novel methodology for risk quantification and ranking the critical items for prioritizing the maintenance actions on the basis of condition-based risk and reliability centered maintenance (CBRRCM). The critical items are identified through criticality analysis of RPN values of items of a system and the maintenance significant precipitating factors (MSPF) of items are evaluated. The criticality of risk is assessed using three risk coefficients. The likelihood risk coefficient treats the probability as a fuzzy number. The abstract risk coefficient deduces risk influenced by uncertainty, sensitivity besides other factors. The third risk coefficient is called hazardous risk coefficient, which is due to anticipated hazards which may occur in the future and the risk is deduced from criteria of consequences on safety, environment, maintenance and economic risks with corresponding cost for consequences. The characteristic values of all the three risk coefficients are obtained with a particular test. With few more tests on the system, the values may change significantly within controlling range of each coefficient, hence `random number simulation' is resorted to obtain one distinctive value for each coefficient. The risk coefficients are statistically added to obtain final risk coefficient of each critical item and then the final rankings of critical items are estimated. The prioritization in ranking of critical items using the developed mathematical model for risk assessment shall be useful in optimization of financial losses and timing of maintenance actions.

  18. Structural maintenance planning based on historical data of corroded deck plates of tankers

    International Nuclear Information System (INIS)

    Garbatov, Y.; Guedes Soares, C.

    2009-01-01

    A probabilistic maintenance and repair analysis of tanker deck plates subjected to general corrosion is presented. The decisions about when to perform maintenance and repair on the structure are studied. Different practical scenarios are analyzed and optimum repair times are proposed. The optimum repair age and intervals are defined based on the statistical analysis of operational data using the Weibull model and some assumptions about the inspection and time needed for repair. The total cost is calculated in normalized form.

  19. Contabilidade de custos vs. contabilidade de ganhos: respostas às exigências da produção enxuta Cost accounting vs. throughput accounting: answer to the lean production's demands

    Directory of Open Access Journals (Sweden)

    José Antonio de Queiroz

    2010-01-01

    Full Text Available A produção enxuta tem provocado mudanças significativas nas empresas, mudanças estas que não vêm sendo acompanhadas pelos sistemas de gestão econômica, desenvolvidos sobre pressupostos equivocados da produção em massa que defendem que as otimizações locais isoladas resultam na otimização global da empresa. Deste modo, pode-se afirmar que a contabilidade de custos não é capaz de prover as informações necessárias à correta tomada de decisão nas empresas enxutas. Por outro lado, constata-se uma coerência entre os princípios da produção enxuta e os pressupostos que sustentam a contabilidade de ganhos da Teoria das Restrições. Sendo assim, o objetivo deste artigo é apresentar argumentos que respaldem estas afirmações, bem como justifiquem a necessidade da utilização da contabilidade de ganhos como base teórica para a proposta de um método de gestão econômica para a produção enxuta.Lean production has provoked significant changes in companies. These changes have not being followed by the economic management systems, which are developed based on mistaken assumptions made by mass production which argues that isolated local optimizations can lead to the global optimization of the company. In this way, it can be affirmed that cost accounting cannot provide the necessary information for decision making in lean companies. On the other hand, consistency is evidenced between the principles of the lean production and the assumptions that support the throughput accounting of the Theory of Constraints. Therefore, the objective of this article is to present arguments that corroborate these assertions and justify the necessity for the use of the throughput accounting as a theoretical basis for the proposal of an economic management method for lean production.

  20. A Condition Based Maintenance Approach to Forecasting B-1 Aircraft Parts

    Science.gov (United States)

    2017-03-23

    Air Force Institute of Technology AFIT Scholar Theses and Dissertations 3-23-2017 A Condition Based Maintenance Approach to Forecasting B-1 Aircraft...component’s life history where reliability forecasts could be stipulated based on a component’s current condition . One of the major issues their report noted...Engine Condition Monitoring System Specification. Contract Number DOT-CG-80513-A. Grand Prairie, TX. Air Force Materiel Command. (2011) Requirements For

  1. Dynamic decision-making for reliability and maintenance analysis of manufacturing systems based on failure effects

    Science.gov (United States)

    Zhang, Ding; Zhang, Yingjie

    2017-09-01

    A framework for reliability and maintenance analysis of job shop manufacturing systems is proposed in this paper. An efficient preventive maintenance (PM) policy in terms of failure effects analysis (FEA) is proposed. Subsequently, reliability evaluation and component importance measure based on FEA are performed under the PM policy. A job shop manufacturing system is applied to validate the reliability evaluation and dynamic maintenance policy. Obtained results are compared with existed methods and the effectiveness is validated. Some vague understandings for issues such as network modelling, vulnerabilities identification, the evaluation criteria of repairable systems, as well as PM policy during manufacturing system reliability analysis are elaborated. This framework can help for reliability optimisation and rational maintenance resources allocation of job shop manufacturing systems.

  2. An Enhanced Preventive Maintenance Optimization Model Based on a Three-Stage Failure Process

    Directory of Open Access Journals (Sweden)

    Ruifeng Yang

    2015-01-01

    Full Text Available Nuclear power plants are highly complex systems and the issues related to their safety are of primary importance. Probabilistic safety assessment is regarded as the most widespread methodology for studying the safety of nuclear power plants. As maintenance is one of the most important factors for affecting the reliability and safety, an enhanced preventive maintenance optimization model based on a three-stage failure process is proposed. Preventive maintenance is still a dominant maintenance policy due to its easy implementation. In order to correspond to the three-color scheme commonly used in practice, the lifetime of system before failure is divided into three stages, namely, normal, minor defective, and severe defective stages. When the minor defective stage is identified, two measures are considered for comparison: one is that halving the inspection interval only when the minor defective stage is identified at the first time; the other one is that if only identifying the minor defective stage, the subsequent inspection interval is halved. Maintenance is implemented immediately once the severe defective stage is identified. Minimizing the expected cost per unit time is our objective function to optimize the inspection interval. Finally, a numerical example is presented to illustrate the effectiveness of the proposed models.

  3. Prognostics and Condition-Based Maintenance: A New Approach to Precursive Metrics

    International Nuclear Information System (INIS)

    Jarrell, Donald B.; Sisk, Daniel R.; Bond, Leonard J.

    2004-01-01

    The assumptions used in the design basis of process equipment have always been as much art as science. The usually imprecise boundaries of the equipments' operational envelope provide opportunities for two major improvements in the operations and maintenance (O and M) of process machinery: (a) the actual versus intended machine environment can be understood and brought into much better alignment and (b) the end goal can define O and M strategies in terms of life cycle and economic management of plant assets.Scientists at the Pacific Northwest National Laboratory (PNNL) have performed experiments aimed at understanding and controlling aging of both safety-specific nuclear plant components and the infrastructure that supports essential plant processes. In this paper we examine the development of aging precursor metrics and their correlation with degradation rate and projected machinery failure.Degradation-specific correlations have been developed at PNNL that will allow accurate physics-based diagnostic and prognostic determinations to be derived from a new view of condition-based maintenance. This view, founded in root cause analysis, is focused on quantifying the primary stressor(s) responsible for degradation in the component of interest and formulating a deterministic relationship between the stressor intensity and the resulting degradation rate. This precursive relationship between the performance, degradation, and underlying stressor set is used to gain a first-principles approach to prognostic determinations. A holistic infrastructure approach, as applied through a conditions-based maintenance framework, will allow intelligent, automated diagnostic and prognostic programming to provide O and M practitioners with an understanding of the condition of their machinery today and an assurance of its operational state tomorrow

  4. A risk-based model for maintenance decision support of civil structures using RAMS

    NARCIS (Netherlands)

    Viana Da Rocha, T. C.; Stipanovic, I.; Hartmann, A.; Bakker, J.

    2017-01-01

    As a cornerstone of transportation asset management, risk-based approaches have been used to support maintenance decisions of civil structures. However, ambiguous and subjective risk criteria and inconsistency on the use of risk-based approaches can lead to a fuzzy understanding of the risks

  5. Condition Based Maintenance of Space Exploration Vehicles Using Structural Health Monitoring, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Acellent Technologies proposes to develop an autonomous and automated diagnostic system for condition based maintenance (CBM) of safety critical structures for space...

  6. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  7. An All-Recombinant Protein-Based Culture System Specifically Identifies Hematopoietic Stem Cell Maintenance Factors

    Directory of Open Access Journals (Sweden)

    Aki Ieyasu

    2017-03-01

    Full Text Available Hematopoietic stem cells (HSCs are considered one of the most promising therapeutic targets for the treatment of various blood disorders. However, due to difficulties in establishing stable maintenance and expansion of HSCs in vitro, their insufficient supply is a major constraint to transplantation studies. To solve these problems we have developed a fully defined, all-recombinant protein-based culture system. Through this system, we have identified hemopexin (HPX and interleukin-1α as responsible for HSC maintenance in vitro. Subsequent molecular analysis revealed that HPX reduces intracellular reactive oxygen species levels within cultured HSCs. Furthermore, bone marrow immunostaining and 3D immunohistochemistry revealed that HPX is expressed in non-myelinating Schwann cells, known HSC niche constituents. These results highlight the utility of this fully defined all-recombinant protein-based culture system for reproducible in vitro HSC culture and its potential to contribute to the identification of factors responsible for in vitro maintenance, expansion, and differentiation of stem cell populations.

  8. On the Use of Time-Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints

    Directory of Open Access Journals (Sweden)

    E. Khoury

    2013-01-01

    Full Text Available This paper deals with a gradually deteriorating system operating under an uncertain environment whose state is only known on a finite rolling horizon. As such, the system is subject to constraints. Maintenance actions can only be planned at imposed times called maintenance opportunities that are available on a limited visibility horizon. This system can, for example, be a commercial vehicle with a monitored critical component that can be maintained only in some specific workshops. Based on the considered system, we aim to use the monitoring data and the time-limited information for maintenance decision support in order to reduce its costs. We propose two predictive maintenance policies based, respectively, on cost and reliability criteria. Classical age-based and condition-based policies are considered as benchmarks. The performance assessment shows the value of the different types of information and the best way to use them in maintenance decision making.

  9. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    Energy Technology Data Exchange (ETDEWEB)

    Graeber, U.

    2003-07-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  10. Maintenance strategy for tilting table of rolling mill based on reliability considerations

    International Nuclear Information System (INIS)

    Deshpande, V.S.; Modak, J.P.

    2003-01-01

    tilting tables are 14 scheduled on-condition tasks, 10 scheduled on-restoration tasks, seven scheduled discard task. Whereas for 14 failure modes no scheduled maintenance has been proposed. Existing maintenance schedule for tilting tables indicates the maintenance action as and when required. Hence RCM based schedule specifies that additional preventive maintenance tasks need to be executed as compared to none initially. Cost incurred for this can be offset from the savings accrued from reduction in loss of production due to repetitive breakdowns. The methodology of RCM adopted in western industries cannot be applied as it is to Indian industries because of labour oriented nature, partially computerised information systems, non-availability of the information about cost of loss of production due to breakdown and age-reliability pattern of equipment, insufficient maintenance database. These problems can be overcome by development of sound MMIS, formulation of RCM review group and imparting suitable training to acquire the relevant skills in RCM. Thus RCM methodology can be applied to Indian industry for reduction of breakdowns as well as optimisation of preventive maintenance cost. This can further boost up the prospects of Indian industry to offer the products at globally competitive prices

  11. Research and Development of a Network-Based Intelligent Maintenance Information System

    Institute of Scientific and Technical Information of China (English)

    ZANG Tie-gang; YANG Ming-zhong; GUO Shun-sheng

    2003-01-01

    A maintenance information system is an important part of equipment management. An intelli gent maintenance information system ( IMIS) is a synthesis of network technology, information technology and intelligent technology. The IMIS is used to finish flexible maintenance decision-making and fast maintenance planning, which helps enterprises to effectively reduce maintenance cost and increase working efficiency. Because the IMIS integrates advanced technologies, its performance is better than a traditional one.The difference between an IMIS and a traditional maintenance information system, and the functions, structure, important realizations, and application of an IMIS are discussed in this paper.

  12. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  13. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  14. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  15. A dynamic predictive maintenance policy for complex multi-component systems

    International Nuclear Information System (INIS)

    Van Horenbeek, Adriaan; Pintelon, Liliane

    2013-01-01

    The use of prognostic methods in maintenance in order to predict remaining useful life is receiving more attention over the past years. The use of these techniques in maintenance decision making and optimization in multi-component systems is however a still underexplored area. The objective of this paper is to optimally plan maintenance for a multi-component system based on prognostic/predictive information while considering different component dependencies (i.e. economic, structural and stochastic dependence). Consequently, this paper presents a dynamic predictive maintenance policy for multi-component systems that minimizes the long-term mean maintenance cost per unit time. The proposed maintenance policy is a dynamic method as the maintenance schedule is updated when new information on the degradation and remaining useful life of components becomes available. The performance, regarding the objective of minimal long-term mean cost per unit time, of the developed dynamic predictive maintenance policy is compared to five other conventional maintenance policies, these are: block-based maintenance, age-based maintenance, age-based maintenance with grouping, inspection condition-based maintenance and continuous condition-based maintenance. The ability of the predictive maintenance policy to react to changing component deterioration and dependencies within a multi-component system is quantified and the results show significant cost savings

  16. Improvement of testing and maintenance based on fault tree analysis

    International Nuclear Information System (INIS)

    Cepin, M.

    2000-01-01

    Testing and maintenance of safety equipment is an important issue, which significantly contributes to safe and efficient operation of a nuclear power plant. In this paper a method, which extends the classical fault tree with time, is presented. Its mathematical model is represented by a set of equations, which include time requirements defined in the house event matrix. House events matrix is a representation of house events switched on and off through the discrete points of time. It includes house events, which timely switch on and off parts of the fault tree in accordance with the status of the plant configuration. Time dependent top event probability is calculated by the fault tree evaluations. Arrangement of components outages is determined on base of minimization of mean system unavailability. The results show that application of the method may improve the time placement of testing and maintenance activities of safety equipment. (author)

  17. Improvement of condition-based maintenance technology by utilization of thermography

    International Nuclear Information System (INIS)

    Shimada, Hiroki

    2004-01-01

    In the United States, condition-based maintenance technology comprising IR thermography (hereafter ''thermography'' for short) has been regarded in recent years as the established means for effectively improvement the performance of accident-preventive measures for nuclear power stations. As very few nuclear power plants in Japan have been utilizing the technology, measures for allowing power station personnel to use the technology with ease have been studied on an empirical basis. First, in view of improving the measuring efficiency to determine temperatures more accurately with a single measurement, principal factors affecting the measured temperature values have been analyzed. As a result, it has been found effective for accurate temperature measurement to make use of the table to radiation rates that have been determined for each facility coating specification by using a black body tape and to determine the measuring spot by avoiding rear heat sources (influence of reflection ratio) and background noise (influence of scattered light). Concurrently, as a result of determining the IR attenuation in the atmosphere, thermographic measurement has been found feasible without any significant attenuation as long as the distance is below 10 meters. Further, every power station facility (mainly electrical facilities) that is immune to thermography has been identified. These study results have been documented in the form of the ''Thermography Measurement Manual'' by also including in it the descriptions on abnormal thermal images and the judgment criteria at elevated temperatures that have been used in the United States. Based on these accomplishments, condition-based maintenance technology employing thermography has been applied to on-site investigation of nuclear power stations, and the effectiveness of thermography-aided accident-prevention has been demonstrated by detecting locally temperature rising spots of power cable joints. Moreover, with respect to maintenance

  18. Composição corporal e exigências nutricionais em cálcio e fósforo para ganho e mantença de cordeiros Santa Inês dos 15 kg aos 25 kg de peso vivo Body composition and requirements for calcium and phosphorus for gain and maintenance of Santa Ines lambs from 15 to 25 kg of body weight

    Directory of Open Access Journals (Sweden)

    Luciana Castro Geraseev

    2000-02-01

    Full Text Available RESUMO - Este trabalho foi conduzido para determinar a composição corporal e estimar as exigências de cálcio e fósforo de cordeiros da raça Santa Inês. Foram utilizados 18 cordeiros machos inteiros, com peso médio inicial de 15 kg, divididos em três grupos: seis animais abatidos no início do experimento, para avaliar o conteúdo de cálcio e fósforo corporal, servindo como animais referência para o método do abate comparativo; seis animais alimentados ad libitum; e seis com alimentação restrita (em nível de mantença + 20%. Os cordeiros que receberam dietas ad libitum e restritas entraram no experimento aos pares e foram abatidos concomitantemente, quando o primeiro atingiu 25 kg de peso vivo. A composição corporal foi estimada a partir de equações de regressão do logaritmo da quantidade de cálcio e fósforo presentes no corpo vazio, em função do logaritmo do peso corporal vazio. As exigências líquidas de mantença e o coeficiente de absorção destes minerais foram determinados a partir da correlação entre a quantidade de mineral ingerida e a quantidade retida no corpo, enquanto as exigências líquidas para o ganho em peso foram estimadas a partir da derivação de equações de predição da composição corporal. As exigências líquidas de mantença, para animais entre 15 e 25 kg de peso vivo, foram 305 mg de Ca/dia e 325 mg de P/dia e as exigências líquidas por kg de ganho de peso vivo, para animais com 15 e 25 kg de peso vivo, 11,41 e 10,33 g Ca e 5,72 e 4,94 g P, respectivamente. Os coeficientes de absorção encontrados neste trabalho foram 0,44 e 0,55 para Ca e P, respectivamente.ABSTRACT - The research was carried out to determine body composition and calcium and phosphorus requirements of Santa Ines lambs. Eighteen entire male lambs with average initial live weight of 15 kg were used. The animals were allotted to three groups: six animals were slaughtered at the beginning of the experiment, to access the

  19. Evaluation of artillery equipment maintenance support capability based on grey clustering

    Science.gov (United States)

    Zhai, Mei-jie; Gao, Peng

    2017-12-01

    This paper, the theory and method of evaluating the capability of equipment maintenance support in China and abroad are studied, from the point of view of the combat task of artillery troops and the strategic attachment in the future military struggle. This paper establishes the framework of the evaluation Index system of the equipment maintenance support capability of the artillery units, and applies the grey clustering method to the evaluation of the equipment maintenance support capability of the artillery units, and finally evaluates the equipment maintenance and support capability of the artillery brigade as an example, and analyzes the evaluation results. This paper finds out the outstanding problems existing in the maintenance and support of military equipment, and puts forward some constructive suggestions, in order to improve the status of military equipment maintenance and support and improve the level of future equipment maintenance.

  20. The virtual maintenance system: a computer-based support tool for robust design, product monitoring, fault diagnosis and maintenance planning

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks.

  1. Partial maintenance of auditory-based cognitive training benefits in older adults

    Science.gov (United States)

    Anderson, Samira; White-Schwoch, Travis; Choi, Hee Jae; Kraus, Nina

    2014-01-01

    The potential for short-term training to improve cognitive and sensory function in older adults has captured the public’s interest. Initial results have been promising. For example, eight weeks of auditory-based cognitive training decreases peak latencies and peak variability in neural responses to speech presented in a background of noise and instills gains in speed of processing, speech-in-noise recognition, and short-term memory in older adults. But while previous studies have demonstrated short-term plasticity in older adults, we must consider the long-term maintenance of training gains. To evaluate training maintenance, we invited participants from an earlier training study to return for follow-up testing six months after the completion of training. We found that improvements in response peak timing to speech in noise and speed of processing were maintained, but the participants did not maintain speech-in-noise recognition or memory gains. Future studies should consider factors that are important for training maintenance, including the nature of the training, compliance with the training schedule, and the need for booster sessions after the completion of primary training. PMID:25111032

  2. Lean thinking for a maintenance process

    Directory of Open Access Journals (Sweden)

    Sherif Mostafa

    2015-01-01

    Full Text Available The maintenance process shares significant operating costs in an organisation. Lean thinking can be incorporated into maintenance activities through applying its principles and practices/tools. Lean maintenance (LM is a prerequisite for lean manufacturing systems. This research proposes a new structure for LM process based on a systematic literature review of a significant number of related articles that were published on LM. The process structure is designed based on the five lean principles to guide and support organisations to pursue maintenance excellence. This study establishes a scheme for LM tools that are structured into 2 level 4 bundles and 26 lean practices/tools and develops a House of Waste (HoW to demonstrate the association between maintenance wastes and the LM tools. With a successful accomplishment of the proposed scheme, the performance of a maintenance department can create more improvement opportunities over time to reach the maintenance excellence status.

  3. The business case for condition-based maintenance: a hybrid (non-) financial approach

    NARCIS (Netherlands)

    Tiddens, W.W.; Tinga, T.; Braaksma, A.J.J.; Brouwer, O.; Cepin, Marko; Bris, Radim

    2017-01-01

    Although developing business cases is key for evaluating project success, the costs and benefits of condition-based maintenance (CBM) implementations are often not explicitly defined and evaluated. Using the design science methodology, we developed a hybrid business case approach to help managers

  4. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.

    As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types...... is described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  5. Development and Implementation of a Condition Based Maintenance Program for Geothermal Power Plants; FINAL

    International Nuclear Information System (INIS)

    Steve Miller; Jim Eddy; Murray Grande; Shawn Bratt; Manuchehr Shirmohamadi

    2002-01-01

    This report describes the development of the RCM team, identifying plant assets and developing an asset hierarchy, the development of sample Failure Mode Effects Analysis (FMEAs), identifying and prioritizing plant systems and components for RCM analysis, and identifying RCM/CBM software/hardware vendors. It also includes the Failure Mode Effects Analysis (FMEA) for all Class I Systems, Maintenance Task Assignments, use of Conditioned Based Maintenance (CBM) Tools and Displays of the RCM software System Development to date

  6. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  7. Condition-based maintenance at both scheduled and unscheduled opportunities

    NARCIS (Netherlands)

    Kalosi, S.; Kapodistria, S.; Resing, J.A.C.

    2016-01-01

    Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur due to periodic system reviews of the equipment, and

  8. APPLICATION OF ROUGH SET THEORY TO MAINTENANCE LEVEL DECISION-MAKING FOR AERO-ENGINE MODULES BASED ON INCREMENTAL KNOWLEDGE LEARNING

    Institute of Scientific and Technical Information of China (English)

    陆晓华; 左洪福; 蔡景

    2013-01-01

    The maintenance of an aero-engine usually includes three levels ,and the maintenance cost and period greatly differ depending on the different maintenance levels .To plan a reasonable maintenance budget program , airlines would like to predict the maintenance level of aero-engine before repairing in terms of performance parame-ters ,which can provide more economic benefits .The maintenance level decision rules are mined using the histori-cal maintenance data of a civil aero-engine based on the rough set theory ,and a variety of possible models of upda-ting rules produced by newly increased maintenance cases added to the historical maintenance case database are in-vestigated by the means of incremental machine learning .The continuously updated rules can provide reasonable guidance suggestions for engineers and decision support for planning a maintenance budget program before repai-ring .The results of an example show that the decision rules become more typical and robust ,and they are more accurate to predict the maintenance level of an aero-engine module as the maintenance data increase ,which illus-trates the feasibility of the represented method .

  9. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  10. Avaliação de sistemas de janela para suporte a decisões de projeto quanto ao equilíbrio de ganhos de luz e calor

    Directory of Open Access Journals (Sweden)

    Kamila Mendonça de Lima

    Full Text Available O projeto de janelas considera os efeitos do meio externo, tais como o ganho de calor solar e a iluminação natural, os quais podem ser conflitantes. Este trabalho avalia o desempenho de diferentes alternativas de sistemas de janela para suporte a decisões de projeto quanto ao equilíbrio de ganhos de luz e calor no ambiente interno, com ênfase no uso de escritório no contexto do clima quente e úmido. Para isso, simulações computacionais integradas utilizando os programas Daysim e EnergyPlus foram realizadas, considerando-se o acionamento das lâmpadas apenas quando a luz natural não é suficiente para atender ao uso do ambiente. Foram variados o percentual de área de abertura, o tipo de vidro e o ângulo de sombreamento, simultaneamente, identificando-se soluções de compromisso quanto aos critérios de disponibilidade e uniformidade da luz e demanda de energia elétrica no ambiente. O controle solar pelo uso de dispositivo de proteção solar apresentou resultados substancialmente melhores que o controle solar apenas pela redução da transmissão da radiação solar do vidro. A avaliação realizada contribui para o aprofundamento da compreensão do impacto de diferentes variáveis de projeto nos fenômenos que caracterizam o desempenho da abertura de uma edificação.

  11. Mathematical thinking of maintenance. Problem setting and solving bases

    International Nuclear Information System (INIS)

    2007-01-01

    Plant or mechanical facility for maintenance became more complicated than before and consisted of many subsystems made of various equipments or facilities with parts, which were a system having complicated and hierarchical structure. Maintenance was required to be properly implemented to assure reliability of a system for a long period so as for each equipment to play a specified role for a stable operation of plant. Mathematical thinking using probability theory was rational to optimize maintenance action with failure rate function of system or part of equipment. Reliability function, maintainability function and availability of plant and equipment were defined. Unreliability function was called failure time distribution function (F(t)) and failure rate function (λ(t)) was defined as the ratio of failure time density distribution function (dF(t)/dt) to reliability function (1-F(t)). λ(t) could be expressed as a simple equation with Weibull parameter. Availability at steady state was attributed to ratio of average operating time to sum of operating time and maintenance time, i.e. MTBF/(MTBF+MTTR) where MTBF was mean time between failures and MTTR was mean time to repair. Optimization of system risk and maintenance action was encouraged using computational science simulating material degradation. (T. Tanaka)

  12. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  13. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  14. PSO Based Optimization of Testing and Maintenance Cost in NPPs

    Directory of Open Access Journals (Sweden)

    Qiang Chou

    2014-01-01

    Full Text Available Testing and maintenance activities of safety equipment have drawn much attention in Nuclear Power Plant (NPP to risk and cost control. The testing and maintenance activities are often implemented in compliance with the technical specification and maintenance requirements. Technical specification and maintenance-related parameters, that is, allowed outage time (AOT, maintenance period and duration, and so forth, in NPP are associated with controlling risk level and operating cost which need to be minimized. The above problems can be formulated by a constrained multiobjective optimization model, which is widely used in many other engineering problems. Particle swarm optimizations (PSOs have proved their capability to solve these kinds of problems. In this paper, we adopt PSO as an optimizer to optimize the multiobjective optimization problem by iteratively trying to improve a candidate solution with regard to a given measure of quality. Numerical results have demonstrated the efficiency of our proposed algorithm.

  15. A condition-based maintenance policy with non-periodic inspections for a two-unit series system

    International Nuclear Information System (INIS)

    Castanier, B.; Grall, A.; Berenguer, C.

    2005-01-01

    This paper considers a condition-based maintenance policy for a two-unit deteriorating system. Each unit is subject to gradual deterioration and is monitored by sequential non-periodic inspections. It can be maintained by good as new preventive or corrective replacements. Every inspection or replacement entails a set-up cost and a component-specific unit cost but if actions on the two components are combined, the set-up cost is charged only once. A parametric maintenance decision framework is proposed to coordinate inspection/replacement of the two components and minimize the long-run maintenance cost of the system. A stochastic model is developed on the basis of the semi-regenerative properties of the maintained system state and the associated cost model is used to assess and optimize the performance of the maintenance model. Numerical experiments emphasize the interest of a control of the operation groupings

  16. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  17. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  18. Maintenance strategy based on reliability functions for an oil centrifugal pump

    Directory of Open Access Journals (Sweden)

    Denis Carlos Mengue

    2013-06-01

    Full Text Available The purpose of this article was to define the most appropriate maintenance strategy for a centrifugal pump (preventive, predictive, corrective or emergency, based on reliability calculation. The research method was the quantitative modeling, applied in a petroleum plant. The study may contribute to the development of a strategic model for the management of the industrial plant maintenance. In the company's information system, records of eleven years have been gathered on times between failures and times for repair of the equipment. These times were modeled by probability distributions. From the results obtained were calculated Reliability and Maintainability functions R(t and M(t. By combining their expected values (MTBF and MTTR, Av availability was calculated. The figures for MTBF, MTTR and Av were respectively 3,936 hours, 133 hours and 96.73%. The most likely shape factor of the Weibull distribution which modeled the time between failures was 0.69. So, it was possible to affirm that the pump is in the infant mortality phase. The theoretical framework of RCM indicated corrective  maintenance as the strategy for the item. This strategy aims to eliminate the defects of equipment design, reinforce items that usually break and remove the causes of the failures.

  19. Probability-based assessment and maintenance of welded joints damaged by fatigue

    International Nuclear Information System (INIS)

    Cremona, C.; Lukic, M.

    1998-01-01

    This paper presents a probabilistic reliability assessment procedure for steel components damaged by fatigue. The study combines the structural reliability theory with a maintenance strategy. The fatigue assessment model is based on a modelisation of the fatigue phenomenon issued from the principles of fracture mechanics theory. The safety margin includes the crack growth propagation and allows to treat fatigue damage in a general manner. Damaging cycles and non damaging cycles are distinguished. The sensitivity study of the different parameters shows that some variables can be taken as deterministic. Applications are made on a welded joint 'stiffener/bottom-plate' of a typical steel bridge. The model is then used for taking into account inspection results. Non destructive inspection (NDI) techniques are also used for updating failure probabilities. The results show their ability to be inserted in a maintenance strategy for optimizing the next inspection time. This has led to define cost functions related to the total maintenance cost; this cost is then minimized for determining the optimal next inspection time. An example of welded joint cracked by fatigue highlights the different concepts. The approach presented in the paper is not only restrained to fatigue problems, but can be applied to a wide variety of degrading phenomena. (orig.)

  20. Application of genetic algorithms to the maintenance scheduling optimization in a nuclear system basing on reliability

    International Nuclear Information System (INIS)

    Lapa, Celso M. Franklin; Pereira, Claudio M.N.A.; Mol, Antonio C. de Abreu

    1999-01-01

    This paper presents a solution based on genetic algorithm and probabilistic safety analysis that can be applied in the optimization of the preventive maintenance politic of nuclear power plant safety systems. The goal of this approach is to improve the average availability of the system through the optimization of the preventive maintenance scheduling politic. The auxiliary feed water system of a two loops pressurized water reactor is used as a sample case, in order to demonstrate the effectiveness of the proposed method. The results, when compared to those obtained by some standard maintenance politics, reveal quantitative gains and operational safety levels. (author)

  1. Optimal Medical Equipment Maintenance Service Proposal Decision Support System combining Activity Based Costing (ABC) and the Analytic Hierarchy Process (AHP).

    Science.gov (United States)

    da Rocha, Leticia; Sloane, Elliot; M Bassani, Jose

    2005-01-01

    This study describes a framework to support the choice of the maintenance service (in-house or third party contract) for each category of medical equipment based on: a) the real medical equipment maintenance management system currently used by the biomedical engineering group of the public health system of the Universidade Estadual de Campinas located in Brazil to control the medical equipment maintenance service, b) the Activity Based Costing (ABC) method, and c) the Analytic Hierarchy Process (AHP) method. Results show the cost and performance related to each type of maintenance service. Decision-makers can use these results to evaluate possible strategies for the categories of equipment.

  2. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  3. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    2000-03-01

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  4. Fissuras labiopalatinas, ganho de peso e cirurgias: leite materno versus fórmulas lácteas

    Directory of Open Access Journals (Sweden)

    Marcos Roberto Tovani Palone

    2015-10-01

    Full Text Available As fissuras labiopalatinas são as anomalias craniofaciais mais comuns na espécie humana. Por sua vez, com o propósito de ganho de peso corporal necessário para realização das cirurgias reabilitadoras, uma alternativa rotineiramente utilizada para crianças com fissuras consiste no uso de fórmulas lácteas industrializadas, como um substituto do leite materno ou mesmo uma suplementação alimentar. Contudo, é imprescindível a conscientização das mães e demais cuidadores desse grupo de crianças sobre a importância do aleitamento materno e seus benefícios adicionais, os quais inclusive colocam em questionamento a necessidade e viabilidade da prescrição dessas fórmulas nos casos em que a amamentação natural é possível. Ademais, o tipo de alimentação, aleitamento natural ou artificial é de notória importância, com influência direta na composição da microbiota gastrintestinal e possibilidades de impactos sobre a imunomodulação destes indivíduos.

  5. An experimental maintenance management system.

    Science.gov (United States)

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  6. Performance-based maintenance procurement by Dutch housing associations - Working paper ¿

    NARCIS (Netherlands)

    Straub, A.; van Mossel, H.J.

    2005-01-01

    Maintenance works are component services that are part of the final housing service to the tenant. Because main building maintenance works are designed each time again, it can be compared to product (service) development. With different types of cooperation with maintenance contractors, the degree

  7. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  8. 49 CFR Appendix E to Part 238 - General Principles of Reliability-Based Maintenance Programs

    Science.gov (United States)

    2010-10-01

    ... STANDARDS Pt. 238, App. E Appendix E to Part 238—General Principles of Reliability-Based Maintenance... 49 Transportation 4 2010-10-01 2010-10-01 false General Principles of Reliability-Based... the design level of safety and reliability of the equipment; (2) To restore safety and reliability to...

  9. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  10. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  11. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  12. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...

  13. Investigation of an innovative maintenance contracting strategy : the performance-based maintenance contract (PBMC).

    Science.gov (United States)

    2015-06-01

    One of the major responsibilities of state Departments of Transportation (DOTs) is to maintain their road assets so : that road users can travel cost effectively, safely, and in a timely manner. Maintenance projects can be performed : either by using...

  14. Reliability analysis and risk-based methods for planning of operation & maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2017-01-01

    for extreme and fatigue limit states are presented. Operation & Maintenance planning often follows corrective and preventive strategies based on information from condition monitoring and structural health monitoring systems. A reliability- and risk-based approach is presented where a life-cycle approach...

  15. Hypertext-based integration for nuclear plant maintenance and operations

    International Nuclear Information System (INIS)

    Tsoukalas, L.H.; Upadhyaya, B.R.

    1991-01-01

    A methodology is presented that uses fuzzy graphs in the emerging paradigm of hypertext for the purpose of integrating data, information and multifaceted knowledge resources abounding in power plant operations and maintenance. A hypertext system is viewed as a set of nodes and links where with each link we associate membership functions embodying context-dependent criteria for navigating large information spaces. A general framework for navigation is outlined and graph-theory navigational tools are developed. A numerical example and a HyperCard-based prototype for monitoring special material in the MHTGR-NPR are included. 10 refs., 12 figs

  16. The use of probabilistic safety assessment based maintenance indicators to increase the availability of safety related systems in nuclear power plants

    International Nuclear Information System (INIS)

    Kirchsteiger, C.

    1991-04-01

    This work describes the theoretical development of a Probabilistic Safety Assessment (PSA) based Performance Indicator (PI) model for a comprehensive Maintenance Efficiency Analysis (MEA) and its practical application to past operational history data of a certain Nuclear Power Plant. Plant specific equipment history and maintenance work order data have been collected and analysed using various advanced statistical procedures (nonparametric methods, multivariate analysis) in order to be able to estimate safety system related equipment and maintenance process trends. The main results of such a MEA case study are the trends in the (in)effectiveness of the performance of a selected safety system and its dominant maintenance related causes of its bad (good) equipment performance. Finally, the therefrom gained results are used to propose a new set of safety system based and maintenance related Performance Indicators, including suggestions for a corresponding plant specific maintenance data collection system. (author)

  17. Increasing the competitiveness of maintenance contract rates by using an alternative methodology for the calculation of average vehicle maintenance costs

    Directory of Open Access Journals (Sweden)

    Stephen Carstens

    2008-11-01

    Full Text Available Companies tend to outsource transport to fleet management companies to increase efficiencies if transport is a non-core activity. The provision of fleet management services on contract introduces a certain amount of financial risk to the fleet management company, specifically fixed rate maintenance contracts. The quoted rate needs to be sufficient and also competitive in the market. Currently the quoted maintenance rates are based on the maintenance specifications of the manufacturer and the risk management approach of the fleet management company. This is usually reflected in a contingency that is included in the quoted maintenance rate. An alternative methodology for calculating the average maintenance cost for a vehicle fleet is proposed based on the actual maintenance expenditures of the vehicles and accepted statistical techniques. The proposed methodology results in accurate estimates (and associated confidence limits of the true average maintenance cost and can beused as a basis for the maintenance quote.

  18. Integrated maintenance management model in the printing industry

    Directory of Open Access Journals (Sweden)

    Csaba Horváth

    2010-09-01

    Full Text Available Rapid technological and economic changes are setting radically new task for maintenance divisions of printingworks. In this dissertation the author provides a summary on the possible approaches for the adoption to the newrequirements. He formulates his situation analysis based on an exhaustive questionnaire survey, and points out thecurrents of changes and challenges caused by the expected developments in the maintenance field of the printingindustry.Based on the possible answers on these challenges, the Author has compiled a - yet missing - maintenance managementmodel that encompasses the maintenance specialties of the industry, as well as the professional heritage andthe latest scientific accomplishments in the discipline of maintenance.The model is based on the widely accepted quality focused maintenance approach, that is supplemented by theAuthor with four new aspects - 1 reliability-focused culture, 2 quality management system, 3 employment ofexternal service provides, 4 maintenance characteristics specific to printing machinery - determining their effectsand integrating them into one single system.In order to construct the model, the Author develops specific solutions that can be seen as own scientific achievementson the specification of maintenance characteristics of printing machinery; on the efficiency improving applicationsof quality management systems, modern knowledge management and reliability focused corporate culture;and on the implementation of a maintenance information system.

  19. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  20. A condition-based maintenance of a dependent degradation-threshold-shock model in a system with multiple degradation processes

    International Nuclear Information System (INIS)

    Caballé, N.C.; Castro, I.T.; Pérez, C.J.; Lanza-Gutiérrez, J.M.

    2015-01-01

    This paper proposes a condition-based maintenance strategy for a system subject to two dependent causes of failure: degradation and sudden shocks. The internal degradation is reflected by the presence of multiple degradation processes in the system. Degradation processes start at random times following a Non-homogeneous Poisson process and their growths are modelled by using a gamma process. When the deterioration level of a degradation process exceeds a predetermined value, we assume that a degradation failure occurs. Furthermore, the system is subject to sudden shocks that arrive at the system following a Doubly Stochastic Poisson Process. A sudden shock provokes the total breakdown of the system. Thus, the state of the system is evaluated at inspection times and different maintenance tasks can be carried out. If the system is still working at an inspection time, a preventive maintenance task is performed if the deterioration level of a degradation process exceeds a certain threshold. A corrective maintenance task is performed if the system is down at an inspection time. A preventive (corrective) maintenance task implies the replacement of the system by a new one. Under this maintenance strategy, the expected cost rate function is obtained. A numerical example illustrates the analytical results. - Highlights: • A condition-based maintenance model is proposed. • Two dependent causes of failure are considered: deterioration and external shocks. • Deterioration is given by multiple degradation processes growing by a gamma process. • The initiation of degradation processes follows a Non-homogeneous Poisson process. • External shocks arrive at the system by using a Doubly Stochastic Poisson Process

  1. Ethnicity- and sex-based discrimination and the maintenance of self-esteem.

    Science.gov (United States)

    Lönnqvist, Jan-Erik; Hennig-Schmidt, Heike; Walkowitz, Gari

    2015-01-01

    The psychological underpinnings of labor market discrimination were investigated by having participants from Israel, the West Bank and Germany (N = 205) act as employers in a stylized employment task in which they ranked, set wages, and imposed a minimum effort level on applicants. State self-esteem was measured before and after the employment task, in which applicant ethnicity and sex were salient. The applicants were real people and all behavior was monetarily incentivized. Supporting the full self-esteem hypothesis of the social identity approach, low self-esteem in women was associated with assigning higher wages to women than to men, and such behavior was related to the maintenance of self-esteem. The narrower hypothesis that successful intergroup discrimination serves to protect self-esteem received broader support. Across all participants, both ethnicity- and sex-based discrimination of out-groups were associated with the maintenance of self-esteem, with the former showing a stronger association than the latter.

  2. Ethnicity- and Sex-Based Discrimination and the Maintenance of Self-Esteem

    Science.gov (United States)

    2015-01-01

    The psychological underpinnings of labor market discrimination were investigated by having participants from Israel, the West Bank and Germany (N = 205) act as employers in a stylized employment task in which they ranked, set wages, and imposed a minimum effort level on applicants. State self-esteem was measured before and after the employment task, in which applicant ethnicity and sex were salient. The applicants were real people and all behavior was monetarily incentivized. Supporting the full self-esteem hypothesis of the social identity approach, low self-esteem in women was associated with assigning higher wages to women than to men, and such behavior was related to the maintenance of self-esteem. The narrower hypothesis that successful intergroup discrimination serves to protect self-esteem received broader support. Across all participants, both ethnicity- and sex-based discrimination of out-groups were associated with the maintenance of self-esteem, with the former showing a stronger association than the latter. PMID:25978646

  3. A model for determining condition-based maintenance policies for deteriorating multi-component systems

    NARCIS (Netherlands)

    Hontelez, J.A.M.; Wijnmalen, D.J.D.

    1993-01-01

    We discuss a method to determine strategies for preventive maintenance of systems consisting of gradually deteriorating components. A model has been developed to compute not only the range of conditions inducing a repair action, but also inspection moments based on the last known condition value so

  4. Heuristic guidelines and experimental evaluation of effective augmented-reality based instructions for maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Seong, Poong Hyun

    2010-01-01

    Research highlights: → Augmented reality (AR) instructions were built for NPPs maintenance personnel. → 4-5 pieces of information at a time were optimum for AR instructions in this study. → A large variance in mode no. 5 implies these were also found to be critical amount. → Heuristic guidelines were suggested to make AR instructions more effective. - Abstract: As industrial plants and factories age, their maintenance requirements increase. Because maintenance mistakes directly increase the operating costs of a power plant, maintenance quality is significant concern to plant management. By law, all personnel working with nuclear technology must be re-trained every three years in Korea; however, as the statistical data show, the number of shutdown accidents at nuclear power plants (NPPs) due to maintenance failure is still high and needs to be reduced. Industries have started to adopt various technologies to increase the speed and accuracy of maintenance. Among those technologies, augmented reality (AR) is the latest multimedia presentation technology to be applied to plant maintenance, and it offers superior intuitiveness and user interactivity over other conventional multimedia. This empirical study aims to measure the optimum amounts of information to be delivered at a time and to identify what types of information enhance the learning ability of novices and to suggest heuristic guidelines by which to make effective AR training instructions. In the first experiment, the optimum amount of information in an AR learning environment for novices was found to be 4-5 pieces of information in a chunk by comparing results between a pre-test and an after-test. This result implies that intentionally made chunks help novices learn more effectively. In the second experiment, the AR training instruction based on the suggested heuristic guidelines was slightly more effective than other AR training instructions. Maintenance in nuclear power plants can be more reliable

  5. The role of the restructured Mobile Remote Service Base System (MBS) in support of Space Station maintenance and servicing

    Science.gov (United States)

    Darlington, T.; Krukewich, K.

    1992-08-01

    The critical parameters resulting from the restructuring of Space Station Freedom which necessitated the redesign of the Mobile Remote Service Base System (MBS) are described. These include optimization of robotic attachment locations for access to the Space Station truss-mounted orbital replacement units, transport of logistics carriers to the maintenance sites, minimization of EVA overhead associated with maintenance, self-maintenance of other mobile servicing system (MSS) elements on the MBS, and balancing of station EVA and extravehicular robotics in a complementary fashion to minimize maintenance overhead in general. Consideration is given to the configuration of the resulting MBS, which provides the program with maximum flexibility to utilize the assets of the MSS and optimizes end-to-end maintenance with regard to the use of station resources such as crew time and power. Maintenance and servicing scenarios which are instrumental to the reconfigured MBS as well as the results of improved maintenance capability are presented.

  6. The development of web based power plant maintenance management system

    International Nuclear Information System (INIS)

    Kim, Bum Shin; Kim, Eui Hyun; Jang, Dong Sik; Cho, Jae Min; Chae, Gil Seok; Jung, Gyu Chol

    2004-01-01

    Most power plants have operated many independent computerize systems for maintenance. Independence of systems have caused complexity of business process and inconvenience of computer system management. Because the equipment and material master data is not standardize and structurize, it is difficult to manage equipment maintenance history and material delivery. Especially equipment classification criterion is important for standardization of every maintenance information. It is necessary to integrate function of independent systems for business process simplification and rapid work flow. This paper provides equipment classification criterion design and system integration method with the case of live system development

  7. Methods and tools in development in the field of maintenance; Methodes et outils pour la maintenance en cours de developpement

    Energy Technology Data Exchange (ETDEWEB)

    Le Reverend, D.; Tortolano, M. [Electricite de France (EDF/RD), 78 - Chatou (France); Leniaud, F. [Electricite de France (EDF), Div. Production Nuleaire, 93 - Saint-Denis (France)

    2004-07-01

    This article is dedicated to the maintenance strategy followed by EDF for its nuclear power plants. This strategy is based on the American method RCM (reliability centered method) that has been extended to passive components such as structures and relies on 4 axis. The first axis can be defined as the optimization of maintenance with regard to safety, outage and costs. The aim is to set the border between preventive maintenance and remedial maintenance. The second axis is the condition based maintenance that is the maintenance action that is triggered by the real state of the equipment. This type of maintenance implies the search for reliable and accurate diagnostics. The third axis is the design of simulation and planning tools required for the management of the moving of tools, machinery and spare-parts on a maintenance work site. The fourth axis is the design of tools able to repair some important equipment, this way may be a valid alternative to the replacement of equipment in terms of cost and outage time. (A.C.)

  8. Explaining variations in state foster care maintenance rates and the implications for implementing new evidence-based programs

    Science.gov (United States)

    Goldhaber-Fiebert, Jeremy D.; Babiarz, Kimberly S.; Garfield, Rachel L.; Wulczyn, Fred; Landsverk, John; Horwitz, Sarah M.

    2013-01-01

    Background U.S. Child Welfare systems are involved in the lives of millions of children, and total spending exceeds $26 billion annually. Out-of-home foster care is a critical and expensive Child Welfare service, a major component of which is the maintenance rate paid to support housing and caring for a foster child. Maintenance rates vary widely across states and over time, but reasons for this variation are not well understood. As evidence-based programs are disseminated to state Child Welfare systems, it is important to understand what may be the important drivers in the uptake of these practices including state spending on core system areas. Data and methods We assembled a unique, longitudinal, state-level panel dataset (1990–2008) for all 50 states with annual data on foster care maintenance rates and measures of child population in need, poverty, employment, urbanicity, proportion minority, political party control of the state legislature and governorship, federal funding, and lawsuits involving state foster care systems. All monetary values were expressed in per-capita terms and inflation adjusted to 2008 dollars. We used longitudinal panel regressions with robust standard errors and state and year fixed effects to estimate the relationship between state foster care maintenance rates and the other factors in our dataset, lagging all factors by one year to mitigate the possibility that maintenance rates influenced their predictors. Exploratory analyses related maintenance rates to Child Welfare outcomes. Findings State foster care maintenance rates have increased in nominal terms, but in many states, have not kept pace with inflation, leading to lower real rates in 2008 compared to those in 1991 for 54% of states for 2 year-olds, 58% for 9 year-olds, and 65% for 16 year-olds. In multivariate analyses including socioeconomic, demographic, and political factors, monthly foster care maintenance rates declined $15 for each 1% increase in state unemployment and

  9. Buildings Lean Maintenance Implementation Model

    Science.gov (United States)

    Abreu, Antonio; Calado, João; Requeijo, José

    2016-11-01

    Nowadays, companies in global markets have to achieve high levels of performance and competitiveness to stay "alive".Within this assumption, the building maintenance cannot be done in a casual and improvised way due to the costs related. Starting with some discussion about lean management and building maintenance, this paper introduces a model to support the Lean Building Maintenance (LBM) approach. Finally based on a real case study from a Portuguese company, the benefits, challenges and difficulties are presented and discussed.

  10. Optimisation of test and maintenance based on probabilistic methods

    International Nuclear Information System (INIS)

    Cepin, M.

    2001-01-01

    This paper presents a method, which based on models and results of probabilistic safety assessment, minimises the nuclear power plant risk by optimisation of arrangement of safety equipment outages. The test and maintenance activities of the safety equipment are timely arranged, so the classical static fault tree models are extended with the time requirements to be capable to model real plant states. A house event matrix is used, which enables modelling of the equipment arrangements through the discrete points of time. The result of the method is determination of such configuration of equipment outages, which result in the minimal risk. Minimal risk is represented by system unavailability. (authors)

  11. Using Field Data for Energy Efficiency Based on Maintenance and Operational Optimisation. A Step towards PHM in Process Plants

    Directory of Open Access Journals (Sweden)

    Micaela Demichela

    2018-03-01

    Full Text Available Energy saving is an important issue for any industrial sector; in particular, for the process industry, it can help to minimize both energy costs and environmental impact. Maintenance optimization and operational procedures can offer margins to increase energy efficiency in process plants, even if they are seldom explicitly taken into account in the predictive models guiding the energy saving policies. To ensure that the plant achieves the desired performance, maintenance operations and maintenance results should be monitored, and the connection between the inputs and the outcomes of the maintenance process, in terms of total contribution to manufacturing performance, should be explicit. In this study, a model for the energy efficiency analysis was developed, based on cost and benefits balance. It is aimed at supporting the decision making in terms of technical and operational solutions for energy efficiency, through the optimization of maintenance interventions and operational procedures. A case study is here described: the effects on energy efficiency of technical and operational optimization measures for bituminous materials production process equipment. The idea of the Conservation Supply Curve (CSC was used to capture both the cost effectiveness of the measures and the energy efficiency effectiveness. The optimization was thus based on the energy consumption data registered on-site: data collection and modelling of the relevant data were used as a base to implement a prognostic and health management (PHM policy in the company. Based on the results from the analysis, efficiency measures for the industrial case study were proposed, also in relation to maintenance optimization and operating procedures. In the end, the impacts of the implementation of energy saving measures on the performance of the system, in terms of technical and economic feasibility, were demonstrated. The results showed that maintenance optimization could help in reaching

  12. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  13. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  14. Condition-based maintenance. With application on a heat exchanger and a pump; Tillstaandsbaserat underhaall. Med applikation paa en vaermevaexlare och en pump

    Energy Technology Data Exchange (ETDEWEB)

    Raaberg, Martin; Slaetteke, Ola

    2012-02-15

    Regular maintenance is required to extend the life of a plant's components and maintain optimum operation. Unnecessary outages from maintenance may inflict large monetary losses. Therefore, a cost-effective maintenance system should be condition-based rather than time-based. The optimal maintenance scheme requires a process model and a forecast of the operation conditions of this model. At least one of the model parameters should be affected by the maintenance. To determine the actual status of the plant, the model parameters should be estimated. This requires an analysis of available data to detect degradation of the critical components performance. Base load plants usually operate at maximum production or as close to maximum as possible at stabile conditions during long periods. Since the operating time is long and usually at high load in base load plants, advanced control systems and maintenance planning is most profitable in such plants. Advanced control and process optimization requires dynamic process models. Due to the long operating time of a base load plant, it is natural that its process characteristics change, such as wear and fouling. This means that models must be adapted continuously in order to generate a good approximation and thus a good basis for control and optimization. The problem is that the stable operation condition of a base load plant prevents a good estimate of model parameters through the lack of excitation of the process

  15. Avaliação do ganho funcional do cotovelo com a cirurgia de Steindler na lesão do plexo braquial Evaluation of functional gain of the elbow following Steindler surgery for brachial plexus injury

    Directory of Open Access Journals (Sweden)

    Marcelo Rosa de Rezende

    2011-01-01

    Full Text Available OBJETIVO: Avaliar ganho de força e amplitude de movimento do cotovelo após cirurgia de Steindler Modificada em pacientes com lesão do tronco superior do plexo braquial. MÉTODO: Foram acompanhados de 1998 a 2007 onze pacientes com lesão traumática fechada do tronco superior do plexo braquial. Todos apresentavam evolução de pelo menos 1 ano da lesão e grau de força de flexão do cotovelo que variou de M1 a M3. Os pacientes foram submetidos à cirurgia de Steindler modificada e seguidos por período mínimo de 6 meses. Realizadas avaliações pré e pós-operatórias do ganho de força muscular, amplitude de movimento do cotovelo e pontuação conforme escala DASH. RESULTADOS: Dos onze pacientes analisados, nove (82% atingiram nível de força igual ou maior a M3 (MRC. Dois (18% chegaram ao nível de força M2(MRC. Observamos que os pacientes apresentaram ganho médio de amplitude de movimento do cotovelo pós-operatória de 43,45 graus. A média de flexão do cotovelo pós-operatória foi de 88 graus. Houve melhora da função do cotovelo demonstrada na Escala DASH em 81% dos pacientes do estudo. CONCLUSÃO: A cirurgia de Steindler Modificada mostrou-se eficaz no tratamento dos pacientes com lesão de tronco superior de plexo braquial, com ganho estatisticamente significativo de amplitude de movimento. Em todos os casos algum grau de ganho de força e amplitude de flexão do cotovelo, sendo tanto maior quanto maior a força muscular inicial. Nível de Evidência: Nível II, ensaio clínico prospective.OBJECTIVE: To evaluate the gain in strength and range of motion after modified Steindler surgery of the elbow in patients with lesions of the upper trunk of the brachial plexus. METHOD: From 1998 to 2007, eleven patients with traumatic closed upper trunk lesion of the brachial plexus were studied. All the patients had development of at least 1 year of injury and degree of strength of elbow flexion ranging from M1 to M3. The patients

  16. Fault Diagnosis approach based on a model-based reasoner and a functional designer for a wind turbine. An approach towards self-maintenance

    Science.gov (United States)

    Echavarria, E.; Tomiyama, T.; van Bussel, G. J. W.

    2007-07-01

    The objective of this on-going research is to develop a design methodology to increase the availability for offshore wind farms, by means of an intelligent maintenance system capable of responding to faults by reconfiguring the system or subsystems, without increasing service visits, complexity, or costs. The idea is to make use of the existing functional redundancies within the system and sub-systems to keep the wind turbine operational, even at a reduced capacity if necessary. Re-configuration is intended to be a built-in capability to be used as a repair strategy, based on these existing functionalities provided by the components. The possible solutions can range from using information from adjacent wind turbines, such as wind speed and direction, to setting up different operational modes, for instance re-wiring, re-connecting, changing parameters or control strategy. The methodology described in this paper is based on qualitative physics and consists of a fault diagnosis system based on a model-based reasoner (MBR), and on a functional redundancy designer (FRD). Both design tools make use of a function-behaviour-state (FBS) model. A design methodology based on the re-configuration concept to achieve self-maintained wind turbines is an interesting and promising approach to reduce stoppage rate, failure events, maintenance visits, and to maintain energy output possibly at reduced rate until the next scheduled maintenance.

  17. Fault Diagnosis approach based on a model-based reasoner and a functional designer for a wind turbine. An approach towards self-maintenance

    International Nuclear Information System (INIS)

    Echavarria, E; Tomiyama, T; Bussel, G J W van

    2007-01-01

    The objective of this on-going research is to develop a design methodology to increase the availability for offshore wind farms, by means of an intelligent maintenance system capable of responding to faults by reconfiguring the system or subsystems, without increasing service visits, complexity, or costs. The idea is to make use of the existing functional redundancies within the system and sub-systems to keep the wind turbine operational, even at a reduced capacity if necessary. Re-configuration is intended to be a built-in capability to be used as a repair strategy, based on these existing functionalities provided by the components. The possible solutions can range from using information from adjacent wind turbines, such as wind speed and direction, to setting up different operational modes, for instance re-wiring, re-connecting, changing parameters or control strategy. The methodology described in this paper is based on qualitative physics and consists of a fault diagnosis system based on a model-based reasoner (MBR), and on a functional redundancy designer (FRD). Both design tools make use of a function-behaviour-state (FBS) model. A design methodology based on the re-configuration concept to achieve self-maintained wind turbines is an interesting and promising approach to reduce stoppage rate, failure events, maintenance visits, and to maintain energy output possibly at reduced rate until the next scheduled maintenance

  18. Costs of performance based maintenance for local roads: Case study Albania

    OpenAIRE

    Jokanović Igor; Grujić Bojana; Zeljić Dragana; Grujić Žarko; Svilar Mila

    2017-01-01

    The provision and maintenance of road infrastructure is a major global business, consequently it is essential that road maintenance services are provided in the most cost effective manner. Without regular maintenance, roads can rapidly fall into disrepair, preventing realization of the longer term impacts of road improvements on development, such as increased agricultural production and growth in school enrollment, which is of particular importance for a network of local (access) roads. Inade...

  19. Residual life management. Maintenance improvement

    International Nuclear Information System (INIS)

    Sainero Garcia, J.; Hevia Ruperez, F.

    1995-01-01

    The terms Residual Life Management, Life Cycle Management and Long-Term Management are synonymous with a concept which aims to establish efficient maintenance for the profitable and safe operation of a power plant for as long as possible. A Residual Life Management programme comprises a number of stages, of which Maintenance Evaluation focuses on how power plant maintenance practices allow the mitigation and control of component ageing. with this objective in mind, a methodology has been developed for the analysis of potential degradative phenomena acting on critical components in terms of normal power plant maintenance practices. This methodology applied to maintenance evaluation enables the setting out of a maintenance programme based on the Life Management concept, and the programme's subsequent up-dating to allow for new techniques and methods. Initial applications have shown that although, in general terms, power plant maintenance is efficient, the way in which Residual Life Management is approached requires changes in maintenance practices. These changes range from modifications to existing inspection and surveillance methods or the establishment of new ones, to the monitoring of trends or the performance of additional studies, the purpose of which is to provide an accurate evaluation of the condition of the installations and the possibility of life extension. (Author)

  20. An improved segmentation-based HMM learning method for Condition-based Maintenance

    International Nuclear Information System (INIS)

    Liu, T; Lemeire, J; Cartella, F; Meganck, S

    2012-01-01

    In the domain of condition-based maintenance (CBM), persistence of machine states is a valid assumption. Based on this assumption, we present an improved Hidden Markov Model (HMM) learning algorithm for the assessment of equipment states. By a good estimation of initial parameters, more accurate learning can be achieved than by regular HMM learning methods which start with randomly chosen initial parameters. It is also better in avoiding getting trapped in local maxima. The data is segmented with a change-point analysis method which uses a combination of cumulative sum charts (CUSUM) and bootstrapping techniques. The method determines a confidence level that a state change happens. After the data is segmented, in order to label and combine the segments corresponding to the same states, a clustering technique is used based on a low-pass filter or root mean square (RMS) values of the features. The segments with their labelled hidden state are taken as 'evidence' to estimate the parameters of an HMM. Then, the estimated parameters are served as initial parameters for the traditional Baum-Welch (BW) learning algorithms, which are used to improve the parameters and train the model. Experiments on simulated and real data demonstrate that both performance and convergence speed is improved.

  1. Avaliação do crescimento de tecidos e órgãos de novilhos mestiços Holandês-Gir durante o ganho compensatório. 2. Tecidos e órgãos Evaluation of growth of tissues and organs of crossbreed Holstein-Gyr steers during compensatory growth. 2. Tissues and organs

    Directory of Open Access Journals (Sweden)

    Maria Izabel Vieira de Almeida

    2001-04-01

    Full Text Available O objetivo deste trabalho foi analisar os efeitos da restrição alimentar anterior ao confinamento sobre o crescimento e a composição química de tecidos e órgãos corporais em bovinos. Foram utilizados 24 novilhos mestiços Holandês-Gir com idade de 19,3±5,1 meses e peso vivo de 202,1±49,1 kg, ao início do experimento. Quinze animais foram confinados após um período de restrição de pasto (grupo ganho compensatório, enquanto nove deles tiveram livre acesso ao pasto (grupo ganho contínuo. Foram abatidos três animais de cada grupo, no início, aos 28 e 112 dias do confinamento e, aos 56 e 84 dias de confinamento, foram abatidos três animais do grupo de ganho compensatório. Durante o confinamento, os animais do grupo de ganho compensatório e do grupo de ganho contínuo receberam alimentação ad libitum, composta por silagem de milho e 26% de concentrado, na matéria seca. As taxas de crescimento relativo foram avaliadas por meio de equações alométricas. As taxas de deposição de proteína, gordura e energia na carcaça, em relação ao ganho de peso de corpo vazio (PCVZ, não diferiram entre os tratamentos. A deposição de proteína nos órgãos, em relação ao aumento do PCVZ, foi mais elevada nos animais do grupo ganho compensatório do que nos animais de ganho contínuo, tendo os valores mais elevados sido observados em todas as partes corporais. O crescimento dos músculos Biceps femoris e Tensor fascia latea, o peso e os teores de proteína, cálcio e fósforo do fêmur e da oitava costela não foram afetados pela restrição alimentar anterior ao confinamento.The research aimed to analyze the effects of feed restriction prior to the confinement on growth and chemical composition of the tissues and organs in cattle. Twenty-four Holstein-Gyr crossbred steers, with 19,3 ± 5,1 months of age and 202,1 ± 49,1 kg LW, at beginning of the trial were used. Fifteen of the animals were confined after a 104-day period of forage

  2. No functional role of attention-based rehearsal in maintenance of spatial working memory representations

    NARCIS (Netherlands)

    Belopolsky, A.V.; Theeuwes, J.

    2009-01-01

    The present study systematically examined the role of attention in maintenance of spatial representations in working memory as proposed by the attention-based rehearsal hypothesis [Awh, E., Jonides, J., & Reuter-Lorenz, P. A. (1998). Rehearsal in spatial working memory. Journal of Experimental

  3. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  4. The use of probabilistic safety assessment (PSA) based maintenance indicators to increase the availability of safety related systems in nuclear power plants

    International Nuclear Information System (INIS)

    Kirchsteiger, C.

    1991-04-01

    This work describes the theoretical development of a Probabilistic Safety Assessment (PSA) based Performance Indicator (PI) model for a comprehensive Maintenance Efficiency Analysis (MEA) and its practical application to past operational history data of a certain nuclear power plant. Plant specific equipment history and maintenance work on data have been collected and analysed using various advanced statistical procedures (nonparametric methods, multivariate analysis in order to be able to estimate safety system related equipment and maintenance process trends. The main results of such a MEA case study are the trends in the (in)effectiveness of the performance of a selected safety system and its dominant components as well as the detection of the dominant maintenance related causes of its bad (good) equipment performance. Finally, the therefrom gained results are used to propose a new set of safety system-based and maintenance-related performance indicators, including suggestions for a corresponding plant specific maintenance data collection system. (author)

  5. The dynamic pressure measurements of the nuclear reactor coolant for condition-based maintenance of the reactor

    International Nuclear Information System (INIS)

    Es-Saheb, M.H.H.

    1990-01-01

    The condition-based maintenance of the nuclear reactor, by monitoring and measuring the instantaneous dynamic pressure distribution of the coolant (water) impact on the solid surfaces of the reactor during operation is presented. The behaviour of water domes (jets) produced by underwater explosions of small changes of P.E.T.N. at various depths in two different size cylindrical containers, which simulate the nuclear reactor, is investigated. Water surface domes (jets) from the underwater explosions are photographed. Depending on the depth of the charge, curved and flat top jets of up to 455 mm diameter and impact speeds of up to 70 m/sec. are observed. The instabilities in the dome surfaces are observed and the instantaneous profiles are analysed. It is found that, in all cases tested, the maximum pressure takes place at the center of the jet and could reach up to 3.0 times the on-dimensional impact pressure value. The use of their measurements, as online monitoring for condition-based maintenance and design-out maintenance is discussed. 18 refs

  6. The effect of maintenance policy violations

    NARCIS (Netherlands)

    Rijsdijk, Christiaan; Tinga, Tiedo

    2014-01-01

    Motivation Maintenance policy assessments usually rely on expert judgement. We seek for some history based validation. Organisations may use our inference to assess risks of maintenance policy violations. Approach We depart from the arbitrary viewpoint that decisions have observable effects. We

  7. Multi-level predictive maintenance for multi-component systems

    International Nuclear Information System (INIS)

    Nguyen, Kim-Anh; Do, Phuc; Grall, Antoine

    2015-01-01

    In this paper, a novel predictive maintenance policy with multi-level decision-making is proposed for multi-component system with complex structure. The main idea is to propose a decision-making process considered on two levels: system level and component one. The goal of the decision rules at the system level is to address if preventive maintenance actions are needed regarding the predictive reliability of the system. At component level the decision rules aim at identifying optimally a group of several components to be preventively maintained when preventive maintenance is trigged due to the system level decision. Selecting optimal components is based on a cost-based group improvement factor taking into account the predictive reliability of the components, the economic dependencies as well as the location of the components in the system. Moreover, a cost model is developed to find the optimal maintenance decision variables. A 14-component system is finally introduced to illustrate the use and the performance of the proposed predictive maintenance policy. Different sensitivity analysis are also investigated and discussed. Indeed, the proposed policy provides more flexibility in maintenance decision-making for complex structure systems, hence leading to significant profits in terms of maintenance cost when compared with existing policies. - Highlights: • A predictive maintenance policy for complex structure systems is proposed. • Multi-level decision process based on prognostic results is proposed. • A cost-based group importance measure is introduced for decision-making. • Both positive and negative dependencies between components are investigated. • A cost model and Monte Carlo simulation are developed for optimization process.

  8. Knowledge lost in data : Organizational impediments to condition-based maintenance in the process industry

    NARCIS (Netherlands)

    van de Kerkhof, Roland; Akkermans, Henk; Noorderhaven, Niels; Zijm, H.; Klumpp, M.; Clausen, U.; Ten Hompel, M.

    2016-01-01

    In this chapter we report on a pilot study of Condition-Based Maintenance (CBM) in the process industries, such as the steelmaking- and chemical industries, and propose a diagnostic instrument for systematically analysing the challenges to the successful implementation and execution of a CBM

  9. Airbus A320 NEO Base Maintenance Concept SAS Operations

    OpenAIRE

    Dafgård, Oscar

    2017-01-01

    Detta arbete har utförts tillsammans med SAS, för att undersöka om ett base maintenance koncept med ett intervall på 36 månader skulle vara mer kostnadseffektivt än 24 månader för deras nya Airbus A320 NEO flotta. SAS, precis som alla andra flygbolag utnyttjar sina flygplan på sina egna och specifika vis. Eftersom inga flygbolag opererar på samma sätt kan inte heller underhållet skötas på samma sätt för en specifik flygplanstyp. Underhållsprogrammet behövde därför ses över för att optimeras g...

  10. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  11. Predição de ganho genético com diferentes índices de seleção no milho pipoca CMS-43 Prediction of genetic gain with different selection indexes in popcorn CMS-43

    Directory of Open Access Journals (Sweden)

    Maria José Granate

    2002-07-01

    Full Text Available O melhoramento simultâneo da capacidade de expansão e da produtividade no milho pipoca são dificultados por causa da correlação negativa entre as duas características, mas o uso de índices de seleção permite contornar essa dificuldade. Em 1997/1998 foram avaliadas 166 famílias de meios-irmãos do composto de milho pipoca (Zea mays L. CMS-43, na Embrapa-Centro Nacional de Pesquisa de Milho e Sorgo, em Sete Lagoas, MG, no delineamento em blocos casualizados. Os índices de seleção empregados para predizer os ganhos por seleção foram os de Smith e Hazel, Pesek & Baker, Elston e de Williams. O índice de seleção de Smith e Hazel permitiu a predição de ganhos superiores em maior número de caracteres; com o índice de seleção de Williams não se verificou nenhum dado significativo. O uso de índices de seleção é adequado porque permite a predição de ganhos simultâneos nas duas principais características.Simultaneous breeding for expansion volume and grain yield in popcorn (Zea mays L. is difficult because of negative correlation between these traits. The use of selection indexes allows to overcome this difficulty. In 1997/1998, at Embrapa-Centro Nacional de Pesquisa de Milho e Sorgo, in Sete Lagoas, MG, Brazil,166 half-sib families from CMS-43 popcorn were evaluated, using random blocks design. The selection indexes used were Smith and Hazel, Pesek & Baker, Elston and Williams. The selection index of Smith and Hazel allowed larger predicted gains in more traits, and on the contrary, the prediction using the selection index of Williams was insignificant. The use of selection indexes allows simultaneous prediction of gains in the two main traits.

  12. Operations and maintenance - Safety challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Liv [Oljedirektoratet, Stavanger (Norway)

    1999-07-01

    With the unsteady oil prices and the possible consequences of the deregulation of the European energy markets one may expect further optimization of operating and maintenance costs. One may also expect extended use of various risk-based optimization techniques such as RCM (Reliability Centered Maintenance) and RBI (Risk Based Inspection). This presentation addresses the need for further research and development in this area. Maintenance work is necessary, but it can also create risk. The accident statistics show many examples of this. The Norwegian petroleum industry's ability to learn from previous incidents is questioned. Maintenance staff must be well trained and possess the necessary routines. Technical documentation must be updated. Uncertainties with respect to future oil and gas prices combined with the effect of the deregulation of the European energy markets will lead to even more focus on cost-effective operations and maintenance. The need for long-term research and development is stressed. Risk based techniques such as RCM and RBI are extensively used in the defence industry and the nuclear industry, but applying them to the petroleum industry requires improved risk models. Ageing effects such as corrosion, erosion, fatigue etc. can be expected, but the capability to predict, monitor and control them should be improved. At present, not even the most sophisticated risk analysis can model ageing effects. The importance of efficient use of information technology (IT) is stressed. Improving the product quality and safety often requires new technology and so research and development is important. Close cooperation with the industry is required.

  13. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  14. Understanding and Predicting the Process of Software Maintenance Releases

    Science.gov (United States)

    Basili, Victor; Briand, Lionel; Condon, Steven; Kim, Yong-Mi; Melo, Walcelio L.; Valett, Jon D.

    1996-01-01

    One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.

  15. Augmented reality application utility for aviation maintenance work instruction

    Science.gov (United States)

    Pourcho, John Bryan

    Current aviation maintenance work instructions do not display information effectively enough to prevent costly errors and safety concerns. Aircraft are complex assemblies of highly interrelated components that confound troubleshooting and can make the maintenance procedure difficult (Drury & Gramopadhye, 2001). The sophisticated nature of aircraft maintenance necessitates a revolutionized training intervention for aviation maintenance technicians (United States General Accounting Office, 2003). Quite simply, the paper based job task cards fall short of offering rapid access to technical data and the system or component visualization necessary for working on complex integrated aircraft systems. Possible solutions to this problem include upgraded standards for paper based task cards and the use of integrated 3D product definition used on various mobile platforms (Ropp, Thomas, Lee, Broyles, Lewin, Andreychek, & Nicol, 2013). Previous studies have shown that incorporation of 3D graphics in work instructions allow the user to more efficiently and accurately interpret maintenance information (Jackson & Batstone, 2008). For aircraft maintenance workers, the use of mobile 3D model-based task cards could make current paper task card standards obsolete with their ability to deliver relevant, synchronized information to and from the hangar. Unlike previous versions of 3D model-based definition task cards and paper task cards, which are currently used in the maintenance industry, 3D model based definition task cards have the potential to be more mobile and accessible. Utilizing augmented reality applications on mobile devices to seamlessly deliver 3D product definition on mobile devices could increase the efficiency, accuracy, and reduce the mental workload for technicians when performing maintenance tasks (Macchiarella, 2004). This proposal will serve as a literary review of the aviation maintenance industry, the spatial ability of maintenance technicians, and benefits of

  16. Risk-based evaluation tool for safety-related maintenance involving scaffolding

    International Nuclear Information System (INIS)

    Stevens, C.; Azizi, M.; Massman, M.

    1988-01-01

    The US Nuclear Regulatory Commission (NRC) has expressed a general concern that transient materials in and around safety systems at nuclear power plants represent a seismic safety hazard to the plant, in particular, the uncontrolled use of scaffolding during maintenance activities. Currently, most plants perform a seismic safety analysis for all uses of scaffolding near safety-related equipment to determine appropriate tie-down locations, scaffolding reinforcements, etc. This is both time-consuming and, for the most part, unnecessary. A workable engineering solution based on risk analysis techniques has been developed and is being used at the Palo Verde nuclear generating station (PVNGS)

  17. Maintenance for life management

    International Nuclear Information System (INIS)

    Hevia, F.

    1997-01-01

    Life Management is based on the detection, monitoring and control of long-term degradation that affects individual plant components and important populations. Experience has shown that in many cases current maintenance practices do not attend to ageing directly; instead they deal with the consequences when it is already too late, when good Life Management is no longer practical. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to project against, monitor and mitigate ageing that can affect the safe and profitable operating life of the facility. New regulatory requirements for ageing monitoring and effective maintenance to ensure safety (Maintenance Rule) have made it even more necessary to implement the Maintenance Evaluation Programme to cope with ageing, and to integrate that tasks in both programmes to optimise effort and use of tools. This paper presents a brief description of the objectives and methodologies of these Programmes which has been applied to plants around the world and in Spain at the Garona and Vandellos II plants in Spain as part of the PIE project for developing a Remanent Life Evaluation System for nuclear power plants. (Author)

  18. Condition-Based Maintenance Strategy for Production Systems Generating Environmental Damage

    Directory of Open Access Journals (Sweden)

    L. Tlili

    2015-01-01

    Full Text Available We consider production systems which generate damage to environment as they get older and degrade. The system is submitted to inspections to assess the generated environmental damage. The inspections can be periodic or nonperiodic. In case an inspection reveals that the environmental degradation level has exceeded the critical level U, the system is considered in an advanced deterioration state and will have generated significant environmental damage. A corrective maintenance action is then performed to renew the system and clean the environment and a penalty has to be paid. In order to prevent such an undesirable situation, a lower threshold level L is considered to trigger a preventive maintenance action to bring back the system to a state as good as new at a lower cost and without paying the penalty. Two inspection policies are considered (periodic and nonperiodic. For each one of them, a mathematical model and a numerical procedure are developed to determine simultaneously the preventive maintenance (PM threshold L∗ and the inspection sequence which minimize the average long-run cost per time unit. Numerical calculations are performed to illustrate the proposed maintenance policies and highlight their main characteristics with respect to relevant input parameters.

  19. Efeito da suplementação protéica a pasto sobre consumo de forragens, ganho de peso e condição corporal, em vacas Nelore

    Directory of Open Access Journals (Sweden)

    Ruas José Reinaldo Mendes

    2000-01-01

    Full Text Available O objetivo do presente trabalho foi verificar o efeito da utilização de concentrado protéico, durante a época de verão, sobre consumo de forragem e variação no ganho de peso e no escore da condição corporal após o parto. Foram utilizadas 51 vacas paridas da raça Nelore, distribuídas ao acaso nos seguintes tratamentos: T0 = sem suplementação; T1 = suplementação com 1 kg; e T2 = suplementação com 2 kg de concentrado contendo 40,8% de PB, durante 105 dias. Neste período, foram determinados o escore corporal e o peso. Para determinar o consumo, utilizaram-se o marcador externo óxido de cromo, em dose única diária de 20 g, e o marcador interno FDA indigestível das extrusas, coletadas por meio de fístulas esofágicas. A suplementação não influenciou o consumo de MS de pasto, que ficou em torno de 9,87 kg MS/dia, correspondente a 2,13% do peso vivo, mas o consumo total de MS foi superior nos tratamentos T1 e T2. Escore da condição corporal, ganho de peso diário e peso final das vacas mostraram-se superiores nos animais suplementados em relação aos não-suplementados. Não foi observada diferença entre os pesos das crias ao final do período experimental.

  20. Evaluations of maintenance effectiveness on unavailability and risk

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1993-01-01

    A methodology is presented for quantifying the effectiveness of maintenance on unavailability and on risk. The methodology is based on standard Markov modeling principles. What is new is the application to quantify maintenance effectiveness by explicitly quantifying maintenance benefits as well as maintenance's negative contributions. Maintenance effects are quantified by defining a degraded state for the component in addition to an operational state and a failed state which are usually defined. The maintenance model which is developed is a natural extension of the standard models used in reliability analysis and in Probabilistic Risk Assessments (PRAs). The results which are obtained can be directly used in PRAs. Applications of the methodology are presented by quantifying maintenance effectiveness on component performance and component unavailability for specific maintenance schedules

  1. Using systematic aging assessments to improve effectiveness of plant maintenance programs

    International Nuclear Information System (INIS)

    Watson, P.; Yang, J.X.; Dam, R.F.; Nickerson, J.H.

    2003-01-01

    Nuclear plant equipment aging assessment studies provided by AECL include life assessments, condition assessments or systematic assessments of maintenance. AECL has developed several tools to apply the results of aging assessment studies to improve the effectiveness of actual plant maintenance programs. The Systematic Assessment of Maintenance and the SYSTMS tool generate maintenance tasks for a system. The System Maintenance Datastore tool assesses the maintenance resources on a system basis, and can thus quantify the savings realized by optimizing the maintenance program. Long term trends in condition-based maintenance due to component aging can be predicted, and resource savings due to optimum timing of component replacement or general plant refurbishment can be quantified. The System based Adaptive Maintenance Process ensures the maintenance program is continually updated to reflect the latest plant equipment condition and maintenance strategy information. (author)

  2. Regulatory oversight of maintenance activities at nuclear power plants

    International Nuclear Information System (INIS)

    Pape, M.

    1997-01-01

    Regulation of nuclear safety in the UK is based on monitoring of compliance with licence conditions. This paper discusses legislation aspects, license conditions, license requirements for maintenance and maintenance activities in the UK. It also addresses the regulator utility interaction, the regulatory inspection of maintenance and the trends in maintenance. (author)

  3. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...... and maintenance require knowledge bases which can capture the interactions between the two plant activities. As an example, taking out a component or a subsystem for maintenance during operation will require a knowledge base representing the interactions between plant structure, functions, operating states...... and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural information...

  4. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    a small team of experienced nuclear experts/specialists in the world. It can be requested for a single area or multiple ones, such as a) In-Service Inspection program review and optimization, including inspection qualification and risk informed inspection, b) maintenance program optimization by means of equipment reliability, performance based approach, risk informed on-line maintenance, condition based maintenance, c) outage improvement be means of streamlined integration of technologies and process, work planning and scheduling, plant modifications and configuration control, indicators and operating experience feedback system, safety culture, outsourcing and contract management, and spare parts

  5. An overview of a knowledge based system for preventive maintenance support of nuclear power plants

    International Nuclear Information System (INIS)

    Terano, Takao; Nishiyama, Takuya; Yokoo, Takeshi

    1984-01-01

    In recent years, much interest has been paid to knowledge engineering techniques for new vehicles of advanced information processing. As a practical application in electric power industry, this report discusses a knowledge based system for supporting preventive maintenance of nuclear power plants. To support preventive maintenance tasks, the system must have facilities to reason failures and accidents of the plants, to evaluate their significance, to predict any possible troubles, and to indentify appropriate preventive countermeasures for them. This report describes the overview of the prototype system from a viewpoint of knowledge engineering. The results of the study are as follows: (1) The knowledge base of the prototype system consists of a data-base on plants and a rule-base derived from experts' knowledge. Using the information in the knowledge base, the system diagnoses the plant without real-time interaction with operational plants. (2) Expert's knowledge in the rule-base is represented in the non-procedural declarative forms. These rules are organized in some hierarchical structure so as to be used efficiently and used in conjunction with the corresponding set of plant information in the data-base. (3) The prototype system is incrementally developed with the rapid prototyping techniques, that is, the processes of design, implementation and evaluation are repeated several times. (author)

  6. Modernizing international maintenance obligations in Serbia

    Directory of Open Access Journals (Sweden)

    Bordaš Bernadet

    2013-01-01

    Full Text Available The paper deals with the modernization of private international law of maintenance in Serbia in the light of the two newest international instruments drawn up by the Hague Conference on Private International Law. As Serbia has ratified the Hague Protocol on the Law Applicable to Maintenance Obligations in January 2013 introducing modern rules to the legal system of Serbia, the issue of ratification of the Hague Convention on the International Recovery of Child Support and Other Forms of Family Maintenance has arisen, in order to modernize this aspect of the international maintenance as well. In order to establish a position on the issue, the paper presents and analyzes the essential provisions of the Convention (scope of application, administrative cooperation, recognition and enforcement of decisions, stricto sensu enforcement. Based on the analyses, the concluding remarks offers some elements on the bases of which the competent authorities could form an opinion on the necessity and desirability of the ratification of the Convention.

  7. Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment. Research project

    International Nuclear Information System (INIS)

    Martorell, S.; Serradell, V.; Munoz, A.; Sanchez, A.

    1997-01-01

    Background, objective, scope, detailed working plan and follow-up and final product of the project ''Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment'' are described

  8. Ganho de peso e rendimento de carcaça de cordeiros mestiços Texel e Santa Inês x SRD em sistema de manejo semi intensivo

    OpenAIRE

    Villarroel,Arturo Bernardo Selaive; Lima,Luiz Evanilton Silva; Oliveira,Sônia Maria Pinheiro de; Fernandes,Antônio Amaury Oriá

    2006-01-01

    Com o trabalho teve-se o objetivo de avaliar o ganho de peso e as características de carcaça de cordeiros mestiços oriundos do cruzamento de carneiros da raça lanada Texel e deslanada Santa Inês com ovelhas deslanadas sem padrão racial definido-SRD. Foram avaliados 33 cordeiros de ambos os sexos, sendo 17 cordeiros mestiços Texel x SRD (8 machos inteiros e 7 fêmeas e 16 mestiços Santa Inês x SRD (11 machos inteiros e 5 fêmeas). Os cordeiros foram desmamados em média com 90 dias de idade e 11,...

  9. Technical requirements on knowledge base and instrumentation system for decision making in plant operation and maintenance

    International Nuclear Information System (INIS)

    Kitamura, Masaharu; Yoshikawa, Shinji; Hasegawa, Makoto

    1998-03-01

    A series of technical surveys and studies are described in this report to examine and identify technical requirements to be posed on knowledge base and instrumentation system as the fundamental in high reliability computational decision making in operation and maintenance of nuclear power plants. Monitoring and diagnosis are focused as the important tasks among the operation/maintenance-related tasks. A concrete monitoring and diagnosis system configuration has been proposed consisting of distributed symptom database and of on-demand measurement subsystem. An prototype of the proposed system configuration has been successfully verified. (author)

  10. Cloud Computing for Maintenance Performance Improvement

    OpenAIRE

    Kour, Ravdeep; Karim, Ramin; Parida, Aditya

    2013-01-01

    Cloud Computing is an emerging research area. It can be utilised for acquiring an effective and efficient information logistics. This paper uses cloud-based technology for the establishment of information logistics for railway system which requires information based on data from different data sources (e.g. railway maintenance, railway operation, and railway business data). In order to improve the performance of the maintenance process relevant data from various sources need to be acquired, f...

  11. A INFLUÊNCIA DA TERMOTERAPIA NO GANHO DE FLEXIBILIDADE DOS MÚSCULOS ISQUIOTIBIAIS

    Directory of Open Access Journals (Sweden)

    José Herivelton Cardoso de Andrade Filho

    Full Text Available RESUMO Introdução: A flexibilidade muscular é descrita como a capacidade do músculo realizar a extensão de suas fibras, influenciando a mobilidade articular. A diatermia aplicada à musculatura prepara o corpo para atividades físicas, por acelerar o metabolismo das fibras musculares e diminuir a resistência intramuscular, aumentando assim a variedade de movimento e a eficiência mecânica. A crioterapia tem diversas funções fisiológicas quando aplicada ao corpo humano, as quais, em conjunto, propiciam o relaxamento muscular. Objetivo: Avaliar o comportamento da flexibilidade dos músculos isquiotibiais frente à aplicação de alongamento passivo associado a termoterapias quente e fria. Métodos: Este estudo foi composto de 24 voluntários, de ambos os sexos, distribuídos aleatoriamente em três grupos, sendo eles: grupo alongamento passivo (G1, grupo crioterapia precedendo alongamento passivo (G2 e grupo diatermia precedendo alongamento passivo (G3. Os voluntários foram submetidos a avaliações de amplitude de movimento através da goniometria da flexão de quadril com o joelho estendido, sendo uma avaliação inicial realizada antes de iniciar o protocolo e reavaliações ao final de cada uma das quatro semanas de intervenção. Resultados: Verificou-se aumento significativo da flexão de quadril no G2 e G3 com relação ao G1. Não houve diferença estatística entre G2 e G3. Conclusão: O uso da diatermia, assim como da crioterapia, associado ao alongamento passivo é favorável para o ganho de flexibilidade muscular e, consequentemente, de amplitude de movimento em jovens saudáveis.

  12. Machinery prognostics and prognosis oriented maintenance management

    CERN Document Server

    Yan, Jihong

    2014-01-01

    This book gives a complete presentatin of the basic essentials of machinery prognostics and prognosis oriented maintenance management, and takes a look at the cutting-edge discipline of intelligent failure prognosis technologies for condition-based maintenance.  Latest research results and application methods are introduced for signal processing, reliability moelling, deterioration evaluation, residual life prediction and maintenance-optimization as well as applications of these methods.

  13. Prediction of Combine Economic Life Based on Repair and Maintenance Costs Model

    Directory of Open Access Journals (Sweden)

    A Rohani

    2014-09-01

    Full Text Available Farm machinery managers often need to make complex economic decisions on machinery replacement. Repair and maintenance costs can have significant impacts on this economic decision. The farm manager must be able to predict farm machinery repair and maintenance costs. This study aimed to identify a regression model that can adequately represent the repair and maintenance costs in terms of machine age in cumulative hours of use. The regression model has the ability to predict the repair and maintenance costs for longer time periods. Therefore, it can be used for the estimation of the economic life. The study was conducted using field data collected from 11 John-Deer 955 combine harvesters used in several western provinces of Iran. It was found that power model has a better performance for the prediction of combine repair and maintenance costs. The results showed that the optimum replacement age of John-Deer 955 combine was 54300 cumulative hours.

  14. Regulatory requirements related to risk-based inspection and maintenance

    International Nuclear Information System (INIS)

    Schroeder, H.C.; Kauer, R.

    2003-01-01

    By asking the question why new inspection and maintenance strategies have to be developed one can often be made aware that there is always a continue demand for cost reduction and optimisation. In this framework, general trends involving staff reduction, outsourcing, benchmarking etc. can often be observed nearly everywhere. Since inspection and maintenance are amongst the few cost factors, which could be actively influenced in the short term, and in combination with the recent regulatory fundamental changes (e.g. PED) yielding to considerably greater responsibilities for the operator of a plant, also the demand for documentation and comprehensibility of measures will increase. (orig.)

  15. Model-based fault diagnosis framework for effective predictive maintenance / B.B. Akindele

    OpenAIRE

    Akindele, Babatunde Babajide

    2010-01-01

    Predictive maintenance is a proactive maintenance strategy that is aimed at preventing the unexpected failure of equipment through condition monitoring of the health and performance of the equipment. Incessant equipment outage resulting in low availability of production facilities is a major issue in the Nigerian manufacturing environment. Improving equipment availability in Nigeria industry through institution of a full featured predictive maintenance has been suggested by many authors. T...

  16. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter

    2015-01-01

    costs including costs due to lost electricity production are minimized. The risk-based approach is compared with an approach where only boats are used and another approach where the target is to minimize the downtime of the device. This article presents a dynamic approach for total operation......Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs....... Furthermore, a helicopter and boats can be used to transport equipment and personnel to the device, or the whole device can be towed to a harbour for operation and maintenance actions. This article describes, among others, a risk-based inspection and maintenance planning approach where the overall repair...

  17. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  18. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  19. Developing optimized prioritizing road maintenance

    Directory of Open Access Journals (Sweden)

    Ewadh Hussein Ali

    2018-01-01

    Full Text Available Increased demand for efficient maintenance of the existing roadway system needs optimal usage of the allocated funds. The paper demonstrates optimized methods for prioritizing maintenance implementation projects. A selected zone of roadway system in Kerbala city represents the study area to demonstrate the application of the developed prioritization process. Paver system PAVER integrated with GIS is used to estimate and display the pavement condition index PCI, thereby to establish a priority of maintenance. In addition to simple ranking method by PCI produced by the output of PAVER, the paper introduces PCI measure for each section of roadway. The paper introduces ranking by multiple measures investigated through expert knowledge about measures that affect prioritization and their irrespective weights due to a predesigned questionnaire. The maintenance priority index (MPI is related to cost of suitable proposed maintenance, easiness of proposed maintenance, average daily traffic and functional classification of the roadway in addition to PCI. Further, incremental benefit-cost analysis ranking provide an optimized process due to benefit and cost of maintenance. The paper introduces efficient display of layout and ranking for the selected zone of roadway system based on MPI index and incremental BCR method. Although the two developed methods introduce different layout display for priority, statistical test shows that no significant difference between ranking of all methods of prioritization.

  20. Reliability-based optimization of maintenance scheduling of mechanical components under fatigue

    Science.gov (United States)

    Beaurepaire, P.; Valdebenito, M.A.; Schuëller, G.I.; Jensen, H.A.

    2012-01-01

    This study presents the optimization of the maintenance scheduling of mechanical components under fatigue loading. The cracks of damaged structures may be detected during non-destructive inspection and subsequently repaired. Fatigue crack initiation and growth show inherent variability, and as well the outcome of inspection activities. The problem is addressed under the framework of reliability based optimization. The initiation and propagation of fatigue cracks are efficiently modeled using cohesive zone elements. The applicability of the method is demonstrated by a numerical example, which involves a plate with two holes subject to alternating stress. PMID:23564979

  1. A Costing Analysis for Decision Making Grid Model in Failure-Based Maintenance

    OpenAIRE

    M. A., Burhanuddin; Halawani, Sami M.; Ahmad, A. R.

    2011-01-01

    Background. In current economic downturn, industries have to set good control on production cost, to maintain their profit margin. Maintenance department as an imperative unit in industries should attain all maintenance data, process information instantaneously, and subsequently transform it into a useful decision. Then act on the alternative to reduce production cost. Decision Making Grid model is used to identify strategies for maintenance decision. However, the model has limitation as it c...

  2. Desempenho reprodutivo de ovelhas mestiças da raça Santa Inês em Brachiaria humidícula e efeito do sexo no ganho de peso de cordeiros

    Directory of Open Access Journals (Sweden)

    P.A. Oliveira

    2014-02-01

    Full Text Available Objetivou-se avaliar o desempenho reprodutivo de ovelhas deslanadas em função do manejo alimentar das crias e idade de desmame, além de mensurar o efeito do sexo no ganho de peso de cordeiros. Sessenta e quatro ovelhas mestiças da raça Santa Inês foram distribuídas em delineamento inteiramente ao acaso, em esquema fatorial 4 x 2 x 2 - quatro idades de desmame (56, 70, 84 e 98 dias, sexo e manejo alimentar das crias, cada tratamento com quatro repetições. As ovelhas foram manejadas com a cria ao pé, em 14 piquetes de 1,5 ou 2,0 hectares, formados com pastagem de Brachiaria humidícola. As crias nascidas de partos simples, filhos de reprodutores Santa Inês puros de origem (PO. Após o desmame de todos os grupos, sessenta e quatro cordeiros (32 machos e 32 fêmeas foram distribuídos ao acaso em baias individuais e confinados por 30 dias. A comparação dos parâmetros foi realizada pelo ajuste do modelo de regressão linear simples. Verificou-se vício de tempo longo do manejo alimentar das crias de + 3,7% (P<0,05 para o intervalo entre partos e de + 1,4% (P<0,05 para o período de serviço. Houve efeito linear crescente (P<0,05 da idade de desmame sobre o intervalo entre partos e período de serviço. Verificou-se vício de tempo longo do sexo das crias de + 2,0% (P<0,05 para o intervalo entre partos e de + 0,8% (P<0,05 para o período de serviço das ovelhas. Constatou-se vício de tempo longo do sexo de + 35,2% e + 36,9% (P<0,05, respectivamente, para o ganho de peso diário de cordeiros do nascimento ao desmame e pós desmame em confinamento. A suplementação das crias em alimentador privativo e a antecipação da idade de desmame reduzem o intervalo entre partos e período de serviço de ovelhas deslanadas em pastagem de Brachiaria humidícula. O sexo da cria é fonte de variação na análise da eficiência reprodutiva de matrizes ovinas e no ganho de peso de cordeiros mestiços da raça Santa Inês do nascimento ao desmame e ap

  3. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  4. EFEITO DO USO DE AUTOLIZADO DE CERVEJA NO GANHO DE PESO DE BEZERROS DA RAÇA GIR INFLUENCE OF UTILIZED BEER YEAST IN WEIGHT INCREASE OF GIR CALVES

    Directory of Open Access Journals (Sweden)

    Roulien Fontes

    2007-09-01

    Full Text Available

    O presente trabalho trata do estudo da influência da ingestão do autolizado de fermento de cerveja no ganho de peso de bezerros da Raça Gir. O autolizado de fermento de cerveja é um sub-produto da fabricação de cerveja e apresenta-se rico em aminoácidos, vitaminas e minerais. No experimento foram utilizados 32 bezerros da Raça Gir, machos e fêmeas, distribuídos em blocos casualizados que receberam quatro níveis do dosagens diárias (0; 1; 2 e 3 kg do produto. Após 196 dias de experimento concluiu-se que existe relação significativa entre o ganho de peso e a suplementação com o autolizado e que a dosagem/dia mais adequada é de 1 kg.

    The purpose of this paper is to study the influence of autolyzed beer yeast in the increase weight of Gir calves. The autolyzed beer yeast is a by-product of beer brewing. It is rich ix aminoacids, vitamins and minerals. In the experiment there were 32 Gir calves, male and female, divided into aleatory groups, receiving 4 different revels of daily portions (0; 1; 2 and 3kg of the beer yeast. After 196 days of testing, a significant relationship between the increase of weight and the use of autolyzed beer yeast was observed. The amimals must recieve 1 kg of beer yeast daily.

  5. Application and issues of online maintenance for equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Higasa, Hisakazu

    2011-01-01

    The maintenance systems for long-term safety and repair costs reduction of equipment of nuclear power plants are stated. Planned maintenance contained the breakdown maintenance (BM) and the preventive maintenance, which consists of the time based maintenance (MBM) and the condition based maintenance (CBM). Explained are the characteristics of equipments, maintenance methods, maintenance solutions and the self-evaluation maintenance power, damage mechanism and solutions, and monitoring tools and application. Stated are the maintenance system and application of monitoring technology, periodical maintenance, application of diagnosis, vibration monitoring techniques, decision of vibration monitoring, and application of monitoring techniques for improvement of maintenance. Illustrated are realization of planned maintenance by reorganization of maintenance, a trend of maintenance of equipments, table of classified maintenance systems, change of maintenance program, maintenance data and investigation of damage mechanism, examples of self-evaluation maintenance power, examples of analysis of damage of parts of equipments, evaluation of rotating machines by vibration method, examples of results of diagnosis of bearing of rotating machines, online maintenance system of Asahi Kasei Engineering Corporation, degradation pattern of pomp, estimation of lifetime by total vibration and vibration on acceleration, and improvement of equipments. (S.Y.)

  6. Expert system for maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ito, Tetsuo; Kasahara, Takayasu; Watanabe, Takao; Matsuki, Tsutomu.

    1989-01-01

    The basic function of the expert system which supports the maintenance works such as the diagnosis of nuclear power plants and the planning of maintenance works was developed. For the maintenance of large scale plants like nuclear power plants, much manpower is required. Consequently, it has been desired to develop the system for improving the maintainability by utilizing the expertise and empirical knowledge of skilled engineers. This system comprises the subsystems for aiding plant diagnosis and maintenance work planning. The former diagnoses the contents of out of order based on the knowledge base, and thereafter, guides the method of taking measures using simulator. The latter establishes the plan by using the method of limiting branching together so that the maintenance works do not interfere mutually or do not affect the operation. Hereafter, it is intended to improve the man-machine condition and expand knowledge aiming at the practical use. The outline of the system, the constitution of subsystems, the example of plant diagnosis, the support of plant maintenance work planning and so on are reported. (K.I.)

  7. Automotive Maintenance Data Base for Model Years 1976-1979. Part II : Appendix E and F

    Science.gov (United States)

    1980-12-01

    An update of the existing data base was developed to include life cycle maintenance costs of representative vehicles for the model years 1976-1979. Repair costs as a function of time are also developed for a passenger car in each of the compact, subc...

  8. Maintenance manual. Vol. 1. Maintenance management; 2. completely rev. ed.; Handbuch Instandhaltung. Bd. 1. Instandhaltungsmanagement

    Energy Technology Data Exchange (ETDEWEB)

    Warnecke, H.J. [ed.] [Fraunhofer-Institut fuer Produktionstechnik und Automatisierung (IPA), Stuttgart (Germany)

    1992-12-31

    This manual is the second, completely revised edition of the standard manual ``Maintenance - Fundamentals``, which was first published in 1981. It presents an outline of all relevant fields of maintenance today and contains practical information on new and established methods of maintenance management and technology. With its comprehensive concept, which addresses any industrial enterprise that wants to remain competitive, the manual is indispensable for maintenance managers in industry, service enterprises and consultancies. Vol.1, ``Maintenance Management``, informs the reader on fundamentals, design with a view to maintenance, organisation of maintenance work, personnel management, industrial safety and economic aspects of maintenance. Current issues such as product liability, electronic data processing, expert systems, environmental protection, controlling based on characteristic data, etc. are gone into. Graphical representations, concrete procedural information and exemplary solutions may be used directly as working tools for the practice of maintenance. (orig.) [Deutsch] Das vorliegende Handbuch ist die zweite, voellig ueberarbeitete und erweiterte Auflage des Standardwerkes ``Instandhaltung - Grundlagen``, das 1981 erstmals erschien. Es gibt einen Ueberblick ueber alle relevanten Gebiete einer modernen Instandhaltung und vermittelt praxisnahes Wissen ueber neue und bewaehrte Methoden und Verfahren des Instandhaltungsmanagements und der Instandhaltungstechnik. Mit dieser umfassenden Konzeption, die auf die Belange des im Wettbewerb stehenden Industriebetriebes ausgerichtet ist, wendet sich das Handbuch an die Fuehrungskraefte der Instandhaltung in der Industrie sowie an Dienstleistungs- und Beratungsunternehmen. Im Band 1 ``Instandhaltungsmanagement`` kann sich der Leser ueber Grundlagen, instandhaltungsgerechtes Konstruieren, Organisation der Instandhaltung, Personalmanagement, Arbeitssicherheit sowie Wirtschaftlichkeit der Instandhaltung informieren

  9. The improvement of maintenance service for traction networks equipment on the base of process approach

    Directory of Open Access Journals (Sweden)

    D. V. Mironov

    2014-12-01

    Full Text Available Purpose. The new methods development for improving the maintenance service for equipment of traction networks in order to increase its efficiency and quality. Methodology. In world practice of solving problems related to the quality of products and services is usually achieved by introducing quality management system in to the enterprises. The provisions of quality management system were used for solving the problem. The technologies of process engineering were used for describing the main stages of maintenance service. Findings. The development of high-speed movement and growth of its intensity, the use of electric rolling stock of a new generation require the introduction of new methods diagnostics of equipment technical state and improvement of the existing maintenance system and repair of power supply. Developing a model of business-processes, their optimization with using techniques of process engineering and system management is needed for the transition to the management system based on the process approach. From the standpoint of the process approach and in accordance with the requirements of the quality management system (ISO 9001-2009, the operation of the E (Department of electrification and power supply infrastructure sector is represented as a scheme of business-processes in which the guaranteed supply with electricity of railway and third-party consumers is defined as the main business-process of management. Each of the sub-process of power supply for consumers is described in details. The use methods and main stages of process approach for sample management system reorganization were investigated. The methodology and the application method of PDCA (Plan-Do-Check-Act closed loop to the equipment maintenance system were described. The monitoring process of traction networks maintenance using the process approach was divided into components after investigations. The technical documentation of maintenance service was investigated in

  10. Reliability centred maintenance of nuclear power plant facilities

    International Nuclear Information System (INIS)

    Kovacs, Zoltan; Novakova, Helena; Hlavac, Pavol; Janicek, Frantisek

    2011-01-01

    A method for the optimization of preventive maintenance nuclear power plant equipment, i.e. reliability centred maintenance, is described. The method enables procedures and procedure schedules to be defined such as allow the maintenance cost to be minimized without compromising operational safety or reliability. Also, combinations of facilities which remain available and ensure reliable operation of the reactor unit during the maintenance of other pieces of equipment are identified. The condition-based maintenance concept is used in this process, thereby preventing unnecessary operator interventions into the equipment, which are often associated with human errors. Where probabilistic safety assessment is available, the most important structures, systems and components with the highest maintenance priority can be identified. (orig.)

  11. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  12. Application of T2 Control Charts and Hidden Markov Models in Condition-Based Maintenance at Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Emilija Kisić

    2015-01-01

    Full Text Available An innovative approach to condition-based maintenance of coal grinding subsystems at thermoelectric power plants is proposed in the paper. Coal mill grinding tables become worn over time and need to be replaced through time-based maintenance, after a certain number of service hours. At times such replacement is necessary earlier or later than prescribed, depending on the quality of the coal and of the grinding table itself. Considerable financial losses are incurred when the entire coal grinding subsystem is shut down and the grinding table found to not actually require replacement. The only way to determine whether replacement is necessary is to shut down and open the entire subsystem for visual inspection. The proposed algorithm supports condition-based maintenance and involves the application of T2 control charts to distinct acoustic signal parameters in the frequency domain and the construction of Hidden Markov Models whose observations are coded samples from the control charts. In the present research, the acoustic signals were collected by coal mill monitoring at the thermoelectric power plant “Kostolac” in Serbia. The proposed approach provides information about the current condition of the grinding table.

  13. Influência do período de alimentação no consumo e ganho de peso do pirarucu Influence of feeding period on consumption and weight gain of pirarucu

    Directory of Open Access Journals (Sweden)

    Roger Crescêncio

    2005-12-01

    Full Text Available O objetivo deste trabalho foi verificar o período preferencial de consumo alimentar do pirarucu, Arapaima gigas, e a influência de diferentes turnos de alimentação no consumo e ganho de peso dessa espécie. Foram testados três tratamentos: alimentação diurna (peixes alimentados às 9h e 15h, alimentação noturna (peixes alimentados às 21h e 3h e alimentação contínua (peixes alimentados às 9h, 15h, 21h e 3h. Cada tratamento foi avaliado em triplicata, com cada unidade experimental formada por oito peixes, com peso médio de 313 g, estocados em tanques-redes de 1 m³ (1x1x1 m. Os nove tanques-redes foram alocados em um viveiro escavado de 120 m². O experimento durou 60 dias. A alimentação contínua promoveu maiores ganhos de peso e biomassa, taxa de crescimento específico e consumo total. Os tratamentos alimentação diurna e alimentação noturna apresentaram ganho de peso semelhante, porém, a alimentação diurna apresentou a melhor conversão alimentar. O período preferencial de alimentação do pirarucu foi o noturno, principalmente no começo da noite. Os dados deste estudo indicam que o horário de preferência alimentar não é o melhor horário de alimentação do pirarucu, em uma criação comercial. O período de alimentação mais indicado para a espécie, baseado na capacidade de conversão alimentar, é o diurno.The objective of this study was to verify pirarucu Arapaima gigas preferential time of feeding, and the influence of different feeding periods on consumption and weight gain of this species. Three treatments were tested: diurnal feeding (fish fed at 9h and 15h, nocturnal feeding (fish fed at 21h and 3h, and continuous feeding (fish fed at 9h, 15h, 21h and 3h. Each treatment was evaluated in triplicate, and each trial unit had eight fishes with 313 g average weight, stoked into a 1 m³ (1x1x1 m net cage. The nine net cages were located on a 120 m² earth pond. The trial lasted for 60 days. Continuous feeding

  14. Safety constraints applied to an adaptive Bayesian condition-based maintenance optimization model

    International Nuclear Information System (INIS)

    Flage, Roger; Coit, David W.; Luxhøj, James T.; Aven, Terje

    2012-01-01

    A model is described that determines an optimal inspection and maintenance scheme for a deteriorating unit with a stochastic degradation process with independent and stationary increments and for which the parameters are uncertain. This model and resulting maintenance plans offers some distinct benefits compared to prior research because the uncertainty of the degradation process is accommodated by a Bayesian approach and two new safety constraints have been applied to the problem: (1) with a given subjective probability (degree of belief), the limiting relative frequency of one or more failures during a fixed time interval is bounded; or (2) the subjective probability of one or more failures during a fixed time interval is bounded. In the model, the parameter(s) of a condition-based inspection scheduling function and a preventive replacement threshold are jointly optimized upon each replacement and inspection such as to minimize the expected long run cost per unit of time, but also considering one of the specified safety constraints. A numerical example is included to illustrate the effect of imposing each of the two different safety constraints.

  15. Desempenho produtivo de fêmeas leiteiras alimentadas com silagem de milho e concentrado à base de farelo de soja ou farelo de algodão Productive performance of growing dairy heifers fed corn silage and soybean or cottonseed meal based concentrate

    Directory of Open Access Journals (Sweden)

    Stefanie Alvarenga Santos

    2010-03-01

    Full Text Available Foram avaliadas dietas com silagem de milho e concentrado à base de farelo de soja ou farelo de algodão para fêmeas leiteiras. Quatro dietas experimentais foram constituídas da combinação de dois níveis de concentrado (1 ou 2 kg e duas fontes proteicas (farelo de soja ou farelo de algodão. Observou-se efeito da interação nível de concentrado × fonte proteica no consumo de matéria seca (MS, fibra em detergente neutro (FDN e no consumo de nutrientes digestíveis totais (NDT. A quantidade de concentrado influenciou os consumos de proteína bruta (PB, FDN, extrato etéreo (EE, carboidratos nãofibrosos (CNF, matéria orgânica (MO e de PB por kg de NDT. Não houve efeito nas digestibilidades da MS, FDN, MO e para NDT, porém a fonte proteica influenciou as digestibilidades de PB, EE e CNF. Houve efeito da quantidade de concentrado sobre o ganho de peso (GP e da interação quantidade de concentrado × fonte proteica sobre o ganho de peso por cm de ganho em altura da cernelha. A dieta com 1 kg de concentrado à base de farelo de algodão foi insuficiente para ganho de peso de 800 g/dia, enquanto as dietas com 2 kg de concentrado propiciaram o maior ganho de peso. Entretanto, a dieta constituída de 2 kg de concentrado à base de farelo de soja foi mais eficiente, pois propiciou maior crescimento linear das novilhas, com ganho médio de 820 g por dia. Equações de predição do peso corporal com base no perímetro torácico apresentam maior acurácia em relação a equações baseadas em outras medidas lineares.Diets for dairy heifers were assessed with corn silage and soybean or cotton seed based concentrate. Four experimental diets consisting of the combination of two concentrate levels, 1 or 2 kg, and two protein sources, soybean meal or cotton seed meal. The effect of the interaction was observed for intake of dry matter (DM, neutral detergent fiber (NDF in % live weight and total digestible nutrient intake (TDN. The quantity of

  16. Availability analysis of mechanical systems with condition-based maintenance using semi-Markov and evaluation of optimal condition monitoring interval

    Science.gov (United States)

    Kumar, Girish; Jain, Vipul; Gandhi, O. P.

    2018-03-01

    Maintenance helps to extend equipment life by improving its condition and avoiding catastrophic failures. Appropriate model or mechanism is, thus, needed to quantify system availability vis-a-vis a given maintenance strategy, which will assist in decision-making for optimal utilization of maintenance resources. This paper deals with semi-Markov process (SMP) modeling for steady state availability analysis of mechanical systems that follow condition-based maintenance (CBM) and evaluation of optimal condition monitoring interval. The developed SMP model is solved using two-stage analytical approach for steady-state availability analysis of the system. Also, CBM interval is decided for maximizing system availability using Genetic Algorithm approach. The main contribution of the paper is in the form of a predictive tool for system availability that will help in deciding the optimum CBM policy. The proposed methodology is demonstrated for a centrifugal pump.

  17. Data mining and statistical process control for condition-based maintenance; Datamining und statistische Prozesskontrolle zur zustandsorientierten Instandhaltung

    Energy Technology Data Exchange (ETDEWEB)

    Deeskow, Peter; Steinmetz, Urs; Hay, Martin [Evonik Energy Services, Essen (Germany)

    2008-07-01

    Optimum, condition-based maintenance should balance the commercial consequences of an efficiency loss or a component failure and the cost of maintenance. This requires an early and highly reliable detection of abnormalities of the component/unit behaviour. For this purpose key performance indicators (KPIs) can be used which are online calculated from operational measurements and which solely depend on the component condition and do not depend on other influencing factors such as operation mode, load or ambient conditions. Software tools using data mining methods can facilitate the definition and calculation of such KPIs. (orig.)

  18. Multi-criteria weighted order based maintenance decision making

    NARCIS (Netherlands)

    Dhanisetty, V.S.V.; Verhagen, W.J.C.; Curran, R.

    2017-01-01

    Decision making in daily maintenance requires consideration of multiple factors. The importance of each of the factors fluctuates depending on the repair scenario and the needs of the maintainer. In order to include the prioritisation of multiple criteria, a weighted decision making model is

  19. Incorporation of Outcome-Based Contract Requirements in a Real Options Approach for Maintenance Planning

    Science.gov (United States)

    2016-04-30

    corrective maintenance (which increases as the RUL is used up), while maximizing the revenue earned during the RUL (which increases as the RUL is used up...running the system to failure, then performing corrective maintenance The value from exercising the option is the sum of the cumulative revenue loss...and the avoided corrective maintenance cost. The cumulative revenue loss is what the system would earn between the predictive maintenance event and

  20. Integration of infrared thermography into various maintenance methodologies

    Science.gov (United States)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  1. Two Innovative Steps for Training on Maintenance: 'VIRMAN' Spanish Project based on Virtual Reality 'STARMATE' European Project based on Augmented Reality

    International Nuclear Information System (INIS)

    Gonzalez Anez, Francisco

    2002-01-01

    This paper presents two development projects (STARMATE and VIRMAN) focused on supporting training on maintenance. Both projects aim at specifying, designing, developing, and demonstrating prototypes allowing computer guided maintenance of complex mechanical elements using Augmented and Virtual Reality techniques. VIRMAN is a Spanish development project. The objective is to create a computer tool for maintenance training course elaborations and training delivery based on 3D virtual reality models of complex components. The training delivery includes 3D record displays on maintenance procedures with all complementary information for intervention understanding. Users are requested to perform the maintenance intervention trying to follow up the procedure. Users can be evaluated about the level of knowledge achieved. Instructors can check the evaluation records left during the training sessions. VIRMAN is simple software supported by a regular computer and can be used in an Internet framework. STARMATE is a forward step in the area of virtual reality. STARMATE is a European Commission project in the frame of 'Information Societies Technologies'. A consortium of five companies and one research institute shares their expertise in this new technology. STARMATE provides two main functionalities (1) user assistance for achieving assembly/de-assembly and following maintenance procedures, and (2) workforce training. The project relies on Augmented Reality techniques, which is a growing area in Virtual Reality research. The idea of Augmented Reality is to combine a real scene, viewed by the user, with a virtual scene, generated by a computer, augmenting the reality with additional information. The user interface is see-through goggles, headphones, microphone and an optical tracking system. All these devices are integrated in a helmet connected with two regular computers. The user has his hands free for performing the maintenance intervention and he can navigate in the virtual

  2. Data Base Development of Automobile and Light Truck Maintenance : Volume I. Test and Appendixes A-D

    Science.gov (United States)

    1978-08-01

    The volume describes the development of the life cycle maintenance costs for 212 sales-leading 1970 through 1975 passenger cars and light trucks. These costs provide a data base for the Department of Transportation, which describes the costs for part...

  3. Basic study of the plant maintenance model considering plant improvement/modification

    International Nuclear Information System (INIS)

    Tsumaya, Akira; Inoue, Kazuya; Mochizuki, Masahito; Wakamatsu, Hidefumi; Arai, Eiji

    2007-01-01

    This paper proposes a maintenance activity model that considers not only routine maintenance activity but also functional maintenance including improvement/modification. Required maintenance types are categorized, and limitation of Activity Domain Integration Diagram (ADID) proposed by ISO18435 are discussed based on framework for life cycle maintenance management of manufacturing assets. Then, we proposed extension ADID model for plant maintenance activity model considering functional improvement/modification. (author)

  4. Louisiana DOTD maintenance budget allocation system: final report.

    Science.gov (United States)

    2002-11-01

    This project developed a computer system to assist Louisiana Department of Transportation and Development (LA DOTD) maintenance managers in the preparation of zero-based, needs-driven annual budget plans for routine maintenance. This includes pavemen...

  5. Comparing Weight Loss-Maintenance Outcomes of a Worksite-Based Lifestyle Program Delivered via DVD and Face-to-Face: A Randomized Trial.

    Science.gov (United States)

    Ing, Claire Townsend; Miyamoto, Robin E S; Fang, Rui; Antonio, Mapuana; Paloma, Diane; Braun, Kathryn L; Kaholokula, Joseph Keawe'aimoku

    2018-03-01

    Native Hawaiians and other Pacific Islanders have high rates of overweight and obesity compared with other ethnic groups in Hawai'i. Effective weight loss and weight loss-maintenance programs are needed to address obesity and obesity-related health inequities for this group. Compare the effectiveness of a 9-month, worksite-based, weight loss-maintenance intervention delivered via DVD versus face-to-face in continued weight reduction and weight loss maintenance beyond the initial weight loss phase. We tested DVD versus face-to-face delivery of the PILI@Work Program's 9-month, weight loss-maintenance phase in Native Hawaiian-serving organizations. After completing the 3-month weight loss phase, participants ( n = 217) were randomized to receive the weight loss-maintenance phase delivered via trained peer facilitators or DVDs. Participant assessments at randomization and postintervention included weight, height, blood pressure, physical functioning, exercise frequency, and fat intake. Eighty-three face-to-face participants were retained at 12 months (74.1%) compared with 73 DVD participants (69.5%). There was no significant difference between groups in weight loss or weight loss maintenance. The number of lessons attended in Phase 1 of the intervention (β = 0.358, p = .022) and baseline systolic blood pressure (β = -0.038, p = .048) predicted percent weight loss at 12 months. Weight loss maintenance was similar across groups. This suggests that low-cost delivery methods for worksite-based interventions targeting at-risk populations can help address obesity and obesity-related disparities. Additionally, attendance during the weight loss phase and lower baseline systolic blood pressure predicted greater percent weight loss during the weight loss-maintenance phase, suggesting that early engagement and initial physical functioning improve long-term weight loss outcomes.

  6. Context-Dependent Prognostics and Health Assessment: A Condition-Based Maintenance Approach That Supports Mission Compliance

    Energy Technology Data Exchange (ETDEWEB)

    Allgood, G.O.; Kercel, S.W.

    1999-04-19

    In today's manufacturing environment, plants, systems, and equipment are being asked to perform at levels not thought possible a decade ago. The intent is to improve process operations and equipment reliability, availability, and maintainability without costly upgrades. Of course these gains must be achieved without impacting operational performance. Downsizing is also taking its toll on operations. Loss of personnel, particularly those who represent the corporate history, is depleting US industries of their valuable experiential base which has been relied on so heavily in the past. These realizations are causing companies to rethink their condition-based maintenance policies by moving away from reacting to equipment problems to taking a proactive approach by anticipating needs based on market and customer requirements. This paper describes a different approach to condition-based maintenance-context-dependent prognostics and health assessment. This diagnostic capability is developed around a context-dependent model that provides a capability to anticipate impending failures and determine machine performance over a protracted period of time. This prognostic capability links operational requirements to an economic performance model. In this context, a system may provide 100% operability with less than 100% functionality. This paradigm is used to facilitate optimal logistic supply and support.

  7. RCM optimization of a system under both preventive and corrective maintenance

    International Nuclear Information System (INIS)

    Bris, R.; Cepin, M.

    2005-01-01

    Testing and maintenance activities of power electrical equipment are an important potential for both risk and cost reduction. A multi-objective maintenance optimization method is presented based on the Genetic Algorithms (GA) technique. The method determines the optimal schedule of preventive maintenance actions based on minimization both selected risk measure and cost. Applied cost model takes into account both preventive and corrective maintenance. This paper also presents application of the methodology to optimize maintenance of a real distribution network 22 kV. Conclusions and recommendations for practice are made on the basis of obtained results. (author)

  8. Optimization of reliability centered predictive maintenance scheme for inertial navigation system

    International Nuclear Information System (INIS)

    Jiang, Xiuhong; Duan, Fuhai; Tian, Heng; Wei, Xuedong

    2015-01-01

    The goal of this study is to propose a reliability centered predictive maintenance scheme for a complex structure Inertial Navigation System (INS) with several redundant components. GO Methodology is applied to build the INS reliability analysis model—GO chart. Components Remaining Useful Life (RUL) and system reliability are updated dynamically based on the combination of components lifetime distribution function, stress samples, and the system GO chart. Considering the redundant design in INS, maintenance time is based not only on components RUL, but also (and mainly) on the timing of when system reliability fails to meet the set threshold. The definition of components maintenance priority balances three factors: components importance to system, risk degree, and detection difficulty. Maintenance Priority Number (MPN) is introduced, which may provide quantitative maintenance priority results for all components. A maintenance unit time cost model is built based on components MPN, components RUL predictive model and maintenance intervals for the optimization of maintenance scope. The proposed scheme can be applied to serve as the reference for INS maintenance. Finally, three numerical examples prove the proposed predictive maintenance scheme is feasible and effective. - Highlights: • A dynamic PdM with a rolling horizon is proposed for INS with redundant components. • GO Methodology is applied to build the system reliability analysis model. • A concept of MPN is proposed to quantify the maintenance sequence of components. • An optimization model is built to select the optimal group of maintenance components. • The optimization goal is minimizing the cost of maintaining system reliability

  9. Comparative evaluation of remote maintenance schemes for fusion DEMO reactor

    Energy Technology Data Exchange (ETDEWEB)

    Utoh, Hiroyasu, E-mail: uto.hiroyasu@jaea.go.jp; Tobita, Kenji; Someya, Youji; Asakura, Nobuyuki; Sakamoto, Yoshiteru; Hoshino, Kazuo; Nakamura, Makoto

    2015-10-15

    Highlights: • Various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. • The banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme. • The key engineering issues are in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability. - Abstract: Maintenance schemes are one of the critical issues in DEMO design, significantly affecting the configuration of in-vessel components, the size of toroidal field (TF) coil, the arrangement of poloidal field (PF) coils, reactor building, hot cell and so forth. Therefore, the maintenance schemes should satisfy many design requirements and criteria to assure reliable and safe plant operation and to attain reasonable plant availability. The plant availability depends on reliability of remote maintenance scheme, inspection of pipe connection and plasma operation. In this paper, various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. From the view points of the reliability of inspection on hot cell, TF coil size, stored energy of PF coil and portability of segment, the banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme, and it has key engineering issues such as in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability.

  10. Comparative evaluation of remote maintenance schemes for fusion DEMO reactor

    International Nuclear Information System (INIS)

    Utoh, Hiroyasu; Tobita, Kenji; Someya, Youji; Asakura, Nobuyuki; Sakamoto, Yoshiteru; Hoshino, Kazuo; Nakamura, Makoto

    2015-01-01

    Highlights: • Various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. • The banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme. • The key engineering issues are in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability. - Abstract: Maintenance schemes are one of the critical issues in DEMO design, significantly affecting the configuration of in-vessel components, the size of toroidal field (TF) coil, the arrangement of poloidal field (PF) coils, reactor building, hot cell and so forth. Therefore, the maintenance schemes should satisfy many design requirements and criteria to assure reliable and safe plant operation and to attain reasonable plant availability. The plant availability depends on reliability of remote maintenance scheme, inspection of pipe connection and plasma operation. In this paper, various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. From the view points of the reliability of inspection on hot cell, TF coil size, stored energy of PF coil and portability of segment, the banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme, and it has key engineering issues such as in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability.

  11. Reliability Centered Maintenance - Methodologies

    Science.gov (United States)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  12. Desempenho e tamanho de vísceras de cordeiros Santa Inês após ganho compensatório Performance and size of viscera of Santa Inês lambs after compensatory gain

    Directory of Open Access Journals (Sweden)

    Thais Romano de Vasconcelos e Almeida

    2011-03-01

    Full Text Available Objetivou-se avaliar o crescimento, o desempenho e o tamanho das vísceras de cordeiros Santa Inês após ganho compensatório. Foram utilizados 22 animais de duas faixas de peso vivo inicial, leves (33,5 kg e pesados (56,8 kg, distribuídos em três regimes alimentares: controle, com consumo à vontade; restrição alimentar, com consumo para manutenção do peso vivo; e crescimento compensatório, com restrição alimentar e posterior consumo à vontade até peso vivo semelhante ao dos animais controle, quando foram abatidos. As dietas experimentais, constituídas de feno de capim Coast-cross (Cynodon dactylon moído e concentrado composto de farelo de soja (Glicine max L., milho (Zea mays L., polpa cítrica, ureia pecuária e suplemento mineral e vitamínico, atenderam às necessidades nutricionais para os diferentes objetivos. Os animais em restrição alimentar apresentaram os piores resultados de peso vivo final, consumo de matéria seca, ganho de peso, conversão alimentar e peso relativo do fígado, enquanto, naqueles em crescimento compensatório, o peso vivo final, a conversão alimentar e o peso de fígado foram semelhantes aos dos animais em crescimento contínuo. O consumo entre os animais pesados em crescimento contínuo foi superior ao daqueles mantidos nos demais regimes alimentares. No grupo de animais leves em crescimento compensatório, o ganho de peso foi maior que naqueles em crescimento contínuo e, nesses dois grupos, foi superior ao dos animais em restrição alimentar. Os animais pesados, no entanto, apresentaram ganho de peso vivo semelhante ao dos animais controle. Cordeiros podem apresentar crescimento compensatório, que depende do grau de maturidade dos animais.The objective of this experiment was to evaluate the growth, performance and size of viscera of Santa Inês lambs after compensatory gain. Twenty-two animals, with two ranges of initial body weights, light (33.5 kg and heavy (56.8 kg, were allotted to one of

  13. On maintenance management of wind and nuclear power plants

    International Nuclear Information System (INIS)

    Nilsson, Julia

    2009-11-01

    Electrical production in Sweden today is mainly from nuclear and hydro power. However, there is large increase in renewable energy like wind power and the installed new capacity goals are large. Several electrical production sources are important for the sustainability of the energy system. Maintenance is an approach for keeping a system sustainable. The importance of structured maintenance for reliable electrical production systems triggers the development of qualitative and quantitative maintenance management methods. Examples of these methods are Reliability-Centered Maintenance (RCM) which is a structured qualitative approach that focuses on reliability when planning maintenance, and Reliability Centered Asset Management (RCAM) which is a development of RCM into a quantitative approach with the aim to relate preventive maintenance to total maintenance cost and system reliability. This thesis presents models, as applications of RCAM, based on the methods of Life Cycle Cost (LCC) and mathematical optimization, applied to wind and nuclear power plants. Both deterministic and stochastic approaches have been used and the proposed models are based on the Total Cost model, which summarizes costs for maintenance and production loss, and the Aircraft model, which is an opportunistic maintenance optimization model. Opportunistic maintenance is preventive maintenance performed at opportunities. The wind power applications in this study show on different ways to cover costs of condition monitoring systems (CMS) and further on economic benefits of these when uncertainties of times to failure are included in the model. The nuclear power applications show on that the optimization model is dependent on the discount rate and that a high discount rate gives more motivation for opportunistic replacements. When put into a stochastic framework and compared to other maintenance strategies it is shown that an extended opportunistic maintenance optimization model has a good overall

  14. Análise do extrato aquoso de Arachis hipoagea L. no combate à dislipidemia e ao ganho ponderal de ratos Wistar submetidos à dieta hiperlipídica1

    Directory of Open Access Journals (Sweden)

    Thárcia K.B. de Oliveira

    Full Text Available RESUMO: O objetivo desse estudo foi avaliar os efeitos do Extrato Aquoso de Amendoim (EAA no peso, bioquímica sérica e na histologia hepática de ratos Wistar submetidos a dietas normo e hiperlipídicas. A pesquisa foi realizada utilizando 40 ratos Wistar machos, divididos em quatro grupos (n=10: GA (dieta hiperlipídica, GB (dieta hiperlipídica +EAA, GC (dieta normolipídica e GD (dieta normolipídica +EAA. Após 8 semanas, os animais foram eutanasiados e foram coletadas amostras sanguíneas para a avaliação de dados bioquímicos (Colesterol total e suas frações, triglicerídeos, uréia, creatinina, AST, ALT e glicemia e fragmentos do fígado para análise histológica. Os animais do grupo GB tiveram um ganho de peso inferior quando comparados ao GA (XGB= versus XGA= p<0,05, já os grupos GC e GD não obtiveram diferenças estatísticas. Os animais que receberam o EAA tiveram uma redução nos níveis de colesterol (XGB= versus XGA= p<0,05 e XGD= versus XGA= p<0,01, dos triglicerídeos (XGB= versus XGA e XGD= versus XGA= p<0,001 e mais discretamente dos níveis de ALT. A glicemia, uréia e creatina permaneceram dentro dos valores de referência. As amostras hepáticas analisadas, dos ratos dos diferentes grupos, não apresentaram alterações histopatológicas. Conclui-se que O EAA apresentou efeitos preventivos sobre o ganho ponderal e dislipidemia.

  15. EFEITOS DA SUPLEMENTAÇÃO DE ß-HIDROXI ß-METILBUTIRATO (HMB SOBRE O GANHO DE MASSA MUSCULAR: UMA REVISÃO DOS ASPECTOS ATUAIS

    Directory of Open Access Journals (Sweden)

    RENATA REBELLO MENDES

    2009-07-01

    Full Text Available

    O ganho de massa muscular tem sido tema bastante discutido nas últimas décadas, gerando reflexões sobre métodos eficientes de Se alcançar tal fenômeno. Dentre os métodos mais elucidados, encontram-se o exercício de resistência, os agentes farmacológicos e os suplementos nutricionais. Nesta última classificação, destaca-se atualmente o HMB, um metabólito da leucina. O HMB, associado a treinamentos de resistência, tem sido mencionado como importante inibidor do catabolismo muscular. Acredita-se que a interação entre a suplementação de HMB e o metabolismo protéico seja mediado por uma maior disponibilidade de colesterol, que, por sua vez, é destinado à síntese e regeneração de membranas celulares. Estudos envolvendo suplementação de HMB e indivíduos sedentários em início de treinamento têm demonstrado resultados bastante satisfatórios, em relação ao ganho de massa magra e de força. Porém, em se tratando de indivíduos treinados, os resultados observados têm sido pouco relevantes. Portanto, considera-se necessária a realização de novos estudos comparativos entre altletas e sedentários, objetivando a obtenção de dados mais consistentes.

  16. A process for risk-focused maintenance

    International Nuclear Information System (INIS)

    Lofgren, E.V.; Cooper, S.E.; Kurth, R.E.; Phillips, L.B.

    1991-03-01

    This report presents a process for focusing maintenance resources on components that enable nuclear plant systems to perform their essential functions and on components whose failure may initiate challenges to safety systems, so as to have the greatest impact in decreasing risk. The process provides criteria, based on risk, for deciding which components are critical to risk and determining what maintenance activities are required to ensure reliable operation of those risk-critical components. Two approaches are provided for selection of risk-critical components. One approach uses the results of a Probabilistic Risk Assessment (PRA); the other is based on the methodology developed for this report, which has a basis in PRA although it does not use the results of a PRA study. Following identification of risk-critical components, both approaches use a single methodology for determining what maintenance activities are required to ensure reliable operation of the identified components. The report also provides demonstrations of application of the two approaches to selection of risk-critical components and demonstrations of application of the methodology for determining what maintenance activities are required to an active standby safety system, a normally operating system, and passive components. 5 refs., 11 figs., 1 tab

  17. A process for risk-focused maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lofgren, E.V.; Cooper, S.E.; Kurth, R.E.; Phillips, L.B. (Science Applications International Corp., McLean, VA (USA))

    1991-03-01

    This report presents a process for focusing maintenance resources on components that enable nuclear plant systems to perform their essential functions and on components whose failure may initiate challenges to safety systems, so as to have the greatest impact in decreasing risk. The process provides criteria, based on risk, for deciding which components are critical to risk and determining what maintenance activities are required to ensure reliable operation of those risk-critical components. Two approaches are provided for selection of risk-critical components. One approach uses the results of a Probabilistic Risk Assessment (PRA); the other is based on the methodology developed for this report, which has a basis in PRA although it does not use the results of a PRA study. Following identification of risk-critical components, both approaches use a single methodology for determining what maintenance activities are required to ensure reliable operation of the identified components. The report also provides demonstrations of application of the two approaches to selection of risk-critical components and demonstrations of application of the methodology for determining what maintenance activities are required to an active standby safety system, a normally operating system, and passive components. 5 refs., 11 figs., 1 tab.

  18. Managing the maintenance inventory of a cement manufacturer

    Directory of Open Access Journals (Sweden)

    Morne Eloff

    2013-11-01

    Full Text Available Inventory management is a crucial aspect of managing a company successfully. This is even more apparent in the case of maintenance inventories for production equipment, which impact directly on production equipment efficiency. This is a typical inventory management issue for a cement manufacturer that faces the problem of managing its maintenance inventories optimally when certain maintenance items have exceptionally long lead times (100 weeks and values in excess of R500 000. An assessment of the cement manufacturer’s approach to managing its maintenance inventories indicated various shortcomings, which have resulted in a significant level of obsolescence. One approach to managing maintenance inventories efficiently is to implement a classification of the inventory items in terms of their criticality to the cement production process. The critical nature of a component could be established through a risk-based approach (minimisation of the risk of production loss and taking into account the type of maintenance (planned vs unplanned that the component is required for. A risk-based approach should form the basis of the maintenance inventory management of the cement manufacturer as this would allow the cement manufacturer to utilise other inventory management methods effectively. In addition, it is important to ensure that employees are well versed in the different inventory management approaches utilised and that high levels of integration between departments are pursued.

  19. Development of maintenance knowledge management system for power plant

    International Nuclear Information System (INIS)

    Ohi, Tadashi; Hirai, Kenji

    2004-01-01

    This paper describes the knowledge management framework to systematize maintenance knowledge in power plant. The features of the framework are (1) to construct a decision tree of trouble cases incrementally based on Ripple Down Rules (RDR) method and (2) to decide the timing of installing new knowledge based on several metrics obtained by evaluating a structure of a decision tree. We are developing the experimental prototype of maintenance knowledge management system. The system is integrated with plant database (ex. the operation journals and maintenance records). The management of trouble cases is based on the format of XML. For practical purpose, each trouble case is linked with related data (ex. maintenance manuals, equipment configuration, records). Plant workers can easily search for maintenance knowledge and relevant data by specifying observed status. On the other hand, knowledge engineers can monitor occurrence counts of exceptional cases to each node. The metrics calculation gives a cue to locate the effective node for improving the efficiency of retrieval. We are evaluating the functionality and the effectiveness of the system through the application to maintenance work of controller systems. We believe that this framework will be helpful to share common knowledge among plant sites as well as to manage site-specific knowledge. (author)

  20. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  1. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  2. Optimal policies for cumulative damage models with maintenance last and first

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Qian, Cunhua; Nakagawa, Toshio

    2013-01-01

    From the economical viewpoint of several combined PM policies in reliability theory, this paper takes up a standard cumulative damage model in which the notion of maintenance last is applied, i.e., the unit undergoes preventive maintenances before failure at a planned time T, at a damage level Z, or at a shock number N, whichever occurs last. Expected cost rates are detailedly formulated, and optimal problems of two alternative policies which combine time-based with condition-based preventive maintenances are discussed, i.e., optimal T L ⁎ for N, Z L ⁎ for T, and N L ⁎ for T are rigorously obtained. Comparison methods between such maintenance last and conventional maintenance first are explored. It is determined theoretically and numerically which policy should be adopted, according to the different methods in different cases when the time-based or the condition-based PM policy is optimized.

  3. Predictive maintenance policy for a gradually deteriorating system subject to stress

    Energy Technology Data Exchange (ETDEWEB)

    Deloux, E. [IRCCyN/Ecole des Mines de Nantes, Nantes (France); Castanier, B. [IRCCyN/Ecole des Mines de Nantes, Nantes (France)], E-mail: bruno.castanier@emn.fr; Berenguer, C. [Universite de Technologie de Troyes/CNRS, Troyes (France)

    2009-02-15

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters.

  4. Predictive maintenance policy for a gradually deteriorating system subject to stress

    International Nuclear Information System (INIS)

    Deloux, E.; Castanier, B.; Berenguer, C.

    2009-01-01

    This paper deals with a predictive maintenance policy for a continuously deteriorating system subject to stress. We consider a system with two failure mechanisms which are, respectively, due to an excessive deterioration level and a shock. To optimize the maintenance policy of the system, an approach combining statistical process control (SPC) and condition-based maintenance (CBM) is proposed. CBM policy is used to inspect and replace the system according to the observed deterioration level. SPC is used to monitor the stress covariate. In order to assess the performance of the proposed maintenance policy and to minimize the long-run expected maintenance cost per unit of time, a mathematical model for the maintained system cost is derived. Analysis based on numerical results are conducted to highlight the properties of the proposed maintenance policy in respect to the different maintenance parameters

  5. A Novel Idea for Optimizing Condition-Based Maintenance Using Genetic Algorithms and Continuous Event Simulation Techniques

    Directory of Open Access Journals (Sweden)

    Mansoor Ahmed Siddiqui

    2017-01-01

    Full Text Available Effective maintenance strategies are of utmost significance for system engineering due to their direct linkage with financial aspects and safety of the plants’ operation. At a point where the state of a system, for instance, level of its deterioration, can be constantly observed, a strategy based on condition-based maintenance (CBM may be affected; wherein upkeep of the system is done progressively on the premise of monitored state of the system. In this article, a multicomponent framework is considered that is continuously kept under observation. In order to decide an optimal deterioration stage for the said system, Genetic Algorithm (GA technique has been utilized that figures out when its preventive maintenance should be carried out. The system is configured into a multiobjective problem that is aimed at optimizing the two desired objectives, namely, profitability and accessibility. For the sake of reality, a prognostic model portraying the advancements of deteriorating system has been employed that will be based on utilization of continuous event simulation techniques. In this regard, Monte Carlo (MC simulation has been shortlisted as it can take into account a wide range of probable options that can help in reducing uncertainty. The inherent benefits proffered by the said simulation technique are fully utilized to display various elements of a deteriorating system working under stressed environment. The proposed synergic model (GA and MC is considered to be more effective due to the employment of “drop-by-drop approach” that permits successful drive of the related search process with regard to the best optimal solutions.

  6. e-Learning Content Design for Corrective Maintenance of Toshiba BMC 80.5 based on Knowledge Conversion using SECI Method: A Case Study in Aerospace Company

    Science.gov (United States)

    Permata Shabrina, Ayu; Pramuditya Soesanto, Rayinda; Kurniawati, Amelia; Teguh Kurniawan, Mochamad; Andrawina, Luciana

    2018-03-01

    Knowledge is a combination of experience, value, and information that is based on the intuition that allows an organization to evaluate and combine new information. In an organization, knowledge is not only attached to document but also in routine value creating activities, therefore knowledge is an important asset for the organization. X Corp is a company that focused on manufacturing aerospace components. In carrying out the production process, the company is supported by various machines, one of the machines is Toshiba BMC 80.5. The machine is used occasionally and therefore maintenance activity is needed, especially corrective maintenance. Corrective maintenance is done to make a breakdown machine back to work. Corrective maintenance is done by maintenance operator whose retirement year is close. The long term experience of the maintenance operator needs to be captured by the organization and shared across maintenance division. E-learning is one type of media that can support and assist knowledge sharing. This research purpose is to create the e-learning content for best practice of corrective maintenance activity for Toshiba BMC 80.5 by extracting the knowledge and experience from the operator based on knowledge conversion using SECI method. The knowledge source in this research is a maintenance supervisor and a senior maintenance engineer. From the evaluation of the e-learning content, it is known that the average test score of the respondents who use the e-learning increases from 77.5 to 87.5.

  7. Risk-Based Operation and Maintenance of Offshore Wind Turbines using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2011-01-01

    the lifetime. Two different approaches are used; one uses a threshold value of the failure probability, and one uses a Limited Memory Influence Diagram. Both methods are tested for an application example using MonteCarlo sampling, and they are both found to be efficient and equally good.......For offshore wind farms, the costs due to operation and maintenance are large, and more optimal planning has the potential of reducing these costs. This paper presents how Bayesian networks can be used for risk-based inspection planning, where the inspection plans are updated each year through...

  8. VEHICLE REPAIR AND MAINTENANCE COSTS IN NIGERIA ...

    African Journals Online (AJOL)

    A standard model was established for the prediction of repair and maintenance costs of vehicles in a non-profit making government parastatal. The model was derived based on data collected over a ten year period from a non-profit making government parastatal, and it predicts repair and maintenance costs as a linear ...

  9. Reliability assessment of power pole infrastructure incorporating deterioration and network maintenance

    International Nuclear Information System (INIS)

    Ryan, Paraic C.; Stewart, Mark G.; Spencer, Nathan; Li, Yue

    2014-01-01

    There is considerable investment in timber utility poles worldwide, and there is a need to examine the structural reliability and probability based management optimisation of these power distribution infrastructure elements. The work presented in this paper builds on the existing studies in this area through assessment of both treated and untreated timber power poles, with the effects of deterioration and network maintenance incorporated in the analysis. This more realistic assessment approach, with deterioration and maintenance considered, was achieved using event-based Monte Carlo simulation. The output from the probabilistic model is used to illustrate the importance of considering network maintenance in the time-dependent structural reliability assessment of timber power poles. Under wind load, treated and untreated poles designed and maintained in accordance with existing Australian standards were found to have similar failure rates. However, untreated pole networks required approximately twice as many maintenance based pole replacements to sustain the same level of reliability. The effect of four different network maintenance strategies on infrastructure performance was also investigated herein. This assessment highlighted the fact that slight alterations to network maintenance practices can lead to significant changes in performance of timber power pole networks. - Highlights: • A time-dependent structural reliability model was developed for timber power poles. • Deterioration and network maintenance were incorporated into this event based model. • Network maintenance had a significant impact on power pole wind vulnerability. • Treated and untreated poles designed to Australian standards had similar reliability. • Minor alterations to maintenance strategies had large effects on network performance

  10. A concept of distributed architecture for maintenance robot systems

    International Nuclear Information System (INIS)

    Asama, Hajime

    1990-01-01

    Aiming at development of a robot system for maintenance tasks in nuclear power plants, a concept of distributed architecture for autonomous robot systems is discussed. At first, based on investigation of maintenance tasks, requirements for maintenance robots are introduced, and structures to realize multi-functions are discussed. Then, as a new design strategy of maintenance robot system, an autonomous and decentralized robot systems is proposed, which is composed of multiple robots, computers, and equipments, and concept of ACTRESS (ACTor-based Robots and Equipments Synthetic System) including communication framework between robotic components is designed. Finally, as a model of ACTRESS, a experimental system is developed, which deals with object-pushing tasks by two micromice and an environment modeler with communicating with each other. Both of parallel independent motion and cooperative motion based on communication is reconciled, and the efficiency of the distributed architecture is verified. (author)

  11. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  12. Human factor analysis and preventive countermeasures of maintenance in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Hu Chao

    2008-01-01

    Based on the human error analysis theory and the characteristics of maintenance in a nuclear power plant, human factors of maintenance in NPP are divided into three different areas: human, technology, and organization, in which human refers to the individual factors, mainly including psychological quality, physiological characteristic, state of health, knowledge, skill level, and interpersonal relationship. Technology includes the maintenance technology, maintenance strategy, maintenance tool, maintenance interface, maintenance regulation, and work environment. Organization includes task arrangement, information communication, training, personnel external environment, team construction, and leadership. The analysis also reveals that the organization factors, which can indirectly influence personnel performance, are the primary initiators of human error. Based on these, some countermeasures are brought forward in order to reduce human errors. (authors)

  13. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  14. Implementing a Reliability Centered Maintenance Program at NASA's Kennedy Space Center

    National Research Council Canada - National Science Library

    Tuttle, Raymond

    1998-01-01

    .... A reliability centered maintenance (RCM) program seeks to offer equal or greater reliability at decreased cost by insuring only applicable, effective maintenance is performed and by in large part replacing time based maintenance...

  15. Probabilistic methods for maintenance program optimization

    International Nuclear Information System (INIS)

    Liming, J.K.; Smith, M.J.; Gekler, W.C.

    1989-01-01

    In today's regulatory and economic environments, it is more important than ever that managers, engineers, and plant staff join together in developing and implementing effective management plans for safety and economic risk. This need applied to both power generating stations and other process facilities. One of the most critical parts of these management plans is the development and continuous enhancement of a maintenance program that optimizes plant or facility safety and profitability. The ultimate objective is to maximize the potential for station or facility success, usually measured in terms of projected financial profitability, while meeting or exceeding meaningful and reasonable safety goals, usually measured in terms of projected damage or consequence frequencies. This paper describes the use of the latest concepts in developing and evaluating maintenance programs to achieve maintenance program optimization (MPO). These concepts are based on significant field experience gained through the integration and application of fundamentals developed for industry and Electric Power Research Institute (EPRI)-sponsored projects on preventive maintenance (PM) program development and reliability-centered maintenance (RCM)

  16. Maintenance care in chiropractic - what do we know?

    DEFF Research Database (Denmark)

    Leboeuf-Yde, Charlotte; Hestbæk, Lise

    2008-01-01

    of maintenance care are considered controversial. It is therefore relevant to investigate the scientific evidence forming the basis for its use. OBJECTIVES: A review of the literature was performed in order to obtain answers to the following questions: What is the exact definition of maintenance care, what...... any of the questions. CONCLUSION: There is no evidence-based definition of maintenance care and the indications for and nature of its use remains to be clearly stated. It is likely that many chiropractors believe in the usefulness of maintenance care but it seems to be less well accepted...

  17. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  18. Modelling inspection policies for building maintenance.

    Science.gov (United States)

    Christer, A H

    1982-08-01

    A method of assessing the potential of an inspection maintenance policy as opposed to an existing breakdown maintenance policy for a building complex is developed. The method is based upon information likely to be available and specific subjective assessments which could be made available. Estimates of the expected number of defects identified at an inspection and the consequential cost saving are presented as functions of the inspection frequency.

  19. Development of maintenance engineering system

    International Nuclear Information System (INIS)

    1995-03-01

    Department of JMTR project has developed the Maintenance Engineering System which evaluates the aging tendency of the facilities. The system is used for the repair plan and the replace period of parts, components, equipments or facilities. The system has the data-base which consists of the check data, the inspection data, the trouble data and the repair data at the JMTR since the virgin criticality. The system is utilized maintenance works and concludes the maintenance procedures for the failure components, equipments and facilities. This system has the following characteristics. (1) Anybody can operate the system as easily as word processor. (2) Data are put into by man-machine-interface. (3) The data sheets are with light color and the recognizable arrangements. (4) The system is cost-efficient using commercial personal computers and applications. The research card and the layouts of the input data sheet had been formatted. Data has been begun to be put into the system and to check its functions. The result demonstrates that the system is available for preventive maintenance at the JMTR. (author)

  20. Probabilistic approach to rationalization of plants maintenance

    International Nuclear Information System (INIS)

    Kasai, Masao; Notoya, Junichi; Uchimoto, Tetsuya; Miya, Kenzo

    2001-01-01

    Since there are a lot of equipments in large plants, their safety and reliability cannot be kept as high level as designed without maintenance activities. Then preventive maintenance is intensively executed in some large plants. However, it will be inefficient to perform the preventive maintenance blindly. To make maintenance activities effective, it is essential to identify the critical equipments influencing plant safety and/or reliability and carry out the maintenance by focusing attentions on these equipments. It needs quantitative analyses to identify the critical equipments based on the data of failure rates. However, complete data set of failure rates cannot necessarily be available for some plants such as nuclear power plants. In this study, we carry out the reliability analysis for generic LNG plant and calculate various quantitative risk importance measures for each equipment. We propose rather qualitative representations for some quantitative measures, considering the situation without complete data set and conclude that it is possible to rationalize maintenance procedure by using these rather qualitative measures, though the level of rationalization is of course limited. (author)

  1. A development of maintenance educational support method by using navigation method. Pt. 1. A conceptual design of RHR pump maintenance educational support prototype system

    International Nuclear Information System (INIS)

    Yoshino, Kenji; Hirotsu, Yuko; Fujimoto, Junzo; Gouda, Hidenori

    2001-01-01

    The purpose of this research is before hand prevention of the systematic error produced from the fault of command / command system on the different organization in a nuclear power plant, and the individual error of the demand level of maintenance work, and knowledge and experience level of a maintenance worker produced from it being incongruent (mismatch), and generating of the serious accident and a serious trouble. This research attains optimization with the difficulty of maintenance work, and work execution capability, such as the persons concerned (a supervision person, a construction person, work person), and proposes the new 'maintenance educational support technique' which is useful to the improvement in 'work reliability' and 'before hand prevention of a human error' in the maintenance work spot. The main results concerning this research are shown below. (1) In this research, concept design of RHR pump maintenance work educational support prototype system was performed on the basis of the examination result of a process analysis of RHR pump maintenance work, load mapping, a rule base/knowledge base and a data base/filing system. Consequently, when an educator-ed talked with a data base/filing system along with load mapping of maintenance work (Why, How, What), a possibility that it could reach exactly from work start to the sub goal or the last goal and timely was suggested. (2) As a result of classifying 'the difficulty of maintenance work', and man's work execution capability' and comparing the result using SRK (behavior of human) index which Rasmussen proposed, among both, it turns out that difference (inharmonious) arises. The exact presentation of the educational method or educational material which responded to knowledge and experience level of an educational achievement target or an educator-ed can be referred to as being connected with the improvement in work reliability, and before hand prevention of a human error as a result by then, incorporating

  2. Evaluation of In-House versus Contract Computer Hardware Maintenance

    International Nuclear Information System (INIS)

    Wright, H.P.

    1981-09-01

    The issue of In-House versus Contract Computer Hardware Maintenance is one which every organization who uses computers must resolve. This report discusses the advantages and disadvantages of both approaches to computer maintenance, the costs involved (based on the current AGNS computer inventory), and the AGNS maintenance experience to date. A recommendation on an appropriate approach for AGNS is made

  3. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  4. A Bayesian network based approach for integration of condition-based maintenance in strategic offshore wind farm O&M simulation models

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær; Sørensen, John Dalsgaard; Sperstad, Iver Bakken

    2018-01-01

    In the overall decision problem regarding optimization of operation and maintenance (O&M) for offshore wind farms, there are many approaches for solving parts of the overall decision problem. Simulation-based strategy models accurately capture system effects related to logistics, but model...... to generate failures and CBM tasks. An example considering CBM for wind turbine blades demonstrates the feasibility of the approach....

  5. 49 CFR 236.919 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.919 Operations and Maintenance Manual. (a... identify all software versions, revisions, and revision dates. Plans must be legible and correct. (c...

  6. Predictive maintenance of maritime systems : models and challenges

    NARCIS (Netherlands)

    Tinga, T.; Tiddens, W.W.; Amoiralis, F.; Politis, M.; Cepin, Marko; Bris, Radim

    2017-01-01

    To reduce maintenance and logistic costs and increase the asset availability, a predictive maintenance concept for maritime systems is developed. In the present paper, the physics-of-failure based prognostic methods will be introduced, but also other issues related to the development and application

  7. Modelo para determinar as exigências de proteína para poedeiras Modelling protein utilization in laying hens

    Directory of Open Access Journals (Sweden)

    Nilva Kazue Sakomura

    2002-11-01

    Full Text Available O objetivo do trabalho foi elaborar um modelo para estimar as exigências de proteína bruta (PB para poedeiras leves, usando o método fatorial. Para determinar as exigências de proteína bruta (PB para manutenção foi utilizada a técnica do balanço de nitrogênio. A exigência de proteína bruta para o ganho de peso foi determinada em função do conteúdo de nitrogênio na carcaça e a eficiência de utilização do nitrogênio da dieta. A exigência de PB, para produção de ovos, foi determinada considerando o teor de PB determinado nos ovos e a eficiência de deposição do nitrogênio no ovo. A partir dos valores das exigências para manutenção, para o ganho e produção foi elaborada uma equação para predizer as exigências diárias de PB (g/ ave/ dia para poedeiras: PB = 1,94. P0,75 + 0,48.G + 0,301.O, em que P = peso corporal (kg, G = ganho de peso diário (g/dia e O = massa de ovos produzida (g/ave/dia.The objective of this study was to determine a model for crude protein requirements (CP for laying hen by the factorial method. The protein maintenance requirement was determine by the nitrogen balance technique . The crude protein requirement for weight gain was determined based on body nitrogen content and nitrogen efficiency for body deposition. The crude protein requirement for egg production was determined based on the nitrogen content of eggs and nitrogen efficiency for egg deposition. Considering the requirements for maintenance, egg production and weight gain, it was elaborated a protein requirement model for laying hen: PB = 1.94xW.75 + 0.480xG + 0,301x E, where PB = requirement (g/bird/day, W = body weight (kg, G = daily weight gain (g/day and E = egg mass (g/bird/day.

  8. Data Base Development of Automobile and Light Truck Maintenance : Volume II. Appendix E.

    Science.gov (United States)

    1978-08-01

    The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...

  9. Data Base Development of Automobile and Light Truck Maintenance : Volume III. Appendix F.

    Science.gov (United States)

    1978-08-01

    The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...

  10. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    Science.gov (United States)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  11. Optimization of the preventive maintenance plan of a series components system

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Jose A. Caldeira [Mathematical Department, Instituto Politecnico de Setubal/Escola Superior de Tecnologia de Setubal, Campus do IPS, Estefanilha, 2914-508 Setubal (Portugal)]. E-mail: jduarte@est.ips.pt; Craveiro, Joao C. Taborda A. [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal); Trigo, Tomas Pedro [MIIT, Manutencao Industrial Informatizada e Tecnologia, Lda, Av. Elias Garcia, 123, 5o, Lisbon (Portugal)

    2006-04-15

    One of the most critical problems in preventive maintenance is the determination of the optimum frequency to perform preventive maintenance in equipment, in order to ensure its availability. In this paper, we propose an algorithm to solve the previous problem for equipment that exhibit linearly increasing hazard rate and constant repair rate. Based on this algorithm, we have developed another one to solve the problem of maintenance management of a series system based on preventive maintenance over the different system components. We assume that all components of the system still exhibit linearly increasing hazard rate and constant repair rate and that preventive maintenance would bring the system to the as good as new condition. We define a cost function for maintenance tasks (preventive and corrective) for the system. The algorithm calculates the interval of time between preventive maintenance actions for each component, minimizing the costs, and in such a way that the total downtime, in a certain period of time, does not exceed a predetermined value.

  12. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  13. A genetic algorithm solution for a nuclear power plant risk-cost maintenance model

    International Nuclear Information System (INIS)

    Tong Jiejuan; Mao Dingyuan; Xue Dazhi

    2004-01-01

    Reliability Centered Maintenance (RCM) is one of the popular maintenance optimization methods according to certain kinds of priorities. Traditional RCM usually analyzes and optimizes the maintenance strategy from the viewpoint of component instead of the whole maintenance program impact. Research presented in this paper is a pilot study using PSA techniques in RCM. How to reflect the effect on component unavailability by the maintenance activities such as surveillance testing and preventive maintenance in PSA model is discussed firstly. Based on the discussion, a maintenance risk-cost model is established for global maintenance optimization in a nuclear power plant, and a genetic algorithm (GA) is applied to solve such a model to get the global optimized maintenance strategy. Finally, the result got from a simple test case based on a risk-cost model consisting of 10 components is presented

  14. A CMMS Expert using BIM for IBS Building Maintenance

    Directory of Open Access Journals (Sweden)

    Hamzah Noraini

    2016-01-01

    Full Text Available In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

  15. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  16. Prognostics and Condition Based Maintenance: A New Approach to Precursive Metrics

    International Nuclear Information System (INIS)

    Jarrell, Donald B.; Sisk, Daniel R.; Bond, Leonard J.

    2002-01-01

    Scientists at the Pacific Northwest National Laboratory (PNNL) have examined the necessity for understanding and controlling the aging process of both safety-specific plant components and the infrastructure that supports these processes. In this paper we examine the preliminary development of aging precursor metrics and their correlation with degradation rate and projected machine failure. Degradation specific correlations are currently being developed at PNNL that will allow accurate physics-based diagnostic and prognostic determinations to be derived from a new view of condition based maintenance. This view, founded in root cause analysis, is focused on quantifying the primary stressor(s) responsible for degradation in the component of interest. The derivative relationship between the performance, degradation and the underlying stressor set is used to gain a first principles approach to prognostic determinations. The assumptions used for the design basis of process equipment have always been as much art as science and for this reason have been misused or relegated into obscurity in all but the nuclear industry. The ability to successfully link degradation and expected equipment life to stressor intensity level is valuable in that it quantifies the degree of machine stress for a given production level. This allows two major improvements in the O and M of process machinery: (1) the actual versus intended machine environment can be understood and brought into much better alignment, and (2) the end goal can define operations and maintenance strategies in terms of life cycle and economic management of plant assets. A holistic infrastructure approach, as applied through a CBM framework, will allow intelligent, automated diagnostic and prognostic programs to provide O and M practitioners with an understanding of the condition of their machinery today and an assurance of its operational state tomorrow

  17. No functional role of attention-based rehearsal in maintenance of spatial working memory representations.

    Science.gov (United States)

    Belopolsky, Artem V; Theeuwes, Jan

    2009-10-01

    The present study systematically examined the role of attention in maintenance of spatial representations in working memory as proposed by the attention-based rehearsal hypothesis [Awh, E., Jonides, J., & Reuter-Lorenz, P. A. (1998). Rehearsal in spatial working memory. Journal of Experimental Psychology--Human Perception and Performance, 24(3), 780-790]. Three main issues were examined. First, Experiments 1-3 demonstrated that inhibition and not facilitation of visual processing is often observed at the memorized location during the retention interval. This inhibition was caused by keeping a location in memory and not by the exogenous nature of the memory cue. Second, Experiment 4 showed that inhibition of the memorized location does not lead to any significant impairment in memory accuracy. Finally, Experiment 5 connected current results to the previous findings and demonstrated facilitation of processing at the memorized location. Importantly, facilitation of processing did not lead to more accurate memory performance. The present results challenge the functional role of attention in maintenance of spatial working memory representations.

  18. A framework for the design of a voice-activated, intelligent, and hypermedia-based aircraft maintenance manual

    Science.gov (United States)

    Patankar, Manoj Shashikant

    Federal Aviation Regulations require Aviation Maintenance Technicians (AMTs) to refer to approved maintenance manuals when performing maintenance on airworthy aircraft. Because these manuals are paper-based, larger the size of the aircraft, more cumbersome are the manuals. Federal Aviation Administration (FAA) recognized the difficulties associated with the use of large manuals and conducted studies on the use of electronic media as an alternative to the traditional paper format. However, these techniques do not employ any artificial intelligence technologies and the user interface is limited to either a keyboard or a stylus pen. The primary emphasis of this research was to design a generic framework that would allow future development of voice-activated, intelligent, and hypermedia-based aircraft maintenance manuals. A prototype (VIHAMS-Voice-activated, Intelligent, and Hypermedia-based Aircraft Maintenance System) was developed, as a secondary emphasis, using the design and development techniques that evolved from this research. An evolutionary software design approach was used to design the proposed framework and the structured rapid prototyping technique was used to produce the VIHAMS prototype. VoiceAssist by Creative Labs was used to provide the voice interface so that the users (AMTs) could keep their hands free to work on the aircraft while maintaining complete control over the computer through discrete voice commands. KnowledgePro for Windows sp{TM}, an expert system shell, provided "intelligence" to the prototype. As a result of this intelligence, the system provided expert guidance to the user. The core information contained in conventional manuals was available in a hypermedia format. The prototype's operating hardware included a notebook computer with a fully functional audio system. An external microphone and the built-in speaker served as the input and output devices (along with the color monitor), respectively. Federal Aviation Administration

  19. The missing link between maintenance contracts and flexible asset management

    OpenAIRE

    Marttonen-Arola, Salla; Viskari, Sari; Kärri, Timo

    2013-01-01

    The paper shows how additional value can be created in maintenance collaboration through integrating the features of flexible asset management into maintenance contracts. We expand the traditional typology of maintenance contracts and introduce a new contract type, flexible asset management contracts. Also value sharing in the new contract type is discussed. Our logic for sharing the value is based on reaching for win-win situations in industrial maintenance collaboration. Finally, we present...

  20. Maintenance of algal endosymbionts in Paramecium bursaria: a simple model based on population dynamics.

    Science.gov (United States)

    Iwai, Sosuke; Fujiwara, Kenji; Tamura, Takuro

    2016-09-01

    Algal endosymbiosis is widely distributed in eukaryotes including many protists and metazoans, and plays important roles in aquatic ecosystems, combining phagotrophy and phototrophy. To maintain a stable symbiotic relationship, endosymbiont population size in the host must be properly regulated and maintained at a constant level; however, the mechanisms underlying the maintenance of algal endosymbionts are still largely unknown. Here we investigate the population dynamics of the unicellular ciliate Paramecium bursaria and its Chlorella-like algal endosymbiont under various experimental conditions in a simple culture system. Our results suggest that endosymbiont population size in P. bursaria was not regulated by active processes such as cell division coupling between the two organisms, or partitioning of the endosymbionts at host cell division. Regardless, endosymbiont population size was eventually adjusted to a nearly constant level once cells were grown with light and nutrients. To explain this apparent regulation of population size, we propose a simple mechanism based on the different growth properties (specifically the nutrient requirements) of the two organisms, and based from this develop a mathematical model to describe the population dynamics of host and endosymbiont. The proposed mechanism and model may provide a basis for understanding the maintenance of algal endosymbionts. © 2015 Society for Applied Microbiology and John Wiley & Sons Ltd.

  1. Improving the development, use and control of maintenance procedures

    International Nuclear Information System (INIS)

    Morgenstern, M.H.; Barnes, V.E.; Radford, L.R.; Wheeler, W.A.; Badalamente, R.V.

    1985-12-01

    This paper describes the results of a project conducted for the US Nuclear Regulatory Commission (NRC) to assess and document the need for guidance or regulatory involvement by the NRC in the development, upgrading, use and control of maintenance procedures in US nuclear power plants. Presented are the findings of the following activities: (1) a survey of current maintenance procedure practices in seven US nuclear power plants; (2) a review and analysis of plant administrative and maintenance procedures; (3) a survey of maintenance procedure practices in industries that share some characteristics with the nuclear industry; and (4) a review of the research pertaining to job performance aids and a brief analysis of their applicability to maintenance in nuclear power plants. Based on these findings, several recommendations to upgrade maintenance procedures are offered

  2. Efeito do consumo de erva-mate (Ilex paraguariensis sobre o ganho de peso e a glicemia de jejum em ratos alimentados com uma dieta hiperlipídica = Effect of yerba mate (Ilex paraguariensis consumption on weight gain and fasting glucose in rats fed with a high-fat diet

    Directory of Open Access Journals (Sweden)

    Machado, Alisson Diego

    2014-01-01

    Full Text Available Objetivo: Avaliar o efeito do consumo de erva-mate sobre o ganho de peso e a glicemia de jejum em ratos alimentados com uma dieta hiperlipídica. Materiais e Métodos: Foram utilizados 14 ratos divididos em três grupos. O primeiro grupo (n=4 foi alimentado com ração comercial para ratos, o segundo (n=5 recebeu dieta hiperlipídica e o terceiro (n=5 foi alimentado com dieta hiperlipídica acrescida de infusão de erva-mate, durante 24 dias. Durante o estudo foram monitorados o peso e o índice de Lee e ao final a glicemia de jejum. Resultados: Os ratos alimentados com dieta hiperlipídica contendo infusão de erva-mate apresentaram menor ganho de peso em relação aos que consumiram apenas a ração hiperlipídica, nos três períodos experimentais analisados (p=0,048, p=0,016 e p=0,048, respectivamente. Não houve diferença significativa em relação ao índice de Lee entre os grupos. O consumo da erva-mate promoveu tendência a menores níveis de glicemia de jejum em relação ao grupo alimentado com dieta comercial (p=0,056 e ao grupo que recebeu dieta hiperlipídica (p=0,075. Conclusão: O consumo de erva-mate proporcionou menor ganho de peso em relação aos ratos que foram alimentados apenas com ração hiperlipídica e tendência a menores níveis de glicemia de jejum

  3. Elements of a total MOV maintenance program

    International Nuclear Information System (INIS)

    Lavallee, W.L.

    1989-01-01

    Establishing a good preventive and predictive maintenance program for motor-operated valves (MOVs) is an especially challenging task for nuclear power plants. Because of the sheer number of MOVs involved, all with somewhat different characteristics and requirements, and the extremely critical functions that some of the MOVs perform, the maintenance program quickly becomes a major exercise in coordination. This paper outlines a three-phase approach to achieving a comprehensive MOV maintenance program. It is based on experience in assisting nuclear plants with their MOV programs and encountering many of the pitfalls that can hamper these programs. The three phases include up-front engineering preparation, field diagnostic testing, and maintenance follow-up and trending. Each of these phases is discussed, and a flowchart describing the individual elements of each phase is provided

  4. Contribution to the Optimization of Strategy of Maintenance by Lean Six Sigma

    Science.gov (United States)

    Youssouf, Ayadi; Rachid, Chaib; Ion, Verzea

    The efficiency of the maintenance of the industrial systems is a major economic stake for their business concern. The main difficulties and the sources of ineffectiveness live in the choice of the actions of maintenance especially when the machine plays a vital role in the process of production. But as Algeria has embarked on major infrastructure projects in transport, housing, automobile, manufacturing industry and construction (factories, housing, highway, subway, tram, etc.) requiring new implications on maintenance strategies that meet industry requirements imposed by the exploitation. From then on and seen the importance of the maintenance on the economic market and sound impacts on the performances of the installations, methods of optimization were developed. For this purpose, to ensure the survival of businesses, be credible, contributing and competitive in the market, maintenance services must continually adapt to the progress of technical areas, technological and organizational even help maintenance managers to construct or to modify maintenance strategies, objective of this work. Our contribution in this work focuses on the optimization of maintenance for industrial systems by the use of Lean six Sigma bases. Lean Six Sigma is a method of improving the quality and profitability based on mastering statically of process and it is also a management style that based on a highly regulated organization dedicated to managing project. The method is based on five main steps summarized in the acronym (DMAIC): Define Measure, Analyze, Improve and Control. Application of the method on the maintenance processes with using maintenance methods during the five phases of the method will help to reduce costs and losses in order to strive for optimum results in terms of profit and quality.

  5. Assessment and improvement of urban streets maintenance: Case study Kragujevac

    Directory of Open Access Journals (Sweden)

    Jokanović Igor

    2017-01-01

    Full Text Available City of Kragujevac struggles with providing road maintenance services due to limited funds and low capacity within the existing Public Utility Companies. As a solution to problems with traditional methods of contracting, many road authorities have moved to contracting road maintenance works to the private sector based on performance measures. The paper presents the outcomes of the study conducted for the purpose of improving current practice and condition of urban network within the City of Kragujevac through the application of performance-based maintenance contracting.

  6. Maintenance Management Support Systems for component aging estimation at nuclear power plants

    International Nuclear Information System (INIS)

    Shimizu, Shunichi; Ando, Yasumasa; Morioka, Toshihiko; Okuzumi, Naoaki

    1991-01-01

    Maintenance Management Support Systems (MMSSs) for nuclear power plants have been developed using component aging estimation methods and decision tree analysis for maintenance planning. The former evaluates actual component reliability through statistical analysis on field maintenance data. The latter provides preventive maintenance (PM) planning guidance using heuristic expert knowledge and estimated reliability parameters. The following aspects have been investigated: (1) A systematic and effective method of managing components/parts design information and field maintenance data (2) A method for estimating component aging based on a statistical analysis of field maintenance data (3) A method for providing PM planning guidance using estimated component reliability/performance parameters and decision tree analysis. Based on these investigations, two MMSSs were developed. One deals with 'general maintenance data', which are common to all component types and are amenable to common data handling. The other system deals with 'specific maintenance data', which are specific to an individual component type. Both systems provide PM planning guidance for PM cycles propriety and the PM work priority. The function of these systems were verified using simulated maintenance data. (author)

  7. Composição corporal e exigências líquidas de macroelementos inorgânicos (Ca, P, Mg e K para ganho de peso de bezerros machos de origem leiteira do nascimento aos 110 dias de idade

    Directory of Open Access Journals (Sweden)

    Carvalho Paulo Afonso

    2003-01-01

    Full Text Available O presente estudo foi conduzido para avaliar as mudanças na composição corporal e estudar as exigências líquidas de matéria mineral total (MM, cálcio (Ca, fósforo (P, magnésio (Mg e potássio (K para ganho de peso de corpo vazio (GPCVZ e ganho de peso vivo (GPV de bezerros do nascimento até os 110 dias de idade. Foram usados 18 bezerros da raça Holandês, machos, não castrados, pesando entre 30 e 100 kg. Seis animais foram abatidos ao nascimento, seis aos 50 dias e seis aos 110 dias de idade. Foram ajustadas equações de regressão do logaritmo da quantidade de MM, Ca, P, Mg e K retidos no corpo, em função do logaritmo do peso de corpo vazio (PCVZ. As exigências líquidas dos macroelementos para ganho de peso foram obtidas por derivação das equações de predição da composição corporal. Ocorreu acréscimo na concentração de todos macroelementos no PCVZ e no GPCVZ do nascimento aos 110 dias de vida, entretanto, as exigências destes elementos para GPV decresceram neste mesmo período. As exigências líquidas para 1 kg de GPCVZ, para o intervalo de PCVZ de 27,57 a 74,27 kg, variaram de 69,76 a 74,33 g para MM; 24,24 a 24,67 g para o Ca; 14,64 a 16,06 g para o P; 0,48 a 0,53 g para o Mg e de 3,18 a 3,61 g para o K. As exigências líquidas para 1 kg de GPV, para o intervalo de PV de 30 a 100 kg, variaram de 63,37 a 55,20 g para MM; 22,02 a 18,32 g para o Ca; 13,30 a 11,93 g para o P; 0,44 a 0,39 g para o Mg e de 2,89 a 2,68 g para o K.

  8. With a re-engineering of maintenance to a profitably oriented maintenance

    International Nuclear Information System (INIS)

    Angelevska, Silvana; Jolevski, Tome

    2000-01-01

    This paper presents an overview of effectiveness of the profit centered maintenance as a contemporary way of the maintenance management concept. Such redesign of a maintenance procedure results in significant gains in cost reduction and increase of the profitability and competitiveness of energy. The business process re engineering - a modern management control theory that is important aspect of the profit centered maintenance is summarized

  9. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  10. Payment mechanisms for winter road maintenance services

    Directory of Open Access Journals (Sweden)

    Adel Abdi

    2013-12-01

    Full Text Available In countries with severe winters a major part of the annual budget for road maintenance is allocated on performance of winter road maintenance tasks. Finding appropriate remuneration forms to compensate entrepreneurs for performed road measures during winter is not an easy task in order to minimise or eliminate disputes and satisfy both client organisations and contractors. On the other hand improper reimbursement models lead either to the client’s annual budget imbalance due to unnecessary cost overruns or affect contractor’s cash-flow. Such cases in turn affect just-in-time winter road maintenance and then traffic safety. To solve such problems, a number of countries in cold regions like Sweden have developed different remuneration models based more on weather data called Weather Index. Therefore the objective of this paper is to investigate and evaluate the payment models applied in Sweden. The study uses a number of approaches namely; domestic questionnaire survey, analysis of a number of contract documents, a series of meetings with the project managers and an international benchmarking. The study recognised four remuneration models for winter maintenance service of which one based on weather data statistics. The study reveals the payment model based on weather data statistics is only applied for the roads with higher traffic flow and the model generates most uncertainty.

  11. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  12. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  13. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  14. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  15. Pavement maintenance procedures with and without milling materials

    Directory of Open Access Journals (Sweden)

    Rafiqul A. Tarefder

    2016-01-01

    Full Text Available This study evaluates maintenance treatment followed by different Districts of New Mexico Department of Transportation (NMDOT. In addition, two case studies on the use of old pavement materials, called the “millings”, in maintenance projects are reported. Based on this study, it is observed that none of the Districts have a written procedure for maintenance work. Rather Districts rely on the experience of the maintenance crew for conducting maintenance projects. All Districts prefer to use chip seal for maintenance irrespective of distress conditions of the pavements. Patching and crack sealing are usually done before chip sealing to extend the life of the chip seals. Sand seal, scrub seal, and slurry seal projects are not done by District maintenance crews but by outside contractors. It is also observed that all Districts are interested in using millings in maintenance projects and most have already used millings in at least one maintenance project with some success and failure. Most of the Districts have used coarse fraction of millings in chip seal projects successfully. However, they failed to find a proper way to process the fine fractions of millings. Case Study I shows that fine millings can be used to construct thin overlay when mixed with emulsion in pug mill or hot drums. Case Study II concludes that fine millings can be used as fine/sand seal successfully following the same procedure and using the same equipment as chip seal. Keywords: Millings, Maintenance, Emulsion, Rutting, Pug-mill

  16. Pavement maintenance optimization model using Markov Decision Processes

    Science.gov (United States)

    Mandiartha, P.; Duffield, C. F.; Razelan, I. S. b. M.; Ismail, A. b. H.

    2017-09-01

    This paper presents an optimization model for selection of pavement maintenance intervention using a theory of Markov Decision Processes (MDP). There are some particular characteristics of the MDP developed in this paper which distinguish it from other similar studies or optimization models intended for pavement maintenance policy development. These unique characteristics include a direct inclusion of constraints into the formulation of MDP, the use of an average cost method of MDP, and the policy development process based on the dual linear programming solution. The limited information or discussions that are available on these matters in terms of stochastic based optimization model in road network management motivates this study. This paper uses a data set acquired from road authorities of state of Victoria, Australia, to test the model and recommends steps in the computation of MDP based stochastic optimization model, leading to the development of optimum pavement maintenance policy.

  17. Maintenance in sustainable manufacturing

    Directory of Open Access Journals (Sweden)

    Vladimir Stuchly

    2014-09-01

    Full Text Available Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will be needed in the future. This new approach forces manufacturing companies to change their previous management paradigms. New management paradigm should include new issues and develop innovative methods, practices and technologies striving for solving problem of shortages of resources, softening environment overload and enabling development of environment-friendly lifecycle of products. Hence, its realization requires updating existing production models as they are based on previously accepted paradigm of unlimited resources and unlimited regeneration capabilities. Maintenance plays a crucial role because of its impact on availability, reliability, quality and life cycle cost, thus it should be one of the main pillars of new business running model.  Material and methods: The following paper is a result of research on the literature and observation of practices undertaken by a company within maintenance area. Results and conclusions: The main message is that considering sustainable manufacturing requires considerable expanding range of analysis and focusing on supporting processes. Maintenance offers numerous opportunities of decreasing influence of business processes on natural environment and more efficient resources utilization. The goal of maintenance processes realizing sustainable development strategy is increased profitability of exploitation and optimization of total lifecycle cost without disturbing safety and environmental issues. 

  18. Development of optical fiber cable's inspection technology and maintenance criteria

    International Nuclear Information System (INIS)

    Kim, Min-Su; Ju, Hee-Wan; Shim, Seon-Heum; Lee, Youn-Ki; Kim, Jin-Il; Huh, Tae-Young

    2008-01-01

    Improve the reliability and establish the systematic maintenance methods for the digital control facilities' optical fiber cable, reviewed the technical requirements and the current maintenance procedures, analyzed the optical fiber cable's characteristics through actual test like bending, tension, attenuation. Based on the results of review, test and analysis, prepared the maintenance criteria and standard maintenance guideline. Also we verified those can be applied directly to the operating nuclear power plant through the actual test at Ulchin Unit 6. The details of test and analysis are presented in this paper. Also introduce the contents of maintenance criteria and guidelines

  19. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  20. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  1. Multi-objective group scheduling optimization integrated with preventive maintenance

    Science.gov (United States)

    Liao, Wenzhu; Zhang, Xiufang; Jiang, Min

    2017-11-01

    This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.

  2. Application of guideline for the maintenance of guide tubes

    International Nuclear Information System (INIS)

    Matsubara, Toru

    2009-01-01

    Control Rod Cluster Guide Tubes (GTs) in PWR nuclear plant have the possibility to be worn due to fluid induced vibration of Control Rod Clusters. The maintenance rules for GTs had been established after the discussion with experts, and GTs in Japanese PWR plants have been already maintained in accordance with these maintenance rules. In these rules, the inspection period is decided based on the wear data and the wear progressing prediction with the assumption of constant wear speed. This paper describes the validity of the concepts about maintenance period based on the wear progressing prediction, by using the consecutive inspection data of actual plants. (author)

  3. Preventive Maintenance Optimization in Healthcare Domain: Status of Research and Perspective

    OpenAIRE

    Mahfoud, H.; El Barkany, A.; El Biyaali, A.

    2016-01-01

    Although medical equipment maintenance has been carefully managed for years, very few in-depth studies have been conducted to evaluate the effectiveness and efficiency of these implemented preventive maintenance strategies, especially after the debate about the credibility of manufacturer’s recommendations has increased in the clinical engineering community. Facing the dilemma of merely following manufactures maintenance manual or establishing an evidence-based maintenance, medical equipment ...

  4. Wireless sensors for predictive maintenance of rotating equipment in research reactors

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    In 2008-2009, the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) tested the potential of predictive or condition-based maintenance techniques to reduce maintenance costs, minimize the risk of catastrophic failures, and maximize system availability by attaching wireless-based sensors to selected rotating equipment at HFIR. Rotating equipment is an ideal 'test case' for the viability of integrated, online predictive maintenance strategies because motors, bearings, and shafts are ubiquitous in nuclear power plants and because the maintenance methods typically performed on rotating equipment today (such as portable or handheld vibration data collection equipment) are highly labor-intensive. The HFIR project achieved all five of its objectives: (1) to identify rotating machinery of the types used in research reactors and determine their operational characteristics, degradation mechanisms, and failure modes, (2) to establish a predictive maintenance program for rotating equipment in research reactors, (3) to identify wireless sensors that are suitable for predictive maintenance of rotating machinery and test them in a laboratory setting, (4) to establish the requirements and procedures to be followed when implementing wireless sensors for predictive maintenance in research reactors, and (5) to develop a conceptual design for a predictive maintenance system for research reactors based on wireless sensors. The project demonstrated that wireless sensors offer an effective method for monitoring key process conditions continuously and remotely, thereby enhancing the safety, reliability, and efficiency of the aging research reactor fleet.

  5. Competence within Maintenance

    OpenAIRE

    Nerland, Annette Smørholm

    2010-01-01

    Maintenance can be a contributing factor to unwanted events, as well as desired events and states. Human competence can be defined as the ability to perform a specific task, action or function successfully, and is therefore a key factor to proper execution of maintenance tasks. Hence,maintenance will have negative consequences if done wrong, and give positive results when done right. The purpose of this report is to study the many aspects of maintenance competence. Endeavoring to improve ...

  6. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  7. Plant Maintenance. The Licensee's Viewpoint

    Energy Technology Data Exchange (ETDEWEB)

    Ungi, T. [Heysham 2 Power Station, Nuclear Electric LTD (United Kingdom)

    1997-07-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  8. Optimizing preventive maintenance policy: A data-driven application for a light rail braking system.

    Science.gov (United States)

    Corman, Francesco; Kraijema, Sander; Godjevac, Milinko; Lodewijks, Gabriel

    2017-10-01

    This article presents a case study determining the optimal preventive maintenance policy for a light rail rolling stock system in terms of reliability, availability, and maintenance costs. The maintenance policy defines one of the three predefined preventive maintenance actions at fixed time-based intervals for each of the subsystems of the braking system. Based on work, maintenance, and failure data, we model the reliability degradation of the system and its subsystems under the current maintenance policy by a Weibull distribution. We then analytically determine the relation between reliability, availability, and maintenance costs. We validate the model against recorded reliability and availability and get further insights by a dedicated sensitivity analysis. The model is then used in a sequential optimization framework determining preventive maintenance intervals to improve on the key performance indicators. We show the potential of data-driven modelling to determine optimal maintenance policy: same system availability and reliability can be achieved with 30% maintenance cost reduction, by prolonging the intervals and re-grouping maintenance actions.

  9. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    OpenAIRE

    Orlando Duran; Andrea Capaldo; Paulo Andrés Duran Acevedo

    2017-01-01

    Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despi...

  10. A preventive maintenance model with a two-level inspection policy based on a three-stage failure process

    International Nuclear Information System (INIS)

    Wang, Wenbin; Zhao, Fei; Peng, Rui

    2014-01-01

    Inspection is always an important preventive maintenance (PM) activity and can have different depths and cover all or part of plant systems. This paper introduces a two-level inspection policy model for a single component plant system based on a three-stage failure process. Such a failure process divides the system′s life into three stages: good, minor defective and severe defective stages. The first level of inspection, the minor inspection, can only identify the minor defective stage with a certain probability, but can always reveal the severe defective stage. The major inspection can however identify both defective stages perfectly. Once the system is found to be in the minor defective stage, a shortened inspection interval is adopted. If however the system is found to be in the severe defective stage, we may delay the maintenance action if the time to the next planned PM window is less than a threshold level, but otherwise, replace immediately. This corresponds to the well adopted maintenance policy in practice such as periodic inspections with planned PMs. A numerical example is presented to demonstrate the proposed model by comparing with other models. - Highlights: • The system′s deterioration goes through a three-stage process, namely, normal, minor defective and severe defective. • Two levels of inspections are proposed, e.g., minor and major inspections. • Once the minor defective stage is found, instead of taking a maintenance action, a shortened inspection interval is recommended. • When the severe defective stage is found, we delay the maintenance according to the threshold to the next PM. • The decision variables are the inspection intervals and the threshold to PM

  11. AN OPTIMAL MAINTENANCE MANAGEMENT MODEL FOR AIRPORT CONCRETE PAVEMENT

    Science.gov (United States)

    Shimomura, Taizo; Fujimori, Yuji; Kaito, Kiyoyuki; Obama, Kengo; Kobayashi, Kiyoshi

    In this paper, an optimal management model is formulated for the performance-based rehabilitation/maintenance contract for airport concrete pavement, whereby two types of life cycle cost risks, i.e., ground consolidation risk and concrete depreciation risk, are explicitly considered. The non-homogenous Markov chain model is formulated to represent the deterioration processes of concrete pavement which are conditional upon the ground consolidation processes. The optimal non-homogenous Markov decision model with multiple types of risk is presented to design the optimal rehabilitation/maintenance plans. And the methodology to revise the optimal rehabilitation/maintenance plans based upon the monitoring data by the Bayesian up-to-dating rules. The validity of the methodology presented in this paper is examined based upon the case studies carried out for the H airport.

  12. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  13. Maintenance Implementation Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Stark, T.E.

    1992-10-01

    This Maintenance Implementation Plan (MIP) has been developed for the 222-S Laboratory at Hanford. It is based on assessments of the existing maintenance program to the requirements specified by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II, Change 3. The results of these assessments were evaluated to determine corrective actions required. The 222-S Laboratory is currently supporting the waste management, chemical processing, and environmental monitoring programs presently under Westinghouse Hanford Company (Westinghouse Hanford) responsibility. This is done through quality analytical and process chemistry services

  14. Reliability Assessment and Reliability-Based Inspection and Maintenance of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Ramirez, José Rangel

    actions are the most relevant and effective means of control of deterioration. The risk-based inspection planning methodology, based on Bayesian decision theory, represents an important tool to identify the suitable strategy to inspect and control the deterioration in structures such as offshore wind...... performance during the life cycle. The deterioration processes, such as fatigue and corrosion, are typically affecting offshore structural systems. This damage decreases the system performance and increases the risk of failure, thus not fulfilling the established safety criteria. Inspection and maintenance...... to their offshore location, no pollution risks and low human risks since they are unmanned. This allows the allocation of lower reliability level compared to e.g. oil & gas installations. With the incursion to water depths between 20 and 50 meters, the use of jacket and tripod structures represents a feasible...

  15. Mechatronics technology in predictive maintenance method

    Science.gov (United States)

    Majid, Nurul Afiqah A.; Muthalif, Asan G. A.

    2017-11-01

    This paper presents recent mechatronics technology that can help to implement predictive maintenance by combining intelligent and predictive maintenance instrument. Vibration Fault Simulation System (VFSS) is an example of mechatronics system. The focus of this study is the prediction on the use of critical machines to detect vibration. Vibration measurement is often used as the key indicator of the state of the machine. This paper shows the choice of the appropriate strategy in the vibration of diagnostic process of the mechanical system, especially rotating machines, in recognition of the failure during the working process. In this paper, the vibration signature analysis is implemented to detect faults in rotary machining that includes imbalance, mechanical looseness, bent shaft, misalignment, missing blade bearing fault, balancing mass and critical speed. In order to perform vibration signature analysis for rotating machinery faults, studies have been made on how mechatronics technology is used as predictive maintenance methods. Vibration Faults Simulation Rig (VFSR) is designed to simulate and understand faults signatures. These techniques are based on the processing of vibrational data in frequency-domain. The LabVIEW-based spectrum analyzer software is developed to acquire and extract frequency contents of faults signals. This system is successfully tested based on the unique vibration fault signatures that always occur in a rotating machinery.

  16. Analysis of the options - rationale for servomanipulator maintenance in future reprocessing plants

    International Nuclear Information System (INIS)

    Herndon, J.N.; Hamel, W.R.

    1984-04-01

    The currently available maintenance systems which can be applied, in various combinations, to large-volume in-cell maintenance operations are: (1) contact, (2) overhead cranes, (3) power manipulators, (4) mechanical master/slave manipulators, and (5) servomanipulators. The requirements for reprocessing plant maintenance are reviewed, and the capabilities of remote maintenance systems are described. A basic trade-off analysis of these remote maintenance systems considering reprocessing plant requirements is given. Justification is given for selecting the overhead crane/servomanipulator-based maintenance concept as the option most desirable for future large reprocessing plant maintenance. 23 references, 6 tables

  17. Crack Growth-Based Predictive Methodology for the Maintenance of the Structural Integrity of Repaired and Nonrepaired Aging Engine Stationary Components

    National Research Council Canada - National Science Library

    Barron, Michael

    1999-01-01

    .... Specifically, the FAA's goal was to develop "Crack Growth-Based Predictive Methodologies for the Maintenance of the Structural Integrity of Repaired and Nonrepaired Aging Engine Stationary Components...

  18. Housing management and maintenance practise of Dutch housing associations

    NARCIS (Netherlands)

    Straub, A.

    This paper summarises the state-of-the-art in housing management and maintenance practise of Dutch housing associations based on a survey conducted among almost all housing associations. We address the question what the current developments are in housing management and maintenance practice in the

  19. Intelligent control and maintenance of management integrated system based on multi-agents for coal preparation plant

    Energy Technology Data Exchange (ETDEWEB)

    Meng, F.; Wang, Y. [China University of Mining and technology, Xuzhou (China). School of Information and Electrical Engineering

    2006-06-15

    This paper discusses the progress of computer integrated processing (CIPS) of coal preparation and then presents an intelligence controlled production process, device-maintenance and production-management system of coal preparation based on multi-agents (IICMMS-CP). The construction of the IICMMS-CP, the distributed network control system based on live intelligence control stations and the strategy of implementing a distributed intelligence control system are studied in order to overcome the disadvantages brought about by the wide use of the PLC system by coal preparation plants. The software frame, based on a Multi-Agent Intelligence Control and Maintenance Management integrated system, is studied and the implementation methods of IICMMS-CP are discussed. The characteristics of distributed architecture, cooperation and parallel computing meet the needs of integrated control of coal preparation plants with large-scale spatial production distribution, densely-related processes and complex systems. Its application further improves the reliability and precision of process control, accuracy of fault identification and intelligence of production adjustment, establishes a technical basis for system integration and flexible production. The main function of the system has been tested in a coal preparation plant to good effect in stabilizing product quality, improving efficiency and reducing consumption. 17 refs., 4 figs.

  20. Development of diagnosis and maintenance support system for nuclear power plants with flexible inference function and knowledge base edition support function

    International Nuclear Information System (INIS)

    Fujii, Makoto; Seki, Eiji; Tai, Ichiro; Morioka, Toshihiko

    1988-01-01

    For the reliable and efficient diagnosis and inspection work of the nuclear power plant equipments, 'Diagnosis and Maintenance Support System' has been developed. This system has functions to assist operators or engineers to observe and evaluate equipment conditions based on the experts' knowledge. These functions are carried out through dialogue between the system and users. This system has two subsystems: diagnosis subsystem and knowledge base edition support subsystem. To achieve the functions of diagnosis subsystem, a new method of knowledge processing for equipment diagnosis is adopted. This method is based on the concept of 'Cause Generation and Checking'. Knowledge for diagnosis is represented with modularized production rules. And each rule module consists of four different type rules with hierarchical structure. With this approach, the system is equipped with sufficient performance not only in diagnosis function but also in flexible man-machine interface. Knowledge base edition support subsystem (Graphical Rule Editor) is provided for this system. This editor has functions to display and edit the contents of knowledge base with tree structures through the graphic display. With these functions, the efficiency of constructing expert system is highly improved. By applying this system to the maintenance support of neutron monitoring system, it is proved that this system has satisfactory performance as a diagnosis and maintenance support system. (author)

  1. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  2. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  3. PLC based control system and maintenance activities at NCAR, Bilaspur

    International Nuclear Information System (INIS)

    Dewangan, Jaidev; Trivedi, T.; Patel, Shiv P.; Malik, C.; Kumar, Rakesh; Gupta, Santosh Kumar; Bajpai, P.K.

    2015-01-01

    A 3.0 MV high current low energy Pelletron Accelerator facility (Model 9SDH-4, NEC, USA) with TORUIS (ion source for H + and He 2+ beam current H + ion ∼ 50μA @ 6 MeV, He 2+ at ∼ 10μA) and SNICS-II ion source for heavy ions has been commissioned as 'National Centre for Accelerator Based Research' in the Department of Pure and Applied Physics, Guru Ghasidas Vishwavidyalaya. In this paper, we detail out the control system developed and implemented at NCAR. The basic idea of controlling the machine is by providing the output signal through PLC to ACPC of accelerator using user interface points provided by the manufacturer. The PLC based system generates output signal once it receives the feedback signals from search and secure switches, door lock switches and scram switches interlocked with PLC. The output is controlled by ladder logic and is activated only when all the radiation monitors are in healthy state and outside radiations monitor having low radiation level. The details of control system and maintenance activities will be discussed in the paper

  4. A Situational Maintenance Model

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance.......An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance....

  5. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  6. Aircraft Maintenance Engineering: Factors Impacting Airlines E-Maintenance Technologies, Authoring and Illustrations

    Science.gov (United States)

    Karayianes, Frank

    The purpose of this research was to evaluate factors influencing acceptance and use of technologies in the field of aircraft maintenance authoring, graphics, and documentation. Maintenance engineering authors convert complex engineering used in aircraft production and transform that data using technology (tools) into usable technical publications data. While the current literature includes a large volume of research in technology acceptance in various domains of industry and business, the problem is that no such studies exist with respect to the aircraft maintenance engineering authoring, allowing any number of tools to be used and acceptance to be unsure. The study was based on theoretical approaches of the Technology Acceptance Model and the associated hypothesis related to eight research questions. A survey questionnaire was developed for data collection from a selected population of aircraft maintenance engineering authors. Data collected from 148 responses were exposed to a range of statistical methods and analyses. Analysis of data were performed within the structural equation model using exploratory factor analysis, confirmatory factor analysis, and a range of regression methods. The analyses generally provided results consistent with prior literature. Two survey questions yielded unexpected results contrary to similar studies. The relationship between prior experience and job level did not show a significant relationship with perceived usefulness or perceived ease of use. Other results included the significant relationship between Perceived Usefulness and Perceived Ease of Use with Technology acceptance. Recommendations include understanding how Technology Acceptance can be improved for the industry and the need for further research not covered to refine recommendations for technology acceptance related to the aviation industry.

  7. Study on Maintenance Personnel Development Plan For The Exported APR1400 Commissioning

    International Nuclear Information System (INIS)

    Cho, Sungbae; Kim, Jongdae; Jun, Hokwang; Hwang, Inok; Kang, Jaeyuel

    2012-01-01

    This paper indicates ways to develop maintenance personnel for the exported APR1400 commissioning. The exported APR1400 has not been experienced ay maintenance yet, and requirements for maintenance personnel have not been clarified yet. Based on sound maintenance experience, KEPCO Plant Service and Engineering Company (KEPCO KPS) has studied on maintenance training and career requirement to establish a development plan of the maintenance personnel for the exported nuclear power plant. By defining manpower and training requirement, and mobilization plan, we expect to secure reliability of the exported APR1400

  8. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  9. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  10. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  11. State-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-04-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system. 5 references, 8 figures

  12. Applying reliability centered maintenance analysis principles to inservice testing

    International Nuclear Information System (INIS)

    Flude, J.W.

    1994-01-01

    Federal regulations require nuclear power plants to use inservice test (IST) programs to ensure the operability of safety-related equipment. IST programs are based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements. Many of these plants also use Reliability Centered Maintenance (RCM) to optimize system maintenance. ASME Code requirements are hard to change. The process for requesting authority to use an alternate strategy is long and expensive. The difficulties of obtaining this authority make the use of RCM method on safety-related systems not cost effective. An ASME research task force on Risk Based Inservice Testing is investigating changing the Code. The change will allow plants to apply RCM methods to the problem of maintenance strategy selection for safety-related systems. The research task force is working closely with the Codes and Standards sections to develop a process related to the RCM process. Some day plants will be able to use this process to develop more efficient and safer maintenance strategies

  13. Decreasing inventory of a cement factory roller mill parts using reliability centered maintenance method

    Science.gov (United States)

    Witantyo; Rindiyah, Anita

    2018-03-01

    According to data from maintenance planning and control, it was obtained that highest inventory value is non-routine components. Maintenance components are components which procured based on maintenance activities. The problem happens because there is no synchronization between maintenance activities and the components required. Reliability Centered Maintenance method is used to overcome the problem by reevaluating maintenance activities required components. The case chosen is roller mill system because it has the highest unscheduled downtime record. Components required for each maintenance activities will be determined by its failure distribution, so the number of components needed could be predicted. Moreover, those components will be reclassified from routine component to be non-routine component, so the procurement could be carried out regularly. Based on the conducted analysis, failure happens in almost every maintenance task are classified to become scheduled on condition task, scheduled discard task, schedule restoration task and no schedule maintenance. From 87 used components for maintenance activities are evaluated and there 19 components that experience reclassification from non-routine components to routine components. Then the reliability and need of those components were calculated for one-year operation period. Based on this invention, it is suggested to change all of the components in overhaul activity to increase the reliability of roller mill system. Besides, the inventory system should follow maintenance schedule and the number of required components in maintenance activity so the value of procurement will be decreased and the reliability system will increase.

  14. A reliability-based maintenance technicians' workloads optimisation model with stochastic consideration

    Science.gov (United States)

    Ighravwe, D. E.; Oke, S. A.; Adebiyi, K. A.

    2016-06-01

    The growing interest in technicians' workloads research is probably associated with the recent surge in competition. This was prompted by unprecedented technological development that triggers changes in customer tastes and preferences for industrial goods. In a quest for business improvement, this worldwide intense competition in industries has stimulated theories and practical frameworks that seek to optimise performance in workplaces. In line with this drive, the present paper proposes an optimisation model which considers technicians' reliability that complements factory information obtained. The information used emerged from technicians' productivity and earned-values using the concept of multi-objective modelling approach. Since technicians are expected to carry out routine and stochastic maintenance work, we consider these workloads as constraints. The influence of training, fatigue and experiential knowledge of technicians on workload management was considered. These workloads were combined with maintenance policy in optimising reliability, productivity and earned-values using the goal programming approach. Practical datasets were utilised in studying the applicability of the proposed model in practice. It was observed that our model was able to generate information that practicing maintenance engineers can apply in making more informed decisions on technicians' management.

  15. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  16. Evaluation and comparison of alternative fleet-level selective maintenance models

    International Nuclear Information System (INIS)

    Schneider, Kellie; Richard Cassady, C.

    2015-01-01

    Fleet-level selective maintenance refers to the process of identifying the subset of maintenance actions to perform on a fleet of repairable systems when the maintenance resources allocated to the fleet are insufficient for performing all desirable maintenance actions. The original fleet-level selective maintenance model is designed to maximize the probability that all missions in a future set are completed successfully. We extend this model in several ways. First, we consider a cost-based optimization model and show that a special case of this model maximizes the expected value of the number of successful missions in the future set. We also consider the situation in which one or more of the future missions may be canceled. These models and the original fleet-level selective maintenance optimization models are nonlinear. Therefore, we also consider an alternative model in which the objective function can be linearized. We show that the alternative model is a good approximation to the other models. - Highlights: • Investigate nonlinear fleet-level selective maintenance optimization models. • A cost based model is used to maximize the expected number of successful missions. • Another model is allowed to cancel missions if reliability is sufficiently low. • An alternative model has an objective function that can be linearized. • We show that the alternative model is a good approximation to the other models

  17. Eficiência de utilização da energia metabolizável para ganho de peso e exigências de energia metabolizável e nutrientes digestíveis totais de bovinos F1 Simental x Nelore Efficiency of metabolizable energy utilization for weight gain and requirements of metabolizable energy and total digestible nutrients in F1 Simental x Nellore bulls

    Directory of Open Access Journals (Sweden)

    Marcelo de Andrade Ferreira

    1999-04-01

    Full Text Available O objetivo deste trabalho foi estimar a eficiência de utilização da energia metabolizável (EM, para ganho de peso, e as exigências de energia metabolizável e nutrientes digestíveis totais de bovinos F1 Simental x Nelore, não-castrados, alimentados com rações contendo diferentes níveis de concentrado. Foram utilizados 29 animais com, em média, idade de 17 meses e peso vivo inicial de 354 kg. Cinco animais foram abatidos ao início do experimento, como referência, e o restante foi alimentado à vontade e distribuído nos tratamentos, de forma inteiramente casualizada, de acordo com o nível de concentrado na ração: 25; 37,5; 50; 62,5; e 75%. Os animais foram abatidos quando atingiram o peso de 500 kg. As concentrações de energia líquida das rações foram calculadas e as eficiências de utilização da energia metabolizável para ganho de peso foram estimadas, por análise de regressão, entre as energias líquidas para ganho, em relação à energia metabolizável (EM das rações. As exigências de EM para ganho de um quilograma de peso de corpo vazio aumentaram, à medida que se elevou o peso corporal dos animais e diminuíram, para mesmo peso vivo, à medida que se elevaram os níveis de concentrado nas rações. Estimaram-se as eficiências de utilização da energia metabolizável para ganho de peso em: 0,27; 0,26; 0,36; 0,39; e 0,42. O nível de concentrado melhorou a eficiência de utilização da EM para ganho de peso.The objective of this work was to estimate the efficiency of metabolizable energy utilization (ME for weight gain, and the requirements of metabolizable energy and total digestible nutrients in F1 Simental x Nellore bulls fed diets containing different concentrate levels. Twenty-nine animals averaging 17 of age and initial live weight of 354 kg were used. Five animals were slaughtered in the beginning of the experiment, as a reference, and the remainders were full fed and allotted to a completely randomized

  18. Gentilly 2 maintenance in a total quality environment

    Energy Technology Data Exchange (ETDEWEB)

    Ross, M H; Marois, H [Hydro-Quebec, Gentilly (Canada). Gentilly Generating Station

    1993-12-31

    Comprehensive preventive maintenance programs at Gentilly-2 Nuclear Generating Station are based on a policy that seeks to balance requirements against resources. A commitment to total quality aims at performance improvement and total customer satisfaction. To improve overall performance to an annual availability factor of 90%, planned outages must be limited to 21 days per year, and the preventive maintenance program must be upgraded. A quality improvement team is involved in supporting this initiative. This team will seek to bring a new balance to the program, and eventually optimize it, using reliability-centred maintenance techniques. 24 figs.

  19. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  20. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  1. Predicting maintenance of attendance at walking groups: testing constructs from three leading maintenance theories.

    Science.gov (United States)

    Kassavou, Aikaterini; Turner, Andrew; Hamborg, Thomas; French, David P

    2014-07-01

    Little is known about the processes and factors that account for maintenance, with several theories existing that have not been subject to many empirical tests. The aim of this study was to test how well theoretical constructs derived from the Health Action Process Approach, Rothman's theory of maintenance, and Verplanken's approach to habitual behavior predicted maintenance of attendance at walking groups. 114 participants, who had already attended walking groups in the community for at least 3 months, completed a questionnaire assessing theoretical constructs regarding maintenance. An objective assessment of attendance over the subsequent 3 months was gained. Multilevel modeling was used to predict maintenance, controlling for clustering within walking groups. Recovery self-efficacy predicted maintenance, even after accounting for clustering. Satisfaction with social outcomes, satisfaction with health outcomes, and overall satisfaction predicted maintenance, but only satisfaction with health outcomes significantly predicted maintenance after accounting for clustering. Self-reported habitual behavior did not predict maintenance despite mean previous attendance being 20.7 months. Recovery self-efficacy, and satisfaction with health outcomes of walking group attendance appeared to be important for objectively measured maintenance, whereas self-reported habit appeared not to be important for maintenance at walking groups. The findings suggest that there is a need for intervention studies to boost recovery self-efficacy and satisfaction with outcomes of walking group attendance, to assess impact on maintenance.

  2. Optimizing Maintenance Planning in the Production Industry Using the Markovian Approach

    Directory of Open Access Journals (Sweden)

    B Kareem

    2012-12-01

    Full Text Available Maintenance is an essential activity in every manufacturing establishment, as manufacturing effectiveness counts on the functionality of production equipment and machinery in terms of their productivity and operational life. Maintenance cost minimization can be achieved by adopting an appropriate maintenance planning policy. This paper applies the Markovian approach to maintenance planning decision, thereby generating optimal maintenance policy from the identified alternatives over a specified period of time. Markov chains, transition matrices, decision processes, and dynamic programming models were formulated for the decision problem related to maintenance operations of a cable production company. Preventive and corrective maintenance data based on workloads and costs, were collected from the company and utilized in this study. The result showed variability in the choice of optimal maintenance policy that was adopted in the case study. Post optimality analysis of the process buttressed the claim. The proposed approach is promising for solving the maintenance scheduling decision problems of the company.

  3. Intelligent Operation and Maintenance of Micro-grid Technology and System Development

    Science.gov (United States)

    Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian

    2018-01-01

    In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.

  4. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  5. EPR design for maintenance

    International Nuclear Information System (INIS)

    Krugmann, U.

    1998-01-01

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  6. A human factors approach to effective maintenance

    International Nuclear Information System (INIS)

    Penington, J.; Shakeri, S.

    2006-01-01

    Traditionally in the field of Human Factors within the nuclear industry, the focus has been to identify the potential for human errors in operating tasks, and develop strategies to prevent their occurrence, provide recovery mechanisms, and mitigate the consequences of error as appropriate. Past experience has demonstrated however a significant number of human errors within the nuclear industry occur during maintenance tasks. It is for this reason, and the fact that our nuclear power plants are ageing and increasingly in need of maintenance, that the industry must pay more attention to maintenance tasks. The purpose of this paper is to present a framework for effective maintenance programs, and based upon this framework discuss an approach (an audit tool) that can be used to both design such a program, and to assess existing programs. In addition, this tool can form the basis of cost benefit decisions relating to priorities for improvements to existing programs. (author)

  7. Energeia of maintenance. Knowledge resource maintenance and creation of new value

    International Nuclear Information System (INIS)

    Iwata, Shuichi

    2011-01-01

    After the Fukushima accident occurred in March 2011, the intellectual energeia of maintenology (motive force of implementation) - 'arrow of information' - could be obtained by trying to establish academic agenda from uniting 'arrow of time' and 'arrow of entropy' based on historical review and then dividing characteristics of maintenance objects needed from society in the future, into content, context and measures in order to overcome this chaos. Looking at contaminated area map around Chernobyl and comparing state of Ukraine elapsed 25 years after Chernobyl accident with that of Fukushima in great social anxiety at present, various 'arrow of information' could be enumerated such as (1) openness of content of accident information and evaluation of context, (2) safety and stability of social society, (3) perfect individual's care and human right for knowing risk, (4) data literacy, (5) various risks, (6) data dissemination and (7) utilization of outsider's view. Knowledge maintenology should be expanded in the area such as (1) preservation of global environment and maintenology, (2) problem of contaminated area with radioactive materials: data science and maintenology, (3) maintenance of large artificial product: experimental science, theoretical science, computational science and maintenology, (4) maintenance of knowledge related with events having complicated causality: design science responding to various risks. As for utilization of nuclear energy, maintenance technology, which shall balance its benefit and risk of society and establish science needed for security of all human being -a raison d'etre and energeia of maintenology-, should be considered for upper structure about global energy, environment, economics and politics (including military affairs) and human society, not for respective energy system in specific country or organization. Fundamentals of energeia of maintenology shall be implemented in the same spirit of 'Yui', small mutual aid organization

  8. Road maintenance optimization through a discrete-time semi-Markov decision process

    International Nuclear Information System (INIS)

    Zhang Xueqing; Gao Hui

    2012-01-01

    Optimization models are necessary for efficient and cost-effective maintenance of a road network. In this regard, road deterioration is commonly modeled as a discrete-time Markov process such that an optimal maintenance policy can be obtained based on the Markov decision process, or as a renewal process such that an optimal maintenance policy can be obtained based on the renewal theory. However, the discrete-time Markov process cannot capture the real time at which the state transits while the renewal process considers only one state and one maintenance action. In this paper, road deterioration is modeled as a semi-Markov process in which the state transition has the Markov property and the holding time in each state is assumed to follow a discrete Weibull distribution. Based on this semi-Markov process, linear programming models are formulated for both infinite and finite planning horizons in order to derive optimal maintenance policies to minimize the life-cycle cost of a road network. A hypothetical road network is used to illustrate the application of the proposed optimization models. The results indicate that these linear programming models are practical for the maintenance of a road network having a large number of road segments and that they are convenient to incorporate various constraints on the decision process, for example, performance requirements and available budgets. Although the optimal maintenance policies obtained for the road network are randomized stationary policies, the extent of this randomness in decision making is limited. The maintenance actions are deterministic for most states and the randomness in selecting actions occurs only for a few states.

  9. Optimal condition-based maintenance decisions for systems with dependent stochastic degradation of components

    International Nuclear Information System (INIS)

    Hong, H.P.; Zhou, W.; Zhang, S.; Ye, W.

    2014-01-01

    Components in engineered systems are subjected to stochastic deterioration due to the operating environmental conditions, and the uncertainty in material properties. The components need to be inspected and possibly replaced based on preventive or failure replacement criteria to provide the intended and safe operation of the system. In the present study, we investigate the influence of dependent stochastic degradation of multiple components on the optimal maintenance decisions. We use copula to model the dependent stochastic degradation of components, and formulate the optimal decision problem based on the minimum expected cost rule and the stochastic dominance rules. The latter is used to cope with decision maker's risk attitude. We illustrate the developed probabilistic analysis approach and the influence of the dependency of the stochastic degradation on the preferred decisions through numerical examples

  10. Gym-based exercise and home-based exercise with telephone support have similar outcomes when used as maintenance programs in adults with chronic health conditions: a randomised trial

    Directory of Open Access Journals (Sweden)

    Paul Jansons

    2017-07-01

    Trial registration: ACTRN12610001035011. [Jansons P, Robins L, O’Brien L, Haines T (2017 Gym-based exercise and home-based exercise with telephone support have similar outcomes when used as maintenance programs in adults with chronic health conditions: a randomised trial. Journal of Physiotherapy 63: 154–160

  11. The state-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-01-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system

  12. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  13. Study on risk-based operation and maintenance using the living PSA system

    International Nuclear Information System (INIS)

    Kurisaka, K.

    2000-01-01

    The objective of this study is to contribute to an improvement of fast reactor plant operation and maintenance from the standpoint of risk assessment. An effort was made to analyze a relationship between the valve failure probability and the standby time based on the component reliability database and statistical analysis system (CORDS). According to the analysis result, the following issues were examined: the surveillance test interval (STI), timing and the allowable outage time (AOT) of redundant valve system in a fast reactor model plant. An examination was performed based on the failure probability non-linearly dependent on the standby time using the risk importance measures and technique to optimize the AOT which are incorporated in the living PSA system (LIPSAS). The case study showed that consideration of non-linear time trend of the failure probability made the recommended STI and AOT longer under the same risk limitation. It is recommended to apply the nonlinear expression of demand failure probability in estimating the STI and AOT based on the risk measures. (author)

  14. Feasibility study of component risk ranking for plant maintenance

    International Nuclear Information System (INIS)

    Ushijima, Koji; Yonebayashi, Kenji; Narumiya, Yoshiyuki; Sakata, Kaoru; Kumano, Tetsuji

    1999-01-01

    Nuclear power is the base load electricity source in Japan, and reduction of operation and maintenance cost maintaining or improving plant safety is one of the major issues. Recently, Risk Informed Management (RIM) is focused as a solution. In this paper, the outline regarding feasibility study of component risk ranking for plant maintenance for a typical Japanese PWR plant is described. A feasibility study of component risk raking for plant maintenance optimization is performed on check valves and motor-operated valves. Risk ranking is performed in two steps using probabilistic analysis (quantitative method) for risk ranking of components, and deterministic examination (qualitative method) for component review. In this study, plant components are ranked from the viewpoint of plant safety / reliability, and the applicability for maintenance is assessed. As a result, distribution of maintenance resources using risk ranking is considered effective. (author)

  15. Study on Maintenance Practices for School Buildings in Terengganu and Kedah, Malaysia

    Directory of Open Access Journals (Sweden)

    Mohammad Ropi R.

    2014-03-01

    Full Text Available Malaysia initiated talks on building maintenance in 1971 during the Second Malaysia Plan of 1971-1975. Later, the government introduced the Building and Common Property (Maintenance and Management Act, 2007 to provide proper maintenance and management of buildings. School buildings are one of the important facilities for basic knowledge in everyday life. Accordingly, the maintenance of school buildings, which serve staff and students, needs considerable attention as effective maintenance protects capital investment, ensures the health and safety of the children, and supports educational performance. Based on a combination of literature survey and questionnaire appraisal, this study evaluates the maintenance practices in designated schools in Malaysia. Overall, the study showed that most of the school buildings do not possess their own maintenance management practices. Moreover, no preventive or planned maintenance was observed, and only emergency maintenance was applied when necessary. The study recommends the implementation of planned maintenance practices, which will be more effective than unplanned maintenance, mostly because of the reduction in repair costs.

  16. Use of probabilistic risk assessment in maintenance activities at Palo Verde

    International Nuclear Information System (INIS)

    Lindquist, R.C.; Pobst, D.S.

    1993-01-01

    Probabilistic risk assessment (PRA) is an important tool in addressing various maintenance activities. At the Palo Verde nuclear generating station (PVNGS), the PRA has been used in a variety of ways to support a wide and diverse selection of maintenance-related activities. For on-line or at-power maintenance, the PRA was used to evaluate combinations of maintenance activities possible with the 12-week or floating maintenance schedule. The maintenance schedule was evaluated to identify any higher risk, undesirable combinations of equipment outages, such as the sole steam-driven auxiliary feedwater pump and the same train emergency diesel generator. Table I is a sampling of the results from the maintenance schedule evaluation in terms of increase in conditional core damage frequency (CDF) above the base- line value due to maintenance on some important key safety systems and combinations thereof. The baseline CDF is 7.4 x 10 -7 per 72 h

  17. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  18. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  19. Genetic gain prediction on UNB-2U popcorn population under recurrent selection by using different selection indexes / Predição de ganhos genéticos na população de milho pipoca UNB-2U sob seleção recorrente utilizando-se diferentes índices de seleção

    Directory of Open Access Journals (Sweden)

    Alexandre Pio Viana

    2009-12-01

    Full Text Available Aiming to estimate the gain prediction by using selection indexes on cycle C4 of UNB-2U, two hundred progenies of full-sib families were obtained on the third cycle under recurrent selection. The progenies were evaluated in a randomized complete block design with two replications within sets, in two distinct environments: Colégio Estadual Agrícola Antônio Sarlo, located in Campos dos Goytacazes, and Experimental Station of PESAGRO-Rio, located in Itaocara, Rio de Janeiro State. The utilized selection indexes were the Smith (1936 and Hazel (1943, Pesek and Baker (1969, Williams (1962, and Mulamba and Mock (1978. The selection index of Mulamba and Mock (1978 allowed the prediction of negative gains for number of disease ears, number of ears attacked by insects, number of broken plants, poorly hulled ears; and it provided superior gains for popcorn expansion and grain yield, with values of 10.55% and 8.50%, respectively, in the use of arbitrary weights attributed by tentative.Com o intento de estimar a predição de ganhos por índices de seleção no ciclo C4 de UNB-2U, duzentas famílias de irmãos-completos foram obtidas a partir da população de terceiro ciclo de seleção recorrente. As progênies foram avaliadas no delineamento de blocos casualizados com duas repetições dentro de ‘‘sets’’ em dois ambientes distintos: Colégio Estadual Agrícola Antônio Sarlo, em Campos dos Goytacazes, e Estação Experimental da PESAGRO-RIO, em Itaocara, Rio de Janeiro. Os índices de seleção empregados para predizer os ganhos foram os de Mulamba e Mock (1978, Pesek e Baker (1969, Smith (1936 e Hazel (1943 e Williams (1962. O índice de seleção Mulamba e Mock (1978 além de permitir a predição de ganhos negativos para número de espigas doentes e atacadas por pragas, número de plantas quebradas e acamadas, e espigas mal empalhadas; para capacidade de expansão e rendimento dos grãos, proporcionou ganhos superiores aos demais

  20. A methodology based in particle swarm optimization algorithm for preventive maintenance focused in reliability and cost

    International Nuclear Information System (INIS)

    Luz, Andre Ferreira da

    2009-01-01

    In this work, a Particle Swarm Optimization Algorithm (PSO) is developed for preventive maintenance optimization. The proposed methodology, which allows the use flexible intervals between maintenance interventions, instead of considering fixed periods (as usual), allows a better adaptation of scheduling in order to deal with the failure rates of components under aging. Moreover, because of this flexibility, the planning of preventive maintenance becomes a difficult task. Motivated by the fact that the PSO has proved to be very competitive compared to other optimization tools, this work investigates the use of PSO as an alternative tool of optimization. Considering that PSO works in a real and continuous space, it is a challenge to use it for discrete optimization, in which scheduling may comprise variable number of maintenance interventions. The PSO model developed in this work overcome such difficulty. The proposed PSO searches for the best policy for maintaining and considers several aspects, such as: probability of needing repair (corrective maintenance), the cost of such repairs, typical outage times, costs of preventive maintenance, the impact of maintaining the reliability of systems as a whole, and the probability of imperfect maintenance. To evaluate the proposed methodology, we investigate an electro-mechanical system consisting of three pumps and four valves, High Pressure Injection System (HPIS) of a PWR. Results show that PSO is quite efficient in finding the optimum preventive maintenance policies for the HPIS. (author)