WorldWideScience

Sample records for assessment program deliverables

  1. Medical University of South Carolina Environmental Hazards Assessment Program. Volume 5: Annual report, July 1, 1993--June 30, 1994 deliverables

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Medical University of South Carolina`s vision is to become the premier national resource for medical information and for environmental/health risk assessment. A key component to the success of the many missions of the Environmental Hazards Assessment Program (EHAP) is timely access to large volumes of data. This study documents the results of the needs assessment effort conducted to determine the information access and processing requirement of EHAP. The following topics are addressed in this report: environmental medicine and risk communication: curriculum and a professional support network-Department of Family Medicine; environmental hazards assessment and education program in pharmacy graduate education in risk assessment; and graduate education risk assessment.

  2. Medical University of South Carolina Environmental Hazards Assessment Program. Volume 6: Annual report, July 1, 1993--June 30, 1994 deliverables

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Medical University of South Carolina`s vision is to become the premier national resource for medical information and for environmental/health risk assessment. A key component to the success of the many missions of the Environmental Hazards Assessment Program (EHAP) is timely access to large volumes of data. This study documents the results of the needs assessment effort conducted to determine the information access and processing requirements of EHAP. This report addresses the Department of Environmental Health Science, education and training initiative.

  3. Medical University of South Carolina Environmental Hazards Assessment Program. Deliverables: Volume 3, Annual report, July 1, 1993--June 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This reference is concerned with the Crossroads of Humanity workshop which is part of the Environmental Hazards Assessment Program at the Medical University of South Carolina. This workshop was held during the month of June and July 1994. Topics discussed include: Perceived Risk Advisory Committee Meeting, surveys of public opinion about hazardous and radioactive materials, genetics,antibodies, and regulatory agencies.

  4. Medical University of South Carolina Environmental Hazards Assessment Program. Deliverables: Volume 2, Annual report, July 1, 1993--June 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This reference is concerned with the Crossroads of Humanity workshop which is part of the Environmental Hazards Assessment Program at the Medical University of South Carolina. This workshop was held during the months of June and July 1994. Topics discussed include: Radioactive contamination, aging, medical ethics, and environmental risk analysis.

  5. FY2004 Progress Summary and FY2005 Program Plan Statement of Work and Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Meier, W; Bibeau, C

    2006-01-23

    FY2004 progress summary and FY2005 program plan statement of work and deliverables for development of high average power diode-pumped solid state lasers, and complementary technologies for applications in energy and defense.

  6. Deliverable 4.3 Decision support guideline based on LCA and cost/efficiency assessment

    OpenAIRE

    Larsen, Henrik Fred; Hansen, Peter Augusto; Boyer-Souchet, Florence

    2010-01-01

    The environmental sustainability assessments described in this report is based on life cycle assessments (LCA) of selected waste water treatment technology (WWTT) cases included in NEPTUNE. The basic approach in these assessments (avoided against induced impacts) is described in Deliverable 4.1 (Larsen et al. 2007) and other methodological issues (e.g. normalization and weighting) in Deliverable 4.2 (Larsen et al. 2009). The basic approach is illustrated in a simplified way for the case ozona...

  7. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Appel, Gordon John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-05-01

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  8. Evolution and development of a deliverability improvement program for gas storage

    International Nuclear Information System (INIS)

    With the implementation in November 1993 of FERC Order 636, the responsibilities and contractual obligations for a Gas Transmission Company operating Gas Storage have changed. Among these responsibilities is the ability to deliver gas from storage in a timely manner as specified by gas storage contracts. To ensure that their deliverability obligations are met, a program has been implemented to review well performance and to re-work wells where deliverability can economically be improved. This program is aimed at maintaining or improving deliverability from wells and monitoring their future performance. Re-working existing wells has proven to be an economically successful method of maintaining deliverability compared to drilling new wells to meet this purpose. Re-working can be broken into two groups of wells: wells that have mechanical problems that need to be corrected or wells that need some type of stimulation treatment. In developing a rework program, several things need to be addressed such as: a candidate recognition program, the design of the work to be performed, execution of that work, and the evaluation of the results obtained along with the economics. The Deliverability Improvement Program is in its third year. It has developed from a small pilot program to a substantial part of normal storage activities. The purpose of this paper is to review the processes used to find candidates to work on and an evaluation of work performed

  9. Deliverable 3.3.1 - Assessment Methodology on ISISEMD platform

    DEFF Research Database (Denmark)

    Peterson, Carrie Beth

    2009-01-01

    The overall goal of the ISISEMD project is to offer innovative ICT services to improve the quality of life of elderly persons with cognitive problems or mild dementia and their informal and formal caregivers who provide every day care for them. This will be done via the ISISEMD platform – a...... platform of intelligent scalable ICT services which will be tested for a period of 12 months under realistic conditions with end-users. In order to analyse the impact and the outcome from introducing these services, after the one year of pilot operation, overall assessment will be carried out by the...

  10. Short-term Canadian natural gas deliverability 2006-2008 : an energy market assessment

    International Nuclear Information System (INIS)

    This report presented an assessment of the expected capability of Canadian gas production through to the year 2008. Strong natural gas prices have led to record drilling levels in Canada's natural gas industry. North American natural gas prices reached a peak near the end of 2005. The rise in prices during 2005 reflected high world crude oil prices, a tight balance between natural gas supply and demand, and disruptions to United States gas supply from 2 hurricanes. In response to rising prices, western Canada drilling activity achieved new highs in early 2006. Higher drilling rates also reflected rising costs for key inputs of steel, fuel, and labour. Gas prices have since softened due to a storage overhang resulting from a mild winter. The combination of rising costs and softening prices has impacted margins for Canadian gas producers. In response, some producers have reduced drilling expansion plans in coalbed methane (CBM) and shallow gas plays in the Western Canadian Sedimentary Basin (WCSB). Increases in deeper gas drilling have been maintained. Total gas drilling for 2006 is expected to rise by 3 per cent compared to 2005. The report projected a small increase in Canada's total annual gas production from 484 million m3/d in 2005 to 491 million m3/d in 2008. Annual average deliverability of conventional gas is expected to decline slightly over the projection period. The decrease is expected to be more than offset by growth in CBM production in western Canada, which is expected to increase from 8 million m3/d in 2005 to 27 million m3/d in 2008. 5 tabs., 5 figs

  11. Overview of resulting tools, guidelines, and instruments. IN-SAFETY Workpackage 3: New models, tools and guidelines for road safety assessment, Deliverable 3.4.

    OpenAIRE

    Dijkstra, A. Bald, S. Benz, T. & Gaitanidou, E. (eds.)

    2009-01-01

    Road safety will most probably be influenced by introducing Advanced Driver Assistance Systems (ADAS) or Intelligent Vehicle Safety Systems (IVSS). The effects of these systems on road safety can be assessed in different ways. This document gives a short overview of methodologies which allow for assessing road safety effects (Chapter 2), This Deliverable gives an overview of the outcome of work package 3 of IN-SAFETY. Two methodologies have basically been applied: • simulation model • risk an...

  12. Deliverable 4.3 Decision support guideline based on LCA and cost/efficiency assessment

    DEFF Research Database (Denmark)

    Larsen, Henrik Fred; Hansen, Peter Augusto; Boyer-Souchet, Florence

    2010-01-01

    four clusters related to the main purpose of the treatment, e.g. nutrient removal or micropollutant removal. All are assessed within the cluster by comparing with the reference or by looking at induced versus avoided environmental impacts potentials originated from the various emissions and flows...... inventory of cluster 1 on micropollutant removal, tracks 22 organic micropollutants (pharmaceuticals) that have been sampled in different WWTTs by NEPTUNE partners. The resulting inventory is then modelled according to the EDIP97 methodology on the GaBi LCA modelling software, i.e. GaBi 4 (PE 2008), with...

  13. Wavetrain 2 : Deliverable 28

    DEFF Research Database (Denmark)

    Chozas, Julia Fernandez

    This deliverable presents a selection of case studies on socio-economic aspects of wave energy, developed by Wavetrain2 partners SPOK and WavEC, that represent key areas of research during the WT2 period. More information and a few other case studies can be also found in the previous deliverables....... Gordon Dalton (HMRC) and Hans C. Sorensen (SPOK). It included 3 main parts: a first introduction to microeconomics at project level, a second practical session on the use of economic model Retscreen and a final session introducing macro and socio-economic aspects....

  14. Wavetrain 2 : Deliverable 29

    DEFF Research Database (Denmark)

    Crom, Izan Le; Pecher, Arthur; Parmeggiani, Stefano; Chozas, Julia Fernandez

    Deliverable 29 describes a newly proposed methodology to evaluate the power performances of wave (and tidal) energy converters. This methodology has been applied within the Wavetrain2 project to evaluate the production of two wave energy conversion plants: the Pico OWC Plant and the Wave Dragon...

  15. Landsat maps (phase V, deliverable 60), ASTER maps (phase V, deliverable 62), ASTER_DEM maps (phase V, deliverable 63), and spectral remote sensing in support of PRISM-II mineral resource assessment project, Islamic Republic of Mauritania (phase V, deliverables 61 and 64): Chapter E in Second projet de renforcement institutionnel du secteur minier de la République Islamique de Mauritanie (PRISM-II)

    Science.gov (United States)

    Rockwell, Barnaby W.; Knepper, Daniel H.; Horton, John D.

    2015-01-01

    Multispectral satellite data acquired by the Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper Plus (ETM+), and Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) sensors were processed and interpreted in support of the PRISM-II project (Second Projet de Renforcement Institutionnel du Secteur Minier de la Republique Islamique de Mauritanie). This report and accompanying maps constitute project deliverables 60–64. All digital data for use in Geographic Information System (GIS) and image processing software will be included in the GIS deliverable 92. Image maps in PDF format of the processed Landsat and ASTER scenes are referenced in the appendixes.

  16. Assessment of BIOrefinery concepts and the implications for agricultural and forestry POLicy : Deliverable 7.6 : BIOPOL Final report

    NARCIS (Netherlands)

    Annevelink, E.; Kamm, B.; Schönicke, P.; Menrad, K.; Kurka, S.; Klein, A.; Rogulska, M.; Karbowski, A.; Peck, P.; McCormick, K.; Lenhart, J.; Capros, P.; Agathokles, D.E.; Reith, J.H.; Mozaffarian, H.; Meesters, K.P.H.; Ree, van R.; Bennett, S.; Bauen, A.W.

    2009-01-01

    BIOPOL is a two-year research project funded by the European Commission since 2007 through the Sixth Framework Programme. The overall goal of BIOPOL is to assess the status (technical, social, environmental, political, and implementation) of innovative BIOrefinery concepts and the implications for a

  17. Assessment of BIOrefinery concepts and the implications for agricultural and forestry POLicy : Deliverable 7.6 : BIOPOL Final report

    OpenAIRE

    Annevelink, E.; Kamm, B.; Schönicke, P.; Menrad, K.; Kurka, S.; Klein, A.; Rogulska, M.; Karbowski, A.; Peck, P.; McCormick, K; Lenhart, J; P. Capros; Agathokles, D.E.; Reith, J.H.; Mozaffarian, H.

    2009-01-01

    BIOPOL is a two-year research project funded by the European Commission since 2007 through the Sixth Framework Programme. The overall goal of BIOPOL is to assess the status (technical, social, environmental, political, and implementation) of innovative BIOrefinery concepts and the implications for agricultural and forestry POLicy. Biorefinery concepts are aimed at relevant market-competitive and environmental-friendly synthesis of bio-products (chemicals and/or materials) together with the pr...

  18. Environmental Hazards Assessment Program. Quarterly report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-04

    The objectives of the EHAP program are to: Develop a holistic, national basis for risk assessment, risk management and risk communication; Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and; Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter of year two (January-March, 1994) of the grant. To better accomplish objectives, grant efforts are organized into three major elements: The Crossroads of Humanity Series; Research, Science and Education Programs; and Program Management. The Crossroads of Humanity Series charted a new course, incorporating lessons learned during previous quarters into a series of programs designed to address environmental issues in a real world setting. Reports are included on the various research programs with milestones and deliverables from the third quarter.

  19. Geography Undergraduate Program Assessment

    Science.gov (United States)

    Estaville, Lawrence E.; Brown, Brock J.; Caldwell, Sally

    2006-01-01

    Assessment of geography undergraduate programs, which incorporate external reviews and concomitant departmental self-studies, attempt to assure pedagogical excellence within uncompromising commitments to successful student learning outcomes, currency of the knowledge and skills imparted, and continuous programmatic improvement. Programmatic…

  20. NRC performance assessment program

    International Nuclear Information System (INIS)

    The U.S. Nuclear Regulatory Commission's (NRC) performance assessment program includes the development of guidance to the U.S. Department of Energy (DOE) on preparation of a license application and on conducting the studies to support a license application. The nature of the licensing requirements of 10 CFR Part 60 create a need for performance assessments by the DOE. The NRC and DOE staffs each have specific roles in assuring the adequacy of those assessments. Performance allocation is an approach for determining what testing and analysis will be needed during site characterization to assure that an adequate data base is available to support the necessary performance assessments. From the standpoint of establishing is implementable methodology, the most challenging performance assessment needed for licensing is the one that will be used to determine compliance with the U.S. Environmental Protection Agency's (EPA) containment requirement

  1. Deliverable 1.2 Road safety management investigation model and questionnaire

    OpenAIRE

    Dupont, Emmanuelle; Martensen, Heike; PAPADIMITRIOU, Eleonora; YANNIS, George; MUHLRAD, Nicole; JAHI, Heikki; VALLET, Gilles; Giustiniani, Gabriele; PERSIA, Luca; BAX, Charlotte; WIJNEN, Wim; MACHATA, Klaus; BUTLER, Ilona; ZYSINSKA, Malgorzata; BARNES, Jo

    2011-01-01

    The aim of the DaCoTA Work Package 1 is to investigate road safety policy-making and management processes in Europe. In the Deliverables released previously, the Work Package 1 assessed the experts' needs in terms of road safety knowledge, data and decision support tools (Deliverable 1.1/4.1), as well as the road safety stakeholders' views (Deliverable 1.3). These two Deliverables contain information on the present and future needs and the actual availability of various types of road safety d...

  2. MRI assessment program

    International Nuclear Information System (INIS)

    The MRI Assessment Program involves installation and operation of five MRI units in Australian public hospitals and the evaluation at each unit of the cost and efficacy of the technology over a period of two years. This first report in a series presents preliminary usage and cost data for the year to 30 June 1987 as well as describing the background and the data set. 6 figs., tabs

  3. MRI assessment program

    International Nuclear Information System (INIS)

    Usage, cost and efficacy data from the MRI Assessment Program to 30 March 1988 is presented, as a continuation of an earlier analysis. Analysis has been performed on data from 8565 examinations relating to 7997 patients at 4 hospitals. MRI was used mainly for examination of the head and spine. Some details of the follow up studies being conducted on selected patients and disease categories are given. A consensus statement is included which summaries the view of the Technical Committee on the potential applications of MRI in Australia. The MRI unit quench incident at Royal Adelaide Hospital is described. Refs., 10 figs., tabs

  4. Assessment Strategies for Pair Programming

    Science.gov (United States)

    Hahn, Jan Hendrik; Mentz, Elsa; Meyer, Lukas

    2009-01-01

    Although pair programming has proved its usefulness in teaching and learning programming skills, it is difficult to assess the individual roles and abilities of students whilst programming in pairs. (Note that within this manuscript, the term assessment refers to evaluating individual student performance.) Assessing only the outcomes of a pair…

  5. Public Risk Assessment Program

    Science.gov (United States)

    Mendeck, Gavin

    2010-01-01

    The Public Entry Risk Assessment (PERA) program addresses risk to the public from shuttle or other spacecraft re-entry trajectories. Managing public risk to acceptable levels is a major component of safe spacecraft operation. PERA is given scenario inputs of vehicle trajectory, probability of failure along that trajectory, the resulting debris characteristics, and field size and distribution, and returns risk metrics that quantify the individual and collective risk posed by that scenario. Due to the large volume of data required to perform such a risk analysis, PERA was designed to streamline the analysis process by using innovative mathematical analysis of the risk assessment equations. Real-time analysis in the event of a shuttle contingency operation, such as damage to the Orbiter, is possible because PERA allows for a change to the probability of failure models, therefore providing a much quicker estimation of public risk. PERA also provides the ability to generate movie files showing how the entry risk changes as the entry develops. PERA was designed to streamline the computation of the enormous amounts of data needed for this type of risk assessment by using an average distribution of debris on the ground, rather than pinpointing the impact point of every piece of debris. This has reduced the amount of computational time significantly without reducing the accuracy of the results. PERA was written in MATLAB; a compiled version can run from a DOS or UNIX prompt.

  6. Industrial Assessment Center Program

    Energy Technology Data Exchange (ETDEWEB)

    Dr. Dereje Agonafer

    2007-11-30

    The work described in this report was performed under the direction of the Industrial Assessment Center (IAC) at University of Texas at Arlington. The IAC at The University of Texas at Arlington is managed by Rutgers University under agreement with the United States Department of Energy Office of Industrial Technology, which financially supports the program. The objective of the IAC is to identify, evaluate, and recommend, through analysis of an industrial plant’s operations, opportunities to conserve energy and prevent pollution, thereby reducing the associated costs. IAC team members visit and survey the plant. Based upon observations made in the plant, preventive/corrective actions are recommended. At all times we try to offer specific and quantitative recommendations of cost savings, energy conservation, and pollution prevention to the plants we serve.

  7. Capacity Development and Strengthening for Energy Policy formulation and implementation of Sustainable Energy Projects in Indonesia CASINDO. Deliverable No. 17. Development of Education Programs at Indonesian Universities

    Energy Technology Data Exchange (ETDEWEB)

    Wijnker, M. [Eindhoven University of Technology TUE, Eindhoven (Netherlands)

    2011-08-15

    The overall objective of the CASINDO programme is to establish a self-sustaining and self-developing structure at both the national and regional level to build and strengthen human capacity to enable the provinces of North Sumatra, Yogyakarta, Central Java, West Nusa Tenggara and Papua to formulate sound policies for renewable energy and energy efficiency and to develop and implement sustainable energy projects. All five Indonesian partner universities managed to develop and implement an education program within the timeline of the CASINDO project. UMY (Muhammadiyah University of Yogyakarta, Indonesia), UNRAM (University of Mataram, Mataram, Indonesia) and UNCEN (Cenderawasih University, Jayapura, Papua, Indonesia) have chosen to develop a certificate program. UNDIP (Diponegoro University in Semarang, Java, Indonesia) and USU (University of Sumatra Utara, Medan, Indonesia) have both developed a master program in sustainable energy. UNDIP has already discussed the proposal of their master program with the Ministry of Education and will have to make some improvements. USU will first start the program as a specialisation within the Mechanical Engineering department and in some time continues to make it an independent master program. At all universities both contact persons and lecturers have put a lot of effort in developing the programs and succeeded. Additionally, through CASINDO a network of lecturers between the universities has developed, which will ease future cooperation, after the CASINDO project will have finished.

  8. Defense Programs Transportation Risk Assessment

    International Nuclear Information System (INIS)

    This paper provides an overview of the methodology used in a probabilistic transportation risk assessment conducted to assess the probabilities and consequences of inadvertent dispersal of radioactive materials arising from severe transportation accidents. The model was developed for the Defense Program Transportation Risk Assessment (DPTRA) study. The analysis incorporates several enhancements relative to previous risk assessments of hazardous materials transportation including newly-developed statistics on the frequencies and severities of tractor semitrailer accidents and detailed route characterization using the 1990 Census data

  9. Financial Sector Assessment Program

    OpenAIRE

    World Bank; International Monetary Fund

    2016-01-01

    This technical note reviews with the status access to finance for enterprises in Montenegro, identifies key bottlenecks, and provides recommendations on how to address main challenges. In particular, the note focuses on SME finance by assessing (i) bank SME lending, and (ii) current constraints facing further development and deepening of the non-bank credit sector. The note develops key fi...

  10. Forest Technology Program Outcome Assessment

    OpenAIRE

    Bartholomay, G. Andrew

    2010-01-01

    Course grades are the norm for reporting a student’s overall proficiency. However, the one dimensional nature of grades implies that all individual course components have been equally mastered. The Pennsylvania College of Technology employs an institution wide program of Quality Through Assessment to aid in evaluating the institutional mission to, “provide students with quality academic programs that respond to economic and employment realities” (www.pct.edu/assessment/). The initiative emplo...

  11. Program definition and assessment overview

    Science.gov (United States)

    Gordon, L. H.

    1980-03-01

    The implementation of a program level assessment of thermal energy storage technology thrusts for the near and far term to assure overall coherent energy storage program is considered. The identification and definition of potential thermal energy storage applications, definition of technology requirements, and appropriate market sectors are discussed along with the necessary coordination, planning, and preparation associated with program reviews, workshops, multi-year plans and annual operating plans for the major laboratory tasks.

  12. Environmental assessment of untreated manure use, manure digestion and codigestion with silage maize : Deliverable for the 'EU-AGRO-BIOGAS' project

    NARCIS (Netherlands)

    Vries, de J.W.; Corre, W.J.; Dooren, van H.J.C.

    2010-01-01

    This report describes the environmental impact of untreated manure use, manure digestion, and co-digestion with silage maize for energy production. The life cycle assessment methodology was used. Environmental indicators included were, global warming potential, energy use, eutrophication, acidificat

  13. Risk-Assessment Computer Program

    Science.gov (United States)

    Dias, William C.; Mittman, David S.

    1993-01-01

    RISK D/C is prototype computer program assisting in attempts to do program risk modeling for Space Exploration Initiative (SEI) architectures proposed in Synthesis Group Report. Risk assessment performed with respect to risk events, probabilities, and severities of potential results. Enables ranking, with respect to effectiveness, of risk-mitigation strategies proposed for exploration program architecture. Allows for fact that risk assessment in early phases of planning subjective. Although specific to SEI in present form, also used as software framework for development of risk-assessment programs for other specific uses. Developed for Macintosh(TM) series computer. Requires HyperCard(TM) 2.0 or later, as well as 2 Mb of random-access memory and System 6.0.8 or later.

  14. Overview of resulting tools, guidelines, and instruments. IN-SAFETY Workpackage 3: New models, tools and guidelines for road safety assessment, Deliverable 3.4.

    NARCIS (Netherlands)

    Dijkstra, A. Bald, S. Benz, T. & Gaitanidou, E. (eds.)

    2009-01-01

    Road safety will most probably be influenced by introducing Advanced Driver Assistance Systems (ADAS) or Intelligent Vehicle Safety Systems (IVSS). The effects of these systems on road safety can be assessed in different ways. This document gives a short overview of methodologies which allow for ass

  15. Record of principal work activities/deliverables

    International Nuclear Information System (INIS)

    Over the five year period of performance, thirteen task assignments were issued by the DOE to ARINC Research. During the two year base period seven tasks were assigned. Two task assignments were issued for each of the three consecutive one year option periods. Associated with all task assignments were multiple subtasks, some of which required significant effort. These subtasks are appropriately cited in this report under their respective task assignments as principal work activities or deliverables. The technical and management support provided to the DOE under this contract focused on two general areas: (1) appraisal activities and (2) non-appraisal activities. Support to appraisals included planning, document review, developing lines-of-inquiry, interviewing, data collection, report writing, and follow-up. Such work was executed both on-site at the DOE facility under review and off-site. Non-appraisal support was varied and included such areas as document review, data base development, technical assessments. statistical analysis, policy analysis, reliability engineering, and workshop and conference planning and execution

  16. Environmental assessment of untreated manure use, manure digestion and codigestion with silage maize : Deliverable for the 'EU-AGRO-BIOGAS' project

    OpenAIRE

    Vries, de, N.; Corre, W.J.; Dooren, van, H.J.C.

    2010-01-01

    This report describes the environmental impact of untreated manure use, manure digestion, and co-digestion with silage maize for energy production. The life cycle assessment methodology was used. Environmental indicators included were, global warming potential, energy use, eutrophication, acidification and land use expressed per ton applied product. Digestion of manure and codigestion with silage maize resulted in an improved energy and greenhouse gas balance. However, compared to the use of ...

  17. Busted Butte Unsaturated Zone Transport Test: Fiscal Year 1998 Status Report Yucca Mountain Site Characterization Program Deliverable SPU85M4

    Energy Technology Data Exchange (ETDEWEB)

    Bussod, G.Y.; Turin, H.J.; Lowry, W.E.

    1999-11-01

    This report describes the status of the Busted Butte Unsaturated Zone Transport Test (UZTT) and documents the progress of construction activities and site and laboratory characterization activities undertaken in fiscal year 1998. Also presented are predictive flow-and-transport simulations for Test Phases 1 and 2 of testing and the preliminary results and status of these test phases. Future anticipated results obtained from unsaturated-zone (UZ) transport testing in the Calico Hills Formation at Busted Butte are also discussed in view of their importance to performance assessment (PA) needs to build confidence in and reduce the uncertainty of site-scale flow-and-transport models and their abstractions for performance for license application. The principal objectives of the test are to address uncertainties associated with flow and transport in the UZ site-process models for Yucca Mountain, as identified by the PA working group in February 1997. These include but are not restricted to: (1) The effect of heterogeneities on flow and transport in unsaturated and partially saturated conditions in the Calico Hills Formation. In particular, the test aims to address issues relevant to fracture-matrix interactions and permeability contrast boundaries; (2) The migration behavior of colloids in fractured and unfractured Calico Hills rocks; (3) The validation through field testing of laboratory sorption experiments in unsaturated Calico Hills rocks; (4) The evaluation of the 3-D site-scale flow-and-transport process model (i.e., equivalent-continuum/dual-permeability/discrete-fracture-fault representations of flow and transport) used in the PA abstractions for license application; and (5) The effect of scaling from lab scale to field scale and site scale.

  18. Bioclim Deliverable D10 - 12: development and application of a methodology for taking climate-driven environmental change into account in performance assessments

    International Nuclear Information System (INIS)

    The BIOCLIM project on modelling sequential Biosphere systems under Climate change for radioactive waste disposal is part of the EURATOM fifth European framework programme. The project was launched in October 2000 for a three-year period. The project aims at providing a scientific basis and practical methodology for assessing the possible long term impacts on the safety of radioactive waste repositories in deep formations due to climate and environmental change. Five work packages have been identified to fulfill the project objectives: - Work package 1 will consolidate the needs of the European agencies of the consortium and summarize how environmental change has been treated to date in performance assessments. - Work packages 2 and 3 will develop two innovative and complementary strategies for representing time series of long term climate change using different methods to analyse extreme climate conditions (the hierarchical strategy) and a continuous climate simulation over more than the next glacial-interglacial cycle (the integrated strategy). - Work package 4 will explore and evaluate the potential effects of climate change on the nature of the biosphere systems. - Work package 5 will disseminate information on the results obtained from the three year project among the international community for further use. The output from the climate models developed and applied in WP2 and WP3 has been interpreted in WP4 ('Biosphere system description') in terms of model requirements for the post-closure radiological performance assessment of deep geological repositories for radioactive wastes, in order to develop a methodology to demonstrate how biosphere systems can be represented in the long-term. The work undertaken in WP4 is described in this report. This report describes the methodology used for identification and characterisation of specific climate states and transitions between those climate states. It also covers the application of those methods in the context of

  19. Pacific Northwest regional assessment program

    International Nuclear Information System (INIS)

    The Pacific Northwest (comprised of the states of Alaska, Idaho, Montana, Oregon, Washington and Wyoming) can by several measures be regarded as a national warehouse of fossil energy resources. This condition coupled with an evolving national policy stressing utilization of fossil fuels in the near term prior to development of more advanced technologies for energy supply, could result in the imposition of major changes in the region's environmental, socioeconomic and possibly health status. The objective of the Pacific Northwest Regional Assessment Program is to establish and exercise an integrated analytical assessment program for evaluation of these potential changes that may result from various energy development or conservation scenarios. After consideration of a variety of approaches to integrated assessment at a regional level, Pacific Northwest Laboratories (PNL) has concluded that dynamic simulation techniques provide the best available approach to evaluating the issues pertinent to the Northwest. As a result, the PNW Regional Assessment Program has been structured in a framework involving ten sectors. Each of these sectors involve their own submodels that receive information either from outside the model as exogenous inputs or from other sector submodels

  20. Assessing Participatory and Dialogue Approaches. Deliverable 15

    International Nuclear Information System (INIS)

    This report presents the results of work carried out ARGONA project. The main objective has been to gain some appreciation of the success, or otherwise, of several public involvement approaches associated with radioactive waste disposal facility siting in general and of various involvement activities and techniques in particular, especially any that appear to be novel in their content and/or application. The main focus of the analysis has been to examine three case studies. Firstly the use of stakeholder panels as part of the consultation about the BPEO (Best Practicable Environmental Option) study for low-level radioactive waste (LLW) management at Britain's former centre for fast reactor research and development at Dounreay in northern Scotland; secondly, the series of subsequent 'drop-in' meetings held to communicate information about the development of the agreed solution for these wastes (namely a near-surface disposal facility); thirdly, work carried out by the Nuclear Research Institute at Rez (NRI) in the Czech Republic, as part of ARGONA WP5.1, involving a series of stakeholder meetings to examine radioactive waste management in the context of plans for the management of spent fuel. In order to evaluate the success or usefulness of the approaches, techniques and meetings involved, we have developed a participation process 'Evaluation Matrix'. This has involved the use of criteria against which particular approaches and activities may be judged. In order to develop these we have adapted criteria developed as part of the RISCOM II project and developed a parallel set of descriptions to enable us to examine each activity through the 'lens' of an appropriate Evaluation Matrix. We have then conducted an evaluation using these 'ARGONA criteria' for the three separate case studies. It is recognised that the literature currently fails to offer a methodology for comparing approaches and allowing selection of appropriate techniques for use in particular circumstances. The methodology adopted here has shown that it is however possible to map approaches and techniques against RISCOM-type criteria using a range of information, including feedback forms, questionnaires and interviews. This can inform about how particular approaches are perceived by both sides and assist in development of more suitable methods for the future. Evaluation of the different activities and techniques employed in the three case studies has allowed insight into several common factors, such as timing, purpose of the involvement, scale of the involvement, and development of suitable discussion arenas. We consider that this work makes a contribution to responding to the absence of a comparison methodology by proposing the development of a 'knowledge base' as a basis for reporting participation studies in a manner that would facilitate comparisons and selection of methods appropriate to particular issues. We consider that the resulting knowledge base should be developed in the form of a library of relevant approaches (techniques, meeting types etc) that can be 'indexed' in terms of what the desired end result might be (a requirement for advice; development of societal consensus; provision of clarity regarding a contentious issue etc) and cross referenced as to their suitability at different stages of an involvement process. The intention would then be that a 'customer' agency could consult the knowledge base and identify possible approaches and techniques that would be suitable for use (and adaptation) in the particular situation and at the relevant process stage in question. The approach could be developed more widely to include a large number of processes and a large number of 'requirement criteria' as components in the knowledge base. It should be emphasised, however, that such an approach should be used for communication about what it means to use certain processes, and not as a calculation tool to decide on which method to use in a simple objective manner

  1. Improving the driving practices of pizza deliverers: Response generalization and moderating effects of driving history

    OpenAIRE

    Ludwig, Timothy D.; Geller, E. Scott

    1991-01-01

    A practical intervention program, targeting the safety belt use of pizza deliverers at two stores, increased significantly the use of both safety belts (143% above baseline) and turn signals (25% above baseline). Control subjects (i.e., pizza deliverers at a third no-intervention store and patrons driving to the pizza stores) showed no changes in belt or turn signal use over the course of 7-month study. The intervention program was staggered across two pizza stores and consisted of a group me...

  2. Environmental monitoring and assessment program: 1991 project descriptors. Summary report

    Energy Technology Data Exchange (ETDEWEB)

    Kellar, P.; Suk, P.; Beach, A.

    1991-04-01

    The Environmental Monitoring and Assessment Program (EMAP) is a joint effort of the Office of Modeling, Monitoring Systems, and Quality Assurance and the Office of Environmental Processes and Effects Research, within the Office of Research and Development. The document has been prepared to provide information on the projects within EMAP completed in Fiscal Year 1990 and funded for Fiscal Year 1991. The document is organized into five major sections: the Introduction and Overview and four sections that contain individual Project Descriptors for the four major elements of EMAP. Sections 2, 3, 4, and 5 contain individual Project Descriptors for Resource Monitoring, Coordination Activities, Integration Activities, and Developmental Research, respectively. Additionally, each Project Descriptor is coded (to assist in budget and deliverables tracking) and indexed for easy reference. The categories used to generate the three indices at the back of the document are (1) Regions and States - EPA Regions and states in which field projects or principal research activities are or will be conducted; (2) Project Officers - responsible for managing the project, providing technical direction and guidance, and ensuring coordination among related projects; and (3) Principal Investigators - responsible for ensuring the objectives are met and the work plan is executed. The Principal Investigators Index is further broken down into four categories.

  3. The afterlife of 'living deliverables': angels or zombies?

    OpenAIRE

    Wild, Fridolin; Ullmann, Thomas

    2010-01-01

    Within the STELLAR project, we provide the possibility to use living documents for the collaborative writing work on deliverables. Compared to 'normal' deliverables, 'living' deliverables come into existence much earlier than their delivery deadline and are expected to 'live on' after their official delivery to the European Commission. They are expected to foster collaboration. Within this contribution we investigate, how these deliverables have been used over the first 16 months of the proje...

  4. Road Safety Data, Collection, Transfer and Analysis DaCoTa. Deliverable 1.2: Road safety management investigation model and questionnaire.

    OpenAIRE

    Dupont, H. Martensen, H. Papadimitriou, E. Yannis, G. Muhlrad, N. Jähi, H. Vallet, G. Giustiniani, G. Tripodi, A. Usami, D. Bax, C. Wijnen, W. Schöne, M.-L. Machata, K. Buttler, I. Zysinska, M. Talbot, R. Gitelman, V. & Hakkert, S. & Muhlrad, N. & Dupont, E. (Eds.)

    2012-01-01

    The aim of the DaCoTA Work Package 1 is to investigate road safety policy-making and management processes in Europe. In the Deliverables released previously, the Work Package 1 assessed the experts’ needs in terms of road safety knowledge, data and decision support tools (Deliverable 1.1/4.1), as well as the road safety stakeholders’ views (Deliverable 1.3). These two Deliverables contain information on the present and future needs and the actual availability of various types of road safety d...

  5. CONVENTIONAL COMBUSTION ENVIRONMENTAL ASSESSMENT PROGRAM, EXECUTIVE BRIEFING

    Science.gov (United States)

    The brochure gives an executive briefing of EPA's Conventional Combustion Environmental Assessment (CCEA) Program. The CCEA Program was established recently to coordinate and integrate EPA's research and development efforts for assessing the environmental effects of pollutants fr...

  6. Assessment of government tribology programs

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, M.B.; Levinson, T.M.

    1985-09-01

    An assessment has been made to determine current tribology research and development work sponsored or conducted by the government. Data base surveys and discussions were conducted to isolate current projects sponsored primarily by 21 different government organizations. These projects were classified by subject, objective, energy relevance, type of research, phenomenon being investigated, variables being studied, type of motion, materials and application. An abstract of each project was prepared which included the classification, sponsor, performing organization and a project description. It was found that current work is primarily materials oriented to meet military requirements. Other than the high temperature programs very few of the tribology projects accomplish energy related objectives.

  7. Assessment Practices in Undergraduate Accounting Programs

    Science.gov (United States)

    Lusher, Anna L.

    2010-01-01

    This study examined accounting program assessment plans at 102 colleges and universities in the United States. The research focused on identifying assessment practices in undergraduate accounting programs by examining the skills and competencies assessed and determining the methods of assessment used. The study also investigated what course and/or…

  8. Assessing the Deployment of Home Visiting: Learning from a State-Wide Survey of Home Visiting Programs.

    Science.gov (United States)

    Fischer, Robert L; Anthony, Elizabeth R; Lalich, Nina; Nevar, Ann; Bakaki, Paul; Koroukian, Siran

    2016-03-01

    Objectives Large-scale planning for health and human services programming is required to inform effective public policy as well as deliver services to meet community needs. The present study demonstrates the value of collecting data directly from deliverers of home visiting programs across a state. This study was conducted in response to the Patient Protection and Affordable Care Act, which requires states to conduct a needs assessment of home visiting programs for pregnant women and young children to receive federal funding. In this paper, we provide a descriptive analysis of a needs assessment of home visiting programs in Ohio. Methods All programs in the state that met the federal definition of home visiting were included in this study. Program staff completed a web-based survey with open- and close-ended questions covering program management, content, goals, and characteristics of the families served. Results Consistent with the research literature, program representatives reported great diversity with regard to program management, reach, eligibility, goals, content, and services delivered, yet consistently conveyed great need for home visiting services across the state. Conclusions Results demonstrate quantitative and qualitative assessments of need have direct implications for public policy. Given the lack of consistency highlighted in Ohio, other states are encouraged to conduct a similar needs assessment to facilitate cross-program and cross-state comparisons. Data could be used to outline a capacity-building and technical assistance agenda to ensure states can effectively meet the need for home visiting in their state. PMID:26576591

  9. Agency Assessments of Compliance Programs

    OpenAIRE

    Joseph Murphy

    2015-01-01

    No matter what an agency may say in speeches about the importance of compliance and ethics efforts, if it ignores good programs in practice, then businesses will correctly read the real message: programs do not count. Joe Murphy (Compliance Strategists)

  10. Industrial Assessment Center Program Impact Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Martin, M.A.

    2000-01-26

    This report presents the results of an evaluation of the U.S. Department of Energy's Industrial Assessment Center (IAC) Program. The purpose of this program is to conduct energy, waste, and productivity assessments for small to medium-sized industrial firms. Assessments are conducted by 30 university-based industrial assessment centers. The purpose of this project was to evaluate energy and cost savings attributable to the assessments, the trained alumni, and the Websites sponsored by this program. How IAC assessments, alumni, and Web-based information may influence industrial energy efficiency decision making was also studied. It is concluded that appreciable energy and cost savings may be attributed to the IAC Program and that the IAC Program has resulted in more active and improved energy-efficiency decision making by industrial firms.

  11. QUEST2: Release 1: Project plan deliverable set

    International Nuclear Information System (INIS)

    This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19

  12. QUEST2: Release 1: Project plan deliverable set

    Energy Technology Data Exchange (ETDEWEB)

    Braaten, F.D.

    1995-02-10

    This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.

  13. Outcomes Assessment in Dental Hygiene Programs.

    Science.gov (United States)

    Grimes, Ellen B.

    1999-01-01

    A survey of 22 dental-hygiene-program directors found that programs routinely and effectively assess student outcomes and use the information for program improvements and to demonstrate accountability. Both policy and faculty/administrative support were deemed important to implementation. Time constraints were a major barrier. Outcomes-assessment…

  14. Brazil : Assessment of the Bolsa Escola Programs

    OpenAIRE

    World Bank

    2001-01-01

    The report assesses the "Bolsa Escola" programs in Brazil, which are poverty-targeted social assistance programs, that provide cash grants to poor families with school-age children between the ages of seven to fourteen. These programs aim at increasing educational attainment, to reduce current, and future poverty, as well as child labor, and, implicitly, to act as a partial safety net. The...

  15. Assessing Program Needs and Planning Change

    OpenAIRE

    Rowan-Szal, Grace A.; Greener, Jack M.; Joe, George W.; Dwayne Simpson, D.

    2007-01-01

    Assessments of treatment staff training needs, preferences, and barriers can help guide and improve training activities and transfer of evidence-based technologies into clinical practice. The TCU Program Training Needs (PTN) assessment consists of 54 items organized into seven domains: Program Facilities and Climate, Program Computer Resources, Staff Training Needs, Preferences for Training Content, Preferences for Training Strategy, Training Barriers, and Satisfaction with Training. Data col...

  16. Moldova Financial Sector Assessment Program

    OpenAIRE

    World Bank, (WB)

    2014-01-01

    This assessment reviews the regulatory and supervisory developments in the insurance sector of Moldova. The current assessment is benchmarked against the insurance core principles (ICPs) issued by the International Association of Insurance Supervisors (IAIS) in October 2011 and revised in 2012. The ICPs apply to all insurers, whether private or state-owned. Specific principles apply to the ...

  17. Short-term natural gas deliverability from the Western Canada Sedimentary Basin 2000-2002

    International Nuclear Information System (INIS)

    Factors which affect natural gas supply in the short term are discussed and a forecast for deliverability to the year 2002 is provided as part of the ongoing effort by the National Energy Board to provide analyses of the major energy commodities on either an individual or integrated commodity basis. The objective of these energy market assessment reports is to advance the understanding of the short-term supply situation by reviewing recent trends in the production characteristics of the Western Canada Sedimentary Basin and to update previous reports on short-term deliverability. This report focuses on a review of producing characteristics of natural gas wells from 1990 to 1999. These producing characteristics are then combined with forecasts of drilling activity in order to generate a forecast of natural gas deliverability from 2000 to 2002. Two key trends were identified during the review process. First, recently drilled wells were found to produce at lower rates than wells drilled more than five years ago; second, production from these wells were shown to decline more quickly than production from older wells. Based on these observations, it was concluded that future wells will be generally less productive than wells which were drilled a few years ago, therefore, more wells will have to be drilled to offset production declines from existing gas wells if deliverability is to be maintained or increased. The National Energy Board expects 8,100 wells to be drilled in 2000, followed by 8,700 natural gas wells in 2001 and 8,900 in 2002. A shift in drilling activity to more prolific areas located in the western and northern parts of the Western Canada Sedimentary Basin is also expected. Based on these estimates of expected drilling activity, total deliverability is projected to increase from 465 million cubic feet per day in 1999 to 495 million cubic feet in 2002. Specialized statistics and forecast data are provided in the appendices. 3 tabs., 11 figs., 6 appendices

  18. Tactical Vulnerability Assessment Training Program

    International Nuclear Information System (INIS)

    The Department of Energy sponsors a 9-day training program for individuals who are responsible for evaluating and planning safeguards systems and for preparing DOE Master and Security Agreements (MSSAs). These agreements between DOE headquarters and operations offices establish required levels of protection. The curriculum includes: (1) the nature of potential insider and outsider threats involving theft or diversion of special nuclear material, (2) use of computerized tools for evaluating the effectiveness of physical protection and material control and accountability systems, and (3) methods for analyzing the benefits and costs of safeguards improvements and for setting priorities among proposed upgrades. The training program is varied and high interactive. Presentations are intermixed with class discussions and ''hands-on'' analysis using computer tools. At the end of the program, participants demonstrate what they have learned in a two-and-one-half day ''field exercise,'' which is conducted on a facility scale-model. The training program has been conducted six times and has been attended by representatives of all DOE facilities. Additional sessions are planned at four-month intervals. This paper describes the training program, use of the tools in preparing MSSAs for various DOE sites, and recent extensions and refinements of the evaluation tools

  19. Tactical Vulnerability Assessment Training Program

    International Nuclear Information System (INIS)

    The Department of Energy sponsors a 9-day training program for individual who are responsible for evaluating and planning safeguards systems and for preparing DOE Master and Security Agreements (MSSAs). These agreements between DOE headquarters and operations offices establish required levels of protection. The curriculum includes: (1) the nature of potential insider and outsider threats involving theft or diversion of special nuclear material, (2) use of computerized tools for evaluating the effectiveness of physical protection and material control and acoountability systems, and (3) methods for analyzing the benefits and costs of safeguards improvements and for setting priorities among proposed upgrades. The training program is varied and highly interactive. Presentations are intermixed with class discussions and ''hands-on'' analysis using computer tools. At the end of the program, participants demonstrate what they have learned in a two-and-one-half day ''field excercise,'' which is conducted on a facility scale-model. The training programs has been conducted six times and has been attended by representatives of all DOE facilities. Additional sessions are planned at four-month intervals. This paper describes the training program, use of the tools in preparing MSSAs for various DOE sites, and recent extensions and refinements of the evaluation tools

  20. Specification of the Legal Knowledge Interchange Format: Deliverable 1.1

    OpenAIRE

    Boer, A. de; Di Bello, M.; Berg, van den, W.; Gordon, T; Förhécz, A.; Vas, R.

    2007-01-01

    The main technical objectives of work package 1 are to develop a first version of a Legal Knowledge Interchange Format (LKIF), building upon emerging XML-based standards of the Semantic Web, including RDF and OWL, and Application Program Interfaces (APIs) for interacting with legal knowledge systems. The LKIF will apply the state of the art in the field of Artificial Intelligence and Law, taking into account business and application requirements. This deliverable reports on the specification ...

  1. Reading assessment and training program

    International Nuclear Information System (INIS)

    The objective was to ensure ourselves and the general public that the workers in the Nuclear Materials Processing Department (NMPD) could read, follow, and understand procedures. Procedures were randomly selected and analyzed for reading levels. A tenth grade reading level was established as the standard for all NMPD employees. Employees were tested to determine reading levels and approximately 12% could not read at the target level. A Procedure Walk-Through Evaluation was administered to each person not reaching tenth grade reading level. This was a job performance measure given to ensure that the worker was competent in his/her present job, and should remain there while completing reading training. A mandatory Reading Training Program utilizing Computer Based Training was established. This program is self-paced, individualized instruction and provided to the worker on Company time. Results of the CBT Program have been very good. Instruction is supplemented with test-taking skills seminars, practice exams, individual conferences with their own reading specialist, and some self-directed study books. This paper describes the program at Savannah River Site

  2. Colon Cancer Risk Assessment - Gauss Program

    Science.gov (United States)

    An executable file (in GAUSS) that projects absolute colon cancer risk (with confidence intervals) according to NCI’s Colorectal Cancer Risk Assessment Tool (CCRAT) algorithm. GAUSS is not needed to run the program.

  3. Influences Determining European Coal Seam Gas Deliverability

    Science.gov (United States)

    Clark, G.

    2009-04-01

    Technically the coal basins of Europe have generated significant Gas In Place figures that has historically generated investor's interest in the development of this potential coal seam gas (CSG) resource. In the early 1980's, a wave of international, principally American, companies arrived, established themselves, drilled and then left with a poor record of success and disappointed investors. Recently a second wave of investment started after 2002, with the smaller companies leading the charge but have the lesson been learned from the past failures? To select a CSG investment project the common European approach has been to: 1. Find an old mining region; 2. Look to see if it had a coal mine methane gas problem; 3. Look for the non-mined coal seams; and 4. Peg the land. This method is perhaps the reason why the history of CSG exploration in Europe is such a disappointment as generally the coal mining regions of Europe do not have commercial CSG reservoir attributes. As a result, investors and governments have lost confidence that CSG will be a commercial success in Europe. New European specific principles for the determination of commercial CSG prospects have had to be delineated that allow for the selection of coal basins that have a strong technical case for deliverability. This will result in the return of investor confidence.

  4. Deliverable 3.2. EU Project Open Science Link

    OpenAIRE

    Hugelier, Sara; Janssens, Marie-Christine; Van den Boom, Freya; Verhenneman, Griet

    2015-01-01

    The objective of this deliverable is to clarify the legal state of the art and rules applicable to the OpenScienceLink project and to ensure that the development and workings of the OpenScienceLink platform are compatible with the different regulatory frameworks This deliverable should provide a clear description and explanation of the applicable legal framework to the OpenScienceLink platform, and more in general, the legal aspects of open access to research data.

  5. Advanced automotive diesel assessment program

    Science.gov (United States)

    Sekar, R.; Tozzi, L.

    1983-01-01

    Cummins Engine Company completed an analytical study to identify an advanced automotive (light duty) diesel (AAD) power plant for a 3,000-pound passenger car. The study resulted in the definition of a revolutionary diesel engine with several novel features. A 3,000-pound car with this engine is predicted to give 96.3, 72.2, and 78.8 MPG in highway, city, and combined highway-city driving, respectively. This compares with current diesel powered cars yielding 41.7, 35.0, and 37.7 MPG. The time for 0-60 MPH acceleration is 13.9 sec. compared to the baseline of 15.2 sec. Four technology areas were identified as crucial in bringing this concept to fruition. They are: (1) part-load preheating, (2) positive displacement compounding, (3) spark assisted diesel combustion system, and (4) piston development for adiabatic, oilless diesel engine. Marketing and planning studies indicate that an aggressive program with significant commitment could result in a production car in 10 years from the date of commencement.

  6. Environmental stress and assessment program

    International Nuclear Information System (INIS)

    Research progress is reported in sections entitled: Savannah River Plant (SRP) studies provide general models for thermal research; in vivo studies of thermal stabilities of cattail isozymes reveal interspecific differences; thermal regimes in Par Pond have little effect on micronutrient uptake by cattails; continued tree kill in the SRP swamp may have an adverse impact on the swamp's cooling capabilities; Par Pond provides understanding of complexity of lake ecosystems affected by thermal effluents; temperature affects size, species distribution, and emergence date of dragonfly larvae; the midge subcommunity in Par Pond maintains relative integrity across a multi-faceted environmental gradient; temperature does not alter contribution of predators to community stability; habitat affects enzyme activity levels in natural populations of Gambusia affinis; studies of large-mouth bass in Par Pond system reveal lipid cycles; long-term turtle research provides information on survivorship and longevity; data on SRP watersnakes contribute to understanding of sexual dimorphism in animals; terrestrial drift fences and pitfall traps prove to be an effective technique for quantitative sampling of animal populations; and, Steel Creek targeted for environmental assessment

  7. Regional Environmental Monitoring and Assessment Program Data (REMAP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Regional Environmental Monitoring and Assessment Program (REMAP) was initiated to test the applicability of the Environmental Monitoring and Assessment Program...

  8. Environmental Compliance Audit& Assessment Program Manual

    Energy Technology Data Exchange (ETDEWEB)

    Thorson, Patrick; Baskin, David; Borglin, Ned; Fox, Robert; Wahl, Linnea; Hatayama, Howard; Pauer, Ronald

    2009-03-13

    This document describes the elements, schedule, roles, and responsibilities of the Lawrence Berkeley National Laboratory (LBNL) Environmental Compliance Audit & Assessment Program (ECAAP). The ECAAP has been developed to meet the requirements of DOE Order 450.1A,1 and Executive Order 13423.2 These referenced Orders stipulate that government agencies must develop environmental compliance audit programs to monitor and improve compliance with environmental regulations. As stated specifically in the DOE Order, as a part of a DOE facility's Environmental Management System (EMS), 'An environmental compliance audit and review program that identifies compliance deficiencies and root causes of non-compliance' shall be developed and implemented. The ECAAP has also been developed to satisfy LBNL's institutional technical assurance assessment requirements promulgated in the Environment, Safety and Health (ES&H) Self-Assessment Program (LBNL/PUB-5344) and described by the ES&H Technical Assurance Program (TAP) Manual (LBNL/PUB-913E). The ES&H TAP Manual provides the framework for systematic reviews of ES&H programs with the intent to provide assurance that these programs comply with their guiding regulations, are effective, and are properly implemented. As required by the DOE and Executive Orders and by LBNL's TAP, the goal of the ECAAP is to identify environmental regulatory compliance deficiencies and to determine their respective causes. The ECAAP then provides a means of correcting any deficiencies identified, and leads to continually improving environmental compliance performance.

  9. Inventors Center of Michigan Technical Assessment Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The Technical Assessment Program at the Inventors Center of Michigan is designed to provide independent inventors with a reliable assessment of the technical merits of their proposed inventions. Using faculty from within Ferris State University's College of Technology an assessment process examines the inventor's assumptions, documentation, and prototypes, as well as, reviewing patent search results and technical literature to provide the inventor with a written report on the technical aspects of the proposed invention. The forms for applying for a technical assessment of an invention are included.

  10. Assessment of a cancer screening program.

    Science.gov (United States)

    Rabeneck, Linda; Lansdorp-Vogelaar, Iris

    2015-12-01

    Several Asian countries are implementing nationwide cancer screening programs. Assessment of the effectiveness of these programs is critical to their success as this is the only way to ensure that the benefits of screening outweigh the harms. In this paper we focus on colorectal cancer (CRC) screening to illustrate the principles of screening program assessment. The International Agency for Research on Cancer (IARC) has defined organized screening, distinguishing it from opportunistic screening. The key advantage of organized screening is that it provides greater protection against the possible harms of screening. Since screening is a process, not simply a test, the effectiveness of a program depends on the quality of each step in the cancer screening process. The evaluation of long-term screening program outcomes (CRC incidence and mortality) will not be observable for many years, given the time it takes to plan, pilot and implement a program. However, early performance indicators of the impact of screening should be monitored to give an early indication whether the program is on track. The European Union (EU) has recommended a minimum dataset to be collected and reported regularly by a screening program. Using information from these data tables, early performance indicators can be generated (e.g., participation rate, proportion of screen-detected cancers that are early-stage). Subsequently, modeling the natural history of the disease can be very helpful to estimate long-term outcomes, making use of these directly measured early performance indicators. Modeling can also be used to estimate the cost-effectiveness of a screening program and the potential impact of changes in policy, as illustrated by its recent use in the Netherlands to change the definition of a positive fecal immunochemical test (FIT) for the CRC screening program. Programs should consider modeling as an important component of screening program evaluation. PMID:26651258

  11. Possibilities for a valorisation of geomorphologic research deliverables

    Science.gov (United States)

    Geilhausen, M.; Götz, J.; Otto, J.-C.; Schrott, L.

    2009-04-01

    Many geomorphological studies focus on fundamental research questions in large parts, although there are lots of applied fields like landslide hazard assessment or water framework directive. As fundamental research is a common property, their outcomes should be more "open" and accessible to the public. This means that scientists have to find new ways presenting their results and outcomes besides publishing in scientific journals. This paper shows possibilities for a valorisation of geomorphologic research deliverables using print as well as digital media. Geotrails explain remarkable and exciting landscape features using information boards and become more and more popular and important for tourism in many parts of the world. With the growing interest in environmental change and outdoor activities, print media like field guides reach an increasing number of people. Field guides and Geotrails can be coupled in order to arise awareness about geomorphological landforms and to deliver more specific information on the site beyond the information given on the boards in the field. As field guides are designed for the general public they can be used for educational purposes as well. Today, this information can also be found in the internet offering virtual trips through landscapes using dynamic maps. Here, server side GIS technologies (WebGIS) using standardised interfaces provide new possibilities to show geomorphic data to the public and to share them with the scientific community. Furthermore, data formats like XML or KML are powerful tools for data exchange and can be used in interactive data viewers like Google Earth. We will present the Geotrail "Geomorphologischer Lehrpfad am Fuße der Zugspitze. Das Reintal - Eine Wanderung durch Raum und Zeit" (Bavarian Alps, Germany). Additionally, three geomorphologic WebGIS applications (Geomorphologic map Turtmanntal, Permafrostmap of Austria, Geomorphologic maps of Germany) will exemplify how geomorphologic information and

  12. FY2005 Progress Summary and FY2006 Program Plan Statement of Work and Deliverables for Development of High Average Power Diode-Pumped Solid State Lasers, and Complementary Technologies, for Applications in Energy and Defense

    Energy Technology Data Exchange (ETDEWEB)

    Ebbers, C

    2006-03-24

    The primary focus this year was to operate the system with two amplifiers populated with and pumped by eight high power diode arrays. The system was operated for extended run periods which enabled average power testing of components, diagnostics, and controls. These tests were highly successful, with a demonstrated energy level of over 55 joules for 4 cumulative hours at a repetition rate of 10 Hz (average power 0.55 kW). In addition, high average power second harmonic generation was demonstrated, achieving 227 W of 523.5 nm light (22.7 J, 10 Hz, 15 ns, 30 minutes) Plans to achieve higher energy levels and average powers are in progress. The dual amplifier system utilizes a 4-pass optical arrangement. The Yb:S-FAP slabs were mounted in aerodynamic aluminum vane structures to allow turbulent helium gas flow across the faces. Diagnostic packages that monitored beam performance were deployed during operation. The laser experiments involved injecting a seed beam from the front end into the system and making four passes through both amplifiers. Beam performance diagnostics monitored the beam on each pass to assess system parameters such as gain and nearfield intensity profiles. This year, an active mirror and wavefront sensor were procured and demonstrated in an off-line facility. The active mirror technology can correct for low order phase distortions at user specified operating conditions (such as repetition rates different than 10 Hz) and is a complementary technology to the static phase plates used in the system for higher order distortions. A picture of the laser system with amplifier No.2 (foreground) and amplifier No.1 (background) is shown in Fig. 1.0.1.1. The control system and diagnostics were recently enhanced for faster processing and allow remote operation of the system. The growth and fabrication of the Yb:S-FAP slabs constituted another major element of our program objectives. Our goal was to produce at least fourteen 4x6 cm2 crystalline slabs. These

  13. Quantitative assessment of protein function prediction programs.

    Science.gov (United States)

    Rodrigues, B N; Steffens, M B R; Raittz, R T; Santos-Weiss, I C R; Marchaukoski, J N

    2015-01-01

    Fast prediction of protein function is essential for high-throughput sequencing analysis. Bioinformatic resources provide cheaper and faster techniques for function prediction and have helped to accelerate the process of protein sequence characterization. In this study, we assessed protein function prediction programs that accept amino acid sequences as input. We analyzed the classification, equality, and similarity between programs, and, additionally, compared program performance. The following programs were selected for our assessment: Blast2GO, InterProScan, PANTHER, Pfam, and ScanProsite. This selection was based on the high number of citations (over 500), fully automatic analysis, and the possibility of returning a single best classification per sequence. We tested these programs using 12 gold standard datasets from four different sources. The gold standard classification of the databases was based on expert analysis, the Protein Data Bank, or the Structure-Function Linkage Database. We found that the miss rate among the programs is globally over 50%. Furthermore, we observed little overlap in the correct predictions from each program. Therefore, a combination of multiple types of sources and methods, including experimental data, protein-protein interaction, and data mining, may be the best way to generate more reliable predictions and decrease the miss rate. PMID:26782400

  14. The California State University Early Assessment Program

    Science.gov (United States)

    Knudson, Ruth E.; Zitzer-Comfort, Carol; Quirk, Matthew; Alexander, Pia

    2008-01-01

    The California State University (CSU) requires entering freshmen to be proficient in English reading and writing, as demonstrated on proficiency measures. Currently, approximately 46 percent of incoming college freshmen need remediation in English reading and writing. To assist these students, CSU instituted an Early Assessment Program (EAP),…

  15. An Assessment of Transfer Program Outcomes.

    Science.gov (United States)

    Kirby, Emily B.

    This paper describes the development of a system for assessing transfer program outcomes (TPO), using the effort at Oakton Community College (OCC) as an example. While originally designed to provide timely information on senior institutions as experienced by transfer students, TPO appeared to do considerably more. System highlights included more…

  16. Radiation detection technology assessment program (RADTAP)

    International Nuclear Information System (INIS)

    The U.S. Customs Service and the U.S. Department of Energy (DOE) conducted a technical and operational assessment of gamma ray radiation detection equipment during the period May 5-16, 1997 at a testing facility in North Carolina. The effort was entitled, ''Radiation Detection Technology Assessment Program (RADTAP)'', and was conducted for the purpose of assessing the applicability, sensitivity and robustness of a diverse suite of gamma ray detection and identification equipment for possible use by Customs and other law enforcement agencies. Thirteen companies entered 25 instruments into the assessment program. All detection equipment entered had to exhibit a minimum sensitivity of 20 micro-R per hour (background included) from a Cesium-137 point source. Isotope identifying spectrometers entered were man portable and operable at room temperature with read-out that could be interpreted by non-technical personnel. Radioactive sources used in the assessment included special nuclear material, industrial and health isotopes. Evaluators included Customs inspectors and technical experts from DOE and Customs. No conclusions or recommendations were issued based on the quantitative and qualitative test results, however, the results of the program provided law enforcement agencies with the necessary data to select equipment that best meets their operational needs and budgets. (author)

  17. FY2002 Progress Summary Program Plan, Statement of Work and Deliverables for Development of High Average Power Diode-Pumped Solid State Lasers, and Complementary Technologies, for Applications in Energy and Defense

    Energy Technology Data Exchange (ETDEWEB)

    Bayramian, A; Bibeau, C; Beach, R; Behrendt, B; Ebbers, C; Latkowski, J; Meier, W; Payne, S; Perkins, J; Schaffers, K; Skulina, K; Ditmire, T; Kelly, J; Waxer, L; Rudi, P; Randles, M; Witter, D; Meissner, H; Merissner, O

    2001-12-13

    The High Average Power Laser Program (HAPL) is a multi-institutional, coordinated effort to develop a high-energy, repetitively pulsed laser system for Inertial Fusion Energy and other DOE and DOD applications. This program is building a laser-fusion energy base to complement the laser-fusion science developed by DOE Defense programs over the past 25 years. The primary institutions responsible for overseeing and coordinating the research activities are the Naval Research Laboratory (NRL) and LLNL. The current LLNL proposal is a companion proposal to that submitted by NRL, for which the driver development element is focused on the krypton fluoride excimer laser option. Aside from the driver development aspect, the NRL and LLNL companion proposals pursue complementary activities with the associated rep-rated laser technologies relating to target fabrication, target injection, final optics, fusion chamber, materials and power plant economics. This report requests continued funding in FY02 to support LLNL in its program to build a 1kW, 100J, diode-pumped, crystalline laser. In addition, research in high gain laser target design, fusion chamber issues and survivability of the final optic element will be pursued. These technologies are crucial to the feasibility of inertial fusion energy power plants and also have relevance in rep-rated stewardship experiments.

  18. Assessment of the NRC Enforcement Program

    International Nuclear Information System (INIS)

    On May 12, 1994, the Executive Director for Operations (EDO) established a Review Team composed of senior NRC managers to re-examine the NRC enforcement program. A copy of the Review Team's charter is enclosed as Appendix A. This report presents the Team's assessment. The purpose of this review effort are: (1) to perform an assessment of the NRC's enforcement program to determine whether the defined purposes of the enforcement program are appropriate; (2) to determine whether the NRC's enforcement practices and procedures for issuing enforcement actions are consistent with those purposes; and (3) to provide recommendations on any changes the Review Team believes advisable. In accordance with its charter, the Review Team considered the following principal issues in conducting its assessment of the enforcement program: the balance between providing deterrence and incentives (both positive and negative) for the identification and correction of violations; the appropriateness of NRC sanctions; whether the commission should seek statutory authority to increase the amount of civil penalties; whether the NRC should use different enforcement policies and practices for different licensees (e.g., materials licensees in contrast to power reactors or large fuel facilities); and whether the commission should establish open enforcement conferences as the normal practice

  19. April 25, 2003, FY2003 Progress Summary and FY2002 Program Plan, Statement of Work and Deliverables for Development of High Average Power Diode-Pumped Solid State Lasers,and Complementary Technologies, for Applications in Energy and Defense

    International Nuclear Information System (INIS)

    The High Average Power Laser Program (HAPL) is a multi-institutional, synergistic effort to develop inertial fusion energy (IFE). This program is building a physics and technology base to complement the laser-fusion science being pursued by DOE Defense programs in support of Stockpile Stewardship. The primary institutions responsible for overseeing and coordinating the research activities are the Naval Research Laboratory (NRL) and Lawrence Livermore National Laboratory (LLNL). The current LLNL proposal is a companion document to the one submitted by NRL, for which the driver development element is focused on the krypton fluoride excimer laser option. The NRL and LLNL proposals also jointly pursue complementary activities with the associated rep-rated laser technologies relating to target fabrication, target injection, final optics, fusion chamber, target physics, materials and power plant economics. This proposal requests continued funding in FY03 to support LLNL in its program to build a 1 kW, 100 J, diode-pumped, crystalline laser, as well as research into high gain fusion target design, fusion chamber issues, and survivability of the final optic element. These technologies are crucial to the feasibility of inertial fusion energy power plants and also have relevance in rep-rated stewardship experiments. The HAPL Program pursues technologies needed for laser-driven IFE. System level considerations indicate that a rep-rated laser technology will be needed, operating at 5-10 Hz. Since a total energy of ∼2 MJ will ultimately be required to achieve suitable target gain with direct drive targets, the architecture must be scaleable. The Mercury Laser is intended to offer such an architecture. Mercury is a solid state laser that incorporates diodes, crystals and gas cooling technologies

  20. April 25, 2003, FY2003 Progress Summary and FY2002 Program Plan, Statement of Work and Deliverables for Development of High Average Power Diode-Pumped Solid State Lasers,and Complementary Technologies, for Applications in Energy and Defense

    Energy Technology Data Exchange (ETDEWEB)

    Meier, W; Bibeau, C

    2005-10-25

    The High Average Power Laser Program (HAPL) is a multi-institutional, synergistic effort to develop inertial fusion energy (IFE). This program is building a physics and technology base to complement the laser-fusion science being pursued by DOE Defense programs in support of Stockpile Stewardship. The primary institutions responsible for overseeing and coordinating the research activities are the Naval Research Laboratory (NRL) and Lawrence Livermore National Laboratory (LLNL). The current LLNL proposal is a companion document to the one submitted by NRL, for which the driver development element is focused on the krypton fluoride excimer laser option. The NRL and LLNL proposals also jointly pursue complementary activities with the associated rep-rated laser technologies relating to target fabrication, target injection, final optics, fusion chamber, target physics, materials and power plant economics. This proposal requests continued funding in FY03 to support LLNL in its program to build a 1 kW, 100 J, diode-pumped, crystalline laser, as well as research into high gain fusion target design, fusion chamber issues, and survivability of the final optic element. These technologies are crucial to the feasibility of inertial fusion energy power plants and also have relevance in rep-rated stewardship experiments. The HAPL Program pursues technologies needed for laser-driven IFE. System level considerations indicate that a rep-rated laser technology will be needed, operating at 5-10 Hz. Since a total energy of {approx}2 MJ will ultimately be required to achieve suitable target gain with direct drive targets, the architecture must be scaleable. The Mercury Laser is intended to offer such an architecture. Mercury is a solid state laser that incorporates diodes, crystals and gas cooling technologies.

  1. Electronuclear's safety culture assessment and enhancement program

    International Nuclear Information System (INIS)

    The present paper describes the Eletronuclear's safety culture assessment and enhancement program. The program was launched by the company's top management one year after the creation of Eletronuclear in 1997, from the merging of two companies with different organizational cultures, the design and engineering company Nuclen and the nuclear directorate of the Utility Furnas, Operator of the Angra1 NPP. The program consisted of an assessment performed internally in 1999 with the support and advice of the IAEA. This assessment, performed with the help of a survey, pooled about 80% of the company's employees. The overall result of the assessment was that a satisfactory level of safety culture existed; however, a number of points with a considerable margin for improvement were also identified. These points were mostly related with behavioural matters such as motivation, stress in the workplace, view of mistakes, handling of conflicts, and last but not least a view by a considerable number of employees that a conflict between safety and production might exist. An Action Plan was established by the company managers to tackle these weak points. This Plan was issued as company guideline by the company's Directorate. The subsequent step was to detail and implement the different actions of the Plan, which is the phase that we are at present. In the detailing of the Action Plan, special care was taken to sum up efforts, avoiding duplication of work or competition with already existing programs. In this process it was identified that the company had a considerable number of initiatives directly related to organizational and safety culture improvement, already operational. These initiatives have been integrated in the detailed Action Plan. A new assessment, for checking the effectiveness of the undertaken actions, is planned for 2003. (author)

  2. Program Plan for Revision of the Z-Area Saltstone Disposal Facility Performance Assessment

    International Nuclear Information System (INIS)

    Savannah River National Laboratory (SRNL) and the Saltstone Project, are embarking on the next revision to the Saltstone Disposal Facility (SDF) performance assessment (PA). This program plan has been prepared to outline the general approach, scope, schedule and resources for the PA revision. The plan briefly describes the task elements of the PA process. It discusses critical PA considerations in the development of conceptual models and interpretation of results. Applicable quality assurance (QA) requirements are identified and the methods for implementing QA for both software and documentation are described. The plan identifies project resources supporting the core team and providing project oversight. Program issues and risks are identified as well as mitigation of those risks. Finally, a preliminary program schedule has been developed and key deliverables identified. A number of significant changes have been implemented since the last PA revision resulting in a new design for future SDF disposal units. This revision will encompass the existing and planned disposal units, PA critical radionuclides and exposure pathways important to SDF performance. An integrated analysis of the overall facility layout, including all disposal units, will be performed to assess the impact of plume overlap on PA results. Finally, a rigorous treatment of uncertainty will be undertaken using probabilistic simulations. This analysis will be reviewed and approved by DOE-SR, DOE-HQ and potentially the Nuclear Regulatory Commission (NRC). This revision will be completed and ready for the start of the DOE review at the end of December 2006. This work supports a Saltstone Vault 2 fee-bearing milestone. This milestone includes completion of the Vault 2 module of the PA revision by the end of FY06

  3. Global Seismic Hazard Assessment Program - GSHAP legacy

    OpenAIRE

    Laurentiu Danciu; Domenico Giardini

    2015-01-01

    Global Seismic Hazard Assessment Program - or simply GSHAP, when launched, almost two decades ago, aimed at establishing a common framework to evaluate the seismic hazard over geographical large-scales, i.e. countries, regions, continents and finally the globe. Its main product, the global seismic hazard map was a milestone, unique at that time and for a decade have served as the main reference worldwide. Today, for most of the Earth’s seismically active regions such Europe, Northern and Sout...

  4. Oak Ridge TNS Program: technical needs assessment

    International Nuclear Information System (INIS)

    This document highlights the technical requirements of the key subsystems of the Reference Design for The Next Step (TNS) and presents a preliminary assessment of the adequacy of the technical capabilities available to satisfy these requirements. Additional information on the Reference Design and the FY 1978 TNS Program activities can be found in the associated technical memoranda, ORNL/TM-6720, ORNL/TM-6721, and ORNL/TM-6723 - ORNL/TM-6733

  5. ELECTRIC INFRASTRUCTURE TECHNOLOGY, TRAINING, AND ASSESSMENT PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    TREMEL, CHARLES L

    2007-06-28

    The objective of this Electric Infrastructure Technology, Training and Assessment Program was to enhance the reliability of electricity delivery through engineering integration of real-time technologies for wide-area applications enabling timely monitoring and management of grid operations. The technologies developed, integrated, tested and demonstrated will be incorporated into grid operations to assist in the implementation of performance-based protection/preventive measures into the existing electric utility infrastructure. This proactive approach will provide benefits of reduced cost and improved reliability over the typical schedule-based and as needed maintenance programs currently performed by utilities. Historically, utilities have relied on maintenance and inspection programs to diagnose equipment failures and have used the limited circuit isolation devices, such as distribution main circuit breakers to identify abnormal system performance. With respect to reliable problem identification, customer calls to utility service centers are often the sole means for utilities to identify problem occurrences and determine restoration methodologies. Furthermore, monitoring and control functions of equipment and circuits are lacking; thus preventing timely detection and response to customer outages. Finally, the two-way flow of real-time system information is deficient, depriving decision makers of key information required to effectively manage and control current electric grid demands to provide reliable customer service in abnormal situations. This Program focused on advancing technologies and the engineering integration required to incorporate them into the electric grid operations to enhance electrical system reliability and reduce utility operating costs.

  6. Assessment of the Fusion Energy Sciences Program. Final Report

    International Nuclear Information System (INIS)

    An assessment of the Office of Fusion Energy Sciences (OFES) program with guidance for future program strategy. The overall objective of this study is to prepare an independent assessment of the scientific quality of the Office of Fusion Energy Sciences program at the Department of Energy. The Fusion Science Assessment Committee (FuSAC) has been appointed to conduct this study

  7. Automatic Test-Based Assessment of Programming: A Review

    Science.gov (United States)

    Douce, Christopher; Livingstone, David; Orwell, James

    2005-01-01

    Systems that automatically assess student programming assignments have been designed and used for over forty years. Systems that objectively test and mark student programming work were developed simultaneously with programming assessment in the computer science curriculum. This article reviews a number of influential automatic assessment systems,…

  8. Bioclim Deliverable D1: environmental change analysis

    International Nuclear Information System (INIS)

    The BIOCLIM project on modelling sequential Biosphere systems under Climate change for radioactive waste disposal is part of the EURATOM fifth European framework programme. The project was launched in October 2000 for a three-year period. The project aims at providing a scientific basis and practical methodology for assessing the possible long term impacts on the safety of radioactive waste repositories in deep formations due to climate and environmental change. The project brings together a number of representatives from both European radioactive waste management organisations which have national responsibilities for the safe disposal of radioactive waste, either as disposers or regulators, and several highly experienced climate research teams. In particular, BIOCLIM aims to address the important objective of how to represent the development of future biosphere systems by addressing both how to model long-term climate change, the relevant environmental consequences of such changes and the implementation of a sequential approach to such changes. The results from the development of this sophisticated approach will be of great benefit for improving long term radiological impact calculations and the information presented in a safety case. Simulations will be conducted to represent the time series of long-term climate in three European areas within which disposal sites may be established (i.e. Central/Southern Spain, Northeast of France and Central Britain). Two complementary strategies will provide representations of future climate predictions together with associated vegetation patterns using either an analysis of distinct climate states or a continuous climate simulation over at least one glacial-interglacial cycle and possibly for other selected periods over the next 1,000,000 years. These results will be used to derive the characteristics of possible future human environments (i.e. biosphere systems) through which radionuclides, emerging from the repository, may

  9. Skill Gap Analysis for Improved Skills and Quality Deliverables

    Directory of Open Access Journals (Sweden)

    Mallikarjun Koripadu

    2014-10-01

    Full Text Available With a growing pressure in identifying the skilled resources in Clinical Data Management (CDM world of clinical research organizations, to provide the quality deliverables most of the CDM organizations are planning to improve the skills within the organization. In changing CDM landscape the ability to build, manage and leverage the skills of clinical data managers is very critical and important. Within CDM to proactively identify, analyze and address skill gaps for all the roles involved. In addition to domain skills, the evolving role of a clinical data manager demands diverse skill sets such as project management, six sigma, analytical, decision making, communication etc. This article proposes a methodology of skill gap analysis (SGA management as one of the potential solutions to the big skill challenge that CDM is gearing up for bridging the gap of skills. This would in turn strength the CDM capability, scalability, consistency across geographies along with improved productivity and quality of deliverables

  10. Deliverable 1.2.1 Market Analysis and Business Plan

    DEFF Research Database (Denmark)

    Peterson, Carrie Beth

    2009-01-01

    Deliverable 1.2.1 - Market Analysis and Business Plan The main objective of this deliverable is to provide a short overview of 4 communities involved in the pilots, envisaged type of solutions and architectures to be deployed (chapter 2) and market analysis at regional level (chapter 3) with...... related business cases. The Market analysis will provide an overview of market requirements, current status and opportunities for the pilot service that will be provided in the context of ISISEMD. This will be realised by performing detailed studies on various sources. Proposals for business modelling and...... business cases (chapter 4) will rely on the concept of value chains. Value chains typically consist of several providers, which together produce a complex product or service....

  11. COLOMBO Deliverable 5.3: Traffic Light Algorithm Evaluation System

    OpenAIRE

    Krajzewicz, Daniel; Blokpoel, Robbin; Niebel, Wolfgang; Lu, Ting; Hebenstreit, Cornelia; Reixis, Martin; Bieker, Laura

    2015-01-01

    Deliverable 5.3 describes the work performed in Task 5.3 on a “Traffic Light Algorithm Evaluation System”. This work includes two approaches. The first is the derivation of a single performance indicator that combines conventional traffic efficiency measures, measures describing how drivers perceive the traffic state as well as environmental measures. The work is accompanied by a summary on nowadays benchmarking of traffic lights. The developed performance indicator may be used for both, benc...

  12. 76 FR 21977 - Applications for New Awards; Enhanced Assessment Instruments Grants Program-Enhanced Assessment...

    Science.gov (United States)

    2011-04-19

    ...-based academic assessments. Absolute Priority 5--English Language Proficiency Assessment System. To meet... on the English language proficiency assessment; English learners by disability status; and English..., and language instruction education programs. (d) Compatibility. The assessment system must...

  13. Gas Deliverability Model with Different Vertical Wells Properties

    Directory of Open Access Journals (Sweden)

    L. Mucharam

    2003-11-01

    Full Text Available We present here a gas deliverability computational model for single reservoir with multi wells. The questions of how long the gas delivery can be sustained and how to estimate the plateau time are discussed here. In order to answer such a question, in this case, a coupling method which consists of material balance method and gas flow equation method is developed by assuming no water influx in the reservoir. Given the rate and the minimum pressure of gas at the processing plant, the gas pressure at the wellhead and at the bottom hole can be obtained. From here, the estimation of the gas deliverability can be done. In this paper we obtain a computational method which gives direct computation for pressure drop from the processing plant to the wells, taking into account different well behavior. Here AOF technique is used for obtaining gas rate in each well. Further Tian & Adewumi correlation is applied for pressure drop model along vertical and horizontal pipes and Runge-Kutta method is chosen to compute the well head and bottom hole pressures in each well which then being used to estimate the plateau times. We obtain here direct computational scheme of gas deliverability from reservoir to processing plant for single reservoir with multi-wells properties. Computational results give different profiles (i.e. gas rate, plateau and production time, etc for each well. Further by selecting proper flow rate reduction, the flow distribution after plateau time to sustain the delivery is computed for each well.

  14. Global Seismic Hazard Assessment Program - GSHAP legacy

    Directory of Open Access Journals (Sweden)

    Laurentiu Danciu

    2015-04-01

    Full Text Available Global Seismic Hazard Assessment Program - or simply GSHAP, when launched, almost two decades ago, aimed at establishing a common framework to evaluate the seismic hazard over geographical large-scales, i.e. countries, regions, continents and finally the globe. Its main product, the global seismic hazard map was a milestone, unique at that time and for a decade have served as the main reference worldwide. Today, for most of the Earth’s seismically active regions such Europe, Northern and Southern America, Central and South-East Asia, Japan, Australia, New Zealand, the GSHAP seismic hazard map is outdated. The rapid increase of the new data, advance on the earthquake process knowledge, technological progress, both hardware and software, contributed all in updates of the seismic hazard models. We present herein, a short retrospective overview of the achievements as well as the pitfalls of the GSHAP. Further, we describe the next generation of seismic hazard models, as elaborated within the Global Earthquake Model, regional programs: the 2013 European Seismic Hazard Model, the 2014 Earthquake Model for Middle East, and the 2015 Earthquake Model of Central Asia. Later, the main characteristics of these regional models are summarized and the new datasets fully harmonized across national borders are illustrated for the first time after the GSHAP completion.

  15. Environmental Assessment Radioactive Source Recovery Program

    International Nuclear Information System (INIS)

    In a response to potential risks to public health and safety, the U.S. Department of Energy (DOE) is evaluating the recovery of sealed neutron sources under the Radioactive Source Recovery Program (RSRP). This proposed program would enhance the DOE's and the U.S. Nuclear Regulatory Commission's (NRC's) joint capabilities in the safe management of commercially held radioactive source materials. Currently there are no federal or commercial options for the recovery, storage, or disposal of sealed neutron sources. This Environmental Assessment (EA) analyzes the potential environmental impacts that would be expected to occur if the DOE were to implement a program for the receipt and recovery at the Los Alamos National Laboratory (LANL), Los Alamos, New Mexico, of unwanted and excess plutonium-beryllium (238Pu-Be) and americium-beryllium (241Am-Be) sealed neutron sources. About 1 kg (2.2 lb) plutonium and 3 kg (6.6 lb) americium would be recovered over a 15-year project. Personnel at LANL would receive neutron sources from companies, universities, source brokers, and government agencies across the country. These neutron sources would be temporarily stored in floor holes at the CMR Hot Cell Facility. Recovery reduces the neutron emissions from the source material and refers to a process by which: (1) the stainless steel cladding is removed from the neutron source material, (2) the mixture of the radioactive material (Pu-238 or Am-241) and beryllium that constitutes the neutron source material is chemically separated (recovered), and (3) the recovered Pu-238 or Am-241 is converted to an oxide form (238PuO2 or 241AmO2). The proposed action would include placing the 238PuO2 or 241AmO2 in interim storage in a special nuclear material vault at the LANL Plutonium Facility

  16. NANA Geothermal Assessment Program Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Jay Hermanson

    2010-06-22

    In 2008, NANA Regional Corporation (NRC) assessed geothermal energy potential in the NANA region for both heat and/or electricity production. The Geothermal Assessment Project (GAP) was a systematic process that looked at community resources and the community's capacity and desire to develop these resources. In October 2007, the US Department of Energy's Tribal Energy Program awarded grant DE-FG36-07GO17075 to NRC for the GAP studies. Two moderately remote sites in the NANA region were judged to have the most potential for geothermal development: (1) Granite Mountain, about 40 miles south of Buckland, and (2) the Division Hot Springs area in the Purcell Mountains, about 40 miles south of Shungnak and Kobuk. Data were collected on-site at Granite Mountain Hot Springs in September 2009, and at Division Hot Springs in April 2010. Although both target geothermal areas could be further investigated with a variety of exploration techniques such as a remote sensing study, a soil geochemical study, or ground-based geophysical surveys, it was recommended that on-site or direct heat use development options are more attractive at this time, rather than investigations aimed more at electric power generation.

  17. Cost savings deliverables and criteria for the OST technology decision process

    Energy Technology Data Exchange (ETDEWEB)

    McCown, A.

    1997-04-01

    This document has been prepared to assist focus area (FA) technical and management teams in understanding the cost savings deliverables associated with a technology system during its research and development (R and D) phases. It discusses the usefulness of cost analysis in the decision-making process, and asserts that the level of confidence and data quality of a cost analysis is proportional to the maturity of the technology system`s development life cycle. Suggestions of specific investment criteria or cost savings metrics that a FA might levy on individual research projects are made but the final form of these elements should be stipulated by the FA management based on their rationale for a successful technology development project. Also, cost savings deliverables for a single FA will be more detailed than those for management of the Office of Science and Technology (OST). For example, OST management may want an analysis of the overall return on investment for each FA, while the FA program manager may want this analysis and the return on investment metrics for each technology research activity the FA supports.

  18. Handbook of efficient recommandations: Public Deliverable D6.4, PRIMA collaborative project, EU 7th Framework Programme, contract no. 212345

    OpenAIRE

    Meyer, B.C.; Laplana, R.; Raley, M.; Baqueiro, O.; Kopeva, D.; Hautdidier, B.

    2011-01-01

    The Deliverable 6.4 “Handbook of efficient recommendations” deals with the main methodological developments in the context of screening, scoping and Sustainability Impact Assessment (SIA) developed and discussed in PRIMA. The main topics of this handbook deal with key aspects of the methodological enhancement of Impact Assessment within the context of experiences in Environmental Impact Assessment and Strategic Environmental Assessment. Key research is linked to the questions abou...

  19. 77 FR 45650 - Interior Fire Program Assessment 2012

    Science.gov (United States)

    2012-08-01

    ... Office of the Secretary Interior Fire Program Assessment 2012 AGENCY: Office of Wildland Fire, Interior... Assessment 2012; and (2) potential options being considered as a result of the Interior Fire Program Assessment 2012. DATES: See the SUPPLEMENTARY INFORMATION section of this notice for consultation...

  20. ITRAP. Illicit trafficking radiation detection assessment program

    International Nuclear Information System (INIS)

    Illicit trafficking in nuclear materials (nuclear criminality) has become more and more a problem, due to the circulation of the a high number of radioactive sources and the big amount of nuclear material, particularly, caused by the changes of the organisational infrastructures to supervise these material within the successor states of the former Soviet Union. The IAEA data base counts at present more than 300 verified cases. The endangering cased thereby ranges from possible health defect for the publication to terrorists activities and production of nuclear weapons. In addition to the primary criminal reasons the illegal deposal of radioactive sources as salvage, scrap and others show a further problem, which has lead to severe accidents and lethal effects in the past (e.g. Goiana, Mexiko). As the study ITRAP (Illicit Trafficking Radiation Assessment Program) can show, also in Austria the cases of partly considerable contaminated scrap transports from neighbouring countries exists. Some countries have already under taken countermeasures (e.g. Monitoring at the Finnish-Russian and German-Polish border, border monitoring in Italy). The International Atomic Energy Agency (IAEA) has reacted on this actual problem by setting up a new program to fight against nuclear criminality and has suggested a pilot study for the practical test of border monitoring systems. Aim of the study was to work out the technical requirements and the practicability of an useful monitoring system at border crossings. The results of the study will be offered by the IAEA to the member states as international recommendations for border monitoring systems. (author)

  1. A CAD (Classroom Assessment Design) of a Computer Programming Course

    Science.gov (United States)

    Hawi, Nazir S.

    2012-01-01

    This paper presents a CAD (classroom assessment design) of an entry-level undergraduate computer programming course "Computer Programming I". CAD has been the product of a long experience in teaching computer programming courses including teaching "Computer Programming I" 22 times. Each semester, CAD is evaluated and modified for the subsequent…

  2. NANA Wind Resource Assessment Program Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Jay Hermanson

    2010-09-23

    NANA Regional Corporation (NRC) of northwest Alaska is located in an area with abundant wind energy resources. In 2007, NRC was awarded grant DE-FG36-07GO17076 by the US Department of Energy's Tribal Energy Program for funding a Wind Resource Assessment Project (WRAP) for the NANA region. The NANA region, including Kotzebue Electric Association (KEA) and Alaska Village Electric Cooperative (AVEC) have been national leaders at developing, designing, building, and operating wind-diesel hybrid systems in Kotzebue (starting in 1996) and Selawik (2002). Promising sites for the development of new wind energy projects in the region have been identified by the WRAP, including Buckland, Deering, and the Kivalina/Red Dog Mine Port Area. Ambler, Shungnak, Kobuk, Kiana, Noorvik & Noatak were determined to have poor wind resources at sites in or very near each community. However, all five of these communities may have better wind resources atop hills or at sites with slightly higher elevations several miles away.

  3. The Program Sustainability Assessment Tool: A New Instrument for Public Health Programs

    OpenAIRE

    Luke, Douglas A.; Calhoun, Annaliese; Robichaux, Christopher B.; Elliott, Michael B.; Moreland-Russell, Sarah

    2014-01-01

    Introduction Public health programs can deliver benefits only if they are able to sustain programs, policies, and activities over time. Although numerous sustainability frameworks and models have been developed, there are almost no assessment tools that have demonstrated reliability or validity or have been widely disseminated. We present the Program Sustainability Assessment Tool (PSAT), a new and reliable instrument for assessing the capacity for program sustainability of various public hea...

  4. Deliverable D2.1 - State of the Art in Tools for Creativity

    DEFF Research Database (Denmark)

    Grube, Per-Pascal; Schmid, Klaus; Dolog, Peter;

    2008-01-01

    This deliverable provides a survey of creativity techniques that have been developed over time. It provides a reference model for characterizing them as a basis for selecting techniques that are particularly appropriate for the idSpace-project. The deliverable also surveys existing creativity tools...... and characterizes them in terms of underlying techniques. Finally, the deliverable describes requirements for the idSpace-environment and discusses to what extend it can benefit from existing tools....

  5. Collected Wisdom: Assessment Tools for Computer Science Programs

    Science.gov (United States)

    Sanders, Kathryn E.; McCartney, Robert

    2004-01-01

    In this paper, we investigate the question of what assessment tools are being used in practice by United States computing programs and what the faculty doing the assessment think of the tools they use. After presenting some background with regard to the design, implementation, and use of assessment, with particular attention to assessment tools,…

  6. Assessment Benchmarks for an Alternative Certification Program

    Science.gov (United States)

    Denton, Jon; Davis, Trina; Smith, Ben; Beason, Lynn; Graham, Diane; Strader, Arlen

    2008-01-01

    The Accelerate Online/OPTIONS alternative certification program provides those possessing a degree an option leading to certification that can be completed in 18 months. The program consists of an online curriculum, an early field experience, and a year-long paid internship. To determine program effectiveness across five years, five benchmark…

  7. Self-assessment program implementation plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  8. Syringe exchange programs in Brazil: preliminary assessment of 45 programs

    Directory of Open Access Journals (Sweden)

    Fonseca Elize Massard da

    2006-01-01

    Full Text Available The present study aims to evaluate the current operation of Brazilian syringe exchange programs (SEP. After consulting national and regional networks of people working in projects/ programs aiming to reduce drug-related harm, we identified 134 potential participant programs. Unfortunately, only 45 SEPs answered a survey, even after repeated attempts. The survey addressed: coverage, funding, procurement of basic supplies, managerial capacity, and the local political environment. Findings were triangulated with in-depth interviews with key informants. The main findings included: satisfactory adherence to the initiatives and adequate documentation, but deficiencies in terms of coverage and monitoring, and uneven procurement of resources. Program personnel work mostly on a provisional basis, despite the efforts of local coordinators. Most programs are funded by the National STDs/AIDS Program. A comprehensive agenda aiming to improve current operations should include: concerted efforts to improve local and regional databanks, incentives/sanctions toward full accountability of initiatives carried by the programs, and a genuine culture of monitoring and evaluation.

  9. Syringe exchange programs in Brazil: preliminary assessment of 45 programs

    Directory of Open Access Journals (Sweden)

    Elize Massard da Fonseca

    2006-04-01

    Full Text Available The present study aims to evaluate the current operation of Brazilian syringe exchange programs (SEP. After consulting national and regional networks of people working in projects/ programs aiming to reduce drug-related harm, we identified 134 potential participant programs. Unfortunately, only 45 SEPs answered a survey, even after repeated attempts. The survey addressed: coverage, funding, procurement of basic supplies, managerial capacity, and the local political environment. Findings were triangulated with in-depth interviews with key informants. The main findings included: satisfactory adherence to the initiatives and adequate documentation, but deficiencies in terms of coverage and monitoring, and uneven procurement of resources. Program personnel work mostly on a provisional basis, despite the efforts of local coordinators. Most programs are funded by the National STDs/AIDS Program. A comprehensive agenda aiming to improve current operations should include: concerted efforts to improve local and regional databanks, incentives/sanctions toward full accountability of initiatives carried by the programs, and a genuine culture of monitoring and evaluation.

  10. Ability-Training-Oriented Automated Assessment in Introductory Programming Course

    Science.gov (United States)

    Wang, Tiantian; Su, Xiaohong; Ma, Peijun; Wang, Yuying; Wang, Kuanquan

    2011-01-01

    Learning to program is a difficult process for novice programmers. AutoLEP, an automated learning and assessment system, was developed by us, to aid novice programmers to obtain programming skills. AutoLEP is ability-training-oriented. It adopts a novel assessment mechanism, which combines static analysis with dynamic testing to analyze student…

  11. Using Corporate-Based Methods To Assess Technical Communication Programs.

    Science.gov (United States)

    Faber, Brenton; Bekins, Linn; Karis, Bill

    2002-01-01

    Investigates methods of program assessment used by corporate learning sites and profiles value added methods as a way to both construct and evaluate academic programs in technical communication. Examines and critiques assessment methods from corporate training environments including methods employed by corporate universities and value added…

  12. 75 FR 30007 - Race to the Top Fund Assessment Program

    Science.gov (United States)

    2010-05-28

    ..., 2010, the Department of Education published in the Federal Register (75 FR 18171) a notice inviting applications for new awards for FY 2010 (NIA) for the Race to the Top Fund Assessment Program. This notice... Overview Information Race to the Top Fund Assessment Program Catalog of Federal Domestic Assistance...

  13. Outcomes Assessment in Accredited Health Information Management Programs

    Science.gov (United States)

    Bennett, Dorine

    2010-01-01

    The purpose of this study was to determine the use and perceived usefulness of outcomes assessment methods in health information management programs. Additional characteristics of the outcomes assessment practices were recognized. The findings were evaluated for significant differences in results based on age of the program, type of institution,…

  14. Meta-Review: Systematic Assessment of Program Review

    Science.gov (United States)

    Harlan, Brian

    2012-01-01

    Over 20 years ago, Robert J. Barak and Barbara E. Breier suggested incorporating a regular assessment of the entire program review system into the review schedule in order to ensure that the system itself is as efficient and effective as the programs under review. Barak and Breier's seminal book on the goals and processes of program review has…

  15. Adaptive Assessment of Student's Knowledge in Programming Courses

    Science.gov (United States)

    Chatzopoulou, D. I.; Economides, A. A.

    2010-01-01

    This paper presents Programming Adaptive Testing (PAT), a Web-based adaptive testing system for assessing students' programming knowledge. PAT was used in two high school programming classes by 73 students. The question bank of PAT is composed of 443 questions. A question is classified in one out of three difficulty levels. In PAT, the levels of…

  16. Generic Assessment Rubrics for Computer Programming Courses

    Science.gov (United States)

    Mustapha, Aida; Samsudin, Noor Azah; Arbaiy, Nurieze; Mohammed, Rozlini; Hamid, Isredza Rahmi

    2016-01-01

    In programming, one problem can usually be solved using different logics and constructs but still producing the same output. Sometimes students get marked down inappropriately if their solutions do not follow the answer scheme. In addition, lab exercises and programming assignments are not necessary graded by the instructors but most of the time…

  17. Bioclim Deliverable D7: continuous climate evolution scenarios over western Europe (1000 km scale)

    International Nuclear Information System (INIS)

    The overall aim of BIOCLIM is to assess the possible long term impacts due to climate change on the safety of radioactive waste repositories in deep formations. This aim is addressed through the following specific objectives: - Development of practical and innovative strategies for representing sequential climatic changes to the geosphere-biosphere system for existing sites over central Europe, addressing the timescale of one million years, which is relevant to the geological disposal of radioactive waste. - Exploration and evaluation of the potential effects of climate change on the nature of the biosphere systems used to assess the environmental impact. - Dissemination of information on the new methodologies and the results obtained from the project among the international waste management community for use in performance assessments of potential or planned radioactive waste repositories. A key point of the project is therefore to develop strategies for representing sequential long-term climatic changes by addressing time scales of relevance to geological disposal of solid radioactive wastes. The integrated strategy, which first step is described in this deliverable (D7), consists of building an integrated, dynamic climate model, to represent all the known important mechanisms for long term climatic variations. The time-dependent results will then be interpreted in terms of regional climate using rule-based and statistical down-scaling approaches. Therefore, the continuous simulation of the climate evolution of the next 200 000 years selected for study is a major objective of the BIOCLIM project. This requires models that account for the simultaneous evolution of the atmosphere, biosphere, land-ice and the ocean. To be able to perform several 200 000-yearlong transient climate simulations, the models have to include all these components, but also need to be simple enough to run fast. Therefore, climate models of intermediate complexity have been chosen to

  18. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  19. ES&H self-assessment and improvement program

    Energy Technology Data Exchange (ETDEWEB)

    Higgins, K.; Campisi, J.; Kelly, B.M.

    1997-06-01

    This document provides an overview of the environment, safety, and health (ES&H) self-assessment and improvement process at Sandia National Laboratories (SNL). It also suggests further developments for self-assessment and improvement. Section 1 explains the many purposes of the self-assessment and improvement program. Section 2 is a description of ES&H self-assessment and improvement and includes information on performance objectives and performance indicators, self-assessment of work areas and activities, reporting of self-assessment results, improvements and corrective actions, and records retention. The sub-section on self-assessment of work areas and activities includes detailed descriptions of organizational self-assessment, ES&H functional program self-assessments, internal independent ES&H assessment, Lockheed Martin Corporate ES&H assessments, and ES&H self-assessment information analysis and integration. Section 3 defines the roles and responsibilities of the ES&H Assessment Department, ES&H Center, SNL management, SNL employees, and contractors, SNL {open_quotes}Line{close_quotes} organizations, and ES&H functional program owners. Section 4 references associated manuals, policies, and companion documents. The appendix is a glossary of terms used in ES&H assessments.

  20. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    OpenAIRE

    Calhoun, Annaliese; Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool ...

  1. Natural Gas Deliverability Task Force report: A joint FERC/DOE project

    International Nuclear Information System (INIS)

    The purpose of the FERC/DOE Natural Gas Deliverability Task Force Report was threefold: (1) to review current deliverability data for utility, accuracy, and timeliness; (2) to identify mechanisms for closing significant gaps in information resulting from changing market structures; and (3) to ensure that technologies are available to meet the needs of the emerging, competitive natural gas industry

  2. 20 CFR 638.812 - State and local taxation of Job Corps deliverers.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State and local taxation of Job Corps deliverers. 638.812 Section 638.812 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... § 638.812 State and local taxation of Job Corps deliverers. The Act provides that transactions...

  3. Fatality Assessment and Control Evaluation (FACE) Program

    Data.gov (United States)

    U.S. Department of Health & Human Services — Each day, between 12 to 13 U.S. workers die as a result of a traumatic injury on the job. Investigations conducted through the FACE program allow the identification...

  4. Web-Based Programs Assess Cognitive Fitness

    Science.gov (United States)

    2009-01-01

    The National Space Biomedical Research Institute, based in Houston and funded by NASA, began funding research for Harvard University researchers to design Palm software to help astronauts monitor and assess their cognitive functioning. The MiniCog Rapid Assessment Battery (MRAB) was licensed by the Criteria Corporation in Los Angeles and adapted for Web-based employment testing. The test battery assesses nine different cognitive functions and can gauge the effect of stress-related deficits, such as fatigue, on various tasks. The MRAB can be used not only for pre-employment testing but also for repeat administrations to measure day-to-day job readiness in professions where alertness is critical.

  5. Project deliverables - a waste of time or a chance for knowledge transfer and dissemination?

    Science.gov (United States)

    Walter, Sylvia

    2016-04-01

    Deliverables are a common tool to measure a distinct output of a project. They should be meaningful in terms of the projec&tacute;s objectives and are normally constituted by e.g. a written report or document, a developed tool or software, an organized training or conference. They can be scientific or technical. The number of deliverables must be reasonable and commensurate to the project and its content. Deliverables as contractual obligations are often time consuming and often seen as a waste of "research" time, as one more administrative task without any use. However, deliverables are needed to verify the progress of a project and to convince the sponsor that the project is going in the right direction and the money well-invested. The presentation will deal with the question on how to use a deliverable in a profitable way for the project and what are the possibilities of use.

  6. Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-06-01

    This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

  7. Physician-assessment and physician-enhancement programs in Canada.

    Science.gov (United States)

    Page, G G; Bates, J; Dyer, S M; Vincent, D R; Bordage, G; Jacques, A; Sindon, A; Kaigas, T; Norman, G R; Kopelow, M; Moran, J

    1996-01-01

    In the mid-1980s, the licensing authorities in Quebec, Ontario and Manitoba have introduced programs to conduct in-depth assessments of the clinical skills and abilities of physicians with suspected deficiencies. These assessments are intended to supplement the provincial licensing authorities' existing peer review or patient-complaint mechanisms by confirming the physicians' overall level of competence and identifying specific clinical strengths and weaknesses. An "educational prescription", based on the results of the assessment, focuses on aspects of clinical practice in which the physicians need or wish to enhance their skills. In some situations, licensure decisions are based on the assessment information. This article describes the programs in Quebec, Ontario and Manitoba. Each program comprises a different process of personal assessment and individualized continuing medical education to help physicians improve their clinical competence, and each is built on sound principles of clinical competence assessment and educational planning. PMID:23511980

  8. Second Line of Defense Spares Program Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

    2012-11-20

    The Office of the Second Line of Defense (SLD) is part of the Department of Energy‘s (DOE) National Nuclear Security Administration (NNSA). The SLD Program accomplishes its critical global security mission by forming cooperative relationships with partner countries to install passive radiation detection systems that augment traditional inspection and law enforcement measures by alerting border officials to the presence of special nuclear or other radiological materials in cross-border traffic. An important tenet of the program is to work collaboratively with these countries to establish the necessary processes, procedures, infrastructure and conditions that will enable them to fully assume the financial and technical responsibilities for operating the equipment. As the number of operational deployments grows, the SLD Program faces an increasingly complex logistics process to promote the timely and efficient supply of spare parts.

  9. Deliverable navigation for multicriteria step and shoot IMRT treatment planning

    Science.gov (United States)

    Craft, David; Richter, Christian

    2013-01-01

    We consider Pareto surface based multi-criteria optimization for step and shoot IMRT planning. By analyzing two navigation algorithms, we show both theoretically and in practice that the number of plans needed to form convex combinations of plans during navigation can be kept small (much less than the theoretical maximum number needed in general, which is equal to the number of objectives for on-surface Pareto navigation). Therefore a workable approach for directly deliverable navigation in this setting is to segment the underlying Pareto surface plans and then enforce the mild restriction that only a small number of these plans are active at any time during plan navigation, thus limiting the total number of segments used in the final plan.

  10. Deliverable navigation for multicriteria step and shoot IMRT treatment planning

    CERN Document Server

    Craft, David

    2012-01-01

    We consider Pareto surface based multi-criteria optimization for step and shoot IMRT planning. By analyzing two navigation algorithms, we show both theoretically and in practice that the number of plans needed to form convex combinations of plans during navigation can be kept small (much less than the theoretical maximum number needed in general, which is equal to the number of objectives for on-surface Pareto navigation). Therefore a workable approach for directly deliverable navigation in this setting is to segment the underlying Pareto surface plans and then enforce the mild restriction that only a small number of these plans are active at any time during plan navigation, thus limiting the total number of segments used in the final plan.

  11. Deliverability on the interstate natural gas pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Deliverability on the Interstate Natural Gas Pipeline System examines the capability of the national pipeline grid to transport natural gas to various US markets. The report quantifies the capacity levels and utilization rates of major interstate pipeline companies in 1996 and the changes since 1990, as well as changes in markets and end-use consumption patterns. It also discusses the effects of proposed capacity expansions on capacity levels. The report consists of five chapters, several appendices, and a glossary. Chapter 1 discusses some of the operational and regulatory features of the US interstate pipeline system and how they affect overall system design, system utilization, and capacity expansions. Chapter 2 looks at how the exploration, development, and production of natural gas within North America is linked to the national pipeline grid. Chapter 3 examines the capability of the interstate natural gas pipeline network to link production areas to market areas, on the basis of capacity and usage levels along 10 corridors. The chapter also examines capacity expansions that have occurred since 1990 along each corridor and the potential impact of proposed new capacity. Chapter 4 discusses the last step in the transportation chain, that is, deliverability to the ultimate end user. Flow patterns into and out of each market region are discussed, as well as the movement of natural gas between States in each region. Chapter 5 examines how shippers reserve interstate pipeline capacity in the current transportation marketplace and how pipeline companies are handling the secondary market for short-term unused capacity. Four appendices provide supporting data and additional detail on the methodology used to estimate capacity. 32 figs., 15 tabs.

  12. Secondary Vocational Horticulture Programs--An Assessment.

    Science.gov (United States)

    Burnett, Michael F.; Smith, Charles W.

    1983-01-01

    The objectives of the study were to determine characteristics of secondary horticulture teachers, the structure of horticulture departments, funding sources, nature and scope of facilities, types of supervised occupational experience programs in which horticulture students participated, and curriculum characteristics of vocational horticulture…

  13. NRC assessment of improvements in licensee procurement and dedication programs

    International Nuclear Information System (INIS)

    The US Nuclear Regulatory Commission (NRC) recently conducted a series of on-site assessments at selected nuclear plants to review improvements that the licenses had made to their procurement and dedication activities. The assessments included an evaluation of the progress made by licensees to strengthen their commercial-grade dedication programs to comply with 10CRF50, Appendix B, and to implement the comprehensive procurement improvements suggested in Nuclear Management and Resource Council (NUMARC) publication 901-3. This paper discusses the overall purpose of the assessments, procurement areas assessed, major strengths and weaknesses identified in licensee procurement programs, and the NRC's perspective of the industry's response to NUMARC procurement initiatives

  14. Test-Retest Reliability of Computerized Concussion Assessment Programs

    OpenAIRE

    Broglio, Steven P.; Ferrara, Michael S.; Macciocchi, Stephen N.; Baumgartner, Ted A; Elliott, Ronald

    2007-01-01

    Context: Computer-based neurocognitive assessment programs commonly are used to assist in concussion diagnosis and management. These tests have been adopted readily by many clinicians based on existing test-retest reliability data provided by test developers.

  15. Environmental Monitoring and Assessment Program (EMAP) National Coastal Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Environmental Monitoring and Assessment Program (EMAP) National Coastal Database contains estuarine and coastal data that EMAP and Regional-EMAP have collected...

  16. Pacific Northwest regional assessment program 1975 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1976-06-01

    The objective of the Pacific Northwest Regional Assessment Program is to establish and exercise an integrated analytical assessment program for evaluation of potential changes that may result from various energy development or conservation scenarios. Such scenarios may themselves result from Federal development policies and programs, from regionally specific actions by the states and energy industries, or from actions taken by international factors currently importing energy resources into the region. After consideration of a variety of approaches to integrated assessment at a regional level, Battelle Pacific Northwest Laboratories (BNW) has concluded that dynamic simulation techniques provide the best available approach to evaluating the issues pertinent to the Northwest. As a result, the Pacific Northwest Regional Assessment Program has been structured in a framework involving ten sectors. Each of these sectors involve their own submodels that receive information either from outside the model as exogenous inputs or from other sector submodels.

  17. Navy radon assessment and mitigation program: Final report

    International Nuclear Information System (INIS)

    This final report encompasses the events from the beginning of the Navy Radon Assessment and Mitigation Program to the closure of the program on October 31, 1994. Included in the report are discussions of the phases of the program including screening, assessment, mitigation, and post-mitigation. The primary discussion involves screening and assessment. The report addresses recommendations made to the Naval Facilities Engineering Command by the Hazardous Waste Remedial Actions Program of Martin Marietta Energy Systems, Inc., and the final decisions that were made. Special emphasis is placed on quality assurance/quality control (QA/QC), since QA/QC was given top priority during the implementation of this program. Included in the discussion on QA/QC are ana overview of the measurement process, positive and negative controls, replicated measurements, and application of chamber exposures to data calibration. The report concludes with a discussion of testing considerations for naval facilities and radon mitigation considerations for the Department of the Navy

  18. Adolescent Perpetrator Treatment Programs: Assessment Issues.

    Science.gov (United States)

    Abbey, Joan M.

    The value of early identification of sexually aberrant behaviors and intervention with sexually deviant minors is obvious from a community safety perspective. Early intervention also appears to have value from the offender's perspective. A research review revealed several common themes with implications for both assessment and treatment. Most…

  19. New Strategy to Monitor and Assess Laboratory Biosafety Programs

    OpenAIRE

    Meeks, Heather N.; Haile, Betiel H.; Erondu, Ngozi A.; Ferland, Lisa; Park, Meeyoung; McNabb, Scott J.

    2013-01-01

    Objective To develop a toolset to monitor and assess laboratory biosafety program performance and cost Introduction Laboratory biosafety – a component of biosecurity – has specific elements that together, comprise a facility’s capability to both protect employees and the surrounding public and environment. Measuring these elements permits assessment and the costing of program-specific safety interventions. In the absence of a strategy and toolset, we developed a conceptual framework and tools...

  20. 78 FR 46905 - Tobacco Transition Program; Final Assessment Procedures

    Science.gov (United States)

    2013-08-02

    ... information about the final quarterly assessments for the Tobacco Transition Program (TTP). Through the Tobacco Transition Payment Program (TTPP), which is part of the TTP, eligible former tobacco quota holders..., 2014. Also, as specified in the TTP regulations, the final two calendar quarterly payments are both...

  1. Environmental Hazards Assessment Program: Quarterly report, October--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report describes activities and reports on progress for the second quarter (October 93 - December 93) of the second year of the grant to support the Environmental Hazards Assessment Program (EHAP). It reports progress against grant objectives and the Program Implementation Plan published at the end of the first year of the grant.

  2. 75 FR 76921 - Tobacco Transition Payment Program; Tobacco Transition Assessments

    Science.gov (United States)

    2010-12-10

    ... Corporation 7 CFR Part 1463 RIN 0560-AH30 Tobacco Transition Payment Program; Tobacco Transition Assessments... Commodity Credit Corporation (CCC) is modifying the regulations for the Tobacco Transition Payment Program (TTPP) to clarify, consistent with current practice and as required by the Fair and Equitable...

  3. Jersey: Financial Sector Assessment Program Update: Financial System Stability Assessment

    OpenAIRE

    International Monetary Fund

    2009-01-01

    This paper examines the Financial System Stability Assessment on Jersey. Most banks in Jersey are branches or subsidiaries of large international groups, to which they provide financing. This close relationship reduces risk in normal times, given the groups’ ability to support their Jersey operations. The Jersey Financial Services Commission has significantly reformed the regulatory framework of funds, mainly to make Jersey funds more attractive to institutional investors. A key challenge i...

  4. Program Educational Objectives Definition and Assessment for Accreditation Purposes

    Directory of Open Access Journals (Sweden)

    Noureddine Abbadeni

    2013-07-01

    Full Text Available Academic accreditation of degree programs is becoming an important mean for many institutions to improve the quality of their degree programs. Many programs, in particular computing and engineering, offered by many schools have engaged in the accreditation process with different accreditation bodies. The most known accreditation body in the Unites States of America for engineering, computing, technology, and applied science programs is ABET (Accreditation Board for Engineering and Technology. A key problem towards the satisfaction of ABET accreditation criteria is the appropriate definition and assessment of program educational objectives for a specific degree program. Program Educational Objectives are important as they represent the ultimate mean to judge the quality of a program. They related directly to student outcomes and curriculum of a degree program. We propose a set of guidelines to help understand how program educational objectives can be defined and assessed. We relate and use examples from our practical experience acquired while working on the ABET accreditation of a Software Engineering program;

  5. School Indoor Air Quality Assessment and Program Implementation.

    Science.gov (United States)

    Prill, R.; Blake, D.; Hales, D.

    This paper describes the effectiveness of a three-step indoor air quality (IAQ) program implemented by 156 schools in the states of Washington and Idaho during the 2000-2001 school year. An experienced IAQ/building science specialist conducted walk-through assessments at each school. These assessments documented deficiencies and served as an…

  6. The Role of Assessment in Federal Education Programs

    Science.gov (United States)

    Popham, W. James

    2008-01-01

    Recognizing the potential of accountability tests to alter classroom instruction, an overview is provided of the federal government's past influence on educational assessments. The past 50 years has witnessed the function of federally engendered educational assessments shift from monitoring the use of federal funds for programs prescribed for…

  7. Fire fighting capability assessment program Darlington NGS

    International Nuclear Information System (INIS)

    This is a report on the completion of work relating to the assessment of the capability of Darlington NGS to cope with a large fire incident. This included an evaluation of an exercise scenario that would simulate a large fire incident and of their fire plans and procedures which became the subject of interim reports as part of the process of preparing for the fire fighting and rescue exercise. Finally the execution of fire plans by Darlington Nuclear Generating Station (NGS), as demonstrated by their application of human and material resources during a simulated large fire, was observed. 1 tab., 1 fig

  8. Assessing functional diversity by program slicing

    International Nuclear Information System (INIS)

    A responsibility of the Nuclear Regulatory Commission auditors is to provide assessments of the quality of the safety systems. For software, the audit process as currently implemented is a slow, tedious, manual process prone to human errors. While auditors cannot possibly examine all components of the system in complete detail, they do check for implementation of specific principles like functional diversity. This paper describes an experimental prototype Computer Aided Software Engineering (CASE) tool, UNRAVEL, designed to enable auditors to check for functional diversity and aid an auditor in examining software by extracting all code relevant to a computation identified for detailed inspection

  9. Development of a vulnerability assessment program for domestic use

    International Nuclear Information System (INIS)

    The Physical Protection System (PPS) design process includes the vulnerability assessment phase to validate the performance of the designed PPS. The direct evaluation of a PPS consisting of a lot of detection, delay and response elements, requires a large amount of resources (time, manpower, cost, and so on) thus it is an impractical approach in most cases. However, an appropriately developed vulnerability assessment program demands less resources for the PPS design evaluation and provides useful information on PPS improvement. This paper describes the functional requirements, technical considerations, development plan, and conceptual design of a vulnerability assessment program for Korean PPSs

  10. Pspace: a program that assesses protein space

    Directory of Open Access Journals (Sweden)

    Zhou Ming-Ming

    2007-10-01

    Full Text Available Abstract Background We describe a computer program named Pspace designed to a obtain a reliable basis for the description of three-dimensional structures of a given protein family using homology modeling through selection of an optimal subset of the protein family whose structure would be determined experimentally; and b aid in the search of orthologs by matching two sets of sequences in three different ways. Methods The prioritization is established dynamically as new sequences and new structures are becoming available through ranking proteins by their value in providing structural information about the rest of the family set. The matching can give a list of potential orthologs or it can deduce an overall optimal matching of two sets of sequences. Results The various covering strategies and ortholog searches are tested on the bromodomain family. Conclusion The possibility of extending this approach to the space of all proteins is discussed.

  11. Analysis within the systems development life-cycle data analysis, the deliverables

    CERN Document Server

    Rock-Evans, Rosemary

    1987-01-01

    Analysis within the Systems Development Life-Cycle: Book 1, Data Analysis-The Deliverables provides a comprehensive treatment of data analysis within the systems development life-cycle and all the deliverables that need to be collected in analysis. The purpose of deliverables is explained and a number of alternative ways of collecting them are discussed. This book is comprised of five chapters and begins with an overview of what """"analysis"""" actually means, with particular reference to tasks such as hardware planning and software evaluation and where they fit into the overall cycle. The ne

  12. [Hemophilia patient education: teaching and assessment of 10 programs].

    Science.gov (United States)

    Ané, Anne-Marie; Wintz, Lydie; Sannié, Thomas; Gagnayre, Rémi

    2011-01-01

    A group of health professionals and patients conducted a pedagogical assessment of Therapeutic Patient Education (TPE) in haemophilia in France, focused on 2 main subjects: "the objectives and aims of TPE programs" and "the health professionals' ability to lead and contribute to TPE programs" (3). The use of a research laboratory and a participatory methodology allowed for identifying the assessment's challenges and contributed to its smooth running. TPE is starting to be integrated with medical care for patients, and a multidisciplinary approach better meets patients' educational needs. Two prerequisites for improving the pedagogical quality of these programs are self-reported patient needs and coordination of the TPE activities. The parties involved in this study are now better prepared to meet the ARS (4) TPE program specifications in haemophilia, and, importantly, are better prepared to undergo the assessment that takes place every 4 years. PMID:21896226

  13. Assessment of light water reactor accident management programs and experience

    International Nuclear Information System (INIS)

    The objective of this report is to provide an assessment of the current light water reactor experience regarding accident management programs and associated technology developments. This assessment for light water reactor (LWR) designs is provided as a resource and reference for the development of accident management capabilities for the production reactors at the Savannah River Site. The specific objectives of this assessment are as follows: 1. Perform a review of the NRC, utility, and industry (NUMARC, EPRI) accident management programs and implementation experience. 2. Provide an assessment of the problems and opportunities in developing an accident management program in conjunction or following the Individual Plant Examination process. 3. Review current NRC, utility, and industry technological developments in the areas of computational tools, severe accident predictive tools, diagnostic aids, and severe accident training and simulation

  14. Assessment of light water reactor accident management programs and experience

    Energy Technology Data Exchange (ETDEWEB)

    Hammersley, R.J. [Fauske and Associates, Inc., Burr Ridge, IL (United States)

    1992-03-01

    The objective of this report is to provide an assessment of the current light water reactor experience regarding accident management programs and associated technology developments. This assessment for light water reactor (LWR) designs is provided as a resource and reference for the development of accident management capabilities for the production reactors at the Savannah River Site. The specific objectives of this assessment are as follows: 1. Perform a review of the NRC, utility, and industry (NUMARC, EPRI) accident management programs and implementation experience. 2. Provide an assessment of the problems and opportunities in developing an accident management program in conjunction or following the Individual Plant Examination process. 3. Review current NRC, utility, and industry technological developments in the areas of computational tools, severe accident predictive tools, diagnostic aids, and severe accident training and simulation.

  15. 78 FR 32381 - Applications for New Awards; Enhanced Assessment Instruments Grants Program-Enhanced Assessment...

    Science.gov (United States)

    2013-05-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Applications for New Awards; Enhanced Assessment Instruments Grants Program--Enhanced Assessment Instruments--Kindergarten Entry Assessment Competition Correction In notice document 2013-12212 appearing on pages...

  16. Patents Assessed through Sectoral Operational Programs

    Directory of Open Access Journals (Sweden)

    Paula – Angela VIDRAȘCU

    2014-06-01

    Full Text Available According to the International Accounting Standards – IAS 38 „Intangible assets”; these assets are identifiable non-monetary assets under construction were considered without physical substance. Lack actual physical form must not be understood that an intangible asset would have no material support, because the presence of any intangible asset can be demonstrated only by a support material form. Exmple: frequently encounter compact-disc (in case a software, legal documentation (in the case of licences, trade marks and patents of invention, contracts, permits and licences, technical documentation or films. Nowadays we are constantly subjected to the changing flow of information that is found in a perpetual technological change which started the emergence of a new stage in the society development that which carries the name of knowledge. The object of my research is the patent for the structural funds reimbursable project submitted in the "Operational Program, Economic Competitiveness" Operation 2.3.1. "Support for start-ups and innovative spin-offs. Patent is an official document certifying the inventor, the exclusive right to produce a certain good or product or use a particular process. Remember that evaluation of intangible assets is the most complex and systematic procedure.

  17. Environmental Assessment : Squawfish Management Program : Final.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  18. Chemical Stockpile Disposal Program rapid accident assessment

    Energy Technology Data Exchange (ETDEWEB)

    Chester, C.V.

    1990-08-01

    This report develops a scheme for the rapid assessment of a release of toxic chemicals resulting from an accident in one of the most chemical weapon demilitarization plants or storage areas. The system uses such inputs as chemical and pressure sensors monitoring the plant and reports of accidents radioed to the Emergency Operations Center by work parties or monitoring personnel. A size of release can be estimated from previous calculations done in the risk analysis, from back calculation from an open-air chemical sensor measurement, or from an estimated percentage of the inventory of agent at the location of the release. Potential consequences of the estimated release are calculated from real-time meteorological data, surrounding population data, and properties of the agent. In addition to the estimated casualties, area coverage and no-death contours vs time would be calculated. Accidents are assigned to one of four categories: community emergencies, which are involve a threat to off-site personnel; on-post emergencies, which involve a threat only to on-site personnel; advisory, which involves a potential for threat to on-site personnel; and chemical occurrence, which can produce an abnormal operating condition for the plant but no immediate threat to on-site personnel. 9 refs., 20 tabs.

  19. International Code Assessment and Applications Program: Annual report

    International Nuclear Information System (INIS)

    This is the first annual report of the International Code Assessment and Applications Program (ICAP). The ICAP was organized by the Office of Nuclear Regulatory Research, United States Nuclear Regulatory Commission (USNRC) in 1985. The ICAP is an international cooperative reactor safety research program planned to continue over a period of approximately five years. To date, eleven European and Asian countries/organizations have joined the program through bilateral agreements with the USNRC. Seven proposed agreements are currently under negotiation. The primary mission of the ICAP is to provide independent assessment of the three major advanced computer codes (RELAP5, TRAC-PWR, and TRAC-BWR) developed by the USNRC. However, program activities can be expected to enhance the assessment process throughout member countries. The codes were developed to calculate the reactor plant response to transients and loss-of-coolant accidents. Accurate prediction of normal and abnormal plant response using the codes enhances procedures and regulations used for the safe operation of the plant and also provides technical basis for assessing the safety margin of future reactor plant designs. The ICAP is providing required assessment data that will contribute to quantification of the code uncertainty for each code. The first annual report is devoted to coverage of program activities and accomplishments during the period between April 1985 and March 1987

  20. Performance assessment implementation plan for the geologic repository program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-01-01

    Performance assessment is a major constituent of the program being conducted in the Civilian Radioactive Waste Management (CRWM) Program of the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations of repository-system performance to access compliance with regulations and to support the development of the geologic repository. To define the strategy for these evaluations, the DOE has developed this performance assessment strategy plan. This document discusses the need for such a strategy, the objectives and scope of the strategy plan, the relationship of the plan to other program plans. Additionally, it defines performance assessment and describes the roles of performance assessment in this program, discusses concepts and general strategies needed for performance assessment, outlines the content of the Safety Analysis Report, summarizes the requirements for the repository Environmental Impact Statement, discusses the requirements that apply to the site-suitability analyses and describes the site characterization. 10 figs., 7 tabs.

  1. Performance assessment implementation plan for the geologic repository program

    International Nuclear Information System (INIS)

    Performance assessment is a major constituent of the program being conducted in the Civilian Radioactive Waste Management (CRWM) Program of the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations of repository-system performance to access compliance with regulations and to support the development of the geologic repository. To define the strategy for these evaluations, the DOE has developed this performance assessment strategy plan. This document discusses the need for such a strategy, the objectives and scope of the strategy plan, the relationship of the plan to other program plans. Additionally, it defines performance assessment and describes the roles of performance assessment in this program, discusses concepts and general strategies needed for performance assessment, outlines the content of the Safety Analysis Report, summarizes the requirements for the repository Environmental Impact Statement, discusses the requirements that apply to the site-suitability analyses and describes the site characterization. 10 figs., 7 tabs

  2. Management assessments of Quality Assurance Program implementation effectiveness

    International Nuclear Information System (INIS)

    This paper describes a method currently being used by UNC Nuclear Industries, Richland, Washington, to help assure the effectiveness of Quality Assurance (QA) Program implementation. Assessments are conducted annually by management in each department, and the results summarized to the president and his staff. The purpose of these assessments is to review the adequacy of the department's implementing procedures, training/instruction on implementing procedures, and procedure implementation effectiveness. The primary purpose is to assess effectiveness and take improvement action where the need is indicated. The QA organization provides only general guidance in conducting the assessments

  3. Inventors Center of Michigan Technical Assessment Program. Final progress report

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    The Technical Assessment Program at the Inventors Center of Michigan is designed to provide independent inventors with a reliable assessment of the technical merits of their proposed inventions. Using faculty from within Ferris State University`s College of Technology an assessment process examines the inventor`s assumptions, documentation, and prototypes, as well as, reviewing patent search results and technical literature to provide the inventor with a written report on the technical aspects of the proposed invention. The forms for applying for a technical assessment of an invention are included.

  4. Virtual Enterprise Reference Architecture and Methodology (VERAM), Joint D41/D43 deliverable of GLOBEMEN

    DEFF Research Database (Denmark)

    Tølle, Martin; Zwegers, Arian; Vesterager, Johan

    2003-01-01

    This document, D412/D43 Virtual Enterprise Reference Architecture and Methodology (VERAM), is a result of the merging of the two main deliverables of work package 4 of the IMS GLOBEMEN project: D41 Reference Architecture (deliverable D412 for the European GLOBEMEN project) and D43 VME Guidelines....... IMS Globemen is an inter-regional project aiming to develop methods, tools and architectures to support inter-enterprise operations in one-of-kind industries, in different lifecycle phases. This deliverable describes an architectural framework VERAM including a description/elaboration of its elements....... The emphasis in this deliverable is to define an architectural framework, which will be a body of knowledge that supports future practical work in the area of global engineering and manufacturing in enterprise networks, supported by methodologies/guidelines. This document is organised as follows: - A...

  5. Environmental Hazards Assessment Program annual report, [June 1992--June 1993

    International Nuclear Information System (INIS)

    This report, the Environment Hazards Assessment Program (EHAP) Annual Report, is the second of three reports that document activities under the EHAP grant and details progress made during the first year of the grant. The first year was devoted to the development of a working program implementation plan. During the developmental process some key objectives were achieved such as developing a Doctor of Philosophy degree program in Environmental Studies at MUSC (Medical University of South Carolina) and conducting the first Crossroads of Humanity series Round Table Forum. The PIP (Program Implementation Program) details the objectives, management and budgetary basis for the overall management and control of the grant over the next four years, the yearly program plans provide the monthly and day-to-day programmatic and budgetary control by which the PIP was developed

  6. Environmental Hazards Assessment Program annual report, [June 1992--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This report, the Environment Hazards Assessment Program (EHAP) Annual Report, is the second of three reports that document activities under the EHAP grant and details progress made during the first year of the grant. The first year was devoted to the development of a working program implementation plan. During the developmental process some key objectives were achieved such as developing a Doctor of Philosophy degree program in Environmental Studies at MUSC (Medical University of South Carolina) and conducting the first Crossroads of Humanity series Round Table Forum. The PIP (Program Implementation Program) details the objectives, management and budgetary basis for the overall management and control of the grant over the next four years, the yearly program plans provide the monthly and day-to-day programmatic and budgetary control by which the PIP was developed.

  7. QUEST2: Release 1, SA/Release 1 supporting documents deliverable set

    Energy Technology Data Exchange (ETDEWEB)

    Braaten, F.D.

    1995-02-27

    This document contains deliverables which reflect the last of the System Architecture phase analysis for the Quality, Environmental, Safety Tracking System redesign (QUEST2) project. These deliverables are focused on the final insights required to start functional design of the first QUEST2 release. They include the data definitions, conversion rules, standards for design and user interface, performance criteria, and rules to be followed during the prototyping activity described in the Project Management Plan.

  8. IKS Deliverable - D1.1 Report: Design of the Semantic Benchmark Experiment

    OpenAIRE

    Kowatsch, Tobias; Maass, Wolfgang; Damjanovic, Violeta; Behrendt, Wernher; Gruber, Andreas; Nagel, Benjamin; Sauer, Stefan; Engels, Gregor

    2009-01-01

    Public Deliverable - The objective of this deliverable is to design a benchmark model for Content Management Systems (CMSs) in order to identify relevant requirements for the Interactive Knowledge Stack (IKS). The IKS will be a layered set of software components and specifications with the goal to improve the interaction with knowledge objects of CMSs by using Semantic Web technologies. In contrast to projects that benchmarked rather technical aspects of CMSs, we propose a model that evaluate...

  9. Security Measures in Automated Assessment System for Programming Courses

    Directory of Open Access Journals (Sweden)

    Jana Šťastná

    2015-12-01

    Full Text Available A desirable characteristic of programming code assessment is to provide the learner the most appropriate information regarding the code functionality as well as a chance to improve. This can be hardly achieved in case the number of learners is high (500 or more. In this paper we address the problem of risky code testing and availability of an assessment platform Arena, dealing with potential security risks when providing an automated assessment for a large set of source code. Looking at students’ programs as if they were potentially malicious inspired us to investigate separated execution environments, used by security experts for secure software analysis. The results also show that availability issues of our assessment platform can be conveniently resolved with task queues. A special attention is paid to Docker, a virtual container ensuring no risky code can affect the assessment system security. The assessment platform Arena enables to regularly, effectively and securely assess students' source code in various programming courses. In addition to that it is a motivating factor and helps students to engage in the educational process.

  10. Continuing medical education, needs assessment, and program development: theoretical constructs.

    Science.gov (United States)

    Aherne, M; Lamble, W; Davis, P

    2001-01-01

    Continuing medical education (CME) program development and needs assessment have historically been practiced within the tradition of Ralph Tyler's education model. In light of transformational social, political, economic, and technical forces that demand greater account-ability and responsiveness from physicians, CME units are challenged to transform their cultures and structures from models that deliver education to models that support the facilitation of learning for enhanced competence and performance. This article describes key change forces for physicians and brings program development and needs assessment into focus for the discussion. The impact of change forces on program development and needs assessment are examined, and some techniques to move beyond the traditional approach of felt needs are presented as a way of enabling strategic administrative planning and change management. PMID:11291588

  11. [Environmental Hazards Assessment Program annual report, June 1992--June 1993

    International Nuclear Information System (INIS)

    The Medical University of South Carolina (MUSC) and the University of Charleston, South Carolina (UCSC) propose to offer the degree of Master of Science in Environmental Studies. The proposed starting date is August 1994. The purpose of this interdisciplinary program is to offer nationally and internationally recognized graduate level training in the areas of environmental policy, science, and health risk assessment. Special emphasis will be placed on human health. Included in this proposal are a needs assessment for environmental science professionals along with employment projections and salary expectations. The Environmental Science program is described and its relationship to other programs within MUSC and UCSC, as well as its relation to similar programs at other institutions are examined. Enrollment is discussed, admission requirements and standards outlined, and the curriculum is described. Academic and physical resources are examined and estimated costs are given

  12. Assessing Extension Program Impact: Case Study of a Water Quality Program.

    Science.gov (United States)

    Bauder, J. W.

    1993-01-01

    Montana State University conducted a voluntary, private well water test program (n=3400) to direct public attention to water quality education. Eighty-four percent of the respondents to an impact assessment questionnaire indicated that the program was moderately to very effective. Other results involved user awareness and understanding, and…

  13. Using Organizational Assessment as a Tool for Program Change

    OpenAIRE

    Courtney, Katherine Ortega; Joe, George W.; Rowan-Szal, Grace A.; Simpson, D. Dwayne

    2007-01-01

    Organizational functioning within substance abuse treatment organizations is important to the transfer of research innovations into practice. Programs should be performing well for new interventions to be implemented successfully. The present study examined characteristics of treatment programs that participated in an assessment and training workshop designed to improve organizational functioning. The workshop was attended by directors and clinical supervisors from 53 community-based treatmen...

  14. Financial Education Programs in Colombia: Challenges in Assessing their Effectiveness

    OpenAIRE

    Álvarez-Franco, Pilar B.; Muñoz-Murillo, Melisa; Restrepo-Tobón, Diego A.

    2015-01-01

    Financial education programs enjoy widespread governmental and financial industry support. They are considered an important tool for improving financial literacy, encouraging financial inclusion, and increasing consumer financial protection. Therefore, assessing their effectiveness is important to guarantee that public and private resources are allocated wisely. As we highlight in this paper, the available empirical literature casts serious doubts on the effectiveness of those programs in ach...

  15. 76 FR 34124 - RTCA Program Management Committee

    Science.gov (United States)

    2011-06-10

    ... Meeting Management. Other Business. Schedule for Committee Deliverables and Next Meeting Date. Adjourn... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is...

  16. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    International Nuclear Information System (INIS)

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges

  17. Formerly Utilized Sites Remedial Action Program environmental compliance assessment checklists

    Energy Technology Data Exchange (ETDEWEB)

    Levine, M.B.; Sigmon, C.F.

    1989-09-29

    The purpose of the Environmental Compliance Assessment Program is to assess the compliance of Formerly Utilized Site Remedial Action Program (FUSRAP) sites with applicable environmental regulations and Department of Energy (DOE) Orders. The mission is to identify, assess, and decontaminate sites utilized during the 1940s, 1950s, and 1960s to process and store uranium and thorium ores in support of the Manhattan Engineer District and the Atomic Energy Commission. To conduct the FUSRAP environmental compliance assessment, checklists were developed that outline audit procedures to determine the compliance status of the site. The checklists are divided in four groups to correspond to these regulatory areas: Hazardous Waste Management, PCB Management, Air Emissions, and Water Discharges.

  18. Physician-assessment and physician-enhancement programs in Canada.

    OpenAIRE

    Page, G.G; Bates, J.; Dyer, S M; Vincent, D R; Bordage, G; Jacques, A.; Sindon, A.; Kaigas, T; Norman, G R; Kopelow, M

    1995-01-01

    Since the mid-1980s, the licensing authorities in Quebec, Ontario and Manitoba have introduced programs to conduct in-depth assessments of the clinical skills and abilities of physicians with suspected deficiencies. These assessments are intended to supplement the provincial licensing authorities' existing peer review or patient-complaint mechanisms by confirming the physicians' overall level of competence and identifying specific clinical strengths and weaknesses. An "educational prescriptio...

  19. Adaptive Model for Computer-Assisted Assessment in Programming Skills

    OpenAIRE

    Molins-Ruano, P.; González-Sacristán, C.; F. Díez; Rodriguez, P.; Sacha, G. M.

    2014-01-01

    In this work, we show a methodology aimed to improve the quality of the assessment process for subjects related to basic programming. The method takes into account the relevance of the items and the students answers to follow different paths to improve the accuracy of the assessment process. We have developed numerical simulations and experiments with real students that demonstrate the advantages of this model when compared with traditional evaluation tools. This method improves the objective...

  20. Assessment of specialized educational programs for licensed nuclear reactor operators

    International Nuclear Information System (INIS)

    This report assesses the job-relatedness of specialized educational programs for licensed nuclear reactor operators. The approach used involved systematically comparing the curriculum of specialized educational programs for college credit, to academic knowledge identified as necessary for carrying out the jobs of licenses reactor operators. A sample of eight programs, including A.S. degree, B.S. degree, and coursework programs were studied. Subject matter experts in the field of nuclear operations curriculum and training determined the extent to which individual program curricula covered the identified job-related academic knowledge. The major conclusions of the report are: There is a great deal of variation among individual programs, ranging from coverage of 15% to 65% of the job-related academic knowledge. Four schools cover at least half, and four schools cover less than one-third of this knowledge content; There is no systematic difference in the job-relatedness of the different types of specialized educational programs, A.S. degree, B.S. degree, and coursework; and Traditional B.S. degree programs in nuclear engineering cover as much job-related knowledge (about one-half of this knowledge content) as most of the specialized educational programs

  1. Landscape-scale learning: from lectures to professional deliverables

    Science.gov (United States)

    Follain, S.; Devaux, N.; Colin, F.

    2009-04-01

    Earth Science ingenieers (Master degree) need to be trained in multidisciplinary approaches but also to learn how to combine theoretical and practical knowledge. Nevertheless we notice it is not always easy to combine in a same lecture, theoretical and practical issues. In order to build bridges between these instructions we propose to student a new teaching unit: "Sustainability Diagnosis". Its originalities are i) to be couple to an other (theoretical) teaching unit dealing with landscape-scale learning ii) to be performed under a project mode and iii) to provide deliverables ordered by professional users, e.g. farmers, catchment managers. The landscape-scale learning is a classical learning period with lectures provided by specialists in various disciplines e.g. Soil Science, Hydrology, Agronomy, which focus on a common spatial scale, the landscape. It explicitly develops knowledge on energy and matter transfers between landscape components and explains potential effects of human-induced disturbances on both landscape and fluxes evolution. The deliverables for the farmer (chosen professional user) concern issues on his crop system sustainability. It requires a diagnosis in one hand on soil use and management potentialities and in another hand on environmental externalities (soil and water conservation) induced by the cropping system. The communication will present the work done by 14 students during this new teaching unit (Sustainability Diagnosis) of two weeks. This first attempt expertized a one square kilometer area located in Saint-Chinian vineyard region (South of France). This production area with guarantee of origin (AOC) has productivity constraints linked to landscape properties which directly impact farmer decisions. In the same time it has been shown that vineyard crop system induces water pollution by pesticides and increases soil degradation; in a sustainability perspective, these environmental impacts need to be reduced. The learning period was

  2. FY11 Facility Assessment Study for Aeronautics Test Program

    Science.gov (United States)

    Loboda, John A.; Sydnor, George H.

    2013-01-01

    This paper presents the approach and results for the Aeronautics Test Program (ATP) FY11 Facility Assessment Project. ATP commissioned assessments in FY07 and FY11 to aid in the understanding of the current condition and reliability of its facilities and their ability to meet current and future (five year horizon) test requirements. The principle output of the assessment was a database of facility unique, prioritized investments projects with budgetary cost estimates. This database was also used to identify trends for the condition of facility systems.

  3. National Weatherization Assistance Program Evaluation: Assessment of Refrigerator Energy Use

    Energy Technology Data Exchange (ETDEWEB)

    Tonn, Bruce Edward [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Goeltz, Rick [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-03-01

    This report assesses the energy consumption characteristics and performance of refrigerators that were monintored as a component of the Indoor Air Quality Study that itself was a component of the retrospective evaluation of the Department of Energy's Weatherization Assistance Program.

  4. Computer aided assessments and programming exercises with JACK

    OpenAIRE

    Goedicke, Michael; Striewe, Michael; Balz, Moritz

    2008-01-01

    In this report a system for computer aided assessments and exercises on Java programming is presented and discussed. The report includes a detailed system description, experiences and evaluations from using the system, plans for future development and a brief overview about related work and discussions.

  5. Counselor Competence, Performance Assessment, and Program Evaluation: Using Psychometric Instruments

    Science.gov (United States)

    Tate, Kevin A.; Bloom, Margaret L.; Tassara, Marcel H.; Caperton, William

    2014-01-01

    Psychometric instruments have been underutilized by counselor educators in performance assessment and program evaluation efforts. As such, we conducted a review of the literature that revealed 41 instruments fit for such efforts. We described and critiqued these instruments along four dimensions--"Target Domain," "Format,"…

  6. Environmental Hazards Assessment Program. Quarterly report, July 1994--September 1994

    International Nuclear Information System (INIS)

    The objectives of the Environmental Hazards Assessment Program (EHAP) stated in the proposal to DOE are as follows: Development of a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; development of a pool of talented scientist and experts in cleanup activities, especially in human health aspects; identification of needs and development of programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This is a progress report of the first quarter of the third year of the grant. It reports progress against these grant objectives and the Program Implementation Plan (published at the end of the first year of the grant)

  7. Environmental Hazards Assessment Program. Quarterly report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-31

    This report describes activities and reports on progress for the first quarter (July--September) of the fourth year of the grant to support the Environmental Hazards Assessment Program (EHAP) at the Medical University of South Carolina. It reports progress against the grant objectives and the Program Implementation Plan published at the end of the first year of the grant. The objectives of EHAP stated in the proposal to DOE are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health-oriented aspects of environmental restoration and waste management.

  8. Program for rapid dose assessment in criticality accident, RADAPAS

    International Nuclear Information System (INIS)

    In a criticality accident, a person near fissile material can receive extremely high dose which can cause acute health effect. For such a case, medical treatment should be carried out for the exposed person, according to severity of the exposure. Then, radiation dose should be rapidly assessed soon after an outbreak of an accident. Dose assessment based upon the quantity of induced 24Na in human body through neutron exposure is expected as one of useful dosimetry techniques in a criticality accident. A dose assessment program, called RADAPAS (RApid Dose Assessment Program from Activated Sodium in Criticality Accidents), was therefore developed to assess rapidly radiation dose to exposed persons from activity of induced 24Na. RADAPAS consists of two parts; one is a database part and the other is a part for execution of dose calculation. The database contains data compendiums of energy spectra and dose conversion coefficients from specific activity of 24Na induced in human body, which had been derived in a previous analysis using Monte Carlo calculation code. Information for criticality configuration or characteristics of radiation in the accident field is to be interactively given with interface displays in the dose calculation. RADAPAS can rapidly derive radiation dose to the exposed person from the given information and measured 24Na specific activity by using the conversion coefficient in database. This report describes data for dose conversions and dose calculation in RADAPAS and explains how to use the program. (author)

  9. PARENT Program for DMW(Dissimilar Metal Weld) Reliability Assessment

    International Nuclear Information System (INIS)

    Some cracks were found in dissimilar metal welds (DMW), which are connected with major components of nuclear power plants. Usually, the dissimilar metal welds are consisted of Alloy 600, carbon steel and stainless steel. Since 2000s, most of the cracks are found in welds, especially dissimilar metal welds such as pressurizer safety relief nozzle, reactor head penetration, reactor bottom mounted instrumentation (BMI), and reactor nozzles. Since the cracks are revealed as a primary water stress corrosion cracking (PWSCC), the reliability of non destructive evaluation (NDE) technique becomes more important. To cope with the NDE reliability, PINC (program for inspection of nickel alloy components) international cooperation was organized. The aim of the project was 1) to fabricate representative NDE mock-ups with flaws to simulate PWSCCs, 2) to identify and quantitatively assess NDE methods for accurately detecting, sizing and characterizing PWSCCs, 3) to document the range of locations and morphologies of PWSCCs and 4) to incorporate results with other results of ongoing PWSCC research programs, as appropriate. Since the last KNS autumn meeting, the PINC program was finalized and the next program PARENT (Program to Assess Reliability for Emerging NDE Technique) is started on June this year. In this study, as part of the PINC project, international RRT (round robin test) results for DMW will be introduced and the status of new PARENT program will be introduced

  10. Assessment Tool Development for Extracurricular Smet Programs for Girls

    Science.gov (United States)

    House, Jody; Johnson, Molly; Borthwick, Geoffrey

    Many different programs have been designed to increase girls' interest in and exposure to science, mathematics, engineering, and technology (SMET). Two of these programs are discussed and contrasted in the dimensions of length, level of science content, pedagogical approach, degree of self- vs. parent-selected participants, and amount of communitybuilding content. Two different evaluation tools were used. For one program, a modified version of the University of Pittsburgh's undergraduate engineering attitude assessment survey was used. Program participants' responses were compared to those from a fifth grade, mixed-sex science class. The only gender difference found was in the area of parental encouragement. The girls in the special class were more encouraged to participate in SMET areas. For the second program, a new age-appropriate tool developed specifically for these types of programs was used, and the tool itself was evaluated. The results indicate that the new tool has construct validity. On the basis of these preliminary results, a long-term plan for the continued development of the assessment tool is outlined.

  11. The value of assessments in Lawrence Livermore National Laboratory's Waste Certification Programs

    International Nuclear Information System (INIS)

    This paper will discuss the value of assessments in Lawrence Livermore National Laboratory's Waste Certification Programs by: introducing the organization and purpose of the LLNL Waste Certification Programs for transuranic, low-level, and hazardous waste; examining the differences in internal assessment/audit requirements for these programs; discussing the values and costs of assessments in a waste certification program; presenting practical recommendations to maximize the value of your assessment programs; and presenting improvements in LLNL's waste certification processes that resulted from assessments

  12. Environmental Hazards Assessment Program. Quarterly report, July--September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    The objectives of the EHAP program stated in the proposal to DOE are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication which recognizes the direct impact of environmental hazards on the health and well-being of all, (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management.

  13. Deliverable navigation for multicriteria IMRT treatment planning by combining shared and individual apertures

    International Nuclear Information System (INIS)

    We consider the problem of deliverable Pareto surface navigation for step-and-shoot intensity-modulated radiation therapy. This problem amounts to calculation of a collection of treatment plans with the property that convex combinations of plans are directly deliverable. Previous methods for deliverable navigation impose restrictions on the number of apertures of the individual plans, or require that all treatment plans have identical apertures. We introduce simultaneous direct step-and-shoot optimization of multiple plans subject to constraints that some of the apertures must be identical across all plans. This method generalizes previous methods for deliverable navigation to allow for treatment plans with some apertures from a collective pool and some apertures that are individual. The method can also be used as a post-processing step to previous methods for deliverable navigation in order to improve upon their plans. By applying the method to subsets of plans in the collection representing the Pareto set, we show how it can enable convergence toward the unrestricted (non-navigable) Pareto set where all apertures are individual. (paper)

  14. Deliverable navigation for multicriteria IMRT treatment planning by combining shared and individual apertures

    Science.gov (United States)

    Fredriksson, Albin; Bokrantz, Rasmus

    2013-11-01

    We consider the problem of deliverable Pareto surface navigation for step-and-shoot intensity-modulated radiation therapy. This problem amounts to calculation of a collection of treatment plans with the property that convex combinations of plans are directly deliverable. Previous methods for deliverable navigation impose restrictions on the number of apertures of the individual plans, or require that all treatment plans have identical apertures. We introduce simultaneous direct step-and-shoot optimization of multiple plans subject to constraints that some of the apertures must be identical across all plans. This method generalizes previous methods for deliverable navigation to allow for treatment plans with some apertures from a collective pool and some apertures that are individual. The method can also be used as a post-processing step to previous methods for deliverable navigation in order to improve upon their plans. By applying the method to subsets of plans in the collection representing the Pareto set, we show how it can enable convergence toward the unrestricted (non-navigable) Pareto set where all apertures are individual.

  15. Landscape-scale learning: from lectures to professional deliverables

    Science.gov (United States)

    Follain, S.; Devaux, N.; Colin, F.

    2009-04-01

    Earth Science ingenieers (Master degree) need to be trained in multidisciplinary approaches but also to learn how to combine theoretical and practical knowledge. Nevertheless we notice it is not always easy to combine in a same lecture, theoretical and practical issues. In order to build bridges between these instructions we propose to student a new teaching unit: "Sustainability Diagnosis". Its originalities are i) to be couple to an other (theoretical) teaching unit dealing with landscape-scale learning ii) to be performed under a project mode and iii) to provide deliverables ordered by professional users, e.g. farmers, catchment managers. The landscape-scale learning is a classical learning period with lectures provided by specialists in various disciplines e.g. Soil Science, Hydrology, Agronomy, which focus on a common spatial scale, the landscape. It explicitly develops knowledge on energy and matter transfers between landscape components and explains potential effects of human-induced disturbances on both landscape and fluxes evolution. The deliverables for the farmer (chosen professional user) concern issues on his crop system sustainability. It requires a diagnosis in one hand on soil use and management potentialities and in another hand on environmental externalities (soil and water conservation) induced by the cropping system. The communication will present the work done by 14 students during this new teaching unit (Sustainability Diagnosis) of two weeks. This first attempt expertized a one square kilometer area located in Saint-Chinian vineyard region (South of France). This production area with guarantee of origin (AOC) has productivity constraints linked to landscape properties which directly impact farmer decisions. In the same time it has been shown that vineyard crop system induces water pollution by pesticides and increases soil degradation; in a sustainability perspective, these environmental impacts need to be reduced. The learning period was

  16. Program Assessment Framework for a Rural Palliative Supportive Service

    OpenAIRE

    Barbara Pesut; Brenda Hooper; Richard Sawatzky; Robinson, Carole A; Bottorff, Joan L.; Miranda Dalhuisen

    2013-01-01

    Although there are a number of quality frameworks available for evaluating palliative services, it is necessary to adapt these frameworks to models of care designed for the rural context. The purpose of this paper was to describe the development of a program assessment framework for evaluating a rural palliative supportive service as part of a community-based research project designed to enhance the quality of care for patients and families living with life-limiting chronic illness. A review ...

  17. Development of an integrated probabilistic safety assessment program

    International Nuclear Information System (INIS)

    An integrated Probabilistic Safety Assessment (PSA) program named RiskA has been developed, which can be applied to Fault Tree Analysis, Event Tree Analysis, Uncertainty analysis, Sensitivity Analysis, Importance Analysis, Reliability Data Analysis and Management. An overview of the architecture and functions of RiskA is presented in this paper, as well as the testing and application. The algorithms for Fault Tree Analysis, Event Tree Analysis and Uncertainty Analysis are also presented. (authors)

  18. Risk assessment in the DOE Assurance Program for Remedial Action

    International Nuclear Information System (INIS)

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly

  19. Risk assessment in the DOE Assurance Program for Remedial Action

    Energy Technology Data Exchange (ETDEWEB)

    Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

    1985-08-01

    This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly.

  20. Environmental Hazards Assessment Program. Quarterly report, April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-31

    The objectives of this report are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards, both chemical and radiation, on the health and well-being of all; (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes the progress made this quarter in the following areas: public and professional outreach; science programs; clinical programs; and information support and access systems.

  1. An Assessment of Energy-Related Career Paths of Senior Industrial Assessment Center Program Alumni

    Energy Technology Data Exchange (ETDEWEB)

    Martin, M.A.

    2003-10-20

    The purpose of this study was to assess the career paths of alumni from the U.S. Department of Energy's Industrial Assessment Center (IAC) program. IAC was originally named the Energy Analysis and Diagnostic Center (EADC) program when it began in association with four schools in 1976. The current IAC program provides funding to 26 engineering colleges, located in centers across the United States, to conduct energy, waste, and productivity assessments for small- to medium-sized manufacturing establishments within their respective regions. Through part-time employment with the university, students receive training and in turn conduct assessments for local manufacturers, under the direct supervision of engineering faculty. Annually, IAC participants conduct over 700 assessments, and each assessment generates recommendations for energy savings, energy cost savings, and waste and productivity cost savings customized for individual clients. An earlier study determined that energy savings could be attributed to alumni of the IAC program who take their IAC experiences with them to the professional workplace. During their careers, the alumni conduct additional energy assessments as well as influence energy efficiency through design, teaching and training, and other activities. Indeed, a significant level of program benefits can be attributed to the alumni. This project addressed such specific questions as: How many years after graduation are IAC alumni involved in energy-efficiency activities? What different methods do they use to influence energy-efficiency decisions? To answer these questions, the University of Tennessee, Knoxville (UT) surveyed IAC senior alumni, defined as those who graduated in 1995 or earlier. Section 2 describes the survey used in this research. The actual survey can be found in Appendix A. Section 3 describes our approach to data collection. Section 4 presents descriptive statistics about the senior alumni who responded to the survey. Section 5

  2. Steam generator deposit control program assessment at Comanche Peak

    International Nuclear Information System (INIS)

    Comanche Peak has employed a variety of methods to assess the effectiveness of the deposit control program. These include typical methods such as an extensive visual inspection program and detailed corrosion product analysis and trending. In addition, a recently pioneered technique, low frequency eddy current profile analysis (LFEC) has been utilized. LFEC provides a visual mapping of the magnetite deposit profile of the steam generator. Analysis of the LFEC results not only provides general area deposition rates, but can also provide local deposition patterns, which is indicative of steam generator performance. Other techniques utilized include trending of steam pressure, steam generator hideout-return, and flow assisted corrosion (FAC) results. The sum of this information provides a comprehensive assessment of the deposit control program effectiveness and the condition of the steam generator. It also provides important diagnostic and predictive information relative to steam generator life management and mitigative strategies, such as special cleaning procedures. This paper discusses the techniques employed by Comanche Peak Chemistry to monitor the effectiveness of the deposit control program and describes how this information is used in strategic planning. (authors)

  3. Guidelines for Inter-Enterprise Management (IEM), GLOBEMEN Deliverable D23

    DEFF Research Database (Denmark)

    Tølle, Martin; Vesterager, Johan

    2002-01-01

    This document is a deliverable of Work package 2 of the IMS Globemen (GMN) project: D23 Guidelines for Inter-Enterprise Management (IEM). IMS Globemen is an inter-regional project aiming to develop methods, tools and architectures to support inter-enterprise operations in one-of-kind industries, in...... different lifecycle phases. This report focuses on management of the inter-enterprise delivery process. It is based on the identification of industrial requirements and the specification of the tools in GMN industrial case in EU. These have been reported in earlier deliverables D21 (Requirements) and D22...... (Specification). Correspondingly, this report operates as input for further generalisation over the lifecycle in D43: Guidelines for Virtual Manufacturing Enterprise. The main objective of the deliverable is to describe guidelines how companies may operate in an inter-enterprise environment supported by C...

  4. The iTREN-2030 reference scenario until 2030. Deliverable D4

    Energy Technology Data Exchange (ETDEWEB)

    Fiorello, Davide; De Stasio, Claudia; Koehler, Jonathan; Kraft, Markus; Netwon, Sean; Purwanto, Joko; Schade, Burkhard; Schade, Wolfgang; Szimba, Eckhard

    2009-07-01

    The basic objective of iTREN-2030 is to extend the forecasting and assessment capabilities of the TRANS-TOOLS transport model to the new policy issues arising from the technology, environment and energy fields. This is achieved by couplin the TRANS-TOOLS model with three other models, ASTRA, POLES and TREMOVE covering these new policy issues. The TRANS-TOOLS transport network model has been developed to constitute the reference tool for supporting transport policy in the EU and currently is being developed in several European projects. The scenario set-up to be developed in iTREN-2030 has been modified, so that the projects develops a reference scenario and an integrated scenario. For the reference scenario, the three other modelling tools are harmonised with TRANS-TOOLS and made consistent with each other. This results in a coherent scenario for Europe until 2030 for technology, transport, energy, environment and economic development. The integrated scenario will consider the changing framework conditions until 2030, inparticular the policy pressure coming from climate policy and the increasing scarcity of fossil fuels as well as the impact of the financial and economic crisis. Within the iTREN-2030 project, the overall objective of Work Package 4 (WP4) producing tis deliverable is to develop the reference scenario for the quantitative projections using the four modelling tools involved in the project. The main aims of WP4 are to (a) define a consistent framework for using the different tools in an integrated way; (b) calibrate models with exchanged input to a coherent joint reference; (c) implement external input from WP3 and running models for projections; (d) produce output procedures and templates to facilitate assessment in WP5.

  5. Laboratory Directed Research and Development Program Assessment for FY 2008

    Energy Technology Data Exchange (ETDEWEB)

    Looney, J P; Fox, K J

    2008-03-31

    BNL to respond new scientific opportunities within existing mission areas, as well as to develop new research mission areas in response to DOE and National needs. As the largest expense in BNL's LDRD program is the support graduate students, post-docs, and young scientists, LDRD provides base for continually refreshing the research staff as well as the education and training of the next generation of scientists. The LDRD Program Assessment Report contains a review of the program. The report includes a summary of the management processes, project peer review, and the portfolio's relatedness to BNL's mission, initiatives and strategic plans. Also included are a metric of success indicators and Self Assessment.

  6. SRNL PHASE 1 Assessment Of The WTP Waste Qualification Program

    International Nuclear Information System (INIS)

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project is currently transitioning its emphasis from an engineering design and construction phase toward facility completion, start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements that must be met during the actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program. In general, the waste qualification program involves testing and analysis to demonstrate compliance with waste acceptance criteria, determine waste processability, and demonstrate laboratory-scale unit operations to support WTP operations. The testing and analysis are driven by data quality objectives (DQO) requirements necessary for meeting waste acceptance criteria for transfer of high-level wastes from the tank farms to the WTP, and for ensuring waste processability including proper glass formulations during processing within the WTP complex. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS) which were based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested subject matter experts (SMEs) from SRNL to support a technology exchange with respect to waste qualification programs in which a critical review of the WTP program could be initiated and lessons learned could be shared. The technology exchange was held on July 18-20, 2011 in Richland, Washington, and was the initial step in a multi-phased approach to support development and implementation of a successful waste qualification program at the WTP. The 3-day workshop was hosted by WTP with representatives from the Tank Operations Contractor (TOC) and SRNL in attendance as well as representatives from the US DOE Office of River Protection (ORP) and the Defense Nuclear Facility Safety Board (DNFSB) Site Representative office. The purpose of the

  7. SRNL PHASE 1 ASSESSMENT OF THE WTP WASTE QUALIFICATION PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    Peeler, D.; Hansen, E.; Herman, C.; Marra, S.; Wilmarth, B.

    2012-03-06

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project is currently transitioning its emphasis from an engineering design and construction phase toward facility completion, start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements that must be met during the actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program. In general, the waste qualification program involves testing and analysis to demonstrate compliance with waste acceptance criteria, determine waste processability, and demonstrate laboratory-scale unit operations to support WTP operations. The testing and analysis are driven by data quality objectives (DQO) requirements necessary for meeting waste acceptance criteria for transfer of high-level wastes from the tank farms to the WTP, and for ensuring waste processability including proper glass formulations during processing within the WTP complex. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS) which were based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested subject matter experts (SMEs) from SRNL to support a technology exchange with respect to waste qualification programs in which a critical review of the WTP program could be initiated and lessons learned could be shared. The technology exchange was held on July 18-20, 2011 in Richland, Washington, and was the initial step in a multi-phased approach to support development and implementation of a successful waste qualification program at the WTP. The 3-day workshop was hosted by WTP with representatives from the Tank Operations Contractor (TOC) and SRNL in attendance as well as representatives from the US DOE Office of River Protection (ORP) and the Defense Nuclear Facility Safety Board (DNFSB) Site Representative office. The purpose of the

  8. Capabilities and costs for ancillary services provision by wind power plants. Deliverable D 3.1

    DEFF Research Database (Denmark)

    Faiella, Mariano; Hennig, Tobias; Cutululis, Nicolaos Antonio; Van Hulle, Frans

    This report is the deliverable of the third work package of the REserviceS project and describes the technical options and related costs for the provision of ancillary services specifically from wind energy technologies. It is focused on the set of ancillary services defined in the previous work...... package 2, shown in table 1 below. The information from this deliverable will be used as input to the case studies in subsequent work packages, which are expected to provide additional insights to the actual provision of ancillary services in transmission and distribution networks....

  9. Deliverable D1.1 Go-Lab learning spaces specification

    OpenAIRE

    De Jong, Ton

    2013-01-01

    The current deliverable presents a set of initial specifications of the Go-Lab learning spaces, which is the interface that students see and use when learning with a Go-Lab online lab. These specifications are based on an overview of the literature on the use of cycles in inquiry learning and of the guidance that can be given to students involved in an inquiry process with online labs. The current deliverable is organized as follows: We start with summarizing the main learning goals for learn...

  10. Evaluation of state of the art technologies, GLOBEMEN Deliverable D411

    DEFF Research Database (Denmark)

    van den Berg, Roel; Hannus, Matti; Pedersen, Jens Dahl;

    2000-01-01

    and constructs for background information. The frame for the remainder of the document is set in chapter 4, where ALIVE (Architecture for Layered Integration of Virtual Enterprises) is introduced. Each of the components in ALIVE is subsequently discussed in detail in the chapters 6 to 10. Chapter 5...... discusses reference architectures and methodologies, which should guide a user to fill in the various types of integration as indicated by ALIVE. The first type of integration, inter-enterprise coordination, is not described in this deliverable, but in the various WP1-3 deliverables. The topic of modelling...

  11. Laboratory Directed Research and Development Program Assessment for FY 2007

    Energy Technology Data Exchange (ETDEWEB)

    Newman,L.; Fox, K.J.

    2007-12-31

    becomes a major factor in achieving and maintaining staff excellence and a means to address national needs within the overall mission of the DOE and BNL. The LDRD Program Assessment Report contains a review of the program. The report includes a summary of the management processes, project peer review, and the portfolio's relatedness to BNL's mission, initiatives and strategic plans. Also included are a metric of success indicators and Self Assessment.

  12. LABORATORY DIRECTED RESEARCH AND DEVELOPMENT PROGRAM ASSESSMENT FOR FY 2006.

    Energy Technology Data Exchange (ETDEWEB)

    FOX,K.J.

    2006-01-01

    science and technology ideas, which becomes a major factor in achieving and maintaining staff excellence and a means to address national needs within the overall mission of the DOE and BNL. The LDRD Program Assessment Report contains a review of the program. The report includes a summary of the management processes, project peer review, and the portfolio's relatedness to BNL's mission, initiatives and strategic plans. Also included is a metric of success indicators and Self Assessment.

  13. Tools to Assess the Impact of Teacher Enhancement Programs

    Science.gov (United States)

    Heatherly, S. A.; Maddalena, R. J.; Govett, A.; Hemler, D.

    1997-05-01

    Beginning in 1994, the NRAO has hosted an NSF-funded program, ``Research Experience in Teacher Preparation (RETP),'' in which inservice and preservice science teachers participate in residential institutes lasting one or two weeks. While on site, they conduct open-ended investigations using a 40-foot diameter working radio telescope. The aim of RETP has been to deepen and personalize participants' understanding of the nature of science, and to assist them in applying their newfound knowledge to their classroom teaching. So far RETP, and the teacher enhancement programs from which it evolved, have trained 434 inservice and 69 preservice teachers. The impact of the research experience on teachers' perceptions of themselves as professionals and their views of science was initially assessed through open-ended questionnaires and participant journals. From teachers' responses we learned that the research experience has a profound, positive influence on participants' views of science and increased their confidence in using research-based teaching methods. However, determining what actually happens in the classroom is harder to evaluate and requires a more structured approach. Therefore, to determine what changes occurred in teachers and their students, five survey instruments were developed. The instruments: 1) assess changes in teachers' perceptions of their ability to conduct research; 2) gauge teachers' perceptions of three aspects of the institute; 3) measure changes in teachers' concerns about implementing classroom research projects; 4) evaluate the development of teachers' understanding into the nature of science; and 5) determine changes in their students' perceptions of science and science class. To increase the reliability of the instruments, the survey questions were tested for internal consistency. Early results show that the RETP program has significantly affected participants and their students. These instruments are useful not only for evaluating this

  14. Clinical specialization programs for dietitians: a needs assessment.

    Science.gov (United States)

    Bellman, J C; Nestor, L M

    1995-01-01

    This needs assessment was conducted to identify the perceived need for advancement and specialization through practicum programs in clinical dietetics. A questionnaire was developed and validated through a pilot study. It was mailed to a randomized sample of 950 dietitians (52%) registered with the ODA. Fifty two per cent responded, representing 27% of ODA members. Of those surveyed 89% were currently employed. The most current area of practice was clinical nutrition (55%) followed by foodservice (22%) and community nutrition (14%). Seventy two per cent of the respondents identified that they would consider enrolling in a specialized practicum. Most cited reasons for enrolling were increased knowledge/expertise (44%) and increased professional profile (25%). Areas of greatest interest were: nutrition assessment (9%), critical care/nutrition support (8%) and gerontology (7.5%). Sixty two per cent preferred the program to be offered part-time, 27% full-time and 9% were impartial. The most frequently cited length and cost per week for the program within specified part or full-time categories was: two weeks full-time (36.5%) at S200-299.00 (33%), four weeks full-time (25%) at S100-199.00 (31%) and two weeks part or full-time (23.5%) at S200-299.00 (57%). Desired ODA regions for program availability were: Toronto (34%), Kitchener/Waterloo/Hamilton (17.5%) and London (14%). Lastly, 92% of the respondents felt the program should be CDA and ODA approved and continuing education points be provided. These results indicate that dietitians are interested in pursuing professional self-development through specialized practicums. PMID:10153678

  15. OPTIMISE - Deliverable D4.2 Deliver optimised samples made by two axis rolling to UNIVERSITY OF TWENTE, month 11

    DEFF Research Database (Denmark)

    Eriksen, Morten

    This report explains why the deliverables of optimised samples made by two axis rolling was not send to UNIVERSITY OF TWENTE.......This report explains why the deliverables of optimised samples made by two axis rolling was not send to UNIVERSITY OF TWENTE....

  16. Research on effectiveness assessment programs for physical protection system

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Janghoon; Yoo, Hosik; Ham, Taekyu [Korea Institute of Nuclear Non-proliferation and Control, Daejeon (Korea, Republic of)

    2015-05-15

    PPS (Physical Protection System) is an integrated set of procedures, installation and human resources to protect valuable assets from physical attack of potential adversaries. Since nuclear facilities or radioactive materials can be attractive targets for terrorists, PPS should be installed and maintained throughout the entire lifecycle of nuclear energy systems. One of key ingredients for effective protection is a reliable assessment procedure of the PPS capability. Due to complexity of possible threat categories and pathways, several pathway analysis programs have been developed to ease analysis or visualization. ASSESS using ASD approach runs fast and adopts a relatively simple modeling process for facility elements. But uncertainty due to assumptions used in modeling might complicate the interpretation of results. On the other hand, 2D pathway program such as TESS can utilize more self-consistent detection probability and delay time since actual pathway on 2D map is available. Also, this pathway visualization helps users understand analysis result more intuitively. But, in general, 2D pathway programs require strong computational power and careful optimization. Another possible difference between two approaches is response force deployment and RFT.

  17. Environmental Hazards Assessment Program quarterly report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-30

    The objectives of the Environmental Hazards Assessment Program (EHAP) stated in the proposal to DOE are to: develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter (January--March) of the third year of the grant. It reports progress against these grant objectives and the Program Implementation Plan published at the end of the first year of the grant. Questions, comments, or requests for further information concerning the activities under this grant can be forwarded to Jack Davis in the EHAP office of the Medical University of South Carolina at (803) 727-6450.

  18. A Computer Program for Assessing Nuclear Safety Culture Impact

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kiyoon; Jae, Moosung [Hanyang Univ., Seoul (Korea, Republic of)

    2014-10-15

    Through several accidents of NPP including the Fukushima Daiichi in 2011 and Chernobyl accidents in 1986, a lack of safety culture was pointed out as one of the root cause of these accidents. Due to its latent influences on safety performance, safety culture has become an important issue in safety researches. Most of the researches describe how to evaluate the state of the safety culture of the organization. However, they did not include a possibility that the accident occurs due to the lack of safety culture. Because of that, a methodology for evaluating the impact of the safety culture on NPP's safety is required. In this study, the methodology for assessing safety culture impact is suggested and a computer program is developed for its application. SCII model which is the new methodology for assessing safety culture impact quantitatively by using PSA model. The computer program is developed for its application. This program visualizes the SCIs and the SCIIs. It might contribute to comparing the level of the safety culture among NPPs as well as improving the management safety of NPP.

  19. A Computer Program for Assessing Nuclear Safety Culture Impact

    International Nuclear Information System (INIS)

    Through several accidents of NPP including the Fukushima Daiichi in 2011 and Chernobyl accidents in 1986, a lack of safety culture was pointed out as one of the root cause of these accidents. Due to its latent influences on safety performance, safety culture has become an important issue in safety researches. Most of the researches describe how to evaluate the state of the safety culture of the organization. However, they did not include a possibility that the accident occurs due to the lack of safety culture. Because of that, a methodology for evaluating the impact of the safety culture on NPP's safety is required. In this study, the methodology for assessing safety culture impact is suggested and a computer program is developed for its application. SCII model which is the new methodology for assessing safety culture impact quantitatively by using PSA model. The computer program is developed for its application. This program visualizes the SCIs and the SCIIs. It might contribute to comparing the level of the safety culture among NPPs as well as improving the management safety of NPP

  20. Flammability Assessment Methodology Program Phase I: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Loehr; S. M. Djordjevic; K. J. Liekhus; M. J. Connolly

    1997-09-01

    The Flammability Assessment Methodology Program (FAMP) was established to investigate the flammability of gas mixtures found in transuranic (TRU) waste containers. The FAMP results provide a basis for increasing the permissible concentrations of flammable volatile organic compounds (VOCs) in TRU waste containers. The FAMP results will be used to modify the ''Safety Analysis Report for the TRUPACT-II Shipping Package'' (TRUPACT-II SARP) upon acceptance of the methodology by the Nuclear Regulatory Commission. Implementation of the methodology would substantially increase the number of drums that can be shipped to the Waste Isolation Pilot Plant (WIPP) without repackaging or treatment. Central to the program was experimental testing and modeling to predict the gas mixture lower explosive limit (MLEL) of gases observed in TRU waste containers. The experimental data supported selection of an MLEL model that was used in constructing screening limits for flammable VOC and flammable gas concentrations. The MLEL values predicted by the model for individual drums will be utilized to assess flammability for drums that do not meet the screening criteria. Finally, the predicted MLEL values will be used to derive acceptable gas generation rates, decay heat limits, and aspiration time requirements for drums that do not pass the screening limits. The results of the program demonstrate that an increased number of waste containers can be shipped to WIPP within the flammability safety envelope established in the TRUPACT-II SARP.

  1. An airborne dispersion/dose assessment computer program. Phase 1

    International Nuclear Information System (INIS)

    The Atomic Energy Control Board (AECB) staff have a need for an airborne dispersion-dose assessment computer programme for a microcomputer. The programme must be capable of analyzing the dispersion of both radioactive and non-radioactive materials. A further requirement of the programme is that it be implemented on the AECB complex of microcomputers and that it have an advanced graphical user interface. A survey of computer programs was conducted to determine which, if any, could meet the AECB's requirements in whole or in part. Ten programmes were selected for detailed review including programs for nuclear and non-radiological emergencies. None of the available programmes for radiation dose assessment meets all the requirements for reasons of user interaction, method of source term estimation or site specificity. It is concluded that the best option for meeting the AECB requirements is to adopt the CAMEO programme (specifically the ALOHA portion) which has a superior graphical user interface and add the necessary models for radiation dose assessment

  2. MASCOT and MOP programs for probabilisitic safety assessment. Pt. E

    International Nuclear Information System (INIS)

    MOP is a post-processor for the probabilistic safety assessment program MASCOT, which models the consequences of the disposal of radioactive waste. This document provides a general description of the capabilities of the MOP program, together with a comprehensive guide to the MOP user command language that exists in version 2E. MOP is able to calculate and present various statistical measures of the modelled radiological consequences, in both printed and graphical form. The results of intermediate analyses can be saved from one MOP job to the next, and this allows MOP to be used as many times as desired to process the results of the same MASCOT job. MOP can work with the quantities passed to it from the MASCOT job or with new quantities, defined and calculated according to individual requirements. This is usually done by transforming the MASCOT quantities using algebraic expressions. (author)

  3. Air resource management program assessment (Rocky Mountain Region)

    International Nuclear Information System (INIS)

    The Rocky Mountain Region of the USDA Forest Service comprises 17 National Forests and seven National Grasslands in Colorado, Wyoming, Nebraska, and South Dakota. These contain sensitive ecosystems and spectacular scenery which can be harmed by existing and future air pollution. To minimize or prevent such damage, the Region has created the Air Resource Management Program Assessment. Its basic purpose is to ensure that the Region's most sensitive ecosystems will be identified and protected. Also, by helping to coordinate air resource management activities between Forests, unnecessary duplication of effort will be minimized

  4. SAVI: a pc-based vulnerability assessment program

    International Nuclear Information System (INIS)

    SAVI (Systematic Analysis of Vulnerability to Intrusion) represents a new generation of analyses programs, which assess the vulnerability of a physical protection system and are designed for use on personal computers. Features unique to SAVI include (a) analysis of all adversary paths, (b) a safeguards-component catalog with a detection/delay performance database, (c) results in graphic form, and (d) path-upgrade recommendations. The primary figure of merit calculated for system effectiveness is the probability of adversary interruption before mission completion. SAVI has been taught to more than 200 security analysts from the US Dept. of Energy and is currently its standard tool for outsider-threat vulnerability analysis

  5. An assessment of bacterial small RNA target prediction programs

    OpenAIRE

    Pain, Adrien; Ott, Alban; Amine, Hamza; Rochat, Tatiana; Bouloc, Philippe; Gautheret, Daniel

    2015-01-01

    Most bacterial regulatory RNAs exert their function through base-pairing with target RNAs. Computational prediction of targets is a busy research field that offers biologists a variety of web sites and software. However, it is difficult for a non-expert to evaluate how reliable those programs are. Here, we provide a simple benchmark for bacterial sRNA target prediction based on trusted E. coli sRNA/target pairs. We use this benchmark to assess the most recent RNA target predictors as well as ...

  6. Severe accident sequence assessment for boiling water reactors: program overview

    International Nuclear Information System (INIS)

    The Severe Accident Sequence Assessment (SASA) Program was started at the Oak Ridge National Laboratory (ORNL) in June 1980. This report documents the initial planning, specification of objectives, potential uses of the results, plan of attack, and preliminary results. ORNL was assigned the Brown's Ferry Unit 1 Plant with the station blackout being the initial sequence set to be addressed. This set includes: (1) loss of offsite and onsite ac power with no coolant injection; and (2) loss of offsite and onsite ac power with high pressure coolant injection (HPCI) and reactor core isolation cooling (RCIC) as long as dc power supply lasts. This report includes representative preliminary results for the former case

  7. Power plant system assessment. Final report. SP-100 Program

    International Nuclear Information System (INIS)

    The purpose of this assessment was to provide system-level insights into 100-kWe-class space reactor electric systems. Using these insights, Rockwell was to select and perform conceptual design studies on a ''most attractive'' system that met the preliminary design goals and requirements of the SP-100 Program. About 4 of the 6 months were used in the selection process. The remaining 2 months were used for the system conceptual design studies. Rockwell completed these studies at the end of FY 1983. This report summarizes the results of the power plant system assessment and describes our choice for the most attractive system - the Rockwell SR-100G System (Space Reactor, 100 kWe, Growth) - a lithium-cooled UN-fueled fast reactor/Brayton turboelectric converter system

  8. Field Assessment of Energy Audit Tools for Retrofit Programs

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, J. [Univ. of Minnesota, St. Paul, MN (United States); Bohac, D. [Univ. of Minnesota, St. Paul, MN (United States); Nelson, C. [Univ. of Minnesota, St. Paul, MN (United States); Smith, I. [Univ. of Minnesota, St. Paul, MN (United States)

    2013-07-01

    This project focused on the use of home energy ratings as a tool to promote energy retrofits in existing homes. A home energy rating provides a quantitative appraisal of a home’s energy performance, usually compared to a benchmark such as the average energy use of similar homes in the same region. Rating systems based on energy performance models, the focus of this report, can establish a home’s achievable energy efficiency potential and provide a quantitative assessment of energy savings after retrofits are completed, although their accuracy needs to be verified by actual measurement or billing data. Ratings can also show homeowners where they stand compared to their neighbors, thus creating social pressure to conform to or surpass others. This project field-tested three different building performance models of varying complexity, in order to assess their value as rating systems in the context of a residential retrofit program: Home Energy Score, SIMPLE, and REM/Rate.

  9. Outlook for Alberta production and deliverability in relation to domestic and export markets of natural gas

    International Nuclear Information System (INIS)

    Cautious optimism about the deliverability of Alberta natural gas during the 1993/1994 heating season is justified. There are not likely to be the shortages of the previous winter. These predictions are based on favourable reserve and production figures together with an increase in drilling activity. There are also more disciplined contracting practices and a positive outlook for available pipeline capacity. (author)

  10. Deliverable 1.2.7: Cross-cultural benefit segmentation of consumers

    NARCIS (Netherlands)

    Reinders, M.J.; Onwezen, M.C.; Sijtsema, S.J.; Zimmermann, K.L.; Berg, van den I.; Jasiulewicz, A.; Guardia, M.D.; Guerrero, L.

    2010-01-01

    The present report, deliverable D.1.2.7, gives a final view of the work done in ISAFruit Work Package (WP) 1.2. Average Europe fruit consumption is below the recommended level and moreover the consumption level is still decreasing in Europe. A large survey was carried out in four European countries

  11. Fluctuations and predictability of wind and hydropower. Deliverable 2.1

    DEFF Research Database (Denmark)

    Giebel, Gregor; Holttinen, H.; Söder, L.; Petterteig, A.

    2004-01-01

    The report forms the deliverable D2.1 of the EU supported project Wind Power Integration in a Liberalised Electricity Market (WILMAR). The handling and generation of the necessary wind and hydro time series for the project’s power system planningsimulation model is described. The wind power and t...

  12. Application of new and novel fracture stimulation technologies to enhance the deliverability of gas storage wells

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Based on the information presented in this report, our conclusions regarding the potential for new and novel fracture stimulation technologies to enhance the deliverability of gas storage wells are as follows: New and improved gas storage well revitalization methods have the potential to save industry on the order of $20-25 million per year by mitigating deliverability decline and reducing the need for costly infill wells Fracturing technologies have the potential to fill this role, however operators have historically been reluctant to utilize this approach due to concerns with reservoir seal integrity. With advanced treatment design tools and methods, however, this risk can be minimized. Of the three major fracturing classifications, namely hydraulic, pulse and explosive, two are believed to hold potential to gas storage applications (hydraulic and pulse). Five particular fracturing technologies, namely tip-screenout fracturing, fracturing with liquid carbon dioxide, and fracturing with gaseous nitrogen, which are each hydraulic methods, and propellant and nitrogen pulse fracturing, which are both pulse methods, are believed to hold potential for gas storage applications and will possibly be tested as part of this project. Field evidence suggests that, while traditional well remediation methods such as blowing/washing, mechanical cleaning, etc. do improve well deliverability, wells are still left damaged afterwards, suggesting that considerable room for further deliverability enhancement exists. Limited recent trials of hydraulic fracturing imply that this approach does in fact provide superior deliverability results, but further RD&D work is needed to fully evaluate and demonstrate the benefits and safe application of this as well as other fracture stimulation technologies.

  13. Nevada Risk Assessment/Management Program scientific peer review

    International Nuclear Information System (INIS)

    The 1,350 square-mile Nevada Test Site and additional sites in Nevada served as the continental sites for US nuclear weapons testing from 1951 to 1992. The Nevada Risk Assessment/Management Program (NRAMP) is a currently on-going effort of the Harry Reid Center for Environmental Studies at the University of Nevada, Las Vegas (UNLV) and the firm of E. J. Bentz and Associates, Inc., in cooperation with the US Department of Energy (DOE) Environmental Management Program. Argonne National Laboratory is one of several public and private organizations supporting personnel appointed by the NRAMP to the NRAMP Scientific Peer Review Panel. The NRAMP is part of a national effort by the DOE to develop new sources of information and approaches to risk assessment, risk management, risk communication, and public outreach relevant to the ecological and human health effects of radioactive and hazardous materials management and site remediation activities. This paper describes the development, conduct, and current results of the scientific peer review process which supports the goals of the NRAMP

  14. TRECII: a computer program for transportation risk assessment

    International Nuclear Information System (INIS)

    A risk-based fault tree analysis method has been developed at the Pacific Northwest Laboratory (PNL) for analysis of nuclear fuel cycle operations. This methodology was developed for the Department of Energy (DOE) as a risk analysis tool for evaluating high level waste management systems. A computer package consisting of three programs was written at that time to assist in the performance of risk assessment: ACORN (draws fault trees), MFAULT (analyzes fault trees), and RAFT (calculates risk). This methodology evaluates release consequences and estimates the frequency of occurrence of these consequences. This document describes an additional risk calculating code which can be used in conjunction with two of the three codes for transportation risk assessment. TRECII modifies the definition of risk used in RAFT (prob. x release) to accommodate release consequences in terms of fatalities. Throughout this report risk shall be defined as probability times consequences (fatalities are one possible health effect consequence). This methodology has been applied to a variety of energy material transportation systems. Typically the material shipped has been radioactive, although some adaptation to fossil fuels has occurred. The approach is normally applied to truck or train transport systems with some adaptation to pipelines and aircraft. TRECII is designed to be used primarily in conjunction with MFAULT; however, with a moderate amount of effort by the user, it can be implemented independent of the risk analysis package developed at PNL. Code description and user instructions necessary for the implementation of the TRECII program are provided

  15. Final Environmental assessment for the Uranium Lease Management Program

    International Nuclear Information System (INIS)

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE's ''best interest'' is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI)

  16. TRECII: a computer program for transportation risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Franklin, A.L.

    1980-05-01

    A risk-based fault tree analysis method has been developed at the Pacific Northwest Laboratory (PNL) for analysis of nuclear fuel cycle operations. This methodology was developed for the Department of Energy (DOE) as a risk analysis tool for evaluating high level waste management systems. A computer package consisting of three programs was written at that time to assist in the performance of risk assessment: ACORN (draws fault trees), MFAULT (analyzes fault trees), and RAFT (calculates risk). This methodology evaluates release consequences and estimates the frequency of occurrence of these consequences. This document describes an additional risk calculating code which can be used in conjunction with two of the three codes for transportation risk assessment. TRECII modifies the definition of risk used in RAFT (prob. x release) to accommodate release consequences in terms of fatalities. Throughout this report risk shall be defined as probability times consequences (fatalities are one possible health effect consequence). This methodology has been applied to a variety of energy material transportation systems. Typically the material shipped has been radioactive, although some adaptation to fossil fuels has occurred. The approach is normally applied to truck or train transport systems with some adaptation to pipelines and aircraft. TRECII is designed to be used primarily in conjunction with MFAULT; however, with a moderate amount of effort by the user, it can be implemented independent of the risk analysis package developed at PNL. Code description and user instructions necessary for the implementation of the TRECII program are provided.

  17. Final Environmental assessment for the Uranium Lease Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  18. Technology Assessment and Roadmap for the Emergency Radiation Dose Assessment Program

    International Nuclear Information System (INIS)

    A Joint Interagency Working Group (JIWG) under the auspices of the Department of Homeland Security Office of Research and Development conducted a technology assessment of emergency radiological dose assessment capabilities as part of the overall need for rapid emergency medical response in the event of a radiological terrorist event in the United States. The goal of the evaluation is to identify gaps and recommend general research and development needs to better prepare the Country for mitigating the effects of such an event. Given the capabilities and roles for responding to a radiological event extend across many agencies, a consensus of gaps and suggested development plans was a major goal of this evaluation and road-mapping effort. The working group consisted of experts representing the Departments of Homeland Security, Health and Human Services (Centers for Disease Control and the National Institutes of Health), Food and Drug Administration, Department of Defense and the Department of Energy's National Laboratories (see appendix A for participants). The specific goals of this Technology Assessment and Roadmap were to: (1) Describe the general context for deployment of emergency radiation dose assessment tools following terrorist use of a radiological or nuclear device; (2) Assess current and emerging dose assessment technologies; and (3) Put forward a consensus high-level technology roadmap for interagency research and development in this area. This report provides a summary of the consensus of needs, gaps and recommendations for a research program in the area of radiation dosimetry for early response, followed by a summary of the technologies available and on the near-term horizon. We then present a roadmap for a research program to bring present and emerging near-term technologies to bear on the gaps in radiation dose assessment and triage. Finally we present detailed supporting discussion on the nature of the threats we considered, the status of technology

  19. Technology Assessment and Roadmap for the Emergency Radiation Dose Assessment Program

    Energy Technology Data Exchange (ETDEWEB)

    Turteltaub, K W; Hartman-Siantar, C; Easterly, C; Blakely, W

    2005-10-03

    A Joint Interagency Working Group (JIWG) under the auspices of the Department of Homeland Security Office of Research and Development conducted a technology assessment of emergency radiological dose assessment capabilities as part of the overall need for rapid emergency medical response in the event of a radiological terrorist event in the United States. The goal of the evaluation is to identify gaps and recommend general research and development needs to better prepare the Country for mitigating the effects of such an event. Given the capabilities and roles for responding to a radiological event extend across many agencies, a consensus of gaps and suggested development plans was a major goal of this evaluation and road-mapping effort. The working group consisted of experts representing the Departments of Homeland Security, Health and Human Services (Centers for Disease Control and the National Institutes of Health), Food and Drug Administration, Department of Defense and the Department of Energy's National Laboratories (see appendix A for participants). The specific goals of this Technology Assessment and Roadmap were to: (1) Describe the general context for deployment of emergency radiation dose assessment tools following terrorist use of a radiological or nuclear device; (2) Assess current and emerging dose assessment technologies; and (3) Put forward a consensus high-level technology roadmap for interagency research and development in this area. This report provides a summary of the consensus of needs, gaps and recommendations for a research program in the area of radiation dosimetry for early response, followed by a summary of the technologies available and on the near-term horizon. We then present a roadmap for a research program to bring present and emerging near-term technologies to bear on the gaps in radiation dose assessment and triage. Finally we present detailed supporting discussion on the nature of the threats we considered, the status of

  20. National Acid Precipitation Assessment Program Report to Congress: An Integrated Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Uhart, M.; et al,

    2005-08-01

    Under Title IX of the 1990 Clean Air Act Amendments, Congress reauthorized the National Acid Precipitation Assessment Program (NAPAP) to continue coordinating acid rain research and monitoring, as it had done during the previous decade, and to provide Congress with periodic reports. In particular, Congress asked NAPAP to assess all available data and information to answer two questions: (1) What are the costs, benefits, and effectiveness of Title IV? This question addresses the costs and economic impacts of complying with the Acid Rain Program as well as benefit analyses associated with the various human health and welfare effects, including reduced visibility, damages to materials and cultural resources, and effects on ecosystems. (2) What reductions in deposition rates are needed to prevent adverse ecological effects? This complex questions addresses ecological systems and the deposition levels at which they experience harmful effects. The results of the assessment of the effects of Title IV and of the relationship between acid deposition rates and ecological effects were to be reported to Congress quadrennially, beginning with the 1996 report to Congress. The objective of this Report is to address the two main questions posed by Congress and fully communicate the results of the assessment to decision-makers. Given the primary audience, most of this report is not written as a technical document, although information supporting the conclusions is provided along with references.

  1. Environmental hazards assessment program. Quarterly report, July 1996--September 1996

    International Nuclear Information System (INIS)

    On June 23, 1992, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FG01-92EW50625 with the Medical University of South Carolina (MUSC) to support the Environmental Hazards Assessment Program (EHAP). Dr. James B. Edwards, President of the Medical University of South Carolina, suggested, open-quotes Good health is not the result of good doctoring but the result of a healthy society in a healthy, economic, political and biological environment.close quotes To further good health, it is appropriate that an educational institution such as MUSC utilize grant funds to help people from all walks of life understand better what truly does affect human health, what does not, and why

  2. Ageing airplane repair assessment program for Airbus A300

    Science.gov (United States)

    Gaillardon, J. M.; Schmidt, HANS-J.; Brandecker, B.

    1992-01-01

    This paper describes the current status of the repair categorization activities and includes all details about the methodologies developed for determination of the inspection program for the skin on pressurized fuselages. For inspection threshold determination two methods are defined based on fatigue life approach, a simplified and detailed method. The detailed method considers 15 different parameters to assess the influences of material, geometry, size location, aircraft usage, and workmanship on the fatigue life of the repair and the original structure. For definition of the inspection intervals a general method is developed which applies to all concerned repairs. For this the initial flaw concept is used by considering 6 parameters and the detectable flaw sizes depending on proposed nondestructive inspection methods. An alternative method is provided for small repairs allowing visual inspection with shorter intervals.

  3. [Environmental Hazards Assessment Program annual report, June 1992--June 1993

    International Nuclear Information System (INIS)

    It is becoming increasingly clear that human health is intricately related to our chemical and physical surroundings. Recognizing the interdependence between health and environment, the Medical University of South Carolina has begun to implement a graduate program in Environmental Risk Assessment. While the infrastructure for such a program had been in place for quite a while, providing education in biostatistics, epidemiology, and mathematical modeling, specific courses in risk assessment were not available. To expedite the educational process in this area, the Department of Biometry and Epidemiology offered the course Special Topics in Risk Analysis in the Spring semester of 1993. This course was intended as an introduction for graduate students, but one faculty and one postdoctoral fellow also enrolled. The course was organized in the form of a seminar, with students or faculty presenting selected materials from the literature that covered some of the central issues in risk analysis. The presentations were subsequently written up as reports and revised according to suggestions by the instructor. This technical report comprises the presentations and reflects what has been learned in the course Special Topics in Risk Analysis. It also may serve as an easy to read introduction to the complex area of risk analysis. By the very nature of the course and this report, most of the presented material is not original. It does not necessarily reflect the authors' or the editor's opinion and is not intended for citation. Nonetheless, the students and the instructor have paid attention to citing relevant literature in order to enable the reader to trace ideas back to the original sources. As an Appendix, this volume contains the course syllabus as well as hand-out material that the students prepared independently and that has not been edited or revised

  4. Plethyzmography in assessment of hemodynamic results of pacemaker functions programming

    Science.gov (United States)

    Wojciechowski, Dariusz; Sionek, Piotr; Peczalski, Kazimierz; Janusek, Dariusz

    2011-01-01

    The paper presents potential role of plethyzmography in optimization of heart hemodynamic function during pacemaker programming. The assessment of optimal stroke volume in patients, with implanted dual chamber pacemaker (DDD), by plethyzmography was a goal of the study. The data were collected during pacing rhythm. 20 patients (8 female and 12 male, average 77.4+/-4.6 years) with dual chamber pacemaker (DDD) and with pacing rhythm during routine pacemaker control and study tests were incorporated in the study group. Hemodynamic parameters were assessed during modification of atrio-ventricular delay (AVD) for pacing rhythm of 70 bpm and 90 bpm. The time of atrioventricular was programmed with 20 ms steps within range 100-200 ms and data were recorded with two minutes delay between two consecutive measurements. Stroke volume (SV) and cardiac output (CO) were calculated from plethyzmographic signal by using Beatscope software (TNO Holand). Highest SV calculated for given pacing rhythm was named optimal stroke volume (OSV) and consequently highest cardiac output was named maximal cardiac output (MCO). The time of atrio-ventricular delay for OSV was named optimal atrioventricular delay (OAVD). The results have showed: mean values of OAVD for 70 bpm - 152+/-33 ms and for 90 bpm -149+/-35 ms, shortening of the mean OAVD time caused by increase of pacing rate from 70 bpm to 90 bpm what resulted in statistically significant decrease of OSV with not statistically significant increase of MCO. The analysis of consecutive patients revealed three types of response to increase of pacing rhythm: 1. typical-shortening of OAVD, 2. neutral-no change of OAVD and 3.atypical-lengthening of OAVD.

  5. Cernavoda NPP training programs The paper presents a general assessment of Cernavoda NPP personnel training programs,

    International Nuclear Information System (INIS)

    The paper presents a general assessment of Cernavoda NPP personnel training programs, highlighting the role of training in human performance improvement. Cernavoda NPP Personnel Training and Authorization Department (PTAD) is responsible for the training of CNE Cernavoda NPP personnel and its contractors. PTAD is structured in a manner ensuring the support and response to all plant training, qualification and authorization requirements. The training of personnel is continuously adapted based on IAEA Guides and INPO/WANO recommendations, to keep with world standards, based on the internal and external reviews. At Cernavoda NPP the Training Concept and the Training Programs are based on SAT - Systematic Approach to Training. The Training Concept is established on a set of training documents (RD's, SI's, IDP's), which address all the SAT phases: Analysis, Design, Development, Implementation and Evaluation. The Training Programs are structured on the initial and continuing personnel training. Their content and goals are responding to the training specific needs for each plant major job family. In order to successfully support NPP training programs, CNPP training center has upgraded classrooms with new presentation facilities and there are plans to expand the space of the building, to develop additional operator and maintenance skills facilities. By responding in a timely and completely manner to all plant training requirements PTAD will help in rising human performance of Cernavoda NPP personnel, supporting the safe, efficient and cost effective production of power. (author)

  6. Static tests of the propulsion system. [Propfan Test Assessment program

    Science.gov (United States)

    Withers, C. C.; Bartel, H. W.; Turnberg, J. E.; Graber, E. J.

    1987-01-01

    Advanced, highly-loaded, high-speed propellers, called propfans, are promising to revolutionize the transport aircraft industry by offering a 15- to 30-percent fuel savings over the most advanced turbofans without sacrificing passenger comfort or violating community noise standards. NASA Lewis Research Center and industry have been working jointly to develop the needed propfan technology. The NASA-funded Propfan Test Assessment (PTA) Program represents a key element of this joint program. In PTA, Lockheed-Georgia, working in concert with Hamilton Standard, Rohr Industries, Gulfstream Aerospace, and Allison, is developing a propfan propulsion system which will be mounted on the left wing of a modified Gulfstream GII aircraft and flight tested to verify the in-flight characteristics of a 9-foot diameter, single-rotation propfan. The propfan, called SR-7L, was designed and fabricated by Hamilton Standard under a separate NASA contract. Prior to flight testing, the PTA propulsion system was static tested at the Rohr Brown Field facility. In this test, propulsion system operational capability was verified and data was obtained on propfan structural response, system acoustic characteristics, and system performance. This paper reports on the results of the static tests.

  7. The Global Seismic Hazard Assessment Program (GSHAP - 1992/1999

    Directory of Open Access Journals (Sweden)

    D. Giardini

    1999-06-01

    Full Text Available The United Nations, recognizing natural disasters as a major threat to human life and development, designed the 1990-1999 period as the International Decade for Natural Disaster Reduction (UN/IDNDR; UN Res. 42/169/ 1987. Among the IDNDR Demonstration Projects is the Global Seismic Hazard Assessment Program (GSHAP, launched in 1992 by the International Lithosphere Program (ILP and implemented in the 1992-1999 period. In order to mitigate the risk associated to the recurrence of earthquakes, the GSHAP promoted a regionally coordinated, homogeneous approach to seismic hazard evaluation. To achieve a global dimension, the GSHAP established initially a mosaic of regions and multinational test areas, then expanded to cover whole continents and finally the globe. The GSHAP Global Map of Seismic Hazard integrates the results obtained in the regional areas and depicts Peak-Ground-Acceleration (PGA with 10% chance of exceedance in 50 years, corresponding to a return period of 475 years. All regional results and the Global Map of Seismic Hazard are published in 1999 and available on the GSHAP homepage on http://seismo.ethz.ch/GSHAP/.

  8. Developing a comprehensive scale to assess college multicultural programming.

    Science.gov (United States)

    Mallinckrodt, Brent; Miles, Joseph R; Bhaskar, Tripti; Chery, Nicole; Choi, Gahee; Sung, Mi-Ra

    2014-01-01

    A barrier to assessing effectiveness of multicultural programming is lack of a relatively brief instrument to measure the wide range of intended outcomes. A frequent goal of programming is to increase cultural empathy, but this is rarely the only intended outcome. We conducted focus groups of campus administrators, student affairs staff, and undergraduate instructors who identified a full range of racial/ethnic multicultural competencies that undergraduates should possess. An 84-item pool generated from these focus groups was combined with the 31-item Scale of Ethnocultural Empathy (SEE; Wang et al., 2003). These 115 items, together with instruments used to gauge concurrent validity, were administered to White undergraduate students in introductory psychology courses at the midpoint (n = 602) and end (n = 676) of fall semester. Exploratory factor analysis suggested 6 subscales for the Everyday Multicultural Competencies/Revised SEE (EMC/RSEE): (a) Cultural Openness and Desire to Learn; (b) Resentment and Cultural Dominance; (c) Anxiety and Lack of Multicultural Self-Efficacy; (d) Empathic Perspective-Taking; (e) Awareness of Contemporary Racism and Privilege; and (f) Empathic Feeling and Acting as an Ally. Item response theory principles guided final selection of subscale items. Analyses suggested good factor stability, reliability, and discriminant validity of the 48-item EMC/RSEE in these undergraduate samples. EMC/RSEE subscales were not strongly correlated with a measure of impression management and were significantly associated with measures of Openness to Diversity Challenge, and Universal-Diverse Orientation. PMID:24447061

  9. Field Assessment of Energy Audit Tools for Retrofit Programs

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, J.; Bohac, D.; Nelson, C.; Smith, I.

    2013-07-01

    This project focused on the use of home energy ratings as a tool to promote energy retrofits in existing homes. A home energy rating provides a quantitative appraisal of a home's asset performance, usually compared to a benchmark such as the average energy use of similar homes in the same region. Home rating systems can help motivate homeowners in several ways. Ratings can clearly communicate a home's achievable energy efficiency potential, provide a quantitative assessment of energy savings after retrofits are completed, and show homeowners how they rate compared to their neighbors, thus creating an incentive to conform to a social standard. An important consideration is how rating tools for the retrofit market will integrate with existing home energy service programs. For residential programs that target energy savings only, home visits should be focused on key efficiency measures for that home. In order to gain wide adoption, a rating tool must be easily integrated into the field process, demonstrate consistency and reasonable accuracy to earn the trust of home energy technicians, and have a low monetary cost and time hurdle for homeowners. Along with the Home Energy Score, this project also evaluated the energy modeling performance of SIMPLE and REM/Rate.

  10. Vending Assessment and Program Implementation in Four Iowa Worksites.

    Science.gov (United States)

    Lillehoj, Catherine J; Nothwehr, Faryle; Shipley, Kala; Voss, Carol

    2015-11-01

    The worksite food environment, including vending options, has been explored as an important contributor to dietary decisions made every day. The current study describes the vending environment, and efforts to change it, in four Iowa worksites using a series of case studies. Data were gathered by local coordinators as part of the Iowa Community Transformation Grant project. Data were collected from three sources. First, the Nutrition Environment Measures Survey-Vending was used to assess healthy vending options in worksite machines before and after the intervention. Second, employee vending behavior was evaluated with a pre-, post-intervention survey. Items assessed attitudes and behaviors regarding vending, plus awareness and reaction to intervention activities. Third, program coordinators documented vending machine intervention strategies used, such as social marketing materials and product labels. The Nutrition Environment Measures Survey-Vending documented that the majority of vending options did not meet criteria for healthfulness. The vending survey found that employees were generally satisfied with the healthier items offered. Some differences were noted over time at the four worksites related to employee behavior and attitudes concerning healthy options. There were also differences in intervention implementation and the extent of changes made by vending companies. Overall, findings demonstrate that a large percentage of employees are constrained in their ability to access healthy foods due to limited worksite vending options. There also remain challenges to making changes in this environment. Findings have implications for public health practitioners to consider when designing healthy vending interventions in worksites. PMID:26220278

  11. Conformal coating value/risk assessment for Sandia satellite programs.

    Energy Technology Data Exchange (ETDEWEB)

    Russick, Edward Mark; Thayer, Gayle Echo

    2008-03-01

    Conformal coatings are used in space applications on printed circuit board (PCB) assemblies primarily as a protective barrier against environmental contaminants. Such coatings have been used at Sandia for decades in satellite applications including the GPS satellite program. Recently, the value of conformal coating has been questioned because it is time consuming (requiring a 5-6 week schedule allowance) and delays due to difficulty of repairs and rework performed afterward are troublesome. In an effort to find opportunities where assembly time can be reduced, a review of the literature as well as discussions with satellite engineers both within and external to Sandia regarding the value of conformal coating was performed. Several sources on the value of conformal coating, the functions it performs, and on whether coatings are necessary and should be used at all were found, though nearly all were based on anecdotal information. The first section of this report, titled 'Conformal Coating for Space Applications', summarizes the results of an initial risk-value assessment of the conformal coating process for Sandia satellite programs based on information gathered. In the process of collecting information to perform the assessment, it was necessary to obtain a comprehensive understanding of the entire satellite box assembly process. A production time-line was constructed and is presented in the second section of this report, titled 'Satellite Box Assembly', specifically to identify potential sources of time delays, manufacturing issues, and component failures related to the conformal coating process in relation to the box assembly. The time-line also allows for identification of production issues that were anecdotally attributed to the conformal coating but actually were associated with other production steps in the box assembly process. It was constructed largely in consultation with GPS program engineers with empirical knowledge of times required

  12. Global Seismic Hazard Assessment Program Maps Are Misleading

    Science.gov (United States)

    Kossobokov, V. G.; Nekrasova, A. K.

    2010-12-01

    Losses from natural disasters continue to increase mainly due to poor understanding by majority of scientific community, decision makers and people, the three components of Risk, i.e., Hazard, Exposure, and Vulnerability. Contemporary Science is responsible for not coping with challenging changes of Exposures and their Vulnerability inflicted by growing population, its concentration, etc., which result in a steady increase of Losses from Natural Hazards. Scientists owe to Society for lack of knowledge, education, and communication. The Global Seismic Hazard Assessment Program (GSHAP) project was launched in 1992 by the International Lithosphere Program (ILP) with the support of the International Council of Scientific Unions (ICSU), and endorsed as a demonstration program in the framework of the United Nations International Decade for Natural Disaster Reduction (UN/IDNDR). The GSHAP project terminated in 1999 when the probabilistic seismic hazard assessment maps and digital data got published (e.g., URL www.seismo.ethz.ch/GSHAP/). The majority of recent disastrous earthquakes, like the 12 January 2010 Port-au-Prince (Haiti), the 12 May 2008 Wenchuan (Sichuan, China), …, the 26 January 2001 Bhuj (Gujarat, India) prove that the maps resulted from GSHAP are evidently misleading. We have performed a systematic comparison of the GSHAP peak ground acceleration (PGA) values with those related to strong earthquakes in 2000-2010. Each of the 1320 shallow magnitude 6 or larger earthquakes has from 4 to 9 values of the GSHAP PGA at the distance less than 12 km from its epicenter. When transforms to intensity are applied, e.g., MMI(M) = 1.5 (M - 1) (Gutenberg, Richter, 1954) and MMI(PGA) = 1.27 Ln(PGA) - 3.74 (Shteinberg et al. 1993), the difference between the observed and GSHAP estimates MMI(M) - MMI(PGA) is above 1.6 on average while its median equals 2.5. Moreover, for 51 out of 56 magnitude 7.5 or larger events in 2000-2010, the difference is above 1, while for 30 of

  13. An assessment of the Italian smart gas metering program

    International Nuclear Information System (INIS)

    The introduction of smart metering is one of the core elements in recent European policies targeting environmental sustainability and competitiveness of energy markets. Following the roll-out of smart electricity meters, in 2008 the Italian regulator designed an ambitious deployment program also for smart gas meters, that was recently modified in both scope and timing. This paper assesses Italy's original and current deployment plans, with a specific focus on the results of its cost–benefit analysis. In light of the evidence derived from the literature, we observe that the case for the roll-out of smart gas meters in Italy was not supported by a strong emphasis on energy savings but rather focused on increasing efficiency of the Italian gas market; in this respect, we argue that options other than smart gas metering should also be considered. Moreover the Italian cost–benefit analysis, which mostly dealt with the potential cost savings for distributors and suppliers, led to ambiguous results in terms of net present values; thus, we believe that an updated assessment would be extremely useful. Finally, in terms of technological choices, our analysis positively evaluates the regulator's recent proposal to consider a dual-fuel solution for the mass market deployment. - Highlights: • This paper assesses Italy's original and current deployment plans for smart gas meters. • The plan was not supported by a strong emphasis on energy savings. • A focus on increasing efficiency of the Italian gas market appears only partly justifiable. • The business case for adopting smart gas meters should be updated. • Our analysis positively evaluates the a dual-fuel solution for the mass market

  14. A qualitative investigation into the so-called ministry of deliverance

    Directory of Open Access Journals (Sweden)

    J. Janse van Rensburg

    2010-07-01

    Full Text Available Since the publication of the book“The occult debate” (Janse van Rensburg, 1999 it has become clear that epistemological views on occultism within the reformed tradition have drastically diverged. During the General Synod of the Dutch Reformed Church in 2007, the report of the Algemene Taakspan vir Leer en Aktuele Sake (ATLASon a ministry of deliverance denied the existence of the devil and claimed that it would be un-scientific to embark on an empirical research in this regard, because of the impossibility to verify information gathered in this manner. However, it is the hypothesis of this article that qualitative information could assist in attaining a clearer under-standing of the need for a ministry of deliverance. In this article the methodology of the qualitative research is explained and the narratives of participants are revealed. Thereafter the respon-ses of the participants are evaluated.

  15. OPTIMISE - Deliverable D4.3 Report on two axis rolling, month 12

    DEFF Research Database (Denmark)

    Eriksen, Morten

    This report is one of two reports which describe de deliverables on two axis rolling in the OPTIMISE project. Most of the work in this report has also been described in the sub work package reports produced during the project. The sub work package reports are WP4.1 Two axis rolling and WP4.3 Fini...... Element Modelling of two axis rolling....

  16. Privacy and Security Framework. OpenIoT Deliverable D522

    OpenAIRE

    Calbimonte, Jean-Paul; Riahi, Mehdi; Zaslavsky, Arkady

    2014-01-01

    This deliverable describes the Security and Privacy Framework of the OpenIoT platform, including details about its design and implementation. The aim of this framework is to ensure that Internet-Connected Objects (ICOs) contributing to the OpenIoT platform, its internal modules and external applications will communicate through secured IoT data interfaces (according to the target security/confidentiality level specified by the user). Moreover we show the feasibility of this security module ...

  17. Ensuring on-time quality data management deliverables from global clinical data management teams

    OpenAIRE

    Zia Haque

    2010-01-01

    The growing emphasis on off-site and off-shore clinical data management activities mandates a paramount need for adequate solutions geared toward on-time, quality deliverables. The author has been leading large teams that have been involved in successful global clinical data management endeavors. While each study scenario is unique and has to be approached as such, there are several elements in defining strategy and team structure in global clinical data management that can be applied univers...

  18. A Reflection of the Development, Activities and Deliverables of the Construction IT Alliance (CITA) In Ireland

    OpenAIRE

    Thomas, Ken; Hore, Alan V

    2003-01-01

    This paper reflects on the development, activities and deliverables of the Construction IT Alliance in the Republic of Ireland. This alliance was formed in 2001 with the vision of harnessing the potential of information and communication technologies in the Irish construction sector. CITA is a prime example of academia-industry-government collaboration in Ireland. A key driver in the development of CITA is the need to increase the extent of IT knowledge within the Irish construction sector. M...

  19. Deliverable D21.11 - Results of model tests on optimised configurations

    OpenAIRE

    Falchi, Massimo; Bugalsky, Tomasz Bugalsky; Di Felice, Fabio; Aloisio, Giovanni; Pereira, Francisco; Franchi, Stefano Ildebrando; Costanzo, Marcello; Pecoraro, Andrea; Salvatore, Francesco; Grizzi, Silvano; Nicolai, Claudia, Dr.

    2013-01-01

    Results of experimental work to evaluate design solutions aimed at improving the hydrodynamic performance of state-of-art screw propeller systems are presented. The report is written in fulfilment of the STREAMLINE Project Deliverable D21.11 `Results of model tests on optimised configurations.' The work documented herein is performed in the framework of Work Package 21, Task 21.6 in which propulsion efficiency enhancements deriving from the application of CFD- based design and numerical optim...

  20. PRESTOPRIME: Deliverable D3.1: Design and specification of the audiovisual preservation toolkit

    OpenAIRE

    Phillips, Stephen

    2010-01-01

    This deliverable is a specification and design document for an audiovisual content preservation environment. It contains a review of current digital preservation support for AV files, a survey of File-Corruption Detection methods and technologies, a review of threats to data integrity from use of large-scale data management environments; SLA schemas and QoS parameters for using online storage services in audiovisual preservation, the design of a system for preservation using both migration an...

  1. THE ASSESSMENT OF TARGETED PROGRAMS EFFECTIVENESS USING ECONOMIC – MATHEMATICAL METHODS

    Directory of Open Access Journals (Sweden)

    V. Gordiyenko

    2014-04-01

    Full Text Available The article under consideration deals with theoretical aspects of the application of program-target methods for budget programs formation. The main drawbacks of the current programs are shown. The efficiency of the Program for small businesses is assessed with economical mathematical methods. An effective mechanism for analyzing the effectiveness of the programs is provided. Reasonable ways of improving the system of programs formation are offered.

  2. Actinide partitioning-transmutation program final report. I. Overall assessment

    International Nuclear Information System (INIS)

    This report is concerned with an overall assessment of the feasibility of and incentives for partitioning (recovering) long-lived nuclides from fuel reprocessing and fuel refabrication plant radioactive wastes and transmuting them to shorter-lived or stable nuclides by neutron irradiation. The principal class of nuclides considered is the actinides, although a brief analysis is given of the partitioning and transmutation (P-T) of 99Tc and 129I. The results obtained in this program permit us to make a comparison of the impacts of waste management with and without actinide recovery and transmutation. Three major conclusions concerning technical feasibility can be drawn from the assessment: (1) actinide P-T is feasible, subject to the acceptability of fuels containing recycle actinides; (2) technetium P-T is feasible if satisfactory partitioning processes can be developed and satisfactory fuels identified (no studies have been made in this area); and (3) iodine P-T is marginally feasible at best because of the low transmutation rates, the high volatility, and the corrosiveness of iodine and iodine compounds. It was concluded on the basis of a very conservative repository risk analysis that there are no safety or cost incentives for actinide P-T. In fact, if nonradiological risks are included, the short-term risks of P-T exceed the long-term benefits integrated over a period of 1 million years. Incentives for technetium and iodine P-T exist only if extremely conservative long-term risk analyses are used. Further RD and D in support of P-T is not warranted

  3. Assessment of the Japanese Energy Efficiency Standards Program

    Directory of Open Access Journals (Sweden)

    Jun Arakawa

    2015-03-01

    Full Text Available Japanese energy efficiency standards program for appliances is a unique program which sets and revises mandatory standards based on the products of the highest energy efficiency on the markets. This study assessed the cost-effectiveness of the standard settings for air conditioner as a major residential appliance or typical example in the program. Based on analyses of empirical data, the net costs and effects from 1999 to 2040 were estimated. When applying a discount rate of 3%, the cost of abating CO2 emissions realized through the considered standards was estimated to be -13700 JPY/t-CO2. The sensitivity analysis, however, showed the cost turns into positive at a discount rate of 26% or higher. The authors also revealed that the standards’ “excellent” cost-effectiveness largely depends on that of the 1st standard setting, and the CO2 abatement cost through the 2nd standard was estimated to be as high as 26800 JPY/t-CO2. The results imply that the government is required to be careful about the possible economic burden imposed when considering introducing new, additional standards.

  4. MPH program adaptability in a competitive marketplace: the case for continued assessment.

    Science.gov (United States)

    Caron, Rosemary M; Tutko, Holly

    2010-06-01

    In the last several years, the number of Master of Public Health (MPH) programs has increased rapidly in the US. As such, MPH programs, particularly smaller-sized ones, need to critically examine how their programs are meeting the needs and preferences of local public health practitioners. To assist in this necessity, the University of New Hampshire conducted a comprehensive educational assessment of its effectiveness as a smaller-sized, accredited MPH program. The aim of the assessment was to review the MPH program from the perspective of all stakeholders and then to agree on changes that would contribute to the fulfillment of the program's mission, as well as improve program quality and reach. The program's stakeholders examined the following components: policy development and implementation; target audience; marketing strategies; marketplace position; delivery model; curriculum design; and continuing education. Though assessment activities explored a wide array of program attributes, target audience, curriculum design, and delivery strategy presented significant challenges and opportunities for our smaller MPH Program to remain competitive. The effort put forth into conducting an in-depth assessment of the core components of our program also allowed for a comparison to the increasing number of MPH programs developing regionally. Since public health practice is changing and the education of public health practitioners must be adaptable, we propose that a routine assessment of an institution's MPH program could not only meet this need but also assist with keeping smaller, unbranded MPH programs competitive in a burgeoning marketplace. PMID:20127157

  5. Report of the Department of Energy, Office of Environmental Management, Quality Assessment Program, inorganic intercomparison study

    International Nuclear Information System (INIS)

    This report presents results from the soil inorganic analysis of the 44th set of environmental quality assessment samples, of the quality assessment program, that were received on or before June 3, 1996. The samples were analyzed for RCRA metals

  6. Bioclim Deliverable D4/5: global climatic characteristics, including vegetation and seasonal cycles over Europe, for snapshots over the next 200,000 years

    International Nuclear Information System (INIS)

    The aim of the BIOCLIM project is to develop and present techniques that can be used to develop self-consistent patterns of possible future climate changes over the next million years (climate scenarios), and to demonstrate how these climate scenarios can be used in assessments of the long-term safety of nuclear waste repository sites. Within the project, two strategies are implemented to predict climate change. The first is the hierarchical strategy, in which a hierarchy of climate models is used to investigate the evolution of climate over the period of interest. These models vary from very simple 2-D and threshold models, which simulate interactions between only a few aspects of the earth system, through general circulation models (GCMs) and vegetation models, which simulate in great detail the dynamics and physics of the atmosphere, ocean, and biosphere, to regional models, which focus in particular on the European region and the specific areas of interest. The second strategy is the integrated strategy, in which intermediate complexity climate models are developed, and used to consecutively simulate the development of the earth system over many millennia. Although these models are relatively simple compared to a GCM, they are more advanced than 2D models, and do include physical descriptions of the biosphere, cryo-sphere, atmosphere and ocean. This deliverable, D4/5, focuses on the hierarchical strategy, and in particular the GCM and vegetation model simulation of possible future climates. Deliverable D3 documented the first step in this strategy. The Louvain-la-Neuve 2-D climate model (LLN-2D) was used to estimate (among other variables) annual mean temperatures and ice volume in the Northern Hemisphere over the next 1 million years. It was driven by the calculated evolution of orbital parameters, and plausible scenarios of CO2 concentration. From the results, 3 future time periods within the next 200,000 years were identified as being extreme, that is either

  7. The Building Block Simulation Approach to Program Assessment: The Case of Agriculture Canada's Meat Hygiene Program, 1970-1984

    OpenAIRE

    Brinkman, George L.

    2003-01-01

    For many decades a major emphasis in public policy has been the assurance of food safety and security. Measurement of the economic returns to these programs is often difficult and challenging. In many cases the difficulty in obtaining data and the sheer complexity of the issues make the use of traditional econometric and programming approaches impractical for assessing these activities. This paper presents a summary of an innovative method for measuring benefits and costs of hard-to-assess pr...

  8. Hanford Site's Integrated Risk Assessment Program: No-intervention risk assessment

    International Nuclear Information System (INIS)

    The long-term goal of the Integrated Risk Assessment program (IRAP) is to estimate risks to workers, the public, organizations, and groups with reserved rights to Site access, the ecosystem, and natural resources to aid in managing environmental restoration and waste management at the Hanford Site. For each of these, information is needed about current risks, risks during cleanup, and endstate risks. The objective is three-fold: to determine if and when to remediate, and to what extent; to identify information unavailable but needed to make better cleanup decisions; to establish technology performance criteria for achieving desired cleanup levels; to understand costs and benefits of activities from a Site-wide perspective. The no-intervention risk, assessment is the initial evaluation of public health risks conducted under IRAP. The objective is to identify types of activities that the US Department of Energy (DOE) must accomplish for closure of the Hanford Site, defined as no further DOE intervention. There are two primary conclusions from the no-intervention risk assessment. First, some maintenance and operations activities at Hanford must be continued to protect the public from grave risks. However, when large Hanford expenditures are compared to cleanup progress, funds expended for maintenance and operations must be put in proper perspective. Second, stakeholder's emphasis on public risks at Hanford, as indicated by remediation priorities, are not in line with those estimated. The focus currently is on compliance with regulations, and on dealing with issues which are visible to stakeholders

  9. Database creation, data quality assessment, and geochemical maps (phase V, deliverable 59)—Final report on compilation and validation of geochemical data: Chapter D in Second projet de renforcement institutionnel du secteur minier de la République Islamique de Mauritanie (PRISM-II)

    Science.gov (United States)

    Eppinger, Robert G.; Giles, Stuart A.; Lee, Gregory K.; Smith, Steven M.

    2015-01-01

    Under the World Bank-funded Second Projet de Renforcement Institutionnel du Secteur Minier de la Republique Islamique de Mauritanie (PRISM-II), this Phase V geochemistry report follows earlier Phase I and Phase II summary reports on geochemical data (U.S. Geological Survey, 2007 and Eppinger, 2007; respectively). All the reports are based on evaluations of geochemical data collected in 1999-2004 under an earlier World Bank program (PRISM-I) by the British Geological Survey (BGS) and the Bureau de Recherches Géologiques et Minières (BRGM) for the Government of Mauritania. There are no associated Phase III or IV reports.

  10. An Assessment of a First-Year Leadership Program

    OpenAIRE

    Havlik, Mary Kate

    2006-01-01

    Leadership development programs provide many positive outcomes for college students (Cress, Astin, Zimmerman-Oster, & Burkhardt, 2001; Striffolino & Saunders, 1989; Zimmerman-Oster & Burkardt, 1999). Leadership programs aid students in their academic achievement (Striffolino & Saunders, 1989), and leadership skills (Zimmerman-Oster & Burkardt, 1999). A specific type of leadership development programs are first-year leadership programs, or FYLPs. With similar goals as general leadersh...

  11. Portrait of a Work-Study Program Assessment

    Science.gov (United States)

    Ghant, Walter A.; Horst, S. Jeanne; Whetstone, Devon H.

    2016-01-01

    Institutions of higher education invest time and money directing cocurricular programs that allow students to formally engage in the local community. Community-service learning is one type of program recently dubbed "high impact" (Kuh, 2008). However, it is not enough to simply refer to a program as "high impact": it is…

  12. The Accelerated Doctor of Optometry Program: Outcomes Assessment.

    Science.gov (United States)

    Chauncey, Depeuw M.

    1999-01-01

    A survey of 101 graduates of the New England College of Optometry's (Massachusetts) accelerated doctoral program through 1995 and 141 graduates of the four-year program in 1990-95 illustrate the accelerated program's success in terms of graduate involvement in optometric education, medical education, and/or research, professional leadership,…

  13. Implementation Benchmarks for Assessing an Alternative Certification Program

    Science.gov (United States)

    Denton, Jon; Davis, Trina; Smith, Ben; Beason, Lynn; Graham, Diane, Strader, Arlen

    2008-01-01

    The Accelerate Online/OPTIONS alternative certification program provides those possessing a degree an option leading to certification that can be completed in 18 months. The program consists of an online curriculum, an early field experience and a year-long paid internship. To determine program effectiveness across five years, five benchmark…

  14. Assessment for Effective Intervention: Enrichment Science Academic Program

    Science.gov (United States)

    Sasson, Irit; Cohen, Donita

    2012-11-01

    Israel suffers from a growing problem of socio-economic gaps between those who live in the center of the country and residents of outlying areas. As a result, there is a low level of accessibility to higher education among the peripheral population. The goal of the Sidney Warren Science Education Center for Youth at Tel-Hai College is to strengthen the potential of middle and high school students and encourage them to pursue higher education, with an emphasis on majoring in science and technology. This study investigated the implementation and evaluation of the enrichment science academic program, as an example of informal learning environment, with an emphasis on physics studies. About 500 students conducted feedback survey after participating in science activities in four domains: biology, chemistry, physics, and computer science. Results indicated high level of satisfaction among the students. No differences were found with respect to gender excluding in physics with a positive attitudes advantage among boys. In order to get a deeper understanding of this finding, about 70 additional students conducted special questionnaires, both 1 week before the physics enrichment day and at the end of that day. Questionnaires were intended to assess both their attitudes toward physics and their knowledge and conceptions of the physical concept "pressure." We found that the activity moderately improved boys' attitudes toward physics, but that girls displayed decreased interest in and lower self-efficacy toward physics. Research results were used to the improvement of the instructional design of the physics activity demonstrating internal evaluation process for effective intervention.

  15. Assessment and Treatment of Co-occurring Eating Disorders in Privately Funded Addiction Treatment Programs

    OpenAIRE

    Killeen, Therese K.; Greenfield, Shelly F.; Bride, Brian E.; Cohen, Lisa; Gordon, Susan Merle; Roman, Paul M

    2011-01-01

    Privately-funded addiction treatment programs were surveyed to increase understanding of assessment and current treatment options for patients with co-occurring substance use and eating disorders. Data were collected from face-to-face interviews with program administrators of a nationally representative sample of 345 private addiction treatment programs. Although the majority of programs reported screening for eating disorders, programs varied in screening instruments used. Sixty-seven percen...

  16. Bringing Science to Bear: An Empirical Assessment of the Comprehensive Soldier Fitness Program

    Science.gov (United States)

    Lester, Paul B.; McBride, Sharon; Bliese, Paul D.; Adler, Amy B.

    2011-01-01

    This article outlines the U.S. Army's effort to empirically validate and assess the Comprehensive Soldier Fitness (CSF) program. The empirical assessment includes four major components. First, the CSF scientific staff is currently conducting a longitudinal study to determine if the Master Resilience Training program and the Comprehensive…

  17. 75 FR 18171 - Overview Information; Race to the Top Fund Assessment Program; Notice Inviting Applications for...

    Science.gov (United States)

    2010-04-09

    ... the world leader in college graduates. Through the Race to the Top Fund Assessment Program, the... public provided input in response to questions, published in the Federal Register (see 74 FR 54795-54800... Overview Information; Race to the Top Fund Assessment Program; Notice Inviting Applications for New...

  18. 20 CFR 658.604 - Assessment and evaluation of program performance data.

    Science.gov (United States)

    2010-04-01

    ... Agency Compliance With Job Service Regulations § 658.604 Assessment and evaluation of program performance... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Assessment and evaluation of program performance data. 658.604 Section 658.604 Employees' Benefits EMPLOYMENT AND TRAINING...

  19. Framework for an Effective Assessment and Accountability Program: The Philadelphia Example

    Science.gov (United States)

    Porter, Andrew C.; Chester, Mitchell D.; Schlesinger, Michael D.

    2004-01-01

    The purpose of this article is to put in the hands of researchers, practitioners, and policy makers a powerful framework for building and studying the effects of high-quality assessment and accountability programs. The framework is illustrated through a description and analysis of the assessment and accountability program in the School District of…

  20. 76 FR 71934 - Tobacco Transition Payment Program; Availability of Current Assessment Methods Determination...

    Science.gov (United States)

    2011-11-21

    ... addresses the rulemaking matter covered in a Federal Register document published March 22, 2011 (76 FR 15859... Farm Service Agency Tobacco Transition Payment Program; Availability of Current Assessment Methods... and importer assessments that fund the Tobacco Transition Payment Program (TTPP). It is in response...

  1. Customized versus Standardized Exams for Learning Outcomes Assessment in an Undergraduate Business Program

    Science.gov (United States)

    Phelps, Amy L.; Spangler, William E.

    2013-01-01

    A standardized exam for program-level assessment can take the form of 1) a customized exam developed in-house by faculty and linked explicitly to program-level learning goals; or 2) a standardized exam developed externally by assessment experts and linked to a set of somewhat broader and more generalizable learning goals. This article discusses…

  2. The Socioeconomic Assessment of Sloping Land Conversion Program in China

    DEFF Research Database (Denmark)

    Liu, Zhen

    Abstract This thesis mainly focuses on the socioeconomic impact of the largest Ecological Recovery Program ― the Sloping Land Conversion Program (SLCP), also called Grain for Green Program (GFG) in China. The central government initiated this program in 1999 and it was launched nationwide in 2002...... amount of household survey data, this study aims to improve our understanding of the treatment effect of the SLCP on farm households, which is split into three parts. The first paper ― The Sloping Land Conversion Program in China: Effects on Rural Households’ Livelihood Diversification, evaluates the...... effects of the implementation of the Sloping Land Conversion Program (SLCP) on livelihood diversification, which is thought to be the solution to poverty and environmental dilemmas. Our results show that SLCP works as a valid external policy intervention on rural livelihood diversification. In addition...

  3. Self-management and Optimization Framework. OpenIoT Deliverable D512

    OpenAIRE

    Calbimonte, Jean-Paul; Riahi, Mehdi; Gwadera, Robert; Guo, Tian; Podnar Zarko, Ivana; Georgoulis, Chris

    2013-01-01

    This deliverable describes the OpenIoT self-management and optimization framework, in terms of algorithms and mechanisms that it comprises as well as in terms of their implementation over the OpenIoT platform and associated cloud infrastructure. As a first step the main operations and functionalities of the OpenIoT self-management and optimization infrastructure are described and related to the structure of management operations defined in state-of-the-art frameworks for autonomic computing a...

  4. Ensuring on-time quality data management deliverables from global clinical data management teams

    Directory of Open Access Journals (Sweden)

    Zia Haque

    2010-01-01

    Full Text Available The growing emphasis on off-site and off-shore clinical data management activities mandates a paramount need for adequate solutions geared toward on-time, quality deliverables. The author has been leading large teams that have been involved in successful global clinical data management endeavors. While each study scenario is unique and has to be approached as such, there are several elements in defining strategy and team structure in global clinical data management that can be applied universally. In this article, key roles, practices, and high-level procedures are laid out as a road map to ensure success with the model.

  5. Sociotechnical Systems Approach: An Internal Assessment of a Blended Doctoral Program

    Science.gov (United States)

    Erichsen, Elizabeth Anne; DeLorme, Lyn; Connelley, Rosalinda; Okurut-Ibore, Christine; McNamara, Lisa; Aljohani, Obaidalah

    2013-01-01

    An internal assessment was conducted utilizing a sociotechnical systems approach and cultural lens as a means of exploring the dynamics of a blended doctoral program. Blended learning environments were conceived of as sociotechnical systems, and blended programs were defined as programs that utilize multimodal means for the mediation of…

  6. Using Benefit-Cost Analysis to Assess Child Abuse Prevention and Intervention Programs.

    Science.gov (United States)

    Plotnick, Robert D.; Deppman, Laurie

    1999-01-01

    Presents a case for using benefit-cost analysis to structure evaluations of child-abuse prevention and intervention programs. Presents the basic concept of benefit-cost analysis, its application in the context of assessing these types of child welfare programs, and limitations on its application to social service programs. (Author)

  7. Implementation of Portfolio Assessment in a Competency-based Dental Hygiene Program.

    Science.gov (United States)

    Gadbury-Amyot, Cynthia C.; Holt, Lorie P.; Overman, Pamela R.; Schmidt, Colleen R.

    2000-01-01

    Describes the implementation of a portfolio assessment program in the dental hygiene program at the University of Missouri School of Dentistry. Tables provide examples of program competencies and related portfolio entries, the complete scoring rubric for portfolios, and the student portfolio evaluation survey. Concludes that although portfolio…

  8. 42 CFR 482.21 - Condition of participation: Quality assessment and performance improvement program.

    Science.gov (United States)

    2010-10-01

    ... processes of care, hospital service and operations. (b) Standard: Program data. (1) The program must... FOR HOSPITALS Basic Hospital Functions § 482.21 Condition of participation: Quality assessment and performance improvement program. The hospital must develop, implement, and maintain an effective,...

  9. Safety Culture Perceptions in a Collegiate Aviation Program: A Systematic Assessment

    OpenAIRE

    Adjekum, Daniel Kwasi

    2014-01-01

    An assessment of the perceptions of respondents on the safety culture at an accredited Part 141 four year collegiate aviation program was conducted as part of the implementation of a safety management system (SMS). The Collegiate Aviation Program Safety Culture Assessment Survey (CAPSCAS), which was modified and revalidated from the existing Commercial Aviation Safety Survey (CASS), was used. Participants were drawn from flight students and certified flight instructors in the program. The sur...

  10. Laboratory Directed Research and Development Program Assessment for FY 2014

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, D. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2014-03-01

    Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report fulfills that requirement.

  11. Assessment Study of an Undergraduate Research Training Abroad Program

    Science.gov (United States)

    Nieto-Fernandez, Fernando; Race, Kathryn; Quarless, Duncan A.

    2013-01-01

    The Old Westbury Neuroscience International Research Program (OWNIP) encourages undergraduate students from health disparities populations and underrepresented minorities to pursue careers in basic science, biomedical, clinical, and behavioral health research fields. To evaluate this program, several measures were used tracked through an online…

  12. Program for Exceptional Children; Handbook--Educational and Psychological Assessment.

    Science.gov (United States)

    Georgia State Dept. of Education, Atlanta. Div. of Special Education.

    The handbook is presented as a method for evaluating individual exceptional children and selecting the best program for their needs. Discussed are the responsibilities of state and local programs, methods of selection, local referral systems, arrangements for testing on the state and local level, procedures to be used by evaluators and the local…

  13. Improving Outcome Assessment in Information Technology Program Accreditation

    Science.gov (United States)

    Goda, Bryan S.; Reynolds, Charles

    2010-01-01

    As of March 2010, there were fourteen Information Technology programs accredited by the Accreditation Board for Engineering and Technology, known as ABET, Inc (ABET Inc. 2009). ABET Inc. is the only recognized institution for the accreditation of engineering, computing, and technology programs in the U.S. There are currently over 128 U.S. schools…

  14. Comparative study for environmental assessment by program characters

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Suk Chul; Lee, Young Soo; Park, Young Min; Park, Suk Soon; Chung, Kyung Tae; Cho, Hong Yun; Chae, Jang Won; Lee, Sang Don; Lee, Chan Ho; Choi, Joon Kyu; Kim, Kang Joo; Chung, Won Moo; Jin, Jae Yool [Korea Environment Institute, Seoul (Korea)

    1998-12-01

    The level of environmental assessment in Korea was diagnosed by examining the situation of its model for the entire environmental assessment implemented. Also, it proposed an improvement scheme for its problems to be able to advance. It is expected to be utilized as developing optimum model for Korea and establishing a systematic and concrete guideline for environmental assessment modeling. 244 refs., 65 figs., 28 tabs.

  15. Analytical Assessment of the Reciprocating Feed System

    Science.gov (United States)

    Eddleman, David E.; Blackmon, James B.; Morton, Christopher D.

    2006-01-01

    A preliminary analysis tool has been created in Microsoft Excel to determine deliverable payload mass, total system mass, and performance of spacecraft systems using various types of propellant feed systems. These mass estimates are conducted by inserting into the user interface the basic mission parameters (e.g., thrust, burn time, specific impulse, mixture ratio, etc.), system architecture (e.g., propulsion system type and characteristics, propellants, pressurization system type, etc.), and design properties (e.g., material properties, safety factors, etc.). Different propellant feed and pressurization systems are available for comparison in the program. This gives the user the ability to compare conventional pressure fed, reciprocating feed system (RFS), autogenous pressurization thrust augmentation (APTA RFS), and turbopump systems with the deliverable payload, inert mass, and total system mass being the primary comparison metrics. Analyses of several types of missions and spacecraft were conducted and it was found that the RFS offers a performance improvement, especially in terms of delivered payload, over conventional pressure fed systems. Furthermore, it is competitive with a turbopump system at low to moderate chamber pressures, up to approximately 1,500 psi. Various example cases estimating the system mass and deliverable payload of several types of spacecraft are presented that illustrate the potential system performance advantages of the RFS. In addition, a reliability assessment of the RFS was conducted, comparing it to simplified conventional pressure fed and turbopump systems, based on MIL-STD 756B; these results showed that the RFS offers higher reliability, and thus substantially longer periods between system refurbishment, than turbopump systems, and is competitive with conventional pressure fed systems. This is primarily the result of the intrinsic RFS fail-operational capability with three run tanks, since the system can operate with just two run

  16. 45 CFR 284.30 - What information must the State include in its assessment of the impact of the TANF program(s) in...

    Science.gov (United States)

    2010-10-01

    ... assessment of the impact of the TANF program(s) in the State on the increase in child poverty? 284.30 Section... FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF THE... TANF program(s) in the State on the increase in child poverty? (a) The State's assessment must:...

  17. Program director and resident perspectives of a competency-based medical education anesthesia residency program in Canada: a needs assessment

    Science.gov (United States)

    2016-01-01

    Purpose: In July 2015, the University of Ottawa introduced a competency-based medical education (CBME) postgraduate program for anesthesia. Prior to program implementation, this study aimed to identify Canadian anesthesiology program directors perceptions of CBME and residents’ opinion on how the program should be designed and perceived consequences of CBME. Methods: This two-phase, qualitative study included semi-structured interviews with Canadian anesthesia program directors (Phase I) and a focus group interview with residents enrolled in the University of Ottawa time-based anesthesia program (Phase II). Both phases sought to gauge participant’s perceptions of CBME. Interviews were recorded, transcribed verbatim and thematically analyzed. Results: Data was combined to protect anonymity of the six participants (three program directors and three residents). Participants spoke about the perceived advantages of CBME, the need to establish definitions, and challenges to a CBME program highlighting logistical factors, implications for trainees and the role assessment plays in CBME. Conclusion: These findings will inform CBME implementation strategies in anesthesia programs across the country, and may assist other residency programs in the design of their programs. Furthermore, our findings may help identify potential challenges and issues that other postgraduate specialties may face as they transition to a CBME model. PMID:26913772

  18. Improving Program Design and Assessment with Broadening Participation Resources

    Science.gov (United States)

    Siegfried, D.; Johnson, A.; Thomas, S. H.; Fauver, A.; Detrick, L.

    2012-12-01

    Many theoretical and research-based approaches suggest how to best use mentoring to enhance an undergraduate research program. The Institute for Broadening Participation's Pathways to Engineering and Pathways to Ocean Sciences projects synthesized a set of mentoring studies, theoretical sources, and other texts pertinent to undergraduate research program design into a suite of practical tools that includes an online mentoring manual, an online reference library of mentoring and diversity literature, and practical guides such as Using Social Media to Build Diversity in Your REU. The overall goal is to provide easy-to-access resources that can assist faculty and program directors in implementing or honing the mentoring elements in their research programs for undergraduates. IBP's Online Mentoring Manual addresses common themes, such as modeling, student self-efficacy, career development, retention and evaluation. The Online Diversity Reference Library provides a comprehensive, annotated selection of key policy documents, research studies, intervention studies, and other texts on broadening participation in science, technology, engineering and mathematics. IBP's suite of tools provides the theoretical underpinnings and research findings that can help leaders in education integrate site-appropriate mentoring elements into their educational programs. Program directors and faculty from a variety of program types and disciplines have benefitted from using the Manual and other resources. IBP continues the work of translating and synthesizing theory to practice and welcomes your participation and partnership in that effort.

  19. Industrial Fuel Gas Demonstration Plant Program. Bid packages for materials (Deliverable No. 28)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Fixed-price supply type bid packages for materials and/or service essentially are comprised of two parts, namely: (1) a technical requisition of the material, equipment, or service to be supplied; and (2) commercial and legal requirements, normally referred to as terms and conditions. Requisitions, providing technical requirements, for all equipment items identified for the Industrial Fuel Gas Demonstration Plant may be found in the 12 volumes of the Demonstration Plant Mechanical Design. The requisitions have been included within separate sections of the design report, sorted by appropriate plant unit. Combined with any General Notes Requisition and the necessary FWEC Job Standards, these various item requisitions provide all technical information for the prospective vendor to furnish his bid. The terms and conditions (boiler plate) to be included in the bid package identify all the contractual requirements which will be imposed upon the bidder. These requirements cover the conditions he must meet to bid on the particular item as well as the clauses to be included within the eventual purchase order/subcontract. A typical package of such terms and conditions is included.

  20. Industrial Fuel Gas Demonstration Plant Program. Volume 1. Demonstration plant environmental analysis (Deliverable No. 27)

    Energy Technology Data Exchange (ETDEWEB)

    Gray, Robert W.; Swift, Richard J.; Krause, Arthur J.; Berkey, Edgar

    1979-08-01

    This environmental report describes the proposed action to construct, test and operate a coal gasification demonstration plant in Memphis, Tennessee, under the co-sponsorship of the Memphis Light, Gas and Water Division (MLGW) and the US Department of Energy (DOE). This document is Volume I of a three-volume Environmental Report. Volume I consists of the Summary, Introduction and the Description of the Proposed Action. Volume II consists of the Description of the Existing Environment. Volume III contains the Environmental Impacts of the Proposed Action, Mitigating Measures and Alternatives to the Proposed Action.

  1. New Mexico Statewide Assessment Program (NMSAP) Procedures Manual, 2007-2008

    Science.gov (United States)

    New Mexico Public Education Department, 2007

    2007-01-01

    This manual has been prepared for all New Mexico Statewide Assessment Program (NMSAP) assessment administrators, teachers, school specialists, and principals. It includes information about the following topics: PED contacts, New Mexico Standards Based Assessments (SBA), Grades 3-8 and 11; New Mexico High School Competency Examination (NMHSCE);…

  2. Financial Sector Assessment Program : Malaysia - Core Principles for Effective Deposit Insurance Systems

    OpenAIRE

    International Monetary Fund; World Bank

    2013-01-01

    This assessment of compliance with the Core Principles for Effective Deposit Insurance Systems (Core Principles) was conducted as a part of the Financial Sector Assessment Program (FSAP) performed by the International Monetary Fund and the World Bank at the request of the Malaysian government. This assessment was conducted by Claire McGuire, Senior Financial Sector Specialist with the Worl...

  3. What Assessment Knowledge and Skills Do Initial Teacher Education Programs Address? A Western Canadian Perspective

    Science.gov (United States)

    Poth, Cheryl-Anne

    2012-01-01

    Teacher education programs play a crucial role in preparing teachers for their future assessment roles and responsibilities, yet many beginning teachers feel unprepared to assess their students' performances (Mertler, 2009). To address concerns related to the relevancy of pre-service assessment education, this study examined 57 syllabi from…

  4. 76 FR 55673 - Vulnerability Assessments in Support of the Climate Ready Estuaries Program: A Novel Approach...

    Science.gov (United States)

    2011-09-08

    ... AGENCY Vulnerability Assessments in Support of the Climate Ready Estuaries Program: A Novel Approach... period for the draft documents titled, Vulnerability Assessments in Support of the Climate Ready... Partnership (EPA/600/R-11/ 058a) and Vulnerability Assessments in Support of the Climate Ready...

  5. Assessment of Programming Language Learning Based on Peer Code Review Model: Implementation and Experience Report

    Science.gov (United States)

    Wang, Yanqing; Li, Hang; Feng, Yuqiang; Jiang, Yu; Liu, Ying

    2012-01-01

    The traditional assessment approach, in which one single written examination counts toward a student's total score, no longer meets new demands of programming language education. Based on a peer code review process model, we developed an online assessment system called "EduPCR" and used a novel approach to assess the learning of computer…

  6. Assessment of Selected Aspects of Teaching Programming in SK and CZ

    Science.gov (United States)

    Záhorec, Jan; Hašková, Alena; Munk, Michal

    2014-01-01

    Authors of this paper carried out a broader international research aimed at assessing the computer science education at upper secondary level of education--ISCED 3A. The assessed school subjects were informatics and programming as the most common school subjects taught at secondary schools within computer sciences. The assessment was based on the…

  7. Online Collaboration for Programming: Assessing Students' Cognitive Abilities

    Science.gov (United States)

    Othman, Mahfudzah; Muhd Zain, Nurzaid

    2015-01-01

    This study is primarily focused on assessing the students' logical thinking and cognitive levels in an online collaborative environment. The aim is to investigate whether the online collaboration has significant impact to the students' cognitive abilities. The assessment of the logical thinking involved the use of the online Group Assessment…

  8. National Assessment Program--Science Literacy Year 6 Report, 2006

    Science.gov (United States)

    Donovan, Jenny; Lennon, Melissa; O'Connor, Gayl; Morrissey, Noni

    2008-01-01

    In 2003 the first nationally-comparable science assessment was designed, developed and carried out under the auspices of the national council of education ministers, the Ministerial Council on Education, Employment, Training and Youth Affairs (MCEETYA). In 2006 a second science assessment was conducted and, for the first time nationally, the…

  9. A Consultative Training Program: Collateral Effect of a Needs Assessment

    Science.gov (United States)

    Lucier, Kathleen H.

    2008-01-01

    This case study reveals a series of significant and effective changes that resulted from administering a needs assessment to managers working in a bank undergoing a major change in the organizational culture. The assessment changed not only the training objectives or the client organization, but also the training design. What originally began as a…

  10. Assessing Interdisciplinary Education in U.S. Dental Hygiene Programs.

    Science.gov (United States)

    Holt, Lorie; Bray, Kimberly; Mayberry, Bill; Overman, Pamela

    2000-01-01

    Survey responses from 136 of 216 dental hygiene programs indicated that 31% included interdisciplinary activities in the curriculum; only 15% included both clinical and instructional interdisciplinary coursework. However, 74% felt that students would benefit from interdisciplinary experiences. (SK)

  11. LANL12-RS-107J PYTHON Radiography Analysis Tool (PyRAT). Mid-Year Deliverable Report for FY15

    Energy Technology Data Exchange (ETDEWEB)

    Temple, Brian Allen [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Armstrong, Jerawan Chudoung [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-04-14

    This document is a mid-year report on a deliverable for the PYTHON Radiography Analysis Tool (PyRAT) for project LANL12-RS-107J in FY15. The deliverable is deliverable number 2 in the work package and is titled “Add the ability to read in more types of image file formats in PyRAT”. Right now PyRAT can only read in uncompressed TIF files (tiff files). It is planned to expand the file formats that can be read by PyRAT, making it easier to use in more situations. A summary of the file formats added include jpeg, jpg, png and formatted ASCII files.

  12. LANL12-RS-107J PYTHON Radiography Analysis Tool (PyRAT). Mid-Year Deliverable Report for FY15

    International Nuclear Information System (INIS)

    This document is a mid-year report on a deliverable for the PYTHON Radiography Analysis Tool (PyRAT) for project LANL12-RS-107J in FY15. The deliverable is deliverable number 2 in the work package and is titled ''Add the ability to read in more types of image file formats in PyRAT''. Right now PyRAT can only read in uncompressed TIF files (tiff files). It is planned to expand the file formats that can be read by PyRAT, making it easier to use in more situations. A summary of the file formats added include jpeg, jpg, png and formatted ASCII files.

  13. APOLLON. Multi-APprOach for high efficiency integrated and inteLLigent cONcentrating PV modules (Systems). Deliverable 7.10. Publication of environmental LCI dataset

    Energy Technology Data Exchange (ETDEWEB)

    Olson, C.L. [ECN Solar Energy, Petten (Netherlands)

    2013-10-15

    This deliverable makes available the life-cycle inventory used to calculate the energy payback time and the carbon footprint of the Apollon final concentrating photovoltaics (CPV) design developed.. The data below relates to one Apollon module. The results are to be published in Environmental Science and Technology, in a paper, 'Sustainability of Materials and Costs of Materials in a Mirror-based Concentrating Photovoltaic System'. Reference is made to the results for the Spectrolab triple junction solar cell in the following two studies: (1) 'Life cycle assessment of high-concentration photovoltaic systems' (Prog. Photovolt: Res. Appl., vol. 21, pp. 379-388, 2013), and (2) 'Life Cycle Analysis of Two New Concentrator PV Systems', in 23rd European Photovoltaic Solar Energy Conference, Valencia, Spain, 2008.

  14. Environmental hazards assessment program. Annual report, July 1, 1994--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-31

    This report describes activities and reports on progress for the third year of the DOE grant to support the Environmental Hazards Assessment Program (EHAP). It reports progress against grant objectives and the Program Implementation Plan published at the end of the first year of the grant. As the program has evolved, more projects have been funded and many existing projects have become more complex. Thus, to accomplish better the objectives over the years and retain a solid focus on the total mission, we have reorganized the grant effort from three to five majoe elements: Public and professional outreach; Clinical programs; Science programs; Information systems; and, Program management.

  15. Environmental hazards assessment program. Annual report, July 1, 1994--June 30, 1995

    International Nuclear Information System (INIS)

    This report describes activities and reports on progress for the third year of the DOE grant to support the Environmental Hazards Assessment Program (EHAP). It reports progress against grant objectives and the Program Implementation Plan published at the end of the first year of the grant. As the program has evolved, more projects have been funded and many existing projects have become more complex. Thus, to accomplish better the objectives over the years and retain a solid focus on the total mission, we have reorganized the grant effort from three to five majoe elements: Public and professional outreach; Clinical programs; Science programs; Information systems; and, Program management

  16. Supporting Students in C++ Programming Courses with Automatic Program Style Assessment

    Science.gov (United States)

    Ala-Mutka, Kirsti; Uimonen, Toni; Jarvinen, Hannu-Matti

    2004-01-01

    Professional programmers need common coding conventions to assure co-operation and a degree of quality of the software. Novice programmers, however, easily forget issues of programming style in their programming coursework. In particular with large classes, students may pass several courses without learning elements of programming style. This is…

  17. Nuclear proliferation and civilian nuclear power. Report of the Nonproliferation Alternative Systems Assessment Program. Volume I. Program summary

    International Nuclear Information System (INIS)

    This report summarizes the Nonproliferation Alternative Systems Assessment Program (NASAP): its background, its studies, and its results. The introductory chapter traces the growth of the issue of nuclear weapons proliferation and the organization and objectives of NASAP. Chapter 2 summarizes the program's assessments, findings, and recommendations. Each of Volumes II-VII reports on an individual assessment (Volumn II: Proliferation Resistance; Volume III: Resources and Fuel Cycle Facilities; Volume IV: Commercial Potential; Volume V: Economics and Systems Analysis; Volume VI: Safety and Environmental Considerations for Licensing; Volume VII: International Perspectives). Volume VIII (Advanced Concepts) presents a combined assessment of several less fully developed concepts, and Volume IX (Reactor and Fuel Cycle Descriptions) provides detailed descriptions of the reactor and fuel-cycle systems studied by NASAP

  18. Nuclear proliferation and civilian nuclear power: report of the Nonproliferation Alternative Systems Assessment Program. Volume 1. Program summary

    International Nuclear Information System (INIS)

    This report summarizes the Nonproliferation Alternative Systems Assessment Program (NASAP): its background, its studies, and its results. This introductory chapter traces the growth of the issue of nuclear weapons proliferation and the organization and objectives of NASAP. Chapter 2 summarizes the program's assessments, findings and recommendations. Each of Volumes II-VII reports on an individual assessment (Volume II: Proliferation Resistance; Volume III: Resources and Fuel Cycle Facilities; Volume IV: Commercial Potential; Volume V: Economics and Systems Analysis; Volume VI: Safety and Environmental Considerations for Licensing; Volume VII: International Perspectives). Volume VIII (Advanced Concepts) presents a combined assessment of several less fully developed concepts, and Volume IX (Reactor and Fuel Cycle Descriptions) provides detailed descriptions of the reactor and fuel-cycle systems studied by NASAP

  19. Nuclear proliferation and civilian nuclear power. Report of the Nonproliferation Alternative Systems Assessment Program. Volume I. Program summary

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    This report summarizes the Nonproliferation Alternative Systems Assessment Program (NASAP): its background, its studies, and its results. The introductory chapter traces the growth of the issue of nuclear weapons proliferation and the organization and objectives of NASAP. Chapter 2 summarizes the program's assessments, findings, and recommendations. Each of Volumes II-VII reports on an individual assessment (Volumn II: Proliferation Resistance; Volume III: Resources and Fuel Cycle Facilities; Volume IV: Commercial Potential; Volume V: Economics and Systems Analysis; Volume VI: Safety and Environmental Considerations for Licensing; Volume VII: International Perspectives). Volume VIII (Advanced Concepts) presents a combined assessment of several less fully developed concepts, and Volume IX (Reactor and Fuel Cycle Descriptions) provides detailed descriptions of the reactor and fuel-cycle systems studied by NASAP.

  20. Analysis of assessment tools used in engineering degree programs

    OpenAIRE

    Martínez Martínez, María del Rosario; Olmedo Torre, Noelia; Amante García, Beatriz; Farrerons Vidal, Óscar; Cadenato Matia, Ana María

    2014-01-01

    This work presents an analysis of the assessment tools used by professors at the Universitat Politécnica de Catalunya to assess the generic competencies introduced in the Bachelor’s Degrees in Engineering. In order to conduct this study, a survey was designed and administered anonymously to a sample of the professors most receptive to educational innovation at their own university. All total, 80 professors responded to this survey, of whom 26% turned out to be members of the un...

  1. Nicaragua's 2013 residential lighting program: Prospective assessment

    International Nuclear Information System (INIS)

    The Ministry of Energy and Mines of Nicaragua (MEM) is planning to launch in 2013 a massive replacement program of 2 million incandescent lamps with compact fluorescent lamps (CFLs). This paper explores the expected impacts on a 10 year basis (2013–2023) using cost/benefit analysis for consumers, utility and society. Market conditions for introduction of a 7 W LED in the residential sector were also analyzed. Three prospective scenarios were considered in order to estimate the impact of CFLs penetration. Finally, the analysis is complemented with laboratory tests for eight lamps—three CFLs of the pilot program batch and one incandescent lamp 75 W; three CFLs and a 7 W LED available in the national market. Results supports that for countries like Nicaragua with an energy matrix still dependent on imported petroleum, energy efficiency programs are especially positive in economic and environmental terms. However, it is necessary to implement and to test CFLs programs requirements about high power factor (PF≥0.9) and low total harmonic distortion (THD≤20%). - Highlights: • Retrofits proposed are cost-effective for all range of consumers. • Reductions in utility's net balances are expected. • We estimate reductions in electricity peak demand and emissions of CO2. • All the efficient lamps tested present low power factors (PFs≤0.6) and high total harmonic distortions (THDs≥117%)

  2. Student Loyalty Assessment with Online Master's Programs

    Science.gov (United States)

    Dehghan, Ali

    2012-01-01

    Relationship marketing is attracting, maintaining, and, in multi-service organizations, enhancing customer relationships. Educational programs and services, like those of businesses, depend highly on the repeated purchases of their loyal customers. The purpose of this descriptive research is to investigate the relationships between factors that…

  3. Assessment of a Professional Development Program on Adult Learning Theory

    Science.gov (United States)

    Malik, Melinda

    2016-01-01

    Librarians at colleges and universities invested in graduate education must understand and incorporate adult learning theories in their reference and instruction interactions with graduate students to more effectively support the students' learning. After participating in a professional development program about adult learning theory, librarians…

  4. The US Acid Rain Program: design, performance, and assessment

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1998-01-01

    The US Acid Rain Program (ARP) from 1990 allows 1,000 major electric utilities all over the US to trade SO2 permits. Historical emission rights have been grandfathered and the target level is 50% SO2 reduction. Market performance has been successfull with much trade activity and unexpectedly low...

  5. An Evaluability Assessment of the Toyota Families in Schools Program.

    Science.gov (United States)

    Quint, Janet

    The Toyota Families in Schools (TFS) Program is a new family literacy initiative that was developed by the National Center for Family Literacy (NCFL) with support from the Toyota Motor Corporation. TFS is based on a previous NCFL model calling for providing literacy activities to preschoolers and parents from low-income families. NCFL wanted to…

  6. Healthe Kids: An Assessment of Program Performance and Participation

    Science.gov (United States)

    Dean, Bonnie B.; Kindermann, Sylvia L.; Carson, Tabetha; Gavin, Jan; Frerking, Melissa; Bergren, Martha Dewey

    2014-01-01

    Many states in the United States have mandated school health screenings for early identification and referral to professional services for a set of health conditions. Healthe Kids, a community-based program, began offering school-based health screenings to Missouri elementary schools in March 2007. The purpose of the article is to provide a…

  7. Violence in Children's Television Programming: Assessing the Risks.

    Science.gov (United States)

    Wilson, Barbara J.; Smith, Stacy L.; Potter, W. James; Kunkel, Dale; Linz, Daniel; Colvin, Carolyn M.; Donnerstein, Edward

    2002-01-01

    Investigates the nature and extent of violence contained in television programming that targets children aged 12 and younger. Notes that the violence itself is just as likely to be glamorized in children's as in nonchildren's shows, but it is even more sanitized and more likely to be trivialized. Documents five subgenres of children's programming…

  8. Towards ABET accreditation for a SWE program: alternative student assessment techniques

    International Nuclear Information System (INIS)

    This paper describes assessment techniques utilized for assessing undergraduate students studying in a software engineering program. The purpose behind this work is to get the program accredited by the Accreditation Board of Engineering and Technology (ABET). Therefore, a number of applied direct and indirect assessment techniques are described. These techniques are implemented towards the end of the semester to assess the extent to which the student and course outcomes are satisfied. Consequently, results are obtained and analyzed and various learning issues are eventually identified. Finally, the paper provides suggestions for improvement in course delivery as well as learning mechanism. (author)

  9. Clinical skills assessment of procedural and advanced communication skills: performance expectations of residency program directors

    Directory of Open Access Journals (Sweden)

    Erik E. Langenau

    2012-07-01

    Full Text Available Background: High stakes medical licensing programs are planning to augment and adapt current examinations to be relevant for a two-decision point model for licensure: entry into supervised practice and entry into unsupervised practice. Therefore, identifying which skills should be assessed at each decision point is critical for informing examination development, and gathering input from residency program directors is important. Methods: Using data from previously developed surveys and expert panels, a web-delivered survey was distributed to 3,443 residency program directors. For each of the 28 procedural and 18 advanced communication skills, program directors were asked which clinical skills should be assessed, by whom, when, and how. Descriptive statistics were collected, and Intraclass Correlations (ICC were conducted to determine consistency across different specialties. Results: Among 347 respondents, program directors reported that all advanced communication and some procedural tasks are important to assess. The following procedures were considered ‘important’ or ‘extremely important’ to assess: sterile technique (93.8%, advanced cardiovascular life support (ACLS (91.1%, basic life support (BLS (90.0%, interpretation of electrocardiogram (89.4% and blood gas (88.7%. Program directors reported that most clinical skills should be assessed at the end of the first year of residency (or later and not before graduation from medical school. A minority were considered important to assess prior to the start of residency training: demonstration of respectfulness (64%, sterile technique (67.2%, BLS (68.9%, ACLS (65.9% and phlebotomy (63.5%. Discussion: Results from this study support that assessing procedural skills such as cardiac resuscitation, sterile technique, and phlebotomy would be amenable to assessment at the end of medical school, but most procedural and advanced communications skills would be amenable to assessment at the end of the

  10. EPA`s program for risk assessment guidelines: Quantification issues

    Energy Technology Data Exchange (ETDEWEB)

    Dourson, M.L. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31

    The quantitative procedures associated with noncancer risk assessment include reference dose (RfD), benchmark dose, and severity modeling. The RfD, which is part of the EPA risk assessment guidelines, is an estimation of a level that is likely to be without any health risk to sensitive individuals. The RfD requires two major judgments: the first is choice of a critical effect(s) and its No Observed Adverse Effect Level (NOAEL); the second judgment is choice of an uncertainty factor. This paper discusses major assumptions and limitations of the RfD model.

  11. [Environmental Hazards Assessment Program annual report, June 1992--June 1993

    International Nuclear Information System (INIS)

    The Medical University of South Carolina (MUSC) is conducting a survey of Risk Assessment and Risk Management. They are developing information on the existing level of risk associated with training and the perceived need for this training by both federal and private organizations. The purpose of the questionnaire is to determine the available training and the perception of the Risk Management process in the DOE. Of particular interest is the requirement for Risk Assessment/Management training in organizations that will be involved in the Decontamination and Decommissioning of DOE Facilities. The survey questions and instructions are included

  12. Tank waste remediation system retrieval and disposal mission readiness-to-proceed guidance and requirements to deliverables crosswalk

    International Nuclear Information System (INIS)

    In September 1996, the US Department of Energy, Richland Operations Office (RL) initiated the first of a two-phase program to remediate waste storage in tanks at the Hanford Site in Washington State. Initiating the first phase, RL signed contracts with two private companies who agreed to receive and vitrify a portion of the tank waste in a demonstration and to return the vitrified product and by-products to the Project Management Hanford Contract (PHMC) team for disposition. The first phase of the overall remediation effort is a demonstration of treatment concepts, and the second phase includes treatment of the remaining tank wastes. The demonstration phase, Phase 1 of the project, is further subdivided into two parts, A and B. During Phase 1A, the vitrification contractors are to establish the technical, operational, regulatory, business, and financial elements required to provide treatment services on a fixed unit price basis. Phase 1A deliverables will be evaluated by RL to determine whether it is in the best interest of the government to have one or more vitrification contractors proceed with Phase 1B, in which 6% to 13% of the tank waste would be treated in the demonstration. In addition, before RL can authorize proceeding with Phase 1B, the PHMC team must demonstrate its readiness to retrieve and deliver the waste to the private contractor(s) and to receive and dispose of the products and by-products returned from the treatment. The PHMC team has organized their plans for providing these vitrification-support services into the Retrieval and Disposal Mission within the Tank Waste Remediation System (TWRS) Project. Three RL core teams were established to assist in evaluating the PHMC team's readiness specifically in regard to three task areas: Waste feed delivery; Infrastructure and by-products delivery; and Immobilized products. The core teams each developed a set of criteria and plans to be used in evaluating the PHMC team's readiness to proceed (RTP)

  13. AFSC/NMML: Cetacean Assessment and Ecology Program Humpback Whale Catalog

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Since 1980, the Cetacean Assessment and Ecology Program of the National Marine Mammal Laboratory has been collecting photos of humpback whales (Megaptera...

  14. Chemical Exposure Assessment Program at Los Alamos National Laboratory: A risk based approach

    International Nuclear Information System (INIS)

    The University of California Contract And DOE Order 5480.10 require that Los Alamos National Laboratory (LANL) perform health hazard assessments/inventories of all employee workplaces. In response to this LANL has developed the Chemical Exposure Assessment Program. This program provides a systematic risk-based approach to anticipation, recognition, evaluation and control of chemical workplace exposures. Program implementation focuses resources on exposures with the highest risks for causing adverse health effects. Implementation guidance includes procedures for basic characterization, qualitative risk assessment, quantitative validation, and recommendations and reevaluation. Each component of the program is described. It is shown how a systematic method of assessment improves documentation, retrieval, and use of generated exposure information

  15. Grain Size Data from the NOAA Outer Continental Shelf Environmental Assessment Program (OCSEAP)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains grain size data from samples acquired under the NOAA Outer Continental Shelf Environmental Assessment Program (OCSEAP) from the Outer...

  16. Teaching and Assessing Systems-based Competency in Ophthalmology Residency Training Programs

    NARCIS (Netherlands)

    Lee, Andrew G.; Beaver, Hilary A.; Greenlee, Emily; Oetting, Thomas A.; Boldt, H. Culver; Olson, Richard; Abramoff, Michael; Carter, Keith

    2007-01-01

    The Accreditation Council for Graduate Medical Education (ACGME) has mandated that residency programs, including ophthalmology, teach and assess specific competencies, including systems-based learning. We review the pertinent literature on systems-based learning for ophthalmology and recommend speci

  17. Assessment of Selected Aspects of Teaching Programming in SK and CZ

    Directory of Open Access Journals (Sweden)

    Ján ZÁHOREC

    2014-04-01

    Full Text Available Authors of this paper carried out a broader international research aimed at assessing the computer science education at upper secondary level of education - ISCED 3A. The assessed school subjects were informatics and programming as the most common school subjects taught at secondary schools within computer sciences. The assessment was based on the students' evaluations, their points of view and opinions, what was a specific feature of the research. The paper presents main findings and results for the school subject programming obtained in Slovakia (SK and the Czech Republic (CZ. As a weakness of teaching programming in both countries inadequate quality of textbooks or a lack of appropriate textbooks in general was identified. As strength of the programming teaching in the Czech Republic attractiveness of the content of the school subject programming (its curriculum was identified and in Slovakia it was the clearness of teachers' presentations of teaching material.

  18. Quality Control Charts in Large-Scale Assessment Programs

    Science.gov (United States)

    Schafer, William D.; Coverdale, Bradley J.; Luxenberg, Harlan; Jin, Ying

    2011-01-01

    There are relatively few examples of quantitative approaches to quality control in educational assessment and accountability contexts. Among the several techniques that are used in other fields, Shewart charts have been found in a few instances to be applicable in educational settings. This paper describes Shewart charts and gives examples of how…

  19. Decommissioning and Decontamination Program: Battelle Plutonium Facility, Environmental assessment

    International Nuclear Information System (INIS)

    This assessment describes the decontamination of Battelle-Columbus Plutonium Facility and removal from the site of all material contamination which was associated with or produced by the Plutonium Facility. Useable uncontaminated material will be disposed of by procedures normally employed in scrap declaration and transfer. Contaminated waste will be transported to approved radioactive waste storage sites. 5 refs., 1 fig

  20. Disposal facility for spent nuclear fuel. Environmental impact assessment program

    International Nuclear Information System (INIS)

    The report presents the Environmental Impact Assessment (EIA) of the high level radioactive waste disposal in Finland. In EIA different alternatives concerning site selection, construction, operation and sealing of the disposal facility as well as waste transportation and encapsulation of the waste are considered

  1. EPa`s program for risk assessment guidelines: Exposure issues

    Energy Technology Data Exchange (ETDEWEB)

    Callahan, M.A. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31

    Three major issues to be dealt with over the next ten years in the exposure assessment field are: consistency in terminology, the impact of computer technology on the choice of data and modeling, and conceptual issues such as the use of time-weighted averages.

  2. Towards Liberal Education Assessment in Engineering and Technology Programs

    Science.gov (United States)

    Eppes, Tom A.; Milanovic, Ivana; Sweitzer, Fredrick

    2012-01-01

    Our regional accrediting body, New England Association of Schools and Colleges, requires outcome assessment of core liberal education outcomes. Because of this mandate, and our new mission at the University to prepare students with the knowledge, skills, and values necessary to thrive and be engaged in a pluralistic, complex world, we have…

  3. Dosimetric quality, accuracy, and deliverability of modulated radiotherapy treatments for spinal metastases.

    Science.gov (United States)

    Kairn, Tanya; Papworth, Daniel; Crowe, Scott B; Anderson, Jennifer; Christie, David R H

    2016-01-01

    Cancer often metastasizes to the vertebra, and such metastases can be treated successfully using simple, static posterior or opposed-pair radiation fields. However, in some cases, including when re-irradiation is required, spinal cord avoidance becomes necessary and more complex treatment plans must be used. This study evaluated 16 sample intensity-modulated radiation therapy (IMRT) and volumetric-modulated arc therapy (VMAT) treatment plans designed to treat 6 typical vertebral and paraspinal volumes using a standard prescription, with the aim of investigating the advantages and limitations of these treatment techniques and providing recommendations for their optimal use in vertebral treatments. Treatment plan quality and beam complexity metrics were evaluated using the Treatment And Dose Assessor (TADA) code. A portal-imaging-based quality assurance (QA) system was used to evaluate treatment delivery accuracy, and radiochromic film measurements were used to provide high-resolution verification of treatment plan dose accuracy, especially in the steep dose gradient regions between each vertebral target and spinal cord. All treatment modalities delivered approximately the same doses and the same levels of dose heterogeneity to each planning target volume (PTV), although the minimum PTV doses in the vertebral plans were substantially lower than the prescription, because of the requirement that the plans meet a strict constraint on the dose to the spinal cord and cord planning risk volume (PRV). All plans met required dose constraints on all organs at risk, and all measured PTV-cord dose gradients were steeper than planned. Beam complexity analysis suggested that the IMRT treatment plans were more deliverable (less complex, leading to greater QA success) than the VMAT treatment plans, although the IMRT plans also took more time to deliver. The accuracy and deliverability of VMAT treatment plans were found to be substantially increased by limiting the number of monitor

  4. [Environmental Hazards Assessment Program annual report, June 1992--June 1993

    International Nuclear Information System (INIS)

    The purpose of the summer undergraduate internship program for research in environmental studies is to provide an opportunity for well-qualified students to undertake an original research project as an apprentice to an active research scientist in basic environmental research. Ten students from throughout the midwestern and eastern areas of the country were accepted into the program. These students selected projects in the areas of marine sciences, biostatistics and epidemiology, and toxicology. The research experience for all these students and their mentors was very positive. The seminars were well attended and the students showed their interest in the presentations and environmental sciences as a whole by presenting the speakers with thoughtful and intuitive questions. This report contains the research project written presentations prepared by the student interns

  5. Lightweight Exoatmospheric Projectile (LEAP) test program. Supplemental environmental assessment

    Science.gov (United States)

    1992-06-01

    The proposed action is to modify previously planned Lightweight Exoatmospheric Projectile (LEAP) Test Program activities (LEAP EA, July 1991, Ref 32) at White Sands Missile Range (WSMR), New Mexico; Kwajalein Missile Range (KMR), U.S. Army Kwajalein Atoll (USAKA); and Wake Island. The proposed action includes modifications of flight trajectories for LEAP flights 3, 5, and 6. Two additional flights, LEAP-X and LEAP-7 have been added to the program. LEAP-X is a single rocket test flight from KMR and LEAP-7 is a two-rocket test flight from KMR and Wake Island. Component/assembly ground tests will take place at Orbital Sciences Corporation (OSC), Space Data Division (SDD), Chandler, Arizona; Phillips Laboratory, Edwards Air Force Base, California; Rocketdyne Division of Rockwell International; Boeing Aerospace and Electronics, Kent, Washington; Hughes Aircraft Corporation, Missile Systems Group, Canoga Park California; Aerojet, Sacramento, California; and Thiokol Corporation, Elkton, Maryland.

  6. Assessing the impacts of the JFK Ground Management Program

    OpenAIRE

    Stroiney, Steven; Levy, Benjamin; Khadilkar, Harshad Dilip; Balakrishnan, Hamsa

    2013-01-01

    The Ground Management Program at John F. Kennedy International Airport (JFK) aims to leverage the availability of comprehensive airport surface surveillance data and airline schedule information to better manage the taxi-out process, reduce taxi times, and improve efficiency. During periods when departure demand exceeds capacity, departing aircraft are held at the gate or another holding location, and released to the runway in time to join a short departure queue before taking off. As a resul...

  7. Assess program: Interactive data management systems for airborne research

    Science.gov (United States)

    Munoz, R. M.; Reller, J. O., Jr.

    1974-01-01

    Two data systems were developed for use in airborne research. Both have distributed intelligence and are programmed for interactive support among computers and with human operators. The C-141 system (ADAMS) performs flight planning and telescope control functions in addition to its primary role of data acquisition; the CV-990 system (ADDAS) performs data management functions in support of many research experiments operating concurrently. Each system is arranged for maximum reliability in the first priority function, precision data acquisition.

  8. Niger; Ex Post Assessment of Longer-Term Program Engagement

    OpenAIRE

    International Monetary Fund

    2011-01-01

    IMF engagement with Niger since 2005 has remained constructive. IMF-supported programs have contributed to the authorities’ goals of macroeconomic stability, growth, and human development progress. Development of Niger’s uranium and petroleum resources provides an important opportunity to raise the living standards of Niger’s citizens. Institutional reforms aimed at enhancing the efficient use of resource revenues and transparency of public finances will remain critical to maximize bene...

  9. Development of an Auto-Validation Program for MARS Code Assessments

    International Nuclear Information System (INIS)

    MARS (Multi-dimensional Analysis of Reactor Safety) code is a best-estimate thermal hydraulic system analysis code developed at KAERI. It is important for a thermal hydraulic computer code to be assessed against theoretical and experimental data to verify and validate the performance and the integrity of the structure, models and correlations of the code. The code assessment efforts for complex thermal hydraulics code such as MARS code can be tedious, time-consuming and require large amount of human intervention in data transfer to see the results in graphic forms. Code developers produce many versions of a code during development and each version need to be verified for integrity. Thus, for MARS code developers, it is desirable to have an automatic way of carrying out the code assessment calculations. In the present work, an Auto-Validation program that carries out the code assessment efforts has been developed. The program uses the user supplied configuration file (with '.vv' extension) which contain commands to read input file, to execute the user selected MARS program, and to generate result graphs. The program can be useful if a same set of code assessments is repeated with different versions of the code. The program is written with the Delphi program language. The program runs under the Microsoft Windows environment

  10. Development of the Office of Civilian Radioactive Waste Management's Self-Assessment Program

    International Nuclear Information System (INIS)

    This paper describes the development and implementation of the Self-Assessment (SA) Program of the Office of Civilian Radioactive Waste Management (RW). The basis for RW's SA Program is discussed, as well as RW's approach for meeting self-assessment requirements, RW's organization for self-assessment, actions to establish RW's SA Program, and planned RW SA implementation activities. This paper also discusses how self-assessment can support programmatic decisions and actions. The RW Director has approved and issued the Self-Assessment Management Plan that describes how RW will organize and manage its SA program. He has directed Associate/Office Directors to prepare individual Implementation Plans to provide specifics on how their Offices will meet the requirements of the RW SA Program. To assist in the preparation of these Implementation Plans, the RW Self-Assessment Unit (SAU), which manages the SA Program on behalf of the RW Director, has conducted a series of SA Implementation Workshops. The SAU has also developed an Annotated Outline for SA Implementation Plans. Following issuance of Office-specific Implementation Plans, independent evaluations by the SAU are planned

  11. Methods and challenges for the health impact assessment of vaccination programs in Latin America

    Directory of Open Access Journals (Sweden)

    Ana Marli Christovam Sartori

    2015-01-01

    Full Text Available ABSTRACT OBJECTIVE To describe methods and challenges faced in the health impact assessment of vaccination programs, focusing on the pneumococcal conjugate and rotavirus vaccines in Latin America and the Caribbean. METHODS For this narrative review, we searched for the terms "rotavirus", "pneumococcal", "conjugate vaccine", "vaccination", "program", and "impact" in the databases Medline and LILACS. The search was extended to the grey literature in Google Scholar. No limits were defined for publication year. Original articles on the health impact assessment of pneumococcal and rotavirus vaccination programs in Latin America and the Caribbean in English, Spanish or Portuguese were included. RESULTS We identified 207 articles. After removing duplicates and assessing eligibility, we reviewed 33 studies, 25 focusing on rotavirus and eight on pneumococcal vaccination programs. The most frequent studies were ecological, with time series analysis or comparing pre- and post-vaccination periods. The main data sources were: health information systems; population-, sentinel- or laboratory-based surveillance systems; statistics reports; and medical records from one or few health care services. Few studies used primary data. Hospitalization and death were the main outcomes assessed. CONCLUSIONS Over the last years, a significant number of health impact assessments of pneumococcal and rotavirus vaccination programs have been conducted in Latin America and the Caribbean. These studies were carried out few years after the programs were implemented, meet the basic methodological requirements and suggest positive health impact. Future assessments should consider methodological issues and challenges arisen in these first studies conducted in the region.

  12. Communication Skills assessed at OSCE are not affected by Participation in the Adolescent Healthy Sexuality Program

    Directory of Open Access Journals (Sweden)

    Deborah Penava

    2002-12-01

    Full Text Available We proposed that first year medical students who voluntarily participated in the Healthy Sexuality adolescent program would perform better than their peers on an adolescent counseling station at the year-end OSCE (Objective Structured Clinical Examination. In addition we compared medical students’ communication skills at the time of the program as assessed by self, peers and participating adolescents. Methods: Nineteen first year medical students voluntarily participated in the ongoing Healthy Sexuality program. Adolescent participants, medical student peer participants and medical students assessed communication components on a 7-point Likert scale at the end of the program. At the year-end OSCE, all first year medical students at the University of Western Ontario were assessed at an adolescent counseling station by a standardized patient (SP and a physician examiner. Statistical analysis examined differences between the two groups. Results: Students who participated in the Healthy Sexuality program did not perform better than their colleagues on the year-end OSCE. A statistically significant correlation between physician examiner and SP evaluations was found (r = 0.62. Adolescent participants communication skills assessments in the Healthy Sexuality Program demonstrated no significant correlation with medical student assessments (self or peer. Conclusions:Voluntary intervention with adolescents did not result in improved communication skills at the structured year-end examination. Further investigation will be directed towards delineating differences between SP and physician examiner assessments.

  13. Issues in assessing the cost-effectiveness of coordinated DSM programs

    International Nuclear Information System (INIS)

    Coordinated demand-side management (DSM) programs, co-administered by government agencies and electric and gas utilities, are likely to grow in importance in the coming years. Because of the unique features of these types of DSM programs, special care must be taken in assessing their cost-effectiveness. In this paper, we discuss these features, suggest how standard cost-effectiveness measures must be adapted to accommodate them, and show how important these adaptations are in assessing the cost-effectiveness of coordinated programs. At first, we use a least-cost, financial approach. The discussion indicates that failure to account properly for the special features of coordinated programs materially affects estimates of cost-effectiveness and, in extreme cases, may lead to rejection of otherwise cost-effective programs. Then extending the analysis to include economic factors, we speculate that most types of coordinated programs are more attractive than when evaluated on a financial basis. (author)

  14. Kyiv institutional buildings sector energy efficiency program: Technical assessment

    Energy Technology Data Exchange (ETDEWEB)

    Secrest, T.J.; Freeman, S.L. [Pacific Northwest National Lab., Richland, WA (United States); Popelka, A. [Tysak Engineering, Acton, MA (United States); Shestopal, P.A.; Gagurin, E.V. [Agency for Rational Energy Use and Ecology, Kyiv (Ukraine)

    1997-08-01

    The purpose of this assessment is to characterize the economic energy efficiency potential and investment requirements for space heating and hot water provided by district heat in the stock of state and municipal institutional buildings in the city of Kyiv. The assessment involves three activities. The first is a survey of state and municipal institutions to characterize the stock of institutional buildings. The second is to develop an estimate of the cost-effective efficiency potential. The third is to estimate the investment requirements to acquire the efficiency resource. Institutional buildings are defined as nonresidential buildings owned and occupied by state and municipal organizations. General categories of institutional buildings are education, healthcare, and cultural. The characterization activity provides information about the number of buildings, building floorspace, and consumption of space heating and hot water energy provided by the district system.

  15. Palau assessment for a continuing health care professional development program.

    Science.gov (United States)

    Chen, Tai-Ho; Dever, Gregory; Kuartei, Stevenson; Maskarinec, Gregory G

    2007-03-01

    In 2003, the University of Hawai'i Department of Family Medicine and Community Health entered a 4-year cooperative agreement with the U.S. Health Resources and Services Administration to establish the "Pacific Association for Clinical Training" (PACT). PACT's goal is to develop effective distance education methods to improve the education and skills of health care professionals in the U.S.-Affiliated Pacific Island nations. To determine the situation existing in 2004, one of PACT's first projects was to perform site visits to each jurisdiction, conducting needs assessments through interviews with key health care professionals, hospital administrators and government officials. This article highlights findings of PACT's Palau assessment. Meant to establish a baseline for future reference, all data were collected in 2004-2005 and have not been updated. PMID:19772140

  16. Implementing an Assessment Clinic in a Residential PTSD Program

    Directory of Open Access Journals (Sweden)

    Joan McDowell

    2014-08-01

    Full Text Available Creating useful treatment plans can help improve services to consumers of mental health services. As more evidence-based practices are implemented, deciding what treatment, at what time, for whom becomes an important factor in facilitating positive outcomes. Readiness for trauma-focused treatments for Posttraumatic Stress Disorder (PTSD such as Cognitive Processing Therapy or Prolonged Exposure Therapy may influence whether an individual can successfully complete either protocol. In addition, components of adjunctive therapies such as Acceptance and Commitment Therapy or Dialectical Behavior Therapy may be useful in moving a particular patient toward readiness and successful completion of treatment. Psychological assessment adds valuable data to inform these types of treatment decisions. This paper describes the implementation of a psychological assessment clinic in a residential PTSD treatment setting. Barriers to implementation, use of the data, and Veterans’ reactions to the feedback provided to them are included.

  17. Caries Risk Assessment/Treatment Programs in U.S. Dental Schools.

    Science.gov (United States)

    Yorty, Jack S.; Brown, K. Birgitta

    1999-01-01

    A survey of 42 U.S. dental schools was conducted to identify the number and characteristics of caries risk- assessment/treatment programs. Findings address lectures about caries risk, use of variable recall programs, categorization of risk level, early detection and treatment of lesions, and restoration of radiographically visible lesions. (DB)

  18. Research-Based Curriculum, Pedagogy, and Assessment in a Deaf Bilingual Program

    Science.gov (United States)

    Peterson, Laura

    2012-01-01

    The California School for the Deaf (CSD), Fremont, is a deaf-centered bilingual program. CSD's approach to curriculum development, instructional pedagogy, and assessment integrates best practices in deaf education, bilingual education, and general education. The goals of the program are outlined in the Expected School-wide Learning Results which…

  19. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  20. Using Projects Scoring Rubrics to Assess Student Learning in an Information Systems Program

    Science.gov (United States)

    Petkov, Doncho; Petkova, Olga; D'Onofrio, Marianne; Jarmoszko, A. T.

    2008-01-01

    This paper is about using projects for assessment of student learning in different courses of an Information Systems (IS) program. An overview of the role of educational projects in student learning is presented. The various aspects of defining standardized rubrics across an IS program are discussed. A methodology for the use of such rubrics in…

  1. Assessing Graduate Teacher Training Programs: Can a Teaching Seminar Reduce Anxiety and Increase Confidence?

    Science.gov (United States)

    Pelton, Julie A.

    2014-01-01

    Some effort to test the effectiveness of teacher assistant training programs is common, but these evaluations are typically limited to measures of student satisfaction. Two forms of assessment commonly used in elementary and secondary teacher training programs, measuring levels of teaching anxiety and teacher efficacy, may be of use for sociology…

  2. Puerto Rican Participation in Job Opportunities and Basic Skills (JOBS) Programs. A Preliminary Assessment.

    Science.gov (United States)

    Cruz, Jose E.

    This report presents the findings of a preliminary assessment of the strengths and weaknesses of the Job Opportunities and Basic Skills (JOBS) programs, the welfare-to-work centerpiece of the Family Support Act, for moving Puerto Rican welfare recipients closer to self-sufficiency. Programs in Newark (New Jersey), New York City, and Philadelphia…

  3. Counseling Health Psychology: Assessing Health Psychology Training within Counseling Psychology Doctoral Programs

    Science.gov (United States)

    Raque-Bogdan, Trisha L.; Torrey, Carrie L.; Lewis, Brian L.; Borges, Nicole J.

    2013-01-01

    Training directors of American Psychological Association-approved counseling psychology doctoral programs completed a questionnaire assessing (a) student and faculty involvement in health-related research, practice, and teaching; (b) health-related research conducted by students and faculty; and (c) programs' expectations and ability to…

  4. Biological assessment for the effluent reduction program, Los Alamos National Laboratory, Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Cross, S.P.

    1996-08-01

    This report describes the biological assessment for the effluent recution program proposed to occur within the boundaries of Los Alamos National Laboratory. Potential effects on wetland plants and on threatened and endangered species are discussed, along with a detailed description of the individual outfalls resulting from the effluent reduction program.

  5. Assessing the Role of the School Operational Grant Program in Improving Education Outcomes in Indonesia

    OpenAIRE

    World Bank

    2014-01-01

    Over the last ten years, Indonesia has continued to make significant progress in improving educational opportunities for all its citizens. The purpose of this report is to provide an assessment of the national school grants program, Bantuan Operasional Sekolah (BOS), and its contribution to progress in the education sector. The BOS program aimed to raise educational attainment through the ...

  6. The Implications of Learners' Goal Orientation in a Prior Learning Assessment Program

    Science.gov (United States)

    McClintock, Patricia

    2013-01-01

    This mixed methods sequential explanatory study was designed to investigate students' persistence in an online Prior Learning Assessment (PLA) Program by researching the implications of goal orientation and other academic, institutional, and student-related factors of non-traditional students enrolled in such a program at the University of St.…

  7. Manned space station environmental control and life support system computer-aided technology assessment program

    Science.gov (United States)

    Hall, J. B., Jr.; Pickett, S. J.; Sage, K. H.

    1984-01-01

    A computer program for assessing manned space station environmental control and life support systems technology is described. The methodology, mission model parameters, evaluation criteria, and data base for 17 candidate technologies for providing metabolic oxygen and water to the crew are discussed. Examples are presented which demonstrate the capability of the program to evaluate candidate technology options for evolving space station requirements.

  8. Peer Assessment and Compliance Review (PACR) Innovative Strategies Report. California Court Appointed Special Advocates (CASA) Programs

    Science.gov (United States)

    Macro, Bronwen; Huang, Lee Ann

    2005-01-01

    This report focuses on the innovative strategies study component of the Peer Assessment and Compliance Review (PACR) project. California (Court Appointed Special Advocates) CASA programs have developed many innovative strategies to serve children in their communities. At each of the programs visited during the PACR project, the team identified at…

  9. Research-Doctorate Programs in the Biomedical Sciences: Selected Findings from the NRC Assessment

    Science.gov (United States)

    Lorden, Joan F., Ed.; Kuh, Charlotte V., Ed.; Voytuk, James A., Ed.

    2011-01-01

    "Research Doctorate Programs in the Biomedical Sciences: Selected Findings from the NRC Assessment" examines data on the biomedical sciences programs to gather additional insight about the talent, training environment, outcomes, diversity, and international participation in the biomedical sciences workforce. This report supports an earlier…

  10. Methods Used for the Assessment of Student Outcomes from Master's Degree Programs in Organizational Leadership

    Science.gov (United States)

    Pugh, Joseph W. T.

    2009-01-01

    This descriptive, non-experimental, cross-sectional study inquired into the methods used to assess the student outcomes of master's degree programs in organizational leadership. A survey questionnaire was submitted to the directors of master's degree programs in organizational leadership at ninety-three not-for-profit institutions of higher…

  11. The Expert Panel's Framework for Assessing the Quality of Educational Technology Programs.

    Science.gov (United States)

    Smith, Marshall S.; Casserly, Catherine M.

    2002-01-01

    Reviews the framework developed by the Expert Panel on Educational Technology, considers the tradeoffs of its broad-based approach, and presents an alternative model for assessing educational technology programs. Discusses what can be expected from educational technology programs; how educational change occurs; barriers to effective technology…

  12. Study on Design and Implementation of JAVA Programming Procedural Assessment Standard

    Science.gov (United States)

    Tingting, Xu; Hua, Ma; Xiujuan, Wang; Jing, Wang

    2015-01-01

    The traditional JAVA course examination is just a list of questions from which we cannot know students' skills of programming. According to the eight abilities in curriculum objectives, we designed an assessment standard of JAVA programming course that is based on employment orientation and apply it to practical teaching to check the teaching…

  13. Evaluation of a Career Development and Assessment Center Program for Professional Librarians.

    Science.gov (United States)

    Melber, Barbara D.; McLaughlin, Steven D.

    1985-01-01

    This paper presents an evaluation of the impact of the Career Development and Assessment Center for Librarians on the professional position of program participants (assessees) and on the managerial level librarians serving as assessors for the program. Changes over time in nonparticipant applicants (control group) and assessee groups are compared.…

  14. Aligning Cultural Responsiveness in Evaluation and Evaluation Capacity Building: A Needs Assessment with Family Support Programs

    OpenAIRE

    Cook, Natalie Ebony

    2016-01-01

    Family support programs serve vulnerable families by providing various forms of support, such as education, health services, financial assistance, and referrals to community resources. A major feature of evaluation involves assessing program effectiveness and learning from evaluation findings (Mertens and Wilson, 2012). Collaboration and cultural responsiveness are important topics in evaluation which remain largely distinct in the literature. However, evaluation capacity building provides a...

  15. Collection Assessment and the Library Liaison Program: A Practical Focus

    OpenAIRE

    David Brennan

    2015-01-01

    In the fall of 2013, the George T. Harrell Health Sciences Library (HHSL) undertook a collection assessment and development project to determine journal and monograph holdings across the Penn State University Libraries in subject areas related to librarian liaison assignments in the health sciences at Penn State Hershey. This project had several aims: a) to assist in collection development activities by showing current journal and monograph holdings in relation to liaison areas in a way relat...

  16. Curriculum Development Based on the Big Picture Assessment of the Mechanical Engineering Program

    OpenAIRE

    Mohd Anas Mohd Sabri; Nor Kamaliana Khamis; Mohd Faizal Mat Tahir; Zaliha Wahid; Ahmad Kamal Ariffin Mohd. Ihsan; Abu Bakar Sulong; Shahrum Abdullah

    2013-01-01

    One of the major concerns of the Engineering Accreditation Council (EAC) is the need for an effective monitoring and evaluation of program outcome domains that can be associated with courses taught under the Mechanical Engineering program. However, an effective monitoring method that can determine the results of each program outcome using Bloom’s Taxonomy has not yet been established for each course. The purpose of this research is to conduct a Big Picture Assessment to achieve Outcome-Based ...

  17. Summary results of an assessment of research projects in the Nuclear Medicine Research program

    International Nuclear Information System (INIS)

    In May 1987, OHER management requested the Office of Program Analysis (OPA) to conduct a peer review of the projects of the DOE Nuclear Medicine Research program. This was done using procedures and a quantitative methodology OPA developed for assessing DOE research programs. Sixty-three individual nuclear medicine projects were reviewed by seven panels; one panel on isotopes and radioisotopes, three on radiopharmacology, two on clinical feasibility, and one on instrumentation. Each panel consisted of five to ten knowledgeable reviewers. 5 figs

  18. Seventh annual survey of Canadian natural gas deliverability, production, reserves, and investment

    International Nuclear Information System (INIS)

    A survey was conducted to obtain information on the state of natural gas producers' price expectations and investment intentions in Canada. Forecasts for drilling, reserve additions, reserves, deliverability and production were estimated from survey responses. Survey projections were analyzed and compared with other forecasts. The study covers a five-year period starting with 1996 actuals, 1997 estimates, and forecasts for 1998 through 2000. The forecast is for substantial increases to Western Canada Sedimentary Basin (WCSB) pipeline capacity by the third quarter of 2000. Major projects include TransCanada's 1998 facilities expansion, the 1998 Foothills Pipe Lines-Northern Border pipeline expansion, TransCanada's 1999 facilities expansion, and the Alliance Pipeline project which is scheduled to be in service by the third quarter of 2000. Given the low market price for crude oil, industry participants are hoping that additional capacity will lead to improved prices and strong markets for natural gas. refs., tabs., figs

  19. Deliverable 3.3.2 Specification of tests and test groups

    DEFF Research Database (Denmark)

    Peterson, Carrie Beth; Mitseva, Anelia; Harpur, Jill;

    2009-01-01

    Deliverable 3.3.2: Specification of tests and test groups One of the main goals of the ISISEMD project is to offer innovative ICT services to improve the quality of life of elderly persons with cognitive problems or mild dementia and their informal and formal caregivers who provide every day care...... for them. This will be done via integrating intelligent scalable ICT services which will be tested for a period of 12 months under realistic conditions. Offering the services could not be complete without evaluating quality of life improvement, user acceptance and user satisfaction with a representative...... group of the target user groups. This document is devoted to describing important aspects of services evaluation such as: who the test participants will be, inclusion and exclusion criterion, selection standards, how the test participants will be recruited, ethical considerations, etc. Test methodology...

  20. Deliverable 2.2.1 Use Scenarios in the Pilot Services

    DEFF Research Database (Denmark)

    Peterson, Carrie Beth

    2010-01-01

    Deliverable 2.2.1 - Use scenarios in the pilot services During the first phase of ISISEMD project (WP1) the user requirements analysis phase, mainly D1.1.1, has proposed a list of services organized in three groups (bundles as in Dow) and classified as mandatory or not mandatory and leading to di...... how the services look like and shall work at runtime. The integration work is now in progress and during the next months the design, workflow, GUI etc. for each service will be fully integrated, tested and evaluated in cooperation with the regions according to the project plan...... and usage scenarios of service bundles to be implemented in the ISISEMD Pilot platform in each of the four regions during the pilot. The services/sub functions are presented as workflows and also described by presenting how the Graphical User Interface will be organized and designed thus reflecting...

  1. Evaluation model for developing, implementing, and assessing conservation education programs: Examples from Belize and Costa Rica

    Science.gov (United States)

    Jacobson, Susan K.

    1991-03-01

    Evaluation of conservation education programs can: (1) provide accountability in demonstrating a program's worth, (2) offer an opportunity for receiving feedback and improving programs, (3) further our understanding of the process of program development, and (4) promote conservation education by substantiating claims about its benefits. The Planning-Process-Product systems evaluation model provides feedback needed for making decisions about the development, implementation, and outcome of a program. Planning evaluation was useful in assessing the needs, goals, opportunities, and constraints of a number of programs in Costa Rica and Belize, such as a forestry education project and a zoo outreach program. It provided a basis for making planning decisions incorporating specific objectives, such as the reforestation of a region or a change in knowledge and attitudes in program participants. Process evaluation provided a Costa Rican sustainable development program with feedback during its implementation and enabled it to modify and improve its newsletter for local farmers and its ecology classes for school children. Product evaluation assessed project accomplishments, such as the 700,000 raised by the Children's Rainforest group and the 20 miles of riparian land under conservation management as part of the Belize Community Baboon Sanctuary project. Outcomes are compared with the programs original monetary or land management objectives to determine the success of the programs and to provide feedback for improvement.

  2. Genetic algorithm based deliverable segments optimization for static intensity-modulated radiotherapy

    International Nuclear Information System (INIS)

    The static delivery technique (also called step-and-shoot technique) has been widely used in intensity-modulated radiotherapy (IMRT) because of the simple delivery and easy quality assurance. Conventional static IMRT consists of two steps: first to calculate the intensity-modulated beam profiles using an inverse planning algorithm, and then to translate these profiles into a series of uniform segments using a leaf-sequencing tool. In order to simplify the procedure and shorten the treatment time of the static mode, an efficient technique, called genetic algorithm based deliverable segments optimization (GADSO), is developed in our work, which combines these two steps into one. Taking the pre-defined beams and the total number of segments per treatment as input, the number of segments for each beam, the segment shapes and weights are determined automatically. A group of interim modulated beam profiles quickly calculated using a conjugate gradient (CG) method are used to determine the segment number for each beam and to initialize segment shapes. A modified genetic algorithm based on a two-dimensional binary coding scheme is used to optimize the segment shapes, and a CG method is used to optimize the segment weights. The physical characters of a multileaf collimator, such as the leaves interdigitation limitation and leaves maximum over-travel distance, are incorporated into the optimization. The algorithm is applied to some examples and the results demonstrate that GADSO is able to produce highly conformal dose distributions using 20-30 deliverable segments per treatment within a clinically acceptable computation time

  3. A Multifaceted Approach to Teamwork Assessment in an Undergraduate Business Program

    Science.gov (United States)

    Kemery, Edward R.; Stickney, Lisa T.

    2014-01-01

    We describe a multifaceted, multilevel approach to teamwork learning and assessment. It includes teamwork knowledge, peer and self-appraisal of teamwork behavior, and individual and team performance on objective tests for teaching and assessing teamwork in an undergraduate business program. At the beginning of this semester-long process, students…

  4. United States Geological Survey uranium and thorium resource assessment and exploration research program, fiscal year 1980

    International Nuclear Information System (INIS)

    Research is being conducted by the USGS for the NURE program in six fields: geochemistry and mineralogy, sedimentary environments, igneous and metamorphic environments, geophysical exploration techniques, U resource assessment, and Th resource assessment. Some FY 1979 research results are reported and discussed

  5. German Language and Culture: 9-Year Program Classroom Assessment Materials, Grade 4

    Science.gov (United States)

    Alberta Education, 2008

    2008-01-01

    This document is designed to provide assessment materials for specific Grade 4 outcomes in the German Language and Culture Nine-year Program, Grades 4-5-6. The assessment materials are designed for the beginner level in the context of teaching for communicative competence. Grade 4 learning outcomes from the German Language and Culture Nine-year…

  6. Assessing Graduate Engineering Programs with ePortfolios: A Comprehensive Design Process

    Science.gov (United States)

    Kajfez, Rachael L.; Mohammadi-Aragh, Mahnas J.; Brown, Philip R.; Mann, Katharine A.; Carrico, Cheryl A.; Cross, Kelly J.; Janeski, John A.; McNair, Lisa D.

    2013-01-01

    ePortfolios (ePs) have been used in a variety of applications ranging from undergraduate assessment to graduate student work showcases. We hypothesize that the flexible, individualized nature of ePs makes them suitable assessment tools for graduate engineering programs, which are likewise flexible and individualized. Our investigation resulted in…

  7. 76 FR 59069 - Revision to the Section 8 Management Assessment Program Lease-Up Indicator

    Science.gov (United States)

    2011-09-23

    ...This proposed rule would amend HUD's regulations for the Section 8 Management Assessment program (SEMAP) to revise the process by which HUD measures and verifies performance under the SEMAP lease-up indicator. Specifically, HUD proposes to amend the existing regulation to reflect that assessment of a public housing agency's (PHA) leasing indicator will be based on a calendar year cycle, rather......

  8. Assessing the Strengths & Weaknesses of Family Physician Program

    Directory of Open Access Journals (Sweden)

    ALI JANATI

    2010-01-01

    Full Text Available Introduction: This study was carried out to evaluate the family physicians program (strengths and weaknesses in Maragheh. Methods: In this descriptive cross-sectional study, the study population included 375 under care people, family physicians, health system managers and staffs from Rural Health Centers in Maragheh. Data collection instruments were questionnaire and checklist which have already been confirmed for reliability& validity. SPSS software was used for date analysis. Results: About %97 of participants had awareness about family physician implementation; 97/6% used family physician services and 96/8 had health insurance. The major strengths of family physician program were: developing the health files for all people, improving prenatal and child care, increasing easy access to physician and medicine, and decreasing health expenditure for people. However, the major weaknesses were: increasing health houses customers, lack of job security and delay in salary payment for family physician team members, and limited availability of physician in health houses. Conclusion: The study results imply some suggestions that can solve family physician weaknesses, improve quality of delivered care, and increase customer’s satisfaction: 1. developing electronic health files for family physician clients. 2. Motivating and briefing specialists on the manners of dealing with referred patients and giving appropriate feedback. 3. Revising and redefining the target population. 4. Solving financial problems of family physician team members.

  9. Handbook for nuclear power plant self-assessment programs. Final report, July 1991

    International Nuclear Information System (INIS)

    EPRI has prepared this handbook to help utilities with their Self-Assessment Programs at nuclear power plants. Self-assessments are independent reviews performed by nuclear plant utilities to identify trends in operational activities that are important to safety, and to assess the impact of these trends on plant safety. Activities performed as self-assessments include reviews and evaluations of plant performance and abnormal events, technical evaluations of plant activities to identify potential problem areas, and reviews of other sources of plant design and operating experience for applicability to safety. This handbook is based on information obtained from utilities and includes examples of activities and methods that have proven effective. The handbook includes a summary of NRC requirements, guidelines for self-assessment program planning, descriptions and examples of investigative techniques, and key references that can be consulted for additional information. It can serve as a training guide for plant staff members who are assigned to self-assessment activities. (author)

  10. 1992--1993 low-temperature geothermal assessment program, Colorada

    Energy Technology Data Exchange (ETDEWEB)

    Cappa, J.A.; Hemborg, H.T.

    1995-01-01

    Previous assessments of Colorado`s low-temperature geothermal resources were completed by the Colorado Geological Survey in 1920 and in the mid- to late-1970s. The purpose of the 1992--1993 low-temperature geothermal resource assessment is to update the earlier physical, geochemical, and utilization data and compile computerized databases of the location, chemistry, and general information of the low-temperature geothermal resources in Colorado. The main sources of the data included published data from the Colorado Geological Survey, the US Geological Survey WATSTOR database, and the files of the State Division of Water Resources. The staff of the Colorado Geological Survey in 1992 and 1993 visited most of the known geothermal sources that were recorded as having temperatures greater than 30{degrees}C. Physical measurements of the conductivity, pH, temperature, flow rate, and notes on the current geothermal source utilization were taken. Ten new geochemical analyses were completed on selected geothermal sites. The results of the compilation and field investigations are compiled into the four enclosed Quattro Pro 4 databases. For the purposes of this report a geothermal area is defined as a broad area, usually less than 3 sq mi in size, that may have several wells or springs. A geothermal site is an individual well or spring within a geothermal area. The 1992-1993 assessment reports that there are 93 geothermal areas in the Colorado, up from the 56 reported in 1978; there are 157 geothermal sites up from the 125 reported in 1978; and a total of 382 geochemical analyses are compiled, up from the 236 reported in 1978. Six geothermal areas are recommended for further investigation: Trimble Hot Springs, Orvis Hot Springs, an area southeast of Pagosa Springs, the eastern San Luis Valley, Rico and Dunton area, and Cottonwood Hot Springs.

  11. Final Report Low-temperature Resource Assessment Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.J. [Geo-Heat Center, Oregon Institute of Technology, Klamath Falls, OR (US); Ross, H. [Earth Sciences and Resources Institute, University of Utah

    1996-02-01

    The U.S. Department of Energy - Geothermal Division (DOE/GD) recently sponsored the Low-Temperature Resource Assessment project to update the inventory of the nation's low- and moderate-temperature geothermal resources and to encourage development of these resources. A database of 8,977 thermal wells and springs that are in the temperature range of 20 degrees Celsius to 150 degrees Celsius has been compiled for ten western states, an impressive increase of 82% compared to the previous assessments. The database includes location, descriptive data, physical parameters, water chemistry and references for sources of data. Computer-generated maps are also available for each state. State Teams have identified 48 high-priority areas for near-term comprehensive resource studies and development. Resources with temperatures greater than 50 degrees Celsius located within 8 km of a population center were identified for 271 collocated cities. Geothermal energy costevaluation software has been developed to quickly identify the cost of geothermally supplied heat to these areas in a fashion similar to that used for conventionally fueled heat sources.

  12. Low-temperature resource assessment program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.J. [Oregon Inst. of Tech., Klamath Falls, OR (United States). Geo-Heat Center; Ross, H. [Utah Univ., Salt Lake City, UT (United States). Earth Sciences and Resources Inst.

    1996-02-01

    The US Department of Energy - Geothermal Division (DOE/GD) recently sponsored the Low-Temperature Resource Assessment project to update the inventory of the nation`s low- and moderate-temperature geothermal resources and to encourage development of these resources. A database of 8,977 thermal wells and springs that are in the temperature range of 20{degrees}C to 150{degrees}C has been compiled for ten western states, an impressive increase of 82% compared to the previous assessments. The database includes location, descriptive data, physical parameters, water chemistry and references for sources of data. Computer-generated maps are also available for each state. State Teams have identified 48 high-priority areas for near-term comprehensive resource studies and development. Resources with temperatures greater than 50{degrees}C located within 8 km of a population center were identified for 271 collocated cities. Geothermal energy cost evaluation software has been developed to quickly identify the cost of geothermally supplied heat to these areas in a fashion similar to that used for conventionally fueled heat sources.

  13. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    The Nevada Risk Assessment/Management Program is part of a national effort by the U.S. Department of Energy (Grant DE-FG01-96EW56093) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the Nevada Risk Assessment/Management Program and presents a synopsis of the effort that began in 1995 and will officially conclude on April 30, 2000. (author)

  14. The 1980-1982 Geothermal Resource Assessment Program in Washington

    Energy Technology Data Exchange (ETDEWEB)

    Korosec, Michael A.; Phillips, William M.; Schuster, J.Eric

    1983-08-01

    Since 1978, the Division of Geology and Earth Resources of the Washington Department of Natural Resources has participated in the U.S. Department of Energy's (USDOE) State-Coupled Geothermal Resource Program. Federal and state funds have been used to investigate and evaluate the potential for geothermal resources, on both a reconnaissance and area-specific level. Preliminary results and progress reports for the period up through mid-1980 have already been released as a Division Open File Report (Korosec, Schuster, and others, 1981). Preliminary results and progress summaries of work carried out from mid-1980 through the end of 1982 are presented in this report. Only one other summary report dealing with geothermal resource investigations in the state has been published. An Information Circular released by the Division (Schuster and others, 1978) compiled the geology, geochemistry, and heat flow drilling results from a project in the Indian Heaven area in the south Cascades. The previous progress report for the geothermal program (Korosec, Schuster, and others, 1981) included information on temperature gradients measured throughout the state, heat flow drilling in the southern Cascades, gravity surveys for the southern Cascades, thermal and mineral spring investigations, geologic mapping for the White Pass-Tumac Mountain area, and area specific studies for the Camas area of Clark County and Mount St. Helens. This work, along with some additional studies, led to the compilation of the Geothermal Resources of Washington map (Korosec, Kaler, and others, 1981). The map is principally a nontechnical presentation based on all available geothermal information, presented as data points, tables, and text on a map with a scale of 1:500,000.

  15. Validation of an age-modified caries risk assessment program (Cariogram) in preschool children

    DEFF Research Database (Denmark)

    Holgerson, Pernilla Lif; Twetman, Svante; Stecksèn-Blicks, Christina

    2009-01-01

    OBJECTIVES: (i) To validate caries risk profiles assessed with a computer program against actual caries development in preschool children, (ii) to study the possible impact of a preventive program on the risk profiles, and (iii) to compare the individual risk profiles longitudinally. MATERIAL AND...... variables associated with caries were collected through clinical examinations and questionnaires, and scored and computed with a risk assessment program (Cariogram). RESULTS: Children assessed as having a "low chance (0-20%) of avoiding caries" had significantly higher caries at 7 years of age compared to...... METHODS: Caries risk was assessed in 125 two-year-old children invited to participate in a 2-year caries-preventive trial with xylitol tablets. At 7 years of age, 103 were available for follow-up, 48 from the former intervention group and 55 from the control group. At baseline and after 5 years, 7...

  16. Gas reactor international cooperative program. HTR-synfuel application assessment

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    This study assesses the technical, environmental and economic factors affecting the application of the High Temperature Gas-Cooled Thermal Reactor (HTR) to: synthetic fuel production; and displacement of fossil fuels in other industrial and chemical processes. Synthetic fuel application considered include coal gasification, direct coal liquefaction, oil shale processing, and the upgrading of syncrude to motor fuel. A wide range of other industrial heat applications was also considered, with emphasis on the use of the closed-loop thermochemical energy pipeline to supply heat to dispersed industrial users. In this application syngas (H/sub 2/ +CO/sub 2/) is produced at the central station HTR by steam reforming and the gas is piped to individual methanators where typically 1000/sup 0/F steam is generated at the industrial user sites. The products of methanation (CH/sub 4/ + H/sub 2/O) are piped back to the reformer at the central station HTR.

  17. Gas reactor international cooperative program. HTR-synfuel application assessment

    International Nuclear Information System (INIS)

    This study assesses the technical, environmental and economic factors affecting the application of the High Temperature Gas-Cooled Thermal Reactor (HTR) to: synthetic fuel production; and displacement of fossil fuels in other industrial and chemical processes. Synthetic fuel application considered include coal gasification, direct coal liquefaction, oil shale processing, and the upgrading of syncrude to motor fuel. A wide range of other industrial heat applications was also considered, with emphasis on the use of the closed-loop thermochemical energy pipeline to supply heat to dispersed industrial users. In this application syngas (H2 +CO2) is produced at the central station HTR by steam reforming and the gas is piped to individual methanators where typically 10000F steam is generated at the industrial user sites. The products of methanation (CH4 + H2O) are piped back to the reformer at the central station HTR

  18. A directory of computer programs for assessment of radioactive waste disposal in geological formations. Volume 1

    International Nuclear Information System (INIS)

    This directory describes computer programs suitable for the assessment of radioactive waste disposal facilities in geological formations. The programs, which are mainly applicable to the post-closure analysis of the repository, address combinations of the following topics: nuclide inventory, corrosion, leaching, geochemistry, geomechanics, heat transfer, groundwater flow, radionuclide migration, biosphere modelling, safety assessment and site evolution. A total of 320 programs are identified of which 84 are reviewed in detail, 192 in summary and 44 in tabular fashion. Originally published in 1983, the directory was updated in 1985 with the addition of new programs and the revision of some of the existing program reviews. This directory has been completely rewritten in 1991 with the addition of more new programs and a full revision of all the existing program reviews, some of which have been deleted as they are no longer in general use. Although the directory is specific to the post-closure assessment of a repository site, some of the programs described can also be used in other areas of repository (e.g. repository design). This directory is composed of two volumes, the present volume is the first

  19. A directory of computer programs for assessment of radioactive waste disposal in geological formations. Volume 2

    International Nuclear Information System (INIS)

    This directory describes computer programs suitable for the assessment of radioactive waste disposal facilities in geological formations. The programs, which are mainly applicable to the post-closure analysis of the repository, address combinations of the following topics: nuclide inventory, corrosion, leaching, geochemistry, geomechanics, heat transfer, groundwater flow, radionuclide migration, biosphere modelling, safety assessment and site evolution. A total of 320 programs are identified, of which 84 are reviewed in detail, 192 in summary and 44 in tabular fashion. Originally published in 1983, the directory was updated in 1985 with the addition of new programs and the revision of some of the existing program reviews. This directory has been completely rewritten in 1991 with the addition of more new programs and a full revision of all the existing program reviews, some of which have been deleted as they are no longer in general use. Although the directory is specific to the post-closure assessment of a repository site, some of the programs described can also be used in other areas of repository (e.g. repository design). This directory is composed of two volumes, the present volume is the second

  20. DOE [Department of Energy]-Nuclear Energy Standards Program annual assessment, FY 1990

    International Nuclear Information System (INIS)

    To meet the objectives of the programs funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a nuclear standards program and related activities and fosters the development and application of standards. This standards program is carried out in accordance with the principles in DOE Order 1300.2, Department of Energy Standards Program, December 18, 1980. The purposes of this effort, as set forth in three subtasks, are to (1) manage the NE Standards Program, (2) manage the development and maintenance of NE standards, and (3) operate an NE Standards Information Program. This report assesses the Performance Assurance Project Office (PAPO) activities in terms of the objectives of the Department of Energy-Nuclear Energy (DOE-NE) funded programs. To meet these objectives, PAPO administers a nuclear standards program and related activities and fosters the development and application of standards. This task is carried out in accordance with the principles set forth in DOE Order 1300.2, Department of Energy Standards Program, December 18, 1980, and DOE memorandum, Implementation of DOE Orders on Quality Assurance, Standards, and Unusual Occurrence Reporting for Nuclear Energy Programs, March 3, 1982, and with guidance from the DOE-NE Technology Support Programs. 1 tab. (JF)

  1. 77 FR 25457 - Applications for New Awards; Enhanced Assessment Instruments Grants Program-Enhanced Assessment...

    Science.gov (United States)

    2012-04-30

    ...--Enhanced Assessment Instruments (English Language Proficiency Competition); Notice inviting applications... April 19, 2011 (76 FR 21986). Absolute Priorities: For awards made from this competition in 2012 with FY... Priority 5--English Language Proficiency Assessment System. To meet this priority, an applicant...

  2. Radwaste assessment program for nuclear station modifications by design engineering

    International Nuclear Information System (INIS)

    Radwaste burial for Duke Power Company's (DPC's) seven nuclear units has become a complicated and costly process. Burial costs are based on overall volume, surcharges for radioactivity content and weight of containers, truck and cask rental, driver fees, and state fees and taxes. Frequently, radwaste costs can be as high as $500 per drum. Additionally, DPC is limited on the total burial space allocated for each plant each year. The thrust of this program is to reduce radwaste volumes needing burial at either Barnwell, South Carolina, or Richland, Washington. A limited number of options are available at our sites: (a) minimization of radwaste volume production, (b) segregation of contamination and noncontaminated trash, (c) decontamination of small hardware, (d) volume reduction of compatible trash, (e) incineration of combustible trash (available at Oconee in near future), and (f) burial of below-regulatory-concern very low level waste on site. Frequently, costs can be reduced by contracting services outside the company, i.e., supercompaction, decontamination, etc. Information about radwaste volumes, activities, and weight, however, must be provided to the nuclear production department (NPD) radwaste group early in the nuclear station modification (NSM) process to determine the most cost-effective method of processing radwaste. In addition, NSM radwaste costs are needed for the NPD NSM project budget. Due to the advanced planning scope of this budget, NSM construction costs must be estimated during the design-phase proposal

  3. Inclusion of small signal stability assessment to electromagnetic transient programs

    Energy Technology Data Exchange (ETDEWEB)

    Lucas, J.R. [Moratuwa Univ. (Sri Lanka); Annakkage, U.D.; Karawita, C. [Manitoba Univ., Winnipeg, MB (Canada); Muthumuni, D.; Jayasinghe, R.P. [Manitoba HVDC Research Centre, Winnipeg, MB (Canada)

    2008-07-01

    Power system stability refers to the ability of an electrical power system to regain a state of operating equilibrium after being subjected to a physical disturbance. In this study, a small-signal stability (SSS) module was formulated for use with the transient simulation tool called PSCAD. The package was developed in an effort to provide small-signal stability assessment of case studies on PSCAD, and an adaptable simulation background for users to carry out conventional controller design without the need for an outside package. Once fully developed, the SSS module will be capable of incorporating all the system models available on PSCAD. Simulation results for the benchmark 12 bus system showed that it is a powerful and promising tool for carrying out small-signal analysis together with transient analysis, particularly for power system controller design to prevent instabilities. Validation has been carried out by comparison of Eigenvalues with SSAT and time domain responses with PSCAD/EMTDC. It was concluded that SSS could be effectively used to study the stability of a proposed power system before detailed simulation on an EMT type simulation is carried out. 11 refs., 5 tabs., 4 figs.

  4. MRI assessment program. Consensus statement on clinical efficacy of MRI

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    This consensus statement is largely based on the experience gained at the MRI units at the four hospitals which have operated scanners in the MRI program. It reflects the considered opinion of the radiologists responsible for the MRI services at those hospitals. Account has also been taken of relevant overseas data. This collection of opinion relates particularly to comparison with other imaging modalities. The specific comments will require further consideration as technical developments with MRI become available, additional experience is gained with gadolinium contrast material and additional data are obtained on the influence of MRI on patient management. MRI, at present, is used either to improve diagnostic accuracy when other tests are negative or equivocal, when there is strong clinical suspicion of disease, or to improve surgical or other management planning when the diagnosis known. In some situations (eg syringomyelia, congenital spinal disease, posterior fossa/cerebello-pontine angle tumours) it may entirely replace other tests (eg myelography, air contrast, CT) which are substantially less accurate and/or more invasive. In other situations (eg hemispheric brain tumours, lumbar disc protrusions) when other tests, such as CT, can be as accurate, MRI is not usually or initially indicated because it is currently more expensive and of limited availability. However, balanced against this is the fact that it does not expose the patient to potentially harmful ionising radiation. It is also stressed that MRI images depend on complex, widely variable and, as yet, incompletely understood parameters. There is concern that this may result in false positive diagnoses, especially where MRI is used alone as a screening test, or used as the initial test. For several reasons (availability, cost, medical and diagnostic efficacy), the specific comments on indications for MRI presented are based upon the assumption that MRI is a tertiary and complementary imaging examination

  5. Integrated chemical effects test program for PWR sump performance assessment

    International Nuclear Information System (INIS)

    Products attributable to chemical interactions between the emergency core cooling system (ECCS) containment spray water and exposed materials (such as metal surfaces, paint chips, and fiberglass insulation debris) could impede the performance of ECCS recirculation following a loss-of-coolant accident (LOCA) at a pressurized-water reactor (PWR). Five tests have been conducted in the ICET (Integrated Chemical Effects Test) test loop in order to simulate the chemical environment present inside a PWR containment water pool following a LOCA. The tests were conducted for 30 days at a constant temperature of 60 Celsius degrees. The materials tested within this environment included representative amounts of submerged and un-submerged aluminum, copper, concrete, zinc, carbon steel, and insulation samples (either 100% fiberglass or a combination of 80% calcium-silicate and 20% fiberglass by volume). Representative amounts of concrete dust and latent debris were also added to the test solution. Water was circulated through the bottom portion of the test tank during the entire test to achieve representative flow rates over the submerged specimens. Overall, the ICET program provided some insights and initial understanding regarding solution chemistry, as well as the types and amounts of chemical reaction products that may form in the ECCS containment sump pool. The observed chemical products may potentially contribute to pressure losses across a debris-laden sump screen, as well as performance degradation of ECCS components downstream of the sump screen. The ICET results indicate that: -1) chemical reaction products with varied quantities, consistencies, attributes, and apparent formation mechanisms were found; -2) containment materials (metallic, non-metallic, and insulation debris), pH, buffering agent, temperature, and time are all important variables that influence chemical product formation; and -3) changes to one important environmental variable (e.g., pH adjusting agent

  6. Building condition assessment program - risk evaluation and liability management

    International Nuclear Information System (INIS)

    Chalk River Laboratories (CRL) is a large nuclear research and development/industrial site operated by Atomic Energy of Canada Limited (AECL). The CRL site consists of a 70 hectare developed (industrial) site located within a larger undeveloped area (Supervised Area - 37 km2, or 3700 hectares). Construction of the CRL site started in 1944. The development and operating history includes the construction and operation of 7 research reactors and numerous associated supporting nuclear laboratories, including fuel fabrication facilities, research laboratories, test facilities, and waste processing facilities. Numerous other support facilities were also constructed, such as administrative and office buildings, manufacturing facilities, and buildings for essential services such as fire and security services. Altogether, the CRL site includes roughly 120 buildings (Figure 1), and the site continues to operate in the fields of nuclear research and development and medical isotope production. Within this operating environment, a number of buildings, facilities, structures, and reactors (hereinafter referred to as buildings), have become redundant and have been shut down for various reasons. Redundant buildings are currently shut down within the operating organization and turned over to the decommissioning organization for decommissioning, but in the early years, in the absence of a decommissioning program, redundant buildings were most often simply placed into storage for an undefined period. As a result, there are a significant number of buildings at CRL that have been declared redundant (roughly 20, or 1400 m2 ), particularly those constructed in the early years of site development. Further, with many buildings at CRL approaching the ends of their design life, a significant number of other buildings will become redundant during the next decade (an additional 20). (author)

  7. MRI assessment program. Consensus statement on clinical efficacy of MRI

    International Nuclear Information System (INIS)

    This consensus statement is largely based on the experience gained at the MRI units at the four hospitals which have operated scanners in the MRI program. It reflects the considered opinion of the radiologists responsible for the MRI services at those hospitals. Account has also been taken of relevant overseas data. This collection of opinion relates particularly to comparison with other imaging modalities. The specific comments will require further consideration as technical developments with MRI become available, additional experience is gained with gadolinium contrast material and additional data are obtained on the influence of MRI on patient management. MRI, at present, is used either to improve diagnostic accuracy when other tests are negative or equivocal, when there is strong clinical suspicion of disease, or to improve surgical or other management planning when the diagnosis known. In some situations (eg syringomyelia, congenital spinal disease, posterior fossa/cerebello-pontine angle tumours) it may entirely replace other tests (eg myelography, air contrast, CT) which are substantially less accurate and/or more invasive. In other situations (eg hemispheric brain tumours, lumbar disc protrusions) when other tests, such as CT, can be as accurate, MRI is not usually or initially indicated because it is currently more expensive and of limited availability. However, balanced against this is the fact that it does not expose the patient to potentially harmful ionising radiation. It is also stressed that MRI images depend on complex, widely variable and, as yet, incompletely understood parameters. There is concern that this may result in false positive diagnoses, especially where MRI is used alone as a screening test, or used as the initial test. For several reasons (availability, cost, medical and diagnostic efficacy), the specific comments on indications for MRI presented are based upon the assumption that MRI is a tertiary and complementary imaging examination

  8. Pacific Reef Assessment and Monitoring Program Rapid Ecological Assessment Quadrat Surveys of Corals around the Marianas Islands from 2003 to 2007

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Pacific Reef Assessment and Monitoring Program (Pacific RAMP), established by the Coral Reef Ecosystem Program (CREP) of the NOAA Pacific Islands Fisheries...

  9. Fire fighting capability assessment program Bruce B NGS

    International Nuclear Information System (INIS)

    This is a report on the completion of work relating to the assessment of the capability of Bruce B NGS to cope with a large fire incident. This included an evaluation of an exercise scenario that would simulate a large fire incident and of their fire plans and procedures. Finally the execution of fire plans by Bruce B NGS, as demonstrated by their application of human and material resources during a simulated large fire, was observed. The fire fighting equipment and the personal protective clothing and associated equipment that was in use was all of good quality and in good condition. There had also been notable improvement in communications equipment. Similarly, the human resources that had been assigned to fire fighting and rescue crews and that were available were more than adequate. Use of a logical incident command system, and the adoption of proper policy and procedures for radio communications were equally significant improvements. Practice should correct the breakdowns that occurred in these areas during the exercise. As well, there remains a need for the development of policy on fire fighting and rescue operations with more depth and clarity. In summary, the key point to be recognized is the degree of improvement that has been realized since the previous evaluation in 1990. Clearly the Emergency Response Teams organization of Bruce B NGS is evolving into an effective fire fighting force. Providing that the deficiencies identified in this report are addressed satisfactorily, Fire Cross is confident that the organization will have the capability to provide rescue and fire fighting services that will satisfy the need. 2 figs

  10. An assessment of the usability of undergraduate healthcare management program websites.

    Science.gov (United States)

    Roggenkamp, Susan D

    2005-01-01

    Prospective students in higher education programs increasingly use the Internet as a source of information to assist in the selection of both university and major programs of study. Therefore, having an informative and well designed website is now an integral component of a higher education program's marketing mix. This article attempts to inform undergraduate health administration programs about the elements of good website design, namely content that is important and relevant to users, site layout appeal, and ease of navigation. Content analyses of undergraduate health administration program websites in 2002 and 2005 assessed both the extent of content from a standard list of twenty-five information elements and usability features of the sites. Implications for improvements to program websites are discussed. PMID:16485784

  11. Economic valuation of acidic deposition damages: Preliminary results from the 1985 NAPAP [National Acid Precipitation Assessment Program] damage assessment

    International Nuclear Information System (INIS)

    This paper identifies methods used to evaluate the economic damages of acid deposition in the 1985 Damage Assessment being coordinated by the National Acid Precipitation Program. It also presents the preliminary estimates of economic damages for the Assessment. Economic damages are estimated for four effect areas: commercial agriculture and forests, recreational fishing and selected types of materials. In all but the last area, methods are used which incorporate the behavioral responses of individuals and firms or simulated physical damages to resources at risk. The preliminary nature of the estimated damages in each area is emphasized. Over all, the damage estimates should be interpreted with caution. 44 refs., 6 figs., 5 tabs

  12. [Environmental Hazards Assessment Program annual report, June 1992--June 1993]. Summer undergraduate research program: Environmental studies

    Energy Technology Data Exchange (ETDEWEB)

    McMillan, J. [ed.

    1993-12-01

    The purpose of the summer undergraduate internship program for research in environmental studies is to provide an opportunity for well-qualified students to undertake an original research project as an apprentice to an active research scientist in basic environmental research. Ten students from throughout the midwestern and eastern areas of the country were accepted into the program. These students selected projects in the areas of marine sciences, biostatistics and epidemiology, and toxicology. The research experience for all these students and their mentors was very positive. The seminars were well attended and the students showed their interest in the presentations and environmental sciences as a whole by presenting the speakers with thoughtful and intuitive questions. This report contains the research project written presentations prepared by the student interns.

  13. Assessment model validity document. NAMMU: A program for calculating groundwater flow and transport through porous media

    International Nuclear Information System (INIS)

    NAMMU is a computer program for modelling groundwater flow and transport through porous media. This document provides an overview of the use of the program for geosphere modelling in performance assessment calculations and gives a detailed description of the program itself. The aim of the document is to give an indication of the grounds for having confidence in NAMMU as a performance assessment tool. In order to achieve this the following topics are discussed. The basic premises of the assessment approach and the purpose of and nature of the calculations that can be undertaken using NAMMU are outlined. The concepts of the validation of models and the considerations that can lead to increased confidence in models are described. The physical processes that can be modelled using NAMMU and the mathematical models and numerical techniques that are used to represent them are discussed in some detail. Finally, the grounds that would lead one to have confidence that NAMMU is fit for purpose are summarised

  14. Kyiv institutional buildings sector energy efficiency program: Lending and implementation assessment

    Energy Technology Data Exchange (ETDEWEB)

    Secrest, T.J.; Freeman, S.L. [Pacific Northwest National Lab., Richland, WA (United States); Popelka, A. [Tysak Engineering, Acton, MA (United States); Shestopal, P.A.; Gagurin, E.V. [Agency for Rational Energy Use and Ecology, Kyiv (Ukraine)

    1997-08-01

    The government of Ukraine, through the State Committee of Energy Conservation (State Committee), is considering the implementation of energy efficiency measures in state and municipal institutional buildings in the city of Kyiv. The State Committee entered into a Memorandum of Cooperation with the US Department of Energy (DOE) to conduct an assessment of the institutional buildings sector efficiency potential. This assessment will be used to support a potential loan by the World Bank for implementing a buildings efficiency improvement program in Kyiv. This report provides an assessment of the options for structuring the lending scenarios and the implementation of the program. Components to the lending structure are options for the disbursement of funds, options for the loan service, and other financial options and considerations. Program implementation includes management structures, reporting, installation activities, and post-installation activities such as training and verification.

  15. Assessment model validity document. NAMMU: A program for calculating groundwater flow and transport through porous media

    Energy Technology Data Exchange (ETDEWEB)

    Cliffe, K.A.; Morris, S.T.; Porter, J.D. [AEA Technology, Harwell (United Kingdom)

    1998-05-01

    NAMMU is a computer program for modelling groundwater flow and transport through porous media. This document provides an overview of the use of the program for geosphere modelling in performance assessment calculations and gives a detailed description of the program itself. The aim of the document is to give an indication of the grounds for having confidence in NAMMU as a performance assessment tool. In order to achieve this the following topics are discussed. The basic premises of the assessment approach and the purpose of and nature of the calculations that can be undertaken using NAMMU are outlined. The concepts of the validation of models and the considerations that can lead to increased confidence in models are described. The physical processes that can be modelled using NAMMU and the mathematical models and numerical techniques that are used to represent them are discussed in some detail. Finally, the grounds that would lead one to have confidence that NAMMU is fit for purpose are summarised.

  16. Real-time analyses and precautionary action. The program system for assessing and limiting radiological consequences

    International Nuclear Information System (INIS)

    AUTOPARK is a mostly automatically running program system which during intensive operation of IMIS provides large-scale assessments of nuclide-specific contamination of soils and 20 plants. Based on calculation results, the potential radiation exposure of the population to ten relevant radionuclides is assessed; contaminations of food to be expected are forecast, and the effects of the emergency measures 'recommendation to stay indoors' and 'marketing ban on higher contaminated food' are investigated. DIAPARK is a dialogue-controlled program system which, on the basis of the depositions on soil and plants calculated by AUTOPARK, enables the study of specific questions, such as the effects of changed feed compositions for useful animals. The DOSISPARK program was developed to assess potential radiation exposure of the population by means of meaasuring data acquired during normal operation of IMIS. (orig./DG)

  17. Vogtle Unit 1 readiness review: Assessment of Georgia Power Company readiness review pilot program

    International Nuclear Information System (INIS)

    Georgia Power Company (GPC) performed a readiness review at Vogtle Unit 1 as a pilot program. The pilot program was a new and innovative approach for the systematic and disciplined review, with senior management involvement, of GPC's implementation of design, construction, and operational readiness processes. The program's principal objective was to increase the level of assurance that quality programs at Vogtle Unit 1 have been accomplished in accordance with regulatory requirements. This report assesses the effectiveness of the GPC's readiness review pilot program (RRPP) at Vogtle Unit 1. It includes (1) an overview of what was experienced during the program's implementation, (2) an assessment of how well program objectives were met, and (3) lessons learned on the future use of the readiness review concept. Overall, GPC and the NRC staff believe that the RRPP at Vogtle Unit 1 was a success and that the program provided significant added assurance that Vogtle Unit 1 licensing commitments and NRC regulations have been adequately implemented. Although altering the NRC licensing review process for the few plants still in the construction pipeline may not be appropriate, licensees may benefit significantly by performing readiness reviews on their own initiative as GPC did for Vogtle. (7 refs.)

  18. A directory of computer programs for assessment of radioactive waste disposal in geological formations

    International Nuclear Information System (INIS)

    This Directory describes computer programs suitable for the assessment of radioactive waste disposal facilities in geological formations. The programs, which are mainly applicable to the post closure analysis of the repository, address combinations of the following topics: nuclide inventory, corrosion, leaching, geochemistry, stress analysis, heat transfer, groundwater flow and radionuclide transport. Biosphere modelling, surface water flow and risk analysis are not covered. A total of 248 programs are identified, of which 50 are reviewed in detail, 134 in summary and 64 in tabular fashion. The directory has been compiled using a combination of literature searches, telephone and postal correspondence and meetings with recognised experts in the respective areas of work covered. It differs from previous reviews of computer programs for similar topics areas in two main respects. Firstly, the method of obtaining information has resulted in program descriptions of considerable breadth and detail. Secondly, the Directory has concentrated wherever possible on European codes, whereas most previous work of this nature has looked solely at programs developed in North America. The reviews are presented in good faith, but it has not been possible to run any of the programs on a computer, and so truly objective comparisons may not be made. Finally, although the Directory is specific to the post-closure assessment of a repository site, some of the programs described could also be used in other areas of repository analysis (eg repository design)

  19. 45 CFR 287.130 - Can NEW Program activities include job market assessments, job creation and economic development...

    Science.gov (United States)

    2010-10-01

    ... Program Design and Operations § 287.130 Can NEW Program activities include job market assessments, job... 45 Public Welfare 2 2010-10-01 2010-10-01 false Can NEW Program activities include job market assessments, job creation and economic development activities? 287.130 Section 287.130 Public...

  20. In Situ Remediation Integrated Program, Evaluation and assessment of containment technology

    International Nuclear Information System (INIS)

    The In Situ Remediation Integrated Program (ISRIP) was established by the US Department of Energy (DOE) to advance the state-of-the art of innovative in situ remediation technologies to the point of demonstration and to broaden the applicability of these technologies to the widely varying site remediation requirements throughout the DOE complex. This program complements similar ongoing integrated demonstration programs being conducted at several DOE sites. The ISRIP has been conducting baseline assessments on in situ technologies to support program planning. Pacific Northwest Laboratory conducted an assessment and evaluation of subsurface containment barrier technology in support of ISRIP's Containment Technology Subprogram. This report summarizes the results of that activity and provides a recommendation for priortizing areas in which additional research and development is needed to advance the technology to the point of demonstration in support of DOE's site restoration activities

  1. An Evaluation of Gamification to Assess Students’ Learning on Their Understanding of First Year Computer Science Programming Module

    OpenAIRE

    Gebremichael, Daniel

    2016-01-01

    This research examines the use of gamification to develop an assessment tool, to assess students’ learning of a first year computer science module. The students’ undertaking of the first semester Programming and Algorithms module in 2015 were assessed on their knowledge of the programming language Python. The incorporation of gamification when assessing students can have various potential benefits. The research aims to identify these benefits and issues. Assessments and games have almost oppo...

  2. TU-C-17A-06: Evaluating IMRT Plan Deliverability Via PTV Shape and MLC Motion

    Energy Technology Data Exchange (ETDEWEB)

    McGurk, R [NC Cancer Hospital, Chapel Hill, NC (United States); Smith, VA [University of North Carolina at Chapel Hill, Chapel Hill, NC (United States); Price, M [NC Cancer Hospital, Chapel Hill, NC (United States); UNC School of Medicine, Chapel Hill, NC (United States)

    2014-06-15

    Purpose: For step-and-shoot intensity-modulated radiation therapy (IMRT) plans, the dosimetry and deliverability can be affected by the number and shape of the segments used. Thus, plan deliverability is likely related to target volume and shape. We investigated whether the sphericity of target volumes and the previously proposed Modulation Complexity Score (MCS) could be used together to improve the detection of IMRT fields that failed quality assurance (QA). Methods: 526 and 353 IMRT fields from 32 prostate and 28 head-and-neck (H'N) patients, respectively, were analyzed. MCS was used to quantify the complexity of multi-leaf collimator shapes and motion patterns for each field. Sphericity was calculated using the surface area and volume of each patient’s planning target volume (PTV). Logistic regression models with MCS-alone or MCS and sphericity terms were fit to PlanUNC IMRT pass/fail results (5% dose difference, 4mm distance-to-agreement criteria) using SAS 9.3 (Cary, NC). Model concordance, discordance and area under the curve (AUC) were used to quantify model accuracy. Results: Mean (±1 standard deviation) MCS for prostate and H'N were 0.58(±0.15) and 0.40 (±0.14), respectively. Mean sphericity scores were 0.75(±0.05) for prostate and 0.63 (±0.12) for H'N. Both metrics were significantly different between treatment locations (p<0.01, Wilcoxon Rank Sum Test) indicating greater complexity in shape and variations for H'N PTVs. For prostate, concordance, discordance and AUC using MCS alone were 80.8%, 18.7% and 0.811. Including sphericity in the model improved these to 81.7%, 17.7% and 0.820. For H'N, the original concordance, discordance and AUC were of 72.9%, 26.9% and 0.729. Including sphericity into the model improved these metrics to 76.5%, 23.2% and 0.729. Conclusion: Sphericity provides a quantitative measure of PTV shape. While improvement in IMRT QA failure detection was modest for both prostate and H'N plans

  3. 78 FR 31359 - Applications for New Awards; Ehanced Assessment Instruments Grants Program-Enhanced Assessment...

    Science.gov (United States)

    2013-05-23

    ... domains of language and literacy development, cognition and general knowledge (including early mathematics... criteria for this program published in the Federal Register on April 19, 2011 (76 FR 21986), and from the..., 2011 (76 FR 21986), and the final priorities, requirement, definitions and selection criteria for...

  4. Risk assessment and analysis of the M109 family of vehicles Fleet Management Pilot Program

    OpenAIRE

    Hitz, Stephen E

    1997-01-01

    Approved for public release; distribution is unlimited. The purpose of this thesis is to conduct a risk assessment and analysis for the M109 l55mm Self Propelled Howitzer (SPH) Fleet Management Pilot Program. The objective of this program is to reengineer the fleet's logistical support system by outsourcing those functions which make sense and that can be performed more efficiently by private industry. This innovative approach places one contractor, or Fleet Manager, in charge of sustainin...

  5. Clinical skills assessment of procedural and advanced communication skills: performance expectations of residency program directors

    OpenAIRE

    Langenau, Erik E.; Zhang, Xiuyuan; Roberts, William L.; Andre F. DeChamplain; Boulet, John R.

    2012-01-01

    Background: High stakes medical licensing programs are planning to augment and adapt current examinations to be relevant for a two-decision point model for licensure: entry into supervised practice and entry into unsupervised practice. Therefore, identifying which skills should be assessed at each decision point is critical for informing examination development, and gathering input from residency program directors is important.Methods: Using data from previously developed surveys and expert p...

  6. Governance and assessment in a widely distributed medical education program in Australia.

    Science.gov (United States)

    Solarsh, Geoff; Lindley, Jennifer; Whyte, Gordon; Fahey, Michael; Walker, Amanda

    2012-06-01

    The learning objectives, curriculum content, and assessment standards for distributed medical education programs must be aligned across the health care systems and community contexts in which their students train. In this article, the authors describe their experiences at Monash University implementing a distributed medical education program at metropolitan, regional, and rural Australian sites and an offshore Malaysian site, using four different implementation models. Standardizing learning objectives, curriculum content, and assessment standards across all sites while allowing for site-specific implementation models created challenges for educational alignment. At the same time, this diversity created opportunities to customize the curriculum to fit a variety of settings and for innovations that have enriched the educational system as a whole.Developing these distributed medical education programs required a detailed review of Monash's learning objectives and curriculum content and their relevance to the four different sites. It also required a review of assessment methods to ensure an identical and equitable system of assessment for students at all sites. It additionally demanded changes to the systems of governance and the management of the educational program away from a centrally constructed and mandated curriculum to more collaborative approaches to curriculum design and implementation involving discipline leaders at multiple sites.Distributed medical education programs, like that at Monash, in which cohorts of students undertake the same curriculum in different contexts, provide potentially powerful research platforms to compare different pedagogical approaches to medical education and the impact of context on learning outcomes. PMID:22643380

  7. Mixed Waste Integrated Program: A technology assessment for mercury-containing mixed wastes

    International Nuclear Information System (INIS)

    The treatment of mixed wastes must meet US Environmental Protection Agency (EPA) standards for chemically hazardous species and also must provide adequate control of the radioactive species. The US Department of Energy (DOE) Office of Technology Development established the Mixed Waste Integrated Program (MWIP) to develop mixed-waste treatment technology in support of the Mixed Low-Level Waste Program. Many DOE mixed-waste streams contain mercury. This report is an assessment of current state-of-the-art technologies for mercury separations from solids, liquids, and gases. A total of 19 technologies were assessed. This project is funded through the Chemical-Physical Technology Support Group of the MWIP

  8. Guidelines and procedures for the International Code Assessment and Applications Program

    International Nuclear Information System (INIS)

    This document presents the guidelines and procedures by which the International Code Assessment and Applications Program (ICAP) will be conducted. The document summarizes the management structure of the program and the relationships between and responsibilities of the United States Nuclear Regulatory Commission (USNRC) and the international participants. The procedures for code maintenance and necessary documentation are described. Guidelines for the performance and documentation of code assessment studies are presented. An overview of an effort to quantify code uncertainty, which the ICAP supports, is included

  9. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    International Nuclear Information System (INIS)

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab

  10. A state-of-practice survey of policy, plan, and program assessment in Canadian provinces

    International Nuclear Information System (INIS)

    Since the introduction of the 1999 Canadian Cabinet Directive on the environmental assessment of policies, plans, and programs (PPPs), higher-order environmental assessment has been receiving increased attention in Canada. However, while practices and systems are advancing at the federal level, there has been very little attention given to recent developments in PPP assessment at the provincial level. This paper presents the results of a Canada-wide survey of PPP assessment principles and practices in 10 Canadian provincial EA jurisdictions. The findings indicate that there exists considerable variability in the provisions for and practice of PPP assessment amongst Canadian provinces, with only Saskatchewan, Ontario, and Quebec identifying recent practice experience. Included amongst the main barriers to effective implementation at the provincial level are the lack of legislative requirements for strategic EA, and the limited understanding of the nature and benefits of higher-order impact assessment

  11. Suicide Risk Assessment Training for Psychology Doctoral Programs: Core Competencies and a Framework for Training

    OpenAIRE

    Cramer, Robert J.; Johnson, Shara M.; McLaughlin, Jennifer; Rausch, Emilie M.; Conroy, Mary Alice

    2013-01-01

    Clinical and counseling psychology programs currently lack adequate evidence-based competency goals and training in suicide risk assessment. To begin to address this problem, this article proposes core competencies and an integrated training framework that can form the basis for training and research in this area. First, we evaluate the extent to which current training is effective in preparing trainees for suicide risk assessment. Within this discussion, sample and methodological issues are ...

  12. Independent Assessment of Technology Characterizations to Support the Biomass Program Annual State-of-Technology Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Yeh, B.

    2011-03-01

    This report discusses an investigation that addressed two thermochemical conversion pathways for the production of liquid fuels and addressed the steps to the process, the technology providers, a method for determining the state of technology and a tool to continuously assess the state of technology. This report summarizes the findings of the investigation as well as recommendations for improvements for future studies.

  13. AFR spent fuel storage program. Technical progress report, January 1981-March 1981

    International Nuclear Information System (INIS)

    Work on this project is focused on developing design and licensing information for the model facility. Deliverables were submitted to DOE for facility modification, security design, and licensing documentation. Work is essentially complete on the high-density rack design with deliverable planned for April 30, 1981. A continuing program for completion of design and licensing information development was initiated by AGNS in February 1981. Progress to date is satisfactory

  14. Rethinking the Business Model in Construction by the Use of Off-Site System Deliverance: Case of the Shaft Project

    DEFF Research Database (Denmark)

    Thuesen, Christian; Hvam, Lars

    2013-01-01

    literature combined with theories on mass-customization and platform development identifying the optimization of cost and value through the handling of complexity as the central process. This framework is developed in order to analyze a specific case on system deliverances – the prefabrication of...... installation shafts. Findings from the development and production of the installation shaft show that system deliveries represent a promising strategy for moving from red ocean competitive environment with the predominant cost+ business model, to a blue ocean situation in which the competition emerges in the...... constant pursue of value creation and cost reduction. On the basis of that system deliverances represent a promising strategy in the future development and application of off-site manufacturing practices. The application of system deliveries is however demanding as it represents a fundamental shift in the...

  15. Survey Procedures Manual for the Environmental Survey and Site Assessment Program (ESSAP). Revision 10

    International Nuclear Information System (INIS)

    The Environmental Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE) conducts radiological survey activities under a contract with the U. S. Department of Energy (DOE) and for the U.S. Nuclear Regulatory Commission (NRC). ORISE and its programs are operated by Oak Ridge Associated Universities (ORAU) through a contract with DOE. The purpose of this Procedures Manual is to provide a standardized set of procedures that document activities of the program in an auditable manner. These procedures are applicable to both DOE and NRC operations. Procedures presented in this manual are limited to those associated with site survey activities

  16. Environmental hazards assessment program. Summary report, June 23, 1992--September 30, 1997

    International Nuclear Information System (INIS)

    This summary report describes activities and reports for the grant period from June 1992 to September 1997. It reports progress against grant objectives and the Program Implementation Plan published during the first year of the grant program. The program consists of six major elements: (1) public and professional outreach, (2) clinical science, (3) biomedical research, (4) information systems, (5) education, and (6) community development. Research is focused on toxicological and epidemiological investigation into environmental problems that pose a direct risk to human health, and methods to translate basic research into risk assessment and preventive medicine applications for health care providers

  17. Primary calibrations of radionuclide solutions and sources for the EML quality assessment program

    Energy Technology Data Exchange (ETDEWEB)

    Fisenne, I.M. [Dept. of Energy, New York, NY (United States)

    1993-12-31

    The quality assurance procedures established for the operation of the U.S. Department of Energy`s Environmental Measurements Laboratory (DOE-EML`s) Quality Assessment Program (QAP) are essentially the same as those that are in effect for any EML program involving radiometric measurements. All these programs have at their core the use of radionuclide standards for their instrument calibration. This paper focuses on EML`s approach to the acquisition, calibration and application of a wide range of radionuclide sources that are required to meet its programmatic needs.

  18. Program to assess the effects of extraordinary environments on radioactive material shipping systems

    International Nuclear Information System (INIS)

    The highlights of the Transportation System Safety Evaluation (TSSE) Program at Sandia National Laboratories are reviewed and the origins of the program and the relationships to other programs addressing safety concerns are outlined. The areas of current activity in the assessment of possible effects an intentional act or extreme environment could have on nuclear material shipping systems are described. Early information has been obtained on the formation of aerosols, and a significant body of experimentally determined source term data will be available for radiological consequence evaluations

  19. Work plan for the Oak Ridge Reservation ecological monitoring and assessment program

    International Nuclear Information System (INIS)

    This plan describes an approach for developing an ecological monitoring and assessment program (EMAP) for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR). Such a program is required to assess existing ecological risks, to predict changes in those ecological risks from proposed remedial actions, and to monitor the effectiveness of remedial actions in reducing ecological risks. Ecological risk assessments must be based on Reservation-level data for those widespread or wide-ranging plant and animal species that occupy the entire ORR. In recognition of this need, Region 4 of the US Environmental Protection Agency has specifically requested that DOE develop a Reservation-wide monitoring and assessment program. The current strategy distinguishes four types of potentially contaminated areas: (1) source operable units (OUs), which may contain waste disposal areas, (2) groundwater aquifers that are potentially contaminated by source OUs, (3) aquatic integrator OUs which are streams and associated floodplains that drain source OUs, and (4) the terrestrial integrator, which encompasses the Reservation. Source OUs may contain sources of contamination that potentially impact local plant and animal population and communities that are restricted to the areal extent of the OU. Such local impacts must be assessed for each OU. However, these source OUs also contribute to risks within the aquatic OUs and within the Reservation-wide terrestrial ecosystem. Therefore, remedial investigations at source OUs must provide data necessary to support ecological risk assessments at the larger scales

  20. Super-Efficient Refrigerator Program (SERP) evaluation volume 2: Preliminary impact and market transformation assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Conger, R.L.

    1996-08-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. It is one of the first examples of a large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the preliminary impact and market transformation evaluation of SERP ({open_quotes}the Program{close_quotes}). Pacific Northwest National Laboratory (PNNL) conducted this evaluation for the U.S. Department of Energy. This study focuses on the preliminary impact evaluation and market transformation assessment, but also presents limited process evaluation information. It is based on interviews with refrigerator dealers and manufacturers, interviews with utility participants, industry data, and information from the Program administrators. Results from this study complement those from prior process evaluation also conducted by PNNL. 42 refs., 5 figs., 4 tabs.

  1. Program Assessment Report Statement of Findings: Satellite Power Systems Concept Development and Evaluation Program

    Science.gov (United States)

    1980-01-01

    This report states what is known, uncertain, and unknown about the Solar Power Satellite (SPS) concept - collecting solar energy in space and delivering the energy to Earth for the production of baseload electricity. This report discusses the important technical, environmental, and cost goal questions that must be answered prior to making a commitment to the SPS concept. Although significant technological, environmental and economic questions remain to be answered, the preliminary investigations undertaken in the Concept Development and Evaluation Program do provide a basis for a policy decision on further commitment. This report also suggests areas of research and experimentation required to acquire the knowledge by which a series of informed, time-phased decisions may be made concerning the possibility of the SPS concept playing a major role in the United States' energy future.

  2. An editorial approach: Mike Nelson’s corridors and The Deliverance and The Patience

    Directory of Open Access Journals (Sweden)

    Helen Hughes

    2015-06-01

    Full Text Available This essay contrasts the contemporary British artist Mike Nelson’s approach to constructing his large, multi-room installations with his approach to editing the numerous artist books that he has produced since 2000. This comparison reveals several compositional symmetries between the two, namely pertaining to narrative non-linearity and meta-fictionality. The logic of montage is shown to similarly underscore both the books and the installations. This essay argues that the corridors connecting the different rooms of Nelson’s installations function in a similar way to the logic of montage: they play an integral role as the support that binds the structure of the installation (its multiple rooms together as a whole. This essay argues that the corridor is the primary viewing framework of the installation for the viewer, and that this vantage point is significant because the necessarily partial vision of the installation from the space of the corridor demonstrates the logic of installation art more broadly. I conclude by mapping the key compositional elements of Nelson’s artist books onto his installations, taking the 2001 work The Deliverance and The Patience as a case study, to show that the books do not exemplify the artwork as with traditional exhibition catalogues, but rather parallel it. That is, a structural continuity is established between these two facets of his work.

  3. Tribal Wind Assessment by the Eastern Shoshone Tribe of the Wind River Reservation

    Energy Technology Data Exchange (ETDEWEB)

    Pete, Belvin; Perry, Jeremy W.; Stump, Raphaella Q.

    2009-08-28

    The Tribes, through its consultant and advisor, Distributed Generation Systems (Disgen) -Native American Program and Resources Division, of Lakewood CO, assessed and qualified, from a resource and economic perspective, a wind energy generation facility on tribal lands. The goal of this feasibility project is to provide wind monitoring and to engage in preproject planning activities designed to provide a preliminary evaluation of the technical, economic, social and environmental feasibility of developing a sustainable, integrated wind energy plan for the Eastern Shoshone and the Northern Arapahoe Tribes, who resides on the Wind River Indian Reservation. The specific deliverables of the feasibility study are: 1) Assessments of the wind resources on the Wind River Indian Reservation 2) Assessments of the potential environmental impacts of renewable development 3) Assessments of the transmission capacity and capability of a renewable energy project 4) Established an economic models for tribal considerations 5) Define economic, cultural and societal impacts on the Tribe

  4. JPI Oceans Concerted support action deliverable 5.1 'Mapping and preliminary analysis of policy needs for evidence'

    OpenAIRE

    Redd, Thomas; Wood, Jacky; Foden, Jo; Mills, David; Bonne, Wendy

    2014-01-01

    CSA Oceans preliminary analysis of policy needs CSA Oceans has completed its preliminary analysis of policy needs. The public deliverable reports on the current status of marine and maritime policies relevant to JPI Oceans and identifies examples of science to policy mechanisms. The report uses stakeholder input to identify the needs of different policies to fulfil their objectives. One of the underlying issues is thought to be a lack of integration between marine and maritime activi...

  5. Analysis of the Baseline Assessments Conducted in 35 U.S. State/Territory Emergency Management Programs: Emergency Management Accreditation Program (EMAP) 2003-2004

    OpenAIRE

    Lucus, Valerie CEM, CBCP

    2006-01-01

    The Emergency Management Accreditation Program (EMAP) is a non profit organization developed to accredit government emergency management programs in the 56 U.S. states and territories. This accreditation model is based on the NFPA 1600 Standard on Disaster/Emergency Management and Business Continuity Programs. In 2003, the Federal Emergency Management Agency funded EMAP to conduct baseline assessments of each U.S. state and territory to assess their emergency management capabilities. Between ...

  6. Technology-Based Orientation Programs to Support Indoor Travel by Persons with Moderate Alzheimer's Disease: Impact Assessment and Social Validation

    Science.gov (United States)

    Lancioni, Giulio E.; Perilli, Viviana; O'Reilly, Mark F.; Singh, Nirbhay N.; Sigafoos, Jeff; Bosco, Andrea; Caffo, Alessandro O.; Picucci, Luciana; Cassano, Germana; Groeneweg, Jop

    2013-01-01

    The present study (a) extended the assessment of an orientation program involving auditory cues (i.e., verbal messages automatically presented from the destinations) with five patients with Alzheimer's disease, (b) compared the effects of this program with those of a program with light cues (i.e., a program in which strobe lights were used instead…

  7. Environmental Assessment : Proposed cooperative state-managed Canada Goose Hunting Program on the Ottawa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Environmental Assessment for the proposed Canada Goose Hunting Program on Ottawa NWR provides descriptions of the program and the environment, summarizes the...

  8. Hawaii Geothermal Resource Assessment Program: western state cooperative direct heat resource assessment, Phase I. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    A regional geothermal resource assessment has been conducted for the major islands in the Hawaiian chain. The assessment was made through the compilation and evaluation of the readily accessible geological, geochemical, and geophysical data for the Hawaiian archipelago which has been acquired during the last two decades. The geologic criteria used in the identification of possible geothermal reservoirs were: age and location of most recent volcanism on the island and the geologic structure of each island. The geochemical anomalies used as traces for geothermally altered ground water were: elevated silica concentrations and elevated chloride/magnesium ion ratios. Geophysical data used to identify subsurface structure which may have geothermal potential were: aeromagnetic anomalies, gravity anomalies, and higher than normal well and basal spring discharge temperatures. Geophysical and geochemical anomalies which may be the result of subsurface thermal effects have been identified on the islands of Hawaii, Maui, Molokai and Oahu.

  9. Jersey: Financial Sector Assessment Program Update: Detailed Assessment of Observance of AML/CFT

    OpenAIRE

    International Monetary Fund

    2009-01-01

    Jersey has put in place a comprehensive and robust Antimoney Laundering/Combating the Financing of Terrorism (AML/CFT) legal framework with a high level of compliance with almost all aspects of the Financial Action Task Force recommendations. The paper discusses a Detailed Assessment of Observance of AML/CFT report on Jersey. Both money laundering and financing of terrorism are criminalized largely in line with the international standard, and Jersey has implemented the provisions effectively.

  10. Strategic Environmental Research and Development Program: Atmospheric Remote Sensing and Assessment Program -- Final Report. Part 1: The lower atmosphere

    Energy Technology Data Exchange (ETDEWEB)

    Tooman, T.P. [ed.] [Sandia National Labs., Livermore, CA (United States). Exploratory Systems Technology Dept.

    1997-01-01

    This report documents work done between FY91 and FY95 for the lower atmospheric portion of the joint Department of Defense (DoD) and Department of Energy (DOE) Atmospheric Remote Sensing and Assessment Program (ARSAP) within the Strategic Environmental Research and Development Program (SERDP). The work focused on (1) developing new measurement capabilities and (2) measuring atmospheric heating in a well-defined layer and then relating it to cloud properties an water vapor content. Seven new instruments were develop3ed for use with Unmanned Aerospace Vehicles (UAVs) as the host platform for flux, radiance, cloud, and water vapor measurements. Four major field campaigns were undertaken to use these new as well as existing instruments to make critically needed atmospheric measurements. Scientific results include the profiling of clear sky fluxes from near surface to 14 km and the strong indication of cloudy atmosphere absorption of solar radiation considerably greater than predicted by extant models.

  11. Development of assessment model for demand-side management investment programs in Korea

    International Nuclear Information System (INIS)

    The goal of this study is the development of the assessment model for demand-side management investment programs (DSMIPs) in the areas of natural gas and district heating. Demand-side management (DSM) is the process of managing the consumption of energy to optimize available and planned generation resources and DSMIPs are the actions conducted by energy suppliers to promote investment in the DSM. In this research, the analytic hierarchy process (AHP) method was used to develop a scientific and rational assessment model for DSMIPs. To apply the AHP method, assessment indicators for the assessment have been identified by using the concept of 'plan, do, see' and the decision-making hierarchy was established. Then AHP model was developed to set up the priorities of assessment indicators and a survey of experts from government and energy suppliers was carried out. Finally, the priorities of assessment indicators were calculated based on the result of survey using the AHP method. The assessment model developed from this research will actually be used to assess the results of DSMIPs, which is being carried out by Korea gas corporation (KOGAS) and Korea district heating corporation (KDHC). The use of the assessment model developed by this research is expected to contribute to enhance efficiency in planning, execution, and assessment of DSMIPs

  12. Liquefied Gaseous Fuels Safety and Environmental Control Assessment Program: second status report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    This document is arranged in three volumes and reports on progress in the Liquefied Gaseous Fuels (LGF) Safety and Environmental Control Assessment Program made in fiscal Year (FY)-1979 and early FY-1980. Volume 3 contains reports from 6 government contractors on LPG, anhydrous ammonia, and hydrogen energy systems. Report subjects include: simultaneous boiling and spreading of liquefied petroleum gas (LPG) on water; LPG safety research; state-of-the-art of release prevention and control technology in the LPG industry; ammonia: an introductory assessment of safety and environmental control information; ammonia as a fuel, and hydrogen safety and environmental control assessment.

  13. Assessment of teachers' ability to integrate science concepts into secondary agriculture programs

    Science.gov (United States)

    Scales, Jason A.

    For the past two decades, the idea of integrating more science concepts into the agricultural education curriculum has been gaining support. The purposes of this study were two fold: (1) To assess the knowledge base and interest levels among agriculture instructors in teaching concepts related to science; (2) To assess how such a change in the curriculum would impact current agricultural education programs. The sample was derived from the population of agriculture instructors teaching in Missouri secondary schools. For this descriptive correlational research, an instrument was developed to assess the instructors' perceived level of competence to teach selected science grade level expectations (GLE) and their relationship to the agricultural education curriculum and programs. A second instrument, solicited from the American Board for Certification in Teacher Excellence, was used to assess the general biological science knowledge of the teachers. Agriculture instructors perceive that they are competent to teach and integrate science GLEs into the agriculture curriculum. However, their scores on the examination of knowledge of biological science brings into question their competence to teach this subject matter. Teachers believe integrating science into the agriculture curriculum will benefit their program and their students; however, they unsure if their classes should count for science credit or if FFA programs and activities are a good match for a more science-based curriculum.

  14. Soil Investigations. Grade 3 Science. Maryland School Performance Assessment Program (MSPAP): Resource Library. Public Release Task.

    Science.gov (United States)

    Maryland State Dept. of Education. Baltimore. Div. of Planning, Results and Information Management.

    One component of the Maryland School Performance Program (MSPAP) is the state's performance-based assessments, criterion-referenced tests that require students to apply what they know and can do to solve problems and display other higher-order thinking skills. This document helps parents, teachers, students, and other citizens understand the tasks…

  15. Concrete Steps for Assessing the "Soft Skills" in an MBA Program

    Science.gov (United States)

    Ingols, Cynthia; Shapiro, Mary

    2014-01-01

    In 2006, our School of Management began the serious path of assessing both the "hard skills" (such as accounting, finance, and strategy) and the "soft skills" (such as leadership, team work, and ethics) of our MBA Program. The data generated from examining the "soft skills" that we want students to learn within our…

  16. The New Jersey Statewide Writing Assessment Program Staff Development Guide and Reference Handbook.

    Science.gov (United States)

    Braungart, Diane S.

    Intended for writing teachers and administrators of writing programs, this handbook is both an information source and a model for a staff development workshop on writing assessment. Section I reviews the history of the New Jersey Statewide Writing Test, while Section II describes the test format, content, and reporting procedures. After an…

  17. Formative and Summative Portfolio Assessment in a Preservice Secondary Mathematics Teacher Education Program.

    Science.gov (United States)

    Erickson, Dianne K.; Niess, Margaret L.; Gfeller, Mary K.

    This paper describes the use of portfolios to assess the preservice teacher's knowledge growth in teaching mathematics during a one year graduate-level teacher preparation program at Oregon State University. Portfolios provided evidence of what the preservice teacher used to show development of competency in knowledge and skill of teaching.…

  18. Biological assessment: water hyacinth control program for the Sacramento/ San Joaquin River Delta of California

    Science.gov (United States)

    A detailed Biological Assessment was developed for the proposed Areawide Water Hyacinth Control Program to outline the procedures that will be used to control this invasive aquatic plant in the Sacramento/ San Joaquin River Delta, and to help determine if this action is expected to threaten endanger...

  19. Assessing the Need for Community College Baccalaureate Degree Programs in Mississippi

    Science.gov (United States)

    Williams, Johannah Bell

    2010-01-01

    This study involved assessing the professional and personal opinions of Mississippi community college students, faculty and administrators regarding the need for community college baccalaureate degree programs in Mississippi. The goal of this study was to determine if students, faculty and administrators at Mississippi community colleges believed…

  20. Evaluability Assessment Thesis and Dissertation Studies in Graduate Professional Degree Programs

    Science.gov (United States)

    Walser, Tamara M.; Trevisan, Michael S.

    2016-01-01

    Evaluability assessment (EA) has potential as a design option for thesis and dissertation studies, serving as a practical training experience for both technical and nontechnical evaluation skills. Based on a content review of a sample of EA theses and dissertations from graduate professional degree programs, the authors of this article found that…

  1. Assessment of Adherence to Eating Habit and Exercise Components in a Behavioral Weight Control Program.

    Science.gov (United States)

    Zegman, Marilyn A.

    Although the augmental value of exercise to behavioral weight control programs has been suggested, demonstration of this value is dependent upon an assessment of adherence to change in eating habits and activity patterns. Self-report measures of adherence were obtained from overweight college women undergoing treatment that involved either dietary…

  2. Assessing the effects of USDA conservation programs on ecosystem services provided by wetlands

    Science.gov (United States)

    The Conservation Effects Assessment Project (CEAP) is led by the U.S. Department of Agriculture (USDA) in an effort to quantify the environmental effects of conservation programs and practices on privately owned agricultural landscapes across the United States. CEAP’s approach includes application ...

  3. Assessing Logo Programming among Jordanian Seventh Grade Students through Turtle Geometry

    Science.gov (United States)

    Khasawneh, Amal A.

    2009-01-01

    The present study is concerned with assessing Logo programming experiences among seventh grade students. A formal multiple-choice test and five performance tasks were used to collect data. The results provided that students' performance was better than the expected score by the probabilistic laws, and a very low correlation between their Logo…

  4. Assessment of Native Languages for Food Safety Training Programs for Meat Industry Employees

    Science.gov (United States)

    Olsen, Sherrlyn S.; Cordray, Joseph C.; Sapp, Stephen; Sebranek, Joseph G.; Anderson, Barbara; Wenger, Matt

    2012-01-01

    Challenges arise when teaching food safety to culturally diverse employees working in meatpacking and food manufacturing industries. A food safety training program was developed in English, translated into Spanish, and administered to 1,265 adult learners. Assessments were conducted by comparing scores before and immediately following training.…

  5. Identification, Assessment and Programming System for Students of Limited English Proficiency: A Systems Manual.

    Science.gov (United States)

    Hawaii State Dept. of Education, Honolulu. Office of Instructional Services.

    The Hawaii State Department of Education's compliance plan for serving the special needs of minority students of limited English proficiency includes current policies, procedures, and program implementation specifications. The procedures address: surveys of newly enrolled students, English and native language proficiency assessment, program…

  6. Two economic, energetic, and environmental assessments of the French nuclear program

    International Nuclear Information System (INIS)

    This paper presents two studies, which try to assess the economic, energy and environmental impact of the French nuclear program. First, the two models used are described briefly and then each study is discussed separately. The main results are summarized in the conclusion. (author). 4 refs., 5 tabs., 8 figs

  7. U.S. Global Change Research Program National Climate Assessment Global Change Information System

    Science.gov (United States)

    Tilmes, Curt

    2012-01-01

    The program: a) Coordinates Federal research to better understand and prepare the nation for global change. b) Priori4zes and supports cutting edge scientific work in global change. c) Assesses the state of scientific knowledge and the Nation s readiness to respond to global change. d) Communicates research findings to inform, educate, and engage the global community.

  8. A Needs Assessment for the Introduction of a Food Science Program at the Univ. of Guyana

    Science.gov (United States)

    Morrison, Donna

    2012-01-01

    This research describes the outcome of a needs assessment to determine whether the Univ. of Guyana should introduce a Food Science program. The research design utilized interviews and questionnaires to large manufacturing organizations and agroprocessors to determine if the required skills are available for the manufacturing process. Results…

  9. Research on the Integrated Performance Assessment in an Early Foreign Language Learning Program

    Science.gov (United States)

    Davin, Kristin; Troyan, Francis J.; Donato, Richard; Hellman, Ashley

    2011-01-01

    This article reports on the implementation of the Integrated Performance Assessment (IPA) in an Early Foreign Language Learning program. The goal of this research was to examine the performance of grade 4 and 5 students of Spanish on the IPA. Performance across the three communicative tasks is described and modifications to IPA procedures based on…

  10. Environmental assessment for the satellite power system concept development and evaluation program: atmospheric effects

    Energy Technology Data Exchange (ETDEWEB)

    Rote, D.M.; Brubaker, K.L.; Lee, J.L.

    1980-11-01

    The US Department of Energy (DOE) has undertaken a preliminary, three-year program to investigate the impacts of the construction and operation of a satellite power system, of unprecedented scale. The Department of Energy's program, titled The Concept Development and Evaluation Program, focused its investigations on a Reference System description that calls for the use of either silicon (Si) or gallium aluminum-arsenide (GaAlAs) photovoltaic cells on 60 satellites to be constructed in GEO over a 30-yr period. Rectennas would be constructed on the ground to receive microwave energy from the satellites. Each satellite-rectenna pair is designed to produce 5 GW of power on an essentially continuous basis for use as a baseload power source for an electric power distribution system. The environmental assessment part of the program was divided into five interdependent task areas. The present document constitutes the final technical report on one of the five task areas, the Assessment of the Atmospheric Effects, and as such presents an in-depth summary of work performed during the assessment program. The issues associated with SPS activities in the troposphere are examined. These include tropospheric weather modification related to rectenna operations and rocket launches, and air quality impacts related to rocketlaunch ground clouds. Then progressing upward through the various levels of the atmosphere, the principal middle and upper atmospheric effects associated with rocket effluents are analyzed. Finally, all of the potential SPS atmospheric effects are summarized.

  11. Environmental assessment for the satellite power system concept development and evaluation program: atmospheric effects

    International Nuclear Information System (INIS)

    The US Department of Energy (DOE) has undertaken a preliminary, three-year program to investigate the impacts of the construction and operation of a satellite power system, of unprecedented scale. The Department of Energy's program, titled The Concept Development and Evaluation Program, focused its investigations on a Reference System description that calls for the use of either silicon (Si) or gallium aluminum-arsenide (GaAlAs) photovoltaic cells on 60 satellites to be constructed in GEO over a 30-yr period. Rectennas would be constructed on the ground to receive microwave energy from the satellites. Each satellite-rectenna pair is designed to produce 5 GW of power on an essentially continuous basis for use as a baseload power source for an electric power distribution system. The environmental assessment part of the program was divided into five interdependent task areas. The present document constitutes the final technical report on one of the five task areas, the Assessment of the Atmospheric Effects, and as such presents an in-depth summary of work performed during the assessment program. The issues associated with SPS activities in the troposphere are examined. These include tropospheric weather modification related to rectenna operations and rocket launches, and air quality impacts related to rocketlaunch ground clouds. Then progressing upward through the various levels of the atmosphere, the principal middle and upper atmospheric effects associated with rocket effluents are analyzed. Finally, all of the potential SPS atmospheric effects are summarized

  12. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners.

    Science.gov (United States)

    Springer, Andrew E; Evans, Alexandra E

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning. PMID:27579254

  13. Environmental Hazards Assessment Program annual report, July 1, 1993--June 30, 1994

    International Nuclear Information System (INIS)

    On June 23, 1992, the US Department of Energy (DOE) signed Assistance Instrument Number DE-FG01-92EW50625 with the Medical University of South Carolina (MUSC) to support the Environmental Hazards Assessment Program (EHAP). The objectives of the EHAP program stated in the proposal to DOE are to: (1) Develop a holistic, national basis for risk assessment, risk management, and risk communication which recognizes the direct impact of environmental hazards on the health and well-being of all. (2) Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the second year of the grant

  14. Environmental Hazards Assessment Program: Annual report, July 1, 1995--June 30, 1996

    International Nuclear Information System (INIS)

    The objectives of the Environmental Hazards Assessment Program (EHAP) are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health-oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the fourth year of the grant. It reports progress against these grant objectives and the Program Implementation Plan

  15. Environmental Hazards Assessment Program annual report, July 1, 1993--June 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-17

    On June 23, 1992, the US Department of Energy (DOE) signed Assistance Instrument Number DE-FG01-92EW50625 with the Medical University of South Carolina (MUSC) to support the Environmental Hazards Assessment Program (EHAP). The objectives of the EHAP program stated in the proposal to DOE are to: (1) Develop a holistic, national basis for risk assessment, risk management, and risk communication which recognizes the direct impact of environmental hazards on the health and well-being of all. (2) Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the second year of the grant.

  16. Inventory of inquiry learning programs - updated version

    OpenAIRE

    Gijlers, Hannie; Dimitrakopoulou, Angelique; De Jong, Ton; Van Joolingen, Wouter

    2005-01-01

    Deliverable 18.1.2 presents the updated version of the inventory of inquiry learning programs of the Computer supported inquiry learning SIG. The aim of the inventory is to develop an exhaustive overview of applications, tools, web environments, and resources in the field of inquiry learning. The complete inventory is available on the website of the SIG (http://kaleidoscope.gw.utwente.nl/SIG.IL/). The present Deliverable (18.1.2) provides a description the changes that have been made and the ...

  17. Environmental Restoration Program waste minimization and pollution prevention self-assessment

    International Nuclear Information System (INIS)

    The Environmental Restoration (ER) Program within Martin Marietta Energy Systems, Inc. is currently developing a more active waste minimization and pollution prevention program. To determine areas of programmatic improvements within the ER Waste Minimization and Pollution Prevention Awareness Program, the ER Program required an evaluation of the program across the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Paducah Environmental Restoration and Waste Minimization Site, and the Portsmouth Environmental Restoration and Waste Minimization Site. This document presents the status of the overall program as of fourth quarter FY 1994, presents pollution prevention cost avoidance data associated with FY 1994 activities, and identifies areas for improvement. Results of this assessment indicate that the ER Waste Minimization and Pollution Prevention Awareness Program is firmly established and is developing rapidly. Several procedural goals were met in FY 1994 and many of the sites implemented ER waste minimization options. Additional growth is needed, however, for the ER Waste Minimization and Pollution Prevention Awareness Program

  18. Heart and liver T2* assessment for iron overload using different software programs

    Energy Technology Data Exchange (ETDEWEB)

    Fernandes, Juliano L. [University of Campinas, Unicamp, Campinas (Brazil); Radiologia Clinica de Campinas, Campinas (Brazil); Cardiology, Department of Internal Medicine, Campinas, SP (Brazil); Sampaio, Erika Fontana; Coelho, Otavio R. [University of Campinas, Unicamp, Campinas (Brazil); Verissimo, Monica; Pereira, Fabricio B. [Centro Infantil Boldrini, Campinas (Brazil); Silva, Jose Alvaro da; Figueiredo, Gabriel S. de; Kalaf, Jose M. [Radiologia Clinica de Campinas, Campinas (Brazil)

    2011-12-15

    To assess the level of agreement and interchangeability among different software programs for calculation of T2* values for iron overload. T2* images were analysed in 60 patients with thalassaemia major using the truncation method in three software programs. Levels of agreement were assessed using Pearson correlation and Bland-Altman plots. Categorical classification for levels of iron concentration by each software program was also compared. For the heart, all correlation coefficients were significant among the software programs (P < 0.001 for all coefficients). The mean differences and 95% limits of agreement were 0.2 (-4.73 to 5.0); 0.1 (-4.0 to 3.9); and -0.1 (-4.3 to 4.8). For the liver all correlations were also significant with P < 0.001. Bland-Altman plots showed differences of -0.02 (-0.7 to 0.6); 0.01 (-0.4 to 0.4); and -0.02 (-0.6 to 0.6). There were no significant differences in clinical classification among the software programs. All tools used in this study provided very good agreement among heart and liver T2* values. The results indicate that interpretation of T2* data is interchangeable with any of the software programs tested. (orig.)

  19. Heart and liver T2* assessment for iron overload using different software programs

    International Nuclear Information System (INIS)

    To assess the level of agreement and interchangeability among different software programs for calculation of T2* values for iron overload. T2* images were analysed in 60 patients with thalassaemia major using the truncation method in three software programs. Levels of agreement were assessed using Pearson correlation and Bland-Altman plots. Categorical classification for levels of iron concentration by each software program was also compared. For the heart, all correlation coefficients were significant among the software programs (P < 0.001 for all coefficients). The mean differences and 95% limits of agreement were 0.2 (-4.73 to 5.0); 0.1 (-4.0 to 3.9); and -0.1 (-4.3 to 4.8). For the liver all correlations were also significant with P < 0.001. Bland-Altman plots showed differences of -0.02 (-0.7 to 0.6); 0.01 (-0.4 to 0.4); and -0.02 (-0.6 to 0.6). There were no significant differences in clinical classification among the software programs. All tools used in this study provided very good agreement among heart and liver T2* values. The results indicate that interpretation of T2* data is interchangeable with any of the software programs tested. (orig.)

  20. A risk communication case study: the Nevada risk assessment/management program

    International Nuclear Information System (INIS)

    The Nevada Risk Assessment/Management Program (NRAMP) is part of a national effort by the U.S. Department of Energy (DOE) to develop new sources of information and approaches to risk assessment, risk management, risk communication and public outreach as these objectives relate to the ecological and human health effects of radioactive and hazardous material management and site remediation activities. This paper reviews the innovation behind the NRAMP project and presents a synopsis of the NRAMP effort which occurred from 1995 to 2000. The primary goals of the DOE in awarding the cooperative agreement establishing NRAMP were to (I) use a risk-based approach to evaluate the consequences of alternative actions in DOE's Environmental Remediation Programs at sites in Nevada and (2) use a neutral and credible institution outside the DOE to perform the risk assessments and contribute to public education about environmental management issues at the Nevada Test Site. (author)

  1. The assessment report of QA program through the analysis of quality trend in 1994

    International Nuclear Information System (INIS)

    Effectiveness and adequacy of KAERI Qualify Assurance Program is assessed through the analysis of quality trend. As a result of assessment, Quality Assurance System for each project has reached the stage of stabilization, and especially, significant improvement of the conformance to QA procedure, the control of QA Records and documents and the inspiration of quality mind for the job has been made. However, some problems discovered in this trend analysis, ie, improvement of efficiency of quality training and economies of design verification system, are required to take preventive actions and consider appropriate measures. In the future, QA is expected to be a support to assurance of nuclear safety and development of advanced technology by making it possible to establish the best quality system suitable for our situation, based on the assessment method for quality assurance program presented in this study. 5 figs., 30 tabs. (Author)

  2. The assessment report of QA program through the analysis of quality trend in 1994

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yung Se; Hong, Kyung Sik; Park, Sang Pil; Park, Kun Woo [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-04-01

    Effectiveness and adequacy of KAERI Qualify Assurance Program is assessed through the analysis of quality trend. As a result of assessment, Quality Assurance System for each project has reached the stage of stabilization, and especially, significant improvement of the conformance to QA procedure, the control of QA Records and documents and the inspiration of quality mind for the job has been made. However, some problems discovered in this trend analysis, ie, improvement of efficiency of quality training and economies of design verification system, are required to take preventive actions and consider appropriate measures. In the future, QA is expected to be a support to assurance of nuclear safety and development of advanced technology by making it possible to establish the best quality system suitable for our situation, based on the assessment method for quality assurance program presented in this study. 5 figs., 30 tabs. (Author).

  3. A Retrospective Self-Assessment of the SURFO Summer Internship Program in Oceanography

    Science.gov (United States)

    Pockalny, R. A.; Donohue, K. A.; Fliegler, J.

    2009-12-01

    The Summer Undergraduate Research Fellowships in Oceanography (SURFO) program at the Graduate School of Oceanography/University of Rhode Island is an NSF-funded Research Experience for Undergraduates site program with a programmatic research niche focused on quantitative aspects of Oceanography. Each summer-cohort includes 9-12 participants (rising seniors) who are paired with a primary research advisor and often with a graduate student mentor. The primary components of the 10-week program include a 4-week introductory phase and a 6-week core research phase. A retrospective self-assessment instrument gauged the confidence, attitude and comfort level of participants with; 1) core math and science subjects, 2) oceanography-related subjects, 3) research skills, and 4) SURFO and GSO staff. SURFO participants evaluated themselves at the start of the program, after the introductory phase, and at the end of the program. Participants were also asked to reassess their initial evaluations and provide an updated score. The pre-assessment results indicate that the program recruits students from the target group (e.g., strong physics and math backgrounds, but with limited exposure to oceanography). The results also indicate that the students are initially comfortable with their advising team, but not so comfortable with their research topic and research skills. The post-introductory phase results indicate large increases in comfort level with the advising team and the local research community yet little or no change is indicated for research skills. The final assessments show large changes in oceanography-content knowledge, research topic, and research skills. The retrospective reassessment indicates an initial overconfidence in most categories. Overall, the largest changes occurred during the core research portion of the program. These results reinforce the importance/effectiveness of authentic, hands-on, inquiry-based research for higher learning and training the next

  4. Bioclim Deliverable D6a: regional climatic characteristics for the European sites at specific times: the dynamical down-scaling

    International Nuclear Information System (INIS)

    The overall aim of BIOCLIM is to assess the possible long-term impacts due to climate change on the safety of radioactive waste repositories in deep formations. This aim is addressed through the following specific objectives: - Development of practical and innovative strategies for representing sequential climatic changes to the geosphere-biosphere system for existing sites over central Europe, addressing the timescale of one million years, which is relevant to the geological disposal of radioactive waste. - Exploration and evaluation of the potential effects of climate change on the nature of the biosphere systems used to assess the environmental impact. - Dissemination of information on the new methodologies and the results obtained from the project among the international waste management community for use in performance assessments of potential or planned radioactive waste repositories. The BIOCLIM project is designed to advance the state-of-the-art of biosphere modelling for use in Performance Assessments. Therefore, two strategies are developed for representing sequential climatic changes to geosphere-biosphere systems. The hierarchical strategy successively uses a hierarchy of climate models. These models vary from simple 2-D models, which simulate interactions between a few aspects of the Earth system at a rough surface resolution, through General Circulation Model (GCM) and vegetation model, which simulate in great detail the dynamics and physics of the atmosphere, ocean and biosphere, to regional models, which focus on the European regions and sites of interest. Moreover, rule-based and statistical down-scaling procedures are also considered. Comparisons are provided in terms of climate and vegetation cover at the selected times and for the study regions. The integrated strategy consists of using integrated climate models, representing all the physical mechanisms important for long-term continuous climate variations, to simulate the climate evolution over

  5. Bioclim Deliverable D3: global climatic features over the next million years and recommendation for specific situations to be considered

    International Nuclear Information System (INIS)

    The BIOCLIM project aims at assessing the possible long-term impacts of climate change on the safety of waste repositories in deep formations using climate simulations of the long-term climate in various European areas. One of the objectives of the project is to develop two strategies for representing sequential climatic changes to the geosphere-biosphere system for different sites over Europe, addressing the time scale of one million years. The results of this work will be interpreted in terms of global or regional changes of climate and of vegetation. The first strategy (hierarchical strategy) will use the full hierarchy of existing climate models (a climate model is a numerical simplified representation of the climate system behaviour and evolution). Simple models (LLN 2-D NH and threshold models; see the description here after) will simulate the overall long-term evolution of the global climate. Their results will then be used as inputs to more complex models (LMD climate models possibly coupled with vegetation models, either SECHIBA or ORCHIDE) and finally climate and vegetation cover will be determined for specific sites at specific times. A second strategy (integrated strategy) will consist in building an integrated climate model, which represents most of the physical mechanisms for studying long-term climatic variations. The results will then be interpreted on a regional scale. This deliverable is the first step of the hierarchical strategy. The purpose of this deliverable is to identify and justify some specific climatic situations amongst different long-term simulations that are of interest for assessing the safety of radioactive waste repository sites and that will be further studied with GCMs (General Circulation Model). The simple threshold (or multi-state) climate model is a modified version of the model from Paillard. It describes the time evolution of the ice volume and the CO2 concentration. It has two distinct regimes (interglacial and glacial

  6. Integrated safety assessment report, Haddam Neck Plant (Docket No. 50-213): Integrated Safety Assessment Program: Draft report

    International Nuclear Information System (INIS)

    The integrated assessment is conducted on a plant-specific basis to evaluate all licensing actions, licensee initiated plant improvements and selected unresolved generic/safety issues to establish implementation schedules for each item. Procedures allow for a periodic updating of the schedules to account for licensing issues that arise in the future. The Haddam Neck Plant is one of two plants being reviewed under the pilot program. This report indicates how 82 topics selected for review were addressed, and presents the staff's recommendations regarding the corrective actions to resolve the 82 topics and other actions to enhance plant safety. 135 refs., 4 figs., 5 tabs

  7. Conclusions and summaries of feed-back comments from participating countries. Deliverable D18

    International Nuclear Information System (INIS)

    Deliverable 18 is focused on the principal components of risk communication strategies and based on actual experiences from different cultural settings in relation to nuclear waste management (NWM) issues. Essentially it describes how the ideas were presented and developed within the 3rd year of the ARGONA project, in sub-workpackage 4.1. The intention of this work was to delineate good risk communication approaches across national borders, as well as to specify the circumstances that require more specific and unique national or group considerations. Our aim was to provide an in-depth analysis of societal patterns and trends regarding the management of nuclear wastes on the basis of a number of individual participants' understanding and open discussion of the issue between themselves and across the heterogeneous groups represented. To meet these goals we involved a number of stakeholders from ARGONA participating countries (UK, Sweden, Slovakia, Czech Republic) in a one-day focus group in September 2009. Their task was to provide comments on the strategies for risk communication that have emanated from the various interest groups within the different countries. Another reason for their engagement was to elicit their comments on the central features of existing materials and thus point to any strengths and weaknesses associated with various risk communication techniques and more composite risk communication strategies. The results obtained reflect the opinions and sentiments related to risks and safety of various groups in civil society within the participating countries. We also believe that the work performed in D18 fits well into the transparency framework provided in the RISCOM model. This model was successfully used in Sweden and has actually also been applied in the Czech Republic within the ARGONA project. It was shown that if applied in practice this model has a high potential for improving transparency related to consensus building in the NWM area

  8. A new approach to assess student perceptions of gains from an REU program

    Science.gov (United States)

    Houser, C.; Cahill, A. T.; Lemmons, K.

    2013-12-01

    Research Experience for Undergraduate (REU) programs are designed to recruit students to science and engineering research careers by allowing the students to conduct research with faculty mentors. The success of REU programs is commonly assessed based on student perceptions of gains using a simple Likert scale. Because students tend to be positive about all aspects of their research experience, the results of the Likert scale tend to be meaningless. An alternative assessment technique, similar to Q-analysis, is used to assess the perceived outcomes of an international REU program hosted by Texas A&M University. Students were required to sort commonly identified REU outcomes into a normal distribution, from most agree to least agree, based on what they perceive as their personal gains from the program. Factor analysis reveals 3 groups of students who believe that they gained field and analytical skills (Group 1), greater competence in research and self-confidence (Group 2), and an improved understanding of the scientific method (Group 3). Student perceptions appear to depend on whether the student had previous research experience through classes and/or as a research assistant at their home institution. A comparison to a similar sort of REU outcomes by the faculty mentors suggests that there is a slight disconnect in the perceived gains by the students between the student participants and the faculty mentors.

  9. Supplemental Assessment of the Y-12 Groundwater Protection Program Using Monitoring and Remediation Optimization System Software

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental LLC; GSI Environmental LLC

    2009-01-01

    A supplemental quantitative assessment of the Groundwater Protection Program (GWPP) at the Y-12 National Security Complex (Y-12) in Oak Ridge, TN was performed using the Monitoring and Remediation Optimization System (MAROS) software. This application was previously used as part of a similar quantitative assessment of the GWPP completed in December 2005, hereafter referenced as the 'baseline' MAROS assessment (BWXT Y-12 L.L.C. [BWXT] 2005). The MAROS software contains modules that apply statistical analysis techniques to an existing GWPP analytical database in conjunction with hydrogeologic factors, regulatory framework, and the location of potential receptors, to recommend an improved groundwater monitoring network and optimum sampling frequency for individual monitoring locations. The goal of this supplemental MAROS assessment of the Y-12 GWPP is to review and update monitoring network optimization recommendations resulting from the 2005 baseline report using data collected through December 2007. The supplemental MAROS assessment is based on the findings of the baseline MAROS assessment and includes only the groundwater sampling locations (wells and natural springs) currently granted 'Active' status in accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP). The results of the baseline MAROS assessment provided technical rationale regarding the 'Active' status designations defined in the MOP (BWXT 2006). One objective of the current report is to provide a quantitative review of data collected from Active but infrequently sampled wells to confirm concentrations at these locations. This supplemental MAROS assessment does not include the extensive qualitative evaluations similar to those presented in the baseline report.

  10. Assessing adverse experiences from infancy through early childhood in home visiting programs.

    Science.gov (United States)

    McKelvey, Lorraine M; Whiteside-Mansell, Leanne; Conners-Burrow, Nicola A; Swindle, Taren; Fitzgerald, Shalese

    2016-01-01

    The general aim of early intervention and home visiting programs is to support families to minimize Adverse Childhood Experiences (ACEs). However, assessing children's exposure to these risks is complicated because parents serve as the conduit for both measurement and intervention. The primary aims of the study were to develop an assessment of children's exposure to ACEs and to examine concurrently measured parental child abuse and neglect potential and child social-emotional functioning. Home visiting programs in a southern state implemented the Family Map Inventories (FMI) as comprehensive family assessment and child screenings (N=1,282) within one month of enrollment. Children (M=33 months of age, SD=20) were exposed at rates of 27% to one, 18% to two, 11% to three, and 12% to four or more FMI-ACEs. FMI-ACEs were associated with increased parental beliefs and behaviors associated with child abuse and neglect. FMI-ACEs also significantly predicted the likelihood of the child having at-risk social-emotional development; children with 4 or more FMI-ACEs were over 6 times more likely than those with none to have at-risk scores. The findings add to our understanding of the negative impact of trauma on children and families. Assessing these risks as they occur in a family-friendly manner provides a platform for early intervention programs to work with families to increase family strengths and reduce the impacts of adverse experiences for their children. PMID:26455263

  11. Assessing Competencies in a Master of Science in Clinical Research Program: The Comprehensive Competency Review.

    Science.gov (United States)

    Robinson, Georgeanna F W B; Moore, Charity G; McTigue, Kathleen M; Rubio, Doris M; Kapoor, Wishwa N

    2015-12-01

    Competencies in Master of Science Clinical Research programs are becoming increasingly common. However, students and programs can only benefit fully from competency-based education if students' competence is formally assessed. Prior to a summative assessment, students must have at least one formative, formal assessment to be sure they are developing competence appropriate for their stage of training. This paper describes the comprehensive competency review (CCR), a milestone for MS students in Clinical Research at the University of Pittsburgh's Institute for Clinical Research Education. The CCR involves metacognitive reflection of the student's learning as a whole, written evidence of each competency, a narrative explaining the choice of evidence for demonstrating competencies, and a meeting in which two faculty members review the evidence and solicit further oral evidence of competence. CCRs allow for individualized feedback at the midpoint in degree programs, providing students with confidence that they will have the means and strategies to develop competence in all areas by the summative assessment of competence at their thesis defense. CCRs have also provided programmatic insight on the need for curricular revisions and additions. These benefits outweigh the time cost on the part of students and faculty in the CCR process. PMID:26332763

  12. EPA's public consultation and communications needs assessment for ITS WIPP outreach program

    International Nuclear Information System (INIS)

    In October, 1992 Congress enacted the Waste Isolation Pilot Plant Land Withdrawal Act (WIPPLWA) which gave the Environmental Protection Agency (EPA) significant new responsibilities for overseeing the Department of Energy's activities at the WIPP. In implementing its new responsibilities, EPA has committed to conducting an open public process that includes interaction with all interested parties. As a first step in meeting its commitment to an open public process, EPA conducted a open-quotes Public Consultation and Communication Needs Assessmentclose quotes in June of 1993. The purpose of the assessment was to obtain input from interest groups and the public on their key issues of concern involving EPA's responsibilities at the WIPP as well as the best methods for communicating with them. First, the Agency needed to learn about the public and its communications needs quickly and efficiently. Second, given the controversy surrounding this project, and what EPA knew of the public's impressions of the federal government, it was clear that the Agency could not afford to make mistakes in its outreach program if it was to establish its credibility with the public in New Mexico. Third, given the public's involvement and familiarity with the program, the Agency recognized that the public in New Mexico could have valuable insights into the program and could make useful contributions to EPA's WIPP oversight program. Finally, given that the Agency has limited resources to devote to public outreach on this project, EPA staff felt that undertaking this needs assessment before developing a communications plan would result in the most cost-effective communications program possible. This paper describes how the Agency conducted this needs assessment and discusses the findings and recommendations that resulted from it. The results of the assessment are being used by EPA as it plans and carries out its WIPP communications and consultation activities

  13. NASA Educational Product Development and Post-Secondary Program Assessment Planning

    Science.gov (United States)

    Salmons, Phyllis A.

    1999-01-01

    Producing "value-added students" involves proactively addressing how successfully students develop their skills, knowledge, and personal, social, and ethical growth due to their association with a program. NASA programs for higher education can certainly be responsive in aiding the academic community strive for quality in terms of "valueadded" students. By identifying essential characteristics of exemplary assessment practices, the standards developed by accrediting agencies serve as guides for developing quality practices and policies. Such a process is an effective tool for communicating the expectations of the educational components of a program to all concerned with the program and its expected results. When standards are connected to student performance, they provide a very compelling argument for refocusing the definition of quality in higher education. By linking standards and performance, student learning and development becomes the starting point for examining program quality. If the multiple stakeholders - faculty, peers, the professional community, addressed assessment issues, then accreditation can be a link among various constituencies, the parties can better understand the needs of each other and develop the necessary trust needed for understanding and support.

  14. Dairy calving management: description and assessment of a training program for dairy personnel.

    Science.gov (United States)

    Schuenemann, G M; Bas, S; Gordon, E; Workman, J D

    2013-04-01

    The objective of this study was to assess the effectiveness of a comprehensive calving management program designed to enhance the flow of applied, research-based, calving information to dairy personnel. Calving personnel (n=70), serving an estimated 18,100 cows from 18 Ohio dairies, attended the calving management program (∼1h of training and ∼2h of demonstration). Description of the birth canal, behavioral signs of normal parturition (stages I to III), dystocia (presentations, positions, and postures), hygiene practices during the assistance procedure, strategies for intervention (when and how to intervene), record-keeping, communication (when to call for help), and newborn care were discussed. Posttraining follow-ups (2/yr) were available for participating personnel. Educational materials were delivered through lectures followed by group discussions and hands-on demonstrations. Attendees were assessed using pre- and posttests of knowledge to determine the level of knowledge gained during the training program. Participants evaluated the program and provided feedback at the conclusion of the program. Dairy personnel reported that the overall program, presentations, and discussions were useful. The presented materials and demonstrations substantially increased the knowledge level of the attendees by 20.9 percentage points from pre- to posttest scores. Importance of open communication within the farm team, recognizing the landmarks for parturition, signs of calving progress, reference times for intervention, hygiene practices at calving, and strategies to correct abnormal presentation, position, or posture were listed as learned concepts with immediate field application. The follow-up assessment with participant personnel revealed that they were able to implement and apply their learned skills, communicate calving records with the farm team, and follow written calving protocols. Results indicated that the workshop was relevant and effective, offering information

  15. Environmental Hazards Assessment Program. Volume 4: Annual report, July 1, 1993--June 30, 1994

    International Nuclear Information System (INIS)

    The Medical University of South Carolina's (MUSC) vision is to become the premier national resource for medical information and for environmental/health risk assessment. A key component to the success of the many missions of the Environmental Hazards Assessment Program (EHAP) is timely access to large volumes of data. The significant growth in the number of environmental/health information systems that has occurred over the past few years has made data access challenging. This study documents the results of the needs assessment effort conducted to determine the information access and processing requirements of EHAP. The following topics are addressed in this report: immunological consequences of beryllium exposure; assessment of genetic risks to environmental diseases; low dose-rate radiation health effects; environmental risk perception in defined populations; information support and access systems; and environmental medicine and risk communication: curriculum and a professional support network-Department of Family Medicine

  16. Environmental Hazards Assessment Program. Volume 4: Annual report, July 1, 1993--June 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Medical University of South Carolina`s (MUSC) vision is to become the premier national resource for medical information and for environmental/health risk assessment. A key component to the success of the many missions of the Environmental Hazards Assessment Program (EHAP) is timely access to large volumes of data. The significant growth in the number of environmental/health information systems that has occurred over the past few years has made data access challenging. This study documents the results of the needs assessment effort conducted to determine the information access and processing requirements of EHAP. The following topics are addressed in this report: immunological consequences of beryllium exposure; assessment of genetic risks to environmental diseases; low dose-rate radiation health effects; environmental risk perception in defined populations; information support and access systems; and environmental medicine and risk communication: curriculum and a professional support network-Department of Family Medicine.

  17. California GAMA Program: A Contamination Vulnerability Assessment for the Bakersfield Area

    Energy Technology Data Exchange (ETDEWEB)

    Moran, J E; Hudson, G B; Eaton, G F; Leif, R

    2004-11-01

    In response to concerns expressed by the California Legislature and the citizenry of the State of California, the State Water Resources Control Board (SWRCB), implemented a program to assess groundwater quality, and provide a predictive capability for identifying areas that are vulnerable to contamination. The program was initiated in response to concern over public supply well closures due to contamination by chemicals such as MTBE from gasoline, and solvents from industrial operations. As a result of this increased awareness regarding groundwater quality, the Supplemental Report of the 1999 Budget Act mandated the SWRCB to develop a comprehensive ambient groundwater-monitoring plan, and led to the initiation of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The primary objective of the GAMA Program is to assess the water quality and to predict the relative susceptibility to contamination of groundwater resources throughout the state of California. Under the GAMA program, scientists from Lawrence Livermore National Laboratory (LLNL) collaborate with the SWRCB, the U.S. Geological Survey (USGS), the California Department of Health Services (DHS), and the California Department of Water Resources (DWR) to implement this groundwater assessment program. In 2003, LLNL carried out this vulnerability study in the groundwater basin that underlies Bakersfield, in the southern San Joaquin Valley. The goal of the study is to provide a probabilistic assessment of the relative vulnerability of groundwater used for the public water supply to contamination from surface sources. This assessment of relative contamination vulnerability is made based on the results of two types of analyses that are not routinely carried out at public water supply wells: ultra low-level measurement of volatile organic compounds (VOCs), and groundwater age dating (using the tritium-helium-3 method). In addition, stable oxygen isotope measurements help determine the recharge water

  18. California GAMA Program: A Contamination Vulnerability Assessment for the Bakersfield Area

    International Nuclear Information System (INIS)

    In response to concerns expressed by the California Legislature and the citizenry of the State of California, the State Water Resources Control Board (SWRCB), implemented a program to assess groundwater quality, and provide a predictive capability for identifying areas that are vulnerable to contamination. The program was initiated in response to concern over public supply well closures due to contamination by chemicals such as MTBE from gasoline, and solvents from industrial operations. As a result of this increased awareness regarding groundwater quality, the Supplemental Report of the 1999 Budget Act mandated the SWRCB to develop a comprehensive ambient groundwater-monitoring plan, and led to the initiation of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The primary objective of the GAMA Program is to assess the water quality and to predict the relative susceptibility to contamination of groundwater resources throughout the state of California. Under the GAMA program, scientists from Lawrence Livermore National Laboratory (LLNL) collaborate with the SWRCB, the U.S. Geological Survey (USGS), the California Department of Health Services (DHS), and the California Department of Water Resources (DWR) to implement this groundwater assessment program. In 2003, LLNL carried out this vulnerability study in the groundwater basin that underlies Bakersfield, in the southern San Joaquin Valley. The goal of the study is to provide a probabilistic assessment of the relative vulnerability of groundwater used for the public water supply to contamination from surface sources. This assessment of relative contamination vulnerability is made based on the results of two types of analyses that are not routinely carried out at public water supply wells: ultra low-level measurement of volatile organic compounds (VOCs), and groundwater age dating (using the tritium-helium-3 method). In addition, stable oxygen isotope measurements help determine the recharge water

  19. Pollution prevention opportunity assessment for Sandia National Laboratories/California recycling programs.

    Energy Technology Data Exchange (ETDEWEB)

    Wrons, Ralph Jordan; Vetter, Douglas Walter

    2007-07-01

    This Pollution Prevention Opportunity Assessment (PPOA) was conducted for the Sandia National Laboratories/California (SNL/CA) Environmental Management Department between May 2006 and March 2007, to evaluate the current site-wide recycling program for potential opportunities to improve the efficiency of the program. This report contains a summary of the information collected and analyses performed with recommended options for implementation. The SNL/NM Pollution Prevention (P2) staff worked with the SNL/CA P2 Staff to arrive at these options.

  20. Assessing the Design of Three Pilot Programs for Carbon Trading in China

    OpenAIRE

    Munnings, Clayton; Morgenstern, Richard; Wang, Zhongmin; Liu, Xu

    2014-01-01

    China started seven carbon cap-and-trade pilot programs in order to inform the development of a future national cap-and-trade market. This paper assesses the design of three of the longer-running cap-and-trade pilot programs in Guangdong, Shanghai and Shenzhen. Based on extensive stakeholder interviews and a detailed literature review we formulate a series of recommendations to improve the design of these three pilots, including: strengthening the legal foundations for the cap-and-trade pilot...