WorldWideScience

Sample records for area management plan

  1. Kirtland's Warbler Wildlife Management Area Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Kirtland's Warbler Wildlife Management Area Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  2. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  3. Amendment I : Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This amendment to the fur management plan for Stillwater Wildlife Management area calls for the annual trapping of beaver. The Lower Carson River is overpopulated...

  4. Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fur management plan for Stillwater Wildlife Management Area outlines methods of fur harvest, trapping territories, selection of trappers, trapping equipment,...

  5. Mixed Waste Focus Area program management plan

    Energy Technology Data Exchange (ETDEWEB)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  6. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  7. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  8. Stillwater Wildlife Management Area : Hunting and fishing plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the 1960 hunting and fishing plan for Stillwater Wildlife Management Area and Fallon National Wildlife Refuge. The plan describes the waterfowl that uses...

  9. Nulhegan Deer Wintering Area Management Plan 1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Within the Nulhegan basin lies the Nulhegan Deer Wintering Area, an approximately 15,000-acre tract of land. In addition to being the largest deer wintering area in...

  10. Underground Test Area Subproject Project Management Plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-03

    This Project Management Plan (PMP) describes the manner in which the US Department of Energy Nevada Operations Office (DOE/NV) will manage the Underground Test Area (UGTA) Subproject at the Nevada Test Site (NTS). It provides the basic guidance for implementation and the organizational structure for meeting the UGTA objectives.

  11. Rainwater Wildlife Area Management Plan : Executive Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

    2002-02-01

    The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Act directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.

  12. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, M.I. [Midwest Technical Inc., Oak Ridge, Tennessee (United States); McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D. [Oak Ridge National Lab., TN (United States)

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections.

  13. Innovation in Management Plans for Community Conserved Areas: Experiences from Australian Indigenous Protected Areas

    Directory of Open Access Journals (Sweden)

    Jocelyn Davies

    2013-06-01

    Full Text Available Increasing attention to formal recognition of indigenous and community conserved areas (ICCAs as part of national and/or global protected area systems is generating novel encounters between the customary institutions through which indigenous peoples and local communities manage these traditional estates and the bureaucratic institutions of protected area management planning. Although management plans are widely considered to be important to effective management of protected areas, little guidance has been available about how their form and content can effectively reflect the distinctive socio-cultural and political characteristics of ICCAs. This gap has been particularly apparent in Australia where a trend to rapidly increased formal engagement of indigenous people in environmental management resulted, by 2012, in 50 indigenous groups voluntarily declaring their intent to manage all or part of their estates for conservation in perpetuity, as an indigenous protected area (IPA. Development and adoption of a management plan is central to the process through which the Australian Government recognizes these voluntary declarations and invests resources in IPA management. We identified four types of innovations, apparent in some recent IPA plans, which reflect the distinctive socio-cultural and political characteristics of ICCAs and support indigenous people as the primary decision makers and drivers of knowledge integration in IPAs. These are (1 a focus on customary institutions in governance; (2 strategic planning approaches that respond to interlinkages of stewardship between people, place, plants, and animals; (3 planning frameworks that bridge scales by considering values and issues across the whole of an indigenous people’s territory; and (4 varied communication modes appropriate to varied audiences, including an emphasis on visual and spatial modes. Further research is warranted into how governance and management of IPAs, and the plans that

  14. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The primary goal of the annual water plan is to set a strategy for the most efficient use of the available water delivered to Stillwater WMA. For all practical...

  15. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The primary goal of the annual water plan is to set a strategy for the 'most efficient use of the available water delivered to Stillwater WMA. For all practical...

  16. Stillwater Wildlife Management Area Populations management : Trapping plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The proposed action is a revision of the 30 year old fur harvesting plan. This includes: 1) The establishment of a trapping permit system for the entire Stillwater...

  17. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  18. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Science.gov (United States)

    2011-06-08

    ... costs of management. Preliminary planning criteria include: 1. Lands addressed in the RMP will be public... Bureau of Land Management Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area in the State of Oregon and Associated Environmental Impact Statement AGENCY:...

  19. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    Science.gov (United States)

    2013-06-14

    ... Planning Area Alaska and Associated Environmental Impact Statement AGENCY: Bureau of Land Management... on issues, planning criteria, and management questions and concerns related to the Central Yukon RMP... wildlife management. 8. The RMP will be consistent with the Bureau's H-1601-1 Land Use Planning...

  20. 77 FR 55224 - Notice of Availability of the Proposed Imperial Sand Dunes Recreation Area Management Plan and...

    Science.gov (United States)

    2012-09-07

    ... soils; mineral resources; socioeconomics; public health and safety; and visual resources. The Proposed... Management Plan and California Desert Conservation Area Plan Amendment/Final Environmental Impact Statement... Management Plan (RAMP) and California Desert Conservation Area (CDCA) Plan Amendment/Final...

  1. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... National Park Service Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National... comment period for Draft Environmental Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan...

  2. Forest Management Plan Area 1 Erie National Wildlife Refuge 1985

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The management objective on Area l at Erie National Wildlife Refuge is to increase forest diversity in order to benefit all indigenous species with primary...

  3. BOEM Wind Planning Areas

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set represents the most recent changes for the Wind Development Planning Areas in the Atlantic. Wind Planning Areas in this dataset represent up to six...

  4. Hunting & Fishing Plan : Patoka River National Wildlife Refuge & Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan provides guidelines for the administration of hunting and fishing activity and for the development, maintenance, and enforcement of regulations and...

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  6. Comparative analysis of management plans of the Marine Protected Areas of four European Atlantic countries

    Directory of Open Access Journals (Sweden)

    Inmaculada Alvarez Fernandez

    2014-05-01

    Full Text Available Management plans for Marine Protected Areas (MPA in four European Atlantic countries (UK, France, Portugal and Spain were analyzed comparatively. The information used in the analysis was related to the development and the content of the plans, as governance, control and enforcement. It was collected through questionnaires from a total of 125 management plans, corresponding to 234 marine protected areas. The overall priority goal in all of the management plans was biodiversity conservation and restoration, except in Spain were management of exploited natural resources was always present as an objective. In general the management plans have more objectives than described in the MPA designation, as to improve environment education and raising of public awareness or to maintain key ecological functions. However these objectives are qualitative in all of the management plans and only 15% of them have quantitative objectives, mainly in France and Portugal. Over 70% of the management plans studied provided a regular monitoring program and approximately half provided indicators to monitor each of the MPA objectives, except in the case of Portugal (15%.

  7. Honey fungus found in the management-plan area Votice

    OpenAIRE

    Holá, Jana

    2014-01-01

    The object of this bachelor work is a study of the common mushroom pest honey fungus (genus Armillaria). The main interest is dedicated to A.ostoyae and its meaning in the forestry on the LHC Votice region. Occurrence of honey fungi and the percentage of its attacks in relation to weather conditions (especially influence of drought) was studied on defined permanent study plots. Simultaneously, monitoring of these fungi occurrence outside the permanent plots in a plan choosing where indiv...

  8. 75 FR 41512 - Draft Environmental Impact Statement/General Management Plan; Ross Lake National Recreation Area...

    Science.gov (United States)

    2010-07-16

    ... National Park Service Draft Environmental Impact Statement/General Management Plan; Ross Lake National...) for Ross Lake National Recreation Area (Ross Lake NRA) in Washington State. Ross Lake NRA is one of... facilities, land protection and boundaries, and long-term operations and management of Ross Lake NRA....

  9. 75 FR 6218 - New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA

    Science.gov (United States)

    2010-02-08

    ... published in the Federal Register on November 2, 2009 (74 FR 56656). The written comment period on the Draft... Bureau of Reclamation New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA... a Final RMP/EIS for the New Melones Lake Area. The Final RMP/EIS describes and presents...

  10. RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area C at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.; Narbutovskih, Susan M.

    2001-01-01

    This document describes the groundwater monitoring plan for Waste Management Area C located in the 200 East Area of the DOE Hanford Site. This plan is required under Resource Conservation and Recovery Act of 1976 (RCRA).

  11. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  12. 75 FR 27286 - McKelvie Geographic Area Range Allotment Management Planning on the Samuel R. McKelvie National...

    Science.gov (United States)

    2010-05-14

    ..., 2010 (FR Vol. 75, No. 48, p. 11882) concerning the range allotment management planning on the McKelvie... Forest Service McKelvie Geographic Area Range Allotment Management Planning on the Samuel R. McKelvie... line: McKelvie Allotment Management Planning DEIS Comments. The public is not required to...

  13. 75 FR 33239 - Rangeland Allotment Management Planning on the Fall River West and Oglala Geographic Areas, Fall...

    Science.gov (United States)

    2010-06-11

    ... Forest Service Rangeland Allotment Management Planning on the Fall River West and Oglala Geographic Areas..., Forest Service, will prepare an environmental impact statement (EIS) analyzing the management of... Forest Revised Land and Resource Management Plan (Forest Plan). A Notice of Intent (NOI) for this...

  14. Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, Patrice Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baumer, Andrew Ronald [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-26

    Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Cañada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste management and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste

  15. 76 FR 36515 - Rangeland Allotment Management Planning on the Fall River and Oglala Geographic Areas, Pine Ridge...

    Science.gov (United States)

    2011-06-22

    ... Forest Service Rangeland Allotment Management Planning on the Fall River and Oglala Geographic Areas... Allotment Management Planning on the Fall River West Geographic Area of the Fall River Ranger District and... prepare an environmental impact statement (EIS) analyzing the management of rangeland vegetation...

  16. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  17. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells

  18. 78 FR 47410 - General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area...

    Science.gov (United States)

    2013-08-05

    ... National Recreation Area, 210 New York Avenue, Staten Island, New York 10305 or telephone at (718) 354-4663... people into the park to increase awareness and enjoyment of Gateway's historic resources and the natural... National Park Service General Management Plan, Draft Environmental Impact Statement, Gateway...

  19. 300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Freshley, Mark D.

    2008-12-31

    Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

  20. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  1. 75 FR 14623 - Notice of Availability of the Draft Imperial Sand Dunes Recreation Area Management Plan and Draft...

    Science.gov (United States)

    2010-03-26

    ...; renewable energy; water resources; geology and soils; mineral resources; socioeconomics; public health and... Management Plan and Draft Environmental Impact Statement and Associated Amendment to the California Desert... (ISDRA) and associated plan amendment to the California Desert Conservation Area (CDCA) Plan in...

  2. The NEA programme in the area of nuclear emergency planning, preparedness and management

    International Nuclear Information System (INIS)

    Since the accident at Three Mile Island in the United States in 1979, but more particularly since the Chernobyl accident in the Ukraine in 1986, the Member Countries of the Nuclear Energy Agency (NEA) of the Organisation for Economic Co-operation and Development (OECD) have been interested in nuclear emergency management. This paper briefly describes new strategies and further advancements, as they are currently developed or have been achieved under the auspices of the NEA. The objective of the NEA's work in this area is to improve the efficiency and effectiveness of nuclear emergency planning, preparedness and management, focusing on the international aspects of emergency situations. The strategy employed since the late 1980's has been to develop nuclear emergency exercises to: identify areas which could usefully be improved; test new approaches and concepts in emergency planning, preparedness and management; and develop follow-up strategies, such as workshops and expert group meetings, to address identified issues. This strategy has guided the NEA's emergency matters programme through two series of international exercises, INEX 1 and INEX 2, and towards more such exercises in the future. These exercises has been and will be co-ordinated with other international organisations, such as the IAEA, the EC, the WHO, and the WMO, to ensure most effective use of national and international resources. To date, the programme of work has yielded must experience in the areas of transboundary co-ordinational aspects, short-term countermeasures, agricultural aspects, data management, and information and data input to decision-making. The INEX 2 exercises have been successful at identifying areas where data and information management could be improved, and at testing possible mechanisms for this improvement. In the short term (late 2000, early 2001) a new exercise, INEX 2000, similar in size and scope to those of the INEX 2 series, will be held. The objective of this exercise is

  3. Irondale Gulch : Draft Water Management Plan for Rocky Mountain Arsenal National Wildlife Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Rocky Mountain Arsenal and Irondale Gulch draft Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The...

  4. Integrating Collaboration, Adaptive Management, and Scenario-Planning: Experiences at Las Cienegas National Conservation Area

    Directory of Open Access Journals (Sweden)

    Jeremy K. Caves

    2013-09-01

    Full Text Available There is growing recognition that public lands cannot be managed as islands; rather, land management must address the ecological, social, and temporal complexity that often spans jurisdictions and traditional planning horizons. Collaborative decision making and adaptive management (CAM have been promoted as methods to reconcile competing societal demands and respond to complex ecosystem dynamics. We detail the experiences of land managers and stakeholders in using CAM at Las Cienegas National Conservation Area (LCNCA, a highly valued site under the jurisdiction of the Bureau of Land Management (BLM. The CAM process at Las Cienegas is marked by strong stakeholder engagement, with four core elements: (1 shared watershed goals with measurable resource objectives; (2 relevant and reliable scientific information; (3 mechanisms to incorporate new information into decision making; and (4 shared learning to improve both the process and management actions. The combination of stakeholder engagement and adaptive management has led to agreement on contentious issues, more innovative solutions, and more effective land management. However, the region is now experiencing rapid changes outside managers' control, including climate change, human population growth, and reduced federal budgets, with large but unpredictable impacts on natural resources. Although the CAM experience provides a strong foundation for making the difficult and contentious management decisions that such changes are likely to require, neither collaboration nor adaptive management provides a sufficient structure for addressing the externalities that drive uncontrollable and unpredictable change. As a result, LCNCA is exploring two specific modifications to CAM that may better address emerging challenges, including: (1 creating nested resource objectives to distinguish between those objectives that may be crucial to maintaining ecological resilience from those that may hinder a flexible

  5. Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P Evan

    2004-10-25

    This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

  6. Plan for Development and Management of a National Wildlife Refuge in The Hillside Floodway Area - 1969

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A refuge management plan for the Hillside National Wildlife Refuge drawn up in 1969, the year prior to the service gaining control and management of the refuge.

  7. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  8. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2007-09-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  9. 77 FR 30320 - General Management Plan/Environmental Impact Statement, Ross Lake National Recreation Area, North...

    Science.gov (United States)

    2012-05-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR National Park Service General Management Plan/Environmental Impact Statement, Ross Lake National Recreation... the Final Environmental Impact Statement for the new General Management Plan (GMP) for Ross...

  10. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6.

  11. Waste management plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    This Project Waste Management Plan defines the criteria and methods to be used for managing waste generated during activities associated with Waste Area Grouping 2 at Oak Ridge National Laboratory. The waste management strategy is based on the generation and management of waste on a systematic basis using the most appropriate combination of waste reduction, segregation, treatment, storage, and disposal practices while protecting the environment and human health, maintaining as low as reasonably achievable limits. This plan contains provisions for safely and effectively managing soils and sediments, sampling water, decontamination fluids, and disposable personal protective equipment consistent with the US Environmental Protection Agency guidance. This plan will be used in conjunction with the ORNL ER Program Waste Management Plan

  12. From Civil Protection Plan to Disaster Management. PETer evolution from GIS tool to multi-area Emergency Management System

    Science.gov (United States)

    Frigerio, Simone; Sterlacchini, Simone; Malet, Jean-Philippe; Glade, Thomas

    2010-05-01

    PETer (Protection and Emergency of the Territory) has been developed since 2006 as a tool to manage all the information available to perform a wide range of Civil Protection activities. Based on MapObjects spatial support, it was relied on capacity to manage data from different sources and at different scale, offering practical GIS-tools for a technical and practical use during crisis state. At the first stages of the development, after different assessment, critical on-field analysis and a direct proof on test area, the approach came into sight like a valid database management for the entire dataset, but quite static, not full-blown for every emergency necessity, too complicate and not enough user-friendly, considering people in charge during emergency management, the quick change of state with many parameters involved and also uncertainty, hesitation, confusion or general panic among decision makers. As a second step of research, a more down-to-earth methodology targeted to cope with the aftermath of critical events is presented here. It takes advantage of Geographical Information Systems (GIS), Decision Support Systems (DSS), and Information and Communication Technology (ICT) to prepare, apply and coordinate Civil Protection plans. The main aim was to set up and manage contingency plans in advance; that is, to identify and prepare people in charge to take action to define the activities to be performed, to be aware of available resources and to optimize the communication system among the people involved, in order to efficiently face a prospective crisis phase. A disaster preparedness plan should anticipate the demands for a disaster relief operation and indicate the most effective way of joining those requirements. Through scientific and technical co-operation between public and private research groups, a new platform was planned and set up, in order to test the aims of the project. The application was based on a cooperative organizational structure by which

  13. Project Planning and Management

    NARCIS (Netherlands)

    Weide, van der A.; Beulens, A.J.M.; Dijk, van S.

    2003-01-01

    Project Planning and Management helps prepare the reader to contribute confidently and effectively when working on projects or in managing project teams. This books concentrates on the output of a project as well as the whole process. It is written for projects in the areas of IT and knowledge manag

  14. The integrated resource planning of the energy sector as a basis to water management in urban areas

    Directory of Open Access Journals (Sweden)

    Gilberto de Martino Jannuzzi

    2008-12-01

    Full Text Available The Water Resources Planning in use doesn´t diverges substantially from the Traditional Energy Planning. With the energy crisis occurred at Brazil in 2001 the blackout possibility shows that the impact on the society might happen at any time. The same occurs to the water because of its scarcity. The Integrated Resource Planning (IRP was diffused as a way of fully managing a resource by the supply and demand sizes and can be considerated a viable option for the conventional planning. This composition is meant to do a study of the specific bibliography about the energy IRP and the Water Resource Management. Utilizing conceptions of the energy area, Water Integrated Resource Planning has been created to be used at the public utilities. The Water Integrated Resource Planning conducts the Water Integrated Management through this resource saving, joining this to a different tax and increasing the supply with alternative options such as the wastewater and the rainwater use.

  15. Kenai National Wildlife Refuge Skilak Wildlife Recreation Area Revised Final Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purposes of this final management plan are: 1. To describe wildlife viewing, interpretation, and photography opportunities within the Skilak WRA; 2. To identify...

  16. Rocky Mountain Arsenal National Wildlife Area : Fish and Wildlife Management Plan : Fiscal year 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Rocky Mountain Arsenal National Wildlife Refuge Fish and Wildlife Management Plan was prepared to guide U.S. Fish and Wildlife Service (Service) study and work...

  17. Rocky Mountain Arsenal National Wildlife Area : Fish and Wildlife Management Plan : Fiscal year 1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Rocky Mountain Arsenal National Wildlife Refuge Fish and Wildlife Management Plan was prepared to guide U.S. Fish and Wildlife Service (Service) study and work...

  18. Integrating Collaboration, Adaptive Management, and Scenario-Planning: Experiences at Las Cienegas National Conservation Area

    OpenAIRE

    Jeremy K. Caves; Gitanjali S. Bodner; Karen Simms; Larry A. Fisher; Tahnee Robertson

    2013-01-01

    There is growing recognition that public lands cannot be managed as islands; rather, land management must address the ecological, social, and temporal complexity that often spans jurisdictions and traditional planning horizons. Collaborative decision making and adaptive management (CAM) have been promoted as methods to reconcile competing societal demands and respond to complex ecosystem dynamics. We detail the experiences of land managers and stakeholders in using CAM at Las Cienegas Nationa...

  19. 50 CFR 300.63 - Catch sharing plan and domestic management measures in Area 2A.

    Science.gov (United States)

    2010-10-01

    ... Federal Register the final rule governing sport fishing in area 2A. Annual management measures may be...) Flexible Inseason Management Provisions for Sport Halibut Fisheries in Area 2A. (1) The Regional... unused quota to another Oregon sport subarea. (2) Flexible inseason management provisions include,...

  20. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-03-05

    his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  1. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-03-05

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  2. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  3. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    International Nuclear Information System (INIS)

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted

  4. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  5. BOEM Marine Hydrokinetic (MHK) Planning Areas

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set represents the most recent changes for the Marine Hydrokinetic (MHK Development Planning Areas in the Atlantic. )MHK Planning Areas in this dataset...

  6. Atlantic NAD 83 OCS Planning Areas

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set contains BOEM Planning Area outlines in ESRI shapefile format for the BOEM Atlantic Region. The old Atlantic Planning Area outlines were changed as of...

  7. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    S. E. Rawlinson

    2001-09-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  8. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Science.gov (United States)

    2011-01-20

    ... number of factors. Areas covered by the GGNRA Citizens' Advisory Commission's 1979 pet policy are managed... following objectives: preserve and protect natural and cultural resources and natural processes, provide a... walking in certain, specific areas of GGNRA where impacts to sensitive resources and visitor...

  9. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  10. RCRA Assessment Plan for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Chou, C.J.; Johnson, V.G.

    1999-10-06

    A groundwater quality assessment plan was prepared for waste management area S-SX at the Hanford Site. Groundwater monitoring is conducted at this facility in accordance with Title 40, Code of Federal Regulation (CFR) Part 265, Subpart F [and by reference of Washington Administrative Code (WAC) 173-303-400(3)]. The facility was placed in assessment groundwater monitoring program status after elevated waste constituents and indicator parameter measurements (i.e., chromium, technetium-99 and specific conductance) in downgradient monitoring wells were observed and confirmed. A first determination, as allowed under 40 CFR 265.93(d), provides the owner/operator of a facility an opportunity to demonstrate that the regulated unit is not the source of groundwater contamination. Based on results of the first determination it was concluded that multiple source locations in the waste management area could account for observed spatial and temporal groundwater contamination patterns. Consequently, a continued investigation is required. This plan, developed using the data quality objectives process, is intended to comply with the continued investigation requirement. Accordingly, the primary purpose of the present plan is to determine the rate and extent of dangerous waste (hexavalent chromium and nitrate) and radioactive constituents (e.g., technetium-99) in groundwater and to determine their concentrations in groundwater beneath waste management area S-SX. Comments and concerns expressed by the Washington State Department of Ecology on the initial waste management area S-SX assessment report were addressed in the descriptive narrative of this plan as well as in the planned activities. Comment disposition is documented in a separate addendum to this plan.

  11. Data Management Plan and Functional System Design for the Information Management System of the Clinch River Remedial Investigation and Waste Area Grouping 6

    Energy Technology Data Exchange (ETDEWEB)

    Ball, T.; Brandt, C.; Calfee, J.; Garland, M.; Holladay, S.; Nickle, B.; Schmoyer, D.; Serbin, C.; Ward, M. [Oak Ridge National Lab., TN (United States)

    1994-03-01

    The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementation of a common information management strategy that benefits each program.

  12. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  13. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  14. A Forest Planning Approach with Respect to the Creation of Overmature Reserved Areas in Managed Forests

    OpenAIRE

    Jan Kašpar; Róbert Maru&scaronk; Robert Hlavatý

    2015-01-01

    Forest harvest planning to maximize economic benefits also has to consider additional criteria such as the biodiversity functioning of the managed forest. The biodiversity requirements are determined by the size, shape, and distribution of harvest units and forest stands. A multiple criteria approach is presented where the harvesting volume is maximized while the environmental aspects are also considered. Multiple criteria programming and integer programming techniques are used to find an opt...

  15. THE FIRST PLAN FOR WATER RESOURCES MANAGEMENT OF SOMEȘ-TISA CATCHMENT AREA

    Directory of Open Access Journals (Sweden)

    SOFRONIE C.

    2014-03-01

    Full Text Available With time, after Romania’s accession to the E.U., the national legislation adhered to the Water Framework Directive. In the study we present the Someş and Tisa river catchments management and development plans, from the beginnings till today. We also conclude that the ecological and chemical state for the water bodies in agreement with the Water Framework Directive represents the main challenge for the future of these waters.

  16. THE FIRST PLAN FOR WATER RESOURCES MANAGEMENT OF SOMEȘ-TISA CATCHMENT AREA

    OpenAIRE

    SOFRONIE C.; STOICA F.

    2014-01-01

    With time, after Romania’s accession to the E.U., the national legislation adhered to the Water Framework Directive. In the study we present the Someş and Tisa river catchments management and development plans, from the beginnings till today. We also conclude that the ecological and chemical state for the water bodies in agreement with the Water Framework Directive represents the main challenge for the future of these waters.

  17. Microzonation in Urban Areas, Basic Element for Land-Use Planning, Risk Management and Sustainable Development

    Science.gov (United States)

    Torres Morales, G. F.; Dávalos Sotelo, R.; Castillo Aguilar, S.; Mora González, I.; Lermo Samaniego, J. F.; Rodriguez, M.; García Martínez, J.; Suárez, M. Leonardo; Hernández Juan, F.

    2013-05-01

    This paper presents the results of microzonification of the natural hazards for different metropolitan areas and highlights the importance of integrating these results in urban planning. The cities that have been covered for the definition of danger in the state of Veracruz are: Orizaba, Veracruz and Xalapa, as part of the production of a Geological and Hydrometeorology Hazards Atlas for the state of Veracruz, financed by the Funds for the Prevention of Natural Disasters FOPREDEN and CONACYT. The general data of each metropolitan area was integrated in a geographic information system (GIS), obtaining different theme maps, and maps of dynamic characteristics of soils in each metropolitan area. For the planning of an urban area to aspire to promote sustainable development, it is essential to have a great deal of the details on the pertinent information and the most important is that that has to do with the degree of exposure to natural phenomena. In general, microzonation investigations consider all natural phenomena that could potentially affect an area of interest and hazard maps for each of potential hazards are prepared. With all the data collected and generated and fed into a SIG, models were generated which define the areas most threatened by earthquake, flood and landslide slopes. These results were compared with maps of the main features in the urban zones and a qualitative classification of areas of high to low hazard was established. It will have the basic elements of information for urban planning and land use. This information will be made available to the authorities and the general public through an Internet portal where people can download and view maps using free software available online.;

  18. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ``a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...``. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State`s Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixed waste.

  19. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    International Nuclear Information System (INIS)

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ''a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...''. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State's Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixed waste

  20. Maintenance Plan for the Performance Assessments and Composite Analyses of the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    International Nuclear Information System (INIS)

    U.S. Department of Energy (DOE) Manual M 435.1-1 requires that performance assessments (PAs) and composite analyses (CAs) for low-level waste (LLW) disposal facilities be maintained by the field offices. This plan describes the activities performed to maintain the PA and the CA for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). This plan supersedes the Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (DOE/NV/11718--491-REV 1, dated September 2002). The plan is based on U.S. Department of Energy (DOE) Order 435.1 (DOE, 1999a), DOE Manual M 435.1-1 (DOE, 1999b), the DOE M 435.1-1 Implementation Guide DOE G 435.1-1 (DOE, 1999c), and the Maintenance Guide for PAs and CAs (DOE, 1999d). The plan includes a current update on PA/CA documentation, a revised schedule, and a section on Quality Assurance

  1. RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.

    2007-03-26

    WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modi¬fied in 40 CFR Part 265, Subpart F and Washington State’s Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

  2. Use of modeling to protect, plan, and manage water resources in catchment areas.

    Science.gov (United States)

    Constant, Thibaut; Charrière, Séverine; Lioeddine, Abdejalil; Emsellem, Yves

    2016-08-01

    The degradation of water resources by diffuse pollution, mainly due to nitrate and pesticides, is an important matter for public health. Restoration of the quality of natural water catchments by focusing on their catchment areas is therefore a national priority in France. To consider catchment areas as homogeneous and to expend an equal effort on the entire area inevitably leads to a waste of time and money, and restorative actions may not be as efficient as intended. The variability of the pedological and geological properties of the area is actually an opportunity to invest effort on smaller areas, simply because every action is not equally efficient on every kind of pedological or geological surface. Using this approach, it is possible to invest in a few selected zones that will be efficient in terms of environmental results. The contributive hydraulic areas (CHA) concept is different from that of the catchment area. Because the transport of most of the mobile and persistent pollutants is primarily driven by water circulation, the concept of the CHA is based on the water pathway from the surface of the soil in the catchment area to the well. The method uses a three-dimensional hydrogeological model of surface and groundwater integrated with a geographic information system called Watermodel. The model calculates the contribution (m(3)/h or %) of each point of the soil to the total flow pumped in a well. Application of this model, partially funded by the Seine Normandy Basin Agency, to the catchment of the Dormelles Well in the Cretaceous chalk aquifer in the Orvanne valley, France (catchment area of 23,000 ha at Dormelles, county 77), shows that 95 % of the water pumped at the Dormelles Well comes from only 26 % of the total surface area of the catchment. Consequently, an action plan to protect the water resource will be targeted at the 93 farmers operating in this source area rather than the total number of farmers (250) across the entire 23,000 ha. Another

  3. Use of modeling to protect, plan, and manage water resources in catchment areas.

    Science.gov (United States)

    Constant, Thibaut; Charrière, Séverine; Lioeddine, Abdejalil; Emsellem, Yves

    2016-08-01

    The degradation of water resources by diffuse pollution, mainly due to nitrate and pesticides, is an important matter for public health. Restoration of the quality of natural water catchments by focusing on their catchment areas is therefore a national priority in France. To consider catchment areas as homogeneous and to expend an equal effort on the entire area inevitably leads to a waste of time and money, and restorative actions may not be as efficient as intended. The variability of the pedological and geological properties of the area is actually an opportunity to invest effort on smaller areas, simply because every action is not equally efficient on every kind of pedological or geological surface. Using this approach, it is possible to invest in a few selected zones that will be efficient in terms of environmental results. The contributive hydraulic areas (CHA) concept is different from that of the catchment area. Because the transport of most of the mobile and persistent pollutants is primarily driven by water circulation, the concept of the CHA is based on the water pathway from the surface of the soil in the catchment area to the well. The method uses a three-dimensional hydrogeological model of surface and groundwater integrated with a geographic information system called Watermodel. The model calculates the contribution (m(3)/h or %) of each point of the soil to the total flow pumped in a well. Application of this model, partially funded by the Seine Normandy Basin Agency, to the catchment of the Dormelles Well in the Cretaceous chalk aquifer in the Orvanne valley, France (catchment area of 23,000 ha at Dormelles, county 77), shows that 95 % of the water pumped at the Dormelles Well comes from only 26 % of the total surface area of the catchment. Consequently, an action plan to protect the water resource will be targeted at the 93 farmers operating in this source area rather than the total number of farmers (250) across the entire 23,000 ha. Another

  4. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations, and guilds.

  5. Planning approaches for rurban areas

    DEFF Research Database (Denmark)

    Busck, Anne Gravsholt; Hidding, Marjan; Kristensen, Søren Bech Pilgaard;

    2009-01-01

    Urban growth and sprawl have long put pressure on rural areas, leading to a growing zone of ‘rurban areas' where a multitude of functions, urban or rural, compete for land. The development is acknowledged in European spatial planning documents, which also recommend common solutions. E.g. the spat......Urban growth and sprawl have long put pressure on rural areas, leading to a growing zone of ‘rurban areas' where a multitude of functions, urban or rural, compete for land. The development is acknowledged in European spatial planning documents, which also recommend common solutions. E.......g. the spatial policy discussed and recommended in the European Spatial Development Perspective (ESDP) emphasises the compact city concept, rural-urban linkages and conservation of nature and cultural heritage. This paper compares planning practice for rurban areas in three cases: Roskilde municipality (Denmark......), Staffanstorp municipality (Sweden) and Werv-area (the Netherlands). All three areas belong to the rurban zone and are selected to exemplify pro-active planning. The analysis focuses on how the concept of compact city is perceived and implemented, how rurban areas are managed in order to avoid further urban...

  6. 1991 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bear River Migratory Bird Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  7. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    International Nuclear Information System (INIS)

    This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site. This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site (NTS). The Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) are managed and operated by Bechtel Nevada (BN) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Integrated Closure and Monitoring Plan (ICMP) for these sites is based on guidance for developing closure plans issued by the DOE (DOE, 1999a). The plan does not closely follow the format suggested by the DOE guidance to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. Further, much of the information that would be included in the individual plans is the same, and integration provides efficient presentation. A cross-walk between the contents of the ICMP and the DOE guidance is given in Appendix A. Closure and monitoring were integrated because monitoring measures the degree to which the operational and closed disposal facilities are meeting performance objectives specified in the manual to DOE Order O 435.1. Department of Energy Order 435.1 governs management of radioactive waste, and associated with it are Manual DOE M 435.1-1 and Guidance DOE G 435.1-1. The performance objectives are intended to ensure protection of workers, the public, and the environment from radiological exposure associated with the RWMSs now and in the future

  8. Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP)

  9. Integrating Collaboration, Adaptive Management, and Scenario-Planning to Address Rapid Change: Experiences at Las Cienegas National Conservation Area

    Science.gov (United States)

    Caves, J. K.; Bodner, G.; Simms, K.; Fisher, L.; Robertson, T.

    2012-12-01

    There is growing recognition that public lands cannot be managed as islands; rather, land management must address the ecological, social, and temporal complexity that often spans jurisdictions and traditional planning horizons. Collaborative decision-making and adaptive management (CAM) have been promoted as methods to reconcile competing societal demands and respond to complex ecosystem dynamics. We present the experiences of land managers and stakeholders in using CAM at Las Cienegas National Conservation Area (LCNCA), a highly valued site under the jurisdiction of the Bureau of Land Management (BLM). The CAM process at Las Cienegas is marked by strong stakeholder engagement, with four core elements: 1) shared watershed goals with measurable resource objectives; 2) mechanisms to incorporate new information into decision-making; 3) efforts to make information increasingly relevant and reliable; and 4) shared learning to improve both the process and management actions. The combination of stakeholder engagement and adaptive management has led to agreement on contentious issues, more innovative solutions, and more effective land management. Yet the region is now experiencing rapid changes outside managers' control—including climate change, human population growth, and reduced federal budgets—with large but unpredictable impacts on natural resources. While CAM experience provides a strong foundation for making the difficult and contentious management decisions that such changes are likely to require, neither collaboration nor adaptive management provides a sufficient structure for addressing uncontrollable and unpredictable change. As a result, LCNCA is exploring two specific modifications to CAM that may better address emerging challenges, including: 1) Creating nested resource objectives to distinguish between those objectives which may be crucial from those which may hinder a flexible response to climate change, and 2) Incorporating scenario planning into CAM

  10. A GIS based watershed information system for water resources management and planning in semi-arid areas

    Science.gov (United States)

    Tzabiras, John; Spiliotopoulos, Marios; Kokkinos, Kostantinos; Fafoutis, Chrysostomos; Sidiropoulos, Pantelis; Vasiliades, Lampros; Papaioannou, George; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-04-01

    The overall objective of this work is the development of an Information System which could be used by stakeholders for the purposes of water management as well as for planning and strategic decision-making in semi-arid areas. An integrated modeling system has been developed and applied to evaluate the sustainability of water resources management strategies in Lake Karla watershed, Greece. The modeling system, developed in the framework of "HYDROMENTOR" research project, is based on a GIS modelling approach which uses remote sensing data and includes coupled models for the simulation of surface water and groundwater resources, the operation of hydrotechnical projects (reservoir operation and irrigation works) and the estimation of water demands at several spatial scales. Lake Karla basin was the region where the system was tested but the methodology may be the basis for future analysis elsewhere. Τwo (2) base and three (3) management scenarios were investigated. In total, eight (8) water management scenarios were evaluated: i) Base scenario without operation of the reservoir and the designed Lake Karla district irrigation network (actual situation) • Reduction of channel losses • Alteration of irrigation methods • Introduction of greenhouse cultivation ii) Base scenario including the operation of the reservoir and the Lake Karla district irrigation network • Reduction of channel losses • Alteration of irrigation methods • Introduction of greenhouse cultivation The results show that, under the existing water resources management, the water deficit of Lake Karla watershed is very large. However, the operation of the reservoir and the cooperative Lake Karla district irrigation network coupled with water demand management measures, like reduction of water distribution system losses and alteration of irrigation methods, could alleviate the problem and lead to sustainable and ecological use of water resources in the study area. Acknowledgements: This study

  11. 1999 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  12. Adverse impacts of pasture abandonment in Himalayan protected areas: Testing the efficiency of a Natural Resource Management Plan (NRMP)

    International Nuclear Information System (INIS)

    The high elevational areas in the Himalayas of India are dominated by forests and alpine pastures. There are many protected areas in the region, including Nanda Devi Biosphere Reserve (NDBR) and Valley of Flowers (VOF) where natural resource management plan (NRMP) has been implemented for the conservation of biodiversity. This has affected the traditional animal husbandry system, as well as the vegetation dynamics of alpine pastures. An integrated approach to studying the impact of NRMP in the region has been applied by us. First, a survey was conducted regarding livestock management, data pertaining the livestock husbandry, the role of animal husbandry in economics of rural household, and socioeconomics. Second, field based study on phytosociology of some important alpine herbs was done to enumerate the density and species richness in different land mark of the region. Thereafter, satellite data and Geographic Information System (GIS) were used to develop a land cover map of the area and to note changes in the landscape over time after implementation of NRMP. From an economic point of view the implementation of such plan is a setback to the rural economy. However, the ecological perspective of such models is a threat to the diversity of alpine pastures. The invasion of bushes/thorny bushes/shrubs and weeds with their luxuriant growth is changing the vegetation index and dynamics. Consequently, the diversity of herbs in alpine pastures of the Himalayan Mountains is in jeopardy. Overall, the situation is leading to landscape change in the region. This study is helpful for generating useful outcomes and strategies considering the question or debate 'is grazing good or bad for pasture ecosystems in the Himalayas?'

  13. Upland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Upland Management Plan provides guidelines for the methods and tools to manage uplands on the Arrowwood National Wildlife Refuge to provide quality cover and...

  14. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Cropland Management Plan is to describe cropland management activities at Shiawassee National Wildlife Refuge and provide the basis for future...

  15. Forest Management Plan Sugar Lake Area and Seneca Unit Erie National Wildlife Refuge 1985

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The primary timber management objective is to provide and improve the existing habitat for all indigenous species with primary consideration on migratory birds...

  16. OCS Planning Areas Alaska NAD 83

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set contains BOEM Planning Area outlines in ESRI shapefile format for the BOEM Alaska Region. The Submerged Lands Act (SLA) boundary, along with the...

  17. Disaster Management Plans

    OpenAIRE

    Ikeda, Makoto

    2012-01-01

    Following its devastating experience with recent disasters, Japan has been strengthening or drawing up new disaster management plans at the national and local levels. The Great East Japan Earthquake (GEJE) revealed a number of weaknesses in planning for complex and extraordinary disasters. Central and local governments have been revising their plans to reflect what they learned from the GE...

  18. RCRA Assessment Plan for Single-Shell Tank Waste Management Area B-BX-BY at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Narbutovskih, Susan M.

    2006-09-29

    This document was prepared as a groundwater quality assessment plan revision for the single-shell tank systems in Waste Management Area B-BX-BY at the Hanford Site. Groundwater monitoring is conducted at this facility in accordance with 40 CFR Part 265, Subpart F. In FY 1996, the groundwater monitoring program was changed from detection-level indicator evaluation to a groundwater quality assessment program when elevated specific conductance in downgradient monitoring well 299 E33-32 was confirmed by verification sampling. During the course of the ensuing investigation, elevated technetium-99 and nitrate were observed above the drinking water standard at well 299-E33-41, a well located between 241-B and 241-BX Tank Farms. Earlier observations of the groundwater contamination and tank farm leak occurrences combined with a qualitative analysis of possible solutions, led to the conclusion that waste from the waste management area had entered the groundwater and were observed in this well. Based on 40 CFR 265.93 [d] paragraph (7), the owner-operator must continue to make the minimum required determinations of contaminant level and rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.

  19. The integrated resource planning of the energy sector as a basis to water management in urban areas

    OpenAIRE

    Gilberto de Martino Jannuzzi; Ricardo da Silva Manca

    2008-01-01

    The Water Resources Planning in use doesn´t diverges substantially from the Traditional Energy Planning. With the energy crisis occurred at Brazil in 2001 the blackout possibility shows that the impact on the society might happen at any time. The same occurs to the water because of its scarcity. The Integrated Resource Planning (IRP) was diffused as a way of fully managing a resource by the supply and demand sizes and can be considerated a viable option for the conventional planning. This com...

  20. Grassland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan is for Bear River Migratory Bird Refuge in Utah. It includes a summary of the refuge, special considerations for endangered species,...

  1. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations...

  2. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  3. Fish Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Fish Management Plan for Muscatatuck NWR. The Plan provides an introduction to the Refuge, a description of the area, a description of the fish resource...

  4. Groundwater quality assessment plan for single-shell tank waste management Area U at the Hanford Site

    International Nuclear Information System (INIS)

    Waste Management Area U (WMA U) includes the U Tank Farm, is currently regulated under RCRA interim-status regulations, and is scheduled for closure probably post-2030. Groundwater monitoring has been under an evaluation program that compared general contaminant indicator parameters from downgradient wells to background values established from upgradient wells. One of the indicator parameters, specific conductance, exceeded its background value in one downgradient well triggering a change from detection monitoring to a groundwater quality assessment program. The objective of the first phase of this assessment program is to determine whether the increased concentrations of nitrate and chromium in groundwater are from WMA U or from an upgradient source. Based on the results of the first determination, if WMA U is not the source of contamination, then the site will revert to detection monitoring. If WMA U is the source, then a second part of the groundwater quality assessment plan will be prepared to define the rate and extent of migration of contaminants in the groundwater and their concentrations

  5. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  6. Lucas Heights buffer zone: plan of management

    International Nuclear Information System (INIS)

    This plan is being used by the Commission as a guide for its management of the Lucas Heights buffer zone, which is essentially a circular area having a 1-6 km radius around the HIFAR reactor. Aspects covered by this plan include past uses, current use, objectives for buffer zone land management, emergency evacuation, resource conservation, archaeology, fire, access, rehabilitation of disturbed areas, resource management and plan implementation

  7. ICDF Complex Operations Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  8. Wilderness Management Plan: Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Wilderness Management Plan for Tamarac NWR provides an introduction to the Refuge; a description of the Wilderness Area; a summary of management practices;...

  9. Data Base Management Plan for the remedial investigation of Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    The remedial investigation (RI) for Waste Area Grouping (WAG) 5 will involve gathering, verifying, analyzing, reporting, and archiving numerous types of field and analytical data. Field investigations will produce data documenting surficial and geophysical surveys, geologic and hydrogeologic logs, aquifer tests, water level measurements, geophysical logs, and stream and seepage flow measurements. Laboratory analyses will be performed on soil, surface water, groundwater, and sediment samples collected during field investigations. All data resulting from these activities will be contained in the Bechtel RI/feasibility study (FS) project data base and will be managed in accordance with the RI/FS Data Base Management Plan and this WAG-specific plan. This Data Base Management Plan describes the gathering, verifying, analyzing, reporting, and archiving of data generated during Bechtel's remedial investigation of Waste Area Grouping 5. This investigation will produce data documenting surficial surveys, geophysical surveys, geologic and hydrologic logs, aquifer tests, water level measurements, geophysical logs, and stream and seep flow measurements. Also, laboratory analyses will be performed on soil, surface water, groundwater, and sediment samples. The 1500 series of Bechtel project procedures, ''Data Base Management,'' and the project Data Base Management Plan will be used to ensure that data are handled properly

  10. Plutonium Vulnerability Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  11. Plutonium Vulnerability Management Plan

    International Nuclear Information System (INIS)

    This Plutonium Vulnerability Management Plan describes the Department of Energy's response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department's Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B

  12. Data Base Management Plan for the remedial investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    This Data Base Management Plan describes the gathering, verifying, analyzing, reporting, and archiving of data generated during the remedial investigation of Waste Area Grouping 10, Operable Unit 3. This investigation will produce data documenting wellhead surveys, well headspace gas pressure measurements, geophysical surveys, water level measurements, and borehole geophysical logs. Close Support Laboratory analyses will be performed on well headspace gas and well water samples

  13. Driftless Area National Wildlife Refuge: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Driftless Area NWR for the next 15 years. This plan outlines the Refuge vision and...

  14. Medical waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  15. Biohazardous waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  16. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  17. Planning and management of change

    International Nuclear Information System (INIS)

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  18. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  19. Detailed oil spill contingency analysis in establishment of preparedness plans for exploration drilling in environmentally sensitive areas: an integrated management process

    Energy Technology Data Exchange (ETDEWEB)

    Spikkerud, Cathrine S.; Skeie, Geir Morten; Brude, Odd Willy; Gravir, Gjermund [DNV Managing Risk, Oslo (Norway)

    2008-07-01

    This paper describes the integrated management process leading up to a dynamic oil spill preparedness plan based on detailed analysis of oil spill contingency requirements and environmental risk in environmentally sensitive areas. Starting with a detailed environmental risk and oil spill contingency analysis, oil spill preparedness plans are developed. These plans are generic for the area possibly affected by an oil spill, and are developed in detail for environmental 'hot spots' that are highly challenging in terms of oil spill response. The detailed plans make use of detailed data sets on shoreline substrate sensitivities and cleanup methodology, photographic inventory, logistical issues and access to real-time incident data for important areas. This detailed approach ensures sufficient knowledge about the sensitive area in advance to provide fast and correct strategic and tactical operational recovery decisions. A final element of the integrated process is a web based GIS, providing all parties involved with one common situation overview, ensuring that the facts remain in focus throughout the operation and that those responsible for informing stake-holders have access to correct and timely updated information. (author)

  20. Environmental Management System Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most

  1. Wilderness management plan : Farallon National Wildlife Refuge : Farallon Wilderness : Wilderness management plan [draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Farallon Wilderness. After introducing the area, it analyzes current management practices against current public...

  2. Fishery management plan: Yazoo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan was prepared by the U.S. Fish and Wildlife Service for Yazoo National Wildlife Refuge. Data was provided by the Refuge and Area Office Wildlife...

  3. Bison and Elk Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Bison and Elk Management Plan is to provide managers with goals, objectives, and strategies for managing bison and elk on the National Elk Refuge...

  4. Kulm Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this habitat management plan (HMP) is to provide a strategic plan for consistently and effectively protecting, acquiring, enhancing, restoring, and...

  5. Data and records management plan for the White Wing Scrap Yard (Waste Area Grouping 11) geophysical survey at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    A geophysical survey is being conducted across the Waste Area Grouping (WAG) 11 site to locate buried nonindigenous materials. The survey team will collect data manually in field logbooks and on field forms using two types of instrumentation. This Data and Records Management Plan will describe the process necessary to record and track the geophysical data in a manner that will comply with the data quality objectives (DQOs) described in the WAG 11 Geophysical Survey Work Plan and with Environmental Restoration (ER) regulations concerning project records. This plan provides guidance on handling documentation within CDM Federal Programs Corporation (CDM Federal) and by the survey team in the field. An initial (Phase 1) survey will be performed in established areas (referred to as known target areas) using both 10-ft and 20-ft grid spacing. The results of the Phase 1 survey will be evaluated to determine the appropriate grid spacing to be used for the subsequent survey phase. The second phase (Phase 2) will then cover the remainder of the WAG 11 area using the grid spacing determined in Phase 1. The objective of the Phase 2 survey will be to estimate the horizontal and vertical extent of nonindigenous materials in the subsurface that are man-made, ferrous, highly resistive, and/or possess conductivity above background, based on the survey grid established in Phase 1

  6. Waste Management Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Waste Management Group

    2006-08-14

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

  7. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  8. 1994 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this...

  9. Solid Waste Management in Greater Shillong Planning Area (GSPA) Using Spatial Multi-Criteria Decision Analysis for Site Suitability Assessment

    Science.gov (United States)

    Mipun, B. S.; Hazarika, R.; Mondal, M.; Mukhopadhyay, S.

    2015-04-01

    In Shillong city the existing solid waste management system is mobile waste bins (72%). About 12 percent burn the waste generated by them. Door to door collection is about 5 percent. Over 2 percent households throw the wastes in the open space. Another 9 percent households throw their wastes into the waste bins located in the neighbourhood. The local headman takes care about half of the household's wastes, while Municipality takes care about 34 percent households. About 10 percent households are ignorant about the collection and disposal of wastes. Some NGO's takes care about 5 percent household's wastes. Awareness about segregation of waste into organic and non-bio degradable waste is 64 percent and a significant numbers do the segregation. In Shillong Municipality Board (SMB) area collects 45.91% (78.42 MT) waste, outside SMB area collection is 32.61% (45.99 MT) and entire GSPA the percentage of garbage collected is 41percent. The only dumping ground in GSPA is Marten, Mawiong, and the capacity to hold garbage is decreasing due to limited landfill. The sanitary landfill site is 5.0 acres that it is not enough to meet the demand. Out of he total area 170.69 sq. km. (GSPA) only 25.67% is most suitable and 18.58% is unsuitable to set up a new landfill area. Eastern part of the GSPA, is most suitable, which fulfils the entire criterion adopted in this study. In this the best-stated criterion are land cover (vacant space), slope (2000m) and elevation (1300-1500m). The eastern part of the GSPA is most suitable landfill location.

  10. Groundwater quality assessment plan for single-shell waste management area B-BX-BY at the Hanford Site

    International Nuclear Information System (INIS)

    Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), the owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility

  11. Groundwater quality assessment plan for single-shell waste management area B-BX-BY at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    SM Narbutovskih

    2000-03-31

    Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), the owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.

  12. Waste Management Plan for the Remedial Investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    This Waste Management Plan (WMP) supplements the Remedial Investigation/Feasibility Study (RI/FS) Project WMP and defines the criteria and methods to be used for managing and characterizing waste generated during activities associated with the RI of 23 wells near the Old Hydrofracture Facility (OHF). These wells are within the Waste Area Grouping (WAG) 5 area of contamination (AOC) at Oak Ridge National Laboratory (ORNL). Field activities for the limited RI of Operable Unit (OU) 3 of WAG 10 will involve sampling and measurement of various environmental media (e.g., liquids and gases). Many of these activities will occur in areas known to be contaminated with radioactive materials or hazardous chemical substances, and it is anticipated that contaminated solid and liquid wastes and noncontaminated wastes will be generated as a result of these activities. On a project-wide basis, handling of these waste materials will be accomplished in accordance with the RI/FS Project WMP and the procedures referenced throughout the plan

  13. Waste Management Plan for the Remedial Investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This Waste Management Plan (WMP) supplements the Remedial Investigation/Feasibility Study (RI/FS) Project WMP and defines the criteria and methods to be used for managing and characterizing waste generated during activities associated with the RI of 23 wells near the Old Hydrofracture Facility (OHF). These wells are within the Waste Area Grouping (WAG) 5 area of contamination (AOC) at Oak Ridge National Laboratory (ORNL). Field activities for the limited RI of Operable Unit (OU) 3 of WAG 10 will involve sampling and measurement of various environmental media (e.g., liquids and gases). Many of these activities will occur in areas known to be contaminated with radioactive materials or hazardous chemical substances, and it is anticipated that contaminated solid and liquid wastes and noncontaminated wastes will be generated as a result of these activities. On a project-wide basis, handling of these waste materials will be accomplished in accordance with the RI/FS Project WMP and the procedures referenced throughout the plan.

  14. 300 Area Process Trenches Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    Luke, S.N.

    1994-08-15

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ``co-operator.`` The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit.

  15. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  16. Waste Isolation Pilot Plant, Land Management Plan

    International Nuclear Information System (INIS)

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives

  17. Planning, Coordinating, and Managing Off-Site Storage is an Area of Increasing, Professional Responsibility for Special Collections Departments

    Directory of Open Access Journals (Sweden)

    Melissa Goertzen

    2016-03-01

    two locations instead of one. Also, the integration of new workflows required additional oversight to ensure adequate control at all points of process. Static staffing levels and increased levels of responsibility impacted preservation and conservation activities as well. A central concern was the handling of materials by facility staff not trained as special collections professionals. In regard to the facilities themselves, a general concern was that commercial warehouses do not always provide the kind of environmental control systems recommended for storage of special collections materials. Of the total sample group, 12 participants (19% said their institution does not use off-site storage for special collections. When asked if this may occur in the future, four directors (33% said they anticipate off-site storage use within the next five years. Lack of space was listed as the primary motivation. Conclusion – Study findings provide evidence for what was previously known anecdotally: planning, coordinating, and managing off-site storage is a significant professional responsibility that will only grow in the future. As primary resources are integrated into research, teaching, and learning activities, the acquisition of special collections materials will continue to grow. Discussions regarding off-site storage workflows and strategic planning will continue as professionals seek compromises that meet the unique needs of acquisition, preservation, and public service.

  18. 1988 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1987 Annual Water Management Report 1988 Annual Water Management Plan. Includes 1987 weather summary, water availability forecast, summary of 1987...

  19. TWRS Configuration management program plan

    Energy Technology Data Exchange (ETDEWEB)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  20. Sustainable forest management planning in Serbia

    Directory of Open Access Journals (Sweden)

    Medarević Milan

    2014-01-01

    Full Text Available The forest cover of Serbia occupies around 29% of its territory, which puts it among fairly well wooded countries in Europe. The forests of Serbia are characterized by both state and private forests, medium preservation status, i.e. 27% of area that is covered by insufficiently stocked stands. Coppice forests cover about 50% of the area, and private forests are additionally burdened by fragmented plots. Forest management planning in Serbia is older than 200 years (The Plan of Deliblato Sands Afforestation 1806. There are two basic assumptions that define forest management planning: sustainability and multifunctionality. Today, forest management planning in Serbia is regulated by the Law on forests and it has the characteristics of a system. The planning also has the characteristics of an integral, integrated and adaptive system. The latter is particularly important in terms of pronounced climatic changes. For the forests in protected objects of nature, there are also other types of plans that complement sector plans in forestry (e.g. management plans in protected areas.

  1. Patoka River National Wildlife Refuge & Management Area Hunting and Fishing Plan : Intra-Service Section 7 Evaluation Form

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Section 7 Evaluation states that the Patoka River NWR Hunting and Fishing Plan is not likely to adversely affect listed species or critical habitats on the...

  2. Dahomey Plantation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Plan describing timber, wildlife and recreational assessments and assoicated development costs of the Dahomey Plantion timberlands. Plan details existinig forest...

  3. MANAGEMENT IN RURAL AREAS

    Directory of Open Access Journals (Sweden)

    Danimir Štros

    2015-07-01

    Full Text Available Croatia has been seeking to achive pre-war results in tourism since its independence. Rural tourism in Croatia based on family farma faces a number of problems legal foundations, the involement of local communities, inadequate entepreneur support etc. The political will for development exists, but there is lack of willingness and the ability to get things started, which results in the closure of family farma who cannot cope with the parallel job of agriculture and tourism. Arriving guests certainly want a new type of tourism: peace, clean environment, cultural intangible and tangible treasures, all without the noise and stress; and Croatia can definitely offer it, either in coastal or inland areas with traditional food and drinks. The destinations connection is not satisfactora. there is also an evident lack of legislation and regional spatial development plans for sustainable tourism which is a prerequisite for successful tourism. With these plans presumptins accepted, Croatian tourism would become distinctive and inland and coastal branches of tourism could complement each other so that the customer can spend his vacation both in the continental ant the maritime part of the country, getting to know our culture and enjoy the traditional cousine.

  4. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  5. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  6. Annual Water Management Plan 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi River National Wildlife and Fish Refuge - Savanna District Water Management Plan has been developed to meet the station objectives set forth...

  7. 31 CFR 206.6 - Cash management planning and review.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Cash management planning and review... planning and review. (a) An agency shall periodically perform cash management reviews to identify areas...) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE MANAGEMENT OF FEDERAL...

  8. Spatial Management Areas

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Spatial management files combine all related and relevant spatial management files into an integrated fisheries management file. Overlaps of the redundant spatial...

  9. Fisheries Management Plan Cameron Prairie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the fisheries management plan for the refuge. This plan develops strategies and tasks for maintaining a viable fishery for Unit 8. There are other areas...

  10. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  11. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  12. AVLIS production plant waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

  13. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  14. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  15. 7 CFR 1940.959 - Area plan.

    Science.gov (United States)

    2010-01-01

    ... area. (b) An inventory and assessment of the human resources of the area, including, but not limited to... the plan; and (5) An analysis of the human needs of the area, the resources in the area available to... possibilities for industrial recruitment in the area; (5) The potential for development of tourism in the...

  16. Regional Management Plan: Summary report

    International Nuclear Information System (INIS)

    This summary report describes the results of a 16-month project to develop a Regional Management Plan for low-level radioactive waste management in a seven-state area. The seven states are Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio, and Wisconsin. These states have formed the Midwest Interstate Low-Level Radioactive Waste Commission in accord with Congressional requirements established in 1980. What is low-level radioactive waste? Low-level radioactive waste results from the use of radioactive materials in the treatment of disease, the production of consumer goods and industrial products, and from the generation of electricity at nuclear power plants. Low-level wastes, which are a responsibility of the states, are grouped into three classes, A, B, and C; this classification scheme is prescribed by Federal Regulations and represents different degrees of hazard associated with different concentrations of radioactive materials. Class A wastes are the least hazardous. Classes B and C represent higher hazard classes. 14 refs., 13 figs., 9 tabs

  17. Defense waste management plan

    International Nuclear Information System (INIS)

    Defense high-level waste (HLW) and defense transuranic (TRU) waste are in interim storage at three sites, namely: at the Savannah River Plant, in South Carolina; at the Hanford Reservation, in Washington; and at the Idaho National Engineering Laboratory, in Idaho. Defense TRU waste is also in interim storage at the Oak Ridge National Laboratory, in Tennessee; at the Los Alamos National Laboratory, in New Mexico; and at the Nevada Test Site, in Nevada. (Figure E-2). This document describes a workable approach for the permanent disposal of high-level and transuranic waste from atomic energy defense activities. The plan does not address the disposal of suspect waste which has been conservatively considered to be high-level or transuranic waste but which can be shown to be low-level waste. This material will be processed and disposed of in accordance with low-level waste practices. The primary goal of this program is to utilize or dispose of high-level and transuranic waste routinely, safely, and effectively. This goal will include the disposal of the backlog of stored defense waste. A Reference Plan for each of the sites describes the sequence of steps leading to permanent disposal. No technological breakthroughs are required to implement the reference plan. Not all final decisions concerning the activities described in this document have been made. These decisions will depend on: completion of the National Environmental Policy Act process, authorization and appropriation of funds, agreements with states as appropriate, and in some cases, the results of pilot plant experiments and operational experience. The major elements of the reference plan for permanent disposal of defense high-level and transuranic waste are summarized

  18. Underground storage tank management plan

    International Nuclear Information System (INIS)

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  19. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  20. Land Protection Plan: Dakota Grassland Conservation Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Land Protection Plan for Dakota Grassland Conservation Area provides a description of the project, a description of the area and its resources, threats to the...

  1. Blitzen Valley Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 64,000 acre Blitzen Valley unit of Malheur National Wildlife Refuge is not producing enough wildlife to meet the refuge's migratory bird objectives. The area...

  2. Wilderness management plan : Monomoy National Wildlife Refuge : Monomoy Wilderness

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Monomoy Wilderness. After introducing the area, it analyzes current management practices against current public...

  3. Sustainable forest management planning in Serbia

    OpenAIRE

    Medarević Milan; Šljukić Biljana; Obradović Snežana

    2014-01-01

    The forest cover of Serbia occupies around 29% of its territory, which puts it among fairly well wooded countries in Europe. The forests of Serbia are characterized by both state and private forests, medium preservation status, i.e. 27% of area that is covered by insufficiently stocked stands. Coppice forests cover about 50% of the area, and private forests are additionally burdened by fragmented plots. Forest management planning in Serbia is older than 200...

  4. Career Management and Planning

    OpenAIRE

    TOKAY, Ozhan

    2015-01-01

    The world economy has witnessed many big and fast changes in this era. The companies which have old technology, deal with old world business types are experiencing financial problems and show a tendency to dismiss staff from employment because of not being able to keep up with the times. On the other hand, science and technology’s very fast changes caused new business areas to be created, and the companies and institutions which front these new areas, are faced with distress of ab...

  5. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Science.gov (United States)

    2012-12-14

    ... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental Impact Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska... Management Area (ERMA) designation. The Ring of Fire RMP ROD also deferred to a subsequent planning...

  6. A reservoir management plan

    Energy Technology Data Exchange (ETDEWEB)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  7. Forest Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tamarac National Wildlife Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest description, forest management...

  8. Mississippi Sandhill Crane NWR Forest Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mississippi Sandhill Crane NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  9. Forest Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  10. Forest Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  11. Forest Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mingo NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  12. 7 CFR Exhibit A to Subpart B of... - Grant Agreement-Growth Management and Housing Planning for Approved Designated Energy Impacted Areas

    Science.gov (United States)

    2010-01-01

    ... estate or vehicles, improvement and renovation of space, and repair and maintenance of privately-owned... 7 Agriculture 13 2010-01-01 2009-01-01 true Grant Agreement-Growth Management and Housing Planning... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL...

  13. Management Planning: Innovation on Campus.

    Science.gov (United States)

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  14. The ANSTO waste management action plan

    Energy Technology Data Exchange (ETDEWEB)

    Levins, D. [Australian Nuclear Science and Technology Organisation (ANSTO), Lucas Heights, NSW (Australia)

    1997-12-31

    ANSTO`s Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA. 3 refs., 2 tabs., 2 figs.

  15. Environmental Assessment for opening portions of Patoka River National Wildlife Refuge and Management Area for hunting and fishing as proposed in the 1996 Hunting and Fishing Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The U.S. Fish and Wildlife Service proposes to open portions of the Patoka River National Wildlife Refuge and Management Area (Refuge) for hunting (migratory birds,...

  16. Louisiana Marsh Management Plan 1995

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We sampled experimental research areas in the Barataria Basin of Louisiana during March and May, 1995, to examine the effects of structural marsh management on...

  17. Recommendations for a Barrier Island Breach Management Plan for Fire Island National Seashore, including the Otis Pike High Dune Wilderness Area, Long Island, New York

    Science.gov (United States)

    Williams, S. Jeffress; Foley, Mary K.

    2007-01-01

    The U.S Army Corps of Engineers, New York District is developing engineering plans, including economic costs and benefits, for storm damage reduction along an 83 mile stretch of the coastal barrier islands and beaches on the south shore of Long Island, NY from Fire Island Inlet east to the Montauk Point headland. The plan, expected to include various alternatives for storm protection and erosion mitigation, is referred to as the Fire Island to Montauk Point Reformulation Plan (FIMP). These plans are expected to follow the Corps of Engineers’ Environmental Operating Principles striving for long term environmental sustainability and balance between environmental protection and protection of human health and property. Fire Island National Seashore (FIIS), a 19,579 acre unit of the National Park System includes a 32 mile long coastal barrier island located within the FIMP project area. A seven-mile section of the park, Otis Pike Fire Island High Dune Wilderness Area, is also a designated Federal Wilderness Area. The FIIS includes not only the barrier island and sand dunes, but also several islands, sand flats and wetlands landward of the barrier, submerged parts of Great South Bay shoreface, extending approximately 4,000 feet into the bay with the inner shelf region extending approximately 1,000 feet seaward of the Fire Island shoreline. The Fire Island barrier islands, a sand-starved system dominated by highly dynamic processes, are struggling to maintain their integrity in the face of sea-level rise and storms. Adding to the dilemma is that development on the barriers and the mainland has increased greatly during the past 50 years. As such, managers and decision makers in federal agencies, state agencies and local governments are challenged to balance tradeoffs between protection of lives and property, public access and long term conservation of natural habitats and processes and the plants and animals that depend on these habitats. National Park Service (NPS

  18. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  19. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  20. Managing ecotourism visitation in protected areas

    Science.gov (United States)

    Marion, J.L.; Farrell, T.A.; Lindberg, Kreg; Wood, Megan Epler; Engeldrum, David

    1998-01-01

    Ecotourism management seeks to integrate and balance several potentially conflicting objectives: protection of natural and cultural resources, provision of recreation opportunities and generation of economic benefits. In the absence of effective planning and management, ecotourism can lead to significant negative impacts on vegetation, soil, water, wildlife, historic resources, cultures, and visitor experiences. This chapter reviews visitor-related natural resource and experience impacts associated with ecotourism within protected areas. The influence of factors that control the nature and extent of impacts are also reviewed, including type and amount of use, the variable resistance and resilience of environmental attributes such as vegetation and soil types, and the role of management in shaping visitation, resources and facilities to support visitation while minimizing associated impacts. Implications for managing the effects of protected area visitation are highlighted, including carrying capacity decision frameworks and selecting management strategies and tactics.

  1. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  2. Assessment of Diversity, Distribution, Conservation Status and Preparation of Management Plan for Medicinal Plants in the Catchment Area of Parbati Hydroelectric Project Stage -Ⅲ in Northwestern Himalaya

    Institute of Scientific and Technical Information of China (English)

    S.S. Samant; Jitendra S. Butola; Aman Sharma

    2007-01-01

    ligulata may be considered as threatened species due to their over exploitation for trade. 90 species are propagated by seeds, 8 species by seeds and rhizomes/roots/tubers,4 species by seeds and cuttings, and 2 species by sori.A management plan for the cultivation and conservation of the medicinal plants in the dam submergence area, and the commercially viable medicinal plants with high value in the catchment area is suggested.

  3. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  4. Annual Water Management Plan, Part I

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  5. Annual Water Management Plan, Part II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  6. Annual water management plan 1998-1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  7. Annual water management plan 1996-1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  8. Annual water management plan - 1993-1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  9. Annual water management plan 1994-1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  10. Annual water management plan 1995-1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  11. Necedah National Wildlife Refuge furbearer management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Furbearer Management Plan for the Necedah National Wildlife Refuge is one of several step-down plans identified in the Refuge’s Comprehensive Conservation Plan...

  12. Groundwater and surface-water resources in the Bureau of Land Management Moab Master Leasing Plan area and adjacent areas, Grand and San Juan Counties, Utah, and Mesa and Montrose Counties, Colorado

    Science.gov (United States)

    Masbruch, Melissa D.; Shope, Christopher L.

    2014-01-01

    The Bureau of Land Management (BLM) Canyon Country District Office is preparing a leasing plan known as the Moab Master Leasing Plan (Moab MLP) for oil, gas, and potash mineral rights in an area encompassing 946,469 acres in southeastern Utah. The BLM has identified water resources as being potentially affected by oil, gas, and potash development and has requested that the U.S. Geological Survey prepare a summary of existing water-resources information for the Moab MLP area. This report includes a summary and synthesis of previous and ongoing investigations conducted in the Moab MLP and adjacent areas in Utah and Colorado from the early 1930s through the late 2000s. Eight principal aquifers and six confining units were identified within the study area. Permeability is a function of both the primary permeability from interstitial pore connectivity and secondary permeability created by karst features or faults and fractures. Vertical hydraulic connection generally is restricted to strongly folded and fractured zones, which are concentrated along steeply dipping monoclines and in narrow regions encompassing igneous and salt intrusive masses. Several studies have identified both an upper and lower aquifer system separated by the Pennsylvanian age Paradox Member of the Hermosa Formation evaporite, which is considered a confining unit and is present throughout large parts of the study area. Surface-water resources of the study area are dominated by the Colorado River. Several perennial and ephemeral or intermittent tributaries join the Colorado River as it flows from northeast to southwest across the study area. An annual spring snowmelt and runoff event dominates the hydrology of streams draining mountainous parts of the study area, and most perennial streams in the study area are snowmelt-dominated. A bimodal distribution is observed in hydrographs from some sites with a late-spring snowmelt-runoff peak followed by smaller peaks of shorter duration during the late

  13. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  14. Station Management Plan Maine Coastal Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan outlines how four Maine refuges and twelve islands and one peninsula should be managed over the next three to five years. Plan results are...

  15. Litchfield Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Litchfield Wetland Management District for the next 15 years. This plan outlines the...

  16. Forest Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney National Wildlife Refuge Forest Management Plan is a general plan which outlines the management objectives, forest descriptions and silviculture of...

  17. Grassland Management Plan : Trempealeau National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Trempealeau National Wildlife Refuge Grassland Management Plan provides guidelines for grassland habitat preservation and management. The goals of this plan aim...

  18. Forest Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee National Wildlife Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest description, forest...

  19. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  20. Study on Planning Standards for Urban Renewal Areas in Shenzhen

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    The paper starts from the origin and evolution of city planning standards of Shenzhen before analyzing the new demands for the standards by the development of city renewal amid city transition,and establishes a primary framework for the planning standards and requirements.In addition,on the basis of comparing with the formulation of planning standards of Hong Kong,Shanghai,and Changsha,the paper carries out a discussion on the formulation ideas and main contents of the planning standards for the urban renewal areas in Shenzhen.Moreover,the paper also analyzes the standards for renewal objects,scope,mode,functions guidance,development control,and public facilities,all of which are quite heated issues and key elements in the process of formulation and approval of renewal planning,in order to improve the institutional structure of the City Planning Standards and Requirements of Shenzhen and meet the government’s demand in realizing a refined management.

  1. WRAP process area development control work plan

    Energy Technology Data Exchange (ETDEWEB)

    Leist, K.L., Fluor Daniel Hanford

    1997-02-27

    This work plan defines the manner in which the Waste Receiving and Processing Facility, Module I Process Area will be maintained under development control status. This status permits resolution of identified design discrepancies, control system changes, as-building of equipment, and perform modifications to increase process operability and maintainability as parallel efforts. This work plan maintains configuration control as these efforts are undertaken. This task will end with system testing and reissue of field verified design drawings.

  2. 300 Area Spill Prevention, Control, and Countermeasures Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duffield, G.W.

    1990-11-01

    This Spill Prevention, Control, and Countermeasures (SPCC) Plan is designed to describe measures that must be taken to prevent, control, and handle spills of bulk storage chemicals or oils at Westinghouse Hanford Company (Westinghouse Hanford) facilities located in the Hanford Site 300 Area. The SPCC Plan is designed to satisfy the requirement from US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program,`` which is intended to minimize risk to the environment or public health, and to anticipate and address potential environmental problems before they pose a threat to the quality of the environment or the public welfare. The SPCC Plan identifies practices employed by Westinghouse Hanford to prevent a reportable quantity (RQ) of a hazardous substance [as defined in Title 40, Code of Federal regulations, Part 302 (40 CFR 302)] from being released to the environment. This SPCC Plan fulfills the requirement cited in WHC-CM-7-5, Part T, which establishes Westinghouse Hanford policy for required SPCC Plans, and references 40 CFR 112, ``Environmental Protection Agency Regulations on Oil Pollution Prevention,`` as a basis for contents of the SPCC Plan. Upon completion of the SPCC Plan, a copy will be kept on file at all 300 Area facilities described in the SPCC Plan. Additional copies will also be placed with the 300 Area Industrial Safety and Fire Protection management, and with other environmental oversight, and emergency preparedness, and response personnel as necessary. 1 fig.

  3. Fishery Management Plan for Morgan Brake National Wildlife Refuge - 1992

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan was prepared by the U. S. Fish and Wildlife Service for Morgan Brake National Wildlife Refuge. Data was provided by the Refuge and Area Office...

  4. Fishery Management Plan for Mathews Brake National Wildlife Refuge - 1985

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan was prepared by the U.S. Fish and Wildlife Service for Mathew's Brake National Wildlife Refuge. Data was provided by the refuge and area office...

  5. Comparison of the NCRA and NAACCR Strategic Management Plans.

    Science.gov (United States)

    Menck, Herman R

    2012-01-01

    The Strategic Management Plans of the National Cancer Registrars Association (NCRA) and the North American Association of Central Cancer Registries (NAACCR) were compared, and differences noted. No uncovered subject areas were found.

  6. Strategic management or strategic planning for defense?

    OpenAIRE

    Tritten, James John; Roberts, Nancy Charlotte

    1989-01-01

    Approved for public release; distribution is unlimited. This report describes problems associated with strategic planning and strategic management within DoD. Authors offer a series of suggested reforms to enhance mono-level planning and management within DoD, primarily by closer ties with industry planning groups, education, organizational structure, management information systems, and better integration. Additional sponsors are: OSD competitive Strategies Office, OSD Strategic Planning B...

  7. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  8. Water management plan : revised March 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Content of the Ruby Lake NWR Water Management Plan includes information on refuge background, objectives and management strategies, and water management program...

  9. Management plan abstract and keyword generator

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fill-in-the-blank Word form will generate abstracts for common management plans including: cropland management, disease contingency, fire management, fishing,...

  10. Fur Management Plan : Tewaukon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tewaukon NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  11. Furbearer Management Plan : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  12. Fur Management Plan : Ottawa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Ottawa NWR Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental health,...

  13. Chautauqua National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chautauqua National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  14. Fur Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  15. Refuge Management Plan, Part III : Chapter 2 : Forest Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tamarac NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  16. 77 FR 40380 - Outer Continental Shelf, Gulf of Mexico, Oil and Gas Lease Sales, Western Planning Area Lease...

    Science.gov (United States)

    2012-07-09

    ... Bureau of Ocean Energy Management Outer Continental Shelf, Gulf of Mexico, Oil and Gas Lease Sales, Western Planning Area Lease Sale 233 and Central Planning Area Lease Sale 231 AGENCY: Bureau of Ocean... proposed Western Planning Area (WPA) Lease Sale 233 and Central Planning Area (CPA) Lease Sale 231...

  17. Cost accounting, management control, and planning in health care.

    Science.gov (United States)

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS) PMID:3284338

  18. 78 FR 5494 - Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith National...

    Science.gov (United States)

    2013-01-25

    ... National Park Service Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith...- Road Vehicle Management Plan (Plan), Lake Meredith National Recreation Area (LAMR), Texas. The Plan/DEIS evaluates the impacts of four alternatives that address off-road vehicle (ORV) management in...

  19. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  20. 75 FR 57056 - Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the...

    Science.gov (United States)

    2010-09-17

    ... viability of the existing elk herd and maintaining other management activities in the planning area. The... Bureau of Land Management Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the Fortification Creek Planning Area and Environmental Assessment, Wyoming AGENCY: Bureau of...

  1. Oak Ridge Reservation Waste Management Plan

    International Nuclear Information System (INIS)

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year

  2. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  3. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  4. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  5. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  6. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  7. Oak Ridge National Laboratory Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  8. Hanford site ground water protection management plan

    International Nuclear Information System (INIS)

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities

  9. 100 area excavation treatability test plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications.

  10. 75 FR 30426 - Notice of Availability of Record of Decision for the Kemmerer Resource Management Plan...

    Science.gov (United States)

    2010-06-01

    ... (ROD)/Approved Resource Management Plan (RMP) for the Kemmerer Field Office planning area located in... Bureau of Land Management Notice of Availability of Record of Decision for the Kemmerer Resource Management Plan/Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION: Notice...

  11. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  12. Geothermal resource area 3: Elko County. Area development plan

    Energy Technology Data Exchange (ETDEWEB)

    Pugsley, M.

    1981-01-01

    Geothermal Resource Area 3 includes all of the land in Elko County, Nevada. There are in excess of 50 known thermal anomalies in this area. Several of the more major resources have been selected for detailed description and evaluation in this Area Development Plan. The other resources are considered too small, too low in temperature, or too remote to be considered for development in the near future. Various potential uses of the energy found at each of the studied resource sites in Elko County were determined after evaluating the area's physical characteristics; the land ownership and land use patterns; existing population and projected growth rates; transportation facilities and energy requirements. These factors were then compared with resource site specific data to determine the most likely uses of the resource. The uses considered in this evaluation were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories several subdivisions were considered separately. It was determined that several of the geothermal resources evaluated in the Area Development Plan could be commercially developed. The potential for development for the seven sites considered in this study is summarized.

  13. Reduction of radiation area project plan

    International Nuclear Information System (INIS)

    This plan deals with the overall reduction of outdoor surface radiation areas under Rockwell's jurisdiction. Four basic alternatives are identified which will reduce and/or stabilize radiation areas until long-term disposal decisions are made: (1) continued routine surveillance and maintenance; (2) reduction or elimination of effluent discharges; (3) improved site stabilization; and (4) site removal. The four major transport mechanisms at Hanford that are the primary forces for contamination spread are identified as wind, animal transport, concentration and dispersal by plants, and transport resulting from human activities

  14. Fire management plan Modoc National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to initiate the integrated program of fire management. Component management actions will include suppression (including the appropriate...

  15. Mingo National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mingo National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  16. Lower Hatchie Forest Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lower Hatchie National Wildlife Refuge Forest Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources...

  17. Montezuma National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Montezuma National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  18. Agassiz National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  19. Fire Management Plan and Environmental Assessment 2001

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fire Management Plan outlines and details all of the refuge objectives for prescribed burns for the 1991 calendar year. It includes new fire management...

  20. Fisheries Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fisheries Management Plan for Muscatatuck NWR provides an introduction to the Refuge, summarizes the relationship of fishery management to Refuge objectives,...

  1. Water Management Plan Recommendations for 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This memorandum outlines the management strategy for water level management on St. Vincent Island in 2007. A table of planned water levels for each month is...

  2. Muscatatuck National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  3. Sabine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sabine NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  4. Data management implementation plan for the site characterization of the Waste Area Grouping 1 Groundwater Operable Unit at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    The Waste Area Grouping (WAG) 1 Groundwater Operable Unit (OU) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, is undergoing a site characterization. This project is not mandated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); therefore, no formalized meetings for data quality objective (DQO) development were held. Internally, DQOs were generated by the project team based on the end uses of the data to be collected. The 150-acre WAG 1 is contained within the ORNL security area. It includes all of the former ORNL radioisotope research, production, and maintenance facilities; former waste management areas; and some former administrative facilities. The goal of the WAG 1 Groundwater Site Characterization is to provide the necessary data on the nature and extent of groundwater contamination with an acceptable level of uncertainty to support the selection of remedial alternatives and to identify additional data needs for future actions. Primary objectives for the site characterization are: (1) To identify and characterize contaminant migration pathways based on the collection of groundwater data; (2) to identify sources of groundwater contamination and evaluate remedial actions which could be implemented to control or eliminate these sources; and (3) To conduct groundwater monitoring in support of other OUs in WAG 1 and the ORNL Groundwater OU

  5. Data management implementation plan for the site characterization of the Waste Area Grouping 1 Groundwater Operable Unit at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Ball, T.S.; Nickle, E.B.

    1994-10-01

    The Waste Area Grouping (WAG) 1 Groundwater Operable Unit (OU) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, is undergoing a site characterization. This project is not mandated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); therefore, no formalized meetings for data quality objective (DQO) development were held. Internally, DQOs were generated by the project team based on the end uses of the data to be collected. The 150-acre WAG 1 is contained within the ORNL security area. It includes all of the former ORNL radioisotope research, production, and maintenance facilities; former waste management areas; and some former administrative facilities. The goal of the WAG 1 Groundwater Site Characterization is to provide the necessary data on the nature and extent of groundwater contamination with an acceptable level of uncertainty to support the selection of remedial alternatives and to identify additional data needs for future actions. Primary objectives for the site characterization are: (1) To identify and characterize contaminant migration pathways based on the collection of groundwater data; (2) to identify sources of groundwater contamination and evaluate remedial actions which could be implemented to control or eliminate these sources; and (3) To conduct groundwater monitoring in support of other OUs in WAG 1 and the ORNL Groundwater OU.

  6. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  7. Implementing the European flood risk management plan

    NARCIS (Netherlands)

    Thomas, Hartmann; Spit, Tejo

    2015-01-01

    In response to the extreme flood events of recent decades, the European Union has released the Floods Directive (2007/60/EC), which requires the creation of flood risk management plans. These plans do not yet exist in practice, as water management agencies have until 2015 to put them into action. Th

  8. Fresno/Clovis water management plan

    International Nuclear Information System (INIS)

    The Fresno/Clovis Metropolitan Area (FCMA) has historically relied solely on untreated undisinfected groundwater as a source of potable water to serve its 500,000 people. Contamination was discovered in some wells in the late 1970s, and cones of depression in areas of heavy pumping have caused contaminants to spread within the basin. Recent data indicate that at least 44 of the 352 public water agency wells in the FCMA have already been deactivated because of groundwater quality degradation. Major plumes of groundwater contamination occur throughout the study area. Most of the agricultural contaminants in the FCMA groundwater are the consequence of routine pesticide application over thousands of acres of surrounding farmland. Commercial and industrial contaminants are primarily due to poor storage and handling practices, careless or improper disposal, and leaking underground tanks. Recent and anticipated water quality regulations will probably require some form of wellhead treatment at every public water agency well in the FCMA. Such treatment may consist of disinfection, corrosion control, and the removal of radionuclides and organic chemicals. Many of the well sites are not sized, located, or configured to accommodate wellhead treatment. Potable water distribution systems in the FCMA were constructed based on dispersed wells and a local distribution network of relatively small water mains. A technical advisory committee (TAC) was formed in 1984 to promote a cooperative water planning effort. The TAC is composed of the five major water agencies in the metropolitan area: the Cities of Fresno and Clovis, Fresno County, the Fresno Metropolitan Flood Control District (FMFCD), and the Fresno Irrigation District (FID). The TAC prepared the work plan and, in August of 1991, selected CH2M HILL to develop the Fresno/Clovis Water Resources Management Plan

  9. 50 CFR 665.98 - Management area.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Management area. 665.98 Section 665.98 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION... Management area. The American Samoa fishery management area is the EEZ seaward of the Territory of...

  10. PLANNING AND MANAGING VIRTUALIZED NEXT GENERATION NETWORKS

    Directory of Open Access Journals (Sweden)

    Sukant K. Mohapatra

    2015-11-01

    Full Text Available Service convergence, content digitization, rapid and flexible service delivery, reduction of capital and operating costs, economies of scale, changes in telecom policy and regulation, and ever increasing competition have been key factors in the evolution of virtualized Next Generation Networks (vNGN. IPcentric converged networks aim to provide a multitude of services over a single network infrastructure. Tremendous success and benefit of server virtualization in data centers is driving the adaption of network virtualization. Network virtualization is applicable to enterprise data center, and enterprise as well as wide area networks. The focus of this paper is network virtualization aspects of service providers’ next generation network. The key factors for moving to virtualized network is optimal use and sharing of network infrastructure even among competitive service providers, programmability of network and rapid introduction of new service and standard based on open platform rather than proprietary implementation. Evolving Software Defined Network (SDN and Network Function Virtualization (NFV shall enable common network infrastructure sharing, control, and management at a higher layer thus making network devices more generic and less intelligent, thus enabling cost competitiveness and quick service delivery. Network virtualization shall enable key benefits such as lower cost, flexibility, efficiency, and security, However, the deployment of virtualized next generation networks has brought its unique challenges for network managers and planners, as the network has to be planned in a comprehensive way with effective management of virtual network elements, its correlation with physical infrastructure and monitoring of control functions and server platforms. This paper discusses generic next generation network, its virtualization, and addresses the challenges related to the planning and managing of virtualized next generation networks. This

  11. Project Management Plan (PMP) for Work Management Implementation

    Energy Technology Data Exchange (ETDEWEB)

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  12. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  13. Integrated Pest Management Plan : Kulm Wetland Management District 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals...

  14. Integrated Pest Management Plan Kulm Wetland Management District 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals...

  15. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  16. 200 Area Liquid Effluent Facilities -- Quality assurance program plan

    International Nuclear Information System (INIS)

    This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements

  17. TECHNICAL INTEGRATION ENVIRONMENTAL MANAGEMENT FOCUS AREAS

    Energy Technology Data Exchange (ETDEWEB)

    Carey R. Butler

    2001-10-01

    This contract involved a team of companies led by WPI (formerly the Waste Policy Institute). In addition to WPI, the team included four subcontractors--TRW (formerly BDM Federal), SAIC, Energetics, and the University of North Dakota Energy and Environmental Research Center (EERC). The team of companies functioned as a ''seamless team'' assembled to support the Environmental Management Program Focus Areas. Staff resources were applied in the following offices: Richland, Washington, Idaho Falls, Idaho, Morgantown, West Virginia, Grand Forks, North Dakota, Aiken, South Carolina, Gaithersburg, Maryland, and Blacksburg, Virginia. These locations represented a mixture of site support offices at the field focus area locations and central staff to support across the focus areas. The management of this dispersed resource base relied on electronic communication links to allow the team to function as a ''virtual office'' to address tasks with the best qualified staff matched to the task assignments. A variety of tasks were assigned and successfully completed throughout the life of the contract that involved program planning and analysis, program execution, program information management and communication and data transmission.

  18. Manejo y gestión de áreas históricas: el Plan Maestro de La Habana Vieja 1995-96. /Handling and management of historic areas. The Master Plan 1995-96 Old Havana.

    Directory of Open Access Journals (Sweden)

    Muñoz Köhler, Vico

    1999-12-01

    Full Text Available Mucho ha sido dicho en La Habana acerca del manejo y la gestión de áreas históricas. Sin embargo, el caso cubano, a diferencia de otros ejemplos, necesitará de un preámbulo de pasos complejos que deben ser resueltos, antes de encarar la gestión barrial propiamente tal./Much has been said in Havana about the handling and management of historic areas. However, the Cuban case ─unlike others cases─ need a preamble of complex steps that must be resolved before addressing the management of the districts itself.

  19. [Evaluation model for municipal health planning management].

    Science.gov (United States)

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  20. Hawaii ESI: MGT (Management Area Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains management area data for artificial reefs, designated critical habitats, national parks, marine sanctuaries, special management areas,...

  1. American Samoa ESI: MGT (Management Area Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains management area data for special management areas, marine parks, marine sanctuaries, national parks, and wildlife refuges in American Samoa....

  2. 78 FR 42970 - Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior...

    Science.gov (United States)

    2013-07-18

    ... existing 1981 Southwest Planning Area Management Framework Plan and portions of the 1986 Central Yukon RMP..., Evaluation, Planning, and Management; 15. The BLM will incorporate Environmental Justice considerations in... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan for the Bering...

  3. Digital Offshore Cadastre (DOC) – Pacific83 – Planning Area Outlines

    Data.gov (United States)

    Bureau of Ocean Energy Management, Department of the Interior — This data set contains BOEM Planning Area outlines in ESRI Arc/Info export and Arc/View shape file formats for the BOEM Pacific Region. The use of Planning Areas...

  4. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite...

  5. 78 FR 13316 - National Forest System Land Management Planning Directives

    Science.gov (United States)

    2013-02-27

    ... Forest Service RIN 0596-AD06 National Forest System Land Management Planning Directives AGENCY: Forest...) land management planning regulation. Issuance of these proposed directives will provide consistent... CONTACT: Annie Eberhart Goode, Planning Specialist, Ecosystem Management Coordination Staff,...

  6. 75 FR 49514 - Notice of Availability for the Little Snake Proposed Resource Management Plan and Final...

    Science.gov (United States)

    2010-08-13

    ... multiple resource use in the planning area by protecting sensitive resources, including high priority... mineral estate. The Little Snake Field Office area is currently being managed under its 1989 RMP, which... planning area. Alternative B would allow the greatest extent of resource use within the planning...

  7. 300 Area solvent evaporator closure plan

    International Nuclear Information System (INIS)

    This document describes activities for the closure of a dangerous waste treatment tank facility, owned and operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (Westinghouse Hanford). This tank treatment facility is the 300 Area Solvent Evaporator (300 ASE), which was located in the 300 Area of the Hanford Site from 1975 to 1986, and was managed for the DOE-RL by UNC Nuclear Industries, Incorporated. The 300 ASE evaporator unit was a modified load lugger (dumpster) in which solvent wastes were evaporated, and the adjacent 333 East Concrete Pad, where 55-gallon barrels of waste solvents were temporarily stored while awaiting liquid transfers into the evaporator. 26 refs., 14 figs., 6 tabs

  8. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia;

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  9. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... or jurisdiction. The paper then identifies the different means of planning control such as a centralized versus a decentralized approach and planning led versus a market marked led approach. This is presented in a European context through a short overview of the various planning systems that reflect...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...

  10. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  11. A groundwater management plan for Stuttgart.

    Science.gov (United States)

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater.

  12. A groundwater management plan for Stuttgart.

    Science.gov (United States)

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater. PMID:26524995

  13. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  14. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  15. Russian River Interim Action Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — An interim action plan is presented to guide the 1979 management of the Kenai National Moose Range's portion of the lower Russian River and its confluence with the...

  16. Cropland Management Plan: Louisa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Louisa National Wildlife Refuge Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at...

  17. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    Energy Technology Data Exchange (ETDEWEB)

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  18. Cropland Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  19. Cropland Management Plan: Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  20. Gulf of Maine Tern Management Plan 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following management plan provides an outline of the tasks proposed to restore tern numbers to levels approximating those reached during the last period of...

  1. Agassiz National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  2. Crop Management Plan: Sherburne National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sherburne NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  3. Fire Management Plan : Ottawa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains the Finding of No Significant Impact (FONSI) and the Environmental Assessment (EA) for the Ottawa NWR Fire Management Plan. A description of...

  4. Agassiz National Wildlife Refuge : Safety Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of this Safety Management Plan are to identify and define safety hazards that may be encountered on Agassiz Refuge and the procedures to be followed...

  5. 1991-92 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi River National Wildlife and Fish Refuge – McGregor District Water Management Plan has been developed to meet the station objectives set forth...

  6. Cropland Management Plan Dahomey National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Dahomey NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  7. Meredosia National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Meredosia National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at...

  8. Merced National Wildlife Refuge water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The details of this plan are separated into ten sections: Background, Water Management Related Goals and Objectives, Policies and Procedures, Inventory and Existing...

  9. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management... of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the...

  10. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be...

  11. Peculiarities of planning and managing tourism system

    OpenAIRE

    Гопенене, Р.; Христаускас, Чесловас

    2015-01-01

    Stages of process of planning and managing tourism system have been considered as well as potential possibilities of tourist region competiveness, which are to be identified while planning the tourism development in the region, have been distinguished. The methodology of planning tourism system and preparing strategies has been presented. Cooperation of system’s internal constituents has to become the basis of creating the regional tourism system, which produce the total tourist product in th...

  12. Draft of the PHENIX Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  13. Draft of the PHENIX Management Plan

    International Nuclear Information System (INIS)

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants

  14. Do You Have a Crisis Management Plan?

    Science.gov (United States)

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  15. 77 FR 51568 - Outer Continental Shelf, Gulf of Mexico, Oil and Gas Lease Sales, Western Planning Area Lease...

    Science.gov (United States)

    2012-08-24

    ... and Central Planning Area (CPA) Lease Sale 231 (WPA/CPA Supplemental EIS) (77 FR 40380). Due to a BOEM... Bureau of Ocean Energy Management Outer Continental Shelf, Gulf of Mexico, Oil and Gas Lease Sales, Western Planning Area Lease Sale 233 and Central Planning Area Lease Sale 231 AGENCY: Bureau of...

  16. Incentive pay plans boost managers' performance.

    Science.gov (United States)

    Biggs, D P

    1987-03-01

    Incentive compensation, which has become commonplace in highly competitive industries, is gradually being introduced in health care settings. Although it has not been used extensively in not-for-profit hospitals, its advantages make it a natural tool for administrators who want to retain their best managers and to achieve important special objectives. Management incentives--awards based on the accomplishment of special objectives--enable boards of trustees and senior managers not only to meet difficult hospital objectives but also to attract and motivate key managers and to promote participative management and teamwork. An effective management incentive compensation program requires five support systems: strategic and operating plans; annual objectives for each manager derived from the strategic and operating plans; measureable performance standards; management action plans, which incorporate the objectives and performance standards and are used in directing each manager's efforts; and a performance evaluation system that forces tough yet reasonable evaluations. In addition to these systems, senior managers must exhibit commitment to change, and objectives must go beyond simply managing individual units well, targeting such goals as improvement of outpatient care utilization, recruitment of specialized staff physicians, and the creation of preferred provider and health maintenance organizations. PMID:10280978

  17. Marsh and Water Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck NWR Marsh and Water Management Plan outlines marsh and water management planning objectives, marsh management consideration, management of...

  18. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    The 1950s marked the birth of comprehensive planning in Denmark, when a number of socio-spatial challenges emerged as a result of the country’s rapid economic growth. These challenges were eventually addressed by the administrative reform of 1970 and the following planning reform implemented from...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth....

  19. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  20. Spent Nuclear Fuel Project Document Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed.

  1. Public accountability in planning for new housing areas

    NARCIS (Netherlands)

    Kang, V.; Korthals Altes, W.K.

    2015-01-01

    Planning new housing areas involves balancing many interests and local authorities must make decisions in a way that is accountable. Formal accountability is organised differently in plan-led and development-led planning systems. In plan-led systems, accountability relates to the question of whether

  2. 44 CFR 60.22 - Planning considerations for flood-prone areas.

    Science.gov (United States)

    2010-10-01

    .... (a) The flood plain management regulations adopted by a community for flood-prone areas should: (1... plain management regulations, each community shall consider at least the following factors— (1) Human..., regional and local comprehensive plans and flood plain management programs; (17) Requirement of pilings...

  3. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  4. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  5. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  6. 78 FR 15041 - Notice of Availability of the Draft Miles City Resource Management Plan and Environmental Impact...

    Science.gov (United States)

    2013-03-08

    ... be managed to enhance and protect cultural resources. Management actions proposed for this area are... analyze and update public land and resource management objectives within the planning area. The planning...-Grouse protection priority areas. The 21 areas proposed for designation and the resource use...

  7. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  8. Environmental Development Plan: Defense Waste Management

    International Nuclear Information System (INIS)

    This Environmental Development Plan (EDP) encompasses the programmatic and environmental, health and safety considerations associated with the handling of DOE wastes generated primarily as a byproduct of the DOE national defense programs. The Defense Waste Management Program and the Commercial Waste Manageent (CWM) Program deal with similar technologies pertaining to waste processing, immobilization, packaging, burial, and disposal. However, commercial waste activities are addressed in a separate EDP and are considered in this EDP to the extent that such activities are common to the Defense Waste Management Program. This plan does not address mining and milling tails, transportation of wastes, decommissioning and decontamination (D and D) programs or safeguards, security, and profliferation aspects

  9. Productivity enhancement planning using participative management concepts

    Science.gov (United States)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  10. The Dean as Manager: Strategic Planning for the Library School.

    Science.gov (United States)

    Carrigan, Dennis

    1988-01-01

    Examination of the importance of management in library schools discusses two problem areas in the library school environment--the parent university and society beyond the university. The need for strategic planning which includes an assessment of the environment is emphasized. (Six references) (MES)

  11. Spatial Water Management: Supporting Participatory Planning and Decision Making

    NARCIS (Netherlands)

    Goosen, H.

    2006-01-01

    This thesis introduces the reader to the new Dutch policy of water management, which combines conventional water engineering with a new policy which incorporates planning for flood areas. As this new policy has larger socio-economic implications and involves more stakes and stakeholders, implementin

  12. Information Value Distance and Crisis Management Planning

    Directory of Open Access Journals (Sweden)

    Brahim Herbane

    2014-04-01

    Full Text Available Organizational learning during and post-crisis is well established in the management literature but consideration of learning for crisis and the sources of information perceived to be useful for crisis management planning have not previously been examined. This study evaluates data from 215 U.K.-based small- and medium-sized enterprises (SMEs about the perceived value of 11 sources of information between planning (i.e., firms with a crisis management plan and non-planning respondents. For planning firms, the information sources considered to be useful are exclusively experience-based, and when information sources become less idiosyncratic and episodic, planning firms’ evaluations of their value begin to approximate the ratings given by non-planning firms. Furthermore, the concepts of relative value distance and value distance from threshold are original features of this study and offer new ways to evaluate the value of information sources for organizations wishing to provide information and support to improve business resilience and business continuity.

  13. Construction contractors involvement in disaster management planning

    Directory of Open Access Journals (Sweden)

    Peter Stringfellow

    2014-06-01

    Full Text Available Disasters, both natural and man-made, cause major damage and loss of life. Because of this, governments around the world are looking at building resilience to ensure communities can recover quickly and have minimal impact from a disaster. Part of building resilience is to plan for disaster management and recovery. Literature reveals that construction contractors can play a critical role within this process as they have control of resource supply chains and key knowledge and skills they are well suited to assist in disaster planning. However, as literature also reveals there is currently little involvement of construction contractors in the disaster planning process. This gap between what should be done and what is currently done is investigated. Representatives from industry bodies are interviewed to determine their understanding of the industry’s involvement in disaster planning and what capacity the industry might have to be involved. The interviewee’s responses agree with current literature that there is currently little or no involvement with disaster planning however there is interest in being involved with disaster management planning if there was a forum for this to occur. Based on the responses the researcher has proposed a model to engage construction contractors within state government disaster management planning.

  14. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No. 68 / Monday, April 9, 2012... National Forest System Land Management Planning AGENCY: Forest Service, USDA. ACTION: Final rule and record... land management planning rule (planning rule). The new planning rule guides the development,...

  15. Myopia management: multihospital portfolio planning.

    Science.gov (United States)

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  16. Examination of Federal Data Management Plan Guidelines

    Directory of Open Access Journals (Sweden)

    Jennifer L. Thoegersen

    2015-06-01

    Full Text Available Data management plans as expectations of the grant proposal process are still fairly novel, and the expected format and content of these plans is still evolving. The objective of this research is to gain a greater understanding of the expected content for data management plans submitted as part of grant proposals to federal funding agencies. This paper examines federal funding agencies’ data management plan guidelines in relation to the broad elements of data management identified by the Interagency Working Group on Digital Data: Description, Impact, Content & Format, Protection, Preservation, Access, and Transfer of Responsibility. Specifically, statements in agencies’ guidelines were categorized into the most applicable category (or categories. The representation of each category within each agency’s guidelines was addressed, and the statements falling in each category were analyzed. Some categories, including Access and Preservation, were represented in all or nearly all of the guidelines examined. Other categories—Impact and Transfer of Responsibility—were rarely addressed. The expectations for data management plans are evolving and will likely continue to evolve as more agencies require them.

  17. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  18. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4)...

  19. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Forest Service 36 CFR Part 219 RIN 0596-AB86 National Forest System Land Management Planning; Correction...-1104. FOR FURTHER INFORMATION CONTACT: Ecosystem Management Coordination staff's Planning Specialist... management plans (the planning rule). The National Forest Management Act (NFMA) at 16 U.S.C....

  20. Gestión ambiental para el ordenamiento territorial del Partido de Florencio Varela, Area Metropolitana de Buenos Aires Environmental management of the territorial planning for the district of Florencio Varela, Buenos Aires Metropolitan Area

    Directory of Open Access Journals (Sweden)

    Irma S Rivas

    2010-06-01

    Full Text Available El tema de la agricultura periurbana adquiere gran importancia en el ordenamiento del territorio, ya que comprende cuestiones que afectan tanto el uso actual del suelo como su proyección en el futuro. Las zonas periurbanas con un fuerte potencial de crecimiento afrontan temas problemáticos entre los que se destacan la sustentabilidad urbana y la seguridad alimentaria de la población. El 65% del Partido de Florencio Varela, ubicado en la segunda corona del área metropolitana de Buenos Aires corresponde a tierras rurales. Esta característica adquiere gran relevancia como elemento facilitador para un proyecto que consolide al Partido de Florencio Varela dentro del "cinturón verde" periurbano. La presente propuesta de gestión promueve la producción orgánica intensiva en la zona periurbana rural del Partido de Florencio Varela incentivando la generación de trabajo y de arraigo y recuperando el desarrollo local, con producciones que atiendan al abastecimiento local mediante la creación de un Mercado Cooperativo. El marco de la propuesta toma como referencia la configuración geologica superficial y de los suelos y la estructura socioeconómica del área metropolitana de Buenos Aires con la finalidad de lograr un desarrollo sustentable del periurbano agrícola del Partido de Florencio Varela. Contempla también varias acciones asociadas que intentan resolver importantes cuestiones como: 1 Recuperación de suelos decapitados mediante la utilización de compost obtenidos de basurales de la zona; 2 Capacitación laboral para reinserción de mano de obra desocupada e implementación del sistema de producción orgánica en la población rural de la zona; 3 Mejoramiento de la calidad alimentaria de la población y 4 Control del crecimiento indiscriminado de la "mancha urbana" del área metropolitana de Buenos Aires.Periurban Farming has become a relevant issue for the territorial planning because it involves matters that affect not only the

  1. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and

  2. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  3. Marsh and Water Management Plan for the Delair Division, Mark Twain NWR

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Marsh and Water Management Plan for the Delair Division of Mark Twain NWR provides a description of the area, water management history, refuge objectives,...

  4. 75 FR 4413 - Notice of Intent to Prepare an Environmental Impact Statement for a General Management Plan...

    Science.gov (United States)

    2010-01-27

    ... managing the area during the next 15 to 20 years. The plan will prescribe desired resource conditions and... alternatives for managing the park will be developed through this planning process and will include, at...

  5. Range ecosystem management for natural areas

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report describes methods for managing range ecosystems in natural areas. Preserved natural areas on rangeland may, in a short time, be only those which...

  6. Southeast Alaska ESI: MGT (Management Area Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains management area data for National Parks, Wildlife Refuges, and areas designated as Critical Habitat in Southeast Alaska. Vector polygons in...

  7. An investigation of management succession planning in black–owned family business in selected areas in South Africa / by M. Tanzwani

    OpenAIRE

    Tanzwani, Mashaka

    2010-01-01

    The objective of this study is to investigate management succession in black–owned family businesses in South Africa. The study was conducted in two Provinces, namely Limpopo and the North–West. In the Limpopo province, the study was conducted in the Vhembe District. The Vhembe district is consists of four municipalities, i.e. Thulamela, Mutale, Musina and Makhado. In the North–West province, the study was conducted in the Bojanala District. The Bojanala district has three m...

  8. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  9. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  10. Data Management Facility Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  11. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  12. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the

  13. Double-O Habitat Management Plan: Malheur National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Double-0 Plan is a step-down plan of the 1985 Refuge Master Plan and Environmental Assessment. The purpose of this plan is to guide the management, protection,...

  14. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  15. BUSINESS PLAN AS A MANAGEMENT TOOL

    Directory of Open Access Journals (Sweden)

    BRAG Ă FILOFTEIA VIORICA

    2013-02-01

    Full Text Available Most business people think of the business plans when they starting a new business or submitting documentation for accessing the funding source. The business plan involves a thinking perspective on the business, beginning from the set objectives, includes all the stages and resources they need to achieve them over a period of time. Therefore, in this article, we emphasize that they are equally useful for the daily management of a business, even if a business needs or not the new investment. Businesses need plans to optimize the growth and the development in accordance with the priorities.

  16. An Integrated Risk Management Model for Source Water Protection Areas

    OpenAIRE

    Shang-Lien Lo; Pei-Te Chiueh; Wei-Ting Shang

    2012-01-01

    Watersheds are recognized as the most effective management unit for the protection of water resources. For surface water supplies that use water from upstream watersheds, evaluating threats to water quality and implementing a watershed management plan are crucial for the maintenance of drinking water safe for humans. The aim of this article is to establish a risk assessment model that provides basic information for identifying critical pollutants and areas at high risk for degraded water qual...

  17. 300 Area Building Retention Evaluation Mitigation Plan

    Energy Technology Data Exchange (ETDEWEB)

    D. J. McBride

    2007-07-03

    Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.

  18. Management strategies in hospitals: scenario planning

    OpenAIRE

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated defi...

  19. Hanford site integrated pest management plan

    Energy Technology Data Exchange (ETDEWEB)

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  20. Land Protection Plan: Rocky Mountain Front Conservation Area Expansion

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Land Protection Plan for Rocky Mountain Front Conservation Area provides a description of the project, a description of the area and its resources, threats to...

  1. Land Protection Plan: Sangre de Cristo Conservation Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Land Protection Plan for Sangre de Cristo Conservation Area provides a description of the project, a description of the area and its resources, threats to the...

  2. Suisun Marsh Primary Management Area

    Data.gov (United States)

    California Department of Resources — Suisun Marsh or the 'Marsh' means tidal marsh, water-covered areas, diked-off wetlands, seasonal marshes, lowland grasslands, upland grasslands, and cultivated...

  3. Suisun Marsh Secondary Management Area

    Data.gov (United States)

    California Department of Resources — Suisun Marsh or the 'Marsh' means tidal marsh, water-covered areas, diked-off wetlands, seasonal marshes, lowland grasslands, upland grasslands, and cultivated...

  4. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  5. History of the Wildlife Areas Iroquois National Wildlife Refuge, Oak Orchard Wildlife Management Area, Tonawanda Wildlife Management Area, John White Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report provides a history of four management areas in Western New York: Iroquois National Wildlife Refuge, Oak Orchard Management Area, Tonawanda Wildlife...

  6. Management Matters: Planning Goals and Time

    Science.gov (United States)

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  7. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  8. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...

  9. Hanford emergency management plan - release 15

    International Nuclear Information System (INIS)

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety

  10. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  11. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137CsCl and 90SrF2, stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  12. Comprehensive Conservation Plan: Huron Wetland Management District, Madison Wetland Management District, Sand Lake Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Huron Wetland Management District, Madison Wetland Management District, and Sand Lake...

  13. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  14. Strategic planning manager and management education in elementary education institutions

    Directory of Open Access Journals (Sweden)

    Kleeder José Bracho Pérez

    2013-10-01

    Full Text Available The purpose of this study was to determine the relationship between strategic planning and management of educational managers in primary schools of the parish municipality of Ricaurte Mara. The research was based on the theoretical bases of authors: Serna (2003, Chiavenato (2001, and Weihrich Koantz (2004, Pacheco, chestnut and Caicedo (2002 among others. The research was descriptive correlational design under a nonexperimental transactional field, the population consisted of 115 subjects between administrators and teachers, which the sample was taken and Tamayo Tamayo criterion; census. Data collection was conducted through two questionnaires (Brad for managers and (Brad for teachers each consisting of 42 items in Likert-type scale with four answer choices, which was validated by five experts and the reliability was calculated through Cronbach alpha coefficient was the result of which (0.95 for the questionnaire (Brad applied to directors and (0.90 for the questionnaire (Brad applied to teachers. The statistic used was descriptive using percentage tables. The results determined that the application of strategic planning by educational managers is low so there are weaknesses in management, we can say that there is a very high correlation (r = 0.89 between strategic planning and management of the educational manager in primary schools of the parish municipality of Ricaurte Mara. 

  15. Managing Risk Areas in Software Development Offshoring

    DEFF Research Database (Denmark)

    Persson, John Stouby; Schlichter, Bjarne Rerup

    2015-01-01

    Software companies are increasingly offshoring development to countries with high expertise at lower cost. Offshoring involves particular risk areas that if ignored increase the likelihood of failure. However, the offshoring client’s maturity level may influence the management of these risk areas....... Against this backdrop, we present an interpretive case study of how managers perceive and mitigate the risk areas in software development offshoring with a mature CMMI level 5 (Capability Maturity Model, Integrated) software company as the client. We find that managers perceive and mitigate most...... of the offshoring risk areas in accordance with the findings of previous research. However, the risk area of task distribution is a notable exception. In this case, managers perceive high task uncertainty, equivocality, and coupling across sites as risk mitigation rather than risk taking. The paper discusses how...

  16. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  17. AVLIS Production Plant Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  18. Black-tailed prairie dog management plan : Rainwater Basin Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan is for management of black-tailed prairie dogs on the Rainwater Basin Wetland Management District , Nebraska. A management plan is needed for...

  19. Communication Plan and Management in Change Project

    OpenAIRE

    Raito, Katriina

    2010-01-01

    This thesis case study describes how a communication plan is made for a change project which has an effect on more than a hundred employees. The project for which I did a communication plan and management was about a company’s IT process and process-related project. The purpose of the project was to develop the current as-is process and process tools so they would be based on a global process framework. In the first part of this thesis report I have introduced a few communication theories...

  20. Optical Networks Solutions planning - performances - management

    DEFF Research Database (Denmark)

    Fenger, Christian

    2002-01-01

    are kept optical and not converted into the optical domain. The focus is on the scientific results achieved throughout the Ph.D. period. Five subjects – all increasing the understanding of optical networks – are studied. Static wavelength routed optical networks are studied. Management on terms...... is up to two wavelengths, significant capacity savings are possible. Network planning in the form of optimal design of national and regional telecommunication networks is thoroughly studied and promising computer programs and methods are developed. In the optimization process are both duct, fiber......, and switch equipment cost considered. The contribution in network planning are one of the most important contributions with direct usability....

  1. National NIF Diagnostic Program Interim Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  2. 78 FR 66064 - Notice of Intent To Prepare a Livestock Grazing Monument Management Plan Amendment and Associated...

    Science.gov (United States)

    2013-11-04

    ... GSENM administers grazing. Management decisions for lands in the planning area, but outside the GSENM... legislation and management plans, as appropriate. NPS will also be making a decision for the GCNRA lands... EIS process: The Plan Amendment will be limited to making land use planning decisions specific...

  3. Simulated Annealing for Location Area Planning in Cellular networks

    OpenAIRE

    Prajapati, N. B.; R. R. Agravat; Hasan, M I

    2010-01-01

    LA planning in cellular network is useful for minimizing location management cost in GSM network. In fact, size of LA can be optimized to create a balance between the LA update rate and expected paging rate within LA. To get optimal result for LA planning in cellular network simulated annealing algorithm is used. Simulated annealing give optimal results in acceptable run-time.

  4. Simulated Annealing for Location Area Planning in Cellular networks

    Directory of Open Access Journals (Sweden)

    N. B. Prajapati

    2010-03-01

    Full Text Available LA planning in cellular network is useful for minimizing location management cost in GSM network. Infact, size of LA can be optimized to create a balance between the LA update rate and expected pagingrate within LA. To get optimal result for LA planning in cellular network simulated annealing algorithmis used. Simulated annealing give optimal results in acceptable run-time.

  5. 78 FR 45266 - Notice of Intent To Prepare a Resource Management Plan for the Oklahoma, Kansas, and Texas...

    Science.gov (United States)

    2013-07-26

    ... incorporate, where applicable, management decisions brought forward from existing planning documents. 6... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan for the Oklahoma, Kansas, and Texas Planning Area and an Associated Environmental Impact Statement AGENCIES: Bureau of...

  6. State Wildlife Management Area Boundaries - Publicly Accessible

    Data.gov (United States)

    Minnesota Department of Natural Resources — This polygon theme contains boundaries for approximately 1392 Wildlife Management Areas (WMAs) across the state covering nearly 1,288,000 acres. WMAs are part of...

  7. Virginia ESI: MGT (Management Area Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains boundaries for management areas, national parks, state and local parks, and wildlife refuges in Virginia. Vector polygons in this data set...

  8. Western Alaska ESI: MGT (Management Area Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains management area data for Designated Critical Habitats, Wildlife Refuges, Wild and Scenic Rivers, and State Parks. Vector polygons in this...

  9. Louisiana ESI: PARISH (Parish Management Area Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains boundaries for parishes in coastal Louisiana. Vector polygons in this data set represent parish management areas. Location-specific type and...

  10. Bureau of Land Management Wilderness Study Areas

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — This dataset is meant to depict Wilderness Study Areas (WSA's), within the state of New Mexico, identified by the U.S. Bureau of Land Management (BLM) as having...

  11. Alabama ESI: MGT (Management Area Polygons)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive human-use data for designated critical habitats, state parks, wildlife refuges, and wildlife management areas in Alabama. Vector...

  12. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K.; Green, T. M.

    2014-10-01

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.

  13. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  14. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  15. Strategic plan for Hanford site information management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE.

  16. Estimating management costs of protected areas

    DEFF Research Database (Denmark)

    Green, Jonathan M.H.; Burgess, Neil David; Green, Rhys E.;

    2012-01-01

    Despite chronic underfunding for conservation and the recognition that funds must be invested wisely, few studies have analysed the direct costs of managing protected areas at the spatial scales needed to inform local site management. Using a questionnaire survey we collected data from protected ...

  17. Des Lacs National Wildlife Refuge Water Management Plan 1966

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  18. Des Lacs National Wildlife Refuge Water Management Plan 1961

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  19. Des Lacs National Wildlife Refuge Water Management Plan 1958

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  20. Des Lacs National Wildlife Refuge Water Management Plan 1968

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  1. Des Lacs National Wildlife Refuge Water Management Plan 2013

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs NWR Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  2. Des Lacs National Wildlife Refuge Water Management Plan 1993

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  3. Des Lacs National Wildlife Refuge Water Management Plan 1965

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  4. Des Lacs National Wildlife Refuge Water Management Plan 1957

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  5. Des Lacs National Wildlife Refuge Water Management Plan 1964

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  6. Des Lacs National Wildlife Refuge Water Management Plan 1970

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  7. Des Lacs National Wildlife Refuge Water Management Plan 1962

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  8. Des Lacs National Wildlife Refuge Water Management Plan 2008

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs NWR Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  9. Des Lacs National Wildlife Refuge Water Management Plan 1969

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  10. Des Lacs National Wildlife Refuge Water Management Plan 2014

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs NWR Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  11. Des Lacs National Wildlife Refuge Water Management Plan 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs NWR Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  12. Des Lacs National Wildlife Refuge Water Management Plan 1967

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  13. Des Lacs National Wildlife Refuge Water Management Plan 1963

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  14. Des Lacs National Wildlife Refuge Water Management Plan 1956

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  15. Des Lacs National Wildlife Refuge Water Management Plan 2010

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs NWR Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  16. Des Lacs National Wildlife Refuge Water Management Plan 1960

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  17. Des Lacs National Wildlife Refuge Water Management Plan 2009

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs NWR Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  18. Des Lacs National Wildlife Refuge Water Management Plan 2011

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs NWR Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  19. Des Lacs National Wildlife Refuge Water Management Plan 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs NWR Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  20. Des Lacs National Wildlife Refuge Water Management Plan 1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  1. Des Lacs National Wildlife Refuge Water Management Plan 1998

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. This plan contains...

  2. Des Lacs National Wildlife Refuge Water Management Plan 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. This plan contains...

  3. Des Lacs National Wildlife Refuge Water Management Plan 2006

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. This plan contains 2005...

  4. Des Lacs National Wildlife Refuge Water Management Plan 1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. This plan contains...

  5. Des Lacs National Wildlife Refuge Water Management Plan 2002

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. This plan contains 2001...

  6. Des Lacs National Wildlife Refuge Water Management Plan 2016

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. This plan contains 2015...

  7. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  8. Comprehensive Conservation Plan: North Dakota Wetland Management Districts

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan CCP was written to guide management on North Dakota Wetland Management Districts for the next 15 years. This plan outlines the...

  9. Forest Management Plan : Upper Mississippi River Wildlife & Fish Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi National Wildlife and Fish Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest...

  10. Yukon Flats National Wildlife Refuge Fishery. Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Yukon Flats National Wildlife Refuge Fishery Management Plan (Fishery Plan) provides comprehensive management direction to insure that fish species and habitats...

  11. Ottawa National Wildlife Refuge : Integrated Pesticide Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Ottawa NWR Integrated Pest Management plan (IPM) is to provide a plan and a tool for adaptive management of invasive species on the Refuge. The...

  12. St. Croix Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on St. Croix Wetland Management District for the next 15 years. This plan outlines the...

  13. Rainwater Basin Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Rainwater Basin Wetland Management District for the next 15 years. This plan outlines...

  14. Windom Wetland Management District: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Windom Wetland Management District for the next 15 years. This plan outlines the...

  15. Comprehensive hatchery management plan: Carson National Fish Hatchery

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Hatchery Management Plan (CHMP) for the Carson National Fish Hatchery (NFH) is an operational management plan which outlines policy, legal...

  16. Morris Wetland Management District: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Morris Wetland Management District for the next 15 years. This plan outlines the...

  17. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  18. Characterization plan for Solid Waste Storage Area 6

    International Nuclear Information System (INIS)

    Solid Waste Storage Area 6 (SWSA-6) is the only currently operating low-level radioactive waste (LLW) shallow land burial facility at the Oak Ridge National Laboratory. The US Department of Energy (DOE) recently issued DOE Order 5820.2, which provides new policy and guidelines for the management of radioactive wastes. To ensure that SWSA-6 complies with this Order it will be necessary to establish whether sufficient data on the geology, hydrology, soils, and climatology of SWSA-6 exist, and to develop plans to obtain any additional information required. It will also be necessary to establish a source term from the buried waste and provide geochemical information for hydrologic and dosimetric calculations. Where data gaps exist, methodology for obtaining this information must be developed. The purpose of this Plan is to review existing information on SWSA-6 and develop cost estimates and schedules for obtaining any required additional information. Routine operation of SWSA-6 was initiated in 1973, and it is estimated that about 29,100 m3 (1,000,000 ft3) of LLW containing about 250,000 Ci of radioactivity have been buried through 1984. Since SWSA-6 was sited prior to enactment of current disposal regulations, a detailed site survey of the geologic and hydrologic properties of the site was not performed before wastes were buried. However, during the operation of SWSA-6 some information on site characteristics has been collected

  19. 76 FR 81487 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-12-28

    ... Area Power Administration Application of the Energy Planning and Management Program Power Marketing...-2017 marketing efforts, the Energy Management and Planning Program (Program), and the Conformed General...) published in the Federal Register on December 28, ] 1984 (49 FR 50582), are available at...

  20. 76 FR 23583 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-04-27

    ... Area Power Administration Application of the Energy Planning and Management Program Power Marketing... Planning and Management Program (Program) Power Marketing Initiative (PMI), as modified in this notice, to... (Conformed Criteria) published in the Federal Register (49 FR 50582) on December 28, 1984, are available...

  1. 76 FR 30147 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-05-24

    ... Area Power Administration Application of the Energy Planning and Management Program Power Marketing...-2017 remarketing efforts, the Energy Management and Planning Program (Program), and the Conformed... Criteria) published in the Federal Register on December 28, 1984 (49 FR 50582), are available at...

  2. 76 FR 81962 - Final Environmental Impact Statement for General Management Plan, Ross Lake National Recreation...

    Science.gov (United States)

    2011-12-29

    ... NATIONAL PARK SERVICE Final Environmental Impact Statement for General Management Plan, Ross Lake National... Plan for Ross Lake National Recreation Area (Ross Lake NRA) in Washington State. This Final EIS... management of the Ross Lake NRA. SUPPLEMENTARY INFORMATION: The original public information process began...

  3. Planning of Low-rise Urban Housing Areas

    DEFF Research Database (Denmark)

    Svensson, O.

    In many countries industrialization of house building has led to the building of large, monotonous housing areas with high-rise construction. In Denmark, however, smaller, varied housing areas with low-rise construction and urban features have become predominant. This report contains guidelines...... for the planning of such housing areas....

  4. Tourism in local planning and development : tourist area product and market plans (destination plans)

    OpenAIRE

    Ørjansen, Dag

    1998-01-01

    The main point in the project was to try to find a better framework for the tourism business units own destination planning and try to find a better co-operation with the local planning. By local planning we mean both the traditional long-term development planning, economical planning and short-term development planning.

  5. Perspectives of Forest Management Planning: Slovenian and Croatian Experience

    OpenAIRE

    Bončina, Andrej; ČAVLOVIĆ, JURO

    2009-01-01

    Drawing upon the historical framework of origin and development, and a long tradition in forest management planning in Slovenia and Croatia, and based on a survey of literature and research to date, this paper addresses problems and perspectives of forest management planning. Comparison is made of forest management planning concepts, which generally differ from country to country in terms of natural, social and economic circumstances. Impacts of forest management planning on the condition and...

  6. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas

    OpenAIRE

    Hsien-Tsung Chang; Yi-Ming Chang; Meng-Tze Tsai

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intention...

  7. Resource management plan for the Oak Ridge Reservation. Volume 30, Oak Ridge National Environmental Research Park natural areas and reference areas--Oak Ridge Reservation environmentally sensitive sites containing special plants, animals, and communities

    Energy Technology Data Exchange (ETDEWEB)

    Pounds, L.R. [Univ. of Tennessee, Knoxville, TN (US); Parr, P.D.; Ryon, M.G. [Oak Ridge National Lab., TN (United States)

    1993-08-01

    Areas on the Oak Ridge Reservation (ORR) that contain rare plant or animal species or are special habitats are protected through National Environmental Research Park Natural Area (NA) or Reference Area (RA) designations. The US Department of Energy`s Oak Ridge National Environmental Research Park program is responsible for identifying species of vascular plants that are endangered, threatened, or rare and, as much as possible, for conserving those areas in which such species grow. This report includes a listing of Research Park NAs and RAs with general habitat descriptions and a computer-generated map with the areas identified. These are the locations of rare plant or animal species or special habitats that are known at this time. As the Reservation continues to be surveyed, it is expected that additional sites will be designated as Research Park NAs or RAs. This document is a component of a larger effort to identify environmentally sensitive areas on ORR. This report identifies the currently known locations of rare plant species, rare animal species, and special biological communities. Floodplains, wetlands (except those in RAs or NAs), and cultural resources are not included in this report.

  8. 75 FR 55344 - Notice of Intent To Prepare a Resource Management Plan for the Cedar City Field Office, Utah, and...

    Science.gov (United States)

    2010-09-10

    ... Vehicle Area Designations; Special Recreation Management Areas; Wild Horse and Burro management... boundaries for Wild Horse Herd Management Areas will be addressed in the plan. 7. Decisions of the RMP will... Office, Utah, and Associated Environmental Impact Statement AGENCY: Bureau of Land Management,...

  9. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. Before grant assistance can be awarded for any treatment works project, the Regional Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  10. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. (a) From funds reserved under § 35.2020(d) the Regional Administrator shall make grants to the States to carry out water quality management planning including but not limited to:...

  11. 77 FR 44144 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2012-07-27

    ... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning; Correction...) published a National Forest System land management planning rule in the Federal Register, on April 9, 2012..., Subpart A--National Forest System Land Management Planning (36 CFR part 219, subpart A). One...

  12. 49 CFR 236.18 - Software management control plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and...

  13. 300 Area waste acid treatment system closure plan. Revision 1

    International Nuclear Information System (INIS)

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan

  14. On financial management of population and family planning programs.

    Science.gov (United States)

    1976-03-01

    In the 3 day workshop of the Southeast Asian Region on the Financial Management of Population/Family Planning Programs held from March 15 to 17 it was recommended that there by standardization of financial reporting procedures by country programs for population planning. Related to this recommendation was the proposal that measurement of cost benefit and cost effective analysis of country programs be undertaken by the Research and Evaluation Units of the respective population organizations in close coordination with the financial managers. Other major recommendations included: 1) closer coordination between donor agencies and policy making bodies of country programs in the disbursement of funds; 2) more exchange of experiences, ideas, technical knowledge on the financial management of country programs in the Inter G overnmental Coordinating Committee for Southeast Asian countries; and 3) inclusion of applicable financial management topics in the training of clinical staff and followup in actual operation. The priority areas identified for the Inter Governmental Coordinating Committee countries (Nepal, Malaysia, Thailand, Singapore, and the Philippines) are financial planning; generation of resources and budgeting and allocation of funds; accounting and disbursement of funds; financial management at the clinic level; use of and control of foreign aid; and cost effectiveness, benefit analysis and financial reporting. PMID:12334205

  15. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  16. Medical technology management: from planning to application.

    Science.gov (United States)

    David, Y; Jahnke, E

    2005-01-01

    Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations. PMID:17282142

  17. Annual Water Management Plan: Part I: Results of 1989 activities: Part II: Planned activities for 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  18. Integrated Resource Planning for Urban Waste Management

    Directory of Open Access Journals (Sweden)

    Damien Giurco

    2015-01-01

    Full Text Available The waste hierarchy currently dominates waste management planning in Australia. It is effective in helping planners consider options from waste avoidance or “reduction” through to providing infrastructure for landfill or other “disposal”. However, it is inadequate for guiding context-specific decisions regarding sustainable waste management and resource recovery, including the ability for stakeholders to compare a range of options on an equal footing whilst considering their various sustainability impacts and trade-offs. This paper outlines the potential use of Integrated Resource Planning (IRP as a decision-making approach for the urban waste sector, illustrated using an Australian case study. IRP is well established in both the water and energy sectors in Australia and internationally. It has been used in long-term planning enabling decision-makers to consider the potential to reduce resource use through efficiency alongside options for new infrastructure. Its use in the waste sector could address a number of the current limitations experienced by providing a broader context-sensitive, adaptive, and stakeholder focused approach to planning not present in the waste hierarchy and commonly used cost benefit analysis. For both efficiency and new infrastructure options IRP could be useful in assisting governments to make decisions that are consistent with agreed objectives while addressing costs of alternative options and uncertainty regarding their environmental and social impacts. This paper highlights various international waste planning approaches, differences between the sectors where IRP has been used and gives a worked example of how IRP could be applied in the Australian urban waste sector.

  19. Environmental Protection Department Operations and Regulatory Affairs Division Contingency Plan for Site 300 Waste Accumulation Area(s)

    International Nuclear Information System (INIS)

    This Contingency Plan identifies personnel responsibilities, emergency equipment, and required actions necessary to mitigate potential incidents at the Waste Accumulation Area(s) (WAA)(s) located at the Lawrence Livermore National Laboratory (LLNL) Experimental Test Site 300 (Site 300) as shown in Figure 1. This Plan is designed to prepare personnel to minimize hazards to human health and the environment from fires, explosions, or any sudden or nonsudden release of hazardous, radioactive, or mixed waste constituents to the air, ground surface, or water from waste stored in the WAA(s). The LLNL Site 300 currently has one WAA. The location of the WAA is shown in Figure 2 and identified in Table 1. As programmatic needs change, it may become necessary to establish additional WAAs at Site 300. The WAA is a small, regularly monitored storage area where waste can be accumulated and stored temporarily. Hazardous and mixed waste can be stored or accumulated in a WAA for up to 90 days, after which it must be transferred to a Department of Toxic Substances Control (DTSC) authorized onsite treatment or storage facility or an authorized offsite treatment, storage, or disposal facility (TSDF). The onsite TSDFs authorized by DTSC are managed by the Radioactive and Hazardous Waste Management (RHWM) Division and by the Chemistry and Materials Science Directorate (CMS) at Site 300. Hazardous, radioactive, or mixed waste is referred to as ''waste'' in this document. Radioactive waste has been included in this Plan as a ''Best Management Practice'' to aid in response, where appropriate. However, radioactive waste is not regulated by DTSC under this Plan. This Contingency Plan is divided into two parts: (1) The first part, referred to as the ''General Plan'', is general information that is applicable to the existing and any subsequent WAAs. The General Plan includes Sections 1-7 and Appendices A-C. (2) The second part, referred to as the ''Site-Specific Plan'', contains site

  20. Environmental Protection Department Operations and Regulatory Affairs Division Contingency Plan for Site 300 Waste Accumulation Area(s)

    Energy Technology Data Exchange (ETDEWEB)

    Levy, R

    2005-07-14

    This Contingency Plan identifies personnel responsibilities, emergency equipment, and required actions necessary to mitigate potential incidents at the Waste Accumulation Area(s) (WAA)(s) located at the Lawrence Livermore National Laboratory (LLNL) Experimental Test Site 300 (Site 300) as shown in Figure 1. This Plan is designed to prepare personnel to minimize hazards to human health and the environment from fires, explosions, or any sudden or nonsudden release of hazardous, radioactive, or mixed waste constituents to the air, ground surface, or water from waste stored in the WAA(s). The LLNL Site 300 currently has one WAA. The location of the WAA is shown in Figure 2 and identified in Table 1. As programmatic needs change, it may become necessary to establish additional WAAs at Site 300. The WAA is a small, regularly monitored storage area where waste can be accumulated and stored temporarily. Hazardous and mixed waste can be stored or accumulated in a WAA for up to 90 days, after which it must be transferred to a Department of Toxic Substances Control (DTSC) authorized onsite treatment or storage facility or an authorized offsite treatment, storage, or disposal facility (TSDF). The onsite TSDFs authorized by DTSC are managed by the Radioactive and Hazardous Waste Management (RHWM) Division and by the Chemistry and Materials Science Directorate (CMS) at Site 300. Hazardous, radioactive, or mixed waste is referred to as ''waste'' in this document. Radioactive waste has been included in this Plan as a ''Best Management Practice'' to aid in response, where appropriate. However, radioactive waste is not regulated by DTSC under this Plan. This Contingency Plan is divided into two parts: (1) The first part, referred to as the ''General Plan'', is general information that is applicable to the existing and any subsequent WAAs. The General Plan includes Sections 1-7 and Appendices A-C. (2) The second part

  1. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... management planning for Indian forest land shall be carried out through participation in the development...

  2. Terrestrial forest management plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  3. Impounding of tailings at Jaduguda : planning, design and management

    International Nuclear Information System (INIS)

    The tailings are the waste product of the ore processed by the industry which consists of ground up rock that remains after the mineral values have been recovered from the ore. Tailings dam is constructed to impound these tailings for pollution hazards which are very severe for the radioactive wastes associated with the uranium ore processing. The tailings dam is an important structure in view of the structural stability as its failure will release a very large amount of water and semi-fluid tailings which can, not only cause the severe threat to life and property of nearby area but also can cause extensive down stream pollution. The planning, design and management of tailings dam requires careful consideration of many factors to make the system economical as well as safer on long term basis. The paper explains these factors and consideration of same in planning, designing and managing the tailings dam at Jaduguda from inception to the future planning. This also highlights the problem faced in present tailings dam endangering the stability of the dam, corrective action taken and studies conducted to improve the stability of the same in future. It further deals with the planning and design of new proposed dam for future Jaduguda requirement incorporating changes in design based on experience gained in managing the present dam. (author). 1 ref

  4. 76 FR 53481 - Outer Continental Shelf, Alaska OCS Region, Chukchi Sea Planning Area, Oil and Gas Lease Sale 193

    Science.gov (United States)

    2011-08-26

    ..., Chukchi Sea Planning Area, Oil and Gas Lease Sale 193 AGENCY: Bureau of Ocean Energy Management... Continental Shelf (OCS) Oil and Gas Lease Sale 193, Chukchi Sea, Alaska (OCS EIS/EA BOEMRE 2011-041). BOEMRE... Final EIS, Oil and Gas Lease Sale 193, Chukchi Sea Planning Area (OCS EIS/EA MMS 2007-026). BOEMRE...

  5. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    OpenAIRE

    Prandi, F.; Magliocchetti, D.; A. Poveda; R. De Amicis; M. Andreolli; F. Devigili

    2016-01-01

    Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity o...

  6. SPATIAL FOREST HARVEST PLANNING CONSIDERING MAXIMUM OPERATIONAL AREAS

    OpenAIRE

    Andrey Lessa Derci Augustynczik; Julio Eduardo Arce; Arinei Carlos Lindbeck da Silva

    2015-01-01

    One of the biggest challenges that forest managers face in forest planning is related to logistic issues of forest harvesting. The operational planning of forest harvesting must consider simultaneously the economic and environmental concerns, searching for increasing the efficiency and mitigating environmental damage related to the opening of forest cover. The inclusion of spatial aspects in forest harvesting is usually done through adjacency constraints. The main approaches to solve this sor...

  7. Plan of environmental management, Metro (railway)

    International Nuclear Information System (INIS)

    The present article, tries to rescue and to put to the readers' consideration some of the most excellent aspects in the Plan of Environmental management of the Metro - PMAM. This study was carried out by a multidisciplinary group, in its majority professors of the Antioquia university, and summoned by the Center of Environmental Investigations of the Ability of Engineering. It is convenient to remember that in a Plan of Environmental management - PMA settles down the actions that are required to prevent, to mitigate, to control, to compensate and to correct the possible negative environmental impacts and potential the positive ones caused by the execution or operation of a project, it works or activity. A PMA also includes the pursuit plans, evaluation, monitored and contingency, and it is the result of the Study of Environmental Impact - EIA. It is of scoring that the EIA that possesses the METRO, on which it is supposed this PMA would consolidate, one carries out responding to conditions that, 10 years later, they were surpassed by the expectations of the time, and in some cases its considerations don't satisfy the current demands; however neither it is exactly to evaluate now, when there is a perception different from the reality, those conclusions that it tried to predict derived future events of the construction and the operation of the Metropolitan Train in their moment. Therefore, this studies it tries to rescue those recommendations that still have validity and it tries to contribute, starting from an interdisciplinary encounter some recommendations, translated to programs, projects and actions that guide the Management for the taking of decisions in the terminal phase and the Commercial Operation of the METRO, toward the future

  8. Evaluating the effectiveness of management of the Kisite-Mpunguti marine protected area.

    OpenAIRE

    Muthiga, N.

    2009-01-01

    Managers of Marine Protected Areas (MPAs) are faced with many demands and often do not have the opportunity to reflect on the results of their actions. Management evaluations allow managers to learn from successes and improve management through time. This first assessment of the management effectiveness of the Kisite-Mpunguti MPA used existing information to evaluate the actions and outcomes measured against the MPA's goals as outlined in the MPA management plan. Selected biophysical, socio-e...

  9. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  10. The department manager and effective human resource planning: an overview.

    Science.gov (United States)

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed. PMID:17314626

  11. The department manager and effective human resource planning: an overview.

    Science.gov (United States)

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  12. Toward better application of minimum area requirements in conservation planning

    NARCIS (Netherlands)

    Pe’er, G.; Tsianou, M.A.; Franz, K.W.; Matsinos, Y.G.; Mazaris, A.D.; Storch, D.; Kopsova, L.; Verboom, J.; Baguette, M.; Stevens, V.M.; Henle, K.

    2014-01-01

    The Minimum Area Requirements (MAR) of species is a concept that explicitly addresses area and therefore can be highly relevant for conservation planning and policy. This study compiled a comprehensive database of MAR estimates from the literature, covering 216 terrestrial animal species from 80 stu

  13. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  14. Integrated radioactive defense waste management plan

    International Nuclear Information System (INIS)

    The plan for controlling the releases of radioactivity and ensuring the safe storage of radioactive wastes generated by past, present, and future operation of the Savannah River Plant (SRP) is presented. The waste was categorized as solid, liquid, and gaseous, and the different waste management operations are categorized as treatment, storage, and release operations. Following a summary of the environmental effects of SRP emissions, the document includes in succession (1) a description of processes that generate wastes, (2) a description of the various waste treatment techniques, (3) a description of the waste holding facilities, and (4) a description of the plant's waste storage facilities

  15. Marsh and Water Management Plan : Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The marsh and water management plan outlines and describes management strategies for maintenance, rehabilitation, and development of managed waters on the Clarence...

  16. Fur Management Plan: Mark Twain National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  17. Benton Lake National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Benton Lake NWR Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  18. Back Bay National Wildlife Refuge: Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Back Bay National Wildlife Refuge Fur Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the...

  19. Habitat Management Plan - Clarks River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Habitat Management Plans (HMPs) are dynamic working documents that provide refuge managers a decision-making process; guidance for the management of the refuge’s...

  20. Long Term Fur Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  1. Crab Orchard National Wildlife Refuge : Furbearer Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crab Orchard National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  2. Furbearer Management Plan : Rice Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Rice Lake NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  3. Station Management Plan Long Island National Wildlife Refuge Complex 1992

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Station Management Plan provides the Refuge Manager with three to five year guidance for managing eight National Wildlife Refuges located on Long Island, New...

  4. Furbearer Management Plan : Big Stone National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Stone NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  5. MANAGEMENT OF ENVIRONMENTAL RISKS IN COASTAL AREAS

    OpenAIRE

    M. Caprioli; R. Trizzino; R. Pagliarulo; Scarano, M; F. Mazzone; A. Scognamiglio

    2015-01-01

    The present work deals with the assessment and management of environmental risk conditions in a typical costal area of Southern Italy. This area, located in the Salento peninsula, is subject to recurrent widespread instability phenomena due to the presence of steep rocky cliffs. Along the coast there are numerous beach resorts that are very crowded in the summer season. The environmental hazard deriving from the possible rock falls is unacceptably high for the people safety. Moreover, the lan...

  6. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... understands ERP as boundary objects characterised by modularity, abstraction, accommodation, and standardization. An in-depth cross-disciplinary literature review and role synthesis is conducted. Findings – Four enabling and three constraining effects of ERP are deduced from existing literature. ERP and OM...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...

  7. Regulatory methods of effective construction management based on planning of territories

    OpenAIRE

    BRONEVYTSKYI S. P

    2015-01-01

    Purpose. Current state building standard SCN 360-92** «Planning and development of territories of population area» does not perform its primary function of construction management during project construction works, because their development and construction works were carried out during of their development in conditions of administrative-planned system of construction management, implementation of construction works by service of a single customer, the design of residential area of housing c...

  8. 77 FR 1895 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-01-12

    ... action, we are proposing to approve South Coast Air Quality Management District (SCAQMD) Rule 317.... South Coast Air Quality Management District There are two 1-hour ozone nonattainment areas within the... Quality Management Plan, as revised in 1999.\\9\\ The approved 1-hour ozone SIP in the Southeast...

  9. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  10. Sustainable Land Management in Mining Areas in Serbia and Romania

    Directory of Open Access Journals (Sweden)

    Vesna Popović

    2015-08-01

    Full Text Available The paper analyzes the impacts of mining activities on sustainable land management in mining areas in the Republic of Serbia and Romania and discusses the main challenges related to the management of these issues in legislation and practice. Particular attention is paid to land disturbance, mine waste management and land reclamation, as well as access to land for mining purposes, the transfer of mining royalties and the partnerships of the mining industry, governments, communities and civil society for sustainable mining. Both governments are willing to provide the adequate role to mining in strengthening the national economies, but they face numerous constraints in this matter. Sustainable mining practices and consistent implementation of the mining for the closure planning approach, within an improved legislative framework and in cooperation with stakeholders at all levels, create conditions for the development of creative, profitable, environmentally-sound and socially-responsible management and reuse of mine lands.

  11. HotSpot Software Configuration Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Walker, H; Homann, S G

    2009-03-12

    This Software Configuration Management Plan (SCMP) describes the software configuration management procedures used to ensure that the HotSpot dispersion model meets the requirements of its user base, which includes: (1) Users of the PC version of HotSpot for consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. This plan is intended to meet Critical Recommendations 1 and 3 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  12. Local Area Network Management: An Unresolved Issue.

    Science.gov (United States)

    Howden, Norman

    1989-01-01

    Discussion of management issues involved with local area networks (LAN) among information organizations focuses on a project at the University of North Texas that was designed to investigate problems associated with LAN. Topics discussed include purchasing decisions for hardware and software, and integration among various groups of users. (Eight…

  13. Solid Waste Management in Recreational Forest Areas.

    Science.gov (United States)

    Spooner, Charles S.

    The Forest Service, U. S. Department of Agriculture, requested the Bureau of Solid Waste Management to conduct a study of National Forest recreation areas to establish waste generation rates for major recreation activities and to determine the cost of solid waste handling for selected Forest Service Districts. This report describes the 1968 solid…

  14. Habitat changes: Mount Haggin Wildlife Management Area

    Science.gov (United States)

    Frisina, M.R.; Keigley, R.B.

    2004-01-01

    In 1984, a rest-rotation grazing system was established on the Mount Haggin Wildlife Management Area (MHWMA) in southwest Montana. The area is a mixture of wet and dry meadow types, grass/shrublands, and forest. Prior to implementing the grazing system, photo-monitoring points were established on the MHWMA at locations were cattle concentrate were grazing. The area consists of a three pasture rest-rotation system incorporating 20,000 acres. Photo essays revealed changes in riparian, lowland, and upland sites within the grazing system. In addition, gross changes in the amount of willow present were documented.

  15. Forest Resource Management Plans--A Landowner-Oriented Approach.

    Science.gov (United States)

    Straka, Thomas J.

    1993-01-01

    Describes a teaching approach that uses actual landowners and their forest lands to create real world management planning experiences for senior forestry students. Using land currently managed by natural resource professionals allows the instructor to compare student plans with professionally prepared plans. (MDH)

  16. Wildlife Management Plan for the Oak Ridge Reservation

    Energy Technology Data Exchange (ETDEWEB)

    Giffen, Neil R [ORNL; Evans, James W. [TWRA; Parr, Patricia Dreyer [ORNL

    2007-10-01

    This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

  17. 77 FR 21803 - Notice of Intent To Amend the Resource Management Plan for the Rawlins Field Office and...

    Science.gov (United States)

    2012-04-11

    ... planning process: Air quality, cultural resources, fire and fuels management, forest management, lands and... inventory within the planning area. The BLM will use this updated inventory as a baseline to consider... BLM Web site at: http://www.blm.gov/wy/st/en/programs/Planning/rmps/rawlins.html . In order to...

  18. 300 Area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999

  19. 300 Area waste acid treatment system closure plan

    Energy Technology Data Exchange (ETDEWEB)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.

  20. Indicators for management of planned outages in nuclear power plants

    International Nuclear Information System (INIS)

    The outages considered within the scope of this publication are planned refuelling outages (PWR and BWR nuclear power plants) and planned outages associated with major maintenance, tests and inspections (PHWR and LWGR nuclear power plants). The IAEA has published some valuable reports providing guidance and assistance to operating organizations on outage management. This TECDOC outlines main issues to be considered in outage performance monitoring and provides guidance to operating organizations for the development and implementation of outage programmes which could enhance plant safety, reliability and economics. It also complements the series of reports published by the IAEA on outage management and on previous work related to performance indicators developed for monitoring different areas of plant operation, such as safety, production, reliability and economics. This publication is based upon the information presented at a technical meeting to develop a standardized set of outage indicators for outage optimization, which was organised in Vienna, 6-9 October 2003. At this meeting, case studies and good practices relating to performance indicator utilization in the process of planned outage management were presented and discussed

  1. SURFACE WATER QUALITY MANAGEMENT IN PRAHOVA AREA

    Directory of Open Access Journals (Sweden)

    CASEN PANAITESCU

    2014-05-01

    Full Text Available To achieve an appropriate management strategy was monitored surface water quality in the county of Prahova. In this regard were determinate major physical and chemical indicators: pH, BOD5, COD, nitrates, nitrites, and suspended solids. Depending on the value of the data obtained was identified water quality classes corresponding to each surface water body studied. The correlation values obtained with the best solutions for water service and maintenance of water courses is a management plan for surface water in the county of Prahova. The novelty of the paper consists of study of water resources in the county and not in the Basin as is done at present by the Romanian Waters National Administration

  2. Station Management Plan Mason Neck National Wildlife Refuge 1993

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In March 1992, a planning team met to identify issues, set objectives and develop strategies for management of the three refuges. The information from the planning...

  3. Water Management Plan: Savannah National Wildlife Refuge Calendar Year 1962

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Water Management Plan for Savannah NWR for calendar year 1962. This plan includes brief habitat descriptions and specific actions for Pools 2-7A, as well as...

  4. Annual Water Management Plan Wheeler National Wildlife Refuge 1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  5. Annual Water Management Plan Wheeler National Wildlife Refuge 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  6. Mark Twain National Wildlife Refuge : Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  7. Annual Water Management Plan White River National Wildlife Refuge 1989

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  8. Water Management Plan 1950 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this...

  9. Water Management Plan 1949 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this...

  10. Water Management Plan : Clarence Cannon National Wildlife Refuge [1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  11. Water Management Plan: Bombay Hook National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this...

  12. Annual Water Management Plan Wheeler National Wildlife Refuge 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  13. Annual Water Management Plan White River National Wildlife Refuge 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  14. Water Management Plan : Clarence Cannon National Wildlife Refuge [1987

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Clarence Cannon National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  15. Annual Water Management Plan Wheeler National Wildlife Refuge 1998

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  16. Annual Water Management Plan White River National Wildlife Refuge 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a...

  17. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  18. Fishery management plan: Morgan Brake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines goals and objectives recommended by the Service Fisheries Assistance program. The plan is to be used as a guide in managing the Refuge's fishery...

  19. Wildland Fire Management Plan: Great River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document establishes a Fire Management Plan (FMP) for the Great River National Wildlife Refuge and for purposes of this plan includes Clarence Cannon National...

  20. Umatilla National Wildlife Refuge: Comprehensive Conservation Plan Management Direction

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Umatilla NWR for the next 15 years. This plan outlines the Refuge vision and purpose...